ML12046A837: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ES-301                           Control Room/In-Plant Systems Outline                             Form ES-301-2 Facility: Clinton                                                       Date of Examination: 8/22/2011 Exam Level: RO           SRO-I     SRO-U                             Operating Test Number: 2011-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
{{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title                                       Type Code*
System / JPM Title Type Code*
Function
Safety Function
: a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow                           M,S             1 speed
: a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow speed M,S 1
: b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System                               A,D,EN,L,S         2
: b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System A,D,EN,L,S 2
: c. 239001 A4.01 4.2 / JPM 447 Perform RPS MSIV Channel Functional                             D,S           3
: c. 239001 A4.01 4.2 / JPM 447 Perform RPS MSIV Channel Functional D,S 3
: d. 203000 A4.02 4.1 / JPM 440 SX Injection Through RHR B                                   A,N,L,S           4
: d. 203000 A4.02 4.1 / JPM 440 SX Injection Through RHR B A,N,L,S 4
: e. 223002 A4.01 3.6 / JPM 452 Verify a Group 3 Isolation                                 A,N,EN,L,S         5
: e. 223002 A4.01 3.6 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
: f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power                             A,D,P,S           6
: f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6
: g. 212000 A4.14 3.8 / JPM 449 Reset a Reactor SCRAM per CPS No.                             D,L,S           7 4100.01
: g. 212000 A4.14 3.8 / JPM 449 Reset a Reactor SCRAM per CPS No.
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process                       A,D,S           9 Radiation Monitors In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
4100.01 D,L,S 7
: i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads                   D,R            6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9
: j. 295016 AA1.07 4.2 / JPM 454 RSP - Div 1 LPCI Operation                                 E,L,N,R,S         7
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: k. 286000 2.4.25 3.3 / JPM 455 Emergency Initiation of the Div 2 DG Room                   A,E,N,R           8 CO2 System
: i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
  @      All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
: j. 295016 AA1.07 4.2 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7
* Type Codes                                   Criteria for RO / SRO-I / SRO-U (A)lternate path                                                     4-6 /  4-6 / 2-3 (C)ontrol room (D)irect from bank                                                   <9 /    <8    / <4 (E)mergency or abnormal in-plant                                     >1 /    >1    / >1 (EN)gineered safety feature                                           - /      -    / > 1 (control room system (L)ow-Power / Shutdown                                               >1 /    >1    / >1 (N)ew or (M)odified from bank including 1(A)                         >2 /   >2     / >1 (P)revious 2 exams                                                    <3/     <3     / < 2 (randomly selected)
: k. 286000 2.4.25 3.3 / JPM 455 Emergency Initiation of the Div 2 DG Room CO2 System A,E,N,R 8
(R)CA                                                                >1 /   >1     / >1 (S)imulator ES-301, Page 23 of 27
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /
4-6 / 2-3
< 9 /
< 8 / < 4
> 1 /
> 1 / > 1
- /
/ > 1 (control room system
> 1 /
> 1 / > 1
> 2 /  
> 2 / > 1  
< 3 /  
< 3 / < 2 (randomly selected)  
> 1 /  
> 1 / > 1 ES-301, Page 23 of 27  


ES-301                           Control Room/In-Plant Systems Outline                             Form ES-301-2 Facility: Clinton                                                       Date of Examination: 8/22/2011 Exam Level: RO           SRO-I     SRO-U                             Operating Test Number: 2011-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title                                       Type Code*
System / JPM Title Type Code*
Function
Safety Function
: a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow                           M,S             1 speed
: a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow speed M,S 1
: b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System                               A,D,EN,L,S         2
: b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System A,D,EN,L,S 2
: c. 239001 A4.01 4.0 / JPM 447 Perform RPS MSIV Channel Functional                             D,S           3
: c. 239001 A4.01 4.0 / JPM 447 Perform RPS MSIV Channel Functional D,S 3
: d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B                                   A,N,L,S           4
: d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A,N,L,S 4
: e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation                                 A,N,EN,L,S         5
: e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
: f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power                             A,D,P,S           6 g.
: f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process                       A,D,S           9 Radiation Monitors In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: g.
: i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads                   D,R            6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9
: j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation                                 E,L,N,R,S         7
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: k. 286000 2.4.25 3.7 / JPM 455 Emergency Initiation of the Div 2 DG Room                   A,E,N,R           8 CO2 System
: i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
  @      All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
: j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7
* Type Codes                                   Criteria for RO / SRO-I / SRO-U (A)lternate path                                                     4-6 /  4-6 / 2-3 (C)ontrol room (D)irect from bank                                                   <9 /    <8    / <4 (E)mergency or abnormal in-plant                                     >1 /    >1    / >1 (EN)gineered safety feature                                           - /      -    / > 1 (control room system (L)ow-Power / Shutdown                                               >1 /    >1    / >1 (N)ew or (M)odified from bank including 1(A)                         >2 /   >2     / >1 (P)revious 2 exams                                                    <3/     <3     / < 2 (randomly selected)
: k. 286000 2.4.25 3.7 / JPM 455 Emergency Initiation of the Div 2 DG Room CO2 System A,E,N,R 8
(R)CA                                                                >1 /   >1     / >1 (S)imulator ES-301, Page 23 of 27
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /
4-6 / 2-3
< 9 /
< 8 / < 4
> 1 /
> 1 / > 1
- /
/ > 1 (control room system
> 1 /
> 1 / > 1
> 2 /  
> 2 / > 1  
< 3 /  
< 3 / < 2 (randomly selected)  
> 1 /  
> 1 / > 1 ES-301, Page 23 of 27  


ES-301                           Control Room/In-Plant Systems Outline                           Form ES-301-2 Facility: Clinton                                                       Date of Examination: 8/22/2011 Exam Level: RO           SRO-I     SRO-U                             Operating Test Number: 2011-301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title                                       Type Code*
System / JPM Title Type Code*
Function a.
Safety Function
b.
: a.
c.
: b.
: d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B                                   A,N,L,S           4
: c.
: e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation                                 A,N,EN,L,S         5 f.
: d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A,N,L,S 4
g.
: e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process                       A,D,S           9 Radiation Monitors In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: f.
: i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads                   D,R            6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER
: g.
: j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation                                 E,L,N,R,S         7 k.
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9
  @      All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
* Type Codes                                   Criteria for RO / SRO-I / SRO-U (A)lternate path                                                     4-6 /  4-6 / 2-3 (C)ontrol room (D)irect from bank                                                   <9 /    <8    / <4 (E)mergency or abnormal in-plant                                     >1 /    >1    / >1 (EN)gineered safety feature                                           - /      -    / > 1 (control room system (L)ow-Power / Shutdown                                               >1 /    >1    / >1 (N)ew or (M)odified from bank including 1(A)                         >2 /   >2     / >1 (P)revious 2 exams                                                    <3/     <3     / < 2 (randomly selected)
: i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
(R)CA                                                                >1 /   >1     / >1 (S)imulator ES-301, Page 23 of 27}}
: j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7
: k.
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /
4-6 / 2-3
< 9 /
< 8 / < 4
> 1 /
> 1 / > 1
- /
/ > 1 (control room system
> 1 /
> 1 / > 1
> 2 /  
> 2 / > 1  
< 3 /  
< 3 / < 2 (randomly selected)  
> 1 /  
> 1 / > 1 ES-301, Page 23 of 27}}

Latest revision as of 20:02, 12 January 2025

2011 Clinton Power Station Initial License Examination Revised Forms ES-301-2
ML12046A837
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/29/2011
From: Bielby M
Operations Branch III
To:
Exelon Nuclear
Shared Package
ML11354A098 List:
References
ES-301, ES-301-2
Download: ML12046A837 (3)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow speed M,S 1
b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System A,D,EN,L,S 2
c. 239001 A4.01 4.2 / JPM 447 Perform RPS MSIV Channel Functional D,S 3
d. 203000 A4.02 4.1 / JPM 440 SX Injection Through RHR B A,N,L,S 4
e. 223002 A4.01 3.6 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6
g. 212000 A4.14 3.8 / JPM 449 Reset a Reactor SCRAM per CPS No.

4100.01 D,L,S 7

h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
j. 295016 AA1.07 4.2 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7
k. 286000 2.4.25 3.3 / JPM 455 Emergency Initiation of the Div 2 DG Room CO2 System A,E,N,R 8

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /

4-6 / 2-3

< 9 /

< 8 / < 4

> 1 /

> 1 / > 1

- /

/ > 1 (control room system

> 1 /

> 1 / > 1

> 2 /

> 2 / > 1

< 3 /

< 3 / < 2 (randomly selected)

> 1 /

> 1 / > 1 ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow speed M,S 1
b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System A,D,EN,L,S 2
c. 239001 A4.01 4.0 / JPM 447 Perform RPS MSIV Channel Functional D,S 3
d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A,N,L,S 4
e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6
g.
h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7
k. 286000 2.4.25 3.7 / JPM 455 Emergency Initiation of the Div 2 DG Room CO2 System A,E,N,R 8

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /

4-6 / 2-3

< 9 /

< 8 / < 4

> 1 /

> 1 / > 1

- /

/ > 1 (control room system

> 1 /

> 1 / > 1

> 2 /

> 2 / > 1

< 3 /

< 3 / < 2 (randomly selected)

> 1 /

> 1 / > 1 ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a.
b.
c.
d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A,N,L,S 4
e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
f.
g.
h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7
k.

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /

4-6 / 2-3

< 9 /

< 8 / < 4

> 1 /

> 1 / > 1

- /

/ > 1 (control room system

> 1 /

> 1 / > 1

> 2 /

> 2 / > 1

< 3 /

< 3 / < 2 (randomly selected)

> 1 /

> 1 / > 1 ES-301, Page 23 of 27