ML100890378: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 03/22/2010 | | issue date = 03/22/2010 | ||
| title = Independent Spent Fuel Storage Installation, Summary of Evaluation Affecting the Facility Changes, Tests and Experiments | | title = Independent Spent Fuel Storage Installation, Summary of Evaluation Affecting the Facility Changes, Tests and Experiments | ||
| author name = Lane N | | author name = Lane N | ||
| author affiliation = Virginia Electric & Power Co (VEPCO) | | author affiliation = Virginia Electric & Power Co (VEPCO) | ||
| addressee name = | | addressee name = | ||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 22, 2010 Attention: | {{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 22, 2010 Attention: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards United States Nuclear Regulatory Commission Washington, D. C. 20555-0001 Serial No. | ||
Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards United States Nuclear Regulatory Commission Washington, D. C. 20555-0001 Serial No.NAPS/JHL Docket Nos.License No.10-176 72-16 72-56 SNM-2507 Gentlemen: | NAPS/JHL Docket Nos. | ||
License No. | |||
10-176 72-16 72-56 SNM-2507 Gentlemen: | |||
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION) | VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION) | ||
NORTH ANNA POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) | NORTH ANNA POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) | ||
==SUMMARY== | ==SUMMARY== | ||
OF FACILITY CHANGES, TESTS AND EXPERIMENTS Pursuant to 10 CFR 72.48(d)(2), a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each, must be submitted to the NRC -Office of Nuclear Material Safety and Safeguards, at intervals not to exceed 24 months. This letter is to notify you that there were no evaluations affecting the North Anna Power Station ISFSI facility during 2009.If you have any questions, please contact Page Kemp at (540) 894-2295.Very trul yours, N. Larry*:D Site Vice Presider cc: U. S. Nuclear Regulatory Commission Attention: | OF FACILITY CHANGES, TESTS AND EXPERIMENTS Pursuant to 10 CFR 72.48(d)(2), a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each, must be submitted to the NRC - Office of Nuclear Material Safety and Safeguards, at intervals not to exceed 24 months. This letter is to notify you that there were no evaluations affecting the North Anna Power Station ISFSI facility during 2009. | ||
Document Control Desk Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 NRC Senior Resident Inspector North Anna Power Station 0 ý ý'-) D I}} | If you have any questions, please contact Page Kemp at (540) 894-2295. | ||
Very trul yours, N. Larry*:D Site Vice Presider cc: | |||
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 NRC Senior Resident Inspector North Anna Power Station 0 ý ý'-) D I}} | |||
Latest revision as of 05:50, 14 January 2025
| ML100890378 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 03/22/2010 |
| From: | Lane N Virginia Electric & Power Co (VEPCO) |
| To: | NRC/NMSS/SFPO |
| References | |
| 10-176 | |
| Download: ML100890378 (1) | |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 22, 2010 Attention: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards United States Nuclear Regulatory Commission Washington, D. C. 20555-0001 Serial No.
NAPS/JHL Docket Nos.
License No.10-176 72-16 72-56 SNM-2507 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
SUMMARY
OF FACILITY CHANGES, TESTS AND EXPERIMENTS Pursuant to 10 CFR 72.48(d)(2), a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each, must be submitted to the NRC - Office of Nuclear Material Safety and Safeguards, at intervals not to exceed 24 months. This letter is to notify you that there were no evaluations affecting the North Anna Power Station ISFSI facility during 2009.
If you have any questions, please contact Page Kemp at (540) 894-2295.
Very trul yours, N. Larry*:D Site Vice Presider cc:
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 NRC Senior Resident Inspector North Anna Power Station 0 ý ý'-) D I