| issue date = 11/14/2011 | | issue date = 11/14/2011 | ||
| title = 2010 DFS Report Analysis for Vogtle (Alvin W.) Nuclear Plant, Unit 2 | | title = 2010 DFS Report Analysis for Vogtle (Alvin W.) Nuclear Plant, Unit 2 | ||
| author name = Szabo A | | author name = Szabo A | ||
| author affiliation = NRC/NRR/DIRS | | author affiliation = NRC/NRR/DIRS | ||
| addressee name = | | addressee name = | ||
| Line 13: | Line 13: | ||
| page count = 3 | | page count = 3 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:Datasheet 1 Signature: Michael Purdie, Jo Ann Simpson Date: 07/18/2011 Secondary Review: Kosmas Lois, 8/5/2011 Spreadsheet created by: Aaron Szabo, Shawn Harwell Formulas verified by: Clayton Pittiglio 1 | |||
2 | |||
% Owned: Category: | |||
45.70% | |||
1 30.00% | |||
1 22.70% | |||
1 1.60% | |||
1 3 | |||
4 variable1 variable1 variable1 N | |||
N Y | |||
N N | |||
N2 5 | |||
6 Any modifications to a licensee's method of providing decommissioning funding assurance? (Y/N) 7 If a change has occurred, the reviewer will document on this sheet that a change has occurred and identify the reviewer who will evaluate the change: (see below) 1 Rates provided are variable because the rates are not consistent throughout the licensee(s) and/or years of operation/decommission (See "Notes" for additional comments). | |||
3 Oglethorpe Power Corporation executed a revised Trust Agreement in August 2010, which was provided to the NRC in March 2010 (ML101090080). | |||
2 Municipal Electric Authority is relying upon a PPA, which was included in the Attachments 2 & 3 of the DFS report. | |||
2 Rates for Oglethorpe could not be determined based upon submitted information. | |||
Licensee: | |||
$107,725,000 Amount in Trust Fund: | |||
Y4 Any material changes to trust agreements? (Y/N) | |||
N | |||
$8,742,401 Post-RAI Rates Determined (Y/N) | |||
Oglethorpe Power Corporation Georgia Power Company Y | |||
$459,684,000 The total amount of dollars accumulated at the end of the appropriate year: (see below) | |||
Y3 Assumptions used in determining rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections: (see below) | |||
Any contracts upon which the licensee is relying? (Y/N) | |||
Schedule of the annual amounts remaining to be collected: (provided/none) | |||
Rate of Return on Earnings Allowed through Decom (Y/N) | |||
Rate(s) of Other Factors | |||
$241,365,082 Real Rate of Return PUC Verified (Y/N) | |||
$76,299,281 Total Trust Fund Balance Plant name: | |||
Vogtle (Alvin W.) Nuclear Plant, Unit 2 50-425 RAI Needed (Y/N) | |||
PUC Verified (Y/N) | |||
$48,598,400 none Docket Number: | |||
Did the licensee identify the amount of estimated radiological funds? (Y/N) | |||
The minimum financial assurance (MFA) estimate pursuant to 10 CFR 50.75(b) & (c): | |||
Escalation Rate Allowed through Decom (Y/N) | |||
Municipal Electric Authority Dalton Utilities | |||
Datasheet 2 Signature: Michael Purdie, Jo Ann Simpson Date: 07/18/2011 Secondary Review: Kosmas Lois, 8/5/2011 Spreadsheet created by: Aaron Szabo, Shawn Harwell Formulas verified by: Clayton Pittiglio Month: | |||
12 2 | |||
PWR 3625 | |||
$105,000,000 112.8 1.98 0.65 2.23 1.675 191.3 114.2 3.074 252.1 82.0 0.13 2.263 0.22 12.28 | |||
% Owned: | |||
Category 45.70% | |||
1 30.00% | |||
1 22.70% | |||
1 1.60% | |||
1 2% | |||
38.11 2% | |||
2% | |||
2% | |||
7 Bx Ex Lx ECI Base Lx Base Px 2010 | |||
$466,987,774 Dalton Utilities Latest Month Px Amount of NRC Minimum/Site Specific: | |||
BWR/PWR MWth Georgia Power Company Oglethorpe Power Corporation Municipal Electric Authority | |||
$106,006,225 | |||
$140,096,332 | |||
$48,598,400 | |||
$107,725,000 Year: | |||
Vogtle (Alvin W.) Nuclear Plant, Unit 2 Docket Number: | |||
Date of Operation: | |||
Latest Month Fx | |||
