{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:January 29, 2015
                            NUCLEAR REGULATORY COMMISSION
                                              REGION IV
                                          1600 E. LAMAR BLVD
                                      ARLINGTON, TX 76011-4511
                                          January 29, 2015
Jeremy Browning, Site Vice President  
Jeremy Browning, Site Vice President
Arkansas Nuclear One
Arkansas Nuclear One
Entergy Operations, Inc.  
Entergy Operations, Inc.
1448 SR 333  
1448 SR 333
Russellville, AR 72802-0967  
Russellville, AR 72802-0967
SUBJECT:       ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF NRC INITIAL
SUBJECT:  
                OPERATOR LICENSING EXAMINATION 05000368/2015301
ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF NRC INITIAL  
Dear Mr. Browning:
OPERATOR LICENSING EXAMINATION 05000368/2015301
In a telephone conversation on January 27, 2015, between Messrs. R. Martin, Operator
Training Superintendent, S. Garchow, Chief Examiner, and M. Bloodgood, Chief Examiner
Dear Mr. Browning:  
(Under Instruction), arrangements were made for the administration of licensing examinations
at Arkansas Nuclear One, Unit 2, during the week of August 24, 2015.
In a telephone conversation on January 27, 2015, between Messrs. R. Martin, Operator  
As agreed during the telephone conversation, the NRC will provide the written examination
Training Superintendent, S. Garchow, Chief Examiner, and M. Bloodgood, Chief Examiner  
outlines and your staff will prepare the examinations based on the guidelines in NUREG-1021,
(Under Instruction), arrangements were made for the administration of licensing examinations  
Operator Licensing Examination Standards for Power Reactors, Revision 10, and
at Arkansas Nuclear One, Unit 2, during the week of August 24, 2015.  
NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant Operators,
Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes
As agreed during the telephone conversation, the NRC will provide the written examination  
that might be necessary before the examinations are administered.
outlines and your staff will prepare the examinations based on the guidelines in NUREG-1021,  
To meet the above schedule, it will be necessary for your staff to furnish the Operating Test
Operator Licensing Examination Standards for Power Reactors, Revision 10, and  
outlines by May 22, 2015. The written examinations, operating tests, and supporting reference
NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant Operators,  
materials identified in Attachment 3 to ES-201 will be due by June 22, 2015. Pursuant to
Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes  
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an
that might be necessary before the examinations are administered.  
authorized representative of the facility licensee shall approve the outlines, examinations, and
tests before they are submitted to the NRC for review and approval. All materials shall be
To meet the above schedule, it will be necessary for your staff to furnish the Operating Test  
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or
outlines by May 22, 2015. The written examinations, operating tests, and supporting reference  
safeguards information in your response be contained in a separate enclosure and appropriately
materials identified in Attachment 3 to ES-201 will be due by June 22, 2015. Pursuant to  
marked. Any delay in receiving the required examinations and reference materials, or the
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an  
submittal of inadequate or incomplete materials, may cause the examinations to be
authorized representative of the facility licensee shall approve the outlines, examinations, and  
rescheduled. In addition, your support for on-site validation of the examinations is required
tests before they are submitted to the NRC for review and approval. All materials shall be  
during the week of July 27, 2015.
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or  
safeguards information in your response be contained in a separate enclosure and appropriately  
marked. Any delay in receiving the required examinations and reference materials, or the  
submittal of inadequate or incomplete materials, may cause the examinations to be  
rescheduled. In addition, your support for on-site validation of the examinations is required  
during the week of July 27, 2015.  
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511


J. Browning                                     -2-
J. Browning  
In order to conduct the requested written examinations and operating tests, it will be necessary
- 2 -  
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
In order to conduct the requested written examinations and operating tests, it will be necessary  
your staff should retain the original simulator performance data (e.g., system pressures,
for your staff to provide adequate space and accommodations in accordance with ES-402, and  
temperatures, and levels) generated during the dynamic operating tests until the examination
to make the simulation facility available on the dates noted above. In accordance with ES-302,  
results are final.
your staff should retain the original simulator performance data (e.g., system pressures,  
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
temperatures, and levels) generated during the dynamic operating tests until the examination  
effect while the written examinations and operating tests are being administered.
results are final.  
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in  
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
effect while the written examinations and operating tests are being administered.  
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
To permit timely NRC review and evaluation, your staff should submit preliminary operator and  
date, a postponement may be necessary. Signed applications certifying that all training has
senior operator license applications (Office of Management and Budget (OMB) approval  
been completed should be submitted at least 14 days before the first examination date.
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver  
This letter contains information collections that are subject to the Paperwork Reduction Act
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first  
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
examination date. If the applications are not received at least 30 days before the examination  
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
date, a postponement may be necessary. Signed applications certifying that all training has  
this collection of information is estimated to average 50 hours per response, including the time
been completed should be submitted at least 14 days before the first examination date.  
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
This letter contains information collections that are subject to the Paperwork Reduction Act  
other aspect of these information collections, including suggestions for reducing the burden, to
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under  
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for  
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
this collection of information is estimated to average 50 hours per response, including the time  
INFOCOLLECTS@NRC.GOV.
for reviewing instructions, gathering and maintaining the data needed, and completing and  
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
reviewing the collection of information. Send comments regarding this burden estimate or any  
information collection, unless it displays a currently valid OMB control number.
other aspect of these information collections, including suggestions for reducing the burden, to  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory  
available electronically for public inspection in the NRCs Public Document Room or from the
Commission, Washington, DC 20555-0001, or by Internet electronic mail to  
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
INFOCOLLECTS@NRC.GOV.
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
information collection, unless it displays a currently valid OMB control number.  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be  
available electronically for public inspection in the NRCs Public Document Room or from the  
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access  
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room  
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.


J. Browning                                   -3-
J. Browning  
Thank you for your cooperation in this matter. Mr. Martin has been advised of the policies and
- 3 -  
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Michael Bloodgood at 817-200-1544, Steve Garchow
Thank you for your cooperation in this matter. Mr. Martin has been advised of the policies and  
at 817-200-1426, or myself at 817-200-1159.
guidelines referenced in this letter. If you have any questions regarding the NRCs examination  
                                                Sincerely,
procedures and guidelines, please contact Michael Bloodgood at 817-200-1544, Steve Garchow  
                                                /RA/
at 817-200-1426, or myself at 817-200-1159.  
                                                Vincent G. Gaddy, Chief
                                                Operations Branch
                                                Division of Reactor Safety
Sincerely,
Docket No. 50-368
License No. NPF-6
cc w/ encl: Electronic Distribution
/RA/  
Vincent G. Gaddy, Chief  
Operations Branch  
Division of Reactor Safety  
Docket No. 50-368  
License No. NPF-6  
cc w/ encl: Electronic Distribution  




ML15029A523
  ML15029A523  
  SUNSI Review         ADAMS                Publicly Available        Non-Sensitive Keyword:
  SUNSI Review  
By: MBloodgood         Yes  No            Non-Publicly Available   Sensitive     NRC-002
By: MBloodgood  
OFFICE       OE:OB             SOE:OB         C:OB
ADAMS
NAME         MBloodgood/dch SGarchow         VGaddy
Yes   No
SIGNATURE /RA/                 /RA/ E-mail   /RA/
Publicly Available
DATE         1/29/15         1/29/15       1/29/15
  Non-Publicly Available  
                                       
Non-Sensitive
Letter to Jeremy Browning from Vincent G. Gaddy, dated January 29, 2015
Sensitive  
SUBJECT:       ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF NRC INITIAL
Keyword:
                OPERATOR LICENSING EXAMINATION 05000368/2015301
NRC-002  
DISTRIBUTION:
OFFICE  
Regional Administrator (Marc.Dapas@nrc.gov)
OE:OB  
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
SOE:OB  
DRP Director (Troy.Pruett@nrc.gov)
C:OB  
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)
Resident Inspector (Matt.Young@nrc.gov)
NAME  
Resident Inspector (Abin.Fairbanks@nrc.gov)
MBloodgood/dch  
Branch Chief, DRP/E (Ryan.Lantz@nrc.gov)
SGarchow  
Senior Project Engineer, DRP/E (Cale.Young@nrc.gov)
VGaddy  
Project Engineer, DRP/E (Jim.Melfi@nrc.gov)
Operations Lead Administrative Assistant (Laura.Hurley@nrc.gov)
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
SIGNATURE  
Project Manager (Andrea.George@nrc.gov)
/RA/  
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
/RA/   E-mail  
ACES (R4Enforcement.Resource@nrc.gov)
/RA/  
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
DATE  
1/29/15  
1/29/15  
1/29/15  
 
