| title = Ltr 10/28/15 Monticello Nuclear Generating Plant Acknowledgment of Disputed Violation of NRC Inspection Report 05000263/2015007 (Bxj)
| title = Acknowledgment of Disputed Violation of NRC Inspection Report 05000263/2015007 (Bxj)
| author name = Lipa C
| author name = Lipa C
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
REGION III 2443 WARRENVILLE RD. SUIT
REGION III  
E 210 LISLE, IL  60532
2443 WARRENVILLE RD. SUITE 210
-4352 October 28, 2015
LISLE, IL  60532-4352  
  EA-15-206  Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362
-9637  SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
ACKNOWLEDGMENT
OF DISPUTED VIOLATION OF NRC INSPECTION
REPORT 05000263/2015007
  Dear Mr. Gardner:  This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),
dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.  The letter we
received contested a Non
-Cited Violation (NCV) documented in Monticello
Inspection
Report 2015007.  The contested NCV is
"Failure to Review for Suitability of Application Safety
-Related Relays Installed Beyond Their Service Life."
  We are currently reviewing your basis for contesting
the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses.
  Accordingly, we will inform you as soon as we complete our evaluation.
 
In accordance with Title 10 of the Code of Federal Regulations
  (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
   
   
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
October 28, 2015  
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, 
/RA/  Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
  Docket No. 50
-263 License No. DPR
-22  cc:  Distribution via LISTSERV
  EA-15-206  Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362
-9637  SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
ACKNOWLEDGMENT
OF DISPUTED VIOLATION OF NRC INSPECTION
REPORT 05000263/2015007
  Dear Mr. Gardner:  This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.  The letter we
received contested a Non
-Cited Violation (NCV) documented in Monticello
Inspection
Report 2015007.  The contested NCV is
"Failure to Review for Suitability of Application Safety
-Related Relays Installed Beyond Their Service Life."
  We are currently reviewing your basis for contesting
the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses.
  Accordingly, we will inform you as soon as we complete our evaluation.
  In accordance with Title 10 of the Code of Federal Regulations
  (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA/ Christine A. Lipa, Chief
Engineering Branch 2
   
   
Division of Reactor Safety
EA-15-206
  Docket No. 50
-263 License No. DPR
-22 cc:  Distribution via LISTSERV
DISTRIBUTION:
See next page
ADAMS Accession Number ML15301A814
  Publicly Available
  Non-Publicly Available
  Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/enc
l "N" = No copy
OFFICE RIII  RIII  RIII  RIII  NAME ADunlop RSkokowski
CLipa  DATE 10/26/15 10/26/15 10/28/15  OFFICIAL RECORD COPY
 
Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated
October 28, 2015.
  SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
ACKNOWLEDGMENT
OF DISPUTED VIOLATION OF NRC INSPECTION
REPORT 05000263/2015007
  DISTRIBUTION
: Janelle Jessie
   
   
RidsNrrDorlLpl3
Mr. Peter A. Gardner
-1 Resource
Site Vice President
  RidsNrrPMMonticello
Monticello Nuclear Generating Plant
RidsNrrDirsIrib Resource
Northern States Power Company, Minnesota
Cynthia Pederson
2807 West County Road 75
Darrell Roberts
Monticello, MN 55362-9637
Richard Skokowski
Allan Barker Carole Ariano
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF
Linda Linn
DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
DRPIII DRSIII Jim Clay Carmen Olteanu
ROPreports.Resource@nrc.gov
Dear Mr. Gardner:
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),
dated October 2, 2015, that provided a response to our inspection report issued on
September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. 
The letter we received contested a Non-Cited Violation (NCV) documented in Monticello
Inspection Report 2015007.  The contested NCV is Failure to Review for Suitability of
Application Safety-Related Relays Installed Beyond Their Service Life.
We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be
thorough and timely in the review of licensee responses.  Accordingly, we will inform you as soon
as we complete our evaluation.
In accordance with Title 10 of the Code of Federal Regulations  (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-263
License No. DPR-22
cc:  Distribution via LISTSERV
 
EA-15-206
Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362-9637
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF
DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
Dear Mr. Gardner:
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),
dated October 2, 2015, that provided a response to our inspection report issued on
September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. 
The letter we received contested a Non-Cited Violation (NCV) documented in Monticello
Inspection Report 2015007.  The contested NCV is Failure to Review for Suitability of
Application Safety-Related Relays Installed Beyond Their Service Life.
We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be
thorough and timely in the review of licensee responses.  Accordingly, we will inform you as soon
as we complete our evaluation.
In accordance with Title 10 of the Code of Federal Regulations  (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-263
License No. DPR-22
cc:  Distribution via LISTSERV
DISTRIBUTION:
See next page
ADAMS Accession Number ML15301A814
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE
RIII
RIII
RIII
RIII
NAME
ADunlop
RSkokowski
CLipa
DATE
10/26/15
10/26/15
10/28/15
OFFICIAL RECORD COPY
 
Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated October 28, 2015.
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF
DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
DISTRIBUTION:
Janelle Jessie
RidsNrrDorlLpl3-1 Resource
RidsNrrPMMonticello  
RidsNrrDirsIrib Resource  
Cynthia Pederson  
Darrell Roberts  
Richard Skokowski  
Allan Barker  
Carole Ariano  
Linda Linn  
DRPIII  
DRSIII  
Jim Clay  
Carmen Olteanu  
ROPreports.Resource@nrc.gov
}}
}}

Latest revision as of 06:50, 10 January 2025

Acknowledgment of Disputed Violation of NRC Inspection Report 05000263/2015007 (Bxj)
ML15301A814
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/28/2015
From: Christine Lipa
NRC/RGN-III/DRS/EB2
To: Gardner P
Northern States Power Co
References
EA-15-206, IR 2015007
Download: ML15301A814 (3)


See also: IR 05000263/2015007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

October 28, 2015

EA-15-206

Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF

DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007

Dear Mr. Gardner:

This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),

dated October 2, 2015, that provided a response to our inspection report issued on

September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.

The letter we received contested a Non-Cited Violation (NCV) documented in Monticello

Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of

Application Safety-Related Relays Installed Beyond Their Service Life.

We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be

thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon

as we complete our evaluation.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

cc: Distribution via LISTSERV

EA-15-206

Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF

DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007

Dear Mr. Gardner:

This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),

dated October 2, 2015, that provided a response to our inspection report issued on

September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant.

The letter we received contested a Non-Cited Violation (NCV) documented in Monticello

Inspection Report 2015007. The contested NCV is Failure to Review for Suitability of

Application Safety-Related Relays Installed Beyond Their Service Life.

We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be

thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon

as we complete our evaluation.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

cc: Distribution via LISTSERV

DISTRIBUTION:

See next page

ADAMS Accession Number ML15301A814

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE

RIII

RIII

RIII

RIII

NAME

ADunlop

RSkokowski

CLipa

DATE

10/26/15

10/26/15

10/28/15

OFFICIAL RECORD COPY

Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated October 28, 2015.

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF

DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007

DISTRIBUTION:

Janelle Jessie

RidsNrrDorlLpl3-1 Resource

RidsNrrPMMonticello

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Jim Clay

Carmen Olteanu

ROPreports.Resource@nrc.gov