{{#Wiki_filter:R.E. Ginna Nuclear Power Plant Development of Evacuation Time Estimates Work performed for Constellation Energy Nuclear Group, LLC (CENG), by:
{{#Wiki_filter:}}
KLD Engineering, P.C.
43 Corporate Drive Hauppauge, NY 11788 mailto:kweinisch@kldcompanies.com November 2012                  Final Report, Rev. 1                KLD TR - 518
 
Table of Contents 1    INTRODUCTION .................................................................................................................................. 11 1.1    Overview of the ETE Process...................................................................................................... 11 1.2    The R.E. Ginna Nuclear Power Plant .......................................................................................... 13 1.3    Preliminary Activities ................................................................................................................. 15 1.4    Comparison with Prior ETE Study .............................................................................................. 19 2 STUDY ESTIMATES AND ASSUMPTIONS............................................................................................. 21 2.1    Data Estimates ........................................................................................................................... 21 2.2    Study Methodological Assumptions .......................................................................................... 22 2.3    Study Assumptions ..................................................................................................................... 25 3 DEMAND ESTIMATION ....................................................................................................................... 31 3.1    Permanent Residents ................................................................................................................. 32 3.2    Shadow Population .................................................................................................................... 37 3.3    Transient Population ................................................................................................................ 310 3.4    Employees ................................................................................................................................ 313 3.5    Medical Facilities ...................................................................................................................... 317 3.6    Total Demand in Addition to Permanent Population .............................................................. 317 3.7    Special Event ............................................................................................................................ 317 3.8    Summary of Demand ............................................................................................................... 319 4 ESTIMATION OF HIGHWAY CAPACITY................................................................................................ 41 4.1    Capacity Estimations on Approaches to Intersections .............................................................. 42 4.2    Capacity Estimation along Sections of Highway ........................................................................ 44 4.3    Application to the R.E. Ginna Nuclear Power Plant Study Area................................................. 46 4.3.1    TwoLane Roads ................................................................................................................. 46 4.3.2    MultiLane Highway ........................................................................................................... 46 4.3.3    Freeways ............................................................................................................................ 47 4.3.4    Intersections ...................................................................................................................... 48 4.4    Simulation and Capacity Estimation .......................................................................................... 48 5    ESTIMATION OF TRIP GENERATION TIME .......................................................................................... 51 5.1    Background ................................................................................................................................ 51 5.2    Fundamental Considerations ..................................................................................................... 53 5.3    Estimated Time Distributions of Activities Preceding Event 5 ................................................... 56 5.4    Calculation of Trip Generation Time Distribution .................................................................... 512 5.4.1    Statistical Outliers ............................................................................................................ 513 5.4.2    Staged Evacuation Trip Generation ................................................................................. 517 5.4.3    Trip Generation for Waterways and Recreational Areas ................................................. 518 6    DEMAND ESTIMATION FOR EVACUATION SCENARIOS ..................................................................... 61 7    GENERAL POPULATION EVACUATION TIME ESTIMATES (ETE) .......................................................... 71 7.1    Voluntary Evacuation and Shadow Evacuation ......................................................................... 71 7.2    Staged Evacuation ...................................................................................................................... 71 7.3    Patterns of Traffic Congestion during Evacuation ..................................................................... 72 R.E. Ginna Nuclear Power Plant                                          i                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                            Rev. 1
 
7.4      Evacuation Rates ........................................................................................................................ 73 7.5      Evacuation Time Estimate (ETE) Results .................................................................................... 74 7.6      Staged Evacuation Results ......................................................................................................... 75 7.7      Guidance on Using ETE Tables ................................................................................................... 75 8 TRANSITDEPENDENT AND SPECIAL FACILITY EVACUATION TIME ESTIMATES ................................. 81 8.1      Transit Dependent People Demand Estimate ............................................................................ 82 8.2      School Population - Transit Demand ......................................................................................... 84 8.3      Special Facility Demand ............................................................................................................. 84 8.4      Evacuation Time Estimates for Transit Dependent People ....................................................... 85 8.5      Special Needs Population......................................................................................................... 810 9 TRAFFIC MANAGEMENT STRATEGY ................................................................................................... 91 10      EVACUATION ROUTES .................................................................................................................. 101 11      SURVEILLANCE OF EVACUATION OPERATIONS ........................................................................... 111 12      CONFIRMATION TIME .................................................................................................................. 121 A. GLOSSARY OF TRAFFIC ENGINEERING TERMS .................................................................................. A1 B. DYNAMIC TRAFFIC ASSIGNMENT AND DISTRIBUTION MODEL ......................................................... B1 C. DYNEV TRAFFIC SIMULATION MODEL ............................................................................................... C1 C.1      Methodology .............................................................................................................................. C5 C.1.1      The Fundamental Diagram ................................................................................................. C5 C.1.2      The Simulation Model ........................................................................................................ C5 C.1.3      Lane Assignment .............................................................................................................. C13 C.2      Implementation ....................................................................................................................... C13 C.2.1      Computational Procedure ................................................................................................ C13 C.2.2      Interfacing with Dynamic Traffic Assignment (DTRAD) ................................................... C16 D. DETAILED DESCRIPTION OF STUDY PROCEDURE .............................................................................. D1 E. SPECIAL FACILITY DATA ...................................................................................................................... E1 F. TELEPHONE SURVEY ........................................................................................................................... F1 F.1      Introduction ............................................................................................................................... F1 F.2      Survey Instrument and Sampling Plan ....................................................................................... F2 F.3      Survey Results ............................................................................................................................ F3 F.3.1 Household Demographic Results ........................................................................................... F3 F.3.2    Evacuation Response ............................................................................................................. F8 F.3.3    Time Distribution Results ..................................................................................................... F10 F.4      Conclusions .............................................................................................................................. F13 G. TRAFFIC MANAGEMENT PLAN .......................................................................................................... G1 G.1      Traffic Control Points ................................................................................................................ G1 G.2      Access Control Points ................................................................................................................ G1 H EVACUATION REGIONS ..................................................................................................................... H1 J. REPRESENTATIVE INPUTS TO AND OUTPUTS FROM THE DYNEV II SYSTEM ..................................... J1 R.E. Ginna Nuclear Power Plant                                          ii                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                            Rev. 1
 
K. EVACUATION ROADWAY NETWORK .................................................................................................. K1 L. ERPA BOUNDARIES ............................................................................................................................ L1 M.      EVACUATION SENSITIVITY STUDIES ............................................................................................. M1 M.1 Effect of Changes in Trip Generation Times ............................................................................ M1 M.2 Effect of Changes in the Number of People in the Shadow Region Who Relocate ................. M2 M.3 Effect of Changes in EPZ Resident Population ......................................................................... M3 N. ETE CRITERIA CHECKLIST ................................................................................................................... N1 Note: Appendix I intentionally skipped R.E. Ginna Nuclear Power Plant                                    iii                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                      Rev. 1
 
List of Figures Figure 11. R.E. Ginna Nuclear Power Plant Location ............................................................................... 14 Figure 12. Ginna LinkNode Analysis Network......................................................................................... 17 Figure 21. Voluntary Evacuation Methodology ....................................................................................... 24 Figure 31. R.E. Ginna Nuclear Power Plant EPZ ....................................................................................... 33 Figure 32. Permanent Resident Population by Sector ............................................................................. 35 Figure 33. Permanent Resident Vehicles by Sector ................................................................................. 36 Figure 34. Shadow Population by Sector ................................................................................................. 38 Figure 35. Shadow Vehicles by Sector ..................................................................................................... 39 Figure 36. Transient Population by Sector............................................................................................. 311 Figure 37. Transient Vehicles by Sector ................................................................................................. 312 Figure 38. Employee Population by Sector ............................................................................................ 315 Figure 39. Employee Vehicles by Sector ................................................................................................ 316 Figure 41. Fundamental Diagrams ............................................................................................................ 49 Figure 51. Events and Activities Preceding the Evacuation Trip .............................................................. 55 Figure 52. Evacuation Mobilization Activities ........................................................................................ 511 Figure 53. Comparison of Data Distribution and Normal Distribution....................................................... 515 Figure 54. Comparison of Trip Generation Distributions....................................................................... 520 Figure 55. Comparison of Staged and Unstaged Trip Generation Distributions in the 2 to 5 Mile Region ...................................................................................................................................................... 522 Figure 61. Ginna EPZ ERPAs ..................................................................................................................... 64 Figure 71. Voluntary Evacuation Methodology ..................................................................................... 714 Figure 72. R.E. Ginna Nuclear Power Plant Shadow Region .................................................................. 715 Figure 73. Congestion Patterns at 30 Minutes after the Advisory to Evacuate .................................... 716 Figure 74. Congestion Patterns at 1 Hour after the Advisory to Evacuate ............................................ 717 Figure 75. Congestion Patterns at 2 Hours after the Advisory to Evacuate .......................................... 718 Figure 76. Congestion Patterns at 2 Hours and 30 Minutes after the Advisory to Evacuate ................ 719 Figure 77. Congestion Patterns at 3 Hours and 10 Minutes after the Advisory to Evacuate ................ 720 Figure 78. Evacuation Time Estimates  Scenario 1 for Region R03 ...................................................... 721 Figure 79. Evacuation Time Estimates  Scenario 2 for Region R03 ...................................................... 721 Figure 710. Evacuation Time Estimates  Scenario 3 for Region R03 .................................................... 722 Figure 711. Evacuation Time Estimates  Scenario 4 for Region R03 .................................................... 722 Figure 712. Evacuation Time Estimates  Scenario 5 for Region R03 .................................................... 723 Figure 713. Evacuation Time Estimates  Scenario 6 for Region R03 .................................................... 723 Figure 714. Evacuation Time Estimates  Scenario 7 for Region R03 .................................................... 724 Figure 715. Evacuation Time Estimates  Scenario 8 for Region R03 .................................................... 724 Figure 716. Evacuation Time Estimates  Scenario 9 for Region R03 .................................................... 725 Figure 717. Evacuation Time Estimates  Scenario 10 for Region R03 .................................................. 725 Figure 718. Evacuation Time Estimates  Scenario 11 for Region R03 .................................................. 726 Figure 719. Evacuation Time Estimates  Scenario 12 for Region R03 .................................................. 726 Figure 720. Evacuation Time Estimates  Scenario 13 for Region R03 .................................................. 727 Figure 721. Evacuation Time Estimates  Scenario 14 for Region R03 .................................................. 727 Figure 81. Chronology of Transit Evacuation Operations ...................................................................... 811 Figure 82. Monroe County Transit Dependent Bus Routes ................................................................... 812 Figure 83. Wayne County Transit Dependent Bus Routes...................................................................... 813 Figure 101. General Population Reception Centers and School Receiving Locations ........................... 102 R.E. Ginna Nuclear Power Plant                                                iv                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                                    Rev. 1
 
Figure 102. Evacuation Route Map ........................................................................................................ 103 Figure B1. Flow Diagram of SimulationDTRAD Interface........................................................................ B5 Figure C1. Representative Analysis Network ........................................................................................... C4 Figure C2. Fundamental Diagrams ........................................................................................................... C6 Figure C3. A UNIT Problem Configuration with t1 > 0 .............................................................................. C7 Figure C4. Flow of Simulation Processing (See Glossary: Table C3) .................................................... C15 Figure D1. Flow Diagram of Activities ..................................................................................................... D5 Figure E1. Monroe County Schools within the EPZ.................................................................................. E8 Figure E2. Wayne County Schools within the EPZ .................................................................................... E9 Figure E3. Preschools within the EPZ ..................................................................................................... E10 Figure E4. Medical Facilities within the EPZ .......................................................................................... E11 Figure E5. Major Employers within the EPZ ........................................................................................... E12 Figure E6. Recreational Areas within the EPZ ........................................................................................ E13 Figure E7. Lodging within the EPZ .......................................................................................................... E14 Figure F1. Household Size in the EPZ ....................................................................................................... F3 Figure F2. Household Vehicle Availability ................................................................................................ F4 Figure F3. Vehicle Availability  1 to 5 Person Households ...................................................................... F5 Figure F4. Vehicle Availability  6 to 9+ Person Households .................................................................... F5 Figure F5. Household Ridesharing Preference......................................................................................... F6 Figure F6. Commuters in Households in the EPZ ..................................................................................... F7 Figure F7. Modes of Travel in the EPZ ..................................................................................................... F8 Figure F8. Number of Vehicles Used for Evacuation ............................................................................... F9 Figure F9. Households Evacuating with Pets ........................................................................................... F9 Figure F10. Time Required to Prepare to Leave Work/School .............................................................. F11 Figure F12. Work to Home Travel Time ................................................................................................. F11 Figure F12. Time to Prepare Home for Evacuation................................................................................ F12 Figure F13. Time to Clear Driveway of 6"8" of Snow ........................................................................... F13 Figure G1. Traffic Control Points for the R.E. Ginna Nuclear Power Plant ............................................. G3 Figure G2. Intersection of Shoecraft Road and State Road .................................................................... G4 Figure G3. Intersection of Shoecraft Road and Plank Road..................................................................... G5 Figure H1. Region R01 ............................................................................................................................. H4 Figure H2. Region R02 ............................................................................................................................. H5 Figure H3. Region R03 ............................................................................................................................. H6 Figure H4. Region R04.............................................................................................................................. H7 Figure H5. Region R05.............................................................................................................................. H8 Figure H6. Region R06.............................................................................................................................. H9 Figure H7. Region R07............................................................................................................................ H10 Figure H8. Region R08............................................................................................................................ H11 Figure H9. Region R09............................................................................................................................ H12 Figure H10. Region R10.......................................................................................................................... H13 Figure H11. Region R11.......................................................................................................................... H14 Figure H12. Region R12.......................................................................................................................... H15 Figure H13. Region R13.......................................................................................................................... H16 Figure H14. Region R14.......................................................................................................................... H17 Figure H15. Region R15.......................................................................................................................... H18 Figure H16. Region R16.......................................................................................................................... H19 Figure H17. Region R17.......................................................................................................................... H20 R.E. Ginna Nuclear Power Plant                                      v                                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                          Rev. 1
 
Figure H18. Region R18.......................................................................................................................... H21 Figure H19. Region R19.......................................................................................................................... H22 Figure H20. Region R20.......................................................................................................................... H23 Figure H21. Region R21.......................................................................................................................... H24 Figure H22. Region R22.......................................................................................................................... H25 Figure H23. Region R23.......................................................................................................................... H26 Figure H24. Region R24.......................................................................................................................... H27 Figure H25. Region 25 ............................................................................................................................ H28 Figure J1. ETE and Trip Generation: Summer, Midweek, Midday, Good Weather (Scenario 1) .............. J7 Figure J2. ETE and Trip Generation: Summer, Midweek, Midday, Rain (Scenario 2) ............................... J7 Figure J3. ETE and Trip Generation: Summer, Weekend, Midday, Good Weather (Scenario 3).............. J8 Figure J4. ETE and Trip Generation: Summer, Weekend, Midday, Rain (Scenario 4) .............................. J8 Figure J5. ETE and Trip Generation: Summer, Midweek, Weekend, Evening, Good Weather (Scenario 5) ................................................................................................................................................ J9 Figure J6. ETE and Trip Generation: Winter, Midweek, Midday, Good Weather (Scenario 6) ................ J9 Figure J7. ETE and Trip Generation: Winter, Midweek, Midday, Rain (Scenario 7) ............................... J10 Figure J8. ETE and Trip Generation: Winter, Midweek, Midday, Snow (Scenario 8) ............................. J10 Figure J9. ETE and Trip Generation: Winter, Weekend, Midday, Good Weather (Scenario 9) .............. J11 Figure J10. ETE and Trip Generation: Winter, Weekend, Midday, Rain (Scenario 10) ........................... J11 Figure J11. ETE and Trip Generation: Winter, Weekend, Midday, Snow (Scenario 11) ......................... J12 Figure J12. ETE and Trip Generation: Winter, Midweek, Weekend, Evening, Good Weather (Scenario 12) ............................................................................................................................................ J12 Figure J13. ETE and Trip Generation: Summer, Weekend, Midday, Good Weather, Special Event (Scenario 13) ............................................................................................................................................ J13 Figure J14. ETE and Trip Generation: Summer, Midweek, Midday, Good Weather, Roadway Impact (Scenario 14) ............................................................................................................................................ J13 Figure K1. Ginna Nuclear Power Plant LinkNode Analysis Network ....................................................... K2 Figure K2. LinkNode Analysis Network - Grid 1 ..................................................................................... K3 Figure K3. LinkNode Analysis Network - Grid 2 ..................................................................................... K4 Figure K4. LinkNode Analysis Network - Grid 3 ..................................................................................... K5 Figure K5. LinkNode Analysis Network - Grid 4 ..................................................................................... K6 Figure K6. LinkNode Analysis Network - Grid 5 ..................................................................................... K7 Figure K7. LinkNode Analysis Network - Grid 6 ..................................................................................... K8 Figure K8. LinkNode Analysis Network - Grid 7 ..................................................................................... K9 Figure K9. LinkNode Analysis Network - Grid 8 ................................................................................... K10 Figure K10. LinkNode Analysis Network - Grid 9 ................................................................................. K11 Figure K11. LinkNode Analysis Network - Grid 10 ............................................................................... K12 Figure K12. LinkNode Analysis Network - Grid 11 ............................................................................... K13 Figure K13. LinkNode Analysis Network - Grid 12 ............................................................................... K14 Figure K14. LinkNode Analysis Network - Grid 13 ............................................................................... K15 Figure K15. LinkNode Analysis Network - Grid 14 ............................................................................... K16 Figure K16. LinkNode Analysis Network - Grid 15 ............................................................................... K17 Figure K17. LinkNode Analysis Network - Grid 16 ............................................................................... K18 Figure K18. LinkNode Analysis Network - Grid 17 ............................................................................... K19 Figure K19. LinkNode Analysis Network - Grid 18 ............................................................................... K20 Figure K20. LinkNode Analysis Network - Grid 19 ............................................................................... K21 Figure K21. LinkNode Analysis Network - Grid 20 ............................................................................... K22 R.E. Ginna Nuclear Power Plant                                              vi                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                                  Rev. 1
 
Figure K22. LinkNode Analysis Network - Grid 21 ............................................................................... K23 Figure K23. LinkNode Analysis Network - Grid 22 ............................................................................... K24 Figure K24. LinkNode Analysis Network - Grid 23 ............................................................................... K25 Figure K25. LinkNode Analysis Network - Grid 24 ............................................................................... K26 Figure K26. LinkNode Analysis Network - Grid 25 ............................................................................... K27 Figure K27. LinkNode Analysis Network - Grid 26 ............................................................................... K28 Figure K28. LinkNode Analysis Network - Grid 27 ............................................................................... K29 Figure K29. LinkNode Analysis Network - Grid 28 ............................................................................... K30 Figure K30. LinkNode Analysis Network - Grid 29 ............................................................................... K31 Figure K31. LinkNode Analysis Network - Grid 30 ............................................................................... K32 Figure K32. LinkNode Analysis Network - Grid 31 ............................................................................... K33 Figure K33. LinkNode Analysis Network - Grid 32 ............................................................................... K34 Figure K34. LinkNode Analysis Network - Grid 33 ............................................................................... K35 Figure K35. LinkNode Analysis Network - Grid 34 ............................................................................... K36 Figure K36. LinkNode Analysis Network - Grid 35 ............................................................................... K37 Figure K37. LinkNode Analysis Network - Grid 36 ............................................................................... K38 Figure K38. LinkNode Analysis Network - Grid 37 ............................................................................... K39 Figure K39. LinkNode Analysis Network - Grid 38 ............................................................................... K40 Figure K40. LinkNode Analysis Network - Grid 39 ............................................................................... K41 Figure K41. LinkNode Analysis Network - Grid 40 ............................................................................... K42 Figure K42. LinkNode Analysis Network - Grid 41 ............................................................................... K43 Figure K43. LinkNode Analysis Network - Grid 42 ............................................................................... K44 Figure K44. LinkNode Analysis Network - Grid 43 ............................................................................... K45 Figure K45. LinkNode Analysis Network - Grid 44 ............................................................................... K46 R.E. Ginna Nuclear Power Plant                    vii                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                        Rev. 1
 
List of Tables Table 11. Stakeholder Interaction ........................................................................................................... 11 Table 12. Highway Characteristics ........................................................................................................... 15 Table 13. ETE Study Comparisons ............................................................................................................ 19 Table 21. Evacuation Scenario Definitions............................................................................................... 23 Table 22. Model Adjustment for Adverse Weather................................................................................. 27 Table 31. EPZ Permanent Resident Population ....................................................................................... 34 Table 32. Permanent Resident Population and Vehicles by ERPA........................................................... 34 Table 33. Shadow Population and Vehicles by Sector ............................................................................. 37 Table 34. Summary of Transients and Transient Vehicles ..................................................................... 310 Table 35. Summary of NonEPZ Resident Employees and Employee Vehicles...................................... 314 Table 36. R.E. Ginna Nuclear Power Plant EPZ External Traffic ............................................................. 318 Table 37. Summary of Population Demand ........................................................................................... 320 Table 38. Summary of Vehicle Demand ................................................................................................. 321 Table 51. Event Sequence for Evacuation Activities ................................................................................ 53 Table 52. Time Distribution for Notifying the Public ............................................................................... 56 Table 53. Time Distribution for Employees to Prepare to Leave Work ................................................... 57 Table 54. Time Distribution for Commuters to Travel Home .................................................................. 58 Table 55. Time Distribution for Population to Prepare to Evacuate ....................................................... 59 Table 56. Time Distribution for Population to Clear 6"8" of Snow ...................................................... 510 Table 57. Mapping Distributions to Events ............................................................................................ 512 Table 58. Description of the Distributions ............................................................................................. 513 Table 59. Trip Generation Histograms for the EPZ Population for Unstaged Evacuation ..................... 519 Table 510. Trip Generation Histograms for the EPZ Population for Staged Evacuation ....................... 521 Table 61. Description of Evacuation Regions........................................................................................... 63 Table 62. Evacuation Scenario Definitions............................................................................................... 65 Table 63. Percent of Population Groups Evacuating for Various Scenarios ............................................ 66 Table 64. Vehicle Estimates by Scenario.................................................................................................. 67 Table 71. Time to Clear the Indicated Area of 90 Percent of the Affected Population ........................... 79 Table 72. Time to Clear the Indicated Area of 100 Percent of the Affected Population ....................... 710 Table 73. Time to Clear 90 Percent of the 2Mile Area within the Indicated Region ............................ 711 Table 74. Time to Clear 100 Percent of the 2Mile Area within the Indicated Region .......................... 712 Table 75. Description of Evacuation Regions......................................................................................... 713 Table 81. TransitDependent Population Estimates ............................................................................... 814 Table 82. School and Evacuating Preschool Population Demand Estimates ......................................... 815 Table 83. School and Preschool Receiving Locations............................................................................. 816 Table 84. Special Facility Transit Demand ............................................................................................. 817 Table 85. Summary of Transportation Resources .................................................................................. 818 Table 86. Bus Route Descriptions .......................................................................................................... 819 Table 87. School Evacuation Time Estimates  Good Weather .............................................................. 821 Table 88. School Evacuation Time Estimates  Rain............................................................................... 823 Table 89. School Evacuation Time Estimates  Snow ............................................................................. 825 Table 810. Summary of TransitDependent Bus Routes ........................................................................ 827 Table 811. TransitDependent Evacuation Time Estimates  Good Weather ........................................ 828 Table 812. TransitDependent Evacuation Time Estimates  Rain ......................................................... 830 Table 813. Transit Dependent Evacuation Time Estimates  Snow ....................................................... 832 R.E. Ginna Nuclear Power Plant                              viii                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                  Rev. 1
 
Table 814. Special Facility Evacuation Time Estimates  Good Weather ............................................... 834 Table 815. Special Facility Evacuation Time Estimates  Rain ................................................................ 835 Table 816. Special Facility Evacuation Time Estimates  Snow .............................................................. 836 Table 817. Homebound Special Needs Population Evacuation Time Estimates .................................... 837 Table 121. Estimated Number of Telephone Calls Required for Confirmation of Evacuation .............. 122 Table A1. Glossary of Traffic Engineering Terms .................................................................................... A1 Table C1. Selected Measures of Effectiveness Output by DYNEV II ........................................................ C2 Table C2. Input Requirements for the DYNEV II Model ........................................................................... C3 Table C3. Glossary ....................................................................................................................................C8 Table E1. Schools and within the EPZ ...................................................................................................... E2 Table E2. Preschools within the EPZ ........................................................................................................ E3 Table E3. Medical Facilities within the EPZ .............................................................................................. E4 Table E4. Major Employers within the EPZ .............................................................................................. E5 Table E5. Recreational Attractions within the EPZ .................................................................................. E6 Table E6. Lodging Facilities within the EPZ .............................................................................................. E7 Table F1. R.E. Ginna Nuclear Power Plant Telephone Survey Sampling Plan .......................................... F2 Table H1. Percent of Zone Population Evacuating for Each Region ....................................................... H2 Table J1. Characteristics of the Ten Highest Volume Signalized Intersections........................................ J2 Table J2. Sample Simulation Model Input ............................................................................................... J3 Table J3. Selected Model Outputs for the Evacuation of the Entire EPZ (Region R03) ........................... J4 Table J4. Average Speed (mph) and Travel Time (min) for Major Evacuation Routes (Region R03, Scenario 1) ................................................................................................................................................. J4 Table J5. Simulation Model Outputs at Network Exit Links for Region R03, Scenario 1 ......................... J5 Table K1. Evacuation Roadway Network Characteristics ...................................................................... K47 Table K2. Nodes in the LinkNode Analysis Network which are Controlled ......................................... K110 Table M1. Evacuation Time Estimates for Trip Generation Sensitivity Study ....................................... M1 Table M2. Evacuation Time Estimates for Shadow Sensitivity Study .................................................... M2 Table M3. ETE Variation with Population Change ................................................................................. M4 Table N1. ETE Review Criteria Checklist ................................................................................................. N1 R.E. Ginna Nuclear Power Plant                                              ix                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                                  Rev. 1
 
EXECUTIVE
 
==SUMMARY==
 
This report describes the analyses undertaken and the results obtained by a study to develop Evacuation Time Estimates (ETE) for the R.E. Ginna Nuclear Power Plant (Ginna) located in Wayne, New York. ETE are part of the required planning basis and provide Constellation Energy Nuclear Group, LLC (CENG) and State and local governments with sitespecific information needed for Protective Action decisionmaking.
In the performance of this effort, guidance is provided by documents published by Federal Governmental agencies. Most important of these are:
Criteria for Development of Evacuation Time Estimate Studies, NUREG/CR7002, November 2011.
Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, NUREG0654/FEMAREP1, Rev. 1, November 1980.
Development of Evacuation Time Estimates for Nuclear Power Plants, NUREG/CR6863, January 2005.
10CFR50, Appendix E - Emergency Planning and Preparedness for Production and Utilization Facilities Overview of Project Activities This project began in February, 2012 and extended over a period of 9 months. The major activities performed are briefly described in chronological sequence:
Attended kickoff meetings with CENG personnel and emergency management personnel representing state and county governments.
Accessed U.S. Census Bureau data files for the year 2010. Studied Geographical Information Systems (GIS) maps of the area in the vicinity of the Ginna Plant, then conducted a detailed field survey of the highway network.
Synthesized this information to create an analysis network representing the highway system topology and capacities within the Emergency Planning Zone (EPZ), plus a Shadow Region covering the region between the EPZ boundary and approximately 15 miles radially from the plant.
Designed and sponsored a telephone survey of residents within the EPZ to gather focused data needed for this ETE study that were not contained within the census database. The survey instrument was reviewed and modified by the licensee and offsite response organization (ORO) personnel prior to the survey.
Data collection forms (provided to the OROs at the kickoff meeting) were returned with data pertaining to employment, transients, and special facilities in Wayne and Monroe R.E. Ginna Nuclear Power Plant                  ES1                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
counties. The traffic demand and tripgeneration rates of evacuating vehicles were estimated from the gathered data. The trip generation rates reflected the estimated mobilization time (i.e., the time required by evacuees to prepare for the evacuation trip) computed using the results of the telephone survey of EPZ residents.
Following federal guidelines, the EPZ is subdivided into 16 Emergency Response Planning Areas (ERPAs). These ERPAs are then grouped within circular areas or keyhole configurations (circles plus radial sectors) that define a total of 25 Evacuation Regions.
The timevarying external circumstances are represented as Evacuation Scenarios, each described in terms of the following factors: (1) Season (Summer, Winter); (2) Day of Week (Midweek, Weekend); (3) Time of Day (Midday, Evening); and (4) Weather (Good, Rain, Snow). One special event scenario - the Webster Fathers Day Soccer Tournament
        - was considered. One roadway impact scenario was considered where State Route 104 was closed just below the intersection with Plank Road.
Staged evacuation was considered for those regions wherein the 2 mile radius and sectors downwind to 5 miles were evacuated.
As per NUREG/CR7002, the Planning Basis for the calculation of ETE is:
A rapidly escalating accident at Ginna that quickly assumes the status of General Emergency such that the Advisory to Evacuate is virtually coincident with the siren alert, and no early protective actions have been implemented.
While an unlikely accident scenario, this planning basis will yield ETE, measured as the elapsed time from the Advisory to Evacuate until the stated percentage of the population exits the impacted Region, that represent upper bound estimates. This conservative Planning Basis is applicable for all initiating events.
If the emergency occurs while schools are in session, the ETE study assumes that the children will be evacuated by bus directly to reception centers or host schools located outside the EPZ. Parents, relatives, and neighbors are advised to not pick up their children at school prior to the arrival of the buses dispatched for that purpose. The ETE for schoolchildren are calculated separately.
Evacuees who do not have access to a private vehicle will either rideshare with relatives, friends or neighbors, or be evacuated by buses provided as specified in the county evacuation plans. Those in special facilities will likewise be evacuated with public transit, as needed: bus, van, or ambulance, as required. Separate ETE are calculated for the transitdependent evacuees, for homebound special needs population, and for those evacuated from special facilities.
Computation of ETE A total of 280 ETE were computed for the evacuation of the general public. Each ETE quantifies the aggregate evacuation time estimated for the population within one of the 25 Evacuation Regions to evacuate from that Region, under the circumstances defined for one of the 14 R.E. Ginna Nuclear Power Plant                    ES2                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
Evacuation Scenarios (25 x 14 = 350). Separate ETE are calculated for transitdependent evacuees, including schoolchildren for applicable scenarios.
Except for Region R03, which is the evacuation of the entire EPZ, only a portion of the people within the EPZ would be advised to evacuate. That is, the Advisory to Evacuate applies only to those people occupying the specified impacted region. It is assumed that 100 percent of the people within the impacted region will evacuate in response to this Advisory. The people occupying the remainder of the EPZ outside the impacted region may be advised to take shelter.
The computation of ETE assumes that 20% of the population within the EPZ but outside the impacted region, will elect to voluntarily evacuate. In addition, 20% of the population in the Shadow Region will also elect to evacuate. These voluntary evacuees could impede those who are evacuating from within the impacted region. The impedance that could be caused by voluntary evacuees is considered in the computation of ETE for the impacted region.
Staged evacuation is considered wherein those people within the 2mile region evacuate immediately, while those beyond 2 miles, but within the EPZ, shelterinplace. Once 90% of the 2mile region is evacuated, those people beyond 2 miles begin to evacuate. As per federal guidance, 20% of people beyond 2 miles will evacuate (noncompliance) even though they are advised to shelterinplace.
The computational procedure is outlined as follows:
A linknode representation of the highway network is coded. Each link represents a unidirectional length of highway; each node usually represents an intersection or merge point. The capacity of each link is estimated based on the field survey observations and on established traffic engineering procedures.
The evacuation trips are generated at locations called zonal centroids located within the EPZ and Shadow Region. The trip generation rates vary over time reflecting the mobilization process, and from one location (centroid) to another depending on population density and on whether a centroid is within, or outside, the impacted area.
The evacuation model computes the routing patterns for evacuating vehicles that are compliant with federal guidelines (outbound relative to the location of the plant), then simulate the traffic flow movements over space and time. This simulation process estimates the rate that traffic flow exits the impacted region.
The ETE statistics provide the elapsed times for 90 percent and 100 percent, respectively, of the population within the impacted region, to evacuate from within the impacted region. These statistics are presented in tabular and graphical formats. The 90th percentile ETE have been identified as the values that should be considered when making protective action decisions because the 100th percentile ETE are prolonged by those relatively few people who take longer to mobilize. This is referred to as the evacuation tail in Section 4.0 of NUREG/CR7002.
The use of a public outreach (information) program to emphasize the need for evacuees to minimize the time needed to prepare to evacuate (secure the home, assemble needed clothes, R.E. Ginna Nuclear Power Plant                    ES3                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
medicines, etc.) should also be considered.
Traffic Management This study references the comprehensive traffic management plans provided by Wayne and Monroe Counties, and identifies critical intersections.
Selected Results A compilation of selected information is presented on the following pages in the form of Figures and Tables extracted from the body of the report; these are described below.
Figure 61 displays a map of the Ginna EPZ showing the layout of the 16 ERPAs that comprise, in aggregate, the EPZ.
Table 31 presents the estimates of permanent resident population in each ERPA based on the 2010 Census data.
Table 61 defines each of the 25 Evacuation Regions in terms of their respective groups of ERPAs.
Table 62 lists the Evacuation Scenarios.
Tables 71 and 72 are compilations of ETE. These data are the times needed to clear the indicated regions of 90 and 100 percent of the population occupying these regions, respectively. These computed ETE include consideration of mobilization time and of estimated voluntary evacuations from other regions within the EPZ and from the Shadow Region.
Tables 73 and 74 present ETE for the 2mile region for unstaged and staged evacuations for the 90th and 100th percentiles, respectively.
Table 87 presents ETE for the schoolchildren in good weather.
Table 811 presents ETE for the transitdependent population in good weather.
Figure H8 presents an example of an Evacuation Region (Region R08) to be evacuated under the circumstances defined in Table 61. Maps of all regions are provided in Appendix H.
Conclusions General population ETE were computed for 350 unique cases - a combination of 25 unique Evacuation Regions and 14 unique Evacuation Scenarios. Table 71 and Table 72 document these ETE for the 90th and 100th percentiles. These ETE range from 1:35 (hr:min) to 2:45 at the 90th percentile.
Inspection of Table 71 and Table 72 indicates that the ETE for the 100th percentile are significantly longer than those for the 90th percentile because they are directly dependent on the mobilization times, creating an evacuation tail (See Figures 78 through 721). This fact implies that the congestion within the EPZ dissipates prior to the end of mobilization, as is displayed in Figure 77.
Inspection of Table 73 and Table 74 indicates that a staged evacuation provides no benefits to evacuees from within the 2 mile region and unnecessarily delays the evacuation of those beyond 2 miles (compare Regions R02 and R04 through R08 with R.E. Ginna Nuclear Power Plant                    ES4                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
Regions R20 through R25, respectively, in Tables 71 and 72). See Section 7.6 for additional discussion.
Comparison of Scenarios 3 (summer, midweek, midday) and 13 (summer, midweek, midday) in Table 72 indicates that the special event does not materially affect the ETE.
See Section 7.5 for additional discussion.
Comparison of Scenarios 1 and 14 in Table 71 indicates that the roadway closure -
State Route 404 just below the intersection with Plank Road - does not affect ETE. See Section 7.5 for additional discussion.
Webster is the most congested area during an evacuation. All congestion within the EPZ clears by 3 hours and 10 minutes after the Advisory to Evacuate. See Section 7.3 and Figures 73 through 77.
Separate ETE were computed for schools (and evacuating preschools), medical facilities, transitdependent persons and homebound special needs persons. The average single wave ETE for these facilities are within a similar range as the general population ETE at the 90th percentile. See Section 8.
Table 85 indicates that there are enough transportation resources to evacuate the population in a single wave. See Sections 8.4 and 8.5.
The general population ETE at the 90th percentile is insensitive to reductions in the base trip generation time of 3 hours and 45 minutes due to the traffic congestion within the EPZ. See Table M1.
The general population ETE is insensitive to the voluntary evacuation of vehicles in the Shadow Region (tripling the shadow evacuation percentage only increases 90th percentile ETE by 5 minutes). See Table M2.
A population increase of 51% or decrease of 87% result in ETE changes which meet the criteria for updating ETE between decennial Censuses. See Section M.3.
R.E. Ginna Nuclear Power Plant                  ES5                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure 61. Ginna EPZ ERPAs R.E. Ginna Nuclear Power Plant            ES6            KLD Engineering, P.C.
Evacuation Time Estimate                                                Rev. 1
 
Table 31. EPZ Permanent Resident Population ERPA              2000 Population        2010 Population M1                    3,938                  4,721 M2                    477                    666 M3                    355                    1,039 M4                    6,903                  8,088 M5                    1,311                  1,323 M6                    6,831                  7,088 M7                    7,556                  9,525 M8                    3,074                  3,151 M9                    3,896                  3,931 W1                    3,817                  4,197 W2                    5,951                  5,939 W3                    1,064                  1,168 W4                    2,191                  2,117 W5                    3,916                  4,232 W6                    2,147                  2,189 W7                    4,509                  4,575 TOTAL                  57,936                  63,949 EPZ Population Growth:                      10.4%
R.E. Ginna Nuclear Power Plant                      ES7                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
Table 61. Description of Evacuation Regions Basic Regions ERPA Region      Description      Degrees      W1  W2    W3  W4  W5  W6    W7    M1  M2    M3    M4  M5    M6  M7  M8 M9 R01        2Mile Region                    x R02        5Mile Region                    x    x      x                              x R03          Full EPZ                      x    x      x    x    x      x    x      x      x    x      x      x    x    x    x  x Evacuate 2Mile Region and Downwind to 5 Miles ERPA Region  Wind Direction From:  Degrees      W1  W2    W3  W4  W5  W6    W7    M1  M2    M3    M4  M5    M6  M7  M8 M9 R04              N            349  11    x    x R05        NNE, NE, ENE        12  78    x    x                                      x R06            E, ESE        79  124      x                                            x SE, SSE, S, SSW, SW  125  236                                              See Region R01 R07          WSW, W          237  281    x            x R08      WNW, NW, NNW        282  348    x    x      x Evacuate 5Mile Region and Downwind to the EPZ Boundary ERPA Region  Wind Direction From:  Degrees      W1  W2    W3  W4  W5  W6    W7    M1  M2    M3    M4  M5    M6  M7  M8 M9 R09              N            349  11    x    x      x          x      x    x      x      x                  x R10            NNE            12  33      x    x      x                        x      x      x    x      x      x          x R11              NE            34  56      x    x      x                        x      x      x    x      x      x    x    x    x  x R12            ENE            57  78      x    x      x                              x      x    x      x      x    x    x    x  x R13              E            79  101    x    x      x                              x            x      x            x    x    x  x R14              ESE          102  124    x    x      x                              x                                x          x SE, SSE, S, SSW, SW  125  236                                              See Region R02 R15            WSW            237  258    x    x      x    x                        x R16              W          259  281    x    x      x    x    x                  x R17            WNW            282  303    x    x      x    x    x      x            x R18            NW            304  326    x    x      x    x    x      x    x      x R19            NNW            327  348    x    x      x          x      x    x      x Staged Evacuation  2Mile Region Evacuates, then Evacuate Downwind to 5 Miles ERPA Region  Wind Direction From:  Degrees      W1  W2    W3  W4  W5  W6    W7    M1  M2    M3    M4  M5    M6  M7  M8 M9 R20          No Wind                      x    x      x                              x R21              N            349  11    x    x R22        NNE, NE, ENE        12  78    x    x                                      x R23            E, ESE        79  124      x                                            x SE, SSE, S, SSW, SW  125  236                                              See Region R01 R24          WSW, W          237  281    x            x R25      WNW, NW, NNW        282  348    x    x      x Key ERPA Evacuate              ERPA ShelterinPlace                    ShelterinPlace until 90% ETE for R01, then Evacuate R.E. Ginna Nuclear Power Plant                            ES8                                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Table 62. Evacuation Scenario Definitions Day of          Time of Scenario        Season1          Week              Day          Weather            Special 1            Summer          Midweek          Midday          Good              None 2            Summer          Midweek          Midday          Rain              None 3            Summer          Weekend          Midday          Good              None 4            Summer          Weekend          Midday          Rain              None Midweek, 5            Summer                            Evening          Good              None Weekend 6            Winter        Midweek          Midday          Good              None 7            Winter        Midweek          Midday          Rain              None 8            Winter        Midweek          Midday          Snow              None 9            Winter        Weekend          Midday          Good              None 10            Winter        Weekend          Midday          Rain              None 11            Winter        Weekend          Midday          Snow              None Midweek, 12            Winter                          Evening          Good              None Weekend Webster Fathers Day 13          Summer          Weekend          Midday          Good Soccer Tournament Roadway Impact - Lane 14          Summer          Midweek          Midday          Good Closure on SR 104 WB 1
Winter means that school is in session (also applies to spring and autumn). Summer means that school is not in session.
R.E. Ginna Nuclear Power Plant                          ES9                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                  Rev. 1
 
Table 71. Time to Clear the Indicated Area of 90 Percent of the Affected Population Summer              Summer        Summer                  Winter                          Winter        Winter  Summer      Summer Midweek                                                              Midweek Midweek            Weekend                                Midweek                        Weekend                Weekend    Midweek Weekend                                                                Weekend Scenario:      (1)        (2)    (3)        (4)      (5)          (6)        (7)      (8)        (9)      (10)  (11)  (12)      (13)      (14)
Midday              Midday        Evening                Midday                          Midday      Evening  Midday      Midday Region      Good                Good                Good          Good                            Good                  Good      Special  Roadway Rain                Rain                              Rain      Snow                Rain Snow Weather              Weather            Weather      Weather                          Weather                Weather    Event      Impact Entire 2Mile Region, 5Mile Region, and EPZ R01        1:50        1:50    1:35        1:35    1:35          1:50      1:50      2:15      1:35    1:35  2:05    1:35      1:35        1:50 R02        2:00        2:00    1:55        1:55    1:45          2:00      2:05      2:20      1:55    1:55  2:10  1:45      1:55        1:50 R03        2:15        2:20    1:55        2:00    1:50          2:15      2:25      2:45      1:55    2:00  2:15    1:50      1:55        2:20 2Mile Region and Keyhole to 5 Miles R04        2:00        2:05    1:55        2:00    1:50          2:05      2:05      2:15      1:55    2:00  2:10  1:50      1:55        2:00 R05        2:00        2:00    1:55        2:00    1:45          2:00      2:00      2:15      1:55    2:00  2:10    1:45      1:55        2:00 R06        1:50        1:50    1:35        1:35    1:35          1:50      1:50      2:15      1:35    1:35  2:05  1:35      1:35        1:50 R07        2:00        1:55    1:45        1:45    1:40          2:00      1:55      2:15      1:45    1:45  2:10    1:40      1:45        1:55 R08        2:00        2:05    1:55        2:00    1:50          2:05      2:05      2:15      1:55    2:05  2:10  1:50      1:55        2:00 5Mile Region and Keyhole to EPZ Boundary R09        2:00        2:00    1:50        1:55    1:45          2:00      2:00      2:20      1:55    1:55  2:15    1:45      1:50        2:00 R10        2:00        2:00    1:55        1:55    1:50          2:00      2:05      2:25      1:50    1:55  2:10  1:50      1:50        1:55 R11        2:15        2:25    1:55        2:00    1:50          2:15      2:25      2:40      1:55    2:00  2:15    1:50      1:55        2:15 R12        2:15        2:25    1:55        2:00    1:50          2:15      2:25      2:40      1:55    2:00  2:15  1:50      1:55        2:15 R13        2:10        2:25    1:55        2:00    1:50          2:15      2:25      2:40      1:50    2:00  2:15    1:50      1:55        2:15 R14        2:00        2:00    1:50        1:55    1:45          1:55      2:00      2:15      1:50    1:55  2:10  1:45      1:50        2:00 R15        2:00        2:00    1:55        1:55    1:45          2:00      2:00      2:15      1:55    2:00  2:10    1:45      1:55        2:00 R16        2:05        2:05    1:55        1:55    1:45          2:05      2:05      2:15      1:55    1:55  2:15  1:45      1:55        2:05 R17        2:05        2:05    1:55        1:55    1:45          2:00      2:05      2:20      1:55    1:55  2:10    1:45      1:55        2:00 R18        2:05        2:05    1:55        2:00    1:45          2:00      2:05      2:20      1:55    2:00  2:15  1:45      1:55        2:05 R19        2:00        2:05    1:55        1:55    1:45          2:00      2:05      2:20      1:55    1:55  2:15    1:45      1:55        2:00 Staged Evacuation  2Mile Region and Keyhole to 5 Miles R20        2:10        2:15    2:10        2:15    2:10          2:10      2:15      2:45      2:10    2:15  2:45  2:10      2:05        2:10 R21        2:10        2:10    2:05        2:10    2:05          2:10      2:10      2:30      2:05    2:10  2:30    2:05      2:05        2:10 R22        2:10        2:15    2:10        2:10    2:10          2:10      2:10      2:35      2:10    2:15  2:40  2:10      2:10        2:10 R23        2:05        2:10    2:05        2:05    2:05          2:05      2:10      2:40      2:05    2:10  2:40    2:05      2:05        2:05 R24        2:10        2:05    2:05        2:05    2:00          2:10      2:05      2:30      2:05    2:05  2:30  2:00      2:05        2:05 R25        2:10        2:10    2:10        2:10    2:05          2:10      2:10      2:35      2:10    2:10  2:35    2:05      2:10        2:10 R.E. Ginna Nuclear Power Plant                                              ES10                                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                        Rev. 1
 
Table 72. Time to Clear the Indicated Area of 100 Percent of the Affected Population Summer              Summer          Summer                    Winter                          Winter          Winter    Summer    Summer Midweek                                                                  Midweek Midweek              Weekend                                  Midweek                          Weekend                    Weekend    Midweek Weekend                                                                  Weekend Scenario:    (1)        (2)      (3)          (4)      (5)          (6)        (7)        (8)        (9)    (10)      (11)  (12)        (13)      (14)
Midday                Midday          Evening                Midday                          Midday          Evening    Midday    Midday Region      Good                Good                  Good        Good                              Good                    Good      Special  Roadway Rain                  Rain                              Rain      Snow                Rain    Snow Weather            Weather                Weather Weather                                  Weather                  Weather      Event    Impact Entire 2Mile Region, 5Mile Region, and EPZ R01        3:45      3:45      3:45        3:45      3:45        3:45      3:45        4:15        3:45    3:45    4:15    3:45      3:45      3:45 R02        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R03        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 2Mile Region and Keyhole to 5 Miles R04        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R05        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R06        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R07        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R08        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 5Mile Region and Keyhole to EPZ Boundary R09        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R10        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R11        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R12        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R13        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R14        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R15        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R16        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R17        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R18        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R19        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 Staged Evacuation  2Mile Region and Keyhole to 5 Miles R20        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R21        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R22        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R23        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R24        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R25        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R.E. Ginna Nuclear Power Plant                                                ES11                                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                          Rev. 1
 
Table 73. Time to Clear 90 Percent of the 2Mile Region Summer              Summer        Summer                  Winter                          Winter        Winter    Summer      Summer Midweek                                                              Midweek Midweek              Weekend                              Midweek                        Weekend                  Weekend    Midweek Weekend                                                              Weekend Scenario:      (1)      (2)        (3)      (4)      (5)        (6)        (7)      (8)        (9)      (10)  (11)  (12)        (13)        (14)
Midday              Midday        Evening                Midday                          Midday        Evening    Evening      Midday Region      Good                  Good              Good        Good                            Good                    Good        Special  Roadway Rain                Rain                              Rain    Snow                  Rain  Snow Weather            Weather              Weather Weather                            Weather                  Weather      Event      Impact Unstaged Evacuation  2Mile Region R01        1:50      1:50      1:35      1:35      1:35        1:50        1:50      2:15      1:35      1:35  2:05  1:35        1:35      1:50 Unstaged Evacuation  2Mile Region and Keyhole to 5Miles R02        1:50      1:50      1:35      1:35      1:35        1:50        1:50      2:15      1:35      1:40  2:05  1:35        1:35      1:50 R04        1:50      1:50      1:35      1:35      1:35        1:50        1:50      2:15      1:35      1:35  2:05  1:35        1:35      1:50 R05        1:50      1:50      1:35      1:35      1:35        1:50        1:50      2:15      1:35      1:35  2:05  1:35        1:35      1:50 R06        1:50      1:50      1:35      1:35      1:35        1:50        1:50      2:15      1:35      1:35  2:05  1:35        1:35      1:50 R07        1:50      1:50      1:35      1:35      1:35        1:50        1:50      2:15      1:35      1:35  2:05  1:35        1:35      1:50 R08        1:50      1:50      1:35      1:35      1:35        1:50        1:50      2:15      1:35      1:35  2:05  1:35        1:35      1:50 Staged Evacuation  2Mile Region and Keyhole to 5Miles R20        2:00      2:00      1:55      1:55      1:55        2:00        2:00      2:25      1:55      1:55  2:25  1:55        1:55      2:00 R21        1:55      1:55      1:40      1:40      1:40        1:55        1:55      2:20      1:40      1:40  2:10  1:40        1:40      1:55 R22        1:55      1:55      1:50      1:50      1:50        1:55        1:55      2:25      1:50      1:50  2:20  1:50        1:50      1:55 R23        1:55      1:55      1:50      1:50      1:50        1:55        1:55      2:25      1:50      1:50  2:20  1:50        1:50      1:55 R24        1:55      1:55      1:50      1:50      1:50        1:55        1:55      2:25      1:50      1:50  2:20  1:50        1:50      1:55 R25        1:55      1:55      1:50      1:50      1:50        1:55        1:55      2:25      1:50      1:50  2:20  1:50        1:50      1:55 R.E. Ginna Nuclear Power Plant                                            ES12                                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                    Rev. 1
 
Table 74. Time to Clear 100 Percent of the 2Mile Region Summer              Summer        Summer                  Winter                          Winter        Winter    Summer      Summer Midweek                                                              Midweek Midweek              Weekend                              Midweek                          Weekend                Weekend      Midweek Weekend                                                              Weekend Scenario:      (1)        (2)      (3)        (4)      (5)        (6)        (7)        (8)        (9)      (10)  (11)  (12)        (13)        (14)
Midday              Midday        Evening                Midday                          Midday      Evening    Evening      Midday Region      Good                  Good                Good      Good                              Good                    Good      Special    Roadway Rain                Rain                            Rain      Snow                  Rain  Snow Weather              Weather            Weather    Weather                          Weather                  Weather      Event      Impact Unstaged Evacuation  2Mile Region R01        3:45      3:45      3:45      3:45      3:45      3:45        3:45      4:15      3:45      3:45  4:15  3:45        3:45        3:45 Unstaged Evacuation  2Mile Region and Keyhole to 5Miles R02        3:45      3:45      3:45      3:45      3:45      3:45        3:50      4:15      3:45      3:45  4:15  3:45        3:45        3:45 R04        3:45      3:45      3:45      3:45      3:45      3:50        3:45      4:15      3:45      3:45  4:15  3:45        3:45        3:45 R05        3:45      3:45      3:45      3:45      3:45      3:45        3:45      4:15      3:45      3:45  4:15  3:45        3:45        3:45 R06        3:45      3:50      3:45      3:45      3:45      3:45        3:45      4:15      3:45      3:45  4:15  3:45        3:45        3:50 R07        3:45      3:45      3:45      3:45      3:45      3:45        3:45      4:15      3:45      3:45  4:15  3:45        3:45        3:45 R08        3:45      3:45      3:45      3:45      3:45      3:50        3:45      4:15      3:45      3:45  4:15  3:45        3:45        3:45 Staged Evacuation  2Mile Region and Keyhole to 5Miles R20        3:45      3:45      3:45      3:45      3:45      3:50        3:45      4:20      3:45      3:45  4:15  3:45        3:45        3:45 R21        3:45      3:45      3:45      3:45      3:45      3:45        3:45      4:20      3:45      3:45  4:15  3:45        3:45        3:50 R22        3:45      3:45      3:45      3:45      3:45      3:50        3:45      4:20      3:45      3:45  4:15  3:45        3:45        3:45 R23        3:45      3:45      3:45      3:45      3:45      3:45        3:45      4:15      3:45      3:45  4:15  3:45        3:45        3:45 R24        3:45      3:45      3:45      3:45      3:45      3:45        3:45      4:15      3:45      3:45  4:15  3:45        3:45        3:45 R25        3:45      3:45      3:45      3:45      3:45      3:45        3:45      4:20      3:45      3:45  4:15  3:45        3:45        3:50 R.E. Ginna Nuclear Power Plant                                          ES13                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                Rev. 1
 
Table 87. School Evacuation Time Estimates - Good Weather Travel                      Travel Dist.                  Time to          Dist. EPZ    Time Driver      Loading To EPZ        Average        EPZ            Bdry to  from EPZ      ETE to Mobilization    Time      Bdry        Speed        Bdry    ETE    R.C./R.L. Bdry to    R.C./R.L School            Time (min)      (min)      (mi)      (mph)        (min)  (hr:min)  (mi.)  H.S. (min)  (hr:min)
MONROE COUNTY SCHOOLS Dewitt Road Elementary School          90            15        School is outside the EPZ      1:45    13.6        21        2:10 Klem Road North Elementary School      90            15        3.4        9.6          22    2:10    13.5        21        2:30 Klem Road South Elementary School      90            15        3.5        9.6          23    2:10    13.4        21        2:30 Plank Road North Elementary School      90            15        School is outside the EPZ      1:45    12.5        19        2:05 Plank Road South Elementary School      90            15        School is outside the EPZ      1:45    12.3        19        2:05 Rochester Christian School              90            15        School is outside the EPZ      1:45    10.8        17        2:05 Schlegel Road Elementary School        90            15        7.1        12.2          35    2:20    13.4        21        2:45 Schroeder High School                  90            15        2.3        11.5          13    2:00    13.4        21        2:20 Spry Middle School                      90            15        4.3        10.0          26    2:15    13.4        21        2:35 St Rita's School                        90            15        School is outside the EPZ      1:45    13.9        21        2:10 State Road Elementary School            90            15        5.7        10.9          32    2:20    13.4        21        2:40 Thomas High School                      90            15        1.9        11.5          11    2:00    13.4        21        2:20 Webster Christian School                90            15        4.0        10.0          25    2:10    13.5        21        2:35 Webster Montessori School              90            15        0.2        11.7          2    1:50    13.1        20        2:10 Willink Middle School                  90            15        2.2        11.5          12    2:00    13.4        21        2:20 WAYNE COUNTY SCHOOLS Freewill Elementary School              47            15        3.7        37.7          6    1:10      8.4        13        1:25 Hop Skip & Jump Preschool              90            15        7.9        30.8          16    2:05      8.5        13        2:15 James A. Beneway High School            29            15        6.0        33.3          11    0:55      8.4        13        1:10 Lake Ontario Child Development          90            15        4.7        42.4          7    1:55    17.5        27        2:20 Magic Years Nursery School              90            15        6.7        44.7          10    1:55      7.7        12        2:10 Marion Central Middle/High School      90            15        2.4        44.4          4    1:50    14.0        21        2:10 Marion Elementary School                90            15        School is outside the EPZ      1:45    13.9        21        2:10 Ontario Elementary School              23            15        6.8        35.1          12    0:50      8.4        13        1:05 Ontario Primary School                  18            15        7.1        36.7          12    0:45      8.4        13        1:00 Raggedy Ann & Andy Day Care            90            15        4.2        42.4          6    1:55    17.2        26        2:20 R.E. Ginna Nuclear Power Plant                                    ES14                                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                  Rev. 1
 
Travel                        Travel Dist.            Time to          Dist. EPZ    Time Driver    Loading To EPZ Average      EPZ            Bdry to    from EPZ      ETE to Mobilization  Time    Bdry  Speed      Bdry    ETE    R.C./R.L. Bdry to    R.C./R.L School          Time (min)    (min)  (mi)  (mph)      (min)  (hr:min)  (mi.)  H.S. (min)    (hr:min)
Rhyme Tyme Child Care Center          90        15      7.7    30.8        15      2:00      8.4        13        2:15 The Tot Spot Day Care Center          90        15      7.4    30.6        15      2:00      8.4        13        2:15 Thomas C. Armstrong Middle School    39        15      6.0    25.3        15      1:10      8.4        13        1:25 Wayne Education Center                90        15      3.4    46.0        5      1:50    17.5        27        2:20 Wayne Finger Lake BOCES              90        15      3.4    46.0        5      1:50    17.5        27        2:20 Wayne Technical & Career Center      90        15      3.4    46.0        5      1:50    17.5        27        2:20 Williamson Elementary School          23        15      6.3    45.8        9      0:50    14.1        22        1:10 Williamson Middle School              23        15      6.3    45.8        9      0:50    14.1        22        1:10 Williamson Senior High School        23        15      5.1    45.8        7      0:45    14.1        22        1:10 Maximum for EPZ:    2:20            Maximum:        2:45 Average for EPZ:  1:45              Average:      2:05 R.E. Ginna Nuclear Power Plant                              ES15                                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                      Rev. 1
 
Table 811. TransitDependent Evacuation Time Estimates - Good Weather OneWave                                                        TwoWave Route                                Travel                  Route Route            Travel Pickup            Distance  Time to          Driver  Travel    Pickup Route        Bus    Mobilization Length    Speed    Time  Time    ETE      to R. C. R. C. Unload  Rest    Time      Time      ETE Number      Number      (min)    (miles)  (mph)    (min)  (min)  (hr:min)    (miles)    (min)    (min) (min)    (min)    (min)  (hr:min)
M1 Route A      1          90        16.3    19.2      51    30      2:55      10.7        16      5    10      45        30      4:45 M1 Route A      2          110      16.3    27.1      36    30      3:00      10.7        16      5    10      45        30      4:50 M1 Route B      1          90        16.7    19.2      52    30      2:55      10.7        16      5    10      45        30      4:45 M1 Route B    2&3          110      16.7    25.1      40    30      3:00      10.7        16      5    10      45        30      4:50 M2 Route C      1          90        15.6    17.4      54    30      2:55      10.7        16      5    10      44        30      4:45 M3 Route D      1          90        14.0    15.1      56    30      3:00      10.7        16      5    10      42        30      4:45 M4 Route E      1          90        12.5    13.3      57    30      3:00        9.4        14      5    10      42        30      4:45 M4 Route E    2&3          110      12.5    18.6      40    30      3:05        9.4        14      5    10      42        30      4:50 M4 Route F      1          90        14.5    20.6      42    30      2:45        9.4        14      5    10      46        30      4:30 M4 Route F    2&3          110      14.5    21.4      41    30      3:05        9.4        14      5    10      45        30      4:50 M4 Route G      1          90        12.1    18.9      38    30      2:40        9.4        14      5    10      42        30      4:25 M4 Route G    2&3          110      12.1    17.8      41    30      3:05        9.4        14      5    10      41        30      4:45 M5 Route H      1          90      12.6    40.7      19    30      2:20        9.4        14      5    10      40        30      4:00 M5 Route H      2          90      12.6    40.7      19    30      2:20        9.4        14      5    10      40        30      4:00 M5 Route I      1          90        18.5    42.4      26    30      2:30        9.4        14      5    10      48        30      4:20 M5 Route I      2          90        18.5    42.4      26    30      2:30      10.7        16      5    10      50        30      4:25 M6 Route J      1          90      10.1    13.8      44    30      2:45      10.7        16      5    10      38        30      4:25 M6 Route J      2          90      10.1    13.8      44    30      2:45      10.7        16      5    10      38        30      4:25 M6 Route K      1          90        13.4    44.4      18    30      2:20      10.7        16      5    10      42        30      4:05 M6 Route K      2          90        13.4    44.4      18    30      2:20      10.7        16      5    10      42        30      4:05 M6 Route L      1          90        9.6    16.2      36    30      2:40      10.7        16      5    10      37        30      4:20 M6 Route L      2          90        9.6    16.2      36    30      2:40      10.7        16      5    10      37        30      4:20 M7 Route M      1          90        7.1    13.9      31    30      2:35      15.3        23      5    10      42        30      4:30 M7 Route M    2&3          100        7.1    14.6      29    30      2:40      15.3        23      5    10      42        30      4:30 M7 Route M    4&5          110        7.1    17.4      24    30      2:45      15.3        23      5    10      42        30      4:35 M7 Route N      1          90        9.9    20.0      30    30      2:30      15.3        23      5    10      45        30      4:25 M7 Route N    2&3          100        9.9    21.4      28    30      2:40      15.3        23      5    10      47        30      4:35 M7 Route N    4&5          110        9.9    23.7      25    30      2:50      15.3        23      5    10      47        30      4:45 M8 Route P      1          90        4.0      8.8      27    30      2:30      10.7        16      5    10      33        30      4:05 M8 Route Q      1          90        4.4    42.8      6    30      2:10      10.7        16      5    10      33        30      3:45 R.E. Ginna Nuclear Power Plant                                        ES16                                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                  Rev. 1
 
OneWave                                                    TwoWave Route                              Travel                Route Route          Travel Pickup            Distance Time to        Driver  Travel    Pickup Route        Bus    Mobilization Length  Speed    Time    Time    ETE    to R. C. R. C. Unload  Rest    Time      Time      ETE Number      Number      (min)    (miles) (mph)  (min)    (min)  (hr:min)  (miles)  (min)  (min) (min)    (min)    (min)  (hr:min)
M8 Route Q      2          110      4.4    41.6      6      30      2:30    10.7      16      5    10      34        30      4:10 M9 Route R    1&2          90        7.1    8.8    48      30      2:50    10.7      16      5    10      37        30      4:30 M9 Route R    3&4          110      7.1    17.4    24      30      2:45    10.7      16      5    10      35        30      4:25 W1 Route 1      1          90      18.7  39.6    28      30      2:30      8.2      12      5    10      48        30      4:15 W1 Route 1      2          90      18.7  39.6    28      30      2:30      8.2      12      5    10      44        30      4:15 W1 Route 2      1          90      16.2  36.1    27      30      2:30      8.4      13      5    10      46        30      4:15 W1 Route 2      2          110      16.2  38.5    25      30      2:50      8.4      13      5    10      41        30      4:30 W1 Route 3      1          90      14.9  35.8    25      30      2:25      7.7      12      5    10      40        30      4:05 W1 Route 3      2          110      14.9  36.7    24      30      2:45      7.7      12      5    10      41        30      4:25 W2 Route 1      1          90      11.3  45.4    15      30      2:15      8.4      13      5    10      37        30      3:50 W2 Route 1      2          110      11.3  46.0    15      30      2:35      8.4      13      5    10      39        30      4:15 W2 Route 2      1          90      16.1  33.9    28      30      2:30      8.4      13      5    10      45        30      4:15 W2 Route 2      2          110      16.1  36.8    26      30      2:50      8.4      13      5    10      45        30      4:35 W2 Route 3      1          90      16.4  47.0    21      30      2:25      7.7      12      5    10      41        30      4:05 W2 Route 3      2          110      16.4  47.3    21      30      2:45      7.7      12      5    10      42        30      4:25 W3 Route 1      1          90      15.9  40.9    23      30      2:25    17.5      26      5    10      58        30      4:35 W3 Route 2      1          90        7.8  49.4      9      30      2:10    20.6      31      5    10      50        30      4:20 W4 Route 1      1          90        6.5  26.4    15      30      2:15    17.2      26      5    10      44        30      4:10 W4 Route 2      1          90      10.1  22.0    28      30      2:30    17.2      26      5    10      48        30      4:30 W5 Route 1      1          90        8.9  36.7    15      30      2:15    17.2      26      5    10      46        30      4:15 W5 Route 2      1          90        6.4  46.8      8      30      2:10    14.5      22      5    10      40        30      4:00 W5 Route 3      1          90        7.0  50.4      8      30      2:10    14.5      22      5    10      40        30      4:00 W6 Route 1      1          90        7.8  49.4    10      30      2:10    14.5      22      5    10      41        30      4:00 W6 Route 2      1          90        6.5  46.0      8      30      2:10    14.1      21      5    10      39        30      4:00 W6 Route 3      1          90      10.0  45.0    13      30      2:15    14.1      21      5    10      43        30      4:05 W6 Route 4      1          90        7.7  43.8    11      30      2:15    14.2      21      5    10      41        30      4:05 W7 Route 1      1          90      13.3  32.5    25      30      2:25      8.4      13      5    10      38        30      4:05 W7 Route 2      1          90      10.8  43.2    15      30      2:15      8.4      13      5    10      35        30      3:50 W7 Route 3      1          90        9.9  45.7    13      30      2:15      8.4      13      5    10      34        30      3:50 Maximum ETE:    3:05                                      Maximum ETE:      4:50 Average ETE:  2:35                                        Average ETE:    4:20 R.E. Ginna Nuclear Power Plant                                        ES17                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                            Rev. 1
 
Figure H8. Region R08 R.E. Ginna Nuclear Power Plant          ES18        KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
1    INTRODUCTION This report describes the analyses undertaken and the results obtained by a study to develop Evacuation Time Estimates (ETE) for the R.E. Ginna Nuclear Power Plant (Ginna), located in Ontario, Wayne County, New York. ETE provide State and local governments with sitespecific information needed for Protective Action decisionmaking.
In the performance of this effort, guidance is provided by documents published by Federal Governmental agencies. Most important of these are:
* Criteria for Development of Evacuation Time Estimate Studies, NUREG/CR7002, November 2011.
* Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, NUREG 0654/FEMA REP 1, Rev. 1, November 1980.
* Analysis of Techniques for Estimating Evacuation Times for Emergency Planning Zones, NUREG/CR 1745, November 1980.
* Development of Evacuation Time Estimates for Nuclear Power Plants, NUREG/CR 6863, January 2005.
The work effort reported herein was supported and guided by local stakeholders who contributed suggestions, critiques, and the local knowledge base required. Table 11 presents a summary of stakeholders and interactions.
Table 11. Stakeholder Interaction Stakeholder                              Nature of Stakeholder Interaction Meetings to define data requirements and set up CENG contacts with local government agencies Monroe and Wayne County Emergency Obtain emergency plans and special facility data Management Departments New York State Office of Emergency Management        Obtain emergency and traffic management plans Local and State Police Agencies                      Obtain emergency and traffic management plans 1.1    Overview of the ETE Process The following outline presents a brief description of the work effort in chronological sequence:
: 1. Information Gathering:
: a. Defined the scope of work in discussions with representatives from CENG.
: b. Attended meetings with emergency planners from Monroe County EMD and Wayne County EMD to identify issues to be addressed and resources available.
R.E. Ginna Nuclear Power Plant                    11                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                            Rev. 1
: c. Conducted a detailed field survey of the highway system and of area traffic conditions within the Emergency Planning Zone (EPZ) and Shadow Region.
: d. Obtained demographic data from the 2010 census, Monroe County EMD and Wayne County EMD.
: e. Conducted a random sample telephone survey of EPZ residents.
: f. Conducted a data collection effort to identify and describe schools, special facilities, major employers, transportation providers, and other important information.
: 2. Estimated distributions of Trip Generation times representing the time required by various population groups (permanent residents, employees, and transients) to prepare (mobilize) for the evacuation trip. These estimates are primarily based upon the random sample telephone survey.
: 3. Defined Evacuation Scenarios. These scenarios reflect the variation in demand, in trip generation distribution and in highway capacities, associated with different seasons, day of week, time of day and weather conditions.
: 4. Reviewed the existing traffic management plan to be implemented by local and state police in the event of an incident at the plant. Traffic control is applied at specified Traffic Control Points (TCP) located within the EPZ.
: 5. Used existing Emergency Response Planning Areas (ERPAs) to define Evacuation Regions. The EPZ is partitioned into 16 ERPAs along jurisdictional and geographic boundaries. Regions are groups of contiguous ERPAs for which ETE are calculated.
The configurations of these Regions reflect wind direction and the radial extent of the impacted area. Each Region, other than those that approximate circular areas, approximates a keyhole section within the EPZ as recommended by NUREG/CR7002.
: 6. Estimated demand for transit services for persons at Special Facilities and for transit dependent persons at home.
: 7. Prepared the input streams for the DYNEV II system.
: a. Estimated the evacuation traffic demand, based on the available information derived from Census data, and from data provided by local and state agencies, CENG and from the telephone survey.
: b. Applied the procedures specified in the 2010 Highway Capacity Manual (HCM1) to the data acquired during the field survey, to estimate the capacity of all highway segments comprising the evacuation routes.
: c. Developed the linknode representation of the evacuation network, which is used as the basis for the computer analysis that calculates the ETE.
1 Highway Capacity Manual (HCM 2010), Transportation Research Board, National Research Council, 2010.
R.E. Ginna Nuclear Power Plant                      12                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
: d. Calculated the evacuating traffic demand for each Region and for each Scenario.
: e. Specified selected candidate destinations for each origin (location of each source where evacuation trips are generated over the mobilization time) to support evacuation travel consistent with outbound movement relative to the location of the Ginna Plant.
: 8. Executed the DYNEV II model to determine optimal evacuation routing and compute ETE for all residents, transients and employees (general population) with access to private vehicles. Generated a complete set of ETE for all specified Regions and Scenarios.
: 9. Documented ETE in formats in accordance with NUREG/CR7002.
: 10. Calculated the ETE for all transit activities including those for special facilities (schools, medical facilities, etc.), for the transitdependent population and for homebound special needs population.
1.2    The R.E. Ginna Nuclear Power Plant Ginna is located along the shores of Lake Ontario in Ontario, Wayne County, New York.
The site is approximately 25 miles northeast of Rochester, NY. The Emergency Planning Zone (EPZ) consists of parts of Wayne and Monroe Counties in New York. Figure 11 displays the area surrounding Ginna. This map identifies the communities in the area and the major roads.
R.E. Ginna Nuclear Power Plant                      13                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
Figure 11. R.E. Ginna Nuclear Power Plant Location R.E. Ginna Nuclear Power Plant                        14                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
1.3    Preliminary Activities These activities are described below.
Field Surveys of the Highway Network KLD personnel drove the entire highway system within the EPZ and the Shadow Region which consists of the area between the EPZ boundary and approximately 15 miles radially from the plant. The characteristics of each section of highway were recorded. These characteristics are shown in Table 12:
Table 12. Highway Characteristics Number of lanes                                Posted speed Lane width                                    Actual free speed Shoulder type & width                          Abutting land use Interchange geometries                        Control devices Lane channelization & queuing                  Intersection configuration (including capacity (including turn bays/lanes)            roundabouts where applicable)
Geometrics: curves, grades (>4%)              Traffic signal type Unusual characteristics: Narrow bridges, sharp curves, poor pavement, flood warning signs, inadequate delineations, toll booths, etc.
Video and audio recording equipment were used to capture a permanent record of the highway infrastructure. No attempt was made to meticulously measure such attributes as lane width and shoulder width; estimates of these measures based on visual observation and recorded images were considered appropriate for the purpose of estimating the capacity of highway sections. For example, Exhibit 157 in the HCM indicates that a reduction in lane width from 12 feet (the base value) to 10 feet can reduce free flow speed (FFS) by 1.1 mph - not a material difference - for twolane highways. Exhibit 1530 in the HCM shows little sensitivity for the estimates of Service Volumes at Level of Service (LOS) E (near capacity), with respect to FFS, for twolane highways.
The data from the audio and video recordings were used to create detailed geographical information systems (GIS) shapefiles and databases of the roadway characteristics and of the traffic control devices observed during the road survey; this information was referenced while preparing the input stream for the DYNEV II System.
As documented on page 155 of the HCM 2010, the capacity of a twolane highway is 1700 passenger cars per hour in one direction. For freeway sections, a value of 2250 vehicles per hour per lane is assigned, as per Exhibit 1117 of the HCM 2010. The road survey has identified several segments which are characterized by adverse geometrics on twolane highways which are reflected in reduced values for both capacity and speed. These estimates are consistent with the service volumes for LOS E presented in HCM Exhibit 1530. These links may be R.E. Ginna Nuclear Power Plant                      15                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
identified by reviewing Appendix K. Link capacity is an input to DYNEV II which computes the ETE. Further discussion of roadway capacity is provided in Section 4 of this report.
Traffic signals are either pretimed (signal timings are fixed over time and do not change with the traffic volume on competing approaches), or are actuated (signal timings vary over time based on the changing traffic volumes on competing approaches). Actuated signals require detectors to provide the traffic data used by the signal controller to adjust the signal timings.
These detectors are typically magnetic loops in the roadway, or video cameras mounted on the signal masts and pointed toward the intersection approaches. If detectors were observed on the approaches to a signalized intersection during the road survey, detailed signal timings were not collected as the timings vary with traffic volume. TCPs at locations which have control devices are represented as actuated signals in the DYNEV II system.
If no detectors were observed, the signal control at the intersection was considered pretimed, and detailed signal timings were gathered for several signal cycles. These signal timings were input to the DYNEV II system used to compute ETE, as per NUREG/CR7002 guidance.
Figure 12 presents the linknode analysis network that was constructed to model the evacuation roadway network in the EPZ and Shadow Region. The directional arrows on the links and the node numbers have been removed from Figure 12 to clarify the figure. The detailed figures provided in Appendix K depict the analysis network with directional arrows shown and node numbers provided. The observations made during the field survey were used to calibrate the analysis network.
Telephone Survey A telephone survey was undertaken to gather information needed for the evacuation study.
Appendix F presents the survey instrument, the procedures used and tabulations of data compiled from the survey returns.
These data were utilized to develop estimates of vehicle occupancy to estimate the number of evacuating vehicles during an evacuation and to estimate elements of the mobilization process.
This database was also referenced to estimate the number of transitdependent residents.
Computing the Evacuation Time Estimates The overall study procedure is outlined in Appendix D. Demographic data were obtained from several sources, as detailed later in this report. These data were analyzed and converted into vehicle demand data. The vehicle demand was loaded onto appropriate source links of the analysis network using GIS mapping software. The DYNEV II system was then used to compute ETE for all Regions and Scenarios.
Analytical Tools The DYNEV II System that was employed for this study is comprised of several integrated computer models. One of these is the DYNEV (DYnamic Network EVacuation) macroscopic simulation model, a new version of the IDYNEV model that was developed by KLD under contract with the Federal Emergency Management Agency (FEMA).
R.E. Ginna Nuclear Power Plant                  16                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure 12. Ginna LinkNode Analysis Network R.E. Ginna Nuclear Power Plant                      17                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                  Rev. 1
 
DYNEV II consists of four submodels:
A macroscopic traffic simulation model (for details, see Appendix C).
A Trip Distribution (TD), model that assigns a set of candidate destination (D) nodes for each origin (O) located within the analysis network, where evacuation trips are generated over time. This establishes a set of OD tables.
A Dynamic Traffic Assignment (DTA), model which assigns trips to paths of travel (routes) which satisfy the OD tables, over time. The TD and DTA models are integrated to form the DTRAD (Dynamic Traffic Assignment and Distribution) model, as described in Appendix B.
A Myopic Traffic Diversion model which diverts traffic to avoid intense, local congestion, if possible.
Another software product developed by KLD, named UNITES (UNIfied Transportation Engineering System) was used to expedite data entry and to automate the production of output tables.
The dynamics of traffic flow over the network are graphically animated using the software product, EVAN (EVacuation ANimator), developed by KLD. EVAN is GIS based, and displays statistics such as LOS, vehicles discharged, average speed, and percent of vehicles evacuated, output by the DYNEV II System. The use of a GIS framework enables the user to zoom in on areas of congestion and query road name, town name and other geographical information.
The procedure for applying the DYNEV II System within the framework of developing ETE is outlined in Appendix D. Appendix A is a glossary of terms.
For the reader interested in an evaluation of the original model, IDYNEV, the following references are suggested:
NUREG/CR4873 - Benchmark Study of the IDYNEV Evacuation Time Estimate Computer Code NUREG/CR4874 - The Sensitivity of Evacuation Time Estimates to Changes in Input Parameters for the IDYNEV Computer Code The evacuation analysis procedures are based upon the need to:
Route traffic along paths of travel that will expedite their travel from their respective points of origin to points outside the EPZ.
Restrict movement toward the plant to the extent practicable, and disperse traffic demand so as to avoid focusing demand on a limited number of highways.
Move traffic in directions that are generally outbound, relative to the Ginna location.
DYNEV II provides a detailed description of traffic operations on the evacuation network.
This description enables the analyst to identify bottlenecks and to develop countermeasures that are designed to represent the behavioral responses of evacuees. The effects of these countermeasures may then be tested with the model.
R.E. Ginna Nuclear Power Plant                    18                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
1.4    Comparison with Prior ETE Study Table 13 presents a comparison of the present ETE study with the 2004 study. The major factors contributing to the differences between the ETE values obtained in this study and those of the previous study can be summarized as follows:
Voluntary and shadow evacuations are considered at a different percentage.
The highway representation is far more detailed, providing evacuating vehicles with more route choices.
Traffic control points and actuated signals are incorporated into the simulation model.
Table 13. ETE Study Comparisons Topic                      Previous ETE Study                        Current ETE Study ArcGIS Software using 2010 US Resident Population    2000 Census, extrapolated to 2003.          Census blocks; area ratio method Basis                  Population = 58,614                          used.
Population = 63,949 Based on residential telephone survey        Based on 2012 telephone survey:
Resident Population adapted from Nine Mile Point, 1.25          1.33 evacuating vehicles per Vehicle Occupancy evacuating vehicles per household            household, 1.92 persons per vehicle.
Employment journey to work data identified the proportion of employees Employee estimates based on who commute into the EPZ relative to the information provided about major total number of employees. These Employee                                                            employers in EPZ. 1.08 employees proportions were applied on an ERPA by Population                                                          per vehicle based on telephone ERPA basis to total employment survey results.
information for the year 2000 from NYS Dept. of Labor.                              Employees = 8,417 Employees = 13,076 Estimates based upon U.S. Census data and the results of the telephone survey. A total of 2,046 Defined as households with 0 vehicles +
people who do not have access to a households with 1 and 2 vehicles with vehicle, requiring 69 buses to commuters who do not return home.
TransitDependent                                                    evacuate. An additional 222 Household size varies by county and Population                                                          homebound special needs persons number of vehicles in household. Total of needed special transportation to 3,067 people without access to a vehicle, evacuate (113 required a bus, 47 requiring 104 bus runs.
required a wheelchairaccessible vehicle, and 62 required an ambulance).
R.E. Ginna Nuclear Power Plant                      19                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
Topic                      Previous ETE Study                      Current ETE Study Transient estimates based upon Based on telephone calls to individual Transient                                                          information provided about facilities Population                                                        transient attractions in EPZ.
Transients = 2,103 Transients = 2,102 Special facility population based on Special facility population based on      information provided by each information provided by each county        county within the EPZ.
Special Facilities      within the EPZ.
Current census = 492 Population              Special Facility Population = 68 Vans Required = 32 Vehicles originating at special facilities Wheelchair Bus Required = 16
                        =18 Ambulances Required = 2 School population based on School population based on information information provided by each provided by each county within the EPZ.
School Population                                                  county within the EPZ.
School enrollment = 15,430 School enrollment = 15,033 Vehicles originating at schools = 364 Buses required = 284 Voluntary evacuation from        50 percent within circle. 35 percent in    20 percent of the population within within EPZ in areas    annular ring between the circle and EPZ    the EPZ, but not within the outside region to be    boundary.                                  Evacuation Region (see Figure 21) evacuated Population in areas west and southwest of the EPZ boundary in Monroe County within the bounding state highways in      20% of people outside of the EPZ Shadow Evacuation      the west and state highway 31 in the      within the Shadow Region south was considered. Nominally, 30        (see Figure 72) percent of this population will move away from the EPZ.
Network Size            1,148 Links; 444 Nodes                    1,539 links; 1,049 nodes Field surveys conducted in 2002            Field surveys conducted in February Roadway Geometric                                                  2012. Roads and intersections were Data                                                              video archived.
Road capacities based on 2000 HCM Road capacities based on 2010 HCM.
Direct evacuation to designated School Evacuation      Direct evacuation                          Reception Center/Receiving Location.
50 percent of transitdependent 50 percent of transitdependent persons Ridesharing                                                        persons will evacuate with a will evacuate with a neighbor or friend.
neighbor or friend.
R.E. Ginna Nuclear Power Plant                      110                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                            Rev. 1
 
Topic                      Previous ETE Study                      Current ETE Study Based on residential telephone survey Based on residential telephone of specific pretrip mobilization        survey of specific pretrip activities:                              mobilization activities:
Residents with commuters returning        Residents with commuters leave between 30 and 150 minutes          returning leave between 30 and Residents without commuters              225 minutes.
returning leave between 15 and 120        Residents without commuters minutes                                  returning leave between 15 and Employees and transients leave            165 minutes.
Trip Generation for    between 15 and 90 minutes.                Employees and transients leave Evacuation                                                        between 15 and 105 minutes.
All times measured from the Advisory to Evacuate for all above.                All times measured from the Additional time to clear snow added      Advisory to Evacuate.
to residential evacuation times for      Additional time to clear snow snow scenarios.                          added to residential mobilization Xerox facility in Webster is notified    times for snow scenarios.
before the Advisory to Evacuate is issued ATE virtually coincident with the the general public. Xerox begins          siren alert for all population mobilizing 30 minutes before general groups, as per NUREG/CR7002 public.
Good, Rain, or Snow. The capacity and free flow speed of all links in the Weather                Clear or Rain or Snow network are reduced by 10% in the event of rain and 20% for snow.
Modeling                IDYNEV System: TRAD and PCDYNEV          DYNEV II System - Version 4.0.8.0 Webster Fathers Day Soccer Tournament Special Events          None considered Special Event Population = 2,500 additional transients 25 Regions (central sector wind 35 Regions and 12 Scenarios producing    direction and each adjacent sector Evacuation Cases 420 unique cases.                        technique used) and 14 Scenarios producing 350 unique cases.
Reported for 50, 90, 95, and 100          ETE reported for 90th and 100th Evacuation Time percentile population. Results presented  percentile population. Results Estimates Reporting by Region                                presented by Region and Scenario.
R.E. Ginna Nuclear Power Plant                      111                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                            Rev. 1
 
Topic                  Previous ETE Study          Current ETE Study Winter Weekday Midday,      Winter Weekday Midday, Evacuation Time        Good Weather: 4:55          Good Weather: 2:15 Estimates for the entire EPZ, 90th percentile              Summer Weekend, Midday,      Summer Weekend, Midday, Good Weather: 3:05          Good Weather: 1:55 R.E. Ginna Nuclear Power Plant                  112                KLD Engineering, P.C.
Evacuation Time Estimate                                                          Rev. 1
 
2    STUDY ESTIMATES AND ASSUMPTIONS This section presents the estimates and assumptions utilized in the development of the evacuation time estimates.
2.1    Data Estimates
: 1. Population estimates are based upon Census 2010 data.
: 2. Estimates of employees who reside outside the EPZ and commute to work within the EPZ are based upon data provided by the county emergency management departments.
: 3. Population estimates at special facilities are based on provided by the county emergency management departments.
: 4. Roadway capacity estimates are based on field surveys and the application of the Highway Capacity Manual 2010.
: 5. Population mobilization times are based on a statistical analysis of data acquired from a random sample telephone survey of EPZ residents (see Section 5 and Appendix F).
: 6. The relationship between resident population and evacuating vehicles is developed from the telephone survey. Average values of 2.56 persons per household and 1.33 evacuating vehicles per household are used. The relationship between persons and vehicles for employees and transients is as follows:
: a. Employees: 1.08 employees per vehicle (telephone survey results) for all major employers.
: b. Parks: Vehicle occupancy varies based upon data gathered from local transient facilities.
: c. Special Events: Assumed transients attending the Webster Fathers Day Soccer Tournament show travel as families/households in a single vehicle, and used the average household size of 2.56 persons to estimate the number of vehicles.
R.E. Ginna Nuclear Power Plant                  21                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
2.2    Study Methodological Assumptions
: 1. ETE are presented for the evacuation of the 90th and 100th percentiles of population for each Region and for each Scenario. The percentile ETE is defined as the elapsed time from the Advisory to Evacuate issued to a specific Region of the EPZ, to the time that Region is clear of the indicated percentile of evacuees. A Region is defined as a group of ERPAs that is issued an Advisory to Evacuate. A scenario is a combination of circumstances, including time of day, day of week, season, and weather conditions.
: 2. The ETE are computed and presented in tabular format and graphically, in a format compliant with NUREG/CR7002.
: 3. Evacuation movements (paths of travel) are generally outbound relative to the plant to the extent permitted by the highway network. All major evacuation routes are used in the analysis.
: 4. Regions are defined by the underlying keyhole or circular configurations as specified in Section 1.4 of NUREG/CR7002. These Regions, as defined, display irregular boundaries reflecting the geography of the ERPAs included within these underlying configurations.
: 5. As indicated in Figure 22 of NUREG/CR7002, 100% of people within the impacted keyhole evacuate. 20% of those people within the EPZ, not within the impacted keyhole, will voluntarily evacuate. 20% of those people within the Shadow Region will voluntarily evacuate. See Figure 21 for a graphical representation of these evacuation percentages. Sensitivity studies explore the effect on ETE of increasing the percentage of voluntary evacuees in the Shadow Region (see Appendix M).
: 6. A total of 14 Scenarios representing different temporal variations (season, time of day, day of week) and weather conditions are considered. These Scenarios are outlined in Table 21.
: 7. Scenario 14 considers the closure of a State Route 404 just south of the intersection with Plank Road.
: 8. The models of the IDYNEV System were recognized as state of the art by the Atomic Safety & Licensing Board (ASLB) in past hearings. (Sources: Atomic Safety & Licensing Board Hearings on Seabrook and Shoreham; Urbanik1). The models have continuously been refined and extended since those hearings and were independently validated by a consultant retained by the NRC. The new DYNEV II model incorporates the latest technology in traffic simulation and in dynamic traffic assignment.
1 Urbanik, T., et. al. Benchmark Study of the IDYNEV Evacuation Time Estimate Computer Code, NUREG/CR4873, Nuclear Regulatory Commission, June, 1988.
R.E. Ginna Nuclear Power Plant                          22                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                Rev. 1
 
Table 21. Evacuation Scenario Definitions Day of          Time of Scenario        Season2            Week              Day          Weather              Special 1          Summer          Midweek          Midday          Good                None 2          Summer          Midweek          Midday          Rain                None 3          Summer          Weekend            Midday          Good                None 4          Summer          Weekend            Midday          Rain                None Midweek, 5          Summer                            Evening          Good                None Weekend 6            Winter          Midweek          Midday          Good                None 7            Winter          Midweek          Midday          Rain                None 8            Winter          Midweek          Midday          Snow                None 9            Winter        Weekend            Midday          Good                None 10            Winter        Weekend            Midday          Rain                None 11            Winter        Weekend            Midday          Snow                None Midweek, 12            Winter                          Evening          Good                None Weekend Webster Fathers Day 13          Summer          Weekend            Midday          Good Soccer Tournament Roadway Impact - Lane 14          Summer          Midweek          Midday          Good Closure on SR 104 WB 2
Winter assumes that school is in session (also applies to spring and autumn). Summer assumes that school is not in session.
R.E. Ginna Nuclear Power Plant                          23                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                  Rev. 1
 
Figure 21. Voluntary Evacuation Methodology R.E. Ginna Nuclear Power Plant                      24                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                  Rev. 1
 
2.3    Study Assumptions
: 1. The Planning Basis Assumption for the calculation of ETE is a rapidly escalating accident that requires evacuation, and includes the following:
: a. Advisory to Evacuate is announced coincident with the siren notification.
: b. Mobilization of the general population will commence within 15 minutes after siren notification.
: c. ETE are measured relative to the Advisory to Evacuate.
: 2. It is assumed that everyone within the group of ERPAs forming a Region that is issued an Advisory to Evacuate will, in fact, respond and evacuate in general accord with the planned routes.
: 3. 65 percent of the households in the EPZ have at least 1 commuter; 34 percent of those households with commuters will await the return of a commuter before beginning their evacuation trip, based on the telephone survey results. Therefore 22 percent (65% x 34% = 22%) of EPZ households will await the return of a commuter, prior to beginning their evacuation trip.
: 4. The ETE will also include consideration of through (ExternalExternal) trips during the time that such traffic is permitted to enter the evacuated Region. Normal traffic flow is assumed to be present within the EPZ at the start of the emergency.
: 5. Access Control Points (ACP) will be staffed within approximately 120 minutes following the siren notifications, to divert traffic attempting to enter the EPZ. Earlier activation of ACP locations could delay returning commuters. It is assumed that no through traffic will enter the EPZ after this 120 minute time period.
: 6. Traffic Control Points (TCP) within the EPZ will be staffed over time, beginning at the Advisory to Evacuate. Their number and location will depend on the Region to be evacuated and resources available. The objectives of these TCP are:
: a. Facilitate the movements of all (mostly evacuating) vehicles at the location.
: b. Discourage inadvertent vehicle movements towards the plant.
: c. Provide assurance and guidance to any traveler who is unsure of the appropriate actions or routing.
: d. Act as local surveillance and communications center.
: e. Provide information to the emergency operations center (EOC) as needed, based on direct observation or on information provided by travelers.
In calculating ETE, it is assumed that evacuees will drive safely, travel in directions identified in the plan, and obey all control devices and traffic guides.
R.E. Ginna Nuclear Power Plant                      25                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
: 7. Buses will be used to transport those without access to private vehicles:
: a. If schools are in session, transport (buses) will evacuate students directly to the designated receiving location.
: b. It is assumed parents will pick up children at day care centers prior to evacuation.
: c. Buses, wheelchair vans and ambulances will evacuate patients at medical facilities and at any senior facilities within the EPZ, as needed.
: d. Transitdependent general population will be evacuated to Reception Centers.
: e. Schoolchildren, if school is in session, are given priority in assigning transit vehicles.
: f. Bus mobilization time is considered in ETE calculations.
: g. Analysis of the number of required roundtrips (waves) of evacuating transit vehicles is presented.
: h. Transport of transitdependent evacuees from reception centers to congregate care centers is not considered in this study.
: 8. Provisions are made for evacuating the transitdependent portion of the general population to reception centers by bus, based on the assumption that some of these people will rideshare with family, neighbors, and friends, thus reducing the demand for buses. We assume that the percentage of people who rideshare is 50 percent. This assumption is based upon reported experience for other emergencies3, and on guidance in Section 2.2 of NUREG/CR7002.
: 9. Two types of adverse weather scenarios are considered. Rain may occur for either winter or summer scenarios; snow occurs in winter scenarios only. It is assumed that the rain or snow begins earlier or at about the same time the evacuation advisory is issued.
No weatherrelated reduction in the number of transients who may be present in the EPZ is assumed. It is assumed that roads are passable and that the appropriate agencies are plowing the roads as they would normally when snowing.
Adverse weather scenarios affect roadway capacity and the free flow highway speeds.
The factors applied for the ETE study are based on recent research on the effects of weather on roadway operations4; the factors are shown in Table 22.
3 Institute for Environmental Studies, University of Toronto, THE MISSISSAUGA EVACUATION FINAL REPORT, June 1981. The report indicates that 6,600 people of a transitdependent population of 8,600 people shared rides with other residents; a ride share rate of 76% (Page 510).
4 Agarwal, M. et. Al. Impacts of Weather on Urban Freeway Traffic Flow Characteristics and Facility Capacity, Proceedings of the 2005 MidContinent Transportation Research Symposium, August, 2005. The results of this paper are included as Exhibit 1015 in the HCM 2010.
R.E. Ginna Nuclear Power Plant                          26                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                  Rev. 1
: 10. School buses used to transport students are assumed to transport 70 students per bus for elementary schools and 50 students per bus for middle and high schools, based on discussions with county offices of emergency management. Transit buses used to transport the transitdependent general population are assumed to transport 30 people per bus.
Table 22. Model Adjustment for Adverse Weather Highway        Free Flow Scenario        Capacity*        Speed*        Mobilization Time for General Population Rain            90%            90%                        No Effect Clear driveway before leaving home Snow              80%            80%
(See Figure F13)
              *Adverse weather capacity and speed values are given as a percentage of good weather conditions. Roads are assumed to be passable.
R.E. Ginna Nuclear Power Plant                        27                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
3    DEMAND ESTIMATION The estimates of demand, expressed in terms of people and vehicles, constitute a critical element in developing an evacuation plan. These estimates consist of three components:
: 1. An estimate of population within the EPZ, stratified into groups (resident, employee, transient).
: 2. An estimate, for each population group, of mean occupancy per evacuating vehicle. This estimate is used to determine the number of evacuating vehicles.
: 3. An estimate of potential doublecounting of vehicles.
Appendix E presents much of the source material for the population estimates. Our primary source of population data, the 2010 Census, however, is not adequate for directly estimating some transient groups.
Throughout the year, vacationers and tourists enter the EPZ. These nonresidents may dwell within the EPZ for a short period (e.g. a few days or one or two weeks), or may enter and leave within one day. Estimates of the size of these population components must be obtained, so that the associated number of evacuating vehicles can be ascertained.
The potential for doublecounting people and vehicles must be addressed. For example:
A resident who works and shops within the EPZ could be counted as a resident, again as an employee and once again as a shopper.
A visitor who stays at a hotel and spends time at a park, then goes shopping could be counted three times.
Furthermore, the number of vehicles at a location depends on time of day. For example, motel parking lots may be full at dawn and empty at noon. Similarly, parking lots at area parks, which are full at noon, may be almost empty at dawn. Estimating counts of vehicles by simply adding up the capacities of different types of parking facilities will tend to overestimate the number of transients and can lead to ETE that are too conservative.
Analysis of the population characteristics of the Ginna EPZ indicates the need to identify three distinct groups:
Permanent residents  people who are year round residents of the EPZ.
Transients  people who reside outside of the EPZ who enter the area for a specific purpose (shopping, recreation) and then leave the area.
Employees  people who reside outside of the EPZ and commute to businesses within the EPZ on a daily basis.
Estimates of the population and number of evacuating vehicles for each of the population groups are presented for each ERPA and by polar coordinate representation (population rose).
The Ginna EPZ is subdivided into 16 ERPAs. The EPZ is shown in Figure 31.
R.E. Ginna Nuclear Power Plant                  31                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
3.1    Permanent Residents The primary source for estimating permanent population is the latest U.S. Census data. The average household size (2.56 persons/household - See Figure F1) and the number of evacuating vehicles per household (1.33 vehicles/household - See Figure F8) were adapted from the telephone survey results.
Population estimates are based upon Census 2010 data. The estimates are created by cutting the census block polygons by the ERPA and EPZ boundaries. A ratio of the original area of each census block and the updated area (after cutting) is multiplied by the total block population to estimate what the population is within the EPZ. This methodology assumes that the population is evenly distributed across a census block. Table 31 provides the permanent resident population within the EPZ, by ERPA based on this methodology.
The year 2010 permanent resident population is divided by the average household size and then multiplied by the average number of evacuating vehicles per household in order to estimate number of vehicles. Permanent resident population and vehicle estimates are presented in Table 32. Figure 32 and Figure 33 present the permanent resident population and permanent resident vehicle estimates by sector and distance from the Ginna Plant. This rose was constructed using GIS software.
It can be argued that this estimate of permanent residents overstates, somewhat, the number of evacuating vehicles, especially during the summer. It is certainly reasonable to assert that some portion of the population would be on vacation during the summer and would travel elsewhere. A rough estimate of this reduction can be obtained as follows:
Assume 50 percent of all households vacation for a twoweek period over the summer.
Assume these vacations, in aggregate, are uniformly dispersed over 10 weeks, i.e. 10 percent of the population is on vacation during each twoweek interval.
Assume half of these vacationers leave the area.
On this basis, the permanent resident population would be reduced by 5 percent in the summer and by a lesser amount in the offseason. Given the uncertainty in this estimate, we elected to apply no reductions in permanent resident population for the summer scenarios to account for residents who may be out of the area.
R.E. Ginna Nuclear Power Plant                  32                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Figure 31. R.E. Ginna Nuclear Power Plant EPZ R.E. Ginna Nuclear Power Plant                      33                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Table 31. EPZ Permanent Resident Population ERPA              2000 Population        2010 Population M1                    3,938                  4,721 M2                    477                    666 M3                    355                    1,039 M4                    6,903                  8,088 M5                    1,311                  1,323 M6                    6,831                  7,088 M7                    7,556                  9,525 M8                    3,074                  3,151 M9                    3,896                  3,931 W1                    3,817                  4,197 W2                    5,951                  5,939 W3                    1,064                  1,168 W4                    2,191                  2,117 W5                    3,916                  4,232 W6                    2,147                  2,189 W7                    4,509                  4,575 TOTAL                  57,936                  63,949 EPZ Population Growth:                      10.4%
Table 32. Permanent Resident Population and Vehicles by ERPA 2010 ERPA              2010 Population        Resident Vehicles M1                    4,721                  2,456 M2                    666                    344 M3                    1,039                    539 M4                    8,088                  4,204 M5                    1,323                    688 M6                    7,088                  3,683 M7                    9,525                  4,950 M8                    3,151                  1,639 M9                    3,931                  2,044 W1                    4,197                  2,180 W2                    5,939                  3,088 W3                    1,168                    609 W4                    2,117                  1,107 W5                    4,232                  2,201 W6                    2,189                  1,141 W7                    4,575                  2,380 TOTAL                  63,949                  33,253 R.E. Ginna Nuclear Power Plant                      34                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                            Rev. 1
 
Figure 32. Permanent Resident Population by Sector R.E. Ginna Nuclear Power Plant                      35                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure 33. Permanent Resident Vehicles by Sector R.E. Ginna Nuclear Power Plant                      36                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
3.2    Shadow Population A portion of the population living outside the evacuation area extending to 15 miles radially from the Ginna Plant (in the Shadow Region) may elect to evacuate without having been instructed to do so. Based upon NUREG/CR7002 guidance, it is assumed that 20 percent of the permanent resident population, based on U.S. Census Bureau data, in this Shadow Region will elect to evacuate.
Shadow population characteristics (household size, evacuating vehicles per household, mobilization time) are assumed to be the same as that for the EPZ permanent resident population. Table 33, Figure 34, and Figure 35 present estimates of the shadow population and vehicles, by sector.
Table 33. Shadow Population and Vehicles by Sector Sector              Population          Evacuating Vehicles N                      0                        0 NNE                      0                        0 NE                      0                        0 ENE                      0                        0 E                    874                      458 ESE                  3,944                    2,052 SE                  2,319                    1,206 SSE                  4,108                    2,138 S                  8,844                    4,595 SSW                  30,026                  15,607 SW                  41,503                  21,552 WSW                  56,666                  29,454 W                  5,033                    2,615 WNW                      0                        0 NW                      0                        0 NNW                      0                        0 TOTAL                153,317                  79,677 R.E. Ginna Nuclear Power Plant                      37                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                            Rev. 1
 
Figure 34. Shadow Population by Sector R.E. Ginna Nuclear Power Plant                  38                  KLD Engineering, P.C.
Evacuation Time Estimate                                                            Rev. 1
 
Figure 35. Shadow Vehicles by Sector R.E. Ginna Nuclear Power Plant                  39                  KLD Engineering, P.C.
Evacuation Time Estimate                                                          Rev. 1
 
3.3    Transient Population Transient population groups are defined as those people (who are not permanent residents, nor commuting employees) who enter the EPZ for a specific purpose (shopping, recreation).
Transients may spend less than one day or stay overnight at lodging facilities. Data for all facilities was provided by the counties. The Ginna EPZ has a number of areas and facilities that attract transients, including:
Golf Courses - 240 transients in 95 vehicles Lodging Facilities - 720 transients in 360 vehicles Marinas - 267 transients in 104 vehicles Parks - 875 transients in 327 vehicles Appendix E summarizes the transient data that was estimated for the EPZ. Table E5 presents the number of transients visiting recreational areas, while Table E6 presents the number of transients at lodging facilities within the EPZ.
Table 34 presents transient population and transient vehicle estimates by ERPA. Figure 36 and Figure 37 present these data by sector and distance from the plant.
Table 34. Summary of Transients and Transient Vehicles ERPA                Transients          Transient Vehicles M1                    125                      49 M2                    0                        0 M3                    114                      45 M4                    111                      43 M5                    0                        0 M6                    750                    320 M7                    234                    105 M8                    75                      30 M9                    0                        0 W1                      0                        0 W2                    296                    139 W3                    259                    101 W4                      8                        3 W5                      0                        0 W6                      0                        0 W7                    130                      51 TOTAL                  2,102                    886 R.E. Ginna Nuclear Power Plant                      310                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                            Rev. 1
 
Figure 36. Transient Population by Sector R.E. Ginna Nuclear Power Plant                    311                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                Rev. 1
 
Figure 37. Transient Vehicles by Sector R.E. Ginna Nuclear Power Plant                  312                  KLD Engineering, P.C.
Evacuation Time Estimate                                                              Rev. 1
 
3.4      Employees Employees who work within the EPZ fall into two categories:
Those who live and work in the EPZ Those who live outside of the EPZ and commute to jobs within the EPZ.
Those of the first category are already counted as part of the permanent resident population. To avoid double counting, we focus only on those employees commuting from outside the EPZ who will evacuate along with the permanent resident population.
Data provided by Wayne and Monroe counties were used to estimate the number of employees commuting into the EPZ for those employers who did not provide data.
In Table E4, the Employees (Max Shift) is multiplied by the percent NonEPZ factor to determine the number of employees who are not residents of the EPZ. A vehicle occupancy of 1.08 employees per vehicle obtained from the telephone survey (See Figure F7) was used to determine the number of evacuating employee vehicles for all major employers.
Table 35 presents nonEPZ Resident employee and vehicle estimates by ERPA. Figure 38 and Figure 39 present these data by sector.
R.E. Ginna Nuclear Power Plant                313                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Table 35. Summary of NonEPZ Resident Employees and Employee Vehicles ERPA              Employees          Employee Vehicles M1                  275                    255 M2                    0                    0 M3                  7,350                  6,806 M4                    25                    24 M5                    0                    0 M6                    0                    0 M7                  153                    143 M8                    0                    0 M9                    0                    0 W1                  225                    209 W2                  202                    189 W3                    0                    0 W4                  187                    174 W5                    0                    0 W6                    0                    0 W7                    0                    0 TOTAL                  8,417                  7,800 R.E. Ginna Nuclear Power Plant                    314                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
Figure 38. Employee Population by Sector R.E. Ginna Nuclear Power Plant                  315                    KLD Engineering, P.C.
Evacuation Time Estimate                                                              Rev. 1
 
Figure 39. Employee Vehicles by Sector R.E. Ginna Nuclear Power Plant                  316                  KLD Engineering, P.C.
Evacuation Time Estimate                                                            Rev. 1
 
3.5    Medical Facilities Data were provided by the counties for each of the medical facilities within the EPZ. Table E3 in Appendix E summarizes the data gathered. Section 8 details the evacuation of medical facilities and their patients. The number and type of evacuating vehicles that need to be provided depend on the patients' state of health. It is estimated that buses can transport up to 30 people; wheelchair vans, up to 4 people; wheelchair buses up to 15 people; and ambulances, up to 2 people.
3.6    Total Demand in Addition to Permanent Population Vehicles will be traveling through the EPZ (externalexternal trips) at the time of an accident.
After the Advisory to Evacuate is announced, these throughtravelers will also evacuate. These through vehicles are assumed to travel on the major routes traversing the EPZ - State Route 104, I590 and I490. It is assumed that this traffic will continue to enter the EPZ during the first 120 minutes following the Advisory to Evacuate.
Average Annual Daily Traffic (AADT) data was obtained from Federal Highway Administration to estimate the number of vehicles per hour on the aforementioned routes. The AADT was multiplied by the KFactor, which is the proportion of the AADT on a roadway segment or link during the design hour, resulting in the design hour volume (DHV). The design hour is usually the 30th highest hourly traffic volume of the year, measured in vehicles per hour (vph). The DHV is then multiplied by the DFactor, which is the proportion of the DHV occurring in the peak direction of travel (also known as the directional split). The resulting values are the directional design hourly volumes (DDHV), and are presented in Table 36, for each of the routes considered. The DDHV is then multiplied by 2 hours (access control points - ACP - are assumed to be activated at 120 minutes after the advisory to evacuate) to estimate the total number of external vehicles loaded on the analysis network. As indicated, there are 17,134 vehicles entering the EPZ as externalexternal trips prior to the activation of the ACP and the diversion of this traffic. This number is reduced by 60% for evening scenarios (Scenarios 5 and
: 12) as discussed in Section 6.
3.7    Special Event One special event (Scenario 13) is considered for the ETE study - the Webster Fathers Day Soccer Tournament. Data were obtained from the county indicating that 5,000 people attended the event, 50% of which traveled from beyond the EPZ boundary. Using the average household size of 2.56 as an estimated vehicle occupancy rate yields a total of 977 additional transit vehicles that were incorporated at various parking locations around the event. The special event vehicle trips were generated utilizing the same mobilization distributions for transients. Public transportation is not provided for this event and was not considered in the special event analysis.
R.E. Ginna Nuclear Power Plant                  317                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
Table 36. R.E. Ginna Nuclear Power Plant EPZ External Traffic Upstream        Downstream                                                        HPMS1                                                Hourly          External Node              Node            Road Name            Direction              AADT                KFactor2              DFactor2 Volume            Traffic 8061                61              SR 104                  WB                7,574                0.118                  0.5      447              894 8049                49              SR 104                  EB                15,147                0.116                  0.5      879              1,758 8004                4                I590                  NB                7,574                0.118                  0.5      447              894 8189              169                I490                  NB                74,657                0.091                  0.5    3,397            6,794 8185              185                I490                  SB                74,657                0.091                  0.5    3,397            6,794 TOTAL:        17,134 1
Highway Performance Monitoring System (HPMS), Federal Highway Administration (FHWA), Washington, D.C., 2011 2
HCM 2010 R.E. Ginna Nuclear Power Plant                                                      318                                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                                      Rev. 1
 
3.8    Summary of Demand A summary of population and vehicle demand is provided in Table 37 and Table 38, respectively. This summary includes all population groups described in this section. Additional population groups - transitdependent, special facility and school population - are described in greater detail in Section 8. A total of 125,322 people and 75,780 vehicles are considered in this study.
R.E. Ginna Nuclear Power Plant                  319                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Table 37. Summary of Population Demand Transit                                    Special  Schools &      Shadow    External ERPA    Residents Dependent Transients Employees Facilities                  Preschools    Population Traffic    Total M1        4,721          151            125              275          0        589            0        0      5,861 M2        666            21              0                0          0        0              0        0        687 M3        1,039            33            114            7,350          0        0              0        0      8,536 M4        8,088          259            111              25          73      1,814            0        0      10,370 M5        1,323            42              0                0          0        0              0        0      1,365 M6        7,088          227            750                0          0      1,461            0        0      9,526 M7        9,525          305            234              153        372      1,953            0        0      12,542 M8        3,151          101            75                0          0        0              0        0      3,327 M9        3,931          126              0                0          0      2,744            0        0      6,801 W1        4,197          134              0              225          10        0              0        0      4,566 W2        5,939          190            296              202          2      2,954            0        0      9,583 W3        1,168            37            259                0          0        0              0        0      1,464 W4        2,117            68              8              187          0        24            0        0      2,404 W5        4,232          135              0                0          7      2,044            0        0      6,418 W6        2,189            70              0                0          0        639            0        0      2,898 W7        4,575          146            130                0          28        366            0        0      5,245 Shadow        0              0              0                0          0      3,065        30,663      0      33,728 Total      63,949          2,046          2,102          8,417        492      17,653        30,663      0    125,322 NOTE: Shadow Population has been reduced to 20%. Refer to Figure 21 for additional information.
NOTE: Special Facilities included are all medical facilities.
R.E. Ginna Nuclear Power Plant                                                320                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                    Rev. 1
 
Table 38. Summary of Vehicle Demand Transit                                  Special      Schools &      Shadow  External ERPA    Residents Dependent Transients Employees Facilities Preschools Population Traffic                      Total M1        2,456        10            49            255            0            16              0      0    2,786 M2          344          2            0            0              0            0              0      0      346 M3          539          2            45          6,806            0            0              0      0    7,392 M4        4,204        18            43            24            12            52              0      0    4,353 M5          688          4            0            0              0            0              0      0      692 M6        3,683        16          320            0              0            44              0      0    4,063 M7        4,950        20          105            143            38            56              0      0    5,312 M8        1,639        6            30            0              0            0              0      0    1,675 M9        2,044        8            0            0              0            78              0      0    2,130 W1        2,180        10            0            209            4            0              0      0    2,403 W2        3,088        12          139            189            4            112            0      0    3,524 W3          609          2          101            0              0            0              0      0      712 W4        1,107        4            3            174            0            2              0      0    1,290 W5        2,201        10            0            0              4            82              0      0    2,283 W6        1,141        4            0            0              0            26              0      0    1,169 W7        2,380        10            51            0              4            12              0      0    2,455 Shadow          0          0            0            0              0            88          15,935  17,134  33,153 Total      33,253      138          886          7,800          66            568          15,935  17,134  75,780 NOTE: Buses represented as two passenger vehicles. Refer to Section 8 for additional information.
R.E. Ginna Nuclear Power Plant                                          321                                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                    Rev. 1
 
4    ESTIMATION OF HIGHWAY CAPACITY The ability of the road network to service vehicle demand is a major factor in determining how rapidly an evacuation can be completed. The capacity of a road is defined as the maximum hourly rate at which persons or vehicles can reasonably be expected to traverse a point or uniform section of a lane of roadway during a given time period under prevailing roadway, traffic and control conditions, as stated in the 2010 Highway Capacity Manual (HCM 2010).
In discussing capacity, different operating conditions have been assigned alphabetical designations, A through F, to reflect the range of traffic operational characteristics. These designations have been termed "Levels of Service" (LOS). For example, LOS A connotes freeflow and highspeed operating conditions; LOS F represents a forced flow condition. LOS E describes traffic operating at or near capacity.
Another concept, closely associated with capacity, is Service Volume (SV). Service volume is defined as The maximum hourly rate at which vehicles, bicycles or persons reasonably can be expected to traverse a point or uniform section of a roadway during an hour under specific assumed conditions while maintaining a designated level of service. This definition is similar to that for capacity. The major distinction is that values of SV vary from one LOS to another, while capacity is the service volume at the upper bound of LOS E, only.
This distinction is illustrated in Exhibit 1117 of the HCM 2010. As indicated there, the SV varies with Free Flow Speed (FFS), and LOS. The SV is calculated by the DYNEV II simulation model, based on the specified link attributes, FFS, capacity, control device and traffic demand.
Other factors also influence capacity. These include, but are not limited to:
Lane width Shoulder width Pavement condition Horizontal and vertical alignment (curvature and grade)
Percent truck traffic Control device (and timing, if it is a signal)
Weather conditions (rain, snow, fog, wind speed, ice)
These factors are considered during the road survey and in the capacity estimation process; some factors have greater influence on capacity than others. For example, lane and shoulder width have only a limited influence on Base Free Flow Speed (BFFS1) according to Exhibit 157 of the HCM. Consequently, lane and shoulder widths at the narrowest points were observed during the road survey and these observations were recorded, but no detailed measurements of lane or shoulder width were taken. Horizontal and vertical alignment can influence both FFS and capacity. The estimated FFS were measured using the survey vehicles speedometer and observing local traffic, under free flow conditions. Capacity is estimated from the procedures of 1
A very rough estimate of BFFS might be taken as the posted speed limit plus 10 mph (HCM 2010 Page 1515)
R.E. Ginna Nuclear Power Plant                        41                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                Rev. 1
 
the 2010 HCM. For example, HCM Exhibit 71(b) shows the sensitivity of Service Volume at the upper bound of LOS D to grade (capacity is the Service Volume at the upper bound of LOS E).
As discussed in Section 2.3, it is necessary to adjust capacity figures to represent the prevailing conditions during inclement weather. Based on limited empirical data, weather conditions such as rain reduce the values of free speed and of highway capacity by approximately 10 percent. Over the last decade new studies have been made on the effects of rain on traffic capacity. These studies indicate a range of effects between 5 and 20 percent depending on wind speed and precipitation rates. As indicated in Section 2.3, we employ a reduction in free speed and in highway capacity of 10 percent and 20 percent for rain and snow, respectively.
Since congestion arising from evacuation may be significant, estimates of roadway capacity must be determined with great care. Because of its importance, a brief discussion of the major factors that influence highway capacity is presented in this section.
Rural highways generally consist of: (1) one or more uniform sections with limited access (driveways, parking areas) characterized by uninterrupted flow; and (2) approaches to at grade intersections where flow can be interrupted by a control device or by turning or crossing traffic at the intersection. Due to these differences, separate estimates of capacity must be made for each section. Often, the approach to the intersection is widened by the addition of one or more lanes (turn pockets or turn bays), to compensate for the lower capacity of the approach due to the factors there that can interrupt the flow of traffic. These additional lanes are recorded during the field survey and later entered as input to the DYNEV II system.
4.1    Capacity Estimations on Approaches to Intersections Atgrade intersections are apt to become the first bottleneck locations under local heavy traffic volume conditions. This characteristic reflects the need to allocate access time to the respective competing traffic streams by exerting some form of control. During evacuation, control at critical intersections will often be provided by traffic control personnel assigned for that purpose, whose directions may supersede traffic control devices. The existing traffic management plans documented in the county emergency plans are extensive and were adopted without change.
The perlane capacity of an approach to a signalized intersection can be expressed (simplistically) in the following form:
3600                    3600 where:
Qcap,m          =      Capacity of a single lane of    traffic on an approach, which executes R.E. Ginna Nuclear Power Plant                  42                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
movement, m, upon entering the intersection; vehicles per hour (vph) hm              =      Mean queue discharge headway of vehicles on this lane that are executing movement, m; seconds per vehicle G                =      Mean duration of GREEN time servicing vehicles that are executing movement, m, for each signal cycle; seconds L                =      Mean "lost time" for each signal phase servicing movement, m; seconds C                =      Duration of each signal cycle; seconds Pm              =      Proportion of GREEN time allocated for vehicles executing movement, m, from this lane. This value is specified as part of the control treatment.
m                =      The movement executed by vehicles after they enter the intersection: through, leftturn, rightturn, and diagonal.
The turnmovementspecific mean discharge headway hm, depends in a complex way upon many factors: roadway geometrics, turn percentages, the extent of conflicting traffic streams, the control treatment, and others. A primary factor is the value of "saturation queue discharge headway", hsat, which applies to through vehicles that are not impeded by other conflicting traffic streams. This value, itself, depends upon many factors including motorist behavior.
Formally, we can write, where:
hsat            =      Saturation discharge headway for through vehicles; seconds per vehicle F1,F2            =      The various known factors influencing hm fm( )            =      Complex function relating hm to the known (or estimated) values of hsat, F1, F2, The estimation of hm for specified values of hsat, F1, F2, ... is undertaken within the DYNEV II simulation model by a mathematical model2. The resulting values for hm always satisfy the condition:
2 Lieberman, E., "Determining Lateral Deployment of Traffic on an Approach to an Intersection", McShane, W. &
Lieberman, E., "Service Rates of Mixed Traffic on the far Left Lane of an Approach". Both papers appear in Transportation Research Record 772, 1980. Lieberman, E., Xin, W., Macroscopic Traffic Modeling For LargeScale Evacuation Planning, presented at the TRB 2012 Annual Meeting, January 2226, 2012 R.E. Ginna Nuclear Power Plant                      43                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                Rev. 1
 
That is, the turnmovementspecific discharge headways are always greater than, or equal to the saturation discharge headway for through vehicles. These headways (or its inverse equivalent, saturation flow rate), may be determined by observation or using the procedures of the HCM 2010.
The above discussion is necessarily brief given the scope of this ETE report and the complexity of the subject of intersection capacity. In fact, Chapters 18, 19 and 20 in the HCM 2010 address this topic. The factors, F1, F2,, influencing saturation flow rate are identified in equation (185) of the HCM 2010.
The traffic signals within the EPZ and Shadow Region are modeled using representative phasing plans and phase durations obtained as part of the field data collection. Traffic responsive signal installations allow the proportion of green time allocated (Pm) for each approach to each intersection to be determined by the expected traffic volumes on each approach during evacuation circumstances. The amount of green time (G) allocated is subject to maximum and minimum phase duration constraints; 2 seconds of yellow time are indicated for each signal phase and 1 second of allred time is assigned between signal phases, typically. If a signal is pre timed, the yellow and allred times observed during the road survey are used. A lost time (L) of 2.0 seconds is used for each signal phase in the analysis.
4.2    Capacity Estimation along Sections of Highway The capacity of highway sections  as distinct from approaches to intersections  is a function of roadway geometrics, traffic composition (e.g. percent heavy trucks and buses in the traffic stream) and, of course, motorist behavior. There is a fundamental relationship which relates service volume (i.e. the number of vehicles serviced within a uniform highway section in a given time period) to traffic density. The top curve in Figure 41 illustrates this relationship.
As indicated, there are two flow regimes: (1) Free Flow (left side of curve); and (2) Forced Flow (right side). In the Free Flow regime, the traffic demand is fully serviced; the service volume increases as demand volume and density increase, until the service volume attains its maximum value, which is the capacity of the highway section. As traffic demand and the resulting highway density increase beyond this "critical" value, the rate at which traffic can be serviced (i.e. the service volume) can actually decline below capacity (capacity drop). Therefore, in order to realistically represent traffic performance during congested conditions (i.e. when demand exceeds capacity), it is necessary to estimate the service volume, VF, under congested conditions.
The value of VF can be expressed as:
where:
R              =      Reduction factor which is less than unity R.E. Ginna Nuclear Power Plant                    44                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
We have employed a value of R=0.90. The advisability of such a capacity reduction factor is based upon empirical studies that identified a falloff in the service flow rate when congestion occurs at bottlenecks or choke points on a freeway system. Zhang and Levinson3 describe a research program that collected data from a computerbased surveillance system (loop detectors) installed on the Interstate Highway System, at 27 active bottlenecks in the twin cities metro area in Minnesota over a 7week period. When flow breakdown occurs, queues are formed which discharge at lower flow rates than the maximum capacity prior to observed breakdown. These queue discharge flow (QDF) rates vary from one location to the next and also vary by day of week and time of day based upon local circumstances. The cited reference presents a mean QDF of 2,016 passenger cars per hour per lane (pcphpl). This figure compares with the nominal capacity estimate of 2,250 pcphpl estimated for the ETE and indicated in Appendix K for freeway links. The ratio of these two numbers is 0.896 which translates into a capacity reduction factor of 0.90.
Since the principal objective of evacuation time estimate analyses is to develop a realistic estimate of evacuation times, use of the representative value for this capacity reduction factor (R=0.90) is justified. This factor is applied only when flow breaks down, as determined by the simulation model.
Rural roads, like freeways, are classified as uninterrupted flow facilities. (This is in contrast with urban street systems which have closely spaced signalized intersections and are classified as interrupted flow facilities.) As such, traffic flow along rural roads is subject to the same effects as freeways in the event traffic demand exceeds the nominal capacity, resulting in queuing and lower QDF rates. As a practical matter, rural roads rarely break down at locations away from intersections. Any breakdowns on rural roads are generally experienced at intersections where other model logic applies, or at lane drops which reduce capacity there.
Therefore, the application of a factor of 0.90 is appropriate on rural roads, but rarely, if ever, activated.
The estimated value of capacity is based primarily upon the type of facility and on roadway geometrics. Sections of roadway with adverse geometrics are characterized by lower freeflow speeds and lane capacity. Exhibit 1530 in the Highway Capacity Manual was referenced to estimate saturation flow rates. The impact of narrow lanes and shoulders on freeflow speed and on capacity is not material, particularly when flow is predominantly in one direction as is the case during an evacuation.
The procedure used here was to estimate "section" capacity, VE, based on observations made traveling over each section of the evacuation network, based on the posted speed limits and travel behavior of other motorists and by reference to the 2010 HCM. The DYNEV II simulation model determines for each highway section, represented as a network link, whether its capacity would be limited by the "sectionspecific" service volume, VE, or by the intersectionspecific capacity. For each link, the model selects the lower value of capacity.
3 Lei Zhang and David Levinson, Some Properties of Flows at Freeway Bottlenecks, Transportation Research Record 1883, 2004.
R.E. Ginna Nuclear Power Plant                      45                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                            Rev. 1
 
4.3    Application to the R.E. Ginna Nuclear Power Plant Study Area As part of the development of the linknode analysis network for the study area, an estimate of roadway capacity is required. The source material for the capacity estimates presented herein is contained in:
2010 Highway Capacity Manual (HCM)
Transportation Research Board National Research Council Washington, D.C.
The highway system in the study area consists primarily of three categories of roads and, of course, intersections:
TwoLane roads: Local, State MultiLane Highways (atgrade)
Freeways Each of these classifications will be discussed.
4.3.1 TwoLane Roads Ref: HCM Chapter 15 Two lane roads comprise the majority of highways within the EPZ. The perlane capacity of a twolane highway is estimated at 1700 passenger cars per hour (pc/h). This estimate is essentially independent of the directional distribution of traffic volume except that, for extended distances, the twoway capacity will not exceed 3200 pc/h. The HCM procedures then estimate Level of Service (LOS) and Average Travel Speed. The DYNEV II simulation model accepts the specified value of capacity as input and computes average speed based on the timevarying demand: capacity relations.
Based on the field survey and on expected traffic operations associated with evacuation scenarios:
Most sections of twolane roads within the EPZ are classified as Class I, with "level terrain"; some are rolling terrain.
Class II highways are mostly those within urban and suburban centers.
4.3.2 MultiLane Highway Ref: HCM Chapter 14 Exhibit 142 of the HCM 2010 presents a set of curves that indicate a perlane capacity ranging from approximately 1900 to 2200 pc/h, for freespeeds of 45 to 60 mph, respectively. Based on observation, the multilane highways outside of urban areas within the EPZ service traffic with freespeeds in this range. The actual timevarying speeds computed by the simulation model reflect the demand: capacity relationship and the impact of control at intersections. A R.E. Ginna Nuclear Power Plant                  46                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
conservative estimate of perlane capacity of 1900 pc/h is adopted for this study for multilane highways outside of urban areas, as shown in Appendix K.
4.3.3 Freeways Ref: HCM Chapters 10, 11, 12, 13 Chapter 10 of the HCM 2010 describes a procedure for integrating the results obtained in Chapters 11, 12 and 13, which compute capacity and LOS for freeway components. Chapter 10 also presents a discussion of simulation models. The DYNEV II simulation model automatically performs this integration process.
Chapter 11 of the HCM 2010 presents procedures for estimating capacity and LOS for Basic Freeway Segments". Exhibit 1117 of the HCM 2010 presents capacity vs. free speed estimates, which are provided below.
Free Speed (mph):                  55      60      65      70+
PerLane Capacity (pc/h):        2250      2300    2350    2400 The inputs to the simulation model are highway geometrics, freespeeds and capacity based on field observations. The simulation logic calculates actual timevarying speeds based on demand:
capacity relationships. A conservative estimate of perlane capacity of 2250 pc/h is adopted for this study for freeways, as shown in Appendix K.
Chapter 12 of the HCM 2010 presents procedures for estimating capacity, speed, density and LOS for freeway weaving sections. The simulation model contains logic that relates speed to demand volume: capacity ratio. The value of capacity obtained from the computational procedures detailed in Chapter 12 depends on the "Type" and geometrics of the weaving segment and on the "Volume Ratio" (ratio of weaving volume to total volume).
Chapter 13 of the HCM 2010 presents procedures for estimating capacities of ramps and of "merge" areas. There are three significant factors to the determination of capacity of a ramp freeway junction: The capacity of the freeway immediately downstream of an onramp or immediately upstream of an offramp; the capacity of the ramp roadway; and the maximum flow rate entering the ramp influence area. In most cases, the freeway capacity is the controlling factor. Values of this merge area capacity are presented in Exhibit 138 of the HCM 2010, and depend on the number of freeway lanes and on the freeway free speed. Ramp capacity is presented in Exhibit 1310 and is a function of the ramp free flow speed. The DYNEV II simulation model logic simulates the merging operations of the ramp and freeway traffic in accord with the procedures in Chapter 13 of the HCM 2010. If congestion results from an excess of demand relative to capacity, then the model allocates service appropriately to the two entering traffic streams and produces LOS F conditions (The HCM does not address LOS F explicitly).
R.E. Ginna Nuclear Power Plant                  47                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
4.3.4 Intersections Ref: HCM Chapters 18, 19, 20, 21 Procedures for estimating capacity and LOS for approaches to intersections are presented in Chapter 18 (signalized intersections), Chapters 19, 20 (unsignalized intersections) and Chapter 21 (roundabouts). The complexity of these computations is indicated by the aggregate length of these chapters. The DYNEV II simulation logic is likewise complex.
The simulation model explicitly models intersections: Stop/yield controlled intersections (both 2way and allway) and traffic signal controlled intersections. Where intersections are controlled by fixed time controllers, traffic signal timings are set to reflect average (non evacuation) traffic conditions. Actuated traffic signal settings respond to the timevarying demands of evacuation traffic to adjust the relative capacities of the competing intersection approaches.
The model is also capable of modeling the presence of manned traffic control. At specific locations where it is advisable or where existing plans call for overriding existing traffic control to implement manned control, the model will use actuated signal timings that reflect the presence of traffic guides. At locations where a special traffic control strategy (continuous left turns, contraflow lanes) is used, the strategy is modeled explicitly. Where applicable, the location and type of traffic control for nodes in the evacuation network are noted in Appendix K. The characteristics of the ten highest volume signalized intersections are detailed in Appendix J.
4.4    Simulation and Capacity Estimation Chapter 6 of the HCM is entitled, HCM and Alternative Analysis Tools. The chapter discusses the use of alternative tools such as simulation modeling to evaluate the operational performance of highway networks. Among the reasons cited in Chapter 6 to consider using simulation as an alternative analysis tool is:
The system under study involves a group of different facilities or travel modes with mutual interactions invoking several procedural chapters of the HCM. Alternative tools are able to analyze these facilities as a single system.
This statement succinctly describes the analyses required to determine traffic operations across an area encompassing an EPZ operating under evacuation conditions. The model utilized for this study, DYNEV II, is further described in Appendix C. It is essential to recognize that simulation models do not replicate the methodology and procedures of the HCM - they replace these procedures by describing the complex interactions of traffic flow and computing Measures of Effectiveness (MOE) detailing the operational performance of traffic over time and by location. The DYNEV II simulation model includes some HCM 2010 procedures only for the purpose of estimating capacity.
All simulation models must be calibrated properly with field observations that quantify the performance parameters applicable to the analysis network. Two of the most important of R.E. Ginna Nuclear Power Plant                    48                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
these are: (1) Free flow speed (FFS); and (2) saturation headway, hsat. The first of these is estimated by direct observation during the road survey; the second is estimated using the concepts of the HCM 2010, as described earlier. These parameters are listed in Appendix K, for each network link.
Volume, vph Capacity Drop Qmax R Qmax Qs Density, vpm Flow Regimes Speed, mph Free    Forced vf R vc Density, vpm kf          kopt                            kj ks Figure 41. Fundamental Diagrams R.E. Ginna Nuclear Power Plant                        49                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
5      ESTIMATION OF TRIP GENERATION TIME Federal Government guidelines (see NUREG CR7002) specify that the planner estimate the distributions of elapsed times associated with mobilization activities undertaken by the public to prepare for the evacuation trip. The elapsed time associated with each activity is represented as a statistical distribution reflecting differences between members of the public.
The quantification of these activitybased distributions relies largely on the results of the telephone survey. We define the sum of these distributions of elapsed times as the Trip Generation Time Distribution.
5.1      Background In general, an accident at a nuclear power plant is characterized by the following Emergency Classification Levels (see Appendix 1 of NUREG 0654 for details):
: 1. Unusual Event
: 2. Alert
: 3. Site Area Emergency
: 4. General Emergency At each level, the Federal guidelines specify a set of Actions to be undertaken by the Licensee, and by State and Local offsite authorities. As a Planning Basis, we will adopt a conservative posture, in accordance with Section 1.2 of NUREG/CR7002, that a rapidly escalating accident will be considered in calculating the Trip Generation Time. We will assume:
: 1. The Advisory to Evacuate will be announced coincident with the siren notification.
: 2. Mobilization of the general population will commence within 15 minutes after the siren notification.
: 3. ETE are measured relative to the Advisory to Evacuate.
We emphasize that the adoption of this planning basis is not a representation that these events will occur within the indicated time frame. Rather, these assumptions are necessary in order to:
: 1. Establish a temporal framework for estimating the Trip Generation distribution in the format recommended in Section 2.13 of NUREG/CR6863.
: 2. Identify temporal points of reference that uniquely define "Clear Time" and ETE.
It is likely that a longer time will elapse between the various classes of an emergency.
For example, suppose one hour elapses from the siren alert to the Advisory to Evacuate. In this case, it is reasonable to expect some degree of spontaneous evacuation by the public during this onehour period. As a result, the population within the EPZ will be lower when the Advisory to Evacuate is announced, than at the time of the siren alert. In addition, many will engage in preparation activities to evacuate, in anticipation that an Advisory will be broadcast.
Thus, the time needed to complete the mobilization activities and the number of people remaining to evacuate the EPZ after the Advisory to Evacuate, will both be somewhat less than R.E. Ginna Nuclear Power Plant                    51                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
the estimates presented in this report. Consequently, the ETE presented in this report are higher than the actual evacuation time, if this hypothetical situation were to take place.
The notification process consists of two events:
: 1. Transmitting information using the alert notification systems available within the EPZ (e.g. sirens, tone alerts, EAS broadcasts, loud speakers).
: 2. Receiving and correctly interpreting the information that is transmitted.
The population within the EPZ is dispersed over an area of approximately 157 square miles and is engaged in a wide variety of activities. It must be anticipated that some time will elapse between the transmission and receipt of the information advising the public of an accident.
The amount of elapsed time will vary from one individual to the next depending on where that person is, what that person is doing, and related factors. Furthermore, some persons who will be directly involved with the evacuation process may be outside the EPZ at the time the emergency is declared. These people may be commuters, shoppers and other travelers who reside within the EPZ and who will return to join the other household members upon receiving notification of an emergency.
As indicated in Section 2.13 of NUREG/CR6863, the estimated elapsed times for the receipt of notification can be expressed as a distribution reflecting the different notification times for different people within, and outside, the EPZ. By using time distributions, it is also possible to distinguish between different population groups and different dayofweek and timeofday scenarios, so that accurate ETE may be computed.
For example, people at home or at work within the EPZ will be notified by siren, and/or tone alert and/or radio (if available). Those well outside the EPZ will be notified by telephone, radio, TV and wordofmouth, with potentially longer time lags. Furthermore, the spatial distribution of the EPZ population will differ with time of day  families will be united in the evenings, but dispersed during the day. In this respect, weekends will differ from weekdays.
As indicated in Section 4.1 of NUREG/CR7002, the information required to compute trip generation times is typically obtained from a telephone survey of EPZ residents. Such a survey was conducted in support of this ETE study. Appendix F presents the survey sampling plan, survey instrument, and raw survey results. It is important to note that the shape and duration of the evacuation trip mobilization distribution is important at sites where traffic congestion is not expected to cause the evacuation time estimate to extend in time well beyond the trip generation period. The remaining discussion will focus on the application of the trip generation data obtained from the telephone survey to the development of the ETE documented in this report.
R.E. Ginna Nuclear Power Plant                    52                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
5.2    Fundamental Considerations The environment leading up to the time that people begin their evacuation trips consists of a sequence of events and activities. Each event (other than the first) occurs at an instant in time and is the outcome of an activity.
Activities are undertaken over a period of time. Activities may be in "series" (i.e. to undertake an activity implies the completion of all preceding events) or may be in parallel (two or more activities may take place over the same period of time). Activities conducted in series are functionally dependent on the completion of prior activities; activities conducted in parallel are functionally independent of one another. The relevant events associated with the public's preparation for evacuation are:
Event Number          Event Description 1          Notification 2          Awareness of Situation 3          Depart Work 4          Arrive Home 5          Depart on Evacuation Trip Associated with each sequence of events are one or more activities, as outlined below:
Table 51. Event Sequence for Evacuation Activities Event Sequence                    Activity                  Distribution 12              Receive Notification                        1 23              Prepare to Leave Work                        2 2,3  4          Travel Home                                  3 2,4  5          Prepare to Leave to Evacuate                4 N/A            Snow Clearance                              5 These relationships are shown graphically in Figure 51.
An Event is a state that exists at a point in time (e.g., depart work, arrive home)
An Activity is a process that takes place over some elapsed time (e.g., prepare to leave work, travel home)
As such, a completed Activity changes the state of an individual (e.g. the activity, travel home changes the state from depart work to arrive home). Therefore, an Activity can be described as an Event Sequence; the elapsed times to perform an event sequence vary from one person to the next and are described as statistical distributions on the following pages.
An employee who lives outside the EPZ will follow sequence (c) of Figure 51. A household R.E. Ginna Nuclear Power Plant                        53                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                  Rev. 1
 
within the EPZ that has one or more commuters at work, and will await their return before beginning the evacuation trip will follow the first sequence of Figure 51(a). A household within the EPZ that has no commuters at work, or that will not await the return of any commuters, will follow the second sequence of Figure 51(a), regardless of day of week or time of day.
Households with no commuters on weekends or in the evening/nighttime, will follow the applicable sequence in Figure 51(b). Transients will always follow one of the sequences of Figure 51(b). Some transients away from their residence could elect to evacuate immediately without returning to the residence, as indicated in the second sequence.
It is seen from Figure 51, that the Trip Generation time (i.e. the total elapsed time from Event 1 to Event 5) depends on the scenario and will vary from one household to the next.
Furthermore, Event 5 depends, in a complicated way, on the time distributions of all activities preceding that event. That is, to estimate the time distribution of Event 5, we must obtain estimates of the time distributions of all preceding events. For this study, we adopt the conservative posture that all activities will occur in sequence.
In some cases, assuming certain events occur strictly sequential (for instance, commuter returning home before beginning preparation to leave, or removing snow only after the preparation to leave) can result in rather conservative (that is, longer) estimates of mobilization times. It is reasonable to expect that at least some parts of these events will overlap for many households, but that assumption is not made in this study.
R.E. Ginna Nuclear Power Plant                    54                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
1          2          3                  4                5 Residents                                                                                Households wait 1
for Commuters Households without Residents 1          2          5                                          Commuters and households who do not wait for Commuters (a) Accident occurs during midweek, at midday; year round Residents, Transients 1          2          4            5 Return to residence, away from                                                                                then evacuate Residence Residents,            1          2          5                                          Residents at home; Transients at                                                                            transients evacuate directly Residence (b) Accident occurs during weekend or during the evening2 1          2          3, 5 (c) Employees who live outside the EPZ ACTIVITIES                                              EVENTS 1      2 Receive Notification                              1. Notification 2    3 Prepare to Leave Work                              2. Aware of situation 2, 3      4 Travel Home                                        3. Depart work 2, 4      5 Prepare to Leave to Evacuate                      4. Arrive home
: 5. Depart on evacuation trip Activities Consume Time 1
Applies for evening and weekends also if commuters are at work.
2 Applies throughout the year for transients.
Figure 51. Events and Activities Preceding the Evacuation Trip R.E. Ginna Nuclear Power Plant                          55                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                      Rev. 1
 
5.3    Estimated Time Distributions of Activities Preceding Event 5 The time distribution of an event is obtained by "summing" the time distributions of all prior contributing activities. (This "summing" process is quite different than an algebraic sum since it is performed on distributions - not scalar numbers).
Time Distribution No. 1, Notification Process: Activity 1  2 It is assumed (based on the presence of sirens within the EPZ) that 87 percent of those within the EPZ will be aware of the accident within 30 minutes with the remainder notified within the following 15 minutes. The notification distribution is given below:
Table 52. Time Distribution for Notifying the Public Elapsed Time                Percent of (Minutes)            Population Notified 0                        0%
5                        7%
10                        13%
15                        27%
20                        47%
25                        66%
30                        87%
35                        92%
40                        97%
45                        100%
R.E. Ginna Nuclear Power Plant                        56                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
Distribution No. 2, Prepare to Leave Work: Activity 2  3 It is reasonable to expect that the vast majority of business enterprises within the EPZ will elect to shut down following notification and most employees would leave work quickly. Commuters, who work outside the EPZ could, in all probability, also leave quickly since facilities outside the EPZ would remain open and other personnel would remain. Personnel or farmers responsible for equipment/livestock would require additional time to secure their facility. The distribution of Activity 2  3 shown in Table 53 reflects data obtained by the telephone survey. This distribution is plotted in Figure 52.
Table 53. Time Distribution for Employees to Prepare to Leave Work Cumulative                                  Cumulative Percent                                    Percent Elapsed Time            Employees          Elapsed Time            Employees (Minutes)            Leaving Work            (Minutes)          Leaving Work 0                    0%                    35                    91%
5                    50%                  40                    91%
10                    70%                  45                    94%
15                    78%                  50                    94%
20                    82%                  55                    94%
25                    83%                  60                  100%
30                    91%
NOTE: The survey data was normalized to distribute the "Don't know" response. That is, the sample was reduced in size to include only those households who responded to this question. The underlying assumption is that the distribution of this activity for the Dont know responders, if the event takes place, would be the same as those responders who provided estimates.
R.E. Ginna Nuclear Power Plant                            57                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                    Rev. 1
 
Distribution No. 3, Travel Home: Activity 3  4 These data are provided directly by those households which responded to the telephone survey. This distribution is plotted in Figure 52 and listed in Table 54.
Table 54. Time Distribution for Commuters to Travel Home Cumulative                                Cumulative Elapsed Time            Percent            Elapsed Time          Percent (Minutes)        Returning Home            (Minutes)      Returning Home 0                  0%                    35                90%
5                  9%                    40                94%
10                  22%                    45                99%
15                  36%                    50                99%
20                  59%                    55                99%
25                  66%                    60                100%
30                  87%
NOTE: The survey data was normalized to distribute the "Don't know" response R.E. Ginna Nuclear Power Plant                        58                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
Distribution No. 4, Prepare to Leave Home:          Activity 2, 4  5 These data are provided directly by those households which responded to the telephone survey. This distribution is plotted in Figure 52 and listed in Table 55.
Table 55. Time Distribution for Population to Prepare to Evacuate Cumulative Elapsed Time        Percent Ready to (Minutes)              Evacuate 0                    0%
15                    14%
30                    63%
45                    72%
60                    87%
75                    94%
90                    95%
105                    95%
120                    98%
135                  100%
NOTE: The survey data was normalized to distribute the "Don't know" response R.E. Ginna Nuclear Power Plant                          59                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                Rev. 1
 
Distribution No. 5, Snow Clearance Time Distribution Inclement weather scenarios involving snowfall must address the time lags associated with snow clearance. It is assumed that snow equipment is mobilized and deployed during the snowfall to maintain passable roads. The general consensus is that the snowplowing efforts are generally successful for all but the most extreme blizzards when the rate of snow accumulation exceeds that of snow clearance over a period of many hours.
Consequently, it is reasonable to assume that the highway system will remain passable - albeit at a lower capacity - under the vast majority of snow conditions. Nevertheless, for the vehicles to gain access to the highway system, it may be necessary for driveways and employee parking lots to be cleared to the extent needed to permit vehicles to gain access to the roadways.
These clearance activities take time; this time must be incorporated into the trip generation time distributions. These data are provided by those households which responded to the telephone survey. This distribution is plotted in Figure 52 and listed in Table 56.
Note that those respondents (56%) who answered that they would not take time to clear their driveway were assumed to be ready immediately at the start of this activity. Essentially they would drive through the snow on the driveway to access the roadway and begin their evacuation trip.
Table 56. Time Distribution for Population to Clear 6"8" of Snow Cumulative Percent Elapsed Time            Completing (Minutes)            Snow Removal 0                    56%
15                    66%
30                    88%
45                    92%
60                    96%
75                    98%
90                    98%
105                    98%
120                    99%
135                  100%
NOTE: The survey data was normalized to distribute the "Don't know" response R.E. Ginna Nuclear Power Plant                          510                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                Rev. 1
 
Mobilization Activities 100%
80%
60%
Notification Prepare to Leave Work Travel Home 40%                                                                                  Prepare Home Time to Clear Snow 20%
Percent of Population Completing Mobilization Activity 0%
0  30                60                    90                  120  150 Elapsed Time from Start of Mobilization Activity (min)
Figure 52. Evacuation Mobilization Activities R.E. Ginna Nuclear Power Plant                                                                                  511                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                                            Rev. 1
 
5.4    Calculation of Trip Generation Time Distribution The time distributions for each of the mobilization activities presented herein must be combined to form the appropriate Trip Generation Distributions. As discussed above, this study assumes that the stated events take place in sequence such that all preceding events must be completed before the current event can occur. For example, if a household awaits the return of a commuter, the worktohome trip (Activity 3  4) must precede Activity 4  5.
To calculate the time distribution of an event that is dependent on two sequential activities, it is necessary to sum the distributions associated with these prior activities. The distribution summing algorithm is applied repeatedly as shown to form the required distribution. As an outcome of this procedure, new time distributions are formed; we assign letter designations to these intermediate distributions to describe the procedure. Table 57 presents the summing procedure to arrive at each designated distribution.
Table 57. Mapping Distributions to Events Apply Summing Algorithm To:                  Distribution Obtained      Event Defined Distributions 1 and 2                        Distribution A            Event 3 Distributions A and 3                        Distribution B            Event 4 Distributions B and 4                        Distribution C            Event 5 Distributions 1 and 4                        Distribution D            Event 5 Distributions C and 5                        Distribution E            Event 5 Distributions D and 5                        Distribution F          Event 5 Table 58 presents a description of each of the final trip generation distributions achieved after the summing process is completed.
R.E. Ginna Nuclear Power Plant                      512                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
Table 58. Description of the Distributions Distribution      Description Time distribution of commuters departing place of work (Event 3). Also applies A          to employees who work within the EPZ who live outside, and to Transients within the EPZ.
B          Time distribution of commuters arriving home (Event 4).
Time distribution of residents with commuters who return home, leaving home C
to begin the evacuation trip (Event 5).
Time distribution of residents without commuters returning home, leaving home D
to begin the evacuation trip (Event 5).
Time distribution of residents with commuters who return home, leaving home E
to begin the evacuation trip, after snow clearance activities (Event 5).
Time distribution of residents with no commuters returning home, leaving to F
begin the evacuation trip, after snow clearance activities (Event 5).
5.4.1 Statistical Outliers As already mentioned, some portion of the survey respondents answer dont know to some questions or choose to not respond to a question. The mobilization activity distributions are based upon actual responses. But, it is the nature of surveys that a few numeric responses are inconsistent with the overall pattern of results. An example would be a case in which for 500 responses, almost all of them estimate less than two hours for a given answer, but 3 say four hours and 4 say six or more hours.
These outliers must be considered: are they valid responses, or so atypical that they should be dropped from the sample?
In assessing outliers, there are three alternates to consider:
: 1) Some responses with very long times may be valid, but reflect the reality that the respondent really needs to be classified in a different population subgroup, based upon special needs;
: 2) Other responses may be unrealistic (6 hours to return home from commuting distance, or 2 days to prepare the home for departure);
: 3) Some high values are representative and plausible, and one must not cut them as part of the consideration of outliers.
The issue of course is how to make the decision that a given response or set of responses are to be considered outliers for the component mobilization activities, using a method that objectively quantifies the process.
There is considerable statistical literature on the identification and treatment of outliers singly or in groups, much of which assumes the data is normally distributed and some of which uses non R.E. Ginna Nuclear Power Plant                      513                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
parametric methods to avoid that assumption. The literature cites that limited work has been done directly on outliers in sample survey responses.
In establishing the overall mobilization time/trip generation distributions, the following principles are used:
: 1) It is recognized that the overall trip generation distributions are conservative estimates, because they assume a household will do the mobilization activities sequentially, with no overlap of activities;
: 2) The individual mobilization activities (prepare to leave work, travel home, prepare home, clear snow) are reviewed for outliers, and then the overall trip generation distributions are created (see Figure 51, Table 57, Table 58);
: 3) Outliers can be eliminated either because the response reflects a special population (e.g.
special needs, transit dependent) or lack of realism, because the purpose is to estimate trip generation patterns for personal vehicles;
: 4) To eliminate outliers, a) the mean and standard deviation of the specific activity are estimated from the responses, b) the median of the same data is estimated, with its position relative to the mean noted, c) the histogram of the data is inspected, and d) all values greater than 3.5 standard deviations are flagged for attention, taking special note of whether there are gaps (categories with zero entries) in the histogram display.
In general, only flagged values more than 4 standard deviations from the mean are allowed to be considered outliers, with gaps in the histogram expected.
When flagged values are classified as outliers and dropped, steps a to d are repeated.
R.E. Ginna Nuclear Power Plant                    514                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
: 5) As a practical matter, even with outliers eliminated by the above, the resultant histogram, viewed as a cumulative distribution, is not a normal distribution. A typical situation that results is shown below in Figure 53.
100.0%
90.0%
80.0%
Cumulative Percentage (%)
70.0%
60.0%
50.0%
40.0%
30.0%
20.0%
10.0%
0.0%
112.5 2.5  7.5  12.5  17.5  22.5  27.5  32.5  37.5  42.5  47.5  52.5  57.5  67.5  82.5  97.5 Center of Interval (minutes)
Cumulative Data                                Cumulative Normal Figure 53. Comparison of Data Distribution and Normal Distribution
: 6) In particular, the cumulative distribution differs from the normal distribution in two key aspects, both very important in loading a network to estimate evacuation times:
Most of the real data is to the left of the normal curve above, indicating that the network loads faster for the first 8085% of the vehicles, potentially causing more (and earlier) congestion than otherwise modeled; The last 1015% of the real data tails off slower than the comparable normal curve, indicating that there is significant traffic still loading at later times.
Because these two features are important to preserve, it is the histogram of the data that is used to describe the mobilization activities, not a normal curve fit to the data. One could consider other distributions, but using the shape of the actual data curve is unambiguous and preserves these important features;
: 7) With the mobilization activities each modeled according to Steps 16, including preserving the features cited in Step 6, the overall (or total) mobilization times are constructed.
This is done by using the data sets and distributions under different scenarios (e.g. commuter returning, no commuter returning, no snow or snow in each). In general, these are additive, using R.E. Ginna Nuclear Power Plant                                                            515                                                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                                                  Rev. 1
 
weighting based upon the probability distributions of each element; Figure 54 presents the combined trip generation distributions designated A, C, D, E and F. These distributions are presented on the same time scale. (As discussed earlier, the use of strictly additive activities is a conservative approach, because it makes all activities sequential - preparation for departure follows the return of the commuter; snow clearance follows the preparation for departure, and so forth. In practice, it is reasonable that some of these activities are done in parallel, at least to some extent - for instance, preparation to depart begins by a household member at home while the commuter is still on the road.)
The mobilization distributions that result are used in their tabular/graphical form as direct inputs to later computations that lead to the ETE.
The DYNEV II simulation model is designed to accept varying rates of vehicle trip generation for each origin centroid, expressed in the form of histograms. These histograms, which represent Distributions A, C, D, E and F, properly displaced with respect to one another, are tabulated in Table 59 (Distribution B, Arrive Home, omitted for clarity).
The final time period (15) is 600 minutes long. This time period is added to allow the analysis network to clear, in the event congestion persists beyond the trip generation period. Note that there are no trips generated during this final time period.
R.E. Ginna Nuclear Power Plant                    516                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
5.4.2 Staged Evacuation Trip Generation As defined in NUREG/CR7002, staged evacuation consists of the following:
: 1. ERPAs comprising the 2 mile region are advised to evacuate immediately
: 2. ERPAs comprising regions extending from 2 to 5 miles downwind are advised to shelter inplace while the 2 mile region is cleared
: 3. As vehicles evacuate the 2 mile region, sheltered people from 2 to 5 miles downwind continue preparation for evacuation
: 4. The population sheltering in the 2 to 5 mile region are advised to begin evacuating when approximately 90% of those originally within the 2 mile region evacuate across the 2 mile region boundary
: 5. Noncompliance with the shelter recommendation is the same as the shadow evacuation percentage of 20%
Assumptions
: 1. The population in the shadow region beyond the EPZ boundary, extending to approximately 15 miles radially from the plant, will react as they do for all nonstaged evacuation scenarios. That is 20% of these households will elect to evacuate with no shelter delay.
: 2. 20% of the EPZ population in ERPA beyond 5 miles will elect to evacuate with no shelter delay.
: 3. The transient population will not be expected to stage their evacuation because of the limited sheltering options available to people who may be at parks, on a beach, or at other venues. Also, notifying the transient population of a staged evacuation would prove difficult.
: 4. Employees will also be assumed to evacuate without first sheltering.
Procedure
: 1. Trip generation for population groups in the 2 mile region will be as computed based upon the results of the telephone survey and analysis.
: 2. Trip generation for the population subject to staged evacuation will be formulated as follows:
: a. Identify the 90th percentile evacuation time for the ERPAs comprising the two mile region. This value, TScen*, is obtained from simulation results. It will become the time at which the region being sheltered will be told to evacuate for each scenario.
: b. The resultant trip generation curves for staging are then formed as follows:
: i. The nonshelter trip generation curve is followed until a maximum of 20%
of the total trips are generated (to account for shelter noncompliance).
ii. No additional trips are generated until time TScen*
R.E. Ginna Nuclear Power Plant                      517                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
iii. Following time TScen*, the balance of trips are generated:
: 1. by stepping up and then following the nonshelter trip generation curve (if TScen* is < max trip generation time) or
: 2. by stepping up to 100% (if TScen* is > max trip generation time)
: c. Note: This procedure implies that there may be different staged trip generation distributions for different scenarios. NUREG/CR7002 uses the statement approximately 90th percentile as the time to end staging and begin evacuating.
The value of TScen* is 1:45 for nonsnow scenarios and 2:15 for snow scenarios.
: 3. Staged trip generation distributions are created for the following population groups:
: a. Residents with returning commuters
: b. Residents without returning commuters
: c. Residents with returning commuters and snow conditions
: d. Residents without returning commuters and snow conditions Figure 55 presents the staged trip generation distributions for both residents with and without returning commuters; the 90th percentile twomile evacuation time is 105 minutes for good weather and 135 minutes for snow scenarios. At the 90th percentile evacuation time, approximately 20% of the population (who have completed their mobilization activities) advised to shelter has nevertheless departed the area. These people do not comply with the shelter advisory. Also included on the plot are the trip generation distributions for these groups as applied to the regions advised to evacuate immediately.
Since the 90th percentile evacuation time occurs before the end of the trip generation time, after the sheltered region is advised to evacuate, the shelter trip generation distribution rises to meet the balance of the nonstaged trip generation distribution. Following time TScen*, the balance of staged evacuation trips that are ready to depart are released within 15 minutes. After TScen*+15, the remainder of evacuation trips are generated in accordance with the unstaged trip generation distribution.
Table 510 provides the trip generation histograms for staged evacuation.
5.4.3 Trip Generation for Waterways and Recreational Areas In the Monroe County Radiological Emergency Preparedness Plan, Procedure J item II B 1 states that:
Coast Guard Station Rochester to initiate PRE COMMS instructing local marinas that all vessels stay 10 Statute miles clear of Ginna Station until further notice; (NOTE: The National Weather Service, NWS, radio (162.40 MHz) and/or the Emergency Alert System, may also be used to inform boaters).
There is no time estimate given for these activities. It is assumed boaters will return to marinas within the mobilization time of transients within the EPZ.
R.E. Ginna Nuclear Power Plant                          518                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                    Rev. 1
 
Table 59. Trip Generation Histograms for the EPZ Population for Unstaged Evacuation Percent of Total Trips Generated Within Indicated Time Period Residents        Residents With          Residents Residents with          Without            Commuters              Without Time      Duration        Employees              Transients          Commuters            Commuters              Snow          Commuters Snow Period        (Min)        (Distribution A)      (Distribution A)    (Distribution C)      (Distribution D)    (Distribution E)      (Distribution F) 1          15                8%                    8%                  0%                    1%                  0%                    1%
2          15                37%                    37%                  0%                    9%                  0%                    5%
3          15                34%                    34%                  3%                  26%                  2%                  17%
4          15                11%                    11%                10%                  28%                  6%                  22%
5          15                5%                    5%                  19%                  15%                13%                  17%
6          15                4%                    4%                  20%                  10%                17%                  14%
7          15                1%                    1%                  17%                    5%                16%                    9%
8          15                0%                    0%                  12%                    1%                14%                    5%
9          15                0%                    0%                  8%                    2%                11%                    3%
10          15                0%                    0%                  4%                    2%                  7%                    2%
11          15                0%                    0%                  3%                    1%                  4%                    2%
12          30                0%                    0%                  3%                    0%                  6%                    2%
13          30                0%                    0%                  1%                    0%                  3%                    1%
14          30                0%                    0%                  0%                    0%                  1%                    0%
15          600                0%                    0%                  0%                    0%                  0%                    0%
NOTE:
Shadow vehicles are loaded onto the analysis network (Figure 12) using Distributions C and E for good weather and snow, respectively.
Special event vehicles are loaded using Distribution A.
R.E. Ginna Nuclear Power Plant                                            519                                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                            Rev. 1
 
Trip Generation Distributions Employees/Transients            Residents with Commuters          Residents with no Commuters Res with Comm and Snow          Res no Comm with Snow 100 80 60 40 20 Percent of Population Beginning Evacuation Trip 0
0  30              60            90          120            150            180          210            240          270 Elapsed Time from Evacuation Advisory (min)
Figure 54. Comparison of Trip Generation Distributions R.E. Ginna Nuclear Power Plant                                                                                520                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                                                            Rev. 1
 
Table 510. Trip Generation Histograms for the EPZ Population for Staged Evacuation Percent of Total Trips Generated Within Indicated Time Period*
Residents                                      Residents Residents with          Without              Residents With            Without Time        Duration          Commuters            Commuters            Commuters Snow        Commuters Snow Period        (Min)        (Distribution C)      (Distribution D)        (Distribution E)      (Distribution F) 1            15                0%                    0%                      0%                    0%
2            15                0%                    2%                      0%                    1%
3            15                1%                    5%                      0%                    4%
4            15                2%                    6%                      2%                    4%
5            15                3%                    3%                      2%                    3%
6            15                4%                    2%                      4%                    3%
7            15                4%                    1%                      3%                    2%
8            15              67%                    76%                      3%                    1%
9            15                8%                    2%                      2%                    1%
10            15                4%                    2%                    70%                  76%
11            15                3%                    1%                      4%                    2%
12            30                3%                    0%                      6%                    2%
13            30                1%                    0%                      3%                    1%
14            30                0%                    0%                      1%                    0%
15            600                0%                    0%                      0%                    0%
                    *Trip Generation for Employees and Transients (see Table 59) is the same for Unstaged and Staged Evacuation.
R.E. Ginna Nuclear Power Plant                                              521                                                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                              Rev. 1
 
