ML101620490: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML101620490
| number = ML101620490
| issue date = 06/16/2010
| issue date = 06/16/2010
| title = 06/16/2010-Notice of Construction Reactor Oversight Process Category 2 Public Meeting Handout: Wolf Creek 2, Notice of Violation and Proposed Imposition of Civil Penalty, Dated 11/21/1984
| title = Notice of Construction Reactor Oversight Process Category 2 Public Meeting Handout: Wolf Creek 2, Notice of Violation and Proposed Imposition of Civil Penalty, Dated 11/21/1984
| author name = Mattern K
| author name = Mattern K
| author affiliation = NRC/NRO/DCIP/CAEB
| author affiliation = NRC/NRO/DCIP/CAEB
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:m*iitigated by 25%. An Order for $130,000 was issued on January 16, 1985'and the licensee paid the civil penalties on January 31, 1985.
{{#Wiki_filter:m*iitigated by 25%.
Connecticut Yankee Atomic Power Company, Hartford, Connecticut (Haddam Neck Plant) EA 84-115, Supplement I An Order Modifying License and Notice of Violation and Proposed, Imposition of Civil Penalty in the--amount-df :$80,OO -was fssued'on December 13, 1984 based on. the failure of the reactor .refuel ing cavity.seal and                                                                           ohe'resultatdrainihjof the reactor coolant waterýnr the-cavity torthe containmenit floor. An Order wasjssued to ensure improvements in the design change modification program.
An Order for $130,000 was issued on January 16, 1985'and the licensee paid the civil penalties on January 31, 1985.
      . .Theliicensee responded and paid the civil ,penalty ,opnJanuary 28, Kansas' as -and ectri Company, 'W-ichita, Kansas
Connecticut Yankee Atomic Power Company, Hartford, Connecticut (Haddam Neck Plant) EA 84-115, Supplement I An Order Modifying License and Notice of Violation and Proposed, Imposition of Civil Penalty in the--amount-df :$80,OO -was fssued'on December 13, 1984 based on. the failure of the reactor.refuel ing cavity.seal and ohe'resultatdrainihjof the reactor coolant waterýnr the-cavity torthe containmenit floor.
    .(WolCMV-e4Gnerat                   "a-84-107, g Station)e                                        Supplement II aImh-vil ndPrN6tio*ofdVialoh                                                      Penalty in m ount...o.,he%      f $715,9000"                 issuedon Nv ber %                            ?1, 1 84 ed on a
An Order wasjssued to ensure improvements in the design change modification program.
* nif~catrtie
..Theliicensee responded and paid the civil,penalty,opnJanuary 28, Kansas' as -and ectri Company, 'W-ichita, Kansas
                      ... i,,iff"'
.(WolCMV-e4Gnerat g Station)e "a-84-107, Supplement II ndPrN6tio*ofdVialoh aImh-vil Penalty in o.,he%
a,n ,ovih t, , ')            ,. . . -:t . I. 1censee
m ount... f $715,9000" issuedon Nv ber ?1, 1 84 ed on a nif~catrtie "sprogram for the
::;., "
*... iff"'
                                                                                                  "sprogram for the fnspection
i a, n t,  
_
,ovih
                        .. I11'I           l I   i     .              I      Ib       I   I   ,          LI   L.LU   aI      )           I   e S       J,.R,n ~ *lesee            UI T* n "'* resnpoedbd
-:t 1censee fnspection
                      ,cem*,
')
IUI De em er
I.
                                                                                                      %,VI and 3; 1984, .and1nkluded
I11'I l
                                                                                                  ý.i, survpaymentollanc NeCsk                         etest Vl oe              nit b a tter naeysT,*ea                                               lesiense ponse.
I i
ic~lI
Ib I
            .IýlA       ll)i ;p "y-- i~T ~                                                                             ofICvl            Pnaty i
I LI L.LU I
                                                                ":
%,VI I
                                                                -ki*     . 4-*: iT           "   't     *  !  '    ..  .      ,    i;     :
)
anpdr-pu~1*Uaid"    f.~4
UI IUI I
                                      'tth. ;ý - :.ll,:EnA
a S
                                                        --
n *lesee resnpoedbd em De and 3; 1984,.and1nkluded J,.R, T*  
t on x1a2 ch ..14,l 18em.                                    .. *..        ....
~
andhpaiddtheacivieeria*Ttompeorm                                      1n85.
n "'*  
Ne~as urveilac etests ft                                          b                    es.        T Pennsylvania Power an&dLighttýCompany,. Allentown, .Pennsylvania..
,cem*,
(Si           ýnjta                       E ettric' Stati~on,ý_ Unit2                                                         Supplemet
er  
:A419 I
ý.i, NeCsk Vl naeysT,*ea ponse.
        *.
ic~lI  
SA         tiN*t 'ofV1i0o*tion,and                         Prosed                   ipostonof                       viPnaty in the event  't0amount;0of that i n .5W0O,    iVe1d:''d Won  was-c       issue0 0§,-;*
.IýlA ll) i ;p "y-i~T ~
l"e***:,        *'0..' Decemer
ofI Cvl Pnaty i survpaymentollanc e test oe nit b a tter lesiense andhpaiddtheacivieeria*Ttompeorm 1n85.
:,, 1 i.;**   f 18, - 1984 r based on an
Ne~as urveilac etests ft b
                                                                                                              ,,*:
es.
complete loss of all low-pressure emergency core cooling systems for.approximately43minutes., The licensee responded.and,                           trie                   nlto _J anda ýy1                                     195 Tennessee Valley.,Aut~hority,                               Chattanooga, Tennessee.
T 1*U "
(roWn~s. Fe~r~y.Nucl~ear Pan'                   1,i'~f     U,                  2, an 3),                         84-OSpen                         I
f.~4
            .... Noieof'*ce             o lation and .ropo6eod'£IimipoStidn or Civi Penalties in etham         d.         .$10'0               '*. isasu*u.6fd 6w:aeary28"!i985jbased on three viol at ions which gel ated' to a. .core.,spray overpressurization event othe rv~latfons'which 'collectiv pand                                                                                                71 iV~at                 J'r 6Fon       w ivei'                                        r~~sn~i                     equate impemenyq.6 O ne_ lcensees quaity                                                                         ce program ensee' 'responded and'paidte civiI p                                                             -enalty on February 27,             1985.
;ý
-ki*
4-*: iT  
" 't i;
anpdr  
-pu~ aid
'tth.
:.ll,:EnA t on x1a2 ch..14,l 18em.
e Pennsylvania Power an&dLighttýCompany,. Allentown,.Pennsylvania..
(Si  
ýnjta E ettric' Stati~on,ý_ Unit2
:A419 Supplemet I SA tiN*t 'ofV1i0o*tion  
,and Prosed ipostonof viPnaty in the 't0amount;0of  
.5W0O, was-issue0 Won Decemer 18, 1984 based on an event that i n iVe1d:' 'd c l"e***:, 0§,-;*  
*'0..'
:,, 1,,*: -
i.;**
f r
complete loss of all low-pressure emergency core cooling systems for.approximately43minutes.,
The licensee responded.and, trie nlto _J a nda ýy1 195 Tennessee Valley.,Aut~hority, Chattanooga, Tennessee.
(roWn~s. Fe~r~y.Nucl~ear Pan' 1,i'~f 2, an 3),
U, 84-OSpen I
.... Noieof'*ce o
lation and.ropo6eod'£IimipoStidn or Civi Penalties in etham
: d.  
.$10'0 isasu*u.6fd 6w:aeary28"!i985jbased on three viol at ions which gel ated' to a..core.,spray overpressurization event pand othe rv~latfons'which 'collectiv 71 iV~at J'r 6Fon w ivei r~~sn~i equate impemenyq.6 O ne_ lcensees quaity ce program ensee' 'responded and'paidte civiI p  
-enalty on February 27, 1985.
4 L
4 L
                                                                            *    -    ~~-.t***. '>**~     -~ *<..
~~-.t***.  
'>**~  
-~ *<..


