{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 8, 2014 LICENSEE:     Northern States Power Company - Minnesota FACILITY:     Monticello Nuclear Generating Plant Prairie Island Nuclear Generating Plant, Units 1 and 2
{{#Wiki_filter:LICENSEE:
FACILITY:  


==SUBJECT:==
==SUBJECT:==
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 8, 2014 Northern States Power Company - Minnesota Monticello Nuclear Generating Plant Prairie Island Nuclear Generating Plant, Units 1 and 2


==SUMMARY==
==SUMMARY==
OF AUGUST 5, 2014, CLOSED MEETING BElWEEN REPRESENTATIVES OF THE U.S. ARMY CORPS OF ENGINEERS, U.S.
OF AUGUST 5, 2014, CLOSED MEETING BElWEEN REPRESENTATIVES OF THE U.S. ARMY CORPS OF ENGINEERS, U.S.
NUCLEAR REGULATORY COMMISSION, AND NORTHERN STATES POWER COMPANY- MINNESOTA TO DISCUSS FLOODING ANALYSIS ASSOCIATED WITH MONTICELLO NUCLEAR GENERATING PLANT AND PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 (TAC NOS. MF3696, MF3697 AND MF3698)
NUCLEAR REGULATORY COMMISSION, AND NORTHERN STATES POWER COMPANY-MINNESOTA TO DISCUSS FLOODING ANALYSIS ASSOCIATED WITH MONTICELLO NUCLEAR GENERATING PLANT AND PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 (TAC NOS. MF3696, MF3697 AND MF3698)
On August 5, 2014, the U.S. Nuclear Regulatory Commission (NRC) staff held a closed meeting with the U.S. Army Corps of Engineers (USAGE), and Northern States Power Company-Minnesota, doing business as Xcel Energy (Xcel), to discuss the flooding hazard reevaluation (FHR) for the Monticello Nuclear Generating Plant (MNGP) and Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. The meeting was held at USAGE's offices in Saint Paul, Minnesota. The closed meeting notice dated July 24, 2014, can be found in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML14205A524. The agenda for the August 5, 2014, meeting, including the list of attendees, can be found in Enclosure 1. Prior to the meeting Xcel provided a list of questions associated with the USAGE FHR for the MNGP and PINGP sites. These questions were discussed during the meeting. The questions and their answers can be found in Enclosure 2.
On August 5, 2014, the U.S. Nuclear Regulatory Commission (NRC) staff held a closed meeting with the U.S. Army Corps of Engineers (USAGE), and Northern States Power Company-Minnesota, doing business as Xcel Energy (Xcel), to discuss the flooding hazard reevaluation (FHR) for the Monticello Nuclear Generating Plant (MNGP) and Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. The meeting was held at USAGE's offices in Saint Paul, Minnesota. The closed meeting notice dated July 24, 2014, can be found in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML14205A524. The agenda for the August 5, 2014, meeting, including the list of attendees, can be found in Enclosure 1. Prior to the meeting Xcel provided a list of questions associated with the USAGE FHR for the MNGP and PINGP sites. These questions were discussed during the meeting. The questions and their answers can be found in Enclosure 2.
The purpose of the meeting was to discuss the portion of the FHR the USAGE is performing under contract to the NRC for MNGP and PINGP, Units 1 and 2. By letters dated March 5, 2014, Xcel requested NRC assistance in having the USAGE perform a dam failure analysis for the Mississippi watershed for MNGP and PINGP, Units 1 and 2 (ADAMS Accession Nos.
The purpose of the meeting was to discuss the portion of the FHR the USAGE is performing under contract to the NRC for MNGP and PINGP, Units 1 and 2. By letters dated March 5, 2014, Xcel requested NRC assistance in having the USAGE perform a dam failure analysis for the Mississippi watershed for MNGP and PINGP, Units 1 and 2 (ADAMS Accession Nos.
ML14065A112 and ML14064A291, respectively). Xcel requested the NRC's assistance to support Xcel's development of a MNGP and PINGP, Units 1 and 2 flooding hazard reevaluation report (FHRR) in response to the March 12, 2012, request for information issued pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) (ADAMS Accession No. ML12073A348).
ML14065A112 and ML14064A291, respectively). Xcel requested the NRC's assistance to support Xcel's development of a MNGP and PINGP, Units 1 and 2 flooding hazard reevaluation report (FHRR) in response to the March 12, 2012, request for information issued pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) (ADAMS Accession No. ML12073A348).
Meeting Highlights The USAGE described the results of the screening process it performed on the dams upstream of the MGNP and PINGP sites. Consistent with guidance outlined in Japan Lessons-Learned Project Directorate (JLD) Interim Staff Guidance (ISG) JLD-ISG-2013-01, "Guidance for Assessment of Flooding Hazards Due to Dam Failure," (ADAMS Accession No. ML13151A153) the USAGE performed an analysis of the 180 dams upstream of Monticello, and 618 dams upstream of Prairie Island, and determined that there are no "potentially critical" dams that
Meeting Highlights The USAGE described the results of the screening process it performed on the dams upstream of the MGNP and PINGP sites. Consistent with guidance outlined in Japan Lessons-Learned Project Directorate (JLD) Interim Staff Guidance (ISG) JLD-ISG-2013-01, "Guidance for Assessment of Flooding Hazards Due to Dam Failure," (ADAMS Accession No. ML13151A153) the USAGE performed an analysis of the 180 dams upstream of Monticello, and 618 dams upstream of Prairie Island, and determined that there are no "potentially critical" dams that warrant a more detailed dam breach analysis. Although no dams have been identified as "potentially critical" dams, in accordance with the JLD-ISG-2013-01, USAGE will be providing the NRC with a recommendation regarding modeling of a basin-wide probable maximum flood (PMF).
 
warrant a more detailed dam breach analysis. Although no dams have been identified as "potentially critical" dams, in accordance with the JLD-ISG-2013-01, USAGE will be providing the NRC with a recommendation regarding modeling of a basin-wide probable maximum flood (PMF).
Regarding the PINGP basin-wide PMF, USAGE indicated that a PMF was developed in 1985 for a dam and lock that is immediately downstream of the PINGP site. USAGE considers this PMF to be relevant to PINGP and it is likely that a USAGE detailed model for the PINGP basin-wide PMF will not be needed.
Regarding the PINGP basin-wide PMF, USAGE indicated that a PMF was developed in 1985 for a dam and lock that is immediately downstream of the PINGP site. USAGE considers this PMF to be relevant to PINGP and it is likely that a USAGE detailed model for the PINGP basin-wide PMF will not be needed.
Regarding the Monticello basin-wide PMF, USAGE indicated that there is no modern basin-wide PMF that is available for this site and that USAGE will most likely recommend to the NRC that a basin-wide PMF be developed. If the USAGE does develop a basin-wide PMF analysis for Monticello it will be developed in accordance with current guidance and the USAGE will also use its knowledge of the river basin and characteristics of the dams in the basin to develop the Monticello basin-wide PMF analysis.
Regarding the Monticello basin-wide PMF, USAGE indicated that there is no modern basin-wide PMF that is available for this site and that USAGE will most likely recommend to the NRC that a basin-wide PMF be developed. If the USAGE does develop a basin-wide PMF analysis for Monticello it will be developed in accordance with current guidance and the USAGE will also use its knowledge of the river basin and characteristics of the dams in the basin to develop the Monticello basin-wide PMF analysis.
The following action items resulted from the meeting:
The following action items resulted from the meeting:
* To aid in the USAGE's development of a PMF model for Monticello, Xcel will provide a list of the calculations and models that they are developing with target dates for when this information will be available. The NRC will review the list and then inform Xcel of the calculations and models that would be helpful to aid in the development of the USAGE's Monticello PMF model. Subsequent to the meeting Xcel provided the list of Monticello PMF calculations. This list can be found in Enclosure 3.
To aid in the USAGE's development of a PMF model for Monticello, Xcel will provide a list of the calculations and models that they are developing with target dates for when this information will be available. The NRC will review the list and then inform Xcel of the calculations and models that would be helpful to aid in the development of the USAGE's Monticello PMF model. Subsequent to the meeting Xcel provided the list of Monticello PMF calculations. This list can be found in Enclosure 3.
* Xcel will provide a list of the calculations being developed for Prairie Island and the NRC may request these calculations to assess what, if any, differences there are between the basin-wide PMF for Prairie Island that USAGE believes is relevant and Xcel's calculations. Subsequent to the meeting Xcel provided the list of Prairie Island PMF calculations. This list can be found in Enclosure 4.
Xcel will provide a list of the calculations being developed for Prairie Island and the NRC may request these calculations to assess what, if any, differences there are between the basin-wide PMF for Prairie Island that USAGE believes is relevant and Xcel's calculations. Subsequent to the meeting Xcel provided the list of Prairie Island PMF calculations. This list can be found in Enclosure 4.
* Xcel will provide a list of locations for hydrographs that Xcel would like to have for the USACE basin-wide PMF analysis. Subsequent to the meeting Xcel identified the hydrograph locations. The locations can be found in Enclosure 5.
Xcel will provide a list of locations for hydrographs that Xcel would like to have for the USACE basin-wide PMF analysis. Subsequent to the meeting Xcel identified the hydrograph locations. The locations can be found in Enclosure 5.
* Xcel will determine whether it would like to have PMF levels for secondary events. There was a discussion that the Monticello basin-wide PMF will most likely be based on a rain on snow event. Xcel indicated that although a summer PMF may lead to lower levels at the site, the flood may arrive at the site sooner than the rain on snow event and there could be some benefit in gaining insights from such a secondary event.
Xcel will determine whether it would like to have PMF levels for secondary events. There was a discussion that the Monticello basin-wide PMF will most likely be based on a rain on snow event. Xcel indicated that although a summer PMF may lead to lower levels at the site, the flood may arrive at the site sooner than the rain on snow event and there could be some benefit in gaining insights from such a secondary event.
Subsequent to the meeting Xcel informed the NRC staff that it would not request USAGE to perform evaluations of any secondary flood events.
Subsequent to the meeting Xcel informed the NRC staff that it would not request USAGE to perform evaluations of any secondary flood events.
* The NRC took an action to determine whether or not if in addition to providing the hydrographs associated with PMF study, which it believes is relevant to Prairie Island, if USAGE would be willing to provide the details, including assumptions, associated with this PMF study. Xcel indicated that having the USAGE PMF study as soon as possible, if available, would be helpful in its efforts of developing its own basin-wide PMF for Prairie Island which it intends to base on a site-specific probable maximum precipitation model.
The NRC took an action to determine whether or not if in addition to providing the hydrographs associated with PMF study, which it believes is relevant to Prairie Island, if USAGE would be willing to provide the details, including assumptions, associated with this PMF study. Xcel indicated that having the USAGE PMF study as soon as possible, if available, would be helpful in its efforts of developing its own basin-wide PMF for Prairie Island which it intends to base on a site-specific probable maximum precipitation model.
The USAGE was provided an opportunity to comment on this summary prior to its issuance and their comments were addressed in the final version of this summary.
The USAGE was provided an opportunity to comment on this summary prior to its issuance and their comments were addressed in the final version of this summary.
Docket Nos. 50-263, 50-282, and 50-306
Docket Nos. 50-263, 50-282, and 50-306  


==Enclosures:==
==Enclosures:==
Line 48: Line 48:
: 3. Monticello Related Probable Maximum Flood Calculations
: 3. Monticello Related Probable Maximum Flood Calculations
: 4. Prairie Island Probable Maximum Flood Calculations
: 4. Prairie Island Probable Maximum Flood Calculations
: 5. Location of Hydrographs for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant (PINGP) cc w/encls: Distribution via ListServ
: 5. Location of Hydrographs for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant (PINGP) cc w/encls: Distribution via ListServ  


