ML16272A079: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Regulatory Guide Periodic Review Regulatory Guide Number: | {{#Wiki_filter:Enclosure 1 Regulatory Guide Periodic Review Regulatory Guide Number: 5.20 Revision Number: | ||
0 | |||
==Title:== | ==Title:== | ||
Training, Equipping, and Qualifying of Guards and Watchmen Office: | Training, Equipping, and Qualifying of Guards and Watchmen Office: | ||
: 1. | NSIR/DSP Technical Lead: | ||
Al Tardiff Recommended Staff Action: Withdraw | |||
: 1. | |||
What are the known technical or regulatory issues with the current version of the Regulatory Guide (RG)? | |||
This 1974 document is dated in numerous technical and regulatory areas, including references to outdated regulations. | This 1974 document is dated in numerous technical and regulatory areas, including references to outdated regulations. | ||
: 2. | : 2. | ||
What is the impact on internal and external stakeholders of not updating the RG for the known issues, in terms of anticipated numbers of licensing and inspection activities over the next several years? | |||
The staff does not expect any new licensing actions relevant to this guide in the next several years and current licensees may continue to use RG 5.20. The staff does not anticipate any impact on not updating the RG at this point. In addition, updated guidance can be found in RG 5.75, Training and Qualification of Security Personnel at Nuclear Power Reactor Facilities. | The staff does not expect any new licensing actions relevant to this guide in the next several years and current licensees may continue to use RG 5.20. The staff does not anticipate any impact on not updating the RG at this point. In addition, updated guidance can be found in RG 5.75, Training and Qualification of Security Personnel at Nuclear Power Reactor Facilities. | ||
: 3. | : 3. | ||
What is an estimate of the level of effort needed to address identified issues in terms of full-time equivalent (FTE) and contractor resources? | |||
Approximately 0.01 full-time equivalency (FTE) will be required to complete the withdrawal. | Approximately 0.01 full-time equivalency (FTE) will be required to complete the withdrawal. | ||
: 4. | : 4. | ||
Based on the answers to the questions above, what is the staff action for this guide (Reviewed with no issues identified, Reviewed with issues identified for future consideration, Revise, or Withdraw)? | |||
The staff recommends this guide to be withdrawn. | The staff recommends this guide to be withdrawn. | ||
: 5. | : 5. | ||
Provide a conceptual plan and timeframe to address the issues identified during the review. | |||
The staff plans to withdraw this document by the end of fiscal year 2017. | The staff plans to withdraw this document by the end of fiscal year 2017. | ||
Note: This review was conducted in October 2016 and reflects the staffs plans as of that date. These plans are tentative and subject to change. | Note: This review was conducted in October 2016 and reflects the staffs plans as of that date. These plans are tentative and subject to change.}} | ||
Latest revision as of 20:07, 9 January 2025
| ML16272A079 | |
| Person / Time | |
|---|---|
| Issue date: | 10/21/2016 |
| From: | Galloway M Division of Security Policy |
| To: | Bernard Thomas Division of Engineering |
| Held W | |
| Shared Package | |
| ML16272A044 | List: |
| References | |
| Download: ML16272A079 (1) | |
Text
Enclosure 1 Regulatory Guide Periodic Review Regulatory Guide Number: 5.20 Revision Number:
0
Title:
Training, Equipping, and Qualifying of Guards and Watchmen Office:
NSIR/DSP Technical Lead:
Al Tardiff Recommended Staff Action: Withdraw
- 1.
What are the known technical or regulatory issues with the current version of the Regulatory Guide (RG)?
This 1974 document is dated in numerous technical and regulatory areas, including references to outdated regulations.
- 2.
What is the impact on internal and external stakeholders of not updating the RG for the known issues, in terms of anticipated numbers of licensing and inspection activities over the next several years?
The staff does not expect any new licensing actions relevant to this guide in the next several years and current licensees may continue to use RG 5.20. The staff does not anticipate any impact on not updating the RG at this point. In addition, updated guidance can be found in RG 5.75, Training and Qualification of Security Personnel at Nuclear Power Reactor Facilities.
- 3.
What is an estimate of the level of effort needed to address identified issues in terms of full-time equivalent (FTE) and contractor resources?
Approximately 0.01 full-time equivalency (FTE) will be required to complete the withdrawal.
- 4.
Based on the answers to the questions above, what is the staff action for this guide (Reviewed with no issues identified, Reviewed with issues identified for future consideration, Revise, or Withdraw)?
The staff recommends this guide to be withdrawn.
- 5.
Provide a conceptual plan and timeframe to address the issues identified during the review.
The staff plans to withdraw this document by the end of fiscal year 2017.
Note: This review was conducted in October 2016 and reflects the staffs plans as of that date. These plans are tentative and subject to change.