{{#Wiki_filter:E. Halpin | {{#Wiki_filter:E. Halpin | ||
- 1 - | |||
Mr. Edward D. Halpin, Senior Vice President | |||
and Chief Nuclear Officer | |||
Pacific Gas and Electric Company | May 9, 2016 | ||
Diablo Canyon Power Plant | |||
P.O. Box 56, Mail Code 104/6 | |||
Avila Beach, CA 93424 | Mr. Edward D. Halpin, Senior Vice President | ||
SUBJECT: | and Chief Nuclear Officer | ||
Pacific Gas and Electric Company | |||
Diablo Canyon Power Plant | |||
Dear Mr. Halpin: | P.O. Box 56, Mail Code 104/6 | ||
In a conversation on April 7, 2016, between Messrs. R. Fortier, Lead Examination Developer, | Avila Beach, CA 93424 | ||
and M. Bloodgood, Chief Examiner, arrangements were made for the administration of licensing | |||
examinations at Diablo Canyon Power Plant, Units 1 and 2, during the week of October 17, | SUBJECT: | ||
2016. | DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF | ||
As agreed during the conversation, your staff will prepare the examinations based on the | NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016302; | ||
guidelines in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, | 05000323/2016302 | ||
Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant | |||
Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff | Dear Mr. Halpin: | ||
any changes that might be necessary before the examinations are administered. | |||
To meet the above schedule, it will be necessary for your staff to furnish the examination | In a conversation on April 7, 2016, between Messrs. R. Fortier, Lead Examination Developer, | ||
outlines by July 15, 2016. The written examinations, operating tests, and supporting reference | and M. Bloodgood, Chief Examiner, arrangements were made for the administration of licensing | ||
materials identified in Attachment 3 to ES-201 will be due by August 12, 2016. Pursuant to | examinations at Diablo Canyon Power Plant, Units 1 and 2, during the week of October 17, | ||
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an | 2016. | ||
authorized representative of the facility licensee shall approve the outlines, examinations, and | |||
tests before they are submitted to the NRC for review and approval. All materials shall be | As agreed during the conversation, your staff will prepare the examinations based on the | ||
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or | guidelines in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, | ||
safeguards information in your response be contained in a separate enclosure and appropriately | Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant | ||
marked. Any delay in receiving the required examinations and reference materials, or the | Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff | ||
submittal of inadequate or incomplete materials, may cause the examinations to be | any changes that might be necessary before the examinations are administered. | ||
rescheduled. In addition, your support for on-site validation of the examinations is required | |||
during the week of September 19, 2016. | To meet the above schedule, it will be necessary for your staff to furnish the examination | ||
In order to conduct the requested written examinations and operating tests, it will be necessary | outlines by July 15, 2016. The written examinations, operating tests, and supporting reference | ||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | materials identified in Attachment 3 to ES-201 will be due by August 12, 2016. Pursuant to | ||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an | ||
your staff should retain the original simulator performance data (e.g., system pressures, | authorized representative of the facility licensee shall approve the outlines, examinations, and | ||
temperatures, and levels) generated during the dynamic operating tests until the examination | tests before they are submitted to the NRC for review and approval. All materials shall be | ||
results are final. | complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or | ||
safeguards information in your response be contained in a separate enclosure and appropriately | |||
marked. Any delay in receiving the required examinations and reference materials, or the | |||
submittal of inadequate or incomplete materials, may cause the examinations to be | |||
rescheduled. In addition, your support for on-site validation of the examinations is required | |||
during the week of September 19, 2016. | |||
In order to conduct the requested written examinations and operating tests, it will be necessary | |||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | |||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | |||
your staff should retain the original simulator performance data (e.g., system pressures, | |||
temperatures, and levels) generated during the dynamic operating tests until the examination | |||
results are final. | |||
E. Halpin | E. Halpin | ||
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in | - 2 - | ||
effect while the written examinations and operating tests are being administered. | |||
