ML103620076: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML103620076
| number = ML103620076
| issue date = 12/28/2010
| issue date = 12/28/2010
| title = 2005/12/31-NUREG/CR-6572, Rev. 1, BNL-NUREG-52534-R1, Kalinin VVER-1000 Nuclear Power Station Unit 1, PRA, Procedure Guides for a Probabilistic Risk Assessment
| title = NUREG/CR-6572, Rev. 1, BNL-NUREG-52534-R1, Kalinin VVER-1000 Nuclear Power Station Unit 1, PRA, Procedure Guides for a Probabilistic Risk Assessment
| author name =  
| author name =  
| author affiliation = Brookhaven National Lab (BNL), NRC/RES/DRA
| author affiliation = Brookhaven National Lab (BNL), NRC/RES/DRA
Line 20: Line 20:


=Text=
=Text=
{{#Wiki_filter:NUREG/CR-6572, Rev. 1 BNL-NUREG-52534-R1 Kalinin VVER-1000 Nuclear Power Station Unit 1 PRA Procedure Guides for a Probabilistic Risk Assessment English Version Brookhaven National Laboratory U.S. Nuclear Regulatory Commission Office of Nuclear Regulatory Research Washington, DC 20555-0001
{{#Wiki_filter:}}
 
NUREG/CR-6572, Rev. 1 BNL-NUREG-52534-R1 Kalinin VVER-1000 Nuclear Power Station Unit 1 PRA Procedure Guides for a Probabilistic Risk Assessment English Version Manuscript Completed: May 2005 Date Published: December 2005 Sponsored by the Joint Cooperative Program Between the Governments of the United States and Russia The BETA Project Brookhaven National Laboratory Upton, NY 11973-5000 Prepared for Division of Risk Analysis and Applications Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 NRC Job Code R2001
 
ABSTRACT In order to facilitate the pro ba bilistic risk assessment (PRA) of a VVER-1000 nuclear power plant, a set of procedu re guide s ha s be en w ritten. Thes e pro ced ure g uides, alon g with training supplied by experts and supplem entary m aterial from the literatu re, we re us ed to advance the PRA carried out for the Kalinin Nuclear Power Station in the Russian Federation. Although written for a specific project, these guides have general applicability. Guides are procedu res for all the technical tasks o f a L evel 1 (determination of core damage frequency for differen t ac cid ent scena rios), Level 2 (probabilistic accident progression an d source term analysis), and Level 3 (consequence analysis and integrated risk assessment) PRA. In addition, introductory material is provided to explain the ration ale an d ap proa ch fo r a PR A. Procedure guides are also provided on the documentation requirements.
iii
 
iv FOREWORD During the Lisbon Conference on Assistance to the Nuclear Safety Initiative, held in May 1992, participants agreed that efforts should be undertaken to improve the safety of nuclear power plants that were designed and built by the former Soviet Union. That agreement led to a collaborative probabilistic risk assessment (PRA) of the Kalinin Nuclear Power Station (KNPS), Unit 1, in the Russian Federation. The KNPS Unit 1 PRA was intended to demonstrate the benefits obtained from application of risk technology towards understanding and improving reactor safety and, thereby, helping to build a risk-informed framework to help address reactor safety issues in regulations.
The U.S. Department of State, together with the Agency for International Development (AID),
requested that the U.S. Nuclear Regulatory Commission (NRC) and the Federal Nuclear and Radiation Safety Authority of the Russian Federation (Gosatomnadzor, or GAN) work together to begin applying PRA technology to Soviet-designed plants.1 On the basis of that request, in 1995, the NRC and GAN agreed to work together to perform a PRA of a VVER-1000 PWR reactor. Under that agreement, the NRC provided financial support for the PRA with funds from AID and technical support primarily from Brookhaven National Laboratory and its subcontractors. KNPS Unit 1 was chosen for the PRA, and the effort was performed under the direction of GAN with the assistance of KNPS personnel and the following four other Russian organizations:
* Science and Engineering Centre for Nuclear and Radiation Safety (GANs and now Rostechnadzors technical support organization)
* Gidropress Experimental and Design Office (the VVER designer)
* Nizhny Novgorod Project Institute, Atomenergoprojekt (the architect-engineer)
* Rosenergoatom Consortium (the utility owner of KNPS)
One of the overriding accomplishments of the project has been technology transfer. In NRC-sponsored workshops held in Washington, DC, and Moscow from October 1995 through November 2003, training was provided in all facets of PRA practice. In addition, the Russian participants developed expertise using current-generation NRC-developed computer codes, MELCOR, SAPHIRE and MACCS. Towards the completion of the PRA, senior members of the Kalinin project team began the development of risk-informed, Russian nuclear regulatory guidelines. These guidelines foster the application of risk assessment concepts to promote a better understanding of risk contributors. Efforts such as this have benefited from the expertise obtained, in part, from the training, experience, and insights gained from participation in the KNPS Unit 1 PRA project.
The documentation of the Kalinin PRA comprises two companion NUREG-series reports:
* NUREG/CR-6572, Revision 1, Kalinin VVER-1000 Nuclear Power Station Unit 1 PRA:
Procedure Guides for a Probabilistic Risk Assessment, was prepared by Brookhaven National Laboratory and the NRC staff. It contains guidance for conducting the Level 1, 2, and 3 PRAs for KNPS with primary focus on internal events. It may also serve as a guide for future PRAs in support of other nuclear power plants.
1 As a result of a governmental decree in May 2004, GAN was subsumed into a new organization, known as the Federal Environmental, Industrial and Nuclear Supervision Service of Russia (Rostechnadzor).
v
* NUREG/IA-0212, Kalinin VVER-1000 Nuclear Power Station Unit 1 PRA: Volumes 1 and 2, was written by the Russian team and, by agreement, includes both a non-proprietary and proprietary volume. The non-proprietary volume, Volume 1, Executive Summary Report, discusses the project objectives, summarizes how the project was carried out, and presents a general summary of the PRA results. The proprietary volume, Volume 2, contains three parts. Part 1, Main Report: Level 1 PRA, Internal Initiators, discusses the Level 1 portion of the PRA; Part 2, Main Report: Level 2 PRA, Internal Initiators, discusses the Level 2 portion; and Part 3, Main Report: Other Events Analysis, discusses preliminary analyses of fire, internal flooding, and seismic events, which may form the basis for additional risk assessment work at some future time.
Carl J. Paperiello, Director Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission vi
 
TABLE OF CONTENTS Page Abstrac t . . . . . . . . . . . .......... . . ..........        . . ..........        . . ..........        . . ..........          . . . . . . . iii Foreword . . . . . . .    . . . .......... . . ..........        . . ..........        . . ..........        . . ..........          . . ..... v List of Figures . . .    . . . .......... . . ..........        . . ..........        . . ..........        . . ..........          . . ..... x List of Tables . . . .    . . . .......... . . ..........        . . ..........        . . ..........        . . ..........          . . . . . . . xi Acknowledgments          . . . .......... . . ..........        . . ..........        . . ..........        . . ..........          . . . . . . xii Acronyms . . . . . .      . . . .......... . . ..........        . . ..........        . . ..........        . . ..........          . . . . . . xiii
: 1. INTRODUCTION . . . . . . . . . . . . . . . . . .      . ......    . . . . . .......    . . . . . .......    . . . . . .......      . . 1-1 1.1 Background . . . . . . . . . . . . . . . . . .    . ......    . . . . . .......    . . . . . .......    . . . . . .......      . . 1-1 1.2 Objectives . . . . . . . . . . . . . . . . . . .  . ......    . . . . . .......    . . . . . .......    . . . . . .......      . . 1-1 1.3 Scope . . . . . . . . . . . . . . . . . . . . . . . ......    . . . . . .......    . . . . . .......    . . . . . .......      . . 1-1 1.4 Limitations and General Com ments                  ......    . . . . . .......    . . . . . .......    . . . . . .......      . . 1-3 1.5 References . . . . . . . . . . . . . . . . . .    .......    . . . . . .......    . . . . . .......    . . . . . .......      . . 1-3
: 2. APPROACH . . . . . . . . . . . . . . . . . . . .  .......    .....    . . ... . . .....    . . ... . . .....    . . ...  . . . . . . 2-1 2.1 Scope of a PRA . . . . . . . . . . . . .      .......    .....    . . ... . . .....    . . ... . . .....    . . ...  . . . . . . 2-1 2.2 Scope of the Guides . . . . . . . . .        .......    .....    . . ... . . .....    . . ... . . .....    . . ...  . . . . . . 2-2 2.2.1 Technical Guidance . . . .            .......    .....    . . ... . . .....    . . ... . . .....    . . ...  . . . . . . 2-2 2.2.2 Guidance for Peer Review              Process      ....    . . ... . . .....    . . ... . . .....    . . ...  . . . . . .2-8 2.3 References . . . . . . . . . . . . . . . .    .......    .....    . . ... . . .....    . . ... . . .....    . . ...  . . . . . . 2-9
: 3. TECHNICAL ACTIVITIES . . . . . . . . . .            .....  . . . . ........      . . . . ........      . . . . ........        . . . . . 3-1 3.1 Plant Familiarization . . . . . . . . . .      .....  . . . . ........      . . . . ........      . . . . ........        . . . . . 3-1 3.1.1 Assum ption and limitations                ....  . . . . ........      . . . . ........      . . . . ........        . . . . . 3-1 3.1.2. Produc ts . . . . . . . . . . . . . .  .....  . . . . ........      . . . . ........      . . . . ........        . . . . . 3-2 3.1.3 Task Activities . . . . . . . . .        .....  . . . . ........      . . . . ........      . . . . ........        . . . . . 3-2 3.1.4 Task Interfaces . . . . . . . .          .....  . . . . ........      . . . . ........      . . . . ........        . . . . 3-11 3.2  Level 1 Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . ..........        . . ..........        . . . . . . . . . . 3-11 3.2.1 Initia ting Event An alysis . . . . . . . . . . . . .        . . ..........        . . ..........        . . . . . . . . . 3-11 3.2.1.1 Assum ptions and Limitations . . .              . . ..........        . . ..........        . . . . . . . . . 3-11 3.2.1.2 Products . . . . . . . . . . . . . . . . . .    . . ..........        . . ..........        . . . . . . . . . 3-12 3.2.1.3 Analytical Tasks . . . . . . . . . . . . .      . . ..........        . . ..........        . . . . . . . . . . 3-12 3.2.1.4 Task Interfaces . . . . . . . . . . . . .      . . ..........        . . ..........        . . . . . . . . . . 3-19 3.2.1.5 References . . . . . . . . . . . . . . . .      . . ..........        . . ..........        . . . . . . . . . 3-19 3.2.2 Accident Se que nce Develop m ent . . . . .                  . . ..........        . . ..........        . . . . . . . . . . 3-20 3.2.2.1 Assum ptions and Limitations . . .              . . ..........        . . ..........        . . . . . . . . . 3-20 3.2.2.2 Products . . . . . . . . . . . . . . . . . .    . . ..........        . . ..........        . . . . . . . . . 3-20 3.2.2.3 Task Activities . . . . . . . . . . . . . .    . . ..........        . . ..........        . . . . . . . . . . 3-21 3.2.2.4 Task Interfaces . . . . . . . . . . . . .      . . ..........        . . ..........        . . . . . . . . . . 3-32 3.2.2.5 References . . . . . . . . . . . . . . . .      . . ..........        . . ..........        . . . . . . . . . 3-33 3.2.3 Sys tem s A nalysis . . . . . . . . . . . . . . . . . .      . . ..........        . . ..........        . . . . . . . . . . 3-34 3.2.3.1 Assum ptions and Limitations . . .              . . ..........        . . ..........        . . . . . . . . . 3-34 3.2.3.2 Products . . . . . . . . . . . . . . . . . .    . . ..........        . . ..........        . . . . . . . . . 3-34 3.2.3.3 Analytical Tasks . . . . . . . . . . . . .      . . ..........        . . ..........        . . . . . . . . . . 3-35 3.2.3.4 Task Interfaces . . . . . . . . . . . . .      . . ..........        . . ..........        . . . . . . . . . . 3-54 3.2.3.5 References . . . . . . . . . . . . . . . .      . . ..........        . . ..........        . . . . . . . . . 3-54 3.2.4 Data Analysis . . . . . . . . . . . . . . . . . . . . .      . . ..........        . . ..........        . . . . . . . . . . 3-55 3.2.4.1 Assum ptions and Limitations . . .              . . ..........        . . ..........        . . . . . . . . . 3-55 3.2.4.2 Products . . . . . . . . . . . . . . . . . .    . . ..........        . . ..........        . . . . . . . . . 3-55 3.2.4.3 Task Activities . . . . . . . . . . . . . .    . . ..........        . . ..........        . . . . . . . . . . 3-56 vii
 
TABLE OF CONTENTS (Continued)
Page 3.2.4.4 Task Interfaces . . . . . . . . . . . . . . .    . . . .........      . . . .........        . . . . . . . . 3-68 3.2.4.5 References . . . . . . . . . . . . . . . . . .  . . . .........      . . . .........        . . . . . . . 3-69 3.2.5  Hum an Re liability An alysis . . . . . . . . . . . . .  . . . .........      . . . .........        . . . . . . . 3-70 3.2.5.1 Assum ptions and Limitations . . . . .          . . . .........      . . . .........        . . . . . . . 3-70 3.2.5.2 Products . . . . . . . . . . . . . . . . . . . . . . . .........      . . . .........        . . . . . . . 3-72 3.2.5.3 Task Activities . . . . . . . . . . . . . . . .  . . . .........      . . . .........        . . . . . . . . 3-72 3.2.5.4 Task Interfaces . . . . . . . . . . . . . . .    . . . .........      . . . .........        . . . . . . . . 3-74 3.2.5.5 References . . . . . . . . . . . . . . . . . .  . . . .........      . . . .........        . . . . . . . 3-75 3.2.6  Quantification and Results . . . . . . . . . . . . .    . . . .........      . . . .........        . . . . . . . . 3-79 3.2.6.1 Assumption and Limitations . . . .              . . . .........      . . . .........        . . . . . . . . 3-79 3.2.6.2 Products . . . . . . . . . . . . . . . . . . .  . . . .........      . . . .........        . . . . . . . . 3-80 3.2.6.3 Task Activities . . . . . . . . . . . . . . .    . . . .........      . . . .........        . . . . . . . . 3-80 3.2.6.4 Task Interfaces . . . . . . . . . . . . . .      . . . .........      . . . .........        . . . . . . . . 3-87 3.2.6.5 References . . . . . . . . . . . . . . . . .    . . . .........      . . . .........        . . . . . . . . 3-88 3.3 Level 2 Analysis (Probabilistic Accident Progression and Source Term Analysis) . .                                . . . . . . 3-89 3.3.1 Plant Dam age State Determination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          . . . . . 3-92 3.3.1.1 Assum ptions and Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          . . . . . 3-92 3.3.1.2 Products . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-92 3.3.1.3 Analytical Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  . . . . . . 3-92 3.3.1.4 Task Interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .    . . . . . . 3-95 3.3.1.5 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  . . . . . 3-95 3.3.2 Assessing Containment Challenges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .              . . . . . . 3-95 3.3.2.1 Assum ptions and Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          . . . . . 3-95 3.3.2.2 Products . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-96 3.3.2.3 Analytical Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  . . . . . . 3-97 3.3.2.4 Task Interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .    . . . . . 3-100 3.3.2.5 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  . . . . 3-100 3.3.3 Containment Performance Characterization . . . . . . . . . . . . . . . . . . . . . . . . .                  . . . . . 3-101 3.3.3.1 Assum ptions and Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          . . . . 3-101 3.3.3.2 Products . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-101 3.3.3.3 Analytical Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  . . . . . 3-102 3.3.3.4 Task Interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .    . . . . . 3-103 3.3.3.5 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  . . . . 3-103 3.3.4 Containment Probabilistic Characterization . . . . . . . . . . . . . . . . . . . . . . . . . .              . . . . . 3-104 3.3.4.1 Assum ptions and Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          . . . . 3-104 3.3.4.2 Products . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-104 3.3.4.3 Analytical Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  . . . . . 3-104 3.3.4.4 Task Interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .    . . . . . 3-107 3.3.4.5 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  . . . . 3-107 3.3.5 Radionuclide Release Characterization . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            . . . . . 3-107 3.3.5.1 Assum ptions and Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          . . . . 3-107 3.3.5.2 Products . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-108 3.3.5.3 Analytical Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  . . . . . 3-108 3.3.5.4 Task Interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .    . . . . . 3-113 3.3.5.5 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  . . . . 3-114 viii
 
TABLE OF CONTENTS (Continued)
Page 3.4 Level 3 Analysis (Conseq uence Analysis and Integrated Risk A ssess m ent)                                    ........        . . . 3-114 3.4.1  Assum ption and Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            . ........        . . . 3-114 3.4.2  Products . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........        . . . 3-114 3.4.3  Analytical Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .    . ........        . . . 3-115 3.4.4  Task Interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .    . ........        . . . 3-117 3.4.5  References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  . ........        . . . 3-118 3.5 Flood Analysis . . . . . . . . . . . . . . . . . . . .  . . . .........      . . . .........        . . . .........        . . . 3-119 3.5.1  Assum ption and Limitations . . . .              . . . .........      . . . .........        . . . .........        . . . 3-119 3.5.2  Products . . . . . . . . . . . . . . . . . . .  . . . .........      . . . .........        . . . .........        . . . 3-119 3.5.3  Analytical Tasks . . . . . . . . . . . . .      . . . .........      . . . .........        . . . .........        . . . 3-119 3.5.4  Task Interfaces . . . . . . . . . . . . . .      . . . .........      . . . .........        . . . .........        . . . 3-125 3.5.5  References . . . . . . . . . . . . . . . . .    . . . .........      . . . .........        . . . .........        . . . 3-125 3.6 Fire Analysis . . . . . . . . . . . . . . . . . . . . . . . ..........        . . ..........          . . ..........          . . . 3-125 3.6.1 Assum ption and Limitations . . . .              . . ..........        . . ..........          . . ..........          . . . 3-126 3.6.2 Products . . . . . . . . . . . . . . . . . . .    . . ..........        . . ..........          . . ..........          . . . 3-126 3.6.3 Analytical Tasks . . . . . . . . . . . . .        . . ..........        . . ..........          . . ..........          . . . 3-126 3.6.4 Task Interfaces . . . . . . . . . . . . . .      . . ..........        . . ..........          . . ..........          . . . 3-134 3.6.5 References . . . . . . . . . . . . . . . . .      . . ..........        . . ..........          . . ..........          . . . 3-134 3.7 Seismic Analysis . . . . . . . . . . . . . . . . . .    . . . . ........      . . . . ........        . . . . ........        . . . 3-134 3.7.1 Assum ption and Limitations . . . .              . . . . ........      . . . . ........        . . . . ........        . . . 3-134 3.7.2 Products . . . . . . . . . . . . . . . . . . .    . . . . ........      . . . . ........        . . . . ........        . . . 3-135 3.7.3 Analytical Tasks . . . . . . . . . . . . .        . . . . ........      . . . . ........        . . . . ........        . . . 3-135 3.7.4 Task Interfaces . . . . . . . . . . . . . .      . . . . ........      . . . . ........        . . . . ........        . . . 3-139 3.7.5 References . . . . . . . . . . . . . . . . .      . . . . ........      . . . . ........        . . . . ........        . . . 3-139
: 4. DOCUMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4.1 Docum entation in Support of Reporting/Com munication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4.2 Docum entatio n in Support of Traceability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2 APPENDIX A    Recomm ended Supplemental CCF Generic Estimates for Kalinin PRA Based on E xpe rience in the U.S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1 APPENDIX B    Simplified Level 2 Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-1 APPENDIX C    Example Consideration of a Flood Scenario in a PRA                              . . . . . . . . . . . . . . . . . . . . . . . C-1 APPENDIX D    Example Consideration of a Fire Scenario in a PRA . . . . . . . . . . . . . . . . . . . . . . . . . D-1 ix
 
LIST OF FIGURES Figure No.                                                                                                                                  Page 1.1    The six components comprising a PRA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2 3.1    Master logic diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17 3.2    Exam ple of dependency matrix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-36 3.3    Exam ple of fault tree for backup cooling system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-38 3.4    Exam ple fault tree for inside spray recirculation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-39 3.5    Simple example for CCF analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-66 3.6    Exam ple of a decision tree for performance shaping factors . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-78 3.7    Relationship among the major parts of a Level 2 PRA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-89 3.8    Conditional probability of containment failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-91 3.9    Probab ility density functions for containme nt peak pre ssure (P c) and failure pressure (P f) . . . 3-107 3.10  Exam ple of simplified radionuclide release rates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-111 x
 
LIST OF TABLES Table No.                                                                                                                                      Page 2-1    Technical elements of a PRA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3 2-2    Summ ary of technical characteristics and attributes of a PRA . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9 3-1    Technical elements of a PRA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1 3-2    Plant information needed to perform a Level 1 internal event PRA                              . . . . . . . . . . . . . . . . . . . . . . 3-4 3-3    Generic information from plants of same/similar design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3-4    Cross reference of PRA tasks and plant information needed . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-6 3-5    Information needed for internal fire analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7 3-6    Information needed for internal flood analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7 3-7    Information needed for seismic analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8 3-8    Format for failure modes and effects analysis of key support systems . . . . . . . . . . . . . . . . . . . 3-14 3-9    Fo rm at for abnorm al operating instructio n re view s um m ary . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-14 3-10  Generic list of initiating events for VVER-1000 reactors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15 3-11  Safety functions identified in a recent PW R PRA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-25 3-12  Eq uipm ent hazard susceptib ility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-47 3-13  Ha zards ass ociated w ith equ ipm ent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-48 3-14  Illustration of a typical scenario table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-51 3-15  Typical hazard mitigation types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-53 3-16  The reliability formulation for the various contributors to the unavailability of a stan dby com pon ent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-61 3-17  Exam ple of performance shaping factors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-76 3-18  Exam ple attributes for grouping accident sequence cutsets . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-93 3-19  Severe accident phenomena . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-99 3-20  Exam ple plant design/operational parameters to be compared to demonstrate sim ilarity for use as surrogate analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-100 3-21  Radionuclide grouping scheme used in a Level 2 PRA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-110 3-22  Areas of key radionuclide source term uncertainties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-113 4-1    Do cum enta tion for the K alinin PR A projec t          . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 xi
 
ACKNOWLEDGMENTS The following organizations and individuals collaborated in performing the PRA for the Kalinin NPS, Unit 1:
U.S. Nuclear Regulatory Commission (NRC)
Charles Ader                                              John Lane Mark Cunningham                                          Scott New berry Mary Drouin                                              Them is Speis Thom as King                                              Andrew Szukiewicz NR C C ontracto rs Moham med Ali Azarm, Brookhaven National                  Mark Leonard, Dycoda Laboratory (BNL)                                          Hossein Nourbakhsh, BNL Dennis Bley, Buttonwood Consulting Inc.                    Robe rt Kennedy, RPK Structural Mechanics Tsong-Lun Chu, BNL                                        Consulting David Diamond, BNL                                        Robert Campbell, EQE International Inc.
Ted Ginsberg, BNL                                          Yang Park, BNL David Johnson, PLG Inc.                                    Trevor Pratt, BNL John Lehner, BNL                                          Jimin Xu, BNL Federal Nu clea r and R adiation Safety Auth ority of th e Russian Fed eration (GAN ), now the Federal Env ironm enta l, Indus trial and Nu clear Supervision Se rvice o f Ru ssia (R ostechn adz or)
Mikhail Mirochnitchenko                                  Alexandr Matveev Alexandr Gutsalov Scienc e and Eng ineering C enter for N uclear an d Ra diation Sa fety Irina Andreeva                                            Dm itri Noskov Tatiana Be rg                                              Gennadi Sam ok hin Valentina Bredova                                          Eugene Shubeiko Boris Gordon,                                              Vyacheslav Soldatov Irina Ioudina                                              Se rgei Volk ovitsk iy Artour Lioubarski                                          Elena Zhu kova Kalinin Nuclear Power Station Grigori Aleshin                                            Eugene Mironenko Oleg Bogatov                                              Maxim Robotaev Experimental and Design Office Gidropress Viatcheslav Kudriavtsev                                    Vla dim ir Shein Va leri Siriapin Nizhn y No vgoro d Project Ins titute Atom energ opro jekt Ludm ila Eltsova                                          Valeri Senoedov Vladimir Kats                                              Ale xander Yashkin Svetlana Petrunina Rosenergoatom Consortium Vladimir Khlebtsevich xii
 
ACRONYMS ACRS  Advisory Comm ittee on Reactor Safeguards ANS  Am erican Nuclear Society AO Is Abnormal Operating Instructions BE    Basic Event BNL  Brook haven N ational Laboratory CAR  Co rrective Ac tion R epo rts CCF  Com m on-Ca use Fa ilure CCI  Core-Concrete Interaction CDF  Core Dam age Frequency CET  Containment Event Tree DCH  Direct Containment Heating DOE  U.S. Department of Energy DRR  Docum ent Review Records EFC  Error-Forcing Context EPRI  Elec tric Power Resea rch Institute ESD  Event Sequence Diagram ET    Event Tree FT    Fault Tree F-V  Fu ss ell-V esely GAN  Federal Nuclear and Radiation Safety Authority of the Russian Federation HFE  Hum an Failure Event HPI  High-Pressure Injection HRA  Hum an Re liability An alysis IAEA  International Atomic Energy Agency IE    Initiating Event INEL  Idaho Na tional Engineering Laboratory IMTS  Information Management and Tracking System IRRAS Integrated Reliability and Risk Analysis System KNPS  Kalinin Nuclear Power Station LOCA  Loss-of-Coolant Accident MOV  Motor-O perated Valve NRC  U.S. Nuclear Regulatory Comm ission xiii
 
