| number = ML16130A564
| number = ML16130A564
| issue date = 05/02/2016
| issue date = 05/02/2016
| title = North Anna, Units 1 & 2, and Surry, Units 1 & 2, NRC Regulatory Issue Summary 2015-16 Planned Licensing Action Submittals
| title = Planned Licensing Action Submittals
| author name = Sartain M D
| author name = Sartain M
| author affiliation = Dominion Nuclear Connecticut, Inc, Virginia Electric & Power Co (VEPCO)
| author affiliation = Dominion Nuclear Connecticut, Inc, Virginia Electric & Power Co (VEPCO)
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 8
| page count = 8
}}
}}
See also: [[followed by::RIS 2015-16]]


=Text=
=Text=
{{#Wiki_filter:'*' Dominion Resources  
{{#Wiki_filter:'*'
Services, Inc. Innsbrook  
Dominion Resources Services, Inc.
Technical  
Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Serial No.:
Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory  
NLOS/MLW:
Commission  
Docket Nos.:
Attention:  
License Nos.:
Document Control Desk One White Flint North 11555 Rockville  
DOMINION NUCLEAR CONNECTICUT, INC. (DNC)
Pike Rockville, MD 20852-2738  
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
Serial No.: NLOS/MLW:  
MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE
Docket Nos.: License Nos.: DOMINION NUCLEAR CONNECTICUT, INC. (DNC) VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)  
 
MILLSTONE  
==SUMMARY==
POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY  
2015-16 PLANNED LICENSING ACTION SUBMITTALS 16-023 R4 50-336/423 50-338/339 50-280/281 DPR-65 NPF-49 NPF-4/7 DPR-32/37 In response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2015-16, Revision 1, "Planned Licensing Actions Submittals for All Power Reactor Licensees," Attachments 1 through 3 provide the requested information on proposed planned licensing action submittals for the next three calendar years for Millstone (MPS), North Anna (NAPS) and Surry (SPS) Power Stations. Neither DNC nor Dominion currently have power uprates planned in the nextfive years.
ISSUE SUMMARY 2015-16 PLANNED LICENSING  
The information in the attachments is being voluntarily provided to assist the NRC in planning for the necessary resources during the budget process.
ACTION SUBMITTALS  
Alterations to the planned licensing actions in Attachments 1 through 3 will be communicated to the appropriate NRC Project Managers as they occur.
16-023 R4 50-336/423  
If you have any questions concerning this information, please contact Michael Whitlock at (804) 273-3123.
50-338/339  
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering Dominion Nuclear Connecticut, Inc.
50-280/281  
Virginia Electric and Power Company : Table of Estimated Licensing Actions for Millstone Power Station : Table of Estimated Licensing Actions for North Anna Power Station : Table of Estimated Licensing Actions for Surry Power Station Commitments made in this letter: None  
DPR-65 NPF-49 NPF-4/7 DPR-32/37  
 
In response to Nuclear Regulatory  
cc:
Commission (NRC) Regulatory  
U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd.
Issue Summary 2015-16, Revision 1, "Planned Licensing  
Suite 100 King of Prussia, Penn~ylvania 19406-2713 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 R. V. Guzman U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 K. R. Cotton-Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station Serial No. 16-023 Docket Nos.: 50-336/423 50-338/339 50-280/281 Page 2 of 2  
Actions Submittals  
 
for All Power Reactor Licensees," Attachments  
*./
1 through 3 provide the requested  
ATTACHMENT 1 Serial No. 16-023 Docket Nos.: 50-336/423 Table of Estimated Licensing Actions for Millstone Power Station MILLSTONE POWER STATION - UNITS 2 & 3 DOMINION NUCLEA.R CONNECTICUT, INC.  
information  
 
