| title = DC Cook Nuclear Plant USI A-46 Seismic Evaluation Rept.
| title = DC Cook Nuclear Plant USI A-46 Seismic Evaluation Rept
| author name =  
| author name =  
| author affiliation = STEVENSON & ASSOCIATES
| author affiliation = STEVENSON & ASSOCIATES
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:DONALD C. COOK NUCLEAR PLANT SEISMIC EVALUATION REPORT ATTACHMENT NO. 2 TO AEP:NRC: t040C RESPONSE TO NRC G.L. 87-02 UNRESOLVED SAFETY ISSUE A-46 BY STEVENSON 5. ASSOClATES CLEVELAND, OH        ~
{{#Wiki_filter:}}
                                                >r
                                                )
DECEMBER 1995 v
                                              /
'P602050080 960i30 pDR hooch, asoaosxs P              PDR
 
89C1570a/ Disk4 Wlkdwn11.9a Seismic Evaluation and Walkdown Summary Report of the Donald C. Cook Nuclear Plant Units 1 and 2 To Resolve Unresolved Safety Issue (USI) A46 and Generic Letter (GL) 8742 December 16, 1995 Performed for:
American Electric Power Service Corp.
1 Riverside Plaza Columbus, OH 43216-6631 Performed by:
Stevenson & Associates 9217 Midwest Ave.
Cleveland, OH 44125 (216)587-3805 Fax (216) 587-2205
 
TABLE OF CONTENTS 1.0  EXECUTIVE
 
==SUMMARY==
            ......... ~..................                    ~... ~....          1-1 1.1  Background and Objectives                              ~  ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  ~ ~
1.2  General Plant Description  ...............                                ~ ~ ~ ~ ~ ~ ~ ~ ~  ~
1.2.1 Site Location  ...                                                                                1-2 1.22  Primary Plant  System........                                                                      1-2 1.3  Report Organization                                                                            ~  1 3 2.0  SEISMIC DESIGN      BASIS.....                                              ~ ~ ~ ~ ~ ~ ~  ~ ~
2.1  Safe Shutdown Earthquake Ground Response Spectra                                ~ ~ ~ ~ ~ ~ ~  ~  2  1 22    In-Structure Response Spectra  ...................................                                2-1 2.3  Definition of Seismic Design Classification  ....................                                2-3 3.0  PROJECT TEAM        ...........                              ~  ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  ~ ~  ~
3.1  Integrated Team Approach                                                ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  ~
3.2  Seismic Review Team                                              ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  ~
3.3  Peer Reviewers    ...... ~..................          ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  ~
4.0  USI    A46    EVALUATION FOR              CLASS        OF        TWENTY-ONE EQUIPMENT      .... ~.....................          ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  ~  4  1 4.1  Overall Approach Taken    .......,..........          ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  ~
42    Seismic Screening Guidelines  ...            ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  ~
4.2.1 Seismic Capacity Vs. Demand                                            ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  ~
4.22  Caveat Compliance                                                                        ~ ~  o  44 42.3  Anchorage  Adequacy..........................................                                    4-5 42.4  Seismic Interaction Checks....,,..................,.............                                4-11
 
4.3  Outlier Resolution                                ~  ~  ~ ~ ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~ 4  11 4.4  Other Types of Seismic Evaluations and Interfaces  ...                                          ... 4-11 45    Documentation                                            ~  ~        ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~
4.6  Class  of Twenty-One Evaluation Results                                                          ... 4-13 4.6.1 Equipment Characteristics                                                                                4-16 4.6.2 Seismic Capacity Vs. Demand Results      ...........................                                    4-19 4.6.3 Equipment Class Description/Caveat Results    .        ~  ~  ~  ~  ~  ~ ~  ~  ~  ~  ~  ~  ~  ~  ~    4 20 4.6.4 Equipment Anchorage Results    ...................                                      ..... 4-21 4.65  Seismic Interaction and Other Issues              ~  ~ ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  4 22 4.6.6 Deviations and Commentary on Meeting the Intent of Caveats              ...........                      4-23 4.6.7 SQUG Action Items                                                    ~  ~  ~  ~    ~  ~  ~  ~  ~  ~  ~  4 23 4.7  Resolution of Identified Seismic Concerns and SQUG Action Items                    .......              4-24 5.0  TANK AND HEAT EXCHANGER                REVIEW...............                                              5-1 5 .1  Summary of  Review........................,...,              ..    ~...........                        5-1 5.1.1 Vertical Tanks  .                                              ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  5  1 5.1.2 Method of Solution for Vertical Tanks    ...............                                                  5-3 5.13  Determine Tank Seismic Demand                                                                            5-3 5.1.4 Determine Tank Seismic Capacity    . ~..............................                                    54 5.15  Horizontal Tanks and Heat Exchangers 52    Summary of  Results..............
52.1  Results - Vertical Tanks.................                                              ~  ~  ~  ~  ~  ~  56 5.2.2 Results - Horizontal Tanks and Heat Exchangers    .....................                                  5-7 11
 
6.0  CABLE TRAY AND CONDUIT RACEWAY REVIEW                                                              6-1 6.1  Scope  of the Raceway Review  . ~.... ~....... ~......                ~.............              6-1 6.2  Seismic Review Team    .............:........................                                ~ . ~ 6-1 6.3  Summary of the Plant Area Summary Sheets (PASS)              ..                                ~ 6-2 6.4  Summary of the Limited Analytical Reviews (LARs)              ..., ............                    6-2 65  Summary of Raceway Outliers  ...................                                ~  ~ ~ ~ ~ ~ ~ ~ 63 7.0  PLAN FOR ADDRESSING UNRESOLVED OUTLIERS AND OPEN ISSUES....,,........              ~  ~  ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
 
==8.0  CONCLUSION==
S AND RESULTS          ....                    ~ ~ ~ ~  ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 8 1
 
==9.0  REFERENCES==
      .                                                                  ~ ~ ~ ~ ~ ~ ~ 9 1 APPENDICES APPENDIX A Resumes of SCE's APPENDIX B Cook Nuclear Plant Floor Response Spectra APPENDIX C SVDS Forms 111
 
LIST OF FIGURES Figure 2-1 Cook Nuclear Plant Ground OBE, 5% Damping      ........... 24 Figure 2-2 Cook Nuclear Plant Ground DBE, 5% Damping      ...          2-7 Figure 4-1 Comparison Between 5% Damped Ground Response Spectra of Database Earthquakes and Cook Nuclear Plant  DBE......... 4-25 Figure 4-2 Comparison of 5% Damped Bounding Spectrum to the Cook Nuclear Plant DBE    ............................... 4-26
 
LIST OF TABLES Table 2-1 Damping Ratios Used for Design at Cook Nuclear Plant        ........        2-8 Table 4-1 Cook Nuclear Plant Unit  1 Equipment Items Containing Essential Relays .  ~                                                                  4-27 Table 4-2 Cook Nuclear Plant Unit 2 Equipment Items Containing Essential Relays  ..    ~                        ~    ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 4 31 Table 4-3 Cook Nuclear Plant Unit 1 Breakdown of Class of 21 Equipment Items Requiring a Seismic Walkdown                                              . 4-34 Table 44  Cook Nuclear Plant Unit 2 Breakdown of Class of 21 Equipment Items Requiring a Seismic Walkdown    .......,.............,....                  4-35 Table 4-5 Cook Nuclear Plant Unit 1 Outliers - for Class of 21 Equipment, Reasons, Proposed Resolution, Current Status  ................              4-36 Table 4-6 Cook Nuclear Plant Unit 2 Outliers - for Class of 21 Equipment, Reasons, Proposed Resolution, Current Status  ................              4M Table 4-7 Commentary on Equipment Items Meeting the Intent of GIP Caveats Table 4-8 Issues Tracked Using the SQUG Action Item Report Not Included a s an Outgoer......................,..................                      4-56 Table 5-1 Vertical Flat Bottom Tanks Reviewed for Cook Nuclear Plant ....              5-2 Table 5-2 Horizontal Heat Exchangers on at Least Two Saddles Reviewed for Cook Nuclear Plant .. ..
                                ~    ~...,................,.........                  5-7 Table 6-1 Summary of the Plant Area Summary Sheets (PASS) ...........                  64 Table 6-2 Summary of the Limited Analytical Review ..................                  64
 
1.0    EXECUTIVE
 
==SUMMARY==
 
1.1    Background and Objectives In December 1980, the Nuclear Regulatory Commission (NRC) designated "Seismic Qualification of Equipment in Operating Plants" as an unresolved safety issue (USI). The safety issue of concern was that equipment in nuclear plants for which construction permit applications had been docketed before about 1972 had not been reviewed according to the then-current (1980-81) licensing criteria for seismic qualification of equipment [i.e.,
Regulatory Guide (RG)      1.100~'>; Institute of Electrical and Electronics Engineers (IEEE)
Standard    344-1975<> Standard      Review Plan (SRP) Section 3.10 (NUREG4800, July 1981)< ~]. Therefore, the seismic adequacy of the equipment in these older plants may be questionable regarding their ability to survive and function in the event of a safe-shutdown earthquake (SSE). All operating plants for which equipment seismic qualification could not be verified to meet the intent of current licensing criteria were subject to the implementation provisions outlined in Generic Letter (GL) 8742, "Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A46."      ~"~
In response to USI A46, affected utilities formed an owners group known          as the Seismic Qualification Utility Group (SQUG) in the early 1980's to formulate a unified and reasonable approach to this issue. Industry seismic experts and firms were retained to assist SQUG in the formulation of an approach using past earthquake experience as a means to verify equipment seismic integrity.
Based on a wealth    of actual earthquake data    as well as data obtained from full-scale shake table tests of equipment, the seismic ruggedness          of certain classes of mechanical and electrical equipment has been established. This data has been assembled and a ground motion "Bounding Spectrum" has been established below which the integrity of certain equipinent can be assured upon meeting caveats developed for each equipment group. The Donald C. Cook Nuclear Plant, henceforth referred to          as Cook Nuclear Plant, site ground motion,    as  well as those of all other Eastern US power plants (east of the Rocky Mountains), has a design basis ground motion below the Bounding Spectrum. The seismic review of the plant for USI A46 was performed to the Cook Nuclear Plant Safe Shutdown Earthquake.
1-1
 
Although no explicit provisions within the USNRC regulations permitted the use of experience data as a means for seismic qualification, the USNRC determined that requiring older operating plants to comply with current licensing requirements was not practical because    a literal application of those criteria to older operating plants could require extensive modifications of those facilities that could not be justified from the cost4enefit standpoint. Therefore, the NRC concluded that the use of earthquake experience data, with appropriate inclusion rules and caveats, is appropriate for resolving USI A46.
The approach used for seismic verification of equipment at Cook Nuclear Plant for resolution of USI A46 is contained in the Generic Implementation Procedure (GIP)
Revision 2 as corrected<" which defines the requirements for the conduct of the effort. The approach involved selecting equipment that is required to safely shut down the plant and monitor the necessary functions to insure safe shutdown.          The selected equipment is documented      on the Safe Shutdown Equipment List (SSEL).              Experienced  seismic practitioners then conducted in-plant walkdowns (Seismic Screening and Verification Walkdown) to evaluate the adequacy of the equipment selected.
The USNRC reviewed the GIP, Revision 2 as corrected and issued Supplemental Safety Evaluation Report No. 2        <'>
(SSER No. 2). The USNRC endorsed the GIP Rev. 2, as corrected with some additional precautions. The USI A46 effort at Cook Nuclear Plant Unit 1  was performed      in accordance with the GIP, Rev. 2  as corrected and SSER    No2.
~
12      General Plant Description 12.1    Site Location Cook Nuclear Plant Units        1  and 2 employ a Pressurized Water Reactor (PWR) Nuclear Steam Supply System (NSSS) furnished by Westinghouse Electric Corporation ~W. The Reactor Coolant System (RCS) for each unit consists of four loops.                The reactor containment is an ice condenser containment. The current licensed Rated Thermal Power (RTP) for Unit      1 is 3250 Mwt, and    for Unit 2 is 3411 Mwt. The site is located along the eastern shore    of Lake Michigan in Lake Township, Berrien County, Michigan, about          11 miles south-southwest of Benton Harbor, Michigan.
122 Primary Plant          System For each unit, the primary plant system consists of a PWR, RCS, and associated auxiliary fluid systems. The RCS consists of four closed reactor coolant loops connected in parallel 1-2
 
to the reactor vessel, each loop containing a Reactor Coolant Pump (RCP) and a Steam Generator (SG), with an electrically Heated Pressurizer (PZR) connected to the hot leg of reactor coolant loop @3. The electrical heaters and spray nozzles in the PZR provide RCS pressure control. The SG's are vertical U-tube type heat exchangers utilizing Inconel tubes.
Auxiliary systems are provided to charge the RCS, add makeup water, purify the RCS, provide chemicals for corrosion inhibition and reactor control, cool system components, remove residual heat when the reactor is shutdown, sample reactor coolant water, provide for emergency safety injection, and vent and drain the RCS.
13      Report Orgaiiization The sections of this report are organized in accordance with Part  II, Section 9.4 of the GIP.
These sections include the following:
~      Section 1, "Executive Summary and Background Information".
~      Section 2, "Seismic Design Basis" (SDB) - The Cook Nuclear Plant Ground Response Spectra (GRS) and In4tructure Response Spectra (ISRS) are described. The initial seismic design of the plant equipment is described. The bases for determining how seismic demand is determined for each equipment class for the USI A46 evaluations are provided in Section 4, and documented on Screening Verification Data Sheet (SVDS) forms in Appendix C of this report.
~      Section 3, "Project Team" - The Cook Nuclear Plant project team is discussed.
Resumes for the Seismic Capability Engineers (SCEs) are included in Appendix          A of this report.
~      Section 4, "USI  A46 Evaluation for Class of Twenty-One Equipment" - Screening Verification and Walkdown results for mechanical and electrical equipment are discussed, in addition to the SVDS forms provided in Appendix C. Instances, when the intent of a caveat rule are satisfied but not the exact wording of the caveat, are identified in Table 4-7. A summary of outliers and their resolution is provided.
~      Section 5, "Tanks and Heat Exchanger Review" -Results of the tanks and heat exchangers reviews are discussed, including instances in which the intent, but not the letter, of a caveat is met. A summary of outliers and their resolution is provided.
1-3
 
Section 6, "Cable Tray and Conduit Raceway Review" -Results of the raceway review, including bounding samples and outliers, are summarized.
Section 7, "Plan for Addressing Unresolved Outliers" -The plan and schedule for addressing remaining unresolved outliers are discussed.
Section 8, "Conclusions and Results" -A brief summary of the conclusions and results of the overall USI A-46 project  is included.
Section 9, "References" -References made in the report are listed.
In addition to this report there are two other reports included in the USI A46 submittal that form the basis of the USI A46 evaluation at Cook Nuclear Plant. Attachment I of the S  l<<ll    S "D    ldC.C SN      1    Pl    S~S"          S  d        <<S of Cook Nuclear Plant Units 1 and 2 safe shutdown paths and associated equipment needed to achieve and maintain a safe shutdown condition for resolution of USI A46. Attachment 3 of the submittal is the "Donald C. Cook Nuclear Plant USI A46 Relay Evaluation Report," that documents the relay seismic evaluations for the Cook Nuclear Plant Unit 1 and 2 USI  A46 resolution.
 
2.0    SEISMIC DESIGN BASIS 2.1    Safe Shutdown Earthquake Ground Response Spectra The Cook Nuclear Plant is located in Berrien County Michigan along the shore of Lake Michigan. Historically this is a low seismicity area. The plant is conservatively designed for an operating basis earthquake (OBE) level    of 0,10 g ground acceleration and a design basis earthquake (DBE) level of 0.2 g ground acceleration. The DBE at Cook Nuclear Plant was used as the Safe Shutdown Earthquake, SSE, for the SQUG GIP evaluations.              Vertical ground response is two-thirds of the horizontal. value. This was based on the seismicity evaluation in which a judgment was made estimating the maximum intensity (Modified Mercalli Intensity VII-VIII)that would occur at the site. All seismic Class I systems and equipments are designed to withstand the effect of a design basis earthquake and seismic Class  II systems  and equipment are designed to withstand the loads due to an OBE. The seismic design was based on the ground acceleration response spectrum curves shown in Figure 2-1 for the operational basis earthquake, OBE, and Figure 2-2 for the Design Basis Earthquake, DBE. The DBE becomes the Safe Shutdown Earthquake by definition using the GIP'~ guidance.      The spectra were derived from the "Housner Spectrum" normalized to 0.10g for the OBE and 0,20g for the DBE.
22      In4tructure Response Spectra The in-structure response spectra (ISRS) used for the USI A46 project are the Cook Nuclear Plant design basis ISRS. A detailed description of the design basis ISRS derivation is contained  in the Cook Nuclear Plant 120-day response to Supplement No. 1 to GL 8742 (AEP:NRC1040A and AEP:NRC:1040B). The applicable floor response spectra (where the equipment is located) are included as part of Appendix B.
The USNRC reviewed the design basis ISRS for Cook Nuclear Plant and the method used for their development prior to the USI A46 evaluation. The USNRC review concluded that the USNRC staff considers the Cook Nuclear Plant spectra to be "median centered". The Cook Nuclear Plant USI A46 evaluation treated the spectras as "median centered" as a 2-1
 
result of this review.
The GIP defines "median centered" in-structure response spectra as spectra that would result in using realistic damping and realistic calculational methods while based on a somewhat conservative Ground Response      Spectra (i.e. Reg. Guide 1.60, etc.). Conservative In-Structure Spectra are response spectra that have been computed generally in accordance with the conservatism of current NRC Regulatory Guidelines (such      as Reg. Guide 1.60 for Ground Spectrum Shape and 1.61 for Damping).
In the case of Cook Nuclear Plant  as described  in Section 2.1, the SSE Ground Response Spectrum Shape was based upon the recommendation of Housner.              This shape is less conservative than Reg. Guide 1.60, however retains an acceptable overall design margin by using lower damping levels than permitted by Reg. Guide 1.61. In review of the plant's "in-structure" response spectra, the NRC took the conservative approach by classifying the in-structure response spectra for all plants included in the SQUG program with Housner Spectra as "median centered".
The ISRS are not available at some of the floor elevations where the safe shutdown equipment is located. When this is the case, either the ISRS for a higher elevation or the ISRS developed by a linear. interpolation between existing ISRS may be used in the evaluation. In the  case of the Auxiliary Building at Elevation 609 feet, since the interpolated ISRS are very close to the corresponding ISRS for the Diesel Generator Building, the ISRS for the Diesel Generator Building were used.
The designation of the in~tructure response spectra as "median centered" had the following impacts on the project: 1) Anchorage calculations were performed using an additional 125 factor for computing the seismic demand and 2) an additional 150 factor was used for the seismic demand spectra when comparing to Generic Equipment Ruggedness                Spectra (GERS) (this had the most impact on the capacity vs. demand evaluations for relays) which are the subject of a separate report included in Attachment 3.
2-2
 
23      Definition of Seismic Design Classification All equipment and structures at Cook Nuclear Plant are classified      as Class I, Class II, or Class  III as recommended in:
: a.      TID-7024, "Nuclear Reactors and Earthquakes" August,      1963< >
and
: b.      G.W. Housner, "Design of Nuclear Power Reactors Against Earthquakes," '+
Proceedings of the Second World Conference on earthquake Engineering Vol.
I, Japan  1960, pg. 133, 134 and 137.
Those structures and components including instruments and controls whose failure might cause or increase the severity    of a loss-ofeoolant accident or result in an uncontrolled release of excessive amounts of radioactivity are classified Class I. Class I structures and components also include those vital to safe shutdown and isolation of the reactor.
Those structures and components which are important to reactor operation but not essential to safe shutdown and isolation of the reactor and whose failure could not result in the release of substantial amounts of radioactivity are classified Class II.
Those structures and components which are not related to reactor operation or containment are classified as Class  III.
The original equipment seismic qualification at Cook Nuclear Plant was per the requirements of Specification DCC-NE-101-QCN, which was based on the draft IEEE-344-1971~"~ standard. Subsequently, some replacement components have been installed per the requirements of the IEEE 344-1975<~> standard.
At the time of the Unit 2 operating license, Cook Nuclear Plant      was one    of the plants audited by the NRC as part of the Seismic Qualification Review Team (SQRT). As a result, the following items were requalified under the requirements of IEEE-344-1975.
2-3
 
~Anal  is
: 1. Diesel Engine Foundation
: 2.      Diesel Engine Lube Oil Sump Tank
: 3.      Diesel Generator Control Panels (DG-AB, DG-CD)
: 4.      Battery Room Exhaust Fans
: 5.      Control Room Air Handling Isolation Dampers
: 6. Motor Driven Auxiliary Feed Pumps
: 7. Turbine Driven Auxiliary Feed Pumps
: 8. Essential Service Water Pumps
: 9. CCW Heat Exchangers
: 10. Refueling Water Storage Tanks
: 11. Main Steam Safety Valves
: 12. Main Steam Isolation Valves
: 13. Safety Injection System Front Panel
: 14. Hot Shutdown Panel
: 15. Auxiliary Relay Panels Testing
: 1. GE Relays
: 2. Power Relays
: 3. Control Relays
: 4. Differential Pressure  Indicators  (Model 227), Switches      (Model 288A) and Transmitters (Model 368)
: 5. Battery Rack
: 6. Battery Chargers
: 7. Switchgears (4KV and 600V) 8,    Critical Solenoid Valve Panels
: 9. Inverters
: 10. Transfer Switch The equipment items for Unit  1 are essentially identical to the requalified IEEE-344-75 equipment for the Unit 2 operating license.
2-5
 
0.1g OBE COOK NUCLEAR PLANT 5o/o DAMPING 0.20 h  ~        ~ ~
0  0.15 I-K UJ
: 0. I 0 CC o~  0 05                                    (
Uj tL                                ~ ~ ~ I GO I
: 0. 00 0            'to              20    30            40 FREQUENCY (Hz)
Figure 2-1 Donald C. Cook Nuclear Plant OBE Ground Response Spectrum 5% Damping 2-6
 
0.2g DBE COOK NUCLEAR PLANT 5% DAMPING 0.40
                              ~ \W
                                                          '1 ~
z 0      0.30 I-Sr    W ~
K UJ
          ~
0.20      N
                                    \
CC 0.10
                                                        '0 Iq I~ ~ 'L ~ ~
R 0.00 0              'to                20                40 FREQUENCY (Mz)
Figure 2-2  Donald C. Cook Nuclear Plant DBE Ground Response Spectrum 5% Damping 2-7
 
Table 2-1 Damping Ratios Used for Design at Cook Nuclear Plant'(Table 5.24 of the UFSAR)
T  e of Structure                  Percent of Critical Dam in Operating Basis        Design Basis
                                                  ~Eh k                        k Containment Structure and all internal            4%
* 7%
* concrete structures                                2%                    5%
Other conventionally reinforced concrete structures above grade, such as            2%                    5%
shear walls or rigid frames Welded structural steel assemblies                  1%                    1%
Bolted 'or riveted steel assemblies                2%                    2%
Piping                                            0.5%                  05%
(* Analyzed with accident conditions)
(** Analyzed without accident conditions)
Note; ABC Reg. Guide 1.61 (Oct. 1973) permits the use of higher damping values than those values indicated in this Table.
The damping ratios for the USI A46 effort are defined in the GIP(~. For the majority of the equipment classes this is defined as 5% damping.
2-8
 
3.0    PROJECT TEAM 3.1    Integrated Team Approach The Cook Nuclear Plant SQUG project was a joint engineering effort between the AEPSC Engineering Staff and the Consultant Project Staff (Stevenson and Associates). In addition to the project management and contract management work associated        with the use of consultant resources, AEPSC Engineers were integrated with the consultant team in all aspects  of the w'ork. AEPSC SQUG task group provided dedicated support for the development of the SSEL, SSEL Reports, Anchorage Inspection Data Sheets, Relay List and Relay List Report and the review of all engineering packages co'mpleted for the project (Seismic Evaluation Work Sheets, Cable Tray and Raceway Report, and the Seismic Evaluation Report) and participation as Seismic.Walkdown Team Members during the Screening Walkdowns.
32      Seismic Review Team The Walkdown Teams were composed of at least two Seismic Capability Engineers per the GIP. At least one of the Seismic Capability Engineers was a Registered Professional Engineer. With a few exceptions each walkdown team was composed of one Consultant Engineer, one AEPSC Engineer and Systems/Operations        Personnel from AEPSC or the Cook Nuclear Plant site staff and one engineer from site design to provide details of the anchor inspection. Seismic Capability Engineers were as follows:
From Stevenson and Associates:
J. D. Stevenson (PE)
W. Djordjevic (PE)
G. G. Thomas S. Anagnostis P. R. Wilson (PE) 3-1
 
G. Harstead (PE)
From AEPSC:
T, R. Satyan Sharma (PE)      Project Manager I.C. Huang (PE)              Structural Engineer P. Krugh                      Structural Engineer B. A. Svensson                Executive Staff Assistant; Former Assistant Plant Manager, Operations (SRO)
R. P. Leonard                  Plant Systems Engineer, (PE)
J. Dunlop                      Systems Engineer R. Steele                      Electrical Engineering; Lead Relay Engineer H. W. Young                    Mechanical Engineering, (PE)
J. M. Nieto                    Nuclear Engineering/Safety  Ec Licensing K. Mahajan                    Electrical Engineering, (PE)
T. Jeyasekaran                Site Design M. Baskerville                Electrical Design Resumes for the walkdown team members are included in Appendix A.
33      Peer Reviewers Dr. Robert P. Kennedy of RPK4tructural Mechanics Consulting performed the peer review for the USI A-46 project at Cook Nuclear Plant. Dr. Kennedy's review covered all seismic evaluation areas of the project and included a review of the draft report, two visits to the plant site during the Screening Walkdowns for a sample walkdown and a review of the documentation.
3-2
 
4.0      USI A46 EVALUATIONFOR CLASS OF TWENTY-ONE EQUIPMENT 4.1      Overall Approach Taken SQUG developed the GIP to provide an experience data base, technical approach, generic procedure, and documentation requirements which can be used by owners of currently operating nuclear power plants to address the requirements of GL 8742~"i. SQUG has worked closely with EPRI since 1982 to provide information to the NRC staff to assist in the resolution of USI A-46. The GIP was used to address the NRC's Unresolved Safety Issue (USI)    A46, "Seismic Qualification of Equipment in Operating Plants," as required by NRC Generic Letter 8742 and supporting documents.
Final project data was recorded using Stevenson & Associates proprietary program called the GIPPER<'. The Objective of the GIPPER Software Package (of which ANCHOR4 is a part) is to create and maintain the set  of USI A46 data bases  for plant specific seismic verification data and to provide the tools to implement the analytical procedures specified in GIP.
The GIPPER is a Windows-based expert system, designed to simplify and fully digitize the GIP and provides the necessary documentation for seismic verification of nuclear'lant equipment, as well as serve as a SQUG configuration control tool.
The GIPPER contains GIP caveats, procedures, and reporting data necessary to perform seismic evaluations. Through the GIPPER, the following information is stored and maintained in electronic databases:
      . Safe Shutdown Equipment Lists (SSEL)
Seismic Evaluation Work Sheets (SEWS)
Outlier Seismic Verification Sheets (OSVS)
Raceway Plant Area Summaries Spectra Comparisons Anchorage Evaluations 4-1
 
Tank Evaluations Relay Evaluations Photos Drawing/Sketches Documents The evaluation of an item of equipment or relay can be revised, and all revised states of each item are documented and retrievable.        Complete evaluation reports are generated through the GIPPER's printing options.
Hard copies of the required forms including the Screening Verification Data Sheets (SVDS),
and Screening Evaluation Work Sheets (SEWS), were developed and signed by the Seismic Capability Engineers. The references which document the criteria and procedures used for this walkdown, are the SSRAP report '~, URS anchorage report        ', and the USNRC SSER No. 2 on the GIP.'@
42    Seismic Screening Guidelines The procedure for performing the Screening Verification and Walkdown is based on the following four seismic screening guidelines:
: 1. Seismic Ca acit vs. Seismic Demand - The seismic capacity of the equipment, based    on earthquake    experience  data, generic seismic testing data, or equipment-specific seismic qualification data, should be greater than the seismic demand imposed on the equipment by the safe shutdown earthquake (SSE)  ~
: 2. Caveat Com liance - In order to use the seismic capacity defined by the earthquake experience Bounding Spectrum, the equipment should be similar to the equipment in the earthquake experience equipment class and also meet the intent of the specific caveats for that class of equipment. If equipment-specific seismic qualification data is used, then any specific restrictions or 4-2
 
caveats for that qualification data apply instead.
: 3.      Anchora e Ade uac - The equipment anchorage capacity, installation, and stiffness should be adequate to withstand the seismic demand from the SSE at the equipment location.
: 4. Seismic Interaction Checks - The effect of possible seismic spatial interactions with nearby equipment, systems, and structures should not cause              the equipment to fail to perform its intended safe shutdown function, The evaluation of equipment against each of these four screening guidelines at Cook Nuclear Plant is based upon walkdown evaluations, calculations, and other supporting data.
42.1    Seismic Capacity Vs. Demand Cook Nuclear Plant determined the seismic capacity of safe shutdown equipment using:
        ~      Earthquake experience data with capacity defined by the Bounding Spectrum,'
Equipment-specific seismic qualification data, or data on similar equipment.
The seismic demand imposed on an item of equipment depends on whether or not the ground spectrum or amplified floor response spectra were used, and how      it is compared to the capacity data.
As described in the SSRAP report<">, well anchored industrial grade equipment have performed well in earthquakes      with a magnitude much greater than the SSE defined earthquake at Cook Nuclear Plant. Figure 4-1 shows a comparison of the 5%.damped SSE design basis response spectrum and the 5% damped response spectra for the earthquakes used to develop the SSRAP Bounding Spectrum. As demonstrated by this figure, equipment in these facilities were subjected to much greater vibration than expected at the Cook Nuclear Plant site.
4-3
 
The SSRAP Bounding Spectrum recommended              for use during GL 8742/USI A46 evaluations in Reference 13 and adopted by the SQUG GIP envelopes the Cook Nuclear Plant SSE ground response spectra over the entire frequency range as shown in Figure 4-2.
Generally, conservative floor spectra were compared to 15 times the bounding spectrum.
To a lesser extent, the ground spectrum was compared to the bounding spectrum for equipment within about 40 feet of grade with an estimated fundamental frequency greater than 8 Hz. Newer, upgraded equipment that had been seismically qualified in accordance with the IEEE 344 Standard,          1975  Edition or later, was accepted      based  on this documentation and was supplemented by an additional review as documented in the Seismic Evaluation Work Sheets, SEWS, by the SRT's.
For purposes of determining the 40 feet Above Grade elevation, effective grade for the site and/or each building must be determined. "Effective grade" at a nuclear plant is defined      as the average elevation of the ground surrounding the building along its perimeter. As Cook Nuclear Plant is a soil site, effective grade was established at 608 feet.
422    Caveat Compliance The second screening guideline which must be satisfied to verify the seismic adequacy of an item of mechanical or electrical equipment is to confirm that (1) the equipment characteristics are generally similar to the earthquake experience equipment class and (2) the equipment meets the intent of the specific caveats for the equipment class. This review is only necessary when the Bounding Spectrum is used to represent the seismic capacity        of an item  of equipment. If equipment-specific  seismic qualification data is used instead, then only the specific restrictions applicable to that equipment-specific qualification data need be applied.
Another aspect of verifying the seismic adequacy of equipment included within the scope of this procedure is explained by the "rule of the box." For the equipment included in either the earthquake or testing equipment class all of the components mounted on or in this equipment are considered to be part of that equipment and do not have to be evaluated
 
1 separately. However, the walkdown engineers did look for suspicious details or uncommon situations which could make the equipment item vulnerable.
An item of equipment should have the same general characteristics      as the equipment in the earthquake experience equipment class. The intent of this caveat is to preclude items of equipment with unusual designs and characteristics which have not demonstrated seismic adequacy in earthquakes or tests.
"Caveats" are defined as the set of inclusion and exclusion rules which represent specific characteristics and features particularly important for seismic adequacy of a particular class of equipment.      Appendix B of the GIP contains a summary of the caveats for the earthquake experience equipment class and for the generic seismic testing equipment class.
The "intent" of the caveats should be met when evaluating an item of equipment as they are not fixed, inflexible rules. Engineering judgment is used to determine whether the specific seismic concern addressed      by the caveat is met. Each item of equipment should be evaluated to determine whether      it meets the specific wording of the applicable caveats and their intent. However,    if an item of equipment meets the intent of the caveats but the specific wording of the caveat rule is not met, then that item is considered to have met the caveat. At Cook Nuclear Plant, a small number of SSEL items were judged to meet the intent, ifnot the exact wording of a caveat and these cases are reported in Subsection 4.6.6 of this report.
423 Anchorage Adequacy Anchorage adequacy was verified with an approach incorporating three elements:
        ~      Comparison of the anchorage capacity with the seismic demand.
        ~      Evaluation of the anchorage to verify that it is free of gross installation defects.
        ~      Evaluation of the equipment anchorage load path to verify that there is adequate stiffness and strength.
4-5
 
The screening approach for verifying the seismic adequacy of equipment anchorage is based upon a combination of inspections, analyses, and engineering judgment.    ~fns  ections consist of measurements and visual evaluations of the equipment and its anchorage, supplemented by use of plant documentation and drawings. ~Anal ses compare the anchorage capacity to the seismic loadings (demand) imposed upon the anchorage.        These analyses were done using the guidelines in Section 4 and Appendix C of the GIP, En ineerin      'ud ment is also an important element in the evaluation of equipment anchorage.        As a general rule, all unique significantly sized equipment items were rigorously analyzed using the ANCHOR4
~
software package developed by Stevenson & Associates that is included in the GIPPER software. Small equipment, weighing usually 100 lbs. or less was accepted by judgment and a "tug test". The tug test simply involves pulling on the device (say, a wall-mounted transmitter) with a force to exceed 2-3 g's of equivalent acceleration. Other instances where judgment was used included basing anchorage adequacy on calculations for anchorage from other equipment items at Cook Nuclear Plant.
The four main steps used to evaluate seismic adequacy of equipment anchorages at Cook Nuclear Plant followed the guidance of the GIP and are shown below:
: 1.      Anchorage Installation Inspection
: 2.      Anchorage Capacity Determination
: 3.      Seismic Demand Determination
: 4.      Comparison of Capacity to Deman'd The first main step in evaluating the seismic adequacy of anchorages is to check the anchorage installation and its connection to the base of the equipment.        This inspection consists of visual checks and measurements along with a review  of plant documentation and drawings where necessary.
Prior to the walkdown, site technicians were trained on the anchorage inspection procedures and requirements of the GIP. Using this training, the site technicians documented the
  . anchorage configuration for each equipment item, including the length and size of the welds, embedment length of cast in place and expansion anchors, concrete quality (cracking or
 
spalling), etc. The as-built anchorage drawings reduced the walkdown effort substantially and aided in the quick calculation of the equipment anchorage capacity. The SRT, however, also looked at the anchorage in the field and investigated any observed inconsistencies with the plant as4uilt drawings. In general the technician generated Anchorage Inspection Data Sheets    included all instances of potential anchorage or concrete deficiencies (spalled concrete, missing bolt washers, etc.). Most of the time these potential deficiencies were reconciled by further SRT inspection. The Anchorage Inspection Data Sheets are included with the detailed SEWS.
3 All accessible anchorages were visually inspected. A check of the following equipment anchorage attributes was made;
: 1.      Equipment Characteristics
: 2.      Type of Anchorage
: 3.      Size and Location  of Anchorage
: 4.      Installation Adequacy
: 5.      Embedment Length
: 6.      Gap at Threaded Anchors
: 7.      Spacing Between Anchorages
: 8.      Edge Distance
: 9.      Concrete Strength and Condition
: 10.      Concrete Crack Locations and Sizes
: 11.      Essential Relays in Cabinets
: 12.      Equipment Base Stiffness/Prying Action
: 13.      Equipment Base Strength/Structural Load Path
: 14.      Embedment Steel and Pads 4-7
 
The equipment    ~dam  in for certain classes  of equipment are given in Section C.l of the GIP and were used in this study.
For expansion anchors, a tightness check is required to detect gross installation defects (such as oversized  concrete holes, total lack of preload, loose nuts, damaged subsurface concrete, and missing plug for shell types) which would leave the anchor loose in the hole.          The tightness check was waived for expansion anchors supporting raceway hangers. The tightness check for expansion anchors is accomplished by applying a torque to the anchor by hand until the anchor was "wrench tight," i.e., tightened without excessive exertion. If the anchor bolt or nut rotates less than about      I/4  turn, then the anchor is considered tight. The tightness checks and embedment checks were performed during the detailed anchorage inspections.
The second main step in evaluating the seismic adequacy of anchorages is to determine the allowable capacity of anchors used to secure an item of equipment. The allowable capacity s
is obtained by multiplying the nominal allowable capacities by the applicable capacity reduction factors. The nominal capacities and reduction factors are obtained from Appendix C  of the GIP, based on the results of, the anchorage installation inspection checks.
The pullout capacity allowable is based on the product of the nominal pullout capacity and the applicable capacity reduction factors:
Pgg  =  P<0~ RTp  RLp RSp REp RFp RCp RRp Where:        P u
                    = Allowable Pullout capacity of installed anchor (kip)
Pnom = Nominal allowable Pullout capacity (kip)
RT~= Reduction factor for the ~Te of expansion anchors RL = Reduction factor for short embedment Lengths RS,= Reduction factor for closely ~Saced anchors RE~= Reduction factor for near Edge anchors 4-8
 
RF= Reduction factor for low strength      (Q  concrete RC~=    Reduction factor for Cracked concrete RR~= Reduction factor for expansion anchors securing equipment with essential Relays The shear capacity allowable is based on the product of the nominal shear capacity and the applicable capacity reduction factors:
Vgj)    Vgp~ RTg RLg RSg REg RFg RRg Where:        V, = Allowable shear capacity of installed anchor (kip)
V, = Nominal allowable shear capacity (kip)
RT, = Reduction factor for the ~Te of expansion anchors          .
RL, = Reduction factor for short embedment Lengths RS, = Reduction factor for closely ~Saced anchors RE, = Reduction factor for near Edge anchors RF, = Reduction factor for low strength    (Q  concrete RR, = Reduction factor for expansion anchors securing equipment with essential Relays Note that the pullout and shear capacities for anchors given above are based on having adequate stiffness in the base of the equipment and on not applying significant prying action to the anchor. IfBase  Stiffness and Prying Action show that stiffness is not adequate or that significant prying action is applied to the anchors, then the Seismic Capability Engineers lowered the allowable capacity loads accordingly.
The third step in evaluating the anchorages was to determine the seismic demand imposed 4-9
 
on the equipment.      The demand was established based on the type of demand spectrum used. Ifthe amplified floor spectra  were used, an additional 1.25 factor of conservatism was used to establish the demand load since the          floor spectra were deemed realistic mean centered. The demand load was simply determined based on spectral acceleration value times the weight of the equipment.        Equipment weight was estimated by either using the drawing weight or the maximum weights given in Table C.1-1 of the GIP. Estimates of fundamental frequency were based on shake table or in situ vibration tests and use of Table C.1-1  of the GIP. If the item was deemed rigid, the zero period acceleration (ZPA) was used. If the  item was deemed flexible, the peak of the response spectrum above the fundamental frequency was used.      If the  fundamental frequency is given in the SEWS, then the largest spectral acceleration in the range from that estimated frequency to the ZPA is used. If the ground spectrum is used for demand, then 1.875 times the appropriate spectral acceleration is used where 1.875 is the product of 15, the median amplification factor, and 1.25, the additional anchorage factor    of conservatism for non-conservative demand spectra.
In the original design of the plant, many electrical equipment were seismically qualified by testing, This data was a valuable tool for estimating the lowest natural frequency of this equipment, since this was defined by a resonance              search of the equipment. Many mechanical equipment items were rigorously analyzed, and as such had a calculated estimate of the first natural frequency.      In addition, Report No, MT2, "Summary Report of Fundamental Frequencies        Determined By In4itu Transfer Function Testing at Cook Nuclear Plant," dated August 10, 1994'" documents the testing of several electrical equipment items. The minimum fundamental frequency from these tests was determined for most generic electrical equipment items at Cook Nuclear Plant. These included various cabinets, panels, unistrut racks, switchgear, MCC's, and inverters. This report was also a valuable tool for estimating frequencies.
The fourth and final step to complete the anchorage evaluation compares the seismic demand to the anchorage capacity.      If the  demand is less than the capacity, the anchorage is acceptable; otherwise, the equipment item is declared an outlier.
4-10
 
42.4  Seismic Interaction Checks The fourth and final screening guideline used to verify the seismic adequacy of an item of mechanical or electrical equipment was to confirm that there were no adverse seismic spatial interactions with nearby equipment, systems, and structures which could cause the equipment to fail to perform its intended safe shutdown function. The interactions of concern are (1) proximity effects, (2) structural failure and falling, and (3) flexibility of attached lines and cables.      Guidelines for judging interaction effects when verifying the seismic adequacy    of equipment are presented in Appendix D of the GIP.
During the plant walkdowns at Cook Nuclear Plant, the SRT's identified only a few interaction concerns. These particular issues and their resolution are discussed in detail in Section 4.65.
,Overhead piping systems and ductwork were closely examined in all plant areas containing A46 equipment. The SRT's identified very few potential vulnerabilities and noted that the distribution systems were, in general well supported.
43      Outlier Resolution An outlier is defined  as an item of equipment which does not meet the screening guidelines noted above. An outlier may be shown to be adequate for seismic loadings by performing additional evaluations such as the seismic qualification techniques currently being used in newer nuclear power plants.          These  additional evaluations  and alternate  methods recommended by the SRT were documented on the Outlier Seismic Verification Sheets (OS VS).
4.4      Other Types of Seismic Evaluations and Interfaces In addition to the seismic evaluations covered in Section        4 for active mechanical and electrical equipment, seismic evaluations for two other types of equipment are covered in 4-11
 
other sections as follows:
o    Section 5 - Tanks and Heat Exchangers Review o    Section 6 - Cable and Conduit Raceways Review While seismic evaluations of the above items can generally be performed independently from those for active mechanical and electrical equipment, there are a few areas where an interface with the Relay Functionality Review is appropriate:
      ~    Any cabinets containing essential relays,    as  determined by the relay review, should be evaluated for seismic adequacy using the guidelines contained in this section.
      ~    A capacity reduction factor should be applied to expansion anchor bolts which secure cabinets containing essential relays. The capacity reduction factor is discussed in Section 4.4 and Appendix C    of the GIP.
e    Seismic interaction, including even mild bumping, is not allowed on cabinets containing essential relays. This limitation is discussed in Section 45 of the GIP.
      ~    In-cabinet amplification factors for cabinets containing essential relays may be estimated, using the guidelines in Section 6 of the GIP, by the Seismic Capability Engineers for use in the Relay Functionality Review.
Equipment items containing relays are listed in Table 4-1 for Unit 1 and Table 4-2 for Unit
: 2. The special requirements for equipment containing relays were applicable to these items.
4$    Documentation AEP documented the results of the Screening Verification and Walkdown for Cook Nuclear Plant on Screening Verification Data Sheets (SVDS) in Appendix C.
As discussed in Section 4.4, the discussion of the review of Heat Exchangers    8c Tanks and 4-12
 
Cable Tray  4  Conduit Raceways is given in Sections 5 and 6, respectively.
Qutliers and other concerns identified during the USI A46 effort for all equipment are discussed in Sections 4.6, 4.7, and 7.0. The Relay Functionality Assessment is given in a separately bound report entitled, "Donald C. Cook Nuclear Plant USI A-46 Relay Evaluation Report."
4.6    Class of Twenty-One Evaluation Results This section of the USI A46 report documents the seismic screening results for the mechanical and electrical equipment items.
I The screening walkdowns gathered the necessary data to support the screening process and to implement the requirements of the GIP. Included in the scope of this effort were the evaluations performed following the screening walkdown to demonstrate          the basis for screening decisions made during the walkdown. The seismic capability walkdowns also served to collect any additional data needed        to complete the component evaluations.
Results of the Screening and Verification Walkdowns were documented on the Screening Evaluation Work Sheets (SEWS). Photographs were also taken during the walkdowns as part of the data recording process. Photographs taken during the walkdown are included on the individual SEWS for the equipment.
In addition to the screening evaluations performed during the Seismic Screening and Verification Walkdowns, an anchorage inspection walkdown was conducted. Bolt tightness checks on all accessible equipment items bolted to a concrete floor or wall were performed 1
as described  in Section 4.2.3. The results of the tightness checks were documented on the sketches and notes  of the Anchor Inspection Data Sheets prepared for each equipment item that are signed by the anchorage inspection team.
The Cook Nuclear Plant site design personnel performed detailed anchorage inspections, and documented the results on the Anchorage Inspection Data Sheets, which included detailed  information on all anchorages        (length, size, gaps,  dimensions,  concrete 4-13
 
imperfections, etc). The Seismic Review Capability Engineers reviewed and provided a final check for the anchorage checks during the SRT walkdowns.
The SRT performed a visual inspection of the anchorage and made final judgment on the anchorage condition. Reduction factors for the anchorage were taken for any conditions judged by the SRT to warrant a reduction in accordance with the GIP. In general the technicians performing the anchorage walkdowns documented any observable imperfections, regardless  of whether the condition warranted  a reduction or not.
Using the results from the anchorage        inspections  and tightness checks,  anchorage evaluations were performed using ANCHOR4 in the "GIPPER" Software package after the completion of the Seismic Screening And Verification Walkdowns.
The walkdowns were performed in several stages as follows:
: 1)      Trial Plant Walkdown of thirty-five Unit  1 RHR System Components and selected Electrical Equipment items, the week of July 15, 1991.
: 2)      Unit 1 Electrical and Containment Outage Walkdown the week of July      18, 1992.
: 3)      Unit 2 Electrical and Containment Outage Walkdown the week of October 29, 1992.
: 4)      Balance of Plant Equipment Walkdowns the weeks of October 4, 1993, October 18, 1993, November 1, 1993, and November 15, 1993.
: 5)      Miscellaneous Equipment Walkdowns the weeks of April 11, 1994 and September 26, 1994.
The walkdown comments of the SRT's were documented in the notes of the SEWS for the various items. The signed Screening Verification Data Sheets (SVDS) for the walkdowns are included by each Walkdown Team in Appendix C.
The Seismic Verification and Evaluation Walkdow'ns included the evaluation of 901 equipment items requiring a seismic walkdown for Unit 1, and 877 equipment items for Unit
: 2. Of these equipment items, many were evaluated using the "Rule of the Box". However, 4-14
 
each of these "box" components were inspected on the parent item and evaluated using engineering judgment that; (a) the item was in the database, (b) the attachment of the item to the parent was adequate and, (c) that there were no adverse seismic interactions for the item. This evaluation is documented on the SEWS and SVDS for the item. Tables 4-3 and 44 indicate the breakdown by class of the    901 and 877 equipment items requiring a seismic walkdown in Unit 1 and 2 respectively.
The walkdowns and seismic evaluations performed for the USI A46 effort identified 47 equipment items that were outliers for Unit 1 and 39 equipment items that were outliers for Unit 2. Outlier issues and the recommended resolution by the SRT are included          as Tables 45 and 4.6 for Unit 1 and Unit 2 respectively.
Seismic concerns, open items, and other maintenance              concerns identified during the walkdowns and evaluations were tracked using AEPNO Procedure No. 66100-LTG-5400-16 SQUG Action Item Report. By the conclusion of the USI A46 effort and the submittal of this report most of these issues had been reconciled either on a Screening Basis using the GIP guidance, or by designating the item    as an  outlier. Table 4-8 lists those SQUG Action Items for Class of 21 equipment not identified      as outliers but requires some plant action (replacing missing ID tags, tightening a loose redundant bolt, etc.), and generic issues.
There were four generic interaction concerns and one generic conduit concern that is being tracked using the SQUG Action Item Report.
These Generic Interaction Issues included general seismic housekeeping              issues  in the Control Room;overhead sodium lamps with open hooks in the Diesel Generator Room, portable fire extinguishers    mounted on small hooks, and loose tie4own cables on Emergency Battery Lights, Rather than make a number of equipment items outliers due to these generic concerns, we believe that a more complete resolution could be provided on a plant generic basis. Issues still being tracked at the time    of this submittal for Class of 21 equipment using the SQUG Action Items are included in Table 4-8.
Many of the concerns identified lent themselves to minor plant modifications. The final 4-15
 
documentation (SEWS and SVDS) for the project reflect the field conditions at the time when the walkdown was completed for a particular component. All other equipment items were screened successfully, except those described in Sections 4.6.2 to 4.65 of this report.
Tables 4-5 and    44 list all the    47 and 39 outlier equipment items in          Unit    1 and 2 respectively. In Unit  1 there were nine equipment items with two outlier issues (See
                                                                                              'issue'olumn in Table 4-5), and therefore there were 56 total issues. Thirteen issues were due to Capacity vs Demand, twelve because of caveats, ten due to anchorage, twenty due to seismic interaction concerns, and one due to other issues.
In Unit 2 there were eight equipment items with two outlier        issues (See 'issue'olumn in Table 4-6), and therefore, there were 47 total issues. Nine issues were due to Capacity vs Demand, eleven due to caveats, seven due to anchorage, eighteen due to interaction, and two due to other issues.
4.6.1  Equipment Characteristics Equipment at the Cook Nuclear Plant is typical of equipment in Nuclear Power facilities of the late 60's and early 70's vintage.        Equipment at the Cook Nuclear Plant is well represented  in the earthquake experience data base and met caveat no.            1 for Class 20 equipment items.
The results of the seismic walkdown are summarized as follows:
There are some equipment items identified as Class 0 in Unit 1 and 2 which were primarily passive, and were similar to items considered as components        of the class of 21 equipment.
For these equipment items the SRT        assessed  the potential for seismic damage and made the necessary evaluations. All these items were at locations in the plant where 15 times the Bounding Spectrum is greater than the floor response spectra where they were located.
                                                                                      ~
                                                                                        'he MCC's were all Cutler-Hammer MCC's, 90 inches in height by 20 inches by 20 inches.
The MCC's were normally welded in the back and were either J-bolted or expansion 4-16
 
anchored in the front. Some were bolted on both sides.
The Class 2 and 3 switchgears were made by ITE Imperial Corporation. The weak link in the anchorage for them was plug welds. The loading on the anchorage was only in shear because  of the natural frequency of the switchgear and their high aspect ratio. The Reactor Trip Breakers (Class 2) were Westinghouse DB-50 variety and were filletwelded to embeds in the front and back.
Class 4 transformers varied greatly in size and function. There were very small transformers (1 foot-9 inches by    1  foot-8 inches) mounted in the Diesel Generator Room panels, transformers in medium sized enclosures (4 feet-6 inches by 2 feet-6 inches by 2 and very large 600 VAC Bus supply transformers that are 8 feet-6 inches by 8 feet-feet'nches),
10 inches by 5  feet and weigh 11,800 lbs. The transformers were all well anchored, primarily by expansion anchors.      Manufacturers included Solidstate Controls, Square D, and BBC Brown Boveri.
Class 5 horizontal pumps varied from very small pumps such as the 135 lb Diesel Lube                  Oil Filter Pumps, pumps weighing 2020 lbs, 9580 lbs, 15500 lbs, and the very large Centrifugal Charging Pumps. Pumps were generally very well anchored with cast-in-place J-bolts or bolts with headed studs. All easily passed the ANCHOR analyses.
Class 6 vertical pumps include the RHR Pumps, Containment Spray Pumps, and the very large ESW Pumps.        The ESW Pumps were larger than those included in the database.
However, seismic adequacy was demonstrated by analysis.
The Class 7 and 8 valves had many manufacturers, depending on their size and function.
Documentation normally existed demonstrating that the yokes and bodies were of steel.
Several valves were outside the limits of the database.        However, all met the caveat restrictions by demonstrating the yoke had acceptable stress when subjected to a 3g load.
Motor operators were almost exclusively of the Limitorque variety.
The Class 9, 10, and 12 fans, air handlers, and air compressors were of several different 4-17
 
manufacturers and a variety of sizes,    Anchorage types also varied greatly, but in general were very well anchored, (other than outliers 2-HV-AES-1 and 2), and have adequate anchorage margins.
The Class    11 chiller units were mounted on non-seismic vibration isolators, and were outliers because of this issue. The condensers and evaporators were considered as part of the chiller package during the walkdown.
Class 14 distribution panels were normally small wall mounted units that had very high anchorage margins. There were several different manufacturers.
Class 15 battery racks were two step racks. Two    of the racks had their anchorage greatly upgraded, Anchorage for all the units met the GIP requirements. Some of the batteries are now greater than 10 years old and will be replaced using the criteria stated in ANSI/ IEEE STD 450-1987.
Class 16 battery chargers varied in size from 2 feet-9 inches x 2 feet x 3  feet'nches in height, to larger units 6 feet in height. The chargers were normally anchored with at least four 1/2 inch expansion anchors.
The Class 17 Diesel Generators        were very large and manufactured      by Worthington Industries. Many of the supporting components were separate from the Diesel skid.
Class 18 transmitters were manufactured by Mercoid, Magnetrol International, Foxboro, and Gamma-Metrics.      They were normally small (25 lb to 35 lb) and individually supported.
Class 19 temperature sensors were small, well supported, and seismically rugged.
Class 20 control panels and cabinets were either very rugged stand alone panels or part    of the Main Control Board. The stand alone panels were typically anchored with expansion bolts. The Main Control Board panels were welded to embeds at the base and braced against the walls of the Control Room.
4-18
 
Class 21 tanks and heat exchangers includo the large      flat bottom tanks and the horizontal saddle supported heat exchangers that have specific GIP criteria. These are discussed in Section 5 of this report. Other tanks and heat exchangers include large buried horizontal tanks, (Diesel Fuel Oil Storage Tanks), tanks supported on legs, (e,g. Boron Injection Tanks), large vertical exchangers supported at the base and braced at the top, (e.g. RHR Heat Exchangers), and small exchangers to cool oil on pumps.
There are 63 and 58 equipment items identified as Class 21 in Unit        1 and 2 respectively.
Of these tanks and heat exchangers there were only 20 where the GIP criteria was applicable. The remaining 101 were evaluated by meeting the intent of the GIP criteria.
Anchorage was evaluated using the GIP criteria.
4.62    Seismic Capacity Vs. Demand Results There were twenty-two equipment items in Unit        1 and 2 combined that were outliers due to the capacity vs. demand issue.
Seismic Capacity vs. Demand was primarily satisfied by use of the Earthquake Experience Bounding Spectrum.        As shown in Figure 4-1 there is substantial margin between the 5 percent damped Cook Nuclear Plant Horizontal SSE Ground Response Spectrum and the four California earthquakes that were the basis of the Bounding Spectrum. Figure 4-2 shows the margin between the Cook Nuclear Plant 5 percent damped SSE Ground Response Spectrum and the Bounding Spectrum.
For screening seismic adequacy purposes, two methods are used:        1) Comparison  of ground spectra to bounding spectra and 2) Comparison of floor spectra to 15 times bounding spectra. Since most equipment items are below 40 feet above grade and could be shown to have a first natural frequency above 8 Hz using the in-situ modal test results in Reference 15, the Cook Nuclear Plant Ground Spectrum vs. Bounding Spectrum comparison could be used. However,    it is noted that the major electrical equipment items tested as documented 4-19
 
C in Ref. 15 also pass the Capacity vs. Demand requirements by comparing the 15 times the Bounding Spectrum to the Cook Nuclear Plant Floor Response Spectrum. Both methods were used to meet the capacity vs. demand requirement.
As indicated in Tables 4-5 and 4-6, there were twenty-two items in Unit    1 and 2 combined that were outliers due to the Capacity vs. Demand issue. These were generally small valves in the upper portions of the Containment Building. They willbe resolved by comparing test data of the valves to piping analysis results indicating the seismic demand on the valves at the SSE level. It is worth noting that these valves would easily screen using the Seismic h
Margins methodology for a 0.3g ZPA earthquake, since that program does not have          a 40 foot limitation on use of the ground spectrum.
4.63    Equipment Class Description/ Caveat Results Equipment items at Cook Nuclear Plant have configurations typical of equipment of the late 1960's - eaily 1970's vintage.      The Cook Nuclear Plant used the same equipment manufacturers for similar items in Unit    1 and 2. Electrical equipment was from only a few sources. Almost all motor operators were Limitorque. Mechanical equipment including valves were from a wider range of vendors, depending on the equipment size and function.
The equipment was quite typical of equipment found in other nuclear facilities of the same vintage, and easily met the description caveats for a given class.
As indicated in Tables 4-5 and 4-6, there were twenty-three equipment items in Unit    1 and 2 combined that had caveat concerns.      These were due to two valves that were in contact with a pipe whip restraint (also an interaction issue), two pumps with long unsupported piping, four chillers on non~eismically designed vibration isolators, four electrical panels with essential relays and not bolted to the adjacent panel, four panels with components that were inadequately latched and.could slide out, one switchgear with essential relays not bolted to an adjacent cabinet and two because of inadequate anchorage embedment (also an anchorage concern), and four battery racks that had some batteries older than 10 years.
4-20
 
4.6.4  Equipment Anchorage Results Equipment anchorages at Cook Nuclear Plant were of many different types and included welds to embedded steel, and many types of expansion bolts and cast-in-place J-bolts and headed studs.
Electrical equipment were either bolted with expansion anchor bolts or welded to an embed, or combination of the two. Most of the expansion anchors were determined to be either Phillips or Hilti variety. The applicable anchorage reduction factor for the type of anchorage was taken. When the type could not be determined the 0.6 factor for unknown expansion bolts was taken, The MCC's, for example, were typically welded to embedments with fillet welds at the base in the rear and expansion bolted or J-bolted in the front. Switchgear were typically welded to embeds with plug welds through holes in the base frame of the unit provided by the manufacturer. Stand alone control panels, bench boards, battery chargers and inverters were typically anchored to the floor with expansion anchor bolts or J-bolts. Distribution panels were typically expansion anchor bolted to the supporting wall or bolted to embedded unistrut. The main control board was both anchored at the base with welds to embeds and braced against the wall with expansion bolts. Mechanical equipment and large tanks were typically anchored with cast-in-place J-bolts or headed studs. The vast majority of the anchorage was covered by the criteria in the GIP. With very few exceptions, the bolts for floor anchored equipment were accessible and were bolt tightness tested. Many of the wall mounted panels could not have their anchorage tightness checked due to inaccessibility.
There were only 17 items that were outliers due to anchorage. These included two pumps where the embedment length could not be determined, four chillers wi:h nonweismically designed vibration isolators, three components where nozzle loads are unknown and need to be included in the anchorage analysis, four small instruments mounted on a common support with a missing bolt at its base, two panels with expansion anchors only in the pad 4-21
 
above the base concrete, and two fans with anchors with inadequate embedment.
4.6.5  Seismic Interaction and Other Issues During the plant walkdowns, the SRT's identified thirtywight total interaction concerns in Unit 1 and Unit 2 combined on individual equipment items, and four generic concerns that are being tracked by the SQUG Action Item tracking as discussed in Section 4.6. The SRT's identified no vulnerabilities with regard to the distribution systems and noted that these systems were well supported.
There were 38 equipment items that were identified      as interaction outliers in Unit  I and 2 combined, not encompassed by the generic interaction action items (such as open hooks on overhead lights, brackets for wall mounted fire extinguishers, etc.). The 38 issues identified, included two valves tightly up against a pipe whip restraint, two valves close to a railing that can swing into the valves, three valves with inadequate clearance from a beam or wall, fourteen panels with essential relays not bolted to an adjacent wall or panel, two RTD's that bear directly on grating, one MOV close to a floor grating, one block wall in a non-safety related area, two panels too close to a fire extinguisher on a short hook (also a generic action item), two panels with essential relays with an unsecured shear panel and ladder near by, four panels with essential relays with a pendant light that can interact with the panels (also a generic action item), two switchgear with essential relays not bolted to an adjacent panel, two pumps with an overhead fan on vibration isolators, one tube off a hydraulic controller bearing on a railing, one panel with essential relays with an inadequately secured chain above it, and one heat exchanger with a valve touching a tubing line.
There were three outliers due to other issues.      These included one pressure switch with missing hardware, one valve with a missing packing nut, and one valve out of service during the walkdowns that require a walkdown.
4-22
 
0
            ~  ~
4.6.6
  ~ ~    Deviations and Conmientary on Meeting the Intent of Caveats No significant or programmatic deviations from the GIP were made while performing the walkdowns and seismic adequacy evaluations at Cook Nuclear Plant for resolution of USI A46. Very few interpretations were made with respect to the specific wording of the GIP caveats versus the caveat's intent. The commentar, for the interpretations of those items meeting the "intent" of the GIP for class of 21 equipment are included in Table 4-7. In general judgments and calculations performed met the c'aveat requirements as clarified in Appendix B of the GIP. An example of a clarification used includes the 3g load check on yokes of motor operated valves that do not meet the experience based size and operator offset limits in Table B.8-1 of the GIP. Another example is neglecting non-effective anchors or anchorage in the anchorage evaluations.        If the remaining anchorage had sufficient strength and stiffness to meet the GIP requirements these items were not considered to be outliers and they were not listed in Table 4-7. These issues are not specifically called out in Table 4-7 since the GIP Appendix B wording and anchorage discussion allows these interpretations. Other equipment (not listed in Table 4-7) met the caveat rules as stated and clarified in the GIP.
4.6.7    SQUG Action Items During the SQUG project, seismic open issues and other maintenance issues identified during the plant reviews were tracked using the SQUG Action Item Log. Most of these issues were reconciled using the screening criteria in the GIP. Some      of the Items were ultimately identified  as outliers and are included in Tables 4-5 and 4-6. Other items are covered by the relay and SSEL reports.        Table 4-8 includes Class of 21 items that were tracked using this log that were not designated as outliers or as screened equipment items, and required some modification either to the plant or documentation.            There were twenty three items listed on this table that fall into this criteria.
4-23
 
4.7    Resolution of Identified Seismic Concerns and SQVG Action Items The USI A46 effort at Cook Nuclear Plant included the "optional" recommendation of the SRTs to reconcile the outliers or open issues. Tables 4-5 and 4-6 include the SRT proposed resolution for the outlier issues. These recommendations      were normally accepted  as indicated in the "Comments" column of these tables. The resolution of the outliers were either completed or are planned to be completed by additional analytical evaluations or minor plant modifications. There are twenty non-outlier issues listed in Table 4-8 that are tracked as SQUG Action Items that require some modification either to the plant or documentation.
4-24
 
C      COALINGA  E  EL CENTRO  S  SYLMAR L    LLOLLEO  H ~ 0.2g DBE COOK C  ~ ~ ~ ~ ~ ~ 0 E          S  L  H -
5'AMPING
: 2. 00 1.80 1.60 1.40 IX:
1.20 1.00 0
0.80 0.60                                                        ~ \~~ ~~ ~~
I-0.40 0
v)  0.20 0.00 0                      10        15      20      25            30 FREQUENCY (Hz)
Figure 4-1 Comparison Between 57o Damped Ground Response Spectra of Database Earthquakes and Donald C. Cook Nuclear Plant DBE
 
8  BOUNDING SPECTRUM  H 0.20 DBE COOK NUCLEAR PLANT 5% DAMPIMG 1.00 0.90 0
I-K 0.60 UJ 0.50 0
0.40 0.30 I-0.20 LL m    0.10 0.00 0      5      10    15      20      25      30      35 FREQUENCY (Hz)
Figure 4-2 Comparison Between 5% Damped Bounding Spectrum to the Donald C.
Cook Nuclear Plant DBE 4-26
 
Table 4-1 Cook Nuclear Plant Unit 1 Equipment Items Containing Essential Relays Item  Equipment I.D.                  Equipment Description 1-A11          AUX RELAY PANEL A11 1-A13          AUX RELAY PANEL A13 1-AB-N        250 VDC VALVE CONTROL CENTER AB-N 1-ABD-A        600 VAC MOTOR CONTROL CENTER ABD-A 1-ABD-B        600 VAC MOTOR CONTROL CENTER ABD-B 1-ABD-D        600 VAC MOTOR CONTROL CENTER ABD-D 1-ABV-A        600 VAC MOTOR CONTROL CENTER ABV-A 1-ABV-D        600 VAC MOTOR  CONTROL CENTER ABV-D 1-ACR A-1      CONTROL ROOM AIR HANDLING SUBPANEL &#xb9;1 10  1-ACRA-2        CONTROL ROOM AIR HANDLINGSUBPANEL &#xb9;2 1-AM-A          600 VAC MOTOR CONTROL CENTER        AM-A 12  1-AM-D          600 VAC MOTOR CONTROL CENTER AM-D 13  1-A RA-2        REACTOR PROTECTION TRAIN A AUX RELAY CAB      &#xb9;2 14  1-AZ-BC        600  VAC MOTOR CONTROL CENTER AZ-BC 15    1-AZV-A        600  VAC MOTOR CONTROL CENTER AZV-A 16    1-BC-A        BATTERY CHARGER A FOR N TRAIN BATTERY 17    1-BC-A-PNL    BATTERY CHARGER A CONTROL BOX 18    1-BC-AB1      PLANT BATTERY BATT-AB BATTERY CHARGER        &#xb9;1 19    1-BC-AB2      PLANT BATTERY BATT-AB BATTERY CHARGER&#xb9;2 20    1-BC-'B        BATTERY CHARGER B FOR N TRAIN BATTERY 21    1-BC-B-PNL    BATTERY CHARGER B CONTROL BOX 22    I-BC<DI        PLANT BATTERY BATTED BATTERY CHARGER&#xb9;1 23    I-BC<D2        PLANT BATTERY BATTED BATTERY CHARGER        &#xb9;2 I<RID-I-INV    120 VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEMS CHANNEL I INVERTER 4-27
 
1 lt ~
/ I                /<  1
      >'/'
t a 4
                      ~)
Ea
 
Table 4-1 cont'.
Item Equipment I.D.                  Equipment Description I<RID-11-INV  120 VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEMS CHANNEL II INVERTER 26  1<RID-111-    120 VAC CONTROL ROOM INSTRUMENT DISTRIBUTION INV            SYSTEMS CHANNEL Iil INVERTER 27  1<RID-IV-INV  120 VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEMS CHANNEL IV INVERTER 28  1-DGAB        AB EMERGENCY DIESEL GENERATOR CONTROL SUBPANEL 29  I-DGAB-INV    AB EMERGENCY DIESEL GENERATOR INVERTER
                'I 30  1-D GAB-X      AB EMERGENCY DIESEL GENERATOR AUXILIARY SUBPANEL 31  1-DGCD        CD EMERGENCY DIESEL GENERATOR CONTROL SUBPANEL 32  1-DGCD-INV    CD EMERGENCY DIESEL GENERATOR INVERTER 33  1-DGCD-X      CD EMERGENCY DIESEL GENERATOR AUXILIARY SUBPANEL 34  1-EFR IMARI          EMERGENCY FIRE PANEL INSTRUMENT/RELAYRACK 35  1-EZC-A        600  VAC MOTOR CONTROL CENTER EZC-A 36  1-EZC-B        600 VAC MOTOR  CONTROL CENTER EZC-B 37  1-EZC<        600  VAC MOTOR CONTROL CENTER EZC<
38  1-EZC-D        600  VAC MOTOR CONTROL CENTER EZC-D 39                GENERATOR PANEL REAR INSTRUMENT/RELAYRACK
                    &#xb9;1 1&R2          GENERATOR PANEL REAR INSTRUMENT/RELAYRACK 1&RB          GENERATOR PANEL REAR INSTRUMENT/RELAYRACK B 42  I-HSD1R        UNIT 1 HOT SHUTDOWN PANEL REAR RACK 43  1-LSI-1        STEAM GENERATORS    &#xb9;1 AND &#xb9;4 LOCAL SHUTDOWN STATION 4-28
 
    /
f t
f j I
 
Item Equipment LD.                  Equipment Description 1-LSI-2        STEAM GENERATORS    &#xb9;2 AND &#xb9;3 LOCAL SHUTDOWN STATION 45 1-LSI-3          REACTOR 'COOLANT SYSTEM CHARGING AND LETDOWN LOCAL SHUTDOWN STATION 46  1-N21-RACK      NUCLEAR INSTRUMENTATIONCHANNEL I LOCAL INSTRUMENT RACK 47  1-N23-RACK      NUCLEAR INSTRUMENTATIONCHANNEL LOCAL INSTRUMENT RACK 48  1-NIS-III      NUCLEAR INSTRUMENTATIONSYSTEM PROTECTION CHANNEL III CONTROL PANEL 49  1-NSR          NUCLEAR INSTRUMENTATIONSYSTEM REAR INSTRUMENT RELAY RACK 50  1-PS-A          600 VAC MOTOR CONTROL CENTER PS-A 51  I-PS-D          600 VAC MOTOR CONTROL CENTER PS-D 52  1-RPC-1        REACTOR PROTECTION CHANNEL I CAB        &#xb9;1,2,  3, 4 53  1-RPC-2        REACTOR PROTECTION CHANNEL II        &#xb9;5, 6, 7 54  1-RPC-3        REACTOR PROTECTION CHANNEL III CAB        &#xb9;9, 10, 11 55  1-RPC4          REACTOR PROTECTION CHANNEL IV CAB &#xb9;12,          13 56  1-RPS-A      ~
REACTOR PROTECTION AND SAFEGUARD ACTUATION TRAIN A CABINET 57  1-RPS-B        REACTOR PROTECTION AND SAFEGUARD ACTUATION TRAIN B CABINET 58  1-RPSX-A        REACTOR PROTECTION AND SAFEGUARD ACTUATION TRAIN A AUXILIARYCABINET 59  1-RPSX-B        REACTOR PROTECTION AND SAFEGUARD ACTUATION TRAIN B AUXILIARYCABINET 60  ISA            STATION AUXILIARIESCONTROL PANEL 61  14R1            STATION AUXILIARIESREAR INSTRUMENT/RELAYRACK
                    &#xb9;1 62  14R2            STATION AUXILIARIESREAR INSTRUMENT/RELAYRACK
                    &#xb9;2 4-29
 
Table 4-1 cont'.
Item Equipment I.D.                  Equipment Description 63  14R3          STATION AUXILIARIESREAR INSTRUMENT/RELAYRACK
                    &#xb9;3 64  14R4          STATION AUXILIARIESREAR INSTRUMENT/RELAYRACK
                    &#xb9;4 65  14SR          ENGINEER SAFETY SYSTEM REAR INSTRUMENT/RELAY RACK 66  14WR          NUCLEAR INSTRUMENTATIONSOURCE RANGE N21 INSTRUMENT/RELAYRACK 67  1-T11A        4KV T11A SWITCHGEAR 68  1-T11B        4KV T11B SWITCHGEAR 69  1-T11C        4KV T11C SWITCHGEAR 70  1-T11D        4KV T11D SWITCHGEAR 71  1-TFP          TURBINE DRIVEN AUX FEEDPUMP SUBPANEL 1-TRB          TURBINE PANEL REAR INSTRUMENT/RELAYRACK B 73  1-TRD          TURBINE PANEL REAR INSTRUMENT/RELAYRACK D 74  1-TRE          TURBINE PANEL REAR INSTRUMENT/RELAYRACK E 75  1-WRR          CONTROL ROOM WEST INSTRUMENT RELAY RACK 4-30
 
Table 4-2 Cook Nuclear Plant Unit 2 Equipment Items Containing Essential Relays Item    Equipment I.D.                  Equipment Description 2-A11          AUX RELAY PANEL A11 2-A13          AUX RELAY PANEL A13 2-AB-N        250 VDC VALVE CONTROL CENTER AB-N 2-ABD-A        600 VAC MOTOR CONTROL CENTER ABD-A 2-ABD-B        600 VAC MOTOR CONTROL CENTER ABD-B 2-ABD-D        600 VAC MOTOR CONTROL CENTER ABD-D 2 ABV-A        600 VAC MOTOR CONTROL CENTER ABV-A 2-ABV-D        600 VAC MOTOR CONTROL CENTER ABV-D 2-ACRA-1      CONTROL ROOM AIR HANDLING SUBPANEL &#xb9;1 10    2-AC RA-2      CONTROL ROOM AIR HANDLING SUBPANEL &#xb9;2 2-AM-A        600  VAC MOTOR CONTROL CENTER AM-A 12    2-AM-D        600  VAC MOTOR CONTROL CENTER AM-D 13    2-A RA-2      REACTOR PROTECTION TRAIN A AUX RELAY CAB        &#xb9;2 14    2-AB-A        600  VAC MOTOR CONTROL CENTER AB-A 15    2-AZV-A        600 VAC MOTOR CONTROL CENTER        AZV-A 16    2-BC-A        BATTERY CHARGER A FOR N TRAIN BATTERY 17    2-BC-A-PNL    BATTERY CHARGER A CONTROL BOX 18    2-BC-AB1      PLANT BATTERY BATT-AB BATTERY CHARGER      &#xb9;1 19      2-BC-AB2      PLANT BATTERY BATT-AB BATTERY CHARGER      &#xb9;2 20      2-BC-B        BATTERY CHARGER B FOR N TRAIN BATTERY 21      2-BC-B-PNL    BATTERY CHARGER B CONTROL BOX 2-BC<D1        PLANT BATTERY BATTED BATTERY CHARGER        &#xb9;1 23    2-BCCD2        PLANT BATTERY BATTED BATTERY CHARGER        &#xb9;2 2<RID-I-INV    120 VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM CHANNEL I INVERTER 2CRID-II-INV    120 VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM CHANNEL II INVERTER 4-31
 
Table 4-2 cont'.
Item Equipment I.D.                    Equipment Description 26  2CRID-III-INV  120 VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM CHANNEL III INVERTER 27  2<RID-IV-INV    120 VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM CHANNEL IV INVERTER 28  2-D GAB        AB EMERGENCY DIESEL GENERATOR CONTROL SUBPANEL 29  2-DGAB-INV    AB EMERGENCY DIESEL GENERATOR INVERTER 30  2-DGAB-X      AB EMERGENCY DIESEL GENERATOR AUXILIARY SUBPANEL 31  2-DGCD        CD EMERGENCY DiESEL GENERATOR CONTROL SUBPANEL 2-DGCD-INV    CD EMERGENCY DIESEL GENERATOR INVERTER 33  2-DGCD-X      CD EMERGENCY DIESEL GENERATOR AUXILIARY SUB PANEL 34  2-EFR          EMERGENCY FIRE PANEL INSTRUMENT/RELAYRACK 35  2-EZC-A        600  VAC MOTOR CONTROL CENTER EZC-A 36  2-EZC-B        600  VAC MOTOR CONTROL CENTER EZC-B 37  2-EZCC        600 VAC MOTOR    CONTROL CENTER EZC<
38  2-EZC-D        600 VAC MOTOR CONTROL CENTER EZC-D 39  2&R1          GENERATOR PANEL REAR INSTRUMENT/RELAY RACK
                    &#xb9;1 2<R2          GENERATOR PANEL REAR INSTRUMENT/RELAYRACK
                    &#xb9;2 41  2-HSD2R        UNIT 2 HOT SHUTDOWN PANEL REAR RACK 42  2-LSI-1        STEAM GENERATORS      &#xb9;1  AND &#xb9;4 LOCAL SHUTDOWN STATION 43  2-LSI-2        STEAM GENERATORS      &#xb9;2  AND &#xb9;3 LOCAL SHUTDOWN STATION 2-LSI-3        REACTOR COOLANT SYSTEM CHARGING AND LETDOWN LOCAL SHUTDOWN STATION 45  2-N21-RACK    NUCLEAR INSTRUMENTATIONCHANNEL I LOCAL INSTRUMENT RACK 4-32
 
Table 4-2 cont'.
Item Equipment I,D.                  Equipment Description 46  2-N23-RACK    NUCLEAR INSTRUMENTATIONCHANNEL III LOCAL INSTRUMENT RACK 47 2-NIS-III      NUCLEAR INSTRUMENTATIONSYSTEM REAR INSTRUMENT/RELAYRACK 48  2-NSR          NUCLEAR INSTRUMENTATIONSYSTEM REAR INSTRUMENT/RELAYRACK 49  2-PS-A        600 VAC MOTOR CONTROL CENTER PS-A 50  2-PS-D        600 VAC MOTOR CONTROL CENTER PS-D 51  2-RPC-1        REACTOR PROTECTION CHANNEL I CAB        &#xb9;1, 2, 3, 4 52  2-RPC-2        REACTOR PROTECTION CHANNEL II CAB        &#xb9;5,  6, 7 53  2-RPC-3        REACTOR PROTECTION CHANNEL III CAB        &#xb9;9,  10, 11 54  2-RPC4        REACTOR PROTECTION CHANNEL IV CAB. &#xb9;12,          13 55  2-RPS-A        REACTOR PROTECTION AND SAFEGUARD ACTUATION TRAIN A CABINET 56  2-RPS-B        REACTOR PROTECTION AND SAFEGUARD ACTUATION TRAIN B CABINET 57  2-RPSX-A      REACTOR PROTECTION AND SAFEGUARD ACTUATION TRAIN A AUXILIARYCABINET 58  2-RPSX-B      REACTOR PROTECTION AND SAFEGUARD ACTUATION TRAIN B AUXILIARYCABINET 59  2%A            STATION AUXILIARIESCONTROL PANEL 60  24R1          STATION AUXILIARIES,REAR INSTRUMENT/RELAYRACK
                    &#xb9;1 61  24R2          STATION AUXILIARIESREAR INSTRUMENT/RELAYRACK
                    &#xb9;2 62  24R3          STATION AUXILIARIESREAR INSTRUMENT/RELAYRACK
                    &#xb9;3 63  24R4          STATION AUXILIARIESREAR INSTRUMENT/RELAYRACK
                    &#xb9;4 64  24SR          ENGINEER SAFETY SYSTEM REAR INSTRUMENT/RELAY RACK 4-33
 
Table 4-2 cont'.
Item Equipment I.D.                  Equipment Description 65  24WR          NUCLEAR INSTRUMENTATIONSOURCE RANGE N21 INSTRUMENT/RELAYRACK 2-T21A        4 KV T21A SWITCHGEAR 67 2-T21B        4 KV T21B SWITCHGEAR 68  2-T21C        4 KV T21C SWITCHGEAR 69  2-T21D        4 KV T21D SWITCHGEAR 70  2-TFP          TURBINE DRIVEN AUX FEEDPUMP SUBPANEL 71  2-TRB          TURBINE PANEL REAR INSTRUMENT/RELAYRACK B 2-TRD          TURBINE PANEL REAR INSTRUMENT/RELAYRACK D 73  2-TRE          TURBINE PANEL REAR INSTRUMENT/RELAYRACK E 74  2-WRR          CONTROL ROOM WEST INSTRUMENT RELAY RACK 4-34
 
Table 4-3 Cook Nuclear Plant Unit 1 Breakdown of Class of 21 Equipment Items Requiring a Seismic Walkdown Equipment Class          Number          Equipment Class      Number
: 0. Other (Miscellaneous              50      11. Chillers Equipment Items)
: 1. Motor Control Centers            19      12. Air Compressors
: 2. Low Voltage Switchgear            65      13. Motor-Generators
: 3. Medium Voltage Switchgear          34      14. Distribution Panels    35
: 4. Transformers                      12      15. Batteries on Racks
: 5. Horizontal Pumps                  32      16. Battery Chargers A    12 Inverters
: 6. Vertical Pumps                              17. Engine-Generators
: 7. Fluid-Operated Valves            194      18. Instruments on Racks  73 (including SR Vs)                              (Including individually mounted transmitters)
: 8. Motor-Operated and                135      19. Temperature Sensors    34 Solenoid Operated Valves
: 9. Fans                              36      20. Instrumentation and    84 Control Panels and Cabinets
: 10. Air Handlers                              21. Tanks and Heat        63 Exch angers 4-35
 
Table  44 Cook Nuclear Plant Unit 2 Breakdown of Class of 21 Equipment Items Requiring a Seismic Walkdown Equipment Class        Number            Equipment Class      Number
: 0. Other (Miscellaneous              51        11. Chillers Equipment Items)
: 1. Motor Control Centers            18        12. Air Compressors
: 2. Low Voltage Switchgear            55        13. Motor-Generators
: 3. Medium Voltage Switchgear        34        14. Distribution Panels    35
: 4. Transformers                      12        15. Batteries on Racks
: 5. Horizontal Pumps                  31      16. Battery Chargers  Ec  12 Inverters
: 6. Vertical Pumps                            17. Engine-Generators
: 7. Fluid-Operated Valves            193      18. Instruments on Racks    72 (including SRVs)                              (Including individually mounted transmitters)
: 8. Motor-Operated and              135      19. Temperature Sensors    33 Solenoid Operated Valves
: 9. Fans                            33        20. Instrumentation and    82 Control Panels and Cabinets
: 10. Air Handlers                              21. Tanks and Heat          58 Exch angers 4-36
 
Table 4-5 Cook Nuclear Plant Unit 1 Outliers for Class of 21 Equipment Reasons, SRT Proposed Resolution, Comments ID          ISSUES                              REASONS                                    SRT PROPOSED                    COMMENTS RESOLUTION I-DCR-310 Caveats              Diaphragm of the valve tightly up against a pipe        Recommend action to get            Note No. 3 Seismic Interaction  whip restraint. Load on the operator is like a cold    adequate clearance for the valve spring on the piping system. SRT examined the          diaphragm from the pipe whip valve when piping was in the hot condition, it          support.
appears when. the pipe is cold the condition could get worse. The valve Bonnet connects a circular tube member at the bottom of the valve 1.6 inch in outside diameter. This is the weak link in the valve for transferring the seismic load on the operator (not the yoke).
1-DCR-320 Caveats              The diaphragm of valve tightly up against a pipe        Recommend action to get            Note No. 3 Seismic Interaction  whip restraint. Load on the operator is a cold spring  adequate clearance for the valve on the piping system. SRT examined the valve when      diaphragm from the pipe whip piping was in the hot condition, it appears when the    support.
pipe is cold the condition could get worse. The valve bonnet connects a circular tube member at the bottom of the valve 1.6 inch in outside diameter.
This is the week link in the valve for transferring the seismic load on the operator (not the yoke).
1-MMO-220 Seismic Interaction  Adjacent railing can rotate and swing into the valve    Move the railing at least 4 inches  Note No. 2 operator.                                              from the operator.
4 1-MMO-230 Seismic Interaction  Adjacent railing can rotate and swing into the valve    Move the railing at least 4 inches  Note No. 2 operator.                                              from the operator.
5 1-DRYS    Seismic Interaction  The valve has less than I inch clearance to adjacent    Restrain pipe at valve from the    Note No. I structural steel beam and the SRT can easily push      beam.
the valve so it makes contact with the steel beam.
6 1-PP~I    Anchorage            Only one bolt is known to have suf5cient                Testing of Bolts C and D            Note No.2 embedment (identified as Anchor A in the                (inaccessible due to insulation) to Anchorage Inspection)                                  show adequate embedment for at least one of these bolts would resolve this issue.
4-37
 
ID          ISSUES                              REASONS                                SRT PROPOSED                    COMMENTS RESOLUTION 12-PP-31N  Caveats            Must check inlet and outlet pipe nozzle loads      Define Inlet and outlet piping    Note No. 4 Anchorage          piping is laterauy unrestrained. Pump is classed an  loads for input to ANCHOR outlier pending definition of piping nozzle loads. evaluation. Rerun ANCHOR evaluation to determine adequacy with piping nozzle loads included.
I-HV-ACR-I Caveats            Vibration isolators have no detail from              Design and install a bumper        Note No. I Anchorage          manufacturer. SRT did not observe any restraint      system around the vibration for seismic loads and therefore have designated the  isolation system that is adequate chiller as an outlier.                              for seismic loads.
I-HV-ACR-2 Caveats            Vibration isolators have no detail from              Design and install a bumper        Note No. 1 Anchorage          manufacturer. SRT did not observe any restraint      system around the vibration for seismic loads and therefore have designated the  isolation system that is adequate chiller as an outlier.                              for seismic loads.
1-RPC-111  Seismic Interaction Cabinet with essential rehys is right up against a  Bolt the cabinet at the top to the Note No. I wall of the Control Room and not bolted to it.      adjacent wall.
I-RPC-IV  Caveats Seismic    Cabinet is right next to Cabinet 1-RPST-A, and is    Bolt the cabinet to the adjacent  Note No. 1 Interaction        not bolted to it. There is also a 10 lb duct cover  cabinet 1-RPST-A. Secure or above the unit which could fall on it.              remove the duct cover above.
1-NTR-230  Seismic Interaction Platform grating support beam bears directly on      Bend RTD away from steel.          Note No. 3 RTD. There is no flexibility.
1-NTR-240  Seismic Interaction Platform grating bears directly on RTD, and there is Bend RTD away from steel.          Note No. 3 no flexibility.
14V45C    Capacity vs.        Capacity Spectrum does not envelope Demand          Review piping analyses and        Note No. 4 Demand              Spectrum below about 25 Hz and above 12 Hz.          seismic qualification test data to There are no GERS for this equipment type.          demonstrate that capacity exceeds demand.
14V45A    Capacity vs.        Capacity Spectrum does not envelope Demand          Review piping analyses and        Note No. 4 Demand              Spectrum below about 25 Hz and above 12 Hz.          seismic'qualification test data to There are no GERS for this equipment type.          demonstrate that capacity exceeds demand.
14V45B    Capacity vs.        Capacity Spectrum does not envelope Demand          Review piping analyses and        Note No. 4 Demand              Spectrum below about 25 Hz and above 12 Hz.          seismic qualification test data to There are no GERS for this equipment type.          demonstrate that capacity exceeds demand.
4-38
 
ID          ISSUES                              REASONS                                SRT PROPOSED                    COMMENTS RESOLUTION 17 1-NRV-151 Capacity vs.        ld x Bounding Spectrum does not envelope the          Determine valve response level    Note No. 4 Demand              floor response                                        from piping analysis, and spectrum below about 25 Hz and above 12 Hz.          compare to FOVNERs, or Using a maximum amplification factor of 7 for the    determine capacity based on test floor spectrum, exceeds the FOYERS at all            data and compare to appropriate frequencies.                                          demand.
18 1-NRV-152 Capacity vs.        13 x Bounding Spectrum does not envelope the          Determine valve response level    Note No. 4 Demand              floor response                                        from piping analysis, and spectrum below about 25 Hz and above 12 Hz.          compare to FOVNERs, or Using a maximum amplification factor of 7 for the    determine capacity based on test floor spectrum, exceeds the FOYERS at all            data and compare to appropriate frequencies.                                          demand.
19 1-NRV-153 Capacity vs.        13 x Bounding Spectrum does not envelope the          Determine valve response level    Note No. 4 Demand              floor response                                        from piping analysis, and spectrum below about 25 Hz and above 12 Hz.          compare to FOYERS, or Using a maximum amplification factor of 7 for the    determine capacity based on test floor spectrum, exceeds the FOYERS at aH              data and compare to appropriate frequencies.                                          demand.
20 1-MRV-240 Seismic Interaction Lifting eye4olt on large horizontal motor drive is in Notch curbing (kick plate) to      Note No. 3 close proximity of grating floor.                    preclude"any seismic banging 21 12+ C-3  Anchorage          1) Overhead crane trolley needs to be parked not      1) Trolley should be parked and    1. Note No.2 Seismic Interaction directly over cubicle-crane support also may not be  tied in a position which is not seismically adequate, but OK if trolley is not parked over the blockwall cubicle for 12-over filter room.                                    QC-3.
: 2. Note No.4
: 2) Blockwall enclosure does not appear seismically    2) For Blockwall enclosure, qualified.                                            determined if these walls were included in the IE 80-11
: 3) Anchorage capacity evaluation is required          program, since this is a non-including nozzle loads, due to attached piping being  safety related item.
laterally unrestrained. For one 3 inch line, approximately 40 foot length is unrestrained, and for 3) Piping needs to be evaluated    3. Note No.4 the other, approximately 20 foot length is            to provide nozzle loads to QC-unrestrained.                                        12-3 for evaluation of the anchorage.
4-39
 
ID        ISSUES                        REASONS                                SRT PROPOSED                    COMMENTS RESOLUTION 1-NMO-151 Capacity vs. 15 x Bounding Spectrum does not envelope the        Review piping analysis to          Note No. 4 Demand      Realistic, Median Centered Floor Response Spectra  determine actual response level at frequencies below about 25 Hz and above about    for this valve and compare to 12 Hz. Similarly, assuming an amplification factor  GERS.
of 7 for in-line equipment applied to the floor response spectra, the MOVERS do not envelope below about 25 Hz and above 33 Hz.
I-NMO-152 Capacity vs. 13 x Bounding Spectrum does not envelope the        Review piping analysis to          Note No. 4 Demand      Realistic Median Centered Floor Response Spectra    determine actual response level at frequencies below about 25 Hz and above about    for this valve and compare to 12 Hz. Similarly, assuming an amplification factor  GERS.
of 7 for in@ac equipment applied to the floor response spectra, the MOVNERS do not envelope below about 25 Hz and above 33 Hz.
I-NMO-153 Capacity vs. 13 x Bounding Spectruin does not envelope the      Review piping analysis to          Note No. 4 Demand      Realistic Median Centered Floor Response Spectra    determine actual response level at frequencies below about 25 Hz and above about    for this valve and compare to 12 Hz. Similarly, assuming an amplification factor GERS.
of 7 for inane equipment applied to the floor response spectra, the MOVERS do not envelope below about 25 Hz and above 33 Hz.
1-N SO%1  Capacity vs. 13 x Bounding Spectrum does not envelope the        Determine the response of the    Note No. 4 Demand        floor response spectra below about 25 Hz and        valve from analysis of the piping above about 12 Hz. Also, the SOVWERS do not        and compare to SOVNERS.
envelope the floor response spectra using an amplification factor of 7 below about 4 Hz and above about 20 Hz.
26 I-NS042  Capacity vs. 15 x Bounding Spectrum does not envelope the      Determine the response of the    Note No. 4 Demand        floor response spectra below about 25 Hz and        valve from analysis of the piping above about 12 Hz. Also, the SOVWERS do not        and compare to SOVNERS.
envelope the floor response spectra using an amplification factor of 7 below about 4 Hz and above about 20 Hz.
4-40
 
ID        ISSUES                              REASONS                                  SRT PROPOSED                    COMMENTS RESOLUTION 27 I-NSO43  Capacity vs.        15 x Bounding Spectrum does not envelope the          Determine the response of the      Note No. 4 Demand              floor response spectra below about 25 Hz and          valve from analysis of the piping above about 12 Hz. Also, the SOVNERS do not            and compare to SOVNERS.
envelope the floor response spectra using an amplification factor of 7 below about 4 Hz and above about 20 Hz.
28 1-NSO44  Capacity vs.        15 x Bounding Spectrum does not envelope the          Determine the response of the      Note No. 4 Demand              floor response spectra below about 25 Hz and          valve from analysis of the pipmg above about 12 Hz. Also, the SOVNERS do not            and compare to SOVNERS.
envelope the floor response spectra using an ampliTication factor of 7 below about 4 Hz and above about 20 Hz.
29 1-VDAB-1  Seismic Interaction There is a fire extinguisher hung on the side of the  Support the fire extinguisher      Note No.2 rack on a very short hook. The SRT judged that        more securely.
the fire extinguisher could fall off the hook and possibly rupture.
30 1-V DAB-2 Seismic Interaction There is a fire extinguisher hung on the side of the  Support the fire extinguisher      Note No.2 rack on a very short hook. The SRT judges that the    more securely.
fire extinguisher could fall off the hook and possibly rupture.
31 1-A 11    Seismic Interaction 1. The unsecured shear panel between cabinets 1-      1. Weld the back (west edge)    of 1. Note No.3 A9 and 1-AIO can lift and then strike the embedded    the base of the shear panel to steel, possibly causing relay chatter. Resolve by      existing embedded steel.
welding to embedded steel.                            2. Remove or more tightly          2. Note No.2
: 2. There are 2 step ladders chained to the wall in  secure the ladders.
front of the cabinet. While they are currently chained tight enough not to hit the cabinet, they don't miss by much (I inch - 2 inch) and can easily be rechained so that they would hit.
 
ISSUES                              REASONS                                SRT PROPOSED                    COMMENTS RESOLUTION 32 1-A 13    Seismic Interaction 1. The unsecured shear panel between cabinets 1-      1. Weld the back (west edge)    of 1. Note No.3 A9 and 1-AIO can lift and then strike the embedded    the base of the shear panel to steel, possibly causing relay chatter. Resolve by    existing embedded steel.
welding to embedded steel.                            2. Removed or more tightly        2. Note No.2
: 2. There are 2 step ladders chained to the wall in  secure the ladders.
front of the cabinet. While they are currently chained tight enough not to hit the cabinet, they don't miss by much (I inch- 2 inch) and can easily be rechained so that they would hit.
33 1-.RPSX-A Seismic Interaction 1-RPSX-A contains essential relays. It is bolted to  Bolt 1-RPSX-A to 1-RPST-A.        Note No. 1 the adjacent I-RPS-A, but is not bolted to the adjacent I-RPST-A.
34 I-RPSX-B  Seismic Interaction 1-RPSX-B contains essential relays. It is bolted to  Bolt 1-RPSX-B to 1-RPST-B.        Note No. 1 the adjacent 1-RPS-B, but is not bolted to the adjacent 1-RPST-B.
35 14G      Caveats            Recorders I-MR-17,18,19(0 can slide out. They        Secure the recorders so that they  Note No. 1 latch once they slide out almost their entire length, cannot slide out more than about at that point the SRT judges that they are            half their length without being vulnerable to vertical forces.                        unlatched in some manner.
36 1-LLS-120 Anchorage          The four instruments 1-LLS-120, 121, 122 and 123      Due to the light weight of        Note No.2 are mounted on a stanchion bolted to the floor by    switches (natural frequency 10 three I/2 inch wedge couplings instead of four. This  Hz) the SRT judge that item was designated as an outlier because one of the  remaining three bolts were four bolts was not present.                          adequate and that no operability concern existed (maximum weight of total assembly supported is 150 lbs) SQUG Action Item  &#xb9;  41 was written so this missing anchor would be installed.
 
ID        ISSUES                      REASONS                                    SRT PROPOSED                  COMMENTS RESOLUTION 37 1-LLS-121 Anchorage    The four instruments 1-LLS-120, 121, 122 and 123      Due to the light weight of        Note No.2 are mounted on a stanchion bolted to the floor by    switches (natural frequency 10 three 1/2 inch wedge couplings instead of four. This  Hz) the SRT judge that item was designated as an outlier because one of the  remaining three bolts were four bolts was not present.                          adequate and that no operability concern existed (maximum weight of total assembly supported is 150 lbs) SQUG
                                                                                              &#xb9; Action Item 41 was written so this missing anchor would be installed.
38 1-LLS-122 Anchorage    The four instruments 1-LLS-120, 121, 122 and 123      Due to the light weight of      Note No.2 are mounted on a stanchion bolted to the floor by    switches (natural frequency 10 three I/2 inch wedge couplings instead of four. This  Hz) the SRT judge that item was designated as an outlier because one of the 'emaining three bolts were four bolts was not present.                          adequate and that no operability concern existed (maximum weight of total assembly supported is 150 lbs) SQUG
                                                                                              &#xb9; Action Item 41 was written so this missing anchor would be installed.
39 1-LLS-123 Anchorage    The four instruments 1-LLS-120, 121, 122 and 123      Due to the light weight of      Note No. 2 are mounted on a stanchion bolted to floor by three    switches (natural frequency 10 1/2 inch wedge couplings instead of four. This item  Hz) the SRT judge that was designated as an outlier because one of the four  remaining three bolts were bolts was not present.                                adequate and that no operability concern existed (maximum weight of total assembly supported is 150 lbs) SQUG
                                                                                              &#xb9; Action Item 41 was written so this missing anchor would be installed.
I%PS-314  Other        Screws attaching the component to the mounting        The missing hardware should be  Note No. 3 plate (one screw is missing the nut, the second        installed and loose hardware screw is missing and the third one is loose).          tightened.
 
ID                ISSUES                                  REASONS                              SRT PROPOSED                      COMMENTS RESOLUTION 41    1-BA            Caveats                Taylor Strip Chart Recorder on 1-BA can slide out,  Secure the recorder so that it    Note No. 1 it is not secured.                                  cannot slide out without being unlatched.
42    1-RPS-A        Caveats                1-RPS-A contains essential relays. On one side 1-  Anchor 1-RPS-A to the adjacent. Note No. 1 Seismic Interaction    RPS-A is bolted to the adjacent 1-RPSX-A, but on    r/c wall, and attach I-RPST-A to the other side it is hard up against (but not      I-RPC.
attached) a reinforced concrete (r/c) wall. Also inside the same assembly 1-RPST-A and I-RPC are not bolted together.
43    1-RPS-B        Caveats                1-RPSX-B which is in the same assembly as 1-RPS-    Attach 1-RPSX-B to 1-RPST-B.      Note No. 1 B is not bolted together to 1-RPST-B.
44    1-BATT-AB      Caveats                Batteries just over 10 years old.                    Evaluate the batteries to        This item has been determine that they are          resolved.
seismically adequate since they are greater than 10 years old.
45    1-BATTED        Caveats                Batteries just over 10 years old.                    Evaluate the batteries to        This item has been determine that they are          resolved.
seismically adequate since they are greater than 10 years old.
46    1-DGCD          Seismic Interaction    Overhead pendant florescent light is free to swing  Restrain the light so it will not Note No. I into the panel. Since the panel contains essential  impact the panel.
relays (HFA, etc.) the panel is an outlier, although the impact force on the panel will be minor.
47    I-TFP          Seismic Interaction    The panel is right up against a wall and contains    The panel should be bolted to    Note No. 1 Anchorage              essential relays. The panel can rattle against the  the wall at the top. This wiH wall, which violates Interaction Caveat &#xb9;2. The      resolve both outlier issues.
anchorage is only in the pad above the base concrete.
Notes ~Aliesbte to Comments No. 1. This item wiH be implemented under a design change.
No. 2. This item will be implemented by plant maintenance under a job order.
No. 3. This item has been corrected and/or resolved.
No. 4. This item will be resolved by further evaluation and/or analysis.
 
e 0
 
Table 4-6 Cook Nuclear Plant Unit 2 Outliers for Class of 21 Equipment Reason, SRT Proposed Resolution, Comments ID          ISSUES                            REASONS                                    SRT PROPOSED                      COMMENTS RESOLUTION 2-MRV-154    Other            At the time of the walkdown (during      a plant outage) Replace the missing packing nut. Note No. 3 one  of the packing nuts on this valve was missing.
2-DGAB-X    Seismic          Interaction issues are chain which is restrained but    Restrain the chain and secure      Note No. 2 Interaction      could still swing into cabinet and overhead pendant      overhead light.
lights.
2-DGCD-X    Seismic          Interaction issues are:                                  Secure the chain and overhead      1. Note No. 1 Interaction      1. Chain which is restrained but could still swing into  light.
cabinet
: 2. Overhead pendant lights hung on open hooks.                                                2. Note No.2 4 2-T21A      Caveats          Cabinet sections 2-T21A8 and 2-T21A9 are not              Bolt Sections 2-T21A8 and 2-        Note No. 1 Seismic          bolted together in the front. Switchgear assembly is      T21A9 together and bolt the Interaction      right next to Cabinet 2-ABLV-B and not bolted            assembly and 2-ABLV-B together.                                                together.
5 2-T21D      Seismic          Switchgear assembly is right next to the 2-ABLY-A        Bolt the assembly and 2-ABLY-A      Note No. 1 Interaction      relay panel and not bolted together.                      together.
6 2-QT-106-AB1 Seismic          If the vibration isolators on, the non-safety exhaust    The SRT of George Thomas and        Note No. 3 Interaction      fan, above the pumps, fail, the exhaust fan could faH    Satyan Sharma werc able to on the transfer pumps. This is an interaction issue      inspect the fan in great detail due and'needs evaluation.                                    to the erection of scaffolding.
This inspection resulted in the conclusion that although the fan could jump off the vibration isolators during an earthquake the supporting structure (base frame, rod hangers, etc.) would preclude it from falling. The fan was large enough that it cannot slip through the support structure.
 
ID          ISSUES                        RE AS NS                                  SRT PROPOSED                    COMMENTS RESOLUTION 12-PP-31S  Caveats      Should check inlet and outlet pipe nozzle loads        Define piping nozzle loads for      Note No. 4 Anchorage    piping is laterally unrestrained. Pump is classified as input to ANCHOR evaluation.
an outlier pending definition of piping nozzle loads. Rerun Anchor evaluation including piping nozzle loads.
2-AFWX      Seismic      Overhead pendant lights hung on open hook.              Secure the light.                    Note No. 1 Interaction 2+T-106-AB2 Seismic      If the vibration isolators on the non-safety exhaust    The SRT of George Thomas and        Note No. 3 Interaction  fan, above the pumps, fail, the exhaust fan could fall  Satyan Sharma were able to on the transfer pumps. This is an interaction issue    inspect the fan in great detail due and needs evaluation.                                    to the erection of scaffolding.
This inspection resulted in the conclusion that although the fan could jump off the vibration isolators during an earthquake the supporting structure (base frame, rod hangers, etc.) would preclude it from falling. Thc fan was large enough that it cannot slip through the support structure.
2-H V-ACR-1 Caveats      Vibration isolators have no detail from manufacturer. Design and install a bumper        Note No. 1 Anchorage    SRT did not observe any restraint for seismic loads      system around the vibration and therefore have designated the chiller as an          isolation system that is adequate outlier.                                                for seismic loads.
2-H V-ACR-2 Caveats      Vibration isolators have no detail from manufacturer. Design and install a bumper        Note No. 1 Anchorage    SRT did not observe any restraint for seismic loads,    system around the vibration and therefore have designated the chiller as an        'isolation system that is adequate outlier.                                                for seismic loads.
2-H V-AES-1 Caveats      Embedments for the 5/8 inch non<hell anchors are        Perform more investigation with    Note No. 4 Anchorage    at or below some of the minimum embedments of            regard to the type of bolt, and its the GIP from several anchorage types. This              capacity for the installed equipment item is being designated as an outlier        embedment.
because of the embedment issue. The bounding calculation for 1-HV-AES-1 indicated a relatively small margin of 1.18.
446
 
ID          ISSUES                        REASONS                                  SRT PROPOSED                    COMMENTS RESOLUTION 2-H V-AES-2 Caveats      Bolt embedments for 5/8 inch expansion anchors are    Perform more investigation with    Note No. 4 Anchorage    very short (at or below some of the minimum            regard to the type of bolt, and its embedments for several anchor types in the GIP).      capacity for the installed This equipment item is being designated as an          embed ments.
outlier due to the embedment issue. The bounding calculation for I-HV-AES-I indicated a relatively small margin  of 1.18.
2-TFP      Seismic      Some Debris has worked its way into the gap            The debris be removed between      Note No. 1 Interaction  between the panel and the wall. It is postulated that  the wall and panel and that the Anchorage    the panel can rattle against this debris during a      panel be attached to the wall at seismic event, which violates Interaction Caveat P2. the top.
The anchorage is only in the pad above the base concrete.
2-RPC-I    Seismic      2-RCP-I is too close to the wall and can potentially  Bolt the cabinet at the top to the  Note No. 1 Interaction  pound against it during an earthquake. Also, fire      adjacent wall. Also, either move extinguisher 633A-32CO2 which is on the concrete      the fire extinguisher or put it on wall about 25 inch from 2-RPC-I, can fall off its      a longer hook.
small hook and impact 2-RCP-I, and discharge.
2-RPC-II    Seismic      2-RCP-II is too close to the wall and can potentially  Bolt the cabinet at the top to the  Note No. 1 Interaction  pound against it during an earthquake.                adjacent wall.
2-RPC-III  Seismic      2-R P-III is too close to the wall and can potentially Bolt the cabinet at the top to the  Note No. 1 Interaction  pound against it during an earthquake.                adjacent wall.
2-RPC-IV    Caveats      Cabinet 2-RCP-IV is right next to Cabinet 2-RPST-      Bolt cabinet 2-RCP-IV to the        Note No. 1 A, and is not bolted to it. Cabinet 2-RCP-IV          adjacent Cabinet 2-RPST-A.
contains essential relays.
2-MRV-230  Seismic      Tube off o hydraulic controller on piston is bearing  Relocate Tube.                      Note No. 2 Interaction  on railing. May lack sufficient flexibility.
 
ID        ISSUES                        REASONS                                  SRT PROPOSED                      COMMENTS RESOLUTION 20 12-HE-25A Anchorage    1) Component is supported    off shell of much larger 1) Need    to get physical data on Note No. 4 Seismic      (about 4.0 feet) diameter tank 12-TK-148.              12-TK-148 tank to determine        (Currently under evaluation; Interaction  Information required to evaluate this support          anchorage adequacy.                to be isolated from the flow condition is presently unavailable.                                                      path)
: 2) Obtain nozzle loads to use in
: 2) Inlet and outlet piping to condenser have large    evaluating condenser anchorage.
heavy central valves with no lateral restraint. Nozzle loads are presently unavailable.                      3) Relocate valve to provide sufficient clearance.
: 3) RRV-248 valve is touching    3/4 inch to 5/8 inch tubing line coming from the bottom of the tank supporting condenser. Should have 1 inch gap.
21 24V45A    Capacity vs. 15 x Bounding Spectrum does not envelope the          Review piping analyses and        Note No.4 Demand        Floor Response Spectrum below about 25 Hz and          seismic qualification test data to above about 12 Hz. There are no GERS for relief        demonstrate capacity exceeds valves.                                                demand.
24V45B    Capacity vs. 15 x Bounding Spectrum does not envelope the          Review piping analyses and        Note No. 4 Demand        Floor Response Spectrum below about 25 Hz and          seismic qualification test data to above about 12 Hz. There are no GERS for relief        demonstrate capacity exceeds valves.                                                demand.
24V45C    Capacity. vs. 15 x Bounding Spectrum does not envelope the          Review piping analyses and        Note No. 4 Demand        Floor Response Spectrum below about 25 Hz and          seismic qualification test data to above about 12 Hz. There are no GERS for relief        demonstrate capacity exceeds valves.                                                demand.
2-NRV-151 Capacity vs. 15 x Bounding Spectrum does not envelope Floor        Review piping analysis to          Note No. 4 Demand        Response Curve below about 25 Hz and above 12          determine actual response level Hz. Using an amplification factor of 7 for in-line    for this valve to establish equipment results in the demand spectrum exceeding    demand, and compare to FOV-the FOYERS        at aH frequencies.                  GERS.
 
ID        ISSUES                        REASONS                                  SRT PROPOSED                  COMMENTS RESOLUTION 2-NRV-152 Capacity vs. 13 x Bounding Spectrum does not envelope Floor          Review piping analysis to        Note No. 4 Demand      Response Curve below about 25 Hz and above 12          determine actual response level Hz. Using an amplification factor of 7 for in-line      for this valve to establish equipment results in the demand spectrum exceeding      demand, and compare to FOV-the FOYERS at all frequencies.                          GERS.
26 2-NRV-153 Capacity vs. 15 x Bounding Spectrum does not envelope Floor          Review piping analysis to        Note No. 4 Demand      Response Curve below about 25 Hz and above 12          determine actual response level Hz. Using an amplification factor of 7 for in-line      for this vahe to establish equipment results in the demand spectrum exceeding      demand, and compare to FOV-the FOVCxERS at all frequencies.                        GERS.
27 2-MRV-152 Other        Valve operator was missing during first walkdown        Per DC Cook Plant personnel      Note No. 3 (10-2993) and was still missing during a subsequent    (R. Leonard), the actuator for 2-walkdown 3/ 14/94.                                      MRV-152 was removed to replace a broken actuator on valve 2-DCR-304 (Ref. A/R A000091). A new actuator had to be ordered for 2-MRV-152 (Activity 3 of Job Order C8549).
The new actuators were received at the plant just prior to March 18, 1994.
2-BA      Caveats      Recorder 2-MRS        on 2-BA can slide out, it is not  Secure the recorder so that it    Note No. 1 secured                                                cannot slide out without being unlatched.
29 2-RPS-A  Seismic      2-RPS-A contains essential relays. One side, 2-RPS-    Anchor 2-RPS-A to the adjacent    Note No. 1 Interaction  A is bolted to the adjacent 2-RPSX-A, but on the        r/c wall.
other side, it is hard-up against (but not attached to) an r/c wall 30 2-RPSX-A  Seismic      2-RPSX-A contains essential relays. It is bolted to    Bolt 2-RPSX-A to 2-RPST-A.        Note No. 1 Interaction  the adjacent 2-RPS-A, but is not bolted to the adjacent 2-RPST-A..
31 2-RPSX-B  Seismic      2-RPSX-B contains essential relays. It is bolted to    Bolt 2-RPSX-B to 2-RPST-B.        Note No. 1 Interaction  the adjacent 2-RPS-B, but is not bolted to the adjacent 2-RPST-B.
 
ID        ISSUES                        REASONS                                  SRT PROPOSED                    COMMENTS RESOLUTION 24G        Caveats      Recorders 2-MR-17,18,19/0 can slide out. They          Secure the recorders so that they Note No. 1 latch once they slide out ahnost their entire length,  cannot slide out more than about at that point the SRT judges that they are vulnerable  half their length without being to vertical forces                                    unlatched in some manner.
33 2-NMO-151  Capacity vs. 13 x Bounding Spectrum does not envelope the          Review piping analysis to        Note No. 4 Demand      Realistic Median Centered Floor Response Spectra      determine actual response level at frequencies below about 25 Hz and above about      for this valve and compare to 12 Hz. Similarly, assuming an amplification factor of  GERS.
7 for in-line equipment applied to the floor response spectra, the MOVCzERS do not envelope below about 25 Hz and above 33 Hz.
2-NMO-152  Capacity vs. 13 x Bounding Spectrum does not envelope the          Review piping analysis to        Note No. 4 Demand      Realistic Median Centered Floor Response Spectra      determine actual response level at frequencies below about 25 Hz and above about      for this valve and compare to 12 Hz. Similarly, assuming an amplification factor of GERS.
7 for in-line equipment applied to the floor response spectra, the MOVERS do not envelope below about 25 Hz and above 33 Hz.
35 2-NMO-153 -
Capacity vs. 13 x Bounding Spectrum does not envelope the          Review piping analysis to        Note No. 4 Demand      Realistic Median Centered Floor Response Spectra      determine actual response level at frequencies below about 25 Hz and above about      for this valve and compare to 12 Hz. Similarly, assuming an amplification factor of GERS.
7 for in-line equipment applied to the floor response spectra, the MOVERS do not envelope below about 25 Hz and above 33 Hz.
36 2-BATT-AB  Caveats      Batteries just over 10 years old.                      Evaluate the batteries to        This item has been resolved.
determine that they are seismically adequate since they are greater than 10 years old.
37 2-BATTED    Caveats      Batteries just over 10 years old.                      Evaluate the batteries to        This item has been resolved.
determine that they are seismically adequate since they are greater than 10 years old.
38 2-LSI-3    Seismic      Chain located above the panel is not adequately        Secure the chain.                Note No.2 Interactions secured to the wall.
4-50
 
ID                ISSUES                              RE AS NS                                SRT PROPOSED                    COMMENTS RESOLUTION 39    2-DRY-407          Seismic            Valve is an outlier because it has less than a 2 inch Either restrain the piping so the  Note No. 1 Interactions        clearance to an adjacent R/C Wall. The pipe line is  valve cannot swing or check the rod hung and may swing into the wall.                piping analysis to ensure that the displacement of the valve during a DBE is less than 2 inches.
Notes ~Atiesbte to Comments No. 1. This item will be implemented under a design change.
No. 2. This item wiH be implemented by plant maintenance under a job order.
No. 3. This item has been corrected and/or resolved.
No. 4. This item will be resolved by further evaluation and/or analysis.
4-51
 
Table 4-7 Conimcntary on Equipmcnt Items Meeting the Intent of GIP Caveats Component or Category                                          Commentary Unit  1 and 2 Class 0 Components      There are 50 and 51 cquipmcnt items identified as Class 0 in Unit 1 Generic Intcrprctation                  and Unit 2 respectively. These items were primarily passive and werc similar to items considered as components of class of 21 equipment. For these equipment items thc SRT assessed the potential for seismic damage and made the necessary evaluations.
All these items were at locations in the plant where 15 times the Bounding Spectruni is greater than the floor response spectra where they arc located. Anchorage was evaluated using the GIP criteria.
Unit 1 and 2 Class 21 Tanks and        There are 63 and 58 equipment items identified as Class 21 in Unit Heat Exchangers not covered by the      1 and Unit 2 respectively. Of these tanks and heat exchangers, criteria.                              there were only 20 where the GIP criteria was applicable. The remaining 101 werc evaluated by meeting the intent of the GIP criteria. Anchorage was evaluated using the GIP criteria.
I+T-113KD1                              Each  of these strainers is supported on four legs. Each leg of 1-1+T-113CD2                              QT-113<DI is anchored by one 1/2 inch J4olt anchor, each leg of I-QT-113CD2 is anchored by one 3/8 inch bolt, but the anchor type is unknown. One bolt was broken. One of the 3/8 inch bolts is broken. According to the memo from Jerry A. Reiniger at AEPSC and James Wisniewski at Cook Nuclear Plant Construction, the 3/8 inch bolts appear to have been welded to the 1/2 inch embedded J-bolt. The welding looked questionable.
The SRT believed that even with thc questionable weld, the 3/8 inch bolts are suKcient to carry the tensile load of an unknown expansion bolt (a 0.6 reduction factor) and a further 5 reduction for prying action. The broken bolt was not included in the evaluation.
The ANCHOR analysis was performed for I-QT-113CD1 and 1-QT-113XD2 together, since they are connected by a relatively rigid piping segment.
The minimum embcdmcnt of the 1/2 inch J-bolts for 1+T-113-CD1 is 95 inches and was used for the embedment reduction factor for the Jkolts. The unknown expansion anchor was used for the three 3/8 inch bolts on 1-QT-1 13CD2.
The SRT also judged the bolts may bc subject to prying. Therefore a very conservative 5 reduction factor was applied for prying.
ANCHOR analysis included nozzle loads as specified in the piping analysis nozzle/anchor load summary sheets for the attached piping.
Conservatively assume that the inlet and outlet nozzle loads are distributed between the two strainers, 1-QT-113<DI and CD2, because of the way they are joined. Therefore, the nozzle loads modeled in the ANCHOR analysis are the absolute values of the larger of the two loads specified.
The ANCHOR analysis even with the highest nozzle loads and anchorage reduction factors, shows a high margin of safety (1.6).
4-52
 
Component or Category                                Commentary 1-1 1A        1-21A            Tbe switchgear manufacturer is ITE Imperial. The side to side 1-11B        2-21B            breaker restraint caveat norinally applies to Westinghouse DB-25 1-11C        2-21C            and DB-50 switchgcar assemblies.
1-11D        2-21D Side to side restraint of breaker was judged adequate. Primary 600  VAC Bus Switchgcar        breaker contacts at top are horizontal, secondary breaker contacts at bottom are vertical. Breaker weight estimated to be about 80 lbs.
Frame at bottom of breakers judged sufficiently stiff to withstand earthquake inertia such that secondary contacts will not fail.
1-52BYA          2-52BYA      The switchgcar arc of tbe Westinghouse DB-50 type, which normally 1-52BYB          2-52BYB      applies to the side to side breaker restraint caveat. However, the 1-52RTA          2-52RTA      breaker is supported by two rails that were judged very stiff.
1-52RTB          2-52RTB      Breakers were pulled and pushed sideways (at about 80 lbs. force) and there was not even a slight movement observed.
Reactor Trip Breakers After review of thc seismic test for the unit that included the breakers (although the breaker qualification was not the prime objective of the test) and the load test in the field it was judged that there was no possibility of damaging the secondary contacts in an SSE event. Therefore, caveat 3 was judged acceptable.
On the front, the rail on which the breaker may slide back and forth, is bolted to the side of tbe cabinet. The wheels have a top rcsiraint on the flange of the channel to prevent the wheels from lifting.
1.-PP-7E        2-PP-7E      VP/BS Caveat 2: These pumps are outside the seismic experience 1-PP-7W        2-PP-7W        database because of the long shaft (approximately 45 feet long-Rcf.
Johnston Turbine Pumps H4193-D). However, seismic adequacy is demonstrated by a stress analysis report, which indicates shaft and casing stresses and deflections to be within acceptable limits.
Therefore, the intent of this Caveat is considered to be met by thc SRT.
4-53
 
Component or Category                              Commentary I-DCR-301  2-DCR-301      Small air operated valves or safety valves on lines less than 1 inch.
1-DC R-302  2-DCR-302      The valves were either supported independently and could not 1-DCR-303  2-DC R-303      over tress the lines or the valve was so small the SRT judged that I-DCR-304  2-DCR-304      thc line cannot be overstressed.
1-FRS-257  2-FR S-257 1-FRS-258  2-FRS-258 1-IRV-116  2-IRV-116 1-IRV-136  2-IRV-136 1-IRV-146  2-IRV-146 I-IRV-147  2-IRV-147 I-IRV-148  2-IRV-148 1-IRV-149  2-IRV-149 1-IRV-150  2-IRV-150 1-IRV-160  2-IRV-160 1-MCR-251    2-MCR-251 1-MCR-252    2-MCR-252 I-MCR-253    2-MCR-253 1-MCR-254    2-MCR-254 1-MR V-154    2-MRV-154 1-NRV-101    2-NRV-101 1-NRV-102    2-NRV-102 1-NRV-103    2-NRV-103 1-NRV-104    2-NRV-104 I+RV-150      2+RV-150 14 V-101      24V-101 14V-102      24 V-102 14V-120-AB    24 V-120-AB ISV-120K D    24 V-120<D 14 V-121      24 V-121 14  V-Ill      24 V-140-1 14 V-140-2    24 V-140-2 14 V-15E      24V-15E 1-SV-15W      24 V-15W 1-SV-169E      24V-169E 14V-169W      2-SV-169W 14V-200-AB    24V-200-AB 1$ V-20KD      2$ V-200< D 1$ V-201-AB1    2-SV-201-AB1 14V-201-AB2    2-SV-201-AB2 ISV-201<D I    2$ V-201< D1 14V-201< D2    2$ V-201< D2 14V46          24 V-66 1$ V%7-I      24 V%7-I 14 V%7-2      24 V%7-2 14 V%7-3      24 V%7-3 14V-79-AB 1    24V-79-AB1 14 V-79-AB2    24V-79-AB2 1$ V-79CD I    2$ V-79ZD I 14V-79K D2      2$ V-79ZD2 14 V-96        24 V-96 14V87          24 V-97 14V88N          24V48N 14 V-98S        24 V-98S
 
N        Component or Category                                        Commentary o.
1$ V-200-AB      2$ V-200-AB      FOV/BS Caveat 2: Valve bodies are cast iron. However, since this 1-SV-200C D      2$ V-2004 D      is a prcssure relief valve, the only stress on the body will be due to 1-SV-201-AB1    2$ V-201-AB1      inertia loads on thc body itself (no loads will be imported by the 1$ V-201-A82    2$ V-201-AB2      pipe line). Thc valves weigh    (  10 Ib and the inertia will be low, 1$ V-201KD1      2$ V-201ZD I      such that the stress will be less 020 Fu allowed by this caveat for 1-SV-201< D2    2$ V-201K D2      cast iron valves.
1-HV$GR-MD3 2-HV$GR-MD3            Could not sec motor operator for damper because internal to duct.
1-HV$GR-MD4 2-HV$GR-MD4            Evaluated based on documentation package. Operator is small and 1-HV$GR-MDS 2-HV$GR-MD5            light weight and adequately anchored. Documentation package indicates operator purchased and installed to IEEE 344-75 requirements.
10 Class 14 wall mounted Distribution  The expansion anchors, anchoring most of the distribution panels to Panels, Unit 1 and Unit 2          the wall were in general not accessible for thc bolt tightness check.
Some of these only had four bolts which are not enough bolts to meet the reduced inspection criteria and the concrete strength is 3500 psi and not 4000 psi. Testing these bolts would entail unwiring the components and removing the panel from the wall. The ANCHOR analyses for these light weight panels indicated a margin greater than 10. Most of these panels were also tug tested. When tightness checks could be performed, thc anchors were found to be tight Therefore, the SRT believed the panel anchorage evaluations
                                              ~
met the "intent" of the GIP rcquircmcnts.
I-BC<DI                            The minimum embedmcnt for the J4olts on the Anchor Inspection 1-BCCDZ                            Data Sheet is 9-5/8 inches, slightly below (3/8 inch) the 16 diameter minimum embedment in the GIP. However, due to the high margin of the analysis for 1-BC-AB1 with a smaller 1/2 inch bolt, and the knowledge that the 5/8 inch bolt will have a higher capacity, the SRT judged that the anchorage "met the intent" of the embedment caveat. The anchorage was deemed acceptable based on the calculation for 1-BC-AB1.
12  1ME-150-AB      2&ME-150-AB      Diesel Generator and driver not on same skid, however large 1ME-150CD        2ME-150CD        concrete foundations originate from common floor; differential motion is not a concern.
13  1-D GAB                            Panels contain essential relays.
1-DGCD Panels                            Although Anchorage Inspection Data Sheets indicate greater than 1/4 inch gaps for the anchorage, the panel is not subject to pounding which is the intent of this caveat. These gaps are due to the panel resting on adjacent shim plates. Also due to the size of thc panel the loading will primarily be in shear.
4-55
 
N        Component or Category                                Commentary o.
14  I-TSC-I/047                  The cabinet sits on a 1 inch thick grout pad (appears sound) and is 1-TSC-I/049                  anchored with twelve (12) 3/4 inch Hilti Kwik bolts. The 1-TSC-I/0-13                  ANCHOR analysis showed a margin of 25. Per the anchorage 1-TSC-I/0-15                package, thc bolts werc UT tested and found to be 8D inch long, so Panels                        the embedmcnt length is more than adequate. The bolts could not be tightness tested due to congestion in the cabinet. Per GIP Section C2.10, the Reduced Inspection Alternative cannot be used because the concrete strength is less than 4000 psi, but given the very high margin, the SRT judged the anchorage adequate.
15  124FP-12                      Panel is 36 inches x 42 inches x 90 inches in height, mounted on a 6 Panel                          inch concrete pad. The pad is reinforced with wire mesh.
Using thc GIP rules of neglecting the pad for embedment, the minimum embedment for the 5/8 inch expansion anchors into the base floor concrete is 1-1/8 inch (less than the GIP'allowable)  ~
It was postulated in order for the panel to tip, the concrete pad would have to lift off the floor. To calculate a minimum bolt tension allowable, the minimum g load for uplift of the pad was calculated (only considering the slab weight, and neglecting any cohesion of thc slab to the base concrete). Using the value for zero uplift of the pad a bolt tension allowable vvas determined. The allowable conservative bolt tension was calculated to be 343 lbs, which is much less than the 1660 lb allowable from the GIP for 5/8 inch bolts with full embedments with the appropriate knockdown factors considered.
An ANCHOR Analysis was performed with the reduced tension allowable. The anchorage was adequate with an additional margin of 1.4.
16 1-TK-32      2-TK-32        Anchored with metal straps. The straps were converted to 1-TK-33      2-TK-33        equivalent bolts to meet the GIP criteria. Also, the actual RWST and CST                frequencies and capacity were calculated using the formulas used to generate the GIP tables and charts. The tanks were outside the range of the tables and charts.
17 2-PPBE                      VP/BS Caveat 3: Discharge piping is not laterally restrained in the Vertical Pump                E-W direction in the plane of the discharge nozzle, may overload discharge nozzle. This unit (Unit 2) has snubbers on the inlet piping while Unit 1 pumps did not. Therefore, piping nozzle loads were included in evaluating the pump anchorage. Nozzle loads were obtained from EDS Calculation 406, 9-19-72, for the suction, and from AEPSC Calculation DC-D-ITS-7, 1-1884, for the discharge.
The nozzle loads were within AEP acceptance criteria and the anchorage met GIP acceptance criteria.
4-56
 
<I 0
 
N          Component or Category                                Commentary o.
18 2-PP8W                        VP/BS Caveat 3: Attached piping appears to have no lateral Vertical Puinp                restraint in either direction, only vertical downward support. May overload nozzles. Therefore, piping nozzle loads were included in evaluating thc pump anchorage. Nozzle loads were obtained from EDS Calculation 406/40CX, 9-10-73, for the suction, and from AEPSC Calculation DC-D-2ZTS-5, 1-984, for the discharge. The nozzle loads were within AEP acceptance criteria and the anchorage niet GIP acceptance criteria.
19 2-BCCD I                      There was some uncertainty as to the type of anchorage used for 2-BCCD2                        the Battery Charger. Drawing 12-3436-2 indicates 5/8 inch diameter Battery Chargers              J4olts and Drawing 12-3446B-5 indicates 3/4 inch through bolts.
The ultrasonic evaluation yielded the type of inconclusive results indicative of J4olts. The bolts were ineasured in the field as 5/8 inch diameter.
In either case the anchorage is more than adequate, and the uncertainty is a Quality of Documentation Issue and not a seismic capacity issue which is the "intent" of the USI A46 program. The anchorage is most likely 5/8 inch J-bolts like the Unit 1 CD Chargcrs, based on the measurement and ultrasonic results. The minimum embedment based on the anchor length above concrete is 98/ 16 inches, slightly below (7/16 inch) the 16 diameter minimum embedment in the GIP. However, due to thc high margin of the ANCHOR analysis for a smaller 1/2 inch bolt, and the knowledge that the 5/8 inch bolt will have a higher capacity, the SRT judged that the anchorage "met the intent" of the embedment caveat. The anchorage was deemed acceptable based on the calculation for 2-BC-AB1.
The 3/4 inch throughbolt or 5/8 inch throughbolt would even have a higher capacity.
20  2-Al 1                        This panel contains essential relays.
2-A13 Panel                        There is a door at the far end of the A6-A15 bank that is commonly left open. The door could strike the panel, but the SRT judges the impact is far enough away from the essential relays not to be significant.
There is a fire extinguisher hung on the cnd of A6 that will bang against the cabinet. The SRT judges that it will not affect the essential relays in A11 and A13.
4-57
 
Table 44 Issues Racked Using the SQUG Action Iten Report Not Included as an Outlier Item  Equipment ID                              Reason                                      Comments Number N/A              General Housekeeping; There were loose        Plant Maintenance is reviewing what policy items in the control room loose tool cart,    regarding seismic housekeeping in the loose panel                                    Control Room should be instituted..
I-FLX            One bolt on the panel is loose and should be  Note No. 3 tightened.-
1-NIS-I          Two bolts at bottom of panel were missing      Note No. 2 that bolt the panel to the base frame.
Remaining bolts are sufficient to meet SQUG GIP, however bolts should be replaced.
1-ACRA-2            Halon fire extinguishers should be attached to Note No. 1 2-AC RA-1            the block walls by through bolts. The SRT did not think this was a credible interaction but believed this should be done for consistency and greater assurance.
2-LSI-1            Overhead grating was not completely clamped    Note No.2 in. SRT judged there was sufficient interference from structural members to preclude the grating coming down. Therefore this was not designated as an outlier.
Drawing for anchorage shows wrong              Note No. 3 anchorage type. This was not an outlier since the installed anchorage was adequate.
2-HE-33E            Two bolts attaching the heat exchanger to the  Note No. 2 pump were not in place and appeared broken.
The SRT judged that the connecting pipes were adequate to secure the small exchanger during an earthquake. However, the condition should be repaired.
2-HE-35S            The equipment ID tag was missing.              Note No. 2 1-QP-21            The equipment ID tag was missing.              Note No. 2 4-58
 
Item  Equipment ID                      Reason                                Comments Number 10  2-HFK~      Item not on SSEL. However, during the          Note No. 3 walkdowns it was discovered that the screw that secures the cover for the rear terminal block is missing.
2&R-I    One bolt attaching the bottom of the frame    Note No. 2 2&R-2    angle to the supporting system (near the north end) was missing. The SRT judged the remaining anchorage adequate without this bolt to meet the SQUG GIP criteria, however the bolt should be replaced.
12      2-NSR    A couple of bolts (near the north end)        Note No. 3 attaching the bottom of the base angle to the control panel supporting system were found to be loose. The SRT judged that the anchorage was sufficient with these loose bolts to meet the SQUG GIP criteria, however, the bolts should be tightened.
13  I-HV-AES-2  Anchorage walkdown states anchors were        Note No. 3 expansion bolts. The drawings showed J-bolts. Both types are sufficient to meet SQUG GIP criteria.
14      N/A    This is a generic outlier for both AB and CD  Note No. 1 Unit 1 and 2 Diesel Generator Rooms. The sodium lamps (overhead) will swing and are on open hooks. The hooks should be modified so they are closed.
15  1-QT-113K D2 One  of the four anchor bolts is broken.      Note No. 2 ANCHOR analysis with remaining bolts indicates that the anchorage is adequate.
Therefore this was not declared as an outlier.
However, this bolt should be replaced.
4-59
 
Item  Equipment ID                      Reason                                Comments Number 16  1-MRV-213  Valves 1-MRV-213, 243 have a half inch            Note No. 2 1-MRV-243  copper tubing that is connected to the solenoids on the top of the valve. It is in contact with the grating steel or steel beam.
This was not an interaction outlier because the valve is designed fail safe, and the air line is not required for the valves to perform their safe shutdown function. However, the condition should be modified to increase the clearance.
17    1-QFA-240  Overhead monorail could move during a            Note No. 2 seismic event and hit other equipment in the area if it is not locked in place. Not an outlier since 1-QFA-240 would not be impacted. However, the SRT noted that the monorail should be locked in place when not m use.
18    1-ICM-305      boom of the overhead jib crane was not      Note No. 2 1-ICM-306  secured. It can potentiaHy move and hit nearby conduit during a seismic event. This 24'he    was not an interaction outlier since the valves could not be impacted, however, it is recommended that the boom be secured to the top of the valve enclosure.
19              The 1 inch line connecting the safety valve has  Note No. 2 two missing "U4olts." The SRT judged that the line was adequately supported and therefore this was not declared an outlier.
However, the SRT noted that the "U4olts" should be installed.
4-60
 
0 Item                Equipment ID                                    Reason                                Comments Number 20                    1-TK-33              The RWST supports are rusted and should be      Note No. 3 2-TK-33              cleaned and painted. This was not an outlier because the supports were not deteriorated.
However, the supports should be painted to ensure that the supports do not degrade in the future.
21                      N/A                The clips to which the portable fire            Note No. 2 extinguishers in the Auxiliary Building are mounted, appear to be too small and the possibility exists that the extinguishers could faH off the supports in an earthquake. Larger clips should be installed, as the extinguishers are near safety related equipment.
N/A                A minor modification should      be initiated to Note No. 4 install an isolation valve in the nitrogen header to allow the separation of the nitrogen supply to plant services from the nitrogen supply to the steam generator PORVs. This will allow for the use of the nitrogen storage tanks to operate the PORVs following a seismic event.
23                      N/A                Some of the cables on emergency battery          Note No. 2 packs (for BATLIT's) tie down cables were loose. These cables should be inspected and tightened as appropriate.
Notes ~Aliesbte to Comments No. 1. This item will be implemented under a design change.
No.2. This item will be implemented by plant maintenance under        a job order.
No. 3. This item has been corrected and/or resolved.
No. 4. This item will be resolved by further evaluation and/or analysis.
4-61
 
5.0    TANK AND HEAT EXCHANGER REVIEW 5.1    Sunmiary of Review 5.1.1  Vertical Tai ks The vertical tank review,  as developed in Section 7 of the GIP as part of the resolution of USI A46, is for large flat bottom tanks and consists of a field inspection and an engineering evaluation of those tanks required for safe shutdown. The only tanks applicable to the GIP methodology at Cook Nuclear Plant were the two Condensate Storage Tanks 1-TK-32 and 2-TK-32, and the two Refueling Water Storage Tanks 1-TK-33 and 2-TK-33.
Vertical tanks are addressed in detail in the USI A-46 evaluation because of the occurrence of tank failures in past earthquakes. The procedure used for resolution of USI A46 uses current methods to provide justification of the structural integrity of vertical tanks for the Safe Shutdown Earthquake (SSE).
There are several key technical issues addressed in the tank evaluation regarding the seismic demand on the tank, the seismic capacity of the tank, and the tank's critical components. The purpose of this discussion is to provide the background for the USI A-46 evaluation  of large flat bottom tanks at Cook Nuclear Plant.
The response of a vertical tank to a seismic event is a combination of sloshing fluid and the impulsive mode from fluid-structure interaction. The sloshing of the fluid at the top surface contributes to the overturning moment of the tank as well as producing loads on the tank roof. Adequate freeboard (i.e. height above the water to the tank's roof) should be provided to prevent roof failure. The sloshing effect occurs at very low frequencies and damping values. The impulsive mode includes the tank shell responding to seismic events at frequencies associated with the shell modes of vibration. This response includes the tank and its contents moving together.
S-1
 
The seismic demand on the tank is discussed in terms of the base shear and overturning moment produced at the tank base. Recent technical 'esearch has produced several simplified procedures which develop the response of fluid-filled tanks. The evaluation procedure used for vertical cylindrical tanks at Cook Nuclear Plant includes the sloshing and impulsive modes of the tank.
The USI AXO issues regarding tanks as identified in Ref. 16 are based on the assumption that several tanks in existing nuclear facilities were designed considering that the impulsive mode of the tank shell and fluid were'rigid. In some instances, the original design of the tanks makes this erroneous assumption, which have been the case at Cook Nuclear Plant. The evaluations for USI A46 resolve USI APO issues regarding these tanks.
Attached piping was neglected in computing tank responses.      However, flexibilityof attached piping was checked during the walkdown to judge whether      it could accommodate slight uplift expected in the tank base.
A description of the tanks included in the review for Cook Nuclear Plant and their locations are shown in Table 5-1.
Table 5-1 Vertical Flat Bottom Tanks Reviewed for Cook Nuclear Plant Tank ID No.                                Description 1-TK-33        Refueling Water Storage Tanks; 48 feet-0 inches Diameter x 32 feet-3 inches Height; ASTM A-240 Type 304 Stainless Steel Flat 2-TK-33        Bottom Vertical Tanks 1-TK-32        Condensate Storage Tanks; 52 feet-0 inches Diameter x 34 feet-5 inches; Carbon Steel Flat Bottom Vertical Tank 2-TK-32 5-2
 
5.12  Method of Solution for Vertical Tanks The GIP has established a procedure for evaluating large flat bottom tanks. The GIP procedure was used for the Cook Nuclear Plant USI A46 effort for the evaluation of the tanks at the SSE level.
h As will be discussed in Section 5.2 all four tanks reviewed met the intent of the GIP Methodology. However, the anchorage for the tanks consists of 3/8 inch thick straps that are welded to the tank, and embedded in the concrete 2 feet with a hook at its end. This anchorage is not explicitly covered by the GIP anchorage criteria. The intent of the GIP r
was met by evaluating the strap connection to the tank and embedment in the concrete, showing that the full strength of the strap can be developed. Then the strap was converted to an equivalent bolt.
A description of the procedures outlined in Section 7 of the GIP is as follows. Note, for USI A46, simplifying tables and charts have been developed. In some cases because of the GIP table and chart limitations, these values were calculated directly, using the applicable basis of the GIP tables and charts.
5.13    Determine Tank Seismic Demand The horizontal impulsive mode natural frequency is determined considering the fluid/tank wall interaction. Using this response frequency, the seismic spectral acceleration (using 4%
equipment damping) is determined. Using the determined impulsive mode horizontal spectral response acceleration, the impulsive base shear load and overturning moment for the tank are calculated.
The convective (sloshing) mode natural frequency is also estimated for the 0.3g High Confidence Low Probability of Failure (HCLPF) evaluation. The convective base shear load and overturning moment for the tank are calculated for 05% damping. These values are combined with the corresponding impulsive mode values by square-root-sum-of-the-squares 5-3
 
(SRSS) to obtain the total horizontal seismic responses. The USI A46 procedure considers the effects of the convective mode response by factoring the impulsive mode.
5.1.4  Determine Tank Seismic Capacity The overturning moment capacity is controlled by the compressive buckling capacity of the shell and the bolt holddown capacity. The compressive buckling capacity for the tanks is controlled by "elephant-foot" buckling. The bolt holddown capacity was determined by checking the anchor bolt tensile capacity, and the ability of the anchor connection to the tank to transmit the load from the tank to the anchor bolts. The pullout capacity of the anchor bolts is also checked to determine  if the full tensile capacity of the anchor bolts can be developed.
The overturning moment capacity was then determined as a combination of the limiting shell buckling capacity for compression and the limiting tensile resistance of the anchorage for tension. This value is then compared with the calculated base overturning moment.
The resistance to sliding (shear capacity) was calculated using a friction coefficient of 055 for USI A46. The base shear capacity is compared to the calculated base shear demand.
A check of the height of the sloshing wave was also made and compared to the available freeboard.
For the USI A46 review, normal allowable stresses apply for the tank shell for buckling and for evaluating the anchor bolts and anchor bolt chairs, with the exception of an increase in the allowable weld capacity.
The concrete for the tank foundations is specified to have minimum compressive strength, fof 3500  psi.
5.1$    Horizontal Tanks and Heat Exchangers Horizontal tanks and heat exchangers were evaluated in accordance with the rules and
 
procedures given in Section 7 of the GIP. This section gives the method for how the heat exchanger reviews were to be performed.
The screening evaluation described in this section for verifying the seismic adequacy of horizontal tanks and heat exchangers covers those features of horizontal tanks and heat exchangers which experience has shown can be vulnerable to seismic loadings. The evaluations included the following features:
Check that the anchor bolts and their embedments have adequate strength against breakage and pullout.
Check that the anchorage connection between the anchor bolts and the tank shell (e.g., saddles) have adequate strength.
The SRT reviewed these evaluations to verify that they met the intent of these guidelines.
This review included a field inspection of the heat exchanger, the anchorage connection and the anchor bolt installation. The horizontal tanks and heat exchangers included in the effort that are applicable to the GIP guidance are included in Table 5-2.
The derivation and technical justification for the guidelines utilized for these exchangers were developed specifically for horizontal cylindrical tanks and heat exchangers with support saddles made  of plates. The types of loadings and analysis methods described in this section are considered to be appropriate for these types of horizontal tanks and heat exchangers.
However, a generic procedure cannot cover all the possible design variations. Other design features not covered by the GIP were evaluated using the same procedures and loading conditions as given in Section 7 of the GIP.
The horizontal tanks and heat exchangers which are covered by the screening guidelines in Section 7 of the GIP are cylindrical steel tanks and heat exchangers whose axes of symmetry are horizontal and are suppo:ted on their cur'ved bottom by steel saddle plates.          The screening guidelines are based on the assumption that the horizontal tanks are anchored to 5-5
 
a stiff foundation which has adequate strength to resist the seismic loads applied to the tank.
All the base plates under the saddles are assumed to have slotted anchor bolt holes in the longitudinal direction to permit thermal growth of the tank, except for the saddle at one end of the tank which is fixed. The saddles are assumed to be uniformly spaced      a distance (S) apart, with the two ends of the tank overhanging the end saddles a maximum distance of S/2.
A simple, equivalent static method is used to determine the seismic demand and the capacity of the anchorages and the supports for horizontal tanks and heat exchangers. The screening guidelines contained in Section 7 of the GIP specifically addressed          only the seismic loads due to the inertial response of horizontal tanks and heat exchangers.          If, during the Screening Verification and Walkdown of a tank the Seismic Capability Engineers determined that the imposed nozzle loads due to the seismic response of attached piping maybe significant, then, the GIP requires these loads to be included in the seismic demand applied to the anchorage and supports of the tank. Nozzle loads were included when judged significant by the SRT.
There were several other small tanks and heat exchangers included in the walkdowns.
However, these were not applicable to the GIP calculation methodology. For these items the SRT checked either by calculation or by judgment any potential seismic vulnerabilities.
This included the component anchorage, structural members and connections for tanks on legs, etc.
52      Summary of Results 52.1    Results - Vertical Tanks Results of the USI A46 evaluation for large vertical tanks are summarized                in this subsection. All tanks were  screened to meet the intent of the GIP requirements.
 