ACRONYMS (Continued)
PCA  Probabilistic Consequence Assessment PDS  Plant Dam age State PQASC Project Q uality Ass uran ce S tartup Check lists PRA  Probabilistic Risk Assessment PSF  Performance Shaping Factor PW R  Pressurized W ater Reactor QA    Quality Assurance QAR  Qu ality Assuran ce A udit R epo rts QHO  Qua ntitative Health Objective R.F. Russian Federation RAW  Risk A chievem ent W orth RCS  Reactor Coolant System RHR  Residual Heat Removal RRW  Risk R edu ction W orth SG    Steam Generator SGTR  Steam Gen erator Tube Rupture SLIM  Success Likelihood Index Method SSC  System s, Stru cture s, and Com pon ents SSMRP Seismic Safety Margins Research Program TRR  Te chn ical Review Reports xiv
: 1. INTRODUCTION 1.1        Background                                      useful to PRA practitioners in other countries, in particular those with VVER plants. For the Kalinin PRA these guides complemented other forms of At the Lisbon Conference on Assistance to the technical assistance provided by the NRC--nam ely, Nuclear Safety Initiative, held in May 1992, it was classroom training and works hops. Therefore, it agreed that special efforts should be undertaken to must be recognized that the guides alone will not improve the safety of the nuclear power plants provide the assistance needed to successfully designed and built by the former Soviet Union. As com plete a PRA for an organization that is relying part of these efforts, the U.S. Department of State, on outside assistance.
together with the Agency for International Development (AID), requested that the U.S.
Nuclear Re gulato ry Comm ission (NRC) and the            1.3      Scope Federal Nuclear and Radiation Safety Authority of the Russian Federation (GAN ) work togeth er to            The scope of this guide is a full-scope PRA . There begin the applicatio n of PRA te chnology to Soviet        are a number of major components that comprise designed plants. As a result, the NRC and GAN              the scop e of a PR A as illustrated in Figu re 1.1 .
agreed to work togeth er to carry ou t a probabilistic risk assess m ent (PRA) of a VV ER -1000 re actor in      1.      It is necessary to identify all potential risks the R uss ian Fede ration (R.F .).                                  and decide on how m any of these will be includ ed in the PR A.
Unit 1 at the Kalinin Nuclear Power Station (KNPS) was chosen for the PRA and the effort was carried          2.      It is also nec ess ary to determine the extent out under the auspices of GAN with the assistance                  of the population exposed to the risks of several other Russian organizations.2 The                        (e.g., hea lth effects to the plant personnel procedu re guides in this document were written to                  or the surrounding population) and the advance the PRA which is intended to serve as a                    population to be considered in the PRA.
demonstration of the PR A process and its utility in the reg ulatory process and in plant operations.
Furthermore, it is expected that the overall project      3.      Acciden ts can occur while the plant is at will also advance the use of PRA methods and                        full power, low power, or during a results in the regulation of nuclear power plants of                shutdown condition. The plant operating VVER design not only in the R.F. but also in other                  states to be considered in the PRA should, countries with such reactors.                                      there fore, be clearly identified.
1.2        Objectives                                      4.      The type of possible events that can initiate an accident also needs to be defined. Initiating events internal to the In ord er to carry out the PR A for KN PS Un it 1, it plant usually include transients, loss-of-was decided that the methodology for doing a PRA coolant accidents (LOCAs), fires, and should be defined and explained in a set of guides.
floods. Events external to the plant The writing of the guides would help assure that include seismic events, high wind, and the PRA would be done according to an others. Evaluation of sabota ge events is inte rn atio na lly acc epta ble a n d c o n sistent not currently included in a full-scope PRA.
framework. After individual tasks were completed the guides could then be used to help in the review
: 5.      A complete PRA involves three sequential of that work.
analytical parts or levels of risk as shown in Figure 1.1:
The first draft of the guides was used for the Ka linin PR A and now th is fin al repo rt should be 2
In addition to GAN, the following organizations were involved: GANs Scientific and Engineering Center for Nuclear and Radiation Safety, Kalinin Nuclear Power Station, the Experimental and Design Office Gidropress, Nizhny Novgorod Project Institute Atomenergoproect, and Rosenergoatom Consortium.
1-1
: 1. Introduction Figure 1.1 The six components comprising a PRA 1-2
: 1. Introduction
* Level 1 - involves the identification        (e.g., system m odeling), minimal guidance and and quantification of the sequences of        appropriate references would be provided.
events leading to core damage; PRA - Assumptions and Limitations
* Level 2 - involves the evaluation and quantification of the mechanisms,            The following assu m ptions and limitations are amo u n ts , a n d p ro babi li ti es of      generally found in a PRA; regardless of its scope subsequent rad ioactive m ate rial            or analytical approach:
releases from the containment; and
* The plant is operating within its regulatory
* Level 3 - involves the evaluation and                  requirements.
qu a n tific a tio n o f th e resu ltin g consequences to both the public and
* The design and construction of the plant the environm ent. C ons equ enc es to                  are adequate and satisfy the established plant personnel are usually not                        des ign criteria for th e plan t.
included in a Level 3 PRA.
* Plant aging effects are not modeled; that The procedure guides contained in this report do                    is, constan t equipment failure rates are not cover all of the items discussed above and                      assumed.
shown in Figu re 1.1 . The gu idance is limited to acc idents involving only the reactor core and that
* The PRA is calculated for an "average" occur while the plant is operating at full power.                    plant configuration . The plant c an be in Initiating events internal and external to the plant                many different configurations (especially are considered and included in the scope of this                    during shutdown) for short periods of tim e report. Guidanc e is also provided for all three                    and it is not practical to calculate the risk analytical levels. However, the Level 3 PRA                          from all of the potential configurations.
guidance is limited to offsite consequences.                        Instead, the average plant risk is calculated using test and maintenance 1.4      Limitations              and    General                  outage events in the PRA mode ls to represent average unavailabilities of Comments                                                  systems (or portions of systems). The average system unavailabilities reflect the PRA - Guides                                                        availability of the systems during all the d i ff e r e n t c o n f ig u r a ti o n s a c t u a l l y It was assumed that the team carrying out the                        experienced in the past operation of the PRA would be familiar with the guides developed                      plant. The actual test and maintenance by the International Atomic Energy Agency                            unavailabilities for the plant systems thus (IAEA,1992 and IAEA,1995) for carrying out                          must be calculate d using plant-specific Level 1 and Level 2 PRAs for internal events. The                    ope rational data .
IAEA documents represent inte rn atio na lly acceptable approaches. The ne w gu ides were to improv e on the existing guide s by: (1) taking into 1.5      References account rece nt work in the field, (2) considering Drouin, M. T., F. T. Harper, and A. L. Cam p, special problems that might be specifically present Analysis of Core Damage Frequency from for the VVER experience, and (3) improving upon Internal Events: Metho dology, Volum e 1, the guidance already provided. The idea was not NUREG /CR-4550/1, Sandia National Laboratories, to duplicate the existing guidance found in the September 1987.
IAEA document or the material in other guides that have bee n pro duc ed b y the NRC , e.g., NRC IAEA, Procedu res for Conductin g Probabilistic (1981), NRC (1996) and Drouin (1987). For Safety Ass ess m ents of N uclear Powe r Plan ts sub jects not we ll documented in the open literature (Level 2), Safety Series No. 50-P-8, International (e.g., the app roac h tak en fo r hum an re liability Atomic Energy Agency, 1995.
analysis), detailed guidance would be given; for tasks where a firm understanding was already well established and docum entatio n freely available 1-3
: 1. Introduction IAEA, Procedures for Co nducting Probabilistic Safety Ass ess m ents of N uclear Powe r Plan ts (Level 1), Safety Series No. 50-P-4, International Atomic Energy Agency, 1992.
NRC, Individual Plant Examination Program:
Perspectives on Reactor Safety and Plant Perform ance , NU REG -1560, U.S. Nuclear Regulatory Com mission, 1996.
NRC, PRA Procedures Guide - A Guide to the Performance of Probabilistic Risk Assessm ents for Nuclear Power Plants, NUREG/CR-2300, U.S.
Nuclear Regulatory Com mission, September 1981.
1-4
: 2. APPROACH 2.1      Scope of a PRA                                  radionuclides are considered. There are three possible sources of radionuclide release:
The scope and quality of a P RA are ke y in determ ining the role PRA results can have in the
* Reac tor Core decision-making regu latory ac tivity. This section
* Spent Fuel Pool relies heavily on work reported in SEC Y-00-0162
* Fuel Storage (NRC, 2000). T he scope of a P RA is defined by the following characteristics:
The population that could be exposed to the
: 1. Degree of coverage of the potential hazards hazard include on-site workers and mem bers of the population in the vicinity of the plant.              The
: 2. Degree of coverage of the population exposed consequences of an accidental release of to the hazard radioactive material from a nuclear power plant can be expressed in several forms including impacts on
: 3. Degree of coverage of plant operating states hum an h ealth, the en vironm ent, or eco nom ics.
(POSs) that define the plant's operating mode of con cern: from full-pow er, to low -pow er, to Plant operating states (POSs) are used to shutdown modes of operation.
subdivide the plant operating cycle into unique states such that the plant response can be
: 4. Degree of coverage of initiating events, either assumed to be the same for all subsequent internal or external to the plant boundary, that a c c i d e n t initiating e v e n t s . O p e r a t io n a l cause off-normal conditions.
characteristics (such as reactor pow er level; in-vessel temperature, pressure, and coolant level;
: 5. Level of characterization of risk:
equipment operability; and changes in decay heat load or plant conditions that allow new success
: a. Level 1 PRA that estimates the CDF criteria) are examined to identify those im porta nt to (given an event that challenges plant defining plant operational states. The important operation occurs ).
characteristics are used to define the states and the fraction of time spent in each state is estimated
: b. Level 2 PRA that estimates the using plant specific in formation. The risk containment failure and radionuclide perspective should be based on the total risk release frequencies (given a core damage state occurs).                                  connected with the operation of the reactor which includes not only full power operation, but low
: c. Level 3 PRA that estim ates the offsite          power and shutdo wn conditions. T herefore, to g ain consequences from a re lease, e.g ., ea rly      the m axim um benefit from a PR A, the model and latent cancer fatalities (given a            should address all modes of operation.
radionuc lide relea se o ccu rs).
Initiating events are e vents that have the ability to NRC Regulatory Guide 1.200 (NRC, 2004)                    challenge the condition of the plant. T hes e events describes an approach for determining that the            include failure of equipment from either "internal quality of a PRA is adequate and so provide                plant causes" such as hardware faults, operator confidence in its res ults .        This guidance is      actions, floods or fires, or "external plant causes" consistent with existing NRC PRA po licy, a nd it          suc h as seism ic or high winds.
reflec ts on-going work by U.S. standard-setting and nuclear industry organizations.                            The risk perspective should be based on the total risk connected with the operation of the reactor Hazards cover a w ide ran ge of e vents that co uld        which includes events from both internal and poten tially cause damage and health effects. For          external sources. Therefore, to gain the maximum the purpose of perform ing a PRA of a NPP the              benefit from a PR A, the m ode l shou ld add ress bo th hazards considered are those materials located on          internal and external initiating events.
the site that if released could pote ntia lly contam inate the enviro nm ent and cause health            The risk characterization used in risk-informed effects to the o n-site and off-s ite pop ulation.        applications are the core damage frequency (CDF)
Generally hazards resulting from the release of            and hea lth effects (to the surrounding po pulation);
2-1
: 2. Approach therefore, to provide the risk perspective for use in      all of the technical elements, it is discussed first.
decision-making, a Level 1, 2, and 3 PRA is                Docum entation is discussed last because all of the required.                                                  tech nical elem ents provide input this elem ent.
2.2        Scope of the Guides                              The guidelines for performing the technical elem ents for the above defined scope are provided in Ch apte r 3.
An essential part of the PRA process is having confidence in the PRA results such that they can Plant Familiarization be used in decision making. An independent peer review of the PRA can provide confidence in the Before the tec hnical ana lysis can begin, it is results. Therefore, the scope of the PRA guides impe rative that the analysis team becomes familiar includes guidance for both performing the technical with all aspects of the plant. The quality of work, and performing a peer review of the technical information gathered in this task and the m anner in work.
which it is managed is critical to the success of the entire analysis effort. This information gathering 2.2.1 Technical Guidance                                    process provides assurance that the possible core damage accident sequences are correctly defined As noted above, the scope of a PRA includes:                and realistically describe the possible plant responses.
* the  degree of coverage of S    potential hazards                                As this tas k provide s the bas ic plant inform ation S    population impacted                              needed to perform the analytical work the accuracy S    plant operating states                          of the information gathered is crucial. If inacc urate S    initiating events                                information is used (e.g., a plant drawing that is out of date because a pump has been removed from
* level of risk characterization.                        the system without the drawing being updated), the final resu lts are likely to inaccurately reflect the The first major item ab ove defines the scope of the        operational risk of the plant. It is, therefore, PRA, while the second major item defines the                important that all information be verified, and a analytical levels to be performed for the given            method for verifying plant information should be scope. For this pro ject, the PR A sc ope is limited to    developed e arly in the projec t.
the following:
The verification is aided by well organized and
* hazards including accidents that involve the          planned plant visits which in part look at the actual reactor core                                          plant components and layout and compares them
* offsite population                                    with written des cription s an d diag ram s.      The
* acc idents occurring while the plant is operating      verification is also aided by the establishm ent of a at full power                                          plant information data management and retrieval
* initiating events internal and external to the        system which is described below.
plant The plant m ay not be a fixe d entity. During (and The procedu re guides con tained in this report            after) the period of the PRA analysis, design and address this scope for all three analytical levels.        operational changes can occur at the p lant. Many may not have a risk or safety impa ct. However, The technical elements for each analytical level are        som e of the cha nge s co uld ha ve the potential to listed in the Table 2-1 and briefly described below.        significantly affect the final results of the analysis.
At the start of the proje ct a configuration freeze Plant Familiarization and Docum entation are not            date, i.e., the date after which plant changes will separate elements in of themselves but rather              not be included in the analysis, should be impact all of the technical elements as noted in            esta blishe d.
Table 2-1. As Plant Familiarization is required for 2-2
: 2. Approach Table 2-1    Technical elements of a PRA Scope/Level      Technical Elements (Note) of Analysis Risk Characterization (full power, internal events - transients and loss of coolant accidents)
Level 1
* Initia ting Event An alysis
* Pa ram ete r Estim atio n Analysis
* Su cc ess C riteria Analysis
* Hum an Re liability An alysis
* Ac cident Se quence Analysis
* Quantification Analysis
* Sys tem s A nalysis
* Interp retation of R esu lts Level 2
* Pla nt D am age State Analysis
* Quantification
* Ac cident Progress ion Analysis
* Interp retation of R esu lts
* So urce Term Analysis Level 3
* Data Collection
* Consequence Calculation
* Source Term Reduction
* Risk Integration Initiating Events (Other Events)
Internal
* Ide ntification Analysis
* Quantification Analysis Flood
* Evaluatio n Analysis Internal Fire
* Sc reening Analysis
* Fire D am age Analysis
* Fire Initiatio n Analysis
* Pla nt R esponse Analysis External
* Sc reening/Bo unding Analysis
* Fragility An alysis Eve nts
* Events A nalysis
* Level 1 Model Modification Risk Characterization                                            Success criteria a nalysis determines the minimum req uirem ents for each function (and Lev el 1 PR A                                                      ultimately the systems used to perform the functions) nee ded to prevent core dam age (or to The following provides a description of each of the                m itigate a release) given an initiating event occurs.
Level 1 technical elements.                                        The requirements defining the success criteria are based on acceptable engineering analyses that I n it ia t in g e v e nt a nalysis identifies and                represent the design and operation of the plant characterizes those ran dom internal events that                  under consideration. The c riteria neede d for a both challenge normal plant operation during power                function to be succe ssful is dependent on the or shutdow n conditions and re quire successful                    initiator and the conditions created by the initiator.
mitigation by plant equipm ent and p ersonn el to                  The code(s) used to perform the analyses for prevent core damage from occurring. Events that                    developing the success criteria are validated and have occurred at the plan t and those that have a                  verified for bo th technical integrity and suitab ility to reasonable probability of occurring are identified                assess plant conditions for the reactor pressure, and characterized. An unde rstanding of the nature                tem perature and flow range of interest, and of the events is performed such that a grouping of                accurately analyze the phe nom ena of interest.
the events into event classes, with the classes                    Calculations are performed by personnel qualified defined by sim ilarity of system and plant responses              to perform the types of analyses of interest and are (based on the success criteria), may be performed                  well trained in the use of the code (s).
to m anage the large num ber of poten tial events that can c hallenge the plan t.                                    A c c id e n t s e q u e n c e a n a l y s i s m od els ,
chronologically, the different possible progression of events (i.e., accident sequences) that can occur 2-3
: 2. Approach from the start of the initiating event to either              human failure e vents are bas ed o n plan t and successful mitigation or to core damage. The                  accident specific conditions, where applicable, accident sequences account for those systems and              including any dependencies among actions and operator actions that are used (and available) to              conditions.
m itigate the initiator based on the defined success criteria and plant operating procedures (e.g., plant          Quantification ana lysis provides an estimation of emergency and abnormal operating procedures                    the CDF given the design, operation and and as practiced in simulator exercises). The                  maintenance of the plant. This CDF is based on availability of a system includes consideration of            the summ ation of the estimated CDF from each the functional, phenomenological and operational              initiator class. If truncation of accident sequences dependencies and interfaces between and among                  and cutsets is applied, truncation limits are set so the different systems and operator actions during              that the overall model results are not impacted the course of the accident progression.                        significantly and that im porta nt accident sequences are not eliminated. Therefore, the truncation lim it S ys te m s ana lysis identifies the different                c an vary for each acci dent sequence.
combinations of failures that can preclude the                Consequently, the truncation value is selected so ability of the system to perform its function as              that the accident sequence CDF before and after defined by the success criteria. The model                    truncation only differs by less than one significant representing the various failure combinations                  figure.
includes, from an as-built and as-operated p e r s p e c ti v e, t h e sys t e m h a r d w a r e a nd    Interpretation of results entails examining and instrumentation (and their associated failure                  understanding the results of the PRA and modes) and the hum an failu re events th at w ould            identifying the important contributors sorted by prevent the system from performing its defined                initiating events, accident sequences, equipment function. The basic events representing equipment              failures and human errors. Methods such as and human failures are developed in sufficient                im p o r t an c e m e a s u r e c a l c u la t io n s ( e .g .,
detail in the m ode l to acc oun t for dependencies            Fuss el-Vesely, risk achievement, risk reduction, between and among the differe nt syste m s, and to            and Birnbaum) are used to identify the distinguish the specific equipment or human event              contributions of various events to the model (and its failure mechanism) that has a major impact            estimation of c ore dam age frequency for both on the system's ability to perform its function.              individual sequences and the m odel as a total.
Sources of uncertainty are identified and their Parameter estim ation an alys is quantifies the                impact on the res ults an alyzed. The sensitivity of frequencies of the identified initiators and quantifies        the model results to model boundary conditions the equipm ent failure pro babilities and equipmen t          and other ke y assum ptio ns is evaluated using unavailabilities of the modeled systems. The                  sen sitivity ana lyses to look at ke y assum ptions both estimation process includes a mechanism for                    individually or in logical combinations. The addressing uncertainties, has the ability to combine          combinations analyzed are chosen to fully account different sources of data in a coheren t man ner, and          for interactions among the variables.
represe nts the actual operating history and experience of the plant and applicable generic                Lev el 2 PR A experience as applicable.
The following provides a description of each of the Hum an reliability an alys is identifies and                  Level 2 technical elements.
quantifies the human failure events that can negatively impact normal or emergency plant                    Plant damage state an alys is groups sim ilar core operatio ns. The hum an failure events associated              damage scenarios res ulting from the full spectrum with norm al plant operatio n include those events            of core dam age acc idents identified in the Level 1 that leave the system (as defined by the success              analysis to allow a practical assessment of the criteria) in an unrevealed, unavailable state. The            severe accident progression and containment hum an failure events associated with emergency                response. The plant damage state analysis defines plant operatio n include those events th at, if not            the attributes of the core damage scenarios that performed, do not allow th e ne ede d system to                represent important boundary conditions to the function. Quantification of the probabilities of these        assessment of severe accidents progression and 2-4
: 2. Approach containment response that ultimately affect the            both individual sequences and the m odel as a tota l.
resulting source term. The attributes address the          Sources of uncertainty are identified and their dependencies between the containment systems              impact o the results analyzed. The sensitivity of the modeled in the Level 2 analysis w ith the core            mod el results to model boundary conditions and damage accident sequence models to fully account          other key assum ptions is evaluated using for mutual dependencies. Core damage scenarios            sen sitivity analyses to look at ke y assum ptions both with similar attributes are grouped together to allow      individually or in logical combinations. The for efficient evaluation of the Level 2 response.          combinations ana lyzed are cho sen to fully account for interactions among the variables.
Sev ere acc iden t pro gressio n analysis m odels the different series of events that challenge              Lev el 3 PR A containment integrity for the core damage scenarios represented in the plant damage states.          The following provides a description of each of the The accident progressions account for interactions        Level 3 technical elements.
among severe accident phenomena and system and human responses to identify credible                  Data Collection is a compilation of the containment failure modes including failure to            dem ographic and wea ther-related da ta needed to isolate the conta inm ent. The tim ing of major            predict how the radionuclide s will be d ispersed to accident events and the subsequent loadings                the enviro nm ent. Atm ospheric dispersion m odels produced on the containment are evaluated against          require the specification of local meteorology and the capacity of the containment to withstand the          terrain; deposition models require information potential challenges. T he conta inment performance        regarding frequen cy and inten sity of precipitation; during the severe accident is characterized by the        dose and health effects models require information timing (e.g., early versus late), size (e.g.,              regarding local dem ogra phics an d land use (i.e.,
catastrophic versus bypass), and location of any          crops g rown, dairy activity).
containment failures. The code(s ) used to perform the analysis are validated and verified for both          Sou rce Term Reduction groups severe accident technical integrity and suitability. Calculations are      progressions resulting from the full spectrum of performed by personnel qualified to perform the            severe accidents into a smaller number of types of analyses of interest and well trained in the      representative release categories to allow a use of the cod e(s).                                      practical assessment of the offsite consequences.
The reduction process identifies the attributes that Source te rm analysis characterizes th e                  represent important boundary conditions that radiological release to the environment resulting          ultim ate ly affect the offsite consequences.
from each severe a ccident sequ enc e lead ing to          Accident progressions with these similar attributes conta inment failure or bypass. The characterization      are grouped together to allow for efficient includes the time, elevation, and energy of the            evaluation of the Level 3 analysis.
release and the am ount, form, and size of the radioactive material that is released to the              Consequence Calculations provide a conditional environm ent.                                              estimation of the early and latent fatalities and the extent of land contamination that would be Quantification integrates the accident progression        expected follo win g severe acc idents .          This m odels and source term evaluation to provide              quantification does not reflect the actual risk estimates of the frequency of radionuclide releases        associated with operating the plant (this is that could be expected following the identified core      estimated in the risk integration task below), but damage accidents. This quantitative evaluation            determ inistica lly calculates for each of the reflec ts the different magnitudes and timing of          representative release categories the dispersal of radionuclide releases.                                    the rad ioactive plum e in the environment, the dose (and associated health effects) to the population Interpretation of results entails exa m ining re sults    and contamination of the surrounding land.
from importance m eas ure c alculations (e.g.,
Fu ss el-Ve sely, risk achievem ent, risk reduction,      Risk Integration com bines the res ults from all and Birnbaum ) to identify the contributions of            previous ana lyses (i.e., CDF, release frequency various events to the model estimation of risk for        and conditional fatalities) to com pute the selected 2-5
: 2. Approach measures of risk. For a given consequence                failure of doors or walls). Plant design features or measure, risk is obtained as the sum over all            operator actions that ha ve the ability to term inate postulated accidents of the produ ct of the              the flood are identified. Cred it given for flood frequency and consequence of the accident. The            isolation is justified. The susceptibility of each SSC methods for computing integrated risk are based          in a flo od are a to floo d-induced m echanism s is on combining the results of all constituent analyses      examined (e.g., submerge, spray, pipe whip, and of the PRA, from initiating event and core damage        jet impingement). Flood scenarios are developed frequencies calculate d in the Level 1 analysis          by exam ining the potential for propagation and through the set of plant damage states and                giving credit for flood mitigation. Flood scenarios containment event trees and associated source            can be eliminated on the basis of screen ing term frequencies estim ate d in the Level 2 analysis      criteria. The s creening criteria used are well to the conditional probabilities of the consequence      defined and justified.
m eas ures evaluated in the Level 3 ana lysis.
Quantification ana lysis provides an estimation of Oth er Even ts                                          the CD F o f the plant due to internal floods.
Flooding induced initiating events that represent The following provides a description of each of the      the design, operation and experience of the plant Other Events te chnical elements. In addressing          are identified and their frequencies quantified. The the abo ve elem ents , because of the nature and          Level 1 models are modified and the internal flood impact of internal flood and fire and external            accident sequen ces qua ntified: (1) m odify accident hazards, their attributes need to be discussed            sequence m ode ls to address flooding phenomena, separately. This is because flood, fire and external      (2) perform necessary calculations to determine hazards analyses have the ability to cause initiating    success criteria for flooding mitigation, (3) perform events but also have the capability to impact the        parameter estimation analysis to include flooding availability of m itigating system s. T herefore, in      as a failure m ode , (4) pe rform hum an re liability developing the PRA m odel, the impac t of flood, fire    analysis to account for PSFs due to flooding, and and external hazards needs to be considered in            (5) quantify internal flood accident sequence CDF.
each of the above techn ical elem ents. A sum m ary      Modification of the Level 1 models are performed of the desired attributes of an acceptable internal      consistent with the characteristics for Level 1 flood and fire and external hazards analyses is          elem ents for transients and LOCAs. In addition, provided below.                                          sources of uncertainty are identified and their impact o the results analyzed. The sensitivity of the Internal Floods                                          model res ults to m odel boundary conditions and other key assumptions is evaluated using Identification ana lysis identifies those plant areas    sen sitivity analyses to look at ke y assum ptions both where floo ding could pose significant risk. Flooding    individually or in logical combinations. The areas are defined on the basis of physical barriers,      combinations analyzed are chosen to fully account mitigation features, and propagation pathways. For        for interactions among the variables.
each flooding area, flood sources due to equipment (e.g., piping, valves, pumps), internal (e.g., tanks)    Internal Fires and external (e.g., rivers) water sources are identified along with the affected SSCs. Flooding        Screening ana lysis identifies fire areas whe re mechanism s are exam ined which include failure          fires could pose a significant risk. Fire areas which m odes of c o m p o n e n t s , h u m a n i n duced      are not risk significant can be "screened out" from mechanisms, and other water releasing events.            further con sideration in the P RA ana lysis. Both Flooding types (e.g., leak, rupture, spray) and flood    qualitative and quantitative screening criteria can sizes are determ ined. Plant walkdowns are                be used. The former address whether an performed to verify the accuracy of the information.      unsuppressed fire in the area poses a nuclear safety cha llenge; the latter are c om pare d ag ainst a Evaluation ana lysis identifies the potential            bounding asses sm ent of the fire-induce d core flooding scenarios for each flood source by              damage frequency for the area. The potential for identifying flood propagation paths of water from        fires involving multiple areas should be addressed.
the flood source to its accumulation point (e.g.,        Assum ptions used in the screening analysis should pipe and cab le pen etratio ns, doors, stairwells,        be verified through appropriate plant walkdowns.
2-6
: 2. Approach Key screening analysis assumptions and results,                availability of non-fire affected equipment (including e.g., the area-specific conditional core damage                control) and any re quired m anual actions. For fire probabilities (assum ing fire-induced loss of a ll              scenarios involving control room abandonm ent, the equipment in the area), should be documented.                  analysis should address the circuit interactions raised in NUREG/CR-5088, including the poss ibility Fire initiation ana lysis determines the frequency              of fire-induced damage prior to transfer to the and physical characte ristics of the detailed                  alternate shutdown panel(s). The hum an re liability (within-area) fire scenarios analyzed for the                  analysis of operator actions sho uld address fire unscreened fire area s. The a nalysis nee ds to                effects on operators (e.g., heat, smoke, loss of identify a range of scenarios which will be use d to            lighting, effect on instrumentation) and fire-specific represent all possible scenarios in the area. The              operational issues (e .g., fire response operating pos sibility of seismically-induced fires should be            procedures, training on these proc edu res, potential considered. The scenario frequencies should                    complications in coordinating activities). In addition, reflect plant-specific experience, and should be                sources of u ncertain ty are identified and their quantified in a manner that is cons istent w ith their          impact o the results analyzed. The sensitivity of the use in the subsequent fire dam age analysis                    model res ults to m odel boundary con ditions and (discussed below). The physical characterization of            other key assumptions is evaluated using each scenario should also be in term s th at w ill              sensitivity ana lyses to look at ke y assum ptions both suppo rt the fire damage analysis (especially with              individually or in logical combinations. The respect to fire mo deling).                                    combinations ana lyzed are cho sen to fully account for interactions among the variables.
Fire dam age an alys is determines the conditional prob ability that sets of potentially risk-significant          Externa l Events com pon ents (inc luding cables) will be dam aged in a particular m ode, given a specified fire scenario.            Screening and boun ding an alys is identifies The analysis needs to address components whose                  external events other than earthquake that may failure will cause a n initiating event, affect the            challenge plant operations and req uire successful plan t's ability to mitigate an initiating event, or affect    mitigation by plant equipment and pers onn el to poten tially risk significant equipment (e.g., through          prevent core dam age from occurring. The term suppression system actuation). Dam age from heat,              "screening out" is used here for the process smok e, and exposure to suppressants should be                  whereby an external event is excluded from further considered. If fire models are used to predict                  consideration in the PRA analysis. There are two fire-induced dam ag e , com partm ent-specific                  fundamental screening criteria embedded in the features (e.g., ve ntilation, geometry) and                    requirem ents here, as follows: An event can be target-specific features (e.g., cable location relative        screened out either (I) if it meets the certain design to the fire) should be addressed. Th e fire                    criteria, or (ii) if it can be show n using an analysis suppression analysis should account for the                    that the mean value of the design-basis ha zard sc enario-specific time required to detect, respond            used in the plant design is less than 10-5/year, and to, and extinguish the fire. The models and data                that the conditional core -dam age prob ability is less used to analyze fire growth, fire suppression, and              than 10-1, given the occurrence of the design-basis fire-induced component damage should be                        hazard. An external event that cannot be screened consistent with experience from actual nuclear                  out using either of these criteria is subjected to the power plant fire experience as well as experiments.            detailed-analysis.
Plant response analysis involves the modification              Event An alys is characterizes non-screened of appropriate plant transient and LOCA PRA                    external events and seismic events, generally, as models to determine the conditional core damage                frequencies of occurrence of different sizes of probability, given damage to the set(s) of                      events (e.g., earthquakes with various peak ground com pon ents defined in the fire damage analysis.              accelerations, hurricanes with various maximum All potentially significant fire-induced initiating            wind spe eds ) at the site. The ex ternal events are events, including su ch "s pecial" events as loss of            site specific and include both aleatory and plant support systems, and interactions between                epistemic uncertainties.
m ultiple nuclear units during a fire event, should be addressed. The analysis should address the 2-7
: 2. Approach Fragility An alys is characterizes conditional              the PRA against desired characteristics and probability of failure of important structures,              attributes, and needs to doc um ent the res ults components, and systems whose failure may lead              including both strengths and weaknesses of the to unaccepta ble dam age to the plant (e.g., core            PRA.
damage) given occurrence of an external event.
For important SSCs, the fragility analysis is rea listic    The team qualifications determ ine the cred ibility and plant-specific. The fragility analysis is based on      and acc epta bility of the pe er reviewe rs. The peer exten sive plant-walkdo wns reflec ting as -built,          reviewers sh ou ld not give any perception of a as-operated conditions.                                      conflict of interest, therefore, they should be independent of the PRA and not have performed Level 1 Model Modification assures that the                  any technical work on the PRA. The m embers of system models include all important external-event          the peer review team should have technical caused initiating events that can lead to core              expertise in the P RA elem ents they review damage or large early release. The system m odel            including experience in the specific methods that includes external-event induced SS C failures,              are utilized to pe rform the P RA elem ents . In non-external-event induced failures (random                  addition, knowledge of the specific plant design failures), and human errors. The system analysis is          and operatio n is essentia l. Fin ally, each mem ber of we ll coordinated with the fragility analysis and is        the peer review team should be k nowledgeable of based on plant walkdow ns. The results of the                the peer review process including the desired external event hazard analysis, fragility analysis,          characteristics and attributes used to assess the and system m odels are assem bled to estim ate              acc epta bility of the PR A.
frequencies of c ore dam age and larg e early release. Uncertainties in each step are propagated          The peer review process includes a documented through the process and displayed in the final              procedu re to direct the team in evaluating the results. The quantificatio n process is capable of          acc epta bility of a PRA. The review pro cess should conducting nec ess ary sensitivity analysis and to          compare the PRA against the desired PRA identify dominant sequences and contributors.                characteristics and attribute s, wh ich are listed in Table 2-2 below . In a ddition, to reviewing the Documentation                                              methods utilized in the PRA, the peer review also determines if the application of those methods Traceability and d efensibility provides the                were done correctly. The PRA m odels should be neces sary information such that the results can            compared against the plant design and procedures easily be reproduced and justified. The sources of          to validate that they reflect the as-built and information used in the PRA are both referenced              as-operated plant. Key assumptions should be and retrievable. The m etho dology used to perform          reviewed to determine if they are appropriate and each aspect of the work is described either through          if they have a significant impact on the PRA results.
documenting the actual process or through                    The PRA results should be checked for fidelity with reference to existing methodology documents.                the m odel structu re and also for consiste ncy with Assum ptions(1) m ade in performing the analyses            the results from PRAs for similar plants. Finally, the are identified and docum ente d along with th eir            peer review process should examine the justification to the e xten t that the context of the        procedures or guidelines in place for updating the assumption is understood. Th e results (e.g.,                PRA to reflect changes in plant design, operation, prod ucts and outcomes) from the various analyses            or experience.
are documented.
D o c u m e n t at io n pro vid es the ne c e s s a ry 2.2.2 Guidance for Peer Review                              information such that the peer review process and the findings are both traceable and defe nsible. A Process                                            description of the qualifications of the peer review team mem bers and the peer review process should A peer review process can be used to identify be documented. Th e res ults of the peer review for weaknesses in the PRA and the importance of the each technical element and the PRA update weaknesses to the confidence in the PRA results.
process should be described including those areas An acceptable peer review needs to be performed where the PRA do not meet or exceed the desired by qualified personnel, needs to be performed characteristics and attributes used in the review according to an established process that compares 2-8
: 2. Approach process. This includes an assessment of the                  Activities, SECY-00-0162, July 28, 2000.
importance of any identified deficiencies on the PRA results and potential uses and how these                  NRC, An Approach for Determining the Technical deficiencies were addressed and resolved.                    Adequacy of Probabilistic Risk Assessment Re sults for Risk-Inform ed Activities, Regu latory 2.3      References                                          Guide 1.200, issued for trial use, February 2004.
NRC, Addressing PRA Quality in Risk-Informing Table 2-2 Summary of technical characteristics and attributes of a PRA Element                        Technical Characteristics and Attributes Plant Familiarization
* identification of plant information sources to provide sufficient plant knowledge such that the PRA m odel represents the as-built and as-operated plant and reflects the actual opera ting history
* design and operational understanding confirmed by actual plant walkdow ns and interviews of ope rators Level 1 PR A (internal events -- transients and loss of coolant accidents (LO CAs ))
Initiating Event
* sufficiently detailed identification and c haracterization of initiators An alysis
* grouping of individual events according to plant response and m itigating re quirem ents
* proper screening of any individual or grouped initiating events Su cc ess C riteria
* based on best-estimate engineering analyses applicable to the An alysis                    actual plant design and operation
* codes developed, validate d, and verified in suffic ient detail
                                    - analyze the phenomena of interest
                                    - be applicable in the pressure, tem perature, and flow range o f interest Accident Sequence
* defined in terms of hardware, operator action, and timing Development                  requirements and desired end states (e.g., CD or PDSs)
An alysis
* includes necess ary and sufficient equipm ent (safety and non-safety) reasona bly expected to be used to mitigate initiators
* includes functional, phenomenological, and operational dependencies and interfaces Sys tem s A nalysis      models developed in sufficient detail to:
* reflect the as built, as operated plant including how it has perform ed during the plant history
* reflect the required success criteria for the systems to m itigate each identified accident sequence
* capture impact of dependencies, including support systems and hars h en vironm enta l imp acts
* include both active and passive components and failure modes that impact the function of the system
* includ e co m m on c aus e failure s, hum an e rrors , unavailability due to test and m ainten anc e, etc.
2-9
: 2. Approach Table 2-2    Summary of technical characteristics and attributes of a PRA (contd)
Element                          Technical Characteristics and Attributes Parameter Estimation
* estim atio n of pa ram ete rs associated with initiating event, ba sic An alysis                  event pro bab ility m ode ls, recovery action s, and un availability events that acco unt fo r plant-spe cific an d ge neric data
* consistent with component boundaries
* estim ation includes a cha racterization of the unc ertainty Hu m an R eliability
* identification and definition of the hum an failu re events th at w ould An alysis                  result in initiating events or pre- and po st-accident hum an failure events that wo uld im pac t the m itigation of initiating events
* qua ntification of the ass ociated hum an e rror proba bilities taking into account scenario (where applicable) and plant-specific factors and including appropriate dependencies both pre- and post-accident Quantification
* estimation of the CDF for modeled sequences that are not screened due to truncation, given as a mean value
* estimation of the accident sequence CDFs for each initiating event group
* truncation values set relative to the total plant CDF such that the frequency in not significantly impacted Interpretation of
* identification of the key contributors to CDF: initiating events, Re sults                    accident sequ ences , equipm ent failures and hum an errors
* identification of sources of uncertainty and their impact on the results
* understanding of the impact of the key assumptions* on the CDF and the identificatio n of the acc ident s equence and their contributors Level 2 PRA Plant Dam age State
* identification of the attributes of the core damage scenarios that An alysis                  influence severe accident progression, containment performance, and any subsequent radionuclide releases
* grouping of core damage scenarios with similar attributes into plant damage states
* carryover of rele vant inform atio n from Level 1 to Level 2 Severe Accident
* use of verified, validated codes by qualified trained users with an Progress ion Analysis      understanding of the code limitations and the means for addressing the limitations
* assessment of the credible severe accident phenomena via a structured process
* assessment of containment system performance including linkage with failure modes on non-containment systems
* establishment of the capacity of the containment to withstand severe a ccident environ m ents
* assessment of accident progression timing, including timing of loss of co ntainm ent fa ilure integ rity Quantification
* estimation of the frequency of different containment failure modes and resu lting radionuclide source terms 2-10
: 2. Approach Table 2-2    Summary of technical characteristics and attributes of a PRA (contd)
Element                        Technical Characteristics and Attributes Source Term
* assessment of radionuclide releases including appreciation of An alysis                  timing, location, amount and form of release
* grouping of radionuclide releases into smaller subset of representative source terms with emphasis on large early release (LER) and on large late release (LLR)
Interpretation of
* identification of the contributors to containment failure and resulting Re sults                    source term s
* identification of sources of uncertainty and their impact on the results
* understan ding of the im pact o f the k ey ass um ptio ns* on Level 2 results Level 3 Data Collection
* data regarding local meteorology and terrain, site demographics, and local land use represent current, plant-specific condition.
Source Term
* source terms used to calculate offsite consequences preserve the Reduction                  full rang e of e arly (m ech anistic) and late (s toch astic) hea lth effects that would result from actual Level 2 source terms.
Consequence
* variability in weath er addressed as m ajo r un certainty in Calculation                consequences Risk Integration
* integrates results of Level 1, 2 and 3 to compute various measures of risk.
* each of the three PRA Levels are linked together in a self-consistent and statistically rigorous m anner.
Inte rnal Flood Analysis Ide ntification Analysis
* sufficiently detailed identification and c haracterization of:
                            - flood areas and SSCs located within each area
                            - flood sources and flood mechanisms
                            - the type of wa ter release and cap acity
                            - the structures functioning as drains and sumps
* verification of the information through plant walkdowns Evaluatio n Analysis
* identification and evaluation of
                            - flood propagation paths
                            - flood mitigating plant design features and operator          actions
                            - the susceptibility of SSCs in each flood area to the          different types of floods
* elimination of flood scenarios uses well defined and justified sc reening criteria 2-11
: 2. Approach Table 2-2  Summary of technical characteristics and attributes of a PRA (contd)
Element                        Technical Characteristics and Attributes Quantification
* identification of flooding induced initiating events on the basis of a structured and systematic process
* estimation of flooding initiating event frequencies
* estimation of CDF for chosen flood sequences
* m odifica tion of the Level 1 m ode ls to ac cou nt for flooding effects including uncertainties Inte rnal Fire Analysis Sc reening Analysis
* all potentially risk-significant fire areas are identified and addressed
* all required mitigating components and their cables in each fire area are identified
* screening criteria are defined and justified
* necessary walkdowns are performed to confirm the screening decisions
* screening process and results are documented
* unscreened events areas are subjected to appropriate level of evaluations (including detailed fire PRA evaluations as described below) as needed Fire Initiation
* all potentially significant fire scenarios in each un screene d area are An alysis                  addressed
* fire scenario frequencies reflect plant-specific features
* fire scenario physical characteristics are defined
* bases are provided for scree ning fire initiators Fire Dam age
* damage to all potentially significant components is addressed; Analysis                  considers all potential component failure modes
* all potentially significant damage mechanisms are identified and addressed; damage criteria are specified
* analysis addresses scenario-specific factors affecting fire growth, suppression, and component damage
* m odels and da ta are consistent with experience from actual fire exp erience a s we ll as experim ents
* includ es e valua tion of prop aga tion of fire and fire effec ts (e.g .,
sm oke) be twee n fire com partm ents Plant Response
* all potentially significant fire-induced initiating events are addressed An alysis                  so that their bases are included in the model
* includes fire scenario impacts on core damage m itigation and containment systems including fire-induced failures
* analysis reflects plant-specific safe shutdown strategy
* potential circuit interactions which can interfere with safe shutdown are addressed
* hum an relia bility analysis addresses effe ct o f fire scenario-specific conditions on operator performance 2-12
: 2. Approach Table 2-2    Summary of technical characteristics and attributes of a PRA (contd)
Element                            Technical Characteristics and Attributes Quantification
* estimation of fire CDF for chosen fire scenarios
* identification of sources of uncertainty and their impact on the results
* understanding of the impact of the key assumptions* on the CDF
* all fire ris k-significant s equences are traceable and rep roducible Ex ternal Events A nalysis Screening and
* credible external events (natural and man-m ade) that may affect the Bo unding Analysis          site are addressed
* screening an d bound ing criteria are defined and results are documented
* necessary walkdowns are performed
* non-screened events are subjected to appropriate level of evaluations Event An alysis
* the event analysis is site and plant-specific
* the event analysis addresses uncertainties Fragility An alysis
* fragility estimates are plant-specific for important SSCs
* walkdow ns are con ducted to identify plant-unique conditions, failure modes, and as-built conditions.
Level 1 Model
* importa nt externa l event caused initiating eve nts that can lead to Modification                core damage and large early release are included
* external event related unique failures and failure mod es are incorporated
* equipm ent failures from other ca uses an d hum an errors are included. W hen necessary, human error data is modified to reflect unique circumstances related to the external event under consideration
* unique aspects of comm on causes, correlations, and dependencies are included
* the systems m odel reflects as-built, as-operated plant conditions
* the integration/quantification accounts for the uncertainties in each of the inputs (i.e., hazard, fragility, system m odeling) and final quantitative results such as CDF and LERF
* the integration/quantification accounts for all dependencies and correlations that affect the results Docum entation Traceability and
* The docum entation is sufficient to facilitate independent peer defens ibility              reviews
* The docum entation describes all of the important interim and final results, insights, and important sources of uncertainties
* W alkdown process and results are fully described
*Assumptions include those decisions and judgments that were made in the course of the analysis.
2-13
: 3. TECHNICAL ACTIVITIES This chapter provides the guidance for the                      The guides contain ed in this chapte r ad dress th is analytical tasks needed to perform the technical                scope for all three analytical levels.
ele m ents of the PR A for the scope defined in Chapter 2. This scope includes:                                  The technical elem ents for each analytical level are listed in Table 3-1 and their associated guides
* hazards involving reactor core accidents                    described below.
* offsite population
* acc idents occurring while the plant is operating          Plant Familiarization and documentation are not at full power                                              separa te elements in of themselves but rather
* initiating events internal and external to the              impact all of the tec hnical elem ents a s note d in plant                                                      Table 3-1. As plant fam iliarizatio n is req uired for all of the techn ical elem ents it is discusse d first.
Docum entation is discussed in Chapter 4.
Table 3-1    Technical elements of a PRA Scope/Level      Technical Elements (Note) of Analysis Risk Characterization (full power, internal events - transients and loss of coolant accidents)
Level 1
* Initia ting Event An alysis
* Pa ram ete r Estim atio n Analysis
* Su cc ess C riteria Analysis
* Hum an Re liability An alysis
* Ac cident Se quence Analysis
* Quantification Analysis
* Sys tem s A nalysis
* Interp retation of R esu lts Level 2
* Pla nt D am age State Analysis
* Quantification
* Ac cident Progress ion Analysis
* Interp retation of R esu lts
* So urce Term Analysis Level 3
* Data Collection
* Consequence Calculation
* Source Term Reduction
* Risk Integration Initiating Events (Other Events)
Internal
* Ide ntification Analysis
* Quantification Analysis Flood
* Evaluatio n Analysis Internal Fire
* Sc reening Analysis
* Fire D am age Analysis
* Fire Initiatio n Analysis
* Pla nt R esponse Analysis External
* Sc reening/Bo unding Analysis
* Fragility An alysis Eve nts
* Events A nalysis
* Level 1 Model Modification 3.1        Plant Familiarization                                information gathering process provides assurance that the poss ible core dam age acc ident sequences are correctly defined and rea listic ally describe the This section describes the Plant Familiarization possible plant responses.
An alysis task . Before the technical analysis can begin, it is imperative that the analysis team becomes fam iliar w ith all aspects of the plant. The          3.1.1 Assumptions and Limitations qua lity of information gathe red in this task and the manner in which it is managed is critical to the                This tas k p rovides the basic plant in formation success of the entire a nalysis effort.            This        needed to perform the analytical work. Hence, the 3-1
: 3. Technical Activities accuracy of the inform ation g athe red is cruc ial. If        incorporate them into the plant model after inaccurate information is used (e.g., a plant                  concurrence between the team leader and the drawing that is out of date because a pump has                  project sponsors. It should be noted, however, been removed from the system without the                        that in a typical plant, changes ranging from sm all drawing being upd ated ), the fina l results are like ly        to m ajor occ ur frequently. Consideratio n of all to inaccurately reflect the operational risk of the            wo uld be a m ajor distraction of the project team plant. It is, therefore, important that all information        and can impact project milestones.
be verified, and a method for verifying plant information should be developed early in the                    3.1.2 Products proje ct.
The current task provides significant inform ation to Verification is particularly important for VVER                all analytical tasks of the PRA. In addition, the task reactors because the information can come from                  will provide basic inform ation needed for the final several different sources. The team leader should              documentation. Specifically, the products for this establish an appropriate QA process so that the                task are provided below:
i n fo r m a t i o n d o e s p r o vi d e an a c c u r a te representation of the as-built condition and current
* A report documenting the outcome of the plant operation of the plant. N ote that this verificatio n is            visit is sent to th e various organizations. T his also part of an overall QA prog ram for the proje ct.                allows the utility personnel who have been queried to clarify any misunderstandings and The verificatio n is aided by well organized and                    provide traceability of the information received.
planned plant visits which in part look at the actual plant components and layout and compares them
* After the additional information is obtained with written descriptions and diagrams. The                          during the plant visit, the outputs of the verification is also aided by the establishment of a                preliminary plant analysis task should be plant information data managemen t and retrieval                    finalized to the extent possible before being system which is described below.                                    em ployed in sub seq uen t task s in the PR A.
The plant m ay not be a fixed entity. During (and
* The plant information gathering effort after) the period of the PRA analysis, design and                    continues throughout the PRA study so that a operational changes can occur at the plant. Many                    coherent PRA m odel is developed that reliably may not have a risk or safe ty im pact. Howe ver,                    reflec ts the plant design and operation.
som e of the changes could have the pote ntial to                    Requests for additional information and significantly affect the final res ults of the analysis.            additional plant visits focusing on specific At the start of the pro jec t, the team leader should                subjects is expected.
decide on a con figura tion freeze d ate, i.e., the date after which plan t change s will not be included in 3.1.3 Task Activities the analysis. Therefore, close comm unication must exist between the team leader and the plant In the plant familiarization process, a n staff m em ber respon sible for scheduling plant understanding of the plant is established, providing changes. Th is close coordination ensures that the the fou ndatio n fo r all s ubsequent tec hnical ana lysts are not dealing with a mov ing target in analyses and modeling activities. This process terms of plant configuration. The potential for the involves several activities summ arized below, and analysis to be outdated before completio n is subsequently discussed in m ore deta il.
reduced.
The second task, Obtain Analysis Information, Establishing an analysis freeze date is intend ed to involves obtaining specific information. Although facilitate the com pletion of the m odels in a tim ely this guide concentrates on the type of information m anner. Indeed, it is lik ely and desirable for plant needed for performing an internal event analysis, changes (ha rdwa re or p rocedural) to be identified preliminary information needed for conducting during the conduct of the PR A, p ossibly as a re sult internal fire, internal flood, and seism ic analyses is of some preliminary task-analysis findings. If a also listed. T his info rm atio n comes from several comm itment is made to implement these changes sou rces, including the plant.
in a timely manner, the PRA should then 3-2
: 3. Technical Activities The next task involves using the data to perform a          m ade to thes e diffe rent g roup s.
preliminary plant a nalysis to initiate preparation of other tasks of the PRA, followed by a plant visit          It is im portant to ens ure th at the m ost up-to-date (Task 4). The plant visit is scheduled to resolve          information is used in the study.              Before a questions, confirm and corroborate information              document is requested, it should be known how already rece ived, a nd o btain a dditional                often it is updated and whether portions of the information. The p rocess is iterative and the plant        document are out of date. Close com m unication visits selective as discussed in Task 4 Mo re visits        is essential between the PRA team leader and the may be necess ary for obtain ing additional                designated senior plant staff mem ber at the information found lacking as a result of the                information source for assuring that the requested ongoing analysis or as the program matures. For            plant information is up to date.
example, it would be m anpow er intensive and cost prohibitive to conduct during the first visit a spatial    Ge neric Inform ation fro m S imilar P lants interaction to assess likely fire scena rios before dominant accident sequen ces for internal events            Analyses performed for similar plants can also be have been appropriately quantified and evaluated.          very useful. It can enhance the completeness of the PRA m odel by providing supplemental Task 1 - Obtain Analysis Information                        information on: the reliability of similar plant components, potential accident initiators, potential Plant-Specific Information                                  accident scenarios, and common safety issues.
Three types of generic informa tion that can be Table 3-2 lists plant docum ents th at s hould conta in    considered useful for supplementing the PRA are information needed for conducting a Level 1 PRA.            listed in Table 3-3.
A brief description about each document and the relevant PRA information each m ay contain is also          Table 3-4 lists all the tasks required for conducting given in the table. Much of this information can be        an internal event analysis and cross references obta ined prior to any plant visit. Howe ver, before        each task with the needed information listed in the any specific docum ents are requested, the project          previous two tables.
team should be made aware of a ll the possible plant documents that may contain the information            Information Needed for Internal Fires, Internal indicated and then selectively request those                Floo ds, and S eism ic Events deemed m ost appro priate for the proje ct. In particular, a list of piping an d instrum enta tion        Table 3-5 lists the plant information needed for an diagrams sho uld be provided to the team and                internal fire analysis.1          Table 3-6 lists the copies be made available of those diagrams                  information needed to perform an internal flood considered most relevant by the team.                      analysis. Basically, plant-specific flood incident It is essential to have a senior mem ber of the plant staff act as a contact point for obtaining plant            1 information from each source.            This person          Note that in the U.S., information relevant to this table comes from the plant's implementation of the should: (1) be familiar with the process of regulatory requirements specified in Appendix R of acquiring the types of inform atio n listed in              10CFR50. The Appendix R submittal contains: the Table 3-2, (2) provide the indices for the                  definition of fire areas, including the fire protection docum ents and possibly give sample documents              equipment; safe shutdown analysis that assures that to the PRA team at the beginning of the                    a minimum set of plant systems and components are information gathering task , (3) be able to                available to shutdown the plant, given a postulated understand why the inform ation is needed, and              fire with a concurrent loss of offsite power; and (4) continue to serve as liaison throughout the            combustible loading analysis that identifies the proje ct. It is likely that several different            sources of combustibles, including transients and cables. For a fire PRA, in addition to the Appendix R organizations or g roups w ithin an org anization will submittal, plant-specific and generic fire incident data be aske d to provide informatio n or other suppo rt        and cable location and routing drawings are needed.
for the PRA. The idea behind requesting a "senior          The noted table summarizes the information needed m em ber" as a perm ane nt point of co ntac t is to        from those plants that do not have an Appendix R facilitate and expedite the requests for information        submittal or its equivalent.
3-3
: 3. Technical Activities Table 3-2    Plant information needed to perform a Level 1 internal event PRA Plant Document                                        Information Provided 1    Fina l Safe ty Ana lysis Repo rts          Ge neral description of the plant, system s, and design basis accidents submitted to the regulatory agency 2    System Descriptions, System                De tailed s ystem des cription s (po ssib ly used in opera tor trainin g),
Ma nuals, Eq uipme nt M anuals            opera ting envelope and success criteria (manufacturers) 3    Piping and Instrumentation Diagrams,      Schematics of systems showing piping specifications, System Flow Diagrams                      components, instrumentation sensors, and flow paths 4    Elementary Diagrams                        Co ntrol diagra ms for co mpone nts 5    Electrical One-line Diagrams              Sh ow ing b reak ers a nd c ompon ents that are con nec ted to differe nt electrical buses and motor control centers, contro l logic 6    Equipment Layout Drawings                  Sh ow ing loc ation of major compon ents in different p lant areas , to determine accessibility to areas of recovery and potential com mon ca use effects 7    Emergency Procedures and other            Accident scenario development, human reliability analysis, proc edu res th at he lp the ope rators    accident mitigation strategies for event tree development during an accident 8    Operating Procedures                      Full, low power and shutdown activities 9    Training Procedures for Mitigating        Ac cident sce nario developm ent, huma n reliability ana lysis Accide nts 10  Test and Maintenance Procedures for        Low power and shutdown activities, system availability, corrective Major Equipment, Surveillance              and preventive strategies Procedures 11  Maintenance Logs                          Ma inten anc e un ava ilability data, mea n-time -to-rep air, failure frequency 12  Licensee Event Reports                    Incident re ports that are requ ired to be s ubm itted to the reg ulato ry body, initiating event source book 13  Technical Specifications and Other        System model development, limiting condition of system Re gula tory Re quire ments                operation, allowed down times 14  Plant Incidents and Analysis Reports,      Description and analysis of incidents at the plant that may or may Scram Reports, Operator Logs              not be reported to the regulatory body, recurring problems 15  Piping Location and Routing Drawings      Routing of piping throughout the plant 16  An alyse s an d Experim ents Pertinen t to Documentation of experiments and thermal hydraulic analysis that the Determination of Mission Success      were performed to address safety or operational issues, and plant Crite ria                                  behavior in specific conditions 17  Fa ilure Mo de and E ffect Analysis        Detailed documentation of potential failure modes of equipment and their effect on the rest of the plant 18  Control Room Instrumentation and          Layou t of individual gauges, annunciators, and control switc hes in Control Layout Drawings                    the control room 19  Descriptions of Known Safety or            Potential failure modes and accident scenarios, level of detail of Regulatory Issues to Be Addressed          PRA model needed 3-4
: 3. Technical Activities Table 3-3    Generic information from plants of same/similar design Generic Information from Plants of                          Examples Same/Similar Design A PRAs                                  Novovoronezh PRA B Analysis of Exp erienced Events        IAEA-TECDO C-749 on Generic Initiating Events for PRA for VVER Reac tors C Com ponent F ailure Da ta A nalysis    IAEA-T EC DO C-4 78 o n Com pon ent R eliability Data Sources in PRA 3-5
: 3. Technical Activities Table 3-4    Cross reference of PRA tasks and plant information needed Plant Specific            Generic Information PRA Tasks                      Information/Documentation        for Plants of Similar Needed (Items from Table 3-1)      Design (Items from Table 3-2)
Familiarization                              All                                  All Sources of Radioactive Releases              1,2,6,19                            A,B,E,F Select Plant Operating States                1,2,8                                A Definition of Core Damage                    16                                  A,C Selection of Initiating Events                1,2,7,9,12,14,17,19                  A,B,E,F Definition of Safety Function                1,2,7,9,14,16,19                    A,B,C,E,F Function/System Relationship                  1,2,7,14,16,19                      A,B,E System Requirements                          1,2,3,4,5,6,7,13,14,16,17,19        A,B,C,E,F Grouping of Initiating Events                1,2,3,4,5,6,7,13,14,16,17,19        A,B,E Event Sequence Modeling                      1,2,6,7,9,12,14,16,19                A,B,C,E,F System Modeling                              1,2,3,4,5,6,7,13,14,16,17,19        A,B,D Human Performance Analysis                    1,2,6,7,9,12,14,16,18                A,B,E,F Qualitative Dependence Analysis              123456719                            A,B,E,F Impact of Physical Process on Logic Model    1,2,7,9,12,14,16,17,19              A,B,C,E,F Plant Damage State                            Information needed for preceding    A,C tasks that provide input to the task Analysis of Initiating Event Frequency        1,2,7,9,12,17,19                    A,B,E,F Component Reliability and Common Cause        10,11,12,19                          A,B,D,E,F Failure Assessment of Human Error Probabilities      1,2,6,7,9,12,14,16,18,19            A,B,E,F Accident Sequence Boolean Equations          1,2,3,4,5,6,7,13,16,17,19            A,E Initial Quantification of Accident Sequences  Information needed for preceding    A,D tasks that provide input to the task Final Quantification of Accident Sequences    Information needed for preceding    A,D tasks that provide input to the task Uncertainty Analysis                          Information needed for preceding    A,D tasks that provide input to the task Importance and Sensitivity Analyses          Information needed for preceding    A,E tasks that provide input to the task 3-6
: 3. Technical Activities Ta ble 3 -5  Info rm ation need ed for in tern al fire analysis Fire Area De finition - Areas sepa rated by 3-hour rated barriers Fire Barriers - Fire doors, fire walls, cable penetrations, cable tray insulations Loading of C om bustib les and T heir Physical and C om bustio n Properties - Ca bles, lubricating oil, paper, etc.
Cable Location, Separation, and Routing Drawings - Power cables and control cables Plant-Specific a nd G ene ric Fire Incide nts R epo rts Fire Detection Devices - Sm oke de tectors, heat sensors Fire Suppression Devices - Sprinklers, CO 2, halon system, fire hydrant, fire hose, fire extinguisher, deluge system Fire Contingency Plans - Emergency procedures in case of a fire.
Safe Shutdown Analysis - Analysis demonstrating that a fire postulated at a given location can be mitigated with the plant brought to a safe shutdown condition.
Breaker Coordination Study - Studies indicating that the sequencing of the breaker opening and closing during a postulated fire will not adversely affect the plants ability to mitigate the fire.
Ta ble 3 -6  Info rm ation need ed for in tern al floo d an alysis Potential Sources of Floods - Storage tanks, lakes, rivers, oceans, reservoirs, their location, elevation, and volume General Arrangement Drawings - Showing the plant site topography information and the proximity of plant structures to nearby flood sources Potential Path W ays Between the Sources of Flood and Plant Buildings - Piping, pipe tunnels, floor drains, d oors, dik es, ca ble tunnels Inte rconnectio ns betwe en different floors and buildings - Doors, dik es, floor dra ins, pipe tunnels, ca ble tun nels Plant Specific Flood Incident Descriptions and Analyses Em ergency Procedures for Floods (and procedures for responses to high sump levels) data, potential sources of flood, and pathways from            occurrences of seismic events for a range of the flood sources to plant equipment are needed.              ground-motion intensities .      A fragility analysis provides com ponent and structure fragilities that Table 3-7 lists the information needed to perform a            are used to calculate the likelihood that the seism ic event analysis. The information is needed            component or s tructu re will fa il, given a seism ic to determ ine the seism ic haza rds at the p lant site        event of a certain magnitude.
and the component fragilities. A hazard analysis provides curves that present the frequency of 3-7
: 3. Technical Activities Ta ble 3 -7    Info rm ation need ed for seism ic an alysis (a) Inform atio n fo r Perform ing Ha zard Analysis Type of Information                                        Desirable Information Seismicity around the
* Documents on historic earthquakes in a wide area surrounding the site region
* Documents on recent earthquake activities around the site
* Documents/references related to the siting of the plant
* References on the seismological studies for the region (e.g., magnitude, attenuation)
* Recorded ground motions (if not available, use U.S./European records for similar grounds)
Geological and ground
* Geological maps; wide area (1/100,000 - 1/200,000), vicinity (1/1,000 - 1/5,000),
survey (if the site is        and vertical geological cross-section map near the ocean, include
* Aerial photographs (if any) seabed survey)
* Topological surface survey (existence of lineaments/dislocations)
* References on the seismic geostructure around the region (seismotectonics)
* Survey on the active faults around the region (e.g., fault length, dislocation speed)
Local Soil Condition
* Boring/pit/trench survey results (the information is also
* Soil column profile used in fragility
* Survey on groundwater analysis)
* Shear wave velocity data (if any)
* Laboratory/In-situ test results on rocks and soil (b) Inform atio n fo r Perform ing Fragility An alysis Type of Information                                        Desirable Information Documents on
* Architectural/structural drawings for buildings and components Structural Design
* Engineering specifications on material, fabrication and construction
* Design codes/standards used in the plant design
* Any material test results (e.g., concrete cylinder tests, foundation bearing tests).
* Records on the structural analyses including analysis models Information on
* Design drawing of components (e.g., support/frame/panel, electric circuit Component/Equipment            diagrams)
* Any available vibration test results
* Details of anchorage and related design code/standard
* Generic information on the seismic fragility of component/equipment
* Records on failure/repair on equipment Other Information
* Any structural analysis performed for the plant (e.g., seismic analysis of reactor building, integrity analysis of vessels/piping).
* Past records on the structural integrity (e.g., cracks, rusting, settlement and past repair works)
* Availability of supply systems (offsite power, water) 3-8
: 3. Technical Activities Ta sk 2 - Pe rform Prelimin ary P lant Analysis              tabulated, including: the cause of failure, how the failure was detected, the plants condition, the Preliminary analysis of the inform ation gathe red will      repair time, and the effects o f the failure on the verify that the necess ary info rm atio n is available      plant. To quantify the failure probability, the and will identify ad ditional inform ation n eed ed. The    following information is also needed: the number analysis also allows the information to be organized        of times the com ponent is used or challenged, the as inputs to subsequent project tasks.              The    number of similar components at the plant, the test following descriptions specify the output of the            and maintenance strategy, and the time period of preliminary inform ation a nalysis. It is expected that      the collected data.
the specified info rm atio n m ay not be re adily available and significant effort m ay be n eed ed to        Sy ste ms A nalysis obtain the information. It is up to the te am to decide how complete the information has to be                A listing of frontline systems that can potentially be before proceeding to the subsequent tasks. The              used to m itigate the pro gression of probable gathering of this information can be considered the          acc idents started by an initiating event and a listing initiation of the remaining PRA tasks. The task              of support systems including those that provide leader for each of the tasks will be responsible for        autom atic actuation signals should be prepared.
the preliminary analysis.                                    The listing should include one paragraph summ aries describing the function of each system, Re view of Informa tion from Sim ilar Plants                the number of trains in each system, the function(s) each system perform s, and the systems design Any generic in form atio n listed in T able 3-3 that is      capacity. A top-level matrix indicating the system collected should be reviewed for applicability to the        and support sys tem dependency should be current PRA tasks. A description of the potential            prepared.        Inform ation on train-level and use of each item should be given by the task team.          component-level dependencies and setpoints for The items in the table m ay provide ins ights into          autom atic signals should be collected as well.
potential unique accident scenarios or failure m echanisms.        For example, a review of the            Success Criteria Determination Novovoronech PRA m ight find that failure of the reactor coolant pump seal leading to a LO CA is an          References to existing thermal-hydraulic analyses important cause of core damage and m ay hav e to            that determine the timing of potential accidents and be considered in the present analysis. Analysis of          success criteria o f the s ystem s em ployed in the the issue of the vulnerability of pump seals to              analysis sho uld be com piled. This com pilation will LOCA conditions should then be performed, taking            help to determine if any additional supporting into acc oun t plant-s pec ific des ign feature s, to        the rm al-hydraulic analysis is needed at this stage determine applicability. Once an issue is identified        of the stu dy.
as applicable, how it can be modeled in the PRA should be described.                                        Event Tree/Accident Scenario Development Initia ting Ev ent An alysis                                Event sequence diagrams based on the relevant em ergency procedu res for transients, loss-of-The plant incidents that are potential accident              offs ite power, and LOCAs should be developed.
initiating events should be reviewed and tabulated.          The mitigating functions and the system s For each incident, the following should be noted:            associated with the functions should be tabulated.
the date, tim e, and plant c ondition when it occurred, its impac t on plant system s, causes,            Human Reliability Analysis sequence of events leading to its termination, and changes in plant design and operations that                  Relevant emergency procedures should be listed.
resulted from it. Discuss ions of other poss ible            Diagrams of the detailed layout of instrumentation causes of s im ilar e vents would also be useful.            and controls in the control roo m should be obtained/prepared and diagr am identifiers Data Analysis                                                tabulated. A review of the equipment layout Reported failures on plant components should be 3-9
: 3. Technical Activities drawing of various buildings should produce
* deta iled discussions regarding emergency simplified system drawings indicating the physical                  procedures, including walk-throughs of location of key com pon ents that may be needed for                  various accident scenarios.
manual, emergency operation.
: 2. Discussions with plant engineering            and Ta sk 3 - Pla nt V isit                                            maintenance staff concerning:
Usually, the initial plant visit should take between
* data (maintenance logs, licensee event three to five days. Ide ally, the entire PRA team                    reports, etc .) on specific items provided by should participate in the visit. T his allows all team              the team leader to the data analyst, and m em bers to becom e fa m iliar with the design and
* implementation        of  test/ maintenance operation of the plant and bec om e ac qua inted w ith              procedures.
key personnel. This first visit should occur after the team has had a chance to provide a preliminary                3. Discussions with the plant staff concerning analysis of the m ate rial req ueste d. T he plant visit          training practices for various emergency then provides an opportunity to confirm what the                  conditions.
information conveys, why it is needed to perform a PRA, and to clarify any outstanding questions.                4. A visit to the plant simulator (if possible) where Questions and the types of pertinent information                  the operators perform various accident needed for the plant v isit should be sent to the                  scenarios, as outlined by the analysis team.
plant ahead of time so that the visit becom es highly focused. It would be helpful to pre-arrange for              5. A tour of the plant focusing on the systems comm unication devices that allow for easier                      modeled, noting such things as:
com m un ication during plant walkdowns in noisy areas. To optim ize the a vailable time at the plant,
* location of equipm ent (e.g., elevation),
an agreed-upon agenda and schedule of are as to
* room acces sibility (with or without doors),
visit sho uld be prep ared and followe d.
* type of doors (e.g., flood, fire),
* room size, The plant visit generally consists of the following
* natural ventilation conditions, and activities:
* travel time for operators.
: 1. Discussions 2 with plant engineering            and      6. A tour of the control room, noting such things operational staff concerning:                                as:
* normal and emergency configurations of the
* relative location of panels, variou s system s of interes t,
* layout of instrumentation on the panels,
* normal and emergency operation of the
* type of instrumentation on the panels, various systems during various acc idents as
* relative location of emergency procedures in outlined by the analysts,                                    the control room,
* system interdependencies,
* type of controls for system and component
* des ign ch ang es im plem ente d at the plant,                actuation on the panels (e.g., buttons,
* automatic and m anual action s ta ke n in                    switches, key-locked switches, etc.),
response to various emergency conditions,
* type of annunciators and location on panels,
* operational problem areas identified by plant                and personnel that might have a potential impact
* annunciator indication.
on the analysis,
* subtle interactions and failures identified by        After the additional information is obtained during the analysts (or from past studies) that might        the plant visit, the outputs of the preliminary plant be applicable to the present study, and              analysis tas k (as desc ribed in Activity 3) should be finalized to th e exte nt possible before being employed in subsequent tasks in the PRA. The 2
Discussions are documented where required. It              plant information gathering effort continues should be noted that not all analysts participate in          throughout the PRA study so that a coherent PRA every discussion nor visit every plant area, e.g.,            model is developed that reliably reflects the plant control room access is usually very restricted.
3-10
: 3. Technical Activities design and operation. Frequent comm unications                cause failure p roba bilities. Th e hu m an re liability between the PRA team and the point of contact at              an alys is is described in Section 3.2 .5.
the plant is expected. Requests for additional                Quantification, which includes initial and final information and additional plant visits focusing on            quantification of the accident sequences, and specific subjects is expected.                                sen sitivity and importance analyses is discussed in Section 3.2.6.
Exam ples of possible subsequent visits are the following. On e visit could be a walkdown of the              3.2.1 Initiating Event Analysis plant from a spatial interactions/internal plant hazards perspective; a second (and poss ible                  The objective of this activity is to develop a additional) visit(s) could focu s on interac ting with        com plete list of initiating events grouped into plant ope rators to help develop or validate the plant        categories that would facilitate further analyses.
response models. Interaction with the ope rators to            An initiating event is an event that creates a facilitate the quantificatio n of op erato r ac tion s is      disturbance in the plant an d ha s the potential to desirable. It is conc eivable that additional effort at        lead to core damage, depending on the operation the site w ill be necessary to collect the desired            of the various safety systems as well as the plant-specific data. Each visit will have a focused            response of the plant opera tors. T he initiatin g goal, and, therefore, the makeup of e ach plant visit          event analysis is the first ac tivity of a Level 1 team will be tailored for that objective.                      probabilistic risk asses sm ent (PRA ). The initiating event analysis consists of identification and In prac tice , it is likely that formal visits are            selection of events and grouping of these events.
supplemented by frequent informal comm unication between the PRA team and the plant. A point of                3.2.1.1 Assumptions and Limitations con tact, who is very fam iliar with the plant operation, should be appointed as a point of                  The present task classifies initiators as either contact on the plant side to coordinate information            internal or external. Internal initiators are plant requests.                                                      upsets that are associated with the malfunction of plant system s, elec trical distribution systems, or 3.1.4 Task Interfaces                                          are a result of operator errors. External initiators origina te outside the plant. T hey are du e to This current task provides significant inform ation to        hazards, such as external fires and floo ds, se ism ic all of the analytical tasks of the PRA. The task              activity, or other environmental stresses. Floods provides basic information needed for the final                (refer to Section 3.5) and fires (refer to Section 3.6) doc um enta tion.                                              that occur internal to the plan t are conventio nally treated in PRA studies as external events; 3.2      Level 1 Analysis                                    howeve r, they are included in the internal event category in this PRA.
This section provides guidance for each of the The initiating events used in a PRA are by no analytical tasks associated with a Level 1 PRA for means confined to those postulated for design and acc idents initiated by internal events. Sec tion 3.2.1 licensing purposes nor are they associated w ith provides guidance fo r ide ntifying initiating events qualitative qualifiers, such as credible or internal to the plant and is closely related to Section anticipated . Identification of initiating events also 3.2.2, which describes accident sequence requires a new way of thinking for design developm ent. Section 3.2.2 includes subsections engineers, operators, and regulators, i.e., one that deal with the definition of core damage states, focused on the propagation of plant failures.
functional analysis and system success criteria, Review of previous analyses and operational and event sequence mode ling. The systems events can help develop the des ired viewpo int.
analysis is presented in Section 3.2.3.              The Departures from design, through m ate rial systems analysis discussion includes guidance on substitution or field m odifica tion s d ur ing system modeling, qualitative dependency analysis, construction, must be considered in the and the assessment of spatial interactions.
identification of initiating events.
Section 3.2.4 des cribes the data analysis which includes ass e s s m e n ts of initiating event Once the set of initiators has been finalized, any frequencies, component reliability, and comm on-3-11
: 3. Technical Activities other initiators that could have been included a re              supporting rationale.
either presumed to contribute little to the overall risk or are considered outside the present scope of
* documentation of the failure modes and effects the project.      For the Ka linin PR A, the only                analysis performed to identify support system exte rnal events that are considered in the present            initiators and the expected effects on the plant scope are: seismic, internal fires, and internal                  (especially on mitigating system s).
floods.
* documentation of findings of failure modes and The dispositio n of low frequency initiating events              effects analysis (or equivalent) performed on should be documented. For exam ple , in some                      systems, structures, and com pon ents within the PRAs, m ajor structural failure of the pressure                  scope of the change but not modeled in the vessel is not explicitly rep resente d since it is                PRA, to assess their impact on the scope and argued to be such a low frequency event which                    frequency of initiators.
does not con tribute s ignificantly to the risk. In other PRAs, this event has been quantita tively                      The products for the grouping of events task are:
considered by designating it to a specific initiator categ ory, "excessive LO CA," to describe loss-of-
* specific records of the grouping process coolant accidents that are beyond the capability of              including the success criteria for the final core re-flooding an d co oling capa bilities.                    accident initiator groups.
In general, the impact of all possible plant
* any quantitative or qualitative evaluations or operating sta tes on the physics and operational                  assumptions that we re m ade in identifying, considerations leading to spec ific initiating events            screening, or grouping of the initiating events as should be cons idered. However, under the present                we ll as the bases for any assum ptio ns and their scope of the Kalinin PRA, the only plant operating                impact on the final results.
state to be considered is full power operation.
3.2.1.3 Analytical Tasks It should also be recognized that it is not possible to fully ascertain the completeness of any list of            The initiating event analysis consists of two task initiators. The initial list of initiators that pertains      activities:
specifically to the plant being analyzed is presumed to be as complete as possible. Th e PRA analysis              Task 1 - Identification and selection of events m ay subsequently reveal additional initiating                Ta sk 2 - G roup ing of events.
events, particularly as subtle interactions involving suppo rt systems are more completely understood                These activities are described below in general by the PRA analysts. Accordingly, the initial                  terms. An early reference , in which detailed grouping of initiators from this task m ay require            guidance for performing these activities can be m odifica tion as the P RA proc eed s.                        found, is NRC (1983). A more recent discussion can also be found in NRC (199 7). In addition, it is 3.2.1.2 Produ cts                                              also useful to refer to lists of initiating events used in previous PRAs. Such references are pro vided in The prod ucts for the identification and selection of          Section 3 .2.1.5.
initiating events task are:
Prior to describing the two activities, important
* a list or general description of the information            assumptions and limitations are provided.
sources that were used in the task.
Task 1 - Identification and Selection of Even ts
* specific information/records of events (plant specific, industry experience, generic data)            The re are several ways for identifying internal used to identify the applicable initiating events.        initiating events, each having its strengths and limitations. Since the aim is to produce an initiating
* the initiating events co nsidered including bo th            event list that is as com plete as possible, it is the events retained for further examination and            recomm ended that all approaches should be those that were eliminated, along with the                followed in parallel, although one approach may be 3-12
: 3. Technical Activities selected as the main approach. These approaches              Reference to Previous Initiating Event List usually complement each other, especially if they are performed together. The following lists four              It is use ful to refer to lists of initiating e vents drawn wa ys that internal initiating events can be identified:      up for previous PRAs on similar plants and from the safety analysis re port. T his m ay, in fact, be the
: 1.        Engineering evaluation                              starting po int. IAEA (1993a) and INEL (1985), for
: 2.        Reference to previous initiating event lists        example, provide lists of initiators used in selected
: 3.        Deductive analysis                                  light water rea cto r full powe r PRAs . Chu et al.
: 4.        Operational experience.                            (1994) and PLG (1985) provide examples for pressurized water reactor shutdown PRAs. IAEA As des cribed be low, these four approaches                  (1994) is of particular interest since it deals dire ctly complem ent each other providing re asonable                  with identifying and grouping PR A initiating e vents assurance that the list of initiating events is as            for VVER reactors at full power PR As. Table 3-9, complete as possible.                                        taken from IAEA (1994), provides a list of generic initiators for VVER-1000 plants.                Note that Engineering Evaluation                                        Table 3-10 lists some external initiators as well as a reasonably comprehens ive list of internal In this approach, the plant systems (operational              initiators. IAEA (1992) and IAEA (19 93b) are and safety) and major compon ents are                        additional useful sources of information for review.
systematically reviewed to determine whether any of the failure m odes (e.g., failure to operate,              Deductive Analysis spurious operation, breach, disruption, collapse) could lead directly, or in combination with other            In this approach, core damage is usually the top failures, to core damage.          Partial failures of        event in a "m aste r logic diagram ." To provide order systems should also be considered. These types                to the m aster logic diagram, a hierarchical structure of failures are generally less severe than a                  is em ployed . Each level of the structu re is a res ult com plete failure, but they may be of higher                  of events that categorize the level imm ediately frequency and are often less readily detected.                below. Th e top event is, the refore, su cc essively broken down into all possible categories of events Special attention should be given to comm on-                that could cause the event to occur. Successful cause initiators, such as the failure of support              operation of safety systems an d other preventive systems (e.g., specific electric power buses,                actions are not included. The events at the most service water, instrument or control air, or room            fundamental level are then candidates for inclusion cooling features). Postulated failures are sought            in the list of initiating events for the plant. An that result in (or require) the plant or turbine to trip      exam ple of suc h a diagram is given in Figu re 3.1 (or runb ack ) and can cau se a dditional systems to          from P LG (1983). Eight hierarchical levels are fail. Reviews of plant and system operating                  dep icted in the figure, with core damage at Level instructions and abnormal operating instructions of          III. The intended use of this figure had been a bit W estern plants have been found useful for                    broader than the objectives of this task.
identifying subtle interactions between systems.
The experience acquired in these investigations              The m aste r logic diagram is a logic tree that should be utilized here as well.                              identifies necessary conditions for occurrence of the top event, i.e., the top event can occur only if Tables 3-8 and 3-9 give examples how failures of              the lower level events occ ur. It is used to search suppo rt systems a nd "abnormal operating                    for initiating eve nts. G ene rally, additional events instructions" (AOIs) could be scrutinized and                defined by an event tree mu st also occur befo re evaluated as part of an effort to identify potential          core dam age is certain. (Note that the fault trees initiating events.                                            used in systems analysis are different logic models.
They identify both necessary and sufficient conditions for failure of the top event, i.e., the top event is guarantee d to occur if and only if the logic of the tree is actualized.)
3-13
: 3. Technical Activities Table 3-8 Format for failure modes and effects analysis of key support systems System/                                                        Initiating      Plant Model Subsystem          Failure Mode                Effect              Event          Designator          Comments Category All systems or    The faults or failure  The impact of the    The initiating      The plant        Any remarks subsystems        modes identified as    faults on the plant  event              models            that would under            part of the failure    response are          categories          affected by      clarify the consideration    modes and effects      described; for        impacted by the    the failures      failure modes are identified;  analysis are            example, loss of      failures are        are identified    and their for example,      described; for          standby diesel        identified                            impact on the the standby      example, a fault        generator power                                            plant models diesel            leading to              source                                                      should be generator fuel    inadequate fuel oil                                                                added oil supply        to standby diesels Table 3-9    Form at for ab norma l operating instruction review sum mary Potential Initiating      Initiating Event          Plant Model AOI Reviewed        Event Category              Category                Designator                Comments All operating        The initiating event    The initiating event    The plant models          Any remarks that instructions that    categories affected      categories              affected by the AOIs      would clarify the AOIs are evaluated        should be identified    impacted by the        are identified            and their impact on should be            against the              AOIs are identified                              the plant models identified          corresponding AOIs                                                        should be added 3-14
: 3. Technical Activities Table 3-10 Generic list of initiating events for VVER-1000 reactors (IAEA, 1994)
General Categories                                                      Initiating Events General Plant Transients            *Trip of one of two; two of three; or two of four main coolant pumps
                                      *Main coolant pump seizure
                                      *Total loss of primary coolant system flow/trip of all main coolant pumps
                                      *Feedwater flow reduction due to control malfunctions or loss of flow path
                                      *Excess feedwater
                                      *Inadvertent closure of main steam isolation valve
                                      *Inadvertent closure of turbine stop valve
                                      *Turbine control valve malfunction
                                      *Turbine trip
                                      *Total loss of load1
                                      *Generator fault1
                                      *Loss of one 6 kV bus bar
                                      *Loss of substation switchyard or unit transformer
                                      *Loss of intermediate cooling to main coolant pumps
                                      *Spurious reactor trip2
                                      *Reactor scram due to small disturbance2
                                      *Uncontrollable withdrawal of control rod
                                      *Uncontrollable withdrawal of control rod group
                                      *Inadvertent boron dilution
                                      *Control rod ejection without reactor vessel damage Administrative Shutdowns            *Failure of pressurizer spray
                                      *Failure of pressurizer heaters
                                      *Loss of one feedwater pump
                                      *Minor miscellaneous leakage in feedwater/condensate system
                                      *Loss of a condensate pump
                                      *Inadvertent bypass to condenser
                                      *Administratively caused shutdown
                                      *Control rod/control rod group drop
                                      *Very small LOCA and leaks requiring orderly shutdown Loss of Secondary Heat              *Loss of both feedwater pumps Removal                              *Feedwater collector rupture
                                      *Feedwater line rupture that can be isolated by separation of one steam generator and compensated by reserve feedwater pump
                                      *Feedwater line rupture that can be isolated by separation of one steam generator and cannot be compensated by reserve feedwater pump
                                      *Rupture of feedwater pump suction line
                                      *Loss of several condensate pumps
                                      *Loss of condenser vacuum
                                      *Loss of circulating water Loss-of-Offsite Power                *Loss of grid
                                      *Loss of all 6 kV busbars
                                      *Failure of unit auxiliary transformer Non-Isolatable                      *Rupture of feedwater pump discharge line inside containment Steam/Feedwater Line                *Steam line rupture inside containment Leaks Inside Containment 1
May lead to loss of secondary heat sink if loss of condenser vacuum occurs.
2 Unavailability of reactor shutdown function is 0.0 (because reactor is tripped) 3-15
: 3. Technical Activities Table 3-10  Generic list of initiating events for VVER-1000 reactors (IAEA, 1994) (contd)
General Categories                                          Initiating Events Non-Isolatable                *Rupture of feedwater pump discharge line outside containment Steam/Feedwater Line          *Inadvertent opening of steam generator safety valve Leaks Outside Containment    *Inadvertent opening of atmospheric steam dump valve
                              *Steam line rupture outside containment between steam generator and isolating valve Isolatable Steam Leaks        *Rupture of main steam collector Loss-of-Coolant Accidents    *Reactor pressure vessel rupture (LOCAs) Inside                *Large LOCA Containment                  *Medium LOCA
                              *Small LOCA
                                *Small reactor coolant system leakage
                                *Main coolant pump seal leakage
                                *Control rod ejection and LOCA
                                *Pressurizer power-operated relief valve leakage LOCA Outside Containment      *Instrumentation/sample tube rupture
                              *Leakage from make-up/letdown system
                              *Leakage from residual heat removal system
                              *Leakage through intermediate cooling system of main coolant pumps Special Initiators            *Loss of noninterruptible AC power busbar (These need to be            *380 V bus failure considered on a plant-        *Failures in essential DC system specific basis and may lead  *Failures in essential AC power system to events already            *Loss of power to protection/control system considered or a very          *Loss of service water system complicated event requiring  *Loss of intermediate cooling to main coolant pumps a failure modes and effects  *Loss of high pressure air analysis.)                    *Loss of room cooling in a vital instrumentation compartment
                              *Loss of room cooling in a normal control system compartment
                              *Spurious actuation of fire suppression systems (sprinkler + CO 2 + other)
                              *Internal flooding (including spurious actuation of sprinkler system or fire extinguisher)
                              *Internal fires
                              *Flying objects including turbine
                              *Hydrogen explosions in generator and gas blowdown systems 3-16
: 3. Technical Activities Figure 3.1 Master logic diagram 3-17
: 3. Technical Activities This example traces and documents the thought                initiating events should be grouped (or binned) in a process that results from consideration of the                manner that would simplify the ensuing analysis.
question "How can a significant release of                    Each initiating event group should be composed of radioactive material to the environment around the            events that essentially impose the same success site occur?" This question is represented by the              criteria on plant systems.          Similarly, special box on L evel I of Figu re 3.1 . Leve l II repres ents        conditions, such as, for example, similar the argum ent that such a release must be from                challenges to the operator, similar automatic plant either a damaged core or from another source.                responses, and equipm ent function ality, s hould (T his argument was valid for the plant for which the        also be fa ctore d into this grouping process. In the exam ple m aster logic diagram was developed.)                process of gro uping, it will become clear that some Level III represents the argument that a significant          categories of in itiatin g events will need to be release of radioactive material is poss ible only if          sub divided furthe r. Dividing LOCAs by break size exces sive core dam age occ urs and the m aterial            (and perhaps location ) is a well known example, escapes to the e nviron m ent. The remainder of the          but other cases should be expected.            Some diagram emphasizes potential contributors to core            examples are: steam -line break by size, loss of damage. Plant s equences that ultim ate ly res ult in        flow by number of failed pump s, and spurious extensive core damage involve either insufficient            control rod withdrawal by number of rods or rate of cooling of the core or other uncorrected                      reac tivity addition.      The subsequent analysis mism atches between ge nerated power and heat                needed may be reduced by grouping together rem oval. Th is argument is represente d by Le vel IV        initiating events that evoke the same type of plant of the m aste r logic diagram . Le vel V further              response but for which the front-line system delineates the logic for the case of "loss of core            success criteria are not identical. The success cooling" identified in Level IV: loss of core cooling        criteria applied to this grou p of e vents should then occurs only if the reactor coolant boundary fails or          be the m ost restricting for any mem ber of the if there is insufficient core heat removal. Level VI          group. The saving in effort required fo r an alysis pres ents the logic that insufficient core heat              must be weighed against th e conserva tism that this removal is the result of either direct initiators or          grouping introduces. The following criteria should indirect initiators. Indirect initiators are those            be used when grouping initiating events:
disturbances that require add itional plan t failures to result in the ind icated impact. Initiating event
* Initiating events resulting in the same accident categories are articulated in Level VII; specific                progression (i.e., requiring the same systems initiators are then listed in tables that support Level          and operating actions for mitigation) can be VIII.                                                            grouped together. The success criteria for each system required for mitigation (e.g., the required Operational Experience                                          num ber of pum p trains) is the sam e fo r all initiators gro uped togeth er. In addition, all In this approach, the operational history of the plant          grouped initiators should have the same impact (and of similar plants elsewhere) is reviewed for                on the operation and performance of each any events that are not included in the list of                  m itiga t in g s y s te m a n d t h e o p e r a to r.
initiating events. This approach is not expected to              Consideration can also be given to those reveal low frequency events but could identify                  accident progression attributes that co uld com m on-cause initiating events. It should also                influence the subsequent Level 2 analysis verify that the observe d events can be properly                (Section 3.3).
represented by the mitigating event categories being developed through exercise of the previous
* In con form anc e with the criteria above, LOCAs approaches. The list of initiating events should be              can be grouped according to the size and reviewed for any inadvertent omissions and, as a                location of the primary system breach.
further check, to remove any repetitions or                      How ever, primary breaches that bypass the overlaps.                                                        conta inm ent sh ould be treated separately.
Tas k 2 - G roup ing of Ev ents
* Initiating events can be grouped with other initiating events with slightly different accident Once the task of as ses sing the requirem ents of the            progression and success criteria if it can be plant system s has been com pleted, the identified              shown that such treatment bounds the real core 3-18
: 3. Technical Activities damag e frequency and consequences that wo uld              for recovery; therefore, revisions to the event tree result from the initiator. To avoid a distorted              structures and de finitions of top events may be assessment of risk and to obtain valid insights,            required.
grouping of initiators with significantly different success criteria should be avoided. The grouping            Flood Analysis. Floods can induce multiple internal of initiators nece ssitates that the succ ess criteria      initiating events and affect multiple systems helpful for the grouped initiators be the most stringent            for recovery; therefore, revisions to the event tree success criteria of all the individual events in the        structures and definitions of top events may be group. Note that in a sound baseline PRA, low-              required.
frequency initiators are grouped with other relatively high-frequency initiators, rather than            Se ism ic Analysis.      Earthquakes can cause excluding them from further analysis.                        simultaneous failures in structures and equipment needed to prevent core damage. These comm on-3.2.1.4 Task Interfaces                                      cause failures can requ ire sign ificant revisions or additions to internal event PRA m odels.
This task has extensive interactions with the following other PRA tasks:                                  3.2.1.5 References Plant Familiarization. In this task, plant systems          Chu, T.-L., et al., Evaluation of Potential Severe and major components (including operating                    Ac cidents During Low Power and Shutdown at instructions) are re viewe d to determ ine whether          Su rry, Unit 1, NUREG/C R-6144, Brookhaven any of the failure modes could lead directly to core        National Laboratory, June 1994.
damage. Spe cial attention is given to identifying com m on-c aus e initiators .                                IAEA, Generic Initiating Events for PSA for VVER Re acto rs, IAE A-T EC DO C-7 49, In ternational PRA Scope. W ork b eyond the full power operating            Atomic Energy Agency, June 1994.
state is not currently in the scope for the Kalinin PRA. For studies tha t consider add itional states,          IAEA, Defining Initiating Events for Purpose of new initiating events may need to be considered.            Probabilistic Safety Assessment, IAEA-TECDOC-719, International Atomic Energy Agency, Accident Seq uen ce D eve lopm ent. The accident            September 1993a.
initiators provide the starting point for the accident sequence development, and the dependencies                  IAEA, Proceedings of the W orkshop Organized by between initiators and system response are crucial          the IAEA and held in Moscow, 1-5 February 1993, to sequence development and quantification.                  W o r k i n g Ma teri al , IA EA -RE R/9 /0 0 5 - 2 /9 3 ,
International Atomic Energy Agency, February System s Analysis. In this task, support system              1993b.
failures which can c ause initiating events are identified. The initiating events task also provides        IAEA, Report of a W orkshop Organized by the important information to the systems analysis task          IAEA and held in ez, Czechos lovakia, 3-7 as to how system s perform ance is im pacte d by a          February 1992, Working Mate rial, IAEA-J4-005/1, particular initiator.                                        International Atom ic Energy Agenc y, February 1992.
Da ta Analysis. This task provides the information needed for the quantification of the initiating event        INEL, Development of Transient Initiating Event frequencies.                                                Frequencies for Use in Probabilistic Risk Asses sm ents , NUREG/CR-3862, Idaho National Human Reliability Analysis (HRA). The HR A c ould            Engineering Laboratory, May 1985.
influence or modify the identification and selection of initiating events. More im portantly, the HR A w ill      NRC, The Use of PRA in Risk-Informed influence the grouping of initiating events.                Ap plicatio ns, NU RE G-160 2, Draft for Co m m ent, June 1997.
Fire Analysis. Fires can induce multiple internal initiating events and affect multiple systems helpful 3-19
: 3. Technical Activities NRC, PRA Procedure Guides: A Guide to the                conservative assumptions          concerning    core Performance of Probabilistic Risk Assessments for          damage m ay be used.
Nuclear P o we r P la n ts , N U R EG/CR-2300, Volumes 1 and 2, 1983.                                    Plant system com ponents modeled in a PRA are assumed to be fully operational or non-operatio nal.
PLG, Zion Nuclear Plant Residual Heat Removal            Differentiation is not made between full and partial PR A, prepared for Nu clear Safety An alysis Center      operation of a component.          Therefore, PRA of the Electric Power Research Institute, NSAC-84,        methodology does not usually take into account PLG, Inc., July 1985.                                      degraded (e.g., valve partially open) or enhanced performance of a system component (e.g., pump-P LG , D iab lo C an yon Pr ob ab ilistic Ris k          operating near runout conditions), only operation at Asses sm ent, PLG-0637, prepared for Pacific Gas          nominal performance or inoperable.
and Electric Com pany, PLG, Inc., January 1983.
The front-line systems used as event tree headings 3.2.2 Accident Sequence                                    include only those systems present in the plant emergency operating procedures for responding to Development the initiating events defined for the analysis.
Accident sequence development consists of three The Anticipated Transient W ithout Scram (ATW S) interrelated tasks--nam ely, core damage definition, accident sequences for the BW Rs are not alw ays functional analysis and system success criteria, fully delineated. ATW S sequences in which the and event sequence modeling. The first of these functions; reactor subcriticality, Reactor Coolant tasks defines the plant conditions that correspond System (RCS ) overpressure protection and to core damage in a manner that allows sequence inventory control, and core heating are successful, and system succ ess criteria to be unam biguously are assumed to be mitigated. Even if failure of the defined. The ob jective of the second task is to containment overpressure protection function identify the success criteria for plant systems and occurs in an ATW S sequence following success of components. The objective of the task on event the other functions, the sequence frequency is sequence modeling is to determine the range of often below the risk-significant cut-off value, and poss ible plant and operator responses to a wide thus the sequen ce wou ld be screene d from the variety of upset cond itions and to develop event analysis.
trees for all initiating event catego ries that are defined in the task Initiating Event Analysis.
ATWS sequences for PW Rs are tre ated sim ilar to those for BW Rs. As with the BW Rs, low sequence 3.2.2.1 Assumptions and Limitations probabilities for ATW S scenarios prior to the need for conta inm ent overpressure pro tec tion would The delineation of the accident sequence end s with produce non-dom inant s equences even if failure of the determination of the status of the core as safe containment overpressure protecti on was or dam aged. Th e core is defined to be in a safe considered.
condition when the consequences of the radionuclide releases from the damaged fue l would 3.2.2.2 Produ cts be negligible. Realistic ally, core dam age occ urs when the allowa ble peak fue l cladding tempera ture The produ cts fo r the c ore d am age definition task is reached; however, using this definition involves are:
detailed analyses beyond the scope of many studies, so a m ore conserva tive definition is often
* a definition of the plant conditions            that employed. For the Boiling Water Reactors (BW Rs) correspond to core damage and in NURE G-1150, core damag e is ass um ed to occur when the reactor water level is less than two
* a definition of those plant conditions that feet above the bottom of the active fue l. Because represent successful termination of the accident Pressurized W ater Reactors (PW Rs) are not scenarios.
designed to allow ste am cooling, c ore dam age is assumed to occur at th e tim e at which the top of The products for the functional analysis and system the active fuel is uncovered. As knowledge of success criteria task are:
accident progression in the core evolves, less 3-20
: 3. Technical Activities
* a definition of the safety functions to be modeled      categories that are defined in the task Initiating as top events in the event se quence analysis          Event Analysis.
and the system s that provide tho se fu nction s.
Task 1 - Core Damage Definition
* a definition of the equipment for which success criteria will be required, existin g analyses that      The objectives of this task are: (1) to define the could be used to set specific criteria, and new        plant conditions that correspond to core dam age in analyses that may be required.                          a manner that allows sequence and system suc ces s criteria to be unambiguously defined and
* a definition of new supporting analyses for initial      (2) to specify clearly the plant conditions that success criteria selection.                            represent successful termination of postulated scenarios.
* a definition success criteria resulting from the initial mode ling effo rt.                              To meet the objectives of this task, it must be understood that the physical characteristic of the The products of the event sequence modeling task          core that defines core damage has a strong are:                                                      influence on the magnitude of core damage frequency determined by the risk m ode l (refer to
* a set of ESDs that docum ent the range of                Task 2 - Functional Analysis and System Success poss ible plant and operator response to a range        Criteria). Excessively conservative definitions of of upset conditions.                                    core dam age will yield higher ass essed core damage frequencies and, m ore im portantly, w ill
* a com plete s et of event trees to quantify all          like ly impact the perception of the importance of initiating events. This product must include            the individual con tributors to risk. Risk models that complete definitions of top even ts to support          do not fully account for the robustness in the plant system analysis and HRA. Each event tree                design also can contribute to higher damage must be developed from the relevant ESD                frequencies.
showing which ES D elem ents are com bined into single event tree top events, justifying the event      A sim ilar c oncern exists with specifying the tree model as an abstraction of the ESD based          conditions for successful termination of an accident on characteristics of the initiating event and          scenario. Using overly conservative c riteria (e.g .,
approximations well supported by probabilistic          requiring all scenarios initiate d at full power to and eng ineering argum ent.                            proceed to cold shutdown for successful accident termination) could strongly influence the model 3.2.2.3 Task Activities                                    structure a n d com plica te th e m od elin g requ irem ents with little or no added understanding Accident seq uen ce d evelopm ent cons ists of three      in the factors contributing to the risk.
interrelated tasks:
Lik ely sources of conservatism are in the analytical Ta sk 1 - C ore d am age definition,                      too ls (available analyses and computer codes)
Task 2 - Functional analysis and system success            used in the dete rm ination of the outcome of criteria, and                                  postulated accident scenarios. The definition of Ta sk 3 - E vent sequen ce m ode ling.                    core damage must be consistent with the available analytical tools.
The first of these tasks defines the plant conditions that correspond to core damage in a manner that            If conservatism built into the definition, criteria, allows sequence and system success criteria to be          plant models, and an alyses is sus pec ted to unam biguously defined. The objective of the              strongly influence the end result of an accident second task is to iden tify the success criteria for      analysis calculation, then the result should be plant systems a nd components. The objective of            refined. This should be done selectively using the task on event sequ enc e m ode ling is to              m ore realistic m ode ls, but only after the relative determine the ran ge of p ossible plant and operator      importance of all the accident sequ ences have responses to a wide variety of upset conditions and        been initially assessed. It would then be possible to develop event trees for all initiating event            to judge the imp ortance of resolving whether a 3-21
: 3. Technical Activities particular seq uen ce o f events could or could not          and the Zr-water autocatalytic temperature. For lead to core damage, as initially predicted . This          light water reactors, core damage has been iterative nature of reevaluating the results brings          defined when any one of the following conditions with it a caution: sequence-specific re finem ent is        was m et:
not performed on sequences that are not im porta nt and, therefore, use of information from
* Core maxim um fuel temperature approaching unimportant sequences must be m ade with                        2200°F (1204°C) caution. Howe ver, it does make use of time and resources m ore effectively by consistently focusing
* Core exit thermocouple reading exceeding on the more important accident scenarios.                      1200°F (649°C)
The safety philosophy embedded in the reactor
* Core peak nodal temperature exceeding 1800 °F design, particularly with respect to design basis              (982°C) accidents, m ust be reflected in the definitions of "core dam age" a s well as "success." Impacts of
* Liquid level below th e top of the active fu el.
de sig n bas is accidents on the pub lic near the s ite boundaries, and on the operators and engineers              Describing the conditions that characterize the core with in the site boundaries, need to be considered          damage sequences is also necessary for the PRA.
if the successful termination of such accidents has          Experience has proven that if a Level 2 analysis is the poten tial to im pact th e plant personnel.              being contemplated, then it would be prud ent to consider the interface between the Level 1 and A Level 1 PR A usually entails identifying scenarios        Level 2 analyses while the Level 1 models are that lead to severe core damage and determining              being developed.        Typically, th is interface is the corresponding accident scenario frequencies.            expressed in terms of plant damage states. Even The most important definition that must be m ade in          if a Level 2 analysis is not performed, this task is that of core damage. There are several          characterization of the damage states will provide poss ible degrees of core dam age, the s everity          significant insights into the nature of the Level 1 depending on the extent o f core damage and on              scenarios (e.g., which ones will involve successful the magnitude of the resulting releases of                  containment isolation with containment heat radioactive material from the core. One definition          rem oval available).
of core damage is uncovery and heatup of the reactor core to the point where prolonged clad              Each end state of the plant model event trees oxidation a nd s evere fuel dam age is anticipated .        defines an accident sequence that results from an initiating event followed by the succes s or failure of Releases of radioactive material in scenarios that          various plant systems and/or operators responding do not involve core damage could be of concern,              to the accident. Each accident sequence has a also if these releases are sufficient to trigger            unique "signature" due to the particu lar emergency res ponses offsite . Minor radioactive            combination of system/operator successes and releases may be from in-core sources or from                failures. Each accident sequence that results in radionuclides resident in the prim ary coolant circuit.      core dam age should be evaluate d explicitly in How ever, for the Kalinin PRA, c ore dam age will            term s of accident progression and the release of define the scope of the study. The undesired end            radioactive materials. However, since there can be result of the Level 1 scenarios will then be referred        many such seq uen ces , it ma y be im prac tical to to as core damage in the procedures that follow.            evaluate eac h on e sinc e this would enta il performing thermal-hydraulic analyses and The spe cification of th e co nditions as sum ed to          containment event tree split fraction quantification represent core damage must be con sistent with the          for each accident sequence.            Therefore, for VVER design fe atu res as well as with the                  practical reasons, the Level 1 sequences are capabilities of the analysis tools. Fo r the Kalinin        usually grouped into plant damage states or PRA, definition of core damage based on a                    accident class bins. Each bin contains those maxim um a l lo w a b l e fu e l te mp e ra ture is          sequences in which the following features are recomm ended. Other conditions that have been                expected to be similar: the progression of core used are based on phenomena, such as UO 2                    damage, the release of fission products from the tem perature lim its, the triple point of the coolant,      fuel, the status of the containment and containment 3-22
: 3. Technical Activities systems, and the potential for mitigating source              judgment of importance, then use as realistic as terms. Plant damage state bins are used as the                poss ible evaluations for the issues of high entry states (similar to initiating events for the plant      importance. For items of lesser importance, model event trees) to the containment event trees,            conse rvative success criteria must be selected for as described in Section 3.3.                                  each possible modeled condition.            Note that realistic means m ore than best estimate. Best-Task 2 - Functional Analysis and System                      estim ate calculations evaluate the m ost like ly Succe ss C riteria                                conditions. Realistic calculations must be a set of results for each set of conditions, weighted by the Development of the suc ces s criteria involves                prob ability of that set representing the actual investigations into the detailed timing of event              conditions. Frequently, the most risk-significant sequences.          These i n ve s tiga tion s u tilize      results are obtained from unlikely, but troublesome engineering analyses to calculate the tim e                  conditions.
progression of plant param eters and human reliability analyses to help quantify operator                Defining the succes s criteria m ust be an iterative response.        Realistic engineering models can            process, starting with best judgments based on examine many possible scenarios of sequence                  experience, kn owle dge of ex isting plant starting con ditions and equ ipm ent opera bility. As        calculations, and knowledge of the plant PRA a result of developing such detailed information, it          model and its effects on calculational difficulties. It becomes possible to define m ore re alistic                  progresses stepwise as system s analyses are equipment succe ss criteria and to reduce the                completed, event trees are constructed and uncertainty in the tim e available to avoid damage.          evaluated, and preliminary results are developed.
The objectives of this task must be conditioned by            How this task has been performed is not we ll the conflicting goals of realism and costs. Although          documented in existing literature, perhaps because the success criteria of systems/components should            judgment plays a central role.
be as realistic as possible, the effort nee ded to develop these criteria should be consistent with the          Selection of the final success criteria, which risk importance of the particular system function.            progresses by trial and confirmatory analysis, must be driven by the goals of the PR A. T he criteria A PRA is a large-scale scientific and engineering            should be set to ensure that (1) the likelihood that analysis performed for many purposes. The level              the risk is higher than calculated as a result of of effort dedicate d to any particular task must be          errors in the success criteria is relatively small and balanced by its value. Perhaps no task in the PRA            (2) the leading risk contributors have a high requires more balancing of costs and benefits than            prob ability of reflecting the true contributors, rather the skillful selection of realistic success criteria.        than being artifacts of a rbitrarily pe ssim istic Success criteria should specify the minimum                  success criteria. In that way, the goals of the PRA equipment needed for successfully mitigating the              can be achieved.            The PRA becom es the progression of a postulated accident. Success                foundation for the con struc tion of a cohere nt safety criteria also h elp to determine the effects of              basis for the plant. Such a basis permits rational degraded system performance as well as to define              evaluation of a wide range of issues by both the tim e available for recovery for each alternative        regulators and plant staff. This task is broken success path pote ntia lly available to the operators.        down into three separate activities:
Defining rea listic success criteria requires supporting analyses. The cost of neutronic and                1.        Determination of safety functions, the rm al-hydraulic analyses to support maxim um              2.        Assessm ent of function/system realism in a PRA can be p rohib itive. The cost of                      relationships, and bounding analyses for traditional design basis                3.        Assessm ent of success criteria.
analysis is substantial as well. If all possible variations in conditions that are mod eled in the            The first two activities are stra ightforward, with PRA were calculated, not in a bounding way but                clearly defined products (IAEA , 1992). The third realistica lly, an enormous number of calculations            involves substantial iterative w ork with other tasks would be required.                                            to optimize the value of the PRA, while controlling cos ts. W ork in this activity is often defined by One must, therefore, begin with a prelim inary                requests from other PRA tasks.
3-23
: 3. Technical Activities These activities are described below in general            instrumentation diagrams, systems descriptions, terms. More detailed guidance is provided in the            procedures (i.e., emergency, abnormal, and references listed at the end of this chapter. [In          operatin g procedures or instructions), and design particular, refer to Drouin (1987), NRC (1997), and        analyses should be identified and reviewed to NRC (1983).] Selection of success criteria is a            ensure that th e safety functio ns are correctly contin ually evolving element in the PRA process            identified. Th e list of specific operating modes of (Bley, Buttem er, an d Ste tkar, 198 8).                    Ka linin Nuclear Power Station systems that can provide these safety functions will be the product of Activity 1 - Determination of Safety Functions              this tas k.
Safety functions are any physical functions that can        Activity 2 - Assessment of Function/System influence the progression of a postulated accident          Relation ship sequence by preventing or mitigating core damage or the release of radionuclides following core              The frontline system s provide the basis for this damage. The Reactor Safety Study (Rasmussen                activity. All the support systems that are required et al., 1975) introduced high-level sa fety functions:      for succe ssful operation of each frontline system reactor subcriticality, core heat removal, reactor          and its comp onents are identified. A frontline coolant system integrity, containment cooling, and          system dependency matrix is prepared (as fission prod uct re m oval. In order to m ode l safety      introduced in the task on P lant Fam iliarization functions in the event tree/fault tree PRA m odel, it      Section 3.1) which shows (train by train) the impact is nec ess ary to relate them to plant systems. The        of sup port s ystem failures on system operation.
app ropriate plant systems becom e the top e vents        Ne xt, a support system dependency m atrix is in the event trees . Note that som e systems can            prepared that shows (train by train) the impact of provide multiple safety functions and that some            other support system failures on ea ch supp ort functions can be supplied by multiple systems.              system train. Altho ugh this activity is performed during the plant visit described in Section 3.1, it is An example from a recent pressurized water                  function ally part of this tas k. T he d etail and reactor (PW R) PRA in the U.S. will illustrate the          structure of the dependency matrices depend on process. In Ta ble 3-11, the high -level safety            the specific train-by-train design of the plant under functions of the Reactor Safety Stud y are related to      investigation. The precise structure required for m ore detailed functions and finally to specific plant      the Kalinin Nuclear Power Station will not be known systems. In addition to the frontline systems listed        until the detailed Plant Fam iliarization is ca rried out.
in the table, a variety of support systems are required. The link to these systems is provided by          The dependency matrices form the underlying the sup port to frontline system dependency matrix.        basis for the plant model. They describe the Finally, the specific plant systems m odeled in the        physical interrelationships among systems that are PRA will depend on the specific initiating event, the      crucial to proper modeling and are often among the mode of operation prior to the initiating event, the        key factors in risk res ults . This is a rela tively tim e in that mode, and the reliability of each system      straightforward activity and adequate guidance is to provide the function.                                    provided in NRC (19 97) an d D rouin (1987). To an experienced analyst, the dependency matrices For each of the initiating events identified in the        provide the first indication of the plant risk.
task Initiating Event Analysis (Section 3.2.1), the        Interpretation of these rela tion ships is an important safety functions that will be challenged or can be          activity and provides the basis for many judgm ents used to m itigate the initiating event should be            that establish the success criteria.
identified during this activity. These will be the safety functions that will be modeled in the event tree analysis.        The applicable piping and 3-24
: 3. Technical Activities Table 3-11 Safety functions identified in a recent PWR PRA High-Level Safety            Lower-Level Safety Function                  Plant Systems Function Reactor subcriticality                                          *Rod control system
                                                                *Passive-moderator density for large loss-of-coolant accidents (LOCAs)
Core heat removal              Primary system flow and mixing    *Reactor coolant pumps Primary system bleed and feed    *Charging system
                                                                *Pressure relief system Secondary heat removal            *Main steam system (steam dumps, atmospheric steam dumps)
                                                                *Auxiliary feed system
                                                                *Main condensate system
                                                                *Main feed system
                                                                *Service water system Long-term shutdown cooling        *Residual heat removal system
                                                                *Main condensate
                                                                *Main condenser Reactor coolant system        Leak prevention/isolation        *Reactor coolant loop integrity                                                        *Pressure relief system, including block valves
                                                                *Reactor coolant pump seals Primary system depressurization  *Pressure relief system
                                                                *Main steam system (steam dumps, atmospheric steam dumps)
                                                                *Auxiliary feed system
                                                                *Main condensate system
                                                                *Main feed system
                                                                *Service water system Primary system makeup            *Charging system
                                                                *High-pressure injection system
                                                                *Low-pressure injection system Containment cooling                                              *Containment spray
                                                                *Containment fan coolers
                                                                *Passive--containment heat sinks Containment fission product                                      *Containment spray removal                                                          *Passive--steam generators if melt due to steam generator tube rupture 3-25
: 3. Technical Activities Ac tivity 3 - As sess ment of S uccess Criteria              conditions that occur in some PR A sequences (e.g., those with m ultiple failure s), care must be The success criteria are among the most important            taken to ensure that s uccess criteria are still information needed in developing the scenarios in            conservative. Othe rwise, additional engineering the event trees. The success criteria for the                analyses may be required.
frontline system s and the tim ing of a cc ident scenarios are determined in this activity. The                The PRA team evaluates where such criteria may success criteria specify the minimum equipment                be so pessimistic that they will adversely affect the needed, determine the effects of degraded                    PRA resu lts, and the tea m perform s an alysis to systems perform ance, and define the tim e                    improve those success criteria. The team m ust available for recovery for each alternative success          also look for special conditions when the existing path available to the operators.                              calc ulations are n o long er co nse rvative with respect to the c ons iderations o f the P RA m ode l. In In general, the succes s criterion for a system              such cases, revised success criteria are changes with the initiating events and the                    m andatory.
preceding events in the event trees. Therefore, this task must be done in parallel with the event            The product of this task will include the success tree development task , and a system atic                    criteria for all frontline and support systems under assessment will ensure that the succ ess criteria            all initiating event categories and the accident have adequate bases. The assess m ent sh ould                timing info rm atio n that is an input to the human account for the definition of core damage, decay              reliability ana lysis. Th is task also interfaces with hea t, and the mission time. If the plant systems            the tas k Initiating Events.              The backup can prevent core damage from occurring during                documentation (see Chapter 4) should include the the mission time, then the accident sequence is              details of supporting therm al-hydraulic analysis considered successfully terminated. In many                  done specifically for the PRA.
cases, calculation s required for this Ac tivity 3 actu ally estab lish the m ission time.                      The first product of this task will be developed following the initial site visit and will be based upon The determination of success criteria must be                the safe ty functions d efined in Activity 1. Ana lysts based on tests, thermal-hydraulic analyses, other            will identify equipm ent for which success criteria m echanistic analyses, and docu m ented expe rt              will be required. They will identify existing analyses knowledge (Bley, Kaplan, and Johnson, 1992). In              that could be used to set specific criteria and the U.S., the design-basis accident analyses form            examine the poten tial problem s in basing success a useful source of existing calculations. Credible          criteria on these analyses. Bley, Buttemer, and acc idents are defined as s ingle events (e.g .,              Stetkar (1988) and Harrington and Ott (1983) double-ended pipe ruptures, pump trip, pump                  provide a variety of exa m ples to illustrate the kinds seizure, etc.) followed b y the mos t severe single          of analyses that are often perform ed to suppo rt active failure. The most severe of these (i.e., the          PRAs. The examples suggest areas where new one with the minim um m argin to core dam age) is            calculations could enhance the PRA.              These the design-basis accident. In these calculations,            results will fo rm the basis for discuss ions during the most pessimistic assumptions on plant                    the second site visit wh ich will bring the fu ll param eters are m ade to bound the consequences              expertise of the PRA team to bear on success of these accidents. Other analyses of the same or            criteria decisions.
sim ilar plants identified and collected in the task Plant Familiarization are also considered.                    Exam ples of calculational issues in support of Em ergency procedures and other relevant                      success criteria definitions that have proved procedures also provide information relevant to the          important in earlier PW R PRAs are provided below:
success criteria.        Because of their ready availability, these calculations can be used as first        1. Room heatup with no cooling; approximations for es tablishing su cce ss c riteria. At this stage, the criteria are generally conservative.          2. T im e until steam generator dryout following The preexisting information will not be adeq uate to                loss of feedwa ter; determine the succ ess criteria and tim ing of a ll poss ible scenarios.      Unde r the mo re severe            3. T im e un til loc al a cc um ula tors w ou ld be 3-26
: 3. Technical Activities exhausted following loss of instrument air for          for information generated in the other project tasks, m ain steam isolation valves, steam generator          subject to the concurrenc e of the project m anager.
relief valves, pressurizer power operated relief        The amount of supporting analysis is always a valves, etc.;                                          trade-off between technical rigor and the associated value to the users of the PRA.
: 4. Ca pab ility of various pump s to su rviv e function ally with no cooling water, e.g ., would      Ea rly work in PRAs, most notably the Reactor the lube oil tem perature stabilize at a safe          Safety Study (Rasmussen et al., 1975), focused on temperature, would dire ctin g portab le air            large issues--bring ing the prob abilistic view point to blowers on the lube oil cooler help, perhaps if        the field of sa fety asses sm ent, m oving from worst-covered with wet rags;                                  case bounding analyses toward realism, building the first large-scale mod els of integrated plant
: 5. Possibility of pressurizer relief valves lifting        performance, developing the m ethods to structure following a variety of transients, accounting          such m odels (e.g., e vent trees and fau lt trees), and for realistic modeling of pressurizer steam            analyzing events w ell beyond the design basis of space compression;                                      nuclear power plants (e.g., degraded c ore phenomena and the progression and impact of
: 6. T im e un til the feedwater storage tank is            offs ite effects of radionuclide releases). Later, as em pty following a reactor trip und er a variety        the field m atu red, areas of c onserva tism , su btle of specific conditions, e.g., feedwater fails          areas of optimism, and areas wh ere m ore thorough im m ediate ly and condenser steam sum ps fail          analysis could enhance understand ing have been closed followed by uncontrolled auto m atic            revealed and studied.
auxiliary feedwater flow; a similar case but operators control auxiliary feedwater flow,            In the developm ent of PRA event sequence maintaining hot standby conditions; similar            mode ls, success criteria are established for case but operato rs follo w norm al coo ldown          systems and components and for specified rate to cold conditions (i.e., when do they            operator action s (i.e., top events explicitly shown in reach the switchover temperature for residual          the event trees) that can prevent core damage or hea t rem oval cooling ); etc.;                        containment failure. In their simplest and earliest form , suc ces s criteria tell us the minimum
: 7. Bleed and feed behavior under a wide variety            equipment configuration (e.g., n of m pumps must of equipment conditions and operator actions,          operate) required to ensure success of a given focusing on m inim um equipment required and            safety function for all credible conditions. However, cases in which bleed and feed cooling may              the question remains whether failure to meet not work if not initiated in time;                      conse rvative success criteria ensures core melt or whether meeting those criteria ensures success for
: 8. Minimum succ ess criteria for injection pumps          all possible conditions. Be cau se P RA see ks to following a variety of LOCAs; and                      quantify risk (i.e., to quantify what credible me ans),
m ore general succ ess criteria are n eed ed. These
: 9. Pressurized thermal shock calculations under            new success criteria must identify the length of a variety of co nditions.                              tim e the plant can survive in various equipment configurations--that is, th ey m ust identify the tim e This list is only a sam pling of analyses that have          available for specific operator actions or equipment been performed to support PRAs. In the following              recovery. It is not possible to kn ow the available section, examples of hand calculations, s im ple            tim e exactly because of variability in plant computer solutions, a nd the us e of e laborate              conditions and because the teams knowledge is the rm al-hydraulic codes are discussed.          The        imperfect. This uncertainty is properly expressed required analyses vary on a plant-by-plant basis              as a probability distribution.
depending on the availab ility of ex istin g calculations, specific vulnerabilities at each plant,        To establish success c riteria, analysts mus t have the availability of alternative wa ys to satisfy safe ty      well-founded technical knowledge of how s pecific functions, and the tolerable level of conserva tism in        plant equipment and operators respond to a very the fina l res ults . The m ajo r responsibility of the      broad range of operational and accident scenarios.
ana lysts in this task is to respond to the re que sts        One can develop an understanding only through a 3-27
: 3. Technical Activities com bination of operational experience, tests, and          will it take to refill the pressurizer following a seve re analysis. Events that are exp ecte d to occu r quite        overcooling event, how does boiling water reactor frequently would normally fall into the operational          containment pressure and tem perature vary experience category. Events that are included in            following vessel isolation, or how quickly do room s the traditional licensing design basis are often            hea t up with red uced cooling capability, and when covered by testing (sometimes generic in nature)            does that cause equipment failures.
and conservative analyses. These analyses used methods that are approved by regulatory                      The bas ic data needed for many of these authorities and typically include man dated                  calculations include the Am erican Society of assumptions, e.g., the existence of a single active          Mechanical Eng ineers steam tables (Keenan and failure. In the development of PRA m odels, many            Keyes, 1950), the critical mass flux of saturated scenarios lie outside the rather narrow traditional          steam and water developed b y F. J. Moody (1965),
licensing basis of the plant. Therefore, they are not        the decay heat rates outlined in the American included in the accident analyses contained in the          Nuclear Society Guide 5.1 (AN S, 19 94), a nd p lant-plant-specific safety analysis report.            Such      specific data (power, volumes, pum p curves, etc.).
scenarios m ight involve the occurrence of m ultiple        More complex computer calculations using state-failures, the availability of both nonsafety- and            of-the-art therm al-hydraulic and neutronic codes safety-related equipment, and severe accident                are also required at tim es, but the sim pler an alysis scenarios. Th ese are a ccidents which exten d well          sho uld be con sidered first.
beyond the design basis and address the performance of eq uipm ent that can poten tially            The recomm ended approach to follow in selecting m itigate the accident cons equenc es following core        engineering analyses to support PRA recognizes damage.                                                      real-wo rld budget and schedule constraints, while maintaining ade qua te depth on the most significant Ideally, the results of a wide range of analyses            scenarios. It proceeds as follows:
(prim arily thermal-hydraulic and structural and occasionally electrical engineering) would be                1.      Use conservative safety analyses on most available that use best-estimate data and                            scenarios; correlations and can cover the very large number of scenarios considered in a PRA. U nfortun ate ly,          2.      Ap ply sim plifie d an alyses to de ve lop this is seldom the case, and additional analyses                    prelim inary, less conse rvative success c riteria are often needed to support the PRA model. The                      for scenarios that appear particularly additional analyses can range from simplified mass                  sensitive; and energy balances done by hand calculations or sm all microcomputer-based program s to very                3.      Docum ent the analyses and assumptions; sophisticated computer-based models that may include mom entum effects, complex control                  4.      Eva luate the point es timate frequencies of the system interactio ns, and a considerable amount of                  entire PR A m odel; em pirical da ta.
: 5.      Review results to identify the dominant risk In recent years, analysts in the nuclear industry                    contributors; and have focused on elaborate computer codes that have permitted solution of many complex                      6.      Revise the analysis, as requ ired, to obtain phenomena. Along the way, the value of mo re                        realistic and accurate results.
straightforward calculations has often been forgotten. Many questions concerning event              The preliminary risk results are reviewed to identify sequence timing are sim ple therm al-hydraulic              the dom inant risk contributo rs. Areas w here it is problems. All too often, PR A an alysts have shied          important and justifiable to evaluate uncertainties away from refining success criteria because of the          or to perform m ore sophisticated analyses to better cost of run ning sop histicated code s wh en low -cost,      define success criteria are then identified. The sim ple calculation s w ould have adequate ly                goal is to unders tand safe ty quantitatively, not just answered the question at hand. For example,                  to bound the results. Although the engineering questions relating to when the PW R steam                    analyses are "be st e stim ate " an d dete rm inistic in generators will boil dry with no feedwater, how long        nature, there are physical and analytical 3-28
: 3. Technical Activities uncertainties no matter how sophisticated the                save en orm ous effort and cos t later.
analysis. Sensitivity stud ies perm it evaluation of those uncertainties as w ell as th e variability            The delineation of Level 1 accident sequences associated with plant operation.                            ends with the determ ination of the status of the core as safe or damaged as described for the task Task 3 - Event Sequence Modeling                            Core Dam age D efinition. For core damage cases, each sequence is further assigned to a plant The objectives of this task are: (1) to determine the        damage state. These plant dam age states are range of po ssible plant and ope rator resp ons es to        defined so that all sequences within a state are a wide variety of ups et conditions an d (2) to              essentia lly identical with respect to the questions develop event trees for all initiating event                addressed in the Level 2 model. The assumption categories that are defined in the task Initiating          in the Level 2 analysis will be that these sequences Event Ana lysis (Se ction 3.2.1). The event trees            are identica l.
must track sufficient information to perm it assignment of each event tree sequence to one of            Plant com pon ents m odeled in a PRA are generally the defined plant damage states. These activities            assumed to be fully operatio nal or n onoperatio nal.
are described below in general terms. M ore                  Differentiation is not usually made between full and detailed guidance provided in the references listed          partial operation of a com pon ent. Therefore, PRA at the end of this chapter.                                  m ethodology does not usually take into account degraded (e.g., valve partially open) or enhanced The event sequence model is the heart of the PRA.            performance of a s ystem com pon ent (e.g., pump It is the high-level model of how the plant works on        operating near runout conditions).            Precise a functional basis. It relates functions to plant            definition of component functional failure and the systems and provides some information on th e                pos sibility of m odeling degraded states requires tim e sequence of functional interactions. At lower          careful consideration of the potential impact of levels, these func tions a re related to specific plant      these degraded states.
com pon ents and the interrelationships among those components. W hile some PR As develop                  The Inte rnatio nal Ato m ic Energy Agency (IAEA) event trees directly, this procedure guide requires          PRA procedures guide (IAEA, 1992) provides a the intermediate stop of constructing event                  m ore prescriptive alternative to accident sequence sequence diagrams (ESD s). These ESDs are                    event tree development. The more flexible ESD m ore transparently linked to plant operations and          approach is recomm ended for the Kalinin PRA to responses described in the operating instructions            account for any special design characteristics of (especially the em ergency operating proce dures).          the Kalinin VVER-1000 that might affect risk.
They are suitable for review by plant operators and          Pla nt-specific consideration of success criteria may engineers as well as PRA specialists.            They      indica te the need to m odel degraded fu nction ality.
provide documentation for the m ore abstract event          Ad ditionally, the ESD approach has the poten tial to tree m odels and provide a lasting record of the            m ore thoroughly document the basis for the event sim plifications required to develop event trees            sequence model than for the functional event suitab le for quantification. Familiarity with the          tree/s yste m ic event tree approach recom m ended ESDs can ensure that individual systems, data,              by the IAEA.
and human reliability analysts are aware of the role of their work within the overall structure of the PRA        This task is broken do wn into three se para te m odel.                                                      activities:
The process of buildin g the event sequence                  1. De velop fund am enta l ESD s, m odels is inexact and is not like ly to be com pletely codified.      The analyst must balance many                2. Abstract selected PR A ev ent trees from the competing fac tors:          com pleteness, ease of                fundamental ESDs, modeling, efficiency of u se for specific risk m anagement applications, rigor, flexibility, etc. A        3. Test rem aining initiating eve nts against little extra effort in the beginning to understand the            fundamental ESDs and existing event trees.
range of possible applications--those anticipated as we ll as those that could eventually be needed--can          These three activities are desc ribed in m ore deta il 3-29
: 3. Technical Activities below.      T hey form a stepwis e ap proa ch to              loss of primary flow . The ES D displays th e basic developing the event trees with minimum                      relationships between the systems and their impact duplication of effort. The approach is acc essible            on the overall plant status and relates those actions for review by a wide range of expe rts. Moreover, it          required to mitigate the effects of the plant can clearly explain the simplifications ne ces sary to        disturbance caused by the initiating event to the develop practical, useful, quantifiable models. Th is        steps in the plant emergency procedures. The event sequence modeling task forms the                        event trees are developed from the ESDs. The underpinning of the entire PRA model and is,                  specific actions key in determining the accident therefore, closely linked with other tasks in the            progression are identified in the ESDs and grouped PRA.                                                          into top events in the corresponding event tree.
This grouping of actions is displayed in the ESDs to Activity 1 - Develop Fundamental Event                        document the event tree development. Since the Sequence Diagrams                                            ESD does not directly lend itself to accident sequence quantification, construction of the event An event se quence m odel is used to identify the            trees is a necess ary step. A description of the many possible plant response sequences to each                included actions and the success criteria for each initiating event.        Depending on various                top event m ust be de velop ed in d etail with the combinations of plant equipment and operator                  event tree structure. The success criteria identifies response succe ss or failure states, the event                the analysis boundary conditions required for the sequences will either be terminated with no core              systems analysis task s. F inally, each sequence in damage or will lead to core damage and various                the event tree m ust be assigned to its plant degrees of plant damage, defined as plant damage              damage state.
states. The ESDs are generally developed in cooperation with operators at the plant to ensure            The frontline system response to several different the mod el represents the plant as built and as            initiating event categories m ay be similar.
operated.                                                    Therefore, the same event sequence m odels may be used to quantify the risks from m ore than one The first step in plant m ode ling for a PR A is to          such initiating event category, although some develop a general trans ient ESD, i.e., a model for        differences in the fault trees and d ata may be all events in which high pressure can be                      required for proper quantification.            These maintained in the primary system, active core                differences reflect the different conditions imposed cooling is required, and high pressure makeup m ay            by the specific initiatin g event c ate gory.
be needed. This is the most general PRA mo del, one that can be specialized to address most                  Activity 3 - Test Rem aining Initiating Even ts trans ients and accidents. This ESD should be                Against Fundamental ESDs and Existing Event directly applicable to many initiating events,                Trees e.g., sm all LOCA, loss-of-offsite powe r, reactor trip, and turbine trip.                                            The PR A team working on ES D developm ent will review each remaining initiating event against the The second fundamental ESD is that of a large                general transient and large LOCA ESDs, identifying LOCA. For m ost PW Rs, the large LOCA is the                  any structural changes that may be required and most strikingly different ESD be cause low pressure          defining any sp ecial cond itions tha t m ust be injection is required, control rods are not required          accounted for when the individual event trees are for nuclear shutdown, and only long-term cooling is          constructed. The exact number of ESDs and event required. T hus, at least this one new ESD will be            trees req uired for the PR A w ill be determ ined at required.                                                    this time.
Activity 2 - A bstra ct Se lected PR A Even t Trees          Development of the event sequence model is an from the Fundamental ESDs                                    exercise in addressing a wide variety of open-ended que stions .          An insightful and The general transient ESD should provide a                    experienced analyst m ust lead the work integrating com plete m odel for a number of initiating event            knowledge of potential accidents, therm al-hydraulic groups including reactor trip, loss of m ain                  and neutronic response, plant systems and feedwa ter, turbine trip, loss-of-o ffsite power, and        operations, and systems analysis for PRA. Despite 3-30
: 3. Technical Activities efforts to formalize the process, m uch will rem ain                  autom atic ally to control the primary system subjective due to the open-ended nature of the                        at the no-load Tavg temperature by passing problems to be solve d.              Do cum enta tion of              steam to the plant condensers. If the assumptions, simplifications, and approximations,                    conde nsers are not available, secondary and the reasons for them is essential for the                        steam relief is achieved with the steam understanding and future use and modification of                      generator atmospheric steam dum ps.
the stu dy.
: b. If a genera tor trip oc curs first, the sam e Models developed with an eye tow ard flexibility will                sequence occurs.
serve their owners well in the long term. For example, if Le vel 1 m ode ls (NRC , 1983) an ticipate            c. If a reactor trip occurs first and a turbine and Level 2 needs, the Level 2 PRA will require far                      generator trip are delayed, the turbine fewer costly revisions to the Level 1 model and far                  removes the initial decay heat, reducing the less torture d arg um ents to tie the com plete                      need for steam bypass.
analysis together. Sys tem fau lt trees built originally for risk evaluation and identification of dominant            3. Feedwater is added to the steam generators by contributors will need to be expanded, separating                  the auxiliary or emergency feedwater pumps failure rate into demand- and time-based elements,                (main feedwater valves may isolate depending if tes t sc hedule optim ization is desired. Definitions          on plant-specific design features) to mak e up of systems boundaries and decisions concerning                    the steam generator inventory lost by dumping the extent of fa ult tree versus e vent tree m odels              steam.
will affect the ease of testing the effects of design changes on risk.          G enerally, changes to the          4. As reactor decay heat decreases and plant database are easier to implem ent than c han ges to                conditions return to normal, primary system the fault trees, and ch anges to a fault tree are                  tem perature is m aintained a t the no-load T avg easier than cha nge s to an event tree. Many such                  value by the action of the condenser steam trade-off decisions must be made during the PRA                    dum p valves or the atmospheric steam dum ps, developm ent.                                                      or through system steam loads. The steam generator water level is maintained by the water To get a better understanding for the thought                      level control system or by operator action, and process involved in the event sequence mod eling                  recovery from the plant trip comm ences.
task, consider a transient initiating event. The general transient ESD is used to model events that            Failure of a turbine trip results in an excess ive require a reactor trip, turbine trip, and decay heat          steam dem and and could res ult in overcooling the removal for successful mitigation. The normal                  primary system. Automatic steam line isolation plant responses for these initiating events are:              should then occur because of protection system actuation. Failure of steam line isolation and
: 1. Plant conditions result in a demand for a reactor          turbine trip leads to a rapid overcooling of the trip, turbine trip, and generator trip. Sequences        prim ary, automatic initiation of the em ergency core with a succe ssful trip are modeled in the event          cooling system equipment due to the resulting sequence m odel. U nsuccess ful reacto r trip            decrease in prim ary system pressure, and a sequences are m ode led in a sep arate                    poss ible challenge to the reactor pressure vessel transients-with -failure -to-scram m odel.                integrity because of pressurized thermal shock should the RCS be repressurized when the vessel
: 2. The exact sequ encing of reactor, gene rator,              wall is overcooled.
and turbine trips are de sign spe cific an d lead to different requiremen ts for steam relief.                Failure of auxiliary feedwater requ ires operator action to restore ma in feedwater or establish low
: a. If a turbine trip and reac tor trip occur first        pressure conden sate flow to the steam generators.
and are nearly sim ultaneous, steam                  Failure of the steam generator feed systems generator pre ss ure ris es due to the loss of        requires operator action to initiate the "feed and load (turbine trip) and the add ition of core        bleed" mode of cooling the primary and the reactor decay heat as well as stored heat. T ypically,        core. Failure of this mode of cooling results in a condenser ste am dum p valves open                    high pressure core melt because of loss of all heat 3-31
: 3. Technical Activities removal options.                                              subsequent LOC As through dam age to prim ary system equ ipm ent.
If coo ling wa ter system s fail, cooling is lost to key equipment and, in some cases, this can induce Having rea ched this point success fully, long-term          preliminary development of the event sequence cooling needs must be addres sed. Finally, core              models. Judgments about the likely impact of m elt is assum ed to occur for those event                    Activity 3 (Task 2) assumptions on sequence-sequences in which all core coo ling is lost or a            model structure and results guide the work. Later LOCA occurs with no safety injection.                The      in the PRA, the task on Event Sequence Modeling operation of the containment building cooling and            will require additional Activity 3 (Task 2) work as fission product removal syste m s are analyze d in            needed to strengthen and simplify the models.
the core melt sequences since it is nec ess ary to rem ove decay heat and to m inimize the fiss ion              Systems Analysis. Activity 1 (Task 2) defines the product release for these core melt sequences.                system s to be analyzed. Activity 2 (Task 2) provides the interrelationships among systems that 3.2.2.4 Task Interfaces                                      define the fau lt tree structu re, wh ile Activity 3 (Task 2) provides the success criteria for systems The core damage definition task (Task 1) has the              models.
following interfaces:
Human Reliability Analysis. Hum an reliability The functional analysis and system success                    analysis is heavily de pendent on Ac tivity 3 criteria task (Task 2) has the following interfaces:          (Task 2), which defines the time available for various human actions and the extent of action Plant Fam iliarization. Prior to the initial site visit,      required to cope with specific event sequences.
the plant safety functions should be defined. This            Event Sequen ce M ode ling, Hu m an R eliability information is essential background material for              Ana lysis, and Activity 3 (T ask 2 ) are deeply the site visit. During the site visit, a complete first      interrelated.
draft of the dependency matrix must be completed.                                                    Initial Quantification of Accident Sequences. In this task, the results of all the modeling efforts, Core Dama ge D efinition. If the risk results (see            assum ptio ns, and calculations are realized.
Section 3.2.6.1, Initial Quantification of Accident          Invariably, the results are considered as Sequences) are found to be heavily dependent                  prelim inary, requiring further analyses and upon the precise definition of the state of core              refine m ents in the models/assumptions employed.
damage, then additional calculation s could help              Un certainty ana lysis in the q uan tification task will decide the optim al definition. T his additional work        require Activity 3 (Task 2) calculations to assess may also suggest breaking that sta te into m ultiple          the range of possible results. After the results are states with varying impact. These calculations                available, the highest frequency sce narios are must take proper account of reactor dec ay hea t to          analyzed by experienced analysts who look for obtain valid results, especially with respect to              expected con tributors that have not reached the timing. Such calculations are not in the current              final res ults . Problem s in mode ling and success sco pe o f the K alinin PR A.                                criteria will be found along with errors in computer input, calculations, etc. Exte nsions to the success Initiating Ev ent An alysis. Understanding of the            criteria calculations of Activity 3 (Task 2) will be Ka linin plant systems safety functions and                  required to correct these problems.
interrelationships may suggest redefinition of the initiating event group s.                                    The event sequence m odeling task (Task 3) has the following interfaces:
Event Seq uen ce M ode ling. Activity 1 (Task 2) defines the safety functions to be modeled in the            Plant Familiarization.          During the initia l event trees. Activity 2 (Task 2) helps to define the          familiarization task, the preliminary ESDs based on interrelationships am ong syste m s.        A ctivity 3      the relevant emergency procedures for transients, (Task 2) is initially performed in concert with the          loss-of-o ffsite power, and LOCAs should be 3-32
: 3. Technical Activities developed. The m itigating functions and the                Initial Quantification of Accident Sequences. In systems associated with the functions should be            this task, the results of all the modeling efforts, tabulated.                                                  assumptions, and calculations are realized , and invariably, the results at this point are not Initiating Event Analysis. Event trees must be              satisfactory. After the results are available, the developed or applied to each initiating event group.        highest frequency sce narios are analyzed, and An alysis of the impac t of event tree questions on        experienced anal ysts look for ex pec ted each group may lead to a redefinition of the                contributors that have not reached the final results.
groups, combining groups when plant res ponse is            Problems in modeling and defining success criteria suffic iently similar and breaking apart groups or          will be found a long with errors in com pute r input, reassigning spe cific initiating events as new              calculations, etc. Revisions to the event tree insigh ts warrant them . Deta ils of ea ch specific        structures and definitions of top events will almost initiating event that can affect system s m odeled in      certainly be required. Project managem ent must the event tree m ust be properly accoun ted for.            anticipate sub stantial effort for review and revision.
Fu nctional Analysis and System s S uccess Criteria.        Fire, Flood, and Seismic Analyses. Event trees This task and the current task are highly coupled          from the internal events analysis will generally and performed in an iterative fashion. In Task 2            serve to model fire-, flood-, and seismic-induced (Functional Analysis and Systems Succ ess                  sequences. Because these types of initiating Criteria), Activity 1, D eterm ination of Safety            events can induce m ultiple internal initiating e vents Functions, defines the safety functions to be              and affect multiple systems helpful for recovery, modeled in the event trees. Task 2, Activity 2,            revisions to the event tree structures and Assessm ent of Function/System R elationships,              definitions of top events may be required.
provides the defining interrelationships among systems. Task 2, Activity 3, Assessme nt of                3.2.2.5 References Success Criteria, is initially perform ed in concert with the pre lim inary development of the event            ANS, American National Standard for Decay Heat sequence models. Judgemen ts a bout th e lik ely            Powe rs in Light W ater Reactors, American impact of these assumptions on resu lts and model          Nuclear Soc iety Standards W orking Group, structure guide by the early work. Later in the            ANSI/ANS-5.1-1994, American Nuclear Society, proje ct, Task 3 will pro m pt additional Activity 3        1994.
work as needed to strength and simplify the m ode ls.                                                  Ble y, D. C., S. Kaplan, and D. H. Johnson, "The Strengths and Lim itations of PSA: W here W e Systems Analysis.          The event tree sets the          Stand ," Reliability Engineering and Systems boundary conditions for the system models. As              Safety, 38, pg. 3-26, 1992.
part of this activity, a qualitative dependency analysis is performed which searches for                    Ble y, D. C., D. R. Buttemer, and J. W . Stetkar, dependencies to insure that all significant                "Light W ate r Reacto r Sequence T im ing: Its dependencies are reflected in the final models.            Significance to Probabilistic Safety Assessme nt Model enhancem ents to m ore acc urate ly reflect          Mo deling," Accident Sequence Modeling: Human function al, spa tial, and human-induced interactions      Actions System Response, Intelligent Decision m ay be requ ired as a re sult.                            Suppo rt, G. E. Apostolakis, P. Kafka, and G. Mancini, editors, Elsevier Applied Science, Human Re liability A nalysis. Human reliability            1988.
analysis (HRA ) is heavily dependent on event sequence m odeling. Proper consideration of                Drouin, M., et al., Ana lysis of Core Damage factors affecting the plant and human context for          Frequency from Internal Eve nts: M ethodology HRA, including dependencies among hum an                    G uid elin es, V o lu m e 1 , N UREG/CR -4550, actions, will affect the structure of the event trees.      September 1987.
Conservative, unrealistic systems m odels cannot be supported with meaningful HRA. Modeling                  Harrington, R. M ., and L. J. Ott, The Effect of human actions under situations that will not occur          Sm all Capacity, High Pressure Injection Systems is an exercise in irrelevance.                              on TQU V Sequences at Browns Ferry Unit One ,
3-33
: 3. Technical Activities NURE G/CR-3179, Oak Ridge National Laboratory,              3.2.3.1 Assumptions and Limitations September 1983.
The analysis boundaries are based on IAEA, Procedures for Co nducting Probabilistic              function ality. Th erefore, it is im portant to clearly Safety Ass ess m ents of N uclear Powe r Plan ts            define the boundaries of the syste m , wh ich will (Level 1), Safety Series No. 50-P-4, International          like ly be different than the boundaries specified by Atomic Energy Agency, 1992.                                  the normal system desc ription s. F or exam ple, if a portion of a service water line serves only the Keenan, J. H., and F. G . Keyes, Th ermodynam ic            pumps of the residual heat removal (RHR) system Properties of Steam , John W iley, New York,                (and failure of that line would only impact the RHR November 1950.                                              system ), then the availability of that line would be Moody, F. J., Ma xim um Flow Ra te of a S ingle              analyzed as part of the RHR system.                The Compon ent, Tw o-Phas e Mixture, Am erican                  boundaries of the RHR system for the purpose of Society of Mechanical Engineers, New York,                  this analysis would, th erefore, include that sp ecific February 1965.                                              service water line.
NRC, The Use of PRA in Risk-Informed                        Not all systems are analyzed to the same level of Application s, NURE G-1602, Draft Report for                detail. Th e appropriate level of an alysis deta il is Com ment, June 1997.                                        governed by the importance of the system in relation to its role in preventing or delaying core NRC, PRA Procedures Guide: A Guide to the                  damag e and the complexity of the system. An Performance of Probabilistic Risk Assessments for            important consideration is the depth at which the Nuclear Power Plants, NUREG/CR-2300, U.S.                  supporting data best provides a quan titative Nuclear Regulatory Com mission, January 1983.                characterization of the una vailability of the system.
Rasm ussen, N. C., et a l., R eacto r Safety S tud y:      3.2.3.2 Produ cts An Assessment of Accident Risks in U.S.
Com mercial Nuclear Power Plants, W ASH-1400,              The products of the system m odeling task are:
NURE G-75/014, U.S. Nuclear Regula tory Com mission, October 1975.
* a portion of the "Systems Analysis" and the "F au lt Tree" sections of the backup 3.2.3 Systems Analysis                                          doc um enta tion.
The system s an alysis co nsists of three interrelated
* the system logic m od els in elec tronic form tas ks --n am ely , s y s te m m ode ling, su btle              suitab le for use in the sequence quantification interactions, and spatial interactions. The first of            activity.
these tasks is the heart of the systems analysis.
The objective of the task on system m odeling is to          The product of the subtle interactions task are:
develop the system logic models (e.g., through the use of fault trees) that will be used to support the
* descriptions      of    the    applica ble subtle event sequence quantification. The objective of                  interactions that have been identified, the the task on subtle interac tions is to iden tify and to          sources of information used, and the guidance explicitly model subtle interactions th at c ould                as to how these interactions should be modeled pote ntia lly cause single or multiple compone nt                within the Kalinin PRA logic models.
the U.S., the design-basis accident analyses form a useful source of existing calculations. Credible        The product of the spatial interactions task are:
accidents are defined as single events (e.g.
double-ended pip e ruptures, pump trip, pump
* a scheme for des cribing plant loc ations , a form failures, which are neither covered by a comm on-                sp ec ialized for the plant to assist in the cause failure analysis nor addressed in the                      documentation of the plant walkdown, a set of dependency m atrix. The objective of the task on                completed walkdow n form s, and an information spatial interactions is to identify potential                    database that describes the location of hazards environm enta l hazard sc enarios at the plant.                  as w ell as plant eq uipm ent of interest.
3-34
: 3. Technical Activities
* draft material for the final rep ort. Specifically, a      operating instructions, system surveillance draft portion of the "Spatial Interactions" section        instructions, and m ainten ance pro cedures. It is of the m ain report will be developed that will            also importa nt for the analyst to understand the include a description of the methodology used              system requirements within the context of the to identify and screen hazard scenarios and the            event tree m ode l and the event tree he adings.
information derived by the analysis.            The information derived includes the identification            The analyst sh ould exam ine all available and characterization of plant hazards, the                information collected in Pla nt F am iliarizatio n in location and re lative apportion m ent of plant            order to gain insights into the potential for equipment according to location, and tables                independent or dependent failures in the systems describing the potential hazard scenarios                  and the potential for system interactions. The information contains descriptions of all types of 3.2.3.3 Analytical Tasks                                      failures that ha ve occu rred at the p lant and possibly at similar plants.
Task 1 - System M odeling The developm ent of suppo rt system-to-supp ort The goal of this tas k is to develop the syste m logic        system and support system-to-frontline system m odels necessary to support the event model                  dependency matrices, along with a com prehens ive activities, including possibly the determination of            set of exp lanatory notes that clea rly depict the the frequency of selected initiating events, along            functional relationship between systems and with the sup porting do cum enta tion.                        system trains, is needed early on in this analysis.
These matrices may have been drafted as part of This task consists of constructing models for those            the task Plant Fa m iliarization but should be systems to be considered in the PRA. The most                  updated and kept current as part of the present usual elem ent of these m odels is the fa ilure or            task. A simplified example of a dependency success of a system. The details of the events                m atrix is inc luded as Figure 3.2 .
can be analyzed through one of a number of system modeling tec hniques (i.e., fault trees , state        A schematic for each system needs to be space diagram s, reliability block diagrams, or go            developed. Howev er, the plant drawings are charts). These techniques are desc ribed below in              usually very detailed, containing considerably more general term s. More detailed guidance is provided            information than is required in the system s in the references listed at the end of this chapter.          analysis task. A simplified system schem atic that
[In particular, refer to Drouin (1987) and NRC                defines the system to a level of de tail (1997).] In addition, an exc ellent reference to              com m ens urate with the needs of the system systems analysis can be found in Section 5 of                  analyst is, th erefore, necessary.
Ericson et al. (1990). Fault tree analysis is the method for developing system m odels in this                  To facilitate the analysis task, a table is created by stud y.                                                        the analyst that depicts the status of the system com pon ents (i.e., pumps and valves) under at Before any fau lt trees are developed, it is                  least two sets of conditions:
neces sary to have a very good understanding of the system operation, the operation of the system
* when the plant is operating normally (i.e., the components, and the effects of com ponent failure                  initial conditions for the analysis) and on system suc ces s. Sources of information that
* when the system responds to a plant initiating the analyst can use to gain this understanding of                  event.
the norm al and em erge ncy opera tion of the systems are: s ystem training noteboo ks , system 3-35
: 3. Technical Activities Fig ure 3.2 Exam ple o f depend ency m atrix 3-36
: 3. Technical Activities No te that m ultiple cases m ay be necessary in              the fault tree. Alternatively, the data m ay have defining the desired component status to all of the          been expressed in such a manner that mak es plant even ts of inte rest.                                  m ore than one basic event appropriate. It has been sho wn th at due to inherent conservatism s in The analyst should also determine the potential for          most databases, developing data at too fine a level each system to initiate an accident, should the              (e.g., resistors, c apacito rs, and othe r ele ctronic system inadvertently (or prematurely) operate,                com pon ents in an amplifier) may result in an malfunction, or fail. These will be com pared with            inaccurate determination of the performance of the the identified initiators (see Section 3.2.1), and new        overall assemblage.        For some systems (for plant initiators will be added, as appropriate. The          example, balan ce o f plant system s), the available poss ible identification of initiating events under this      data may be best defined at a rathe r hig h level, task is meant to complement the activity described            such as at th e train or s yste m level.
in Section 3.2.1. In other PRA studies, the system analysts have often developed a level of                      An example of a simple fault tree is included as understanding of the systems and have provided                Figure 3.3. T he s ystem represented in the fa ult insigh ts into the modes of system failure that make          tree is a backup cooling system represented by top such a com plem entary activity beneficial.                  event "BU" in an event tree. B oth pum ps in this sim ple example are initially in standby and each Fa ult tree analysis is a com m on method used for            represe nts 100 percent capacity for delivering the representing the failure logic of plant systems. An          required flow . Ea ch train is tes ted periodically undesired state of a system is specified, and the            using a bypass line, which would render that train system is then ana lyzed in the con text of its              inoperable if left in the incorrect position following environment and operation to find all the credible            the test. The two trains share a comm on suction wa ys in which the unde sired state could occur.              valve and a com mon discharge check valve.
The fault tree is a graphic representation of the            Motive power, control power, room cooling, various combinations of events that would res ult in          actuation sign als , and all other support are all the occ urrence of the pred efined un des ired event.        assumed available. This assumption is made only The events are such things as component                      to sim plify the discus sion; it would not be hardware failu res, h um an errors, m aintenance or          appropriate in the PRA system m odels.
test una vailabilities, or any other pertine nt eve nts that could lead to the undesired state. A fault tree          Another example is taken from an actual PRA thus depicts th e logical interrelations of b asic            application (Chu et al., 1994) that utilized the events that lead to the top event of the fault tree.          Integrated Reliability and Risk Analysis System These interrelations usually can be depicted as              (IRRAS) com puter code for fault tree quantification.
combinations of events in parallel or series,                This example (Figure 3.4) addresses a portion of developed to the point where the data are best                the logic developed for a flu id syste m . This defined. Th is m ay be at th e com ponent level,              system, called the Ins ide Spray Recirculation subass em bly level, or even, in ve ry specific cases,        System, requires both trains to be operable for the at the system or subsystem level. The system                  success of the particular top event considered.
ana lysts must, therefore, work closely with the data        Transfers to other fault trees that are us ed to ana lysts to determine the level at which the basic          develop the logic further (e.g., "failure of 120V DC event data are best defined.            For example,        bus 1A") are indicated by triangles.
successful operation of a system m ay require the operation of a sensor and an associated signal                The general techniques for constructing, processing unit that together con stitute a com plete        manipulating, and quantifying fault trees are logic channel. However, the data analysts may                described in Haasl et al. (1981). However, the have developed the da ta only to the level of the            following issues merit special consideration in the logic channel, in which case only a single basic              development of fault trees:
event (at the logic-channel leve l) is a ppropriate in 3-37
: 3. Technical Activities Figure 3.3 Example of fault tree for backup cooling system 3-38
: 3. Technical Activities Figure 3.4 Example fault tree for inside spray recirculation 3-39
: 3. Technical Activities
: 1. In order to facilitate consistency of the
* for support systems providing various individual fault tree analyses, it is necessa ry                    m edia (water, oil, air), at the main header that the definition of system boundaries and                        line of the support system.
the conventio ns used to represent logic symbols, event coding, and representation of                    In cases where equipment or piping is shared human errors and comm on cause failures be                      between several system s, g uidance to the a prio ri sp ecified for all the fault tree analysts.          proper establishm ent of the system bounda ry It is suggested that one system analysis be                    is usually provided by the system descriptions prepared before the fault trees for the other                  and draw ings. Suc h ca ses m ust be bro ugh t to systems are started to serve as a guide.                        the attention of the system analysis task leader Hum an actions that occur following the                        in order to avoid possible omissions and/or initiating event are properly treated at the event              dou ble co unting of sh ared com pon ents .
tree level. The only human actions that should be included as events in the fault trees are                6. It is im porta nt that a standa rdized form at be those actions that potentially follow test and                  used for coding the basic events in the fa ult maintenance.                                                    trees. The formatting scheme sh ould be com patible with the IRRAS code for the
: 2. All assumptions made while constructing a                      systems analysis, and the scheme should also fault tree s hou ld be d ocu m ente d, togethe r with          enable the basic events to be clearly related to the source (an d revision num ber) of all design                the following:
information used. In this way, co nsiste ncy will be promoted throughout the analysis and
* com pon ent fa ilure m ode ,
traceability will be maintained.
* specific component identification and type,
* specific system in which the component is
: 3. W hen systems are not modeled in detail and                          located, and reliability data at the system level a re used,
* plant codings for the components.
failure events that are comm on with other systems should be separate d out and explicitly                To prepare the system m odels for either the considered.                                                    concurrent or subsequent evaluation of environmental hazards, the system m odels
: 4. Computerized methods should be used for                        should conta in additional information on the handling the solution and quantification of fault              location of the component and on the trees        to    ensure        c o n s is t e n c y,        sus cep tibility of the component to the com prehensiveness, e ffic iency, a nd quality.                environmental hazard of interest (e.g .,
earthquake, fire, or flood). It is suggested that
: 5. It is strongly recom mended that clear and                      information of this type be encoded within the precise definitions of system boundaries be                    component name or provided o n se para te established before the analysis begins. Any                    tables correlating events w ith applicable modifications to these definitions should be                    information.
made known to all the other s ystem ana lysts during the course of the analysis. T he analysis                To assist the analysis of dependent failures bounda ry definitions should be included in the                (other than those caused by extrem e final documentation covering the systems                        environm ents), the coding schem e should modeling.        The interface points between                  include information on location, designation of frontline systems and various support systems                  generic type, and test and maintenance could, for example, be located as follows:                      procedures.
* for electrical power supply, at the buses              7. Fa ult trees should re present all possible failure from which com ponents considered within                  modes that m ay contribute to th e system's the system are fed;                                      unava i la b ility. T h i s s h o u ld i n c lu d e contributions due to outages of a system (or a
* for actuation signals, at the a ppro priate              portion of a system) for testing and output cabinets of the actuation system;                  maintenance. Hum an e rrors ass ociated w ith and                                                      failure to restore equipm ent to its operable 3-40
: 3. Technical Activities state following testing and maintenance and                          -    The re can be instances when there is a human errors associated with accident                                      set of multiple failure events which explicit response should also be included where                                    modeling of the cause is fe asible (even in applicable.            Considerations of potential                        principle) but not perform ed because it operator recovery actions are often spe cific to                          wo uld be too difficult. Encapsulating the accident sequen ces and are best treated in the                            events in a parametric model is the quantification of accident sequences (see                                  preferred approach. The decision is made Sections 3.2.6.1 and 3.2.6.2).                                            by the analyst based on experience and judg m ent, tak ing into consideration the
: 8. The following aspects of dependent failures                                aim and scope of the analysis. In other sho uld be reflec ted in the fau lt trees:                                cases, ex plic it model i ng m ay b e im practica ble because the com ponent
* interrelations between initiating events and                          failure data do not allow different failure system response,                                                      causes to be distinguished.          Ex plicit modeling should in principle go as far as
      -            comm on supp ort system faults                          reasonable, largely depending on the affecting more than one front line                      resources for the analysis and the level of system or component through                              detail required.      Otherwise, an upper functiona l depe nde ncies,                              bound should be assessed and param etric modeling used. Th e analyst s hould clearly
      -            human errors ass ociated w ith                          document the pa ram etric m od elin g com m on test and maintenance                            approach, the input, and the events that activities, and                                          have been m odeled explicitly.
* com pon ents              shared    among    frontline      9. The operability of som e syste m s in resp ons e to system s.                                                        an initiating event can be directly affected by the initiating event. Loss-of-coolant accident Dependent events should be modeled either                            and loss-of-offs ite pow er are two initiating explicitly or implicitly as noted in the following                    events that can directly affect the performance points:                                                              of the responding systems. For these cases, the im pact of the initiating event on the
  -  Multiple failure events for which a clear                        ope rability of each system should be explicitly cause-effect relation can be identified                          included in each system fault tree. Th is should be explicitly m odeled in the system                      representation also permits the proper m odel. The root cause of these events                            quantification of the accident seq uen ces . In should be included in the system fault tree                      the small event tree/large fault tree approach, so that no further special dependent failure                      which has been adopted in this study, the model is necessary.                  This applies to            impact of the initiating events can occur at the m ultiple failures either caused by an                            com pon ent level.
internal equipment failure (such as c a s c a d e f a il u re s a n d f u n c t io n a l          10. To simplify and reduce the size of the fau lt u n a v a i l a b i l i t y e v e n ts c a u s e d b y            trees, certain events are often excluded owing components) or resulting from a clearly                          to their low probability in comparison with other identifiable hum an error (such as human                          events. Examples of simplifying assumptions error in the steps of a prescribed                                are illustrated below:
procedu re).
                                                                        -    Flow diversion paths for fluid systems
  -  Multiple failure events that are susc eptible                          should be considered only if th ey could to dependencies, and for which no clear                                seriously degrade or fail the system . A root cause event can be identified, can be                            general rule is that the divers ion pa th may modeled using implicit methods, such as                                be ignored for failure to start if the pipe the param etric m odels (see Sec tion 3.2.3).                          diameter of the diversion path is less than one third of the primary flow path.
3-41
: 3. Technical Activities
    -    Spurious con trol faults for com pon ents          Task 2 - Subtle Interactions after initial operation should only be considered if the component is expected            The objectives of this ta sk are to identify an d to to receive an additional signal to readjust        explicitly model subtle interaction s th at c ould or change its operating state during the          poten tially cause single or multiple component acc ident.                                        failures, which are neither covered by a comm on cause failu re analysis nor addressed in the
    -    Position faults prior to an accident are not      dependency m atrix. Ideally, most interactions included if the component receives an              would be caught in the system analyses, autom atic signal to re turn to its operable      dependency m atrices, a nd event tree m odels. This state under accident conditions.                  task would allow the analyst to systematically look for additional interactions that c ould have been Assumptions of this type must, of course, be            m issed in the earlier a nalyse s.
doc um ente d an d jus tified in the PR A report.
Su btle interactions are categorized as interactions
: 11. The testing procedures used in the plant must            between compo nen ts and/or systems that can be be clo se ly examined to see whether                    caused by changes in the operating environment of implementation of the procedures can                    the com pon ents , by conditions directly related to introduce poten tial failure m odes. All potential      specific plant design and operational features or failure modes identified must be documented.            from the progression of a given accident sequence.
An example would be if, during testing, the flow        These types o f interactions mostly stem from path through a valve is isolated, and at the end        m echanistic causes. If they could be identified a of the test, the flow path remains closed                priori, then these interactions could be explicitly (possibly due to hum an e rror) w ith no                modeled in event trees or fault trees by using indication that the flow path is still closed.          house events that would reflect the necess ary causal relationships. Two examples that illustrate
: 12. Tripping of pumps and other safeguards,                  these types of interactions are provided below:
intended to protect a component, must be carefully identified since they can be a source          1. In a two-train, cross-tied system, failure of a of com m on m ode failure.          For example,              discharge check valve (stuck open) could spurious trips of auxiliary feedwater pumps on                cause failu re of the system . This can occur low suction pressure can lead to system failure              when one pump has been turned on while the if recovery does not occur.                                  pum p in the other train has failed to start and run. In th is case, the flow simply recirculates
: 13. In a sequence in which som e systems succeed                  back ward through the idle pum p.          T his wh ile others fail, it is important to make the              conditional interac tion within a system would system failures correctly conditional on the                  depend on a check valve fa ilure in the cross-tie other systems ' success es. Succe ss trees are                line and on the pump in the other train being one way for expressing this conditional                      idle. These types of mechanically determined c or r es pondenc e .      T h e re a re certain              interactions should be identified through advantages that are offered by algorithms                    detailed system evaluations and accounted for which operate on the top event by sim ply                    explicitly in system fault trees.
deleting cutse ts th at violate the system success specified in the sequence.                      2. For certain types of motor-operated valve designs and for some systems where these Fault trees are to be used in the present analysis.              m otor-operated valve types are periodically Other m etho ds h ave bee n us ed in P RA s. Selected            tested using a low differential pressure ()P),
issues, such as the determination of the frequency                there is little or no assurance that the valves of an event initiated by the failure of a norm ally              wo uld reliably operate when exposed to a high operating multiple train, may be best addressed by                )P attributable to the pro gression of specific a m eth od other than fa ult trees. F or info rm atio n          PRA scenarios. The unavailability of these purposes, two other m ethods are highlighted                      m otor-operated valves (both single and below.                                                            multiple) then would be dependent on the )P that is im pos ed b y the ac cident sequence 3-42
: 3. Technical Activities being analyzed. Appropriate house events                  augmentation of current PRAs.
should be used in the fau lt trees that ex plicitly consider the expected )P on va lve operab ility            Review of Literature for the sce narios be ing an alyzed.
The appropriate literature is reviewed and the The above examples focused on hardware-                          current understanding of any subtle interactions oriented subtle interactions. There are also subtle              that are considered applicable to the Ka linin plant human interaction s that c ould cause m ultiple                  is documented. The focus of the literature review component failures.          These types of human-                deals with information gleaned from past PRAs and cause d subtle interactions are covered in the task              reports doc um enting their insights, various sa fety Hum an Re liability Analysis (see Sec tion 3.2.5).                studies, generic issues, etc.            For example, N U R EG /C R -4550 (Ericso n, 1 99 0) co nta ins The process by which these forms of subtle                        anecdotal information on som e of the experiences inte ractio ns are identified is not well structured.            with subtle interactions found in U.S. plants. There The re are various information sources in the open                could be other, more relevant information sources.
literature that can be used for identifying these                A starting point, fo r exa m ple, co uld be the ins ights types of interactions. These sources include: past                found in current or rece nt PRA studies for other PRAs, historica l events across the industry, and                VVER plants as those found in the IAEA document U.S. Nuclear Regulatory Com mission (NRC)                        W W ER-S C-152 (IAEA, 1996).
repo rts on industry-wide experiences. These doc um ents are reviewed to see whether the                      Cataloging Subtle Interactions interactions described are applicable for the specific PRA.            Besides these sources of                The cu rre nt u nd ersta nd ing of the subtle information for identifying poten tial plant-specific            interactions, based on major historical events and subtle interactio ns, the analysis should re ly heavily          other formalized studies, is catalogued in a manner on engineering judgment and in-depth system                      suitab le for data analysis. Summ ary of generic evaluations to assure that as many interactions as                issues, issues identified in annual reports (such as p o s s i b l e a r e id e n t if ie d a n d m o d e l e d .      NRC, 1996) pu blished by the NRC O ffice of Notwithstanding, the guidance presented here and                  An alysis and Evaluation of O pera tional Data, the state-of-the-art in PRA m ethodology do not                  annual reports (NRC, 1986) generated by the provide any as suranc es that the list of identified              Accident Sequence Precursor Studies Program, interactions is complete and comprehensive.                      and NRC notices are some of the documents Furthermore, the lack of national and international              typic ally review ed. Inte rviews with plant s taff could databases documenting subtle interactions hinder                  also be quite useful in this case.
future progress towards a compreh en sive dependency ana lysis. Th erefore, the ex tent to                  Engineering Evaluations which these analyses are considered as com plete would depend on the individual capabilities and                  Engineering evaluations are performed by selecting combined experience of the PRA team. Assigning                    a group of components that have a comm on the occurrence probabilities to th ese subtle                    characteristic--for example, same location, same i n te r a c ti o n s wou ld, how eve r, b e ra t h er            actuation logic, etc. The engineering evaluation straightforward once the underlying mechanism for                could be a set of what if questions that exam ine their occurrences is understood.                                  the conditions imposed by various scenarios on the system and the performance of com ponents with in The following activities are normally performed as                the system. These engineering evaluations should part of this task. However, it should be noted that              be perform ed with the help of plant staff who may U.S. prac tice in this area reflects embedded                    already suspec t or be aware of these types of assumptions regarding U.S. plant design features                  plant-spe cific interaction s.
and m aintenance prac tices. Therefore, for the present application, the guidance provided for this task sho uld be rega rded only as a starting po int.
Development of a design-specific database on poss ible sub tle interaction for diffe rent designs wo uld be a positive step for future PRAs and 3-43
: 3. Technical Activities Documentation                                                  PRA. During the conduct of this task, it is assumed that the internal events plant m odel is suffic iently Any subtle interactions considered relevant to the              m ature so that co nservative but defensible PRA are docum ented. One or m ore ways in which                screening of scenarios can be acc om plished. It is the plant logic models (fault trees and event trees)            unlike ly that a "final" plant m odel will be available can be augm ented are pro posed that w ill                      when this task is being performed. Therefore, any appropriately acc oun t for the m ech anis tic                  plant m odel changes m ade after the scenario processes involved with th ese interac tions. W ays            screening process has been performed should be for estimating the probabilities for such                      reviewed to determine if the results of the occurrences are also proposed and, wherever                    screening process are affected.
possible, estim ates are p rovide d.              These doc um ents should also be distributed to both the              The analytical approach outlined in this procedure system and event tree analysts to assure                        guide is the result of an evolving process. One consistency in approach and com pleten ess in                  early attempt to formally address the hazards meeting task objectives.                                        associated with the spatial relationships of equipment in a plant was performed as part of the Task 3 - Spatial Interactions                                  Seabrook Probabilistic Safety Assessment (PLG, 1983). The approach has been utilized in man y The objective of this task is to identify potential            subsequent PRAs, such as the assessment of environmental haza rd sc ena rios at the plant. This            environmental hazards at Brookhaven National objective is acc om plished by system atic ally                Laboratorys High Flux Beam Reactor (Ho and identifying hazard sources and potentially                      Johnson, 1994) an d in the Gsgen Probabilistic vulnerable plant e quipm ent. Hazard sc enarios are            Safe ty A sses s m en t ( PL G , 1 99 4) .              T he postulated from the hazard and plant equipment                  methodology outlined here begins by first location inform atio n developed in this tas k. Th is          identifying the sources of hazards and constructing task also includes a screening of the postulated                scenarios arising from those ha zards .                  An hazard scenarios. The scenarios that survive the                alternative methodology can be constructed that is screening proc ess con stitute one o f the k ey inputs          "targe t" based rather than "source" based. The two to the subsequent detailed flood analysis (see                  approaches are conceptua lly sim ilar. Both involve Section 3.5) and fire analysis (see Se ction 3.6).              a system atic sc rutiny of the plan t to id entify The equipment location information is also use d to            hazards and the developm ent of scena rios. The support the assessment of seismic events (see                  target-oriented approach was chosen for the Section 3.7).                                                  NUREG -1150 ana lyses (B ohn and Lam bright, 1990). An exam ple of the applicatio n of this The external events of interest in a PRA can be                app roac h ca n be foun d in Bohn et al. (1990).
generally grouped into two categories: events that are truly external to th e plan t (e.g., seism ic events        This task is accom plished by com pleting five or severe meteorological phenomena) and events                  activities:
that involve internal hazards (e.g., fires and floods) that can sim ulta neously affect nominally separated            1. C olle ctio n  of    p la n t in f o r m a t io n a n d components. The term "environmental hazards" is                      performance of a plant walkdown, used to describe the latter. The primary thrust of              2. Development of a spatial interaction database, the spa tial interac tions a nalysis is to provide a first      3. Identification of potential hazard scenarios, iteration of the identification and quantification of          4. Performance of a preliminary screening of the potential en vironmental hazard scenarios.                          identified scenarios, and How ever, the information developed in the spatial              5. Development of scenario tables.
interactions task also supports the analysis of external events, such as seismic events through                Each of these activities is discussed below.
the identification of the spatial relationships of plant components.                                                    Collection of Plant Information and Performance of a Plant Walkdown It should be recognized that much of this task involves the use of expert knowledge, engineering              The spatial interac tions a nalysis starts by collecting judg m ent, and knowle dge of the interna l events              and organizing all of the relevant plant information.
3-44
: 3. Technical Activities This includes a review of the plant general                      areas or flood zones, may be a useful starting arrangement and technical drawings to collect                    point. The areas or zones defined at this point will information about the plant layout, equipment                    be refined and revised as the analysis continues locations, functions of the equipment, and potential              (i.e., in the fire and flood analyses). Many areas hazard sources. The PRA dependency matrices,                      will likely be shown to be risk insignificant in the system analyses, and event models are also                        subsequent screen ing proce ss. Othe r areas will be desirable sources of in form atio n to help the spatial          of interest only if the hazard prop aga tes to interactions analysts becom e knowledgeable about                adjoining are as. Still, other are as will require the plant systems, intersystem dependencies, the                  subdivision in order to appropriately describe the initiating events, and th e plant response to the                risk scenarios. The im portan t point is that a initiating events.                                                sys tem atic schem e is required at this time that will add ress all loca tions in the plant.
A plant walkdown checklist is developed to help the spatial interactions ana lysts syste m atically item ize          A plant walkdown is conducted to confirm and the information collected during the plant walkdown              augment the information gathered from the and for documenting questions that must be                        documents, to inspect the amount and location of resolved .                                                        poss ible transient haza rds, and to help visua lize the spa tial interac tions o f haza rds with eq uipm ent.
A typical checklist for one zone of the plant wo uld              Photographs, sketches, and notes are often made conta in the zone ID and name, the building name,                to document complex configurations. The plant the PRA and non-PRA systems and/or trains, any                    walkdown team is responsible for identifying all large heat, smo ke, or water sources as well as                  potential hazard sources and the location of other sources and their locations. For the PRA and                equipment of interest throughout the plant. The non-PRA equipment, the vulnerabilities and hazard                equipment of interest is equipment whose failure or sources would be listed. Component separation                    degraded function would lead to a plant transient, wo uld be indicated, and photographs or sketches                  reactor runback or trip, or turbine runback or trip.
attached. For each hazard source, information                    It also includes equipm ent tha t has a role in regarding location, detection, suppression, access,              defining the progression of events following these occupancy, and traffic in the area would be                      types of upset conditions. For convenience, w e provided.                                                        refer to such equipment as PRA-related equ ipm ent, or more succinctly, "PRA equipment."
Sp ecific hazards and haza rd sources are listed in              The team also evaluates the routing of important the discussion of Activity 2. It should be noted that            electrical power, control and instrument cables, and these check lists serve primarily as "notebooks" for              sys tem pip ing. It is important that every plant the analysts, whereas formal documentation of the                location be system atically exam ined to ensure information is made through the databases and                    com pleten ess of the ana lysis.
sc enario tables discussed below. In most cases, it is not necessa ry to com plete the entire checklist            Development of Spatial Interaction Database for a specific location, and a single checklist may be u sed to docum ent several sim ilar locations.                The inform ation a nd re sults from these walkdowns are sorted and catalogued to ensure consistency To prepare fo r the plant wa lkd ow n, a system atic              and traceability th ro ug ho ut th e a na lysis .
schem e to identify locations w ithin the plant is                Databases are then d eveloped to m inim ize the required. As indicated below (in the discussion of                potential for errors and to enhance the flexibility for Activity 4), it is desirable that, at least initially, broad      data retrieva l and s earc hes . It is anticipated that physical boundaries be used to define plant                      existing databas e so ftware is adeq uate . These locations. These locations may be based on                        databases contain the following information:
physical considerations, such as walls and doors, or on physical separa tion distanc es. In general, it
* Iden tification o f locations w ithin the fa cility is desirable to define larger zones in buildings,
* Location of all PRA equipment and related such as the turbine or off-gas buildings, and                          cables and piping sm aller zon es in buildings, s uch as th e auxiliary
* Susce ptibility of equipment, cables, and piping building, the control building, or within conta inm ent.                to hazards Existing informa tion, such as the definition of fire
* Hazard mitigation features 3-45
: 3. Technical Activities
* Hazards associated with equipment, cables,            damage by a fire, caus ing loss of p owe r to and piping                                            equipment or ge nera ting sp urious signals to
* Location of all hazards                                instrumentation and con trol equipment. Th ey are
* Potential hazard propagation pathw ays                not generally susceptible to dam age if they are between locations                                      subm erged by a transient flood, unless electrical
* PRA top events that include the affected              con tacts are exposed. Table 3-12 lists general equ ipm ent.                                          types of equipment that are susceptible to damage if a particular hazard occurs in their location.
These databases are cross linked so that one can            Table 3-13 lists typical hazards that may be created identify, for example, the PRA equipment, the              by a variety of components. The identification of hazards, and the mitigating features for any given          specific hazards in each location will provide the location.                                                  basis for later quantification of the hazard scenarios. Typically, the following categories of The specific PRA -related equipm ent of interest are        plant components are considered as possible those components (and their cables) whose failure,          ignition sources for nuclear power plant fires:
or change of status, may cause an initiating event or may impair the availability of systems required
* Batteries for acc ident prevention and m itigation. T hese
* Battery chargers com pon ents are identified by a thorough review of
* Ca binets (including logic cabinets, relays, the PR A event and system m odels. Passive                        panels, fuses and switches) components, such as check valves, are not
* Cables (including control and power cables) norm ally sus cep tible to fire or other environmental
* Control room equipment hazards but are included in the list to sup port the
* Diesel generators seism ic analysis. Other passive components, such
* Heating, ventilation, and air conditioning as m anual valves and hoses, are of particular                    equipment interest if plant op erato rs are req uired to
* Motor-operated valves m anipulate this equipm ent as part of their
* Motor co ntrol centers emergency response actions. These actions by
* Pum ps a nd c hiller units the operator may be hindered if a hazard (such as
* Air com pressors a fire) is present where this equipment is located.
* Switchgear The equipm ent database also includes power,
* Turbines control, and instrumentation cables that support
* Large transform ers normal and emergency operation of the PRA
* Sm all transform ers components.
* Transient m ate rial.
The types of hazards considered in the spatial              For internal floods, the following spec ific sources interactions analysis include:                              are sought and documented:
* Fire and smoke
* Valves
* Explosion
* Piping
* Flood water
* Tanks
* W ater spray
* Heat exc hangers
* Steam spray
* Drains
* Missiles
* Heating, ventilation, and    air conditioning
* Falling obje cts                                            ductwork.
* Chem ical hazards.
It is also desirable to know the nominal pressure of Equipment in a larg e com plex facility is generally        some com ponents.
exposed to a variety of hazards. The co m pon ents in different systems are susceptible to different          The next activity of the analysis uses the specific hazards, based on the characteristics of          equipment/location databases to correlate the the components, their location, and the types of            sources of specific hazards with the locations of protection features that are available.          For      PRA com pon ents that are susceptible to damage example, electrical cables m ay be s usc eptible to        from those hazards.
3-46
: 3. Technical Activities Tab le 3-12 Equ ipme nt haz ard sus ceptibility Hazard Type  Hazard Description                Equipment Susceptible to Damage in the Designated Area CA      Chem ical Hazards      All active com pon ents ; electrical parts of e quipm ent.
EX      Explosion              All equipment and components.
FO      Falling Ob jects      All equipm ent and com ponents in the path wa y.
FS      Fire and Smoke        All active com pon ents ; electrical parts of e quipm ent.
FW      Flood W ater          All active com ponents that are not w ate rproof and all electrical parts of equipment (not including cables) below wa ter level.
MI      Missiles              All equ ipm ent.
SS      Steam Spray            All active com ponents that are not w ate rproof and all electrical components except for cables.
SW      W ater Spray          All active com ponents that are not w ate rproof and all electrical components except for cables.
3-47
: 3. Technical Activities Table 3-13      Hazards associated with equipment Description                        Associated Hazards*
Air Compressor                                                MI, FS Air H andling U nit                                      FS, FW, SW Air-Operated Valve Ba ttery                                                      FS, EX Battery Charger                                                FS Caustic Piping                                                CA Caustic Storage Tank                                          CA Chiller                                                  MI, SS, FW, SW Concrete Coating                                              FS Co ntro l Ca ble                                              FS Crane                                                          FO Distribution Panel                                            FS Electric Heater                                                FS Electrical Cabinet                                            FS Fan                                                          FS, MI Filter                                                        FS Fire Hoses                                                  FS, SW Flammable Gas                                                EX, FS Heat Exchanger/Cooler                                        FW, SW Heater; e.g., space                                            FS Motor Control Center                                          FS Motor-Driven Pump                                            FS, MI Motor-Operated Valve                                          FS Oil System; e.g., pump or lube                                FS, EX Pneumatic Valve Portable Extinguisher (CO 2)                                    MI Po rtable Exting uish er (W ater)                            MI, SW Po we r Ca ble                                                FS Pressu rized C anis ters                                        MI Propane Generator                                          MI, EX, FS Radiation Monitor Re lay Ca bine ts                                              FS Solenoid Valve                                                FS Sprinklers, Dry Pipe                                        FW, SW Steam Piping                                                  SS Switchgear                                                    FS Transformer                                                  FS, EX Transient Fuel                                                FS W ater Piping                                                FW, SW W ater Tank                                                  FW, SW
            *Defined in Table 3-12 3-48
: 3. Technical Activities Identification of Potential Hazard Scenarios                second criterion ) are exa m ined m ore c arefully to determine the type of initiating event that can The spatial interactions database s are analyzed to          occur. If the initiating event has been evaluated as sort and categorize types and sources of potential          part of the internal events analyses (e.g., reactor hazards in each plant location . Sp ecial atten tion is      trip, loss of fee dw ate r, etc.), no additional analysis focused on all locations that contain PRA                    is necessary to separately quantify the contribution equ ipm ent. However, locations that do not conta in        to plant risk by the external event. The internal PRA equipment are also exam ined if they conta in            initiating event frequency data already account for hazards that may propagate to other locations                the contributions from all observed causes, containing PRA equipment, e.g., flood water that            external and otherwise . However, if the hazard can drains from upper floors to lower elevations in a            cause an initiating event that has not yet been building or causes barrier failure. This activity            considered, the location is retained for m ore defines the scope of the hazard scenarios                    detailed analysis in this portion of the stu dy.
developed for each plant location.
A similar screening approach is used for hazards Perform Preliminary Screening                                that satisfy the fourth criterion (does not cause an initiating event but may damage equipment in one It is often possible to eliminate a large number of          PRA system ). If the hazard can cause equipment locations and hazards from further analysis, based          failures that are alre ady included in the system fau lt on a qualitative examination of the information from        tree models and equipment reliability databases, the preceding activities. This preliminary screening        no ad ditional analysis is necessary to separately analysis considers the follo win g possible impac ts        evaluate these causes for system unavailability.
for each location from each potential hazard.                How ever, if the hazard ca n cause unique failure modes or introduce dependencies that are not
: 1. The hazard and the propagation of the hazard          otherwise evaluated in the system fault trees, the do not cause an initiating event (e.g., a reactor      location is retained for m ore deta iled analysis in trip or a runback demand) and concurrently do          this portion of the stud y.
not dam age any PRA equ ipm ent.
All haza rds that satisfy the third an d fifth screening
: 2. The hazard may cause an initiating event, but          criteria (the hazards can either cause an initiating it does not dam age any PRA equipm ent.                event and im part dam age to at least one PRA system or it may cause damage to multiple PRA
: 3. The hazard m ay cause an initiating event, and        systems, respectively) are retained for the final it may damage equipm ent in one or m ore              activity of the spatial interactions analysis.
systems modeled in the PRA.
At this point in the analysis, preliminary screening
: 4. The hazard does not cause an initiating event,        is based only on the qualitative criteria summ arized but it may damage equipment in one system              above. No qua ntitative information or com parative modeled in the PRA.                                    num erical ana lyses a re ap plied to elim inate locations or hazards from further consideration. If
: 5. The hazard does not cause an initiating event,        there is any question about the applicability of a but it may damage equipment in more than              particular screening criterion, the hazard or location one system modeled in the PRA.                        in question is re tain ed for m ore deta iled analysis in the subsequent activities. Thus, these preliminary All locations a nd h azard s that satisfy the first          screening criteria m ay be applied consiste ntly screening criterion (does not cause an initiating            without the need to reexamine these hazards or event and does not dam age PR A equipm ent) are              locations, even if the numerical results from the eliminated from further consideration in the                risk m odels are later refined.
analysis. W ithin the context defined by the PRA models, these hazards have no measurable impact              The locations that remain after this preliminary on plant risk.                                              screening process are often called "critical locations" or "function al impac t locations." These Locations and hazards that may cause an initiating          locations are defined by a combination of the type event but do not damage PRA equipment (the                  of hazard being examined, the physical plant 3-49
: 3. Technical Activities layout, the types of equipment in each plant area,            regardless of the size, severity, or duration of the and the functional impacts that m ay occur in the            hazard event. This is obviously a very conservative PRA models if the affected equipment is damaged.              assumption for many actual hazards. For example, It is desirable to initially define rather broad              a small fire in a corner of a large room m ay not physical boundaries for each location.            This      damage any equipment a few meters from the provides a m anagea ble num ber of different                  ignition point. However, the application of very locations that mus t be exam ined in the more                conse rvative assumptions is acceptable and detailed activities of the analysis. However, the            desirable in this phase of the ana lysis. This keeps locations must also be defined c ons istently with            the number of individual scenarios within a respect to the possible PRA impacts from each                practica lly man ageable limit, and it facilitates an hazard sce nario. Thus, a particular functional              efficient screening process to ensure that no impact location may include a single room, part of            potentially important scenarios are overlooked.
a room, or a combination of plant areas, and m ore than one hazard scenario may be developed for                In practice, the first pass through a qu antitative each location. A unique designator is assigned to            screening analysis (as described in Sections 3.6 each functional im pac t location to fac ilitate its          and 3.7) typically demonstrates that a large number identification in later phases of the analysis.              of these conservatively defined scen arios are clearly insignificant contributors to plant risk.
Development of Scenario Tables                                These scenarios are documented and are removed from further detailed consideration. A relatively Hazard scenarios are developed for each hazard                sm all number of scenarios may not be eliminated and eac h fun ctiona l imp act loc ation th at survives      during the first application of quantitative screening.
the preliminary screening process. Each h azard              For these sc ena rios, this activity of the analysis sc enario is defined by an impact, or set of impacts,        process marks the point at which successive that may develop if a postulated hazard oc curs              refine m ents are a pplied to redefine the sce nario, to with in the location. In the full context of the PRA          reexamine its impac ts, and to develop m ore m odels, a com plete s cenario always represents a            realistic models for its actual contribution to risk.
class of events that m ay occur in real plant experience. For example, a com plete fire scenario            A unique designator is assigned to each hazard includes an ignition phase, propagation, detection,          scenario. These designators are later us ed in the suppression, damage to PRA equipment, and the                PRA event m odels to identify each internal hazard subsequent sequence of equipment responses and                initiating event. The functional impact location operator actions that result in either safe plant            designators are not used to identify the scenarios shutdown or core dam age. H ow ever, at th is                because m ore than one scenario m ay be activity in the analysis process, each h azard                developed for a particular location, e.g., a fire that scenario is lim ited to identification of the hazard          causes open circuits, a fire that causes short source and documentation of the PRA equipment                circuits, a flood, etc. Each scenario is then that may be affected directly by that hazard.                documented in a scenario table.
To ensure completeness in the more detailed                  If propagation of the hazard scenario is possib le analyses perform ed in later activities, the hazard          between locatio ns (e.g., flood wate r originate s in scenarios are typically defined at a rather general          location A an d pro pag ates to loca tion B), then a level and are a ll encom pas sing. For e xam ple, a          sep arate unique scenario is defined a nd a sep arate fire scenario is defined as "localized" when a ny fire        scenario is constructed.
event that may occur within the functional impact location does not have any adverse impact on                  Table 3-14 illustrates a typical scenario table. In adjacent locations. This fire scenario actu ally              this illustration, each scenario table has a 5-item represe nts a large class of p oss ible fire events that      header followed by nine data entries. The header range from very small fires that may dam age only            describes the loc ation o f the s cen ario.        The one com ponent to a m ajor fire that may dam age all          location description includes the building, the equipment in the location.                                    physical areas included in the scen ario, a short description of the location, and the unique In the spatial interactions analysis, a scenario              designator for the functional impact location. In the always assum es that the identified hazard                    example from Table 3-14, the functional damages all of the PRA equipment in the location, 3-50
: 3. Technical Activities Ta ble 3 -14 Illustration of a typic al scenario table BUILDING                                                        E LOCATION                                                        E-0251 LOCATION NAME                                                    Division 1 Switchgear Room, Elevation 0.0 m LOCATION DESIGNATOR                                              S1 SCENARIO DESIGNATOR                                              FIRES1
: 1. TYPE OF HAZARD SOURCE                                        Switchge ar, Cables, Trans ients
: 2. SCENARIO INITIATION                                          Fire from any hazard source in Item 1
: 3. PATH OF PROPAGATION A. PATH TYPE                                                  None (localized)
B. PROPAGATE TO                                              None
: 4. SCENARIO DESCRIPTION                                          Fire damages Division 1 switchgear
: 5. HAZARD MITIGATION FEATUR ES                                  Detectors
: 6. SCENARIO FREQUENCY                                            3.96 x 10-3 per year
: 7. PRA-RELEVANT EQUIPMENT W ITHIN THE AREA Equipment              Top Event            Equipment Impact BS1-EP                  EP                  Note 1 BS1-BA                  BA                  Note 1 BS1-CA                  BA                  Note 1 BS1-CJ                  BA                  Note 1 BS1-BU                  BU                  Note 1 BS1-EU                  BU                  Note 1 BS1-FU                  BU                  Note 1
: 8. RE TA INE D A FT ER SC RE EN ING AN ALYSIS                    No
: 9. NOTES
: 1. It is assumed that any fire in this area affects the power supplies for all equipment powered from 10 kV bus BA, 6 kV bus BU, and 380 V AC bus EP. The split fraction rules for Top Events B A, B U, and EP have been m odified to fail pow er from these buses for all fires in this area.
3-51
: 3. Technical Activities impact location includes only Room E-0251. Th is              Therefore, according to this practice, most room is the Division 1 switchgear room at                      hazards are designated as localize d within the Elevation 0.0 m of the electrical building. This              defined location. Scenario FIRES1 evaluates location has been assigned the functional impact              a fire confined within the switchgear room.
location des ignator S1 .        However, a single functional impact location may also include a large        4. Scenario Description. This entry provides a num ber o f physical are as in th e plan t.                    brief description of the scenario.
The last header item is the scenario des ignator. It        5. Haza rd Mitigation Fe atu res. T his entry briefly is often helpful to assign designato rs that easily            summ arizes the hazard mitigation features that identify both the particular type of hazard being              are present in the location.            Table 3-15 evaluated and the functional impact location. For              provides a list of typical mitigation features for example, designator FIR ES1 ap plies to a fire event          different types of hazards. The scenario tables sc enario in electrical building location S1. This is          generally sum m arize only automatic detection, especially useful if more than one scenario is                autom atic suppression, and passive mitigation developed fo r a pa rticular location .                        features. Possible manual mitigation features are not generally listed in these tables. Thus, The following nine data entries are included in each          Table 3-14 notes that the switchgear room sc enario table. En tries 1 through 5 and 7 (p artial)        contains fire detectors, but it does not identify are com pleted within this tasks activities.                  the availability of manual fire suppression Entries 6, 7 (partial), 8, and 9 are completed during          equ ipm ent. The effectiveness of these the detailed scena rio analysis ph ase (i.e., the fire        m itiga tio n featu res is not e valua ted and flood analyses).                                          quantitatively during the initial scenario screening process. More information may be
: 1. Type of Hazard Source. This entry docum ents              provided about mitigation features for the hazard sources identified during the initial          scenarios that require detailed quantitative review of plant information and the plant                an alys es of hazard initiation, gro wth ,
walkdown. The m ajor fire hazard sources in              propagation, detection, and mitigation.
the switchgear room , for ex am ple, sh ould include the switchgear, electrical cables, and        6. Sc enario Frequency. This entry lists the mean sm all quantities of transient combustibles that          annual frequency at wh ich the hazard is may be brought into the room during                      expected to occur.          This frequency is maintenance activities.                                  equivalent to the initiating event frequency for the haza rd scenario. It is the total frequency
: 2. Sc enario Initiation. This entry identifies the          for any hazard type being evaluated, specific type of hazard. For scenario FIRES1,            regardless of the hazard severity. Thus, the hazard is a fire.                                    Table 3-14 indicates that the mean frequency for switchgear room fires of any reporta ble size
: 3. Path of Propaga tion. The path for possible              is approxim ate ly 3.96 x 10 -3 fire per room-year, propagation of the haza rd to other locatio ns is        i.e., one fire is expecte d to occur in listed in this entry. A hazard is designated as          Room E-0251 e very 253 years. Alth ough this localized if it does not propagate to other              factor is listed in Table 3-14, the hazard locations. As noted pre viously, most functional          occurrence frequency is actually assessed impact locations are de fined very bro adly to            during the seco nd p has e of the internal plant encompass all possible hazard scenarios                  haza rd analysis. The frequency assessment within the location and to avoid a significant            process is described in Sections 3.6 and 3.7.
pos sibility of propagation between locations.
3-52
: 3. Technical Activities Table 3-15 Typical hazard mitigation types Mitigation Type                      Hazard Types*
Curb                                                        FW Drain                                                      FW Drain Pump                                                  FW Fire Dam per                                                FS Fire D ete cto r (T herm al)                                FS Fire Hoses                                                  FS Missile Shield                                              MI W atertight Door (Blockage)                                FW Nonwatertight Door (Drainage)                              FW Pe desta ls                                                FW Portable Extinguisher (CO 2)                                FS Po rtable Ex ting uisher (D ry Chem ical)                    FS Portable Extinguisher (Othe r)                              FS Radiant Energy Heat Shields                                  FS Sprinklers (Preaction)                                      FS Standpipe                                                    FS S um p                                                    CA, FW S um p Pum p                                              CA, FW Sum p or Roo m Flood Alarm                                  FW W alls (11/2-Hour Rates)                                      FS W alls (Other)                                              FS Yard Fire Hydrant                                            FS
                    *As defined in Table 3-12.
: 7. PRA Equ ipm ent within the Area. This entry                    the functional impact analysis.
lists all PRA equipm ent in th e location . This list is derived from the spatial interactions            A scenario table is developed for every hazard equipment location databases developed in                sc enario that is retained from the preliminary Activity 2 of the analysis. This entry also              qualitative screening process in Activ ity 4 of this identifies the PRA event tree top event for              task. Each table completely describes the defined each com pon ent, and it briefly summ arizes              scenario, the occurrence frequency of the the functional impacts assumed to occ ur if the          scenario, and its specific impacts in the PRA equ ipm ent is d am age d by the haza rd.                models.
: 8. Re tained after Screening Analysis.            The        The risk analysis of environmental hazards is quantitative screening process is described in            con duc ted in at least tw o stages . The first stage, later tasks (see Sections 3.6 and 3.7). This              sc en ar io development, begins wit h th e entry documents whether the potential risk                identification of potential environmental hazards at significance of the scenario is sm all eno ugh to        a broad le vel and ends with an extensive list of justify its elimination from further detailed            hazard scenarios at each location within the plant analysis.                                                that cou ld be p oten tially significan t to risk. This first stage is referred to as a spatial interactions
: 9. Notes. Th is entry includes additional detailed          analysis and is the focus of this task. The second notes that docum ent specific information                stage, the subje ct o f the fire and floo d analyses, about the hazard frequency assessment and                perform s detailed analyses to determine the plant 3-53
: 3. Technical Activities impact frequency, e valuates plant recovery                  Accident Sequence Developm ent. The sequence actions, and assesses the risk significance of the            development task defines the bound ary conditions scenarios. Initially, for screening purposes, the            for the system m odels. The m inimum success sc enario risk analysis applies conservative                  criteria for systems to perform their function are es t im at es for the occurrence frequ ency                  established here. System dependencies must be assessment and plant impact. Upon focusing on                included in the system m odels.
the important scenarios that are retained after screening, the analysis increases th e level of d eta il      Da ta Analysis. The component availability used to considered reducing the conservatism in the                  quan tify the system m ode ls com es from the data original treatment of those scenarios and                    analysis. In some cases, the initiating event requantifying the impact to risk.                            frequenc ies found in the data analysis can come from system m odels.
The pro cess es in the overall environmental hazards risk analysis are inherently counteractive            Human Reliability Analysis. Hum an e rror events and must be balanced in a meaningful practical                are take n into account in the system models, and risk analysis. Ideally, the spatial interactions              the models provide feedback to the HRA.
analysis identifies all potential hazard scenarios regardless of occurrence frequency or potential              Quantification and Results. The Systems Analysis degree of impact on the plant that can cause any              task mus t be completed before the quantification conceivable am ount of da m age. T his would                  and results of the PRA are completed.
ensure that all locations and all possible hazards will be fully e xam ined. On the other hand, to use          Fir e, Flood, and Seismic Analyses. The system available resources m ost efficiently and to                  m odels developed for the internal events PR A w ill m ain tain a proper balance throughout the risk              also serve for the external event analysis, although assessment process, the detailed scenario risk                additional m odels or c onsideratio ns m ay be analysis demands that only relatively risk-                  needed. The effect of fire, flood, or seismic event significant scenarios be evaluate d in detail. T his          scenarios on plant conditions and res ulting subtle "top-down" approach to risk assessment                        inte ractio ns need to be considered when these minimizes the effort in quantifying the risk                  events are including in a PR A. The com pletion of associated with unimportant locations. Therefore,            the Spatial Interaction task is essential before the scenarios identified during the spatial                  proceeding with the fire and flood analysis. Spatial interactions analysis are to be as comprehensive              relationships of plant equip ment is also essential as possible while maintaining a manageable                    for the seismic analysis.
number for the subsequent detailed fire and flood analyses. In practice, experience has shown that              3.2.3.5 References the two stages of the analysis of environmental hazards are somewhat iterative and must be                    Bohn, M. P., et al., "Analysis of Core Damage closely coordinated.                                          Frequency: Surry Powe r Statio n, U nit 1, External Eve nts," NU REG /CR-4550, V ol. 3, Rev. 1, Part 3, 3.2.3.4 Task Interfaces                                      Sandia National Laboratories, December 1990.
Plant Familiarization. This task provides key                Bohn, M. P., and J. A. Lambright, "Procedures for source m aterial for the system m odeling, s ubtle            the External Event Core Damage Frequency and spatial interactions.                                    Analyses for NUREG-1150," NUREG/CR-4840, Sandia National Laboratories, November 1990.
PRA Scope. The systems of concern are those needed to perform the functions modeled in the                Chu, T.-L., et al., Evaluation of Potential Severe PRA. For the Kalinin PRA, this means the                      Accidents During Low Power and Shutdown systems modeled for the full power operatin g                Operations at Surry, Unit 1, Vol. 2, NUREG/CR-state.                                                        6144, Brookhaven National Laboratory, June 199 4.
Initiating Ev ent An alysis. The syste m s analysis can pos sibly identify additiona l initiating events related to a particular system.
3-54
: 3. Technical Activities Drouin, M., et al., Analysis of Core Damage                    3.2.4 Data Analysis Frequency from Internal Events: Methodology Gu idelines , N U REG/CR-4550, Volume 1,                        Da ta analysis consists of three interrelated tasks--
September 1987.                                                  nam ely, determining (1) the frequency of initiating events, (2) component reliability, and (3) comm on-Ericson, D. M., et al., Analysis of Core Damage                cause failure (C CF ) probab ilities. The first of Fr eq ue nc y: Intern al E ve nts M eth od olo gy,              these tasks quantifies the frequency of each group NURE G/CR-4550, Vol. 1, Rev. 1, Sandia National                  of initiating events identified in the task Initiating Laboratories, January 1990.                                      Event Analysis (refer to Section 3.2.1). The second task is to obtain plant-specific estimates of Haasl, D. F., et al., Fault Tre e Hand boo k,                  the unavailability of specific equipm ent. The third N U R E G - 0 4 9 2 , U .S. N u c l e a r R e g u l a to ry      task is to determine the final values to be used in Com mission, January 1981.                                      the parametric models of comm on-cause failures.
Ho, V. S., and D. H. Johnson, "Probabilistic Risk                3.2.4.1 Assumptions and Limitations An alysis of Environmental Hazards at the High Flux Beam R eactor," Final Report, PLG-0975,                    From the point of view of expressing the frequency prepared for Brookhaven National Laboratory,                    of initiating events at a specific plant, the ideal PLG, Inc., April 1994.                                          situation would be if sufficient experience was available from that plant to fulfill all the data IAEA, Insights from PSA Results on the                          analysis needs. The nature of the events of Program mes for Safety Upgrading of W W ER                      interest, howe ver, prevents this from being the NP Ps, W W ER-SC-152, 1996-11-29, limited                      case (and from the point of view of plant distribution, Internationa l Atom ic E nergy Agency,            performance and safe ty, the occurrence of such October 1996.                                                    events is undesirable). Many events of interest (e.g., large loss-of-coolant acc idents [LO CA s]) are NRC, The Use of PRA in Risk-Informed                            not expected to occ ur du ring the life of the plant.
Application s, NURE G-1602, Draft Report for                    Therefore, additional sources (experience from Com ment, June 1997.                                            identical or similar plants and expert knowledge) are nee ded for ac quiring sup plem enta l NRC, Analysis and Evaluation of Operational                    information. Th is additional info rm atio n is merged Data-Annual Report, 1994-FY-95, NURE G-1272,                    in such a way that the combined distribution of Vo l. 9, No. 1, U.S. Nuc lear Regulatory                        plant-specific and generic event data becomes Com mission, July 1996.                                          m ore strongly influ enced by the plant-specific i n fo r m a t i o n a s that evi d e n c e m a t u r e s .
NRC, Precursors to Potential Severe Core                        Incorporation of evidence from additional sites also D a m a g e A c c id e n ts : A S t a tu s R epo rt,            will allow for the variation of the frequency of NURE G/CR-4674, U.S. Nuc lear Regulatory                        events am ong sim ilar plants (i.e., site-to-site Com mission, issued periodically (annually) since                variability). This variability may be the result of 1986.                                                            unique plant features or because of differences in site ch arac teristics , pers onn el, and training.
PLG, "Gsgen Probabilistic Safety As ses sm ent,"
prepared for Kernkraftwerk Gsgen-Dniken AG,                    3.2.4.2 Produ cts PLG-0870, PLG, Inc., February 1994.
The products of the task on determining the PLG, "Seabrook Station Probab ilistic Safe ty                    frequency of initiating events are:
Asses sm ent," PLG-300, prepared for Public Service Com pany of New Hampshire and Yankee
* m aterial for the final rep ort.
Ato m ic Electric Com pany, PLG, Inc., December
* the frequency information in electronic form 1983.                                                                  suitab le for use in the sequence quantification activity.
3-55
: 3. Technical Activities The com ponent reliability task has two products:            3.2.4.3 Task Activities
* a generic component database based on                    Da ta analysis consists of the following three gen eric V VER data should be developed and              interrelated tasks--namely, determining (1) the supplied to the system a nalysis task in sup port        frequency of initiating events, (2) component of fault tree develop m ent. T he g ene ric data        reliab ility, and (3) c omm on-cause failure can also be used in the initial quantification of        probabilities. Atwood (2003) provides additional the event tree sequences.                For final      guidance on the sources of information and quantification of the acc ident sequen ces , a          methods available for estim ating the param eters plant-specific database has to be used.                  used in (1) and (2) above, including quantification of the uncertainties.
* docum entation including descriptions of the sources of g eneric and plant-specific data,            Tas k 1 - Freq uenc y of Initiating Even ts desc ription s of the com ponent failure m odels used, a sum m ary of plant-specific failure              The objective of this tas k is to quantify the current events, a description of the statistical methods        frequency of each group of initiating e vents and software used in estimating failure                  identified in the task Initia ting Event An alysis parameters, and tables of both generic and              (Section 3.2.1). It is desired that the frequencies plant-specific data that can be use d to                be express ed in the form of uncertainty calculate the basic event probabilities used in          distributions and that the determination of the the PRA. Any assumptions made in the                    frequencies take advantage of all relevant analysis, e.g., in interpretin g plant-specific          evidence.
data and their application to estimating failure parameters, should be clearly documented.                The goal of this tas k is to develop a pro babilistic description of the fre que ncy of the initiating events The task o n estima ting com m on-caus e failure              of interest along with supporting d ocu m enta tion.
prob abilities ha s the following pro duc ts:
The objective is to derive an estimate of the
* a    KNPS-sp ec ific    do cu m en t    providin g      current frequen cy for e ach initiating eve nt. As information on the scope of CCF to be                    such, specific cases of data censoring may be modeled including component types and                    both appropriate and desirable. Exam ple s of grouping. It should also identify the CCF                app ropriate da ta censoring are given below; in all param etric models to be used including the              cases, a jus tificatio n fo r censoring is m andatory.
wa ys that it could be incorporated in system fault trees.      The document should be                The original grouping process would have to be distributed am ong all system an d da ta                revised if the plant records provide different or analysts.                                                additional information that indicates the original classification schem e is in error or requires
* KNPS-specific      CCF    rate    including    a      im provem ent. For ex am ple, tripping the m ain descriptio n of approaches used in arriving at          feedwater pum ps b eca use of instrum enta tion those estimates should be documented.                    indicating a high water level in any steam These estimates would be utilized in the first          generator may be listed as a reactor trip due to a phase analysis.                                          high stea m generator level. However, these trips are considered m ore important for the subsequent
* the risk significant CCFs identified through            quantification of a scenario initiated by a loss of initial quantifications and the results of              feedwater transient than simply a reactor trip, sen sitivity and im portance evaluation should          since these trips result in such a condition.
be documented and used for the refined CCF              Therefore, a strong liaison with the analysts that estimates for the second phase analysis and              developed the initiating event grouping is required final quantification.                                    during this tas k. Also, it is im porta nt to realize that accomplishing the objective of this task requires
* the fina l set of CCF rates generated through            an eng ineering perspec tive that is sup porte d, the second phase analysis should be                      rather than led, by a statistician.
documented for use in the final quantification.
3-56
: 3. Technical Activities Many PRAs have assumed that the frequency of                    of "rebinning" the results is required for prac tical initiating events is constant with time. This means            applicatio ns.      It is also poss ible to utilize the events are statistically random occurrences                c o n t in u o u s d i s tr ib u t io n s (e . g ., G a m m a and the distribution of times between occurrences              distributions) to represent the probability of is exponentia l. There can be situa tion s w hen this          frequency data. The G am m a distribution is one assumption may not be valid. One such situation                option and is an attractive cho ice since the upda te is when an im plem ente d plan t change (e.g., a                of a Gamm a distribution also results in a Gam ma modification to plant hardware or procedures)                  distribu tion. The c hoice of the distributions form could prevent, or severely curtail, the recurrence of          will be determined by the analysts preference and an initiator. Past evidence would then not be                  the calculational tools available.
representative of the likelihood this event may occur in the future.          Therefore, it would be            Generally, initiating eve nts c an b e as signed to inapprop riate to includ e this e viden ce in th e plan t-      three distinct categories according to the methods specific database. It would be ina ppro priate to              applied to determine frequency of occurrence:
include the time period prior to the modification in            general transients, transients induced by system the datab ase fo r this initiato r as well.                    failure, and LO CAs (piping failures).
The so-called "learning curve," typically associated            Ge nera l Tran sients with the operation of a new plant, can also influence the rate of occurrence of a particular                The general transient category includes reac tivity initiating event. Changes to plant hardware and                trans ients and hea t rem oval imb alance tra nsients procedures early in plant life can impact the                  as well as small LOCAs and very small LOCAs frequency of initiators. Typically, the first year of          (the latte r would include, for exam ple, primary comm ercial operatio n is excluded from the data in            pum p seal failures).
an attem pt to reduce the influence of a new plant's "learning curve" on the frequency estimations.                  The frequency of occurrence of initiato rs in this category is quantified in a two-step Bayesian Likewise, the analysts m ust detec t any signs of              process. The first step involves combining the increasing initiating event frequencies that co uld            generic evidence (events per year at similar or be due to the aging, or wear out, of plant                    identical pla nts) to arrive at a generic initiating hardware.                                                      event frequency for each initiator group. In the second step , the plant-specific evidence is Plant trip data m ust be ca refully reviewed to                combined with the generic (pop ulation) evide nce to determine if there is evidence of time dependence              arrive at the updated plant-specific initiating event for spe cific initiator type s. Justification is required      frequen cy.
for any censoring of data. Censoring may be valid, for example, if, as indicated above, changes to                Regarding the utilization of generic evidence, plant hard ware or p rocedu res have sign ificantly            much has been written and discussed concerning impacted, or even eliminated, the cause of s pecific            the differe nce s be twee n VV ER -100 0 plan ts and initiators.                                                    VVER-440 plants. There are many differences that can be of significance from a risk assessm ent Ascher and Feingold (1984) provides guidance for                point of view . Notw iths tan ding, it is recomm ended addressing tim e dependence in reliability analyses.            that the VVER -440 experience not be rejected a priori. It is possible, and indeed likely, that the The term "frequency" is used to describe the                    experience from VVER-440 plants yields relevant measurable, or at lea st co nce ptually observable,            data for selected transient initiator categories outcome from experience. Since the outcomes                    (such as loss of condenser vacuum and loss-of-are rarely certain, certainty must be expressed in              offs ite pow er). It is, therefore, recomm ended that terms of pro bab ility. Thus, the likelihood of a              early in the initiating event quantification task each particular class of initiators is expresse d in terms          initiator category be carefully reviewed in the of a probabilistic frequency distribution. These                context of the relevancy of specific VVER-440 distributions can be expressed in several different            experience.
ways. Kap lan (1981 ) des cribes the use of discrete prob ability distribution s.      Com bining discrete distributions is straightforward, although a scheme 3-57
: 3. Technical Activities Transients Induced by System Failures                          una vailability m ode ls. It is important that the component unavailabilities are expressed in the The frequency of occurrence of transients that are            form of un certainty distributions and that similar the res ult of a system failure (such as the failure of        com pon ents be grouped in the same correlation a support system) are determined using fault trees            class. Assigning a group of components to a with the initiating event as the top event (see                correlation class implies that a fully dependent Section 3.2.3).                                                Mo nte Carlo sampling routine would be utilized for the uncertainty evaluation.              Therefore, the Los s-of-Co olant Acc idents                                  unc ertainty distributions for all components in a correlation class sh ould be the sa m e.            The The app roac h tak en to quantify LOCA frequencies            experience data for all sim ilar com pon ents depends on how L OC As are c lassified. If the                belonging to a correlation class could be used for categories are broadly defined (e.g., large,                  the estimation of the uncertainty distribution.
m edium, and small LOCAs), then it may be                      Typically, com ponents of the same type exposed poss ible to apply, after careful review, distributions        to app roximately the s am e en vironm ent, and w ith obtained from previous Western analyses. If, on                sim ilar norm al operating conditions, a re gro uped in the other hand, LO CAs are m ore definitively                  the same correlation class (e.g ., all norm ally defined (e.g., "LO CA 1" is a failure of the 200-m m          ene rgized DC relays).
pipe between Valve 4-29 and 4-53), then an empirical approach can be adopted, such as the                Th e un availability of a component can be thought one formulated in Thom as (1981). The Thomas                  of as the fraction o f time that a compon ent co uld model has been used to express vessel and piping              not m eet its dem and successfully, either because failure rates (for example, see Medhek ar, Ble y,              it is unavailable due to te st o r m ainten ance or it and Gekler, 1993). It should be noted that the                resides in a failed state. Generally speaking, the approach would still require data from VV ERs or              una vailability is the probability that a component other applicable facilities.                                  does not perform its intended function when required, and, therefore, it can also encompass Intersystem (or interfacing) LOCAs involve failure,            the failure prob ability per de m and . This proce dure or    i n a d ve r t en t b re a ch, of a        h i g h-      guide focuses on estimating the following pressure /low-pressure bou nda ry. T he analysis              parameters of equipment unavailabilities:
begins with the systematic identification of all such boundary interfaces. Any available evidence
* Com ponent failure rates expressed in terms of concerning overpressurization (in excess of design                  failure per u nit time or failure on dem and ,
values) of piping at VVER plants will be useful.
* Frequency and duration of corrective Logic m odels m ust be developed for each LOCA                      (unscheduled) maintenance, identified, tak ing into account plant-specific
* Frequency and duration of preven tive features, such as pressure monitoring and test                      (scheduled) maintenance, and procedures. Experience in W estern PRAs has
* Frequency and duration of testing.
shown that potential human errors, associated w ith the testing of valves that are part of the high-              The estimations of the above parameters are pressure /low-pressure bounda ry, are important in            neces sary to evaluate the direct co ntributors to estim atin g occ urrence frequency.                            una vailability from hardware failure, maintenance, and testing . Other con tributors to unavailability Tas k 2 - Co mp onen t Reliability                            resulting from inadvertently leaving a train in an unavailable state after a test or maintenance The objec tive of this tas k is to obtain plant-specific      should be ide ntified and e valua ted jointly with the estimates of the unavailability of specific                    system fault tree (see Section 3.2.3) and hum an equipment used for PRA quantification. The                    reliability analysis (see Section 3.2.5). The general scope of this ta sk is to develop the database                proc ess for this task is:
needed for es timating th e co ntributors to unavailability of the basic events m odeled in                1. Determine the most appropriate level, scope, system fault tree s.        The task also includes                  hardware boundary, and specifications for developing component failure models, collecting                      data collection through coordination with the generic and plant-specific component data, and                      teams that performed system fault trees and estimating the parameters of the com ponent                          event trees, 3-58
: 3. Technical Activities
: 2. Establish the current knowledge on the                      full accident pressu re differe ntial. In this case, param eters to be estimated by aggregating                  special testing for selected MOVs based on the various sources of generic data and the                the ir risk significance are im plem ente d to exp erience o f sim ilar plants ,                          assure their proper operation.                Other examples of incomplete testing are the tests
: 3. Identify the sou rces of p lant-spec ific data to be        that use the mini-flow path of a pump train.
retrieved, reduced, reviewed, and interpreted              Here, the tes t only verifies the proper c losure for the param eters of interest and establish              of the breakers contacts and the operation of the plant-specific data summ ary, and                      the valve stem for the pump discharge valve under a no-flow (static) condition.
: 4. Com bine plant-specific and generic data when appropria te to es tim ate th e needed
* Test-caused failures and hum an errors param eters and to reflect the associated                  resulting in a com ponent or tra in being left in uncertainties.                                              an unavailable sta te after the test are incorporated in the system fault tree model The re are several assumptions and simplifications              through coordination with the hum an re liability that are currently used in state-of-the-art PRAs.                analysis. Som etimes the human error rates Awareness of these assum ptio ns and their                      for such events c an be estim ate d directly as verification to the extent possible is an important              part of a data analysis task and incorporated task in performing PRAs.                                        as part of com ponent una vailability. Care should be taken to as sure that suc h events
* Component failure rates are assumed to be                  are prope rly identified, the hu m an re liability constan t and tim e invariant. T his is a limiting          analyst is consulted, and the fault exposu re assumption that stems from the simplifications              tim e for such failure m ech anism s is se t to a that are typically m ade in PRA quantification              full test interval (rather than one-half test routines. This assumption does not allow the                interval).
modeling of any aging or wear out m echanism , and, therefore, it does not allow
* Uncertainty distributions of the expected proper m ode ling of th e benefits of                      unavailability of a com ponent are typically maintenance and in-service testing in terms of              assumed to be lognormally distributed. This preventing the aging mechanisms.                            assumption, though widely practiced, is not necess ary. The uncertainty distribution for
* Interpretatio n of what cons titutes a failure              component una vailability largely stems from depends on the mission and function of the                  the uncertainties associated with the failure equ ipm ent. Engineering review of the failure              rate of the com ponent. T he uncertainties events are neces sary to decide whether a                  associated with the other parameters in the reported event is indicative of a com ponents              component reliability models, e.g., the average failure occurrence with a predefined boundary.              repair time, are sometimes not accounted for.
This is because of d iffic ulties generally
* Operational testing of a com ponent is typically            encountered using current computer codes.
treated as an ideal test capable of detecting              For example, the Integrated Reliability and every type of failure and failure mode. Since              Risk Analysis System (IRRAS) code does not most of the tests perform ed on the                        allow the analyst to define uncertainties for com pon ents do not simulate actual demand                  both the frequency and duration of conditions, the tests will not be able to detect            unscheduled maintenance. To account for all possible failures and failure m odes. The              both types of uncertainties, the analyst should PRA analyst should review the test procedu re              esti m ate t h e re s u l ti n g u na vaila bilit y and decide whether a test should be credited                contribution and the associated uncertainty for all possible failure m ode s. Motor-operated            outside the IRRAS code and then input the valve (MOV) testing pra ctic e in the U.S. is an            results to IR RA S.
exam ple of an incomplete test. The MOVs are typically tested with a sm aller pressure
* The failure rate of a component in the harsh drop across them than is typically experienced              environment of a n acc ident is usually in actual demands.          The test, therefore,            estimated based on the dete rm inistic c riteria cannot verify if the MOVs will close against the            derived from test results, engineering 3-59
: 3. Technical Activities evaluation, and subjective judgm ents .                  only be detected during the periodic tests. The Exam ples are equipment survivability in a                expe cted time to detection of a failure is referred boiling water reactor building after drywell              to as fault exposure time. For those failure modes failure, the equipment survivability in a steam-          detec tab le by periodic testing, the fault expos ure filled room , or failure of the electrical and            tim e is one-half the periodic test inte rval. If certain electronic equipment in the switchgear room              failure modes can be detected by other activities, after loss of the heating, ventilation , and air          such as a walk through or visual inspection, the conditioning system.                                      fault exposure time would be one-half the inspection interva l. Fin ally, some failure modes
* The failure rate associated with rupture of the          can be detec ted almost instantaneously--for component boundary and pipe rupture is                    example, by alarm or valve position ind icator. In typically estimated based on generic data,                this case, the fault exposure time as soc iated w ith per f orm in g sim ple fracture me chanic                the failure mo de is zero, and the standby calculations, and using sem i-em pirical m odels          component for that failure mode is referred to as a or su bjec tive judgm ent.                                m onitored c om pon ent.
The above assum ptions and limitations are                      Various contributors          to  standby    component inherent in the reliability asse ssm ent o f                    unavailability are:
com pon ents for PRA use. The uncertainties associated with th e com ponent reliability should
* fault exposu re time, i.e., failure during standby reflect the analysts current level of knowledge for
* failure to start or failure on demand the failure mode of concern. The ana lyst may
* failure during m ission tim e initially perform the PRA calculations using crude
* testing conse rvative estimates , followed b y more rigorous
* unsc heduled corrective re pair analyses comm ensurate with the risk importance
* sched uled preventive repair.
of the components.
Table 3-16 provides a summ ary of the formulas to Assessment of the component reliability involves                be use d to estim ate each contributor and identifies modeling and estimation of all the contributors to              the specific parameters to be estimated by component unavailability. For this purpose, the                reliability data analysis. The last column in the com ponents are typically categorized in two                    tab le shows the needed summ ary event data for groups: standby and operating components. The                  the specific plant under stu dy. D ete rm inistic data una vailability models of interest for each group are          from sources, such as plant technical described below , and the spec ific para m eters to            specifications, is not listed in this column. The be estimated in the data analysis task are                      total component unavailability would be the sum of identified.                                                    all its contributors.
Standby Component                                              Operating Component A sta ndby com ponent is a piece of hardw are with              An operating component is a piece of hardwa re a predefined boundary that is norm ally in a state              with a predefined boundary that is normally in an different from the state of its safety function. As            operating state consistent with its safety function.
an exam ple, a norm ally open valve (normal state)              Failure of a n operating com ponent c ould is exp ecte d to close (sta te of its safety function ) in      con tribute to an initiator frequency (see Task 1, certain scenarios. This valve is considered a                  Frequency of Initiating Events). Fa ilure of an standby com pon ent since its norm al and safe ty              operating component after the occurrence of the states are different. A standby component can                  initiator is typically modeled within the system fau lt have many failure modes, some o f which can be                  trees and is the focus of the discussion here. The detected when the com pon ent is in its norm al state          two major contributors to the unavailability of an and others w hen the com ponent is periodically                operating component are:
tested for its safety function. In the earlier example, failure modes, such as the housing                    1. Un availability due to repair: An operating rupture or leakage, could be detected when the                        component may be unavailable as a result of valve is in its norm al state, whereas the valve                      failure prior to an initiator and may remain actuator failure preventing the valve closure can 3-60
: 3. Technical Activities Table 3-1 6 Th e reliability form ulation for the various contributo rs to the unavailability of a standby component Una vailability                Reliability M odel Parameters                      Summ ary Data Needed Contributor                  Fo rm ula Fault exposu re                1-(1-e -8T)/(8T)      8: Standby failure rate                    Num ber of failures and the tim e                          or . (1/2)8T            T: Surveillance interval                  total observation period Failure to start or            Qd                    Q d : Failure to start per                Num ber of start or demand failure on demand                                    demand or failure on demand                failures and the total number of demands Failure to com plete          8R 2                  8 R: Running failure rate                  Num ber of failures and total the mission                                          2: Mission tim e                          operatin g tim e Periodic testing              (J/T p) P r            J: Expected test duration                  Num ber of times the test T p: Periodic test interval                override was needed and the P r: Failure prob ability to              number of times it failed override or recover from the test Unscheduled                    (8+8 D)T R            8 D: The rate of degraded                  Num ber of degraded corrective re pair                                    conditions that require                    conditions and total corrective maintenance                    observa tion tim e T R: Mean repair time                      Duration of corrective maintenance Scheduled                      fm T m                f m: Frequenc y of preventive              Duration of preventive preventive rep air                                    maintenance                                m ainten ance averaged over all T m: Expected duration of                  different types preventive maintenance Notes:
* For monitored failure modes T = 0.                                        probability by one-half of the expected time between the
* For those failure modes detectable by other surveillance                  demands (typically the periodic test interval).
activities (e.g., visual inspection) in addition to periodic
* For those human errors modeled in fault trees which testing, T can be estimated by the total time period                      indicate leaving a train in an inoperable state after test or divided by the number of surveillance activities (periodic                maintenance, the fault exposure time to be used is the full or otherwise).                                                            surveillance interval. The unavailability contributions for
* For those failure modes not detectable by any surveillance                such human errors should be kept separately, and a activities, T should be set equal to the remaining plant                  separate test caused unavailability should be estimated.
lifetime since the last time component was verified
* 8D is estimated similar to the failure rate 8. 8D is the rate operable (e.g., for a new plant with an expected service                  of unscheduled maintenance. It is estimated based on life of 40 years, T = 40 years) and approximate formulae                  the number of times, within the data collection period, that should not be used.                                                        a component underwent repair (corrective unscheduled
* For all other cases T = Tp .                                              maintenance) even though it was not yet failed.
* All failure rates should be expressed in terms of time-              *    (1-Pt ) is the probability of making a component or train related failure rates to the extent possible to assure                    available during a surveillance test if an actual demand consistency.      For some components, such as the                        occurs. In most practical cases, the value of Pt is either emergency diesel generators, component failures are                        zero or one, respectively, indicating that the unavailability divided into standby failure, start failure, and run failure.              due to a test is either easily recoverable or unrecoverable For other components, such as failure of a motor operated                  in time. In those special cases where the available valve to open/close, the generic data is reported as failure              recovery time and the time needed to recover from the probability on demand. Probability of demand failure                      test are comparable, the value Pt should be determined could be translated into the equivalent time-related failure              with help from the human reliability analyst.
rate, if so desired, by dividing the demand failure 3-61
: 3. Technical Activities unavailable after the occurrence of the initiator.        component down time during testing and This una vailability could be s imply estim ated          maintenance.          Information on compone nt using the following equation:                            performance in respon se to a test or a demand should be interpreted or categorized as failure, Q R = (8 R T R)/(1+8 R T R)                  degraded, or success . Fa ilure encom pass es all events that render the component either outside where 8 R , and T R are defined in Table 3-16.            the accepta ble envelope of the technical No te that all causes for perform ing corrective          specifications or within the PRA definition of the and preventive m ainten ance are included in              failure and the failure modes of the component estimating the rate 8 R .                                under study. Degradation encompasses those events that indicate that the component is not in a
: 2. Un availability due to failure during the mission        failed state; h ow ever, it co uld fail e ventu ally if it is time afte r the occu rrence o f the initiator. This      not repa ired. G ene rally, all unsche duled repairs una vailability could be simply estimated using          triggered by unsatisfactory perform ance of the the following equation:                                  component but not by its failure are categorized as deg rada tions. Som e PR A data evaluations have Q M = (8 T M)                          broken down the degradations into degraded and incipient conditions depending on the severity of Here, 8 is the actual failure rate of the                the fau lt and the available time before the condition operating component and does not include any              propagates to a failure. An othe r area of d ata degraded conditions, and T M is the expected              analysis that may require extens ive interpretation m ission time as soc iated w ith the com pon ent.        deals with com ponent recovery pro bability. A component m ay be m ade available during certain All contributors to component unavailability for both          testing pro cedures if an actual demand occ urs. A standby and operating com ponents could be                    failed component could also be made available for subjected to recovery action if su ffic ient tim e is          certain failure modes. Such recovery actions available for returning the component to an                    typic ally require m anu al actions (e .g., realignment operational state. As an example, there could be              of a suction path or manual sta rt of a pum p).
up to several hours available before a room                    These pro babilities for rec overy action s should containing safety equipment heats up to a critical            alw ays be reviewed by hum an reliability analysts, tem perature after loss of a cooling fan. The                  even if in some cases the probabilities could be prob ability of successful recovery actions either by          estimated based on the experience data.
repa iring the affected com pon ents or by providing          Generally, interpretation of collected data is a m ulti-an alternate mea ns for performing the needed                  disciplinary task that requires close cooperation function should be typically modeled at an accident            between PR A da ta analysts, PRA system analysts, sequence or accident minimal cutset level after the            PRA human factor specialists, and plant operation event trees without recovery are quantified.                  and m ainten anc e staff.
Pla nt-Sp ecific Data Collection, Interpretation, and          Methods for Estimation Evaluation Various parameters derived from the component Past experience with PRA data collection activities            reliability models are identified for both standby and has shown that no single data source in the plant is          operating components.              Some of these sufficient to provide all the needed information.              parameters, such as periodic test interval and the PRA practitioners had to search through various                preventive maintenance frequency, could be sou rces of d ata to properly identify an d interp ret a      obtained directly from plant-specific procedures single record.        Plant design documentation,              and technical spec ifications.        These types of operator logs, ma intenance records, plant technical          param eters typically are not statistical in nature and specifications, an d s urveillance procedures                  are treated as deterministic information. The con stitute the m inim um set of info rm atio n typically      remainder of the param eters, such as c orrective examined for determ ining the data needs for use in            maintenance rate, are statistical in nature and a PRA. Event data of interest for component                    should be estim ated based on plant-specific and reliability evaluation are (1 ) inform ation re lating to      generic data sources. Cu rrently, B ayesian analysis component perform ance in response to a test or an            is widely acce pted as the es timation m etho d. The actual dem and and (2) inform ation re lating to              single-stage Bayesian approach is comm only used 3-62
: 3. Technical Activities for estimating the parameters for component                    Events. However, these likelihood functions are reliability m ode ls when the ge neric reliability            not appropriate for Ba yesian updating of the database provides the estimates of the param eters            distribution for the repa ir duration. Here, the of the prior distribution. The two-stage Bayesian              likelihood m ay simply be a non-reducible, joint-approach could be utilized when the generic                    prob ability distribution for repair durations database con tains s um m ary data for o ther p lants          observed, sometimes referred to as sampling (e.g., number of failures and the observation                  likelihood. Since this likelihood is not incorporated period). The theoretical basis for the Bayesian                in the widely used Bayesian codes, the analyst may approach and fo rm ulation and som e available                decide not to u se the Bayesian approach in software has been extensively discussed in the                determining the mean repair distribution especially open literature, e.g., Apostolakis et al., 1980 and            since the uncertain ties associated with m ean re pair Apostolakis, 1982.        The following provides a            tim e are not comm only accounted for in the PRA.
discussion on the single-stage Bayesian approach.              In summ ary, the likelihood function should, to the For the two-stage Bayesian routine, the task on                extent possible, reflect the process through which initiating event frequency may be consulted.                  the data was generated and collected.
Prior Distribution                                            Posterior Distribution The Bayesian approach requires the use of a prior              The comm onl y used B ayesi an soft ware distributio n for the parameters to be estimated.              autom atic ally generates a posterior distribution and Prior distributions are typically obtained from                typic ally outputs the assoc iated param eters of a industry-wide data ana lyses. In s om e ca ses , a            fitted lognormal distribution. An examination of the prior distribution is generated from the failure rate          posterior distribution by the analyst s hould be done estimates reported in past PRAs. In this situation,            to assure its appropriateness. This is typica lly the analyst should combine the data from several              done in three steps. In the first step, the posterior PRA sources to arrive at one single prior                      distribution is compared with the prior distribution.
distribution rep resentin g plant-to-plant variability.        If the mean and variance of the prio r are distin ctly The re are several different ways suggeste d in the            different from that of the posterior distribution (a past for combining m ultiple distributions to develop          factor of 2 or m ore), the n the analyst s hould verify a generic prior distribution (G entillon, 1987 ; Ma rtz        that the data shows strong evidenc e. Fo r data to and Bryson, 1984; and A zarm and Ch u, 1991). A                strongly affect both the mean and the unce rtainty of method typically used to arrive at a generic prior            the posterior dis tributio n (i.e., c onsid ered to be distribution is by constructing a mixture distribution        strong evidence), the data should contain at least from all sources. The weights a ss ociate d with              three independent observations. In the second different sources are typically the same as long as            step, the analyst sh ould check the evidence data to all the sources are applicable to the type,                    make sure that the data is not strongly affected by boundary, and the failure mode of the component                the failures of on e co m pon ent in the gro up. In under stu dy. In some cases, different weights are            som e cases, a com ponent failure m ay not have assigned depending on the extent to which the                  been diagnosed properly and the repair was generic sources represent the basic event under                incomplete, thereby making the same com ponent stu dy. A different method to assure that the                  fail several times within a short period of time.
resulting generic distribution has a wide enough              Such clustered data should be detected and unc ertainty to reflect faithfully differences am ong all      resolved. In the third step , the analyst sh ould the sources is reported (Azarm and Ch u, 1991).                assure the adequacy of a lognormal fit to the The cho ice of m ethod to use is up to the analyst;            posterior distribution. The reader should note that howeve r, the analyst should examine the                      the use of a lognormal distribution is not essential constructed gen eric distribution to see if it does            when using the IRRAS code even though it has cover all the means reported by various sources                been widely practiced in the past. Some posterior within its 5th and 95th percentiles .                          distributions may not resem ble a lognormal distribution; therefore, the fitted lognormal Likelihood                                                    distributio n based on matching the first two mom ents may not be appropriate. In such cases, The Poisson and Binom ial likelihoods for failure              a more appropriate fit may be obtained by rate per hour and failu re rate per dem and are                conserving the mean and the 95th percentile of the discussed for the task Frequency of initiating                distribution rather than the mean and variance.
3-63
: 3. Technical Activities Also, special care should be given to those cases            analysis performed to evalu ate external event when trying to use the Bayesian approa ch with zero          PRAs, the formal modeling used to directly address failure as the evidence. U pdatin g of the generic            loss of the heating, ventilation, and air conditioning failure rate w ith the evidence of zero failure is not        system (either as an initiator or as a part of a typic ally recomm ended unless the observation                system fau lt tree), and the explicit m odeling period is at least tw ice the exp ecte d m ean time to        employed to quantify pre- and post-initiator human failure derived from gen eric prior.                          error rates eliminated the need to distinguish Categories 1, 2, and 3.            Furthermore, the Task 3 - Com mon -Cause Failure Probabilities                prob ability of C CF c an be red uced significantly once certain CC F failure mec hanism s are The objective of this task is to determine the final          observed and sub seq uen t corrective actions are values to be used in the param etric models of                taken, as, for example, in Categories 4 and 5.
comm on-cause failure s (CCFs ).          T his would        W hen design/installation problems and /or involve addressing a variety of issues starting with          procedural deficiencies are detected, corrective defining what should be considered as CCFs, how              actions are usually put in place to rectify the they sho uld be m ode led in the context of system            problems to the extent p ossible. Finally, some of fault trees, and finally how they are to be estimated        the sn ea k c ircuits          an d  un exp ecte d using generic and plant-specific (Kalinin-specific)          interdependencies could be identified while in the data.                                                        process of conducting a relatively detailed PRA.
Consequently, CC F estim ates have changed over The re are generally two major limitations                    tim e as PRAs increased in scope and level of associated with the modeling of CCFs in a PRA.                detail. Therefore, C CF estim ates are o nly used to One limitation dea ls with whether the identification        capture those events that are not explicitly modeled of CCFs is adequate to assure that the modeled                in PRAs. The more the scope and level of d eta il in CCFs are com prehensive but not duplicative, and              a PRA, the less would be the number of dependent the other limitation deals with the applicability of the      events not ex plicitly accounted for in the PRA.
CCF generic data to the specific plant being                  Also, som e have argued that the CCF estimates stud ied.                                                    should also capture and compensate for the inadequacies inherent in simplified PRA The definition of C CFs is interrelate d with the            quantification algorithms (see Azarm et al., 1993).
scope and the level of detail in the PRA. For                PRAs perform ed in the U .S. typically use generic example, in the early eighties when PRAs were of              data on CCFs, at least initially. However, even for limited scope, an event would have been                      this initial use, the generic data must be tailored for categorized as CC F if m ore th an o ne fa ilure du e to      the specific plant. This is typically done by any of the following causes was observed:                    m apping the industry-wide events (data) against the scope of the PRA, its le vel of detail, and the
* fire, flood, seismic, or any other exte rnal event,      current plant practices in orde r to identify and use
* high tem pera ture, such as loss of heating,            the subset of the events that are m ost applica ble to ventilation, and air conditioning system,                the plant. Recently, a published six-volume report
* pre- and post-initiator human errors disabling          by the U.S. Nuclear Regulatory Comm ission on multiple components,                                    CCF (Strom berg , 1995) provide s a c om pute rized
* design and installation problems, e.g., wrong            database of the latest U.S. study on generic CCF materials,                                              estimates.
* procedural problems,
* aging an d we ar ou t,                                  It is recom m end ed that CCF modeling be
* tem porary degradation of co m pon ents due to          performed in two phases. For the first phase, CCF such causes as improper maintenance and                  probabilities are to be estimated based on the surveillance, and                                        applicable industry-wide CCF events. The plant
* sneak        c i rc u i ts and    unexpecte d          m odels then should be quantified, and the major interdependencies.                                      CCF contributors identified. For those CCF events which significantly contribute to plant risk, further How ever, as the scope, modeling complexities,                analysis is needed to justify that the CCF estimates and the level of detail in PRAs increased,                    are app ropriate. The results of these analyses characterization of CCF m atured allowing them to            should be explicitly discussed with plant staff and be m odeled m ore explicitly. For example, the                regulators for identification of potential corrective 3-64
: 3. Technical Activities actions. This would constitute the second phase
* CCF considerations for plant-s pec ific data analysis. The final estimates including the impact                  collection, and of any potential corrective actions on the CCF rates
* Estimation of the CCF contributors.
should be used for final quantification.
Sources of Generic Data Activity 1 - Generic Data The databas e for the C CF events developed in the The sources of generic data are identified and the              U.S. (reported in Stromberg, 1995) should be used associated CC F events are reviewed to verify                  as one of the data sources. Th e event data should app licability to the s pec ific plant, i.e., establishing      be reviewed and those events that are either generic data which is tailored for the Kalinin                  duplicative (due to scope and level of effort in the Nuclear P ower Station (KNP S).                                KNPS PR A) or a re not applicable (du e to specific features of KNPS) should be discarded. New CCF Activity 2 - CCF Rules                                          rates sho uld be estim ated with the remainder of the CCF events. Ho we ver, in som e generic sources of The CCF rules for component types and                          data, the event description may not be available or component grouping within and across systems                    summ arized so that its applicability to a specific are com m unicated to system m odelers to assure                plant m ay not b e verifiable. In these cas es, a consistency in modeling.                                        certain degree of su bjec tivity or conservatism m ay be applied. Ad ditional data for CC F n ot c urrently Activity 3 - P lant-S pec ific Data                            included in the Idaho National Engineering Laboratory repo rt (Strom berg , 1995), e.g., data on Pla nt-specific data indicative of potential CCF                instrumentation and control components, relays, occurrences are collected.            A potential CCF          transducers, is provided in Appendix A.
involves occurrence of m ultiple failures that are suspected to have been caused by CCF triggering                Component Types for CCFs mechanisms. Th e corrective actio ns which could poss ibly eliminate the triggering m echan isms are            Volume 6 of the Idaho National Engineering not given credit at th is stage. A Bayesian rou tine is        Laboratory rep ort sp ecifically identifies various used for updating the CCF parameters.                          com pone nts for which CC F estim ates were determined. However, the component types are Activity 4 - Initial Quantification                            categorized based on systems in U.S. pressurized water reac tors a nd b oiling wa ter rea ctors , e.g.,
Initial quantification and the asso ciated sen sitivity        pumps in the Service W ate r Syste m . Generic and importa nce evaluations are perform ed to                  component types, s uch as M OV s, witho ut any identify those CCF events that are risk significant.            further categorizations based on systems or any other feature could be sufficient for most CCF Activity 5 - Final Quantification                              modeling applications. Further classifications of MOVs (for exam ple, to differentiate low-pressure or Detailed analysis, either qualitative or quantitative,          high-pressure applications) should only be whichever is more appropriate, is c ond ucte d to              performed if supported by data. Appropriate data adjust the baseline estimates of the risk significant          searches and CCF estimations should be CCFs.                                                          performed using the database structure in the reference cited to assess whether the CCF Guidance is provided below for the following                    estimates significantly change if MOV s are further specific areas:                                                categorized by low-pressure or high-press ure application. It is also recomm ended that the
* Sources of generic data,                                  number of co m pon ent type s sh ould be k ept as
* Com ponent types for CCFs,                                sm all as possible to make the estimates
* Failure modes for CCFs,                                    manageable. The breakdown of a component type
* Cause considerations for CCFs,                            based on environm ent, size, and stres s (e.g .,
* Com ponent grouping rule for CCFs within a                pressure) should not be done unless justified by system,                                                    the data. Several different CCF estimates could be
* Com ponent grouping rule for CCFs across                  obtained generically for a component type for system s,                                                  different failure modes, initial conditions, and given 3-65
: 3. Technical Activities service app lications. These considerations are              Cause Considerations for CCFs som e of the bases for the C CF g rouping that are discussed under Component Grouping Rule for                  To develop a complete understanding of the CCFs W ithin a System and Com ponent Grouping                pote ntial for m ultiple failure s, it is nec ess ary to Rule for CCFs Across Systems.                                identify the reaso ns w hy thes e types of failures occurred. Understanding the causes of the CCFs Failure Modes for CCFs                                        is im portant in evaluating both the event data and p r o p o s e d plant de fe ns es ag ain s t C C F Various component failure modes should be                    occurrences. Cause classificatio ns pro posed in differentiated in CCF mod eling when different                Volume 2 of the Idaho National Engineering failure modes result in different consequences.              Laboratory report could generally be used.
For example, two different failure modes, failure to          Furthermore, the examples pro vided in this volume open and failure to control (stuck in an inte rm ediate      are c o nstructive in ass u r in g c o n s is t e nt position), m ay be considered for a standby control          understanding of cause classification for CCFs.
valve. If these tw o different failure m odes res ult in different consequences (in terms of system or plant          Component Grouping Rule for CCFs W ithin a respons es), the failures s hou ld be k ept sepa rate        System and the C CF data sho uld be differe ntiated .
A set of components within a system that could be represented by a comm on-cause group are discussed using the following simple one-line diagram (Figure 3.5).
All six valves in s uction and discharge may be              wo uld be different in these two cases. The latter considered as a C CF g roup. In th is case, s pecific        wo uld typically re sult in a lower system Fig ure 3.5 Simple e xam ple for C CF ana lysis combinations of m ultiple (three or more) failures            una vailability estimate for the same combinations are considered to res ult in system failure.                  of basic events. Therefore, rules should be How ever, the discharge valves are located inside            provided to assure proper grouping of CCF con tainm ent, and they are neither tested sim ilar to        components, thereby preve nting p oten tial nor as frequently as the suction valves. Hence, the          underestimation of system unavailabilities. Since analyst should consider two CCF groups: one for              there are no step-by-step rules that can be written valves V1A, V2A, and V3A and the other for                    for prescribing how to group components for CCF, valves V1B, V2B, and V3B. The contribution of the            only general guidance can be provided to assist the CCF, and consequently the syste m unavailability,            analysts. A minimum set of considerations that 3-66
: 3. Technical Activities could be used by the analysts for component                    Rule for CCFs W ithin A Sys tem , the analyst sh ould grouping for CCFs are:                                        identify those component groups across system s for which CCF modeling need be considered.
* types of componen ts with so m e reg ard a s to          Since an across-system CCF group may involve a their ap plication , size, fun ction, e tc.,              large number of components, the CC F p aram etric
* the normal operational state and the failure              modeling can become unm anageable.                  The m ode of the com pon ent,                                number of com binations to be used in CCF
* the operational activities, such as tests and            param etric modeling should be limited.              For maintenance, and their ass oc ia ted                      example, if the multiple Greek letter model is used, frequencies, and                                          factors for five components will be applied to all
* sim ilar location an d ex pos ure e nviron m ent.        com pon ents in the group (if five fails all fails).
It is also recom m ended that like co m pon ents              CCF Considerations          for  P lant-S pec ific Data produced by different manufacturers do not                    Collection necess arily imply that the com pon ents belon g to separate CCF groups. Similar components from                  The system an alyst sh ould provide to the da ta CCF gro ups only if the following two conditions are          analyst the list of components in the CCF groups m et:                                                          for data collection and interpretation. W henever a component from a CCF group has failed, a da ta
: 1. The components do not belong to a natural or              field in the data shee t (to be filled in by data to a logical redundancy, as do valves V1A,                ana lyst) should indicate a request for inform ation V2A, and V3A in the above exam ple. There is              on simultaneous failures of sim ilar com pon ents or no justification to have separate groupings for          recent failures that have oc curred over a s hort these valves if one of the valves was                    period of time.      The following definitions for manufactured by Company XYZ, for example,                simultaneous and recent failures are suggested:
and the other two were not. However, if the discharge valves V1B, V2B, and V3B are from              1. For sequentially tested, standby components, Com pany XYZ and the suction valves are n ot,                  simultaneous failu res are defined as failures then there might be some justification for                    that have occurred within a time period less different group s, if the n ext c ond ition is m et.          than one test interval.              For standby com pon ents that are tested in a staggered
: 2. The industry data should indicate that                        fashion, sim ultaneous failures are those that manufacturing and design specifications were                  have occurred in less than on e-half the te st the major contributors to the CCF estimates.                  interval. For operating com ponents failures In th is case, se parate grouping could be used                that have occurred within the PRA mission if additional engineering justifications can be                time are considered as simultaneous failures.
provided to show that the components from different manufacturers exhibit different CCF            2. Recent failures are defined as failures that characteristics.                                              have occurred in a time period that is less than one failure time. To calculate the failure time, Dividing the CCF grouping based on the                              the generic mean time between the failures of manufacturer should be a last resort and should be                  the com ponent should be divided by the avoided to the extent possible.                                    number of the components in the group. As an example, if there are five components in the Component Grouping Rule for CCFs Across                            group and the generic failure rate for the Systems                                                            component is 1.0 x 10 -4 per hour (or the mean tim e between failures is 1.0 x 104 hours), the Across-system CCFs are not typic ally m odeled in                  recent period would be 2000 hours (or U.S . PRAs. However, the analysts should be                        approxim ate ly about three months). If similar aware that although this type of CCF g rouping is                  failures on this com ponent grou p have possible, it should not be formed by artificial logical            occurred over a thre e-m onth time pe riod or boundaries m ade as a res ult of fault tree modeling.              less, these failu re histories should be queried Rather, it is recomm ended that the final accident                  for possible common-cause connotations.
sequence m inim al cuts ets be reviewed, and based on the criteria provided in Com ponent Grouping                The system ana lyst and the data analyst s hould 3-67
: 3. Technical Activities work closely together to ensure that the da ta                  model parameters based on plant-s pec ific data queries will capture the requisite inform ation                when pos sible and to use the weighted average of needed for parametric estimation of CCFs.                      plant-specific and generic data. The weighting factor would be subjective depending on the Estimation of the CCF Contributors                              analysts confidence in generic vs. plant-specific data. The final aggregate results for the CCF Currently, there are four types of methods that                param eters should conserve the cons traints could be utilized for estimating the CCF rates. Two            imposed by the specific CCF m odel used.
of these m eth ods are typically used in early stages of the analysis (Phase 1), whereas the other two                In the Phase 2 evaluatio n, th e C CF e stim ate s could m et hods are typically done after initia l                    be adjusted based on qualitative reasoning on the quantification (Phase 2). In Phase 1, the actual                current plant practices in the areas of defenses CCF events from a generic database are reviewed                against CCFs including the corrective actions and evaluated against the specific features of the              proposed by the plant. Methods reported by plant design, the current plant practices, and the              Bourne et al. (1981) and by Hum pherys (1987a, PRA. This allows the user to specialize events for              1987b) are candidates for this type of analysis.
application to a specific pla nt by assigning an                Qua ntitative analyses could also be perform ed in app licability factor to each e vent. The ap plicab ility      the Phase 2 evaluatio n based on failu re tim e factor is a value between zero and one. The higher              statistics. In this regard, plant-specific data on the applicability factor, the m ore relevant the event          times of com pone nt failures in the CCF group wo uld be to th e specific plant being studied. There          should be collected including any simultaneous are som e degrees of subje ctivity involved in                  failures. Since it is not expected that m uch data on assigning an applicability factor. To use the                  m ultiple sim ultane ous failures is to be found for use estimation m ethodology of Stromberg (1995), an                in the Kalinin PRA, reliance on predicting CCF event-by-event assessment is required to                        probabilities based o n statistical correlation of determine the values for three classes of                      failure times (clustering) would be the only option.
applicability factors.        These are R1, Cause              A method for performing such analysis based on Applicability Fac tor; R2, Coup ling Ap plicab ility            clustering of failure times is described in Factor; and R3, Failure Mo del Applica bility Factor.          Azarm et al. (1993).
The re are some discussions on the assignment of thes e ap plicab ility facto rs in M osleh et al. (1989 ).      3.2.4.4 Task Interfaces The second type of analysis that could be                      The task on determining the frequency of initiating performed deals with the use of plant-specific CCF              events has the following interfaces:
events. Updating of ge neric estim ates with plant-specific CCF data would be performed for those
* it requires input from the Initiating Event cases where multiple simultaneous failures have                      An alysis and provides output neces sary for the occ urred an d are sus pec ted to have been caused                  Initial and Final Quantification of Accident by CCF m echanisms. The Bayesian update of the                      Seque nce s.
CCF m ode l param eters is gen erally not a
* a more subtle interface is found with the task straightforward procedure (except for some                          System Mo deling. System logic models may specific CCF m odels, such as the g lobal Beta                      be necess ary to quantify specific initiators, factor model) and could involve extensive                            such as loss of a support system.
computations.          The re are two alternative
* the grouping of the individual initiators based approaches that co uld be pursued fo r pla nt-specific              on the expected plant response is performed updating of generic data. One approach is to treat                  as part of the task Initiating Event Analysis.
plant-specific data as a part of specialized generic                Each group includes a number of initiators that data and to select the value of one for the                          have similar responses for the plant systems app licability factor. The impact of the plant-specific              and ope rators.      It is im porta nt that the data in this approach would depend on the size and                  understanding of the rationale used in the qua lity of gene ric data (e.g., number of CCFs and                  grouping process be carried over to the number of demands in the generic database). The                      pres ent task.
higher the quality of the specialized generic data, the less would be the impact of plant-specific data.            The component reliability task has the following The other alternative could be to estimate the CCF              interfaces:
3-68
: 3. Technical Activities Plant Familiarization. The iden tification o f plant-              potential source for obtaining estimates of CCF specific data sources for estimating component                    and the use of CCF generic data also establish failure param eters is initiated as a part of this task.          a strong link between this task and the task In the current task, the plant-specific data are                  Co m pon ent R eliability.
collecte d and used in com binatio n with generic
* the estimated CCF param eters are then used data to estimate the component failure parameters.                in the initial and final quantifications and sen sitivity evaluations.      The types of System Modeling. The output of the current task                    interactions expected from this task to other provides input to the task System M odeling.                      interrelated tasks are not simply in the form of During the preliminary develo pment of system                      input/output, rather it involves two-way models, generic component data is usually                          interactions. As an example, the initial adequate. The c om ponent failure param eters                      quantification task uses the generic CCF estimated using plant-specific data have to be                    param eters as input; however, this tas k w ill provided before the system fault trees can be                      identify important CCF groups for which m ore finalized. The level at which da ta analyses are to                detailed CCF analysis and estimation would be be performed (component, train, etc.) for various                  needed. Similarly, this task would describe una vailability contributors, the boundary of the                  specific guidelines for component grouping for equ ipm ent, and the associated failure modes                      modeling of CCF events which will be used in should be coordinated between these two tasks                      the system fault trees and for which this task (System Mod eling and Com ponent R eliability).                    would estimate CCF parameters.
Frequency of Initiating E ven ts.            Estimation      3.2.4.5 References t e c hniques u s ed f o r c o m p o n e n t fa i lu re una vailability contributors are similar to those for        Apostolakis, G., D ata An alys is in Ris k initiating event freq uen cies. Consistency in the            Asses sm ents , Nuclear Engineering and Design, methods and software used should be maintained.              71, pp. 375-381, 1982.
The impac t of initiating events on the un availability of some basic events may be determined using                  Apostolakis, G., et al., "D ata Specialization for data analysis--for example, the proba bility of loss-        Plant-Specific R isk S tudies ," Nuclear Engineering of-offsite power after a generator trip.                      and Design, 56, pp. 321-329, 1980.
Comm on-Cause Failure Probabilities. The m ethod              Ascher, H., an d H. Feingold, Repairable Systems and software used in estimating initiating event              Re liability, Marcel Dekker, Inc., New York, 1984.
frequency and estim ating com m on-caus e failure probabilities sho uld be con sistent. Th e plan t-            Atwood, C., et al., Handbook of Parameter spe cific database developed in the current task              Estimation for Probabilistic R isk A sse ssm ent, could be used for estim atin g the plant-specific            NU REG /CR-6823, Sandia National Laboratories, comm on-cause failure probability estimation.                September 2003.
Initial Quantification of Accident Sequences.                Azarm , M. A., et al., Methods for Dependency Com ponent failure parameters, by providing input            Estimation and System Unavailability Evaluation to system m odeling, are indirect input needed for            Based on Failure Data Statistics, NUREG/CR-qua ntification of ac cident seque nce s.                    5993, Vols. 1 and 2, Brookhaven National Laboratory, July 1993.
The task rela ted to determining comm on-cause failure (CCF) probabilities has the following                Azarm , M. A., and T.-L. Chu, On Combining the interfaces:                                                  G eneric Failure Data for Probabilistic Risk Asses sm ent, Proceedings of the International
* as discussed earlier, there is an explicit            Conference on Probabilistic Safety Assessment relationship between CCF m odeling and the            and Ma nag em ent (P SAM), Feb ruary 4-7, 19 91.
scope/level of d eta il in the PRA. There is also direct interaction between this task and the          Bourne , A. J., et al., Defenses Against Com mon-task System Modeling in the area of grouping          Mode Failures in Redundancy Systems, and m ode ling of the CCF com pon ents .              SR D-R 196 , Safety Reliability Directorate, January
* the analysis of plant-specific data as a              1981.
3-69
: 3. Technical Activities Gentillon, C. D., Aggregation Methods for                    3.2.5 Human Reliability Analysis Com ponent Failure Data in the Nuclear Com puterized Library for Assessing Reactor                  The objectives of the hum an relia bility analysis Re liability, E G G -REQ-7775, Idaho National                (HRA) task are to identify, analyze, and qua ntify Engineering Laboratory, 1987.                                human failure events (HFEs), the PRA event tree/fault tree model basic events involving human Hum pherys, P., et al., Design Defenses Against              actions. These overall objectives can be clarified Multiple Related Failures, Advanced Seminar on              by considering two distinct cases:
Com mon-Cause Failure Analysis in Probabilistic Safety Ass ess m ent, Kluwer Academic Publication,            1. Pre-Initiating Event HFE s. This tas k is to edited by A. Amendo la, pp. 47-57, IS PR A, Italy,                quantify pre-initiating event HFEs.
November 16-19, 1987a.
: 2. Post-Initiating Event HFE s.              Many po st-Hum pherys, P., et al., Analysis Procedures for                  initiating event errors of omission will have Identification of M ultiple Related Failure s,                    been identified during the Event Sequence Advanced Seminar on Comm on Cause Failure                          Modeling and Syste m s A nalysis tas ks . This An alysis in Probab ilistic Safe ty Assess m ent,                  task must extend that list and perform the Kluwer Aca dem ic Publication , edited by A.                      following ac tivities:
Am endola, pp. 113-129, ISPRA, Italy, November 16-1 9, 1987b .
* Identify the spec ific uns afe acts (UAs) and context associated with each identified Kaplan, S., "On the M etho d of D iscre te Pro bab ility                HFE, Distributions in R isk and R eliability Calculations--
* Qua ntify the chance of each HF E, i.e., the Application to Se ism ic Risk A sse ssm ent," Risk                      prob ability of the HFE given the defined An alysis, 1, pp. 1 89-1 96, 1981 .                                      con text,
* Identify and quantify the probability of Ma rtz, H. F., and M. C. Bryson, A Statistical Model                    human recovery for significant sequences, for Com bining Biases in Expert Opinions, IEEE                          mindful of the dep end ent effec ts of Transaction on Reliability R-33, August 1984.                            u n e x p e c t e d pla n t c o n d it io n s a nd u n f a v o r a ble h u m a n p e r f o r m a n c e Med heka r, S. R., D. C. Bley, and W . C. Gek ler,                      conditions, i.e., the context for the human "Prediction of Ve ss el and Piping Fa ilure Ra tes in                    action .
Chem ical Process Plants Using the Thomas Mo del," Process Safety Progress, Vol. 12,                    3.2.5.1 Assumptions and Limitations pp. 123-126, April 1993.
The post-initiating event HFEs (i.e., those occurring Mosleh, A., et al., Procedure for Treating                  wh ile attem pting to m itigate the progression of the Com mon-Cause Failure in Safety and R eliability              accident sequence) pose a m uch more Studies: Analytical Bac kgroun d an d T ech niques,          complicated and risk-significant problem than NURE G/CR-4780, Vol. 2, U.S. Nuclear Reg ulatory              pre-initiating event HFEs.              Because human Com mission, January 1989.                                    operators can interact with the plant an d its processes in m any ways, it would be impos sible to Stromberg, H. M., et al., Com m on-Ca use Fa ilure          precisely mod el all these potential interactions.
Da ta Collection and Ana lysis Syste m , Vols. 1            Therefore, a structure is required to organize the through 6, INE L-94 /006 4, Idaho National                    analysis along the most fruitful and important lines.
Engineering Laboratory, December 1995.                        Traditional approaches to HRA, such as THERP (Swa in and Guttmann, 1983) and SLIM (E m bry Thom as, H. M., "Pipe and Vess el Failure                    et al., 1984), focus on those actions required for Probab ility," Reliability Engineering, 2, pp. 83-124,        successful completion of functions modeled in the 1981.                                                        event trees , i.e., those HF Es that have been known as errors of omission.            However, reviews of operating events at nuclear power plants and other industrial facilities have shown that errors of comm ission are often involved in the more serious accidents (Barriere e t al., 1994; Ba rriere e t al.,
3-70
: 3. Technical Activities 1995; Coope r, Luc kas, and W reath all, 1995; and                  dependencies, and by USNRC, NURE G-1624). Moreover, the most serious accidents occur when conditions conspire
* taking advantage of, and integrating, advances to m ak e hum an error very likely, i.e., whe n bo th              in psychology, engineering, plant operations, unusual plant conditions and unfavorable human                      human factors, an d p ro ba bilis tic r isk conditions [perform ance sh aping factors (PS Fs)]                  assessment (PRA) in its modeling and combine to create an error-forcing context (EFC ).                  quantification.
For such cases, the HRA problem changes from an attemp t to evaluate the likelihood of random              As is common to all second generation methods, human error under nominal conditions (i.e.,                    ATHEANA focu ses on the co ntex t in which the expected accident conditions) to one of evaluating            operators m ust perform their function . Inc luded in the likelihood of the occurrence of EFCs as                    their focus on con text is a system atic ap proa ch to addressed in the second-generation method,                    identify important sou rces of dependency among ATHEANA.                                                      human actions and between human actions and systems failures in the plant. Such interactions can A limitation of all first-generation methods is that          couple human response to an entire sequence of they are n ot stru cture d to addre ss th e qu estion of      seem ingly independent cues, greatly increasing the errors of comm ission or the search for challenging            likelihood of an HFE. All accident sequences context. A se con d lim itation is tha t the m ethods          which contain multiple HFEs should be examined themselves do not provide guidance for the                    for possible dependencies. If practical, HFEs identification and prioritization of HFEs. R ather,            which are completely dependent should be HFEs drop out of the event tree analysis and                  re-defined an d m ode led as a sing le event.
quantificatio n tasks, leading to a lack of consistency in the specific human actions                      Fin ally, it is important to rec ogn ize that aspects of addressed in similar PRAs. 3 Because of the                    the HRA process for U .S. rea ctors m ay not a pply to importance of h um an UA s in real-world accidents,            Russian reac tors. For example, the PSFs of it is nec ess ary to propose a modification of existing        training, sta ffing, responsibilities, cross training, methods to address thes e issues. Th is procedure              and cultural imp acts on thinking ca n be differe nt.
guide assumes that recently developed search                  Therefore, the assu m ptions that are im plicitly techniques for UAs and EFCs in the ATHEANA                    embedded in quantification for many existing methodology (USN RC , NUR EG -1624) can be                    methods, e.g., tables for quantification using the adapted to existing quantification approaches to              THERP m ethodology (Swain and Guttmann, 1983),
enhance the value of the PRA.                                  will not apply to the HRA of Russian reactors.
Therefore, while first-generation methods can be ATHEA NA was developed to increase the degree                  used to structure the problem of where human to which an HR A c an rea listic ally identify,                error can occur and be correcte d, th eir represe nt, and quantify the kinds of human                    quantification inform ation is highly su spe ct. For the behaviors seen in accidents and nea r-m iss events            Russian PRA project, a structured judgment at nuclear power plants and at facilities in other            approach for quantificatio n will be re quired. For the industries that involve broadly sim ilar kinds of              pre-initiating event HFEs, som e modification to the human/system interactions.              In particular,        quantification tables in the handbook (Sw ain and AT HEA NA provides this im proved capability by:              Guttmann, 198 3) invo lving the judgm ent of Russian exp erts will be ne eded (Fores ter, et al., 2002). For
* m ore rea listic ally searching for the kinds of        the post-initiating event HFEs, other alternatives human/system interactions that have played              should be considered. F or exam ple SLIM (Embrey important roles in accident responses,                  et al., 1984) provides a structured approach for including the identification and modeling of            applying expert judgment based on the evaluation errors of comm ission (EOCs) and impo rtant              of PSFs for each HFE. The SLIM quantification could be enhanced by the thinking process of ATHEANA. This proces s en tails eva luating the 3
The exception is SHARP1 (Wakefield, et al., 1992), a        most-likely-to-be-significant UA-EFC pairs, the process for performing HRA (rather than a method for          likelihood of the occurrenc e of the EFC, and the quantification) that provides guidance for the                likelihood of the HFE under the EF C.              This identification and prioritization of HFEs. Unfortunately,      judgment-based evaluation offers a better chance too few HRA analyses integrated their selected                for rea sonableness than a table based on methods with the systematic SHARP1 process.
3-71
: 3. Technical Activities inapplicable experience.                                      important EF Cs in a step wis e process . This product will specify the UA-EFC pairs identified for The final methodology described below represe nts            quantification and document the search process a com prom ise am ong com peting factors including            and associated analyst decisions.
state-of-the-art methodologies, budget and schedule, practical limitations on the interaction            The analysis will document all PRA sequences for between plant experts and analysts, and other                which recovery was considered, explaining the practicalities of the project. Specific caveats are          reasons why recovery was or was not analyzed, given for the approach used for quantificatio n in            and, when analyzed, documenting the analysis, Task 4. The basic steps of HRA perform ed in                  exp licitly con sidering the effects o f the c onte xt.
suppo rt of nuclear power plant PRA are similar for all approaches; in some m ethods they are explicitly          3.2.5.3 Task Activities included, others as sum e that the steps are perform ed as part of the PRA, before the HRA                The primary discussion in this section d eals with begins. In som e m ethods they are rigorous, in              dynam ic action s followin g the initiating e vent. A others they are more intuitive. The guidance                  second class of actions, pre-accident errors that provided below for the KNPS HR A is consistent                are generally associated with tes t and re pair with the basic HRA process described in somewhat              activities, can be important in two cases:
different terms in SHARP1, ATH EANA, and the IAEA HRA guidelines (IAEA Safety Series                      1. W hen post-maintenance tes ting is insufficient 50-P-10). Additional generic guidance on good                      to ensure that tested or repaired equipment practices to be em ployed in H RA is available                    has been com pletely res tored to service. In (NRC, 2005) which promotes improved HRA                            this context, insufficient testing means quality.                                                          insufficient by lack of procedural quality, by lack of as suranc e that the tes t will be 3.2.5.2 Produ cts                                                  performed, or by lack of test procedures.
The results of each pre-initiating event HFE                  2. W hen pre-accident errors can cause or analysis will be documented in a repo rt. Th is                    influence post-accident human response, report will also detail the basis for quantification. If          i.e., through a dependency between the pre-U.S. data, s uch as th e tables for quantificatio n in            and post-accident errors.
the Swain and G uttman n (1983) han dbook , are              These types of errors can be modeled using the used, it may be necessary to modify the                      methods described in the Handbook of Huma n probabilities to account for Russian and plant-              Re liability Analysis with Emphasis on Nuclear spe cific ch arac teristics .                                Power Plant Applications (Swain and Guttmann, 1983), although the recomm ended values for A detailed list of HFEs will be documented in a              human error probabilities cited will need to be letter report. The search process for HFEs will              verified as described below.
consider the event tree model and those top events where hum an errors of omission or comm ission                This work is accomp lished by completing the can defeat the associated safety function and                following five Tasks:
m ake co re da m age likely.
Task 1 Quantification of pre-initiating event HFEs, An HRA report will be produced documen ting                  Task 2 Development of a detailed list of post-Activities 1-4 , providing the list of HF Es , detailing                initiating event HFEs, the context and UAs for each HFE, and                        Task 3 Development of a detailed list of significant d o c u m ent ing t h e a n a ly s is p r o c e s s a nd                context associated with each post-initiating qua ntification results. This product will become                        event HFE, part of the Backup Docum entation, Hum an                    Task 4 Qua ntification of post-initiating event Reliability Analysis.                                                    HFEs, Task 5 Re covery analysis.
A detailed list of normal context and significant EFCs associated with each HFE will be                        Each of these tas ks is discussed below. T his documented in a report. The search process for                approach represents an extension of the HRA EFCs begins with the HFE, then identifies the most            methodology beyond that found in the IAEA 3-72
: 3. Technical Activities procedu re guides (IAEA, 1992). Activity 1 is a
* The faulty condition is not discovered and stand-alone task . The next three, Activities 2-4,                    corrected before an initiating event occurs.
are linked together as the step-by-step evaluation of the post-initiating event HFEs. These activities              Sw ain (THERP) is the generally accepted method are closely related to other PRA tasks.                          for determining pre-initiating event HFEs. The Pre-initiating event hum an errors are identified in            m ethods found in the handbook (Swain and the tas k S yste m Modeling. Post-initiating event              Guttmann, 1983) shall therefore be followed.
human errors modeled in the fault trees and event trees are identified in the tasks System Modeling                Task 2 - Development of a Detailed List of and Event Sequence Modeling. Recovery actions                    Post-Initiating Event HFEs will be identified after co m ple tion of the initial quantification (see Section 3.2.6.1) and quantified              The human actions that are directed by plant in the final quantifica tion (see S ection 3.2.6.2). The        procedures form the traditional basis for de fining wa ys the actions are included in the event trees                errors of omission for ea ch initiating event. These and fault trees will be determined in coordination              HFEs are identified during the Accident Sequence with the activities in System M odeling and Event                Development task and verified with plant operators.
Sequence Modeling. The quantification of these                  The selection of HFEs must be bas ed o n plan t-actions will allow System Modeling and Initial                  spe cific de sign, capabilities, an d priorities.
Quantification of Accident Sequences to proceed.                Task 3 - Dev elopm ent of a D etailed List of Significant Context Associated with Each Task 1 - Qu antification of Pre-Initiating Event                Post-Initiating Event HFE HFEs A number of PSFs could influence operator Pre-initiating event errors m ay leave part (or all) of          reliability, for example:
a system unavailable for emergency operation.
These types of errors occur during routine plant
* Tim e of a ccident (d ay or night) operation, tes ting , and re pair activities and may
* Hum an interactions among personnel persist undetected before the occurrence of an
* Sc enario effect (the level of severity and initiating event. They are included only in the                      difficulty the opera tor as soc iates w ith the system fault trees for the following reasons:                        accident situation)
* T im e available to m ake a d ecision and perform
* The error rates for these actions do not                        an action depend on the sequence of events after an
* Level of operator knowledge initiating event occurs.
* Ex iste nce of tra ining on a given scenario
* Quality of training
* The re is generally no significant human
* Quality and availability of procedures dependence between these errors and
* Co gnitive c om plexity subsequent operator actions after the initiating
* Level of stress event occ urs. (Note that the ATHEANA search
* Hum an-machine interface.
for EFCs considers cases in which this assumption of independence may not be                      Expert opinion, from plant operators, operations valid.)                                                    supervisors, and HRA analysts, can be used to develop an initial list of PSFs and to reduce the These types of errors can contribute to system                  number of PSFs to those of most importance.
una vailability if all of the following cond itions occ ur:      No te that some factors vary by acc ident s cenario and others are global as they are influenced by
* A test, inspectio n, or repair ac tivity is                plant condition. Both types of factors should be perform ed. During this activity, a component              considered for each post-initiating event HFE and is placed in an alignment that mak es it                  structured into de cision tree logic structu res, with unavailable for emergency operation.                      the PS Fs used as top events. Th e decision tree is used in quantification and is shown as part of
* Te sting, re pair, or ope rations pe rsonne l fail to      Task 4 below. Table 3-17 p rovides examples of restore the component to its required status.              PSFs used in the analysis and their definitions.
3-73
: 3. Technical Activities Task 4 - Quantification of Post-Initiating Event              answering the questions raised by the decision tree HFEs                                                          logic, such as "wh at is the effect of the scenario on the operator?", "How effective is the MMI in helping As mentioned in the assumptions and limitations of            the ope rator?", and so on, a pathwa y for a Section 3.2.5.1, the approach for quantification              particular HFE through the tree can be drawn, and represents a comprom ise among theoretical                    a corresponding point on the decis ion tree scale preferences and bud get/sche dule requ irem ents as          (i.e., in the set of end-s tates) can be defined.
we ll as practicalities of the project including available expertise and limitations on the                    Calibration of the K-values to the probability of interaction between plant experts and analysts.              each HFE is acc om plished by separately The final approach used is a variatio n on the                evaluating selected HFEs by other means and decision tree method (Spurgin , et al., 1980, and          scaling the rem aining events by the re lationship Bareith, et al., 1997). The approach is vu lnerable          between K-values and probabilities for the anchor to well-known theoretical objections, such as the            events. Som e adaptation of the K-valu es is PSF are not independe nt; their relationsh ips to            poss ible to account for dependencies am ong the each other and to any probability anchors are                PSFs.
dependent on plant conditions and specifics of each different scenario; lack of strong controls for          Ta sk 5 - Reco very Ana lysis bias and re liability; and no formal treatment of uncertainty is provided.                                      The same process is used for the analysis of recovery actions as for the other post-initiating Pre-quantification qualitative ana lysis attem pted to        event HFEs as described in Tasks 3-5 above.
examine som e of th e issues of co ntex t described in second generation HRA m ethods and                        3.2.5.4 Task Interfaces adaptations to the decision tree process attempted to account for dependencies. The benefits of the              This tas k h as exten sive interactions with the approach are that the issues im portant to HRA are            following other PRA tasks.
well-examined qualitatively and can be used as the bas is for im prov em ents in the fu ture.                    Plant Fam iliarization.        The HRA relies on information from the P lant Fam iliarization task to The approach uses the following basic scheme and              provide a basic understanding of plant design, is more fully described in the references. Specifics          operations, procedures, and crew manning levels.
of the final adaptations will be described in the KNPS final PRA report. Using the list of PSFs                Initiating Event Analysis . Development of initiating developed in the previous task, plant operations              events should take into account the HRA experts assign a weighting facto r (refe rred to as a        contributions.
K-factor) based on the perceived importance of each decision tree top event (s elected P SF ). A            Accident Seq uen ce D eve lopm ent. The HRA relies simplified exam ple decision tree is given in Figure          on the Accident Sequence Developm ent task to 3.6. Each branch under the top event is assigned              identify a number of post-initiating e vent HF Es, to a K-va lue be twe en 1.0 (for the m ost beneficial          describe how the plant can fail in an integrated branch) and that PSFs K-factor (for the most                sense, and to define the context under which the detrimental bran ch).      Eac h pa th through the            ope rators m ust act.
decision tree has an accum ulated coefficients on an arbitrary scale, which are obtained by the                System Modeling. The HRA relies on the System m ultiplication of the applicable K-values for each          Mod eling task to identify pre-initiating event HFEs branch path ass ociated with tha t end-state . Note          and a basic unde rstan ding of ho w systems a re that the higher the coeffic ient, the m ore unlik ely it      operated and are interrelated.
is that the operators will successfully accomplish the required action.                                          Quantification and Re sults .            T he Initia l Quantification is used to identify specific cases The decision tree is used to evaluate specific HFE            (sequences and cutsets) where hum an recove ry by having plant operations experts examine the                actions are likely to be carried out and impact the required action against the logic of the tree. By 3-74
: 3. Technical Activities results. The HRA provides quantified HFEs to use                  Procee dings of PSA M III, Crete, Greece (19 97).
in the quantification of specific cutsets in the Quantification tasks.                                              Barriere, M., et al.,"An Analysis of Operational Experience During Low Power and Shutdown and 3.2.5.5 References                                                A Plan for Addres sing Hum an R eliability Assessm ent Issu es," NURE G/CR-6093, Barriere, M. T., et al., Multidisciplinary Frame work            Brookhaven National Laboratory, June 1994.
for Hu m an Re liability An alysis with an Application to Errors of Comm ission and Dependencies,                        Chien, S. H., et al., "Quantification of Human Error N U R E G /C R - 6 2 6 5 , B r o o k h a v e n N a t io n a l      R a t e s U si ng a S LIM-B ased A ppro a c h ,"
Laboratory, August 1995.                                          Proceedings of the 1988 IEEE Fourth Conference on Hum an Fa cto rs and Pow er Plants , Monterey, Bareith, A., et al., "Treatment of Hum an Factors for              California, June 1988.
Im prov em ents at the Paks N uclear Power Plant,"
3-75
: 3. Technical Activities Table 3-1 7 Exa mple of perfo rma nce shaping factors Performance          Potential                              Branch Definition Shaping Factor        Branches Available tim e (tim e  Long            Time is sufficient to complete the action even if the decision on interval from the first                taking the action is not m ade whe n it first becom es p oss ible to mom ent that the                        com plete the initiating event.
initiating event co uld begin until the        Middle          Time is more or less sufficient to complete the action even if the m om ent wh en it                      decision on taking the action is not made when it first becomes would be no longer                      pos sible to com plete the initiating event.
possible, accounting for the time to        Short          Tim e is insufficient or barely suffic ient to c om plete th e actio n if complete the                            the decision on taking the action is not made quickly when it first initiating event)                      becom es poss ible to com plete th e initiatin g event or tim e requ ired to ta ke action is com para ble to the tim e available to com plete the initiating event.
Scenario effect        Easy            W hen the initiating event is completed, the parameters are not (influence of the                      changing quickly, the process is stable, the stress level is not emergency situation                    high, and the operator understands the situation and does not on the operator at                      expect severe consequences.
the mom ent the initiating event is    Medium          W hen the initiating event is com pleted, the param eters are complete)                              changing more or less quickly, the stress level is medium, the process is not stable, and the operator understands the situation in general and may expect severe consequences.
Severe          W hen the initiating event is com pleted, the param eters are changing quickly, there are exten sive alarm and light s ignals occurring, the stress level is high, the process is not stable, and the opera tor m ay not u nde rstan d the situation and exp ects severe consequences.
Co gnitive c om plexity Sim ple        The need to complete the action is obvious, and the operator for decision making                    has goo d training on the initiating event.
(cognitive c om plexity for making the decision on the need    Diffic ult      The need to complete the action is not clearly obvious, and the to complete an                          ope rator has som e training on the initiating event.
action , taking into account the impact of operator training    Ve ry difficult The need to complete the action is not obvious, and the on the initiating                      ope rator has no training on the initiating eve nt.
event) 3-76
: 3. Technical Activities Table 3-17  Example of performance shaping factors (contd)
Performance            Potential                              Branch Definition Shaping Factor          Branches Hum an-machine            Good          The hum an-machine interface for taking action in the face of the interface (quality and                  initiating event is well designed, the quality and fitness of the fitness of the                          interface allows completion of the action without difficulties, one human-m achine                          operator can complete the action, and the information required interface associated                    to make the decision to take the action is good.
with taking action on an initiating event,      Adequ ate    The quality and fitness of the interface for taking action in the taking into account                    face of the initiating event is more or less adequate, and the the quality of the                      inform atio n re quired to m ak e the decision to tak e actio n is only information required                    adequate.
to decide on the Poor          The interface fea tures are not we ll designed fo r takin g actio n in nee d to com plete the fa ce o f the initiating event, the o pera tor ex pec ts the initiating event) considerable difficulties in taking action, more than one operator is needed to take action, and the information required to make the decision to take action is inadequate for understanding (or the informa tion is absen t entirely).
Quality of                Good          The initiating event is well described in the procedure, and the procedures (impact                      procedu re is well known to the operator.
of the availability and quality of relevant procedures related        Poor          The initiating event is poorly described or not described in the to the initiating                      procedu re, and the proced ure is not well known to the operator.
event) 3-77
: 3. Technical Activities Figu re 3.6 Ex am ple of a dec ision tre e for p erform anc e shapin g factors 3-78
: 3. Technical Activities Chu, T.-L., et al., Evaluation of Potential Severe                USNRC, Good Practices for Implementing Hum an Accidents During Low Power and Shutdown                            Re liability Analysis (HRA), NUREG-1792, U.S.
Operations at Su rry, Unit 1: Analysis of Core                      Nuclear Regulatory Com mission, April 2005.
Dam age Freque ncy fro m Internal Events During Mid-Loop Operation s, Vol. 2, Part 1B, Chapter 8,                  W reath all, J., and A. Ram ey-Sm ith, AT HE AN A: A N U R E G / C R - 6 1 4 4 , B r o o k h a v e n N a t io n a l      Technique for Human Error Analysis--An Overview Laboratory, June 1994.                                              of Its Methodological Bas is , O E C D /N EA Specialists Meeting on Hum an Perform ance in Coop er, S. E., W . J. Lucka s, a nd J. W reath all,                Operational Events, Chattanooga, Tennessee, Human-System Event Classification Scheme                          October 13-17, 1997.
(HSECS) Database Description, Brookhaven National Laboratory Technical Report L-2415/95-1,                  W akefield, D.J., G.W . Parry, A.J. Spurgin, and P.
Decem ber 21, 1995.                                                Moieni. System atic H um an A ction R eliability Procedure (Sharp) Enhancement Project, SHARP1 Em brey, D. E., et al., SLIM-Ma ud: A n Ap proa ch to              Methodology Report, EPRI TR-101711. Palo Alto, Assessing Hum an Error Probabilities Using                          CA: Electric Power Research Institute, 1992.
Structured Expert Judgment, NUREG/CR-3518, Vols. 1 and 2, Brookhaven National Laboratory,                      3.2.6 Quantification and Results 1984.
The quantification and resu lts com pon ent cons ists Forester, J., Bley, D ., Coope r, S., Kolazkowski, A.,              of three tasks: (1) initial quantification of accident Lois, E., Siu, N., Th orns bury, E., and W reath all, J.,          sequences, (2) final quantification of accident Improved AT HEA NA Q uantification Process and                    sequences, and (3) sensitivity and importance Da ta Needs, to be published in proceedings of                    analyses. The objective of the task on initial OECD/NEA W orking Group W G-Risk Assessment:                        quantification is to perform an initial, preliminary Bu ilding the New HRA: Strengthening the Link                      quantification of the set of acc ident sequen ces , i.e.,
between Experience and H RA, Munich, Germ any,                    once the event tree-based , system-level January 2002.                                                      expressions become available. Through this task, m odels that represent the response of plant IAEA, Hum an Re liability An alysis in Probabilistic              systems and operation actions are linked to plant Safety Assessment for Nuclear Power Plants"                        initiators to form, in terms of basic events, the logic Safety Series 50-P-10, International Atomic Energy                  expressions for accident sequenc es. The o bjective Agency, 1995.                                                      of the final quantification is to identify those accident sequences considered to be dominant IAEA, Procedures for Co nducting Probabilistic                    after initial quantification and to determ ine where Safety Asses sm ents of Nuc lear Power Plan ts                      refine m ents to the risk profile may be warranted (Level 1), Safety Series No. 50-P-4, International                and then to carry out th e new quantification. The Atomic Energy Agency, 1992.                                        objective of the sen sitivity ana lysis is to inves tigate the implications of modeling choices other than the Spurgin, A. J., et al., "Ope rator Reliability                      choices that were actually used. Importance Experim ents Using Power Plant Simulators," EPRI                    analysis is to assess the importance of model NP-6037, Electric Power Research Institute, P alo                  parameters, evaluated within the terms of the Alto, California (1990).                                            m odel itself.
Swain, A. D., and H. E. Guttmann, Handbook of                      3.2.6.1 Assumption and Limitations Hum an Reliability Analysis with Emphasis on Nuclear Power Plant Applications, NUREG/CR-                        Com promises and assumptions that were made in 1278, Sandia National Laboratories, 1983.                          previous tasks, such as the event sequence modeling task, the system m ode ling task, an d da ta USNRC, "Technical Basis and Implementation                          analysis task, ind irectly lim it the outpu t fro m this Guidelines for A Technique for Hum an Event                        task. Further limits on the applicability of the An alysis (ATHEANA )," NURE G-1624, Rev. 1, U.S.                    outp uts from this tas k d irectly com e from the lim its Nuclear Regulatory Com mission, May 2000.                          imposed by the level of truncation employed and the lack of recovery modeling employed in the 3-79
: 3. Technical Activities m odel. Since the output from this tas k is based on
* System-level      and    com pon ent- level preliminary data and partial m odeling (recovery is                      importance measures based on focused addressed in a su bse que nt task), the information                      PR A m ode l, derived should only be applied to prioritize future work. The follow ing ac tivities are performed as
* Discussion of "PRA Insights" based on part of this task.                                                      system and com pon ent importance measures.
3.2.6.2 Produ cts 3.2.6.3 Task Activities The products of the task on initial quantification of accident sequences are:                                      The quantification and resu lts com pon ent cons ists of three tasks: (1) initial quantification of accident
: 1.      Based on unrefined data, screening                  sequences, (2) fina l quan tification of accident human error pro babilitie s, and taking no          sequences, and (3) sensitivity and importance credit for recovery, this task produces              ana lyses.
reduced logic expressions and associated frequencies for each accident sequence              Task 1 - Initial Q uantification of Accident and each plant damage state.                        Sequences
: 2.      In add ition, although this task does not            The objective of this tas k is to perform an initial, produce final res ults, it must be                  preliminary quantification of the set of accident documented to th e degree necessary to              sequences, i.e., once the event tree-based, suppo rt an audit of the subsequent                  system-level expressions become available.
modeling choices that were based on the              Through this task, models that represent the results of this tas k. In particular, it should      response of plant systems and operator actions are be docum ented sufficiently to support              linked to plant initia tors to form in term s of ba sic replicatio n o f the results.              This      events the logic express ions for accident documentation will take the form of an              sequences. Initial quantification is described below appendix, as described under the task                in general term s. M ore deta iled guidance is Docum entation. The types of PR A au dits            provided in some of the references listed at the end are discussed in the task Qu ality                  of this ch apte r. In particular, reference should be Assurance.                                          m ade to Drou in (1987) and N RC (1997).
The products for the task on final quantification of          1.        Boolean Expressions accident sequences are:
Initiate an algorithm that transforms each the expressions, probability of frequency plots, and          system-level accident sequence representation associated mea n frequencies for:            (a) each        de rived from the task Event Sequence Modeling accident sequence, before and after recovery is              into a component-level, Boolean expression credited and (b) ea ch p lant da m age state, before          con taining the m inim al cuts ets.
and after recovery is credited.
: 2.        System Success The products of the task on sens itivity and importa nce ana lyses a re:                                  Account for system success as necessary by using the appro xim ation techn iques m ention ed b elow.
* Importance rankings for systems and com pon ents at the conclusion of the stu dy,        3.        Truncation Levels
* Q uantification of m odel sensitivity to            Re-run the calculation with different truncation alternative choices in controversial                levels until the c alculation runs to com pletion with modeling areas (e.g., core damage                    as little truncation as possible. Of course, the level frequency calculated assuming changes in            of the truncation should be comm ensurate with the baseline assum ptions),                              intended application of the PRA study and the level of available da ta. Identification of p ote ntia l subtle 3-80
: 3. Technical Activities interactions between systems and support systems            system B failure. The feasibility of this will depend requires, for example, retention of higher order            on many things, including the software being used.
cutsets.                                                    It has been customary to address this point by formulating a logic expression containing the
: 4.        Plant Dam age States                              conjunctions of failures that are considered inconsistent with the sequence logic (success of Form ulate and quan tify a logic expression for each        system A and failure of s yste m B). This logic plant damage state (corresponding to the logical            expression is then used as a template to OR of se que nce s binn ed into that state).                sys tem atic ally delete from the pure failure portion of the accident sequ ence ex pression those terms Since the process described above is the                    indicated by the template to imply the failure of the integration of a large amount of information for the        system that is supposed to succeed. At best, this first time, a significant level of review,                  is an approxim atio n and, in ap plying it, one must troubleshooting, and iteration with previous tasks is      take care not to e liminate "late" system failures that necess ary. An accident sequence expression can            may be consistent with "early" system success.
be very complex, and subtle logic errors manifest          This point is further discussed below.
themselves at this stage. Incorrect formulations, in the con text of a system m ode l, may lead to              So-called "phased m ission analysis" is very closely erroneous logic at the sequence level. Disallowed          related to this point. A particular system m ay be system configurations that have been eliminated            challenged m ore than once during an accident from system m odels may emerge again at the                sequence, perhaps with different mission success sequence level, depending on how disallowed                criteria. The system m ode ling m ust acco m m oda te configurations have been dealt with.                        the necessary distinctions, but this point is not com pletely addressed until accident sequence Much of the point of the detailed model                    quantification. Certain illogical outcomes m ust be development is to properly reflect the conditional          avoided. A contribution that im plies early failure relationships between failures of different systems        and late success may be an error. Contributing or between the initiating event and subsequent              factors are that the faile d equipm ent is either system failures. For example, if a support system          restored (an d the re sto ration is modeled) or that failure affects more than one system in a                  mission success is indeed compatible with bo th sequence, this is likely to be important, and it is        early failure a nd late success. The situatio n is essential for this to be properly reflected in the          m ore complex with respect to early success and accident sequence expression. Similarly, if a pipe          late failure. T here m ay be c ontributions to late break initiating event can adversely affect                failure from system failures occurring after the early mitigating systems, this must be captu red. In order        success that are not necessarily incompatible.
for these properties to hold, the linkage mu st be          How ever, care m ust be taken .            Exhaustive modeled pro perly, and the sequence quantification          treatm ent of these issues is not comm on in U.S.
task m ust be exec uted prope rly. Although the            full power PRAs, partly because it is burdensome project controls in the system m odeling task should        and not necessarily important (see, for example, have ensured that the separate system m odels are          Drouin, 1987). It appears in many full power PRAs properly interfaced, review at this stage to see that      that failures occurring during standby are much it has been done properly is a good idea.                  m ore im porta nt than failures occurring after an initiating event (because the exposure tim e is much System success in a sequence may also be                    longer). However, it is the analysts burden to significant. The conjunction of system A                address these issues and decide whethe r it is succeeding and system B failing may be much less            neces sary to allocate modeling resources to them.
like ly than the unconditional failure of system B          In general, a conserva tive approxim atio n will viewed in isolation . It has been found that neglect        present itself, and this can be adopted if it does not of this po int can seriously disto rt accident              distort the risk pro file in an unaccepta bly sequence quantification. Therefore, it is custom ary        misleading way. A paper by Xue and W ang (1989) to add ress this p oint, even though neglecting it may      discusses the iss ues and pres ents algorithm s to be "conservative" and addressing it is troublesome.        include during sequence quantification.
Fo rm ally, one should construct an expression which logically ANDs system A su cce ss w ith              Obtaining explicit, reduced, c om plete, b asic event 3-81
: 3. Technical Activities level expressions for all accident sequences would              analysis and to determ ine where refine m ents to the be impracticable for most plant models developed                risk profile may be warranted. Two such areas in recent years. The Boolean expressions become                  where refineme nts are necess ary are human error too large to be manipulated efficiently. (The large              model i ng and param etri c comm on-cause event tree approach may offer certain advantages                modeling. Other areas may have been treated in this regard.) However, the top event frequency                sim ilarly by the ana lysts. At this stage, sensitivity of may be dom inated pro babilistica lly by a sm all                results to each issue is assessed to determine fraction of the terms in the full expression. Many              whether more work is necessary to improve the terms can then be neglected without significant                  model in this regard.
change to the results or conclusions. The process of "truncating" these contributions mak es accident              Until preliminary sequence m odels were available, sequence quantificatio n fe asible. Typically, th is is          recovery m odeling was som ewhat premature. At implemented in a computer code by setting a                      this point, leading contributors to sequence truncation cutoff level and instructing the algorithm            frequencies are further analyzed to see whether to dispo se o f cuts ets whose probability is less than          recovery m o d e l i n g ch an ge s th e re su lts the cutoff. T he effect of such an algorithm is not              significantly. If so, the sequenc e expres sions are always easy to predict; for example, it can depend              augmented to m ore fully addre ss o pera tor/plant on the level of detail to which failu re events have            recovery actions.
been m odeled.        If a failure event has been decom posed into a large num ber of individually                "Q uantification" implies treatm ent of unc ertainty.
unlike ly basic events, then cutsets containing these            For purposes of this task, uncertainty of each unlike ly events a re m ore lik ely to be truncated than        model parameter is developed as appropriate in if a single lumped event is used to capture all of the          the tasks on human reliability analysis, component contributions.                                                  reliability, or comm on-cause failure probabilities.
The propagation of parameter distributions through If truncation is done without an appreciation of how            the integrated model is accomplished by software much top event probability is being sacrificed, then            whose detailed description is beyond the scope of it is an uncontrolled approximation. This is an                  this guide. Ericson et al. (1990) does provide some important point. It is cu stom ary to base many                  information regarding software used for unc ertainty sen sitivity studies and importance analyses on the              propagation.
Boolean expressions obtained through the truncation process. Clearly, the results of such                Most of the parameters that appear explicitly in a sen sitivity studies can be seriously distorted by              PRA m odel are not objective physical parameters.
truncation. Tru nca tion is, the refore, to be carried          Rather, they are frequencies or split fractions that out only to the degree necessary to allow the                    d e p e n d o n m a n u f a c t u r in g p r o c e s s e s ,
analysis to go forward in a pra ctical way, and its              programm atic activities, managem ent decisions, effec ts on later uses of the results m ust b e                  maintenance practices, operator training, and so ass ess ed.                                                      on. W hen a PRA m odel has bee n refined to where the results are considered state of knowledge and Evide ntly, if a sequence's probability (conditional on          when the PRA model provides a repres entative the initiating event) is assessed to be only a few              picture of the as-built, as-operated plant, then a key orders of magnitude greater than the truncation                  output of the overall proje ct is the body of level use d to simp lify pro cess ing, the n the re sult is      embedded assum ptions upon which the model clearly susp ect.                                                structure and model parameters rest.                  The technical adequacy of the P RA is closely aligned to Task 2 - Final Q uantification of Accident                      how well these assumptions are fulfilled.
Sequences This point is discussed further in the section on At this stage of the analysis, certain portions of the          Sensitivity and Im porta nce Ana lyses.
model may have been constructed in a simple way with a slightly conservative bias in order to obtain a          1.        Sensitivity and Uncertainty quick look at the risk profile. The objective of this task is to identify those accident sequences                    Sensitivity and unc ertainty analyses are carried out considered to be dom inant at this stage of the                  to ascertain contributors that are dominant to the 3-82
: 3. Technical Activities risk profile and contributors that are not dominant          quantification and on sensitivity and importance but to which results are se nsitive. T his ac tivity          results, the com m on-cause quantificatio n is should be done generically, either with em phasis            reviewed (see Section 3.2.4), and the resulting on hum an errors or with emphasis on comm on-                parameterization is used in this task.
cause param eters and, also generally, with a view toward deciding which areas may need attention.              Recovery Modeling The analysts should begin by simply looking at the minimal cutse ts to see what is dom inant.                    In many plants, particularly older ones, it has been Com puter-assisted analysis can help in this regard.          found that unacceptable results (unacceptably high So m e item s w hose "po int" like lihood seem s sm all      accident frequencies) are obtained if it is assumed may actua lly dom inate the results whe n un certainty        that no operator action is taken to initiate or is properly reflected, and this is the kind of item          reinitiate system operation in the event of that needs more attention.                                    problems, such as misaligned valves or breakers, spurious system trips, or even outright component
: 2.        Enhanced Modeling                                  failure. It is, therefore, necessary to model actions taken after the initiating event, not only the U nc er tain p r o b a b il it ie s m a y h a ve b e e n      proceduralized actions represented at the event conservatively quantified in the initial quantification      tree heading level but also action s th at c ould in orde r to prevent possible loss of significant            poten tially be taken to recover failed equipm ent.
scenarios in a screening process. Therefore, at              Correspondingly, appreciation of the role of these the present stage, items that appear insignificant            actions in the safety basis has been significantly are likely to be insignificant, unless th ere is              enhanced, possibly through the development or significant uncertainty associated with them .                revision of emergency operating procedures and Decisions are made a t this stage as to whether              other procedural guidance and operator training.
sen sitivity items have been m odeled well enough and, if not, how the modeling should be enhanced.            Such recovery actions must, in general, be modeled at or near the cutset level rather than at
: 3.        Recovery Actions                                    the system level. Recove rability of a system depends on which component has failed and on Significant recovery actions are identified, and              the environment near the failed component that engineering descriptions of these actions are                could jeopardize reco very ac tions b y operators.
furnished to the analysts responsible for the ir              The re are other factors as well. Is the component quantification. These are actions for which credit            accessible? Is the environment too harsh, or even can be justified and for w hich results are                  contaminated? How m uch time will be n eed ed to significantly altered. These actions may include              effect any necess ary repair? The answers to these those actions performed in direct response to an              questions depend, in general, on the details of accident and/or actions performed in recovering a            each particular cutse t.        At the very least, failed or unavailable system or co m pon ent. Credit          recoverab ility depends on the basic event being for both types of actions should not be taken                analyzed. Mo re ge nera lly, however, rec overability unless procedu ral guidance and training in the              (even "diagnosability") of each event depends on required actions are part of the operations at the            the state of the rest of the system.
plant.
As such, everything that is true for the accident
: 4.        Requantification                                    sequence is true for every m inim al cuts et in the sequence. In addition, each minimal cutset has The entire m odel is requantified using the best              m ore specific characteristics that must be available m ode ls and data.            Propagation of      acc oun ted fo r.
unc ertainty through all models is included in this activity. Software for propag ating u nce rtainty          Modeling of an y particu lar instance of "failure to distributions are available and are mentioned in the          recover from a basic event" is, of co urse, a Ericson et al. reference, for example.                        particular application of human performance Comm on-Cause Modeling                                        modeling. Tech niques to acco m plish this are discussed in the task Human Reliability Analysis.
Based on the pre lim inary accident sequence                  These techniques do not come into play until the 3-83
: 3. Technical Activities scope and feas ibility of each reco very action have          high Risk Achievement W orth) are also candidates been established from an engineering point of                for exa m ination because they are frequently view.                                                        challenged.      If they have a high Birnbaum importance and a low Fussell-Vesely importance, Occurrence of a particular basic event may                    this is because they have bee n m odeled as very essentia lly place a system into an irreversible state        reliable. The results of the model depend critica lly from which recovery of the basic event does not              on the correctness of this m odeling, and it is recover the system, even though no minimal cutset            important to make sure that the item s are truly is strictly true with the event recovered. A trivial          reliable.
exam ple would be an event, such as loss of seal cooling, that leads to a transient-induce d loss-of-          Items that ha ve both high F ussell-Vesely and high coolant acc ident. Recovery of cooling will not              Birnbaum importanc es shou ld be exam ined very necess arily reseal the loss-of-c oolant accident. In        carefully. Such items are challenged frequently, addition to th ese types of c ases in which one              but they are not considered reliable. These items component suffers damage as a result of another's            are high priority items.
behavior, it is pos sible fo r othe r kind s of s tate changes to occur that are not necessarily                    All of the above comm ents are affected by unrecoverable but whose recovery must be                      uncertainty.
ana lyzed in the con text of the e ntire cutse t.
The single-event importance m easures on which Since each accident sequence m ay comprise                    the above rules of thumb a re based have very thousands of minimal cutsets, it may be asked how            lim ited meaning. Events that are "important" can feasible is it to approach recovery m ode ling with          be considered to need exam ination , but generally, any rigo r at the cutse t level. F ortun ate ly, some of      unless a model contains significant single-failure the above considerations can be form ula ted                  cutsets, com binations of events are more important logically within some software packages, permitting          than individual events, and the single-event som e automation of the process of recovery                  importance measures are a poor way to an alyze modeling. This kind of m ode ling has be en very              com binations. In a related vein, the effects of important in the analysis of older U.S. plants.              embedded assum ptio ns are poten tially very importa nt. A m arginal suc ces s pa th credited in the Guidelines for Prioritization                                PRA can artificially and inappropriately reduce m any single-event importances. These matters In order to produce the best possible final res ult, it      are discussed furthe r un der Sensitivity and is im portant to identify those areas of the model            Importance Analyses.
that need the m ost w ork .
Task 3 - Sensitivity and Importance Analyses S om e rules of thumb for evaluating individual systems or components are liste d here. It is                The re are tw o major objectives of this task. One reemphasized that the analysts are res ponsible for          objective ("Sensitivity Analysis") is to investigate formulating and applying their own reasoning                  the implications of modeling choices other than the processes.                                                    choices that were actua lly made in the formulation of the m odel. This is necessa ry in order to Items (systems or basic events) that have a high              reinforce the credibility of the m odel and, by Fu ss ell-V esely importance (or high Risk Reduction          implication , the credibility of the safe ty basis. The W orth) are candidates for reexamination because              other objective ("Importance Analysis") is to assess the overall results are clearly sensitive to these            the importanc e of m odel param eters, evaluated items. If they were im proved (e.g., increase in              with in the terms of the model itself. This is done system availability), the calculated risk would              during modeling tasks in order to help focus diminish. If the quantification upon reexamination            resources on the most critical modeling areas and is found to be reasonable, then cost-beneficial              is don e at the con clusion of the analysis in orde r to wa ys to reduce these contributions should be                help in implem entatio n of the safety basis considered.                                                  (e.g., optimal allocation of testing and maintenance resources, based in part on measures of the Items that have a high Birnbaum importance (or                importance of particular failure probabilities or 3-84
: 3. Technical Activities particular maintenanc e unavailabilities).                    After the base case PRA m odel is finalized, the PRA can be used in different applications.
Sensitivity Analysis                                          Sensitivity calculations are o ften p erform ed to evaluate the changes in plant risk as a result of In developing a Level 1 PRA m odel, many issues              changes in plant design, operation, and operator may arise due to lack of knowledge about them.                training. The ch ang es a t the plant m ay be to For example, the success criteria for system s in            correct the vulnerabilities identified in the PRA different boundary conditions may be unknown,                study or to implement changes in regulatory and the level of detail of a system m odel may need          requirem ents.        For example, as part of the to be determined. One way to resolve the issue on            Individual Plant Examination program of U.S.
success criteria is to perform detailed dete rm inistic      plants, the utilities are required to perform analysis including tes ting an d ex perim ents . In this      sen sitivity calculations to evaluate any plant case, sensitivity calculations can possibly                  improv em ents m ade as a result of the Individual determine the most important cases that should be            Plant Examination. Other PRA applications include dete rm inistically evaluated . In the case of system        changes in allowed outage times in the Technical m odeling, sensitivity calculations based on a                Specifications, increases in test or inspection simplified logic model can potentially determine              inte rva ls of the inservice testing program and that a more detailed model is not necessary. PRA              inservice inspection program, and planning of areas that are prime candidates fo r sen sitivity            online m ainten anc e ac tivities.
analysis include: failure data, hum an re liability analysis, com m on-caus e failure analysis, success          Importance Analysis criteria, and pump seal models.
This section refers to importance analyses Lik ely examples of highly significant issues are the        p e r f o rm e d o n s e q ue n c e -l ev e l B o o l e a n feasibility of a particular recovery action taking            exp ressions.
place during an accident or a question of event tree structure (whether a given core damage sequence              W hen the plant model has been brought to a stage can be transform ed into a success ful outcome by            at which accident sequences are express ed in operation of a particular system ) or perhaps a              terms of trains and com ponents (w ith component question of binning (whether the phenomenology of            failures in support systems ex plicitly factored in),
a particular sequence w arrants placing it into one          then a great deal of information is present in these bin or ano ther).                                            sequence-level expressions. Some conclusions may suggest themselves from inspection of the If the sensitivity issue is such that extensive              expressions, but generally, their complexity make m ode ling wo uld ha ve to be un derta ken in ord er to      it im practica l to try to derive insights in this way. At treat each possible outcome thoroughly and if such            this stage, it is potentially useful to perform treatment is infea sible w ithin the s cop e of the          importance calculations which rank model proje ct, then it m ay be n ece ssa ry to live with          param eters (such as basic event probabilities) significant unc ertainty in the res ults. Such an            according to how much the model parameter outcom e is a rational input to consideration of              influences the results or how much change in the follow-on w ork .                                            results wou ld take plac e if the p aram eters were to chang e. These results are useful in deciding how Pa rticularly importa nt insta nce s of s ens itivity        m uch wo rk to invest in carefully quantifying model calculations are those that establish the robustness          param eters. In more advanced applications, one of the mission success criteria assumed in the                can ass ess the importance of conjunctions of system m ode ls.      These success criteria can            events; the importance of a conjunction can help to significantly affect the logic structure of the m odel.      decide whether to invest in searching for Sim ilarly, ass um ptions m ight have been made              dependencies between the eleme nts of the regarding whe ther c ertain trans ients c aus e sa fety      conjunction.        W hen the PRA is substan tially relief valves to lift, and this can affect event tree        com plete and the safety basis has been structure. It must be the responsibility of the              formulated, the impo rtanc e an alysis ca n he lp to analysts to identify priorities in these areas.              establish how to allocate performance over the elem ents of the safety basis and, in particular, how to allocate testing and maintenance effort over the 3-85
: 3. Technical Activities elem ents of the safe ty basis.                                importa nt, then it probably is; if conventional importance analysis suggests that a particular SSC Fin ally, once the model has been broug ht into                is not im portant, this conclusion cannot be essentia lly fina l form , the im portance analysis is the      accepted without careful exploration of the reason prim ary tool for deriving "insights" from the PRA.            for that result. Conclusions from importance tables Importance information transcends the com plexity              are, therefore, to b e drawn very carefully. During of a p lant logic model to provide a kind of                    model developm ent, howe ver, im portance analysis sensitivity-type info rm atio n that is understan dable        is a very useful way to develop understanding of and can be very valuable. For example, in many                  the m ode l.
previous studies, the top event frequency has been found to be dominated by a few contributors. That              The activities to be done for the impo rtance is, it has bee n found that s cenarios th at have in            analysis are:
comm on rela tively few "important" events sum to a large fraction of calculated top event frequ enc y. A          1.        In support of the Hum an Reliability finding of this kind is important to discuss in the                      An alysis (see Sectio n 3.2.5), gen erate conclusions of the PR A. The reasons for such a                          importance rankings for hum an errors circumstance should be identified and discussed.                          (Fussell-Vesely and Birnbaum and/or Risk Reduction and Risk Achievem ent W orths).
At various stages of model development (cf.                    2.        In support of the parametric com m on-
"relationship to othe r task s" ab ove), it is useful to                  cause analysis (see Section 3.2.4),
develop importance rank ing tables as part of a                          gen erate im portance rank ings for model review and debu gging effort. It is first                          comm on-cause events (Fu ss ell-V esely important to re view th e leading term s in the logic                    and Birnbaum and/or Risk Reduction and expressions for the various accident se quences in                        Risk A chievem ent W orths ).
order to ensure that the y m ak e sense, but, in general, these expressions are too large to be                  3.        Ge nera te Fussell-Vesely importances for reviewed entirely by inspection.            Importance                  frontline syste m s.
rankings by their nature provide information about the entire expression (information that m ust be                4.        W hen mod eling is complete, generate final interpreted with great care). Events at the top of                        versions of the above to support the the lists should be questio ned: w hy are these                          discussions of the P RA insights in the final events rank ed h ighly? If the answer is not obvious,                    repo rt.
then the m odeling should be checke d, both in the logic asp ects and in the quantification aspects. An            An Alte rnativ e M odel to Sensitivity Analysis analogous que stion s hou ld be a sk ed a bou t even ts at the bottom of the lists: why are these events                Two approaches to resolving a modeling issue ranked low? Again, if the answer is not obvious,                without performing extensive determ inistic then the model should be checked. Generally,                    evaluation can be identified:
surprises on the importance lists are either indica tions of modeling error or signal the                    1.        Based on the best judgm ent of the analyst, em ergence of a modeling insight. Events at the                          one modeling assumption is adopted as a top of one or m ore imp ortan ce lists need to be                        base case, and o ther assum ptions are quantified with great care. Events appearing at the                      evaluate d in a sensitivity stu dy.
top of lists based on different measures should be examined with great care; such a case may                      2.        Probabilistic weights, representing degree correspond to a critical function being unreliably                        of belief in each assum ption, are assigned perform ed. This would clearly warrant attention,                        to all possible assu m ptions and use d with both in m ode ling and pe rhap s in plant operation.                      the logic m odel s based on the ass um ptions .
The re are some applications for which importance measures are not suited. Generally, if conventional            In a Bayesian approach, such weights can be importance analysis suggests that a particular                  updated using any additional information that system, structure, and com ponent (SS C) is                    becomes available in the future.
3-86
: 3. Technical Activities Approach 1 represents the practice of a typical                        that none of the SSCs in para llel is "imp ortan t." It PRA.      Approach 2 represents an improved                          is possible fo r non e of the SS Cs in a critical approach which spec ifically addre ss th e                            function to show up as "im portant" in tables sensitivity of the issue to alternative assumptions                  calculated in the usua l way.
but requires more extensive effort. It has been success fully applied in the NUREG-1150 study                          The users of these im porta nce m eas ures have to (NRC, 1990) to som e of the issues in severe                          understand their definitions and limitations. Som e accident m odeling where exten sive expert opinion                    of the shortc om ings can be addre sse d with elicitation was perform ed.            Its NURE G-1150                additional sensitivity calculations. For exam ple, a application to Level 1 PRA issues is m ore lim ited in                lower truncation limit can be used to determine the scope.                                                                sen sitivity of the importa nce m eas ures . The joined importance of groups of components can also be Limitations of Importance Measures                                    calculated.      Relaxing requirements for those com pon ents that are individually ranked low should Single-event importance measures are sometimes                        be furthe r justified by dem onstratin g that the presented as if they were capable of ranking model                    combined risk impact would also be low.
param eters in an objective way. However, no single model parameter can be ranked in isolation;                    3.2.6.4 Tasks Interfaces the significance of ea ch param ete r de pends in general on the model structure and on the values                      The task related to initial quantification has the of all the other parameters. There are, of course,                    following interfaces:
many other param ete rs, and it is correspondingly infeasible to analyze sensitivity to all combinations                  All Internal Event Analytical Tasks. This task is the of variations of all parameters. All "sensitivity"                    first attempt to integrate all previous work, results (chiefly importance measures of one kind or                    especially all of the individual system m ode ls, into another) m ust be inte rpreted in light of this                        one consistent model whose framework was fundam enta l limitation.                                              developed in the event sequen ce m ode ling. As a practical m atter, this task also requires at least Particular instances of these limitations are:                        preliminary data, which emerge from a ssessment of hum an relia bility and com ponent reliability.
* Failure m ode s that are not m odeled                        Although described here as a single task, Initial cannot em erge as "sig nificant" from                        Quantification of Accident Sequences is part of an con ventional im porta nce ana lysis.                        iterative process invo lving all pre vious task s. In carrying out this task, it is generally nec ess ary to
* For any given model parameter, the                          app rox i m ate ( " tr u n c a t e ") th e s e q u e n c e associated importance m easures are                          expressions, and this approxim atio n is generally calculated conditional on all other model                    controlled through the qua ntification proc ess . The p a r a m e t e r s b e h a v in g e s s e n ti a l l y      proper modeling of each system conditional on the nom inally.                                                  states of other systems is revisited as the preliminary sequence results become available.
* W ithin the linked fault tree approach, the                  Iterating between the sequence models and the importance measures are calculated from                      system-level m odels takes place during this task to a truncated model (truncated collection of                  assure proper conditionality between systems and minimal cutsets) and are correspondingly                    to search for logic errors in sequence cutsets.
limited .                                                    Based on this preliminary quantification, priorities are to be reviewed, and add itional m ode ling or data These points sho w that conclusions based on                          refinement needs are assessed. In a subsequent importance measures m ust be weighted in light of                      task, leading contributors to sequence frequencies how the importance m eas ures were ca lculated. A                      are analyzed further to see whether recove ry given item m ay show up as "unimportant" because                      m odeling cha nge s the resu lts significantly. If so, it is logica lly in pa rallel with several other items                the sequence expressions are augmented to reflect (whic h can, therefore, com pensa te for its failure).                recovery.
Unfortun ate ly, these other item s are likely to show up as unimportant for the same reason, meaning                        The task related to final quantification has the 3-87
: 3. Technical Activities following interfaces:
* Com mon-Cause Failure Probabilities (effort allocated to quantification of All Internal Events Ana lytical Tasks. This task                        comm on-cause m odel param ete rs should integrates the res ults of a ll previous analysis tasks                  be a fun ction o f how importa nt these after they have been refined during the Initial                          param eters are, in the sense discussed Quantification of Accident S equ enc es.          It is                below),
assumed that debugging has been don e as part of
* Ini ti al  Quantification    of  Accident the initial ac cident seque nce qua ntification task .                  Sequences, and
* Fi nal    Qu anti fic atio n of  A ccident Level 2/3 Analyses.          Output from the Final                      Sequences.
Quantification task provides information on accident sequence definition and on frequency of              W hen all of the quantification tasks are occurrence directly to the Level 2 task (refer to              substan tially com plete, im portance re sults s hould Section 3.3) w hich in turn provides source term              be generated comprehensively and system atic ally inform ation to the consequence and risk integration          in order to support the discussion of insights task (refer to Section 3.4). W hether or not Level            generated for the final documentation. In addition, 2/3 analyses are performed depends on the scope                sen sitivity calculations can be perform ed to of the PRA (refer to Chapter 2).                              evaluate the risk impact of desig n im prov em ents and alternative modeling assumptions. In some The task related to sensitivity and importance                sim ple cases, sensitivity calculations can be analyses has the following interfaces:                        performed using the importance results.
During m odel developm ent, all of the major task              3.2.6.5 References activities will be perform ed itera tively; sens itivity and importance analyses are performed using the                Drouin, M., D ., et al., "Analysis of Core Damage model available at the time to prioritize the                  Frequency from Internal Events: Methodology resources.        After completion of the model                Gu idelines ," NURE G/CR-4550, Volume 1, developm ent, sensitivity and importance analyses              September 1987.
are performed to evaluate the impacts of alternative assumptions and changes in plant                  Ericson, D., et al., Analysis of Core Dam age design and operations on plant risks.                          Frequency:          Internal Events Me thod ology, NURE G/CR-4550, Vol. 1, Rev. 1, Sandia National The following discussion reflects the logical                  Laboratories, 1990.
hierarchy rather than the time ordering of the tasks.
Sensitivity analysis is discuss ed firs t becaus e its        NRC, The U se of PRA in Risk-Informed outcome has th e pote ntia l to change the way in              Application s, NU REG -1602, Draft Report for which the modeling is conducted. Importance                    Com ment, June 1997.
ana lysis is disc uss ed s eco nd.
NRC, Severe Accident Risks: An Assessment for Tasks who se o utpu ts are can didates fo r sen sitivity      Five U.S. Nuc lear Power Plants, NUREG -1150, stud ies include the fo llowing:                              U.S. Nuclear Regulatory Com mission, December 1990.
* Initiating Event Analysis (formulation of the m odel can be s ensitive to this),                  NRC, PRA Procedure Guides: A Guide to the Performance of Probabilistic Risk Assessments for
* Functional Analysis and Systems Success              Nuclear Power Plants, NUREG /CR-2300, U.S.
Criteria (changing success assum ptions              Nuclear Regulatory Com mission, January 1983.
can have major impacts), and Xue, D. and X. W ang, "A Practical Approach for
* System M odeling.                                    Phased Mission Analysis," Reliability Engineering and System Safety, 25, 333, 1989.
Tasks during which im portance analysis                is esp ecially beneficial includ e the following:
3-88
: 3. Technical Activities 3.3      Level 2 Analysis                                1.      A    structured    and  comprehen siv e evaluation of containment performance in (Probabilistic Accident                                  response to the accident sequence Progression and Source                                    identified from the Level 1 analysis.
Term Analysis)                                  2.      A    qu an titative  characterization    of radiological release to the environment The prim ary objective of the Level 2 portion of a                that would result from accident sequences PRA is to ch arac terize the potential for, and                    that involve leakage from the containment m agnitude of, a release of radioactive material                  pressure boundary.
from the reactor fuel to the environment given the occurrence of an accident that damages the                Figure 3.7 illustrates each of these elements and reactor core. To satis fy this obje ctive, a Level 2      indicates how they relate to each other PRA couples two major elements of analysis to a          conceptua lly.
completed Level 1 PRA:
Figure 3.7    Relationship among the major parts of a Level 2 PRA In an earlier version of this procedure guide            One type of containment performance assessment (NUREG /CR-6572, Vo l. 3 Part 1) the attributes of        in respons e to such ac cidents would be to perform a simplified approach to conducting the analyses          a determ inistic calculation with a validated, first-associated with each of the technical elements was        principles model of accident progression. Such a presented. This simplified approach is reproduced        calculation would generate a time-history of loads in Appendix B.                                            imposed on the conta inm ent pressure boundary.
These loads would then be compared against In the current version of the procedures guide the        structural performance limits of the containm ent.
attributes of comprehensive Level 2 PRA are              If the load s ex cee d the perform anc e lim its, the presented. A detailed description of the attributes      containment would be exp ecte d to fail; conversely, of conducting the technical analyses associated          if the perform ance limits surpass the calculated with a comprehensive Level 2 PRA is provided              loads, the containment would be expected to below.                                                    survive. In such an assessm ent, the overall 3-89
: 3. Technical Activities frequency of accidents resulting in a release to the        by several mechanisms such as overpressure, environment would simply be the frequency of                shell m elt-through and others.        Containment accident sequences in which the calculated                  bypass (0.1) could be the result of induced steam containment loads exceed the performance limits.            generator tube rupture (for PW Rs on ly). W hether the containment fails late (0.2) or not at all (0.2)
Unfortun ate ly, neither the current knowledge              depends on several factors including the ope rability regarding m any aspects of severe accident                  of containme nt heat removal systems. Once the progression nor (albeit to a lesser extent) the              probabilities of these containment failure modes knowledge regarding containment performance                  has been determined for each accident sequence, limits is sufficiently precise to conduct such an            the probabilities conditional on total core damage analysis. Rather, in a PRA , an assessment of                are c alculated.
containment performance is perform ed in a manner that ex plicitly considers im precise                The probability of early containm ent failure knowledge of severe accident behavior, the                  conditional on core dam age (CCFPef) is determined resulting challenges to containment integrity, and          by summ ing (i=16n) the early failure probabilities the capacity of the containment to withstand                for all accident s equence weighte d by their various cha llenges. There fore, the po tential for a        respective frequencies (F i). The summ ation is then release to the environment is typically expressed in        divided by the total core dam age freque ncy (CDF ).
terms of the conditional probability of containment failure (or bypass) for the spectrum of accident sequences (de term ined from Level 1 PRA ana lysis) that p roceed to core da m age .
Figure 3.8 indicates how th e co nditional probab ility      A similar approach is used to determine the of conta inm ent failure is calculated. For each            conditional prob abilities of bypas s ac cidents, late Level 1 core damage accident sequence                        containment failure and no containment failure.
(frequency, F i), the probability of the various containment failure modes are calculated. For                In addition to estimating the probability of a example, the pro bability of early containment              radiological release to the environment, the Level 2 failure (efi), contain m ent bypass (bp i), late            portion of a PRA of a nuclear reactor characterizes containment failu re (lf i) and no containment failure      the resulting release in terms of m agnitude, timing, (nfi) are determ ined. F or the exam ple show n in          and other attributes im porta nt to an assessment of Figure 3.8, Accident Sequence 1 completely                  off-s ite accident consequences. This information bypasses the containment and thus the conditional            has two purpo ses . First, it provides a quan titative probability of b ypass given the occurrence of this          scale for ranking the relative severity of various accident is unity. These characteristics could              accident sequences; secondly, it represents the result from an accident such as an interfacing              "source term " for a q uan titative evaluation of off-system LOCA. Alternatively, Accident Sequence 2              site con seq uen ces (i.e., health effects, prope rty could result in several different containm ent failure      dam age, etc.), which are estimated in the Level 3 modes or no containment failure. For this ac cident,        portion of a PRA (refer to Section 3.4).
the probability of early failure (0.5) could be caused 3-90
: 3. Technical Activities Figu re 3.8 Condition al probab ility of con tainm ent failure 3-91
: 3. Technical Activities This sec tion de scribes the attribute s of a L evel 2      the accident sequence. Therefore, a critical first PRA analysis, emphasizing the scope and level of            step is developing a structured process for defining detail associated with major elements of a Level 2          the specific accident conditions to be examined.
analysis, rather than the spec ific m etho ds u sed to      Attributes have to be determined of reducing the assem ble a prob abilistic m ode l. This approach is        large number of accident sequence developed for deliberately used because several different                Level 1 PRA analysis to a practical number for methods have be en u sed to gen erate and display          detailed Level 2 analysis.
the probabilistic aspects of severe accident behavior and con tainmen t perform ance. By far,            3.3.1.1 Assumption and Limitations the most com mon m ethods are those that use standard event and/or fault tree logic structures;          Because of the diversity and redundancy of sa fety howeve r, some practitioners use other techniques.          systems designed to prevent and/or m itigate Further, the specific way in which ostensibly similar      potential accident conditions in a nuclear plant, logic structures are organized and solved                  m ultiple failures m ust occur for an a ccident to (num erically) can differ substantially from one study      proceed far enough to damage the reactor fuel.
to another, primarily as a result of differences in        The primary purpose of a Level 1 PRA analysis is quantification techniques and associated computer          to identify the spec ific combinations of system or software offered by vendors of PRA services. In            component failures (i.e., accident sequence cut principle, any of these methods can be used to              sets ) that w ould allow core d am age to occur.
produce a Level 2 PRA provided that they encompass the scope and level of detail described          Unfortun ate ly, the number of cut sets generated by below.                                                      a Level 1 analysis is ve ry large (typica lly greater than 10,00 0). It is im practical to evaluate severe As indicated above, the two m ajor technical                accident progression and resulting containment activities of a Level 2 PRA are (1) determination of        loads for each of these cut sets. As a result, the the conditional probability of containment failure or      comm on prac tice is to g roup the Level 1 cut s ets bypass for accident seque nce s that proc eed to            into a sufficiently sm all num ber o f "plant damage core damage and (2) a characterization of the              states" to allow a practical assessm ent of the radiological source term to th e environm ent for          challenges to containment integrity resulting from each sequence resulting in containment failure or          the full spectrum of accident sequences.
bypass. These m ajo r technical activities are however composed of several component parts:                3.3.1.2 Produ cts
* Plant Dam age State Determination                In general, sufficient information should be
* Assessing Containment Challenges                  provided to allow an indepen den t analyst to
* Containment Performance                          reproduce the results. At a minimum , the following Characterization                                  products are expected
* Contain m ent Probabilistic Characterization                                  C        a thorough de scription of the procedure
* Radionuclide Release Characterization                      used to group (bin) individual accident
* Qu antifica tion of Results                                sequence cut sets into plant damage states, or other reduced set of accident Each of these technical activities are discuss ed in                  sc enarios for detailed Level 2 analysis the following section.
C        a listing of the specific attributes or rules 3.3.1 Plant Damage State                                              use d to group cut sets Determination C        a listing and/or computerized data base providing cros s referen ce fo r all cut sets to The primary objective of this task of a Level 2 PRA plant damage states and vice versa is to characterize the type and severity of cha llenges to con tainm ent inte grity that may arise during postulated severe acc idents. An ana lysis to        3.3.1.3 Analytical Tasks determine these characteristics acknowledges the dependence of containment response on details of            This technical activity involves two tasks:
3-92
: 3. Technical Activities
: 1.      Defining PDS Characteristics                      established a priori. Rather, a Level 2 PRA first
: 2.      PDS Binning                                      defines the attributes of an accident sequence that represent important initial or boundary conditions Each of these tasks are described in detail in the        to the assessment of severe accident progression following sections.                                        or containment response or characteristics of system operation that can have an important effect Task 1 - Defining PDS C haracteristics                    on the resulting environmental source term .
Exam ple attributes are shown in Table 3-18.
The number of plant damage states produced by this gro uping (or "binning") process cannot be Tab le 3-18 Exam ple attributes for g roup ing accid ent seq uenc e cut sets Attribute                                      Possible states Accident Initiator        C        Large, Intermediate, or Small LOCAs C        Trans ients C        LOC A outside the containm ent pressure b oundary C        Steam Gen erator Tube Rupture Reactor Coolant System    C        High (RCS) Pressure at the      C        Low Onset of Core Damage Status of Emergency        C        Op erate in injection mode, but fail upon switchover to Coolant Injection                  recirculation cooling Systems                    C        Fail to operate in injection mode Status of Steam            C        Au xiliary feedwa ter operate s/fails Gen erators                C        Secondary isolated/depressurized (PW Rs)
Status of Residual Heat    C        Op erate Rem oval Systems          C        Failed Status of Containment at  C        Isolated Onset of Core Damage      C        Not isolated Status of Containment      C        Sprays always operate/fail or are available if demanded Safeguard Systems          C        Sprays operate in injection mode, but fail upon switchover to recirculation cooling C        Fan coolers always operate/fail or are available if demanded C        Contain m ent ventin g syste m (s) op erate /fail C        Hydrogen control syste m (s) op erate /fail 3-93
: 3. Technical Activities The functional effect of the specific failures                C        Reco verability of "failed" systems after represented by the terms in each accident                              the onset of core damage. Typical sequence cut set are then mapped into possible                          recovery actions include restoration of AC plant dam age states ac cording to the binning                          power to active com ponents and alignment attributes. There is no "unique" list of attributes                    of nonsafety-grade systems to provide against which this exercise should be conducted                        (low-pressure) coolant injection to the for a Level 2 analysis; Table 3-18 sim ply provides                    reactor vessel or to operate containmen t examples, not an exhaus tive list. A com prehens ive                    sprays.      Constra ints on reco vera bility list of attributes for representative PW R and BW R                    (such as no cred it for repair of failed Level 2 analyses can be found in NUREG /CR-                            hardware) are defined in a manner that is 4551, Volume 3 (Breeding, 1990) and Volume 4                            consistent with recovery analysis in the (Payne, 1990), re spectively. Although many of                          Level 1 PRA.
these attributes can be applied generically across many different reactor/containment designs,                    C        The      interdependence        of various special attrib utes are often necessary to address                      system s for successful operation. For plant-specific design features (e.g., isolation                        exam ple, if successful operation of a low-condenser operatio n in certain BW Rs.) In a Level                      pressure coolant injec tion system is 2 PR A, an y characteristic of the p lant res pon se to                necessary to provide adequate suction a given initiating event that would influence either                    pressure for successful operation of a subsequent containment response or the resulting                        high-pressure coolant injection system, radionuclide source term to th e environm ent is                        failure of the low-pressure system (by any represented as an attribute in the plant damage                        m echanism ) autom atic ally renders the state binning scheme.          These characteristics                  high-pressure system unavailable. This include the following:                                                  information may only be indirectly available in the results of the Level 1 analysis, but is C          The status of sy stem s that have the                        explicitly rep resente d in the plant damage capac ity to inject water to either the                      state attributes if recovery of the low-reactor vessel or the containment                            pressure system (after the onset of core cavity. Defining system status simply as                    damage) is modeled.
failed or operating is not sufficient in a Level 2 analysis. Low-pressure injection            Task 2 - PDS Binning systems may be available but not operating at the onset of core damage              Several subtle aspects of the mapping of accident because they are "dead-he ade d" (i.e.,            sequence cut sets from the Le vel 1 analysis to reactor vessel press ure is above their            plant damage states used as input to a Level 2 shutoff head).        Such states are              ana lysis are worth noting at this point:
distinguished from "failed" low-pressure injection to account for the capability of          C        The entire core damage frequency dead-headed system s to discharge after                      generated by the Level 1 accident reactor vessel failure (i.e., providing a                    sequence ana lysis is carried fo rward into mechanism for flooding the reactor cavity).                  the Level 2 analysis. The reason for conserving the CDF is to allow capture of C          The status of s ys te ms that provide heat                  the risk contribution from low-frequency, removal fro m the reactor vessel or                          high-consequence accident sequences.
containment. Ca reful atte ntio n is paid to the interactions between such system s              C        The mapping is performed at the cut set and the coolant injection systems. For                      level, not the accident s equence level.
example, the status properly accounts for                    The re are several reasons for this level of limitations in the capability of dual-function              deta il:
systems such as the RHR system in most BW Rs (which provides pumping cap acity                      -        Depending on the level of d eta il for LPCI and heat removal for suppression                              represented in the Level 1 pool cooling).                                                        accident seq uen ce e vent trees, it may be im poss ible to properly 3-94
: 3. Technical Activities capture the effects of                    that preserves relevant support system suppo rt system failu res                  de pe nd en cie s . T h e s e a r e then and other dependencies                    num erically combined with the sequence a m o n g t h e va r i o us                cut set frequency from the Level 1 binning attributes without                analysis.
r e vie win g t h e b a s ic events that caused a              3.3.1.4 Task Interfaces system failure.
This task is the critical interface between the
  -        Recovery of failed systems after              Level 1 and Level 2 portions of the PRA. The the onset of core dam age is                  entire core damage frequency generated by the considered in the containment                Level 1 PRA is carried fo rward into th e Level 2 performance assessm ent of a                  analysis. The various core damage accident Level 2 PR A. Fo r this ac tivity to          sequences are grouped into a sma ller num ber of be modeled correctly, system                  plant damage states for processing through th e failures that are "recoverable" are          Level 2 analysis. These plant dam age states are distinguished from failures that              defined so that all of the accident sequences are "no t recoverable."          This        grouped into a particular plant damage state can information typically lies only              be treated the same in terms of accident with in the sequence cut sets.                progression analysis. The output of this task is a No te that the definition of                  set of plant dam age states with the corresponding recoverable is consistent with the            frequencies.
recovery analysis performed in the Level 1 PRA.                                  3.3.1.5 References
  -        To appropriately model human                  Breeding, R. J., e t al., Evaluation of Severe reliability related to operator              Accident Risks: Surry Unit 1, NURE G/CR-4551, actions that occur after the onset            Volume 3, SAND86-1309, Sandia National of core dam age, inform ation                Laboratories, October 1990.
r e g a r d in g    prior  o pera tor performance (i.e., prior to the              Payne, A. C., et al., Evaluation of Severe Accident onset of core damage) is carried              Risks: Peach Bottom U nit 2, NURE G/CR-4551, forward from the Level 1 analysis.            Volume 4, SAND86-1309, Sandia National Again, this inform atio n typically          Laboratories, December 1990.
lies only within sequence cut sets.
3.3.2 Assessing Containment C For some accident sequences, the status of all systems may not be determined from Challenges the sequence cut sets. For example, if the success criteria for a larg e break LO CA in            This Level 2 PRA task has two objectives:
a PW R req uire successful accumulator operation, the large LOCA sequence cut                  1.      Assess the reliability of containmen t sets involving failu re of a ll accum ulators                    systems during severe accidents, and will contain no information about the status of other coolant injec tion systems.                    2.      Ch arac terize severe accident progression How ever, realistic resolution of the status                    and the a ttend ant challenges to of such systems often provides a                                conta inm ent inte grity.
m echanism for representing accident sequences that are arrested before                      3.3.2.1 Assumptions and Limitations substantial core damage and radionuclide release occur. In a Level 2 analysis, these            The reliability of systems whose prim ary fun ctio n is system s are n ot sim ply ass um ed to                  to m aintain containment integrity during accident ope rate as designed . Rather, their failure            conditions is incorporated into the accident frequencies are estimated in a manner                  sequence analysis performed during a Level 1 3-95
: 3. Technical Activities PRA. Such system s m ay include containment                          untested.
isolation, fan coolers, distributed sprays, and hydrogen igniters. An ass ess m ent of the re liability      2.      None of the integral severe accident codes of these system s is incorporated into a Level 2                      conta in m ode ls to rep resent all accident analysis to ascertain whether they wo uld op erate                    phenomena of interest. For example, as designed to mitigate containment response                          mod els for ce rta in h ydr od yn am ic during core damage accidents. The methods,                            phenomena such as buoyant plumes, scope, and technical rigor used to evaluate the                      intra-volume natural circulation, and gas-reliability of these system s are com para ble to those              phase stratification , are not represente d in used in the Level 1 analysis of other "front-line"                    most integral com puter codes. S im ilarly, system s (refer to Section 3.2.3).                                    certain severe accident phenomena, such as dynam ic fu el-coolant intera ctions (i.e.,
The element of a Level 2 PRA that often receives                      s t e a m e x p l o s io n s ) a n d hyd r o g en the most attention is the evaluation of severe                        detonations, are not represented.
accident progression and the attendant challenges to containment integrity.          This is because          3.      It is simply impractical to perform an considerable tim e and effort can be spent                            integral calculation fo r all severe accident performing computer code calculations of dominant                    seq uen ces of interest.
accident sequences. Further, exercising broad-scope accident analysis codes [such as the                  As a result, the proce ss of evaluating severe Modular Ac cident An alysis Program (MAAP)                  accident progression involves a strategic blend of (EP RI, 1994) or MELCO R (Summ ers, 1994)                    pla nt-specific code calculations, applications of provides the only fram ework within which the                analyses performed in other prior PRAs or severe important interactions among severe accident                accident studies, focused engineering analyses of phenomena can be acc ounte d fo r in an integrated          particular issues, and experimental data. The fashion.      Consequently, the results of these            manner in which each of these sources of calculations typically form the principal basis for          information are used in a Level 2 PRA is described estimating the timing of major accident events and          below.
for characterizing a range of potential containment loads.                                                      3.3.2.2 Produ cts Although code calculations are an essential part of          In general, sufficient inform ation in the an evaluation of severe accident progress ion, the ir        documentation of assessing containment system results do not form the sole basis for characterizing        challenges is provided to allow an independent challenges to containment integrity in a Level 2            analyst to reproduce the results. At a minimum ,
PRA. There are several reasons for this:                    the following information is documented:
: 1.        Many of the m odels em bodied in severe          For the activities related to assessing the reliability accident analysis codes addre ss highly          of containment systems:
uncertain phenomena. In each case, certain assumptions are made (either by          C        a description of inform ation u sed to the m odel developers or the code user)                    develop conta inm ent sys tem s' analysis regarding con trolling physical processes                  m odels and link them with oth er system and the appropriate formulation of m odels                reliability models (This docum entatio n is that represent them. In some instances,                    prepared in the same m anner as that the importance of these assumptions can                    generated in Level 1 analysis of other be tested via parametric analysis.                        system s as discus sed Se ction 3.2.3).
How ever, the extent to which the results of any code calculation can be demonstrated          For the activities related to charac terizing severe to be ro bus t in light of the num erous          accident progression:
uncertainties involved is severely limited by practical constraints of time and              C        a description of plant-specific accident resources. Therefore, the assumptions                      simulation models (e.g., for MAAP [EPRI, inherent in m any code m odels rem ain                    1994] or MELCOR [Sum m ers, 1994])
3-96
: 3. Technical Activities including extens ive referen ces to      Ta sk 1 - Con tainment Sys tem Analysis source documentation for input data                                    Fa ult tree models (or other techniques) for estimating failure probabilities are developed and C        a listing of all computer code calculations        linked directly to the accident se quence m odels performed and used as a basis for                  from the Level 1 PR A. T his linkage is nec ess ary to quantifying any event in the containment          properly capture the important influence of mutual probabilistic logic model including a unique      dependencies between failure mechanisms for calculation identifier or name, a description      containment systems and other systems. Obvious of key mode ling assum ptions or inpu t data      examples include support system dependencies, used, and a reference to documentation of          such as electrical power, com ponent coo ling water, calculated results (If input and/or output        and instrum ent/contro l air. Other dependencies data are archived for quality assurance            that need to be represented in a manner consistent records or other purposes, an appro priate        with the Level 1 syste m m odels are more subtle, reference to calculation archive rec ords is      however, as illustrated by the following examples:
also provided.)
C        Indirect failure of containment systems C        a description of key modeling assumptions                  caused by harsh environmental conditions selected as the basis for performing "base                  (resulting from failure of a support system) case" or "best-estimate" calculations of                    are represented in the assessment of plant response and a description of the                    containment system reliability.            An technical bases for these assumptions                      exam ple is failure of reactor or auxiliary building room cooling causing the failure of C        a description of plant-specific calculations                containment system s because of high performed to examine the effects of                        ambient temperatures.
altern ate mo d e ling approaches or assumptions                                        C        The influence of containment system operation prior to the onset of core C        if analyses of a surrogate (i.e., 'sim ilar')              damage is acc ounte d fo r in the evaluation plant are used as a basis for                              of system operability after the onset of characterizing any aspect of severe                        core damage. For example, consider an accident progression in the plant being                    accident sequence in which containment analyzed, references to, or copies of                      sp rays succ es sfully in itiate on an documentation of the original analysis, and                autom atic signal early in an accident a description of the technical basis for                    sequence. If later in the sequence (but ass um ing ap plicab ility of res ults                      prior to the onset of core damage) emergency operating procedures direct C        for    all other      original engineering                  reactor operators to terminate containment calculations, a suffic ien tly co m ple te                  spray operation to allow realignment of desc ription of the analysis method,                        emergency coolant injection systems, the assumptions and calculated res ults is                      configuration of the containment spray prepared to accommodate an independent                      system (and thus its reliability) differ from (peer) review                                              a sequence in which containm ent sp rays wo uld not have bee n de m and ed p rior to 3.3.2.3 Analytical Tasks                                            the onset of core damage.
This technical activity involves two tasks:                C        The human reliability analysis associated with m anual actuation of containment
: 1.      Contain m ent Sys tem Analysis                              systems (e.g., hydrogen igniters) acc oun ts
: 2.      Evaluation of Severe Accident Progression                  for operator perform ance during earlier stages of an accident sequence. T his Each of these tasks are de sc ribed in detail in the                analysis follo ws the sam e practic es used following sections.                                                  in the Level 1 analysis as described in Section 3.2.5.
3-97
: 3. Technical Activities The long-term performance of containment                              address sequences that are anticipated to systems is also evaluated although the issues to be                  result in relatively high radiological considered m ay differ sub stan tially from those                    releases (e.g., c ontainm ent bypass listed above.        T his evaluation accounts for                    scena rios).
degradation of the environment within which system s are required to operate as an accident              C        In addition to the calculations of a sequence proceeds in tim e. Exam ples of factors                      spectrum of accident sequences described that m ay arise after the onset of core damage                        above, several sensitivity calculations are include:                                                              performed to exam ine the effects of major uncertainties on calculated accident C        loss of net positive suction head (NPSH )                    behavior.          For example, multiple for coo lant pu m ps d ue to suppression pool                calculations of a single sequen ce are heat up in BWRs                                              performed in which code input param eters are changed to inves tigate the effects of C        plugging of fan cooler inlet plena as a                      alternative assumptions regarding the result of the acc um ulation of a erosols                    timing of stochastic events (such as (generated perhaps as a consequence of                      operator actions to restore water injection),
core-concrete interactions) in PWRs                          or the m odels used to represent uncertain phenomena (such as the size of the C        failure of system s with com pon ents                        opening in containme nt following over-internal to the containment pressure                        pressure failure).        These calculations bounda ry as a result of high temperatures                  provide information that is essential to the or pressure associated with hydrogen                        quantitative characterization of unc ertainty combustion                                                  in the Level 2 probabilistic logic m odels (refer to the discussion of logic model In all cases, the as ses sm ent of failure prob ability              d e v e lo p m e n t a n d a s s ig n m ent o f for containment systems are based on re alistic                      probabilities below).
equipment performan ce limits rather than bounding (design-basis or equipment qualification) criteria.          Table 3-19 lists phenomena that can occur during a core m eltdown accident and which involve T ask 2 - Evaluation of Severe Accident                      considerable uncertainty. This list was based on Progression                                                  inform ation in NUR EG -1265 (N RC , 1991),
NUREG/CR-4551 (Gorham-Bergeron, 1993) and The following are u sed to determine the number of          other studies. It is recognized that c onsiderable plant specific calculations that would be performed          disagreement persists within the technical using an integral code to support a Level 2 PRA:            com m unity regarding the magnitude (and in some cases, the specific source) of uncertainty in several C        At      least    one    integral  calculation      of the phenomena listed in Table 3-19. A major (addressing the complete time domain of            objective of the expert panels assembled as part of severe accident progression) is performed          the research program that culminated in NUREG-for each plant damage state. However,              1150 (NRC, 1990) was to translate the range of this may not be practical depending on the          technical opinions within the severe accident number of plant damage states developed            research com m unity into a quantitative m easure of according to the above discussion. At a            unc ertainty in specific technical issues. In a Level m inim um , calculations are perform ed to          2 PRA, the results of this effort are used as address the dominant accident sequences            guidance for defining the range of values of (i.e., those with the highest contribution to      uncertain m odeling parameters to be used in the the total core damage frequency).                  sensitivity calculations described above.
Calculations are also pe rform ed to 3-98
: 3. Technical Activities Table 3-19    Severe accident phenomena Phenomena                            Characteristics of accident phenom ena Hydrogen generation        C        Enhanced steam generation from m elt/debris relocation and combustion            C        Steam starvation caused by degraded fuel assembly flow blockage C        Clad ballooning C        Recovery of coolant injection systems C        Steam/hydrogen distribution within containment C        De-inerting due to steam condensation or spray operation Induced failure of        C        Natural circulation flow patterns within the reactor vessel the reactor coolant                  upper plenum , hot legs, and steam generators system pressure            C        Creep rupture of hot leg nozzles, pressurizer surge line, and bounda ry                            steam generator U-tubes Debris bed                C        Debris spreading/depth on the containment floor coolability and core-      C        Crust formation at debris bed surface and effects on heat concrete interactions                transfer C        Debris fragmentation and cooling upon contact with water pools C        Steam generation and debris oxidation Fuel coolant              C        Potential for dynamic loads to bounding structures interactions              C        Hydrogen generation during melt-coolant interaction Melt/debris ejection      C        Melt/debris state and composition in the lower head following reactor          C        Mod e of lower head failure vessel failure            C        Debris dispersa l and heat transfer following high-pressure melt ejection A fundam ental design objective of the integral                  b y compari sons          wi th  m e c h a n i s t ic code severe accident analysis codes us ed to suppo rt                calculations.
Level 2 PRA (e.g., MAAP, MELCOR ) is that they be fast ru nning.      Efficient co de operatio n is            The re are obvious practical benefits to applying or necessary to allow sensitivity calculations to be                adapting results of completed studies of severe performed with in a rea sonably short tim e and with            accident prog ression in other plants to the PRA of minimal resources. One consequence of this                      interest. If the applicability of such studies can be objective, however, is that many complex                        dem ons trated, substantial savings can be achieved phenomena are m ode led in a relatively sim ple                  by elim inating unnecessary (repetitive) analysis.
manner or, in some cases, are not represented at                Application of analyses from studies of similar all. Therefore, a state-of-the-art Level 2 PRA                  plants is com m on in Level 2 PRA s. However, such addresses the inherent limitations of integral code              analyses can not completely supplant the plant-calculations in two re spe cts. F irst, the importance          specific evaluations described above.
of phenomena not represented by the integral codes are e valua ted by som e other m ean s (i.e.,              Th e pre requ isite for a pplying re sults of studies for either app lication o f spe cialized c om puta tional            another plant is a demo nstration of sim ilarity in m odels or ex perim enta l investig atio n). Se condly,          plant design and operational characteristics such the effects of modeling simplification are examined              that the sam e res ults would be generated if plant-3-99
: 3. Technical Activities specific analyses were performed. Dem onstration                  effects of diffe renc es in these des ign features is of similarity involves a direct comparison of key                examined, and techniques fo r ada pting or scaling plant design features and, if necessary, scaling                  the results of the surrogate analyses developed.
analysis. Examples of features to be included in such a com parison are listed in Table 3-20. The Tab le 3-20 Exam ple plant d esign/op erational param eters to be com pared to demon strate sim ilarity fo r use as surrog ate a nalysis Component                              Design characteristics of component Reac tor Core                  C        Nom inal Power C        Num ber of Fuel Assemblies C        Num ber of Fu el R ods per As sem bly C        Core Mass (UO 2, Cladding, Misc. support structures)
Reactor Vessel                C        Inside Diameter C        Height C        Nom inal Operating Pressu re C        Num ber of Safety/Pressure Relief Valves C        Safety / Re lief Valve relief valve design flow ra te C        Reactor Coolant System Liquid Volume Containment                    C        Total Free Volume C        Design P ressure C        Nom inal Internal Operating Pres sure C        Atmosphere composition C        Reactor Cavity Floor Area C        Penetration arrangement and construction C        W ater C apa city befo re Spill-over into Reac tor Cavity C        Concrete (floor) composition In sum m ary, eva luatin g s e v e re accident                    Task 2 has a critical interface with the plant progression involves a com plex process of p lant-                d a m a g e s t a te d e t e rm i n a t io n ( r e f e r to specific sensitivity studies using integral codes,                Section 3.3.1). For each of the plant damage m echanistic code calculations, use of prior                      states defined in Section 3.3.1, an evaluation of the calculations, experimen tal data and expert                      severe accident progression would be pe rform ed in judg em ent. Ex am ples of this process are given in              Ta sk 2.
Ap pendix B for each of the phenomena liste d in Table 3-19 above.                                                The output of these tasks is used together with the analyses perform ed in Section 3.3.3 to develop a 3.3.2.4 Task Interfaces                                          range of potential containment failure modes and their corresponding frequencies.
Task 1 assesses the reliability of containment systems for those severe accidents identified in the              3.3.2.5 References Level 1 PRA.        Fault tree models (or other techniques) for estim atin g fa ilure pro babilities are          EPRI, MAAP4 - Modular Ac cident An alysis developed and linked directly to the accident                    Program for LWR Power Plants, RP3131-02, sequence models from the Level 1 PRA.
3-100
: 3. Technical Activities Volumes 1-4, Electric Power Research Institute,              PRAs for other pla nts to dete rm ine their 1994.                                                        applicability to the current design. Such a list was incorporated into NUREG-1335 (NRC, 1989), the Sum mers, R. M., et al., MELCOR Com puter Code              NR C's guidance for performing an IPE. Th is Manuals - Version 1.8.3, NURE G/CR-6119,                    review is then supplemented by a systematic SAND93-2185, Volum es 1 -2, Sa ndia National                  examination of plant-specific design features and Laboratories, 1994.                                          emergency operating pro cedures to ascertain whether additional, unique failure mod es are NRC, Uncertainty Papers on Severe Accident                  conceivable. For each plausible failure mode, Source Terms, NUREG -1265, U.S. Nuclear                      containment perform ance an alyses are performed Regulatory Com mission, 1991.                                using validated structural res ponse m odels, as well as plant-specific data for structural materials and Gorham-G ergeron, E. D., et al., Evaluation of              their properties.
Severe Accident Risk s: Method ology for the Accident Progre ssion, Source T erm ,                        Unfortun ate ly, current models for the response of Consequence, Risk Integration, and Uncertainty                complex structures to even "simple" loads (such as An alyses , NURE G/CR-4551, SAND86-1309,                    internal pressure) are no t sufficiently robust to Sandia National Laboratories, December 1993.                  allow simultaneous prediction of a fa ilure threshold and resulting failure size. T his is particularly true NRC, Severe Accident Risks: An Assessment for                for structures composed of non-homogeneous Five U.S. Nuclear Power Plants, NUREG -1150,                m ate rials with highly non-linear mechanical Volume 1, Main Report, U.S. Nuclear Regulation                properties such as reinforced concrete. As a Com mission, 1990.                                            result, calculations to estab lish perform anc e lim its are suppl emented with information from experimental observations of con tainmen t failure 3.3.3 Containment Performance                                characteristics and exp ert jud gm ent. Examples of this process can be found in Task 2 below.
Characteristics 3.3.3.2 Produ cts The objective of this element of a Level 2 PR A is to determine the lim its (or capa city) that the In general, sufficie nt in form ation in the containment can withstand given the range and documentation of analyses performed to establish magnitude of the potential challenges. T hese quantitative conta inm ent perform ance lim its is challenges take many forms, including internal provided that allow s an indep end ent analyst to pressure rises (that occur over a sufficiently long reproduce the results. At a minimum , the following tim e fram e that th ey can be considered "s tatic " in information is documented for a PRA:
terms of the structural response of the containm ent), high temperatures, therm o-C        a general description of the containment mechanical erosion of concrete structures, and structure including illustrative figures to under some circumstances, localized dynam ic indica te the ge ne ra l co nf igu ra tion, loads such as shock w aves and internally penetration types and location, and major generated m issiles. Rea listic estimates for the constructio n m ate rials capac ity of the containm ent structure to withstand these challenges are generated to provide a m etric C        a desc ription of the modeling approach against which the likelihood of co ntainme nt failure used to calculate or otherwise define can be estimated.
conta inm ent failure criteria 3.3.3.1 Assumptions and Limitations C        if com pute r m ode ls are use d (e.g ., finite element analysis to establish over-A thorough ass essm ent of c ontainmen t pressure failure criteria), a description of performance generally begins with a structured the way in which the containment structure process of identifying potential containment failure is nodalized including a specific discussion modes (i.e., mechanisms by which integrity might of how local discontinuities , such as be violated). This assessment comm only begins penetrations, are addressed by reviewing a list of failure m odes identified in 3-101
: 3. Technical Activities C          if experimentally-determ ined failure d ata                  For many containm ent designs, over-press ure has are used, a sufficiently detailed description                been found to be a dominant failure mechanism .
of the experimental conditions to                            In a state-of-the-art Level 2 PRA, the evaluation of dem ons trate app licability of results to                    ultim ate pressure capacity is performed using a plant-specific containment structures                        plant-specific, finite-element m odel of the containment pressure boundary including sufficient 3.3.3.3 Analytical Tasks                                                  deta il to represent major discontinuities such as those listed above. The influence of time-varying This technical activity involves two tasks:                              containment atmosphere tem peratures is taken into account by performing the calculation for a
: 1.          Contain m ent Structu ral Analysis                            reasonable range of interna l tem pera tures . To the
: 2.          Contain m ent Fa ilure Mode Analysis                          extent that internal temperatures are anticipated to be elevated fo r long periods o f tim e (e.g., during Each of these tasks are described in detail in the                        the pe r io d o f a g g re s si ve core-concrete following sections.                                                      interactions), thermal growth and creep rupture of steel con tainm ent structu res is taken into acc oun t.
Ta sk 1 - Con tainment Stru ctu ral Analysis Ta sk 2 - Con tainment Failure M od e Analysis In a Level 2 P RA , the attributes of the analyses n e c e s s a r y t o c h a ra c t e ri ze c o n ta i n m e n t          The cha racterization of co ntainm ent performance performance limits are consistent with those of the                      limits is not sim ply a m atte r of defining a threshold containment load analyses against which they will                        load at which the structure "fails." A Level 2 PRA be compared:                                                              attem pts to distinguish between structural damage that results in "catastrophic failure" of the C          They focus on plant-specific containment                      containment from damage that results in significant performance (i.e., application of reference                  leakage4 to the environment. Leakage is often plant analyses is generally inadequate).                      characterized by a smaller opening (i.e., one that may not preclude subsequent increases in C          They consider design details of the                          containment pressure). Failure to isolate the containment structure such as:                                containment is also considered. It is very important to assess both the location and size of the
            -        containment type (free-standing                      containment failure because of the implications for steel shell; concrete-backed steel                  the source term calculation, e.g., given the same s h e l l ; p r e - s tr e s s e d , p o s t -      in-vessel and ex-vessel releases in sid e tensioned, or reinforced concrete)                  con tainm ent, a rup ture in th e drywe ll of a Mark II
            -        the full range of penetration sizes,                containment would typically result in higher types, and their dis tributio n                      releases to the environment than a leak in the
( e q u i p m e n t a n d p e r s o n n el          we twe ll.
hatc hes, pip ing pe ne trations, electrical penetration assemblies,                  The NURE G-1150 Expert Panel for Structural ventilation penetrations)                            Response Issues assessed the containment
            -        penetration seal configuration and                  overpressure failure issue for the Peach Bottom m ate rials                                          (Payne, 1990), Sequ oyah (Grego ry, 1990), Surry
            -        discontinuities in the containment                  (Breeding, 1990) and Zion plants (Park, 1993).
structure (shape transitions, w all                  The assessments of the expert panel are anchorage to floors, ch anges in                    documented in NU RE G/C R-4 551 , Volume 2, Part 3 steel shell or                  c o n c re te      (Breeding, 1990). Two of these plants have free-reinfo rcem ent)                                    standing steel containments and two have reinforced concrete containm ents . In add ition to C          They consider interactions between the containment struc ture and neighboring structures (the reactor vessel and                            4 Significant leakage is defined relative to the design pedesta l, auxiliary building(s), and internal                basis leakage for the plant. Leakage rates greater walls).                                                      than 100 times the design basis have been found risk significant in past studies.
3-102
: 3. Technical Activities the distributions the expert panel provided for              severe accident progress ion would be perform ed in overpress ure failure loads for these containment            Task 2 of Section 3.3.2. This inform atio n is structures, the panel also provided conditional              needed to charac terize containment performance.
probabilities for failure locatio n and failure mode (leak, ruptu re or catastrop hic rupture ).      Both      The output of these tasks is used together with the containmen t types were considered to be                    analyses performed in Section 3.3.2 to develop a vulnerable to the p ropa gation of crack s into              range of potential containment failure modes and ruptures. For a single containment, the panel                their corresponding frequencies.
assessed the conditional pro bability of m ultiple failure locations and sizes . Fo r ex am ple, six            3.3.3.5 References different location/size failures (failure mod es) were obtained for overpressure failure for the Peach              NRC, Individual Plant Examination: Subm ittal Bottom containment: (1) wetwell leak, (2) rupture,          Guidance, NURE G-1335, U.S. Nuclear Regulatory no suppression pool bypass (discontinuity strains            Com mission, August 1989.
at T-stiffeners), (3) wetwell rupture, suppression pool bypass (m em brane failure), (4) drywell leak          NRC, Severe Accident Risks: An Assessment for (bending strain at the downcom ers), (5) drywe ll            Five U.S. Nuc lear Power Plants, NU REG -1150, head leak (gasket failure), and (6) drywell rupture          U.S . Nuclear Regulatory Com mission, Decem ber (in m ain body near penetration due to loss of              1990.
concrete w all back suppo rt).
Breeding, R. J., et al., Evaluation of Severe Failure location and size by dynamic pressure                Accident Risks: Quantification of Major Input loads and internally generated missiles are also            Parameters, Experts: Determination of Structural probabilistic ally examined. The structural response        Response Issues, NUREG /CR-4551, Volume 2, expert pan el for N UR EG -115 0 as ses sed the size        Part 3, Sandia National Laboratories, October and location of the containment breach by dynam ic          1990.
pressure loads for Grand Gulf (Brown, 1990)
(reinforced concrete) and Sequoyah (free-standing            Brown, T. D ., et al., Evaluation of Severe Accident steel). Both leaks and ruptures were predicted to            Risks: Grand Gulf Unit 1, NUREG /CR-4551, occur in the containment response to detonations            Volume 6, SAND86-1309, Sandia National at Grand Gulf, and ruptures were predicted to                Laboratories, December 1990.
occur at Sequoyah. Alpha mode failure (for all NURE G-1150 plants) and steel shell melt-through            Payne, A. C ., Evaluation of Severe Accident of a containment wall by direct contact of core              Risks: Peach Bottom U nit 2, NURE G/CR-4551, debris (for Peach B ottom a nd Seq uoyah) were              Volume 4, SAND86-1309, Sandia National treated as rupture failu res of contain m ent in            Laboratories, December 1990.
NU RE G-115 0.
Gregory, J. J., et al., Evaluation of Severe Basemat m elt-through is generally treated as a              Accident Risks: Sequoyah Unit 1, NUREG/CR-leak in most Level 2 PRAs because of the                    4551, Volume 5, SAND86-1309, Sandia National protracted times involved as well as the predicted          Laboratories, December 1990.
radionuclide retention in the soil. If a bypass of con tainm ent, such as an interfacing systems                Park, C. K., Evaluation of Severe Accident Risks:
LOCA, is predicted to occur, then its effective size        Zion Unit 1, NUREG /CR-4551, Volume 7, BNL-and location (e.g ., probability tha t the bre ak is        NURE G-52029, Brookh aven Na tion al Laborato ry, submerged in water) are also estim ated in orde r to        March 1993.
perform the source term calculations.
3.3.3.4 Task Interfaces These tasks have a critical interface w ith assessing containment challenges (refer to Section 3.3.2). For each of the plant damage states defined in Section 3.3.1, an evaluation of the 3-103
: 3. Technical Activities 3.3.4 Containment                  Probabilistic                          other logic formats are provided to illustrate the logic hierarchy and event Characterization dep end enc ies.)
3.3.4.1 Assumptions and Limitations C        a des cription of the technical basis (with complete references to documentation of One feature that distinguishes a state-of-the-art original engineering analyses) for the Level 2 PRA from other, less com prehens ive assignment of all probabilities or ass ess m ents is the way in which unc ertainties are prob ability distributio ns with the logic represented in the characterization of containment structure performance 5. In particular, explicit and quan titative recognition is given to uncertainties in the individual C        a description of the ra tionale use d to processes and param eters that influence severe assign probability values to phenomena or accident behavior and attendant containment eve nts involving subjective, expert performanc e.        These uncertainties are then judgment quantitatively integrated by mean s of a pro babilistic logic structure that allows the conditional probability C        a description of the computer program of conta inm ent failure to be quantita tively used to exercise the logic model and estimated, as well as the uncertainty in the calculate final res ults conta inm ent failure pro bability.
3.3.4.3 Analytical Tasks Two eleme nts of such a n asses sm ent are described below. First, the characteristics of the This technical activity involves two tasks:
logic structure (i.e., containme nt event tree) used to organize the various contributors to uncertainty
: 1.      Containment Event Tree Construction are described. However, the major distinguishing
: 2.      Containment Event Tree Quantification element of a fu ll-scop e ap proa ch to characterizing containment performance is the manner in which Each of these tas ks is described in detail in the the CE T is qua ntified. T hat is wh ether or not following sections.
unc ertainty distributions for major events are assigned and propagated through the logic m odel.
Task 1 - Containment Event Tree Construction The key phrase here is uncertainty distributions (i.e., point estimates of probability are not The primary function of a "containm ent event tree,"
un ive rs ally applied to th e lo gic m od el) .
or any other probabilistic model evaluating Characteristics of these distributions and the containment performance, is to provide a manne r in which they are used in a typical logic structured framework for organizing and ranking model are described later in this section.
the alternative accident progressions that may evolve from a given core damage sequence . In 3.3.4.2 Produ cts developing this framework, whether it be in the form of a n event tree, fault tree or o the r log ic The following do cum enta tion is ge nera ted to structure, several elements are necessary to allow describe the process by which the conditional a ri g o ro u s a s s e s s m e n t o f c o n ta i n m e nt probability of containment failure is calculated:
performance:
C        a listing and description of the structure of C        Ex plicit rec ognition of the im portant tim e the overall logic model used to assem ble phases of severe accident progression.
the p ro b a b il is tic re p re s e ntation of Different phenomena m ay control the containment perform ance              (G raphical nature and intens ity of challenges to displays of events trees, fault trees or containment integrity and the release and transport of radionuclides as an accident proceeds in time. The following tim e 5
Uncertainties in the estimation of fission product                      frames are of particular interest to a source terms are also represented in a full-scope                          Level 2 an alysis:
Level 2 PRA; however, this topic is discussed in Section 3.3.5.
3-104
: 3. Technical Activities
  -        After the initiating event, but                    during several different time fram es of a before the onset of core damage.                  severe accident.          How ever, ce rtain This time period establishes                      limitations apply to the com posite (integral) im portant initial conditions for                  contribution of some phenomena over the containment respon se after core                  entire accident sequence and thes e are damage begins.                                    represented in the form ulation of a prob abilistic m ode l.
  -        After the core damage begins, but prior to failure of the reactor                    A good ex am ple is hydrogen combustion vessel lower head. This period is                  in a PW R containment.            Hydrogen characterized by core damage                      generated during core degradation can be and radionuclide release (from                    released to the c onta inm ent over several fuel) while core m ate rial is                    tim e periods. H owe ver, an important confined with in the rea cto r vess el.            contribution to t h e unc er tain ty in containment loads generated by a
  -        Im m ediate ly following reactor                  combustion event is the total mass of vessel failure. Prior analyses of                  hydrogen involved in a pa rtic ula r containment performance suggest                    combustion event. One possibility is that that many of the important                        hydrogen released to the containment over c h all e n g e s t o c o n ta i n m e n t        the entire in-vessel core damage period is integr ity o c c u r im m e d i a t e ly          allowed to accumulate without being following rea cto r vess el failure.              burned (perhap s) as a res ult of the These challenges may be short-                    absence of a sufficiently strong ignition lived, but often occur only as a                  source. Molte n core debris released to the direct consequence of the release                  reactor cavity at vess el breach could of molten core materials from the                  represent a strong ignition source, which re a c t o r v e s s e l i m m e d i a te ly      wo uld initiate a large burn (assuming the following lower head failure.                      cavity atmo sphere is not steam inert).
Because of the mas s of hydrogen
  -        Long-term accident beha vior.                      involved, this com bustio n event might S om e accident sequences evolve                  challenge containment integrity. Another rather slowly and generate                        poss ibility is that while the same total re la tive ly b e n i gn l o a ds to              amou nt of hydrogen is being released to containment structures early in                    the containm ent during in-vessel core t h e a c c i d e n t p r o g r e s s io n .      degradation, a sufficiently strong ignition How ever, in the absence of som e                  source exists to cause several small burns mechanism by which energy                          to occur prior to vessel breach. In this generated with in the containment                  case, the m ass of hyd rogen re m aining in can be safely rejected to the                      the containm ent atmosphere at vessel environm ent, these loads may                      breach would be very small in comparison ste adily increase to the point of                to the first case, and the like lihood of a failure in the long-term.                          significant challenge to containment integr ity at th at tim e shoul d be W hen link ed end-to-end, th ese tim e                      correspondingly lower.      Therefore, the frames constitute the outline for most                      logic for evaluating the probability of probabilistic containment performance                      containment failure associated with a large models.        W ithin each time fram e,                    combustion event occurring at the time of uncertainties in the occ urrence or inten sity              vessel breach is able to distinguish these of  g o v e r n in g    phenomena            are          two cases and prec lude the poss ibility of a systematically evaluated.                                  large combustion event if hydrogen was consumed during an earlier time fram e.
C Consistency in the treatmen t of severe accident events from one tim e fram e to another. Many phenom ena m ay occur 3-105
: 3. Technical Activities C        Recognition of the interdependencies of              Am ong its w eakn esses, th is approach sim ply phenomena.          Most severe accident              prod uce s a point es timate of p robability and is not phenomena and ass ociated events require              a rigorous techniq ue fo r developing proba bility certain initial or boundary conditions to be          distributions.
releva nt. For example, a steam explosion can only occur if molten core debris comes            The second technique involves a convolution of in contact with a pool of water. Therefore,          paired probability density function s.          In this it may not be m eaningful to consider ex-            technique, probability density functions are vessel steam explosions during accident              developed to represent the distribution of c redible scenarios in which the drywell floor (BW R)          values for a p aram eter o f interest (e.g.,
or rea cto r cavity (PW R) is d ry at the tim e      containment pressure load) and fo r its of vessel breach.        Logic models for            corresponding failure c riterion (e .g., ultim ate evaluating containment performance                    pressure capacity). This m eth od is m ore rigorous capture these and many other such                    than the one described above in the sense that it interdependencies among severe accident              explicitly represents the uncertainty in eac h qu antity eve nts and phenomena.                Explicit      in the probabilistic model. The basis for developing representation of these interdependencies            these distributio ns is the collective set of provides the mechanism for allowing                  inform ation generated from plant-specific integral com plete traceability between a particular          code calc ula tion s, c orresp on din g se nsitivity accident seq uen ce (o r plant damage state)          calc ulatio n s , oth er re levan t m ech anis tic and a specific containment failure mode.              calculations, experim enta l obse rvation s, and expert judg m ent.      Th e conditional prob ab ility of T a s k 2 - C o n t a in m e n t        E v ent    T ree        containment failure (for a given accident sequence)
Quantification                                                  is then calculated as the intersection of the tw o density functions (see Figure 3.9).
The re are many approaches to transforming the technical information concerning containment loads              W hile this technique provides an explicit treatment and performance lim its to an estim ate of failure              of uncertainty at intermediate stages of the probability, but three approaches appear to                    analysis, it still ultimately generates a point dom inate the literature. In the first (least rigorous)        estim ate for the probability of containme nt failure approach, qualitative terms expressing various                  caused by a particular mechanism.
degrees of un certainty are trans lated in to quantitative (point estimate) probabilities. For                The contributions to (and magnitude of) un certainty example, term s such as "likely" or "unlikely" are              in the final (total) containm ent fa ilure pro bab ility is assigned num erical values (such as 0.9 and 0.1).              discarded in the process.
Superlatives, such as "very" likely or "highly" unlike ly, are then used to suggest degrees of                  The third technique involves adding an additional confidence that a particular event outco m e is                feature to the technique described above. That is, app ropriate. The su bjec tivity associated with this          the probability density functions representing method is controlled to some extent by developing              unc ertainty in each term of the containment rigorous guidelines for the amount and quality of              performance log ic m od el are propagate d information necess ary to ju stify pro gressively              throughout the entire model to allow calculation of higher confidence levels (i.e., probabilities                  statistical quantities such as importance measures.
approaching 1.0 or 0.0). Nonetheless, this method              One means for accomplishing this objective is the is not considered an appropriate technique for                  application of M onte C arlo sam pling techniques assigning pro babilities to represent the state of              (such as Latin H ypercube). The applicatio n of this knowledge uncertain ties (such uncertain ties tend to          technique to Level 2 PRA logic models, pioneered dom inate a Level 2 PRA, rath er tha n un certainty            in NURE G-1150 (NRC, 1990), accomm odates a associated with random behavior.) in a PRA.                    large number of uncertain variables.
3-106
: 3. Technical Activities Probability Figu re 3.9 Pro bab ility density func tions for conta inme nt peak pressu re (P c) and failure pres sure (P f)
Other techniques have been developed for                      3.3.5 R a d i o n u c l i d e        Release specialized applications, such as the direct Characterization propagation of uncertainty technique developed to assess the probability of containment failure as a The second, albeit equally importa nt, product of a result of direct containment heating in a large dry Level 2 PRA is a quantitative characterization of PW R. However, these other techniques are radiological release to the environment resulting constrained to a small number of variables and are from each accident seq uen ce that contributes to not currently capable of applications involving the the total core da m age frequen cy.
poten tially large number of uncertain variables addressed in a Level 2 PRA.
The specific manner in which radionuclide source terms are characterized in a Level 2 analysis is 3.3.4.4 Task Interfaces described first. Attributes of coupling the evaluation of radionuclide release to analyses of T hese task s ha ve a critical interface with th e severe accident progression for particular evaluatio n of the severe accident progression sequences are also described. F inally, attributes (refe r to Task 2 of S ection 3.3.2).
of addressing uncertainties in radionuclide source terms are described.
T he output of these tasks is a range of potential containment failure modes and their corresponding 3.3.5.1 Assumptions and Limitations frequencies which provide input to radionuclide release charac terization (Section 3.3.5).
In m any Le vel 2 analyse s, the characterization of radiological rele ase is used solely as a sem i-3.3.4.5 References quantitative scale to rank the relative severity of accident sequences. In such circumstances, a NRC, Severe Accident Risks: An Assessment for rigorous quantitative evaluation of radionuclide Five U.S. Nuclear Power Plants, NUREG -1150, release, transport, and deposition may not be U.S. Nuclear Regulatory Com mission, Decem ber necessary. Rather, order-of-magnitude estimates 1990.
of the size of release for a few represe ntative radionuclide species pro vide a satisfactory scale for ranking accident severity. In a state-of-the-art Level 2 PRA, however, the characterization of radionuclide rele ase to the environment provides sufficient information to completely define the "source term" for calculating off-site health and econom ic consequences for use in a Level 3 PRA.
3-107
: 3. Technical Activities Further, the rigor required of the evaluation of                        3.3.5.2 Produ cts radionuclide release, transport, and deposition directly parallels that used to evaluate containment                    In ge ne ral, sufficien t inform ation o f the perform anc e:                                                          documentation of analyses perform ed to cha racterize rad iological source term s is provided C        Source term analyses (de term inistic                          that allows an independent analyst to reproduce computer code calculations) reflect plant-                    the res ults . At a m inim um, the following specific features of system design and                        information is documented for a PRA:
operation. In particular, the models used to calculate radionuclide source term s                        C        a sum m ary of all com pute r code fa ithf ully r e p r e s e nt p l a n t - s p e c i f ic                calculations used as the basis for characteristics such as fuel, control                                  estimating plant-specific source terms for m ate rial, and in-core sup port structure                              selected accident sequences composition and spatial distribution; configuration and deposition areas of                          C        a desc ription of modeling methods used primary coola nt system and containment                                to perform pla nt-specific source term structures; reactor cavity (or drywell floor)                          calculations including a description of the configuration and concrete composition;                                m ethod by which source term s are and topology of transport pathways from                                assigned to accident sequences for which the fuel and/or core debris to the                                      computer code (i.e., MAAP [EPRI, 1994]
environm ent.                                                          o r M E L C O R [ S u m m e r s , 1 9 9 4 ])
calculations were not performed C        Calculations of radionuclide release, transp ort, and deposition represent                          C        if ana lyses o f a su rrogate (i.e., "sim ilar")
sequence-specific variations in prima ry                                plant are used as a basis for c oola n t s yste m an d c on tain men t                                characterizing any aspect of radionuclide characteristics.      For ex am ple, reactor                            release, trans port, or dep osition in the vessel pre ss ure during in-vessel core m elt                          plant being analyzed, references to, or progression and opera tion (or failure) of                              copies of documentation of the original containment safeguard systems such as                                  analysis, and a description of the technical distributed sprays are represented in a                                basis for assuming applicability of resu lts manner that directly acc ounts for their effects on radionuclide release and/or                        C        a description of the method by which transp ort. The procedure for organizing                                uncertainties in source term s are the numerous accident sequences                                        addressed generated in a Level 1 PRA into a reasonably small number of groups that                        C        for all other original            engineering ex hib it similar radionuclide release                                  calculations, a sufficiently com plete characteristics is described below.                                    description of the analysis method, assumptions and calculated res ults is C        Uncertain ties in the processes governing                              prepared to          a c co m m o d a t e  an radionuclide release, transport, and                                    independent (peer) review deposition are q uan tified. Un certainties related to radionuclide behavior under                        3.3.5.3 Analytical Tasks severe accident conditions are quantified to characterize u ncertain ties in the                        This technical activity involves three tasks:
radionuclide source term associated with individual accident se quences. T his is                      1.      Definition of Ra dionuclide Source T erm s achieved in the same way uncertainties                        2.      Coupling Source Term and Severe for the phenom ena gove rning severe                                    Accident Progression Analyses accident progression are used to                              3.      Treatment of Source Term U ncertainties characterize u ncertain ty in the prob ability of containmen t failure (described be low).                    Each of these tasks is described in details in the following sections.
3-108
: 3. Technical Activities Task 1 - Definition of Radionuclide Source                      The combination of these two assumptions leads T erms                                                          to a radionuclide grouping scheme that reduces the total number of modeled radionuclide species T he analy s is o f h e a l th a n d e c o n omic              to nine groups, as shown in Table 3-21.
consequences resulting from an accidental release of radionuclides from a nuclear plant (in a Level 3            Although the species listed above are released PRA) requires specification of several param eters              from fuel in their elem ental form , it is firm ly (from a Level 2 PRA) that define the environmental              established that many species quickly com bine source term . Ide ally, th e fo llowing info rm atio n is      with other elements to form compounds as they developed:                                                      m igrate away from the point of release. The formation of these compounds and the associated C        the time at which a release begins                    change in the physio-chemical properties of individual radionuc lide gro ups are taken into C        the time histo ry of the release of a ll              account in the analysis of radionuclide transport radioisotopes that contribute to early                and dep osition. In particular, volatile radionuclides (deterministic) and late (stochastic) hea lth          species, such as iodine and cesium, m ay be consequences                                          transported in more than one chemical form - each with different properties that affect their transport.
C        the elevation (above local ground level) at which the release oc curs                              Chem ical forms of these radionuclide groups represented in the source term analysis of a full-C        the energy with w hich the re lease is                scope PRA include:
discharged to the environment Radionuclide          Chem ical forms for C        the size distribution of radioactive material Group                    transport released in the form of an aerosol (i.e.,
particulate)                                                    I              I2, CH 3I , HI [vapor]
CsI [a erosol]
As in many other aspects of a comprehensive PRA, it is impractical to generate this information                      Cs              CsO H, CsI [a erosol]
for the full spectrum of accident conditions produced by Level 1 and 2 analyses. To address                  A second simplification in the characterization of this constraint, several simplifications are made in            radionuclide rele ase involves the treatment of a Level 2 analysis. In particular, the following                time-dependence.        Te m poral variation s in assumptions are typically made regarding the                    radionuclide release are calculated as a natural radioactive m aterial of intere st:                            product of determ inistic source term calculations.
How ever, in a Level 2 PRA these variations are C        All isotopes of a single chemical element              reduced to a series of discrete periods of are released from fuel at the same rate.              radiological release, each of which is described by a starting time, a duration, a (constant) release C        Chem ical elements exhibiting similar                  rate, and a release en ergy. For ex am ple, res ults properties in terms of their m eas ured rate          of an integral severe acc ident/source term code of release from fuel, physical transport by            calculation might suggest the radiological release means of fluid advection, and chemical                rate shown as the solid line in Figure 3.10. The behavior in terms of interac tions w ith other        continuous release rate is simplified to represent elemental species and bounding structural              m ajor characteristics or the release history such surfaces can be effectively modeled as                as an early, short-lived, large release rate one composite radionuclide species.                    imm ediately following containment failure Typically, the specific properties of a                (sometimes referred to as the "puff release"),
single (mass dom inant) element are used              followed by two longer periods of a sustained to represent the properties of all species            release. The sp ecific c hara cteristics of these within a group.                                        discrete release periods may vary from one accident sequence (or plant damage state) to another, but the timing charac teristics (i.e., start 3-109
: 3. Technical Activities Table 3-21 Radionuclide grouping scheme used in a Level 2 PRA Group      Rep.          Elem ents                Important isotopes within the group element    represented by the group 1          Xe      Xe, Kr                Xe-133, Xe-135, Kr-85, Kr-85M, Kr-87, Kr-88 2            I    I, Br                I-131, I-132, I-133, I-134, I-135 3          Cs      Cs, Rb                Cs-134, Cs-136, Cs-137, Rb-86 4          Te      Te, Sb, Se            Te-127, Te-127M, Te-129, Te-129M, Te-131, Te-132, Sb-127, Sb-129 5            Sr    Sr                    Sr-89, Sr-90, Sr-91, Sr-92 6          Ru      Ru, Rh, Co, Mo,      Ru-103, Ru-105, Ru-106, Rh-105, Co-58, Co-60, Mo-Tc, Pd                99, Tc-99M 7          La      La, Y, Zr*, Nb,      La-140, La-141, La-142, Y-90, Y-91, Y-92, Y-93, Zr-Nd, Pr, Am , M c,    95, Zr-97, Nb-95, Nd-147, Pr-143, Am-241, Cm -242, Sm                    Cn-244 8          Ce      Ce, Np, Pu            Ce-141, Ce-143, Ce-144, Np-239, Pu-238, Pu-239, Pu-240, Pu-241 9          Ba      Ba                    Ba-139, Ba-140
    *Radionuclide Zirconium (no t the structural m eta l) 3-110
: 3. Technical Activities Figure 3.10 Example of simplified radionuclide release rates tim e and duration) are the same for each                                          containment depressurization]
radionuclide gro up (i.e., on ly the release rate varies from one group to another for a given release                        No te that the above time periods are for illustrative period). The total number of release periods is                      purposes only; others are developed, as typic ally sm all (i.e., 3 or 4) and represe nts distinct            necessary, to suit the specific results of a plan t-periods of severe accident progression.                  For        spe cific as ses sm ent.
example, the following time pe riods may be represented:                                                        Task 2 - Coupling Sou rce T erm and Sev ere Accident Progression Analyses Ve ry ea rly  [co nta in m e n t  leakage        p ri o r to containment failure]                                  The number of unique severe accident sequences represented in a Level 2 PRA c an be exceedingly Puff release[im m ed iate ly following containmen t                  large. Com prehensive, pro babilistic consideration failure]                                              of the numerous uncertainties in severe accident progression can easily expand a single accident Ea rly        [relatively large release rate period                sequence (or plant damage state) from the Level 1 accompanying            c o n t a in m e n t        systems analysis into a large num ber of alternative depressurization following breach of                  severe accident progressions. A radionuclide the conta inm ent pressure boundary]                  source term m ust be estim ated for each of these accident pro gressions. Clearly, it is impractical to Late          [long-term , low release rate after                  perform that man y deterministic source term 3-111
: 3. Technical Activities calculations.                                                  In performing this integrated uncertainty analysis, special care must be taken to ensure consistency between unc ertain para m eters as soc iated w ith A comm on practice in many Level 2 PRAs                        radionuclide release, transport, and deposition and (although insufficient for a state -of-th e-art PR A) is        other aspects of accident behavior. In particular, to reduce the analysis burden by grouping the                  the an alys is m ust account for important alternative severe a ccident progress ions into                correlations between the behavior of radionuclides "source term bins" or "release categories." This                and the other characteristics of severe accident grouping process is analogous to the one used at                progression. For example; the interface between the Level 1 and Level 2 analyses to group a ccident sequ enc e cu t sets into          C    The magnitude of radionuclide release from plant damage states. The principal objective of the                  fuel is known to be influenced by the source term grouping (or binning) exercise is to                    magnitude of Zircaloy (clad) oxidation.
reduce the number of specific severe accident                        Therefore, the distributions of p lausible values scenarios for which determ inistic source term                      for the release fraction of various radionuclides calculations must be performed to a practical                        are correlated to the distribution of values for value. A structured proces s s im ilar to the one                    the fractio n of clad oxidize d in-ve ss el.
described in Section 3.3.1 (related to the assessment of accident se quences address ed in a              C    In    the    N U R E G - 11 5 0  ( N RC ,  1 9 9 0)
Level 2 PRA) is typically followed to accomplish the                assessments, uncertainty in the retention grouping.        Charac teristics of severe accident                efficiency of aerosols transported through the behavior and con tainmen t perform ance that have                    prim ary coolant system was found to depend a controlling influence on the magnitude and timing                  strongly on primary coolant system pressure of radionuclide release to the environm ent are                      during in-vessel me lt progression. Higher used to group (or bin) the alternative accident                      retention efficienc ies were a ttributed to progressions into appropriate release categories.                    sequences involving low coolant system A determ inistic s ource term calculation is then                    pressure than those involving high pressure.
performed for a single accident progress ion with in each release c ateg ory (typically the highest                  These and other similar relationships are described frequency) to represent the entire group.                      in the experts' determination of source term issues in NUR EG /CR-45 51, Volum e 2 (Harpe r, 1990).
As indicated above, this approach is inadequate for a state-of-the-art Level 2 analysis because the                Task 3 - Trea tmen t              of  Source    Term radionuclide source term for any given severe                  Uncertainties accident prog ression can not be ca lculated with certainty. The influe nce of un certainties related to          Re sults of the Level 2 PRAs described in NUREG-the myriad processes governing radionuclide                    1150 indicate that uncertainties as soc iated w ith release from fuel, transport through the prim ary              processes governing rad ionuclide rele ase from coolant system and containment, and deposition on              fuel; transport through the primary coolant system, intervening structures is significant and must be              secondary coolant system (if applicable), and quantified with a similar level of rigor afford ed to          con tainm ent; and deposition on bounding severe ac cid ent progression uncertainties.                    structures can be a m ajor c ontributor to the Further, a state-of-the-art Level 2 PRA is                      uncertainty in some measures of risk.                For performed in a m ann er tha t allows the relative              example, uncertainties in the magnitude of contribution of in dividual param ete r un certainties to      radionuclide release from fue l during in-ve ss el m elt the overall uncertainty in risk to be calculated                progression, and uncer tainties in the amount of directly (i.e., via rank regression or some other              retention on the sh ell (sec ond ary) side of ste am sta tistic ally rigorous m anner). This requires a              generators were found to be am ong the largest probabilistic modeling process that combines the                contributors to the overall uncertainty in early unc ertainty distributions associated with the                  fatality risk associated with steam generator tube evaluation of accident frequency, severe accident              rupture events (a significant contributor to the core progression, conta inmen t performance, and                    damage frequency in som e PW Rs). Sim ilarly, radionuclide source terms in an integrated,                    uncertainties in processes such as radionuclide consistent fashion.                                            release d uring core -concrete interactions and late 3-112
: 3. Technical Activities release of io dine initially captured by pressure                have shown that the number of early fatalities can suppression pools were found to be important                      be particularly sensitive to when the release occu rs contributors to various risk m easures in BW Rs.                  relative to when the general public is being evacuated. He nce, it is also im portant that the Uncertainties in the processes specifically related              approach used to estima te the source term to radionuclide source term assessm ent are,                      properly accounts for tim ing characteristic s of the therefore, represented in a state-of-the-art Level 2              release.
PRA. W hen deterministic co des are u sed to estim ate the source term , it is important to account            Table 3-22 sum m arizes the areas in which key for all of the relevant phenomena (even when the                  uncertainties are addressed in a Level 2 analysis.
code does not explicitly include m odels for all of the          These key uncertainties are derived, in part, from phenom ena). W hen a model is not available for                  the results of the NUREG-1150 analyses, as well certain im portant phenom ena, it is not ac cepta ble            as more recent statemen ts of key source term to simple ignore the phenomena.                Instead,          uncertainties published by the NRC for light-water alternative methods are used, such as consulting                  reac tor licensing purp ose s.
different code calculations, using specialized codes, or assessing relevant experimental results.                3.3.5.4 Task Interfaces A systematic proces s an d ca lculation tools to accom m oda te sou rce term unc ertainties into th e              These tasks have a critical interface with the overall evaluation of severe accident risks we re                containment prob abilistic chara cterization (refer to developed for the Level 2 PRAs desc ribed in                      Ta sk 2 of S ection 3.3.4).
NURE G-1150.        A deta iled desc ription of this process and the associated tools is not provided                  The outpu t of these tasks is a range of potential here; the reader is referred to NUREG/CR-4551,                    containment failure m odes, release fractions (or Vol. 2, Part 4 (Harper, 1990), N UR EG -1335                      source terms), and their correspo n d ing Ap pendix A (NRC, 1989), and NUREG /CR-5360                      frequencies. The output of the Level 2 analysis (Jow, 1993), for additional information on these                  provides input to the consequence analysis topics. In addition, when estimating consequences                (Section 3.4).
in the PRA , it is also important to a ccurate ly represent the timing of the release. Past studies Table 3-22 Areas of key radionuclide source term uncertainties Magnitude of radionuclide release from fuel during core damage and material relocation in-vessel (prima rily for volatile and se m i-volatile radionuclide species).
Chem ical form of iodine for transport and deposition.
Retention efficiency during transport through the primary and secondary coolant systems (particularly for long release pa thways).
Mag nitude of radionuclide release from fuel (primarily refractory metals) and no n-radioactive aerosol generation during core-concrete interactions.
Decontamination efficiency radionuclide flow streams passing through pools of water (BW R suppres sion pools and P W R con tainmen t sum ps).
Late revaporization and release of iodine initially captured in water pools.
Capture a nd retention efficiency of aerosols in containmen t and secon dary enclosure buildings.
3-113
: 3. Technical Activities 3.3.5.5 References                                              source term. In specific cases of plant location, such as, for exam ple, a mou ntainous area or a EPRI, MAAP4 - Modular Accident Analysis                        valley, more detailed dispersion models that Program for LWR Power Plants, RP3131-02,                        incorporate terrain effects may have to be Volumes 1-4, Electric Power Research Institute,                  considered. There a re other physical param eters 1994.                                                            that influence dow nwind conc entrations.        Dry deposition velo city can vary over a wide range Sum mers, R., M, et al., "MELCOR Com puter Code                  depending on the particle size distribution of the M anuals -- Version 1.8.3," NUREG /CR-6119,                      released m aterial, the surface roughness of the SAND93-2185, Volumes 1-2, Sandia National                        terrain, and other factors. An assessment of these Laboratories, 1994.                                              uncertainties focused on the factors which influence dispersion and deposition has been NRC, Severe Accident Risks: An Assessment for                  carried out recently (Harper et al., 1995). Earlier Five U.S. Nuclear Power Plants, NUREG -1150,                    ass ess m ents of the assumptions and uncertainties U.S. Nu clear Re gulatory Com mission, Decem ber                in con seq uen ce m ode ling we re reporte d in other 1990.                                                            PRA procedu res guides (N RC , 1983).
Harpe r, F. T., et al, Evaluation of Severe Accident            Besides atmospheric transport, dispersion, and Risks: Qu antifica tion of Ma jor Inp ut Pa ram eters ,        deposition of released material, there are several NURE G/CR-4551, Volum e 2, S AND86-1309,                        other assumptions, limitations, and uncertainties Sandia National Laboratories, December 1990.                    embodied in the param eters tha t impact consequence estimation. These include: m odels NRC, Individu al Plan t Exa m ination: Sub m ittal              of the weathering and resuspension of material Gu idance, NU REG -1335, U.S. Nuclear Regulatory                deposited on the ground, modeling of the ingestion Com mission, August 1989.                                        pathw ay, i.e., the food chains, ground-crop-man and ground-crop-animal-dairy/meat-man, internal Jow, H. J., et al., "XSOR Co des Us er M anu al,"                and external dosimetry, and the h ealth e ffec ts NURE G/CR-5360, Sandia National Laboratories,                    model para m eters . Other so urces o f unc ertainty 1993.                                                            arise from the assumed values of parameters that determine the effectiveness of emergency response, such as the shielding provided by the building stock in the area where pe ople are 3.4      Level 3 Analysis                                        assumed to shelter, the speed of evacuation, etc.
(Consequence Analysis                                  Com parison of the results of different consequence and Integrated Risk                                    codes, which em bod y different approaches and values of these parameters, on a standard problem Assessment)                                            are contained in a stu dy sponsored by the Organization for Economic Co-operation and In this section, the an alyses performed as part of              Development (OEC D, 1994 ).          An u nce rtainty the Level 3 portion of a proba bilistic risk                    analysis of the COSYM A code results using the ass ess m ent (P RA ) are des cribed.                            expert elicitation method is currently being carried out (Jones, 199 6).
3.4.1 Assumptions and Limitations 3.4.2 Products In m ost Level 3 (i.e., consequence) codes, atm ospheric trans port o f the re leased m ate rial is          Docum entation of the ana lyses p erform ed to carried out assuming Gaussian plume dispersion.                  estim ate the consequences associated with the This ass um ption is gen erally valid for flat terra in to      accidental release of rad ioactivity to the a distan ce o f a few k ilom eters from the po int of            environment should contain suffic ient information release but is inaccurate both in the im m ediate                to allow an independent analyst to reproduce the vicinity of the reactor building and at farther                  results. At a minimum , the following information distances. For m ost P RA applications, howe ver,                should be documented for the Level 3 analysis:
the inaccuracies introduced by the assumption of Gaussian plumes are much sm aller than the uncertainties due to other factors, such as the 3-114
: 3. Technical Activities
* identification of the consequence code and the                to the environment include:
version used to carry out the analysis,
* a description of the site-specific data and
* land contamination assumptions used in the input to the code,
* specifications of the source term s used to run
* surface water body (e.g., lakes, rivers, etc.)
the code, and                                                      contamination.
* discussion and definition of the emergency response parameters,                                          Groundwater contamination has yet to be included
* a description of the computational process                    in a Level 3 analyses, although it may be important used to integrate the entire PRA m odel                      to consider it in certain specific cases.
(Lev el 1 - Le vel 3),
* a sum m ary of all calculated resu lts including              The econom ic im pacts are m ainly estim ate d in frequency distributions for each risk m easure.              terms of the costs of cou nterm easures take n to protect the population in the vicinity of the plant.
3.4.3 Analytical Tasks                                            Th ese cos ts ca n include:
A Level 3 PRA consists of two major tasks:
* short-term costs incurred in the evacuation and relocation of people during the emergency
: 1. Consequence analyses conditional on various                        phase following the accident and in the release mechanisms (source terms) and                              destruction of contaminated food, and
: 2. Com putation of risk by integrating the results
* long-term costs of in terdicting contaminated of Levels 1, 2, and 3 analyses.                                    farmland and residential/urban prop erty which cannot be decontam inated in a cost-effective Ta sk 1 - Con seq uence Analysis                                        m a n n e r , i .e . , w h e r e the c ost o f decontamination is greater than the value of The consequences of a n acc identa l rele ase of                        the prope rty.
radioactivity from a nuclear power plant to the surrounding enviro nm ent ca n be express ed in                  The costs of medical treatment to potential several ways: impact on human health, impact on                  accident victim s are not genera lly estimated in a the environment, and impact on the economy. The                  Level 3 analysis, although approaches do exist for consequence measures of most interest to a Level                  incorporating these costs (M ubayi, 1995) if required 3 PRA focus on the impact to human health. They                  by the application.
should include:
The results of the calculations for each
* number of early fatalities,                                  consequence m easure are usually reported as a com pleme ntary cumulative distribution function.
* number of early injuries,                                    They can also be repo rted in terms o f a distribution--for exa m ple, on es that show th e 5th
* number of latent cancer fatalities,                          percentile, the 95th percentile, the median, and the m ean .
* population dose (person-rem or person-sieve rt) out to various distances from the plant,            A probabilistic consequence assessment (PCA) code is needed to perform the Level 3 analysis.
* individual early fata lity risk defined in the early          Such codes normally take as input the fatality QHO , i.e., the risk of early fatality for the      characteristics of the release or so urce term average individual within 1 mile from the plant,              provided by the Level 2 analysis.              These and                                                          characteristics typically include for each specified source term : the release fractions of the core
* individual latent canc er fatality risk d efined in          inventory of key radionuclides, the timing and the latent cancer QHO , i.e., the risk of latent              duration of the release, the height of the rele ase cancer fatality for the average individual with in            (i.e., whether the release is elevated or ground 10 m iles of the plan t.                                      level), and the energy of the release. PCA codes incorporate algorithms for performing weather The con seq uen ce m eas ures that focus on im pac ts            sampling on the plume transport in order to obta in 3-115
: 3. Technical Activities a distribution of the concentrations and dosim etry        analyst mak e assumptions on the values of which reflec t the uncertainty and/or variability due      param eters related to the implem entation of to weath er.      The codes also m odel various            protective actions following an accident. The types protective action countermeasures to perm it a              of param ete rs involved in evaluating these actions more realistic c alculation of dos es a nd h ealth          include the following:
effects and to assess the efficacy of these different actions in reducing consequences.
* delay time between the declaration of a general emergency and the initiation of an Several PCA codes a re currently in use for                      em ergency response action, such as calculating the consequences of postulated                      evacuation or sh eltering ; this delay tim e may radiological releases. The NRC supports the use                  be site specific, of the MACCS (Jow, 1990 and Chanin, 1993) and MACCS2 (Chanin and Young, 1997) PCA codes
* fraction of the offsite population which for carrying out nuclear power plant Level 3 PRA                participates in the emergency response action, analyses. A number of countries in Europe support the use of the C OS YMA (KfK and NRPB, 1991 and
* effective evacuation speed, Jones, 1996) PCA code for their Level 3 analyses.
* degree of radiation shielding provided by the PCA codes require a substantial amount of                        building stock in the area, information on the local m ete orology, dem ography, land use, crops gro wn in various seasons, foods
* projected dose limits for long-term relocation of consumed, and prop erty values. For example, the                the population from contaminated land, and input file for the MACC S code requires the following information:
* projected ingestion dose limits used to interdict contaminated farmland.
* Meteorology - one year of hourly data on:
windspeed and direction, atm osp heric stability      The selected values assumed for the above (or class, precipitation rate , prob ab ility of          similar) parameters need to be justified and precipitation occurring at specified distances        documented since they have a sign ificant impact from the plant site, and height of the                on the consequence calculations.
atm osphe ric inversion layer.
In summ ary, the PCA code selected for the
* Dem ography - population distribution around          calculation of c onsequences should have the the plant on a polar grid defined by 16 angular        following capabilities:
sectors and user-specified annular radial sectors, usually a finer grid close to the plant
* incorporate impact of weather variability on and one that becomes progressively coarser at              plume transport by performing stratified or greater distances.                                          Mo nte Carlo sampling on an annual set of relevant site meteorological data,
* Land Use - fraction which is land, land which is agricultu ral, major crops, and growing season.
* allow for plume depletion due to dry and wet deposition mechanisms,
* Ec onom ic Data - value of farmland, value of nonfarm property, and annual farm sales.
* allow for buoyancy rise of energetic releases, The MACC S User Manual (Chanin, 1990) and the
* include all possible dose pathways, external MACCS2 Us er Guide (C hanin and Young, 1997)                    and internal (such as cloudshine, groundshine, may be consulted for a complete description of the              inhalation, resuspension inhalation, and site input data necess ary.                                      ingestion) in the estimation of doses, In add ition to site d ata, a PCA code should have
* employ validated health effects m odels based, provisions to m odel countermeasures to protect the              for example, on (ICRP, 1991) or BEIR V public and provide a more realistic estimate of the              (National Research Council, 1990) dose doses and hea lth effects following an accidental                factors for converting rad iation doses to early release. The MACC S code requires that the                      and latent health effects, and 3-116
: 3. Technical Activities
* allow for the m ode ling of c oun term eas ures to      Task 2 - Com putation of Risk perm it estimation of a more realistic impact of acc idental releases .                                  The final step in a Level 3 PRA is the integration of resu lts from all previous analyses to compute The ab ov e- cite d m eth od s f or es tim atin g            individual measures of risk. The severe accident consequences are, in general, adequate for                    progressio n and the radionuclide source term acc idents caused by internal initiating events during        analyses conducted in the Level 2 portion of the both full power operation and shutdown conditions.            PRA, as well as the consequence analysis How ever, for external initiating events, such as            conducted in the Level 3 portion of the PRA , are seism ic events, certain changes may be needed.              performed on a conditional basis. That is, the For example, the early warning systems and the                evaluations of alternative severe accident road network m ay be disrupted so that initiation            progressions, resulting source terms, and and execution of emergency response actions may              consequences are performed without regard to the not be possible. Hence, in addition to changing the          abs olute or relative frequency of the postulated potential source terms, a seismic event could also            accidents. The final computation of risk is the influence the ability of the close-in populatio n to          process by which each of these portions of the carry out an early evacuation . A Level 3 seism ic            accident analysis are linked together in a self-PRA should, therefore, include consideration of the          consistent and statistically rigorous m anner.
impac ts of diffe rent lev els of earth qua ke severity on the co nse que nce ass ess m ent.                          An important attribute b y which the rigor of the process is likely to be judged is th e ab ility to To use a consequence code, generally the                      dem onstrate traceability from a specific accident following da ta elem ents are re quired:                      sequence through the relative likelihood of alternative severe accident progressions and
* reac tor rad ionuclide invento ry,                      measures of associated containment performance (i.e., early versus late failure) and ultimately to the
* accident source terms defined by the release            distribution of fission product source terms and fractions of important radionuclide groups, the          consequences.        This traceability should be timing and duration of the release, and the              dem onstrable in both directions, i.e., from the ene rgy and he ight of the release,                      ac cident sequence to a di stributio n of consequences and from a specific level of accident
* hourly m eteorological data at the site as              consequences back to the fission product source recomm ended, for example, in Regulatory                terms, containment performance m easures, or Guide 1.23 (NR C, 1986), collected over one o r,        accident sequences th at c ontribute to that preferably, more years and processed into a              consequence level.
form usa ble by the cho sen cod e, 3.4.4 Task Interfaces
* site population data from census or other reliable sources and processed in con form ity          The current task requires a set of release fractions with the requirements of the c ode , i.e., to            (or source terms) from the Level 2 analysis provide population information for each area            (Section 3.3) as input to the consequence analysis.
elem ent on the grid us ed in th e co de,
* site economic and land use data, specifying              The consequences are calculated in terms of:
the important crops in the area , value and              (1) the acute and chronic ra diation doses from all exte nt of fa rm and non farm prop erty,                pathw ays to the affected population around the plant, (2) the consequent health effects (such as
* d e f in i n g the    e m er ge nc y  response          early fatalities, e arly injuries, and latent cancer countermea sures, including the possible tim e          fatalities), (3) the integrated population do se to delay in initiating response after declaration of        som e specified distance (such as 50 miles) from warning and the likely participation in the              the point of release, and (4) the contamination of respon se b y the offsite po pulation.                  land from the depo sited m aterial.
The consequence measures to be calculated depends on the applicatio n as defined in PRA 3-117
: 3. Technical Activities Scope.      Generally, in a Level 3 analysis, a            Jones, J. A., et al., "Uncertainty Analysis on distribution of consequences is obtained by                CO SYM A," Proceedings of the Com bined 3rd statistical sampling of the weather conditions at the      COSYMA Users Group and 2nd International site. Each set of consequences, howe ver, is                MACCS Users Group Meeting, Portoroz, Slovenia, conditional on the characteristics of the release (or      41228-NUC 96-9238, KEMA, Arnhem, the source term) w hich are evaluate d in the Level 2          Netherlands, September 16-19, 1996.
analysis.
Jow, H. N., et al., "MELCOR Accident An integrated risk assessm ent combines the                Consequence Code System (MA CCS), Volume II, results of the Levels 1, 2, an d 3 analyse s to            Model De sc ription ," NUREG /CR-4691, S andia com pute the selected measu res of risk in a self-          National Laboratories, February 1990.
consistent and statistically rigorous manner. The risk measures usually selected are: early fatalities,      KfK and NR PB, "CO SYM A - A Ne w Program latent cancer fatalities, population dose, and              Package for Accident C ons equ enc e As ses sm ent,"
quantitative health objectives (QHOs) of the U.S.          C E C          B r u s s e ls ,      E U R  1 3 0 2 8, Nuclear Re gulato ry Com m ission (NR C) S afety            Kernforschungszentrum (Karlsruhe) and National Goals (NRC, 1986).          Again, the actual risk          Radiological Protection Board, 1991.
m easures calculated will depend on the PRA Scope.                                                      Mubayi, V., et al., "C ost-Benefit Consideratio ns in R e g u l a t o r y A n a l ys i s ," NU RE G/C R - 6 3 9 5 ,
3.4.5 References                                            Brookhaven National Laboratory, 1995.
Chanin, D.I., and M. L. Young, "Code Manual for            National Research Council, "Health Effects of MACC S2: Volume 1, User's Guide," SAND97-                  Expos ure to Low Levels of Ion izing Radiation,"
0594, Sandia National Laboratories, March 1997.            BEIR V, W ashington, DC, 1990.
Chanin, D.I., et al., "M AC CS Version 1.5.11.1: A          NRC, "Severe Accident Risks: An Assessm ent for Maintenance Release of the Code," NUREG/CR-                Five U.S. Nuclear Power Plants," NUREG -1150, 6059, Sandia National Laboratories, October 1993.          Vo l. 1, Main Rep ort, U.S. Nuclear Reg ulatory Com mission, 1990.
Chanin, D.I., et a l., "MELCOR Accident Consequence Code System (MAC CS), Volume 1,                NRC, "Safety Goals for the Operation of Nuclear Us er's Guide," NUREG /CR-4691, Sandia National            Power Plants, Po licy Statem ent, Federal Register, Laboratories, February 1990.                                Vo l. 51, N o. 149, U.S. Nuclear R egulatory Com mission, August 4, 1986.
Harpe r, F. T., et al., "Probabilistic Accident Consequence Un certainty A nalysis, Dispersion,            N R C , Onsi te Meteorological P rogra m s, and De po sitio n U nc er tain ty As ses sm ent, "          Regu latory Guide 1.23, U.S. Nu clear Regu latory NURE G/CR-6244, Sandia National Laboratories,              Com mission, April 1986.
1995.
NRC, PRA Procedures Guide - A Guide to the ICRP, 1990 Recomm endations of the ICRP,                  Performance of P robabilistic Risk Ass ess m ents for Annals of the ICRP, Vol. 21, No. 1-3, ICRP                  Nuclear Power Plants, NURE G/CR-2300, Vol. 2, Publication 60, International Com mission on                U.S. Nuclear Regulatory Comm ission, 1983.
Radiological Protection, Pergamon Press, Oxford, England, 1991.                                              OECD, "Probabilistic Accident Consequence A ssessment Codes, Second I nterna tional C ompa rison ", Organi sati on for E co nom ic Cooperation and Development, Nuclear Energy Agency, Paris, France, 1994.
3-118
: 3. Technical Activities 3.5        Flood Analysis
* Care sho uld be take n to include in the analysis those scenarios initiated by a non-flood incident (such as a pipe break) that might The analytical tasks associated with a Level 1 involve the introduction of wate r or ste am into probabilistic risk a sse ssm ent (P RA ) for accidents areas that include equipment of interest in the initiated by events internal to the plant (such as PRA. Th is requires the analyst to w ork c losely trans ients and loss-of-coo lant accidents) are with those who are developing the event described in previous chapters. Other events both sequence models to assure that all such internal and external to the plant can cause unique events are accounted for in the m odel.
initiating events or influence the way in which a Norm ally, the impact of flood water, spray, or plant responds to an accident. Cha pter 1 identifies steam resulting directly from a pipe break is three types of events (i.e., internal fires, internal already considered in the event sequence floods, and seism ic e vents ) that req uire model if the failure results in a reactor or manipulation of the Level 1 internal event PR A in turbine trip.
order to adequately model the plant response.
* Analyses for other internal hazards (other than In this section, the way in which a Level 1 PRA is fire or flood) identified in the task Spatial m od ified in order to model accidents initiated by Interactions should be carried out as part of internal floods is described.
this task using the guidelines presented here.
Such hazards could include the dropping of 3.5.1 Assumptions and Limitations                                  heavy objects or the spillage or leakage of caustic m ate rial.
W hen preparing this section, some assumptions and limitations were made as indicated below:
3.5.2 Products
* It is assumed that flood and spray incidence During the conduct of this task, the scenario tables data from VVERs are available. The flood and initiated in the Spatial Interactions Task are spray incidence data should be of sufficient expanded upon and refined (an example of such a resolution to allow characterization according tab le is provided in Appendix C). The completed to the source of the flood or spray (e.g., piping and refined scenario tables mak e up a key product failure, tank failure, etc.) and any other for this effort.
characteristics of the pos tulated event (e.g.,
maintenance error, pass ive failu re, dynam ic A description of the m etho dology and the data failure, etc.).
analyses utilized to perform the floo d analysis will be developed.
* It is assumed that a reasonable and practical quantitative screening criterion for culling out risk-insignificant events can be developed that        3.5.3 Analytical Task would facilitate the completion of this task.
W hile the internal flooding analysis of a PRA uses
* The guidelines presented closely parallel those        much the same processes and has the same given in the procedure guide for the ta sk F ire        attributes of a traditional full power interna l events An alysis because of the sim ilarity in the basic      PRA, the internal flooding analysis requires a activities involved. However, since different          significant amount of work to define and screen the ana lysts typically undertake the consideration        most important floo d sources and possible of fire and flood analyses, individual procedu re      scenarios for further evaluation. These differences guides have been developed for each activity.          are described below in gene ral terms. Mo re Also, detailed phenomenological analyses are            detailed guidance can be found in NRC (1997) and typic ally of secondary importance in conducting        Bohn (1 990 ).
investigations of the impact of internal hazards in support of a PRA. Such investigations have          The specific goals of this task include the the characteristic approach that can be                development of a flood frequency database, the described as an "iterative conservative                determination of the frequency of specific flood screening" of scenarios.                                scenarios, the further development and refinement of flood scenarios, the determ ination of the flood damage to equipment and of the plant response, 3-119
: 3. Technical Activities and the quantification of the flood-induced                    occurrence frequencies ass essed during this scenarios including the assignment to specific plant            activity of the pro cess satisfy the following damage states. The hazard occurrence frequency                  objectives:
and a set of "worst-case" plant imp acts are assessed for each scenario developed in the
* The hazard scenario frequency must spa tial interac tions a nalysis.                                      consiste ntly acc oun t for industry flood and spray data and any plant-specific experience Each scenario is then screene d qu antitatively to                    tha t had occ urred in the type of location being determine its risk significance in relation to other                  modeled.
initiating events. Scenarios that are quantita tively insignificant are documented and removed from
* The hazard scenario frequency must provide a further consideration.        If a scenario remains                    conse rvative upper bound in case m ore quantitatively significant compared with the                          detailed event scenarios need to be developed screening criteria, it is reta ined for further                        for the location. In these cases, the total evaluation. Additional analyses are then performed                    sc enario frequency may be consiste ntly to systematically refine the hazard initiating event                  subdivided to more realistically represent any frequency and its functional impacts and to develop                    specific event scenario in the location. Having a m ore realistic a sse ssm ent of its risk significance.              a conservative upper-bound frequency for the During this process, the original flood or spray                      gross scenario implies that the frequency of sc enario is often subdivided into more detailed                      these more subtle, refined scenarios are scenarios to m ore s pec ifically accoun t for actual                  captured, even after screening.
impac ts that can occur within the hazard location.
Screening is, therefore, performed at various                  These objectives are somewhat counteractive.
stages of the scenario-refinem ent process until                The first goal is to develop an event frequency that final quantification of the PRA event sequence                  is as realistic as possible for a plant-specific risk mode ls. The goals are accomplished by the                      ass ess m ent. The second goal is to develop an performance of five tasks:                                      event fre quency th at is suffic iently con servative to ensure that the hazard scenario is not
: 1. Assessm ent of the Flood an d Spra y                      inappropriate ly screened from the PRA models.
Occurrence Frequencies,                                  Thus, in effect, the analysis must develop an initial
: 2. Asses sm ent of W orst-cas e Plant Im pac t,              f r e q u e n c y e s t im a t e that i s "r e a s o n a b ly
: 3. P er f orm a n c e  of    Q uan titative Scena rio        conservative" for each defined scenario.
Screening,
: 4. Refinement of Scenario Frequency and Impact              This first activity involves a thorough review of the Analysis,                                                industry exp erience d ata to develop a "specialized
: 5. Retention of Risk Significant Scenarios.                  generic database." This database should account for design features of the plant, the scope of the Each of these activities is discussed below which              PRA models, and the characteristics of the specific mak es use of the information found in Bohn                    hazard. Each event in the industry-experience (1990).                                                        database should be reviewe d to determ ine its app licability and to catego rize the e vent with Task 1 - Assessment of Flood and Spray                          respect to the types of hazard s cenarios defined.
Occurrence Frequencies                                          As for flood incidence data, if data from plants other than VVE Rs are u sed, care must be taken to T he objective of the scenario frequency                        inte rpret the data properly.
assessm ent is to consistently quantify a pla nt-specific hazard occurrence rate for each                The resulting database should contain summ aries location identified in the task Spatial Interactions as        of only those events that are relevant for the plant being vulnerable to the impacts of internal floods or          being mod eled, for the specific operating spray.                                                          conditions being evaluate d, and for the specific scope of the functional impact locations and hazard Since a quantitative screening process is to be                sc enarios defined in the analysis. This database performed during the detailed scenario analysis                should be docu m ente d an d sh ould provide the phase of the internal plant hazards analysis, it is,            generic industry experience input to the hazard therefore, very im porta nt that the hazard                    frequency analysis.
3-120
: 3. Technical Activities A two-stage Bayesian analysis combines the                      spray), regardless of the size of the location, the industry data with actual experience from the plant.            number of affected components, and the observed The first stage of the Bayesian analysis develops a              distribution of hazard severities. The assumed generic frequency distribution for each hazard that              failure m ode fo r flood or s pray events is usually consiste ntly accounts for the obs erve d site-to-site          loss of function of the susceptible equipment. For variab ility in the industry experience data. The                most locations, this assessmen t provides second stage upd ates this ge neric frequen cy to                numerical risk contributions that may be several account specifically for the actual historical                  times highe r than those that would be evaluated experience at Kalinin.                                          through a more detailed analysis. This is because the occurrenc e frequenc y for most hazards is Estimates are made of the fraction of each hazard                dom inated by relatively insignificant eve nts, e.g.,
and hazard type for each location.              These          relatively small leakage events. However, the estimates are necessary in order to partition the                impac ts are postu late d to be the res ult of an hazard occurrence fre qu en cie s to specific                    extrem ely large flood or spray event, which is a loca tions. In m ost c ase s, it is nec ess ary to              highly unlike ly, low frequen cy eve nt. This approach combine data for various types o f haza rds to                  ensures that a conserva tive upper bo und is develop the best p ossible frequency estimate for a              evaluated for the risk contribution from any hazard particular loc ation.                                            event that may dama ge m ultiple com ponents with in the location. That is, an event frequency of m ore This pro cess is consiste nt w ith th e evaluation of a ll      frequen t, insignificant events is linked to postulated other data in the PRA, including the frequencies for            impac ts that may be attributable to a less frequen t, internal initiating events, component failure rates,            more catastrophic scenario.
component maintenance unavailabilities, and equipment comm on-cause failures.                                The impact assessments do not account for the relative timing of possible failures or for design Task 2 - Asses sm ent of W orst-Case Plant                      features that may prevent certain combinations of Impact fo r Each Sce nario                                      failures. For exam ple, the PR A s uccess criteria may require tha t a pum p m ust be tripped to avoid In the task Spatial Interactions, PRA-related                    poss ible damage after loss of oil cooling. A equipment that may be damaged by each hazard                    possible flood scenario may affect a control panel in a particular functional impact location was                  for the cooling wate r sup ply pum p. The worst-case identified. In this activity, analysts who are very              im pacts from this sc ena rio are bou nde d by the familiar with the PRA event sequence models and                  following combination of conditions:
system fault tree s de velop a conse rvatively bounding set of im pac ts for each hazard scenario.
* It is assum ed that the cooling wate r supply is These impacts determine the specific equipment                        disabled by the flood event. This condition failure m odes assigned when the haza rd scenario                    requires that the pump m ust trip.
is evaluated in the PRA risk m odels.
* It is assumed that the pump trip circuits are The initial assessm ent of these im pacts are                        disabled by the flood or spray event if these considered to be the worst-case combination of                        circuits are locate d in the sam e susceptib le failures that could reasonably be caused by the                      cab inet.
hazard. It is important to ensure that the assigned impac ts provide a conservative upper bound for all
* It is assumed that power remains available for actual failures that may occur during any flood or                    the pump m otor until the pump is damaged spray scenario in the location. If it is determined                  bec aus e of lack of co oling.
that the scenario is qua ntitatively insign ificant w ith these bounding im pacts, then there is assurance                The impact assessments do not account for that a m ore realistic evaluation would confirm that            poss ible operator actions to override or bypass the attendant risk would also be muc h lower than                faulty control circuits or to operate equipment the screening value.                                            locally. No recovery actions are modeled for any damage caused directly by the hazard event.
At this point in the analysis, it is conservatively              Other operator actions are modeled only within the assumed that all equipm ent in the location is                  context of the entire sequence of events initiated by damaged by the hazard (either by submergence or                  the hazard scenario, co nsiste ntly w ith dynam ic 3-121
: 3. Technical Activities actions evaluated for similar internal initiating              by the com bined effects from failures induced by events.                                                        the internal flood scenario, independent equipment successes and failures, and appropriate operator Ac cordingly, the most conservative combination of            actions. All sequences that lead to core damage impac ts that could possibly occur, withou t rega rd to        are recorded, and the total core damage frequency the relative timing of failures or the actual likelihood      is compared with a numerical screening criterion to for any of the spec ific impac ts, are used in this            determine the relative risk significance of the ass ess m ent.                                                scenario.
As this activity proceeds, the affected PRA
* If the total core damage frequency from all equipment and the functional impacts from each                      sequences initiated by the scenario falls below hazard scenario are listed in data entry 7 of each                  the screening criterion, it is concluded that the sc enario table. In most cases, explanatory notes                  hazard produces an insignificant contribution to are provided also in data entry 9 to m ore                          overall plant risk. The screening evaluation is com pletely document the bases for the assigned                    documented, and the scenario is removed impacts.                                                            from furthe r consideratio n in the PRA m odels.
If a particular hazard scen ario requires m ore
* If the total core dam age frequency from the detailed analysis, this activity is the starting point              sc enario is higher than the screening criterion, since the refinement process may involve several                    the scenario is retained for further analysis in iterations. Each iteration typically includes a critical            the PRA.
reexam ination of on ly the m ost im porta nt im pac ts to p l a n t e q u i p m e n t fo r th at s ce na rio .
* If the poten tial plant da m age              state Conserva tively bounding assumptions are retained                  consequences from the scenario are unusual for impac ts that have a relatively insignificant effect            or severe, the scenario is retained for further on overall risk. The g oals of this p rocess are to                analysis, even if its total core damage succ essively relax the most significant worst-case                frequency is below the screening criterion.
assumptions for each scenario, w hile retaining an overall conservative approach throughout the                  Although the m ech anics of th is proces s are quite screening process.                                            straightforward, several considerations mu st be noted to develop the proper perspective and Task 3 - Perform ance o f Quantita tive Sce nario              context for this critical activity in the analysis.
Screening The m ethods used to assess the hazard initiating Each flood or spray scenario is characterized by a            event frequency and the s cenario imp acts ensu re hazard occurrence frequency and a set of                      that the evaluated core damage frequency is a functional impacts that affect the availability of            conservative upper bou nd for the actual core various PRA com ponents and syste m s. In this                damage frequency that may occur from any activity of the analysis, each scenario is propagated          particular scenario in the location. The amount of through the PRA risk m odels to determine a                    conservatism depend s on a variety of factors, quantitative upper bound for its tota l contribution to        which cannot be estimated directly without plant risk.      In the Kalinin PRA, it may be                considerable examination of the underlying m odels app ropriate to add house events to th e syste m fau lt        and analyses. However, the applied methods trees to re present the im pact o f specific                  provide assuran ce that the conditional core environm enta l hazard-induce d failure s.                    damage resulting from this scenario will not occur at a higher frequency.
No te that since the same plant event sequence logic m odels are used to qua ntify the impact of the          This screening approach is not unique to the postulated environmental hazards as were used for              evaluation of internal plant hazards . Implicit and the internal event initiators, the plant d am age state        explicit screening criteria are applied at all levels of assignments are consistent with those already                  a practical risk assessm ent. The issue of basic developed for the internal events m odel.                      event truncation in previous tasks can be construed as so m e form of sc reen ing. It is worth In general, each scenario results in a large number            noting that the screening criterion used in this task of individual detailed event sequences determined              effectively defines an absolute lower limit for the 3-122
: 3. Technical Activities resolution of concerns about the risk significance from internal plant hazards. Scenarios that fall                Task 4 - Refine me nt of Scenario Frequency below the limit are, by definition, considered to be            and Im pact Analysis insignificant, and the relative importance of each scenario that remains above the limit is evaluated              Each hazard scenario having a total core damage consiste ntly with all other events m od ele d in the          frequency that exceeds th e screening criterion is PRA.                                                            retained fo r further an alysis in the PR A m ode ls.
Selection of the num erical screening criterion is not          If furthe r an alysis is warranted, an iterative process a simple task. There are no general guidelines or              is performed to refine the models. This process "accepted" numerical values th at c an be bro adly              involves careful reexamination of all assumptions applied for any particular analysis. The selected              and succ essive application of the pre vious analysis value should be:                                                activities to syste m atic ally develop m ore re alistic m odels for the scenario definition, the hazard
* low enough to ensure that the screened                    frequency, and the assigned impacts. One or m ore scenarios are truly insignificant to the total risk,      of the following refinements are typically made during this phase of the analysis:
* high enough to facilitate a practical analysis and to limit efforts to develop detailed m odels
* The scenario may be subdivided into a set of for unimportant events, and                                      several constituent scenarios that are based on physical characteristics of the location and
* relatively insensitive to any future refine m ents              the hazard sources. This process allows the in the PRA event sequence models, system                        assignment of m ore re alistic equipm ent analyses, and data.                                              impac ts from each of the specific hazard conditions.
Based on the above, the screening pro cess should begin when the results from the internal initiating
* The hazard may be subdivided into various events phase h ave reached a p oint of relative                      severity levels that are based on observed m aturity and stability, i.e., a point at which the                  experience from the generic and plant-specific internal events re sults are n ot expec ted to change                databases. Each hazard severity level is "significantly."  Screening values are typically                    examined to define a more realistic set of selected to ensure that the total core damage                        impac ts that could be caus ed b y an event w ith frequency from each screened scenario is less                        tha t se verity.
than approximately 0.05 percent to 0.1 percent (i.e., 1/20 to 1/10 of 1 percent) of the total core
* The assum ed im pacts from control circuit damage frequency from all other contributors.                        malfunctions may be reexamined to determine Thus, for ex am ple, if the s creening criterion is                  whether the assumed failure modes can num erically equal to 0.1 percent of the total core                  actua lly occur in combination. Models may damage frequency from all other causes, an                            also be developed to probabilistica lly account abs olute minimum of 1,000 screened hazard                            for the relative timing of these failures.
scenarios would be needed to double the total core dam age frequency. If the screening analysis is
* The event sequences that are initiated by the performed at an earlier stage of the PRA modeling                    hazard m ay be refined to include possible process, it is generally recomm ended that the                        operator reco very ac tions th at m ay be p ut into screening values be set at even a smaller                            place to m itigate the haza rd or its impac ts percentage of the pre lim inary core damage                          before specific event seque nce s pro gres s to frequency. This avoids the need for inefficient                      core damage.
rescreening of the internal hazard scenarios after modeling refinements reduce the contributions                  The refinem ents a pplied for a particu lar scenario from all other initiators.                                      depend on specific characteristics of the hazard, the location, and the fun ctio nal impacts from the The final screening value thus cannot be                        original analysis. The results from the screening determined at th is time. For persp ective, however,            evaluations often provide valuable insights about the screening value used in one recent study was                the most important assump tio ns and 1 x 10 -9 core dam age even t per year.                        conservatisms that mus t be reexamined. The 3-123
: 3. Technical Activities refinement process for a particular scenario may
* In other cases, a scenario may be retained involve several iteratio ns. Ea ch iteratio n typically            only after considerable additional analyses includes a critical reexamination of only the most                  have been perform ed to refine conservative important impac ts for that scenario. Conservatively                assumptions about its frequency and impacts, bounding assumptions are retained for all im pac ts                either by refining the scenarios or by using that remain relatively insignificant to overall risk.              phenomenological modeling.
The goa ls of this process are to syste m atic ally relax the most significant worst-case assumptions              Because of these differences, it is not poss ible to for each scenario, while retaining an overall                  develop meaningful estimates for the amount of conse rvative approach throughout success ive                  conservatism that may remain in any particular screening evaluations.                                        scenario. However, the scenarios that have been reanalyzed should contain lesser conservatism W henever a hazard sc ena rio is subdivide d, a                than scenarios retained from an earlier stage of the sep arate sum m ary table is developed to document            analysis.
each refined scenario. These tables have the sam e format as the original scenario tables. They            It is not possible to develop an y m eaningful list the frequency for each refined hazard event and          numerical estimates for the "actual" core damage the specific impacts assigned to that event. The              frequency ass ociated w ith the screened scenarios.
tables also document all deterministic and                    The analysis process is structured to ensure that probabilistic analyses perform ed to develop the              this frequency is very small compared with other sc enario frequency and its impacts. Each refined              contributors to plant risk, but the value is certain ly sc enario is reevaluated in the PRA event trees and            not zero. In support of the analysis conclusions, it fault trees, and the re sults are ree xam ined in              is only possible to examine a conservative relation to the quantitative screening criteria.              upper-bound numerical value that may be derived from the successive screening evaluation s. T his Scenario refinem ent ca n continu e fu rther if                value is certain ly neithe r a b est nor realistic warranted. Analyses that consider leakage rates,              estim ate of the core damage frequency from these drainage rates, component vulnerabilities, and                scenarios. However, the "true" core damage potential m itigative actions, for example, can be            frequency m ust be considerably lower than this used to support the rem oval of conservatism s in              composite screening value.
selected scenarios. It is expected that such analyses will be required only for a limited number            The approach outlined in this pro cedure guide is of flood or spray scenarios.                                  structured to produce a systematic, top-down, iterative estimate of the risk due to postulated Task 5 -        Retention      of  Risk-Significant          internal flood or spra y even ts. A parallel and very Scenarios                                                      similar approach is adopted to determine the risk associated with fires. Both analyses rely on the A com bination of technical and practical                      results of a structured spatial interactions analysis.
considerations determine the final set of scenarios retained for qu antifica tion in the PR A results. All        Sp ecific scenarios that involve flooding or spraying scenarios that exceed the quantitative screening              of hot water or steam can degrade the ambient criteria are retained in the PRA m odels. Howe ver,            environm ent. Ho we ver, not m uch inform atio n is the degree of refinem ent m ay vary considerably              available concerning the operatio n of eq uipm ent in among these scenarios:                                        high tem pera ture o r hum id environm ents . In that case, it is usua lly assum ed that the equipment
* In some cases, the worst-case core damage                would fail (fail to continue to run or fail to start for frequency estim ate for an initial hazard                motors; fail to transfer for valves) if the sc enario m ay be numerically higher than the            environmental qualification envelope for the screening value, but the scenario remains a              particular piece of equipmen t is exceeded.
very small contribution to overall plant risk.          Consideration of the environmental impact on Extensive effort to furthe r refine these                control circ uitry (es pecially solid-state equipm ent) scenarios is not justified by practical                  is m ore complex. Control failures and/or spurious considerations, and they are sim ply re tain ed in      signals can be postula ted . The analysis should the PR A results with their co nservatively bounding frequencies and impacts.
3-124
: 3. Technical Activities clearly specify what failure modes are m odeled and              con tribute appreciably to the frequenc y of core should outline the rationale for choosing these                  damage (or to specific undesirable plant damage failure modes.                                                    states) are retained for further analysis and/or refine m ent.
The development of flood scenarios should include the consideration of propag ation of the floo d via              Refinement m ay involve suc h co nsiderations a s the doorways, drains, and ventilation duc twork. These                extent of the damage in itially postulated. The pathw ays should have been considered in the                      process proceeds until the scenarios that rem ain information developed as part of the task Spatial                appropriately represent the risk asso ciated with Interactions. In addition, if the failure of barriers or          internal floods while containing acceptable structures due to static loading is credible and                  conservatisms.
could lead to a more severe flood impact, failure of such barriers should also be considered.                          3.5.4 Task Interfaces Typically, no credit is taken for drains as a means              The current task utilizes the same overall analysis of mitigating a flood unless it is found in                      approach and procedures developed for the subsequent iterations that the drains may be an                  internal event PRA. In particular, this task build s important facto r in the d efinition o f the s cen ario. In      on the information developed in the task on Spatial that case, their performance should be                            Interactions. The c onduc t of this task will require investigated, at least probabilistically. In some                input from the tasks on Initiating Event Analysis, plants, the flow characteristic of individual drains              Frequency of Initiating Events, Event Sequence has not been demonstrated since start-up, in which                Modeling, and System Modeling. As scenarios are case assurances must be given that construction                  being developed to address floods, it is likely that material or other debris has not significantly altered            specific operator actions will be identified, thus the capabilities of the specific drains under                    requiring an interface with the task Human consideration.                                                    Re liability Analysis.
Flood frequencies are derived for a generic nuclear              Output from the Flood Analysis task provides power plant based on potential flood sources. For                information on accident sequence definition and on example, a flood frequency may be determined for                  frequency of o cc urrence directly to the Level 2 "heat exchan gers" (due, for exam ple, to errors                  task, which in turn provides source term during m aintenance eve nts) at a nuclear power                  information to the consequ ence an d risk integration plant similar to the one under consideration using                task. W hether or not Level 2/3 analyses are industry data. Although "generic" in nature, the                  performed depends on the scope of the PRA.
data is spe cialized a nd s creene d to match closely the characteristics of the specific plant under 3.5.5 References consideration.        The ge neric flood hazard frequencies are to be updated with the actual Bohn, M. P., and J. A. Lambright, "Procedures for experiences at Kalinin.
the External Event Core Damage Frequency for NU RE G-115 0," NUREG /CR-4840, Sandia National The location of the specific hazards has been Laboratories, November 1990.
determined in the task Spa tial Interactions.
Estimates are req uired in this task for the fractions NRC, The Use of PRA in Risk-Informed of each flooding source (e.g., tanks or piping)
Applications, NURE G-1602, Draft Report for found in each location.
Com ment, June 1997.
For a specific location, the frequency of occurrence of a flood or spray of any size is determined by                  3.6      Fire Analysis summ ing the fractional contribution of occurrence from each floo d or spray haza rd fou nd in that                  The analytical tasks as sociated with a Level 1 location.                                                        probabilistic risk a sse ssm ent (P RA ) for accidents initiated by events internal to the plant (such as A quantitative screen ing value is developed to                  transients and loss-of-coo lant accidents) are identify those scen arios that will be carried forward            described in previous sections. Other events both in the analysis.      Only those scenarios that                  internal and external to the plant can cause unique 3-125
: 3. Technical Activities initiatin g events or influence the way in which a                  COMPBRN (Ho et al., 1991) are typically of plant responds to an accident. In this section, the                secon dary importance for assessing the overall way in which a Level 1 PRA is modified in orde r to                impact of fire hazards. Through c onservative model accidents initiate d by internal fires is                    screening, there might be a few scenarios des cribed.                                                        which m ay warrant the use of these types of detailed analyses in support of a typical fire 3.6.1 Assumptions and Limitations                                  PRA. It is assumed that a reasonable and prac tical quantitative screening criterion can be developed that would facilitate the completion W hen preparing this section, some assumptions of this tas k w ith m inim al use of c om plex fire and limitations were made as indicated below:
modeling codes.
: 1. It is as su m ed tha t fire incidence data from
: 5. It should also be noted that these guidelines VVERs are available. The fire data should be closely parallel those needed to perform the of sufficient resolution to allow categorization task Flood Analysis. Although these guidelines according to fire source (e.g., cable, might seem to duplicate those found in the switchgear, logic cabinet, etc.). If data are not task Flood Analysis, individual procedu re available, or are incomplete, expert knowledge guides have been developed since different can be utilized.
ana lysts are presumed to perform these tasks separately.
: 2. The ap proa ch ou tlined for treating the possibility of damage to electric cab les du e to fire assumes that cable function and routing            3.6.2 Products information are known. If this is not the case, alternative app roac hes are a vailable to              During the perform anc e of this task , the sc enario address this type of damage.              These        tables that were initiated in the Spatial Interactions alternative approac hes will tend to be m ore          Task are expanded upon and re fined (an exam ple conservative and overstate the contribution to          of such a table is provided in Appendix D). The core damage due to fire. One such alternative          completed and refined scenario tables mak e up a wo uld be to assume that if a fire damages a            key product fo r this effort.
cable of a given division, then all equipm ent in that division is assumed to be unavailable.            A description of the methodology and the analyses Refinements to that alternative approach are,          utilized to perform the fire analysis will be of course, possible if limited cable routing and        developed.
function information are known.
3.6.3 Analytical Tasks
: 3. A simple and straightforward treatment of "hot shorts" and open circuits in control circuits is        A full power internal fire PRA utilizes the same outlined herein. This approach, which does not          overall analysis approach and procedures used in treat the time dependence of circuit damage            performing a full power traditional internal events modes in a sophisticated m anner, is assumed            PRA.        In fact, there are many points of to adequately and conserva tively represent the        com m ona lity between the traditiona l internal events functional impact from these damage                    analysis and an internal fire risk analysis. These phenomena. A m ore a dvance d ap proa ch to            include the use of the sam e fundamental plant circuit analysis is provided in LaChance                systems models (event trees and fault trees),
(2003).                                                similar treatmen t for random failures and equipment unavailability factors, s im ilar m ethods of
: 4. This investigation has a cha rac teristic              overall risk and uncertainty quantification, and approach that can be described as an iterative        similar methods for the plant recovery and human conse rvative screening of scenarios. The              factors analysis. Consistency of treatment of these approach is to successively relax the most              comm onalities is an im portant feature in a fire risk significant worst-case assumptions of each              analysis. Although the overall evaluation process fire-initiated scenario and re-evaluate the            is the sam e, there are diffe renc es in th e events impact of the fire on plant performance.                postulated to occur in response to an internal fire De tailed phenomenological fire growth                  event as com pared to those from a traditional analyses found in such computer codes as                internal event. These differences are described 3-126
: 3. Technical Activities below in general terms. More detailed guidance                    A quantitative screening process is performed can be fo und in NR C (1 997 ) and Boh n (19 90).                  during the deta iled scenario analysis phase of the analysis. The screening process applies numerical The specific goals of this task include the                        criteria to determine the relative risk significance of development of a fire frequency database, the                      each fire scenario. If it is determ ined that a determination of the frequen cy of specific fire                  scenario is insignificant compared with these scenarios, the further development and refinement                  numerical screening criteria, th at s cenario is of fire scenarios (including the consideration of fire            removed from further consideration in the PRA grow th and suppression), the determination of the                models. Therefo re, it is very im portant that the fire fire damage and plant response, and the                            occurrence frequencies assessed during this quantification of the fire scenarios including the                activity of the pro cess satisfy the following assignment to specific plant damage states. The                    objectives:
hazard occurrence freque ncy and a set of "worst-case" plant impacts are assessed for each
* The frequency of the postu late d scenario must sc enario developed in the spatial interactions                        consiste ntly accoun t for industry fire data and analysis.          Each scenario is then screened                      any plant-specific experience for the type of quantitatively to determine its risk sig nificance in                  hazard being evaluated in the type of location relation to other initiating events. Scenarios that                    being modeled.
are found to be quantitatively insignificant are d o c u m e n t e d a n d r e m o v e d f r o m f u r th e r
* The frequency of the postu late d scenario must consideration.          For those sc enarios that are                  provide a conservative upper bound for the retained, additional analysis is perform ed to                          actual frequency of more detailed event sys tem atic ally refine the initiating event frequency                scenarios that may eventually be developed for and functional impacts an d to develop a m ore                          the location. In other words, th e total scenario realistic assessment of the risk significance of each                  frequency may be consistently sub divided to retained scenario.          Section 4 of Bohn and                      m ore re alistica lly rep resent any specific event Lambright (1990) provides a more detailed                              sce na rio in the loc ation, if it is neces sary to discussion of the analysis of fire-induced                              develop m ore detailed m odels for the location.
scenarios, once the fire scenarios have been identified.        The goals for this activity are                These two objectives are somewhat counteractive.
accomplished by the performance of five tasks:                    The first objective is to develop an event frequency that is as re alistic as possible while the second
: 1. Assessment of the Fire Hazard Occurrence                    objective is to develop an event frequency that is Frequencies                                                  sufficiently conserva tive to ensure that the hazard
: 2. Assessment of W orst-case Plant Impact for                  sc enario is not inappropriately screened from the Ea ch Sc enario                                              PRA mod els. Thus, in effect, the analysis must
: 3. P er f orm a n c e  of  Qu a n tita tive Scenario          develop an initial frequency estim ate that is Screening                                                    "reasonably conservative" for each defined
: 4. Refinement of Scenario Frequency and Impact                  scenario.
An alysis
: 5. Retention of Risk Significant Scenarios.                    The first activity of the fire frequency assessment involves a thorough review of the industry Each of these activities is discussed below.                      experience data to develop a "sp ecialize d generic data bas e." This database should account for Task 1 - Asses sm ent o f the F ire Haz ard                        design fea tures of the plant being evaluated and Occurrence Frequencies                                            should be consistent with the scope of the PRA model and with the characteristic s of the specific Each fire scenario in the spatial interactions                    haza rd scenarios de fined for the ana lysis. If data analysis is defined at the location level, i.e., a                from plants other than VVERs are used, care must sc enario describes a fire of any severity that can                be taken to properly interpret the data. Fire occur anywhere in a given location. The o bjective                incidents that have occurred at a given loca tion in of the scenario frequency assessment is to quantify                a particular plant may be applicable for enhancing consiste ntly a plant-specific fire hazard occurrence              the fire-incident datab ase fo r a d ifferent location in rate for each of these locations.                                  the Kalinin Nuclear Power Station. The experience data m ust also be scree ned to rem ove fire events 3-127
: 3. Technical Activities that occurred during periods other than plant                  example, an air compressor may be located in an operation, such as during construction or refueling            open corner of a large cable spreading room. The (since the Kalinin PR A only considers th e ris k of          air com pressor m ay n ot be important for the PRA power operation). A tabulation of both U.S. and                models. However, the spa tial interac tions a nalysts international fire incidents , including the KN PS Un it      defined the functional impact location to include the 1 fire of 1 984, and insights from them are available          entire cable spreading room.          The estimated from Nowlen (20 01).                                          frequency for fire events in this location must account for the com posite nature of the fire The product from this activity of the frequency                hazards. It is unreasonable to develop a fire assessment process is the specialize d generic                occurrence frequency based only on "ca ble database. This database should contain only the                spreading room" fire events, even though the PRA hazard event summ aries considered relevant for                impac ts are derive d only from failures of the the plant being modeled, for the specific operating            cables. Use of only cable spreading room fire data conditions being evaluate d, and for the specific              would underestim ate the expecte d frequency of scope of the functional impact locations and                  fires in this location. On the other hand, it is also scenarios defined in the analysis. This database              unreasonable to develop a fire occurrence should be documented and should provide the                    frequency that is based on data from plant ge ne ric industry experien ce inp ut to the                  locations that typically contain air compressors, environmental hazard frequency analysis.                      e.g., open area s of a turbine building. Direct use of only these data could significantly overestimate the The industry event data can be com bined with                  expected frequency of fires in the cable spreading actual plant-specific experience through a                    room because of lower traffic densities, less two-stage Bayesian analysis that form s th e basis            transient combustibles, etc. in these rooms as for the fire hazard frequency assessm ent. This                compared to in the turbine building.
process is consistent with the evaluation of all other data in the PRA, including the frequencies for                These situations are addressed by developing a internal initiating events, component failure rates,          com pos ite haza rd freque ncy tha t acc oun ts for the component maintenance unavailabilities, and                    types of equipm ent and the relative density of equipment comm on-cause failures.                              equipment in each location. Continuing with the above example, a com pos ite fire frequency would Bayesian analysis allows the industry data to be              be developed for the cable spreading room by combined with actual experience from the plant                adding a fraction of the "turbine building air being stu died. T he first sta ge of this analysis            com pressor" fire event frequency data to the cable develops a generic frequency distribution for each            spreading room fire event frequency data. The hazard that consistently accounts for the observed            fractions are generally based on the equipment site-to-site variability in the industry experience            locatio n information documented in the spatial data. The second stage updates this generic                    interactions analysis. They are also often based on frequency to accou nt specifica lly for the actual            general observations from the plant walkdown and historical experience at Kalinin.                              the persona l experience and judg m ent of the fire analysis experts. The fractions are not usually Estimates are made of the fraction of each ha zard            derived from detailed deterministic models or and hazard type for each locatio n. F or exam ple, it          numerical analyses. The primary objective of this wo uld be noted that two of the six batteries at the          process is to develop a re asonable estimate for the plant are found in a specific location.            The        hazard frequency that consistently accounts for the determ ination of the fraction of cables found in a            actual configuration of equipment in the location.
specific location would also be m ade by a                    Thus, for the cable spreading room exam ple, it is structured estimation process. These estimates                not reasonable to assess a fire event frequency are necessary in order to partition the hazard                that is only based o n either extreme of the occ urrence frequen cies to specific location s.              available data.        It see m s rea son able to acknowledge that the air com pressor may In most cases, it is necessary to combine data for            con tribute to the frequency of fires in the room.
various types of hazards to develop the best                  The precise fractio n used in the frequency poss ible frequency estimate for a particular                  calculation m ay be based only on the analyst's location. Th is type of "composite" frequency                  judg m ent.      However, once the fraction is analysis is best illustrated by an example. For                documented, it is po ss ible to test whether the 3-128
: 3. Technical Activities results are sensitive to that judgm ent by sim ply            The assumed failure modes depend on the normal varying the numerical value with in re asonable              status of the equipment, the PRA m odel success bounds.                                                      criteria, characteristics of the location, and the type of vulnerability. Fo r ex am ple, an electrical cable Task 2 - Assessment of Worst-Case Plant                      may not be vulnerable to a floo ding event at a Impact fo r Each Sce nario                                    given location even if it were submerged by the flooding incident but is susceptible to potential The task Spa tial Interactions identifies the PRA-            dam age had a fire occu rred in that loc ation.
related equ ipm ent that m ay b e damaged by each hazard in a particular functional impac t location . In      All fires that affect electrical cables are assumed to this activity, analysts who are very familiar with the        eventua lly cause an open circuit in the cables.
PRA event sequence models and syste m fau lt                  How ever, "hot shorts " m ay occur when insulation trees develop a conservatively bounding set of                fails between adjacent conductors or between impac ts for each hazard scenario. These impac ts            energized conductors and ground. These short determine the specific equipment failure m odes              circu its are only of concern in those portions of assigned when the hazard scenario is evaluated in            instrumentation and control circuits that produce the PRA risk m odels.                                        signals to operate equipment. For example, a hot short in a power cable cannot start a motor.
The initial impacts assigned during this phase of            Therefore, hot shorts in power cables are modeled the analysis are considered to be the worst-case              with the same impacts as open circuits ; it is combination of failures th at c ould conceivably be          assum ed that the affected motor will not operate.
caused by the haza rd. It is importa nt to ensure that        How ever, a hot short in a control circuit may cause the assigned impacts provide a conservative upper            a spurious signal to sta rt the m oto r, if pow er is bound for all actual failures that may occur during          available to it. The impacts from p os sib le hot any fire scenario postulated to occur in the location.        sho rts in control circuits are assessed by first If it is determined that the scenario is quantitatively      assuming that power is available to operate the insignificant even within the context of these                component when the sh ort circuit occurs and then bounding impac ts, then there is reasonable                  assuming that the powe r fails. F or exam ple, it is assurance that a more realistic appraisal of the              assumed that a hot short will cause a spurious potential impact would confirm the risk to be much            signal to open a normally closed motor-operated lower than the screening value. The following                valve. It is further assum ed that powe r is a vailable exam ples illustrate the types of considerations              to the valve motor, that the valve opens used for assigning worst-case impacts.                        successfully, and that power is then lost to the valve m oto r. T hus, th e net effe ct from this At this point in the analysis, all equipment in the          assessment is to leave the valve failed in the open location is assume d dam aged by the fire,                    position. This assessment of hot shorts is applied regardless of the size of the location, the number of        only for equipment failure modes that have a affected componen ts, and the observe d distribution          negative im pact o n the availability of PRA of hazard severities. For most plant locations, the          equ ipm ent. The m ode ls do n ot include c redit for numerical risk contributions may be several times            po ss ible hot shorts that may reposition higher than from a m ore deta iled hazards analysis          com pon ents in their required configuration for because the occurrence frequency is usually                  accident mitigation.
dominated by relatively insignificant eve nts, e.g.,
sm all fires of short duration and not by a fire that        The sam e types of as sum ptions are a pplied to could pre sum ably damage all equipment in a given            solid-s tate electronic circuits. It is first assumed location.      This approa ch ensu res that a                that spurious control signals will reposition conse rvative upper bo und is generated for the risk          equipment in a state that has the worst possible contribution from any fire hazard event that may              impact on PRA system availability. After the damage multiple components within the location.              equipment has changed state, it is then assumed For example, it is not necessary to determine                that subsequent open circuits will prevent which specific cables may be damaged in a                    autom atic or manual signals from restoring the particular set of cable trays if the impact                  components to the desired state.
assessment ass um es that any fire in the location damages all cables.                                          The impact assessments do not account for the relative timing of possible failures or for design 3-129
: 3. Technical Activities features that may prevent certain combinations of              activity is the starting point for refinement of the failures. For example, the PRA success criteria                sc enario and a m ore realistic a sse ssm ent of its may require that a pump mus t be tripped to avoid              impacts. The refinem ent process m ay involve poss ible dam age after los s of oil c ooling. A              several iterations. Each iteration typically includes poss ible fire sc ena rio m ay affe ct co ntrol circuits      a critical reexamination of only the most important that signal cooling water supply valves, e lectronic          impac ts for that sc enario.          C onserva tively, circu its that process th e auto m atic signals to trip        bounding assum ptions are retained for impacts that the pump, and circuit breaker controls for the                have a relatively insignificant effect on overall risk.
electrical bus that supplies power to the pump                The goals of this process are to successively relax m otor. The worst-case im pacts from this scenario            the most significant worst-case assumptions for are bounded by the follo win g com binatio n of                each scenario, wh ile re tain ing an overall conditions:                                                    conse rvative approach throughout the screening process.
* It is assumed that the cooling wate r supply is disabled by hot shorts and/or open circuits that          Task 3 - Performance of Quantitative affect the valve controls.        This condition        Scenario Screening requires that the pump m ust trip.
Each hazard scenario is characterized by a hazard
* It is ass um ed that the pum p trip circuits are          occurrence frequency and a set of functional disabled by hot shorts or open circuits that              impac ts that affect the availability of various PRA affect the electronic circuits.                          com pon ents and system s. In this activity of the analysis, each scenario is propagated through the
* It is assumed that power remains available for            PRA risk models to determine a quantitative upper the pum p m oto r un til the pum p is damaged. If        bound for its total contribution to plant risk. Thus, the affected bus also supplies power to other            for example, scenario FIRES1 from Table 3-15 is PRA equ ipm ent that m ust opera te to m itigate          evaluated with an initiating event fre quency of the event, it is assumed that power is not                approximately 3.96 x 10 -3 fire per room-year. The available for these com ponents as well.                  general transient event trees in that study were quantified for this event, assuming that all This asses sm ent provides the m ost conse rvative            equipment m odeled by Top Events BA, BU, com binatio n of impac ts that could possibly occur,          and EP are failed. All other PRA equipment not without regard to the relative timing of failures or          affected directly by this fire are allowed to function the actual likelihood for any of the specific impacts.        at performance levels consistent with the availabilities evaluated in the respective system The impac t assessm ents at this stage of the                  analyses. In the Kalinin PRA, it m ay be m ore analysis does no t account for poss ible operator              app ropriate to add house events to th e syste m fau lt actions to override or bypass faulty control circuits          trees to represent th e im pact of specific or to operate equ ipm ent loc ally. No recovery                environm enta l hazard-induce d failure s.
actions are modeled for any damage caused directly by the fire hazard event. Other operator              The plant damage state assignments will be actions are m odeled only within the context of the            consistent with those already developed for the entire sequence of events initia ted by the hazard            internal events model, since the same plant event scenario, consiste ntly w ith dynamic actions                  sequence logic models are employed to quantify evaluated for similar internal initiating events.              the impac t of the postulated fire hazard as were used for the internal event initiators.
The affected PRA equipment and the functional impac ts from each hazard scenario are listed in              Each hazard scenario generally results in a large each scenario table as shown in Sec tion 3.2.3                number of individual detailed event sequences (refer to data entry 7 in Table 3-14 as an exam ple).          determined by the combined effects from the In most cases, explanatory notes are also provided            hazard-induced failure s, the i ndepe ndent in data entry 9 to document more com pletely the              equipment successes and failures, and ap prop riate bases for the assigned impacts.                                operator actions. All sequences that lead to core damage are recorded, and the total core damage If a particular hazard scen ario requires m ore                frequency is com pare d with a numerical screening detailed analysis after the initial screening, th is          criterion to determine the relative risk significance 3-130
: 3. Technical Activities of the scenario.                                              insignificant. The relative importance of each sc enario that rem ains above the lim it is consisten tly
* If the total core dam age frequency from all              evaluated with all other events modeled in the sequences initiated by the fire-initiated                PRA.
sc enario falls below the screening criterion, it is concluded that the hazard produces an                  Selection of the screening criterion is not a sim ple insignificant contribution to overall plant risk.        task.      There are no general guidelines or The screening evaluation is documented, and              "accepted" numerical values that ca n be broadly the scenario is removed from further                      applied for any particular analysis. The selected consideration in the PRA models.                          value, however, must satisfy the following criteria:
* If the total core damage frequency from the
* The value must be low enough to ensure that fire-initiated scenario is higher than the                      the screened scenarios are truly insignificant to screening criterion, the scenario is retained for              the total risk from the plant being evaluated.
further analysis in the PRA.
* The value m ust be high enough to facilitate a
* If the poten tial plant da m age            state              practical analysis that limits unreasonable consequences from the fire-initiated scenario                  efforts to develop detailed models for are unusual or severe, the scenario is retained                unimportant events.
for further analysis, even if its total core damage frequency is below the screening
* The value chosen should be re latively criterion.                                                      insensitive to future refinements in the PRA event sequence models, systems analyses, Although the m ech anics of th is proces s are quite                and data.
straightforward, several considerations must be noted to develop the proper perspective and                    In gen eral, these criteria are best served by context for this important activity in the overall            delaying the screen ing proce ss u ntil the res ults analysis.                                                      from the analyses of interna l initiating events have reached a point of rela tive m atu rity and sta bility, T he methods used to assess the hazard initiating              i.e., a point at which the interna l events results are event frequen cy and the attendan t im pacts from              not expected to change "significantly." Screening the postulated scena rio ensure that the evaluated            values are typically selected to ensure that the total core damage frequency is a conservative upper                  core damage frequency from each screened bound for the actual core damage frequency that                sc enario is less than approxim ate ly 0.05 percent to may occur from any particular scenario in the                  0.1 perc ent (i.e., 1/2 0 to 1/10 of 1 percent) of the location. The amount of conservatism depends on                total core damage frequency from all other a variety of factors that cannot be estimated                  contributors. Thus, for example, if the screening directly without considerable examination of the              criterion is numerically equal to 0.1 percent of the underlying models and analyses. However, the                  total core dam age frequency from all other causes, applied methods do provide assurances that no                  an absolute minimum of 1,000 scre ened ha zard similar scenario can yield a higher core damage                scenarios would be required to double the total frequency evaluated during the screening analysis.            core dam age frequen cy. If the screening analysis is performed at an early stage of the PRA modeling The applied screening criterion is a n ab solute              process, it is then generally recomm ended that the numerical value that defines what is con sidered to            screening values be set equal to a smaller be an "insignificant" core dam age frequency. This            percentage of the preliminary core damage type of analysis is not unique to the evaluation of            frequency results. This avoids the need for internal plant hazards. In fa ct, im plicit and explicit      inefficient rescreening if, and when, PRA modeling screening criteria are applied at all levels of a              refinements have reduced the contributions from all practical risk a sse ssm ent. How ever, it is worth            other accident initiators.
noting that the screening criterion for this analysis effectively defines a n ab solute lowe r limit for the        Thus, the final screening value cannot be resolution of concerns about the risk significance            determined at th is time. For some perspective, from internal plant hazards. Scenarios that fall              howeve r, the screening value used in one recent below the limit are, by definition, considered to be          study was 1 x 10 -9 core dam age even t per year.
3-131
: 3. Technical Activities Task 4 - Refinement of Scenario Frequency                              recovery action s to m itigate the haza rd or its and Im pact An alysis                                                  impac ts before specific event sequences progress to core damage.
Each fire hazard scenario that yields a total core damage frequency exceeding the screening
* Models may be developed to m ore rea listic ally criterion is retained for further analysis in the PRA                  account for phenomenological processes that models. The level of effort and the focus of these                    occur during the stag es of fire initiation, analyses are determined by a balanced                                  growth, detection, and mitigation.
examination of all the contributors to plant risk. In many cases, the upper-bound core damage                          The refinements that are applied for the frequency may be higher than the value used for                  reevaluation of a p articular scenario depend on screening the hazard, but the scenario remains a                specific characteristics of the fire hazard, the very sm all contributio n to overall plant risk.                location, and the functional impa cts from the Extensive effort to further refine these scenarios is            original analysis. The results from the screening not jus tified by practica l consideration s. T heir            evaluations often pro vide valuable insights into the conservatively bounding frequencies a nd im pac ts              sensitivities of the mos t important assumptions and are simply retained in the PRA results.                          conservatisms. The refinement process for a particular scenario may involve several iterations.
An iterative process is performed to refine the                  Each iteration typically includes a critical models, if further analysis is warranted. This                  reexamination of only the m ost im porta nt im pac ts process involves careful ree xam ination of a ll                for that scenario.          Conservatively bounding assumptions and suc cessive app lication of the                  assumptions are retained for all impacts that pr ev io u s a n a l ys i s a c ti v it ie s to d ev elo p      rem ain relatively insignificant to overall risk. The syste m atic ally m ore realistic m odels for the                goals of this p rocess are to systematically relax the scenario definition, the hazard frequency, and the              most significant worst-case assumptions for each assigned impacts. One or more of the following                  scenario, while re tain ing an overall conservative refine m ents are typically made during this phase of            approach throu gh ou t su cc es sive scree nin g the analysis:                                                    evaluations.
* The scenario may be subdivided into a set of                W henever a hazard s cen ario is s ubd ivided, a constituent scenarios that are based on                    sep arate summ ary table is developed to document physical characteristics of the location and the            each refined scenario. These tables have the hazard sources. This process allows the                    sam e format as the original scenario tables. They assignment of more realistic equipment                      list the frequency for each refined hazard event and impac ts from each of the specific haza rd                  the specific im pacts assigned to that event. The conditions.                                                tables als o document all deterministic and probabilistic analyses performed to develop the
* The hazard m ay be subdivided into various                  scenario frequency and its impacts. Each refined severity levels that are based on observed                  sc enario is reevaluated in the PRA event and fau lt experience from the generic and plant-specific              trees, and the results are reexamined in relation to databases. Each hazard severity level is                    the quantitative screening criteria.
examined to define a more realistic set of impac ts that could be caus ed b y an event w ith          Sc enario refinement can continue further.
tha t se verity.                                            Analyses may be required to refine how such phenomena as fire grow th, detection, and
* The assumed impacts from hot shorts and                    suppression are addressed in specific scenarios.
control circuit m alfunctions may be reexamined            If this is the case, codes, such as CO MP BR N IIIE to determine whether the assum ed failure                  (Ho, 199 1), are available an d ha ve been use d to mod es can actually occur in combination.                  suppo rt the probabilistic evaluation of specific fire M o de ls ma y a l s o b e d e v e lo p ed to              scenarios. In practice , such codes are typically probabilistic ally account for the relative timing          only used for a sm all num ber o f scena rios. In fa ct, of these failures.                                          many PRAs do not carry the scenario refinement process to the point where such codes as
* The event sequen ces initiated by the hazard                CO MP BR N are us ed.
may be refined to include possible operator 3-132
: 3. Technical Activities Task 5 -        Retention    of  Risk    Significant        structured to produce a systematic, top-down, Scenarios                                                    iterative, quantitative estimate of the risk from fires in nuclear power plants. A parallel and very similar A com bination of technical and practical                    approach is adopted to determ ine the risk considerations determ ine the final set of plant              asso cia ted with internal flooding. Both analyses internal fire scenarios retained for quantificatio n in      rely on the results of a structured spatial the PR A results . All scenarios that exceed the              interactions analysis, however, each having quantitative screening criteria are retained in the          different nuances.
PRA models. However, among these scenarios, the degree of refinem ent m ay vary considerably.            In fires, significant damage, especially to electronic equ ipm ent, may be caused by smok e.              The
* The worst-case core damage frequency                    construction of postulated scenarios should estimate for an initial hazard scenario m ay in          consider the impact of smok e as well as potential som e cases be numerically higher than the              negative impacts of fire mitigation systems.
screening value, but the scenario still yields a        Operation of m itigation systems could affect the very sm all contribution to overall plant risk.          performance of operating equipm ent and could Extensive effort to further refine these                hinder or delay operators from entering specific scenarios is not justified by practical                  areas for conducting emergency procedures. The considerations, and they are sim ply re tain ed in      effectiveness of fire detection and mitigation the PR A results with their co nservatively              equipment are impo rtant factors when describing a bounding frequencies and impacts.                        fire scenario (starting with fire initiation and proceeding to growth, propagation, detection, and
* In other cases, a scenario may be retained              m itigation).
only after considerable additional analyses have been perform ed to refine conse rvative            Also, some fire-incident databases already have a assumptions about its frequency and impacts.            m easure of d ete ctio n and m itigation included in them. Specifically, some databases would not Because of these differences , it is not possible to          include a fire that is imm ediately detected and develop m ean ingful num erical estim ates for the            extinguished. Only fires that are "s ignificant" are in amount of c onserva tism that m ay re m ain in any            such databases (i.e., some m easure of mitigation particular scenario. However, it is generally true            is implicitly included in the data). Therefore, it is that sce narios that have bee n su bjec t to                  important to understand the nature of the data reexamination and refinement should include less              used before credit for detection and m itigation is inherent conservatism than scenarios retained                cla imed in the re finem ent of scena rios. It m ay from an early stage of their definition.                      prove easier to refine the frequency or impact of a particular scenario, and thus allow screening of the It is also obviously not possible to develop any              scenario, rather than to claim explicitly consider meaningful num erical estim ate s for the "ac tua l"          m itigation.
core damage frequency associated with the screened sce narios. The analysis process is                  Fire frequencies are derived for a generic nuclear structured to ensure that this frequency is very              power plant based on fire sources. For example ,
sm all, compared with other contributors to plant            a frequency is determined for "cable fires" at a risk, but the value is certain ly not zero. In support        nuclear power plant similar to the one under of the analysis conclusions, it is only possible to          consideration using industry data.            Although examine a worst-case conservative upper-bound                "generic" in nature, the data is specialized and numerical value that m ay be derived from the                screened to closely match the characteristics of the succe ssive screening evaluatio ns. This value is            specific plant under consideration.
certainly not a realistic estimate of the actual core dam age frequency from these scenarios.                      The generic fire hazard frequencies should be How ever, it can be stated with assurance that the            updated with the actual experiences at Kalinin.
"true" core dam age fre quency must be considerably lower than this composite screening              The location of the specific hazards has been value.                                                        determined in the task Spatial Interactions.
Estimates are required in this task for the fractions The approach outlined in this procedure guide is              of each hazard source (e.g., cables, motor control 3-133
: 3. Technical Activities centers, and logic cabinets) found in each location.          Research Institute, May 1991.
For a specific location, the frequency of occurrence          LaChance, J., et al., Circuit Analysis - Failure of a fire of an y size is determined by summ ing the          Mode and Like lihood Ana lysis, NURE G/CR-6834, fractional contribution of occurrence from each              Sandia National Laboratories, September 2003.
hazard found in that location.
Nowlen, et al., Risk Methods Insights Gained from A qua ntitative screen ing value is developed to              Fire Incidents, NUREG /CR-6738, U.S. Nuclear identify those scen arios that will be carried forward        Regulatory Com mission, September 2001.
in the analysis.        In other words, only those scenarios that contribute appreciably to the                  NRC, The Use of PRA in Risk-Informed frequency of c ore dam age (o r to specific                  Application s, NUREG -1602, Draft Report for undesirable plant damage states) are retained for            Com ment, June 1997.
further analysis.
3.7      Seismic Analysis Scenarios that survive the quantitative screening are refine d, as app ropriate. Refinement may The analytical tasks associated with a Level 1 involve such considerations as the extent of the probabilistic risk a sse ssm ent (P RA ) for accidents damage initially postulated. The process proceeds initiated by events internal to the plant (such as iteratively until the s cen arios that rem ain trans ients and loss-of-c oolant accidents [LOC As])
appropriately represe nt the risk a sso ciated with are des cribed in Section 3.2. O ther e vents both fires while containing acceptable conservatisms.
internal and external to the plant can cause unique initiating events o r influence the way in which a 3.6.4 Task Interfaces                                        plant resp ond s to an accident. In this section, the way in which a Level 1 PRA is m odified in orde r to The current task utilize s th e sam e overall analysis        model accidents initiated by earthquakes occurring approach and procedures developed for the                    at or near the plant site is described. This means internal event PRA. In particular, this task builds          that the frequency and severity of the ground on the information developed in the task Spatial              motion must be coupled to m odels that address the Interactions. The c onduc t of this task will require        cap acity of plant structures and com pon ents to input from the tasks de aling with Initiating Event          survive each possib le earthquake. The effects of Analysis, Frequency of Initiating Events, Event              structural failure must be assessed, and all the Sequence Modeling, and Sys tem Modeling. It is                resulting information about the likelihood of also likely that spec ific ope rator actions will be          equipment failure must be evaluated using the identified in the fire scenarios, thus prompting an          Level 1 internal event probabilistic logic model of interfa ce w ith the task Hum an R eliability Analysis.      the plant. T his procedure guide is largely based on several earlier guides and studies (Bohn and Ou tput from the Fire Analysis task provides                  Lam bright, 1990; IAEA, 1995; and PG &E, 1988 ).
information on accident sequence definition and on            Material from these sources is used here without frequency of occurrence directly to the Level 2 task          spe cific citations.
which in turn p rovide s so urce term inform ation to the consequence and risk integratio n task.
3.7.1 Assumptions and Limitations W hether or not Level 2/3 analyses are performed depends on the scope of the PRA.
A seism ic PRA ass um es that a single parameter (effective ground acceleration) characterization of 3.6.5 References                                              the earthquake, when combined with treatments of unc ertainty and dependency, can provide an Bohn, M. P., and J. A. Lambright, "Procedures for            ade qua te representation of the effects of s eism ic the External Event Core Damage Frequency for                  events on plant operations.              This approach NUREG-1150," NURE G/CR-4840, Sandia National                  acknowledges that different earthquakes (in terms Laboratories, November 1990.                                  of energy, frequency spectra, duration, and ground displacem ent) can have the same effective Ho, V. S., et al., "COM PBRN IIIE: An Interactive            acceleration.      Therefo re, th ere is not only Com puter Code for Fire Risk Analysis,"                      randomness in the frequency of earthquakes but UCLA-ENG -9016, EPRI-NP-7282, Electric Power                  also larg e uncertain ty in th e specific characteristics 3-134
: 3. Technical Activities of earthquakes of a given effective acceleration.              3.7.2 Products These uncertainties have implications for modeling dependencies among failures of various equipment                The products of this task include, as a minimum ,
under exc itation by earthquakes of a particular                the developm ent of a seism ic haza rd cu rve, a effective acceleration.      Systems analysts and              listing of seismically sensitive equipment and their fragility experts m ust w ork closely together to              fragility values, an identification of seismic-induced determine how to model these dependencies.                      initiators and their frequencies, a listing of the seism ic cutse ts, and the quantification of the A nuclear power plant is usually designed to ens ure            s e i s m i c - in d u ced sce nario s inc luding th e the survival of all buildings and em erge ncy safety            ass ignm ent of spe cific plant dam age states.
systems for a particular size ea rthqu ake, i.e., a design basis or a safe shutdown earthquake. The                Specifically, this task will generate documentation assumptions used in the design proc ess are                    on the following:
determ inistic and are subject to considerable uncertainty. It is not po ssible, for exam ple, to              1. The seismic hazard curve and its basis.
predict accurately th e worst e arthq uake that will occur at a given site. Soil properties, mechanical              2. The original equipment and structures list for properties of buildings, and damping in buildings                      inclusion in the fragility analysis, and the and internal structures also vary significantly. To                    results of the walkdown (composition of the model and analyze the coupled phenomena that                          wa lkdown team and their areas of expertise, con tribute to the frequency of radioactive release,                  revisions to the equipment and struc tures list, it is, therefore, necessary to consider all significant                changes pro jec ted in ana lysis requirem ents as sources of uncertainty as well as all significant                      a result of on-site observations). T he fragility interactions.      Total risk is then obtained by                      curves for plant s tructu res and pro babilistic considering the entire spectrum of p ossible                          safety assessment-related equipment and the earthquakes and integrating their calculated                          details of the fragility analysis.
consequences.          This point underscores an important requirement for a seismic PRA--that the              3. The com plete s eism ic PRA process, i.e., how nuclear power plant must be exam ined in its                          the plant logic modeling team worked with the entirety, as a system.                                                structural analysis team that produced the fragility analysis in defining equipment and During an earthq uak e, all parts of the plan t are                    structures to be analyzed, how the walkdown excited simultaneously. There may be significant                      was conducted including how the structural correlation between component failures, and,                          ana lysts and systems analysts jointly screened hence, the redundancy of safety systems could be                      equ ipm ent, how logic mod els were m odified to comprom ised. For example, in order to force                          incorpo rate structural failures and new emergency core coo ling wa ter into the reactor core                  eq ui p m e n t f a il u re m o d e s , s u m m a r y following a pipe leak or break, certain valves must                    presentations of the results of the seism ic open. To ensure reliability, two valves are located                    hazard and fragility analyses, and the results of in para llel so that should on e valve fail to open, the              quantification of the seismic PRA model second valve would provide the necessary flow path. Since valve failure due to random causes 3.7.3 Analytical Tasks (corrosion, electrical defect, etc.) is an unlik ely event, the provision of two valves provides a high The scope of the seismic analysis should include:
degree of reliability.        However, during an earthquake, both valves would experience the Task 1 Se ism ic H aza rd Analysis sam e accelerating forces, and the likelihood is high Task 2 Structures and Com ponent Fr ag ility that both valves would be dam aged, if one valve is An alysis damaged. Hence, the redundancy built into the Task 3 Pla nt Logic Analysis design would be comprom ised. The potential Task 4 Quantification impact from this "co m m on-c aus e" failure pos sibility represe nts a potentially significant risk to safely Each of these tasks is discussed below. These shutting down nuclear power plants during an tasks are linked in that the first two are use d to earthquake.
form ulate the required changes to the internal events plant model to support seismic PRA.
3-135
: 3. Technical Activities Alth ough the first three tas ks will be performed by          ground m otion (a ttenuation) model. Questions different gro ups, th ese groups m ust wo rk in                directed to experts cover the following areas:
conce rt to ensure proper and consistent modeling              (a) the configuration of seismic source zones, of se ism ic-indu ced events.                                  (b) the maximum mag nitude or inten sity earthquake expected in each zone, ©) the Se ism ically induced failures can cause one or                earthquake activity rate and occurrence statistics m ore of the internal event initiators already                  associated with each zone, (d) the methods for described in Section 3.2 to occur. Although                    predicting ground motion attenuation in the zones specific seism ic acc eleration s are generally                from an earthquake of a given size at a given considered to yield specific initiating events, the          distance, and (e) the poten tial for soil liquefaction.
results from such accelerations mus t inte rrupt full power operations in functional ways already                    Using the info rm atio n provided by experts, seism ic described in previous task s. The d ifference with              hazard evaluations for the site are performed. The se ism ic events, as compared to other upset                    hazard results thus obtained using e ach expert's conditions, is that m ultiple plant functional initiators      input are com bined into a single hazard estimate.
may occur along with seismically induced failures              Approaches use d to gene rate the su bjec tive inpu t, of equipme nt needed for controlling the event                  to assure reliab ility by feedback loops and cross-sequence as well as physically and psyc hologically            checking, and to account for biases and modes of impacting operator performance.                                judgm ent are described in detail in Bernreuter (1981).
Ta sk 1 - Se ism ic Haza rd An alysis To perform the seism ic PRA, a fam ily of hazard For a given site, the hazard curve is derived from              curves and either ensembles of time histories or a combination of recorded earthquake data,                      site ground motion spectra must be available. To estimated earthquake magnitudes of known events                obtain these for a site with no previous for which no data are available, review of local                inves tigation usually involves 6 to 12 months of geological investigations, and us e of expert                  effort to develop and process a database on judgment from seism ologists an d ge ologists                  earthquake occurrences and attenuation relations familiar with the region. Th e reg ion aroun d the site        as des cribed ab ove.          For some locations (say within 100 km ) is divided into zones, each                (e.g., sites in the western United States, where the zone having an (assumed) uniform m ean rate of                  hazard curves are closely tied to local tecton ic earthquake occurrence. This mean occurrence                    features that ca n be identified and for which a rate is determined from the historical rec ord, as is          significant datab ase of recorded earthquak e tim e the distribution of earthquake magnitudes. An                  histories exists), it is usually necessary to go attenuation law is determined that relates the                  through this process for each individual plant site.
ground acceleration at the site to the ground acceleration at the earthquake source, as a                    Evaluation of the site-specific haza rd curve is function of the earthquake magnitude.                The        generally performed by geologists and ground unc ertainty in the attenuation law is specified by the        motion spe cialists using the methods desc ribed in standard deviation of the data (from which the law              Bernreuter (1981), IAEA (199 3), and PG&E (1988).
was derived) about the mea n attenuation curve.
These four pieces of information (zonation, mean                Task 2 - Structures and Comp onent Fragility occurrence rate for each zone, magnitude                        Analysis distribution for each zone, and attenuation) are combined statistically to generate the hazard curve.            Using the models developed for internal events PRA as a basis, a list of equipment and the The low level of seis mic activity and the lack of              buildings that house them m ust be provided to the instrument rec ordings generally m ak e it difficult to        fragility analysts. Necessarily, this list will combine carry out a seismic hazard analysis using histo ric            sim ilar equipment into convenient categories rather data alone. Current s eism ic ris k m ethod use the            than identifying each of the possible risk-related judgment of experts who are familiar with the area              com pon ents in the plant. T ypically, equ ipm ent w ith under consideration to augment the database.                    median acc eleration capacities of about 4g or higher will not be analyzed because the frequency Expert opinion is solicited on input parameters for            of such events that can generate this acceleration both the earthquake occurrence model and the                    on equipment is very low.
3-136
: 3. Technical Activities The fragility descriptions are based on a two-
* Responses of components with different parameter lognormal distribution where  R is the                    vibrational frequencies are esse ntia lly logarithm ic standard deviation due to randomness                    uncorrelated even when mounted on the same in the earthquake and U is the logarithm ic                          floor.
standard deviation due to uncertainty or state of knowledge (Kennedy et al., 1980; Kaplan, Perla,
* Fragilities of components with different and Bley, 1983). A simplified composite or mean                      vibrational frequencies and adjacently m ounted fragility curve (Kaplan, Bie r, and Bley, 1992) can be                sho uld be treated as indep end ent.
defined with a single com posite logarithm ic standard deviation,  U.          The tails of these
* The piping fragility should be treated such that distributions are considered to be conservative.                      each segment, between rigid supports or Therefore, the follo win g is the basis for truncation                between equipment, is considered to be of the fragility curves in th is project:                            independent of the other segments.
: 1. The unc ertainty variability,  U, should not be
* The fragility of conduits and cable trays is truncated.                                                      considered to represent all the conduits and cable trays largely because of the natural
: 2. The rand om variab ility,  R, sh ould be truncated              flexibility existing in cables; that is, individual at about 1 perce nt failure fractio n fo r relatively            cable trays and conduits are not considered ductile com ponent failure m odes, su ch as in                  independently. By their very nature, large piping system s and in civil structures. In                      physical movem ents do not mean cable failure.
addition to the civil structures and piping, com pon ents in the plant tha t are generally in
* The fragility of he atin g, ventilatio n, and air this category are:                                              conditioning ducts is considered to represent that of all the ductwork supporting a single
    -    reactor internals                                          safety system.
    -    pressurizer
    -    reactor coolant pumps                                Using these guidelines, th e plant m odel assumes
    -    control rod drives                                    total dep end enc y for iden tical equipm ent at the site
    -    component cooling water surge tank                    (that is, if one fails, all of the same type fail). All
    -    battery racks                                        other equipment situations follow the definitions
    -    impulse lines                                        abo ve or othe rwise are cons idered inde pen den t.
    -    cab le trays and s upp orts
    -    heating, ventilation, and air conditioning            Ta sk 3 - Pla nt L og ic Ana lysis ducting and supports.
Seismic event trees should be derived from those
: 3. For all other plant components, the truncation              already developed from the internal events point should be at a significantly low er failu re          analysis. Howe ver, passive components, such as fraction, 0.1 perc ent.                                    pipe segm ents , tanks, and structures w hich were not modeled because of their low probability of Since the response spectra from a given                          failure, m ust now be included in the event tree earthquake are com mon to all of the plant                      analyses. Seismic failure of passive components com pon ents to some degree, we can expect some                  is possible and must be investiga ted in the fra gility correlation of failure between components having                analysis of Activity 2. Com pon ent failure du e to similar vibrational frequencies. Studies to assess              seism ic failure of structures hou sing (or supporting) these correlations (Kenned y et al., 1988)                      the component must be considered as well. These concluded the following:                                        new failure modes will entail revision of fault trees and event trees generated in the internal events
* Except at high frequencies (greater than about              analysis. One p articular seismic-related failure 18 Hz), re spo nse s of identica l com pon ents            mod e is relay ch atter (B ley et al., 198 7; Bu dnitz, with the same frequencies should be treated                Lam bert, and Hill, 1987; La m bert a nd B udn itz, as totally dependent, even when mounted at                  1989). Re lays m ay chatter m om entarily (electrical different elevations in differe nt structures              con tacts open and close) causing lockup of control located at the site.                                        circu its that can only be overrid den by com pletely de-energizing the control circuits, which can be a 3-137
: 3. Technical Activities difficult situation for op erato rs to d iagnose . A            combined with the random failure probabilities, are com parable issue is fire-induced spurious signals              used to probabilistically cull these trees that that have to be addressed in a fire risk analysis.              assures that important correlated cutsets are not lost (involving dependen t seismic failure m odes).
Earthquakes can lead to seismically induced fires, which m ay be d ifficult to control due to the effect of        Com ponent seismic fragilities are obtained either the earthquake on plant accessibility and human                  from a generic fragility database or developed on a performance. Similarly, seismically induced floods              plant-specific basis for components not fitting the should be investigated. Just the impacts on                      generic component descriptions. At least two acc ess ibility and hum an performance can cause                sources of fragility data are available. T he first is human failure events that would otherwise not                    a datab ase of ge neric fragility functions for occur under normal circumstances.                                seism ically induced failures originally developed as part of the SSMR P (S m ith et al., 1981). Fragility LOCAs (from vess el ru ptu re, large, m edium an d              functions for the generic categories we re sm all LOCAs) and transient events should be                    developed based on a combination of experimental included in the seism ic ana lysis. The two types of            data, design analysis reports, and an ex tensive transients that sh ould be considered are those in              expert opinion su rvey. The e xpe rim enta l data which the powe r conversion system is initially                  utilized in developing fra gility curves were obtained available and those in which the power conversion                from the results of the manufacturers qualification system is unavailable as a direct consequence of                tests, independent testing lab failure data, and data the initiating event.                                            obtained from an extensive U.S. Corps of Engineers testing program . These d ata were The frequencies of vessel rupture (reactor                      sta tistic ally combined with the expert opinion pressure vessel) and large LOCA events can be                    survey data to produce fragility curves for the determined from the pro bability of seism ic failure of          generic component categories.
the major reactor coolant system com ponent supports. The medium and small LOCA in itiating                  A second useful source of fragility In form atio n is a event frequencies can be computed based on a                    compilation of s ite-specific fragilities (Cam pbell statistical distribution of pipe failures computed as            et al., 1985) de rived from pas t se ismic PRAs part of the Seismic Safety Margins Research                      prepared by Lawrence Livermore National Program (SSM RP).                                                Laboratory. By selecting a suite of site-specific fragilities for any particular component, one can The probability of transients with the power                    obtain an estim ate of a generic fragility for that conversion system unavailable is based on the                    com pon ent.
prob ability of loss-of-offs ite pow er. This will alwa ys be the dominant cause of these transients (for the              Following the pro babilistic screening of the seism ic m ajority of plants for which loss-of-offsite power              accident sequences, plant-specific fragilities are causes loss of m ain feedw ater). The pro bab ility of          developed for com ponents not fitting in the generic the transients with the power conversion system                  data base categories as determined during the plant available is computed from the condition that the                visit. Thes e are developed either by analysis or by sum of a ll the initiating event probabilities                  an extrapolation of the seism ic equipment considered must be unity. The hypothesis is that                qualification tests.
given an earthquake of reasonable size, at least one of the initiating events will occur.                        Building and component seismic responses (floor slab spectral accelerations as a function of The fault tree s de velop ed fo r the inte rnal events          acceleration) are computed at several peak ground analysis are used in this analysis although the fau lt          acceleration values on the hazard curve. Three trees will re quire m odificatio n to include basic              basic asp ects of s eism ic response (best estimates, events with seismic failure modes and resolving                  variability, and correlation) must be estimated.
the trees for determining pertinent cutsets for seism ic PR A ca lculation s. A screening analysis is            For soil sites, SHAKE code calculations (Schnabel, performed to iden tify the seism ic cutsets.                    Lysm er, and Seed, 1972) can be perform ed to Cons ervative bas ic eve nt probabilities, based on              assess the effect of the local soil column (if any) on the seism ic failure probabilities evaluated at a high          the surface p eak grou nd a cce leration and to earthquake peak ground acceleration level                        develop strain-dependent soil properties as a 3-138
: 3. Technical Activities function of acceleration level. This permits an              basic modeling structure could be used to predict appropria te eva luation of the effects of                    seismic failure of structures and components.
nonhomogeneous underlying soil conditions that can strongly affect the building responses.                  How ever, the usual practice in seism ic PRA is still to employ outside experts to perform the seism ic Building loads, accelerations, and in-structure              hazard and fragility analyses. These exp erts must response spectra can be obta ined from m ultiple              work very closely with the PRA team to ensure that tim e history analyses using the plant design, fixed-        seism ic failure modes of equipm ent im ply base beam element mod els for the structures                  functional failure as required for PRA m odels.
combined with a best-estim ate m odel of the soil            E xam ples abo und of PRA errors caus ed b y the colum n un derlying the plant.                                lack of co m m unication b etwe en s ystem s an alysts and struc tural an alysts.
Task 4 - Quantification 3.7.4 Task Interfaces Quantification proceeds through a process of convolution of the seismic hazard curves with the            The current task utilize s th e sam e overall analysis structures and com ponent fra gility curves to obtain        approach and procedures developed for the prob ability of each elements failure under each            internal event PR A. In particular, this task builds discrete earth qua ke acc eleration, alon g with              on the information developed in the task Spatial integrated plant response and proper treatment of            Interactions. The c onduc t of this task will require coupling due to the e arthq uak e. Then, for each            input from the tasks dealing with Initiating Event acceleration range, the failure probabilities due to          Analysis, Frequency of Initiating Events, Event the earthquake are propagated through the event              Sequence Modeling, and Sys tem Modeling. It is tree/fault tree model along with the probabilities of        also likely that specific operator actions will be independent failu res. E ss entially, for each discrete      identified in the seismic scenarios, thus prompting earthquake acceleration level, the quantification            an interface with the task Human R eliability process follows the activities for the interna l events      Analysis.
analysis. One of the fundamental distinctions is the integration of the exce eda nce frequen cy probab ility      Output from the Seismic Analysis task provides curve for seismic events into the overall results.            information on accident sequence definition and on frequency of occurrence directly to the Level 2 task The theory behind, and practice involved with,                which in turn p rovide s so urce term inform ation to performing a seismic PRA are well documented in              the con seq uen ce a nd risk integration task.
the open literature and will not be replicated here.          W hether or n ot Level 2/3 analyses are performed Papers that describe the m ethodology for                    depends on the scope of the PRA.
conducting a seismic PRA for nuclear power plants (in particular, Ang and Newmark, 1977; and 3.7.5 References Ke nnedy, 1980) begin concep tually and then m ove to fully plant-specific analysis techniques. The Ang, A. H.-S. and N. M. New m ark, A Probabilistic SSMRP generated significant information that Se ism ic Assessment of the Diablo Canyon Nuclear underpins m uch of the later work in this area Power Plant, Report to U.S. Nuc lear Regulatory (Sm ith et al., 198 1). W ith the publication of the C om m is s i o n , N. M . N ew m ar k C on su ltin g Zion and Indian Point Probabilistic Safety Studies Engineering Services, Urbana, IL, Novemb er 1977.
(ComE d, 1981; ConEd, 1983), the basic approach becam e well established. More recently, the Bernreuter, D. L., Seismic Hazard Analysis:
Diablo Canyon Long-Term Seismic Program Application of M etho dology, Re sults and Sen sitivity (PG&E, 1988), perform ed by a U.S. utility company Stud ies, NURE G/CR-1582, Lawrence Livermore with strong review and direction provided by the National Laboratory, October 1981.
U.S. Nuclear Re gulatory Co m m ission , extended the thoroughness of seismic PRA by including Ble y, D. C ., et al., "T he Im pact o f Seism ically extensive tes ting and analysis involving all Induced Relay Chatter on N uclear Plant R isk,"
disciplines related to seismic risk. This detailed Transactions of the N inth International Conference work led to improvem ents in the seismic PRA on Structural Mechanics in Reactor Technology, m odels and gene rally supported the idea that the Vol. M, "Structural Reliability Probabilistic Safety Assessm ent," pp. 23-28, August 17-21, 1987.
3-139
: 3. Technical Activities Bohn, M. P., and J. A. Lam bright, Procedures for            Kaplan, S., H. F. Pe rla, and D. C . Bley, "A the External Events Core Dam age Frequency                    Methodology for Seism ic R isk Analysis of Nuclear An alysis for NUREG-1150, NUREG/CR-4840,                    Power Plants," Risk Analysis, Vol. 3, No. 3, Sandia National Laboratories, November 1990.                  September 1983.
Budnitz, R. J., H. E. Lambert, and E. E. Hill, Relay        Ke nnedy, R. P., et al., Studies in Support of Chatter and Operator Response after a Large                  Fragility Analysis for Diablo Canyon Lon g-Term Earthquake: An Improved PRA Me thod ology with                S ei smic P r o g r a m ,  S tr u ctur al M ec ha nic s Cas e S tu d ie s , N U R E G /C R - 4 91 0 , F uture        Associates, 1988.
Resources Associates, Inc., August 1987.
Ke nnedy, R. P., et al., Probabilistic S eism ic Safety Cam pbell, R. D ., et al., "Seismic Risk Assessment          Study of an Existing Nuclear Po wer Plant, Nuclear of System Interactions ," Transactions of the Eighth          Engineering and Design, 59, pp. 315-338, 1980.
International Conference on Structural Mechanics in Reactor Technology, Brussels, Belgium, August              Lam bert, H.E ., and R. J. Budnitz, "Relay Chatter 19-23, 1985.                                                  and Its Effects on N uclear Plant Safety,"
Transactions of the Tenth International Conference Com Ed, Zion Probabilistic Safety            Stu dy,      on Structural Mechanics in Reactor Technology, Com monwealth Edison Co., 1981.                              Los Angeles, California, August 1989.
ConEd, Indian Point Probabilistic Safety Study,            PG&E, Diablo Canyon Long Term Seism ic Consolidated Edison Co. and New York Power                    Program , Pacific Gas and Ele ctric C om pany, Authority, 1983.                                              1988.
IAEA, Treatm ent of External Ha zards in                    Sc hnabel, P. B., J. Lysmer, and H. B. Seed, Probabilistic Safety Assessment for Nuclear Power            S HA KE  A Computer Program for Earthquake Plants: A Safety Practice, Safety Series No. 50-P-          Response Analysis of Horizontally Layered Sites, 7, International Atomic Energy Agency, 1995.                  EERG 12, Earthquake Engineering Research Center, University of California at Berkeley, 1972.
IAEA, Probabilistic Safety Assessment for Seism ic Eve nts, IAE A-TEC DOC-724, Inte rnatio nal Atomic          Sm ith, P. D ., et al., Se ism ic Safety M argins Energy Agency, 1993.                                          Research Program - Pha se I F inal Repo rt, NUREG/CR-2015, Vols. 1-10, Lawrenc e Liverm ore Kaplan, S., V. M. Bier, and D. C. Bley, A Note on            National Laboratory, 1981.
Fam ilies of Fragility Curves  Is the Com pos ite Curve Equivalent to the Mean C urve? Nuclear Engineering and Design, 1992.
3-140
: 4. DOCUMENTATION This chapter establishes guidance for documenting              Re ports for each of the major technical activities of a PRA. Documentation of the PRA has two major                  the PRA. All of this docum enta tion is the n us ed to objectives:                                                    recast the m odel and results into the Executive Su m m ary. Finally, an Overall Proje ct S um m ary is
* Present the results of the            study  (i.e.,      developed, which pres ents key results and insights comm unicate information), and                            from the work .
* Provide traceability of the work.                          4.1 Documentation in Support                        of Reporting/Communication Docum entation begins with detailed information gathering, calculation sheets, model construction, Table 4-1 briefly sum m arizes the reports use d to and com puter work. Th is m ate rial is fo rm ally document the KNPS PRA . The distribution of documented in task reports that becom e these reports is also indicated in the table. Each appendices to th e PRA R eport. These details , in report is discussed in more detail below.
turn, are abstracted and reorganized into the Main Table 4-1 Documentation for the Kalinin PRA Project Rep ort                                                                    Distribution Exe cutiv e Su mmary Re port                                                NURE G/IA-0212, Volume 1
    - Level 1, Internal E vents
    - Level 2, Internal E vents                                              Pu blicly Available
    - Oth er Events 1 Main Repo rt-Level 1 PRA, Internal Initiators                              NU RE G/IA -021 2, Vo lum e 2, P art 1 Main Repo rt-Level 2 PRA, Internal Initiators                              NU RE G/IA -021 2, Vo lum e 2, P art 2 Main Repo rt-Other Events Analysis (Fire, Flood, Seismic)                  NU RE G/IA -021 2, Vo lum e 2, P art 3 Proprietary/Restricted Distribution Procedure Guides for a Probabilistic Risk Assessment                        NURE G/CR-6572, Revision 1 Pu blicly Available 1
Does not include quantitative results for core damage frequency and radionuclide release frequency 4-1
 
Appendix A The Procedure Guides for a Probabilistic Risk            peer review of the PR A. T his se ctio n provides Assessm ent report documents the technical                general guidance. Reference should be m ade to approach used for the PRA. It was written by the          the technical activities described in Chapter 3 for U.S. team and was m ade available at an early            guidance on specific products expected from stage of the project in order to guide the work          individual tech nical activities.
being done in the R.F. The guides helpe d to assure that the PRA would be done according to            Docum entation supporting the PRA technical an internationally acceptable and consistent              activities should be legible a nd re trievab le (i.e.,
framework.                                                traceable). PR A docum entatio n should clearly indica te the owners approval authorization, as The Project/Executive Summ ary report contains            appropriate.
the objectives of the project, a summ ary of how the project was carried out, and a general summ ary of        The m ethodology that was used in performing the the results of the PRA. The PRA considered only          technical activities in Chapter 3 should be identified the reactor core as a potential source and only full      either in owner-spec ific docum ents or through power operation. A Level 1 PRA (assessment of            reference to existing m etho dology doc um ents . In core damage frequency) and a Level 2 PRA                  addition, any general assumptions, interfaces with (containment perform ance) we re carried out in          other PRA elements, nomenclature, definition of detail. A Le vel 3 P RA was not performed but            terms, or other specific element items that need to guidance on performing such a PRA was provided.          be included should be documented.
The Main Report documents the Level 1 PRA                Information sources, both plant-specific and performed for ac cidents initiated by internal events    generic, used in performing the technical activities at the KNPS. The report was written by the                should be documented including those sources Russians and contains an explanation of the              that are m and atory.
methods use d an d the resu lts of the overall analysis as well as the analysis done for the            Assum ptions and limitations made in performing technical activities within the Level 1 PRA.              the technical activities should be documented.
including those decisions and judgm ents that were The Main Re port also docum ents th e Level 2            made in the course of the analys is.              The Internal Events PRA. This was also written by the        justification should also be inc lude d; the Russians and contains an explanation of the              justification should provide sufficient detail to allow methods used and the re sults of the overall              a reviewer to understand the a ppropriateness of analysis as well as the analysis done for the            the ass um ptio n or the lim itatio n. G eneral or technical activities within the Level 2 PRA.              generic assumptions and limitations should be documented.
The Main Report also includes a description of the analyses performed for Other Events. The section          T he products and outcomes from the technical summ arizes the analyses that were performed for          activities should be documented. These prod ucts acc idents initiated by internal floods, fire and        and outcomes should include those products or seism ic events. It was written jointly by the            deliverables that are necessary to understand the Ru ssian-Am erican team .                                process used to satisfy the technical activities.
The Appendices for the Level 1 and Level 2                The documentation of the technical activities Internal Events PRA were written by the Russians          should indicate the person(s) who developed or and com plem ent the Main Re port by pro viding          prepared the product or outcome and the person(s) more details on the Level 1 and Level 2 analyses.        who reviewed or oth erw ise ve rified th e appropriateness of the product or outcome with a 4.2 Documentation              in  Support      of      printed name and associated signature. The person(s) reviewing, verifying, or otherwise Traceability checking pro ducts and outc om es should not have participated in the preparation of the product or Docum entation should be performed in such a outcome for which they were assigned.
m anner that facilitates applications, updating and A-1
 