NRC/USACE Scoping Meeting Monticello and Prairie Island NPPs US Army Corps of Engineers                            Aug 5, 2014 USACE St. Paul District Office
US Army Corps of Engineers NRC/USACE Scoping Meeting Monticello and Prairie Island NPPs Aug 5, 2014
('\~U.S.NRC                               Executive Conference Room, 7th Floor Protecting People tUld the F111 ironment 1
('\\~U.S.NRC USACE St. Paul District Office Executive Conference Room, 7th Floor 180 5th St E Protecting People tUld the F111 1ironment St Paul, MN 55101 Attendees:
180 5th St E St Paul, MN 55101 Attendees:                                 NRC:   Andy Campbell, Ken See, Brad Harvey, Joe Sebrosky USACE Omaha:       Roger Kay, Teresa Reinig, Chris Passero USACE St. Paul:     Doug Crum, Corby Lewis, Bonnie Greenleaf, Jim Ulrick Xcel Energy: Marty Murphy, Brian Zelenak, Richard Rohrer, Bill Partridge, Steve Kaas Black & Veatch:   Pablo Gonzalez-Quesada, Frank Means
NRC:
                                              ----- Agenda Topics -----
Andy Campbell, Ken See, Brad Harvey, Joe Sebrosky USACE Omaha:
TUESDAY MORNING AUGUST 5 Licensee Meeting Arrival for Security Screening                                               NRC/FERC/Xcel         08:45-09:00 Introductions                                                                       ALL           09:00- 09:15
Roger Kay, Teresa Reinig, Chris Passero USACE St. Paul:
* Upper Mississippi River Watershed Management                                 USACE             09:15- 09:45
Doug Crum, Corby Lewis, Bonnie Greenleaf, Jim Ulrick Xcel Energy:
* Hydrologic and Hydraulic Modeling Methods and                               USACE             09:45- 10:15 Results
Marty Murphy, Brian Zelenak, Richard Rohrer, Bill Partridge, Steve Kaas Black & Veatch:
* Licensee's questions and answers (see next page)                       Xcel/NRC/USACE         10:15-11:00 BREAK                                                     11 :00 - 11:30 Continued discussions as necessary                                         Xcel/NRCIUSACE         11:30- 12:00 Enclosure 1
Pablo Gonzalez-Quesada, Frank Means  
----- Agenda Topics -----
TUESDAY MORNING AUGUST 5 Licensee Meeting Arrival for Security Screening NRC/FERC/Xcel 08:45-09:00  
 
===Introductions===
ALL 09:00- 09:15
* Upper Mississippi River Watershed Management USACE 09:15- 09:45
* Hydrologic and Hydraulic Modeling Methods and USACE 09:45-10:15 Results
* Licensee's questions and answers (see next page)
Xcel/NRC/USACE 10:15-11:00 BREAK 11 :00 - 11:30 Continued discussions as necessary Xcel/NRCIUSACE 11:30- 12:00  


Xcel Questions Associated With U.S. Army Corps of Engineers Flooding Hazard Reevaluation
Xcel Questions Associated With U.S. Army Corps of Engineers Flooding Hazard Reevaluation
: 1. For each dam listed in the March 05, 2014 letters [Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML14065A112 and ML14064A291],
: 1.
please provide the inflow and outflow hydrographs at the location of the dam under the following scenarios: all season probable maximum flood (PMF), snow season PMF, spillway design flood (SDF), 500-yr flood, 25-year flood, and "sunny day" breach. (500-yr and 25-yr- only required if seismic failure is found to be credible)
For each dam listed in the {{letter dated|date=March 05, 2014|text=March 05, 2014 letter}}s [Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML14065A112 and ML14064A291],
please provide the inflow and outflow hydrographs at the location of the dam under the following scenarios: all season probable maximum flood (PMF), snow season PMF, spillway design flood (SDF), 500-yr flood, 25-year flood, and "sunny day" breach. (500-yr and 25-yr-only required if seismic failure is found to be credible)
USACE I NRC Answer: The U.S. Army Corps of Engineers (USACE) has performed a preliminary screening review using the Interim Staff Guidance (ISG) to identify non-critical dams. The results show that all dams upstream of both Nuclear Power Plant (NPP) sites are potentially screened out.
USACE I NRC Answer: The U.S. Army Corps of Engineers (USACE) has performed a preliminary screening review using the Interim Staff Guidance (ISG) to identify non-critical dams. The results show that all dams upstream of both Nuclear Power Plant (NPP) sites are potentially screened out.
For the basin-wide PMPIPMF, the USACE will determine if any credible dam failure scenarios would impact the PMF elevation. The USACE will route the resulting hydrographs using their hydrologic I hydraulic models.
For the basin-wide PMPIPMF, the USACE will determine if any credible dam failure scenarios would impact the PMF elevation. The USACE will route the resulting hydrographs using their hydrologic I hydraulic models.
Line 68: Line 78:
The process we are proposing involves a meeting among the licensees, the U.S.
The process we are proposing involves a meeting among the licensees, the U.S.
Nuclear Regulatory Commission (NRC), and USACE after the hydrographs are provided. During this meeting, any and all questions will be answered by subject matter experts (SMEs) from the USACE and NRC. Due to the sensitive security-related information in the report, the report will not be provided. The intent of the meeting is to give each licensee's representatives an opportunity to understand all of the inputs and assumptions in the analysis. We will request a preliminary list of questions be submitted in advance, and recommend you take advantage of the opportunity to the fullest extent.
Nuclear Regulatory Commission (NRC), and USACE after the hydrographs are provided. During this meeting, any and all questions will be answered by subject matter experts (SMEs) from the USACE and NRC. Due to the sensitive security-related information in the report, the report will not be provided. The intent of the meeting is to give each licensee's representatives an opportunity to understand all of the inputs and assumptions in the analysis. We will request a preliminary list of questions be submitted in advance, and recommend you take advantage of the opportunity to the fullest extent.
: 2. Please describe how cascading effects of dam breaches are accounted for during the events listed above considering that there will be in-line USACE dams and non-USACE dams both upstream and downstream of the individual dams.
: 2.
Please describe how cascading effects of dam breaches are accounted for during the events listed above considering that there will be in-line USACE dams and non-USACE dams both upstream and downstream of the individual dams.
USACE I NRC Answer: The USACE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
USACE I NRC Answer: The USACE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
For the basin-wide PMPIPMF, the USACE will determine if any credible dam failure scenarios would impact the PMF elevation. The USACE will route the resulting hydrographs using their hydrologic I hydraulic models.
For the basin-wide PMPIPMF, the USACE will determine if any credible dam failure scenarios would impact the PMF elevation. The USACE will route the resulting hydrographs using their hydrologic I hydraulic models.
Enclosure 2
: 3.
: 3. For each dam listed, please determine and describe whether a dam failure is credible during a seismic event per [Japan Lessons-Learned Project Directorate (JLD)]
For each dam listed, please determine and describe whether a dam failure is credible during a seismic event per [Japan Lessons-Learned Project Directorate (JLD)]
JLD-ISG-2013-01 and NUREGICR-7046.
JLD-ISG-2013-01 and NUREGICR-7046.
USACE I NRC Answer: The USACE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
USACE I NRC Answer: The USACE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
: 4. For each dam listed, please determine and describe whether a dam failure is credible during the dam's PMF or SDF per JLD-ISG-2013-01 and NUREGICR-7046.
: 4.
For each dam listed, please determine and describe whether a dam failure is credible during the dam's PMF or SDF per JLD-ISG-2013-01 and NUREGICR-7046.
USACE I NRC Answer: The USACE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
USACE I NRC Answer: The USACE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
: 5. For each dam listed, please determine and describe whether a dam failure is credible during the Monticello Nuclear Generating Plant I Prairie Island Nuclear Plant watershed-wide PMP and snow season PMPisnowmelt combinations per JLD-ISG-2013-01 and NUREGICR-7046.
: 5.
For each dam listed, please determine and describe whether a dam failure is credible during the Monticello Nuclear Generating Plant I Prairie Island Nuclear Plant watershed-wide PMP and snow season PMPisnowmelt combinations per JLD-ISG-2013-01 and NUREGICR-7046.
USACE I NRC Answer: The NRC and USACE have not begun that phase of the project. For the basin-wide PMPIPMF, the USACE will determine if any credible dam failure scenarios would impact the PMF elevation. The USACE will route the resulting hydrographs using their hydrologic I hydraulic models.
USACE I NRC Answer: The NRC and USACE have not begun that phase of the project. For the basin-wide PMPIPMF, the USACE will determine if any credible dam failure scenarios would impact the PMF elevation. The USACE will route the resulting hydrographs using their hydrologic I hydraulic models.
: 6. Please state whether the USACE dam breach hydrographs are consistent with the watershed-wide all season probable maximum precipitation (PMP) and snow season PMPisnowmelt combinations per JLD-ISG-2013-01 and NUREGICR-7046. If the hydrographs are not consistent with these inputs, then please describe the differences.
: 6.
Please state whether the USACE dam breach hydrographs are consistent with the watershed-wide all season probable maximum precipitation (PMP) and snow season PMPisnowmelt combinations per JLD-ISG-2013-01 and NUREGICR-7046. If the hydrographs are not consistent with these inputs, then please describe the differences.
USACE I NRC Answer: Clarification is necessary. The USACE will provide the bounding basin-wide PMP scenario for each NPP site. For the PMF analysis, USACE will use appropriate dam breach assumptions as necessary analysis following JLD-ISG-2013-01 guidance.
USACE I NRC Answer: Clarification is necessary. The USACE will provide the bounding basin-wide PMP scenario for each NPP site. For the PMF analysis, USACE will use appropriate dam breach assumptions as necessary analysis following JLD-ISG-2013-01 guidance.
: 7. If the USACE is not able to provide hydrographs at the location of the individual dams, please describe whether hydrographs can be provided at other specific locations within the watershed; e.g. location of hypothetical dams. Xcel Energy would provide these locations to the USACE according to modeling needs.
: 7.
If the USACE is not able to provide hydrographs at the location of the individual dams, please describe whether hydrographs can be provided at other specific locations within the watershed; e.g. location of hypothetical dams. Xcel Energy would provide these locations to the USACE according to modeling needs.
USACE I NRC Answer: The USACE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
USACE I NRC Answer: The USACE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
Each licensee will be given in electronic form hydrographs (stage, flow and velocity) at each NPP site. The licensees may request additional hydrographs (stage, flow &
Each licensee will be given in electronic form hydrographs (stage, flow and velocity) at each NPP site. The licensees may request additional hydrographs (stage, flow &
velocity) at other locations between the federal dams immediately upstream or downstream from each NPP.
velocity) at other locations between the federal dams immediately upstream or downstream from each NPP.
: 8. Please provide the USAGE's assumptions and approach to establishing the initial (starting) pool elevations at the beginning of the flood (for failure mechanisms other than sunny-day). The Dam Failure ISG states the default starting water surface elevation should be the maximum normal pool elevation (i.e., the top of the active storage pool) but that other starting water surface elevations may be used, with appropriate justification (e.g. operating rules and history).
: 8.
Please provide the USAGE's assumptions and approach to establishing the initial (starting) pool elevations at the beginning of the flood (for failure mechanisms other than sunny-day). The Dam Failure ISG states the default starting water surface elevation should be the maximum normal pool elevation (i.e., the top of the active storage pool) but that other starting water surface elevations may be used, with appropriate justification (e.g. operating rules and history).
USACE I NRC Answer: The USAGE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
USACE I NRC Answer: The USAGE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
The USAGE will provide the bounding basin-wide PMP scenario for each NPP site. For the PMF analysis, USAGE will use appropriate starting water surface elevations as necessary analysis following JLD-ISG-2013-01 guidance. This analysis has not been initiated.
The USAGE will provide the bounding basin-wide PMP scenario for each NPP site. For the PMF analysis, USAGE will use appropriate starting water surface elevations as necessary analysis following JLD-ISG-2013-01 guidance. This analysis has not been initiated.
: 9. Please describe the USAGE's approach to how failure will be triggered in the hydrologic model for the hydrologic dam failure mechanism. For example, failure could be triggered at the maximum pool during the flood, as determined by the model; the model then works out the combination of hydrographs downstream. The approach does not force peak flows from upstream dam failures to reach the plants simultaneously.
: 9.
Please describe the USAGE's approach to how failure will be triggered in the hydrologic model for the hydrologic dam failure mechanism. For example, failure could be triggered at the maximum pool during the flood, as determined by the model; the model then works out the combination of hydrographs downstream. The approach does not force peak flows from upstream dam failures to reach the plants simultaneously.
USACE I NRC Answer: The USAGE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
USACE I NRC Answer: The USAGE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
For the PMF analysis, USAGE will use engineering judgment to determine the hydraulic dam failure mechanisms as appropriate. This analysis has not been initiated.
For the PMF analysis, USAGE will use engineering judgment to determine the hydraulic dam failure mechanisms as appropriate. This analysis has not been initiated.
: 10. Please describe the method(s) for developing the breach parameters.
: 10.
Please describe the method(s) for developing the breach parameters.
USACE I NRC Answer: The USAGE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
USACE I NRC Answer: The USAGE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
For the PMF analysis, USAGE will use accepted methods and engineering judgment to determine the breach parameters as appropriate. This analysis has not been initiated.
For the PMF analysis, USAGE will use accepted methods and engineering judgment to determine the breach parameters as appropriate. This analysis has not been initiated.
: 11. Please describe the method(s) for routing the breach and flood hydrographs to the plants.
: 11.
Please describe the method(s) for routing the breach and flood hydrographs to the plants.
USACE I NRC Answer: The USAGE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
USACE I NRC Answer: The USAGE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.
For the PMF analysis, USAGE and NRC are in the process of determining the path forward in terms of modeling approach. For new PMP/PMF analysis at other sites, HEC-HMS and HEC-RAS will be utilized.
For the PMF analysis, USAGE and NRC are in the process of determining the path forward in terms of modeling approach. For new PMP/PMF analysis at other sites, HEC-HMS and HEC-RAS will be utilized.
: 12. If the USAGE is unable to provide all the data requested, [Northern States Power Minnesota] NSPM would like to know which items will be provided.
: 12.
If the USAGE is unable to provide all the data requested, [Northern States Power Minnesota] NSPM would like to know which items will be provided.
USACE I NRC Answer: Each licensee will be given in electronic form hydrographs (stage, flow and velocity) at each NPP site. The licensees may request additional hydrographs (stage, flow & velocity) at other locations between the federal dams immediately upstream or downstream from each NPP.
USACE I NRC Answer: Each licensee will be given in electronic form hydrographs (stage, flow and velocity) at each NPP site. The licensees may request additional hydrographs (stage, flow & velocity) at other locations between the federal dams immediately upstream or downstream from each NPP.
The process we are proposing involves a meeting among the licensees, NRC, and USAGE after the hydrographs are provided. During this meeting, any and all questions will be answered by SME(s) from the USAGE and NRC. Due to the sensitive security-related information in the report, the report will not be provided. The intent of the meeting is to give each licensee's representatives an opportunity to understand all of the inputs and assumptions in the analysis. We will request a preliminary list of questions be submitted in advance, and recommend you take advantage of the opportunity to the fullest extent.
The process we are proposing involves a meeting among the licensees, NRC, and USAGE after the hydrographs are provided. During this meeting, any and all questions will be answered by SME(s) from the USAGE and NRC. Due to the sensitive security-related information in the report, the report will not be provided. The intent of the meeting is to give each licensee's representatives an opportunity to understand all of the inputs and assumptions in the analysis. We will request a preliminary list of questions be submitted in advance, and recommend you take advantage of the opportunity to the fullest extent.
Monticello Probable Maximum Flood Related Calculations cakulation Condition on Target Calculation                   Purpose of C<Jkulation         Target Date D<Jte Site Specrftc PMP                cakulatton determines Site specrf*c all-season PMP lt also determmes the snow-season PMP and provides a             8/29/2014                      Draft meteorolocical tnne senes tdew pomt temperature and w1nds speed) used to define snowmelt condrtions durinc the snow-season PMP. These values are used as an mput to determine tne PMF for the watershed.                         9/12/2014                  Approved Storm E'<'ents MeteorologJ<:al  Historical meteorologiCal data has been     915/2014                      Draft Data                            compiled for the April 1965 and Apnl 2001 events. Data sncludes precipitation.
Monticello Probable Maximum Flood Related Calculations Calculation Site Specrftc PMP Storm E'<'ents MeteorologJ<:al Data Purpose of C<Jkulation cakulatton determines Site specrf*c all-season PMP lt also determmes the snow-season PMP and provides a meteorolocical tnne senes tdew pomt temperature and w1nds speed) used to define snowmelt condrtions durinc the snow-season PMP. These values are used as an mput to determine tne PMF for the watershed.
dew pomt temperature and snow pack data. Also, snow water equiValent ts 9/19/2014                  Appro**ed calculated from snow pack data and other meteorological data. These data are used as tnputs to Glilbrate the HEC-HMS model.
Historical meteorologiCal data has been compiled for the April 1965 and Apnl 2001 events. Data sncludes precipitation.
180999.51.1003. PMF H~*drology I Thrs GllculatJOn has two components.                       CalculatiOn is m an unapproved
dew pomt temperature and snow pack data. Also, snow water equiValent ts calculated from snow pack data and other meteorological data. These data are used as tnputs to Glilbrate the HEC-HMS model.
* Calculatton uses tustoricai                       state pending the followmg.
180999.51.1003. PMF H~*drology I Thrs GllculatJOn has two components.
prectpnatton. snow water content and streamgage data to
Calculatton uses tustoricai prectpnatton. snow water content and streamgage data to caltbrate tne HEC-HMS model The calibrated model is then used to Gllculate runoff due to prectpnat10n and snowmelt and routes the runoff to points Target Date 8/29/2014 9/12/2014 915/2014 9/19/2014 8/29/2014 cakulation Condition on Target D<Jte Draft Approved Draft Appro**ed CalculatiOn is m an unapproved state pending the followmg.
* Refinement of calibratiOn caltbrate tne HEC-HMS model                         Parameters. calibration has 8/29/2014 been completed using limllted
* Refinement of calibratiOn Parameters. calibration has been completed using limllted meteorological data that results m a conservatiVe appronmation of calibrated parameters. AdditiOnal  
* The calibrated model is then                         meteorological data that used to Gllculate runoff due to                     results m a conservatiVe prectpnat10n and snowmelt and                       appronmation of calibrated routes the runoff to points                         parameters. AdditiOnal Enclosure 3


