{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                              NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                  REGION III
REGION III  
                                      2443 WARRENVILLE RD. SUITE 210
2443 WARRENVILLE RD. SUITE 210  
                                            LISLE, IL 60532-4352
LISLE, IL 60532-4352  
                                              October 28, 2015
EA-15-206
October 28, 2015  
Mr. Peter A. Gardner
Site Vice President
EA-15-206  
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
Mr. Peter A. Gardner  
2807 West County Road 75
Site Vice President  
Monticello, MN 55362-9637
Monticello Nuclear Generating Plant  
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF
Northern States Power Company, Minnesota  
              DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
2807 West County Road 75  
Dear Mr. Gardner:
Monticello, MN 55362-9637  
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),
dated October 2, 2015, that provided a response to our inspection report issued on
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF  
September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.
DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007  
The letter we received contested a Non-Cited Violation (NCV) documented in Monticello
Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of
Dear Mr. Gardner:  
Application Safety-Related Relays Installed Beyond Their Service Life.
We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),  
thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon
dated October 2, 2015, that provided a response to our inspection report issued on  
as we complete our evaluation.
September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
The letter we received contested a Non-Cited Violation (NCV) documented in Monticello  
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of  
of this letter will be available electronically for public inspection in the NRCs Public Document
Application Safety-Related Relays Installed Beyond Their Service Life.  
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be  
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon  
                                                  Sincerely,
as we complete our evaluation.  
                                                  /RA/
                                                  Christine A. Lipa, Chief
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public  
                                                  Engineering Branch 2
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy  
                                                  Division of Reactor Safety
of this letter will be available electronically for public inspection in the NRCs Public Document  
Docket No. 50-263
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide  
License No. DPR-22
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC  
cc: Distribution via LISTSERV
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Sincerely,  
/RA/  
Christine A. Lipa, Chief  
Engineering Branch 2  
Division of Reactor Safety  
Docket No. 50-263  
License No. DPR-22  
cc: Distribution via LISTSERV


EA-15-206
Mr. Peter A. Gardner
Site Vice President
EA-15-206  
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
Mr. Peter A. Gardner  
2807 West County Road 75
Site Vice President  
Monticello, MN 55362-9637
Monticello Nuclear Generating Plant  
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF
Northern States Power Company, Minnesota  
                    DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
2807 West County Road 75  
Dear Mr. Gardner:
Monticello, MN 55362-9637  
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),
dated October 2, 2015, that provided a response to our inspection report issued on
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF  
September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.
DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007  
The letter we received contested a Non-Cited Violation (NCV) documented in Monticello
Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of
Dear Mr. Gardner:  
Application Safety-Related Relays Installed Beyond Their Service Life.
We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),  
thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon
dated October 2, 2015, that provided a response to our inspection report issued on  
as we complete our evaluation.
September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
The letter we received contested a Non-Cited Violation (NCV) documented in Monticello  
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of  
of this letter will be available electronically for public inspection in the NRCs Public Document
Application Safety-Related Relays Installed Beyond Their Service Life.  
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be  
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon  
                                                                          Sincerely,
as we complete our evaluation.  
                                                                          /RA/
                                                                          Christine A. Lipa, Chief
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public  
                                                                          Engineering Branch 2
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy  
                                                                          Division of Reactor Safety
of this letter will be available electronically for public inspection in the NRCs Public Document  
Docket No. 50-263
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide  
License No. DPR-22
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC  
cc: Distribution via LISTSERV
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
DISTRIBUTION:
Sincerely,  
See next page
/RA/  
ADAMS Accession Number ML15301A814
Christine A. Lipa, Chief  
    Publicly Available                           Non-Publicly Available                     Sensitive               Non-Sensitive
Engineering Branch 2  
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
Division of Reactor Safety  
  OFFICE             RIII                               RIII                           RIII                               RIII
  NAME               ADunlop                             RSkokowski                     CLipa
Docket No. 50-263  
  DATE               10/26/15                           10/26/15                       10/28/15
License No. DPR-22  
                                                              OFFICIAL RECORD COPY
cc: Distribution via LISTSERV  
DISTRIBUTION:  
See next page  
ADAMS Accession Number ML15301A814  
Publicly Available  
Non-Publicly Available  
Sensitive  
Non-Sensitive  
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy  
OFFICE  
RIII  
RIII  
RIII  
RIII  
NAME  
ADunlop  
RSkokowski  
CLipa  
DATE  
10/26/15  
10/26/15  
10/28/15  
OFFICIAL RECORD COPY  


Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated October 28, 2015.
Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated October 28, 2015.  
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF
            DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF  
DISTRIBUTION:
DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007  
Janelle Jessie
RidsNrrDorlLpl3-1 Resource
DISTRIBUTION:  
RidsNrrPMMonticello
Janelle Jessie  
RidsNrrDirsIrib Resource
RidsNrrDorlLpl3-1 Resource
Cynthia Pederson
RidsNrrPMMonticello  
Darrell Roberts
RidsNrrDirsIrib Resource  
Richard Skokowski
Cynthia Pederson  
Allan Barker
Darrell Roberts  
Carole Ariano
Richard Skokowski  
Linda Linn
Allan Barker  
DRPIII
Carole Ariano  
DRSIII
Linda Linn  
Jim Clay
DRPIII  
Carmen Olteanu
DRSIII  
Jim Clay  
Carmen Olteanu  
ROPreports.Resource@nrc.gov
ROPreports.Resource@nrc.gov
}}
}}

Latest revision as of 06:50, 10 January 2025

Acknowledgment of Disputed Violation of NRC Inspection Report 05000263/2015007 (Bxj)
ML15301A814
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/28/2015
From: Christine Lipa
NRC/RGN-III/DRS/EB2
To: Gardner P
Northern States Power Co
References
EA-15-206, IR 2015007
Download: ML15301A814 (3)


See also: IR 05000263/2015007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

October 28, 2015

EA-15-206

Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF

DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007

Dear Mr. Gardner:

This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),

dated October 2, 2015, that provided a response to our inspection report issued on

September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.

The letter we received contested a Non-Cited Violation (NCV) documented in Monticello

Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of

Application Safety-Related Relays Installed Beyond Their Service Life.

We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be

thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon

as we complete our evaluation.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

cc: Distribution via LISTSERV

EA-15-206

Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF

DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007

Dear Mr. Gardner:

This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),

dated October 2, 2015, that provided a response to our inspection report issued on

September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.

The letter we received contested a Non-Cited Violation (NCV) documented in Monticello

Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of

Application Safety-Related Relays Installed Beyond Their Service Life.

We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be

thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon

as we complete our evaluation.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

cc: Distribution via LISTSERV

DISTRIBUTION:

See next page

ADAMS Accession Number ML15301A814

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE

RIII

RIII

RIII

RIII

NAME

ADunlop

RSkokowski

CLipa

DATE

10/26/15

10/26/15

10/28/15

OFFICIAL RECORD COPY

Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated October 28, 2015.

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF

DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007

DISTRIBUTION:

Janelle Jessie

RidsNrrDorlLpl3-1 Resource

RidsNrrPMMonticello

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Jim Clay

Carmen Olteanu

ROPreports.Resource@nrc.gov