522    Results - Horizontal Tanks and Heat Evchangers Results of the USI    A46 evaluation for saddle supported horizontal tanks and heat exchangers are summarized in this subsection. Allhorizontal tanks and heat exchangers met the GIP requirements.
Table 5-2 Horizontal Tanks and Heat Exchangers on at Least Two Saddles Reviewed for Cook Nuclear Plant Heat Exchanger ID                                  Description No.
1-HE-14                  Letdown Heat Exchangers. Small exchangers about 2 feet 2-HE-14                  diameter on 2 saddle supports.
1-HE-1SE                Component Cooling Water CCW Heat Exchangers. About 5 feet 1-HE-15W                diameter, 35 feet long.
2-HE-1SE 2-HE-15W 12-HE-16N                North and South Spent Fuel Pit Heat Exchangers. 3 feet 2 inch 12-HE-16S                Diameter by 22 feet long on two saddle supports 1-QT-107-AB              Emergency Diesel Fuel Oil Day Tanks. Small horizontal tanks 1-QT-107-CD              on two saddles about 4 feet in diameter by 10 feet long.
2-QT-107-AB 2-QT-107-CD 1-QT-115-AB              Emergency Diesel Lube Oil Sump Tanks. Small Horizontal 1-QT-1154" D            tanks on three saddles about 4 feet in diameter by 10 feet long.
2+T-1 15-AB 2-QT-115-CD 5-7
 
6.0    CABLE TRAY AND CONDUIT RACEWAY REVIEW The cable and conduit raceway review was performed as specified in Section 8 of the GIP Revision 2 dated 2/14/92. Raceway systems were walked-down, checked against the Inclusion Rules and Other Seismic Performance Concerns as specified in Section 8.2 of the GIP, and examined for seismic spatial interactions with adjacent equipment and structures.
Representative, worst-case raceway supports were selected and as4uilt. These supports then received a Limited Analytical Review per Section 8.3 of the GIP. Outliers were identified and documented.
The following summarizes the raceway review. The full documentation - including Plant Area Summary Sheets (PASS), Limited Analytical Reviews (LARs), Outlier Seismic Verification Sheets (OSVS), and back-up documentation - is contained in a separate report entitled "USI A-46 Cable Tray & Conduit Raceway Review" (Reference 17).
6.1    Scope  of the Raceway Review The review includes all cable and conduit raceway systems in the plant which could support power, control, or instrumentation wiring for equipment on the Safe Shutdown Equipment List (SSEL). This consists of all raceway systems in both Containments, all areas in the Auxiliary Building, and the safety related areas of the Screen House.
62      Seismic Review Team The Seismic Capability Engineers for the raceway review were I.C. Huang (AEPSC),
Stephen Anagnostis (S&A), and George Gary Thomas (S&A). Mr. Anagnostis and Mr.
Thomas reviewed the Unit    1 Containment. Mr. Huang and Mr. Anagnostis reviewed the Unit 2 Containment and the rest of the plant.
6-1
 
63      Sunnnary of the Plant Area Sunnnary Sheets (PASS)
Table 6-1 summarizes the PASS. The first column contains the ID used to track the PASS, the second column describes the area of the plant covered by the PASS, and the third column lists the LARs (if any) associated with the PASS. The PASS themselves - including the checklist, SRT notes, photographs, and LAR as-builts - can be found in Section 2 of Reference 17.
The four PASS that produced outliers are annotated on the right hand side of Table 6-1.
The annotations contain a brief description of the outliers. The outliers are discussed in more detail below.
6.4    Sunnnary of the Limited Analytical Reviews (LARs)
Table 6-2 summarizes the LARs. The first column lists the ID used to track the LARs, the second column lists the ID of the PASS which generated the LAR. The third column contains the governing interaction value for the LAR, and the fourth column lists the load case that generated the 'governing interaction value. The two LARs that resulted in outliers are annotated on the right hand side of Table 6-2 (note that these are two of the four outliers noted in Table 6-1).
The interaction in Column 3 is the ratio of a computed value to an allowable value, so an interaction of one (1) or less indicates that the value is less than or equal to the allowable.
Two LARs (LAR010 and LAR018) produced interactions slightly above 1, but were judged acceptable by the SRT. Two of the LARs (LAR005 and LAR022) produced interactions significantly above 1, and were declared outliers.
The complete LARs are contained in Section 3 of Reference 17.
6-2
 
65    Sununary of Raceway Outliers The raceway review resulted in four (4) outliers. They are summarized below and fully documented in Section 4 of Reference 17.
RACE003    In this area, two cable trays are rigidly supported from steel columns that are about 15 feet apart. 2x2xl/4 steel angle framing spanning between the columns, supports the cable trays at mid<pan. The LAR (LAR022) showed that the framing alone does not meet design allowables for the deadweight of the cable trays. If the framing is ignored, the trays do not meet the Inclusion Rule requirement of 10 feet between supports.
The outlier is resolved analytically (the resolution is included with the OSVS in Section 4 of Reference 17) by showing that the combination of the trays and the framing can support the required load.
RACE101    A 1 inch conduit in this area is missing several conduit clamps, resulting in an overspan condition. The recommended resolution is to replace the clamps.
The clamps have been replaced; see Cook Nuclear Plant action request A/R 40108046.
RACE103    A common (but not prevalent) rod hanger anchorage detail used is shown below (the SRT referred to it as the "prying-action" detail). In most cases it has an acceptable configuration: L d., and Lz+L, z12 inches. The worst-case configuration was that of LAR005: a heavily loaded hanger (1200 lb deadweight) with L2=10 inches and L, =2 inches. This configuration does not meet the LAR requirements.
F'c v ~  v                            v  v v ~ v v
r I/2  OR 5/8 VNISTRVT NUT AND BOLT IN EMBEODEO UNISTRUT l2x2xl/A or L$ xBxl/A 6-3
 
The recommended resolution to this outlier is to walk4own the plant and document all occurrences of this detail, screen the specific configuration of each detail using an acceptance criteria based on the LAR requirements, and modify those occurrences that do not meet the criteria. The first part of this resolution - the walkdown and screening - has already been implemented and is documented in Section 4 of Reference 17. Fifty occurrences were found and documented, 12 require modification.
RACE130 Two small diameter conduit in this area are unsupported over a length of about 30 feet. The recommended resolution is to support the conduit so that they meet the Inclusioq Rules'equirements. This overspan condition has been corrected.
 
Table 6-1 Summary  of the Plant Area Summary    Sheets (PASS)
PASS No.                                Plant Area                          LAR No.
RACE001  Unit 2 - Containmcnt - Instrument Room RACE002  Unit 2 - Containnient - Accumulators    1, 4                    LAR019 LAR020 RACE003  Unit 2 - Containment Accumulators 2,    3 Area                  LAR021 [1]
thru LAR024 RACE004  Unit 2 - Containmcnt - Annulus                                  LAR025 LAR027 RACE005  Unit 2 - Lower Containment, El 598                              LAR028 RACE006  Unit 2 - Lower Containment, El 625 to 650 RACE007  Unit 2 - Upper Containment RACE100  Unit  1 & 2 - Auxiliary Building, El 573                        LAR017 RACE 101  Unit  1 - Auxiliary Building - Startup Blowdown Flashtank Room & LAR011 [2]
Vcstibulc Area RACE 102  Unit 2 - Auxiliary Building - Startup Blowdown Flashtank Room &  LAR003 Vestibule Area                                                  LAR004 RACE 103  Unit.l - Auxiliary Building - Area around Containment from Az 90 LAR005 [3]
to AZ 360 RACE 104  Unit 2 - Auxiliary Building - Area around Containment from AZ 90 LAR006 to Az 360                                                        LAR007 RACE105  Unit 1 - East Main Stcam Stop Enclosure El 612 and up RACE 106  Unit 2 - East Maui Steam Stop Enclosure El 612 and up RACE107  Unit  1 - Auxiliary Building - Vestibule Area E1 633 and E1 650 RACE 108  Unit 2 - Auxiliary Building - Vestibule Area El 633 and El 650 RACE109  Unit  1 - Cable Penetration Area - E1596                        LAR008 LAR009 LAR010 LAR012 RACE110  Unit 2 - Cable Penetration Area - El 596                          LAR016 RACE111  Unit 1- West Main Steam Stop Enclosure El 621 and up RACE 112 Unit 2 - West Main Steam Stop Enclosure El 621 and up 6-5
 
PASS No.                                      Plant Area                            LAR No.
RACE113        Unit  1  - Diesel Generator Rooms RACE114        Unit 2- Diesel Generator Rooms RACE 115        Unit  1  & 2 - Motor Driven  and Turbine Driven Auxiliary Feed Pump Rooms RACE117        Unit 1- 4KV Switchgcar Area                                        LAR013 LAR015 RACE118        Unit 2 - 4KV Switchgear Area                                      LAR018 RACE119        Unit  1  - Cable Vault                                            LAR014 RACE 120        Unit 2 - Cable Vault RACE 121        Unit  1  & 2- Control Room Air Conditioning    and Computer Rooms RACE 122        Unit  1  & 2 - UPS Inverter Room    and Battery Room RACE 123        Unit  1  & 2 - Screen House RACE 124        Unit 1 & 2 - Auxiliary Building El 650 RACE125        Unit 1 & 2 - Auxiliary Building El 609                            LAR001 RACE 126        Unit 1 & 2 - Auxiliary Building El 633 RACE 127        Unit 1 & 2 - Auxiliary Building El 587 RACE128          Unit 1 & 2 - Control Room RACE 129        Unit  1  - Containmcnt - Outside Crane WaH El 598 (Annulus)
RACE 130        Unit  1  - Containment - Outside Crane Wall El 609438 RACE131          Unit 1 - Containment - Inside Crane Wall El 598 (Lower            LAR030 Containment)
RACE 132        Unit 1 - Containment - Inside Crane Wall El 62(850 (Lower Containment)
RACE  133        Unit  1  - Containment - Inside Crane Wall Above El 650 (upper    LAR031 Containmcnt)                                                      LAR032
[1]    Outlier due to LAR022
[2]    Outlier due to small diameter conduit ovcrspans.
[3]    Outlier due to LAR005
 
Table 6-2 Sunimary of The Limited Analytical Reviews (LARs)
LAR Number      PASS Nuniber          Interaction Coefficient Controlling Load Case LAR001          RACE 125                    0.68                  3DL LAR002        (Not Used)
LAR003          RACE 102                    050                    DL LAR004          RACE102                      029                    DL LAR005          RACE 103                                          3DL [I]
LAR006          RACE 104                    0.76                  3DL LAR007          RACE 104                    0.81                    DL LAR008          RACE 109                    0.94                    DL LAR009          RACE109                      0.85                    LL LAR010          RACE109                      1.05                    DL LAR011          RACE101                                              LL LAR012          RACE 109                    0.45                    DL LAR013          RACE 117                    0.72                    DL LAR014          RACE 119                    0.93                  3DL LAR015          RACE117                      0.84                    DL LAR016          RACE110                      0.79                    LL LAR017          RACE 100                    0.70                    DL LAR018          RACE 118                                            3DL LAR019.          RACE002                      0.33                    DL LAR020          RACE002                      0.67                    DL LAR021          RACE003                      022                    DL LAR022          RACE003                      1.70                  DL P]
LAR023          RACE003                      0.90                    DL LAR024          RACE003                      025                    DL LAR025          RACE004                      055                    LL LAR026          (Not Used) 6-7
 
LAR Number                PASS Number          Interaction Coefficient Controlling Load Case LAR027                      RACE004                    0.96                  3DL LAR028                      RACE005                    0.14                    DL LAR029                    (Not Used)
LAR030                      RACE 131                    loiv                    DL LAR031                      RACE 133                    0.19                    DL LAR032                      RACE133                    0.68                    DL DL          Dead Load Check 3DL          3x Dead Load (Vertical Load Check)
LL          Lateral Load Check RF          Rod Fatigue Check
[I]    Outlier due to "prying-action" detail P]    Outlier due to hanger construction 6-8
 
7.0    PLAN FOR ADDRESSING UNRESOLVED OUTLIERS AND OPEN ISSUES Tables 4-5 and    44 identify all outliers for  Class of 21 equipment, Section 65 identifies outliers for the cable tray and conduit, and Table 4-8 lists items requiring further review or action, but not included as an outlier.
Some of the outliers have been resolved and modifications have been implemented at the plant. The outliers and other items identified have been evaluated against the current licensing and design basis and no deviations or operability concerns were identified. AEPSC is continuing to evaluate these issues with the intent to resolve all of them and implement modifications  if required.
It is currently AEPSC's intent  to close out all remaining issues before the conclusion of the refueling outages following the next three operating cycles.
7-1
 
==8.0    CONCLUSION==
S AND RESULTS Cook Nuclear Plant has developed and implemented a program to satisfy the requirements of the USI A46 seismic evaluation. The program implemented concentrated on verifying the seismic adequacy of electrical and mechanical equipment, large tanks, cable tray and conduit raceway systems. The screening and verification walkdowns verified that the Cook Nuclear Plant equipment, tanks, distribution systems and structures are able to withstand the design basis SSE and perform their safe shutdown function.
There were several walkdowns performed from the summer of 1991 through the fall of 1995.
Screening Evaluation Work Sheets and Seismic Verification Data Sheets were developed for each equipment item on the equipment list. The SVDS contain walkdown observations as well as screening results and are contained in Appendix C. Seismic Evaluation Work Sheets for all equipment items on the equipment list were developed.        The work sheets consisted of general descriptions of the equipment, and walkdown observations.
There were 47 and 39 outliers for Class of 21 equipment items in Unit          1 and Unit 2 respectively. Although there were several outliers, no outliers resulted in equipment inoperability. Open issues will be resolved    as noted in Section 7.0.
There were four outliers identified in the cable tray and conduit raceway walkdowns and two due to the LAR calculations. All have been resolved except for one that will require minor plant modifications.
8-1
 
==9.0 REFERENCES==
: 1. NRC Regulatory Guide 1.100, "Seismic Qualification of Electrical Equipment for Nuclear Power Plants," March 1976.
: 2. IEEE 344-1975, "IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations," 1975.
: 3. USNRC Standard Review Plan Section 3.10, "Seismic and Dynamic Qualification of Mechanical and Electrical Equipment," NUREG4800, July 1981.
: 4. Generic Letter 8742, "Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A46," USNRC, Washington, D.C., February 19, 1987.
: 5.  "Generic Implementation Procedure (GIP), for Seismic Verification of Nuclear Plant Equipment," Revision 2, February 1992, Seismic Qualification Utility Group.
: 6. USNRC, Supplement    1 to Generic Letter (GL) 8742, that transmits "Supplemental Safety Evaluation Report No. 2 (SSER No. 2) on SQUG Generic Implementation Procedure, Revision 2, as Corrected on February 14, 1992 (GIP-2)," May 22, 1992.
: 7. USAEC Regulatory Guide 1.60, "Design Response Spectra for Seismic Design of Nuclear Power Plants," December 1973.
: 8. USAEC Regulatory Guide 1.61, "Damping Values for Seismic Design of Nuclear Power Plants," October 1973.
: 9. USAEC, TID-7024, "Nuclear Reactors and Earthquakes," August 1963.
9-1
: 10. G.W. Housner,      "Design of Nuclear Power    Reactors  Against Earthquakes,"
Proceedings of the Second World Conference on Earthquake Engineering, Vol. 1, Japan 1960, pg. 133, 134, and 137.
: 11. ANSI/IEEE 344-1971, IEEE Guide for Seismic Qualification of Class    1  Electric Equipment for Nuclear Power Generating Stations, Approved September    16, 1971.
: 12. "The GIPPER, User's Manual," Stevenson and Associates, April 1993.
: 13. SSRAP Report, "Use of Seismic Experience Data to Show Ruggedness of Equipment in Nuclear Power Plants," Senior Seismic Review and Advisory Panel, published by Sandia National Laboratory, Report DE92-019328, June 1992,
: 14. EPRI NP-5228, "Seismic Verification of Nuclear Plant Anchorage, Volume 1:
Development of Anchorage Guidelines; Vol. 2: Anchorage Inspection Workbook,"
URS Corp. /John A. Blume & Associates, Prepared for Electric Power Research Institute, Palo Alto, CA, Rev. 1, June 1991.
: 15. AEPSC Report No. MT2, Rev. 0, "Summary Report of Fundamental Frequencies Determined By In4itu Transfer Function Modal Testing at Cook Nuclear Plant,"
approved August 10, 1994.
: 16. NUREG/CR-3480, "Value/Impact Assessment'for Seismic Design Criteria USI A-40," Lawrence Livermore National Laboratory, August 1984.
: 17. Stevenson  8c  Associates Report, "USI  A46 Cable Tray and Conduit Raceway Review," November 1995.
9-2
 
APPENDIX A RESUMES OF SEISMIC EVALUATION PERSONNEL (PER SQUG GENERIC IMPLEMENTATION PROCEDURE, SECTION 2}
 
9990 iC/GGT/diskS GEORGE a. TIIO~iIAS EDUCATION B.S. - Civil Engineering - Purdue University, 1976 M.S. Civil Engineering - Purdue University, 1978 REGISTRATION:
Registered Engineer-in-Training: Indiana Passed Principals and Practices Exam: Texas PROZESSIONAL HISTORV:
Stevenson & Associates, Cleveland, Ohio, Project Engineer, 1982 - Present Cleveland State University, Cleveland Ohio, Engineering Instructor, 1981 - 1987 Davy McKee Company, Cleveland, Ohio, Lead Engineer, 1980 - 1982 Exxon Production Research Company, Texas, Research Engineer, 1978 - 1980 McDermott-Hudson Engineering Con., Engineer/Draftsman, 1976 - 1977 PROFESSIONAL EXPERIENCE:
Mr. Thomas has served as a Project Manager for Stevenson &, Associates on a variety of projects involving the evaluation and qualification of nuclear safety-related structures, equipment and piping. He has been responsible for the detailed seismic analysis, testing and qualification of a variety of mechanical and electrical equipment and piping systems, including the anchorage and support structure evaluations. He has performed analysis of safety-related piping systems subject to extreme loadings of earthquake, tornado wind, and missile impact.
He has performed a failure analysis of a piping system due to water hammer loading. He has performed in-situ modal testing of nuclear components to determine their dynamic characteristics, and to determine structure amplified response spectra.
Mr. Thomas developed a large portion of the Generic'Implementation Procedure, GIP, foi the Seismic Qualification Utilities Group, SQUG, that defined the generic walkdown requirements for USI A-46. Mr. Thomas was a walkdown participant for both the SQUG Zion and Nine Mile Point 1 trial plant walkdowns for SQUG. Mr. Thomas prepared and presented the training modules on the GIP for the SQUG training program, and was one of the Subject Matter Experts for the development of the training program and the training program tapes.
Mr. Thomas was the Project Manager and a Lead Walkdown Engineer on a Seismic Review-Team for the D.C. Cook Nuclear Station Units 1 and 2 for USI A-46, Arkansas Nuclear One 1 and 2 for a combine USI A-46 and Seismic Margins Assessment          for IPEEE, and            'nits Waterford 3, Grand Gulf 1 and V.C. Summer 1 for the Seismic Margins Assessment for IPEEE. In addition, Mr. Thomas was the Project Engineer for the Turkey Point Unit 3 and 4 and St. Lucie Unit 1 aqd 2 USI A-46 and seismic IPEEE efforts using Florida Power 8'c Light's Stevenson end Assoc<ates
 
Utility specific program. Mr. Thomas    was Project Manager and participated on the walkdown for the seismic IPEEE Probabilistic Risk Assessment for Beaver Valley Unit 2. Mr. Thomas as Project Manager for these evaluations is the primary author of the final IPEEE and USI A-46 reports.
Mr. Thomas has developed background material and a seismic criteria document for a utility client for an older nuclear power plant to be used by the utility in seismic evaluations for modifications and additions to plant structures, equipment and piping. He has served as a Project Engineer for a pilot, snubber reduction program for a utility and has provided expert consulting services to another utility for their in-house snubber reduction program.
Mr. Thomas developed program COMPARE which consisted of the assembly of a data base of  nuclear power plant components tha: have been previously seismically qualified. He developed the computer software on an IBM-PC computer to store and retrieve seismic qualification data on these components. The program is used to facilitate seismic qualification of components not previously qualified by comparison to thoie components qualified in the data base.
Mr. Thomas has served as a part time instructor in the School of Civil Engineering and Engineering Technology at Cleveland State University. On the undergraduate level, he has taught Static, Dynamics, Material Science, Structural Analysis and Concrete Design. In the graduate program, he has taught Advanced Steel Design. In all of the teaching assignments he was responsible for developing the course outline, lecture notes, problems and tests.
Mr. Thomas served as Lead Engineer in the Piping Engineering Group of Davy McKee Company. His work consisted of the design supervision and design of piping networks in a number of different petrochemical facilities. His responsibilities comprised the following:
Designing    and analyzing piping networks subjected to thermal, weight, wind, earthquake, and pressure loadings using both manual and computerized techniques.
Design and analysis of pipe supports and pipe support structures.                Preparing specifications for expansion joints, and providing an overall support and expansion joint package. Preparing hydrotest procedures and planning of hydrotest circuits.
Mr. Thomas served      as a Research Engineer in the Offshore Structures Division of Exxon Production Research Company. His work consisted of development of desi'nd analysis procedures for the Guyed Tower, a type of deepwater offshore production platforms. He performed the dynamic, structural, and fatigue analysis necessary for the Guyed Tower design of three proposed structures. He also wrote, revised, and maintained computer programs used in the Guyed Tower analysis and design procedures.
Mr. Thomas served      as an Engineer and Draftsman for Robert W. Crooks Consulting Engineer and McDermott-Hudson Engineering Company.              His work consisted of structural design, drafting, foundation design, railroad layout, and site development for chemical facilities.
GGT 2  of 3 Stevenson an't Assodstcs
: 1. Mr. Thomas, G.G. and Finn, L.D., "A Guyed Tower for North Sea Production,"
Presented at 4th Offshore North Sea Technology Conference in Stavanger, Norway, 1980.
Thomas, G.G. and Starck, R.G., "Overview of SQUG Generic Implementation Procedure (GIP), "Second Symposium on Current Issues Related to Nuclear Power Plant Structures, Equipment, and Piping with Emphasis on Resolution of Seismic Issues in Low-Seismicity Regions, EPRI NP-6437-D Proceedings, May 1989.
: 3. Thomas, G.G. and Starck, R.G., "Overview of SQUG Generic Implementation Procedure (GIP)," Nuclear Engineering and Design, Vol. 123 (1990), Nos. 2Ec3, October (II) 1990, Pgs 225-231.
GGT 3  of3 Stevenson and Assodl its
 
WALTER D JORD J EVIC EDUCATION:
B.S. - Civil Engineering, University of Wisconsin at Madison, 1974 M.S. - Structural Engineering, Massachusetts Institute of Technology, 1976 REGISTRATION:
State of California, State of Wisconsin, Commonwealth of Massachusetts, State of Michigan PROFESSIONAL HISTORY:
Stevenson & Associates, Inc., Vice President and General Manager of the Boston office, 1983 - present URS/John A. Blume & Associates, Engineers, Boston, Massachusetts, General Manager, 1980 - 1983; San Francisco, California, Supervisory Engineer, 1979 - 1980 Impell Corporation, San Francisco, California, Senior Engineer, 1976-1979 Stone & Webster Engineering Corporation, Boston, Massachusetts,              Engineer, 1974- 1976 PROFESSIONAL          EXPERIENCE'r.
Djordjevic founded the Stevenson & Assocjates Boston office in 1983 and serves as Vice President and General Manager of the Boston area office.
Mr. Djordjevic is expert in the area of dynamic qualification of electrical and mechanical equipment.
He has participated in and managed over twenty major projects involving the evaluation and qualification of vibration sensitive equipment and seismic hardening of equipment. As demon-strated by his committee work and publications, Mr. Djordjevic has participated in and contributed steadily to the development of equipment qualification and vibration hardening methodology.
Mr. Djordjevic's previous walkdown experience included all of the SEP plants (8 plants), Nine Mile - Unit1, D C. Cook- Units 1 & 2, the Hanford Reservation Purex facility and the Savannah River Plant Reservation L-Reactor.
Representative projects include overseeing the SEP shake-table testing of electrical raceways, in-situ testing of control panels and instrumentation racks at various nuclear facilities, equipment anchorage walkdowns and evaluations at various nuclear facilities, principal author of the CERTIVALVEsoftware package to evaluate nuclear service valves, and contributing author in
 
the development of the ANCHOR and EDASP software packages commercially distributed by Stevenson & Associates.
Mr. Djordjevic has been involved extensively in the reassessment    of safety-related equipment for commercial nuclear facilities and government U.S. Department of Energy facilities, for which he maintains an active Q-clearance status. He has served on advisory groups and review tea'ms touring older existing nuclear facilities to assess safety and has performed earthquake reconnaissance at such installations following seismic events.
PROFESSIONAL GROUPS:
Member, Institute of Electrical and Electronics Engineers, Nuclear Power Engineering Committee Working Group SC 2.5 (IEEE-344)
Chairman, Ainerican Society of Civil Engineers Nuclear Structures and Materials Committee, Working Group for the Analysis and Design of Electrical Cable Support Systems Member, American Society of Mechanical Engineers Operation, Application, and Components Committee on Valves, Working Group SC-5 WD pg2
 
STEPHEN ANAGNOSTIS EDUCATION:
B.S. - Civil Engineering, Columbia University School of Engineering, 1974 M.S. - Structural Engineering, Massachusetts Institute of Technology, 1976 PROFESSIONAL HISTORY:
Stevenson      & Associates,  Inc., Project Manager,    1983-present URS/John A. Blume & Associates, Enginet.rs, Boston,              Massachusetts,    Project Engineer 1982-1983; Senior Engineer, l980-1982 Charles Stark Draper Laboratory, Cambridge, Massachusetts,              Technical Staff, 1976-1980; Draper Fellow, 1974-1976 PROFESSIONAL EXPERIENCE:
Mr. Anagnostis joined Stevenson & Associates in February 1983 as Projec) Manager of the Boston area    office.
Mr. Anagnostis was extensively involved in both analysis (frequency domain and time domain structural dynamics) and testing (in-situ modal and full-scale shaking-table) at URS/Blume's Boston office. He had lead technical responsibility for a two year program to develop a seismic evaluation criteria for electrical raceway systems at eight of the oldest United States nuclear power stations. This program included the design, supervision, and data analysis of shaking-table tests of full-scale raceway. systems, cyclic/fatigue tests of raceway components, and the development of analytical evaluation techniques incorporating the test results.
C As a member of the technical staff of Charles Stark Draper Laboratory, Mr.Anagnostis was involved in the assessment of space based surveillance (infra-red and radar) and defense systems for the Defense Advanced Research Projects Agency. He was a major author of a software simulation system to assess the capabilities of spaced based optical systems including structural vibrations, control dynamics, and optical performance.
PROFESSIONAL GROUPS:
Committee, Working Group for the Analysis and Design of Electrical Cable Support Systems Member, American Society of Civil Engineers Nuclear Structures and Materials
 
STEPHEN ANAGNOSTIS EDUCATION:
B.S. - Civil Engineering, Columbia University School of Engineering, 1974 M.S. - Structural Engineering, Massachusetts Institute of Technology, 1976 PROFESSIONAL HISTORY:
Stevenson      8  Associates,  Inc., Project Manager,    1983- present URS/John A. Blume. 8 Associates, Engineers, Boston,              Massachusetts,    Project Engineer 1982-1983; Senior Engineer, 1980-1982 Charles Stark Draper Laboratory, Cambridge, Massachusetts,              Technical Staff, 1976-1980; Draper Fellow, 1974-1976 PROFESSIONAL EXPERIENCE:
Mr. Anagnostis joined Stevenson & Associates in February 1983 as Project Manager of the Boston area office.
Mr. Anagnostis was extensively involved in both analysis (frequency domain and time domain structural dynamics) and testing (in-situ modal and full-scale shaking-table) at URS/Blume's Boston office. He had lead technical responsibility for a two year program to develop a seismic evaluation criteria for electrical raceway systems at eight of the oldest United States nuclear power stations. This program included the design, supervision, and data analysis of shaking-table tests of full-scale raceway systems, cyclic/fatigue tests of raceway components, and the development of analytical evaluation techniques incorporating the test results.
As a member of the technical staff of Charles Stark Draper Laboratory, Mr.Anagnostis was involved in the assessment of space based surveillance (infra-red and radar) and defense systems for the Defense Advanced Research Projects Agency. He was a major author of a software simulation system to assess the capabilities of spaced based optical systems including structural vibrations, control dynamics, and optical performance.
PROFESSIONAL GROUPS:
Committee, Working Group for the Analysis and Design of Electrical Cable Support Systems Member, American Society of Civil Engineers Nuclear Structures and Materials
 
99901CVDS l 994'<i)isk4 JOHN D. STEVENSON EDUCATION:
B.S. - Civil Engineering-Virginia Military Institute, 1954 M.S. - Civil Engineering-Case Institute of Technology, 1962 Ph.D.- Civil Engineering-Case Institute of Technology, 1968 RE< GISTRATION:
Commonwealth      of Virginia,  State  of Ohio PROFESSIONAL HISTORY:
Stevenson  Ec Associates, Cleveland, Ohio, President: 1981 - present Structural Mechanics Associates, Cleveland, Ohio, Vice President: 1980 - 1981 Woodward Clyde Consultants, Cleveland, Ohio, Vice President: 1979 - 1980 A.G. McKee Ec Co., Cleveland, Ohio, Vice President: 1976 - 1979 Case Western Reserve University, Cleveland, Ohio, Assoc. Prof.: 1974 - 1976 Westinghouse Electric Co., Pittsburgh, Pennsylvania,. Consultant: 1972 - 1974 University of Pittsburgh, Pittsburgh, Pennsylvania,. Adjunct Professor: 1970 -1972 Westinghouse Nuclear Energy Systems, Manager Structural System Engineering: 1966 -1970 Virginia Military Institute, Assistant Professor: 1957 - 1962 PROFESSIONAL EXPERIENCE:
Since November 1981, Dr. Stevenson has managed and has served as President and Senior Consultant to Stevenson & Associates. The firm specialized in high technology consulting and engineering services associated with failure analysis of structural and mechanical systems; extreme load; and nonlinear, dynamic, probabilistic and high temperature analyses.
His years of expertise include structural and mechanical design and qualification. of nuclear power plant structures and components. He serves on several committees of the ASCE, ASME, ANS, ACI and AISC charged with the development of standards devoted to design of nuclear power stations and 23 years as a structural-mechanical engineer with particular application to structural design, analysis and evaluation of containment structures. A list of nuclear containment related projects which Dr. Stevenson performed or directly supervised. is as follows:
: 1. Developed    seismic design criteria for 5 nuclear containments:  Westinghouse Turnkeys
: 2. Reviewed and approved structural design adequacy from plans and specifications for 5 nuclear power plant containments: Westinghouse Turnkeys
: 3. Quality Assurance audit (technical) of the Tokomak fusion test reactor tritium containment structures to resist seismic loads: U.S. Department of Energy S<evel&oh <<<<4 Assod& tcs
 
JOHN D. STEVENSON Page Two
: 4.      Review and evaluation of the Purex facility structural capabilities at Hanford Plant:
U.S. Department of Energy.
: 5.      Survey and evaluation  of the L reactor containment capabilities for Savannah River Plant: E.I. DuPont
: 6.      Systematic evaluation of the structural capacity    of  a 600  MW Candu reactor containment in Argentina Review of structural adequacy of the nuclear plant containment facilities for the D.C. Cook Nuclear Power Plant: American Electric Power Corporation to include probabilistic determination of ultimate strength capacity of the containment to carry severe accident loads
: 8.      Review of structural adequacy of the nuclear plant containment for the Ft. Calhoun containment to include probabilistic determinations of ultimate strength capacity of the containment to carry severe accident loads
: 9.      Personally performed walkdowns of 12 operating nuclear power plant containments to determine "as is" condition and to recommend up-grade and in-service inspection procedures for VVER-PWR plants PROFESSIONAL GROUPS:
Member, American Society of Civil Engineers, Structural Division Committee on Dynamic Analysis of Nuclear Facilities Chairman, American Society of Civil Engineers, Nuclear Standards Committee Former Chairman, American Society of Civil Engineers, Executive Committee Technical Council Codes and Standards Member, American Concrete Institute, Joint ACI-ASME Committee on Concrete Pressure Retaining Components in Nuclear Service, ASME BPVC-Section III-Div. 2 Former Chairman, American Concrete Institute, Joint ACI-ASME Committee on Concrete Pressure Retaining Components in Nuclear Service, ASME BPVC-Section III-Div. 2, Subgroup on Design of Concrete Containments and Reactor Vessels Member, American Society of Mechanical Engineers, Subgroup on Design of ASME BPVC-Section III-Div. 1 Nuclear Components Subcommittee on Qualification of Mechanical Components in Nuclear Service Chairman, American Society of Mechanical Engineers, Subgroup on Design of Shipping Cask Containments ASME BPVC-Section III-Div. 3 Member, NUPPSCO, American Nuclear Society Committee on Nuclear Power Plant Codes and Standards Member, ANS-2, American Nuclear Society Committee on Site Evaluation; NUPPSCO, American Nuclear Society Committee on Nuclear Power Plant Codes and Standards Chairman, ANS-2.3, American Nuclear Society Committee on Site Evaluation; NUPPSCO, American Nuclear Society Committee on Nuclear Power Plant Codes and Standards, Tornado Criteria Member, AISC, American Institute of Steel Construction Committee on Specifications for Structural Steel in, Safety Class Nuclear, Structures Steveneon and Assodates
 
G. A. Harstead GUNNAR A. HARSTEAD EDUCATION B.S.C.E., Columbia University, New York, 1954 M.S.C.E., Columbia Univexsity, New York, 1962 Ph.D., New York UniverSity, New York, 1966 REGISTRATION:
States of  New  York, New Jersey,  Pennsylvania and Florida PROFESSIONAL HISTORY:
HEA,  Inc., President, (1979-Present)
Soot 6 Harstead Associates, Vice President, (1975-1979)
Stone & Webster, Assistant Chief Structural Eng, (1974-1975)
Burns 6 Roe, Inc., Senior Supervising Civil Eng, (1967-1974)
Westinghouse, Senior Engineer, (1965-1967)
Severud Associates, Structural Engineer, (1959-1963)
Howard Needles, Structural Designer, (1957-1959)
US Navy, Commissioned Officer, (1954-1957)
PROFESSIONAL EXPERIENCE:
Dr. Harstead has  thirty five years experience in structural analysis and design,  mainly in the area of nuclear power.        He has served as a consultant for NRC design audits and site inspections of nuclear power plants. He has developmed design criteria and code requirements for design of nuclear power plant structures and equipment, and served as a leader of expert investigations of structural and mechanical failures.
In his current position as President. of HEA, Inc, Dr. Harsted is responsible for the direction of structural and mechanical eng'ineers, with primary responsibility for design and analysis of nuclear power facilities.
GAH  1
 
G. A. Harstead As a  consultant to the Nuclear Regulatory Commission, Dr. Harstead has performed integrated design inspections at, the Sequoyah,          Byron, Seabrook, River Bend, and Perry nuclear power plants. The inspections included field walkdowns to determine seismic adequacy of mechanical and electrical equipment and distribution systems and structures. He has also conducted independent. design reviews at the Limerick, Clinton, Vogtle, Nine Mile Point, and South Texas nuclear power plants. Here he conducted site visits to validate "as built" and as designed" consistency. Dr. Harstead has also performed structural audits at the Waterford 3, Midland 1 & 2 and Comanche Peak nuclear power plants.
Extensive field walkdowns were performed at Midland to evaluation structural  adequacy.
The  U.S. Department, of Energy contracted with Dr. Harstead as a consultant for the development of the USDOE Criteria for Seismic Analysis for the NPR program.
As Vice President of Soot & Harstead Associates,        Dr. Harstead was responsible for analysis and design of vessels and tanks for Angra (Brazil) nuclear plant; seismic analysis of mechanical equipment, for Aliens Creek and South Texas Nuclear Plants; field erection of post-tensioned concrete parking garage.
As the Assistant. Chief Structural Engineer for Stone & Webster, he managed a group of engineers in the following areas of nuclear power plants (Surry 3,4, and Indian Point 3): Vessels and tanks; pipe stress and pipe supports; pipe rupture analysis; containment analysis and design; Category I structures; seismic evaluation of equipment.
Extensive inspections at Indian Point 53 were performed for the New York Power  Authority.
His work as the Senior Supervising Civil Engineer for Burns & Roe involved analysis and design of Category I structures and for seismic evaluation of equipment and pipe supports.      Projects include TMI g2, Forked River, Laguna Verde, Clinch River, WPPSS 42, Cooper nuclear plants.
At Westinghouse, his responsibilities included the development of criteria and review of design for nuclear projects: Ginna, H.B.
Robinson, Indian Point No. 2, and Point Beach.
Summar of Nuclear Pro'ects Ex erience  Power Com anies & Authorities Indian Point Unit, 52: Seismic analysis and development of instructure response spectra for concrete and steel buildings. Analysis of block GAH  2
 
G. A. Harstead walls for additional seismic loads.
Indian Point 43: Analysis of base plates for pipe supports. Design of structural steel bracing system for service water pump enclosure.
Evaluation of spent fuel pool for cask drop loads.
Angra (Brazil): Analysis and design of safety related air handling systems.
Kori (Korea):    Seismic analysis of air  handling units.
Donald C. Cook: Piping analysis and evaluation of pipe supports and seismic analysis of electric control panels.
Salem: Evaluation of the effects of tornado missile impact on auxiliary feedwater tank. Nonlinear time history analysis of the steam generator snubbers and supports for accident. loads. Specification p=eparation for spent fuel storage racks.
Clinton: Design analysis and detailed fabrication and installation drawings of safety equipment for reactor piping (flow diverters).
Oyster Creek: Analysis of the as-built concrete floor slab and supports for a new heat exchanger. Analysis of the spent fuel storage pool for high density racks and thermal effects. Fuel rack drop analysis on concrete plugs above reactor vessel.      Structural modification of the radwaste Building, Analysis of horizontal structural bracing system.
Analysis of control room panels under missile impact. Evaluation of reinforcement of steel containment penetrations. Design of rigging for the removal and replacement of switchgear. Review of seismic models.
J.A. Fitzpatrick: Analysis of the as-built reactor building mat for additional hydrodynamic loads. Elasto-plastic analysis of the spent fuel pool consolidated fuel loads.
Catawba: Stability  buckling analysis of the steel containment vessel by using BOSOR4 and ANSYS computer programs.
Ranch Seco:    Design and finite element analysis of steel buried diesel fuel tanks.
Waterford III: Structural evaluation of the as-built common mat by using finite element analysis.
Alto Lazio (Italy): Analysis and design of a steel flow diverter to be used in the reactor safety system.
GAH-  3
 
G. A. Harstead Diablo Canyon: Review and assessment of seismic analysis of structures, piping, electrical raceways and HVAC systems and their supports. Field visits were made to verify designs of piping supports and structural supports.
Palisades:    Investigation of temperature effects on the reinforced concrete biological shield wall.
Palo Verde: Review of structural design criteria.
Connecticut Yankee:      Seismic analysis of Aux Feedwater Pumphouse including soil structure interaction    and interaction with Containment.
PROFESSIONAL GROUPS:
American Society of Civil Engineers Chi Epsilon American Nuclear Society American Concrete Institute.      ACI 349, Chairman of Subcommittee  on Design American Institute of Steel Constructions PUBLICATIONS AND REPORTS Numerous  publications  on  structural and seismic  analysis of nuclear power  plants.
GAH-4
 
99901A PRW12.93 Disk4 PAUL R. WILSON EDUCATION:
B.S. - Civil Engineering - Bradley University, 1980 REGISTRATION:
State of Ohio PROFESSIONAL HISTORY:
Stevenson 8 Associates, Cleveland, Ohio, Project Engineer:      1981 - present Fabco Metals, East Peoria, Illinois, Detailer: 1978-1980 EXPERIENCE:
Since April 1981 Mr. Wilson has served as a Staff, Senior and Project Engineer for Stevenson 8 Associates.      He has over fourteen years experience as a structural-mechanical engineer.
Mr. Wilson has been involved with fragility analyses of structures and components for seismic and other accident loads. For those project involving seismic fragilities, he was involved in the development of seismic floor response spectra including soil-structure interaction effects. Additionally, he has developed seismic floor response spectra for use in the USI-A46 program and seismic IPEEE program.              He co-developed a computer program to evaluate the seismic margin capacity of vertical cylindrical liquid storage tanks.
Mr. Wilson has been responsible for a design audit of the analysis of a reactor containment building internal structural steel and seismic capabilities of a variety of mechanical and electrical equipment and distribution systems.        He has performed analysis for the seismic qualification of structural steel supports of more than 100 electrical components and piping systems. Mr. Wilson served as project engineer for the reevaluation of the seismic capabilities of some 69 electrical and mechanical components of an operating nuclear power plant for Northeast Utilities Company. He has also performed in-depth comparisons between the structural steel design requirements of the AISC specification and the ASME Codes.
While serving as a consultant for the Midland Nuclear Power Project to Bechtel Power Corporation, Ann Arbor Office, Mr. Wilson helped prepare and review seismic qualification documentation for a large number of components in preparation for an
 
au i o              e  i an      ucear ower ro~ec.
Mr. Wilson has been involved in in-situ modal testing and analysis of structures, including structural steel truss type electrical transmission towers and nuclear plant electrical cabinets and racks, and in the recording of ground motion characteristics due to underground blast.
In addition, Mr. Wilson has performed numerous linear and nonlinear computer analyses of components structures, and structural systems. He has also developed computer software to automate analysis of mechanical components for limiting nozzle loads.
Mr. Wilson has provided technical litigation support with respect to structural analysis and design, which included document reviews, and deposition preparation and support.
PROFESSIONAL GROUPS'ember, American Society of Civil Engineers Member, American Concrete Institute Member, National Society of Professional Engineers PUBLICATIONS'kreiner, K.M., Stevenson, J.D., Wilson, P.R., "Relay Behavior at the Perry Nuclear Power Plant During the 1986 Earthquake in Leroy, Ohio," EPRI NP-6472, Project 2849-2, September 1989.
Stevenson, J.D., Wilson, P.R., "The 1986 Leroy Ohio Earthquake:      Performance  of Power and Industrial Facilities," EPRI NP-6558, Project 2849-3, November 1989.
Stevenson and Aesodatee
 
'J 1
 
SATYAN-SHARMA, TIRUMANI 352 CORNHILL COURT WESTERVILLEg OHIO~ 43081 Phone:  614-895-2278 Citizenship:    United States Citizen EDUCATION:    New  York University, New York  M.S. (Struc. Mech)  1973 University of Mysore, India  B.E. (Struc. Mech)  1967 Completed Westinghouse Reactor Simulator Training (1 week)
REGISTRATION:      Professional Engineer,    New  York State, EXPERIENCE
 
==SUMMARY==
:      September  1978  Present:
AMERICAN ELECTRIC POWER SERVICE CORPORATION 1  Riverside Plaza, Columbus, Ohio 43215 Principal Engineer  Project Manager Nuclear Engineering Department (1994  Present)
Project Manager responsible for all issues related to the reactor vessels of Cook Nuclear Plant Units 1 6 2.
Project Manager for      NRC GL  87-02, Seismic  Verification of Electrical and Mechanical Equipment      in Nuclear Plants,  SQUG Project.
Principal Engineer, (Nuclear Safety a Licensing)
Nuclear Operations Division (1978  1993)
Responsible    for the licensing efforts and providing safety analyses support to operating power plants (Cook Nuclear Plant, Units 1 & 2) in the areas of engineering mechanics, structural mechanics and mechanical engineering. Responsible for responding to the NRC on I.E. Bulletins related to the above fields, preparation of Technical Specification amendments,    coordination for licensing interface for the Inservice Inspection Program, responding to the NRC Inspection Reports and participation in the meetings with the NRC to resolve items related to the above fields.
Lead Engineer/Group Supervisor responsible for safety reviews performed in accordance with 10 CFR 50.59 for all design changes and plant modifications; design criteria and specification changes; evaluation of problem reports for reportability evaluation.              Cognizant Seismic Engineer  for  equipment seismic    qualification.
Representative for the AEPSC in: Westinghouse Utility Owners Group Material Subcommittee;          Corporate    Representative    for Seismic Qualification Utility Group (SQUG) on USIA-46; Attending Member for Material Property Council (MPC), review technical papers for MPC for publication, Member of EPRI-Post Earthquake Investigation; AEP representative in the W utility group that developed the Leak-Before-Break criterion; Member ASCE/ASME Committee on Nuclear Standards.
 
.0 AEPSC    representative to the Westinghouse Utility Group that developed the leak-before-break criterion. Lead engineer for the pressurizer surge line monitoring instrumentation and evaluation project. Performed safety evaluation for steam generator replacement.
Performed plant decommissioning studies.      Act as AEPSC cognizant engineer on seismic qualification of electrical    and mechanical components. I am also responsible for contract administration and technical coordination with consulting companies. AEPSC representative to the WOG-Material Subcommittee.
1978 to 1979: Responsible for safety and licensing activities of proposed changes to the plant as per 10CFR50.59, preparing licensing amendments, and coordinating efforts on responses to NRC Bulletins, Generic Letters, etc.
1975 to 1978: Stone  &  Webster Engineering Corporation,  1  Penn Plaza, New  York,  New  York. Staff Engineer  - Engineering Mechanics.
My  responsibilities, associated with the Green County Nuclear Power Plant, included: Engineering and specification of an ASME Class 1 (plate and shell type) structural support for the reactor vessel, which included preliminary and final designs; finite element stress analysis and stress reports as per ASME Section III  - NR; and supervision of Engineering and Design.      I also designed the housing for excore nuclear instrumentation.
Coordinated with the NSSS vendor (Babcock & Wilcox) in performing the NSSS primary loop analysis for pipe rupture/break forces, determining the effect of rupture loads on the reactor vessel, and developing preliminary designs for guard pipes for coolant loop elbows. Also coordinated with the NSSS vendor concerning the installation of major nuclear components with respect to refueling procedures.
Responsible    for Class I equipment seismic qualifications conducted in accordance with      IEEE-344.
This  means  that I provided seismic/ASME stress criteria input for all of the Stone & Webster specifications, aided in the bid evaluation and contract award and was involved in final vendor document review in the areas of stress reports and seismic qualifications. The Class I equipment involved included major equipment such as the diesel generator, polar crane and main steam  safety valves, etc. I was also involved in writing the    PSAR and other licensing activities.
I had concurrent similar responsibilities on two other nuclear projects, the Surry Nuclear Station for the Virginia Power and Light Co., and Santillan Nuclear Station for Electra-De-Viesgo (Spain).
 
12/73 to 1/75: Bechtel Power Corporation, Ann Arbor, Michigan.
Structural Mechanics Engineer.
Responsible for engineering, finite element analysis and design of the pre-stressed concrete containment building for a 1380 MWe PWR nuclear station for the Consumer Power Co.      Responsibilities included coordination with the Construction Department and pre-stress vendors. I was also responsible for preliminary studies/criteria and final design for a coal power plant for the Texas Light and Power Company.
2/72 to 12/73: Burns & Roe,    Inc., Oradell,  New Jersey. Structural Engineer.
Responsible  for engineering and design of the diesel generator building, containment mat and biological shield analysis by using the finite element program for a BWR nuclear plant for WPPSS.      Responsible for engineering and design of all the NSSS component supports and pipe restraints and engineering analysis coordination with the NSSS vendor and related interface on a PWR plant for the Jersey Central Power and Light Company. This involved extensive finite element analysis of the heavy section steel components.
6/69 to 2/72:  E. Lionel Pavlo Engineering Company, New York, New York. Structural Engineer (Long Span Bridge Division).
Engineering, design and supervisory responsibilities associated with drafting plans for the 1688-foot span cantilever truss bridge (longest in USA) (Chester Bridgeport Bridge across Delaware River). Extensive finite element stress analysis, and designs for pile foundations, piers and cofferdams in conformance to AISC and AASHO codes,    Coordinated efforts in fabricating the main truss with Bethlehem Steel Company and the construction groups.
9/67 to 9/68:  Government  of  Mysore, India. Junior Engineer.
Designed a  multi-story reinforced concrete building and several bridges for    a national highway project. In addition, designed and supervised construction of an elevated reinforced concrete water tank and an industrial building.
~Lan ea e English Kannada,  Hindi (Indian languages)
 
Systems one ~23elng- ~Zumlonfion    Srnioing Sourse St~is is ta Serlifg  flint                  T. R. Satyan-sharma II nSS Atfrnhrh ll~r $ II%    Sgsft'nls nnh 43riag Kunlnntian
$ ninlng $ 01118P ltrlh 1                        on    November 14-16, 1989        . Kills lnclnhrs AHtnhnnrr in ter              systems and Relay          IigrttSS Itg p(SS )
Systems dna/ar Kytmg Richard  G. Sfarck, II, MPR Associates Systems Instructor Jess Betlack, MPR Associates Relay Instructor
 
Y i >) t".('~I (i I
~
I',.((i,.
I/..
;    !Iltl.
~
t<(                                    51~is is la          Sevlifg 11~<<I Ill'j((                  K. B. 5 mtg Hn Sl~<<rm<<
          't((
1(ns  Sunsplelrh Illr 5(~)V~I(!3 Sl<(ll((<a<un 5rrrrn<nq f'inc(                nnh Seismic tu((lnnlian G~rnining G~onrsr
                                  <a)rile    J"  nnr 2<: 2k'                  <3~J2 i
I((((
Sp(I
((I((
Neil I'. Hi>>i(I<. Co>>)i>>o>>wcnl(I< F.<lisn>>
S()U(f (.I) Olr>>ln>>
(((!I(
: l.                          l)ovid h. Freed. hIPIL hssocinles            llnlfea L I'ns~n worn              FI'III
<!. (<I! I<.                HQUG  Trni>>I>>g (:nordi>>nlor                  H()U(f''rop< n>>< bin>>nl!< r      ~
I,.-
((((l(<                    b
 
Bertil A. Svensson EXPERIENCE I  have been continuously employed by an American Electric Power Company subsidiary company since September 15, 1955 in various positions as follows:
July, 1986 to December 31, 1993 Executive Staff Assistant Indiana Michigan Power Company Donald C. Cook Nuclear Plant One Cook Place, Bridgman, Michigan 49106 Responsible to the Plant Manager for organizing and coordinating licensing activities at the plant level and for assuring earliest and continuous plant involvement in licensing and other regulatory processes.
Representing the Plant on the 'Seismic Qualification Utility Group'nd the Company Task Force formed to implement the NRC Generic Letter 87-02, "Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue, USI A-46".
Representing the Plant Donald C. Cook          Nuclear  Plant  Design  Basis Documentation Reconstitution Project.
Serving as the alternate primary representative to the Westinghouse Owners Group and as the Company/Plant representative to the WOG Operations Subcommittee.
July, 1977 to July, 1986 Assistant Plant Manager - Operations Cook Nuclear Plant Responsible to the Plant Manager for the direction of the Operations Department activities to assure safe, efficient and reliable operation of the Plant. Coordinating operations and maintenance activities with the plant departments.
Performed the duties of the Plant Manager in his absence.
Served as a member and the Secretary of the Plant Nuclear Safety Review Committee and the Chairman of the PNSRC Subcommittee on Operations.
 
Bertil A. Svensson Page 2 September, 1969 to July, 1977 Operations Supervisor Cook Nuclear Plant Planning and Staffing the Cook Nuclear Plant Operations department.
Cold-License reactor operator training conducted by Westinghouse during the year 1970, which included obtaining a Reactor Operator Certificate on the Saxton Nuclear Reactor Plant.
Participated in the planning and execution of the pre-operational and start-up testing programs.
Responsible for all operations department pre-operation and startup test procedures and as a PNSRC member for reviewing all pre-operational and startup test procedures for the plant.
Responsible for the development of all operations department normal, abnormal, emergency, surveillance testing and annunciator response procedures.
Responsible to the Plant Manager for the safe and efficient execution of all Operations department activities associated with the operation of the two 1100 MW Cook Nuclear Plant units.
Responsible for compliance with the plants's technical specifications governing the operation of the nuclear plant.
Obtained a Cold Senior Reactor Operators License in 1974 and maintained the license until August, 1987.
July, 1968 to September, 1969 Engineer American Electric Power Service Corporation New York, NY Transferred to AEP Service Corporation, New York offices to (1) complete the Muskingum River Plant, Unit 5 startup report and operating procedures and (2) to work with the Cook Nuclear Plant, Plant Manager on system design reviews and to assist in the planning of the Cook Nuclear Plant organization including visits to other nuclear plants.
 
Bertil A. Svensson Page 3 July, 1965 to July, 1968 Startup Engineer American Electric Power Service Corporation Canton, OH I was officially transferred from the Kammer Plant to AEP Service Corporation, Mechanical Engineering Division, in Canton, OH as a startup engineer, July, 1965. I was working in this capacity on loan from the Kammer Plant since January, 1965. My duties in this position over the three year period involved the following:
January, 1965 to July, 1965 - worked as one of four on-shift startup engineers on the Tanners Creek Plant, Unit 4. A 500 MW unit with a coal fired supercritical boiler. My duties involved systems checkout, coordinating resolutions of checklist items, pre-operational and startup testing, planning and coordinating startup activities and the preparation of startup reports and operating procedures.
July, 1965 to December, 1967 - Cardinal Plant Simulator commissioning and startup of Units 1 and 2. My responsibilities involved the following activities:
Final checkout and testing of the Cardinal Plant Control Room Simulator.
(This was the first complete control room simulator in the country).
Lead instructor on the simulator for the operating crews for the two Cardinal Units and the Muskingum River Plant, Unit 5 operators.
Lead Startup Engineer for Cardinal Plant Unit 2. The Cardinal Plant units are both 600 MW units with coal fired supercritical boilers.
        ~      December, 1967 to July, 1968 - Lead Startup Engineer for the Muskingum River Plant, Unit 5 a 600 MW coal fired supercritical boiler.
June, 1958 to July, 1965 Engineer Ohio Power Company, Kammer Plant Moundsville, WV Transferred to the Kammer Plant. During my seven years at the Kammer Plant I held the following positions:
 
(,l ',
1
~Vr pl
      't
 
Bertil A. Svensson Page  4 June, 1958 to September, 1959 - Test Engineer. My responsibilities as a test engineer involved performance testing and monitoring of the boilers, turbines and auxiliary systems for the three 225 MW conventional boiler units.
September,    1959 to December, 1960 - Assistant Results Engineer.
Responsible for the maintenance, calibration and tuning of the instrumentation and control systems for the three Kammer units.
December, 1960 to July, 1965 - Results Engineer.            Responsible to the Operations Supervisor for supervising and directing the Instrument and Controls Section and the Plant Performance Section for the three Kammer Plant units.
September, 1955 to June, 1958 Engineer, Piping Section American Electric Power Service Corporation New York, NY My responsibilities as an engineer in the Piping Section involved flow diagram reviews, piping system designs, piping sizing and pressure drop calculations and working with piping and hanger manufacturers including field trips to manufacturers and our plants under construction to check on piping fabrication and installation.
November, 1953 to September, 1955 Exchange Student - Engineer Knutsen's Shipbuilding Corporation Halsite, NY My employment with Knutsen's Shipbuilding Corporation was as an exchange student - engineer. I was sponsored by the American Scandinavian Foundation for the purpose of gaining practical experience in American industry. My primary duties involved working with mechanical and fluid systems design and installation on small navy landing crafts and rescue boats.
EDUCATION Graduated with a degree in Mechanical Engineering (3 year program) in 1952 from "Norrkopings Tekniska Gymnasium" (Norrkoping's Technical College), Norrkoping, Sweden
 
Systems ntth <Relng <Zunluntiart mrniniug Saurse Kilts is ta Srrttfg tgaf          Bert svensson                                      llas Atfrnhrh ter SQQIS Sgsfrms anh <Crlag Kvalnatian IBrainlng <<Ilanrsr II<<lb an                      ~~. IEIIIs inrtnbrs Mfrnhanrr in ter            a. -. -s Ra;                  I<<<<arts<<lap(s).
SgStemS  blnh/ar <<Rely Richard  G. Starck, II, MPR Associates Systems Instructor Jess Bettack, MPR Associates Retay Instructor
 
GORDON P, ARENT 2588 RACHER DRIVE POWELL, OHIO 43065 (614)7984430 (614)223-2048 WORK EXPERIENCE January 1993 to Present Project Coordinator, NSL&F (Licensing) previously NSL&A (Assessmcnt):                    Duties include:    an indepcndcnt asscssmcnt of shutdown risk issues and schedules related to plant outagcs, licensing related issues, ownership of environmental issues and Tcchnical Specifications.          Additional duties include the performance of self-assessments of all facets of D. C. Cook Nuclear Plant Operation including outagcs.
The assessments provided a critical review of the Plant in comparison to NRC and INPO standards and expectations.
July 1992 to January 1993 Licensing Coordinator, Safety and Assessment Department, D. C. Cook Nuclear Plant. Responsibilities included: dctcrmination of prompt rcportability for operational events, review and dctcrmination of issues related to licensing in support of plant operations and coordination of the Licensee Event Rcport System.
Other duties included: alternate PNSRC Secretary, NRC liaison (with resident inspectors) and special projects (including tbe Design Basis Reconstitution Project and SQUG).
September      1991 to July 1992 Operations Department Procedure Supervisor. Formally established the Operations Department Procedure Section, including development of position descriptions, writers guides, administrative guidelines for the section and a strategic plan for procedure upgrade.            Responsibilities included:    management and administrative duties associated with the section, formal development of the section including tbe Five Year Strategic Plan and implementation of tbe Operations Department Modification Analysis Program.
Collateral duties included: Acting Operations Training Specialist, department interviewer for prospective operators and special project assignments (e.g., WOG, SQUG, IPE/PRA, and Reduced Inventory Programs).
Deceniber 1986 to September      1991 Operations Department Training Specialist. Responsible for thc development and implementation of on-the-job training for all Operations Department on-shift personnel.        Additional responsibilities included:
the review of all training materials presented to the operators for both the classroom and simulator settings, evaluation of simulator performance and training and acting as thc liaison between the Operations Superintendent and tbe Operations Training Supervisor on issues pertaining to operator training. Collateral duties included: Acting Procedure Supervisor (beginning January 1990) and special projects (e.g. simulator task force, site liaison-Appendix R).
August 1985 to December 1986 Operations Department Administrative Compliance Coordinator.                Duties included investigation and reporting of operational events related to the Operations Department, development of administrative procedure and policics and responding to issues identified by internal and external regulatory groups (e.g.,
INPO, NRC, ANI and Quality Assurance).
 
WVORK    EXPERIENCE cont Septcmbcr 1979 to August 1985 Plant Operator. Started at thc plant as a utility operator and held on-shift positions up to and including reactor operator. Performed activities which included: plant tours, surveillance, system tagouts and alignments. Once licensed, performed all licensed operator activities including duties as a Unit Supervisor (stepped up follownig achievement of senior operators license). Additionally, acted as Field Coordinator for the Unit One 10 year ISI Hydrostatic Testing Program in 1985.
SPECIAI. ACTIVITIES/TRAINING Organizational Development Activities:
Developed Control Room Rcsponsc Organization in support of the Emcrgcncy Plan Developed and Implemented Operations Department Procedure Organization Initiated and Sponsored thc development of thc five (5) year strategic plan for procedures Initiated and Sponsored thc development of the Modification Analysis Program (MAP)
Special Activities:    Westinghouse Owners Group Operations Subcommittee Priniary Representative IPE/PRA Independent Review Team - Plant Rcprcsentative DBD Reconstitution Project - Project Engineer - Action Items SQUG Task Force Member Simulator Task Force Member Plant Liaison for Appendix R Audit INPO Peer Evaluator4cqouyah Station 1987 RHR/Reduced Inventory Task Force (GL 87-12, 88-17)
Chairman, Operations Department "Code of Excellence" Committee Secretary, EOP Engineering Support Group (EOPCOPS)
Traiiililg:            Licensed Reactor Operator and Senior Reactor Operator at D. C. Cook Nuclear Plant Seismic Qualification Utility Group(SQUG):      Determination of Safe Shutdown Equipment and Relays General Physics&cneral Motors Project Management Training Root Cause Analysis Training Basics of Supervision Supervisory Job Interview Training Supervisory Employee Assistance Program Training Supervisory Fitncss for Duty Training Equal Employment Opportunity/Affirmative Action Training INPO Sponsored Team Building Training EDUCATION Bachelors of Arts, Business Administration and Bachelors of Applied Science (Nuclear TeclinOIOgy, Sicna Heights College, April 1995 Senior Reactor Operators License, 1986 Associate Degree Applied Science, Lake Michigan College, May 1987 Diploma, St. Joseph High School, St Joseph, Michigan, Junc 1975
                                      ~
 
~ (
(((I(i I(II!~
Ii(iii(
uU V,
~(.,:iI(~
Sgis is ia Seriifg igni Sarhan Areni
((i((                                          P HS      Sam Plated f Pe
                              $ $ 8f($ <kquiPmeOi SLleLtiaO                                HOB i(I Il LCP1HQ            KUHIOHilQO                Kl HIOIOg $ 601-SP
                                        <9elh    Slang            18 20,      1991
          '.I(
Paul W. Hayes. btPR A ociates                                Richard G. Starck II. b)PR Associates J  Betlack. MPR Associates
 
                                                                ~
                                                                  ))Iij R Cl U Gs                                <!IIj!!j jI)jlfj 4
                                                              '!Ij>II 5((is rs ja Strtrfg tPaf                      '<>i  ~ i (Sorhon Aren1 gas Kompleieh 1ge SQQf($ Bt'lag <Evaluation          Kraining Sour-se          'i    ~lj Pelh 8larcP      18,    1991                      'ij>!Ijj
                                                              'jij(lj
                                                              'jjIjIlI Betlack, MPR Associates
                                                              'iljl~jj
 
HAROLD W. YOUNG,    III Senior Mechanical Engineer Personal:
6988 Ernest Way,      Dublin,  OH  43017.  (615) 761-8144.
Born January 15, 1952.        Married, two children.      Height:    5'-ll",
Weight:    175  lbs.
Education:
Stevens    Institute of  Technology, Hoboken, NJ.      BSME,  1974.
Professional Licenses:
Professional Engineer;      New  Jersey  GE27280; Ohio  E-050097.
Professional Societies:
Member ASME, ASHRAE.
Ex  erience:
American Electric Power Service Corporation,          1  Riverside Plaza, Columbus, OH 43215.    (614) 223-2000. 1984  Present.
Currently Cognizant HVAC Engineer for the Cook Nuclear Plant. Responsible for HVAC engineering of this 2,200 megawatt facility. Prior to holding this position, served as a Senior Engineer in the Mechanical Engineering Division.
Responsibilities include design, specification writing, construction support and oPerations support.      Total design responsibility for HVAC systems, dust collection systems, chilled water systems, steam piping systems, lab vent systems and HEPA filtration systems.          Major projects for which I was lead HVAC engineer include:
o  Cook  Training/Simulator Facility  A 100,000 sq. ft. facility including office space, classrooms, labs, a video studio, welding and machine shop areas and a $ 40,000,000 simulator facility with associated computer room.
o    A 28,000 sq. ft. office  building with  an  instrument calibration lab.
o    A  12,000 sq. ft. office  building  and locker    room  facility.
o    Service buildings for the Cook steam generator replacement project.
o    Tidd  PFBC Demonstration Plant  All HVAC design and procurement for a        DOE funded experimental coal fired power plant, including five large dust collection systems, miscellaneous HVAC and ventilation systems. Work includes innovative adaption of forty year old existing ventilation systems.
 
o  Zimmer Conversion  Project    Developed all HVAC design changes for converting existing  HVAC  systems from nuclear plant requirements to coal plant requirements.
Burns 6 Roe,  Inc.,  550 Kinderkamack Road,    Oradell,  NJ 07646.  (201) 265-2000.
1974-1984.
Worked as a Senior    Building Services Engineer, providing power plant HVAC design,  utility retrofit  services and designing auxiliary facilities.
Designed HVAC systems, ventilation systems, piping systems, fire protection systems and HEPA filtration systems.      Was involved with writing technical proposals, developing budgets and schedules, developing specifications, documents and drawings, overall project coordination and field support.          Had two years of field construction experience.        Major projects included:
o  General Public Utilities, Oyster Creek and Three Mile Island, 1980-1984.
Responsible for new, retrofit and replacement HVAC and fire protection systems.
o  TVA  Sequoyah  Radwaste  Facility,  1982-1984. Responsible  for design of all  HVAC and  fire protection.
o  Nebraska Public Power    District  Cooper  Station, 1981-1982. Responsible for design of fire protection supply      system including pump house, yard piping,  fire  pumps and storage tanks. Served as project coordinator.
o  Three Mile Island Recovery    Effort,  1979.
o  Forked River Station, 1978.      Developed  HVAC  and piping systems.
o  Three Mile Island, 1974-1977. Was Field Engineer for HVAC and        fire protection for two years. Worked in home office prior to that assignment.
Additional Courses:
Management  of Human Resources (Fairleigh Dickinson University)  1978.
Practical Fossil Power Plant Technology (Burns and Roe)  1979.
CADD Terminal Training (Intergraph)  1982.
Principles of Supervision (AEPSC)  1988.
Computer Courses:
DOS,  Enable Spreadsheet,  Enable Database  1989.
OS2,  Office Vision, Intermediate Lotus    123  1990.
 
(JP'UI      PEG PO Sl~rs ts ko Stratify kl~ak llas Somplefeh tile SQ~QIS 9lalkhotun Screening anh Seismic <Evaluation Sraining Saurse Sell August 2 6, 1993 Neil P. Smith. Commonwealth Edison SHRUG  Chairman David A. Freed, MPR Associates g    (l  l Robert P. Kassawara. EPRI SHRUG Training Coordinator          SHRUG Program Manager
 
PERSONAL PARTICULARS NAME:              whiten V. Ruparel ADDRESS:            4433 Castleton Road West, Columbus, Ohio,43220 PHONE:              Home:        614-457-7710 Ofhce:      614-223-2544 FAX:                Home:      614-459-4321 DUAL CITIZENSHIP:    united States and Canada MARITALSTATUS:      Married, two daughters 23 and 19 SOCAL SECUtuTY k    282-78-9291 EDUCATION:          1962:  BASc.: Electrical Engineering, London,U.K.
1977:    MASc.: Management Science, Waterloo, Canada LANGUAGES:          English, Hindi, some French, some German.
TEACHING:          Mathematics: Sheridan College, Ontario, Canada: 1977,78 Electrical Engineering, Franklin University, Columbus, Ohio,1991,92 AFFILIATIONS:      Professional Engineer, Ontario, Canada President, Columbus Section,ISA,1995-96 Uice-President, Socity of Professional Engineers of Atomic Energy of Canada,1977 President, Knolls Arlington Community Association,1990 Graduate, upper Arlington Leadership Program,1991
 
Work Experience American  Electric Power  Service Cor oration Present              Project Manager, Design Basis, Nuclear Engineering. Collateral duties: Member: Life Cycle Assurance Task Force. Member: Nuclear Design Oversight Commitee: 10CFR50.59 Reviews of all design changes and procedures.
1988-1991            Group Leader, Design Changes- Supervision of IEC Design Changes for the Cook Nuclear Plant. Collateral duties: Representative for Nuclear Engineering on the Design Change Co- ordination Group, Member: SQUG Task Force, Member: EDSFI Response  Team.
1983-1987            Lead  Electrical Engineer: Responsibility for engineering of design changes for the two unit, 1100MWe Westinghouse PWR Cook Nuclear Plant. Collateral duty: Member:
Assessment  Team, INPO and  industry Operating Experience implementation.
Ohio State Universit 1982                Associate Director: Nuclear Services and Training Laborotary. Co-taught Nuclear Safety at the graduate level, developed training material for Shift, Technical Advisors and Senior Reactor Operators for the Perry, Davis-Besse and the late Zimmer nuclear power plants.
 
1968-1971            Engineer, Fuel Handling Controls Worked on the design    of the controls and instrumentation of the CANDU on-power fuelling machine:  logic circuits, electro-hydraulic servo- controls and on-line direct digital control using a blue collar IBM 1800 computer.
The En  lish Electric  Co. Limited 1964-1967            Technical Representative: Responsibility for company's business in Nepal. Working through a local agent, handled the sales, contracts, technical liaison of turnkey diesel stations, 11 kV circuit breakers, transformers, small motors etc.
1962-1964            Graduate Engineering Training Program The  first year was spent in following a control rod system through design, drafting, production, test, site installation and checkout. The second year was spent as an assistant startup engineer at Hinkley Point  A  nuclear generating station.
 
Sgsbms noh <Relay <Zunluntrorr      Sraining .Sourse tttgiS iS ta Srrtifg tPat          >><<>>- Rasa<<l                                      gas Attrnhrb tPr $ ftlS Sgstrms anb <Rrlag Evaluation lltraining Sanrsr prlh an s t,b ps 99,999 . Kttis inrlnhts Mtrnbanrr in ter            systems and Relay            Nial ttsllap(s).
Systems    mnh/sar KelmsJ Richard G. Starck, II, MPR Associates Systems Instructor Jess Betlack, MPR Associates Relay Instructor
 
JUAN M. NIETO 1056 Autumn Woods    Drive Westerville,  OH  43081 (614) 891-5978  (Home)
(614) 223-2053  (Work)
EDUCATION University  of Michigan, Ph.D. Nuclear Engineering, 1969 University  of Michigan, M.S. Nuclear Engineering, 1963 University  of Madrid, M.S. Mining Engineering, 1961 University  of Madrid, B.S. Mining Engineering, 1960 WORK  EXPERIENCE 1986  to Present Senior Engineer/Engineer, Nuclear Operations, American Electric Power    Service Corporation.        Duties: Training Coordinator responsible for the implementation of training requirements in NS&L AP-10, and NSL&A AP-10.      Trained NS&L/NSL&A staff on Emergency Operating Procedures, UFSAR Chapter 14.0 Safety Analysis, and various Technical Specifications and Systems Descriptions. Assist the manager of the Nuclear Safety Section with the annual training and testing of the NSL&A technical staff on NOD QP-7, Safety Reviews, and 10 CFR 50.59, Changes,          Tests and Experiments.
Generated and updated a pool of near one hundred questions on NOD QP-7 and 10 CFR 50.59 for the annual test. Serves as Training Coordinator for the NSDRC Subcommittee on Emergency and Security Plans, and have trained that Subcommittee on Emergency Operations Procedures (EOPs), and interface between the EOPs, and the UFSAR Chapter 14.0, the Technical Specifications, and the Emergency Plan.
Assist the AEPSC Training Coordinator in his efforts to establish a training program for the Corporation.      Have been trained on Root Cause Analysis, PRONET (program to search the UFSAR, the Technical Specifications, and other documents), core design, basis for D. C.
Cook Emergency Operating Procedures, and other subjects.
Serve in the NSDRC Subcommittee on Corporate and Plant Occurrences conducting reviews of assigned documents.          Serve in the NSDRC subcommittee on Emergency and Security Plans, conducting reviews of assigned documents, and acting as Training Coordinator for the Subcommittee.
 
+'l' Serve    as  leader  of  the    Emergency    Operating    Procedures Multidisciplinary Task Force,  and as interface between Cook Nuclear Plant and AEPSC on EOP related issues. Was the lead engineer on the update of the EOPs as a result of reducing the boron concentration in the Boron Injection Tanks to 0 PPM.
Served as Independent  Safety Reviewer for the Nuclear Safety and Licensing Section (NSL&A). Serve as alternate Independent Safety Reviewer for NSL&A. Qualified Safety Reviewer in NSL&A. Have performed safety reviews of numerous            RFC's,  MM's, PM's, Specifications, Generic Procedures, and other    miscellaneous  items, under 10 CFR 50.59.      Have performed Reportability Reviews of numerous Problem Reports/Condition Reports under 10 CFR 21, 10 CFR 50.72 and 10 CFR 50.73. Have provided input for the preparation of several Licensee Event Reports.
Serve as a member of the AEPSC SQUG Task Force since its inception.
Main author of the SQUG Report to be submitted to the NRC as part of our response to Generic Letter 87-02. Have trained the members of the SQUG Task Force on Safe Shutdown paths and other aspects of the Generic Implementation Procedure (GIP).      Recording Secretary of the AEPSC SQUG Task Force. Have participated in the initial seismic walkdown of Cook Nuclear Plant (Units 1 and 2). Have been trained by SQUG on the determination of the Safe Shutdown Paths for each Safe Shutdown Function as defined in the GIP.
Have coordinated numerous responses      (non-submittals), to NRC's information notices. Was the lead engineer for the submittal on Cook Nuclear Plant Unit 2, Cycles 8 and 9.          Made a successful presentation to the NRC to request changes in Chapter 14.0 of the UFSAR to reflect the safety analysis        in Chapter 14.0 of the original FSAR. Was the lead engineer for the submittal in response to GL 90-06. Was the lead engineer for the submittal on proposed changes to the Technical Specifications as a result of the new spent fuel criticality analysis for Unit 2, Cycle 9.            Was the author of the Restart Report for Unit 2, Cycle 8. Prepared a submittal to the NRC on status of our commitments regarding increased pressurizer PORV reliability in response to GL 90-06.
Has provided technical assistance on a variety of subjects, such as: a) Impact of potentially deficient card in AMSAC; b) Potential problems in the OT dT and OP bT instrumentation; c) RVLIS not environmentally qualified; d) Inadequate emergency lightingg e)
Separation between safety related and non-safety related portions of the Reactor Protection System; f) Potential for inadequate core cooling during transfer to hot-leg recirculation during a LOCA, and others.
 
1973-1986 Nuclear Consultant, NUS Corporation. Duties: Performed activities associated with accident analysis, licensing and safety, high level waste disposal, and liquid metal fast breeder reactors.
1969-1973 Nuclear Engineer, NUCLENOR (Spain), Involved in pre-operational and start-up testing; prepared final safety analysis report; worked in fuel management.
 
gas Sompleteh. Ige            8/55        Salhhoun Screening anh Setsmtr <kualnaiion Kraining Sourse
:,.Sell Slag 3 7, Ic363 SgV~
                                ~ ~
Neil P. Smith, Commonwealth Edison SQUG Chairman David A. Freed, MPR Associates      Robert P. Kassawara, EPRI SQUG  Training Coordinator          SQUG Program Manager
 
Randall C. Steele Professional Ex erience 6/87 to Present          American Electric Power Columbus, Ohio 3/94 to Present    USI    A-46    Lead      Relay      Reviewer, Instrumentation      and  Controls Design Section, Nuclear Engineering Department.
Responsible for USI A-46 Relay Evaluation for Donald C. Cook Nuclear Plant.
5/91 to 3/94        Low    Voltage A.C. Distribution System Engineer, Nuclear Engineering Department.
Responsible for 120 Volt A.C. Vital Bus System. Prepared for and participated in the Nuclear Regulatory Commission's Electrical Distribution    System  Functional Inspection at the Donald      C. Cook  Nuclear Plant.
6/90 to 5/91        Electrical Verification Engineer, Wm. H.
Zimmer Generating Station, Moscow, Ohio.
Responsible for onsite electrical control circuit    design    review,    field  design modifications, and equipment check-out and start-up during the construction of the plant.
ll/89 to 6/90      Electrical Engineer,            Fossil    Plant Engineering Department. Responsible for various design modifications on fossil plant auxiliary power and control systems throughout the    AEP  system.
6/87 to 11/89        Electrical Engineer, Nuclear Engineering Department. Responsible for Environmental Qualification of Electrical Equipment and various design modifications involving the auxiliary power and control systems at Cook Nuclear Plant.
Education B.S.E.E., University of  Illinois at  Urbana/Champaign,    May 1987.
E.I.T. Engineer in Training, State of Illinois.
lt
* SQUG Equipment Selection Training Course, November 17-19, 1992 SQUG Relay Evaluation Training Course, November 17-19, 1992 SQUG Walkdown Screening and Seismic Evaluation Training Course, February 1-5, 1993
 
s 0. Dctlack, h(PR Associates Gll~iS iS )O Serfifg Il~al P.Hn6g O'IIeeI.e gas Somplt irk tl~t
$ $ 8fS KquipmLni &@let-tton Krmining Kovember 17 19, 1992 Soot-sL'rfh I
I'nul W. llayes. hll'R Associates                          Richard G. Starck II, hlPR Associates
 
Ull~iS iS          Io SerIifg il~nl
              <Saran)III                      K. Sil.l.le l)ns San(pleio(h      il)r 5$ Q~I5 9lnlitltotBB Srrrrninq BB6 Sf'tsnltr L~o 'Hl Bttit OB o'rHtntnff $ 00rs.l" 5rltt 3<'rbrunrq l 5 l 993
    ~GRIG Neil P. Smith. Coin>nonwea lth t,"dison SQUG  Chairman de'avid A. Freed. hIPR      Associates        Robert P. Kassawara, k:VRl SQUG Training Coordinator                  SQUG  Program Manager
 
RICHARD P. LEONARD) P.E.
9296 Gast Road Bridgman, Mi 49106 (616) 465-5329 Engineer with more than 20 years of experience in various facets of nuclear power plant operation.
Areas of strength include Instrumentation & Control, general power plant operation, ability to integrate and benefit from a broad experience base to resolve problems and accomplish goals, and a willingness to pursue new opportunities and challenges. Able to work well with diverse groups and individuals.
SIGNIFICANT EXPERIENCE 7 90 to Present:            Senior System Engineer at Donald C. Cook Nuclear Plant responsible for the Chemical and Volume Control System (CVCS). Duties include coordination of large or complicated maintenance activities, tracking and trending of system operation, review and initiate design changes, recommend maintenance priorities, provide information and assistance to other departments, and provide a monthly report to plant and corporate management. A recent significant accomplishment was the direction and management of a major effort to clean and refurbish the Boric Acid Storage Tank room. This project included several design changes, the coordination of work by different departments, and development of innovative approaches to minimize future contamination.
7 85 to 7 90:                Associate Engineer in the Nuclear Fuel and Analysis section of American Electric Power Service Corporation. Primary duties consisted of assessing safety analyses and
                                      ~
        ~              ~
operational problems in consideration of instruments and instrument uncertainties. Involved in providing
  >puts to and reviewing safety analyses provided by fuel vendor. Responsible for developing the RTD
                    ~
                                                                    ~
Cross-Calibration procedure in coordination with Westinghouse and the Cook Nuclear Plant l&C section. Assisted in developing and implementing the Reduced Temperature and Pressure program to minimize steam generator tube degradation in Unit 1 Dealt directly with fuel vendors and NRC
                                                              ~
personnel.
1975 to 1983:                Salem and Hope Creek Nuclear Power Plants-l8C Technician and Training Instructor. As l8 C Technician was responsible for calibration and maintenance of usual Westinghouse PWR instrumentation. Notable achievements included initial checkout and placing into service of the SSPS, Rod Control System, NIS, and much of the Reactor Protection System.                Designed and implemented a change to the SSPS which provided protection to the Source Range detectors.
Developed training/qualification programs for l&C technicians and trained l8C technicians prior to Training Department developing training programs.
~i969    11:                USES'-Etl tt          1 PP    t      9 Sgt      tg WSNS SP submarine. As Leading First      Class  Petty  Officer,  was responsible for conduct and scheduling of Electrical Section and approximately 10 subordinates.
EDUCATION:                  BSME, University of Delaware,        1985, with a concentration  in power generation.
'ROFESSIONAL:              Member of American Society of Mechanical Engineers Licensed Professional Engineer Ohio:            License 4 E53312 Michigan:        License 8 38856
 
Sgis is io Serfifg iPai
                          <3ii- mr6                . <ZeonarII))
gas SompMrh ter
              $ $ 8f($ <Squipmeni SeleL.lion anh
            <Relay <Evaluation Krnining Soursf Sell Kavember 17 19, 1992 Paul W. Hayes, MPR As ociates                            Richard G. Starck ll. MPR Associates J  Betlack, MPR Associates
 
R Gl U Gii                                      >>I)iJJ I)
                                                                  ~1 lf'8 JJ)J 8      0                                            ~l!)(I)
SIIis is Ia Seriifg IIIni II),I
        <Zir  ark        .  <Zeonmr6                            I)I)I]Ii gas (Gomplefeh lite Splat($ Belay <Evaluation Kraining Course                    .
IIIitJl Pelh Kauember        17,    199P
                                                              .  ')I)'iiI
                                                                  >llllpi 4
(()  )3 Betlack, hfPR Associates
                                                                  ~~llij(i 1~IIi
 
                                                                                  ~
j}IJJ
                          & Gl U Ca
                                                                                '~
                                                                                      >II)
                                                                                'JJIJJJi Kttis is ia Seriiftt tPat B,rr ark                        . <ZeonHrk gas Somplrirh iver $ $ 8lS.ioalkhautn Srrrrntng anh Srtsmtr Kttaluaiion Kraining Soursr Srih Slag 3-7, l993 Neil P. Smith. Commonwealth Edison SQUG  Chairman David h. Freed. MPR hssociates      Robert P. Kassawara. EPRI SQUG  Training Coordinator          SQUG  Program Manager
 
KAILASHC. blAHAJAN 1925 Laramie Drive Powell, Ohio 43065 Tel: (614) 791-0304 Qbj~~          To work as an Electrical, Iastrumentatioa and Controls Engineer ZZLKREHUl 1972 B.S. Electrical Engineering from the University of Indore, Iadia 1978 M.S. Electrical Engineering from M.S. the University of Baroda, India Registe~ Professional Engmeer ia the      states of OH, MI dc P ~
7/85 to 12/94 American Electric Power, Service Corporation, Columbus, OH Prepared design change packages including 10 CFR 50.59 safety evaluations, Appendix-R (Fire Protection), environmental/seismic qualification, engineering calculations, specifications and cost estimate. Reviewed and re-desigaed one-line diagrams.
Investigated existing Post Accident Monitoring System Compliances with and prepared modificaton scope based on NRC Reg. Guide 1.97. Worked on the resolution of USI A-46 (GL 87-02) safe seismic shutdown of existing plants.
7/84 to 7/85 Maine Yankee        & Clinton Nuclear Stations Involved in various assignments including to ensure a comprehensive approach to human engineering deficiency corrections per NUREG-700, equipment qualifications per IE Bulletin 79-01B, QA audit and surveillance, etc.
9/79 to 7/84 Bechtel Power Corporation Pnm    ~
Reviewed and approved. project design drawings. Resolved Geld problems and non-conforming reports. Prepared ladder diagrams for solid radwaste logic. Performed engineering calculations and prepared specifications for transmission systems.
1/75 to 7/78 Madhya Pradesh State Electricity Board, Karba, Xnd ia Prepared design calculatioas and specifications for sub-statioas. Involved in operation and maintenance of Thermal Power Plants.
 
Page 1  of 4 (Resume  of Paul  R. Krugh)
NAME & ADDRESS:            PAUL R. KRUGH 2075  Belltree Dr've Reynoldsburg,    OH  43068 COMPANY  POSITION:                    (Civil),  Senior COMPANY'ngineer            American    Electric  Power (AEP) 1 Riverside Plaza Columbus,  OH 43215 KEY UALIFIGATIONS:        Civil & structural;    seismic and structural dynamics.
EDUCATION:                B.S., Civil Engineering, Tri-State University, Angola, IN, 1962.
EXPERIENCE:
1983-1995  NUCLEAR SEISMIC AEP (Columbus, OH);    Civil/Seismic Engineer~
Served as an in-house consultant to the AEP Nuclear Organization (AEPNO) concerning ongoing seismic design, evaluation and cpxalification of equipment and structures at Cook Nuclear Plant.
Participated as a Seismic Capability Engineer [certified by the Seismic Qualification Utility Group (SQUG)j in the implementation of VSNRC USI A-46 (GL 87-02) at Cook Nuclear Plant.
Performed  in-situ  modal  testing of cabinets, panels, racks, etc. at  Cook Nuclear Plant.
Performed preliminary studies related to future renewal of seismic sensors and instrumentation at Gook Nuclear Plant.
Maintained liaison with other seismic consultants and seismic test laboratories.
1964-1983  ELECTRIC POKK TRANSMISSION LINES AEP (New  York City  & Columbus,  OH);  Civil/Transmission Line Engineer; Seniors Served as lead engineer/consultant for 138Kv, 345kv and 765Kv transmission line projects and affairs of Appalachian Power and Kentucky Power combined and later Indiana-Michigan Power.
 
Page 2  of 4 (Resume    of Paul R. Krugh)
Served as chairman of various task forces and committees, e.g., the      AEP transmission line design criteria including loadings and electrical clearances~ AEP T&D line and station conductor normal and emergency ampacity ratings~ AEP right-of-way vegetation control, etc..
Served as expert in the structural analysis and design of 34.5Kv through 138Kv wood-pole transmission line structures and the formulation of related hardware and material standards. Also expert in transmission line conductor vibration control (aeolian,      wake-induced oscillation, ice-galloping).
Served as a project and/or test engineer on a large number of test projects, e.g., ice dumping and unloading of 765Kv multi-conductor bundle, maintaining electrical clearances of 765Kv jumper loops through deadend tower windows, pile and foundation load tests, insulator hardware assembly proof load tests, conductor and static wire hardware proof load tests, guy cable and anchor rod hardware proof load tests, dynamic tests of hardware, etc.~ in some cases as part of the project, also designed the test equipment and rigging, e.g., for testing piling, hardware,    etc..
Heavily involved in the development, design and construction of the AEP 2000-mile 765Kv transmission line system (highest operating AC voltage transmission line system in the world) from its inception to near end of construction.
Contributed to implementing ongoing research, development, design, testing, etc. of 138Kv, 345Kv and 765Kv transmission line structures, foundations, anchorage and hardware.
Contributed to implementing special and unique research, conceptual development and cost studies for future 1000Kv+ (ultra high-voltage) transmission lines including joint research, testing and studies between AEP and Hydro Quebec.      Testing involved verification of multi-conductor bundle wake-induced      oscillation control (full-scale testing) and dynamic model  verification load tests on structural configurations of new conceptual type structures.
Served as  on-site field engineer assisting AEP operating companies during major emergencies,      e.g., the 1974 tornadoes with many towers  and lines  down.
1962-1964  ELECTRIC POKK TRAHSMISSIOH LIHES Ohio Power (Canton, OH); Civil/Transmission Line Engineers Served in Canton general office as engineer laying out, designing and upgrading electric power subtransmission and transmission lines throughout Ohio.
 
Page 3  of 4 (Resume  of Paul  R. Krugh)
Prepared construction specifications and drawings      for field  crews and contractors to follow.
PRIOR  to  1962  SURVEYIHG AHD CONSTRUCTION Gwin  Consulting Engineers (Altoona, PA) and various private engineers and surveyors including father~ Surveyor:
Participated part time    as survey  party member in a  substantial  amount of land, municipal and highway surveying including being a chainman, rodman and transit and level operator over a period of about 10 years.
Reese  Construction  Company  (Pittsburgh, PA); Laborer  and Equipment Operator:
Involved part-time as a laborer, truck driver, welder's assistant, etc.
in project of laying 15 miles of 10-inch diameter medium-pressure natural gas pipe line between Altoona and Tyrone, PA for The People' Natural Gas Company.
OTHER BACKGROUND    KE'ERIEHCE    TRAIHIHG AHD UALIFICATIOHSs Nuclear quality assurance  author of the AEPNO seismic procedures, various seismic specifications and seismic engineering guide materials, etc.. Also trained other engineers in seismic subject matter, e.g.,
SSFI 90/11.
Trained  in implementing in-situ transfer function method of modal testing, dynamic modeling and seismic dynamic analyses of equipment and structures. Performed modal testing of cabinets, panels, racks, etc. at Cook  Nuclear Plant  in  1985-1986 time frame.
Originator of idea    and suggestion for SQUG to adopt and use GENRS software method (as a derivative of EDASP software) for calculating in-cabinet and panel amplified response spectra related to SQUG seismic adequacy screening of electrical relays.
Participated in    SQVG walkdowns to verify seismic adequacy    of electrical and mechanical equipment at Cook Nuclear Plant.
Trained  in numerous  subjects, e.g., quality assurance,  root cause analysis, leadership    and teambuilding, etc..
Acquired and maintained certifications for full authorized access and as radiation worker at Cook Nuclear Plant (involved annual examinations for re-certifications including mandated participation      in fitness-for-duty program and ongoing random drug tests).
 
Page 4  of 4 (Resume of Paul R. Krugh)
Knowledgeable of computer applications, usage and programming (largely self taught and ongoing since about 1965)~ expert programmer in BASIC language including graphics.
Knowledgeable of electricity, electronics, radio communications, antenna design, antenna transmission line theory, calculation of antenna radiation patterns, etc.; have FCC Amateur 'Extra'lass radio operator and station license with present FCC-assigned call letters of N2NS; have been a FCC-licensed amateur radio operator since 1955 with former call letters  WN3BVE, W3BVE, WBEOE and WB2PBO.
Eagle Scout, woodsman and fisherman.
 
I Sifts ts ta tfertifg iltnf aul        <Z.      <>rug butts    Somplrlrh fllr SQCCS Blttlithotttn Srrrrntng ttnh Srtsmtr Kttttluttlton Srttining Soursr
                    <rrjplh    Otter 3 7 l963 slue Neil P. Smith, Commonwealth Edison SHRUG  hairman David A. Freed, MPR Associates        Robert P. Kassawara, EPRI SHRUG  Training Coordinator          SHRUG Program Manager
 
I-Chen Huan    - Senior Engineer, Structural      &. Analytical Design Section EXPERIENCE
 
==SUMMARY==
 
Engineering and design of various nuclear power plant steel and reinforced concrete structures for static and dynamic loads. Seismic analysis of buildings and equipment for generation of in-structure response spectra.
EDUCATION 1970          M.S.C.E., Worcester Polytechnic      Institute,  Worcester. Mass.
1966          B.S.C.E., Cheng-Kung University, Taiwan TRAINING 1992          SQUG Walkdown Screening and Seismic    Evaluation Training Course 1978          Westinghouse  PWR  Information Course 1977          Introduction to Plant Operation - PWR Simulator Program EXPERIENCE
 
==SUMMARY==
 
1984  to Present    American  Electric  Power Service    Corporation 1990  to Present    Senior Engineer Responsible    for seismic evaluation of design changes Conducted  site-specific qualification tests for the Hilti Kwik-II anchor bolts and the Drillco Maxi-Bolts 1984  to  1990      Design Engineer Designed various steel and reinforced concrete structures for both nuclear and fossil power plants.
1979  to  1984      Associated Technologies Inc., Clifton, NJ Senior Design Engineer,      worked as consultant to Duke Power Company on Catawba Nuclear      Project - Responsible for analysis and design of safety      related pipe supports and restraints.
1976  to  1979      Power  Authority of the State of New York Civil Structural Engineer on Indian Point 3 Nuclear Power Project - Responsible for coordination of design and construction of a four story Administration Building and a Receiving Warehouse.
1973  to  1976      Ebasco Services,    Inc.,  New  York,  NY Structural Engineer - Performed dynamic and static analyses    for the foundation mat, the containment building and the auxiliary building for WPPSS No. 3 and 5 Nuclear Project and generated floor response spectra for use by other disciplines.
 
I-Chen Huang page 2 1970 to  1973      Wolchuk and Mayrbaurl Consulting Engineers, New York, NY Structural Engineer - Performed analysis and design of the Cook Nuclear Plant main steam line rupture restraints which cantilevered off the outside of the concrete containment wall.
REGISTRATION Registered professional engineer (No. 51419) in the state of  New York, 1974 PUBLICATION Discussion on Approximate Stiffness and Bending Strength for Compact-Rolled Sections - AZSC engineering Journal 3rd quarter, 1986
 
tPILIF~lI'HII Siiis is lo G~eriifg iiini 3<
5          en:    511IHng
  )Bs SQmplrf.p6 'lgl'DQQlfg                  llnljtliogyn        ~~rrpr)ging anh Srismir Kunlnalion                G~r Hininq Sonrsr urrlli J~onr 22 26, 19l12 souG Neil P. Smith, Commonwealth Edison C
0 David A. Freed. MPR Associates        Robert. P. Kassawara. EVRI SQUG  Training Coordinator            SQUG Program Manager
 
MELVIN J. BASKERVILLE 4111 Sundance Drive Columbus, Ohio 43224 Home: (614) 475-2561 Office: (614) 223-1480 EXPERIENCE June 1979  Electrical/Physical Designer to present AMERICAN ELECTRIC POWER SERVICE CORPORATION COLUMBUS, OHIO
* Designed equipment locations and raceways for control, power, and instrumentation circuits for Donald C. Cook Nuclear Power Plant and miscellaneous coal-fired boiler power plants.
* Coordinated electrical design department activities during seismic qualification of raceway supports.
* Designed assignments per Appendix R criteria.
* Participated in engineering investigations.
* Performed quality assurance audits of in-progress equipment  installation  and maintenance.
* Ordered nuclear grade equipment.
* Designed electrical substations.
* Used computerized information systems to perform design and investigations.
* Created drawings using computer aided drafting and design (CADD).
EDUCATION  FRANKLIN UNIVERSITY    COLUMBUSI OHIO Bachelor of Science Degree, majored in Business Management. Graduated  April 1995.
COLUMBUS STATE COMMUNITY COLLEGE      COLUMBUS, OHIO Associate of Science Degree, majored in Business Management. Graduated March 1994.
REFERENCES Available upon request.
 
Sgis is io Seriifg  $ 1ini
                ~eluiu                  Smskerui)I)te gas Sompleleh lPe Sable Srag anh Sonhuil Baceiuag IIlorlion of lPe $ $ 8t($ Salhliotun Screening and Seismic ~kualualion toraining Sourse
                  <Sell Jejune 2P 26, 1992 souG Cable Tray and Conduit Raceway Only Neil P. Smith, Commonwealth Edison hai man
                    ~cZ SQUG David A. Freed, MPR Associates      Robert P. Kassawara, EPRI SQUG  Training Coordinator          SQUG  Program hianager
 
"1 '4" I l+
l 5'I+
 
Jey T. Sekaran 2369 Ridgeivood Dr.                            Home (616)-428-2912 Stcvensvillc. MI 49127                          Work (616)-465-5901 x1777 To obtain a Senior Civil or Structural engineer position ivhich offers opportunity for advancement..
MS Civil Engineering, South Dakota School of Mines and Technology.
Rapid City. South Dakota. 1983.
MS Structural Engineering. University of Madras, India, 1978.
BS Civil Engineering. University of Madras. India. 1976.
Industrial and povver plant structures. Seismic analysis of nuclear safety related structures, conduit and mechanical pipe supports, stress analysis of small bore piping, field ivalk down and design of conduit system. pipe supports and structural steel frames and concrete structures,stress analysis using finite element techniques.
I American Nuclear Resources, St. Joseph, Michigan American Electric Power, Columbus, Ohio Lead engineer for SQUG (Seismic Qualification UtilityGroup) at D.C.Cook Nuclear Power plant.
Responsible for the team performing visual and tcchnical evaluation of the anchorage of the major plant components required for the safe plant shut down.
Civil/Structural Engineer, D.C. Cook Nuclear Power plant.
Performed field walk doim, design, and qualification of conduit system, structural steel frames and platforms. Interfaced with contractor and other Indiana & Michigan Povver disciplines in solving field problems related to electrical conduit supports, installation of Structural steel frames and platforms and repairs in reinforced concrete structures.
Prepared maps for conduit installation and evaluation and disposition of Problem Reports and Condition Reports. Designed minor reinforced concrete structures, temporary structures such as scaffolding and tie downs.
M9khd255 Sargent    & Lundy Engineers,    Chicago, Illinois.
Structural Engineer at Clinton, Fermi, Byron and Braidivood Nuclear Power Plants.
Intcrfaccd with client, contractor and other Sargent &Lundy disciplines in solving field problems related to small and large bore safety related mechanical piping systems.
Performed stress analysis of small bore piping using hand calculations. Qualified frames, base plates and embedment plates by hand calculations and computer programs.
 
Responsibilities included generation of Field Engineering Change Notices, evaluation and disposition of Field Change Requests and Non-conformance Reports. Qualified structural steel members and connections in containment and other buildings and modified over stressed beams and connections .Designed concrete fioor slabs with composite beams.
              ~1978    1982
'arsen      Sc  Tubro Engineers (Nuclear Reactor suppliers and contractors of Industrial and  Popover  plant structures, Madras. India.)
CiviVStructural engineer in various projects.
Analyzed and designed the following Industrial and power plant structures for seismic and wind loads.
Equipment foundations, Reinforced concrete framed structures, chimneys, hoppers, conveyor structures & stock pile buildings, Reinforced and pre stressed concrete silos, Precast floor beams and floor elements.
co-author - "Development of optimized Epoxy graphite implant for the Total Hip Joints" Proceeding of the Twentieth Annual Rocky Mountain International Biocngineering Symposium held at Mayo Clinic, Rochester, Minnesota (1983) pp. 57-70. (Contributed three-dimensional analysis using finite element techniques.)
co-author - "Qxamic Loads on Transmission Line Towers", Proceedings of International Symposium on Earthquake Engineering held at university of Roorkec, India (1978)pp. 445-460 Male 39 years old, excellent health, willing to relocate.
Will be furnished upon request.
 
ittgis is io Serfifg iliad K ungHuelu J<ej338sekarmn gas Somplrlrh lgr SQQt($ Salkhotnn ~5crrrning anh Seismic <Sualualton Sraining Soursr 5rlh Slag 3 7, 1993 sGtl C3' Neil P. Smith. Commonwealth Edison SQUG  Chairman David A. Freed. MPR Associates      Robert l'. Kassawara. EPRI SQVG  Training Coordinator          SQUG Program Manager
 
APPENDIX C DONALD C. COOK NUCLEAR PLANT - UNIT 1 SCREENING VERIFICATION DATA SHEETS (SVDS}
(AS PER SQUG GENERIC IMPLEMENTATION PROCEDURE, SECTION 4}
 
Walkdown: Week            .d/25/93                                                            DC COO                                                                                                ,e1 of 1 SCREENING VERIFICATIO (JATA SHEET (SVDS)
Equp.to    Rev                                                                                              Bshe                  Capacity vs                                              Equip No. No                                                                                              Elev.                Demand Basta                              OK7            OK7 1 4/IRV-210    0              I M/UM STEAM STEAM GENERATOR                      E MAINSTEAM STOP ENCLOSURE, IM THE                        Judgme% vs Restate Median OMM.1 STOP VALVE                                MIDDLESW REGN OF THE RM.                                Cantered Aoor Rs        S 0  MAINSTEAM I STEAM GENERATOR                      W MAINSTEAM STOP ENCCLOSURE, IN THE                      Judgment vs Raafisdc MochaA    Y4$    Yos      Yes OME3-2 STOP VALVE                                MIDDLES REGN OF THE RM.                                Cantered Aoor Res      eS 144/IV@30      0  M/Nt STEAM I STEAM GENERATOR                    W MAIN STEAM STOP ENCCLOSURE, OM          633.00  N/A    udgment vs Reahstic Median                                      Yes OMEGA STOP VALVE                                MIDDLEN REGN OF RM.                                    Centered Aocr Rs        S 1 44RV-240    0  M/uM STEAM I STEAM GENERATOR                    E SOuM STEAM STOP ENCLOSURE. IM THE      633.00  N/A    Judgment vs Reahshc Meehan    Yes OME~ STOP VALVE                                  MIDDLENW REGN OF THE RM, 13'W OF 639                    Centered Aaor Response Spectra EL PLATFORM ENTRANCE lADDER NEAR THE CONT WAIL 1  OME44E    0  ESW/ EAST ESW PUMP PP 7E      SCREENHOUSE 591.00 E ESW PUMP RM,                            587.00  N/A    Judgment vs Reahst/c Meehan    Y4$              Yes              Yos DISCHARGE STRAWER                                                                                        Centered Fkor Re        S 1 OME      0  ESW/WEST ESW PUMP PP 7W      SCREENHOUSE 591.00 W ESW PUMP RM,                            587.00  N/A    Judgment vs Reahstlc Meehan 34W        DISCHARGE STRAINER                                                                                      Cantered Aoor Rs 1%ME%9        0  MAINSTEAM/AUXILIARYFEED        AUXILIARY 591.00 TB DRIVEN AUX FDWTR PMP, IM THE SW        609.00  N/A    Judgment va Reshsuc Msc/ian    Yes    Yes      Yes      Yos    Yos PUMP TURBINE AND GOVERNOR                        CORNER OF THE RM, 3 FT WEST OF TDAFP 81 ~              Cents/ad Fkor Response Spectra VALVE                                            PPP 14tc  12  0  BORON MAKEUP (CVGS)/NOR1'H      AUXIUARY  567.00 BORIC Acro STORAGE TANKAREA, IM THE NE    587.00  M/A    Judgment vs Rsahstio Meehan            Yes      Yes      Y4$    Yes BORC ACID FILTER                                REGN OF THE RM, 4' OF N BORIC ACID                      Cantered Acor Response Speci/a STORAGE TANK8 1-TK 12N, 4'BOVE FLR 147-100-      0  DIESEL COMBUSTION AllAB        GROUNDS  609.00 INNER PLANT GROUNDS, 20 NW OF UNIT 1                      Judgment VS Reahstio Meehan    Yes    Yes      Yes              Yes AB        EMERG DIESEL AIR INTAKEFILTER                    CONT DOME                                              Centered Aoor Re        S 10          WIT.100-      0  DIESEL COMBUSTION Al/CD        GROUNDS  609.00 INNER PLANT GROUNDS. 5(7 SW OF            60IL00  N/A    Judgment vs Raahstlc Meehan    Yes                        Yes    Yes CO        EMERG DIESEL AIR INTAKEFILTER                    REFUELIMG WATER STORAGE TANK                            Cantered Roar Re        S 1<7.104-      0  DIESEL COMBUSTION AIIAB        GROUMDS  609.00 INNER PLANT GROUNDS, 2(r NW OF UNIT-1      608.00  M/A    Judgment vs Restate Meehan                      Yss      Y4$    Yes AB        EMERG DIESEL EXHAUST                            CONT DOME                                              Centered Acor Response Spectra SILENCER 12            1 427.104-  0  DIESEL COMBUSTIOMAIICD          GROUNDS  609.00 INNER PLANT GROUNDS, 5tr SW OF                            Judgment vs Reshstlc Median    Yes    Yes      Yos      Yss    Yes CO          EMERG DIESEL EXHAUST                            REFUEUNG WATER STORAGE TANK                            Cantered Aoor RospoAso Spoctnl SILENCER 13          124tE 19N      0  GVCS (BORON RECOVERY I NORTH  AUXIUARY  587.00 N BORIC ACID EVAPORATOR RM. IN THE        587.00  N/A    Judgment vs Reahstc Median                                Yes BORIC ACID CONCENTRATOR UNIT                    CENTER OF THE RM                                        Centered Root Response Spectra SIOD ANO FRAMfNG 124IC4    0  SPENT FUEL PIT COOU I SPENT                    SPENT FUEL PIT FILTER RM, IM THE CENTER                  Judgment vs Reahstic Meehan    Yos                        No      No FUEL PIT FILTER                                OF THE CUBIC(E IN THE NE CORNER OF THE                  Cantered Fkor Response Spectra SPENT FUEL PIT HEAT EXCHANGER RM
.15            12-TK-207    0  NffROGEM (REACTOR PL I        GROUNDS  609.00 REACTOR GAS BOTTLE STORAGE AREA, IN                      Judg/AOAt vs Raahshc Median    Yos                      Yes REACTOR PlANT NfTROGEN BULK                    THE MIDDLEOF THE SOUTH REGION OF THE                    Centered Fkor Response Spectra STORAGE TANKS 83,4,5,6,7,8                      ROOM, 35 FEET NORTHWEST OF THE AUX609 CRANEBAYROLLUP DOOR. 6FEETABOVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatofy should be a licensed professional engineer.)
Print or T pe Nalne                              Si nature                      Date                      Print or T pe Name                            Si nature                    Date
 
Walkdown:
Item  Eq. CI Ikx
                    .wt Outages Eqep.lD  Rsv No 0  ELECTRICAL DISTRIBUT/600VAG                587.00 DCCO            .iT1 SCREENING VERIFICATION DATA SHEET (SVDS)
HALLWAY,IN THE NE END OF THE HALLWAY,      587.00  N/A
                                                                                                                                                      ~      vs.
Demand Base 1.5 x Bounding Spectrum vs.
Csp >
Demand?
Yes    Y45 Anctmr OK?
Yes
                                                                                                                                                                                                  .ge1 of 10 Yos Equip OK?
Yes MCC AB4i                                            10FT S OF STARTUP SLOWDOWN FIASHTANK                    Rearedc Mergan Centered Fkxx RM ENTRANCE DOORS. NEAR THE E WALl                              Response S 2      1                0  ELECTRICAL DISTRIBUT/600VAC                587.00  HALLWAY,IN THE NE REGN OF THE HAllWAY, 587.00      NIA    1.5 x Boundng Spectrum vs.              Yos                  Yes MCC AEQ                                            20 FEET S OF THE STARTUP SLOWDOWN                        R4$ 3$ 5c Meccan Centered Fkor FLASHTANKRM DOOR. NEAR THE E WALL                                R        6 0  250 VDC CONTROL AND I CONTROL    AUXIUARY  587.00  HALLWAY,2 FEET E OF THE N STAIRWAY, N              N/A    1.5 x Boundsig Spectrum vs.              Yos  Yas    Yes      Yes CENTER VALVE                                        THE N END OF THE HALLWAY                                Rearisdc Merfian Centered Fker R        6 0  ELECTRICAL OISTRIBUT/600VAC                587.00  AB EDG RM, IN THE NWREGN OF THE RM,                        1.5 x Bouncy Spectrum vs.        Yes    Yes  Y45    Yes      Yes MCC ABD4                                            NEAR THE N WALL                                          Rearegc Median Centered Floor R        8 5      1                0  ELECTRICAL OISTRIBUT/600VAC      AUXILIARY  587.00  AB EOG RM, N THE NW REGN OF THE RM,                        1.5 x Boundeg Spectrum vs.        Yos MCC ABDe                                            NEAR THE N WALL                                          Reare5c Median Centered Fkor R
6                        0  ELECTRICAL DSTRIBUT/600VAC                  609.00,  IN THE SW CORNER OF THE RM, ON THE S                      1.5 x BoundrXI Spectrum vs.            Y45                  Yes MCC ABD4'                                          WALI 10FT SW OF CD EMERGENCY DIESEL                      Reassdc Merfian Centered Fkor GENERATOR 4147ME 1504'0                                          Re      S
                                                                                                                                                    ~
ELECTRICAL DSTRIBUT/600VAC                  609 00  4KV RM-600V SWGR. N THE SW CORNER OF        609 00        1.5 x Boundrig SpocrUril v5. Yes MCC ABD47                                          THE RM, ON THE SO. WAU 10FT SWOF CD                      Real'egc Marfen Centered Fkor EMERG. DIESEL GENERATOR 8147ME-150GO                              Re      Spectra 0  ELECTRICAL DSTRIBUT/600VAC                  587.00  HAlLWAY,N THE NE END OF THE HALLWAY,                        1.5 x          Spectrum vs.                  Yes            Yos Vcc ABYE                                            BFT NE OF N BORIC ACID EVAPORATolt                        Raaredc Median Centered Fbor SUBPANEL 412-BAEN, NEAR N WALLWALL                                R        8 1~VD      0  600V AC DISTR I Mcc 1~47                    587 00  HAllWAY,N N REGN OF HALLVzAY,"0 FEET S      587 00        14 x Boundng Spectnsn vs.        Yes    Yes OF RADIOCHEMICALDRAIN nt-1 2-TK4I NEAR                    Rearegc Median Centered Fker THE W WALL                                                        Res      S 10    1                0  ELECTRICAL DSTRSUT/600VAG                  633.00  HALLWAY,NEAR THE W WALlOF THE                              1.5 x Boundeg Spectrum vs.      Yes    Yos    Yes            Yes MCC AM%                                            HALLWAY,9FT S OF CONT AUX SUB PNLS 1                      ROSTsdc Median Centered Fkor CAS                                                              Res      S      5 0  ELECTRICALDISTRIBUT/600VAC                  633.00  HALLWAY,IN THE MIDDLEN SECTION OF THE              N/A    Ls x Bounding S pctfUrilvs.            Yos          Yes      Yes MCC AM47                                            HALLWAY,12FT S OF THE UNIT 1 CONTROL                      Reassuc Merfen Centenld Fkor RM EMERGENCY EXIT DOOR, NEAR 'THE W                              Response Spectra WAlL 12    1      14lZ4IC    0  ELECTRICAL DSTRIBUT/600VAC                  609.00  HALLWAY,20 FT. SE OF CONTROLLED AREA                      1S x Boundng Spactnsn vs.                      Yes            Yos MCC AZ4IC                                            ENTRANCE FIRE DOOR 5124IRv4 UX391, 5                    Rearetic Merren Centered Fkor FEET E OF THE N STAIRWAY, NEAR THE N                            Response Spectra WALL
                                                                                                                                                    ~
13      1                0  ELECTRICAL OSTRIBUT/600VAC      AUXILIARY  587.00  HALLWAY,10 FT NW OF BORIC ACID              587.00        1.5 x Boundsig Spectnsn  vs.      Yas          Yes            Yss Vcc AZVA                                            BATCHING TANK8 1 2-TK-1 3, NEAR THE N WALL              Realistic Median Centered  Fkgr R        8 14      1                0  ELECTRICAL DiSTRIBUT I 600VAC              613.00  4KV RM, Mezzanine Area. IN THE NWAREAOF                    1.5 x          Spectrum vs.            Yss  Yes            Yos MCC EZCA                                            THE RM, 10FT S OF THE N WALL                            Reareuc Median Centered    Floor Re        S 15      1                0  ELECTRICAL DISTRIBUT I 600VAG              613.00  4KV RM, Mezzanine Area, IN THE NWAREAOF                    1.5 x Boundng Spectrum  vs. Y45          Yes    Y45 Mcc Ezce                                            THERM,4FEETS OF THE NWALl                                Realetic Morrian Centered  Fkcr Re        S 16      1                0  ELECTRICAL DSTRIBUT/600VAG      AUXILIARY  613.00  4KV RM. Mezzanine Ares. N THE SW REGN OF                    1.5 x Brxeding Spectrum vs.      Y45          Yes    Yos MCC EZCC                                            THERM,4FEETNOF HTESWAlL                                  Reafstic MaSan Centered Roor Re        Spectra Cerofication:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                            Si nature                          Date                    Print or T  Name                                      ture                Date
 
Watkdown:              wl Outages                                                            DC CO          IT 1                                                                                  age 2 of 10 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. CI  Equp.lo    Rev    System/Equipment Descripten              Flocr                                              Base                  Capacity vs.            Cap>    Csvosts            Equ'<<I No. No                                              Ebv.                                                Elev.                Demand Basis            O<<nsnd7  OK7    OK7        OK7 17                        0  ELECTRICAL DISTRIBUT/600VAC                613.00 4KV RM,Mozzsn't>>Area. IN THE SWREGNOF                      1.5  x Bounding Spectnm vs.        Yes      Yes  Yes  Yes    Yos MCC EZC43                                        THERM,BFTEOFTHEWALI 2FTSOF480V                            Roatstb M<<fisn Centered Roar Ac MCC 1 PHC-2                                                    R        S 18              14'SA    0  ELECTRICAL DISTRIBUT I 600 VAC SCREENHOVSE 594.00 TRAVELINGSCREEN Mcc UPPER RM, 10 FEET        587.00  N/A  1.5 x Bounding Spoctnm vs.          Yes      Yos  Yes          Yos Mcc 14'SA                                        SW OF THE Rhll'8 ENTRANCE DOORWAY, ON                    Rotc M<<rien Centered      Fker THE W WALL                                                        R        S 1+84I    0  ELECTRICAL DISTRIBUTI600VAC    SCREENHOVSE 594.00 TRAVELINGSCREEN MCC UPPER RM, ON W          587.00  N/A  1.5 x Bouefirg Spectnm va                          Yos  Yes    Yes MCC 1+$ 0                                        WALL,2 FEET S OF THE RM'S ENTRANCE                        ROSMc M<<ssn Centered Fker DOOR                                                              R 1.11A    0                        I ELECTRICAL DISTRIBUT 600VAC                609.00 4KV RM 600V SWOR, IN THE SW REGION OF                      1.5 x Bounding Spectrum vs.                  Yos  Yes  Yes    Yes BUS 11A SWITCHGEAR                                THE RM. 7 FT WEST OF NORTH PLANT                          ReaMc Median Centered Fker UGHTING TRANSFORMER &#xb9;I-TR4TGBN                                    R        S 21              1.11A1    0  ELECTRICAL DIST/UBUT I REACTOR            609.00 4KV RM - 600V SWOR, IN THE SW REGION OF                    1.5 x Bounding Spoctnm vs.          Yes      Yes  Yes  Yes ROD CONTROL SOUIH MOTOR-                          THE RM. ON 600VAC SWGR &#xb9;1-11A, 6 FT                      R445sdc Median Centered Fker GENERATOR SET CRDMG-1 S                          ABOVE THE FLR                                                    Response Spectra SUPPLY BREAKER 1-11A10    0  ELECTRICAL DISTR!BUT/ WEST      AUXILIARY 609.00 4KV RM - 600V SWOR, IN THE SW REGION OF                    1.5 x Boimding Spectnsn vs.        Yes                .Yes    Y44 TURB NE AVXIUARYCOOUNG                            THE RM, IN600VAC SWGR &#xb9;1-11A. 1 FT ABOVE                  Res/istic M<<fian Centered Fbor WATER PUMP PP-14W SUPPLY                          THE FLR                                                          Response Spectra BREAKER 1  11A11  0  ESW/600VAC BUS 11A SUPPLY        AUXILIARY 609.00 4KV RM, 600V SWGR Area. N THE SW REGN                      1.5 x Boundirg SprKtrum Va          Yes BREAKER                                          OF THE RM, N 600V Ac SWOR <<1-1 1A, 6FT                    Rotc M<<fisn Centered      Fker ABOVE THE FLR                                                    R        6
                                                                                                                                                    ~
24            1-11AI2    0  ELECTRICAL DISTRIBUT /600VAC              609.00 4KV RM-600V SWGR. IN THE SW REGION OF                      1S x Bounhrg Spectnsn vs.                              Yes    Yes BUS 11A SPARE CIRCUIT BREAKER                    THE RM, N 600VAC SWGR &#xb9;1 11 A, 5 FT ABOVE                Rotc Median Centered      Fbor THE FLR                                                          Re        S 1-11A13    0  ELECTRICAL DIST/UBUT I 600VAC              609.00 4KV RM 600V SWOR, N THE SW REGION OF                      1.5 x            Spectrum vs.      Yes      Yes  Yes  Yes    Yes MOTOR CONTROL CENTER A@At                        THE RM, IN 600VAC SWGR &#xb9;I-11A. 3 FT ABOVE                ResMc Median Centered Fker SUPPLY BREAKER                                    THE FLR                                                          R 1.11A2    0  ELECTRICAL DISTRIBUT/600VAC                609.00 4KV RM, 600V SWGR Area, N THE SW REGN                      1.5 x Bounding Spectrum vs.        Yes      Yes                Y4S MCC AM% SUPPLY BREAKER                            OF THE RM, ON 600V Ac SWGR <<1-11A. 5FT                    ROOMc M<<fian Centered Fbor ABOVE THE FLR                                                    R        6 27              1.11A3    0  ELECTRICAL DISSTRIBU I 600VAC              609.00 4KVRM.600V SWGRArea, N THESWREGN                          1.5 x Bounding Spectrum vs.        Yes      Yos  Yos MCC EZCA SUPPLY BREAKER                          OF THE RM, ON 600VAC SWOR<<1-11A, 1FT                      Rotc      Median Centered Fker ABOVE THE FLR                                                    R        S 28              1  11A4  0  ELECTRICAL DISTRIBUT/SOUTH                609.00 4KV RM-600V SWGR, IN THE SW REGION OF                      1.5 x Bounding Spectrum vs.        Yes      Yes  Y44  Yes    Yes PLANT UGHTING TRANSFORMER                        THERM. ON 600VAC SWGR <<1 11A, 5 FT                        Rotc      M<<rien Centered Fbor TR4.TG48 SUPPLY BREAKER                          ABOVE THE FLR                                                    Response S 1-11AS    0  ELECTRICAL DISTRIBUT I 600VAC              609.00 4KV RM,600V SWGR Aroa, N THE Sw REGN                      1.5 x Boueurg Spoctnm vL                    Y44        Yos    Yos Mcc ABDASUPPLY BREAKER                            OF THE RM, ON 600V AC SWOR <<1.11A, 3FT                    Rosrissc Median Centered Fker ABOVETHE FLR                                                      R        S      a 1-11AS    0  ELECTRICAL DISTRIBUT I600VAC    AUXILIARY 609.00 4KV RM, 600V SWOR Area, N THE SW REGN                      1$ x Bounding Spectrum vs.                  Yos  Yos Mccs tuLA. ps', Tpp~ AND                                                      &#xb9;
                                                                                                                                                    ~
OF THE RM, ON 600V Ac SWGR I 11A, 1FT                    Ressstc M<<fisn Centered Fker VCCS ABYEAZVASUPPLY                              ABOVE THE FLR                                                    Response Spectra BREAKER 31              1  11A7    0  ELECTRICAL DISTRIBUTI SERVICE    AVXIUARY  609.00 4KV RM 600V SWGR, IN THE SW REGION OF                      1.5 x            Spectnm vs.                Yos  Yos          Yos BUEDNG UGHTNG                                    THE RM, ON 600VAC SWOR <<1-1 1A, 6 FT                      Resrissc Median Centered Fker TRANSFORMER 12.TR4.TG-1 4                        ABOVE THE FLR                                                    Response Spectra SUPPLY BREAKER Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
                                                                                      )2. C(r      lSS Print or T pe Name                              Si nature                      Date                      Print or T pe Name                                Si  a  re              Date
 