I
I
                ~9 A                                                 UNITED STATES
~9 A UNITED STATES NUCLEAR REGULATORY COMMISSION Il"...L.J REGION IV
                  *  ""-'*'                    NUCLEAR REGULATORY COMMISSION Il"...L.J                                   REGION IV
,I*'IWI':*I 611 RYAN PLAZA DRIVE. SUITE 1000 ARUNGTON. TEXAS 76011 Docket:
            ,I*'IWI':*I       -                            611 RYAN PLAZA DRIVE. SUITE 1000 ARUNGTON. TEXAS 76011 Docket:         STN 50-482/84-22 EA 84-;O7.107 NOV `2j Kansas Gas 'and Electricd Company'-
STN 50-482/84-22 EA 84-;O7.107 NOV `2j Kansas Gas 'and Electricd Company'-
ATTN:,,-Glenn L. Koester'.
ATTN:,,-Glenn L. Koester'.
            -Vice' Pre'sd nt                     -   Ncleair&#xfd; Wichita, Kansas ',67201;'
-Vice' Pre'sd nt -
Ncleair&#xfd; Wichita, Kansas ',67201;'
Gentlemen:
Gentlemen:


==SUBJECT:==
==SUBJECT:==
. -NO-TCE OF VIOLATION AND PROPOSED IMPOSITION 4OF CIVIL PENALTY
. -NO-TCE OF VIOLATION AND PROPOSED IMPOSITION 4OF CIVIL PENALTY
  ,This refers .totheinspectionconducted.byMr,, R. G. Ta lorand other Region IV personne dujrin       i              the periOd     &#xfd; Ju'ne tructnnon          11, through- September 28,
,This refers.totheinspectionconducted.
                                                                  . 'z,:,&#xfd;I                             Wol.11984.of activities
byMr,, R. G. Ta lorand other Region IV personne i dujrin the periOd Ju'ne 11, through-September 28, 1984.of activities tructnnon
                                                                                                        --.
&#xfd;
authori zed by NRC. Construction, e',t CPPR-1' for t'&#xfd;he Wolf Creek.Generating Station. ? ne,,eu Its of the - nspecti~on 'weredic~sejwt                                     &sect;;!.F.Dud and 9oher "Mmes Of. your sta*ff at 6 econc"usionof! the.inspection andfiduring an EnAforl`emnt' Coex                       ren         hl.u       -October- -29,1498C.           t.. N `..Rexgon'.V ff ice in                                       with`ybui                         rTe              omemersof the ,Kainsas       as d staff                                     1n.mte.'*ana.e.so o tnV,                                               D Two violations.,were Identiftied durig--thiis inspection.",.They are described in the encloseOd,1Noti'ce of Violatln'aind'Proposed-Imhposition of Civil Penalty.
'z,:,&#xfd;I  
ViolIation* 1"re ,rpresents a"significat brea kdowni n' y,                                             program for the inspection -and correction of defective safety-related structural steel welds.
--.Wol.1 authori zed by NRC. Construction e',t CPPR-1' for t'&#xfd;he Wolf Creek.Generating Station. ? ne,,eu Its of the - nspecti~on 'were dic~sejwt  
To emphasize --te n'eed for'KanasGasand ElectrW company managemne'ntto"ensure an effe:t~ye,,qd~al:ty a                                                     .ha s bi nimplemented
&sect;;!.F.Dud and 9oher "Mmes Of your sta*ff at econc"usionof! the.inspection 6
                                                                                              ,,ih1Oitsur       -tanh**sln*ogr'aii that 4 th:ldenti K            fies and corrects construct'i'on deficiencieSi, I*h-a-ve bee-uh-ath6r;-ized, afati&#xfd;e:-
andfiduring an EnAforl`emnt' Coex ren hl.u  
consuli"-"tatib'n.
-October- -29, 1498C.
e " :,th &#xfd;wi th       1"?'the
t..
                                          .... Deputy Not             . rector,-
N `..Rexgon'.V ff i ce in rTe with`ybui omemersof the,Kainsas as d staff 1n.mte.'*ana.e.so o tnV, D
T;:*sceco Di  T-- O* t-" Office
Two violations.,were Identiftied durig- -thiis inspection.",.They are described in the encloseOd,1Noti'ce of Violatln'aind'Proposed-Imhposition of Civil Penalty.
                                                                                  . r"       of. Inspecti
ViolI at ion* 1"re, rpresents a " significat brea kdowni n' y, program for the inspection -and correction of defective safety-related structural steel welds.
                                                                                                    *
To emphasize --te n'eed for'KanasGasand ElectrW company managemne'ntto"ensure an effe:t~ye,,qd~al:ty a  
* I.M,'on and: Enforcement, o...
,,ih1Oitsur  
I   Civi..l".'.
-tanh**sln*ogr'aii  
to issue theenclosed.'Notice>of-Vio~ation, and Proposed Imposition of Civil Penalty in; the amount oftSenventy. five Thousand Dolars, ($75,000) for this viol ati on.-,q,,lThe-.viol atl on, has*cbeen*,categorized as&#xfd;,-a. *Severifty., Level IfIIviovloation in accordance with the NRC Enforcement                                               iPolcy, 10 CFR Part 2, Appendix C, 49 FR 8583 (March" 81,                       '1984)."1The"base civil penalty for a Severity. Level III violation is $50,000. Hwevier, 7inc y6ou fai led ib tCake adequate corrective actions for the po'blhems Jide`n'tifi'fd 'by Corrective Action Requests CAR No. I-W-0029 (initiated on March 22,, 1983) and CAR No. 1-W-0031 (issued Au~ust 16-,1983)," the*as, civil* penalty is being escalated by 50%.
.ha s bi nimplemented that4 K
Violation II has beeh categoriied as* a'Severity Level IV violation for which no civil penalty- is proposed.'
th:ldenti fies and corrects construct'i'on deficiencieSi, I*h-a-ve bee-uh-ath6r;-ized, afati&#xfd;e:-
You are required to.respond to the enclosed Notice of Violation and Proposed Imposition of Civil Penalty. In preparing your response you should follow the instructions, specified' in the.,Notice.- Your reply-to this letter and the results of future inspections will be, considered in determining whether further enforcement action is warranted.
consul tatib'n. &#xfd;wi th the Deputy Di rector,- Office of. Inspecti on and: Enforcement, i "-"
CERTIFIED MAIL RETURNRCIT                       REQUESTED I. A-144
e
:,th 1"?'....
Not sceco T;:*
T-- O*
t-"
r" I. M, o...
I Civi..l". '.
to issue theenclosed.'Notice>of-Vio~ation, and Proposed Imposition of Civil Penalty in; the amount oft Senventy. five Thousand Dolars, ($75,000) for this viol ati on.-,q,,lThe-.viol atl on, has*cbeen*,categorized as&#xfd;,-a. *Severifty., Level IfIIviovloation in accordance with the NRC Enforcement
: iPolcy, 10 CFR Part 2, Appendix C, 49 FR 8583 (March" 81,  
'1984)."1The"base civil penalty for a Severity. Level III violation is $50,000.
: Hwevier, 7inc y6ou fai led ib tCake adequate corrective actions for the po'blhems Jide`n'tifi'fd 'by Corrective Action Requests CAR No.
I-W-0029 (initiated on March 22,, 1983) and CAR No. 1-W-0031 (issued Au~ust 16-,1983)," the*as, civil* penalty is being escalated by 50%.
Violation II has beeh categoriied as* a'Severity Level IV violation for which no civil penalty-is proposed.'
You are required to.respond to the enclosed Notice of Violation and Proposed Imposition of Civil Penalty.
In preparing your response you should follow the instructions, specified' in the.,Notice.- Your reply-to this letter and the results of future inspections will be, considered in determining whether further enforcement action is warranted.
CERTIFIED MAIL RETURNRCIT REQUESTED I. A-144


Kansas Gas and Electric Company           2 In accordance with 10 CFR 2.790, of the NRC's "Rules of Practice," Part 2, Titl.e, 10, Code of Federal. Regulations, a copy of this letter and the enclosures xwill. be placed, in the: NRC"s Publice, Document. Room. .            "        ,
Kansas Gas and Electric Company 2
The responses directed by -this letter and the enclosed Notice are notisubject to the clearance procedure of the Office of Management and Budget as.,required by the Paperwork Reduction Act: of:1980, PL 96-5-1,.,:
In accordance with 10 CFR 2.790, of the NRC's "Rules of Practice," Part 2, Titl.e, 10, Code of Federal. Regulations, a copy of this letter and the enclosures xwill. be placed, in the: NRC"s Publice, Document. Room.
                                            -Sincerely.,
The responses directed by -this letter and the enclosed Notice are not isubject to the clearance procedure of the Office of Management and Budget as.,required by the Paperwork Reduction Act: of:1980, PL 96-5-1,.,:
Original Signe- ry
-Sincerely.,
                                                        ... Si l;:
Original Signe-ry i
Robert D. Martin, -Regional Admini strator Region ,.IV . &#xfd; ,. "* . , %  t , &#xfd; '
S l;:
- .
Robert Region D.
,.IV Martin, -Regional
&#xfd;,.
t  
, &#xfd; '
Admini strator


==Enclosure:==
==Enclosure:==
Notice of Violation and Proposed Imposition of Civil Penalty cc:* - w/enclosure Kansas Gas and:Electric Company
Notice of Violation and Proposed Imposition of Civil Penalty cc:* - w/enclosure Kansas Gas and:Electric Company
  -ATTN:   Gene. -.P,-.-&#xfd;,Rathbun,*Manager of Licensing
-ATTN:
-"P.O.. Box 208 Wicchita, Kansas-,- 67201-.;.                                                   A Forrest Rhodes, Plant Superintendent Wolf, C.reek, Generati*ng, Station..
Gene. -.P,-.-&#xfd;,Rathbun,*Manager of Licensing
P.O. Box 309                 -
-"P.O.. Box 208 Wicchita, Kansas-,- 67201-.;.
Burlington, Kansas 66839 I.A-145
Forrest Rhodes, Plant Superintendent Wolf, C.reek, Generati*ng, Station..
P.O. Box 309 Burlington, Kansas 66839 A
I.A-145


NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTY Kansas Gas and Electric Company                                             Docket:   50-482/84-22 Wolf Creek Generating Station                                              Permit:    CPPR-147 EA 84-107 As -a! -resudlit&#xfd; of, an' NRC .inspection conducted during, the period, 6f June, 11,. 1984i ':
NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTY Kansas Gas and Electric Company Wolf Creek Generating Station Docket:
through September-28,&#xfd; 1984, two viol'ations; were idehtif ied one' of&#xfd; whichK repre's4 a significant breakdown in the licensee's program for the inspection and corre4 of defelctiive -safety-.related-structurali steel welds.;*- To emphasi-zei the, need- for, Kansas Gas&#xfd;an&d,.Elec'triic&#xfd;.'Company:" management, tbo *ensturei an-'effective* qual~ity* r!;{a inspection plrogram-.has. been implement id that .,both idehtifies and .corrects-construction defic4-enc-ies, the Nuclear Regulatory Commission proposes to imposi a civil.penalty in the amount of Seventyy-'five Thousand Dollars ($75,000),for*
Permit:
EA 84-107 50-482/84-22 CPPR-147 As -a! -resudlit&#xfd; of, an' NRC.inspection conducted during, the period, 6f June, 11,. 1984i ':
through September-28,&#xfd; 1984, two viol'ations; were idehtif ied one' of&#xfd; whichK repre's4 a significant breakdown in the licensee's program for the inspection and corre4 of defelctiive -safety-.related-structurali steel welds.;*- To emphasi-zei the, need-for, Kansas Gas &#xfd;an&d,.Elec'triic&#xfd;.'Company:" management, tbo *ensturei an-'effective* qual~ity* r!;{a inspection plrogram-.has. been implement id that.,both idehtifies and.corrects-construction defic4-enc-ies, the Nuclear Regulatory Commission proposes to imposi a civil.penalty in the amount of Seventyy-'five Thousand Dollars ($75,000),for*
this violation..
this violation..
In. accordance with the NRC..Enforcement Policy, 10 CFR Part 2, Appendix C, as revised, 49 FR 8583 (March 8, 1984), and pursuant to Section 234 of the Atomic Energy Ac'ot ;as*.amended.(,Act.I),,.42*US:.C.* 2282, PL 96-295 and 10 CFR 2.205, the particular violations ahd eth'eyassociated civil penalty is set forth in Section I below:
In. accordance with the NRC..Enforcement Policy, 10 CFR Part 2, Appendix C, as revised, 49 FR 8583 (March 8, 1984), and pursuant to Section 234 of the Atomic Energy Ac'ot ;as*.amended.(,Act.I),,.42*US:.C.*
.I. Civil Penal~ty--Viol.ation                                                                         J Criterion Xf,   of"-10 CFR Part 50, Appendix B, requires that a program for inspection of activities 'affecting qualityl be established and&eXecuted, by;:
2282, PL 96-295 and 10 CFR 2.205, the particular violations ahd eth'eyassociated civil penalty is set forth in Section I below:
o     or the organization performing the acti.vito-                       Veri*fy, conformance 1wi~th -
.I.
the6 do"c""mnented ihst~ruc tion'sp'       rocdurs ad                           or -acconiplishinhg-AT Td~wig the IactiVity.                                                                           J Crit6eion XVI of Appendix.B furtherfrequires that measures.be,,establishedd.
Civil Penal~ty--Viol.ation J
to assure .*that nonconforimances' are IpromptlIy identified' and..correc&#xfd;cted.
Criterion Xf, of" -10 CFR Part 50, Appendix B, requires that a program for inspection of activities 'affecting qualityl be established and&eXecuted, by;:
Criterion, XVII requires* that sufficient- records.be: maintained.- to6- furni'sh6 evidence of. activities affecting.quality. -
o or the organization performing the acti.vito-Veri*fy, conformance 1wi~th -
the6 do"c" "m nented ihst~ruc tion'sp' rocdurs ad Td~wig or -acconiplishinhg-AT the IactiVity.
J Crit6eion XVI of Appendix.B furtherfrequires that measures.be,,established d.
to assure.*that nonconforimances' are IpromptlIy identified' and..correc&#xfd;cted.
Criterion, XVII requires* that sufficient-records.be: maintained.- to6-furni'sh6 evidence of. activities affecting.quality.
Daniel International, Corporation (DIC) Construction Procedure No.
Daniel International, Corporation (DIC) Construction Procedure No.
QCP-VII-200 describes the -requirements for performance and inspection of safety-related structural steel welds with-respect to committed conformance to. the Amernican Welding Society (AWS), D1.1.--75.' Appendix I in Revision 4-f       this 0procedure: inhVkes a prohibition with respect to lack of fUsion,overla'p, slag, arc strikes, andweOld splatter. &#xfd; Paragraph 6.5.1 of AWS .l~-75requires ihiector..ver'ificat~ion 'thatthe size and length *of welds conform to the drawing requirements and that no specified welds are om itte d.
QCP-VII-200 describes the -requirements for performance and inspection of safety-related structural steel welds with-respect to committed conformance to. the Amernican Welding Society (AWS), D1.1.--75.'
Appendix I in Revision 4-f this 0procedure: inhVkes a prohibition with respect to lack of fUsion,overla'p, slag, arc strikes, andweOld splatter. &#xfd; Paragraph 6.5.1 of AWS.l~-75requires ihiector..ver'ificat~ion 'thatthe size and length *of welds conform to the drawing requirements and that no specified welds are om itte d.
Contrary to the above, the inspection program for safety-related'structural steel welds was not adequately executed to assure conformance to the
Contrary to the above, the inspection program for safety-related'structural steel welds was not adequately executed to assure conformance to the
      ,requirements of Construction Procedure QCP-VII-200 Revision 4 and the AWS D1.1-75 Code nor. were adequate, records kept to document the quality of the welds... Furthermore, once deficient welds -wer'e identif ied,. no actions, were taken to correct the deficiencies.                         This inadequate inspection program and the failure to take corrective actions is evidenced by the following:
,requirements of Construction Procedure QCP-VII-200 Revision 4 and the AWS D1.1-75 Code nor. were adequate, records kept to document the quality of the welds... Furthermore, once deficient welds -wer'e identif ied,. no actions, were taken to correct the deficiencies.
This inadequate inspection program and the failure to take corrective actions is evidenced by the following:
I. A-146
I. A-146


Notice of Violation                               2
Notice of Violation 2
: 1. 'A random reinspection of 241 structural" steel safety-relateAdwelds, which were made-in accordance with Revision 4 of QCP-VII-200,' was performed by DIC and' documented in Correct~ive Action Repbrt' (CAR)
: 1. 'A random reinspection of 241 structural" steel safety-relateAdwelds, which were made-in accordance with Revision 4 of QCP-VII-200,' was performed by DIC and' documented in Correct~ive Action Repbrt' (CAR)
No.-I.-W-0029, dated March- 22 ,A1983.           SixtytWo -percent o the inspected welds were found by the DICI i nspectors. tonot con'fbrm to the requirements of Revision-4 of QCP-VII-200.                         The reported defects that resulted in rejection-by the DIC inspectors included arc strikes, slag,` ack "of fusion, overlap and weld splatter.
No.-I.-W-0029, dated March-22,A1983.
: 2. Another reinspection of a sample of structural-members-:with the lowest- design safety margins Wast innitiated' on September.' 14.iY.'4984.
SixtytWo -percent o the inspected welds were found by the DICI i nspectors. tonot con'fbrm to the requirements of Revision-4 of QCP-VII-200.
The results of the licensee reinspection activities (verified by NRC inspectbrs) .;as, tof Septembeir-_`28-, 1984, :were as' foll6ws::,-"' ,
The reported defects that resulted in rejection-by the DIC inspectors included arc strikes, slag,`
: a.     A missing weld was found at the same location in each of six pressurizer supportc&#xfd;;,onnections.In&#xfd;               addition,'ifive*of       14 fillet welds in one pressurizer support connection were unders i zed. by- 1/8-incrh to 1/4-i nch with respect to the' drawing-required- size-, of 5/8-inch,' and 'two of ihese'* *wels were*alsob. under' .thez required,, ength; i.e., 3-inh and ,-
ack "of fusion, overlap and weld splatter.
5-inch lengths:,' respectivelyi, versust4adrawi ng-=reiquired'"
: 2.
length of 8 inches.         The weld dimensions of the remaining five" pressurizer support, connectiOns we're not included in' the NRC veri fi cation &#xfd;acti vity.
Another reinspection of a sample of structural-members-:with the lowest-design safety margins Wast in nitiated' on September.' 14.iY.'4984.
Sb.   .Reinspectionf hinine. strctural steel onnections', inthe
The results of the licensee reinspection activities (verified by NRC inspectbrs).;as, tof Septembeir-_`28-, 1984, :were as' foll6ws::,-"',
:",aux-iliary` bufilding ident1i40       two         rmiSs
: a.
                                                                          ,inwelds1   ih3bn,.
A missing weld was found at the same location in each of six pressurizer supportc&#xfd;;,onnections.In&#xfd; addition,'ifive*of 14 fillet welds in one pressurizer support connection were unders i zed. by-1/8-incrh to 1/4-i nch with respect to the' drawing-required-size-, of 5/8-inch,' and 'two of ihese'* *wels were*alsob. under'.thez required,, ength; i.e., 3-inh and,-
connectilon     ~I n"-add iti on,,*wld     zsieo-a-d "lnth-d-Icipnis were identified' ineach of,?the niiecbnne*'tionh;':                 *Ofih     total of 106 welds* in the connections,, eight were found to be uihdersi~zed: lby./6 i hc'       &#xfd;"j1&#xfd;-     ~hwtP-drawing-required width'.- 'Two of the. unders*ized iwelds Werealso under 'the:::requiredIenhth;,i.e         '22**__4 1Y4     chahd 2:1/2-ifch lerfgths,-_`.respect-ively,           a-&#xfd;drawing' requiredength   dIVersus of 3
5-inch lengths:,' respectivelyi, versus t4adrawi ng-=reiquired'"
              - inches.','"An.addiTti-ona- r-ni ne-wel dswere also-underthe drawing-requi               W -length.of 3 inhchs' by1,2Z'ihct-1-irch.
length of 8 inches.
Examination of 54 weld returns-in the nine connhetions found 26 to be undersized by 1/16-inch to.3/16-inch with'.respect to drawing'requi red wdths.kOneof the&#xfd;und'r*id                         ield 'returns was
The weld dimensions of the remaining five" pressurizer support, connectiOns we're not included in' the NRC veri fi cation &#xfd;acti vity.
                -a'lso"Uridert th'ere&#xfd;quir'edlength; -,-i,--e,,&#xfd;&#xfd;*2 inchsveus-a drawi ng-
Sb.  
                -required7 size of 3 inchesI*           n addition, 36`wel*d rturns*exceeded the'drawing-required maximum length of 5/8-inch by 1 5/8 inches
.Reinspectionf hi nine. strctural steel onnections', inthe
                  *'to0:3: 5/8 inches*.* An -additional-eight:weldeturn*,-                     eded the drawiAng- requi red: maxi mumi4 lhength of 3/4-inch by:1/2-'lto                 2 1/8 inches.
:",aux-iliary` bufilding ident1i40 two rmiSs  
: 3. The absence of required MiscellaneOus-;StructuralSteel :Weld Records (MSSWRs) for documenting welding and inspection of safety-related structural, steel weldied conhnections-was itidenttified byKG&E in CAR No.
,inwelds1 ih3bn,.
1-C-0031.         As-a result Of this identification, it has- been established that approximately 16 percent of MSSWRs could not be located, which precludest positi ve-verification of ;control of welding an&&#xfd;peformance       n I. A-147
connectilon  
~I n"-add iti on,, *wld zsieo-a-d "lnth-d-Icipnis were identified' ineach of,?the niiecbnne*'tionh;':  
*Ofih total of 106 welds* in the connections,, eight were found to be uihdersi~zed: lby./6 i hc'  
&#xfd;"j1&#xfd;- ~hwtP-drawing-required width'.- 'Two of the. unders*ized iwelds Werealso under 'the:::req uiredIenhth;,i.e  
'2 2**__4 1Y4 chahd 2:1/2-ifch lerfgths,-_`.respect-ively, dIVersus a-&#xfd;drawing' requiredength of 3
- inches.','"An.addiTti-ona-r-ni ne-wel dswere also-underthe drawing-requi W -length.of 3 inhchs' by1,2Z'ihct-1-irch.
Examination of 54 weld returns-in the nine connhetions found 26 to be undersized by 1/16-inch to.3/16-inch with'.respect to drawing'requi red wdths.kOneof the&#xfd;und'r*id ield 'returns was
-a'lso"Uridert th'ere&#xfd;quir'edlength; -,-i,--e,,&#xfd;&#xfd;*2 inchsveus-a drawi ng-
-required7 size of 3 inchesI*
n addition, 36`wel*d rturns* exceeded the'drawing-required maximum length of 5/8-inch by 1 5/8 inches to0:3 5/8 inches*.*
An -additional-eight:weldeturn*,-
eded the drawiAng-requi red: maxi mumi4 lhength of 3/4-inch by:1/2-'lto 2 1/8 inches.
: 3.
The absence of required MiscellaneOus-;StructuralSteel :Weld Records (MSSWRs) for documenting welding and inspection of safety-related structural, steel weldied conhnections-was itidenttified byKG&E in CAR No.
1-C-0031.
As-a result Of this identification, it has-been established that approximately 16 percent of MSSWRs could not be located, which precludest positi ve-verification of ;control of welding n
an&&#xfd;peformance I. A-147