on proposed planned licensing  
Table of Estimated Licensing Actions Millstone Power Station Units 2 and 3 Docket Nos: 50-336/50-423 TSTF Number, If Projected Submittal Outage Outage Related Can the NRC staff Proprietary Plant Name and Unit Number(*)
action submittals  
Licensing Action Type Licensing Action Description/Title make the lnfonnallon C-ta any Date Related?
for the next three calendar years for Millstone (MPS), North Anna (NAPS) and Surry (SPS) Power Stations.  
Date public?
Neither DNC nor Dominion currently  
lnfonnatlon Millstone Power Station Unit 2 and 3 Relief Request Relief Requests RR-04-23 and IR-03-28 to use UT in lieu of RT.
have power uprates planned in the nextfive years. The information  
04/2016 Yes 102017 Yes No Millstone Power Station Unit 2 License Amendment LAR for Large Break LOCA Reanalysis 05/2016 Yes 402016 Yes Yes Millstone Power Station Unit 3 Exemptions Exemption for AXIOM Lead Test Assembly 07/2016 Yes 402017 Yes No Millstone Power Station Unit 2 License Amendment LAR to Revise MPS2 TS 3.8.1.1 to add a required ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown risk at MPS3. (RSST)
in the attachments  
Millstone Power Station Unit 3 License Amendment LAR to Add New TS 3/4.7.15 for Main Feedwater Isolation, 12/2016 No Yes No Regulating, and Bypass Valves Millstone Power Station Unit 2 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2017 Yes 402018 Yes No Containment Leakage Rate Testing Requirements Millstone Power Station Units 2 and 3 License Amendment LAR for Electrical Cross-Tie Connection 2017 No Yes No Millstone Power Station Unit 3 License Amendment TSTF-556 LAR for Resolution of Open Phase Condition Bulletin 2012 2017 No Yes No Design Vulnerability in electric power system Millstone Power Station Unit 2 License Amendment LAR to Revise SR 4.6.2.1.2.b to Increase RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone Power Station Unit 3 License Amendment TSTF-374 Modify TS requirements for EDG fuel oil testing 2017 No Yes No Millstone Power Station Units 2 and 3 License Amendment TSTF-552 Diesel Generator Frequency and Voltage Surveillance 2018 No Yes No Requirements. WCAP-17308-NP.
is being voluntarily  
Measurement Uncertainty Recapture (MUR) - Recovery of a Millstone Power Station Unit 2 License Amendment portion of the 2% measurements Uncertainty Required by 2018 No Yes No Rono 1~1;nnc Millstone Power Station Unit 2 License Amendment Delete Item 8 (Containment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Millstone Power Station Unit 3 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2019 Yes 402020 Yes No Containment Leakage Rate Testing Requirements Page 1of1  
provided to assist the NRC in planning for the necessary  
 
resources  
ATTACHMENT 2 Serial No. 16-023 Docket Nos.: 50-338/339 Table of Estimated Licensing Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)  
during the budget process. Alterations  
 
to the planned licensing  
Table of Estimated Licensing Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339 Plant Name and Unit Number(s)
actions in Attachments  
North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request Relief Request Relief Request License Amendment License Amendment TSTF Number, If any TSTF-522 Licensing Action Description/Title EAL Revision - Fuel clad degradation and fuel clad barrier loss ISFSI License Renewal (for Pad 1 TN-32)
1 through 3 will be communicated  
Fuel Independent SBLOCA Analysis (TS Reference Change/COLR Mod)
to the appropriate  
Revision to Spent Fuel Criticality Analysis
NRC Project Managers as they occur. If you have any questions  
- updated fuel design w/ 5% fuel enrichment LAR for PAD 5.0 and FSLOCA [Large Break]
concerning  
Adds Open Phase Condition (OPC)
this information, please contact Michael Whitlock at (804) 273-3123.  
Isolation System operability and surveillance requirements for mitigation of an OPC Revise the Environmental Protection Plan to Correct CFR References Revise the surveillance requirements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR Filters to operate them for greater than or equal to 15 minutes.
Sincerely, Mark D. Sartain Vice President  
Revise TS 5.5.10 to incorporate the requirements of Regulatory Guide 1.52, revision 3, which requires In-Place Filter Testing/Laboratory Testing to be extended to 24 months.
-Nuclear Engineering  
Second Period Limited Examination Relief Request - N1-14-LMT-002 Request to extend the reactor vessel weld examinations by ten years. The PWR Owner's Group analysis by Westinghouse has already been started. N1-14-NDE-008 I N2-14-NDE-003 North Anna Unit 1 Fifth Interval ISi Program Relief Requests LAR to rely on off-site EMT's rather than on-site EMT's LAR to move the Local Emergency Operations Facility (LEOF) to an EOF located at Innsbrook Page 1of1 Projected Submittal Outage Outage Can the NRC staff Proprietary make the lnfonnatlon Comments Date Related?
Dominion Nuclear Connecticut, Inc. Virginia Electric and Power Company Attachment
Related Data public? Yes or No Information 07/2016 No Yes No 05/2016 No Yes No 08/2016 No Yes Supports compliance Yes with 10CFR50.46(c) 09/2016 No Yes Yes 2018 No Yes Supports compliance Yes with 10CFR50.46(c) 2nd Otr 2018 01/2017 Yes (NAPS1)
1: Table of Estimated  
Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Yes No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No  
Licensing  
 
Actions for Millstone  
ATTACHMENT 3 Serial No. 16-023 Docket Nos.: 50-280/281 Table of Estimated Licensing Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)  
Power Station Attachment
 
2: Table of Estimated  
Table of Estimated Licensing Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281 Plant Name and Unit Number(*)
Licensing  
Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment TSTF Number, If any TSTF-547 Projected Submittal Licensing Action Description/Title Date Alternate monitoring of rod position with one 05/2016 inoperable rod position indicator Revises Residual Heat Removal (RHR) and Component Cooling (CC) Systems' TS 05/2016 Requirements and adds an RHR Surveillance Revises the Fuel Cladding Barrier Degradation and 06/2016 Loss Emergency Action Level Thresholds Extends the Charging Pump Service Water and MCR/ESGR AC Subsystems Flowpath Allowed 05/2016 Outage Time from 24 to 72 hrs Expands the Primary Grade (PG) Water Lockout TS 05/2016 Requirements Extends the Emergency Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition (OPC) Isolation System operability and surveillance requirements 01/2017 for mitigation of an OPC Revises RCS Activity Limits and Dose 06/2016 Consequences for FHA, SGTR, MSLB and LRA TS change to extend ACT to permit replacement of the Reserve Station Service Transformer C and and 03/2017 cable/bus replacement ISi Alternative Request to permit use of CFRP application in buried safety related SW Piping as 07/2016 pressure boundary Administrative change deletes temporary/one-time TS AOTs/Requirements for previously completed 08/2016 chilled water pipe replacement project, and other Revised UFSAR Dose Analyses 09/2016 Fuel Independent SBLOCA Analysis 09/2016 Topical Report DOM-NAF-2 Appendix E (AGORA 12/2016 CHF Correlation)
Actions for North Anna Power Station Attachment
RLBLOCA for Vendor Qualification Program 04/2017 AGORA Vendor Qualification Program Submittal 04/201 7 Spent Fuel Poot Criticality Analysis 2018 Full Spectrum LOCA Analysis 2018 Relocation of Leak Testing of Miscellaneous 2018 Radioactive Materails to TRM LAR to rely on off-site EMrs rather than on-site 2017 EMrs LAR to move the Local Emergency Operations 2017 Facility (LEOF) to an EOF located at Innsbrook Page 1of1 Outage Outage Related Can the NRC staff Proprietary make the Information Comments Related?
3: Table of Estimated  
Date public? Yea or No Information No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1 )
Licensing  
Yes No 4th Qtr 2018 (SPS2)
Actions for Surry Power Station Commitments  
No Yes No Yes Yes No 3rd Qtr 2018 Yes Yes No 2nd Qtr 2017 No Yes No No Yes No No Yes Yes No Yes TBD No Yes TBD No Yes TBD No Yes Yes No Yes Yes No Yes No No Yes No No Yes No}}
made in this letter: None
cc: U. S. Nuclear Regulatory  
Commission  
Region I 2100 Renaissance  
Blvd. Suite 100 King of Prussia,  
19406-2713  
U. S. Nuclear Regulatory  
Commission  
Region II Marquis One Tower 245 Peachtree  
Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257  
R. V. Guzman U.S. Nuclear Regulatory  
Commission  
One White Flint North Mail Stop 08 C-2 11555 Rockville  
Pike Rockville, MD 20852-2738  
K. R. Cotton-Gross  
U.S. Nuclear Regulatory  
Commission  
One White Flint North Mail Stop 08 G-9A 11555 Rockville  
Pike Rockville, MD 20852-2738  
Dr. V. Sreenivas  
U. S. Nuclear Regulatory  
Commission  
One White Flint North Mail Stop 08 G-9A 11555 Rockville  
Pike Rockville, MD 20852-2738  
NRC Senior Resident Inspector  
Millstone  
Power Station NRC Senior Resident Inspector  
North Anna Power Station NRC Senior Resident Inspector  
Surry Power Station Serial No. 16-023 Docket Nos.: 50-336/423  
50-338/339  
50-280/281  
Page 2 of 2
*./ ATTACHMENT  
1 Serial No. 16-023 Docket Nos.: 50-336/423  
Table of Estimated  
Licensing  
Actions for Millstone  
Power Station MILLSTONE  
POWER STATION -UNITS 2 & 3 DOMINION NUCLEA.R CONNECTICUT, INC.
Table of Estimated  
Licensing  
Actions Millstone  
Power Station Units 2 and 3 Docket Nos: 50-336/50-423  
TSTF Number , If Projected  
Submittal  
Outage Outage Related Can the NRC staff Proprietary  
Plant Name and Unit Number(*)  
Licensing  
Action Type Licensing  
Action Description/Title  
make the lnfonnallon  