APPENDICES A THROUGH D Appendix A APPENDIX A RECOMMENDED SUPPLEMENTAL CCF GENERIC ESTIMATES FOR KALININ PRA BASED ON EXPERIENCE IN THE U.S.
T his a p p e n d ix p rovid e s i n fo r m a t i o n on        A.1                Pressure Sensors supplemental comm on-cause failure (CCF) estimates for som e of the instrumentation and Pressu re sensors include both mechanical (spring control components wh ich are not cu rrently assisted force balance) and electrical (balanced contained in Strom berg et al. (199 5). The specific capacitors) transducers. They can be used for components of concern are:
m eas urem ents of pressure and pressure differential (delta p ressure). The m eas urem ents
* Pressu re senso rs on delta press ure could be indirectly used for level
* Senso rs: flux monitors and flow measurements.                Different types of
* Senso rs: tempe rature detectors pressure sensors used for different applications
* Relays can have significantly different failure rates.
* Analog channel How ever, the estimated generic CC F param eters
* Digital channel.
do not differentiate between different types and applications. Such ge neric CCF e stim ate s could The re is not currently a specific reference be used for the initial phase of quantification.
addres sin g the CC F for all of the above Limited failure data was analyzed in Atwood (1983) components. Several different references were for pressure sensors; howe ver, the pressure reviewed, and that portion of data which was sensors, their logic channel, relays, and switches considered app ropriate wa s us ed to arrive a t the were all com bined. Another study of pressu re final recomm ended values. Som e references were transm itters focusing on a specific manufacturer of of a proprietary nature and, therefore, could neither the electrical type (Carbonado et al., 1991) focuses be referenced n or quoted. Such references were on specific types of failure mechanisms, i.e., loss used as a check on the final results to ensure that of fill oil. Carbonad o and Azarm (1993) uses a the recomm ended uncertainty ranges cover the beta factor of 0.21 for con ditional failure proba bility CCF values reported in these proprietary of at least two pressure transmitters out of a group references.      The rec om m ended va lues are of three. Other studies of pres sure transm itters all provided in the form of the Beta factor for various indica te that these types of com ponents are group sizes. The references that were reviewed typic ally reliable, fully tested infrequently, and there for this appendix (excluding the proprietary is a high potential for dependent failures. Based on references) are given below.
the review of all the materials, Table A-1 provides the reasonable generic data for use as the prior for pressure transmitters.
Table A-1 Generic CCF rates for pressure transmitters used as pressure, level, or flow m onitors Group Size            2 or More                3 or M ore              4 or M ore          Lognormal Error Given 1                  Given 1                  Given 1                  Factor 2                    0.15                      NA                      NA                        6 3                    0.2                      0.1                      NA                        6 4                    0.2                      0.1                      0.1                        6 A-1
 