Notice of Violation                                     3
Notice of Violation 3
          ..,of.,required.. :inspections .Approximately                   80 percent.of the MSSWRs Sapplicable to, the acti viti es-descriibed in paragraph. 2,,above                   could not
..,of., required.. :inspections.Approximately 80 percent.of the MSSWRs Sapplicable to, the acti viti es-descriibed in paragraph. 2,,above could not be-lcated.
                                                                                        &#xfd;that,. an- initial ,'
Records were not available to-, indcate &#xfd;that,. an-initial,'
be- lcated. Records were not available to-, indcate inspectipn: was,, performed, of eijther _the pressu.rizer .support connections or .,the auxi I iary .,building, structural: connection, whicwasi~de~ntifie       to-b,       isn       towls MSSWRs.were         ocatted f r,frcertain w'elds in, four- structural, connecti ons, ol whi ch-ihdicated ac-ceptable welds. However, reinspection of these' four.connecti.ons,. thopqwed*one., Undersi zed&#xa5;Wel d:- n .one. connection and! "j
inspectipn: was,, performed, of eijther _the pressu.rizer.support connections or.,the auxi I iary.,buildi ng, structural: connection, whic wasi~de~ntifie to-b, isn towls MSSWRs.were ol ocatted f r,fr certain w'elds i n, four-structural, connecti ons, whi ch-ihdicated ac-ceptable welds.
            .--undersized., and-.bverlengthf wel direturns in ithe four connections.
However, reinspection of these' four.connecti.ons,. thopqwed*one., Undersi zed&#xa5;Wel d:- n.one. connection and!  
This is aa.'Severity' Level           I II Vi ol ati on.. - J(Supplement II.C)
"j
CivilVPenalty $75,000 II. Vi olation!. Not.* Assessed a- Ci vi I*P.enail ty,-.;
.--undersized., and-.bverlengthf wel direturns in ithe four connections.
Criterion             of 10' CFRR-50 ,Appbnd*.x*,jBrequi         res, that ac.tivi ties affecting.
This is aa.'Severity' Level I I I Vi ol ati on.. - J(Supplement II. C)
    ,:qual ,ty.,.sha!l, be-.ac.*ompished.*.Tn,:accordance'., with- appropritateO. i nstructi ons procedures ,'and! drawings, andthatthese instructions, procedures, and drawi ngs&sect;, contain- appropri atewquanti tat i ve:--acceptance., criteri a.
CivilVPenalty $75,000 II.
Bechtel Drawing E-1!R890,0,           Rev ision.1,1 .- Raceway., Notes.,     Symbol s and Details         staesn-paragraph 3.,36:4;that:,&#xfd; "Mi nijnum-separ*ation *between&#xfd;dijff, erent*-Class-. *IE. conduit>.systems andi, *nimiiiumnseparati on, betweenilCass i 1E- conduttsystems-, and non
Vi ol ation!. Not.* Assessed a-Ci vi I*P.enail ty,-.;
_..1E-c.E'ondi itisystims shall be 1"...Separation shall be measured ween the. outsi de, edges of,:-the conduit",,.                 .      -
Criterion of 10' CFRR-50,Appbnd*.x*,jBrequi res, that ac.tivi ties affecting.
Bechtel-. Drawing-E-01013(q);             Revision 11, requires "the. following:
,:qual,ty.,.sha!l, be-.ac.*ompished.*.Tn,:accordance'., with-appropritateO. i nstructi ons procedures,'and! drawings, andthatthese instructions, procedures, and drawi ngs&sect;, contain-appropri atewquanti tat i ve:--acceptance., criteri a.
: 1.       Paragraph 5.8x1. 6.- - "Within-the, control boards and:other panel's associ ated,;wjith:protection:systems,:L circuits:,and-instruments of differ~ent-sep*aration groups shall be. independent and physically
Bechtel Drawing E-1!R890,0, Rev is ion.1, 1.- Raceway., Notes.,
                      &#xfd;&#xfd;separatead hori zotally and vertically.by-a distance of 6 inche s".
Symbol s and Details staesn-paragraph 3.,36:4;that:,&#xfd; "Mi nijnum-separ*ation *between&#xfd;dijff, erent*-Class-. *IE. conduit>.systems andi, *nimiiiumnseparati on, betweenilCass i 1E-condut tsystems-, and non
              .2.     Pa'aagraph-'57*,       ,:3-,"Non-,safety,: rel ated- ci.rcui.ts Shall be
_..1E-c.E'ondi itisystims shall be 1"...Separation shall be measured ween the. outsi de, edges of,:-the conduit",,.
                        -separ~,dfom Class 1E cfircuits by, the same distances
Bechtel-. Drawing-E-01013(q); Revision 11, requires "the. following:
                        .....  ,Eappcable toCas         ECrcuts of different:groups".
: 1.
            .Cont ray tothe. above, the following-activities affecting quality were not, accomplished in accordance withappropriate drawings:
Paragraph 5.8x1. 6.- - "Within-the, control boards and:other panel's associ ated,;wjith:protection:systems,:L circuits:,and-instruments of differ~ent-sep*aration groups shall be. independent and physically
: 1.       There were seven cases noted where conduit-to-conduit separation ,
&#xfd;&#xfd;separatead hori zotally and vertically.by-a distance of 6 i nche s".
was less than one, inch;.               -
.2.
: 2.       There werefiyve -areas, in the control panels and-cabinets where S.-,   lectrical cableseparation waslIess. than six inches; This.is a Severity Level IV Violation (Supplement II).
Pa'aagraph-'57*,  
,:3-,"Non-, safety,: rel ated-ci.rcui.ts Shall be
-separ~,dfom Class 1E cfircuits by, the same distances
,Eappcable toCas ECrcuts of different:groups".
.Cont ray tothe. above, the following-activities affecting quality were not, accomplished in accordance withappropriate drawings:
: 1.
There were seven cases noted where conduit-to-conduit separation,
was less than one, inch;.
: 2.
There werefiyve -areas, in the control panels and-cabinets where S.-, lectrical cableseparation waslIess. than six inches; This.is a Severity Level IV Violation (Supplement II).
I. A-148
I. A-148


Notice of Violation                                 4 Pursuant to-the provisions of 10 CFR 2.201, Kansas Gas and Electric Company is hereby required to submit to the Deputy Director., -Office of &#xfd;;Inspection -and Enforcement, USNRC, Washington, D.C. 20555, with a copy to this office,. within 30 days of the date of this Notice, a written.statement;orexplanati~on .in I reply, including for each alleged violation.                   (1) admission-or denial of thet alleged violation; (2) the'reasons for the violation, if admitted;'(3) the!
Notice of Violation 4
Pursuant to-the provisions of 10 CFR 2.201, Kansas Gas and Electric Company is hereby required to submit to the Deputy Director., -Office of &#xfd;;Inspection -and Enforcement, USNRC, Washington, D.C.
20555, with a copy to this office,. within 30 days of the date of this Notice, a written.statement;orexplanati~on.in I reply, including for each alleged violation.
(1) admission-or denial of thet alleged violation; (2) the'reasons for the violation, if admitted;'(3) the!
corrective steps that will-be taken and the results achieved; (4),the
corrective steps that will-be taken and the results achieved; (4),the
,* corrective steps that will be taken to avoid further violations;, and&(5) the date when full compliance will be achieved.; Consideration _.may be given toi,.
,* corrective steps that will be taken to avoid further violations;, and& (5) the date when full compliance will be achieved.;
extending the response time for good cause shown.                   Under ;the. autho.r~ity of Section 182 of the Act, 42 U.S.C. 2232, this response shall be*;ubmittedunder oath or affirmation.
Consideration _.may be given toi,.
Within the same time as provided for the response required-above'under 10 .:CFR 2. 201,.-Kansas:1,Gas and,-Electric Company, .may..pay -,the c'*ivil., penalty. in:,.
extending the response time for good cause shown.
    ,the amount of $75,000 or may protest imposition of the civil.'penalty in-,
Under ;the. autho.r~ity of Section 182 of the Act, 42 U.S.C. 2232, this response shall be*;ubmittedunder oath or affirmation.
whole or in part by a written answer.*-:, &#xfd;Should.Kansas ,Gas :and &#xfd;Electric&#xfd; Company.:
Within the same time as provided for the response required-above'under 10.:CFR 2. 201,.-Kansas:1,Gas and,-Electric Company,.may..pay -,the c'*ivil., penalty. in:,.
,the amount of $75,000 or may protest imposition of the civil.'penalty in-,
whole or in part by a written answer.*-:, &#xfd;Should.Kansas,Gas :and &#xfd;Electric&#xfd; Company.:
Kfail to answer within the time specified, the Deputy Director, Office of
Kfail to answer within the time specified, the Deputy Director, Office of
    ,Inspection and Enforcement, will. issue &#xfd;an .orde~ri. ;imposing, the ,civ-i:l .*;pena&#xfd;lty in i the amount proposed above.             Should Kansas Gas and Electric Company elect to file an answer in accordance with 10, CFR-:2_. 2.0Q5 pr,.t-est&#xfd;Ang sthe cj.viv ijly.,pena~l tyi-, such answer may: (1) deny the violations listed in the Notice in whole or in part; i.(2) demons.trate extenuaating ci rcums$tances ;s.(. 3 ) .!shQw error in .th:i:s MNotice; .or K(4) show other reasons why the penalty should not be imposed.                     In addition to protesti ng *thee civil, -penalty. in whooele or,, inpart*,,suckhanswer may--request ,
,Inspection and Enforcement, will. issue &#xfd;an.orde~ri. ;imposing, the,civ-i:l.*;pena&#xfd;lty in i the amount proposed above.
remission or mitigation of the penalty. In requesting mitigation of *_the proposed penalty, the five factors contained in section V.B of 10 CFR Part 2, should be addressed.             Any %writtenanswer n~accordance,,with.:.10, CFR 2.205 should be set forth separately from the statement or explanation in reply pursuant to 10i.CFR 2,.201-,, but may,-incorporate- b.specif;ic*r eference&#xfd; (e-..g. ,..),ci-ti-ng-,page&#xfd; ;and;*,
Should Kansas Gas and Electric Company elect to file an answer in accordance with 10, CFR-:2_. 2.0Q5 pr,.t-est&#xfd;Ang sthe cj.viv ijly.,pena~l tyi-, such answer may:
pargraph. numbers)-.             4tY ao1id repetitio*n-.,.. The at~tention Of --Kansas, Gas,.and,.
(1) deny the violations listed in the Notice in whole or in part; i.(2) demons.trate extenuaating ci rcums$tances ;s.(. 3 ).!shQw error in.th:i:s MNotice;.or K(4) show other reasons why the penalty should not be imposed.
        ~c..t r:ic,.Company..i s.dir*cted o&#xfd;the Othernpyovisionsoo 0.CFRl.2.205 regarding; the procedure .for imposing af ivil pehal 1 ty.,'                -    '
In addition to protesti ng *thee civil, -penalty. in whooele or,, inpart*,,suckhanswer may--request,
Upon failure to pay any civil penalty due Which has been subsequently netermined.in accordance with the appli cableg p ov.i isponst of--10 C:FR 2-,-205, this, ,
remission or mitigation of the penalty.
    'matter Imay *be referred to the..Attoriney General, *,andthe penalty                   9 5unles.s-compromised, remitted, or mitigated, may be collected by civil actioo pursuant to Section 234c of the Act, 42 U.S.C. 228Z..
In requesting mitigation of *_the proposed penalty, the five factors contained in section V.B of 10 CFR Part 2, should be addressed.
Any %written answer n~accordance,,with.:.10, CFR 2.205 should be set forth separately from the statement or explanation in reply pursuant to 10i.CFR 2,.201-,, but may,-incorporate-b.specif;ic*r eference&#xfd; (e-..g.,..),ci-ti-ng-,page&#xfd; ;and;*,
pargraph. numbers)-.
4t Y ao1id repetitio*n-.,.. The at~tention Of --Kansas, Gas,.and,.
~c..t r:ic,.Company..i s.dir*cted o&#xfd;the Othernpyovisionso o 0.CFRl.2.205 regarding; the procedure.for imposing af ivil pehal1ty.,'
Upon failure to pay any civil penalty due Which has been subsequently netermined.in accordance with the appli cab leg p ov.i sp i ons t of-  
-10 C:FR 2-,-205, this,,
'matter I may *be referred to the..Attoriney General, *,andthe penalty 9 5unles.s compromised, remitted, or mitigated, may be collected by civil actioo pursuant to Section 234c of the Act, 42 U.S.C. 228Z..
FOR THE NUCLEAR REGULATORY COMMISSION S*&deg;Robert D. Martin Regional Administrator Dated at Jhrlington, Texas
FOR THE NUCLEAR REGULATORY COMMISSION S*&deg;Robert D. Martin Regional Administrator Dated at Jhrlington, Texas
    <this -2frrway of November 1984 I.A-149}}
<this -2frrway of November 1984 I.A-149}}

