PLA-7449, Nuclear Property Insurance Program: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 03/31/2016 | | issue date = 03/31/2016 | ||
| title = Nuclear Property Insurance Program | | title = Nuclear Property Insurance Program | ||
| author name = Franke J | | author name = Franke J | ||
| author affiliation = Susquehanna Nuclear, LLC, Talen Energy | | author affiliation = Susquehanna Nuclear, LLC, Talen Energy | ||
| addressee name = | | addressee name = | ||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:MAR 31 Z016 Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Jon.Franke@TalenEnergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM PLA-7449 TALEN-d ENERGY 10 CFR 50.54 Docket Nos. 50-387 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station. Primary NEIL Policy# P16-114 $1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155. | {{#Wiki_filter:MAR 31 Z016 Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Jon.Franke@TalenEnergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM PLA-7449 TALEN-d ENERGY 10 CFR 50.54 Docket Nos. 50-387 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station. | ||
Primary NEIL Policy# P16-114 | |||
$1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155. | |||
This letter contains no new regulatory commitments. | This letter contains no new regulatory commitments. | ||
J. A. Franke Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP MAR 31 Z016 Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Jon.Franke@TalenEnergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM PLA-7449 TALEN-d ENERGY 10 CFR 50.54 Docket Nos. 50-387 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station. Primary NEIL Policy# P16-114 $1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155. | J. A. Franke Copy: | ||
NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP | |||
MAR 31 Z016 Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Jon.Franke@TalenEnergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM PLA-7449 TALEN-d ENERGY 10 CFR 50.54 Docket Nos. 50-387 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station. | |||
Primary NEIL Policy# P16-114 | |||
$1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155. | |||
This letter contains no new regulatory commitments. | This letter contains no new regulatory commitments. | ||
J. A. Franke Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP}} | J. A. Franke Copy: | ||
NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP}} | |||
Latest revision as of 01:49, 10 January 2025
| ML16092A125 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/31/2016 |
| From: | Franke J Susquehanna, Talen Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PLA-7449 | |
| Download: ML16092A125 (1) | |
Text
MAR 31 Z016 Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Jon.Franke@TalenEnergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM PLA-7449 TALEN-d ENERGY 10 CFR 50.54 Docket Nos. 50-387 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station.
Primary NEIL Policy# P16-114
$1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155.
This letter contains no new regulatory commitments.
J. A. Franke Copy:
NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP
MAR 31 Z016 Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Jon.Franke@TalenEnergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM PLA-7449 TALEN-d ENERGY 10 CFR 50.54 Docket Nos. 50-387 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station.
Primary NEIL Policy# P16-114
$1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155.
This letter contains no new regulatory commitments.
J. A. Franke Copy:
NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP