{{#Wiki_filter:E. Halpin                                     -1-
{{#Wiki_filter:E. Halpin  
                                            May 9, 2016
- 1 -  
Mr. Edward D. Halpin, Senior Vice President
   and Chief Nuclear Officer
Pacific Gas and Electric Company
May 9, 2016  
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
Mr. Edward D. Halpin, Senior Vice President
SUBJECT:       DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF
   and Chief Nuclear Officer  
                NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016302;
Pacific Gas and Electric Company  
                05000323/2016302
Diablo Canyon Power Plant  
Dear Mr. Halpin:
P.O. Box 56, Mail Code 104/6  
In a conversation on April 7, 2016, between Messrs. R. Fortier, Lead Examination Developer,
Avila Beach, CA 93424  
and M. Bloodgood, Chief Examiner, arrangements were made for the administration of licensing
examinations at Diablo Canyon Power Plant, Units 1 and 2, during the week of October 17,
SUBJECT:  
2016.
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF  
As agreed during the conversation, your staff will prepare the examinations based on the
NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016302;  
guidelines in NUREG-1021, Operator Licensing Examination Standards for Power Reactors,
05000323/2016302  
Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant
Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff
Dear Mr. Halpin:  
any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
In a conversation on April 7, 2016, between Messrs. R. Fortier, Lead Examination Developer,  
outlines by July 15, 2016. The written examinations, operating tests, and supporting reference
and M. Bloodgood, Chief Examiner, arrangements were made for the administration of licensing  
materials identified in Attachment 3 to ES-201 will be due by August 12, 2016. Pursuant to
examinations at Diablo Canyon Power Plant, Units 1 and 2, during the week of October 17,  
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an
2016.  
authorized representative of the facility licensee shall approve the outlines, examinations, and
tests before they are submitted to the NRC for review and approval. All materials shall be
As agreed during the conversation, your staff will prepare the examinations based on the  
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or
guidelines in NUREG-1021, Operator Licensing Examination Standards for Power Reactors,  
safeguards information in your response be contained in a separate enclosure and appropriately
Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant  
marked. Any delay in receiving the required examinations and reference materials, or the
Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff  
submittal of inadequate or incomplete materials, may cause the examinations to be
any changes that might be necessary before the examinations are administered.
rescheduled. In addition, your support for on-site validation of the examinations is required
during the week of September 19, 2016.
To meet the above schedule, it will be necessary for your staff to furnish the examination  
In order to conduct the requested written examinations and operating tests, it will be necessary
outlines by July 15, 2016. The written examinations, operating tests, and supporting reference  
for your staff to provide adequate space and accommodations in accordance with ES-402, and
materials identified in Attachment 3 to ES-201 will be due by August 12, 2016. Pursuant to  
to make the simulation facility available on the dates noted above. In accordance with ES-302,
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an  
your staff should retain the original simulator performance data (e.g., system pressures,
authorized representative of the facility licensee shall approve the outlines, examinations, and  
temperatures, and levels) generated during the dynamic operating tests until the examination
tests before they are submitted to the NRC for review and approval. All materials shall be  
results are final.
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or  
safeguards information in your response be contained in a separate enclosure and appropriately  
marked. Any delay in receiving the required examinations and reference materials, or the  
submittal of inadequate or incomplete materials, may cause the examinations to be  
rescheduled. In addition, your support for on-site validation of the examinations is required  
during the week of September 19, 2016.  
In order to conduct the requested written examinations and operating tests, it will be necessary  
for your staff to provide adequate space and accommodations in accordance with ES-402, and  
to make the simulation facility available on the dates noted above. In accordance with ES-302,  
your staff should retain the original simulator performance data (e.g., system pressures,  
temperatures, and levels) generated during the dynamic operating tests until the examination  
results are final.  


E. Halpin                                       -2-
E. Halpin  
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
- 2 -  
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in  
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
effect while the written examinations and operating tests are being administered.  
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
To permit timely NRC review and evaluation, your staff should submit preliminary operator and  
date, a postponement may be necessary. Signed applications certifying that all training has
senior operator license applications (Office of Management and Budget (OMB) approval  
been completed should be submitted at least 14 days before the first examination date.
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver  
This letter contains information collections that are subject to the Paperwork Reduction Act of
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first  
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
examination date. If the applications are not received at least 30 days before the examination  
approval number 3150-0018, which expires on May 31, 2016. The public reporting burden for
date, a postponement may be necessary. Signed applications certifying that all training has  
this collection of information is estimated to average 50 hours per response, including the time
been completed should be submitted at least 14 days before the first examination date.  
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
This letter contains information collections that are subject to the Paperwork Reduction Act of  
other aspect of these information collections, including suggestions for reducing the burden, to
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under  
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
approval number 3150-0018, which expires on May 31, 2016. The public reporting burden for  
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
this collection of information is estimated to average 50 hours per response, including the time  
INFOCOLLECTS@NRC.GOV.
for reviewing instructions, gathering and maintaining the data needed, and completing and  
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
reviewing the collection of information. Send comments regarding this burden estimate or any  
information collection, unless it displays a currently valid OMB control number.
other aspect of these information collections, including suggestions for reducing the burden, to  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory  
available electronically for public inspection in the NRCs Public Document Room or from the
Commission, Washington, DC 20555-0001, or by Internet electronic mail to  
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
INFOCOLLECTS@NRC.GOV.
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and
information collection, unless it displays a currently valid OMB control number.  
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Bloodgood at 817-200-1544, or myself at
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be  
817-200-1159.
available electronically for public inspection in the NRCs Public Document Room or from the  
                                                  Sincerely,
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access  
                                                  /RA/
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room  
                                                  Vincent G. Gaddy, Chief
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
                                                  Operations Branch
                                                  Division of Reactor Safety
Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and  
Docket Nos. 50-275 and 50-323
guidelines referenced in this letter. If you have any questions regarding the NRCs examination  
License Nos. DPR-80 and DPR-82
procedures and guidelines, please contact Mr. Bloodgood at 817-200-1544, or myself at
cc: Electronic Distribution
817-200-1159.  
Sincerely,
/RA/  
Vincent G. Gaddy, Chief  
Operations Branch  
Division of Reactor Safety  
Docket Nos. 50-275 and 50-323  
License Nos. DPR-80 and DPR-82  
cc: Electronic Distribution  