Letter to Jeremy Browning from Vincent G. Gaddy, dated January 29, 2015  
SUBJECT:  
ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF NRC INITIAL  
OPERATOR LICENSING EXAMINATION 05000368/2015301
DISTRIBUTION:  
Regional Administrator (Marc.Dapas@nrc.gov)  
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)  
DRP Director (Troy.Pruett@nrc.gov)  
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)  
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)  
Resident Inspector (Matt.Young@nrc.gov)  
Resident Inspector (Abin.Fairbanks@nrc.gov)  
Branch Chief, DRP/E (Ryan.Lantz@nrc.gov)  
Senior Project Engineer, DRP/E (Cale.Young@nrc.gov)  
Project Engineer, DRP/E (Jim.Melfi@nrc.gov)  
Operations Lead Administrative Assistant (Laura.Hurley@nrc.gov)  
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Project Manager (Andrea.George@nrc.gov)  
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)  
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
}}
}}

Latest revision as of 14:46, 10 January 2025

Notification of NRC Initial Operator Licensing Examination 05000368/2015301
ML15029A523
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/29/2015
From: Vincent Gaddy
Operations Branch IV
To: Jeremy G. Browning
Entergy Operations
References
50-368/15-301
Download: ML15029A523 (5)


See also: IR 05000368/2015301

Text

January 29, 2015

Jeremy Browning, Site Vice President

Arkansas Nuclear One

Entergy Operations, Inc.

1448 SR 333

Russellville, AR 72802-0967

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF NRC INITIAL

OPERATOR LICENSING EXAMINATION 05000368/2015301

Dear Mr. Browning:

In a telephone conversation on January 27, 2015, between Messrs. R. Martin, Operator

Training Superintendent, S. Garchow, Chief Examiner, and M. Bloodgood, Chief Examiner

(Under Instruction), arrangements were made for the administration of licensing examinations

at Arkansas Nuclear One, Unit 2, during the week of August 24, 2015.

As agreed during the telephone conversation, the NRC will provide the written examination

outlines and your staff will prepare the examinations based on the guidelines in NUREG-1021,

Operator Licensing Examination Standards for Power Reactors, Revision 10, and

NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant Operators,

Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes

that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the Operating Test

outlines by May 22, 2015. The written examinations, operating tests, and supporting reference

materials identified in Attachment 3 to ES-201 will be due by June 22, 2015. Pursuant to

Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an

authorized representative of the facility licensee shall approve the outlines, examinations, and

tests before they are submitted to the NRC for review and approval. All materials shall be

complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or

safeguards information in your response be contained in a separate enclosure and appropriately

marked. Any delay in receiving the required examinations and reference materials, or the

submittal of inadequate or incomplete materials, may cause the examinations to be

rescheduled. In addition, your support for on-site validation of the examinations is required

during the week of July 27, 2015.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

J. Browning

- 2 -

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act

of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

J. Browning

- 3 -

Thank you for your cooperation in this matter. Mr. Martin has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Michael Bloodgood at 817-200-1544, Steve Garchow

at 817-200-1426, or myself at 817-200-1159.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket No. 50-368

License No. NPF-6

cc w/ encl: Electronic Distribution

ML15029A523

SUNSI Review

By: MBloodgood

ADAMS

Yes No

Publicly Available

Non-Publicly Available

Non-Sensitive

Sensitive

Keyword:

NRC-002

OFFICE

OE:OB

SOE:OB

C:OB

NAME

MBloodgood/dch

SGarchow

VGaddy

SIGNATURE

/RA/

/RA/ E-mail

/RA/

DATE

1/29/15

1/29/15

1/29/15

Letter to Jeremy Browning from Vincent G. Gaddy, dated January 29, 2015

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF NRC INITIAL

OPERATOR LICENSING EXAMINATION 05000368/2015301

DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Brian.Tindell@nrc.gov)

Resident Inspector (Matt.Young@nrc.gov)

Resident Inspector (Abin.Fairbanks@nrc.gov)

Branch Chief, DRP/E (Ryan.Lantz@nrc.gov)

Senior Project Engineer, DRP/E (Cale.Young@nrc.gov)

Project Engineer, DRP/E (Jim.Melfi@nrc.gov)

Operations Lead Administrative Assistant (Laura.Hurley@nrc.gov)

ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Andrea.George@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)