Latest revision as of 04:33, 14 January 2025

Notice of Construction Reactor Oversight Process Category 2 Public Meeting Handout: Wolf Creek 2, Notice of Violation and Proposed Imposition of Civil Penalty, Dated 11/21/1984
ML101620490
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/16/2010
From: Mattern K
NRC/NRO/DCIP/CAEB
To:
Mattern, Kevin, NRO/DCIP/CCIB, 415-6622
References
EA-84-107, IR-84-022
Download: ML101620490 (7)


Text

m*iitigated by 25%.

An Order for $130,000 was issued on January 16, 1985'and the licensee paid the civil penalties on January 31, 1985.

Connecticut Yankee Atomic Power Company, Hartford, Connecticut (Haddam Neck Plant) EA 84-115, Supplement I An Order Modifying License and Notice of Violation and Proposed, Imposition of Civil Penalty in the--amount-df :$80,OO -was fssued'on December 13, 1984 based on. the failure of the reactor.refuel ing cavity.seal and ohe'resultatdrainihjof the reactor coolant waterýnr the-cavity torthe containmenit floor.

An Order wasjssued to ensure improvements in the design change modification program.

..Theliicensee responded and paid the civil,penalty,opnJanuary 28, Kansas' as -and ectri Company, 'W-ichita, Kansas

.(WolCMV-e4Gnerat g Station)e "a-84-107, Supplement II ndPrN6tio*ofdVialoh aImh-vil Penalty in o.,he%

m ount... f $715,9000" issuedon Nv ber ?1, 1 84 ed on a nif~catrtie "sprogram for the

  • ... iff"'

i a, n t,

,ovih

-:t 1censee fnspection

')

I.

I11'I l

I i

Ib I

I LI L.LU I

%,VI I

)

UI IUI I

a S

n *lesee resnpoedbd em De and 3; 1984,.and1nkluded J,.R, T*

~

n "'*

,cem*,

er

ý.i, NeCsk Vl naeysT,*ea ponse.

ic~lI

.IýlA ll) i ;p "y-i~T ~

ofI Cvl Pnaty i survpaymentollanc e test oe nit b a tter lesiense andhpaiddtheacivieeria*Ttompeorm 1n85.

Ne~as urveilac etests ft b

es.

T 1*U "

f.~4

ý

-ki*

4-*: iT

" 't i;

anpdr

-pu~ aid

'tth.

.ll,:EnA t on x1a2 ch..14,l 18em.

e Pennsylvania Power an&dLighttýCompany,. Allentown,.Pennsylvania..

(Si

ýnjta E ettric' Stati~on,ý_ Unit2

A419 Supplemet I SA tiN*t 'ofV1i0o*tion

,and Prosed ipostonof viPnaty in the 't0amount;0of

.5W0O, was-issue0 Won Decemer 18, 1984 based on an event that i n iVe1d:' 'd c l"e***:, 0§,-;*

  • '0..'
,, 1,,*: -

i.;**

f r

complete loss of all low-pressure emergency core cooling systems for.approximately43minutes.,

The licensee responded.and, trie nlto _J a nda ýy1 195 Tennessee Valley.,Aut~hority, Chattanooga, Tennessee.

(roWn~s. Fe~r~y.Nucl~ear Pan' 1,i'~f 2, an 3),

U, 84-OSpen I

.... Noieof'*ce o

lation and.ropo6eod'£IimipoStidn or Civi Penalties in etham

d.

.$10'0 isasu*u.6fd 6w:aeary28"!i985jbased on three viol at ions which gel ated' to a..core.,spray overpressurization event pand othe rv~latfons'which 'collectiv 71 iV~at J'r 6Fon w ivei r~~sn~i equate impemenyq.6 O ne_ lcensees quaity ce program ensee' 'responded and'paidte civiI p

-enalty on February 27, 1985.

4 L

~~-.t***.

'>**~

-~ *<..

I

~9 A UNITED STATES NUCLEAR REGULATORY COMMISSION Il"...L.J REGION IV

,I*'IWI':*I 611 RYAN PLAZA DRIVE. SUITE 1000 ARUNGTON. TEXAS 76011 Docket:

STN 50-482/84-22 EA 84-;O7.107 NOV `2j Kansas Gas 'and Electricd Company'-

ATTN:,,-Glenn L. Koester'.

-Vice' Pre'sd nt -

Ncleairý Wichita, Kansas ',67201;'

Gentlemen:

SUBJECT:

. -NO-TCE OF VIOLATION AND PROPOSED IMPOSITION 4OF CIVIL PENALTY

,This refers.totheinspectionconducted.

byMr,, R. G. Ta lorand other Region IV personne i dujrin the periOd Ju'ne 11, through-September 28, 1984.of activities tructnnon

ý

'z,:,ýI

--.Wol.1 authori zed by NRC. Construction e',t CPPR-1' for t'ýhe Wolf Creek.Generating Station. ? ne,,eu Its of the - nspecti~on 'were dic~sejwt

§;!.F.Dud and 9oher "Mmes Of your sta*ff at econc"usionof! the.inspection 6

andfiduring an EnAforl`emnt' Coex ren hl.u

-October- -29, 1498C.

t..

N `..Rexgon'.V ff i ce in rTe with`ybui omemersof the,Kainsas as d staff 1n.mte.'*ana.e.so o tnV, D

Two violations.,were Identiftied durig- -thiis inspection.",.They are described in the encloseOd,1Noti'ce of Violatln'aind'Proposed-Imhposition of Civil Penalty.

ViolI at ion* 1"re, rpresents a " significat brea kdowni n' y, program for the inspection -and correction of defective safety-related structural steel welds.

To emphasize --te n'eed for'KanasGasand ElectrW company managemne'ntto"ensure an effe:t~ye,,qd~al:ty a

,,ih1Oitsur

-tanh**sln*ogr'aii

.ha s bi nimplemented that4 K

th:ldenti fies and corrects construct'i'on deficiencieSi, I*h-a-ve bee-uh-ath6r;-ized, afatiýe:-

consul tatib'n. ýwi th the Deputy Di rector,- Office of. Inspecti on and: Enforcement, i "-"

e

,th 1"?'....

Not sceco T;:*

T-- O*

t-"

r" I. M, o...

I Civi..l". '.

to issue theenclosed.'Notice>of-Vio~ation, and Proposed Imposition of Civil Penalty in; the amount oft Senventy. five Thousand Dolars, ($75,000) for this viol ati on.-,q,,lThe-.viol atl on, has*cbeen*,categorized asý,-a. *Severifty., Level IfIIviovloation in accordance with the NRC Enforcement

iPolcy, 10 CFR Part 2, Appendix C, 49 FR 8583 (March" 81,

'1984)."1The"base civil penalty for a Severity. Level III violation is $50,000.

Hwevier, 7inc y6ou fai led ib tCake adequate corrective actions for the po'blhems Jide`n'tifi'fd 'by Corrective Action Requests CAR No.

I-W-0029 (initiated on March 22,, 1983) and CAR No. 1-W-0031 (issued Au~ust 16-,1983)," the*as, civil* penalty is being escalated by 50%.

Violation II has beeh categoriied as* a'Severity Level IV violation for which no civil penalty-is proposed.'

You are required to.respond to the enclosed Notice of Violation and Proposed Imposition of Civil Penalty.

In preparing your response you should follow the instructions, specified' in the.,Notice.- Your reply-to this letter and the results of future inspections will be, considered in determining whether further enforcement action is warranted.

CERTIFIED MAIL RETURNRCIT REQUESTED I. A-144

Kansas Gas and Electric Company 2

In accordance with 10 CFR 2.790, of the NRC's "Rules of Practice," Part 2, Titl.e, 10, Code of Federal. Regulations, a copy of this letter and the enclosures xwill. be placed, in the: NRC"s Publice, Document. Room.

The responses directed by -this letter and the enclosed Notice are not isubject to the clearance procedure of the Office of Management and Budget as.,required by the Paperwork Reduction Act: of:1980, PL 96-5-1,.,:

-Sincerely.,

Original Signe-ry i

S l;:

Robert Region D.

,.IV Martin, -Regional

ý,.

t

, ý '

Admini strator

Enclosure:

Notice of Violation and Proposed Imposition of Civil Penalty cc:* - w/enclosure Kansas Gas and:Electric Company

-ATTN:

Gene. -.P,-.-ý,Rathbun,*Manager of Licensing

-"P.O.. Box 208 Wicchita, Kansas-,- 67201-.;.

Forrest Rhodes, Plant Superintendent Wolf, C.reek, Generati*ng, Station..

P.O. Box 309 Burlington, Kansas 66839 A

I.A-145

NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTY Kansas Gas and Electric Company Wolf Creek Generating Station Docket:

Permit:

EA 84-107 50-482/84-22 CPPR-147 As -a! -resudlitý of, an' NRC.inspection conducted during, the period, 6f June, 11,. 1984i ':

through September-28,ý 1984, two viol'ations; were idehtif ied one' ofý whichK repre's4 a significant breakdown in the licensee's program for the inspection and corre4 of defelctiive -safety-.related-structurali steel welds.;*- To emphasi-zei the, need-for, Kansas Gas ýan&d,.Elec'triicý.'Company:" management, tbo *ensturei an-'effective* qual~ity* r!;{a inspection plrogram-.has. been implement id that.,both idehtifies and.corrects-construction defic4-enc-ies, the Nuclear Regulatory Commission proposes to imposi a civil.penalty in the amount of Seventyy-'five Thousand Dollars ($75,000),for*

this violation..

In. accordance with the NRC..Enforcement Policy, 10 CFR Part 2, Appendix C, as revised, 49 FR 8583 (March 8, 1984), and pursuant to Section 234 of the Atomic Energy Ac'ot ;as*.amended.(,Act.I),,.42*US:.C.*

2282, PL 96-295 and 10 CFR 2.205, the particular violations ahd eth'eyassociated civil penalty is set forth in Section I below:

.I.

Civil Penal~ty--Viol.ation J

Criterion Xf, of" -10 CFR Part 50, Appendix B, requires that a program for inspection of activities 'affecting qualityl be established and&eXecuted, by;:

o or the organization performing the acti.vito-Veri*fy, conformance 1wi~th -

the6 do"c" "m nented ihst~ruc tion'sp' rocdurs ad Td~wig or -acconiplishinhg-AT the IactiVity.

J Crit6eion XVI of Appendix.B furtherfrequires that measures.be,,established d.

to assure.*that nonconforimances' are IpromptlIy identified' and..correcýcted.

Criterion, XVII requires* that sufficient-records.be: maintained.- to6-furni'sh6 evidence of. activities affecting.quality.

Daniel International, Corporation (DIC) Construction Procedure No.

QCP-VII-200 describes the -requirements for performance and inspection of safety-related structural steel welds with-respect to committed conformance to. the Amernican Welding Society (AWS), D1.1.--75.'

Appendix I in Revision 4-f this 0procedure: inhVkes a prohibition with respect to lack of fUsion,overla'p, slag, arc strikes, andweOld splatter. ý Paragraph 6.5.1 of AWS.l~-75requires ihiector..ver'ificat~ion 'thatthe size and length *of welds conform to the drawing requirements and that no specified welds are om itte d.

Contrary to the above, the inspection program for safety-related'structural steel welds was not adequately executed to assure conformance to the

,requirements of Construction Procedure QCP-VII-200 Revision 4 and the AWS D1.1-75 Code nor. were adequate, records kept to document the quality of the welds... Furthermore, once deficient welds -wer'e identif ied,. no actions, were taken to correct the deficiencies.

This inadequate inspection program and the failure to take corrective actions is evidenced by the following:

I. A-146

Notice of Violation 2

1. 'A random reinspection of 241 structural" steel safety-relateAdwelds, which were made-in accordance with Revision 4 of QCP-VII-200,' was performed by DIC and' documented in Correct~ive Action Repbrt' (CAR)

No.-I.-W-0029, dated March-22,A1983.

SixtytWo -percent o the inspected welds were found by the DICI i nspectors. tonot con'fbrm to the requirements of Revision-4 of QCP-VII-200.

The reported defects that resulted in rejection-by the DIC inspectors included arc strikes, slag,`

ack "of fusion, overlap and weld splatter.

2.

Another reinspection of a sample of structural-members-:with the lowest-design safety margins Wast in nitiated' on September.' 14.iY.'4984.

The results of the licensee reinspection activities (verified by NRC inspectbrs).;as, tof Septembeir-_`28-, 1984, :were as' foll6ws::,-"',

a.

A missing weld was found at the same location in each of six pressurizer supportcý;,onnections.Iný addition,'ifive*of 14 fillet welds in one pressurizer support connection were unders i zed. by-1/8-incrh to 1/4-i nch with respect to the' drawing-required-size-, of 5/8-inch,' and 'two of ihese'* *wels were*alsob. under'.thez required,, ength; i.e., 3-inh and,-

5-inch lengths:,' respectivelyi, versus t4adrawi ng-=reiquired'"

length of 8 inches.

The weld dimensions of the remaining five" pressurizer support, connectiOns we're not included in' the NRC veri fi cation ýacti vity.

