PLA-7449, Nuclear Property Insurance Program: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/31/2016
| issue date = 03/31/2016
| title = Nuclear Property Insurance Program
| title = Nuclear Property Insurance Program
| author name = Franke J A
| author name = Franke J
| author affiliation = Susquehanna Nuclear, LLC, Talen Energy
| author affiliation = Susquehanna Nuclear, LLC, Talen Energy
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:MAR 31 Z016 Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Jon.Franke@TalenEnergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM PLA-7449 TALEN-d ENERGY 10 CFR 50.54 Docket Nos. 50-387 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station. Primary NEIL Policy# P16-114 $1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155.
{{#Wiki_filter:MAR 31 Z016 Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Jon.Franke@TalenEnergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM PLA-7449 TALEN-d ENERGY 10 CFR 50.54 Docket Nos. 50-387 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station.
Primary NEIL Policy# P16-114  
$1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155.
This letter contains no new regulatory commitments.
This letter contains no new regulatory commitments.
J. A. Franke Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP MAR 31 Z016 Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Jon.Franke@TalenEnergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM PLA-7449 TALEN-d ENERGY 10 CFR 50.54 Docket Nos. 50-387 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station. Primary NEIL Policy# P16-114 $1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155.
J. A. Franke Copy:
NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP  
 
MAR 31 Z016 Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Jon.Franke@TalenEnergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM PLA-7449 TALEN-d ENERGY 10 CFR 50.54 Docket Nos. 50-387 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station.
Primary NEIL Policy# P16-114  
$1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155.
This letter contains no new regulatory commitments.
This letter contains no new regulatory commitments.
J. A. Franke Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP}}
J. A. Franke Copy:
NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP}}

Latest revision as of 01:49, 10 January 2025

Nuclear Property Insurance Program
ML16092A125
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/31/2016
From: Franke J
Susquehanna, Talen Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-7449
Download: ML16092A125 (1)


Text

MAR 31 Z016 Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Jon.Franke@TalenEnergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM PLA-7449 TALEN-d ENERGY 10 CFR 50.54 Docket Nos. 50-387 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station.

Primary NEIL Policy# P16-114

$1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155.

This letter contains no new regulatory commitments.

J. A. Franke Copy:

NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP

MAR 31 Z016 Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Jon.Franke@TalenEnergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM PLA-7449 TALEN-d ENERGY 10 CFR 50.54 Docket Nos. 50-387 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station.

Primary NEIL Policy# P16-114

$1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155.

This letter contains no new regulatory commitments.

J. A. Franke Copy:

NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP