| number = ML16130A564
| number = ML16130A564
| issue date = 05/02/2016
| issue date = 05/02/2016
| title = NRC Regulatory Issue Summary 2015-16 Planned Licensing Action Submittals
| title = Planned Licensing Action Submittals
| author name = Sartain M
| author name = Sartain M
| author affiliation = Dominion Nuclear Connecticut, Inc, Virginia Electric & Power Co (VEPCO)
| author affiliation = Dominion Nuclear Connecticut, Inc, Virginia Electric & Power Co (VEPCO)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Dominion Resources Services, Inc.
{{#Wiki_filter:'*'
Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 May 2, 2016
Dominion Resources Services, Inc.
'*' U. S. Nuclear Regulatory Commission                         Serial No.:  16-023 Attention: Document Control Desk                           NLOS/MLW:    R4 One White Flint North                                       Docket Nos.:  50-336/423 11555 Rockville Pike                                                     50-338/339 Rockville, MD 20852-2738                                                 50-280/281 License Nos.: DPR-65 NPF-49 NPF-4/7 DPR-32/37 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)
Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Serial No.:
NLOS/MLW:
Docket Nos.:
License Nos.:
DOMINION NUCLEAR CONNECTICUT, INC. (DNC)
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE  
MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE  


==SUMMARY==
==SUMMARY==
2015-16 PLANNED LICENSING ACTION SUBMITTALS In response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2015-16, Revision 1, "Planned Licensing Actions Submittals for All Power Reactor Licensees," Attachments 1 through 3 provide the requested information on proposed planned licensing action submittals for the next three calendar years for Millstone (MPS), North Anna (NAPS) and Surry (SPS) Power Stations. Neither DNC nor Dominion currently have power uprates planned in the nextfive years.
2015-16 PLANNED LICENSING ACTION SUBMITTALS 16-023 R4 50-336/423 50-338/339 50-280/281 DPR-65 NPF-49 NPF-4/7 DPR-32/37 In response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2015-16, Revision 1, "Planned Licensing Actions Submittals for All Power Reactor Licensees," Attachments 1 through 3 provide the requested information on proposed planned licensing action submittals for the next three calendar years for Millstone (MPS), North Anna (NAPS) and Surry (SPS) Power Stations. Neither DNC nor Dominion currently have power uprates planned in the nextfive years.
The information in the attachments is being voluntarily provided to assist the NRC in planning for the necessary resources during the budget process.
The information in the attachments is being voluntarily provided to assist the NRC in planning for the necessary resources during the budget process.
Alterations to the planned licensing actions in Attachments 1 through 3 will be communicated to the appropriate NRC Project Managers as they occur.
Alterations to the planned licensing actions in Attachments 1 through 3 will be communicated to the appropriate NRC Project Managers as they occur.
If you have any questions concerning this information, please contact Michael Whitlock at (804) 273-3123.
If you have any questions concerning this information, please contact Michael Whitlock at (804) 273-3123.
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering Dominion Nuclear Connecticut, Inc.
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering Dominion Nuclear Connecticut, Inc.
Virginia Electric and Power Company Attachment 1: Table of Estimated Licensing Actions for Millstone Power Station Attachment 2: Table of Estimated Licensing Actions for North Anna Power Station Attachment 3: Table of Estimated Licensing Actions for Surry Power Station Commitments made in this letter: None
Virginia Electric and Power Company : Table of Estimated Licensing Actions for Millstone Power Station : Table of Estimated Licensing Actions for North Anna Power Station : Table of Estimated Licensing Actions for Surry Power Station Commitments made in this letter: None  


Serial No. 16-023 Docket Nos.: 50-336/423 50-338/339 50-280/281 Page 2 of 2 cc: U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd.
cc:
Suite 100 King of Prussia, Penn~ylvania 19406-2713 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 R. V. Guzman U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 K. R. Cotton-Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station
U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd.
Suite 100 King of Prussia, Penn~ylvania 19406-2713 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 R. V. Guzman U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 K. R. Cotton-Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station Serial No. 16-023 Docket Nos.: 50-336/423 50-338/339 50-280/281 Page 2 of 2


Serial No. 16-023 Docket Nos.: 50-336/423
*./
*./
ATTACHMENT 1 Table of Estimated Licensing Actions for Millstone Power Station MILLSTONE POWER STATION - UNITS 2 & 3 DOMINION NUCLEA.R CONNECTICUT, INC.
ATTACHMENT 1 Serial No. 16-023 Docket Nos.: 50-336/423 Table of Estimated Licensing Actions for Millstone Power Station MILLSTONE POWER STATION - UNITS 2 & 3 DOMINION NUCLEA.R CONNECTICUT, INC.  


Table of Estimated Licensing Actions Millstone Power Station Units 2 and 3 Docket Nos : 50-336/50-423 Can the NRC staff TSTF Number, If                                                               Projected Submittal Outage   Outage Related                           Proprietary Plant Name and Unit Number(*)   Licensing Action Type                               Licensing Action Description/Title                                                         make the lnfonnallon C-ta any                                                                             Date         Related?     Date                               lnfonnatlon public?
Table of Estimated Licensing Actions Millstone Power Station Units 2 and 3 Docket Nos: 50-336/50-423 TSTF Number, If Projected Submittal Outage Outage Related Can the NRC staff Proprietary Plant Name and Unit Number(*)
Millstone Power Station Unit 2 and 3       Relief Request                   Relief Requests RR-04-23 and IR-03-28 to use UT in lieu of RT.       04/2016         Yes       102017             Yes                   No Millstone Power Station Unit 2         License Amendment                               LAR for Large Break LOCA Reanalysis                     05/2016         Yes       402016             Yes                   Yes Millstone Power Station Unit 3             Exemptions                                 Exemption for AXIOM Lead Test Assembly                   07/2016         Yes       402017             Yes                   No LAR to Revise MPS2 TS 3.8.1.1 to add a required ACTION that Millstone Power Station Unit 2        License Amendment                                                                                        09/2016         Yes       402017             Yes                   No would reduce shutdown risk at MPS3. (RSST)
Licensing Action Type Licensing Action Description/Title make the lnfonnallon C-ta any Date Related?
LAR to Add New TS 3/4.7.15 for Main Feedwater Isolation ,
Date public?
Millstone Power Station Unit 3        License Amendment                                                                                        12/2016         No                           Yes                   No Regulating, and Bypass Valves Extension of Type A ILRT Interval to 15 Years. Revise TS for Millstone Power Station Unit 2        License Amendment                                                                                        10/2017         Yes       402018             Yes                   No Containment Leakage Rate Testing Requirements Millstone Power Station Units 2 and 3 License Amendment                               LAR for Electrical Cross-Tie Connection                   2017           No                           Yes                   No LAR for Resolution of Open Phase Condition Bulletin 2012 Millstone Power Station Unit 3         License Amendment       TSTF-556                                                                           2017           No                           Yes                   No Design Vulnerability in electric power system LAR to Revise SR 4.6.2.1.2.b to Increase RBCCW Minimum Millstone Power Station Unit 2          License Amendment                                                                                        2017           No                           Yes                   No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone Power Station Unit 3         License Amendment     TSTF-374             Modify TS requirements for EDG fuel oil testing             2017           No                           Yes                   No Diesel Generator Frequency and Voltage Surveillance Millstone Power Station Units 2 and 3   License Amendment     TSTF-552                                                                           2018           No                           Yes                   No Requirements. WCAP-17308-NP .
lnfonnatlon Millstone Power Station Unit 2 and 3 Relief Request Relief Requests RR-04-23 and IR-03-28 to use UT in lieu of RT.
Measurement Uncertainty Recapture (MUR) - Recovery of a Millstone Power Station Unit 2         License Amendment                     portion of the 2% measurements Uncertainty Required by             2018           No                           Yes                   No Rono   1~1;nnc Delete Item 8 (Containment Water Level Narrow Range) from Millstone Power Station Un it 2        License Amendment                                                                                          2018           No                           Yes                   No Table 3.3-11 of TS 3.3.3.8 Extension of Type A ILRT Interval to 15 Years. Revise TS for Millstone Power Station Unit 3          License Amendment                                                                                        10/2019         Yes       402020             Yes                   No Containment Leakage Rate Testing Requirements Page 1of1
04/2016 Yes 102017 Yes No Millstone Power Station Unit 2 License Amendment LAR for Large Break LOCA Reanalysis 05/2016 Yes 402016 Yes Yes Millstone Power Station Unit 3 Exemptions Exemption for AXIOM Lead Test Assembly 07/2016 Yes 402017 Yes No Millstone Power Station Unit 2 License Amendment LAR to Revise MPS2 TS 3.8.1.1 to add a required ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown risk at MPS3. (RSST)
Millstone Power Station Unit 3 License Amendment LAR to Add New TS 3/4.7.15 for Main Feedwater Isolation, 12/2016 No Yes No Regulating, and Bypass Valves Millstone Power Station Unit 2 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2017 Yes 402018 Yes No Containment Leakage Rate Testing Requirements Millstone Power Station Units 2 and 3 License Amendment LAR for Electrical Cross-Tie Connection 2017 No Yes No Millstone Power Station Unit 3 License Amendment TSTF-556 LAR for Resolution of Open Phase Condition Bulletin 2012 2017 No Yes No Design Vulnerability in electric power system Millstone Power Station Unit 2 License Amendment LAR to Revise SR 4.6.2.1.2.b to Increase RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone Power Station Unit 3 License Amendment TSTF-374 Modify TS requirements for EDG fuel oil testing 2017 No Yes No Millstone Power Station Units 2 and 3 License Amendment TSTF-552 Diesel Generator Frequency and Voltage Surveillance 2018 No Yes No Requirements. WCAP-17308-NP.
Measurement Uncertainty Recapture (MUR) - Recovery of a Millstone Power Station Unit 2 License Amendment portion of the 2% measurements Uncertainty Required by 2018 No Yes No Rono 1~1;nnc Millstone Power Station Unit 2 License Amendment Delete Item 8 (Containment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Millstone Power Station Unit 3 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2019 Yes 402020 Yes No Containment Leakage Rate Testing Requirements Page 1of1  


Serial No. 16-023 Docket Nos.: 50-338/339 ATTACHMENT 2 Table of Estimated Licensing Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
ATTACHMENT 2 Serial No. 16-023 Docket Nos.: 50-338/339 Table of Estimated Licensing Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)  


Table of Estimated Licensing Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339 Can the NRC staff Licensing Action                                                                Projected Submittal  Outage    Outage                                            Proprietary Plant Name and Unit Number(s)                         TSTF Number, If any    Licensing Action Description/Title                                                make the lnfonnatlon      Comments Type                                                                              Date        Related? Related Data                                          Information public? Yes or No EAL Revision - Fuel clad degradation and North Anna Power Station, Units 1 and 2 License Amendment                                                                      07/2016          No                        Yes                                  No fuel clad barrier loss North Anna Power Station , Units 1 and 2 License Amendment                     ISFSI License Renewal (for Pad 1 TN-32)           05/2016          No                        Yes                                  No Fuel Independent SBLOCA Analysis (TS                                                                       Supports compliance North Anna Power Station, Units 1 and 2  License Amendment                                                                      08/2016          No                        Yes                                  Yes Reference Change/COLR Mod)                                                                                with 10CFR50.46(c)
Table of Estimated Licensing Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339 Plant Name and Unit Number(s)
Revision to Spent Fuel Criticality Analysis North Anna Power Station, Units 1 and 2  License Amendment                    - updated fuel design w/ 5% fuel                 09/2016          No                        Ye s                                Yes enrichment LAR for PAD 5.0 and FSLOCA [Large                                                                         Supports compliance North Anna Power Station, Units 1 and 2  License Amendment                                                                        2018            No                        Yes                                  Yes Break]                                                                                                     with 10CFR50.46(c)
North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request Relief Request Relief Request License Amendment License Amendment TSTF Number, If any TSTF-522 Licensing Action Description/Title EAL Revision - Fuel clad degradation and fuel clad barrier loss ISFSI License Renewal (for Pad 1 TN-32)
Adds Open Phase Condition (OPC)                                         2nd Otr 2018 Isolation System operability and                                         (NAPS1)
Fuel Independent SBLOCA Analysis (TS Reference Change/COLR Mod)
North Anna Power Station, Units 1 and 2  License Amendment                                                                      01/2017        Yes                        Yes                                  No surveillance requirements for mitigation of                             4th Otr 2020 an OPC                                                                   (NAPS2)
Revision to Spent Fuel Criticality Analysis  
Revise the Environmental Protection Plan North Anna Power Station , Units 1 and 2 License Amendment                                                                        2017            No                        Yes                                  No to Correct CFR References Revise the surveillance requirements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR Filters to operate them for greater than or equal to 15 minutes.
- updated fuel design w/ 5% fuel enrichment LAR for PAD 5.0 and FSLOCA [Large Break]
North Anna Power Station, Units 1 and 2  License Amendment      TSTF-522      Revise TS 5.5.10 to incorporate the               09/2016          No                        Yes                                  No requirements of Regulatory Guide 1.52, revision 3, which requires In-Place Filter Testing/Laboratory Testing to be extended to 24 months.
Adds Open Phase Condition (OPC)
Second Period Limited Examination Relief North Anna Power Station , Unit 1          Relief Request                                                                        2017          No                        Yes                                  No Request - N1-14-LMT-002 Request to extend the reactor vessel weld examinations by ten years. The PWR North Anna Power Station, Units 1 and 2    Relief Request                      Owner's Group analysis by Westinghouse           07/2016        Yes      102018            Yes                                  No has already been started. N1-14-NDE-008 I N2-14-NDE-003 North Anna Unit 1 Fifth Interval ISi North Anna Power Station, Unit 1            Relief Request                                                                        2018          Yes      302019            Yes                                  No Program Relief Requests LAR to rely on off-site EMT's rather than North Anna Power Station , Units 1 and 2 License Amendment                                                                        2017          No                        Yes                                  No on-site EMT's LAR to move the Local Emergency North Anna Power Station, Units 1 and 2  License Amendment                      Operations Facility (LEOF) to an EOF               2017          No                        Yes                                  No located at Innsbrook Page 1of1
Isolation System operability and surveillance requirements for mitigation of an OPC Revise the Environmental Protection Plan to Correct CFR References Revise the surveillance requirements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR Filters to operate them for greater than or equal to 15 minutes.
Revise TS 5.5.10 to incorporate the requirements of Regulatory Guide 1.52, revision 3, which requires In-Place Filter Testing/Laboratory Testing to be extended to 24 months.
Second Period Limited Examination Relief Request - N1-14-LMT-002 Request to extend the reactor vessel weld examinations by ten years. The PWR Owner's Group analysis by Westinghouse has already been started. N1-14-NDE-008 I N2-14-NDE-003 North Anna Unit 1 Fifth Interval ISi Program Relief Requests LAR to rely on off-site EMT's rather than on-site EMT's LAR to move the Local Emergency Operations Facility (LEOF) to an EOF located at Innsbrook Page 1of1 Projected Submittal Outage Outage Can the NRC staff Proprietary make the lnfonnatlon Comments Date Related?
Related Data public? Yes or No Information 07/2016 No Yes No 05/2016 No Yes No 08/2016 No Yes Supports compliance Yes with 10CFR50.46(c) 09/2016 No Yes Yes 2018 No Yes Supports compliance Yes with 10CFR50.46(c) 2nd Otr 2018 01/2017 Yes (NAPS1)
Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Yes No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No


Serial No. 16-023 Docket Nos. : 50-280/281 ATTACHMENT 3 Table of Estimated Licensing Actions for Surry Power Station SURRY POWER STATION- UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
ATTACHMENT 3 Serial No. 16-023 Docket Nos.: 50-280/281 Table of Estimated Licensing Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)  


Table of Estimated Licensing Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281 Can the NRC staff Projected Submittal  Outage  Outage Related                                    Proprietary Plant Name and Unit Number(*) Licensing Action Type TSTF Number, If any     Licensing Action Description/Title                                                               make the Information Comments Date         Related?        Date                                      Information public? Yea or No Alternate monitoring of rod position with one Surry Power Station Units 1 and 2  License Amendment    TSTF-547        inoperable rod position indicator                         05/2016          No                                Yes                        No Revises Residual Heat Removal (RHR) and Surry Power Station Units 1 and 2  License Amendment                    Component Cooling (CC) Systems' TS                       05/2016         No                                Yes                        No Requirements and adds an RHR Surveillance Revises the Fuel Cladding Barrier Degradation and Surry Power Station Units 1 and 2  License Amendment                    Loss Emergency Action Level Thresholds                   06/2016          No                                Yes                        No Extends the Charging Pump Service Water and Surry Power Station Units 1 and 2  License Amendment                    MCR/ESGR AC Subsystems Flowpath Allowed                   05/2016         No                                Yes                        No Outage Time from 24 to 72 hrs Expands the Primary Grade (PG) Water Lockout TS Surry Power Station Units 1 and 2  License Amendment                    Requirements                                              05/2016         No                                Yes                        No Extends the Emergency Service Water Pump Surry Power Station Units 1 and 2 License Amendment                    Allowed Outage Time from 7 to 14 days 06/2016          No                                Yes                        No Adds Open Phase Condition (OPC) Isolation Surry Power Station Units 1 and 2 License Amendment                    System operability and surveillance requirements         01 /2017       Yes    2nd Qtr 2018 (SPS1 )        Yes                        No for mitigation of an OPC                                                         4th Qtr 2018 (S PS2)
Table of Estimated Licensing Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281 Plant Name and Unit Number(*)
Revises RCS Activity Limits and Dose Surry Power Station Units 1 and 2 License Amendment                    Consequences for FHA, SGTR, MSLB and LRA 06/2016          No                                Yes                        No TS change to extend ACT to permit replacement of Surry Power Station Units 1 and 2 License Amendment                    the Reserve Statio n Service Transformer C and and       03/2017         Yes                                Yes                        No cable/bus replacement                                                               3rd Qtr 2018 ISi Alternative Request to permit use of CFRP Surry Power Station Units 1 and 2    Relief Request                    application in buried safety related SW Piping as         07/2016         Yes                                Yes                        No pressure boundary                                                                 2nd Qtr 2017 Administrative change deletes temporary/one-time Surry Power Station Units 1 and 2 License Amendment                    TS AOTs/Requirements for previously completed             08/2016         No                                Yes                        No chilled water pipe replacement project, and other Surry Power Station Units 1 and 2 License Amendment                    Revised UFSAR Dose Analyses                               09/2016         No                                Yes                        No Surry Power Station Units 1 and 2 License Amendment                    Fuel Independent SBLOCA