ML15029A523: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:January 29, 2015 | ||
Jeremy Browning, Site Vice President | |||
Jeremy Browning, Site Vice President | Arkansas Nuclear One | ||
Arkansas Nuclear One | Entergy Operations, Inc. | ||
Entergy Operations, Inc. | 1448 SR 333 | ||
1448 SR 333 | Russellville, AR 72802-0967 | ||
Russellville, AR 72802-0967 | |||
SUBJECT: | SUBJECT: | ||
ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF NRC INITIAL | |||
Dear Mr. Browning: | OPERATOR LICENSING EXAMINATION 05000368/2015301 | ||
In a telephone conversation on January 27, 2015, between Messrs. R. Martin, Operator | |||
Training Superintendent, S. Garchow, Chief Examiner, and M. Bloodgood, Chief Examiner | Dear Mr. Browning: | ||
(Under Instruction), arrangements were made for the administration of licensing examinations | |||
at Arkansas Nuclear One, Unit 2, during the week of August 24, 2015. | In a telephone conversation on January 27, 2015, between Messrs. R. Martin, Operator | ||
As agreed during the telephone conversation, the NRC will provide the written examination | Training Superintendent, S. Garchow, Chief Examiner, and M. Bloodgood, Chief Examiner | ||
outlines and your staff will prepare the examinations based on the guidelines in NUREG-1021, | (Under Instruction), arrangements were made for the administration of licensing examinations | ||
Operator Licensing Examination Standards for Power Reactors, Revision 10, and | at Arkansas Nuclear One, Unit 2, during the week of August 24, 2015. | ||
NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant Operators, | |||
Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes | As agreed during the telephone conversation, the NRC will provide the written examination | ||
that might be necessary before the examinations are administered. | outlines and your staff will prepare the examinations based on the guidelines in NUREG-1021, | ||
To meet the above schedule, it will be necessary for your staff to furnish the Operating Test | Operator Licensing Examination Standards for Power Reactors, Revision 10, and | ||
outlines by May 22, 2015. The written examinations, operating tests, and supporting reference | NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant Operators, | ||
materials identified in Attachment 3 to ES-201 will be due by June 22, 2015. Pursuant to | Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes | ||
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an | that might be necessary before the examinations are administered. | ||
authorized representative of the facility licensee shall approve the outlines, examinations, and | |||
tests before they are submitted to the NRC for review and approval. All materials shall be | To meet the above schedule, it will be necessary for your staff to furnish the Operating Test | ||
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or | outlines by May 22, 2015. The written examinations, operating tests, and supporting reference | ||
safeguards information in your response be contained in a separate enclosure and appropriately | materials identified in Attachment 3 to ES-201 will be due by June 22, 2015. Pursuant to | ||
marked. Any delay in receiving the required examinations and reference materials, or the | Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an | ||
submittal of inadequate or incomplete materials, may cause the examinations to be | authorized representative of the facility licensee shall approve the outlines, examinations, and | ||
rescheduled. In addition, your support for on-site validation of the examinations is required | tests before they are submitted to the NRC for review and approval. All materials shall be | ||
during the week of July 27, 2015. | complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or | ||
safeguards information in your response be contained in a separate enclosure and appropriately | |||
marked. Any delay in receiving the required examinations and reference materials, or the | |||
submittal of inadequate or incomplete materials, may cause the examinations to be | |||
rescheduled. In addition, your support for on-site validation of the examinations is required | |||
during the week of July 27, 2015. | |||
UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
1600 E. LAMAR BLVD | |||
ARLINGTON, TX 76011-4511 | |||
J. Browning | J. Browning | ||
In order to conduct the requested written examinations and operating tests, it will be necessary | - 2 - | ||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | |||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | In order to conduct the requested written examinations and operating tests, it will be necessary | ||
your staff should retain the original simulator performance data (e.g., system pressures, | for your staff to provide adequate space and accommodations in accordance with ES-402, and | ||
temperatures, and levels) generated during the dynamic operating tests until the examination | to make the simulation facility available on the dates noted above. In accordance with ES-302, | ||
results are final. | your staff should retain the original simulator performance data (e.g., system pressures, | ||
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in | temperatures, and levels) generated during the dynamic operating tests until the examination | ||
effect while the written examinations and operating tests are being administered. | results are final. | ||
