| number = ML17291A831
| issue date = 05/31/1995
| title = Monthly Operating Rept for May 1995 for WNP-2.W/950609 Ltr
| author name = Embree D, Parrish J
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000397
| license number =
| contact person =
| document report number = GO2-95-111, NUDOCS 9506130264
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 8
}}
 
=Text=
{{#Wiki_filter:RI (3 RI "EY PACCELERATED      RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9506130264                  DOC.DATE: 95/05/31 NOTARIZED: NO                  DOCKET FACIL:50-397    WPPSS      Nuclear Project, Unit 2, Washington Public                Powe  05000397 AUTH. NAME              AUTHOR AFFILIATION EMBREE,D.G.            Washington Public Power Supply System PARRISH,J.V.            Washington Public Power Supply System RECIP.NAME              RECIPIENT AFFILIATION
 
==SUBJECT:==
Monthly operating rept              for  May 1995    for  WNP-).W/950609  ltr DISTRIBUTION CODE: IE24D              COPIES RECEIVED:LTR            ENCL    SIZE TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT                  COPIES              RECIPIENT          COPIES ID CODE/NAME                LTTR ENCL          ID  CODE/NAME      LTTR ENCL PD4-2 PD                        1      1      CLIFFORD,J            1    1 INTERNAL:                                  10    10        AEOD/SPD/RRAB          1    1 E CENTE          1          1      1      NRR/DISP/PIPB          1    1 NRR~O ~~OECB                    1      1      RGN4                  1    1 EXTERNAL    LITCO BRYCE i J H                1      1      NOAC                  1    1 NRC PDR                          1      1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACI'THE DOCUMENT CONTROL DESK, ROOK! Pl-37 (EXT. 504-2083 ) TO ELliiIIVATEYOUR NA!iIE FROil DISTRIBUTION LISTS I'OR DOCl'ME. 4'I'S YOU DON "I'L'ED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                      20  ENCL      20
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 96B ~ 3000 George Washington Way ~ Richland, Washington 99352 June 9, 1995 G02-95-111 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:
 
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT MAY 1995 Transmitted herewith is the Monthly Operating Report for the month          of May   1995 as required by Technical Specification 6.9.1.6.
  . V. Parrish      (Mail Drop 1023)
Vice President, Nuclear Operations JVP:DGE CC:    LJ Callan, NRC RIV NRC Sr. Resident Inspector (927N)
INPO ANI Library Utility Data Institute BPA (399)
'st506f30264 95053i PDR
.R        '. ',
ADOCK 05000397
                  >,-",: PDR
 
            ~ t Q'> g~)~~ ~,
 
OPERATING STATUS REPORT for WNP-2 Date:  June 1, 1995
: 1. Docket: 50-397
: 2. Reporting Period: MAY 1995                                Outage  + On-Line Hours: 744.0
: 3. Utility
 
==Contact:==
David G. Embree (509) 377-8448 4    Licensed Thermal Power (MW, ):
: 5. Nameplate Rating (Gross MW, ):
: 6. Design Electrical Rating (Net MW,):
: 7. Maximum Dependable Capacity (Gross MW,):
: 8. Maximum Dependable Capacity (Net MW, ):
: 9. If changes occur above since last report, give reasons:
: 10. Power to which restricted, if any (Net MW,):                                                None
: 11. Reasons for restrictions, if any:
MONTH                YEAR              CUMULATIVE
: 12. Report Period Hours                              744.0              3,623.0              91,711.2
: 13. Hours Reactor Critical                              0.0            2,404.3              65,104.9
: 14. Rx Reserve Shutdown Hours                            0.0                  0.0                340.4
: 15. Hours Generator On-Line                              0.0            2,324.5              62,892.1
: 16. Unit Reserve Shutdown Hours                          0.0                  0.0                381.7
: 17. Gross Thermal Energy (MWH)                            0          7,404,028            186,666,868
: 18. Gross Electrical Energy (MWH)                          0          2,553,980            62,907,480
: 19. Net Electrical Energy (MWH)                      -6,104          2,445,691            60,270,825
: 20. Unit Service Factor                              0.0%                64.2%                  68.6%
: 21. Unit Availability Factor                          0.0%                64.2%                  69.0%
: 22. Unit Capacity Factor (MDC Net)                    0.0%                62.2%                  60.2%
: 23. Unit Capacity Factor (DER Net)                    0.0%                60.3%                  59.5%
: 24. Unit Forced Outage Rate                          0.0%                13.0%                  11.7%
: 25. Forced Outage Hours                                  0.0              348.6                8,319.7
: 26. Shutdowns scheduled over the next 6 months (type, date, duration):                    Refueling, April 22, 1995, 42 days.
: 27. Ifcurrently shutdown, estimated startup date:                                      June 4, 1995 Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.
 
t AVERAGE DAILY UNIT POWER LEVEL t
DOCKET NO.:        50-397 UNIT:    WNP-2 DATE:    June 1, 1995 COMPLETED BY:        D. G. Embree TELEPHONE:        (509) 377-844$
REPORT PERIOD:            MAY 1995 AVERAGE DAILYPOWER LEVEL                                      AVERAGE DAILYPOWER LEVEL DAY                    (Net MWe)                                DAY                (Net MWe)
                              -12                                  16
                              -10                                  17 18 4                                                                19 9                                  20
                                -9                                  21 22 23 24                        -7 10                                                              25                      -10
                                -'8                                  26                      -10 12                          -9                                  27                      -10 13                          -7                                  28 14                                                              29 15                                                              30 31                      -12 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
CR I
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:      50-397 UNIT NAME:      WNP-2 DATE:    June 1, 1995 COMPLETED BY:        D.G. Embree TELEPHONE:      (509) 377-8448 REPORT PERIOD:      MAY 1995 No.        Date    Type      Hours    Reason      Method    LER Number        System Component      Cause and Corrective Action To Prevent Recurrence 9545      4/22/95  S        744.0        C                      N/A            RC  FUELXX        Continuation from previous month.
 
==SUMMARY==
:              At the beginning of the month, the plant continued the annual refueling outage with an estimated startup date of June 4, 1995.
TYPE                      REASON                                                          METHOD                    SYSTEM & COMPONENT F - Forced                A - Equipment Failure            E - Operator Training &        1 - Manual                NUREG-0161 Exhibits F & H S - Scheduled            B - Maintenance or Test                  License Examination    2 - Manual Scram C - Refueling                    F - Administration            3 - Auto Scram D - Regulatory Restriction        G - Operational Error          4 - Continued H - Other                      5 - Reduced Load 9 - Other
 