ML17279A442: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 2: Line 2:
| number = ML17279A442
| number = ML17279A442
| issue date = 07/15/1987
| issue date = 07/15/1987
| title = Confirms 870709 Conversation W/R Pate Requesting Extension to 870715 Deadline Imposed by 870625 Ltr Re Investigation of Allegations.Util Will Provide Final Rept of Conclusions & Actions Taken or to Be Taken
| title = Confirms 870709 Conversation W/R Pate Requesting Extension to 870715 Deadline Imposed by Re Investigation of Allegations.Util Will Provide Final Rept of Conclusions & Actions Taken or to Be Taken
| author name = Sorensen G
| author name = Sorensen G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ULA     INFORNATION DIST     JTIO   YSTEN (RIDS)
{{#Wiki_filter:ACCESSION NBR'AC IL: 50-39.7 AUTH. MANE SORENSENs G. C.
ACCESSION            8708110350       DQC. DATE: 87/07/15     NOTARIZED: NO         DOCKET IL: 50-39.7              Nuclear Progecti Unit 2i Washington Public       Powe 050003'P7 NBR'AC WPPSS AUTH. MANE                AUTHOR AFFILIATION SORENSENs G. C.            Washington Public Power Supply System RECIP. MANE                RECIPIENT AFFILIATION KIRSCHs D. F.              Region 5i Office of Director
RECIP. MANE KIRSCHs D. F.
ULA INFORNATION DIST JTIO YSTEN (RIDS) 8708110350 DQC. DATE: 87/07/15 NOTARIZED:
NO DOCKET WPPSS Nuclear Progecti Unit 2i Washington Public Powe 050003'P7 AUTHOR AFFILIATION Washington Public Power Supply System RECIPIENT AFFILIATION Region 5i Office of Director


==SUBJECT:==
==SUBJECT:==
Confirms 870709 conversation w/R Pate requesting extension to 870715 deadline imposed bg 870625           ltr re investigation of allegations. Util will provide final rept of conclusions 8c actions taken or to be taken.
Confirms 870709 conversation w/R Pate requesting extension to 870715 deadline imposed bg 870625 ltr re investigation of allegations. Util will provide final rept of conclusions 8c actions taken or to be taken.
DISTRIBUTION CODE:           IE28D   COPIES RECEIVED: LTR   l ENCL ~ SIZE:
DISTRIBUTION CODE:
TITLE: Correspondence           to IE: Dist to Recipient> Filesi     PDRi etc.
IE28D COPIES RECEIVED: LTR l ENCL ~
SIZE:
TITLE: Correspondence to IE: Dist to Recipient>
Filesi PDRi etc.
NOTES:
NOTES:
REC IP IENT       COP IEB          REC IP IENT        COP IEB ID CODE/NAME        LTTR ENCL      ID CODE/NAME       LTTR ENCL KIRSCHi D. F.
REC IP IENT ID CODE/NAME KIRSCHi D. F.
INTERNAL'EOD/DQA                                     AEOD/DSP/TPAB NRR/P NAB/ILRB                                           02 RES/DE/EIH EXTERNAL: LPDR                                       NRC PDR NSIC TOTAL NUMBER OF COPIES REQUIRED: LTTR               9   ENCL
INTERNAL'EOD/DQA NRR/P NAB/ILRB RES/DE/EIH COP IEB LTTR ENCL REC IP IENT ID CODE/NAME AEOD/DSP/TPAB 02 COP IEB LTTR ENCL EXTERNAL:
LPDR NSIC NRC PDR TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL


  ~ ~   0 ~
~
n
~
'1
0
~
'1 n


            ~                           ai         ~
~
WASHINGTON PUBLIC POWER SUPPLY SYS'IIÃEIVED P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washin ton 99352 REGION V 87081i0350 870715 PDR  ADQCK    05000397 PDR July 15, 1987 Mr. Dennis F. Kirsch, Director Division of Reactor Safety & Projects U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596
ai
~
WASHINGTON PUBLIC POWER SUPPLY SYS'IIÃEIVED P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washin ton 99352 REGION V July 15, 1987 Mr. Dennis F. Kirsch, Director Division of Reactor Safety
& Projects U.S. Nuclear Regulatory Commission Region V
1450 Maria Lane, Suite 210 Walnut Creek, CA 94596


==Dear Mr. Kirsch:==
==Dear Mr. Kirsch:==
==Subject:==
==Subject:==
INVESTIGATION OF ALLEGATIONS
INVESTIGATION OF ALLEGATIONS 87081i0350 870715 PDR ADQCK 05000397 PDR