Waikdown:              al Outages                                                              DC COO          iT1                                                                            age 3 of 10 SCREENING VERIFICATION DATA SHEET (SVDS) kern  Eq. Gi  Equip.lo  Rev                                                Fker                                                                                                      Axle/
Cap>                    Equip Na      No                                                Elev.                                                                                          DemarxP      OK7          OK7 1  11AB        ELECTRICAL DISTRIBUT /600VAC        AUXILIARY      4KV RM 600V SWGIL N THE SW REGION OF        609.00  N/A  1.5 x Boundng S pact/um vs.                Yes  Yes    Yes BORIC ACID HEAT TRACE                                THE RM, N 60OVAC SWGR &#xb9;1-11A, 5 FT ABOVE                  Reakssc Mersan Centered Fker CONTROL CENTER BHTW SUPPLY                          THE FLR                                                          Response Spectra BREAKER 1-11A9    0  ELECTRICAL DSTRIBUr I TSC            AUXILIARY      4KV RM -600V SWOR. N THE SW REGION OF        609.00  N/A  1.5 x Bourx4rg S pact/um vs. Yes  Yes  Yes  Yes    Yes UNNTERRUPTABLE PWR SOURCE                            THE RM, N 600VAC SWGR &#xb9;1.11A, 3 FT ABOVE                  Realisdc Median Centered Roar EMER FEED CONSTANT VOLTAGE                          THE FLR                                                          Response Spectra TRANSFORMER    12-TSC4PSCVl'UPPLY BREAKER 34      2      1.11AC    0  ELECTRICAL DISTRIBUT/600VAC.          AUXILIARY      4KV RM,600V SWOR Area, IN THE S W REGN                    1$ x Boundng Spearum    vs.          Yes        Yes    Yes BUS 11A TO 600VAC. BUS 11C TIE                        OF THE RM, ON 600VAC. SWGR &#xb9;1-1 tA, 5FT.                  Reakssc Mafian Centered  Roor BREAKER                                              ABOVE THE RR                                                    Response S      a 1 118        ELECTRICAL OISTRS VT I 600VAC                        4KVRM 600VSWGR,NTHESEREGIONOF                              1.5 x Bourxhng Spectrum  va    Yes  Yes  Yes          Yes BUS 118 SWITCHGEAR                                    THE RM                                                    Rear>>dc Me/fian Centered  Boor Resoor>>e S 36      2      1-1181        ELECTRICAL DISTRIBUT I 600VAC                        4KV Rhk 600V SWOR Area. IN THE SW REGN      609.00  WA    1$ x Souring Spectrum    vs. Yes  Yes        Yes    Yes MCC ABDe SUPPLY BREAKER (1-                          OF THE RM, 6FT ABOVE THE FLR                              Rear>>dc Metfian Centered  Fker ELSC                                                                                                                  Resoa>>e Spectra 37      2      M1810          ELECTRICAL OISTRSUT I PLANT          AUXILIARY      4KV RM 600V SWGR, N THE SE REGION OF                      1.5 x Boundng Spectrum  vs. Yes  Yes        Yes    Yes AIR COMPRESSOR OMEQ1 SUPPLY                          THE RM, 0 N 600VAC SWGR &#xb9;1-118, 1 FT                      Reattsdc Merrian Centered Fker BREAKER                                              ABOVE THE FLR                                                    R        6 36      2      1-1 181'I  0  ELECTRICAL DISTRIBUT I600VAC          AUXILIARY      4KV RM,600V SWGR Area, IN THE SE REGN OF    609.00  N/A  1.5 x Boundng Spect/um va      Yes        Yes          Yes BUS 118 SUPPLY BREAKER                                THE RM, ON 600V Ac SWOR &#xb9;1-118, 6FT                      Rest>>dc Median Centered Boor ABOVE THE FLR                                                    R 2    1-11812      0  ELECTRICAL DISTRSUT/SOUTH                            4KV RM -600V SWG/L N THE SE REGION OF                      1.5 x Bandng speci/um vs.            Yes        Yes    Yes NONESSENTIAL SERVICE WATER                            THE RM, ON 60OVAC SWGR &#xb9;1-118, 5 FT                      Real>>uc Median Centered Boor PUMP PP4kq SUPPLY BREAKER                            ABOVE THE FLR                                                    Re        S 40      2      1.11813    0  ELEGTRCAL DISTRIBUT I TURBINE        AUXILIARY      4KVRM 600VSWGR,INTHESEREGIONOF              609.00  WA    1.5 x Bandng    Spectrum vs. Yes  Yes  Yes  Yes    Yes ROOM INDUCTION HEATNG,                                THE RM, ON 600VAC SWGR &#xb9;1-118, 3 FT                      Rear>>uc Median  Centered Roor STRESS REUEF AND BOLT                                ABOVE THE FLR                                                    Response  Spect/a HEATERS SUPPLY BREAKER 41      2      1-1182    0  ELECTRICAL DISTR!BUT/600VAC          AUXILIARY      4KV RM,600V SWGR Area. IN THE SW REGN        609.00  N/A  1.5 x Boundng Spectrum va      Yes  Yes        Yes    Yes MCC EEOC SUPPLY BREAKER                              OF THE RM. N600VAC SWGR &#xb9;4I, SFT ABOVE                    Reatstic Mafiian Centered Roor THE FLR                                                          Re      eS 42      2      1.1183    0  ELECTRICAL OISTRIBUT/EAST            AUXILIARY      4KVRM 600VSWGR. N THE SE REGION OF                        1.5 x Bandng Spect/um vs.      Yes  Yes        Yes    Yes AND WEST AVXIUARYBVILDNG                              THE RM, ON 600VAC SWGR &#xb9;1 118. 1 FT                      Rea>>dc Median Centered Boor CRANES 12<MME AND 12<M4W                              ABOVE THE FLR                                                    Response Spec/ra SUPPLY BREAKER 1-1184        ELECTRICAL DISTRSVT I 600VAC          AUXILIARY      4KV RM. 600V SWGR Area, IN THE SE REGN OF    609.00  N/A  1.5 x Bandng speci/um vs.      Yes  Yes  Yes  Yes    Yes MCC AZ4IC SUPPLY BREAKER                              THE RLL 0 N THE 600VAC SWOR &#xb9;1-118, 5                    Rest>>sc Mectian Centered Roor FEET ABOVE THE FLR                                              R 44      2      1-1185        ELECTRICAL DISTRIBVT/600VAC          AUXILIARY      4KVRM 600VSWGR.NTHESEREGIONOF                609.00  N/A  1.5 x Boundng Spectrum vs.      Yes  Yes  Yes MOTOR CONTROL CENTERS TBG-                            THE RM, ON 600VAC SWOR &#xb9;1-118, 3 FT                      Rear>>sc Median Centered Rcor BE AND TB P4ntv SUPPLY BREAKER                        ABOVE THE FLR                                                    R        Spect/a 1-1186    0  ELECTRICAL OSTRSVTI EAST              AUXILIARY      4KV RM -600V SWGR, IN THE SE REGION OF                    1.5 x Boundng Spectrum vs.            Yes                Yes TURBINE AUXILIARYCOOUNG                              THE RM, ON 600VAC SWGR &#xb9;1-11 8, 1 FT                      Real>>sc Mecsan Centered Fker WATER PUMP PP-14E SUPPLY                              ABOVE THE FIR.                                                  Respcnse Spectra BREAKER 1-11 87    0  ELECTRICAL DISTRSUTI PLANT                          4KV RM 600V SWGR, N THE SE REGION OF        609.00  N/A  1.5 x Boundng Spearum vs.            Yes HEATING BOILER FORCED DRAFT                          THE RM, N 600VAC SWOR COMPARTMENT &#xb9;1-                    Rear>>dc Merfun centered Boor FAN 12<ME 1OFAN SUPPLY                              118                                                              Respa>>e Spectra BREAKER Certification:
Allthe information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" inctudes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                                  Si nature I z/'/ef Date                      Print or T pe Name                                n  ure              Date
 
Walkdown:              .wl Outages                                                            DC CO        .IIT 1                                                                                  age 4 of 10 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Q    Equp.lo    Rev                                              Fker                                                                                          Cap >  Caveats Ancntv            Equip No.      No                                              Ekrv.                                                                                        Demand?  OK?    OK?              OK?
47              1-1188    0  ELECTRICAL DISTRIBUTI MAKEUP                609.00 4KV RM 600V SWGR. IN THE SE REGION OF                      1.5 x Botadeg Specuum vs.                    Yos PLANT VACUUMDEGASIFIER 2ND                        THE RM, ON 600VAC SWOR &#xb9;1-1 18, 5 FT                      ROSMc Metrisn Centered Fker STAGE VACUUMPUMP 12&P~M                            ABOVE THE FLR                                                    Response Spectra SUPPLY BREAKER 2        1-1189    0  ELECTRICAL OISTRIBUT I 600VAG              609.00 4KV RM -600V SWOR, IN THE SE REGION OF                    1.5 x Boundeg Spectnsn vs. Yes    Y8$    Y8$      Y8$    Yes BUS 118 SPARE CIRCUIT BREAKER                      THE RM. ON 600VAC SWOR &#xb9;1.1 18, 3 FT                      Resrngc Merfisn Centered Boor ABOVE THE FlR                                                    R 49              1-11BD      0  ELECTRICAL DISTRIBUTITIE                    609.00 4KV RM. 600V SWOR Area. IN THE SE REGN OF                  1.5 x Bounding Specuum vs. Yas    YOS    Y8$      Yes    Y8$
CIRCUIT BREAKER BETWEEN BUS                        THE RM, ON 600VAC SWOR &#xb9;1-118, 5 FEET                    Reaiisdc Median Centered Fker 118 AND 110                                        ABOVE THE FLR                                                    R 1-11C      0  ELECTRICAL DISTRIBUT I 600V BUS            609.00 4KV RM-600V SWOR, IN THE SW REGION OF                      1.5 x Boundng Specuum vs.      Yes    Yes              Yes 11C SWITCHGEAR                                    THE RM                                                    Rsaragc Merfian Centered Boor Response S 51              1-11G1      0  ELECTRICAL DISTRIBUT I 600VAC                609.00 4KV RM, 600V SWGR Area, IN THE SW REGN                    1.5 x Boundeg Spocuunl vs. Yes    Yes BUS 11C SUPPLY BREAKER                              OF THE RM. ON 600VAC. SWOR &#xb9;1 11C, 6FT                    Rearnsc Me@an Centered Boor ABOVE THE FLR                                                    Ra      S 2      1-11010      0  ELECTRICAL DISTRIBUT I 600VAC                609.00 4KV RM. 600V SWGR Ares, N THE SW REGN                      1.5 x Boundeg Specuum  vs. Yes    YOS    Yes      Yes    Yes MCCS ABDG AND TSC4 SUPPLY                          OF THE RM, IN 600VAC SWOR &#xb9;1-11C, 1 FT                    Rearndc Median Centered  Boor BREAKER                                            ABOVE THE FlR                                                    Re 2      1  11C11    0  ELECTRICAL DISTRIBUT/600VAG        AUXILIARY 609.00 4KV RM 600V SWOR, IN THE SW REGION OF                      1.5 x Bacldng Specuum  vs.                            Yes BUS 11C SPARE CIRCUIT BREAKER                      THE RM. N 600VAC SWGR &#xb9;1-11C. 6 FT ABOVE                  ROSMc Median Centered    Boor THE FLR                                                          Re      S 2      1-11C12      0  ELECTRICAL DISTR!BUT I NORTH                609.00 4KV RM 600V SWGR. IN THE SW REGION OF                NIA  1.5 x Bounceg specuum  va    Yes    Yes              Yes SPENT FUEL Pn'UMP 124'P41N                          THE RM, N 600VAC SWOR &#xb9;1 11C, 5 FT ABOVE                  ResMc Median Centered    Fker SUPPLY BREAKER                                      THE FLR                                                          Res      S 2      1.11G13      0  ELECTRICAL DISTRIBUT I CIRCUIT    AUXIUARY  609.00 SWOR RM, N THE SW REGN OF THE RM                    NIA  1.5 x Bouixung Spectrum vs. Yss    Yos              Yss BREAKER4KNVFOR                                                                                                ROSMc MorfIsn Centered  Fker RECRIPROCATNG CHARGING                                                                                              Response Spectra PUMPt+P<9 2    1.1 1G14      0  ELECTRICAL OISTRIBUT I FIRE                  609.00 4KV RM-600V SWOT IN THE SW REGION OF                      1.5 x Boundeg Specuum vs.              Yes    YOS      Yes    Yes PROTECTION WATER HIGH                              THE RM, IN 600VAC SWOR &#xb9;1 11C, 1 FT ABOVE                ROOMc Median Centered Boor DEMANDPUMP PP-11 SUPPLY                            THE FlR                                                          Response Spectra BREAKER 57      2      1-11G15      0  ELECTRICAL DISTRIBUT I                      609.00 4KV RM 600V SWOR, IN THE SW REGION OF                      1.5 x Boundng Specuum va              Yes TECHNICALSUPPORT CENTER                            THE RM, N 600VAC SWOR &#xb9;1-1 1C, 6 FT ABOVE                RoaMc Median Centered Boor UNINTERRUPTABLEPOWER                                THE FLR                                                          Response Spectra SUPPLY NORMAL      SUPPLY BREAKER 2      1-11G16      0  ELECTRICAL DISTRIBUT/600VAC      AUXIUARY  609.00 4KV RM 600V SWOR, IN THE SW REGION OF                NIA  1.5 x Boundeg Spectnsn vs.                              Yes    Yes MOTOR CONTROL CENTERS TBC-                          THE RM. N 600VAC SWOR &#xb9;1-11C. 5 FT ABOVE                  ReaMc Median Cantered Boor CS AND TBGGW SUPPLY BREAKER                        THE FLR                                                          R 2      1-11G17      0  ELECTRICAL OISTRIBUT I NORTH                609.00 4KV RM-600V SWGR, IN THE SW REGION OF                      1.5 x Boundeg Spectrum  vs.            YOS NONESSENTIAL SERVICE WATER                        THE RM, N 600VAC SWOR &#xb9;1-1 1C, 3 FT ABOVE                ReaMc Medhan Centered    Fker PUMP PP4N SUPPLY BREAKER                          THE FLR                                                          Re 2      1-11G18      0  ELECTRICAL DISTRIBUT I TURBINE    AUXILIARY 609.00 4KV RM 600V SWGR, IN THE SW REGION OF                NIA  1.5 x Boundeg Spectrum  vs.                            Yes    Yes BUILDNG240r50 TON OVERHEAD                        THE RM. N 600VAC SWOR &#xb9;1-11C, 1 FT ABOVE                  Rearsdc Meccan Centered  Boor CRANE 12AM-1 SUPPLY BREAKER                        THE FlR                                                          Re      S 61              1.11C2      0  ELECTRCAL DISTRIBUT  I            AUXILIARY 609.00 4KV RM 600V SWGR, IN THE SW REGION OF                      1.5 x Bounceg spacuum  vs.                            Yes    Yos CONTAINMENTPOLAR CRANE QM-                        THE RM. ON 600VAC SWOR &#xb9;1 11C, 5 FT                      Resrnsc Median Cantered  Fker 4 SUPPLY BREAKER                                  ABOVE THE FLR                                                    Re      S      8 Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
i Z((~ ~+~                                                                                                )2    Z.O Print or T pe Name                                  S'ature                        Date                      Print or T pe Name                                  ture                    Date
 
Walkdown:            . Cal Outages                                                            DC CO .      NIT1                                                                                      Page  5of10 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. CI  Equ'p.lo            syst<<n/Equipmont escriptxe No.                                                                                                                                                        CSp >            Anchor          Emu'K7 Dernand7          OK7 1-11C3    0  ELECTRICAL D ISTRIBVTI 600VAC              609.00 4KV RM 600V SWGR, IN THE SW REGION OF                      1.5 x Boundeg Spect/um vs.              Yes        Yss MOTOR CONTROL CEN7ER AMES                          THE RM. ON 600VAC SWGR <<1-1 1C, 1 FT                      Rearrsdc Mecssn Centered Fkor SUPPLY BREAKER                                    ABOVE THE FLR                                                    R        6 1-11C4    0  ELECTRICAL DISTRIBUT I            AUXILIARY 609.00 4KV RM 600V SWGR, IN THE SW REGION OF                      1.5 x B0UAdeg Spec/U/n va        Yes    Yss        Yss CIRCUlATINGWATERTRAVEUNG                          THE RM, ON 600VAC SWGR &#xb9;1.11C, 5 FT                      Roassdc Median Centered Fkor SCREENS NORTH WASH PUMP 12-                        ABOVE THE FLR                                                    Response Spectra PP-1 5N SUPPLY BREAKER 1-11G5    0  ELECTRICAL DISTRIBUTI MAKEUP      AUXILIARY 609.00 4KV RM - 600V SWGR, IN THE SW REGION OF                    1.5 x Boundeg S pact/Um va              Yss        Yss    Yes    Yes PLANTVACUUMDEGASIFIER                              THE RM, ON 600VAC SWGR <<1.11C, 3 FT                      Rearrsdc Median Centered Fker STANDBYVACUUMPUMP                                  ABOVE THE FLR                                                    Response Spectra 12'4W SUPPLY BREAKER 1-1106    0  ELEGTRCAL DISTIUBUTI600VAC                  609.00 4KVRM,600VSWGRA/ea,lN THESWREGN                            1S x Boundeg Spectrum vL          Yes    Yss      Yes Mcc EZCC SUPPLY BREAKER                            OF THE RM, ON THE 600VAC. SWGR &#xb9;1-11C,  1                Realrsdc M<<fian Centered Fkor FOOT ABOVE THE FLR                                              R        S 1-11C7    0  ELECTRICAL DISTRIBUT I 600VAC                609.00 4KV RM 600V SWGR, tN THE SW REGION OF                      1.5 x Bourxleg Spsct/Um VS.      Yes              Yes      Yes    Yes BUS 11C SPARE CIRCUIT BREAKER                      THE RM, IN 6OOVAC SWGR <<1 'l1C, 6 FT ABOVE                Rearudc M<<fian Centered Fkxx THE FLR                                                          R        6 67              M108      0  ELECTRICAL 0ISTRIBUT I SERVICE              609.00 4KV RM-600V SWGR. IN THE SW REGION OF                      1.5 x Boundeg Spectrum va BUILDOIGAND CONTAWMENT                              THE ILLIN 600VAC SWGR &#xb9;1-11C. 5 FT ABOVE                  Roaltsdc M<<fart Centered Boor STANDBYUGHTING                                      THE FLR                                                          Response Spectra TRANSFORMER TR4TGe SUPPLY BREAKER 1-11C9      0  ELECTRICAL D ISTRSUT I MAINAND    AUXILIARY 609.00 4KV RM - 600V SWOR. IN THE SW REGION OF                    1.5 x Boundeg Spectrum vs.        Yes    Yes SPARE TRANSFORMER                                  THE RM, IN 600VAC SWGR <<1 11C. 3 FT ABOVE                Reassdc Mecrun Centered Fkor AUXIUARIESNORMAL
                                                                                                                                                    ~
THE FLR                                                          Response Spectra DISTRIBUTIONCABINETTCSN SUPPLY BREAKER M10        0  ELECTRICAL 0ISTRSUT I 600VAG      AVXIUARY  609.00 4KV RM 600V SWGR, IN THE SE REGION OF                      1.5 x          speci/Um vs.      Yes                              Yes BUS 11D SWITCHGEAR                                  THE RM                                                    Reasstic Median Centered Fkor Re      6      a 70      2      1-1101      0  ELECTRICAL DISTRIBUT/60QVAG        AUXIUARY  609.00 4KV RM. 600V SWGR Area. tN THE SE REGN OF                  1.5 x Boundeg 6 pectnsn vs.      Yes    Yes BUS 11D SUPPLY BREAKER                              THE RM. ON 600VAC. SWGR &#xb9;1-11D, 5 FEET                    Reatsdc M<<fian Centered Fbor ABOVE THE FLR                                                    Re      S      a 71      2    1-11010      0  ELECTRICAL DISTRSUT I NORTH        AUXILIARY 609.00 4KV RM 600V SWOR, IN THE SE REGION OF                      1.5 x Boundeg Spect/um vs.              Yos      Yss PLANT UGHTtNG TRANSFORMER                          THE RM. ON 600VAC SWGR  &#xb9;I 11D, 1 FT                    Restage M<<futn Centered Fkxx TR4.TGBN SUPPLY BREAKER                            ABOVE THE FLR                                                    Re      SS      a 72            1  11011    0  ELECTRICAL DISTRIBUT I600VAC      AUXILIARY 609.00 4KV RM 600V SWGR, IN THE SE REGION OF                NIA  1.5 x Boratdeg Specuurn vs.      Yes    Yes      Yss      Yes    Yes BORIC ACID HEAT TRACE                              THE RM. ON 600VAC SWGR  &#xb9;I 11D. 6 FT                    Reststic M<<fun Centered Floor CONTROL CENTER BHT47 SUPPLY                        ABOVE THE FLR                                                    Response Spectra BREAKER 2      1  11013    0  ELECTRICAL DISTRIBUTIREACTOR      AUXILIARY 609.00 4KV RM - 600V SWGR, IN THE SE REGION OF                    1.5 x Boundeg Spect/um vs.        Yes    Yes                        Yes ROD CONTROL NORTH MOTOR-                            THE RM, ON 600VAC SWGR &#xb9;1-110, 3 FT                      Rearrsdc Macron Centered Floor GENERATOR SET CRDMG-1N                              ABOVE THE FLR                                                    Response Spect/a SUPPLY BREAKER 74    2      1-11014      0  60OV Ac DISTR I 600VAC Mcc 14QP    AUXILIARY 609.00 4KV RM, 600V SWGR Area, IN SE REGN OF THE            NIA  1.5 x Boundeg S pecuum vs.              Yes      Yes      Yes D, VCC 14BVO, MCC 1+$ 47                            RM. ON 600VAC SWGR 1.11D, 1 FT ABOVE                      Rsatstic Median Cent<<ed Fkor SUPPLY BREAKER                                      THE FUL                                                          R 75      2      1-11D3      0  ELECTRICAL DISTRNVTI              AUXILIARY 609.00 4KV RM 600V SWGR, IN THE SE REGION OF                NIA  1.5 x Boundeg Spectrum vs.        Yes                              Yes CONTAINMENTUGHTBIG                                  THE RM, ON 600VAC SWGR <<1-11D. 1 FT                      Realusc M<<fun Centered Fker TRANSFORMER TR4.TG-t 0 SUPPLY                      ABOVE THE FLR                                                    Response Spectra BREAKER Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
tel    I4 lct5 Print or T pe Name                                Si nature                        Date                      Print or T pe Name                              Si  ature                      Date
 
Waikdown:            .cal Outages                                                                            DC CO ..<IT 1                                                                                          ~ .age 6 of 10 SCREENING VERIFICATION DATA SHEET (SVDS)
Equp.lO    Rev No.      No Floor Elsv.
Base Bev.
Capaaty vs.
Demand Basis Cap >
Demand?
Caveats OK?
Anchor OK?
E~
OK?
76            1.11D4      0  ELECTRICAL DISTRIBUT/600VAC                                        4KV RM -600V SWGR, N THE SE REGION OF        609.00  N/A  1.5 x Bounding Specuum    vs.                    Yes      Yes BUS 11D SPARE CIRCUIT BREAKER                                      THE R/iL ON 600VAC SWGR N-110, 5 FT                        ROOSstic M<<fian Centered  Fbcr ABOVE THE FLR                                                      R        Spectra 1-1105      0  ELECTRICAL DISTRIBUT I 600VAC                    AUXILIARY 609.00 4KVRM,600V SWGR Area, IN THE SE REGN OF                    1.5 x Bounding Spectnsn  vs.                              Yes    Yos Mcc ABOO SUPPLY BREAKER                                            THE RM. N 600VAC. SWGR &#xb9;1-110, 3 FEET                      ROOSsdc M<<fian Centered    Fbor ABOVE THE FLR                                                      Res              a 78            1-11D6      0  ELECTRICAL DISTRIBUT/600VAC                        AUXILIARY 609.00 4KV RM, 600V SWOR Area, N THE SE REGN OF                    1.5 x Bounding Spectrum  vs.                    Yss      Yos    Yes Mcc EZGO SUPPLY BREAKER                                            THE RM, N 60OVAC SWGR ABOVE THE FLR
                                                                                                                            &#xb9;I 11D, 1 FOOT                    Rotc      Median Centered  Fker R        8 1-11D8      0  ELECTRICAL DISTRIBUT I 600VAC                                      4KV RM, 600V SWGR Area, N THE SE REGN OF                    1.5 x Boundeg Spec&#xb9;um    va MCC ALSO SUPPLY BREAKER                                            THE RM, N 600VAC SWOR &#xb9;1 11D, 5 FT ABOVE                  ROOMc M<<fian Centered      Fbor THE FLR                                                            Response S 1-1109      0  ELECTRICAL DISTRIBUT I MAINAND                                      4KV RM 600V SWGR, N THE SE REGION OF                        1.5 x Boundstg Spectrun  vs.                    Yes      Yes    Yes SPARE TRANSFORMER                                                  THE RM, ON 600VAC SWGR &#xb9;1 11D, 3 FT                        ROOS$ 6c M<<fian Centered  Fbor AUXILIARIESEMERGENCY                                                ABOVE THE FLR                                                      Response Spectra DISTRIBUTIONCABINETTCSE SUPPLY BREAKER 61          142+ YA      0  REACTOR TRIP BREAKER I                            AUXILIARY 609.00 CRD EQUIP RM, N THE MIDDLEWEST REGION                      1.5 x Boundey spearum vs.          Yss    Yes              Yes REACTOR ROD CONTROI.                                                OF THE RM, ON26cV150VAC ROD CONTROL                        ReaSstb M<<fian Cenlerod Roar
                                                                                                                                  &#xb9;I-TRAIN'A'EACTOR TRIP BYPASS CIRCUIT                                      MOTORNENERATOR SET SWGR                                            Response Spectra BREAKER                                                            CRDSWGR. 3 FT 142<Ye        0  ROD CONTROL AND INST I                            AUXILIARY 609.00 CRD EQUIP RM, ON 260II 50 VAC ROD                          1S x Bounding Spscfufil vs.                      Yes              Yes REACTOR ROD CONTROL TRAIN                                          CONTROL MOTOR~NERATOR SET SWGR                            ReaSstic MaSan Centered Fker Ttup BYPASS CIRCUIT          '8'EACTOR
                                                                                                  &#xb9;14'RDSWGR. NEAR THE FLR                                          Response Spectra BREAKER 1424tTA      0  ROD CONTROL AND NST I                                              CRD EQUIP RM, N THE MIDDLEWEST REGION                      1.5 x Bounding Spearum vs.        Yes            Yes      Yes    Yos REACTOR ROD CONTROL    TRAIN'A'EACTOR OF THE RM, N BREAKER COMPARTMENT &#xb9;1-                      ROOSstb Median Centered    Fker TRIP CIRCUIT BREAKER                                      52&TA, 3 FT ABOVE 'THE FLR                                        R        S      a 1424tTB      0  ROD CONTROL AND NST I
                                                                                                                                                                      ~
CRD EQUiP RM, IN THE MIDDLEWEST REGION        609.00  WA    1.5 x Bounding  spearum vs.        Yes            Yes      Yes    Yes REACTOR ROD CONTROL    TRAIN'8'EACTOR OF THE RM, N BREAKER COMPARTMENT &#xb9;1                        ReaMc Median    Centered  Fker TRIP CIRCUIT BREAKER                                      524178. NEAR THE FLR                                              Response  S 1 T11A      0  ELECTRICAL DISTRIBUT/4KVBUS                        AUXILIARY 609.00 4KVRM A84KVSWGR, INTHESEREGIONOF                            1.5 x          Spearum  vs.      Yes                      Yes    Yos T11A SWITCHGEAR                                                    THE RM. 5 FT NE OF THE Rhrs ENTRANCE DOORWAY Rotc      M<<fian Centered  Fker Re        S 1.T1 1A1    0  ELECTRICAL DISTRIBUT I SOUTH                      AUXIUARY  609.00 4KV RM -AB 4KV SWOR, IN THE SE REGION OF                    1 4 x Bounding Spectrum  VL                                      Yes SAFETY NJEGTION PUMP PP.26S SUPPLY BREAKER THE RM. N 4KV SWGR &#xb9;1-T11A, NEAR THE FLR                  Rotc      M<<San Centered  Fker Res      S      a 67          1  T11A10    0  ELECTRICAL DISTRIBUT I 600V BUS                    AUXIUARY  609.00 4KV RM, AB 4KV SWGR RM. N THE S E REGN                WA    1.5 x Bounding Speansn    vL                                Yes    Yos 11A SUPPLY TRANSFORMER TR11A                                        OF THE RM, N 4KV SWGR &#xb9;1-T11A, NEAR THE                    Reasstic Median Centered  Fbor SUPPLY BREAKER                                                      FLR                                                                Response S      a 1.T11A1'I    0  ELECTRICALDISTRIBUT I AB                                            4KV RM, AB 4KV SWOR RM. N THE SE REGN                      1h x Bounding Spoc&#xb9;um    vs.                              Yes    Yes EMERG DIESEL GENERATOR TO                                          OF THE RM, IN 4KV SWGR &#xb9;1 T1 1A. NEAR THE                  Res/istic Mecsan Centered  Fker 4IOI BUS T11A SUPPLY BREAKER                                        FLR                                                                R        Spectra 1-T11A12      0  ELECTRICAL DLSTRIBUTICIRCUIT                      AUXILIARY 609 00 4KV RM, N THE NE REGN OF THE RM                            1.5 x Boundrig Specuum    vs.                              Yos    Yos BREAKER FROM 69kv TO BUS T11A                                                                                                  Rearistic M<<fian Centered  Fker R        8 1.T'llA2    0  ELECTRICAL DISTRIBUTIWEST                          AUXILIARY 609.00 4KV RM, AB 4KV SWGR RM, IN THE SE REGN                      1.5 x Bounding Spec&#xb9;um vs.                        Yes      Yss MOTOR DRIVAUXFEEDWATER                                              OF THE RM, N 4KV SWGR &#xb9;1-T11A. NEAR THE                    ROOMc Median Centered Fker PUMP PP4W SUPPLY BREAKER                                            FLR                                                                R        8 91            1-T11A3      0  ELECTRICAL DISTRIBUT I WEST                        AUXILIARY 609.00 4KV RM AB 4KV SWGR. IN THE SE REGION OF                    1h x Boundeg    Spectrum vs.                                      Yes CONTANMENTSPRAY PUMP PP-9VV SUPPLY BREAKER THE RM, IN 4KV SWGR &#xb9;1-T11A. NEAR THE FLR Rotc M<<fian Centered      Fbor R        Spectra Certification All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                                                  S'ature lz      zo Date                      Print or T pe Name                                i    ture                    Date
 
Walkdown:            .ical Outages                                                                      DC CO        HIT 1                                                                              cage 7'of 10 SCREENING VERIFICATION DATA SHEET (SVDS)
Equp.lo      Rev                                            Buadstg.                    Room or Row/Cok/mn No.      No Capac/ty vs.            Cap >      Ancrgr          Equp Depend Basis            Dam<<xi?      OK?            OK?
1-T11A4      0  ELECTRICAL DISTRIBUT/WEST                AUXILIARY 609.00 4KV RM. AB 4KV SINGR RM, IN THE SE REGN      609.00        1.5 x ourxfirg Spact/um vs.      Yes  Yes  Yas    Yas    Yes RHR PUMP PP45W SUPPLY                                      OF THE RM, IN 4KV SWOR &#xb9;1-T11A, NEAR THE                  Raarrc BREAKER Median Cantered  Fkor FLR                                                              Re        S      a 1.T11AS      0  ELECTRICAL DISTRIBUTI WEST                AUXILIARY 609.00 4KV RM. AB 4KV SWGR RM, IN THE SE REGN        609.00  N/A  1.5 x Boundeg Spectnsn  vs.                        Yes    Yos ESW PUMP PP-7W SUPPLY                                      OF THE RM, IN 4KV SWOR &#xb9;'I-T11A. NEAR THE                  ResKstic Median Cantered  Rear BREAKER                                                    FLR                                                              Re        S      a 1.T11A6      0  ELECTRICAL DISTRIBUT/4KVBUS                AUXILIARY 609.00 4KV RM AB 4KV SWOR, IN THE SE REGION OF              N/A T11AT04SOV PRESSUfuZER 609.00        1.5 x Bourxsng Specuum  va THE RM. IN 4KV SWOR &#xb9;1-T11A, NEAR THE                      ReaMc Mecfan Cantered    Roor HEATER BUS SUPPLY XFMR TR11A                                FLR                                                              Response Spectra PHA SUPPLY BRKR 1.T11A7      0  ELECTRICAL DISTRIBUT I WEST                          609.00 4KV RM, AS 4KV SWOR RM. IN THE SE REGN        609.00        1.5 x Boundeg Spect/um vs.        Yes  Yes  Yas            Yos CCW PUMP PP-1 OW SUPPLY                                    OF THE RM, IN 4KV SWOR &#xb9;1-T11A. NEAR THE                  ReaMc hlaclan Centered Fkor BREAKER                                                    FLR                                                              Re        S      a 1-T11AS      0  ELECTRICAL DISTR!BUT I WEST                AUXIUARY  609.00 4KV RM, AB 4KV SWGR RM. IN TEH SE REGN                      1.5 x Soundly Spectrum va                    Yes    Yas CENTRIFUGALCHARGING PUMP                                    OF THE RM                                                  ReaMc Median Cantered Fker PPCOW SUPPLY BREAKER                                                                                                        Res      OS      a 97      3    1-T11A9      0  ELECTRICAL OISTRIBUT I1KVBUS              AUXILIARY 609.00 4KV RM - AB 4KV SWOR. IN THE SE REGION OF    609.00        1.5 x 80Uhdlfg Spt/l//ri VL      Yos  Yes  Yes    Yos    Yes 1A To 4KV BUS T11A TIE BREAKER                              THERM, IN4KVSWGR &#xb9;1 T11A, NEARTHE                          ReaMc M<<fian Centered Fker FLR                                                              Re      SOS      a 4KV RM - AB 4KV SWOR, tN THE NW REGION
                                                                                                                                                              ~
1.7118      0  ELECTRICAL DISTRIBUT I 4KV BUS                      609.00                                                            1$ x Boundng Spect/um vk                Yes          Yes    Yos T118 SWITCHGEAR                                            OF THE RM, 20 FT NORTH OF THE Rhr S                        ReaMc Median Cantered Fker ENTRANCE DOOR                                                    Response S 1.T1181      0  ELECTRICAL DISTRIBUT/4KVBVS                AUXILIARY 609.00 4KV RM - AB 4KV SWOR. IN THE NW REGION        609.00        1S x            Speci/um vs.      Yes  Yes  Yes    Yes    Yos 18 To 4KV BUS Tl1 8 TIE BREAKER                            OF THE RM, IN 4KV SWOR &#xb9;1-T118, NEAR THE                  Reafsdc Median Cenlered Fkor FLR                                                              Response S 100    3      1  T1182      0  ELECTRICAL DISTfUBUTI                                609.00 4KV RM. AB 4KV SWOR RM. IN THE NW REGN        609.00        1.5 x Soundly Spect/um va CIRCUll'REAKER                                                                                                                  Yes  Yes  Yes    Yes    Yes FROM 6gkV BUS TO BUS                              OF THE RM, IN 4KV SWOR &#xb9;1.T118, NEAR THE                  ReaMc Macron Centered Fker Tl1 8                                                                                                                        R          8 101    3      1-T1184      0  ELECTRICAL DISTR/BUT/AB                    AUXILIARY 609.00 4KV RM, AB 1KV SWGR RM, IN THE NW REGN        609.00  N/A  1.5 x Bounchng Spectrum vs,            Yes                  Yes EMERG DIESEL GENERATOR TO                                  OF TEH RM, IN 4KV SWOR &#xb9;1.T1 1 8. NEAR THE                ReaMc Median Cantered Fbi 4IOI BUS T11 SUPPLY BREAKER                                FLR                                                              R          8 102      3      1 T11C      0  ELECTRICAL OISTRIBVTI 4KV BUS              AUXILIARY 609.00 4KV RM CD 4KV SWGIL IN THE NE REGION          609.00        1.5 x Bounding Spoor/um vs.            Yes  Yas    Yes    Yes T11C SWITCHGEAR                                            OF THE RM, 25 FT NE OF THE Rhrs ENTRANCE                  ReaMc Median Cantered Fkor DOOR                                                            Res        S      a 103      3    1-T1 1 cl    0  ELECTRICAL DISTRIBVTI 4KV BUS              AUXILIARY 609.00 4KV RM - GD 4KV SWGR. IN THE NE REGION        609.00        1.5 x Boundrrg  Specuum vL              Yos  Yes    Yes    Yes 1C To 4KV BUS T11C TIE BREAKER                              OF THE RM, IN4KVSWOR &#xb9;1-T11C, NEAR THE                    ReaMc Median    Centered Roor FLR                                                              Response  S      a 104      3    1.T11G2      0  ELECTRICAL DISTRIBUTI CIRCUIT                        609.00 4KV RM, IN THE SW REGN OF THE RM                            1$ x Boundng    Spect/um va                  Yes    Yes    Yas BREAKERAKVFROM 69kv TO BUS                                                                                            ReaMc Median    Centerod Fkor Tl 1c                                                                                                                        Ra        S 105      3    1-T11G3      0  ELECTRICAL DISTIUBUTI CD                            567.00 4KV Rhl, Co 4KV SWOR RM, IN THE NE REGN              NIA  1.5 x Bourxsng  speci/um vL      Yos  Yes  Yes            Yes EMERG DIESEL GENERATOR TO                                  OF THE RM, IN 4KV SWOR &#xb9;11 Tl 1 c, NEAR                    ReaMc Median    cant<<ed Floor 4KV BUS T11C SUPPLY BREAKER                                THE FLR                                                          Response  S 106      3      1 T11D      0  ELECTRICAL DISTRIBUTI 4KV BUS              AUXILIARY 609.00 4KV RM CD 4KV SWOR, IN THE SW REGION          609.00  NIA  1.5 x Bounding  Speci/um vs.      Yes  Yes  Yes    Yes    Yes T110 SWITCHGEAR                                            OF THE RM, 20 FT SE OF THE RhrS ENTRANCE                  ReaMc M<<san Cantered Roar DOOR                                                            R          8 107    3      1  T1101      0  ELECTRICAL DISTfUBUTI CIRCUIT              AUXILIARY 609.00 4KV RM. C04KV SWOR RM. IN THE SWREGN                  N/A  1.5 x Bounding Spectrum vs.            Yas          Yes    Yes BREAKER 4kv FROM 69kv FEED TO                              OF THE RM, NEAR THE FLR                                    ReaMc hlecfan Centered Roor BUS T110                                                                                                                    Res        S 106      3    1.T11010      0  ELECTRICAL DISTRIBUT I EAST ESS            AUXILIARY 609.00 4KV RM, CD 4KV SWGR RM, IN THE SW REGN                      1.5 x Bounc4rg Spectnsn vL                          Yes    Yes SERVICE WATER PUMP 1+P-?E                                  OF THE RM                                                  ReaMc hl<<san Cantered Rcor SUPPLY BREAKER                                                                                                              Response Spectra Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
IZJr~ AS Print or T pe Name                                          Si nature                        Date                      Print or T pe Name                                i  ature                Date
 
Watkdown:                  ical Outages                                                          DC COG.        IT 1                                                                                      wage 8 of 10 SCREENING VERIFICATION DATA SHEET (SVDS)
Equp.lo          Rev    System/Equipment Descripten No.      No Capacity vs.          Gsp > Caveats    Anchor            Eve Demsnd Basis          Demsnd7  OK7        OK7              OIQ 3    1-T11D11          0  ELECTRICAL DISTRIBVTI EAST        AUXILIARY      4KV RM, CO 4KV SWOR RM, IN THE SW REGN      609.00  N/A  1.5 x Bandng S pact/um va        Yes    Yes      Yes      Yes MOTOR DRIVEN AUXILLARYFEED                      OF THE RM, IM THE 4KV SWGR &#xb9;1-T110, NEAR                  Rearndc Mafian Centered Boor WATER PUMP PP4E SUPPLY                            THE FLR                                                          Response Spectra BREAKER 110    3    1  T11D12          0  ELECTRICAL OISTRIBUT/4KVBUS                      4KV RM CD 4KV SWGR. IN THE SW REGION        609.00  N/A  1.5 x Boundng Spectrum vs.              Y45  ~    Yes      Yes    Yes 1D TO 4KV BUS T11D TIE BREAKER                  OF THE RM, IN 4NI SWGR &#xb9;1-T11D, NEAR THE                  Rsarisdc Mtxfisn Centered Fker FlR                                                              R        Spectra 3    1-T11D2          0                        I ELECTRICAL DISTRIBUT 600V BUS                    4KV RM, CO 4KV SWGR RM, IN THE SW REGN      609.00  N/A  1.5 x Boundng Spectrum vs.              Yes        Y85      Yes    Yes 11D SUPPLY TRANSFORMER                            OF THE RM. IN 4KV SWGR &#xb9;1-T110, NEAR THE                  Rsarsdc Median Centered Fker TR11D SUPPLY BREAKER                              FLR                                                              Re        S      8 112    3    1.T11D3          0  ELECTRICAL D ISTRIBUT I CIRCUIT                  4KV RM, IN SW REGN OF THE RM, IN 4KV                      1.5 x Bandng Spectrum vs.        Yes    Y85                        Yes BREAKERAKVCCW PUMP-MAST                          SWGR &#xb9;1-T11D, NEAR THE FLIL                              Res/istic Median Centered Fker SUPPLY BREAKER                                                                                                      Re        S      8 113    3    1.T1104          0  ELECTRICAL DISTRIBUTI EAST                        4KV RM CD 4KV SWGR, IN THE SW REGION        609.00  N/A  1.S x Bounding Spectnsn ve.              Yes                Yes    Yes CONTAINMENTSPRAY PUMP PP4IE                      OF THE RM, IN 4N/ SWGR &#xb9;1.T11D, NEAR THE                  ROSTSSc Mafian Centered Floor SUPPLY BREAKER                                    FLR                                                              R        S 114      3    1.T11D5            0  ELECTRICAL DISTRIBUT/NORTH                        4KV RM CO 4KV SWOR. IN THE SW REGION        609.00  N/A  1.5 x Boundng Spectrum vs.              Yes      Yes              Yes SAFETY N/ECTION PUMP PP-26M                      OFTHERM,IN4KVSWGR&#xb9;1.711D, NEARTHE                        Resristic Median Centered Fker SUPPLY BREAKER                                    FLR                                                              R        6 115      3    1-T11D6            0  ELECTRICAL OISTRIBUTI EAST                        4KV RM. IM THE SW REGN OF THE RM            609.00  N/A  1.5 x Boundng Spectrum vs.        Yes  Yes        Y85      Yes    Yes RHR PUMP PP45E SUPPLY BKR                                                                                  Rearisdc Median Centered Boor Re        S 116      3    1-T11D7            0  ELECTRICAL DISTRIBUTIEAST          AUXILIARY      4KV RM, IN THE NE CORNER OF THE RM,          609.00  N/A  1.5 x Bandng Spectrum vs.        Yes  Yes        Yes CENTRIFUGAL CHARGlNG PUMP 1-                      NEAR THE CEILB/G.                                        Rearisdc Me/fish Centered Fkor PP40E SUPPLY BREAKER                                                                                                R        6 117      3    1.711DB            0  ELECTRICAL 0 ISTRI BUT I CD        AUXILIARY      4KV RM, CO 4KV SWGR RM, IN THE SW REGN      609.00  N/A  1.S x Bourxfng Speotrum vs.      Yes  Yes        Yes  . Yes EMERG DIESEL GENERATOR TO                        OF THE RM, IM 4NI SWGR &#xb9;1-T11D, NEAR THE                  Reatstic Median Centered Roor 4NI BUS T110 SUPPLY BREAKER                      FLR                                                              Response S 116    3    1-T'11D9          0  ELECTRICALOISTRI BUT/4KVBUS                      4KV RM CO4KV SWG/L 0/ THE SW REGION          M900    N/A  1.5 x Bandng Spectrum vs.        Yes  Y85        Yes T1 1D TO 460V PRESSURIZER                        OFTHERM,IN4N/SWGR&#xb9;t-Ttto, NEARTHE                        Reasstic Moifian Cenlered Floor HEATER BUS SUPPLY XFMR                            FLR                                                              Response Spectra TR11PHC SUPPLY BRKR 119          14:RID4-                    CONTROL ROOM IM I 10KVA      AUXILIARY      4KV RM,600V SWGRArea, IN THE SE REGN OF      633.00  N/A  1.5 x Bandng S pact/um n.              Y85        Y45 Cvl'4 TRANSFORMERCONSTANT                              THE RM. 7 FEET S OF 600VAC BUS 11B                        Resristic Median Centered Fker VOLTAGE                                          SUPPLY TRANSFORMER &#xb9;1 TR119                                      Re        S      8 RID-II    0  120VAG DISTRIBUTION/120VAC        AUXIUARY      4KV RM. 600V SWGR Ares. IM SE REGM OF RM. 633.00  N/A  1.5 x Bandng Spectrum vL                Yes        Y45      Yes    Yes CVT                CR INST DISTR CH41 tSOL COMT.                    7'W OF 600VAC BUS 11B SUPPLY TRANST&#xb9;                      Resristic Median Centered Fker 121              Cvl'20V 14'RIO411-          0 VOLT TRANSF 120V CONTROL ROOM IN I 10 KVA 1.TR11B 4KV RM. 600V SWGR Area. IN THE SE REGN OF    633.00  N/A Response S 1.5 x Bandng Spectrum vs.        Yes  Y45        Yes              Y45 CVT                ISOLNITER <ONSTANT VOLTAGE-                      THE RLL 7 FEET SE OF 600VAC BUS 11B                      Rearisdc Median Centered Fker TRANSFORMER                                      SUPPLY TRANSFORMER &#xb9;1-TR11 B                                      R        6 14RID4V.            0  120V CONTROL ROOM IN I 10KVA      AUXILIARY      4KV RM. 600V SWGR Ares, IN SE REGN OF THE    633.00  N/A  1.5 x Bandng    Spectrum vs. Yes  Yes        Yes              Yes
                                                                                                                                                                  ~
ISOLNITER- CONSTANT VOLTAGE                      RM. 7 FEET SE OF 600 VAC BUS 11B SUPPLY                  Rearistic Median  Centered Fker TRANSFORMER                                      TRANSFORMER &#xb9;1-TR11 B                                            Re        S 1 4XlAB-          0  DIESEL GENERATION, C I AB                        AB EDG RM, IN MIDDLEN REGM OF RM. 5 FT. E    587.00  N/A  1.5 x Boundng    Spectrum vs.          Yes                  Yes    Yes FFCKT              EMERGENCY DIESEL GENERATOR                        OF ru/rS DOORWAY, INS IDE N SIDE OF AB                    ROSMc MtxQn                Fker OME-15INIB FIELD RASH CIRCUIT                    EMERG DIESEL GEN CONT SVBPANEL 1-                                Response Spectra TRANSFORMER                                      DGAB. 2'BV FLOG 124          14XSCD-            0  DIESEL GENERATION. C I CD                        CD EDG RM, IN MIDDLES REGN OF RM, S W        567.00  N/A  1.5 x Bandng Spectrum vs.        Yes  Yes        Yes              Y45 FFCKT              EMERGENCY DIESEL GENERATOR                        OF CD EMERG. DSL GEN RM DOORWAY.                          Rearistic Mecrian Centered Fbor OME.1 SOCD FIELD FIASH CKT                        INStDE CO EMERG OSL CTRL SVBPNL 147GCD,                          Response Spectra TRANSFORMER                                      NEAR FlR Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
                                                                                          >Zlt ~l~S Printor T pe Name                                      Si nature                      Date                      Print or T pe Name                                n  ure                        Date
 
Walkdown:                Ical Outages                                                            DC CO          .(IT 1                                                                              age 9 of 10 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl    Equp.lo      Rev                                                                                                  Base                                            Cap >  Caveats            EIFN No.        No                                                                                                  Elev.                                                  OK?                OK?
Demand?
1.TROD          0  120/220V CONTROL AND I            AUXIUARY  587.00 CO EDG RM, IN MIDDLENE REGN OF RM, 10              Yes  15 x Boundeg Spectnsn vs.          Yss    Yes        Yes    Yes AUXIUARYFEEDWATER                                  FT. NW OF CD EMERG DIESEL GEN &#xb9;14?ME-                    ROSMc M<<ftan Centered Roar 12OI208VAC DIST PNL AFW SUPPLY                    150CO, NEAR N WALL                                              Response Spectra TRANSFORMER 1.TR<LSG        0  120V/220 CONTROLAND/120r208      AUXIUARY  587.00 AB EDG RM, N THE NE CORNER OF THE RM,                    1$ x Bouasng Spectrum vs.          Yes          Yes  Yos    Yes VAC EMERGENCY LOCAL                                ON THE E WALI4FEET ABOVE THE FLR                        ROOILstic M<<reran Cantered Roar SHUTDOWN DISTRIBUTION                                                                                              Response Spectra TRANSFORMER 127            1.TR11A      0  ELECTRICAL DISTRI BUT/600VAG      AUXILIARY 609.00 4KV RM, 600V SWGR Area, IN THE NW REGN              No    1$ x Boundeg Speanel vs.                    Yes                Yes BUS 1 1A SUPPLY TRANSFORMER                        OF THE RM                                                Rsarntic M<<san Centered Fbcr R        S      a 1-TR11B      0  ELECTRICAL DISTRSUT/600VAG                  609.00 4KV RM. 600V SWGR Area,  N THE NE REGN OF  609.00        1S x Baedeg Spscttum vs.                              YOS    Yos BUS 11B SUPPLY TRANSFORMER                          THE RM                                                  Reartstic Median Cantered Fbor Re 1.TR1'IC      0  ELECTRICAL DISTRIBUT I 600VAC      AVXIUARY  609.00 4KV RM, CO 4KV SWGR RM, IN THE NE REGN                    1.5 x Boundeg Spect/um vs.          Yes    Yes  Yes  Yos    Yes BUS 11C SUPPLY TRANSFORMER                          OF THE RM                                                ROSMc Median Centered Fbor Re        S 1.TR11D        0  ELECTRICAL DISTRIBUT/600VAC        AUXILIARY 609.00 4KV RM. 600V SWOR Area. IN THE NE REGN OF  633.00        1.5 x Boundeg    Spectrum vs.                                  Yes BVS 11D SUPPLY TRANSFORMER                          THE RM                                                  ROSMc Median      Centered Boor Res      S      a 131    16                    0  250VDC CONTROL AND I I BATTERY    AUXIUARY  633.00 HALLWAY,20 FEET N OF THE'N'RAIN                    Yss  1.5 x Boundeg    Speci/um vs.              Yes        Yes    Yes CHARGER                                            BATTERY RM NEAR THE E WALL                              ROOMc Median      Centered Roor 16 1+GABL          0 0
250V DG DISTRIBUTIONI PLANT BATT BATT~ BAlTERYCHARGER
                                  &#xb9;1 250V DC DISTRIBUTION/PLANT AUXIUARY AUXILIARY 613.00 613.00 BATTERY CHARGER &#xb9;14I    ~
4KV RM. N CENTER OF RM. 4 FT N OF PLANT 4KV RM, Mezzanee Area, IN CENTER OF THE N/A Rs 1.5 x Bountarg Reartsdc Median R
S Spectrum Centered S      a vs.
Fbor Yss    Yos  Yes  Yes    Yes 1.5 x Boundeg    Spectrum vs.      Yes    Yes  Yes  Yes    Yes BATTERY BATT~ CHARGER &#xb9;2                            RM, 4 FT S EASST OF PLANT BAlTERY                        ROOMc M<<san      Centered Fbor CONTROL PANEL &#xb9;14LG4dt                                          Response  S 16                    0  250VDC CONTROL AND I I BATTERY    AVXIUARY  633.00 HALLWAY,22 FEET N OF THE 'tr TRAIN                        1.5 x Boundeg    Spectrum vs.      Yes    Yss  Yss  Yes    Yes CHARGER                                            BATTERY RM, NEAR THE E WALL                              ReaMc Median      Centered Fbor Res        S      a 16                    0  250V Dc DISTRIBUTIONI PLANT        AUXIUARY  626.00 CD BAIT EQUIP AREA, N N END OF RM. 4 FT    633.00        1.5 x Boundeg Spectrum    vs.                    Yes  Yes 14IGCDL'4IC<02 BATTERY BATT~ CHARGER &#xb9;1                            SW OF PLANT BATTERY OLSTRIBUTION PANEL                  ROSMc Median Centered      Boor
                                                                                      &#xb9;14I GTCA:D                                                    Res        S      a
                                                                                                                                                      ~
0  250V DC DISTRIBUTION/PLANT        AUXILIARY 626.00 CD BATT EQUIP AREA, IN N END OF THE RM      633.00        1.5 x Boundeg Spectrum    vs.      Yes    Yes  Yes  Yes    Yes BATTERY BATT@0 CHARGER &#xb9;2                                                                                    ROOMc M<<fian Centered      Fbor R          S 137            1<RID4.        0  120VAG CONTROL ROOM I 120VAC                609.00 INVERTER AREA, IN THE MIDDLEE REGN OF                    1.5 x            Spectrum vs.              Yes  Yes INV          CONTROL ROOM NSTRVMENT                              THE RM, 20 FEET FROM THE N WALL,3 FEET                  ROSMc Median Centered      Fbor DISTRIBUTION SYSTEM CIW                            FROM THE E WALL                                                Response Spectra INVERTER 16    1<RID4t-        0  120VDGDISTRIBUTION/120VAC          AUXIUARY  609.00 NVERTER AREA, N SE REGN OF RM, 10 FT                      1$ x Baedeg Spsarum vs.            Yos    Yes        Yes NV            CONTROL ROOM INSTRUMENT                            FROM THE N WAU3FT FROM THE E WALL                      Reasstb Median Centered Fbcr DISTRIBUTION SYSTEM CHAI                                                                                            Response Spectra INVERTER 16    1  CRID4tl-    0  120V CONTROL ROOM IN I 120VAC      AUXILIARY 609.00 INVERTER AREA, N THE SW REGN OF THE        63300  N/A  1$ x Boundeg Spectrum vs.          Yos                        Yes NV            CONTROL ROOM NSTRUMENT                              RM.20FEETFROMTHESWAU 3FEETFROM                          ROSMc M<<&#xb9;sn Centered Roor DISTRIBUTION SYSTEM CH4II                          THE W WALL                                                      Response Spectra INVERTER Certification:
Allthe information contained on this Screening Verification Data Sheet (SVDS) Is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
I&/ f f (e5 Printer T pe Name                                    i  nature                      Date                    Print or T pe Name                                Si  at  e                Date
 
Walkdown:, ical Outages                                                                      DC C            .IT 1                                                                                ge 10of10 SCREENING VERIFICA ~A DATA SHEET (SVDS)
Rev                                              Fkor                Room or Ro/r/Coa/mn            Base                  Capacity va.            Cap >  Caveats Ancnor        Equp Item    Eq. Ci  Equip.to No. Ho                                              Eiev.                                              Elev.                Demand Basta            Demand?  OK?    OK?          OK?
140      16  14RID4V-  0  120V CONTROL ROOM IN /120VAC                      CONTROL RM, IN 1HE NE CORNER OF TH RM.                      1.5 x Boundrtg Spectrum va                                      Yea utv        CONTROL ROOM INSTRuMENT                            ON THE E WAUONCONTROL RM E REAR                          Rsattsdc Median Centered Floor DISTRIBuTION SYSTEM CH4V                            INSTRUMENT/RElAYRACK        &#xb9;1~                                  Response Spectra INVERTER 141      16    14?GAB-  0  DIESEL GENERATOR, CO/AB                            AB EDG RM, IN NE REGN OF THE RM, 20 FEET    587.00  N/A    1.5 x Boundeg Spectrum  va.      Yea INV        EMERGENCY DIESEL GENERATOR                        NE OF AB EMERGENCY DIESEL GENERATOR                        Reasadc Msrsan Centered  Ficor OME-1 5MB 6/VERTER                                  &#xb9; I 4?ME-1 SOAB                                                  Response Spectra CD EDG RM, IN THE MIDDLES REGN OF THE      587.00  N/A    1.5 x Boundvtg Spectrum va.      Ysa      Yes    Yes            Yea 142      16              0  / DIESEL GENERATOR INVERTER    AUXIUARY RM, 15 FEET SW OF THE CD EMERGENCY                        Rsarnuc Mix%an Centered  Ficor
                                                                                                      &#xb9;I DIESEL GENERATOR %ME-15OCD, NEAR                                  Response Spectra THE FLR Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" lndudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
Printor T pe Name                            Si nature                          Date                    Print or    pe Name                                Si  at  e                  Date
 
Walkdown:            .. of 10/18/93                                                            DC CO        .IIT 1                                                                            roage1 of1 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl    Equp.lo    Rev      system/Equipment Descnpoon                Floor            Room or Rawrootumn                Base                                          Ceveets              KqtSp Na        No                                                Elev.                                              Elev.                                          OK7    OK7            OK7 I+T-tce-    0  DIESEL FUEL Oil. I AB KhfERGKNCY  AUXILIARY S87 00 AB KDG FUEL OILTRANSFER PUhiP Rht, IN THE    587.00  Ya  Boundstg Spectrum vs. SSE  Ya      Ya    Ya            Ya ABI            DIESEL FUEL OILTRANSFER PUMP                        hQDDLE sE REGN 0F THE RhL 20Fr s 0F THE                  Ground Response Spectnsn SI                                                  RhfS ENTRANCE DOOR, hVAR THE E WALL,ON THE FLR I+I-toe. 0  DIESEL FUEL OILI AB KhtKRGKNCY              587.00 AB KDG FUEL OILTRANSFER PuhtP RhL IN THE    587.00      Boundeg Spectrum vs. SSE    Ycs            Ya AB2            DIESEL FUEL OIL TRANSFER PUMP                      hiIDDLESE REGN OF THE RhL 22FT S OF THE                  Ground Response Spectrum ll2                                                Rhrs ENTRANCE DOOR, hVARTHE E WAU hEAR THE FLIL Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Is  zs/5 Print or T pe Name                                  Si nature                      Date                      Print or T pe Name                          n    re                  Date
 
N9 0 I 0
 
Walkdown:          K of  10/04/93                                                          D.C..nit        1                                                                                Page  1  of 3 SCREENING VERIFICATION DATA SHEET (SVDS)
Rev                                                                                                    Base Elev.                          Cap > Caveats                    Eqvp ko                                                                                                                                          Oemd?  OK?    OK?              OK?
1+P  10E      0  CGW I EAST CCW PUMP                            AUXILIARY        609.00 HALLWAY                              NIA    1.5 x Boundeg      Yes    Yes    Yes                Yes Spectrum vs.
Rearistic Median Cantered Boor Res              s 1+P-IOW        0  CCWI WEST CCW PUMP                                              609.00 HAllWAY,                              Yas  Baacbng Spectrum      Yas    Yss                      Yes vs. SSE Ground
 
===Response===
S 1+P-26N        0  SAFETY INJECTION/NORTH SAFETY INJEGTIONPUMP    AVXILIARY              N SAFHY INJECTION PUMP                Yes  Boundeg Spectrum      Yas    Yes    YO$                Yes RM, N THE MIDDLEOF THE                      vs. SSE Ground RM, 5 SE OF THE ENTRANCE                        Response DOOR.                                            S 14'P-269        0                  I SAFETY NJ ECTION SOUTH SAFETY INJECTION PUMP    AUXIUARY                S SAFETY INJECTION PUMP                      1.5 x Baedeg      Yes          Yes                Yas RM, IN THE CENTER OF THE                      Spectrum vs.
RM, 5'E OF THE RM'S                          Resssuc Marian ENTRANCE.                                    Cantered Fhor Re W'P4E          0  AUX FEEDWATERIEASTMOTORDRIVAUXFEEDWATER          TURBINE        591.00 E MOTOR DRIV AVXFDWIR      591.00    Yes  Boundeg Spectrum                    Yas                Yes PUMP                                                                    PUMP RM. N THE MtDDLE OF                    vs. SSE Ground THE S PART OF THE RLL                            Response S
I+PE            0  AVXFEEDWATERIWEST MOTORDRIVEN AUX                TURBINE        591.00 W MOTOR DRIV AUX FDWTR      591.00    Yes  Boundeg Spectrum      Yes          Yas                Yas FEEDWATER PUMP                                                          PUMP RM. N THE MIDDlEOF                      vs. SSE Grand THE W PART OF THE RM, O'                        Response OF THE ROLL4lp DOOR                              Spec@un ENTRANCE I+P<          0  AUXFEEDWATERITURBINEDRIVAVXFEEDWATER            TURBINE        591.00 TURB ORIV AUX FDWTR        591.00            1.5 x Boundeg      Yes          Yes      Yes      Yes PUMP                                                                    PUMP RM, SE PART OF TRE                        Spactnsn vs.
Reatisdc Marian Centered Fker Re        S 1+FBI          0  GVCSI BORIC ACID STORAGE TANKS TRANSFER PUMP                            BORIC ACID STORAGE TANK                      1.5 x Boundeg      Yes            No 1                                                                      AREA, IN MIDDLEE REGN OF                      Spectrum vs.
RM, S E OF MIDDLEBORIC                      Raaristic MaSsa ACID STORAGE TANK 12-TK-                      Cantered Boor 12M. NEAR FLIL                              Re 1+P~2          0  GVCS I BORIC ACID STORAGE TANKS TRANSFER PUMP  AUXILIARY              BORIC ACID STORAGE TANK              NIA    1.5 x Boundng      Yas    Yas            Yas      Yas 2                                                                      AREA, N MIDOLE kE REGN                        Spectrum vs.
OF RM. S kE OF MIDDLE                        Reslstic Median BORIC ACID STORAGE TANK                      Centered Boor 12 TK-12M. kEAR FLIL                        Rosrxesa S 10              1+P<9          0  GVGS I RECIPROCATNG CHARGING PUMP              AUXII.IARY      587.00 RECIPROCATNG CHARGNG                          1.5 x Boundeg      Yas    Yos    Yes PUMP RM, N THE CENTER OF                      Spectrum vs.
THE N END OF THE RM, FlR                    Realsuc Marian MOUNTED, S ABOVE THE FLR                      Centered Boor Re Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
l~ I/      fg                                                                                        (Z./((As Print or T pe Name                              Signature                      Dae                    Print or T pe Name                              Si nature                    Date
 
l 0
 
Walkdown:            of 10/04/93                                                            D.C. C        .Iit1                                                                                .3age 2 of 3 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq.      Equy. IO                      System/Equpmant Descnpton              Buadeg                                                                                Csp >      Anchor              EquSt CI                                                                                                                                                                  Demd?        OK?                OK7 I+P40E        0  CVCS I EAST CENTIUFUGALCHARGING PUMP              AUXILIARY                E CENTRIFUGAL CHARGING                    1.5 x BourxSng      Yes  Yes                        Yes PUMP RM, IN THE CENTER OF                  Spectrum vs.
THE RM, FLR MOUNTED,                      Reassttc Median THE FLR        5'BOVE Cantered Boor R                4 12            I+P40W        0  CVCS I WEST CENTRIFUGAL CHARGING PUMP              AUXILIARY                W CENTRIFUGAL CHARGING              NIA  1.5 x Boundeg      Yos          Yos                Yes PUMP RM, IN CENTER OF THE                  Spectrum va RM, 5'BOVE FLR                            Rearrsdc Median Centered Floor Re        S 13              14'PMN        0  CONTROL ROOM A/C CHI I CONTROL ROOM NORTH          AUXILIARY                CONTROL RM, Alc RM. O'                    1.5 x Boundeg      Yos          Yes                Y44 CHILLWATER CIRCULATIONPUMP                                                  OF CR A/C N UQUID CHILLER.                  Spectrum va NEAR THE FLIL                            Reassdc MtxSsn Centered Boor Re        S      a 14'PMS        0  CONTROL ROOM A/C CHI I CONTROL A/C SOUTH CHILL    AUXILIARY                CONTROL RM, Ac RM. O'                N/A  1h x Boundeg        Yas          Yos                Yas WATER CIRCULATION PUMP                                                      OF C/R A/C S UQUID                          Spectnsn vs.
CHILLER NEAR THE FUL                      ROSSSSc MatSsn Centered Boor Res      eS      4 15              124'P-10      0  COW I SPARE CCW PUMP                              AUXIUARY                  HALLWAY,                                  1.5x~
Spectrum vs.
Yos          Yes                Y4$
ROSSSSc  MaLe Centered Fioor Re          S    a 12-PAIN        0  SPENT FUEL PIT COOLII NORTH SPENT FUEL PIT PUMP                              SPENT FUEL PIT HEAT                        1.5 x Boundeg      Yes                              No XCHGR RM, IN THE NW                          Spectrum va REGION OF RM, 5 FT NORTH                  ROSSSSc Median OF NORTH SPENT FUEL PIT                    Centered Fkxx HEAT EXCHANGER &#xb9;12+IE-                  Response Spectra 16N. NEAR THE FLR 17              I +P~E        0  RHR I EAST RHR PUMP                                AVXIUARY        573.00    E RHR PUMP RM, 10 FEET N            NIA    1.5 x Boundeg                  Yes                Yes, OF THE E RHR PUMP                            Spectrum vs.
DOORWAY,                                  Resrrsdc Median Cantered Roar Res        S    4 18              1+P~W        0  RKR I WEST RHR PUMP                                AVXILIARY      573.00    W RHR PUMP RM, MIDDLEOF              NIA    1.5 x Boundeg      Yas Yas    Yes      Yas N PART OF RM,                              Spectnsn vs.
Rasrr'c MaSan Centered Boor R          Spectra I+P-7E        0 ESW I EAST ESW PUMP                              SCREEN HOUSE      531.00    E ESW PUMP RM,              591.00        1.5 x Boundeg      Y44        Yes                Yas Spectrum vs.
Resrndc MatSsn Centered Fker Response S        4 I+P-?W        0  ESWI WEST ESW PUMP                              SCREEN HOUSE      591.00    W ESW PUMP RM,              SS1.00 NIA    14 x Boundeg        Yes Spectrum vs.
Res%ado Median Centered Boor Response S Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SR%) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
(zl(/ m Print or Type Name                                Si nature                      Date                      Print or Type Name                          Signature                    Date
 
Waikdown:          x of t0/04/93                                                          D.C. C        .Iit 1                                                                                'age3of3 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq.      Equip. IO    Rev                                                                Fkxx Elev      Room of Row/Cotufnn  Base Eiev.                          Cap >        Anchor          EIFNI 0ernd7          OK7            OK7 CI                      No E CONT SPRAY PUMP RM. IN                  1.5x Boundna        Yes          Yes        Yes  Yes 21    6        14'P-9E      0  CONTAINMENTSPRAY I EAST CONTAINMENTSPRAY        AUXIUARY PUMP                                                                      THENWREGN.,                                Spectnsn vs.
Rea1suc Median Centered Ftoor Response S      a CONTAINMENTSPRAY I WEST CONTANMENT SPRAY        AUXII.IARY      573.00    W CONT SPRAY PUMP RM. IN                  1.5 x Boundsta      Yes 1+P-9W        0 PUMP                                                                      THE NW REGN OF 'THE RM.,                    Spectrum vs.
Rearrstic Median Centered Fkxx Re        S Certification:
Allthe information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
entries Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the and conclusions. One signatory should be a licensed professional engineer.)
                                                                                                                                                                                              >z(//As Print or T pe Name                            Signature                      Dat                        Print or Type Name                          Signature                      Date
 
lK) 4~  h
 
Walkdown            . of 11/8/93                                                            DC          JNIT 1                                                                                      Page1of5 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. CI  Egu'4I.ID  Rev                                                            Room or Row/Cohmn                    esse                Copocrty vs.          Cop >  Covests                Ertusr No.      No                                                                                                  Elev.              Demand assis          Dem end?  OK?                    OK?
7    W)RYAN?      0  STEAM LNE DRAINS I MAINSTEAM  AUXILIARY 621.00  W MAN STEAM STOP ENCCLOSURE. 4'W OF                          Boundrng Spedrum vs. SSE              Yes            No LEADS CONDENSATION DRAIN                        SG STOP VALVE&#xb9;14IRV-230, NEAR THE FLR                        Grasxl Response Spectrum TANKTK-200, OURET SHUTOFF VALVE 7    I+RV-245      0  AUX F EEDWATER I WEST MOTOR    TURBWE  591.00  W MOTOR DRIVAVXFDWTR PUMP RM, ON                              Bouxbng Spodnsn vs. SSE                Yos DRIVAUXFEEDWATER PUMP PP                        THE MIDDLEOF THE E WALLO' OF W                                Ground Response Spectrum 3W2 AIROPERATEDTESTVALVE                        MDAFWPP. 3'BOVE FLR 7    I+Rv-247      0  AUX FEEDWATER I WEST MOTOR      TURBINE  591.00  W MOTOR DRIVAUX FDWTR PUMP RM, N THE                          Bandeg Specuum vs. ssE        Yes      Yes            Yes DRIVAUX FEEDWATER PUMP PP-                      SE PART OF THE RM, 10'E OF W MDAFWPP,                        Ground Response Spectrum 3W EMERG 1 AIR OPERATED                          2'BOVE THE FLR LEAKOFF VALVE 7    I+RV-255      0  AUXFEEDWATER I EAST MOTOR      TURBINE  591.00  E MOTOR DRIV AUX FDWTR PUMP RM, N THE                        Bourx&#xb9;ng Spedrum vs. SSE                              Yes    Yes DRIVAVXFEEDWATER PUMP PP-                        NW PART OF THE RM, NEAR THE W  WAUT'WOF Ground Response Spectrum 3E 2 AIR OPERATED TEST VALVE                          E MDAFWPP MTR 2'ABOVE THE FLR 7    I+RV-256    ~
0  AUXF EEDWATER I TURB NE DRIV            591.00  TURB DRIV AUX FDWIR PUMP RM, N THE NW                      ~ Bounding Specuum vs. SSE      Yes              NIA            Yes AVXFEED PUMP PP4 2 AIR                          PART OF THE RM, 7'W OF AUX FEED PUMP                          Ground Response Spectmrn OPERATED TEST VALVE                              TURBNE 14?ME49. O'ABOVE THE FlR 7    1+RV-257      0  AUX FEEDWATERI EAST MOTOR      TURBINE  SS1.00  E MOTOR DRIVAUX FDWTR PUMP RM, IN THE          633.00  Yes    Bourxung Spectrum vs. SSE    Yes      Yos            Yes    Yes DRIVAUXFEEDWATER PUMP PP-                        NW PART OF THE RM, ON THE W WAll 6'W                          Ground Response Spectrum 3E EMERG 1 AIR OPERATED                          OF E MDAFWPP, 6'BOVE THE FLR.
LEAKOFF VALVE 7    I +RV-256    0  AVXFEEDWATER I TURBWE DRIV      TURBINE  SS1.00  TURB DRIVAUXFDWTR PUMP RM, N THE NW                          Boundsrg Spectnsn vs. SSE    Yes                    Yes AVXFEED PUMP EMERG 1 AIR                        PART OF THE RM, 6'W  OF AFW PP TURBINE                        Ground Response Spectrum OPERATED LEAKOFF VALVE                          14?MES. 6'BOVE THE FLR 7    14IRV-221    0  MAIN STEAM I STEAM GENERATOR            633.00  W MAINSTEAM STOP ENCLOSURE, 5' OF              633.00  Yes  Bounding Spednsn vs. SSE      Yos      Yes    NIA    Yes    Yos 2 STOP VALVEMRV-220 STEAM                        STEAM STOP VALVE14IRV-220, BY THE 640                        Ground Response Spectrum CYLINDER'A'UMP VAlVE                            EL PlATFORM.
7    14IRV.222    0  MAINSTEAM I STEAM GENERATOR    AUXILIARY 633.00  W MAIN STEAM STOP ENct.0 SURE, 3'E      OF                  Bourxrng Spectnrm vs. SSE    Yos      Yes            Yes    Yes 2 STOP VALVEMRV-220 STEAM                        STEAM STOP VALVE14IRV-220, ON THE 640                        Ground Response Spectrum CYUNDER '17 DUMP VALVE                          EL PLATFORM.
10      7    14IRV-223    0  MAINSTEAM I STEAM GENERATOR    AUXILIARY 633.00  W MAINSTEAM STOP ENCLOSURE,    7'E      OF    633.00  Yes  Boundrng Spectrum vs. SSE    Yes      Yes OME4-2 PORV                                      THE TOP OF STEAM STOP VALVE14IRV420,                          Ground Response Spectrum ON THE 647 EL PIATFORM.
7    14lRV.231    0  MAIN STEAM I STEAM GENERATOR  AUXILIARY 633.00  W MAINSTEAM STOP ENCLOSURE. 5' OF                            Boundrng Spectrum vs. SSE    Yes                    Yes 3 STOP VALVEMRV-230 STEAM                        STEAM STOP VALVE14IRV-230, ON 640 EL                          Ground Response Spedrum CYLINDER 'A'UMP VALVE                            PLATFORM.
12      7    14IRV-232      0 MAINSTEAM I STEAM GENERATOR    AUXILIARY 633.00  WMAINSTEAM STOP ENCLOSURE, 3'WOF                              Boundsrg Spectrum vs. SSE              Yos N/A    Yes 3 STOP VALVEMRV-230 STEAM                        STEAM STOP VALVE14IRV-230, OM THE 640                        Ground Response Spectrum CYLNDER 'B'UMP VALVE                            EL ptATFDRIrL 13      7    14IRV-233      0 MAN STEAM I STEAM GENERATOR    AUXILIARY 633.00  W MAIMSTEAM STOP ENCLOSURE,    6'E      OF                  Bourxbng Specuum vs. SSE      Yes                    Yes OME44 PORV                                      THE TOP OF STEAM STOP VALVE14IRV-230,                        Ground Response Spectrum ON THE 647 EL PLATFORM.
14      7    14V-140-1      0 AVXFEEDWATERITURBWEORIV        TURBINE  591.00  TBDRIVENAUXFDWrRPMP                            633.00  Yes  Bound+9 Spectrum vs. SSE      Yes      Yes    NIA    Yes    Yos.
AUXFEED PUMP GOVERNOR OIL                                                                                      Ground Response Spectrum COOLER COOUNG WATER INLET SAF ElY VALVE 15      7    14V-140.2      0 AUXFEEDWATERI TURBWE DRIV      TURBINE  591.00 TB DRIVEN AVXFDWlR PMP                          633.00  Yes  soundly Spectrum vs. SSE      Yes                    Yes    Yos AUXFEED PUMP OIL COOLER                                                                                        Ground Response Spednsn COOLWG WATER INLET SAFETY VALVE Certification All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers o the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed profes ion I engineer.)
r                              p/a          4j-                                                                                      /2  l Print or Type Name                            i    ature                      Date                          Print or T pe Name                            Si nature                    Date
 
bl 'lg I
 
Walkdown..K of 11/8/g3                                                                      DC          . tjNIT 1                                                                                Page2of5 SCREENING VERIFICATION DATA SHEET (SVDS)
Ecssp.to Rev                                              Fker              Rooni of Ravtcofumn                                                            Csp >                        Equ<<r No. No                                              Elev.                                                                                          DemsncP      OK7            OK7 18      7    14V-169E    0  AUX FEEDWATER I EAST MOTOR        TURBNE    591.00  E MOTOR DRIVEN AUX FDWTR PU              633.00  Yes      Boundng Spectrum vs. SSE                                      Yes DRIVAUXFEED PUMP PP4E                                                                                        Ground Response Speaiurn SUCTION SAFETY VALVE 17      7  14V-169W    0  AUX FEEDWATER I WEST MOTOR        TURBNE    591.00  W MOTOR DRIVEN AVXFDWTR PU                                Bandng Spectrum vs. SSE          Yes                          Yes DRIVAUX FEEDWATER PUMP                                                                                        Ground Response Speaium SUCTION SAFETY VALVE 18      7    14V-1A-2  0  MAINSTEAM I STEAM GENERATOR      AUXILIARY  633.00  WMAINSTMSTOP ENCL                        633.00  Yes    Boundng Spectnsn vs. SSE                            Yes OME4.2 SAF HYVALVE1A                                                                                          Ground Re        S 19      7    14V-1A4    0  MAINSTEAM I STEAM GENERATOR      AUXILIARY  633.00  W MAIN STM STOP ENCL                    633.00  Yes    Boundng Speansn vs. SSE          Yes                Yes      Yos OME44 SAFETY VALVE1A                                                                                          Ground Rs        Spectrum 7    14V-1 8-2  0  MAINSTEAM I STEAM GENERATOR      AUXIUARY  633.00  WMAINSTMSTOPENCL                        633.00  Yes .. Boundng Spearum vs. SSE                Yss          Yes      Yes 2 SAFETY VALVE18                                                                                              Grand Ros        eS 21      7    14V 184    0  MAINSTEAM I STEAM GENERATOR      AUXIUARY  633.00  WMAINSTMSTOPENCL                          633.00  Yes    Boundng Spectrum vs. SSE OME44 SAFElY VALVE18                                                                                          Ground R          S 7    14V.2A-2    0  MAINSTEAM I STEAM GENERATOR      AUXILIARY  633.00  WMAINSTMSTOP ENCL                        633.00  Yes    Boundng Spedrum vs. SSE          Yes OME4-2 SAFETY VALVE1A                                                                                        Ground Rescenss S 7    14V-2A4    0  MAN STEAM I STEAM GENERATOR      AUXIUARY  633.00  WMAINSTMSTOP ENCL                        633.00  Yes    Boundng Spectrum vs, SSE        Yss                          Yos OME44 SAFElY VALVE2A                                                                                          Ground Re        eS 24      7    14V-28-2    0  MAINSTEAM I STEAM GENERATOR      AUXILIARY  633.00  W MAINSTM STOP ENCL                      633.00  Yes    Boundng Speansn vs. SSE          Yes OME4-2 SAF HYVALVE28                                                                                          Ground R          S 25    7    14V-284    0  MAINSTEAM I STEAM GENERATOR      AUXILIARY  633.00  WMAINSTMSTOP ENCL                        633.00  Yes    Boundng Spearum vs. SSE          Yes  Yes                    Yes OME44 SAF HYVALVE28                                                                                          Grand R          Spedrum 7      14V4-2    0  MAINSTEAM I STEAM GENERATOR      AUXILIARY  633.00  WMAINSTMSTOP ENCL                        633.00  Yes    Boundng Spectrum vs. SSE        Yes  Yes            Yes    Yes OME4.2 SAFElY VALVE3                                                                                          Grand R          S 27    7      14V44      0  MAINSTEAM I STEAM GENERATOR                633.00  W MAINSTM STOP ENCL '10 FT NW OF STEAM    633.00  Yes      Bandng Spsansn vs. SSE      Yes OME44 SAFHY VALVE<<3                                STOP VLV<<WARY-230, ON 640 ELEVATION                      Ground Response Spectrum PLATFORM 28      7    14V47-1    0  COW I CCW TO BORIC ACID          AUI0UARY  587.00  REFVELNG WTR PURIF PMP RM                567.00  Yes      Boundng Spedrum vs. SSE        Yes  Yss            Yos    Yes SAFHY VALVE                                                                                                  Ground R          S 7    1  WRY 711  0  ESW I ESW TO CONTROL ROOM        AUXIUARY  650.00  CTRL RM AIR COND RM                                      1$ x Bandng Speaium vs.                                      Yos NC NORTH UOUID CHILLER                                                                                      Rosssdc Masan Centered Boor CONDENSER CONTROL VALVE                                                                                            Response S      s 7    1-WRV-712    0  ESW I ESW TO CONTROL ROOM        AUXIUARY  65IL00  CTRL RM AIR COND RM                      650.00  N/A    1.5x Bandng Spectnsn vs.        Yos                          Yes AIC SOUTH UQVID CHILLER                                                                                      Rssrrsdc Median Centered Fker CONDENSER CONTROL VALVE                                                                                            Res      S 31    7    1-WRV-761    0  ESWI EAST ESW PUMP PP-7E      SCREENHOUSE  59$ .00 EESWPUMPRM,                                                Boundng Specaum vs. SSE                              Yes    Yes DISCHARGE STRANER EAST                                                                                        Ground Response Spectrum BASKET BACKWASH OUTLET SHUTOFF VALVE 7  1-WRV-762    0  ESWIWESTESWPUMPPP 7W          SCREENHOVSE  591.00  W ESW PUMP RM, Z S OF W ESW PUMP          633.00  Yes      Boundng Spearum vs. SSE        Yos  Yos                    Yes DISCHARGE STRAINER EAST                            DISCHARGE STRAINER <<I OME44W, 1'BOVE                      Ground Response Spectrum BASKET BACKWASH OUTLET                              THE FUL SHUTOFF VAVLE 7  1-WRV-766    0  ESW I EAST ESW PUMP PP-TE    SCREENHOUSE  591.00  EESWPUMPRM,                              633.00  Yss      Bandng Spearum vs. SSE          Yes  Yes            Yos DISCHARGE STRAINER EAST                                                                                        Grand Response Spectrum BASKET BACKWASH4 AIR OPERATED NLET SHtPOFF VALVE 7  1-WRV-767    0  ESWI WEST ESW PUMP PP 7W      SCREENHOUSE  591.00  W ESW PUMP RM,                            633.00  Yes      BourxLng Speamm vs; SSE        Yes DISCHARGE STRAINER EAST                                                                                        Ground Response Spectrum BASKET BACKWASH INLET 4 AIR OPERATED SHUTOFF VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed prof ssional engineer.)
                                                                                    /I'/l3      4 Printor T pe Name                              i  ature                          ate                  Print or Type Name                                Si nature                  Date
 
0 I
ii
 
Walkdown..K of 11/N93                                                                        DC C        JNIT1                                                                                            Page3of5 SCREENING VERIFICATION DATA SHEET (SVDS) aem    Eq. Cl  Equip.lo  Rev    System/Equ'pment eescnphcn              Fher                                                                                Capaaty vs.            Cap >  Caveats    Interaa  Eqtsp No. No                                              Bev.                                                                                Demand Basis          Demand7  OK7        OK?      OK?
35      7    1-WRV-771      ESW I EAST ESW PUMP PP-7 E    SCREENHOUSE 591.00  E ESW PUMP RM,                                                        Boundng  S pecuum  vs. SSE    Yos    Yos        Yes      Yes DISCHARGE STRANER WEST                                                                                                    Glotnd Response Spechum BASKET BACKWASH OUTLET SHUTOFF VALVE 36      7    1.WRV-772    0  ESWI WEST ESW PUMP PP-7W      SCREENHOUSE 591.00  W ESW PUMP RM,                                                        Bouaurg Specuurn vs. SSE                          Yes DISCHARGE STRANER WEST                                                                                                    Ground Response Spectnm BASKET BACKWASH SHUTOFF VALVE 37      7    1-WRV.?76    0  ESW I EAST ESW PUMP PP-?E      SCREENHOUSE 591.00  E ESW PUMP RM.                                                Yes    Bounding Spectrum vs. SSE              Yes DISCHARGE STRANER WEST                                                                                                    Ground Response Spectrum BASKET BACKWASH NLET 4 AIR OPERATED SHUTOFF VALVE 38      7    1-WRV-777      ESW I WEST ESW PUMP PP-7W      SCREENHOUSE 591.00  W ESW PUMP RM,                                                        Bourxhng Spectrum vs. SSE              Yes        Yos      Yes DISCHARGE STRAINER WEST                                                                                                  'Ground Response Spectrum BASKET BACKWASH INLET4 AIR OPERATED SHUTOFF VALVE 39      7    124'RV<1    0  CONDENSATE STORAGE SIUNIT1        TURBINE  591.00  AUX FEED PUMP E HALLWAY. 5'E          OF THE                          Boundirg Spechum vs. SSE      Yes                Yes AND 2 CONDENSATE STORAGE                          TURBINE DRIVEN AFW PUMP RM,  2'W          OF                          Ground Response Spectnsn TANKCROSSTIE 8 AIR OPERATED                        COLUMN  SH-13,4'ABOVE  THE FLR SHUTOFF VALVE 40      7    12~-217    0  REACTOR NITROGEN I REACTOR      GROUNDS  609.00  REACTOR GAS BOTTLE STORAGE AREA, 45                            Yes    Bourxhng Spectnm vs. SSE              Yes  NIA  Yes      Yos PLANT NITROGEN BULKSTORAGE                        FEET NORTHWEST OF THE AUX609                                          Ground Response Spectnsn TANKS SAF ETY VALVE                                CRANEBAYROLLUP DOOR, BETWEEN REACTOR NITROGEN STORAGE TANKS rr12-TK-2074 AND 41      8    1-NO-210    0  CONTANMENT SPRAY/EAST            AUXIUARY  573.00  E CONT SPRAY PUMP RM, IN THE SW REGN                                  Bourxhng Spectrum vs. SSE      Yes    Yes                  Yes COMTANMENTSPRAY PUMP PP4E                          OF RM, T SW OF E CONT. SPRAY PUMP,                                    Ground Respor>>e S pectnm DISCHARGE SHUTOFF 10 MOTOR                                FLR,                                4'BOVE OPERATED VALVE 42      8    1-IMO-211  0  CONTANMENTSPRAY I EAST          AUXILIARY 573.00  E CONT SPRAY PUMP RM, IN THE SWREGN                                    Boundrng Spectnm vs. SSE      Yos    Yos                  Yes CONTANMENTSPRAY PUMP PP-9E                        OF RM, T SWOF E CONT. SPRAY  PUMP,4'BOVE Ground Response Spectnm DISCHARGE SHUTOFF 10 MOTOR                                FLR, OPERATED VALVE 43      8    1 4MO-212  0  CONTAINMENTSPRAY I EAST          AUXIUARY  573.00  E CONT SPRAY PUMP RM, IN THE MIDDLE S                                  Bouncbrg Spectrum vs. SSE                          Yes      Yes CONTAINMENTSPRAY PUMP PP-9E                        PART OF RM, 3'W  OF E CONT. SPRAY PUMP,                              Ground Response Spocuum DISCHARGE TOCONTANMEMT                            3'BOVE THE FLR.
SPRAY ADDITIVEEDUCTOR 2 MOTOR OPERATED SHUTOFF VALVE 44      8    1-NO-215    0  CONTAINMENTSPRAY I RWST To      AUXILIARY 573.00  E CONT SPRAY PUMP RM, IN THE NE PART OF                        Yos    Bourxhng Spearum vs. SSE      Yes    Yes EAST CONTANMENTSPRAY PUhlP                        THE RM, 8' OF E CONT. SPRAY PUMP, ON Ground Rasper>>e Spectrum PP4E SUCTION 12 MOTOR                              THE 577 EL PLATFORM..
OPERATED SHUTOFF VALVE 45      8    '14MO.220      CONTANMENTSPRAY I WEST                      573.00 W CONT SPRAY PUMP RM. N THE S PART OF                                  Boundng Spectrum vs. SSE      Yes    Yos                  Yos CONTANMENTSPRAY PUMP PP-                          RIJL 5'E OF W CONT. SPRAY PUMP, 4'ABOVE                                Ground Respcnse Spectrum 9W DISCHARGE SHUTOFF 10                            FLR, MOTOR OPERATED VALVE 46      8      1-IM0.221  0  CONTIANMENTSPRAY I WEST          AutuLIARY  573.00 W CONT SPRAY PUMP Rhl, N THE S PART OF                                Bourxhng Spearum vs. SSE      Yes    Yes        YO$
CONTANMEMTSPRAY PUMP PP-                          RM, 6 SE OF W SPRAY PUMP, 4'ABOVE FLR,                                Ground Response Speanm 9W DISCHARGE SHUTOFF 10 MOTOR OPERATED VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professio al engineer.)
                                                                                            /Lfi7 cf Print or T pe Name                            Signatu e                        Date                                Print or T pe Name                              Signature                  Date
 
Walkdown:            of 11/8/93                                                              DC C          NIT 1                                                                                Page4of5 SCREENING VERtFICAT ON DATA SHEET (SVDS)
Eq. Cl  Equsr.to  Rev                                              Fkxc              Room or Rowtco4mn                                    Capacay vs.            Cap >  Caveats AnctNf        Equip No.      No                                              Eiov.                                                                  Demand Basis          Demand7  OK7    OK7          OK7 47      8    14NIO-222    0  CONTAINMENTSPRAY I WEST          AUXIUARY  573.00  W CONT SPRAY PUMP RM. IN THE MIDDLENE                    Boundatg Spectrum vs. SSE                            Yos CONTABIMENTSPRAY PUMP PP-                          PART OF THE RM. 4' OF W CONT. SPRAY                      Ground Response Spectrum BW DISCHARGE  TO CONTIANMENT                        PUMP, 4'ABOVE FLR.
SPRAY ADDmvE EDUCTOR SHUTOFF 2 MOTOR OPERATED VALVE 8    14NIO-225    0  CONTAINMENTSPRAY I RWST TO      AUXIUARY  573.00  W CONT SPRAY PUMP RNL IN THE NW                          BoundsXI Spocinan vs. SSE WEST CONTAINMENTSPRAY PUMP                          CORNER OF RM, 8'  OF W CONT. SPRAY                      Ground Response Spectrum PP47W SUCTION 12 MOTOR                              PUMP, ON THE 577 EL PLATFORLL, OPERATED SHUTOFF VALVE 49      8    14M0010      0  RHR I EAST RHR PUMP PP45E        AUXILIARY  573.00  E RHR PUMP RM. IN THE NW CORNER OF THE    633.00  Yos  Boundatg Spectrum vs. SSE      Yes    Yes    NIA    Yos    Yes SUCTION SHUTOFF 14 MOTOR                            RM, 14' OF E RHR PUMP, 7 ABOVE 577 EL                    Ground Response Spectnan OPERATED VALVE                                      PLATFORM..
8    1-IMIM20    0  RHR I WEST RHR PUMP PP45W        AUXILIARY  573.00  WRHR PUMP RM, IN THE NE PART OF THE RM,    633.00  Yes  Bourx4ng Spectrum vs. SSE      Yos    Yos          Yes SUCTION SHUTOFF 14 MOTOR                            NEAR THE MIDDLEOF THE N WALI ON THE                      Ground Response Spectnan OPERATED VALVE                                      577 EL PLATFORLL.
51      8    1410M-221    0  MAIN STEAM I MtuN STEAM LEAD 2    AUXIUARY  633.00  W MAINSTEAM STOP ENCCLOSURE,    5'E  OF            Yes  Bounctrng Spec@urn vs. SSE      Yes    YO$          Yes    Yes TO AVXFEED PUMP TVRBINE 4                          STEAM STOP VLV&#xb9;14IRV~, ON 640 EL                        Ground Response Spectrum MOTOR OPERATED SHUTOFF                              PLATFORM.
VALVE 6    14ICM-231    0  MAINSTEAM I MAINSTEAM LEAD 3                        W MAINSTEAM STOP ENCCLOSURE. 4'E OF                      Bounctatg Spectrum vs. SSE              YS$. li/A  Yes To AVXFEED PUMP TURBINE 4                          STEAM STOP VALVE14IRV-230. ON 640 EL                    Ground Response Spectrum MOTOR OPERATED SHUTOFF                              PLATFORM.
VALVE 8    141M O-220    0  MAINSTEAM I STEAM STOP VALVE      AUXILIARY 633.00  W MAIN STEAM STOP ENCLOSURE, 3' OF                      Boundrng Spectrum vs. SSE      Yos    Yos
                                                                                                                                            ~
MRV-220 STEAM CYUNDER DUMP 4                        STEAM STOP VALVE14IRV-220, ON 640 EL                    Ground Response Spectrum MOTOR OPERATED VALVES                              PLA7FORM.
SELECTOR VALVE 8    14IMO-230    0  MAIN STEAM I STEAM STOP VALVE    AUXIUARY  633.00  W MAIN STEAM STOP ENCLOSURE,    3'W  OF            Yes            Spectnan vs. SSE      Yos    Yos            No MRV-230 STEAM CYLINDER DUMP                        STEAM STOP VALVE 14IRV-230, ON 640 EL                    Ground Response Spectrum VALVES4 MOTOR OPERATED                              PLATFORM.
SELECTOR VALVE 8    147 T406    0  MAINSTEAM I TURBINE DRIV AUX      TURBINE  591.00  TURB DRIV AVXFDWTR PUMP RM, 3'WOF          591,00        Boundatg Spectnan vs. SSE      Yes    Yes          Yos    Yes FEED PUMP PPP TRIP AND                              TDAFWP &#xb9;147ME49, 6'BOVE THE FLR                          Ground Response Spoctnan THROTTLE VALVE 1-WMO-      0  ESWI EAST ESW PUMP PP-7E      SCREENHOUSE  591.00  E ESW PUMP RM,                            591.00        Boundatg 8 pocrrum vs. SSE      Yes    Yes                  Yes 701          DISCHARGE SHUTOFF VALVE                                                                                      Ground Response S 57            1 WMO          ESW I WEST ESW PUMP PP.7W      SCREENHOUSE  591.00 WESW PUMP RM,                              591.00  Yos  Soundly Spectrum vs. SSE                Yes          Yes    Yos 702          DISCHARGE SHUTOFF VALVE                                                                                      Ground R          S 1-WMO.      0  ESWI WEST ESW SUPPLY HEADER        TURBINE  569.00 ESW PIPE TUNNEL                                    .Yes  Beaxsng Spectrum vs. SSE                Yes            Yes    Yes 705          CROSSTIETOVNIT220 MOTOR                                                                                      Gnxaxl Response Spectrum OPERATEO SHUTOFF VALVE 8      1-WMO      0  ESWI EAST ESSENTIAL SERVICE      TURBINE  569.00 ESW PIPE TUNNEL, 25'E.,OF MIDDLE                        Bounding Spectrum vs. SSE      Yes    Yes    NIA    Yes 707          WATER SUPPLY HEADER                                WATERTIGHT DOOR, S ABOVE FLR                            Ground Response Spectrum CROSSTIETO VNIT220 MOTOR OPERATED SHUTOFF VALVE 1.WMO.      0  AFWI ESW TO WEST MOTOR DRIV      TURBINE  591.00 W MOTOR DRIV AUX FDWTR PUMP RM, 3' E        591.00  Yes  Boundatg 8 peotium vs. SSE    Yes    Yes            Yes 744          AUX FEEDWATER PUMP PP4W                            OF WMDAFWPP, 2'ABOVE THE FLR                            Ground Response Spectnan SHUTOFF 4 MOTOR OPERATED VALVE Certification:
Allthe information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed pr fessional engineer.)
I>e          1                                                                                      t rg Print or T pe Name                                i  nature                        Date                    Print or Type Name                            Si naure                    Dae
 
Walkdown:, of11/8/93                                                                          DC C          IIT1                                                                                Page  5of 5 SCREENING VERIFICA          . 1( DATA SHEET    (SVDS) iiem    Eq. Ci  Equip.io Rev                                                                Room or RowrCohmn                                  Capacay vs.          cap >  Caveais Anchor          E~
No. Ho                                                                                                                    Demand Basis          Demand?  OK?      OK7            OK7 61      6      1-WMO-    0  AFWI(ESWTOTURBDRIVAUX                      591.00 TURB DRIV AUX F DWTR PUMP RM, IN THE NW    591.00 Yes    Bouncsns Specoum vs. SSE              Yes            Yes 753        FEED PUMP PPA) SHUTOFF 6                          PART OF THE RM, 2' OF THE N WALL,6' OF                  Ground Response Speceum MOTOR OPERATED VALVE                              THE AFW PP TURBINE 14N4E49, 4'BOVE THE FLIL 1-WMO-    0  AFWl(ESWTO EAST MOTOR DRIV      TURBINE    591.00 E MOTOR DRIV AUX F DWTR PUMP RM, IN THE    591.00 Yes    Boundng Specoum vs. SSE              Yes                    Yes 754        AUX FEED PUMP) SHUTOFF 4                          MIDDLEN PART OF THE RM, ON THE N WAU                    Ground Response S pecirum MOTOR OPERATED VALVE                              T N OF THE E MDAFWPP, S'BOVE THE FLR.
Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and conclusion (whether verified to be seismicagy adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
l    /Z Printer T peName                            Sgna    re                        Date                    Print or T  Name                            Si naure                      Date
 
Walkdown:    I/1        f July 18, 1992                                                              DC C        lntt1                                                                            Page  1 of 10 SCREENING VERIFICATION DATA SHEET (SVDS) kom  Eq.cl    Equp, ID            Rev                                                                Fkcr Elev.      Rocm or Rorr/Cokshn    Base Elev.        Cepacsr vs.      Cap>      Anchor        Equp No                                                                                                                          Demand Basis      Domd?      OK?          OK?
1      0    1-TK-253.1            0  CONTROL AIR/PRESSURIZER TR B PRESSURE RELIEF    CONTAINMENT      612.00  LOWER CONT QD &#xb9;4, AZ:275,    612.00    N/A    Judg/riant vs.          Yos VALVENRV.152 RESERVE CONTROL AIR TANK                                      1'ELOW THE PRESSURIZER                      Rearrstic Motfian DECK                                        Centered Fker Response S        a 2      0    1-TK-253-2            0  CONTROL AIR I PRZ TR A PRESSURE RELIEF VALVE    CONT/uNMENT      612.00  LOWER CONT QD &#xb9;4, AL275,    612.00    N/A    Judg/nonl vs.            Yos        Yes      Yes NRV-1 53 RESERVE CONTROL AIR TANK                                          1'ELOW THE PRZ DECK                        ROSLsdc Medkrn Centered Roor Re        eS      a 3      0    1-TK-2533              0  CONTROLAIR/PRESSURIZERTR B PRESSURE RELIEF      CONTAINMENT      650.00  UPPER CONT, ON THE          650.00    N/A    Judgment vs.        Yes  Yos VALVENRV-152 EMERG. AIR TANK                                              REACTOR SIDE OF THE                        Rearredo Merfran PRESSURIZERENCLOSURE,                        Centered Fker 5'ABOVE THE FUL                            R          Spectra 4      0    1  TK-2534            0  CONTROL AIR I PRESSURIZER TR A PRESSURE RELIEF  CONTAINMENT      65000    UPPER CONT, ON THE                            Judgment vs.        Yos  Yes        Yes    Yes
                                                                                                                                                              ~
VALVENRV-1 53 EMERG AIR TANK                                              REACTOR SIDE OF THE                        ROS1sdc Median PRESSURIZER ENCLOSURE                        Centered Roor
                          '4RV-112 Res        S      a 5      7                            0  NITROGEN (REACTOR PL/ACCUMULATORTANKOME4-        CONTAINMENT      612.00  ACCUMUIATORTANK&#xb9;1            612.00  Yes            Spect/um 1 NITROGEN SVPPLYNENT VALVE                                                AREA, No photo. OK ON                      vs. SSE Ground CRANEWAU. SIDE OF                              Response ACCVMUtATORTANK&#xb9;1                              Spectrum OME4I-1. 3'BOVE FLR.
6      7      I.IRV-116            0  RHR I ACCUMULATORTANKOME4-1 1 AIR OPERATED      CONTAINMENT      598.00  ANNULUS QUAD 1, AZ: 030.      598.00  Yes Bourxeng Spectrum          Yos OUTLET TO REACTOR COOLANT LOOP    &#xb9;I COLO LEG                              D2. F2. OK ON THE                          vs. SSE Ground TEST VALVE                                                                CRANEWALLSIDE OF THE                            Response WALKWAY.14 FT FROM                              Spectnm
                                                                                                                            &#xb9; COLUMN 4, 6 FT ABOVE FUL 7      7      1-IRV-1 22            0  NITROGEN(REACTOR PL/ACCUMULATORTANKOMEM          CON'rAINMENT    612.00  AGCVMVLATORTANK&#xb9;2            612.00  Yes Bounang Spectrum            Yes        Yos 2 NITROGEN SUPPLYNENT VALVE                                                AREA, ON CRANEWALLSIDE                      vs. SSE Ground OF WALKWAY,AT BASE OF                          Rosporlo ACCUMUlATORTANK&#xb9;1-                              Spectrum OMEJI-2, 1I7 FROM COLUMN
                                                                                                                  &#xb9;24, 3'ABOVE FUL 8      7      14RV-126              0  RHR/AGGUMULATORTANKOMEM20.75AIR                  CONTAINMENT      598.00  ANNULUS QUAD 2, AZ: 150,      598.0O  Yes Boundsrg Spectrum      Yos              Yos OPERATED OUTLET AND SAFETY INJECTION TO                                    ON THE CRANEWALLSIDE OF                    vs. SSE Ground REACTOR COOlANT LOOP 2 COLO LEG TEST VALVE                                THE WALKWAY,10 FT F ROM                        Response
                                                                                                                            &#xb9; COLUMN 23, 7 Fr ABOVE                          Spectrum FLR.
9      7      14RV-1 32            0  NITROGEN (REACTOR PL I ACCUMULATORTANKOME4I-    CONTruNMENT      612.00  AGCVMUIATORTANK&#xb9;3            612.00  Yes Bounceng Spectrum      Yos  Yos        Yos 3 NITROGEI/ SUPPLYNENT VALVE                                              AREA, ON CRANEWALLSIDE                      vs. SSE Ground OF WALKWAY,3'ROM                                Response ACCUMULATORTANK&#xb9;1-                              Spectrum OME%4. 3'BOVE FLR.
10    7      1.IRV-1 36            0  RHR I ACCUMULATORTANKOME4r3 OUTLET AND          CONTAINMENT      598,00  ANNULUS QUAD 3, AZ: 219,      598.00  Yes Bourdsrg Spectnsn                N/A SAFETY INJECTION TO REACTOR COOLANT LOOP 3                                ON THE CRANEWALLSIDE OF                    vs. SSE Ground COLO LEG 0.75 AIR OPERATED TEST VALVE                                      THE WALKWAY.NEAR                                Response COLUMN &#xb9;17, 3 FT ABOVE                          S pact/um THE FLR.
Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                                        Ig  ature                      ate                      Print or T pe Name                                nature              Date
 
Walkdown: I/.          f July 18, 1992                                                            DC C        Jnit1                                                                            Page 2 of 10 SCREENING VERIFICATION DATA SHEET (SVDS)
Item  Eq CI    Equip. ID    Rav No System/Equtpmont Descnpten                            Fkor Elev.      Room or Row/Column                                    Cap >
Demd?
                                                                                                                                                                                          'nchor Caveats OK?      OK?
EquSr OK?
1-IRV-142      0  NITROGEN IREACTOR PL I ACCUMULATORTANKOME4i.          CONTAINMENT    612.00  ACCUMULATORTANK&#xb9;4            612.00 Yes Boundng Speci/um    Yes    Yos 4 NITROGEN SUPPLY/VENT VALVE                                                  AREA ON CONT WALLSIDE                    vs. SSE Ground OF ACCUMULATORTANK      &#xb9;I-                  Response OME4I-4, 3'ROM COLUMN                        Spectrum
                                                                                                                &#xb9;9. NEAR FLR 12          14RV-146        0  RHRIACCUMUtATORTANKOME~            1 AIR OPERATED    CONTAINMENT    598.00  ANNULUSQUAD 4. AL 320,        598.00 Yes Boundng Spectrum    Yes                Y8$    Yes OUTLET AND SAFETY INJECTION To REACTOR                                        ON THE CRANEWALLSIDE OF                  vs. SSE Grand COOLANT LOOP 4 COLD LEG TEST VALVE                                            THE WAUN/AY.NEAR                              Response
                                                                                                                          &#xb9; COLUMN 4, 3 FT ABOVE                          Spectrum FLR 13          14RV-147        0  RHRI WEST RHR AND SOUTH SAFETY INJECTION TO          CONTAINMENT    612.00  HVCEQ-2 FAM RM, ON THE        612,00 Yes Boundng Spectnsn    Yos                Yos    Y8$
REACTOR COOLANT LOOPS 2 AND 3 0.75 AIR                                        CONT WALLSIDE OF THE                      vs. SSE Ground OPERATED TEST VALVE                                                            WALKWAY,3 FT FROM CL    &#xb9;                    Response
: 26. 2 FT ABOVE FLR.                          S pact/um 14            1-IRV-148      0  RHR/EAST RHR AND NORTH SAFETY NJECTION TO            CONTAINMENT    612.00  HV4:EQ-2 FAN RM, ON THE      61200  Yes Boundng Spactnsn REACTOR COOlANT LOOPS 1 AND 4 0.75 AIR                                        CONT WALLSIDE OF THE                      vs. SSE Ground OPERATED TEST VALVE                                                            WALKWAY,NEAR THE                              Respons8 STAIRWAY, N A CORMER. 2                      Spectrum FT ABOVE FLR.
15          1.IRV-149      0  RHR I WEST RHR TO REACTOR COOLANT LOOPS 2 AND        CONTAiNMENT    612.00  HV<EQ-2 FAN RM. ON THE        612.00 Y8$ Boundng Spect/um    Yes            WA 3 0.75 AIR OPERATED TEST VALVE                                                CONT WALLSIDE OF THE                      vs. SSE Ground WALKWAY,1 FT FROM                            Response COLUMN &#xb9;26. 2 FT ABOVE                        Spectrum THE FLR.
16          14RV-150        0  RHR I EAST RHR TO REACTOR COOLANT LOOPS      1 AND 4 CONTAINMENT    612.00  HVNEQ-2 FAN RM. ON THE        612.00 Yes Boundng Spectnsn    Yes            WA 0.75 AIR OPERATED TEST VALVE                                                  CONT WALLStDE OF THE                      vs. SSE Ground WALKWAY,IN A CORNER.                          Response NEAR THE STAIRWAY.2 FT                        Spectrum ABOVE FLR 17            1-IRV40        0                      I BORON INJECTION BORON NJECTION TO                    CONTAINMENT              ANNULUSQUAD 2. ALt21, ON            Yes Boundng Spectrum                        Yos    Yes ACCUMULATORFILL LNE 1 AIR OPERATED CONTROL                                    THE CONT WALLSlOE OF THE                  vs. SSE Ground VALVE                                                                          WALKWAY,NEAR COLUMN                          Response
: 26. 1'ABOVE FLR                              Spectrum 18                          0  SAFETY INJECTIONI SAFETY INJECTtoN To                CONTAINMENT    598.00  ANNULUSQUAD 2, AZ:155, ON    598.00 Yas Boundng speci/um    Yes            N/A        Yes ACCUMULATORFILL LNE 1 AIR OPERATED CONTROL                                    THE CONT WALLSIDE OF THE                  va SSE Ground VALVE                                                                          WALKWAY,NEAR COLUMN                          Response
: 26. 1'BOVE THE FLR                            Spectrum 19          144RV-1st        0  NUCLEAR SAMPUNG I STEAM GENERATOR 1 STEAM            CONTAINMENT    612.00  E CONT LOWER VENT RM, ON      612.00 Yos Borndng speci/um    Yes            WA  Yas    Yes SAMPLE MSX-101 0.5 AIR OPERATED CONTAINMENT                                    THE CRANEWALLSIDE OF                      vs. SSE Ground ISolATION VALVE                                                                THE WALKWAY,1ty FROM                          Raspcnse COLUMN 6. 2'BOVE THE                          Spectrum FLR.
14VIRV-\52      0  NUCLEAR SAMPLING I STEAM GENERATOR 2 STEAM            CONTAINMENT    61200    W CONT LOWER VENT RM.        612.00 Yas Boundng Spactnm    Yes            WA  Yes    Yas SAMPLE MSX.102 0.5 AIR OPERATED CONTAINMENT                                    ON THE CRANEWALLSIDE OF                  vs. SSE Ground ISOlATION VALVE                                                                THE WALKWAY,1$ FROM                          Response COLUMN 21 ~ 1'BOVE THE ~                      Spectrum FLR
: 21.          144RV-153      0  NUCLEAR SAMPLINGISTEAM GENERATOR 3 STEAM              CONTAINMENT    612.00  W CONT LOWER VENT RM,        612.00 Yes Boundng Spect/um                    WA  Yes SAMPLE MSX-103 0.5 AIR OPERATED CONTAINMENT                                    ON THE CRANEWALLSIDE OF                  vs. SSE Ground ISOLATIONVALVE                                                                THE WAlKWAY,1$ FROM                          Respcnse COLUMN 21, 1'ABOVE THE                        Speci/um FLR Certification:
All the information contained on this Screening Vedfication Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Vl Print or Type Name                                    Si na    re                      Date                      Print or T pe Name                        Sig  ture                Date
 
Walkdown:      IIL        f July  18, 1992                                                            DC C        Jnit  1                                                                                    Page3of10 SCREENING VERIFICA      I N DATA SHEET (SVDS) item  Eq. Ci    Equp. ID                      System/Equipment Desc/ption                            Fkcr Eiev      Room or Raw/Coasnn                                    Capacsy vs.      Cap >              Eqvp Demand Basis    Demd?      OK?      OK?
22      7      14IRV.1 54          NUCLEAR SAMPLING I STEAM GENERATOR 4 STEAM          CONTAINMENT    612.00  E CONT LOWER VENT RM, ON                    6'I 2.00 Yes Baundng Spectrum          Yes NIA SAMPLE MSX-104 0.5 AIR OPERATED CONTAINMENT                                  THE CRANEWAU. SIDE OF                                      vs. SSE Ground ISOlATION VALVE                                                              THE WALKWAY,tty FROM                                          Response COLUMN 6, 2'BOVE THE                                          Spectrum FLR.
23      7      1 +RV-1 01      0    NUCLEAR SAMPLING I REACTOR COOLANT LOOP      1 HOT  CONTAINMENT    598.00  ANMULUSQUAD 1, AZ 016, ON                            Yes Bourxhng Spectrum    Yes  Yes            Yes LEG SAMPLE NSX-1 01 SHUTOFF VALVE                                            CONT WALLSIDE OF                                          vs. SSE Grand WALKWAY,7 FROM COL 5,                                          Response FLR.                        8'BOVE Spectrum 24      7      1&RV 102            NUCLEAR SAMPLING I PRESSURIZER UQUID SPACE          CONTAINMENT    612.00  INSTRUMENTATIONRM.                          612.00  Yes Boundng Speci/um          Yes NIA SAMPLE NSX-102 0.5 AIR OPERATED SHUTOFF VALVE                                        LOWER CONT      6'BOVE vs. SSE Ground ENTRANCE DOOR ON A                                            Response LEDGE. E OF SEAL TABLE.                                      Spectrum 25      7      1&RV-103        0    NUCLEAR SAMPLING I REACTOR COOLANT LOOP 3 HOT        CONTAINMENT    598.00  ANNULUSQUAD 3, AZ:210, ON                            Yes Boundng Spear/um    Yes  Yes NIA LEG SAMPLE NSV.103 SHUTOFF VALVE                                              CONT WALLSIDE OF                                          vs. SSE Ground WALKWAY,BY COLUMN 19,                                          Response FLR.                      8'BOVE speci/um 26      7      1&RV-104        0    NUCLEAR SAMPLING/ PRESSURIZER STEAM SPACE            CONTAINMENT    612.00  INSTRUMENTATIONRM.                          612.00  Yes Boundng Specuum              N/A        Yes SAMPLE NSX-104 0.5 AIR OPERATED SHUTOFF VALVE                                        LOWER CONT      6'BOVE vs. SSE Ground ENTRANCE DOOR, ON A                                          Response LEDGE. E OF THE SEAL                                          Spect/um TABLE.
27      7      1+RV-1st        0    PRESSURIZER  I PRESSURIZER'8'RESSURE      RELIEF    CONTAINMENT    650.00  PRESSURIZER ENCLOSURE                                      1.5 x Boundng      No VAlVE                                                                        INTERIOR, IN PRZ                                            S peat/um vs.
ENCI.OSURE, ON THE 686 EL                                Reafntic Median PtATFORM. 2'BOVE                                          Centered Raor GRATING                                                  Re          S    a 28      7      14/RV-152      0    PRESSURIZER/PRESSURIZER'8'PRESSURE        RELIEF    CONTAINMENT              PRESSURIZERENCLOSL/RE                                NIA  1.5 x Boundng      No  Yes VALVE                                                                        INTERIOR. IN PRZ                                            Spectrum vs.
ENCLOSURE. ON THE 686 EL                                  Reatstic Median PtATFORM, 2'ABOVE                                          Centered Roar GRATING                                                  Re          S    a 29      7      1 +RV-1 53      0    PRESSURIZER/PRESSURIZER'A'PRESSURERELIEF            CONTAINMENT    650.00  PRESSURIZER ENCLOSURE                                N/A  1.5 x Boundng      No  Yes    Yes VALVE                                                                        NTERIOR, IN PRZ                                            Spectrum vs.
ENCLOSURE. ON THE 686 EL                                  Rearisbc Median PLATFORM. NEAR ACCESS                                      Centered Fkor lADDER 2'BOVE GRATING                                    Re          S 30      7      1&RV-163        0    REACTOR COOLANT I REACTOR COOLANT LOOP 3 TO          CONTAINMENT    612.00  LOWER CONT QUAD 3.AZ                        612.00  Yes Brxndng Spectrum    Yes  Yes PRESSURIZER 4 A!R OPERATED LVE                                                270, OM THE CRANWALLSIDE                                  vs. SSE Ground OF THE WALKWAY,NEAR                                          Response RCP &#xb9;3, 7 ABOVE 617 EL                                        Spectrum PlATFORM 31      7      1&RV 164        0    REACTOR COOLANT I REACOR COOLANT LOOP 4 TO          CONTAINMENT    612.00  LOWER CONT QUAD 3, AZ                      612.00  Yes Boundng Spectrum    Yes      N/A Yes    Yes PRESSURIZER SPRAY 4 AIR OPERATED CONTROL                                      270. OM THE CRANWALLSIDE                                  vs. SSE Ground VALVE                                                                        OF THE WALKWAY,NEAR                                          Respanse RCP &#xb9;3, 7 ABOVE 612'L                                        Spectrum PlATFORM 32    7        1<RV-10        0  REACTOR COOLANT PUMP/RCP 1 SEAL1 LEAKOFF To          CONTAINMENT    617.00  LOWER COMT QUAD 1, AZ                                    Boundng Spectnnt    Yes  Yes N/A Yes RCP SEAL WATER RETURN FILTER QC-109 2 AIR                                    055, OM THE CRANEWALL                                    vs, SSE Graund OPERATED SHUTOFF VALVE                                                        SIDE OF THE WAlKWAY,                                          Response THE 617 EL          2'BOVE S peat/um PLATFORM Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
yz Print or T pe Name                                            ture                      Date                      Print or T pe Name                                            nature          D te
 
INalkdown: V            f July  18, 1992                                                        DC C          Jnit1                                                                              Page 4 of 10 SCREENING VERIFICATION DATA SHEET (SVDS)
Iten Eq. Ci    Equip ID    Rav                                                                  Fioor Eiov.      Room or Row/Column                      capacity vs,    Cap > Caveats Anchor Interact Eqtsp No                                                                                                                            Demand Basis      Demd?  OK?    OK?    OK?    OK?
1<RV-111        0  GVCS / REACTOR COOLANT NORMAL LETDOWN TRAIN      CONTAINMENT      612.00    LOWER CONT QUAD 4, AZ          612.00 Yes Boundeg  S pecuum  Yes    Yes            Yes    Yes
                                  'A'HUTOFF VALVE                                                              290. ON THE CRANEWALL                      vs. SSE Ground SIDE OF THE WAlKWAY,1 tr                      Response FROM THE LOWER CONT. 612                      Spectrum AIRLOCKCRANEWALLOR.
ABOVE RCP &#xb9;4, ON THE 612 EL PLATFORM 14?RV-112        0  CVCS / REACTOR COOLANT NORMALLETDOWN TRAiN        CONTAINMENT      612.00    LOWER CONT QUAD 4, AZ          612.00 Yes Boundeg Spectrum    Yas  Yos    N/A    Yes    Yes
                                  'Ir SHUTOFF VALVE                                                            290, ON THE CRANEWALL                      vs. SSE Grand SIDE OF THE WALKWAY,                          Reaper>>e 10'ROM THE LOWER CONT. 61 2                    Spectrum AIRLOCKCRANEWALLDIL ABOVE RCP &#xb9;4, ON THE 61 2 EL PlATFORM 14?RV-113        0  CVCS/REACTOR COOlANT EXCESS LETDOWN TO            CONTAINMENT      612.00    LOWER CONT QUAD 4, AZ          612.00 Yos Boundeg Spectrum    Yes  Yes    N/A    Yes    Yes EXCESS LETDOWN HEAT EXCHANGER HE-13 1 AIR                                    290, ON CRANEWALLSIDE OF                  vs. SSE G/ound OPERATED'Ir SHUTOFF VALVE                                                    THE WALKWAY,10'ROM                            Response THF LOWER CONTNMENT 612                        Spactnsn AIRLOCKCRANEWALL ENTERANCE DR, ABOVE RCP&#xb9;4, ON THE 612 ELEV PLTFRM 1 &RV-114      0  CVCS / REACTOR COOlANT EXCESS LETDOWN To          CONTAINMENT      612.00    LOWER CONTIANMENTQUAD          612.00 Yes Botndeg Spectnsn    Yos  Yes            Yes EXCESS LETDOWN HEAT EXCHANGER HE-13 1 AIR                                    4, AZ 290. ON CRANEWALL                    vs. SSE Ground OPERATED 'A'HUTOFF VALVE                                                    S IDE OF THE WALKWAY,                          Response 10'ROM LOWER CONTNMENT                        Speci/um 612 AIRLOCKGRAN EWALL ENTERANCE OR, ABOVE RCP&#xb9;4, ON THE 612 ELEV PLTFRM 37    7    14?RV-150        0  REACTOR COOLANT PUMP / REACTOR COOLANT PUMPS      CONTAINMENT                ANNULUS QUAD 2 AZ 153 ON              Yes Boundeg Spectrum    Yes  Yes                    Yes STARTVP SEAL SYSTEM BYPASS To SEAL WATER                                    THE CRANEWALLSIDE OF                      vs. SSE Ground RETURN FILTER Qc-109 0 75 AIR OPERATED SHUTOFF                              WALKWAY,NEAR COLUMN                            Response VALVE                                                                        &#xb9;23. 4'BOVE THE FLR                            S l&RV-20        0  REACTOR COOLANT PUMP /RCP 2 SEAL 1 LEAKOFF TO    CONTAINMENT      617.00    LOWER CONT QUAD 2, AZ                Yos Boundeg Spectrum    Yes  Yes    N/A RCP SEAL WATER REIVRN FILTER Qc-109 2 AIR                                    125, ON THE CRANEWALL                      vs. SSE Ground OPERATED SHUTOFF VALVE                                                      SIDE OF RCP &#xb9;3 ON THE 617                      Response EL PLATFORM, 2'BOVE THE                        Spectrum GRATING 39    7      14?RYE        0  REACTOR COOLANT PUMP / RCP 3 SEAL 1 LEAKOFF TO    CONTAINMENT      612.00    LOWER CONT QUAD 3, AZ          612.00 Yos Bwndeg Spoctnsn      Yes          N/A            Yes RCP SEAL WATER RETURN FILTER QC-109 2 AIR                                    240. ON THE CRANEWALL                      vs. SSE Ground OPERATED SHUTOFF VALVE                                                      SIDE OF THE WAlKWAY,                          Response NEAR RCP &#xb9;3, 1'BOVE 612                        Spectrum EL PLATFORM 1&RV~          0  REACTOR COOLANT PUMP /RCP 4 SEAL 1 LEAKOFF TO    CONTAINMENT      612.00    LOWER CONT QUAD 4, AZ          612.00 Yes Boundeg Spectrum    Yes  Yos    N/A    Yes    Yos RCP RETURN FILTER QC-1092 AIR OPERATED                                      330. NEAR RCP &#xb9;4 SEAL 6                    vs. SSE Ground SHUTOFF VALVE                                                                THE CARNEWALI AT THE                          Response PUMP, 2'ABOVE THE 612 EL                      Spectrum PlATFORM Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entiy and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                                    i  ture                      ate                        Print or T pe Name                          S'ture                    Date
 
Walkdown:                July 18, 1992                                                      DC CO          nit 1                                                                                  Page    5of10 SCREENING VERIFICATION DATA SHEET (SVDS) item  Eq. Cl  EquiP. ID    Rev              System/Ersapment Descnption                      Fkxx Elev.      Room or Rcw/Co4mn                                      Cap >  Cav eats Anchor  ax erect  Equp No                                                                                                                                        Demd?    OK?      OK?    OK'7      OK?
41      7      1.SVA5A      0  / SAFETY RELIEF VALVE                          CONTAINMENT    650.00    PRESSURIZER ENCLOSURE                N/A    1.5 x Bourxteg            Yes              Yes      No Spect/um vs.
Rear>>dc Median Centered Boor Reaper>>a S 42      7      1~%5B            / SAFETY RELIEF VALVE                          CONTAINMENT    650.00    PRESSURIZER ENCLOSURE                      1.5 x Boundeg      No      Yes                        No Spectrum vs.
Rear>>tic M/xrran Centered Floor Respor>>e Spectra 43      7      1<v<5C            / SAFETY RELIEF VALVE                          CONTAINMENT    650.00    PRESSURIZER ENCLOSURE                      1.5 x Boundeg      No                        Yes Spectrum vs.
Rear>>tic Mtxf>>n Centered Floor Response Spectra 1 <V40      0  /SAFETY RELIEF VALVE                          CONTAINMENT    598.00    ANNULUS. QUAD 3                      Yes  Boundeg Spectrum                      N/A      Yes      Yes vs. SSE Ground
 
===Response===
Rasped>>e S
45      7      1<V<I            / SAFETY RELIEF VALVE                          CONTAINMENT    598.00    ANNULUS, QUAD 4                          Soundly Specaum    Yes      Yes              Yes      Yes vs. SSE Ground CCW/ EXCESS LETDOWN HEAT EXCHANGER HE-13      CONTAINMENT    598.00    ANNULUS, QUAD3                            Bouixang Spectrum  Yes                        Yes CCW OUTLET SAF ETY VALVE                                                                                            vs. SSE Ground
 
===Response===
47      8    14CM-111      0  RHR/RHR TO REACTOR COOLANT LOOPS 2 AND 3      CONTAINMENT    598.00    ANNULUS QUAD 2 AZ:126, ON            Yes  Boundeg Spectrum    Yes                        Yes COLO LEGS CONTAINMENTISOLATIONVALVE                                      THE CRANEWALLSIDE OF                      vs. SSE Ground THE WALKWAY,10 FEET                            Response FRQM coLUMN <<25, 5 FEET                        Spect/um ABOVE FLR 48      8    1-ICM-129      0  RHR / REACTOR COOLANT LOOP 2 HOT LEG TO RHR    CONTAINMENT    598.00    ANNULUS QUAD 2. AZ: 135,                  Bouodng Speci/um            Yes              Yes PUMPS SUCTION CONTAINMENTISOLATIONVALVE                                  ON CRANEWALLSIDE OF                        vs. SSE Ground WALKWAY,10FT FROM                              Response coLUMN <<24, 6FT. ABQYE                        Spectrum FLR 49      8    14MO-128      0  RHR/REACTOR COOLANT LOOP 2 HOT LEG To RHR      CONTAINMENT      598.00  LOWER CONT QUAD 2. ON                Yes  Boundrng Spect/um  Yes      Yes              Yes PUMPS SUCTION SHUTOFF VALVE                                              PLATFORM AT LOOP 2                        vs. SSE Ground HOTLEG, UNDERNEATH SG                          Response S2. COL BETWEEN SG AND SHIELD WALLAT 808 EL 50    8    14MO415        0  RHR/EAST RHRAND NORTH SAFETYNJECTIONTO        CONTAINMENT    612.00    E CONT LOWER VENT RM, 8      612.00      Boundsvg Spectrum                              Yes      Yes REACTOR COOLANT LOOPS    1 AND 4 HOT LEGS                              FEET FROM CONT LOWER                      vs. SSE Ground SHUTOFF VALVE                                                            COMPARTMENT Q D 84                            Response VENTILATIONUNIT $ 14tV-                        Spectrum CLVQ, 10 FEET FROM COLe 7, 5 FEET ABOVE FLR Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or Type Name                                  S'ture                    Date                        Print or T pe Name                            nature                        Dae
 
Walkdown:    ..I      Uf 11/8/93                                                              DC CO            r1 SCREENING VERIFICATI 8 DATA SHEET (SVDS) age      1 ofS Equip.ID  Rev      system/Eqiitpment Descnption              Floor            Rocm or Row/Cotumn                                    Capaccy vs.            Cap >  C avesta Anchor              Equip No.      No                                                Elev.                                                                  Dem<<xi Bash            Dam and7  OK7    OK7                  OK7 7    I-IRVCIO    0  RHR I EAST RHR HEAT                                E RHR HEAT EXCHANGER RM, N THE SE          609.00  WA    1.5 x Boutvhng Spectrum vs.        Yes                                  Yes EXCHANGER HE-17E 8 AIR                                              r REGN OF THE RM. SE OF E RHR HEAT                        Rearisdc M<<san Centered Fkor OPERATED OUTLET FLOW                                EXCHANGER, 1'BOVE 615 EL PLATFORhL                            Response Spectra CONTROL VALVE 7    14RV411      0  RHR I RHR HEAT EXCHANGERS                          E RHR HEAT EXCHANGER RM, N THE SW                        1.5 x Bourx4ng Spectrum va        Yes      Yes                        Yes BYPASS FLOW 8 AIR OPERATED                          REGN OF THE RM, 1 ty SW OF E RHR HEAT                  Rea%stic  M<<fian Centered Fker CONTROL VALVE                                      EXCHANGER 3'BOVE 61 5 EL PlATFORM.                            Response Spectra 7    1-IRV420    0  RHR I WEST RHR HEAT                AUXILIARY 609.00 W RHR HEAT EXCHANGER RM, IN THE SE        609.00  N/A  1.5 x Bounding Spectrum vs.                  Yes EXCHANGER KE-17WB AIR                              REGNOF RM.3'SEOFWRHRHEAT                                Reasssc M<<fian Centered Fker OPERATED OUTLET FLOW                                EXCHANGER, 1'ABOVE THE 615 EL                                  Response Spectra CONTROL VALVE                                      PlATFORM.
7    14tIRV-Zt 1  0  MAN STEAM I STEAM GENERATOR                        E MAINSTEAM STOP ENCLOSURE, N SW                        L5 x Bounding Spoct/um vs.        Yes                                  Yos 1 STOP VALVEMRV-210 STEAM                          REGN OF RM. 6' OF STEAM STOP VALVE1-                    Realissc M<<flan Cantered Fkor CYUMDER'A'UMPVALVE                                  MRV-210. 6'BOVE THE 640 EL PlATFORM.                          Re        S 7    WARY.212      0  MAINSTEAM I STEAM GENERATOR        AUXILIARY        E MAINSTEAM STOP ENCLOSURE, IM THE SW      633.00  N/A  1.5 x Bounding Spectrum vs.        Yes      Yes                        Yes 1 STOP VALVEMRV412 STEAM                            REGN OF THE RM, 4'W OF STEAM STOP                      Rearissc M<<San Centered Fkor CYUMDER 'Iy DUMP VALVE                              VALVEWARV410, 6'BOVE THE 640 EL                                Response Spectra PlATFORM.
7    14!RV.213    0  MAINSTEAM I STEAM GENERATOR                        E MANSTEAM STOP ENCLOSURF IN THE SW      633.00  N/A  1.5x Bouncy spectrum vs.          Yos                                  Yes OME4.1PORV                                          REGN OF THE RM,4'WOF STEAM STOP                        Resinic Median Centered Floor VALVEWARV410, 6'BOVE THE 640 EL                                Respcnse Spectra PLATFOIU/L 7    WARY-241      0  MAN STEAM I STEAM GENERATOR        AUXILIARY 633.00 E MAINSTEAM STOP ENCLOSURE, IN THE NW 633.00      N/A    1.5 x Bounrang Spectrum vs.      Yes      Yss    NIA    Yss          Yes 4 STOP VALVEMRV-240 STEAM                          REGN OF THE RM. S N OF STEAM STOP VALVE                Rearisdc M<<yisn Centered Boor CYUNDER    'A'UMP VALVE                            WARV-240, 6'BOVE THE 640 EL PLATFORM.                          Res      eS      s 7    14%V 242      0  MAIMSTEAM/STEAM GENERATOR                          E MANSTEAM STOP ENCLOSURE, IM THE NW 633.00        NIA    L5 x Bounding Spect/um vs.                                              Yos 4 STOP VALVEMRV440 STEAM                            REGN OF THE RM, 3'WOF STEAM STOP                        Realhtic M<<ssn Centered Boor CYLNDER '8'UMP VALVE                                VALVE14ARV.240, 6'BOVE THE 640 EL                              Response Spoctnl PLATFO RLL 7    14ARV.243      0  MAINSTEAM I STEAM GENERATOR                        E MAIN STEAM STOP ENCLOSURE, IN THE NW 633.00      N/A    1.5 x Boundsxt Spectrum vs.      Yes      Yes            Yes          Yos OME44 PORV                                          REGM OF THE RM. 3'OF    STEAM STOP                    Reatsdc MecEan Cantered Fkor VALVEWARY-240, 6'BOVE THE 640 EL                              Response S pectra PLATFORLL 10    7    14V-1 04E      0  RESIDUAL HEAT REMOVAIEAST          AUXILIARY 609.00 EAST RHR HEAT EXCHGR RM. N THE ME                        1.5 x Bounding Spectrum vs.      Yes      Yes            Yes          Yes RESIDUAL HEAT REMOVALHEAT                          CORNER OF THE RM, 6 FT NE OF EAST RHR                  Rearisdc M<<fian Cent<<ed Boor EXCHANGER KE-17E OUTLET                            HEAT EXCHANGER &#xb9;14IE-17E. 2 FT ABOVE                          Response S pectra SAFElY VALVE                                        THE GRATING 7    14V 104W      0  RESiDUALHEATREMOVAIWEST                            W RHR HEAT XCHGR RM, 5 FT NE OF THE                      LS x Boundng Spectrum va                                                Yos RESIDUAL HEAT REMOVALHEAT                          WEST RHR KEAT EXCHANGER                                Realistic M<<fian Centered Floor EXCHANGER HE-1 7W OUTLET                                                                                          Response Spectra SAFETY VALVE 7      14V-14E      0  ESWI EAST CONTAINMENTSPRAY                          E CONT SPRAY HEAT XCHGR RM                                1.5 x Bou/xsng spectrum vL        Yes      Yes HEAT EXCHANGER KE-1 BE SIDE                                                                                Rsarissc Median Centered Floor SAFETY VALVE                                                                                                        R        8 13    7    14V.14W      0  ESWI WEST CONTAINMENTSPRAY                          W CONT SPRAY HEATXCHGR RM                                1.5 x Boundrtg Spoct/um va HEAT EXCHANGER HE-1 SW SIDE                                                                                Realistic Median Centered Fkor SAFETY VALVE                                                                                                        R        S 14      7    14V-15E      0  ESSENTIAL SERVICE WAI EAST        AUXILIARY 609.00 HALLWAY,ON SE CORNER OF UNIT 1 EAST        609.00  WA    1.5 x Bounding Spect/um va        Yes      Yes            Yes COMPONENT COOLNG WATER                            CCW KEAT EXCHANGER &#xb9;WIE-I5E                            Rearadc M<<rien Centered Fker HEAT EXCHANGER HE.1 5E TUBE                                                                                        Response Spectra SIDE SAFETY VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures af all Seismic Capability Engineeis an the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory shoukl be a licensed professional engineer.)
iz    Ir////5                                                                                            /Zbtp  /9S'ate Print or Type Name                                  Si n ure                        Date                    Printor T pe Name                                Si nature
 
Watkdown:    ~    n of 11/N93                                                            DC C            .T1                                                                                    'age2of5 SCREENING VERIFICA<<~N DATA SHEET (SVDS)
Etsjp.lD  Rev                                            Fker                                                                      Capacitf vs.            Cap >  Cavsats Anchor          Equip No. No                                            Elev.                                                                    Dam<<xi Basis            D<<n and?  OK7    OK?            OK?
15    7    'l4V-15W    0  ESSENTIAL SERVICE WAIWEST                  609.00  HALLWAY,ON SE CORNER OF WEST UNn'                        1.5x Boundeg Spectrum vs.                  Yos    NIA            Yes COMPONENT COOUNG WATER                            CCW HEAT EXCHANGER 614IE-1 SW                          Rearstic M<<fish Cantered Boor HEAT EXCHANGER HE-15W TUBE                                                                                        Response Spectra SIDE SAFHY VALVE 16    7    I SV-1A.1  0  MAINSTEAM I STEAM GENERATOR    AUXILIARY  633.00  E MAIN STM STOP ENCL                                      1.5 x Boundeg Spectrum vs.        Yes                      Yes    Yes OME4-1 SAFETYVALVE1A                                                                                        Rearnsc Median Centered Floor Respcnso S 7    14V-1AM    0  MAWSTEAM I STEAM GENERATOR                633.00  E MAW STM STOP ENCL                                      1.5 x Boundeg Specuum vs.        Yes            NIA      Yes OMEGA SAFElY VALVE1A                                                                                        Rearssc Median Center<<l Fkxx R        S
                                                                                                                                                ~
16    7    14V-1 8-1  0  MAW STEAM/STEAM GENERATOE                  633.00  E MAW STM STOP ENCL                                      15 x Bound eg 8 poctnsri vs.      Yes      Yes            Yes OME4.1 SAF HY VALVE18                                                                                      Realssc M<<fian Centered Roor-Re        S 19    7    14V-1~      0  MAINSTEAM I STEAM GENERATOR                633.00  E MAWSTM STOP ENCL                                        1.5x            Spectrum vs.      Yes      Yes            Yes    Yos OME~ SAFETY VALVE18                                                                                        ROOKssc  M<<fian Centered Fkxx Response S 7    14V-2A.t    0  MAW STEAM I STEAM GENERATOR                633.00  E MAWSTM STOP ENCL                                        1.5 x Bounc4ty Spectrum vs.
OME4-1 SAFETY VALVE2A                                                                                      Realisdc M<<fian Centered Boor R
21    7    14V-2AR    0  MAW STEAM I STEAM GENERATOR    AUXILIARY  633.00  E MAINSTM STOP ENCL. 6 FT NORTH OF                        1.5 x Brxedeg Spectnsn vs.        Yes            NIA OME44 SAFHY VALVE2A                                STEAM STOP VLV<<14lRV-240, OFF THE 640                    Reatntic M<<fish Centered Boor ELEVATIONPLATFORM                                              R        S 7    14V-28-1    0  MAINSTEAM I STEAM OME4-I                  633.00  E MAINSTM STOP ENCL                                      1.5x Boundeg Spoctruni vL        Yes                      Yes SAFETY VALVE28                                                                                              ROSSstic M<<fian Centered Fker R        8
                                                                                                                                                ~
7    14V-284    0  MAW STEAM I STEAM GF NERATOR              633.00  E MAINSTM STOP ENCL                                      1S x Boundeg Spectrum va,                  Yes            Yes OME44 SAFETY VALVE28                                                                                        Reasssc Median Centered Floor Re        S 24    7      14V4-1      0 MAW STEAM I STEAM GENERATOR                633.00  E MAW STM STOP ENCL                                      1.5 x          Spectrum vs.      Yes                      Yes    Yes OME4-1 SAFHY VALVE3                                                                                        Rearissc M<<fian Centered Roor Res      eS 25    7      14V44      0 MAIN STEAM I STEAM GENERATOR              633.00  E MAW STM 6'rOP ENCL                                      1$ x Boundeg Spectrum va                                  Yes    Yos OME44 SAFETY VALVE3                                                                                        Rearssc M<<fian Centered Boor R        S      a 7      14V46      0 CCW I                                      609.00  609 HALLWAY                                              1.5 x Boundeg Spectrum vs.                                Yes    Yes Rearistic Median Centered Roor R
27    7      14V-71    0 CCWI NORTH SPENT FUEL PIT HTX              609.00  SPENT FUEL PIT IIEATXCHGR RM. AT THE                      1.5 x Boundeg Spectnsn  vs.      Yos                      Yos    Yes 12'-ISN CCWOUTLETSAFHY                            EAST END OF THE NORTH SPENT FUEL PIT                    Reatstic M<<fian Centered  Boor VALVE                                              HlXOt 24IE-1 6N. 12 FT ABOVETHE FLR                            R          S 7      14V.?2E    0 COMPONENT COOUNG WAIEAST                  609.00  HALLWAY,25 FT NWOF THE CVCS                            . 1$ x Boundeg Spectrum    vs. Yes                      Yos    Yos RESIDUAL HEAT REMOVALHEAT                          DEMWERAUZERS CENTRAL HALLWAY7 FT                        *Realsdc Median Centered  Boor EXCHANGER HE-1?E COMPONENT                        ABOVE THE 621 ELEVATION PLATFORM                                Response Spectra COOLWG WATER OUTLET SAFHY VALVE 14V-97    0 BORON WJ ECTION I BORON          AUXILIARY  612.00 BORON INJ TANKRM, 5 FT SE OF THE BORON    609.00  N/A    1.5 x Boundeg Spectrum va        Yes                      Yes    Yes INJECTION TANKTK-11 OUTLET                        WJECTION TAHITI IN SE CORNER OFTHE RM                    Rearsdc Median Ceraered Fker SAFETY VALVE                                                                                                        Respcese Spectra Certification:
Allthe information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Z II), &>>
Print or T pe Name                            Sign ure                          Date                  Print or Type Name                                Signature                    Date
 
1
 
Walkdown:            of gf26I94                                                            D.C. C            t1                                                                                  oage1 of1 SCREENING VERIFICAI            s)ATA SHEET (SVDS)
Eq.      Equip. ID    Rev                                                                Floor Elev.                                                                  Cap >  Gavaats              Equip No                                                                                                                                              Demand?  OIC?  OK7          OK7 0  CVCSI NORTH BORICACID BLENDER QP412 AIR        AUXILIARY        609.00    VOLUME CONTROL TANKE                        1 5 x Borxfing            Yes OPERATED TO CVCS CHARGING PUMP SUCTION                                      HALLWAY,ON THE E SIDE OF                      Spectrum vs.
SHUTOFF VALVE                                                                THE VCT SHIELD WAUON                      Rea5sdc Me(fisn THE WWALL                                    Cantered Roar Response S        a WlRV<51        0  BORONMAKEVPICVCS)INORTHBORIC ACID BLENDER        AUXILIARY        609.00    VOLUMECONTROL TANKE                          1.5 x Boundeg      Yes                          Yas QP-21 TO REACTOR COOUWT LE?DOWN VOI.VME                                      HALLWAY,IN MIDDLEW                            Spectrum vs.
CONTROL TANKSHUTOFF VALVE                                                    REGN OF Rhl ON THE 618 EL                  Rea5sdc Ma(fran PLATFORM                                    Centered Roor Re          S pac(ra 0  CVCS I REACTOR COOUWT PUMP SEAL WATER HEAT                                  SEAL WTR HEAT XGHGR RM.                      1.5 x Bounded      Yas EXCHANGER HF:11 SAFETY VALVE                                                8 FT EAST OF REACTOR                          Spectrum vs.
COOUWT PUMP SEAL                            Raa5sdc Ma(fran WATER HEAT EXCHANGER                        Cantered Fsxir 814IE-I I, 7 FT ABOVE THE                  Response Spectra FLR 0  GVCSI REACTOR COOUWT LETDOWN VOLUME              AUXILIARY                  VOLUME CONTROI. TANKE                        1$ x Boundeg                              Yes    Yes CONTROL TANKTK 10 To CHARGING PUMP 'A'HUTOFF                                HALLWAY,AT THE S END OF                      Spectnsn vs.
                                                                                                                                                                  ~
4 MOTOR OPERATED VALVE                                                      THE HALLWAY,ON THE W                        Raarrsdc Ma(san WALLS'BOVETHE FlR                            Centered Roor Re        Spectra 0  CVCS I REACTOR COOLANT LETDOWN VOLUME            AUXILIARY                  VOI.UME CONTROL TANKE                        1$ x CONTROL TANKTK-1 0 TO CHARGING PUMP '8'HUTOFF                                HALLWAY,tN THE MIDDLEOF                      Spectrum vs.
4 MOTOR OPERATEO VALVE                                                      THEWSIDEOF THE                              Raassdc Median HALLWAY.1'BOVE THE FLR                      Centered FSsor Re        S      a 1.WMO-721      0  ESWI WEST ESW SUPPt Y HEADER TO AS EMERG        AUXILIARY        587.00    AB EDG RM. S Pipe Tunnel,    591.00 Yes        Boundeg                                      Yas DIESEL HEAT EXCHANGER SHUTOFF VALVE                                                                                    Spectrum vs. SSE Ground Respcnse 1-WMO-723      0  ESWI EAST ESW SUPPLY HEADER TO AB EMERG          AUXIUARY        587.00    AB EDG RM, S P(pe Tunnel            Yes        Boundeg                Yas                  Yes DIESEL HEAT EXCHANGER SHUTOFF VALVE                                                                                    ,Spectrum vs. SSE Grrxed Response S
8      1-V(MO-725      0  ESWI EAST ESW SUPPLY HEADER TO CD EMERG                          587.00    AB EDG RM, S Pipe Tunnel. 2(7 591.00 Yas        Bound eg        Yes    Yes          Yes    Yas DIESEL HEAT EXCHANGER SHUTOFF VALVE                                          E OF THE HALLWAYDooley                    Spectrum vs. SSE ON THE N WAlL                              Ground Response 1.WMO-?27      0  ESWI WEST ESW SUPPLY HEADER TO CD EMERG          AVXIUARY        587.00    AB EDG RM. S Prpa TunneL 28  591.00 Yes        Bound eg        Yas    Yes                  Yes DIESEL HEAT EXCHANGER SHUTOFF VALVE                                          E OF THE HALLWAYDOOR.                      Spectrum vs. SSE ON THE N WAIL                              Ground Response S
Certification:
All the information contained on this Screening Verification Data Sheet (SYDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seisrnicatty adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
IZ('(6/9~                                                          it      5        q                    - 1> av"6 Print or Type Name                            Si nature                        Date                          Print or Type Name              I                                          Date
 
~ 1 Walkdown:          . 0f 11/8/93                                                            DC CO          .IT 1                                                                                      age3of5 SCREENING VERIFICATION DATA SHEET (SVDS)
Equp.lo                                                    Fkxx              Room or Rcw/Cossnn                                        Capacity vs.            Cap >        Anchor  Interact Eraser No.                                                      Elev.                                                                      Demand Basis            Dam arxlt      OK7      OIQ    OKI 124V49N      0  GCWI                                                                                                          1.5 x Oaundrty Spectnsn  vs.              Yes  NIA      Yos Reartsdc Median Centered  Roor R        8 31    7    12~%98      0  CGWI                            AVXIUARY          609 HALLWAY                                                  1.5 x Boundrtg Spectrum  vs.                              Yes Reattsdc Motftsn Centered Fker R        S      s ICMO410      0  COW I EAST CCWTO HEAT          AUXIUARY          HALLWAY,                                                    1.5 x Bourxtstg Spectrum vs.      Yos                    Yos    Yos EXCHANGER HE-1 5E CCW OUTLET                                                                                  Roarrsdc Mtxfian Centered Floor SHUTOFF VALVE                                                                                                        R        8 I%M~II      0  CCW/COW PUMPS SUCTION          AUXILIARY        HALLWAY,                                                    1$ x Boundstg Spectrum vs.        Yes          NIA      Yos CROSSTIE HEADER'A'18 MOTOR                                                                                    Rearrs6c Met%an Centered Rcor OPERATED SHUTOFF VALVE                                                                                              R          8 1CMO412      0  CCW/COW PUMPS DISCHARGE        AUXIUARY          HALLWAY,                                                    1h x Boundstg  Spectrum vs.      Yos CROSSTIE HEADER'A'18 MOTOR                                                                                    Rearrsdc Median Centered Rcor OPERATED SHUTOFF VALVE                                                                                              Ros    so S
                                                                                                                                                    ~
IAM~13      0  CCWI CCW PUMPS SUCTION                            HALLWAY,                                      609.00  N/A  1S x Bourxhng Spectrum vs.                                        Yes CROSSllE HEADER%'8 MOTOR                                                                                      Rearrsdc Median Centered Roor OPERATED SHUTOFF VALVE                                                                                              Ros        8 1CMO414      0  GGWI GGW PUMPS DISCHARGE                          HALLWAY,                                      609.00  N/A  1.5 x          Spocaum vs.                    NIA      Yos CROSSTIE HEADER 'A'8 MOTOR                                                                                    Rearrsdc Motfian Centered Roor OPERATED SHUTOFF VALVE                                                                                              Re 37    8    I%M~IS      0  CGWI CGWTO MISCELANEOUS        AUXIUARY          HALLWAY,                                      609.00  N/A  1.5 x Bourxttng Spectrum vs.                    NIA              Yes SERVICE HEADER'A'18 MOTOR                                                                                    Reassdc Mrxssn Cantered Fkor OPERATED SHUTOFF VALVE                                                                                              Re        S tCM~16      0  COW I CGW TO MISCELANEGUS                        HALLWAY,                                                    1.5 x Bountsng Spectrum vs.        Yos    Yos            Yes SERVICE HEADER 'F 16 MOTOR                                                                                    Reassdc Motsan Centered Fkor OPERATED SHUTOFF VALVE                                                                                              R          8 I%MD<19      0  CGW I EAST RHR HEAT            AUXIUARY          HALLWAY,                                                    1.5 x Bourx4ng Spectrum vs.                Yes            Yos    Yos EXCHANGER HE-1TE CCW OUTLET                                                                                  Rearrsdc Median Centered Fbor SHUTOFF VALVE                                                                                                        R          S    s 1<M0420      0  COW I WEST CGW TO HEAT          AUXIUARY          HALLWAY,                                      609.00  N/A  1.5 x Ouurxtrng Spectnsn vs.      Yes          NIA              Yes EXCHANGER HE-1 SW CCW OUTLET                                                                                  Rearrssc Motsan Centered Fker SHUTOFF VALVE                                                                                                        R          S 41    8    I+MD-211    0  AVXFEEDWATER/TURBINEDRIV        AUXILIARY  612.00 E MAN STEAM STOP ENCLOSURE, 20'        OF                    1.5 x Boundstg Spectrum vs.
AVXFEED PUMP PPQ DISCHARGE                        RMS ENTRANCE DOOR, 1'    OF A CEMENT                      Reassdc Motfian Centered Fbor To STEAM GENERATOR OMM-I 4                        COLUMN, 3'BOVE FLR.                                                Response Spectra NCH MOTOR OPERATED CONTROL VALVE I+MD-212    0  AVXFEEDWATER/WEST MOTOR        AUXILIARY  612.00 E MAINSTEAM STOP ENCLOSURE. 25' OF            633.00  N/A    18 x Boundrtg Spectrum vs.                Yes  NIA      Yes DRIVAUX FEEDWATER PUMP PP-                        RI/IS ENTRANCE DOOR, NEAR A CEMENT                          Rearrsdc Median Centered Fkxx 3W SUPPLY To STEAM                                COLUMN, 3'BOVE THE FLIL                                            Response Spectra GENERATOR OME4-I 4 INCH MOTOR OPERATED CONTROL VALVE I+MD-241      0  AUXFEEDWATER/TURBNE ORIV                  612.00  E MAN STEAM STOP ENCLOSURE. Ir S OF THE  633.00  N/A    1.5 x Banrbng Spectrum vs.                              Yes    Yos AVXFEED PUMP PPQ DISCHARGE                        RhfS ENTRANCE DOOR, 1'  OF A CEMENT                      Rearrsdc Median Centered Boor To STEAM GENERATOR OME~ 4                          COLUMN, 3'BOVE FLIL                                                Response Spectra INCH MOTOR OPERATED CONTROL VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
izlrchs Print or T pe Name                              i    ture                        Date                        Print or T pe Name                                Si nature                  Date
 
Walkdown:              of 11IN93                                                          DC CO          .IT 1                                                                                            'age4of5 SCREENING VERIFICATION DATA SHEET (SVDS)
Item  Eq. CI    Equip.to  Rev    System/Equtpmem Descr oxen                              Room of Rcv//column                                                                        Cap>>    Gaveats              Equip Na        No                                                                                                                                                      Dam and7  OK?    OK7          OK7 44      8    I+M&242      0  AVXFEEDWATERI WEST MOTOR      AUXILIARY 612.00 E MAINSTEAM STOP ENCLOSURE, 1Z S OF                          N/A    1.5 x Boundng S pact/um vs.                Yas  N/A            Yos DRIVAUX FEED PUMP PP4W                          THE RIIIS ENTRANCE DOOR, 3'ABOVE THE                                ROS5$ 5c  Median Centered Fkxx SUPPLY TO STEAM GENERATOR 3-                    FlR                                                                        Response Spectra 4 4 INCH MOTOR OPERATED CONTROL VALVE 45      8    14CM-250      0  BORON NJEGTION I BORON        AUXIUARY  612.00 BORON INJECTION TANKRM, IN THE CENTER                                1.5 x Bandng Spectrum va          Yos      Yos  NIA            YO$
NJECTION TANK A CONTAINMENT                    OF THE RM, O'ABOVE THE FLR                                          ROSLSBc  Median Centered Roor ISolATION VALVE                                                                                                            Response S      a 46      8    1 4CM-251    0  BORON INJECTION I BORON        AUXILIARY 612.00 BORON INJECTION TANKRM, N THE CENTER                          NIA    1.5 x Boundng Spect/um vs.        Yes      Yos                  Yes NJECTION TANK'8'ONTAINMENT                      OF THE RM, O'ABOVE THE FLR                                          Reassdc Median Centered Roor ISolATION VALVE                                                                                                            Re        S 47      8    1  ICMO11    0  RHR/EAST RHRTO REACTOR        AUXILIARY 609.00 E RHR HEAT EXCHANGER RM,    6'E OF E RHR            609.00  Yos    Boundng Spectrum vs. SSE          Yes      Yos
                                                                                                                                                    ~
COOLANT LOOPS 1 AND 4 HOT                      HEAT EXCHANGER, NEAR THE N    WALIB'BOVE Ground Response Spectnsn LEGS CONTAINMENTISOLATION 8                            THE GRATNG.
MOTOR OPERATED VALVE 48      8    14CM421      0  RHR I WEST RHR TO REACTOR                      W RHR HEAT EXCHANGER RM. 4' OF W RHR                  609.00                    Spactnsn vs. SSE COOLANT LOOPS 2 AND 3 HOT                      HEAT EXCHANGER, NEAR THE N WALL                                      Ground Response S pact/um LEGS CONTAINMENTISOLATION 8 MOTOR OPERATED VALVE
                                                                                                                                                            ~
49      8    14M0.255      0  BORON NJECTION I BORON        AUXIUARY  612.00 BORON NJ ECTION TANKRM. 3' OF BORON                          N/A    1h x Boundng Spectrum vs.                  Yos  M/A WJECTION TANK'A'LET                            INJECTION TANK, 4'ABOVE THE FLR                                    Rearrstic Median Centered Fker SHUTOFF VALVE                                                                                                              R        6 50      8    1 4M  0456    0  BORON NJECTION I BORON        AUXIUARY  612.00 BORON NJECTION TANKRhL 3' OF BORON                                  1.5 x          Specuum va        Yos      Yos  M/A            Yes INJECTIOM TANK'IrNLET                          INJECTION TANK1-TK-11, O'BOVE FLR                                  Realsdc Median Cantered Fker SHUTOFF VALVE                                                                                                              Response S      a 51      8    14NI0414      0 RHR I EAST RHR PUMP PP45E                      E RHR HEAT EXCHANGER RM, N THE MIDDLE                6IXI.OO        1.5 x Bandng    Spectrum vs.                Yas DISCHARGE CROSSTIE SHUTOFF 8                    OFTHESPARTOFRM, tg/SOFERHRHEAT                                      Realsdc Median  Centered Fkor MOTOR OPERATED VALVE                            EXCHANGER 1'BOVE GRATING.                                                  Res      S      a 52      8    I-IMM24        0 RHR I WEST RHR PUMP PP45W      AUXILIARY 609.00 W RHR HEAT EXCHANGER RM, W THE SE                                    1.5 x Bandng  Specuum  vs.                    NIA DISCHARGE CROSSTIE SHUTOFF 8                    PARTOF THERM,6'SOF WRHR HEAT                                        Realndc Ihxssn Centered  Roor MOTOR OPERATED VALVE                            EXCHANGER, 6'BOVE GRATING.                                                  Re        S 53      8      14MO440      0 RHR I EAST RHR HEAT                            E RHR HEAT EXCHANGER RM, IN THE MIDDLE                                1.5 x Boundng Specuum    vs.      Yes      Yos                  Yos EXCHANGER TO CHARGNG                            OFTHESPARTOFTHERM,7FTSOF ERHR                                      Rearrsdc Median Centered  Rcor PUMPS SUCTION SHUTOFF 8                        HE 8 14IE-17E, 1 FT ABOVE GRATNG.                                          Response Spectra MOTOR OPERATED VALVE 54      8    14uMO-210      0 MAN STEAM I STEAM STOP VALVE                    E MAN STEAM STOP ENCLOSURE,                3'E OF    633.00          I 4 x Bandng Spaarum vs.          Yas                          Yes MRV-210 STEAM CYUNDER DUMP 4                    STEAM STOP VALVE144RV-210, 2'BOVE THE                              Raalsuc Mac5sn Centered Roor MOTOR OPERATED VALVES                          640 EL PlATFORM.                                                            Response Spectra SELECTOR VALVE 55    8    14uM0-240        MAINSTEAM I STEAM STOP VALVE                  E MAN STEAM STOP ENCLOSURE, N THE N                                  14 x Boundng Spectrum vs.        Yes MRV-240 STEAM CYUNDER DUMP                    PART OF RM,  3'E  OF STEAM STOP VALVE1                            Rearudc Median Centered Floor VALVE4 MOTOR OPERATED                          MRV-240, ON THE 640 EL PLATFORLL                                            Response Spectra SELECTOR VALVE 14/rMO-        ESW/EAST CONTAINMENTSPRAY                      HALLWAY,                                                              1.5 x Boundng Spectnsn  vs.      YOS      Yos          Yos    Yes 713          HEAT EXCHANGER ESW OUTLET                                                                                          Realistic Median Centered Floor SHVTOFF VALVE                                                                                                              Response S 57    8      1-WMO-      0  ESW I WEST CONTAINMENTSPRAY                    HALLWAY,                                                            1.5 x Bcundng Spect/um  vS.      Yos      Yes                  Yos 717          HEAT EXCHANGER ESW OUTLET                                                                                          Roalsuc Merfran Centered  Fkor SHUTOFF VALVE                                                                                                              Response Spectra Certification:
Allthe information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" lndudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
1z    t                                                                                                          Z/rSI'~S.
Print or T pe Name                                ature                        Date                              Print or Type Name                                Si nature                  Date
 
Walkdown:          .. uf 11IN93                                                          DC CO          .r1                                                                                            3ge 5 of 5 SCREENING VERIFICATION DATA SHEET (SVDS)
Fkgr                                          Base                      Capacity vs.            Cap >            Anchor              Equip Iwn  Eq. CI  Equ'P.ID    Rev OK7                OK?
Nix      No                                            Ekiv.                                        Ekiv.                    Demand Basis            Demand7 1.V/MO-        ESW I EAST CCW HEAT                              HALLWAY,                                                1.5 x Bounding Spectrum vs.        Yes 731          EXCHANGER HE 15E ESW INLET 16                                                                            Reaks5c Merriman Centered Boor MOTOR OPERATED SHUTOFF                                                                                          Response Spectra VALVE AUXILIARY  609.00 HALLWAY,                                                1.5 x Bounding S pact/um vs.      Yes      Yes                Yes 59    8                  0  ESWI EAST CCWHEAT EXCHANGER HE 15E ESW OUTLET                                                                              ReaKstic Median Centered Boor SHUTOFF VALVE                                                                                                  Re      e Spectra 1.5 x BoundNg Spect/um va                                      Yes I-WMO-          ESW I WEST CCW HEAT          AUXILIARY  609.00 HALLWAY, EXCHANGER HE-15W ESW gILET 16                                                                            Rearisric Mtxrian Centered Boor 735 MOTOR OPERATED SHUTOFF                                                                                          Response Spectra VALVE 609.00 HALLWAY,                                          N/A    1.5 x Bounding Spectfufn vs.              Yes      N/A        Yes      Yes 61    8    I-V/MO-      0 ESW I WEST CCW HEAT          AUXILIARY 737          EXCHANGER HE-1 5W ESW OUTLET                                                                            Rearis5c Median Centered Fkor SHUTOFF VALVE                                                                                                    Response S      a Certification:
                                                                                                                                                      "Allinformation" includes each entry and conclusion Allthe information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate.
(whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT.
All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
S    a i  ture IvA        I? /9 Date 6                Pnntor T pe Name                                    Si nature iz ~'rahs Date Print or T pe Name
 
Walkdown          ., of July 15, 1991                                                    DC C          .(IT 1                                                                              .Page  1 of2 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl  Equp.lo    Rev                                            Fkxx              Room or Row/Cokmn                                                            Cap >  Caveats              E/3r4/
No.      No                                            Elev.                                                                                          Demand?  OK?                  OK?
14MOO12      0  RHR I EAST RHR HEAT                              E RHR HEAT EXCHANGER RM, IN THE SE PART            Y8$    Bound'ng Spectnm vs. SSE                Yes EXCHANGER HE-17E OUTLET MINI-                    OF RM,5FEETSEOF E RHRHE&#xb9;1+IE-1?E,B                        Grasxl Response Spectrum FLOW UNE SHUTOFF VAI.VE                          FEET AVOVETHE GRATNG 1.IMO422      0  RHR/WEST RHR HEAT              AUXILIARY        W RHR HEAT EXCHANGER RM, 3 FEET SE OF              Yes    Boundng Spectnm vs. SSE        Y8$    Yes          Y8$    Yes EXCHANGER HE-17W OUTLET MINI-                    WRHR HE &#xb9;14IE-17W5 FEET ABOVE                              Gnxnd Response Spectrum FLOW UNE SHUTOFF VALVE                          PLATFORM GRATING. NEAR THE E WALL 0  RHR I EAST RHR TO UPPER        AUXILIARY 609.00 E RHR HEAT EXCHANGER RM, 8 FT NE OF E                      Boundng Spectrum vs. SSE        Y8$            N/A CONTAINMENTSPRAY SHUTOFF 8                              &#xb9; RHR HE 1+lE-17E, NEAR ES WALI 3 FT                        Ground Respcnse Spectrum MOTOR OPERATED VALVE                            ABOVE THE 615 EL PLATFORM 14MOMI        0  RHR I WEST RHR TO UPPER        AUXILIARY 609.00 W RHR HEAT EXCHANGER RLL 5 FT NE OF                Yes    Boundng Spectnsn vs. SSE        Yes            N/A  Yes    Yes CONTAINMENTSPRAY SHUTOFF 8                                    &#xb9; THE W RHR HE 14IE 17W, NEAR E WALL                        Ground Response Spectnm MOTOR OPERATED VALVE 0  RHR I WEST RHR HEAT            AUXILIARY 609.00 W RHR HEAT EXCHANGER RM, IN THE NE                        Boundng Spectnm vs. SSE                              Yes    Yes EXCHANGER OUTLET TO SAFElY                      PART OF THE RM, 2 FT NW OF W RHR HE &#xb9; 1-                  Ground Response Specbum INJECTION PUMP SUCTION                          HE-17W, NEAR THE W WALL SHUTOFF 8 MOTOR OPERATED VALVE 18    1-IFI435    0  RHR I RHR TO REACTOR COOLANT    AUXIUARY  591.00 VESTIBULFSFT S OF VESTIBULE DOORWAY.        591.00        Boundng Spectnsn vs. SSE                      Yes  Yes LOOPS 2 AND 3 COLO LEGS FLOW                    ON N WALL                                                  Ground Response Spectrum INDICATINGTRANSMllTER 19                  0  RHR I RHR TO REACTOR COOLANT                    E RHR HEAT EXCHANGER RM, IN NE PART OF                    Boundng Spectrum vs. SSE                      NIA  Yes    Yes LOOP 2 AND 3 COLD LEGS TEMP                      THE RM, SFT NE OF E RHR HE &#xb9;1-HE-17E, SFT                  Ground Rsspcnss Spectrum RECORDERTHERMALSENSOR                            BELOW THE 615 EL PlATFORM 0  I REACTOR PROTECTION TRAIN A  AUXIUARY  633.00 CONTROL RM, REAR SIDE OF MAIN FEED                        Boundng Specuum vs. SSE        Yes    Yes    Yes  Yes    Yss AUX RELAY CABINET&#xb9;2                                                    &#xb9; PUMPS CONTROL PANEL 14P. N OF 250 VDC                      Ground Response Spectrum
                                                                                                          &#xb9; VALVEDISTR U BUIl ON PANEL 1-VDAB-2 1~8.2        0  I REACTOR PROTECTION TRAIN 8  AUXILIARY 633.00 CONTROL RM, MIDDLE S REGN OF THE RM,                Yes  Boundng 5 pectnsn vs. SSE      Y8$    Yss    Yes          Yes AUXIUARYRELAY CABNET&#xb9;2                          ON THE REAR SIDE OF RADIATION                              Ground Response Spectrum MONITORING SYSTEM RACK I PANEL 14LMSJ 10              1-BA      0  I BORIC ACID CHARGNG tt        AUXILIARY 633.00 CONTROL RM, NW PART OF THE RM, 15 FEET                    Boundng Spectrum vs. SSE                                      No LETDOWN CONTROL PANEL                            NW OF THE UNIT SUPEIMSORS DESK                            Ground R          Spectnm 0  I CONTAINMENTAUXIUARIES        AUXILIARY 633.00 HALLWAY,N END OF THE HALLWAY,115 FEET                      1.5 x Bouncing Spectnm vs.              Yss  'es    Yss SUBPANEL LVENTILATION)                          SW OF THE AUXtLIARYBUILDINGVENTILATION                    R8$ 5$ 5c Median Centered Fker EXAUST UNITS.                                                    Re        S      a 12            1&R-I      0  I GENERATOR PANEL REAR        AUXILIARY 633.00 CONTROL R//L IN THE SE REGN OF THE RM,                    Bandng Spectrum vs. SSE                Y8$
NSTRUMENT/RELAYRACK &#xb9;1                          ON REAR SIDE OF MAN GENERATOR                              Ground Response Spectrum CONTROL PANEL  &#xb9; I&
13            14LHR      0  I RESIDUAL HEAT REMOVAL                        CONTROL RM, 14 FEET NWOF THE UNIT                    Yes  Bandng Spectrum vs. SSE CONTROL PANEL                                    SUPERVISORS DESK                                          Ground R          S 14            14LPSA      0  I REACTOR PROTECTION AND      AUXIUARY  633.00 CONTROL RM, N THE NE CORNOR OF THE                  Yes  Boundng Spectrum vs. SSE        Yes                  No SAFEGUARD ACTUATIONTRAN    A                    RI/L N FRONT OF THE CONTROL RM E REAR                      Grand Response S pectnsn RACK 15    20    14'8        0  I REACTOR PROTECTION ANO                        CONTROL RM, IN THE MIDDLE S REGN OF THE                    Boundng Spec/nm vs. SSE                              Yss SAFEGUARD ACTUAlloNTRAN 8                        RM, ON THE REAR SIDE OF MOVABLEINCORE                      Grand Response Spectnm CABINET                                          INSTRUMENTATIONPANEL &#xb9;WhFX 16                        0  I SAP EFIY NJECTION CONTROL    AUXILIARY 633.00 CONTROL RM, NW PART OF THE RM, 13 FT W                    Boundng Spectnm vs. SSE                        Yes          Yes PANEL                                            OF THE UNIT SUPERVISOR'S DESK                              Ground Rss        Spectnm 17              1<PY      0  I CONTANMENTSPRAY CONTROL      AUXIUARY  633.00 CONTROL RM, NW PART OF THE RM 14 FEET                      Bourxlng Spectnm vs. SSE                      Yes          Yes PANEL                                          SW OF UNIT SUUPERVISORS DESK                              Grand Re          Spectrum Certification:
Allthe information contained on this Screening Verificagon Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
IZ Iitotcsg Print or Type Name                              S nature                        Date                      Print or Type Name                                nature                  at
 
  "l Ci
 
Walkdown: V            f July 18, 1992                                                        DC C            nit 1                                                                        /
Page 6 of 10 SCREENING VERiFICATION DATA SHEET (SVDS)
Eq Cl    Equip. ID    Rov              System/EquSrment Descrqtron                        Floor Earv.      Room or Row/Co4mn        Base Elev.                              Cavoats              Equip No                                                                                                                                                      OK?      OK?        OK?
5'I    8    1-IMO416        0  RHR/EAST RHR AND NORTH SAFElY INJECTION To      CONTAINMENT    612.00    E CONT LOWER VENT RM, S          612.00    Yes Boundng Spectnrm          Yes Yos                        Yes REACTOR COOLAMT LOOPS 1 AND 4 COLO LEGS                                    FROM CONT LOWER                                vs. SSE Grand SHUTOFF 8 MOTOR OPERATED VALVE                                            COMPARTMENT &#xb9;4                                    Response VENTILATIONUNIT 141V4'LV-                          Spectrum 4, 4'ROM COLUMN 7. 5 ABOVE FLR 8    1 -9/IO425      0  RHR I WEST RHR AND SOUTH SAFElY INJECTION TO    CONTAINMENT    612.00    W CONT LOWER VENT RM.            612.00    Yes Boundng Spectrum    Yes    Yes    NIA        Yes REACTOR COOLANT LOOPS 2 AND 3 HOT LEGS                                    NEAR THE CRANEWALLSIDF                          vs. SSE Ground SHUTOFF VALVE                                                              OF WALKWAY,5 FEET FROM                              Response
                                                                                                                  &#xb9; COL 21, 3FT. FROM CONT.                            Spectrum LOWER VENT UNIT 14tv4'LV
: 3. 5 FT. ABOVE FLR 8    14MO426        0  RHRI WEST RHR AND SOUTH SAFETY INJECTION To      CONTAINMENT    612.00    W CONT LOWER VENT RM,            612.00        Boundng Spect/um    Yos    Yes REACTOR COOLANT LOOPS 2 AND 3 COLD LEGS                                    NEAR THE CONT WALLSIDE                          vs. SSE Ground SHUTOFF 8 MOTOR OPERATED VALVE                                            OF THE WALKWAY,5'ROM                                Response COLUMN 21, 3'ROM CONT                              Speci/um LOWER VENTILATIONUNIT 1 ~
HV4:LV4. 5 ABOVE FLR.
1-IMO41        0                    I BORON INJECTION BORON INJECTION TO REACTOR      CONTAINMENT              ANNULUS QUADRANT 1,                        Yos Boundng Spectrum    Yos                        Yes COOLANT LOOP 1 SHUTOFF 1.5 MOTOR OPERATED                                  AZ:050, OM THE CRANEWALL                        vs. SSE Ground VALVE                                                                      SIDE OF THE WALKWAY.                                Response COLUMN 2, 4'BOVE 10'ROM Spectrum THE FLR 8      1-IMO42        0  BORON NJECTION I BORON INJECTION TO REACTOR      CONTAINMENT              ANNULUS QUAD 2. AZ:119. ON                Yes Boundng Speci/um                  NIA        Yes COOLANT LOOP 2 SHUTOFF 1.5 MOTOR OPERATED                                  THE CRANEWALLSIDE OF                            vs. SSE Ground VALVE                                                                      THE WALKWAY.117 FROM                                Response COLUMN 23. 4'BOVE FLR.
1.IMO43        0  BORON NJECTION I BORON INJECTION TO REACTOR      CONTAINMENT              ANNULUS QUAD 3, AZ:200, ON                Yes Boundng Spectrum    Yos            N/A Yes    Yes COOLANT LOOP 3 SHUTOFF 1.5 MOTOR OPERATED                                  THE CRANEWALLSIDE OF                            vs. SSE Ground VALVE                                                                      THE WALKWAY,NEAR                                    Response COLUMN 19. 5'BOVE FLR.                              S 57    8      1~ IMO44      0  BORON NJECTION I BORON INJECTION To REACTOR      CONTAINMENT    598.00    ANNULUS QUADRANT4,                            Boundng Spectrum    Yos                        Yos COOLANT LOOP 4 SHUTOFF 1.5 MOTOR OPERATED                                  AZ325, ON THE CRANEWALL                        vs. SSE Ground VALVE                                                                      SIDE OF THE WALKWAY,                                Response COLUMN 4, 5'BOVE                          speci/um 10'BOVE FLR 8    1&MD-151        0  PRESSURIZER/PRESSURIZER RELIEF VALVENRV-151      CONTAINMENT              PRESSURIZER ENCLOSURE                      NIA  MOV4lERS vs.                      N/A UPSTREAM 3 MOTOR OPERATED SHUTOFF VALVE                                    NTERIOR. OM THE 6(6 EL                        Amp8ied Rear>>tic PLATFORM 3'BOVE                                Merrran Centered GRATING                                        Floor Response Spectra 59    8    1&MD-152        0  PRESSURIZER I PRESSURIZER RELIEF VALVENRV-152    CONTAINMENT              PRESSURIZER ENCLOSURE                      NIA  MOV4IERS vs.                                  No UPSTREAM 3 MOTOR OPERATED SHUTOFF VALVE                                    INTERIOR, ON THE 686 EL                        Amphfied ROS5stic PLATFORM. 3'BOVE                                Merian Centered GRATING                                        Floor Respor>>e S
8    1-NMO-1 53      0  PRESSURIZER/PRESSURIZER RELIEF VALVENRV-1533    CONTAINMENT      650.00  PRESSURIZER ENCLOSURE                          MOVERS vs.          No            NIA MOTOR OPERATED UPSTREAM SHUTOFF VALVE                                      INTERIOR, ON THE 686 EL                        Amph/red ROOMC PLATFORM. NEAR THE                              Mefian Centered ACCESS lADDER 3'BOVE                            Floor Response GRATING                                              S      a Certification All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or Type Name                                    i    ture                  ate                        Print or T pe Name                                nature                D te
 
Waikdown: V            f July 18, 1992                                                      DC C          nit1                                                                                  Page7of10 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq CI    Equp. ID    Rev                                                                Fker Elev. Room or Rowtcohsnn      Base Elav. <40?    Capacity vs. Cap>  Cavaats  Anchor  Interact Equip No                                                                                                                          Demand Basis    Occur?  OK?      OK?      OK?    OK?
61    8    1&SO61        0  REACTOR COOUWT SYSTI PRESSURIZER OMEP POST      CONTANMENT      6$ 0.00  PRESSURIZER ENCLOSURE                        Test Data vs. No    Yes              Yos    No ACCIDENT VENT 'A'OLENOID VALVE                                            INTERIOR, IN THE PRZ                        Amphfied Rear>>tic ENCLOSURE. ON THE 679 EL                    Median Cantered PLATFORM                                    Boor Response Spectra 8    1&5(Wi2        0  REACTOR COOUWT SYST I PRESSURIZER OMEN POST-    CONTAINMENT    6$ 0.00  PRESSURIZER ENCLOSURE                        Tost Data vs. No              NIA      Yos    No ACCIDENT VENT 'A'OLENOIDVALVE                                            IMTERIOR, IN THE PRZ                        Arnphf>>d Rear>>dc ENCLOSURF OM THE 679 EL                      Median Cantered PLATFORM                                    Boor Respor>>o Spectra 8    1&SO4i3        0  REACTOR COOUWT SYST I PRESSURIZER OMEN POST-    CONTAINMENT    650.00  PRESSURIZERENCLOSVRE                          Test Data vs.          Yes              Yos    No Acc IDENT VENT 'F SOLENOID VALVE                                          INTERIOR, IN THE PRZ                        Amplf>>d Rearsdc ENCLOSURE, ON THE 679 EL                    Median Centered PLATFORM                                    Floor Response Spectra 8    1&8044        0  REACTOR COOLANT SYST I PRESSURIZER OMEN POST-  CONTAINMENT    650.00  PRESSURIZER ENCLOSURE                        Test Data vs.            Yes              Yes    No ACCIDENT VEM 'F SOLENOID VALVE                                            INTERIOR. IM THE PRZ                        Amplif>>d Rear>>tie ENCLOSURE. ON THE 679 EL                    M<<f>>n Centered PLATFORM                                    Floor Response S
8    147CM-2$ 0      0  REACTOR COOLIWT PUMP IRCP SEAT WATER RETURN    CONTAINMENT    598.00  ANNULUS QUAD 2, AZ 149, ON  598.00    Yes Boundeg Spectrum  Yes    Yes                      Yes
                                'A'ONTAINMENTISOLATION 4 MOTOR OPERATED                                  THE CRANEWALLSIDE OF                        vs. SSE Ground VALVE                                                                    THE WALKWAY,10' ROM                              Response COLUMN <<23. 4'BOVE FLR                          S 8    1-XSO405      0  CONTROL AIR I PRESSURIZER TRAIN 8 PRESSURE      CONTAINMENT    650.00  PRESSVRIZERENCLOSURE                        MOVERS vs.        YOS            N/A      Yos    Yes RELIEF VALVENRV-1 52 CONTROL SOLENOID                                    INTERIOR. IN THE                            Amphfied Reahssc PRESSURIZERENCLOSURE,                        Median Cantered AT THE 686 EL PlATFORM.                      Fker Response 67    8    1.XSO407        0  CONTROL AIR I PRESSURIZER TR A PRESSURE RELIEF  CONTAINMENT    650.00  PRESSURIZERENCLOSURE                        MOVERS vs.        Yes            NIA      Yes    Yes VALVENRV.153 CONTROL SOLENOID                                            INTERIOR, IN THE                            Amphf>>d Reahsdc PRESSURIZERENCLOSURE.                        M<<f>>n Cantered AT THE 686 EL PLATFORM.                      Fker Response Spectra 9    14IV<EQ-1      0  HYDROGEN SIQMMERI CONTAINMENTHYDROGEN          CONTAINMENT    625.00  HV<EQ-1 FAN RM. CEQ FANS    625.00    Yes Boundeg Specuum            Yos              Yas    Yes S IQMMER VEMTItATIONFAN 1                                                ARE NEEDEO FOR                              vs. SSE Ground ACCIDENTS AND WILLNOT                            Response BE ACTIVATEDDUE TO                              Spectrum SEISMIC EVENT. FOR ANCHORAGE ONI.Y.
69    9    14tVNEQ-2      0  HYDROGEN SIQMMER I CONTAINMENTHYDROGEN          CONTAINMENT    625.00  Hv<EQ.2 FAN RM. CEQ FANS                    Boundeg Spectrum          Yes                      Yes SIQMMER VENTilATIONFAN 2                                                ARE NEEDED FOR                              vs. SSE Ground ACCIDENTS AND WILLNOT                            Response BE ACTIVATEDDUE TO A                            Spectrum SEISMIC EVENT. FOR ANCHORAGE ONLY.
70    18    1+U  1 10    0  STEAM GENERATWG I STEAM GENERATOR OMEW1        CONTAINMENT    614.00  ANNULUS, QD <<1. AZ:020. ON  625.00    Yes Boundeg Spectrum  Yes                      Yas    Yos WIDE RANGE LEVEL INDICATORTRANSMGTER                                    THE COMT WALLSIDE OF THE                    vs. SSE Ground WALKWAY.NEAR COLUMN                              Response
                                                                                                          <<R                                              S Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or Type Name                                  i  ature                      te                      Print or Type Name                              ature                      Date
 
Walkdown: V              f July 18, 1992                                                        DC C        Jnit1                                                                              Page 8 of 10 SCREENING VERIFICA        N DATA SHEET (SVDS)
Eq. Cl    Equp. ID      Rev                                                                                  Room or Row/Cohrnn                    Capacay vs.          Caveats Anchor Gapa                          Equp No                                                                                                                        Demand Basis    Darnd?  OK7    OK?            OK'?
71    18    14LI.120        0  STEAM GENFRATING I STEAM GENERATOR OME4 2        CONTAINMENT    614.00 ANNULUS, QD $2, AZ:130, ON            Yes Boundng Spectrum  Yes    Yes            Yes WIDE RANGE LEVEL TRANSMITTER                                              THE CRANEWALLSIDE OF                      vs. SSE Ground THE WALKWAY.                                  Response Spectrum 72    18    1+LI-130        0  STEAM GENERATING I STEAM GENERATOR OME44          CONTAINMENT    614.00 ANNULUS, QD &#xb9;3, AZ:190, ON    625.00 Yes Bandng Spectrum    Yes    Yes    Yes    Yes    Yes WIDE RANGE LEVEL INDICATORTRANSMITTER                                    THE CRANEWALLSIDE OF                      vs. SSE Ground THE WALKWAY,ACROSS                            Respor>>e FROM COLUMN &#xb9;20.                              S 73    18    1-BLI-140        0  STEAM GENERATING I STEAM GENERATOR OME44          CONTAINMENT    614.00 ANNULUS, QD &#xb9;4, AZ:334, ON            Yes Boundng Spectrum  Yos                    Yes WIDE RANGE LEVEL INDICATORTRANNSMI1TER                                    THE CONT WALLSIDE OF THE                  vs. SSE Ground WALKWAY,NEAR COLUMN                          Respor>>e
                                                                                                            &#xb9;8.                                            S 74    18      1-IFI41        0  BORON INJECTION/ BORON INJECTION TO REACTOR      CONTAINMENT    598.00 ANNULUS, QD&#xb9;l, AL050, ON      598.00 Yes Boundng Spectrum  Yes            Yes    Yes    Yes COOLANT LOOP &#xb9;1 FLOW INDICATORTRANSMITTER                                THE CRANEWALLSIDE OF                      vs. SSE Ground THE WALKWAY.ACROSS                            Response FROM COLUMN 2, tr ABOVE                      Spectrum FUL INST DWG 145708, 1-5571.
75    18      1-IF l42        0                  I BORON INJECTION BORON INJECTION TO RC LOOP  &#xb9;2  CONTAINMENT            ANNULUS, QD&#xb9;2, A?155, ON              Yes Boundng Spectrum  Yes FLOW INDICATORTRANSMITTER                                                THE CRANEWALLSIDE OF                      vs. SSE Ground THE WALKWAY.INST DWG 1-                      Response 55?DC. 14571A                                  S 18      14FI43          0  BORON INJECTION I BORON INJEGTION To RC LOOP &#xb9;3  CONTAINMENT    598.00 ANNULUS, QD&#xb9;3, AL213, ON      598.00 Yes Boundng Spectrum  Yos    Yes    Yes            Yes FLOW INDICATORTRANSMITTER                                                THE CRANEWALLSIDE OF                      vs. SSE Ground THE WALKWAY,NEAR                              Response COLUMN 18. INST DWG 1-                        Spectrum 5570D. 14571 B.
77    18      14F I44        0  BORON INJEGTIONI BORON INJECTION TQ RC LOOP &#xb9;4    CONTAINMENT    598.00 ANNULUS, Q 0 &#xb9;4, AZ:337. ON    598.00 Yes Boundng Spectnsn  Yes    Yos    Yes    Yes    Yes FLOW INDICATORTRANSMITTER                                                THE CONT WALLSIDE OF                      vs. SSE Ground WALKWAY,NEAR COLUMN 8.                        Response INST DWG 145?DE. 14571C.                      S 78    18    1-NLI-151        0  PRESSURIZER I PRESSURIZER LEVELINDICATOR          CONTAINMENT    612.00  INSTRUMENTATIONRM,      5'W  612.00 Yes Boundng Spectrum                          Yos    Yos TRANSMITTER                                                              OF THE 612 AIRLOCKDOOR:                  vs. SSE Ground ON THE CRANEWALI INSIDE                      Response A PROTECTED Bo)L INST                          Spectrum DWG 145818, 14581. 1-5581A. 1 4531 B 79    18    14(LP-1 51        0  PRESSURIZER r PRESSURIZER (OME<) LEVEL            CONTAINMENT    612.00  INSTRUMENTATIONRM,      4'W  612.00 Yes Boundng Spectnsn  Yes            Yes    Yas    Yos TRANSMITTER                                                              OF THE 612 AIRLOCKDOOR,                    vs. SSE Ground ONTHEWWALL                                    Respor>>e S
18    1+LP-152        0  pREssURlzER I pREssvntzER (DME<) LEYEL            CONTAINMENT    612.00  INSTRUMENTATIONRM, ON        612.00 Yes Boundng Spectrum  Yes            Yes    Yes TRANSMllTER                                                              THE CONT. WALI O'WOF                      vs. SSE Ground
                                                                                                                  &#xb9; COL 13 NEAR ANNULUS                          Respa>>e HATCH                                        S 81    18    1&LP-153        0  PRESSURIZER I PRESSURIZER (OME<) LEVEL            CONTAINMENT    612.00  INSTRUMENTATIONRM, ON        612.00 Yes Boundng Spactnsn  Yes            Yes            Yas TRANSMITTER                                                              THE CRANEWAU NEAR THE                      vs. SSE Ground FOOT OF THE SEAL TABLE                      Response STAIRS                                        S Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
I' Print or Type Name                                  S    a  re                      Date                      Print or T pe Name                        Si ature                    Date
 
Walkdown.. of 10/18/93                                                                      DC C    ..IIT1                                                                                      Page 1 of4 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl  Eqrap.lo Rev    a?stem/Equipment Desciiptron    8uadng. Fkxx              Room or Row/Graumn                  Base                  Capacsy vs.            Cap >  Caveat$            Equip Na    No                                                Eiov.                                                Etov.                Demand Basis            Demand?  OK?    OK?        OK?
14IV4GR-    0  AVXBUILDINGVENTILAICONTROL          AUXILIARY 609.00 4KVRM.600VSWGRArea,tNSWCORNEROF                        Yos    Bounding Spectrum vs. SSE                          Yes    Yes MD-1      ROD DRIVE EQUIP ROOM AND                            RM, SWOF 11ASWGR, 1t7 ABOVE FLR, ON                          Grrxnd Response Speci/um INVERTER AREA VENTILATION                            SIDE OF INLET DUCT. WAlKDOWNNOTE: IEEE RECIRCULATING AIR INLET                              344-75 ANALYSISAVAIL DAMPER 14IV4GR-    0  AVXBUILDINGVENTIIAICONTROL          AUXILIARY 609.00 4KVRM.600VSWGRArea,tNSWCORNEROF                        Yes    Boundng Spectrum vs. SSE        Yes    Yes              Yes MD-2      ROD DRIVE EQUIP ROOM AND                            RM. SW OF SWGR. MNTD IN CEIUNG. NOT                          Ground Response Spectnm INVERTER AREA VENTILATION                            VISIBLEW/0 ENTEIVMGACCESS DOOR NOTE RECIRCUtATING AIR INLET                              FOR WAlKDOWH:IEEE 344-75 ANALYSIS DAMPER                                              AVAIL 14V45    0  CCWI LETDOWN HEAT                  AUXILIARY 633.00 633 HAlLWAY.20 FT. NORtH OF THE FREIGHT                Yos    Bourx4ng Spectrum vs. SSE                          Yes EXCHANGER HE-14 CCW OUTLET                          ELEVATOR 12 FT. ABOVE FLOOR.                                Gnwxl Response Spect/um SAFHY VALVE 14V-94N    0  GIRL RM AIR CONDITIO I CONTROL      AUXILIARY 650.00 CTRL RM AIR COND RM, IM THE NW CORNER                        1.5 x Boundng Spectrum vs.        Yos    Yes        Yes    Yes ROOM AIR CONDmONING NORTH                            OF THE RM, 1 FT WEST OF NORTH CONTROL                      Rearrs5c Median Centered Fker CHILLWATER EXPANSION TANK                            RM AIR CONDmoNING NORTH CHILLWATER                                Response Spectra TK-76N SAFElY VALVE                                  EXPANSION I 4V44S    0  CTRL RM AIR CONDITIO I CONTROL      AUXILIARY 650.00 CTRL RM AIR COND RM, AT THE WEST F ND OF                    1.5 x Boundng Spectrum vs.                      N/A ROOM AIR CONDITIONING SOUTH                          CONTROL RM AIR CONDITIONINGSOUTH                            Reassdc Merssn Centered Fbor CHILLWATER EXPANSION TANK                            LIQUIDCHILLER &#xb9;144VVCRO, NEAR THE SO.                              Response Spectra TK-76S SAFETY VALVE                                  WALL8 FT 1  VRV415  0  CTRL RM A/C CHILLWA I CONTROL      AUXILIARY 650.00 CONTROL ROOM A/C ROOM. 3 FEET WEST OF                        1.5 x Boundstg Speci/um vs.      Yes    Yes              Yes ROOM VENTltATIOMUNIT HV                              CONTROL ROOM AtR HANDUNG SVBPANEL                          Rearrsdc Median Centered Boor ACRA-1 CHILLWATER 2 1/2. 3-WAY                      &#xb9;t&CRA-I,NEAR THE NORTH WALL,2 FEET                                Response Spectra AIR OPERATED CONTROL VALVE                          ABOVE THE FLOOR 1-VRV425    0  CTRL RM A/C CHILLWA I CONTROL      AUXltARY  650.00 CONTROL ROOM AC ROOM, IN MIDDLE                              1.5 x Sounchrg Spoor/urn vs.              Yes  NIA  Yos    Yes ROOM VENTILATIONUNIT HV                              SOUTH REGION OF THE ROOM. 10 FEET EAST                      Rearrssc Median Centered Fker ACRA4 CHILLWATER 2 1/2 3.WAY                        OF CONTROL ROOM AIR CONDmONING                                    Response Spoor/a AIR OPERATED CONTROL VALVE                          SOUTH LIQUID CHILLER&#xb9;14IVACR-2, NEAR THE SOUTH WALL,2 FEET ABOVE THE FLOOR 14IV4IGS    0  DIESEL ROOM VENTILATIAB            AUXILIARY 59L00  REACTOR CABLE TUNNEt QUAD. NO. 3, IN                        Boundng Spectrum vs. SSE                  Yos        YOS    Yes DAB        EMERGENCY DIESEL GENERATOR                          MIDDLEOF SW REGN OF THE RM 15 FEET S                        Grand Response Spectrum ROOM VENTILATIONSVPPlY FAH                          OF THE ACCESS DOOR FROM THE DIESEL HV4IGS-1 OUTSIDE AIR SHUTOFF                        HALLWAY,8 FEET ABOVE THE FLR DAMPER 14IV4IGS-  0  DIESEL ROOM VENTitATI CD            AUXILIARY 586.00 STORAGE TANKPIPE TUNNEl INNWAREAOF                          Boundng Spectrum vs. SSE          Yes    Yes              Yes DCD        EMERGENCY DIESEL GENERATOR                          PIPE TUNNEINEARlADDER TO THE RWST                          Ground Response Spectrum ROOM VENTILATIONSUPPLY FAH                          VALVEHOUSE, 2'ROM THE E WALI HV4X>9-2 OUTSIDE AIR SHUTOFF                                THE 593 EL PLATFORM.      10'BOVE DAMPER 10          1-HV4GR. 0  AUXILIARYBUILDINGV/4KVROOM          AUXILIARY 609.00 4KV RM,600V SWGR Area. INNWREGN OF                            Boundng Spectrum vs. SSE        Yes    Yes  N/A MD4        600V SWITCHGEAR                                      THE RM. ON600V SWGRTRANSFORMERS                              Grand Response Spectrum TRANSFORMERS TR11A 8 TR11C                                                          &#xb9; AREA VENTILATIONSUPPLY FAN 140f-AREA VENT SUPPLY FAN HV4GRS-                        SGRS4 8 SUCTION DAMPER Certification:
All the information contained on this Screening VeriTication Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                              Si nature                        Date                        Print or T pe Name                              Si nature
 
J ~~
Walkdown:            uf 10/18/93                                                                    DC C            .IT1                                                                              .'age 2 of 4 SCREENING VERIFICA              N DATA SHEET (SVDS)
Eq. CI  Equip.lo            System/Ersspment Deccriipticn                    Fker              Roan or Row/Coksnn No.
Capacity vs.          Cap >  Caveats            Equip Ekrv.                                                                    Demand Basis          Demaxl?  OK?                OK?
11    8    14V4GR-      0  AUXILIARYBUILDWG V I 4KV ROOM                              4KV RM. 600V SWOR Area, IN NE REGN OF THE  609.00        Boundeg Spectrum vs. SSE M04                                                                                                                                                                                            Yes 600V SWITCHGEAR                                            RM, ON 600V SWGR TRANSFORMERS AREA                        Ground Response Spectrum TRANSFORMERS AREA                                                                  &#xb9; VENTllATIONSUPPLY FAN 140/4GRS-7 VENTILATIONSUPPLY FAN HV-SGRS-7 SUCTION DAMPER 12    8    140/4GR      0  AUXIUARYBUILDINGV/600VAC                            613.00 4KV RM, Mezzanee Area, W MiDDLES. REGN      633.00  Yes    Boundeg Spectrum vs. SSE        Yes                Yes    Yes MD4            MOTOR CONTROL CENTER                                      OF THE RM, AT S END OF 600VAC MOTOR                        Ground Response Spectrum MEZZANINEAREA VENTILATION                                  CONTROL CENTER MEZZ. AREA VENT.
SUPPLY FAN HV4GRS4 VENT                                    SUPPLY FAN 1+IV4GRS4, 10'BOVE THE FLR DAMPER 13    9    140/utEB-    0  AUX BUILDWGVENTIIA/AVX                    AUXILIARY        NORMAL BLOWDOWN FLASHTANKRM. W THE          633.00  N/A  1.5 x Bounding speci/um vs.      Yes          Yes  Yos 1          BuiLDING VENTILATION                                      SW REGN OF THE RM, 20'E OF SG NORMAL                    Roaristic M<<fian Centered Fker ENGWEERED SAFETY FEATURE                                  BD FlASH TK&#xb9; 1-TK-99, NEAR THE S WALL                            Response Spectra EXHAUST UNIT 1 14    9    140/Ms-          AVXBUILDWGVENTILAIAUX                    AUXILIARY        NORMAL SLOWDOWN FLASHTANKRM, IN THE        650.00  N/A  1.5 x Bounding Spectrum vs.      Yes    Yes  Yes  Yes    Yes 2            BUILDINGVENTllATION                                        SWREGN OF THE RM, 20'WOF SGBD                            Rearstic M<<fian Centered Fker ENGWEERED SAFElY FEATURE                                  FlASHTANK&#xb9;1-TK49, NEAR THE S WALL                                Response Spectra EXHAUST UNIT 2 15    9    140/4FP BRE-1 0  AUX BUILDWGVENTILA  I'tr                                  HALLWAY.ON THE N WAtLOF THE N-TRAIN                      1.5 x Bounding Spectrum vs.      Yos    Yes  Yes  Yes    Yos BATTERY ROOM EAST EXHAUST                                  BATTERY RM, S FROM E WALI 4'ABOVE THE                    Rearistic Median Centered Fker FAN                                                        FLR.                                                            Re        S    a 16    9    tkvutFp-        AVXBUILDING VENTIIAI TR.                                  HALLWAY,ON THE N WALLOF THE N TRAIN                      1.5 x Bounding Spectrum vs.      Yes    Yes  Yes  Yos    Yes BRE-2                    ROOM WEST EXHAUST                                BATTERY RM. 4'BOVE THE FLIL
                                                          'N'ATTERY Rearsdc Median Centered Fhor FAN                                                                                                                        Re              a S
'll    9    140/4FP-    0  TURBWE BUILDWGVEN I EAST                            591.00 E MOTOR DRIVAUXFDWTRPUMP RM, IN THE        591 00  Yes  Boundsig Spectnsn vs. SSE        Yes    Yes  Yes  Yes    Yes Ml            MOTOR DRIVAUX FEEDWATER                                    SW CORNER OF THE RM, 10'W OF E                            Ground Response Spectrum PUMP ROOM EXHAUST FAN                                      MDAFV/P, ON THE W WALI12'BOVElHE FLR.
18    9    14V4FP      0  TURBWE BUILDINGYEN I EAST                  TURBINE  591.00 E MOTOR DRIV AUX FDWI'R PUMP RM. IN THE    59100  Yes  Boundstg Spectnsn vs. SSE                Yes    Yes M2            MOTOR DRIVAVXFEED WATER                                    NE CORNER OF THE RM, 8' OF THE RIES                      Ground Response Spectrum PUMP ROOM SUPPLY FAN                                      ENTRANCE DOOR, ON THE N WAll 12'ABOVE THE FUL 19    9    14V4FP-          TURB WE BUILDINGVEN I TURB                TURBINE  591.00 TURB DRIVAUXFDWTR PUMP RM. IN THE SW        591.00  Yes  Boundeg Spectrum vs. SSE                  Yes  Yes  Yos    Yes T1            DRIVAUX FEED PUMP ROOM                                    REGN OF THE RM, O' OF AFP TURBINFON                      Ground Response Spectrum SOUTH EXHAUST FAM                                          THE W WALL12'BOVE THE FLIL 140/utF P-  0  TURBWE BUILDINGYEN I TURBINE              TURBINE  591.00 TURB DRIVAUX FDWTR PUMP RM, IN THE NW      591.00  Yes  Boundeg Specuum vs. SSE          Yes    Yos  Yes  Yos T2            DRIVAUX F EED PUMP ROOM                                    CORNER OF THE RM, ON THE W WALLS NW                      Ground Response Spretrum NORTH EXHAUST FAN                                          OF AUXFPT. 12'BOVE THE FLIL 21      9    140/4FP-    0  TURBINE BUILDING YEN/WEST                  TURBINE  591.00 W MOTOR ORIV AUXFDWTR PUMP RM. IN THE      591.00  Yos  Bourxsng Spectrum vs. SSE                      Yes  Yes    Yos X1            MOTOR DRIVAUXFEED PUMP                                    SE REGN OF THE RM. Ir SE OF W MDAFWP, ON                  Grand Response Specinxn ROOM EAST EXHAUST FAN                                      THE S WALL,3'BOVE THE FUL Ikvutp p-    0  TURBWE BUILDING VEN/WEST                  TURBINE  591.00 W MOTOR DRIVAUXFDWTR PUMP RM, W SW          591.00  Yos  Boundsig Spectnsn vs. SSE                Yes  Yes          Yes X2            MOTOR DRIVAUX FEEDWATER                                    REGN OF THE RM,  8'W  OF W MDAFWP, OM                    Ground Response Spectrum PUMP ROOM WEST EXHAUST FAN                                THE S WALL.3'BOVE THE FUL 14V-          AUX BUILDWGVENTIIAI CONTROL              AUXILIARY        4KV RM,600V SVVGR Area, IN THE SW CORNER    567.00  N/A  1,5 x Bounding specuum  va              Yes  Yes          Yos SGRS-1A          ROD DRIVE EQUIPMENT ROOM                                  OF THE RM, 3' OF VENT FAN &#xb9;140/4GRS-IA,                  Reari$ 5c Median Centered Fker AND WVERTER AREA VENTILATION                              NEAR THE CEIUNG.                                                Response Spectra SOUTH SUPPLY FAN Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
l2/tf /s>
Print or Type Name                                        Signature                        Date                    Print or Type Name                              Si nature                Date
 
J
  ~c
'C
 
Walkdown:              uf 10/18/93                                                                DC CO          .IT 1                                                                                    .'age3of4 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. CI  Equp.lo    Rov      SrstNll/Equ/pmont Ooscnptxxt              Fbor                Room or Row/Column                  Base                  Capacity vs.            Cap >      Anchor          Equip M/x      No                                                Elev.                                                    Elev.                Demand Basis            Demand?      OK?            OK?
24    9        14tv-    0  AUX BUILDINGVENTIIAI 4KV            AUXILIARY        4KV RM, CD 4KV SWOR RM, IN THE NE                633.00  N/A  1.5 x Boundeg Spoor/um vs.          Yos  Yos  Yos SGRS-2          ROOM AB 4NI SWITCHGEAR AREA                          CORNER OF THE RM, ON THE E WALL,                              ROOMc Mtxsan Centered Roor VENlllATIONSUPPLY FAM                                      THE FLR 12'BOVE Response S      a 14tv      0  AVXBUILDINGVENTIIA/4KV                              4KV RM, CD 4KV SWOR RM, IN THE NW REGN            633.00  N/A  1.5 x Boundeg Spectrum vs.          Yes SGRS3            ROOM CD 4NI SWITCHGEAR AREA                          OF THE RM, 2' OF ll/RBWE ACCESS                                Rear>>tie Median Centered Fbor VEMTBATIOMSUPPLY FAN                                DOORWAY, NEAR THE CEILING. RFC 3063                                    Response Spoor/a WILLCHANGE POWER SUPPLY TO TR A 0  AUXILIARYBUILDWGVICONTROL                            4KV RM. 600V SWOR Area. IN SW. CORNER OF          633.00  N/A  1.5 x Bourxurg Spectrum vs.
ROD DRIVE EQUIP ROOM AND                            THE RM. 2'. OF VENT FAN 14IV<GR~                            Realistic M/xfian Centered Rcor INVERTER AREAVENTILATION                            NEAR S. WAUNEARTHE CEIUNG                                            Rosponse Spoor/a NORTH SUPPLY FAM 2?      9      14IV-      0  AUX BUILDINGVENTIIAI 4KV                            4KV RM,600V SWGRArea, IN THE NE REGN OF          633.00        1.5 x Boundeg Spectrum vs.          Yes        Yes      Yes SGRS-7          ROOM 600V SWITCHGEAR                                RM, 4' OF 600VAC BUS 11B SUPPLY XFMR                          ROSMc Mecssn Centered Roor TRANSFORMER TR.11B AND TR-                          &#xb9;1-TR11B, 1/ ABOVETHE FLR                                              Response Spool/a 11D AREA VENTILATIONSUPPLY FAN 28      9      14tv-      0  AVXIUARYBUILDWGV I 4KV ROOM                          4KV RM. 600V SWOR Area. IN NW. REGN OF                          1.5 x 6/xedeg Spect/um vs.          Yes                  Yos  Yes BGRse            600V SWITCHGEAR                                      RM. T E OF THE TURBINE BUILDINGROOLUP                          ROSMc Me/Ssn Conte/ed Roor TRANSFORMERS TR11A AND                              DOOR, NEAR THE CEIUNG                                                  Rospo/>>e Spectra TR11C AREA VENTILATIONSUPPLY FAN 14tv-      0  AVXIUARYBUILDINGV I 6OOVAC                    613.00 4KV RM. Mezzanee Area. IN MIDDLES. REGM          633.00  N/A  1.5 x Bounding Spectnm vs.          Yos  Yes  Yes BGRse            MOTOR CONTROL CENTER                                OF THE RM, NEAR PLANT BATrERY CONTROL                          ROSSSSc  Median Centered Fbor MEZZANINEAREA VENlltATION                            PANEL 14IA~, 10/ ABOVE THE FLR                                        Response Spect/a SUPPL FAN 14tv-      0  AUX BUILDINGVENTRA/4KV                              4KV RM. 600V SWOR Area, IN SW. REGN OF                          1.5 x Boundeg Spect/um    vs.      Yos  Yes  Yos SGRX-2          ROOM AB 4KV SWITCHGEAR AREA                          THE RM, tr w. 0F 600vAc Bus 11A swGR DN                        ROSSSSc  M/xfian Conlered Fbor VENTIIATIONEXHAUST FAN                              THE W. WALL4'BOVE THE FLR                                              Res      Spectra 31      9      14IV      0  AUX BUILDWG VENTltA/4NI                              4KV RM, 600V SWGR Area,                          633.00  NIA  1.5 x Boundeg Spectnet    vs.      Yos        Yes      Yes SGRX4            ROOM CO 4NI SWITCHGEAR AREA                                                                                        Reasstic Mtxfian Centered  Fbor VENTItATIOMEXHAUST FAM                                                                                                    Response Spectra 14IV.      0  AUXBUILDINGVENTitA/AB                                AB SAlT EQUIP AREA. IN THE CENTER OF THE          633.00  N/A  1.5x Boundeg Spectrum    vs.      Yes        Yes            Yes SORY            BAlTERYEQUIPMEMTAREA                                RM, NEAR THE CEILING.                                          Res/istic M/xfian Centered Fbcr BATTERY ROOM VENlllATION                                                                                                  Response Spectra EXHAUST FAM 14tv      0  AVXBUILDING VENTIIAI CD                              SWGR CABLE SPREADING RM, IN THE NE                              1.5 x Bound'eg Spect/um vs.        Yos  Yes  Yos      Yos  Yes SGRX4I          BATTERY EQUIPMENT AREA                              REGN OF THE RM, 15' OF A CEMENT                                ROOMc Median Centered Floor BATTERY ROOM VEIrntATION                            COLUMN. NEARASWALI NEARTHEFLR                                        Response Spectra EXHAUST FAN 124I-      0  AVXBU/LDINGVENTILAI CCW                              HALLWAY,IN SW REGN OF THE HALLWAY.          20'33.00      N/A  1.5 x Boundeg Spect/um vs.                              Yos VACC-1          PUMPS VENTILATIONNORTH                              SWOF CONTAUXSUBPNL&#xb9;ZCAS,12'ABOVE                              ROSMc MaSan Conb/red Boor SUPPLY FAN                                          THE FLR                                                                Re        S      a I 24IV-    0  AVXBUILDINGVENTILAI CCW            AUXILIARY        HALLWAY,IN THE SW REGN OF THE                                  1.5 x Boundeg Spoctnel vs.          Yes        Yes      Yos ACCP-2          PUMPS VENTIIATIONMIDDLE                              HALLWAY,20'W OF CONT. AUXSUBPNL &#xb9;2-                            ROOSsdc Me/San Centered    Fbor SUPPLY FAM                                          CAS. 12'BOVE THE FLR.                                                  Re        S 124IV      0  AVXBUILDINGVENTIIAI CCW            AUXILIARY        HALLWAY,IN THE SW REGN OF THE                                  1.5 x Bounding  spoor/um vs.      Yos                  Yos  Yes ACCPG            PUMPS VENTILATION SOUTH                              HALLWAY,20'WOF CONT AUX SUBPNL &#xb9;2-                            Rear>>5c Median    Centered Boor SUPPLY FAN                                          CAS. 12'BOVE THE FLR                                                  Re        Spectra Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
lv    fV Print or Type Name                                  Signature                        Date                          Print or Type Name                                Si nature                Date
 
~ 4 L.
 
Walkdown:            . of 10/18/93                                                              DC CO          .SIT 1                                                                                  Page 4 of 4 SCREENING VERIFICATION DATA SHEET (SVDS) 37 Eq. Cl 9
Equip.ID Nrx 124IV-ESW4 124IV-Rov No 0
0 System/Equtpmont Descr'ption SCREENHOUSEVENTIIAT/UNIT1 WEST ESW PUMP ROOM SUPPLY VENTILATION FAN SCREENHOVSE VENTIIATIUNIT 1 SCREENHOUSE SCREENHOUSE Fkgr Ekrv.
591.00 591.00 Room or Rowlcokmn W ESW PUMP RM, W THE SW CORNER OF THE RM, 15'WOF W ESW PP. 13'ABOVE THE FLR W ESW PUMP RM, W SE CORNER OF THE RM, 587.00  NIA N/A 1.5 x  ~  Capacity vs.
Demand Bash Rearadc Median Re 1.5 x Boundeg Spoctiuri vs.
Centered Fkxx Spectra Spectrum vs.
Cap >
Demand?
Caveats OK?
Yes Anchor OK?
Yes Yos Yes Yes Equp OK?
Yes Yes ESW4            WEST ESW PUMP ROOM SUPPLY                            15'E OF W ESW PP, 13'BOVE THE FLR                      Roassdc Morgan    Centered Fker VENTllATIONFAM                                                                                                      Response  Spears 124IV-      0  SCREENHOUSEVENTILATIUNIT&#xb9;1 SCREENHOUSE        591.00 E ESW PUMP RM, IN THE SW CORNER OF THE    587.00        1.5 x Boundeg    Spectrum vs.      Yes    Y8$    Yes    Yes    Yes ESW.?          EAST ESW PUMP ROOM SUPPLY                            RM, IS SE OF E ESW PP, 13'ABOVE THE FLR                R8$ 5c Morgan 5$            Centered Fkxx VENTILATIONFAM                                                                                                      Rasper>>e Spectra I 24tv          SCREENHOUSEVENTIlAT/UNIT1
                                                                                                                                                    ~
0                                    SCREENHOUSE 591.00 E ESW PUMP RM, IN SE CORNER OF THE RM,            N/A  1.5 x Boundeg Spoof/uii vs.        Yes    Y8$    Yos    Y8$    Yes ESW4I          ESW PUMP ROOM SUPPLY                                15'SEOF E ESWPP,13'ABOVETHEFLR                          Realsdc Morgan Centered Boor VEMTltATIOMFAN                                                                                                      R        Spectra 41    10      14tv-      0  CONTROL ROOM VENTIIAI                        650.00 CONTROL RM, A/G RM,                                N/A  1.5 x            Spectnsn vs.      Yes    Yes    Yes    Yes    Yes ACRA-I          CONTROL ROOM VENTRATION                                                                                      ROSMc Morfue Centered Boor NORTH AIR HANDLER PACKAGE                                                                                            R        Spectra 42    10        14tv      0  CONTROL ROOM VENTILAI                        650.00 CONTROL RM, A/C RM,                                      1.5 x Botedeg Spoanm vs.                  Yes    Yes          Yes ACRA-2          CONTROL ROOM VENTILATION                                                                                    Real>>dc Morgan Centered Boor SOUTH AIR HANDLER PACKAGE                                                                                            R ossa>>o 43    10  14tv~s-        0  AVXBVILDWGVENTIIAIAUX              AUXILIARY 633.tn NORMALBLOWDOVVMFLASHTANKRM,                        N/A  1.5 x Boundeg Spearum vs.                  Yes                  Yes 1 (FLT)        BUILDINGVEMnlATION                                                                                          Realsdc Median Centered Floor ENGWEERED SAFETY FEATURE                                                                                            Response Speara EXHAUSTAIR FILTER UNIT    &#xb9;I 44    10    14IV~S-        0  AVXBUILDINGVENTIIA/AVX              AUXILIARY 633.00 NORMAL BLOWDOWN FLASNTANKRM,                            1.5 x Boundeg S peanm vs.          Yes    Yes    Yos    Y8$    Yes 2 (FLTj        BullDINGVENTllATION                                                                                          RoarLsdc Mec&#xb9;se Centered Fkgr ENGWEERED SAFETY FEATURE                                                                                            Response Spectra EXHAUSTAIR FILTER UNIT &#xb9;2 45    11    14IV4CR        0  CONTROL ROOM A/C CHI I              AUXILIARY 650.00 CONTROL RM, AC RM,                                      1.5 x Boundeg Speanm vs.            Yes    No    No    Yes 1            CONTROL ROOM NORTH UQUID                                                                                    R8$ 5$ 5c Morgan Centered Roar CHILLER PACKAGE                                                                                                    Response S        a 46    11    14tv&CR-      0  CONTROL ROOM A/G CHI I                        650.00 CONTROL RM, AIG RM,                                      1$ x Boundeg Spoanm vs.
2            CON1ROL ROOM SOUTH UQUID                                                                                    Rear>>dc Morfutn Centered Floor CHILLER PACKAGE                                                                                                      R          S      8 47    11    14IE43H        0  CONTROL ROOM A/G CHII CONTRL        AUXILIARY 650.00 CTRL RM AIR COND RM                                      1S x Boundeg Spoctnm vs.            Yes                          Yes ROOM AC NORTH UQUID CHILLER                                                                                  Roar>>58 Mtxfian Centered Fkxx HVJLCRI EVAPORATOR                                                                                                  R          S      a 48    11    I +E43S      0  CTRL RM AIR CONDmo I CONTROL                  650.00 CTRL RM AIR COND RM, IN THE SW PART OF                  1.5 x Boundeg Spectrum vs.          Yes    Yes    Yes
                                                                                                                                                    ~
ROOM AIR CONDmoNING SOUTH                            THE RM, ON THE SO. WALL2 FT ABOVE THE                  Rear>>dc Mec&#xb9;an Centered Fkxx UQUID CHILLER HV~R-2                                  FLR                                                            Response Spectra EVAPORAT 49    11    1&EMN          0  CONTROL ROOM AC CHI I                          650.00 CTRL RM AIR COND RM                                N/A  14 x            Spoctn&#xc3;i vs.                      Yes          Yes CONTROL ROOM A/G NORTH                                                                                        Rear>>dc Median Centered Fbor LIQUIDCHILLER HVAR-1                                                                                                Response Spectra CONDENSER 50    11    1&ERAS        0  CONTROL ROOM A/G CHI I              AVXIUARY  650.00 CTRL RM AIR COND RM                                      1.5 x Boundeg Speanm vs.                  Yes    Yes CONTROL ROOM A/G SOUTH                                                                                        Realouc Median Centered Floor LIQUID CHILLER HVAR-2                                                                                                Respor>>e Speara CONDENSER Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
(z ~i~ few Print or Type Name                                    Si nature                      Date                    Print or T pe Name                                Signature                  Date
 
Walkdown:    tt(~fJuly 18, 1992                                                            DC C            nit1                                                                              Page 9 of 10 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Ci              Rev            system/Equpmant Descnption                            Fkxrr Eiev.                            Base Eiev. <47?    Cspacrty vs. Cap>  Csvests Ancnor  Interact Equp No                                                                                                                            Demand Basis    Damd?  OK?    OK?      OK?    OK?
18    14iPP-1 51  0  PRESSURIZER IPRESSURIZER(OMEN) LEVEL              CONTAINMENT      612.00    INSTRUMENTATIONRM. 5'W      612.00    Yes Boundng Spectrum                Yes              Yes TRANSMllTER                                                                  OF THE 612 AIRLOCKDOOR,                      vs. SSE Ground IN THE SW CORNER OF THE                          Response RM. ON THE W WALL                                S 18    14PP-152    0  PRESSURIZER I PRESSURIZER (OME<) PRESSURE          CONTAINMENT      612.00    INSTRUMENTATIONRM, ON        612.00    Yes Boundny Spectrum                Yas TRANSMITTER                                                                  THE CONT. WAUNEARCOL                        vs. SSE Ground 913, NEAR ANNULUS HATCH,                        Response 2'BOVE THE FlR                                  S 18    14PP-153    0  PRESSURIZER/PRESSURIZER(OMEN) PRESSURE            CONTAINMENT      612.00    INSTRUMENTATIONRM, ON        612.00    Yes Boundstg Spectrum        Yes    Yas      Yes TRANSMITTER                                                                  THE CRANWALLNEAR COL                        vs. SSE Ground 815. NEAR THE SEAL TABLE                        Response STAIRS                                          S 18    1+PS-121    0  REACTOR COOlANT I REACTOR COOLANT LOOP 2 HOT      CONTAINMENT      612.00    W CONT LOWER VENT RM,        61 2.00    Yas Boundny Spectrum                Yes      Yes LEG WIDE RANGE PRESSURE TRANSMITTER                                          ON CRANEWALLSIDE OF THE                      vs. SSE Ground WALKWAY,1'ROM CONT.                              Response LowER YENT ve wo/EELY-2,                        Spctrurn 5'BOVE FLR 18    14IPS-122  0  REACTOR COO(ANTI REACTOR COOLANT LOOP      1 HOT  CONTAINMENT      611.00    E CONT LOWER VENT RM.        598.00    Yes Boundng Spectrum                Yes LEG WIDE RANGE PRESSURE TRANSMBTER                                            NEAR COLUMN 8 5. NEAR THE                    vs. SSE Ground DOORWAY TO VENT UNIT 8 1-                        Response HVCLV-1                                          S 87    18      WERI-21    0  NUCLEAR INSTRUMENTATI NUCLEAR 0IST. WIDE          CONTAINMENT      626.00    REACTOR CAVITY,AZ.090,      625.00    Yes Boundng Spectrum                Yes      Yes RANGE RADIATIONDETECTOR                                                                                                    vs. SSE Ground
 
===Response===
S 18      1&RI-23    0  NUCLEAR INSTRUMENTAT/NUCLEAR01ST. SOURCE          CONTiuNMENT      626.00    REACTOR CAVITY,AZ:270,      625.00    Yes  Bourxlny Spectrum                        Yes RANGE RADIATIOMDETECTOR                                                                                                    vs. SSE Ground
 
===Response===
18  1.XRV-RACK-  0  CONTROL AIR I PRZTRW PRESSURE RELIEL VLVNRV-      CONTAINMENT      650.00    UPPER CONT, ON THE          650.00    Yes  Boundrng Spectrum        Yes            Yes 152        152 VLVRACK EMERG AIR PRESSURE REGULATOR                                      CRANEWALLSIDE OF THE                        vs. SSE Ground AREA, ON THE OUTSIDE OF                          Response THE PRZ DOGHOUSE 18  1-xRV~K-      0  CONTROL AIR I PRZ TRA PRESSURE RELIEF VLVSNRV      CONTAINMENT      650.00    UPPER CONT, ON THE          650.00    Yes  Boundrny Specuum        Yes    Yes      Yes 153        153 VLVRACK EMERG AIR PRESS REGUlATOR                                        CRANEWALLSIDE OF THE                        vs. SSE Ground AREA, ON THE OUTSIDE OF                        Response THE PRZ DOGHOUSE                                S 91    19    INTR-110    0  REACTOR COOLANT/REACTOR COOLANT LOOP 1 HOT        CONTAINMENT      598.00    LOWER CONT QUAD 1, AZ        598.00    Yes  Boundng Spectrum  Yes  Yes    N/A      Yes LEG WIDE RANGE TEMP RECORDER THERMALSENSOR                                    015. OM THE SHIELD WALL                      vs. SSE Grcund SIDE OF SGIII,2(7ABOVE                          Response FlR                                              Spectrum 19    1&TR-1 20  0  REACTOR COOLANT I REACTOR COOLANT LOOP 2 HOT      CONTAINMENT      617.00    LOWER CONT QUAD 2, AZ        625.00    Yes  Boundng Spectrum  Yes  Yes              Yes    Yes LEG WIDE RANGE TEMP RECORDER THERMALSENSOR                                    169. ON THE SHIELD WALL                      vs. SSE Ground slDE 0F sG 82. DN THE 621                      Response EL PlATFORM                                      Spectrum 19    WITR-130    0  REACTOR COOLANT I REACTOR COOlANT LOOP 3 HOT      CONTAINMENT      625.00    LOWER CONT QUAD 3, AZ                  Yes  Boundng Spectrum  Yes  Yes                    Yes LEG WIDE RANGE TEMP RECORDER THERMALSENSOR                                    194, ON THE SHIELD WALL                      vs. SSE Grourxi SIDE OF SG Srs. ON THE 621                      Response EL PlATFORM Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or Type Name                                    ture                      ate                        Print or Type Name                            S ature                    Date
 
Walkdown: V            f July 18, 1992                                                      DC C          Jnit1                                                                                Page 10 of 10 SCREENING VERIFICATION DATA SHEET (SVDS)
Item  Eq. Ci    Equp ID    Rev                                                                Floor Earv.      Room or Rowicotumn                    Capacrty vs. Cap>    Caveats  Anchor        Equip No                                                                                                                        Demand Base      Demd?    OK?      OK?          OK'?
94    19    14rlR-140    0  REACTOR COOlANT I REACTOR COOLANT LOOP 4 HOT  CONTAtNMENT      598 00    LOWER CONT QUAD 4 AZ                    Boundrrg Spectrum  Yes                      Yes    Yes LEG WIDE RANGE TEMP RECORDER THERMALSENSOR                                336, ON THE SHIELD WALL                  vs. SSE Ground SIDE OF SG &#xb9;4. 20r ABOVE                    Response THE FlR                                      6 95    19    14ITR-210      0  REACTOR COOLANT I REACTOR COOLANT LOOP 1 COLD  CONTAINMENT      598.00    LOWER CONT QUAD 1, AZ              Yes  Bounrang Spectrum  Yes      Yes                    Yes LEG WIDE RANGE TEMP RECORDER THERMALSENSOR                                035. BEIWEEN THE RCP &#xb9;1 8                vs. SSE Grorard THE SHIELD WAUON617                        Response EL PLATFORM                                  Spectrum 96    19    1.NTR-230      0  REACTOR COOIANT I REACTOR COOLANT LOOP 3 COLO  CONTA9IMENT      617.00    LOWER CONT QUAD 3, AZ                    Bouncang Spectrum  Yes                        No    No LEG WIDE RANGE TEMP RECORDER THERMALSENSOR                                236. BETWEEN THE RCP &#xb9;3 8                vs. SSE Ground THE SHIELD WALION617                        Response EL PlATFORM                                  Spectrum 97    19    1~R-240        0  REACTOR CoolANT I REACTOR LOOP 4 COLD LEG      CONTAINMENT      617.00    LOWER CONT QUAD 4. AZ        625.00      Bounrang Spectrum  Yes              NIA      No WIDE RANGE TEMP RECORDER THERMALSENSOR                                    307, BETWEEN THE RCP &#xb9;4  8                vs. SSE Ground THE SHIELD WALL,ON 617                      Response EL PLATFORM                                  Spectrum Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                              i    ture                      ate                      Print or T pe Name                            nature                      Date
 
Walkdown:              uf 10/18/93                                                            DC C          .IT 1                                                                                          .'age  1 of 5 SCREENING VERIFICATION DATA SHEET (SVDS Eq. CI  Erasp.lo            System/Equipment Descnpbon No.                                                                                                                                                          Csp >  Caveats                      Erst Demand?    OK7                          OK7 18    14LI-113    0  CONDENSATE STORAGE T I          AUXILIARY 586.00 STORAGE TANKPIPE TUNNEL, N THE NE              587.00  Yes    Bounding Speanm vs. SSE          Yes              Yes CONDENSATE STORAGE TANKTK-                        AREA OF PIPE TUNNEL, ON THE N                                Ground Response Spectrum 32 LEVEL NDICATOR                                        593 EL PIATFORM.
WAUB'BOVE TRANSMATER 18    1<U-114      0  CONDENSATE STORAGE T I                            STORAGE TANKPIPE TUNNEL IN THE NE              587.00  Yes    Boundng Speanm vs. SSE          Yes CONDENSATE STORAGE TANKTK-                        AREA OF THE PIPE TUNNEL, 10' OF THE CST                      Grourxl Response Specinm 32 LEVEL INDICATOR                                ACCESS lADDER HATCH, 5 ABOVE THE 593 TRANSMflTER                                      EL PLATFORLL 18    tP&410        0  CCWI EAST CGW PUMP PP 110E      AUXILIARY 609.00 HALLWAY,7 FT NW OF EAST CCW PUMP <<12-          609.00  Yes    Boundng Spec/nm vs. SSE          Yes      Yes      Yes        Yos 18    I      F0    0 DISCHARGE PRESSURE SWITCH GCW/WEST GGW PUMP PP-10W DISCHARGE PRESSURE SWITCH AUXIUARY  609.00 PP-10E HALLWAY,5 FT NW OF WEST CGW PUMP 812 PP-10W 609.00  Yes Ground R          Spocbum Bourxlng Spea/um vs. SSE        Yes      Yos                Yes Ground Re          S 18    1+F1-210    0  AUXFEEDWATER I AVX              AVXIUARY  621.00 E MAIN STEAM STOP ENCLOSURE, SW                650.00  N/A  1.5 x Bourxhg Speansn vs.                  Yes                          Yes FEEDWATER To STEAM                                CORNER OF RM                                                ROSMc Mtxfian Centered Boor GENERATOR OME4.1 FLOW Response S pact/a NDICATOR TRANSMffTER 18    14'FIZR      0  AUX FEEDWATER I AUX              AUXILIARY 621.00 W MAIN STEAM STOP ENCCLOSVRE. S                              1.5 x Boundng Spectrum vs.                Yes                          Yes FEEDWATER To STEAM                                CENTRAL AREA OF RM.                                        Reafutic Median Centered Roar GENERATOR OMM-2 FLOW Response Spears NDICATORTRANSMITTER 18    I+F1-230    0  AUX FEEDWATER I AUX              AUXILIARY 621.00 W MAN STEAM STOP ENCCLOSURE, IN THE            650.00  N/A  1.5x Boundng Specuum vs.          Yes              Yes        Yes FEEDWATER TO STEAM                                MIDDLEOF THE N PART OF THE RM. 12'      OF                Realssc Mtxf~ Centered Floor GENERATOR OMEGA FLOW                              CONT PENETRATION <<ICPN4.                                          Response Spectra INDICATORTRANSMRTER 18    MFI440      0  AUX FEEDWATER I AUX              AUXILIARY 621.00 E MAINSTEAM STOP ENCLOSURE, ON THE N                        1.5 x Bandng Spearum vs.
FEEDWATER TO STEAM                                                                                                                                                Yes        Yes WALI ltyNOF STAIRS.                                        Roafrstic Median Centered Fkxx GENERATO OME~ FLOW Response Spectra INDICATORTRANSMITTER 18    14FI410      0  RHR I EAST RHR HEAT              AUXILIARY 609.00 HALLWAY.11' OF RHR HE RM'S DOORWAY, EXCHANGER HE-17E OUTLET LOW 609.00  Yes  Bandng Spectrum vs. SSE          Yes      Yes      Yes        Yes      Yes OM THE N WALL5'BOVE THE FLR                                  Ground Response Spectnm RANGE FLOW NDICATOR TRANSMITTER 10    18    14FI411      0  RHRIEASTRHRHEAT                  AUXILIARY 609.00 HALLWAY,12' OF E RHR HEAT EXCHANGER            609.00  Yes  Boundng S pectnm vs. SSE          Yes      Yes EXCHANGER HE.1 ?E OUTLET HIGH                    RM DOORWAY, OM N WAll,5 ABOVE THE                            Ground Response Spec@urn RANGE FLOW NDICATOR                              FUL TRANSMITTER 18    14FM20      0  RHR I WEST RHR HEAT                              HALLWAY,15' OF THE PASSENGER                  609.00  Yes  Boundng Spectrum vs. SSE          Yes      Yes      Yes      Yes EXCHANGER HE.1?W OUTLET LOW                      ELEVATOR, ON THE N WAU 5'ABOVE%HE                            Ground Response Spoctnm RANGE FLOW INDICATOR                              FLR TRANSMRTER 12    18    14FF321      0  RHR I WEST RHR HEAT              AUXILIARY 609.00 HALLWAY.15' OF THE PASSENGER                                Boundng S pearum vs. SSE          Yes EXCHANGER HE-17W OUTLET HIGH                      ELEVATOR. ON THE N WAU 5 ABOVE THE                          Gnxnd Response Spoanm RANGE FLOW NDICATOR                              FUL TRANSMITTER 13    18    14LS-950      0  RWST SUPPLY/RWST                                  STORAGE TANKPIPE TUNNEI IN THE NE              587.00  Yes  Boundng S pearum va SSE          Yos      Yes                          Yes LOW LEVEL                              AREA OF PIPE TUNNEI 8 E OF REFUELNG 7K'XTREME Gnxnd Response Spectnm TRANSMITTER                                      WATER STORAGE TANK VALVEHOUSE lADDER, ON N WALL7'BOVE 593 EL PlATFORM.
Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entiy and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
                                                                                        )~    2(                                                                                                        n.&~ as Print or T pe Name                                  in  ure                      Date                        Print or T pe Name                              Si nature                          Date
 
)I Wr 'lA
 
Walkdown:            df 10/18/93                                                          DC CO        .<IT 1                                                                                        rsage 2 Of 5 SCREENING VERIFICATION DATA SHEET (SVDS)
Equip.iD  Rav                                            FIXE/                                                  Base                                          Csp >  Caveats                Equip No.      No                                            Elev.                                                  Elav.                                        Demand?  OK?                    OK?
14    18    14LS-SSI    0  RWST SUPPLY I RWST 1K'EVEL                586.00 STORAGE TANKPIPE TUNNEL, W NE AREA OF                          Boundeg Spectrum vs. SSE          Yos    Yos            Yes TRANSMITTER                                      PIPEllJNNEI 12'EOFREFUEUNGWIR                                  Ground Rasper>>e Spectrum STORAGE TANKVLVLADDER ON N WALL T ABOVE 593 EL PlATFORM.
15    18  144PP-210    0  MAW STEAM/STEAM GENERATOR OME4-1 CHANNEL I STEAM AUXILIARY  633.00 E MAINSTEAM STOP ENCLOSURE, W THE SW REGM OF THE RM. 4'W  OF THE TOP OF N/A  1.5x~
Roarrc Spectrum va.
Marssn Cantered Fkror PRESSURE TRANSMITTER                            STEAM STOP VALVE14VIRV-210, 7 ABOVE 647                              Response Spectra EL PLATFORM 16    18  I MPP-212    0  MAW STEAM I STEAM GENERATOR    AUXILIARY  633.00 E MAINSTEAM STOP ENCLOSURE.                                    1.5 x Boundeg Spectrum vs.        Yes          Yes      Yes    Yes OMM-I CHANNEL IV REACTOR                                                                                      Rear>>dc Median Centered Fker PROTECTION WPVT STEAM                                                                                                Respcnso Spectra PRESSURE TRANSMITTER 17    18  I MPP-220    0  MAINSTEAM I STEAM GENERATOR    AVXIUARY  633.00 W MAW STEAM STOP ENCCLOSURE. 8 NE OF                          14 x Boundeg Spactnsn vs.          Y4$                    Y4$    Yes OMEG-2 CHANNEL I STEAM                          MAINSTEAM STOP VALVE14hRV420, AT 652                          Reef>>tic Median Centered Floor PRESSURE TRANSMITTER                            EL PLATFORM, ON THE CONT WALI                                      Response Spectra LOCATED INSIDE OF BlAST BOX 18    18  '14IPP-222    0  MAIN STEAM I STEAM GENERATOR  AUXIUARY  633.00 W MAINSTEAM STOP ENCCLOSVRE. SE AREA                          1.5 x Boredeg Speci/um vs.                                Yes OMM-2 CHANNEL III REACTOR OF 652 EL PLATFORM, ON CONT WAll                              Reafrsdc Median Centered Fker PROTECTION WPUT STEAM                            LOCATED WSIDE OF BLAST BOX                                          Response Spectra PRESSURE TRANSMllTER 19    18  144PP-230    0  MAW STEAM I STEAM GENERATOR    AUXILIARY  633.00 W MAW STEAM STOP ENCCLOSURE. 8' OF                            1.5 x Boundeg  Speci/uni VL      Yes    Yes            Yas OMEGA CHANNEL I STEAM                            MAtN STOP VALVE14lRV-230, ON THE CONT                        Reafrsdc MaSan  Centered Floor PRESSURE TRANSMITTER                            WALL,AT 652 EL PLATFORM.                                            Re        S      s 18  144PP-232    0  MAW STEAMI STEAM GENERATOR                633.00 W MAINSTEAM STOP ENCCLOSVRE, NE                                1.5 x Boundeg  Specuum vs.                      Yes      Yes    Yes OMEN@ CHANNEL IIIREACTOR                        CORNER OF 652 EL PLATFORM, ON CONT                            Rearrsdc Median  Centered Fker PROTECTION INPUT STEAM                          WAU LOCATED INSIDE OF BLAST BOX                                      Response Spectra PRESSURE TRANSMITTER 21    18  14/IPP-240    0  MAW STEAM I STEAM GENERATOR    AUXILIARY  633.00 E MAW STEAM STOP ENCLOSURE. W NW                        N/A  1.5 x Boundeg Spectnsn vs.                                Yes    Yos OME44 CHANNEL I STEAM                            REGN OF RM, 8 SW OF TOP OF STEAM STOP                        R4$ 5$ 5c Median Cantered Fkcr PRESSURE TRANSMATER                              VALVEWLRV-240, NEAR THE W                                            Response Spears WALI2'BOVE 647 EL PLATFORM.
18  14/IPP-242    0  MAW STEAM I STEAM GENERATOR              633.00 E MAW STEAM STOP ENCLOSURE. W THE NW                          lh  x Boundeg Spectrum vs.                      Yes OME~ CHANNEL IV REACTOR                          CORNER OF THE RM,  8'W  OF lHE TOP OF                        Rear>>gc Motif>>e Centered Fkor PROTECTION WPUT STEAM                            STEAM STOP VALVE14IRV440, NEAR THE W                                Respcnse Spectra PRESSURE TRANSMRTER                              WAU 2'BOVE THE 647 EL PLATFORM.
18  1+PP~I        0  CONTAINMENTVENTiLATI LOWER                612.00 AIRLOCKAREA, 15'E OF THE 612 El                                1$ x Bounrteg SFOCtrum vL                        Yes      Yes    Yas CONT. CIL III PRESSURE                          AIRLOCK, 3' E OF VALVE 1-VCR-202, O'BOVE                      Reafrsdc Median Centered Floor PROTECTION TRANSMITTER                          THE FLIL                                                              Re      OS      4 24    18                0  COMl'AINMENTVENTILATI LOWER              612.00 AIRLOCKAREA, 15'E OF THE 612 EL                                I 5 x Bounceg Spectnsn vs.
COMTAWMENTCHANNEL u                              /NILOCK, S SE OF VALVE1.VCR-202. 3'BOVE                      Rear>>dc Marfrsn Centered Fkor PRESSURE PROT. TRANSMITTER                      THE FUL INST OWG MSSI AB.                                            Ra      S 25    18                0  CONTAWMENTVENTILATI LOWER                612.00 AIRLOCKAREA, 1' OF CONT PENETRATION                            1.5 x Boundeg Spectrum vs.                                Yes    Y4$
CONTAWMEMTCHANNEL I                              &#xb9;I CPM-86. 4'F VENTILATIONUNIT 4IV      &#xb9;I                  Reafrsdc Morfian Centered Fkor PRESSURE PROTECTION                              CIPX-1, NEAR CONT WAU S ABOVE THE FLR                                Response Spectra TRANSMffTER 18  1OFA-210      0  RCTR COOLANT PMP SEA I RCP      AUXILIARY 587.00 HALLWAY,T E OF DOORWAY To THE                            Y4$    Boundeg Speci/um vs. SSE WATER ULIECTIONTO RCP PP<5 1                    STARTUP BLOWDOVW FlASHTANKIU/rs                                Ground Response Spectrum LOW FLOW ALARMTRANSMITTER                        RAMP. ON THE N WAll.6'BOVE THE FLR 27    18  1 MFA-220    0  RCTR COOLANT PMP SEA I RCP    AUXILIARY  587.00 HAlLWAY,T E OF DOORWAY TO THE                                  Bounrfeg Spectnsn vs. SSE SEAL WATER WJECTION TO RCP 2                    STARTVP BLOWDQM FlASHTANKRhfs                                  Ground Response Spectnsn LOW FLOW AlARMTRANSMITTER                        RAMP. 0 N THE N WALl 6'BOVE THE FLR Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
rz />r    its                                                                                              I/2 //0 /9$
Print or T pe Name                              Si nat re                        Date                          Printer T pe Name                                Si nature                    Date
 
Walkdown:              df 10/18/93                                                              DC COL.      rlT 1                                                                              reage30f5 SCREENING VERIFICATION DATA SHEET (SVDS)
Equ'P.ID  Rov                                                                                                    Base              Capacsy vs.          Cape  Cevoats                Equip Ma        No                                                                                                    Elev.            Demand Base            Demand?  OK7                    OK?
28      18  1<PA-230      0  RCTR COOIANT PMP SEAI RCP        AVXIUARY  587.00  HALLWAY,7' OF DOORWAY TO THE                  587.00  Yes Bourding Speansn vs. SSE      Yes                  Yos      Yes SEAL WATER NJ ECTION TO RCP 3                      STARTVP BLOWDOWN FIASHTANKRM'S                            Ground Response Spearum LOW FLOW ALARMTRANSMITTER                          RAMP. ON THE N WALL6'BOVE THE FLR 18  14?FA-240    0  RGTR COOLANT PMP SEA I RCP      AUXILIARY 587.00  HALLWAY.7' OF DOORWAY TO THE                  587.00  Yes Botndstg Specuum vs. SSE      Y8s                  Yes      Yes SEAL WATER TO RCP 4 LOW FLOW                      STARTUP BLOWDOWN FIASHTANKRM'S                            Ground Response Spearum ALARMTRANSMITTER                                  RAMP. ON THE N WALl,O'BOVE THE FlR 18    14?F l-200  0  CVCS - CHARGING I GVGS CHG PPS  AUXILIARY 587.00  HALLWAY,ON W WALI 1ir N OF CHARGING                      Boundstg Spectrum vs. SSE              Y88  Yes              Yes DISCH FLOW NDICATOR                                PUMP RM DOORWAY NST DWG. 124565, 1                        Ground Respor>>e Spearum 5531 B 31      18  14?LC451      0  CVCS I REACTOR COOLANT          AUXILVIRY 609.00  HALLWAY,10' OF FREIGHT ELEVATOR, ON          609.00  Yes Botndng Spectrum vs. SSE                    Yes  . Yes      Yes LETDOWN VCT TK-1 0 EXTREME                        THE N WAUS'BOVEFLR                                      Ground Respor>>e Spectnsn HIGH LEVEL CONTROL TRANS MflTER 18  142LG452      0  GVCS I REACTOR COOLANT                            VOLUME CONTROL TANKRM, ON sW SIDE oF          609.00  Yes Bounding S pectnsn vs. SSE    Yes    Yos  Yes    Yes      Y8s LETDOWN VCT TK-10 HIGH LEVEL                      TANK, 1P ABOVE THE FLR                                    Ground Response Spectrum CONTROL TRANSMITTER 18  I-WDS.?01    0  ESWI EAST ESW PUMP PP-TE      SCREENHOUSE 591.00  E ESSNTL SERV WTR PMP RM                      591.00  Yes Boundng Spectrum vs. SSE      Yes    Yes  Yos    Yes      Yes DISCARGE STRAINER OME44E                                                                                    Groufxl Reaper>>o Spctrufrt HIGH Dip FERENTIAL PRESSURE SWITCH 18  1 WDS.?02    0  ESWI WEST ESW PUMP PP-7W      SGREENHOUSE 591.00  W ESSNTL SERV WrR PMP RM                      591.00  Yes Boundng Spearum vs. SSE        Yes                            Yes DISCHARGE STRANER OMEGA                                                                                      Ground Response Spectrum HIGH DIFFERENTIAL PRESSURE SWITCH 18  1.WPS-701    0  ESWI EAST ESW SUPPLY HEADER      TVRBINE  569.00  ESSNTL SERV WTR PIPE TVMNEL                  591,00  Yes Boundng Spearum vs. SSE                      Yes    Yes      Yes PRESSURESWITCH                                                                                              Ground Re        S 18  1.WPS.70S      0  ESWI WEST ESW SUPPLY HEADER      TURBWE  569.00  ESSMTL SERV WTR PIPE TUNNEL                  591.00  Yes Bounding spearum vs. ssE      Yes    Yos  Yes    Yes      Yes PRESSURESWITCH                                                                                              Grand Response S 37      18    12%PS        0  GCW I SPARE GCW PUMP            AUXILIARY 609.00  HALLWAY,4 FT Mw OF THE SPARE    Ccw pvMP 609.00      Yes Bouxtng Spearum va SSE                                        Yes 430          DISCHARGE PRESSURE SWITCH                          8124'P 10. 3 FT ABOVE THE FLR                            Ground Re        S 1TROIS        0  GCW I EAST CCW HEAT              AUXILNRY  609.00  HAlLWAY,                                      609.00  Yes Boundrtg S pearum vs. SSE                            Yos      Yes EXCHANGER HE-1 5E CCW OUTLET                                                                                Ground Response Spectrum TEMPERATURE RECORDER THERMALSENSOR 19    1CTR425      0  GGWI WEST COMPONENT                                HALLWAY.ON N. END OF W. COMPONENT            609.00  Yes Boundng Spectrum vs. SSE      Yes    Yes            Yes    Yos COOUMG WATER HEAT                                  COOUNG WATER HEAT EXCHANGER 14IE-                        Ground Response Spearum EXCHANGER HE-1 5W CCW OUTLET                        15W, 6'BOVE FLR TEMPERATURE RECORDER THERMALSENSOR 19    1-VrS-201    0  TURBINE BUILDWGVEN I EAST        TURB WE  59I.CO  E MOTOR DRIV AVXFDWTR PUMP RM. Ir NW.        591.00 Yes souring Spearum vs. SSE                Yes            Yes MOTOR DRIVEN AUXILIARY                              OF E MOTOR DRIVEN AUXILIARYFDWTR                        Grand Rospa>>e Spearum
                                                                                                                                            ~
FEEDWATER PUMP ROOM                                PUMP 1 PPNE, ON W. WAll 8'BOVE FLR EXHAUST FAM HV4FP4N THERMALSENSOR O'I    19                  0  TVRBWE BUILDWGVEN I TVRBWE        TURBWE    591.00  TURB DRIVAUX FDWTR PUMP RM, N SE.            591.00 Yes          Spectrum vs. SSE                            Yes    Yes DRIVEN AUXIUARYFEED PUMP                            REGN OF RM,  6'. OF TURBNE DRIVEN                        Ground Response Spectrum ROOM NORTH EXHAUST FAN HV-                          AVXllARYFEED PUMP 14'PA, ON S. WAU AFP-T1 THERMALSENSOR                                      FLR 9'BOVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
l2-    Z                                                                                        ]z(/f,(gs Print or T pe Name                                in  ure                        Date                    Print or T pe Name                            Si nature                    Date
 
Walkdown:            .. of 10/18/93                                                            DC COL .      BIT 1                                                                                            Page 4 of 5 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl    Equ'p. ID  Rev                                              Floor              Room or Rowlcoasmn                                                                    Cap >  Cavoats                  Eq>>p No.      No                                              Elev.                                                                                                  Demand?  OK?    OK?              OK?
42    19    1.VTS-204    0  TURBWE BUILDWGVENITURBINE,                591.00  TURB DRIV AVXFDWTR PUMP RM. IN NE                              Yes  Bandng Spectrum vs. SSE      Yes    Y4$    N/A                Yes DRIVEN AUXILIARYFEED PUMP                          REGN OF RM,  8'. OF TURBINE DRIVEN                                  Ground Response Spectrum ROOM SOUTH EXHAUST FAN HV-                        AUXILIARYFEED PUMP 14'PR, ON N. WAU AFP T2 THERMALSENSOR                                      FLR                                        8'BOVE 43      19    1.VTS-206    0  TURBINE BUILDWGYEN I WEST        TURBINE  591.00  WMOTOR DRIVAUXFDWTR PUMP RM, IN SW.                      591.00 Yes  Bouaing Spectrum vs. SSE                              Yes MOTOR DRIVEN AUXILIARY                            CORNOR OF RLL ON S. WALI 6'BOVE FLR                                  Grand Response Spectrum FEEDWATER PUMP ROOM WEST EXHAUST FAN NMFP-X2 THERMALSENSOR 44      19    1-VTS440      0  DIESEL BVILDWGVENTIAB                      596.00  REACTOR CABLE TUNNEI QUAD. <<3, IN SW.                          Yes  Boundng Spectrum vs. SSE      Yes    Yes EMERGENCY DIESEL GENERATOR                        REGN OF RM, 15'. OF FIRE DOOR $ 325, ON                              Gland Respor>>e  Spectrum ROOM VENTILATIONFANS                              VENTltATIONEXHAUST FAN 14IVZT-7, Ir OUTSIDE AIR THERMOSTAT                            ABOVE THE FLR 45      19    1-V16450      0  AUXIUARYBUILDWGV I CONTROL      AUXILIARY 609.00  INVERTER AREA, W NE. CORNOR OF RM,          6'E.
Yes  Boundng Spectrum vs. SSE      Yes    YOS              Yes ROD DRIVE EQUIP ROOM AND WV                            OF THE ENTERANCE DOOR. ON E. WAU4'BOVE Ground Response Spectrum ARFAVENT SOUTH SUPPLY FAN                                FLR HV4GRA.1A TEMPERATURE SWITCH 46      19    1-vrs451      0  AUXILIARYBUILDING V/CONTROL      AUXILIARY 609.00  CONTROL ROD DRIVE EQUIPMENT RM, IN NW.                              Boundng Specinsn vs. SSE      Yes    Y4$
ROD DRIVE EQUIPMENT ROOM                          REGN OF RM,  1'. OF THE RLrs ENTRANCE                                Grourxl Respor>>e Spectrum AND WVAREA VENT SOUTH                              DOOR,ONTHEN,WAU 5'ABOVETHEFLR SUPPLY FAN HVCGRS-1 A TEMPERATURE SWITCH 47      19    t.vrs452      0  AUXILIARYBUILDINGV I 4KV ROOM    AUXILIARY 609.00  4KV RM, 600V SWGR Ares,                                              Bandng Spectrum vs. SSE      Yes    Yes  N/A    ~  Yes 600 VOLT SWOR XFRMS TR1 18                                                                                              Ground Respcnsa Spectrum AND TR11D AREA VENT SUPPLY FAN HVCGRS 7 TEMP SWITCH 46      19    1-Vr&053      0  AUXILIARYBUILDINGVl600VAC                  613.00  4KV RM. Mozzans>> Area. W NW. REGN OF RM.                            Bandng Spectrum vs. SSE                                YOS MOTOR CONTROL CENTER                              2'. OF 4MV BUS SWITCH GEAR 1 11PHA, ON YOS Ground Response Spectrum MEZZANWEAREA VENT SUPPLY                          THE W. WALL,S ABOVE THE FLR FAN SGRS4 TEMPERATURE SWITCH 49      19    I.VTS454      0  AUXILIARYBUILDINGV I CONT ROD    AUXILIARY 609.00  WVERTER AREA. IN NW. REGN OF RM, 6'W.                                Bounchg Spectrum vs. SSE              Y4$  NIA        Yes    Yes DRIVE EQUIP ROOM AND INVAREA                      OF THE ENTRANCE DOOR, ON THE W. WAUS                                Ground Response Spectrum OUTSIDE tuR WLET DAMPER HV-                        ABOVE THE FLR SGR440-1 ANO 2 TEMP SWITCH TO OVERRIDE PNEUMATIC CONTROLLER 50      19    1  VTS455      0  AUXILIARYBUILDINGVIGRID AND                609.00  WVERTER AREA, IN NE. CORNOR OF RM,          6'E              Yos  Boundng Spectrum vs. SSE      Yes    Y4$
CROM WVAREA VENT AIR WLET                          OF THE RMS ENTRANCE DOORWAY, ON THE                                Grand Respor>>e Spectrum DAMPER HV4GR4iio-1 AND 2                            E. WALI4'BOVETHE FLR TEMP SWITCH To OVERRIDE PNEUMATIC CONTROLLER 51      19    1 -V164$ 6    0  AUXILIARYBVILDWGV I CNTRL                  609.00  INVERTER AREA. W NW. REGN OF RM, 6'W.                              Bandng Spectrum vs. SSE                      i trA    Yes    Yes ROD DRIVE EQUIP ROOM AND WV                        OF THE ENTERANCE DOOR, ONWWAU S                                    Grand Response Spectnsn AREA VENT NORTH SUPPLY FAN                          ABOVE THE FLR HVAR~      TEMP SWITCH Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there shoukf be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
2 i/4/9ro Print or Type Name                              Si    ature                      Date                                Print or T pe Name                          Si nature                      Date
 
Watkdown:        ., of 10/18/93                                                            DC CO v ~NIT 1                                                                                    Page5of5 SCREENING YERtFtCATtON DATA SHEET (SYDS)
Equp.to    Rev                                              Floor                                                                  Capacrty vs.          Cap e  Caveats                Equip No.      No                                              Elev.                                                                Demand Basis          Dernsnd7  OK7    OK7            OK7 19  1-VTS457    0  AUXIUARYBUILDBIG V I CONTROI.                      CONTROI. ROD DRIVE EOUIPMENT RM, IN NE.            Yes  Boundrng Spectrum vs. SSE    Yes                            Yes ROD DRIVE EOUIPMENT ROOM                          REGN OF RM. 6' OF THE fVES ENTRANCE                      Grourd Response Spectnsn AND INVAREA VENT NORTH                            DOOR, ON THE N. WALI4'BOVETHE FLR SUPPLY FAN HV4GRS4A TEMPERATURE SWITCH 19  1.vrs402    0  AUXILIARYBUILDINGV/4KVROOM                                                                            Yes  Boundstg Spectrum vL SSE      Yes                            Yes AB 4KV SWITCHGEAR AREA                                                                                      Ground Response Spectrum VENTILATIONSUPPLY FAN HV-SGRSQ THERMALSENSOR 1-vrs4xl    0  AUXIUARYBUILDVIGV I 4KV ROOM    AutuLIAIIY                                                          Yes  Boundstg Spectnsn vL SSE      Yes
                                                                                                                                          ~
CD 4KV SWITCHGEAR AREA                                                                                      Ground Response Spectrum VENTILATIONSUPPLY FAN HV-SGRS4 THERMALSENSOR 19                0  AUXIUARYBUILDINGV I 4KV ROOM    AUXILIARY                                                                          Spectrum vs. SSE      Yes    Yes    N/A            Yes 600V SWOR XFMRS TR11B AND                                                                                  Ground Respor>>e Spectrum TR11D AREA VENT EXHAUST FAN HV4GRS-7 TEMP SWITCH THERMALSENSOR 19                0  AUXIUARYBUILDINGV I 4KV ROOM    AUXILIARY        4KV RM. AB 4KV SWGR RM. IN THE NW                  Yes  Ouuxrrng Spectrum vs. SSE      Yes    Yes    NIA            Yes 600VAC SWGR XFMRS TR11A AND                        CORNER OF THE RM, ON THE W WALIIZ                      Ground Response Spectrum TR11C AREA VENT SUPPLY  FAN                        ABOVE THE FUL HVCGRSB TEMP SWITCH THERMALSENSOR 57    19  12-VTS-706    0  SCREEN HOUSE VENTIIA/UNIT1    SCREENHOUSE  591.00 W ESW PUMP RM. 20'. OF W. ESSENTIAL      591.00  Yes  Boundstg Spectrum vs. SSE                    NIA    Yes    Yes WEST ESSTIAL SERVICE WATER                        SERVICE PUMP 1+P-TW. ONW. WAU 1I7                        Ground Response Spectrum PUMP ROOLI TENIPERATURE                            ABOVE FLR SWITCH THERMALSENSOR 19  12 VTS 706    0  SCREEN HOUSE VENTIIAI UNIT 1  SCREENHOUSE  591.00 E ESSENTIAL SERVICE WATER PUMP RM, ON      591.00  Yes  Boundstg Spectrum vL SSE      Yes    Yes            Yes    Yes EAST ESSENTIAL SEIMCE WATER                        F WAU Ir NE. OF E. ESSENTIAL SERVICE                    Grourxl Response Spectrum PUMP ROOM TEMPERATURE                              WATER PUMP 1+P-TE, 6'BOVE THE FLR SWITCH THERMALSENSOR Certification:
Allthe information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
I      il ~                  Print or T pe Name                          Si nature z./( (vs Print or T pe Name                              Si  at e                        Date                                                                                                Date
 
Walkdown:              ek of 11/1/93                                                      DC CO            NIT 1                                                                          age    1 of1 SCREENING VERIFICATION DATA SHEET (SVDS)
Item  Eq Cl    Equp.lo  Rev    System/Etrspment Descrpten    Buedng. Floor            Room or Row/Coksnn              Base  <47        Cepecrty vs.          Cep >  Csveais Anchor  Into/oct  Equst No. No                                              Elev.                                            Elev.            Demand  assis        Oemsnd?  OK?    OK?      OK?    OK?
1.ERR    0  CONTROL ROOM EAST REAR        AUXIUARY    633.00 CONI'ROL RM, IN THE NE REGION OF THE RM,  633.00  Yes  Boundrng Spect/um vs. SSE    Yes            Yes      Yes      Yes INSTRUMENT/RELAYRACK                              ON THE EAST WALL                                        Ground Re        Spect/um 0  CONTAINMENTSPRAY/              AUXIUARY    633.00 CONTROL RM, IN THE SW REGION OF THE RM,    633.00  Yes  Boundstg Spectrum vs. SSE    Yes            Yes CONTAINMENTISOLATIONVALVE                          29 FT SWOF THE UNIT SUPERVISOR'S DESK                  Ground Response Spectnsn CONTROL PANEL 3    20    1&RI-21 ~  0  NUCLEARINSTRUMENTAT/NI          AUXII.IARY  633.00 CONTROL RM ONMIDDLEWWALI NEAR                          Bastdstg Spectnsn vs. SSE    Yes            Yes PRCSR        WIDE RANGE SIGNAL PROCESSOR                        REAR OF ESW CONTROL PANEL NZSW, ON N-21 INST/REL RACK 8 INST DWG 14538.
1~    6'BOVE FLIL Ground Response Spectrum 4    20                0  CONTAINMENTVENTIIAT/            AUXILIARY  633.00 CONTROL RM, IN THE SW REGION OF THE RM,    633.00  Yes  Bandeg Speci/um vs. SSE      Yes            Yes VENTILATIONCONTROL PANEL                          34 FT SWOF THE UNIT SUPERVISORS DESK                    G/ound Response Spect/um Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" indudes each entry and condusi (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries an condusions. One signatory should be a licensed professional engineer.)
Print or Type Name                            Signature                          ate                  Print or Type Name                          i    ture                  Date
 
Walkdown:, of July 15, 1991                                                                DC CO            IT 1                                                                              Page2of2 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. CI  Equp.lo  Rev                                  Busdrng. Fker              Room or Row/Coksnn                                  Ca/xtotr vs,        Cap >  Caveats                  Equer No. No                                              Elev.                                                                Domal Basis        Demand7    OK7        OK7          OK7 18    20      1<RI      0  / STATION AUXILIARESREAR                          CONTROL RM, NE REGN OF THE RM, ON THE                    Bounding Spectnsn vs. SSE    Yes      Yes    ., Yes  Y8s INSTRUMENT/REIAYRACK    &#xb9;1                        REAR SIDE OF STATION AUXllARIES                          Ground Respcnse Spectrum
                                                                                                &#xb9; CONTROL PANFL 14A 19    20      1<SR      0  / ENGINEER SAFTEY SYSTEM      AUXILIARY    633.00 CONTROL RM. NW REGN OF THE RM ON THE      633.00  Yes    Boundrng Spettrum vs. SSE    Yes                Y8S  Yes    Y8$
REAR INSTRUMENT/REtAYRACK                          REAR SIDE OF SAFTEY INJECTION CONTROL                    Ground Response Spectrum
                                                                                      &#xb9;I PAN EI. <Is 0  / WEST RELAY RACK            AUXILIARY    633.00 CONTROL RM, NWREGN OF THE RM. ON THE                    Boundng Spectrum vs. SSE    Yes                Y8S          Yes REAR SIDE OF THE REACTOR COOLANT PUMP                    Ground Response Spectrum
                                                                                                &#xb9; CONTROL PANEL 1&CP 21                        0  /AB EMERGENCY DIESEL          AUXILIARY    587.00 AB EDG RM. MIDDLEN REGN OF THE RM, 5      587.00 N/A    Boundag Spectrum vs. SSE    Yes      Yes        Yes GENERATOR OME-150AB                                FEET E OF TEH RM'S DOORWAY. 10 FEET NW                  Ground Response Spectnsn CONTROL SUBPANEL                                  OF AB EMERGENCY DIESEL 20    IDGCD      0  /CO EMERGENCY DIESEL          AUXILIARY    587.00 CO EDG RM, MIDDLE S REGN OF THE RM, 6    587.00  N/A  Ouurxlng Spectnrn vs. SSE                              No GENERATOR OME-1 SOCO                              FEET SE OF CO EMERGENCY DIESEL                          Ground Response Spectrum CONTROL SUBPANEL                                  GENERATOR &#xb9;1<ME-15OCD. NEAR THE S WALL Certification:
Atl the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. Ali information" Includes each entry and conclusion (whether verified to be seisrnicaily adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
IZ (rk lelg Print or Type Name                          Si nature                          Date                    Print or Type Name                              ature                      Da
 
Walkdown:            . of 10/25/93                                                            DC CO        /IIT 1                                                                                  Page1 of 2 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl  Equip.lD    Rev                                              Fuxu              Room or Raw/Cohmn                                    Capac//7 vs.                Ga vesta  Ancnaf    Interact Equsl No.      No                                              Elev.                                                                  Demand Basis                  OK?      OK?        OK?    OK?
tub 1      0  EQUIP CTRL AND INDIC/AUXIUARY    AUXILIARY 633.00 CONTROL RM, IN THE SE CORNER OF THE RM      633.00  Yes  Bauxleg Spectrum vs. SSE      Yes              Yes      No RELAY PANEL A11                                                                                              Grand Respar>>e Spectrum I A13      0  EQUIP CTRL AND INDIC/AV/0LIARY              633.00 CONTROL RM, IN THE SE CORNER OF THE RM      633.00  Yes  Boundeg Spectrum vs. SSE                        Yos      No RElAY PANEL A13                                                                                              Grourxl Response Spectrum 0  COMPONENT COOLING WA I            AUXILIARY 633.00 CONTROL RM, IN THE MIDDLEWEST PART OF      633.00  Yes  Bouahng Spectrum vs. SSE              Yds                  Yes    Y8$
COMPONENT COOLING WATER                            THE RM, 15 FT SW OF THE UNIT                              Ground Response Spectrum CONTROL PANEL                                      SUPERVISORS DESK 1%I-26      0    / REACTOR PROTECTION            AUXILIARY 633.00 CONTROL RM. ON THE MIDDLE OF THE S                  Y8$  BourxLrg Specaum vs. SSE              Yes                  Yes    Yes CONTROL INPUT CABINET &#xb9;26                          WALL                                                      Ground R          Spectrum 1<1-27      0    I REACTOR PROTECTION            AUXILIARY 633.00 CONTROL RM, ON THE MIDDLEOF THE S                  Y8$  Baurxieg Spectrum vs. SSE      Yes              Yes      Yes    Yes CONTROL INPUT CABINET &#xb9;27                          WALL                                                      Ground Rdspoflsd S tCP        0  CONDENSATE I CONDENSATE          AVXIUARY  633.00 CONTROL RM, IN THE NE PART OF THE RM, 12    633.00  Y8$  Bourx4ng Spectnun vs. SSE            Yds                  Yes    Yes PUMP CONTROL PANEL                                NE OF THE UNIT SUPERVISORS DESK                          Ground Re        Spectrum 20        1CR        0  MISC. EQUIP SUPPORT I            AUXILIARY 633.00 CONTROL RM, tN THE NE REGN OF THE RM,                    1.5 x Boundeg Spectrum vs.            Yes                  Yes    Yes COND ENSATE PANEL REAR                            NEAR THE REAR OF CONDENSATE HEATER                      Rdassdc Mtxfian Centered Roar INST/RElAYRACK                                    LEVEL CONTROL PANEL &#xb9;1.                                        Res      S 0  TURBINE INST. AND GO I DELTA T    AUXILIARY 633.00 CONTROL RM, IN THE N PART OF THE RM, 15'                  Bandeg Spectnun vs. SSE              Yos                  Yes AND UNIT CONTROL PANEL                              OF THE UNIT SUPERVISORS DESK                            Ground Respond>>0 Spectrum 1<FR        0  MISC EQUIPMENT SUPPO I            AUXILIARY 633.00 CONTROL RM, IN THE SW REGION OF THE RM,    633.00  Yes  Baecfeg Spectnun vs. SSE              Yes                  Yes    Yos EMERGENCY FIRE PANEL                              ON THE REAR SIDE OF VENTILATION                          Ground Response Spectrum INSTRUMENT/RElAYRACK                              CONTROL PANEL &#xb9;1-VS 10                          0  MISC EQUIPMENT SVPPO I            AUXILIARY 633.00 CONTROL. RM, IN THE MIDDLEWEST REGION              Y8$  Boundeg Spectnun vs. SSE                                  Yes    Yes CONTROL ROOM EAST REAR                            OF THE RM, 17 FT SW OF THE                                Ground Respanse Spectrum INSTRUMENT/RELAYRACK                              UNITSUPERVISOR'S DESK 0  NUCLEAR INSTRUMENTATI FLUX        AUXILIARY 633.00 CONTROL RM, IN THE NORTH REGION OF THE      633.00  Yos  Boundeg Spectnun vs. SSE      Yos    Yes        Yes      Yes CONTROL PANEL                                      RM, 15 FT NORTH OF THE UNIT SUPERVISORS                  Grand Response Spectrum DESK 12            t&R-2        0  MISC EQUIPMENT SUPPO I            AUXILIARY 633.00 CONTROL RM, IN THE SE REGION OF THE RM,    633.00  Yds  Boundeg Specaum vs. SSE        Yes                        Y0$    Yes GENERATOR PANEL REAR                              NEAR THE REAR SIDE OF MAIM GENERATOR                      Ground Response Spectnun INSTRUMENT/RElAYRACK &#xb9;2                            CONTROL PANEL &#xb9;1%
13              1&Ra        0  MISC EQUIPMENT SUPPO I            AUXILIARY 633.00 CONTROL RM, INMIDDLEEAST REGION OF                  Yos  Boundeg Spectrum vs. SSE                                  Yes    Yes GENERATOR PANEL REAR                              RM. NEAR REAR SIDE OF MAINGENERATOR                      Ground Response Spectrum INSTRUMENT/REIAYRACK B                            COMlROL PANEL  &#xb9;1~  20 FT NE OF REAR PANEL ACCESS DOORWAY
'14            t&RC        0  MISC. EQUIPMENT SUPP /            AUXILIARY 633.00 CONTROL RM. IN THE MIDDLE E REGN OF THE    633.00  Yes  Boundeg Spect/um vs. SSE      Yds GENERATOR PANEL REAR                                                                                                                              Yes        Yos      Yes    Yds RM, NEAR THE REAR SIDE OF MAN                            Ground Response Spectrum INST/RELAYRACK C                                  GENERATOR PANEL &#xb9;1%. NEAR THE E WALL 15            14tsol      0  SAFETY INJECTION/UNIT 1 HOT
                                                                                                                                                                ~
AUXILIARY 633.00 CONTROL RM IUNIT2). IN THE NW CORNER                Y8$  Boundeg Spectrum vs. SSE SHUTDOWN PANEL                                                                                                                                              Yos              Yes OF THE RM.                                                Gfauxl Rdsponsd Spoctnnl 14tls4      0  EQUIPMENT CONTROL AN I            AUXILIARY 633.00 CONTROL RM, IN THE MIDDLEW PART OF THE      633.00  Yds  Bourx4ng Spectrum vs. SSE      Yes    Yes                Yos NUCLEAR INSTRUMENTATION                            RM. 25'W OF THE UNIT SUPERVISORS DESK                    Grand Response SYSTEM PROT CIL 1 CONTROL PANEL 17            1-NIS4ll    0  EQUIPMENT CONT AND I I            AUXILIARY 633.00 CONTROL RM. IN THE MIDDLEW PART OF THE      633.00  Yes  Bauxleg Spectrum vs. SSE NUCLEAR INSTRUMENTATION                            RM. 22'W OF THE UNIT SUPERVISORS DESK                    Grand Respanse Specuum SYSTEM PROT CH. III CONTROL PANEL Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
21~ 9m                                                                                                /z,  ~(/ft Print or Type Name                                Sig  ture                      Date                      Print or Type Name                              g ture                        Date
 
Walkdown:            ., of 10/25/93                                                            DC COO v .SIT1                                                                                .-age 2 of 2 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl  Equip.to    Rev      System/Equpment Descripoon              Floor              Room or Row/Column            Base                Capacity vs.                      Anchor          Equy Na      No                                              Eiev.                                            Eiev.              Demend Bssis                        OK?            OK?
16              1&SR        0  MISC EQUIPMENT SUPPO I          AUXILIARY 633 00 CONTROL RM, N MIDDLEWEST REGION OF                      Boundag Spectrum vs. SSE        Yes  Yos  Yes            Yes NUCLEAR INSTRUMENTATION                          THE RM, ON THE REAR SIDE OF NUCLEAR                      Ground Response Spectrum SYSTEM REAR                                      INSTRUMENTATIONSYSTEM PROTECTION INSTRUMENT/RELAY                                  CHANNEL I CONTROL PANEL &#xb9;1&IS-1 tg                          0  PRESSURIZER/PRESSURIZER          AUXILIARY 633.00 CONTROL RM, N THE NW PART OF THE RM,                    Borndag Spectrum vs. SSE              Yes          Y8$
CONTROL PANEL                                    1$ NE OF THE UNIT SUPERVISORS DESK                      Ground Response Spectrum t&C      0  ROD CONTROL AND INST I          AUXILIARY 633.00 CONTROL RM, IN THE N PART OF THE RM. 15'                Boundag Spectrum vs. SSE        Y8$      Yes      Yes    Yes REACTOR CONTROL RODS                                OF THE UNIT SUPERVISORS DESK                          Ground Response Spectnsn CONTROL PANEL 21              1  RCP      0  REACTOR CootANT I REACTOR        AUXILIARY 633.00 CONl'ROL RM, IN THE NW PART OF THE RM,                  Bounding Spect/um vs. SSE            Yes  Y8$      Y8$    Y8$
COOLANT PUMP CONTROL PANEL                        1$ NW OF THE UNIT SUPEIMSOirs DESK                      Ground Response S 14LPSX-A      0  I REACTOR PROTECTION AND        AUXILIARY 633.00 CONTROL RM, IN THE NE CORNER OF THE RM, 633.00    Y8$  Boundag Spectrum vs. SSE SAFEGUARD ACTUATIONTRAIN A                        ON THE REAR SIDE OF CONDENSATE PUMP                      Ground Response Spectrum AUXILIARYCABNET                                  CONTROL PANEL &#xb9;1CP 14LPSX4I      0  I REACTOR PROTECTION AND        AUXILIARY 633.00 CONTROL RM, IN THE MIDDLES REGN OF THE 633.00      Yes  Boundag Spectrum vs. SSE        Yes  No  Yes SAFEGUARD ACTUATIONTRAIN B                        RM, ON THE REAR SIDE OF MOVABLEINCORE                    Ground Response Spectrum AUXILIARYCABINET                                  INSTRUMENTATIONPANEL &#xb9;144FX 24                          0  ELECTRICAL DISTRIBUT I STATION  AUXILIARY 633.00 CONTROl. RM, IN THE SE PART OF RM. 2Z SE          Yes  Boundag Specuum vs. SSE              Yes                  Yos AUXILLIARIESCONTROL PANEL                        OF THE UNIT SUPERVISORS DESK                            Ground Res        Spectrum 25              tAG        0  STEAM GENERATION I S.G. AND      AUXILIARY 633.00 CONTROL RM, IN THE NE PART OF THE RM, 15'33.00          Boundag Specrrum vs. SSE AFW PUMP CONTROL PANEL                            NE OF 1HE UNIT SUPERVISOR'S DESK                        GfoufKI Res      S poet/lal 1.SR2      0  MISC EQUIPMENT SUPPO I          AUXILIARY 633.00 CONTROL RM. N THE MIDDLEOF THE EAST        633.00        Boundag Spectrum vs. SSE                  Yes            Yes 27              1<R3        0 STATION AUXIUARIESREAR INSTRUMENT/RELAYRACK &#xb9;2 MISC EQUIPMENT SUPPO I          AUXILIARY 633.00 REGION OF THE RM, ON THE REAR SIDE OF STATION AUXILIARIESCONTROL PANEL I CONTROL RM, N THE MIDDLEOF THE EAST
                                                                                                                      &#xb9; ~    633.00 Ground Response Spearum Boundag S pearum vs. SSE                  Yos      Yes    Yos STATION AVXIUARIESREAR                            REGION OF THE RM, ON THE REAR SIDE OF                    Grand Response Spearum INSTRUMENT/REALYRACK &#xb9;3                                                              &#xb9; STATION AUXILIARIESCONTROL PANEL I 4A 26    20      1<R4        0  MISC EQUIPMENT SVPPO I          AUXILIARY 633.00 CONTROL RM, IN THE MIDDLEOF THE EAST      633.00        Boundag Speci/um vs. SSE                                  Y8$
STATION AUXILIARIESREAR                          REGION OF THE RM, ON THE REAR SIDE OF                    Gfoulld Response S pectnsn INSTRUMENT/RElAYRACK &#xb9;4                          STATION AUXILIARIESCONTROL PANEL    &#xb9;t~
20                  0  MISC EQUIPMENT SUPPO I          AUXILIARY 633.00 CONTROL RM. IN THE MIDDLEOF THE WEST                    Boundag Spearum vs. SSE                    Yes            Yes NUCLEAR NSTRVMENTALSOURCE                        WALINEARTHE REAR OF ESSENTIAL                          Gfound Response Spoctlum RANGE N21 INSTRUMENT/RELAY                        SERVICE WATER CONTROL PANEL &#xb9;ICCW RACK 1-TRB        0  MISC EQUIPMENT SUPPO I          AUXILIARY 633.00 CONTROL RM. N THE MIDDLEEAST REGION                      Boundag Spearum vs. SSE                                    Yes TURBINE PANEL REAR                                OF THE RM, 10 FT EAST OF CONTROL                        Ground Response Spectrum INSTRUMENT/RELAYRACK 'P                          PANEL&#xb9;14A. NEAR THE EAST WALL 31              1-TRD        0  MISC EQUIPMENT SUPPO I                    633.00 CONTROL RM. IN THE EAST REGION OF THE                    Boundag Spearurn vs. SSE        Yes  Yes          Yes    Yes TURBINE PANEL REAR                                RM. NEAR THE REAR SIDE OF CONTROL                        Ground Response Spectrum INSTRUMENT/RELAYRACK 'D'                          PANEL &#xb9;1-T, 25 FT NE OF REAR PANEL ACCESS DOOR. 5 FT W. OF E WALL 1-TRE          MISC EQUIPMENT SUPPO I          AUXILIARY 633.00 CONTROL RM, IN THE MIDDLEEAST REGION                Yos  Boundag Spectrum vs. SSE          Yes Yes TURBINE PANEL REAR                                OF THE Ri/L NEAR THE REAROF CONTROl                      Ground Response Spectrum INSTRUMENT/RElAYRACK%                              PANEl&#xb9;1 T, 4 FT EAST OF CABNET &#xb9;14LPC4l-
: 7. NEAR THE EAST WALL Certification All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief; correct and accurate. "Allinformation includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or Type Name                                Si nature                        Date                    Print or Type Name                              Signa                  Date
 