C-ta any Date Related? Date public? lnfonnatlon  
Millstone  
Power Station Unit 2 and 3 Relief Request Relief Requests RR-04-23 and IR-03-28 to use UT in lieu of RT. 04/2016 Yes 102017 Yes No Millstone  
Power Station Unit 2 License Amendment  
LAR for Large Break LOCA Reanalysis  
05/2016 Yes 402016 Yes Yes Millstone  
Power Station Unit 3 Exemptions  
Exemption  
for AXIOM Lead Test Assembly 07/2016 Yes 402017 Yes No Millstone  
Power Station Unit 2 License Amendment  
LAR to Revise MPS2 TS 3.8.1.1 to add a required ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown risk at MPS3. (RSST) Mill s tone Power Station Unit 3 Licen se Amendment  
LAR to Add New TS 3/4.7.15 for Main Feedwater  
Isolation , 12/2016 No Yes No Regulating, and Bypas s Valves Millstone  
Power Sta tion Un it 2 License Amendment  
Extension  
of Type A ILRT Interval to 15 Years. Rev ise TS for 10/2017 Yes 402018 Yes No Containment  
Leakage Rate Testi ng Requirements  
Millstone  
Power Station Units 2 and 3 License Amendment  
LAR for Electrical  
Cross-Tie Connection  
2017 No Yes No Millstone  
Power Station Un it 3 License Amendment  
TSTF-556 LAR for Resolution  
of Open Phase Condition  
Bulletin 2012-01 -2017 No Yes No Design Vulnerability  
in electric power system Millstone  
Power Station Un it 2 License Amendment  
LAR to Revise SR 4.6.2.1.2.b to Increase RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone  
Power Station Unit 3 License Amendment  
TSTF-3 74 Modify TS requirements  
for EDG fuel oil testing 2017 No Yes No Millstone  
Power Station Units 2 and 3 Licen se Amendment  
TSTF-552 Diesel Generator  
Frequency  
and Voltage Surveillance  
2018 No Yes No Requirements. WCAP-17308-NP. Measurement  
Uncertainty  
Recapture (MUR) -Recovery of a Millston e Power Station Unit 2 License Amendment  
portion of the 2% measurements  
Uncertainty  
Required by 2018 No Yes No Rono  
Millstone  
Power Station Un it 2 License Amendment  
Delete Item 8 (Cont ainment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Mill sto ne Power Station Unit 3 License Amendment  
Extens ion of Type A ILRT I nterval to 15 Years. Revise TS for 1 0/2019 Yes 402020 Yes No Containment  
Leakage Rate Testing Requirements  
Page 1of1
ATTACHMENT  
2 Serial No. 16-023 Docket Nos.: 50-338/339  
Table of Estimated  
Licensing  
Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS  
1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
Table of Estimated  
Licensing  
Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339  
Plant Name and Unit Number(s)  
North Anna Powe r Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Unit 1 North Anna Power Station , Un i ts 1 and 2 North A nna Power Station , Unit 1 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 Licensing  
Action Type License Amendment  
License Amendment  
License Amendment  
License Amendment  
License Amendment  
License Amendment  
Li cense Amendment  
Lice n se Amendment  
Re l ief Request Relief Request Relief Request License Amendment  
License Amendment  
TSTF Number, If any TSTF-522 Licensing  
Action Description/Title  
EAL Revision -Fuel clad degradation  
and fue l clad barrier l oss ISFSI License Renewal (f or Pad 1 TN-32) Fuel Independent  
SBLOCA Analysis (TS Reference  
Change/COLR Mod) Revision to Spent Fuel Criticality  
Analysis -updated fuel design w/ 5% fuel enrichment  
LAR for PAD 5.0 and FSLOCA [Large Brea k] Adds Open Phase Condition (O P C) Isolat ion System operab i lity and surveillance  
requireme nts for mitigation  
of an OPC Revise the Environmental  
Protection  
Plan to Correct CFR References  
Revise the surveillance  
requ i rements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR Filters to operate them for greater than or equal to 15 minutes. Revise TS 5.5.10 to inco rporate the requirements  
of Regulatory  
Guide 1.52 , revision 3 , which requires In-Place Filter Testing/Laboratory  
Testing to be extended to 24 months. Second Period Limited E xa mination Relief Request -N1-14-LMT-002  
Request to extend the reactor vesse l weld examinations  
by ten years. The PWR Owner's Group analysis by Westinghouse  
has already been started. N1-14-NDE-008  
I N2-14-NDE-003  