ML16130A067
  ML16130A067  
  SUNSI Review           ADAMS            Publicly Available      Non-Sensitive  Keyword:
SUNSI Review  
  By: VGaddy                 Yes  No      Non-Publicly Available  Sensitive     RGN-002
By: VGaddy  
  OFFICE         OE:OB     C:OB
ADAMS
  NAME           MBloodgood VGaddy
Yes   No
  SIGNATURE     /RA/       /RA/
Publicly Available
  DATE           5/6/16     5/9/16
  Non-Publicly Available  
                                       
  Non-Sensitive  
Letter to Edward D. Halpin from Vincent G. Gaddy, dated May 9, 2016
Sensitive
SUBJECT:       DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF
Keyword:
              NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016302;
RGN-002  
              05000323/2016302
OFFICE  
Electronic distribution by RIV:
OE:OB  
Regional Administrator (Marc.Dapas@nrc.gov)
C:OB  
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Acting Senior Resident Inspector (John.Reynoso@nrc.gov)
NAME  
Resident Inspector (Michael.Stafford@nrc.gov)
MBloodgood  
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
VGaddy
Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Project Engineer, DRP/A (Matthew.Kirk@nrc.gov)
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
SIGNATURE  
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
/RA/  
RITS Coordinator (Marisa.Herrera@nrc.gov)
/RA/  
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
DATE  
5/6/16  
5/9/16  
 
Letter to Edward D. Halpin from Vincent G. Gaddy, dated May 9, 2016  
SUBJECT:  
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF  
NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016302;  
05000323/2016302  
Electronic distribution by RIV:  
Regional Administrator (Marc.Dapas@nrc.gov)  
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)  
DRP Director (Troy.Pruett@nrc.gov)  
DRP Deputy Director (Ryan.Lantz@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)  
DRS Deputy Director (Jeff.Clark@nrc.gov)  
Acting Senior Resident Inspector (John.Reynoso@nrc.gov)  
Resident Inspector (Michael.Stafford@nrc.gov)
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)  
Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)  
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)  
Project Engineer, DRP/A (Matthew.Kirk@nrc.gov)  
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Project Manager (Balwant.Singal@nrc.gov)  
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)  
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)  
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
}}
}}

Latest revision as of 01:17, 10 January 2025

Notification of NRC Initial Operator Licensing Examination 05000275/2016302; 05000323/2016302
ML16130A067
Person / Time
Site: Diablo Canyon  
(DPR-080, DPR-082)
Issue date: 05/09/2016
From: Vincent Gaddy
Operations Branch IV
To: Halpin E
Pacific Gas & Electric Co
References
Download: ML16130A067 (4)


See also: IR 05000275/2016302

Text

E. Halpin

- 1 -

May 9, 2016

Mr. Edward D. Halpin, Senior Vice President

and Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF

NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016302;

05000323/2016302

Dear Mr. Halpin:

In a conversation on April 7, 2016, between Messrs. R. Fortier, Lead Examination Developer,

and M. Bloodgood, Chief Examiner, arrangements were made for the administration of licensing

examinations at Diablo Canyon Power Plant, Units 1 and 2, during the week of October 17,

2016.

As agreed during the conversation, your staff will prepare the examinations based on the

guidelines in NUREG-1021, Operator Licensing Examination Standards for Power Reactors,

Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant

Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff

any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by July 15, 2016. The written examinations, operating tests, and supporting reference

materials identified in Attachment 3 to ES-201 will be due by August 12, 2016. Pursuant to

Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an

authorized representative of the facility licensee shall approve the outlines, examinations, and

tests before they are submitted to the NRC for review and approval. All materials shall be

complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or

safeguards information in your response be contained in a separate enclosure and appropriately

marked. Any delay in receiving the required examinations and reference materials, or the

submittal of inadequate or incomplete materials, may cause the examinations to be

rescheduled. In addition, your support for on-site validation of the examinations is required

during the week of September 19, 2016.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

E. Halpin

- 2 -

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on May 31, 2016. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Bloodgood at 817-200-1544, or myself at

817-200-1159.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket Nos. 50-275 and 50-323

License Nos. DPR-80 and DPR-82

cc: Electronic Distribution

ML16130A067

SUNSI Review

By: VGaddy

ADAMS

Yes No

Publicly Available

Non-Publicly Available

Non-Sensitive

Sensitive

Keyword:

RGN-002

OFFICE

OE:OB

C:OB

NAME

MBloodgood

VGaddy

SIGNATURE

/RA/

/RA/

DATE

5/6/16

5/9/16

Letter to Edward D. Halpin from Vincent G. Gaddy, dated May 9, 2016

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF

NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016302;

05000323/2016302

Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Acting Senior Resident Inspector (John.Reynoso@nrc.gov)

Resident Inspector (Michael.Stafford@nrc.gov)

Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)

Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer, DRP/A (Matthew.Kirk@nrc.gov)

Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)