Appendix A A.2      Sensors: Flux Monitors                                  based on actuarial data of onsite electrical power system in U.S. nuclear power plants. The use of a global error factor is justified since the level of This includes source ra nge m onitors (typic ally redundancy in most cases was 2. Both studies do proportional counters), interm ediate range m onitors not differentiate between different types and (typically compensated ionization chambers), and applications of relays (e.g., mas ter vs. s lave) for fina lly, p o w e r r a ng e m o n i t o rs (typ ica lly CCF rates. Azarm et al. (1994) focuses on the uncompensated ionization chamb ers). Atwood specific relay manufacturer and indirectly provides (1983) and Azarm et al. (1989) were reviewed and a global Beta factor by determining the F factor.
both indicated that CCF rates for such com pon ents In Azarm et al. (1994), (1/F) is the ratio of the are very low. Therefore, it is recom m end ed that a actual system unavailability accounting for global Beta factor of 0.01 with an error factor of 3 independent plus dependent contributions divided be used for these types of flux monitors.
by the indepe nde nt portion. T his study considers that CCFs of the relays are due mainly to slow A.3      Sensors:                Temperature                      acting CC F m echan isms , such as insulation wear-Detectors                                                out and varnish deposition on the relay contacts.
These global Beta factors, therefore, are sensitive Atwood (1983) provides the CCF rate for                            to test intervals; a short test interval will detect resistance temperature detectors. The majority of                  individual failures before becom ing m ultiple failure modes are due either to moisture leakage or                failures. For a test interval of about one ye ar, a high resistance of the resistors. Some drift failures              global Beta factor of about 0.06 for a group size of were also reported.          The reasonable values                2, and a global Beta factor of 0.02 for group sizes provided in Table A-2 are primarily based on the                  of three or m ore is estim ated . It is important to actu al event data reported in Atwo od (19 83) with                note that increasing the test interval by a factor of the exception of error factors which are subje ctively            2 could double the values of the be ta factors ass igned.                                                        estimated. The refore, we re com m end a Be ta factor of 0.06 with an error factor of 2 .2 for a group size of 2 and a Beta facto r of 0.0 2 with an error A.4      Relays                                                  factor of 3 fo r a gro up s ize of three o r m ore w ith earlier adjustment of a test interval if it exceeds A globa l Beta fac tor of 0 .07 is rep orted for rela ys in        one year.
Hassan and Vesely (1 997). Sim ilarly, Martinez-Garret and Azarm (199 4) report a globa l Beta factor of 0.06 with an error facto r of 2.2 for rela ys Table A-2 G ene ric CC F rates for res istanc e tem pera ture d etecto rs excluding the in-core thermocouples Group Size              2 or M ore              3 or M ore            4 or More          Lognormal Error Given 1                  Given 1                Given 1                Factor 2                      0.14                    NA                    NA                      6 3                      0.14                    0.07                  NA                      6 4                      0.2                    0.1                  0.07                    6 A.5      Analog Channel                                          am plifier to feed a device or a relay, or a comparator to provide input to a logic channel.
Solid-state analog circuits have been in use for An analog channel is typically responsible for signal many years, and there is good understanding of conditioning by methods, such as modulation, the ir failure mechanisms. CCF of analog circuits de-modulation, filtering, or amplifying. The last due to heat, humidity, electrical surges, lightening, stage of an analog channel is either a driver A-2
 
Appendix A smok e, and vibration have been observed in the              Azarm , M. A ., et al., Dependent Failures and Two pas t. The CCF rates for analog chann els are                Case Studies, BNL Technical Report W 6082, application dependent; however, Hassan and                    Brookhaven National Laboratory, August 1994.
Ve sely (1997) and Azarm et al. (1989) provide som e generic CCF rates for the analog channels,              Azarm , M . A., et al., Level 1 Internal Event PRA i.e., 0.07 from Hassan and Vesely (1997) and 0.05            for the High Flux Beam Reactor, BNL Technical from Azarm et al. (1989). Prim arily based on these          Re port, Brookhaven National Laboratory, August references, a glob al Beta factor of 0.07 should be          1989.
used for analog channels (regardless of group size). An error factor of 6 is recom m ende d to              Carbonado, J., and M. A. Azarm , Evalua tion of indica te the variation of this g lobal beta facto r with    Surveillance and Technical Issues Regarding the specific application type.                                ATWS Mitigation System s, BNL Tech nical Report L-1311, Brookhaven National Laboratory, June 18, A.6      Digital Channels                                    1993.
Carbonado, J., et al., Evaluation of Surveillance A digital channel could be a programm able logic and Technical Issues Regarding Rosemount module, a logic circuitry, a processor unit with the Pressure Transmitter Loss of Fill-Oil Failures, BNL associated mem ory and bus structure, etc. The Technical Report L-1311, Brookhaven National com pon ents in a digital channel could be m ade Laboratory, December 1991.
using a variety of different semiconductor technologies. The CCF associated with these Hassan, M., and W . E. Vesely, Digital I&C com pon ents are mostly driven by external causes; Systems in Nu clear Power Plants: Risk Screening therefore, they should operate in a controlled of Environmental Stressors and a Comparison of environm ent. A global Beta facto r of 0.001 is Hardw are Unavailability with Existing Analog reported for logic modules in Hassan and Ve sely System, NURE G/CR-6579, November 1997.
(1997). An error factor of 10 to in dic ate the significant variability and uncertainty in this CCF Ma rtinez-G arret, G., and M. A. Azarm ,  Reliability estim ate is re com m end ed.
Assessm ent of Electrica l Pow er Supp ly to Onsite Class 1E Buses at Nuclear Power Plants, BNL A.7      References                                          Technical Report l-2505 , Brookhaven National Laboratory, June 7, 1994.
Atwood, C. L., Com mon-Cause Fault Rates for Instrumentat io n a n d Control Assemblies,                  Stromberg, H. M., et al., Com m on-Ca use Fa ilure NURE G/CR-2771, Idaho Na tion al Engineering                  Da ta Collection and Analysis System , Vols. 1 Laboratory, February 1983.                                    through 6, INE L-94 /006 4, Idaho National Engineering Laboratory, December 1995.
A-3
 
APPENDIX B SIMPLIFIED LEVEL 2 ANALYSIS B.1        Background                                            simplified con tainm ent event tree (CET) and redefinition of the phenom enological portion in term s of a physically based pro bab ilistic In this appendix, the analyses performed as part of framew ork.      Such an approach provides a the Level 2 portion of a probabilistic risk streamlined procedu re for asses sm ent of severe assessm ent (PRA) are described. The analyses accident risks that further allows for a direct described in this appendix were previously evaluation of potential accident managemen t published in an earlier version of this procedure strategies.
guides (NUREG /CR-6572, Vol. 3, Part 1, September 1999). The approach described is a This appendix describes six major procedural simplified Level 2 PRA and is included here for activities for assessment and managem ent of com pleteness. The approach described in the severe accident risks (see Figure B.1).
m ain body of revised procedure guide is a full-Section B.2.1 provides guidance on development sco pe L evel 2 PR A.
of plant dam age states (PDS s) (A ctivity 1). Section B.2.2 discusses the developm ent of a simplified A Level 2 PRA consists of five major parts:
CET (Activity 2).      The determination of the likelih ood of occurrence of severe accident
: 1.        Plant damage states, phenomena leading to various containm ent failure
: 2.        Containment event tree analysis, m odes are also discussed in this section
: 3.        Release categorization (Activity 3). Guidance is provided for determ inistic
: 4.        Source term analysis, analyses including consideration of uncertainties
: 5.        Severe accident management strategies.
for severe accid ent iss ues .        Sec tion B.2.3 discusses the accident progression grouping B.2        Task Activities                                      (source term categori zation, A cti vity 4).
Section B.2.4 provides guidance on an evaluation The purpose of this appendix is to provide a guide              of release and trans port o f radionuclides leading to for assessment and m anagem ent of severe                        an estimation of environmental source terms for acc ident risks in VVER s.                                      each accident progres sion grouping (Activity 5).
Output from Activity 5 provides the information Probabilistic accident progression and source term              needed to perform an offsite consequence analyses (Level 2 PRAs) address the key                          assessment (Level 3 PRA).            Sec tion B.2.5 phenomena and/or processes that can take place                  discusses the develop m ent of pote ntial plant-during the evolution of severe accidents, the                    specific accident managem ent strategies to reduce response of containment to the expected loads,                  the frequency of accident progression groups with and the transport of fission products from dam aged              large-release con cerns (A ctivity 6). Attac hm ent 1 core to the environment. Such analyses provide                  describes the key phenomena and/or processes information about the probabilities of accidental                that can take place during the evolution of a severe radiological releases (sou rce term s). The analyses            accident and that can have an important effect on also indicate th e re lative safety im portance of              the containm ent behavior.
events in terms of the po ssibility of offs ite radiological releases, which provide a basis for                B.2.1 Plant Damage States d e v e lo p m e n t of p lan t-s pe cif ic a c c i d e nt managem ent strategies.                                          The role of in terfaces betw een the syste m analysis (Level 1 PRA) and the containment performance A concern associated with the res ults of L evel 2              analysis is particularly important from two PRAs stems from their known s usc eptibility to                  perspectives. First, the likelihood of co re damage p h e n o m e nolo g i c a l u n c e r ta i n ti e s . These    can be influenced by the status of particular uncertainties are often of such a magnitude that                containment systems .          Second, containment they m ake the decision-m aking proce ss d ifficult.            performance can be influenced by the status of The re is much to be gained, therefore, from                    core cooling systems. Thus, because the assessment of se vere acc ident risks , by reformulation of the Level 2 methodology into a B-1
 
Appendix B Figure B .1 Ma jor proced ural activities for assess me nt and ma nage me nt of severe accident risks influences can flow in both directions between the          than others.              For example, some PDSs will system analysis and the containment performance              com pletely bypass containment, such as accidents analysis, particular attention must be given to these        in which the isolation valves between the high-interfaces.                                                  pressure reactor coolant system (RCS) and the low-pressure secondary systems fail causing a The Level 1 PRA analysis identifies the specific            l o s s -o f - c o o la n t a c c i d e nt (L O C A ) ou tsid e combination of system or component failures (i.e.,          con tainm ent. Other examples include failure of the accident sequen ce cutsets) wh ich can lead to core          steam gen erato r (SG) tubes and loss of damage. The nu m ber o f cuts ets gene rated b y a          conta inmen t isolation. Early loss of containment Level 1 analysis is very large. It is neither practical      integrity can be the re sult of internal initiating nor necessary to assess the severe accident                  events and can also be caused by external progression, containment response, and fission              initia tors (such as seismic events). In past PRAs product release fo r eac h of th ese cuts ets. As a          for some U.S. plants, seismic initiators have been result, the comm on practice is to group the Level 1        important contributors to the frequency of loss of cuts ets into a sufficiently small number of plant          con tainm ent iso lation.
damage states to allow a practical assessm ent and managem ent of severe accident risks.                    For those situatio ns where the contain m ent is initially intact, some PD S groups will cause m ore A PDS sh ou ld be defined in such a way that all            severe containment loads (e.g., elevated pressures accident sequences associated with it can be                and tem pera tures ) than others. Fo r exa m ple, a treated identic ally in the accident progression            transient event with loss of coolant injection and analysis. That is, the PDS definition must              containment heat removal (e.g., failure of recogn ize all distinctions that matter in the accident      containment sprays) will result in a core meltdown progression analysis. It is clear that some PDSs            with the reactor coolant system at high pressure.
will be more challenging to containment integrity            A high-pressure core meltdown has the poten tial to B-2
 
Appendix B cause m ore severe conta inm ent loads than say a              VVER analysts should verify that the attributes LOCA with the containment heat removal systems                given in Table B-1 are appropriate and ask operating. Accidents initiated by seismic events              themselves whether VVERs have som e other also tend to be important contributors to the                  features that also belong on this table. It s hould frequency of the severe PD S groups. T his is                  also be noted that the PDS groups in Ta ble B-1 because seism ic events have the potential to                  assum e that seismic events will not cause any cause multiple equipment failu res and hence re sult          unique containment failure modes but simply in more severe PDS groups.                                    influence the frequency of the more severe PDS groups. If unique failure mod es are identified in the Before PDS s are defined, the analyst must identify            external event PRA, then Table B-1 should be plant conditions, systems, and features that can              expanded accordingly.
have a significant impact on the subsequent course of an accident. All potential combinations of the              B.2.2 Containment Event Tree PDS characteristics that are physically possible are Analysis tabulated and assigned an identifier. The PDS m atrix is usually developed by a Level 2 analyst and then reviewed by a Level 1 analyst for                    The evaluation of accident progression and the co m pa tibilit y with the p l a n t mo d e l and              attendant cha llenges to conta inm ent inte grity is an completeness in the appropriate dependencies.                  essential element of a risk assessm ent. The key The matrix is revised, as necessary, until all                phenomena and/or processes that can take place requ irem ents specified by the Level 1 and Level 2            during the evolution of a severe accident and that ana lysts are deemed satisfactory. For exam ple ,              can have an im portant effe ct o n contain men t the PD S s hould be defined such that it yields a              behavior are described in Attachment 1. The unique set of conditions for entering the                      discussion in Attac hm ent 1 identifies those issues containment event tree. A Level 2 analyst may find            that need to be consid ered whe n attem pting to it necessary or convenient to distinguish amo ng              characterize the progress ion of severe a ccidents groups of scenarios that have been assigned to a              and the potential for various containm ent failure comm on PDS. This might be the case if distinct                modes or bypass mechanism s. Of particular sc enario types have be en a ssigned to a particular          importance is to determine the effectiveness of PDS but su bsequently prove to have different Level            those systems that are relied upon to mitigate the 2 signatures. The past ex perience of the Level 2              consequences of severe a ccidents . Attac hm ent 1 analyst helps to reconcile these issues.                      lists some of the considerations that need to be addressed by the VVER analysts prior to taking All of the plant m ode l inform ation o n the ope rability    credit for a s ystem in the Level 2 PR A. In status of active systems that are important to the            particular, it should be determined whether or not timing and magnitude of the release of radioactive            the equ ipm ent unde r con sideration is qua lified to m ate rials must be passed into the CET via the                operate successfully in the harsh environmental definition of the PDS. Therefore, the plant model              conditions (high temperature, pressure, humidity, event trees mus t also address those active                    ra dio ac tivity, aeroso l c oncentration, etc.)
systems and functions that are im porta nt to                  associated with core m eltd ow n acc ident. The containment isolation, containment heat removal,              discussion in Attachment 1 can be summ arized by and the rem oval of radioactive material from the              using event sequence diagrams such as those containment atmosp here. A containment spray                  sho wn in Figures B.2 a nd B .3.
system is a good example of such a system.
A relatively simple set of PDS attributes is, therefore, proposed in Table B-1 that will identify those acciden ts that are m ore c hallenging to containment integrity than others. The attributes given in T able B-1 allow th e accident sequences generated in the Level 1 analysis for both inte rnal and ex ternal events to be processed through the simplified CET described in Section B.2.2. The B-3
 
Appendix B Table B-1 Plant damage state attributes Initiator Type                    *Large, intermediate, or small LOCAs
                                  *Trans ients
                                  *Bypa ss e vents
                                    -      Interfacing systems LOCA
                                    -      Steam generator tube rupture (SGTR)
Status of Containment at Onset    *Isolated of Core Damage                    *Not isolated Status of Containment Systems    *Sprays (if any) always operate/fail or are available if demanded
                                  *Sprays opera te in injec tion m ode , but fail upon switchover to recirculation cooling Electric Power Status            *Available
                                  *Not available Status of Reactor Core Cooling    *Fails in injection mode System                            *Fails in recirculation mode Heat Removal from the Steam      *Always operate/fail or are available if demanded Gen erators                      *Not operating and not recoverable B-4
 
Appendix B Figure B.2 Event sequence diagram for accidents in which the containment is bypassed or not isolated Figure B.3 Event sequence diagram for accidents in which the containment is initially intact B-5
 
Appendix B First, it is most important to determine the status of      An early release can be caused by several different containm ent prior to core dam age . Thus, the first        failure m echanism s, w hich are discuss ed in event (in both diagrams) after accident initiation is        Attachment 1 and will be explained in m ore deta il to determ ine containment status.              If the      later in this procedure guide. However, for the containment is bypass ed o r not isola ted                  purposes of d eveloping a simple event sequence (Figure B.2 ), then it is inevitable that radionuclides      diagram, it is known that these failure mechanisms will be released to the environm ent after core              are strongly influenced by the pressure in the damage. Therefore, the diagram focuses on those              reactor coolant system and whether or not core events that will influence the magnitude and timing          damage can be terminated by restoring coolant of the release.                                              injection prior to vessel meltthrough. It is also poss ible that the damaged core can be retained in Radionuclides released while the core is in the              the reactor vessel by extern al coo ling if the cavity reactor vessel are term ed in-vessel release.              is flood ed.
accidents (such as interfacing systems LOC A). It is possible that the break location outside of              If the core debris cannot be cooled and retained in containme nt is under water. If the radionuclides            the reactor vessel, the potential exists for pass through such a pool of water, then significant          containment failure at the time of reactor vessel scrubbing or retention of the aerosols can oc cur,        meltthrough. If the contain m ent does not fail which reduces the source term to the e nviron m ent.        early, then the potential exists for late Sim ilarly, for an accident in which the containment        containment failure. In this conte xt, late is is not isolated, conta inm ent sp rays can significantly    defined as several hours to days after the core lower the airborne concentration of radionuclides            m elts throu gh the vesse l. Late failure can occur as w ith a c orres p o n d i n g re d uction in th e            a result of high pressures or temp eratures if active environm enta l source term .                                containment heat rem oval systems are not available. Th ese types of failures are usually It is importa nt to determine if coolant injection can      structural failures and can occur above ground. If be res tored and core m elt arrested in the reactor          the cavity is dry or the core is not coolable, late vessel (as happened in the T hree Mile Island Unit 2        containment failure can occur as a result of the accident) prior to vessel meltthrough. If core              core debris melting through the conc rete b ase m at.
damage is not term inated in-vessel, it is important        Under these circumstances, the release would be to know if the region under the vessel is flooded.          below ground. Of course, if the contain m ent is not A flooded cavity could cool the core debris and              bypassed and does not fail (early or late), then the prevent core-concrete interactions (CCIs) (coolable          release to the environment will be via containment debris bed) and eliminate radionuclide release from          leakage. The VVER analysts should construct this m echan ism (i.e., no ex-vessel release).              event sequence diagram s of the type shown in How ever, if the cavity is dry, extensive CCIs can          Figures B.2 and B.3 th at reflect plant-specific occur res ulting in significant radionuclide rele ase        features that have the potential to influence severe (i.e., ex-ve ssel re lease occurs) an d the possibility      acc ident prog ression.
of basem at m eltth rough. It is also necessary to determine whether or not the flow path from the              The nex t step in the process is to determine the damage core to the environment is flooded or                probabilities of potential containment failure modes affected by spray operation.                                and bypass mechanism s conditional on the occurrence of each plant damage state identified in Alte rnatively, if the containment is isolated and not      Section B.2.1. This step is normally achieved by initially bypassed, the event sequence diagram              using event trees that incorporate events such as (Figure B.3) focuses on identifying when the                those shown in Figures B.2 and B.3 and address containment might fail or be bypassed during the            the issues discussed in Attac hm ent 1. A CET is a cause of a severe a ccident. For clarity, only three        structured fram ework for organizing the different potential release mechanisms are included in the            accident progressions that may evolve from the diagram. An early release is defined as a release            various core damage accident seq uen ces . The top that occurs prior to or shortly after the core debris        events in a CET are developed so that the m elts thro ugh the reacto r vessel.                        likelihood of whether the containment is isolated, bypassed, faile d, or remains intact can be B-6
 
Appendix B determined. CE Ts can vary from rela tively sm all              particular acc ident sequen ces . W hether or not the trees with a few top events developed for each                  systems succe ssfully operate during a se vere plant dam age state gro up to very large and                    accident has to be evaluated (re fer to complex trees that are able to acc om m odate all                Attachment 1) as part of the Level 2 PR A. In plant dam age state s. A n exam ple of a simplified              addition, any operator actions that are in the formal CET is provided in Table B-2.                                    operating procedures for the plant should be included in the P RA . Howe ver, after core damage, This CE T is based on the event sequence                        there are a number of actions that an operator diagram s in Figures B.2 and B.3 and also                        could tak e that c ould term inate and significantly incorporates the issues discussed in Attachment 1.              m itigate the consequences of a core meltdown The top events in the CET are the key attributes for            accident but which are n ot part of the operating a typical U.S. pre ssu rized water reactor with a                procedures. Operator action s of this nature should large-dry con tainm ent. T he V VER analysts should              be included in severe accident managem ent verify the completeness of Table D-2 and                        strategies and should complement the normal plant determine if VVER plants have some other                        operating procedures.          The discussion below features that sh ould be incorporated into the CET.              indicates where opportunities (in Questions 4, 6, 7, 10, 11, and 14) exist for implem enting accident S om e of the CET questions correspond to the                    managem ent strategies.
availability of various systems whereas other questions are relate d to the likelihood of physical            The analyst should first quantify the CET without phenomena leading to containment failure. For                    the benefit of these accident managem ent example, it is initially important to determine if the          strategies. The CE T can be re adily requ antified to containment is isolated or bypassed (Q uestion 1).              assess the impact of any strategy on the likelihood This question can be answered based on                          of containment failure or bypass. Decisions related inform ation c onta ined in the P DS s.                          to implementing accident management strategies should be based on the integrated risk results.
How ever, the likelihood of containment failure                  Section B.2.5 describes some of the considerations (Question 13) de pends on quantifying uncertain                  that must be taken into account when developing phenomena which are, in turn, strongly influenced                thes e stra tegies .
by the pressure (Question 6) in the reactor coolant system during core m eltdown and ves sel failure                The CET also includes several highly complex (refer to the discussion in Attachment 1). In a                  phenomenological issues associated with the similar manner, the issue of de bris bed c oolability            progression of a core meltdown accident. A two-(Question 15)            is  a n o t h e r i m p o r t a nt    step approach is provided to assess the likelihood phenomenological issue that strongly influences                  of various containment failure modes induced by the potential for containm ent failure (Question 16)            these highly com plex severe accident phenomena.
in the late time fram e.                                        As a first s tep , a relatively sim ple scoping analysis should be performed. If, however, the scoping Table B-2 identifies those questions that can be                analysis is inconclusive, then a more detailed quantified from system (and hum an) reliability                  second ste p would be needed. T his second step analyses including consideration of potential                    is de sc rib ed bel ow for som e of t h e s ev er e a c c iden t m an ag em en t str ate gie s            phenomenological questions in the CET.
(Questions 1, 2, 3, 4, 5, 6, 7, 10, 11, and 14) and those that require phenomenological analyses                    Question 1 - Is the containment isolated or not (Questions 8, 9, 12, 13, 15, and 1 6). An approach              bypassed?
for dealing with each question in the CE T is presented below. Quantification of those questions              This question can be answered based on in the CET that deal with system (and hum an)                    information in the PDS. A negative respo nse to reliability analyses are in part based on information            this question includes accidents in which the contained in the PDS groups.                                    containment fails to isolate as w ell as accidents that bypass containment (such as interfacing How ever, the PDS groups only provide information                systems LO CA and SG TR ). This question applies on which systems are poten tially available for B-7
 
Appendix B Table B-2    Nodal questions for a simplified CET Top Event Question                      Prior Dependence                Question Type
: 1. Is the con tainm ent iso lated o r not    None                      Based on PDS bypassed?
: 2. W hat is the status of reactor core        None                      Based on PDS cooling system?
: 3. Is power available?                        None                      Based on PDS
: 4. Are the sprays actuated prior to          3                        Based on PDS and accident reactor vessel meltthrough?                                          managem ent
: 5. Is heat removal from the steam            None                      Based on PDS generators possible?
: 6. Does the reactor coolant system            2, 3, 5                  Based on PDS, design and depressurize?                                                        acc ident m ana gem ent
: 7. Is in-vessel coolant injection            2, 3                      Based on PDS and accident restored?                                                            managem ent
: 8. Does thermally induced steam              6                        Phenomena generator tube rupture o ccur?
: 9. Do es the co ntainm ent fa il prior to    1, 4, 6                  Phenomena reactor vessel meltthrough?
: 10. Is the break location under water for      1, 2, 7                  Based on PDS design and bypass accidents?                                                    accident managem ent
: 11. Is the region under the reactor            2, 4                      Based on PDS, design and vess el flo oded or d ry?                                            accident managem ent
: 12. Is reactor vessel breach prevented?        6, 7, 11                  Phenomena and design
: 13. Does containment fail at vessel            6, 8, 9                  Phenomena breach?
: 14. Do the sprays actuate or continue          3, 4                      Based on PDS and accident to operate after vessel breach?                                      managem ent
: 15. Is th e core debris in a coolable          4, 11                    Phenomena configuration?
: 16. Does containment fail late?                9, 11, 13, 14, 15        Phenomena B-8
 
Appendix B only to accidents in which the conta inm ent fa ils to      strategies involve the use of alternate water supply isolate or is bypassed at or before ac cid ent              systems. Sec tion B.2.5.1 describes some of the initiation. Accident sequences that result in the          con siderations that need to be taken into account containment becoming bypassed (such as induced              when developing accident managem ent strategies SGTR) after core dam age do not apply to th is              related to containment spra y operation. In addition, question. Thes e accidents are included under the          Attachment 1 stresses that it is also nec ess ary to response to Question 8 below.                              carefully assess wheth er or n ot a sys tem will be able to perform the intended function under the Question 2 - W hat is th e statu s of rea ctor core        harsh environm ental conditions of a severe coo lin g syste m ?                                        acc ident.
This question can also be answered based on                Question 5 - Is heat removal from the steam information in the P DS . If the coolant injection          generators possible?
pum p fails in the injection mode, then the con tents of the water s torag e tanks will not be injecte d into    Information contained in the PDS can be used to con tainment (unless the containment spray                  determine if heat removal from the steam operates). For some containment designs, the                generators is possible for each of the accident reactor cavity can only be flooded if the contents of      sequences under consideration. Heat removal the wate r stora ge tanks are injecte d into                from the steam generators is one possible way of con tainm ent. The VV ER analysts s hould ascertain        depressurizing the RCS. Thus, the success of whether or not this is also true for the VVER              som e accident managem ent strateg ies de signed to containment design under consideration. The                dep ressurize the RCS (refer to Question 6 and response to this question influences the response          Section B.2.5 .2 below) are contingent on a po sitive to Question 11 below.                                      response to this question.
Question 3 - Is power available?                            Question 6 - Does the reactor coolant system depressurize?
This question is answered from information in the PDS. The status of powe r availability is important        For accidents initiated by transients a nd sm all for determining whether or not certain actions can          break LO CA, the RC S w ill remain at high pressure be undertake n during the cours e of th e ac cident.        unless the operators depressurize the RCS or For example, spray system operation requires                induced failure of the RC S press ure bound ary power (unless a dedicated powe r supply is                  occurs (thermally induced SGTR is addressed provided) so that the response to this question            under Question 8 below ). For accidents initiated by directly influences the response to Questions 4 and        interm ediate and large break LO CA, the RC S w ill
: 14. Power is also needed to depressurize the RCS            dep ressurize and be at low pressure prior to core (Question 6) and restore in-vessel coolant injection        damage. Thus, information in the P DS related to (Que stion 7).                                              the initiator type (i.e., a transient event or a small break LOCA versus a large or an interm ediate Question 4 - Are the sprays ac tuated p rior to            LO CA ) can be used to answer this que stion.
reactor vessel meltthrough?
How ever, it is generally recognized that if the RCS This question can be answered in part based on              remains at high pre ss ure (i.e., transients a nd sm all information in the PDS but can also be influenced          break LOC As) during a c ore m eltdow n ac cident, by potential accident management strategies.                the challenges to containment integrity will be m ore Containment sprays can be autom atic ally actuated          severe than for low-pressure sequences.
based on a high contain m ent pressure signal.              Consequently, various accident management Under these circumstances and if po we r is                strategies have be en p ropo sed to depressurize the available, the spray system would be actuated              RCS for those accidents that wou ld otherwise be early in the accident. However, it has been                characterized as high RC S press ure sequences.
suggested that delaying spray operation to later            Depressurization can potentially be achieved by times may be more beneficial from an accident              heat rem oval through the steam generators mana gement perspective.            Other potential        (positive res ponse to Questio n 5) or by direct B-9
 
Appendix B pressure relief of the RCS. Again, the ability of          This question deals with the like lihood of a these systems to adequately depressurize the RCS            hydrogen combu stion event failing the containment during severe accident conditions needs to be              prior to vessel failure. In order to determine the ca re fu lly ev alu a t ed . H o w ever, prior to        likelihood of failure, the magnitude of the pressure implementing RCS depressurization strateg ies, a            rise caused by a hydrogen combustion event has number of advers e effects need to be considered            to be com pare d ag ainst the ultim ate capa city of the as indicated in Section B.2.5.2.                            con tainm ent.      The ultimate capacity of the containment is usu ally a facto r of 2.5 to 3 times the Question 7 - Is in-vessel coolant injection                design pre ss ure. In a separate pro jec t, the N RC is restored?                                                  sponsoring res earch at the Ru ss ian Ac adem y of Sciences in which a finite element model of the This question can be answered based on                      Ka linin contain m ent is being developed. T his information in the P DS . At a minimum , power and          model will be us ed to pred ict the response of the water must be available in order to restore                containment structure to pressure loads in order to injection. In addition, for some accidents, the RCS        determine the ultimate pressure capacity. The must be depressurized (if only low head injection          results of this activity can be used to help qua ntify pumps are available) in order to restore coolant            the CET for the Kalinin plant. It should be noted injection. Injecting water into a damaged reactor          that in order to quantify the CET , a fragility curve core is done to terminate core meltdown and                (i.e., a probability of failure versus pressure curve) establish a coolable geom etry. Several accident            is needed.      Developing these fragility curves managem ent strategies have been proposed for              require engineering judgment and information injecting water into the RCS (refer to                      obtained from the finite element analysis and other Section B.2.5.3).                                          sou rces. Ex am ples of ho w fragility curves can be developed are given in Breeding et al. (1990) which Question 8 - Does thermally induced steam                  describes how an expert panel addressed gen erato r tube ruptu re occur?                            structural response issues.
The like lihood of a temperature-induced creep              T he magnitude of the pressure loads caused by rupture of the SG tubes depe nds on s everal factors        combustion events can be determined by a number including the therm al-hydraulic conditions at              of approaches. As a first step, the amount of various locatio ns in the primary and s econd ary          hydrogen generated during in-vessel core systems, which determine the temperatures and              meltdown can be estimated. The pressure rise the pressures to which the SG tubes are subjected          from the combustion of this hydrogen can then be as the accident progress es. Other relevant factors        calculated by assuming adiabatic energy transfer to include the effective temperature required for creep        the conta inm ent atmosphere. If the containment rupture failure of the SG tubes and the presence of        can withstand this bounding adiabatic pressure defects in the SG tubes which increase the                  load, then no further analysis for this potential likelihood of rupture.                                      failure mode is needed and the conditional prob ability of containm ent failure via this Therm ally induced SGTRs can occur after the SGs            mech anism prio r to rea cto r vess el m eltth rough is have dried out and very hot gas is circulating. The        zero. How ever, if the adiabatic load is close to or horizontal SG design in VV ER s m ost like ly              exceeds the containment capacity, then a m ore precludes counter-current natural circulation flow in      detailed analysis of this failure mechanism is the hot leg. However, the possibility of water seal        nee ded .
clearing at the bottom of the downcomer and at the cold leg loop seals is a pote ntia lly important issue      The extent of containment loading due to hydrogen for therm ally induced failure of the SGs and should        combustion is largely a function of the rate and be studied for VVERs.                                      magnitude of hydrogen production and the na ture of the com bus tion of this hydroge n. Uncertainties Question 9 - Do es th e co nta inm ent fail prior to        associated with hydrogen loading arise from an reactor vessel meltthrough?                                incom plete state of understanding of various phenomena associated with hydrogen generation and combustion. These phenomena include in-B-10
 