North Anna Unit 1 Fifth Interval ISi Program Relief Requests LAR to rely on off-site EMT's rather than on-site EMT's LAR to move the Local Emergency  
Operations  
Facility (LEOF) to an EOF located at Innsbrook  
Page 1of1 Projected  
Submittal  
Outage Outage Can the NRC staff Proprietary  
make the lnfonnatlon  
Comments Date Related? Related Data public? Yes or No Information  
07/2 016 No Yes No 05/2016 No Yes No 08/2 016 No Yes Supports comp lia nce Yes with 10CFR50.46(c) 09/2016 No Ye s Yes 2018 No Yes Supports compliance  
Yes with 10CFR50.46(c)  
2nd Otr 2018 01/2017 Yes (NAPS1) Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Ye s No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No
ATTACHMENT  
3 Serial No. 16-023 Docket Nos.: 50-280/281  
Table of Estimated  
Licensing  
Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
Table of Estimated  
Licensing  
Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281  
Plant Name and Unit Number(*)  
Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un it s 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un its 1 and 2 Surry Power Station Units 1 and 2 S urry Power Station Units 1 and 2 Surry Power Stat io n Units 1 and 2 Surry Power Station Un i ts 1 and 2 Surry Power Station Un i ts 1 and 2 Surry Power Stat i on Un i ts 1 and 2 Surry Power Stat io n Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un its 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un its 1 and 2 Surry Power Station Units 1 and 2 Licensing  
Action Type License Amendment  
License Amendme n t License Amendment  
License A m endment License Amendment  
License Amendment  
License Amendment  
License Amendment  
License Amendment  
Rel i ef Request License Amendment  
License Amendment  
License Ame ndm ent License Amendment  
License Ame ndm ent License Amendment  
License Amendment  
License Amendment  
License Amendment  
License Amendment  
License Amendment  
TSTF Number, If any TSTF-547 Projected  
Submittal  
Licensing  
Action Description/Title  
Date Alternate  
monitoring  
of rod position with one 05/2016 in operable rod position indicator  
Revises Residual Heat Removal (RHR) and Com p onent Cooling (CC) Systems' TS 05/2016 Requirements  
and adds an RHR Surveillance  
Re vises the Fue l Cladd i ng Barrier Degradation  
and 06/2016 Loss Emergency  
Action Le vel Thresholds  
Extends the Charging Pump Service Wa t er and MCR/ESGR AC Subsystems  
Flowpath Allowed 05/2016 Outage T i me from 24 to 72 hrs E xpands the Primary Grade (PG) Water Lo ckout TS 05/2016 Requirements  
Extends the Emergency  
Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition  
(OPC) Isolation  
System operability  
and surveillance  
requ ireme nts 01/2017 for m i t i gat ion of an OPC Revises RCS Activity Limits and Dose 06/2016 Consequences  
for FHA , SGTR, MSLB and L RA TS change to extend ACT to permit replacement  
of the Reserve St at io n Service Transformer  
C and and 03/2017 cable/bu s replacement  
ISi Alternative  
Req uest to perm it use of CFRP application  
i n buried safety re l ated SW Pip i ng as 07/2016 pressure boundary Administrati
ve change de l etes temporary/one-time TS AOTs/Requirements  
for previously  
completed  
08/2 016 chilled water pipe replacement  
project , and other Rev ise d UFSAR Dose Analyses 09/2016 Fuel I ndependen t S BLOC A A na lysis 09/2016 Topical Report DOM-NAF-2 Appendix E (A GORA 12/2016 CHF Correlation) RLBL OCA for Vend or Qualification  
Program 04/2017 AGORA Vendor Qualificat
i on Program Submitta l 04/201 7 Spent Fuel Poot Criticality  
An alys i s 2018 Full Spectrum LOCA An a lysis 2018 R elocation
of L eak Tes ting of Misce llan eous 2018 Rad ioactive Matera il s to TRM LAR to rely on off-s i te EMrs rather than on-site 2017 EM rs LAR to m ove the Local Emergen cy O pera tions 2017 Facili ty (LEOF) to an EOF located at Innsbrook  
Page 1of1 Outage Outage Related Can the NRC staff Proprietary  
make the Information  
Comments Related? Date public? Yea or No Information  
No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1) Yes No 4th Qtr 2018 (S PS2) No Yes No Yes Yes No 3rd Qtr 2018 Yes Yes No 2nd Qtr 2017 No Yes No No Yes No No Yes Yes No Yes TBD No Yes TBD No Yes TBD No Yes Y es No Yes Yes No Yes No No Yes No No Yes No
}}