To permit timely NRC review and evaluation, your staff should submit preliminary operator and | |||
senior operator license applications (Office of Management and Budget (OMB) approval | Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in | ||
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver | effect while the written examinations and operating tests are being administered. | ||
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first | |||
examination date. If the applications are not received at least 30 days before the examination | To permit timely NRC review and evaluation, your staff should submit preliminary operator and | ||
date, a postponement may be necessary. Signed applications certifying that all training has | senior operator license applications (Office of Management and Budget (OMB) approval | ||
been completed should be submitted at least 14 days before the first examination date. | number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver | ||
This letter contains information collections that are subject to the Paperwork Reduction Act of | requests (if any) (OMB approval number 3150-0090) at least 30 days before the first | ||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | examination date. If the applications are not received at least 30 days before the examination | ||
approval number 3150-0018, which expires on May 31, 2016. The public reporting burden for | date, a postponement may be necessary. Signed applications certifying that all training has | ||
this collection of information is estimated to average 50 hours per response, including the time | been completed should be submitted at least 14 days before the first examination date. | ||
for reviewing instructions, gathering and maintaining the data needed, and completing and | |||
reviewing the collection of information. Send comments regarding this burden estimate or any | This letter contains information collections that are subject to the Paperwork Reduction Act of | ||
other aspect of these information collections, including suggestions for reducing the burden, to | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | ||
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory | approval number 3150-0018, which expires on May 31, 2016. The public reporting burden for | ||
Commission, Washington, DC 20555-0001, or by Internet electronic mail to | this collection of information is estimated to average 50 hours per response, including the time | ||
INFOCOLLECTS@NRC.GOV. | for reviewing instructions, gathering and maintaining the data needed, and completing and | ||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | reviewing the collection of information. Send comments regarding this burden estimate or any | ||
information collection, unless it displays a currently valid OMB control number. | other aspect of these information collections, including suggestions for reducing the burden, to | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory | ||
available electronically for public inspection in the NRCs Public Document Room or from the | Commission, Washington, DC 20555-0001, or by Internet electronic mail to | ||
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access | INFOCOLLECTS@NRC.GOV. | ||
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room | |||
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html. | The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | ||
Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and | information collection, unless it displays a currently valid OMB control number. | ||
guidelines referenced in this letter. If you have any questions regarding the NRCs examination | |||
procedures and guidelines, please contact Mr. Bloodgood at 817-200-1544, or myself at | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | ||
817-200-1159. | available electronically for public inspection in the NRCs Public Document Room or from the | ||
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access | |||
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room | |||
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and | |||
Docket Nos. 50-275 and 50-323 | guidelines referenced in this letter. If you have any questions regarding the NRCs examination | ||
License Nos. DPR-80 and DPR-82 | procedures and guidelines, please contact Mr. Bloodgood at 817-200-1544, or myself at | ||
cc: Electronic Distribution | 817-200-1159. | ||
Sincerely, | |||
/RA/ | |||
Vincent G. Gaddy, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket Nos. 50-275 and 50-323 | |||
License Nos. DPR-80 and DPR-82 | |||
cc: Electronic Distribution | |||
ML16130A067 | |||
SUNSI Review | |||
By: VGaddy | |||
ADAMS | |||
Yes No | |||
Publicly Available | |||
Non-Publicly Available | |||
Non-Sensitive | |||
Letter to Edward D. Halpin from Vincent G. Gaddy, dated May 9, 2016 | Sensitive | ||
SUBJECT: | Keyword: | ||
RGN-002 | |||
OFFICE | |||
Electronic distribution by RIV: | OE:OB | ||
Regional Administrator (Marc.Dapas@nrc.gov) | C:OB | ||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