==Reference:==
==Reference:==
Letter,   DF Kirsch to DW Mazur, same subject, dated June 25, 1987 This letter is to     confirm   my conversation with Mr. Robert Pate of your office   on July 9,   1987 wherein I requested an   extension to the July 15, 1987 deadline   imposed by the above referenced     letter.
: Letter, DF Kirsch to DW Mazur, same subject, dated June 25, 1987 This letter is to confirm my conversation with Mr. Robert Pate of your office on July 9, 1987 wherein I requested an extension to the July 15, 1987 deadline imposed by the above referenced letter.
Your letter   was not received by the Washington Public Power Supply System until July 7,   1987 which     eliminated twelve days of the allotted time.
Your letter was not received by the Washington Public Power Supply System until July 7, 1987 which eliminated twelve days of the allotted time.
The complexities that this type of investigation may produce would in themselves make     it necessary for us to request more than the allotted 20 days to complete the investigation.
The complexities that this type of investigation may produce would in themselves make it necessary for us to request more than the allotted 20 days to complete the investigation.
To date, we have assigned a two-man investigative team to look into the subject allegations. We are unable at this time to provide a schedule for completion, not knowing the impact of the allegations. Therefore, we will provide your office with periodic updates concerning the investigation as we have information to report.
To date, we have assigned a two-man investigative team to look into the subject allegations.
Upon completion of the investigation, the Washington Public Power Supply System   will provide a final report of our conclusions and actions taken or to be taken.
We are unable at this time to provide a schedule for completion, not knowing the impact of the allegations.
Very truly your   ,
Therefore, we will provide your office with periodic updates concerning the investigation as we have information to report.
G. C. Sorensen, Manager Regulatory Programs
Upon completion of the investigation, the Washington Public Power Supply System will provide a final report of our conclusions and actions taken or to be taken.
Very truly your G.
C. Sorensen, Manager Regulatory Programs


0 ~           4- ~ ~
0
~
4- ~ ~
II I
II I
e
e
              ,r f
,r f
t 1}}
t 1}}

Latest revision as of 06:34, 8 January 2025

Confirms 870709 Conversation W/R Pate Requesting Extension to 870715 Deadline Imposed by Re Investigation of Allegations.Util Will Provide Final Rept of Conclusions & Actions Taken or to Be Taken
ML17279A442
Person / Time
Site: Columbia 
Issue date: 07/15/1987
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 8708110350
Download: ML17279A442 (4)


Text

ACCESSION NBR'AC IL: 50-39.7 AUTH. MANE SORENSENs G. C.

RECIP. MANE KIRSCHs D. F.

ULA INFORNATION DIST JTIO YSTEN (RIDS) 8708110350 DQC. DATE: 87/07/15 NOTARIZED:

NO DOCKET WPPSS Nuclear Progecti Unit 2i Washington Public Powe 050003'P7 AUTHOR AFFILIATION Washington Public Power Supply System RECIPIENT AFFILIATION Region 5i Office of Director

SUBJECT:

Confirms 870709 conversation w/R Pate requesting extension to 870715 deadline imposed bg 870625 ltr re investigation of allegations. Util will provide final rept of conclusions 8c actions taken or to be taken.

DISTRIBUTION CODE:

IE28D COPIES RECEIVED: LTR l ENCL ~

SIZE:

TITLE: Correspondence to IE: Dist to Recipient>

Filesi PDRi etc.

NOTES:

REC IP IENT ID CODE/NAME KIRSCHi D. F.

INTERNAL'EOD/DQA NRR/P NAB/ILRB RES/DE/EIH COP IEB LTTR ENCL REC IP IENT ID CODE/NAME AEOD/DSP/TPAB 02 COP IEB LTTR ENCL EXTERNAL:

LPDR NSIC NRC PDR TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL

~

~

0

~

'1 n

~

ai

~

WASHINGTON PUBLIC POWER SUPPLY SYS'IIÃEIVED P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washin ton 99352 REGION V July 15, 1987 Mr. Dennis F. Kirsch, Director Division of Reactor Safety

& Projects U.S. Nuclear Regulatory Commission Region V

1450 Maria Lane, Suite 210 Walnut Creek, CA 94596

Dear Mr. Kirsch:

Subject:

INVESTIGATION OF ALLEGATIONS 87081i0350 870715 PDR ADQCK 05000397 PDR

Reference:

Letter, DF Kirsch to DW Mazur, same subject, dated June 25, 1987 This letter is to confirm my conversation with Mr. Robert Pate of your office on July 9, 1987 wherein I requested an extension to the July 15, 1987 deadline imposed by the above referenced letter.

Your letter was not received by the Washington Public Power Supply System until July 7, 1987 which eliminated twelve days of the allotted time.

The complexities that this type of investigation may produce would in themselves make it necessary for us to request more than the allotted 20 days to complete the investigation.

To date, we have assigned a two-man investigative team to look into the subject allegations.

We are unable at this time to provide a schedule for completion, not knowing the impact of the allegations.

Therefore, we will provide your office with periodic updates concerning the investigation as we have information to report.

Upon completion of the investigation, the Washington Public Power Supply System will provide a final report of our conclusions and actions taken or to be taken.

Very truly your G.

C. Sorensen, Manager Regulatory Programs

0

~

4- ~ ~

II I

e

,r f

t 1