Staged and Unstaged Evacuation Trip Generation Employees / Transients                                        Residents with Commuters Residents with no Commuters                                  Res with Comm and Snow Res no Comm with Snow                                        Staged Residents with Commuters Staged Residents with no Commuters                            Staged Residents with Commuters (Snow)
Staged Residents with no Commuters (Snow) 100 80 60
% of Population Evacuating  40 20 0
0  15  30      45      60    75      90    105    120    135    150    165    180    195    210    225    240    255    270 Elapsed Time from Evacuation Advisory (min)
Figure 55. Comparison of Staged and Unstaged Trip Generation Distributions in the 2 to 5 Mile Region R.E. Ginna Nuclear Power Plant                                                                    522                                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                                                  Rev. 1
 
6    DEMAND ESTIMATION FOR EVACUATION SCENARIOS An evacuation case defines a combination of Evacuation Region and Evacuation Scenario.
The definitions of Region and Scenario are as follows:
Region            A grouping of contiguous evacuating ERPAs that forms either a keyhole sectorbased area, or a circular area within the EPZ, that must be evacuated in response to a radiological emergency.
Scenario          A combination of circumstances, including time of day, day of week, season, and weather conditions. Scenarios define the number of people in each of the affected population groups and their respective mobilization time distributions.
A total of 25 Regions were defined which encompass all the groupings of ERPAs considered.
These Regions are defined in Table 61. The ERPA configurations are identified in Figure 61.
Each keyhole sectorbased area consists of a central circle centered at the power plant, and three adjoining sectors, each with a central angle of 22.5 degrees, as per NUREG/CR7002 guidance. The central sector coincides with the wind direction. These sectors extend to 5 miles from the plant (Regions R04 through R08) or to the EPZ boundary (Regions R09 through R19).
Regions R01, R02 and R03 represent evacuations of circular areas with radii of 2, 5 and 10 miles, respectively. Regions R20 through R25 are identical to Regions R02 and R04 through R08, respectively; however, those ERPAs between 2 miles and 5 miles are staged until 90% of the 2 mile region (Region R01) has evacuated.
A total of 14 Scenarios were evaluated for all Regions. Thus, there are a total of 25 x 14 = 350 evacuation cases. Table 62 is a description of all Scenarios.
Each combination of region and scenario implies a specific population to be evacuated. Table 63 presents the percentage of each population group estimated to evacuate for each scenario.
Table 64 presents the vehicle counts for each scenario for an evacuation of Region R03 - the entire EPZ.
The vehicle estimates presented in Section 3 are peak values. These peak values are adjusted depending on the scenario and region being considered, using scenario and region specific percentages; the scenario percentages are presented in Table 63, while the regional percentages are provided in Table H1. The percentages presented in Table 63 were determined as follows:
The number of residents with commuters during the week (when workforce is at its peak) is equal to the product of 65% (the number of households with at least one commuter) and 34%
(the number of households with a commuter that would await the return of the commuter prior to evacuating). See assumption 3 in Section 2.3. It is estimated for weekend and evening scenarios that 10% of households with commuters will have a commuter at work during those times.
Employment is assumed to be at its peak during the winter, midweek, midday scenarios.
R.E. Ginna Nuclear Power Plant                    61                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
Employment is reduced slightly (96%) for summer, midweek, midday scenarios. This is based on the estimation that 50% of the employees commuting into the EPZ will be on vacation for a week during the approximate 12 weeks of summer. It is further estimated that those taking vacation will be uniformly dispersed throughout the summer with approximately 4% of employees vacationing each week. It is further estimated that only 10% of the employees are working in the evenings and during the weekends.
Transient activity is estimated to be at its peak during summer weekends and less (50%) during the week. As shown in Appendix E, there are six lodging facilities offering overnight accommodations in the EPZ; thus, transient activity still exists in the evening hours - 30% for summer and 20% for winter. Transient activity on winter weekends is estimated to be 40%.
As noted in the shadow footnote to Table 63, the shadow percentages are computed using a base of 20% (see assumption 5 in Section 2.2); to include the employees within the shadow region who may choose to evacuate, the voluntary evacuation is multiplied by a scenario specific proportion of employees to permanent residents in the shadow region. For example, using the values provided in Table 64 for Scenario 1, the shadow percentage is computed as follows:
7,488 20%    1                        25%
7,424 25,829 One special event - the Webster Fathers Day Soccer Tournament - was considered as Scenario
: 13. Thus, the special event traffic is 100% evacuated for Scenario 13, and 0% for all other scenarios.
It is estimated that summer school enrollment is approximately 10% of enrollment during the regular school year for summer, midweek, midday scenarios. School is not in session during weekends and evenings, thus no buses for school children are needed under those circumstances. As discussed in Section 7, schools are in session during the winter season, midweek, midday and 100% of buses will be needed under those circumstances. Transit buses for the transitdependent population are set to 100% for all scenarios as it is assumed that the transitdependent population is present in the EPZ for all scenarios.
External traffic is estimated to be reduced by 60% during evening scenarios and is 100% for all other scenarios.
R.E. Ginna Nuclear Power Plant                  62                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Table 61. Description of Evacuation Regions Basic Regions ERPA Region      Description      Degrees      W1  W2    W3  W4  W5  W6    W7    M1  M2    M3    M4  M5    M6  M7  M8 M9 R01        2Mile Region                    x R02        5Mile Region                    x    x      x                              x R03          Full EPZ                      x    x      x    x    x      x    x      x      x    x      x      x    x    x    x  x Evacuate 2Mile Region and Downwind to 5 Miles ERPA Region  Wind Direction From:  Degrees      W1  W2    W3  W4  W5  W6    W7    M1  M2    M3    M4  M5    M6  M7  M8 M9 R04              N            349  11    x    x R05        NNE, NE, ENE        12  78    x    x                                      x R06            E, ESE        79  124      x                                            x SE, SSE, S, SSW, SW  125  236                                              See Region R01 R07          WSW, W          237  281    x            x R08      WNW, NW, NNW        282  348    x    x      x Evacuate 5Mile Region and Downwind to the EPZ Boundary ERPA Region  Wind Direction From:  Degrees      W1  W2    W3  W4  W5  W6    W7    M1  M2    M3    M4  M5    M6  M7  M8 M9 R09              N            349  11    x    x      x          x      x    x      x      x                  x R10            NNE            12  33      x    x      x                        x      x      x    x      x      x          x R11              NE            34  56      x    x      x                        x      x      x    x      x      x    x    x    x  x R12            ENE            57  78      x    x      x                              x      x    x      x      x    x    x    x  x R13              E            79  101    x    x      x                              x            x      x            x    x    x  x R14              ESE          102  124    x    x      x                              x                                x          x SE, SSE, S, SSW, SW  125  236                                              See Region R02 R15            WSW            237  258    x    x      x    x                        x R16              W          259  281    x    x      x    x    x                  x R17            WNW            282  303    x    x      x    x    x      x            x R18            NW            304  326    x    x      x    x    x      x    x      x R19            NNW            327  348    x    x      x          x      x    x      x Staged Evacuation  2Mile Region Evacuates, then Evacuate Downwind to 5 Miles ERPA Region  Wind Direction From:  Degrees      W1  W2    W3  W4  W5  W6    W7    M1  M2    M3    M4  M5    M6  M7  M8 M9 R20          No Wind                      x    x      x                              x R21              N            349  11    x    x R22        NNE, NE, ENE        12  78    x    x                                      x R23            E, ESE        79  124      x                                            x SE, SSE, S, SSW, SW  125  236                                              See Region R01 R24          WSW, W          237  281    x            x R25      WNW, NW, NNW        282  348    x    x      x Key ERPA Evacuate              ERPA ShelterinPlace                    ShelterinPlace until 90% ETE for R01, then Evacuate R.E. Ginna Nuclear Power Plant                            63                                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Figure 61. Ginna EPZ ERPAs R.E. Ginna Nuclear Power Plant              64            KLD Engineering, P.C.
Evacuation Time Estimate                                                Rev. 1
 
Table 62. Evacuation Scenario Definitions Day of          Time of Scenario        Season1          Week              Day          Weather            Special 1            Summer          Midweek          Midday          Good              None 2            Summer          Midweek          Midday          Rain              None 3            Summer          Weekend          Midday          Good              None 4            Summer          Weekend          Midday          Rain              None Midweek, 5            Summer                            Evening          Good              None Weekend 6            Winter        Midweek          Midday          Good              None 7            Winter        Midweek          Midday          Rain              None 8            Winter        Midweek          Midday          Snow              None 9            Winter        Weekend          Midday          Good              None 10            Winter        Weekend          Midday          Rain              None 11            Winter        Weekend          Midday          Snow              None Midweek, 12            Winter                          Evening          Good              None Weekend Webster Fathers Day 13          Summer          Weekend          Midday          Good Soccer Tournament Roadway Impact - Lane 14          Summer          Midweek          Midday          Good Closure on SR 104 WB 1
Winter means that school is in session (also applies to spring and autumn). Summer means that school is not in session.
R.E. Ginna Nuclear Power Plant                          65                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                  Rev. 1
 
Table 63. Percent of Population Groups Evacuating for Various Scenarios Households                            Households With                            Without                                                                                                                          External Returning                            Returning                                                                      Special          School            Transit          Through Scenario                  Commuters                            Commuters              Employees        Transients        Shadow            Events          Buses              Buses            Traffic 1                            22%                                78%                  96%                50%              25%              0%              10%              100%              100%
2                            22%                                78%                  96%                50%              25%              0%              10%              100%              100%
3                            2%                                98%                  10%              100%              20%              0%              0%              100%              100%
4                            2%                                98%                  10%              100%              20%              0%              0%              100%              100%
5                            2%                                98%                  10%                30%              20%              0%              0%              100%              40%
6                            22%                                78%                  100%                40%              25%              0%              100%              100%              100%
7                            22%                                78%                  100%                40%              25%              0%              100%              100%              100%
8                            22%                                78%                  100%                40%              25%              0%              100%              100%              100%
9                            2%                                98%                  10%                40%              20%              0%              0%              100%              100%
10                            2%                                98%                  10%                40%              20%              0%              0%              100%              100%
11                            2%                                98%                  10%                40%              20%              0%              0%              100%              100%
12                            2%                                98%                  10%                20%              20%              0%              0%              100%              40%
13                            2%                                98%                  10%              100%              20%              100%              0%              100%              100%
14                            22%                                78%                  96%                50%              25%              0%              10%              100%              100%
Resident Households with Commuters .......Households of EPZ residents who await the return of commuters prior to beginning the evacuation trip.
Resident Households with No Commuters ..Households of EPZ residents who do not have commuters or will not await the return of commuters prior to beginning the evacuation trip.
Employees..................................................EPZ employees who live outside the EPZ Transients ..................................................People who are in the EPZ at the time of an accident for recreational or other (nonemployment) purposes.
Shadow ......................................................Residents and employees in the shadow region (outside of the EPZ) who will spontaneously decide to relocate during the evacuation. The basis for the values shown is a 20% relocation of shadow residents along with a proportional percentage of shadow employees.
Special Events ............................................Additional vehicles in the EPZ due to the identified special event.
School and Transit Buses ............................Vehicleequivalents present on the road during evacuation servicing schools and transitdependent people (1 bus is equivalent to 2 passenger vehicles).
External Through Traffic .............................Traffic on interstates/freeways and major arterial roads at the start of the evacuation. This traffic is stopped by access control approximately 2 hours after the evacuation begins.
R.E. Ginna Nuclear Power Plant                                                                                  66                                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                                                                                  Rev. 1
 
Table 64. Vehicle Estimates by Scenario Households      Households With          Without                                                                                              Total Returning      Returning                                                Special  School Transit    External        Scenario Scenario      Commuters      Commuters      Employees      Transients      Shadow    Events  Buses  Buses  Through Traffic    Vehicles 1            7,424          25,829          7,488            443        19,524              57    138      17,134          78,037 2            7,424          25,829          7,488            443        19,524              57    138      17,134          78,037 3            742          32,511            780            886        16,309                    138      17,134          68,500 4            742          32,511            780            886        16,309                    138      17,134          68,500 5            742          32,511            780            266        16,309                    138        6,854          57,600 6            7,424          25,829          7,800            354        19,673              568    138      17,134          78,920 7            7,424          25,829          7,800            354        19,673              568    138      17,134          78,920 8            7,424          25,829          7,800            354        19,673              568    138      17,134          78,920 9            742          32,511            780            354        16,309                    138      17,134          67,968 10            742          32,511            780            354        16,309                    138      17,134          67,968 11            742          32,511            780            354        16,309                    138      17,134          67,968 12            742          32,511            780            177        16,309                    138        6,854          57,511 13            742          32,511            780            886        16,309      977            138      17,134          69,477 14            7,424          25,829          7,488            443        19,524              57    138      17,134          78,037 Note: Vehicle estimates are for an evacuation of the entire EPZ (Region R03)
R.E. Ginna Nuclear Power Plant                                                67                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                    Rev. 1
 
7    GENERAL POPULATION EVACUATION TIME ESTIMATES (ETE)
This section presents the ETE results of the computer analyses using the DYNEV II System described in Appendices B, C and D. These results cover 25 regions within the Ginna Nuclear EPZ and the 14 Evacuation Scenarios discussed in Section 6.
The ETE for all Evacuation Cases are presented in Table 71 and Table 72. These tables present the estimated times to clear the indicated population percentages from the Evacuation Regions for all Evacuation Scenarios. The ETE of the 2mile region in both staged and unstaged regions are presented in Table 73 and Table 74. Table 75 defines the Evacuation Regions considered.
The tabulated values of ETE are obtained from the DYNEV II System outputs which are generated at 5minute intervals.
7.1    Voluntary Evacuation and Shadow Evacuation Voluntary evacuees are people within the EPZ in ERPAs for which an Advisory to Evacuate has not been issued, yet who elect to evacuate. Shadow evacuation is the voluntary outward movement of some people from the Shadow Region (outside the EPZ) for whom no protective action recommendation has been issued. Both voluntary and shadow evacuations are assumed to take place over the same time frame as the evacuation from within the impacted Evacuation Region.
The ETE for the Ginna EPZ addresses the issue of voluntary evacuees in the manner shown in Figure 71. Within the EPZ, 20 percent of people located in ERPAs outside of the evacuation region who are not advised to evacuate, are assumed to elect to evacuate. Similarly, it is assumed that 20 percent of those people in the Shadow Region will choose to leave the area.
Figure 72 presents the area identified as the Shadow Region. This region extends radially from the plant to cover a region between the EPZ boundary and approximately 15 miles. The population and number of evacuating vehicles in the Shadow Region were estimated using the same methodology that was used for permanent residents within the EPZ (see Section 3.1). As discussed in Section 3.2, it is estimated that a total of 153,317 people reside in the Shadow Region; 20 percent of them would evacuate. See Table 64 for the number of evacuating vehicles from the Shadow Region.
Traffic generated within this Shadow Region, traveling away from the plant location, has the potential for impeding evacuating vehicles from within the Evacuation Region. All ETE calculations include this shadow traffic movement.
7.2    Staged Evacuation As defined in NUREG/CR7002, staged evacuation consists of the following:
: 1. ERPAs comprising the 2 mile region are advised to evacuate immediately.
: 2. ERPAs comprising regions extending from 2 to 5 miles downwind are advised to shelter inplace while the two mile region is cleared.
R.E. Ginna Nuclear Power Plant                    71                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
: 3. As vehicles evacuate the 2 mile region, people from 2 to 5 miles downwind continue preparation for evacuation while they shelter.
: 4. The population sheltering in the 2 to 5 mile region is advised to evacuate when approximately 90% of the 2 mile region evacuating traffic crosses the 2 mile region boundary.
: 5. Noncompliance with the shelter recommendation is the same as the shadow evacuation percentage of 20%.
See Section 5.4.2 for additional information on staged evacuation.
7.3    Patterns of Traffic Congestion during Evacuation Figure 73 through Figure 77 illustrate the patterns of traffic congestion that arise for the case when the entire EPZ (Region R03) is advised to evacuate during the summer, midweek, midday period under good weather conditions (Scenario 1).
Traffic congestion, as the term is used here, is defined as Level of Service (LOS) F. LOS F is defined as follows (HCM 2010, page 55):
The HCM uses LOS F to define operations that have either broken down (i.e., demand exceeds capacity) or have exceeded a specified service measure value, or combination of service measure values, that most users would consider unsatisfactory. However, particularly for planning applications where different alternatives may be compared, analysts may be interested in knowing just how bad the LOS F condition is. Several measures are available to describe individually, or in combination, the severity of a LOS F condition:
* Demandtocapacity ratios describe the extent to which capacity is exceeded during the analysis period (e.g., by 1%, 15%, etc.);
* Duration of LOS F describes how long the condition persists (e.g., 15 min, 1 h, 3 h); and
* Spatial extent measures describe the areas affected by LOS F conditions. These include measures such as the back of queue, and the identification of the specific intersection approaches or system elements experiencing LOS F conditions.
All highway "links" which experience LOS F are delineated in these figures by a thick red line; all others are lightly indicated. Congestion develops rapidly around concentrations of population and traffic bottlenecks. Figure 73 displays the developing congestion within the population centers of Webster to the southwest of Ginna, and Ontario to the south, just 30 minutes after the Advisory to Evacuate (ATE). Note that State Route 104 (SR 104), which is servicing the externalexternal trips is displaying heavy traffic demand (LOS D and E) on those sections exiting the EPZ to the west. There is never any congestion within 2 miles of the plant due to sufficient roadway capacity and pathways to exit the area.
At one hour after the ATE, Figure 74 displays fullydeveloped congestion within these R.E. Ginna Nuclear Power Plant                    72                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
population centers and along the exiting sections along SR 104. The most severely impacted area is in northwest Webster at the Xerox Headquarters. The congestion on the southwest is now involving shadow evacuees from the Shadow Region in western Penfield, Fairport and East Rochester. The confluence of the congestion in the Penfield is clearly impacting the rate of travel out of the southwestern boundary of the EPZ. Congestion also exists on SR 350 extending from the Town of Ontario to the EPZ boundary directly south of the plant.
At 2 hours after the ATE, as shown in Figure 75, congestion still persists but has migrated away from the plant. There is heavy traffic flow but no congestion within the 5mile region and Wayne County, and the majority of congestion in the southwest is outside the EPZ. Congestion still persists in Webster as vehicles wait to access SR 104 westbound, or decide to take alternate routes to the south or west.
At 2 hours and 30 minutes after the ATE, as shown in Figure 76, the only congestion remaining in the EPZ due to vehicles evacuating from the Webster area on Shoecraft Road, State Road and Plank Road. Congestion in the shadow region continues as most vehicles wait to access I490 and I590.
At 3 hours and 10 minutes after the ATE, as shown in Figure 77, the EPZ has cleared of all congestions and there is only congestion remaining in East Rochester. The entire network clears of congestion at 3:25 after the ATE.
7.4    Evacuation Rates Evacuation is a continuous process, as implied by Figure 78 through Figure 721. These figures indicate the rate at which traffic flows out of the indicated areas for the case of an evacuation of the full EPZ (Region R03) under the indicated conditions. One figure is presented for each scenario considered.
As indicated in Figure 78, there is typically a long "tail" to these distributions. Vehicles begin to evacuate an area slowly at first, as people respond to the ATE at different rates. Then traffic demand builds rapidly (slopes of curves increase). When the system becomes congested, traffic exits the EPZ at rates somewhat below capacity until some evacuation routes have cleared. As more routes clear, the aggregate rate of egress slows since many vehicles have already left the EPZ. Towards the end of the process, relatively few evacuation routes service the remaining demand. The fact that the tail of the ETE curve extends considerably beyond the time at which congestion is cleared, is indicative of the mobilization time of residents with commuters, which can be as long as 3 hours and 45 minutes.
This decline in aggregate flow rate, towards the end of the process, is characterized by these curves flattening and gradually becoming horizontal. Ideally, it would be desirable to fully saturate all evacuation routes equally so that all will service traffic near capacity levels and all will clear at the same time. For this ideal situation, all curves would retain the same slope until the end - thus minimizing evacuation time. In reality, this ideal is generally unattainable reflecting the spatial variation in population density, mobilization rates and in highway capacity over the EPZ.
R.E. Ginna Nuclear Power Plant                    73                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
7.5    Evacuation Time Estimate (ETE) Results Table 71 through Table 72 present the ETE values for all 25 Evacuation Regions and all 14 Evacuation Scenarios. Table 73 through Table 74 present the ETE values for the 2Mile region for both staged and unstaged keyhole regions downwind to 5 miles. They are organized as follows:
Table                                    Contents ETE represents the elapsed time required for 90 percent of the 71      population within a Region, to evacuate from that Region. All Scenarios are considered, as well as Staged Evacuation scenarios.
ETE represents the elapsed time required for 100 percent of the 72      population within a Region, to evacuate from that Region. All Scenarios are considered, as well as Staged Evacuation scenarios.
ETE represents the elapsed time required for 90 percent of the 73      population within the 2mile Region, to evacuate from that Region with both Concurrent and Staged Evacuations.
ETE represents the elapsed time required for 100 percent of the 74      population within the 2mile Region, to evacuate from that Region with both Concurrent and Staged Evacuations.
The animation snapshots described above reflect the ETE statistics for the concurrent (un staged) evacuation scenarios and regions, which are displayed in Figure 73 through Figure 77.
Most of the congestion is located beyond the 5mile radius; some congestion exists between the 2 and 5 mile radii, and virtually none within the 2mile radius. This is reflected in the ETE statistics:
The 90th percentile ETE for Region R01 (2mile area) generally range between 1:35 (hr:min) and 1:50 (slightly higher for snow).
The 90th percentile ETE for Region R02 (5mile area) generally range between 1:45 (hr:min) and 2:00 (slightly higher for rain and snow).
The 90th percentile ETE for Regions R03 (full EPZ) and R09 - R19 (which extend to the EPZ boundary) generally range between 1:50 (hr:min) and 2:00 (slightly higher for rain and snow).
The 100th percentile ETE for all Regions and for all Scenarios are directly dependent on the mobilization times. This fact implies that the congestion within the EPZ dissipates prior to the end of mobilization, as is displayed in Figure 77.
Comparison of Scenarios 3 and 13 in Table 71 indicates that the Special Event - the Webster Fathers Day Soccer Tournament - has no impact on the ETE for the 90th percentile. The additional 977 vehicles present for the special event are fastmobilizing transients located less than 2miles from the EPZ boundary. Any increased congestion these vehicles cause early on is R.E. Ginna Nuclear Power Plant                      74                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                            Rev. 1
 
negated by how quickly they are able to mobilize and exit the EPZ.
Comparison of Scenarios 1 and 14 in Table 71 indicates that the roadway closure - SR 404 just south of the intersection of Plank Road - does not have an effect on ETE. There is sufficient roadway capacity for vehicles to find other routes, and the additional congestion created does not back up into the EPZ.
7.6    Staged Evacuation Results Table 73 and Table 74 present a comparison of the ETE compiled for the concurrent (un staged) and staged evacuation studies. Note that Regions R20 through R25 are the same geographic areas as Regions R02 and, R04 through R08, respectively.
To determine whether the staged evacuation strategy is worthy of consideration, one must show that the ETE for the 2 Mile region can be reduced without significantly affecting the region between 2 miles and 5 miles. In all cases, as shown in these tables, the ETE for the 2 mile region increases when a staged evacuation is implemented. The reason for this is that the congestion within the 5mile area does not extend upstream to the extent that it penetrates to within 2 miles of Ginna. Consequently, the impedance, due to this congestion within the 5mile area, to evacuees from within the 2mile area is not sufficient to materially influence the 90th percentile ETE for the 2mile area. Therefore, staging the evacuation to sharply reduce congestion within the 5mile area provides no benefits to evacuees from within the 2 mile region and unnecessarily delays the evacuation of those beyond 2 miles.
While failing to provide assistance to evacuees from within the 2mile region, staging produces a negative impact on the ETE for those evacuating from within the 5mile area. A comparison of ETE between graphically similar Regions retards the 90th percentile evacuation time for those in the 2 to 5mile area by up to 20 minutes (see Table 71). This extending of ETE is due to the delay in beginning the evacuation trip, experienced by those who shelter, plus the effect of the tripgeneration spike (significant volume of traffic beginning the evacuation trip at the same time) that follows their eventual ATE, in creating congestion within the EPZ area beyond 2 miles.
In summary, the staged evacuation option provides no benefits and adversely impacts many evacuees located beyond 2 miles away from the plant.
7.7    Guidance on Using ETE Tables The user first determines the percentile of population for which the ETE is sought (The NRC guidance calls for the 90th percentile). The applicable value of ETE within the chosen Table may then be identified using the following procedure:
: 1. Identify the applicable Scenario:
* Season Summer Winter (also Autumn and Spring)
* Day of Week R.E. Ginna Nuclear Power Plant                  75                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Midweek Weekend
* Time of Day Midday Evening
* Weather Condition Good Weather Rain Snow
* Special Event Webster Fathers Day Soccer Tournament Road Closure (A lane on SR 104 WB is closed)
* Evacuation Staging No, Staged Evacuation is not considered Yes, Staged Evacuation is considered While these Scenarios are designed, in aggregate, to represent conditions throughout the year, some further clarification is warranted:
* The conditions of a summer evening (either midweek or weekend) and rain are not explicitly identified in the Tables. For these conditions, Scenarios (2) and (4) apply.
* The conditions of a winter evening (either midweek or weekend) and rain are not explicitly identified in the Tables. For these conditions, Scenarios (7) and (10) for rain apply.
* The conditions of a winter evening (either midweek or weekend) and snow are not explicitly identified in the Tables. For these conditions, Scenarios (8) and (11) for snow apply.
* The seasons are defined as follows:
Summer assumes that public schools are not in session.
Winter (includes Spring and Autumn) considers that public schools are in session.
* Time of Day: Midday implies the time over which most commuters are at work or are travelling to/from work.
: 2. With the desired percentile ETE and Scenario identified, now identify the Evacuation Region:
* Determine the projected azimuth direction of the plume (coincident with the wind direction). This direction is expressed in terms of compass orientation: from N, NNE, NE,
* Determine the distance that the Evacuation Region will extend from the nuclear power plant. The applicable distances and their associated candidate Regions are given below:
2 Miles (Region R01)
To 5 Miles (Region R02, R04 through R08)
To EPZ Boundary (Regions R03, R09 through R19)
* Enter Table 75 and identify the applicable group of candidate Regions based on the R.E. Ginna Nuclear Power Plant                    76                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
distance that the selected Region extends from the Ginna Plant. Select the Evacuation Region identifier in that row, based on the azimuth direction of the plume, from the first column of the Table.
: 3. Determine the ETE Table based on the percentile selected. Then, for the Scenario identified in Step 1 and the Region identified in Step 2, proceed as follows:
* The columns of Table 71 are labeled with the Scenario numbers. Identify the proper column in the selected Table using the Scenario number defined in Step 1.
* Identify the row in this table that provides ETE values for the Region identified in Step 2.
* The unique data cell defined by the column and row so determined contains the desired value of ETE expressed in Hours:Minutes.
R.E. Ginna Nuclear Power Plant                    77                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
Example It is desired to identify the ETE for the following conditions:
* Sunday, August 10th at 4:00 AM.
* It is raining.
* Wind direction is from the northeast (NE).
* Wind speed is such that the distance to be evacuated is judged to be a 5mile radius and downwind to 10 miles (to EPZ boundary).
* The desired ETE is that value needed to evacuate 90 percent of the population from within the impacted Region.
* A staged evacuation is not desired.
Table 71 is applicable because the 90th percentile ETE is desired. Proceed as follows:
: 1. Identify the Scenario as summer, weekend, evening and raining. Entering Table 71, it is seen that there is no match for these descriptors. However, the clarification given above assigns this combination of circumstances to Scenario 4.
: 2. Enter Table 75 and locate the Region described as Evacuate 5Mile Radius and Downwind to the EPZ Boundary for wind direction from the NE (toward the SW) and read Region R11 in the first column of that row.
: 3. Enter Table 71 to locate the data cell containing the value of ETE for Scenario 4 and Region R11. This data cell is in column (4) and in the row for Region R11; it contains the ETE value of 2:00.
R.E. Ginna Nuclear Power Plant                    78                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Table 71. Time to Clear the Indicated Area of 90 Percent of the Affected Population Summer              Summer        Summer                  Winter                          Winter        Winter  Summer      Summer Midweek                                                              Midweek Midweek            Weekend                                Midweek                        Weekend                Weekend    Midweek Weekend                                                                Weekend Scenario:      (1)        (2)    (3)        (4)      (5)          (6)        (7)      (8)        (9)      (10)  (11)  (12)      (13)      (14)
Midday              Midday        Evening                Midday                          Midday      Evening  Midday      Midday Region      Good                Good                Good          Good                            Good                  Good      Special  Roadway Rain                Rain                              Rain      Snow                Rain Snow Weather              Weather            Weather      Weather                          Weather                Weather    Event      Impact Entire 2Mile Region, 5Mile Region, and EPZ R01        1:50        1:50    1:35        1:35    1:35          1:50      1:50      2:15      1:35    1:35  2:05    1:35      1:35        1:50 R02        2:00        2:00    1:55        1:55    1:45          2:00      2:05      2:20      1:55    1:55  2:10  1:45      1:55        1:50 R03        2:15        2:20    1:55        2:00    1:50          2:15      2:25      2:45      1:55    2:00  2:15    1:50      1:55        2:20 2Mile Region and Keyhole to 5 Miles R04        2:00        2:05    1:55        2:00    1:50          2:05      2:05      2:15      1:55    2:00  2:10  1:50      1:55        2:00 R05        2:00        2:00    1:55        2:00    1:45          2:00      2:00      2:15      1:55    2:00  2:10    1:45      1:55        2:00 R06        1:50        1:50    1:35        1:35    1:35          1:50      1:50      2:15      1:35    1:35  2:05  1:35      1:35        1:50 R07        2:00        1:55    1:45        1:45    1:40          2:00      1:55      2:15      1:45    1:45  2:10    1:40      1:45        1:55 R08        2:00        2:05    1:55        2:00    1:50          2:05      2:05      2:15      1:55    2:05  2:10  1:50      1:55        2:00 5Mile Region and Keyhole to EPZ Boundary R09        2:00        2:00    1:50        1:55    1:45          2:00      2:00      2:20      1:55    1:55  2:15    1:45      1:50        2:00 R10        2:00        2:00    1:55        1:55    1:50          2:00      2:05      2:25      1:50    1:55  2:10  1:50      1:50        1:55 R11        2:15        2:25    1:55        2:00    1:50          2:15      2:25      2:40      1:55    2:00  2:15    1:50      1:55        2:15 R12        2:15        2:25    1:55        2:00    1:50          2:15      2:25      2:40      1:55    2:00  2:15  1:50      1:55        2:15 R13        2:10        2:25    1:55        2:00    1:50          2:15      2:25      2:40      1:50    2:00  2:15    1:50      1:55        2:15 R14        2:00        2:00    1:50        1:55    1:45          1:55      2:00      2:15      1:50    1:55  2:10  1:45      1:50        2:00 R15        2:00        2:00    1:55        1:55    1:45          2:00      2:00      2:15      1:55    2:00  2:10    1:45      1:55        2:00 R16        2:05        2:05    1:55        1:55    1:45          2:05      2:05      2:15      1:55    1:55  2:15  1:45      1:55        2:05 R17        2:05        2:05    1:55        1:55    1:45          2:00      2:05      2:20      1:55    1:55  2:10    1:45      1:55        2:00 R18        2:05        2:05    1:55        2:00    1:45          2:00      2:05      2:20      1:55    2:00  2:15  1:45      1:55        2:05 R19        2:00        2:05    1:55        1:55    1:45          2:00      2:05      2:20      1:55    1:55  2:15    1:45      1:55        2:00 Staged Evacuation  2Mile Region and Keyhole to 5 Miles R20        2:10        2:15    2:10        2:15    2:10          2:10      2:15      2:45      2:10    2:15  2:45  2:10      2:05        2:10 R21        2:10        2:10    2:05        2:10    2:05          2:10      2:10      2:30      2:05    2:10  2:30    2:05      2:05        2:10 R22        2:10        2:15    2:10        2:10    2:10          2:10      2:10      2:35      2:10    2:15  2:40  2:10      2:10        2:10 R23        2:05        2:10    2:05        2:05    2:05          2:05      2:10      2:40      2:05    2:10  2:40    2:05      2:05        2:05 R24        2:10        2:05    2:05        2:05    2:00          2:10      2:05      2:30      2:05    2:05  2:30  2:00      2:05        2:05 R25        2:10        2:10    2:10        2:10    2:05          2:10      2:10      2:35      2:10    2:10  2:35    2:05      2:10        2:10 R.E. Ginna Nuclear Power Plant                                                79                                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                        Rev. 1
 
Table 72. Time to Clear the Indicated Area of 100 Percent of the Affected Population Summer              Summer          Summer                    Winter                          Winter          Winter    Summer    Summer Midweek                                                                  Midweek Midweek              Weekend                                  Midweek                          Weekend                    Weekend    Midweek Weekend                                                                  Weekend Scenario:    (1)        (2)      (3)          (4)      (5)          (6)        (7)        (8)        (9)    (10)      (11)  (12)        (13)      (14)
Midday                Midday          Evening                Midday                          Midday          Evening    Midday    Midday Region      Good                Good                  Good        Good                              Good                    Good      Special  Roadway Rain                  Rain                              Rain      Snow                Rain    Snow Weather            Weather                Weather Weather                                  Weather                  Weather      Event    Impact Entire 2Mile Region, 5Mile Region, and EPZ R01        3:45      3:45      3:45        3:45      3:45        3:45      3:45        4:15        3:45    3:45    4:15    3:45      3:45      3:45 R02        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R03        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 2Mile Region and Keyhole to 5 Miles R04        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R05        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R06        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R07        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R08        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 5Mile Region and Keyhole to EPZ Boundary R09        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R10        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R11        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R12        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R13        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R14        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R15        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R16        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R17        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R18        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 R19        3:55      3:55      3:55        3:55      3:55        3:55      3:55        4:25        3:55    3:55    4:25    3:55      3:55      3:55 Staged Evacuation  2Mile Region and Keyhole to 5 Miles R20        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R21        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R22        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R23        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R24        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R25        3:50      3:50      3:50        3:50      3:50        3:50      3:50        4:20        3:50    3:50    4:20    3:50      3:50      3:50 R.E. Ginna Nuclear Power Plant                                                710                                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                          Rev. 1
 
Table 73. Time to Clear 90 Percent of the 2Mile Area within the Indicated Region Summer              Summer          Summer                Winter                          Winter            Winter    Summer      Summer Midweek                                                                  Midweek Midweek              Weekend                              Midweek                        Weekend                      Weekend    Midweek Weekend                                                                  Weekend Scenario:      (1)      (2)        (3)      (4)        (5)        (6)        (7)      (8)      (9)        (10)      (11)  (12)        (13)        (14)
Midday              Midday        Evening                Midday                          Midday            Evening    Evening      Midday Region      Good                  Good                Good        Good                            Good                        Good        Special  Roadway Rain                Rain                              Rain    Snow                  Rain    Snow Weather            Weather              Weather Weather                            Weather                      Weather      Event      Impact Unstaged Evacuation  2Mile Region R01        1:50      1:50      1:35      1:35      1:35        1:50        1:50      2:15      1:35        1:35      2:05  1:35        1:35      1:50 Unstaged Evacuation  2Mile Region and Keyhole to 5Miles R02        1:50      1:50      1:35      1:35      1:35        1:50        1:50      2:15      1:35        1:40      2:05  1:35        1:35      1:50 R04        1:50      1:50      1:35      1:35      1:35        1:50        1:50      2:15      1:35        1:35      2:05  1:35        1:35      1:50 R05        1:50      1:50      1:35      1:35      1:35        1:50        1:50      2:15      1:35        1:35      2:05  1:35        1:35      1:50 R06        1:50      1:50      1:35      1:35      1:35        1:50        1:50      2:15      1:35        1:35      2:05  1:35        1:35      1:50 R07        1:50      1:50      1:35      1:35      1:35        1:50        1:50      2:15      1:35        1:35      2:05  1:35        1:35      1:50 R08        1:50      1:50      1:35      1:35      1:35        1:50        1:50      2:15      1:35        1:35      2:05  1:35        1:35      1:50 Staged Evacuation  2Mile Region and Keyhole to 5Miles R20        2:00      2:00      1:55      1:55      1:55        2:00        2:00      2:25      1:55        1:55      2:25  1:55        1:55      2:00 R21        1:55      1:55      1:40      1:40      1:40        1:55        1:55      2:20      1:40        1:40      2:10  1:40        1:40      1:55 R22        1:55      1:55      1:50      1:50      1:50        1:55        1:55      2:25      1:50        1:50      2:20  1:50        1:50      1:55 R23        1:55      1:55      1:50      1:50      1:50        1:55        1:55      2:25      1:50        1:50      2:20  1:50        1:50      1:55 R24        1:55      1:55      1:50      1:50      1:50        1:55        1:55      2:25      1:50        1:50      2:20  1:50        1:50      1:55 R25        1:55      1:55      1:50      1:50      1:50        1:55        1:55      2:25      1:50        1:50      2:20  1:50        1:50      1:55 R.E. Ginna Nuclear Power Plant                                            711                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                        Rev. 1
 
Table 74. Time to Clear 100 Percent of the 2Mile Area within the Indicated Region Summer              Summer          Summer                Winter                            Winter            Winter    Summer      Summer Midweek                                                                    Midweek Midweek              Weekend                                Midweek                          Weekend                      Weekend      Midweek Weekend                                                                    Weekend Scenario:      (1)        (2)      (3)        (4)          (5)        (6)        (7)        (8)      (9)        (10)      (11)  (12)        (13)        (14)
Midday              Midday          Evening              Midday                            Midday            Evening    Evening      Midday Region      Good                  Good                  Good      Good                              Good                        Good      Special    Roadway Rain                Rain                              Rain      Snow                  Rain      Snow Weather              Weather                Weather    Weather                          Weather                      Weather      Event      Impact Unstaged Evacuation  2Mile Region R01        3:45      3:45      3:45      3:45        3:45      3:45      3:45        4:15      3:45        3:45      4:15  3:45        3:45        3:45 Unstaged Evacuation  2Mile Region and Keyhole to 5Miles R02        3:45      3:45      3:45      3:45        3:45      3:45      3:50        4:15      3:45        3:45      4:15  3:45        3:45        3:45 R04        3:45      3:45      3:45      3:45        3:45      3:50      3:45        4:15      3:45        3:45      4:15  3:45        3:45        3:45 R05        3:45      3:45      3:45      3:45        3:45      3:45      3:45        4:15      3:45        3:45      4:15  3:45        3:45        3:45 R06        3:45      3:50      3:45      3:45        3:45      3:45      3:45        4:15      3:45        3:45      4:15  3:45        3:45        3:50 R07        3:45      3:45      3:45      3:45        3:45      3:45      3:45        4:15      3:45        3:45      4:15  3:45        3:45        3:45 R08        3:45      3:45      3:45      3:45        3:45      3:50      3:45        4:15      3:45        3:45      4:15  3:45        3:45        3:45 Staged Evacuation  2Mile Region and Keyhole to 5Miles R20        3:45      3:45      3:45      3:45        3:45      3:50      3:45        4:20      3:45        3:45      4:15  3:45        3:45        3:45 R21        3:45      3:45      3:45      3:45        3:45      3:45      3:45        4:20      3:45        3:45      4:15  3:45        3:45        3:50 R22        3:45      3:45      3:45      3:45        3:45      3:50      3:45        4:20      3:45        3:45      4:15  3:45        3:45        3:45 R23        3:45      3:45      3:45      3:45        3:45      3:45      3:45        4:15      3:45        3:45      4:15  3:45        3:45        3:45 R24        3:45      3:45      3:45      3:45        3:45      3:45      3:45        4:15      3:45        3:45      4:15  3:45        3:45        3:45 R25        3:45      3:45      3:45      3:45        3:45      3:45      3:45        4:20      3:45        3:45      4:15  3:45        3:45        3:50 R.E. Ginna Nuclear Power Plant                                              712                                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                        Rev. 1
 
Table 75. Description of Evacuation Regions Basic Regions ERPA Region      Description      Degrees      W1  W2    W3  W4  W5  W6    W7    M1  M2    M3    M4  M5    M6  M7  M8 M9 R01        2Mile Region                    x R02        5Mile Region                    x    x      x                              x R03          Full EPZ                      x    x      x    x    x      x    x      x      x    x      x      x    x    x    x  x Evacuate 2Mile Region and Downwind to 5 Miles ERPA Region  Wind Direction From:  Degrees      W1  W2    W3  W4  W5  W6    W7    M1  M2    M3    M4  M5    M6  M7  M8 M9 R04              N            349  11    x    x R05        NNE, NE, ENE        12  78    x    x                                      x R06            E, ESE        79  124      x                                            x SE, SSE, S, SSW, SW  125  236                                              See Region R01 R07          WSW, W          237  281    x            x R08      WNW, NW, NNW        282  348    x    x      x Evacuate 5Mile Region and Downwind to the EPZ Boundary ERPA Region  Wind Direction From:  Degrees      W1  W2    W3  W4  W5  W6    W7    M1  M2    M3    M4  M5    M6  M7  M8 M9 R09              N            349  11    x    x      x          x      x    x      x      x                  x R10            NNE            12  33      x    x      x                        x      x      x    x      x      x          x R11              NE            34  56      x    x      x                        x      x      x    x      x      x    x    x    x  x R12            ENE            57  78      x    x      x                              x      x    x      x      x    x    x    x  x R13              E            79  101    x    x      x                              x            x      x            x    x    x  x R14              ESE          102  124    x    x      x                              x                                x          x SE, SSE, S, SSW, SW  125  236                                              See Region R02 R15            WSW            237  258    x    x      x    x                        x R16              W          259  281    x    x      x    x    x                  x R17            WNW            282  303    x    x      x    x    x      x            x R18            NW            304  326    x    x      x    x    x      x    x      x R19            NNW            327  348    x    x      x          x      x    x      x Staged Evacuation  2Mile Region Evacuates, then Evacuate Downwind to 5 Miles ERPA Region  Wind Direction From:  Degrees      W1  W2    W3  W4  W5  W6    W7    M1  M2    M3    M4  M5    M6  M7  M8 M9 R20          No Wind                      x    x      x                              x R21              N            349  11    x    x R22        NNE, NE, ENE        12  78    x    x                                      x R23            E, ESE        79  124      x                                            x SE, SSE, S, SSW, SW  125  236                                              See Region R01 R24          WSW, W          237  281    x            x R25      WNW, NW, NNW        282  348    x    x      x Key ERPA Evacuate              ERPA ShelterinPlace                    ShelterinPlace until 90% ETE for R01, then Evacuate R.E. Ginna Nuclear Power Plant                            713                                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Figure 71. Voluntary Evacuation Methodology R.E. Ginna Nuclear Power Plant                      714                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                  Rev. 1
 
Figure 72. R.E. Ginna Nuclear Power Plant Shadow Region R.E. Ginna Nuclear Power Plant                            715                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
Figure 73. Congestion Patterns at 30 Minutes after the Advisory to Evacuate R.E. Ginna Nuclear Power Plant                                    716                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                  Rev. 1
 
Figure 74. Congestion Patterns at 1 Hour after the Advisory to Evacuate R.E. Ginna Nuclear Power Plant                                  717                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Figure 75. Congestion Patterns at 2 Hours after the Advisory to Evacuate R.E. Ginna Nuclear Power Plant                                  718                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Figure 76. Congestion Patterns at 2 Hours and 30 Minutes after the Advisory to Evacuate R.E. Ginna Nuclear Power Plant                                          719                                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                              Rev. 1
 
Figure 77. Congestion Patterns at 3 Hours and 10 Minutes after the Advisory to Evacuate R.E. Ginna Nuclear Power Plant                                          720                                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                              Rev. 1
 
Evacuation Time Estimates Summer, Midweek, Midday, Good (Scenario 1) 2Mile Region        5Mile Region      Entire EPZ        90%        100%
50 45 40 Vehicles Evacuating 35 30 25 (Thousands) 20 15 10 5
0 0      30          60      90      120      150        180      210        240      270 Elapsed Time After Evacuation Recommendation (min)
Figure 78. Evacuation Time Estimates  Scenario 1 for Region R03 Evacuation Time Estimates Summer, Midweek, Midday, Rain (Scenario 2) 2Mile Region        5Mile Region      Entire EPZ        90%        100%
50 45 40 Vehicles Evacuating 35 30 25 (Thousands) 20 15 10 5
0 0      30          60      90      120      150        180      210        240      270 Elapsed Time After Evacuation Recommendation (min)
Figure 79. Evacuation Time Estimates  Scenario 2 for Region R03 R.E. Ginna Nuclear Power Plant                                      721                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Evacuation Time Estimates Summer, Weekend, Midday, Good (Scenario 3) 2Mile Region        5Mile Region      Entire EPZ        90%        100%
50 45 40 Vehicles Evacuating 35 30 25 (Thousands) 20 15 10 5
0 0      30          60      90      120      150        180      210        240      270 Elapsed Time After Evacuation Recommendation (min)
Figure 710. Evacuation Time Estimates  Scenario 3 for Region R03 Evacuation Time Estimates Summer, Weekend, Midday, Rain (Scenario 4) 2Mile Region        5Mile Region      Entire EPZ        90%        100%
50 45 40 Vehicles Evacuating 35 30 25 (Thousands) 20 15 10 5
0 0      30          60      90      120      150        180      210        240      270 Elapsed Time After Evacuation Recommendation (min)
Figure 711. Evacuation Time Estimates  Scenario 4 for Region R03 R.E. Ginna Nuclear Power Plant                                      722                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Evacuation Time Estimates Summer, Midweek, Weekend, Evening, Good (Scenario 5) 2Mile Region        5Mile Region      Entire EPZ        90%        100%
50 45 40 Vehicles Evacuating 35 30 25 (Thousands) 20 15 10 5
0 0        30          60      90      120      150        180      210        240      270 Elapsed Time After Evacuation Recommendation (min)
Figure 712. Evacuation Time Estimates  Scenario 5 for Region R03 Evacuation Time Estimates Winter, Midweek, Midday, Good (Scenario 6) 2Mile Region        5Mile Region      Entire EPZ        90%        100%
50 45 40 Vehicles Evacuating 35 30 25 (Thousands) 20 15 10 5
0 0        30          60      90      120      150        180      210        240      270 Elapsed Time After Evacuation Recommendation (min)
Figure 713. Evacuation Time Estimates  Scenario 6 for Region R03 R.E. Ginna Nuclear Power Plant                                        723                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                  Rev. 1
 
Evacuation Time Estimates Winter, Midweek, Midday, Rain (Scenario 7) 2Mile Region        5Mile Region      Entire EPZ        90%        100%
50 45 40 Vehicles Evacuating 35 30 25 (Thousands) 20 15 10 5
0 0      30          60      90      120      150        180      210        240      270 Elapsed Time After Evacuation Recommendation (min)
Figure 714. Evacuation Time Estimates  Scenario 7 for Region R03 Evacuation Time Estimates Winter, Midweek, Midday, Snow (Scenario 8) 2Mile Region        5Mile Region      Entire EPZ        90%        100%
50 45 40 Vehicles Evacuating 35 30 25 (Thousands) 20 15 10 5
0 0      30          60      90      120      150        180      210        240      270 Elapsed Time After Evacuation Recommendation (min)
Figure 715. Evacuation Time Estimates  Scenario 8 for Region R03 R.E. Ginna Nuclear Power Plant                                      724                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Evacuation Time Estimates Winter, Weekend, Midday, Good (Scenario 9) 2Mile Region        5Mile Region      Entire EPZ        90%        100%
50 45 40 Vehicles Evacuating 35 30 25 (Thousands) 20 15 10 5
0 0      30          60      90      120      150        180      210        240      270 Elapsed Time After Evacuation Recommendation (min)
Figure 716. Evacuation Time Estimates  Scenario 9 for Region R03 Evacuation Time Estimates Winter, Weekend, Midday, Rain (Scenario 10) 2Mile Region        5Mile Region      Entire EPZ        90%        100%
50 45 40 Vehicles Evacuating 35 30 25 (Thousands) 20 15 10 5
0 0      30          60      90      120      150        180      210        240      270 Elapsed Time After Evacuation Recommendation (min)
Figure 717. Evacuation Time Estimates  Scenario 10 for Region R03 R.E. Ginna Nuclear Power Plant                                      725                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Evacuation Time Estimates Winter, Weekend, Midday, Snow (Scenario 11) 2Mile Region        5Mile Region      Entire EPZ        90%        100%
50 45 40 Vehicles Evacuating 35 30 25 (Thousands) 20 15 10 5
0 0      30          60      90      120      150        180      210        240      270 Elapsed Time After Evacuation Recommendation (min)
Figure 718. Evacuation Time Estimates  Scenario 11 for Region R03 Evacuation Time Estimates Winter, Midweek, Weekend, Evening, Good (Scenario 12) 2Mile Region        5Mile Region      Entire EPZ        90%        100%
50 45 40 Vehicles Evacuating 35 30 25 (Thousands) 20 15 10 5
0 0      30          60      90      120      150        180      210        240      270 Elapsed Time After Evacuation Recommendation (min)
Figure 719. Evacuation Time Estimates  Scenario 12 for Region R03 R.E. Ginna Nuclear Power Plant                                      726                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Evacuation Time Estimates Summer, Weekend, Midday, Good, Special Event (Scenario 13) 2Mile Region        5Mile Region      Entire EPZ        90%        100%
50 45 40 Vehicles Evacuating 35 30 25 (Thousands) 20 15 10 5
0 0      30          60      90      120      150        180      210        240      270 Elapsed Time After Evacuation Recommendation (min)
Figure 720. Evacuation Time Estimates  Scenario 13 for Region R03 Evacuation Time Estimates Summer, Midweek, Midday, Good, Roadway Impact (Scenario 14) 2Mile Region        5Mile Region      Entire EPZ        90%        100%
50 45 40 Vehicles Evacuating 35 30 25 (Thousands) 20 15 10 5
0 0      30          60      90      120      150        180      210        240      270 Elapsed Time After Evacuation Recommendation (min)
Figure 721. Evacuation Time Estimates  Scenario 14 for Region R03 R.E. Ginna Nuclear Power Plant                                      727                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
8    TRANSITDEPENDENT AND SPECIAL FACILITY EVACUATION TIME ESTIMATES This section details the analyses applied and the results obtained in the form of evacuation time estimates for transit vehicles. The demand for transit service reflects the needs of three population groups: (1) residents with no vehicles available; (2) residents of special facilities such as schools, and medical facilities; and (3) homebound special needs population.
These transit vehicles mix with the general evacuation traffic that is comprised mostly of passenger cars (pcs). The presence of each transit vehicle in the evacuating traffic stream is represented within the modeling paradigm described in Appendix D as equivalent to two pcs.
This equivalence factor represents the longer size and more sluggish operating characteristics of a transit vehicle, relative to those of a pc.
Transit vehicles must be mobilized in preparation for their respective evacuation missions.
Specifically:
* Bus drivers must be alerted
* They must travel to the bus depot
* They must be briefed there and assigned to a route or facility These activities consume time. Based on discussion with the offsite agencies, it is estimated that bus mobilization time will average approximately 90 minutes extending from the Advisory to Evacuate, to the time when buses first arrive at the facility to be evacuated, unless county data states otherwise.
During this mobilization period, other mobilization activities are taking place. One of these is the action taken by parents, neighbors, relatives and friends to pick up children from school prior to the arrival of buses, so that they may join their families. Virtually all studies of evacuations have concluded that this bonding process of uniting families is universally prevalent during emergencies and should be anticipated in the planning process. The current public information disseminated to residents of the Ginna EPZ indicates that schoolchildren will be evacuated to receiving locations, and that parents should pick schoolchildren up at these receiving locations. As discussed in Section 2, this study assumes a fast breaking general emergency. Therefore, children are evacuated to host schools. Picking up children at school could add to traffic congestion at the schools, delaying the departure of the buses evacuating schoolchildren, which may have to return in a subsequent wave to the EPZ to evacuate the transitdependent population. This report provides estimates of buses under the assumption that no children will be picked up by their parents (in accordance with NUREG/CR7002), to present an upper bound estimate of buses required. It is assumed that children at daycare centers are picked up by parents or guardians and that the time to perform this activity is included in the trip generation times discussed in Section 5.
The procedure for computing transitdependent ETE is to:
* Estimate demand for transit service
* Estimate time to perform all transit functions R.E. Ginna Nuclear Power Plant                  81                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
* Estimate route travel times to the EPZ boundary and to the reception centers/receiving locations 8.1    Transit Dependent People Demand Estimate The telephone survey (see Appendix F) results were used to estimate the portion of the population requiring transit service:
* Those persons in households that do not have a vehicle available.
* Those persons in households that do have vehicle(s) that would not be available at the time the evacuation is advised.
In the latter group, the vehicle(s) may be used by a commuter(s) who does not return (or is not expected to return) home to evacuate the household.
Table 81 presents estimates of transitdependent people. Note:
* Estimates of persons requiring transit vehicles include schoolchildren. For those evacuation scenarios where children are at school when an evacuation is ordered, separate transportation is provided for the schoolchildren. The actual need for transit vehicles by residents is thereby less than the given estimates. However, estimates of transit vehicles are not reduced when schools are in session.
* It is reasonable and appropriate to consider that many transitdependent persons will evacuate by ridesharing with neighbors, friends or family. For example, nearly 80 percent of those who evacuated from Mississauga, Ontario who did not use their own cars, shared a ride with neighbors or friends. Other documents report that approximately 70 percent of transit dependent persons were evacuated via ride sharing. We will adopt a conservative estimate that 50 percent of transit dependent persons will ride share, in accordance with NUREG/CR7002.
The estimated number of bus trips needed to service transitdependent persons is based on an estimate of average bus occupancy of 30 persons at the conclusion of the bus run. Transit vehicle seating capacities typically equal or exceed 60 children on average (roughly equivalent to 40 adults). If transit vehicle evacuees are two thirds adults and one third children, then the number of adult seats taken by 30 persons is 20 + (2/3 x10) = 27. On this basis, the average load factor anticipated is (27/40) x 100 = 68 percent. Thus, if the actual demand for service exceeds the estimates of Table 81 by 50 percent, the demand for service can still be accommodated by the available bus seating capacity.
2 20          10      40 1.5 1.00 3
Table 81 indicates that transportation must be provided for 2,046 people. Therefore, a total of 69 bus runs are required to transport this population to reception centers.
To illustrate this estimation procedure, we calculate the number of persons, P, requiring public transit or rideshare, and the number of buses, B, required for the Ginna Plant EPZ:
R.E. Ginna Nuclear Power Plant                    82                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
: Where, A = Percent of households with commuters C = Percent of households who will not await the return of a commuter 25,043      0.014 1.29 0.251          1.67    1    0.65  0.66  0.560    2.71    2 0.65 0.66          4,091 0.5          30    69 These calculations are explained as follows:
* All members (1.29 avg.) of households (HH) with no vehicles (1.4%) will evacuate by public transit or rideshare. The term 25,043 (number of households) x 0.014 x 1.29, accounts for these people.
* The members of HH with 1 vehicle away (25.1%), who are at home, equal (1.671).
The number of HH where the commuter will not return home is equal to (25,043 x 0.251 x 0.65 x 0.66), as 65% of EPZ households have a commuter, 66% of which would not return home in the event of an emergency. The number of persons who will evacuate by public transit or rideshare is equal to the product of these two terms.
* The members of HH with 2 vehicles that are away (56.0%), who are at home, equal (2.71 - 2). The number of HH where neither commuter will return home is equal to 25,043 x 0.56 x (0.65 x 0.66)2. The number of persons who will evacuate by public transit or rideshare is equal to the product of these two terms (the last term is squared to represent the probability that neither commuter will return).
* Households with 3 or more vehicles are assumed to have no need for transit vehicles.
* The total number of persons requiring public transit is the sum of such people in HH with no vehicles, or with 1 or 2 vehicles that are away from home.
Table 81 far exceeds the number of registered transitdependent persons in the EPZ as provided by the counties (discussed below in Section 8.5). This is consistent with the findings of NUREG/CR6953, Volume 2, in that a large majority of the transitdependent population within the EPZs of U.S. nuclear plants does not register with their local emergency response agency.
R.E. Ginna Nuclear Power Plant                    83                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
8.2    School Population - Transit Demand Table 82 presents the school population and transportation requirements for the direct evacuation of all schools within the EPZ for the latest available school year. This information was provided by the local county emergency management agencies. The column in Table 82 entitled Buses Required specifies the number of buses required for each school under the following set of assumptions and estimates:
* No students will be picked up by their parents prior to the arrival of the buses.
* While many high school students commute to school using private automobiles (as discussed in Section 2.4 of NUREG/CR7002), the estimate of buses required for school evacuation do not consider the use of these private vehicles.
* Bus capacity, expressed in students per bus, is set to 70 for primary schools and 50 for middle and high schools, unless county data states otherwise.
* Those staff members who do not accompany the students will evacuate in their private vehicles.
* No allowance is made for student absenteeism, typically 3 percent daily.
It is recommended that the counties in the EPZ introduce procedures whereby the schools are contacted prior to the dispatch of buses from the depot (approximately one hour after the Advisory to Evacuate), to ascertain the current estimate of students to be evacuated. In this way, the number of buses dispatched to the schools will reflect the actual number needed. The need for buses would be reduced by any high school students who have evacuated using private automobiles (if permitted by school authorities). Those buses originally allocated to evacuate schoolchildren that are not needed due to children being picked up by their parents, can be gainfully assigned to service other facilities or those persons who do not have access to private vehicles or to ridesharing.
Table 83 presents a list of the school receiving locations for each school in the EPZ. Students will be transported to these locations where they will be subsequently retrieved by their respective families.
8.3    Medical Facility Demand Table 84 presents the census of medical facilities in the EPZ. 492 people have been identified as living in, or being treated in, these facilities. The capacity and current census for each facility were provided by the county emergency management agencies. This data includes the number of ambulatory, wheelchairbound and bedridden patients at each facility.
The transportation requirements for the medical facility population are also presented in Table
: 84. The number of ambulance runs is determined by assuming that 2 patients can be accommodated per ambulance trip; the number of wheelchair bus runs assumes 15 wheelchairs per trip and the number of bus runs estimated assumes 30 ambulatory patients per trip.
R.E. Ginna Nuclear Power Plant                      84                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
8.4    Evacuation Time Estimates for Transit Dependent People EPZ bus resources are assigned to evacuating schoolchildren (if school is in session at the time of the ATE) as the first priority in the event of an emergency. In the event that the allocation of buses dispatched from the depots to the various facilities and to the bus routes is somewhat inefficient, or if there is a shortfall of available drivers, then there may be a need for some buses to return to the EPZ from the reception center after completing their first evacuation trip, to complete a second wave of providing transport service to evacuees. For this reason, the ETE for the transitdependent population will be calculated for both a one wave transit evacuation and for two waves. Of course, if the impacted Evacuation Region is other than R03 (the entire EPZ), then there will likely be ample transit resources relative to demand in the impacted Region and this discussion of a second wave would likely not apply.
When school evacuation needs are satisfied, subsequent assignments of buses to service the transitdependent should be sensitive to their mobilization time. Clearly, the buses should be dispatched after people have completed their mobilization activities and are in a position to board the buses when they arrive at the pickup points.
Evacuation Time Estimates for transit trips were developed using both good weather and adverse weather conditions. Figure 81 presents the chronology of events relevant to transit operations. The elapsed time for each activity will now be discussed with reference to Figure 81.
Activity: Mobilize Drivers (ABC)
Mobilization is the elapsed time from the Advisory to Evacuate until the time the buses arrive at the facility to be evacuated. It is assumed that for a rapidly escalating radiological emergency with no observable indication before the fact, drivers would likely require 90 minutes to be contacted, to travel to the depot, be briefed, and to travel to the transitdependent facilities.
Mobilization time is slightly longer in adverse weather - 100 minutes when raining, 110 minutes when snowing.
Activity: Board Passengers (CD)
Based on discussions with offsite agencies, a loading time of 15 minutes (20 minutes for rain and 25 minutes for snow) for school buses is used.
For multiple stops along a pickup route (transitdependent bus routes) estimation of travel time must allow for the delay associated with stopping and starting at each pickup point. The time, t, required for a bus to decelerate at a rate, a, expressed in ft/sec/sec, from a speed, v, expressed in ft/sec, to a stop, is t = v/a. Assuming the same acceleration rate and final speed following the stop yields a total time, T, to service boarding passengers:
2            ,
Where B = Dwell time to service passengers. The total distance, s in feet, travelled during the deceleration and acceleration activities is: s = v2/a. If the bus had not stopped to service R.E. Ginna Nuclear Power Plant                    85                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
passengers, but had continued to travel at speed, v, then its travel time over the distance, s, would be: s/v = v/a. Then the total delay (i.e. pickup time, P) to service passengers is:
Assigning reasonable estimates:
* B = 50 seconds: a generous value for a single passenger, carrying personal items, to board per stop
* v = 25 mph = 37 ft/sec
* a = 4 ft/sec/sec, a moderate average rate Then, P  1 minute per stop. Allowing 30 minutes pickup time per bus run implies 30 stops per run, for good weather. It is assumed that bus acceleration and speed will be less in rain; total loading time is 40 minutes per bus in rain, 50 minutes in snow.
Activity: Travel to EPZ Boundary (DE)
School Evacuation Transportation resources available were provided by the EPZ county emergency management agencies and are summarized in Table 85. Also included in the table are the number of buses needed to evacuate schools, medical facilities, transitdependent population, homebound special needs (discussed below in Section 8.5). These numbers indicate there are sufficient resources available to evacuate everyone in a single wave.
The buses servicing the schools are ready to begin their evacuation trips at 105 minutes after the advisory to evacuate - 90 minutes mobilization time plus 15 minutes loading time - in good weather. The UNITES software discussed in Section 1.3 was used to define bus routes along the most likely path from a school being evacuated to the EPZ boundary, traveling toward the appropriate school reception center. This is done in UNITES by interactively selecting the series of nodes from the school to the EPZ boundary. Each bus route is given an identification number and is written to the DYNEV II input stream. DYNEV computes the route length and outputs the average speed for each 5 minute interval, for each bus route. The specified bus routes are documented in Table 86 (refer to the maps of the linknode analysis network in Appendix K for node locations). Data provided by DYNEV during the appropriate timeframe depending on the mobilization and loading times (i.e., 100 to 105 minutes after the advisory to evacuate for good weather) were used to compute the average speed for each route, as follows:
60        .
1    .
                                                                    .        60    .
                                  .                                    . 1  .
R.E. Ginna Nuclear Power Plant                  86                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
The average speed computed (using this methodology) for the buses servicing each of the schools in the EPZ is shown in Table 87 through Table 89 for school evacuation, and in Table 811 through Table 813 for the transit vehicles evacuating transitdependent persons, which are discussed later. The travel time to the EPZ boundary was computed for each bus using the computed average speed and the distance to the EPZ boundary along the most likely route out of the EPZ. The travel time from the EPZ boundary to the Reception Center was computed assuming an average speed of 40 mph, 35 mph, and 30 mph for good weather, rain and snow, respectively. Speeds were reduced in Table 87 through Table 89 and in Table 811 through Table 813 to 55 mph (50 mph for rain - 10% decrease - and 44 mph for snow - 20% decrease) for those calculated bus speeds which exceed 35 mph, as the school bus speed limit for state routes in New York is 55 mph.
Table 87 (good weather), Table 88 (rain) and Table 89 (snow) present the following evacuation time estimates (rounded up to the nearest 5 minutes) for schools in the EPZ: (1) The elapsed time from the Advisory to Evacuate until the bus exits the EPZ; and (2) The elapsed time until the bus reaches the School Reception Center. The evacuation time out of the EPZ can be computed as the sum of times associated with Activities ABC, CD, and DE (For example: 90 min. + 15 + 22 = 2:10 for Klem Road North Elementary School, with good weather, rounded up to the nearest 5 minutes). The evacuation time to the School Reception Center is determined by adding the time associated with Activity EF (discussed below), to this EPZ evacuation time.
Evacuation of TransitDependent Population The buses dispatched from the depots to service the transitdependent evacuees will be scheduled so that they arrive at their respective routes after their passengers have completed their mobilization. As shown in Figure 54 (Residents with no Commuters), 90 percent of the evacuees will complete their mobilization when the buses will begin their routes, approximately 90 minutes after the Advisory to Evacuate. The county plans identify bus routes and number of busses assigned to each route for all ERPA (Table 810). The start of service on these routes is separated by 10 or 20 minute headways, as shown in Table 811 through Table 813. The use of bus headways ensures that those people who take longer to mobilize will be picked up.
Mobilization time is 10 minutes longer in rain and 20 minutes longer in snow to account for slower travel speeds and reduced roadway capacity.
Those buses servicing the transitdependent evacuees will first travel along their pickup routes, then proceed out of the EPZ. Transitdependent pickup locations are provided annually to EPZ residents in the emergency preparedness brochure. It is assumed that residents will walk to and congregate at these predesignated pickup locations, and that they can arrive at the stops within the 90 minute bus mobilization time (good weather).
As previously discussed, a pickup time of 30 minutes (good weather) is estimated for 30 individual stops to pick up passengers, with an average of one minute of delay associated with each stop. Longer pickup times of 40 minutes and 50 minutes are used for rain and snow, respectively.
R.E. Ginna Nuclear Power Plant                87                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
The travel distance along the respective pickup routes within the EPZ is estimated using the UNITES software. Bus travel times within the EPZ are computed using average speeds computed by DYNEV, using the aforementioned methodology that was used for school evacuation.
Table 811 through Table 813 present the transitdependent population evacuation time estimates for each bus route calculated using the above procedures for good weather, rain and snow, respectively.
For example, the ETE for ERPA M1 Route A is computed as 90 + 51 + 30 = 2:55 for good weather (rounded up to nearest 5 minutes). Here, 51 minutes is the time to travel 16.3 miles at 19.2 mph, the average speed output by the model for this route. The ETE for a second wave (discussed below) is presented in the event there is a shortfall of available buses or bus drivers, as previously discussed.
Activity: Travel to Reception Centers (EF)
The distances from the EPZ boundary to the reception centers are measured using GIS software along the most likely route from the EPZ exit point to the reception center. The reception centers are mapped in Figure 101. For a onewave evacuation, this travel time outside the EPZ does not contribute to the ETE. For a twowave evacuation, the ETE for buses must be considered separately, since it could exceed the ETE for the general population. Assumed bus speeds of 40 mph, 35 mph, and 30 mph for good weather, rain, and snow, respectively, will be applied for this activity for buses servicing the transitdependent population.
Activity: Passengers Leave Bus (FG)
A bus can empty within 5 minutes. The driver takes a 10 minute break.
Activity: Bus Returns to Route for Second Wave Evacuation (GC)
The buses assigned to return to the EPZ to perform a second wave evacuation of transit dependent evacuees will be those that have already evacuated transitdependent people who mobilized more quickly. The first wave of transitdependent people depart the bus, and the bus then returns to the EPZ, travels to its route and proceeds to pick up more transit dependent evacuees along the route. The travel time back to the EPZ is equal to the travel time to the reception center.
The secondwave ETE for ERPA M1 Route A is computed as follows for good weather:
* Bus arrives at reception center at 3:11 in good weather (2:55 to exit EPZ + 16 minute travel time to reception center).
* Bus discharges passengers (5 minutes) and driver takes a 10minute rest: 15 minutes.
* Bus returns to EPZ and completes second route: 16 minutes (equal to travel time to reception center) + 29 minutes (26.3 miles @ 55 mph) = 45 minutes
* Bus completes pickups along route: 30 minutes.
* Bus exits EPZ at time 2:55 + 0:16 + 0:15 + 0:45 + 0:30 = 4:45 (rounded to nearest 5 minutes) after the Advisory to Evacuate.
R.E. Ginna Nuclear Power Plant                    88                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
The ETE for the completion of the second wave for all transitdependent bus routes are provided in Table 811 through Table 813. The average ETE for a twowave evacuation of transitdependent people exceeds the ETE for the general population at the 90th percentile.
The relocation of transitdependent evacuees from the reception centers to congregate care centers, if the counties decide to do so, is not considered in this study.
Evacuation of Medical Facilities The bus operations for this group are similar to those for school evacuation except:
* Vans are assigned on the basis of 12 patients to allow for staff to accompany the patients.
* The passenger loading time will be longer at approximately one minute per patient to account for the time to move patients from inside the facility to the vehicles.
Table 84 indicates that 32 van runs, 16 wheelchair bus runs and 2 ambulance runs are needed to service all of the special facilities in the EPZ. According to Table 85, the counties can collectively provide 78 vans, 20 wheelchair accessible buses and 45 ambulances. Thus, there are sufficient resources to evacuate all persons from the special facilities in a single wave.
As is done for the schools, it is estimated that mobilization time averages 90 minutes. Specially trained medical support staff (working their regular shift) will be on site to assist in the evacuation of patients. Additional staff (if needed) could be mobilized over this same 90 minute timeframe.
Table 814 through Table 816 summarize the ETE for medical facilities within the EPZ for good weather, rain, and snow. Based on the locations of the medical facilities in Figure E4, it is estimated that buses will have to travel 5 miles, on average, to leave the EPZ. Loading times of 1 minute, 5 minutes, and 15 minutes are assumed for ambulatory patients, wheelchair bound patients, and bedridden patients, respectively. Average speeds output by the model for Scenario 6 (Scenario 7 for rain and Scenario 8 for snow) Region 3, capped at 55 mph (50 mph for rain and 44 mph for snow), are used to compute travel time to EPZ boundary. The travel time to the EPZ boundary is computed by dividing the average distance of 5 miles by the average travel speed. The ETE is the sum of the mobilization time, total passenger loading time, and travel time out of the EPZ. Concurrent loading on multiple buses, wheelchair buses/vans, and ambulances at capacity is assumed. All ETE are rounded to the nearest 5 minutes. For example, the calculation of ETE for the Maplewood Nursing Home with 10 ambulatory residents during good weather is:
ETE: 90 + 10 x 1 + 30 = 130 min. or 2:10.
It is assumed that special facility population is directly evacuated to appropriate host medical facilities. Relocation of this population to permanent facilities and/or passing through the reception center before arriving at the host facility are not considered in this analysis.
R.E. Ginna Nuclear Power Plant                    89                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
8.5    Special Needs Population The county emergency management agencies have a combined registration for transit dependent and homebound special needs persons. Based on data provided by the counties, there are an estimated 169 homebound special needs people within the Monroe County portion of the EPZ and 53 people within the Wayne County portion of the EPZ who require transportation assistance to evacuate. In total there are 113 ambulatory persons, 47 wheelchairbound persons and 62 bedridden persons.
ETE for Homebound Special Needs Persons Table 817 summarizes the ETE for homebound special needs people. The table is categorized by type of vehicle required and then broken down by weather condition. The table takes into consideration the deployment of multiple vehicles to reduce the number of stops per vehicle.
It is conservatively assumed that ambulatory and wheelchair bound special needs households are spaced 3 miles apart and bedridden households are spaced 5 miles apart. Van and bus speeds approximate 20 mph between households and ambulance speeds approximate 30 mph in good weather (10% slower in rain, 20% slower in snow). Mobilization times of 90 minutes were used (100 minutes for rain, and 110 minutes for snow). The last HH is assumed to be 5 miles from the EPZ boundary, and the networkwide average speed, capped at 40 mph (35 mph for rain and 30 mph for snow), after the last pickup is used to compute travel time. ETE is computed by summing mobilization time, loading time at first household, travel to subsequent households, loading time at subsequent households, and travel time to EPZ boundary. All ETE are rounded to the nearest 5 minutes.
For example, assuming no more than one special needs person per HH implies that 113 ambulatory households need to be serviced. While only 11 vans are needed from a capacity perspective, if 29 vans are deployed to service these special needs HH, then each would require about 4 stops. The following outlines the ETE calculations:
: 1. Assume 29 vans are deployed, each with about 4 stops, to service a total of 113 HH.
: 2. The ETE is calculated as follows:
: a. Vans arrive at the first pickup location: 90 minutes
: b. Load HH members at first pickup: 5 minutes
: c. Travel to subsequent pickup locations: 3 @ 9 minutes = 27 minutes
: d. Load HH members at subsequent pickup locations: 3 @ 5 minutes = 15 minutes
: e. Travel to EPZ boundary: 11 minutes (5 miles at 26.5 mph).
ETE: 90 + 5 + 27 + 15 + 11 = 2:30 rounded up to the nearest 5 minutes R.E. Ginna Nuclear Power Plant                    810                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
(Subsequent Wave)
A        B            C                D              E          F    G Time Event A  Advisory to Evacuate B  Bus Dispatched from Depot C  Bus Arrives at Facility/Pickup Route D  Bus Departs for Reception Center E  Bus Exits Region F  Bus Arrives at Reception Center/Receiving Location G  Bus Available for Second Wave Evacuation Service Activity AB Driver Mobilization BC Travel to Facility or to Pickup Route CD Passengers Board the Bus DE Bus Travels Towards Region Boundary EF Bus Travels Towards Reception Center Outside the EPZ FG Passengers Leave Bus; Driver Takes a Break Figure 81. Chronology of Transit Evacuation Operations R.E. Ginna Nuclear Power Plant                                811                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                          Rev. 1
 
Figure 82. Monroe County Transit Dependent Bus Routes R.E. Ginna Nuclear Power Plant                          812                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                            Rev. 1
 
Figure 83. Wayne County Transit Dependent Bus Routes R.E. Ginna Nuclear Power Plant                          813                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
Table 81. TransitDependent Population Estimates Survey Average HH                                                        Survey                                      Percent Size                      Survey Percent HH        Survey    Percent HH  Total                People    Population with Indicated No. of  Estimated  with Indicated No. of    Percent HH    with Non  People    Estimated  Requiring  Requiring 2010 EPZ          Vehicles          No. of          Vehicles              with      Returning Requiring Ridesharing  Public      Public Population      0      1      2  Households  0        1        2    Commuters    Commuters  Transport Percentage  Transit      Transit 64,109      1.29    1.67  2.71    25,043  1.4%    25.1%    56.0%      65%          66%      4,091      50%      2,046        3.2%
R.E. Ginna Nuclear Power Plant                                      814                                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                              Rev. 1
 
Table 82. School and Evacuating Preschool Population Demand Estimates Bus Runs ERPA                      School Name                    Enrollment      Staff      Required SCHOOLS M1        Schlegel Road Elementary School                    512          77            8 M4        Spry Middle School                                1,048        161            17 M4        State Road Elementary School                        536          69            9 M6        Klem Road North Elementary School                  534          66            9 M6        Klem Road South Elementary School                  533          70            9 M6        Webster Christian School                            220          38            4 M7        Schroeder High School                              1,504        308            26 M9        Thomas High School                                1,388        216            23 M9        Willink Middle School                              977          163            16 W2        James A. Beneway High School                        811          148            20 W2        Ontario Elementary School                          356          194            8 W2        Ontario Primary School                              347          40            6 W2        Thomas C. Armstrong Middle School                  549          166            15 W5        Wayne Education Center                              179          37            5 W5        Wayne Finger Lake BOCES                              19            7            1 W5        Wayne Technical & Career Center                    231          44            6 W5        Williamson Elementary School                        460          85            8 W5        Williamson Middle School                            325          95            9 W5        Williamson Senior High School                      378          100            10 W6        Marion Central Middle/High School                  563          76            13 W7        Freewill Elementary School                          314          52            6 S.R.        Dewitt Road Elementary School                      517          73            8 S.R.        Marion Elementary School                            625          83            11 S.R.        Plank Road North Elementary School                  576          63            9 S.R.        Plank Road South Elementary School                  557          80            9 S.R.        Rochester Christian School                          106          20            2 S.R.        St Rita's School                                    332          33            5 Schools Subtotal:    14,497        2,564          272 PRESCHOOLS M7        Webster Montessori School                          118          23            2 W2        Hop Skip & Jump Preschool                            89            7            2 W2        Rhyme Tyme Child Care Center                        74            6            2 W2        The Tot Spot Day Care Center                        155          12            3 W4        Raggedy Ann & Andy Day Care                          22            2            1 W5        Lake Ontario Child Development                      78            6            2 Preschools Subtotal:      536          56            12 TOTAL:      15,033        2,620          284 R.E. Ginna Nuclear Power Plant                      815                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
Table 83. School and Preschool Receiving Locations School/Preschool                          Receiving Location Dewitt Road Elementary School Klem Road North Elementary School Klem Road South Elementary School Plank Road North Elementary School Plank Road South Elementary School Rochester Christian School Schlegel Road Elementary School Schroeder High School                            Monroe Community College Spry Middle School St Ritas School State Road Elementary School Thomas High School Webster Christian School Webster Montessori School Willink Middle School Lake Ontario Child Development Raggedy Ann & Andy Day Care Wayne Education Center Wayne Finger Lake BOCES Newark High School Wayne Technical & Career Center Williamson Elementary School Williamson Middle School Williamson Senior High School Marion Central Middle/High School Newark Middle School Marion Elementary School Freewill Elementary School Hop Skip & Jump Preschool James A. Beneway High School Ontario Elementary School PalmyraMacedon High School Ontario Primary School Rhyme Tyme Child Care Center The Tot Spot Day Care Center Thomas C. Armstrong Middle School R.E. Ginna Nuclear Power Plant                      816                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                            Rev. 1
 
Table 84. Special Facility Transit Demand Wheel Wheel                  chair Cap      Current    Ambu  chair  Bed  Van        Bus ERPA                    Facility Name            Municipality      acity      Census    latory Bound  ridden Runs      Runs    Ambulance MONROE COUNTY M4    Maplewood Nursing Home                  Webster            74            73        10    63      0    1        5            0 M7    Cherry Ridge                            Webster          273          273      206    64      3    18        5            2 M7    AHEPA 67                                Webster            50            50        45      5      0    4        1            0 M7    Quinby Park Apartments                  Webster            49            49        45      4      0    4        1            0 Monroe County Subtotal:    446          445      306    136    3    27        12            2 WAYNE COUNTY W1      Ontario Community Residence              Ontario            10            10        7      3      0    1        1            0 W2      Pines of Peace Hospice Center            Ontario            2            2        1      1      0    1        1            0 W5      Williamson Community Residence          Williamson          7            7        5      2      0    1        1            0 W7      Wayne ARC Day Activity Training Program Walworth            28            28        19      9      0    2        1            0 Wayne County Subtotal:      47            47        32    15      0    5        4            0 TOTAL:      493          492      338    151    3    32        16            2 R.E. Ginna Nuclear Power Plant                                      817                                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                      Rev. 1
 
Table 85. Summary of Transportation Resources Transportation                                          Wheelchair Wheelchair Resource                        Buses    Vans        Buses    Vans      Ambulances Resources Available Regional Transit Service Inc.                        250 Monroe County EMS Coordinator                                                10 Medical Motor Services                              14        30                    40 Rochester Medical Transport Genesee Transportation Paratransit                                                    48 A&E Medical Transport                                                        10 Wayne Area Transportation Services (WATS)            12 Wayne Central School District                        17 Ganada Central School District                      17 Penfield Central School District                      5 Marion Central School District                        6 Lyons Central School District                        12 Sodus Central School District                        20 Newark School District                                4 PalmyraMacedon School District                      3 Wayne County Nursing Home                                                              3 Local Fire Departments and Towns                                                                    45 TOTAL:      360        78          20      43            45 Resources Needed Schools (Table 82):      284 Medical Facilities (Table 84):                32          16                      2 TransitDependent Population (Table 810):          69 Homebound Special Needs (Section 8.5):                      29                    16            31 TOTAL TRANSPORTATION NEEDS:              353        61          16      16            33 R.E. Ginna Nuclear Power Plant                      818                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
Table 86. Bus Route Descriptions Bus Route Number              Description                  Nodes Traversed from Route Start to EPZ Boundary Raggedy Ann & Lake Ontario 1                                      38, 39, 928, 40, 778, 793, 41, 42 Child Magic Years & Williamson 2                                      38, 186, 116, 187, 188, 189, 190, 191, 192, 193 Schools 3      Marion High School            189, 190, 191, 192, 193 4      Ontario Schools                29, 30, 74, 903, 75, 76, 77, 78, 1025, 79 5      Freewill Elementary School    77, 78, 1025, 79 6      Webster Schools                22, 21, 20, 19, 18, 920, 747 7      Webster Christian School      289, 923, 290, 755, 20, 19, 18, 920, 747 8      Klem Schools                  295, 303, 304, 305, 416, 921, 417, 18, 920, 747 Thomas High, Willink &
9                                      417, 18, 920, 747 Schroeder 10      Webster Montessori School      422, 375, 411 20      Maplewood Nursing Home        264, 358, 766, 294, 293, 292, 291, 290, 755, 20, 19, 18, 920 21      Cherry Ridge                  761, 361, 362, 419, 981, 418, 417, 18, 920 AHEPA 67 and Quimby Park 22                                    635, 299, 298, 751, 297, 753, 19, 18, 920 Apartments Ontario Community 23                                    636, 637, 893, 34, 35, 36, 37, 38, 39, 928, 40, 778, 793, 41 Residence Pines of Peace Hospice 24                                    100, 112, 34, 35, 36, 37, 38, 39, 928, 40, 778, 793, 41 Center Williamson Community 25                                    115, 116, 186, 38, 39, 928, 40, 778, 793, 41 Residence Wayne ARC Day Activity 26                                    105, 662, 663, 659, 664, 665, 666, 796, 192 Training Program 341, 136, 137, 138, 886, 25, 26, 27, 28, 29, 30, 74, 903, 75, 76, 77, 30      W1 Route 1 78, 1025, 79 954, 209, 71, 211, 773, 772, 891, 31, 30, 74, 903, 75, 76, 77, 78, 31      W1 Route 2 1025, 79 32      W1 Route 3                    95, 96, 97, 98, 99, 892, 32, 31, 30, 74, 903, 75, 76, 77, 78, 1025, 79 33      W2 Route 1                    903, 101, 102, 103, 654, 655, 656, 657, 658, 659, 1026, 660 34      W2 Route 2                    27, 28, 29, 30, 74, 903, 75, 76, 77, 78, 1025, 79 93, 349, 74, 774, 100, 112, 113, 114, 776, 115, 116, 187, 188, 189, 35      W2 Route 3 190, 191, 192, 193 212, 636, 637, 893, 34, 112, 113, 114, 776, 115, 116, 186, 38, 39, 36      W3 Route 1 928, 40, 778, 793, 41, 42 37      W3 Route 2                    791, 790, 216, 111, 217, 218, 219, 220, 221, 222 38      W4 Route                      641, 897, 39, 928, 40, 778, 793, 41, 42 39      W4 Route 2                    218, 219, 220, 221, 683, 899, 41, 42 40      W5 Route 1                    112, 113, 114, 36, 37, 38, 39, 928, 40, 778, 793, 41, 42 41      W5 Route 2                    189, 190, 197, 649 R.E. Ginna Nuclear Power Plant                    819                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
Bus Route Number              Description        Nodes Traversed from Route Start to EPZ Boundary 42      W5 Route 3          114, 776, 115, 116, 117, 118, 119, 120, 121, 122, 123 43      W6 Route 1          187, 188, 189, 190, 197, 649 45      W6 Route 2          188, 189, 190, 191, 192, 193 46      W6 Route 3          799, 798, 998, 797, 796, 192, 193 47      W6 Route 4          656, 657, 658, 659, 664, 665, 666, 796, 192, 193 48      W7 Route 1          144, 145, 146, 77, 78, 1025, 79 49      W7 Route 2          75, 76, 77, 146, 147, 986, 148, 149, 782, 78, 1025, 79 50      W7 Route 3          103, 654, 655, 656, 657, 658, 659, 1026, 660 51      M1 Route A          136, 137, 138, 886, 25, 24, 749, 23, 22, 21, 20, 19, 18, 920 136, 225, 228, 239, 251, 252, 253, 254, 255, 256, 257, 258, 259, 52      M1 Route B 260, 261, 926, 262, 757, 21, 20, 19, 18, 920 53      M2 Route C          233, 232, 231, 23, 22, 21, 20, 19, 18, 920 230, 242, 256, 257, 258, 259, 260, 261, 926, 262, 757, 21, 20, 19, 54      M3 Route D 18, 920 246, 883, 261, 926, 262, 263, 927, 264, 770, 265, 266, 267, 268, 55      M4 Route E 269, 270 758, 760, 750, 231, 232, 233, 357, 249, 264, 770, 265, 266, 267, 56      M4 Route F 268, 269, 270 57      M4 Route G          926, 262, 263, 927, 264, 770, 265, 266, 267, 268, 269, 270 58      M5 Route H          404, 406, 407, 1020, 237, 336, 269, 270 59      M5 Route I          406, 407, 1020, 1021, 238, 337, 270 60      M6 Route J          251, 287, 288, 289, 923, 290, 755, 20, 19, 18, 920 61      M6 Route K          251, 287, 342, 300, 343, 344, 345, 346, 347, 332, 333, 312 62      M6 Route L          258, 951, 634, 289, 295, 296, 922, 297, 753, 19, 18, 920 63      M7 Route M          766, 294, 359, 299, 298, 751, 297, 753, 19, 18, 920 64      M7 Route N          418, 981, 419, 362, 363, 364, 365 65      M8 ROUTE P          348, 306, 307, 308, 309, 310, 311, 312 66      M8 Route Q          300, 343, 344, 345, 346, 347, 332, 333, 312 67      M9 Route R          295, 303, 304, 305, 306, 307, 369, 370, 1018, 365 747, 920, 18, 19, 20, 21, 22, 23, 749, 24, 25, 26, 27, 28, 29, 30, 31, 80      SR 104 EB 32, 33, 34, 35, 36, 37, 38, 39, 928, 40, 778, 793, 41 41, 793, 778, 40, 928, 39, 38, 37, 36, 35, 34, 33, 32, 31, 30, 29, 28, 81      SR 104 WB 27, 26, 25, 24, 749, 23, 22, 21, 20, 19, 18, 920, 747 82      SR 250 SB            261, 926, 262, 263, 927, 264, 770, 265, 266, 267, 268, 269, 270 83      SR 350 SB            74, 903, 75, 76, 77, 78 84      SR 21 SB              38, 186, 116, 187, 188, 189, 190, 191, 192 85      SR 286 WB            77, 146, 406, 407, 1020, 237, 336, 269 R.E. Ginna Nuclear Power Plant          820                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Table 87. School Evacuation Time Estimates  Good Weather Travel                      Travel Dist.                  Time to          Dist. EPZ    Time Driver      Loading To EPZ        Average        EPZ            Bdry to  from EPZ    ETE to Mobilization    Time      Bdry      Speed        Bdry    ETE    R.C./R.L. Bdry to    R.C./R.L School            Time (min)    (min)      (mi)      (mph)        (min)  (hr:min)  (mi.)  H.S. (min)  (hr:min)
MONROE COUNTY SCHOOLS Dewitt Road Elementary School          90          15        School is outside the EPZ      1:45    13.6        21        2:10 Klem Road North Elementary School      90          15        3.4        9.6          22    2:10    13.5        21        2:30 Klem Road South Elementary School      90          15        3.5        9.6          23    2:10    13.4        21        2:30 Plank Road North Elementary School      90          15        School is outside the EPZ      1:45    12.5        19        2:05 Plank Road South Elementary School      90          15        School is outside the EPZ      1:45    12.3        19        2:05 Rochester Christian School              90          15        School is outside the EPZ      1:45    10.8        17        2:05 Schlegel Road Elementary School        90          15        7.1        12.2          35    2:20    13.4        21        2:45 Schroeder High School                  90          15        2.3        11.5          13    2:00    13.4        21        2:20 Spry Middle School                      90          15        4.3        10.0          26    2:15    13.4        21        2:35 St Rita's School                        90          15        School is outside the EPZ      1:45    13.9        21        2:10 State Road Elementary School            90          15        5.7        10.9          32    2:20    13.4        21        2:40 Thomas High School                      90          15        1.9        11.5          11    2:00    13.4        21        2:20 Webster Christian School                90          15        4.0        10.0          25    2:10    13.5        21        2:35 Webster Montessori School              90          15        0.2        11.7          2    1:50    13.1        20        2:10 Willink Middle School                  90          15        2.2        11.5          12    2:00    13.4        21        2:20 WAYNE COUNTY SCHOOLS Freewill Elementary School              47          15        3.7        37.7          6    1:10      8.4        13        1:25 Hop Skip & Jump Preschool              90          15        7.9        30.8          16    2:05      8.5        13        2:15 James A. Beneway High School            29          15        6.0        33.3          11    0:55      8.4        13        1:10 Lake Ontario Child Development          90          15        4.7        42.4          7    1:55    17.5        27        2:20 Magic Years Nursery School              90          15        6.7        44.7          10    1:55      7.7        12        2:10 Marion Central Middle/High School      90          15        2.4        44.4          4    1:50    14.0        21        2:10 Marion Elementary School                90          15        School is outside the EPZ      1:45    13.9        21        2:10 Ontario Elementary School              23          15        6.8        35.1          12    0:50      8.4        13        1:05 Ontario Primary School                  18          15        7.1        36.7          12    0:45      8.4        13        1:00 Raggedy Ann & Andy Day Care            90          15        4.2        42.4          6    1:55    17.2        26        2:20 R.E. Ginna Nuclear Power Plant                                      821                                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                              Rev. 1
 
Travel                        Travel Dist.            Time to          Dist. EPZ    Time Driver    Loading To EPZ Average      EPZ            Bdry to    from EPZ    ETE to Mobilization  Time    Bdry  Speed      Bdry    ETE    R.C./R.L. Bdry to    R.C./R.L School          Time (min)    (min)  (mi)  (mph)      (min)  (hr:min)  (mi.)  H.S. (min)  (hr:min)
Rhyme Tyme Child Care Center          90        15      7.7    30.8        15      2:00      8.4        13        2:15 The Tot Spot Day Care Center          90        15      7.4    30.6        15      2:00      8.4        13        2:15 Thomas C. Armstrong Middle School    39        15      6.0    25.3        15      1:10      8.4        13        1:25 Wayne Education Center                90        15      3.4    46.0        5      1:50    17.5        27        2:20 Wayne Finger Lake BOCES              90        15      3.4    46.0        5      1:50    17.5        27        2:20 Wayne Technical & Career Center      90        15      3.4    46.0        5      1:50    17.5        27        2:20 Williamson Elementary School          23        15      6.3    45.8        9      0:50    14.1        22        1:10 Williamson Middle School              23        15      6.3    45.8        9      0:50    14.1        22        1:10 Williamson Senior High School        23        15      5.1    45.8        7      0:45    14.1        22        1:10 Maximum for EPZ:    2:20            Maximum:      2:45 Average for EPZ:  1:45              Average:    2:05 R.E. Ginna Nuclear Power Plant                              822                                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                    Rev. 1
 
Table 88. School Evacuation Time Estimates  Rain Travel                      Travel Dist. To                Time to          Dist. EPZ Time from Driver      Loading    EPZ      Average        EPZ            Bdry to    EPZ Bdry    ETE to Mobilization    Time      Bdry        Speed        Bdry    ETE    R.C./R.L. to H.S. R.C./R.L School            Time (min)      (min)      (mi)        (mph)      (min)  (hr:min)  (mi.)      (min)    (hr:min)
MONROE COUNTY SCHOOLS Dewitt Road Elementary School        100          20          School is outside the EPZ      2:00    13.6        24        2:25 Klem Road North Elementary School    100          20        3.4        13.7        16    2:20    13.5        24        2:40 Klem Road South Elementary School    100          20        3.5        13.7        16    2:20    13.4        24        2:40 Plank Road North Elementary School    100          20          School is outside the EPZ      2:00    12.5        22        2:25 Plank Road South Elementary School    100          20          School is outside the EPZ      2:00    12.3        22        2:25 Rochester Christian School            100          20          School is outside the EPZ      2:00    10.8        19        2:20 Schlegel Road Elementary School      100          20        7.1        11.1        39    2:40    13.4        24        3:05 Schroeder High School                100          20        2.3        10.7        14    2:15    13.4        24        2:40 Spry Middle School                    100          20        4.3        8.9          29    2:30    13.4        23        2:55 St Rita's School                      100          20          School is outside the EPZ      2:00    13.9        24        2:25 State Road Elementary School          100          20        5.7        10.0        35    2:35    13.4        24        3:00 Thomas High School                    100          20        1.9        10.7        11    2:15    13.4        24        2:35 Webster Christian School              100          20        4.0        8.2          30    2:30    13.5        24        2:55 Webster Montessori School            100          20        0.2        10.8          2    2:05    13.1        23        2:25 Willink Middle School                100          20        2.2        10.7        13    2:15    13.4        24        2:40 WAYNE COUNTY SCHOOLS Freewill Elementary School            47          20        3.7        34.0          7    1:15      8.4        15        1:30 Hop Skip & Jump Preschool            100          20        7.9        38.9        13    2:15      8.5        15        2:30 James A. Beneway High School          29          20        6.0        22.2        17    1:10      8.4        15        1:25 Lake Ontario Child Development        100          20        4.7        47.2          6    2:10    17.5        30        2:40 Magic Years Nursery School            100          20        6.7        42.4        10    2:10      7.7        14        2:25 Marion Central Middle/High School    100          20        2.4        41.6          4    2:05    14.0        24        2:30 Marion Elementary School              100          20          School is outside the EPZ      2:00    13.9        24        2:25 Ontario Elementary School              23          20        6.8        24.0        18    1:05      8.4        15        1:20 Ontario Primary School                18          20        7.1        26.8        16    0:55      8.4        15        1:10 Raggedy Ann & Andy Day Care          100          20        4.2        47.2          6    2:10    17.2        30        2:40 Rhyme Tyme Child Care Center          100          20        7.7        38.9        12    2:15      8.4        15        2:30 R.E. Ginna Nuclear Power Plant                                    823                                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                Rev. 1
 
Travel                      Travel Dist. To          Time to            Dist. EPZ Time from Driver    Loading  EPZ    Average      EPZ            Bdry to    EPZ Bdry    ETE to Mobilization  Time    Bdry    Speed      Bdry    ETE    R.C./R.L. to H.S. R.C./R.L School            Time (min)    (min)  (mi)    (mph)      (min)  (hr:min)  (mi.)      (min)    (hr:min)
The Tot Spot Day Care Center        100        20      7.4      38.9        12      2:15      8.4        15        2:30 Thomas C. Armstrong Middle School    39        20      6.0      20.0        19      1:20      8.4        15        1:35 Wayne Education Center              100        20      3.4      42.4        5      2:05    17.5        30        2:35 Wayne Finger Lake BOCES              100        20      3.4      42.4        5      2:05    17.5        30        2:35 Wayne Technical & Career Center      100        20      3.4      42.4        5      2:05    17.5        30        2:35 Williamson Elementary School          23        20      6.3      40.9        10      0:55    14.1        25        1:20 Williamson Middle School              23        20      6.3      40.9        10      0:55    14.1        25        1:20 Williamson Senior High School        23        20      5.1      40.9        8      0:55    14.1        25        1:20 Maximum for EPZ:    2:40            Maximum:      3:05 Average for EPZ:  2:00              Average:    2:20 R.E. Ginna Nuclear Power Plant                              824                                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                        Rev. 1
 
Table 89. School Evacuation Time Estimates  Snow Travel            Dist. Travel Dist. To                Time to            EPZ      Time Driver      Loading      EPZ      Average        EPZ            Bdry to  from EPZ      ETE to Mobilization  Time      Bdry        Speed        Bdry    ETE    R.C./R.L. Bdry to    R.C./R.L School            Time (min)    (min)      (mi)        (mph)      (min)  (hr:min)  (mi.)  H.S. (min)  (hr:min)
MONROE COUNTY SCHOOLS Dewitt Road Elementary School        110          25          School is outside the EPZ      2:15    13.6        28        2:45 Klem Road North Elementary School    110          25        3.4        12.3        17    2:35    13.5        27        3:00 Klem Road South Elementary School    110          25        3.5        12.3        18    2:35    13.4        27        3:00 Plank Road North Elementary School    110          25          School is outside the EPZ      2:15    12.5        26        2:45 Plank Road South Elementary School    110          25          School is outside the EPZ      2:15    12.3        25        2:40 Rochester Christian School            110          25          School is outside the EPZ      2:15    10.8        22        2:40 Schlegel Road Elementary School      110          25        7.1        10.3        42    3:00    13.4        27        3:25 Schroeder High School                110          25        2.3        9.5          15    2:30    13.4        27        3:00 Spry Middle School                    110          25        4.3        7.9          33    2:50    13.4        27        3:15 St Rita's School                      110          25          School is outside the EPZ      2:15    13.9        28        2:45 State Road Elementary School          110          25        5.7        9.2          38    2:55    13.4        27        3:20 Thomas High School                    110          25        1.9        9.5          13    2:30    13.4        27        2:55 Webster Christian School              110          25        4.0        7.9          31    2:50    13.5        27        3:15 Webster Montessori School            110          25        0.2        7.9          2    2:20    13.1        27        2:45 Willink Middle School                110          25        2.2        9.5          14    2:30    13.4        27        3:00 WAYNE COUNTY SCHOOLS Freewill Elementary School            47          25        3.7        31.0          8    1:20      8.4        17        1:40 Hop Skip & Jump Preschool            110          25        7.9        23.9        20    2:35      8.5        17        2:55 James A. Beneway High School          29          25        6.0        24.6        15    1:10      8.4        17        1:30 Lake Ontario Child Development        110          25        4.7        43.3          7    2:25    17.5        35        3:00 Magic Years Nursery School            110          25        6.7        37.0        11    2:30      7.7        16        2:45 Marion Central Middle/High School    110          25        2.4        36.2          5    2:20    14.0        28        2:50 Marion Elementary School              110          25          School is outside the EPZ      2:15    13.9        28        2:45 Ontario Elementary School              23          25        6.8        25.6        17    1:05      8.4        17        1:25 Ontario Primary School                18          25        7.1        27.3        16    1:00      8.4        17        1:20 Raggedy Ann & Andy Day Care          110          25        4.2        43.3          6    2:25    17.2        35        3:00 Rhyme Tyme Child Care Center          110          25        7.7        23.9        20    2:35      8.4        17        2:55 R.E. Ginna Nuclear Power Plant                                  825                                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                              Rev. 1
 
Travel            Dist.      Travel Dist. To          Time to              EPZ        Time Driver    Loading  EPZ    Average      EPZ            Bdry to    from EPZ      ETE to Mobilization  Time    Bdry    Speed      Bdry    ETE    R.C./R.L. Bdry to    R.C./R.L School          Time (min)    (min)  (mi)    (mph)      (min)  (hr:min)  (mi.)  H.S. (min)    (hr:min)
The Tot Spot Day Care Center        110        25      7.4      23.9        19      2:35      8.4        17        2:55 Thomas C. Armstrong Middle School    39        25      6.0      22.4        17      1:25      8.4        17        1:40 Wayne Education Center              110        25      3.4      36.9        6      2:25    17.5        35        3:00 Wayne Finger Lake BOCES              110        25      3.4      36.9        6      2:25    17.5        35        3:00 Wayne Technical & Career Center      110        25      3.4      36.9        6      2:25    17.5        35        3:00 Williamson Elementary School          23        25      6.3      36.9        11      1:00    14.1        29        1:30 Williamson Middle School              23        25      6.3      36.9        11      1:00    14.1        29        1:30 Williamson Senior High School        23        25      5.1      37.2        9      1:00    14.1        29        1:30 Maximum for EPZ:    3:00            Maximum:        3:25 Average for EPZ:  2:10              Average:      2:40 R.E. Ginna Nuclear Power Plant                              826                                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                        Rev. 1
 
Table 810. Summary of TransitDependent Bus Routes No. of                                                              Length Route          Buses                              Route Description                (mi.)
M1 Route A          2      Services half of ERPA M1                                  16.3 M1 Route B          3      Services half of ERPA M1                                  16.7 M2 Route C          1      Services ERPA M2                                          15.6 M3 Route D          1      Services ERPA M3                                          14.0 M4 Route E          3      Services half of the eastern portion of ERPA M4            12.5 M4 Route F          3      Services half of the eastern portion of ERPA M4            14.5 M4 Route G          3      Services the western portion of ERPA M4                    12.1 M5 Route H          2      Services the northern portion ERPA M5                      13.2 M5 Route I          2      Services the southern portion ERPA M5                      18.5 M6 Route J          2      Services the eastern portion of ERPA M6                    10.1 M6 Route K          2      Services the northern portion of ERPA M6                  13.4 M6 Route L          2      Services the southern portion of ERPA M6                    9.6 M7 Route M          5      Services the eastern portion of ERPA M7                    7.1 M7 Route N          5      Services the western portion of ERPA M8                    9.9 M8 Route P          1      Services the eastern portion of ERPA M8                    4.0 M8 Route Q          2      Services the western portion of ERPA M8                    4.4 M9 Route R          4      Services ERPA M9                                            7.1 W1 Route 1          2      Services the western portion of ERPA W1                    18.7 W1 Route 2          2      Services the central portion of ERPA W1                    16.2 W1 Route 3          2      Services the eastern portion of ERPA W1                    14.9 W2 Route 1          2      Services the southern portion of ERPA W2                  11.3 W2 Route 2          2      Services ERPA W2 along Route 104                          16.1 W2 Route 3          2      Services ERPA W2 along Ridge Road                          16.4 W3 Route 1          1      Services the western portion of ERPA W3                    15.9 W3 Route 2          1      Services the eastern portion of ERPA W3                    7.8 W4 Route 1          1      Services the southern portion of ERPA W4                    6.5 W4 Route 2          1      Services the northern portion of ERPA W4                  10.1 W5 Route 1          1      Services the northern portion of ERPA W5                    8.9 W5 Route 2          1      Services the southern portion of ERPA W5                    6.4 W5 Route 3          1      Services the central portion of ERPA W5                    7.0 W6 Route 1          1      Services the eastern portion of ERPA W6                    7.8 W6 Route 2          1      Services the central portion of ERPA W6                    6.5 W6 Route 3          1      Services the centralwestern portion of ERPA W6            10.0 W6 Route 4          1      Services the western portion of ERPA W6                    7.7 W7 Route 1          1      Services the western portion of ERPA W7                    13.3 W7 Route 2          1      Services the central portion of ERPA W7                    10.8 W7 Route 3          1      Services the eastern portion of ERPA W7                    9.9 Total:    69 R.E. Ginna Nuclear Power Plant                        827                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Table 811. TransitDependent Evacuation Time Estimates  Good Weather OneWave                                                        TwoWave Route                                Travel                  Route Route            Travel  Pickup            Distance  Time to          Driver  Travel    Pickup Route        Bus    Mobilization Length    Speed    Time    Time    ETE      to R. C. R. C. Unload  Rest    Time      Time      ETE Number      Number      (min)    (miles)    (mph)    (min)  (min)  (hr:min)  (miles)    (min)    (min) (min)    (min)    (min)  (hr:min)
M1 Route A      1          90        16.3      19.2    51      30      2:55      10.7        16        5    10      45        30      4:45 M1 Route A      2          110      16.3      27.1    36      30      3:00      10.7        16        5    10      45        30      4:50 M1 Route B      1          90        16.7      19.2    52      30      2:55      10.7        16        5    10      45        30      4:45 M1 Route B    2&3          110      16.7      25.1    40      30      3:00      10.7        16        5    10      45        30      4:50 M2 Route C      1          90        15.6      17.4    54      30      2:55      10.7        16        5    10      44        30      4:45 M3 Route D      1          90        14.0      15.1    56      30      3:00      10.7        16        5    10      42        30      4:45 M4 Route E      1          90        12.5      13.3    57      30      3:00      9.4        14        5    10      42        30      4:45 M4 Route E    2&3          110      12.5      18.6    40      30      3:05      9.4        14        5    10      42        30      4:50 M4 Route F      1          90        14.5      20.6    42      30      2:45      9.4        14        5    10      46        30      4:30 M4 Route F    2&3          110      14.5      21.4    41      30      3:05      9.4        14        5    10      45        30      4:50 M4 Route G      1          90        12.1      18.9    38      30      2:40      9.4        14        5    10      42        30      4:25 M4 Route G    2&3          110      12.1      17.8    41      30      3:05      9.4        14        5    10      41        30      4:45 M5 Route H      1          90      12.6      40.7    19      30      2:20      9.4        14        5    10      40        30      4:00 M5 Route H      2          90      12.6      40.7    19      30      2:20      9.4        14        5    10      40        30      4:00 M5 Route I      1          90        18.5      42.4    26      30      2:30      9.4        14        5    10      48        30      4:20 M5 Route I      2          90        18.5      42.4    26      30      2:30      10.7        16        5    10      50        30      4:25 M6 Route J      1          90      10.1      13.8    44      30      2:45      10.7        16        5    10      38        30      4:25 M6 Route J      2          90      10.1      13.8    44      30      2:45      10.7        16        5    10      38        30      4:25 M6 Route K      1          90        13.4      44.4    18      30      2:20      10.7        16        5    10      42        30      4:05 M6 Route K      2          90        13.4      44.4    18      30      2:20      10.7        16        5    10      42        30      4:05 M6 Route L      1          90        9.6      16.2    36      30      2:40      10.7        16        5    10      37        30      4:20 M6 Route L      2          90        9.6      16.2    36      30      2:40      10.7        16        5    10      37        30      4:20 M7 Route M      1          90        7.1      13.9    31      30      2:35      15.3        23        5    10      42        30      4:30 M7 Route M    2&3          100        7.1      14.6    29      30      2:40      15.3        23        5    10      42        30      4:30 M7 Route M    4&5          110        7.1      17.4    24      30      2:45      15.3        23        5    10      42        30      4:35 M7 Route N      1          90        9.9      20.0    30      30      2:30      15.3        23        5    10      45        30      4:25 M7 Route N    2&3          100        9.9      21.4    28      30      2:40      15.3        23        5    10      47        30      4:35 M7 Route N    4&5          110        9.9      23.7    25      30      2:50      15.3        23        5    10      47        30      4:45 M8 Route P      1          90        4.0      8.8    27      30      2:30      10.7        16        5    10      33        30      4:05 M8 Route Q      1          90        4.4      42.8      6      30      2:10      10.7        16        5    10      33        30      3:45 R.E. Ginna Nuclear Power Plant                                          828                                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                    Rev. 1
 
OneWave                                                    TwoWave Route                              Travel                Route Route          Travel Pickup            Distance Time to        Driver  Travel    Pickup Route        Bus    Mobilization Length  Speed    Time    Time    ETE    to R. C. R. C. Unload  Rest    Time      Time      ETE Number      Number      (min)    (miles) (mph)  (min)    (min)  (hr:min)  (miles)  (min)  (min) (min)    (min)    (min)  (hr:min)
M8 Route Q      2          110      4.4    41.6      6      30      2:30    10.7      16      5    10      34        30      4:10 M9 Route R    1&2          90        7.1    8.8    48      30      2:50    10.7      16      5    10      37        30      4:30 M9 Route R    3&4          110      7.1    17.4    24      30      2:45    10.7      16      5    10      35        30      4:25 W1 Route 1      1          90      18.7  39.6    28      30      2:30      8.2      12      5    10      48        30      4:15 W1 Route 1      2          90      18.7  39.6    28      30      2:30      8.2      12      5    10      44        30      4:15 W1 Route 2      1          90      16.2  36.1    27      30      2:30      8.4      13      5    10      46        30      4:15 W1 Route 2      2          110      16.2  38.5    25      30      2:50      8.4      13      5    10      41        30      4:30 W1 Route 3      1          90      14.9  35.8    25      30      2:25      7.7      12      5    10      40        30      4:05 W1 Route 3      2          110      14.9  36.7    24      30      2:45      7.7      12      5    10      41        30      4:25 W2 Route 1      1          90      11.3  45.4    15      30      2:15      8.4      13      5    10      37        30      3:50 W2 Route 1      2          110      11.3  46.0    15      30      2:35      8.4      13      5    10      39        30      4:15 W2 Route 2      1          90      16.1  33.9    28      30      2:30      8.4      13      5    10      45        30      4:15 W2 Route 2      2          110      16.1  36.8    26      30      2:50      8.4      13      5    10      45        30      4:35 W2 Route 3      1          90      16.4  47.0    21      30      2:25      7.7      12      5    10      41        30      4:05 W2 Route 3      2          110      16.4  47.3    21      30      2:45      7.7      12      5    10      42        30      4:25 W3 Route 1      1          90      15.9  40.9    23      30      2:25    17.5      26      5    10      58        30      4:35 W3 Route 2      1          90        7.8  49.4      9      30      2:10    20.6      31      5    10      50        30      4:20 W4 Route 1      1          90        6.5  26.4    15      30      2:15    17.2      26      5    10      44        30      4:10 W4 Route 2      1          90      10.1  22.0    28      30      2:30    17.2      26      5    10      48        30      4:30 W5 Route 1      1          90        8.9  36.7    15      30      2:15    17.2      26      5    10      46        30      4:15 W5 Route 2      1          90        6.4  46.8      8      30      2:10    14.5      22      5    10      40        30      4:00 W5 Route 3      1          90        7.0  50.4      8      30      2:10    14.5      22      5    10      40        30      4:00 W6 Route 1      1          90        7.8  49.4    10      30      2:10    14.5      22      5    10      41        30      4:00 W6 Route 2      1          90        6.5  46.0      8      30      2:10    14.1      21      5    10      39        30      4:00 W6 Route 3      1          90      10.0  45.0    13      30      2:15    14.1      21      5    10      43        30      4:05 W6 Route 4      1          90        7.7  43.8    11      30      2:15    14.2      21      5    10      41        30      4:05 W7 Route 1      1          90      13.3  32.5    25      30      2:25      8.4      13      5    10      38        30      4:05 W7 Route 2      1          90      10.8  43.2    15      30      2:15      8.4      13      5    10      35        30      3:50 W7 Route 3      1          90        9.9  45.7    13      30      2:15      8.4      13      5    10      34        30      3:50 Maximum ETE:    3:05                                      Maximum ETE:      4:50 Average ETE:  2:35                                        Average ETE:    4:20 R.E. Ginna Nuclear Power Plant                                        829                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                            Rev. 1
 
Table 812. TransitDependent Evacuation Time Estimates  Rain OneWave                                                              TwoWave Route                                Travel                    Route Route              Travel  Pickup            Distance  Time to          Driver    Travel    Pickup Route        Bus    Mobilization Length    Speed    Time    Time    ETE    to R. C. R. C. Unload  Rest      Time      Time      ETE Number      Number      (min)    (miles)    (mph)    (min)  (min) (hr:min)    (miles)    (min)      (min) (min)    (min)      (min)    (hr:min)
M1 Route A        1        100        16.3      16.1      61      40      3:25      10.7        18        5    10        50        40        5:30 M1 Route A        2        120        16.3      20.4      48      40      3:30      10.7        18        5    10        50        40        5:35 M1 Route B        1        100        16.7      15.6      64      40      3:25      10.7        18        5    10        50        40        5:30 M1 Route B      2&3        120        16.7      20.8      48      40      3:30      10.7        18        5    10        50        40        5:35 M2 Route C        1        100        15.6      14.8      63      40      3:25      10.7        18        5    10        49        40        5:30 M3 Route D        1        100        14.0      12.3      68      40      3:30      10.7        18        5    10        47        40        5:35 M4 Route E        1        100        12.5      13.2      57      40      3:20      9.4        16        5    10        47        40        5:20 M4 Route E      2&3        120        12.5      16.7      45      40      3:25      9.4        16        5    10        47        40        5:25 M4 Route F        1        100        14.5      24.6      35      40      3:00      9.4        16        5    10        50        40        5:05 M4 Route F      2&3        120        14.5      26.2      33      40      3:15      9.4        16        5    10        50        40        5:20 M4 Route G        1        100        12.1      24.0      30      40      2:55      9.4        16        5    10        46        40        4:55 M4 Route G      2&3        120        12.1      24.7      29      40      3:10      9.4        16        5    10        46        40        5:10 M5 Route H        1        100        12.6      36.4      21      40      2:45      9.4        16        5    10        45        40        4:45 M5 Route H        2        100        12.6      36.4      21      40      2:45      9.4        16        5    10        45        40        4:45 M5 Route I        1        100        18.5      38.5      29      40      2:50      9.4        16        5    10        52        40        4:55 M5 Route I        2        100        18.5      38.5      29      40      2:50      10.7        18        5    10        55        40        5:00 M6 Route J        1        100        10.1      12.5      48      40      3:10      10.7        18        5    10        42        40        5:10 M6 Route J        2        100        10.1      12.5      48      40      3:10      10.7        18        5    10        42        40        5:10 M6 Route K        1        100        13.4      39.7      20      40      2:45      10.7        18        5    10        53        40        4:55 M6 Route K        2        100        13.4      39.7      20      40      2:45      10.7        18        5    10        53        40        4:55 M6 Route L        1        100        9.6      15.0      38      40      3:00      10.7        18        5    10        42        40        5:00 M6 Route L        2        100        9.6      15.0      38      40      3:00      10.7        18        5    10        42        40        5:00 M7 Route M        1        100        7.1      11.8      36      40      3:00      15.3        26        5    10        47        40        5:10 M7 Route M      2&3        110        7.1      13.0      33      40      3:05      15.3        26        5    10        47        40        5:15 M7 Route M      4&5        120        7.1      15.5      27      40      3:10      15.3        26        5    10        47        40        5:20 M7 Route N        1        100        9.9      14.1      42      40      3:05      15.3        26        5    10        54        40        5:25 M7 Route N      2&3        110        9.9      15.2      39      40      3:10      15.3        26        5    10        54        40        5:30 M7 Route N      4&5        120        9.9      17.2      35      40      3:15      15.3        26        5    10        54        40        5:35 M8 Route P        1        100        4.0      9.6      25      40      2:45      10.7        18        5    10        35        40        4:35 M8 Route Q        1        100        4.4      38.5      7      40      2:30      10.7        18        5    10        42        40        4:30 R.E. Ginna Nuclear Power Plant                                          830                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                        Rev. 1
 
OneWave                                                      TwoWave Route                            Travel                  Route Route          Travel Pickup            Distance Time to        Driver    Travel    Pickup Route        Bus    Mobilization Length  Speed    Time    Time    ETE    to R. C. R. C. Unload  Rest      Time      Time      ETE Number      Number      (min)    (miles) (mph)    (min)  (min)  (hr:min)  (miles)  (min)  (min) (min)    (min)      (min)    (hr:min)
M8 Route Q        2        120        4.4  38.6      7      40      2:50    10.7      18      5    10        41        40        4:45 M9 Route R      1&2        100        7.1    9.6      44      40      3:05    10.7      18      5    10        39        40        5:00 M9 Route R      3&4        120        7.1    20.1    21      40      3:05    10.7      18      5    10        39        40        5:00 W1 Route 1        1        100        18.7  32.5    34      40      2:55      8.2      14      5    10        49        40        4:55 W1 Route 1        2        100        18.7  32.5    34      40      2:55      8.2      14      5    10        49        40        4:55 W1 Route 2        1        100        16.2  29.2    33      40      2:55      8.4      14      5    10        47        40        4:55 W1 Route 2        2        120        16.2  41.7    23      40      3:05      8.4      14      5    10        46        40        5:05 W1 Route 3        1        100        14.9  28.4    31      40      2:55      7.7      13      5    10        44        40        4:50 W1 Route 3        2        120        14.9  40.9    22      40      3:05      7.7      13      5    10        44        40        5:00 W2 Route 1        1        100        11.3  41.8    16      40      2:40      8.4      14      5    10        44        40        4:35 W2 Route 1        2        120        11.3  42.9    16      40      3:00      8.4      14      5    10        43        40        4:55 W2 Route 2        1        100        16.1  27.9    35      40      2:55      8.4      14      5    10        47        40        4:55 W2 Route 2        2        120        16.1  42.2    23      40      3:05      8.4      14      5    10        46        40        5:05 W2 Route 3        1        100        16.4  43.3    23      40      2:45      7.7      13      5    10        49        40        4:45 W2 Route 3        2        120        16.4  42.9    23      40      3:05      7.7      13      5    10        48        40        5:05 W3 Route 1        1        100        15.9  39.7    24      40      2:45    17.5      30      5    10        61        40        5:15 W3 Route 2        1        100        7.8  44.6    11      40      2:35    20.6      35      5    10        58        40        5:05 W4 Route 1        1        100        6.5  27.6    14      40      2:35    17.2      29      5    10        49        40        4:50 W4 Route 2        1        100        10.1  21.1    29      40      2:50    17.2      29      5    10        56        40        5:15 W5 Route 1        1        100        8.9  37.3    14      40      2:35    17.2      29      5    10        52        40        4:55 W5 Route 2        1        100        6.4  42.4      9      40      2:30    14.5      25      5    10        46        40        4:40 W5 Route 3        1        100        7.0  45.8      9      40      2:30    14.5      25      5    10        46        40        4:40 W6 Route 1        1        100        7.8  44.2    11      40      2:35    14.5      25      5    10        47        40        4:45 W6 Route 2        1        100        6.5  42.9      9      40      2:30    14.1      24      5    10        46        40        4:40 W6 Route 3        1        100        10.0  40.2    15      40      2:35    14.1      24      5    10        50        40        4:45 W6 Route 4        1        100        7.7  40.1    11      40      2:35    14.2      24      5    10        49        40        4:45 W7 Route 1        1        100        13.3  31.6    25      40      2:50      8.4      14      5    10        43        40        4:45 W7 Route 2        1        100        10.8  38.5    17      40      2:40      8.4      14      5    10        41        40        4:35 W7 Route 3        1        100        9.9  42.0    14      40      2:35      8.4      14      5    10        44        40        4:30 Maximum ETE:    3:30                                          Maximum ETE:      5:35 Average ETE:  3:00                                            Average ETE:    5:00 R.E. Ginna Nuclear Power Plant                                        831                                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                Rev. 1
 
Table 813. Transit Dependent Evacuation Time Estimates  Snow OneWave                                                              TwoWave Route                                Travel                    Route Route              Travel  Pickup          Distance    Time to          Driver    Travel    Pickup Route        Bus    Mobilization Length    Speed      Time    Time    ETE    to R. C. R. C. Unload  Rest      Time      Time        ETE Number      Number      (min)    (miles)    (mph)    (min)    (min) (hr:min)  (miles)    (min)    (min) (min)      (min)      (min)    (hr:min)
M1 Route A      1          110        16.3      14.5      67      50    3:50      10.7        21        5    10        57        50        6:15 M1 Route A      2          130        16.3      18.6      52      50    3:55      10.7        21        5    10        57        50        6:20 M1 Route B      1          110        16.7      14.9      67      50    3:50      10.7        21        5    10        58        50        6:15 M1 Route B    2&3          130        16.7      19.0      53      50    3:55      10.7        21        5    10        58        50        6:20 M2 Route C      1          110        15.6      13.9      67      50    3:50      10.7        21        5    10        56        50        6:15 M3 Route D      1          110        14.0      12.0      70      50    3:50      10.7        21        5    10        54        50        6:15 M4 Route E      1          110        12.5      13.1      57      50    3:40      9.4        19        5    10        53        50        6:00 M4 Route E    2&3          130        12.5      17.3      43      50    3:45      9.4        19        5    10        53        50        6:05 M4 Route F      1          110        14.5      22.9      38      50    3:20      9.4        19        5    10        57        50        5:45 M4 Route F    2&3          130        14.5      23.4      37      50    3:40      9.4        19        5    10        57        50        6:05 M4 Route G      1          110        12.1      20.8      35      50    3:15      9.4        19        5    10        53        50        5:35 M4 Route G    2&3          130        12.1      20.6      35      50    3:40      9.4        19        5    10        52        50        6:00 M5 Route H      1          110        12.6      33.0      23      50    3:05      9.4        19        5    10        52        50        5:25 M5 Route H      2          110        12.6      33.0      23      50    3:05      9.4        19        5    10        52        50        5:25 M5 Route I      1          110        18.5      34.8      32      50    3:15      9.4        19        5    10        60        50        5:40 M5 Route I      2          110        18.5      34.8      32      50    3:15      10.7        21        5    10        62        50        5:45 M6 Route J      1          110        10.1      10.3      59      50    3:40      10.7        21        5    10        50        50        6:00 M6 Route J      2          110        10.1      10.3      59      50    3:40      10.7        21        5    10        49        50        6:00 M6 Route K      1          110        13.4      35.2      23      50    3:05      10.7        21        5    10        61        50        5:35 M6 Route K      2          110        13.4      35.2      23      50    3:05      10.7        21        5    10        61        50        5:35 M6 Route L      1          110        9.6      12.9      45      50    3:25      10.7        21        5    10        48        50        5:40 M6 Route L      2          110        9.6      12.9      45      50    3:25      10.7        21        5    10        48        50        5:40 M7 Route M      1          110        7.1      9.7      44      50    3:25      15.3        31        5    10        54        50        5:55 M7 Route M    2&3          120        7.1      10.6      40      50    3:35      15.3        31        5    10        54        50        6:05 M7 Route M    4&5          130        7.1      12.1      35      50    3:40      15.3        31        5    10        54        50        6:10 M7 Route N      1          110        9.9      13.1      45      50    3:30      15.3        31        5    10        58        50        6:05 M7 Route N    2&3          120        9.9      14.6      41      50    3:35      15.3        31        5    10        62        50        6:15 M7 Route N    4&5          130        9.9      15.8      38      50    3:40      15.3        31        5    10        62        50        6:20 M8 Route P      1          110        4.0      6.0      40      50    3:20      10.7        21        5    10        44        50        5:30 M8 Route Q      1          110        4.4      33.7        8      50    2:50      10.7        21        5    10        48        50        5:05 M8 Route Q      2          130        4.4      34.0        8      50    3:10      10.7        21        5    10        47        50        5:25 R.E. Ginna Nuclear Power Plant                                          832                                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                    Rev. 1
 
OneWave                                                      TwoWave Route                              Travel                  Route Route          Travel Pickup            Distance Time to        Driver    Travel    Pickup Route        Bus    Mobilization Length  Speed    Time    Time      ETE  to R. C. R. C. Unload  Rest      Time      Time        ETE Number      Number      (min)    (miles)  (mph)  (min)    (min)  (hr:min)  (miles)  (min)  (min) (min)      (min)      (min)    (hr:min)
M9 Route R    1&2          110        7.1      9.2    46      50      3:30    10.7      21      5    10        51        50        5:50 M9 Route R    3&4          130        7.1    16.9    25      50      3:30    10.7      21      5    10        45        50        5:45 W1 Route 1      1          110        18.7    26.4    43      50      3:25      8.2      16      5    10        56        50        5:45 W1 Route 1      2          110        18.7    26.4    43      50      3:25      8.2      16      5    10        56        50        5:45 W1 Route 2      1          110        16.2    22.1    44      50      3:25      8.4      17      5    10        53        50        5:40 W1 Route 2      2          130        16.2    29.5    33      50      3:35      8.4      17      5    10        53        50        5:50 W1 Route 3      1          110        14.9    21.5    41      50      3:25      7.7      15      5    10        50        50        5:35 W1 Route 3      2          130        14.9    27.2    33      50      3:35      7.7      15      5    10        50        50        5:50 W2 Route 1      1          110        11.3    37.0    18      50      3:00      8.4      17      5    10        53        50        5:15 W2 Route 1      2          130        11.3    37.6    18      50      3:20      8.4      17      5    10        53        50        5:35 W2 Route 2      1          110        16.1    21.7    45      50      3:25      8.4      17      5    10        53        50        5:40 W2 Route 2      2          130        16.1    28.2    34      50      3:35      8.4      17      5    10        52        50        5:50 W2 Route 3      1          110        16.4    38.0    26      50      3:10      7.7      15      5    10        51        50        5:25 W2 Route 3      2          130        16.4    36.9    27      50      3:30      7.7      15      5    10        55        50        5:50 W3 Route 1      1          110        15.9    34.6    27      50      3:10    17.5      35      5    10        70        50        6:05 W3 Route 2      1          110        7.8    39.5    12      50      2:55    20.6      41      5    10        65        50        5:50 W4 Route 1      1          110        6.5    23.2    17      50      3:00    17.2      34      5    10        57        50        5:40 W4 Route 2      1          110        10.1    24.3    25      50      3:05    17.2      34      5    10        65        50        5:50 W5 Route 1      1          110        8.9    29.9    18      50      3:00    17.2      34      5    10        63        50        5:45 W5 Route 2      1          110        6.4    37.6    10      50      2:55    14.5      29      5    10        53        50        5:25 W5 Route 3      1          110        7.0    39.1    11      50      2:55    14.5      29      5    10        53        50        5:25 W6 Route 1      1          110        7.8    39.5    12      50      2:55    14.5      29      5    10        55        50        5:25 W6 Route 2      1          110        6.5    37.3    10      50      2:55    14.1      28      5    10        53        50        5:25 W6 Route 3      1          110        10.0    36.0    17      50      3:00    14.1      28      5    10        57        50        5:35 W6 Route 4      1          110        7.7    35.6    13      50      2:55    14.2      28      5    10        54        50        5:25 W7 Route 1      1          110        13.3    27.4    29      50      3:10      8.4      17      5    10        50        50        5:25 W7 Route 2      1          110        10.8    34.5    19      50      3:00      8.4      17      5    10        51        50        5:15 W7 Route 3      1          110        9.9    36.9    16      50      3:00      8.4      17      5    10        49        50        5:15 Maximum ETE:    3:55                                          Maximum ETE:      6:20 Average ETE:  3:25                                            Average ETE:    5:45 R.E. Ginna Nuclear Power Plant                                      833                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                            Rev. 1
 
Table 814. Special Facility Evacuation Time Estimates  Good Weather Travel Loading                                            Time to Rate                  Total                      EPZ Mobilization      (min per                Loading    Dist. To EPZ  Boundary      ETE Medical Facility        Patient            (min)          person)    People  Time (min)    Bdry (mi)      (min)      (hr:min)
Ambulatory                90                1          10          10          4.0          30        2:10 Maplewood Wheelchair bound          90                5          63          75          4.0          5          2:50 Nursing Home Bedridden                  90              15          0          0            4.0          30        2:00 Ambulatory                90                1        206          30          2.4          10        2:10 Cherry Ridge      Wheelchair bound          90                5          64          75          2.4          3          2:50 Bedridden                  90              15          3          30          2.4          10        2:10 Ambulatory                90                1          45          30          3.5          13        2:15 AHEPA 67          Wheelchair bound          90                5          5          25          3.5          15        2:10 Bedridden                  90              15          0          0            3.5          18        1:50 Ambulatory                90                1          45          30          2.8          10        2:10 Quinby Park Wheelchair bound          90                5          4          20          2.8          14        2:05 Apartments Bedridden                  90              15          0          0            2.8          13        1:45 Ontario          Ambulatory                90                1          7          7            9.3          12        1:50 Community        Wheelchair bound          90                5          3          15          9.3          11        2:00 Residence        Bedridden                  90              15          0          0            9.3          15        1:45 Ambulatory                90                1          1          1            8.5          13        1:45 Pines of Peace Wheelchair bound          90                5          1          5            8.5          13        1:50 Hospice Center Bedridden                  90              15          0          0            8.5          14        1:45 Williamson        Ambulatory                90                1          5          5            4.7          9          1:45 Community        Wheelchair bound          90                5          2          10          4.7          8          1:50 Residence        Bedridden                  90              15          0          0            4.7          10        1:40 Wayne ARC Day    Ambulatory                90                1          19          19          3.9          5          1:55 Activity Training Wheelchair bound          90                5          9          45          3.9          5          2:20 Program          Bedridden                  90              15          0          0            3.9          5          1:35 Maximum ETE:      2:50 Average ETE:    2:05 R.E. Ginna Nuclear Power Plant                                              834                                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                        Rev. 1
 
Table 815. Special Facility Evacuation Time Estimates  Rain Travel Loading                                              Time to Rate                    Total                        EPZ Mobilization      (min per                  Loading    Dist. To EPZ  Boundary      ETE Medical Facility        Patient          (min)          person)      People    Time (min)      Bdry (mi)      (min)    (hr:min)
Ambulatory              100              1          10          10            4.0          32        2:25 Maplewood Wheelchair bound        100              5          63          75            4.0          5        3:00 Nursing Home Bedridden                100              15          0          0            4.0          36        2:20 Ambulatory              100              1          206        30            2.4          14        2:25 Cherry Ridge      Wheelchair bound        100              5          64          75            2.4          3        3:00 Bedridden                100              15          3          30            2.4          14        2:25 Ambulatory              100              1          45          30            3.5          15        2:25 AHEPA 67          Wheelchair bound        100              5          5          25            3.5          16        2:25 Bedridden                100              15          0          0            3.5          23        2:05 Ambulatory              100              1          45          30            2.8          12        2:25 Quinby Park Wheelchair bound        100              5          4          20            2.8          15        2:15 Apartments Bedridden                100              15          0          0            2.8          17        2:00 Ontario            Ambulatory              100              1          7          7            9.3          13        2:00 Community          Wheelchair bound        100              5          3          15            9.3          12        2:10 Residence          Bedridden                100              15          0          0            9.3          15        1:55 Ambulatory              100              1          1          1            8.5          13        1:55 Pines of Peace Wheelchair bound        100              5          1          5            8.5          13        2:00 Hospice Center Bedridden                100              15          0          0            8.5          14        1:55 Williamson        Ambulatory              100              1          5          5            4.7          9        1:55 Community          Wheelchair bound        100              5          2          10            4.7          8        2:00 Residence          Bedridden                100              15          0          0            4.7          10        1:50 Wayne ARC Day      Ambulatory              100              1          19          19            3.9          5        2:05 Activity Training  Wheelchair bound        100              5          9          45            3.9          5        2:30 Program            Bedridden                100              15          0          0            3.9          5        1:45 Maximum ETE:    3:00 Average ETE:    2:15 R.E. Ginna Nuclear Power Plant                                              835                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                          Rev. 1
 
Table 816. Special Facility Evacuation Time Estimates  Snow Travel Loading                                              Time to Rate                    Total                        EPZ Mobilization    (min per                  Loading    Dist. To EPZ  Boundary      ETE Medical Facility        Patient          (min)        person)      People    Time (min)    Bdry (mi)      (min)    (hr:min)
Ambulatory              110              1          10          10            4.0          38        2:40 Maplewood Wheelchair bound        110              5          63          75            4.0          6        3:15 Nursing Home Bedridden                110              15          0          0            4.0          39        2:30 Ambulatory              110              1          206        30            2.4          17        2:40 Cherry Ridge      Wheelchair bound        110              5          64          75            2.4          4        3:10 Bedridden                110              15          3          30            2.4          17        2:40 Ambulatory              110              1          45          30            3.5          19        2:40 AHEPA 67          Wheelchair bound        110              5          5          25            3.5          22        2:40 Bedridden                110              15          0          0            3.5          26        2:20 Ambulatory              110              1          45          30            2.8          16        2:40 Quinby Park Wheelchair bound        110              5          4          20            2.8          19        2:30 Apartments Bedridden                110              15          0          0            2.8          20        2:10 Ontario            Ambulatory              110              1          7          7            9.3          15        2:15 Community          Wheelchair bound        110              5          3          15            9.3          14        2:20 Residence          Bedridden                110              15          0          0            9.3          18        2:10 Ambulatory              110              1          1          1            8.5          15        2:10 Pines of Peace Wheelchair bound        110              5          1          5            8.5          15        2:10 Hospice Center Bedridden                110              15          0          0            8.5          17        2:10 Williamson        Ambulatory              110              1          5          5            4.7          10        2:05 Community          Wheelchair bound        110              5          2          10            4.7          10        2:10 Residence          Bedridden                110              15          0          0            4.7          12        2:05 Wayne ARC Day      Ambulatory              110              1          19          19            3.9          6        2:15 Activity Training  Wheelchair bound        110              5          9          45            3.9          6        2:45 Program            Bedridden                110              15          0          0            3.9          6        2:00 Maximum ETE:      3:15 Average ETE:    2:30 R.E. Ginna Nuclear Power Plant                                            836                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                        Rev. 1
 
Table 817. Homebound Special Needs Population Evacuation Time Estimates Total        Travel Mobiliza  Loading                    Loading      Time to People                                              tion    Time at    Travel to      Time at        EPZ Requiring  Vehicles                  Weather      Time      1st Stop  Subsequent  Subsequent    Boundary        ETE Vehicle Type    Vehicle  deployed        Stops    Conditions    (min)      (min)    Stops (min)  Stops (min)    (min)      (hr:min)
Normal          90                      27                        11          2:30 Vans          113        29              4      Rain            100          5          30          15            14          2:45 Snow            110                      33                        16          3:00 Normal          90                      18                        11          2:15 Wheelchair 47        16              3      Rain            100          5          20          10            14          2:30 Vans Snow            110                      22                        16          2:45 Normal          90                      10                        11          2:25 Ambulances        62        31              2      Rain            100        15          11          15            14          2:35 Snow            110                      13                        16          2:50 Maximum ETE:        3:00 Average ETE:      2:40 R.E. Ginna Nuclear Power Plant                                        837                                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                      Rev. 1
 
9    TRAFFIC MANAGEMENT STRATEGY This section discusses the suggested traffic control and management strategy that is designed to expedite the movement of evacuating traffic. The resources required to implement this strategy include:
* Personnel with the capabilities of performing the planned control functions of traffic guides (preferably, not necessarily, law enforcement officers).
* Traffic Control Devices to assist these personnel in the performance of their tasks. These devices should comply with the guidance of the Manual of Uniform Traffic Control Devices (MUTCD) published by the Federal Highway Administration (FHWA) of the U.S.D.O.T. All state and most county transportation agencies have access to the MUTCD, which is available online: http://mutcd.fhwa.dot.gov which provides access to the official PDF version.
* A plan that defines all locations, provides necessary details and is documented in a format that is readily understood by those assigned to perform traffic control.
The functions to be performed in the field are:
: 1. Facilitate evacuating traffic movements that safely expedite travel out of the EPZ.
: 2. Discourage traffic movements that move evacuating vehicles in a direction which takes them significantly closer to the power plant, or which interferes with the efficient flow of other evacuees.
The terms "facilitate" and "discourage" rather than "enforce" and "prohibit" are employed to indicate the need for flexibility in performing the traffic control function. There are always legitimate reasons for a driver to prefer a direction other than that indicated. For example:
* A driver may be traveling home from work or from another location, to join other family members prior to evacuating.
* An evacuating driver may be travelling to pick up a relative, or other evacuees.
* The driver may be an emergency worker en route to perform an important activity.
The implementation of a plan must also be flexible enough for the application of sound judgment by the traffic guide.
The traffic management plan is the outcome of the following process:
: 1. The existing TCPs and ACPs identified by the offsite agencies in their existing emergency plans serve as the basis of the traffic management plan, as per NUREG/CR7002.
: 2. Computer analysis of the evacuation traffic flow environment.
This analysis identifies the best routing and those critical intersections that experience pronounced congestion. Any critical intersections that are not identified in the existing offsite plans are suggested as additional TCPs and ACPs
: 3. A field survey of the highway network within 15 miles of the power plant. The schematics describing traffic and access control at suggested additional TCPs and ACPs, which are presented in Appendix G, are based on data collected during field surveys, R.E. Ginna Nuclear Power Plant                      91                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
upon large scale maps, and on overhead photos.
: 4. Consultation with emergency management and law enforcement personnel.
Trained personnel who are experienced in controlling traffic and are aware of the likely evacuation traffic patterns should review the control tactics at the suggested additional TCPs and ACPs.
: 5. Prioritization of TCPs and ACPs.
Application of traffic and access control at some TCPs and ACPs will have a more pronounced influence on expediting traffic movements than at other TCPs and ACPs. For example, TCPs controlling traffic originating from areas in close proximity to the power plant could have a more beneficial effect on minimizing potential exposure to radioactivity than those TCPs located far from the power plant. These priorities should be assigned by state/county emergency management representatives and by law enforcement personnel.
It is recommended that the control tactics identified in the schematics in Appendix G be reviewed by the state and county emergency planners, and local and state police. Specifically the number and locations of the suggested TCPs should be reviewed in detail, and the indicated resource requirements should be reconciled with current assets and consideration be given to incorporating them into the county Radiological Emergency Preparedness Plans.
The use of Intelligent Transportation Systems (ITS) technologies can reduce manpower and equipment needs, while still facilitating the evacuation process. Dynamic Message Signs (DMS) can be placed within the EPZ to provide information to travelers regarding traffic conditions, route selection, and reception center information. DMS can also be placed outside of the EPZ to warn motorists to avoid using routes that may conflict with the flow of evacuees away from the power plant. Highway Advisory Radio (HAR) can be used to broadcast information to evacuees en route through their vehicle stereo systems. Automated Traveler Information Systems (ATIS) can also be used to provide evacuees with information. Internet websites can provide traffic and evacuation route information before the evacuee begins their trip, while on board navigation systems (GPS units), cell phones, and pagers can be used to provide information en route. These are only several examples of how ITS technologies can benefit the evacuation process. Consideration should be given that ITS technologies be used to facilitate the evacuation process, and any additional signage placed should consider evacuation needs.
The ETE analysis treated all controlled intersections that are existing TCP locations in the offsite agency plans as being controlled by actuated signals.
Chapters 2N and 5G, and Part 6 of the 2009 MUTCD are particularly relevant and should be reviewed during emergency response training.
The ETE calculations reflect the assumption that all externalexternal trips are interdicted and diverted after 2 hours have elapsed from the ATE.
All transit vehicles and other responders entering the EPZ to support the evacuation are assumed to be unhindered by personnel manning ACPs and TCPs.
R.E. Ginna Nuclear Power Plant                    92                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Study Assumptions 5 and 6 in Section 2.3 discuss ACP and TCP staffing schedules and operations.
R.E. Ginna Nuclear Power Plant          93                        KLD Engineering, P.C.
Evacuation Time Estimate                                                          Rev. 1
 
10 EVACUATION ROUTES Evacuation routes are comprised of two distinct components:
* Routing from an ERPA being evacuated to the boundary of the Evacuation Region and thence out of the EPZ.
* Routing of transitdependent evacuees from the EPZ boundary to reception centers.
Evacuees will select routes within the EPZ in such a way as to minimize their exposure to risk.
This expectation is met by the DYNEV II model routing traffic away from the location of the plant, to the extent practicable. The DTRAD model satisfies this behavior by routing traffic so as to balance traffic demand relative to the available highway capacity to the extent possible.
See Appendices B through D for further discussion.
The routing of transitdependent evacuees from the EPZ boundary to reception centers is designed to minimize the amount of travel outside the EPZ, from the points where these routes cross the EPZ boundary.
Figure 101 present a map showing the general population and school reception centers for evacuees. The major evacuation routes for the EPZ are presented in Figure 102.
It is assumed that all school evacuees will be taken to the appropriate school receiving locations and subsequently picked up by parents or guardians. Transitdependent evacuees are transported to the nearest reception center for each county. This study does not consider the transport of evacuees from reception centers to congregate care centers, if the counties do make the decision to relocate evacuees.
R.E. Ginna Nuclear Power Plant                  101                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure 101. General Population Reception Centers and School Receiving Locations R.E. Ginna Nuclear Power Plant                                      102                                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                      Rev. 1
 
Figure 102. Evacuation Route Map R.E. Ginna Nuclear Power Plant                103              KLD Engineering, P.C.
Evacuation Time Estimate                                                      Rev. 1
 
11 SURVEILLANCE OF EVACUATION OPERATIONS There is a need for surveillance of traffic operations during the evacuation. There is also a need to clear any blockage of roadways arising from accidents or vehicle disablement. Surveillance can take several forms.
: 1. Traffic control personnel, located at Traffic Control and Access Control points, provide fixedpoint surveillance.
: 2. Ground patrols may be undertaken along welldefined paths to ensure coverage of those highways that serve as major evacuation routes.
: 3. Aerial surveillance of evacuation operations may also be conducted using helicopter or fixedwing aircraft, if available.
: 4. Cellular phone calls (if cellular coverage exists) from motorists may also provide direct field reports of road blockages.
These concurrent surveillance procedures are designed to provide coverage of the entire EPZ as well as the area around its periphery. It is the responsibility of the counties to support an emergency response system that can receive messages from the field and be in a position to respond to any reported problems in a timely manner. This coverage should quickly identify, and expedite the response to any blockage caused by a disabled vehicle.
Tow Vehicles In a lowspeed traffic environment, any vehicle disablement is likely to arise due to a lowspeed collision, mechanical failure or the exhaustion of its fuel supply. In any case, the disabled vehicle can be pushed onto the shoulder, thereby restoring traffic flow. Past experience in other emergencies indicates that evacuees who are leaving an area often perform activities such as pushing a disabled vehicle to the side of the road without prompting.
While the need for tow vehicles is expected to be low under the circumstances described above, it is still prudent to be prepared for such a need. Consideration should be given that tow trucks with a supply of gasoline be deployed at strategic locations within, or just outside, the EPZ. These locations should be selected so that:
They permit access to key, heavily loaded, evacuation routes.
Responding tow trucks would most likely travel counterflow relative to evacuating traffic.
Consideration should also be given that the state and local emergency management agencies encourage gas stations to remain open during the evacuation.
R.E. Ginna Nuclear Power Plant                  111                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
12 CONFIRMATION TIME It is necessary to confirm that the evacuation process is effective in the sense that the public is complying with the Advisory to Evacuate. The Counties have developed procedures to confirm evacuation. To assist the confirmation process, the Ginna Emergency Planning Calendar contains a Notification Sign that the members of the household are instructed to place in a window visible from the street, so law enforcement personnel will know that they have left home.1 Detailed below is a complementary approach for confirming evacuation, which could be utilized as needed.
The suggested procedure employs a stratified random sample and a telephone survey. The size of the sample is dependent on the expected number of households that do not comply with the Advisory to Evacuate. It is reasonable to assume, for the purpose of estimating sample size that at least 80 percent of the population within the EPZ will comply with the Advisory to Evacuate.
On this basis, an analysis could be undertaken (see Table 121) to yield an estimated sample size of approximately 300.
The confirmation process should start at about 2 hours and 15 minutes after the Advisory to Evacuate, which is when approximately 90 percent of evacuees have completed their mobilization activities (see Table 59). At this time, virtually all evacuees will have departed on their respective trips and the local telephone system will be largely free of traffic.
As indicated in Table 121, approximately 71/2 person hours are needed to complete the telephone survey. If six people are assigned to this task, each dialing a different set of telephone exchanges (e.g., each person can be assigned a different set of ERPAs), then the confirmation process will extend over a timeframe of about 75 minutes. Thus, the confirmation should be completed before the evacuated area is cleared. Of course, fewer people would be needed for this survey if the Evacuation Region were only a portion of the EPZ. Use of modern automated computer controlled dialing equipment or other technologies (e.g., reverse 911 or equivalent) can significantly reduce the manpower requirements and the time required to undertake this type of confirmation survey.
If this method is indeed used by the offsite agencies, consideration should be given to maintain a list of telephone numbers within the EPZ in the EOC at all times. Such a list could be purchased from vendors and could be periodically updated. As indicated above, the confirmation process should not begin until 2 hours and 15 minutes after the Advisory to Evacuate, to ensure that households have had enough time to mobilize. This 2 hours and 15 minutes timeframe will enable telephone operators to arrive at their workplace, obtain a call list and prepare to make the necessary phone calls.
Should the number of telephone responses (i.e., people still at home) exceed 20 percent, then the telephone survey should be repeated after an hour's interval until the confirmation process is completed.
1 Wayne County REP Plan Rev 16, Appendix A Evacuation Plan 2011 R.E. Ginna Nuclear Power Plant                  121                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
Table 121. Estimated Number of Telephone Calls Required for Confirmation of Evacuation Problem Definition Estimate number of phone calls, n, needed to ascertain the proportion, F of households that have not evacuated.
 