Latest revision as of 00:13, 10 January 2025

Planned Licensing Action Submittals
ML16130A564
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 05/02/2016
From: Mark D. Sartain
Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-15-016, SN 16-023
Download: ML16130A564 (8)


Text

'*'

Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Serial No.:

NLOS/MLW:

Docket Nos.:

License Nos.:

DOMINION NUCLEAR CONNECTICUT, INC. (DNC)

VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE

SUMMARY

2015-16 PLANNED LICENSING ACTION SUBMITTALS16-023 R4 50-336/423 50-338/339 50-280/281 DPR-65 NPF-49 NPF-4/7 DPR-32/37 In response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2015-16, Revision 1, "Planned Licensing Actions Submittals for All Power Reactor Licensees," Attachments 1 through 3 provide the requested information on proposed planned licensing action submittals for the next three calendar years for Millstone (MPS), North Anna (NAPS) and Surry (SPS) Power Stations. Neither DNC nor Dominion currently have power uprates planned in the nextfive years.

The information in the attachments is being voluntarily provided to assist the NRC in planning for the necessary resources during the budget process.

Alterations to the planned licensing actions in Attachments 1 through 3 will be communicated to the appropriate NRC Project Managers as they occur.

If you have any questions concerning this information, please contact Michael Whitlock at (804) 273-3123.

Sincerely, Mark D. Sartain Vice President - Nuclear Engineering Dominion Nuclear Connecticut, Inc.

Virginia Electric and Power Company : Table of Estimated Licensing Actions for Millstone Power Station : Table of Estimated Licensing Actions for North Anna Power Station : Table of Estimated Licensing Actions for Surry Power Station Commitments made in this letter: None

cc:

U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd.

Suite 100 King of Prussia, Penn~ylvania 19406-2713 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 R. V. Guzman U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 K. R. Cotton-Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station Serial No.16-023 Docket Nos.: 50-336/423 50-338/339 50-280/281 Page 2 of 2

  • ./

ATTACHMENT 1 Serial No.16-023 Docket Nos.: 50-336/423 Table of Estimated Licensing Actions for Millstone Power Station MILLSTONE POWER STATION - UNITS 2 & 3 DOMINION NUCLEA.R CONNECTICUT, INC.

Table of Estimated Licensing Actions Millstone Power Station Units 2 and 3 Docket Nos: 50-336/50-423 TSTF Number, If Projected Submittal Outage Outage Related Can the NRC staff Proprietary Plant Name and Unit Number(*)

Licensing Action Type Licensing Action Description/Title make the lnfonnallon C-ta any Date Related?

Date public?

lnfonnatlon Millstone Power Station Unit 2 and 3 Relief Request Relief Requests RR-04-23 and IR-03-28 to use UT in lieu of RT.

04/2016 Yes 102017 Yes No Millstone Power Station Unit 2 License Amendment LAR for Large Break LOCA Reanalysis 05/2016 Yes 402016 Yes Yes Millstone Power Station Unit 3 Exemptions Exemption for AXIOM Lead Test Assembly 07/2016 Yes 402017 Yes No Millstone Power Station Unit 2 License Amendment LAR to Revise MPS2 TS 3.8.1.1 to add a required ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown risk at MPS3. (RSST)

Millstone Power Station Unit 3 License Amendment LAR to Add New TS 3/4.7.15 for Main Feedwater Isolation, 12/2016 No Yes No Regulating, and Bypass Valves Millstone Power Station Unit 2 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2017 Yes 402018 Yes No Containment Leakage Rate Testing Requirements Millstone Power Station Units 2 and 3 License Amendment LAR for Electrical Cross-Tie Connection 2017 No Yes No Millstone Power Station Unit 3 License Amendment TSTF-556 LAR for Resolution of Open Phase Condition Bulletin 2012 2017 No Yes No Design Vulnerability in electric power system Millstone Power Station Unit 2 License Amendment LAR to Revise SR 4.6.2.1.2.b to Increase RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone Power Station Unit 3 License Amendment TSTF-374 Modify TS requirements for EDG fuel oil testing 2017 No Yes No Millstone Power Station Units 2 and 3 License Amendment TSTF-552 Diesel Generator Frequency and Voltage Surveillance 2018 No Yes No Requirements. WCAP-17308-NP.

Measurement Uncertainty Recapture (MUR) - Recovery of a Millstone Power Station Unit 2 License Amendment portion of the 2% measurements Uncertainty Required by 2018 No Yes No Rono 1~1;nnc Millstone Power Station Unit 2 License Amendment Delete Item 8 (Containment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Millstone Power Station Unit 3 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2019 Yes 402020 Yes No Containment Leakage Rate Testing Requirements Page 1of1

ATTACHMENT 2 Serial No.16-023 Docket Nos.: 50-338/339 Table of Estimated Licensing Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

Table of Estimated Licensing Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339 Plant Name and Unit Number(s)

North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request Relief Request Relief Request License Amendment License Amendment TSTF Number, If any TSTF-522 Licensing Action Description/Title EAL Revision - Fuel clad degradation and fuel clad barrier loss ISFSI License Renewal (for Pad 1 TN-32)

Fuel Independent SBLOCA Analysis (TS Reference Change/COLR Mod)

Revision to Spent Fuel Criticality Analysis

- updated fuel design w/ 5% fuel enrichment LAR for PAD 5.0 and FSLOCA [Large Break]

Adds Open Phase Condition (OPC)

Isolation System operability and surveillance requirements for mitigation of an OPC Revise the Environmental Protection Plan to Correct CFR References Revise the surveillance requirements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR Filters to operate them for greater than or equal to 15 minutes.