DRP Director (Troy.Pruett@nrc.gov) | |||
DRP Deputy Director (Ryan.Lantz@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Acting Senior Resident Inspector (John.Reynoso@nrc.gov) | NAME | ||
Resident Inspector (Michael.Stafford@nrc.gov) | MBloodgood | ||
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov) | VGaddy | ||
Branch Chief, DRP/A (Jeremy.Groom@nrc.gov) | |||
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) | |||
Project Engineer, DRP/A (Matthew.Kirk@nrc.gov) | |||
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Project Manager (Balwant.Singal@nrc.gov) | SIGNATURE | ||
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) | /RA/ | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) | /RA/ | ||
ACES (R4Enforcement.Resource@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
DATE | |||
5/6/16 | |||
5/9/16 | |||
Letter to Edward D. Halpin from Vincent G. Gaddy, dated May 9, 2016 | |||
SUBJECT: | |||
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF | |||
NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016302; | |||
05000323/2016302 | |||
Electronic distribution by RIV: | |||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
DRP Director (Troy.Pruett@nrc.gov) | |||
DRP Deputy Director (Ryan.Lantz@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Acting Senior Resident Inspector (John.Reynoso@nrc.gov) | |||
Resident Inspector (Michael.Stafford@nrc.gov) | |||
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov) | |||
Branch Chief, DRP/A (Jeremy.Groom@nrc.gov) | |||
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) | |||
Project Engineer, DRP/A (Matthew.Kirk@nrc.gov) | |||
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Project Manager (Balwant.Singal@nrc.gov) | |||
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) | RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) | ||
}} | }} | ||
Latest revision as of 01:17, 10 January 2025
| ML16130A067 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon (DPR-080, DPR-082) |
| Issue date: | 05/09/2016 |
| From: | Vincent Gaddy Operations Branch IV |
| To: | Halpin E Pacific Gas & Electric Co |
| References | |
| Download: ML16130A067 (4) | |
See also: IR 05000275/2016302
Text
E. Halpin
- 1 -
May 9, 2016
Mr. Edward D. Halpin, Senior Vice President
and Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF
NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016302;
Dear Mr. Halpin:
In a conversation on April 7, 2016, between Messrs. R. Fortier, Lead Examination Developer,
and M. Bloodgood, Chief Examiner, arrangements were made for the administration of licensing
examinations at Diablo Canyon Power Plant, Units 1 and 2, during the week of October 17,
2016.
As agreed during the conversation, your staff will prepare the examinations based on the
guidelines in NUREG-1021, Operator Licensing Examination Standards for Power Reactors,
Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant
Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff
any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by July 15, 2016. The written examinations, operating tests, and supporting reference
materials identified in Attachment 3 to ES-201 will be due by August 12, 2016. Pursuant to
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an
authorized representative of the facility licensee shall approve the outlines, examinations, and
tests before they are submitted to the NRC for review and approval. All materials shall be
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or
safeguards information in your response be contained in a separate enclosure and appropriately
marked. Any delay in receiving the required examinations and reference materials, or the
submittal of inadequate or incomplete materials, may cause the examinations to be
rescheduled. In addition, your support for on-site validation of the examinations is required
during the week of September 19, 2016.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
E. Halpin
- 2 -
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on May 31, 2016. The public reporting burden for
this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Bloodgood at 817-200-1544, or myself at
817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket Nos. 50-275 and 50-323
License Nos. DPR-80 and DPR-82
cc: Electronic Distribution
SUNSI Review
By: VGaddy
Yes No
Publicly Available
Non-Publicly Available
Non-Sensitive
Sensitive
Keyword:
RGN-002
OFFICE
OE:OB
C:OB
NAME
MBloodgood
VGaddy
SIGNATURE
/RA/
/RA/
DATE
5/6/16
5/9/16
Letter to Edward D. Halpin from Vincent G. Gaddy, dated May 9, 2016
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF
NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016302;
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Acting Senior Resident Inspector (John.Reynoso@nrc.gov)
Resident Inspector (Michael.Stafford@nrc.gov)
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Project Engineer, DRP/A (Matthew.Kirk@nrc.gov)
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)