ML12171A151: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (5 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML12171A151 | | number = ML12171A151 | ||
| issue date = 08/12/2011 | | issue date = 08/12/2011 | ||
| title = | | title = Unit 2 - Final Safety Analysis Report (Fsar), Amendment 105, Figure 2.5-589 | ||
| author name = | | author name = | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority | ||
| Line 13: | Line 13: | ||
| page count = 1 | | page count = 1 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:,- | |||
I MOVEMENT 0 | |||
MOVEMENT 0 | |||
MOVEMENT 0 | |||
7 MOVEMENT 0 | |||
\\ | |||
H FINAL SAFETY NOTEE: A: COMPLETION DATE IS THE FINISH DATE OF THE MAJOR STRUCTURAL CONCRETE. | |||
Added by Amendment 50 FIGURE 2.5-5119}} | |||
Latest revision as of 01:30, 12 January 2025
| ML12171A151 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 08/12/2011 |
| From: | Tennessee Valley Authority |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML12171A151 (1) | |
Text
,-
I MOVEMENT 0
MOVEMENT 0
MOVEMENT 0
7 MOVEMENT 0
\\
H FINAL SAFETY NOTEE: A: COMPLETION DATE IS THE FINISH DATE OF THE MAJOR STRUCTURAL CONCRETE.
Added by Amendment 50 FIGURE 2.5-5119