To permit timely NRC review and evaluation, your staff should submit preliminary operator and | |||
senior operator license applications (Office of Management and Budget (OMB) approval | Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in | ||
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver | effect while the written examinations and operating tests are being administered. | ||
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first | |||
examination date. If the applications are not received at least 30 days before the examination | To permit timely NRC review and evaluation, your staff should submit preliminary operator and | ||
date, a postponement may be necessary. Signed applications certifying that all training has | senior operator license applications (Office of Management and Budget (OMB) approval | ||
been completed should be submitted at least 14 days before the first examination date. | number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver | ||
This letter contains information collections that are subject to the Paperwork Reduction Act | requests (if any) (OMB approval number 3150-0090) at least 30 days before the first | ||
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | examination date. If the applications are not received at least 30 days before the examination | ||
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for | date, a postponement may be necessary. Signed applications certifying that all training has | ||
this collection of information is estimated to average 50 hours per response, including the time | been completed should be submitted at least 14 days before the first examination date. | ||
for reviewing instructions, gathering and maintaining the data needed, and completing and | |||
reviewing the collection of information. Send comments regarding this burden estimate or any | This letter contains information collections that are subject to the Paperwork Reduction Act | ||
other aspect of these information collections, including suggestions for reducing the burden, to | of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | ||
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory | approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for | ||
Commission, Washington, DC 20555-0001, or by Internet electronic mail to | this collection of information is estimated to average 50 hours per response, including the time | ||
INFOCOLLECTS@NRC.GOV. | for reviewing instructions, gathering and maintaining the data needed, and completing and | ||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | reviewing the collection of information. Send comments regarding this burden estimate or any | ||
information collection, unless it displays a currently valid OMB control number. | other aspect of these information collections, including suggestions for reducing the burden, to | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory | ||
available electronically for public inspection in the NRCs Public Document Room or from the | Commission, Washington, DC 20555-0001, or by Internet electronic mail to | ||
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access | INFOCOLLECTS@NRC.GOV. | ||
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room | |||
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html. | The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | ||
information collection, unless it displays a currently valid OMB control number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | |||
available electronically for public inspection in the NRCs Public Document Room or from the | |||
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access | |||
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room | |||
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
J. Browning | J. Browning | ||
Thank you for your cooperation in this matter. Mr. Martin has been advised of the policies and | - 3 - | ||
guidelines referenced in this letter. If you have any questions regarding the NRCs examination | |||
procedures and guidelines, please contact Michael Bloodgood at 817-200-1544, Steve Garchow | Thank you for your cooperation in this matter. Mr. Martin has been advised of the policies and | ||
at 817-200-1426, or myself at 817-200-1159. | guidelines referenced in this letter. If you have any questions regarding the NRCs examination | ||
procedures and guidelines, please contact Michael Bloodgood at 817-200-1544, Steve Garchow | |||
at 817-200-1426, or myself at 817-200-1159. | |||
Sincerely, | |||
Docket No. 50-368 | |||
License No. NPF-6 | |||
cc w/ encl: Electronic Distribution | /RA/ | ||
Vincent G. Gaddy, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket No. 50-368 | |||
License No. NPF-6 | |||
cc w/ encl: Electronic Distribution | |||
ML15029A523 | |||
SUNSI Review | SUNSI Review | ||
By: MBloodgood | By: MBloodgood | ||
OFFICE | ADAMS | ||
NAME | Yes No | ||
SIGNATURE /RA/ | Publicly Available | ||
DATE | Non-Publicly Available | ||
Non-Sensitive | |||
Letter to Jeremy Browning from Vincent G. Gaddy, dated January 29, 2015 | Sensitive | ||
SUBJECT: | Keyword: | ||
NRC-002 | |||
DISTRIBUTION: | OFFICE | ||
Regional Administrator (Marc.Dapas@nrc.gov) | OE:OB | ||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | SOE:OB | ||
DRP Director (Troy.Pruett@nrc.gov) | C:OB | ||