calculation condition on Tarcet I C,a&culation Purpose of calculation         Tarr:et Date                                     I I
C,a&culation Purpose of calculation Tarr:et Date calculation condition on Tarcet I I
Date               I upstream of the site usmg the                     meteorologiCal data has bee-n calibrated HfC*HMS model                         comptle-d that wouid allow further refinement of the calibration
Date I I upstream of the site usmg the meteorologiCal data has bee-n calibrated HfC*HMS model comptle-d that wouid allow further refinement of the calibration
* Development of the new site specrfic preapitation and snowmelt u,napprowd calcu,iation mputs are based on PMP *lalues from HMR-51/52/53. Thts calculation would be updated with mputs based on site specific PMP valu,es.
* Development of the new site specrfic preapitation and snowmelt u,napprowd calcu,iation mputs are based on PMP *lalues from HMR-51/52/53. Thts calculation would be updated with mputs based on site specific PMP valu,es.  
                                                          !t ts not dear that this calculation tn its current state would be of any use for the US.ACE analySts
!t ts not dear that this calculation tn its current state would be of any use for the US.ACE analySts  
                                                          !t would be expected that the USACf would perform callbrattons/vahdations of ther routmg models cak:ulation condition on Target Calculation                     Purpose of c.alcutaion           nrget~te Date 180999.51.1006, MNGP           catculatton determined precipitatiOn and Probable Maxmum PrecipitatiOn snov.*melt for determminc run-off for the and Scnowmelt                 w-atershed. As part of the t\terarchteal approach, the calculation was conservatr.<ely performed usutg PMP                     caiculatton is m an unapproved values based on HMR-51/52/53. Thts state pending recetpt of the calculatton also uses conservatrve tnputs from the site specific PMP parameters for estmattng snowmelt.
!t would be expected that the USACf would perform callbrattons/vahdations of ther routmg models Calculation Purpose of c.alcutaion nrget~te cak:ulation condition on Target Date 180999.51.1006, MNGP catculatton determined precipitatiOn and Probable Maxmum PrecipitatiOn snov.*melt for determminc run-off for the and Scnowmelt w-atershed. As part of the t\\terarchteal approach, the calculation was conservatr.<ely performed usutg PMP caiculatton is m an unapproved values based on HMR-51/52/53. Thts state pending recetpt of the calculatton also uses conservatrve tnputs from the site specific PMP parameters for estmattng snowmelt.
and further refinements of The conservative approXJrnattOns used tn     8/29/2014 snowmelt calculatJOns.
and further refinements of The conservative approXJrnattOns used tn 8/29/2014 snowmelt calculatJOns.
this calculation are mtended to be superseded by the site specific PMP
this calculation are mtended to be superseded by the site specific PMP  
                                                                                      !t 15 not dear that this calculatton nput, and corresponding meteorologteal                 n its current state would be of conditions (dew potnt temperatures and                 any use for the USACE analysts.
!t 15 not dear that this calculatton nput, and corresponding meteorologteal n its current state would be of conditions (dew potnt temperatures and any use for the USACE analysts.
Wlnd speeds) that are conStstent wrth the site specific PMP.
Wlnd speeds) that are conStstent wrth the site specific PMP.
180999.51.1007. PMF Hydraulics CalculatiOn develops the HEC-RAS                       caiculatton is m an unapproved geometry for rout1ng the output from the               state pending recerpt of the HfC-HMS model to deterrmne the water                   nputs from the site specific level at the site. calculation assumes                 PMP.
180999.51.1007. PMF Hydraulics CalculatiOn develops the HEC-RAS caiculatton is m an unapproved geometry for rout1ng the output from the state pending recerpt of the HfC-HMS model to deterrmne the water nputs from the site specific level at the site. calculation assumes PMP.
failure of all upstream dams texcept rncon.sequential dams). HypothetiCal                   The results from this calculation dams were conservat rvelv used to                       are very* conservatrve and not 8/29/2014 represent cluster of dams per                           conside-red to be reahstK. Thus, JLO-tSG-2013.01.                                       the Intention was to refine these values us1ng the site specific PMP .additional calibrations and more detailed informiiltton regiilrdinc the dam failures calculation condition on Tarcet c ...culation Purpose of calcu'-ion     Tarcet Date Date
failure of all upstream dams texcept rncon.sequential dams). HypothetiCal The results from this calculation dams were conservat rvelv used to 8/29/2014 are very* conservatrve and not represent cluster of dams per conside-red to be reahstK. Thus, JLO-tSG-2013.01.
the Intention was to refine these values us1ng the site specific PMP.additional calibrations and more detailed informiiltton regiilrdinc the dam failures c... culation Purpose of calcu'-ion Tarcet Date calculation condition on Tarcet Date
:t t5 not dear that this calculatiOn 111 its current state would be of any use for the USACE analysts.
:t t5 not dear that this calculatiOn 111 its current state would be of any use for the USACE analysts.
The HEC*RAS model geometr~,
The HEC*RAS model geometr~,
howeller. could be useful for the USACE Prairie Island Probable Maximum Flood Related Calculations c.tkulation COndition on Tctrcet Calculation                 Purpose of c.tlcul.ltion       TctrgetOctte Date Site Speclftc PMP             calculation determines srte speclftc ctli-season PMP It also determmes the snow-season PMP and provides a             8/29/2014                       Draft meteorological ttme sel'le's 1dew pomt temperature and w*nds speoedj used to deftne snowmelt condrtions durinc the snow-season PMP. These v*alues are used as an rnput to determin-e ttH! PM F for the watershed.                         9/12/2014                   Appro..*ed Storm Events Meteorologtea!   Hrstorical meteorologiCal data has been     9/5/2014                       Draft Data                         compiled for the April 1965 and Apnl 2001 events. Data tncfudes prec~pitat10n.
howeller. could be useful for the USACE Prairie Island Probable Maximum Flood Related Calculations Calculation Purpose of c.tlcul.ltion TctrgetOctte c.tkulation COndition on Tctrcet Date Site Speclftc PMP calculation determines srte speclftc ctli-season PMP It also determmes the snow-season PMP and provides a 8/29/2014 Draft meteorological ttme sel'le's 1 dew pomt temperature and w*nds speoedj used to deftne snowmelt condrtions durinc the snow-season PMP. These v*alues are used as an rnput to determin-e ttH! PM F for the watershed.
dew pomt temperature and snow pack data. Also, snow water equiValent ts 9/19/2014                   Approved calculated from snow pack data and other meteorological data. These data are used as tnputs to calibrate the HfC-HMS model.
9/12/2014 Appro.. *ed Storm Events Meteorologtea!
180999.51.1003. PMF Hydrology ThtS calculat)()n h.as two mam                             calculcttlon is m ctn unapproved components                                                 state pending the fo!lowtng
Hrstorical meteorologiCal data has been 9/5/2014 Draft Data compiled for the April 1965 and Apnl 2001 events. Data tncfudes prec~pitat10n.
dew pomt temperature and snow pack data. Also, snow water equiValent ts 9/19/2014 Approved calculated from snow pack data and other meteorological data. These data are used as tnputs to calibrate the HfC-HMS model.
180999.51.1003. PMF Hydrology ThtS calculat)()n h.as two mam calculcttlon is m ctn unapproved components state pending the fo!lowtng
* HEC-HMS model calibratiOn calculation uses tustorical
* HEC-HMS model calibratiOn calculation uses tustorical
* Refinement of calibratiOn prectprtat10n, snow water                           Parameters C-alibration has 8/29/2014 content and streamgage data to                      been completed using limited Ultbrate the HEC-HMS model                           meteorologiCal data that results 10 a conservatiVe
* Refinement of calibratiOn prectprtat10n, snow water Parameters C-alibration has content and streamgage data to 8/29/2014 been completed using limited Ultbrate the HEC-HMS model meteorologiCal data that results 10 a conservatiVe
* PMF hvdrographs The calibrated                       approxtmation of calibrated model IS then used to calculate                     parameters. AddftJonal       :
* PMF hvdrographs The calibrated approxtmation of calibrated model IS then used to calculate parameters. AddftJonal  
Enclosure 4