Sb.

.Reinspectionf hi nine. strctural steel onnections', inthe

",aux-iliary` bufilding ident1i40 two rmiSs

,inwelds1 ih3bn,.

connectilon

~I n"-add iti on,, *wld zsieo-a-d "lnth-d-Icipnis were identified' ineach of,?the niiecbnne*'tionh;':

  • Ofih total of 106 welds* in the connections,, eight were found to be uihdersi~zed: lby./6 i hc'

ý"j1ý- ~hwtP-drawing-required width'.- 'Two of the. unders*ized iwelds Werealso under 'the:::req uiredIenhth;,i.e

'2 2**__4 1Y4 chahd 2:1/2-ifch lerfgths,-_`.respect-ively, dIVersus a-ýdrawing' requiredength of 3

- inches.','"An.addiTti-ona-r-ni ne-wel dswere also-underthe drawing-requi W -length.of 3 inhchs' by1,2Z'ihct-1-irch.

Examination of 54 weld returns-in the nine connhetions found 26 to be undersized by 1/16-inch to.3/16-inch with'.respect to drawing'requi red wdths.kOneof theýund'r*id ield 'returns was

-a'lso"Uridert th'ereýquir'edlength; -,-i,--e,,ýý*2 inchsveus-a drawi ng-

-required7 size of 3 inchesI*

n addition, 36`wel*d rturns* exceeded the'drawing-required maximum length of 5/8-inch by 1 5/8 inches to0:3 5/8 inches*.*

An -additional-eight:weldeturn*,-

eded the drawiAng-requi red: maxi mumi4 lhength of 3/4-inch by:1/2-'lto 2 1/8 inches.

3.

The absence of required MiscellaneOus-;StructuralSteel :Weld Records (MSSWRs) for documenting welding and inspection of safety-related structural, steel weldied conhnections-was itidenttified byKG&E in CAR No.

1-C-0031.

As-a result Of this identification, it has-been established that approximately 16 percent of MSSWRs could not be located, which precludest positi ve-verification of ;control of welding n

an&ýpeformance I. A-147

Notice of Violation 3

..,of., required.. :inspections.Approximately 80 percent.of the MSSWRs Sapplicable to, the acti viti es-descriibed in paragraph. 2,,above could not be-lcated.

Records were not available to-, indcate ýthat,. an-initial,'

inspectipn: was,, performed, of eijther _the pressu.rizer.support connections or.,the auxi I iary.,buildi ng, structural: connection, whic wasi~de~ntifie to-b, isn towls MSSWRs.were ol ocatted f r,fr certain w'elds i n, four-structural, connecti ons, whi ch-ihdicated ac-ceptable welds.

However, reinspection of these' four.connecti.ons,. thopqwed*one., Undersi zed¥Wel d:- n.one. connection and!

"j

.--undersized., and-.bverlengthf wel direturns in ithe four connections.

This is aa.'Severity' Level I I I Vi ol ati on.. - J(Supplement II. C)

CivilVPenalty $75,000 II.

Vi ol ation!. Not.* Assessed a-Ci vi I*P.enail ty,-.;

Criterion of 10' CFRR-50,Appbnd*.x*,jBrequi res, that ac.tivi ties affecting.

,:qual,ty.,.sha!l, be-.ac.*ompished.*.Tn,:accordance'., with-appropritateO. i nstructi ons procedures,'and! drawings, andthatthese instructions, procedures, and drawi ngs§, contain-appropri atewquanti tat i ve:--acceptance., criteri a.

Bechtel Drawing E-1!R890,0, Rev is ion.1, 1.- Raceway., Notes.,

Symbol s and Details staesn-paragraph 3.,36:4;that:,ý "Mi nijnum-separ*ation *betweenýdijff, erent*-Class-. *IE. conduit>.systems andi, *nimiiiumnseparati on, betweenilCass i 1E-condut tsystems-, and non

_..1E-c.E'ondi itisystims shall be 1"...Separation shall be measured ween the. outsi de, edges of,:-the conduit",,.

Bechtel-. Drawing-E-01013(q); Revision 11, requires "the. following:

1.

Paragraph 5.8x1. 6.- - "Within-the, control boards and:other panel's associ ated,;wjith:protection:systems,:L circuits:,and-instruments of differ~ent-sep*aration groups shall be. independent and physically

ýýseparatead hori zotally and vertically.by-a distance of 6 i nche s".

.2.

Pa'aagraph-'57*,

,:3-,"Non-, safety,: rel ated-ci.rcui.ts Shall be

-separ~,dfom Class 1E cfircuits by, the same distances

,Eappcable toCas ECrcuts of different:groups".

.Cont ray tothe. above, the following-activities affecting quality were not, accomplished in accordance withappropriate drawings:

1.

There were seven cases noted where conduit-to-conduit separation,

was less than one, inch;.

2.

There werefiyve -areas, in the control panels and-cabinets where S.-, lectrical cableseparation waslIess. than six inches; This.is a Severity Level IV Violation (Supplement II).

I. A-148

Notice of Violation 4

Pursuant to-the provisions of 10 CFR 2.201, Kansas Gas and Electric Company is hereby required to submit to the Deputy Director., -Office of ý;Inspection -and Enforcement, USNRC, Washington, D.C.

20555, with a copy to this office,. within 30 days of the date of this Notice, a written.statement;orexplanati~on.in I reply, including for each alleged violation.

(1) admission-or denial of thet alleged violation; (2) the'reasons for the violation, if admitted;'(3) the!

corrective steps that will-be taken and the results achieved; (4),the

,* corrective steps that will be taken to avoid further violations;, and& (5) the date when full compliance will be achieved.;

Consideration _.may be given toi,.

extending the response time for good cause shown.

Under ;the. autho.r~ity of Section 182 of the Act, 42 U.S.C. 2232, this response shall be*;ubmittedunder oath or affirmation.

Within the same time as provided for the response required-above'under 10.:CFR 2. 201,.-Kansas:1,Gas and,-Electric Company,.may..pay -,the c'*ivil., penalty. in:,.

,the amount of $75,000 or may protest imposition of the civil.'penalty in-,

whole or in part by a written answer.*-:, ýShould.Kansas,Gas :and ýElectricý Company.:

Kfail to answer within the time specified, the Deputy Director, Office of

,Inspection and Enforcement, will. issue ýan.orde~ri. ;imposing, the,civ-i:l.*;penaýlty in i the amount proposed above.

Should Kansas Gas and Electric Company elect to file an answer in accordance with 10, CFR-:2_. 2.0Q5 pr,.t-estýAng sthe cj.viv ijly.,pena~l tyi-, such answer may:

(1) deny the violations listed in the Notice in whole or in part; i.(2) demons.trate extenuaating ci rcums$tances ;s.(. 3 ).!shQw error in.th:i:s MNotice;.or K(4) show other reasons why the penalty should not be imposed.

In addition to protesti ng *thee civil, -penalty. in whooele or,, inpart*,,suckhanswer may--request,

remission or mitigation of the penalty.

In requesting mitigation of *_the proposed penalty, the five factors contained in section V.B of 10 CFR Part 2, should be addressed.

Any %written answer n~accordance,,with.:.10, CFR 2.205 should be set forth separately from the statement or explanation in reply pursuant to 10i.CFR 2,.201-,, but may,-incorporate-b.specif;ic*r eferenceý (e-..g.,..),ci-ti-ng-,pageý ;and;*,

pargraph. numbers)-.

4t Y ao1id repetitio*n-.,.. The at~tention Of --Kansas, Gas,.and,.

~c..t r:ic,.Company..i s.dir*cted oýthe Othernpyovisionso o 0.CFRl.2.205 regarding; the procedure.for imposing af ivil pehal1ty.,'

Upon failure to pay any civil penalty due Which has been subsequently netermined.in accordance with the appli cab leg p ov.i sp i ons t of-

-10 C:FR 2-,-205, this,,

'matter I may *be referred to the..Attoriney General, *,andthe penalty 9 5unles.s compromised, remitted, or mitigated, may be collected by civil actioo pursuant to Section 234c of the Act, 42 U.S.C. 228Z..

FOR THE NUCLEAR REGULATORY COMMISSION S*°Robert D. Martin Regional Administrator Dated at Jhrlington, Texas

<this -2frrway of November 1984 I.A-149