Appendix B vessel hydrogen gene ration, hydrogen transp ort              Experimental studies of hydrogen combustion have and mixing, hydrogen deflagration, hydrogen                  been performed to understand the combustion detonation, and diffusion flames.                            behavior under expected plant conditions, and there is a reasonably complete database at several The issue regarding in-vessel hydrogen generation            scales for ignition limits, combustion completeness, centers on the rate and quantity of hydrogen                  flame speed, and burn pressure for a hydrogen-production and the associated hydrogen-steam                  steam-air mixture.
mass and energy release rates from the RCS.
These parameters strongly influen ce th e                    Improved correlations for flame speed and flam m ability of the bre ak flow, the containment            combustion completeness have been derived by atmosphere, and the magnitude, timing, and                    W ong (1987). These correlations were derived location of potential hydrogen combustion.                    based on the com bustion data from the Variable Geo m etry Experim ental S ystem (Benedick, The degree of m ixin g and rate of transport of              Cum mings, and Prassinos, 1982 and 1984); Fu lly hydrogen in the containment building is an                    Instrumental Test Se ries (Marshall, 1986); Nevada important factor in determ inin g the mode of                Test Site (T hom son , 1988); Acurex (To rok et al.,
com bus tion. Hydrogen gas released during an                1983); and W hiteshell (Kumar, Tamm , and accident can stratify, particularly in the absence of        Ha rrison et al., 198 4) ex perim ents .
forced circulation and if there are significant temperature gradients in the co ntainm ent.                  A physically based probabilistic framework like Hydrogen released with steam can also form                    ROAAM (Theo fanous , 1994) ca n be use d to locally high concentrations in the presence of                determine the uncertainty distribution for the peak condensing surfaces.        Should the hydrogen              pressure in the containment due to hydrogen acc um ulate in a locally high concentration, then            combustion. The quasi-static loads from hydrogen flame acceleratio n and deton atio n could occur.            combustion can be obta ined by an adiabatic Hydrogen mixing and distribution in a containment            isochoric complete combustion model and then be is sensitive to the hydrogen injection rate and the          corrected to account for burn completeness and availability of forced circulation or induced                expansion into nonparticipating compartments.
turbulence in the containment. The results of                The un ce rta inty distribution for hydrogen large-scale hydrogen com bus tion tes ts performed            concentration and ignition frequencies should be at the Nevada Test Site appear to qualitita tively            used in the quantification of the pressure suppo rt the notion that operating the spray system          distribution for com parison with th e ultim ate will result in a well-mixed atmosphere (Thom son,            pres sure ca pab ility of the con tainm ent.
198 8).
Question 10 - Is the break location under water Hydrogen deflagrations involve the fast reaction of          for bypass accidents?
hydrogen through the propagation of a burnin g zone or com bustion wave after ignition. The                  Core damage accident sequences that bypass combustion wave travels subsonically and the                  containment (such as interfacing system s LOCA) pressure loads developed are, for practical                  usually result in significant fission product release purposes, static loads. Deflagrations are the most            to the environm ent.            The relatively high like ly mode of com bustion during degraded core              environmental release for these acc idents occurs accidents. In fact, the deflagration of a premixed            because the release path bypasses attenuation atmosphere of hydrogen-air-steam occurred during              m echanism s (such as sprays or wa ter pools) that the Th ree M ile Island Unit 2 accident. The                  wo uld otherwise be available to reduce the source likelihood and nature of deflagration in                      term. A possible accident management strategy containm ents is strongly influenced by several              for containment bypass accidents is to flood the param ete rs--nam ely, composition requirement for            break location outside of containm ent (re fer to ignit ion, av aila bilit y o f i g n it io n s o u rces,      Section B.2.5.4) for those cases that would completeness of bu rn, flame speed, and                      otherwise not be flooded.
propagation between compartments. In addition, combustion behavior is influenced by the effec ts of operating sprays.
B-11
 
Appendix B Question 11 - Is the region under the reactor                  prob ability of successful arrest was assumed to be vess el flooded or dry?                                        1.0. A sim ilar tim e frame appropriate for VVERs, based on core heatup characteristics and the This question can be answered by reference to the              potential for core coolability, s hould be developed.
PD S. For example, in some containment designs if the water in th e water storage tanks is injected          The likelihoo d of p reve nting vess el breach by cavity into containment, then the reactor cavity will be              flooding dep end s on several fa ctors , such as the flooded (i.e., a failure in the rec irculation m ode in        pressure in the primary system, the configuration of Question 2).      However, in other containment                the cavity, the extent of submergence of the designs, accident managem ent strategies are                  reactor vessel, and easy access of water to the needed to ensure that sufficient water is injected            bottom of the reactor vessel. Under high RCS into conta inm ent in order to flood the re actor cavity.      pressure circumstances, due to pressure and thermal loading, it is like ly that vessel breach Flooding the reactor cavity can be beneficial during          cannot be prevented by cavity flooding.
a core meltdown accident in two re spe cts. F irst, a flooded cavity would externally cool the reactor              Under low RCS pressure circum stances, the vessel and (for some reactor designs) could                    likelihood of preventing vessel breach by external prevent the core debris from m elting through the              flooding can be evaluated by determining the bottom vessel head. This would prevent ex-vessel              thermal load distribution on the inside boundary of core debris interactions and the environmental                the lower head, the critical heat flux limitation on consequences of the accident would be                          the outside boundary of the lower head (which is significantly redu ced . Second , even if the core            affected by the insulation) and the structural debris doe s m eltthrou gh the vesse l head , it could        integrity of the lower head, when subjected to static be cooled by the water in the cavity and if a                  and dynam ic loads (i.e., fuel-coolant interactions).
coolable debris bed is formed, the potential for              Detailed discussions and application of ROAAM to core-concrete interactions would be eliminated.                this issue for the Loviisa Nuclear Plant (VVER-440)
Although a flooded cavity has obvious advantages,              in Finland and an advanced U.S. light water reactor som e of the poten tial adverse effects d iscussed in          (AP600) design can be found elsew here (Tu om isto Section B.2.5.1 need to be con sidered before                  and Theofanous, 1994; and T heo fanous et al.,
implementing containment flooding strategies.                  1995). Some ideas to enhance the assessment basis as well as performance in this respect for Question 12        -  Is  reactor    vessel    breach        application to larger and/o r higher po wer den sity prevented?                                                    reactors are also provided by T heofanous et al.
(1995).
This question deals with the likelihood of preventing vessel breach by retaining the core                Question 13 - Does containment fail at vessel debris in the re acto r vessel.        T his could be          breach?
achieved in two ways--namely, by restoration of an in-vessel coo lant injec tion (po sitive res pon se to        The likelihoo d of c onta inment failure at vessel Question 7) or by externally cooling the lower head            breach depends on several factors, such as the of the vessel (positive response to Q uestion 11).            pressure in the primary system, the amount and tem perature of the core debris exiting the vessel, Accidents in which in-vessel coolant is restored              the size of the hole in the vessel, the amount of with in a certain tim e fram e after the start of core        water in the cavity, the configuratio n of the cavity, damage can arrest the accident progression                    and the structural capability of the containment without vessel breach.          For these accidents,          building. Atta chm ent 1 iden tifies the pre ssure in subsequent questions related to containment                    the RC S as the m ost im porta nt consideration for failure at vessel breach are not pertinent. For a              assessing the likelihood of containment failure at typical U.S. pressurized water reactor design,                vessel breach. Therefore, this question depends credit for in-vessel arresting of the accidents has            hea vily on the re spo nse to Ques tion 6.
been given for cases where water flow is restored with in 30 minutes of the onset of the core damage.            Low-Pressure Sequences If cooling is restored within 30 minutes, the B-12
 
Appendix B Under low R CS pres sure circum stan ces , various            its sup plem ent (P ilch, Yan , and Th eofano us, 1994).
m echanisms could challenge conta inm ent inte grity.          The basic understanding upon which the approach These include rapid steam generation caused by                to quantification of DCH loads is based is that core debris contacting water in the cavity and                interm ediate com partm ents trap m ost of the debris hydrogen combustion. Again, scoping calculations              dispersed from the reactor cavity and that the can be performed to calculate bounding estimates              thermal-chemical interactions during this dispersal of the pressure loads under these circumstances.              process are limited by the incoherence in the These bounding pressure loads can be compared                  steam blowdown and m elt entrainment processes.
to the capacity of the contain m ent b uilding to              W ith this un ders tand ing, it is pos sible to reduce determine the like lihood of failure. However, it is          most of the complexity of the DCH phe nom ena to unlike ly that these bounding press ure loads w ill            a single parameter:          the ratio of the m elt exceed the ultim ate capac ity of the Kalinin                  entrainment time constant to the system blowdown con tainm ent. The probability of containm ent failure        tim e constan t wh ich is referred to as the coherence conditional on a low-pressure accident sequence                ratio.
is, therefore, expected to be relatively low (approxim ate ly 0.01) and driven by rem ote events,          DCH loads also depend on parameters that such as energetic fuel-coolant interactions of                cha racterize the system initial conditions, prima ry sufficient magnitude to project missiles through the          system pressure, temperature and composition containment structure. A recent report (Basu and              (i.e., hydrogen m ole fraction), melt quantity and Ginsberg, 1996) of a steam explosion review group              composition (i.e., zirconiu m and stainless steel pres ents an updated assessment of the likelihood              mass fraction), and initial containme nt pressure of an in-vessel steam explosion causing                        and compos ition. The key component of the containment failure. This report can be used as a              framework, therefore, is the causal relations basis for quantifying the CET.                                between these parameters and the resulting containment pressure (and temperature). Of these High-Pressure Sequences                                        parameters, some are fixed, some vary over a narrow range, and som e are so uncertain that they The most important failure mechanisms for high-                can be approached only in a very bounding sense.
pressure core meltdown sequences are associated                Plant-specific ana lyses s hou ld be p erform ed to with high-pres sure m elt ejec tion. Ejection of the          quantify the probability density functions for the core debris at high pressure c an caus e the core              initial melt parameters.          However, sequence debris to form fine particles that can directly heat          uncertainties can be enveloped by a small number the containment atmosphere (i.e., direct                      of splinter scenarios without assignment of containment heating [DCH]) and cause rapid                    probability. These distribution functions, combined pressure spike s.        D uring high-pressure m elt          with a tw o-cell equilibrium m ode l for containm ent, ejection, the hot particles could also ignite any              can be used to obta in a probability density function com bustib le gases in containment, thereby adding            for the peak containment pressure.
to the pressure pu lse. T he p oten tial for DCH to cause containment failure depends on several                  The resulting distribution for peak containment factors, such as the primary system pressure, the              pressure is then com bined with fragility curves size of the ope ning in the vessel, the temp erature          (probabilistica lly distributed them selves) for the and composition of the core debris exiting the                containment structure to obtain a prob ability vess el, the amount of water in the cavity, and the            distribution of the failure frequ enc y (Pilch et al.,
dispersive cha racteristics of the rea cto r cavity.          1996). NUREG /CR-6338 (Pilch et al., 1996)
Sim ple bounding ca lculations for high-press ure              provides further discussion on how th e sequences are unlikely to be conclusive (i.e., they            methodolo gy and scenarios described in (Pilch, will alm ost c ertainly exce ed the ultim ate capa bility      Yan, and T heofano us, 1994) we re used to address of the containment). Therefore, a more detailed                the DCH issue for 34 W esting hou se p lants w ith ana lysis of this failure m ech anism is nee ded .            large volume containments. This report could be helpful for extrapolating the approach to a VVER Discussions on application of ROAAM to this issue              con tainm ent.
is reported in The Probability of Containment Failure by Direct Containment Heating in Zion, and B-13
 
Appendix B Question 14 - Do the sprays actuate or continue                Formation of a coolable debris bed depends on to operate after vessel breach?                                several facto rs, su ch a s the m ode of co ntact between the core d ebris and wate r, the size This question depends in part on the info rm atio n in        distribution of the core debris particles, the depth of the PD S but is also influenced by accident                    the debris bed, and the water pool. As a general managem ent considerations. For some accident                  rule, unless the debris bed is calculated to be thin, sequences, powe r is a vailable and the sprays w ill          both a coolable and noncoolable configuration continue to operate during recirculation. In other            should be considered for the purposes of CET accident sequences, power will be restored and                quantification.
accident m anagem ent strateg ies are ne ede d to ensure the spray operation is restored in an                  Question 16 - Does containment fail late?
app ropriate man ner. Section B.2.5.1 provides guidance on developing accident managem ent                    This question deals with the likelihood of strategies for spray operation.                                containment failure long after vessel breach. The likelihood and timing of the late containmen t failure Question 15 - Is the core de bris in a coo lable              depends on the presenc e of w ater in th e ca vity configuration?                                                (response to Question 11 ), core deb ris coolability (response to Question 15), and the availability of This question addresses the likeliho od o f coo lability      containment hea t rem oval system s (respo nse to of the core debris released into the rea cto r cavity.        Question 14). Each possible combination of Co olability of the core debris requires that the              responses is discussed below.
cavity region under the vessel be flooded (response to Question 11) and that the m olten core            Dry Cavity m ate rials are fragm ente d into particles of sufficient size to form a coolable configuration. Debris bed              If the cavity is dry, the core debris will in general coo lability is an important issue because if the              not be coolable and Q uestion 15 is irrelevant.
debris form s a coolable geom etry, the only source            Extensive CCI will occ ur and noncondensible for containment pressurization will be the                    gases, steam and rad ionuclides w ill be re leased to generation of steam from boiloff of the overlying              con tainm ent. Containment pressurization rates water. Un der these circum sta nces, if containment            can be obtain ed by sim plified energy balance heat removal systems are available, then late                  calculations assuming bounding values.              In containment failure would be pre vente d. E ven in            addition, combustible gases (H 2 and CO) will also the abs enc e of c onta inm ent heat rem oval,                be released during CC I and could re sult in pressurization from water boiloff is a rela tively slow        combustion events. The impact of combustion can process and would res ult in very late containment            be evaluated in a m anner similar to the approach failure allowing time for remedial actions.                    discussed in Question 9.          Furthermore, the Furthermore, a coolable debris geom etry would                likelihood of basemat penetration resulting from lim it penetration of the core debris into the basemat        CCI should also be evaluated fo r the dry cavity and thus prevent this potential failure mode. This,            case. The projected consequences of basem at in turn, limits CCIs and prevents radionuclide                meltthrough are, however, relatively minor releases from the core debris (i.e., no ex-vessel              compared with an above-ground failure of the fission product release).                                      containment that might be caused earlier by a combustion event or high-pressure loads.
The re is, how ever, a significant like lihood that, even if a wate r supply is available, the core debris          Floo ded Cavity will not be coolable and, th erefore, w ill attack the con crete basem at. Under these circumstances,                If the cavity is flooded , then the respo nse to noncondensible gases would be re leased in                    Question 15 (core debris coolability) is very addition to steam and add to containment                      important to CE T q uan tification. Each possibility is pressurization. Also, if significant CCI occurs, the          discussed below.
core debris could penetrate the basemat (depending on the thickness of the concrete) and              Core debris coolable. If the core debris is coolable, ex-vesse l radionuclide release will occur.                    CCI does not occur and all of the decay heat goes B-14
 
Appendix B into boiling water. If the containment heat removal          B.2.4 Source Term Analysis systems are operating, then late containment failure by overpress urization will be prevented.
Also penetration of the basem at by the core debris          The m agnitude and co m position of radioactive will be prevented. If the containment heat removal            m ate rials rele ased to th e environmen t and the systems are not operating, then con tainmen t failure        associated energy content, time, release elevation, will eventua lly occur un less rem edial actions are          and duration of release are collectively termed the taken.                                                        source term. The source term analysis tracks the release and transport of the ra dioactive m ate rials Core debris uncoo lable. If the core debris is not            from the core, through the RCS, then to the coolable, CCI will occur and the impact of                    containment and other buildings, and finally into the noncondensible and com bustion gases will have to            environm ent.      The removal and retention of be taken into account for CE T q uan tification. In          radioactive materials by natural processes, such as addition, the potential for basemat m eltthrough will        deposition on surface s, and by engineered s afety also have to be assessed.                                    systems, such as sprays, are accounted for in each location.
B.2.3 Release Categorization                                  For the analysis of source term s, a sim ple param etric app roac h is recom m end ed s imilar to The CET analysis generates conditional                        that used in NUREG/CR-5747 (Nourbakhsh, 1993).
probabilities for a large n um ber o f end states (i.e.,      This method describes source terms as the potential ways in which rad ioactivity could be              product of release fractions and transmission released to the environment). Some of these end              factors at succe ssive stages in the accident states are either identical or similar, in terms of key      progression. The parameters entering this source radionuclide release characteristics. These end              term form ulation can be derived from existing states are, therefore, grouped to a smaller number            databases supplem ented by a few plant-specific of release categories.                                        code calculations (e.g., using the MELCOR code).
Using the resulting sim plified form ulation, a set of These release categories, which are often referred            source terms that will have a one-to-one to as release bins or so urce term bins, should be            correspondence with each of the source term defined on the basis of appropriate attributes that          categories (see Section B.2.3) can be obtained.
affect radiologica l releas es a nd p otentia l offsite consequences. These attributes are plant s pecific            B.2.5 Development of Severe but should include:
Accident Management
* timing and size of conta inment failure or                    Strategies bypass
* operation of s prays (if operating what is          Severe accident managem ent strategies consist of the spray duration time)                            those actions that are taken during the course of
* whether or not the core debris is flo oded (if      an acc ident to prevent core dam age , term inate flooded is a coolable debris bed formed)            core dam age prog ression (and retain the core
* whe ther or not the RCS is depressurized            with in the vessel), maintain conta inm ent inte grity, prior to vessel breach                              and minimize offsite releases. Severe accident
* whether or not vessel breach is prevented          managem ent strategies also involve preplanning (if vessel breach is prevented, ex-vessel          and pre paratory m easures for severe accident release is also prevented)                          management guidance and procedures, equipment
* whether or not the break location is above          and design modifications, and severe accident or below ground level                              managem ent training.
* whether or not the break location is under water for bypass events.                            The assessm ent m eth odology discussed in Sections B.2 .1 th rough B.2.5 pro vides a basis for the developm ent and e valua tion of potential plant-specific accident managem ent strategies. The integrated results of procedural activities 1 to 5 B-15
 
Appendix B (Figure B.2) will be a set of accident progression          Development report entitled, Implementing Severe groups (release categories) with corresponding              Accident Ma nag em ent in N uclear Powe r Plan ts, frequency and radionuclide release characteristics          (OEC D, 1996).
(source term). Potential accident managem ent strategies can then be developed to reduce the              B.2.5.1 Spray o r Injection of W ater into frequency of (or eliminate) accident progression                      Containment groups with large release concerns.
The use of the spray system or other means to All accident recovery/managem ent action s should            inject water into conta inm ent is a potential severe rem ain consistent between the Level 1 PRA and              accident m ana gem ent strateg y (Qu estion s 4, 1 1, the CET analyses. The recovery actions prior to              and 14) for all three tim e fram es considered in the initiation of core dam age (prevention strategies)          CET in Section B.2.2. Containment sprays can should be credited in the Level 1 PRA, while any            have a number of beneficial effects on severe actions beyond the initiation of co re da m age (pos t-      accident prog ression. There a re, ho wev er, a core damage accident mitigation) should be                  number of potentially adverse effects, which should evaluated as a part of the Level 2 PRA                      be considered before implementing a containment ass ess m ent.                                              spray strategy at a particular plant. The pros and cons associated with spray operation during a The sim plifie d contain m ent event tree discussed in      severe accident are described below for each Section B.2.2 (refer to Table B-2) identified a              pote ntial strategy.
number of opportunities for implem enting accident managem ent strategies. The severe accident                  Co ntrolling Containm ent Atm osp here managem ent strategies identified are:
Containment sprays can be used to cool and
* spray or injection of water into containment      depress urize the containment atmosphere and (Questions 4, 11, and 14)                          thus prevent overpressure failure o f the
* RCS depressurization (Question 6)                  containme nt. Sprays can also remove fission
* in-vessel water addition to a degraded            prod ucts from the containment atmo sphere so that core (Question 7)                                  if containm ent integrity is lost, the environmental
* flooding the break location for bypass            source term will be lower than it would otherwise events (Q uestion 10).                            have be en w ithout the effect of sprays.
Careful evaluation of the feasibility and the relative      A potential adverse effect of restoring containment advantages and disadvantages of each of these                spray operation during the later stages of an accident managem ent strategies is nee ded prior to          accident is the deinerting of a previously steam-their implementation at any specific plant. Plant            inerted atmosphere. This could produce conditions layout and geometry, the capacity and redundancy            that wou ld allow c om bus tion of a large quantity of of emergency p lant s yste m s, a s w ell as specific        hydrogen. Cons equently, any strategy to restore balance of plant fea tures , can determ ine wheth er        containment spray operation late in an accident a particular strategy is feasible or mak es sense            sequence should consider the impact of hydrogen under a certain accident scena rio at a particular          combustion.
plant.      For instance, containm ent pressure capability, areas for debris spreading, size of              External Cooling of the Reactor Vessel sumps, elevation of the reactor vessel, reactor cavity geometry and elevation, water storage tank            In some containments, external flooding of the capacities, flow ra tes of safety and non safety            reactor vessel is fe asible if sufficient water is injection systems, and number of equipment trains            injected into containmen t. This would provide an are only a few of the items which will influence the        external heat sink for the rea cto r vess el and could decisions to be made at a specific site with regard          reduce the boiloff of the in-vessel coolant. In many to severe a ccident m ana gem ent. For further              designs, the vessel lower head could be protected discussions on the results of severe accident                via external flooding, and this external cooling managem ent research and im plementation, refer              could prevent or delay vessel failure.            By to the Organization for Economic Co-operation and            preventing the core debris from melting through the B-16
 
Appendix B vessel lower head, this accident management                B.2.5.2 R eactor C oolant S ystem strategy would eliminate ex-vessel interactions                          Depressurization between the core and water and/or concrete.
RCS depressurization (Question 6 in the CET) can A potential adverse effect ass ociate d with th is          be accomplished via relief valves or via heat strategy is that if vessel failure does occur, then        removal through the SG s. Regardless of the accumulated water could interact with the molten            method used, RCS depressurization provides core deb ris. Th ese fuel-c oolant interactions are        many positive re sponses to severe accidents but like ly to be accompanied by rapid steam generation        may also involve some undesirable effects.
and additional hydrogen pro duc tion. W hile these interactions could be energetic, they are unlike ly to      RCS depressurization increases the opportunity for threaten containment integrity. Nevertheless, the          injecting water into the RCS from a number of low impact of fuel-coolant interactions should be              pressure sources. These include the designed considered prior to implementing a containment              low-pressu re safety injection systems, accum ulator flooding strate gy.                                        tanks, and other, unconventional sources, such as fire water systems. Bes ides providing oppo rtunity Flo od ing Ex-Vesse l Co re D ebris                        f o r a d d i ti o n a l i n je c t io n s o u r c e s , R C S depressurization reduces the stress on the en tire In some designs, adding or redistributing w ater to        RCS and thus reduces the likelihood of the containment prior to vessel failure could protect      unintentional failure of this fission product barrier against conta inm ent failure by such mechanisms            in c l u d in g c o n t a in i n g b yp as s v ia S G TR .
as direct a ttac k o f the contain m ent boundary or        Depressurization will also reduce the natural containment pen etrations. If water is added after          circulation flows in the reactor pressure vessel and vessel failu re and debris ejection, it can, depending      steam generators tubes, thereby reducing thermal on the design, provide a heat s ink for the debris          loads in both com pon ents . Depressurization also and a water pool to scrub fission products.                decreases the driving potential for high-pressure m elt eje ctio n if the core debris eventu ally m elts A potential adverse effect of this strategy is the          through the vessel head.
steam pro ductio n re sulting from the interaction of sprayed or injected wate r with core debris. This          On the negative side, depressurization through the interaction can be substantial depending on the            relief valves w ill increase the rate at which water flow rate and the relative timing of water            hydrogen is discharged into the containment and addition and debris addition into the con tainm ent.        could, depending on the depressurization rate, The amount of steam generated by molten core                increase core oxidation and degradation. Als o, if debris entering a water pool depends on poo l depth        the RCS pressure is reduced, the potential for and whether or not the debris is quenched. The              triggering energeti c in-vessel fuel-coolant threat posed by steam production to containment            interactions is increased, but it is considered integ rity will very m uch depend on the previously        unlike ly that such energetic interactions would fa il existing containm ent pressure and on the status of        the rea cto r pressure vess el.
containment heat rem oval m echanism s.            In addition, if external water sources are sprayed or          Depress urization via the re lief valves would injected into the conta inm ent, wate r could              increase the flow of fission products into the acc um ulate and may lead to flooding of vital              containment and reduce the time available for containment areas reducing or eliminating                  deposition of fiss ion produ cts in th e RCS . For a containment heat rem oval or the press ure                  c o n t a in m e n t w i th a n is o l a ti o n f a i lu r e ,
sup pres sion func tion in so m e co ntainm ents .          depressurization of the RCS would increase containment pressure and lead to larger flows through the isolatio n breach. For a bypassed con tainm ent, R CS depressurization would decrease the flow through the bypass failure.
If RCS depressurization is accomplished via steam generator heat removal, then special consideration B-17
 
Appendix B must be given to prote ct steam gen erato r tube              generated, and embrittled fuel and cladding could integrity. RCS pressurization will tend to increase          be shattered. At very small rates of water addition, the pressure difference across the steam generator            quenching may not be achieved and substantial tubes and, therefore, could lead to a tube failure or        hydrogen could be generated with accident increase an alre ady existin g leak .          This is        prog ression being acc elerated.
especially true after core melt has occurred and the SG tubes are at high temperature. Also, since SG              For a badly damaged core, which is still within the depressurization will increase the heat transfer in          RCS, similar consideration to those above would the tubes, hydrogen may concentrate there and                also apply. However, whether even large water im pair the heat transfer process and limit the              flow rates can quench the core debris will depend amount of RC S depres surization achievable .                on the specific geometry of the reconfigured debris.
Injection of water into the secondary side of the            Furthermore, if there is a compact debris bed, its steam generators would be expected to occur as                poro sity and, therefore, its coolability may be they depressurize. This would further increase the            reduced by the eventual distillation of the boron or heat transfer from the primary to the second ary              other m aterials in the water.
side and enhance RCS depressurization.
How ever, injection of cold water on the s econd ary          After the core debris has melted through the side would increase the thermal stresses on the              reactor vessel, water injecte d in-ve ss el would help SG tubes and could lead to rupture and                        to m inim ize fission product revaporization and cool containment bypass. Ob vious ly, this possibility            debris remaining in the vessel. In addition, water decreases at higher water temperatures and lower              flowing out of the break in the lower vessel head flow rates. In addition, the presence of water on            wo uld help to cool debris in the reactor cavity and the second ary side would scrub fission products              perhaps reduce containment gas temperatures. In which have leaked from the primary to the                    the long term, this water could quench the debris secondary side.                                              and arrest CCI. Again, whether the ex-vessel debris would be quenched depends on the flow B.2.5.3 In-Vessel Water Addition to a                        rate of the water and the configuration of the Deg rade d C ore                                    debris. W ater w ould also h elp to scrub volatile and nonvolatile fission products released from the fue l.
W ater addition to a degraded core may cool the core deb ris and lead to a safe, stable state. The consensus of the reacto r safety comm unity is that even if there are indications of a damaged reactor core, water should be injected when it becomes available. However, there may be a num ber of undesirable effects accompanying this action that plant personnel should be aware of and prepared for beforehand.        These effects include the generation of steam as well as hydrogen plus the pos sibility of the core materials returning to a critical sta te. T he succ essful term ination of the accident as well as the extent and relative importance of the related phenomena depend on the timing and rate of the water addition and whether the water source is borated or unborated.
During the early stages of core damage, large am oun ts of water would rapidly quench the overheated core . Some steam would be produced but wou ld be u nlikely to substan tially pressurize the RCS or produce large amounts of hydrogen.
Sm aller rates of water addition would lead to a slower quenching, additional hydrogen would be B-18
 
Appendix B W ater addition to the ex-vessel core debris also                  description of information used to develop has im plicatio ns for conta inmen t inte grity.                  containment systems analysis models and link Depending on the water flow rate, significant                      them with other system reliability m odels. This steam generation and consequent containment                        documentation should be prepared in the sam e pressurization can result. Additional hydrogen                    manner as that generate d in the Level 1 analysis generation within containment can take place.                      of other systems.
Continued injection into the containment from outside (i.e., not normal emergency cooling                        Docum entation of analyses of severe accident system sources) m ay lead to flooding of                          progression should include the following:
containment areas wh ere critical equipment resides. The fac t that different water flow rates
* a description of plant-specific accident can lead to a decrease (because of quenching and                            simulation m odels including extensive termination of steam generation) or increase                                references to source documentation for (because of steam, hydrogen production, and gas                            input data, space com pression) in containm ent pressure has particular significance for an unisolated or
* a listing of all computer code calculations bypasse d co ntainm ent.                                                    performed and use d as a bas is for quantifying any event in the containment B.2.5.4 Floo ding the B reak L oca tion fo r                                probabilistic logic model including a Bypa ss Ev ents                                                  unique calculation identifier or n am e, a description of key modeling assumptions This severe accident m anagem ent ac tion is aimed                          or input data used, and a reference to at providing fission product scrubbing. A water                            documentation of calculated results. (If source, such as servic e wate r, could be used if the                      input and/or output data are archived for break location can be identified and a connection                          qua lity assurance records or other to the water system is available. An adverse effect                        purposes, an app ropriate referen ce to of this strategy is that flooding could impact the                          calculation archive records is also operatio n of equipment located near the site of                            provided.),
break.
* a    de sc rip tion  of  k ey    m od elin g assum ptions selected as the basis for B.3      Products                                                          performing base case or best estimate calculations of plant response and a In general, sufficient information should be                                description of the tec hnical bases for provided in the documentation to allow an                                  these assumptions, independent analyst to reproduce the res ults. At a minimum , the following should be provided:
* a desc ription of p lant-specific calculations performed to exam ine the effects of
* a thorough description of the procedu re                          altern ate mode ling approaches or used to group (bin) individual accident                          assumptions, cuts ets into PDSs, or other reduced set of accident scenarios for detailed Level 2
* if analyses of a surrogate (i.e., sim ilar) analysis,                                                        plant are used as basis for characterizing any aspect of severe accident progression
* a listing of the sp ecific a ttributes or rules                  in the plant being analyzed, references to, used to group cutsets, and                                        or copies of, documentation of the original analysis, and a description of the technical
* a listing and/or com puterized database                          basis for assuring the applicability of providing cross reference for cutse ts to                        results, and PDSs and vice versa.
* for all other        original engineering D o c u m e n t a ti o n o f c o n ta i n m e n t s y s t e m              calculations, a sufficiently com plete performance assessm ents should include a                                  description of the analysis method, B-19
 
Appendix B assum ptions, and calcu lated                    illustrate the logic hierarchy and event re su lts    is  p re p a r e d to              depend encies),
acc om m oda te an independent (peer) review.
* a description o f the techn ical basis (w ith com plete references to documentation of In general, sufficient information in th e                            original engineering analyses) for the documentation of ana lyses p erform ed to establish                    assignment of all probabilities or quantitative containment perform ance lim its is                      prob ability distributio ns with the logic provided that allow s an indep end ent analyst to                      structure, reproduce the results. At a minimum , the following information is documented for a PRA:
* a description of the rationale use d to assign probability values to phenomena or
* a general description of the containment                    eve nts involving subjective, expert structure including illustrative figures to                  judgment, and indicate the general configuration, penetration types and location, and major
* a description of the computer program construction materials,                                      used to exercise the logic model and calculate final results.
* a description of the modeling approach used to calculate or otherwise define              Docum entation of analyses perform ed to containment failure criteria,                      cha racterize radiological source term s should provide sufficient information to allow an
* if com puter m ode ls are use d (e.g ., finite      independent analyst to reproduce the results. At e l e m e n t a n a l ys i s to e sta blis h        a m inim um , the following information should be overpressure failure criteria), a description      documented in a PRA:
of the way in which the containment structure is nodalized including a specific
* the radionuclide grouping scheme used discussion of how local discontinuities,                    and the assumptions m ade to obtain it such as penetrations, are addressed, and                    should be clearly described, and
* if experimentally determined failure d ata
* the time pe riods con sidered for the are u s e d , a sufficie ntly d eta iled                    release and the rationale for the choices description of the experimental conditions                  made.
to dem ons trate applica bility of results to plant-specific containment structures.              Docum entation of analyses performed to cha racterize radiological source term s should T he following documentation is generated to                  provide sufficient information to allow an provide the results and describe the process by              independent analyst to reproduce the results. At which the conditional probability of containment              a m inim um , the following information should be failure is calculated:                                        documented in a PRA:
* tabulated conditional probabilities of
* a summ ary of all com puter code various con tainm ent fa ilure m ode s with                  calculations used as the basis for specific characterizations of time phases                    estimating plant-specific source term s for of severe a ccident progress ions (e.g.,                    selected accident sequences, s pecifically early vs. late containm ent failures),                      identifying those with potential for large releases,
* a listing and description of the structure of the overall logic m odel used to assem ble
* a description of modeling methods used the p ro babilistic representation of                        to perform plant-specific source term containme nt performance (graphical                          calculations; this includes a description of displays of event trees, fault trees, or                    the method by which source term s are other logic fo rm ats are provide d to                      assigned to accident sequences for which B-20
 
Appendix B computer code ca lculations we re              Kum ar, R. K., H. Tamm , and W. C. Harrison, not perform ed,                                Interm ediate -Scale Co m bustio n Studies of Hydrogen-Air-Steam Mixtures, EPRI NP-2955,
* if analyses of a surrogate (i.e., sim ilar)            Electric Power Research Institute, 1984.
plant are used (as a basis for characterizing any aspect of radionuclide                M ar sh al l , B . W . , H y d ro g e n :A ir :S t e a m release): transport or deposition in the                F l a m m a bility Lim its a nd            Co m bu stio n plant being analyzed, references to, or                  Characteristics in the FITS Ves sel, NUREG/CR-copies of documentation of the original                  3468, Sandia National Laboratories, 1986.
analysis, and a description of the technical basis for assuming applicability of results.            Nourbakhsh, H. P., Estim ate of R adionuclide Release Characteristics into Containment Under Documentation of analyses perform ed to                              Severe Accident Conditions, NUREG/CR-5747, cha racterize radiological source term s should                      Brookhaven National Laboratory, November 1993.
provide sufficient information to allow an independent analyst to reproduce the results. At                    O E C D , Im p l e m e n t i n g S e v e r e A c c i d e nt a minimum , a description of the method by which                    Managem ent in Nuclear Power Plants, uncertainties in source terms are addressed                          Organisation for Economic Co-operation and should be documented for a quality PRA.                              Development, Nuclear Energy Agency, 1996.
Pilch, M. M., et al., Reso lutio n of the Direct B.4        References                                              Containment Heating Issue for all W estinghouse P l ants with Large Dry Containm ent o f Subatm ospheric Containm ent, NUREG/CR-6338, Basu, S. and T. Ginsberg, A Reassessment of the                    Sandia National Laboratories, February 1996.
Potential for an Alpha-Mo de Co ntainme nt Failure and a Review of the Current Understanding of                        Pilch, M. M., H. Yan, and T. G. Theofanous, The Broader Fuel-Coolant Interaction Issues, NUREG-                    Probab ility of Containment Failure by Direct 1524, U.S. N uclear Regulatory Comm ission,                          Containment He atin g in Zion, NUREG /CR-6075, August 1996.                                                        Sandia National Laboratories, 1994.
Benedick, W . B., J. C . Cum m ings, and P. G .                      Theofanous, T. G ., et al., In-Vess el Co olability Prassinos, Combustion of Hydrogen:Air Mixtures                      and Retention of C ore M elt, DOE/ID-10460, July in the VGES Cylindrical Tank, NUREG /CR-3273,                      1995.
Sandia National Laboratories, 1984.
Theofanous,          T.      G.,    D e a ling    wit h Benedick, W . B., J. C. Cummings, and P. G.                          Phenomenological Uncertainty in Risk Analysis, P r a s s in o s ,  E x p e r im e n t a l R e s u lts f r o m      W orkshop I in Advanced T opics in Reliability and Com bustion of Hydrogen:Air Mixtures in an                          Risk Analysis, Annapolis, MD, October 20-22, Inte rm ediate -Scale Tank, Proceedings of the                      1993, NUREG/CP-0138, October 1994.
Second International Conference on the Impact of H y d r o g e n o n W a t e r R e a c to r S af e t y ,              Thom son, R. T., Large-Scale Hydrogen NUREG/CP-0038, Sandia National Laboratories,                        Com bustion Exp erim ents , Volume 1: Methodology 1982.                                                                and Results, EPRI NP-3878, Electric Power Research Institute, October 1988.
Breeding, R. J., et al., Evaluation of Severe Accident Risks: Quantification of Major Input                        Torok, R., et al., Hydrogen Combustion and Parameters, Exp erts: Determination of Structural                    Control Studies in Intermediate Scale, EPRI Response Issues, NUREG/CR-4551, Volume 2,                          NP-2953, Electric Power Research Institute, 1983.
Part 3, Sandia National Laboratories, October 1990.
B-21
 
Appendix B Tuom isto, H. and T. G. Theofanous, A Consistent Approach to Se vere Acc ident Ma nag em ent, Nuclear Engineering and Design, 148, 171-183, 1994.
W ong, C. C., HECTR An alys is of Nevada Test Site (NTS) Premixed Combustion E xpe rim ents ,
SAND87 -0956, Sandia National Laboratories, 1987.
B-22
 
Appendix B ATTACHMENT 1 GUIDANCE ON THE EXAMINATION OF CONTAINMENT SYSTEM PERFORMANCE INTRODUCTION                                                  STATUS OF CONTAINMENT SYSTEMS PRIOR TO VESSEL This app end ix disc uss es the key phenomena FAILURE and/or processes that can take place during the evolution of a severe accident and that can have In order to examine the containment performance, an important effect on the containm ent behavior.
the status of the containment systems and related In addition, general guidance on the evaluation of equipment prior to core melt should be determined.
containment system p erformance given the present This requires analyses of (1) the path ways that state of the art of a nalysis of these phenom ena is could significantly contribute to conta inm ent-provided. Th e evaluation should be a pragm atic isolation failure, (2) the signa ls required to exploitation of the present containm ent ca pability.
auto m atica lly isolate the penetration, (3) the It should give an understanding and appreciation of potential for generating the signals for all initiating severe accident behavior, should recognize the events, (4) the examination of the testing and role of m itigating system s, a nd should ultim ate ly maintenance procedures, and (5) the quantification result in the development of accident management of each containment-isolation failure mode procedures that could both prevent and am eliorate (including com m on m ode failures).
the consequences of som e of the m ore probable severe accident sequences involved.                The In the early phase of an accident, steam and information provided here summ arizes som e m ore com bustib le gas es a re the m ain co ntributors to recent developm ents in core melt phenomenology containment pressurization. The objective of the relevant to containment performance, identifies containment decay heat removal systems, such as areas of uncertainty, and suggests ways of sprays, fan cooler, and the suppression systems, proceeding with the evaluatio n of contain men t is to control the evolution of accidents th at w ould performance despite uncertainties, and potential otherwise lead to containment failure and the wa ys of improving containment performance for release of fission products to the environs. The severe accident challenges.
effectiveness of the several containment decay heat rem oval systems for accomplishing the The system s analysis portion of the probabilistic intended m itigating fu nction sho uld be exa m ined to risk assessment (PRA) identifies accident determi ne the p r o b a b il it y o f s uccess ful sequences that oc cur as a resu lt of an initiating performance under ac cident co nditions. T his event followed by failure of various systems or includes potential intersystem dependencies as failure of plant p ersonn el to respond correctly to the we ll as the identification of all the specific functions accident. Although the num ber of poss ible core being perform ed and the dete rm ination of the m elt accident sequ ences is very large, the number mission time considering potential failure due to of conta inment system performance analyses does inventory depletion (coolant, control air, and control not have to be as large. The number of sequences power) or e nvironm ental conditions. If, as a res ult can be reduced by grouping those accident of the accident sequence, the frontline containment sequences that have a s im ilar effect on the plant decay heat removal systems fail to fun ctio n, if their features that determ ine the release and transpo rt effectiveness is degraded, or if the op erato r fails to of fission products.
respond in a timely manner to the accident symptoms, the contain m ent pressure would continue to increase. In this case, some systems that were not intended to perform a safety function might be called upon to perform that role during an acc ident. If the use of such systems is considered during the exam ination, their effectiveness and prob ability of s uccess for fulfilling the needed B-23
 
Appendix B safety function should also be examined. Part of              explosions are not unlike ly and their influ ence on the exam ination should be to dete rm ine if ade qua te      fission product release and hydrogen generation procedures exis t to ensure the effec tive                    are still under investigation. If the fuel-coolant implementation of the appropriate operator actions.          interaction occ urs ex-vess el, as m ight happen if molten fuel fell into a water-filled cavity upon vessel PHENOMENA AFTER VESSEL FAILURE                                meltthrough, it may disperse the corium and lead to rapid pressurization (steam spike) of the If ade qua te heat removal capability does not exist          con tainm ent. In any case, at one extreme, in a particular accident se quence, the core will            abundant presence of water would favor quenching degraded and the contain m ent co uld poten tially            of the corium m ass and the continued dissipation overpressurize and eventua lly fail. Effo rts to              of the decay heat by ste am ing would lead to stab ilize the core before rea ctor vessel failure or to      containment pres surization. Clearly in the absence extend the time available for vessel reflood should          of external cooling, the conta inm ent will eventu ally be investigated. For certain accident groups that            overpressu rize and fail, although the presence of proceed past vessel failure, the containment                  extensive, pas sive h eat sink s (structures) within pressurization rate could exceed the capability of            the containmen t volume would delay the the mitigating systems to reject the energy                  occurrence of such an event.              Fuel-coolant associated with the severe accident phenomena                interactions can also yield a chem ical reaction encountered with vessel failure. For each such                between steam and the metallic component of the accident sequen ce, the m olten core debris will              m elt, producing hydrogen and the consequent relocate, melting through and mixing with m ate rials        potential for burns and/or explosions.
in its path.        Depending on the particular containment geometry and the accident sequence                At the other extreme, when water is not available, groups, a variety of important phenomena                      the principal interaction of the m olten c orium is with influence the challenges to conta inm ent inte grity.        the concrete floor of the containm ent.            This interaction produces three challenges to The guidance provided below deals with this                  conta inm ent integrity.        First, the co ncrete subject at three levels. The first provides som e            decom position gives off noncondensible gases rather general considerations regarding the nature            (CO 2, CO) that contribute to pressurizing the of these phenomena as they impact con tainm ent.              containment atmosphere. Second, concrete of The second level considers the manifestation of              certain compositions decompo ses and releases these phenom ena in m ore detail w ithin the generic          CO 2 and steam, which can interact with the m eta llic high and low press ure scenarios. Finally, the third          com pon ents in the m elt to yield highly fla m m able level pro vides som e specific guidance particularly          CO and H 2, with potential consequences ranging regarding the treatment of certain important areas            from benign burns at relatively low hydrogen of uncertainty.                                              concentrations to rapid deflagrations at high hydrogen concentrations.            Third, continued pen etration of the floor can directly breach the General Description of the containment boundary. Also, thermal attack by the Phenomena Associated with Severe                              molten corium of retaining sidew alls could produce Accident Considerations                                      structural failure within the containment causing damage to vital systems a nd perhap s to failure of The contact of molten corium with water, referred            conta inm ent boundary.
to as fuel-coolant interaction, can occur both in-vessel and ex-vessel. If the interaction is energetic        Another type of fuel interactio n is with the inside the rea cto r vessel, it may generate missiles        con tainment atmosphere.          Scenarios can be and a rapid pressurization (steam explosion) of the          postulated (e.g., station blackout) in which the primary system .        Ea rly containm ent failure          reactor vessel and primary system rem ain at high associated with in-vessel steam explosions (alpha            pressure as the core is m elting and re locating to mode failu re) is g enerally considered to be of low          the bottom of the vessel. Continued attack of the enough likelihood to not warrant additional                  molten corium on the vessel lower head could consideration (Basu an d Ginsbe rg, 1996).                    eventua lly cause the lower head to fail. Because of How ever, smaller, less energetic in-vessel steam            a potentially high driving pressure, the molten B-24
 
Appendix B corium could be energetically ejected from the              fraction of that of water (about one third), and one vess el. Uncertainties remain related to the effect          should expect significant core (decay) energy of the following on direct containment heating: (1)          redistribution due to natural circulation loops set up vessel failure area, (2) the amount of molten                between the core and the re m aining cooler corium in the lower head at the time of failure, (3)        com pon ents of the prim ary syste m . As a result of the degree to which it fragments upon ejection, (4)          this ene rgy redistribution, the primary system the deg ree a nd e xten t to wh ich a path from the          pressure boundary could fail prior to the lower cavity to the upper containment atmo sphere            occurren ce of large-scale core m elt. The location is obstructed, (5) the fragmente d molten corium            and the size of failure, however, remain uncertain.
that could enter and interact with the upper                For example, concerns have been raised about the containment atmosphere, and (6) cavity gas                  pos sibility of ste am gen erato r tube failures and temperature. Since the con tainm ent atm osphere            associated containment bypass. If the vessel lower has small heat capac ity, the energy in the                  head fails, violent melt ejection could produce fragmented corium could rapidly transfer to the              large-scale dispersal and the direct containment conta inment atmosphere, causing a ra pid                    heatin g phenom enon m ention ed pre viously.
pressurization. The severity of such an event co uld be further exacerbated by any hydrogen that may              Concerns may also be raised about the poten tially be sim ulta neously dispersed and direct oxidation          energetic role of hydrogen within the blowdown (exothermic) of a ny m etallic compo nen ts.                process. The pre sence of hydrogen arises from Depending upon this and the other factors                    two com plem entary m echanism s: (1) the m eta l-previously m ention ed, this pre ss urization could          water reaction occurring at an accelerated pace cha llenge con tainm ent inte grity early in the event.      throughout            the    in-vessel          core heatup/meltdown/slump portion of the transient and Even with the above lim ited perspective, it s hould        (2) the rea ctio n betw een any re m aining m eta llic be clear that given a core melt accident, a great            com pon ents in the melt and the high-speed steam deal of the phenomenological progression hinges              flow that partly overlaps and fo llows th e m elt upon water availability and the outco m e of the fu el-      ejection from the reactor vessel. The combined coolant interactio ns; sp ecifically whethe r a full        result is the release of rather large quantities of quench has been achieved and whether the                    hydrogen into the containment volume within a resulting particulates will rem ain co olable. In            short time period (a few tens of seconds). The general, the presence of fine particulates to any            implication is that the consideration of containment significant degree would imply the occurrence of            atm osphe re compositions and associated burning, energetic steam explosions and hence the                    explosio n, or detonation potential becomes presence of significant forces that would be                com plicated by a whole range of highly transient expected to disperse the particulates to coolable            regimes and large spatial gradients.
configurations outs ide the reactor cavity.
Otherwise, the coolability of deep corium be ds of          The NU REG -1150 severe accident risk study coarse particulates is the m ajor c onc ern.        A      (NRC, 1990) was the first system atic attem pt to sum m ary of how these mechanisms interface and              treat direct containment heating (DCH) from a PRA interact as they integrate into an accident                  perspective by integrating s equ enc e pro bab ilities sequence is given below.                                    with uncertainties associated with initial/boundary conditions and phenomenological uncertainties Accident Sequences:                High-Pressure            associated with predicting containment loads.
Scenario Since the completion of the NUREG-1150 study, advances have bee n m ade in the ability to predict The core melt sequence at high primary system the pro bability of contain m ent failure by D CH in pressure is often due to a station blackout pressurized water reactors. The U.S. Nuclear sequence.      The high-pressure scenario also Regu latory Com m ission has identified DCH as a represe nts one of the most significant contributors major issue for resolution in the Revised Severe to risk. The initial stages of core degradation Accident Research plan and has sponsored involve coolant boiloff and core heatup in a steam an alytic al and experim ental program s for environm ent.      At such high pressures, the understanding the key physical processes in DCH.
volum etric heat capacity of steam is a significant B-25
 
Appendix B An extensive database resulted from scaled                  containment atmosphere. Throughout this core counterpart experim ents c onducte d by Sandia              heatup and m eltdow n pro ces s, the potential to National Laboratory and Argonne National                    significantly load the containment is small. The Laboratory.      This database has allowed the              first pos sibility for significant energetic loads on the development and validation of simple analytical              containment occurs when the m olte n core debris m odels for predicting the con tainment load s. In          penetrates the lower core support structure and particular, a two-cell equilibrium m odel was                slumps into the lower plenum. Th e outc om e of this developed based on insight from the experimental            interaction cannot be predicted prec isely. Th us, a program and has been used in the DCH issue                  wh ole ran ge of b ehavior m ust be considered in resolution process. The two-cell equilibrium m odel          order to cover subsequent events. At the one takes into account the coherence between the                extreme, the interaction is benign, yielding no m ore entrained deb ris and the reac tor coolant system            than som e stea m (an d hydrogen) production while blowdown steam.                                              the melt quickly reagglomerates on the lower reactor vessel head. At the other extreme, an The results of a probability assessm ent of DCH-            energetic steam explosion occurs. It may be induced con tainm ent failu re for the Zion Nuclear          poss ible to disting uish intermediate outcomes by Power Plant were published in NUREG /CR-6075                the degree to w hich the vessel integrity is and its supplement (Pilch, Yan, and Theofanous,              deg rade d. In analyzing this phase of the accident 1994). NUREG /CR-6338 (Pilch et al., 1996) used              scenario, the important task s are to determine the the methodology and scenarios described in                  likelihood of containment failure and to define an NURE G/CR-6075 to address the DCH issue for all              envelope of co rium relocation p aths into the W estinghous e p l a n ts w i th l a rg e volum e            con tainm ent. The latter is needed to ensure the containments, including 34 plants with large dry            assessment of the potential for such a con tainm ents and 7 plants with subatm ospheric            phenomenon as liner meltthrough.
contain ments.        DC H loa ds versus s treng th evaluation were perform ed in a consistent manner            Consideration should also be given to ex-vessel for all plants. The phenomenological modeling was            coo lability as the corium can potentially interact closely tied to the experimental database. P lant-          with the concrete. The non-energetic release specific analyses were performed, but sequence              (vessel lower head meltthrough) and spreading uncertainties were enveloped by a small number of            upon the accessible portions of the containment splinte r scenarios w ithout a ssig nm ent o f              floor below the vessel needs to be examined.
probabilities. The results of screening calculations        The re is a gre at deal of variability in accessible reported in NURE G/CR-6338 indicate that only one            floor area am ong the various designs for some plant showe d a containm ent conditional failure            pressurized water reactor cavity design s. The area prob ability based on the mean fragility curves              over which the core debris could spread is rather greate r than 0.001. The containment conditional            sm all given who le-core m elts and the resultant pool failure pro bability for this one plant was found to be      being in excess of 50 cm deep. In the absence of less that 0.01.                                              water, all these configuratio ns would yield con crete attack and decom pos ition of va riable inte nsity. In Accident Sequences:                  Low-Pressure            the pre sence of wate r (i.e ., co nta inm ent sp rays),
even deep pools m ay be considered quenchable Scenario and coolable. How ever, the poss ibility exists for insulating crusts o f va por ba rriers at the corium-At low system pressure, decay heat redistribution water interface.
due to natu ral circ ulation flow (in stea m ) is negligible and core d egradation occu rs at nearly Both of these two extremes should be considered.
adiabatic con ditions. Steam boiloff, togeth er with The task is to estimate the range of containm ent any hydrogen generation, is continuously released internal pressures , tempe ratures, and gas to the contain m ent atm osphere, where m ixing is compositions as well as the exten t of co ncrete floor driven by natural convection c urrents cou pled with penetration and structu ral atta ck until the situation condensation processes. The upper internals of has been stabilized. In general, pressurization the reactor vessel rem ain relatively cold, offering from continuing core-concrete interactions (dry the pos sibility of trapping fission product vapor and case) would be considerably slower than from aerosols before they are released to the B-26
 
Appendix B coolable debris configurations (wet case) because              each one of these areas is briefly summ arized of the absence of steam pressurization.                        below.
As a final and crucial part of this scenario, one              The concerns about deep corium pools arose from must address the com bustible gas effe ct. Th is              exp erim ents with top-flooded melts that exhibited must include evaluation of the quantities and                  crust form atio n and long-term isolation of the m elt composition of combustible gases released to the              from the water coolant.            S uch noncoolable con tainm ent, local inerting and deinerting by steam          configurations wou ld yield con tinuing con crete and CO 2, as well as hydrogen m ixing and tra nsp ort.        attack and a containment loading behavior Also included should be consideration of gaseous              significantly different from coolable ones. On the pa thw ays between the cavity and upper                        other hand, it has been pointed out that sm all-s cale containment volume to confirm the adequacy of                  exp erim ents would unrealistically not favor comm unication to support natural circulation and              coolability. This is an area of uncertainty and it is recombination of c om bustib le gases in the reactor          recomm ended that assessments be based on cavity.                                                        available cavity (spread) area and an assumed m axim um coolable depth of 25 cm. For de pth s in GENERAL GUIDANCE ON                                            excess of 25 cm, both the coolable and noncoolable outcomes should be considered.
CONTAINMENT PERFORMANCE Along these lines, the PRA should document the geom etric details of cavity configuration and flow In the approach outlined in this appendix, em phasis paths out of the c avity, including an y water dra in is placed on those areas that would ensure that the areas into it as appropriate.
PRA process considers the full range of se vere accidents. The PRA process should be directed W ith respect to hydrogen, the concerns are related toward developing a plant-specific accident to com pleteness of the current understanding of managem ent scheme to deal with the pro bable hydrogen m ixing and transport.              In general, causes of poor containment performance. To com bustibles accum ulate very slowly and only if achieve these go als, it is of vital im porta nce to continuing concrete attack is postulated. For the understand how reliable each of the containmen t larger dry containments, because of the large event tree estimates are , and what the driving containment volume and slow release rates, factors are. Decisions on potential improv em ents compositions in the detonable range may not should be made o nly a fte r ap prop riately develop unless significant spatial concentrations considering the sources of uncertainties.            Of exist or significant steam condensation occurs. In course, pre ventin g fa ilure altogethe r is predicated general, the contain ment atmosphere under such upon recovering some contain ment heat removal conditions would exhibit strong natural circulation capability. Given that in either case pressurization currents that would tend to counteract any develops on the tim e scale of many hours, fea sible tendence to stratify. However, condensation-driven recovery actions could be planned as part of circulation patterns and other potential stratification acc ident m ana gem ent.
m echanism s could limit the extent of the containment volume participating in the mixing The bulk of phenomenological uncertainties process. For these plants with igniters, the buildup affecting containment response is associated with of com bustibles from con tinuing corium -concrete the high-pressure scenarios. Unless it can be interactions could be limited by local ignition and demonstrated that the primary system can be burning.      Howev er, oxygen availability as reliably depress urized , a low probability of ea rly determined from natural circulation flow s could lim it containment failure should not be autom atic ally the effectiveness of this m echanism .                It is assumed.
recomm ended that, as part of the PR A, a ll geom etric details impacting the above phenomena Low-pres sure sequences, by comparison, present (i.e., heat s ink distribution, circulation paths, few remaining areas of co ntroversy. These areas ignition sources, w ate r availability, a nd gra vity drain include the coolability behavior of deep molten paths) be documented in a rea dily com prehens ive corium pools and the behavior of hydrogen (and form , togeth er with rep resenta tive com bustib le ot her c om b u s ti b le s ) in th e c o n ta i n m e nt source transients.
atmosphere. The views and guidance concerning B-27
 
Appendix B Fin ally, unc ertainties arise for all plants because of          NRC, Severe Accident Risks: An Assessment for lack of knowledge on how the corium will spread                  Five U.S. Nuclear Power Plants, NUREG -1150, following discharge from the reactor vessel. The                  U.S. Nuclear Regulatory Com mission, Decem ber reactor cavity configuration will influence the                  1990.
potential for direct attack of the liner by dispersed debris, as well as the potential for basemat failure              Pilch, M. M., et al., Resolution of the Direct or structural failure due to thermal attack. The s taff          Containment Heating Issue for all W estinghouse recomm ends that the PRA docum ent describe the                  Plan ts with La rg e D ry C ontainm ent o f detailed geometry (including curbs and standoffs)                Su batm ospheric Containment, NUREG /CR-6338, of the drywell floor.                                            Sandia National Laboratories, February 1996.
REFERENCES                                                        Pilch, M. M ., H. Yan, and T . G. The ofanous, The Probab ility of Containment Failure by Direct Basu, S., and T. Ginsberg, A Reassessmen t of                    Containment Heating in Zion, NUREG/CR-6075, the Poten tial for an Alpha-M ode C ontain m ent                  Sandia National Laboratories, 1994.
Failure and a Review of the Current Understanding of Broader Fuel-Coolant Interaction Iss ues ,
N U R E G - 1 5 2 4 , U . S . N u c le a r R e g u la t o ry Com mission, August 1996.
B-28
 
APPENDIX C EXAMPLE CONSIDERATION OF A FLOOD SCENARIO IN A PRA An exam ple of the analysis of a typical flood            NF    =    total frequency of flooding events for sc enario is given fo r further guidance.        T his                scenario FLOODB exam ple gives some indication of the process required to construct detailed flood scena rios for        N F,M =    frequency of floo ding eve nts that m ay initial refinem ent.                                                  occur during maintenance activities In one rec ent probabilistic risk asses sm ent (PRA ),    N F,O =    frequency of flooding events that m ay an internal flooding scenario, designated FLOODB,                      occur at other times.
was defined to bound the freque ncy and im pac ts from potential flooding events in the annulus. Th is flooding scenario was retained after the original          C.1        Maintenance Events screening evaluations.
The frequency of maintenance-related flooding The annulus con tains relatively large, open, events was evaluated by the following expression:
interconnected floor areas at the lowest level, Eleva tion-6.0 m . All elevations in the annulus are N F,M = 3 * [8 mf d(T/2)(N SW /3) + 8 m(8,760)f ff c +
also interconnected through open stairwells and 8 md m(N SW /3)fc]
floor grating. Th erefore, it w as concluded that only one water source pre sents a significant hazard for where submerging PR A eq uipm ent that is located at Eleva tion-6.0 m. Scenario FLOODB acc oun ts for 8m    =    f r e q u e nc y    o f T F h e a t e x c h an g e r floods that originate from the nuclear service water maintenance (maintenance events per (VE) connections to the nuclear component cooling hour) water (TF) heat exc han gers . It was conserva tively assumed for the screen ing an alysis that a flood fd    =    likelihood that personnel fail to restore the from any one of the three heat exchangers would heat exchanger vault to normal conditions be of sufficient size and would continue long after maintenance has been completed; enough to submerge all equipment at Elevation-6.0 e.g., failure to reclose the door (error per m.
m ainten anc e event)
Each TF heat exchanger is enclosed in a watertight T      =    tim e interval between routine annulus vault sealed by a normally closed door. Therefore, inspections (hours) in addition to evaluatin g the frequency of events that could cause significant flooding from the VE N SW =      frequency of Other Service W ate r system, the analysis for scenario FLOOD B also S y s te m - R e l a t e d Flo o d i n g E v e n ts accounts for coincident failure of these barriers.
(flooding events per plant year)
Exam ination of the event summ aries in the flood ff    =    fraction of maintenance events that lead database reveals tha t a num ber o f flood ing events directly to inadvertent loss of system in the generic database have involved personnel integrity (flooding events per maintenance errors during testing and maintenance activities.
event)
Therefore, the analysis for scenario FLOODB evaluated tw o m ajor contributions to the flooding fc    =    likelihood that personnel fail to stop the event fre quency:
flood before equipment is damaged, e.g.,
failure to turn off the VE pumps or close NF      =        N F,M + N F,O the va ult doo r (erro r per flooding event) where dm    =    m ean d ur atio n o f T F hea t exchanger maintenance (hours per maintenance event).
C-1
 
Appendix C The expression contains an overall multiplication
* Frequency      of    TF    He at    Exchanger factor of 3 beca use the term s inside the brac kets          Maintenance (8 m). The m ean frequency of TF evaluate the total maintenance-related flooding              heat exchanger m ainten anc e from the plant-frequen cy for o nly one hea t exchan ger vault.              specific PRA database is 3.91 x 10 -5 maintenance event per heat exch anger hou r.
The first term in the expression acco unts for a condition in which maintenance has been
* Failure to Reclose W atertight Door (fd). A performed in one of the heat exchanger vaults (8 m).          nominal value of 5 x 10-3 error per How ever, personnel m ay fa il to secure the                  maintenance event is used for this error rate.
watertight door properly after the maintenance                This value is based on generic human error work has bee n com pleted (fd). A flo od will occur if        rates that are typically applied for failures to the VE connection fails (N sw/3) before the operators        restore equipment to the proper configuration discover the open doo r during the ir routine                after testing or maintenance activities.
inspections (T/2). The fraction (T/2) in this term acc oun ts for the fact that the average exposu re
* Annulus Inspection Interva l (T). It is assumed period for this condition is one-half the annulus            for this analysis that a routine inspection of routine inspection interval. The fraction (N sw/3)            the annulus is performed at least once each acc oun ts for the fact that approximately one-third          shift and that the open door would be of the tota l frequency for Other Service W ater              discovered during this inspection. Therefore, System-Related Flo od ing Events from the                    the average time interval between inspections database is allocated to each of the three TF heat            is eight hours.
exchanger vaults.
* Frequency of Service W ater F looding Events The second term in the expression accoun ts for a            (N SW ). The da tabase shows that the mean condition in which maintenance is performed in one            frequency of Other Service W ater System-of the heat exc hanger vaults (8 m). However,                Related Events is 3.81 x 10 -3 flooding event personnel errors during the m aintenance wo rk                per plant year. The data analysis portion of cause a flood from the VE system (f f).                      the PR A do cum ents that all of this frequency Maintenance and operations personnel fail to stop            was conservatively allocated to the TF heat the flood before the PRA equipment is submerged              exchanger vaults in the annulus.
(f c). The m ultiplication factor of 8,760 in this term con verts the hourly frequency of TF heat
* Fraction of Maintenanc e Events that Involve exchanger maintenance into an equivalent annual              Floods (f f). The flooding events database frequency.                                                    used con tains o ne e vent related directly to errors during heat exchanger maintenance.
The third term in the expression acc ounts for a              The database includes experience from a condition in which m aintenance is perform ed in one          total of 740 plant years of operation through of the heat exchanger vaults (8 m). A floo d will            July 1987. The generic mean frequency of occur if the VE connection fails (N sw/3) during the          heat exchanger maintenance from Module VI maintenance interva l while the wate rtight door is          is approxim ate ly 4.15 x 10-5 maintenance open (d m). Maintenance and operations personnel              event per heat ex changer ho ur.            It is fail to stop the flood before the PRA equipm ent is          conservatively assumed that each plant in the submerged (f c). The fraction (N sw/3) in this term          flooding events database contains only two acc oun ts for the fact that approxima tely one-third        heat exchangers. Therefore, the total number of the total frequency for Other Service W ater              of heat exchanger m ainte nance events in System-Related Flooding Events in the flood                  740 plant years is approxim ate ly:
database is allocated to each of the three TF heat exchanger vaults.                                            2*(4.15    x  10 -5)*(8,760)*(740)    =    538 m ainten anc e events The following num erical values were used in this analysis:                                                    Thus, an approxim ate estim ate for variable f f is 1/538 floods per heat exchanger m aintenance event.        How ever, the re is C-2
 
Appendix C substantial uncertainty about this                8 mf d(T/2)(N SW /3) = 9.93 x 10 -10 flood per year es tim a te . T h e refore, a lognorm al prob ability distribution was c reate d to        8 m(8,760)f ff c = 4.86 x 10 -6 flood per year represent this conditional frequency, using a median value of 2 x 10-3 and a            8 md m(N SW /3)fc = 1.43 x 10 -8 flood per year range factor of 10. The resulting m ean value for f f is 5.33 x 10 -3 flood per heat      T he total frequency of heat exchanger exc han ger m ainten anc e event.                maintenance-related floo ding events is three times the sum of these contributions for each heat
* Failure to Stop the Flood before Dam age              excha nger:
Occ urs (f c). lf a flood begins while personnel are in the heat exchang er vau lt, there are          N F,M =    1.46 x 10-5 flood per year several opportunities to stop the flow before the annulus is flooded to a depth that will            C.2        Events Not Related                              to submerge the PRA equipment. For example, local personnel m ay call the control room and                    Maintenance request that the appropriate VE pumps be stopped. Loc al person nel m ay also try to            The frequency of flooding events th at are not close the watertight doors to contain the flood        related to heat exchanger maintenance activities water inside the vault. It is very unlikely that      was evaluated by the following expression:
no attempts would be made to alert the control room or to sto p the flo od locally if        N F,0 =    N SW f v + 8 v(T/2)N SW personnel were in the area and w ere physically able to respond. A lognormal                where prob ability distribution was crea ted to account for a variety of possible conditions that could        N SW =      frequency of O the r S er vic e W ate r delay res ponse until th e PRA equipm ent is                      S y s te m - R e l a t e d F l o o d in g E v e n ts submerged.          This distribu tion ac cou nts                  (flooding events per plant year) generally for such factors a s extrem ely severe floods that incapacitate all personnel in the          fv      =  likelihood that a closed vault door fails vault, unexpecte d com m unication delays ,                        when a flood occurs inside the vault failure of independent indications in the                          (failures pe r flood ing event) control room, etc. A m edian value of 1 x 10 -3 and a range facto r of 10 were as signed to            8v      =  frequency that a heat exchanger vault account subjectively for these possible                            door is opened and left open during conditions. In other words, it was assumed                        norm al plant operation (errors per hour) that approximately one flood in one thousand events would be severe en oug h to disable the        T      =  tim e interval between routine annulus local personnel and would continue long                            inspections (hours).
enough to subm erge the PRA equipment before it is discovered and controlled. The            The first term in the exp ression acc ounts for a mean value for f c from this distributio n is 2.66    condition in which the VE connection fails in one of x 10 -3 failures per flooding event.                  the three heat exchanger vaults (N sw). The heat exchanger vault door is closed when the flood
* Mean Duration of T F H eat E xchanger                  occurs, but it fails (f v).
Maintenance (d m). The mean duration of TF hea t exc han ger m ainten anc e from the plant-      The second term in the expression accounts for a specific PRA database is 108 hours per                condition in which personnel have opened one of m ainten anc e event.                                  the heat excha nger vault doors and have inadverten tly left it open (8 v). A flood will occur if These values we re us ed to estim ate the following        the VE connection fails (N sw) before the operators contributions from each of the three maintenance            discover the open door during their routine conditions:                                                inspections (T/2). The fraction (T/2) in this term C-3
 
Appendix C acc oun ts for the fact that the average ex posure                    was estim ate d by assuming that any one of period for this condition is one-half the annulus                      the three vau lt doors may be left open routin e inspection interva l.                                        inadverten tly approxim ate ly once in five years during plant power operation. Therefore:
The following numerical values were used in this analysis:                                                              8 v high        =      1/(3
* 5
* 0.88
* 8,760)
* Frequency of Service Water Flooding Events                                      =      8.65 x 10-6 error per hour.
(N sw). The plant-specific database shows that the m ean frequen cy of O ther Service W ater                    In this calculation, the factor of 3 accounts for System-Related Events is 3.81 x 10 -3 flooding                  the three heat exchanger vault doors; the event per plant year.            The database                  factor of 5 accounts for the assumed documentation also indicates that all of this                    frequency of one error in five years; the factor frequency was conserva tively allocated to the                  of 0.88 is the average availability factor for the TF heat exchanger vaults in the annulus.                        pla nt; and the factor of 8,760 converts the annual frequency into an equivalent hourly
* Failure of Clo sed W atertight Door (fv). The                    frequency.
heat exchanger vault doors are designed specifically to contain a flood from the VE
* Annulus Inspection Interval (T). It is assumed system. No detailed structural analyses were                    for this an alysis tha t a routine inspection of performed to evaluate the capacity of these                      the annulus is performed at least once each doors under realistic loading conditions.                        shift and that the open door would be However, structural evaluations of other                        discovered during this ins pec tion. Therefore, equipment at the plant and analyses at other                    the average time interval between inspections plants have typically concluded that the                        is eight hours.
likelihood for failure is extrem ely small under realistic loading co nditions, i.e., the structural    These values were used to estimate the following design safety margin is typically quite large.          contributions from each condition:
A nom inal value of 1 x 10 -6 failure per flooding event was u sed for f v.                                N SW f v        =        3.81 x 10-9 flood per year
* Frequency that a Vault Door is Left Open (8 v).        8 v(T/2)N SW =          1.32 x 10-7 flood per year The TF heat exchanger vault doors are norm ally closed at all tim es unless w ork is          The total frequency of flooding events that are not being performed in a vault. The frequency of            related to m aintenance activities is the sum of m aintenance-related flooding events accounts          these contributions:
for the fraction of time that a door may be open for maintenance work. Variable 8 v                N F,0 =        1.36 x 1-7 flood per year.
acc oun ts for the combined frequency of other activities that open a door and the likelihood          C.3            Frequency of FLOODB that it m ight be left open, e.g., special inspections, maintenance or modification The total initiating event frequency for internal planning, etc.
flooding scenario FL OO DB is the sum of the two major contributions:
The re is no evidence from plant records or from discuss ions with plant operations NF      =      N F,M + N F,0 personnel that any of the TF heat exchanger vault doors has ever been found open during
                                                                      =      1.46 x 10-5 + 1.36 x 10 -7 the 12-year period examined for this analysis.
How ever, a conservative upper bound for 8 v
                                                                      =      1.47 x 10-5 flood per year.
C-4
 
Appendix C The plant model was quantified with the above          Sp ecifically, all equipment at the lowest level of the initiating event freq uen cy and with changes made    annulus were assumed to be unavailable following to the affec ted event tree top event and system      the flood.
mod els to reflect the impact of the flood.
C-5
 
APPENDIX D EXAMPLE CONSIDERATION OF A FIRE SCENARIO IN A PRA An example of a portion of a fire analysis in a              fault trees. The event m odel is requantified using recent PRA is summ arized in Table D-1. In the              the fire frequency determ ined fo r this scenario scenario sum m arized in T able D -1, a fire is              along with the system and event level impacts, postulated to occ ur in the D ivision 2 Electronics          resulting in a determination of the plant response to Room affecting all equipment in that room. The              fires in this area. The results, in this case, showed analysis of the frequency of all fires in that location,    that the scenario could be screened from further based on the num ber of electronic cabinets,                consideration after this first round of refine m ent. If amount of cable, and the likelihood of transient fire        that had not been the case, the scenario would sources had been assessed to have a mean value              have received furthe r attention an d refinem ent. In of 2.11 x 10 -5 fire per year. The fire was retained        such a case, th e scenario would have been divided after the screening pro cess that co nsidered only          into two scenarios: one scenario of relatively low the occurrence frequency. The impacts on the                frequency that im pacte d all the cabinets in the systems considered in the PRA were determined                room and a second scenario of relatively high nex t. These are summ arized in the "notes" section          frequency that im pacted only the cabinet with the of the table in the form of the specific impacts on          m ost s evere effect on the plant.
event tree top events (or split fractions) or system D-1
 
Appendix D Ta ble D -1 Ex am ple fire sc enario table BUILDING                                            E LOCATIONS                                            E0456, E0457, E0459 LOCATION NAME                                        Division 2 Electronics Cabinets Room ,
Elevation 7.6 me ters LOCATION DESIGNATOR                                  L2 SCENARIO DESIGNATOR                                  FIREL2
: 1. TYPE OF HAZARD SOURCE
: 2. SCENARIO INITIATION
: 3. PATH OF PROPAGATION A. PATH TYPE                                    None (localized)
B. PROPAGATE TO                                N/A
: 4. SCENARIO DESCRIPTION                            Fire affects all Division 2 electronics cabinets , includin g reactor protection.
: 5. HAZARD MITIGATION FEATUR ES                    Detectors, Halon
: 6. SCENARIO FREQUENCY                              2.11E-05 per year
: 7. PRA EQUIPMENT W ITHIN THE AREA Equipment                              Top Event                      Equipment Impact Division 2 electronics cab inets                  Note 1                              Note 1
: 8. RE TA INE D A FT ER SC RE EN ING AN ALYSIS              YES
: 9. NOTES This fire scenario affects all cabinets in this room.
: 1. The impacts from these fires are bounded by disabling all equipm ent co ntrol and actua tion signals from Division 2. The following split fraction rules are used to account for the possible impacts from open circuits that may prevent equipment from operating and short circuits that may cause spurious actuation signals.
* Top  Event  BB (10 kY nonessential power) is failed.
* Top  Event  BY (6 kV essential power) is failed.
* Top  Event  S1G2 (Division 2 actuation signal relays) is failed.
* Top  Event  REC1 (recovery of offsite power to the 6 kV essential buses) is failed.
D-2
 
Appendix D Table D-1 Example fire scenario table (contd)
* The split fraction rules for Top Eve nts PZR L (pressurizer low level), RC SP (reac tor coolant system low pressure), CNTP (containment high pressure), SG lL (steam generator 1 low level), SG2L (steam generato r 2 lo w level), and SG3L (steam generator 3 low level) are modified to account for loss of the Division 2 signals for these fractions.
* The split fraction rules for Top Event TFIS are modified to account for possible los s of th e isolation signa l for valve TF 8O SSOI.
* The split fraction rules for Top Even ts TFR B and T FSB are modified to account for poss ible spurious isolation signals for valves TFlOSO S2 , TF 6O SO Ol, an d T F6050 30. T op E vents TFRB and TFSB are failed for these fires.
* T he split fractio n ru les for Top Event SU FW are m odified to acc ount for poss ible spurious main feedwater isolation signals for steam generator 2.
* The split fraction rules for Top Event CHF are m odified to account for possible spurious isolation signals for valve TA305003. Top Event CHEF is failed for these fires.
* The split fraction rules for Top Event RCPS are modified to account for loss of the Division 2 autom atic reactor coolant pump trip signals. Top Event RCPS is failed if reactor coolant pump YD2O is running and nuclear component cooling water flow is lost to the bearing oil coolers.
* The split fraction rules for Top Events LDI, LDO, and CIB are modified to account for loss of the Division 2 isolation signals for the letdown line valves.
* The split fraction rules for Top Event LPC are modified to account for Division 2 isolation signals that prevent RHR cooling from Train TH2O.
D-3}}

Latest revision as of 00:52, 14 January 2025

NUREG/CR-6572, Rev. 1, BNL-NUREG-52534-R1, Kalinin VVER-1000 Nuclear Power Station Unit 1, PRA, Procedure Guides for a Probabilistic Risk Assessment
ML103620076
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/28/2010
From:
Brookhaven National Lab (BNL), NRC/RES/DRA
To:
SECY RAS
Shared Package
ML103620074 List:
References
License Renewal 2, RAS 19324, 50-346-LR, BNL-NUREG-52534-R1 NUREG/CR-6572, Rev 1
Download: ML103620076 (213)


Text