cakulation COndition on Target Calculation Purpose of calculation         Tarcet Date Date runoff due to prec1prtation and                   meteorologiCal data has be+n snowmelt and routes the runoff                   comptled th.at would allow to potnts upstream of the srte                   further refinement of the usmg the calibrated HEC-HMS                       calibratron model.
Calculation Purpose of calculation Tarcet Date cakulation COndition on Target Date runoff due to prec1prtation and meteorologiCal data has be+n snowmelt and routes the runoff comptled th.at would allow to potnts upstream of the srte further refinement of the usmg the calibrated HEC-HMS calibratron model.
* Development of the new srte spectftc preopitation and snowmelt unapproved cakulation tnputs are based on PMP values from HMR-51/Sl/53. ThiS cakulation would be updated with rnputs based on srte specific PMP values.
* Development of the new srte spectftc preopitation and snowmelt unapproved cakulation tnputs are based on PMP values from HMR-51/Sl/53. ThiS cakulation would be updated with rnputs based on srte specific PMP values.  
                                                        !'t ts not dear that this calcul~tron
!'t ts not dear that this calcul~tron  
                                                        .nits current state would be of any use for the USACE analysts.
.nits current state would be of any use for the USACE analysts.
It would be expected that the USACf would perform caltbratiOru/vahdations of the*r routtng models calculation CMidition on Target Calculation                       Purpose of Qlcul*ion               Target ~te D<lte 180999-51.1006, PINGP Probable Cil<uiatiOn determined precipitation and Maxmum Precipttauon and       snowmelt for determtning rui'H)ff for the Snowmelt                       .,,,.atershed. As part of the tuerarch&Cal approach. the ca lculat10n was conservatuel*( performed us*ng PMP                       calculation is m an unappro ..*ed
It would be expected that the USACf would perform caltbratiOru/vahdations of the*r routtng models Calculation Purpose of Qlcul*ion Target ~te calculation CMidition on Target D<lte 180999-51.1006, PINGP Probable Cil<uiatiOn determined precipitation and Maxmum Precipttauon and snowmelt for determtning rui'H)ff for the Snowmelt  
                              **alues based on HMR-51/52/53 and u~s state pending recetpt of the
.,,,.atershed. As part of the tuerarch&Cal approach. the ca lculat10n was conservatuel*( performed us*ng PMP calculation is m an unappro.. *ed  
                              *.-ery conservative ilppro:umatJOns to nputs values from the site extend the PMP beyond the 20,000 specific PMP and further square mfie !rnit of the HMR gui~lines                   refinements of ram and i1us calculatiOn also uses con~rvatJVe         S/29!2014 snowmelt calculatiOns.
**alues based on HMR-51/52/53 and u~s state pending recetpt of the  
*.-ery conservative ilppro:umatJOns to nputs values from the site extend the PMP beyond the 20,000 specific PMP and further square mfie !rnit of the HMR gui~lines refinements of ram and i1us calculatiOn also uses con~rvatJVe S/29!2014 snowmelt calculatiOns.
parameters for estmatmg snowmelt.
parameters for estmatmg snowmelt.
The consernttve approx.rmat10ns used m                   It rs not dear that this calculation this calculation are tntended to be                       1n its current state would be of superseded by the site specrfic PMP any use for the USACE analys1s.
The consernttve approx.rmat10ns used m It rs not dear that this calculation this calculation are tntended to be 1n its current state would be of superseded by the site specrfic PMP any use for the USACE analys1s.
nput, and corresponding rneteorologJCai condttions tdew po*nt temperatures and w1nd spHds) that are conSistent wrth the site specific PMP.
nput, and corresponding rneteorologJCai condttions tdew po*nt temperatures and w1nd spHds) that are conSistent wrth the site specific PMP.
180999.51.1007, PMF Hydraulics CalculatiOn develops the HEC*RA5                         Cikulat1on is m an unapproved geometry for roUting the output from the                 st;ate pending recetpt of the H&#xa3;C-HM.S model to deter!TIIne the water                   nputs from the site specific t<tVel it the site. calculation assumes                   PMP.
180999.51.1007, PMF Hydraulics CalculatiOn develops the HEC*RA5 Cikulat1on is m an unapproved geometry for roUting the output from the st;ate pending recetpt of the H&#xa3;C-HM.S model to deter!TIIne the water nputs from the site specific t<tVel it the site. calculation assumes PMP.
failure of all upstre;am d;ams (except ncons.equential dims I. HypothetiCal                     The results from this calculation dams v.>ere conservatrvelv used to             8/29/2014 are very conservative and not represent cluster of dams per                           considered to be realistiC. rhus.
failure of all upstre;am d;ams (except ncons.equential dims I. HypothetiCal The results from this calculation dams v.>ere conservatrvelv used to 8/29/2014 are very conservative and not represent cluster of dams per considered to be realistiC. rhus.
Ji.D*ISG*lOH-Ql                                           the ntention was to refine these values usmg the site specific PMP, addttional calibration and more detatled informatiOn regarding the dam failures cak\Ation condition on Target C.alc\Ation Purpose of ~lcul41tion     Target Date Date It IS not cl~ar that this caiculatiOn lfl iu current state would be of any use for the USACE anal~ts.
Ji.D*ISG*lOH-Ql the ntention was to refine these values usmg the site specific PMP, addttional calibration and more detatled informatiOn regarding the dam failures C.alc\\Ation Purpose of ~lcul41tion Target Date cak\\Ation condition on Target Date It IS not cl~ar that this caiculatiOn lfl iu current state would be of any use for the USACE anal~ts.
Location of Hydrographs for Monticello Nuclear Generating Plant (MGNP) and Prairie Island Nuclear Generating Plant (PINGP)
Location of Hydrographs for Monticello Nuclear Generating Plant (MGNP) and Prairie Island Nuclear Generating Plant (PINGP)
Monticello Nuclear Generating Plant Please provide the following:
Monticello Nuclear Generating Plant Please provide the following:
: 1. Flow and stage hydrographs at three (3) locations:
: 1.
Flow and stage hydrographs at three (3) locations:
At river mile 902.7, At river mile 900.6 (plant site), and At river mile 899.3.
At river mile 902.7, At river mile 900.6 (plant site), and At river mile 899.3.
: 2. Maximum flow velocities (main channel and left and right overbanks) at four (4) HEC-RAS cross sections near the plant site (plant site=river mile 900.6):
: 2.
Maximum flow velocities (main channel and left and right overbanks) at four (4) HEC-RAS cross sections near the plant site (plant site=river mile 900.6):
At the two (2) cross sections immediately upstream of the plant site At the cross section at the plant site At the cross section immediately downstream of the plant site The exact locations of the USACE HEC-RAS model cross-sections are not known at this time. It is presumed, however, that these four (4) HEC-RAS cross sections will be within river miles 902.7 and 899. 3.
At the two (2) cross sections immediately upstream of the plant site At the cross section at the plant site At the cross section immediately downstream of the plant site The exact locations of the USACE HEC-RAS model cross-sections are not known at this time. It is presumed, however, that these four (4) HEC-RAS cross sections will be within river miles 902.7 and 899. 3.
: 3. Information needed to calculate wind fetch lengths and average water depth between river miles 902.7 and 894.4 Location (GIS shapefile or equivalent) of all cross sections between river miles 902.7 and 894.4.
: 3.
Information needed to calculate wind fetch lengths and average water depth between river miles 902.7 and 894.4 Location (GIS shapefile or equivalent) of all cross sections between river miles 902.7 and 894.4.
Maximum water surface elevations at each cross section between river miles 902.7 and 894.4.
Maximum water surface elevations at each cross section between river miles 902.7 and 894.4.
Average water depth or top width and flow area, during maximum water surface elevation, at each cross section between river miles 902.7 and 894.4.
Average water depth or top width and flow area, during maximum water surface elevation, at each cross section between river miles 902.7 and 894.4.
No hydrographs are needed nor requested for these cross sections.
No hydrographs are needed nor requested for these cross sections.
The data requested can be generated automatically within HEC-RAS from standard output tables.
The data requested can be generated automatically within HEC-RAS from standard output tables.  
Enclosure 5


