{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 9, 2010  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 9, 2010 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097  
 
Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097


==SUBJECT:==
==SUBJECT:==
Line 23: Line 21:


==Dear Mr. Bezilla:==
==Dear Mr. Bezilla:==
In a telephone conversation on October 19, 2010, Mr. A. Mueller, Perry Training Manager, and Mr. B. Palagi, Lead Inspector, made arrangements for the NRC to inspect the licensed operator requalification program at the Perry Nuclear Plant. The inspection is planned for the week of November 29, 2010, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.  
In a telephone conversation on October 19, 2010, Mr. A. Mueller, Perry Training Manager, and Mr. B. Palagi, Lead Inspector, made arrangements for the NRC to inspect the licensed operator requalification program at the Perry Nuclear Plant. The inspection is planned for the week of November 29, 2010, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
 
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the operating and written tests scheduled for the week of the inspection to the NRC by November 22, 2010. Additionally, to facilitate the efficient conduct of this inspection, please have available on site for review, the documents listed in the enclosure. Mr. Mueller has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the operating and written tests scheduled for the week of the inspection to the NRC by November 22, 2010. Additionally, to facilitate the efficient conduct of this inspection, please have available on site for review, the documents listed in the enclosure. Mr. Mueller has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.  
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
 
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.  
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.  
 
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Record s System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.
Sincerely,       /RA by R. K. Walton for/
Sincerely,  
Hironori Peterson, Chief Operations Branch Division of Reactor Safety  
/RA by R. K. Walton for/
 
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-440 License Nos. NPF-58  
Docket Nos. 50-440  
 
License Nos. NPF-58  


==Enclosure:==
==Enclosure:==
Documentation Requested to be Available Onsite during the Inspection Week cc w/encl:
Distribution via ListServ


Documentation Requested to be Available  Onsite during the Inspection Week 
Enclosure 1
DOCUMENTATION REQUESTED TO BE AVAILABLE ONSITE DURING THE INSPECTION WEEK Technical Specifications/License Operator Requalification Training (LORT) program procedures/Conduct of Operations administrative procedures; Current cycle crew and individual examination evaluations for weeks prior to the exam week inspection; Sample Plan (Master List) for this years annual examination and how derived; The 24-month training plan for the training current cycle; Attendance records for LORT; Applicants pass/fail results for written exams, individual operating tests and simulator operating tests for each requalification cycle; Records related to remediation of recent annual exam failures, and any past failures over the last 2 years; Complete Annual Exam Schedule illustrating operating and staff crews: names, positions, dates, and times for exam administration; LORT related condition reports written in the last year; The last QA audit that evaluated your requalification program; Any operations and LORT self-assessments done during the 2-year training cycle; Operator, instructor, management feedback during the 2-year training cycle; Curriculum review committee meeting minutes for past training year; Proficiency watch list for active/reactivated licenses, including procedure for how you keep track of proficiency watches and license restrictions; Access to complete licensed operator medical records; Lesson plan(s) addressing: Plant Events/LERs/SOERs/Mods/Lessons Learned; Applicable ANSI 3.5 Standard for simulator fidelity; Simulator evaluations for any EOP operator response time(s) based on UFSAR time limits performed during the 2-year cycle (e.g., SGTR...);
Simulator open items list and performance indicators;


cc w/encl: Distribution via ListServ 
Enclosure 2
Simulator management and configuration control procedure(s);
List of open simulator discrepancies; List of closed simulator discrepancies for the last 12 months; and Simulator performance tests: Transient, Malfunction, Core Performance, Normal Plant Evolution, Operator Conducted Surveillance...including applicable plots/trends.


Enclosure 1DOCUMENTATION REQUESTED TO BE AVAILABLE ONSITE DURING THE INSPECTION WEEK Technical Specifications/License Operator Requalification Training (LORT) program procedures/Conduct of Operations administrative procedures; 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.
Current cycle crew and individual examination evaluations for weeks prior to the exam week inspection; 
Sincerely,  
 
/RA by R. K. Walton for/
Sample Plan (Master List) for this year's annual examination and how derived;
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20  
 
The 24-month training plan for the training current cycle; Attendance records for LORT; Applicants pass/fail results for written exams, individual operating tests and simulator operating tests for each requalification cycle;
! Records related to remediation of recent annual exam failures, and any past failures over the last 2 years; Complete Annual Exam Schedule illustrating operating and staff crews:  names, positions, dates, and times for exam administration; LORT related condition reports written in the last year; The last QA audit that evaluated your requalification program;
 
Any operations and LORT self-assessments done during the 2-year training cycle;
 
Operator, instructor, management feedback during the 2-year training cycle;
 
Curriculum review committee meeting minutes for past training year;
 
Proficiency watch list for active/reactivated licenses, including procedure for how you keep track of proficiency watches and license restrictions;
 
Access to complete licensed operator medical records; Lesson plan(s) addressing:  Plant Events/LERs/SOERs/Mods/Lessons Learned; Applicable ANSI 3.5 Standard for simulator fidelity;
 
Simulator evaluations for any EOP operator response time(s) based on UFSAR time limits performed during the 2-year cycle (e.g., SGTR...);
Simulator open items list and performance indicators; Enclosure 2 Simulator management and configuration control procedure(s);
List of open simulator discrepancies; 
 
List of closed simulator discrepancies for the last 12 months; and
 
Simulator performance tests:  Transient, Malfunction, Core Performance, Normal Plant Evolution, Operator Conducted Surveillance...including applicable plots/trends.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Record s System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.  
 
Sincerely,
      /RA by R. K. Walton for/
Hironori Peterson, Chief  
 
Operations Branch  
 
Division of Reactor Safety Docket No. 50-255 License No. DPR-20  


==Enclosure:==
==Enclosure:==
 
Documentation Requested to be Available Onsite during the Inspection Week cc w/encl:
Documentation Requested to be Available   Onsite during the Inspection Week
Distribution via ListServ DISTRIBUTION:
 
Daniel Merzke RidsNrrPMPerry RidsNrrDorlLpI3-2 RidsNrrDirsIrib Resource Steven West Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource DOCUMENT NAME: G:\\DRSIII\\DRS\\Work in Progress\\PER 110910 DRS OL Requalification Inspection.docx 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of his document, indicate in the box: " " = Copy without attachment/enclosure "E" = Copy with attachment/encl sure "N" = No copy t
cc w/encl: Distribution via ListServ  
C o
 
OFFICE RIII RIII NAME BPalagi:co HPeterson RKW for DATE 11/09/10 11/09/10 OFFICIAL RECORD COPY}}
DISTRIBUTION
: Daniel Merzke  
 
RidsNrrPMPerry  
 
RidsNrrDorlLpI3-2  
 
RidsNrrDirsIrib Resource  
 
Steven West Steven Orth Jared Heck Allan Barker  
 
Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource
 
DOCUMENT NAME:
G:\DRSIII\DRS\Work in Progress\PER 110910 DRS OL Requalification Inspection.docx Publicly Available Non-Publicly Available       Sensitive         Non-Sensitive To receive a copy of his document, indicate in the box: "" = Copy without attachment/enclosure   " E" = Copy with attachment/enclsure  " N" = No copy t C o O FFICE R III  R III      NAME B Palagi:co  
 
H Peterson  RKW for  
 
DATE 11/09/10 11/09/10 OFFICIAL RECORD COPY}}

Latest revision as of 01:27, 14 January 2025

Requalification Program Inspection
ML103140688
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/09/2010
From: Hironori Peterson
Operations Branch III
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
Download: ML103140688 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 9, 2010 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION

Dear Mr. Bezilla:

In a telephone conversation on October 19, 2010, Mr. A. Mueller, Perry Training Manager, and Mr. B. Palagi, Lead Inspector, made arrangements for the NRC to inspect the licensed operator requalification program at the Perry Nuclear Plant. The inspection is planned for the week of November 29, 2010, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the operating and written tests scheduled for the week of the inspection to the NRC by November 22, 2010. Additionally, to facilitate the efficient conduct of this inspection, please have available on site for review, the documents listed in the enclosure. Mr. Mueller has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.

Sincerely,

/RA by R. K. Walton for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-440 License Nos. NPF-58

Enclosure:

Documentation Requested to be Available Onsite during the Inspection Week cc w/encl:

Distribution via ListServ

Enclosure 1

DOCUMENTATION REQUESTED TO BE AVAILABLE ONSITE DURING THE INSPECTION WEEK Technical Specifications/License Operator Requalification Training (LORT) program procedures/Conduct of Operations administrative procedures; Current cycle crew and individual examination evaluations for weeks prior to the exam week inspection; Sample Plan (Master List) for this years annual examination and how derived; The 24-month training plan for the training current cycle; Attendance records for LORT; Applicants pass/fail results for written exams, individual operating tests and simulator operating tests for each requalification cycle; Records related to remediation of recent annual exam failures, and any past failures over the last 2 years; Complete Annual Exam Schedule illustrating operating and staff crews: names, positions, dates, and times for exam administration; LORT related condition reports written in the last year; The last QA audit that evaluated your requalification program; Any operations and LORT self-assessments done during the 2-year training cycle; Operator, instructor, management feedback during the 2-year training cycle; Curriculum review committee meeting minutes for past training year; Proficiency watch list for active/reactivated licenses, including procedure for how you keep track of proficiency watches and license restrictions; Access to complete licensed operator medical records; Lesson plan(s) addressing: Plant Events/LERs/SOERs/Mods/Lessons Learned; Applicable ANSI 3.5 Standard for simulator fidelity; Simulator evaluations for any EOP operator response time(s) based on UFSAR time limits performed during the 2-year cycle (e.g., SGTR...);

Simulator open items list and performance indicators;

Enclosure 2

Simulator management and configuration control procedure(s);

List of open simulator discrepancies; List of closed simulator discrepancies for the last 12 months; and Simulator performance tests: Transient, Malfunction, Core Performance, Normal Plant Evolution, Operator Conducted Surveillance...including applicable plots/trends.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.

Sincerely,

/RA by R. K. Walton for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20

Enclosure:

Documentation Requested to be Available Onsite during the Inspection Week cc w/encl:

Distribution via ListServ DISTRIBUTION:

Daniel Merzke RidsNrrPMPerry RidsNrrDorlLpI3-2 RidsNrrDirsIrib Resource Steven West Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource DOCUMENT NAME: G:\\DRSIII\\DRS\\Work in Progress\\PER 110910 DRS OL Requalification Inspection.docx 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of his document, indicate in the box: " " = Copy without attachment/enclosure "E" = Copy with attachment/encl sure "N" = No copy t

C o

OFFICE RIII RIII NAME BPalagi:co HPeterson RKW for DATE 11/09/10 11/09/10 OFFICIAL RECORD COPY