==Reference:==
Burstein, H., Attribute Sampling, McGraw Hill, 1971 Given:
No. of households plus other facilities, N, within the EPZ (est.) = 25,100 Est. proportion, F, of households that will not evacuate = 0.20 Allowable error margin, e: 0.05 Confidence level, : 0.95 (implies A = 1.96)
Applying Table 10 of cited reference, 0.25;        1          0.75 308 Finite population correction:
304 1
Thus, some 300 telephone calls will confirm that approximately 20 percent of the population has not evacuated. If only 10 percent of the population does not comply with the Advisory to Evacuate, then the required sample size, nF = 215.
Est. Person Hours to complete 300 telephone calls Assume:
Time to dial using touch tone (random selection of listed numbers): 30 seconds Time for 6 rings (no answer): 36 seconds Time for 4 rings plus short conversation: 60 sec.
Interval between calls: 20 sec.
Person Hours:
300 30    0.8 36      0.2 60      20 7.6 3600 R.E. Ginna Nuclear Power Plant                    122                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
APPENDIX A Glossary of Traffic Engineering Terms
 
A. GLOSSARY OF TRAFFIC ENGINEERING TERMS Table A1. Glossary of Traffic Engineering Terms Term                              Definition Analysis Network                  A graphical representation of the geometric topology of a physical roadway system, which is comprised of directional links and nodes.
Link                              A network link represents a specific, onedirectional section of roadway. A link has both physical (length, number of lanes, topology, etc.) and operational (turn movement percentages, service rate, freeflow speed) characteristics.
Measures of Effectiveness          Statistics describing traffic operations on a roadway network.
Node                              A network node generally represents an intersection of network links. A node has control characteristics, i.e., the allocation of service time to each approach link.
Origin                            A location attached to a network link, within the EPZ or Shadow Region, where trips are generated at a specified rate in vehicles per hour (vph). These trips enter the roadway system to travel to their respective destinations.
Prevailing Roadway and            Relates to the physical features of the roadway, the nature (e.g.,
Traffic Conditions                composition) of traffic on the roadway and the ambient conditions (weather, visibility, pavement conditions, etc.).
Service Rate                      Maximum rate at which vehicles, executing a specific turn maneuver, can be discharged from a section of roadway at the prevailing conditions, expressed in vehicles per second (vps) or vehicles per hour (vph).
Service Volume                    Maximum number of vehicles which can pass over a section of roadway in one direction during a specified time period with operating conditions at a specified Level of Service (The Service Volume at the upper bound of Level of Service, E, equals Capacity).
Service Volume is usually expressed as vehicles per hour (vph).
Signal Cycle Length                The total elapsed time to display all signal indications, in sequence.
The cycle length is expressed in seconds.
Signal Interval                    A single combination of signal indications. The interval duration is expressed in seconds. A signal phase is comprised of a sequence of signal intervals, usually green, yellow, red.
R.E. Ginna Nuclear Power Plant                      A1                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
Term                          Definition Signal Phase                  A set of signal indications (and intervals) which services a particular combination of traffic movements on selected approaches to the intersection. The phase duration is expressed in seconds.
Traffic (Trip) Assignment      A process of assigning traffic to paths of travel in such a way as to satisfy all trip objectives (i.e., the desire of each vehicle to travel from a specified origin in the network to a specified destination) and to optimize some stated objective or combination of objectives. In general, the objective is stated in terms of minimizing a generalized "cost". For example, "cost" may be expressed in terms of travel time.
Traffic Density                The number of vehicles that occupy one lane of a roadway section of specified length at a point in time, expressed as vehicles per mile (vpm).
Traffic (Trip) Distribution    A process for determining the destinations of all traffic generated at the origins. The result often takes the form of a Trip Table, which is a matrix of origindestination traffic volumes.
Traffic Simulation            A computer model designed to replicate the realworld operation of vehicles on a roadway network, so as to provide statistics describing traffic performance. These statistics are called Measures of Effectiveness.
Traffic Volume                The number of vehicles that pass over a section of roadway in one direction, expressed in vehicles per hour (vph). Where applicable, traffic volume may be stratified by turn movement.
Travel Mode                    Distinguishes between private auto, bus, rail, pedestrian and air travel modes.
Trip Table or Origin          A rectangular matrix or table, whose entries contain the number Destination Matrix            of trips generated at each specified origin, during a specified time period, that are attracted to (and travel toward) each of its specified destinations. These values are expressed in vehicles per hour (vph) or in vehicles.
Turning Capacity              The capacity associated with that component of the traffic stream which executes a specified turn maneuver from an approach at an intersection.
R.E. Ginna Nuclear Power Plant                  A2                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
APPENDIX B DTRAD: Dynamic Traffic Assignment and Distribution Model
 
B. DYNAMIC TRAFFIC ASSIGNMENT AND DISTRIBUTION MODEL This section describes the integrated dynamic trip assignment and distribution model named DTRAD (Dynamic Traffic Assignment and Distribution) that is expressly designed for use in analyzing evacuation scenarios. DTRAD employs logitbased pathchoice principles and is one of the models of the DYNEVII System. The DTRAD module implements pathbased Dynamic Traffic Assignment (DTA) so that time dependent OriginDestination (OD) trips are assigned to routes over the network based on prevailing traffic conditions.
To apply the DYNEV II System, the analyst must specify the highway network, link capacity information, the timevarying volume of traffic generated at all origin centroids and, optionally, a set of accessible candidate destination nodes on the periphery of the EPZ for selected origins.
DTRAD calculates the optimal dynamic trip distribution (i.e., trip destinations) and the optimal dynamic trip assignment (i.e., trip routing) of the traffic generated at each origin node traveling to its set of candidate destination nodes, so as to minimize evacuee travel cost.
Overview of Integrated Distribution and Assignment Model The underlying premise is that the selection of destinations and routes is intrinsically coupled in an evacuation scenario. That is, people in vehicles seek to travel out of an area of potential risk as rapidly as possible by selecting the best routes. The model is designed to identify these best routes in a manner that realistically distributes vehicles from origins to destinations and routes them over the highway network, in a consistent and optimal manner, reflecting evacuee behavior.
For each origin, a set of candidate destination nodes is selected by the software logic and by the analyst to reflect the desire by evacuees to travel away from the power plant and to access major highways. The specific destination nodes within this set that are selected by travelers and the selection of the connecting paths of travel, are both determined by DTRAD. This determination is made by a logitbased path choice model in DTRAD, so as to minimize the trip cost, as discussed later.
The traffic loading on the network and the consequent operational traffic environment of the network (density, speed, throughput on each link) vary over time as the evacuation takes place.
The DTRAD model, which is interfaced with the DYNEV simulation model, executes a succession of sessions wherein it computes the optimal routing and selection of destination nodes for the conditions that exist at that time.
Interfacing the DYNEV Simulation Model with DTRAD The DYNEV II system reflects NRC guidance that evacuees will seek to travel in a general direction away from the location of the hazardous event. An algorithm was developed to support the DTRAD model in dynamically varying the Trip Table (OD matrix) over time from one DTRAD session to the next. Another algorithm executes a mapping from the specified geometric network (linknode analysis network) that represents the physical highway system, to a path network that represents the vehicle [turn] movements. DTRAD computations are performed on the path network: DYNEV simulation model, on the geometric network.
R.E. Ginna Nuclear Power Plant                  B1                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
DTRAD Description DTRAD is the DTA module for the DYNEV II System.
When the road network under study is large, multiple routing options are usually available between trip origins and destinations. The problem of loading traffic demands and propagating them over the network links is called Network Loading and is addressed by DYNEVII using macroscopic traffic simulation modeling. Traffic assignment deals with computing the distribution of the traffic over the road network for given OD demands and is a model of the route choice of the drivers. Travel demand changes significantly over time, and the road network may have time dependent characteristics, e.g., timevarying signal timing or reduced road capacity because of lane closure, or traffic congestion. To consider these time dependencies, DTA procedures are required.
The DTRAD DTA module represents the dynamic route choice behavior of drivers, using the specification of dynamic origindestination matrices as flow input. Drivers choose their routes through the network based on the travel cost they experience (as determined by the simulation model). This allows traffic to be distributed over the network according to the timedependent conditions. The modeling principles of DTRAD include:
It is assumed that drivers not only select the best route (i.e., lowest cost path) but some also select less attractive routes. The algorithm implemented by DTRAD archives several efficient routes for each OD pair from which the drivers choose.
The choice of one route out of a set of possible routes is an outcome of discrete choice modeling. Given a set of routes and their generalized costs, the percentages of drivers that choose each route is computed. The most prevalent model for discrete choice modeling is the logit model. DTRAD uses a variant of PathSizeLogit model (PSL). PSL overcomes the drawback of the traditional multinomial logit model by incorporating an additional deterministic path size correction term to address path overlapping in the random utility expression.
DTRAD executes the TA algorithm on an abstract network representation called "the path network" which is built from the actual physical linknode analysis network. This execution continues until a stable situation is reached: the volumes and travel times on the edges of the path network do not change significantly from one iteration to the next. The criteria for this convergence are defined by the user.
Travel cost plays a crucial role in route choice. In DTRAD, path cost is a linear summation of the generalized cost of each link that comprises the path. The generalized cost for a link, a, is expressed as ca  ta  la  sa ,
where ca is the generalized cost for link a, and  ,  , and  are cost coefficients for link travel time, distance, and supplemental cost, respectively. Distance and supplemental costs are defined as invariant properties of the network model, while travel time is a dynamic property dictated by prevailing traffic conditions. The DYNEV simulation model R.E. Ginna Nuclear Power Plant                    B2                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
computes travel times on all edges in the network and DTRAD uses that information to constantly update the costs of paths. The route choice decision model in the next simulation iteration uses these updated values to adjust the route choice behavior. This way, traffic demands are dynamically reassigned based on time dependent conditions.
The interaction between the DTRAD traffic assignment and DYNEV II simulation models is depicted in Figure B1. Each round of interaction is called a Traffic Assignment Session (TA session). A TA session is composed of multiple iterations, marked as loop B in the figure.
The supplemental cost is based on the survival distribution (a variation of the exponential distribution).The Inverse Survival Function is a cost term in DTRAD to represent the potential risk of travel toward the plant:
sa =  ln (p), 0  p  l ;  0 p=
dn = Distance of node, n, from the plant d0 =Distance from the plant where there is zero risk
          = Scaling factor The value of do = 15 miles, the outer distance of the shadow region. Note that the supplemental cost, sa, of link, a, is (high, low), if its downstream node, n, is (near, far from) the power plant.
R.E. Ginna Nuclear Power Plant                    B3                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
Network Equilibrium In 1952, John Wardrop wrote:
Under equilibrium conditions traffic arranges itself in congested networks in such a way that no individual tripmaker can reduce his path costs by switching routes.
The above statement describes the User Equilibrium definition, also called the Selfish Driver Equilibrium. It is a hypothesis that represents a [hopeful] condition that evolves over time as drivers search out alternative routes to identify those routes that minimize their respective costs. It has been found that this equilibrium objective to minimize costs is largely realized by most drivers who routinely take the same trip over the same network at the same time (i.e.,
commuters). Effectively, such drivers learn which routes are best for them over time. Thus, the traffic environment settles down to a nearequilibrium state.
Clearly, since an emergency evacuation is a sudden, unique event, it does not constitute a long term learning experience which can achieve an equilibrium state. Consequently, DTRAD was not designed as an equilibrium solution, but to represent drivers in a new and unfamiliar situation, who respond in a flexible manner to realtime information (either broadcast or observed) in such a way as to minimize their respective costs of travel.
R.E. Ginna Nuclear Power Plant                  B4                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Start of next DTRAD Session A
Set T0 Clock time.
Archive System State at T0 Define latest Link Turn Percentages Execute Simulation Model from B                      time, T0 to T1 (burn time)
Provide DTRAD with link MOE at time, T1 Execute DTRAD iteration; Get new Turn Percentages Retrieve System State at T0 ;
Apply new Link Turn Percents DTRAD iteration converges?
No                        Yes Next iteration            Simulate from T0 to T2 (DTA session duration)
Set Clock to T2 B                          A Figure B1. Flow Diagram of SimulationDTRAD Interface R.E. Ginna Nuclear Power Plant                          B5                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                Rev. 1
 
APPENDIX C DYNEV Traffic Simulation Model
 
C. DYNEV TRAFFIC SIMULATION MODEL The DYNEV traffic simulation model is a macroscopic model that describes the operations of traffic flow in terms of aggregate variables: vehicles, flow rate, mean speed, volume, density, queue length, on each link, for each turn movement, during each Time Interval (simulation time step). The model generates trips from sources and from Entry Links and introduces them onto the analysis network at rates specified by the analyst based on the mobilization time distributions. The model simulates the movements of all vehicles on all network links over time until the network is empty. At intervals, the model outputs Measures of Effectiveness (MOE) such as those listed in Table C1.
Model Features Include:
Explicit consideration is taken of the variation in density over the time step; an iterative procedure is employed to calculate an average density over the simulation time step for the purpose of computing a mean speed for moving vehicles.
Multiple turn movements can be serviced on one link; a separate algorithm is used to estimate the number of (fractional) lanes assigned to the vehicles performing each turn movement, based, in part, on the turn percentages provided by the DTRAD model.
At any point in time, traffic flow on a link is subdivided into two classifications: queued and moving vehicles. The number of vehicles in each classification is computed. Vehicle spillback, stratified by turn movement for each network link, is explicitly considered and quantified. The propagation of stopping waves from link to link is computed within each time step of the simulation. There is no vertical stacking of queues on a link.
Any link can accommodate source flow from zones via side streets and parking facilities that are not explicitly represented. This flow represents the evacuating trips that are generated at the source.
The relation between the number of vehicles occupying the link and its storage capacity is monitored every time step for every link and for every turn movement. If the available storage capacity on a link is exceeded by the demand for service, then the simulator applies a metering rate to the entering traffic from both the upstream feeders and source node to ensure that the available storage capacity is not exceeded.
A path network that represents the specified traffic movements from each network link is constructed by the model; this path network is utilized by the DTRAD model.
A twoway interface with DTRAD: (1) provides link travel times; (2) receives data that translates into link turn percentages.
Provides MOE to animation software, EVAN Calculates ETE statistics R.E. Ginna Nuclear Power Plant                    C1                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
All traffic simulation models are dataintensive. Table C2 outlines the necessary input data elements.
To provide an efficient framework for defining these specifications, the physical highway environment is represented as a network. The unidirectional links of the network represent roadway sections: rural, multilane, urban streets or freeways. The nodes of the network generally represent intersections or points along a section where a geometric property changes (e.g. a lane drop, change in grade or free flow speed).
Figure C1 is an example of a small network representation. The freeway is defined by the sequence of links, (20,21), (21,22), and (22,23). Links (8001, 19) and (3, 8011) are Entry and Exit links, respectively. An arterial extends from node 3 to node 19 and is partially subsumed within a grid network. Note that links (21,22) and (17,19) are gradeseparated.
Table C1. Selected Measures of Effectiveness Output by DYNEV II Measure                                Units                                Applies To Vehicles Discharged            Vehicles                                      Link, Network, Exit Link Speed                          Miles/Hours (mph)                              Link, Network Density                        Vehicles/Mile/Lane                            Link Level of Service              LOS                                            Link Content                        Vehicles                                      Network Travel Time                    Vehiclehours                                  Network Evacuated Vehicles            Vehicles                                      Network, Exit Link Trip Travel Time              Vehicleminutes/trip                          Network Capacity Utilization          Percent                                        Exit Link Attraction                    Percent of total evacuating vehicles          Exit Link Max Queue                      Vehicles                                      Node, Approach Time of Max Queue              Hours:minutes                                  Node, Approach Length (mi); Mean Speed (mph); Travel Route Statistics                                                              Route Time (min)
Mean Travel Time              Minutes                                        Evacuation Trips; Network R.E. Ginna Nuclear Power Plant                      C2                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
Table C2. Input Requirements for the DYNEV II Model HIGHWAY NETWORK Links defined by upstream and downstream node numbers Link lengths Number of lanes (up to 9) and channelization Turn bays (1 to 3 lanes)
Destination (exit) nodes Network topology defined in terms of downstream nodes for each receiving link Node Coordinates (X,Y)
Nuclear Power Plant Coordinates (X,Y)
GENERATED TRAFFIC VOLUMES On all entry links and source nodes (origins), by Time Period TRAFFIC CONTROL SPECIFICATIONS Traffic signals: linkspecific, turn movement specific Signal control treated as fixed time or actuated Location of traffic control points (these are represented as actuated signals)
Stop and Yield signs Rightturnonred (RTOR)
Route diversion specifications Turn restrictions Lane control (e.g. lane closure, movementspecific)
DRIVERS AND OPERATIONAL CHARACTERISTICS Drivers (vehiclespecific) response mechanisms: freeflow speed, discharge headway Bus route designation.
DYNAMIC TRAFFIC ASSIGNMENT Candidate destination nodes for each origin (optional)
Duration of DTA sessions Duration of simulation burn time Desired number of destination nodes per origin INCIDENTS Identify and Schedule of closed lanes Identify and Schedule of closed links R.E. Ginna Nuclear Power Plant                      C3                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
8011 8009            2            3                8104 8107          6                5          8008 8010            8            9                10          8007 8012          12                11          8006 8005            13            14              8014 15                25          8004 16                24          8024 17 8003      23              22                              21          20    8002 Entry, Exit Nodes are                  19 numbered 8xxx 8001 Figure C1. Representative Analysis Network R.E. Ginna Nuclear Power Plant                      C4                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
C.1    Methodology C.1.1 The Fundamental Diagram It is necessary to define the fundamental diagram describing flowdensity and speeddensity relationships. Rather than settling for a triangular representation, a more realistic representation that includes a capacity drop, (IR)Qmax, at the critical density when flow conditions enter the forced flow regime, is developed and calibrated for each link. This representation, shown in Figure C2, asserts a constant free speed up to a density, k , and then a linear reduction in speed in the range, k    k k      45 vpm, the density at capacity. In the flowdensity plane, a quadratic relationship is prescribed in the range, k          k    95 vpm which roughly represents the stopandgo condition of severe congestion. The value of flow rate, Q , corresponding to k , is approximated at 0.7 RQ                . A linear relationship between k and k completes the diagram shown in Figure C2. Table C3 is a glossary of terms.
The fundamental diagram is applied to moving traffic on every link. The specified calibration values for each link are: (1) Free speed, v ; (2) Capacity, Q        ; (3) Critical density, k 45 vpm ; (4) Capacity Drop Factor, R = 0.9 ; (5) Jam density, k . Then, v              , k    k
            . Setting k    k  k , then Q  RQ                k for 0      k  k    50 . It can be shown that Q        0.98    0.0056 k RQ    for k    k    k , where k      50 and k      175.
C.1.2 The Simulation Model The simulation model solves a sequence of unit problems. Each unit problem computes the movement of traffic on a link, for each specified turn movement, over a specified time interval (TI) which serves as the simulation time step for all links. Figure C3 is a representation of the unit problem in the timedistance plane. Table C3 is a glossary of terms that are referenced in the following description of the unit problem procedure.
R.E. Ginna Nuclear Power Plant                  C5                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Volume, vph Capacity Drop Qmax R Qmax Qs Density, vpm Flow Regimes Speed, mph Free      Forced vf R vc Density, vpm kf          kc                              kj ks Figure C2. Fundamental Diagrams R.E. Ginna Nuclear Power Plant                      C6                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                  Rev. 1
 
Distance OQ      OM        OE Down Qb          vQ                Qe v
v L
Mb                              Me Up t1        t2 Time E1            E2 TI Figure C3. A UNIT Problem Configuration with t1 > 0 R.E. Ginna Nuclear Power Plant                      C7                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                            Rev. 1
 
Table C3. Glossary The maximum number of vehicles, of a particular movement, that can discharge Cap from a link within a time interval.
The number of vehicles, of a particular movement, that enter the link over the E
time interval. The portion, ETI, can reach the stopbar within the TI.
The green time: cycle time ratio that services the vehicles of a particular turn G/C movement on a link.
h        The mean queue discharge headway, seconds.
k        Density in vehicles per lane per mile.
The average density of moving vehicles of a particular movement over a TI, on a k
link.
L        The length of the link in feet.
The queue length in feet of a particular movement, at the [beginning, end] of a L ,L time interval.
The number of lanes, expressed as a floating point number, allocated to service a LN particular movement on a link.
L        The mean effective length of a queued vehicle including the vehicle spacing, feet.
M        Metering factor (Multiplier): 1.
The number of moving vehicles on the link, of a particular movement, that are M ,M          moving at the [beginning, end] of the time interval. These vehicles are assumed to be of equal spacing, over the length of link upstream of the queue.
The total number of vehicles of a particular movement that are discharged from a O
link over a time interval.
The components of the vehicles of a particular movement that are discharged from a link within a time interval: vehicles that were Queued at the beginning of O ,O ,O the TI; vehicles that were Moving within the link at the beginning of the TI; vehicles that Entered the link during the TI.
The percentage, expressed as a fraction, of the total flow on the link that P
executes a particular turn movement, x.
R.E. Ginna Nuclear Power Plant                    C8                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
The number of queued vehicles on the link, of a particular turn movement, at the Q ,Q
[beginning, end] of the time interval.
The maximum flow rate that can be serviced by a link for a particular movement Q          in the absence of a control device. It is specified by the analyst as an estimate of link capacity, based upon a field survey, with reference to the HCM.
R        The factor that is applied to the capacity of a link to represent the capacity drop when the flow condition moves into the forced flow regime. The lower capacity at that point is equal to RQ    .
RCap      The remaining capacity available to service vehicles of a particular movement after that queue has been completely serviced, within a time interval, expressed as vehicles.
S        Service rate for movement x, vehicles per hour (vph).
t        Vehicles of a particular turn movement that enter a link over the first t seconds of a time interval, can reach the stopbar (in the absence of a queue down stream) within the same time interval.
TI        The time interval, in seconds, which is used as the simulation time step.
v        The mean speed of travel, in feet per second (fps) or miles per hour (mph), of moving vehicles on the link.
v        The mean speed of the last vehicle in a queue that discharges from the link within the TI. This speed differs from the mean speed of moving vehicles, v.
W        The width of the intersection in feet. This is the difference between the link length which extends from stopbar to stopbar and the block length.
R.E. Ginna Nuclear Power Plant                    C9                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
The formulation and the associated logic presented below are designed to solve the unit problem for each sweep over the network (discussed below), for each turn movement serviced on each link that comprises the evacuation network, and for each TI over the duration of the evacuation.
Given      Q , M , L , TI , E , LN , G C , h , L , R , L , E , M Compute O , Q , M Define O O              O    O ; E E        E
: 1. For the first sweep, s = 1, of this TI, get initial estimates of mean density, k , the R - factor, R and entering traffic, E , using the values computed for the final sweep of the prior TI.
For each subsequent sweep, s 1 , calculate E  P O S where P , O are the relevant turn percentages from feeder link, i , and its total outflow (possibly metered) over this TI; S is the total source flow (possibly metered) during the current TI.
Set iteration counter, n = 0, k k , and E E .
: 2. Calculate v k such that k 130 using the analytical representations of the fundamental diagram.
Q      TI G Calculate Cap 3600      C LN , in vehicles, this value may be reduced due to metering Set R 1.0 if G C 1 or if k k ; Set R 0.9 only if G C 1 and k k L
Calculate queue length,          L    Q LN
: 3. Calculate t            TI    . If t  0 , set t      E    O    0 ; Else, E    E    .
: 4. Then E            E    E ; t      TI  t
: 5. If Q          Cap , then O      Cap , O      O    0 If t      0 , then Q      Q    M    E    Cap Else Q      Q    Cap End if Calculate Q and M using Algorithm A below
: 6. Else Q  Cap O      Q ,        RCap  Cap    O
: 7.        If M        RCap , then R.E. Ginna Nuclear Power Plant                      C10                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
t Cap
: 8.                  If t    0,      O      M ,O      min RCap    M ,          0 TI Q      E      O If Q      0 , then Calculate Q , M with Algorithm A Else Q      0, M    E End if Else t      0 O                M and O      0 M      M    O    E; Q    0 End if
: 9.      Else M O      0 If t    0 , then O      RCap , Q      M      O    E Calculate Q and M using Algorithm A
: 10.              Else t      0 M                  M If M              ,
O      RCap Q      M    O Apply Algorithm A to calculate Q and M Else O      M M      M    O    E and Q      0 End if End if End if End if
: 11. Calculate a new estimate of average density, k              k    2k      k ,
where k = density at the beginning of the TI k = density at the end of the TI k = density at the midpoint of the TI All values of density apply only to the moving vehicles.
If k      k          and n N where N      max number of iterations, and  is a convergence criterion, then R.E. Ginna Nuclear Power Plant                    C11                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
: 12.      set n    n    1 , and return to step 2 to perform iteration, n, using k          k .
End if Computation of unit problem is now complete. Check for excessive inflow causing spillback.
: 13. If Q        M                  ,    then The number of excess vehicles that cause spillback is: SB                Q    M                  ,
where W is the width of the upstream intersection. To prevent spillback, meter the outflow from the feeder approaches and from the source flow, S, during this TI by the amount, SB. That is, set SB M 1                        0 , where M is the metering factor over all movements .
E S This metering factor is assigned appropriately to all feeder links and to the source flow, to be applied during the next network sweep, discussed later.
Algorithm A This analysis addresses the flow environment over a TI during which moving vehicles can join a standing or discharging queue. For the case Qb        vQ                                      shown, Q          Cap, with t      0 and a queue of Qe Qe    length, Q , formed by that portion of M and E that reaches the stopbar within the TI, but could v                                not discharge due to inadequate capacity. That is, Mb                                                  Q      M    E          . This    queue      length, v                            Q      Q    M      E    Cap  can  be extended    to Q L3 by traffic entering the approach during the current TI, traveling at speed, v, and reaching the rear of the t1 t3                                      queue within the TI. A portion of the entering TI                              vehicles, E      E , will likely join the queue. This analysis calculates t , Q and M for the input values of L, TI, v, E, t, L , LN, Q .
When t        0 and Q            Cap:
L                                                                            L Define: L      Q        . From the sketch,        L    v TI t      t      L    Q    E            .
LN                                                                          LN Substituting E            E yields: vt            E      L v TI t            L . Recognizing that the first two terms on the right hand side cancel, solve for t to obtain:
R.E. Ginna Nuclear Power Plant                        C12                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                  Rev. 1
 
L t                                such that 0        t    TI  t E L v
TI LN If the denominator, v            0, set t    TI    t .
t                    t      t Then, Q      Q    E    ,  M    E 1 TI                      TI The complete Algorithm A considers all flow scenarios; space limitation precludes its inclusion, here.
C.1.3 Lane Assignment The unit problem is solved for each turn movement on each link. Therefore it is necessary to calculate a value, LN , of allocated lanes for each movement, x. If in fact all lanes are specified by, say, arrows painted on the pavement, either as full lanes or as lanes within a turn bay, then the problem is fully defined. If however there remain unchannelized lanes on a link, then an analysis is undertaken to subdivide the number of these physical lanes into turn movement specific virtual lanes, LNx.
C.2    Implementation C.2.1 Computational Procedure The computational procedure for this model is shown in the form of a flow diagram as Figure C4. As discussed earlier, the simulation model processes traffic flow for each link independently over TI that the analyst specifies; it is usually 60 seconds or longer. The first step is to execute an algorithm to define the sequence in which the network links are processed so that as many links as possible are processed after their feeder links are processed, within the same network sweep. Since a general network will have many closed loops, it is not possible to guarantee that every link processed will have all of its feeder links processed earlier.
The processing then continues as a succession of time steps of duration, TI, until the simulation is completed. Within each time step, the processing performs a series of sweeps over all network links; this is necessary to ensure that the traffic flow is synchronous over the entire network. Specifically, the sweep ensures continuity of flow among all the network links; in the context of this model, this means that the values of E, M, and S are all defined for each link such that they represent the synchronous movement of traffic from each link to all of its outbound links. These sweeps also serve to compute the metering rates that control spillback.
Within each sweep, processing solves the unit problem for each turn movement on each link.
With the turn movement percentages for each link provided by the DTRAD model, an algorithm R.E. Ginna Nuclear Power Plant                C13                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
allocates the number of lanes to each movement serviced on each link. The timing at a signal, if any, applied at the downstream end of the link, is expressed as a G/C ratio, the signal timing needed to define this ratio is an input requirement for the model. The model also has the capability of representing, with macroscopic fidelity, the actions of actuated signals responding to the timevarying competing demands on the approaches to the intersection.
The solution of the unit problem yields the values of the number of vehicles, O, that discharge from the link over the time interval and the number of vehicles that remain on the link at the end of the time interval as stratified by queued and moving vehicles: Q and M . The procedure considers each movement separately (multipiping). After all network links are processed for a given network sweep, the updated consistent values of entering flows, E; metering rates, M; and source flows, S are defined so as to satisfy the no spillback condition.
The procedure then performs the unit problem solutions for all network links during the following sweep.
Experience has shown that the system converges (i.e. the values of E, M and S settle down for all network links) in just two sweeps if the network is entirely undersaturated or in four sweeps in the presence of extensive congestion with link spillback. (The initial sweep over each link uses the final values of E and M, of the prior TI). At the completion of the final sweep for a TI, the procedure computes and stores all measures of effectiveness for each link and turn movement for output purposes. It then prepares for the following time interval by defining the values of Q and M for the start of the next TI as being those values of Q and M at the end of the prior TI. In this manner, the simulation model processes the traffic flow over time until the end of the run. Note that there is no spacediscretization other than the specification of network links.
R.E. Ginna Nuclear Power Plant                  C14                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Sequence Network Links Next Timestep, of duration, TI A
Next sweep; Define E, M, S for all B
Links C                            Next Link D                  Next Turn Movement, x Get lanes, LNx Service Rate, Sx ; G/Cx Get inputs to Unit Problem:
Q b , Mb , E Solve Unit Problem: Q e , Me , O No      D Last Movement ?
Yes No Last Link ?                    C Yes No      B Last Sweep ?
Yes Calc., store all Link MOE Set up next TI :
No      A Last Time - step ?
Yes DONE Figure C4. Flow of Simulation Processing (See Glossary: Table C3)
R.E. Ginna Nuclear Power Plant                        C15                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                Rev. 1
 
C.2.2 Interfacing with Dynamic Traffic Assignment (DTRAD)
The DYNEV II system reflects NRC guidance that evacuees will seek to travel in a general direction away from the location of the hazardous event. Thus, an algorithm was developed to identify an appropriate set of destination nodes for each origin based on its location and on the expected direction of travel. This algorithm also supports the DTRAD model in dynamically varying the Trip Table (OD matrix) over time from one DTRAD session to the next.
Figure B1 depicts the interaction of the simulation model with the DTRAD model in the DYNEV II system. As indicated, DYNEV II performs a succession of DTRAD sessions; each such session computes the turn link percentages for each link that remain constant for the session duration, T , T , specified by the analyst. The end product is the assignment of traffic volumes from each origin to paths connecting it with its destinations in such a way as to minimize the networkwide cost function. The output of the DTRAD model is a set of updated link turn percentages which represent this assignment of traffic.
As indicated in Figure B1, the simulation model supports the DTRAD session by providing it with operational link MOE that are needed by the path choice model and included in the DTRAD cost function. These MOE represent the operational state of the network at a time, T      T , which lies within the session duration, T , T . This burn time, T            T , is selected by the analyst. For each DTRAD iteration, the simulation model computes the change in network operations over this burn time using the latest set of link turn percentages computed by the DTRAD model. Upon convergence of the DTRAD iterative procedure, the simulation model accepts the latest turn percentages provided by the DTA model, returns to the origin time, T , and executes until it arrives at the end of the DTRAD session duration at time, T . At this time the next DTA session is launched and the whole process repeats until the end of the DYNEV II run.
Additional details are presented in Appendix B.
R.E. Ginna Nuclear Power Plant                C16                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
APPENDIX D Detailed Description of Study Procedure
 
D. DETAILED DESCRIPTION OF STUDY PROCEDURE This appendix describes the activities that were performed to compute Evacuation Time Estimates. The individual steps of this effort are represented as a flow diagram in Figure D1.
Each numbered step in the description that follows corresponds to the numbered element in the flow diagram.
Step 1 The first activity was to obtain EPZ boundary information and create a GIS base map. The base map extends beyond the Shadow Region which extends approximately 15 miles (radially) from the power plant location. The base map incorporates the local roadway topology, a suitable topographic background and the EPZ boundary.
Step 2 2010 Census block information was obtained in GIS format. This information was used to estimate the resident population within the EPZ and Shadow Region and to define the spatial distribution and demographic characteristics of the population within the study area. Data for employees, transients, schools, and other facilities were obtained from local emergency management agencies.
Step 3 A kickoff meeting was conducted with major stakeholders (state and local emergency managers, onsite and offsite utility emergency managers, local and state law enforcement agencies). The purpose of the kickoff meeting was to present an overview of the work effort, identify key agency personnel, and indicate the data requirements for the study. Specific requests for information were presented to local emergency managers. Unique features of the study area were discussed to identify the local concerns that should be addressed by the ETE study.
Step 4 Next, a physical survey of the roadway system in the study area was conducted to determine the geometric properties of the highway sections, the channelization of lanes on each section of roadway, whether there are any turn restrictions or special treatment of traffic at intersections, the type and functioning of traffic control devices, gathering signal timings for pretimed traffic signals, and to make the necessary observations needed to estimate realistic values of roadway capacity.
Step 5 A telephone survey of households within the EPZ was conducted to identify household dynamics, trip generation characteristics, and evacuationrelated demographic information of the EPZ population. This information was used to determine important study factors including the average number of evacuating vehicles used by each household, and the time required to perform preevacuation mobilization activities.
R.E. Ginna Nuclear Power Plant                D1                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Step 6 A computerized representation of the physical roadway system, called a linknode analysis network, was developed using the UNITES software developed by KLD. Once the geometry of the network was completed, the network was calibrated using the information gathered during the road survey (Step 4). Estimates of highway capacity for each link and other linkspecific characteristics were introduced to the network description. Traffic signal timings were input accordingly. The linknode analysis network was imported into a GIS map. 2010 Census data were overlaid in the map, and origin centroids where trips would be generated during the evacuation process were assigned to appropriate links.
Step 7 The EPZ is subdivided into 16 ERPAs. Based on wind direction and speed, Regions (groupings of ERPA) that may be advised to evacuate, were developed.
The need for evacuation can occur over a range of timeofday, dayofweek, seasonal and weatherrelated conditions. Scenarios were developed to capture the variation in evacuation demand, highway capacity and mobilization time, for different time of day, day of the week, time of year, and weather conditions.
Step 8 The input stream for the DYNEV II model, which integrates the dynamic traffic assignment and distribution model, DTRAD, with the evacuation simulation model, was created for a prototype evacuation case - the evacuation of the entire EPZ for a representative scenario.
Step 9 After creating this input stream, the DYNEV II System was executed on the prototype evacuation case to compute evacuating traffic routing patterns consistent with the appropriate NRC guidelines. DYNEV II contains an extensive suite of data diagnostics which check the completeness and consistency of the input data specified. The analyst reviews all warning and error messages produced by the model and then corrects the database to create an input stream that properly executes to completion.
The model assigns destinations to all origin centroids consistent with a (general) radial evacuation of the EPZ and Shadow Region. The analyst may optionally supplement and/or replace these modelassigned destinations, based on professional judgment, after studying the topology of the analysis highway network. The model produces link and networkwide measures of effectiveness as well as estimates of evacuation time.
Step 10 The results generated by the prototype evacuation case are critically examined. The examination includes observing the animated graphics (using the EVAN software which operates on data produced by DYNEV II) and reviewing the statistics output by the model. This is a laborintensive activity, requiring the direct participation of skilled engineers who possess the necessary practical experience to interpret the results and to determine the causes of any problems reflected in the results.
R.E. Ginna Nuclear Power Plant                  D2                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
Essentially, the approach is to identify those bottlenecks in the network that represent locations where congested conditions are pronounced and to identify the cause of this congestion. This cause can take many forms, either as excess demand due to high rates of trip generation, improper routing, a shortfall of capacity, or as a quantitative flaw in the way the physical system was represented in the input stream. This examination leads to one of two conclusions:
The results are satisfactory; or The input stream must be modified accordingly.
This decision requires, of course, the application of the user's judgment and experience based upon the results obtained in previous applications of the model and a comparison of the results of the latest prototype evacuation case iteration with the previous ones. If the results are satisfactory in the opinion of the user, then the process continues with Step 13. Otherwise, proceed to Step 11.
Step 11 There are many "treatments" available to the user in resolving apparent problems. These treatments range from decisions to reroute the traffic by assigning additional evacuation destinations for one or more sources, imposing turn restrictions where they can produce significant improvements in capacity, changing the control treatment at critical intersections so as to provide improved service for one or more movements, or in prescribing specific treatments for channelizing the flow so as to expedite the movement of traffic along major roadway systems. Such "treatments" take the form of modifications to the original prototype evacuation case input stream. All treatments are designed to improve the representation of evacuation behavior.
Step 12 As noted above, the changes to the input stream must be implemented to reflect the modifications undertaken in Step 11. At the completion of this activity, the process returns to Step 9 where the DYNEV II System is again executed.
Step 13 Evacuation of transitdependent evacuees and special facilities are included in the evacuation analysis. Fixed routing for transit buses and for school buses, ambulances, and other transit vehicles are introduced into the final prototype evacuation case data set. DYNEV II generates routespecific speeds over time for use in the estimation of evacuation times for the transit dependent and special facility population groups.
Step 14 The prototype evacuation case was used as the basis for generating all region and scenario specific evacuation cases to be simulated. This process was automated through the UNITES user interface. For each specific case, the population to be evacuated, the trip generation distributions, the highway capacity and speeds, and other factors are adjusted to produce a customized casespecific data set.
R.E. Ginna Nuclear Power Plant                  D3                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Step 15 All evacuation cases are executed using the DYNEV II System to compute ETE. Once results were available, quality control procedures were used to assure the results were consistent, dynamic routing was reasonable, and traffic congestion/bottlenecks were addressed properly.
Step 16 Once vehicular evacuation results are accepted, average travel speeds for transit and special facility routes were used to compute evacuation time estimates for transitdependent permanent residents, schools, hospitals, and other special facilities.
Step 17 The simulation results are analyzed, tabulated and graphed.            The results were then documented, as required by NUREG/CR7002.
Step 18 Following the completion of documentation activities, the ETE criteria checklist (see Appendix N) was completed. An appropriate report reference is provided for each criterion provided in the checklist.
R.E. Ginna Nuclear Power Plant                D4                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                  Rev. 1
 
A Step 1 Step 10 Create GIS Base Map                    Examine Results of Prototype Evacuation Case using EVAN and DYNEV II Output Step 2 Gather Census Block and Demographic Data for                                          Results Satisfactory Study Area Step 11 Step 3 Modify Evacuation Destinations and/or Develop Conduct Kickoff Meeting with Stakeholders                  Traffic Control Treatments Step 4                                                Step 12 Field Survey of Roadways within Study Area        Modify Database to Reflect Changes to Prototype Evacuation Case Step 5 Conduct Telephone Survey and Develop Trip Generation Characteristics B
Step 13 Step 6 Establish Transit and Special Facility Evacuation Create and Calibrate LinkNode Analysis Network          Routes and Update DYNEV II Database Step 14 Step 7 Generate DYNEV II Input Streams for All Evacuation Cases Develop Evacuation Regions and Scenarios Step 15 Step 8 Execute DYNEV II to Compute ETE for All Create and Debug DYNEV II Input Stream                          Evacuation Cases Step 16 Step 9 Use DYNEV II Average Speed Output to Compute ETE for Transit and Special Facility Routes B        Execute DYNEV II for Prototype Evacuation Case Step 17 Documentation A                                                                  Step 18 Complete ETE Criteria Checklist Figure D1. Flow Diagram of Activities R.E. Ginna Nuclear Power Plant                              D5                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                  Rev. 1
 
APPENDIX E Special Facility Data
 
E. SPECIAL FACILITY DATA The following tables list population information, as of August, 2012, for special facilities that are located within the Ginna EPZ. Special facilities are defined as schools, preschools and medical care facilities. Transient population data is included in the tables for recreational areas and lodging facilities. Employment data is included in the tables for major employers. Each table is grouped by county. The location of the facility is defined by its straightline distance (miles) and direction (magnetic bearing) from the center point of the plant. Maps of each school, preschool, medical facility, major employer, recreational area and lodging facility are also provided.
R.E. Ginna Nuclear Power Plant                E1                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
Table E1. Schools and within the EPZ Distance  Dire                                                                                              Enroll ERPA  (miles)  ction              School Name                  Street Address      Municipality        Phone        ment  Staff MONROE COUNTY M1    5.6    WSW    Schlegel Road Elementary School    1548 Schlegel Road      Webster          (585) 2652500    512    77 M4    7.9      SW    Spry Middle School                  119 South Ave          Webster          (585) 2656500  1,048  161 M4    7.7      SW    State Road Elementary School        1401State Road          Webster          (585) 8724200    536    69 Klem Road North Elementary M6    8.2    WSW                                        1015 Klem Road          Webster          (585) 8721770    534    66 School Klem Road South Elementary M6    8.2    WSW                                        1025 Klem Road          Webster          (585) 8721320    533    70 School M6    7.8    WSW    Webster Christian School            675 Holt Road          Webster          (585) 8725150    220    38 M7    9.5    WSW    Schroeder High School              875 Ridge Road          Webster          (585) 6705000  1,504  308 M9    9.2    WSW    Thomas High School                  800 Five Mile Line Road Webster          (585) 6708000  1,388  216 M9    8.8    WSW    Willink Middle School              900 Publishers Parkway  Webster          (585) 6701030    977    163 S.R. 10.9    WSW    Dewitt Road Elementary School      722 Dewitt Road        Webster          (585) 6710710    517    73 Plank Road North Elementary S.R. 11.0      SW                                        705 Plank Road          Penfield        (585) 6718858    576    63 School Plank Road South Elementary S.R. 11.1      SW                                        715 Plank Road          Webster          (585) 6713190    557    80 School S.R. 12.3      SW    Rochester Christian School          260 Embury Road        Rochester        (585) 6714910    106    20 S.R. 11.0    WSW    St Rita's School                    1008 Maple Drive        Webster          (585) 6713132    332    33 Monroe County Subtotals:  9,340  1,437 WAYNE COUNTY 6200 Ontario Center W2    3.8        S  James A. Beneway High School                                Ontario Center  (315) 5241050    811    148 Road W2    3.8        S  Ontario Elementary School          1730 Ridge Road        Ontario Center  (315) 5241153    356    194 W2    3.9        S  Ontario Primary School              1730 Ridge Road        Ontario Center  (315) 5241150    347    40 Thomas C. Armstrong Middle          6076 Ontario Center W2    3.9        S                                                              Ontario          (315) 5241080    549    166 School                              Road W5    7.9      ESE  Wayne Education Center              4440 Ridge Road        Williamson      (315) 5897900    179    31 W5    7.9      ESE  Wayne Finger Lake BOCES            4440 Ridge Road        Williamson      (315) 3327400    19      7 W5    7.9      ESE  Wayne Technical & Career Center    4440 Ridge Road        Williamson      (315) 5897900    231    44 W5    7.6      ESE  Williamson Elementary School        6036 Highland Avenue    Williamson      (315) 5899668    460    85 W5    7.5      ESE  Williamson Middle School            4184 Miller Street      Williamson      (315) 5899665    325    95 W5    7.3      SE  Williamson Senior High School      5891 New York 21        Williamson      (315) 5899621    378    100 Marion Central Middle/High W6    9.5      SE                                      4034 Warner Road        Marion          (315) 9264228    563    76 School W7    8.2        S  Freewill Elementary School          4320 Canandaigua Road  Walworth        (315) 5241170    314    52 S.R. 11.0      SSE  Marion Elementary School            3863 North Main Street  Marion          (315) 9264256    625    83 Wayne County Subtotals:  5,157  1,121 TOTAL:  14,497  2,558 R.E. Ginna Nuclear Power Plant                          E2                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                      Rev. 1
 
Table E2. Preschools within the EPZ Distance    Dire                                                                                            Enroll ERPA  (miles)    ction            School Name                  Street Address    Municipality      Phone          ment MONROE COUNTY Webster Early Learning Center M1      6.0    WSW                                      369 Phillips Road      Webster      (585) 2169740      82
                          & Day Care Railroad Junction School Age M3      7.3      SW                                      10 May Street          Webster      (585) 8722160      156 Program Toddler's Workshop Child M3      7.3      SW                                      12 May Street          Webster      (585) 8720663      149 Care Webster Presbyterian Church M3      6.5    WSW                                      550 Webster Road      Webster      (585) 2659700      21 Preschool M4      6.9      SW    Positive Preschool              1460 Ridge Road        Webster      (585) 2652002      28 M4      7.7      SW    Webster Nursery School          59 South Avenue        Webster      (585) 2652430      43 M6      8.1    WSW    Webster KinderCare              856 Holt Road          Webster      (585) 8726530      140 M6      8.1    WSW    YMCA of Greater Rochester        1025 Klem Road        Webster      (585) 6718414      80 Doodle Bugs! Children's M7      8.3      SW                                      979 Jackson Road      Webster      (585) 8722300      176 Centers M7    10.5      SW    Webster Montessori School        1310 5 Mile Line Road  Webster      (585) 3470055      118 M8    10.0    WSW    Woodside Nursery School          570 Klem Road          Webster      (585) 6716757      20 Monroe County Subtotals:    1,013 WAYNE COUNTY W2      4.1      SSE    Hop Skip & Jump Preschool        6341 Ontario Center Rd Ontario      (315) 5245537        89 Rhyme Tyme Child Care W2      3.8    SSW                                      944 New York 104      Ontario      (315) 5245170      74 Center W2      3.8    SSW    The Tot Spot Day Care Center      6225 Slocum Road      Ontario      (315) 5244264      155 W4      6.6      ESE    Raggedy Ann & Andy Day Care      3955 New York 104      Williamson    (315) 5899310      22 Lake Ontario Child W5      6.2      ESE                                    6395 Tuckahoe Road    Williamson    (315) 5897421      78 Development Wayne County Subtotals:      418 TOTAL:      1,431 R.E. Ginna Nuclear Power Plant                          E3                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
Table E3. Medical Facilities within the EPZ Ambul    Wheel      Bed Dist. Dire                                                                              Cap  Current  atory      chair      ridden ERPA    (miles)  ction        Facility Name      Street Address    Municipality          Phone      acity Census  Patients  Patients    Patients MONROE COUNTY Maplewood Nursing M4      7.7    SW                            100 Daniel Drive  Webster          (585) 8721800    74    73      10        63          0 Home M7      9.0    SW    Ahepa 67 Apartments    100 Ahepa Circle  Webster          (585) 8726300    50    50      45          5          0 900 Cherry Ridge M7      9.4    WSW    Cherry Ridge                              Webster          (585) 6976700  273    273    206        64          3 Boulevard Quinby Park Senior    1030 Shoecraft M7      9.2    WSW                                              Webster          (585) 6711450    49    49      45          4          0 Apartments            Road Monroe County Subtotals:  446    445    306        136          3 WAYNE COUNTY Ontario Community      2420 Trimble W1      2.9    SE                                              Ontario          (315) 5241970    10    10      7          3          0 Residence              Road Pines of Peace Hospice W5      4.5    SSE                          2378 Ridge Road    Ontario          (315) 5242388    2      2      1          1          0 Center Williamson W5      7.1    ESE                          4080 Circle Drive  Williamson      (315) 5898811    7      7      5          2          0 Community Residence Wayne ARC Day 2261 Marion W7      9.8      S    Activity Training                        Walworth        (315) 9861630    28    28      19          9          0 Road Program Wayne County Subtotals:    47    47      32        15          0 TOTAL: 493    492    338        151          3 R.E. Ginna Nuclear Power Plant                                            E4                                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                  Rev. 1
 
Table E4. Major Employers within the EPZ Distance    Dire                                                                                        Employees  % Non    Employees ERPA    (miles)    ction          Facility Name              Street Address      Municipality      Phone      (max shift)  EPZ      (Non EPZ)
MONROE COUNTY M1      5.4      SW    Paychex Inc.                    675 Basket Road        Webster        (585) 2160820      550      50%          275 M3      6.5      SW    Xerox Headquarters              800 Phillips Road      Webster        (585) 4229098    7,500    98%        7,350 M4      8.1      WSW    Wegmans                        900 Holt Road          Webster        (585) 8720780      250      10%          25 M7      9.1      WSW    Hegedorn's Inc.                964 Ridge Road        Webster        (585) 6710230      80      25%          20 M7      9.6      WSW    Lowe's Home Improvement        900 5 Mile Line Road  Webster        (585) 7877900      110      25%          28 M7      8.5      WSW    Towne Center at Webster        1028 Ridge Road        Webster        N/A                90      61%          55 M7      9.1      WSW    Webster Square                  950 Ridge Road        Webster        N/A                100      50%          50 Monroe County Subtotals:    8,680              7,803 WAYNE COUNTY W1      0.0        S    R.E. Ginna Nuclear Power Plant  1503 Lake Road        Ontario        N/A                450      50%          225 W2      4.4      SW    Harbec Inc.                    369 New York 104      Ontario        (585) 2650010      141      44%          63 W2      4.3      SW    Optimax Systems Inc.            6367 Dean Parkway      Ontario        (585) 2651066      170      44%          75 W2      4.3      SW    Vette Corporation              6377 Dean Parkway      Ontario        (585) 2650330      65      44%          29 W2      4.3      SW    Weco Manufacturing              6364 Dean Parkway      Ontario        (585) 2653000      78      44%          35 W4      7.3      ESE  Dr Pepper Snapple Group        4363 New York 104      Williamson    (315) 5892011      353      44%          156 W4      7.5      ESE  R Brooks Associates Inc        6546 Pound Road        Williamson    (315) 5894000      69      44%          31 Wayne County Subtotals:    1,326                614 TOTAL:    10,006              8,417 R.E. Ginna Nuclear Power Plant                                            E5                                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                    Rev. 1
 
Table E5. Recreational Attractions within the EPZ Distance    Dire ERPA      (miles)  ction            Facility Name                Street Address          Municipality          Phone      Transients  Vehicles MONROE COUNTY M1        4.8    WSW    Irving R. Kent Park              1700 Schlegel Road          Webster            (585) 8722911      105          41 M1        4.9    WSW    Webster East Golf Course        440 Salt Road                Webster            (585) 2651708      20          8 M3        6.7    WSW    Webster Recreation Center        1350 Chiyoda Drive          Webster            (585) 8722911      114          45 M4        8.0      SW    Milton R. Case Park              South Avenue                Webster            (585) 8722911        6          2 M4        8.2      SW    Ridgecrest Park                  988 Ebner Drive              Webster            (585) 8722911      105          41 M6        7.8    WSW    North Ponds Park                750 Holt Road                Webster            (585) 8727103      90          35 M6        7.3      W    Webster County Park              255 Holt Road                Webster            (585) 8720083      272          91 M7        8.7    WSW    Ridge Park                      1000 Ridge Road              Webster            (585) 8722911      108          42 M8        9.9    WSW    Vosburg Road Park                Vosburg Road                Webster            (585) 8722911      30          12 M8        8.4    WSW    Whiting Road Park                Whiting Road                Webster            (585) 8722911      45          18 Monroe County Subtotals:    895        335 WAYNE COUNTY W2        4.7      SSE    The Brookwoods Country Club      2101 Country Club Lane      Ontario            (315) 5247184      90          36 W3        6.2      E    Pultneyville Marina              7539 Lake Avenue            Pultneyville      (315) 5898922      259        101 Hughes Marina/Anchor W4        8.3      E                                      5003 Lake Road              Williamson        (315) 5892752        8          3 Campsites W7        7.9      S    Greystone Golf Club              1400 Atlantic Avenue        Walworth          (585) 2344653      130          51 Wayne County Subtotals:    487        191 TOTAL:    1,382        526 R.E. Ginna Nuclear Power Plant                                              E6                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                          Rev. 1
 
Table E6. Lodging Facilities within the EPZ Distance  Dire ERPA    (miles)  ction                Facility Name                  Street Address            Municipality      Phone      Transients  Vehicles MONROE COUNTY Hampton Inn M6      8.8    WSW                                          878 Hard Road                  Webster        (585) 6712050    180        90 Rochester/Webster Holiday Inn Express Hotel &
M6      8.1    WSW                                          860 Holt Road                  Webster        (585) 8720900    208        104 Suites Webster M7      8.9    WSW      Fairfield inn                      915 Hard Road                  Webster        (585) 6711500    126        63 Monroe County Subtotals:    514        257 WAYNE COUNTY W2      3.9    SSW      Cornerstone Inn                    6270 Lakeside Road              Ontario        (315) 5245024      46        23 W2      4.4      SW      Ontario Motel                      440 State Route 104            Ontario        (585) 2651881    120        60 W2      3.5      SSE    The Twin Rock Motel                1785 New York 104              Ontario        (315) 5246411      40        20 Wayne County Subtotals:    206        103 TOTAL:    720        360 R.E. Ginna Nuclear Power Plant                                              E7                                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                          Rev. 1
 
Figure E1. Monroe County Schools within the EPZ R.E. Ginna Nuclear Power Plant                      E8                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure E2. Wayne County Schools within the EPZ R.E. Ginna Nuclear Power Plant                      E9                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Figure E3. Preschools within the EPZ R.E. Ginna Nuclear Power Plant                  E10                KLD Engineering, P.C.
Evacuation Time Estimate                                                          Rev. 1
 
Figure E4. Medical Facilities within the EPZ R.E. Ginna Nuclear Power Plant                    E11                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                  Rev. 1
 
Figure E5. Major Employers within the EPZ R.E. Ginna Nuclear Power Plant                    E12                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                Rev. 1
 
Figure E6. Recreational Areas within the EPZ R.E. Ginna Nuclear Power Plant                      E13                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                  Rev. 1
 
Figure E7. Lodging within the EPZ R.E. Ginna Nuclear Power Plant                E14                KLD Engineering, P.C.
Evacuation Time Estimate                                                        Rev. 1
 
APPENDIX F Telephone Survey
 
F. TELEPHONE SURVEY F.1    Introduction The development of evacuation time estimates for the Ginna EPZ requires the identification of travel patterns, car ownership and household size of the population within the EPZ.
Demographic information can be obtained from Census data. The use of this data has several limitations when applied to emergency planning. First, the Census data do not encompass the range of information needed to identify the time required for preliminary activities (mobilization) that must be undertaken prior to evacuating the area. Secondly, Census data do not contain attitudinal responses needed from the population of the EPZ and consequently may not accurately represent the anticipated behavioral characteristics of the evacuating populace.
These concerns are addressed by conducting a telephone survey of a representative sample of the EPZ population. The survey is designed to elicit information from the public concerning family demographics and estimates of response times to well defined events. The design of the survey includes a limited number of questions of the form What would you do if ? and other questions regarding activities with which the respondent is familiar (How long does it take you to ?)
R.E. Ginna Nuclear Power Plant                F1                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
F.2    Survey Instrument and Sampling Plan Attachment A presents the final survey instrument used in this study. A draft of the instrument was submitted to stakeholders for comment. Comments were received and the survey instrument was modified accordingly, prior to conducting the survey.1 Following the completion of the instrument, a sampling plan was developed. A sample size of approximately 500 completed survey forms yields results with a sampling error of +/-4.5% at the 95% confidence level. The sample must be drawn from the EPZ population. Consequently, a list of zip codes in the EPZ was developed using GIS software. This list is shown in Table F1. Along with each zip code, an estimate of the population and number of households in each area was determined by overlaying Census data and a close approximation of the EPZ boundary, again using GIS software. The proportional number of desired completed survey interviews for each area was identified, as shown in Table F1. Note that the average household size computed in Table F1 was an estimate for sampling purposes and was not used in the ETE study.
The completed survey adhered to the sampling plan.
Table F1. R.E. Ginna Nuclear Power Plant Telephone Survey Sampling Plan Population within                              Required Zip Code            EPZ (2010)            Households            Sample 14450                341                    112                  2 14502                1,358                  511                  10 14505                1,962                  723                  14 14519              11,254                  4,397                  87 14526                688                    253                  5 14551                  14                    6                    0 14568                2,479                  946                  19 14580              38,679                15,265                305 14589                7,334                  2,921                  58 Total              64,109                25,134                500 Average Household Size                              2.55 1
Wayne and Monroe County Emergency Planners requested that several additional questions be added to the telephone survey, in order to provide specific information that would be useful to them but that is not required for the calculation of ETE. The results from these supplementary questions were documented in a separate memo.
R.E. Ginna Nuclear Power Plant                        F2                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
F.3    Survey Results The results of the survey fall into two categories. First, the household demographics of the area can be identified. Demographic information includes such factors as household size, automobile ownership, and automobile availability. The distributions of the time to perform certain pre evacuation activities are the second category of survey results. These data are processed to develop the trip generation distributions used in the evacuation modeling effort, as discussed in Section 5.
A review of the survey instrument reveals that several questions have a dont know (DK) or refused entry for a response. It is accepted practice in conducting surveys of this type to accept the answers of a respondent who offers a DK response for a few questions or who refuses to answer a few questions. To address the issue of occasional DK/refused responses from a large sample, the practice is to assume that the distribution of these responses is the same as the underlying distribution of the positive responses. In effect, the DK/refused responses are ignored and the distributions are based upon the positive data that is acquired.
F.3.1    Household Demographic Results Household Size Figure F1 presents the distribution of household size within the EPZ. The average household contains 2.56 people. The estimated household size (2.55 persons) used to determine the survey sample (Table F1) was drawn from Census data. The close agreement between the average household size obtained from the survey and from the Census is an indication of the reliability of the survey.
Ginna Household Size 50%
40%
              % of Households 30%
20%
10%
0%
1  2        3      4        5      6        7  8    9 Household Size Figure F1. Household Size in the EPZ R.E. Ginna Nuclear Power Plant                                  F3                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                                    Rev. 1
 
Automobile Ownership The average number of automobiles available per household in the EPZ is 2.00. It should be noted that approximately 1.4 percent of households do not have access to an automobile. The distribution of automobile ownership is presented in Figure F2. Figure F3 and Figure F4 present the automobile availability by household size. Note that the majority of households without access to a car are single person households. As expected, nearly all households of 2 or more people have access to at least one vehicle.
Ginna Vehicle Availability 60%
50%
              % of Households 40%
30%
20%
10%
0%
0  1      2      3        4    5        6    7  8    9+
Number of Vehicles Figure F2. Household Vehicle Availability R.E. Ginna Nuclear Power Plant                                  F4                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                      Rev. 1
 
Distribution of Vehicles by HH Size 15 Person Households 1 Person      2 People      3 People              4 People  5 People 100%
80%
                % of Households 60%
40%
20%
0%
0        1      2      3            4        5        6    7    8    9+
Vehicles Figure F3. Vehicle Availability  1 to 5 Person Households Distribution of Vehicles by HH Size 69+ Person Households 6 People        7 People            8 People      9+ People 100%
80%
                % of Households 60%
40%
20%
0%
0        1      2      3            4        5        6    7    8    9+
Vehicles Figure F4. Vehicle Availability  6 to 9+ Person Households R.E. Ginna Nuclear Power Plant                                            F5                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                          Rev. 1
 
Ridesharing 75% of the households surveyed (who do not own a vehicle) responded that they would share a ride with a neighbor, relative, or friend if a car was not available to them when advised to evacuate in the event of an emergency. Note, however, that only those households with no access to a vehicle - 8 total out of the sample size of 500 - answered this question. Thus, the results are not statistically significant. As such, the NRC recommendation of 50% ridesharing is used throughout this study. Figure F5 presents this response.
Ginna Rideshare with Neighbor/Friend 100%
80%
              % of Households 60%
40%
20%
0%
Yes                                No Figure F5. Household Ridesharing Preference R.E. Ginna Nuclear Power Plant                              F6                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
Commuters Figure F6 presents the distribution of the number of commuters in each household.
Commuters are defined as household members who travel to work or college on a daily basis.
The data shows an average of 1.14 commuters in each household in the EPZ, and 65% of households have at least one commuter.
Ginna Commuters 50%
40%
              % of Households 30%
20%
10%
0%
0            1            2            3      4+
Number of Commuters Figure F6. Commuters in Households in the EPZ R.E. Ginna Nuclear Power Plant                            F7                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
Commuter Travel Modes Figure F7 presents the mode of travel that commuters use on a daily basis. The vast majority of commuters use their private automobiles to travel to work. The data shows an average of 1.08 employees per vehicle, assuming 2 people per vehicle - on average - for carpools.
Ginna Travel Mode to Work 100%                                              90.3%
80%
              % of Commuters 60%
40%
20%
7.5%
0.0%          0.9%            1.3%
0%
Rail          Bus        Walk/Bike      Drive Alone  Carpool (2+)
Mode of Travel Figure F7. Modes of Travel in the EPZ F.3.2  Evacuation Response Several questions were asked to gauge the populations response to an emergency. These are now discussed:
How many of the vehicles would your household use during an evacuation? The response is shown in Figure F8. On average, evacuating households would use 1.33 vehicles.
Would your family await the return of other family members prior to evacuating the area?
Of the survey participants who responded, 34 percent said they would await the return of other family members before evacuating and 66 percent indicated that they would not await the return of other family members.
What would you do with your pet(s) if you had to evacuate? Based on the responses to the survey, 44 percent of households do not have a family pet. Of the households with pets, 45 percent would take their pets to a public assembly center or shelter, 43 percent would take their pets somewhere else and 11 percent would not take their pets, as shown in Figure F9.
R.E. Ginna Nuclear Power Plant                                F8                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                          Rev. 1
 
Vehicles Used for Evacuation 100%
80%
60%
              % of Households 40%
20%
0%
0              1            2            3              4 Number of Vehicles Figure F8. Number of Vehicles Used for Evacuation Households Evacuating with Pets 100%
80%
              % of Households 60%
40%
20%
0%
Take it with me to a      Take it with me          Leave it at home public assembly center      somewhere else or shelter Figure F9. Households Evacuating with Pets R.E. Ginna Nuclear Power Plant                                      F9                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                  Rev. 1
 
Emergency officials advise you to take shelter at home in an emergency. Would you? This question is designed to elicit information regarding compliance with instructions to shelter in place. The results indicate that 75 percent of households who are advised to shelter in place would do so; the remaining 25 percent would choose to evacuate the area. Note the baseline ETE study assumes 20 percent of households will not comply with the shelter advisory, as per Section 2.5.2 of NUREG/CR7002. Thus, the data obtained above is in good agreement with the federal guidance.
Emergency officials advise you to take shelter at home now in an emergency and possibly evacuate later while people in other areas are advised to evacuate now. Would you? This question is designed to elicit information specifically related to the possibility of a staged evacuation. That is, asking a population to shelter in place now and then to evacuate after a specified period of time. Results indicate that 68 percent of households would follow instructions and delay the start of evacuation until so advised, while the balance of 32 percent would choose to begin evacuating immediately.
F.3.3    Time Distribution Results The survey asked several questions about the amount of time it takes to perform certain pre evacuation activities. These activities involve actions taken by residents during the course of their daytoday lives. Thus, the answers fall within the realm of the responders experience.
The mobilization distributions provided below are the result of having applied the analysis described in Section 5.4.1 on the component activities of the mobilization.
R.E. Ginna Nuclear Power Plant                  F10                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
How long does it take the commuter to complete preparation for leaving work? Figure F10 presents the cumulative distribution; in all cases, the activity is completed by about 75 minutes.
Ninety percent can leave within 30 minutes.
Time to Prepare to Leave Work 100%
80%
                % of Commuters 60%
40%
20%
0%
0          15          30          45            60      75 Preparation Time (min)
Figure F10. Time Required to Prepare to Leave Work/School How long would it take the commuter to travel home? Figure F11 presents the work to home travel time for the EPZ. About 90 percent of commuters can arrive home within about 35 minutes of leaving work; all within 60 minutes.
Work to Home Travel 100%
80%
                % of Commuters 60%
40%
20%
0%
0                15            30            45            60 Travel Time (min)
Figure F11. Work to Home Travel Time R.E. Ginna Nuclear Power Plant                                      F11                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
How long would it take the family to pack clothing, secure the house, and load the car?
Figure F12 presents the time required to prepare for leaving on an evacuation trip. In many ways this activity mimics a familys preparation for a short holiday or weekend away from home. Hence, the responses represent the experience of the responder in performing similar activities.
The distribution shown in Figure F12 has a long tail. About 87 percent of households can be ready to leave home within 60 minutes; the remaining households require up to an additional hour and a half.
Time to Prepare to Leave Home 100%
80%
                % of Households 60%
40%
20%
0%
0          30          60          90          120    150 Preparation Time (min)
Figure F12. Time to Prepare Home for Evacuation R.E. Ginna Nuclear Power Plant                                    F12                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                                      Rev. 1
 
How long would it take you to clear 6 to 8 inches of snow from your driveway? During adverse, snowy weather conditions, an additional activity must be performed before residents can depart on the evacuation trip. Although snow scenarios assume that the roads and highways have been plowed and are passable (albeit at lower speeds and capacities), it may be necessary to clear a private driveway prior to leaving the home so that the vehicle can access the street. Figure F13 presents the time distribution for removing 6 to 8 inches of snow from a driveway. The time distribution for clearing the driveway has a long tail; about 88 percent of driveways are passable within 30 minutes. The last driveway is cleared 135 minutes after the start of this activity. Note that those respondents (56%) who answered that they would not take time to clear their driveway were assumed to be ready immediately at the start of this activity. Essentially they would drive through the snow on the driveway to access the roadway and begin their evacuation trip.
Time to Remove Snow from Driveway 100%
80%
                % of Households 60%
40%
20%
0%
0      15    30    45    60    75      90    105      120  135 Travel Time (min)
Figure F13. Time to Clear Driveway of 6"8" of Snow F.4  Conclusions The telephone survey provides valuable, relevant data associated with the EPZ population, which have been used to quantify demographics specific to the EPZ, and mobilization time which can influence evacuation time estimates.
R.E. Ginna Nuclear Power Plant                                      F13                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
ATTACHMENT A Telephone Survey Instrument R.E. Ginna Nuclear Power Plant            F14            KLD Engineering, P.C.
Evacuation Time Estimate                                                Rev. 1
 
Telephone Survey Instrument Hello, my name is ___________ and Im working on a survey for                            COL. 1    Unused your county emergency management agency to identify local                                COL. 2    Unused behavior during emergency situations. This information will be                          COL. 3    Unused used for emergency planning and will be shared with local officials                      COL. 4    Unused to enhance emergency response plans in your area for all hazards, some of which may require evacuation. Your responses will greatly                        COL. 5    Unused contribute to local emergency preparedness. I will not ask for your                        Sex    COL. 8 name or any personal information, and the survey will take less                                    1 Male than 10 minutes to complete.                                                                      2 Female INTERVIEWER: ASK TO SPEAK TO THE HEAD OF HOUSEHOLD OR THE SPOUSE OF THE HEAD OF HOUSEHOLD.
(Terminate call if not a residence.)
DO NOT ASK:
1A. Record area code. To Be Determined                  COL. 911 1B. Record exchange number. To Be Determined            COL. 1214 2A. What is your home zip code? (DO NOT READ            COL. 15 ANSWERS) 14450                                                1 14502                                                2 14505                                                3 14519                                                4 14526                                                5 14568                                                6 14580                                                7 14589                                                8 All Other Zip Codes or Dont Know/Refused            Out of Study Area - Terminate Call 3A. In total, how many running cars, or other            COL. 20                            SKIP TO vehicles are usually available to the household?    1  ONE                            Q. 4 (DO NOT READ ANSWERS)                                2  TWO                            Q. 4 3  THREE                          Q. 4 4  FOUR                          Q. 4 5  FIVE                          Q. 4 6  SIX                            Q. 4 7  SEVEN                          Q. 4 8  EIGHT                          Q. 4 9  NINE OR MORE                  Q. 4 R.E. Ginna Nuclear Power Plant                          15                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                    Rev. 1
 
0  ZERO (NONE)                    Q. 3B X DONT KNOW/REFUSED              Q. 3B 3B. In an emergency, could you get a ride out of the      COL. 21 area with a neighbor or friend?                      1  YES 2  NO X DONT KNOW/REFUSED
: 4. How many people usually live in this household?      COL. 22                  COL. 23 (DO NOT READ ANSWERS)                                1  ONE                  0  TEN 2  TWO                  1  ELEVEN 3  THREE                2  TWELVE 4  FOUR                3  THIRTEEN 5  FIVE                4  FOURTEEN 6  SIX                  5  FIFTEEN 7  SEVEN                6  SIXTEEN 8  EIGHT                7  SEVENTEEN 9  NINE                8  EIGHTEEN 9  NINETEEN OR MORE X DONT KNOW/REFUSED
: 5. How many people in the household commute to a          COL. 24                            SKIP TO job, or to college on a daily basis?                  0  ZERO                          Q. 9 1  ONE                            Q. 6 2  TWO                            Q. 6 3  THREE                          Q. 6 4  FOUR OR MORE                  Q. 6 5  DONT KNOW/REFUSED            Q. 9 INTERVIEWER:      For each person identified in Question 5, ask Questions 6, 7, and 8.
: 6. Thinking about commuter #1, how does that person usually travel to work or college? (REPEAT QUESTION FOR EACH COMMUTER)
Commuter #1        Commuter #2          Commuter #3        Commuter #4 COL. 25              COL. 26              COL. 27            COL. 28 Bus                                    2                    2                    2                  2 Walk/Bicycle                            3                    3                    3                  3 Drive Alone                            4                    4                    4                  4 Carpool2 or more people                5                    5                    5                  5 Dont know/Refused                      6                    6                    6                  6
: 7. How much time on average, would it take Commuter #1 to travel home from work or college? (REPEAT QUESTION FOR EACH COMMUTER) (DO NOT READ ANSWERS)
COMMUTER #1                                                COMMUTER #2 R.E. Ginna Nuclear Power Plant                            16                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                      Rev. 1
 
COL. 29                    COL. 30                    COL. 31              COL. 32 1  5 MINUTES OR LESS      1    4650 MINUTES        1  5 MINUTES OR LESS 1    4650 MINUTES 2  610 MINUTES            2    5155 MINUTES        2  610 MINUTES      2    5155 MINUTES 3  1115 MINUTES          3    56 - 1 HOUR          3  1115 MINUTES    3  56 - 1 HOUR OVER 1 HOUR, BUT                                OVER 1 HOUR, BUT 4  1620 MINUTES          4    LESS THAN 1 HOUR 15  4  1620 MINUTES    4    LESS THAN 1 HOUR MINUTES                                          15 MINUTES BETWEEN 1 HOUR 16                                BETWEEN 1 HOUR 16 5  2125 MINUTES          5    MINUTES AND 1 HOUR    5  2125 MINUTES    5  MINUTES AND 1 30 MINUTES                                      HOUR 30 MINUTES BETWEEN 1 HOUR 31                              BETWEEN 1 HOUR 31 6  2630 MINUTES          6    MINUTES AND 1 HOUR    6  2630 MINUTES    6    MINUTES AND 1 45 MINUTES                                      HOUR 45 MINUTES BETWEEN 1 HOUR 46                              BETWEEN 1 HOUR 46 7  3135 MINUTES          7    MINUTES AND 2        7  3135 MINUTES    7  MINUTES AND 2 HOURS                                          HOURS OVER 2 HOURS                                    OVER 2 HOURS 8  3640 MINUTES          8                          8  3640 MINUTES    8 (SPECIFY ______)                                (SPECIFY ______)
9  4145 MINUTES          9                          9  4145 MINUTES    9 0                                                0 DONT KNOW                                      DONT KNOW X                                                X
                                /REFUSED                                        /REFUSED R.E. Ginna Nuclear Power Plant                      17                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
COMMUTER #3                                        COMMUTER #4 COL. 33                        COL. 34                    COL. 35                COL. 36 1  5 MINUTES OR LESS          1    4650 MINUTES        1  5 MINUTES OR LESS  1    4650 MINUTES 2  610 MINUTES                2    5155 MINUTES        2  610 MINUTES        2    5155 MINUTES 3  1115 MINUTES              3    56 - 1 HOUR          3  1115 MINUTES      3    56 - 1 HOUR OVER 1 HOUR, BUT                                  OVER 1 HOUR, BUT 4  1620 MINUTES              4    LESS THAN 1 HOUR 15  4  1620 MINUTES      4    LESS THAN 1 HOUR MINUTES                                            15 MINUTES BETWEEN 1 HOUR 16                                  BETWEEN 1 HOUR 16 5  2125 MINUTES              5    MINUTES AND 1 HOUR    5  2125 MINUTES      5    MINUTES AND 1 30 MINUTES                                        HOUR 30 MINUTES BETWEEN 1 HOUR 31                                  BETWEEN 1 HOUR 31 6  2630 MINUTES              6    MINUTES AND 1 HOUR    6  2630 MINUTES      6    MINUTES AND 1 45 MINUTES                                        HOUR 45 MINUTES BETWEEN 1 HOUR 46                                  BETWEEN 1 HOUR 46 7  3135 MINUTES              7    MINUTES AND 2        7  3135 MINUTES      7    MINUTES AND 2 HOURS                                              HOURS OVER 2 HOURS                                      OVER 2 HOURS 8  3640 MINUTES              8                          8  3640 MINUTES      8 (SPECIFY ______)                                  (SPECIFY ______)
9  4145 MINUTES              9                          9  4145 MINUTES      9 0                                                  0 DONT KNOW                                        DONT KNOW X                                                  X
                                    /REFUSED                                          /REFUSED
: 8. Approximately how much time does it take Commuter #1 to complete preparation for leaving work or college prior to starting the trip home? (REPEAT QUESTION FOR EACH COMMUTER) (DO NOT READ ANSWERS)
COMMUTER #1                                        COMMUTER #2 COL. 37                        COL. 38                    COL. 39                COL. 40 1  5 MINUTES OR LESS          1    4650 MINUTES        1  5 MINUTES OR LESS  1    4650 MINUTES 2  610 MINUTES                2    5155 MINUTES        2  610 MINUTES        2    5155 MINUTES 3  1115 MINUTES              3    56 - 1 HOUR          3  1115 MINUTES      3    56 - 1 HOUR OVER 1 HOUR, BUT                                  OVER 1 HOUR, BUT 4  1620 MINUTES              4    LESS THAN 1 HOUR 15  4  1620 MINUTES      4    LESS THAN 1 HOUR MINUTES                                            15 MINUTES BETWEEN 1 HOUR 16                                  BETWEEN 1 HOUR 16 5  2125 MINUTES              5    MINUTES AND 1 HOUR    5  2125 MINUTES      5    MINUTES AND 1 30 MINUTES                                        HOUR 30 MINUTES BETWEEN 1 HOUR 31                                  BETWEEN 1 HOUR 31 6  2630 MINUTES              6    MINUTES AND 1 HOUR    6  2630 MINUTES      6    MINUTES AND 1 45 MINUTES                                        HOUR 45 MINUTES BETWEEN 1 HOUR 46                                  BETWEEN 1 HOUR 46 7  3135 MINUTES              7    MINUTES AND 2        7  3135 MINUTES      7    MINUTES AND 2 HOURS                                              HOURS OVER 2 HOURS                                      OVER 2 HOURS 8  3640 MINUTES              8                          8  3640 MINUTES      8 (SPECIFY ______)                                  (SPECIFY ______)
9  4145 MINUTES              9                          9  4145 MINUTES      9 0                                                  0 R.E. Ginna Nuclear Power Plant                          18                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                Rev. 1
 
X    DONT KNOW /REFUSED                                  X    DONT KNOW /REFUSED COMMUTER #3                                                  COMMUTER #4 COL. 41                      COL. 42                        COL. 43                  COL. 44 1  5 MINUTES OR LESS        1    4650 MINUTES              1  5 MINUTES OR LESS    1    4650 MINUTES 2  610 MINUTES              2    5155 MINUTES              2  610 MINUTES          2    5155 MINUTES 3  1115 MINUTES            3    56 - 1 HOUR                3  1115 MINUTES        3    56 - 1 HOUR OVER 1 HOUR, BUT OVER 1 HOUR, BUT LESS 4  1620 MINUTES            4    LESS THAN 1 HOUR 15        4  1620 MINUTES        4 THAN 1 HOUR 15 MINUTES MINUTES BETWEEN 1 HOUR 16                                          BETWEEN 1 HOUR 16 5  2125 MINUTES            5    MINUTES AND 1 HOUR        5  2125 MINUTES        5    MINUTES AND 1 HOUR 30 30 MINUTES                                                MINUTES BETWEEN 1 HOUR 31                                          BETWEEN 1 HOUR 31 6  2630 MINUTES            6    MINUTES AND 1 HOUR        6  2630 MINUTES        6    MINUTES AND 1 HOUR 45 45 MINUTES                                                MINUTES BETWEEN 1 HOUR 46 BETWEEN 1 HOUR 46 7  3135 MINUTES            7    MINUTES AND 2              7  3135 MINUTES        7 MINUTES AND 2 HOURS HOURS OVER 2 HOURS                                              OVER 2 HOURS (SPECIFY 8  3640 MINUTES            8                              8  3640 MINUTES        8 (SPECIFY ______)                                          ______)
9  4145 MINUTES            9                              9  4145 MINUTES        9 0                                                        0 X    DONT KNOW /REFUSED                                  X    DONT KNOW /REFUSED
: 9. If you were advised by local authorities to evacuate, how much time would it take the household to pack clothing, medications, secure the house, load the car, and complete preparations prior to evacuating the area? (DO NOT READ ANSWERS)
COL. 45                                                  COL. 46 1    LESS THAN 15 MINUTES                                1  3 HOURS TO 3 HOURS 15 MINUTES 2    1530 MINUTES                                        2  3 HOURS 16 MINUTES TO 3 HOURS 30 MINUTES 3    3145 MINUTES                                        3  3 HOURS 31 MINUTES TO 3 HOURS 45 MINUTES 4    46 MINUTES - 1 HOUR                                  4  3 HOURS 46 MINUTES TO 4 HOURS 5    1 HOUR TO 1 HOUR 15 MINUTES                          5  4 HOURS TO 4 HOURS 15 MINUTES 6    1 HOUR 16 MINUTES TO 1 HOUR 30 MINUTES              6  4 HOURS 16 MINUTES TO 4 HOURS 30 MINUTES 7    1 HOUR 31 MINUTES TO 1 HOUR 45 MINUTES              7  4 HOURS 31 MINUTES TO 4 HOURS 45 MINUTES 8    1 HOUR 46 MINUTES TO 2 HOURS                        8  4 HOURS 46 MINUTES TO 5 HOURS 9    2 HOURS TO 2 HOURS 15 MINUTES                        9  5 HOURS TO 5 HOURS 30 MINUTES 0    2 HOURS 16 MINUTES TO 2 HOURS 30 MINUTES            0  5 HOURS 31 MINUTES TO 6 HOURS X    2 HOURS 31 MINUTES TO 2 HOURS 45 MINUTES            X  OVER 6 HOURS (SPECIFY _______)
Y    2 HOURS 46 MINUTES TO 3 HOURS Z    WILL NOT EVACUATE                                    COL. 47 1  DONT KNOW/REFUSED R.E. Ginna Nuclear Power Plant                            19                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                    Rev. 1
 
10    If there is 68 of snow on your driveway or curb, would you need to shovel out to evacuate? If yes, how
  . much time, on average, would it take you to clear the 68 of snow to move the car from the driveway or curb to begin the evacuation trip? Assume the roads are passable. (DO NOT READ RESPONSES)
COL. 48                                                  COL. 49 1    LESS THAN 15 MINUTES                                1    OVER 3 HOURS (SPECIFY _______)
2    1530 MINUTES                                      2    DONT KNOW/REFUSED 3    3145 MINUTES 4    46 MINUTES - 1 HOUR 5    1 HOUR TO 1 HOUR 15 MINUTES 6    1 HOUR 16 MINUTES TO 1 HOUR 30 MINUTES 7    1 HOUR 31 MINUTES TO 1 HOUR 45 MINUTES 8    1 HOUR 46 MINUTES TO 2 HOURS 9    2 HOURS TO 2 HOURS 15 MINUTES 0    2 HOURS 16 MINUTES TO 2 HOURS 30 MINUTES X    2 HOURS 31 MINUTES TO 2 HOURS 45 MINUTES Y    2 HOURS 46 MINUTES TO 3 HOURS Z    NO, WILL NOT SHOVEL OUT
: 11. Please choose one of the following (READ              COL. 50 ANSWERS):                                              1    A A. I would await the return of household commuters to evacuate together.                        2    B B. I would evacuate independently and meet            X    DONT KNOW/REFUSED other household members later.
: 12. How many vehicles would your household use during an evacuation? (DO NOT READ ANSWERS)
COL. 51 1      ONE 2      TWO 3      THREE 4      FOUR 5      FIVE 6      SIX 7      SEVEN 8      EIGHT 9      NINE OR MORE 0      ZERO (NONE)
X      DONT KNOW/REFUSED R.E. Ginna Nuclear Power Plant                            20                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                      Rev. 1
 
13A. Emergency officials advise you to          COL. 52 shelterinplace in an emergency          1    A because you are not in the area of risk.
2    B Would you: (READ ANSWERS)
X DONT KNOW/REFUSED A. SHELTERINPLACE; or B. EVACUATE 13B. Emergency officials advise you to          COL. 53 shelterinplace now in an emergency      1    A and possibly evacuate later while 2    B people in other areas are advised to evacuate now. Would you: (READ            X DONT KNOW/REFUSED ANSWERS)
A. SHELTERINPLACE; or B. EVACUATE 13C.      Emergency officials advise you to evacuate in an emergency. Where would you evacuate to?:
(DO NOT READ ANSWERS)
COL 54 1      A RELATIVES OR FRIENDS HOME            (Go to Question 14) 2      A RECEPTION CENTER                        (Go to Question 13D) 3      A HOTEL, MOTEL OR CAMPGROUND              (Go to Question 14) 4      A SECOND/SEASONAL HOME                    (Go to Question 14) 5      OTHER (specify)                          (Go to Question 14) 6      WOULD NOT EVACUATE                        (Go to Question 14)
X      DONT KNOW REFUSED                        (Go to Question 14) 13D. After the Reception Center, do you plan on      COL. 55 going to a Red Cross Shelter?                    1    YES 2    NO X DONT KNOW/REFUSED 14A. What type of pets do you have, and how many of each type? (DO NOT READ ANSWERS)
COL 5660                                        COL 61: (For species listed in COL 56 list number of pets) 1      DOG                                    COL 62: (For species listed in COL 57 list number of pets) 2      CAT                                    COL 63: (For species listed in COL 58 list number of pets) 3      OTHER SMALL MAMMAL                      COL 64: (For species listed in COL 59 list number of pets) 4      BIRD                                    COL 65: (For species listed in COL 60 list number of pets) 5      REPTILE 6      HORSE 7      FISH 8      OTHER (Specify) 9      NO PETS (Go To End of Survey)
X      DONT KNOW/REFUSED R.E. Ginna Nuclear Power Plant                          21                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                      Rev. 1
 
14B. What would you do with your pet(s) if you had to evacuate? (READ ANSWERS)
COL. 66 1      TAKE IT WITH ME TO A SHELTER 2      TAKE IT WITH ME SOMEWHERE ELSE 3      LEAVE IT AT HOME X      DONT KNOW/REFUSED Thank you very much. _______________________________
(TELEPHONE NUMBER CALLED)
IF REQUESTED:
For additional information, contact your County Emergency Management Agency during normal business hours.
County        EMA Phone Wayne (315) 9465663 County Monroe (585) 7533810 County R.E. Ginna Nuclear Power Plant                          22                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
APPENDIX G Traffic Management Plan
 
G. TRAFFIC MANAGEMENT PLAN NUREG/CR7002 indicates that the existing TCPs and ACPs identified by the offsite agencies should be used in the evacuation simulation modeling. The traffic and access control plans for the EPZ were provided by each county.
These plans were reviewed and the TCPs were modeled accordingly.
G.1 Traffic Control Points As discussed in Section 9, traffic control points at intersections (which are controlled) are modeled as actuated signals. If an intersection has a pretimed signal, stop, or yield control, and the intersection is identified as a traffic control point, the control type was changed to an actuated signal in the DYNEV II system. Table K2 provides the control type and node number for those nodes which are controlled. If the existing control was changed due to the point being a Traffic Control Point, the control type is indicated as TCP in Table K2.
Figure G1 maps the TCPs identified in the county emergency plans. These TCPS are concentrated along ERPA boundaries and major intersections within the EPZ which were identified as the congested areas/roadways in Section 7.3. Theses TCPs would be manned during evacuation by traffic guides who would direct evacuees As discussed in Section 7.3, the animation of evacuation traffic conditions indicates several critical intersections which could be bottlenecks during evacuation. These critical intersections were crosschecked with the EPZ county emergency plans. All of the intersections, except two -
Shoecraft Road and State Road, and Shoecraft Road and Plank Road in Monroe County - were identified as TCPs in the county plan. As these are two of the last congested intersections to clear, the county may want to consider these intersection as TCPs.
Figure G2 and Figure G3 show the schematics for these TCPs, in case Monroe County should decide to add them to the traffic control plans. Both intersections are allway stops, a type of control that is not designed for high traffic volume. The use of a control officer facilitates the movement of traffic out of the EPZ and increases the vehicle flow rate on the feeder roadways.
G.2 Access Control Points It is assumed that ACPs will be established within 2 hours of the advisory to evacuate to discourage through travelers from using major through routes which traverse the EPZ. As discussed in Section 3.7, external traffic was only considered on three routes which traverse the study area - SR 104, I590 and I490 - in this analysis. The generation of these external trips ceased at 2 hours after the advisory to evacuate in the simulation.
According to the countys emergency plans, the access control points will be manned after the advisory to evacuate has been given. It is recommended that ACPs along the three aforementioned routes be the top priority in assigning manpower and equipment as they are R.E. Ginna Nuclear Power Plant                    G1                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
the major routes entering the EPZ, which will typically carry the highest volume of through traffic.
R.E. Ginna Nuclear Power Plant            G2                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                Rev. 1
 
Figure G1. Traffic Control Points for the R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant                                    G3                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Key MOVEMENT FACILITATED MUNICIPALITY: Webster, NY                            TCP                                  MOVEMENT DISCOURAGED/DIVERTED LOCATION:      Shoecraft Road & State Road TRAFFIC GUIDE            2 ft ID:            1 STOP SIGN ERPA:          M-7                                    Shoecraft Rd                                                          3 ft TRAFFIC BARRICADE 2 PER LANE (LOCAL ROADS AND RAMPS) 4 PER LANE (FREEWAY AND RAMPS)
TRAFFIC SIGNAL TRAFFIC CONES SPACED TO DISCOURAGE TRAFFIC BUT ALLOW PASSAGE (3 PER LANE):
8 ft State Rd      ACTIONS TO BE TAKEN
: 1. Discourage northbound traffic on Bypass Road MANPOWER/EQUIPMENT ESTIMATE 1  Traffic Guide 6  Traffic Cones LOCATION PRIORITY 1
N
                              **Traffic Guide should position himself safely Figure G2. Intersection of Shoecraft Road and State Road R.E. Ginna Nuclear Power Plant                                            G4                                                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                            Rev. 1
 
Key MOVEMENT FACILITATED MUNICIPALITY: Webster, NY                            TCP                                  MOVEMENT DISCOURAGED/DIVERTED LOCATION:      Shoecraft Road & Plank Road TRAFFIC GUIDE            2 ft ID:            1 STOP SIGN ERPA:          M-7                                      Shoecraft Rd                                                          3 ft TRAFFIC BARRICADE 2 PER LANE (LOCAL ROADS AND RAMPS) 4 PER LANE (FREEWAY AND RAMPS)
TRAFFIC SIGNAL TRAFFIC CONES SPACED TO DISCOURAGE TRAFFIC BUT ALLOW PASSAGE (3 PER LANE):
8 ft ACTIONS TO BE TAKEN
: 1. Discourage northbound traffic on Bypass Road Plank Rd      MANPOWER/EQUIPMENT ESTIMATE 1  Traffic Guide 6  Traffic Cones LOCATION PRIORITY 1
N
                              **Traffic Guide should position himself safely Figure G3. Intersection of Shoecraft Road and Plank Road R.E. Ginna Nuclear Power Plant                                            G5                                                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                            Rev. 1
 
APPENDIX H Evacuation Regions
 
H EVACUATION REGIONS This appendix presents the evacuation percentages for each Evacuation Region (Table H1) and maps of all Evacuation Regions. The percentages presented in Table H1 are based on the methodology discussed in assumption 5 of Section 2.2 and shown in Figure 21.
Note the baseline ETE study assumes 20 percent of households will not comply with the shelter advisory, as per Section 2.5.2 of NUREG/CR7002.
R.E. Ginna Nuclear Power Plant              H1                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                  Rev. 1
 