. 0 Waikdown:              f 10/25/93                                                                    DC CO            T1                                                                                            ',age 1 of 2 SCREENING VERIFICATI~.                      ATA SHEET (SVDS)
Equp.lo    Rav      System/Equipmant Dscci'pton                                        Room or Roar/Cohmn                          Base                                        Csp >  Cavssts Anchor        Equsr No.      No                                                                                                                    Elev.                                      Domsrxr7  OK7    OK7            OK7 1      20  1+CRA-1      0  EQUIP CTRL AND INDIG I CONTROL    AUXILIARY        CTRL RM AIR COND RM, 3 FT NORTH OF                                          1.5 x Boundstg Spectrum vs.      Yes                    Yos    Yes ROOM AR HANDLINGS UBPANEL                          CONTROL RM VENTltATIONNORTH AIR                                            Rearrst(C Median Centered FbOr
                              &#xb9;1                                                CONDmoNING UNIT &#xb9;14IVACRA-t.AT THE                                                  Response Spectra CENTER OF THE NORTH 2      20  t*CRA-2      0  EQUIP CTRLAND INDICICONTROL      AVXIUARY        CTRL RM AlR COND RM. 3 FT SOUTH OF                                          1.5 x Boundng Spectrum vs.    . Yos    Yos                  Yes ROOM AIR HANDLINGSVBPANEL                          CONTROL RM VENTILATIONSOUTH AIR                                            Reasstic Mecran Centered Floor
                              &#xb9;2                                                CONDITIONING UNIT &#xb9;14tvutCRA.2, AT THE                                              Response Spectra CENTER OF THE SOUTH 3      20    14SI-1      0  STEAM GENERATING I STEAM          AUXILIARY 612.00 E MAIN STM STOP ENCL ON SO. WALLIN SE                                        Boundeg Spectrum vs. SSE                Yas    Yes    Yes GENERATORS &#xb9;1 AND &#xb9;4 LOCAL                        CORNER OF RM. 3 FT FROM EAST WALL                                            Ground Response Spectrum SHUTDOWN STATION 4      20    14SI-2      0  STEAM GENERATING I STEAM          AUXILIARY 591.00 STARTUP BLOWDOWN FLASHTANKRM, IN THE                          609.00  Yes    soundly Spectrum vs. SSE        Yes    Yes          Yes GENERATORS &#xb9;2 AND &#xb9;3 LOCAL                        NE CORNER OF THE RM, MOUTED ON THE                                          Grourxl Response Spectrum SHUTDOWN STATION                                  NORTH WALL5 FT ABOVE THE FLR 5      20    14SI4      0  PRESSURIZER I REACTOR            AUXILIARY        HALLWAY.IN THE HALLWAY,WEST OF THE                            587.00  Yes    Boundvtg Spec(rum vs. SSE        Yes    Yes          Yos    Yes COOlANT SYSTEM CHARGING AND                        REFUELING WATER PUIVFICATION PUMP RM.                                        Ground Response Specfrurl LETDOWN LOCAL SHUTDOWN                            NEAR THE NORTH WAU ON THE EAST WALL STATION 6      20    1LSW            EQUIP CTRL AND INDIC I REACTOR                    HALLWAY.IN THE MIDDLEEAST REGION OF                          587.00  Yas    Bourxsng Spectrum vs. SSE                Yes          Yas CoolAMT SYSTEM                                    THE HALLWAY,IN THE HALLWAYWEST OF                                            Ground Response Spectrum TEMPERATURES AND STEAM                            THE REFUELING PURIFICATION PUMP RM, ON GENERATORS LOCAL SHUTDOWN                          THE EAST STATION 7      20    14SI4      0  EQV(PMENT CON'rRot. AN IRC        AVXILIARY 612.00 E MAINSTEAM STOP ENCLOSURE, ON S WALL 609.00                          Yes    Bcunorny Spectnm vs. SSE                        Yes    Yes LOOPS &#xb9;184 TEMPS, SG'S&#xb9;1 8 4                      IN SE CORNER OF RM, 7'ROM E WALL                                              Gnxsxl Response Spectrum PRESS LOCAL SHUTDOWN STATICM 8      20    MSI4X        0  EQUIPMENT COMTROL AN I LOCAL      AUXILIARY        E MAINSTEAM STOP ENCLOSURE. IN THE NE                                        Boundstg Spectrum vs. SSE                Yos          Yas SHUTDOWN STATION &#xb9;SX                              CORNER OF RM.                                                                Ground R          S 9      20      I LSI4      0  EQU(PMENT CONTROLANIRC            AVXIUARY  591.00 STARTUP BLOWDOWN FLASHTANKRM, IN NW                            609.00  Yes    Boundrng Spacuum vs. SSE                Yes    Yos    Yes    Yas LOOPS 2 8 3 TEMPS, SGS &#xb9;2 8 3                      CORNER OF RM, MOUNTED ON THE N WALL, 1'                                      Ground Response Spectrum PRESS LOCAL SHUTDOWN STN                              OF LOCAL SHUTDOWN STATION &#xb9;LSI-2, S ABOVE THE FLR.
10    20    1MI4X          EQUIPMENT CONTROL AN I LOCAL      AVXIUARY        NORMAL BLOWDOWN FlASHTANKRM, IN THE                            633.00 Yes    Bounarng Spectrum va SSE                              Yes SHUTDOWN STATION &#xb9;6X                              NW CORNER OF THE RM,            3'E  OF THE IU&#xb9;s                              Ground Response Spectrum ENTRANCE DOORWAY. 4'ABOVE THE FLR 11    20    I 4IRI    0  NUCLEAR INSTRUMENTATINl          AVXIUARY        REACTOR CABLE TUNNEL. QD &#xb9;1, 2(7 SW OF                        587.00  N/A    1.5 x Bounchng s pecuum va              Yes    Yos AMP          WIDE RANGE RADIATION                              REACTOR CABLE TUNNEL QUAD &#xb9;1, N OF FIRE                                    Reaiisdc Median Centered Fkor AMPUFIER                                          DOOR 14)R4 UX333, NEAR CONT            WAU6'BOVE Response Spectra FLR. INST DWG 14552C.
12    20    1+RI      0  NUCLEAR INSTRUMENTATI Nl        , AUXILIARY        REACTOR CABLE TUN HEIQD&#xb9;1 ~ 30'W OF                                          Sounds(9 Spectrum vs. SSE        Yos    Yos          Yes AMP            SOURCE RANGE RADIATION                            REACTOR CABLE TUNNEL QUAD &#xb9;1, N FIRE                                          Ground Response Spectrum DETECTOR Ntu-23 AMPUFIER                          DOOR&#xb9;1, RM433.NEARCOMTWAU FLR.                              4'BOVE 13    20    14(RS23.      0  NUCLEAR INSTRVMENTATINl          AUXIUARY                                                                        609.00  Yes    Boundstg Spectrum vs. SSE                Yes                  Yes ISOL          SOURCE RANGE SIGNAL ISOLATOR                                                                                                    Ground Re          Spectrum 14    20    14(RI    0  NUCLEAR INSTRUMENTATI            AUXILIARY                                                                      609.00  Yas    Boundrng Spectruni vs. SSE      Yes                  Yes    Yes PRCSR          NUCLEAR INSTRUMENTATION                                                                                                        Gnxnd Response S pecuum SOURCE RANGE SIGNAL PROCESSOR Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
(~('rint or T pe Name                                Si nature                                Date                              Print or T pe Name                                  n  ure                  Date
 
Walkdown:                f 10/25/93                                                              DC CO              1                                                                          'age2of2 SCREENING VERIFICATIIIr4DATA SHEET (SVDS) item  Eq. CI  Eqrsp.to            System/Equipment Deccriptron      Busdrng.                  Roorrl or RowCoasnn            Bass                                      Caps    Ceveats            Equip No                                                                                                            Elev.                                    Demand?  OK?    OK?        OK?
15    20      t<CP        0  NUCLEAR SAMPLING I NUCLEAR          AUXILIARY 587.00 NUCLEAR SAMPUNG RM, 10 FT SW OF THE      587.00  N/A    1.5 x Boundlg Specuum vs. Yos      Yes                Yes SAMPLING SYSTEM CONTROL                              SAMPLING SINK, ON CONTROL RM PANEL  &#xb9;I-                ROSMc Median Centered Floor PANEL                                                SCP                                                          R          S 16    20      1.TFP      0  EQUIP CTRLAND INDICITURBINE          TURBINE  591.00 TB DRIVEN AUX FDWIR PMP                  591.00  Yes    Brxstdstg Spectrum vs. SSE  Yos      Yos        No DRIVEN AUXIUARYFEED PUMP                                                                                      Grrxstd Response Spectnsn SUBPANEL 124FP-12      0  EQUIP C'rRL AND INOIC I SPENI'UEL 50900  SPENT FUEL PIT HEAT XCHGR RM, IN SE                      Boundng Spectrum vs. SSE      Yes    Yos                Yos PIT SUBPANEL                                    CORNER OF RM, 10 FT SW OF THE RM'S                      Ground Response Spectnsn ENTRANCE DOOR NEAR THE So. WALL Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                                  Si nature                      Date                    Print or T pe Name                              n  ure              Dae
 
Walkdown:              of 10/25/93                                                            DC  CO,T1                                                                                                        vage1 of 2 SCREENING VERIFICAli-.o DATA SHEET (SVDS)
Eq. CI  Equip.lo  Rev                                              FXOr                                                                                                          Cap +  Caveats            Equip Na        No                                              Etev.                                                                                                        Demand?  OK?    OK?        OK?
20    14CRA    1      FQUIP CTRL AMD WDICICONTROL                650.00  CTRL RM AIR COND RM. 3 FT NORTH OF                                    1.5 x Bourxrng Specuurn vs.                            Yes    Yss ROOM AIR HAMDUMGSUBPANEl                          CONTROL RM VEHTIIATIONNORTH AIR                                      Resrrssc Median Cantered Floor
                                &#xb9;I                                                CONDmoNING UNIT &#xb9;14rtf~RA.1, AT THE                                        Rsspcxee S pectra CENTER OF THE NORTH 20    1&CRA-2      0  EQUIP CTRL AND WDICICONTROL      AUXIUARY  650.00  CTRL RM AIR COND RM. 3 FT SOUTH OF                                    1.5 x Bouixtng Specuum vx                  Yes  Yes  Yes    Yss ROOM AIR HANDLWGSUBPAMEL                          CONTROL RM VENTILATIOHSOUTH AIR                                      Resrrsdc Median Cantered Floor
                                &#xb9;2                                                COMDITIOMWGUNIT &#xb9;14IV~RA-2, AT THE                                          Response Spectra CENTER OF THE SOUTH 20      14SI-I    0  STEAM GENERATWG I STEAM          AUXIUARY  612.00  E MAINSTM STOP ENCI ON So. WALLW SE                            Yes    Bounds Spectrum vs. SSE                          Yes  Yes    Yss GENERATORS &#xb9;1 AND &#xb9;4 LOCAL                        CORNEROFRM,SFTFROMEAST        WAll                                  Ground Response Spectrum SHUTDOWN STATION 20      14.SI-2    0  STEAM GENERATING I STEAM        AUXIUARY  591.00  STARTUP BLOWDOWN FIASHTAMKRM, IM THE                          Yes    Bourxbng Spectrum vs. SSE          Yes                Yes    Yes GENERATORS &#xb9;2 AMD &#xb9;3 LOCAL                        NE CORNER OF THE RM, MOVTED ON THE                                    Ground Response Spectrum SHUTDOWN STATION                                  NORTH WAUSFTABOVETHEFLR 20      MS'        0  PRESSURIEERI REACTOR                      587.00  HALLWAY,IN THE HALLWAY,WEST OF THE                              Yes  Boundsrg Spectnrn vs. SSE                  Yes  Yes  Yes
                                                                                                                                                        ~
COOLANT SYSTEM CHARGWG AND                        REFUEUNG WATER PURIFICATION PUMP RM.                                  Ground Response Spectrum LETDOWN LOCAL SHUTDOWN                            NEAR THE NORTH WALLOH THE EAST WALL STATION 0  EQUIP CTRL AND WDIC I REACTOR              58T.OO  HALlWAY,IM THE MiDOLE EAST REGION OF                                              Spectrum vs. SSE                    Yes  Yes    Yes COOLANT SYSTEM                                    THE HALLWAY,IN THE HALLWAYWEST OF                                    Ground Response Spectrum TEMPERATURES AMO STEAM                            THE REFUEUNG PURIFICATION PUMP RM. ON GENERATORS LOCAL SHUTDOWN                          THE EAST STATION 0  EQUIPMENT CONTROL AM I Rc        AUXIUARY  612.00  E MAINSTEAM STOP ENCLOSURE, ON S WALL                          Yes    Bounosv? Spectrum vs. SSE                Yes        Yes    Yes
                                                        &#xb9;
                                                                                                                                                          ~
LOOPS &#xb9;1 6 4 TEMPS, SG'S I 6 4                    W SE CORNER OF RM,? FROM E WALL                                      Ground Response Spectrum PRESS LOCAL SHUTDOWN STATIOH 20      14SI6X      0  EQUIPMENT CONTROL AN I LOCAL    AVXIUARY  621.00  E MAINSTEAM STOP ENCLOSURE, W THE NE                            Yes              Spectrum vs. SSE              Yes  Yes  Yes    Yes SHUTDOWN STATION &#xb9;5X                              CORNER OF RM.                                                          Ground Res 20      14SI6      0  EQUIPMENT CONTROL AN I Rc        AUXIUARY  591.00  STARTUP BLOWDOWN FIASHTANKRM. IN NW                            Yes    Boundstg Spacuum vs, SSE                        Yes  Yes LOOPS263TEMPS, SGS&#xb9;263                            CORNER OF RM, MOUNTED ON THE H WAlL,                  1'OF Ground Response Spectrum PRESS LOCAL SHUTDOWN STN                                LOCAL SHUTDOWN STATION &#xb9;LSI-2.
THE FLIL                                5'BOVE 10                          0  EQUIPMENT CONTROL AN I LOCAL    AUXIUARY  633.00  NORMAL BLOWDOWN FLASHTANKRM, IN THE                            Yes    Boundstg Spectrum vs. SSE        Yas    Yes  Yes  Yes    Yes SHUTDOWN STATIOH &#xb9;8X                              NW CORNER OF THE RM. 3'E  OF THE Rhrs                                Ground Response Spectrum ENTRANCE DOORWAY. 4'BOVE THE FLR.
1&RI.21      0  NUCLEAR IMSTRUMENTATI Nl        AUXILIARY 598.00  REACTOR CABLE TUNNEl QD &#xb9;I, 20 SW OF                                  1.5 x BoundsX? Spectrum vs.              Yes    Yes  Yes    Yes AMP          WIDE RANGE RADIATION                              REACTOR CABLE TUNNEL QUAD &#xb9;I, N OF FIRE                              R$ $ 5strc Msrfian Cantered Fkor AMPUFIER                                          DOOR14?R~.NEARCONTWALI                                                      Response Spectra FLIL WST DWG 16552C.              6'BOVE 12            14IRI-23. 0  NUCLEAR INSTRUMENTATI Nl        AVXILIARY  596.00 REACTOR CABLE TVNNEI QD &#xb9;I, 30'W OF                            Yes    Bounding Spactnm vs. SSE                        Yes  Yes AMP            SOURCE RANGE RADIATION                            REACTOR CABLE TUNNEL QUAD &#xb9;I, M FIRE                                  Gnxstd Response Spectrum DETECTOR NRI-23 AMPUFIER                          DOOR &#xb9;1, RM633, NEAR CONT WAU HR.                        4'BOVE 14IRI    0  NUCLEAR INSTRUMENTATI Nl        AUXILIARY  598.00                                                                Yes    Boundrng Spectnsn vs. SSE                        Yes  Yes ISOL          SOURCE RANGE S IGMALISOIATOR                                                                                            Ground Response Spectrum 14            14tru    0  NUCLEAR WSTRUMENTATI            AUXILIARY  596.00                                                                        Boundng Spectnsn vs. SSE                        Yss  Yes    Yes PRCSR          NUCLEAR IHSTRVMENTATIOH                                                                                                  Ground Response Spectrum SOURCE RANGE SIGNAL PROCESSOR Certification All the information contained on this Screening Verificabon Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                              S'ature                          Date                                Print or T pe Name                                  n  ure                Date
 
. ~
Walkdown: Ml          .I 10/25l93                                                            DC COO              1                                                                              ~
Ega  vl SCREENING VERIFICATI                  TA SHEET (SVDS)
Equip.lD    Rev                                    Busdeg. Floor            Room or Rowlcoirsnn            Base                  Capacriii vs.        Cap e    Caveais              Equip No.      No                                              Elev.                                            Eiev.                Demand Basis          Dam atxl?  OK?                  OK?
15    20    1<CP        0  NUCLEAR SANlPUNG I NUCLEAR        AUXILlARY        NUCLEAR SAMPUNG RM, 10 FT SW OF THE                      1.5 x Bxsxxfsvg Specrnsn vs. Yes      Yes  Yes    Yes  Yes SAMPLiNG SYSTEM CONTROL                            SAMPLlNG SINK, ON CONTROL RM PANEL $ 1-                ReaTssc Median Ceniered Floor PANEL                                              SCP                                                          Response S      a 16    20      1.TFP      0  EQViP CTRl. AND iNOic I TVRBINE    TURBINE  59L00  TB DRivEN AVXFDWTR PMP                    59LOO  Yes    Boundng Specrrum vs. SSE                Yes  No      No DRIVEN AUXll.lARYFEED PUMP                                                                                  Ground Response Specirum SVBPANEL 17    20  12.SFP-12    0  EQViP CTRL AND iNDIC I SPENT                      SPENT FUEL PIT HEAT XCHGR RM, iN SE                      Boundog spectrum vs. ssE        Yes      Yes  Yes    Yes FUELPITSVBPANEl.                                  CORNER OF RM, 10 FT SWOF THE Rhrs                        Grourxl Response Specirum ENTRANCE DOOR. NEAR THE So. WALL Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowtedge and betief, correct and accurate. "Allinformation" includes each entry and conclusion
{whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team {SRT) are required; there shoutd be at teast two on the SRT. All signatories should agree with atl the entries and conclusions. One signatory should be a licensed professional engineer.)
(
Print or T pe Name                                Si nature                      Date                    Print or T pe Name                                n  ure                  Dae
 
Walkdown.
Eq CI
              ~
Equp. Io  Rev of 10/29/92 Srsiem/Equpmera Oesoopiaal              Fioor DC CO        NIT 1 SCREENING VERIFICATION DATA SHEET (SVDS)
Room or Rorr/Coa/mn Page 1of1 Capaoar vs.          Cap >    Caveats                  Equip No.      No                                              Elev.                                                              Oemexl Basis        Demarxrr    OK?      OK?            OK?
1-SV.I 22%  0    CCW/ CONTAINMENTVENT FAN      CONTAINMENT 625.00  HV<EQ-1 FAN ROOM                                Yes              BS                Yes                                Yes HV4:EQ-1 MOTOR AIR COOLER                                                                                          GRS CCW OUTLET SAFETY VALVE I -SV-122<  0    CCW/CONTAINMENTVENT FAN      CONTAINMENT 625.00  HV<EQ-2 FAN ROOM                                                  BS HVCEQ-2 MOTOR AIR COOLER                                                                                            GRS CCW OUTLET SAFETY VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
I ay~        ws Print or Type Name                            Signature                        Date                  Print or Type Name                            Signature                      Date
 
Walkdown: 'A            of 10/04/93 and 10/11/93                                                  D.C.          Unit 1                                                                                  Page  1  of 9 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq.      Equip, ID    Rov              sf st<<ll/Equipmont Doscfsiten                          F ker Eiov. Room or Rcw/Cobmn      Base Eiev. <4{/?    Capacity  vL      Cap >  Csvests        Interact    Equip No                                                                                                                                D<<nand Basis        Demand?  OK?            OK?      OK?
14iov-tuba        0  STARTING AIR SYST I PILOT OPERATED 4 WAYVALVE        AUXILIARY                  AB EDG RM. IN THE SE REGN    58?.OO    N/A    Judgment vs.                NIA  Yos      Yes FOR AIR START XRVS FOR DIESEL ENGINE                                            OF THE RM. ON THE SE ENO                      Resristic M<<fisn OF THE DIESEL END OF AB                        Centered Fker EDG                                          R          S      s I+OV-t&D          0  STARTING AIR SYST I PILOT OPERATED 4 WAYVALVE        AUXILIARY                  CD EDG RM,                  587.00    N/A    Jud{plont vs.        Yes          Yos
* Yos FOR AIR START XRVS FOR DIESEL ENGINE                                                                                          Resssdc M<<gsn Centered Boor Res    seS        s 1 AT 101.AB      0  DIESEL COMBUSTION      A/ABEMERG DIESEL AIR INTAKE  AUXILIARY                  AB EDG RM. IN NE REGN OF    587.00    N/A    Judgment vs.        Yos          Yes      Yes SILENCER                                                                        THE RM, 10'E OF DIESEL                        Resrrsdc M<<fisn END OF AB EOG. 1{7 ABOVE                      Centered Fker FLR                                          Re          S      a 0    14?T-1014    0    0  DIESEL COMBUSTION A I CD EMERG DIESEL AIR INTAKE    AUXILIARY                  CO EDG RM. 10FT NE OF THE    587.00    N/A    Judg/sent vs.              NIA SILENCER                                                                        DIESEL END OF CD EOG..                        Realistic M<<fisn 11FT ABOVE THE FLR                            Centered Fker R          S 14?T-I 1 2uta    0  DIESEL LUBE OIL/ABEMERG DIESEL FULL FLOW LUBE        AUXILIARY        579.00    AB EDG LUBE OIL PIT, IN THE  587.00    N/A    Judgment vs.                N/A  Yos 0 IL FILTER                                                                    NE CORNER OF THE PIT                          Resristic M<<San Centered Fker Re          S 1&T 112ND          0  DIESEL LUBE OIL I CD EMERG DIESEL FULL FLOWLVBE      AUXILIARY        579.00    CD EDG LUBE OIL PIT, IN NE              NIA    Judgment vs.        Yes          Yos                Yes OIL F ILTER                                                                    CORNER OF PIT, 5FT NE OF                      Resssuc M<<san CD EMERG OSL LUB SUMP                          Cantered Floor TANK$ 142T-11&CO, NEAR                      Response Spectra FLR 0    1427-tt&ASI        0  DIESEL LUBE OIL I AB EMERG DIESEL FULL FLOW LUBE    AVXILNRY        579.00    AB EDG LUBE OIL PIT.        587.00    N/A    Judgment vs.        Yos 0 IL STRAINER 1                                                                                                              Ressstic M<<fisn Centered Fker Re          S      a 1&T-1 13-AB2      0  DIESEL LUBE OIL/AB EMERG DIESEL FULL FLOWLUBE        AUXILIARY        579.00    AB EDG LUBE OIL PIT,        587.00    N/A    Judgmera vs.                NIA  Yes OIL STRAINER 2                                                                                                                Res/istic M<<fisn Cantered Fker Re          S 0    143T-11&Col        0  DIESEL LUBE OIL I CD EMERG DIESEL LUBE OII. FULL    AUXILIARY        579.00    CD EDG LUBE OIL PIT,        587.00    N/A    Judgiilenl vs.      Yes    NIA  Yes                Yes FLOW STRAINER 1                                                                                                              Reaasdc Meden Centered Boor R          8 10    0    14lT 113<02        0  DIESEL LUBE OIL/ CD EMERG DIESEL FULL FLOW LUBE      AUXILIARY                  CD EDG RM,                  587.00    N/A    Judgment vs.        Yes          Yos                Yes OIL STRAOIER 2                                                                                                                Rearisdc Median Centered Boor Re          S      s 147T 118-AB      0  DIESEL LUBE OIL I AB EMERG DIESEL BYPASS LUBE OIL    AUXILOIRY        579.00    AS EOG LUBE OIL PIT,        587.00    N/A    Judgment vs.                N/A  Yes FILTER                                                                                                                        Resristic M<<fisn Centered Fker Response Spectra 12            14?T-11  &CD    0  DIESEL LUBE OIL/ CD EMERG DIESEL BYPASS LUBE OIL    AUXILIARY        579.00    CD EDG LUBE OIL PIT,          587.00    NIA    Judgrrl ant vs.      Yos    NIA  Yes FiLTER                                                                                                                        Resiletic M<<fisn Centered Boor R          Spectra Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatonj shoukt be a licensed professional engineer.)
Print or T pe Name                                    'gnature                      Date                        Print or Type Name                                Si nature                    Date
 
Walkdown: I/            of 10/04/93 and 10/11/93                                                    D.C.. Unit        1                                                                        Page2of9 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq.      Equip. ID    Rev              System/Equipmont Oescnption                            Fker Elev.      Roan or Raw/column                  Capacity vs.                          Irserect Equp CI                      No                                                                                                                        Dom<<xl Basis                            OK?    OK?
13    0    14T-143utBI        0  DIESEL STARTING  AIR/ABEMERG DIESEL CONTROL          AUXILIARY      581.00  AB EDG RM,                    N/A      Judgment vs.        Yos N/A    Yes    Yes AIR DRYER 1                                                                                                          Rearrstic M<<fan Centered Fker Re          S    a 14          14T 143JI82        0  DIESEL STARTING AIR /AB EMERG DIESEL CONTROL                          581.00  AB EDG RM,                    N/A      Judgment vs.                            Yos AIR DRYER 2                                                                                                          Reatisdc M<<fen Centered Fker R          Spectra 15    0    147-143401        0  DIESEL STARTING AIR / CD EMERG DIESEL CONTROL        AUXILIARY      587.00  CD EOG RM,                              Judgment vs.                    Yes    Yes    Yes AIR DRYER 1                                                                                                          ReaNstic M<<futn Centered Fker Res        S    8 16    0    14T-1 434 D2      0  DIESEL STARTING AIR/CD EMERG DIESEL CONTROL          AUXILIARY      581.00  CD EDG RM.                    N/A      Judgment vs.                            Yos AIR DRYER 2                                                                                                          Reatistc M<<fian Centered Fker Response S 17            14T-I 444B        0  DIESEL FUEL ON. /AB EMERG DIESEL FUEL OIL            AUXILIARY      587.00  AB EDG RM,                              Judgment vs.            N/A            Yes    Yes TRANSFER FILTER                                                                                                      Realistic M<<fian Centered Floor Response S 18            14T 144&0        0  DIESEL FUELOIL/CDEMERG DIESEL FUEL OIL                AUXILIARY      587.00  CD EOG RM,                              Judgment vs.        Y8$        Yes    Yes    Yes TRANSFER FtLTER                                                                                                      ROONsdc  M<<fian Centered Boor Res    se S      a 19                                STARTING AIR/1 AB DIESEL GEN TUBE TRACK              AUXILIARY      587.00  AB EDG RM,                    N/A      Judgment vs.        Yes        Yes    Yes    Yes Roarisdc Median Centered Fker Response S 1-TT4GCO            STARTING AIR I 1 CO DIESEL GEN TUBE TRACK            AUXILIARY      587.00  CO EDG RM.                    N/A      Judgfn ant VL      Yes        Yos    Yes    Yes Realistic Median Centered Floor Response S        8 21          14T-106%DI        0  DIESEL FUEL OIL I CD EMERG DIESEL FUEL OIL            AUXILIARY                CD EDG FUEL OIL TRANSFER      Yes    Boundng Spoctnsn            Yos    Yes    Yes    Yes TRANSFER PUMP 1                                      AUXILIARY                PUMP RM.                              vs. SSE Ground OIL Re          S I 4T-106CD2      0  DIESEL FUEL OIL /CD EMERG DIESEL FUEL OIL            AUXILIARY                CD EOG FUEL OIL TRANSFER      Y8$    Boundng Spectrum        Yes Yes            Yos    Yos TRANSFER PUMP 2                                                                PUMP RM.                              vs. SSE Ground Re          S 14T.11140        0  DIESEL LUBE OIL/CD EMERG DIESEL LUBE OIL BEFORE                      579 00  CD EDG LUBE OIL PIT, IN THE  Yes    Boundng Specuum        Yes                Yes    Yos ANO AFTER PUMP                                                                MIDDLE E REGN OF THE PIT.              vs. SSE Ground 4FT E OF LUBE OIL TANKS 1          Response Spectrum OT 116CD, NEAR FLR.
24            14T-I 174%      0  DIESEL LUBE ON./AB EMERG DIESEL LUBE OIL HEATER      AUXILIARY      579.00  AB EDG LUBE OIL PIT.                Boundng Speci/um            Yos            Yes    Yos QT-I 1 AS PUMP                                                                                                        vs. SSE Ground Response S 25            14T-11740            DIESEL LUBE OIL/CD EMERG DIESEL LUBE OIL HEATER      AUXILIARY      51900    CD EOG LUBE OIL PIT                  Boundng Spectnsn            Yos    Yes    Yos QT-116CD PUMP                                                                                                        vs. SSE Ground R            8 147-11948            DIESEL LUBE      / AB EMERG DIESEL LUBE OIL FILTER    AUXILIARY      57900    AB EDG LUBE OIL PIT,                Boundng Spectrum            Yos            Yos (QT-116AB) PUMP                                                                                                      vs. SSE Ground Re          Spectrum Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
i 7 / f tc,(at 5 Print or T pe Name                                  Signature                        Date                      Print or T pe Name                        Si nature                  Date
 
Walkdown: ti            of 10/04/93 and 10/11/93                                                  D.C., Unit          1                                                                        Page 3 of 9 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq.        Equip. ID    Rev              System/Equipment  escnpuon                        Finer Elev,                                            Capacrty vs. Cap>  Caveats        lAteiaa  Equei CI                      No                                                                                                                        Demand Basis    Demand?  OK?    OK?    OK'7    OK'7 27    5      14T-1194D          0  DIESEL LUBE OIL/ CO EMERG DIESEL BYPASS LUBE OII. AUXILIARY      579.00    CD EDG LUBE OIL PIT,        587.00 Yes Boundrtg Spectrum                            Yes    Yos FB.TER (QT-1184D) PUMP                                                                                                vs. SSE Ground Response Spearum 14T-1 30461            DIESEl JACKET WATER I AB EMERG DIESEL JACKET        AUXILIARY                                            58r.0O Yes Boundstg S pecuum      YB$    Yos  Yes              Yos WATER PUMP 1                                                                                                          vs. SSE Ground Response Spectrum 14T-130AB2            DIESEL JACKET WATER I AB EMERG DIESEL JACKET      AUXiltARY                AB EDG RM,                  587.00 Yes Boundstg Spectrum      Y8$          Yes      Yes    Yes WATER PUMP 2                                                                                                          vs. SSE Ground Response S poarum 30    5    14T-1304D1        0  DIESEL JACKET WATER!CD EMERG DIESEL JACKET        AUXILIARY                CD EDG RM,                  587.00 Yes Boundstg Spectrum      Yes          Yes              Yes WATER PUMP 1                                                                                                          vs. SSE Ground Re        Spectrum 31    5    14T 130402        0  DIESEl JACKETWATERICO EMERG DIESEL JACKET          AUXILIARY                CO EDG RM.                  58r.oO Yes Boundstg Spearum      Y8$          Yes              Yes WATER PUMP 2                                                                                                          vs. SSE Ground Response Spectrum 32    5      14T-1 35@LB      0  DIESEL JACKET WATER I AB EMERG DIESEL AUX          AUXILIARY                AB EDG RM.                  587.00 Yes Boundng Speansn        Y8$          Y85 JACKET WATER PUMP                                                                                                    vs. SSE Ground Response Spectrum 14T 13540              DIESEL JACKET WATER I CD EMERG DEISEL AVX          AUXILIARY                CD EOG RM,                  587.00 Yes Boundrtg Spearum      YB$          Yes              Yos JACKET WATER PUMP                                                                                                    vs. SSE Ground Response Spectrum MV-12OAS          0  DIESEL Sl'ARTING AIR I 1-XTc~t AND 1-XTC402        AUXILIARY                AB EMERDSLGENRM            58T.OO Yes Boundng Speansn        Y8$    Yes  NIA      Yes    Yes CONTROL AIR SAF HYVALVE                                                                                              vs. SSE Ground Response S 35      7    14V-12040          0  DIESEL STARTING AIR I 1-XTC~ AND 1-XTC407          AUXILIARY                CD EMER DSl GEN RM          587.00 Yes Boundeg Spectrum      Yes    Yes            Yes CONTROL AIR SAFETY VALVE                                                                                              vs. SSE Ground Response S 1 <V-139-AB      0  DIESEl STARTING AIR I AB EMERG DIESEL STARTING    AUXILIARY                AB EMER DSL GEN RM          587.00 Yes Boundary Spectrum                            Yes    Yos AIR TO TURBOCHARGER SAF HY VALVE                                                                                      vs. SSE Ground Re      e Spectrum 37      7    1.SV.139-CD        0  DIESEl STARTING AIR I CD EMERG DIESEL STARTING    AUXILIARY                CD EMER DSL GEN RM          58T.OO Yos Boundeg Spectrum AIR To TURBOCHARGER SAFETY VALVE                                                                                      vs. SSE Ground Re        Spectrum 1-Sv-16JIB      0  ESSENTIAL SERVICE WAIAB EMERGENCY DIESEL          AUXILIARY                AB EMER DSL GEN RM, SE      587.00 Yes Boundstg Spectrum JACKET WATER COOLER QT-1 3MB ESSENTIAL                                      PART OF THE RM, AT THE                  vs. SSE Ground SERVICE WATER OUTLET SAFHY VALVE                                            WEST END OF AB EMERG.                  Response Spearum DIESEL JACKET WATER COOLER914T-131~, 10FT ABOVE THE 39      7      1<v-1840          0  ESSENTIAL SERVICE WAI CD EMERGENCY DIESEL          AUXILIARY                CD EMER DSL GEN RM, SE      587.00 Yes Boundstg Spectrum      Yes    Yes            Yes    Yos JACKET WATER COOLER QT 13140 ESSENTIAL                                      PART OF THE RM, 5 FT EAST                vs. SSE Grourxl SERVICE WATER OUTLET SAFETY VALVE                                            OF THE CO EMERG. DIESEL                Response Spectrum GENERATOR RM DOORWAY, 10 FT ABOVE THE FLR 1<v-200AB        0  DIESEL FUEL OIL I AB EMERG DIESEL FUEL OIL        AUXiLIARY                AB EMER DSL GEN RM          587.00 Yes Boundstg Spectrum            Yes MANIFOLD S TO FUEL Oil DAYTANKSAFETY VALVE                                                                            vs. SSE Ground Re        Spectrum 41      7    1<V.20040          0  DIESEL FUEL OIL I CD EMERG DIESEL FUEL OIL        AUXILIARY                CD EMER DSL GEN RM                Yos Boundstg Spectrum            Y8$                  Y85 MANIFOLDSTO FUEL OIL DAY TANKSAFHY VALVE                                                                              vs. SSE Ground Re        Spectrum Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
Print or Type Name                                    Signature ls/~r /85 Date Print or T pe Name CL    Si nature                    Date
 
Walkdown: I/            of 10/04/93 and 10/11/93                                                D.C.. Unit        1                                                                                  Page 4 of 9 SCREENING VERIFIC      I ION  DATA SHEET (SVDS)
Eq.      Equst. to    Rev                                                                  F acr Elev.      Room or Row/column    Base Elev.        Capacity vs. Cap 8  Caveats Anchor    interact Equst CI                      No                                                                                                                            Demaxl Basis    Demand?  OK?    OK?        OK?    OK?
42          1<V.201ABI        0  DiESEL FUEL OIL I AB EMERG DIESEL FRONT BANKFUEL  AUXILIARY      587.00    CD EMER DSL GEN RM                    Yos Boundeg Spectnm        Yos    Yes              Yes    Yes OIL MANIFOLD SAFETY VALVE                                                                                                vs. SSE Ground Response S I <V-201 AB2      0  DIESEl FUEL OIL/ABEMERG DIESEL REAR BANK FUEL      AUXILIARY      58T.OO    AB EMER OSL GEN RM. IN                Yes Boundeg Spectrum              Yes    N/A              Yos OIL MANIFOLDSAFETY VALVE                                                    MIDDLEWEST REGION OF                        vs. SSE Ground THE RM. ON THE TOP SIDE                    Response Spectrum OF AB EDG, 10'BOVE THE FLR 1.SV.201<01      0                  I DIESEL FUEL OIL CD EMERG DIESEI. FRONT BANK        AUXILIARY      587.00    CD EMER OSL GEN RM                        Bounding Spectnm      Y8$
FUEL OIL MANIFOLDSAFElY VALVE                                                                                            vs. SSE Ground Response Spectrum 1<v-201%02        0  DIESEL F UEL OIL I CD EMERG. DIESEL REAR BANKFUEL  AUXILIARY      587.00    CDEMERDSLGENRM,INNE                    Yes Boundeg Spectrum              Yes                      Yes OIL MANIFOLDSAFETY VALVE                                                    CORNER OF CO EDG. lt7                        vs. SSE Ground ABOVE FLR                                  R          Spectnm 1~4It AB        0  DIESEL JACKET WATER/AB EMERGENCY DIESEL            AUXILIARY      587.00    AB EMER OSL GEM RM, IN                    Bounding Specuum      Y8$    Y8$                      Yes AUXILIARYJACKET WATER HEATER QT-134AB SAFHY                                THE NE CORNER OF THE RM.                    vs. SSE Ground VALVE                                                                      1 FT SOUTH OF AB EMERG.                    Response Spectnm DIESEL AUXILIARYJACKET WATER HEATER 47            MV4II<D        0  DIESEL JACKET WATER I CD EMERGENCY DIESEL          AUXILIARY      587.00    CD EMER DSL GEN RM. IN                    Boundeg Spectnm              Yes    N/A                Yes AUXILIARYJACKET WATER HEATER QT-1 34%0 SAFElY                              THE NE PART OF THE RM,                      vs. SSE Ground VALVE                                                                      NEAR THE EAST WALL                        Re        Spectrum l~-78AB1        0  DIESELSTARTINGAIR/ABEMERGDIESEL STARTING          AUXILIARY      587.00    AB EMER DSL GEN RM                        Batedeg Spectnm        Yos    Yes                      Yes AIR RECENER 1 QT-141ABI SAFHY VALVE                                                                                      vs. SSE Ground Response S MV.?8AB2        0  DIESEL STARTING AIR/ABEMERG DIESEL STARTING        AUXILIARY                AB EMERDSLGENRM. INSW                      Botedeg Spectrum      Yos    Yes              Yes    Yos AIR RECEIVER QT-141.AB2 SAFHY VALVE                                        REGION OF RM. ON THE NE                      vs. SSE Ground SIDE OF AB EDG STARTING                    Respanse Spectrum
                                                                                                                              &#xb9;I AIR RECEIVER 43T 141-AB2. S ABOVE THE FLR 1~-78<01          0  DIESEL STARTiNG AIR I CD EMERG DIESEL STARTING    AUXILIARY                CD EMER DSL GEM RM, IN                Yes Boundeg Spectrua              Yes    N/A                Yes AIR RECEIVER QT-141col SAFHY VALVE                                          THE NW PART OF THE RM,                      vs. SSE Ground SW OF CD EMERG. DtESEL                    Response Spectrum STARTING AIR RECEIVER  &#xb9;t.
QT 141@01 51          1-SV-78-C 02      0  DIESEL STARTING AIR/ CO EMERGENCY DIESEl          AUXILIARY                CD EMER OSI. GEN RM, IN                Yes Boundeg Spectrum                    N/A                Yes STARTING AIR RECEIVER(QT-141 4:02) SAF HY VALVE                            THE NW PART OF THE RM,                      vs. SSE Ground SWOF COEMERG.DIESEL                        Response Spectrum STARTING AIR RECEIVER &#xb9;t-QT 1414 D2 1 Sv 79A81        0  DIESEl STARTING AIR I AB EMERG DIESEL CONTROL                    587.00    AB EMER OSL GEN RM                        Boundeg  Spec@urn                              Yes AIR DRYER QT-143AB1 SAFHY VALVE                                                                                          vs. SSE  Ground Response  S 1~-79A82          0  DIESEL STARTING AIR/ABEMERG DIESEl CONTROL                        58T.OO    AB EMER OSL GEN RM                        Boundeg  Spectnm            Y8$    N/A        Yes AIR DRYER QT-143AB2 SAFHY VALVE                                                                                          vs. SSE  Ground Respanse  Spectnm 1~-TSCDt          0  DIESEL STARTING AIR/ CO EMERG DIESEL CONTROL      AUXILIARY      587.00    CD EMER DSL GEN RM, 15 FT                  Baundeg  Spectrum            Yes              Yes    Y8$
AIR DRYER QT-143C01 SAFHY VALVE                                            WEST OF THE CD EMERG.                        vs. SSE  Ground DIESEL GENERATOR RM                        Respcnse  Spectrum DOORWAY, NEARTHE SO.
WALL Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
i2(l 4,/5>
Print or T pe Nalne                                  Signature                    Date                      Printer T pe Name                              Signature                      Date
 
Waikdown: W              of 10/04/93 and 10/11/93                                                  D.C.          Unit 1                                                                        Page 5 of 9 SCREENING VERIFICATION DATA SHEET (SVDS)
Equip, ID    Rev              System/Equpment Descnpoon                            Floor Elev.      Room or RowlCchmn                  Capacsy vs.      Cap>  Caveats                  Equip No                                                                                                                      Demand Basis    Demand?  OK?    OK?              OK'7 I-SV-794:02        0  DIESEL STARTING AIR/CO EMERG DIESEL CONTROL        AUXILIARY      587.00    CD EMER DSL GEN RM                  Boundeg Spectrum      Yes                    Yes A!R DRYER QT-1 4SCD2 SAFETY VALVE                                                                                    vs. SSE Ground Response S psctrum 1-WRV.?21        0  ESW/AB EMERG DIESEL SOUTH COMBUSTIONAIR            AUXILIARY        587.00    AB EDG RM,                          Boundeg Speclnsn            Yes    N/A              Yes AFTER COOLER  HE< 7ABS ESW INLET/BYPASS VALVE                                                                      vs. SSE Ground Re        Spectrum 57            1.VVRV-?23        0  ESW/AB EMERG DIESEL GENERATOR NORTH                AUXILIARY        587 00    AB EDG RM.                          Boundeg Speceum              Yes                    Yes COMBUSTIOM AIR AFTERCOOLER HE<?ASM ESW                                                                              vs. SSE Ground INLET/BYPASS VALVE                                                                                                Response S 1.WRV-725        0  ESWI CD EMERG DIESEL SOUTH COMBUSTION AIR          AUXILIARY        587.00    CD EDG RM.                          Boundeg Speceum      Yes    Yes    NIA              Yes AFTERCOOLER HER?CDS ESW INLET/BYPASS VALVE                                                                          vs. SSE Ground Response S 59            1.WRV.727        0  ESWI CO EMERGENCY DIESEL NORTH COMBUSTION          AUXILIARY                  CD EDG RM. IN MIDDLE OF N.          Boundeg Spectnsn      Yes    Yes                    Yes AIR AFTERCOOLER HE<?CON ESW tNLET/BYPASS                                      REGM OF RM. 4'N. OF E. END            vs. SSE Ground VALVE                                                                        OF CD EMERGENCY DIES EI            Response Spect/um 4'BOVE FLR 1-XRV-220        0  DIESEL STARTING AIR I AB EMERG DIESEL STARTING    AUXILIARY        587.00    AB EDG RM.                          Boundeg Spectrum            Yes                    Yes AIR JET ASSIST CONTROL VALVE                                                                                        vs. SSE Grourd R          S 61            1  XRV-221        0  DIESEL STARTING AIR I AB EMERG DIESEL FRONT BANK  AUXILIARY        587.00    AS EDG RM.                          Boundeg Spectrum            Yes                    Yes STARTING AIR SHUTOFF VALVE                                                                                          vs. SSE Ground Response S 62            1.XRV-222        0  DIESEL STARTING AIR I AB EMERG DIESEL REAR BANK    AUXILIARY        587 00    AB EDG RM.                          Boundeg Spectrum                                    Yes STARTING AIR SHUTOFF VALVE                                                                                          vs. SSE Ground Response S 1.XRV-225        0  DIESEL STARTING AIR/CD EMERG DIESEL STARTING      AUXILIARY        587.00    CD EOG RM,                          Boundeg Spectrum      Yes                            Yes AIR JET ASSIST CONTROL VALVE                                                                                        vs. SSE Ground Response S 1.XRV-226        0  DIESEL STARTING AIR/CD EMERG DIESEL FRONT BANK    AUXILIARY        587.00    CD EDG RM.                    Yes    Boundeg Spectrum      Yes    Yes    WA              Yes STARTING AIR SHUTOFF VALVE                                                                                          vs. SSE Ground Response S 1.XRV-227            DIESEL STARTING AIR I CO EMERG DIESEL REAR BANK    AUXILIARY        587.00    CD EDG RM,                    Yes    Boundeg Spectrum      Yes          WA STARTING AIR SHUTOFF VALVE                                                                                          vs. SSE Ground Response S 1-HV4? DP-AB 1      0  DIESEL ROOM VENTILATI AB EMERGENCY DIESEL          AUXILIARY                  AB EOG RM, 1Z W OF THE        Yes    Botndeg Spacoum      Yes          WA      Yss    Yes GENERATOR ROOM VENTILATIONEXHAUSTFAN HV-                                      RNrs ENTRANCE. 9'W  OF              vs. SSE Ground DGX-1 TEMPERING AIR DAMPER                                                    AB EMERGENCY DIESEL                Response Spectrum FUEL OIL DAY TANKS 14lT-107AB 67          141'?OP~2            0  DIESEL ROOM VENTILATI DIESEL GENERATOR ROOM        AUXILIARY                  AB EDG RM. 22 FEET E OF AB          Boundeg Spectnsn      Yss          NIA 1AB VENTILATIONSUPPLY FAN HV4IGS-1 TEMPERING                                  EMERGENCY DIESEL FUEL                  vs. SSE Ground AIR DAMPER 141V47DP~Z                                                        OIL DAYTANK9 1427-1 07~,            Response Spectrum 12 FEET FROM THE N WALL 141V4?DPot          0  DIESEL ROOM VEMriLATI CD EMERGENCY DIESEL          AUXILIARY                  CO EDG RM, IN MIDDLE SW              Bound eg S pact/um    Yes          N/A              Yes GENERATOR ROOM VENTILATIONEXHAUST FAN HV-                                    REGN OF RM, NEAR THE S                vs. SSE Ground DGX-2 TEMPERING AIR DAMPER                                                    WALL, 10'BOVE FLR                  Response S 69          141V<DP<02          0  DIESEL ROOM VENTILATIDIESEL GEN ROOM 1 CD          AUXILIARY                  CO EDG RM. IN SE REGN OF            Boundeg Spectrum      Yes    Yes    WA              Yes VENTILATIONSUPPLY FAN 14IV4?GS-2 TEMPERING AIR                                RM.NEAREWALI 1lyABOVE                  vs. SSE Ground DAMPER 14IV4?DPCD2                                                            FLR                                Response 70            1+80-240          0  DIESEL LUBE OIL/AB EMERG DIESEL UPPERVALVE        AUXILIARY        587.00    AB EMER OSL GEN RM            Yes    Boundeg Speci/um      Yes                            Yas GEAR LUBRICATIONCONTROL SOLENOID 1                                                                                  vs. SSE Ground Response Spectnsn Certification:
AII the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" indudes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
IE/ t t /g~
Print or T pe Name                                  Signature                      Date                      Print or T pe Name                      Si nature                    Date
 
Walkdown:    I/          of 10/04/93 and 10/11/93                                                D.C.. Unit      1                                                                                                Page6of9 SCREENING VERIFIC    I ION  DATA SHEET (SVDS) lt<<n  Eq.        Eqrsp. ID    Rev                                                                  Fkor Elev.      Room N RorrCoturnn                  ease Ekn/.        Capacity vL      C8p >  Ca vesta Anchor          Equip CI                        No                                                                                                                                      Demand Basis      Demand?  OK?      OK'7          OK?
71    8        14.60-241        0  DIESEL LVSE OIL I AB EMERG DIESEL UPPER VALVE      AUXILIARY              AB EMER DSL GEN RM                        5S7.00  Yes Boundeg Spectrum        Yes    Y8$    N/A            YOS GEAR LUBRICATIONCONTROL SOLENOID 2                                                                                                  vs. SSE Ground Response Spectnsn 72    8        14.60-245        0  DIESEL LUBE OIL/CD EMERG DIESEL GENERATOR          AUXILIARY              CD EMER DSL GEN RM                                  Yes Boundeg Spectrum        Yes    Y8$            Yes    Yes UPPER VALVEGEAR LUBRICATIONCONTROL SOLENOID                                                                                          vs. SSE Ground 1                                                                                                                                  Response Spectrum 73    8        1460.246        0  DIESEL LUBE OIL/ CD EMERG DIESEL GENERATOR        AUXILIARY              CD EMER OSL GEM RM                        587.00  Yes Boundeg Spectnsn        Yes    Yes    N/A UPPER VALVEGEAR LUBRICATIONCONTROL SOLENOID                                                                                          vs. SSE Ground 2                                                                                                                                  Response S pectnsn 74    9        1 4tv47GS-1      0  DIESEL ROOM VENTILATI AB EMERG DIESEL              AUXILIARY              AB EOG RM, IN THE SE REGN                  587.00  N/A    1.5 x Boundeg        YOS    Yes                    Yes GENERATOR VEMTllATIONSUPPLY FAN                                            OF THE RM, 36'E OF THE                                      Spectnsn vs.
Rhrs ENTRANCE. 13'BOVE                                    ROOTSSc Median THE FLR                                                    Cont<<ed Fkor Re        Spectra 75    9        14IV47GS-2      0  DIESEL ROOM GENERATO I CO EMERG DIESEL            AUXILIARY              CD EDG RM, IN SE REGN OF                  587.00  N/A    1.5 x Boundeg        Y8$    Yes            Y8$    YOS GENERATOR ROOM VENTILATIONSUPPLY FAN                                      THE RNL 20' OF CO EDG,                                      Spectrum vs.
THE FLR                                                    M<<fian 10'BOVE ROSTsdc Centered Floor Re 76    9        14IV4>G&3        0  DIESEL ROOM VENTILATI AB EMERG DIESEL              AUXILIARY              AB EDG RM,                                          N/A    1.5 x Boundeg        Yes    Yes    Yes      Yes    Yes GENERATOR ROOM CONTROL PANEL VENTILATION                                                                                              Spectrum vs.
SVPPLYFAN                                                                                                                            Reaasdc Median Centered Fker Re        S 77    9        14IV47GSA        0  DIESEL ROOM VENTllATI CD EMERG DIESEL              AUXILIARY              CD EDG RM,                                587.00  N/A    1.5 x Bourxleg      Yas. Yes    Yes      Yes    YOS GENERATOR ROOM CONTROL PANEL VEMTllATION                                                                                              Spectrum vs.
SUPPLY FAN                                                                                                                          R881$ 5c Meden Centered Fkxx Re        S 78    9        14IV47GX-1      0  DIESEL ROOM VENTILATI AB EMERG DIESEL              AUXILIARY              AB EDG RM, IN THE NW REGN                  587.00  N/A    1.5 x Boundeg        Y8$    Yes    Yes      Yes    YOS GENERATOR ROOM VENTILATIONEXHAUST FAN                                      OF THE RM. ABOVE AB EDG                                    Spectrum vs.
STARTING AIR COMPRESSOR                                  ROSSstic Median
                                                                                                                <<1<T-142~, 13'BOVE                                        Centered Boor THE FLR                                                  Re        Spectra 79    9        1 4IV47GX-2      0  DIESEL ROOM VENTILATICO EMERG DIESEL              AUXILIARY              CO EDG RM, IN THE MIDDLE                  587,00  N/A    1.5 x Boundeg        YOS    Yes            Y8$
GENERATOR VENTILATIONEXHAUST FAN                                          SW REGM OF THE RM. 10'W                                    Spectrum vs.
OF CO EDG, 1I7 ABOVE THE                                  Rearrsdc Median FlR                                                        Centered Fker Res    SOS      a 80    12      147T402.AS        0  DIESEL COMBUSTION Al I AB EMERG DIESEL            AUXILIARY              AS EDG RM, IN THE NW REGN                  587.0O  Yes Boundeg Specuum        Yes    Yes TURBOCHARGER                                                              OF THE RM,5 NE OF THE                                    vs. SSE Ground ENGINE ENO OF AB-EDG,                                  Response Spectrum THE FLR 10'BOVE 81    12      143T-502ND        0  DIESEL COMBUSTION Al/CO EMERG DIESEL              AUXILIARY              CD EDG RM, IN THE MIDDLEE                  587.00  Yes Boundeg Spectnm        YOS    YOS            Yes    Yes TURBOCHARGER                                                              PART OF THE IU/L ON THE                                  vs. SSE Ground DIESEL END OF CD EDG,                                  Respcese Spectrum THE FLR 10'BOVE 82    14                        0  120208V MISC. SAFTE I POWER PANEL                  AUXILIARY              CO EOG RM, 10 FEET NWOF                    587.00  Yes Boundeg Spectrum        Yes    Yes    Yes      Yes    Yes CD EMERGENCY DIESEL                                      vs. SSE Ground GENERATOR <<143ME-1 50CD,                                Response Spect/um ONTHENWALL Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
Print or Type Name                                  Si nature                      Date                    Print or T pe Name                                          Si nature                        Date
 
Walkdown:    V          of 10/04/93 and 10/11/93                                                  D.C.. Unit        1                                                                        Page 7 of 9 SCREENING VFRIFICA ON DATA SHEET (SVDS) aom    Eq                      Rev                                                        8usdng      Fker Elev.        Room or Row/Column              Capac(ty vs.      Cape        Ancncr    Inteact  E(FNI Cl                      No                                                                                                                      Oenand Basis      Demand?        OK?      OK?    OK?
83    14                        0  120/208V MISC SAFETY I 120/208 VAC AUXILIARY        AUXILIARY                CD EDG RM, IN NW REGN OF    Yes  B(xndng S pact/um      Yos                            Yes FEEDWATER DISTR PNL                                                            RM, 5 FT. N OF NE END OF            vs. SSE G/ound EMERG DIESEL GEN CD, ON          Response Spectrum THE N WALISFT. ABOVE FLR 84    14          1<LSC        0  120/208V MISC SAFTEY  / POWER PANEL                  AUXILIARY    587.00      AB EOG RM, IN THE NE REGM    Yos  Boundng Speci(um        Yes          Yes      Yes    Yes OF THE RM, ON THE N WAU              vs. SSE Ground
                                                                                                                  '0FEETEOFlHERM'S                    Response Spectrum ENTRANCE DOOR 85    14        1<LSCX        0  120(208V MISC SAFETY I 120/208VAC EMERG LOCAL        AUXILNRY                  AB EDG RM, IN SE REGN OF    Yes  Boundng Spect/um                                      Yes SHUTDOWN AUXILIARYD ISTRIBVlloMPANEL                                          RM, ON S WALI10FT. S OF            vs. SSE Ground AB EMERG DIESEL GEN                Re          S 86    17    14?ME-1 50AB        0  DIESEL GENERATOR CON I AB EMERG DIESEL              AUXILIARY                AB EOG RM, N THE CENTER      Yos  Boundng Spectrum                    Yes      Yes    Yos GENERATOR                                                                      OF THE RM                            vs. SSE Ground R          6 87    17    14?ME-1 50CD        0  DIESEL GENERATION CO I CD EMERG DIESEL              AUXILIARY                CO EOG RM, IM THE COMER      Yos  B(xndng Spectrum            Yes              Yes    Yes GENERATOR                                                                      OF THE RM                            vs. SSE Grourxl Re          Spectrum 88    18      1 CPS412        0  DIESEL JACKET WATER I AS EMERG DIESEL JACKET        AUXILIARY    587.00      AB EMER OSL GEN RM, 5 FT    Yos  Boundng Specuum WATER PUMP QT-13OAB1 DISCHARGE PRESSURE                                        SE OF DGAB RM DOORWAY,              vs. SSE Ground SWITCH                                                                        IN THE WEST DOOR OF                Response Spectrum PANEL DGAB. 6 FT ABOVE THE FLR 89    18      t<P&314          0  DIESEL JACKET WATER I AB EMERG DIESEL JACKET        AUXILIARY                AB EMER DSL GEN RM, 5 FT    Yes  Boundng Spactnm                      Yes WATER PUMP QT-I 3OAB2 DISCHARGE PRESSURE                                      SE OF DGAB RM DOORWAY.              vs. SSE Ground SWITCH                                                                        N THE WEST DOOR OF                Response Speci/um PANEL DGAB. 7 FT ABOVE THE FLR 90    18      1CP&317          0  DIESEL JACKET WATER I CO EMERG DIESEL JACKET                                  CO EMEROSLGENRM,SFT          Yos  Boundng Spectrum                    Yos              Yes WATER PUMP QT-130COI DISCHAREG PRESSURE                                        WEST OF THE DGCD                    vs. SSE Gr(xnd SWITCH                                                                        DOORWAY,IN THE DGCO                Response Spectrum PANEL 91    18      1&P&319          0  DIESEL JACKET WATER I CD EMERG DIESEL JACKET        AUXILIARY                CO EMER OSL GEM RM. 5 FT    Yos  Boundng Spacuurn        Yes WATER PUMP QT 130CO2 DISCHARGE PRESSURE                                        WEST OF DGCD DOORWAY.                vs. SSE Grourd SWITCH                                                                        IM THE DGCD PANEL                  Response S 92    18      1 4.Ls-1 20      0  D(ESEl FUEl OIL I AB EMERG DIESEL FUEL OIL DAY      AUXILIARY    587.00      AB EDG RM, 'RELAY                    1.5 x Boundng        Yos          No TANKQT-107~ HIGH LEVEL SWITCH 1                                                CHATTER ANALYSISIS DONE                Spectrum vs.
UNDER FUEL TRANSFER                  Reatndc Median PUMP                                  Centered Fkxfr Re          S    a 93    18                        0  DIESEL FUEL OIL/ABEMERG DIESEL FUEL OIL DAY                        587.00      AB EOG RM, 'RELAY                    1.5 x Boundng        Yos TANKQT-107~ LOW LEVEL SWITCH 1                                                CHATTER ANALYSIS IS DONE              Spectnm vs.
UNDER FUEL TRANSFER                  Rear(stfc Median PUMP                                  Centered Fker Response Spectra 94    18        1  LLS-122      0  DIESEL FUEL OIL/AB EMERG DIESEL FUEl oil DAY        AUXILIARY                ABEDGRM, RELAY                        1.5 x Boundng        Yes          No        Yos      No TANKQT 107-AB HIGH LEVEl SWITCH 2                                              CHATI'ER ANALYSISIS DONE              Speci(um vs.
UNDER FUEL TRANSFER                  Reassdc Median PUMP                                  Centered Fkxx Response Spectra Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or Type Name                                  Signature
                                                                                *~ ?        f >IIO /9.r Date                        Print or Type Name C    (~
S'ature c
Date
 
Walkdown; W,          of 10/04/93 and 10/11/93                                                    D.C.. Unit  1                                                                                  Page 8 of 9 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq      Equip. ID    Rev              System/Eqtspment Descripten                                                            Base Elev.          Ca pacer vs.      Cap >  Caveats        attaract Eqrsp CI                    No                                                                                                                        Demand Bash        Demand?  OK?    OK?      OK?    OK?
95    18      14.LS-I23      0  DIESEL FUEL OIL I AB EMERG DIESEL FUEL OIL DAY      AUXILIARY    587.00 AB EOG RM, 'RELAY                    N/A      'I.S x Boundng              Yes    No        Yos    No TANKQT-1 07~ LOW LEVEL SWITCH 2                                          CHATTER ANALYSISIS DONE                          Spectrum vs.
UNDER FUEL TRANSFER                          Realhdc Morrran PUMP                                          Centered Fker Re          S 18      14LS-125      0  DIESEL FUEL OIL I CD EMERG DIESEL FUEL OIL OAY      AUXILIARY            COEDGRM. RELAY                        Yes  Boundng Spectrum        Yes  Yos  Yes        Yes    Yos TANKQT-10?NO HIGH LEVEL SWITCH 1                                        CHATTER ANALYSIS IS DONE                      vs. SSE Ground UNDER FUEL TRANSFER                        Response Spectrum PUMP 97    18      1+Ls 126      0  DIESEL FUEL OIL I CO EMERG DIESEL FUEL OIL DAY      AUXILIARY    587,00 CO EDG RM, 'RELAY                    Yos  Borndng Spect/um        Yes        Yos        Yes    Yes TANKQT-1 07<0 LOW LEVEL SWITCH 1                                        CHATTER ANALYSIS IS DONE                      vs. SSE Ground UNDER FUEL TRANSFER                        Response Specbum PUMP 18      1<LB-1 27      0  DIESEL FUEL OIL I CO EMERG DIESEL FUEL OIL OAY      AUXILIARY          COEDGRM, RELAY                        Yes  Boundng Spectrum              Yes                    Yes TANKQT-1 07D HIGH LEVEL SWITCH 2                                        CHATTER ANALYSIS IS DONE                      vs. SSE Ground UNDERFUELTRANSFER                          Response Spectnsn PUMP 18      1+is-I 28      0  DIESEL FUEL OIL I CD EMERG DIESEL FUEL OIL DAY      AVXII.IARY          CD EOG RM. 'RELAY                    Yes  Boundng Spectrum        Yes  Yos    Yes      Yos TANKQT-I 0?CD LOW LEVEL SWITCH 2                                        CHATTER ANALYSIS IS DONE                      vs. SSE Ground UNDER FUEL TRANSFER                        Response Specuum PUMP 18                      0  DIESEL COMBUSTIONAI/ABEMERGENCY DIESEL              AUXILIARY          AB EMER OSLGENRM,SFT                  Yes  Boundng Spect/um                                Yes    Yes FRONT BANKA!R CHEST EXTREME HIGH PRESSURE                                SE OF AB EMERG. DIESEL                        vs. SSE Ground SWITCH                                                                  GEN. RM DOORWAY, ON THE                    Response Spectrum NORTH WAU INSIDE AB EMERG. DIESEL GENERATOR CONTROL SUB PANEL &#xb9;1-DGAB 101    18                      0  OIESEI. COMBUSTION Al/  CD EMERGENCY DIESEL        AUXILIARY          CO EMER DSL GEN RM, 5 FT              Yes  Boundng Spectrum        Yos  Yes              Yos    Yes FRONT BANKAIR CHEST EXTREME HIGH PRESSURE                                WEST OF CO EDG RM                            vs. SSE Ground SWITCH                                                                  DOORWAY. INSIDE CD                        Response Spectnm EMERG. DIESEL GENERATOR SUBPANEL &#xb9;W)GCD 19      1-vrsdat        0  DIFSEL ROOM VENTIIAT/ABEMERGENCY DIESEL              AUXILIARY          AB EDG RM,24'WOF RM                  N/A      1.5 x Boundng        Yos  Yos              Yos    Yos GENERATOR ROOM VENTILATIONFANS HVAR-1 AND                                ENTRANCE. 15'BOVE FLIL                          Spect/um vs.
HOGS-1 THERMOSTAT                                                        ON AB EMERGENCY DSL                          Reathdc Morfian GENERATOR RM                                  Centered Fker VENTILATIONEXHAUST FIRE                      Response Spectra DAMPER 1-HV4?GXWD-1 19      1.vrs445        0  DIESEL ROOM VENTILATI AB EMERGENCY DIESEL            AVXtLIARY    596.00 AB EDG RM,                            Yos  Boundng Spscuum          Yes  Yes    N/A      Yes    Yes GENERATOR ROOM VENTILATIONFANS OUTSIDE AIR                                                                            vs. SSE Ground THERMOSTAT                                                                                                          Respcnse snoot/um 19                      0  DIESEL ROOM VENTIIATI CD EMERGENCY DIESEL            AUXILIARY          CD EDG RM. IN SW REGN OF                      1.5 x Boundng              Yes    NIA              Yes GENERATOR ROOM VENTILATIONFANS HVAR.2 AND                                RM. 1P S. OF THE                                Spectrum vs.
HV-DGS-2 THERMOSTAT                                                      GENERATOR END OF CD                          Rearrsdc Median GENERATOR 1%ME-1 SOCD.                        Centered Boor ON THE W. SIDE OF EXHAUST                    Response Spectra FAN 146f4%X-2. 1Z ABOVE FUL Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "AII information" Includes each entry and conclusion (whether veNied to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or T pe Name eL  Signature t- s-g Date
 
Walkdown: Weeks of 10/04/93 and 10/11/93                                                      D.C. Cook Unit 1                                                                                      Page 9 of 9 SCREENING VERIFICATION DATA SHEET (SVDS)
Item    Eq.        Equp. ID  Rev            system/Equ'pmont Descnpcon                          Floor Elev                            Base Elev.        capacity vs.      Cap >  Caveats Anchor            Equip CI                    No                                                                                                                          Demand Basis      Demand?  OK?    OK'7              OK?
14IGAB-X    0  EQUIP CTRL AND INDIC IAB EMERGENCY DIESEL                                  AB EMER DSL GEN RM, IN                Yes Bwstdeg Spoctnsn        Yos    Yes              Yos      Yos GENERATOR OME-1 SOAB AUXILIARYPANEL                                        THE MIDDLEWEST REGION                        vL SSE Ground OF THE RM, NEAR THE                        Response Spectrufi CENTER OF THE WEST WAU 5FTNORTHOFAB EDG STARTING AIR RECEIVER 814?T-1 4 &181 14IGCD-X    0  EQUIP CTRLAND INDICICD EMERGENCY DIESEL          AUXIUARY                  CD EMER DSLGENRM, IN                      Bourxang Spectnsn      Yes    Yos    Yos      Yes      Yos GENERATOR OME-1 50CD AUXtLIARYSUBPANEL                                      THE WEST REGION OF THE                      vs. SSE Ground RM,4FTSOUTHOF CD                          Response Spectnmt EMERG. DIESEL STARTNG AIR RECEIVER $ 14?T 1414'Dt 107    0                        STARTING AIR SYST I PILOT OPE RATED 4 WAYVALVE    AUXIUARY                AB EDG RM, IN THE SE REGN                      Judgment vL        Yes                    Yes      Yos FOR AIR START XRVS FOR DIESEL ENGINE                                        OF THE RM, ON THE SE END                    Realistic Merfm OF THE DIESEL END OF AB                      Centered Floor EDG                                        Re          S 10$      0      1+OV-2ND      0  STARTING AIR SYSTI PILOT OPERATED 4 WAYVALVE      AUXILIARY                CD EDG RM,                                    Judgment vs.        Yes            Yes      Yes      Yos FOR AIR START XRVS FOR DIESEL ENGINE                                                                                    Reafrsdc Median Centered Floor Response S 109      5                    0  AB EMERG DIESEL LUBE OIL BEFORE AND AFTER PUMP    AUXILIARY      579.00  AB EDG LUBE OIL PIT, IN THE            Yes Bounc4ng Spectnsn        Yos  Yos    Yos      Yos      Yos MIDDLEREGN OF THE PIT,                      vs. SSE Ground NEAR THE FUL                              Re          S CBftiflee'lion:
All the Information contained on this Screening Verification Data Sheet (SVDS) Is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
rli~      c Print or T pe Name                              Signature                      Date                      Print or T pe Name                              Signature                      Date
 
Walkdown: Ween            0/18/93                                                              DC COO          .<IT 1                                                                              Page  1 of 2 SCREENING VERIFICATION DATA SHEET (SVDS)
Item  Eq Cl    Equp ID  Rev      srstem/EquPmsnt DesofptCn              Fkwr              Room or Row/Column              Base                  Capaaty vs              Cap >  Caveats Ancter            Equip No. No                                              Elev.                                              Elev.                Demand Basis          Demand?  OK?    OK?              OK'/
14      1-BATT-  0  250V Dc DISTRIBUTIONI PtAMT  AUXfL!ARY    613,00 4KV RM. Mezzanee Area. IN CENTER OF THE              YBS Boundeg Spectnsn vs SSE Grourxl            Yes    YBs              Yes AB-SH        BATTERY BATTYAMMETER                              RM. OM PLANT BATTERYAB CONTROL PANEL                            Response Spect/um SHUNT                                            &#xb9;14IC-AB 2    14      1-BATT. 0  250V DC DISTRIBUTION/ PLANT  AUXILIARY    626.00 CO BATT EQUIP AREA, N N END OF THE RM.              YBS Boundeg Spectnm vs SSE Ground                      Yes CO-SH        BATTERY BATTED AMMETER                            ON PLANT BATTERY CD CONTROL PANEL &#xb9;1-                          Response Spectnm SHUNT                                            BC4:D 3    14    1-BATTY/-  0  250VDC CONTROL AND I I        AUXILIARY    633.00 HALLWAY,                                                    1.5 x Baedeg Spectrum vs SH        METERING SHUNT                                                                                              Rearndc Mec5an Centered F/oor Response Spectra 14      1.8C-AB-  0  250 VDC DISTRIBUTIONI PLANT  AUXILIARY    613.00 4KV RM. Mezzanee Area. IN CENTER OF RM,              Yes Boundeg Spectrum vs SSE Ground SH        BATfERY CHARGER AMMETER Bc                        ON PIAMT BATTERYAB CONTROL PANEL 1-                            Response Spectnm AB SHUNT CABINET                                  Bc-AB 5    14      I.BCCD-    0  250V DC DISTR/BUT/ON I PLANT  AUXlt.iARY  626.00 CD BATT EQUIP AREA, IN N END OF THE RM,    633.00      Boundeg S pectnm vs SSE Ground SH        BATTERY CHARGER BCCD SHUNT                        ON THE PLANT BATTERY CD CONTROL PANEL                          Response Spectnm CABINET                                          &#xb9;14ICCD 6    14    I.BCTCWB    0  250V Dc DISTRIBUTION/PLANT    AUXILIARY    613.00 4KV RM. Mezzanine Area, IN SW REGN OF THE                Boundeg Spectrum vs SSE Ground      Yes BATTERYCHARGERS Bc-AB1 AND                        RLL 2 FT E OF PLANT BATTERY CHARGER &#xb9;1-                        Response Spectrum BC482 TRANSFER PANEL                              BC-AB2. 4 FT W OF THE E WALL 14    1  BCTC<D    0  250V DC DISTR/BUT/ON I PLANT  AUXILIARY  626.00  CD BATT EQUIP AREA, IN N END OF THE RM, 4  633.00      Baedeg Spectrum vs SSE Ground      Yes BATTERYCHARGERS BC4:01 AND                        FT NE OF PLANT BATTERYCHARGER &#xb9;14I C-                          Response Spectnm BCCD2 TRANSFER PANEL                              CD1 6    14    1<CV-AB        250VDC DISTRIBUTIONI POWER    AUXILIARY  633.00  CONTROL RM, IN THE NE CORNER OF THE RM. 633.00      Boundeg Spectrum vs SSE Graed      YBS PANEL                                            ON THE E WALL 15 FEET S OF THE N WALL                          Response Spectnm 14    1 <CV<O    0  250VDC DISTRIBUTIONI250VDC    AUX!LUCY    633.00  CONTROL RM, IN THE N E CORNER OF THE                    Baedeg Spectnm vs SSE Ground        YBS            Yes TRAIN 'A'RITICALSOLENOID                          RM. ON THE E WALIONCONTROL RM E                                Response Spectnsn VALVES DISTRIBUTION PANEL                        REAR INSTRUMENT RELAY RACK &#xb9;1<RR 10    14                0  250VDC DISTRIBUTIONI POWER    AUXILIARY  633.00  CONTROL RM, ON THE REAR SIDE OF NON-        633.00      Boundeg Spectnm vs SSE G/Bund      Yes            Yes PANEL                                            ESSENTIAL SERVICE WATER CONTROL PANEL                          Response Spectrum
                                                                                &#xb9;14/SW 11    14      1CRCD        250VDC DISTR/BUTION I POWER  AUXILIARY  633.00  CONTROL RM. IN THE SW PART OF THE RM. 2                  Boundeg Spectnm vs SSE Ground      Yes            YBS PANEL                                            FEET NE OF UNIT 2 HOT SHUTDOWN PANEL                            Response Spectnsn
                                                                                &#xb9;24ISD2 12    14      1<RID-I  0  120VAC CONTROL ROOM I 120VAC  AUXILIARY  633.00  CONTROL RM. I/O THE NE CORNER OF THE RM    633.00  Yes Boundeg Spectrum vs SSE Ground      Yes    YBS    YBS      Yes      Yes CONTROL ROOM INSTRUMENT                                                                                          Response Spectrum DISTRIBUTION CH-1 13    14      1<RID-II  0  120V AC DISTR/BVTIONI 120VAC  AUXILIARY  633.00  CONTROL RM. IN NE CORNER OF THE RM, ON      633.00      Boundeg spectrum vs SSE Ground            YBS    Yes      YBs    YBS CONTROL ROOM INSTRUMENT                          EWALIBFTSOF NWALL                                              Response Spectnm DISTRIBUTION CH-II 14    14      1&RID-III  0  120VAC CONTROL ROOM/120VAC    AUXILIARY  633.00  CONTROL RM. IN THE NE CORNER OF THE RM,    633.00      Boundeg Spectrum vs SSE Ground            YBs    YBS      YBS    YBS CONTROL ROOM INSTRUMENT                          ON THE E WALLON CONTROL RM E REAR                              Response Spectrum DISTRIBUTIONCH-III                                INSTRUMENT RELAY RACK ERR &#xb9;t 15    14    1<RID-IV    0  120VAC CONTROL ROOM/120VAC    AUXILIARY  633.00  CONTROL RM. IN THE NE CORNER OF THE RM,    633.00      Baedeg specuum vs ssE Ground              Yes    YBs      YBS    YBS COMTROL ROOM INSTRUMENT                          ON THE E WALLON CONTROL RM E REAR                              Response Spectrum DISTRIBUTION CH4V                                INSTRUMENT/REtAYRACK I ERR&#xb9; 16    14        1-DCN        250VDC CONTROL AND I /250VDC  AVX/LIARY  633.00  HALLWAY,15 F EET SE OF THE UNIT 1                        Baedeg Spec/nsn vs SSE Grourd                              YBS POWER PANEL                                      CONTROLRMEMERGENCYEXITDOOR,ON                                  Response Spectnm THE E WALIIN THE MIDDLE E PART OF THE HALLWAY t?    14                0  250V DC DISTRIBUTION/250V DC  AUXILIARY  60900  AB BATT EQUIP AREA, INMIDDLENREGN OF                    Boundeg Spectrum vs SSE Ground                    Yes DISTRI8 DION PANEL MCAB                          THE RM, 6 FT N OF AB BATTERY FIRE DOOR.                        Response Spectnm ON THE N WALL Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed rofessional engineer.)
Print or Type Name                              ignature                          Date                      Print or Type Name                              Signature                  Date
 
Walkdown. Wee            0/18/93                                                                DC CO          IIT1                                                                              Page 2 of 2 SCREENING VERIFICATION DATA SHEET (SVDS)
Item  Eq Cl    EquS/ ID Rev      System/Eqrspment Descrsxee    8urtdeg. Fker              Room or Row/Cr&#xb9;umn                                    Capacrty vs            Cap >  Caveats        Interact Equp No      No                                              Elev.                                                                  Demand Basis          Demand?  OK?              OK?    OK?
18      14      1.MCCD    0  250V DG DISTR/250V DC            AUXILIARY        CD BATT EQUIP AREA, IN S END OF THE                    Boundeg Spect/um vs SSE Ground            Yes              Yes    Yes DISTRIBUTION POWER PANEL                          HALI.WAY,ON THE WESST WALL. 2 FT N OF                          Response Spectrum THE RMS ENTRANCE DOOR 19      14      14VIDAB  0  250VDC DISTRIBUTIONI250 VDC      AUXILIARY        AB BATT EQUIP AREA, IN THE MIDDLEN REGN    609.00  Yes Bourxleg Spectrum vs SSE Ground            YBS              Yes POWER PANEL                                        OF THE RM, 6 FEET N OF AB BATTERY                              Response Spectrum EQUIPMENT AREA FIRE DOOR, ON THE N WALL 20      'l4    14/IOCD  0  250VDG DISTRIBUTIONI POWER      AUXILIARY        CD BATT EQUIP AREA, IN THE S END OF THE    633.00  Yes Brxedeg Spectrum vs SSE Ground    Y8$    YBs              YBS    Yes PANEL                                              HALLWAY,ONTHEWWALIBFEETNWOF                                    Response Spectrum THE RMS ENTRANCE DOOR 21      14    14SV.A1    0  250VAC DISTRIBUTION I 250VDC    AUXILIARY        NUCLEAR SAMPLING RM, IN THE MIDDLE S      587.00  Yes Boundeg Spectrum vs SSE Groted    Yes    Yes    Yes      Yes    Yes TRAIN'A'UCLEARSAMPLING                            REGN OF THE RM. ON THE S END OF THE                            Response Spectrum FEEDER PANEL &#xb9;1                                    NUCLEAR SAMPLING SYSTEM SMAPLING CONTROL PANEL &#xb9;1-SCP. 5FT ABOVE THE FLR 22      14    1-SSV-A2    0  250VDC I 250VDC NUCLEAR          AUXILIARY        NUCLEAR SAMPLING RM, IN THE MIDDLEOF      587.00  Yes Boundeg Specuum vs SSE Groted                                      YBS SAMPLING FEEDER PANEL &#xb9;2                          THE RM, ON THE S END OF THE NUCLEAR                            Response Spectrum SAMPLING CONTROL PANEL &#xb9;14CP, 3 FEET ABOVE THE FLR 23    14      1-SSV.B    0  250VDG DISTRIBUTIONI POWER      AUXiLIARY        NUCLEAR SAMPLING RM. IN THE MIDDLE N      587.00  Yes Bourxieg Spectrum vs SSE Ground PANEL                                              REGN OF THE RLL ON THE N END OF THE RM                        Respcese Specuum PANEL &#xb9;1-SCP. 4 FEET ABOVE THE FLR 24    14      1-T DAB  0  250VDC DISTRIBUTION/250 VDG      AUXILIARY        AB BATT EQUIP AREA, IN THE NEASST REGN                  Boundeg Spectrum vs SSE Ground            Yes POWER PANEL                                        OF THE RM. 2 FEET N OF THE ENTRANCE                            Response Spectrum DOOR, ON THE N WALL 25    14      1-TOGO    0  250VDG DISTRIBUTIONI POWER      AUXILIARY  626 00 CD BATT EQUIP AREA, AT THE SOTH ENO OF                  Boundeg Specuum vs SSE Ground                                      Yes PANE ITRAINA TRANSFER                            THE HALLWAY,ON THE W WALI10FEET NW                            Response Spectrum CABINET                                            oF THE IU/rs ENTRANGE DQQR 26    14    1.VDAB-1    0  250V DC DISTR I 250V DC VALVE    AUXILIARY        CONTROL RM, BEHIND CONDENSATE              633.00  Yes Boundeg Spectrum vs SSE Ground    Y8$    YBS DISTRIBUTION PANEL VDAB-1                          CONTROL PUMP PANEL &#xb9;14P                                        Response Spectrum 27    14    1-VDAB-2    0  250VDC DISTR I 250V Oc VALVE    AUXILIARY        CONTROL RM, ON THE REAR SIDE OF            633.00  Yes Bourxieg Spectrum vs SSE Ground    YBS    YBS    Yes      No DISTRIBUTION PANEL VDA8.2                          CONDENSATE PUMP CONTROL PANEL &#xb9;tP                              Response Spectrum 28      14    1-VDCD-1    0  250VDC DISTR I 250V DG VALVE    AVXII.IARY        CONTROL RM, ON REAR SIDE OF S.G. AND      633.00  Yes Boundeg Spectrum vs SSE Ground    Yes    Yes    Yes      Yes DISTRIBUTION PANEL VDCO-1                          AVXFEED PUMP CONTROL PANEL &#xb9;14G, ON                            Response Spectrum THE N WALL 29    14    1-VDCD-2    0  250V DG DISTR I 250V DG          AUXILIARY        CONTROL RM, BEHIND S.G. AND AFW PUMP                    Boundeg Spectrum vs SSE Ground    Y8$    Yes              Yes    YBS DISTRIBUTION PANFL VDCO-2                          CONTROL PANEL &#xb9;14G, ON THE N WALLOF                            Response Spect/um THE RM 30    15    1 43ATT-AB      250V Dc DISTRIBUTIONI PLAN'r    AUXILIARY        AB BATT EQUIP AREA, IN THE CENTER OF THE  609.00  Yes Boundeg Spectner vs SSE Ground    YBS      No    Yes              No BAlTAB                                            IU/L S OF THE PARTITION WALL                                  Response Spectnsn 31    '15  1-BATT%0        250V DC DISTRIBUIONI PlANT      AUXILIARY        CD BATT EQUIP AREA. IN THE CENTER OF THE  650.00  Yes Boundeg Spectrum vs SSE Ground    Yes                      Yes BATT CD                                            N END OF THE RM                                                Response Spectrum 32    15    1 WATT&    0  250VDC CONTROL AND I I TRAIN N  AUXILIARY          HALLWAY,                                                Brxedeg Spectrum vs SSE Ground    Y8$
PLANT BATfERY                                                                                                    Response Speci/um Certification:
Ail the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All.signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
Print or Type Name Si Signature                          Date                    Print or Type Name 4 eEL            Signature                  Date
 
Walkdown:    1/.      of 11/8/93                                                                    DC CO          IT 1                                                                                Page1of6 SCREENING VERIFICATION DATA SHEET (SVDS) item  Eq Ci    Eqtxp.iD  Rev      Srstern/Equipment Descnpten        Buddng. Fker              Room or Row/Cohmn                Base                  Capacsy vs.              Cap>    Cavests    Interact Equp No.      No                                                    Elsv.                                              Eiev.                Demand Bash              Dan and?  OK?    OK?  OK?    OK?
7    14:Rv<10      0  COW/ DEMINERALIZEDMAKEUP              AUXILIARY  650.00  HALLWAY,                                            N/A  1.5 x Boundsvg Spectrum vs.                Yss        Yss    Yes WATER TO CCW SURGE TANK        'A'.5                                                                              Reassdc Masan Centered Floor AIR OPERATEO SHUTOFF                                                                                                Response Spectra VALVE 2      7    1<RV<11      0  CCW/ DEMINERALIZEDMAKEUP              AUXILNRY  650.00  HALLWAY,                                                  1.5 x Bounang speci/um vs.                              Yes WATER TO CCW SURGE TANK'Ir                                                                                        Reassdc Median Centered Fker 1.5 AIR OPERATED SHUTOFF                                                                                                  Response Spectra VALVE 3      7    WICR401      0  NUCLEAR SAMPLING I STEAM                          591.00  VESTIBULE. ON THE E END, BELOW THE                  N/A  1.5 x Boundng Spectrum vs.                Yes    NIA  Yes GENERATOR I SLOWDOWN                                      PIATFO RM GRATING.                                      Rear>>tie Median Centered Boor SAMPLE DSRMI CONTAINMENT                                                                                                  Response Spectra ISOLATIONVALVE 7    1&CR402      0  NUCLEAR SAMPLING I STEAM              AUXILIARY  591.00  VESTIBULE. ON THE E END, BELOW THE                  N/A  1.5 x Boundeg Spectrum vs.                  Yes        Yss    Yes GENERATOR 2 SLOWDOWN                                      PtATFORM GRATING.                                        Reafstic Mafian Centered Fker SAMPLE DSR~ CONTAINMENT                                                                                                  Response Spectra ISotATION VALVE 5      7    1-DCR403      0  NUCLEAR SAMPLING I STEAM              AUXILIARY  591.00  VESTIBULE, ON THE E END, BELOW THE                  N/A  1.5 x Boundstg spect/um vs.                      N/A  Yes GENERATOR 3 SLOWDOWN                                      PLATFORM GRATING.                                        Rsaasgc Median Centered Boor SAMPLE DSR403 CONTAINMENT                                                                                                Response Spectra ISOtATION VALVE 6      7    14)CR~        0  NUCLEAR SAMPLING/STEAM                AUXILIARY  591.00  VESTIBULE, ON THE E END, BELOW THE                  N/A  1.5 x Boundstg Spectrum vs.                            Yes GENERATOR 4 SLOWDOWN                                      PLATFORM GRATING.                                        Reahstic Mafian Centered Roar SAMPLE DSR404 COMTAIMMENT                                                                                                Response Spectra I SO lATIO N VALVE 7      7    14ICR410      0  SLOWDOWN / STEAM GENERATOR            AUXILIARY  591.00  STARTUP SLOWDOWN FLASHTANKRM. IN THE        587.00        1.5 x Boundeg Spect/um vs.                                      No OMEN.I SLOWDOWN                                          SE PART OF RM, ON THE CONT WALLSIDE OF                  Rear>>dc Median Centered F ker CONTAINMENTISOLATIONVALVE                                THE 601 EL PLATFORM. 5 ABOVE THE                                Response Speci/a PLATFORM.
8      7    14ICRZ20          SLOWDOWN I STEAM GENERATOR            AUXILIARY  591.00  STARTUP SLOWDOWN FLASHTANKRM,IN THE        587.00        1.5 x Boundstg S pectrurn vs.      Yes      No                  No OME~ SLOWDOWN                                            SE REGN OF RM, OM THE CONT WALLSIDE OF                  Reahsdc Mafian Cenlered Fker CONT/uNMENT ISOLATIONVALVE                                THE 601 EL PlATFORM, 5 ABOVE THE                                Response Spectra PlATFORM.
9      7    14ICR430      0  SLOWDOWN/STEAM GENERATOR              AUXILIARY  59 l.00 STARTUP SLOWDOWN FlASHTANKRM. IN THE        587.00        1.5 x Bouixsng Spect/um vs.                Yes        Yes OMM4 SLOWDOWN                                            SE REGN OF THE RM. ON THE CONT WALL                      Real>>dc Maf>>n Centered Fker CONTAINMENTISOLATIONVALVE                                SIDE OF 601 Et PlATFORM, 5'ABOVE THE                            Response Spectra FUL 10      7    14ICR440      0  SLOWDOWN / STEAM GENERATOR            AUXILIARY  591.00  STARTUP BLOWDOWN FlASHTANKRM, IN THE        587.00  NIA  1.5 x Boundeg Spectrum vs.        Yes OME~ SLOWDOWN                                            SE REGN OF THE RM. ON THE CONT WALL                      Real>>tic Median Centered Fker CONTAINMENTISOlATION VALVE                                SIDE OF THE 601 EL PlATFORM, 5'BOVE                            Response Spectra THE FLR.
I'I    7    1&CRQ14      0  NITROGEN (REACTOR PL/                  AUXILIARY 591.00  STARTUP SLOWDOWN FLASHTANKRM, IN SE                      1.5 x Bounang Spectrum vs.        Yes NITROGEN SUPPLY TO                                        REGN OF RM, NEAR CONT PENETRATION    &#xb9;I-                Rear>>dc Mafran Centerai Floor ACCUMVLATORTANKS                                          CPM42, 5'BOVE THE 601 EL PlATFORM.                              Response Spectra CONTAINMENTISOlATION VALVE 12    7    I-IRV-260    0  SAFETY INJECTION/ SAFElY              AUXILIARY  587.00  N SAFETY INJECTION PUMP RM,  5'E  OF N      587.00        1.5 x Boundsvg Spectrum vs.
INJECTION TEST LINE SHUTOFF                              V&#xb9;2 Sl PUMP. IN THE NE CORNER OF THE RM.                Rear>>5c Masan Centered Fker 0.75 AIR OPERATED VALVE                                  3'BOVE FLR                                                      Res      Spectra Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or Type Name                                      Signature                        Date                    Print or Type Name                                Signature                Date
 
Walkdown: V.            of 11/6/93                                                            DC CO        NIT 1                                                                                        Page2of6 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. CI    Equp. ID  Rev    System/Equpment Descnptxa                F ker                                                                          Capscrty vs.            Cap >  Caves'.s          Equp No.      No                                              Elev.                                                                        Demand Basis            Dam snd7  OK r    OKT      OK'7 13            14ICR-251    0  NUCLEAR SAMPLING/ STEAM          AUXILIARY 591.00 VESTIBULE, IN E REGN OF RM, ON THE 596 EL                      1.5 x Boundstg Spectnm vs.                  Yes    N/A GENERATOR 1 STEAM SAMPLE                          PLATFORM, 1'NDERNEATH THE 601 ELEV.                          Rear>>tic Matin Centered Floor MSX-101 0.5 AIR OPERATED                          PLATFORM.                                                            Response Spectra CONTAINMENTISOLATIONVALVE 14            14ICR-252    0  NUCLEAR SAMPLING/STEAM          AUXILIARY 591.00 VESTIBULE. IN E REGN OF RM. ON THE 596                        1.5 x Boundstg Specaum vs.          Yes      Yes              Yes GENERATOR 2 STEAM SAMLPE                          ELEV. PLATFORM, 1'NDERNEATH THE 601                          Reahtic Median Centered Fker MSX-102 0.5 AIR OPERATED                          ELEV. PLATFORM.                                                      Response Spectra CONTAINMENTISOLATIONVALVE 15            14ICR-253    0  NUCLEAR SAMPLING/STEAM          AUXILIARY 591.00 VESTIBULE. IN THE E REGN OF RM, ON THE                        1.5 x Boundstg Spectrum vs.        Yes      Yes              Yes GENERATOR 3 STEAM SAMPLE                          596 ELEV. PlATFORM, 1'NDERNEATH THE                          Rear>>tic Merfran Centered Fker MSX-103 0.5 AIR OPERATED                          601 ELEV. PLATFORM.                                                  Response Spectra I
CONTAINMENT SO lATI ON VALVE 16            141 CR-254    0  NUCLEAR SAMPLING / STEAM        AUXILIARY 591.00 VESTIBULE, IN THE E REGN OF RM, ON THE                        1.5 x Boundstg Spectnm vs.          Yes      Yes        Yes  Yes GENERATOR 4 STEAM SAMPLE                          596 ELEV, PLATFORM. 1'NDERNEATH THE                          Realistic Median Centered Floor MSX-104 0.5 AIR OPERATED                          601 ELEV. PLATFORM.                                                  Response Spectra CONTAINMENTISOlATIONVALVE 17            I47 RV-251    0  CVCS/ SEAL INJECTION WATER      AUXILIARY 587.00 RECIPROCATING CHARGiNG PUMP RM, IN THE                        1.5 x Boundrng Spectnm vs.          Yes      Yes    N/A  Yes FLOW2 AIR OPERATED CONTROL                        SW REGN OF THE RM. S W OF                                    ReaMc Median Centered Fker VALVE                                            RECIPROCATING CHG PP, 5'BOVE FLR                                    Response Spectra 18            1<RV411      0  CVCS (BORON MAKEUP) / NORTH      AUXILIARY 587.00 BORIC ACID STORAGE TANKAREA, IN NE                            1.5 x Boundstg Spect/um vs.        Yes      Yes    N/A        Yes BORIC ACID FILTER TO CVCS                        REGN OF RM. 4' OF N BAST 1-TK-12N,                            Ressstic Mtxfisn Centered Floor CHARGING PUMPS AND NORTH                                FLR.                        4'BOVE Response Spectra BORIC ACID BLENDER 1 AIR OPERATED FLOW CONTROL VALVE 19            1-SV-101    0  NITROGEN (REACTOR PL /          AUXILIARY 591.00 STARTUP BLOWDOWN FLASHTANKRM. 18 FT                      N/A  1.5 x Boundrng Spectrum va                  Yes        Yes  Yes NITROGEN SUPPLY HEADER TO                        NORTH OF THE SO. WALI 601 ELEVATION                          ResMc MIKrisn Centered Fker ACCUMULATORTANKS SAFETY                          PLATFORM, BELOW CPN42                                                Response Spectra VALVE 0  CCW/1&RA~ SAMPLE HEAT            AUXILIARY 591.00 STARTUP SLOWDOWN FLASHTANKRM, 10 FT                      N/A  1.5 x Boundeg Spectnm vs.          Yes      Yes        Yes EXC HANGERS CCW RETURN                            NW OF THE VESTIBULE DOOORWAY                                  Rear>>dc Mtxf>>n Centered Fker HEADER SAFETY VALVE                                                                                                    Response S      8 21              1$ V45      0  CVCS/CHARGING PUMPS                        587.00 RECIPROCATING CHRG PMP RM. AT THE NW                    N/A  1.5 x Bounding Spectrum vs.        Yes      Yes        Yes SUCTION HEADER SAFHY VALVE                        CORNER OF THE RECIPROCATING CHARGING                          Realsdc Median Centered Fker PUMP <<I+P49.8 FT ABOVE THE FLR                                      Res por>>e S 0  COMPONENT COOLING WA/            AUXILIARY 650.00 HALLWAY,IN THE NW PART OF THE HALLWAY,                        1.5 x Boundrng Spectnm vs.          Yes      Yes        Yes  Yes COMPONENT COOLING WATER                          ON TOP OF THE CCW SURGE TANK 1-TK47                          Reahsdc Median Centered Fker SURGE TANKTK47 SAFHY VALVE                                                                                            Response Spectra 1<V%6      0  COMPONENT COOLINGWA/CCW          AUXILIARY 587.00 HALLWAY,10 FT ABOVE NORTH BORIC ACID                    Yes  Boundstg Spectrum vs. SSE          Yes      Yes    N/A  Yes  Yes TO NORTH BORIC ACID EVAP                          EVAPORATOR RM DOOR. NORTH OF THE 598                          Ground Response Spectnm DRUM 12+IE-19ON SAFETY VALVE                      EL PLATFORM.
24            1<V-72W      0  COMPONENT COOLING WA/WEST        AUXILIARY 633.00 HALLWAY.20 FT SOUTH OF THE N-TRAIN                            1.5 x Boundng Spectrum vs.                              Yes RESIDUAL HEAT REMOVALHEAT                        BATTERY RM. ON THE SE PART OF THE 645                        Realistic Median Centered Floor EXCHANGER COMPONENT                              ELEVATION PlATFORM, NEAR THE EAST WALL                              Response Speci/8 COOLING WATER OUTLET SAFETY VALVE 25                          0  REFUELING WATER STOR / SAFETY    AUXILIARY 587.00 N SAFETY INJ PMP RM, 3 FT SE OF THE PUMP,                      1.5 x Boundrtg Specuum vs.          Yes      Y8$        Y8$
INJECTION PUMPS SUCTION                          5 FT ABOVE THE FLR                                            Real>>tic Median Centered Fkor HEADER SAFETY VALVE                                                                                                    Response S      8 Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
tzr'(      c~g Print or Type Name                              Signature                        Date                          Print or T pe Name                                Signature                Date
 
Walkdown:      trt/      f 11/8/93                                                                                              DC CO          IIT 1                                                                                Page 3 of 6 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl    Equip ID  Rav      system/Equpmafx Description                                            Fker              Room or Row/Coksnn                  Base                Capacity vs.            Cap > Caveats              Eque No.      No                                                                              Elev.                                                Elev.              Demand Basis            Demand?  OK?    OK?          OK?
1<v-98N    0  SAFETY INJECTION /NORTH                                        AUXILIARY    587.00 N SAFETY INJ PMP RM, 5 FT NE OF THE EAST                  1.5 x Bounding Spectnsn vs.                      WA            Yes SAFETY INJECTION PUMP PP-26N                                                      END OF THE PUMP, IN THE NE CORNER OF                      ROOMc Moffian Centered Fbor DISCHARGE HEADER SAFETY                                                            THE RM                                                          Response Spectra VALVE 27              1<v-985    0  SAFETY INJECTION/SOUTH                                        AUXILIARY    587.00 S SAFETY INJ PMP RM. 4 FT EAST OF THE                      1.5 x Boufxfing Spoctfufn vs.              Yes  N/A          Yes SAFETY INJECTION PUMP PP-26S                                                      SOUTH SAFETY INJECTION PUMP &#xb9;14fp-268                    ROOMc Mtxfian Centered Fbor DISCHARGE HEADER SAFETY                                                                                                                            Response Spectra VALVE 28              1247RV-    0  CVCS/NORTH BASTTK-12N2 AIR                                    AUXILIARY    587.00 BORIC ACID STORAGE TANKAREA,INNE                      N/A  1.5 x Bounding Spectrum  vs.            Yes    N/A 410          OPERATED INLET FLOW CONTROL                                                        REGN OF RM. 3'E  OF N Bofuc ACID                        Rearfsuc Median Centered  Fkef VALVE                                                                              STORAGE TANK 1.TK-1 2N. 4'BOVE FUL                              Res        S 1242RV-    0  CVCS (BORON MAKEUP)/MIDDLES                                    AUXILIARY    587 00 BORIC ACID STORAGE TANKAREA,IN MIDDLE          587 00      1.5 x Boundrig Spectrum  vs.                    N/A          Yes 420          BAST TK-12M 2 AIR OPERATED                                                        E REGN OF RM,  3'E  OF MIDDLEBAST 12-TK-                  Reassuc Mofsan Centered    Fker INLET FLOW CONTROL VALVE                                                          12M. 2'BOVE FUL                                                  R          6 1 4;CM451    0  CCW/ REACTOR COOLANT PUMPS                                    AUXILIARY    591.00 STARTUP BLOWDQWN FLASHTANKRM, 12'E            587.00      1.5 x Bounding Spectrum  vs.              Yes  N/A          Yes BEARING OIL COOLERS CCW                                                            OF STARTUP BLOWDOWN FLASHTANK&#xb9;1.TK-                      Reafisdc Meffian Centered  Floor RETURN HEADER                                                                      49, ON THE 596 EL PLATFORM.                                      Response Spectra 8 MOTOR
                                                  'A'ONTAINMENT OPERATED ISOlATIONVALVE 31            1CCM452      0  CGW/ RC PUMPS BEARING OIL                                      AUXILIARY    591.00 STARTUP SLOWDOWN FLASHTANKRM. Zrr NE          587.00 N/A  1.5 x Boundrig Spectrum vs.                                    Yes COOLERS CCW RETURN HEADER                                                          OF STARTVP BLOWDOWN FlASHTANK&#xb9;1.TK                        Realistic Moffian Centered Fbof
                                'Iy CONTAINMENT8 MOTOR                                                            49, ON 596 EL PLATFOIU/L                                        Response Spectra OPERATED ISolATIONVALVE 1CCM453      0  CCW/ RCP THERMALBARRIER                                        AUXILIARY    591.00 STARTUP SLOWDOWN FLASHTANKRM. 12'E            587.00      1.5 x Bounding Spectrum vs.                Yes        Yes      Yes CCW OUTLET 'A'ONTAINMENT4                                                          OF THE WALKWAYOVER THE PIPE TUNNEI                        Rearfsdc Mfxfisn Centered Fker MOTOR OPERATED ISOlATION                                                                  THE 596 EL PLATFORM.            1'BOVE Response Spectra VALVE 1CCM454      0  CCW/ RG PUMPS THERMAL                                          AUXILIARY    591.00 STARTUP SLOWDOWN FLASHTANKRM, 8 SE            587.00      1.5 x Bounding Spoctnxn vs.        Yes    Yes  N/A          Yes BARRIER CCW RETURN HEADER                                                          OF THE WALKWAYOVER THE PIPE TUNNEI                        Rearfstic Mecfan Centered Fker 4 MOTOR                      '8'ONTAINMENT 596 EL PLATFORM.                1'BOVE Response Spectra OPERATED ISOIATIONVALVE 0  CCW/CCWTO REACTOR                                              AVXII.IARY  591.00 STARTUP BLOWDOWN FLASHTANKRM. IS NW            587.00 N/A  1.5 x Bourxteg Spectrum vs.                      WA            Yos COOLANTPUMPS TRAIN                                                                OF SG STARTUP BLOWDOWN RASHTASK &#xb9;      1                Reasstic Moffisn Centered Fbor ISOLATIONVALVE  'A'ONTAINMENT TK49, NEAR PIPE TUNNEINEARFLR.                                  R          S      a 14CM459      0  CCW/ CCW TO REACTOR                                            AUXILIARY    591.00 STARTVP BLOWDOWNFLASHTANKRM,                              1.5 x Bounding Spectrum vs.                      N/A  Yes  . Yes COOLANT PUMPS TRAIN 'tr                                                                                                                      ROO5sdc Mfxssn Cantered    Roor CONT/uNMENT ISOlATIONVALVE                                                                                                                          Response S        a 14JVIO429    0  CCW/WEST RHR HEAT                                              AVXII.IARY  633.00 HALLWAY,                                                  1.5 x Bounding Spectrum vs.                                    Yos EXCHANGER HE-1?W CGW OUTLET                                                                                                                  Resinic Median Cantered Roor SHUTOFF VALVE                                                                                                                                      R          S      a 37            1+MD-221    0  AUXFEDWATER/TURBINE DRIV                                      AUXILIARY    591.00 STARTUP BLOWDOWN FlASHTANKRM. 18 S                        1.5 x Boundffe Spoctfl&#xc3;l va.              Yos                  Yes AUXFEED PUMP PP4 DISCHARGE                                                        OF THE N WALLON THE E SIDE OF THE PIPE                    ROOMC Mfxfian Cantered Fker TO STEAM GENERATOR OMEW2 4                                                        TUNNEI3' OF THE WALKWAYOVER THE                                Response Spectra MOTOR OPERATED CONTROL                                                            PIPE TUNNEL VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
                                                                                                    ). K<
                                                                                                                    ~)      /2/i(o/s~
Print or Type Name                                                            Signature                          Date                    Print or T pe Name                                  Si nature              Date
 
Waikdown: I/              f 11/8/93                                                            DC CO          IIT 1                                                                                  Page4of6 SCREENING VERIFICA            N DATA SHEET (SVDS)
Item  Eq. Gl    Equ(p.lo    Rev                                              Fxxx              Room or Row/Colxnn                                    Capac(ty vs.              Cap>  Caveats Anchor Interact No.      No                                              Bev.                                                                    Demand Basis            Demand?  OK'?    OK?    OK?    OK?
38      8    1-FMO-222      0  AVXFEEDWATER I EAST MOTOR      AUXILIARY  591.00 STARTUP BLOMXWWFLASHTANKRM, 1I7 S          587.00  N/A  1.5 x B(xxtd(ng 8 pectrum vs.              Y85    N/A DRIV AVXFEED PUMP PP4E                            OF THE NWALI ON THE E SIDE OF THE PIPE                  Raasstic Mtxf(an Centered Floor SUPPLY TO STEAM GENERATOR                        TUNNEL 12' OF THE N END WALL                                    Response Spectra OME3-24 MOTOROPERATEO CONTROL VALVE 39      8    I.FMO-231      0  AUX FEEOWATEERI TVRBVNE        AUXILIARY  591.00 STARTUP BLOWDOWN F LASHTANKRM, ON          587.00  N/A  1.5 x Boundeg Spectrum vs.                Yes                  Yes DRIV AUX FEED PPQ PUMP                            THE N END OF THE RM, ON THE E SIDE OF                    ROOMc MaSan Centered Floor SUPPLY TO STEAM GENERATOR                        THE PIPE TUNNEL 7' OF THE N END WALL                            Response Spectra OME 34 4 MOTOR OPERATED CONTROL VALVE I+MD.232      0  AUX FEEDWATER I EAST MOtOR      AUXILIARY  591.00 STARTUP BLOWDOWN FLASHTANKRM. IN THE      587.00  N/A  1.5 x Boundeg Spectrum vs.                Yos    N/A    Yes    Yes DR IVAUX FEED PUMP PP4E                          NW AREA OF THE RM, ON THE E SIDE OF THE                  Rear(sdc Median Centered Fker SUPPLY TO STEAM GENERATOR 3-                      PIPE TVNNEI 3' OF THE N END WALL                                Response Spectra 3 4 MOTOR OPERATED CONTROL VALVE 41      8      I -ICM-260    0                    I SAFHY INJECTION NORTH          AUXILIARY        N SAFETY INJECTION PUMP RM, 5' OF THE E    587.00  N/A  1.5 x Bound(ng Spectrum vL                Yos                  Yes SAFHY INJECTION PUMP PP-26M                      END OF N SAFHY INJECTION PUMP I+P-26N,                  Raatstic Me(rien Centered Fker DISCHARGE CONTAtNMENT                            3'BOVE FLR.                                                    Response Spectra ISOLATION4 MOTOR OPERATED VALVE 42      8      I ICM-265
                  ~          0  SAFETY INJECTION/ SOUTH          AUXILIARY        S SAFETY INJECTION PUMP RM, IN SE PART      587,00  N/A  1.5 x Bound(ng Spectrum vs.        Yos    Yes            Yes    Y8$
SAFETY INJECTION PUMP PP-26S                      OF RM. 5'E OF S SAFETY INJECTION PUMP 1-                Rear(sdc Me(F(an Centered Fker DISCHARGE CONTAINMENT                            PP-26S, 3'BOVE FUL                                              Response Spectra ISotATION 4 MOTOR OPERATED VALVE I-ICMW        0  RHR I RECIRCULATION SUMP TO      AUXILIARY 591.00 VESTIBULE. INSIDE OF THE E REGIRG SUMP      587.00  N/A  1.5 x Bound(ng Spectrum vs.                Yos            Yos EAST RHR/CTS PUMPS SUCTION                                          &#xb9; VALVEINCLOSURE 1-TK44                                    Raaristic Mtxr(an Centered Fker CONTAINMENTISOLATION 18                                                                                          Response Spectra MOTOR OPERATED VALVE 0  RHR/RECIRCULATION SUMP TO        AUXILIARY 591.00 VESTIBULE, INSIDE OF THE W RECIRC SUMP      587.00  M/A  1.5 x Boundeg Spectrum vs,                Y8$            Yes    Yes WEST RHR/CTS PUMPS SUCTION                                        &#xb9; VLVENCLOSURE I-TK45                                      Rear(sdc Median Centered Fker CONTAINMENTISOlATION 18                                                                                          Response Spectra MOTOR OPERATED VALVE 45      8      I-040-261      0  REFUELING WATER STOR I TKM      AUXILIARY        N SAFETY INJECTION PUMP RM, T SE OF N S.L  587.00  N/A  1.5 x Boundeg Spectrum vs.          Yes    Y8$            Yos    Yes SUPPLY TO SAFHY INJECTION                        PUMP. IM THE SE CORNER OF THE RSL                        Rear(sdc Median Centered Fker PUMP SHUTOFF 8 MOTOR                                                                                              Response Spectra OPERATED VALVE 1-IMO-262      0  REFUELING WATER STORI SAFETY    AUXILIARY        S SAFElY NJECTION PUMP RM. IN NE AREA      587.00  N/A  1.5 x Boundng Spectrum vs.                                      Yes INJECTION PUMPS RECIRC TO                        OF RM. 3'E OF S SAFETY NJECTION PUMP  1~              ROSMc MaSan Cantered Boor REFUELING WATER STORAGE                          PP.26S, 3'ABovc FUL                                              Response Spectra TANKTK43 TRAIN 'A'HUTOFF 2 MOTOR OPERATED VALVE 47      8      1-IMO-263      0  REFUELING WATER STOR I SAFETY    AUXILIARY        S SAFETY INJEGTION PUMP RM, IN SE PART      587.00  N/A    1.5 x Boundeg Spectrum vs.                Yes    N/A    Yes    Yos INJECTION PUMPS RECIRC TO                        OF RM. 6' OF S SAFETY INJECTION PUMP 1-                  Raassdc Med(an Centered Fker REFUELING WATER STORAGE                          PP-26S, 3'BOVE FUL                                              Response Spectra TANKTK48 TRAN 13'HUTOFF 2 MOTOR OPERATED VALVE Ce'rtification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
Print or Type Name                                Signature                        Date                    Print or T pe Name                                Signature                  Date
 
Walkdown:
Item  Eq. Ci
              'fEqual iO No.
11/8/93 Rev No System/Equipment Descrsxon          Boring.
SCREENING VERIFICA Fkxx Elev.
DC C          NIT 1 N DATA SHEET (SVDS)
Room or Row/Goa/mn              Base Elev.
Cap >
Demand?
Caveats OK?    OK?
Page50f6 lnt8fact OK'I Equp OK?
48      8      1-9/IO-270  0    SAFETY INJECTION/ SAFETY              AUXILIARY        N SAFETY INJ ECTION PUMP RM,  5'E OF N                    1.5 x Boundng Spectrum vs.                                    Yes INJECTION PUMPS DISCHARGE                              SAFETY INJECTION PUMP I+P-26N, NEAR S                    Reafstic Marriagc Ceracred Floor CROSSTIE TRAIN 'A'HUTOFF 4                              WALI3'BOVEFLIL                                                  Response Spectra MOTOR OPERATED VALVE 49      8    1-IMO-275    0    SAFElY INJECTION I SAFElY              AUXILIARY        S SAFETY INJECTION PUMP RM, IN SE PART                    1.5 x Bounchrg Spectrum vs.                                  Yes INJECTION PUMPS DISCHARGE                              OF RM. S S OF S SAFETY INJECTION PUMP 1-                ReafratiC Median Centered Fker CROSSTIE TRAIN O'HUTOFF 4                              PP-26S, NEAR S WALI3'ABOVEFLR.                                  Response Spectra MOTOR OPERATED VALVE 50      8    1-IM0460      0    SAFETY INJECTION I SAFETY              AUXILIARY        W CENTRIFUGAL CHARGING PUMP RM, ON                        1.5 x Boundng Specuum vs.                              Yes    Yes INJECTION PUMPS To Cvcs                                THEMIDDLEOFTHEWWALI 3FTWOFW                              Reassdc Median Centered Roar CHARGING PUMPS SUCTION                                  CENTRIFUGAL PP. 4 FT ABOVE FLR                                  Respcnse Spectra HEADER CROSSTIE SHUTOFF VALVE 51      8    1-IMO361      0    SAFETY INJECTION/SAFETY                AUXILIARY        N SAFETY INJECTION PUMP RM, 3' OF  W                      1.5 x Boundng Specuum vs.        Yes    Yes                  Yes INJECTIOM PUMPS SUCTION TO                              END OF N SAFHY INJECTION PUMP.                          Rearnuc Median Centered Roar AND FROM CHARGING PUMPS                                                                                                  Response Spectra SUCTION 'A'HUTOFF 4 MOTOR OPERATEDVALVE 52      8    1-0/IO462    0  SAFETY N/ECTION I SAFETY                AUXILIARY        N SAFElY INJECTION PUMP RM, 3' OF                        1.5 x Brxndng Spectrum vs.                Y88          Yes IMJECTIOM PUMPS SUCTION TO                              MIDDLEOF N S.l. PUMP, 3'BOVE FLR.                        Realistic Med/sn Centered Fker AND FROM CHARGING PUMP 'If                                                                                                Response Spectra SHUTOFF 4 MOTOR OPERATED VALVE 8    1-IMO~        0  RHR I RWST TK43 TO RHR PUMPS SUCTION SHUTOFF 12 MOTOR AUXILIARY 591.00 VESTIBULE. 2'E  OF THE VESTIBULE'S                N/A  1.5 x Boundng Spectrum vs,        Y8s    Yes          Yes DOORWAY, S OF THE VALVETANKS.                            Reafrsdc Merfran Centered Fkor OPERATED VALVE                                                                                                            Response Spectra 54      8    I -IMO-910    0  CVCS I RWST TO CHARGING PUMP            AUXILIARY        E CENTRIFUGAL CHARGING PUMP RM, 5 FT                N/A  1.5 x Boundng Spectrum vs.        Yes    Yes          Y88 SUCTION SHUTOFF VALVE                                    NW OF RECIPROCATLNG CHG PP, NEAR W                      Realistic Median Centered Fkor WALLSFT ABOVE THE FLR                                            Response Spectra 55      8    1-IMO-911    0  GVGS I RWST TO CHARGING PUMP            AUXILIARY        E CENTRIFUGAL CHARGING PUMP RM. IN THE      587.00        1.5 x Boundng Spectrum vs.        Yes          N/A  Yes SUCTION SHUTOFF VALVE                                    NE PART OF THE RM, 3 FT E OF E                          Resfistic Median Centered Fkxx CENTRIFUGAL CHG PP, 3 FT ABOVE THE FLR                          Response Speci/a 56      8    14?CM450      0  REACTOR COOLANT PUMP I RCP              AUXILIARY        VESTIBULE. AT THE NE PART OF 601 Et                      1.5 x Bcxndclg speci/um vs.                      N/A SEAL WATER RETURN                                        PLATFORM                                                Reafistic Med/an Centered Fkxx ISOLATION 4
                                                        '8'OMTAINMENT Response Spectra MOTOR OPERATED VALVE 57      8    14?MO-200      0  CVCS/CHARGING To                        AUXILIARY        RECIPROCATING CHARGING PUMP RM, IN THE      587.00  N/A  1.5 x Boundng Speci/um vs.                            Yes REGENERATIVE HEAT EXCHANGER                              NE CORNER OF THE RM. 4 FT NE OF                          Reahsdc Madan Centered Fkor
                                'A'HVl'OFF VALVE                                        RECIPROCATING CHG PUMP, 4 FT ABOVE THE                          Response Spectra FLR 58      8    14?MO-201      0  GVCS I CHARGING TO                      AUXILIARY        RECIPROCATING CHARGING PUMP IV/L IN THE    587.00  N/A  1.5 x Boundng Spec/utn vL                              Yes    Yes REGENERATE HEAT EXCHANGER                                NE REGN OF THE RM, 4 FT E OF                            Reahsdc Merfian Centered Fkxx
                                'Ir SHUTOFF VALVE                                        RECIPROCATING CHG PP, NEAR E WAU4 FT                            Response Spectra ABOVE THE FLR 59      8    1 42MO-225    0  CVCS I EAST CENTRIFUGAL                AUXILIARY        W CENTRIFUGAL CHARGING PUMP RM. IN NW      587.00        1.5 x Boundng Spectrum vs.                      N/A CHARGING PUMP MINIFLOW TO                                AREA OF RM, ON THE W WAU3 FT W OF W                    R885sdc Mersan Centered Fkor RCP SEAL WATER HEAT                                      CENTRIFUGAL CHG PP, 4 FT ABOVE FLR                              Response Spectra EXCHANGER HE 11 2 MOTOR OPERATED SHUTOFF VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "AIIinformation" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
iZ ((~~~s Print or Type Name                                        Signature                      Date                      Print or Type Name                                Si nature                Date
 
Walkdown: V              11/6/93                                                              DC CO          IT 1                                                                              Page6of6 SCREENING VERI.IICATI              DATA SHEET (SVDS) kern  Eq. Cl  EqtsP.ID  Rev    System/Equipment Descryten              Fkxx              Room or Raw/Cok/mn                                                            Cap >  Caveats    kxefact Equp No. No                                              Elev.                                                                                          Dam and7  OK7    OK7  OK7  OK7 60      8    147MO-226      CVCS I WEST CENTRIFUGAL          AUXILIARY 587.00 W CENTRIFUGAL CHARGING PUMP RM. IN NW    587.00  NIA    1.5 x Boundmg Spectrum vs.        Yes      Yes                Yes CHARGING PUMP MINIFLOW TO                        AREA OF RM, 3 FT WOF W CENTRIFUGAL CHG                Rearrttio Median Centered FkXX RCP SEAL WATER HEAT                              PP,4 FT ABOVE FLR                                            Response Spectra EXCHANGER HE-11 2 MOTOR OPERATED SHUTOFF VALVE 61      8    147M~10    0  CVCS I EMERG. BORATION TO        AUXILIARY 587.00 BORIC ACID S'roRAGE TANKAREA. IN NE      587.00  N/A    1.5 x Boundrng  Spectrum vs.      Yes      Yes        Yes CHARGING PUMP SUCTION                            PART OF RM, 3' OF N BORIC ACID STORAGE                Reasstic Median  Centered Fhor SHUTOFF VALVE                                    TANK 1-TK-1 2N. 2'BOVE FLIL                                  Re        Spectra 8      1-VVMO-      ESW/ EAST CONTAINMENTSPRAY      AUXILIARY        HALLWAY,                                                1.5 x Boundstg  Speci/um vs.      Yes            NIA  Yes 711        HEAT EXCHANGER HE-18E ESW                                                                                Realatio Med'en  Centered Fkxx INLET 12 MOTOR OPERATED                                                                                        Response  Spectra SHUTOFF VALVE 1.WMO-    0  ESWI WEST CONTAINMENTSPRAY      AUXILIARY 633.00 HALLWAY,                                                1.5 x Bouncrstg Spectrum vs.      Yes            NIA  Yes    Yes 715        HEAT EXCHANGER HE-I8W ESW                                                                                Rearsdc Median Centered Floor INLET 12 MOTOR OPERATED                                                                                        Response Spect/a SHUTOFF VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "AII information" includes each entry and conclusion (whether verified to be seismicaily adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
0      '/<<        /es Print or Type Name                            Signature                        Date                  Print or T pe Name                                Si nature                Date
 
Walkdown: 11/17/93 & 4/11/94                                                                    DC COOK UNIT 1                                                                                    Page1 of1 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl  Equp.lo    Rev                                              Floor                Roonl or Row/cohsnn                                  Capacity vs.
Demand Basis Cap>>  Caveats Anchor Interact OK'?
E~
No. No                                              Elev.                                                                                          Demand?  OK?    OK?            OK?
0  CCW I LETDOWN HEAT                                633 HALLWAY.20 FT. NORTH OF THE FREIGHT      633.00  Yes  ouunctvtg spectrum vs. ssE                    NIA            Yes EXCHANGER HE-1 4 CCW OUTLET                        ELEVATOR, 12 FT. ABOVE FLOOR.                            Ground Response Spectrum SAFETY VALVE 142 RV-1 70  0  CVCS I EXCESS LETDOWN HEAT    CONTAINMENT 612.00  REGENERATIVE HEAT EXCHANGER RM, ON          612.00  Yes  Boundrtg Spectrum vs. SSE                                    Yes EXCHANGERHE-131 AIR                                THE CONTNMENTWALLSIDE OF THE RM,                          Ground Response Spectrum EXCESS LETDOWN HEAT EXCHANGER 1'ROM OPERATED OUTLET PRESSURE CONTROL VALVE                                      0 14IE-13. 2'ABOVE THE FLR I+RV I? I    0  CVCS I EXCESS LETDOWN HEAT    CONTAINhtENT el 2.00 REGENERATIVE HhAT EXCHANGER Rl I, ON Tl& 012.00      Ya  Botstttstg S pecuum vs. SSE            Ycs    N/A            Ya EXCHANGER HE.I 2 I AIR OPERA                      coNTNMENT wALLsIDE oF THE RhL I'ROhl                      Ground Response Spectrum OUTLET DIVERSION VALVE                            EXCESS LHDOWNHEAT EXCHANGER 6 I-HB I 2 2 ABOVE nts FLR Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SR%) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
(  J(      AC Print or T      Name                          Si nature                            Date                    Print or Type Name                            Si nature                  Date
 
4 Walkdown: Week of 3lt4/94                                                                  DC COOK UNIT 1                                                                                      Page    1 of 1 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl  Equ&#xb9;t.to        SrstomlEqtspment Descnptton    BuSdtng. Floor            Rocm or Row/Cohmn                                                            Cap >  Caveats Anchor  Interact  Equp Na                                                      Elev.                                                                                        Demand?  OK?    OK?      OK?      OK?
1&RV441    0  NITROGEN (REACTOR PL I          CONTAINMENT 598.00  ANNULUS, QUAD. &#xb9;2, D2, F13,14. OK ON CONT            Yes  Boundstg Spearum vs. SSE              Y8$    NIA      Y8$      Y8$
NITROGEN SUPPLY TO                                  WALLSIDE OF WALKWAY,1'ROM COLUMN                          Ground Response Spectrum ACCUMULATORTANKS VENT TO                            &#xb9;22, 3'BOVE FLR.
ATMOS. VALVE 14V-102  0  I SAFETY REUEF VALVE            CON'rAINMENT 598.00 ANNULUS, QUAD 2                                      Yes  Boundstg Spectrum vs. SSE      Yos    Y85              Yos      Y85 Ground Re        S 14V-103  0  I SAFETY REUEF VALVE            CONTAINMENT 598.00  ANNULUS, QUAD 2                                          Boundeg Specuum vs. SSE              Y8$              Yos      Yes Ground Re        S 14V-122-  0  CCWI REACTOR SUPPORT            CONTAINMENT 598.00  ANNULUS QUAD 3, AZ:181 ON THE                        Yes  sculling Spearurn vs. SSE            Yes              Y85      Yes 37      COOLERS CCW RETURN HEADER                            CONTAINMENTWALLSIDE OF THE WALKWAY.                      Ground Response Spearum SAFHY VALVE                                          1 FOOT FROM COLUMN 21, NEAR THE CEILgIG.
7    14V42-    0  CCWI REACTOR COOLANT PUMP        CONTAINMENT 617.00  LOWER CONT, QUAD1                            625.00  Yes  Boundeg spearurn vs. ss E      Yes    Yes              Yos      Yes 1,2,3,4    PP45.1 g,3.4 THERMALBARRIER                                                                                    Ground Response Spectrum CCW OUTLET SAFElY VALVE 0  CCWI REACTOR COOLANT PUMP        CONTAINMENT 598.00  ANNULUS, QUAD2                                      Y8$  Ountaeg Spearum vs. SSE        Yes    Yos              Yes      Y8$
MOTORS BEARING OIL COOLERS                                                                                    Ground Response Spectrum CCW RETURN HEADER SAFElY VALVE 1&SO-21  0  REACTOR COOLANT SYST I          CONTAINMENT 622.00  REACTOR VESSEL HEAD AREA                    625 00  Yos  Berating 6 pocugn vs. SSE      Yos    Yes              Yos      Yos REACTOR VESSEL HEAD VENT 1                                                                                    Ground Response Spectrum SOLENOID VALVE 1+SO-22  0  REACTOR COOLANT SYST I          CONTAINMENT 622.00  REACTOR VESSEL HEAD AREA                                  Boundrtg Spearum vs. SSE      Yes    Yes    NIA      Y85      Yes REACTOR VESSEL HEAD VENT 1                                                                                    Ground Response Spectrum SOLENOID VALVE 1&SO-23  0  REACTOR COOLANT SYST I          CONTAINMENT 621.00  REACTOR VESSEL HEAD AREA                            Y85  Boundeg S pearum vL SSE        Yes    Yos              Yes      Yes REACTOR VESSEL HEAD VENT 1                                                                                    Ground Response Spectrum SOLENOID VALVE 10          1-NS0-24  0  REACTOR COOLANT SYST I          CONTAINMENT 621.00  REACTOR VESSEL HEAD AREA                    625.00  Yes  Boundkg Spectrum vs. SSE      Yos    Yes              Yes      Yes REACTOR VESSEL HEAD VENT 1                                                                                    Ground Response Spearum SOLENOID VALVE 19    1&TR420    0  REACTOR COOLANT I REACTOR        CONTAINMENT 617.00  LOWER CONT QUAD 2, AZ 132, BETWEEN THE      625.00  Yes  Boundrtg Spectrum vL SSE      Yes                    Yos      Yos COOLANTLOOP 2 COLO LEG WIDE                          RCP &#xb9;2 CTHE SHIELD WALI ON 617 El                        Ground Response Spectrum RANGE TEMP RECORDER                                  PLATFORM THERMALSENSOR 12                      0  CCWI EXCESS LETDOWN HEAT        CONTAINMENT 598.00  ANNULUS, QUAD3                                      Yes  Bcundrro Spearum VS. SSE                      NIA      Yes      Yos EXCHANGER HE-1 3 CCW OUTLET                                                                                    Ground Response S pectnsn SAFElY VALVE Certification:
All the information contained on this Screening VeriTication Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conduslons. One signatory should be a licensed professional engineer.)
                                                                                                                                                                                            /- za -g, Printor T pe Name                              S'ature                          Date                      Print or T pe Name                          Si nature                    Date
 
Walkdown:            of 9/26/94                                                              D.C.        /nit 1                                                                                  Page  1  of 2 SCREENING VERIFICA      N DATA SHEET (SVDS)
Eq.                    Rev              SystemfEquyment  escnpten                          Fker Elev      Room or RcwlccSumn    Base Ekrv. <4(7?    Capacsy vs.      Cap>>  Caveats        Interact    Equip CI                    No                                                                                                                          DemarxL Basis      Demaxl?  OK?    OK?      OK?      OK'7 16V67-2        0  CCWI NUCLEAR SAMPLING SAMPLE RACK A CCW            AUXILIARY              NUCLEAR SAMPLING RM. ON    587.00    Yes      Bound eg        Y8$    Yos            Yes        Yes RETURN HEADER SAFETY VALVE                                                UNIT 1 SAMPLE RACK A                        Spectrum vs. SSE LOCATED IM THE                              Ground Response NORTHWEST AREA OF THE                            Spectrum ROOM. NORTHER END OF THE RACK 1-SV676        0  CCWI NUCLEAR SAMPLING SAMPLE RACK 8 CCW            AUXILIARY              NUCLEAR SAMPLING RM - 0 N  587.00    Yes      Boundeg          Y8$          NIA                Yes RETURN HEADER SAFETY VALVE                                                UNIT 1 SAMPLE RACK B                        Spectrum vs. SSE LOCATED ON THE EAST END                    Ground Response WALL SOUTHERN END OF                            Spectrum THE RACK 1<G1        0  EQUIP CTRL AND INDIC I REACTOR PROTECTION          AUXILIARY              CONTROL RM. IN THE MIDDLE              NIA    1.5 x Boedeg                Yes  Yes                Yes CONTROL GROUP &#xb9;1 CABINET &#xb9;14.&#xb9;15. 8 &#xb9;18                                    OF THE SOUTH REGION OF                        Spectrum vs.
THE RM. ON THE SO. WALL                      RoaMdc Median Centered Fksor Response S 16G2        0  I REACTOR PROTECTION CONTROL GROUP &#xb9;2 CABINET      AUXILIARY              CONTROLRM,SWCORNER                            1.5 x Boundeg      Y8$          Yes                Yes
                                  &#xb9;lg                                                                        OF THE RM NEAR S WALL                          Spectrum vs.
                                                                                                            'FULL WALKDOWNDONE                          Reafntic Mode DURING RHR WALKDOWM.                        Centered Fkxx Response S        a 16G3        0  EQUIP CTRL AND INDIG/REACTOR PROTECTION            AUXILIARY              CONTROL RM, IN THE SE                        1.5 x Boundeg              Yes  Yos CONTROL GROUP &#xb9;3, CABINET &#xb9;20 AND &#xb9;21                                      REGION OF THE RM.                              Spectrum vs.
Rearrstic Median Centered Fkxx Response S 0  EQUIP CTRL AND INDIC I REACTOR PROTECTION          AUXILIARY              CONTROL RM, IN THE SE                        1.5 x Boundeg              Yos  Yes                Y8$
COMTROL GROUP &#xb9;4, CABINET &#xb9;22,&#xb9;28, &#xb9;24, 8 &#xb9;25                              REGION OF THE RM.                              Spectnan vs.
Rearist'>> Mersan Centered Fkxx Re        S      a 1-RPC-I      0  I REACTOR PROTECTION CHANNEL I CAB &#xb9;1              AUXILIARY              CONTROL RM, ON THE REAR                      1.5 x Boundeg                    Yos SIDE OF CONDENSATE                            Spacing  vs.
HEATER LEVEL CONTROL                        Reaasdc Median PANEL &#xb9;1. E OF                              Centered Fkor CONDENSATE PANEL REAR                      Response Spectra INSTRUMENT/RElAYRACK
                                                                                                            &#xb9;t&IL 14tPC il        I REACTOR PROTECTION CHANNEL II CABINET &#xb9;5          AUXILIARY              CONTROL RM, IN THE NE                        1.5 x Boundeg      Y8$          Yes                Yes REGN OF THE RM, OM THE                        Specaum vs.
REAR SIDE OF TURBINE                        Rearndc Mer&#xb9;an CONTROL PANEL &#xb9;t-T. NEAR                    Centered Fkcr TURBINE PANEL REAR                          Response Spectra INSTRUMENT/RELAYRACK
                                                                                                            &#xb9;I.TR.
141PG411          I REACTOR PROTECTION CHANNEL III CABINET &#xb9;10      AUXILIARY              CONTROL RM, IN THE NE                        1.5 x Boundeg      Yes    Y8$  Yes                No REGN OF THE RM, ON THE                        Speckum vs.
REAR SIDE OF STEAM                          Reasstic Median GENERATOR AND AUX FEED                      Centered Fkxx PUMP CONTROL PANEL    &#xb9;I-                  Response Spectra SG.
Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
i 2 /l~/vS Printor T pe Name                                  Signature                      Date                    Print or T pe Name                              Signature                    Date
 