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Brian.Tindell@nrc.gov) | |||
Resident Inspector (Matt.Young@nrc.gov) | NAME | ||
Resident Inspector (Abin.Fairbanks@nrc.gov) | MBloodgood/dch | ||
Branch Chief, DRP/E (Ryan.Lantz@nrc.gov) | SGarchow | ||
Senior Project Engineer, DRP/E (Cale.Young@nrc.gov) | VGaddy | ||
Project Engineer, DRP/E (Jim.Melfi@nrc.gov) | |||
Operations Lead Administrative Assistant (Laura.Hurley@nrc.gov) | |||
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Public Affairs Officer (Lara.Uselding@nrc.gov) | SIGNATURE | ||
Project Manager (Andrea.George@nrc.gov) | /RA/ | ||
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | /RA/ E-mail | ||
ACES (R4Enforcement.Resource@nrc.gov) | /RA/ | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | DATE | ||
1/29/15 | |||
1/29/15 | |||
1/29/15 | |||
Letter to Jeremy Browning from Vincent G. Gaddy, dated January 29, 2015 | |||
SUBJECT: | |||
ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF NRC INITIAL | |||
OPERATOR LICENSING EXAMINATION 05000368/2015301 | |||
DISTRIBUTION: | |||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
DRP Director (Troy.Pruett@nrc.gov) | |||
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Brian.Tindell@nrc.gov) | |||
Resident Inspector (Matt.Young@nrc.gov) | |||
Resident Inspector (Abin.Fairbanks@nrc.gov) | |||
Branch Chief, DRP/E (Ryan.Lantz@nrc.gov) | |||
Senior Project Engineer, DRP/E (Cale.Young@nrc.gov) | |||
Project Engineer, DRP/E (Jim.Melfi@nrc.gov) | |||
Operations Lead Administrative Assistant (Laura.Hurley@nrc.gov) | |||
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Public Affairs Officer (Lara.Uselding@nrc.gov) | |||
Project Manager (Andrea.George@nrc.gov) | |||
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
RIV/ETA: OEDO (Michael.Waters@nrc.gov) | RIV/ETA: OEDO (Michael.Waters@nrc.gov) | ||
}} | }} | ||
Latest revision as of 14:46, 10 January 2025
| ML15029A523 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 01/29/2015 |
| From: | Vincent Gaddy Operations Branch IV |
| To: | Jeremy G. Browning Entergy Operations |
| References | |
| 50-368/15-301 | |
| Download: ML15029A523 (5) | |
See also: IR 05000368/2015301
Text
January 29, 2015
Jeremy Browning, Site Vice President
Arkansas Nuclear One
Entergy Operations, Inc.
1448 SR 333
Russellville, AR 72802-0967
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF NRC INITIAL
OPERATOR LICENSING EXAMINATION 05000368/2015301
Dear Mr. Browning:
In a telephone conversation on January 27, 2015, between Messrs. R. Martin, Operator
Training Superintendent, S. Garchow, Chief Examiner, and M. Bloodgood, Chief Examiner
(Under Instruction), arrangements were made for the administration of licensing examinations
at Arkansas Nuclear One, Unit 2, during the week of August 24, 2015.
As agreed during the telephone conversation, the NRC will provide the written examination
outlines and your staff will prepare the examinations based on the guidelines in NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, Revision 10, and
NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant Operators,
Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes
that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the Operating Test
outlines by May 22, 2015. The written examinations, operating tests, and supporting reference
materials identified in Attachment 3 to ES-201 will be due by June 22, 2015. Pursuant to
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an
authorized representative of the facility licensee shall approve the outlines, examinations, and
tests before they are submitted to the NRC for review and approval. All materials shall be
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or
safeguards information in your response be contained in a separate enclosure and appropriately
marked. Any delay in receiving the required examinations and reference materials, or the
submittal of inadequate or incomplete materials, may cause the examinations to be
rescheduled. In addition, your support for on-site validation of the examinations is required
during the week of July 27, 2015.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511
J. Browning
- 2 -
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
J. Browning
- 3 -
Thank you for your cooperation in this matter. Mr. Martin has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Michael Bloodgood at 817-200-1544, Steve Garchow
at 817-200-1426, or myself at 817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket No. 50-368
License No. NPF-6
cc w/ encl: Electronic Distribution
SUNSI Review
By: MBloodgood
Yes No
Publicly Available
Non-Publicly Available
Non-Sensitive
Sensitive
Keyword:
OFFICE
OE:OB
SOE:OB
C:OB
NAME
MBloodgood/dch
SGarchow
VGaddy
SIGNATURE
/RA/
/RA/ E-mail
/RA/
DATE
1/29/15
1/29/15
1/29/15
Letter to Jeremy Browning from Vincent G. Gaddy, dated January 29, 2015
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF NRC INITIAL
OPERATOR LICENSING EXAMINATION 05000368/2015301
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)
Resident Inspector (Matt.Young@nrc.gov)
Resident Inspector (Abin.Fairbanks@nrc.gov)
Branch Chief, DRP/E (Ryan.Lantz@nrc.gov)
Senior Project Engineer, DRP/E (Cale.Young@nrc.gov)
Project Engineer, DRP/E (Jim.Melfi@nrc.gov)
Operations Lead Administrative Assistant (Laura.Hurley@nrc.gov)
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Andrea.George@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)