{{#Wiki_filter:ES-301 Control Room/In
{{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I   SRO-U Operating Test Number:
2011-301   Control Room Systems
@ (8 for RO); (7 for SRO
-I); (2 or 3 for SRO
-U, including 1 ESF)
System / JPM Title Type Code*
System / JPM Title Type Code*
Safety Function a. 202001 A 4.0 1 3.7 / JPM 448 Transfer RR pumps from Fast to Slow speed M , S 1 b. 217000 A4.04 3.6 / JPM 2 04 Manually Startup RCIC System A, D, EN,L,S 2 c. 239001 A4.01 4.2 / JPM 447 Perform RPS MSIV Channel Functional D,S 3 d. 203000 A4.02 4.1 / JPM 440 SX Injection Through RHR B A, N, L, S 4 e. 22 3 00 2 A4.0 1 3.6 / JPM 45 2 Verify a Group 3 Isolation A, N ,EN, L, S 5 f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A, D, P ,S 6 g. 212000 A4.14 3.8 / JPM 449 Reset a Reactor SCRAM per CPS No. 4100.01 D,L, S 7 h. 2 72000 A 1.0 1 3.2 / JPM 453 Shifting O ff-G as Post Treatment Process Radiation Monitors A, D ,S 9 In-Plant Systems
Safety Function
@ (3 for RO); (3 for SRO
: a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow speed M,S 1
-I); (3 or 2 for SRO
: b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System A,D,EN,L,S 2
-U) i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6 j. 295016 AA1.07 4.2 / JPM 454 RSP  
: c. 239001 A4.01 4.2 / JPM 447 Perform RPS MSIV Channel Functional D,S 3
- Div 1 LPCI Operation E,L,N,R,S 7 k. 286000 2.4.25 3.3 / JPM 455 Emergency Initiation of the Div 2 DG Room CO2 System A ,E,N, R 8 @ All RO and SRO
: d. 203000 A4.02 4.1 / JPM 440 SX Injection Through RHR B A,N,L,S 4
-I control room (and in
: e. 223002 A4.01 3.6 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
-plant) systems must be different and serve different safety functions; all 5 SRO
: f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6
-U systems must serve different safety functions; in
: g. 212000 A4.14 3.8 / JPM 449 Reset a Reactor SCRAM per CPS No.
-plant systems and functions may overlap those tested in the control room.
4100.01 D,L,S 7
* Type Codes Criteria for RO / SRO
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
: i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3   < 9 / < 8 / < 4 > 1 / > 1 / > 1   - /   - / > 1 (control room system
: j. 295016 AA1.07 4.2 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7
  > 1 / > 1 / > 1 > 2 / > 2 / > 1 < 3 / < 3 / < 2 (randomly selected)
: k. 286000 2.4.25 3.3 / JPM 455 Emergency Initiation of the Div 2 DG Room CO2 System A,E,N,R 8
  > 1 / > 1 / > 1   ES-301, Page 23 of 27 ES-301 Control Room/In
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I   SRO-U Operating Test Number:
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
2011-301   Control Room Systems
(P)revious 2 exams (R)CA (S)imulator 4-6 /
@ (8 for RO); (7 for SRO
4-6 / 2-3  
-I); (2 or 3 for SRO
< 9 /  
-U, including 1 ESF)
< 8 / < 4  
> 1 /  
> 1 / > 1  
- /  
/ > 1 (control room system  
> 1 /  
> 1 / > 1  
> 2 /  
> 2 / > 1  
< 3 /  
< 3 / < 2 (randomly selected)  
> 1 /  
> 1 / > 1 ES-301, Page 23 of 27  
 
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
System / JPM Title Type Code*
Safety Function a. 202001 A 4.0 1 3.7 / JPM 448 Transfer RR pumps from Fast to Slow speed M , S 1 b. 217000 A4.04 3.6 / JPM 2 04 Manually Startup RCIC System A, D, EN,L,S 2 c. 239001 A4.01 4.0 / JPM 447 Perform RPS MSIV Channel Functional D,S 3 d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A, N, L, S 4 e. 223002 A4.01 3.
Safety Function
5 / JPM 45 2 Verify a Group 3 Isolation A,N,EN,L,S 5 f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A, D, P ,S 6 g.                   h. 272000 A1.01 3.2 / JPM 453 Shifting O ff-Gas Post Treatment Process Radiation Monitors A, D ,S 9 In-Plant Systems
: a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow speed M,S 1
@ (3 for RO); (3 for SRO
: b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System A,D,EN,L,S 2
-I); (3 or 2 for SRO
: c. 239001 A4.01 4.0 / JPM 447 Perform RPS MSIV Channel Functional D,S 3
-U) i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6 j. 295016 AA1.07 4.
: d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A,N,L,S 4
3 / JPM 454 RSP  
: e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
- Div 1 LPCI Operation E,L,N,R,S 7 k. 286000 2.4.25 3.
: f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6
7 / JPM 455 Emergency Initiation of the Div 2 DG Room CO2 System A,E,N,R 8 @ All RO and SRO
: g.
-I control room (and in
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9
-plant) systems must be different and serve different safety functions; all 5 SRO
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
-U systems must serve different safety functions; in
: i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
-plant systems and functions may overlap those tested in the control room.
: j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7
* Type Cod es Criteria for RO / SRO
: k. 286000 2.4.25 3.7 / JPM 455 Emergency Initiation of the Div 2 DG Room CO2 System A,E,N,R 8
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3   < 9 / < 8 / < 4 > 1 / > 1 / > 1   - /   - / > 1 (control room system
(P)revious 2 exams (R)CA (S)imulator 4-6 /
  > 1 / > 1 / > 1 > 2 / > 2 / > 1 < 3 / < 3 / < 2 (randomly selected)
4-6 / 2-3  
  > 1 / > 1 / > 1   ES-301, Page 23 of 27
< 9 /  
< 8 / < 4  
> 1 /  
> 1 / > 1  
- /  
/ > 1 (control room system  
> 1 /  
> 1 / > 1  
> 2 /  
> 2 / > 1  
< 3 /  
< 3 / < 2 (randomly selected)  
> 1 /  
> 1 / > 1 ES-301, Page 23 of 27  