Prairie Island Nuclear Generating Plant Please provide the following:
Prairie Island Nuclear Generating Plant Please provide the following:
: 1. Flow and stage hydrogr a phs at three ( 3) locations:
: 1.
Flow and stage hydrogr a phs at three ( 3) locations:
At river mile 803, At river mile 798 (plant site), and At river mile 797.5.
At river mile 803, At river mile 798 (plant site), and At river mile 797.5.
: 2. Maximum flow velocities (main channel and left and right overbanks) at four (4) HEC-RAS cross sections near the plant site (plant site=river mile 798):
: 2.
Maximum flow velocities (main channel and left and right overbanks) at four (4) HEC-RAS cross sections near the plant site (plant site=river mile 798):
At the two (2) cross sections immediately upstream of the plant site At the cross section at the plant site At the cross section immediately downstream of the plant site The exact locations of the USACE HEC-RAS model cross-sections are not known at this time. It is presumed, however, that these four HEC-RAS cross sections will be within river miles 803 and 797.5.
At the two (2) cross sections immediately upstream of the plant site At the cross section at the plant site At the cross section immediately downstream of the plant site The exact locations of the USACE HEC-RAS model cross-sections are not known at this time. It is presumed, however, that these four HEC-RAS cross sections will be within river miles 803 and 797.5.
: 3. Information needed to calculate wind fetch lengths and average water depth between river mile 814 and 784.5 Location (GIS shapefile or equivalent) of all cross sections between river miles 814 and 784.5.
: 3.
Information needed to calculate wind fetch lengths and average water depth between river mile 814 and 784.5 Location (GIS shapefile or equivalent) of all cross sections between river miles 814 and 784.5.
Maximum water surface elevations at each cross section between river miles 814 and 784.5.
Maximum water surface elevations at each cross section between river miles 814 and 784.5.
Average water depth (or top width and flow area) at each cross section between river miles 814 and 784.5.
Average water depth (or top width and flow area) at each cross section between river miles 814 and 784.5.
No hydrographs are needed nor requested for these cross sections.
No hydrographs are needed nor requested for these cross sections.
The data requested can be generated automatically within HEC-RAS from standard output tables.
The data requested can be generated automatically within HEC-RAS from standard output tables.  
                'RM90S
'RM90S  
              *                                                                                                                                                                                       ~ :,
.. RM 9CM RM 902.7 +I*
                              .. RM 9CM w*~ .,   .
Cross section located approximately
RM 902.7 +I*
/
2.1 Miles upstream of MNGP RM 899.3 +1-I
~ :,
w*~
/
. Cross section located approx,mately 1.3 Miles downstream of MNGP 1 H~d"<'!;'-'Ph'.. n** "f'qdf"",ted ~~
rt ]DC1hDn 1 ' \\if' r f"!"~:lr* 90:2 to locavm ~: "'"JV nvle 900 6 plant ''I<'J, :md
](Jfc7jf:0n 3 '",VP" PI :If* f:.99 3}
2_
\\1riX fYhlnl >-:vP'' V('kl(if:('rl ii'"f*,.('(jlJtH,ft->d ?it
: a. 1\\.oyo co*,s st*(t*r11Y~ rnrnr-dl::ttf*lv* tqY~t"f*arv-~ c/ thr*
plant :betvv~":<f'n IOClif,nn~;, 1
,..;vc~ rnd*** 90~ 71 rtnd 2
'"*vr-~
m:lf* ~JOO.bj}
b Tht~ c--o-:.') 'lf'tt*on ne,r tht*lnc1t1on 2. ;ptanl ~,*te:
:-.*.;p* tr,,)p 900 6,
(.The cro<.,<:l Sf'*( tton :mrnf'd'?lft:..lv dovvnr~t,.(~arn o+ th(*
pl.1n1 ;lJr*lv.*f~f*n Jr'.tr_,~t.on 2 vf'~tl"'l:!f* ~-10\\)6! r~nd?,,..
._,p~
milf* gry~~ 31:
~'V.~tf:.... df"pth nt<Yrn~tron :r~cY,<:>.;,t*(l*c,n lfJCil:r*r,, rnax
'0.*;:ttr-" ",.J~'"iilf'.:'!("J,1t!On,,iru:J *'iVt'~arzf' v\\*at~"~* df*pth.j i1,..r~
:Cf*q,Jr~o:,t,:*d.:11 all c~n*,(, 'if'({J'!n') L*t*twf*,**n lr.cat on'> 1; *Vf'"
n1<1r* 90.:: f! rtnd *#;,..tvt** rn,le B9t.
LJSACE:: l'<iver MiiP.~
RM89~
.. RM 894.4+1-Cross section located approximately 6.0 Miles downstream of MNGP 7  
~
- *s\\,UJ~Hl H)d.
~--"-....
~-*
llltl.( j
~
Rl.t895.
\\\\!-< 1 {;i.I'T en
~"'--
_"'.... ~--h*
~
4
~'
2 3
-~~~--~~~~~iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiil Miles
 
RM 814 +I*
RMII1i
:cross section located approximately
,fM 816
/-16
__ Miles upstream of PINGP.
sv ****-_.8-'!'f812 RMS 13 eRM811 eRM~r**
elrH RM810
/***-...,
' 1 RM809 RM808 RM807 wr s
RM 803 +I*
RM 806
./
Cross section located approximately
Cross section located approximately
                                                                    /        2.1 Miles upstream of MNGP I
: 5 Miles upstream of PINGP RM805  
RM 899.3 +1-
*RM 804.
                                                                                                                  . Cross section located approx,mately 1.3 Miles downstream of MNGP
RM 798.0 +I*
                                                                                                            /
Cross section located at PINGP'
RM 894.4+1-Cross section located approximately 6.0 Miles downstream of MNGP 1 H~d"<'!;'-'Ph'..n** "f'qdf"",ted ~~
: 1. H*1d 'O!::'"PIY. ;n* *r:qcJe;tr*d at.  
7..
~ lorat*on 2 :~.,u*d rnik*bQJj b IP(f1t*nn vr*~ n1 k*
RM89~
plant <:,.t*':. ;md
rt ]DC1hDn 1 ' \if' f"!"~:lr* 90:2 r
( !nf71t/)n.; ;~;'.If*~ fl'l:h::* !~}! ~~  
to locavm ~: "'"JV nvle 900 6 plant                            ''I<'J, :md
\\1,'1)1 fYI~Im ~.\\/t',.. V(*iOCit,f''~,yf> *t*QUt*\\tf"d.1t
      ](Jfc7jf:0n    3 '",VP"      PI :If* f:.99 3}
:-1 fv;Z"* r~n<.'> *,**01nns ;mrnerlateb,: upst~r-arn ot fht'*
2_ \1riX fYhlnl >-:vP''        V('kl(if:('rl    ii'"f* ,.('(jlJtH,ft->d ?it
plant :l*~*h\\'t'!'f) loc?tt,nn'. 2 v,'<Jf'... lll'lf' 8031.1'nd 3 u;v(*' n1d+"* l~Rl!
                                                                                                                                                                  ~
0 TtW c**t,(,\\ '.f*ct on nf*ir lhf.. j(,Ci1tl0n 3 iPii1tlf {,ilf*i  
                                                                                                                                                                          - *s\,UJ~Hl
;**vr*... PI :If*
: a. 1\.oyo co*,s st*(t*r11Y~ rnrnr-dl::ttf*lv* tqY~t"f*arv-~ c/ thr*
r Th!''  
plant :betvv~":<f'n IOClif,nn~;, 1 ,..;vc~ rnd*** 90~ 71 rtnd 2 '"*vr-~                                                                                                                          H)d.
*~r*ch!n 'mmt*thr~h.*ly dc*,... n;:,t~f*arn thf' pl<tnl {bt*tv:*~*f*n !0(.1t*0n  
m:lf* ~JOO.bj}
":'Jt'' m:lf l9&1.:md mdf* 191 ~11 3 *~vMe_,_ rif'Pth :n 1o'm;H nn ;en*;*. <..t>rt*nn !f)CFit on  
b Tht~ c--o-:.') 'lf'tt*on ne,r tht*lnc1t1on 2. ;ptanl
/11.1<o V;~h':<~ ',~J.;-
:-.*.;p* tr,,)p    900 6,
1,1U* f'!("J.11*flr)  
                                                                              ~,*te:
~nd.1';f*'.1gf' 'v".?ltf*'"
                                                                                                                                                      ~--"-.... ~
dt*plhi a*r* **,,qdt*'=lt*d at.111  
Rl.t895.
\\P>rt*nn~) b***t '.t:een lnr~t,fJn<:. 1 ****F*r rn:k* 0111) and:-..
                                                                                                                                                        ~"'--
r;'l*it*  
                                                                                                                                                                              ~-*
).!
                                                                                                                                                                                      \\!-< 1{;i.I'T
IJSACE RI'Jf!! \\lilrc.
_"'....~--h* ~
RP.terPnCB Lcc;;:1cru:,
                                                                                                                                                                                                        -en llltl.( j
/
(.The cro<.,<:l Sf'*( tton :mrnf'd'?lft:..lv dovvnr~t,.(~arn o+ th(*                                                                                          ".
803
pl.1n1 ;lJr*lv.*f~f*n Jr'.tr_,~t.on 2 vf'~tl"'l:!f* ~-10\)6! r~nd?, ,. ._,p~
*RM 801,
milf* gry~~ 31:                                                                                                                                                            4
*RM801 1ritioo 12 PINGP
    ~'V.~tf:.... df"pth nt<Yrn~tron :r~cY,<:> .;,t*(l*c,n lfJCil:r*r,, rnax
: *~ i
'0.*;:ttr-" ",.J~'"iilf' .:'!("J,1t!On, ,iru:J *'iVt'~arzf' v\*at~"~* df*pth.j i1,..r~
,_ I '
:Cf*q,Jr~o:,t,:*d .:11 all c~n*,(, 'if'({J'!n') L*t*twf*,**n lr.cat on'> 1;          *Vf'"
RM 797.5 +I*
n1<1r* 90.:: f! rtnd *#; ,..tvt** rn,le B9t.
~
* LJSACE:: l'<iver          MiiP.~
Cros~ section located approximately:
                                                                                                                                                  ~'                                2                    3
~-
                                                                                                                                          -~~~--~~~~~iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiil Miles RMII1i
; 0.5 Mtle downstream of PINGP RM 784.5 +I*
                ,fM 816 RM 814 +I*
-~*\\.*
:cross section located approximately
.f:':r3 f
                                      / - 1 6__Miles upstream of PINGP.                                                                                                                                                wr s eRM~r**
.!. 7.92 RM 791) 789 e"'"'"\\  
sv              elrH
.Rf/4 eRM 1W!
                                            ****-_.8-'!'f812
RM 5
                      /***-...,
~.~-..."--..
                      ' 1 RMS 13            eRM811
:-:-:-- RM 7tJ7 RM 784
                                                                . RM810 RM809 RM808
.-t;,;t RM 783
                                                                                          ..RM807 RM 806 RM 803 +I*
. -~
                                                                                                                  . / Cross section located approximately
*~*-*f': \\
: 5 Miles upstream of PINGP RM805           '
FIM'
* 804
\\ 5 J
                                                                                                            *RM    .                        RM 798.0 +I*
'~ '\\\\......
Cross section 803                      located at PINGP' I
1 2'*
                                                                                                                    *RM 801,        ..
2S  
                                                                                                                          *RM801                            RM 797.5 +I*                                      ,
~~--~~~~-iiiiiiiiiiiiiiiiiiiiiiiiiMiles
                                                                                                                                                  ~ Cros~ section located approximately:
: 1. H*1d 'O!::'"PIY. ;n* *r:qcJe;tr*d at.                                                     ,-                                  1ritioo  ~-          ; 0.5 Mtle downstream of PINGP                        *
    ~ lorat*on 2 :~.,u*d rnik*bQJj 12/                        '
* b IP(f1t*nn                 vr*~ n1 k*             plant <:,.t*':. ;md                                                                                                             RM 784.5 +I*
(   !nf71t/)n .;       ;~;'.If*~ fl'l:h::* !~}! ~~
;:_    \1,'1)1 fYI~Im ~.\/t',.. V(*iOCit ,f''~ ,yf> *t*QUt*\tf"d .1t
                                                                                                                                                                                                                -~*\.*
:-1   fv;Z"* r~n<.'> *,**01nns ;mrnerlateb,: upst~r-arn ot fht'*
PINGP f
plant :l*~*h\'t'!'f) loc?tt,nn'. 2 v,'<Jf' ... lll'lf' 8031 .1'nd 3 u;v(*'     n1d+"* l~Rl!                                                                                                                                                                                           -*
0     TtW c**t,(,\ '.f*ct       on nf*ir lhf.. j(,Ci1tl0n 3 iPii1tlf         {,ilf*i          : *~ i
;**vr* . . PI :If*
r Th!''                 *~r*ch!n 'mmt*thr~h.*ly dc*,. . n;:,t~f*arn               thf'                                                           .f:':r3
                                                                                                                                                          .!. 7.92 RM 791)              789 pl<tnl {bt*tv:*~*f*n !0(.1t*0n                     ":'Jt'' m:lf l9&1 .:md
                                                                                                                                                                                  .Rf/4 eRM 1W!
                                                                                                                                                      -------*~.~-..."--..
e"'"'"\        .*                                  RM        5 mdf* 191           ~11
:-:-:-- RM 7tJ7
* RM 784
                                                                                                                                                                .-t;,;t
                                                                                                                                                            -~                                      *~*-*f':
3     *~vMe_,_   rif'Pth :n 1 o'm;H nn ;en*;*. <..t>rt*nn !f)CFit on                                                                           "'                          '            '"""                            RM 783 1
/11.1<o V;~h':<~ ',~J.;- ,1U* f'!("J.11*flr)           ~nd .1';f*'.1gf' 'v".?ltf*'"
dt*plhi a*r* **,,qdt*'=lt*d at .111                         \P>rt*nn~) b***t '.t:een
                                                                                                                                                          .                                                      \            FIM' lnr~t,fJn<:. 1 ****F*r rn:k* 0111) and:-..                           r;'l*it*       ).!
                                                                                                                                                                                                          \ 5     J
                                                                                                                                                                                                            '~ '\\ ......
* IJSACE RI'Jf!! \lilrc .
1 2'*       2S
        -              RP.terPnCB Lcc;;:1cru:,
                                                                                                                                                              ~~--~~~~-iiiiiiiiiiiiiiiiiiiiiiiiiMiles
* The NRC took an action to determine whether or not if in addition to providing the hydrographs associated with PMF study, which it believes is relevant to Prairie Island, if USACE would be willing to provide the details, including assumptions, associated with this PMF study. Xcel indicated that having the USACE PMF study as soon as possible, if available, would be helpful in its efforts of developing its own basin-wide PMF for Prairie Island which it intends to base on a site-specific probable maximum precipitation model.
* The NRC took an action to determine whether or not if in addition to providing the hydrographs associated with PMF study, which it believes is relevant to Prairie Island, if USACE would be willing to provide the details, including assumptions, associated with this PMF study. Xcel indicated that having the USACE PMF study as soon as possible, if available, would be helpful in its efforts of developing its own basin-wide PMF for Prairie Island which it intends to base on a site-specific probable maximum precipitation model.
The USACE was provided an opportunity to comment on this summary prior to its issuance and their comments were addressed in the final version of this summary.
The USACE was provided an opportunity to comment on this summary prior to its issuance and their comments were addressed in the final version of this summary.
Please direct any inquiries me at 301-415-1032 or at Joseph.Sebrosky@nrc.gov.
Please direct any inquiries me at 301-415-1032 or at Joseph.Sebrosky@nrc.gov.  
                                                /RAJ Joseph M. Sebrosky, Senior Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos. 50-263, 50-282, and 50-306
/RAJ Joseph M. Sebrosky, Senior Project Manager Hazards Management Branch Docket Nos. 50-263, 50-282, and 50-306  