Table H1. Percent of ERPA Population Evacuating for Each Region Basic Regions ERPA Region        Description      Degrees    W1    W2    W3    W4      W5      W6    W7    M1    M2  M3  M4  M5  M6    M7    M8      M9 R01          2Mile Region              100%    20%    20%    20%    20%      20%    20%    20%    20%  20%  20%  20%  20%    20%    20%      20%
R02          5Mile Region              100%  100%    100%    20%      20%    20%    20%    100%    20%  20% 20%  20%  20%    20%    20%      20%
R03            Full EPZ                100%  100%    100%    100%    100%    100%  100%  100%    100%  100% 100% 100% 100%  100%  100%    100%
Evacuate 2Mile Region and Downwind to 5 Miles ERPA Region  Wind Direction From:  Degrees    W1    W2    W3    W4      W5      W6    W7    M1    M2  M3  M4  M5  M6    M7    M8      M9 R04                N          349 to 11 100%  100%    20%    20%      20%    20%    20%    20%    20%  20%  20%  20%  20%    20%    20%      20%
R05          NNE, NE, ENE      12 to 78 100%  100%    20%    20%      20%    20%    20%    100%    20%  20% 20%  20%  20%    20%    20%      20%
R06              E, ESE        79 to 124 100%    20%    20%    20%    20%      20%    20%    100%    20%  20% 20%  20%  20%    20%    20%      20%
SE, SSE, S, SSW, SW 125 to 236                                                      See Region R01 R07            WSW, W        237 to 281 100%    20%    100%    20%      20%    20%    20%    20%    20%  20%  20%  20%  20%    20%    20%      20%
R08        WNW, NW, NNW      282 to 348 100%  100%    100%    20%      20%    20%    20%    20%    20%  20%  20%  20%  20%    20%    20%      20%
Evacuate 5Mile Region and Downwind to the EPZ Boundary ERPA Region  Wind Direction From:  Degrees    W1    W2    W3    W4      W5      W6    W7    M1    M2  M3  M4  M5  M6    M7    M8      M9 R09                N          349 to 11 100%  100%    100%    20%    100%    100%  100%  100%    100%  20%  20% 100%  20%    20%    20%      20%
R10              NNE          12 to 33 100%  100%    100%    20%      20%    20%    100%  100%    100%  100% 100% 100%  20%  100%    20%      20%
R11                NE          34 to 56  100%  100%    100%    20%      20%    20%    100%  100%    100%  100% 100% 100% 100%  100%  100%    100%
R12              ENE          57 to 78 100%  100%    100%    20%      20%    20%    20%    100%    100%  100% 100% 100% 100%  100%  100%    100%
R13                E          79 to 101 100%  100%    100%    20%      20%    20%    20%    100%    20%  100% 100%  20% 100%  100%  100%    100%
R14                ESE        102 to 124 100%  100%    100%    20%      20%    20%    20%    100%    20%  20% 20%  20%  100%    20%  100%      20%
SE, SSE, S, SSW, SW 125 to 236                                                      See Region R02 R15              WSW          237 to 258 100%  100%    100%    100%      20%    20%    20%    100%    20%  20% 20%  20%  20%    20%    20%      20%
R16                W        259 to 281 100%  100%    100%    100%    100%      20%    20%  100%    20%  20% 20%  20%  20%    20%    20%      20%
R17              WNW          282 to 303 100%  100%    100%    100%    100%    100%    20%  100%    20%  20% 20%  20%  20%    20%    20%      20%
R18              NW          304 to 326 100%  100%    100%    100%    100%    100%  100%  100%    20%  20% 20%  20%  20%    20%    20%      20%
R19              NNW          327 to 348 100%  100%    100%    20%    100%    100%  100%  100%    20%  20% 20%  20%  20%    20%    20%      20%
R.E. Ginna Nuclear Power Plant                                              H2                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                  Rev. 1
 
Staged Evacuation  2Mile Region Evacuates, then Evacuate Downwind to 5 Miles ERPA Region  Wind Direction From:  Degrees      W1      W2    W3    W4      W5    W6    W7      M1      M2      M3      M4      M5    M6    M7    M8      M9 R20            No Wind                    100%      100%  100%    20%    20%    20%      20%    100%      20%      20%      20%      20%    20%    20%    20%      20%
R21                N          349 to 11    100%      100%    20%    20%    20%    20%      20%      20%      20%      20%      20%      20%    20%    20%    20%      20%
R22          NNE, NE, ENE      12 to 78    100%      100%    20%    20%    20%    20%      20%    100%      20%      20%      20%      20%    20%    20%    20%      20%
R23              E, ESE        79 to 124    100%      20%    20%    20%    20%    20%      20%    100%      20%      20%      20%      20%    20%    20%    20%      20%
SE, SSE, S, SSW, SW 125 to 236                                                              See Region R01 R24            WSW, W        237 to 281    100%      20%  100%    20%    20%    20%      20%      20%      20%      20%      20%      20%    20%    20%    20%      20%
R25        WNW, NW, NNW      282 to 348    100%      100%  100%    20%    20%    20%      20%      20%      20%      20%      20%      20%    20%    20%    20%      20%
Key ERPA Evacuate                  ERPA ShelterinPlace                                    ShelterinPlace until 90% ETE for R01, then Evacuate R.E. Ginna Nuclear Power Plant                                                  H3                                                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                                          Rev. 1
 
Figure H1. Region R01 R.E. Ginna Nuclear Power Plant          H4          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H2. Region R02 R.E. Ginna Nuclear Power Plant          H5          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H3. Region R03 R.E. Ginna Nuclear Power Plant          H6          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H4. Region R04 R.E. Ginna Nuclear Power Plant          H7          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H5. Region R05 R.E. Ginna Nuclear Power Plant          H8          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H6. Region R06 R.E. Ginna Nuclear Power Plant          H9          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H7. Region R07 R.E. Ginna Nuclear Power Plant          H10          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H8. Region R08 R.E. Ginna Nuclear Power Plant          H11          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H9. Region R09 R.E. Ginna Nuclear Power Plant          H12          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H10. Region R10 R.E. Ginna Nuclear Power Plant          H13          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H11. Region R11 R.E. Ginna Nuclear Power Plant          H14          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H12. Region R12 R.E. Ginna Nuclear Power Plant          H15          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H13. Region R13 R.E. Ginna Nuclear Power Plant          H16          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H14. Region R14 R.E. Ginna Nuclear Power Plant          H17          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H15. Region R15 R.E. Ginna Nuclear Power Plant          H18          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H16. Region R16 R.E. Ginna Nuclear Power Plant          H19          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H17. Region R17 R.E. Ginna Nuclear Power Plant          H20          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H18. Region R18 R.E. Ginna Nuclear Power Plant          H21          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H19. Region R19 R.E. Ginna Nuclear Power Plant          H22          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H20. Region R20 R.E. Ginna Nuclear Power Plant          H23          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H21. Region R21 R.E. Ginna Nuclear Power Plant          H24          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H22. Region R22 R.E. Ginna Nuclear Power Plant          H25          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H23. Region R23 R.E. Ginna Nuclear Power Plant          H26          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H24. Region R24 R.E. Ginna Nuclear Power Plant          H27          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
Figure H25. Region 25 R.E. Ginna Nuclear Power Plant          H28          KLD Engineering, P.C.
Evacuation Time Estimate                                            Rev. 1
 
APPENDIX J Representative Inputs to and Outputs from the DYNEV II System
 
J. REPRESENTATIVE INPUTS TO AND OUTPUTS FROM THE DYNEV II SYSTEM This appendix presents data input to and output from the DYNEV II System. Table J1 provides the volume and queues for the ten highest volume signalized intersections in the study area.
Refer to Table K2 and the figures in Appendix K for a map showing the geographic location of each intersection.
Table J2 provides source (vehicle loading) and destination information for several roadway segments (links) in the analysis network. Refer to Table K1 and the figures in Appendix K for a map showing the geographic location of each link.
Table J3 provides network-wide statistics (average travel time, average speed and number of vehicles) for an evacuation of the entire EPZ (Region R03) for each scenario. As expected, Scenarios 8 and 11, which are snow scenarios, exhibit the slowest average speed and longest average travel times.
Table J4 provides statistics (average speed and travel time) for the major evacuation routes -
SR 104, SR 250, SR 350 SR 21 and SR 286 - for an evacuation of the entire EPZ (Region R03) under Scenario 1 conditions. As discussed in Section 7.3 and shown in Figures 73 through 77, SR 250 is congested for the first two hours of the evacuation. As such, the average speeds are comparably slower (and travel times longer) than other evacuation routes.
Table J5 provides the cumulative number of vehicles discharged and the cumulative percent of total vehicles discharged for each link exiting the analysis network, for an evacuation of the entire EPZ (Region R03) under Scenario 1 conditions. Refer to Table K1 and the figures in Appendix K for a map showing the geographic location of each link.
Figure J1 through Figure J14 plot the trip generation time versus the ETE for each of the 14 Scenarios considered. The distance between the trip generation and ETE curves is the travel time. Plots of trip generation versus ETE are indicative of the level of traffic congestion during evacuation. For low population density sites, the curves are close together, indicating short travel times and minimal traffic congestion. For higher population density sites, the curves are farther apart indicating longer travel times and the presence of traffic congestion. As seen in Figure J1 through Figure J14, the curves are spatially separated as a result of the traffic congestion in the EPZ, which was discussed in detail in Section 7.3.
R.E. Ginna Nuclear Power Plant                    J1                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
Table J1. Characteristics of the Ten Highest Volume Signalized Intersections Total      Max. Turn Intersection    Approach      Volume          Queue Node            Location                Control      (Up Node)      (Veh)          (Veh) 45        3,042          246 675        1,838            37 46        SR 104 & Ridge Rd            Actuated 673        2,720          151 TOTAL        7,600 978        3,483          291 317        SR 404 & Bay Rd            Actuated        368        3,877          390 TOTAL        7,360 380        6,950            87 455          34              0 381    SR 404 & N Winton Rd            Actuated 811          138            5 TOTAL        7,122 318        1,749          448 377        SR 404 & Plank Rd            Actuated        317        5,108          332 TOTAL        6,857 320        3,892          446 415        2,141            37 321      SR 286 & Blossom Rd            Actuated 443            0              0 TOTAL        6,033 38        3,443            0 928        1,922            0 39        SR 104 & Pound Rd            Actuated        897          295            2 118          97              0 TOTAL        5,757 37        3,130            0 39        1,927            0 38          SR 104 & SR 21            Actuated        896          367            0 186          260            0 TOTAL        5,684 918        2,257            91 SR 441 & 5 Mile Line 159                                    Actuated        424        3,188          226 Rd TOTAL        5,445 317        2,473          384 318      Plank Rd & Creek St          Actuated        376        2,872          163 TOTAL        5,345 440        2,918            0 442            0              0 441    Penfield Rd & East Ave          Actuated 167        2,336            0 TOTAL        5,254 R.E. Ginna Nuclear Power Plant                          J2                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                  Rev. 1
 
Table J2. Sample Simulation Model Input Vehicles Entering Link      Network      Directional    Destination Destination Number    on this Link  Preference        Nodes      Capacity 8061      6,750 258          106              W            8393      1,698 8329      1,698 8004      6,750 596          83              SW            8185      4,500 8839      1,698 8061      6,750 530          248              W            8004      6,750 8189      9,000 8801      1,698 1202          145            SE            8089      1,698 8135      1,698 8630      1,698 157          49              S            8801      1,698 8089      1,698 369          30              S            8089      1,698 673          97              SW            8329      1,698 828          60              SW            8393      1,698 8587      1,698 1000          102              S            8185      4,500 8942      1,698 8004      6,750 1252          54              SW            8185      4,500 8189      9,000 R.E. Ginna Nuclear Power Plant                    J3                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                        Rev. 1
 
Table J3. Selected Model Outputs for the Evacuation of the Entire EPZ (Region R03)
Scenario                          1          2            3        4          5          6          7 NetworkWide Average            2.3        2.7          2.0      2.4        1.9        2.3        2.7 Travel Time (Min/VehMi)
NetworkWide Average            26.4      22.2          30.6      25.2      31.4      25.8      21.9 Speed (mph)
Total Vehicles                83,335    83,192      72,592    72,977    60,432    84,335    84,451 Exiting Network Scenario                          8          9            10        11        12          13        14 NetworkWide Average            3.0        1.9          2.3      2.5        1.9        2.0        2.7 Travel Time (Min/VehMi)
NetworkWide Average            19.9      31.4          26.3      23.8      31.9      29.8      22.4 Speed (mph)
Total Vehicles                84,884    71,964      72,164    72,254    60,237    73,701    83,624 Exiting Network Table J4. Average Speed (mph) and Travel Time (min) for Major Evacuation Routes (Region R03, Scenario 1)
Elapsed Time (hours) 1                    2                    3 Travel Length    Speed      Time                Travel              Travel Route#      (miles)    (mph)      (min)      Speed    Time    Speed      Time SR 104 EB      20.4      43.0      28.4        62.4    19.6      60.7      20.1 SR 104 WB      20.4      23.6      51.8        29.2    41.9      65.3      18.7 SR 250 SB        4.6      19.7      14.1        13.5    20.6      43.9        6.3 SR 350 SB        6.2      21.1      17.6        51.0      7.3      51.8        7.2 SR 21 SB        6.4      43.6        8.8        46.2      8.3      48.1        8.0 SR 286 WB        7.2      45.4        9.5        48.1      9.0      53.4        8.1 R.E. Ginna Nuclear Power Plant                        J4                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                Rev. 1
 
Table J5. Simulation Model Outputs at Network Exit Links for Region R03, Scenario 1 Elapsed Time (hours)
Network                1                          2                              3 Exit Link                Cumulative Vehicles Discharged by the Indicated Time Cumulative Percent of Vehicles Discharged by the Indicated Time 2,565                      7,066                          10,703 5
13%                        12%                            13%
997                      2,327                          3,318 114 5%                        4%                              4%
1,922                      7,864                          9,833 131 10%                        13%                            12%
328                      1,096                          1,287 177 2%                        2%                              2%
408                      1,470                          1,729 180 2%                        2%                              2%
586                      1,956                          2,244 182 3%                        3%                              3%
187                        693                            789 254 1%                        1%                              1%
332                      1,364                          1,705 257 2%                        2%                              2%
5,446                    12,031                          15,778 319 27%                        20%                            19%
4,172                      8,658                          11,671 355 21%                        14%                            14%
624                      2,169                          3,201 584 3%                        4%                              4%
203                      1,214                          1,542 680 1%                        2%                              2%
80                        559                            689 885 0%                        1%                              1%
171                        859                            1,042 903 1%                        1%                              1%
130                        584                            711 952 1%                        1%                              1%
98                      1,310                          2,112 961 0%                        2%                              3%
225                      1,382                          2,068 966 1%                        2%                              3%
1024                202                        643                            778 R.E. Ginna Nuclear Power Plant                      J5                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                Rev. 1
 
Elapsed Time (hours)
Network                1                        2                          3 Exit Link                Cumulative Vehicles Discharged by the Indicated Time Cumulative Percent of Vehicles Discharged by the Indicated Time 1%                        1%                          1%
42                        113                        127 1073 0%                        0%                          0%
524                      1,888                      2,532 1085 3%                        3%                          3%
48                        255                        292 1106 0%                        0%                          0%
101                        477                        753 1287 1%                        1%                          1%
43                        441                        1,476 1288 0%                        1%                          2%
175                      1,304                      1,720 1290 1%                        2%                          2%
264                        818                        1,265 1308 1%                        1%                          2%
285                      1,684                      2,135 1405 1%                        3%                          3%
R.E. Ginna Nuclear Power Plant                    J6                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                          Rev. 1
 
ETE and Trip Generation Summer, Midweek, Midday, Good (Scenario 1)
Trip Generation        ETE 100%
Percent of Total Vehicles 80%
60%
40%
20%
0%
0          30        60        90        120      150        180    210      240      270 Elapsed Time (min)
Figure J1. ETE and Trip Generation: Summer, Midweek, Midday, Good Weather (Scenario 1)
ETE and Trip Generation Summer, Midweek, Midday, Rain (Scenario 2)
Trip Generation        ETE 100%
Percent of Total Vehicles 80%
60%
40%
20%
0%
0          30        60        90        120      150        180    210      240      270 Elapsed Time (min)
Figure J2. ETE and Trip Generation: Summer, Midweek, Midday, Rain (Scenario 2)
R.E. Ginna Nuclear Power Plant                                                  J7                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                        Rev. 1
 
ETE and Trip Generation Summer, Weekend, Midday, Good (Scenario 3)
Trip Generation        ETE 100%
Percent of Total Vehicles 80%
60%
40%
20%
0%
0          30        60        90        120      150        180    210      240      270 Elapsed Time (min)
Figure J3. ETE and Trip Generation: Summer, Weekend, Midday, Good Weather (Scenario 3)
ETE and Trip Generation Summer, Weekend, Midday, Rain (Scenario 4)
Trip Generation        ETE 100%
Percent of Total Vehicles 80%
60%
40%
20%
0%
0          30        60        90        120      150        180    210      240      270 Elapsed Time (min)
Figure J4. ETE and Trip Generation: Summer, Weekend, Midday, Rain (Scenario 4)
R.E. Ginna Nuclear Power Plant                                                  J8                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                        Rev. 1
 
ETE and Trip Generation Summer, Midweek, Weekend, Evening, Good (Scenario 5)
Trip Generation        ETE 100%
Percent of Total Vehicles 80%
60%
40%
20%
0%
0      30        60        90      120      150        180    210      240      270 Elapsed Time (min)
Figure J5. ETE and Trip Generation: Summer, Midweek, Weekend, Evening, Good Weather (Scenario 5)
ETE and Trip Generation Winter, Midweek, Midday, Good (Scenario 6)
Trip Generation        ETE 100%
Percent of Total Vehicles 80%
60%
40%
20%
0%
0      30        60        90      120      150        180    210      240      270 Elapsed Time (min)
Figure J6. ETE and Trip Generation: Winter, Midweek, Midday, Good Weather (Scenario 6)
R.E. Ginna Nuclear Power Plant                                              J9                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                    Rev. 1
 
ETE and Trip Generation Winter, Midweek, Midday, Rain (Scenario 7)
Trip Generation              ETE 100%
Percent of Total Vehicles 80%
60%
40%
20%
0%
0          30        60          90        120          150        180    210        240      270 Elapsed Time (min)
Figure J7. ETE and Trip Generation: Winter, Midweek, Midday, Rain (Scenario 7)
ETE and Trip Generation Winter, Midweek, Midday, Snow (Scenario 8)
Trip Generation              ETE 100%
Percent of Total Vehicles 80%
60%
40%
20%
0%
0        30      60      90        120          150        180    210    240        270      300 Elapsed Time (min)
Figure J8. ETE and Trip Generation: Winter, Midweek, Midday, Snow (Scenario 8)
R.E. Ginna Nuclear Power Plant                                                    J10                                    KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                Rev. 1
 
ETE and Trip Generation Winter, Weekend, Midday, Good (Scenario 9)
Trip Generation        ETE 100%
Percent of Total Vehicles 80%
60%
40%
20%
0%
0      30        60        90        120      150        180    210        240      270 Elapsed Time (min)
Figure J9. ETE and Trip Generation: Winter, Weekend, Midday, Good Weather (Scenario 9)
ETE and Trip Generation Winter, Weekend, Midday, Rain (Scenario 10)
Trip Generation        ETE 100%
Percent of Total Vehicles 80%
60%
40%
20%
0%
0      30        60        90        120      150        180    210        240      270 Elapsed Time (min)
Figure J10. ETE and Trip Generation: Winter, Weekend, Midday, Rain (Scenario 10)
R.E. Ginna Nuclear Power Plant                                              J11                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                      Rev. 1
 
ETE and Trip Generation Winter, Weekend, Midday, Snow (Scenario 11)
Trip Generation            ETE 100%
Percent of Total Vehicles 80%
60%
40%
20%
0%
0        30        60        90        120      150      180        210  240      270      300 Elapsed Time (min)
Figure J11. ETE and Trip Generation: Winter, Weekend, Midday, Snow (Scenario 11)
ETE and Trip Generation Winter, Midweek, Weekend, Evening, Good (Scenario 12)
Trip Generation            ETE 100%
Percent of Total Vehicles 80%
60%
40%
20%
0%
0        30        60        90          120      150        180  210      240      270 Elapsed Time (min)
Figure J12. ETE and Trip Generation: Winter, Midweek, Weekend, Evening, Good Weather (Scenario 12)
R.E. Ginna Nuclear Power Plant                                                                            J12                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                                                  Rev. 1
 
ETE and Trip Generation Summer, Weekend, Midday, Good, Special Event (Scenario 13)
Trip Generation        ETE 100%
Percent of Total Vehicles 80%
60%
40%
20%
0%
0    30    60    90      120      150        180  210      240      270 Elapsed Time (min)
Figure J13. ETE and Trip Generation: Summer, Weekend, Midday, Good Weather, Special Event (Scenario 13)
ETE and Trip Generation Summer, Midweek, Midday, Good, Roadway Impact (Scenario 14)
Trip Generation        ETE 100%
Percent of Total Vehicles 80%
60%
40%
20%
0%
0    30    60    90      120      150        180  210      240      270 Elapsed Time (min)
Figure J14. ETE and Trip Generation: Summer, Midweek, Midday, Good Weather, Roadway Impact (Scenario 14)
R.E. Ginna Nuclear Power Plant                                    J13                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                          Rev. 1
 
APPENDIX K Evacuation Roadway Network
 
K. EVACUATION ROADWAY NETWORK As discussed in Section 1.3, a linknode analysis network was constructed to model the roadway network within the study area. Figure K1 provides an overview of the linknode analysis network. The figure has been divided up into 44 more detailed figures (Figure K2 through Figure K45) which show each of the links and nodes in the network.
The analysis network was calibrated using the observations made during the field survey conducted in February 2012. Table K1 lists the characteristics of each roadway section modeled in the ETE analysis. Each link is identified by its road name and the upstream and downstream node numbers. The geographic location of each link can be observed by referencing the grid map number provided in Table K1. The roadway type identified in Table K1 is generally based on the following criteria:
Freeway: limited access highway, 2 or more lanes in each direction, high free flow speeds Freeway ramp: ramp on to or off of a limited access highway Major arterial: 3 or more lanes in each direction Minor arterial: 2 or more lanes in each direction Collector: single lane in each direction Local roadways: single lane in each direction, local roads with low free flow speeds The term, No. of Lanes in Table K1 identifies the number of lanes that extend throughout the length of the link. Many links have additional lanes on the immediate approach to an intersection (turn pockets); these have been recorded and entered into the input stream for the DYNEV II System.
As discussed in Section 1.3, lane width and shoulder width were not physically measured during the road survey. Rather, estimates of these measures were based on visual observations and recorded images.
Table K2 identifies each node in the network that is controlled and the type of control (stop sign, yield sign, pretimed signal, actuated signal, traffic control point) at that node.
Uncontrolled nodes are not included in Table K2. The location of each node can be observed by referencing the grid map number provided.
R.E. Ginna Nuclear Power Plant                    K1                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K1. Ginna Nuclear Power Plant LinkNode Analysis Network R.E. Ginna Nuclear Power Plant                              K2                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                      Rev. 1
 
Figure K2. LinkNode Analysis Network - Grid 1 R.E. Ginna Nuclear Power Plant                      K3                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Figure K3. LinkNode Analysis Network - Grid 2 R.E. Ginna Nuclear Power Plant                      K4                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Figure K4. LinkNode Analysis Network - Grid 3 R.E. Ginna Nuclear Power Plant                      K5                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Figure K5. LinkNode Analysis Network - Grid 4 R.E. Ginna Nuclear Power Plant                      K6                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Figure K6. LinkNode Analysis Network - Grid 5 R.E. Ginna Nuclear Power Plant                      K7                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Figure K7. LinkNode Analysis Network - Grid 6 R.E. Ginna Nuclear Power Plant                      K8                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Figure K8. LinkNode Analysis Network - Grid 7 R.E. Ginna Nuclear Power Plant                      K9                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Figure K9. LinkNode Analysis Network - Grid 8 R.E. Ginna Nuclear Power Plant                      K10                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Figure K10. LinkNode Analysis Network - Grid 9 R.E. Ginna Nuclear Power Plant                      K11                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K11. LinkNode Analysis Network - Grid 10 R.E. Ginna Nuclear Power Plant                      K12                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K12. LinkNode Analysis Network - Grid 11 R.E. Ginna Nuclear Power Plant                      K13                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K13. LinkNode Analysis Network - Grid 12 R.E. Ginna Nuclear Power Plant                      K14                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K14. LinkNode Analysis Network - Grid 13 R.E. Ginna Nuclear Power Plant                      K15                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K15. LinkNode Analysis Network - Grid 14 R.E. Ginna Nuclear Power Plant                      K16                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K16. LinkNode Analysis Network - Grid 15 R.E. Ginna Nuclear Power Plant                      K17                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K17. LinkNode Analysis Network - Grid 16 R.E. Ginna Nuclear Power Plant                      K18                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K18. LinkNode Analysis Network - Grid 17 R.E. Ginna Nuclear Power Plant                      K19                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K19. LinkNode Analysis Network - Grid 18 R.E. Ginna Nuclear Power Plant                      K20                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K20. LinkNode Analysis Network - Grid 19 R.E. Ginna Nuclear Power Plant                      K21                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K21. LinkNode Analysis Network - Grid 20 R.E. Ginna Nuclear Power Plant                      K22                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K22. LinkNode Analysis Network - Grid 21 R.E. Ginna Nuclear Power Plant                      K23                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K23. LinkNode Analysis Network - Grid 22 R.E. Ginna Nuclear Power Plant                      K24                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K24. LinkNode Analysis Network - Grid 23 R.E. Ginna Nuclear Power Plant                      K25                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K25. LinkNode Analysis Network - Grid 24 R.E. Ginna Nuclear Power Plant                      K26                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K26. LinkNode Analysis Network - Grid 25 R.E. Ginna Nuclear Power Plant                      K27                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K27. LinkNode Analysis Network - Grid 26 R.E. Ginna Nuclear Power Plant                      K28                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K28. LinkNode Analysis Network - Grid 27 R.E. Ginna Nuclear Power Plant                      K29                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K29. LinkNode Analysis Network - Grid 28 R.E. Ginna Nuclear Power Plant                      K30                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K30. LinkNode Analysis Network - Grid 29 R.E. Ginna Nuclear Power Plant                      K31                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K31. LinkNode Analysis Network - Grid 30 R.E. Ginna Nuclear Power Plant                      K32                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K32. LinkNode Analysis Network - Grid 31 R.E. Ginna Nuclear Power Plant                      K33                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K33. LinkNode Analysis Network - Grid 32 R.E. Ginna Nuclear Power Plant                      K34                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K34. LinkNode Analysis Network - Grid 33 R.E. Ginna Nuclear Power Plant                      K35                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K35. LinkNode Analysis Network - Grid 34 R.E. Ginna Nuclear Power Plant                      K36                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K36. LinkNode Analysis Network - Grid 35 R.E. Ginna Nuclear Power Plant                      K37                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K37. LinkNode Analysis Network - Grid 36 R.E. Ginna Nuclear Power Plant                      K38                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K38. LinkNode Analysis Network - Grid 37 R.E. Ginna Nuclear Power Plant                      K39                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K39. LinkNode Analysis Network - Grid 38 R.E. Ginna Nuclear Power Plant                      K40                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K40. LinkNode Analysis Network - Grid 39 R.E. Ginna Nuclear Power Plant                      K41                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K41. LinkNode Analysis Network - Grid 40 R.E. Ginna Nuclear Power Plant                      K42                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K42. LinkNode Analysis Network - Grid 41 R.E. Ginna Nuclear Power Plant                      K43                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K43. LinkNode Analysis Network - Grid 42 R.E. Ginna Nuclear Power Plant                      K44                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K44. LinkNode Analysis Network - Grid 43 R.E. Ginna Nuclear Power Plant                      K45                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Figure K45. LinkNode Analysis Network - Grid 44 R.E. Ginna Nuclear Power Plant                      K46                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
Table K1. Evacuation Roadway Network Characteristics Saturation Free Up      Down                                                        No. Lane Shoulder      Flow    Flow Stream    Stream                                                Length  of    Width    Width    Rate    Speed    Grid Link #    Node      Node        Roadway Name        Roadway Type        (ft.) Lanes (ft.)        (ft.)  (pcphpl) (mph) Number 1        1        525      ST. PAUL BLVD        COLLECTOR              498    1      12        2      1750      40        1 2        2        134      CO RD 221            COLLECTOR              733    1      12        2      1700      55      44 3        3        953      PLANT DRIVEWAY        COLLECTOR            431      1      12        12      1575      35        5 4        4          5      SR 590                FREEWAY              1942    3      12        12      2250      70      31 5        5          4      SR 590                FREEWAY              1942    3      12        12      2250      70      31 6        5          6      SR 590                FREEWAY              1970    3      12        12      2250      70      31 7        6          5      SR 590                FREEWAY              1970    3      12        12      2250      70      31 8        6          7      SR 590                FREEWAY              1677    2      12        12      2250      70      28 9        6        822      I490 ONRAMP        FREEWAY RAMP          1093    2      12        2      1900      55      28 10        7          6      SR 590                FREEWAY              1679    2      12        12      2250      70      28 11        7        825      SR 590                FREEWAY              1325    4      12        12      2250      70      28 SR 590 ONRAMP 12        9        447                            FREEWAY RAMP          861      1      12        2      1750      40      28 FROM BLOSSOM RD 13        9        824      SR 590                FREEWAY              1466    3      12        12      2250      70      28 14        9        863      SR 590                FREEWAY              1290    4      12        12      2250      70      28 15        10        11      SR 590                FREEWAY              4714    3      12        12      2250      70      28 16        10        863      SR 590                FREEWAY              1281    3      12        12      2250      70      28 17        11        10      SR 590                FREEWAY              4714    3      12        12      2250      70      28 18        11        12      SR 590                FREEWAY              1494    3      12        12      2250      70      17 19        12        11      SR 590                FREEWAY              1494    3      12        12      2250      70      17 20        12        13      SR 590                FREEWAY              4578    3      12        12      2250      70      17 21        13        12      SR 590                FREEWAY              4578    3      12        12      2250      70      17 22        13        873      SR 590                FREEWAY              2119    3      12        12      2250      70      17 23        14        15      SR 590                FREEWAY              1496    2      12        12      2250      70      11 SR 590 OFFRAMP TO 24        14        66                            FREEWAY RAMP          1693    2      12        10      1900      55      11 SR 104 R.E. Ginna Nuclear Power Plant                                        K47                                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                          Rev. 1
 