Analysis                         09/2016         No                                Yes                      Yes Topical Report DOM-NAF-2 Appendix E (AGORA Surry Power Station Units 1 and 2 License Amendment                    CHF Correlation) 12/2016          No                                Yes                      TBD Surry Power Station Units 1 and 2 License Amendment                    RLBLOCA for Vendor Qualification Program                 04/2017         No                                Yes                      TBD Surry Power Station Units 1 and 2 License Amendment                    AGORA Vendor Qualification Program Submittal             04/201 7         No                                Yes                      TBD Surry Power Station Units 1 and 2 License Amendment                    Spent Fuel Poot Criticality Analysis                       2018           No                                Yes                      Yes Surry Power Station Units 1 and 2 License Amendment                    Full Spectrum LOCA Analysis                                 2018           No                                Yes                      Yes Relocation of Leak Testing of Miscellaneous Surry Power Station Units 1 and 2  License Amendment                    Rad ioactive Materail s to TRM 2018          No                                Yes                        No LAR to rely on off-site EMrs rather than on-site Surry Power Station Units 1 and 2  License Amendment                    EMrs 2017          No                                Yes                        No LAR to move the Local Emergency Operations Surry Power Station Units 1 and 2  License Amendment                    Facility (LEOF) to an EOF located at Innsbrook             2017           No                                 Yes                       No Page 1of1}}
Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment TSTF Number, If any TSTF-547 Projected Submittal Licensing Action Description/Title Date Alternate monitoring of rod position with one 05/2016 inoperable rod position indicator Revises Residual Heat Removal (RHR) and Component Cooling (CC) Systems' TS 05/2016 Requirements and adds an RHR Surveillance Revises the Fuel Cladding Barrier Degradation and 06/2016 Loss Emergency Action Level Thresholds Extends the Charging Pump Service Water and MCR/ESGR AC Subsystems Flowpath Allowed 05/2016 Outage Time from 24 to 72 hrs Expands the Primary Grade (PG) Water Lockout TS 05/2016 Requirements Extends the Emergency Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition (OPC) Isolation System operability and surveillance requirements 01/2017 for mitigation of an OPC Revises RCS Activity Limits and Dose 06/2016 Consequences for FHA, SGTR, MSLB and LRA TS change to extend ACT to permit replacement of the Reserve Station Service Transformer C and and 03/2017 cable/bus replacement ISi Alternative Request to permit use of CFRP application in buried safety related SW Piping as 07/2016 pressure boundary Administrative change deletes temporary/one-time TS AOTs/Requirements for previously completed 08/2016 chilled water pipe replacement project, and other Revised UFSAR Dose Analyses 09/2016 Fuel Independent SBLOCA Analysis 09/2016 Topical Report DOM-NAF-2 Appendix E (AGORA 12/2016 CHF Correlation)
RLBLOCA for Vendor Qualification Program 04/2017 AGORA Vendor Qualification Program Submittal 04/201 7 Spent Fuel Poot Criticality Analysis 2018 Full Spectrum LOCA Analysis 2018 Relocation of Leak Testing of Miscellaneous 2018 Radioactive Materails to TRM LAR to rely on off-site EMrs rather than on-site 2017 EMrs LAR to move the Local Emergency Operations 2017 Facility (LEOF) to an EOF located at Innsbrook Page 1of1 Outage Outage Related Can the NRC staff Proprietary make the Information Comments Related?
Date public? Yea or No Information No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1 )
Yes No 4th Qtr 2018 (SPS2)
No Yes No Yes Yes No 3rd Qtr 2018 Yes Yes No 2nd Qtr 2017 No Yes No No Yes No No Yes Yes No Yes TBD No Yes TBD No Yes TBD No Yes Yes No Yes Yes No Yes No No Yes No No Yes No}}