==Enclosures:==
==Enclosures:==
: 1. Agenda
: 1. Agenda
: 2. Xcel Questions and Answers
: 2. Xcel Questions and Answers Japan Lessons-Learned Division Office of Nuclear Reactor Regulation
: 3. Monticello Related Probable Maximum Flood Calculations
: 3. Monticello Related Probable Maximum Flood Calculations
: 4. Prairie Island Probable Maximum Flood Calculations
: 4. Prairie Island Probable Maximum Flood Calculations
: 5. Location of Hydrographs for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant (PINGP) cc w/encls: Distribution via ListServ DISTRIBUTION:
: 5. Location of Hydrographs for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant (PINGP) cc w/encls: Distribution via ListServ DISTRIBUTION:
PUBLIC                         KSee, NRO               RidsNrrLASLent JLD R/F                        CCook, NRO               JSebrosky, NRR RidsNrrPMMonticello Resource    BHarvey, NRO RidsNrrDoriLpl3-1              RKuntz,NRO RidsNrrPMPrairielsland Resource RidsRgn3MaiiCenter Resource ADAMS A ccess1on NOS.: Meef mg Not1ce . ML14205A524 Meetmg s ummary ML1422 OA283 *via email OFFICE       NRR/JLD/JHMB/PM             NRR/JLD/JHMB/LA               NRO/DSEAIRHM1 /BC*
PUBLIC JLD R/F RidsNrrPMMonticello Resource RidsNrrDoriLpl3-1 RidsNrrPMPrairielsland Resource KSee, NRO RidsNrrLASLent CCook, NRO JSebrosky, NRR BHarvey, NRO RKuntz,NRO RidsRgn3MaiiCenter Resource ADAMS A ccess1on N OS.: M f
NAME         JSebrosky                   Slent                       CCook DATE         09/04/14                     08/08/14                     09/04/14 OFFICE       NRR/JLD/JHMB/BC             NRR/JLD/JHMB/PM NAME         SWhaley                     JSebrosky DATE         09/08/14                     09/08/14 OFFICIAL RECORD COPY}}
N.
ML14205A524 M ee mg ot1ce eetmg s ummary ML 14 22 OA28 3 OFFICE NRR/JLD/JHMB/PM NRR/JLD/JHMB/LA NRO/DSEAIRHM1 /BC*
NAME JSebrosky Slent CCook DATE 09/04/14 08/08/14 09/04/14 OFFICE NRR/JLD/JHMB/BC NRR/JLD/JHMB/PM NAME SWhaley JSebrosky DATE 09/08/14 09/08/14 OFFICIAL RECORD COPY  
*via email}}

Latest revision as of 17:29, 10 January 2025

Summary of August 5, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, NRC, and Northern States Power Company - Minnesota to Discuss Flooding Analysis Associated with Monticello and Prairie Island Nuclear Gen
ML14220A283
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 09/08/2014
From: Joseph Sebrosky
Japan Lessons-Learned Division
To:
Office of Nuclear Reactor Regulation
Sebrosky J, NRR/JLD, 415-1132
References
TAC MF3696, TAC MF3698
Download: ML14220A283 (21)


Text

LICENSEE:

FACILITY:

SUBJECT:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 8, 2014 Northern States Power Company - Minnesota Monticello Nuclear Generating Plant Prairie Island Nuclear Generating Plant, Units 1 and 2

SUMMARY

OF AUGUST 5, 2014, CLOSED MEETING BElWEEN REPRESENTATIVES OF THE U.S. ARMY CORPS OF ENGINEERS, U.S.

NUCLEAR REGULATORY COMMISSION, AND NORTHERN STATES POWER COMPANY-MINNESOTA TO DISCUSS FLOODING ANALYSIS ASSOCIATED WITH MONTICELLO NUCLEAR GENERATING PLANT AND PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 (TAC NOS. MF3696, MF3697 AND MF3698)

On August 5, 2014, the U.S. Nuclear Regulatory Commission (NRC) staff held a closed meeting with the U.S. Army Corps of Engineers (USAGE), and Northern States Power Company-Minnesota, doing business as Xcel Energy (Xcel), to discuss the flooding hazard reevaluation (FHR) for the Monticello Nuclear Generating Plant (MNGP) and Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. The meeting was held at USAGE's offices in Saint Paul, Minnesota. The closed meeting notice dated July 24, 2014, can be found in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML14205A524. The agenda for the August 5, 2014, meeting, including the list of attendees, can be found in Enclosure 1. Prior to the meeting Xcel provided a list of questions associated with the USAGE FHR for the MNGP and PINGP sites. These questions were discussed during the meeting. The questions and their answers can be found in Enclosure 2.

The purpose of the meeting was to discuss the portion of the FHR the USAGE is performing under contract to the NRC for MNGP and PINGP, Units 1 and 2. By letters dated March 5, 2014, Xcel requested NRC assistance in having the USAGE perform a dam failure analysis for the Mississippi watershed for MNGP and PINGP, Units 1 and 2 (ADAMS Accession Nos.

ML14065A112 and ML14064A291, respectively). Xcel requested the NRC's assistance to support Xcel's development of a MNGP and PINGP, Units 1 and 2 flooding hazard reevaluation report (FHRR) in response to the March 12, 2012, request for information issued pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) (ADAMS Accession No. ML12073A348).

Meeting Highlights The USAGE described the results of the screening process it performed on the dams upstream of the MGNP and PINGP sites. Consistent with guidance outlined in Japan Lessons-Learned Project Directorate (JLD) Interim Staff Guidance (ISG) JLD-ISG-2013-01, "Guidance for Assessment of Flooding Hazards Due to Dam Failure," (ADAMS Accession No. ML13151A153) the USAGE performed an analysis of the 180 dams upstream of Monticello, and 618 dams upstream of Prairie Island, and determined that there are no "potentially critical" dams that warrant a more detailed dam breach analysis. Although no dams have been identified as "potentially critical" dams, in accordance with the JLD-ISG-2013-01, USAGE will be providing the NRC with a recommendation regarding modeling of a basin-wide probable maximum flood (PMF).

Regarding the PINGP basin-wide PMF, USAGE indicated that a PMF was developed in 1985 for a dam and lock that is immediately downstream of the PINGP site. USAGE considers this PMF to be relevant to PINGP and it is likely that a USAGE detailed model for the PINGP basin-wide PMF will not be needed.

Regarding the Monticello basin-wide PMF, USAGE indicated that there is no modern basin-wide PMF that is available for this site and that USAGE will most likely recommend to the NRC that a basin-wide PMF be developed. If the USAGE does develop a basin-wide PMF analysis for Monticello it will be developed in accordance with current guidance and the USAGE will also use its knowledge of the river basin and characteristics of the dams in the basin to develop the Monticello basin-wide PMF analysis.

The following action items resulted from the meeting:

To aid in the USAGE's development of a PMF model for Monticello, Xcel will provide a list of the calculations and models that they are developing with target dates for when this information will be available. The NRC will review the list and then inform Xcel of the calculations and models that would be helpful to aid in the development of the USAGE's Monticello PMF model. Subsequent to the meeting Xcel provided the list of Monticello PMF calculations. This list can be found in Enclosure 3.

Xcel will provide a list of the calculations being developed for Prairie Island and the NRC may request these calculations to assess what, if any, differences there are between the basin-wide PMF for Prairie Island that USAGE believes is relevant and Xcel's calculations. Subsequent to the meeting Xcel provided the list of Prairie Island PMF calculations. This list can be found in Enclosure 4.

Xcel will provide a list of locations for hydrographs that Xcel would like to have for the USACE basin-wide PMF analysis. Subsequent to the meeting Xcel identified the hydrograph locations. The locations can be found in Enclosure 5.

Xcel will determine whether it would like to have PMF levels for secondary events. There was a discussion that the Monticello basin-wide PMF will most likely be based on a rain on snow event. Xcel indicated that although a summer PMF may lead to lower levels at the site, the flood may arrive at the site sooner than the rain on snow event and there could be some benefit in gaining insights from such a secondary event.

Subsequent to the meeting Xcel informed the NRC staff that it would not request USAGE to perform evaluations of any secondary flood events.

The NRC took an action to determine whether or not if in addition to providing the hydrographs associated with PMF study, which it believes is relevant to Prairie Island, if USAGE would be willing to provide the details, including assumptions, associated with this PMF study. Xcel indicated that having the USAGE PMF study as soon as possible, if available, would be helpful in its efforts of developing its own basin-wide PMF for Prairie Island which it intends to base on a site-specific probable maximum precipitation model.

The USAGE was provided an opportunity to comment on this summary prior to its issuance and their comments were addressed in the final version of this summary.

Docket Nos. 50-263, 50-282, and 50-306

Enclosures:

1. Agenda
2. Xcel Questions and Answers
3. Monticello Related Probable Maximum Flood Calculations
4. Prairie Island Probable Maximum Flood Calculations
5. Location of Hydrographs for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant (PINGP) cc w/encls: Distribution via ListServ

US Army Corps of Engineers NRC/USACE Scoping Meeting Monticello and Prairie Island NPPs Aug 5, 2014

('\\~U.S.NRC USACE St. Paul District Office Executive Conference Room, 7th Floor 180 5th St E Protecting People tUld the F111 1ironment St Paul, MN 55101 Attendees:

NRC:

Andy Campbell, Ken See, Brad Harvey, Joe Sebrosky USACE Omaha:

Roger Kay, Teresa Reinig, Chris Passero USACE St. Paul:

Doug Crum, Corby Lewis, Bonnie Greenleaf, Jim Ulrick Xcel Energy:

Marty Murphy, Brian Zelenak, Richard Rohrer, Bill Partridge, Steve Kaas Black & Veatch:

Pablo Gonzalez-Quesada, Frank Means


Agenda Topics -----

TUESDAY MORNING AUGUST 5 Licensee Meeting Arrival for Security Screening NRC/FERC/Xcel 08:45-09:00

Introductions

ALL 09:00- 09:15

  • Hydrologic and Hydraulic Modeling Methods and USACE 09:45-10:15 Results
  • Licensee's questions and answers (see next page)

Xcel/NRC/USACE 10:15-11:00 BREAK 11 :00 - 11:30 Continued discussions as necessary Xcel/NRCIUSACE 11:30- 12:00

Xcel Questions Associated With U.S. Army Corps of Engineers Flooding Hazard Reevaluation

1.

For each dam listed in the March 05, 2014 letters [Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML14065A112 and ML14064A291],

please provide the inflow and outflow hydrographs at the location of the dam under the following scenarios: all season probable maximum flood (PMF), snow season PMF, spillway design flood (SDF), 500-yr flood, 25-year flood, and "sunny day" breach. (500-yr and 25-yr-only required if seismic failure is found to be credible)

USACE I NRC Answer: The U.S. Army Corps of Engineers (USACE) has performed a preliminary screening review using the Interim Staff Guidance (ISG) to identify non-critical dams. The results show that all dams upstream of both Nuclear Power Plant (NPP) sites are potentially screened out.

For the basin-wide PMPIPMF, the USACE will determine if any credible dam failure scenarios would impact the PMF elevation. The USACE will route the resulting hydrographs using their hydrologic I hydraulic models.

Each licensee will be given in electronic form hydrographs (stage, flow and velocity) at each NPP site. The licensees may request additional hydrographs (stage, flow &

velocity) at other locations between the federal dams immediately upstream or downstream from each NPP.

The process we are proposing involves a meeting among the licensees, the U.S.

Nuclear Regulatory Commission (NRC), and USACE after the hydrographs are provided. During this meeting, any and all questions will be answered by subject matter experts (SMEs) from the USACE and NRC. Due to the sensitive security-related information in the report, the report will not be provided. The intent of the meeting is to give each licensee's representatives an opportunity to understand all of the inputs and assumptions in the analysis. We will request a preliminary list of questions be submitted in advance, and recommend you take advantage of the opportunity to the fullest extent.

2.

Please describe how cascading effects of dam breaches are accounted for during the events listed above considering that there will be in-line USACE dams and non-USACE dams both upstream and downstream of the individual dams.

USACE I NRC Answer: The USACE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.

For the basin-wide PMPIPMF, the USACE will determine if any credible dam failure scenarios would impact the PMF elevation. The USACE will route the resulting hydrographs using their hydrologic I hydraulic models.

3.

For each dam listed, please determine and describe whether a dam failure is credible during a seismic event per [Japan Lessons-Learned Project Directorate (JLD)]

JLD-ISG-2013-01 and NUREGICR-7046.

USACE I NRC Answer: The USACE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.

4.

For each dam listed, please determine and describe whether a dam failure is credible during the dam's PMF or SDF per JLD-ISG-2013-01 and NUREGICR-7046.

USACE I NRC Answer: The USACE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.

5.

For each dam listed, please determine and describe whether a dam failure is credible during the Monticello Nuclear Generating Plant I Prairie Island Nuclear Plant watershed-wide PMP and snow season PMPisnowmelt combinations per JLD-ISG-2013-01 and NUREGICR-7046.

USACE I NRC Answer: The NRC and USACE have not begun that phase of the project. For the basin-wide PMPIPMF, the USACE will determine if any credible dam failure scenarios would impact the PMF elevation. The USACE will route the resulting hydrographs using their hydrologic I hydraulic models.

6.

Please state whether the USACE dam breach hydrographs are consistent with the watershed-wide all season probable maximum precipitation (PMP) and snow season PMPisnowmelt combinations per JLD-ISG-2013-01 and NUREGICR-7046. If the hydrographs are not consistent with these inputs, then please describe the differences.

USACE I NRC Answer: Clarification is necessary. The USACE will provide the bounding basin-wide PMP scenario for each NPP site. For the PMF analysis, USACE will use appropriate dam breach assumptions as necessary analysis following JLD-ISG-2013-01 guidance.

7.

If the USACE is not able to provide hydrographs at the location of the individual dams, please describe whether hydrographs can be provided at other specific locations within the watershed; e.g. location of hypothetical dams. Xcel Energy would provide these locations to the USACE according to modeling needs.

USACE I NRC Answer: The USACE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.

Each licensee will be given in electronic form hydrographs (stage, flow and velocity) at each NPP site. The licensees may request additional hydrographs (stage, flow &

velocity) at other locations between the federal dams immediately upstream or downstream from each NPP.

8.

Please provide the USAGE's assumptions and approach to establishing the initial (starting) pool elevations at the beginning of the flood (for failure mechanisms other than sunny-day). The Dam Failure ISG states the default starting water surface elevation should be the maximum normal pool elevation (i.e., the top of the active storage pool) but that other starting water surface elevations may be used, with appropriate justification (e.g. operating rules and history).

USACE I NRC Answer: The USAGE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.

The USAGE will provide the bounding basin-wide PMP scenario for each NPP site. For the PMF analysis, USAGE will use appropriate starting water surface elevations as necessary analysis following JLD-ISG-2013-01 guidance. This analysis has not been initiated.

9.

Please describe the USAGE's approach to how failure will be triggered in the hydrologic model for the hydrologic dam failure mechanism. For example, failure could be triggered at the maximum pool during the flood, as determined by the model; the model then works out the combination of hydrographs downstream. The approach does not force peak flows from upstream dam failures to reach the plants simultaneously.

USACE I NRC Answer: The USAGE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.

For the PMF analysis, USAGE will use engineering judgment to determine the hydraulic dam failure mechanisms as appropriate. This analysis has not been initiated.

10.

Please describe the method(s) for developing the breach parameters.

USACE I NRC Answer: The USAGE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.

For the PMF analysis, USAGE will use accepted methods and engineering judgment to determine the breach parameters as appropriate. This analysis has not been initiated.

11.

Please describe the method(s) for routing the breach and flood hydrographs to the plants.

USACE I NRC Answer: The USAGE has performed a preliminary screening review using the ISG to identify non-critical dams. The results show that all dams upstream of both NPP sites are potentially screened out.

For the PMF analysis, USAGE and NRC are in the process of determining the path forward in terms of modeling approach. For new PMP/PMF analysis at other sites, HEC-HMS and HEC-RAS will be utilized.

12.

If the USAGE is unable to provide all the data requested, [Northern States Power Minnesota] NSPM would like to know which items will be provided.

USACE I NRC Answer: Each licensee will be given in electronic form hydrographs (stage, flow and velocity) at each NPP site. The licensees may request additional hydrographs (stage, flow & velocity) at other locations between the federal dams immediately upstream or downstream from each NPP.

The process we are proposing involves a meeting among the licensees, NRC, and USAGE after the hydrographs are provided. During this meeting, any and all questions will be answered by SME(s) from the USAGE and NRC. Due to the sensitive security-related information in the report, the report will not be provided. The intent of the meeting is to give each licensee's representatives an opportunity to understand all of the inputs and assumptions in the analysis. We will request a preliminary list of questions be submitted in advance, and recommend you take advantage of the opportunity to the fullest extent.

Monticello Probable Maximum Flood Related Calculations Calculation Site Specrftc PMP Storm E'<'ents MeteorologJ<:al Data Purpose of C<Jkulation cakulatton determines Site specrf*c all-season PMP lt also determmes the snow-season PMP and provides a meteorolocical tnne senes tdew pomt temperature and w1nds speed) used to define snowmelt condrtions durinc the snow-season PMP. These values are used as an mput to determine tne PMF for the watershed.

Historical meteorologiCal data has been compiled for the April 1965 and Apnl 2001 events. Data sncludes precipitation.

dew pomt temperature and snow pack data. Also, snow water equiValent ts calculated from snow pack data and other meteorological data. These data are used as tnputs to Glilbrate the HEC-HMS model.

180999.51.1003. PMF H~*drology I Thrs GllculatJOn has two components.

Calculatton uses tustoricai prectpnatton. snow water content and streamgage data to caltbrate tne HEC-HMS model The calibrated model is then used to Gllculate runoff due to prectpnat10n and snowmelt and routes the runoff to points Target Date 8/29/2014 9/12/2014 915/2014 9/19/2014 8/29/2014 cakulation Condition on Target D<Jte Draft Approved Draft Appro**ed CalculatiOn is m an unapproved state pending the followmg.

  • Refinement of calibratiOn Parameters. calibration has been completed using limllted meteorological data that results m a conservatiVe appronmation of calibrated parameters. AdditiOnal

C,a&culation Purpose of calculation Tarr:et Date calculation condition on Tarcet I I

Date I I upstream of the site usmg the meteorologiCal data has bee-n calibrated HfC*HMS model comptle-d that wouid allow further refinement of the calibration

  • Development of the new site specrfic preapitation and snowmelt u,napprowd calcu,iation mputs are based on PMP *lalues from HMR-51/52/53. Thts calculation would be updated with mputs based on site specific PMP valu,es.

!t ts not dear that this calculation tn its current state would be of any use for the US.ACE analySts

!t would be expected that the USACf would perform callbrattons/vahdations of ther routmg models Calculation Purpose of c.alcutaion nrget~te cak:ulation condition on Target Date 180999.51.1006, MNGP catculatton determined precipitatiOn and Probable Maxmum PrecipitatiOn snov.*melt for determminc run-off for the and Scnowmelt w-atershed. As part of the t\\terarchteal approach, the calculation was conservatr.<ely performed usutg PMP caiculatton is m an unapproved values based on HMR-51/52/53. Thts state pending recetpt of the calculatton also uses conservatrve tnputs from the site specific PMP parameters for estmattng snowmelt.

and further refinements of The conservative approXJrnattOns used tn 8/29/2014 snowmelt calculatJOns.

this calculation are mtended to be superseded by the site specific PMP

!t 15 not dear that this calculatton nput, and corresponding meteorologteal n its current state would be of conditions (dew potnt temperatures and any use for the USACE analysts.

Wlnd speeds) that are conStstent wrth the site specific PMP.

180999.51.1007. PMF Hydraulics CalculatiOn develops the HEC-RAS caiculatton is m an unapproved geometry for rout1ng the output from the state pending recerpt of the HfC-HMS model to deterrmne the water nputs from the site specific level at the site. calculation assumes PMP.

failure of all upstream dams texcept rncon.sequential dams). HypothetiCal The results from this calculation dams were conservat rvelv used to 8/29/2014 are very* conservatrve and not represent cluster of dams per conside-red to be reahstK. Thus, JLO-tSG-2013.01.

the Intention was to refine these values us1ng the site specific PMP.additional calibrations and more detailed informiiltton regiilrdinc the dam failures c... culation Purpose of calcu'-ion Tarcet Date calculation condition on Tarcet Date

t t5 not dear that this calculatiOn 111 its current state would be of any use for the USACE analysts.

The HEC*RAS model geometr~,

howeller. could be useful for the USACE Prairie Island Probable Maximum Flood Related Calculations Calculation Purpose of c.tlcul.ltion TctrgetOctte c.tkulation COndition on Tctrcet Date Site Speclftc PMP calculation determines srte speclftc ctli-season PMP It also determmes the snow-season PMP and provides a 8/29/2014 Draft meteorological ttme sel'le's 1 dew pomt temperature and w*nds speoedj used to deftne snowmelt condrtions durinc the snow-season PMP. These v*alues are used as an rnput to determin-e ttH! PM F for the watershed.

9/12/2014 Appro.. *ed Storm Events Meteorologtea!

Hrstorical meteorologiCal data has been 9/5/2014 Draft Data compiled for the April 1965 and Apnl 2001 events. Data tncfudes prec~pitat10n.

dew pomt temperature and snow pack data. Also, snow water equiValent ts 9/19/2014 Approved calculated from snow pack data and other meteorological data. These data are used as tnputs to calibrate the HfC-HMS model.

180999.51.1003. PMF Hydrology ThtS calculat)()n h.as two mam calculcttlon is m ctn unapproved components state pending the fo!lowtng

  • HEC-HMS model calibratiOn calculation uses tustorical
  • Refinement of calibratiOn prectprtat10n, snow water Parameters C-alibration has content and streamgage data to 8/29/2014 been completed using limited Ultbrate the HEC-HMS model meteorologiCal data that results 10 a conservatiVe
  • PMF hvdrographs The calibrated approxtmation of calibrated model IS then used to calculate parameters. AddftJonal

Calculation Purpose of calculation Tarcet Date cakulation COndition on Target Date runoff due to prec1prtation and meteorologiCal data has be+n snowmelt and routes the runoff comptled th.at would allow to potnts upstream of the srte further refinement of the usmg the calibrated HEC-HMS calibratron model.