Saturation Free Up      Down                                                  No. Lane Shoulder    Flow    Flow Stream    Stream                                          Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 25        14        873      SR 590            FREEWAY            981    5    12    12      2250      70      17 26        15        14      SR 590            FREEWAY            1496    3    12    12      2250      70      11 27        15        68      SR 590            MINOR ARTERIAL    1301    1    12      4      1700      55      11 SR 590 OFFRAMP TO 28        15        69                          FREEWAY RAMP      1696    1    12    12      1700      55      11 SR 104 29        16        17      SR 104            FREEWAY            6021    3    12      1      2250      65      11 30        16        874      SR 104            FREEWAY            2470    3    12    12      2250      70      11 31        17        16      SR 104            FREEWAY            6021    3    12      1      2250      65      11 32        17        747      SR 104            FREEWAY            3145    3    12    12      2250      70      12 33        18        19      SR 104            FREEWAY            1160    2    12    12      2250      70      13 SR 104 OFFRAMP TO 34        18        418                        FREEWAY RAMP      763    1    12      2      1750      45      13 5 MILE LINE RD 35        18        920      SR 104            FREEWAY            5958    2    12    12      2250      70      13 36        19        18      SR 104            FREEWAY            1160    2    12    12      2250      70      13 37        19        20      SR 104            FREEWAY            5698    2    12    12      2250      70      13 38        20        19      SR 104            FREEWAY            5695    2    12    12      2250      70      13 39        20        21      SR 104            FREEWAY            3840    2    12    12      2250      70      14 40        21        20      SR 104            FREEWAY            3840    2    12    12      2250      70      14 41        21        22      SR 104            FREEWAY            4020    2    12    12      2250      70      14 42        22        21      SR 104            FREEWAY            4015    2    12    12      2250      70      14 43        22        23      SR 104            FREEWAY            5557    2    12    12      2250      70      15 SR 104 OFFRAMP TO 44        22        248                        FREEWAY RAMP      1082    1    12      2      1750      45      14 PHILLIPS RD 45        23        22      SR 104            FREEWAY            5567    2    12    12      2250      70      15 SR 104 OFFRAMP TO 46        23        232                        FREEWAY RAMP      726    1    12      2      1750      50      15 SALT RD 47        23        749      SR 104            MINOR ARTERIAL    1979    2    12    10      1900      65      15 R.E. Ginna Nuclear Power Plant                                  K48                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 48        24        25      SR 104          MINOR ARTERIAL    3212    2    12    10      1750      65      15 49        24        356      BASKET RD      COLLECTOR          482    1    12      2      1700      40      15 50        24        749      SR 104          MINOR ARTERIAL    2272    2    12    10      1900      65      15 51        25        24      SR 104          MINOR ARTERIAL    3212    2    12    10      1750      65      15 52        25        26      SR 104          MINOR ARTERIAL    2813    2    12    10      1750      65      22 53        25        355      SR 404          MINOR ARTERIAL    153    1    12      2      1700      40      15 54        26        25      SR 104          MINOR ARTERIAL    2813    2    12    10      1750      65      22 55        26        27      SR 104          MINOR ARTERIAL    4864    2    12    10      1750      65      22 56        27        26      SR 104          MINOR ARTERIAL    4864    2    12    10      1750      65      22 57        27        28      SR 104          MINOR ARTERIAL    2404    2    12    10      1750      65      22 58        27        142      LINCOLN RD      COLLECTOR          544    1    12      2      1575      35      22 59        28        27      SR 104          MINOR ARTERIAL    2404    2    12    10      1750      65      22 60        28        29      SR 104          MINOR ARTERIAL    3729    2    12    10      1750      65      22 61        28        340      CO RD 102      COLLECTOR          836    1    12      2      1575      35      22 62        29        28      SR 104          MINOR ARTERIAL    3729    2    12    10      1750      65      22 63        29        30      SR 104          MINOR ARTERIAL    4698    2    12    10      1750      65        5 64        29        93      SLOCUM RD      COLLECTOR          1590    1    12      2      1700      45      22 65        30        29      SR 104          MINOR ARTERIAL    4698    2    12    10      1750      65        5 66        30        31      SR 104          MINOR ARTERIAL    5314    2    12    10      1750      65        5 67        30        74      SR 350          MINOR ARTERIAL    457    1    12      2      1750      40      22 68        31        30      SR 104          MINOR ARTERIAL    5314    2    12    10      1750      65        5 69        31        32      SR 104          MINOR ARTERIAL    1122    2    12    10      1750      65      23 70        32        31      SR 104          MINOR ARTERIAL    1122    2    12    10      1750      65      23 71        32        33      SR 104          MINOR ARTERIAL    4311    2    12    10      1750      65        6 WALWORTH 72        32        100                      COLLECTOR          2390    1    12      2      1750      40      23 ONTARIO RD 73        33        32      SR 104          MINOR ARTERIAL    4311    2    12    10      1750      65        6 R.E. Ginna Nuclear Power Plant                              K49                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 74        33        34      SR 104          MINOR ARTERIAL    3769    2    12    10      1900      65        6 75        34        33      SR 104          MINOR ARTERIAL    3769    2    12    10      1750      65        6 76        34        35      SR 104          MINOR ARTERIAL    3129    2    12    10      1900      65        6 77        34        112      FISHER RD      COLLECTOR          3151    1    12      2      1700      55      23 78        35        34      SR 104          MINOR ARTERIAL    3129    2    12    10      1900      65        6 79        35        36      SR 104          MINOR ARTERIAL    5985    2    12    10      1900      65        6 80        36        35      SR 104          MINOR ARTERIAL    5985    2    12    10      1900      65        6 81        36        37      SR 104          MINOR ARTERIAL    4414    2    12    10      1900      65        7 82        36        114      SALMON CREEK RD COLLECTOR          3564    1    12      2      1700      55      23 83        37        36      SR 104          MINOR ARTERIAL    4414    2    12    10      1900      65        7 84        37        38      SR 104          MINOR ARTERIAL    3871    2    12    10      1750      65        7 85        37        776      CO RD 116      COLLECTOR          2824    1    12      2      1700      55        7 86        38        37      SR 104          MINOR ARTERIAL    3871    2    12    10      1900      65        7 87        38        39      SR 104          MINOR ARTERIAL    4119    2    12    10      1750      65        7 88        38        186      SR 21          MINOR ARTERIAL    1860    1    12    12      1700      40        7 89        39        38      SR 104          MINOR ARTERIAL    4119    2    12    10      1750      65        7 90        39        118      POUND RD        COLLECTOR          1170    1    12      2      1700      55        7 91        39        928      SR 104          MINOR ARTERIAL    1158    2    12    10      1900      65        7 92        40        119      E TOWNLINE RD  COLLECTOR          1788    1    12      2      1700      55        7 93        40        778      SR 104          MINOR ARTERIAL    1943    1    12    10      1700      60        7 94        40        928      SR 104          MINOR ARTERIAL    6101    1    12    10      1700      65        7 95        41        42      SR 104          MINOR ARTERIAL    4798    1    12    10      1700      60        8 96        41        122      N CENTENARY RD  COLLECTOR          2544    1    12      2      1700      50        8 97        41        793      SR 104          MINOR ARTERIAL    4462    1    12    10      1700      60        8 98        42        41      SR 104          MINOR ARTERIAL    4798    1    12    10      1700      60        8 99        42        43      SR 104          MINOR ARTERIAL    3742    1    12    10      1700      60        8 R.E. Ginna Nuclear Power Plant                              K50                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 100        43        42      SR 104          MINOR ARTERIAL    3748    1    12    10      1700      60        8 101        43        44      SR 104          MINOR ARTERIAL    4935    1    12    10      1750      60        8 102        43        124      SR 88          MINOR ARTERIAL    599    1    12      2      1750      40        8 103        44        43      SR 104          MINOR ARTERIAL    4950    1    12    10      1700      60        8 104        44        45      SR 104          MINOR ARTERIAL    3947    1    12    10      1700      60        9 105        44        126      MAPLE AVE      COLLECTOR          2600    1    12      2      1750      55        8 106        45        44      SR 104          MINOR ARTERIAL    3961    1    12    10      1750      60        9 107        45        46      SR 104          MINOR ARTERIAL    4663    1    12    10      1750      60        9 108        46        45      SR 104          MINOR ARTERIAL    4663    1    12    10      1700      60        9 109        46        674      RIDGE RD        COLLECTOR          1332    1    12      2      1700      55        9 110        46        675      SR 104          MINOR ARTERIAL    1776    1    12    10      1700      60      26 111        47        48      SR 104          MINOR ARTERIAL    3144    1    12    10      1700      60      26 112        47        675      SR 104          MINOR ARTERIAL    2424    1    12    10      1700      60      26 113        48        47      SR 104          MINOR ARTERIAL    3144    1    12    10      1700      60      26 114        48        49      SR 104          MINOR ARTERIAL    1291    1    12    10      1700      60      26 115        49        48      SR 104          MINOR ARTERIAL    1291    1    12    10      1700      60      26 116        50        51      CULVER RD      COLLECTOR          672    1    12      4      1700      40        2 117        51        52      SEA BREEZE DR  COLLECTOR          3131    1    12      4      1700      50        2 118        51        474      CULVER RD      COLLECTOR          1543    1    12      2      1700      40        2 SEA BREEZE DR 119        52        515                      COLLECTOR          120    1    12      4        900      20        2 TRAFFIC CIRCLE 120        53        54      SEA BREEZE DR  COLLECTOR          997    1    12      4      1700      50        2 SEA BREEZE DR 121        54        808                      COLLECTOR          177    1    12      4        900      20      11 TRAFFIC CIRCLE 122        55        56      SEA BREEZE DR  COLLECTOR          2617    1    12      4      1700      50      11 SEA BREEZE DR 123        56        805                      COLLECTOR          180    1    12      4        900      20      11 TRAFFIC CIRCLE R.E. Ginna Nuclear Power Plant                              K51                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                                  No. Lane Shoulder    Flow    Flow Stream    Stream                                          Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 124        57        58      SEA BREEZE DR      COLLECTOR          1641    1    12      4      1700      50      11 SEA BREEZE DR 125        58        497                        COLLECTOR          144    1    12      4      1125      25      11 TRAFFIC CIRCLE 126        59        60      SR 590            MINOR ARTERIAL    1265    2    12      4      1900      50      11 SR 590 TRAFFIC 127        59        498                        MINOR ARTERIAL    150    1    12      4      1125      25      11 CIRCLE 128        60        59      SR 590            MINOR ARTERIAL    1265    1    12      4      1700      50      11 129        60        68      SR 590            MINOR ARTERIAL    2029    1    12      4      1700      55      11 130        61        62      SR 104            FREEWAY            641    3    12    12      2250      70      16 131        62        61      SR 104            FREEWAY            641    3    12    12      2250      70      16 132        62        63      SR 104            FREEWAY            3149    3    12    12      2250      70      16 133        63        62      SR 104            FREEWAY            3148    3    12    12      2250      70      16 134        63        64      SR 104            FREEWAY            3969    3    12    12      2250      70      16 135        64        63      SR 104            FREEWAY            3969    3    12    12      2250      70      16 136        64        65      SR 104            FREEWAY            4393    3    12    12      2250      70      16 137        65        64      SR 104            FREEWAY            4392    3    12    12      2250      70      16 SR 104 OFFRAMP TO 138        65        482                        FREEWAY RAMP      1044    1    12      2      1700      40      17 CULVER RD 139        65        871      SR 104            FREEWAY            1948    3    12    12      2250      70      17 140        66        871      SR 104            FREEWAY            2266    4    12    12      2250      70      11 SR 104 OFFRAMP TO 141        67        14                          FREEWAY RAMP      1242    2    12    10      1900      55      17 SR 590 SR 104 OFFRAMP TO 142        67        69                          FREEWAY RAMP      2848    2    12    10      1900      55      11 SR 590 143        68        15      SR 590            FREEWAY RAMP      1301    1    12      4      1700      55      11 144        68        60      SR 590            MINOR ARTERIAL    2029    1    12      4      1700      55      11 145        69        16      SR 104            FREEWAY            2080    3    12    12      2250      70      11 R.E. Ginna Nuclear Power Plant                                  K52                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Saturation Free Up      Down                                                  No. Lane Shoulder    Flow    Flow Stream    Stream                                          Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number SR 104 OFFRAMP TO 146        70        15                        FREEWAY RAMP      816    2    12      4      1900      55      11 SR 590 SR 590 OFFRAMP TO 147        70        66                        FREEWAY RAMP      1184    2    12    10      1900      55      11 SR 104 148        71        72      ONTARIO CENTER RD  COLLECTOR          5393    1    12      2      1700      55        5 149        71        209    LAKE RD            COLLECTOR          949    1    12      2      1700      55        5 150        71        211    LAKE RD            COLLECTOR          5046    1    12      2      1700      55        5 151        72        73      ONTARIO CENTER RD  COLLECTOR          6646    1    12      2      1750      55        5 152        73        772    KENYON RD          COLLECTOR          5291    1    12      2      1700      55        5 153        73        890    ONTARIO CENTER RD  COLLECTOR          3748    1    12      2      1700      55        5 154        74        30      SR 350            MINOR ARTERIAL    457    1    12      2      1750      40      22 156        74        774    RIDGE RD          COLLECTOR          5534    1    12      2      1700      45      22 157        74        903    SR 350            MINOR ARTERIAL    6579    1    12      2      1700      55      22 158        75        76      SR 350            MINOR ARTERIAL    5653    1    12      2      1700      55      23 159        76        77      SR 350            MINOR ARTERIAL    7201    1    12      2      1750      55      23 160        76        145    PLANK RD          COLLECTOR        14868    1    12      2      1700      55      22 161        77        78      SR 350            MINOR ARTERIAL    9220    1    12      2      1750      55      36 162        77        146    SR 286            MINOR ARTERIAL    13043    1    12      2      1700      55      35 163        78        105    CO RD 205          COLLECTOR          5421    1    12      2      1750      55      36 WALWORTH 164        78        782                        COLLECTOR          7980    1    12      2      1700      55      35 PENFIELD RD 165        78        1025    SR 350            MINOR ARTERIAL    2795    1    12      4      1700      60      36 166        79        80      SR 350            MINOR ARTERIAL    3320    1    12      2      1700      60      36 167        80        908    BARNES RD          COLLECTOR          6651    1    12      2      1700      45      42 168        80        997    SR 350            MINOR ARTERIAL    4311    1    12      2      1700      55      42 169        81        82      31F                COLLECTOR          682    1    12      2      1750      55      41 R.E. Ginna Nuclear Power Plant                                  K53                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number MACEDON CENTER 170        81        631                      COLLECTOR          1236    1    12      2      1700      55      41 RD 171        82        81      31F            COLLECTOR          681    1    12      2      1700      55      41 172        82        786      31F            COLLECTOR          4897    1    12      2      1750      55      41 173        82        996      SR 350          MINOR ARTERIAL    6353    1    12      2      1700      55      41 174        83        84      SR 350          MINOR ARTERIAL    2230    1    12      2      1750      40      41 175        84        569      SR 31          MINOR ARTERIAL    5034    1    12      2      1700      40      41 176        84        933      SR 31          MINOR ARTERIAL    2083    1    12      2      1700      45      42 177        85        86      SR 31          MINOR ARTERIAL    6270    1    12      2      1700      55      42 178        85        630      CO RD 312      COLLECTOR          4056    1    12      2      1700      50      42 179        86        85      SR 31          MINOR ARTERIAL    6265    1    12      2      1700      55      42 180        86        931      SR 31          MINOR ARTERIAL    3547    1    12      2      1750      55      42 181        87        801      SR 21          MINOR ARTERIAL    2524    1    12      2      1700      55      42 182        87        929      SR 31          MINOR ARTERIAL    573    1    12      2      1750      40      42 183        88        89      SR 31          MINOR ARTERIAL    2414    1    12      2      1700      45      42 184        90        91      SLOCUM RD      COLLECTOR          5077    1    12      2      1700      55        5 185        90        338      LAKE RD        COLLECTOR          3701    1    12      2      1700      55        5 186        90        954      LAKE RD        COLLECTOR          2737    1    12      2      1700      55        5 187        91        72      BRICK CHURCH RD COLLECTOR          5118    1    12      2      1700      55        5 188        91        92      SLOCUM RD      COLLECTOR          6685    1    12      2      1700      55        5 189        92        73      KENYON RD      COLLECTOR          4759    1    12      2      1750      55        5 190        92        889      SLOCUM RD      COLLECTOR          3976    1    12      2      1700      55        5 191        93        29      SLOCUM RD      COLLECTOR          1589    1    12      2      1750      35      22 192        93        94      SLOCUM RD      COLLECTOR          7321    1    12      2      1700      55      22 193        93        340      RIDGE RD        COLLECTOR          3791    1    12      2      1700      50      22 194        93        349      RIDGE RD        COLLECTOR          2490    1    12      2      1700      50      22 195        94        143      WHITNEY RD      COLLECTOR          5947    1    12      2      1700      55      22 R.E. Ginna Nuclear Power Plant                              K54                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 196        94        904      BUSHWOOD RD    COLLECTOR          2540    1    12      2      1700      45      22 197        95        96      SR 110          MINOR ARTERIAL    4973    1    12      2      1700      50        6 198        95        212      LAKE RD        COLLECTOR          4228    1    12      2      1700      55        6 199        96        97      SR 110          MINOR ARTERIAL    2240    1    12      2      1700      45        6 200        97        98      SR 110          MINOR ARTERIAL    2532    1    12      2      1700      50        6 201        98        99      SR 110          MINOR ARTERIAL    4207    1    12      2      1700      55        6 202        99        637      KENYON RD      COLLECTOR          6061    1    12      0      1700      55        6 203        99        892      SR 110          MINOR ARTERIAL    3319    1    12      2      1700      50        6 WALWORTH 204      100        32                      COLLECTOR          2390    1    12      2      1750      40      23 ONTARIO RD WALWORTH 205      100        101                      COLLECTOR          4566    1    12      2      1700      50      23 ONTARIO RD 206      100        112      RIDGE RD        COLLECTOR          8374    1    12      2      1700      50      23 WALWORTH 207      101        102                      COLLECTOR          3523    1    12      2      1700      50      23 ONTARIO RD WALWORTH 208      102        103                      COLLECTOR          4147    1    12      2      1700      50      23 ONTARIO RD WALWORTH 209      103        104                      COLLECTOR        15286    1    12      2      1700      55      36 ONTARIO RD 210      103        654      TUMMONDS RD    COLLECTOR          5811    1    12      2      1700      55      23 WALWORTH 211      104        105                      COLLECTOR          2802    1    12      2      1750      40      36 ONTARIO RD WALWORTH 212      105        662                      COLLECTOR          2454    1    12      2      1700      50      36 MARION RD WALWORTH 213      105        667                      COLLECTOR          2854    1    12      2      1700      50      36 ONTARIO RD WALWORTH 214      106        107                      COLLECTOR          1562    1    12      2      1700      55      36 ONTARIO RD R.E. Ginna Nuclear Power Plant                              K55                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number WALWORTH 215      107        908                      COLLECTOR          3835    1    12      2      1700      55      36 ONTARIO RD MACEDON CENTER 216      108        632                      COLLECTOR          8006    1    12      2      1700      55      42 RD WALWORTH 217      108        993                      COLLECTOR          1790    1    12      2      1575      35      42 ONTARIO RD WALWORTH 218      109        995                      COLLECTOR          3412    1    12      2      1700      50      42 ONTARIO RD 219      110        640      CO RD 120      COLLECTOR          6485    1    12      2      1700      55        7 220      110        641      CO RD 120      COLLECTOR          3053    1    12      2      1700      55        7 221      111        217      LAKE RD        COLLECTOR          1972    1    12      2      1700      50        7 222      111        640      CO RD 120      COLLECTOR          2840    1    12      2      1700      45        7 223      112        34      FISHER RD      COLLECTOR          3151    1    12      2      1700      50      23 224      112        113      RIDGE RD        COLLECTOR          3916    1    12      2      1700      55      23 225      112        651      CO RD 210      COLLECTOR          3863    1    10      2      1700      55      23 226      113        114      RIDGE RD        COLLECTOR          5368    1    12      2      1700      55      23 227      114        36      SALMON CREEK RD COLLECTOR          3564    1    12      2      1700      50      23 228      114        776      CO RD 103      COLLECTOR          4624    1    12      2      1700      55      24 229      115        116      CO RD 103      COLLECTOR          2744    1    12      2      1750      45      24 230      116        117      CO RD 103      COLLECTOR          4499    1    12      2      1700      40      24 231      116        186      SR 21          MINOR ARTERIAL    1419    1    12      2      1700      40      24 232      116        187      SR 21          MINOR ARTERIAL    6072    1    12    12      1700      45      24 233      117        118      CO RD 103      COLLECTOR          1265    1    12      2      1700      55        7 234      118        39      POUND RD        COLLECTOR          1164    1    12      2      1750      40        7 235      118        119      CO RD 103      COLLECTOR          6666    1    12      2      1700      55        7 236      119        40      E TOWNLINE RD  COLLECTOR          1788    1    12      2      1700      45        7 237      119        120      CO RD 103      COLLECTOR          3383    1    12      2      1700      55        7 R.E. Ginna Nuclear Power Plant                              K56                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 238      119        643    E TOWNLINE RD  COLLECTOR          3643    1    12      2      1700      55      24 239      120        121    CO RD 103      COLLECTOR          2908    1    12      2      1700      60        8 240      120        795    TRIPP RD        COLLECTOR          2814    1    12      2      1700      50      25 241      121        122    CO RD 103      COLLECTOR          2745    1    12      2      1700      60        8 242      122        123    CO RD 103      COLLECTOR          4893    1    12      2      1700      55        8 243      123        124    CO RD 103      COLLECTOR          4398    1    12      2      1750      55        8 244      124        43      SR 88          MINOR ARTERIAL    599    1    12      2      1700      40        8 245      124        125    SR 88          MINOR ARTERIAL    2735    1    12      2      1700      40        8 246      125        126    SR 88          MINOR ARTERIAL    1709    1    12      2      1750      40        8 247      125        127    SR 88          MINOR ARTERIAL    3862    1    12      2      1700      40        8 248      126        672    CO RD 103      COLLECTOR          724    1    12      2      1700      40        8 249      127        128    SR 88          MINOR ARTERIAL    9480    1    12      2      1700      55      25 250      128        682    SR 88          MINOR ARTERIAL    2260    1    12      2      1700      65      25 251      128        699    CO RD 241      COLLECTOR          4268    1    12      2      1700      55      25 252      129        130    SR 88          MINOR ARTERIAL    4921    1    12      2      1700      65      25 253      130        131    SR 88          MINOR ARTERIAL    10536    1    12      2      1700      65      38 254      131        132    SR 88          MINOR ARTERIAL    7801    1    12      2      1700      45      38 FAIRVILLE MAPLE 255      132        697                    COLLECTOR          2356    1    12      2      1700      50      38 RIDGE RD 256      132        1003    SR 88          MINOR ARTERIAL    4391    1    12      2      1700      60      44 257      133        134    SR 88          MINOR ARTERIAL    8666    1    12      2      1700      55      44 258      134        135    SR 88          MINOR ARTERIAL    1179    1    12      2      1700      55      44 259      136        137    CO RD 2        COLLECTOR          5178    1    12      2      1700      60        4 260      136        225    LAKE RD        COLLECTOR          3214    1    12      2      1700      55        4 261      137        138    CO RD 2        COLLECTOR          5301    1    12      2      1700      60        4 262      138        227    SCHLEGEL RD    COLLECTOR          3237    1    12      2      1700      55        4 263      138        886    CO RD 100      COLLECTOR          5962    1    12      2      1700      50        4 R.E. Ginna Nuclear Power Plant                              K57                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 264      139        351    RIDGE RD        COLLECTOR          578    1    12      2      1700      55      15 265      139        371    COUNTY LINE RD  COLLECTOR          6827    1    12      2      1700      50      15 266      140        371    COUNTY LINE RD  COLLECTOR          424    1    12      2      1700      55      15 267      140        1007    COUNTY LINE RD  COLLECTOR          3515    1    12      2      1700      55      21 268      141        405    HALEY RD        COLLECTOR          597    1    12      2      1700      55      22 269      142        27      LINCOLN RD      COLLECTOR          544    1    12      2      1750      35      22 270      142        143    CO RD 200      COLLECTOR          7947    1    12      2      1700      55      22 271      142        350    RIDGE RD        COLLECTOR          4704    1    12      2      1700      55      22 272      143        94      WHITNEY RD      COLLECTOR          5947    1    12      2      1700      55      22 273      143        140    WHITNEY RD      COLLECTOR          7806    1    12      2      1700      55      22 274      143        144    CO RD 202      COLLECTOR          3641    1    12      2      1700      55      22 275      144        145    CO RD 202      COLLECTOR          3626    1    12      2      1700      55      22 276      144        405    HALEY RD        COLLECTOR          6771    1    12      2      1700      55      22 277      145        76      PLANK RD        COLLECTOR        14868    1    12      2      1700      55      22 278      145        146    CO RD 202      COLLECTOR          7272    1    12      2      1700      55      22 279      145        404    PLANK RD        COLLECTOR          6984    1    12      2      1700      50      22 280      146        77      SR 286          MINOR ARTERIAL    13043    1    12      2      1750      55      35 281      146        147    CO RD 204      COLLECTOR          4049    1    12      2      1700      50      35 282      146        406    SR 286          MINOR ARTERIAL    8178    1    12      2      1700      55      35 283      147        986    CO RD 204      COLLECTOR          1157    1    12      2      1700      45      35 284      148        149    CO RD 204      COLLECTOR          4974    1    12      2      1700      45      35 285      149        150    SR 441          MINOR ARTERIAL    1841    1    12      2      1700      45      35 WALWORTH 286      149        782                    COLLECTOR          6931    1    12      2      1700      55      35 PENFIELD RD 287      150        151    SR 441          MINOR ARTERIAL    2907    1    12      2      1700      55      35 288      150        615    W WALWORTH RD  COLLECTOR          2439    1    12      2      1700      50      35 289      151        152    SR 441          MINOR ARTERIAL    2838    1    12      2      1750      50      35 R.E. Ginna Nuclear Power Plant                              K58                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                                  No. Lane Shoulder    Flow    Flow Stream    Stream                                          Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 290      152        619      SR 441            MINOR ARTERIAL    538    1    12      2      1700      50      34 291      153        154      SR 441            MINOR ARTERIAL    3306    1    12      2      1700      55      34 292      153        598      CARTER RD          COLLECTOR          8060    1    12      2      1700      55      34 293      154        155      SR 441            MINOR ARTERIAL    4394    1    12      2      1700      55      34 294      155        156      SR 441            MINOR ARTERIAL    1083    2    12      2      1750      55      34 295      156        157      SR 441            MINOR ARTERIAL    2404    2    12      2      1750      55      34 296      156        280      WATSON RD          COLLECTOR          2354    1    12      2      1700      50      34 297      157        272      SR 250            MINOR ARTERIAL    1240    2    12      2      1750      55      34 298      157        911      SR 441            MINOR ARTERIAL    1520    2    12      2      1750      50      34 299      158        592      BAIRD RD          COLLECTOR          2622    1    12      2      1700      55      33 300      158        918      SR 441            MINOR ARTERIAL    1336    2    12      2      1750      55      33 301      159        160      SR 441            MINOR ARTERIAL    2367    2    12      2      1900      55      33 302      159        425      5 MILE LINE RD    COLLECTOR          3196    1    12      2      1750      50      33 303      160        161      SR 441            MINOR ARTERIAL    1912    2    12      2      1900      65      33 304      160        972      PENFIELD RD        COLLECTOR          2236    1    12      2      1700      55      33 305      161        162      SR 441            MINOR ARTERIAL    1562    2    12      2      1900      55      32 SR 441 OFFRAMP TO 306      161        428                        FREEWAY RAMP      871    1    12      2      1750      45      32 SR 153 307      162        163      SR 441            MINOR ARTERIAL    2998    2    12      2      1750      55      32 308      163        813      SR 441            MINOR ARTERIAL    2118    2    12      2      1900      55      32 309      164        817      SR 441            MAJOR ARTERIAL    765    3    12      2      1750      55      32 310      165        166      SR 441            MINOR ARTERIAL    485    2    12      2      1750      40      32 I490 ONRAMP 311      165        176                        FREEWAY RAMP      730    1    12      2      1700      45      32 FROM SR 441 312      166        165      SR 441            MINOR ARTERIAL    485    1    12      2      1750      40      32 313      166        167      SR 441            MINOR ARTERIAL    905    2    12      2      1750      40      32 R.E. Ginna Nuclear Power Plant                                  K59                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Saturation Free Up      Down                                                  No. Lane Shoulder    Flow    Flow Stream    Stream                                          Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name      Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number I490 ONRAMP 314      166        177                        FREEWAY RAMP      736    1    12      2      1700      45      32 FROM SR 441 315      167        166    SR 441              MINOR ARTERIAL    905    2    12      2      1750      40      32 316      167        441    EAST AVE            MINOR ARTERIAL    4376    2    12      2      1750      45      31 317      167        848    SR 96              MINOR ARTERIAL    487    2    12      2      1750      45      32 318      167        1024    ELMWOOD AVE        COLLECTOR          311    2    12      2      1900      40      32 319      169        170    I490              FREEWAY            812    3    12    12      2250      70      28 320      170        169    I490              FREEWAY            812    4    12    12      2250      70      28 321      170        171    I490              FREEWAY            862    4    12    12      2250      70      28 I490 OFFRAMP TO S 322      170        836                        FREEWAY RAMP      479    1    12      2      1900      45      28 WINTON RD 323      171        170    I490              FREEWAY            862    4    12    12      2250      70      28 324      171        172    I490              FREEWAY            1440    3    12    12      2250      70      28 325      171        823    SR 590 ONRAMP      FREEWAY RAMP      778    2    12      2      1900      55      28 326      172        171    I490              FREEWAY            1440    3    12    12      2250      70      28 327      172        173    I490              FREEWAY            698    3    12    12      2250      70      28 328      173        172    I490              FREEWAY            698    4    12    12      2250      70      28 329      173        174    I490              FREEWAY            1471    3    12    12      2250      70      28 330      174        173    I490              FREEWAY            1473    3    12    12      2250      70      28 331      174        175    I490              FREEWAY            1193    3    12    12      2250      70      28 332      174        826    SR 590 ONRAMP      FREEWAY RAMP      774    2    12      2      1900      50      28 333      175        174    I490              FREEWAY            1193    4    12    12      2250      70      28 334      175        176    I490              FREEWAY            4583    3    12    12      2250      70      32 I490 OFFRAMP TO 335      175        440                        FREEWAY RAMP      660    1    12      2      1750      45      31 PENFIELD RD I490 OFFRAMP TO 336      176        166                        FREEWAY RAMP      555    1    12      2      1750      55      32 SR 441 R.E. Ginna Nuclear Power Plant                                  K60                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 337      176        175      I490            FREEWAY            4583    3    12    12      2250      70      32 338      176        177      I490            FREEWAY            1277    3    12    12      2250      70      32 I490 OFFRAMP TO 339      177        165                        FREEWAY RAMP      691    1    12      2      1750      55      32 SR 441 340      177        176      I490            FREEWAY            1281    3    12    12      2250      70      32 341      177        178      I490            FREEWAY            2038    3    12    12      2250      70      32 342      178        177      I490            FREEWAY            2037    3    12    12      2250      70      32 343      178        179      I490            FREEWAY            2332    3    12    12      2250      70      32 344      179        178      I490            FREEWAY            2333    3    12    12      2250      70      32 345      179        180      I490            FREEWAY            1668    3    12    12      2250      70      32 346      180        179      I490            FREEWAY            1672    3    12    12      2250      70      32 347      180        549      I490            FREEWAY            2289    4    12    12      2250      70      32 348      181        549      I490            FREEWAY            1176    3    12    12      2250      70      39 I490 OFFRAMP TO 349      181        553                        FREEWAY RAMP      877    2    12      2      1750      45      39 31F 350      181        988      I490            FREEWAY            3440    3    12    12      2250      70      39 351      182        183      I490            FREEWAY            2991    2    12    12      2250      70      39 352      182        988      I490            FREEWAY            4012    2    12    12      2250      70      39 353      183        182      I490            FREEWAY            2987    2    12    12      2250      70      39 354      183        184      I490            FREEWAY            2975    2    12    12      2250      70      39 355      184        183      I490            FREEWAY            2980    2    12    12      2250      70      39 356      184        185      I490            FREEWAY            2308    2    12    12      2250      70      39 357      185        184      I490            FREEWAY            2308    2    12    12      2250      70      39 358      186        38      SR 21            MINOR ARTERIAL    1859    1    12      2      1750      40        7 359      186        116      SR 21            MINOR ARTERIAL    1419    1    12    12      1750      55      24 360      187        188      SR 21            MINOR ARTERIAL    3570    1    12    12      1700      55      24 361      188        189      SR 21            MINOR ARTERIAL    7960    1    12    12      1700      55      24 R.E. Ginna Nuclear Power Plant                                K61                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 362      189        190      SR 21            MINOR ARTERIAL    7961    1    12      2      1700      50      37 363      190        191      SR 21            MINOR ARTERIAL    2770    1    12      2      1700      45      37 364      190        197      N MAIN ST        COLLECTOR          1352    1    12      2      1700      45      37 365      191        192      SR 21            MINOR ARTERIAL    2221    1    12      2      1750      45      37 366      192        193      SR 21            MINOR ARTERIAL    3180    1    12      2      1700      45      37 367      192        199      BUFFALO ST      COLLECTOR          2191    1    12      2      1750      45      37 368      193        194      SR 21            MINOR ARTERIAL    6499    1    12      2      1700      60      37 369      194        195      SR 21            MINOR ARTERIAL    10982    1    12    12      1700      60      43 370      195        196      SR 21            MINOR ARTERIAL    8215    1    12    12      1700      55      43 371      196        88      SR 21            MINOR ARTERIAL    3064    1    12    12      1750      50      42 372      197        198      N MAIN ST        COLLECTOR          2346    1    10      2      1575      35      37 373      197        649      E WILLIAMSON RD  COLLECTOR          4840    1    12      2      1700      60      37 374      198        199      N MAIN ST        COLLECTOR          1865    1    10      2      1750      35      37 375      199        200      CO RD 216        COLLECTOR          478    1    12      2      1700      40      37 376      200        193      CO RD 216        COLLECTOR          2307    1    12      2      1700      45      37 377      200        201      MILL ST          COLLECTOR          2090    1    12      2      1700      45      37 378      201        202      NEWARK RD        COLLECTOR          7454    1    12      2      1700      55      37 379      202        203      NEWARK MARION RD COLLECTOR          1272    1    12      2      1700      50      37 380      203        204      NEWARK MARION RD COLLECTOR          7310    1    12      2      1700      55      43 381      204        205      NEWARK MARION RD COLLECTOR          3562    1    12      2      1700      55      43 382      205        206      CO RD 221        COLLECTOR          1675    1    12      2      1700      55      43 383      206        207      CO RD 221        COLLECTOR          5153    1    12      2      1700      55      43 384      207        208      CO RD 221        COLLECTOR          6121    1    12      2      1700      55      44 385      208        2      CO RD 221        COLLECTOR          5411    1    12      2      1700      55      44 386      209        71      LAKE RD          COLLECTOR          947    1    12      2      1750      55        5 387      209        954      LAKE RD          COLLECTOR          1428    1    12      2      1700      55        5 R.E. Ginna Nuclear Power Plant                                K62                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 388      210        71      PLANT DRIVEWAY  COLLECTOR          1480    1    12      2      1750      40        5 389      210        209      PLANT DRIVEWAY  COLLECTOR          965    1    12      2      1700      40        5 390      211        95      LAKE RD          COLLECTOR          5217    1    12      2      1700      55        6 391      211        773      KNICKERBOCKER RD COLLECTOR          7417    1    12      2      1700      50        6 392      212        213      LAKE RD          COLLECTOR          6143    1    12      2      1700      55        6 393      212        636      FISHER RD        COLLECTOR          3869    1    12      2      1700      50        6 394      213        214      LAKE RD          COLLECTOR          4172    1    12      2      1700      55        6 STONEY LONESOME 395      213        789                      COLLECTOR        14281    1    12      2      1700      55        6 RD 396      214        215      LAKE RD          COLLECTOR          4128    1    12      2      1700      55        7 397      215        216      LAKE RD          COLLECTOR          3503    1    12      2      1700      45        7 398      216        111      LAKE RD          COLLECTOR          1511    1    12      2      1575      35        7 399      216        790      HAMILTON RD      COLLECTOR          1304    1    12      2      1750      45        7 400      217        218      LAKE RD          COLLECTOR          4274    1    12      2      1700      55        7 401      218        219      LAKE RD          COLLECTOR          4368    1    12      2      1700      55        7 402      219        220      LAKE RD          COLLECTOR          1665    1    12      2      1700      55        7 403      219        642      E TOWNLINE RD    COLLECTOR        12152    1    12      2      1700      50        7 404      220        221      LAKE RD          COLLECTOR          6587    1    12      2      1700      55        8 405      221        222      LAKE RD          COLLECTOR          3255    1    12      2      1700      55        8 406      221        683      N CENTENARY RD  COLLECTOR          8874    1    12      2      1700      45        8 407      222        223      LAKE RD          COLLECTOR          5706    1    12      2      1700      55        8 408      223        224      LAKE RD          COLLECTOR          5233    1    12      2      1700      55        8 409      224        44      MAPLE AVE        COLLECTOR          7522    1    12      2      1750      55        8 410      224        668      LAKE RD          COLLECTOR          3166    1    12      2      1700      55        8 411      225        226      BASKET RD        COLLECTOR          5956    1    12      2      1700      55        4 412      225        228      LAKE RD          COLLECTOR          3411    1    12      2      1700      55        4 413      226        227      BASKET RD        COLLECTOR          4290    1    12      2      1700      55        4 R.E. Ginna Nuclear Power Plant                                K63                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 414      227        230      SCHLEGEL RD      COLLECTOR          3406    1    12      2      1700      55        4 415      227        885      BASKET RD        COLLECTOR          6150    1    12      2      1700      55        4 416      228        229      SALT RD          COLLECTOR          5625    1    12      2      1700      50        4 417      228        239      LAKE RD          COLLECTOR          5232    1    12      2      1700      50        4 418      229        230      SALT RD          COLLECTOR          4362    1    12      2      1700      50        4 419      230        242      SCHLEGEL RD      COLLECTOR          5032    1    12      2      1700      55        4 420      230        760      SALT RD          COLLECTOR          5271    1    12      2      1700      50        4 SR 104 ONRAMP 421      231        23                        FREEWAY RAMP      718    1    12      2      1700      50      15 FROM SALT RD 422      231        232      SALT RD          MINOR ARTERIAL    401    2    12      2      1750      30      15 423      232        231      SALT RD          MINOR ARTERIAL    401    1    12      2      1750      30      15 424      232        233      SALT RD          MINOR ARTERIAL    465    2    12      2      1750      35      15 425      233        232      SALT RD          MINOR ARTERIAL    465    2    12      2      1750      35      15 426      233        234      SALT RD          COLLECTOR          5241    1    12      2      1700      50      15 427      233        357      SR 404          MINOR ARTERIAL    2968    1    12      2      1700      50      15 428      234        235      SALT RD          COLLECTOR          3847    1    12      2      1700      50      15 429      234        334      STATE RD        COLLECTOR          2946    1    12      2      1700      55      15 430      235        236      SALT RD          COLLECTOR          4241    1    12      2      1700      50      21 431      236        237      SALT RD          COLLECTOR          8088    1    10      1      1700      55      21 432      236        335      PLANK RD        COLLECTOR          3009    1    12      2      1700      50      21 433      237        238      SALT RD          COLLECTOR          2551    1    10      1      1750      55      34 434      237        336      SR 286          MINOR ARTERIAL    3145    1    12      2      1700      50      34 435      238        153      SALT RD          COLLECTOR          7965    1    10      1      1750      55      34 436      238        337      SWEET CORNERS RD COLLECTOR          3230    1    10      2      1750      50      34 437      239        240      PHILLIPS RD      COLLECTOR          3232    1    12      2      1700      55        4 438      239        251      LAKE RD          COLLECTOR          3867    1    12      2      1700      55        4 439      240        241      PHILLIPS RD      COLLECTOR          2198    1    12      2      1700      55        4 R.E. Ginna Nuclear Power Plant                                K64                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 440      241        242    PHILLIPS RD      COLLECTOR          3589    1    12      2      1700      55        4 441      242        243    PHILLIPS RD      COLLECTOR          2968    1    12      2      1750      55        4 442      242        256    SCHLEGEL RD      COLLECTOR          2487    1    12      2      1750      50        4 443      243        244    PHILLIPS RD      COLLECTOR          2367    1    12      2      1750      55        4 444      243        950    KLEM RD          COLLECTOR          2087    1    12      2      1700      55        4 445      244        245    PHILLIPS RD      COLLECTOR          1263    1    12      2      1700      55      14 446      244        884    CHIYODA DR      COLLECTOR          1596    1    12      2      1700      40      14 447      245        246    PHILLIPS RD      COLLECTOR          962    1    12      2      1750      55      14 448      246        247    PHILLIPS RD      MINOR ARTERIAL    350    2    12      2      1900      40      14 449      246        883    ORCHARD RD      MINOR ARTERIAL    1595    2    12      2      1750      55      14 450      247        248    PHILLIPS RD      COLLECTOR          448    1    12      2      1750      40      14 SR 104 ONRAMP 451      247        902                      FREEWAY RAMP      591    2    12      2      1900      45      14 FROM PHILLIPS RD 452      248        247    PHILLIPS RD      COLLECTOR          448    1    12      2      1700      40      14 453      248        1002    PHILLIPS RD      COLLECTOR          988    1    12      2      1700      55      14 454      249        264    SR 404          MINOR ARTERIAL    3064    1    12      2      1750      50      14 455      249        1001    PHILLIPS RD      MINOR ARTERIAL    2007    2    12      2      1900      50      14 456      249        1002    PHILLIPS RD      MINOR ARTERIAL    346    2    12      2      1900      40      14 457      250        266    STATE RD        COLLECTOR          3238    1    12      2      1750      50      14 458      251        252    SR 250          MINOR ARTERIAL    1260    1    12      2      1700      50        4 459      251        287    LAKE RD          COLLECTOR          3564    1    12      2      1700      55        4 460      252        253    SR 250          MINOR ARTERIAL    865    1    12      2      1700      50        4 461      253        254    SR 250          MINOR ARTERIAL    3260    1    12      2      1700      50        4 462      254        255    SR 250          MINOR ARTERIAL    2118    1    12      2      1700      50        4 463      255        256    SR 250          MINOR ARTERIAL    1386    1    12      2      1750      50        4 464      256        257    SR 250          MINOR ARTERIAL    2594    1    12      2      1700      50        4 465      257        258    SR 250          MINOR ARTERIAL    388    2    12      2      1750      50        4 R.E. Ginna Nuclear Power Plant                                K65                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                                  No. Lane Shoulder    Flow    Flow Stream    Stream                                          Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 466      258        259    SR 250            MINOR ARTERIAL    367    2    12      2      1900      50        4 467      258        951    KLEM RD            MINOR ARTERIAL    389    2    12      2      1900      50        4 468      259        260    SR 250            MINOR ARTERIAL    2212    1    12      2      1700      50        4 469      260        261    SR 250            MINOR ARTERIAL    2099    1    12      2      1750      50      14 470      261        926    SR 250            MINOR ARTERIAL    978    1    12      2      1575      35      14 471      262        263    SR 250            MINOR ARTERIAL    346    2    12      2      1750      35      14 472      262        757    SR 104 SERVICE RD  MINOR ARTERIAL    1075    2    12      2      1900      55      14 473      263        262    SR 250            MINOR ARTERIAL    346    1    12      2      1750      35      14 474      263        927    SR 250            MINOR ARTERIAL    332    2    12      2      1900      35      14 475      264        358    SR 404            MINOR ARTERIAL    2072    1    12      2      1750      40      14 476      264        770    SR 250            MINOR ARTERIAL    1153    1    12      2      1750      40      14 477      264        927    SR 250            MINOR ARTERIAL    844    1    12      2      1700      40      14 478      265        266    SR 250            MINOR ARTERIAL    2368    1    12      2      1750      50      14 479      266        267    SR 250            MINOR ARTERIAL    6313    1    12      2      1750      50      20 480      266        372    STATE RD          COLLECTOR          3701    1    12      2      1700      50      20 481      267        268    SR 250            MINOR ARTERIAL    5380    1    12      2      1700      55      20 482      267        400    PLANK RD          COLLECTOR          1611    1    12      2      1700      50      20 483      268        269    SR 250            MINOR ARTERIAL    2560    1    12      2      1750      55      34 484      268        999    PENFIELD CENTER RD COLLECTOR          4155    1    12      2      1700      50      34 485      269        270    SR 250            MINOR ARTERIAL    2747    1    12      2      1700      55      34 486      269        408    SR 286            MINOR ARTERIAL    4839    1    12      2      1700      50      34 487      270        271    SR 250            MINOR ARTERIAL    4698    1    12      2      1750      55      34 488      271        910    SR 250            MINOR ARTERIAL    2153    1    12      2      1700      50      34 489      271        1022    WHALEN RD          COLLECTOR          2375    1    12      2      1700      50      34 490      272        157    SR 250            MINOR ARTERIAL    1240    1    12      2      1750      50      34 491      272        273    SR 250            MINOR ARTERIAL    6895    1    12      4      1750      55      34 R.E. Ginna Nuclear Power Plant                                  K66                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 492      273        274      SR 250          MINOR ARTERIAL    1254    1    12      2      1750      35      40 493      273        594      WHITNEY RD W    COLLECTOR          5809    1    12      2      1750      50      39 494      274        275      SR 250          MINOR ARTERIAL    1769    1    12      2      1750      30      40 495      274        282      HIGH ST        COLLECTOR          2676    1    12      2      1750      45      40 496      275        276      SR 250          MINOR ARTERIAL    591    1    12      2      1750      35      40 497      276        565      31F            COLLECTOR          2238    1    12      2      1700      55      40 498      276        947      SR 250          MINOR ARTERIAL    2904    1    12      2      1750      40      40 499      277        567      SR 250          MINOR ARTERIAL    990    2    12      2      1900      50      40 500      277        944      AYRAULT RD      MINOR ARTERIAL    632    2    12      2      1900      45      40 501      278        580      SR 31          MINOR ARTERIAL    487    2    12      2      1750      55      40 502      278        937      SR 250          MINOR ARTERIAL    379    2    12      2      1900      40      40 503      280        156      WATSON RD      COLLECTOR          2354    1    12      2      1750      50      34 504      280        281      WATSON RD      COLLECTOR          5797    1    12      2      1750      50      34 505      281        273      WHITNEY RD E    COLLECTOR          2571    1    12      2      1750      50      40 506      281        282      TURK HILL RD    COLLECTOR          1908    1    12      2      1750      55      40 507      282        274      HIGH ST        COLLECTOR          2676    1    12      2      1750      45      40 508      282        283      TURK HILL RD    COLLECTOR          2283    1    12      2      1750      50      40 509      283        284      TURK HILL RD    COLLECTOR          564    1    12      2      1700      50      40 510      283        566      31F            COLLECTOR          1041    1    12      2      1700      50      40 511      284        945      TURK HILL RD    COLLECTOR          4810    1    12      2      1750      40      40 512      285        943      AYRAULT RD      COLLECTOR          1807    1    12      2      1700      45      40 513      285        955      TURK HILL RD    MINOR ARTERIAL    326    2    12      2      1900      40      40 514      286        579      SR 31          MINOR ARTERIAL    1976    2    12      2      1750      55      40 515      287        288      HOLT RD        COLLECTOR          7706    1    12      2      1700      50        4 516      287        342      LAKE RD        COLLECTOR          3591    1    12      2      1700      45        4 517      288        289      HOLT RD        COLLECTOR          3134    1    12      2      1750      50        4 R.E. Ginna Nuclear Power Plant                              K67                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 518      288        952      SHOEMAKER RD      COLLECTOR          3960    1    12      2      1700      55        3 519      289        295      KLEM RD          COLLECTOR          3925    1    12      2      1750      50        3 520      289        923      HOLT RD          COLLECTOR          4909    1    12      2      1700      45      14 521      290        291      HOLT RD          MINOR ARTERIAL    494    2    12      2      1750      40      14 522      290        755      SR 104 SERVICE RD MINOR ARTERIAL    494    2    12      2      1900      55      14 523      291        290      HOLT RD          COLLECTOR          494    1    12      2      1750      40      14 524      291        292      HOLT RD          MINOR ARTERIAL    526    2    12      2      1750      45      14 525      292        291      HOLT RD          MINOR ARTERIAL    526    2    12      2      1750      45      14 526      292        293      HOLT RD          MINOR ARTERIAL    496    2    12      2      1750      45      14 527      293        292      HOLT RD          MINOR ARTERIAL    496    2    12      2      1750      45      14 528      293        294      HOLT RD          MINOR ARTERIAL    592    1    12      2      1750      45      14 529      294        293      HOLT RD          MINOR ARTERIAL    592    2    12      2      1750      45      14 530      294        359      SR 404            MINOR ARTERIAL    1325    1    12      2      1750      45      14 531      295        296      HARD RD          COLLECTOR          4600    1    12      2      1700      50      13 532      295        303      KLEM RD          COLLECTOR          1756    1    12      2      1700      55        3 533      296        416      PUBLISHERS PKWY  COLLECTOR          3859    1    12      2      1750      40      13 534      296        922      HARD RD          COLLECTOR          986    1    12      2      1700      45      13 535      297        751      HARD RD          MINOR ARTERIAL    362    2    12      2      1750      40      13 536      297        753      SR 104 SERVICE RD MINOR ARTERIAL    2667    2    12      2      1900      55      13 537      298        299      HARD RD          COLLECTOR          809    1    12      2      1750      45      13 538      298        751      HARD RD          COLLECTOR          1028    1    12      2      1750      45      13 539      299        298      HARD RD          COLLECTOR          809    1    12      2      1750      45      13 540      299        360      SR 404            MINOR ARTERIAL    980    1    12      2      1750      45      13 541      299        635      SHOECRAFT RD      COLLECTOR          627    1    12      2      1700      50      13 542      300        301      WHITING RD        COLLECTOR          3671    1    12      2      1700      55        3 543      300        343      LAKE RD          COLLECTOR          4408    1    12      2      1700      45        3 R.E. Ginna Nuclear Power Plant                                K68                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 544      301        302      WHITING RD      COLLECTOR          3286    1    12      2      1700      55        3 545      302        303      WHITING RD      COLLECTOR          2329    1    12      2      1700      55        3 546      302        348      SHOEMAKER RD    COLLECTOR          3195    1    12      2      1700      55        3 547      303        304      KLEM RD        COLLECTOR          957    1    12      2      1700      55        3 548      304        305      KLEM RD        COLLECTOR          1116    1    12      2      1700      55        3 549      305        306      KLEM RD        COLLECTOR          1798    1    12      2      1700      55        3 550      305        416      5 MILE LINE RD  COLLECTOR          4333    1    12      2      1750      50      13 551      306        307      KLEM RD        COLLECTOR          1278    1    12      2      1700      55        3 552      307        308      KLEM RD        COLLECTOR          1100    1    12      2      1700      55        3 553      307        369      GRAVEL RD      COLLECTOR          2613    1    12      2      1700      50        3 554      308        309      KLEM RD        COLLECTOR          743    1    12      2      1700      55        3 555      309        310      KLEM RD        COLLECTOR          597    1    12      2      1700      55        3 556      310        311      KLEM RD        COLLECTOR          1644    1    12      2      1700      55        3 557      311        312      KLEM RD        COLLECTOR          1727    1    12      2      1700      55        3 558      312        313      BAY RD          MINOR ARTERIAL    3073    2    12      2      1900      50        3 559      313        314      BAY RD          MINOR ARTERIAL    3079    2    12      2      1750      50      12 SR 104 ONRAMP 560      314        17                      FREEWAY RAMP      2138    1    12      2      1700      55      12 FROM BAY RD 561      314        315      BAY RD          MINOR ARTERIAL    723    2    12      2      1750      55      12 562      315        314      BAY RD          COLLECTOR          723    1    12      2      1750      55      12 563      315        316      BAY RD          MINOR ARTERIAL    2566    2    12      2      1750      50      12 564      316        315      BAY RD          MINOR ARTERIAL    2563    2    12      2      1750      50      12 565      316        978      BAY RD          COLLECTOR          4972    1    12      2      1750      45      12 566      317        318      CREEK ST        COLLECTOR          2720    1    12      2      1750      45      18 567      317        377      SR 404          MINOR ARTERIAL    2870    2    12      2      1750      50      18 568      318        319      CREEK ST        COLLECTOR          3613    1    12      2      1700      50      18 569      318        377      PLANK RD        COLLECTOR          1504    1    12      2      1750      55      18 R.E. Ginna Nuclear Power Plant                              K69                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 570      319        320      CREEK ST        COLLECTOR          861    1    12      2      1700      50      18 571      320        321      CREEK ST        COLLECTOR          6108    1    12      2      1750      50      29 572      321        322      SR 286          MINOR ARTERIAL    2754    2    12      2      1900      55      29 573      321        443      BLOSSOM RD      COLLECTOR          1910    1    12      2      1700      50      29 574      322        323      SR 286          MINOR ARTERIAL    3463    2    12      2      1900      55      29 575      323        324      SR 286          MINOR ARTERIAL    2748    2    12      2      1750      40      28 576      323        444      N LANDING RD    COLLECTOR          2999    1    12      2      1700      55      29 577      324        325      BANCROFT BLVD  MINOR ARTERIAL    484    2    12      2      1900      40      28 578      325        330      BANCROFT BLVD  MINOR ARTERIAL    269    2    12      2      1900      55      28 SR 590 ONRAMP 579      325        331      FROM BANCROFT  FREEWAY RAMP      385    1    12      2      1575      35      28 BLVD 580      326        327      BANCROFT BLVD  COLLECTOR          1536    1    12      2      1900      40      28 581      326        330      BANCROFT BLVD  MINOR ARTERIAL    619    1    12      2      1900      40      28 582      327        326      BANCROFT BLVD  COLLECTOR          1536    1    12      2      1900      40      28 583      327        450      N WHINTON RD    COLLECTOR          1701    1    12      2      1900      40      28 584      327        866      ATLANTIC AVE    COLLECTOR          3835    1    12      2      1700      40      28 585      328        329      ATLANTIC AVE    COLLECTOR          1209    1    12      2      1700      40      28 586      330        326      BANCROFT BLVD  MINOR ARTERIAL    619    1    12      2      1900      40      28 SR 590 ONRAMP 587      330        331      FROM BANCROFT  FREEWAY RAMP      256    1    12      2      1575      35      28 BLVD SR 590 ONRAMP 588      331        10      FROM BANCROFT  FREEWAY RAMP      739    1    12      2      1575      35      28 BLVD SR 590 ONRAMP 589      331        330      FROM BANCROFT  FREEWAY RAMP      256    1    12      2      1900      35      28 BLVD R.E. Ginna Nuclear Power Plant                              K70                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 590      332        50      CULVER RD        COLLECTOR          5710    1    12      4      1575      35        3 591      332        333      BAY RD          MINOR ARTERIAL    1517    2    12      2      1900      50        3 592      333        312      BAY RD          MINOR ARTERIAL    2474    2    12      2      1900      50        3 593      334        250      STATE RD        COLLECTOR          2037    1    12      2      1750      45      14 594      334        335      HARRIS RD        COLLECTOR          8029    1    12      2      1700      50      21 595      335        336      HARRIS RD        COLLECTOR          8033    1    12      2      1700      50      21 596      335        401      PLANK RD        COLLECTOR          2600    1    12      2      1700      50      20 597      336        269      SR 286          MINOR ARTERIAL    5172    1    12      2      1750      50      34 598      336        337      HARRIS RD        COLLECTOR          2577    1    12      2      1750      50      34 599      337        154      HARRIS RD        COLLECTOR          8519    1    10      1      1700      50      34 600      337        270      SWEET CORNERS RD COLLECTOR          5626    1    10      2      1700      50      34 601      338        341      LAKE RD          COLLECTOR          4453    1    12      2      1700      55        5 602      338        781      CO RD 102        COLLECTOR          5395    1    12      2      1700      55        5 603      339        138      BERG RD          COLLECTOR          9971    1    12      2      1700      55        5 604      339        888      CO RD 102        COLLECTOR          4774    1    12      2      1700      55        5 605      340        28      CO RD 102        COLLECTOR          836    1    12      2      1750      35      22 606      340        142      RIDGE RD        COLLECTOR          2378    1    12      2      1700      55      22 607      341        136      LAKE RD          COLLECTOR          5493    1    12      2      1700      55        5 608      342        300      LAKE RD          COLLECTOR          2457    1    12      2      1700      45        3 609      343        344      LAKE RD          COLLECTOR          1159    1    12      2      1700      40        3 610      344        345      LAKE RD          COLLECTOR          3200    1    12      2      1700      40        3 611      345        346      LAKE RD          COLLECTOR          3242    1    12      2      1700      40        3 612      346        347      LAKE RD          COLLECTOR          1254    1    12      2      1700      40        3 613      347        332      LAKE RD          COLLECTOR          1235    1    12      2      1700      40        3 614      348        306      VAN ALSTYNE RD  COLLECTOR          2120    1    12      2      1700      55        3 615      349        74      RIDGE RD        COLLECTOR          2449    1    12      2      1750      45      22 R.E. Ginna Nuclear Power Plant                                K71                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 616      349        93      RIDGE RD        COLLECTOR          2488    1    12      2      1700      50      22 617      350        139      RIDGE RD        COLLECTOR          2986    1    12      2      1700      50      22 618      351        352      RIDGE RD        COLLECTOR          1995    1    12      2      1700      55      15 619      351        354      COUNTY LINE RD  COLLECTOR          227    1    12      2      1350      30      15 620      352        356      SR 404          MINOR ARTERIAL    652    1    12      2      1700      55      15 621      353        352      SR 404          MINOR ARTERIAL    479    1    12      2      1700      50      15 622      354        353      SR 404          MINOR ARTERIAL    1694    1    12      2      1700      55      15 623      354        355      SR 404          MINOR ARTERIAL    540    1    12      2      1700      40      15 624      355        25      SR 404          MINOR ARTERIAL    153    1    12      2      1750      35      15 625      355        354      SR 404          MINOR ARTERIAL    540    1    12      2      1700      55      15 626      356        24      BASKET RD      COLLECTOR          482    1    12      2      1750      55      15 627      356        233      SR 404          MINOR ARTERIAL    3609    1    12      2      1750      55      15 628      357        249      SR 404          MINOR ARTERIAL    2361    1    12      2      1750      50      14 629      358        766      SR 404          MINOR ARTERIAL    1437    1    12      2      1750      45      14 630      359        299      SR 404          MINOR ARTERIAL    2540    1    12      2      1750      45      13 631      360        361      SR 404          MINOR ARTERIAL    1260    1    12      2      1750      45      13 632      361        362      SR 404          MINOR ARTERIAL    1619    1    12      2      1750      45      13 633      362        363      SR 404          MINOR ARTERIAL    2731    1    12      2      1750      50      13 634      362        419      5 MILE LINE RD  COLLECTOR          2154    1    12      2      1750      45      13 635      362        422      5 MILE LINE RD  COLLECTOR          3836    1    12      2      1700      45      13 636      363        364      SR 404          MINOR ARTERIAL    1979    1    12      2      1750      50      13 637      363        433      HATCH RD        COLLECTOR          2711    1    12      2      1700      50      13 638      364        365      RIDGE RD        COLLECTOR          1091    1    12      2      1750      50      12 639      364        366      SR 404          MINOR ARTERIAL    1984    1    12      2      1700      45      12 640      365        316      RIDGE RD        COLLECTOR          4564    1    12      2      1750      55      12 641      365        364      RIDGE RD        COLLECTOR          1091    1    12      2      1750      50      12 R.E. Ginna Nuclear Power Plant                              K72                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 642      365        366    GRAVEL RD        COLLECTOR          1497    1    12      2      1700      45      12 643      366        367    SR 404          MINOR ARTERIAL    3188    2    12      2      1750      50      18 644      367        368    SR 404          MINOR ARTERIAL    471    2    12      2      1750      50      18 645      368        317    SR 404          MINOR ARTERIAL    667    2    12      2      1750      50      18 646      369        370    GRAVEL RD        COLLECTOR          3208    1    12      2      1700      50      13 647      370        1018    GRAVEL RD        COLLECTOR          1881    1    12      2      1700      50      13 648      371        140    COUNTY LINE RD  COLLECTOR          424    1    12      2      1700      55      15 649      371        234    STATE RD        COLLECTOR          6762    1    12      2      1700      55      15 650      372        373    STATE RD        COLLECTOR          6176    1    12      2      1700      50      20 651      372        399    JACKSON RD      COLLECTOR          2593    1    12      2      1700      55      20 652      373        374    STATE RD        COLLECTOR          2431    1    12      2      1700      50      19 653      373        396    SHOECRAFT RD    COLLECTOR          1423    1    12      2      1700      50      19 654      374        375    PLANK RD        COLLECTOR          1264    1    12      2      1750      50      19 655      375        376    PLANK RD        COLLECTOR          2659    1    12      2      1700      50      19 656      375        411    5 MILE LINE RD  COLLECTOR        10510    1    12      2      1750      55      30 657      376        318    PLANK RD        COLLECTOR          4692    1    12      2      1750      50      18 658      376        434    SCRIBNER RD      COLLECTOR          5342    1    12      2      1700      55      19 659      377        378    SR 404          MINOR ARTERIAL    2652    2    12      4      1900      55      18 660      378        379    SR 404          MINOR ARTERIAL    3070    2    12      4      1900      55      18 661      379        380    SR 404          MINOR ARTERIAL    2371    2    12      4      1900      50      18 662      380        381    SR 404          MINOR ARTERIAL    1922    2    12      4      1750      50      17 663      381        382    SR 404          MINOR ARTERIAL    833    2    12      2      1750      45      17 664      381        455    N WHINTON RD    COLLECTOR          1997    1    12      2      1700      40      17 665      382        383    SR 404          MINOR ARTERIAL    577    2    12      2      1750      40      17 590 ONRAMP FROM 666      383        12                      FREEWAY RAMP      955    1    12      2      1700      45      17 SR 404 667      383        384    SR 404          MINOR ARTERIAL    400    2    12      2      1750      40      17 R.E. Ginna Nuclear Power Plant                                K73                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 668      384        383      SR 404          MINOR ARTERIAL    400    1    12      2      1750      40      17 669      384        385      SR 404          MINOR ARTERIAL    1290    2    12      2      1750      40      17 670      385        384      SR 404          MINOR ARTERIAL    1290    2    12      2      1750      40      17 671      385        386      SR 404          MINOR ARTERIAL    1998    2    12      2      1900      40      17 672      385        462      SHELFORD RD    COLLECTOR          1910    1    12      0      1700      40      17 673      386        387      CLIFFORD AVE    COLLECTOR          826    1    12      2      1900      40      17 674      386        459      CULVER RD      COLLECTOR          1921    1    12      2      1900      40      17 675      386        483      CULVER RD      COLLECTOR          1502    1    12      2      1900      40      17 676      387        388      CLIFFORD AVE    COLLECTOR          2006    1    12      2      1900      40      17 677      388        389      CLIFFORD AVE    COLLECTOR          2206    1    12      2      1900      40      17 678      389        390      CLIFFORD AVE    COLLECTOR          1554    1    12      2      1900      40      16 679      390        391      CLIFFORD AVE    COLLECTOR          738    1    12      2      1900      40      16 680      391        392      CLIFFORD AVE    COLLECTOR          1718    1    12      2      1900      40      16 681      392        393      CLIFFORD AVE    COLLECTOR          845    1    12      2      1700      40      16 682      394        391      COLEMAN TERRACE COLLECTOR          915    1    12      2      1900      40      16 683      395        390      6TH ST          COLLECTOR          911    1    12      2      1900      40      16 684      396        374      PLANK RD        COLLECTOR          2015    1    12      2      1700      50      19 685      397        396      PLANK RD        COLLECTOR          2500    1    12      2      1700      50      19 686      398        397      PLANK RD        COLLECTOR          2550    1    12      2      1700      50      20 687      398        999      JACKSON RD      COLLECTOR          5531    1    12      2      1700      50      20 688      399        398      JACKSON RD      COLLECTOR          2256    1    12      2      1700      50      20 689      400        398      PLANK RD        COLLECTOR          1792    1    12      2      1700      50      20 690      401        267      PLANK RD        COLLECTOR          2461    1    12      2      1750      50      20 691      402        236      PLANK RD        COLLECTOR          3315    1    12      2      1700      50      21 692      403        402      PLANK RD        COLLECTOR          3559    1    12      2      1700      50      21 693      404        403      PLANK RD        COLLECTOR          1153    1    12      2      1700      50      22 R.E. Ginna Nuclear Power Plant                              K74                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 694      404        406    COUNTY LINE RD  COLLECTOR          7373    1    12      2      1700      50      22 695      405        404    COUNTY LINE RD  COLLECTOR          3588    1    12      2      1700      50      22 696      406        407    SR 286          MINOR ARTERIAL    1690    1    12      2      1700      55      35 697      406        982    COUNTY LINE RD  COLLECTOR          5850    1    12      2      1700      50      35 698      407        1020    SR 286          MINOR ARTERIAL    4944    1    12      2      1700      55      34 699      408        409    SR 286          MINOR ARTERIAL    3543    1    12      2      1700      50      30 700      408        1022    JACKSON RD      COLLECTOR          7050    1    12      2      1700      50      34 701      409        410    SR 286          MINOR ARTERIAL    3092    1    12      2      1700      50      30 702      409        590    BAIRD RD        COLLECTOR          6611    1    12      2      1700      55      30 703      410        411    SR 286          MINOR ARTERIAL    1371    1    12      2      1750      50      30 704      411        412    SR 286          MINOR ARTERIAL    2572    1    12      2      1750      55      30 705      411        423    5 MILE LINE RD  COLLECTOR          4049    1    12      2      1750      55      30 706      412        413    SR 286          MINOR ARTERIAL    2119    1    12      2      1700      55      30 707      413        414    SR 286          MINOR ARTERIAL    414    2    12      2      1750      55      29 708      414        415    SR 286          MINOR ARTERIAL    1991    2    12      2      1750      55      29 709      415        321    SR 286          MINOR ARTERIAL    1015    2    12      2      1750      55      29 710      415        971    PANORAMA TRAIL  COLLECTOR          1654    1    12      4      1575      35      29 711      416        296    PUBLISHERS PKWY  COLLECTOR          3859    1    12      2      1700      40      13 712      416        921    5 MILE LINE RD  COLLECTOR          1107    1    12      2      1700      50      13 SR 104 ONRAMP 713      417        18      FROM 5 MILE LINE FREEWAY RAMP      737    1    12      2      1700      45      13 RD 714      417        418    5 MILE LINE RD  MINOR ARTERIAL    302    2    12      2      1750      40      13 715      418        417    5 MILE LINE RD  COLLECTOR          302    1    12      2      1750      40      13 716      418        981    5 MILE LINE RD  MINOR ARTERIAL    443    2    12      2      1900      40      13 717      419        362    5 MILE LINE RD  COLLECTOR          2154    1    12      2      1750      45      13 718      419        981    5 MILE LINE RD  COLLECTOR          526    1    12      2      1700      40      13 R.E. Ginna Nuclear Power Plant                                K75                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 719      420        419      DRIVEWAY        COLLECTOR          415    1    12      2      1750      35      13 720      421        298      DRIVEWAY        COLLECTOR          623    2    12      2      1750      45      13 721      422        375      5 MILE LINE RD  COLLECTOR          4468    1    12      2      1750      50      19 722      423        424      5 MILE LINE RD  COLLECTOR          2224    1    12      2      1750      55      30 723      424        159      5 MILE LINE RD  COLLECTOR          2288    1    12      2      1750      55      33 724      425        432      E LINDEN AVE    COLLECTOR          626    1    12      2      1750      50      33 725      425        595      WHITNEY RD      COLLECTOR          2609    1    12      2      1700      50      33 726      426        435      PENFIELD RD    MINOR ARTERIAL    1027    2    12      2      1750      50      32 727      426        968      PANORAMA TRAIL  MINOR ARTERIAL    519    2    12      2      1750      45      32 728      427        970      PANORAMA TRAIL  COLLECTOR          3153    1    12      2      1700      50      32 SR 441 ONRAMP 729      428        162      FROM PANORAMA  FREEWAY RAMP      747    1    12      2      1700      45      32 TRAIL 730      428        429      PANORAMA TRAIL  MINOR ARTERIAL    320    2    12      2      1750      55      32 731      429        428      PANORAMA TRAIL  COLLECTOR          320    1    12      2      1750      55      32 732      429        430      SR 153          MINOR ARTERIAL    2696    2    12      2      1900      55      33 733      430        429      SR 153          MINOR ARTERIAL    2696    2    12      2      1750      55      33 734      430        431      SR 153          MINOR ARTERIAL    1694    2    12      2      1750      50      33 735      431        539      LINDEN AVE      COLLECTOR          4978    1    12      2      1700      50      32 736      431        540      SR 153          MINOR ARTERIAL    907    2    12      2      1750      40      33 737      432        431      E LINDEN AVE    COLLECTOR          2327    1    12      2      1750      45      33 738      432        589      BLUFF DR        COLLECTOR          923    1    12      2      1700      45      33 739      433        363      HATCH RD        COLLECTOR          2711    1    12      2      1750      50      13 740      433        376      HATCH RD        COLLECTOR          5228    1    12      2      1700      50      19 741      434        412      SCRIBNER RD    COLLECTOR          5201    1    12      2      1750      55      30 742      435        436      PENFIELD RD    MINOR ARTERIAL    584    2    12      2      1900      50      32 743      436        437      PENFIELD RD    COLLECTOR          4838    1    12      2      1700      50      32 R.E. Ginna Nuclear Power Plant                              K76                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                                  No. Lane Shoulder    Flow    Flow Stream    Stream                                          Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 744      437        438      PENFIELD RD        COLLECTOR          3862    1    12      2      1750      50      32 745      438        439      PENFIELD RD        COLLECTOR          1506    1    12      2      1700      50      31 I490 ONRAMP 746      439        175                        FREEWAY RAMP      927    1    12      2      1700      45      31 FROM PENFIELD RD 747      439        440      PENFIELD RD        MINOR ARTERIAL    373    2    12      2      1750      55      31 748      440        441      PENFIELD RD        MINOR ARTERIAL    736    2    12      2      1750      40      31 749      441        167      EAST AVE          MINOR ARTERIAL    4375    2    12      2      1750      45      31 750      441        442      EAST AVE          MINOR ARTERIAL    352    2    12      2      1750      40      31 751      442        441      EAST AVE          MINOR ARTERIAL    352    2    12      2      1750      40      31 752      442        741      CLOVER ST          COLLECTOR          318    1    12      2      1750      40      31 753      442        830      EAST AVE          MINOR ARTERIAL    2318    2    12      2      1750      40      28 754      443        321      BLOSSOM RD        COLLECTOR          1910    1    12      2      1750      50      29 755      443        990      BLOSSOM RD        COLLECTOR          1151    1    12      2      1700      40      29 756      444        445      BLOSSOM RD        COLLECTOR          1819    1    12      2      1750      45      29 757      444        536      N LANDING RD      COLLECTOR          2470    1    12      2      1750      45      29 758      445        858      BLOSSOM RD        COLLECTOR          890    1    12      2      1700      45      28 759      446        447      BLOSSOM RD        MINOR ARTERIAL    386    2    12      2      1750      40      28 SR 590 OFFRAMP TO 760      447        857                        FREEWAY RAMP      1020    1    12      2      1700      45      28 BLOSSOM RD 761      447        862      BLOSSOM RD        MINOR ARTERIAL    596    2    12      2      1900      40      28 762      448        449      BLOSSOM RD        COLLECTOR          1866    1    12      2      1900      40      28 763      449        451      N WHINTON RD      MINOR ARTERIAL    249    2    12      2      1900      40      28 764      450        861      N WHINTON RD      COLLECTOR          929    1    12      2      1700      40      28 765      451        452      N WHINTON RD      MINOR ARTERIAL    927    2    10      2      1900      40      28 766      452        453      N WHINTON RD      MINOR ARTERIAL    390    2    12      2      1900      45      28 767      452        832      UNIVERSITY AVE    MINOR ARTERIAL    875    2    12      2      1900      45      28 768      453        454      N WHINTON RD      MINOR ARTERIAL    156    2    12      2      1900      40      28 R.E. Ginna Nuclear Power Plant                                  K77                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 769      453        833    EAST AVE        MINOR ARTERIAL    888    2    12      2      1900      40      28 I490 ONRAMP 770      454        170                      FREEWAY RAMP      575    1    12      2      1700      55      28 FROM S WINTON RD 771      454        836    S WINTON RD      MINOR ARTERIAL    326    2    12      2      1900      45      28 772      455        381    N WHINTON RD    COLLECTOR          1997    1    12      2      1750      40      17 773      455        456    N WHINTON RD    COLLECTOR          4794    1    12      2      1900      40      28 774      455        1012    CULVER PKWY      COLLECTOR          964    1    12      2      1700      40      17 775      456        326    MERCHANTS RD    COLLECTOR          1437    1    12      2      1900      40      28 776      456        457    N WHINTON RD    COLLECTOR          416    1    12      2      1900      40      28 777      457        327    N WHINTON RD    COLLECTOR          635    1    12      2      1900      40      28 778      458        456    MERCHANTS RD    COLLECTOR          2644    1    10      2      1900      35      28 779      458        1009    WISCONSIN ST    COLLECTOR          381    1    12      2      1700      40      28 780      459        867    CULVER RD        COLLECTOR          195    1    12      2      1900      40      17 781      460        328    CULVER RD        COLLECTOR          1297    1    12      2      1900      40      28 782      461        865    E MAIN ST        COLLECTOR          1096    1    12      2      1900      40      28 783      462        385    SHELFORD RD      COLLECTOR          1910    1    12      0      1750      40      17 784      462        458    SHELFORD RD      COLLECTOR          2964    1    12      0      1900      40      17 785      462        459    CULVER PKWY      COLLECTOR          2197    1    12      2      1900      40      17 786      463        464    NORTON ST        COLLECTOR          252    1    12      2      1700      45      17 787      463        467    NORTON ST        COLLECTOR          1966    1    12      2      1750      45      17 SR 590 ONRAMP 788      464        13                      FREEWAY RAMP      469    1    12      2      1700      50      17 FROM NORTON ST 789      464        463    NORTON ST        COLLECTOR          252    1    12      2      1700      45      17 790      465        464    BAYVIEW RD      COLLECTOR          481    1    12      2      1700      40      17 791      466        465    BAYVIEW RD      COLLECTOR          591    1    12      2      1700      40      17 792      467        463    NORTON ST        COLLECTOR          1966    1    12      2      1700      45      17 793      467        469    NORTON ST        COLLECTOR          2117    1    12      2      1900      45      17 R.E. Ginna Nuclear Power Plant                                K78                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 794      468        467      PARDEE RD        COLLECTOR          1503    1    12      2      1750      40      17 795      469        470      NORTON ST        COLLECTOR          2601    1    12      2      1900      45      17 796      469        483      CULVER RD        COLLECTOR          2994    1    12      2      1900      40      17 797      469        872      CULVER RD        COLLECTOR          1005    1    12      2      1700      45      17 798      470        471      NORTON ST        COLLECTOR          1486    1    12      2      1900      45      16 799      471        472      NORTON ST        COLLECTOR          2089    1    12      2      1900      45      16 800      471        484      N GOODMAN ST      COLLECTOR          2252    1    12      2      1900      45      16 801      471        508      N GOODMAN ST      COLLECTOR          599    1    12      2      1750      45      16 802      472        473      PORTLAND AVE      COLLECTOR          1063    1    12      2      1700      40      16 803      472        509      PORTLAND AVE      MINOR ARTERIAL    2205    2    12      2      1900      40      16 804      473        392      PORTLAND AVE      COLLECTOR          3832    1    12      2      1900      40      16 805      473        472      PORTLAND AVE      COLLECTOR          1063    1    12      2      1900      40      16 806      474        475      CULVER RD        COLLECTOR          2644    1    12      2      1750      40        2 807      475        476      CULVER RD        COLLECTOR          1529    1    12      2      1700      40        2 808      475        516      SWEET FERN RD    COLLECTOR          1543    1    12      2      1700      45        2 809      476        477      CULVER RD        COLLECTOR          3544    1    12      2      1700      40      11 810      477        478      CULVER RD        COLLECTOR          1787    1    12      2      1900      40      11 811      477        805      SENECA RD        COLLECTOR          2740    1    12      2      1700      40      11 812      478        479      CULVER RD        COLLECTOR          1694    1    12      2      1900      40      11 813      478        497      TITUS AVE        COLLECTOR          2681    1    12      2      1700      40      11 814      478        499      TITUS AVE        COLLECTOR          1057    1    12      2      1700      45      11 815      479        876      CULVER RD        COLLECTOR          1057    1    12      2      1700      40      11 816      480        481      CULVER RD        MINOR ARTERIAL    2445    2    12      2      1900      45      11 817      480        493      E RIDGE RD        MINOR ARTERIAL    1551    2    12      2      1750      45      11 818      481        482      CULVER RD        MINOR ARTERIAL    401    2    12      2      1900      45      17 819      481        726      SR 104 SERVICE RD MINOR ARTERIAL    290    2    12      2      1900      40      11 R.E. Ginna Nuclear Power Plant                                K79                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 820      482        481    CULVER RD      COLLECTOR          401    1    12      2      1900      45      17 821      482        872    CULVER RD      MINOR ARTERIAL    1742    2    12      2      1900      45      17 822      483        387    WOODMAN PK      COLLECTOR          1263    1    12      2      1900      40      17 823      483        469    CULVER RD      COLLECTOR          2994    1    12      2      1900      40      17 824      483        485    WARING RD      COLLECTOR          1219    1    12      2      1900      40      17 825      484        389    N GOODMAN ST    COLLECTOR          2022    1    12      2      1900      40      16 826      485        470    WARING RD      COLLECTOR          2784    1    12      2      1900      40      17 827      485        486    NORTHLAND AVE  COLLECTOR          1222    1    12      2      1700      40      17 828      486        388    LYCEUM ST      COLLECTOR          2166    1    12      2      1900      40      17 829      486        484    NORTHLAND AVE  COLLECTOR          2089    1    12      2      1900      40      17 830      486        485    NORTHLAND AVE  COLLECTOR          1222    1    12      2      1900      40      17 831      487        488    E RIDGE RD      COLLECTOR          1319    1    12      2      1700      55      11 832      488        489    E RIDGE RD      COLLECTOR          303    1    12      2      1700      55      11 SR 590 ONRAMP 833      489        68                      FREEWAY RAMP      684    1    12      2      1700      50      11 FROM E RIDGE RD 834      489        490    E RIDGE RD      COLLECTOR          1594    1    12      2      1750      45      11 835      490        491    E RIDGE RD      COLLECTOR          560    1    12      2      1750      45      11 836      491        492    E RIDGE RD      MINOR ARTERIAL    575    2    12      2      1750      45      11 837      492        480    E RIDGE RD      MINOR ARTERIAL    707    2    12      2      1900      45      11 838      493        494    E RIDGE RD      MINOR ARTERIAL    774    2    12      2      1750      45      11 839      494        495    E RIDGE RD      MINOR ARTERIAL    1969    2    12      2      1750      45      10 840      495        504    N GOODMAN ST    MINOR ARTERIAL    424    2    12      2      1750      45      10 841      495        1015    E RIDGE RD      MINOR ARTERIAL    706    2    12      2      1750      45      10 842      496        511    PORTLAND AVE    MINOR ARTERIAL    700    2    12      2      1900      40      10 843      496        717    E RIDGE RD      MINOR ARTERIAL    763    2    12      2      1750      45      10 SEA BREEZE DR 844      497        59                      COLLECTOR          121    1    12      4      1125      25      11 TRAFFIC CIRCLE R.E. Ginna Nuclear Power Plant                              K80                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 845      497        478      TITUS AVE        COLLECTOR          2681    1    12      2      1900      40      11 TITUS AVE EXT 846      498        58                        COLLECTOR          109    1    12      4      1125      25      11 TRAFFIC CIRCLE 847      499        500      TITUS AVE        COLLECTOR          4332    1    12      2      1750      45      11 848      500        501      TITUS AVE        COLLECTOR          1406    1    12      2      1750      45      10 849      500        503      KINGS HWY S      COLLECTOR          2993    1    12      2      1700      40      10 850      501        512      PORTLAND AVE      COLLECTOR          4349    1    12      2      1700      40      10 851      501        514      TITUS AVE        COLLECTOR          3386    1    12      2      1750      45      10 852      502        500      KINGS HWY N      COLLECTOR          2918    1    12      2      1750      35      10 853      503        495      KINGS HWY S      MINOR ARTERIAL    1544    2    12      2      1750      40      10 854      504        505      N GOODMAN ST      MINOR ARTERIAL    445    2    12      2      1750      45      10 855      505        506      N GOODMAN ST      MINOR ARTERIAL    331    2    12      2      1750      45      16 856      505        724      SR 104 SERVICE RD MINOR ARTERIAL    757    2    12      2      1900      55      10 857      506        505      N GOODMAN ST      MINOR ARTERIAL    331    1    12      2      1750      45      16 858      506        507      N GOODMAN ST      MINOR ARTERIAL    652    2    12      2      1900      45      16 859      507        506      N GOODMAN ST      MINOR ARTERIAL    652    2    12      2      1750      45      16 860      507        508      N GOODMAN ST      COLLECTOR          1733    1    12      2      1750      45      16 861      508        471      N GOODMAN ST      COLLECTOR          599    1    12      2      1900      45      16 862      508        507      N GOODMAN ST      COLLECTOR          1733    1    12      2      1700      45      16 863      509        472      PORTLAND AVE      MINOR ARTERIAL    2205    2    12      2      1900      40      16 864      509        510      PORTLAND AVE      MINOR ARTERIAL    479    2    12      2      1900      40      16 865      510        509      PORTLAND AVE      MINOR ARTERIAL    479    2    12      2      1900      40      16 866      510        511      PORTLAND AVE      MINOR ARTERIAL    322    1    12      2      1900      40      16 867      511        510      PORTLAND AVE      MINOR ARTERIAL    322    2    12      2      1900      40      16 868      511        723      SR 104 SERVICE RD MINOR ARTERIAL    2244    2    12      2      1900      55      16 869      512        496      PORTLAND AVE      MINOR ARTERIAL    563    2    12      2      1750      40      10 870      513        501      OAKVIEW DR        COLLECTOR          3745    1    12      2      1750      40      10 R.E. Ginna Nuclear Power Plant                                K81                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 871      514        702      TITUS AVE      COLLECTOR          699    1    12      2      1750      45      10 SEA BREEZE DR 872      515        53                      COLLECTOR          127    1    12      4        900      20        2 TRAFFIC CIRCLE 873      515        475      DURAND BLVD    COLLECTOR          568    1    12      2      1750      40        2 874      516        517      SWEET FERN RD  COLLECTOR          1182    1    12      2      1700      40        2 875      517        518      PINE VALLEY RD  COLLECTOR          1357    1    12      2      1700      50        2 876      518        519      LAKE SHORE BLVD COLLECTOR          1338    1    12      2      1700      45        2 877      519        520      LAKE SHORE BLVD COLLECTOR          2692    1    12      2      1700      50        2 878      520        521      LAKE SHORE BLVD COLLECTOR          2880    1    12      2      1700      50        2 879      521        522      LAKE SHORE BLVD COLLECTOR          395    1    12      2      1700      50        1 880      522        523      LAKE SHORE BLVD COLLECTOR          4665    1    12      2      1700      45        1 881      523        1      LAKE SHORE BLVD COLLECTOR          710    1    12      2      1750      45        1 882      524        520      KINGS HWY N    COLLECTOR          1399    1    12      2      1575      35        2 883      525        527      PATTONWOOD DR  COLLECTOR          2312    1    12      2      1750      40        1 884      526        525      ST. PAUL BLVD  COLLECTOR          1565    1    12      2      1750      40        1 885      527        528      PATTONWOOD DR  MINOR ARTERIAL    664    2    12      2      1750      40        1 886      528        529      PATTONWOOD DR  MINOR ARTERIAL    1123    2    12      2      1900      40        1 887      530        531      THOMAS AVE      COLLECTOR          4173    1    12      2      1700      40        1 888      530        532      ST PAUL BLVD    MINOR ARTERIAL    1602    2    10      4      1900      45        1 889      531        528      THOMAS AVE      COLLECTOR          3495    1    12      2      1750      40        1 890      532        530      ST PAUL BLVD    COLLECTOR          1602    1    10      4      1750      45        1 891      532        703      ST PAUL BLVD    MINOR ARTERIAL    1313    2    10      4      1900      45      10 892      533        532      PINEGROVE AVE  COLLECTOR          1705    1    12      2      1700      40        1 893      534        1      ST PAUL BLVD    COLLECTOR          2790    1    12      2      1750      45        1 894      534        881      ST PAUL BLVD    COLLECTOR          2614    1    12      2      1700      45        1 895      535        534      COLEBROOK DR    COLLECTOR          690    1    12      2      1750      40        1 896      536        438      N LANDING RD    COLLECTOR          1812    1    12      2      1750      45      29 R.E. Ginna Nuclear Power Plant                              K82                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 897      537        445      CLOVER ST      COLLECTOR          1172    1    12      2      1750      40      28 898      538        445      CLOVER ST      COLLECTOR          2606    1    12      2      1750      40      28 899      539        163      LINDEN AVE      COLLECTOR          1031    1    12      2      1750      45      32 900      540        541      SR 153          MINOR ARTERIAL    1081    2    12      2      1750      40      33 901      541        542      SR 153          MINOR ARTERIAL    2582    1    12      2      1700      50      32 902      541        546      W COMMERCIAL ST MINOR ARTERIAL    2454    2    12      2      1750      50      32 903      542        543      SR 153          MINOR ARTERIAL    790    1    12      2      1750      45      39 904      543        544      SR 153          MINOR ARTERIAL    1298    1    12      2      1700      50      39 905      543        552      31F            MINOR ARTERIAL    882    2    12      2      1750      55      39 906      545        541      W COMMERCIAL ST COLLECTOR          723    1    12      2      1750      35      33 907      546        547      W COMMERCIAL ST MINOR ARTERIAL    1626    2    12      2      1900      55      32 I490 ONRAMP 908      547        548      FROM W          FREEWAY RAMP      1038    1    12      2      1700      55      32 COMMERCIAL ST 909      547        556      I490 ACCESS RD FREEWAY RAMP      611    1    12      2      1700      55      32 I490 ONRAMP 910      548        550      FROM W          FREEWAY RAMP      593    1    12      2      1700      40      32 COMMERCIAL ST 911      549        180      I490          FREEWAY            2293    3    12    12      2250      70      32 912      549        181      I490          FREEWAY            1176    3    12    12      2250      70      39 I490 ONRAMP 913      550        180      FROM W          FREEWAY RAMP      542    1    12      2      1700      40      32 COMMERCIAL ST 914      551        546      ROOSEVELT RD    COLLECTOR          862    1    12      2      1750      50      32 915      551        552      ROOSEVELT RD    COLLECTOR          2093    1    12      2      1750      40      32 916      552        553      31F            MINOR ARTERIAL    1030    2    12      2      1750      50      39 917      553        554      31F            MINOR ARTERIAL    1141    2    12      2      1900      45      32 R.E. Ginna Nuclear Power Plant                              K83                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 918      553        557      I490 ACCESS RD MINOR ARTERIAL    1827    2    12      2      1900      55      32 I490 ONRAMP 919      554        181                      FREEWAY RAMP      1700    1    12      2      1700      45      32 FROM 31F 920      554        553      31F            MINOR ARTERIAL    1141    1    12      2      1750      45      32 921      554        844      31F            MINOR ARTERIAL    675    2    12      2      1750      45      32 922      555        561      31F            MINOR ARTERIAL    633    2    12      2      1750      50      39 923      555        588      MARSH RD        COLLECTOR          3669    1    12      2      1700      45      39 924      556        558      I490 ACCESS RD COLLECTOR          1071    1    12      2      1700      50      32 925      557        556      I490 ACCESS RD COLLECTOR          803    1    12      2      1700      55      32 926      558        179      I490 ONRAMP  FREEWAY RAMP      773    1    12      2      1700      45      32 927      559        543      31F            MINOR ARTERIAL    1511    2    12      2      1750      50      39 928      560        559      31F            MINOR ARTERIAL    1596    2    12      2      1750      50      39 929      561        560      31F            MINOR ARTERIAL    1729    2    12      2      1750      55      39 930      562        555      31F            MINOR ARTERIAL    3300    2    12      2      1750      50      39 931      563        562      31F            MINOR ARTERIAL    709    2    12      2      1750      50      39 932      563        957      31F            MAJOR ARTERIAL    566    2    12      2      1900      50      39 933      564        956      JEFFERSON AVE  COLLECTOR          813    1    12      2      1700      40      39 934      564        957      31F            MINOR ARTERIAL    546    1    12      2      1700      50      39 935      565        564      31F            COLLECTOR          3187    1    12      2      1750      50      39 936      566        276      31F            COLLECTOR          1573    1    12      2      1750      50      40 937      566        283      31F            COLLECTOR          1042    1    12      2      1750      50      40 938      567        939      SR 250          MINOR ARTERIAL    1680    1    12      2      1700      50      40 939      568        277      SR 250          MINOR ARTERIAL    959    2    12      2      1750      40      40 940      569        84      SR 31          MINOR ARTERIAL    5036    1    12      2      1750      40      41 941      569        570      SR 31          MINOR ARTERIAL    1338    1    12      2      1750      50      41 942      569        628      VICTOR RD      COLLECTOR          2035    1    12      2      1700      50      41 943      570        569      SR 31          MINOR ARTERIAL    1338    1    12      2      1700      50      41 R.E. Ginna Nuclear Power Plant                              K84                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 944      570        571      SR 31          MINOR ARTERIAL    9645    1    12      8      1750      50      41 945      570        628      CANANDAIGUA RD  COLLECTOR          1479    1    12      2      1700      50      41 946      571        570      SR 31          MINOR ARTERIAL    9645    1    12      8      1750      50      41 947      571        572      SR 31          MINOR ARTERIAL    1377    1    12      2      1750      50      41 948      572        571      SR 31          MINOR ARTERIAL    1377    1    12      2      1750      50      41 949      572        573      SR 31          MINOR ARTERIAL    2819    1    12      2      1700      55      41 950      573        574      SR 31          MINOR ARTERIAL    5417    1    12      2      1700      55      40 951      574        575      SR 31          MINOR ARTERIAL    1295    1    12      2      1750      55      40 952      575        576      SR 31          MINOR ARTERIAL    2793    1    12      2      1750      50      40 953      575        627      VICTOR RD      COLLECTOR          2914    1    12      2      1700      50      40 954      576        575      SR 31          MINOR ARTERIAL    2792    1    12      2      1750      50      40 955      576        577      SR 31          MINOR ARTERIAL    4759    1    12      2      1700      50      40 956      577        578      SR 31          MINOR ARTERIAL    1061    1    12      2      1700      55      40 957      578        286      SR 31          MINOR ARTERIAL    1188    2    12      2      1750      55      40 958      579        278      SR 31          MINOR ARTERIAL    782    2    12      2      1750      55      40 959      580        581      SR 31          MINOR ARTERIAL    970    2    12      2      1750      55      40 960      581        582      SR 31          MINOR ARTERIAL    3787    2    12      2      1750      55      39 961      582        583      SR 31          MINOR ARTERIAL    4558    2    12      2      1750      55      39 962      582        942      KREAG RD        COLLECTOR          1115    1    12      2      1700      40      39 963      583        584      SR 31          MINOR ARTERIAL    1874    2    12      2      1900      55      39 964      584        585      SR 31          MINOR ARTERIAL    616    2    12      2      1900      50      39 I490 ONRAMP 965      585        744                      FREEWAY RAMP      592    1    12      2      1700      40      39 FROM SR 31 966      585        987      SR 31          MINOR ARTERIAL    240    2    12      2      1900      45      39 967      586        587      SR 31          MINOR ARTERIAL    1622    1    12      2      1700      45      39 968      586        987      SR 31          MINOR ARTERIAL    1966    1    12      2      1700      45      39 969      588        586      MARSH RD        COLLECTOR          5006    1    12      2      1750      45      39 R.E. Ginna Nuclear Power Plant                              K85                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 970      589        432      BLUFF DR        COLLECTOR          922    1    12      2      1750      45      33 971      589        960      S LINCOLN RD    COLLECTOR          2528    1    12      2      1750      40      33 972      590        158      BAIRD RD        COLLECTOR          4025    1    12      2      1750      55      33 973      590        423      WHALEN RD      COLLECTOR          3194    1    12      2      1750      50      30 974      591        271      WHALEN RD      COLLECTOR          1691    1    12      2      1750      55      34 975      592        593      BAIRD RD        COLLECTOR          813    1    12      2      1700      55      33 976      593        594      BAIRD RD        COLLECTOR          4721    1    12      2      1750      55      33 977      594        563      BAIRD RD        COLLECTOR          2855    1    12      2      1750      40      39 978      595        425      WHITNEY RD      COLLECTOR          2617    1    12      2      1750      50      33 979      595        594      WHITNEY RD      COLLECTOR          2775    1    12      2      1750      50      33 980      596        597      WHITNEY RD E    COLLECTOR          6588    1    12      2      1700      50      40 MONROEWAYNE 981      596        602                      COLLECTOR          4773    1    12      0      1700      55      41 COUNTY LINE RD 982      597        598      WHITNEY RD E    COLLECTOR          1275    1    12      2      1700      50      40 983      597        603      HOWELL RD      COLLECTOR          5247    1    12      2      1700      55      40 984      598        281      WHITNEY RD E    COLLECTOR          7975    1    12      2      1750      50      40 985      599        79      EDDY RD        COLLECTOR          2852    1    12      2      1700      50      35 986      599        82      WIEKRICK RD    COLLECTOR          7974    1    12      2      1750      55      41 987      599        907      EDDY RD        COLLECTOR          4713    1    12      2      1700      50      35 988      600        601      31F            COLLECTOR          2790    1    12      2      1700      50      41 989      600        623      W WALWORTH RD  COLLECTOR          2758    1    12      2      1700      50      41 990      600        786      31F            COLLECTOR          8408    1    12      2      1750      55      41 991      601        602      31F            COLLECTOR          2827    1    12      2      1700      50      41 992      602        621      31F            COLLECTOR          5388    1    12      2      1700      55      40 993      603        604      31F            COLLECTOR          1563    1    12      2      1750      55      40 994      604        605      31F            COLLECTOR          4092    1    12      2      1700      55      40 995      604        612      LYNDON RD      COLLECTOR          2219    1    12      4      1700      50      40 R.E. Ginna Nuclear Power Plant                              K86                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 996      605        282      31F            COLLECTOR          4997    1    12      2      1750      55      40 997      606        583      AYRAULT RD      COLLECTOR          4050    1    12      2      1750      45      39 998      606        607      AYRAULT RD      COLLECTOR          1358    1    12      2      1700      45      39 999      607        582      KREAG RD        COLLECTOR          2108    1    12      2      1750      40      39 1000      607        606      AYRAULT RD      COLLECTOR          1358    1    12      2      1750      45      39 1001      608        285      AYRAULT RD      COLLECTOR          4906    1    12      2      1750      50      40 1002      609        608      DRIVEWAY        COLLECTOR          1130    1    12      2      1750      40      40 1003      610        614      AYRAULT RD      COLLECTOR          1432    1    12      2      1700      40      40 1004      611        574      ALDRICH RD      COLLECTOR          5449    1    12      2      1700      40      40 1005      611        610      AYRAULT RD      COLLECTOR          2628    1    12      2      1700      40      40 1006      612        613      LYNDON RD      COLLECTOR          548    1    10      4      1700      50      40 1007      613        610      LYNDON RD      COLLECTOR          2643    1    12      4      1700      50      40 1008      614        576      MASON RD        COLLECTOR          5441    1    12      2      1750      40      40 1009      614        608      AYRAULT RD      COLLECTOR          1709    1    12      2      1750      40      40 1010      615        600      W WALWORTH RD  COLLECTOR        12415    1    12      2      1700      50      41 1011      615        616      GANANDA PKWY    COLLECTOR          1953    1    12      2      1700      50      35 1012      616        618      GANANDA PKWY    COLLECTOR          2545    1    12      2      1700      50      35 1013      617        615      GANANDA PKWY    COLLECTOR          1976    1    12      2      1700      55      35 1014      618        152      GANANDA PKWY    COLLECTOR          1142    1    12      2      1750      45      35 MONROEWAYNE 1015      619        620                      COLLECTOR          1331    1    12      2      1700      45      34 COUNTY LINE RD 1016      619        984      SR 441          MINOR ARTERIAL    607    1    12      2      1700      55      34 MONROEWAYNE 1017      620        596                      COLLECTOR          6843    1    12      0      1700      50      35 COUNTY LINE RD 1018      621        603      31F            COLLECTOR          1350    1    12      2      1700      55      40 1019      622        621      PERINTON PKWY  COLLECTOR          1901    1    12      2      1700      45      40 1020      623        624      QUAKER RD      COLLECTOR          2638    1    12      2      1700      55      41 R.E. Ginna Nuclear Power Plant                              K87                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1021      624        625      CO RD 206      COLLECTOR          3332    1    12      2      1700      50      41 1022      625        626      CO RD 206      COLLECTOR          984    1    12      2      1125      25      41 1023      626        572      CO RD 206      COLLECTOR          3737    1    12      2      1750      50      41 1024      627        575      VICTOR RD      COLLECTOR          2914    1    12      2      1750      50      40 1025      628        629      CANANDAIGUA RD  COLLECTOR          2296    1    12      2      1700      50      41 MACEDON CENTER 1026      631        108                      COLLECTOR          7296    1    12      2      1700      55      42 RD 1027      632        991      CO RD 210      COLLECTOR          1629    1    12      2      1700      50      42 1028      633        243      CARACUS DR      COLLECTOR          1130    1    12      2      1750      40        4 1029      633        758      RESENDE RD      COLLECTOR          2216    1    12      2      1750      40        4 1030      634        289      KLEM RD        COLLECTOR          1322    1    12      2      1750      55        4 1031      635        299      SHOECRAFT RD    COLLECTOR          628    1    12      2      1750      50      13 1032      635        373      SHOECRAFT RD    COLLECTOR          7649    1    12      2      1700      50      19 1033      636        637      FISHER RD      COLLECTOR          9444    1    12      2      1700      55        6 1034      637        789      CO RD 113      COLLECTOR          6105    1    12      0      1700      55        6 1035      637        893      FISHER RD      COLLECTOR          3052    1    12      2      1700      55        6 1036      638        777      WOODS RD        COLLECTOR          4409    1    12      0      1700      55        7 1037      638        894      SALMON CREEK RD COLLECTOR          2710    1    12      2      1700      55        6 1038      639        638      SALMON CREEK RD COLLECTOR          2253    1    12      2      1700      50        6 1039      640        110      CO RD 120      COLLECTOR          6486    1    12      2      1700      55        7 1040      640        111      CO RD 120      COLLECTOR          2846    1    12      2      1700      45        7 1041      640        790      HAMILTON RD    COLLECTOR          844    1    12      2      1750      45        7 1042      641        896      CO RD 120      COLLECTOR          4460    1    12      2      1700      50        7 1043      641        897      POUND RD        COLLECTOR          5824    1    12      2      1700      55        7 1044      642        898      E TOWNLINE RD  COLLECTOR          4572    1    12      2      1700      50        7 1045      643        644      E TOWNLINE RD  COLLECTOR          7866    1    12      2      1700      55      24 1046      644        645      E WILLIAMSON RD COLLECTOR          1649    1    12      2      1700      50      24 R.E. Ginna Nuclear Power Plant                              K88                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1047      645        646    E WILLIAMSON RD COLLECTOR          2167    1    12      2      1700      50      24 1048      646        647    E WILLIAMSON RD COLLECTOR          4934    1    12      2      1700      55      24 1049      646        1006    BEAM HILL RD    COLLECTOR          1318    1    12      2      1700      55      24 1050      647        648    E WILLIAMSON RD COLLECTOR          3888    1    12      2      1700      55      24 1051      648        649    E WILLIAMSON RD COLLECTOR          5152    1    12      2      1700      50      37 1052      649        650    E WILLIAMSON RD COLLECTOR          1304    1    12      2      1700      55      37 1053      650        692    SKINNER RD      COLLECTOR          7123    1    12      2      1700      55      37 1054      651        652    CO RD 210      COLLECTOR          3069    1    10      2      1700      55      23 1055      652        653    CO RD 210      COLLECTOR          1477    1    10      2      1700      55      23 1056      653        654    CO RD 210      COLLECTOR          3768    1    10      2      1700      55      23 1057      654        655    CO RD 210      COLLECTOR          2680    1    10      2      1700      55      23 1058      655        656    CO RD 210      COLLECTOR          492    1    12      2      1350      30      23 1059      656        657    CO RD 210      COLLECTOR          6097    1    10      2      1700      45      23 1060      657        658    CO RD 210      COLLECTOR          5540    1    10      2      1700      45      36 1061      658        659    CO RD 210      COLLECTOR          3141    1    10      2      1700      45      36 WALWORTH 1062      659        664                    COLLECTOR          2216    1    12      2      1700      55      36 MARION RD 1063      659        1026    CO RD 210      COLLECTOR          2711    1    12      2      1700      55      36 1064      660        632    CO RD 210      COLLECTOR          8799    1    12      2      1700      55      42 1065      661        87      CO RD 210      COLLECTOR          2053    1    12      2      1750      40      42 WALWORTH 1066      662        663                    COLLECTOR          2995    1    12      2      1700      55      36 MARION RD WALWORTH 1067      663        659                    COLLECTOR          1100    1    12      2      1700      55      36 MARION RD WALWORTH 1068      664        665                    COLLECTOR          5151    1    12      2      1700      55      36 MARION RD R.E. Ginna Nuclear Power Plant                              K89                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number WALWORTH 1069      665        666                    COLLECTOR          2888    1    12      2      1700      50      36 MARION RD WALWORTH 1070      666        796                    COLLECTOR          3209    1    12      2      1700      50      37 MARION RD WALWORTH 1071      667        106                    COLLECTOR          3222    1    12      2      1700      55      36 ONTARIO RD 1072      668        669    LAKE RD        COLLECTOR          5337    1    12      2      1700      55        9 1073      669        670    LAKE RD        COLLECTOR          4907    1    12      2      1700      55        9 1074      670        671    LAKE RD        COLLECTOR          1806    1    12      2      1700      55        9 1075      672        45      CO RD 103      COLLECTOR          2529    1    12      2      1700      45        9 1076      672        673    RIDGE RD        COLLECTOR          4514    1    12      2      1700      55        9 1077      673        46      RIDGE RD        COLLECTOR          2198    1    12      2      1750      55        9 1078      674        675    BURLEE RD      COLLECTOR          789    1    12      2      1700      40      26 1079      674        677    RIDGE RD        COLLECTOR          2746    1    12      2      1700      55      26 1080      675        46      SR 104          MINOR ARTERIAL    1777    1    12    10      1750      60      26 1081      675        47      SR 104          MINOR ARTERIAL    2417    1    12    10      1700      60      26 1082      676        674    KELLY RD        COLLECTOR          3625    1    12      2      1700      55        9 1083      677        47      BARCLAY RD      COLLECTOR          788    1    12      2      1700      40      26 1084      677        678    RIDGE RD        COLLECTOR          2817    1    12      2      1700      55      26 1085      678        48      CO RD 140      COLLECTOR          791    1    12      2      1700      40      26 1086      678        679    RIDGE RD        COLLECTOR          1599    1    12      2      1700      55      26 1087      680        675    BURLEE RD      COLLECTOR          911    1    12      2      1700      40      26 1088      681        47      BARCLAY RD      COLLECTOR          1915    1    12      2      1700      40      26 1089      682        129    SR 88          MINOR ARTERIAL    6800    1    12      2      1700      65      25 1090      683        899    N CENTENARY RD  COLLECTOR          3922    1    12      2      1700      45        8 1091      684        1005    CO RD 215      COLLECTOR          2927    1    12      2      1700      55      24 1092      685        686    CO RD 215      COLLECTOR          2457    1    12      2      1700      55      38 R.E. Ginna Nuclear Power Plant                              K90                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1093      686        687      MINSTEED RD    COLLECTOR          7346    1    12      2      1700      55      38 1094      687        688      MINSTEED RD    COLLECTOR          3130    1    12      2      1700      55      38 1095      687        694      MARTIN RD      COLLECTOR          3178    1    12      2      1700      55      38 1096      688        689      MINSTEED RD    COLLECTOR          1619    1    12      2      1700      50      38 1097      689        690      MINSTEED RD    COLLECTOR          9221    1    12      2      1700      55      38 1098      690        691      MINSTEED RD    COLLECTOR        12488    1    12      2      1700      55      44 1099      691        2      MINSTEED RD    COLLECTOR          4297    1    12      2      1700      55      44 1100      692        693      SKINNER RD      COLLECTOR          526    1    12      2      1575      35      37 1101      693        687      SKINNER RD      COLLECTOR          4228    1    12      2      1700      55      38 1102      694        695      MARTIN RD      COLLECTOR          1726    1    12      2      1700      45      38 FAIRVILLE MAPLE 1103      695        696                      COLLECTOR        11495    1    12      2      1700      55      38 RIDGE RD FAIRVILLE MAPLE 1104      696        132                      COLLECTOR          2250    1    12      2      1700      55      38 RIDGE RD 1105      698        128      JOY RD          COLLECTOR          5104    1    12      2      1700      55      25 1106      699        700      CO RD 241      COLLECTOR          2665    1    12      2      1700      55      26 1107      700        701      CO RD 241      COLLECTOR          4393    1    12      2      1700      55      26 1108      702        708      HUDSON AVE      MINOR ARTERIAL    766    2    12      2      1750      45      10 1109      703        704      COOPER RD      COLLECTOR          1438    1    10      4      1750      45      10 1110      704        705      COOPER RD      COLLECTOR          863    1    10      4      1750      45      10 1111      705        514      COOPER RD      COLLECTOR          1995    1    10      4      1750      45      10 1112      706        704      DRIVEWAY        COLLECTOR          304    1    12      2      1750      40      10 1113      707        705      DRIVEWAY        COLLECTOR          266    1    12      2      1750      40      10 1114      708        709      HUDSON AVE      MINOR ARTERIAL    480    2    12      2      1750      45      10 1115      709        710      HUDSON AVE      MINOR ARTERIAL    1220    2    12      2      1750      45      10 1116      710        711      HUDSON AVE      MINOR ARTERIAL    2801    2    12      2      1750      45      10 1117      711        712      HUDSON AVE      MINOR ARTERIAL    867    2    12      2      1900      45      16 R.E. Ginna Nuclear Power Plant                              K91                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                                  No. Lane Shoulder    Flow    Flow Stream    Stream                                          Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1118      712        713      HUDSON AVE        COLLECTOR          539    1    12      2      1900      45      16 1119      713        879      SR 104 SERVICE RD  MINOR ARTERIAL    1245    2    12      2      1900      55      16 1120      714        708      DRIVEWAY          COLLECTOR          313    1    12      2      1750      45      10 1121      715        709      DRAKE DR          COLLECTOR          449    1    12      2      1750      40      10 1122      716        710      BROOKVIEW DR      COLLECTOR          1069    1    12      2      1750      40      10 1123      717        718      E RIDGE RD        MINOR ARTERIAL    677    2    12      2      1750      45      10 1124      718        719      E RIDGE RD        MINOR ARTERIAL    620    2    12      2      1750      45      10 1125      719        711      E RIDGE RD        COLLECTOR          2100    1    12      2      1750      45      10 1126      719        723      CARTER ST          COLLECTOR          1235    1    12      2      1900      40      16 1127      720        717      DRIVEWAY          COLLECTOR          405    1    12      2      1750      35      10 1128      721        718      DRIVEWAY          COLLECTOR          352    1    12      2      1750      35      10 1129      722        719      STATON LN          COLLECTOR          2253    1    12      2      1750      40      10 1130      723        880      SR 104 SERVICE RD  MINOR ARTERIAL    335    2    12      2      1900      55      16 1131      724        64      SR 104 ONRAMP    FREEWAY RAMP      619    1    12      2      1700      45      16 1132      724        511      SR 104 SERVICE RD  MINOR ARTERIAL    1341    2    12      2      1900      55      16 1133      726        65      SR 104 ONRAMP    FREEWAY RAMP      753    1    12      2      1700      45      17 1134      726        505      SR 104 SERVICE RD  MINOR ARTERIAL    3814    2    12      2      1750      55      11 1135      727        506      SR 104 SERVICE RD  COLLECTOR          291    1    12      2      1750      40      16 1136      728        510      SR 104 SERVICE RD  MINOR ARTERIAL    348    2    12      2      1750      35      16 1137      729        509      DRIVEWAY          COLLECTOR          405    1    12      2      1900      35      16 1138      730        508      REYNOLDS AVE      COLLECTOR          1242    1    12      2      1750      40      16 590 OFFRAMP TO SR 1139      731        382                        FREEWAY RAMP      288    2    12      2      1750      40      17 404 590 OFFRAMP TO SR 1140      732        383                        FREEWAY RAMP      378    1    12      2      1750      40      17 404 1141      733        490      FOREST AVE        COLLECTOR          1250    1    12      2      1750      35      11 1142      734        491      DRIVEWAY          COLLECTOR          257    1    12      2      1750      35      11 R.E. Ginna Nuclear Power Plant                                  K92                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Saturation Free Up      Down                                                  No. Lane Shoulder    Flow    Flow Stream    Stream                                          Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1143      735        492      DRIVEWAY          COLLECTOR          238    2    12      2      1750      35      11 1144      736        493      BROWN ROAD        COLLECTOR          2543    1    12      2      1750      40      11 1145      737        494      ARROW DR          COLLECTOR          233    1    12      2      1750      35      11 1146      738        448      CROYDON RD        COLLECTOR          1944    1    12      2      1900      40      28 1147      739        448      BOBRICH DR        COLLECTOR          625    1    12      2      1900      40      28 1148      740        442      CLOVER ST          COLLECTOR          1108    1    12      2      1750      40      28 1149      741        742      HIGHLAND AVE      COLLECTOR          3030    1    12      2      1900      40      31 1150      741        842      CLOVER ST          COLLECTOR          4109    1    12      2      1750      40      31 1151      742        741      HIGHLAND AVE      COLLECTOR          3030    1    12      2      1750      40      31 1152      742        743      HIGHLAND AVE      COLLECTOR          386    1    12      2      1700      40      31 SR 590 ONRAMP 1153      743        5      FROM HIGHLAND      FREEWAY RAMP      729    1    12      2      1700      45      31 AVE 1154      743        838      HIGHLAND AVE      COLLECTOR          1690    1    12      0      1900      45      31 I490 ONRAMP 1155      744        184                        FREEWAY RAMP      675    1    12      2      1700      45      39 FROM SR 31 SR 104 OFFRAMP TO 1156      745        315                        FREEWAY RAMP      578    1    12      2      1750      45      12 BAY RD 1157      746        261      ORCHARD RD        COLLECTOR          2578    1    12      2      1750      50      14 1158      747        17      SR 104            FREEWAY            3145    3    12    12      2250      70      12 SR 104 OFFRAMP TO 1159      747        314                        FREEWAY RAMP      1026    1    12      2      1750      45      12 BAY RD 1160      747        920      SR 104            FREEWAY            3099    3    12    12      2250      70      12 1161      748        246      SAN JOSE DR        MINOR ARTERIAL    1425    2    12      2      1750      55      14 1162      748        750      SAN JOSE DR        COLLECTOR          3713    1    12      2      1700      55      15 1163      749        23      SR 104            MINOR ARTERIAL    1979    2    12    10      1900      65      15 1164      749        24      SR 104            MINOR ARTERIAL    2271    2    12    10      1750      65      15 R.E. Ginna Nuclear Power Plant                                  K93                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Saturation Free Up      Down                                                  No. Lane Shoulder    Flow    Flow Stream    Stream                                          Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number SR 104 OFFRAMP TO 1165      749        231                        FREEWAY RAMP      1265    1    12      2      1750      50      15 SALT RD 1166      750        231      SALT RD            MINOR ARTERIAL    509    2    12      2      1750      30      15 1167      750        748      SAN JOSE DR        COLLECTOR          3713    1    12      2      1700      55      15 1168      751        297      HARD RD            COLLECTOR          362    1    12      2      1750      40      13 1169      751        298      HARD RD            COLLECTOR          1028    1    12      2      1750      45      13 1170      752        751      SR 104 SERVICE RD  MINOR ARTERIAL    313    2    12      2      1750      50      13 1171      753        19      SR 104 ONRAMP    FREEWAY RAMP      600    1    12      2      1700      55      13 1172      753        417      SR 104 SERVICE RD  MINOR ARTERIAL    1020    2    12      2      1900      50      13 1173      754        291      SR 104 SERVICE RD  MINOR ARTERIAL    647    2    12      2      1750      55      14 1174      755        20      SR 104 ONRAMP    FREEWAY RAMP      1036    1    12      2      1700      55      14 1175      755        297      SR 104 SERVICE RD  MINOR ARTERIAL    3456    2    12      2      1750      55      13 1176      756        263      SR 104 SERVICE RD  MINOR ARTERIAL    687    1    12      2      1750      50      14 1177      757        21      SR 104 ONRAMP    FREEWAY RAMP      983    1    12      2      1700      55      14 1178      757        290      SR 104 SERVICE RD  MINOR ARTERIAL    3307    2    12      2      1750      55      14 1179      758        244      MITCHELDEAN DR    COLLECTOR          1420    1    12      2      1750      40      14 1180      758        748      EUSTON RD          COLLECTOR          2196    1    12      2      1700      40      15 1181      758        760      MITCHELDEAN DR    COLLECTOR          3656    1    12      2      1700      40      15 1182      759        262      SR 104 OFFRAMP    FREEWAY RAMP      537    2    12      2      1750      50      14 1183      760        750      SALT RD            COLLECTOR          1645    1    12      2      1700      45      15 1184      760        758      MITCHELDEAN DR    COLLECTOR          3656    1    12      2      1750      40      15 1185      761        361      DRIVEWAY          COLLECTOR          522    1    12      2      1750      35      13 1186      762        359      DRIVEWAY          COLLECTOR          329    1    12      2      1750      35      14 WEBSTER COMMONS 1187      763        359                        COLLECTOR          1014    1    12      2      1750      35      14 BLVD 1188      764        360      DRIVEWAY          COLLECTOR          226    1    12      2      1750      35      13 1189      765        358      BARRETT DR        COLLECTOR          1048    1    12      2      1750      40      14 R.E. Ginna Nuclear Power Plant                                  K94                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1190      766        294      SR 404          MINOR ARTERIAL    917    1    12      2      1750      45      14 1191      766        767      JACKSON RD      COLLECTOR          2635    1    12      2      1700      50      14 1192      767        372      JACKSON RD      COLLECTOR          2847    1    12      2      1700      50      14 1193      768        766      RACHEL DR        COLLECTOR          1104    1    12      2      1750      45      14 1194      769        770      SANFORD ST      COLLECTOR          1485    1    12      2      1750      35      14 1195      770        264      SR 250          MINOR ARTERIAL    1153    1    12      2      1750      40      14 1196      770        265      SR 250          MINOR ARTERIAL    1222    1    12      2      1700      40      14 1197      771        887      DEAN PKWY        COLLECTOR          1723    1    12      2      1700      55        5 1198      772        99      KENYON RD        COLLECTOR          3024    1    12      2      1700      50        6 1199      772        891      KNICKERBOCKER RD COLLECTOR          2916    1    12      2      1700      55        6 1200      773        772      KNICKERBOCKER RD COLLECTOR          4689    1    12      2      1700      50        6 1201      774        31      KNICKERBOCKER RD COLLECTOR          2059    1    12      2      1750      40      23 1202      774        100      RIDGE RD        COLLECTOR          972    1    12      2      1750      45      23 1203      775        33      CORTLAND DR      COLLECTOR          783    1    12      2      1750      35        6 1204      776        37      CO RD 116        COLLECTOR          2824    1    12      2      1700      50        7 1205      776        115      CO RD 103        COLLECTOR          1591    1    12      2      1700      50      24 1206      777        895      CO RD 116        COLLECTOR          2297    1    12      2      1700      55        7 1207      778        40      SR 104          MINOR ARTERIAL    1935    1    12    10      1700      60        7 1208      778        793      SR 104          MINOR ARTERIAL    2524    1    12    10      1700      60        8 1209      779        686      JOY RD          COLLECTOR          3577    1    12      2      1700      55      25 1210      780        699      CO RD 236        COLLECTOR          6793    1    12      2      1700      55      26 1211      781        137      BOSTON RD        COLLECTOR          9972    1    12      2      1700      55        5 1212      781        339      CO RD 102        COLLECTOR          5349    1    12      2      1700      55        5 WALWORTH 1213      782        78                        COLLECTOR          7979    1    12      2      1750      55      35 PENFIELD RD WALWORTH 1214      782        149                      COLLECTOR          6931    1    12      2      1700      55      35 PENFIELD RD R.E. Ginna Nuclear Power Plant                                K95                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1215      782        783      CANANDAIGUA RD  COLLECTOR          4450    1    12      2      1700      60      35 1216      783        784      CANANDAIGUA RD  COLLECTOR          1416    1    12      2      1700      50      35 1217      784        785      GANANDA PKWY    COLLECTOR          4359    1    12      2      1700      50      35 1218      784        907      CANANDAIGUA RD  COLLECTOR          2486    1    12      2      1700      55      35 1219      785        617      GANANDA PKWY    COLLECTOR          2603    1    12      2      1700      50      35 1220      785        784      GANANDA PKWY    COLLECTOR          4359    1    12      2      1700      50      35 1221      786        82      31F            COLLECTOR          4897    1    12      2      1750      55      41 1222      786        600      31F            COLLECTOR          8407    1    12      2      1700      55      41 1223      787        786      CANANDAIGUA RD  COLLECTOR          5677    1    12      2      1750      50      41 1224      788        570      CANANDAIGUA RD  COLLECTOR          3280    1    12      2      1750      55      41 1225      789        638      CO RD 113      COLLECTOR          3046    1    12      0      1700      55        6 1226      790        216      HAMILTON RD    COLLECTOR          1304    1    12      2      1700      45        7 1227      790        640      HAMILTON RD    COLLECTOR          844    1    12      2      1700      45        7 1228      791        790      SALMON CREEK RD COLLECTOR          4882    1    12      2      1750      45        7 1229      792        793      REDMAN RD      COLLECTOR          2600    1    12      2      1700      40        8 1230      793        41      SR 104          MINOR ARTERIAL    4453    1    12    10      1700      60        8 1231      793        778      SR 104          MINOR ARTERIAL    2523    1    12    10      1700      60        8 1232      794        644      PODGER RD      COLLECTOR          2579    1    12      0      1700      55      24 1233      795        794      TRIPP RD        COLLECTOR          9023    1    12      2      1700      50      25 WALWORTH 1234      796        192                      COLLECTOR          919    1    12      2      1750      45      37 MARION RD 1235      797        796      DEAN RD        COLLECTOR          3726    1    12      2      1700      55      37 1236      798        998      DEAN RD        COLLECTOR          1010    1    12      2      1700      50      37 1237      799        798      EDDY RIDGE RD  COLLECTOR        10623    1    12      2      1700      55      24 1238      800        206      FAGNER RD      COLLECTOR        12395    1    12      2      1700      55      43 TITUS AVENUE 1239      802        498                      COLLECTOR          645    1    12      2      1575      35      11 EXTENSION R.E. Ginna Nuclear Power Plant                              K96                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                                  No. Lane Shoulder    Flow    Flow Stream    Stream                                          Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1240      803        804      SENECA RD          COLLECTOR          1016    1    12      2      1575      35      11 SENECA RD TRAFFIC 1241      804        56                          COLLECTOR          96    1    12      4        900      20      11 CIRCLE SEA BREEZE DR 1242      805        57                          COLLECTOR          112    1    12      4        900      20      11 TRAFFIC CIRCLE 1243      805        477      SENECA RD          COLLECTOR          2740    1    12      2      1700      40      11 1244      806        807      POINT PLEASANT RD  COLLECTOR          747    1    12      2      1575      35      11 POINT PLEASANT RD 1245      807        54                          COLLECTOR          157    1    12      2        900      20      11 TRAFFIC CIRCLE SEA BREEZE DR 1246      808        55                          COLLECTOR          129    1    12      4        900      20      11 TRAFFIC CIRCLE 1247      808        476      POINT PLEASANT RD  COLLECTOR          1098    1    12      2      1700      40      11 1248      809        810      DURAND BLVD        COLLECTOR          384    1    12      2      1575      35        2 DURAND BLVD 1249      810        52                          COLLECTOR          101    1    12      2        900      20        2 TRAFFIC CIRCLE 1250      811        381      WINTON RD N        COLLECTOR          2049    1    12      2      1750      40      17 1251      812        459      BAY ST            COLLECTOR          2194    1    12      2      1900      40      17 1252      813        843      SR 441            MINOR ARTERIAL    1232    2    12      2      1900      55      32 1253      814        163      LINDEN AVE        COLLECTOR          185    1    12      2      1750      55      32 1254      815        164      LINDEN AVE        COLLECTOR          685    1    12      2      1750      55      32 1255      816        164      LINDEN OAKS        COLLECTOR          237    1    12      2      1750      55      32 1256      817        165      SR 441            MAJOR ARTERIAL    744    3    12      2      1750      40      32 1257      818        817      ASTOR DR          COLLECTOR          298    1    12      2      1750      35      32 1258      819        817      GLEN RD            COLLECTOR          714    1    12      2      1750      35      32 SR 441 OFFRAMP TO 1259      820        429                        FREEWAY RAMP      321    1    12      2      1750      45      32 SR 153 1260      821        742      E HIGHLAND DR      COLLECTOR          1577    1    12      2      1900      45      28 R.E. Ginna Nuclear Power Plant                                  K97                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1261      821        830      E HIGHLAND DR  COLLECTOR          1208    1    12      2      1750      45      28 1262      822        171      I490 ONRAMP  FREEWAY RAMP      1138    1    12      2      1700      55      28 1263      822        172      I490 ONRAMP  FREEWAY RAMP      526    1    12      2      1700      55      28 1264      823        6      SR 590 ONRAMP  FREEWAY RAMP      1106    1    12      2      1700      55      28 1265      823        7      SR 590 ONRAMP  FREEWAY RAMP      1135    2    12      2      1900      55      28 1266      824        9      SR 590          FREEWAY            1466    3    12    12      2250      70      28 SR 590 ONRAMP 1267      824        446                      FREEWAY RAMP      773    1    12      2      1750      40      28 FROM BLOSSOM RD 1268      824        828      SR 590          FREEWAY            1407    2    12    12      2250      70      28 1269      824        857      SR 590          FREEWAY            404    2    12    12      2250      70      28 1270      825        824      SR 590          FREEWAY            1345    4    12    12      2250      70      28 1271      826        7      SR 590 ONRAMP  FREEWAY RAMP      1281    1    12      2      1700      55      28 1272      826        825      SR 590 ONRAMP  FREEWAY RAMP      583    1    12      2      1700      50      28 1273      828        173      I490 ONRAMP  FREEWAY RAMP      917    1    12      2      1700      55      28 1274      828        829      I490 ONRAMP  FREEWAY RAMP      940    1    12      2      1700      55      28 1275      829        174      I490 ONRAMP  FREEWAY RAMP      735    2    12      2      1900      55      28 1276      830        821      E HIGHLAND DR  COLLECTOR          1203    1    12      2      1700      45      28 1277      830        829      I490 ONRAMP  FREEWAY RAMP      740    1    12      2      1700      45      28 1278      830        831      EAST AVE        MINOR ARTERIAL    998    2    12      2      1900      45      28 1279      831        830      EAST AVE        MINOR ARTERIAL    998    2    12      2      1750      45      28 1280      831        832      EAST AVE        MINOR ARTERIAL    717    2    12      2      1900      45      28 1281      832        453      EAST AVE        MINOR ARTERIAL    836    2    12      2      1900      45      28 1282      832        831      EAST AVE        MINOR ARTERIAL    717    2    12      2      1900      45      28 1283      833        855      EAST AVE        MINOR ARTERIAL    226    2    12      2      1900      40      28 1284      834        452      UNIVERSITY AVE  MINOR ARTERIAL    911    2    12      2      1900      45      28 1285      834        833      PROBERT ST      COLLECTOR          373    1    12      2      1900      40      28 1286      836        854      S WINTON RD    MINOR ARTERIAL    212    2    12      2      1900      45      28 R.E. Ginna Nuclear Power Plant                              K98                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length  of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1287      837        838    S WINTON RD    COLLECTOR          2471    1    12      2      1900      45      28 1288      838        839    S WINTON RD    COLLECTOR          913    1    12      2      1700      45      31 1289      838        841    HIGHLAND AVE    COLLECTOR          1041    1    12      0      1700      45      31 1290      840        837    HILLSIDE AVE    COLLECTOR          994    1    12      2      1900      45      28 1291      842        168    CLOVER ST      COLLECTOR          1106    1    12      2      1700      40      31 1292      843        164    SR 441          MAJOR ARTERIAL    580    3    12      2      1750      55      32 1293      844        554    31F            MINOR ARTERIAL    675    2    12      2      1900      45      32 1294      844        845    31F            MINOR ARTERIAL    1960    2    12      2      1750      45      32 1295      845        844    31F            MINOR ARTERIAL    1961    2    12      2      1750      45      32 1296      845        846    SR 96          MINOR ARTERIAL    1376    2    12      2      1750      45      32 1297      846        845    SR 96          MINOR ARTERIAL    1376    2    12      2      1750      45      32 1298      846        847    SR 96          MINOR ARTERIAL    2457    2    12      2      1750      45      32 1299      847        846    SR 96          MINOR ARTERIAL    2457    2    12      2      1750      45      32 1300      847        848    SR 96          MINOR ARTERIAL    868    2    12      2      1750      45      32 1301      848        167    SR 96          MINOR ARTERIAL    487    2    12      2      1750      45      32 1302      848        847    SR 96          MINOR ARTERIAL    868    2    12      2      1750      45      32 1303      849        844    FAIRPORT RD    COLLECTOR          714    1    12      2      1750      40      32 1304      850        845    EAST AVE        COLLECTOR          2077    1    12      2      1750      40      32 1305      851        846    KILBORN AVE    COLLECTOR          398    1    12      2      1750      45      32 1306      852        847    KNOLLYWOOD DR  COLLECTOR          704    1    12      2      1750      40      32 1307      853        848    ALLINS CREEK RD COLLECTOR          1234    1    12      2      1750      40      32 1308      854        837    S WINTON RD    COLLECTOR          209    1    12      2      1900      45      28 1309      855        835    EAST AVE        COLLECTOR          531    1    12      2      1700      40      28 1310      856        831    ROCKWOOD ST    MINOR ARTERIAL    387    2    12      2      1900      35      28 1311      857        1023    SR 590          FREEWAY            800    3    12      2      2250      70      28 1312      858        446    BLOSSOM RD      MINOR ARTERIAL    177    2    12      2      1750      40      28 R.E. Ginna Nuclear Power Plant                              K99                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                                  No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length    of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1313      859        451    GALE TERRACE      COLLECTOR          625    1    12      2      1900      40      28 1314      860        450    JUNIPER ST        COLLECTOR          768    1    12      2      1900      40      28 1315      861        449    N WHINTON RD      MINOR ARTERIAL    347    2    12      2      1900      40      28 1316      862        448    BLOSSOM RD        COLLECTOR          871    1    12      2      1900      40      28 1317      863          9      SR 590            FREEWAY          1287    3    12    12      2250      70      28 1318      863        10      SR 590            FREEWAY          1262    3    12    12      2250      70      28 SR 590 OFFRAMP TO 1319      863        324                        FREEWAY RAMP      1026    1    12      2      1750      50      28 BANCROFT BLVD 1320      864        457    E MAIN ST          COLLECTOR        1362    1    12      2      1900      40      28 1321      864        461    E MAIN ST          COLLECTOR        1324    1    12      2      1900      40      28 1322      865        460    E MAIN ST          COLLECTOR        1161    1    12      2      1900      40      28 1323      866        328    ATLANTIC AVE      COLLECTOR        1195    1    12      2      1900      40      28 1324      866        865    OHIO ST            COLLECTOR        1267    1    12      2      1900      40      28 1325      867        1010    CULVER RD          COLLECTOR        2016    1    12      2      1900      40      17 1326      868        458    MERCHANTS RD      COLLECTOR        1501    1    12      2      1900      40      28 1327      868        867    MERCHANTS RD      COLLECTOR        1300    1    12      2      1900      40      17 1328      869        386    DEERFIELD DR      COLLECTOR        1277    1    12      2      1900      30      17 1329      870        384    HELENDALE RD      COLLECTOR        3199    1    12      2      1750      40      17 1330      870        463    HELENDALE RD      COLLECTOR        1057    1    12      2      1700      40      17 1331      871        65      SR 104            FREEWAY          1936    3    12    12      2250      70      17 1332      871        67      SR 104            FREEWAY          2016    4    12    12      2250      70      17 1333      872        469    CULVER RD          COLLECTOR        1003    1    12      2      1900      45      17 1334      872        482    CULVER RD          MINOR ARTERIAL    1740    2    12      2      1900      45      17 1335      873        13      SR 590            FREEWAY          2119    3    12    12      2250      70      17 1336      873        14      SR 590            FREEWAY            981    4    12    12      2250      70      17 1337      874        70      SR 104            FREEWAY            809    4    12    12      2250      70      11 1338      875        479    WORTHINGTON RD    COLLECTOR        1337    1    12      2      1900      40      11 R.E. Ginna Nuclear Power Plant                                K100                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length    of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1339      876        480      CULVER RD        MINOR ARTERIAL    352    2    12      2      1900      40      11 1340      877        504      DRIVEWAY          COLLECTOR          413    1    12      2      1750      35      10 1341      878        712      DRIVEWAY          COLLECTOR          528    1    12      2      1900      35      16 1342      879        62      SR 104 ONRAMP    FREEWAY RAMP      813    1    12      2      1700      50      16 1343      880        63      SR 104 ONRAMP    FREEWAY RAMP      674    1    12      2      1700      50      16 1344      880        713      SR 104 SERVICE RD MINOR ARTERIAL    1728    2    12      2      1900      55      16 1345      881        530      ST PAUL BLVD      MINOR ARTERIAL    826    2    12      2      1750      45        1 1346      881        534      ST PAUL BLVD      COLLECTOR        2612    1    12      2      1750      45        1 1347      882        527      DRIVEWAY          COLLECTOR          330    1    12      2      1750      40        1 1348      883        261      ORCHARD RD        MINOR ARTERIAL    1304    1    12      2      1750      50      14 1349      884        883      PANAMA RD        COLLECTOR        2034    1    12      2      1750      40      14 1350      885        24      BASKET RD        COLLECTOR          612    1    12      2      1750      30      15 1351      886        25      CO RD 100        COLLECTOR          300    1    12      2      1750      30      15 1352      887        26      DEAN PKWY        COLLECTOR          793    1    12      2      1750      30      22 1353      888        28      CO RD 102        COLLECTOR          531    1    12      2      1750      30        5 1354      889        29      SLOCUM RD        COLLECTOR          442    1    12      2      1750      30        5 1355      890        30      ONTARIO CENTER RD COLLECTOR          673    1    12      2      1750      35        5 1356      891        31      KNICKERBOCKER RD  COLLECTOR        1528    1    12      2      1750      40        6 1357      892        32      SR 110            MINOR ARTERIAL    2041    1    12      2      1750      40        6 1358      893        34      FISHER RD        COLLECTOR          593    1    12      2      1575      35        6 1359      894        36      SALMON CREEK RD  COLLECTOR          502    1    12      2      1350      30        6 1360      895        37      CO RD 116        COLLECTOR          595    1    12      2      1350      30        7 1361      896        38      CO RD 120        COLLECTOR        1041    1    12      2      1750      35        7 1362      897        39      POUND RD          COLLECTOR          532    1    12      2      1750      30        7 1363      898        40      E TOWNLINE RD    COLLECTOR          821    1    12      2      1350      30        7 1364      899        41      N CENTENARY RD    COLLECTOR          760    1    12      2      1350      30        8 R.E. Ginna Nuclear Power Plant                                K101                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length    of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1365      900        677      NORTH RD        COLLECTOR        10457    1    12      2      1700      55        9 1366      901        122      S CENTENARY RD  COLLECTOR        2217    1    12      2      1700      50      25 SR 104 ONRAMP 1367      902        22                        FREEWAY RAMP      651    1    12      2      1700      55      14 FROM PHILLIPS RD 1368      903        75      SR 350          MINOR ARTERIAL    4024    1    12      2      1700      55      22 1369      903        101      PADDY LN        COLLECTOR        5761    1    12      2      1700      50      23 1370      904        905      BUSHWOOD RD      COLLECTOR        1775    1    12      2      1700      45      22 1371      905        75      HENNESSEY RD    COLLECTOR        3191    1    12      2      1700      45      22 1372      906        599      WIEDRICK RD      COLLECTOR        2375    1    12      2      1700      45      35 1373      907        786      CANANDAIGUA RD  COLLECTOR        8020    1    12      2      1750      55      41 WALWORTH 1374      908        108                      COLLECTOR        6154    1    12      2      1700      55      42 ONTARIO RD 1375      909        272      ST CAMILLUS WAY  COLLECTOR        1177    1    12      2      1750      40      34 1376      910        157      SR 250          MINOR ARTERIAL    1666    2    12      2      1750      55      34 1377      911        914      SR 441          MINOR ARTERIAL    1056    2    12      2      1750      50      34 HARRIS WHALEN 1378      912        911                      COLLECTOR        1517    1    12      2      1750      40      34 PARK RD 1379      913        911      DRIVEWAY        COLLECTOR          357    2    12      2      1750      35      34 1380      914        158      SR 441          MINOR ARTERIAL    3473    2    12      2      1750      50      33 1381      915        914      WILLOW POND WAY  COLLECTOR        1577    1    12      2      1750      45      34 ROSSCOMMON 1382      916        604                      COLLECTOR        2056    1    12      2      1750      40      40 CRESCENT 1383      917        275      DRIVEWAY        COLLECTOR          463    1    12      2      1750      35      40 1384      918        159      SR 441          MINOR ARTERIAL    1940    2    12      2      1750      50      33 1385      919        918      HILLCREST DR    COLLECTOR          451    1    12      2      1750      35      33 1386      920        18      SR 104          FREEWAY          5952    2    12    12      2250      70      13 1387      920        747      SR 104          FREEWAY          3094    2    12    12      2250      70      12 R.E. Ginna Nuclear Power Plant                              K102                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length    of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1388      921        417      5 MILE LINE RD  MINOR ARTERIAL    393    2    12      2      1750      40      13 1389      922        297      HARD RD        MINOR ARTERIAL    275    2    12      2      1750      45      13 1390      923        290      HOLT RD        MINOR ARTERIAL    371    2    12      2      1750      40      14 1391      924        292      DRIVEWAY        COLLECTOR          372    2    12      2      1750      35      14 1392      925        293      DRIVEWAY        COLLECTOR          390    2    12      2      1750      35      14 1393      926        262      SR 250          MINOR ARTERIAL    233    2    12      2      1750      35      14 1394      927        263      SR 250          MINOR ARTERIAL    331    2    12      2      1750      35      14 1395      927        264      SR 250          MINOR ARTERIAL    843    1    12      2      1750      40      14 1396      928        39      SR 104          MINOR ARTERIAL    1157    2    12    10      1750      65        7 1397      928        40      SR 104          MINOR ARTERIAL    6100    1    12    10      1700      65        7 1398      929        88      SR 31          MINOR ARTERIAL    2720    1    12      2      1750      40      42 1399      930        929      WILLIAM ST      COLLECTOR          629    1    12      2      1750      35      42 1400      931        87      SR 31          MINOR ARTERIAL    2966    1    12      2      1750      40      42 1401      932        931      HYDE PKWY      COLLECTOR          867    1    12      2      1750      35      42 1402      933        85      SR 31          MINOR ARTERIAL    3454    1    12      2      1700      55      42 1403      934        933      O'NEIL RD      COLLECTOR        1200    1    12      2      1125      25      42 1404      935        571      DRIVEWAY        COLLECTOR          762    2    12      2      1750      35      41 1405      936        579      COURTNEY DR    COLLECTOR          402    1    12      2      1750      35      40 1406      937        279      SR 250          MINOR ARTERIAL    1583    1    12      2      1700      40      40 1407      938        278      SR 250          MINOR ARTERIAL    592    2    12      2      1750      40      40 1408      939        938      SR 250          MINOR ARTERIAL    536    2    12      2      1750      50      40 1409      940        580      DRIVEWAY        COLLECTOR          511    1    12      2      1750      35      40 1410      940        938      DRIVEWAY        COLLECTOR          455    1    12      2      1750      35      40 1411      941        581      VALLEY CREEK DR COLLECTOR          865    1    12      2      1750      35      40 1412      943        277      AYRAULT RD      MINOR ARTERIAL    782    2    12      2      1750      45      40 1413      944        607      AYRAULT RD      COLLECTOR        3436    1    12      2      1700      45      40 R.E. Ginna Nuclear Power Plant                              K103                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length    of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1414      945        285      TURK HILL RD    COLLECTOR        1112    1    12      2      1750      40      40 1415      946        945      DRIVEWAY        COLLECTOR          332    1    12      2      1750      35      40 1416      947        568      SR 250          MINOR ARTERIAL    3198    1    12      2      1700      45      40 1417      948        947      PARK CIRCLE DR  COLLECTOR          977    1    12      2      1750      35      40 1418      949        947      HULBERT LN      COLLECTOR        3064    1    12      2      1750      35      40 1419      950        258      KLEM RD          MAJOR ARTERIAL    397    2    12      2      1750      50        4 1420      951        634      KLEM RD          COLLECTOR        3246    1    12      2      1700      55        4 1421      952        295      HARD RD          COLLECTOR        2522    1    12      2      1750      50        3 1422      952        302      SHOEMAKER RD    COLLECTOR        1788    1    12      2      1700      55        3 1423      953        210      PLANT DRIVEWAY  COLLECTOR          355    1    12    12      1575      35        5 1424      953        954      PLANT DRIVEWAY  COLLECTOR        2088    1    12      2      1700      40        5 1425      954        90      LAKE RD          COLLECTOR        2737    1    12      2      1700      55        5 1426      954        209      LAKE RD          COLLECTOR        1428    1    12      2      1700      55        5 1427      955        286      TURK HILL RD    COLLECTOR        3571    1    12      2      1750      40      40 1428      956        564      JEFFERSON AVE    COLLECTOR          813    1    12      2      1750      40      39 1429      956        606      JEFFERSON AVE    COLLECTOR        7308    1    12      2      1750      40      39 1430      957        563      31F              MINOR ARTERIAL    565    2    12      2      1750      50      39 1431      957        564      31F              MAJOR ARTERIAL    546    1    12      2      1750      50      39 1432      958        562      DRIVEWAY        COLLECTOR          227    1    12      2      1750      35      39 1433      959        561      LAKE CRESCENT DR COLLECTOR          314    1    12      2      1750      30      39 1434      960        555      S LINCOLN RD    COLLECTOR        3255    1    12      2      1750      35      39 1435      961        960      E COMMERCIAL ST  COLLECTOR          794    1    12      2      1750      35      33 1436      962        960      E COMMERCIAL ST  COLLECTOR          786    1    12      2      1750      35      33 1437      963        560      WEST AVE        COLLECTOR        2176    1    12      2      1750      35      39 1438      964        559      DRIVEWAY        COLLECTOR          297    1    12      2      1750      35      39 1439      965        540      DESPATCH DR      COLLECTOR        2034    1    12      2      1750      40      33 R.E. Ginna Nuclear Power Plant                              K104                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                                No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length    of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1440      966        428    PANORAMA TRAIL  MINOR ARTERIAL    716    2    12      2      1750      55      32 PANORAMA CREEK 1441      967        966                      COLLECTOR        1162    1    12      2      1750      35      32 DR 1442      968        966    PANORAMA TRAIL  MINOR ARTERIAL    849    2    12      2      1750      45      32 1443      969        968    DRIVEWAY        COLLECTOR          222    1    12      2      1750      35      32 1444      970        426    PANORAMA TRAIL  MINOR ARTERIAL    518    2    12      2      1750      45      33 1445      971        415    PANORAMA TRAIL  COLLECTOR        1662    1    10      0      1750      35      29 1446      971        427    PANORAMA TRAIL  COLLECTOR        3046    1    10      0      1575      35      29 1447      972        426    PENFIELD RD      MINOR ARTERIAL    422    2    12      2      1750      50      33 1448      973        435    DRIVEWAY        COLLECTOR          220    1    12      2      1750      35      32 1449      974        414    QUALTROUGH RD    COLLECTOR        5207    1    12      2      1750      50      29 1450      975        414    CLARCK RD        COLLECTOR        2254    1    12      2      1750      45      29 1451      976        368    DRIVEWAY        COLLECTOR          345    1    12      2      1750      35      18 1452      977        367    DRIVEWAY        COLLECTOR          290    1    12      2      1750      35      18 1453      978        317    BAY RD          COLLECTOR        1347    1    12      2      1750      40      18 1454      979        978    KIDD CASTLE WAY  COLLECTOR        1356    1    12      2      1750      35      18 1455      980        316    GLEN EDYTH RD    COLLECTOR          174    1    12      2      1750      30      12 1456      981        418    5 MILE LINE RD  MINOR ARTERIAL    441    2    12      2      1750      40      13 1457      981        419    5 MILE LINE RD  COLLECTOR          525    1    12      2      1750      40      13 1458      982        985    BILLS RD        COLLECTOR        1949    1    12      2      1700      50      35 1459      983        984    WATSON HUBERT RD COLLECTOR        5178    1    12      2      1700      50      34 1460      984        1019    SR 441          MINOR ARTERIAL    4205    1    12      2      1750      55      34 1461      985        983    BILLS RD        COLLECTOR          103    1    12      2      1125      25      34 1462      986        148    CO RD 204        COLLECTOR          234    1    12      2      1125      25      35 1463      987        585    SR 31            MINOR ARTERIAL    238    1    12      2      1700      45      39 1464      987        586    SR 31            MINOR ARTERIAL    1964    1    12      2      1750      45      39 1465      988        181    I490            FREEWAY          3439    3    12    12      2250      70      39 R.E. Ginna Nuclear Power Plant                              K105                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length    of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1466      988        182    I490          FREEWAY          4012    2    12    12      2250      70      39 1467      989        536    FOREST HILLS RD COLLECTOR          646    1    12      2      1750      40      29 1468      990        444    BLOSSOM RD      COLLECTOR        4169    1    12      2      1700      50      29 1469      991        992    CO RD 210      COLLECTOR          471    1    12      2      1350      30      42 1470      992        661    CO RD 210      COLLECTOR        6055    1    12      2      1700      50      42 WALWORTH 1471      993        994                    COLLECTOR        4672    1    12      2      1700      60      42 ONTARIO RD WALWORTH 1472      994        109                    COLLECTOR        1131    1    12      2      1575      35      42 ONTARIO RD WALWORTH 1473      995        86                      COLLECTOR        1041    1    12      2      1350      30      42 ONTARIO RD 1474      996        83      SR 350          MINOR ARTERIAL    627    1    12      2      1700      40      41 1475      997        81      SR 350          MINOR ARTERIAL    1744    1    12      2      1700      45      41 1476      997        631    SCOTT RD        COLLECTOR          973    1    12      2      1700      45      41 1477      998        797    DEAN RD        COLLECTOR          105    1    12      2      1350      30      37 1478      999        408    JACKSON RD      COLLECTOR        2776    1    12      2      1700      50      34 1479      1000        424    DRIVEWAY        COLLECTOR          663    1    12      2      1750      35      33 1480      1001        250    PHILLIPS RD    COLLECTOR        2358    1    12      2      1750      50      14 1481      1002        248    PHILLIPS RD    MINOR ARTERIAL    988    2    12      2      1750      40      14 1482      1002        249    PHILLIPS RD    MINOR ARTERIAL    347    2    12      2      1750      50      14 1483      1003        133    SR 88          MINOR ARTERIAL    6245    1    12      2      1700      60      44 1484      1004        685    CO RD 215      COLLECTOR          264    1    12      2      1350      30      38 1485      1005      1004    CO RD 215      COLLECTOR        3688    1    12      2      1700      55      25 1486      1006        684    BEAM HILL RD    COLLECTOR        1442    1    12      2      1700      55      24 1487      1007        141    COUNTY LINE RD  COLLECTOR          206    1    12      2      1350      30      21 1488      1008        460    CULVER RD      COLLECTOR        1624    1    12      2      1900      40      28 1489      1009        461    WISCONSIN ST    COLLECTOR        1212    1    12      2      1900      40      28 R.E. Ginna Nuclear Power Plant                              K106                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                                  No. Lane Shoulder    Flow    Flow Stream    Stream                                        Length    of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name    Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number 1490      1009      1008    GARSON AVE        COLLECTOR        2004    1    12      2      1900      35      28 1491      1010      1008    CULVER RD          COLLECTOR          736    1    12      2      1900      40      28 1492      1011      1010    PARCELLS AVE      COLLECTOR          945    1    12      2      1900      35      28 1493      1012        384    HELENDALE RD      COLLECTOR        1800    1    12      2      1750      40      17 1494      1012        462    CULVER PKWY        COLLECTOR        1871    1    12      2      1700      40      17 1495      1013        702    TITUS AVE          COLLECTOR          334    1    12      2      1750      40      10 1496      1014        530    SAGAMORE CIR      COLLECTOR          285    1    12      2      1750      30        1 1497      1015        496    E RIDGE RD        MINOR ARTERIAL    1445    2    12      2      1750      45      10 1498      1016      1015    DRIVEWAY          COLLECTOR          171    1    12      2      1750      35      10 SR 104 OFFRAMP TO 1499      1017        481                        FREEWAY RAMP      306    2    12      2      1900      40      11 CULVER RD 1500      1018        365    GRAVEL RD          COLLECTOR        2192    1    12      2      1750      50      12 1501      1019        153    SR 441            MINOR ARTERIAL    2026    1    12      2      1750      55      34 1502      1020        237    SR 286            MINOR ARTERIAL    1964    1    12      2      1700      55      34 1503      1020      1021    GLORIA DR          COLLECTOR        2547    1    10      1      1750      55      34 1504      1021        238    SWEET CORNERS RD  COLLECTOR        1999    1    10      2      1750      50      34 1505      1021      1019    GLORIA DR          COLLECTOR        7936    1    10      1      1750      55      34 1506      1022        590    WHALEN RD          COLLECTOR        3709    1    12      2      1700      50      30 1507      1023        7      SR 590            FREEWAY          1341    2    12      2      2250      70      28 1508      1024        842    ELMWOOD AVE        COLLECTOR        4513    1    12      2      1750      40      31 1509      1025        79      SR 350            MINOR ARTERIAL    4984    1    12      4      1700      60      36 1510      1026        660    CO RD 210          COLLECTOR        6861    1    12      2      1700      55      36 1511      8004        4      SR 590            FREEWAY            388    3    12    12      2250      70      31 1512      8049        49      SR 104            MINOR ARTERIAL    624    1    12    10      1700      60      26 1513      8061        61      SR 104            FREEWAY            494    3    12    12      2250      70      16 1514      8185        185    I490              FREEWAY            626    2    12    12      2250      70      39 R.E. Ginna Nuclear Power Plant                                K107                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length    of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number Exit 135        8135    SR 88          MINOR ARTERIAL    340    1    12      2      1700      55      44 Link Exit 49        8049    SR 104          MINOR ARTERIAL    624    1    12    10      1700      60      26 Link Exit 89        8089    SR 31          MINOR ARTERIAL    580    1    12      2      1700      45      43 Link Exit 544        8544    SR 153          MINOR ARTERIAL    523    1    12      2      1700      50      39 Link Exit 801        8801    SR 21          MINOR ARTERIAL    591    1    12      2      1700      55      42 Link Exit 279        8279    SR 250          MINOR ARTERIAL    372    1    12      2      1700      40      40 Link Exit 587        8587    SR 31          MINOR ARTERIAL    413    1    12      2      1700      45      39 Link Exit 4        8004    SR 590          FREEWAY            388    3    12    12      2250      70      31 Link Exit 61        8061    SR 104          FREEWAY            494    3    12    12      2250      70      16 Link Exit 185        8185    I490          FREEWAY            626    2    12    12      2250      70      39 Link Exit 168        8168    CLOVER ST      COLLECTOR          318    1    12      2      1700      40      31 Link Exit 169        8189    I490          FREEWAY            460    4    12    12      2250      70      28 Link Exit 529        8529    PATTONWOOD DR  MINOR ARTERIAL    192    2    12      2      1900      40        1 Link Exit                          FAIRVILLE MAPLE 697        8697                    COLLECTOR          665    1    12      2      1700      50      44 Link                          RIDGE RD R.E. Ginna Nuclear Power Plant                              K108                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Saturation Free Up      Down                                              No. Lane Shoulder    Flow    Flow Stream    Stream                                      Length    of  Width Width      Rate    Speed    Grid Link #    Node      Node        Roadway Name  Roadway Type      (ft.) Lanes (ft.)  (ft.)  (pcphpl) (mph) Number Exit 701        8701    CO RD 241      COLLECTOR          837    1    12      2      1700      55      26 Link Exit 835        8835    EAST AVE        COLLECTOR          221    1    12      2      1700      40      28 Link Exit 839        8839    S WINTON RD    COLLECTOR          309    1    12      2      1700      45      31 Link Exit 841        8841    HIGHLAND AVE    COLLECTOR          282    1    12      0      1700      45      31 Link Exit 942        8942    KREAG RD        COLLECTOR          356    1    12      2      1700      40      39 Link Exit 329        8329    ATLANTIC AVE    COLLECTOR          467    1    12      2      1700      40      27 Link Exit 393        8393    CLIFFORD AVE    COLLECTOR          232    1    12      2      1700      40      16 Link Exit 627        8627    VICTOR RD      COLLECTOR          964    1    12      2      1700      50      40 Link Exit 629        8629    CANANDAIGUA RD  COLLECTOR          682    1    12      2      1700      50      41 Link Exit 630        8630    CO RD 312      COLLECTOR          615    1    12      2      1700      50      42 Link Exit 671        8671    LAKE RD        COLLECTOR          478    1    12      2      1700      55        9 Link Exit 679        8679    RIDGE RD        COLLECTOR          530    1    12      2      1700      55      26 Link R.E. Ginna Nuclear Power Plant                              K109                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
Table K2. Nodes in the LinkNode Analysis Network which are Controlled X            Y Coordinate    Coordinate      Control      Grid Map Node          (ft)          (ft)          Type          Number 1        550109        1184807        Actuated          1 2        683328        1118583          Stop            44 24        605906        1175248        Actuated          15 25        609098        1175603        Actuated          15 26        611869        1176088        Actuated          22 27        616723        1176403        Actuated          22 28        619125        1176504        Actuated          22 29        622844        1176775        Actuated          5 30        627542        1176835    TCP  Actuated        5 31        632855        1176730        Actuated          23 32        633977        1176726    TCP  Actuated      23 33        638185        1177665        Actuated          6 34        641948        1177875          Stop            6 36        651042        1178463          Stop            6 37        655453        1178627          Stop            7 38        659323        1178537    TCP  Actuated        7 39        663372        1179290        Actuated          7 40        670628        1179471          Stop            7 41        679500        1180386          Stop            8 43        687950        1180785          Stop            8 44        692596        1182109    TCP  Actuated        8 45        695917        1180030          Stop            9 46        699534        1177088    TCP  Actuated        9 47        702939        1174691          Stop            26 48        705819        1173430          Stop            26 52        564102        1177434          Yield            2 54        563927        1176297          Yield          11 56        563483        1173507          Yield          11 58        562563        1171900          Yield          11 59        562589        1171757          Yield          11 71        627762        1193289    TCP  Actuated        5 72        627820        1187896          Stop            5 73        627541        1181256    TCP  Actuated        5 74        627518        1176379    TCP  Actuated      22 75        630144        1166127          Stop            22 76        632103        1160831          Stop            23 77        631688        1153751    TCP  Actuated      36 R.E. Ginna Nuclear Power Plant                        K110                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                Rev. 1
 
X          Y Coordinate Coordinate    Control    Grid Map Node        (ft)      (ft)          Type      Number 78      630830    1144581    TCP  Actuated    36 79      630660    1136814        Stop        36 82      628188    1128231      Actuated        41 84      629366    1119277      Actuated        41 86      640057    1116263        Stop        42 87      646466    1116879      Actuated        42 88      649681    1116437      Actuated        42 TCP  No 90      622662    1192954                      5 Control TCP  No 92      622782    1181193                      5 Control 93      622872    1175186        Stop        22 94      622842    1167865        Stop        22 TCP  No 95      637824    1194558                      6 Control 99      635856    1181297        Stop          6 100      633612    1174364      Pretimed        23 101      634601    1170049        Stop        23 105      636251    1144560    TCP  Actuated    36 108      637294    1127330        Stop        42 111      660987    1196305        Stop          7 112      641921    1174724        Stop        23 114      651030    1174899        Stop        23 116      659489    1175287    TCP  Actuated    24 118      663964    1178354        Stop          7 119      670554    1177685        Stop          7 122      679542    1177842        Stop          8 124      688406    1180397    TCP  Actuated    8 126      692705    1179516      Actuated        8 128      691596    1166188        Stop        25 132      687820    1135657        Stop        38 134      683872    1118095        Stop        44 TCP  No 136      609045    1192344                      4 Control 137      609085    1187166        Stop          4 138      609064    1181865        Stop          4 140      609089    1167936        Stop        15 142      616749    1175860        Stop        22 143      616895    1167915        Stop        22 R.E. Ginna Nuclear Power Plant                  K111                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
X          Y Coordinate Coordinate    Control    Grid Map Node        (ft)      (ft)          Type      Number 145      617236    1160741        Stop        22 146      618646    1153607        Stop        35 147      618688    1149558        Stop        35 149      615919    1144584        Stop        35 152      609462    1141831      Actuated        35 153      602088    1141718      Actuated        34 154      598825    1141255        Stop        34 156      593600    1141798      Actuated        34 157      591197    1141846    TCP  Actuated    34 158      585152    1142080      Actuated        33 159      581954    1141697      Actuated        33 163      573627    1139325      Actuated        32 164      570127    1140466      Actuated        32 165      569124    1141500      Actuated        32 166      568639    1141493      Actuated        32 167      567778    1141266      Actuated        32 192      656567    1146828    TCP  Actuated    37 193      656877    1143663        Stop        37 199      658542    1145878      Pretimed        37 206      669757    1127247        Stop        43 209      626813    1193274        Stop          5 216      659715    1195574        Stop          7 TCP  No 224      692182    1189620                      8 Control 227      605830    1182010        Stop          4 230      602425    1181938        Stop          4 231      602485    1174513    TCP  Actuated    15 232      602494    1174112    TCP  Actuated    15 233      602498    1173647    TCP  Actuated    15 234      602328    1168409        Stop        15 236      602255    1160322        Stop        21 237      602156    1152234        Stop        34 238      602144    1149683    TCP  Actuated    34 242      597394    1181862        Stop          4 243      597430    1178895      Actuated        4 244      597394    1176528      Actuated        14 246      597420    1174305    TCP  Actuated    14 248      597418    1173507      Actuated        14 R.E. Ginna Nuclear Power Plant                  K112                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
X          Y Coordinate Coordinate    Control    Grid Map Node        (ft)      (ft)          Type      Number 249      597414    1172173    TCP  Actuated    14 250      597441    1167808      Actuated        14 TCP  No 251      593563    1190316                      4 Control 256      594907    1181882    TCP  Actuated    4 258      594946    1178900      Actuated        4 261      594522    1174262      Actuated        14 262      594444    1173054    TCP  Actuated    14 263      594428    1172709    TCP  Actuated    14 264      594417    1171534      Actuated        14 266      594367    1166792      Actuated        14 267      594187    1160482      Actuated        20 269      593845    1152550    TCP  Actuated    34 270      593290    1149909        Stop        34 271      591326    1145642      Actuated        34 272      591146    1140607      Actuated        34 273      590952    1133715      Actuated        40 274      590922    1132461      Actuated        40 275      590862    1130693      Actuated        40 276      590832    1130103      Actuated        40 277      590821    1123046      Actuated        40 278      590650    1119457      Actuated        40 281      593522    1133647      Actuated        40 282      593499    1131739      Actuated        40 283      593252    1129474      Actuated        40 285      593410    1123055      Actuated        40 286      593392    1119158      Actuated        40 289      590076    1178303      Actuated        4 290      590065    1173023      Actuated        14 291      590065    1172530      Actuated        14 292      590068    1172003      Actuated        14 293      590048    1171508      Actuated        14 294      590048    1170915      Actuated        14 295      586151    1178376      Actuated        3 297      586150    1172516      Actuated        13 298      586192    1171127      Actuated        13 299      586231    1170319      Actuated        13 302      584409    1180697        Stop          3 R.E. Ginna Nuclear Power Plant                  K113                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
X          Y Coordinate Coordinate    Control    Grid Map Node        (ft)      (ft)          Type      Number 303      584395    1178368        Stop          3 306      580526    1178282        Stop          3 312      573473    1178417        Stop          3 314      571683    1172587    TCP  Actuated    12 315      571733    1171866    TCP  Actuated    12 316      572295    1169393      Actuated        12 317      574710    1163572    TCP  Actuated    18 318      575112    1160886      Actuated        18 321      574072    1150461      Actuated        29 324      565428    1151913      Actuated        28 326      564057    1151858      Actuated        28 327      562524    1151772      Actuated        28 328      557495    1151640      Actuated        28 330      564676    1151875      Actuated        28 331      564663    1152130        Yield        28 TCP  No 332      571899    1181931                      3 Control 335      599247    1160377        Stop        21 336      599013    1152348        Stop        34 337      598915    1149773    TCP  Actuated    34 340      619119    1175668        Stop        22 348      581241    1180278        Stop          3 352      606566    1174901        Stop        15 354      608552    1175419        Stop        15 355      609092    1175451        Stop        15 356      605928    1174766        Stop        15 358      592364    1171258      Actuated        14 359      588729    1170782      Actuated        14 360      585280    1170084      Actuated        13 361      584094    1169658      Actuated        13 362      582588    1169064      Actuated        13 363      579877    1168765      Actuated        13 364      577898    1168740      Actuated        13 365      576837    1168991      Actuated        12 367      575113    1164635      Actuated        18 368      574959    1164190      Actuated        18 372      590894    1165514        Stop        20 373      585750    1162139        Stop        19 R.E. Ginna Nuclear Power Plant                  K114                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
X          Y Coordinate Coordinate    Control    Grid Map Node        (ft)      (ft)          Type      Number 374      583725    1160793        Stop        19 375      582462    1160761    TCP  Actuated    19 377      573609    1160921      Actuated        18 381      565508    1159024      Actuated        17 382      564675    1159016    TCP  Actuated    17 383      564099    1158984      Actuated        17 384      563699    1158974      Actuated        17 385      562410    1158935      Actuated        17 386      560413    1158861      Actuated        17 387      559588    1158839      Actuated        17 388      557584    1158765      Actuated        17 389      555378    1158750      Actuated        16 390      553826    1158678      Actuated        16 391      553088    1158697      Actuated        16 392      551372    1158617      Actuated        16 396      585739    1160716        Stop        19 398      590789    1160667        Stop        20 404      610251    1160716        Stop        22 406      610472    1153347        Stop        35 411      582179    1150255      Actuated        30 412      579607    1150284      Actuated        30 414      577076    1150371      Actuated        29 415      575085    1150396      Actuated        29 416      582325    1173968      Actuated        13 417      582470    1172479      Actuated        13 418      582494    1172178      Actuated        13 419      582617    1171218      Actuated        13 423      582077    1146207      Actuated        30 424      582007    1143985      Actuated        33 425      581916    1138501      Actuated        33 426      577612    1142902      Actuated        33 428      576900    1141056      Actuated        32 429      577053    1140776      Actuated        32 431      579069    1137721      Actuated        33 432      581320    1138308      Actuated        33 434      579726    1155484        Stop        30 435      576760    1143476      Actuated        32 438      567599    1144727      Actuated        32 R.E. Ginna Nuclear Power Plant                  K115                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
X          Y Coordinate Coordinate  Control Grid Map Node        (ft)      (ft)      Type  Number 440      565722    1144668    Actuated    31 441      564987    1144628    Actuated    31 442      564756    1144894    Actuated    31 444      568000    1148933      Stop      29 445      566182    1148894    Actuated    28 446      565115    1148908    Actuated    28 447      564730    1148927    Actuated    28 448      563263    1148958    Actuated    28 449      561398    1149015    Actuated    28 450      561889    1150194    Actuated    28 451      561316    1148780    Actuated    28 452      560974    1147918    Actuated    28 453      560827    1147557    Actuated    28 456      562924    1152743    Actuated    28 457      562785    1152351    Actuated    28 458      560837    1154361    Actuated    28 459      559712    1157073    Actuated    17 460      557974    1152845    Actuated    28 461      560230    1152897    Actuated    28 462      561909    1157092      Stop      17 463      563550    1163210      Stop      17 464      563787    1163138      Yield    17 467      561585    1163196    Actuated    17 469      559471    1163093    Actuated    17 470      556871    1163051    Actuated    17 471      555385    1163017    Actuated    16 472      553297    1162965    Actuated    16 475      563430    1177483    Actuated    2 476      562707    1176142      Stop      11 477      560584    1173305      Stop      11 478      559792    1171702    Actuated    11 479      559282    1170088    Actuated    11 480      559302    1168680    Actuated    11 481      559393    1166237    Actuated    11 482      559374    1165837    Actuated    17 483      559576    1160102    Actuated    17 484      555440    1160766    Actuated    16 485      558743    1160992    Actuated    17 R.E. Ginna Nuclear Power Plant                  K116                  KLD Engineering, P.C.
Evacuation Time Estimate                                                              Rev. 1
 
X          Y Coordinate Coordinate  Control Grid Map Node        (ft)      (ft)      Type  Number 486      557523    1160931      Stop      17 490      561079    1169053    Actuated    11 491      560519    1169046    Actuated    11 492      559950    1168963    Actuated    11 493      557836    1168174    Actuated    11 494      557124    1167872    Actuated    11 495      555274    1167198    Actuated    10 496      553190    1166667    Actuated    10 498      562670    1171883      Yield    11 500      554422    1171626    Actuated    10 501      553018    1171575    Actuated    10 504      555288    1166774    Actuated    10 505      555293    1166329    Actuated    10 506      555274    1165999    Actuated    16 508      555378    1163615    Actuated    16 509      553274    1165170    Actuated    16 510      553230    1165647    Actuated    16 511      553242    1165969    Actuated    16 514      549633    1171500    Actuated    10 520      557979    1181644      Stop      2 525      550098    1185305    Actuated    1 527      547786    1185247    Actuated    1 528      547135    1185119    Actuated    1 530      549447    1178678    Actuated    1 532      549403    1177089      Stop      1 534      549552    1182108    Actuated    1 536      567842    1146475    Actuated    29 540      578582    1136955    Actuated    33 541      577996    1136046    Actuated    33 543      575477    1133864    Actuated    39 546      575706    1136925    Actuated    32 552      574649    1134167    Actuated    39 553      573752    1134675    Actuated    32 555      580513    1131738    Actuated    39 559      576847    1133227    Actuated    39 560      578326    1132627    Actuated    39 561      579922    1131962    Actuated    39 562      583801    1131545    Actuated    39 R.E. Ginna Nuclear Power Plant                  K117                  KLD Engineering, P.C.
Evacuation Time Estimate                                                              Rev. 1
 
X          Y Coordinate Coordinate  Control Grid Map Node        (ft)      (ft)      Type  Number 563      584509    1131516    Actuated    39 564      585578    1131212    Actuated    39 570      623358    1117346    Actuated    41 571      613714    1117488    Actuated    41 572      612337    1117489    Actuated    41 574      604102    1117616      Stop      40 575      602808    1117590    Actuated    40 576      600016    1117623    Actuated    40 579      591426    1119355    Actuated    40 580      590174    1119560    Actuated    40 581      589257    1119862    Actuated    40 582      585724    1121226    Actuated    39 583      581383    1122612    Actuated    39 586      576895    1123882    Actuated    39 590      585269    1146104      Stop      30 594      585193    1134288    Actuated    39 598      601497    1133680      Stop      40 599      627875    1136199      Stop      35 600      614883    1128276      Stop      41 602      609400    1128907      Stop      41 603      602735    1128414      Stop      40 604      601174    1128344    Actuated    40 606      585395    1123093    Actuated    39 608      598316    1123064    Actuated    40 610      601457    1123064      Stop      40 615      614638    1140689      Stop      35 621      604071    1128378      Stop      40 623      614903    1125518      Stop      41 628      623384    1115867      Stop      41 631      630103    1128258      Stop      41 632      645258    1126868      Stop      42 637      641913    1181520      Stop      6 638      651064    1181675      Stop      6 640      660378    1193531      Stop      7 644      670270    1166181      Stop      24 649      665142    1149639      Stop      37 654      641886    1162548      Stop      23 659      642766    1145036      Stop      36 R.E. Ginna Nuclear Power Plant                  K118                  KLD Engineering, P.C.
Evacuation Time Estimate                                                              Rev. 1
 
X          Y Coordinate Coordinate    Control    Grid Map Node        (ft)      (ft)          Type      Number 674      700828    1176773        Stop          9 675      700890    1175986        Stop        26 677      703221    1175427        Stop        26 686      676711    1155365        Stop        38 687      676822    1148021        Stop        38 695      681341    1146972        Stop        38 699      695843    1166307        Stop        26 702      548936    1171452      Actuated        10 704      549565    1174358      Actuated        10 705      549588    1173495      Actuated        10 708      548944    1170686      Actuated        10 709      548970    1170207      Actuated        10 710      549001    1168987      Actuated        10 711      549062    1166187      Actuated        16 712      549084    1165320      Actuated        16 713      549106    1164781      Actuated        16 717      552429    1166623      Actuated        10 718      551753    1166575      Actuated        10 719      551138    1166500      Actuated        10 723      551111    1165265      Actuated        16 741      564633    1144600      Actuated        31 742      561604    1144516      Actuated        31 748      598838    1174448        Stop        15 TCP  No 749      603749    1174559                      15 Control 750      602506    1175022        Stop        15 751      586150    1172154      Actuated        13 758      598809    1176644      Actuated        15 760      602465    1176667        Stop        15 766      590956    1170995      Actuated        14 770      594383    1170382      Actuated        14 772      632832    1181174        Stop          6 776      655428    1175804        Stop        24 777      655470    1181520        Stop          7 784      623289    1138758        Stop        35 786      623291    1128252      Actuated        41 789      648013    1181788        Stop          6 790      660110    1194332    TCP  Actuated    7 R.E. Ginna Nuclear Power Plant                  K119                        KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
X          Y Coordinate Coordinate  Control Grid Map Node        (ft)      (ft)      Type  Number 793      675047    1180095      Stop      8 794      672849    1166191      Stop      25 796      655648    1146833      Stop      37 798      654310    1150687      Stop      37 804      563557    1173446      Yield    11 805      563321    1173428      Yield    11 807      564022    1176172      Yield    11 810      564159    1177350      Yield      2 817      569764    1141140    Actuated    32 830      562963    1146362    Actuated    28 831      562320    1147126    Actuated    28 832      561639    1147349    Actuated    28 833      559994    1147865    Actuated    28 836      560630    1147118    Actuated    28 837      560462    1146732    Actuated    28 838      559529    1144444    Actuated    31 842      563010    1140853    Actuated    31 844      572330    1135806    Actuated    32 845      570901    1137141    Actuated    32 846      570083    1138247    Actuated    32 847      568471    1140101    Actuated    32 848      568030    1140849    Actuated    32 865      559135    1152861    Actuated    28 867      559637    1156893    Actuated    17 883      595825    1174319    Actuated    14 903      628841    1169935      Stop      22 905      625427    1166061      Stop      22 907      623163    1136275      Stop      35 908      637415    1133485      Stop      42 911      589679    1141917    Actuated    34 914      588624    1141967    Actuated    34 918      583819    1142171    Actuated    33 929      647037    1116917    Actuated    42 931      643508    1116825    Actuated    42 933      631445    1119403      Stop      42 938      590664    1120048    Actuated    40 945      593415    1124166    Actuated    40 947      590780    1127199    Actuated    40 R.E. Ginna Nuclear Power Plant                  K120                  KLD Engineering, P.C.
Evacuation Time Estimate                                                              Rev. 1
 
X                Y Coordinate        Coordinate          Control            Grid Map Node              (ft)            (ft)              Type              Number 954          625385            1193227              Stop                  5 960          580926            1134963          Actuated                33 966          576859            1141759          Actuated                32 968          577326            1142469          Actuated                32 978          574072            1164757          Actuated                18 982          610233            1147502              Stop                35 984          608318            1141784              Stop                34 999          589765            1155300              Stop                34 1008          558588            1154349          Actuated                28 1009          560575            1154084              Stop                28 1010          558850            1155037          Actuated                28 1012          563779            1157176              Stop                17 1015          554591            1167021          Actuated                10 TCP  No 1021          604143            1149677                                  34 Control 1
Coordinates are in the North American Datum of 1983 Central New York Plane Zone R.E. Ginna Nuclear Power Plant                              K121                                      KLD Engineering, P.C.
Evacuation Time Estimate                                                                                            Rev. 1
 
APPENDIX L ERPA Boundaries
 
L. ERPA BOUNDARIES ERPA M1            County: Monroe Defined as the area within the following boundary: The section of the Town of Webster bounded on the north by Lake Ontario, on the east by the Monroe Wayne County Line, to Route 104 on the south; to Salt Road north to Schlegel Road west to Route 250, north to Lake Ontario.
ERPA M2            County: Monroe Defined as the area within the following boundary: The section of the Town of Webster and the Town of Penfield bounded on the north by Route 104, on the east by the MonroeWayne County Line, on the south by Plank Road and on the west by Salt Road.
ERPA M3            County: Monroe Defined as the area within the following boundary: The section of the Town of Webster bounded on the north by Schlegel Road, on the east by Salt Road, on the south by Route 104 and on the west by Route 250.
ERPA M4            County: Monroe Defined as the area within the following boundary: The section of the town of Webster and the Town of Penfield bounded on the north by Route 104, on the east by Salt Road, on the south by Plank Road, and on the west by both Jackson and Holt Roads.
ERPA M5            County: Monroe Defined as the area within the following boundary: The section of the Town of Penfield bounded on the north by Plank Road, on the east by the MonroeWayne County Line, on the south by Sweets Corners Road, and on the west by Route 250, Penfield Center Road and Jackson Road to Plank Road.
ERPA M6            County: Monroe Defined as the area within the following boundary: The section of the Town of Webster bounded on the north by Lake Ontario, on the east by Route 250, on the south by Route 104, and on the west by Hard, Klem, and Whiting Roads.
ERPA M7            County: Monroe Defined as the area within the following boundary: The section of the Town of Webster and the Town of Penfield bounded on the north by Route 104, on the east by Plank Road, and on the west by Hatch Road to Ridge Road to Gravel Road.
R.E. Ginna Nuclear Power Plant                  L1                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
ERPA M8            County: Monroe Defined as the area within the following boundary: The section of the Town of Webster bounded on the north by Lake Ontario, on the east by Whiting Road, on the south by Klem Road, and on the west by Bay Road.
ERPA M9            County: Monroe Defined as the area within the following boundary: The section of the Town of Webster bounded on the north by Klem Road, on the east by Hard Road, on the south by Route 104, and on the west by Maple Drive.
ERPA W1            County: Wayne Defined as the area within the following boundary: The section of the Town of Ontario north of Berg Road and Kenyon Road.
ERPA W2            County: Wayne Defined as the area within the following boundary: The section of the Town of Ontario south of Berg Road and Kenyon Road.
ERPA W3            County: Wayne Defined as the area within the following boundary: The northwest section of the Town of Williamson west of Salmon Creek Road and north of Old Ridge Road.
ERPA W4            County: Wayne Defined as the area within the following boundary: The northeast section of the Town of Williamson east of Salmon Creek Road and north of the Ontario Midland Railroad (along Route 104), and the Town of Sodus west of North Centenary Road and north of the Ontario Midland Railroad (along Route 104).
ERPA W5            County: Wayne Defined as the area within the following boundary: The Town of Williamson south of the Ontario Midland Railroad (along Route 104), and a small part of the Town of Sodus south of the Ontario Midland Railroad and west of Richardson Road.
ERPA W6            County: Wayne Defined as the area within the following boundary: The northwest portion of the Town of Marion north of WalworthMarion Road and west of MarionEast Williamson Road.
ERPA W7            County: Wayne Defined as the area within the following boundary: All the Town of Walworth north of Route 441 and PenfieldWalworth Road including the Hamlet of Walworth.
R.E. Ginna Nuclear Power Plant                  L2                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                      Rev. 1
 
APPENDIX M Evacuation Sensitivity Studies
 
M. EVACUATION SENSITIVITY STUDIES This appendix presents the results of a series of sensitivity analyses. These analyses are designed to identify the sensitivity of the ETE to changes in some base evacuation conditions.
M.1 Effect of Changes in Trip Generation Times A sensitivity study was performed to determine whether changes in the estimated trip generation time have an effect on the ETE for the entire EPZ. Specifically, if the tail of the mobilization distribution were truncated (i.e., if those who responded most slowly to the Advisory to Evacuate, could be persuaded to respond much more rapidly), how would the ETE be affected? The case considered was Scenario 1, Region 3; a summer, midweek, midday, good weather evacuation of the entire EPZ. Table M1 presents the results of this study.
Table M1. Evacuation Time Estimates for Trip Generation Sensitivity Study Trip                            Evacuation Time Estimate for Entire EPZ Generation Period                    90th Percentile                    100th Percentile 1 Hours 45 Minutes                      2:10                                3:10 2 Hours 45 Minutes                      2:15                                3:10 3 Hours 45 Minutes (Base)                  2:15                                3:55 As discussed in Section 7.3, traffic congestion persists within the EPZ for about 3 hours. As such, the ETE for the 100th percentiles are affected by differences in trip generation time greater than 3 hours. The 90th percentile ETE are not sensitive to truncating the tail of the mobilization time distribution.
R.E. Ginna Nuclear Power Plant                      M1                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                                Rev. 1
 
M.2 Effect of Changes in the Number of People in the Shadow Region Who Relocate A sensitivity study was conducted to determine the effect on ETE of changes in the percentage of people who decide to relocate from the Shadow Region. The case considered was Scenario 1, Region 3; a summer, midweek, midday, good weather evacuation for the entire EPZ. The movement of people in the Shadow Region has the potential to impede vehicles evacuating from an Evacuation Region within the EPZ. Refer to Sections 3.2 and 7.1 for additional information on population within the shadow region.
Table M2 presents the evacuation time estimates for each of the cases considered. The results show that the ETE is not impacted by shadow evacuation from 0% to 20%. Tripling the shadow percentage increases the ETE by 5 minutes for the 90th percentile - not a significant change. Note, the telephone survey results presented in Appendix F indicate that 25% of households would elect to evacuate if advised to shelter, only 5% off from the base assumption of 20% noncompliance suggested in NUREG/CR7002.
Table M2. Evacuation Time Estimates for Shadow Sensitivity Study Evacuating                Evacuation Time Estimate for Entire EPZ Percent Shadow              Shadow Evacuation              Vehicles              90th Percentile                100th Percentile 0                      0                        2:15                            3:55 20 (Base)                19,524                    2:15                            3:55 25 (Survey)              24,405                    2:15                            3:55 60                  58,572                    2:20                            3:55 R.E. Ginna Nuclear Power Plant                      M2                                  KLD Engineering, P.C.
Evacuation Time Estimate                                                                              Rev. 1
 
M.3 Effect of Changes in EPZ Resident Population A sensitivity study was conducted to determine the effect on ETE of changes in the resident population within the EPZ. As population in the EPZ changes over time, the time required to evacuate the public may increase, decrease, or remain the same. Since the ETE is related to the demand to capacity ratio present within the EPZ, changes in population will cause the demand side of the equation to change. The sensitivity study was conducted using the following planning assumptions:
: 1. The change in population within the EPZ was treated parametrically. The percent population change was varied between +/-30%. Changes in population were applied to permanent residents only (as per federal guidance), in both the EPZ area and the Shadow Region.
: 2. The transportation infrastructure remained fixed; the presence of new roads or highway capacity improvements were not considered.
: 3. The study was performed for the 2Mile Region (R01), the 5Mile Region (R02) and the entire EPZ (R03).
: 4. The good weather scenario which yielded the highest ETE values was selected as the case to be considered in this sensitivity study (Scenario 1).
Table M3 presents the results of the sensitivity study. Section IV of Appendix E to 10 CFR Part 50, and NUREG/CR7002, Section 5.4, require licensees to provide an updated ETE analysis to the NRC when a population increase within the EPZ causes ETE values (for the 2Mile Region, 5 Mile Region or entire EPZ) to increase by 25 percent or 30 minutes, whichever is less.
Those percent population changes which result in ETE changes greater than 30 minutes or 25%
are highlighted in red below - a 51% increase or 87% decrease in the EPZ population. CENG will have to estimate the EPZ population on an annual basis. If the EPZ population increases by 51%
or more, or decreases by 87% or more, an updated ETE analysis will be needed.
R.E. Ginna Nuclear Power Plant                    M3                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                    Rev. 1
 
Table M3. ETE Variation with Population Change Population Change                            Population Change Resident &
Shadow            Base        10%        25%        51%      Base        10%      25%      87%
Population        79,884      87,872    99,855 120,625 79,884              71,896    59,913    10,385 ETE for 90th Percentile Population Change                            Population Change Region          Base        10%        25%        51%      Base        10%      25%      87%
2MILE          1:50        1:50      1:50        1:50      1:50      1:50      1:50      1:35 5MILE          2:00        2:00      2:00        2:00      2:00      1:50      1:50      1:40 FULL EPZ          2:15        2:15      2:30        2:45      2:15      2:10      2:00      1:45 th ETE for 100 Percentile Population Change                            Population Change Region          Base        10%        25%        51%      Base        10%      25%      87%
2MILE          3:45        3:45      3:45        3:45      3:45      3:45      3:45      3:45 5MILE          3:50        3:50      3:50        3:50      3:50      3:50      3:50      3:50 FULL EPZ          3:55        3:55      3:55        4:10      3:55      3:55      3:55      3:55 R.E. Ginna Nuclear Power Plant                      M4                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                            Rev. 1
 
APPENDIX N ETE Criteria Checklist
 
N. ETE CRITERIA CHECKLIST Table N1. ETE Review Criteria Checklist NRC Review Criteria                            Criterion Addressed                    Comments in ETE Analysis 1.0 Introduction
: a. The emergency planning zone (EPZ) and surrounding area                        Yes        Section 1 should be described.
: b. A map should be included that identifies primary features                      Yes        Figure 11 of the site, including major roadways, significant topographical features, boundaries of counties, and population centers within the EPZ.
: c. A comparison of the current and previous ETE should be                        Yes        Table 13 provided and includes similar information as identified in Table 11, ETE Comparison, of NUREG/CR7002.
1.1 Approach
: a. A discussion of the approach and level of detail obtained                      Yes        Section 1.3 during the field survey of the roadway network should be provided.
: b. Sources of demographic data for schools, special facilities,                  Yes        Section 2.1 large employers, and special events should be identified.                                Section 3
: c. Discussion should be presented on use of traffic control                      Yes        Section 1.3, Section 2.2, Section 9, plans in the analysis.                                                                  Appendix G
: d. Traffic simulation models used for the analyses should be                      Yes        Section 1.3, Table 13, Appendix B, identified by name and version.                                                          Appendix C R.E. Ginna Nuclear Power Plant                                        N1                                                KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                              Rev. 1
 
NRC Review Criteria                Criterion Addressed                  Comments in ETE Analysis
: e. Methods used to address data uncertainties should be              Yes        Sections 2 and 3 described.                                                                Section 5, Appendix F 1.2 Assumptions
: a. The planning basis for the ETE includes the assumption            Yes        Section 2.3 - Assumption 1 that the evacuation should be ordered promptly and no                      Section 5.1 early protective actions have been implemented.
: b. Assumptions consistent with Table 12, General                  Yes        Sections 2.2, 2.3 Assumptions, of NUREG/CR7002 should be provided and include the basis to support their use.
1.3 Scenario Development
: a. The ten scenarios in Table 13, Evacuation Scenarios,            Yes        Tables 21, 62 should be developed for the ETE analysis, or a reason should be provided for use of other scenarios.
1.3.1 Staged Evacuation
: a. A discussion should be provided on the approach used in          Yes        Sections 5.4.2, 7.2 development of a staged evacuation.
1.4 Evacuation Planning Areas
: a. A map of EPZ with emergency response planning areas              Yes        Figure 61 (ERPAs) should be included.
: b. A table should be provided identifying the ERPAs                  Yes        Table 61, Table 75 considered for each ETE calculation by downwind direction in each sector.
R.E. Ginna Nuclear Power Plant                            N2                                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                                              Rev. 1
 
NRC Review Criteria                      Criterion Addressed                  Comments in ETE Analysis
: c. A table similar to Table 14, Evacuation Areas for a Staged          Yes        Table 61, Table 75 Evacuation Keyhole, of NUREG/CR7002 should be provided and includes the complete evacuation of the 2, 5, and 10 mile areas and for the 2 mile area/5 mile keyhole evacuations.
2.0 Demand Estimation
: a. Demand estimation should be developed for the four                    Yes        Section 3, Section 8, Appendix E population groups, including permanent residents of the EPZ, transients, special facilities, and schools.
2.1 Permanent Residents and Transient Population
: a. The US Census should be the source of the population                  Yes        Section 3.1 values, or another credible source should be provided.
: b. Population values should be adjusted as necessary for                  Yes        2010 used as the base year for analysis. No growth to reflect population estimates to the year of the                      growth of population necessary.
ETE.
: c. A sector diagram should be included, similar to Figure 21,            Yes        Figure 32 Population by Sector, of NUREG/CR7002, showing the population distribution for permanent residents.
2.1.1 Permanent Residents with Vehicles
: a. The persons per vehicle value should be between 1 and 2                Yes        1.92 persons per vehicle - Table 13 or justification should be provided for other values.
: b. Major employers should be listed.                                      Yes        Section 3.4, Appendix E 2.1.2 Transient Population R.E. Ginna Nuclear Power Plant                                  N3                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                    Rev. 1
 
NRC Review Criteria                        Criterion Addressed                  Comments in ETE Analysis
: a. A list of facilities which attract transient populations                Yes        Sections 3.3, 3.4, Appendix E should be included, and peak and average attendance for these facilities should be listed. The source of information used to develop attendance values should be provided.
: b. The average population during the season should be used,                Yes        Tables 34, 35 and Appendix E itemize the itemized and totaled for each scenario.                                          transient population and employee estimates. These estimates are multiplied by the scenario specific percentages provided in Table 63 to estimate transient population by scenario.
: c. The percent of permanent residents assumed to be at                      Yes        Sections 3.3, 3.4 facilities should be estimated.
: d. The number of people per vehicle should be provided.                    Yes        Sections 3.3, 3.4 Numbers may vary by scenario, and if so, discussion on why values vary should be provided.
: e. A sector diagram should be included, similar to Figure 21              Yes        Figure 36 - transients of NUREG/CR7002, showing the population distribution                            Figure 38 - employees for the transient population.
2.2 Transit Dependent Permanent Residents
: a. The methodology used to determine the number of transit                  Yes        Section 8.1, Table 81 dependent residents should be discussed.
: b. Transportation resources needed to evacuate this group                  Yes        Section 8.1, Tables 85, 810 should be quantified.
: c. The county/local evacuation plans for transit dependent                  Yes        Sections 8.1, 8.4, Table 810 residents should be used in the analysis.
R.E. Ginna Nuclear Power Plant                                    N4                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                        Rev. 1
 
NRC Review Criteria                        Criterion Addressed                  Comments in ETE Analysis
: d. The methodology used to determine the number of                            Yes        Section 8.5 people with disabilities and those with access and functional needs who may need assistance and do not reside in special facilities should be provided. Data from local/county registration programs should be used in the estimate, but should not be the only set of data.
: e. Capacities should be provided for all types of                            Yes        Section 2.3 - Assumption 10 transportation resources. Bus seating capacity of 50%                              Sections 3.5, 8.1, 8.2, 8.3 should be used or justification should be provided for higher values.
: f. An estimate of this population should be provided and                      Yes        Table 81 - transit dependents information should be provided that the existing                                    Section 8.5 - special needs registration programs were used in developing the estimate.
: g. A summary table of the total number of buses,                              Yes        Section 8.4 - page 86 ambulances, or other transport needed to support                                    Table 85 evacuation should be provided and the quantification of resources should be detailed enough to assure double counting has not occurred.
2.3 Special Facility Residents
: a. A list of special facilities, including the type of facility,              Yes        Table E3, Table 84 location, and average population should be provided.
Special facility staff should be included in the total special facility population.
: b. A discussion should be provided on how special facility                    Yes        Section 8.3 data was obtained.
R.E. Ginna Nuclear Power Plant                                      N5                                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                          Rev. 1
 
NRC Review Criteria                      Criterion Addressed                  Comments in ETE Analysis
: c. The number of wheelchair and bedbound individuals                      Yes        Section 3.5, Table E3, Table 84 should be provided.
: d. An estimate of the number and capacity of vehicles                      Yes        Section 8.3 needed to support the evacuation of the facility should be                      Tables 84, 85 provided.
: e. The logistics for mobilizing specially trained staff (e.g.,            Yes        Section 3.5, Section 8.4 medical support or security support for prisons, jails, and other correctional facilities) should be discussed when appropriate.
2.4 Schools
: a. A list of schools including name, location, student                    Yes        Table 82, Table E1, Table E2 population, and transportation resources required to                            Section 8.2 support the evacuation, should be provided. The source of this information should be provided.
: b. Transportation resources for elementary and middle                      Yes        Table 82 schools should be based on 100% of the school capacity.
: c. The estimate of high school students who will use their                Yes        Section 8.2 personal vehicle to evacuate should be provided and a basis for the values used should be discussed.
: d. The need for return trips should be identified if necessary.            Yes        Figure 81 Section 8.4, page 89 Tables 87 through 89 2.5.1 Special Events R.E. Ginna Nuclear Power Plant                                  N6                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                      Rev. 1
 
NRC Review Criteria                  Criterion Addressed                Comments in ETE Analysis
: a. A complete list of special events should be provided and            Yes        Section 3.7 includes information on the population, estimated duration, and season of the event.
: b. The special event that encompasses the peak transient              Yes        Section 3.7 population should be analyzed in the ETE.
: c. The percent of permanent residents attending the event              Yes        Section 3.7 should be estimated.
2.5.2 Shadow Evacuation
: a. A shadow evacuation of 20 percent should be included for            Yes        Section 2.2 - Assumption 5 areas outside the evacuation area extending to 15 miles                      Figure 21 from the NPP.
Section 3.2
: b. Population estimates for the shadow evacuation in the 10            Yes        Section 3.2 to 15 mile area beyond the EPZ are provided by sector.                      Figure 34 Table 33
: c. The loading of the shadow evacuation onto the roadway              Yes        Section 5 - Table 59 (footnote) network should be consistent with the trip generation time generated for the permanent resident population.
2.5.3 Background and Pass Through Traffic
: a. The volume of background traffic and pass through traffic          Yes        Section 3.6 is based on the average daytime traffic. Values may be                      Table 36 reduced for nighttime scenarios.
Section 6 Table 63 R.E. Ginna Nuclear Power Plant                              N7                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                  Rev. 1
 
NRC Review Criteria                      Criterion Addressed                Comments in ETE Analysis
: b. Pass through traffic is assumed to have stopped entering              Yes        Section 2.3 - Assumption 5 the EPZ about two hours after the initial notification.                        Section 3.6 2.6 Summary of Demand Estimation
: a. A summary table should be provided that identifies the                Yes total populations and total vehicles used in analysis for                      Section 3.8 permanent residents, transients, transit dependent                              Tables 37, 38 residents, special facilities, schools, shadow population, and passthrough demand used in each scenario.
3.0 Roadway Capacity
: a. The method(s) used to assess roadway capacity should be                Yes        Section 4 discussed.
3.1 Roadway Characteristics
: a. A field survey of key routes within the EPZ has been                  Yes        Section 1.3 conducted.
: b. Information should be provided describing the extent of                Yes        Section 1.3 the survey, and types of information gathered and used in the analysis.
: c. A table similar to that in Appendix A, Roadway                        Yes        Appendix K, Table K1 Characteristics, of NUREG/CR7002 should be provided.
: d. Calculations for a representative roadway segment should              Yes        Section 4 be provided.
R.E. Ginna Nuclear Power Plant                                  N8                                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                  Rev. 1
 
NRC Review Criteria                      Criterion Addressed                  Comments in ETE Analysis
: e. A legible map of the roadway system that identifies node                Yes        Appendix K numbers and segments used to develop the ETE should be provided and should be similar to Figure 31, Roadway Network Identifying Nodes and Segments, of NUREG/CR 7002.
3.2 Capacity Analysis
: a. The approach used to calculate the roadway capacity for                Yes        Section 4 the transportation network should be described in detail and identifies factors that should be expressly used in the modeling.
: b. The capacity analysis identifies where field information                Yes        Section 1.3, Section 4 should be used in the ETE calculation.
3.3 Intersection Control
: a. A list of intersections should be provided that includes the            Yes        Appendix K, Table K2 total number of intersections modeled that are unsignalized, signalized, or manned by response personnel.
: b. Characteristics for the 10 highest volume intersections                Yes        Table J1 within the EPZ are provided including the location, signal cycle length, and turn lane queue capacity.
: c. Discussion should be provided on how signal cycle time is              Yes        Section 4.1, Appendix C.
used in the calculations.
3.4 Adverse Weather
: a. The adverse weather condition should be identified and                  Yes        Table 21, Section 2.3 - Assumption 9 the effects of adverse weather on mobilization time                              Mobilization time - Table 22, Section 5.3 should be considered.
R.E. Ginna Nuclear Power Plant                                  N9                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                      Rev. 1
 
NRC Review Criteria                  Criterion Addressed                Comments in ETE Analysis
: b. The speed and capacity reduction factors identified in              Yes      Table 22 - based on HCM 2010. The Table 31, Weather Capacity Factors, of NUREG/CR7002                      factors provided in Table 31 of should be used or a basis should be provided for other                      NUREG/CR7002 are from HCM 2000.
values.
: c. The study identifies assumptions for snow removal on                Yes      Section 5.3, Appendix F Section F.3.3 streets and driveways, when applicable.
4.0 Development of Evacuation Times 4.1 Trip Generation Time
: a. The process used to develop trip generation times should            Yes      Section 5 be identified.
: b. When telephone surveys are used, the scope of the                    Yes      Appendix F survey, area of survey, number of participants, and statistical relevance should be provided.
: c. Data obtained from telephone surveys should be                      Yes      Appendix F summarized.
: d. The trip generation time for each population group should            Yes      Section 5, Appendix F be developed from site specific information.
4.1.1 Permanent Residents and Transient Population R.E. Ginna Nuclear Power Plant                              N10                                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                  Rev. 1
 
NRC Review Criteria                        Criterion Addressed                  Comments in ETE Analysis
: a. Permanent residents are assumed to evacuate from their                    Yes      Section 5 discusses trip generation for homes but are not assumed to be at home at all times.                              households with and without returning Trip generation time includes the assumption that a                                commuters. Table 63 presents the percentage of residents will need to return home prior to                          percentage of households with returning evacuating.                                                                        commuters and the percentage of households either without returning commuters or with no commuters.
Appendix F presents the percent households who will await the return of commuters.
: b. Discussion should be provided on the time and method                      Yes      Section 5 used to notify transients. The trip generation time                                Section 5.4.3  Waterways discusses any difficulties notifying persons in hard to reach areas such as on lakes or in campgrounds.
: c. The trip generation time accounts for transients                          Yes      Section 5, Figure 51 potentially returning to hotels prior to evacuating.
: d. Effect of public transportation resources used during                      Yes      Section 3.7 special events where a large number of transients should be expected should be considered.
: e. The trip generation time for the transient population                      Yes      Section 5, Table 59 should be integrated and loaded onto the transportation network with the general public.
4.1.2 Transit Dependent Residents R.E. Ginna Nuclear Power Plant                                    N11                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                        Rev. 1
 
NRC Review Criteria                      Criterion Addressed                  Comments in ETE Analysis
: a. If available, existing plans and bus routes should be used              Yes      Section 8.3, Table 810 in the ETE analysis. If new plans should be developed with the ETE, they have been agreed upon by the responsible authorities.
: b. Discussion should be included on the means of evacuating                Yes      Sections 8.4 and 8.5 ambulatory and nonambulatory residents.
: c. The number, location, and availability of buses, and other              Yes      Sections 8.4 and 8.5, Table 85 resources needed to support the demand estimation should be provided.
: d. Logistical details, such as the time to obtain buses, brief            Yes      Section 8.4, Figure 81 drivers, and initiate the bus route should be provided.
: e. Discussion should identify the time estimated for transit              Yes      Section 8.4, page 87 dependent residents to prepare and travel to a bus pickup point, and describes the expected means of travel to the pickup point.
: f. The number of bus stops and time needed to load                        Yes      Section 8.4 passengers should be discussed.
: g. A map of bus routes should be included.                                Yes      Figures 82 and 83
: h. The trip generation time for nonambulatory persons                    Yes      Section 8.5 includes the time to mobilize ambulances or special vehicles, time to drive to the home of residents, loading time, and time to drive out of the EPZ should be provided.
: i. Information should be provided to supports analysis of                Yes      Sections 8.4, 8.5 return trips, if necessary.                                                    Figure 81 Tables 811 through 813 R.E. Ginna Nuclear Power Plant                                  N12                                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                    Rev. 1
 
NRC Review Criteria                      Criterion Addressed                  Comments in ETE Analysis 4.1.3 Special Facilities
: a. Information on evacuation logistics and mobilization times              Yes      Section 8.4, Tables 814 through 816 should be provided.
: b. Discussion should be provided on the inbound and                        Yes      Section 8.4 outbound speeds.
: c. The number of wheelchair and bedbounds individuals                      Yes      Section 8.3, 8.4, Table 84 should be provided, and the logistics of evacuating these residents should be discussed.
: d. Time for loading of residents should be provided                        Yes      Sections 8.4,
: e. Information should be provided that indicates whether                    Yes      Section 8.4, Table 84 the evacuation can be completed in a single trip or if additional trips should be needed.
: f. If return trips should be needed, the destination of                    Yes      Sections 8.4 vehicles should be provided.
: g. Discussion should be provided on whether special facility                Yes      Section 8.4 residents are expected to pass through the reception center prior to being evacuated to their final destination.
: h. Supporting information should be provided to quantify the                Yes      Section 8.4. Tables 814 through 816.
time elements for the return trips.
4.1.4 Schools
: a. Information on evacuation logistics and mobilization time                Yes      Section 8.4 should be provided.
R.E. Ginna Nuclear Power Plant                                  N13                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                      Rev. 1
 
NRC Review Criteria                    Criterion Addressed                  Comments in ETE Analysis
: b. Discussion should be provided on the inbound and                      Yes      School bus speeds are presented in Tables outbound speeds.                                                              87 through 89.
Section 8.4  Outbound speeds are defined as the minimum of the evacuation route speed and the State school bus speed limit. Inbound speeds are limited to the State school bus speed limit.
: c. Time for loading of students should be provided.                      Yes      Section 8.4 Tables 87 through 89
: d. Information should be provided that indicates whether                  Yes      Section 8.4 - page 86 the evacuation can be completed in a single trip or if                        Table 85 additional trips are needed.
: e. If return trips are needed, the destination of school buses            Yes      Table 83  Destinations are the Receiving should be provided.                                                            Location and Reception Centers
: f. If used, reception centers should be identified. Discussion            Yes      Section 8 Introduction. Table 83. Students should be provided on whether students are expected to                        are evacuated to receiving locations or pass through the reception center prior to being                              reception centers where they will be evacuated to their final destination.                                          picked up by parents or guardians.
: g. Supporting information should be provided to quantify the              Yes      Tables 87, 88 and 89 provide time time elements for the return trips.                                            needed to arrive at pickup points/reception centers, which can be used to compute a second wave evacuation 4.2 ETE Modeling R.E. Ginna Nuclear Power Plant                                N14                                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                    Rev. 1
 
NRC Review Criteria                        Criterion Addressed                Comments in ETE Analysis
: a. General information about the model should be provided                    Yes      DYNEV II (Ver. 4.0.8.0). Section 1.3, Table and demonstrates its use in ETE studies.                                          13, Appendix B, Appendix C
: b. If a traffic simulation model is not used to conduct the ETE              No        Not applicable as a traffic simulation calculation, sufficient detail should be provided to validate                      model was used the analytical approach used. All criteria elements should have been met, as appropriate.
4.2.1 Traffic Simulation Model Input
: a. Traffic simulation model assumptions and a representative                  Yes      Appendices B and C describe the set of model inputs should be provided.                                            simulation model assumptions and algorithms Table J2
: b. A glossary of terms should be provided for the key                        Yes      Appendix A performance measures and parameters used in the                                    Tables C1, C2 analysis.
4.2.2 Traffic Simulation Model Output
: a. A discussion regarding whether the traffic simulation                      Yes      Appendix B model used must be in equilibration prior to calculating the ETE should be provided.
R.E. Ginna Nuclear Power Plant                                    N15                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                        Rev. 1
 
NRC Review Criteria                          Criterion Addressed                Comments in ETE Analysis
: b. The minimum following model outputs should be provided                        Yes          1. Table J5.
to support review:                                                                        2. Table J3.
: 1. Total volume and percent by hour at each EPZ exit                                      3. Table J1.
node.                                                                                4. Table J3.
: 2. Network wide average travel time.                                                      5. Figures J1 through J14 (one plot
: 3. Longest queue length for the 10 intersections with the                                    for each scenario considered).
highest traffic volume.                                                              6. Table J4. Network wide average
: 4. Total vehicles exiting the network.                                                      speed also provided in Table J3.
: 5. A plot that provides both the mobilization curve and evacuation curve identifying the cumulative percentage of evacuees who have mobilized and exited the EPZ.
: 6. Average speed for each major evacuation route that exits the EPZ.
: c. Color coded roadway maps should be provided for various                      Yes      Figures 73 through 77 times (i.e., at 2, 4, 6 hrs., etc.) during a full EPZ evacuation scenario, identifying areas where long queues exist including level of service (LOS) E and LOS F conditions, if they occur.
4.3 Evacuation Time Estimates for the General Public
: a. The ETE should include the time to evacuate 90% and                          Yes      Tables 71, 72 100% of the total permanent resident and transient population R.E. Ginna Nuclear Power Plant                                        N16                                          KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                          Rev. 1
 
NRC Review Criteria                    Criterion Addressed                  Comments in ETE Analysis
: b. The ETE for 100% of the general public should include all                Yes      Section 5.4 - truncating survey data to members of the general public. Any reductions or                                eliminate statistical outliers truncated data should be explained.                                              Table 72 - 100th percentile ETE for general public
: c. Tables should be provided for the 90 and 100 percent ETEs                Yes      Tables 73, 74 similar to Table 43, ETEs for Staged Evacuation Keyhole, of NUREG/CR7002.
: d. ETEs should be provided for the 100 percent evacuation of                Yes      Sections 8.4 through 8.6 special facilities, transit dependent, and school                                Tables 87 through 89 populations.
Tables 811 through 813 Tables 814 through 816 5.0 Other Considerations 5.1 Development of Traffic Control Plans
: a. Information that responsible authorities have approved                  Yes      Section 9, Appendix G the traffic control plan used in the analysis should be provided.
: b. A discussion of adjustments or additions to the traffic                  Yes      Section 9, Appendix G control plan that affect the ETE should be provided.
5.2 Enhancements in Evacuation Time
: a. The results of assessments for improvement of evacuation                Yes      Section 13, Appendix M time should be provided.
: b. A statement or discussion regarding presentation of                      Yes      Section 13 enhancements to local authorities should be provided.
5.3 State and Local Review R.E. Ginna Nuclear Power Plant                                  N17                                            KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                        Rev. 1
 
NRC Review Criteria                      Criterion Addressed                    Comments in ETE Analysis
: a. A list of agencies contacted and the extent of interaction              Yes          Table 11 with these agencies should be discussed.
: b. Information should be provided on any unresolved issues                Yes          No issues were determined after review that may affect the ETE.                                                          with the offsite agencies.
5.4 Reviews and Updates
: a. A discussion of when an updated ETE analysis is required                Yes          Appendix M, Section M.3 to be performed and submitted to the NRC.
5.5 Reception Centers and Congregate Care Center
: a. A map of congregate care centers and reception centers                  Yes          Figure 101 should be provided.
: b. If return trips are required, assumptions used to estimate              Yes          Sections 8.4 discusses a multiwave return times for buses should be provided.                                        evacuation procedure. Figure 81
: c. It should be clearly stated if it is assumed that passengers            Yes          Section 2.3 - Assumption 7h are left at the reception center and are taken by separate                        Section 10 buses to the congregate care center.
Technical Reviewer _______________________________                              Date _________________________
Supervisory Review _______________________________                              Date _________________________
R.E. Ginna Nuclear Power Plant                                  N18                                              KLD Engineering, P.C.
Evacuation Time Estimate                                                                                                        Rev. 1}}

Latest revision as of 19:24, 11 January 2025

Kld TR-518, Final Report, Rev. 1, R. E. Ginna Nuclear Power Plant Development of Evacuation Time Estimates
ML13004A004
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/30/2012
From:
KLD Engineering, PC
To:
Constellation Energy Nuclear Group, EDF Group, Office of Nuclear Reactor Regulation
References
KLD TR-518, Rev 1
Download: ML13004A004 (447)


Text