Latest revision as of 00:13, 10 January 2025

Planned Licensing Action Submittals
ML16130A564
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 05/02/2016
From: Mark D. Sartain
Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-15-016, SN 16-023
Download: ML16130A564 (8)


Text

'*'

Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Serial No.:

NLOS/MLW:

Docket Nos.:

License Nos.:

DOMINION NUCLEAR CONNECTICUT, INC. (DNC)

VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE

SUMMARY

2015-16 PLANNED LICENSING ACTION SUBMITTALS16-023 R4 50-336/423 50-338/339 50-280/281 DPR-65 NPF-49 NPF-4/7 DPR-32/37 In response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2015-16, Revision 1, "Planned Licensing Actions Submittals for All Power Reactor Licensees," Attachments 1 through 3 provide the requested information on proposed planned licensing action submittals for the next three calendar years for Millstone (MPS), North Anna (NAPS) and Surry (SPS) Power Stations. Neither DNC nor Dominion currently have power uprates planned in the nextfive years.

The information in the attachments is being voluntarily provided to assist the NRC in planning for the necessary resources during the budget process.

Alterations to the planned licensing actions in Attachments 1 through 3 will be communicated to the appropriate NRC Project Managers as they occur.

If you have any questions concerning this information, please contact Michael Whitlock at (804) 273-3123.