ES-301 Control Room/In
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I   SRO-U Operating Test Number:
2011-301   Control Room Systems
@ (8 for RO); (7 for SRO
-I); (2 or 3 for SRO
-U, including 1 ESF)
System / JPM Title Type Code*
System / JPM Title Type Code*
Safety Function a.                   b.                   c.                   d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A,N,L,S 4 e. 223002 A4.01 3.5 / JPM 45 2 Verify a Group 3 Isolation A,N,EN,L,S 5 f.                   g.                   h. 272000 A1.01 3.2 / JPM 453 Shifting Off
Safety Function
-Gas Post Treatment Process Radiation Monitors A,D,S 9 In-Plant Systems
: a.
@ (3 for RO); (3 for SRO
: b.
-I); (3 or 2 for SRO
: c.
-U) i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6 j. 295016 AA1.07 4.3 / JPM 454 RSP  
: d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A,N,L,S 4
- Div 1 LPCI Operation E,L,N,R,S 7 k.                   @ All RO and SRO
: e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
-I control room (and in
: f.
-plant) systems must be different and serve different safety functions; all 5 SRO
: g.
-U systems must serve different safety functions; in
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9
-plant systems and functions may overlap those tested in the control room.
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
* Type Codes Criteria for RO / SRO
: i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
: j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3   < 9 / < 8 / < 4 > 1 / > 1 / > 1   - /   - / > 1 (control room system
: k.
  > 1 / > 1 / > 1 > 2 / > 2 / > 1 < 3 / < 3 / < 2 (randomly selected)
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  > 1 / > 1 / > 1   ES-301, Page 23 of 27}}
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /
4-6 / 2-3  
< 9 /  
< 8 / < 4  
> 1 /  
> 1 / > 1  
- /  
/ > 1 (control room system  
> 1 /  
> 1 / > 1  
> 2 /  
> 2 / > 1  
< 3 /  
< 3 / < 2 (randomly selected)  
> 1 /  
> 1 / > 1 ES-301, Page 23 of 27}}

Latest revision as of 20:02, 12 January 2025

2011 Clinton Power Station Initial License Examination Revised Forms ES-301-2
ML12046A837
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/29/2011
From: Bielby M
Operations Branch III
To:
Exelon Nuclear
Shared Package
ML11354A098 List:
References
ES-301, ES-301-2
Download: ML12046A837 (3)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow speed M,S 1
b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System A,D,EN,L,S 2
c. 239001 A4.01 4.2 / JPM 447 Perform RPS MSIV Channel Functional D,S 3
d. 203000 A4.02 4.1 / JPM 440 SX Injection Through RHR B A,N,L,S 4
e. 223002 A4.01 3.6 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6
g. 212000 A4.14 3.8 / JPM 449 Reset a Reactor SCRAM per CPS No.

4100.01 D,L,S 7

h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
j. 295016 AA1.07 4.2 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7
k. 286000 2.4.25 3.3 / JPM 455 Emergency Initiation of the Div 2 DG Room CO2 System A,E,N,R 8

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /

4-6 / 2-3

< 9 /

< 8 / < 4

> 1 /

> 1 / > 1

- /

/ > 1 (control room system

> 1 /

> 1 / > 1

> 2 /

> 2 / > 1

< 3 /

< 3 / < 2 (randomly selected)

> 1 /

> 1 / > 1 ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow speed M,S 1
b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System A,D,EN,L,S 2
c. 239001 A4.01 4.0 / JPM 447 Perform RPS MSIV Channel Functional D,S 3
d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A,N,L,S 4
e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6
g.
h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7
k. 286000 2.4.25 3.7 / JPM 455 Emergency Initiation of the Div 2 DG Room CO2 System A,E,N,R 8

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /

4-6 / 2-3

< 9 /

< 8 / < 4

> 1 /

> 1 / > 1

- /

/ > 1 (control room system

> 1 /

> 1 / > 1

> 2 /

> 2 / > 1

< 3 /

< 3 / < 2 (randomly selected)

> 1 /

> 1 / > 1 ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a.
b.
c.
d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A,N,L,S 4
e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
f.
g.
h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7
k.

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /

4-6 / 2-3

< 9 /

< 8 / < 4

> 1 /

> 1 / > 1

- /

/ > 1 (control room system

> 1 /

> 1 / > 1

> 2 /

> 2 / > 1

< 3 /

< 3 / < 2 (randomly selected)

> 1 /

> 1 / > 1 ES-301, Page 23 of 27