Revise TS 5.5.10 to incorporate the requirements of Regulatory Guide 1.52, revision 3, which requires In-Place Filter Testing/Laboratory Testing to be extended to 24 months.

Second Period Limited Examination Relief Request - N1-14-LMT-002 Request to extend the reactor vessel weld examinations by ten years. The PWR Owner's Group analysis by Westinghouse has already been started. N1-14-NDE-008 I N2-14-NDE-003 North Anna Unit 1 Fifth Interval ISi Program Relief Requests LAR to rely on off-site EMT's rather than on-site EMT's LAR to move the Local Emergency Operations Facility (LEOF) to an EOF located at Innsbrook Page 1of1 Projected Submittal Outage Outage Can the NRC staff Proprietary make the lnfonnatlon Comments Date Related?

Related Data public? Yes or No Information 07/2016 No Yes No 05/2016 No Yes No 08/2016 No Yes Supports compliance Yes with 10CFR50.46(c) 09/2016 No Yes Yes 2018 No Yes Supports compliance Yes with 10CFR50.46(c) 2nd Otr 2018 01/2017 Yes (NAPS1)

Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Yes No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No

ATTACHMENT 3 Serial No.16-023 Docket Nos.: 50-280/281 Table of Estimated Licensing Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

Table of Estimated Licensing Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281 Plant Name and Unit Number(*)

Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment TSTF Number, If any TSTF-547 Projected Submittal Licensing Action Description/Title Date Alternate monitoring of rod position with one 05/2016 inoperable rod position indicator Revises Residual Heat Removal (RHR) and Component Cooling (CC) Systems' TS 05/2016 Requirements and adds an RHR Surveillance Revises the Fuel Cladding Barrier Degradation and 06/2016 Loss Emergency Action Level Thresholds Extends the Charging Pump Service Water and MCR/ESGR AC Subsystems Flowpath Allowed 05/2016 Outage Time from 24 to 72 hrs Expands the Primary Grade (PG) Water Lockout TS 05/2016 Requirements Extends the Emergency Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition (OPC) Isolation System operability and surveillance requirements 01/2017 for mitigation of an OPC Revises RCS Activity Limits and Dose 06/2016 Consequences for FHA, SGTR, MSLB and LRA TS change to extend ACT to permit replacement of the Reserve Station Service Transformer C and and 03/2017 cable/bus replacement ISi Alternative Request to permit use of CFRP application in buried safety related SW Piping as 07/2016 pressure boundary Administrative change deletes temporary/one-time TS AOTs/Requirements for previously completed 08/2016 chilled water pipe replacement project, and other Revised UFSAR Dose Analyses 09/2016 Fuel Independent SBLOCA Analysis 09/2016 Topical Report DOM-NAF-2 Appendix E (AGORA 12/2016 CHF Correlation)

RLBLOCA for Vendor Qualification Program 04/2017 AGORA Vendor Qualification Program Submittal 04/201 7 Spent Fuel Poot Criticality Analysis 2018 Full Spectrum LOCA Analysis 2018 Relocation of Leak Testing of Miscellaneous 2018 Radioactive Materails to TRM LAR to rely on off-site EMrs rather than on-site 2017 EMrs LAR to move the Local Emergency Operations 2017 Facility (LEOF) to an EOF located at Innsbrook Page 1of1 Outage Outage Related Can the NRC staff Proprietary make the Information Comments Related?

Date public? Yea or No Information No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1 )

Yes No 4th Qtr 2018 (SPS2)

No Yes No Yes Yes No 3rd Qtr 2018 Yes Yes No 2nd Qtr 2017 No Yes No No Yes No No Yes Yes No Yes TBD No Yes TBD No Yes TBD No Yes Yes No Yes Yes No Yes No No Yes No No Yes No