Walkdown:    tI    of 9/26/94                                                              D.C. C      inlt 1                                                                                Page2of2 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq.      Equp. ID    Rev                                                                  Fiocr Elev. Room or Rowicotumn                      Cepscsy vs. csp >                        Equy CI                    No                                                                                                                          Demand. Basis  Dem end?          OK?          OK?
10            I +PMV        0  I REACTOR PROTECTION CHANNEL Iv CABINET &#xb9;12      AUXILIARY                  CONTROL RM, ON THE REAR                    1.5 x Boundstg                    Yes          No SIDE OF CONDENSATE                          Spectnsn vs.
HEATER LEVEL CONTROL                      Reeistic Median PANEL &#xb9;IN, NE OF                          Centered Floor CONDENSATE PANEL REAR                    Response Spectre INSTRUMENT/RELAYRACK
                                                                                                              &#xb9;1<IL Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT.AII signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
(z Pic/s; Print or Type Name                            Signature                        Date                      Printor T pe Name                          Si nature                      Date
 
APPENDIX 8 t
DONALD C. COOK NUCLEAR PLANT - UNIT.-2
                                    ~t SAFE SHUTDOWN EQUIPMENT LIST (SSEL}
FOR SEISMIC REVIEW
 
Donald C. Cook Nuclear Plant - Unit 2 SSEL Certification:
The information identifying the equipment required to bring the plant to a safe shutdown condition on this safe shutdown equipment list is, to be the best of our knowledge and belief, correct and accurate.
Name                          ~Si  n Ure                    ~Da e B. A. Svensson Operations G. P. Arent                                                          )g )g.q5 Operations J. V. Ruparel                                                      >~ /5 Systems H. W. Young Systems R. C. Steele                                                        12- ~~-%
Electrical T. R. Satyan Sharma                                                  Iz. g    gA Project Manager
 
1/8/96 12:4$ PM                        DONALD C. COOK NUCLEAR PLANT UNIT 0 2                                                                  Page      ((2
                                        ,SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR SEISMIC WALKDOWN Equip      Train  Equipment IO Rev                              System/ Equipment Decor! ptiOn              Buildine Boor Bev    Room or Row Col Clare                            No
  '0          12      124IE.1 9S  0      BORON RECOVERY (CVCS) SOU(H BORIC                    I              ANQUARY    587.00  S BOIUC ADO EVAP ACID EVAPORATOR SKID                                            RM 0          12      12+IE-25A    0                  RAQOACBVE WASTE EVAPORATOR                              AUXIUARY  587.00      15 GPM WASTE (1 SGPM)                        /15GPM RADIOACBVEWASTE                                  EVAP RM EVAPORATOR HE-25 CONDENSER 0          12      12+IE-258    0                  RADIOACBVEWASTE EVAPORATOR                              AUXLIARY  587.00      15 GPM WASTE (15GPMI I 15 GPM RADIOACBVEWASTE                                                          EVAP RM EVAPORATOR HE-25 QSBLLATE COOLER 0          12      12+IE45C    0                  RADQACBVEWASTE EVAPORATOR                              ANQUARY    587.00      15 GPM WASIE (15GPM) I 15 GPM RADIOACTlVEWASTE                                                        EVAP RM EVAPORATOR HE-25 CONCEN(RATES COOLER 24IRV.21 0  0      MAINSTEAM I STEAM GENERATOR OMEO-1                                AUXIUARY    633.00    E MANSTM SB3P STOP VALVE                                              ENCL 24rQ(V420            MHN SIEAM I STEAM GENERATOR OME4-2                                AUXIUARY    633.00    W MN STM STOP STOP VALVE                                              ENCL 24rIRV.230    0      MAINSTEAM I STEAM GENERATOR OMEN@                                  ALDQUARY    633.00    W MN STM STOP STOP VALVE                                              ENCL 246(V.240            MANSIEAM I STEAM GENERATOR OME~                                    AUXNJARY    633.00    E MANSTM STOP STOP VALVE                                              EHCL 24!ME~      0                  ESSENBAL SERV!GE WATER I EAST                        SCREENHOUSE  501.00  E ESSHIL SERV WTR ESSENTIAL SERVICE WATER PUMP PP-7E                                                            PMP RM DSCHARGE STRANER 24ME4AV      0  'SSENBAL                                      SERVICE WATER IWEST  SCREENHOUSE    591.00    W ESSNTL SERV ESSENBAL SERVICE WATER PUMP PP-7W                                                          WTR PMP RM QSGHARGE STRAINER 12      2444 E40    0              MHN STEAM I AUXNJARYFEED PUMP                              TURBINE    501.00      TB DRIVEN AUX TURBINE                                          FOWfR PMP 24rQV  1~    0          STARlWG AIR I P!t.OT OPERA1ED 4 WAY                            ALDQUARY    587.00    AB EMER OSL GEN VALVEFOR AIR START XRVS FOR QESEL                                                                  RM ENGINE 2~V 14D                  STARlWG HR I PILOT OPERATED 4 WAY                              AUXIUARY    587.00    CD EMER OSL GEN VALVEFOR AIR START XRVS FOR QESEL                                                                  RM ENGNE 24KlV.2vh8    0      Sl'ARTWG AIR SYSTEM I PILOT OPERATED                              AUXLIARY    587.00        AB DIESEL 4 WAYVALVEFOR HR START XRVS FOR                                                        GENERATOR ROOM DESEL ENGINE 2~V<4O        0      STARTWG HR SYSTEM I PILOT OPERATED                                ALSQUARY    587.00    CD EMERGENCY 4.WAYVALVEFOR AIR START XRVS FOR                                                      QESEL GENERATOR DESEL EHGNE                                            ROOM 12        24C  12    0          BORON MAKEUP(CVCS) SOUTH BORIC                  I              AUX6JARY    587.00    BORIC ADO SIQR AGIO ALTER                                        TANKAREA 24T 100kB      0      IXESELCOMBUSBQNAIRIABEMERGENCY                                      GROUNDS    600.00      INNER PLANT DESEL AIR INTAKEBLTER                                            GROUNDS 24T 10040      0      QESEL COMBUSBQH AIR I CD EMERGENCY                                  GROUNDS    600.00      INNER PLANT DESEL AIR Wl'AKEBLTER 24T.1 01  ~          QESEL COMBUSBON HR I AB EMERGENCY QESEL AIR WTAKESILENCER AUXIUARY    557.00 GROUNDS AB EMER DSL GEN RM 24T 10140      0      IXESEL COMBUSBQN AIR I CO EMERGENCY                                AUXIUARY    587.00    CD EMER DSL GEN DESEL AIR WTAKE SILENCER                                                    RM 24T 10448      0      QESEL COMBUSBQN HR I AB EMERGENCY                                  GROUNDS    609.00      NNER PLANT QESEL EXHAUST SILENCER                                              GROUNDS 24T 1044D            DIESEL COMBUSBON AIR I CD EMERGENCY                                GROUNDS    600.00      NNER PLANT QESEL EXHAUST SILENCER                                                GROUNDS 24T 112-AB    0      DIESEL LUBE QL I AB EMERGENCY DESEL                                ALBQUARY  579.00    AB EMER OSL LUBE FULL FLOW LUBE CXL FLTER                                                OIL PIT 24T 1124D    0      DESEL LUBE OL I CD EMERGENCY QESEL                                  ALDQUARY  570.00    CD EMER DSL LUBE RILLFlOW LUBC OIL FLTER                                                CXL 24T 113.A81    0      DIESEL LUBE OL I AB EMERGENCY QESEL                                            570.00    AB EMER OSL LUBE PB'UXUARY FUU. FLOW LUBE Oit. STRAINER Nt                                                      OIL PIT 24T 113482            QESEL LUBE CXL I AB EMERGENCY DIESEL                                AUXIUARY  570.00    AB EMER DSL LUBE FUlL FLow LUBE QIL sTRAINER rr2                                                      QL PIT 247.113401    0      DESEL LUBE OLICD EMERGENCY DESEL                                    AUXIUARY  570.00    CDEMERDSLLUBE FUll FLOW LUBE CXL STRAINER et                                                      OL PIT 24T 1134D2            QESEL LUBE OIL I CD EMERGENCY DESEL                            ~  AUXLIARY    570.00    CD EMER DSL LUBE FULL FLOW LUBE OIL STRANER rr2                                                      OIL PIT 24T 11048    0      DIESEL LUBE OL I AS EMERGENCY DIESEL                              AUXIUARY    570.00    AB EMER OSL LUBE LUBE OL HEA1ER TANK                                            OIL PIT 24T.11640          'IESEL LUBE OIL I CD EMERGENCY DESEL                                AUXIUARY    570.00    CD EMER DSL LUBE tUBE QL HEATER TANK                                            OIL PIT 247  11~    0      DESEL LUBE OIL I AB EMERGENCY DESEL                                ANQUARY    57LQO    AB EMER DSL LUBE BYPASS LUBE OL FLTER                                              OL PIT 24T 11840            DESEL LUBE OL I CD EMERGENCY QESEL                                ALBQUARY    579.00  CO EMER DSL LUBE BYPASS LUBE OIL BI.TER 24T.145481    0        DIESEL CONTROL AIR/ABEMERGENCY                                  AUXIUARY    557.00    AB EMER DSL GEN DESEL CONTROL AIR DRYER Pt                                                        RM 247.143%82              DESEL CONTROL HRI AB EMERGENCY                                  AUXIUARY    587.00    AB EMER OSL GEN DIESEL CONTROL AIR DRYER er2                                                    ! RM 24T 143401    0        DESEL CONTROL AIR/CD EMERGENCY                                    AUXLIARY    557.00    CD EMER OSL GEN DESEL CONTROL AIR DRYER St                                                        RM 24T.143402    0        DIESEL CONTROL AIR I CD EMERGENCY                                AUXIUARY    587.00    CD EMER OSL GEN DESEL COHlROL AIR DRYER rr2                                                        RM 24T.L 44AB    0      DESEL FUEL OL I AB EMERGENCY DIESEL                                AUXRJARY    587.00    AB EMER DSL GEN FUEL DL TRANSFER FILTER                                                    RM 24T 14440      0      DESEL FUEL OL I CD EMERGENCY DESEL                                AUXIUARY    587.00    CD EMER DSL GEN FUEL OL TRANSFER ADER                                                      RM 12      2-BC 253-1  0        CQNTRQLAIRIPRESSURI2ERTRAN'A'RESSURE CONTANMENT    612.00  LOWER CONT, OUAO REUEF VLVNRV.153 RESERVE                                  NO. 3 CONtROL AIR BOTTLE RACK
 
1/BI96 12:41 PM                        DONALD C. COOK NUCLEAR PLANT UNIT 2                      &#xb9;                                Pag8&#xb9;3 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN Equip      Train    Equipment LJ  Rev            Syaiemr Equipmenl Deeaip5on                  Buuding    Floor Bev      Room or Row Col No 0          12      2.TK.253.2    0      COHTROL A5T I PRESSURIZER TRNN                  COMTAINMEMT      012.N      LOWER CONT, QUAD REUEF, VALVENRV-153  'A'RESSVRE HO. 4 RESERVE COMTROL'IR BOTTLE RACK 12  ,,
2.TK 2533      0      CONTROL AIR I PRESSURIZER TRAOI                CONTANMENT      050.00    UPPER CONT, QUAD REUEF VLVNRV-152    R'RESSURE 4
EMERGENCY AIR BOTTLE RACK 12                              CONTROL AR I PRESSURIZER TRAN                  CQMTHNMENT      050.00    UPPER CONT, QUAD REUEF VLVNRV-153  'A'RESSURE EMERGENCY AIR BOTTLE RACK STARDHG AIR I 2AB QESEL GENERATOR                  AUXIUARY  ~
557.00      AB EMER DSL GEN lUBE '1RACK                                                            RM 2-774JGCD    ,0        STARlNG AIR I 2CD QESEL GENERATOR                  AUXLJARY      507.00      CD EMER DSL GEN 11JBE TRACK                                                            RM 0          ELECTRICAL QSTRIBUTIQN. 000VAC I              ~  AUXLJARY      587.00        587 HALLWAY
                                        ~ ~ NOVAC MOTOR COMTROL CENTER  A~
0          ELECTRICAL QSTTBBUTIOM, 000VAC I                AUXLJARY      587.00        587 HALLWAY NOVAC MOTOR CONTROL CENTER A847 12                          250VDC CONTROL AND NSTRUMENThllOH I                    AUXLIARY      587.00        507 HALLWAY CONTROL CENTER VALVE ELECIRICALQSTRIBUTION, 000VAC I                  AUXLIARY      557.00      AB EMER DSL GEN 2~          0 000VAC JJOTOR CONTROL CENTER ASOA EU~CAL QSIRIBUTIOH, 000VAC I                      AUXIUARY      587.00 RM ABEMERDSLGEN 2~          0 000VAC MOTOR CONTROL CENTER ASDJJ ELECTRICAL QSTRIBUllON, NOVAC I                  AUXLJARY    567.00 RM CD EMER DSL GEN 2~                  000VAC MOTOR CONTROL CENTER ABDC ELECTRICAL QSTRISVAOH, 000VACI NOVAC MOTOR CONTROL CENTER ABD4J AUXIUARY,    587.00 RM CD EMER DSL GEH RM 2~V%        0        ELECTRICAL QSTRIBUHON, 600VAC I                  AUXLJARY    587.00        587 HALLWAY 800VAC VALVECQMTROL CENTER ABYE 2~V47                  ELECTluCAL QSTRIBUAON, 000VAC I                  AUXLJARY    507.00        587 HALLWAY 2~          0 000VAC VALVECOMTROL CENTER ASV47 ELEClRICALQSTRIBUllOH, 000VAC I 800VAC MOTOR CONTROL CENTER Aha AUXLJARY    CLLOO          033 HALLWAY 2~                    ELECTRICAL DISTRIBUTION, 000VAC I NOVAC MOTOR CONlROL CENTER AM47 AVXIUARY    033.00        033 HALLWAY 2~%          0        ELECTRICAL QSTRIBUTlQH, 000VAC I                  AUXIUARY    009.00    "
009 HALLWAY 2~                  800VAC VALVECONTROL CENTER AZVW ELECTRICAL DISIRIBUTON, NOVACI 800VAC MOTOR CONTROL CENTER EZC.A AUXIUARY    01XOO          4KV RQQM MEZZANINEAREA 2~GS          0        ELECTRICAL QSTRIBUTIQN, NOVAC I                  AVIARY        013.00          4KV RQQM NOVAC MOTOR CONTROL CENTER EZC4J                                                MEzzANur8 AREA 2~DC        0          ELECTRICAL QSTRIBUTIQH, 000VAC I                AUXIUARY      013.00          4KV ROOM ~
000VAC MOTOR CONTROL CENTER EZCC                                                MEZZANWEAREA 2~GO                    ELECTIIIGAL QSTRIBVTIOH, 000VAC I                AUXIUARY      013.00          4KV RQQM 000VAC MOTOR COMTROL CENTER EZCO                                                MEZZANINEAREA ELECTRICAL QSTRIBUTION. 600VAC I              SCREENHOVSE      594.00      TRAVELSCRN MCC NOVAC MOTOR CONTROL CENTER PSA                                                    UPPER RM ELECTRICAL QSTRIBUTION, 600VAC I              SCREENHOUSE      594.00      1RAVEL SCRN MCC 800VAC MOTOR CONTROL CEMTER PS47                                                  UPPER RM 2-21 A        ~
ELECTRICAL QSTRIBVBQH. 000VAC I 600V                AUXIUARY      009.00    4KV RM NOV SWGR BUS 21 A SWITCHG EAR                                                      AREA 2.21A1                ELECTRCAL QSTRIBVTeN, 000VAC I                  AUXIUARY      N9.00    4KV RM - NOV SWGR REACTOR ROD CONTROL SOUTH MOTOR                                                      AREA GENERATOR SET CRDMG-2S SUPPl.Y BREAKER 2-21A10            ELECTRICAL QSlRI BUllON, 000VAC I WEST                              009.00  4KV RM NOV SWGR TVRBNE AUXLJARYCOOUNG WATER                                                        AREA PUMP PP 14W SUPPLY SREAKER 2-21 A11    0        ELECTRICAL QSTRIBVllON, 000VAC I                  AUXLJARY      009.00  4KV RM 000V SWGR 80OVAC BUS 21A SUPPLY BREAKER                                                    AREA 2.21hZ                ELECTRICAL QSTRIBUllOH, 000VAC I                  AUXLJARY    009.00    4KV RM 6OOV SWGR 000VAC MCC AMASUPPLY BREAKER                                                      AREA 2-21 A4    0        ELECTRICAL DISTRIBUllON.600VAC I                  AUXIUARY    009.00    4KV RM 000V SWGR SOUTH PLANT UGHTIMG TRANSFORMER TR.                                                      AREA LTG4S SUPPLY BREAKER 2.21AS      0        ELECTRCAL QSIRIBUTIQH, NOVAC I                    AUXIUARY    009.00    4KV RM NOV SWGR NOVAC MCC ASIASUPPLY SREAKER
                                                            ~
AREA 2-21A0      0        ELECTRICAL DISTRIBUTION. 000VAC I                AUXIUARY    009.00    4KV RM 000V SWGR NOVAC MCCS          P&h, TPP~ AND                                                  AREA VCCS ABV.A AZVASUPPLY BREAKER 2.21A8      0        ELECTRICAL QSTRIBVTIOH, 000VAC I                  AUXLJARY    CXI.OO    4KV RM 600V SWGR NOVAC BORIC AGO HEAT TRACE CONIROL                                                      AREA CENTER BHT.A SUPPLY BREAKER 2-21A9      0        ELECIRICALQSTRIBUTIQN, 0OOVACI                    AUXIUARY    009.00    4KV RM NOV SWGR 000VAC MCC EZC.A SUPPLY BREAKER                                                    AREA 2-21 AC      0    ELECTRICAL QSTRISUTIOH. 0OOVAC I OOOV                AUXLJARY    009.00    4KV RM 000V SWGR BUS 21 A TQ 0OOV BUS 21C TIE BREAKER                                                AREA 2.21 8    0      ELECTRICAL QSTRIBUTON, 600VAC I 600V                  AVXIUARY    N9.00    4KV RM NOV SWGR BUS 21 8 SWITCHGEAR                                                        AREA 2.21 81                ELECIRICALDISTRIBUTKJH, NOVAC I                  AUXIUARY    N9.00    4KV RM NOV SWGR 000VAC MCC ABD4J SUPPLY BREAKER IZ                                                    AREA EL 2-21 810    0    ELECTRICAL QSTRIBVROH. 000VAC I PLANT                  AU@VARY      N9.00    4KV RM NOV SWGR AR COMPRESSOR OMEP1 SUPPLY                                                      AREA BREAKER 2.21 811    0          ELECIRICALQSTRIBVAQH. 000VAC I                  AUXLIARY      009.N    4KV RM NOV SWGR 80OVAC BUS 218 SUPPLY BREAKER                                                    AREA 2.21 812    0          ELECTRICAL QSTRIBUOOH, 0OOVAC I                  AUXIUARY      009.00    4KV RM ~ 000V SWGR SDUIH NONESSENTIAL SERVICE WATER                                                      AREA PUMP PCS SUPPLY BREAKER
 
1N$ 612:41 PM                      DONALDC. COOK NUCLEAR PLANT UNIT 2                &#xb9;                              Page&#xb9;4 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN Equip, Qssa Train  Equipment ID                System/ Equipment Descripten          Buildiny  FKer Eiev    Room or Row Cof 2          1      2.2t 813              ELECTRICAL DISBTIBUAON, 000VAC I          AUXIUARY    009.00  4KV RM 000V SWGR
                                      'VRBWE ROOM NOUCTlDN HEATIHG,                                              AREA STRESS REUEF AHD BOLT HEATERS SUPPLY BREAKER 2-21 82              ELECTRICALQSAtNNITION, 000VAC          I  AVXLfARY  ~  CXI.QO  4KV RM 000V SWGR CSVAC MCC EZC8 SUPPLY BREAKER                                          AREA 0    ELECTRICAL DISTRSUAON, 000VACI QQQV          AVXIUARY    009.00  4KV RM 000V SWGR 2-21 85 BUS 21 8 SPARE CRCUIT BREAKER ELECTRICALDSTRIBIBION, 0QQVAC 000V MOTOR CONTROL CENTERS TBG4TW AND I    ~Y          009.00 AREA 4KV RM 000V SWGR AREA TBPJNt SUPPLY BREAKER 2-21 86    0    ELECBQCAL QSBtIBUAQN, 600VAC I EAST            AUXNJARY    009.00  4KV RM 600V SWGR TVRSNE AUXNJARYCDDUNG WATER                                            AREA PUMP PP.1 4E SUPPLY BREAKER
                                    ~
ELEC iRICALQSAtIBVIIQN,000VAC I 000V          AUXNJARY    009.00  4KV RM 000V SWGR BVS 21 8 TO 600V BUS 21 D TIE BREAKER                                    AREA 221 C          ELECTRICALDSIRIBUAQH, 000VAC I 000V          AUXUARY      009.00  4KV RM 000V SWGR BVS 21 C SWITCHG EAR                                          AREA ELECBTICALQSTRIBUAON, 000VAC 00QV        I    AVXNJARY    009.00  4KV RM 000V SWGR BUS 21C SUPPLY BREAKER                                          AREA ELECTRICAL DSTRIBUTION. 000VAC I 241C10 000VAC MCC ABDC AND BREAKER 2~ SUPPLY AUXLIARY    009.00  4KV RM 000V SWGR AREA 241CI1      0    ELECTRICAL DSBtIBUAON, 000VAC I QQQV          AUXNJARY    009.00  4KV RM 000V SWGR BUS 21 C SPARE CIRCUIT BREAKER                                        AREA 2-21 C12    0        ELECTRICALQSTRIBUAON, CmVAC            I  AUXIUARY    C9.00    4KV RM 000V SWGR SOUTH SPENT FUEL PIT PUMP 124sP418                                        AREA SUPPLY BREAKER 2-21 C13    0        ELECTRICALDSBQBUAON, 000VAC            I  AUXNJARY    609.00  4KV RM ~ 000V SWGR RECPRDCATIHG CHARGNJG PUMP PPM                                            AREA SUPPLY BREAKER 241C14    0      ELECBQCAL DSTRIBUAON, 600VAC I FIRE          AUXIUARY    009.00  4KV RM 000V SWGR PROTECAON WATER INGH DEMAND PUMP                                            AREA
                                                . Pp-t SUPPLY SREAKER t
2-21C1 0  0        ELECBtICALDSTRIBUAON, 600VAC I            AUXNJARY    009.00  4KV RM 600V SWGR 000VAC MOTOR CDMTROL CENTER TBCCN                                          AREA SUPPI.Y BREAKER 2-21CI 7            ELEtrBIICALDISlRISUADN 600VAC I            AUXIUARY    009.00  4KV RM 000V SWGR NORlH NONEJISEMBAL SERVICE WATER                                          AREA PUMP PPAN SUPPLY BREAKER 241C16            ELECTIQCALDISTRIBUAON, 0XNAC I Mhuf            AUXIUARY    009.00  4KV RM 60QV SWGR lURSNE AVJQUARYLUBE DL PUMP OT-201                                            AREA SUPPLY BREAKER 2-21 C2    0      CONTANMENTPOLAR CR I ELECIRICAL              AUXIUARY    609.00  AIR COOLED CRCUIT BREAKER IMETAL QSTRIBUT'LECBQCAL                                      FRAM 2.21C3                            DSBtIBUAON, 600VAC I 600V    AUXNJARY    009.00  4KV RM 6QQV SWGR BUS 21C SPARE CutCUIT BREAKER                                          AREA 2.21C4    0          ELECTRICAL DSTRIBUAON 000VAC I            AUXLJARY    009.00  4KV RM 600V SWGR CRCULATIHG WATER TRAVEUNG SCREEN                                            AREA SDVIHWASH PUMP PP 15S SUPPLY BREAKER 2    . 2-21C6              ELECTRCAL QSTRIBUAON, 000VAC I            AUXLlARY    009.00,  4KV RM 000V SWGR 0QQVAC MCC EZCC SUPPLY BREAKER                                          AREA ELECTRICAL QSTRIBVAON, 600VAC I 600V          AUXLIARY    009.00    4KV RM CD 4KV BUS 21 C SPARE CIRCUIT BREAKER                                      SWGR AREA 2-21C5    0  ELECAQCALDSTRIBUAON, 0XWAC I PLANT              AUXLJARY    009.00  4KV RM MOV SWGR AND CHTMTSTANDBY UGHTlNG                                            AREA TRANSFORMER TR4.TGS SUPPLY BREAKER 2<1 C9          ELEC fRICAL DSTRIBVAON, 000VAC I MAIN          AVXIUARY    609.00  4KV RM 000V SWGR ANO SPARE TfthNSFORMER AUXIUARIES                                          AREA NORMALDSBTNTUAON CAINNETTCSN SUPPLY BREAKER 2-21D          ELECBQCAL QSTRIBVAON, 00QVAC I 600V            AVXIUARY    609.00  4KV RM 600V SWGR BUS 210 SWfTCHGEAR                                            AREA 2-21D1    0    ELECAtICALQSTRIBVTIOM, 000VAC I QQQV          AUXNJARY    609.00  4KV RM 000V SWGR BUS 210 SUPPLY BREAKER                                            AREA 2-21D10    0        ELEGTRlcAL DsTRIBUAQrL 000vhc I            AUXIUARY    609.00  4KV RM 6QQV SWGR NOfAH PLANTUGHANG TRANSFORMER                                            AREA TR4.TG4N SUPPLY BREAKER 2-21D11    0    ELECAQCALDSTRIBVAON,000VACI6QQV                AUXLJARY    009.00  4KV RM 000V SWGR BORC ACO HEAT TRACE CONTROL                                            AREA CEMlER BHT4J SUPPLY BREAKER 2-21D13    0        ELECTRCAL QSTRI BUTIOH, 000VAC I          AUXLIARY    009.00  4KV RM 000V SWGR REACTOR ROD CDMTROL NORTH MOTOR.                                            AREA GENERATOR SET CRDMG-2N SUPPLY BREAKER 241 D14    0    000VAC IXSBQBUAONI 600VAC MCC 2.AB.            AUXIUARY    609.00  4KV RM ~ 0QQV SWGR D, VCC 24BV4J, MCC 24sSD SUPPLY                                        AREA BREAKER 2.21D3              ELECTRICAI. DISTRIBUTION, 000VAC I        AUXIUARY    609.00  4KV RM 000V SWGR CONTANIMEMTUG HANG TRANSFORMER                                            AREA TR4.TG.1 0 SUPPLY BREAKER 2-21D4          ELECBQCAL DSTRI BVAON. 600VAC I 000V          AVXIUARY    009.00  4KV RM 0QQV SWGR BUS 210 SPARE CIRCUIT BREAKER                                          AREA ELECAIICALDSTRNJ UAON. 000VAC I            AUXNJARY    009.00  4KV RM 0QQV SWGR 600VAC MCC ABD4J SUPPLY BREAKER                                          AREA 0        ELECfRICALQSIRIBUTION. 600VAC I            AUXLJARY    009.00  4KV RM 000V SWGR 000VAC MCC EZCJJ SUPPLY BREAKER                                          AREA
 
1N/96 12:41 PM                      DONALDC, COOK NUCLEAR PLANT UNIT 8 2                                                  Pagef5 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN Equip      Train Equipmant IO  Rav                                                                                Room or Row Col Ho 2          2      2.21 DO              ELECBIICALQSBBBUBQN, MOVACI                      AUXIUARY    609.00  4KVRM MOVSWGR MOVAC MCC AMO SUPPLY BREAKER                                                  AREA 2          2      241 D9          ELECTRICALQSTRIBlfllQH, OOOVAC MANt I                AUXIUARY    609.00  4KV RM - MOV SWGR AND SPARE TftWSFOftMER AVXLIARIES                                                AREA EMERGENCY QSBUBIlBQN CAINNETTCSE SUPPLY SREAKER 242$ YA          REACTOR TRIP BREAKER (ROO CONTROL 6                  AUXIUARY  M9.00 NISTJ I REACTOR ROD CONTROL TRW REACIQR TRIP BYPASS CIRCUIT BREAKER 0    REACTOR TIOP BREAKER IRQO CONTROL 4                  AVXLIARY  609.00 NIST.) I REACTOR RQO CQNTROI. TRAN 8 REACTOR TRIP BYPASS CIRCUIT BREAKER 2424tTA            RQO CONlRQL ANO NISBtUMENTATIQN'I                  AUXLIARY  609.00      CRD EQINP RM REACTOR ROO CONTROL TRANt TRIP CNtCVITBREAKER
                                                                          'A'EACfOR 0      RQO CQHIRD. ANO INSBtUMENTATIQN              I    AVXNJARY    609.00 REACTOR ROD CONTROL TRAN 7F REACTOR TRIP CNTCUIT BREAKER 2-721 A          4I$ ELECBIICALDSBIIBUBQNI 41$ BUS                  AUXNJARY    609.00      4KVRM A841$
72t A SWITCHG EAR                                                SWGR AREA 2.721 h1    0        ELECBNCAL QSIRIBVTIQH, 41MVACI                  AUXNJARY    609.00      4KVRM    A84I$
                                      'SOUlH SAFElY NIJECBQN PUMP PP-26S                                              SWGR AREA SUPPLY BREAKER 2 721A10          ELECBtICALQSTRIBtfllQN. 4160VAC I MOV                AVXLLARY    M9.00      4KVRM    A84I$
BUS 2f A SUPPLY 7RANSFOitMER TR2f A                                          SWGR AREA SUPPI.Y BREAKER 2-121A11    0    ELECBNCALQSTRIBUTIQH, 41MVACI AB                                            4ISRM A84KV EMERGENCY IXESEL GENERATOR TO 4I$                                              SWGR AREA BUS 721A SUPPLY BREAKER 2-721 A1 2          ELECTRICAL QSTRIBUBON, 4160VAC I                  AUXIUARY    609.00      4ISRM A84KV CNtCtNT BREAKER FROM 69KV TO BUS 721 A                                          SWGR AREA 6          1      2.T21A2            ELECBNCAL DSTRIBVllQN, 41 60VAC I                AUXIUARY    M9.00      4KVRM A84KV WEST MOTCR DRIVEN AUXFEEDWATER                                                SWGR AREA PUMP PP4W SUPPLY BREAKER 2.T21A3            ELECfRCALQSTRIBUTIQN ~ 4160 VAC I                  AUXIUARY    609.00    4KVRM A84KV WEST CONTANIMENTSPRAY PUMP PP4W                                                SWGR AREA SUPPLY BREAKER 2-l21A4    0        ELECBIICALQSIRIBVBOH, 4160VAC I                  AUXIUARY    OIS.OO    4KVRM A84I$
WEST RESGUAL HEAT REMOVALPUMP PP-                                              SWGR AREA 65W SUPPLY BREAKER 2.721 AS            ELECBNCALDSTRIBVBQH, 4160VAC I                    AUXIUARY              4KV RM AB 4KV WEST ESSENBAL SERVCE WATER PUMP                                                SWGR AREA PP TW SUPPLY BREAKER 2.721 AO        ELECTRICAL QSlRIBUTIQN, 4160 VACI 4KV                AVXIUARY  609.00      4KVRM A841$
BUS 72tA 70 460V PRESSURIZER HEATER                                            SWGR AREA BUS SUPPLY TRANSFORMER SUPPLY BREAKER
                                                                        ~t      PHA 2.12fAT    0        ELECBNCAL QSBtietfllON, 4160VAC I 0:
AUXLIARY  609.00      4KVRM A84KV WEST COMPONENT COOUNG WATER                                                SWGR AREA PUMP PP-1 OW SUPPt.Y BREAKER ELECTRICALDSTRIBVBQN, 4160VAC I                    AVXNJARY  609.00      4KVRM    A84I$
WEST CENBBFVGALCHARGING PUMP PP.                                                SWGR AREA 60W SUPPI.Y BREAKER 2.721 A9          ELECBTICALDSBatlON11MVACI4KV                        AUXIUARY  M9.00      41$ RM A84KV BUS 2A TO BUS 121 A 7IE BREAKER              P SWGR AREA 2-721 8    0                                    I 4I$ ELECTRICAL DSTRIBUTIQN 4KV BUS                  AUXLIARY    609.00      4KVRM A84KV 72t h SWBCHG EAR                                                  SWGR AREA 2 721 81    0    ELECIRICALDSTRIBUTIQN,4160VAC/4KV                    AUXNJARY    609.00      CV RM - AB 41$
BUS 28 70 4KV BUS 721 8 llE BREAKER                                          SWGR AREA 2.121 82            ELECBOCAL QSTRIBVBQH, 41MVACI                    AVXIUARY    609.00      4KVRM A84KV CRCINT BREAKER FROM 69KV BUS TO BVS                                            SWGR AREA 721 8 2.T2184    0      ELECBtiCALQSTRIBVBOH. 4160VAC I AB                  AVXIUARY    609.00      4KVRM A84KV EMERGENCY QESEL GENERATOR TO 4KV                                              SWGR AREA BUS 721 8 SUPPLY BREAKER 2.721  0  0    4KV ELECBtICALDSTRIBUTIQH I 4KV BUS                  AUXIUARY  M9.00      4KVRM CD4KV 72f C SWIfCHGEAR                                                SWGR AREA 2.721 C1          ELECTRICALDSTRIBVBOH, 4160VAC I 1KV                  AUXIUARY  609.00      4KVRM CD4I$
BUS 2C TO 4KV BUS 721 C 7lE BREAKER                                          SWGR AREA 2.721 C2    0        ELECB6CAL QSTRIBVBQH, 41MVAC                I    AUXNJARY  609.00    4KVRM MOVSWGR CRCUIT BREAKER 4I$ FROM 69KV TO                                                  AREA BUS 721 C 2-721 CO          ELECIRICALDISTRIBtflIQN,4160VAC I CO                AUXNJARY              4KVRM    C04I$
EMERGENCY DESEL GENERATOR TO 4KV                                              SWGR AREA fmS 72I C SUPPLY BREAKER 2-7210          4KV ELECIRICALDSTRIBUTIQN I 4KV BUS                  AUXIUARY  609.00      4KV RM    CD 4KV 721 0 SWITCHG EAR                                                SWGR  AREA 2.721 D1    0    ELECTRICAL DSTRISVllQN, 4160VAC I 4KV                AUI0UARY  609.00      4KV RM    CO 4KV EMERGENCY POWER BUS EP TO 41$ BUS                                              SWGR  AREA 721 0 SUPPLY BREAKER 2.T21D1 0        ELECTRICAL QSfRIBVBQN. 4160VAC I EAST                AVXIUARY  609.00      4KVRM CD4KV ESSEHIIAL SERVICE WATER PUMP PP-TE                                            SWGR AREA SUPPLY BREAKER 2 721011    0    ELECIRICALDSTRIBUBON,4160VACI EAST                    AVXIUARY  609.00      4KVRM    C04I$
MOTOR DRIVEN AVXLIARYFEEDWATER                                                SWGR AREA PUMP PP4E SUPPLY BREAKER 2-721 012        ELECBIICALDSTRIBVTIOH, 41MVACI 1KV                    AUXNJARY  609.00      4KVRM C04KV BUS20704KV BUS72107IE SREAKER                                                SWGR AREA
 
1/886 1241 PM                      DONALD C. COOK NUCLEAR PLANT UNIT 2          &#xb9;                                  Page      &#xb9;6
                                                            ~
SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN Equipment IO  Rev            System  l          Oesonpbon        Budohn9  Floor Eiev      Room or Row Col No 2-12102    0    ELECTRCAL QSTRIBUTKW, 4100VAC I 000V      AUXIUARY    N9.00        4KVRM CO4KV BUS 21D SUPPLY TITWSFORMER TR210                                      SWGR AREA SUPPLY BREAKER Z.TZIDS    0    ELECTRICAL QSTRIBUllON, 4100VAC I EAST    AUXIUARY    N9.00        4KVRM.CO4KV COMPONENT COOUNG WATER PUMP PP-                                        SWGR AREA 16E SUPPLY BREAKER 2.12104            ELECTRICAL QSTRIBVDQH, 41N VAC I EAST'OHTAWMENTSPRAY PUMP PP4E AUXIUARY    009.00  'KV      RM CO4KV SWGR AREA SUPPLY BREAKER ELECTRICAL QSTRIBUTION PANEL, 4100      Atfl0LIARY  009.00        4KV RM CO 4CV VAC I NOR1H SAFETY WJECTIQH PUMP PP-                                    SWGR AREA 28N SUPPLY BREAKER ELEC1R ICAL QSITIIBUTIQIL4100VAC I EAST  AVXIUARY      N9.00      4KV RM N0V SWGR RHR PUMP PP45E SUPPLY BREAKER                                          AREA Z-T?107    0    ELECIRICALQSIT(IBVTIQN,4100VACI EAST      AUXIUARY      009.00        4KV RM CO 4KV CENTRIFUGAL CHARGWG PUMP PP40E                                        SWGR AREA SUPPLY BREAKER 0    ELIKTRCALQSTRIBVDON, 41NVAC I CO        AUXIUARY      N9.00        4KV RM CO 4KV EMERGENCY QESEL GENERATOR TD 4CV                                        SWGR AREA BUS 121 D SUPPLY BREAKER 2.121 D9    0    ELECfRICALQSTRIBUllON, 4100 VAC I 4CV    AUIGUARY      009.00        4CV RM CD 4KV BUS 1210 TO 4KIVPRESSUIBZER HEATER                                      SWGR AREA BUS SUPPLYTTTANSFOITMER TR21PHC SUPPLY BREAKER 0    120V CONTROL ROOM WSTRUMENTATTON        AUXIUARY      009.00    4KV RM NOV SWGR QSTRIBUIlON/16KVATITANSFORMER-                                          AREA CONSTANT VOLTAGE 242(IO4ICVT    0    ~120VAC QSTT(SVTION I 120V AC CR WST      AUXIUARY      009.00    4KV RM 000V SWGR QBTR cHa IsoL coNT YQLT                                            AREA TRANSFORMER 242(ID45CVT    0    120V CONTROL ROOM WSTRUMENTATION        AUXIUARY      009.00    4KV RM 000V SWGR QSTR I 10KVA ISOUMffER - CONSTANT                                        AREA VOLTAGE TRANSFORMER 242TIO4V~      0    120V CONTROL ROOM WSTRUMEHTATIQN        AUXIUARY      009.00    4KV RM 000V SWGR QSIR I 10KVA ISOUMITER CONSTANT                                          AREA VOLTAGE TRANSFORMER 24XTA&FFCKT    0        QESEL GENERATKIL CONTROL ANO          AUXIUARY      587.00      ABEMERDSLGEN WSTRVMENTATTONI AB EMERGENCY                                            RM IXESEL GENERATOR OME.15GAB FIELD RASH CRCUIT TRANSFORMER 0        QESEL GENERAllQN, CONTROL ANO        AUXIUARY    587.00      COEMERDSLGEN I
WSTRVMENTATION CD EMERGENCY                                              RM DIESEL GENERATOR OME-1 5GCO FIELD FlASH CKT TRANSFORMER 0    120VI220 CONIRQt. ANO WSTRUMENTATION      AUXIUARY    587.00      CO EMER OSL GEN I AUXUARYFEEDWATER 12N208VAC                                              RM QSTRIBUIKNPANEL AFW SUPPLY TRANSFORMER 0    120VIKO CONTROL ANO WSIRUMENTATTQN        AUXIUARY    587.00      AB EMER OSL GEN I 120I208VAC EMERGENCY LOCAL                                            RM SHUTDOWN QSTRIBUTION TRANSFORMER 2.1821 A          ELECTRICAL QSTRIBUllQH, NGVAC I 000V      AUXIUARY    N9.00      4KV RM 000V SWGR BUS 21A SUPPLY TRANSFORMER                                          AREA 2 1R21 B        ELECTRICAL QSTI (IBUITON, N0VAC I 000V    AUXIUARY    609.00    4KV RM NOV SWGR BUS 21 B SUPPLY TRANSFORMER                                          AREA 2 TR21C          ELECTRICAL QSIRIBUIION, 000VAC I 600V      AUXIUARY    009.00        4KV RM CD 4KV BUS 21 C SUPPLY TRANSFORMER                                        SWGR AREA 2.TR21  0    0    ELECITtlCALQSTRIBUITQH, 000VACI 000V      AUXIUARY      009.00    4KV RM 000V SWGR BUS 21 D SUPPLY TRANSFORMER                                          AREA 12    12~%1 S      0        SPENT FUEL PIT COQUNGICLEANUP I      U42 AUIGIJARY  009.00        SPENT FUEL SOUTH SPENT FUEL PIT PUMP Pfl'EAT XCHGR RM 2~-1 OE    0        COMPONENT COQUNG WATER I EAST        AUXIUARY      N9.00          009 HALLWAY COMPONENT COOLING WATER PUMP
                                                      ~
2~-10W      0        COMPONENT CQOUNG WATER I WEST          AUXIUARY      009.00          009 HALLWAY COMPONENT COOLING WATER PUMP 24%.26N                SAF ETY WJECTION I NORTH SAFEIY      AUXkJARY    587.00        NSAFElYWJPMP JECTIQN PUMP                                                RM 2~.26S      0          SAFElY              I SOUTH SAFETY  AUXIUARY    587.00        S SAFEIY WJ PMP WJECTION PUMP                                                RM 2~~        0      AUXLIARYFEEOWATER I EAST MOTOR DRIVEN AtflOUARYFEEOWAlER PUMP TURBWE      591.00        E MTR ORIV AUX FEEOWIR PMP 2~~        0      AUXSJARY FEEOWATER I WEST MOTOR DRIVEN Atfl0UARYFEEOWATER PUMP TURBINE    591.00      W MTR DRIVEN AUX FDWTR PMP 12                0    AUXuARYFEEOWATER I TURBWE DRIVEN          TURBINE    591.00        TB DRIVEN AUX AUXIUARYFEED PUMP                                            FDWTR PMP 0        BORON MAKEUP (CVCS) I BORIC ACK)      htflGLIARY  587.00        BORIC ACID STOR sToRAGE TANKs TRANsFER pUMp sr8 2~~                  BORON MAKEUP (CVCS) I BORIC ACID sTQRAGE TANKsTRANsFER pUMp 44 AUXNJJWY    587.00 TANIC AREA BORIC AGO STOR TANKAREA 12    Z~M        0                            I CHARGWG (CVCSI REQPRQCATlNG          htflQUARY    587.00        RECIPRQCATWG CHARGING PUMP                                          CHARG PMP RM
                  . 2~40E        0      CHARGWG (CVCS) I EAST CENTRIFUGAL        AVXIUARY    587.00        E CENTRIFUGAL
~
CHARGWG PUMP                                          CHARG PMP ROOM
  )  5              24%40W      0    CHARGWG (CVCSI I WEST CENTRIFUGAL        AUXI/ARY    587.00        W CENTRIFUGAL CHARGWG PUMP                                            CHARG PMP RM CONTRCL ROOM AIR CQNQTTQNWG CHILL        AUXIUARY    650.00      CTRL RMAIRCONOIT WATER I COHlROL ROOM AIR                                            RM CONOmQt4NG NORTH CHILLWATER, C6ICU(ATION PUMP
 
1/8/96 12:C PM                    DONALD C. COOK NUCLEAR PLANT UNIT 2        &#xb9;                              Page&#xb9;7 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR SEISMIC WALKDOWN Equip      Train                                                              BurIINn9 Floor Bev    Room or Row Col 0    COMIROL, ROOM ANT CONDfDQtNNG CHLL      AUXNJARY    850.00  CTRL RM AIR COMDT I
WATER CONTROL ROOM AIR                                          RM CONQBOtNMG SOUTH CHNL WATER CRCUIhTION PUMP 24T 105481    0  DESEL FUEL QL I AB EMERGENCY QESEL      AVXLIARY    587.00  AB EMER DSL FUEL FUEL CIL TRANSFER PUMP &#xb9;1                                OL XFER PMP 247 1lXM82    0  QESELFUELOLIABEMERGENCYQESEL            AUXNJARY    587.00  AB EMER DSL FUEL FUEL OL TTTANSFER PUMP &#xb9;2                                OII. XFER PMP 24T 105CO1    0  DESEL FUEL OL I CO EMERGENCY DESEL      AVXNJARY    587.00  COEMEROSLFVEL FUEL OL TRANSFER PUMP &#xb9;1                                  OIL XFER PMP 24T 105CD2    0  QESEL FUEL OLI CD EMERGENCY QESEL      AUXNJARY    587.00  CO EMER OSL FUEL FUEL OL1$ IANSFER PUMP &#xb9;2                                OIL XFER PMP 24T.111~      0  DESEL LUGE OL I AB EMERGENCY DIESEL    AUXNJARY    579.00  AB EMER DSL LUBE LUBE ON. BEFORE ANO AFTER PUMP                                    OL PIT 24T 11140  ~ 0    QESEL LUBE OL I CO EMERGENCY QESEL      AVXIUARY    579.00  COEMEROSLLVBE LUBE OL BEFORE ANO AFTER PUMP                                      OIL PIT 24T 1174B    0    QESEL LUBE CL I AB EMERGENCY QESEL      AVXNJARY    579.00  AB EMER OSL LUBE LUBE OIL HEATER OT.115AB PUMP                                    OIL PIT 24T T1 TED  0                      I QESEL LUBE OL CD EMERGENCY QESEL        AUXNJARY    579.00  CO EMER OSL LUBE LUBE OIL HEATER OT.115CD PUMP                                    OIL 24T 119kB        QEsa.LUBE DLIAB EMERGENCY QESEL                      579.00  AB EMER DSL LUBE Prl'VXNJARY BYPASS LUBE CIL FL1ER OT 115AB PUMP                                  ON. PIT 24T 119CO        DIESEL LUBE QL I CD EMERGENCY QESEL    AVXNJARY    579.00  CD EMER DSI. LUBE BYPASS LUBE OL FLTER QT 115CD PUMP                                    OIL PIT 24T 130481                                I QESEL JACKET WATER AB EMERGENCY        AUXNJARY    587.00  AB EMER DSL GEN QESEL JACKET WATER PUMP &#xb9;1                                        RM 24T 130482        QESEL JACKET WATER I AB EMERGENCY      AUXIUARY    587.00  ABEMERDSLGEN DESEL JACKET WATER PUMP &#xb9;2                                        RM 247.130401    0    QESELJACKETWATERICOEMERGENCY            AUXIUARY    587.00  CDEMERDSLGEN DIESEL JACKET WATER PUMP 1                                      RM 247  130CO2        QESEL JACKET WATER I CO EMERGENCY      AVXIUARY    587.00    CO EMER DSL GEM DESEL JACKET WATER PUMP 2                                        RM 24T 13548          DIESEL JACKET WhlERI AB EMERGENCY      AUXIUARY    587.00  ABEMEROSLGEN DIESEL AUXLIARYJACKET WATER PUMP                                      RM 24T 135CO    0    QESEL JACKET WATER I CO EMERGENCY      AUXLIARY,  587.00    CO EMER DSL GEN QESEL AUXNJARYJACKET WATER PUMP                                        RM 0        RESOUAL HEAT REMOVALI EAST        AVXNJARY    573.00  EAST RHR PUMP RM RESOUAL HEAT REMOVALPUMP 2~45W      0        RESDVAL HEAT REMOVALI WEST          AUXIUARY    573 00    W RHR PMP RM RESOUAL HEAT REMOVALPUMP 2~ 7E      0      ESSENllhL SERVICE WATER I EAST    SCREENHQUSE  591.00  E ESSNTL SERV WIR ESSEMIIAL SERVICE WATER PUMP                                    PMP RM 2~.7W      0      ESSENTIAL SERVICE WATER I WEST    SCREENHQUSE  591.00    W ESSNlL SERV ESSEMllhL SERVICE WATER PUMP                                WTR PMP RM 2~~                    CQMTANIMEMTSPRAY I EAST COMTAIMMEMTSPRAY PUMP AVXIUARY    573.00  E CONT SPRAY PMP RM 0          COMTANIMEMTSPRAY I WEST          AUXNJARY    573.00  W CONT SPRAY PMP CONTAINMEMTSPRAY PUMP                                          RM 24RV%10      0            OEMINERALI7EO MAKEUPI          AUXIUARY    850.00
                                                ~
24RV&11      0                                            AVXIUARY    850 00 24CR 401    0  NUCLEARSAMPUNG I STEAM GENERATOR        AVXIUARY    591.00        VESllBULE
                                        &#xb9;1 BLOWDChM SAMPLE DSR401 COMTA&#xb9;rMENT ISDhTIOM VALVE 0    NUCLEAR              I SlEAM GENERATOR  AUXLIARY    591.00        VESTIBULE
                                        &#xb9;2 BLOWDGVMSAMPLE DSR402 CONTAINMENTISCkhllQN VALVE 0
                                        &#xb9;3 BL~
NUClEAR SAMPUNG I STEAM GENERATOR SAMPLE OSR403 CONTAIMMENTISOlhllOM VALVE AUXNJARY    591.00        VESllBULE 0    NUCLEARSAMPUNG I STEAM GENERATOR        AUXIUARY    591.00        VESTIBULE
                                        &#xb9;4 BLOW004W SAMPLE DSR404 CQMTNNMENTISrXhlXON VALVE 24CRQ10          SLOWDOWN I STEAM GENERATOR OMEG.1        AUXNJARY    591.00        STARTUP BLOWOOVW CONTAINMEMTISOLATION                                  SLOWDOWN VALVE                                        FLASHTAMKRM BL~
BLQWOOWN I STEAM GENERATOR OMM-2 COMTANIMEMTISOIATIOM VALVE AVXIUARY    591.00        STARlUP SLOWDOWN FLASHTAMKRM 0
BL~
BLQWQOWN I STEAM GENERATOR OME~
COMTNNMEMTISOLhllOM VALVE AUXIUARY    591.00        STAR TUP BLOWDOWN FLASHTAMKRM 0
BL~
BLOWOQWNISTEAM GENERATOR OME~
CQMTAINMEMTISOLATION VALVE AUXIUARY    591.00        STARlVP BLOWDOWN FthSHTANK R M 12    24RV~7    0    STEAM UNE DRAINS I MANISIEAM LEADS      AUXNJARY    500.00  MN STM UNES VERT COMOENSATIOM DRANITANKTK 150                                  PIPE CHASE OUTLET SHUTOFF VALVE 2~V.245    0      AUXIUARYFEEOWATER I WEST MOTOR          TURBINE    591.00  W MlR DRIVEN AUX DRIVEN AVXNJARYFEED PUMP PP4W 2 In                                FOWTR PMP AIR OPERATED TEST VALVE 2+RV.247  0      AUXILIARYFEEDWATER I WEST MOTOR        TURBINE    591.00  W MTR DRIVEN AUX DRIVEN AUXNJARYFEED PUMP PP4W                                  FDWIR PMP EMERGENCY 1 in AIR OPERATED LEAKOFF GLOBE VALVE 2+RV 255  0      AUXNJARYFEEOWATER I EAST MOTOR        TURBINE    591.00      E MTR ORIV AVX DRIVEN AUXIUARYFEEOWATER PUMP PP.                              FEEDWIR PMP 3E 2 In AIR OPERATED TEST VALVE 12    2+RV.258        AUXIUARYFEEOWATER I TVRBNr8 DRIVEN      TURBINE    591.00      TB DRIVEN AUX AUXNJARYFEED PUMP PPR 2 In AIR                                FDWTR PMP OPERATEO lEST VALVE
 
1/88612:41 PM                          DONALD C. COOK NUCLEAR PLANT UNIT 2              &#xb9;                                Pdgd&#xb9;8 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN Equip      Train  qtuipment IO                  System  I Equipment Desortpbon        Btnkling Fker Bev      Room or Row Col 2~V.257        0      AUXIUARYFEEDWATER I EAST MOTOR              TURBWE      591.00      E MTR DRIV AUX DRIVEN AUXIUARYFEEDWATER PUMP PP-                                      FEEDWIR PMP SE EMERGENCY 1 In HR OPERATED LEAKOFF VALVE 12      247(V@58      0    AUXUARYFEEDWATER I TURBWE DRIVEN              TURBWE      591.00      TB DRIVEN AVX AVXIUARYFEED PUMP EMERGENCY 1 ln                                        FDWIR PMP HR OPERATED LEAKOFF GLOBE VALVE 12      2~4$ 4          0      NAROGEN (REACTOR PLANI'ERVICE)      I    AUXIUARY    591.00          STARTUP NITROGEN SUPPLY To ACCUMULATOR                                        SLOWDOWN TANKS COMTAWMENfISOLATIONVALVE                                        FLASHTAMKRM 12      2&RV441        0        MAROGEN (REACTOR PLANT SERVICEI I        CONTAWhtENT    59(LOO    ANNULUS. QUAD No.
MAROGEN SUPPLY TO ACCUMULATOR                                              2 TAMKKSVENT VALVE 12  24IV4GR JJO  1  0          AUXIUARYBVILDiNGVEMALAllONI              AVXIUARY    809.00    4KV RM ~ 800V SWGR CONTROL ROD DRIVE EQ(NPMENT ROOM                                          AREA AND INVERTER AREA VENALATKIN RECIRCULAlWG AIR WLET DAMPER 12  24tV4GR440.2      0          AVIQUARYBUQXNG VEMIlLATIONI              AVIQUARY    809.00    4KV RM  OOOV SWGR COMIROL ROO DRIVE EQIXPMENT ROOM                                          AREA ANO WVERTER AREA VEMALATlON OUTSDE AIR WLET DAMPER 24RV.112            'AROGEN (REACTOR PLANT SERVICEI I          CONTAWMENT    812.00      ACCUMULATOR ACCUMULATDRTANKOME4 1 NAROGEN                                          TANK&#xb9;1 AREA SUPPLY/VENT VALVE 24RV.122      0        MAROGEN (REATOR PLANI'SERVICEII          CONTAWMENT    81 2.00      ACCVMUIATOR ACCUMULATOR TANKOME4 2 NAROGEN                                        'ANK&#xb9;2 AREA SVPPLYIVENTVALVE 12      24RV 132      0      'NAROGEN (REACTOR PLANT SERVICEI I        CONTAWMENT      812.00      ACCUMULATOR ACCUMU!ATORTANKOME44 NAROG EN                                            TANK&#xb9;3 AREA SUPPLYIVEMTVALVE 12      24RV.142      0      NAROGEN (REACTOR PLANT SERVICEI I        CONfhINMENT    81200        ACCUMULATOR ACCUMULATOR TANKOME44 NITROGEN                                          TANK&#xb9;4 AREA SUPPLY/VENT VALVE 24RV.149      0          RESOUAL HEAT REMOVR I WEST            CONTAWMENT      812.00      HV~Q 2 FAN RM RESDUAL HEAT REMOVALTo REACTOR COOLANT LOOpS &#xb9;2 AND NdaTS ln HR OPERATED TEST GL          VALVE 24RV 150                  RESOUAL HEAT REMOVALI EAST          CONTAWhtENT    81200      HV~QZ FAN RM RESDUAL HEAT REMOVALTD REACTOR Coouwf LOOPS Nt AMD&#xb9;4 a75 h HR OPERATED TESI'ALVE 24RV.158                      RESDUAL HEAT REMOVALI              CONTAWMENT    598.00      ANNULUS, QUAD No.
ACCUMULATORTANKOME4 1 0.75 W HR                                                1 OPERATED OUTLET AND SAFElY WJECTION To RC LOOP &#xb9;1 COLO LEG TEST VALVE 24RV-1 57      0        RESDUAL HEAT REMOVALI WEST RHR          CONTAWMENT    812.00      HV~O2 FAN RM AND SAFElY WJECTION To REACTOR COOLANT LOOPS N2 AND &#xb9;8 0.75 IN AIR OPERATED TEST VALVE 24RV 158      0    RESDUAL HEAT REMOVALI EAST RHR AND          CONTAINMENT    81200        HV~Q2FANRM
                                        ,  NORTH    SAFElY    WJEClloN To REACTOR COOLAMTPUMPS &#xb9;1 ANO &#xb9;4 0.75 IN AIR OPERATED TEST VALVE 24RV-1 88      0              RESDUAL HEAT REMOVALI              CONTAWMENT    598.00  ~ ANNULUS, QUAD No.
ACCVMULATORTANKOME4 2 0.75 IN AIR                                              2" OPERATED OUfLET AMO SAFElY WJECAON TO RC LOOP &#xb9;2 COLO LEG TEST VALVE 24RV.178                      RESDUAL HEAT REMOVALI ACCUMULATORTANKOME48 0.75 W HR OPERAlED OUTLET ANO SAFETY WJECAON TO RC LOOP &#xb9;8 COLO LEG TEST VALVE 24RV 188                      RESDUAL HEAT REMOVALI                            598.00    ANNULUS, QUAD No.
ACCUMULATORTANKOME44 1 W HR                                                4 OPERAlED OUTLET AND SAFElY WJECAOM TO RC LOOP &#xb9;4 COLD LEG TEST VALVE 12      24RV480                SAFElY WJECAON I SAFETY WJ ECTION            AVXNJARY    587.00      S SAFElY WJ PMP TEST UNE SHUTOFF VALVE                                              RM 24RV410        0            RESDVAL HEAT REMOVALI EAST              AUXIUARY    809.00      E RHR HEAT XCHGR RESDUAL HEAT REMOVALHEAT                                                RM EXCHANGER HE.17E 8 W AIR OPERATED OUllET FLOW CONTROL VALVE 12      24RV411        0        RESDUAL HEAT REMOVALI RESIDUAL              AUXIUARY    809.00      E RHR HEAT XCHGR HEATREMOVALHEAT EXCHANGERS                                                RM BYPASS FLOW 8 W HR OPERATED                                                      '
COMTROL VALVE 24RV420        0          RESOUAL HEAT REMOVALI WEST              AVJQUARY    809.00      WRHRHEATXCHGR RESOUAL HEAT REMOVALHEAT                                                RM EXCHANGER HE.17W 8 W HR OPERATED OVILETFLOW COMIIIOLVALVE 12      24RV40              BORON WJECTION I BORON WJECAON TO          CONTAINMENT    59ILOO      ANNULUS, QUAD No.
ACCUMULATORFILL UME COMIROL VALVE                                                2 12      24RV40        0    SAFEIY WJECAON I SAFETY WJECTION To          CONTAWMENT    598.00      ANNULUS, QUAD No.
ACCUMULATOR FILL LWE CONTROL VALVE                                              2 24tlCR.251      0    NUCLEAR SAMPLWG I STEAM GENERATOR              AUXIUARY    591.00          VESABULE Nl SIEAM SAMPLE MSX.101 COMfAINMENT ISOLATlON VALVE 0    NUCLEAR SAMPUMG I STEAM GENERATOR              AVXIUARY    591.00          VESIIBVLE
                                      &#xb9;2 STEAM SAMPLE MSX.102 CONTAINMENT ISmhTIOM VALVE
 
1/8/96 12:41 PM                    DONALD C. COOK NUCLEAR PLANT UNIT 2                                            &#xb9;                              Page &#xb9;9 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR SEISMIC WALKDOWN Equip      Train                            Sfetem I Equipment Deacnpsm                                            Buikling Boor Bav    Room or Row Cd I
7          1                      NUCLEAR SAhlpuNG I STEAM GENERATOR                                          AUXaJARY    591.00      VESDBULE
                                        &#xb9;3 STEAM SAMPLE MSX.1 03 CONTNNMENT ISO(ATION VALVE 7          2                  0    NUCLEAR SAMPUNG I STEAM GENERATOR                                          AUXNJARY    591.00      VESTIBULE
                                        &#xb9;4 STEAM SAMPLE MSX-104 CONTNNMEHT ISO(ATIQH VALVE 24JRV-1 51  0    NUCLEAR SAMPL&#xb9;IQ I SIEAM GENERATOR                                        CONfAINMENT  812.00    E CONT LOWER
                                            &#xb9;1 STEAM SAMPLE MSX-101 SAMPLE                                                                      VENT RM SHUfQFF VALVE 244RV-1 52  0    NUCLEARSAMPUNG I SIEAM GENERATOR                                          CONTNNMENT  81 2.00    W CONT LOWER
                                            &#xb9;2 STEAM SAMPLE MSX 102 SAMPLE                                                                      VENT'M SHUTOFF VALVE 24(RV 153    0    NUCLEAR SAMPUNG I STEAM GENERATOR                                          CQNTNNMENT  81200      W CONT LOWER
                                            &#xb9;3 STEAM SAMPLE MSX 103 SAMPLE                                                                      VENT RM SHUTOFF VALVE 24IRV-1 54  0  NUCLEAR SAMPUHG I STEAM GENERATOR                                          COHTNNMENT  d1200      E CONT LOWER
                                            &#xb9;4 STEAM SAMPLE MSX.1 04 SAMPLE                                                                    VENT RM SHUTOFF VALVE 24IRV.211    0  MNN STEAM I STEAM GENERATOR &#xb9;1 STOP                                          AUX9JARY    833.00    E MNN STM STOP VALVEMRV 210 STEAM CYLt&#xb9;JER                          TRAN'A'UMP ENCL VALVE 24IRV-2I 2  0  MNNSTEAM I STEAM GENERATOR &#xb9;1 STOP                                          AUX5JARY    83200    E MNN S(M STOP VALVEMRV-210 SlEAM ClhPCXR TRAN (7                                                                        ENCL DUMP VALVE 24IRV-21 3        MNH STEAM I STEAM GENERATOR OME4-1                                          AUXIUARY    833.00    E MAINSlM STOP POWER OPERATED REUEF VALVE                                                                          ENCL 241 RV421        MNN SIEAM I STEAM GENERATOR &#xb9;2 STOP                                          AUXkJARY    CQ.00      W MN STM STOP VALVEMRV420 STEAM CYIJICER                              mNN'A'UMP ENCL VALVE 24IRV.222    0    MNN STEAM I SIEAM GENERATOR &#xb9;2 STOP                                          AUXNJARY    833.00    W MN STM STOP VALVEMRV-220 STEAM CYLJtaJER                          TRNN%'UMP ENCL VALVE 24JRV.223    0    MNH STEAM I STEAM GENERATOR DMS-2                                            AUXIUARY    83200    W MN STM STOP POWER OPERATED RELIEF VALVE                                                                          ENCL 241RV-231        MNN STEAM I STEAM GENERATOR &#xb9;3 STOP                                          AUXIUARY    833,00    W MN SIM STOP VALVEMRV430 STEAM CYUNOER TRAIN                                    'A'UMP ENCL VALVE 24(RV-232    0    MNN STEAM I STEAM GENERATOR &#xb9;3 STOP                                          AUXLlhRY    833.00    W MN STM STOP VALVEMRV430 STEAM CYUNOER TRNH 'P                                                                        ENCL
                                                                                      ~
DUMP VALVE 24(RV 233        MAINSTEAM I SIEAM GENERATOR Oh(EGG                                          AUXRJARY    83300    W MN STM STOP POWER OPERATED REUEF VALVE                                                                          ENCL 24IRV<41    0    MNN STEAM I STEAM GENERATOR &#xb9;4 SfOP                                          AUXaJARY    833,00    E MAINSTM STOP VALVEMRV.240 SfEAM                                        TRNN
                                                                                                          'A'UMP ENCL VALVE 7          2    24IRV.242        MNN STEAM I STEAM GENERATOR &#xb9;4 STOP                                          AUXIUARY    CLLOO    E MNN STM STOP VALVEMRV.240 STEAM CYIJHOER TRNN '(f                                                                    ENCL DUMP VALVE 7,          2 24IRV-243 24IRV 101    0 MNN STEAM I STEAM GENERATOR OhIE~
POWER OPERATED REUEF VALVE NUCLEAR SAMPUNG I REACTOR COQUWT LOOP &#xb9;1 HOT LEG SAMPLE NSX 101 SHUTOFF VALVE AUXLJARY CONTNNMENT 833.00 59(k00 E MNN STM STOP ENCL ANNULUS, QUAD NO.
1 12    24(RV.1 02  0      NUCLEAR SAMPUNG I PRESSUIaZER                                          CONTNNMENl'12.00      NSTRUMENl'AllON UQUID SPACE SAMPLE NSX.1 02 SHUTOFF                                                                        RM VALVE 2WRV 103          NUCLEARSAMPUNG I REACTOR COOLANT                                          CONTNNMENT    598.00  ANNULUS, QUAD NO.
LOOP &#xb9;3 HOT LEG SAMPLE NSX 103                                                                          3 SHUTOFF VALVE 12    2&RV.104            HUCLEAR SAMPUNG I PRESSUREER                                            CONTAINMENT  81200    INSTRUMEHTATlON STEAM SPACE SAMPLE NSX-1 04 SHUTOFF                                                                        RM VALVE 24IRV 151  0      PRESSURIZER    IPRESSURIZERTRNN'8'RESSURE CONTNNMEHT  850.00  PRESSURIZER ENCL, RELIEF VALVE                                                    9ITERIOR 24IRV 152    0      PRESSURIZER I PRESSURIZER TRNN'F                                        CONTAINMENT  85(LOO  PRESSURIZER ENCL, PRESSURE REUEF VALVE                                                                        INTERIOR 24RV-1 53            PRESSURIZER I PRESSURIZER OMEN TRNN 'A'RESSURE REUEF VALVE 24(RV.183    0    REACl'OR COOLANTI REACTOR COQUWT                                          CONTNNMENT  812.00  LOWER CONT, QUAD LOOP &#xb9;3 TO PRESSURIZER SPRAY                                                                        NO. 3 CONTROL 4 tN AIR OPERATED GLOBE VALVE 2&RV.184    0    REACTOR COO(ANTI REACTCR COQUWT                                            COHTNNMEHT  812.00  LOWER CONT, QUAD LOOP &#xb9;4 TO PRESSURIZER SPRAY                                                                        NO. 3 CONlROL 4 tN NR OPERATED GLOBE VALVE 12    243RV.10    0      REACTOR COOLANT PUMP SEAL WATER                                          CONTAINMENT  81 7.00  LOWER CONT, QUAD dhuLEAKOFF I REACTOR COOUWf PUMP 243RV.111 243RV.112 0
0
                                      &#xb9;1 SEAL&#xb9;1 LEAKOFF TO RCPSEALWATER RETURN FILTER QC.1 09 2 IN AIR OPERATED SHUTOFF VALVE LETDONN (CVCS) I REACTOR NORMALLETDOWN TRAIN'A'HUTOFF VALVE LEIQQWN (CVCS) I REACTOR CCKXANT
                                                                                            ~                    CONl'AINMENT CONTNNMENT 812.00 812,00 LOWER CONT, QUAD NO. 4 LOWER CONT, QUAD NORMALlETDOWN TRAN SHUTOFF                    'lf                                                    NO. 4 VALVE 243RV.113    0      LETDOWN (CVCS) I REACTOR COOLANT                                          CQNTNNMENT  812.00  LOWER CONT,QIJAQ EXCESS LETDOWNTO EXCESS LETDONN                                                                          NO. 4 HEAT EXCHANGER HE.13 1 &#xb9;t AIR OPERATEO TRNN                      'lf    SHUfOFF VALVE
 
1/856 12:41 PM                              DONALDC. COOK NUCLEAR PLANT UNIT 2            &#xb9;                            Page &#xb9; 10 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN Equip      Trsin                                      System / Equipment Desert pbon    Buildina  Floor Bw    Roam or Row Col 24jRV 114      0      LETDOWN (GVCSj I REACTOR COOLANT      CONTHNMENT    512.00  LOWER CONT, QUAD EXCESS lElDChMTO EXCESS LHDONN                                        NO. 4 HEAT EXCHANGER HE.1 3 1 TN HR OPERATED TRAN 'A'HUTOFF VALVE 12          Z~V 150                REACTOR COOLANT PUMP SEAL WATER      CQNTHNMENT    SXLOO  ANNULUS, QUAD NO.
NJILEAKQFFI REAGTDR QDQ(ANT pUMps STARlVP SEAL SYSfEM BYPASS TO SEAL WAlER RETURN FILTER QC 100 0.75 IN AIR OPERATED SHUTOFF VALVE 12          24RV 170        0        LETDOWN (GVCSj I EXCESS LETDOWN      CONTHNMENT    512.00 REGEN HEAT XCHGR HEAT EXCHANGER HE-1 3 1 TN AIR                                    RM OPERATED OUTLET PRESSURE CONmOL VALVE 12          24RV 171        0        LEIDQWN (CVCSI I EXCESS LETDOWN      CONl'AINMENT  512.00 REGEN HEAT XCHGR HEAT EXCHANGER HE.1 3 1 TN HR                                    RM
                                                " OPERATED    OUTLET (XVERSION VALVE 12          24RV 20        0      REACTOR COOLANT PUMP SEAL WhlER      CONTHNMENT    525.00 LOWER CONT, QUAD
                                                %4uLEAICOFF I REACTOR COOLANT PUMP                                    NO. 2 52 SEAL 51 (EAKOf F TO RCP SEAL WATER RETURN FLTER QC.1 00 2 TN AIR OPERATED SHUTOFF GLOBE VALVE 12          ZCRV.251        0    'HARGING (GVCSI I CVCS CENTRIFUGAL        AUXIJARY    587.00    RECPR COATING CHARGING PUMPS DISCHARGE FLOW 3 TN                              CHARD PMP RM HR OPERATED CONTROL GLOBE VALVE 12          Z~V40                  REACTOR COOLANT PUMP SEAL WATER        COMTAINMEMl'12.00    LOWER CONT, QUAD NJILEH(QFF I REACTOR COOLANT PUMP                                    NO. 3 tl 53 SEAL LEAKOFF TO RCP SEAL WATER
                                            .RElURN FILTER QC-100 2 TN AIR OPERATED SHUTOlV GLOBE VALVE 12                          0      REACTOR COOLANT PUMP SEAL WATER        CONTHNMEMT    512.00  LOWER CONT, QUAD 0UILEAKOFFI REACTOR COOLAMTPUMP                                      NO. 4 54 SEAL 51 lEAKOFF TO RCP SEAL WATER RETURN FILTER QC.100 2 TN AIR OPERhlED SHUTOFF GLOBE VALVE 12          24ZRV~          0        BORON MAKEUP (GVCSI I SOUTH BORC      AUXSJARY    800.00    VQL CTRL TANKE A(ZD BLENDER QP.21 2 TN AIR OPERATED                                HALLWAY TD CVCS CHARGING PUMPS SUCDQN SHUTOFF VALVE 12          24ZRV<21        0        BORON MAKEUP (GVCSI I SOUTH BORIC      AUXIUARY    587.00    BORIC AG8) STOR AGO Fa.TER TO CVCS CHARGING PUMPS                                TANKAREA ANO SOUTH BORIC ACID BLENDER 1 fN HR OPERAlED FLOW COMTRQL GLOBE VALVE 12                          0        BORON MAKEUP (CVCSI I SOUTH BORIC      AUXIUARY    587.00    BORIC ACID STOR ACO STORAGE TANKTK 12S 2 TN HR                                  TANKAREA OPERATED INLETFLOW CONTROL GLOBE VALVE 12          24ZRVM1        0      BORQNMAKEUP (GVCSII SOUTH BORIC        AUXLIARY    50k00    VOL GIRL TANKE ACO BLENDER QP-21 TO REACfDR                                    HALLWAY (XXXANTLETDOWN VOt.UME COMTROt.
TANKSHUTOFF VALVE 12          24V 101        0    ~ NITROGEN (REACTOR PLANT SERVICEI I      AUXIUARY                  Sl'ARIVP 501.00 I8TROGEN SUPPLY HEADER TO                                  SLOWDOWN
                                                  ~
ACCUMU(ATORTANKS SAFElY VALVE                                  FLASHl'ANKR M 12  ...:    24V-102,  - - 0        RES5XIAL HEAT REMOVALI RESIDUAL HEAT REMOVALTO REACTOR COOLANT LOOPS PZ 8 83 COLD LEGS SAFElY VALVE 12            24V-1 03      0                    HEAT REMOVALI REACTOR    CONTHNMEMT    5%LOG  ANNULUS, QUAD NQ.
COOLAMl'LOOP 82 HOT LEG TO RESIDUAL                                      2 HEAT REMOVALPUMPS SAFETY VALVE 24V-104E      0            RESOVAL HEAT REMOVALI EAST          AUXIUARY    50k00  E RHR HEATXCHGR RESTIVAL HEAT REMOVALHEAT                                        RM EXCHANGER HE.17 E OUTLET SAFElY VALVE 1      '4V.104W                        RESOUAL HEAT REMOVALI WEST          AUXIUARY    500.00  W RHR HEATXCHGR RESOUAL HEAT REMOVALHEAT                                          RM EXCHANGER HE 17W OUTLET SAFETY VALVE 24V 120AB        0      IXESEL STARRNG HR I 24(TC301 8 Z.XTC      AUXIUARY    587.00  AB EMER OSL GEN 302 CONTROL AIR SAFElY VALVE                                      RM 24V 120CD              'XESEL STARTING AIR I Z.XTC308 ANO 2      AUXNJARY    587.00  CO EMER DSL GEN XTC307 CONTROL AIR SAFElY VALVE                                      RM 12          24V 121        0    COMPONENT COQUNG WATER I 24jRtu300        AUXIUARY    501.00        STARIVP SAMPLE HEAT EXCHANGERS CCW RETURN                                    BLOWDOWN HEADER SAF ElY VALVE                                  FLASHTANKROOM 12        24V.1 2243      0    CCWI REACTOR SUPPORT COOLERS CGW          CONTAINMENT  5@Lee    ANNULUS, QUAD NQ.
RETURN HEADER SAF ElY VALVE                                        3 24V-1224                CCW I CCW TO CQNl'ENTILATION FAN      CQNTHNMENT    525.00    HV4EQ-2 FAN RM HVCEQ 2 MOTOR AIR COOLER CCW OUTLET SAFETY VALVE 24V.1 22%      0  COW I CQNTAINMMENTVENT FAN HV4EQ 1        CONTHNMENT    525.00    HV4EQ-1 FAN RM MOTOR AIR COOLER CCW OUTLET SAFElY VALVE 24V 130%a                (XESEL STARTING AIR I AB EMERGENCY      AUXIUARY    587.00    AB EMER OSL GEN DIESEL STAImNG AIR TO TURBOCHARGER                                      RM SAFETY VALVE 24V.13&CD        0      IXESELSTARTuiGAIRICOEMERGENCY            AUXIUARY    587.00    CO EMER OSL GEN (XESEL SThlmNG AIR TO TURBOCHARGER                                        RM SAFETY VALVE 12          24V.140  1      0    AUXmJARYFEEQWATER I TUR Bur E DRIVEN        TURBINE    501.00    TB DRIVEN AUX AUX FEED PUMP GOVERNOR OIL COOLER                                  FDWIR PMP COOLING WATER NLET SAFETY VALVE
 
1/8I96 12:41 PM                        DONALD C. COOK NUCLEAR PLANT UNIT 2          &#xb9;                                Page &#xb9;11 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN Eqrap      Train                                Statem  I Equipment DeaorIFQon    Buetany      Boor Eiev    Room or Row Col 7          12      24V-1 40.2    0  ALOQUARYFEEDWAlER I TURBINE DRIVEN        TVRBWE          501.00    lB DRIVEN AUX AUXFEED PUMP QL COOLER COOUNG                                        FDWTR PMP WATER NLET SAFETY VALVE 7          2        24v 14E      0      ESSEMIIAL SERVICE WATER I EAST        AUXIJARY        808.00  E CONT SPRAY HEAT COMTAWMENT SPRAY HEAT EXCHANGER                                        XCHGR RM    ~
H E-1 8E SHELL SIDE SAFElY VALVE 24v 1 ew      0      ESSEMllhL SERVICE WAlER I WEST        AUXklARY        000.00    W CONT SPRAY CONTANMENTSPRAY HEAT EXCHANGER                                      HEATXCHGR RM HE-1 8W SHELL SIDE SAFETY VALVE 24V 15E      0      ESSEMllAL SERVICE WATER I EAST        AUIQUARY        000.00      800 HALLWAY COMPONENT COOUNG WAlER HEAT EXCHANGER HE.15E lVBE SOE SAFEIY VALVE 24V 15W      0      ESSENllAL SERVICE WATER I WEST        AVXmJARY        000.00      000 HALLWAY COMPOMEMl'COOUNG WATER HEAT EXCHANGER HE.1 SW lUBE SDE SAFElY VALVE 24V.1 0he      0        ESSIMlhL SERVICE WATER I AB        AVXRJARY        587.00  AB EMER DSL GEN EMERGENCY QESEL JACKET WATER                                              RM COOLER GT 131 4B ESSEMllAL SERVICE WATER OUTLET SAFElY VALVE 24V 10CD                ESSEMIlAL SERVICE WATER I CD        AIIIQUARY      587.00    CDEMERDSLGEN EMERGENCY QESEL JACKET WATER                                              RM COOLER CIT-1 31 CD ESSENllAL SERVICE WAlER OUTLET SAFElY VALVE 12      24V 180      0      CCW I POSTACCOENT SAMPLE HEAT          AUXIJARY        587.00  NUCLEAR SAMPUNG EXCHANGER CCW RETURN HEADER                                              RM SAFElY VALVE 24V.1 00E    0    AVXQJARYFEEDWAlER I EAST MOTOR          TVRBNE          501.00    E MlR DRIV AVX DRIVEN AUIQLIARYFEEDWATER PUMP PP                                    FEEDWTll PMP 3E SUCTION SAFEIY VALVE 24V 10OW      0    AVX8JARYFEEDWATERIWESTMOTOR              TVRBWE          501.00  W MTR DRIVEN AUX DRIVEN AVIQUARYFEED PUMP PP4W                                        FDWIR PMP SUCTION SAFElY VALVE 24V.lh 1          MAWSTEAM I STEAM GENERATOR OME4-1        AVX8JARY        033.00    EMANSTMSTOP SAFElY VALVE1A                                              ENCL 24V 1AG      0  MAN STEAM I STEAM GENERATOR OME4 2        AVXIUARY        033.00    W MN STM STOP SAFElY VALVE1A                                              ENCL 24V 1A4          MANSTEAM I STEAM GENERATOR OME44          AUXILIARY        033.00    W MN STM STOP SAFElY VALVE1A                                              ENCL 24V 1PA      0  MAN SIEAM I STEAM GENERATOR OME44        AVIQUARY        033.00    E MAINSTM Sl'OP SAFETY VALVEN A                                              ENCL 24V.1 8.1    0  MAINSTEAM I STEAM GENERATOR OME41        AVXNJARY        033.00    EMANSTMSTOP SAFElY VALVE18                                              ENCL 24V 18-2          MANSTEAM I STEAM GENERATOR OME4-2        ALOQUARY        033.00    W MN STM STOP SAFEIY VALVE18                                              ENCL 24V.1 84      0    MAIMSTEAM I STEAM GENERATOR OME44        AVXIUARY        0XLOO      W MN SIM STOP SAFElY VALVE18                                              ENCL 24v.1 Se          MANSTEAM I STEAM GENERATOR OME44          AVXNJARY        CLLQQ      E MAINSTM STOP SAFETY VALVE18                                              ENCL 24V 2OILAB    0    DESELFVELOIL/ABEMERGENCY DESEL            AVXIUARY        587.00    ABEMERDSLGEN FUEL DL MANIFOLDSTO FUEL QL DAY                                            RM TANK SAFETY VALVE 0    DESEL FUEL OIL I CD EMERGENCY QESEL      AUXIUARY        587.00    CDEMERDSLGEN FUEL DL MANIFOLDSTO FUEL OIL DAY                                          RM TANK SAFElY VALVE 24V-201 481    0    DESEL FUEL DL I AB EMERGENCY DIESEL      AVXQJARY        587.00    AB EMER DSL GEN FRONT BANKFVEL DL MANIFOLDSAF ElY                                            RM VALVE 24VQOMB2            DESEL FUEL CXL I AB EMERGENCY DESEL      AVXIUARY        587.00    AB EMER OSL GEN REAR BANKFUEL DL MANIFOLDSAFETY                                            RM VALVE 24V.201 4D1    0    DIESEL FVEL DL I CD EMERGENCY QESEL      AVXIUARY        587.00    CO EMER OSL GEN FROMl'ANKFUEL OIL MANIFOLDSAFElY                                            RM VALVE 24V-201 4D2    0    QESEL FUEL OIL I CD EMERGENCY DIESEL      AVXIUARY        587.00    CD EMER DSL GEN REAR BANKFUEL OIL MANIFOlDSAFETY                                            RM VALVE 24V-2A 1          MAN SlEAM I STEAM GENERATOR OME4.1        AUXIUARY        033.00    E MAINSTM STOP SAFETY VALVE2A                                              ENCL 24V-2A-2    0    MAN STEAM I STEAM GENERATOR OME4 2        AVIQIJARY        CLLOO      W MM STM STOP SAFElY VALVE2A                                              ENCL 24V~              MAN SIEAM I STEAM GENERATOR OME43        AUXIUARY        033.00      W MN STM StOP SAFElY VALVE2A                                              ENCL 2    24V~          0    MAN STEAM I STEAM GENERATOR OME~          AVXIUARY        033 00    E MAN STM STOP SAFElY VALVE2A                                              ENCL 24V~1              MAN STEAM I STEAM GENERATOR OME4.1        AtgQUARY        033.00    E MAN STM STOP SACElY VALVE28                                              ENCL 24V48-2      0    MANSTEAM I STEAM GENERATOR OME4 2        AVXRJARY        033.00      W MN STM STOP SAFETY VALVE28 24V~              MAN STEAM I STEAM GENERATOR OME43 SAFElY VALVE28 AVXIUARY    '33.00                ENCL W MN STM STOP ENCL 24V-2ILe      0    MAW STEAM I STEAM GENERATOR OME44        AVIQLIARY      033.00    E MAINSTM STOP SAFElY VALVE28                                              ENCL 24V4 1      0    MAN SIEAM I STEAM GENERATOR OME4.1        AVIQUARY        033.00    E MAINSTM STOP SAFETY VALVE<<3                                              ENCL 24V4-2            MAN STEAM I STEAM GENERATOR OME4 2        AVXIUARY        033.00    W MN STM STOP sAFElY vALYE<<3                                              ENCL MAW STEAM I SIEAM GENERATOR OME44        AVXLIARY        03LOQ      W MN STM STOP SAFEIY VALVE<<3                                              ENCL
 
1/8$ 6 12:41 PM                    DONALD C. COOK NUCLEAR PLANT UNIT 2              &#xb9;                            Page    &#xb9; 12 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN Eqvip      Train                                                                    BuridaKI Floor Bev    Room or Row Col 7          2                  0  MANSTEAM I STEAM GENERATOR OME~                AUXIUARY    033.00    E MANSTM STOP SAFElY VALVE63                                                ENCL 7          12      24V~                PRESSVRIZER I PRESSURIZER OMEN SAF EIY VALVE'A' 7          12'    24V~                PRESSURIZER I PRESSURIZER OMEP          CONTAINMENl'50.00      PRESSURIZER SAFETY VALVE'If                                                      EN'TERIOR 12                          PRESSURIZER I PRESSUREER OMEQ SAFElY VALVEC' 7          12                        REACTOR COQUNT PUMP SEAL WATER            CONTANMENT    595.00  ANNULVS,QUAD NO.
NJILEAKOFFI RC PVMPS SEAL 61 ANO                                            3 STARTUP SEAL SYSTEM BYPASS TO SEAL WATER RElURN F8 TERS SAFElY VALVE 12      24V41      0    LEIOOWN (CVCS) I REGENERATWE HEAT          CONTAINMENT  598.00  ANNULUS, QUAD NO.
EXCHANGER HE-12 LEIDOWNOUTLET                                              4 SAFElY VALVE 12                  0    REACTOR COOLANT PUMP SEAL WATER            ~ AUXIUARY  009.00    SEAL WlR HEAT NJILEAKOFFI REACTOR CCKXANTPUMP                                        XCHGR RM SEAL WATER HEAT EXCHANGER HE-11 SAFEIY VALVE 12      24V40  ,  0        LETDOWN (CVCS) I CVCS CHARGNQ              AUXIUARY  557.00    REQPROCATNQ PUMPS SUCTION HEADER SAFElY VALVE                                    CHARQ PMP RM 12                            COMPONENT COCLNG WATER I                AVWUARY    050.00      050 HALLWAY COMPONENT COOUNQ WATER SURGE TANKTlCS7 SAFElY VALVE 24V4MB      0    DIESEL JACKETWATERIABEMERGENCY                AUXIUARY,587.00      AB EMER DSL GEN IXESEL AUXLIARYJACKET WATER HEATER                                            RM
                                                        ~
QT.1 34AB SAFElY VALVE 24V41CD      0    DIESEL JACKET WATER I CO EMERGENCY            AUXuARY    587.00    CD EMER OSL GEN IxEBEL AUxaJARY JAGKET wATER HEAlER                                            RM QT-1 34CO SAFEIY VALVE 12    24V42.1    0    CCW I REACTOR            PUMP PP~1        CONTAINMENT  017.00  LOWER CONT, QUAD lHERMALBARRER CCW OVllETSAFElY                                            1hZ 48 VALVE 12    24V42.2    0  CCW I REACTOR COOLANl'UMPS PP~2              CONTANMENf    017.00  LOWER CONT, QUAD THERMALBAIUBER CCW OUTLET SAFElY                                        NO. 2, AZ 132 VLV 12                  0    COW I REACTOR COOLANT PUMP      PP~        CONTAWMENT    017.00  LOWER CONT., QUAD THERMALBARRIER CCW OUTLEf SAFETY                                          3 hZ 231 VALVE 12      24V424      0    CCW I REACTOR COOLANT PUMP      PP~        CONTANMENT    017.00  LOWER CONT., QUAD THERMALBARRIER CCW OUllETSAFElY                                          4, AZ 302 VALVE 12      24V43          CCW I REACTOR COOLANfPUMP MOTORS            CONTHNMENT    012,00    W CONT LOWER BEARING OL COOLERS CCW REIURN                                        VENI'M HEADER SAFETY VALVE 12                  0          CCW I EXCESS LETDOWN HEAT            CONTAINMENT  012.00  REGEN HEAT XCHGR EXCHANGER HE-13 CCW OV1LET SAFETY                                            RM VALVE 12      24V45          CCW I LEIDOANHEAT EXCHANGER HE-1 4              AUXIUARY  033.00      033 HALLWAY CCW OUILET SAFElY VALVE 12      24V40    0    ccw Iccw To soUTH BQRIO hclo Evhp              AVXIUARY  557.00      587 HALLWAY DRUM 124IE-1 9OS SAFElY VALVE 12      24V47.1        CCW I FAILED NUCLU&lRFUEL DETECTOR            AUXIUARY    587.00      REFUEL WlR SAMPlE HEAT EXCHANGER QC401.1 3                                  PURFICATlON PMP CCW OUTLET SAFETY VALVE                                              RM 12      24V47.2    0    CCW I NUCLEAR SAMPUNG SAMPLE RACK              AVX8JARY    557.00  NUCLEAR SAMPUNQ "A'CWRETURN HEADER SAFETY VLVE                                                RM 12                0    CCW I NUCLEAR SAMPLNQ SAMPLE RACK              AUXuARY    587.00    NUCLEAR SAMPUNQ
                                      %'CW RETURN HEADER SAFETY VALVE                                              RM 12    24V48.1 5                CCW I RCP SEAL WATER HEAT              AVXIUARY  609.00      009 HALLWAY EXCHANGER HE-11 CCW OUfLET SAFElY VALVE 12      24V-71    0        CCWISOUlH SPENT FUELPITHEAT                AUXIUARY  609.00      SPENT FUEL Prf EXCHANGER 124IE 16S CCW OUTLET                                    HEAT XCHGR RM SAFElY VALVE 0      COMPONENf COOUNG WATER I                    AUXIUARY  009.00      eXI HALLWAY HEAT REMOVALHEAT EASl'ESOUAL EXCHANGER HE 17E COMPONENT COOUNQ WATER OUTLET SAFElY VALVE 24V 72W    0      COMPONENT COOLNG WATER I WEST              AVXIUARY    033.00      033 HALLWAY RESDVAL HEAT REMOVALHEAT EXCHANGER COMPONENT COOUNG WATER OUllET SAFETY VALVE 24V.78481    0      DIESEL SfhRIWG HR I AB EMERGENCY            AVXIUARY    557.00    AB EMER OSL GEN IXESEL STARllNG AIR RECBVER QT.141 ~                                        RM A$1 SAFElY VALVE 24V 78&82    0      DIESEL STARllNG AIR I AB EMERGENCY          AVXIUARY    587.00    AB EMER OSL GEN DIESEL STARTWG HR RECBVER QT.1 41 ~                                          RM A82 SAFElY VALVE 24V.70CO1  0      fXESEL SfARlWQ NR I CO EMERGENCY            AVXIUARY    587.00    CD EMER DSL GEN DIESEL SfhRTWG AIR RECBVER QT.141                                            RM CO1 SAFETY VALVE 24V 70CD2          DIESEL SfARTWG AIR I CD EMERGENCY            AUXIUARY    587.00    CD EMER DSL GEN DIESEL STARTlNG AIR RECBVER QT 141                                          RM CD2 SAFElY VALVE 24V.79h81          DIESEL STARTWG AIR I AB EMERGENCY            AUXIUARY    557.00    ABEMERDSLGEN fXESEL CONTROL AIR DRYER QT.1 43JI81                                          RM SAFETY VALVE 0      fXESELSTARTWQA6TIABEMERGENCY                AVXIUARY    557.00    AB EMER OSL GEN DIESEL CONTROL AIR DRYER QT 143-A82                                          RM SAFETY VALVE
 
1/8/96 12:41 PM                  DONALD C. COOK NUCLEAR PLANT UNIT 2              &#xb9;                        Page  &#xb9; 13 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR SEISMIC WALKDOWN Equip      Tran                                                                  Bu>io>n0 Hoor Bov    Room or Raw Col 2@V-70401  0      QESEL SfhRTWQ HR I CD EMERGENCY            AIBOIJARY  587.00    CO EMER DSL GEN QESEL CONlROL AIR DRYER QT-1 45401                                      RM SAFElY VALVE 0      DESEL STARTWG AIR I CD EMERGENCY            AUX8JARY  587.00    CD EMER DSL GEN QESEL CONTROL HR DRYER QT-145402                                        RM SAFElY VALVE 7          2                0    CONTROL ROOM HR CONDITIONWG CHILL            AlDOUARY  850.00  CTRL RM AIR COMDT WATER I CONTROL ROOM AIR                                          RM CONDAlONWQ NORTH CHILLWATER EXPAMSCN TANKTK-78N SAFElY VALVE 0    CONlRQL ROOM AIR CONDTIONWQ CHILL            AVX8JARY  85000  CTRL RMAIRCONDIT WATER I CONTROL ROOM HR                                            RM CONDfllONNQSOUTH CNLLWATER EXPANSCN TANKTK-78S SAFETY VALVE 12                0  ' REFUEUNQ WATER STORAGE TANK                  AI00UARY  587.00    S SAFETY WJ PMP SUPPLY I SAFETY WJECTCN PUMPS                                        RM SUCllON HEADER SAFElY VALVE 12      2~417    0      BORON WJECTION I BORON IMJECllON          ALBQUARY  812.00  BORON WJ TANKRM TANKTK-11 OUTLET SAFETY VALVE 12                0        SAFElY WJECIIQN I NQRlH SAFEIY            AUX8JARY  587.00    N SAFETY WJ PMP WJECTTQN PUMP PP-28N DSCHARGE                                        RM
                                              'HEADER SAFElY VALVE 12                0        SAFEIY IMIECIIQNISOUTH SAFETY            AUXNJARY    587.00    S SAFETY WJ PMP WJECTKW PUMP PP-28S QSCHARGE                                          RM HEADER SAFETY VALVE 2-VRV41 5  0    CONTROL ROOM AIR CQNQITIONWG CHILL          AUX!VARY    850.00  CTRL RM AIR CQNDIT WATER I CONIROL ROOM VEMTllhTION                                      RM UNT HYDRA-1 CHILLWATER INLEf/BYPASS VALVE 0    CONTROL ROOM AIR CONDITIONWG CHILL          AUXIUARY    850.00  CTRL RM HR CONDIT WATER I CONTROL ROOM VEMTILATCN                                        RM UNfHYDRA-2CHILLWATER WLEf/BYPASS VALVE 2.WRV-72240  0          ESSENllAL SERMCE WATER I CD            AIDQUARY    587.00    CD EMER DSL GEN EMERGENCY QESEL NORTH COMBUSTION                                        RM AIR AFTERCQOLER HEA740M ESW WLET/BYPASS VALVE 2-WRV 72440  0          ESSEMIIAL SERVICE WATER I CD          AVXIUARY    587.00  CD EMER DSL GEN EMERGENCY DIESEL SOUTH COMBUSTTOM                                        RM HR AFIERCQQLER HEP740S ESW INLET/BYPASS VALVE 2.WRV 725hB  0          ESSENllAL SERVCE WATER I AB            AUXIUARY    587.00  AB EMER DSL GEN EMERGENCY QESEL NORTH COMBUSllON                                          RM AIR AFTERCOOLER HEPT~ ESW 7          1  2-WRV 72548  0,              WLET/BYPASS VALVE ESSENllALSERVICE WATER/AS EMERGENCY DIESEL SOUTH COMBUSTION AUXIUARY    587.00    AB EMER DSL GEN RM HR AFTERCOOLER HEST~ ESW WLEf/BYPASS VALVE Z-WRV.788  0        ESSEMIIAL SERVICE WATER I EAST        SCREENHOUSE  501.00  E ESSNTL SERV WTR ESSENIIAL SERVICE WATER PUMP PP.7E                                    PMP RM DISCHARGE STRAINER WEST BASKET BACKWASHOUTLET SHUTOFF VALVE 2-WRV 784  0        ESSENTIAL SERVICE WATER I WEST        SCREENHOVSE  591.00    W ESSNTL SERV
                                  'SSENTIAL SERVICE WATER PUMP PP 7W                                    WTR PMP RM QSCHARGE STRAWER WEST BASKET BACKWASHOUTLET SHUTOFF VALVE 2.WRV 788            ESSENTIAL SERVICE WATER I EAST        SCREEMHOUSE  591.00  E ESSMIL SERV WIR ESSEMIIAL SERVCE WATER PUMP PP TE                                      PMP RM DSCHARGE SlRAINER WEST BASKET BACKWASH INI.ET SHUTOFF VALVE Z.WRV.780            ERiEMIIALSERVICE WATER I              SCREENHQVSE  501.00    W ESSNTL SERV SERVCE WATER PUMP PP-7W WESI'SSEMRAL WTR PMP RM DSCHARGE STRAINER WEST BASKET BACKWASHINLETSHUTOFF VALVE 2-WRV 778  0        ESSIWTIAL SERVICE WATER I EAST        SCREENHOUSE  591.00  E ESSNTL SERV WIR ESSENIIAL SERVICE WATER PUMP PP.7E                                    PMP RM DSCHARGE STRAWER EAST BASKET BACKWASH OUTLET SHUTOFF VALVE 2-WRV.774  0        ESSENTIAL SERVICE WATER I WESf          SCREENHOVSE  591.00    W ESSMIL SERV ESSENTIAL SERVICE WATER PUMP PP 7W                                    WTR PMP RM QSCHARGE STRAWER EAST BASKEf BACKWASHOUTlET SHUTOFF VALVE 2.WRY.778  0        ESSENllAL SERVICE WATER I EASf        SCREENHOVSE  501.00  E ESSNTL SERV WTR ESSCNllAL SERVCE WATER PUMP PP.7E                                      PMP RM DLCHARGE STRAWER EAST BASKET BACKWASH INLETSHUTOFF VALVE 2.WRV.770            ESSEIITIAL SERVICE WATER I WEST        SCREENHQUSE  501.00    W ESSNTL SERV ESSEMRAL SERVCE WATER PUMP PP 7W                                      WTR PMP RM QSCHARGE STRAWER EAST BASKET BACKWASH WLET SHUTOFF VALVE 24QtV-220  0      lXESELSl'ARTING HR I AB EMERGENCY          AUXIUARY  587.00    AB EMER OSL GEN QESEL STARTWG AIR JET ASSST CONTROL                                        RM VALVE Z~V-221          DESEL STARTWG AIR I AB EMERGENCY            AVXIUARY  587.00    AB EMER DSL GEN DIESEL FRONI'ANKSTARTWQ HR                                          RM SHUTOFF VALVE 24(RV.ZZZ        DESEL STARTINQ AIR I AB EMERGENCY          AUXIUARY  587.00    AB EMER DSL GEN QESEL REAR BANKSTARllNG AIR                                          RM SHUTOFF VALVE
 
1/8/96 12:41 PM                  DONALDC. COOK NUCLEAR PLANT UNIT 2                              &#xb9;                          Page  &#xb9; 14 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN I'qrnP                Equipment ID                System/ Equipment Descrr p6on                        Buildiny Boor Eiev  Room or Row Col 2-XRV.225          DIESEL SfhRTNQ HR I CO EMERGENCY                            AUXIUARY    507.00  CD EMER DSL GEN DIESEL STARRNQ HR JET ASSST COMBtOL                                                      RM VALVE 7          2  2-XRV.220    0    DIESEL STARDNQ AIR I CD EMERGENCY                          AUXIUARY  507.00  CD EMER DSL GEN IXESEL FRONT BAHKSTARTNQ HR                                                        RM SHUfDFF VALVE 7          2  2JIRV~
2CCLWSI 0
0  COMPQIIENT    ~
DIESEL STARTINQ AIR I CD EMERGENCY
                                            , IXESEL REAR BANKSTAIWNG AIR SHUTOFF VALVE WATER I RC PUMPS BEARING OIL COOLERS CCW RETURN I%ADER TRAIN'A'OMTHNMEMf SOIATIOMVALVE AUXIUARY AVXXJARY 507.00 591.00 CDEMERDSLGEN RM STARTVP BLOWDOVW FLASHTANKRM 0  COMPONEMf COOUNQ WATER I RC PUMPS                            AUXIUARY  591.00        STARTVP
                                          + BEAR9IQ OL COOLERS CCW RETURN                                                      BLOWDOlhN ISADER TRHN 'If CQMTHNMEMT                                                  FLASHTANKRM IQXATlONVALVE 0      COMPONENT CQOUNQ WATER I RCP                              AUXIUARY  591.00        STARTUP THERMALBARRSR COMPONENT COOUNQ                                                        BLOWDQWN WATER QtflLET TRHN 'A'ONTHNMEMT                                                    FLASHTANKRM ISOLATION VALVE COMPONENT CQOUNQ WATER I RC PUMPS                            AUXOJARY  59 I.CO        STARTUP THERMALBARRER CCW RETVRM HEADER                                                      BLOWDOWN lRAIN%'ONTAINMENT ISQthllOM VALVE                                                  FLASHTANKRM COMPONENT COQUNQ WATER I                              AUXIUARY  591.00        STARlVP
                                            'OMPONENT COQUNQ WATER TO                                                          SLOWDOWN REACTOR COOLANT PUMPS TRAIN              'A'ONT FLASHTANKRM HNMENTISOLATIOMVALVE COMPONENT COOUNQ WAlER I                              AUXIUARY                  STARlVP COMPONENT CQQUNG WATER TO                                                      SLOWDOWN CIXXANTPUMPS TRAIN                    'EACTOR FLASHfANKRM ISOLATION VALVE 2~1
                                                                                    '8'ONTHNMENT 0    0      COMPONENT OQQUNG WATER I EAST                              AUXIUARY  N9.00      N9 HALLWAY COMPONENT COOUNQ WATER HEAT
                                            'XCHANGER HE-15E COMPONENT COOUNG WATER OUTLET SHUTOFF VALVE 2~11                      COMPONENT COOUNG WATER I COMPONENT COOUNQ WATER PUMPS AUXIUARY  NO.OO      009 HALLWAY SUCICN CROSSRE TRAIN 'A'HUTOFF VALVE 2~~12                    COMPONENT COOUNQ WATER I                              AVXIUARY    009.00      009 HALLWAY COMPOHEMT COOUNG WATER PUMPS DSCHARGE CROSSTIE lRAIN'A'HUTOFF VALVE 2~15          0          COMPONENT COQUNQ WAlER I COMPONENT COOUNG WATER PUMPS AvxaJARY    N9.00      009 HALLWAY SUCllON CROSSRE TRAIN 'E SHUTOFF VALVE 2~14                      CQMPQNEMI'OOUNQ WATER I COMPOHEMT COOUNG WAlER PUMPS AUXIUARY    009.00      N9 HALLWAY DSCHARGE CROSSIIE TRAN %'HVfOFF VALVE 2CMO415                  COMPONENT COOUNG WATER I                              AUXNJARY    009.00      N9 HALLWAY COMPONENT COOUNQ WATER TO MISCELlANEOUS SERVCE TRAN VALVE          'A'HUTOFF 2~10                COMPONENT COQUNG WATER I CCW TO MSCELLANEOUS SERVCE HEADER            'If AUXNJARY  009.00      N9 HALLWAY 10 In MOTOR OPERATED SHUTOFF VALVE 2~19          0      COMPONENT COOUNG WATER I EAST RESGUAL HEAT REMOVALHEAT AVXNJARY  N9.00      009 HALLWAY EXCHANGER HE-17E COMPONENT CQOUNQ WATER OUTLET SHUTOFF VALVE COMPONENT COQUNG WATER I WEST                              AUXIUARY  009.00      009 HALLWAY COMPONEMf COOUNQ WATER HEAT EXCHANGER COMPONENT COOUMG WATER OUTLET SHUTOFF VALVE 0    COMPONENT CQQUNQ WATER I WEST RHR                            AUXIUARY  CLIO        053 HALLWAY HEAT EXCHANGER HE-17W CCW OtflLET SHUTOFF VALVE 2+MD.211      0    AUXIUARYFEEDWATER I TURBINE DRIVEN                            AUXIUARY  012.00    EMAINSfMSTOP ALOOUARYFEED PUMP PPC OSCHARGE                                                          ENCL.
TO SIEAM GENERATOR OMEQ-1 4 tn MOTOR OPERATED COMIROL VALVE 2+MO-212      0      AUXLIARYFEEDWATERIWESTMOTOR                                AUXIUARY  012.00    E MHN STM STOP DRIVEN AVXIUARYFEEDWATER PUMP                                                          ENCL SUPPLY TO SiEAM GENERATOR OMEQ-1 4 In MOTOR OPERATED CONTROL VALVE 2+ MORI            AVXIUARYFEEQWATERI TURBINE DRIVEN                            AUXIUARY  591.00        STARTVP AUXIUARYFEED PUMP PPQ DSCHARGE                                                      BLI7IVDQWN TO SIEAM GENERATOR OMM-2 tn MOTOR OPERATED COMIIIQL VALVE i                                            FIASHTANKRM 2+MO 222      0      AUXNJARYFEEDWATER I EAST MOTOR                              AVXIUARY  591.00        STARTUP DRIVEN AIOOUARYFEEDWATER PUMP PP.                                                    SLOWDOWN 5E SUPPLY TO STEAM GENERATOR OMEW                                                    FIASHTANKRM 2 4 In MOTOR OPERATED COMIROL VALVE 2+MO.231      0    AUXIUARYFEEDWATER I TURBINE DRIVEN                            AUXIUARY  591.00        STARTVP AIDOUARYFEED PUMP SUPPLY TO STEAM                                                    BLOWDONN GENERATOR OME~ 4 In MOTOR                                                    FLASHTANKRM OPERATED CONTROL VALVE
 
1N/96 12:41 PM                    DONALD C. COOK NUCLEAR PLANT UNIT 2              &#xb9;                            Page  &#xb9; 15 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR SEISMIC WALKDOWN ap        '                                  System  I Equi pment Descripten    Buedin9  floor Eiev    Room or Row Col Q                                  0                                  I AUXLIARYFEEDWATER EASf MOTOR DRIVEN AIBQUARYFEEDWATER PUMP PP-ANQUARY    501.00          STAR TUP BLOWDOHN 3E SUPPLY TO STEAM GENERATOR OME4-                                  FLASHTAMKRM 3 4 In MOTOR OPERATED CONTROL VALVE 2~241        0    ANQUARYFEEDWATER I TURSNE DRIVEN            AUXLIARY    812,00    E MHMSIM STOP AVXLIARYFEED PUMP SUPPLY TD STEAM                                          ENCL GENERATOR OME~ 4 In MOTOR OPERATED COMIROL VALVE 24'MQ.242    0      ANQUARYFEEDWATER I WEST MOTOR              AUXLIARY    51200      E MHN STM STOP DRIVEN AIDQUARYFEEDWATER PUMP                                          ENCL SUPPLY TO STEAM GENERATOR OME~ 4 In MOTOR OPERATED CONTROL VALVE 2+IV47QP~I      0            IXESEL ROOM VEMILhllON AB      I    ANQUARY    587.00    ABEMERDSLGEN EMERGENCY IXESEL GENERATOR ROOM VENlXATIONEXHAUSl'FANHVAR.2 TEMPERING AIR DAMPER 2+IV4IQP~        0            IXESEL ROOM VENBLATIONI AB                      587.00    AB EMER DSL GEN EMERGENCY DIESEL GENERATOR ROOM                                            RM VENTLATIONSUPPLY FAN HVJ3GS 2 TEMPERING AIR DAMPER 2+IVDOPCQI      0            DIESEL ROOM VEMBLATIQHI CO          AVXLIARY    587.00    CO EMER OSL GEN EMERGENCY IXESEL GENERATOR ROOM                                            RM VENllhllONEXHAUST FAN HVJX3X 1 TEMPER9IG AIR DAMPER AUXILIARY 0            DIESEL ROOM VENBLAllONI CD          AUXLIARY    587.00    CD EMER DSI. GEN EMERGENCY DIESEL GENERATOR ROOM                                            RM VEMllLABQNSUPPLY FAN HV43GS 1 TEMPER IMG AIR DAMPER 2+IVJIGSQAB  -  0            IXESEL ROOM VENTILABQNI AB                      595.00        9IMER PLANT EMERGENCY DIESEL GENERATOR ROOM                                        GROUNDS VENBthllON SUPPLY FAN HVJIGS-1 OUTSQE HR SHUTOFF DAMPER 0            DIESEL ROOM VEMBLAllQNI CO          ANQUARY    595 00    RCTR CABLE TVMM, EMERGENCY DIESEL GENERATOR ROOM                                          QUAD 2
                                        'ENTLABONSUPPLY FAN HV43GS 2 OUTSCE AIR SHUTOFF DAMPER 0  AVXLIARYBVLDINGVENBthllONI 4KV RM            ANQUARY    809.00    4KV RM 800V SWGR 500 VOI.T SWITCHG EAR XFORMERS TR21 A                                      AREA 5 TRZIC AREA VENT SUPPLY FAN HV-SGR$ 8 SUCBON DAMPER 0      AUXIUARYBULGING VENBthllQNI 4KV            AUXLIARY    500.00    4KV RM 800V SWGR ROOM 800V SWITCHGEAR TRANSFORMERS                                          AREA AREA VENBlhllONSUPPLY FAN HV~RS-7 SUCBOM DAMPER 2+IV~R4ID4      0  AUXIUHIYBULDWG VENBLATIONI 800VAC            AUXLIARY    813.00        4KV ROOM MOTOR CONIROL CENTER MEZZANQIE                                    MEZZANWEAREA AREA VENBLABQNSUPPLY FAN HV~RS-0 VENT DAMPER 12    24CM 111                RESQVAL HEAT REMOVALI RMR TQ        COMTHNMENT    59500    ANNULUS, QUAD NQ.
REACIDR COIXANTLOOPS 92 5 93 COLD                                            2 LEGS CONTHMMEMTISOLAllOMVALVE 24CM 120      0      RESDUAL HEAT REMOVALI REACTOR          CONTHNMENT    50500    ANNULUS, QUAD NO.
CXXANTLOOP 52 HOT LEG TO RESDUAL                                            2 HEAT REMOVALPUMPS SUCllON CONfHMMEMTISQLATlOMVALVE 0      BORON WJECBON I BORON INJECBQN            ANQUARY    812.00      BORON IMJ TANK TANKTRAN 'A'UTLETCONTHNMENT                                        OUTLET VLVRM ISOLATIONVALVE 24CM-251    0      BQRQtt NJECBQM I BORON IMJECBQN            ANQUARY    812.00      BORON NJ TANK TANKTRAIN%'UILETCOHTHNMENT                                        OUTLET VLVRM ISOLAllONVALVE
                                          , SAFEIY IMJECBON I NORTH SAFETY          AUXNJARY  587.00      N SAFEIY NJ PMP NJECBON PUMP PP.25M DISCHARGE                                            RM COMTHMMEMTISOLATIONVALVE SAFEIY INJECBQN I SOVIH SAFElY          AUXLIARY  587.00      S SAFElY NJ PMP 94JECBQN PUMP PP-25S DISCHARGE                                          RM CQMTAIIIMEMTISOLATION VALVE 0              RESQVAL HEAT REMOVALI              ANQUARY    501.00        VESBBVLE REIXRCILATlOMSUMP TO EAST RHRICTS PUMPS SUCBON CONTHMMEMTISOlhllON VALVE 0              RESOUAL HEAT REMOVALI              AVXLJARY                  VESBBVLE REC5ICUthBQM SUMP TO WEST RHRICTS PUMPS SUCBOM CONl'AINMENTISOLATIOH VALVE 24CMG11                    RESQVAL HEAT REMOVALI EAST          AVXLIARY              E RHR HEAT XCHGR RESOVAL HEAT REMOVALTO RC LOOPS 91                                            RM AND <<4 COLO LEGS CONTHNMENT BOLhllON VALVE 24CI4321      0    RESOUAL HEAT REMOVALI WEST RHR TQ            AUXLIARY    809.00    W RHR HEAT XCHGR REAGTQR cooLANT Loops <<2 AND tr3                                          RM COLD LEGS CONTAINMENTISmhllON VALVE 24MQ.128      0      RESDUAL HEAT REMOVALI REACTOR            CQNTHMMENT  817.00    LOWER CONT, QVAO CQIXANTLOOP <<2 HQT LEG TO RESIDUAL                                          NO. 2 HEAT REMOVALPUMPS SUCBON SHUTOFF VALVE 24MQ210                      CONTHMMEMTSPRAY I EAST            AVIARY                E CONT SPRAY PMP COMTHNMEMTSPRAY PUMP PPJIE 10 ln                                            RM MOTOR OPERATED DISCHARGE SHUTOFF VALVE
 
1II96 12:41 PM                DONALDC. COOK NUCLEAR PLANT UNIT 2                &#xb9;                        Page &#xb9;16 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN BhWI      T~
Q                  24JQ.211 24AQ-212 0
MOTOR OPERATED QSCHARGE VALVE
                                                                ~
CONTA!NMEMfSPRAY I EAST CONTANMENTSPRAY PUMP PP4E 10 In COMTANMEMTSPRAY I EAST CONTANMENTSPRAY PV MP PP46 2 In AUXIUARY AUXIUARY 573.00 573.00 E CONT SPRAY PMP RM 6 CONI'PRAY PMP RM MOTOR OPERATED QSCHARGE TO COMTANMEMTSPRAY ADOIllVEEDUCTOR SHUTOFF VALVE 2JMQ-21 5  0  COMl'ANMENTSPRAY I REFVEUHG WATER              AUXIUARY  573.00  6CONTSPRAYPMP STORAGE TANKTO EAST CONTANMENT                                        RM SPRAY PUMP PP4E SUCTKN 12 In MOTOR OPERATED SHUTOFF VALVE 0          CONTANMENTSPRAY I WEST                ALQOUARY  573.00 W CONT SPRAY PMP
                                  ~ COMI'ANMENTSPRAY PVMP PP4W 10 In                                        RM MOTOR OPERATED QSCHARGE SHUTOFF VALVE COMTANMEHTSPRAY I WEST                AUXIUARY  573.00 W CONT SPRAY PMP COMTAINMEMfSPRAY PUMP PP4W                                          RM QSCHARGE SHUTOFF 10 In MOTOR OPERATED VALVE COMTANMENTSPRAY I WEST                AUXIUARY  573.00 W CONT SPRAY PMP COMI'ANMENTSPRAY PUMP PP4W                                          RM QSCHARGE TO CONTANMEMTSPRAY ADQTlVEEDUCTCR 2 In MOTOR OPERAlED SHUTOFF VALVE 0  CQHTANMENTSPRAY I REFVEUNG WATER              AUXIUARY  573.00 W CONT SPRAY PMP STORAGE TANKTO WESf CONTANMEMT                                          RM SPRAY PUMP PP4W SVCOON 12 ln MOTOR OPERATED SHUTOFF VALVE BORON NJ ECAQN I BORON NJ ECIIQN            AUXNJARY  112,00 BORONNJTANKRM TANKTRNN 'A'NlETSHUTOFF VALVE BORON NJECllQH I BORON NJECTIOH            AUXIUARY  112.00 BOROHNJTANKRM TANKTRAN'IfINLETSHUTOFF VALVE 12  2JMQ481    0        REFVEUNG WATER STORAGE TANK              AVXIUARY  587.00  S SAFElY NJ PMP SUPPLY I REFVEUNG WATER STORAGE                                        RM TANKTK43 SUPPLY TO SAFElY INJECTION PUMPS SHUTOFF VALVE REFUEUMG WATER STORAGE TANK              AUXRJARY  587.00  NSAFEIYNJPMP SUPPLY I SAFElY NJECTION PUMPS                                        RM REQRC TO REFUEUNG WATER STORAGE TANK7K43 lRAN'A'HUTOFF VALVE 0        REFVEUNG WATER STORAGE TANK                AVXLIARY  587.00  NSAFElYNJPMP SUPPLY I SAFEIY NJECIION PUMPS                                        RM RECRC TO REFUEUNG WATER SlDRAG6 TANKlX43 TRAN 'IfSHUTOFF VALVE 24JO470    0      SAFETY NJECItOH I SAFETY NJECTtON            AUXIUARY  587.00  NSAFETYNJPMP PUMPS QSCHARGE CRQSSllE TRAN                                          RM VALVE        'A'HUTOFF 24MO.275    0      SAFETY NJECTIONI SAFElY NJECTION            AUXIUARY  587.00  S SAFETY NJ PMP PUMPS QSCHARGE CItQSSTIE TRAIN      If                                RM SHUTOFF VALVE 24IIO410              RESDVAL HEAT REMOVALI EAST              AUXNJARY  573.00  EAST RHR PUMP RM RESDUAL HEAT REMOVALPUMP PP456 SUCnQN SHUTOFF VALVE 2480412                RESDUAL HEAT REMOVALI EAST              AUX8JARY  809.00  E RHR HEATXCHGR RESDUAL HEAT REMOVALHEAT                                          RM EXCHANGER HE.17E OVlLET    MEOW UNE SHUTOFF VALVE 8        2  24MQ414                RESDUAL HEAT REMOVALI EAST              AUXNJARY  809.00  E RHR HEAT XCHGR RESDUAL HEAT REMOVALPUMP PP45E                                          RM QSCHARGE CRQSSTIE SHUTOFF VALVE 8        2  24JQ415    0    RESDUAL HEAT REMOVALI EAST RHR ANO            CONTANMENT  112,00    E CONT LOWER NORlH SAFElY NJECHON TO REAClDR                                      VENT RM COOLANT LOOPS &#xb9;1 hat &#xb9;4 HOT LEGS SHUTOFF VALVE 24JO411    0    RESOUAL HEAT REMOVALI EASI'RHR ANO            CONTANMENT  112.00    6 CONT LOWER NORTH SAFElY NJECDQN TO REACTOR                                      VENT RM COOLANT LOOPS &#xb9;1 AND &#xb9;4 COLO LEGS SHUTOFF VALVE RESDUAL HEAT REMOVALI WEST                AUXIUARY  573.00    W RHR PMP RM RESDUAL HEAT REMOVALPUMP PP45W SUCTION SHUTOFF VALVE 0          RESCUAL HEAT REMOVALI WEST              AVXIUARY  809.00  W RHR HEAT XCHGR
                                  ~ER  RESDVAL HEAT REMOVALHEAT HE-1 7W OVtLET MQ&#xb9;FLOW UNE SHUTOFF VALVE RM 24AO424    0        RESOUAL HEAT REMOVALI WEST                AUXIUARY  809.00  WRHRHEATXCHGR RESDUAL HEAT REMOVALPUMP PP45W                                          RM QSCHARGE CROSSTIE SHVfOFF VALVE 0      RESDVAL HEAT REMOVALI WEST RHR              CONTANMENT  11200    W CONT LOWER AND SOUTH SAFElY NJECDON TO                                        VENT RM REACTOR COOLANT LOOPS &#xb9;2 AMD &#xb9;3 HOT LEGS SHUTOFF VALVE 2JMQ428    0      RESOVAL HEAT REMOVALI WEST RHR              COMI'ANMEHT 112.00    W CONT LOWER AND SOVIH SAFETY NJECllON TO                                      VENT RM REACTOR COOLAMfLOOPS &#xb9;2 ANO &#xb9;3 COLD LEGS SHUTOFF VALVE 0          RESDUAL HEAT REMOVALI EAST              AUXIUARY  809.00  E RHR HEAT XCHGR RESDUAL HEAl'EMOVALTO UPPER                                            RM CONTANMENTSPRAY SHUTOFF VALVE
 
1/BI96 12:41 PM                  DONALDC. COOK NUCLEAR PLANT UNIT 2            &#xb9;                          Page  <<17 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN Equip      Train                                                              Braiding Boor Elev    Room or Row Col 0          1    24MO331    0    REmIALHEAT REMOVALI WEST RHR TO          AUXIUARY    009.00  WRHRHEATXCHGR UPPER COMTAWMEMfSPRAY SHUTOFF                                      RM VALVE 12                            RESQUAL HEAT REMOVALI EAST        AUXIIJARY            E RHR HEAT XCHGR RESDUAL HEAT REMOVALHEAT                                        RM EXCHANGER TO CHARGWG PUMPS SUCAOM SHVfOFF VALVE 12                        RESOUAL IKhfREMOVALI WEST RHR        AUXIIJARY  009.00  WRHRHEATXCHGR HEAT EXCHANGER OUTLET TO SAFElY                                    RM WJECAQN PUMP SUCAQM SHUTOFF VALVE 12                0      SAFHY WJECAON I SAFHY WJECAON          AUXILIARY  587.00      W CENTRIFUGAL PUMPS TO CVCS CHARGING PUMPS                                CHARD PMP RM SUCAON HEADER CROSSAE SHUTOFF VALVE 0    -SAFHY WJECAON I SAFHY WJECAON          ALBGLIARY  587.00    N SAFETY WJ PMP PUMPS SUCAQN TD AND FROM CHARGING                                    RM PUMPS SUCAQM TRAN 'A'HUTOFF VALVE SAFHY WJECAQN I SAFHY WJECAQN          AUXXJARY  587.00    NSAFETYWJPMP PUMPS SUCAQN TD ANO FROM CHARGWG                                      RM PUMPS SUCAQN TRAN 'P SHUTOFF VALVE 12                0      RESOUAL HEAT REMOVALI REFUEUNG      . AUXIUARY  591.00        VESABULE WATER STDRIIGETAHKTXG3TO RESDUAL HEAT REMOVALPUMPS SUCAON SHUTOFF VALVE 24MO81    0    BORON WJECAQNI BORON WJECAON TO      COMl'AWMENT  598.00  ANNULUS, QUAD NO.
REACTOR COOLANT LOOP &#xb9;1 SHUTOFF                                      1 VALVE
                                                  ~
BORON WJECAOM I BORON WJECAON TO      CONTAINMENT  59IL00  ANNULUS, QUAD NQ.
REACTOR CIXXAMTLOOP &#xb9;2 SHUTOFF                                      2 VALVE BORON WJECAQN I BORON WJECAQN TO      CONTAWMENT    SWL00    ANNULUS, QUAD NO.
REACTOR          LOOP &#xb9;3 SHUTOFF                                    3 VALVE 0      BORON lSKCiXNI BORON WJECAON TO      CONTAWMENT    58L00    ANNULUS, QUAD NO.
REACTOR COOUWT LOOP &#xb9;4 SHUTOFF                                      4 VALVE 24MQ4410              REFUELWG WAlER STORAGE TANK          AUXIIJARY  587.00      RECIPROCATWG SUPPLY I REFUEUNG WATER STORAGE                              CHARD PMP RM TANKTO CVCS CHARGWG PUMPS SUCAON HEADER IRAN<<h<<SHUTOFF VALVE 24MO4411  0          REFUELWG WhlER STORAGE TANK          AUXIUARY  587.00      E CENTRIFUGAL I
SUPPLY REFUEDNG WAlER STORAGE                              CHARG PMP ROOM TANKTO CVCS CHARGWG PUMPS SUCAOM HEADER lRAW'P SHUTOFF VALVE 0    IXESEL LUBE QLIAB EMERGENCY DIESEL        AUXILIARY  587.00    AB EMER DSL GEN UPPER VALVEGEAR LUBRICAllON                                      RM CONTROL SOLENOID &#xb9;1 2450.241        IXESEL LUBE 4XL/AB EMERGENCY DIESEL      AUXIUARY  587.00    AB EMER DSL GEN UPPER VALVEGEAR LUBIUCATIOM                                      RM CONTROL SOLENOID &#xb9;2 TXESEL LUBE IXLI CD EMER IXESEL GEN    AUXILIARY  587.00    CD EMER OSL GEM UPPER VALYEGEAR LUBRCAAQN                                        RM CQMIROL SOLENOID &#xb9;1 2450  240 0      IXESEL UIBEOLICD EMER IXESEL GEM      AUXILIARY  587.00    CDEMERDSLGEN UPPER VALVEGEAR LUBRCAAON                                        RM CONTROL SOLENOID &#xb9;2 24ICM421            MAWSTEAM I MAWSTEAM LEAD &#xb9;2 TO        AUXIUARY    033.00    W MN STM STOP AIAGLIARYFEED PUMP TURBWE 4 W                                    ENCL MOTOR OPERATED SHUTOFF VALVE 24lCM.231                        I MAW STEAM MAINSKAM LEAD &#xb9;3 TO        AUXIIJARY  033.00    W MN STM STOP AtA0LIARYFEED PUMP TURBWE 4 W                                    ENCL 2~0                    MOTOR OPERATED SHUTOFF VALVE I
MAW STEAM SKAMSTOP VALVEMRV.210 STEAM CYUNOER DUMP 4 W MOTOR AUXIUARY    033.00    E MAW STM STOP ENCL OPERATED VALVES SELECfOR VAI.VE 0                  I MAINSIEAM STEAM STOP VALVEMRV-220        AUXILIARY  033.00    W MM STM STOP STEAM CTLWQER DUMP 4 W MOTOR                                      ENCL OPERATED VALVESSELECTOR VALVE 0                  I MAWSTEAM STEAM STOP VALVEMRV-230          AUXIUARY    033.00    W MN STM STOP SKAMCYUNOER DUMP VALVES 4 W                                      ENCL MOTOR OPERATED SELECTOR VALVE 24<<0<<10.240                    I MAWSTEAM STEAM STOP VALVEMRY 240          AUXlLIARY  033.00    E MAIMSIN STOP STEAM CYUt&#xb9;3ER DUMP VALVE4 IM MOTOR                                    ENCL OPERATED SELECTOR VALVE 244MO 151  0        PRESSUIAZERI PRESSURIZER REUEF      CONTAINMENT  050.00  PRESSURIZER EHC4 VALVENRV.151 UPSTREAM 3 W MOTOR                                  WKRIOR OPERATED SHUTOFF VALVE 244MO 152  0        PRESSUIAZERI PRESSURIZER REUEF      CONTAWMENT    050.00  PRESSURIZER EIK2 VALVENRV 152 UPSTREAM 3 W MOTOR                                  WTERIOR OPERATED SHUTOFF VALVE 244MQ-1 53  0        PI4ESSURIZERI PRESSURIZER REUEF    CONTAWMEMT    05IL00  PRESSURIZER ENCL VALVEHRV.1 53 UPSTREAM 3 W MOTOR                                  WTERIOR OPERATED SHUTOFF VALVE REACTOR COOLANT SYSTEM VENTS I    CONTAWMENT  021.00    RClR VESSEL HEAD REACTOR VESSEL OME.1 POSTWCCIQEMT                                    AREA VENT TRAN 'h'OLENOID VALVE REACTOR COOLANT SYSTEM VENTS I    CONTAINMENT  021.00    RCTR VESSEL HEAD REACTOR VESSEL OMEH POST~42OEN VENT TRAN 'A'OLENOID VALVE f                              AREA
 
1NI96 12:41 PM                      DONALD C. COOK NUCLEAR PLANT UNIT 0 2                                                                                                  Page f) 18 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN Equip      Train                                                System        I Equipment Descri ption Ches 8          1                  0          REACTOR CmXANT SYSTEM VENTS I                                                            CONTAOIMENT      621.00  RCTR VESSEL HEAD REACTOR VESSEL OME-1 POSTWCCDENf                                                                                                  AREA VENT TRNN                  If SOLENOlO VALVE 6          1        24ISQ 24  0          REACTOR COOLANT SYSTEM VENTS I                                                            COMTANMENT      621.00  RCTR VESSEL HEAD REACTOR VESSEL OME.1 POST%(XXDENT                                                                                                  AREA VENTTRAIN SOLENOlD VALVE  'ff 24ISQ81    0          REACfQRCQOLANTSYSTEM VENTSI                                                              CONTANMENT      650.00    PRESSURIZER ENCL PRESSURIZER OMEQ POST AC(XDENT                                                                                              NTERIOR VENT TRAN 'A'OLENOID VALVE 0          REACTOR COOLANT SYSTEM VENTS I                                                            COMTANMENT      650.00    PRESSURIZER ENC(
PRESSURIZER OMEP POSTBAG(3DENT VENI'RAIN'A'OLENOIDVALVE 0          REACTOR CQOLAtP SYSTEM VENTS I PRESSURIZER OMEQ POSTWCCIOEMT VENfTRAIN%'OLENOID VALVE 0          REACTOR CrXXANTSYSTEM VENTS I PRESSURIZER OMER POSTACCDEMT VENT TRNN 17 SQLENOlD VALVE 0    REACiDR COQ(ANT PUMP SEAL WAlER                                                                CONTAINMENT    508.00    ANNULUS, QUAD NO.
SUILEAKOFFI REACTOR COOLANT PUMP SEAL WAlER RETURN TRAN ISOLATION4 0( MOTOR          'A'ONTAOIMEMT OPERATED VALVE REACIDR COOLANT PUMP SEAL WATER                                                                  AUIOUARY      501.00
                                      ~ UrLEAKOFFI REACTOR COOLANT PUMP SEAL WATER RE)URN TRAOI 'If COMTASIMENTIS(XATIOM4 IN MOTOR OPERATED VALVE 0    CHARGSIQ (CVCS) I CVCS CHARGING TO                                                                AUIOUARY      SS7.00      RECIPROCAllNG REGENERATIVE HEAT EXCHANGER TRAN                                                                                            CHARQ PMP RM
                                                                            'A'HUTOFF VALVE 243MQ-201  0    CHARGNQ (CVCS) I CVCS CHARGING TO                                                                  AUXIUARY  ,  SS7.00      RE(XPROCATSIG REGENERAllVE HEAT EXCHANGER IRAN                                                                                            CHARQ PMP RM
                                                                            %'HUTOFF VALVE 243MO.225,  0    CHARGOIG (CVCS) I WEST GEM IRIFUGAL                                                                AU)QUART      587.00  WEST CENTRIFUGAL CHARGING PUMP MSOFLOW TO RCP SEAL                                                                                          CHARG PMP ROOM WATER HEAT EXCHANGER HE.11 2 N MOTOR OPERATED SHUTOFF VALVE 0    CHARGNQ (CVCS) I WEST CENTRIFUGAL                                                                  AUXIUARY      SS7.00    W CENlRlFUQAL CHARGING PUMP M08R.OW TO RCP SEAL                                                                                            CHARD PMP RM WATER HEAT EXCHANGER HE 11 2 IN MOTOR OPERAlED SHUTOFF VALVE 12                  0      BORON MAKEUP (CVCS) I EMERGENCY                                                                  AUXIUARY      587.00    BORIC ACID STOR BORATION TO CVCS CHARGING PUMPS                                                                                              TANKAREA SUCllQN HEADER SHUTOFF VALVE 2CNO451    0      LETDOWN (CVCS) I REACTOR COOLANT                                                                AUIOUARY      609.00  . VQL CTRL TANKE LE)DOWN VOLUMECONTROL TANKTK 10                                                                                                  HALLWAY TO CVCS CHARGSIG PUMPS TRAN 4 IN MOTOR OPERATED VALVE                        'A'HUTOFF 0    LETDOWN (CVCS) I REACTOR COOLANT                                                                  AUXLJARY      609.00    VOL CTRL TANKE lElDONNVOLUMECONTROL TANKTK 10                                                                                                    HALLWAY TO CVCS CHARGSIG PUMPS TRAIN'If SHUTOFF 4 OI MOTOR OPERAlED VALVE 12                      . MiuN STEAM I TURBINE DRIVEN AUXFEED                                                                TURBINE      501.00      TB DRIVEN AUX PUMP PPX TRIP AND THROTTLE VALVE                                                                                              FOWTR PMP 0            ESSENTIAL SERVICE WATER I EAST                                                            SCREENHOUSE    501.00  E ESSNTL SERV WTR ESSENTIAL SERVICE WATER PUMP PP.TE                                                                                                PMP RM (XSCHARGE SHUTOFF VALVE 6,                2.WMO-704  0          ESSENIIAL SERVICE WATER I WEST                                                              SCREENHOUSE    591.00      W ESSNTL SERV ESSENTIAL SERVICE WATER PUMP PP-7W                                                                                            WTR PMP RM DISCHARGE SHUTOFF VALVE 2-WMO.TOS  0          ESSENTIAL SERVICEWATER/WEST                                                                    TURSNE      560.00    ESSMIL SERV WTR ESSENllAL SERVICE WATER SUPPLY                                                                                                PIPE TUNM i%ADER CROSSTIE TO UNIT 1 SHUTOFF VALVE 0          ESSENTIAL SERVICE WATER I EASf                                                                TURBINE      560.00    ESSNTL SERV WTR ESSENIIAL SERVICE WATER SUPPLY                                                                                                PIPE TUNN lKhOER CROSSDE TO UNIT 1 SHUTOFF VALVE 2-WMQ.712  0          ESSENIIAL SERVICE WATER I EAST                                                                              633.00        633 HALLWAY CQNTASIMENTSPRAY HEAT EXCHANGER l% 18E EBS ENllALSERVICE WATER OILET SHUTOFF VALVE 2.WMQ 714  0          ESSENTiAL SERVICE WATER I EAST                                                                AUXIUARY      609.00        609 HALLWAY CQNTAOIMENTSPRAY HEAT EXCHANGER HE-18E ESSENRAL SERVICE WATER OUTLET SHUTOFF VALVE 2-WMQ.716  0        ESSENIIALSERVICEWATERIWESI'CNI'AIN                                                              AUXIUARY      633.00      833 HALLWAY MENT SPRAY HEAT EXCHANGER ESSENTIAL SERVICE WATER INLET SHUTOFF VALVE 1      2.WMQ-71 8  0        ESSEMRAL SERVICE WATER I WEST                                                                  AU)OUARY      600.00      800 HALLWAY CONTAOIMENTSPRAY HEAT EXCHANGER ESSENllAL SERVICE WATER OUTLET SHUTOFF VALVE 2.WMO.722*0  0        ESSENTIAL SERVICE WATER I                                                                      AUXIUARY      587.00  2CD DSL RM N PIPE SERVICE WATER SUPPLYWESI'SSENTIAL TUNNEL fKAOER TO AB EMERGENCY DIESEL HEAT EXCHANGERS SHUTOFF VALVE
 