$513,329,193 Years remaining after annuity Px 50-425 9 | |||
31 Termination of Operations: | |||
2049 1986$ | |||
Day Base Fx Plant name: | |||
Value of Annuity per year (amount/See Annuity Sheet) | |||
Licensee: | |||
$213,413,413 NRC Minimum: | |||
Fx Site Specific: | |||
Total Step 2: | |||
$7,471,804 Years Left in License 38.11 | |||
$8,742,401 Real Rate of Return per year Does Licensee Pass: | |||
YES | |||
$76,299,281 | |||
$0 Trust Fund Balance: | |||
Step 1: | |||
Amount in Trust Fund: | |||
$0 Total Earnings: | |||
$513,329,193 Real Rate of Return per year Total of Steps 1 thru 3: | |||
Number of Annual Payments: | |||
Accumulation: | |||
Step 2: | |||
Earnings Credit: | |||
$241,365,082 Decom Period: | |||
$0 Total Annuity Real Rate of Return per year Total Fund Balance: | |||
$241,365,082 Total Step 1 + Step 2 | |||
$513,329,193 | |||
$38,162,347 Total Earnings for Decom: | |||
Total Annuity: | |||
Step 3: | |||
NO Shortfall: | |||
YES Does Licensee Pass: | |||
Does Licensee Pass: | |||
YES Decom Period: | |||
Total Earnings: | |||
Real Rate of Return per year | |||
$551,491,540 | |||
Datasheet 2 Signature: Michael Purdie, Jo Ann Simpson Date: 07/18/2011 Secondary Review: Kosmas Lois, 8/5/2011 Spreadsheet created by: Aaron Szabo, Shawn Harwell Formulas verified by: Clayton Pittiglio Month: | |||
12 2 | |||
2010 Year: | |||
Vogtle (Alvin W.) Nuclear Plant, Unit 2 Docket Number: | |||
Date of Operation: | |||
50-425 9 | |||
31 Termination of Operations: | |||
2049 Day Plant name: | |||
Owner Georgia Power Company 2.00% | |||
38.11 Oglethorpe Power Corporation 2.00% | |||
Municipal Electric Authority 2.00% | |||
Dalton Utilities 2.00% | |||
0.00% | |||
0.00% | |||
2.00% | |||
7 Earnings Credit: | |||
Step 4: | |||
Shortfall: | |||
NO Real Rate of Return per year Years remaining after annuity | |||
$0 YES | |||
$38,162,347 Total Step 5 Total of Steps 4 thru 6: | |||
$551,491,540 Does Licensee Pass: | |||
Total Earnings: | |||
38.11 0 | |||
$513,329,193 | |||
$0 | |||
$0 Decom Period: | |||
Step 6: | |||
$513,329,193 | |||
#DIV/0! | |||
Does Licensee Pass: | |||
Real Rate of Return per year YES Total Step 4 + Step 5 Total Earnings for Decom: | |||
Decom Period: | |||
Does Licensee Pass: | |||
$513,329,193 YES Real Rate of Return per year Accumulation: | |||
Value of Annuity per year Total Annuity: | |||
Total Annuity Real Rate of Return Number of Annual Payments: | |||
Step 5: | |||
If licensee is granted greater than 2% RRR Trust Fund Balance: | |||
$107,725,000 | |||
$48,598,400 Years Left in License Total Earnings: | |||
$76,299,281 | |||
$8,742,401}} | |||
Latest revision as of 02:21, 13 January 2025
| ML112380020 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/14/2011 |
| From: | Szabo A Division of Inspection and Regional Support |
| To: | |
| Szabo, A L, NRR/DPR, 415-1985 | |
| References | |
| Download: ML112380020 (3) | |
Text
Datasheet 1 Signature: Michael Purdie, Jo Ann Simpson Date: 07/18/2011 Secondary Review: Kosmas Lois, 8/5/2011 Spreadsheet created by: Aaron Szabo, Shawn Harwell Formulas verified by: Clayton Pittiglio 1
2
% Owned: Category:
45.70%
1 30.00%
1 22.70%
1 1.60%
1 3
4 variable1 variable1 variable1 N
N Y
N N
N2 5
6 Any modifications to a licensee's method of providing decommissioning funding assurance? (Y/N) 7 If a change has occurred, the reviewer will document on this sheet that a change has occurred and identify the reviewer who will evaluate the change: (see below) 1 Rates provided are variable because the rates are not consistent throughout the licensee(s) and/or years of operation/decommission (See "Notes" for additional comments).
3 Oglethorpe Power Corporation executed a revised Trust Agreement in August 2010, which was provided to the NRC in March 2010 (ML101090080).
2 Municipal Electric Authority is relying upon a PPA, which was included in the Attachments 2 & 3 of the DFS report.
2 Rates for Oglethorpe could not be determined based upon submitted information.
Licensee:
$107,725,000 Amount in Trust Fund:
Y4 Any material changes to trust agreements? (Y/N)
N
$8,742,401 Post-RAI Rates Determined (Y/N)
Oglethorpe Power Corporation Georgia Power Company Y
$459,684,000 The total amount of dollars accumulated at the end of the appropriate year: (see below)
Y3 Assumptions used in determining rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections: (see below)
Any contracts upon which the licensee is relying? (Y/N)
Schedule of the annual amounts remaining to be collected: (provided/none)
Rate of Return on Earnings Allowed through Decom (Y/N)
Rate(s) of Other Factors
$241,365,082 Real Rate of Return PUC Verified (Y/N)
$76,299,281 Total Trust Fund Balance Plant name:
Vogtle (Alvin W.) Nuclear Plant, Unit 2 50-425 RAI Needed (Y/N)
PUC Verified (Y/N)
$48,598,400 none Docket Number:
Did the licensee identify the amount of estimated radiological funds? (Y/N)
The minimum financial assurance (MFA) estimate pursuant to 10 CFR 50.75(b) & (c):
Escalation Rate Allowed through Decom (Y/N)
Municipal Electric Authority Dalton Utilities
Datasheet 2 Signature: Michael Purdie, Jo Ann Simpson Date: 07/18/2011 Secondary Review: Kosmas Lois, 8/5/2011 Spreadsheet created by: Aaron Szabo, Shawn Harwell Formulas verified by: Clayton Pittiglio Month:
12 2
PWR 3625
$105,000,000 112.8 1.98 0.65 2.23 1.675 191.3 114.2 3.074 252.1 82.0 0.13 2.263 0.22 12.28
% Owned:
Category 45.70%
1 30.00%
1 22.70%
1 1.60%
1 2%
38.11 2%
2%
2%
7 Bx Ex Lx ECI Base Lx Base Px 2010
$466,987,774 Dalton Utilities Latest Month Px Amount of NRC Minimum/Site Specific:
BWR/PWR MWth Georgia Power Company Oglethorpe Power Corporation Municipal Electric Authority
$106,006,225
$140,096,332
$48,598,400
$107,725,000 Year:
Vogtle (Alvin W.) Nuclear Plant, Unit 2 Docket Number:
Date of Operation:
Latest Month Fx
$513,329,193 Years remaining after annuity Px 50-425 9
31 Termination of Operations:
2049 1986$
Day Base Fx Plant name:
Value of Annuity per year (amount/See Annuity Sheet)
Licensee:
$213,413,413 NRC Minimum:
Fx Site Specific:
Total Step 2:
$7,471,804 Years Left in License 38.11
$8,742,401 Real Rate of Return per year Does Licensee Pass:
YES
$76,299,281
$0 Trust Fund Balance:
Step 1:
Amount in Trust Fund:
$0 Total Earnings:
$513,329,193 Real Rate of Return per year Total of Steps 1 thru 3:
Number of Annual Payments:
Accumulation:
Step 2:
Earnings Credit:
$241,365,082 Decom Period:
$0 Total Annuity Real Rate of Return per year Total Fund Balance:
$241,365,082 Total Step 1 + Step 2
$513,329,193
$38,162,347 Total Earnings for Decom:
Total Annuity:
Step 3:
NO Shortfall:
YES Does Licensee Pass:
Does Licensee Pass:
YES Decom Period:
Total Earnings:
Real Rate of Return per year
$551,491,540
Datasheet 2 Signature: Michael Purdie, Jo Ann Simpson Date: 07/18/2011 Secondary Review: Kosmas Lois, 8/5/2011 Spreadsheet created by: Aaron Szabo, Shawn Harwell Formulas verified by: Clayton Pittiglio Month:
12 2
2010 Year:
Vogtle (Alvin W.) Nuclear Plant, Unit 2 Docket Number:
Date of Operation:
50-425 9
31 Termination of Operations:
2049 Day Plant name:
Owner Georgia Power Company 2.00%
38.11 Oglethorpe Power Corporation 2.00%
Municipal Electric Authority 2.00%
Dalton Utilities 2.00%
0.00%
0.00%
2.00%
7 Earnings Credit:
Step 4:
Shortfall:
NO Real Rate of Return per year Years remaining after annuity
$0 YES
$38,162,347 Total Step 5 Total of Steps 4 thru 6:
$551,491,540 Does Licensee Pass:
Total Earnings:
38.11 0
$513,329,193
$0
$0 Decom Period:
Step 6:
$513,329,193
- DIV/0!
Does Licensee Pass:
Real Rate of Return per year YES Total Step 4 + Step 5 Total Earnings for Decom:
Decom Period:
Does Licensee Pass:
$513,329,193 YES Real Rate of Return per year Accumulation:
Value of Annuity per year Total Annuity:
Total Annuity Real Rate of Return Number of Annual Payments:
Step 5:
If licensee is granted greater than 2% RRR Trust Fund Balance:
$107,725,000
$48,598,400 Years Left in License Total Earnings:
$76,299,281
$8,742,401