  • Development of the new srte spectftc preopitation and snowmelt unapproved cakulation tnputs are based on PMP values from HMR-51/Sl/53. ThiS cakulation would be updated with rnputs based on srte specific PMP values.

!'t ts not dear that this calcul~tron

.nits current state would be of any use for the USACE analysts.

It would be expected that the USACf would perform caltbratiOru/vahdations of the*r routtng models Calculation Purpose of Qlcul*ion Target ~te calculation CMidition on Target D<lte 180999-51.1006, PINGP Probable Cil<uiatiOn determined precipitation and Maxmum Precipttauon and snowmelt for determtning rui'H)ff for the Snowmelt

.,,,.atershed. As part of the tuerarch&Cal approach. the ca lculat10n was conservatuel*( performed us*ng PMP calculation is m an unappro.. *ed

    • alues based on HMR-51/52/53 and u~s state pending recetpt of the
  • .-ery conservative ilppro:umatJOns to nputs values from the site extend the PMP beyond the 20,000 specific PMP and further square mfie !rnit of the HMR gui~lines refinements of ram and i1us calculatiOn also uses con~rvatJVe S/29!2014 snowmelt calculatiOns.

parameters for estmatmg snowmelt.

The consernttve approx.rmat10ns used m It rs not dear that this calculation this calculation are tntended to be 1n its current state would be of superseded by the site specrfic PMP any use for the USACE analys1s.

nput, and corresponding rneteorologJCai condttions tdew po*nt temperatures and w1nd spHds) that are conSistent wrth the site specific PMP.

180999.51.1007, PMF Hydraulics CalculatiOn develops the HEC*RA5 Cikulat1on is m an unapproved geometry for roUting the output from the st;ate pending recetpt of the H£C-HM.S model to deter!TIIne the water nputs from the site specific t<tVel it the site. calculation assumes PMP.

failure of all upstre;am d;ams (except ncons.equential dims I. HypothetiCal The results from this calculation dams v.>ere conservatrvelv used to 8/29/2014 are very conservative and not represent cluster of dams per considered to be realistiC. rhus.

Ji.D*ISG*lOH-Ql the ntention was to refine these values usmg the site specific PMP, addttional calibration and more detatled informatiOn regarding the dam failures C.alc\\Ation Purpose of ~lcul41tion Target Date cak\\Ation condition on Target Date It IS not cl~ar that this caiculatiOn lfl iu current state would be of any use for the USACE anal~ts.

Location of Hydrographs for Monticello Nuclear Generating Plant (MGNP) and Prairie Island Nuclear Generating Plant (PINGP)

Monticello Nuclear Generating Plant Please provide the following:

1.

Flow and stage hydrographs at three (3) locations:

At river mile 902.7, At river mile 900.6 (plant site), and At river mile 899.3.

2.

Maximum flow velocities (main channel and left and right overbanks) at four (4) HEC-RAS cross sections near the plant site (plant site=river mile 900.6):

At the two (2) cross sections immediately upstream of the plant site At the cross section at the plant site At the cross section immediately downstream of the plant site The exact locations of the USACE HEC-RAS model cross-sections are not known at this time. It is presumed, however, that these four (4) HEC-RAS cross sections will be within river miles 902.7 and 899. 3.

3.

Information needed to calculate wind fetch lengths and average water depth between river miles 902.7 and 894.4 Location (GIS shapefile or equivalent) of all cross sections between river miles 902.7 and 894.4.

Maximum water surface elevations at each cross section between river miles 902.7 and 894.4.

Average water depth or top width and flow area, during maximum water surface elevation, at each cross section between river miles 902.7 and 894.4.

No hydrographs are needed nor requested for these cross sections.

The data requested can be generated automatically within HEC-RAS from standard output tables.

Prairie Island Nuclear Generating Plant Please provide the following:

1.

Flow and stage hydrogr a phs at three ( 3) locations:

At river mile 803, At river mile 798 (plant site), and At river mile 797.5.

2.

Maximum flow velocities (main channel and left and right overbanks) at four (4) HEC-RAS cross sections near the plant site (plant site=river mile 798):

At the two (2) cross sections immediately upstream of the plant site At the cross section at the plant site At the cross section immediately downstream of the plant site The exact locations of the USACE HEC-RAS model cross-sections are not known at this time. It is presumed, however, that these four HEC-RAS cross sections will be within river miles 803 and 797.5.

3.

Information needed to calculate wind fetch lengths and average water depth between river mile 814 and 784.5 Location (GIS shapefile or equivalent) of all cross sections between river miles 814 and 784.5.

Maximum water surface elevations at each cross section between river miles 814 and 784.5.

Average water depth (or top width and flow area) at each cross section between river miles 814 and 784.5.

No hydrographs are needed nor requested for these cross sections.

The data requested can be generated automatically within HEC-RAS from standard output tables.

'RM90S

.. RM 9CM RM 902.7 +I*

Cross section located approximately

/

2.1 Miles upstream of MNGP RM 899.3 +1-I

~ :,

w*~

/

. Cross section located approx,mately 1.3 Miles downstream of MNGP 1 H~d"<'!;'-'Ph'.. n** "f'qdf"",ted ~~

rt ]DC1hDn 1 ' \\if' r f"!"~:lr* 90:2 to locavm ~: "'"JV nvle 900 6 plant I<'J, :md

](Jfc7jf:0n 3 '",VP" PI :If* f:.99 3}

2_

\\1riX fYhlnl >-:vP V('kl(if:('rl ii'"f*,.('(jlJtH,ft->d ?it

a. 1\\.oyo co*,s st*(t*r11Y~ rnrnr-dl::ttf*lv* tqY~t"f*arv-~ c/ thr*

plant :betvv~":<f'n IOClif,nn~;, 1

,..;vc~ rnd*** 90~ 71 rtnd 2

'"*vr-~

m:lf* ~JOO.bj}

b Tht~ c--o-:.') 'lf'tt*on ne,r tht*lnc1t1on 2. ;ptanl ~,*te:

-.*.;p* tr,,)p 900 6,

(.The cro<.,<:l Sf'*( tton :mrnf'd'?lft:..lv dovvnr~t,.(~arn o+ th(*

pl.1n1 ;lJr*lv.*f~f*n Jr'.tr_,~t.on 2 vf'~tl"'l:!f* ~-10\\)6! r~nd?,,..

._,p~

milf* gry~~ 31:

~'V.~tf:.... df"pth nt<Yrn~tron :r~cY,<:>.;,t*(l*c,n lfJCil:r*r,, rnax

'0.*;:ttr-" ",.J~'"iilf'.:'!("J,1t!On,,iru:J *'iVt'~arzf' v\\*at~"~* df*pth.j i1,..r~

Cf*q,Jr~o:,t,:*d.:11 all c~n*,(, 'if'({J'!n') L*t*twf*,**n lr.cat on'> 1; *Vf'"

n1<1r* 90.:: f! rtnd *#;,..tvt** rn,le B9t.

LJSACE:: l'<iver MiiP.~

RM89~

.. RM 894.4+1-Cross section located approximately 6.0 Miles downstream of MNGP 7

~

- *s\\,UJ~Hl H)d.

~--"-....

~-*

llltl.( j

~

Rl.t895.

\\\\!-< 1 {;i.I'T en

~"'--

_"'.... ~--h*

~

4

~'

2 3

-~~~--~~~~~iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiil Miles

RM 814 +I*

RMII1i

cross section located approximately

,fM 816

/-16

__ Miles upstream of PINGP.

sv ****-_.8-'!'f812 RMS 13 eRM811 eRM~r**

elrH RM810

/***-...,

' 1 RM809 RM808 RM807 wr s

RM 803 +I*

RM 806

./

Cross section located approximately

5 Miles upstream of PINGP RM805
  • RM 804.

RM 798.0 +I*

Cross section located at PINGP'

1. H*1d'O!::'"PIY. ;n* *r:qcJe;tr*d at.

~ lorat*on 2 :~.,u*d rnik*bQJj b IP(f1t*nn vr*~ n1 k*

plant <:,.t*':. ;md

( !nf71t/)n.; ;~;'.If*~ fl'l:h::* !~}! ~~

\\1,'1)1 fYI~Im ~.\\/t',.. V(*iOCit,f~,yf> *t*QUt*\\tf"d.1t

-1 fv;Z"* r~n<.'> *,**01nns ;mrnerlateb,: upst~r-arn ot fht'*

plant :l*~*h\\'t'!'f) loc?tt,nn'. 2 v,'<Jf'... lll'lf' 8031.1'nd 3 u;v(*' n1d+"* l~Rl!

0 TtW c**t,(,\\ '.f*ct on nf*ir lhf.. j(,Ci1tl0n 3 iPii1tlf {,ilf*i

vr*... PI
    • If*

r Th!

  • ~r*ch!n 'mmt*thr~h.*ly dc*,... n;:,t~f*arn thf' pl<tnl {bt*tv:*~*f*n !0(.1t*0n

":'Jt m:lf l9&1.:md mdf* 191 ~11 3 *~vMe_,_ rif'Pth :n 1o'm;H nn ;en*;*. <..t>rt*nn !f)CFit on

/11.1<o V;~h':<~ ',~J.;-

1,1U* f'!("J.11*flr)

~nd.1';f*'.1gf' 'v".?ltf*'"

dt*plhi a*r* **,,qdt*'=lt*d at.111

\\P>rt*nn~) b***t '.t:een lnr~t,fJn<:. 1 ****F*r rn:k* 0111) and:-..

r;'l*it*

).!

IJSACE RI'Jf!! \\lilrc.

RP.terPnCB Lcc;;:1cru:,

/

803

  • RM 801,
*~ i

,_ I '

RM 797.5 +I*

~

Cros~ section located approximately:

~-

0.5 Mtle downstream of PINGP RM 784.5 +I*

-~*\\.*

.f:':r3 f

.!. 7.92 RM 791) 789 e"'"'"\\

.Rf/4 eRM 1W!

RM 5

~.~-..."--..

-:-:-- RM 7tJ7 RM 784

.-t;,;t RM 783

. -~

  • ~*-*f': \\

FIM'

\\ 5 J

'~ '\\\\......

1 2'*

2S

~~--~~~~-iiiiiiiiiiiiiiiiiiiiiiiiiMiles

  • The NRC took an action to determine whether or not if in addition to providing the hydrographs associated with PMF study, which it believes is relevant to Prairie Island, if USACE would be willing to provide the details, including assumptions, associated with this PMF study. Xcel indicated that having the USACE PMF study as soon as possible, if available, would be helpful in its efforts of developing its own basin-wide PMF for Prairie Island which it intends to base on a site-specific probable maximum precipitation model.

The USACE was provided an opportunity to comment on this summary prior to its issuance and their comments were addressed in the final version of this summary.

Please direct any inquiries me at 301-415-1032 or at Joseph.Sebrosky@nrc.gov.

/RAJ Joseph M. Sebrosky, Senior Project Manager Hazards Management Branch Docket Nos. 50-263, 50-282, and 50-306

Enclosures:

1. Agenda
2. Xcel Questions and Answers Japan Lessons-Learned Division Office of Nuclear Reactor Regulation
3. Monticello Related Probable Maximum Flood Calculations
4. Prairie Island Probable Maximum Flood Calculations
5. Location of Hydrographs for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant (PINGP) cc w/encls: Distribution via ListServ DISTRIBUTION:

PUBLIC JLD R/F RidsNrrPMMonticello Resource RidsNrrDoriLpl3-1 RidsNrrPMPrairielsland Resource KSee, NRO RidsNrrLASLent CCook, NRO JSebrosky, NRR BHarvey, NRO RKuntz,NRO RidsRgn3MaiiCenter Resource ADAMS A ccess1on N OS.: M f

N.

ML14205A524 M ee mg ot1ce eetmg s ummary ML 14 22 OA28 3 OFFICE NRR/JLD/JHMB/PM NRR/JLD/JHMB/LA NRO/DSEAIRHM1 /BC*

NAME JSebrosky Slent CCook DATE 09/04/14 08/08/14 09/04/14 OFFICE NRR/JLD/JHMB/BC NRR/JLD/JHMB/PM NAME SWhaley JSebrosky DATE 09/08/14 09/08/14 OFFICIAL RECORD COPY

  • via email