Sincerely, Mark D. Sartain Vice President - Nuclear Engineering Dominion Nuclear Connecticut, Inc.

Virginia Electric and Power Company : Table of Estimated Licensing Actions for Millstone Power Station : Table of Estimated Licensing Actions for North Anna Power Station : Table of Estimated Licensing Actions for Surry Power Station Commitments made in this letter: None

cc:

U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd.

Suite 100 King of Prussia, Penn~ylvania 19406-2713 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 R. V. Guzman U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 K. R. Cotton-Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station Serial No.16-023 Docket Nos.: 50-336/423 50-338/339 50-280/281 Page 2 of 2

  • ./

ATTACHMENT 1 Serial No.16-023 Docket Nos.: 50-336/423 Table of Estimated Licensing Actions for Millstone Power Station MILLSTONE POWER STATION - UNITS 2 & 3 DOMINION NUCLEA.R CONNECTICUT, INC.

Table of Estimated Licensing Actions Millstone Power Station Units 2 and 3 Docket Nos: 50-336/50-423 TSTF Number, If Projected Submittal Outage Outage Related Can the NRC staff Proprietary Plant Name and Unit Number(*)

Licensing Action Type Licensing Action Description/Title make the lnfonnallon C-ta any Date Related?

Date public?

lnfonnatlon Millstone Power Station Unit 2 and 3 Relief Request Relief Requests RR-04-23 and IR-03-28 to use UT in lieu of RT.

04/2016 Yes 102017 Yes No Millstone Power Station Unit 2 License Amendment LAR for Large Break LOCA Reanalysis 05/2016 Yes 402016 Yes Yes Millstone Power Station Unit 3 Exemptions Exemption for AXIOM Lead Test Assembly 07/2016 Yes 402017 Yes No Millstone Power Station Unit 2 License Amendment LAR to Revise MPS2 TS 3.8.1.1 to add a required ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown risk at MPS3. (RSST)

Millstone Power Station Unit 3 License Amendment LAR to Add New TS 3/4.7.15 for Main Feedwater Isolation, 12/2016 No Yes No Regulating, and Bypass Valves Millstone Power Station Unit 2 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2017 Yes 402018 Yes No Containment Leakage Rate Testing Requirements Millstone Power Station Units 2 and 3 License Amendment LAR for Electrical Cross-Tie Connection 2017 No Yes No Millstone Power Station Unit 3 License Amendment TSTF-556 LAR for Resolution of Open Phase Condition Bulletin 2012 2017 No Yes No Design Vulnerability in electric power system Millstone Power Station Unit 2 License Amendment LAR to Revise SR 4.6.2.1.2.b to Increase RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone Power Station Unit 3 License Amendment TSTF-374 Modify TS requirements for EDG fuel oil testing 2017 No Yes No Millstone Power Station Units 2 and 3 License Amendment TSTF-552 Diesel Generator Frequency and Voltage Surveillance 2018 No Yes No Requirements. WCAP-17308-NP.

Measurement Uncertainty Recapture (MUR) - Recovery of a Millstone Power Station Unit 2 License Amendment portion of the 2% measurements Uncertainty Required by 2018 No Yes No Rono 1~1;nnc Millstone Power Station Unit 2 License Amendment Delete Item 8 (Containment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Millstone Power Station Unit 3 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2019 Yes 402020 Yes No Containment Leakage Rate Testing Requirements Page 1of1

ATTACHMENT 2 Serial No.16-023 Docket Nos.: 50-338/339 Table of Estimated Licensing Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

Table of Estimated Licensing Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339 Plant Name and Unit Number(s)

North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request Relief Request Relief Request License Amendment License Amendment TSTF Number, If any TSTF-522 Licensing Action Description/Title EAL Revision - Fuel clad degradation and fuel clad barrier loss ISFSI License Renewal (for Pad 1 TN-32)

Fuel Independent SBLOCA Analysis (TS Reference Change/COLR Mod)

Revision to Spent Fuel Criticality Analysis

- updated fuel design w/ 5% fuel enrichment LAR for PAD 5.0 and FSLOCA [Large Break]

Adds Open Phase Condition (OPC)

Isolation System operability and surveillance requirements for mitigation of an OPC Revise the Environmental Protection Plan to Correct CFR References Revise the surveillance requirements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR Filters to operate them for greater than or equal to 15 minutes.

Revise TS 5.5.10 to incorporate the requirements of Regulatory Guide 1.52, revision 3, which requires In-Place Filter Testing/Laboratory Testing to be extended to 24 months.

Second Period Limited Examination Relief Request - N1-14-LMT-002 Request to extend the reactor vessel weld examinations by ten years. The PWR Owner's Group analysis by Westinghouse has already been started. N1-14-NDE-008 I N2-14-NDE-003 North Anna Unit 1 Fifth Interval ISi Program Relief Requests LAR to rely on off-site EMT's rather than on-site EMT's LAR to move the Local Emergency Operations Facility (LEOF) to an EOF located at Innsbrook Page 1of1 Projected Submittal Outage Outage Can the NRC staff Proprietary make the lnfonnatlon Comments Date Related?

Related Data public? Yes or No Information 07/2016 No Yes No 05/2016 No Yes No 08/2016 No Yes Supports compliance Yes with 10CFR50.46(c) 09/2016 No Yes Yes 2018 No Yes Supports compliance Yes with 10CFR50.46(c) 2nd Otr 2018 01/2017 Yes (NAPS1)

Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Yes No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No

ATTACHMENT 3 Serial No.16-023 Docket Nos.: 50-280/281 Table of Estimated Licensing Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

Table of Estimated Licensing Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281 Plant Name and Unit Number(*)

Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment TSTF Number, If any TSTF-547 Projected Submittal Licensing Action Description/Title Date Alternate monitoring of rod position with one 05/2016 inoperable rod position indicator Revises Residual Heat Removal (RHR) and Component Cooling (CC) Systems' TS 05/2016 Requirements and adds an RHR Surveillance Revises the Fuel Cladding Barrier Degradation and 06/2016 Loss Emergency Action Level Thresholds Extends the Charging Pump Service Water and MCR/ESGR AC Subsystems Flowpath Allowed 05/2016 Outage Time from 24 to 72 hrs Expands the Primary Grade (PG) Water Lockout TS 05/2016 Requirements Extends the Emergency Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition (OPC) Isolation System operability and surveillance requirements 01/2017 for mitigation of an OPC Revises RCS Activity Limits and Dose 06/2016 Consequences for FHA, SGTR, MSLB and LRA TS change to extend ACT to permit replacement of the Reserve Station Service Transformer C and and 03/2017 cable/bus replacement ISi Alternative Request to permit use of CFRP application in buried safety related SW Piping as 07/2016 pressure boundary Administrative change deletes temporary/one-time TS AOTs/Requirements for previously completed 08/2016 chilled water pipe replacement project, and other Revised UFSAR Dose Analyses 09/2016 Fuel Independent SBLOCA Analysis 09/2016 Topical Report DOM-NAF-2 Appendix E (AGORA 12/2016 CHF Correlation)

RLBLOCA for Vendor Qualification Program 04/2017 AGORA Vendor Qualification Program Submittal 04/201 7 Spent Fuel Poot Criticality Analysis 2018 Full Spectrum LOCA Analysis 2018 Relocation of Leak Testing of Miscellaneous 2018 Radioactive Materails to TRM LAR to rely on off-site EMrs rather than on-site 2017 EMrs LAR to move the Local Emergency Operations 2017 Facility (LEOF) to an EOF located at Innsbrook Page 1of1 Outage Outage Related Can the NRC staff Proprietary make the Information Comments Related?

Date public? Yea or No Information No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1 )

Yes No 4th Qtr 2018 (SPS2)

No Yes No Yes Yes No 3rd Qtr 2018 Yes Yes No 2nd Qtr 2017 No Yes No No Yes No No Yes Yes No Yes TBD No Yes TBD No Yes TBD No Yes Yes No Yes Yes No Yes No No Yes No No Yes No