1/8/96 12:41 PM                      DONALD C. COOK NUCLEAR PLANT UNIT02                                                  Page  I/19 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN Equip      Tisln                            System I Erluipmeni esonpbon                    Bw'kiin0 Fkor Bev    Room or Row Col 8          2    2.WMO 724AB  0      ESSENIIAL SERVICE WATER I EAST                  AUXIUARY    587.00  2CO DSL RM N PIPE ESSEMIIAL SERVICE WATER SUPPLY                                                TUNNEL HEADER TO AB EMERGENCY IXESEL HEAT EXCHANGERS SHUTOFF VALVE 2-WMO 728CO    0      ESSENlAL SERVICE WATER EAST  I                  AUXIUARY    587.00  2CO DSL RM N PIPE ESSEMIIAL SERVICE WATER SUPPLY                                                TUNNEL HEADER TO CD EMERGENCY DIESEL HEAT              I EXCHANGERS SHUTOFF VALVE 2-WMO 728CO    0      ESSEMIIAL SERVICE WATER I WEST                  AUXIUARY    587.00  2CO DSL RM N PiPE ESSENIIAL SERVICE WATER SUPPLY                                                TUNNEL HEADER TO CD EMERGENCY OESEL HEAT EXCHANGER S SHUTOFF VALVE 2-WMO 732  0      ESSENTIAL SERVICE WATER I EAST                  AUXLIARY    800.00      809 HALLWAY COMPONENT COOUNG WATER HEAT EXCHANGER HE.15E ESSEMIIAL SERVICE WATER NLET SHUTOFF VALVE 2.WMO.734  0      ESSENTIAL SERVICE WATER EASf I                  AVXLAARY    800.00      809 HALLWAY COMPONENT COOUNQ WATER HEAT EXCHANGER HE 15E ESSEMIIALSERVICE WATER OUILET SHUTOFF VALVE 2-WMO 738  0      ESSENTIAL SERVICE WAlER I WEST                    AUXIUARY    809.00      809 HALLWAY COMPCNENT COOUNQ WA1ER HEAT EXCHANGER ESSENTIAL SERVICE WATER NLET SHUTOFF VALVE 2-WMO 738    0      ESSENTIAL SERVICE WATER/WEST                    AUXLIARY    800.00      809 HALLWAY COMPONENT COOUNQ WATER HEAT EXCHANGER ESSENTIAL SERVICE WATER OUTLET SHUTOFF VALVE 2-WMO.744    0  AUXLIARYFEED WATER SYSTEM I ESW TO                    TVRSHE    501.00    W MTR DRIVEN AUX WEST MOTOR DRIV AUXFEED PUMP PP4W                                              FDWlR PMP SHUTOFF 4 IN MOTOR OPERATED VALVE 12      2-WMQ.753        AUXLIARYFEED WATER I ESW TO TURB                    TURBNE    501.00      TB DRIVEN AVX DRafEM AUX FEED PUMP PP4 SHUTOFF 8                                            FDWTR PMP N MOTOR OPERATED VALVE 2.WMO 754  0                                  I ESSENIIAL SERVICE WATER ESSENTIAL                  TURBNE      591.00    E MTR DRIV AUX SERVICE WATER TO EASf MOTOR DRIVEN                                          FEEDVflR PMP AUXLIARYFEED PUMP PP46 4 N MOTOR OPERATED SHUTOFF VALVE 12                  0      CQMIRQLAXlI PRESSURIZER TRAIN      'ff PRESSURE REUEF VALVEMRV-1 52 CQMTRQL SOLENOID 24CSO407          CQNIRQL AXT I PRESSURIZER TRAN                  CONTANMENT    85ILOO  PRESSURIZER ENCL REUEF VALVENRV 153    'A'RESSURE NTERIOR CONTROL SOLENOID 124IV~.1          SCREENHQUSE VENILATIQNI UIOT 2 EAST                SCREENHQUSE    591AO    E ESSNTL SERV WIR ESSEMIIAL SERVICE WAlER PUMP ROOM                                                PMP RM SUPPLY VEMILATIONFAN 124IV~4      0  SCREENHQVSE VENTLATIONI UNIT 2 EAST                SCREENHOUSE    501AXI  E ESSNTL SERV WIR ESSENIIAL SERVICE WATER PUMP ROOM                                              PMP RM SUPPLY VENILATlONFAN 12+IV~A      0  SCilEENHOUSE VENILABONI UNIT 2 WEST                SCREENHOUSE    501.00    W ESSMTL SERV ESSEMIIAL SERVICE WATER PUMP ROOM                                            WTR PMP RM SUPPLY VEMILATIONCAN 124IV~Q      0  SCREENHQUSE VEMIXATKNI UNIT2 WEST                  SCREENHOUSE    591.00    W ESSMTL SERV ESSENTIAL SERVICE WATER PUMP ROOM                                            WTR PMP RM SUPPLY VENTLhllONCAN 24IV~1      0      AUXLIARYBUILDNG VENTLATIQNI                      AUXIUARY    83LOO    NORM SLOWDOWN AUXLIARYBVLDNQVEMILATION                                                FLASHTARK RM ENGNEERED SAFElY FEATURE EXHAUST UNIT 1 0        AUXLIARYBVLDNGVENILATIQN        I              AVXIUARY    03XOO    NORM BLOWQQWN AlmARYBVLDNGVENILATION                                                  FLASHTANKRM ENGNEERED SAFElY FEAlURE EXHAUST 24IV~P4XIE-1  0    AUXLIARYBVLDNGVENILATX3NI TRAIN                    AUXIUARY    833,00    NORM BLOWDQWN
                                          %'ATTERY ROOM EAST EXHAUST FAM                                            FLASHTANKRM 24IV~P4XlE.2  0    AUXLJARYBULDNG VENILATIQNI TRAN                    AUXLIARY    833.00    NORM SLOWDOWN
                                        'V BATTERYROOM WEST EXHAUST FAN                                            FlhSHTANK RM AUXILIARY 24IV~P441          TVRSNE BULDNQ VENTLATIONI EAST                      TURBNE    591.00      E MTR DRIV AUX MOTOR DRIVEN AVXLIARYFEEDWATER                                              FEEDWTR PMP PUMP ROOM EXHAUSf FAN 2+IV~P442    0      TURSNE BVLDNGVEMILATIQNI EAST                      TURBINE                E MTR ORIV AUX MOTCR DRIVEN AVXLIARYFEEDWATER                                            FEEOWTR PMP PUMP ROOM SUPPLY FAN 24IV4FP-T1  0    TURBNE BVXDNGVENlllhllQNI TURBINE                    TURBNE      501.00      TB DRIVEN AUX DRIVEN AUXIUARYFEED PUMP ROOM                                              FOWTR PMP NORTH EXHAUSfFAN 2+IV.AFP.T2      TVRSNE BUIuXNQ VENTLATIONI TURBINE                  TURBINE    501.00      TB DRIVEN AVX DRIVEN            FEED PUMP ROOM                                          FDWIR PMP SQUIH EXHAUST'AN 24IV-ACE(1  0    TVRBNE BItuXNG VENILATIQNI WEST                    TURBINE    591.00    W MTR DRIVEN AUX MOTOR DRIVEN AUXILIARYFEED PUMP                                              FDWIR PMP i  9                  24IV~P.XZ 2+IV~0 1 0
ROOM EAST EXHAUSfFAN TURSNE 8VLDING VEMILATIONI WEST MOTOR DRIVEN AUXILIARYFEED PUMP ROOM WEST EXHAUSTFAN HYDROGEN SKIMMERI CONTANMENT lURBNE CONTANMEMT 591.00 825.00 TB 501 ELEV BASMNT HV~O-1 FAN RM HYDROGEN SKNMER VEMILA1lQNFAN 01 240f~Q 2    0      HYDROGEN SKIMMERI CONTANMEMT                    CQNTANMENT    825.00    HV~Q-2 FAN RM HYDROGEN SOMM ER VENTLATKNFAN n2
 
1/886 12:41 PM                      DONALD C. COOK NUCLEAR PLANT UNIT 2    &#xb9;                          Page  &#xb9; 20 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN Equipment IO  Rev                                        Buikiing Boor Bee    Room or Row Col No 0        IXESEL ROOM VENTRABOHI CO      AUXIUARY    587.00  CDEMERDSLGEN EMERGENCY DIESEL GENERATOR ROOM                                  RM VENBIABOHSUPPLY FAN 24IV49GS.Z      0        IXESEL ROOM VENBLABQHI AB      AUXLJARY    587.00  AB EMER DSL GEN EMERGENCY IXESEL GENERATOR ROOM                                  RM VENAIABQHSUPPLY FAN 0                                I CXESEL ROOM VENBLATION AB      AUXIUARY    587.00  AB EMER DSL GEN EMERGENCY IXESEL GENERATOR ROOM                                  RM CABNET VEMBIABOMSUPPLY FAN 0        IXESEL ROOM VENBLABONI CD      AVXIUARY  587.00    CO EMER DSL GEN EMERGENCY DIESEL GENERATOR ROOM CABINETVENBLABQNSUPPLY FAN 24IV4IQX 1      0                                I IXESEL ROOM VEMBLATIOH CD      AUXIUARY  587.00    CDEMEROSLGEN EMERGENCY DIESEL GENERATOR ROOM                                  RM VENBlATKWEXHAUSl'AN 24IV~2          0        IXESEL ROOM VEMBLATIONI AB      AUXIUARY  587.00    AB EMER DSL GEN EMERGENCY TXESEL GENERATOR ROOM                                  RM VENIXABQNEXHAUST FAM 24IV~S 1A        0      AUXTJARYBVOJXNG VENTILABON  I  AIDQUARY  609.00  4KV RM  OOQV SWGR CONTROL RQO DRIVE EQUIPMENT ROOM                              AREA ANO NVERTER AREA VENBLABQNNORTH SUPPLY FAN 0      AUXUARYBVILDNQVEMBLABQH/4CV        ANQUARY    609.00    40/ RM  AB 4KV ROOM AB 4CV SWITCHGEAR AREA                              SWGR AREA VENBLABOHSUPPLY FAN 24IV~SG        0      AUXLIARYBVuXHG VEMBLABOH/4KV      AUXRJARY  609.00    4KV RM CD 4KV ROOM CD 4CV SWITCHGEAR AREA                              SWGR AREA VENlllABONSUPPLY FAN 0      AUXNJARYBLRLONG VEHBLABONI        AUXIUARY  609.00  4KV RM OOOV SWGR CONTROL ROO DRIVE EQIXPMENT ROOM                              AREA ANO NVERTER AREA VEMBLA11ONSOUTH SUPPLY FAN 24IV~RS.T      0    AIYXJARYBUuXNG VEMBLABONI 4KV      AUXIUARY  609.00  4CV RM 600V SWGR ROOM 600 VOLTSWITCHGEAR                                  AREA TRANSFORMERS TRZI B AND TR21 0 AREA VENBLATIQHSUPPLY FAH 0    AUXLIARYBVUXNQVENTILABQHI 4KV      AUXILIARY  609.00  4KV RM NOV SWGR ROOM 600 VOLT SWITCHG EAR                                AREA TRANSFORMERS TRZIA ANO TR21 C AREA VEMBIATIONSUPPLY FAN AVXUARYBVIUXNQVEMBLABONI 600VAC      AUXIUARY  613.00      4KV ROOM MOTOR CONTROL CENTER MEZZANNE                            MEZZANNEAREA AREA VENBlhllONSUPPLY FAN 24IV~RX-2            AUX8JARYBVuXNQ VEMTKABQNI 4KV      AUXIUARY    609.00    4KV RM AB 4KV ROOM AB 4KV SWITCHGEAR AREA                              SWGR AREA VEIAllhBONEXHAUST FAN 0    ALQQUARYBUuXNQ VENTllh1lQNI 4KV    AUXIUARY    OXI.OQ    4KV RM CO 4KV ROOM CD 4KV SWITCHGEAR AREA                              SWGR AREA VENT8ABON EXHAUST FAN 0      AUXIUARYBVuXNG VENBLATIQNI AB    AUXIUARY    609.00    AB BATTERY EQIAP BATTERY EQUIPMENT AREA BATTERY                                AREA ROOM VEMBLABONEXHAUST FAN AUX8JARY BUUXNG VENBIhllONI CD    AUXNJARY    628.00  CD BATIERYEQUIP BATlERYEQUIPMENT AREA BATTERY                                AREA ROOM VEMIllhTlOHEXHAUST FAN 10            24IV&CRA-1      0    CONTROL ROOM VEHBLABQHI COMIROI. AUXIUARY    650.00  CTRL RM HR CONOIT ROOM VEMBIABOMNORTH HR                                      RM CQNOAIONNQ UNIT 10              24IV.ACRA.2          CONTROL ROOM VEHBLABONI CONTROL    AUXIUARY    65000  CTRL RM HR COHDIT ROOM VENBLA11ON SOUTH AIR                                  RM CONMlONNQ UNT 10            24IV-AES I (FLl) 0        AUIQUARYBULDINGVENBLATIQNI      AUXIUARY  683.00    NORM SLOWDOWN AUXXJARYBVLDNGVEMBlhTIOM                                FLASHl'ANKRM ENQWEERED SAFEIY FEATURE EXHAUST HR FlLTER 10            24IV~2 CFLT)    0        AUX8/ARYBUuXNG VEHBLABOH    I AIDOUARYBVKJXNG VENTlLATlQN ENGINEEREO SAFElY FEATURE EXHAUST AIR FILTER CQNlROL ROOM AIR CONOIBOHWQ CHILL    AVXOJARY  650.00  CTRL RM HR CONXT
                                          'ATER    I COHIROL ROOM AIR                                  RM COtlOAIONNQ NORTH UQVID CHILLERHV ACR-1 EVAPORATOR 24IE4I8S          CONTROL ROOM AIR CQNMlQHWG CHILL    AUXIUARY  650.00  CTRL RM AIR CONCXT WA1ER I COMlROL ROOM AIR                                    RM CONDmOHNQ SOUIH UQVID CHILLER HV-ACR-2 EVAPORATOR 24IE4HH            CONTROL ROOM AIR CON QAIONNQ CHILL  AVXIUARY  650.00  CTRL RMHR CQHDIT I
WATER COMIROL ROOM AIR                                      RM CONOmONIIQ NORTH UQUIO CHILLER HV.
ACR-I CONDENSER 2+IE4HS      0    CQNlROL ROOM HR CON OAIQHWQ CHILL    ANQUARY    650.00  CTRL RM AIR COHO/f WATER I COHTROL ROOM AIR                                    RM COHDAlQHWG SOUTH UQUID CNLLER HV.
ACR-2 CONDENSER 24IV&CR-1          CONTROL ROOM AIR CONOAIOHING CHILL  AUXIUARY  650.00  CTRL RM HR CQHOIT I
WATER CO/AROL ROOM HR                                      RM CQHQ/BONWG NORTH LKX/IOCHII.LER 24IV~.2        0    CONTROL ROOM HR CQHIXBOHINQ CHILL    AUXIUARY  650.00  CTRL RM AIR COHOIT WATER I CONTROL ROOM AIR                                  RM COHOAIOMNQ SOUTH LIQUIDCHILLER
 
1N/96 12:41 PM                        DONALD C. COOK NUCLEAR PLANT UNIT 2                    &#xb9;                          Page  &#xb9; 21 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN T                  Rw                                                                    Fktor aw
~  EqW 12        1 Equtpmont IO 2<T40248 No 0        DiESEL COMBUSTION NR I AB EMERGENCY Buddiny AVWUARY    587.00 Room or Row Cot AB EMER OSL GEN DIESEL lURBOCHARGER                                                RM 12        2  2&T4024XI      0      DEsa. CQMBVSBQH AIR I CO EMERGENCY                  AUXL/ARY  557.00  CD EMER DSL GEN DESEL TURBOCHARGER                                                RM 14        1                0        250 VDC QSTIIIBVBONI PLAMl'ATTERY BATTY DSCONNECf SWITCH 14                          0        250 VDC QSBIIBUBQN I PLANT BATTERY                AVXLIARY  828.00      CO BATTERY BATT~ DSCONNECT SWITCH                                        EOVIPMEMTAREA 14        2                  0        120208V MISC SAFETY RELATED POWER                AUXIUARY  587.00  CO EMER DSL GEN DSTRIBVBOMI POWER PANEl                                                RM 14        2                  0        120208V MISC SAFETY RELATED POWER                AUXIUARY  587.00  CO EMER OSL. GEN QSTRIBUBQH/120208 VACAUXLIARY                                              RM FEEDWATER IXSIRIBIfllONPANEL 14                            0          250VOC QSTRIBUBON I PLANT BATTERY                AUXL/ARY  809.00    CRIB NVE/TTER r BATTYAMMETER SHUNT                                                AREA 14        2  24VITT~        0          250VDC DSBBBVBQN I PLAMfBATTERY                  AUXNJARY  828.00  CO BAT1ERY EQUIP BATT~ AMMETER SHUMfCABNET                                                AREA 14        12  24IATT44SH      0      250VOC CONTROL ANO NSTRUMENTATIONI                  AUMUARY    CXL00        NORMAL METERNG SHUNT                                              BLOWDOWN FlASHTANC ROOM 14            24IQAB 'TH    0          250VDC QSBIIBUTIQHI PLANT BATTERY                AUXL/ARY  809.00    CIBO INVERTER CHARGER AMMETER BCAB SHUNT                                                AREA CABNET 14                            0 ~      250VDC DSTRIBUllONI PlANT BATTERY                                    CO BATTERY EQVtP CHARGER BCCO SHUNT CABNET                                                AREA 14                            0        250VDC DSTRIBUllONI PLANT BATTERY                AUXLIARY  d13.00        4KV ROOM CHARGERS BQABT ANO BQA82 TRANSFER                                        MEZZANtNEAREA SWITCH CABINEl' 14                                      250VOC QSBUBUBQH I PLANT BATTERY                  AVXIUARY  828.00  CO BATTERY EQUIP CHARGERS BCCO1 ANO BCCD2                                              AREA TRANSFER CABNET 14                          0          250VOC QSmtBVTION I 250VOC TRAN 'P                AUXIUARY  833.00    CONTROL ROOM CRITICALSOLENOID VALVESQSTRIBUBOM PANEL 14                          0        250VOC QSTRSVTIOH I 250VDC TRAN                    AUXLJARY  833.00    CONTROL ROOM SOLENDO VALVESQSBTIBUBON  'A'R/TICAL 14              2~          0 PANEL 250VDC QSIRIBUBQN I 250VOC CQHTROL ROOM DSIRIBUBOM PANEL CRAB AVXL/ARY  83%00      COMlROL ROOM 2~CO        0          250VDC DSTRIBUllONI POWER PANEL                  AUXIUARY  833.00    CONTROL ROOM 14                          0        120V CONTROL ROOM NSTRUMENTAllON                  AUXIUARY  833.00    CONTROl. ROOM QSTR I 120VAC CONTROL ROOM NSTRUMEN'STR!BUBON CHANNELI OISTRIBUBON PANEL 14                            0        120V AC DISTRIBUBOH I 120VAC CONTROL              AUXL/ARY  833 00    CONTROI. ROOM ROOM INSTRUMENT QSTRIBUBON CHANNEL 8 DISTRIBUTIONPANEL 14                            0        120V CONTROL ROOM INSlRVMENTATIQH                AVXIUARY  83300      CONTROL ROOM DISTR I 120VAC COMmOL ROOM INSTRUMENT QSTRIBVBON CHANNEL dl DSTRIBUBON PANEL 14                            0        120V CONTROL ROOM NSTRVMENTATIQN                  AUXIUARY  CQ.00      CONTROL ROOM DSTR /120VAC CONTROL ROOM NSTRUMENT QSTRIBVBON CHANNELIV DSTRIBUllOH PANEL 14        12                  0      250VOC CONTROL ANO NSTRUMENThllONI                  AUXLIARY  83%00      833 HALLWAY 250VDC POWER PANEL 14                            0        120208V MISC SAFEIY RELATED POWER                AUXNJARY  587.00  ABEMEROSLGEN DSTR I POWER PANEL                                                RM 14                            0        120208V MISC SAFElY RELATED POWER                AUXLIARY  587.00  ABEMEROSLGEN QSTRIBUTlON /120208VAC EMERGENCY                  AUXILIARY                  RM LOCALSHUTDOWN AVXL/ARY DSTRIBUllON PANEL 14              24ICAB      0                250VOC DISTRIBVBQN I 250VOC                AUXNJARY  809.00    AB BATTERY EQUIP DSTRIBUBOH PANEL MCAB                                                AREA 14        2    24ICCO                      250VDC DISTRIBUBON /250VDC                  AUXIUARY  828.00  CO BATTERY EQUIP DSTRIBUBON POWER PANEL                                                AREA 14        1    24ADAB      0          250VDC DSTRIBUBQH I 250 VOC POWER                AUXIUARY  809.00    AB BATTERY EQUIP PANEL                                                    AREA 14        2      24IOCO      0              250VOC QSTRIBUBON I 250VDC                            82L00    CO BATTERY EQUIP QSTRIBUBOM PANEl MOCD                                                AREA 14              2~%1        0    . 250VOC QSBltBVTQM/250VOC TRAN                                587.00  NUCLEAR SAMPUNG SAMPUNG FEEDER PANEL 91 2~~
                                                                              'A'UCLEAR RM 14        2                  0        250VDC OISIRIBVBQHI 250VDC NUCLEAR                  AVXIUARY  587.00  NUCLEAR SAMPUNG SAMPUNG FEEDER PANEL N2                                                RM 14                            0          250VDC DISTRIBUTIONI POWER PANEL                AVXIUARY  587.00  NUCLEAR SAMPUNG RM
  'l4    ~I  1                  0        250VOC QSTRIBUllON I 250 VDC POWER                AUXLJARY  009.00  AB BATTERY EQUIP PANEL                                                    AREA 14                            0          250VDC QSIRIBVBQH I POWER PANE!                  AUXLIARY  828.00  CO BATTERY EQUIP TRAN A TRANSFER CABINET                                              AREA 2-VOAB 1    0          250VDC QSTRIBVTIQN/250VDC VALVE                  AVWUARY  Cl3.00    CONTROL. ROOM DSTRIBlfllOMPANEL VOA8.1 2.VOA8-2    0          250VDC DSTRIBVBON I 250VDC VALVE                AUXIUARY  833.00    CONTROL ROOM DSTRIBUTIOM PANEL VOAB-2 2-VDCO.1    0          250VDC QSTRIBUBQN I 250VOC VALVE                AUXIUARY  833.00    CQHTRQI. ROOM DISTRIBVBQN PANEL VDCD.1 14        2                  0          250VDC DSTRIBUTIOMI250VDC VALVE                  AVXLIARY  833.00    CONTROL ROOM DISTRIBUTION PANEl VDCD 2
 
1/8/96 1241 PM                      DONALD C. COOK NUCLEAR PULNT UNIT 2        &#xb9;                              Page  &#xb9; 22 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR SEISMIC WALKDOWN EeWI      T~                                Syefeml Eqidpment Deeol peon    Building Floof Eiev      Room of Row Col Q                                  0  250VDC IXSIRIBVIIQNIPLANT BATTERY AB    AUXIUARY    SN.OO      AB BATTERY EQUIP AREA 15        2                      250VDC IXSTIOBUDQHI PLATT BATTERY CO    AUXIUARY    020.00    CD BATTERY EQUIP AREA 15        12                  0  250VDC CONTROL ANO INSTRUMENTATIQNI    AVXLJARY    033.00            NORMAL TRAN 'V PLANT BATTERY                                    BLOWDQWN FLASHTANKROOM 10        12                  0  250VDC CONTROL AND NSTRUMENTABONI      AUXNJARY    OX%00          033 HALLWAY BATTERYCHARGER A FOR N.TRAN BATTERY 10                24IQABI          250VDC DSTRSVRON I PLANT BATTERY      AUIOLIARY  013.00          4KV ROOM BATT%8 BATTERYCHARGER <<I                                MEZZANINEAREA 10                                  250VDC DLSIRIBVIIQHI PLAMI'ATTERY    AUXXJARY    013.00          4KV ROOM BATT~CHARGER <<2                                    MEZZANINEAREA 10        12                      250VDC CONTROL ANO NSIRVMEHTATIQNI      AVXIUARY,  033.00        033 HALlWAY BATTERYCHARGER B FOR N TRAN BATTERY le                24IQCDI    0    250VDC DLSIIOBUllONI PUWT BATTERY    AVXIUARY    020.00    CO BATTERY EQUIP BATTEDCHARGER <<I                                          AREA 10                24CCDZ            250VOC IXSIRSVlIONI PUWT BATTERY      AUXNJARY    020.00    CD BATTERY EQUIP BATTEDCHARGER <<2                                          AREA le                            0              12OVAC CONTROL ROOM          ALDOUARY    009.00      NVERTER AREA NSTRVMENTATlONIXSIRIBVllONSYSTEM I 120VAC CONTROL ROOM NSTRUMEMT DISTRIBVDQMSYSIEM CHANNEL I NVERTER 0    12OV CQHTRQLROQMNSIRVMENTATION        AVXIUARY  009.00        NVERTER AREA IXSIR I 120VAC CONTROL ROOM NSTRVMENTLXSIRIBVIIOMSYSTEM CHANNEL 0 INVERTER 10                                  120V CONTROL ROOM INSTRVMENTATIQN      AVXLIARY  009.00        NVERTER AREA TXSTR I 12OVAC CONTROL ROOM NSTRUMENTATIONIXSTRIBUTIOMSYSTEM CHANNEL14 NVERTER 24XTIOJVJNV  0    120V CONTROL ROOM NSTRVMENTATION      AUXIUARY  SN.OO        CONTROL ROOM IXSIR I 120VAC CONTROL ROOM NSTRUMENT CLSTRIBURON SYSTEM CHANNEl IV NVERTER le                                        LXESEL GENERATOR. CONTROL 6      AVXXJARY  587.00      AB EMER OSL GEN INSTRVMENTAllONI AB EMERGENCY                                        RM DIESEL GENERATOR OME.1 SLAB NVERTER 10                            0        DIESEL GENERATION, CONTROL 8      AVXLJARY  587.00      CDEMERDSLGEN NSTRUMENTATKNI CD EMERGENCY                                          RM IXESEL GENERATOR OME-150CD NVERTER 17              24XI4E-1 50AB            DIESEL GENERAllQN. CONTROL 6      AUXIUARY  587.00      AB EMER OSL GEN NSTRVMENTATIQHI AB EMERGENCY                                        RM IXESEL GENERATOR 17              24XJE.150CO    0        DIESEL GENERhllON, CONTROL*        AUXIUARY  587.00    CO EMER DSL GEN NSTRVMENTATIONI CD EMERGENCY                                        RM OESEL GENERATOR 18                24XJ 110    0  STEAM GENERATNQ I STEAM GENERATOR      CQNTANMENT  012.00      . ACCUMUlATOR OME4.1 WIDE RANGE LEVEL NOICATOR                                TAHK<<1 AREA TRANSMITTER 10                24KJ.120    0  STEAM GENERAllNQ I SIEAM GENERATOR    CONTANMENT  012.00        W CONT LOWER OME4 2 WIDE RANGE LEVEL NDICATOR                                    VENT RM TRANSMffTER 18                24XJ-130  0    STEAM GENERATINQ I STEAM GENERATOR    CQNTANMENT  eu.oo        ACCUMULATOR OME44 WIDE RANGE LEVEL NDICATOR                                  TANK&#xb9;3 AREA TRANSMfflER 10                  24RJ 140        STEAM GENERATNG I STEAM GENERATOR      CONTAINMENT 012.00        ACCUMULATOR OME44 WIDE RANGE LEVEL NOICATOR                                  TANK<<4 AREA TRANSMITTER 18                  24XI 113  0      CONDENSATE STORAGE TANKSUPPLY I      AUXIUARY  548.00    STORAGE TANKPIPE CONDENSATE STORAGE TANKTK42 LEVEL                                    TUNNEL NDICATQR TRANSMIITER 10                  24XJ.114  0      CONDENSATE STORAGE TANKSUPPLY I      AVXIUARY  540.00    StORAGE TANKPIPE COHDENSATE STORAGE TANKTK42 LEVEL                                    TUNNEL NOICATOR TRANSMITTER 18                2~12        0    LXESEL JACKET WhlER I AB EMERGENCY    AVIOLIARY  547.00      ABEMERDSLGEN IXESEL JACKET WATER PUMP QT.130-ABI                                    RM DISCHARGE PRESSURE SWIICH 14                2CP $ 414        DIESEL JACKET WATER I AB EMERGENCY    AVXIUARY  587.00      AB EMER DSL GEN TXESEL JACKET WAlER PUMP QT 130ABZ                                      RM OSCHARGE PRESSURE SWITCH 14        2      2CPS417    0    DIESEL JACKET WATER I CD EMERGENCY      AVXIUARY  587.00      CO EMER OSL GEN I                    TXESEL JACKET WATER PUMP QT.130CDI I                                                                                            RM I                          DISCHARGE PRESSURE SWITCH 18                2~19        0    IXESEL JACKET WATER I CD EMERGENCY DIESEL JACKET WATER PUMP QT-130CDZ AVIOLIARY  SS7.00      CO EMER OSL GEN RM IXSCHARGE PRESSURE SWfTCH 2~10        0      COMPONEMf COQUNQ WATER I EAST COMPONENT COOUNQ WATER PUMP PP.
AVXIUARY  SN.OO          ON HALLWAY 10E CISCHARGE PRESSURE SWITCH 0      COMPONENT COOLNG WATER I WEST        AVXIUARY  009.00          009 HALLWAY COMPONENT COOUNQ WATER PUMP PP 10W IXSCHARGE PRESSURE SWfTCH 14                2+Fi 210    0        AUXIUARYF EEDWATER I AVX9JARY      AVXLIARY  021.00      E MANSTM STOP FEEDWATER TO STEAM GENERATOR OME.                                      ENCL 3.1 FLOW INIXCATORTRANSMITTER
 
1/8/I 1281 PM                    DONALD C. COOK NUCLEAR PLANT UNIT 2                          &#xb9;                              Page &#xb9; 23 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR SEISMIC WALKDOWN Equip    Train                          System  I Equipment Descnpbon                      Buiirtiny Fkor Bev      Room or Row Col 10      2                          AVXLIARYFEEDWATER I AVXIUARY                          AVXLIARY    021.00      W MN STM STOP FEEDWATER TO STEAM GENERATOR OME-                          r                            ENCL 3.2 FLOW NDICATOR TRANSMfflER 10                        0      AVXIUARYFEEDWAlER I AUXLIARY                          AVXIUARY    021.00      W MN STM STOP FEEDWATER TO STEAM GENERATOR OME.                                                        ENCL 38 FLOW WDCATOR TRANSMITTER 10                        0    FEEDWAlER I AVXXJARYFEEDWATER TO                          ANOUARY      021.00      E MAN STM STOP STEAM GENERATOR OME~ FLOW                                                            ENCL WDCATOR TRANSMITTER 18              24R81 0  0        RESDVAL HEAT REMOVALI                                AVXIUARY      009.00        009 HALLWAY HEAT RBAOVALHEAT EASI'ESDUAL EXCHANGER HE-17E OUTLET LOW RANGE FLOW INDCATCR TRANSMITTER 10              24R011              RESDUAL HEAT REMOVALI EAST                          ANOUARY      009.00        609 HALLWAY RESDUAL HEAT REMOVALHEAT EXCHANGER HE.17E OUfLET HIGH RANGE FLOW WDCATQR TRANSMmER 18                        0        RESDVAL HEAT REMOVALI WEST                            AVXIUARY      009.00        009 HALLWAY RESDUAL HEAT REMOVALHEAT EXCHAJCER HE.17W OUTLET LOW RANGE FLOW NOCATOR TRANSMITTER 16                        0        RESDUAL HEAT REMOVALI WEST                            AUXIUARY      009.00        009 HALLWAY RESDUAL HEAT REMOVALHEAT EXCHANGER HE.17W OUILETHGH RANGE FLOW INQCATCR TRANSMmER 18      12                0      RESDVAL HEAT REMOVALI RESDVAL                          AVXLIARY      591.00        VESBBVLE
                                                  ~
HEAT REMOVALTO REACTOR COOLANT LOOPS &#xb9;2 AND &#xb9;3 COLD LEGS FLOW WDICATOR TRANSMITTER 10              24R61    0    BORON NJECBON I BORON WJECBON TO                        CONTANMENT      SRLOO    ANNULUS, QUAD NO.
REACTOR              LOOP  &#xb9;I FLOW                                                    1 INDICATORTRANSMfTTER 10                        0    BORON NJECBQN I BORON NJECBON TO                        CONTANMENT    SQLOO      ANNULUS, QUAD NO.
REACTOR COOLANTLOOP &#xb9;2 FLOW                                                              2 WDICATOR TRANSMfflER 18                              BORON NJECBON I BORON NJECBON TO                        CQNTAWMENl'98.00          ANNVLVS,QUAD NO.
REACTOR COOLANT LOOP &#xb9;3 FLOW                                                            3 WDICATOR TRANSMmER 16                              BORON NJECBON I BORON NJECBQN TO                        CONTAWMB/f    59LOO      ANNULUS. QUAD NQ.
REACTOR COOLANT LOOP &#xb9;4 FLOW                                                            4 WDICATQR TRANSMflTER 10      12                        REFVEUNG WATER STORAGE TANK                            AVXIUARY    586.00    STORAGE TANKPIPE SUPPLY I REFV EUNG WATER STORAGE                                                      TUNNEL TANK 7K'XTREMELOW LEVEL TRANSMffTER 18      12      24LB451  0        REFV EUNG WATER STORAGE 7ANK                          ANOUARY      586.00    STORAGE TANKRPE SUPPLY I REFUEUNG WATER STORAGE                                                        TUNNEL TANIC Tl<~ LEVEL TRANSMITTER 10              24LS-120        DESEL FUEL OL I AB EMERGENCY DIESEL                        AVXLJARY    587.00      ABEMERDSLGEN FUEL OL DAYTANKQT 107~ HIGH LEVEL                                                          RM SWflCH &#xb9;1 10                        0    QESEL FUEL QIL I AB EMERGENCY DESEL                        ANOUARY      587.00      ABEMERDSLGEN FUEL QL DAYTANIC QT-107~ LOW LEVEL                                                          RM SWITCH &#xb9;1 10              24LS.122  0    DESEL FUEL OIL I AB EMERGENCY DESEL                      AVXIUARY      587.00      AB EMER DSL GEN FUEL OL DAYTANKQT-10M8 HIGH LEVEL
                                                                                                                                        'M SWITCH &#xb9;2 18              24LS 123  0    DIESEL FUEL OlL I AB EMERGENCY DIESEL                    ANOUARY      587.00      AB EMER DSL GEN FUEL OIL DAYTANKQT.1      07~    LOW LEVEL                                                  RM SWITCH &#xb9;2 10              24LS.125  0    QESEL FUEL OIL I CD EMERGENCY DESEL                      AVXLIARY    587.00      CDEMERDSLGEN FUEL QL DAYTANKQT.1 07CD HIGH LEVEL                                                        RM 24LS.126  0    QESEL FUEL OL/CD EMERGENCY QESEL                          AVXIUARY    587.00
* CD EMER DSL GEN FUEL OIL DAYTANKQT-1 07423 LOW LEVEL                                                      RM SWfTCH  &#xb9;I 10              24LS  127 0    DESEL FUEL QL/CD EMERGENCY DESEL                          ANOUARY      5S7.00      CD EMER DSL GEN FUEL OL DAYTANKQT.1 07423 HCH LEVEL                                                        RM SWITCH &#xb9;2 16              24LS-128  0    QESEL FUEL OL I CD EMERGENCY DIESEL                        AUXLIARY    587.00    . CD EMER DSL GEN FUEL OL DAYTANKQT-1074XJ LOW LEVEL                                                          RM SWITCH &#xb9;2 18              24JPP.21 0 0    MAN STEAM I STEAM GENERATOR OMEW1                          ANOUARY      633.00      E MANSlM STOP CHANNEL I STEAM PRESSURE                                                            ENCL TRANSMffTER 10              24IPP-21 2 0    MAINSTEAM I STEAM GENERATOR OMEWt                          AVXIUARY    033.00      E MAN SIM STOP CHANNEL IV REACTOR PROTECBON NPUT                                                          ENCL SfEAM PRESSURE TRANSMITTER 18                              MAW SIEAM I STEAM GENERATOR OME4-2                        AVXLIARY    633.00        W MN SIM STOP CHANNELI STEAM PRESSURE                                                            ENCL TRANSMfflER 10                              MAINSTEAM I STEAM GENERATOR QME4 2                        AVXLIARY    033.00      W MN STM STOP CHANNEL IS REACTOR PROTECBON                  INPUl'TEAM ENCL PRESSURE TRANSMITTER rb                          0    MANSTEAM I STEAM GENERATOR OMEN@                          AVXIUARY    033.00      W MN SlM STOP CHANNEL I STEAMPRESSUR E                                                            ENCL TRANSMffTER 10                              MAW STEAM I STEAM GENERATOR OME~                          AVXIUARY    CLIO        WMNSIMSTOP CHANNEL Si REACTOR PROTECBON NPUT                                                          ENCL STEAM PRESSURE TRANSMITTER
 
~ 1 1/8/96 12:41 PM                      DONALD C. COOK NUCLEAR PLANT UNIT 2                  &#xb9;                              Page&#xb9;24 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN
~          f                                    System  I Equipment Desai peon          Buodiny  Floor Bev    Room or Row Coi 14          2                        MANSTEAM I STEAM GENERATOR OME~                  AUXRJARY    033.00    E MANSTM STOP CHANNEL I SfEAMPRESSURE                                              ENCL TRANSMITTER 18          1  24IPP-242        0  MAN STEAM I STEAM GENERATOR OME~                  AVXNJARY    033.00    E MANSTM SIDP CHANNEL IV REACTOR PROTECAON INPUT                                            ENCL STEAM PRESSURE TRANSMITTER 18              248J.1 51                PRESSURIZER I PRESSURIZER OMEN            CONTANMENT    01 2.00  INSTRUMENThllQN LEVEL WDICATOR 1RANSMmEIl                                                RM 14          2  24ILP-1 51      0        PRESSURIZER I PRESSURIZER QMER            CQMTAWMENT    01 2.00  INSTIIUMEMTATlOM PROTECTION CHANNELI LEVEL                                                RM TRAN  SMIflER 14              24ILP.1 52      0        PRESSURIZER I PRESSURIZER OMEN            CONl'AWMENT  01 2.00  NSIRUMEMTATION PROTECllON CHANNEL 4 LEVEL                                              RM TRANSMITTER 14              24ILP.1 53                PRESSURIZER I PRESSURIZER OMER            CONTANMENT    012.00  NSIRUMEM'fhllQN PROTECTOM CHANNEL IS LEVEL                                                RM lRANSMITTER 14              2+PP  151      0        PRESSURIZER I PRESSURIZER OMEN            CONTANMENT    012.00  NSTRUMEMTATION PRQTECIION CHANNEL I PRESSVRE                                              RM TRANSMITTER 14              24PP-1 52                PRESSURIZER I PRESSURIZER OMEN            CONTANMEMT    012.00  WSTRUMENTATKN PROTECDON CHANNEL 5 PRESSURE            ~
RM 1RANSMITTER 18              24IPP.1 53      0        PRESSURIZER I PRESSVIBZER OMEN            CONTANMENT    012.00  NSIImMENfhllQN PROTECIIOM CHANNEL Si PRESSURE                                              RM TRAN SMI11ER 14              24IPS-1 21      0    REACTOR COOLAMfI REACTOR COO(ANT              CONTAWMENT    012.00    W CONT LOWER LOOP 82 HOT LEG WIDE RANGE PRESSURE                                          VENT RM TRANSMITTER 14              24(PS 122            REACTOR COOLANTI REACTOR CQQLANf              CQMTANMENT    012.00      E CONT LOWER LOOP N HOT LEG WIDE RANGE PRESSURE                                            VENfRM TRANSMITTER 10                              0    NUCLEAR WSIRUMENI'ATIONI NUCLEAR              CQHTAWMENT    020.00    REACTOR CAVIIY NSTRUMEMTATyQNSCVRCE RADIATIOM DETECTOR 18              24(IU03        0    NUCLEAR WSTRVMENTATIQNI NUCLEAR                CQMTAWMEMT, 024.00      REACTOR CAVIlY INSlRUMEMTA11ONSOURCE RANGE RADIATIQNDETECTOR 14            2~~1          '
CQNTAWMENTVENTILATIQHI LOWER                AUXSJARY    012.00  012 AS(LOCK AREA CONTANMEMfCHANNEL dl PRESSURE TRANSMfflER 1d                              0        CONTAWMENTVEMTLATIONILOWER                    AUXIUARY    012.00  012 Ad(LOCKAREA CONTAWMENTCHANNEL PRESSVRE  I PRmECDQN TRANSMITTER 18                              0  CONTANMENTVENTILATIQHI LOWER CONT                AUXIUARY    01 2.00  012 AHLQCKAREA CHANNELI PRESSURE PROTECBON
                                                        '1RANSMffTER 18              243Ffv21 0      0    REACTOR COOLANT PVMP SEAL WATER                AUXSJARY    587.00        587 HALLWAY NJ/LEAKOFFI RCP SEAL WATER NJECAOM 10 REACTOR COOLANT PUMP PP~1 LOW FLOW ALARMTRANSMITTER 14                              0    REACTOR COOLANT PUMP SEAL WATER                AUXSJARY    587.00        587 HALLWAY NJ/LEAKOFF I RCP SEAL WA1ER NJECTION TO REACTOR COOLANTPUMP PP~2 LOW FLOW ALARMTRANSMITIER 14                              0      REACfOR COOLANT PUMP SEAL WATER                AUXLIARY    587.00        587 HALLWAY NJ/LEAKOFF I RCP SEAL WA1ER INJECBON TO REACTOR CQO(AMT PUMP          PP~    LOW FLOW ALARM TRANSMITTER 1$              243FA.240      0      REACTOR COQLAMfPUMP SEAL WATER                  AU/0UARY    587.00        5$ 7 HAILWAY NJ/LEAKOFF I RCP SEAL WATER NJ ECDON TO REACTOR COQLANf PUMP          PP~    LOW FLOW ALARM TRANSMITTER 14        12                  0        CHARGNG (CVCS) I CVCS CHARGING              AUXIUARY    587.00        587 HALLWAY PUMPS DISCHARGE FLOW NDICATOR 18        12  2~1            0 TRANSMITTER LEIDONN(CVCS) I REACTOR COOLANT LETDOWN VOLUMECONTROL TANKTK 10 AUXIUARY    009.00      009 HAllWAY EXfREME HIGH LEVEL CONTROL TRANSMITTER 14        12                  0      LEIDQWN (CVCSI I REACTQR CQQ(AMT                AUXIUARY    009.00      009 HALLWAY LETDOWN VOLUME CONTROL TANKTK 10 IdGH LEVEL COMTROL TRANSMITTER 14            2-WDS 703        0          ESSEMIIAL SERVICE WATER I EAST            SCREENHQUSE  591.00  E ESSMIL SERV WTR ESSENTIAL SERVICE WA1ER PUMP PP.TE                                            PMP RM (XSCHARGE STRANER OME44E HIGH (XFFEREMIIALPRESSVRE SWITCH 18              2-WDS.704        0        ESSENTIAL SERVICE WATER I WEST            SCREENHOUSE  591.00      W ESSMIL SERV I        ESSENllAL SERVICE WATER PUMP PP.7W                                        WIR PMP RM (XSCHARGE STRANER OME44W HIGH (XFFER EHTIALPRESSURE SWITCH 14              2 WPS 702        0          ESSENTIAL SERVICE WATER I EAST              1UR BINE  509.00    ESSNlL SERV WTR ESSENllAL SERVICE WATER SUPPLY                                          PIPE TUNN HEADER PRESSURE SWITCH 2.WPS 700        0        ESSENIIAL SERVICE WATER I WEST                TURBINE  549.00    ESSN1L SERV WTR ESSEMllAL SERVICE WATER SUPPLY                                          PIPE 1UNN HEADER PRESSURE SWITCH 14                              0  DIESEL COMBVSTIQH AIR I AB EMERGENCY              AUXIUARY  587.00    AB EMER DSL GEN (XESEL FRONT BANKAR CHEST EXTREME                                                RM ISGH PRESSURE SWITCH
 
1/8/96 1241 PM                      DONALD C. COOK NUCLEAR PLANT UNIT 2                    &#xb9;                          Page  &#xb9; 2S SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN Equip 18 Ttain 2                  0
                                                ~    I Equipmont Oeaaiption IXESEL COMBUSBON AIR I CD EMERGENCY                  AUXLIARY  587.00  CO EMER DSL GEN OESEL FRONT BANKAIR CHEST EXTREME                                                RM I&#xb9;GH PRESSURE SWITCH 18        12  24RV4IACK 152  0      CQMIROL AIR I PRESSURIZER TRA&#xb9;I                CONTA&#xb9;IMENT  050.00  UPPER CONT, QUAD REUEF VALVENRV.1 52 VALVE '0'RESSURE 4
RACK (EMERGENCY AIR PRESSURE REGULATOR 18      12  2.XRV4IACK.153  0      CONTROL AIR I PRESSURIZER TRAN                  CONTA&#xb9;IMENT  050.00  UPPER CONT, QUAD REUEF VALVE&#xb9;NRV.153 VALVE'A'RESSURE 4
RACK EMERGENCY AIR PRESSURE REGUlATOR 24TR415    0      COMPONENT COQUMG WATER I EAST                    AVXLIARY  800.00      000 HALLWAY COMPONENT COOUNQ WATER HEAT EXCHAHGER HE.15E CCW OUTLET TEMPERAlURE RECORDER THERMAL 10                            0      COMPONENT COOUNG WATER I WEST                    AVXLIARY  000.00      800 HALLWAY COMPONENT COOUNQ WATER HEAT El@HANGER CCW OUTLET TEMPERATURE RECORDER THERMAL SENSOR 12                          RESOUAL HEAT REMOVALI RESDUAL                    AUXIUARY  800.00  E RHR HEAT XCHGR HEAT REMOVALTD REACTOR COOLAMf                                                RM Uxps &#xb9;2 8 &#xb9;3 coLD LEGs TEMFERATURE RECORDER lHER MALSENSOR 10                24ITR.110    0    REACTOR COOLAMI'IREACTOR COOLANT                  CONTA&#xb9;IMENT  50LOO  LOWER CONf, QUAD LOOP &#xb9;1 HQT LEG WIDE RANGE                                              NO. 1 TEMPERATURE RECORDER THERMAL SENSOR 10                24ITR.1 20  0    REACTOR COOLANTI REACfOR COQlhNT                  COMTA&#xb9;IMEMT  017.00  LOWER CONT, QUAD LOOP &#xb9;2 HOT LEQ WIDE RANGE                                              NO. 2 TEMPERATURE RECORDER THERMAL SENSOR 10                24ITR.1 30  0    REACTOR COOLANTI REACTOR COOLANT                  COMTA&#xb9;IMEMT  025.00  LOWER CONT, QUAD LOOP &#xb9;3 HOT LEQ WIDE RANGE                                              NO. 3 TEMPERATURE RECORDER THERMAL SENSOR 10                24ITR-1 40      REACTOR COOLANTI REACfOR COOLANT                  CONTAINMENT  01 7.00 LOWER CONT, QUAD LOOP &#xb9;4 HOT LEG WIDE RANGE                                              NO. 4 TEMPERAlURE RECORDER THERMAL SENSOR 24IIRQI0    0  REACfOR CQQLAMfI REACTOR COOLANT                  COMTAOIMENT  017.00  LOWER CONT, QUAD LOOP &#xb9;1 COLD LEG WIDE RANGE                                              NO. 1 lEMPERATURE RECORDER THERMAL SENSOR 10                            0    REACIQR COOLANTI REACTOR CQQlhNT                  CONTA&#xb9;IMENT  017.00  LOWER CONT, QUAD LOOP &#xb9;2 COLO LEG WIDE RANGE                                              NQ. 2 TEMPERAlURE RECORDER THERMAL
                                                  ~
0    REACTOR COOLANT I REACTOR COOLANT                  COMTA&#xb9;IMENT  017.00  LOWER COMl; QUAD LOOP &#xb9;3 COLD LEG WIDE RANGE                                              NO. 3 lEMPERAlURE RECORDER THERMAL SENSOR 19        2      24ITR-240  0    REACTOR                I REACTOR COOLANT          CONTNNMEMT  017.00  LOWER CONT, QUAD LOOP &#xb9;4 COLD LEQ WIDE RANGE                                              NO. 4 lEMPERATVRE RECORDER THERMAL SENSOR 2-Vf$201          TURSNE SQLDNG VEMILABQNI EASf                      TURSNE    591.00    E MTR ORIV AUX MOTOR DRNEN AUXIUARYFEEDWATER                                            FEEDWTR PMP PUMP ROOM EXHAUST FAN HVWFP441 10                            0  TURSNE BVLD&#xb9;IGVEMBLAllQNI lURSNE                      TURSNE    501.00      TB DRIVEN AUX DRIVEN AUXILIARYFEED PUMP ROOM                                            FDWTR PMP NORTH EXHAUST FAN HVWFP.TI 2-VT$204    0  llIRSNE BVLDOIG VEMBlhllQNI TURSNE                    lURSNE    501.00      TB DRIVEN AVX DRIVENAUXLIARYFEED PUMP ROOM                                              FDWTR PMP SOUTH EXHAUSl'ANHV.AFP.12 0    lURSNE BULDOIQ VENBlhllONI WESf                    lURSNE    501.00  W MTR DRIVEN AUX MOTOR DRNEN AUXLIARYFEEDWAlER                                              FDWIR PMP PUMP ROOM WESl'XHAUSTFAN HV.AFP X2 10                                        IXESEL ROOM VEMBlhBQNI AB                              009.00  REFUEL WIR STOR EMERGENCY DIESEL GENERATOR ROOM                                              TANKAREA VEMILABQNSUPPLY FAN HVCKS.2 QUTSCE AIR THER MOSTAT 2-VT$341                IXESEL ROOM VENTILhllQNI AB                  AUXLIARY            AB EMER DSL GEN EMERGENCY DIESEL GENERATOR ROOM                                                  RM VENBLhllQNFANS HV~X.2 THERMOSTAT 10                                          IXESEL ROOM VENBLABQMI CO                    AUXLJARY  590.00  RCTR CABLE lUNN, EMERGENCY DIESEL GENERATOR ROOM                                                QUAD 3 VEMILABQNSUPPLY FAN        HV~1 OUTSOE AIR THERMQSI'AT 10                              0          IXESEL ROOM VEMBLABQNI CO                    AUXIUARY  587.00  CD BRIER OSL GEN EMERGENCY IXESEL GENERATOR ROOM                                                RM VENTXABQNEXHAUSf FAN HVZXeX-1 THERMOSTAT 12                  0        AVXLIARYBULDINGVEMBlhTIQNI                      AVXIUARY  809.00    &#xb9;IVERTER AREA CONSOL ROD DRIVE EQUIP ROOM AND
                                      &#xb9;IVAREA VEMfNORTH SUPPLY FAN HV SGRS 1h TEMPERATURE SWIICH
 
1/8/96 12:41 PM                DONALD C. COOK NUCLEAR PLANT UNIT 2                            &#xb9;                              Page  &#xb9;26 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN
                ~ID      Rev No Boerrur9  Floor Eiev    Room or Rorv Col 2-VTS451  0        AVXLIARYBVLJXNG VENTLATIQHI                            ALDQUARY      009.00      CRO EQUIP RM CONTROL ROO DRIVE EQUIP ROOM ANO 0IV AREA VENT NORTH SUPPLY FAN HV-AUXILIARY SGRS 1A TEMPERATURE SWITCH 12                                BVuXNG VENlLATIONI 4KV                      AUXNJARY      500.00  4KV RM ~ SOOV SWGR ROOM 500 VOLT SWITCHGEAR XFRMS                                                          AREA TR21 8 ANDTR21 0 AREA VENT SUPPLY FAN HV~RS 7 TEMPERATURE SWITCH AVXLIARYBViLDNGVEHTLATKNI500VAC                            ALDQUARY      eu.oo          4KV ROOM MOTOR CONTROL CENTER MEZZAN<<IE                                                  MEZZAN9IEAREA AREA VENfSUPPLY FAN HV~RS4l .
TEMPERATURE SWITCH 10        12            0    AIDQUARYBVILDNGVENTLAllONI CTRL                          AUXLIARY    509.00      0IVERTER AREA ROO DRV EQUIP ROOM ANO 0IV AREA VENf OUTSOE AIR INLETDAMPER HV~R4IO-2 TEMPERATURE SWilCH 12            0    AUXLIARYBVuXNG VEHTLATIONI CTRL                          AUXLIARY    009.00      0IVERTER AREA ROO DRIVE EQISP ROOM AND 0IV AREA VENfRECRC AIR 0ILET DAMPER HV~R-MO.T TEMPERATURE SWITCH 10          12            0      AVXIUARYBVLJXNG VEHTLATIONI CRO EQUIPMENT ROOM ANO 0IVERTER AREA VEHILAlTONNORTH SUPPLY FAN HV-SGRS4A lEMP SWITCH 10          12                  AVXIUARYBVLDINGVEHTLATIONI CTRL                          AIDQUARY      009.00        CRO EQUIP RM ROO DRIVE EQQP ROOM ANO 0IV AREA VENTLAllONSOUTH SUPPLY FAN HV SGR$ 4A TEMPERATURE SWITCH 0    SCREEIIHQVSE VENTILhllONI UNIT 2 EAST                    SCREENHOUSE    591.00    E ESSNTL SERV WTR ESW PUMP RQQMlEMPERATURE SWITCH                                                          PMP RM 2.VTS.704      SCREENHQVSE VENTILhllQHI UNIT 2 WEST                          V<<2      591.00      W ESSNIL SERV ESW PUMP ROOM TEMPERAlURE SWITCH                        SCREENHOVSE                    WTR PMP RM 0      AUXILIARYBUIUXNG VENllLATIONI 4KV                      AUXLIARY      509.00      4KV RM AB 4KV ROOM AB 4CV SWITCHG EAR AREA                                                      SWGR AREA VENTLAllONSUPPLY FAN HV~RS 2 THERMALSENSOR 0      AVXIUARYBULGING VEHTLhllQNI 4KV                        AUXLIARY      509.00      4KV RM CO 4KV ROOM CO 4CV SWITCHG EAR AREA                                                      SWGR AREA VENTLATIONSUPPLY FAN HV~RSG THERMALSENSOR 10                        0      AUXILIARYBVLOINGVENTILATIONI 4KV                        AUXLIARY      d13.00          4KV ROOM ROOM SDOV SWGR XFMRS TR21B ANO                                                  MEZZAN9IEAREA IR2l D AREA VENT SUPPLY FAN HV~RS 7 TEMP SWITCH THERMALSENSOR 10                        0      AVXLIARYBVLTXNGVENllLhllONI4CV                        ~  AUXUARY      509.00    4KV RM    SQOV SWGR ROOM SDOV SWGR XFMRS TR21A AHO                                                          AREA TR21 C AREA VENfSUPPLY FAH HYNESS TEMP SWITCH TEMP SWITCH 2%11    0      EQUIPMENT CONTROL ANO IHDICATIQH                        AUXLJARY      533.00      CONTROL ROOM STATIONS I AVXLIARYRELAYPANEL A11 2%13    0      EQIJ1%KNT COHTRQI. ANO NOK'ATION                        AUXLIARY  . 53%00      CONTROL ROOM STATIONS I AVXLIARYRELAY PANEL A13 2~1      0        EQUiPMENT CONTROL ANO 9IOK'ATION Sl'AllONS I CONTROL ROOM AIR HANDUNG AUXLJARY      050.00    CTRL RM AIR CONDIT RM SVBPANEL <<1 0        EQVIPMENI'ONTROLANO INDICATION                          AUXLIARY      550.00    CTRL RM AIR CONDIT SfhTKNS I CONlROL ROOM AIR HAHDUNG                                                            RM SVBPANEL <<2 2~2          120VI220 CONTROL ANO INSTRVMENTAllQN I REACTOR PROTECOON TRAN ALDQUARY      533.00      CONTROL ROOM RELAYCABINET&#xb9;2  'A'VXLIARY ORB-2    0    120V/220 CONTROL ANO NSIRVMENTATION I REACTOR PROTECTION TRAN 'Tf AVXLIARYRELAY CABINET&#xb9;2 12            0        BORON MAKEUP (CVCS) I BORIC ACID                        AUXLIARY    53%00        CONTROL ROOM CHARGING ANO LETDOWN COHTROL 2~L      0
                                        'V PANEL 120r220V CONTROL AND INSTR VMENTATIQN I TRAN BATTERYCXSTRIBUTIONTRAN AUXLIARY    033.00            HOR MAL SLOWDOWN CHARGER BOA        CONTROL        'A'ATfERY FLASHTANKROOM BOX 12                          CQNTANMENTVEHTLATIQNI                              AUXLIARY    53L00          533 HALLWAY CONTAiNAENTAVXLIARIESSVBPANEL LA 0          CQMPQHENI'OQUNG WATER I                              AUXLIARY    533.00      CONTROL ROOM COMPONENT COOUNG WATER CONTROL PANEL EQUIPMENT CONTROL ANO INDICATIQH                        AVXLIARY    533.00      CONTROL ROOM i STAllQNSI REACTOR PROTECIION CONTROL GROUP &#xb9;I CABINET<<I', 15, CK<<14 15 J 1 EQVIPMENI CONTROL ANO INDICATlON                        AVXLIARY      533.00      CONTROL ROOM STATIONS I REACTOR PROTECllON CONmCL GROUP <<2 CABINET<<17, <<Ia a
                                          <<I ACK<<171d S 1 0      EQUIPMENT CONTROL ANO INOICATKH                        AVXlJARY      SM 00        CONTROL ROOM STATeNS I REACl'OR PROTECTION CONTROL GROUP <<3 CABINET<<20, &#xb9;21 ACK <<21 S
 
I 1N96 1241 PM                DONALD C. COOK NUCLEAR PLANT UNIT 2                        &#xb9;                        Page  &#xb9; 27 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
                                      ~
FOR SEISMIC WALKDOWN EqiIP    Tain                                I qadi'pnwnt DescriPbon EQINPMENT CONTROL ANO WOICATIOM                      AUXIUARY  633.00  CONTROL ROOM I
STATIONS REACTOR PROTECTION CONTROL GROUP &#xb9;4 CABWET &#xb9;22, &#xb9;23, t24, 8 &#xb9;25          &#xb9;2223 24 5 242.26  0      EQUIPMEMTCONTROL AND WOICATION                        AUXNJARY  633.00  COMIROL ROOM STATKk4S I REACTOR PROTECIION CONTROL INPUT CABINET&#xb9;26 24>27    0      EQVIPMENfCOMIROL AND WDICAIION                        AUIGUARY  633 00    CONTROL ROOM STATIONS I REACTOR PROTECBON CONTROL INPUT CABWET &#xb9;27 CONDENSATE I CONDENSATE PV MP                      AUXIUARY  63L00    CONTROL ROOM CONIROL PANEL 0    MISCELLANEOUSEQUIPMENI'UPPORTS I                        AUXNJARY  CO.00    CONTROL ROOM CONDEHSATE PANEL REAR
                                      ~ INSIIIUMENTIRELAY    RACK 0      EQUIPMENT CONTROL ANO WDICAllON                      AL00UARY  687.00  AB EMER DSL GEN SfhllONSI AB EMERGENCY DIESEL                                                RM GENERATOR OME.I50AB CONTROL SUBPANEL 24IGAB.X  0      EQLNPMENT COMIROL ANO INDICAllQN                      AUXIUARY  567.00  ABEMERDSLGEH STATNNSI AB EMERGENCY IXESEL                                                  RM GENERATOR OME-150AB AUXNJARY SUBPANEL 0      EQUIPMEMTCONIROL ANO WDIChllOH                        AUXNJARY  587.00  CD EMER DSL GEN STATIONS I CD EMERGENCY DIESEL                                                RM GENERATOR OME-1 50CD CONTROL SVBPANEL 247GCD X  0      EQINPMENT CONTROL AND WIXCATIOM                      AUXIUARY STAllONS I CD EMERGENCY IXESEL GENERATOR OME.1 50CD AUIGUARY 0    lURBWE INSTRUMENTATION6 CONTROL I                      AVXIUARY  633.00    CONTROL ROOM DELTA'P AND UNIT CONTROL PANEL 24J'R  0  'ISCELTANEOUS EQUIPMENT SUPPORTS I                        AUXIUARY  633.00    CONTROL ROOM EMERGENCY RRE PANEL WSIIIUMEMTIIIEthYRACK 0    ESSENTIAL SERVICE WATER I ESSEMIIAL                    AUXIUARY  63L00    COMIROL ROOM SERVICE WATER COMTROL PANEL NUCLEARINSTRUMENTAIIONI FLUX                        AUXNJARY            CONIROL ROOM CONTROL PANEL 12    24R-1        MISCELLANEOUS EQiflPMENTSUPPORTS I                      AUXIUARY  63300    CONTROL ROOM GENERATOR PANEL REAR WSIRVMEMTlRELAYRACK &#xb9;1 MISCEUANEOUS EQINPMENT SUPPORTS I                      AUXIUARY  633.00    CONTROL ROOM GENERATOR PANEL REAR                                                        \
WS IRVMENTIIIELAYRACK &#xb9;2 2~B      0    MISCELLANEOUS EQINPMENT SUPPORTS I                      AUXIUARY  633.00    CONTROL ROOM GENERATOR PANEL REAR INSTIIUMENTIIIElhYRACK 2GRC                              EQUIPMENT SUPPORTS I
                                                                    %'ISCELthNEOVS AUXNJARY  63S.OO    CONTROL ROOM GENERAlOR PANEL REAR WSIRUMENTIREIAYRACK 'V SAF EIY WJECIIOM I UNff2 HOT                    AVXIUARY  633.00    COHTROL ROOM SHUTDOWN PANEL CONTAINMENTSPRAY I CONTAWMENT                        AVIGUARY  63300      CONTROL ROOM ISOLATIONVALVECONTROL PANEL 24SI  1              STEAM GENERATWG I SIEAM                        AUXIUARY  612,00 GENERATORS      tl AND &#xb9;4 LOCAL SHUTDOWM STATION 0            STEAM GENERATING I STEAM                        AUXIUARY  501.00        STARlVP GENERATORS &#xb9;2 ANO &#xb9;3 LOCAL                                              BLOWDNW SINIIDCWHSTATION                                                FlhSHTANK RM 12                      PRESSUI62ER I REACTOR COOLANT                      AUXNJARY  587.00      587 HALLWAY SYSTEM CHAItGWG ANO LETDOWN LOCAL SH VIDOWNSTATIOM 12            0      EQUIPMENT CONTROL ANO WIXCATION STATKWI REACTOR COmhMT SYSTEM AUXIUARY  567.00,    587 HALLWAY lEMPERATVRES ANO STEAM GENERATORS LOCAL SHUTDOWN STAllON 0      EQIflPMENTCONIIIOLANO WOICAlION                      AUXNJARY  612.00    E MAWSTM STOP STATIONS I REACTOR COOLANT LOOPS                    &#xb9;I                          ENCl.
ANO &#xb9;4 1EMPERAlVRES. SGS &#xb9;1 ANO &#xb9;4 PRESSURES 1 OCAL SHUTDOWN SfATION 0      EQVfPMENI'ONTROI.AND WOIChllON                        AUXIUARY  598.00  RCTR CABLE TUNN, SfATIONS I LOCALSHUIDOWN STAllON                                                CNIAD 1 5XX 0      EQUIPMENT CONTROL ANO WOICATION                      AUXIUARY  591.00        STARTUP STATIONS I IEACTOR COOlhMT LOOPS &#xb9;2                                            BLOWOCWW ANO &#xb9;3 lEMPERAlURES, SG'S t2 ANO &#xb9;3                                          FlASHTANKRM PRESSURES LOCAL SHUTDOWN STATION EQINPMEMT CONTROL ANO WOICATION                      AUXIUARY  506.00  RCTR CABLE TVNN, STATIONS I LOCAL SHVIDOWN STATION                                              QUAD 3 6XX 0      EQUIPMENT CONTRCL ANO WIXCATIOM                      AVXIUARY  633.00    CONTROL ROOM STAlIONS I NUCLEAR INSTRUMENTATION SYSIEM PROTECTION CHANNEL I CONTROL PANEL 0      EQINPMENT CONTROL AND WOICATION                      AUXIUARY  633.00    CONTROL ROOM SThllONS I INJCLEAR WSTRVMENTATIOH SYSTEM PROTECIIOM CHANNEL IN CONTROt. PANEL
 
1/8/96 1241 PM              DONALD C. COOK NUCLEAR PLANT UNIT 2            &#xb9;                        Page&#xb9;28 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN System  / Equipment Deacnpnon    Bunting Floor Bev    Room or Row Col 0    NUCLEAR INSTRUMENTATIONI NUCLEAR          AUX&#xb9;JARY  500.00  RCTR CABLETUNN INSTRUMEHTAT1ONWIDE RAHGE                                      QUAD 1 RANATIONAMPUFIER CANNET 0    NUCLEAR INSTRUMENTATX?NI NUCLEAR          AUXIUARY  033.00    CONTROL ROOM 0
PR~
INSTRUMENTATIONWIDE RANGE SIGNAL CAQNET NUCLEAR INSIRVMENThllONI NUCLEAR          AVXdJARY  590.00  RCTR CABLE TUNN,
                                    ,INSTRUMENTATlONSOURCE RANGE                                      QUAD 1 IANATIOHDETECTOR NIB 23 AMPUFIER CABINET 2~234SOL  0    NUCLEAR ItISIRVMENTATIONI NUCLEAR          AUXIUARY  500.00  RCTR CABLETUNN, INSTRUMENTATIONSOURCE RANGE                                      QUAD 1 QGNAL ISOLATOR CABINET NUCLEAR INSIRUMENTATIOHI NUCLEAR          AUXIUARY  500.00  RCTR CABLETUNN,
                                  'tSTRVMENTATIOHSOURCE RANGE                                        QUAD 1 QGNAL PROCESSOR CABINET 0    MISCELlhNEOUS EQUIPMENT SUPPORTS I          AUXIUARY  03%00      CONTROL ROOM NUCLEAR INSTRUMENTAllONSYSTEM REAR INSTRUMENT/RETAYRACK 0    PRESSURIZER I PRESSUIBZER CONTROL          AUXIUARY  033.00    CONTROL ROOM PANEL 0    ROO CONTROL ANO INSTRUMENTATIOHI          AUXNJARY  CQ.00      CONTROL ROOM REACTOR CONTROL RODS CONTROL PANEL REACTOR COOLANTI REACTOR COOLANT            AUIOUARY  033.00      CONTROL ROOM PUMP CONTROL PANEL 12                  REQOUAL HEAT REMOVALI REQDVAL            AUXdJARY  03300      COHIROL ROOM HEAT REMOVALCONTROL PANEL REACTOR PROTECllON I REACTOR          AVIOUARY  033 00    CONTROL ROOM PROTEClXW CHANNEL I CAB ~ 2, 3 0  &#xb9;I    &#xb9; CK&#xb9;1 23 0 0          REACTOR PROTECTION I REACTOR          AUXIUARY  033.00    CONTROL ROOM PROTECIIOH CHANNEL d CABNET &#xb9;5, 0 0 7 CK &#xb9;5 0 7 0 REACIOR PROTECTION I REACI'OR        AVXdJARY  033.00    CONTROL ROOM PROTECllON CHANNEL lil CABINET&#xb9;0, 10 0 11    CK &#xb9;0 10 11 REACTOR PROTECTION/REACTOR            AUXIUARY  OX%00      CONTROL ROOM PROTECRON CHANNEL IV CABINET&#xb9;12 0
                                              &#xb9;I3 CK &#xb9;1 2 IL 1 REACTOR PROTECllON I REACTOR          AUI0UARY  033.00    CONTROL ROOM PROTECTION AND SAFEGUARD ACTUATION TRAIN'A'ABINET 0          REACTOR PROTECllON I REACTOR          AUXLJARY  033.00    CONTROL ROOM PROTECTION AND SAFEGUARD ACTUATIOH TRAN 'P CABINET REACTOR PROTECTION I REACTOR          AUXdJARY  03%00      CONIROL ROOM PROTECTION AND SAFEGUARD AClVATION TRNN 'A'UXIUARYCABINET 0          REACTOR PROTECTION I REACTOR          AUXIUARY  033 00    CONTROL ROOM PROTECDON AND SAFEGUARD ACTVATIOH TRAIN %'IMUARYCABINET 0      ELECTRICAL OLSTRIBVTION, 4100VAC I      AVWUARY    033.00    CONTROL ROOM STAllON ALBOUARIES CONTROL PANEL' NUCLEAR SAMPUNG I NUCLEAR SAMPUNG            AUXNJARY  507.00  NUCLEAR SAMPUHG SYSTEM CONTROL PANEL                                        RM STEAM GENERATION I STEAM GENERATOR          AUXIUARY  033.00    CONTROL ROOM ANO AUXdJARYFEED PUMP CONTROL PANEL 12                'AFEIYdtJECBOHISAFETY&#xb9;UECIION                AUXIUARY  033.00    COHTROL ROOM CONTROL PANEL 12                  CONTAWMENTSPRAY CONTHNMENT I              AUXIUARY  033.00    CONTROL ROOM SPRAY CONTROL PANEL 12          0    MISCEUANEOUS EQUIPMENI'SUPPORTS I            AUXIUARY  033.00    CONTROL ROOM STATION AUXIUARIESREAR
                                        &#xb9;ISTRUMENT/RELAYRACK &#xb9;1 MISCEUANEOUS EQUIPMENT SUPPORTS I            AVXIUARY  033 00    CONTROL ROOM STATeH AUXIUARIESREAR
                                      " &#xb9;ISmUMENT/RELAY RACK        &#xb9;2 MISCIBLANEOUS EQUIPMENT SUPPORTS I          AUXIUARY  033 00    COtfTROL ROOM STATION AUXIUARIESREAR drSTRUMENT/RELAYRACK &#xb9;3 24Re  0    MISCELLANEOUS EQVIPMEHT SUPPORTS I          AUXIUARY  033.00      CONTROL ROOM STATION AUXIUARIESREAR tNSTRUMENT/RELAY RACK &#xb9;4 12                MISCEllANEOUS EQVIPMEHT SV PPORTS I          AUXIUARY  033.00      CONTROL ROOM ENG&#xb9;IEER SAFETY SYSTEM REAR
                                          &#xb9;ISlRUMENT/REIAYRACK 2~R    0    MISCELLANEOUS EQVIPMENT SUPPORTS I          AUXIUARY  033.00      CONTROL ROOM NUCLEAR dtSIRUMENTALSOURCE RANGE N? I INSTRUMENT/RELAYRACK 0    MISCELLANEOUS EQUIPMENT SUPPORTS I          AUXIUARY  033.00    CONTROL ROOM CONTROL ROOM SOUTHWEST INSTRUMENT/RELAYRACK 0      EQI&#xb9;PMENT CONTROL ANO INOICATION            TVRQNE  501.00      TB DRIVEN AVX SThllONS I TURBINE DRIVEN AUXFEED                                  FDWTR PMP PUMP SUBPANEL 2 TRB  0    MISCEIJANEOVS EQVIPMEHT SUPPORTS I          AVX&#xb9;JARY  033.00    CONTROL ROOM TVRB&#xb9;tfPANEL REAR INSTRUMENT/RELAY RACK 'IY
 
1/8/96 12:41 PM                      DONALD C. COOK NUCLEAR PULNT UNIT02                                    Page 0 29 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN 6  Eqrrlp      Train MISCELLANEOUS EQUPMENT SUPPORTS I      AUX        03%00    CONTROL ROOM TVRBWE PANEL REAR WSlRVMEHTIRELAY RACK 'V 0  MISCELLANEOUSECLISrMENT SUPPORTS I    AUXIUARY      033.00    CONTROL ROOM 1VRBWE PANEL REAR WSYRUMEHTIRELAY 2.TSG4Q47            COMPUTER SUPPORT SYSTEMS I TSC    AUXILIARY    03%00      CD HALLWAY COMPUTER WPUTIOUTPUT CABWET &#xb9;07 2-TSC4049            COMPUTER SUPPORT SYSTEMS I 'PK    AUXIUARY    033.00      033 HALLWAY COMPUTER WPUAQUTPUT CABINET&#xb9;0 2.TSC40.1 3    0      NONE I TSC COMI?VIER WPUTIQUlPUT  AUXLIARY    033.00      CD HAILWAY CABWET 3&#xb9;I 2-TSC40 15            COMPUTER SUPPCRT SYSlEMS I TSC    AUXLIARY    033.00      CD HALLWAY COMPUIER WPUTIQUTPUT CABWET &#xb9;1 5 2-VS                                    I CONTAINMENTVENTLAAQN YENALAllQN      AUXLARY      033.00    CONTROL ROOM CONTROL PANEL 12 J16-10s      SPENT FUEL PIT CQQUNGICLEANUP a CCW  U4 AUXIUARY    009.00    SPENT FUEL PIT I SOUTH SPENT FUEL PIT HEAT                          HEAT XCHGR RM EXCHANGER 12      2Jr6.11    0    REACTOR COOUWT PUMP SEALWATER        AUXLIARY    009.00    SEAL WTR HEAT WJILEAKOFFI REACTOR COO(ANT PUMP                              XCHGR RM SEAL WATER HEAT EXCHANGER 12      2+IE-13    0      LETDowN (cvcsI IExcEss LEAK%IN  CONTAWMENT    012.00  REGEN HEAT XCHGR HEAT EXCHANGER                                        RM 12      2 JIB-14            LETDOWN (CVCS) I LE(DOWN HEAT    AUXLIARY    033.00    LEIDOVIWHEAT    ~
EXCHANGER                                      XCHGR RM 2+r6-1 SE  0      COMPONENT COQUNG WATER I EAST      AUXLJARY    009.00      009 HALLWAY COMPONENT COOUNG WATER HEAT EXCHAIIGER 2&6.'lSW    0      COMPQHENT COOUNG WATER I WEST      AUXIUARY    009.00      009 HALLWAY COMPONENT CCXXWG WATER HEAT EXCHANGER 2JIE-17E    0        RESIDUAL HEAT REMOVALI EAST      AUXIUARY    009.00  6 RHR HEAT XCHGR RESCUAL HEAT REMOVALHEAT                                      RM EXCHANGER 2JIE.17W              RESQUAL HEAT REMOVALI WEST      AUXLIARY    OXl.00  W RHR HEAT XCHGR RESOWN HEAT REMOVALHEAT                                      RM EXCHANGER 2+IE-186    0          'ONTAWMENTSPRAY I Ehsf        AUXIUARY    009.00  6 CQHT SPRAY HEAT CONTAWMEHfSPRAY HEAT EXCHANGER                                  XCHGR RM 2+I6.18W                  CQHTAWMENTSPRAY I WEST        AUXIUARY    009.00    W CONf SPRAY CONTAWMENT SPRAY HEAT EXCHANGER                              HEAT XCHGR RM 0        REQOUAL IKhTREMOVALI EAST      AVXLIARY      573.00  EAST RHR PUMP RM RESOUAL HEAT REMOVALPUMP PP456 MECHANCALSEAL &%ATEXCHANGER 0        RESIDUAL HEAT REMOVALI WEST    AUXIUARY      S73.00    W RHR PMP RM RESOUAL HEAT REMOVALPUMP PP45W MECIIAHICALSEAL SKAT EXCHANGER 0    COW I EAST CQNTAWMENTSPRAY PUMP      AUXLIARY      573.00  E CONT SPRAY PMP PP4E MECHANCALSEAL HEAT                                      RM EXCHANGER 2+(643W          CCW I WEST CONTAINMENTSPRAY PUMP    AUXIUARY      573.00  W CONT SPRAY PMP PP4W MECHANCALSEAL HEAT                                      RM 2Jr644AE      0    COMPONENT COOUNG WATER I NORTH      AUXIUARY      587.00  H SAFElY WJ PMP SAFETY WJECAQH PV MP PP-20H                                    RM CXIAIOARDMECHANCALSEAL HEAT EXCHANGER 2J<64aJlw            COMPONENT COOUNG WATER I NORTH      AUXLIARY    SS7.00    N SAFETY WJ PMP SAFElY WJECAQN PUMP PP-20N WBOARD                                    RM MECHANCALSEAL HEAT EXCHANGER 0      COMPONENT COQUNG WATER I SOUTH      AUXIUARY    587.00    S SAFElY WJ PMP
                                            " SAFETY WJECAON PUMP PP-20S RM OUTBOARD MECHANCALSEAL HEAT EXCHANGER 0      COMPONENT COOUNG WATER I SOU1H      AUXIUARY    587.00    SSAFEIYWJPMP SAFElY WJECAON PUMP PP-20S INBOARD                                  RM MECHANCALSEAL HEAT EXCHANGER 0      COMPONENT COOUNG WATER I NORTH      AUXIUARY    587.00    N SAFEIY INJ PMP SAFElY WJECTKW PUMP PP-28N LUBE OL                                  RM COAXER 0      COMPONENT COQUNG WATER I SQUIB      AUXIUARY  ~ 587.00    S SAFETY WJ PMP SAFElY WJECAON PUMP PP-20S LUBE CL                                  RM 2+r64dEM      0      COMPONENT CQQUNG WATER I EASf      AUXIUARY    587.00    6 CENTRIFUGAL CENTRIFUGAL CHARGING PUMP PP406                          CHARG PMP ROOM WBOARD MECfUJIICALSEAL HEAT EXCHANGER 21                2%645ES      0      COMPONENT COQUNG WATER I Ehsf      AUXIUARY    587.00    6 CENTRIFUGAL CENIRIFVGALCHARGWG PUMP PP406                              CHARD PMP ROOM OUAX3ARDMECHANICALSEAL HEAT EXCHANGER 2 JIBE.WN    0      COMPOHENT COOUNG WATER I WEST      AUXIJARY    587.00    W CENTRIFUGAL CENlRIFUGALCHARGWG PUMP PP40W                                CHARD PMP RM WBOARD MECHANCALSEAL HEAT EXCHANGER 2Jr640.WS    0      COMPONENT COOUNG WATER I WEST      AUXIUARY    587.00    W CENTRIFUGAL CEHlRIFVGALCHARGWG PUMP PP4OW                                CHARG PMP RM OUTBOARD MECHANCALSEAL HEAT
 
1N$ 6 12:41 PM                          DONALD C. COOK NUCLEAR PLANT UNIT 2          &#xb9;                            Page      &#xb9; 30 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR SEISMIC WALKDOWN Equip      Train  Equipment IO  Res          System/Equipment Oescripbon                Floor Bev      Room or Rorr Cd No 21          2        2+IE47E            MISCBJAMEOVS SEAUNQ AND COOUNQ I        AVXIUARY    587.00      E CENTRIFUGAL EAST CEMTltIFVQALCHARGNQ PUMP PP-                              CHARD PMP ROOM 5OE GEAR OiL COOLER 0    MISCELLANEOUS SEAUNQ ANO COOUNG I        AUXLIARY    587.00    W CENTRIFUGAL WEST CEtm(IFVGALCHARGING PV MP PP                                CHARG PMP RM Styhi GEAR OL COOLER 0    MISCELLANEOUSSEAUNQ ANO COOUNQ I          A(DOUARY    587.00    E CENTRIFUGAL EAST CENTRIFUGALCHARGNQ PUMP PP-                              CHARQ PMP Rooll 50E LUBE OL COOLER 0    MISCEL(hNEOVS SEAUNG ANO COOUNQ I        A(DOUARY  587.00      W CENTRIFUGAL WEST CEIARIFVQALCHARGNQ PUMP PP-                                CHARQ PMP RM 50W LUBE OIL COOLER 24f E<7~        0    QESEL COMBUSIIOH AIR I AB EMERGENCY      AUXL/ARY  587.00    AB EMER DSL GEN QESEL NORTH COMBVSAOH AIR                                        RM AFTER COOLER 0    QESEL COMBUSTION AIR/ABEMERGENCY          AIDOUARY  587.00    AB EMER DSL GEN QESEL SOUTH COMBVSAON AIR                                        RM 24(ENWRAP>                          AFTER COOLER 24f &474DM      0  QESEL COMBUSTION /UR I CO EMERGENCY        AUXIUARY  587.00    CD EMER OSL GEN QESEL NORTH COMBVSllCN AIR                                        RM AFTERCOOLER 0  QESEL COMBVSAON AIR I CO EMERGENCY        AIDOUARY    587.00    CDEMERDSLGEN QESEL SOUTH COMBVSlloN HR                                        RM 12        24'                            AFIER COOLER BORON MAKEVP(GVGSl I SOUTH BORIC      AUXIUARY    587.00
                                                                                  ~Y BORIC AGIO STOR ACID BLENDER                                          TANKAREA 21    ~
1    24T-107kB        0    QESEL FUEL CXL I AB EMERGENCY QESEL                  587.00    AB EMER OSL GEM FUEl OL DAYTANK                                            RM 2    24T.1 074D      0  QESEL FUEL OIL I CO EMERGENCY QESEL      AVXIUARY    SS7.00    COEMERDSLGEN FUEL OIL DAYTANK                                            RM 24T 110AB            QESEL LUBE QL/AB EMERGENCY DIESEL        AVXIUARY    587.00    AB EMER DSL GEN LUBE OIL COOLER                                            RM 24T 110CO            QESEL LUBE OL I CD EMERGENCY QESEL        ALDOUARY    587.00    COEMERDSLGEN LUBE Otl COOLER                                            RM 24T 115AB      0    QESEL LUBE OL I AB EMERGENCY DIESEL      AVXIUARY    579.00    AB EMER DSL LUBE LUBE OIL SUMP TANK                                        OtL PIT 24T 115CD      0    QESEL LUBE OL I CO EMERGENCY QESEL        AVXIUARY    579.00    CO EMER DSL LUBE LUBE OII. SUMP TANIC                                      OIL Pfy 247 131~              QESEL JACKET WATER I AB EMERGENCY        htDOUAftY  587.00    ABEMEROSLGEN QESEl JACKET WATER COOLER                                        RM 24T.1 31 4D          DIESEL JACKET WATER I CD EMERGENCY      AVXIUARY  587.00    CD EMER DSL GEN QESEL JACKET WATER COOLER                                        RM 24T 13348            QESEL JACKET WATER I AB EMERGENCY        AUXIUARY
                                                                                  ~Y 587.00    AB EMER OSL GEN QESEL JACKET WATER SVRGE TANK                                      RM 24T 133CD      0    QESEL JACKET WATER I CD EMERGENCY                  587.00    CD EMER DSL GEN QESEL JACKET WATER SURGE TANK                                      RM 24T 13448            DtESEL JACKET WATER I AB EMERGENCY      AVXIUARY  587.00    ABEMERDSLGEN DIESEL AIDOUAAYJACKET WATER HEATER                                      RM 2      24T 134CO      0    QESEL JACKET. WATER I CD EMERGENCY        AVXIUARY  SS7.00    CD EMER DSL GEN QESEL AUXILIAItY JACKET WATER HEATER                                    RM AN 247.1 41~1              QESEL STARTINQ AIR I AB EMERGENCY      AVXIIJARY  SS7.00    AB EMER DSL GEN QESEL STARTNG AIR RECBVER &#xb9;1                                      RM 24T 141~                QESEL STARTNG AIR I AB EMERGENCY        AUXIUAI(Y  587.00    ABEMERDSLGEN DESEL SyhfAIMG AtR RECBVER &#xb9;2                                      RM 24T 141401            QESELSTARTNG AIR/CD EMERGENCY          AUXLIARY    587.00    CD EMER OSL GEN QESEL STAR1lNG AIR RECBVER &#xb9;1                                      RM 24T.1 414D2    0      QESEL STARTNG AIR I CO EMERGENCY        AVXIUARY    587.00    CD EMER DSL GEN DtESEL STARTNG AIR RECEIVER &#xb9;2                                    RM 21        12        2-TK-10      0      LElDOWM(GVGS) I REACTOR COOLANT        AVXIUARY  009.00    VOL CTRL TANKRM LETDOWM VOLUMECONTROL TANK 12        2-TK-11              BOROM NJECAOM I BORON NJECTIOtt        h(DOUARY  012.00    BORON NJ TANKRM TANK 12      2.TK-1 2S    0      BORON MAKEUP (GVCSl I SOUTH BORIC      ALDOUARY  587.00      BORIC AGIO STOR ACID STORAGE TANK                                        TANKAREA 12      2.1K.150            DIIANS, MISCELLANEOVSI MAINSTEAM        AUXIUARY  eXLOO      MM STM UNES VERT lEADS COMOEMSATIOM DRAINTANK                                  PIPE CHASE 12                    0      CQtlKttSATE STORAGE TANKSUPPLY I        GROUNDS    009.00        NNER PLANT 2.1'.TK~                  CONDENSATE STORAGE TANK                                      GROVMDS 12                    0        REFVEUMG WATER STORAGE TANK          GROUNDS    009.00    REFUEL WIR STOR SVPPLY/REFVEUNQ WATER STORAGE                                    TANKAREA TANK 12                    0          COMPONENT COOUNG WATER I          AVXIUARY  050.00        050 HALLWAY COMPOHEMT COOUNG WATER SURGE 2.1K'.TICTIN                          TANK 0    COMlROL ROOM AIR CONDAloMNG CH        tll htDOIJARY  050.00    CTRL RM AIR WATER I CONTROL ROOM AIR CONOfl'M CCMomoNNQ NoRTH CHrll warm EXPANSCM TANK 2.1&#xc3;.70S          COMIROL ROOM AIR COMOfTlOMINGCHtLL        AUXLIARY  050.00    CTRL RM AIR CONQT WATER I CONTROL ROOM AIR                                        RM CCNDAloNNQ SOUTH CHtLLWATER EXPAMSOM TANK
 
APPENDIX C DONALD C. COOK NUCLEAR PLANT - UNIT 1 SAFE SHUTDOWN EQUIPMENT LIST (SSEL}
FOR RELAY REVIEW
 
Donald C. Cook Nuclear Plant - Unit t SSEL Certification:
The information identifying the equipment required to bring the plant to a safe shutdown condition on this safe shutdown equipment list is, to be the best of our knowledge and belief, correct and accurate.
Name                        SiciSnure                    ~Da e B. A. Svensson Operations G. P. Arent Operations J. V.. Ruparel                        .V.
Systems H. W. Young                                                        /8  ~5  5's Systems R. C. Steele Electrical T. R. Satyan Sharma                                                lz. IS gS Project Manager
 
1/5/96 6:53 PM                        DONALD C. COOK NUCLEAR PLANT UNIT 1          &#xb9;                                  Page      &#xb9;2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR RELAY REVIEW Equip      Train  Equipmenl ID                                                      Building  Floor Bev      Room or Row Cd 0          12  14TVACFD-1      0      COHlRQL ROOM YE%RATIONI PLANT        U-T AVXIUARY    850.00      PLANT PROCESS PROCESS COMPUTER ROOM                                            CMPTR RM VENTRAllOONEXHAUST NORlH RRE DAMPER 12    146t~2          0      CONTROL ROOM VENBLAllONI PLANT      U.l AVXIUARY    650.00      PLANT PROCESS PROCESS COMPVlER ROOM VENTRAllON                                        CMPTR RM EXHAUST SOUTH FIRE DAMPER 12                    0                                I CONTROL ROOM VENBLATlON CONTROL        U 1 AVXIUARY    850.00      PLANl'PROCESS ROOM VENT VHff8  HV~1      AND HV                                    CMPTR RM
                                      ~  ACRh4 TD PLANT PROCESS COMPUTER ROOM FIRE DAMPER 141V~D-1        0          QESEL ROOM VENBLAllQN AB I        V.T AVXRIARY    587.00    AB EMER DSL GEN EMERGENCY QESEL GENERATOR ROOM                                              RM YENBLATIOHSUPPLY FIRE DAMPER 141V47GSFD-2    0          DESEL ROOM VENTRATIONI CD        U.1 AVXIUARY    587.00    CD EMER DSL GEN EMERGENCY DESEL GENERATOR ROOM                                              RM VENTRAlmSUPPLY FIRE DAMPER 1+TV47GX+D.1  '              QESEL ROOM VENBLAllON AB I        U 1 AVXIUARY    587.00      AB EMERGENCY EMERGGENCY DESEL GENERATOR ROOM                                    DESEL GENERATOR VENTRATKHEXHAUST FIRE DAMPER                                            ROOM 0          2  14TVCKX4q7-2    0          DESEL ROOM VENBLAllOHI CD        U.T AUXIUARY    587.00    CD EMER DSL GEN EMERGENCY QESEL GENERATOR ROOM                                              RM VENTRABQN EXHAUST FIRE DAMPER
,0            2    143ME44E      0    ESWI EAST ESW PUMP PP.7E DSCHARGE      SCREENHOUSE      591.00    E ESSNTL SERV WIR STRANER                                                  PMP RM 147ME44W        0          ESW I WEST ESW PUMP PP.TW        SCREENHOVSE      591.00      W ESSNTL SERV DSCHARG E STRAINER                                          WTR PMP RM 1477 TOGAS                                                      GROUNDS      609.00        NNER PLANT GROUNDS 0          2    141T 100CD              DESEL COMBUSTION AIR I CD EMERG        GROUNDS      609.00        NNER DESEL AIR WTAKE FILTER                                              RAN'ROUNDS 14lT.11 SAB              QESEL UJBE DLI AB EMERG DESEL          AVXIUARY      579.00    AB EMER OSL LUBE BYPASS LUBE DL FILTER                                            QIL prT 14T 118CD      0        QESEL UIBE DLI CD EMERG QESEL          AVXIUARY      579.00    CD EMER DSL LUBE BYPASS LUBE DL FILTER                                            OIL PIT ELECIRICALQSTTOBUBON 600VAC I        AVXIUARY      587.00        587 HALLWAY 600VAC MCC ABA ELECTRICAL QSTRIBVTER, 600VAC I 600      AVXIUARY  -  587.00        587 HALLWAY VAC MCC 1*BD 1          1                              ELECIRICALDSTRIBUBQH 6OOVAC I        AVXIUARY      587.00    AB EMER DSL GEN 800VAC MCC ABD.A                                                RM 1          1                    0        ELECBIICALQSTRIBVBQH 6OOVAC I        AVXIUARY      587.00    AB EMER DSL GEN 1,        2 800VAC MCC AIRES ELECBLICALQSTRIBVTIOH MOVACI 60OVAC MCC ABDC AVXIUARY      587.00 RM CD EMER DSL GEN RM 1          2                              ELECTRICALDSTRIBVBQN 800VAC I        AVXIUARY      609.00    4KV RM 6OOV SWGR 60OVAC MCC ABDQ 1          1                    0          ELECTRICAL DSTRIBVBQN 600VAC  I      AVXIUARY      587.00        587 HALLWAY 600VAC VCC ABYE
      -                                          60OV AC DSTR I MCC 1 1          2 1~
1WBV41      0 0
ABYE ELECTl\ICALQSTRIBVTIQN OXNACI AVXII.IARY AVXIUARY 587.00        587 HALLWAY 833 HALLWAY l~
633.00 600VAC MCC AMA 1          2                    0          ELECTRICAL DSTRIBVBQN 600VAC  I    AVXIUARY      8M.OO        633 HALLWAY 600VAC MCC AlkD 1,          1      1  ABC                  ELECTRICAL QSTRIBUBON 600VAC I 800VAC MCC AZOIC AVXIUARY      809.00        609 HALLWAY 1          1      1AZV.A                ELECTRICAL QSIRIBVTION 60OVAC I      AUXIUARY      587.00        609 HALLWAY 60OVAC VCC AZVA 1          1      1~CA                  ELECTRICAL DSTRIBVBQH 60OVAC    I    AVXIUARY      813,00    4KV RM MEZZANINE 800VAC MCC EZCA 1~CB                  ELECTRICAL DSTRIBVBQN 6OOVAC I        AVXIUARY      813,00    4KV RM MEZZANNE 6OOVAC MCC EZC 8 1          2        1~DC                  ELECTRICAL DSTRIBVBON 6OOVAC    I    AUXILIARY    613.00    4KV RM MEZZANINE 6OOVAC MCC EZC4 1~GO                  ELECTRICAL DSTRIBVBON 60OVAC I        AVXIUARY      O'I3.00  4KV RM MEZZANINE 60OVAC MCC EZC41 ELECTRICAL QSTRIBVBQN. 600 VAC I 600 VAC MCC 14rSA SCREEN HOUSE    594.00      TRAVELNG MCC UPPER RM
                                                                                                                            ~N 1          2                                                            I ELECTRICAL DSTRIBVTER, 800VAC 600    SCREENHOVSE      594.00      TRAVEUHG SCRN VAC MCC 14rSQ                                          MCC UPPER RM 2          1        1  llhl              ELECTRICAL QSTRIBVBON, 6OOVAC  I    AVXIUARY      609.00    4KV RM 6OOV SWGR REACTOR RQO CONTROL SOUIH MOTOR.
GENERATOR SET CRDMG-1 S SUPPLY BREAKER 1.11A1 0      0    EU~ICALDSTRIBUBQN. 6OOVAC I WEST          AVXIUARY      609.00    4KV RM 6OOV SWGR TVRSNE AUXIUARYCQOLNG WATER PUMP PP.14W SUPPLY BREAKER 1.1 1A11                ELECTRICAL QSTRIBVTION 60OVAC I      AVXIUARY      609.00    4KV RM SXIV SWGR 60OVAC BVS 11 A SUPPLY BREAKER 1  11A13              ELECTRICAL DISTRIBVBON, 6OOVAC  I    AVXIUARY      609.00    4KV RM 6OOV SWGR 600VAC MOTOR CONTROL CENTER ALLA1 SUPPLY BREAKER 1  11A4              ELECTRICAL DSTRIBVBOH, 6OOVAC I      U.1 AVXIUARY    609.00    4KV RM 6OOV SWGR SOUTH PLANTUGHBNG TRANSFORMER TR.
LTGOS SVPPLY BAEAKER 1  11AT              ELECTRICAL DSTRIBVBQH, 6OOVAC    I    AVXIVARY      609.00    4KV RM ~ 600V SWGR SERVICE BVRDNG UGHTING TTTANSFQIMER 12.TR4.TG.1 4 SUPPLY BREAKER
 
1/5/96 6:53 PM                      DON/LLDC. COOK NUCLEAR PLANT UNIT IT 1                                        PageIT 3 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW Equip      Tain                              System I EqiNpment Oeaxipbon        Buildina Boor Elev      Room or Row Col 1.11A9    0    ELlXZRICALQSTRIBtflIQN. NOVACITSC        AUXIUARY    009.00    4KV RM 600V SWGR VHNTERRVPTABLEPWR SOURCE EMER FEED CONSTANT VOLTAGETRANSFORMER 12.TSGUPSQVT SUPPLY BREAKER 1  11810  0    ELECITtiCALQSTRIBVllQH. OOOVAC I PLANT      ALDQUARY    N9.00    4KV RM  OOOV SWGR HR COMPRESSOR OMELET SUPPLY BREAKER 1  11811            ELEClRICALQSlRIBVBOH NOVAC I          AUXIUARY    009.00    4KV RM NOV SWGR OOOVAC BUS 118 SUPPLY BREAKER 1  11812  0        ELEClHICALQSTRIBtflIOM,NOVACI          AUXIUARY    N9.00    4KV RM NOV SWGR SOUTH NOILESSENTIAL SERVICE WATER PUMP PP4S SUPPLY BREAKER 1  71815            ELECTRICAL DSTRISVllQM, 000VAC I      AUXIUARY    009.00    4KV RM  OOOV SWGR IURSNE ROOM INDUCllONHEATNIQ, STRESS REUEF AND BOLT HEATERS SUPPLY BREAKER 1  1185        ELECTRICAL QSTRIBtfltOM, NOVAC I EAST    AUXIUARY    N9.00    4KV RM NOV SWGR 1184 12~
AND WEST AUXNJARYBINLQNQ CRANES AND 124yLLOW SUPPLY BREAKER ELEClRICALQSTRIBtfltOH OOOVAC I 1                                                          AUXIUARY    009.00    4KV RM 000V SWGR 800VAC MCC AZOIC SUPPLY BREAKER 1  1185    0        ELECTRCAL QSTRJBtfllOM, OOOVAC I      AUXIUARY    009.00    4KV RM  OOOV SWGR NOVAC MOTOR CQMlROL CENTERS TBG-BE ANO TSP4IW SUPPLY BREAKER 1  1188        ELECTRCAL QSTRIBUDQM, 000VAC I EAST        AVXIUARY    009.00    4KV RM NOV SWGR lURSNE AVIARYCQOUNG WAlER PULIP PP-1 4E SUPPLY BR EAKER 1  1187        ELECTRICAL QSIRIBtflIQM,NOVAC I PLANT      AUXIUARY    N9.00    4KV RM NOV SWGR HEATINQ BDLER FORCED DRAFT FAN 12-OME.1 OMAH SUPPLY BREAKER 1  1188    0        ELEClHICALQSTRIBtfllOH, OOOVAC I      AUXIUARY    N9.00    4KV RM NOV SWGR MAKEUP PLANT VACUUMDEGASFIER 2ND STAGE VACUUM PUMP 124tPMM SUPPLY BREAKER 1-11C1      0        ELECIRICALDISTRIBVIIQNOOOVAC I        AUXNJARY    009.00    4KV RM  OOOV SWGR 800VAC BUS 11C SUPPLY BREAKER 1  11012    0        ELEtflRICALQSTRIBUTIOH. 600VAC I      AUXIUARY    009.00    4KV RM NOV SWGR NORTH SPENT FUEL PTT PUMP 12~Nt M SUPPLY BREAKER 1    11C13            ELECTRICAL QSTI tIBUTIOM000 VAC I      AVXIUARY    009.00    4KV RM 600V SWGR CNTCVIT BREAKERZOOV FOR RECRIPROCAllNQ CHARGING PUMP        14K 49 1  11C14    0        ELECIRICALDSTRIBtfltON, 600VAC I      AUXIUARY    009.00    4KV RM  OOOV SWGR 800VAC BUS 11C SPARE CNICUITBREAKER 1.11CIS      0        ELECTRICAL QSTRIBtflIOM, OOOVACI      AVXNJARY    009.00    4KV RM  OOOV SWGR TECHNCALSUPPORT CENTER UNNIIERRUPTABLEPOWER SUPPLY NORMAL      SUPPLY BREAKER 1  11C10    0        ELEClRICALQSTRIBVTIOM, OOOVAC I        AUXIUARY    009.00    4KV RM  OOOV SWGR 000VAC MOTOR CONTROL CENTERS lBC-CS ANDlBQCW SUPPLY BREAKER 2,                1  11C17    0        ELEClRICALQSTRIBVllON, NOVAC I          AUXIUARY    N9.00    4KV RM NOV SWOR NORTH ttQH4%SEMTIALSERVICE WAlER PUMP PPSN SUPPLY BREAKER ti11C18              ELECTIBCALIXSTRIBUTlQN,OOOVAC I        AVXIUARY    009.00    4KV RMi OOOV SWOR lURSNE BUNJXNQ 24IXSO TDH OVERHEAD CRANE 124yLL1 SUPPLY BIIEAKER 1  11C2    0        ELEClRICALDSTRIBtflKyN,600VAC I        AVXNJARY    009.00    4KV RM  OOOV SWGR CQNTHNMENTPOLAR CRANE QMQ SUPPLY BREAKER 1 11CO      0        ELECTRICAL, DISTRIBtfltON. OOOVAC I    AVXNJARY    N9.00    4KV RM  OOOV SWGR 000VAC MOTOR COHTROL CENTER ALLC1 SUPPLY BREAKER 1.1 'IC4              ELECTRICAL QSIRI BUItQM, 000VAC I      AUXNJARY    009.00    4KV RM - NOV SWGR CRCULATNIGWATER TRAVEUNG SCREENS NORTH WASH PUMP 12~.1 SN SUPPLY BREAKER 1 '11CS              ELECIRICALDISTRBtflION. NOVACI        AVXIUARY    N9.00    4KV RM - NOV SWGR MAKEUPPLANT VACUUMDEGASFIER Sl'ANDBYVACUUMPUMP 124VMW SUPPLY BREAKER 1  11CT              ELECTRICAL DISTRIBVIIOM,OOOVAC I      AUXIUARY    609.00    4KV RM NOV SWGR OOOVAC BUS 11C SPARE CNTCUIT BREAKER 1.11CO                EU~ICALQSTRIStfllON. OOOVAC I          AVXIUARY    009.00    4KV RM -OOOV SWGR SERVICE BUIUXNGAND COMTHHMENT STANDBYUGHTNQ TTTAMKOAMER TR4TQ-8 SUPPLY BREAKER 1  1109          ELEClRICALDSTRIBtflIQM.NOVAC I MAIN        AUXNJARY    609.00    4KV RM - OOOV SWGR AND SPARE TRANSFORMER AUXIUARIES NORMALDISTRIBtflIQMCASNET TCSM SUPPLY BREAKER 1.1101                ELECIICALQSTRIBtflIQN NOVAC I          AUXIUARY    009.00    4KV RM  OOOV SWGR 800VAC BUS 110 SUPPLY BREAKER 1  11010    0        ELECITOCAL QSTRIBtflyQM, OOOVAC I      AUXIUARY    009.00    4KV RM  OOOV SWGR NORTH PthMT UGHTTNQ TRANSFORMER TRJ.TOM SUPPLY BREAKER 1  11015    0        ELECTRICAL DSlRIBUDQN, OOOVAC I        AVXIUARY    N9.00    4KV RM  OOOV SWGR REACTOR ROO CONTROl. NORTH MOTOR.
GENERATOR SET CRDMG-1N SUPPLY BREAKER
 
1/5/96 6:53 PM                        DONALD C. COOK NUCLEAR PLANT UNIT 0 1                                                        Page//4 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR REIAY REVIEW Equip      Trein  Equipment ID              System  / Equipment esoripoon                        Buddiny  Boor Elev    Room or Row Col 2          2          1 7188            ELECTRICAL QSTRIBtmOM, 600VAC I                        AUXILIARY  609.00  4KV RM 600V SWGR CONTANJMENT UGHRMG TRANSFORMER 7R4.TG 10 SUPPLY BREAKER 1.11DQ    0    ELECTRICAL QSTRIBUTION, 600VAC I MAIN                      AUXIUARY    609.00  4KV RM 600V SWGR ANO SPARE TRAMSFORMEIT AUXILIARIES EMERGENCY QSTRIBUTION GANNET TCSE SUPPLY BREAKER 142&Th      0    REACTOR TAP BREAKER I REACTOR ROO                          AUXNJARY    609.00      CRO EQUIP, RM CONlROL TRANt 'A'EACTOR TRIP BYPASS CIRCUIT BREAKER 0    RCO CONTROL AND NCSJRUMEMTATION                      I  AUXNJARY    609.00      CRO EQUIP RM REACTOR ROO CONTROL TRAIN 'E R EACfOR TAP BYPASS CNJCUIT BREAKER 1424tth            ROO CONTROL ANO NJSTRUMEMTATIONI                          AVJ0tJARY  609.00      CRO EQUIP RM REACIDR ROO COMlROL TRAIN TRIP C&#xc3;tCUIT BREAKER        'A'EACTOR ROD CONTROL AND NJSTRVMEMTATION                      I    AVXIUARY    60Q.OO      CRD EQUIP RM REACTOR ROO CONTROL 1RIP CtRCUIT BREAKER TRAW%'EACTOR 1.T11A1    0      EU~ICALQSTRIBUTION, 4160 VAC                      I    AUXNJARY    609.00    4KV RM - AB 4KV SOUTH SAFETY 9/JECllON PUMP PP-26S                                                    SWGR SVPPLY BREAKER 1  T11A10    0  ELECIRICALQSTRIBVRON 4160VAC I 600V                        AUXNJARY    609.00    4KV RM - AB 4KV BUS 11A SVPPLY TRANSFORMER TR11A                                                      SWGR SUPPLY BREAKER 1.T11A11    0    ELECIRICALQSmStmON 4160VAC I AB                          AUXNJARY    609.00    4KV RM AB 4KV EMERG QESEL GENERATOR TO 4KV BUS                                                      SWGR T11A SUPPLY BREAKER 1  T11A12    0      ELECTRICAL QSIRIBUTION 4160 VAC I                      AUXNJARY    609.00      4KV RM AB 4KV CIRCUIT BREAKER FROM 69kV TO BUS 711A                                                    SWGR 1.T11A3    0      ELECTRICAL QSTRSVJION. 4160 VAC I                      AUXILIARY  609.00      4KVRM A84KV WEST COMfAJNMENTSPRAY PUMP PP4W                                                        SWGR SUPPt.Y BREAKER 1  T11A6    0  ELECTJUCAL QSttuBUTION ~ 4160 VAC/4KV                      AUXIUARY    609.00      4KV RM AB 4KV BUS T11A TO 4SV PRESSURIZER HEATER                                                      SWGR BUS SUPPLY XFMR TR11A PHA SUPPLY BRKR 1.T11A9          ELECTRICAL DSTRIBUJION, 41 60VAC I 4KV                    AVXNJARY    609.00      4KV RM AB 4KV BUS 1A TO 4KV BUS 711A TIE BREAKER                                                    SWGR 1.71181          ELECTRICAL QStt tIBUJION, 4160VAC I 4KV                    AVXNJARY    60Q.00      4KV RM AB 4KV BUS 18 TO 4CV BUS T118 TIE BREAKER                                                    SWGR 1.T1182    0      ELECTRICAL QSIRSVJIOM, 4160VAC, I                      AUXNJARY    609.00      4KV RM AB 4KV CNTCUIT BREAKER FROM 69kV BUS TO BUS                                                    SWGR 7118 1  T1184    0    ELECTRICAL QSTRIBUJION 4160VAC/ AB                        AUXNJARY    eXI.00      4KV RM AB 4KV EMERG DIESEL GENERATOR TO 4KV BUS                                                      SWGR T11 SUPPLY BREAKER 1  T11C1        ELECTRICAL QSJRIBVJION, 4160VAC I 4KV                      AUXIUARY    609.00      4KV RM CO 4KV BUS 1C TO 4CV BUS T11C 71E BREAKER                                                  SWGR 1.711C2    0    ELECTRICAL QSTRIBVJION 4160 VOLTS I                      AVXIUARY    609.00    4KV RM CD 4KV CRCVIT BREAICER~ FROM 69kV TO BUS                                                      SWGR T11C 1  711C3    0    ELECTRICALQSTRIBVllON4160VAC I CO                          AUXJUARY    609.00    4KV RM CD 4KV EMERG IXESEL'ENERATOR TO 4CV BUS                                                      SWGR T11C SUPPLY BREAKER 1  T11D1          ELECTRICAL QSIRIBUTION, 4160 VAC I                      AUXIUARY    609.00    4KV RM CO4KV CRCUIT BREAKER 4kV FROM 69kV FEED TO                                                    SWGR BUS T11D 1.T11D12    0  ELECTRICAL QSTRSUTION, 4160VAC I 4KV                        AUXNJARY    609.00    4KVRM CO4KV BVS 10 TO 4KV BUS 711D TIE BREAKER                                                    SWGR 1.711D2      0  ELECTRICAL DSTRIBUllON 4160VAC I 600V                      AVXIUARY    609.00    4KV RM CO 4KV BUS 11D SUPPLY TRANSFORMER IR11D                                                      SWGR SUPPLY BREAKER 1  T1104  0      ELECIRICALQSTRIBVllON. 4160 VAC I                      AUJQCXJARY  609.00      4KV RM CO 4KV EASl'ONTAINMENTSPRAY PUMP PP4E                                                        SWGR SUPPLY BREAKER 1.711DS            ELECTJ IICALDSTRIBVJION, 4160 VAC I                    AUXIUARY    609.00      4KV RM CD 4KV NORTH SAFElY NJ ECTION PUMP PP-26M                                                    SWGR SUPPLY BREAKER 1  T11D8        ELECIRICALQSTRIBUllON 4160VAC I CO                        AVXIUARY    60Q.00      4KV RM CD 4KV EMERG QESEL GENERATOR TO 4KV BUS                                                      SWGR T11 0 SUPPLY BREAKER 1.T11DQ    0  ELEClRICAL QSTRIBURON, 4160 VAC I 4KV                      AUXNJARY    609.00      4KV RM CO 4KV BUS 7110 TO 480V PRESSURI2ER HEAlER                                                    SWOR BUS SUPPLY XFMR 7R11PHC SUPPLY BR KR 0    120V CTRL RM NJSTRUMEMfhtlON DSTR I                        AUXNJARY    609.00    4KV RM 600V SWGR 10KVATRANSFORMERCONST ANT VOLTAGE 1~IOJJCVT      0    120VAC QSTRIBUAON I 120V AC CR NST                        AUXIUARY    609.00    4KV RM 600V SWGR DISTR CHN ISOL CONT. VOLTTRANSP 14JtlDJIH Vt  0    120V CtRL RM NJSTRUMENTATION QSTR I                        AVXNJARY    609.00    4KV RM 600V SWGR 10KVA ISOIJMITER 4XJNSTANf VOLTAGE-TRANSFORMER 120V CTRL RM INSTRVMENfhtlONDStR I                        AUXIUARY    609.00    4KV RM ~ 600V SWGR 10KVA ISOUMITER. CONSTAMf VOLTAGE.
TWWSFORMER 0      DESEL GENERATION. CONTROL ANO                          AUXIUARY    587.00    AB EMER DSL GEN IMSTRVMENI AB EMERGENCY DIESEL                                                          RM GENERATOR OME.1 50 AB FIELD FLASH CIRCUIT TRANSFORMER
 
1/5/96 6:53 PM                            DONALD C. COOK NUCLEAR PLANT UNIT 1          &#xb9;                                  Page &#xb9;5 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW Eqw'p      Train    Equipment IO                                                    Bruldiny    Floor Bev      Room or Row Col A          2    14GCOFFCKT          0      DESEL GENERABCM, CONTROL AND          AVXIUARY      587.00    CO EMER OSL GEN NSTRUMENICO EMERGENCY IXESEL                                              RM GENERATOR OME.1 50CD FIELD FlASH CKT TRANSFORMER 1  TR11A    0        ELECTRICALQSBIISVBON OOOVAC I        AUXLIARY      000.00  AKVRM 000V SWGR 60OVAC BUS 11A SUPPLY TRANSFORMER 1.TR118      0        ELECTRICAL QSBISIVBON IOOVACI        AUXIUARY      000.00  AKVRM NOVSWGR 6OOVAC BVS 118 SUPPLY TRANSFORMER 1.TRl1C      0        ELECTRICALQSBVBVBON 000VAC I          AVXIUARY      ON.00      AKV RM CO AKV 6OOVAC BUS 11C SUPPLY TRANSFORMER                                        SWGR 1.TR110      0        ELECTRICAL OISTRISUBOM OXNAC  I      AUXIUARY      600.00  AKVRM 000VSWGR 00OVAC BUS 11D SUPPLY TRANSFORMER 1 JrP-1 OE    0              ccw I EAsT ccw pUMp            AUXIUARY      009.00        609 HALLWAY 1~ 1OW        0              COW I WEST COW PUMP            AUXIUARY      609 00        009 HALLWAY 1JrP.20M      0        SAFElY NJECBON I NORTH SAFETY        AUXIUARY        587.00    N SAFETY NJ PMP NJECBON PUMP                                                  RM TR -28S      0        SAFETY NJECBON I SOUTH SAFETY        AUXIUARY        587.00    S SAFElY NJ PMP NJECTKN PUMP                                                  RM 0    AUXFEEDWATERI EAST MOTOR DRIV AUX        TURBINE      501.00      E MOTOR DRNEN FEEDWATER PUMP                                          AUXFDWTR PU 0    AVXFEEOWATER I WEST IAOTOR ORNEN        TURBINE      501.00      W MOTOR DRNEN AUXFEEDWATER PUMP                                          AUX FOWTR PU 12                      0      AUX FEEDWATER I TVRSNE DRN AUX          TVRBNE        501.00        TB DRIVEN AUX FEEDWATER PUMP                                            FDWIR PMP 1 JtP~T        0      CVCSIBORCACDSIORAGETANKS              AUXIUARY      58700      BORIC ACD STOR lltANSFER PUMP 1                                              TANK 1~~2          0        CVCS I BORIC ACD STORAGE TANKS        AUXIUARY      587.00      BORC ACID ST OR TRANSFER PUMP 2                                              TANK 12          1~~        0    CVCS I RECPROCABNG CHARGING PUMP        AUXIUARY      587.00      RECIPROCATING CHRG PMP RM 1 JrP40E      0      CVCSI EASf CENTRFUGAL CHARGNG          AUXIUARY      587.00    E CNlRFGL CHARQ PUMP                                                  PMP RM 14%40W        0      CVCSIWESf CTMHIFUGALCHARGNG            AUIOUARY      587.00      W CENTRIFUGAL PUMP                                              CHRG PMP RM 1 JrPAI2N    0        CONTROL ROOM hrC CHllLWATER I        AVXIUARY      0QLOO      CTRL RM HR COND COMlROL ROOM NORTH CIOLLWATER                                            RM CRCUthTCM PUMP 0        CONTROL ROOM AlC CIOLLWATER I        AUXIUARY      850.00    GIRL RM AIR COND CONTROL HC SOUTH CI8LLWAlER                                              RM CRCUlhllON PUMP 14T 106481        0    DESEL FUEL QL I AB EMERGENCY DIESEL      AUXIUARY      587.00    AB EMER OSL FUEL FUEL orLTRANsFER pvMp 61                                        OIL XFR PMP 14T 106482        0    DESEL FVEL QL I AB EMERGENCY DESEL        AUXNJARY      587.00    AB EMER DSL FUEL FUEL QLTIIANSFBtPUMP 62                                        DL XFR PMP 14T 1064D1        0    DESEL FUEL DLICD BAERQ QESEL FUEL        AVXIUARY      587.00    CD EMER OSL FUEL QL TltANSFER PUMP 1                                        CXL XFER PMP 14T.1 064D2      0    QESELFVELOLICDEMERG DIESELFUEL          AUIOUARY      587.00    CD EMER OSL FUEL QL TRANSFER PUMP 2                                          OIL XFER PMP 14T.111~        0      TXESL LUBE QLIAB BAERG DESEL LUBE      AVXIUARY      570.00    AB EMER DSL LUBE QL SEFORE ANO AFTER PUMP                                            OIL PIT 147.11140        0    DESEL LUBE QL I CO EMERG QESEL LUBE      AUXIUARY      570.00    CO EMER DSL LUBE QL BEFOREANO AFTER PUMP                                            OIL PIT 14T 11MB        0    QESEL LUBE OL I AS EMERQ DIESEL LUBE    AUXIUARY      570.00    AB EMER OSL LUBE OIL HEATER OT.1 1IMB PUMP                                          Olt. PIT 14T 11740        0    QESEL LUBE QLICO EMERQ DESEL LUBE        AUXIUARY      570.00    CO EMER DSL LUBE OIL HEATER OT.11640 PUMP                                          OIL PIT 14T 11948        0    DIESEL LUBE QL I AB EMERG DIESEL LUBE    AUXIUARY      579.00    AB EMER OSL LUBE OIL FLTER OT.118 AB PUMP                                          OIL PIT 14T.11940        0        DESEL LUBE QL I CD EMERG QESEL        AUXIUARY      579.00    CO EMER OSL LUBE BYPASS LUBE QL FLTER (GT 1184D)                                        QL PIT PUMP 14T 130481        0        DESEL JACKET WATER I AB EMERG        AUXIUARY      587.00    AB EMER DSL GEN DIESEL JACKET WATER PUMP 1                                            RM 14T.1 30AS2      0        DIESEL JACKEf WATER I AB EMERG        AUXNJARY      587.00    AB EMER OSL GEN DIESEL JACKET WATER PUMP 2                                            RM 14T.130401      0        QESEL JACKET WATER I CO EMERG        AUIOUARY      587.00    CD EMER OSL GEN IXESEL JACKET WATER PUIAP 1                                          RM 14T 130402      0        QESEL JACKETWATERICD EMERG            AUXIUARY    "
587.00      CO EMER DSL GEN QESEL JACKET WATER PUMP 2                                              RM 147 135AB        0        DESEL JACKET WATER I AB EMERG        AVXAJARY      587.00      AB EMER DSL GEN QESEL AUXJACKET WATER PUMP                                              RM 14T.1 3540      0        QESEL JACKET WATER I CO EMERG        AUXNJARY      587.00      CO EMER OSL GEN DBSEL AUXJACKET WATER PUMP                                              RM 12JrP.1 0    0              ccw I spARE ccw pUMp            AUXII.IARY    009 OO        009 HALLWAY 12      12~%1M        0        SPENT FUEL PIT COQUNGICLEANUP I      UNIT N I AUX  009.00        SPENT F VEL PIT NORTH SPENT FUEL PIT PUMP                                    HEAT XCHGR RM IJnr45E                        RHR I EAST RHR PUMP 1~~                            RHR I WEST RHR PUMP AUXILIARY AVXIUARY 573 00 573.00 EAST RHR PUMP RM W RHR PUMP RM
                      'I JtP.TE    0                ESW I EAST ESW PV MP        SCREENHOUSE      591.00    E ESSMTL SERV WTR PMP RM 1~.7W          0              ESW I WEST ESW PUMP          SCREENHOUSE      501.00      W ESSNlL SERV WTR PMP RM THAIS        0            CONTHNMEMTSPRAY I EAST          AUXIUARY      573.00    E CONT SPRAY PMP CONTANMEMfSPRAY PUMP                                                RM 0            COMTANIAEMTSPRAY I WEST          AVXIUARY      573.00    W COMl'PRAY PMP CONTAINABrfSPRAY PUMP                                                RM 14RVAI0        0    CCW I DEMINBIAUZEDMAKEUP WATER TO        AUXNJARY      050.00        050 HALLWAY CCW SURGE TANK'A'.5 in HR OPERATED SHUTOFF VALVE
 
$ /S/96 6:53 PM                        DONALD C. COOK NUCLEAR PLANT UNIT N 1                                          Page II 6 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW Equip      Trein  Equipment tO                                                    Bwbiny  Fkcr Eiev      Room or Row Col 7          1      142IVk411    0  CCW I DEMWERAUZED MAKEUP WATER TO          AUXIUARY    650.00        650 HALLWAY CCW SURGE TANK'If1.5 In AIR OPERATED SHUTOFF VALVE 143CR401    0  NUCLEAR SAMPUNG I STEAM GENERATOR          AVIARY      591.00          VESIIBULE 1 SLOWDOWN SAMPLE DSR401 CQNTHNMENTISQLATlOMVALVE 0
2 BL~
NUCLEAR SAMPUNG I STEAM GENERATOR SAMPLE DSR402 CONTAINMENTIQXAllONVALVE AVXIUARY    591.00          VESTIBULE 0  NUCLEAR SAMPUNQ I STEAM GENERATOR          AUXIUARY    591.00          VESTIBULE 3 SLOWDOWN SAMPLE DSR403 CONTHNMENTISOLATIONVALVE 0
4 BL~
NUCLEAR SAMPLING I STEAM GENERATOR SAMPLE DSR404 CONTAINMENfISOLAIlONVALVE AUXIUARY    591.00          VESTIBULE 147CR410          BLOWDOWNI STEAM GENERATOR OME4 I          AUXIUARY    591.00          Sl'ARTUP BLOWDQVNCONTAWMENTIRXATlON                                          SLOWDOWN 0  BL~I              VALVE STEAM GENERATOR OME4.2 SLOWDOWN CONTAWMENfISOLATKN AUXIUARY  591.00 FLASHTANKRM SfARTUP BLOWDOWN VALVE                                            FLASHTANKR M BL~I BLOWDQWN STEAM GENERATOR OME44 CONTAINMENTISOlhIlON VALVE AUXIUARY  591.00            STARTUP BLOWDOWN FLASHTANKRM 0  SLOWDOWN I STEAM GENERATOR OME44            AUXIUARY  591.00          STAR TUP BLOWDOVNCONTAWMENTISOlhllON                                        SLOWDOWN VALVE                                            FLASHTANKRM 12      14%V~7        0  STEAM UNE DRANS I MAN STEAM LEADS          AUXIUARY,  621.00      W MAN STM STOP CONOENSAIION DRAN TANKTK.200,                                        ENCL OUTLET SHUTOFF VALVE 1+RV-247      0  AUXFEEDWAIER/WESTMOTQR ORIV AUX              TURBNE    591.00      W MOTOR DRIVEN FEEDWATER PUMP PP4W EMERQ 1 in HR                                  AUXFDWIR PV OPERATED lEAKOFF GLOBE VALVE 1~V-257      0  AUXFEEDWAIER I EAST MOTOR DRIV AVX          IURBWE    591.00        MOTOR DRIVEN FEEDWATER PUMP PP4E EMERQ 1 in AIR                                  AUXFDWTR PU OPERAIED LEAKOFF VALVE 12      1~V-25S            AUXFEEDWATER I TURBWE DRIV AUX            TURBINE'91.00          TBORNEN AUX FEED PUMP EMERG 1 In HR OPERATED                                    FDWTR PMP lEAKOFF GLOBE VALVE 12      1~414        0    I6IRQGEN (REACTOR PLANT SERVICE) I        AVXIUARY  591.00          STAR TUP NmOGEN SUPPLY TO ACCUMULATOR                                        SLOWDOWN TANKS CONTAW MENT ISQLAIlOWVALVE                                  FLASHTANKRM 12      1&RV441      0    NITROGEN (REACTOR PLANT SERVICE) I      CONTAINMENT  SRLOO        ANNULUS, QVAD2 NTROGEN SUPPLY TO ACCVMVlATOR TANKS VENT TO ATMOS. VALVE 12    144V4GR4kID-1  0    AUXBUuXNG VENTILATIONI CONlROL            AUXIUARY  609.00      4KV RM 600V SWGR ROD DRIVE EQUIP ROOM ANO NVERTER AREA VENRLhllOMRECNCULAIWQAIR WLET DAMPER 12    144V4GR4IO.2    0    AUXBVILDWGVENIILAIIONI CONTROL            AUXIUARY  M9.00      4KV RM 600V SWGR ROO DRIVE EQUIP ROOM AND NVERTER AREA VENTILATIONRE(2RCULAIINQ AIR WLET DAMPER 14RV 112          NITROGEN (REACTOR PLANTSERVICES) I      CONI'AWMENT  612,00      ACCUM TAHK1 AREA ACCUMULATORTANKOME4.1 Nf/ROGEN SUPPLY VENfVALVE 14RV.116    0  RHR  I  ACCUMULATOR TANKOME4.1 0.75 in AIR OPERATED OUTLET TO REACTOR CONTAWMENT  SRLCO        ANNULUS, QUAO1 COOLANT LOOP nt COLD LEG TEST VALVE 14RV422          NITROGEN (REACTOR PLANT SERVICES) I      CONTAINMENT  61200      ACCUM TANK2 AREA ACCUMULATORTANKOME4-2 N/IROGEN SVPLY VENT VALVE 14RV 126    0    RHR/ACCUMULATORTANKOME4 20 75 in          CONTAWMENT  596.00        ANNULUS. QVAD2 AIR OPERATED OUTLET AND SAFElY NJECIION TO REACTOR COOLANT LOOP 2 COLD LEG TEST VALVE 14RV.1 32    0    NITROGEN (REACTOR PLANT SERVICESI I      CONTAWMENT  612,00      ACCUM TANK3 AREA ACCUMULATORTANKOME44 NITROGEN SUPPLY VENfVALVE 14RV 136              RHR I ACCUMULATORTANKOME44            CONTAINMENT SRLOO        ANNULUS, QVAD3 OUTLET AHO SAF EIY WJECllON TO REACTOR COOLANT LOOP 3 COLD LEG 0.75 In AIR OPERATED TEST VALVE 14RV.142    0    NITROGEN (REACTOR PLANT SERVICES) I      CONTAINMENT 612.00      ACCUM TANK4 AREA ACCUMULATORTANKOME44 NmtOGEN SVPPLY VENT VALVE 14RV 146    0    RHR I ACCUMULATORTANKQME44 1 in        CONTAWMENT  598.00        ANNULUS, QUAO4
                                                                ~
HR OPERATED OUTLET AND SAFETY NJECDON TO REACtOR CCKXANTLOOP 4 COLD LEG TEST VALVE 14RV447            RHR I WEST RHR AND SOUTH SAFETY NJECTKN TO REACTOR                      k CONTANMENT  612.00    'V~Q.1 FAN RM LOOPS 2 AND 3 0 75 In AIR QPERAIEO TEST VALVE 14RV.1 46            RHR I EAST RHR ANO NORTH SAFETY      CQNTANMENT  612,00        HV~QI FAN RM NJECIION TO REACTOR COOlANT LOOPS 1 AND 4 0.75 In AIR OPERATED TEST VALVE 14RV.149    0    RHR/WESTRHRTO REACTOR COOLANT            CQNTAWMENT  612.00        HV~Q.I FAN RM LOOPS 2 AND 3 0.75 in HR OPERATED TEST VALVE
 
3/5/96 6:53 PM                            DONALD C. COOK NUCLEAR PLANT UNIT /I 1                                                  Pdg847 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR REIAY REVIEW Equip      Tain      Equipment ID Ches 1+V 150      0      RHR I EAST RHR TO REACTOR COOLANT                    COMTANMEMT  812.00  HV~Q1FANRM LOOPS 1 AND 4 0.75 h AIR OPERATED TEST VALVE 12          1WV-280      0      SAFElY NJECTIONI SAFElY NJECDQN                        AUXIUARY  587.00  N SAFElY INJ PMP TEST UNE SHUIDFF 0.75 h AIR OPERATED                                                RM VALVE 1WVQIO      0    RHR I EAST RHR HEAT EXCHANGER HE-17E                    AUIOUARY  809.00    EAST RHR HEAT 8 h AIR OPERATED OUTLET FLOW                                              EXCHGR RM COMIROL VALVE 12          1WVC11              RHR I RHR HEAT EXCHANGERS BYPASS                      AVXIUARY  809.00    EAST RHR HEAT FLOW 8 In hsl OPERATED CONTROL VALVE                                            EXCHGR RM 0      RHR I WEST RHR HEAT EXCHANGER HE                        AVXIUARY  809.00  WRHRHEATXCHGR 17W 8 h AIR OPERATED OVIIETFLOW                                                  RM CONTROL VALVE 12          1 JRV40      0      BORON NJECAOMI BORON WJECDOH TO                      CONTANMENT  598.00  ANNULUS, QVAD2 ACCUMUlATORRLL LNE 1 h AIR OPERATED CONTROL VALVE 12          1WV40      0      SAFElY WJECTIQN I SAFEIY NJECIIQN TO                  CONTAINMENT  598.00  ANNULUS, QVAD2 ACCUMULATORRLL UNE 1 h HR OPERATED CONTROL VALVE 14ICR.251    0      NUCLEARSAMPUNG I STEAM GENERATOR                        AUXIUARY    591.00      VESTIBULE 1 STEAM SAMPLE MSX.10l 0.5 In AIR OPERAlED CONTAINMENTISOLATIOH VALVE 0      NUCLEAR SAMPUNG I STEAM GENERATOR                      AVXIUARY    591.00      VESTIBULE 2 SlEAM SAMLPE MSX.102 0.5 h Adt OPERATED CONTANMENTISOLATION VALVE 0      NUCLEAR SAMPLNG I STEAM GENERATOR                      AVIOUARY    591.00      VESTIBULE 3 STEAM SAMPLE MSX.103 a5 In AIR OPERAlED COHTAWMENTISQtATIQN VALVE 0      NUCLEAR SAMPUNG I STEAM GENERATOR                      AUXIUARY    591.00      VESlIBULE 4STEAM SAMPIE Mslwoc as h AIR OPERATED COMTAIMMEHTISOLATION VALVE 14IRV 151    0    NUCLEARSAMPUNG I STEAM GENERATOR                        CONTAINMENT  812,00  E CONT LWR VENT 1 STEAM SAMPIE MSX.tot 05 In AIR                                              RM OPERATED COMTANMENTISOLhllOM VALVE 14IRV 152    0    NUCLEAR SAMPUNG I STEAM GENERATOR                      CONTANMENT  81 2.00  W CONT LOWER 2 STEAM SAMPLE MSX-1 02 0.5 In A9Z                                            VENT RM OPERATED CONTANMEHTLSQLATKN VALVE 14IRV 153          NUCLEAR SAMPUNG I SIEAM GENERATOR                      CQHTANMENT    812.00    W CONT LOWER 3 SIEAM SAMPLE MSX-1 03 0.5 In AIR                                            VENT RM OPERATED COMTANMENTISQLATlON VALVE i7                      14IRV 1st    0  'UCLEAR SAMPUNG I STEAM GENERATOR                        CONTANMENT    591.00  E CONT LWR VENT 8 BTEAM shMFIE usx.tot as h AIR                                                RM OPERATED COMTANMENTISOLAllON VALVE 7        -
2  ~ * - 14IRVM1      0      MANSTEAM I SIEAM GENERATOR 1 STOP                        AUXIUARY    833.00,E  MAINSTM STOP VALVEMRV 210 SIEAM CYUNDER 'A'UMP                                                  ENCL VALVE
-7            2        14IRV-212    0,    MAINSTEAM I STEAM GENERATOR 1 STOP                      AVXIUARY  833.00    E MAINSTM STOP VALVEMRV.2I0 STEAM CYUHDER 'IT DUMP                                                ENCL VALVE 7          1        '14IRV 221  0      MANSTEAM I STEAM GENERATOR 2 STOP                        AUXIUARY  833.00  W MANSTM STOP VALVEMRV.220 STEAM CYUNDER 'A'UMP                                                  ENCL VALVE 14IRV-222    0      MAN SIEAM I STEAM GENERATOR 2 STOP                      AVXIUARY  833.00  W MAINSIN STOP VALVEMRV.220 STEAM CYUNDER 'P DUMP                                                  ENCL VALVE 14IRV.231    0      MANSTEAM I SIEAM GENERATOR 3 SIQP                        AUXIUARY  833.00  W MAIN STM STOP VALVEMRV.230 STEAM CYUNDER 'A'UMP                                                  ENCL VALVE 14IRV-232          MAINSTEAM I STEAM GENERATOR 3 STOP                      AUXIUARY  833.00  W MAN STM STOP VALVEMRV-230 STEAM CYUNDER 'P DUMP                                                  ENCL VALVE 14IRV-241    0      MAW STEAM ISLAM GENERAl'QR e StOP                        AUXIUARY  833,00    E MAN STM STOP VALVEMRV440 STEAM CYUNDER 'A'UMP                                                    ENCL VALVE 14ARV.242    0      MANSTEAM I STEAM GENERATOR 4 STOP                        AUXIUARY  833.00    E MAINSTM STOP VALVEMRV-240 STEAM CYUNDER 'E DUMP                                                  ENCL VALVE 14IRV 101    0    NUCLEAR SAMPUNG I REACTOR        COQLANI'OOP CONTAINMENT  598.00  ANNULUS. QUADI 1 HOT LEG SAMPLE NSX-1 01 SHUTOFF VALVE 12        HARV 102    0        NUCLEAR SAMPUNG I PRESSURIZER                      CONTAINMENT  812.00  NSTRVMEMTATIQN UQV57 SPACE SAMPLE NSX-1020.5 h AIR                                                RM OPERATED SHUTOFF VALVE 14RV 103    0    NUCLEARSAMPUNG I REACTOR COOLANT                        CONTAINMENT  598.00  ANNVI.VS,QVAD3 LOOP 3 HOTLEG SAMPLE HSV.103 SHUTOFF VALVE 12        14RV 10e              NVCLEAR SAMPUNG I PRESSURIZER                      CONTANMENT  812.00  NSTRUMEMTATION sTEAM SphcE BAMpLEHsx tot as h AIR                                                  RM OPERATED SHUTOFF VALVE 1+RV-1 51                PRESSURIZER I PRESSURIZER                        CQNTANMENT  850.00  PRESSRZR ENCL.
RELIEF VALVE          '0'RESSURE WTERIOR
 
1/5/96 6:53 PM                        DONALD C. COOK NUCLEAR PLANT UNIT 0 1                                                                Page/I 8 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR RELAY REVIEW Erpdp      Train                                System/ Equrpment Oeacrlpbon                          Building    Floor Elev    Room or Raw Col 14/RV.1 52    0          PRESSURIZER  I PRESSURIZER                          COMTHHMEMT        150.00    PRESSRZR ENCI RELIEF VALVE    'B'RESSURE WTERIOR 7          2      14/RV.1 53              PRESSURIZER    I PRESSURtZER                          COMI'AINMENT      850.00    PRESSRZR ENCI RELIEF VALVE    'A'RESSURE INTERIOR 7          12      14RV 10      0            RCTR COOLANT PMP SEAL WTR                            CQHTAINMEMT      117.00      LOWER CONT, WJ/LEAKOFF I RCP 1 SEAL 1 LEAKOFFTO                                                            QUAD1 RCP SEAL WATER REIVRN FILTER QC 100 2 In NR OPERATED SHUTOFF VALVE 14RV 111              GVCS I REACTOR COOLANT NORMAL                            CQNTAIHMENl      112.00      LOWER CONT, LETDOWN TRAIN'A'HUTOFF VALVE                                                                QUAD4 14RV 112    0        GVCS I REACTOR COOLANT NORMAL                            CONfAWMEMT      112.00        LOWER CONT, LETDOWN TRAW R'HVfOFF VALVE                                                                QUAD4 14RV 113              GVCS I REACTOR COOLANT EXCESS                            CONTAWMENT      112.00        LOWER CONT, LEmQWN TO EXCESS LEIDOWMHEAT                                                                QVAD4 EXCHANGER HE-131 In NR OPERATED 'ip SHUTOFF VALVE 14RV.114              CVCS I REACTOR COOLANT EXCESS                            CONTAWMENT      112.00      LOWER CONT, LETDOWN TO EXCESS LETDOWN HEAT                                                                QUAD4 EXCHANGER HE 13 1 In HR OPERATED VALVE                    'A'HUTOFF 12      14RV 150                'CTR CQOLAMI'MPSEAL WTR                                COMfhlNMENT      508.00      ANNULUS, QUAQ2 WJ/LEAKOFF I REACTOR COOLANT PUMPS STARTUP SEAL SYSIEM BYPASS TO SEAL WATER RETURN FILTER QC-100 0.75 In AIR
                                                                ~
OPERATED SHUTOFF VALVE 12      14RV.170                  CVCS I EXCESS lElDOVWHEAT                              COMI'AWMENT      112.00    REGEM HEATXCHGR EXCHANGER HE.13 1 In AIR OPERATED                                                              RM OUTLET PRESSURE CONTROL VALVE 12      14RV 171                  CVCS I EXCESS              HEAT                        CONTAWMEHT-      112.00    REGEN HEAT XCHGR EXCHANGER HE.1 3 1 In AIR OPERATED                                                              RM OUTLET DIVERSION VALVE 12        14RV-20      0            RCTR COOLANT PMP SEAL WTR                            COMTAWMEMT        117.00      LOWER CONT, WJ/LEAKOFF I RCP 2 SEAL 1 LEAKOFF TO                                                            QUAD2 RCP SEAL WATER RETURN FILlER QC 100 2 In AIR OPERATED SHUTOFF VALVE 12      14RV451            CVCS I SEAL WJECTIQN WATER FLOW 3 In                          AVXUARY        587.00      RECIPRQCATWG AIR OPERAlED CONTROL VALVE                                                            CHRG PMP RM 12        14RV~      0            RCTR COCMM PMP SEAL WTR                              CONTAWMEMl'12.00              LOWER CONT, WJ/LEAKOFF I RCP 3 SEAL 1 LEAKOFF TD                                                            QUAD3 RCP SEAL WATER RETURN FILTER QC 100 2 In AIR OPERAlED SNITOFF VALVE 12        14RV~                    RCTR GCKXAMPMP SEAL WTR                              COMTAWMENT        612.00      LOWER CONT, WJ/LEAKOFF I RCP 4 SEAL 1 (EAKOFF TO                                                            QUAD4 RCP RETURN FILTER QC-100 2 In /rJR OPERATED SHUTOFF VALVE 12      14RV~        0    GVCSI NORTH BORIC ACID BLENDER QP 21                            AUXIUARY,      600.00    VOL CONTROl. TANK 2 In AIR OPERATED TO CVCS CHARGWG                                                          E HALLWAY PUMP SUCTION SHUTOFF VALVE 12      14RV<11      0      CVCS (BORON MAKEUP)I NORlH BORIC                              AVXIUARY      587.00      BORIC ACID STOR ACID FILTER TO CVCS CHARGWG PUMPS                                                              TANK AND NORTH BORIC ACID BLENDER 1 In AIR OPERATED FLOW CONTROL VALVE 14RVM1        0      BORON MAKEUP (CVCS) I NORTH BORIC                            AVXIUARY      609.00    VOL CONTROL TANK ACD BLENDER QP-21 TO REACTOR                                                            E HALLWAY COOLANT LETDOWN VOI.UME CONTROL TANK SNll'QFF VALVE T.VRVQ15      0        CONlRQL ROOM A/C CNLLWATER I                                AVX/UARY      150.00    CONTROL ROOM A/C CONTROL ROOM VENT UNIT HYDRA.1                                            I ROOM CHILLWATER INLET/BYPASS, 3 WAY HROPERATED CONTROL VALVE 7        1      1  VRV425    0        CONTROL ROOM h/C CHILLWATER I                              AVXIUARY      650.00    CONTROt. ROOM h/C CONTROL ROOM VENT UNIT HVWCRA-2                                                                ROOM CHtLLWATER INLET/BYPASS 3.WAYAIR OPERATED COHTRQL VALVE 1-WRV.761      0    ESW I EAST ESW PUMP PP.7E TXSCHARGE                          SCREENHOUSE      501.00    E ESSHTL SERV WTR STRAWER EAST BASKET BACKWASH                                                                PMP RM OUTLET SHUTOFF VALVE 1-WRY-712      0            ESW I WEST ESW PUMP PP.7W                            SCREEHHQUSE      591.00      W ESSHTL SERV (XSCHARGE STRAWER EAST BASKET                                                            WTR PMP RM BACKWASHOUTLET SHUTOFF VAVLE 1.WRV.761          ESW I EAST ESW PUMP PP.TE IXSCHARGE                          SCREENHOUSE      591.00    E ESSNTL SERV WTR STRAINER EAST BASKET BACKWASH 4 In                                                            PMP RM AIR OPERATED INLETSHUTOFF VALVE 1.WRV-787                  ESW I WESf ESW PUMP PP.7W                            SCREENHOUSE      591.00      W ESSNlL SERV TXSCHARGE STRAINER EAST BASKET                                                            WTR PMP RM BACKWASHWLET 4 In AIR OPERATED SHUTOFF VALVE 1  WRV.771    0    ESWI EAST ESW PUMP PP.7E DISCHARGE                            SCREEHHOVSE      501.00    E ESSNTL SERV WTR STRAWER WEST BASKET BACKWASH                                                                PMP RM OUTLET SHUTOFF VALVE 7                1.WRV.772      0          ESW I WEST ESW PUMP PP 7W                              SCREENHQUSE      501.00      W ESSMTL SERV DISCHARGE SIRAWER WEST BASKET                                                              WTR PMP RM BACKWASHSHUTOFF VALVE 1-WRV.778          ESW I EAST ESW PUMP PP-7E DISCHARGE                          SCREENHOVSE      591.00    E ESSNTL SERV WTR STRAWER WESf BASKET BACKWASH                                                                PMP RM WLET 4 In AIR OPERAlED SHUTOFF VALVE 1.WRV.777                  ESWI WEST ESW PUMP PP.TW                              SCREENHOUSE      501.00      W ESSNIL SERV DISCHARGE STRAWER WEST BASKET                                                            WTR PMP RM BACKWASH INLET4 In AIR OPERATED SHUTOFF VALVE
 
fi5/96 6:53 PM                        DONALD C. COOK NUCLEAR PLANT UNIT 1        &#xb9;                          Page &#xb9;9 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR RELAY REVIEW Equip      Train  Equipment ID  Rav                                                              Room or Row Col No 14CRV-220          DESEL STARTNQ HR I AB EMERG DESEL      AUXNJARY    587.00 AS EMER OSL GEN STARTNQ AIR JEI'SSIST CONTROL VALVE                                RM 14%V.222      0  DESSEL STARTNG AIR I AB EMERG DESEL    AUXNJARY    587.00 AB EMER DSL GEN REAR SANK STARTNG HR SHUTOFF VALVE                                RM 7          2    14%V-225            DESEL STARTNG HR I CO EMERG DESEL      ANQUARY    587.00 CO EMER OSL GEN STARTNQ AIR JET ASQST CONTROL VALVE                                RM 7          2    1.XRV-220      0    DESEL STARTNQ AIR I CD EMERG DIESEL    AUXIUARY    587.00 FRONT BANKSTARTINQ AIR SHUTOFF VALVE 1-XRV-227      0  DESEL STARTNG HR I CD EMERQ DIESEL      AUXIUARY  587.00  CO EMER OSL GEN REAR BANKSl'ARTNG AIR SHUTOFF VALVE                                RM 12    1242LV41      0    CONDENSATE STORAGE SUPPLY I UNIT 1      lURBNE    501.00  AUXFEED PMP E AND 2 CONDENSATE STORAGE TANK                              HALLWAY CROSSllE 8 In AIR OPERATED SHtlTOFF VALVE 12    12~VAI0        0        CVCS I NORTH BAST TK.12N 2 In AIR  AVXNJARY  557.00  BORIC ACN7 STOR OPERATED NLET FLOW CONTROL VALVE                                TANK 12    12CRV<20      0    CVCS (BORON MAKEUP) I MNXXES BAST    ANQUARY    587.00  BORIC ACID SR&#xc3;t lK.12M 2 In AIR OPERATED NLET FLOW                              TANK 1~1          0 CONTROL VALVE CCW I REACTOR COOLANT PUMPS BEARNQ DL COOLERS OCW RETURN AUXIUARY    501.00      STAR TUP BLOWDOWN HEADER 'A'ONTANMENT8 h MOTOR                            FLASHTANKRM OPERATED ISOLATIONVALVE 0    COW I RC PUMPS BEARNG DL COOLERS      AUXNJARY    50 I.OO      STARTUP CCW RETURN HEADER %'ONTAINMENT8                              SLOWDOWN h MOTOR OPERATED ISOLAllONVALVE                          FLASHTANKR M 0      CCW I RCP THERMALBARRIER CCW        AUXNJARY    501.00      STAR TUP OUTLET'A'X7NTANMENT4 In MOTOR                              SLOWDOWN OPERATED ISOLATlON VALVE                            FLASHTANKR M 0  CCWIRCPUMPSTHERMALBARRIERCCW            AUXNJARY    591.00      STARTUP RETURN HEADER 'B'ONTAINMENT4 In                            BLOWDOWN MOTOR OPERATED ISOLATION VALVE                          FLASHTANKRM CCW I CCW TO REACTOR COOLANT PUMPS      AUXNJARY    591.00      STARTVP TRAN'A'ONTAINMENTISOLATION VALVE                              BLOWDOWN FLASHTANKRM 0  CCW I CCW TO REACTOR COOLANT PUMPS      AUXIUARY    591.00      STARTUP TRAN%'ONTANMENTISOLAllONVALVE                                  SLOWDOWN FLASHTANKRM 1~10          0    COW I EAST CCW TO HEAT EXCHANGER HE-1 SE CCW OUTLET SHUTOFF VALVE AUXNJARY    009.00    009 HALLWAY 14JNO411            COW I CCW PUMPS SUCBON CROSSTIE      AUXNJARY  009.00    009 HALLWAY HEADER 'A'8 In MOTOR OPERATED SHWOFF VALVE 1~12          0    CCW/CCW PUMPS DISCHARGE CROSSlIE        AVXNJARY  000.00    009 HALLWAY HEADER 'A'0 In MOTOR OPERATED SHUTOFF VALVE 14J4O413            CCW I CCW PUMPS SUCTION CROSSTIE      AUXNIARY  009.00    00Q HALLWAY HEADER %'8 In MOTOR OPERATED SHUTOFF VALVE 1~14              CCW I CCW PUMPS DISCHARGE CROSSllE
                                                    'A'18 AUXNJARY  009.00    009 HALLWAY HEADER        in MOTOR OPERATED SHUTOFF VALVE 14J4O415            CCW I CCW TO MISCELANEOUS SERVICE    AUXNJARY    009.00    009 HALLWAY HEADER 'A'18 in MOTOR OPERATED SHUTOFF VALVE 1~10          0    COW I CCWTO MISCELANEOUS SERVICE      AVXNJARY    009.00    009 HALLWAY HEADERS 10 h MOTOR OPERATED SHIITOFF VALVE 14JJI3419      0    CCWI EAST RHR HEAT EXCHANGER HE      AUXNJARY    009.00    009 HALLWAY 17E CCW OUTLET SHUTOFF VALVE 14JNO420            CCW I WEST CCW TO HEAT EXCHANGER      AUXNJARY    009.00    009 HALLWAY HE-1 5W CCW OUTLET SIIUTOFF VALVE 1~20          0    CCWI WEST RHR HEAT EXCHANGER HE.
17W CCW OWLET SHUTOFF VALVE AUXNJARY    033.00    033 HALLWAY 1+MO-211              AUXFEEDWATER I lURBNE DRIV AUX      AUXNJARY  0 I 2.00 FEED PUMP PPP DISCHARGE TO SIEAM GENERATOR OME4.1 4 In MOTOR OPERATED CONTR OI. VALVE 14'MO 212    0    AUXFEEDWATERI WEST MOTOR DRIV AUX      AVIQUARY  012.00 FEEDWATER PUMP PP4W SUPPLY TO SIEAM GENERATOR OME4.1 4 h MOTOR OPERATED CONTROL VALVE 1+MD 221      0    AUXFEDWATER I TURBINE DRIV AUXFEED      AVIARY    501.00        STARTUP PUMP PPR DSCHARGE TO STEAM                                BLOWDOWN GENERATOR OME4.2 4 h MOTOR                            FLASHTANKRM OPERATEO CONTROL VALVE 0    AVXFEEDWATER I EAST MOTOR ORIV AUX      AUXNJARY  591.00        STAR TUP FEED PUMP PP46 SUPPLY TO STEAM                              BLOWDOWN GENERATOR OME 3-2 4 h MOTOR                            FLASHTANKRM OPERATED CONIROL VALVE 1+MD 231            AUXFEEDWATEER I TVRBUNE DRIV AUX      AUXNJARY  501.00        STAR TUP FEED PPQ PUMP SUPPLY TO STEAM                              BLOWDOWN GENERATOR OME 33 4 In MOTOR                            FLASHTANKRM OPERATED CONTROL VALVE 0    AUXFEEDWATER I EAST MOTOR DRIV AUX      AUXNJARY  501 JO        STARTUP FEED PUMP PP4E SUPPLY TO STEAM                            SLOWDOWN GENERATOR 33 4 In MOTOR OPERATEO                            FLASHTANKRM CONTROL VALVE
 
1/5/96 6:53 PM                        DONALD C. COOK NUCLEAR PLANT UNIT 1                                &#xb9;                          Page&#xb9; 10 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW Equip      Train    Eqrapment ID              System/ Equipment Desorip0on                            Bu44in0 Boor Bev    Room or Row Cd 8          1      1+MD-241      0      AVXFEEDWATER/TURBOIEDRIVAUX                                AUXIUARY  01200    E MHN SIM STOP FEED PUIAP PP4 IXSCHARGE TO STEAM                                                        ENCL GENERATOR OME44 4 In MOTOR OPERATED CQMIRQL VALVE I+MQ 242      0  AUXFEEDWATER I WEST MOTOR DRIV AUX                              AUXIUARY  012.00    E MHN STM STOP FEED PUMP PP4W SUPPLY TO STEAM                                                        ENCL GENERATOR 34 4 h MOTOR OPERATED CONTROL VALVE 14IVJX3P-ABI    0          DIESEL ROOM VENBLATIONI AB                              AVXIUARY  5S7.00  AB EMER DSL GEN EMERGENCY DIESEL GENERATOR ROOM                                                          RM VEMBIATIONEXHAUST FAN HVJJGX 1 TEMPERING AIR DAMPER 0      D!ESEL ROOM VEMBLABONI IXESEL                              AUXNJARY  587.00  AB EMER DSL GEN GENERATOR ROOM 1AB VENILATION                                                          RM SUPPLY FAN    HV~1    TEMPERNG AIR DAMPER 1 JIV~.ABZ 14IV4XIP4XII    0        IXESEL ROOM VEMBIABQNI CO                                AUXLIARY EMERGENCY IXESEL GENERATOR ROOM VENBIATIONEXHAUST FAN HVJXIJC.2 lEMPERIMG AIR DAMPER 0    IXESEL ROOM VENBLABQNI DIESEL GEM                              AUXIUARY  587JN    CD EMER DSL GEN ROOM 1 CD VENBIATIONSUPPLY FAN 1                                                          RM HV43GS.2 TEMPERING AIR DAMPER 1 JPI-DDP4XI2 0          IXESEL ROOM VENBLATIQNI AB                              AUXIUARY    59LOO      RCTR CABLE EMERGENCY DIESEL GENERATOR ROOM                                                    TVMNEIQUAD3 VEMBIATIONSUPPLY FAN HV4IGS.1 OUTSIDE HR SHUTOFF DAMPER 14IV4IGSDCO      0          DIESEL ROOM VENBIABQNI CD                                AUXIUARY    SSLOO  STORAGE TANKPIPE EMERGENCY DIESEL GENERATOR ROOM                                                        TUNNEL VENBIATIONSUPPLY FAN HV DGS-2 OUTSIDE AIR SHUTOFF DAMPER 12                            AUIOUARYBNUXNG VEMBLATIONI 4KV                              AVXLIARY    SNLOO  4KV RM 000V SWGR ROOM 800V SWII'CHGEAR TRANSFORMERS 1811A 8 IR11C AREA VEMI'UPPLYFAN HV4GRS4 SUCBQH DAMPER 12                            AUXIUARYBULDINGVENTILATIONI 4KV                              AUXIUARY  SIN.OO  4KV RM 000V SWGR ROOM SOOV SWIICHGEAR TRANSFQIIMERS AREA VENIIATIOHSUPPLY FAN HV4GRS-7 SUCBQH DAMPER 12                    0  AUXIUARYBUILDINGVEMBIATIQNI SOOVAC                              AUXIUARY  0ILOO  4KV RM MEZZAMOIE MOTOR CONTROL CEMIER MEZZANINE AREA VENBLATlOHSUPPLY FAN HV4GRS-0 VENT DAMPER 12      14CM-111          RHR I RHR TO REACTOR COQthN'OOPS 2                            CONHNMENT    59LOO    ANNULUS, QVAD2 AND 3 COLD LEGS CONTAINMENT ISOLATIONVALVE 14CM.129    0    RHR I REACTOR COQthMT LOOP 2 HQT LEG                        CQNTHNMENT    50LOO    ANNULUS, QVAO2 TD RHR PUMPS SUCBON CONTAINMENT ISQLABQMVALVE BORON NJECBQN I BORON NJECBON                                AVXIUARY  01200    BORON INJ TANK TANK'A'OMTHNMENT ISOLATIONVALVE                                                      OUTLET VLVRM r  8                  14CM451      0      BORON OUECBQH I BORON NJ ECTION                              ALOOUARY  01200    BORON INJ TANK TANK Iy CQMTAINMENTLqQLhllON VALVE                                                    OUTLET VLVRM SAFEIY NJECBONI MQRIH SAFETY                                AUXIUARY  587.00  NSAFEIYINJPMP NJECBOM PUMP PP-28M DISCHARGE                                                          RM COMTHNMENTISQLABON 4 h MOTOR OPERATED VALVE 0        SAFETY INJECBQN I SOUTH SAFETY                            AUXIUARY    557.00  S SAFEIY NJ PMP OUECBQN PUMP PP.20S DISCHARGE                                                          RM CQHTHNMENTISOIATION4 In MOTOR OPERATED VALVE 0      RHR I RECOICVtABQN SUMP TO                                  AVXIUARY  50186        VESTIBULE PUMPS SUCTION CONTAINMENT EASI'HRICTS ISOthllQN 1 5 In MOTOR OPERATED VALVE 0      RHR I RECOICUIABQN SUMP TO WEST                              AVXIUARY  501Am        VESBBULE RHR/CTS PUMPS SUCTION      CONTAINMENI'SQCATIQM 18 In MOTOR OPERATED VALVE 14Cas311      0    RHR I EASI RHR TO REACTOR COOLANT                            AUXIUARY  009.00    EAST RHR HEAT LOOPS 1 ANO 4 HOT LEGS CONTHNMENT                                                    EXCHGR RM ISQLAllQNS In MOTOR OPERATED VALVE 14CM421      0    RHR I WESI RHR TO REACTOR COOthNT                            AVXIUARY  009.00  WRHRHEATXCHGR LOOPS 2 ANO 3 HOT LEGS CONTAINMENT                                                        RM ISOIATIQH8 In MOTOR OPERATED VALVE 14MO 12S          RHR I REACTOR COQIAMT LOOP 2 HOT LEG                          CONTHNMENT  595.00      LDWER CONT, TODISCHARGE RHR PUMPS SUCBON SHUTOFF VALVE                                                        OUAD2 14MO 210                  CQNTAINMEMTSPRAY I EAST                                AVXIUARY  573.00  E CONT SPRAY PMP CONTAINMENTSPRAY PUMP PP4E                                                            RM IXSCHARGE SHUTOFF 10 In MOTOR OPERATED VALVE 5                  14MQ.211                  CONTAINMENTSPRAY I EAST                                AVXIUARY  573.00  E CONT SPRAY PMP CONTHNMENTSPRAY PUMP PP4E                                                              RM CNSCHARGE SHUTOFF 10 In MOTOR OPERATED VALVE 14MQ.212                  CQNTHNMEMTSPRAY I EAST                                  AUXIUARY  573.00  E CONT SPRAY PMP CONTHNMENT SPRAY PUMP PP4E                                                            RM TO CONTAINMENT SPRAY ADDIBVEEDUCTOR 2 In MOTOR OPERATED SHUIQFF VALVE
 
1/6/96 6:53 PM                    DONALD C. COOK NUCLEAR PLANT UNIT /I 1                                        Page //11 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW Equip      Tain Equipment IO                Sfeurm I EqwpmenI Oeecnpbon              Buiioing Boor Bee    Room or Raw Col 8          2    14ACLHS      0      CONTAOIMEMTSPRAY I RWST TO EAST              ALOOLIARY  573.00  E CONT SPRAY PMP CONTAOIMENTSPRAY PUMP PP4E                                            RM SUCDOM 12 In MOTOR OPERATED SHUTOFF VALVE CONT/aIENT SPRAY I WEST                AVXIUARY  STk00  WCOMTSPRAYPMP CONT/VNMEMTSPRAY PUMP PP4W                                            RM QSCHARGE SHUTOFF 10 In MOTOR OPERATED VALVE 14MO 221    0            CQMDANMEMfSPRAY I WEST                  AUXIUARY  57300  WCONTSPRAYPMP CONTAINMEMTSPRAY PUMP PP4W                                            RM QSCHARGE SHUTOFF 10 In MOTOR OPERATED VALVE CONTAOIMENTSPRAY I WEST                AVXIUARY          W CONT SPRAY PMP CONTAINMENTSPRAY PUMP PP4W                                              RM QSCHARGE TD COMDANMENTSPRAY ADOBlVE EDUCTOR SHUTOFF 2 In MOTOR OPERATED VALVE 0      CONTAINMENTSPRAY I RWSI'O WEST                AUXSJARY  573.00  W CONT SPRAY PMP COMTAOIMEMTSPRAY PUMP PP4W                                              RM SUCDON 12 in MOTOR OPERATED SHUTOFF VALVE 14AQ 255            BORON WJECDON I BORON NJECBQN                AUXIUARY  012.00  BORON INJTANKRM she TANK OILEfSHUTOFF VALVE 1  80450            BORON INJECDQN I BORON NJECBON                AUXIUARY  012.00  BORON INJ TANKRM If TANK OILET SHUTOFF VALVE 12  14MO.251              REFUEUNG WATER SIQRAGE TANK                AVXIUARY  557.00    N SAFETY NJ PMP SUPPLY I TKOS SUPPLY TO SAFETY                                        RM IMJECDOM PUMP SHUTOfV 8 in MOTOR OPERATED VALVE 0        REFVEUNG WATER STORAGE TANK                AVXRJARY  587.00  S SAFEIY INJ PMP SUPPLY I SAFElY NJECDQH PUMPS                                          RM REQRC TO REFUEUNG WATER STORAGE TANKTYA3TRAIH 'A'HUTOFF 2 ln MOTOR OPERATED VALVE 0        REFUEUNG WAlER STORAGE TANK                AVXIUARY  587.00  S SAFETY INJ PMP SUPPLY I SAFElY NJECDOM PUMPS                                            RM REQRC TO REFUEUNG WATER STORAGE
                                                        'If TANKTKG3 TRAOI SHUTOFF 2 In MOTOR OPERATED VALVE 14AO-270            SAFETY INJ ECDON I SAFETY INJECBOH            AVXIUARY  557.00  N SAFElY INJ PMP PUMPS QSCHARGE CROSSBE TRAIN                                              RM 4 ln MOTOR OPERATED VALVE
                                                                          'A'HUTOFF 14AO.275            SAFEIY INJECDON I SAFETY NJECBQN              AUXILIARY  587.00  S SAFETY INJ PMP PUMPS DISCHARGE CROSSDE TRAIN IT                                          RM SHUTOFF 4 In MOTOR OPERATED VALVE 14AO010      0      RHR I EASf RHR PUMP PP45E SUCDQH              AVXIJARY  SPLOO  EAST RHR PUMP RM SHUTOFF 14 In MOTOR OPERATED VALVE 8          2    14AQ31 2    0  RHR I EAST RHR HEAT EXCHANGER HE-17E            AUXIUARY    009.00    EAST RHR HEAT OUTLET MIISFLQW LINE SHUTOFF VALVE                                      EXCHGR RM 8          2    14AO414          RHR I EASf RHR PUMP PP45E QSCHARGE              AVXIUARY    009.00    EAST RHR HEAT CROSSBE SHUTOFF 8 in MOTOR OPERATEO                                      EXCHGR RM VALVE 8          2    14M031 5              RHR I EAST RHR AND NORTH SAFETY            CONftuIMENT  012.00  E CONT LWR VENT NJECDON TO REACTOR COOLANT LOOPS 1                                          RM AND 4 HOT LEGS SHUTOFF VALVE 1440310              RHR I EAST RHR AND NORTH SAFElY            CONTAINMENT  d12.00  E CONT LWR VENT NJECDQN TO REACTOR COOLANT LOOPS 1                                          RM ANO 4 COLD LEGS SHUTOFF 8 In MOTOR OPERATED VALVE RHR I WEST RHR PUMP PP45W SUCBQN              AUXSJARY    573.00    W RHR PUMP RM SHUTOFF 14 in MOTOR OPERATED VALVE 0      RHRIWESTRHRHEATEXCHANGERHE                    AVXNJARY    009.00  W RHR HEATXCHGR 17W OUILET LOISFLQW UNE SHUTOFF                                          RM VALVE 1440424                  RHR I WEST RHR PUMP PP45W                AUXnJARY    009.00  W RHR HEAT XCHGR QSCHARGE CROSSBE SHUTOFF 8 In                                          RM MOTOR OPERATED VALVE RHR I WEST RHR ANO SOUTH SAFETY            CONfhNMENT  01200      W CONT LOWER 84JECDOH TO REACTOR COOLANT LOOPS 2                                        VENT RM ANO 3 HOT LEGS SHUTOFF VALVE 0        RHR I WESf RHR ANO SQVIH SAFElY            CQNTAINMENI'12.00      W CONT LOWER NJECTlQN TO REACTOR COOLANT LOOPS 2                                        VENT RM AND 3 COLD LEGS SHUTOFF 0 In MOTOR OPERATED VALVE 0    RHR I EAST RHR TO UPPER CONTAINMENT            AUXIUARY  009.00    EAST RHR HEAT SPRAY SHUTOFF din MOTOR OPERATED                                      EXCHGR RM VALVE 14AO331      0    RHR I WESI'RHR TO UPPER CONTANMENT              AVXIUARY  509.00  W RHR HEAT XCHGR SPRAY SHUTOFF 8 In MOTOR OPERATED                                          RM VALVE 12                        RHR I EAST RHR HEAT EXCHANGER TO              AVXLIARY  009.00    EAST RHR HEAT CHARGING PUMPS SUCBON SHUTOFF S in                                      EXCHGR RM MOTOR OPERATED VALVE 12                0        RHR I WEST RHR HEAT EXCHANGER                AUXILIARY  009.00  WRHRHEATXCHGR OUILETTO SAFElY NJECDON PUMP                                            RM SUCDON SHUTCFF 8 In MOTOR OPERATEO VALVE 12                0      SAFEIY NJECDQN I SAFETY INJECBQN              AUXklhRY  557.00    W CENTRIFUGAL PUMPS TO CVCS CHARGOIG PVMPS                                      CHRG PMP RM SUCBOH HEADER CROSSBE SHUTOFF VALVE
 
1/S/96 6:53 PM                          DONALDC. COOK NUCLEAR PLANT UNIT 1              &#xb9;                      Page&#xb9; 12 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR RELAY REVIEW Equip      Train    Equipmanl IO                Sfaram I Equipmanl Descripbon 0            2        14MO481            SAFEIY NJ ECAON I SAFETY NJ ECAON        AUXIUARY  587.00  N SAFElY NJ PMP PUMPS SUCllON TO AND FROM CHARGNG                                    RM PUMPS SVCAON 'A'HUTOFF 4 In MOTOR OPERATED VALVE 0      SAFElY NJECAON I SAFElY INJECTIQH        AVXIUARY    587.00  HSAFETYNJPMP PUMPS SVCAQM TO ANO FROM CHARGNG                                    RM PUMP 'IfSHUTOFF 4 In MOTOR OPERATED VALVE 12                      0  RHRIRWSTTK43TORHR PUMPSSUCllON              AVXIUARY    591.00    VESABVLE SHUTOFF 12 In MOTOR OPERATED VALVE 14M051    0                        I BORON INJECAON BORON NJECAQH TO          CONTANMENT    59LLOO  ANNULUS, QVAD1 REACTOR COOLANT LOOP 1 SHUTOFF 1.5 In MOTOR OPERATED VALVE BORON NJECAQH I BORON INJECAQN TO        COMTANMENT    59LLOO  ANNULUS, QUAD2 REAClOR COOLANfLOOP 2 SHUTOFF 1S In MOTOR OPERATED VALVE 1 AO45    0    BORONNJECllQN I BORON NJECAOH TO        COMTANMENT    598.00  ANNULUS, QVAD3 L                REACTOR COOLANT LOOP 3 SHUTOFF 1.5 In MOTOR OPERATED VALVE 0    BORQH NJECAQN I BORON NJECAQN TO        CONTAINMENT  SRLOO  ANNULUS,  QVAD4 RECIPROCATING REACIDR COOLANT LOOP 4 SHUTOFF 1.5 in MOTOR OPERATED VALVE 2        14MQJII 0    0                I CVCS RWST TO CHARGIHG PV MP          AUXIUARY    587.00 SUCAON SHUTOFF VALVE                                  CHARGNQ PUMP ROOM 1        14MO911                CVCS I RWSTTO CHARGNG PUMP            AVXIUARY    587.00 E CNTRFGL CHARG SUCTION SHUTOFF VALVE                                    PMP RM 1      14SO.240      0        DIESEL LUBE OIL I AB EMERG DIESEL      AUXLIARY    587.00 AB EMER OSL GEN UPPER VALVEGEAR LVBRCATLOM                                      RM COMIROL SOLENOID 1 1      1480-241      0        IXESELLVBELXLIABEMERG DIESEL            AVlOLJARY  587.00  AB EMER OSL GEN I
UPPER VALVEGEAR LVBRCAllON                                      RM CONTROL SOLENOID 2 0        DIESEL LUBE OIL/CO EMERG DlESEL        AVXIUARY  587.00  CD EMER DSL GEN GEHERATOR UPPER VALVEGEAR                                      RM LIB%CATIONCONTROL SOLENOlD 1 2        1480.240      0        DIESELLVBEOIL/CO EMERG DIESEL          AUXIUARY  587.00  CD EMER DSL GEN GENERATOR UPPER VALVEGEAR                                      RM LUBRCAllONCONTROL SQLENQLO 2 MANSTEAM I MAINSTEAM LEAD 2 TO AUX          AVXIUARY  03%00  W MANSTM STOP FEED PUMP TVRBNE 4 In MOTOR                                    ENCL OPERATED SHUTOFF VALVE 14LCM-231    0    MANSTEAM I MAN STEAM LEAD 3 TO AUX          ALOOUARY  033.00  WMAINSTMSTOP FEED PUMP IVRBNE 4 in MOTOR                                    ENCL OPERATED SHUfDFF VALVE 14LMO 210    0    MAINSTEAM I STEAM STOP VALVEMRV.210          AVXIUARY  033.00  E MANSTM STOP STEAM CYLNOER DUMP 4 In MOTOR                                    ENCL OPERATED VALVESSELECTOR VALVE 14LMOG20      0    MANSTEAM I STEAM STOP VALVEMRV-220          AVXIUARY    033.00  W MAINSTM STOP SlEAM CYLNDER DUMP 4 In MOTOR                                    ENCL OPERATED VALVESSELECIQR VALVE 1      14IMO.230    0    MAN STEAMISTEAM STOP VALVEMRV-230          AUXIUARY    033.00  W MAN STM STOP STEAM CYLNDER DUMP VALVES 4 In                                    ENCL MOTOR OPERATED SELECTOR VALVE 14IMO 240    0    MANSTEAM I STEAM STOP VALVEMRV.240          AUXIUARY    033.00  E MAN STM STOP STEAM CTUNDER DUMP VALVE4 In MOTOR                                    ENCL OPERATED SELECTOR VALVE 1&MD 151      0      PRESSURZER I PRESSURIZER REUEF VALVENRV-151 UPSTREAM 3 In MOTOR OPERATED SHUTOFF VALVE 14IMO.1 52    0      PRESSUIBZER I PRESSURIZER REUEF        CONTAINMENT  050.00  PILESSRZR ENCL, VALVENRV.152 UPSTREAM 3 In MOTOR                                  INTER!OR OPERATED SHUTOFF VALVE 14IMQ 153    0      PRESSURIZER I PRESSURIZER REUEF VALVEHRV 153 3 9L MOTOR OPERATED L&SIREAMSHUTOFF VALVE 14LSO01              REACIQR COOLANT SYSlEM VENTS I        CQMTANMENT  050.00  PRESSRZR ENCL, PRESSURIZER OMEN POST ACCCENT                                    NTERIQR VEMl'A'OLENOIDVALVE REACTOR COOLANT SYSTEM VENTS I        COMTANMEMf  050.00  PRESSRZR ENCL PRESSVRLZEIL OMEQ POST4CCCENT                                    NTERIOR VENf'A'OLENOIDVALVE 0        REACTOR COOLANT SYSTEM VENTS        I PRESSVRIZER OMER POSTWCCCEMT VENT 'P SOLENOID VALVE REACICR COOLANT SYSTEM VENTS I        CONTAINMENT  050.00  PRESSRZR ENCL PRESSURIZER OMEN POST-ACCCENT                                    NTERIOR VEMf.'E SOLENOtO VALVE RCIR COOLANT PMP SEAL WTR          CQHTAINMEMT  598.00  ANNULUS, OVAO2 I
NJILEAILOFF RCP SEAT WATER REIVRN
                                          'A'ONTAINMENTISOLATION4 In MOTOR OPERATED VALVE RCTR COOLANT PMP SEAL. WIR          AVXIUARY  591.00 NJILEAKOFF I RCP SEAL WATER REIVRN
                                          'IfCONTANMEMfISOLATION 4 In MOTOR OPERATED VALVE 1~200              CVCS I CHARGNQ TQ REGENERATIVE HEAT        AUXIUARY    587.00  RECLPRQCATNQ H LCHANQER 'A'HUtOFF VALVE                                CHRQ PMP RM 143MQ-201    0    CVCS I CHARGNQ TO REGENERATE HEAT          AUXILIARY  587.00  RECIPROCATING EXCHANGER    If SHUTOFF VALVE                            CHRQ PMP RM
 
1/5/96 6:53 PM                        DONALD C. COOK NUCLEAR PLANT UNIT 0 1                                              Paget  13 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW Equip      Trsin                              System/ Equipment Desoripuon                Buddeg  Floor Bev    Room or Row Col 8          2                    0      CVCS I EAST CEMTRIFUGAI.CHARGNG                AUXIUARY    587.00    W CENTRIFUGAL PUMP MII8 FLOW TO RCP SEAL WATER                                        CHRQ PMP RM HEAT EXCHANGER HE-11 2 In MOTOR OPERATED SHUTOFF VALVE 0    CVCS I WEST CENTRIFUGALCHARGNG                  AUXIUARY    587.00    W CENTRIFUGAL PUMP M94I FLOW TO RCP SEAL WATER                                        CHRQ PMP RM HEAT EXCHANGER HE-11 2 In MOTOR OPERATED SHUTOFF VALVE 12      143MO410    0    CVCS I EMERQ. BQRAllON TO CHARGNG                AUXIUARY    587.00    BORIC AC57 ST OR PUMP SUCIlOM SHUTOFF VALVE                                              TANK 1~O451      0      CVCS / REACTOR COQEAMT LETDOWN                AUXkJARY    609.00  VOL CONTROL TANK VOLUMECONTROL TANKTK-1 0 TD                                            E HALLWAY CHARGNG PUMP 'A'HUTOFF 4 In MOTOR OPERATED VALVE 0      CVCS I REACTOR COQVWT LEIDQWN                  AUXIUARY    609.00  VOL CONTROL TANK VOLUMECONTROL TANKTK 10 TO                                            E HALLWAY CHARGNG PUMP%'HUTOFF 4 In MOTOR OPERATED VALVE 12        143T400          MANSTEAM I lURBNE DRIV AVXFEED                    TURBNE    591.00    TB DRIVEN AUX PUMP PPA TRIP AND THROTTLE VALVE                                          FDWTR PMP 1-WMO-701        ESW I EAST ESW PUMP PP 7E IXSCHARGE            SCREENHOUSE    591.00  E ESSMTL SERV WTR SHVfOFF VALVE                                                    PMP RM 1.WMO 702    0          ESW/WEST ESW PUMP PP.TW                  SCREEMHQI/SE  591.00    W ESSMTL SERV DSCHARGE SHUTOFF VALVE                                            WTR PMP RM 1.WMO 705    0        ESW/WEST ESW SUPPLY HEADER                                        ESSMTL SERV WIR CROSSllE TO UNIT 2 20 In MOTOR                                        PIPE TUNNEL OPERATED SHUTOFF VALVE 1.WMO 707    0    ESW I EAST ESSEMIIAL SERVICE WATER                TVRBNE    569.00  ESSNTL SERV WfR SUPPLY HEADER CROSSTIE TO UI07 2 20 In                                      PIPE TUNNEL MOTOR OPERATED SHVIQFF VALVE 14IVMO.771    0    ESW I EAST COMTANMENTSPRAY HEAT                  AUXIUARY    633.00      633 HALLWAY EXCHANGER HE 18E ESW NLET 12 In MOTOR CPERATED SHUTOFF VALVE 1.WMO.713    0    ESW I EAST CONTANMENTSPRAY HEAT                  AVXuhRY      609.00      609 HALLWAY EXCHANGER ESW OWLEf SHVIQFF VALVE 1 WMO 715    0    ESW I WESt COMTANMENTSPRAY HEAT                  AUXIUARY    03%00        633 HALLWAY EXCHANGER HE-18W ESW NlET12 In MOTOR OPERATED SHUTOFF VALVE 1-WMO 717          ESW I WEST CQNl'ANMEMTSPRAY HEAT                AVX8JARY    609.00      609 HALLWAY EXCHANGER ESW OWLET SHUTOFF VALVE 1 WMO.721    0    ESW I WESf ESW SUPPLY HEADER TO AB                AUXIUARY    587.00  AB DSL RM SO PIPE EMERQ IXESEL HEAT EXCHANGER                                                TUNN SHUTOFF VALVE 0    ESWI EAST ESW SUPPLY HEADER TO AB                AUXIUARY    587.00  AB DSL RM SO PIPE EMERG IXESEL HEAT EXCHANGER                                                TUNN SHUTOFF VALVE 1-WMO.725        ESW/EAST ESW SUPPLY HEADER TO CD                  AUXNJARY    587.00  AB DSL RM SQ PIPE EMERG IXESEL HEAT EXCHANGER                                                TUNN SHUTOFF VALVE 1.WMO 727          ESW I WEST ESW SUPPLY HEADER TO CD                AUXIUARY    587.00  AB DSL RM SO PIPE BAERG IXESEL HEAT EXCHANGER                                                lVNN SHUTOFF VALVE 1-WMO.731          ESW/EASf CCW HEAT EXCHANGFR HE                  AVXUARY    609.00      609 HALLWAY 15E ESW INLET 16 In MOTOR OPERAlED SHUTOFF VALVE 1-WMO 733    0    ESW I EASf CCW HEAT EXCHANGER HE                AUXIUARY    609.00      609 HALLWAY 15E ESW OWLET SHVl'QFF VALVE 1  WMO.735        ESW I WEST CCW HEAT EXCHANGER HE                  AUXNJARY    609.00      609 HALLWAY 15W ESW NLET16 In MOTOR OPERATED SHUTOFF VALVE 1.WMO 737          ESW I WEST CCW HEAT EXCHANGER HE.                AUXaJARY    609.00      609 HALLWAY.
15W ESW OUTLET SHUTOFF VALVE 1.WMO-744    0    AFW I IESW TO WEST MOTOR DRIV AUX                TVRSNE    591.00    W MOTOR DRIVEN FEEDWATER PVM SHUTOFF 4 In MOV                                          AUX FDWTR PV 12      'I.WMO 753    0  AFWI IESW TO TURB DRIV AUXFEED PVMP                TUR SHE    591.00      TB DRIVEN AUX PP+ SHUTOFF 6 In MOTOR OPERATED                                          FDWTR PMP VALVE 1-WMQ.754  ~ 0      AFW I IESW TO EASf IAOTQR DRIV AVX              TURSNE    591.00    E MOTOR DRIVEN FEED PUMP) SHUTOFF 4 In MOTOR                                      AUXFDWTR PU OPERATED VALVE 12                    0    CQNIROLHRIPRESSURBZERTRAN Ine                  CONTANMEMT    650.00    PRESSRZR ENCL, In PRESSURE REUEF VALVENRV-1 52                                            INTERIOR CQMlROL SOLEMIQO 12      14CSCL%7    0    COMIROL AIR I PRESSURIZER TRAIN                CONTAINMENT  650.00    PRESSRZR ENCl REUEF VALVENRV.153  'A'RESSURE INTERIOR CQMIROL SQLENCO 14tV~1                  AUXBUZJXNQ VEMllLATIIONI AUX                AVXIUARY    633.00  NORM SLOWDOWN BUUXNQ VENTILATIOMENGNEERED                                          FLASHTANKRM SAFElY FEATURE EXHAUST UNIT 1 144V ~2      0  AUXBUuXNG VENTILATIOMI AUX BUILDING VEMflLATIONENG NEER ED SAFETY AUXIUARY    63%00    NORM SLOWDOWN FLASHTANKRM FEAll/RE EXHAUST UNIT2 144V~P4NE.1          AUXBUSJXNG VEMTLATKNI 'N'ATTERY                  AVXIUARY    CkkOO        633 HALLWAY ROOM EAST EXHAUST FAN 14IV~P4NE.2              AUX BVnJXNG VEMTILATIOMI TR. 'Ir              AUXNJARY    633.00      633 HALLWAY BATTERY RQQIA WESf EXHAUST FAM 14IV.AFP4II    0    TURSNE BVILDNGVEMItLATIQNI EAST                  lVRSNE    591.00    E MOTOR DRIVEN MOTOR DRIV AUXFEEDWAlER PUMP                                          AUXFDWTR PV ROOM EXHAUST FAN
 
1/5$ 6 6:53 PM                      DONALD C. COOK NUCLEAR PLANT UNIT 0 1                                            PageII 14 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR REIAY REVIEW Equip      Tnln                                                                      BuiWing    Raor Bev    Room or Row Cd 0      TURBWE BVLDNGVENlllATIQNI EAST              lUR BINE      591.00    E MOTOR DRIVEN MOTOR DR!V AUXFEED WATER PUMP                                        AUXFDWTR PU ROOM SUPPLY FAN 140/~ T1      0      TURBINE BULONG VENTLhllONI TURB              TURBINE      591.00    TB DRIVEN AUX DRIV AUXFEED PUMP ROOM SOUTH                                          FDWTR PMP EXHAUSI'AN 14IV4FP 12    0  TURBWE BVLDWQVENTLATIONI TURBWE DRIV AUXFEED PUMP ROOM NORIH TURBWE  '91.00          TB DRIVEN AUX FDWTR PMP EXHAUST FAN 140/~4(I            TURBWE BUIUXNGVENIllhllONI WEST              lURBINE    '591.00    W MOTOR DRIVEN MOTOR DR/V AUX FEED PUMP ROOM                                            AUXFDWTR PU FAN EAST'XHAUST 14IV~P.XZ    0    lURBWE BULOWQ VENTLATIQNI WEST                TURBWE        591.00  W MOTOR DRIVEN MOTOR DRIV AUX FEEDWATER PUMP                                        AUXFDWTR PU ROOM WEST EXHAUST FAN 1+ISO    1  0        HYDROGEN SIQMMER I CONTAWMENT            CONTANMENT      825.00  HVCEQ.1 FAN RM HYDROGEN SCM MER VENTLATIOMFAN 1 14IV~Z      0        HYDROGEN SKMMER I COMTANMEMT            COMTANMENT      825.00  HV4EQ1FANRM HYDROGEN SAMER VEMIIIhTIQNFAN 2 14IV4XIS 1  0      DESEL ROOM VEMIlLAQONI AB EMERQ              AUXIUARY      587.00  AB EMER OSL GEN DESEL GENERATOR VENILATIQNSUPPLY                                              RM FAN 140/4IGS.Z  0      DESEL ROOM GENERA%A/CD EMERQ                AUXIUARY      587.00  CO EMER DSL GEN DESEL GENERATOR ROOM VEMIllhllON                                              RM SUPPLY FAN 0      DESEL ROOM VENILATIOMI AB EMERG              AUXLIARY      587.00  AB EMER DSL GEH DESEL GENERATCR ROOM CX)NTROL                                              RM PANEL VENTLAllONSUPPLY FAN DESEL ROOM VEMILAllONI CO EMERQ              AVXLIARY      587.00  CD EMER OSL GEN DESEL GENERATOR ROOM CONTROL                                              RM PANEL VEMTLATIQNSUPPLY FAN '
14IV4XIX.T          DESEL ROOM VENTLATIONI AB EMERQ            AVXLIARY        587.00  AB EMER DSL GEN DESEL GENERATOR ROOM VENTllATlON                                              RM EXHAUST FAN 140/43QX 2  0    DESEL ROOM VEMILAllONICD EMERG              AUXIUARY        587.00  CO EMER DSL GEN DESEL GENERATOR VENTILATION                                              RM EXHAUST FAM 140/4GRS-1 A  0        AUXIUARYBULDWG VENTLATIONI              AUXL/ARY        809.00      4KV RM ~ OOOV CONTROL ROO DRIVE EQUIPMENT ROOM                                        SWITCHG EAR AND NVERTER AREA VENTLATlONSOUTH SUPPLY FAN 14IV4GRSQ        AVXBULDNG VENTLATIONI 4KV ROOM AB              AUXIUARY        809.00    4KV RM AB 4KV 4CV SWITCHGEAR AREA VENTILAllQN                                          SWGR SUPPLY FAN 14IV4GRS4        AUX BULONG VENTLAllON /4CV ROOM CD            AUXLIARY      809.00    4KVRM CO4KV 4KV SWITCHGEAR AREA VEMILATION                                            SWGR SUPPLY FAN 14IV4GRS4A            AUXBVLDWGVENlllATIONI CONTROL              AUXLIARY      809.00  4KV RM    OOOV SWGR ROD DRIVE EQUIP ROOM ANO WVERTER AREA VENTILATIONNORTH SUPPLYFAN 12    14IV4GRS.T    0    AVXBULDWQ VEMIXATlQNI 4KV ROOM              AUXIUARY      809.00  4KV RM    OOOV SWGR OOOV SWIICHGEAR TRANSFORMER TR-11B ANDTR.11D AREA VEMBLATIONSUPPLY 12    140/4GRS4    0,                      FAN ANOUARYBULDWG VENTLhllOHI 4KV ROOM OOOV SWITCHQEAR TRANSFORMERS AUXIUARY      809.00  4KV RM    OOOV SWGR TR11A AMDTR11C AREA VENTllhllON SUPPLY FAN 12    14IV4GRSO    0        AVXL/ARYBVLDWGVENTIIhTIONI                AUXIUARY      813 00  4KV RM MEZZANINF OQOVAC MOTOR CONTROL CENTER MEZZANINEAREA VENTLATIQNSUPPL FAN 14CV4GRX 2        AVXBULDNG VENTLATIQNI 4KV ROOM AB              AUXIUARY      809.00    4KV RM AB 4KV 4CV SWITCHGEAR AREA VENILATX3N                                            SWGR EXHAUST FAN AUX BULDNG VENTLATIQNI 4KV ROOM CD            AUXIUARY      809.00    4KV RM CO 4KV 4KV SWITCOIGEAR AREA VENTLATlON                                          SWOR EXHAUST FAN 0    AVXSUING VENTLATIQHI AB BATTERY              AUXIUARY      809.00      AB BATT EQUIP EQUIPMENT AREA BATTERY ROOM VENlllhTIONEXHAUST FAN 0    AVXBULONQ VENILATIQHI CD BATIERY              AUXIUARY      828.00        SWGR CSR EQVIPMEMTAREA BATTERYROOM VENlllhTXWEXHAUST FAN 12  1240/~.I      0    AUXBVLOWG VENTLATIQHI CCW PUMPS                AUXIUARY      833.00      ID3 HALLWAY VENTLATXWNORTH SUPPLY FAN 12  12+IVWCCP-2,  0    AUX BVLDINQVENILATlQNI CCW PUMPS              AUXIUARY      833.00      833 HALLWAY VENIILAllQNMIDDLESUPPLY FAN 12  1240M CCP4        AUX BUILDWQ VENTllhTIQHI CCW PUMPS            AUXLIARY      833.00      833 HALLWAY VEMILATIQH SOVIH SUPPLY FAN 124IV~4          SCREENHQUSE VENILATQHI UNIT 1 WEST            SCREENHOUSE      591.00    W ESSNIL SERV ESW PUMP ROOM SUPPLY VEMIILATIOH                                        WIR PMP RM FAN 12+IV~4      0  SCREENHQUSE VENILATIOHI UNIT 1 WEST          SCREENHOUSE      591.00    W ESSNTL SERV ESW PUMP ROOM SUPPLY VEMIllhTION                                        WTR PMP RM FAN 1240/~    7  0      SCREENHQUSE VENTlLATIQHI UNIT 81          SCREEHHQVSE      591.00  E ESSNTL SERV WIR EAST'SW PUMP ROOM SUPPLY                                              PMP RM VENTLATmFAN 12+IV4SW4    0    SCREENHQUSE VENILAIIQNI UNIT 1 ESW          SCREENHOUSE      591.00  E ESSNTL SERV WTR PUMP ROOM SUPPLY VENILATIOHFAN                                            PMP RM
 
1/586 6:53 PM                          DONALD C. COOK NUCLEAR PLANT UNIT 1            &#xb9;                                Page &#xb9;15 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW Equip    Tfsin    Equipment IO  RW            System I Equipment Descnpiion        Bu~ldlny      Roor Bev    Room or Row Col No 10        2    14fV~1          0                                    I CONTROL ROQht VEMIILAIIQN CONIROI.        AUIOLIARY        0SLOO    CTRL RM AR COND ROOM VEMRLAIQNNORTH AIR HANDLER                                              RM PACKAGE 10              144VWCRA-2      0    CONIROL ROOM VEMllLATKIMI COMIROL          AUIOLIARY        050.00  CIRL RM AR COND ROOM VEMlLAllONSOUTH AIR HANDLER                                              RM PACKAGE 144V~.I        0        CONTROL ROOM AIC CHILLWATER I          AUXIUARY        05ILOO  GIRL RM AR COND CONTROL ROOM NORTH LIQVO CHILLER                                            RM PACKAGE 14fV~.Z      0        CQMIROL ROOM AIC CHILLWATER I          AUXIUARY        050.00  CTRL RM AR COND COMIROL ROOhl lnSOUIM'mO CHILLER                                              RM PACKAGE 15                14IATTWB    0      250V DC IXSIRIBUAONI PlANT BATT AB        AUXIUARY        M0.00      AB BATT EQUIP 15                14IAIT423    0      250V DC QSIRIBVIQttI PLANT BATT CD        AUXIUARY        820.00    CD BATT EQUIP 15        12        14IAIT&          250VDC CONTROL ANO WSTRVMENTAllQNI          AUXIUARY        033.00      033 HALLWAY TRAN N PLANT BATTERY 10        12                    0    250VOC CONTROL ANO WSIRVMENThlIONI          AUXILIARY        OKLOO      033 HALLWAY BAlTERYCHARGER 'A'OR%'RAW BATTERY 10                  14IQAB1          250V DC QSIRIBVllQNI PLANT BATTBATT        AVXNJARY          013.00  4KV RM MEZZANWE AB BATTERY CHARGER 01 10                                      250V DC QSIRIBUllONI PLANT BATTERY        AUXRJARY        013.00  4KV RM MEZZANWE BATT~ CHARGER 02 10        12                    0    250VDC CQMIRQL ANO WSIRVMENTAIIONI          AVXUARY          OXLOO        033 HhlLWAY BATTERYCHARGER '8 FOR        tI TRAN BATTERY 10                  14ICCDI            250V DC QSTRIBUllQN I PLANT BATTERY      AUXIUARY        028.00      CD BAlTEQUIP BATT~ CHARGER 01 10                  14ICCDZ            250V DC QSIRBVDON I PLANT BATTERY        AUXIUARY        02IL00      CD BAITEQUIP BATT~CHARGER ff2 10              14XIID44NV      0    120VAC GIRL RM WSTRUMENTAIIQNQSIR          AUXILIARY        M9.00      WVERIER AREA I 12NIAC CONTROL ROOM WSIRUMEMT QSIRKKIIIONSYSTEM CH4 INVERIER 10                                0    120V DC QSIRIBVIIQNI 120V AC CONTROL        AVXIUARY        000.00      WVERIER AREA ROOM WSTRUMENT QSIRIBtmOM SYSTEM
                                                      'Ha wvERTER 10                              0      120V CIRL RM WSIRVMENTAIIQNQSIR I          AVXIUARY        MO.M      WVERIER AREA 120VAC CONTROL ROOM WSIRUMENT QSIIIIBtmQMSYSTEM CHIX INVERIER 14XIID4V4NV    0      120V GIRL RM INSTR VMEMTAIIQNDISTR I      AUXIUARY        033.00      CONIRCL RM 120VAC CONTROL ROOM INSTRUMENT QSIRIBUDOH SYSTEM CH4V WVERIER 10                              0        QESEL GENERATOR. CONTROL ANO          AUXIUARY          587.00    ABEMEROSLGEN WSIRUMEHTIAB EMERGENCY DIESEL                                              RM GENERATOR QME 150-AB INVERIER 10                              0        QESEL GENERAllQN, CONTROL AND          AUXRJARY          587.00    CD EhIER OSL GEM WSTRUMEM I IXESEL GENERATOR                                              RM INVERIER 17              MNE.15MB        0        QESEL GENERATOR CONTROL ANO            AVXIUARY          587.00    AB EMER DSL GEN WSTRUMEMTAI AB EMERG QESEL                                                RM GENERATOR 17              143ME-15GCO      0        QESEL GENERAIKXICOMTROt. ANO INSIRUMEMTI CD EMERG QESEL AUXIUARY    ., = 587.M      COEMERDSLGEN RM GENERATOR 18                  1'13        0      CONDENSATE STORAGE TANKSUPPLY I          AUXIUARY        580.00  STORAGE TANKPIPE CONDENSATE STORAGE TANKTKGZ LEVEL                                            TUNNEL WQCATOR TRANSMITTER 18                  1423.114    0      CONDENSATE STORAGE TANKSUPPLY I          AVXIUARY        58ILOO  STORAGE TANKPIPE CONOENSAIE STORAGE TANKIK42 LEVEL                                            lUNNEL WIXCATORlRAHSMITIER 18                  1+R-210                                I AUX FEEDWATER AUX FEEDWAIER TQ            AVXIUARY        021.00    EMAINSIMSTOP STEAM GENERATOR OMEN 1 FLOW                                              ENCL WQCATQR TRANSMITTER 18                                                          I AUXFEEDWAIER AUX FEEDWAIER TQ            AVXIUARY        021.00    W MAINSIM STOP SIEAM GENERATOR OME&2 FLOW                                              ENCL WOICATOR lRAHSMfTTER 18                                      AUXFEEDWAIER I AUX FEEDWATER TO            AUXIUARY        021.00    W MAINSIM STOP SIEAM GENERATOR OME~ FLOW                                                ENCI.
WDICATOR lRAHSMfTTER 18                  14'Fh240    0      AUX FEEDWATER I AUXFEEDWAIER TO            AUXIUARY        d21.00    E MAW STM STOP SIEAM GENERATO Oh!E~ FLOW                                              ENCL INQCATOR lRANSMfflER 1d                1.WDS 701            ESWI EAST ESW PUMP PP.7E QSCARGE        SCREENHOVSE        591.00  E ESSNIL SERV WIR SIRAWER OMEG4E HIGH QFFERENIIAL                                            PMP RM PRESSURE SWITCH 18                1-WOS.702                  ESWI WEST ESW PUMP PP-7W          SCREENHQVSE      501.00      W ESSNR. SERV QSCHARGE STRAWER OME44W HIGH                                          WIR PMP RM QFFERENIIAL PRESSURE SWfTCH 18          2      1  WPS.701    0          ESW I EAST ESW SUPPLY HEADER            IURBINE        580.00    ESSNIL SERV WIR PRESSURE SWITCH                                              PIPE ltWNEL 18          1      1.WPS 705      0        ESW I WEST ESW SUPPLY HEADER PRESSUR E SWflCH 10        12      I.VI$201      0      TURBWE BIXLOWGVENIKAIlQNI EAST            lURBWE          591.00      E MOTOR DRIVEN MOTOR DRIVEN ALBQUARYFEEDWAIER                                          AUX FDWTR PU PUMP ROOM EXHAUST FAN HV AFP441 lHERMALSENSOR 10                                    IURSNE BtfLQNG VENIILAIIOMI TVRSNE          IVRSNE          501.00      TB DRIVEN AUX DRnfEH ANOUARYFEED PUMP ROOM                                          FDWIR PMP NORTH EXHAUST FAN HV.AFP.T1 THERMAL SENSOR
 
1/6/96 6:53 PM                        DONALD C. COOK NUCLEAR PLANT UNIT 1              &#xb9;                              Page  &#xb9; 16 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REf/IEW Equip      Train                              System  l fquipment Oescnpbon          Buildeg Floor Eiev      Room or Raw Col 19          1                  0    TURBWE BtflUXNQVENTLATIONITVRBWE              11JRBWE    591.00        TB DRIVEN AUX DRIVEN AIBQUARYFEED PUMP ROOM                                          FDWTR PMP SOUTH EXHAUST FAN HV~-T2THERMAL SENSOR 19          12                          TVRSNE BtflUXNQVEMBLATIONI        WESl'URBINE          591.00      W MOTOR DRIVEN MOTOR DRIVEN AVXL/ARYFEEDWATER                                        AVXFDWTR PU PUMP ROOM WEST EXHAUST FAN          HV~-,
X2 THERMALSENSOR 19                              0        DIESEL BUILDWQVEMBLATIONI AB              AUXIUARY    590.00 EMERGENCY IXESEL GENERATOR ROOM VENBLATlONFANS OUTSIDE AIR THERMOSTAT 1 VTS341                DtESEL ROOM VENTLATIONI AB              AVXLIARY EMERGENCY TXESEL GENERATOR ROOM VENTLATTONFANS HV4XDOT ANO HVDQS.
1 THERMOSTAT 19                1 VT$345    0          IXESEL ROOM VEMTLABONI CO              GROV NOS    009.00        WNER PLANT EMERGENCY DIESEL GENERATOR ROOM                                          GROUNDS VENTLATlONFANS OUTSIDE AIR THERMOSTAT 19                1  VTS340                DIESEL ROOM VEMTLATlONI CO              AVXIUARY EMERGENCY TXESEL GENERATOR ROOM VENTLATlONFANS HV47GX 2 ANO HV4TGS-2 THERMOSTAT 19          12                            AUXIUARYBVLDWGVENBLAllONI                AUXIUARY    00k00        WVERTER AREA CONlROL ROO DRIVE EQtflP ROOM ANO WV AREA VENT SOUTH SUPPLY FAN HV SGRA 1A TEMPERAlURE SWITCH 12    T.VTS351      0        AUXLIARYBtflLDWGVEMBLATIONI              AUXIUARY    009.00      . CRD EQtflP RM COMIROL ROO DRIVE EQtflPMENT ROOM AND WV AREA VENT SOUTH SUPPLY FAN HV~RS-1 A TEMPERATURE SWITCH 0      AVXLIARYBtflLDWGVENTLABONI 4KV              AVXIUARY    009.00    4KV RM 00OV SWGR ROOM 000 VOLT SWGR XFRMS TR11B ANO TR110 AREA VEMl'UPPLYFAN HV~RS.7 TEMP SWITCH 19          12    1  VTS353    0  AUXIUARYBVLlXNQVENBLATIONI 000VAC              AUXIUARY    013.00    4KV RM - MEZZANWE MOTOR CONTROL CENTER MEZZANWE AREA VENT SUPPLY FAN SGRSO TEMPERATURE SWITCH 12                        AVXIUARYBVLDWQVENTLATIONI CONT                AUXIUARY    009.00        WVERTER AREA ROO DRiVE EQtflP ROOM ANO WV AREA OUTSDE HR WLET DAMPER HV~R4hD.T AND 2 TEMP SWITCH TO OVERRIDE PNEUMAllCCONTROLLER 19          12                  0      AVXLIARYBVLDWQVENTllhBONI CRIO              AVXIUARY    009.00        INVERTER AREA ANO CRDM WV AREA VENT AIR WLET DAMPER HV~R4lO-1 AND 2 TEMP SWITCH TD OVERROE PNEUMATIC CONTROLLER 19        12                        AUXLIARYBVLDWQVEMBtATIONI CNTRL                AUXIUARY    009.00      WVERTER AREA ROO DRIVE EQiflP ROOM ANO WV AREA VENT NORlH SUPPLY FAN HV~RS4A 1 A TEMP SWITCH 12    1-VTS357      0        AVXIUARYBUILDWGVEMBLATIONI                AUXIUARY  009.00          CRD EQtflP RM CONTROL ROO DRIVE EQUIPMENT ROOM ANO WV AREA VENT NORTH SVPPI.Y FAN HV~S4h        TEMPERATURE SWITCH 0      AVXLlhRYBULDWG VENTLATIONI4KV              AVXLIARY    009.00        4KV RM AB 4KV ROOM AB 4KV SWITCHGEAR AREA                                              SWGR VENTLATIONSUPPLY FAN HV~RS.2 THERMALSENSOR 19                              0      AVXLIARYBVLDWGVENTLATIONI 4KV              AVXIUARY    009.00        4KVRM CO4KV ROOM CD 4KV SWITCHGEAR AREA                                              SWGR VEMIXATCNSUPP!.Y FAN HV~RS3 THERMALSENSOR 12                          AVXLIARYBVLDWQVENTLATlONI 4KV              AVXIUARY    013.00    4KV RM MEZZANINE ROOM 0OOV SWGR XFMRS TR118 ANO TR11D AREA VENT EXHAUST FAN HV~RS.
7 TEMP SWITCH THERMALSENSOR AVXLIARYBVLOWQ VENTLATIONI 4KV              AVXIUARY    009.00    4KV RM 000V SWGR ROOM 0OOVAC SWOR XFMRS TR11A ANO TR11C AREA VENT SUPPLY FAN HV~RS8 TEMP SWITCH THERMALSENSOR 19                12.VTS 705  ~ 0        SCREEN HOUSE YENBLATIONI UNIT 1          SCREEN HOUSE  591.00        W ESSMlL SERV WEST ESSTIAL SERVCE WA1ER PUMP                                          WTR PMP RM ROOM TEMPERATURE SWITCH THERMAL SENSOR 19                12.VTS 705    0    SCREEN HOUSE VENTLABONI VI47 1 EAST          SCREEN HOUSE  591.00    E ESSNlL SERV WTR ESSEN BALSERVICE WATER PUMP ROOM                                            PMP RM TEMPERATURE SWll'CH THERMAL SENSOR
 
APPENDIX C DONALD C. COOK NUCLEAR PLANT - UNlT 2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL}, .
FOR RELAY REVIEW
 
Donald C. Cook Nuclear Plant - Unit 2 SSEL Certification:
The information identifying the equipment required to bring the plant to a safe shutdown condition on this safe shutdown equipment list is, to be the best of our knowledge and belief, correct and accurate.
Name                        Sicinature                    Daae B. A. Svensson Operations G. P. Arent Operations J. V. Ruparel                                                      Sm/5 Systems H. W. Young Systems R. C. Steele                                                      f2- ~<-%
Electrical T. R. Satyan Sharma                                                  IzaA Project Manager
 
1/8/96 12:46 PM                      DONALD C. COOK NUCLEAR PIANT UNIT 2                  &#xb9;                              Page&#xb9;2 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR RELAY REVIEW Equip      Treln  Equipment ID Rev                                                      Buildiny  Boor Bev    Room or Row Cot No 0          12    24IVWCFD.1              CONTROL ROOM VENTNAllQHI PLANT            U.2 AUXIUARY  650.00    PLANT PROCESS PROCESS COMPUTER ROOM VENTILATION                                        COMPUTER RM EXHAUST NORlH BR E DAMPER 12    24IV.ACFO.2  0        CONTROL ROOM VENTILATIONI                  U-2 AUXLAIRY  65ILQO    PLANT PROCESS COMPUTER RM PLAMI'ROCESS COMPUTER ROOM, VENBLATIOH EXHAUST SOUTH BRE DAMPER 12                        CONIROL ROOM VENBLATIQNI CONTROL              U.2 AUXIUARY  650.00    PLANT PROCESS ROOM VENT UNITS HVWCRA 1 8 HVWCRA 2                                      COMPUTER RM TO PLANT PROCESS        COMPUTER ROOM BRE DAMPER 2+IV4GSFD 1    0            OtESEL RQQM VENTNABOHI CD              U-2 AUXIUARY  587.00  CO EMER OSL GEN EMERGENCY DESEL GENERAlOR ROOM                                                RM VENBLATTONSUPPLY FlRE DAMPER 24IV4GSFD.2    0            DESEL ROOM VENBLATIONI AB EMERGENCY OtESEL GENERATOR ROOM
                                                                                      ~  AUXNJARY  587.00  AB EMER OSL GEN VEMTlLABOHSUPPLY ARE DAMPER 24IV  OX'.1  0            DESEL ROOM VENBLATIONI CO              U-2 AUXIUARY  587.00  CO EMER OSL GEN EMERGENCY DESEL GENERATOR ROOM                                                RM VENBLATlOHEXHAUST BR E DAMPER 0            DESEL RQQM VENBLABONI AB                U-2 AUXNJARY  587.00  AB EMER DSL GEN EMERGENCY DESEL GENERATOR ROOM                                                RM VENBlhllQHEXHAUST BRE DAMPER ESSENTIAL SERVCE WAlER I EAST            SCREENHQUSE    501.00  E ESSNTL SERV WTR ESSENBAL SERVCE WATER PUMP PP-7E                                            PMP RM DISCHARGE SIRAINER 24ME~        0          ESSENBAL SERVCE WATER I WEST            SCREENHOUSE    591.00    W ESSMTL SERV ESSENBAL SERVCE WATER PUMP PP-7W                                          WTR PMP RM DSCHARGE SlRAINER 24T.TQOAB    0    OtESEL COMBUSBQN AIR I AB EMERGENCY              GROUNDS      600.00,    INNER PLANT DESEL AIR INTAKEFN.TER                                            GROUNDS 24T 1OOGD          DIESEL COMBUSTIQH ANTI CO EMERGENCY              GROUNDS      600.00      INNER PLANT DESEL AIR INTAKEFILTER                                            GROUNDS 24T 115AB          DESEL LUBE DL I AB EMERGENCY DESEL              AUXNJARY    570.00    AB EMER OSL LUBE BYPASS LUBE OIL BLTER                                              DL PIT 24T 1 18CD        DESEL LUBE OIL I CO EMERGENCY DESEL              AUXIUARY    570.00    COEMERDSLLUBE BYPASS LUBE ON. FILlER 2~                  ELECTRCAL DSTRIBVBON, SOOVAC I SQQVAC MOTOR CONTROL CENTER AIBA AUXIUARY    587.00 QIL PIT 5ST HALLWAY 0        ELECIRCAL DSTRIBVBON, SQOVAC I              AUXNJARY    587.00      587 HALLWAY SQQVAC MOTOR CONTROL CENTER AM) 12                      250VDC CONTROL AND NISTRUMENTATIONI              AUXNJARY    5S7.00      587 HALLWAY CONTROL CENTER VALVE 2+BOA                ELEClRICAL DSTRIBVBOH, SOOVAC I            AUXNJARY    587.00    ABEMEROSLGEN 2~                SOOVAC MOTOR CONTROL CENTER ABACA ELECTR CAL OISTRIBVBQN, SOQVAC I 8QQVAC MOTOR CONTROL CENTER ABO8 AUXNJARY    SS7.00 RM AB EMER DSL GEN RM 0          ELECTRICAL DSTRIBUBQN, SQQVAC I            AUXNJARY    587.00    CO EMER OSL GEN SQOVAC MOTOR COMTROL CENTER ABOC                                              RM 0          ELECTRICAL DSTRIBUTIQN, SOOVAC I            AUXIUARY    587.00    COEMEROSLGEN SQOVAC MOTOR CONTROL CENTER ABO4                                              RM 2~V%                  ELEClRCAL DSTRIBVBON, eXIVACI              AUXNJARY    587.00      587 HALLWAY SOOVAC VALVECONTROL CENTER ABYE 2~VD                  ELECTRICAL DSTRIBVBON, 600VAC I            AUXIUARY    587.00      587 HALLWAY SQQVAC VALVECONTROL CENTER ABV4 0          ELECTRICAL DSTRIBVDON. SQOVAC I            AVXIUARY    833.00      833 HALLWAY SOQVAC MOTOR COMTROL CENTER ALLA ELECTRCAL DSIRIBUBQM, SQQVAC I              AUXIUARY    SM.OO        633 HALLWAY SQQVAC MOTOR CONTROL CENTER AM4 2~%                  ELECTRICAL DSTRIBUBQN, 600VAG I            AUXNJARY    800.00      609 HALLWAY 2~                SQOVAC VALVECONTROL CENTER AZVA ELECTRCAL OISTRIBUBON, SQOVAC I SQQVAC MOTOR CQMTROL CENTER EZC.A AUXIUARY    613.00        4KV ROOM MEZZANINEAREA 2~GB                  ELECTRICAL DSTRIBVBON, SOOVAC I            AUXIUARY    613.00        4KV ROOM eXIVACMOTOR CONTROL CENTER EBB                                          MEZZANINEAREA 2~GO                  ELECTRICAL DSTRIBUTION, SQOVAC I            AUXNJARY    SIILQO        4KV RQQM 800VAC MOTOR CONTROL CENTER EZC4                                        MEZZANINEAREA 0          ELECTRCAL DSTRIBUBON, 600VAC I              AUXIUARY    613.00        4KV ROOM SQOVAC MOTOR CONTROL CENTER            EZ~                              MEZZANINEAREA 24%A                  ELECIRCAL DSTRIBUTION, SQQVAC I          SCREENHQUSE    594.00    TRAVELSCRN MCC 2~        0 SQOVAC MOTOR CONTROL CENTER PS%
EUCTRCAL DSTRIBVBQN, SQQVAC I SQQVAC MOTOR COMTROL CENTER PSO SCREENHOUSE    594.00 UPPER RM TRAVELSCRN MCG UPPER RM 241A1                ELECTRCAL DSIRIBVBON, SXNAC I              AUXIUARY    809.00  4KV RM ~ SOOV SWGR REACTOR ROO CONTROL SOUTH MOTOR                                              AREA GENERATOR SET CRDMG.2S SUPPLY BREAKER 2-21A10          ELEClRCAL DSTRIBVBOH, SOOVAC I WEST              AUXIUARY    609.00  4KV RM  SQOV  SWGR TURBNIE AUXUARYCOOUNG WATER                                                AREA PUMP PP-14W SUPPLY BREAKER 2-21A11              ELECTRICAL DSTRIBVBON, SXIVACI              AUXNJARY    SQQ.QO  4KV RM SOOV SWGR SQQVAC BUS 21 A SUPPLY BREAKER                                            AREA 241 A4    0        ELECTRCAL DSTRIBVBQILSQQVAC I                AUXNJARY    600.00  4KV RM SQQV SWGR SOUTH PLANT UGHBNG TRANSFORMER lR.                                              AREA LTG4S SUPPLY BREAKER 2-21 AC          ELECBIICALDSTRIBUBQN, SQOVAG I SOOV              AUXNJARY    SOQ.OO  4KV RM SOOV SWGR BUS 21 A TO SQOV BUS 21C TIE BREAKER                                        AREA 2%1 810    0    ELECTRICAL DSTRIBUTQN, SQOVAC I PLANt            AUXIUARY    600.00  4KV RM SOOV SWGR ANT COMPRESSOR OMELET SUPPLY                                              AREA BREAKER
 
1/mg6 12:46 PM                      DONALD C. COOK NUCLEAR PLANT UNIT 2            &#xb9;                            Page&#xb9;3 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW
)
EeAp      7    ENipment IO Ree                                                    Buildey Boor Elev  Room or Row Col No 241 B11              ELEClRCAL QSTRIBVBQN. NOVAC I          AUXIUARY  009.00  4KV RM 000V SWGR 000VAC BUS 21 B SUPPLY BREAKER                                    AREA 2-21 B12              ELECTRICAL QSTRIBUTION, NQVAC I        AUXIUARY  009.00  4KV RM 000V SWGR SOUTH NONESSENBAL SERVCE WATER                                        AREA PUMP PP45 SUPPLY BREAKER B13  0          ELECTRICAL QSlRIBVBON, CXWACI          AUXIUARY  009.00  4KV RM 0OOV SWGR TVRBQIE ROOM BIDUCTlON HEABNG,                                      AREA STRESS REUEF ANO BOLT HEAlERS SUPPLY BREAKER ELECTRICAL QSTRIBUTIQN, CXWACIOQOV          AUXIUARY  009.00  4KV RM NOV SWGR MOTOR CONTROL CENTERS TBGJTW ANO                                      AREA TBPJBI SUPPLY BREAKER 0      ELECTRICAL DSTRIBUTlQN, 0QOVACI EAST        AUXIUARY  009.00  4KV RM ~ 000V SWOR TURBQIE AUXIUARYCOOUNG WATER                                        AREA PUMP PP-1 4E SUPPLY BREAKER ELECBTCAL QSTRIBVBON, 000VAC I 000V        AUXIUARY  N9.00    4KV RM 000V SWGR BUS 21 B TO CXIV BVS 21 0 TK BREAKER                                AREA 0      ELECTRiCAL QSTRIBUTION, 000VACI 000V        AVIOLIARY  009.00  4KV RM 000V SWGR BUS 21 C SUPPLY BREAKER                                      AREA 241CTZ    0          ELECTRCAL DSTRIBVBQILCXWAC I            AUXLIARY  009.00  4KV RM NOV SWGR SOUIH SPENT FUEL PIT PUMP 124%41 S                                    AREA 2'.ZI SUPPLY BREAKER ELECTRCAL DISTRIBVBOIL000VAC I          AUXLIARY  009.00  4KV RM CXW SWGR REQPROCABMG CHARGING PUMP PP~                                        AREA SUPPLY BREAKER 241C14    0      ELECTRICAL QSTRIBUBQM. NOVACI RRE          AWUARY    009.00  4KV RM 000V SWGR PROTECBON WATER IOGH DEMANDPUMP                                        AREA PP 11 SUPPLY BREAKER ZmCI0                ELECTRCAL QSlRI BUTION, 000VAC I        AVIARY    N9.00    4KV RM 600V SWGR NOVAC MOTOR CONTROL CENTER TBCCM                                        AREA SUPPLY BREAKER ZWC17      0          ELECIRICALOISTRIBVBQtt, 6OOVAC I        AUXXJARY  N9.00    4KV RM 000V SWGR NORTH NONESSENTUK SERVCE WAlER                                        AREA
                                            'UMP PP4M SUPPLY BREAKER 241C10    0      EUCTRCAL DSTRIBVBON, 6QQVAC I MANI          AUXIUARY  609.00  4KV RM 000V SWGR TURBQIE AVIARYLUBE OL PUMP OT-201                                      AREA SUPPLY BREAKER 241 C2    0        COMTAQIMENTPOLAR CR I ELECTRCAL            AVXIUARY  609.00  AIR COOLED DRCUIT DSTRIBVT                                      BREAKER {METAL 0          ELECTRICAL DSTRIBUTIQN CXWACI          AUXNJARY  609.00  4KV RM CXIVSWGR aRCULABNG WATER TRAVELatG SCREEN                                        AREA SOUTH WASH PUMP PP.15S SUPPLY BREAKER 2                0      ELICTRCALDSTRIBVTION, 0QQVACI PLANT          AUXIUARY  N9.00    4KV RM ~ 000V SWGR hMO CMTMTSTANDBYIJGHBNG                                          AREA TIIAMSFORMERTRJ.TG4 SUPPLY BREAKER ELECTRICAL DSTRIBUBQN. 0QQVAC I MAIN        AUXIUARY  009.00  4KV RM NOV SWGR AND SPARE TRANSFORMER AUXXJARIES                                      AREA
                                          'NORMALQSTRISUTION CAENET TCSN SUPPLY BREAKER 2-21 01          ELECTRICAL QSTRIBVBON, 000VAC I 000V        AUXIUARY  N9.00    4KV RM NOV SWGR BUS 21 0 SUPPLY BREAKER                                      AREA ZW01 0    0          ELECTRCAL DSTRIBUBQN, 0NVAC I            AUXIUARY  009.00  4KV RM 000V SWGR NORTH PLANT UGNBNG TRANSFORMER                                        AREA
                                                'R4  TGJIM SUPPLY SR EAKER 241 013              ELECTRICAL DSTRIBUBQM. 0OOVAC I          AUXIUARY  009.00  4KV RM NOV SWGR REAClOR ROD CONlROL NORTH MOTOR                                        AREA GENERATOR SET CRDMG.M SUPPLY BREAKER 0          ELECTRICAL DISTRIBUTION. CXWAC I        AUXIUARY  N9.00    4KV RM 000V SWGR COMTA0IMEMTUGt{BNGTRANSFOIUJER                                        AREA lR4 TG.I 0 SUPPLY BREAKER 241 09  0      ELECTRICAL DSTRIBVBQN, 600VACI MAIM          AUXIUARY  N9.00    4KV RM ~ 000V SWGR AND SPARE TRANSFORMER AUXIUARIES                                      AREA EMERGENCY DSTRIBUBON CASNET TCSE SUPPI.Y BREAKER 242 4IYA  0  " > REACTOR TRIP BREAKER {RQO CONTROL 6          AVXIUARY  009.00      CRD EQUIP RM INST.) I REACTOR ROO CONTROL TRA REACTOR TRIP BYPASS CIRCUIT BREAKER 0      REACTOR TRIP BREAKER {RQO CONTROL 6          AUXIUARY  009.00      CRD EQUIP RM 9IST.) I REACTOR ROO COMIROLTRAIN B REACTOR TRIP BYPASS aRCtXT BREAKER 2424ITA              ROO COMTROI. AND INSTRUMENTATIONI          AUXIUARY  009.00      CRD EQVIP RM REACTOR ROD CONTROL TRAN TRIP aRCUIT BREAKER
                                                                          'A'EACTOR 0        ROO CONTROL AND QISTRUMEMTABQMI            AUXIUARY  009.00      CRO EQUIP RM REACTOR ROO COMTRQL TRAOI 'P REACTOR TRIP CIRCUIT BREAKER Z-TZIA1  0          ELECTR CAL QSTRIBVBQN, 4'I 60VAC I        AVXIUARY  N9.00      4KV RM AB 4KV SOVIH SAFETY OIJECBOM PUMP PP-20S                                  SWGR AREA SUPPLY BREAKER 2.121 A10  0      ELECTRICAL QSTRIBUTIQN. 4 I00VACI000V        AUXIUARY  N9.00      4CVRM AB4KV BUS 21 A SUPPLY TRANSFORMER TR21A                                  SWGR AREA SUPPLY BREAKER 2-121 A11  0        ELECTRICAL OISTRIBVBON. 4100VAC I AB        A{DQLIARY  009.00    4KV RM AB 4KV EMERGENCY DIESEL GENERATOR TO 4KV                                    SWGR AREA BUS T21A SUPPt.Y BREAKER 2 T21A12              ELECTRICAL DSTRIBVBQM, 4100VAC I          AUXNJARY  009.00    4KV RM AB 4KV aRCUIT BREAKER FROM 89KV TO BUS TZIA                                  SWOR AREA
 
1/808 12:46 PM                    DONALD C. COOK NUCLEAR PLANT UNIT 2                        &#xb9;                        Page  &#xb9;4 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR RELAY REVIEW EQIAP      Train 8          1                        ELECTRICAL OISTRtBUTION, 4100 VAC I                    AUXIUARY  009.00    4KVRM ABBEY WEST CONTANMENTSPRAY PUMP PP4W                                                SWGR AREA SUPPLY BREAKER 8          1                  0  ELECTRCAL DISTRIBUBON, 4100 VAC I 4KV                    AUXIUARY  009.00 BUS 721 A TO 480V PRESSURIZER HEATER BUS SUPPLY TILANSFOIIMER TR21PHA SUPPLY BREAKER ELECTRICAL DSIRIBUBON 4'I 00VAC I 41$                  AUXIUARY  009.00  '41$ RM A84KV BUS 2A TO BUS 721 A llE BREAKER                                            SWGR AREA 2.121 81  0  ELECTRICALQSTRtBUBON, 4160VAC I 4KV                                          41$ RM A841$
BUS 28 TO 41$ BUS 721 8 ltE BREAKER                                          SWGR AREA 2l2182    0      ELECTRICAL QSTRIBUBON, 410OVAC I                    ANQUARY    009.00    4KVRM A84KV CIRCUIT BREAKER FROM 09KV BUS TO BUS                                          SWGR AREA l21 8 2-721 84        ELECTRICALQSBLIBUBOH, 4100VAC I AB                    ALSQUARY  009.00    4KVRM  A84I$
EMERGENCY DIESEL GENERATOR TO 41$                                              SWGR AREA BUS 121 8 SUPPLY BREAKER 2.721 C1      ELECiRICALQSTIOBUBOM, 4100VAC I 41$                    AUXIUARY  009.00    4ISRM CD%V BUS 2C TO 4KV BUS l21 C 7IE BREAKER                                          SWGR AREA ELECIRICALQSIRIBUBON, 4100V AC I                    AUXIUARY  009.00 4KVRM 000VSWGR CIRCLXT BREAKER -4KV FROM 09KV TD                                              AREA BUS l21 C 2-727 CQ  0    ELECTRICAL QSTRIBUBON, 4100VAC I CO                    AUXIUARY  009.00 EMERGENCY QESEL GENERATOR TO 4I$
BUS 721 C SUPPLY BREAKER 2.121 D1  0    ELECTRICAL DLSlRIBUBON, 4160VAC/4KV                    AUXIUARY  009.00    4KVRM CD41$
EMERGENCY POWER BUS EP TO 4KV BUS                                              SWGR AREA 721 8 SUPPLY BREAKER 2.721 D12  0    ELECIRICALQSIRIBUBON, 4100VAC I 4KV                                          4KVRM CD4I$
BUS 2D TO 4KV BUS 721 D 71E BREAKER                                          SWGR AREA 2.72182  0  ELECTRICAL QSBtSUBOH, 4100VAC/000V                      AUXILlhRY  009.00    4KVRM CD4KV BUS 21D SUPPLY TRANSFORMER 7R21D                                              SWGR AREA SUPPLY BREAKER ELECTRICALQSBLIBUBON, 41 60 VAC I                    AUxa/ARY  009.00    4ISRM CD4KV EAST CONTANMEMTSPRAY PUMP PP4E                                                SWGR AREA SUPPI.Y BREAKER 2.721 DS  0    ELECTRICAL QSTRIBUBON PANEL, 4100                      AUXIUARY  009.00    4KVRM CD4I$
VACI NORTH SAFElY NJECBOH PUMP PP                                              SWGR AREA 20N SUPPLY BREAKER 0    ELECTRICAL QSTRIBUTION, 4180VAC I CO                    AUXIUARY  609.00    4KVRM CD4I$
EMERGENCY QESEL GENERATOR TO 41$                                              SWGR AREA BUS 121 D SUPPLY BREAKER 0  ELECTRICAL DISBIIBIfllOt44100 VAC /4KV                  AUXIUARY  009.00    4KV RM CO 4KV BUS l21D TO 480V PRESSURIZER HEATER                                            SWOR AREA BUS SUPPLY TILAMSFORMER TR21PHC SUPPLY BREAKER 0    12OV CONTROL ROOM NSLRUMENTABON                                          4KVRM 000VSWGR QSiRIBUBON I 10KVATRANSFORMER                                                  AREA CONSTANT VOLTAGE 2CRIDaCVT    0      120VAC DISTRIBUTIONI 120V AC CR          INSl'STR 4KVRM 600VSWGR CHa ISOL CONf VOLT                                                  AREA TRANSFORMER 2CRIOJQCVT        120V COMIROL ROOM NSTRUMEMTATION                        AUXIUARY  009.00  4KV RM ~ 0OOV SWGR QSTR /10KVAISOUM//ER - CONSTANT                                                AREA VOLTAGE TRANSFORMER 2CRIO4VCVT  0    120V COHTROL ROOM INSTRUMEHfATION                                        4KVRM 000VSWGR QSTR /10KVAISOUMITER CONSfhHT                                                  AREA VOLTAGE TRANSFORMER 0        DESEL GEMERABOM, CONTROL ANO                        AUXIUARY  587.00 NSIRUMENTATKNIAB EMERGENCY DIESEL GENERATOR OME.150 AB FIELD FlASH CIRCUIT TRANSFORMER 0        QESEL GENERABQtL COMIROL AMD                        AUXIUARY  587.00  CO EMER OSL GEN NSTRUIJENTATION I CD EMERGENCY                                                  RM DtESEL GENERATOR OME-15OCD FIELD FLASH CKT TRANSFORMER 2-TR21A        ELECTRICAL DSTRIBUBON, 0OOVAC I 0XW                                        4KVRM 000VSWGR BUS 21 A SUPPLY lRANSFOR M ER                                                AREA 2.7R21 8  0    ELECTRICAL QSTRIBUBON, eXIVACI OOOV                      AUXNJARY  609.00  4KVRM 0OOVSWGR BUS 21 8 SUPPLY TRANSFORMER                                                  AREA 2-TR21C        ELEClRICALDSTRIBUBON. 600VAC I 00OV                      AUXIUARY  009.00    4I$ RM CD4KV BUS 21 C SUPPLY TRANSFORMER                                                SWGR AREA 2.7R21  0  0    ELECTRICAL DSTRIBUBON, 0OOVAC I 00OV                    AUXIUARY  009.00  4KV RM ~ 6OOV SWGR BUS 21 8 SUPPLY TRANSFORMER                                                  AREA 12    12~%1 S            SPENT FUEL PIT COOUNG/CLI~P I                      l&2AUXIUARY 009.00    SPENT FUEL PIT SOUTH SPENT FUEL PIT PUMP                                            HEAT XCHGR RM 2~.10E    0      COMPONEMf COOUNG WATER I                              AUXIUARY  609.00      009 HALLWAY COOUNG WATER PUMP EASI'OMPONEMf 2~-10W,    0      COMPONENT COOUNG WATER I WEST                          AUXIUARY  009.00      009 HALLWAY COMPONENT COOUNG WATER PUMP 2~-26N    0        SAFElY NJECBON I NORTH SAFETY                        AUXIUARY  587.00  N SAFETY NJ PMP INJECTION PUMP                                                        RM 2~.268    0        SAFETY NJECBON I SOUTH SAFETY                        AUXIUARY  587.00  S SAFETY NJ PMP NJEC7ION PUMP                                                          RM 0      AUXIUARYFEEDWATER I EAST MOTOR                          TURBNE  591.00    E MTR DRIV AUX DRIVEN AUXIUAAYFEEOWATER PUMP                                              FEEDWTR PMP 0      AUXIUARYFEEDWATER I WEST MOTOR                          lURBNE  591.00  W MTR DRIVEN AUX DRIVEMAUXIUARYFEEDWATER PUMP                                                  FDWTR PMP 249 A    0    AUXIUARYFEEDWATER/7URBNE DRIVEN                          lURBINE  591,00    TB DRiVEN AUX AUXIUARYFEED PUMP                                                    FDWTR PMP
 
1/8/96 1246 PM                          DONALD C. COOK NUCLEARPLANT UNIT 2          &#xb9;                            Page&#xb9;5 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW ErtoipmsmiO Rev              System/ Equi pmsnt Doscnpeon                          Room or Row Col No 2~~        0        BORON MAKEUP (CVCSI I BORIC ACID STORAGE TANKS11LANSFER PUMP &#xb9;3 AUXIUARY  SS7.00  BORIC AQO STQR TANKAREA 2~~                                            I BORON MAKEUP (CVCSI BORIC AQD SLORAGE TANKS TRANSFER PUMP &#xb9;4 ALBSUARY  587.00  BORIC ACID Sl'OR TANKAREA 12                  0          CHARGNQ (CVCS) I RECPROCATNG        ALBQUARY  587.00    REQPROCAllNG CHARGING PUMP                                    CHARQ PMP RM 0        CHARGNG (CVCSI I EAST CENTRIFUGAL      AUXNJARY  587.00    E CENTRIFUGAL CHARGING PUMP                                  CHARG PMP ROOM 2PP40W      0      CHARGNG (CVCS) I WEST CENTRIFUGAL      AUXIUARY  587.00    W CEMRIFUGAL CHARGNQ PUMP                                    CHARG PMP RM 0      CONIROL ROOM HR CONDIDONNQ CHILL        AUXIUARY  850.00  CTRL RM HR CONQT WATER I CONIROL ROOM AIR                                      RM COND(IKNNQ NORTH CteLL WAlER CIRCULA11ON PUMP 0      CONIILOLROOM AIR CONDITONNQ CISLL        AUXIUARY  850.00 WATER I CONTROL ROOM HR CONOIDNNQ SOUTH CteLL WATER CSLCULATION PUMP 24T 10$ h81  0      QESEL FUEL QL I AB EMERGENCY QESEL      AUXIUARY  587.00 FUEL QL TRANSFER PUMP &#xb9;1 24T.1 QM82    0  ." i DIESEL FUELOIL/ABEMERGENCY DIESEL        AUXIUARY  587.00  AB EMER OSL FUEL FUEL Oit. lRANSFER PUMP &#xb9;2                              OIL XFER PMP 247 105CO1,    0      QESEL FUEL QL I CD EMERGENCY QESEL      ALBGUARY  587.00  CD EMER DSL FUEL FUEL OIL TRANSFER PUMP &#xb9;1                              OIL XFER PMP 5        =-
2  247.1 OSCD2            QESEL FUEL OIL I CD EMERGENCY QESEL      ALBQUARY  587.00 FUEL OIL 'lRANSFER PUMP &#xb9;2 5            'I  24T.111~          i DIESEL LUBE OL I AB EMERGENCY QESEL      AUXIUARY  579.00  AB EMER DSL, LVBE LUBE CIL BEFORE AND AFTER PUMP                                  Oil. PIT 24T 11140    0      QESEL LUBE OIL I CD EMERGENCY QESEL      AUXIUARY  570.00  CO EMER DSL LUBE LUBE OIL BEFORE ANO AFTER PUMP                                  QL PIT 24T.117~            QESEL LUBE QL I AB EMERGENCY QESEL        ALBQUARY  570.00  AB EMER OSL LUBE LUBE QL HEATER OT.11tLAB PUMP                                  OIL PIT 5            2    24T 117CD    0      QESEL LUBE OIL I CD EMERGENCY QESEL      ALBQUARY  570.00  CD EMER DSL LUBE LUBE OIL HEATER OT 118CO PUMP                                QL PIT 5            1    24T 11048    0      DiESELLUBEQLIABEMERGENCYQESEl            AUXIUARY  570.00  AB EMER OSL LUBE BYPASS LUBE OIL FILTER OT 118.AB PUMP                            OIL PIT 5            2    24T 110CD    0      QESELLVBEQLICDEMERGENCYQESEL            AUXIUARY  570.00  CO EMER OSL LUBE BYPASS LUBE OIL RL1ER OT-1 18CD PUMP                              OIL PIT 5            1  247.1 30A81    0      QESEL JACKET WATER I AB EMERGENCY      AUXXJARY  587.00  AB EMER DSL GEN QESEL JACKEI'WATER PUMP &#xb9;1                                    RM 24T 130482    0      QESEL JACKET WATER I AB EMERGENCY      AUXSJARY  587.00  AB EMER DSL GEN QESEL JACKET WATER PUMP &#xb9;2                                    RM 247.1 30CD1            QESEL JACKET WATER I CD EMERGENCY      AUXIUARY  587.00  CD EMER DSL GEN QESEL JACKET WATER PUMP 1                                    RM 5 .          2  24T-130CO2    0      QESEL JACKET WATER I CD EMERGENCY      ALBSUARY  587.00  CD EMER DSL GEN QESEL JACKET WATER PUMP 2                                    RM 5            1    247.1 3548    0      QESEL JACKET WATER I AB EMERGENCY      AUXIUARY,SS7.00    AB EMER OSL GEN QESEL ALBSUARYJACKET WATER PUMP                                    RM 5            2  24T 135CO      0      QESEL JACKET WATER I CO EMERGENCY      ALBQUARY  587.00  CO EMER OSL GEN DIESEL ALBOUARYJACKET WATER PUMP                                    RM RESIUAL HEAT REMOVAlI EAST                            EAST RHR PUMP RM ILESCUAL HEAT REMOVALPUMP e            1    2PP45W      0            RESOUAL HEAT REMOVALI WEST          AUXIUARY  573.00    W RHR PMP RM RESIDUAL HEAT REMOVALPUMP 8            2                  0          ESSENllAL SERVICE WA1ER I EAST                          E ESSNIL SERV WTR ESSEMIAL SERVICE WATER PUMP                                  PMP RM 8            1                  0          ESSENRAL SERVICE WATER I WEST      SCREENHOUSE 501.00    W ESSNTL SERV ESSENTIAL SERVICE WATER PUMP                              WTR PMP RM CONTANMENTSPRAY I EAST          ALBGUARY  573.00  E CONT SPRAY PMP CONTAINMENTSPRAY PUMP                                        RM 8            1      2PP4W      0              CONTANMENTSPRAY I WEST            AUXIUARY  573.00  W CONT SPRAY PMP CONTAINMENTSPRAY PUMP                                        RM 24CR 401    0
                                              &#xb9;1 BL~
NUCLEAR SAMPUNG I STEAM GENERATOR SAMPLE DSR401 CONTANMENTISOLATION VALVE AUXIJARY  501.00 0      NUCLEAR SAMPUNQ I STEAM GENERATOR        AUXSJARY  501.00
                                              &#xb9;2 BLOWDOWN SAMPLE DSR402 CONTANMENTISOLATION VALVE 7            1                        NUCLEAR SAMPUNQ I STEAM GENERATOR        ALBOUARY  501.00        VESllBULE
                                              &#xb9;3 BLOWDOWN SAMPLE DSR403 CONTAINMENTISOLATION VALVE 24CR 404    0      NUCLEAR SAMPUNG I SLEAM GENERATOR        ALBQUARY  501.00
                                              &#xb9;4 BLOWOOWN SAMPLE OSR4N CONTANMENT ISOLATIONVALVE 7            2    24yCR410 BL~
SLOWDOWN I STEAM GENERATOR OME4-1 CONTANMENTISOLA11ON VALVE ALBSUARY  501.00        STARTVP BLOWDOWN FLASHTANKR M 7            1    24CR~        0      BLOWDONNI STEAM GENERATOR OME4.2          AUXLlARY  501.00        STAR TVP BLOWDOVNCONTAINMENTISOLATION                                  SLOWDOWN VALVE                                      FLASHTANKR M 7            1    24CR 430    0      SLOWDOWN I STEAM GENERATOR OME~          ALBQUARY  501.00        STARTUP BLOWDOVWCONTAINMENTISOlhTION                                  BLOWDOWN VALVE                                      FLASHTANKR M SLOWDOWN I STEAM GENERATOR OME~          ALBQUARY  501.00        STAR TUP BLOWDNVNCONTAINMENTISO(hllON                                  BLOWDOWN VALVE                                      FLASHTANKR M 7        12      24RVMT      0      STEAM UNE DRANS I MHN STEAM LEADS        AUXIJARY  800.00 CONDENSATION DRAIN TANKTK 150 GULLET SHUTOFF VALVE
 
1/N96 12:46 PM                        DONALD C. COOK NUCLEAR PLANT UNIT 2                  &#xb9;                              Page &#xb9;6 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR REIAY REVIEW Equip      Troh                                Sysurm  I Equi pmont Oeooripbon              Buiknn0 Fhor Eiev    Room or Row Col 7          1      2+RV447    0        AUXNJARYFEEDWATER I WEST MOTOR                  lURBitIE    501.00  W MTR DRIVEN AVX DRIVEN AUXIUARYFEED PUMP PP4W                                            FOWTR PMP EMERGENCY 1 h HR OPERATED LEAKOFF GLOBE VALVE 241(V.257  0        AUXIUARYFEEDWATER I EAST MOTOR                  TURBINE    591.00    E MTR DRIV AUX DRIVEN AVXIUARYFEEDWATER PUMP PP                                          FEEDWTR PMP 3E EMERGENCY 1 h AIR      OPERATED'EAKOFF VALVE 12      2+RV.258    0    ALOQUARYFEEOWATER I TURBWE DRIVEN                  TURBINE    501.00    TB DRIVEN AVX AUXXJARYFEED PUMP EMERGENCY 1 In                                          FDWTR PMP AIR OPERATED LEAKQFF GLOBE VALVE 12      2~414      0      NITROGEN (REACTOR PLANT SERVICEI I              AUX8JARY    501.00        SfARTVP NIIROGEN SUPPLY TD ACCUMV(ATOR                                          SLOWDOWN TANKS CONTAWMENTISO(ATION VALVE                                          FLASHl'ANKRM 12      2&RYE      0      NITROGEN (REACTOR PLANT SERVICE) I            coNfhwMENT    5(NLoo  ANNULUs, QUAD NQ.
taTROGEN SUPPLY TD ACCUMULATOR                                                2 TANIO(S VENT VALVE 12    24IV~R410.1                AUIOUARYBUILDINGVENDLATIONI                  AUXLIARY    600.00  4KV RM 6OOV SWGR CONTROL ROO DRIVE EQUIPMENT ROOM                                              AREA ANO WVERTER AREA VEND(ATION RECOtCULATWG AIR WLET DAMPER 12    24(V4GRJJDG    0          AUXNJARYBUNJXNG VENT%ATIONI                  AUxnJARY    609.00  4KV RM 6OOV SWGR CONTROL ROO DRIVE EQ(&#xb9;PMENT ROOM                                              AREA ANO WVERTER AREA VEND(ATION OVTSDE AIR If%ET DAMPER 24RV.112  0        NITROGEN (REACTOR PLANT SERVICEI I            CQNTAWMENT    512,00      ACCUMULATOR ACCVMULATORTANK0M&5 1 NITROGEN                                            TANK<<1 AREA SUPPLY/VENT VALVE 24(V 122  0  .      Nm(QGEN (REATOR PLANT SERVICE) I            CONTAINMENT  51 2.00    ACCUMULATOR ACCVMU(ATOR TANKOME&2 NffROGEN                                            TANK&#xb9;2 AREA SUPPLYIVENT VALVE 12  i    24(V 132  0        NRROGEN (REACTOR PLANT SERVICE) I              CONTAWMENf    612.00      ACCUMULATOR ACCUMUlATORTANKOME4G NITROGEN                                            TANK&#xb9;3 AREA SUPPLYIVEMTVALVE 12      24(V.142  0      t<<TROGEN (REACTOR PLANT SERVICE) I              CONTAWMENT    512,00      ACCUMULATOR ACCUMULATOR TANKQME44 NTROGEN                                              TANK&#xb9;4 AREA SUPPLY/VENT VALVE 24tV 149  0            RESDUAL HEAT REMOVALI WEST                CONTAWMENT    512.00    HV~Q 2 FAN RM RESDVAL HEAT REMOVALTD REACTOR COOLANTLOOPS N2 ANO N3 0.75 h AIR OPERATED TEST LOB VALVE 24(V 150                RESIDUAL HEAT REMOVALI EAST                CONTAWMENT    61200      HV~Q.2 FAN RM RESOVAL HEAT REMOVALTO REACTOR CO(KANTLOOPS &#xb9;1 AND &#xb9;4 0.75 In AIR OPERATED TESl'ALVE 24(V 156                    RESDUAL HEAT REMOVALI                  CONTAWMENT    508.00  ANNULUS, QUAD NQ.
ACCUMULATORTANKOME4 1 IL75 IN AIR                                                1 OPERATED OVf(ET ANO SAFETY WJECllON TQ RC lOOP NI COLO LEG TEST VALVE 24tV 157    0        RESDUAL HEAT REMOVALI WEST RHR
                                        ~ 'AND SAFEIY WJECllON TO REACTOR CQNTHNMENT    51 2.00    HV~2 FAN RM COOLANT LOOPS <<2AND <<da75 W HR OPERATED TESf VALVE 24tV 158    0    RESDUAL HEAT REMOVALI EAST RHR ANO              CONTAINMENl'12.00        HV~Q.2 FAN RM NORllt SAFElY WJECDON TO REACTOR ComANT PUMPS <<1          He  <<4 a7s IN AIR OPERATm TEST VALVE NRV.166                    RESOVAL HEAT REMOVALI                  CONl'AWMENT    50LOO    ANNULUS, QUAD NQ.
ACCUMULATORTANKCME42 0.75 W AIR                                                  2 OPERAlED OUTLET AND SAFElY WJECTION TO RC LOOP N2 COLO LEG TEST VALVE 24tV.176                    RESDVAL HEAT REMOVALI                                          ANtIULVS.QUAD NQ.
ACCVMV(ATORTANKOME4S 0.75 W HR                                                    3 OPERATED OUTLET AND SAFETY WJECTION TQ RC LOOP N3 COLO LEG TESf VALVE 24tV-186  0                RESDVAL HEAT REMOVALI                  CONTAWMENT    598.00  ANNULUS, QUAD NO.
ACCUMULATORTANK0M&54 1 W AIR                                                    4 OPERATED OUTLET ANO SAFElY WJECDON TO RC LOOP N4 COLD LEG TEST VALVE 12      24(V-260  0        SAFETY WJECTIQNI SAFEIY WJECTIQN                AUXIUARY    587.00    S SAFEIY INJ PMP TEST UNE SHUTOFF VALVE                                                  RM 24tV<1 0  0            RESOVAL HEAT REMOVALI EAST                  AtgOUARY    600.00    E RHR HEAT XCHGR RESDVAL HEAT REMOVALHEAT                                                  RM EXCHANGER HE.17E 8 W AIR OPERATED OUTlET FLOW CONTROL VALVE 12      24R V<11  0        RESDUAL HEAT REMOVALI RESDVAL                    AUXIUARY    609.00    E RHR HEAT XCHGR HEAT REMOVALHEAT EXCHANGERS                                                RM BYPASS FLOW 8 W AIR OPERAlEO                  I CONTROL VALVE                        I 2JRV420    0            RESDUAL HEAT REMOVAl.I WEST                  AUXNJARY    609.00    WRHRHEATXCHGR RESDUAL HEAT REMOVAL HEAT                                                RM EXCHANGER HE-1 7W 8 W AIR OPERATED OUTLET FLOW CotrlRQL VALVE 12      24(V40    0      BORON WJECTIQN I BCRQN WJECIlON TQ              CQNTAWMENT    598.00    ANNULUS, QUAD NQ.
ACCUMULATORFILL LWE CONTROL VALVE                                                2 12      24\Vie    0      SAFEIY INJECTION I SAFETY WJECTIQN TO            CQNTAWMENT    598.00    ANNULUS, QUAD NQ.
ACCUMULATOR FILL UNE CONTROL VALVE                                                2 24ICR-251  0      NUCLEAR SAMPUNG I SIEAM GENERATOR                  AUIOUARY    501.00        VESTIBVLE
                                      &#xb9;1 S(EAM SAMPLE MSX.101 CONTHNMENT ISmhllQN VALVE
 
1/8/96 12:46 PM                    DONALD C. COOK NUCLEAR PLANT UNIT 2                                        &#xb9;                                Page&#xb9;7 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW Equip      Train                              System  I Equipment Oescri phon                                Bueding  Ftoor Elev    Room or Row Col 7            1                0    NUCLEAR SAMPUNG I STEAM GENERATOR                                    AU)0UARY    591.00        VESllSULE
                                        &#xb9;2 STEAM SAMPLE MSX-102 CONTNHMENT ISO(ATIOH VALVE 0    NUCLEAR SAMPUNG I STEAM GENERATOR                                    AUXUARY    591.00        VESTIBULE
                                        &#xb9;3 STEAM SAMPLE MSX 103 CONTNNMENT ISOLAllOHVALVE 0    NUCLEARSAMPUNG I STEAM GENERATOR                                      AUXuARY    591.00        VESTIBULE
                                        &#xb9;4 STEAM SAMPLE MSX-1 04 CONTNHMENT ISOLATlQH VALVE 24JRV 151    0    NUCLEAR SAMPUNG I STEAM GENERATOR                                    CONTNHMENT  012.00      E CONT LOWER
                                            &#xb9;1 SIEAM SAMPLE MSX-101 SAMPLE                                                                VENT RM SHUTOFF VALVE 24lRV.1 52  0    NUCLEAR SAMPUNG I STEAM GENERATOR                                  CONTNHMENT    01200        W CONT LOWER
                                            &#xb9;2 STEAM SAMPLE MSX.1 02 SAMPLE                                                                VENT I(M SHUTOFF VALVE 244RV 153    0    NUCLEAR SAMPUNG I SIEAM GENERATOR                                    CONTNHMENT    01200        W CONT LOWER STEAM SAMPLE MSX-1 03 SAMPLE                                                                VENT RM SHUTOFF VALVE 24IRV.1 54        NUCLEAR SAMPUHG I STEAM GENERATOR                                    CONTAINMENT  01200        E CONT LOWER
                                          &#xb9;4 STEAM SAMPLE MSX-1 04 SAMPLE                                                                VENT RM SHUTOFF VALVE 244RV-211        MAINSTEAM I STEAM GENERATOR &#xb9;1 STOP                                    AUXNJARY    03200      E MNN STM STOP VALVEMRV-21 0 STEAM CYUNDER TRAtN                            'A'UMP ENCL VALVE a7                24ARV.21 2    0    MNN STEAM I STEAM GENERATOR &#xb9;1 STOP                                    AU)0UARY,  033.00      E MNN STM STOP VALVEMRV 21 0 STEAM CYUNDER TRNN '(7                                                                  ENCL DUMP VALVE 24IRV.221          MAINSTEAM I STEAM GENERATOR &#xb9;2 STOP                                    AUXLIARY  033.00        W MN STM STOP VALVEMRV.220 STEAM CYUNDER mNN                              'A'UMP ENCL VALVE 24rlRV~      0    MNN STEAM I STEAM GENERATOR &#xb9;2 STOP                                    AU)0UARY  03200        W MN STM STOP
                                    'ALVEMRV.220 STEAM CYUNDER TRAN 'P                                                                      ENCt.
DUMP VALVE 24lRV~t      0    MNN STEAM I STEAM GENERATOR &#xb9;3 STOP                                    AU)0UARY  033.00      W MN STM STOP VALVEMRV.230 STEAM CYUNOER TRNH'A'                                                                  ENCL DUMP VALVE 24%V.232    0    MNN STEAM I STEAM GENERATOR &#xb9;3 STOP                                    AUXLIARY  033.00      W MN STM STOP VALVEMRV-230 SlEAM CYUNDER TRAIN'(7                                                                  ENCL DUMP VALVE 244RV441          MNH STEAM I STEAM GENERATOR &#xb9;4 SlDP                                    AU)OUARY  03L00        E MNN STM STOP VALVEMRV440 STEAM CYUNDER TRAN                                                                        ENCL
                                                                          ~
                                                                                                  'A'UMP VALVE 244RV-242    0    MNN STEAM I STEAM GENERATOR &#xb9;4 STOP                                    AUXIUARY  03LOO        E MNN SiM STOP VALVEMRV-240 STEAM CYUNDER TRAIN 'E                                                                  ENCL DUMP VALVE 24RV 101          NUCLEAR SAMPUHG I REACTOR                                            CONTNNMENT  59(LOO    ANNULUS, QUAD NO.
LOOP &#xb9;1 HOT LEG SAMPLE NSX-101                                                                    1 SHUTOFF VALVE 12    24RV 102              NUCLEAR SAMPUNG I PRESSURRER                                    COHTNN MENT  012.00      IHSTRUM ENTATIQN
                                    ~ UQUIDSPACE SAMPLE NSX-1 02 SHUTOFF RM VALVE 24RV 103            NUCLEAR SAM) UNG I REACTOR          CQOLAHl'OOP CONTAINMENT  59IL00    ANNULUS, QUAD NO.
                                                  &#xb9;3 HOT LEG SAMPLE NSX-1 03                                                                  3 SHUTOFF VALVE 12  24(RV.104              NUCLEAR SAMPUNG I PRESSURRER                                    CONTNHMEHT    012.00      IHSlRUMENTATIQN STEAM SPACE SAMPLE NSX-1 04 SHUTOFF                                                                    RM VALVE 2+RV 151              PRESSURIZER I PRESSURIZER TRNN                                    CONTAINMENT  05(LOO    PRESSURRER ENCI REUEF VALVE              'B'RESSURE INTERIOR 24IRV-1 52  0    'RESSURIZER        I PRESSURIZERTRNN'Iy PRESSURE REUEF VALVE 24RV 153    0        PRESSURRER I PRESSURIZER OMER                                    CONTNHMENT  05(LOO    PRESSURtZER ENCL TRAIN'A'RESSURE REUEF VALVE                                                                    INTERIOR 12    24RV 10            REACTOR COOLANT PUMP SEAL WATER                                    CONTAINMENT  017.00    LOWER CONT, QUAD NJI(S(OFF I REACTOR COOLANT PUMP                                                                    NO. 1
                                      &#xb9;1 SEAL &#xb9;1 LEAKOFF TO RCP SEAL WATER RETURN FILTER QC 109 2 IN NR OPERATED SHUTOFF VALVE 24RV 111              LETDOWN (CVCS) I REACTOR COOLANT                                  CONTNHMENT  012.00    LOWER CONT, QUAD NORMALLETDOWN TRAN 'A'HUTOFF                                                                      NO. 4 VALVE 24RV 112    0        LETDOWN (CVCS) I REACTOR COOLANT                                  CONTAINMENT  012.00    LOWER CONT, QUAD NORMALLETDOWN TRNN 'E SHUTOFF                                                                      NO. 4 VALVE 24RV.113            LETDOWN (CVCS) I REACTOR COOLANT                                  CONTNHMENT  012.00    LOWER COHT, QUAD EXCESS LETDOWNTO EXCESS LETDONN                                                                      NO. 4 HEAT EXCHANGER HE 13 1 IH AIR OPERATED TRAIN 'O'HUTOFF VALVE                                                I 24RV 114    0      LETDOWN (CVCS) I REACTOR COOLANT                                  COHTNHMENT  01200      LOWER CONT, QUAD EXCESS LETDOWNTO EXCESS LETDOWN                                                                      NO. 4 HEAT EXCHANGER HE-1 3 1 IN AIR OPERATED TRAIN 'A'HUTOFF VALVE 12    24RV-1 50    0      REACTOR COOLANT PUMP SEAL WATER                                    CQNTNNMENT  598.00    ANNULUS. QUAD NO.
NJILEN(OFF I REACTOR COOLANT PUMPS                                                                      2 STARTUP SEAL SYSTEM SYPASS TO SEAL WATER RETURN FILTER QC.109 0.75 IH NR OPERATED SHIITOFF VALVE 12    24RV 170    0        LETDOWN (CVCS) I EXCESS LETDOWN                                  CONTNHMEHT  012,00    REGEN HEAT XCHGR HEATEXCHANGER HE 13 1 IH AIR                                                                    RM OPERATED OIIILETPRESSURE CONmQL VALVE
 
1/8/96 1246 PM                        DONALD C. COOK NUCLEAR PLANT UNIT 8 2                                              Page B8 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW Equipment K)                                                            Beesting FKor Bev      Room or Row Cd 24RV.171    0        LETDOWN (CVCS) I EXCESS LETDOWN            CONTANMENT    81200    REGEN HEATXCHGR HEAT EXCHANGER HE-1$ 1 N AIR                                            RM OPERATED OUTLET M/ERSON VALVE 7        12      24RV.20              REACTOR COOLANT PUMP SEAL WATER              CONTANMENT    025.00    LOWER CONT, QUAD NJ/LEAKOFF I REACTOR COOLANT PUMP 82 SEAL N LEAKOFF TO RCP SEAL WATER RETURN FILTER QC.1 09 2 N HR OPERATED SHUTOFF GLOBE VALVE 12      24RV 251    0        CHARGNQ (CVCS) I CVCS CEMTILIFVGAL            AUX8JARY    587.00      RECPRQCATNQ CHARGNQ PVMPS DISCHARGE FLOW S N                                        CHARQ PMP RM AIR OPERATED CONTROL GLOBE VALVE 12      24RV40                REACTOR COOLANT PUMP SEAL WATER                            812.00 -
LOWER CONT, QUAD NJ/LEAKOFF I REACTOR COOLANT PUMP                                            NO. 3
                                          &#xb9;3 SEAL Nl LEAKOFF TO RCP SEAL WATER RETLIRM F)LTER QC.1 09 2 N AIR OPERATED SHUTOFF GLOBE VALVE 12 r    24RVM                REACTOR COOLANT PUMP SEAL WATER              COMl'AINMEMT  812.00    LOWER CONT, QUAD NJ/LEAKOFF I REACTOR COOlANT PUMP 08 SEAL N LEAKOFFTO RCP SEAL WATER RETURN FLYER QC.1 09 2 N HR OPERATED SHUTOFF GLOBE VALVE 24RV~        0        BORON MAKEUP (CVCS) I SOUIH BORIC            AUOLIARY    SX(IO      VOL GIRL TANKE A(2D BLENDER OP.21 2 N HR OPERATED                                          HALLWAY TD CVCS CHARGING PUMPS SUCTeM SHUTOFF VALVE 12      24RVA2I      0        BORON MAKEUP (CVCS) I SOUIH BORIC            AV)0LIARY    587.00      BORIC ACO STQR A(XD FILTER TO CVCS CHARGNQ PUMPS                                          TANKAREA
                                        'ANO SOUTH BORG A(20 BLENDER 1 N AIR OPERATED FLOW CONTROL GLOBE VALVE 12      24RV~        0        BORON MAKEUP (CVCS) I SOUTH BORG              AUXIUARY    587AO        BORIC ACE) STOR A(XDSTORAGE TANKTK.12S 2 N HR                                          TANKAREA OPERATED NLEfFLOW CONTROL GLOBE VALVE 12      24RVM1      0        BORON MAKEUP (CVCS) I SOUTH BORIC              AUXRAARY    809.00      VQL CTRL TANKE ACID BLENDER QP-21 TO REACTOR                                          HALLWAY COOLANT LETDOWN VOI.UME CONTROL TANK SHUTOFF VALVE 2-VRV415    0      CONTROL ROOM AIR CONLXTIONNQ CHIU.              AUXIUARY    05tl00    CTRLRMAIRCON(XT WATER I COMTROL ROOM VENTILAT)OM                                              RM V)ET HV~T      CHILLWATER NLET/BYPASS VALVE 2-VRV425    0      COMIRQL ROOM AIR CONDttlONNQ CtoLL              AUIQLIARY  85(L00    CTRL RM AIR CONDIT WATER I CONTROL ROOM VENlllhTION                                              RM UNIT HV~2      CHILLWATER INLET/BYPASS VALVE 2.WRV 72MB      0            ESSEMRAL SERVICE WATER I AB              ALSQUARY    587.00      AB EMER DSL GEN EMERGENCY DIESEL SOUTH COMBVSllOM                                                RM HR AFTERCOOLER HERBS ESW NLET/BYPASS VALVE 2-WRV.703    0          ESSEMllAL SERVICE WATER I EAST                          591AO    E ESSNTL SERV WTR
                                      ~  ESSEMllAL SERVICE WATER PUMP PP-7E                                          PMP RM (XSCHARGE SlRAINER WEST BASKET BACKWASHOUTLET SHUfOFF VALVE 2-WRY.TIM    0          ESSENTIAL SERVICEWATERIWEST              SCREENHQUSE    591.00      W ESSNTL SERV ESSENTIAL SERVICE WATER PUMP PP.7W                                        WTR PMP RM (XSCHARGE STRANER WEST BASKET BACKWASH OUTLET SHUTOFF VALVE 2-WRV 788    0            ESSENTIAL SERVICE WATER I EAST          SCREENHQUSE    591.00    E ESSNTL SERV WTR ESSENllAL SERVCE WATER PUMP PP-7E                                            PMP RM (XSCHARGE STRAINER WEST BASKET BACKWASH INLETSHUTOFF VALVE 2-WRY.789    0          ESSENTIAL SERVICE WATER I WEST            SCREEN HOUSE  591.00      W ESSNTL SERV ESSENllAL SERVICE WATER PUMP PP.7W                                        WTR PMP RM (XSCHARGE STRHNER WEST NEET SHUTOFF VALVE BASKEl'ACKWASH 2-WRY.773    0            ESSENIIAL SERVICE WATER I EASf          SCREENHQUSE  591.00    E ESSMTL SERV WIR ESSENTIAL SERVCE WATER PUMP PP.7E                                            PMP RM (XSCHARGE STRAINER EAST BASKET BACKWASHOUTLET SHUTOFF VALVE 2.WRY.774                ESSENTIAL SERVCE WATER I WEST            SCREENHQUSE  591.00      W ESSMIL SERV ESSENllAL SERVICE WATER PUMP PP-TW                                        WTR PMP RM DISCHARGE STRANER EAST BASKET BACKWASHOUTLET SHUTOFF VALVE 2.WRV.778                ESSEMIIAL SERVICE WATER I EASf            SCREENHOUSE  591 AO    E ESSNTL SERV WTR ESSEMllAL SERVICE WATER PUMP PP-7E                                            PMP RM DLSCHARGE STRAINER EAST BASKET BACKWASH INLETSHUTOFF VALVE 2-WRY.779    0          ESSENltAL SERVCE WATER I WEST            SCREENHQUSE  591AO;      W ESSNTL SERV ESSENTIAL SERVICE WATER PUMP PP 7W                                        WTR PMP RM NSCHMGE STRANER EAST BASKET BACKWASH NLET SHUTOFF VALVE 24&V-220      0  'IESELSTARTNQHRIABEMERGENCY                        AVXIUARY DIESEL STARTNG HR JET ASSST COMIROL VALVE 20LRV-222              DIESEL STARTNG HR I AB EMERGENCY              AUXIUARY    587.00      ABEMERDSLGEN DIESEL REAR BANKSTARTING HR                                                RM SHUTOFF VALVE 2.XRV.225              DIESEL STARTNQ AIR I CO EMERGENCY              AVX8JARY    587AO      COEMERDSLGEN DESEL STARTNG AIR JET ASSST CONTROL                                              RM VALVE
 
1N$6 12:46 PM                DONALD C. COOK NUCLEAR PUQJT UNIT 2                      &#xb9;                            Page&#xb9;9 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW 24%V 220  0        DIESEL STARDNQ AJR I CD EMERGENCY                AVXQJARY    587.00 CDEMERDSLGEN DESEL FROW BANKSTARBNQ AIR                                                    RM SHUTOFF VALVE 2~V.227    0      TXESEL STARTINQ AIR I CD EMERGENCY                AVXQJARY    507.00 CDEMERDSLGEN TXESEL REAR BANKSTARTTNQ AQT                                                RM SHUTOFF VALVE 0        2  2CX34451        COMPONENT COOUNG WATER I RC PUMPS                    AVXRJARY    591.00      STARTVP BEARNQ OIL COOLERS CCW RETURN                                            SLOWDOWN HEADER TRAIN 'A'OWAQJMENT                                          FLASHTANKRM ISOLATIONVALVE 0    COMPONENT COOUNQ WATER I RC PUMPS                    AVXIUARY    591.00      STARTVP BEARQIQ CXL COOLERS CCW RElURN                                          SLOWDOWN HEADER TRAQJ R'OWJVNMEW                                            FLASHTANKRM ISOLATIONVALVE 0        COMPONEWCOmJNQ WATER I RCP                      AVXLIARY    591.00      STARTVP THERMALBARRIER COMPONENT COOUNG                                              SLOWDOWN WATER OUTLET TRNN 'A'ONTHNMENT                                            FLASHTANKRM ISOLATIONVALVE 0    COMPONENI COOUNQ WATER I RC PUMPS                    AVX0JARY    591.00      STARTVP THERMALBARRIER CCW RETURN HEADER                                            SLOWDOWN
                                'RAIN'8 CONTAINMENTISOLATION VALVE                                          FLASHTANKRM COMPONENT COOUNQ WATER I                      AUXLIARY    591.00        STARTUP COMPONENf COOUNQ WATER TO                                              SLOWDOWN REACTOR COOLANT PUMPS TRAN                                            FLASHTANKRM ISOLAllONVALVE    'A'ONTAINMENT COMPONENT COOUNG WATER I                                  591.00        STARTUP COMPONENT COOUNQ WATER TD                                              SLOWDOWN
                                  'EACTOR COOLANT PUMPS TRAIN'P                                            FLASHTANKRM COWAINMENTISOLATIONVALVE 2424O410  0        COMPONENT COQUNG WATER I EAST                    AVXNJARY    NQ.OO      MQ HALLWAY COMPONENT COOUNG WATER HEAT EXCHANGER HE-15E COMPONENT COOUNQ WATER OUTLET SHlflOFF VALVE 2C34O411                COMPONENT COOUNQ WATER I                      AVXNJARY    NQ.OO      MQ HALLWAY COMPONENT COOUNQ WATER PUMPS SVCllON CROSSTIE TRAN'A'HUTOFF VALVE 24J4Q412                COMPONENT COOUNG WATER I                      ALOOUARY    009.00    00Q HALLWAY COMPONENT COOUNQ WAlER PUMPS TXSCHARGE CROSSllE    TRAN'A'HUTOFF VALVE 24J4O413                COMPONENT COOUNQ WATER I                      AVXIUARY    NQ.OO      MQ HALLWAY COMPONENT COOUNQ WATER PUMPS SVCDON CROSSllE TRAN '8 SHUTOFF VALVE 24J4O414  0            COMPONENT COOUNQ WATER I                      ALUOUARY    00Q.OO    NQ HALLWAY COMPONENT COOUNQ WATER PUMPS QSCHARGE CROSSllE TRAQJ%'HUTOFF VALVE 2~15                    COMPONENT COOUNQ WAlER I COMPONENT COOUNQ WAlER TO AVJOLIARY    NQ.OO    MQ HALLWAY MISCELLANEOUS SERVICE TRAN VALVE    'A'HUTOFF 2~10      0      COMPONENT COOUNQ WATER I CCW TO                    AVXUARY      009.00    009 HALLWAY MISCELLANEOUS SERVICE HEADER 'Jf 10 In MOTOR OPERATED SH VlDFF VALVE 24J4Q419            COMPONENT COOUNG WATER I EAST                    AVXIUARY    MQ.OO    NQ HALLWAY RESDVAL HEAT REMOVALHEAT EXCHANGER HE.17E COMPONENf COOUNG WATER OUTLET SHUTOFF VALVE 0        COMPONENT COOUNG WATER I WEST                      AVIOUARY    009.00    00Q HALLWAY COMPONENT COOUNQ WATER HEAT EXCHANGER COMPONENT COOUNQ WATER OUTLET SHUTOFF VALVE 0    COMPONENT COOUNG WATER I WEST RHR                    AVXAJARY  ~
CQ.OO      033 HALLWAY HEAT EXCHANGER HE-17W CCW OUTLET SHUTOFF VALVE 2+MO-21 1  0    AVXIUARYFEEDWATER I TVRSQIE DRIVEN                    ALOOUARY    012.00  E MAINSTM STOP AVXQJARYFEED PUMP PPA TXSCHARGE                                                  ENCL TO STEAM GENERATOR OMM-1 4 In MOTOR OPERATED CONTROL VALVE 2+MO.212  0        AVXIUARYFEEDWATER I WEST MOTOR                    AVJOLIARY  01200    EMAQISTMSTOP DRIVEN AVIOLIARYFEEDWATER PUMP                                                  ENCL SUPPLY TO SlEAM GENERATOR OME4.1 4 In MOTOR OPERAlED CONTROL VALVE 2+MO.221  0    AVXIUARYFEEOWATERJTURENEDRIVEN                        hlBQJARY    591.00        STARTVP AVXIUARYFEED PUMP PPQ DISCHARGE                                            SLOWDOWN TO STEAM GENERATOR DMS-2 4 In                                          FLASHTANKRM MOTOR OPERAlED CONTROL VALVE 0        AVIOUARYFEEOWATER I EAST MOTOR                    AVIOUARY    591.00        STARIUP DRIVEN AVXIUARYFEEDWAlER PUMP PP-                                            SLOWDOWN 3E SUPPLY TO STEAM GENERATOR OME4-                                          FLASHTANKRM 2 4 In MOTOR OPERATED CONTROL VALVE 2+MO-231  0    AVXOJARYFEEDWATER I TVRSQIE DRIVEN                    AVXIJARY    591.00        Sl'ARTVP AVXIUARYFEED PUMP SUPPLY TO STEAM                                            BLOWDOWN GENERATOR OMEGA 4 In MOTOR                                            FLASHTANKRM OPERATED CONTROL VALVE AVXIUARYFEEDWATER I EAST MOTOR                    AVXXJARY    591.00        STARTVP
                            , DRIVEN    AVXIUARYFEEDWATER PV MP PP                                        SLOWDOWN 3E SUPPLY TO STEAM GENERATOR OMM-                                          FLASHfhNKRM 3 4 In MOTOR OPERATED CONTROL VALVE
 
1N/96 12:46 PM                      DONALD C. COOK NUCLEAR PLANT UNIT 2          &#xb9;                        Page&#xb9; 10 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW
)  ii/z 8
T
                'I    2+MD.241      0    AUXLIARYFEEDWATER I TVRSNE DRIVEN AUXLIARYFEED PUMP SUPP!.Y TO STEAM AUXIUARY  812.00  EMHNSTM STOP ENCL GENERATOR OME~ 4 In MOTOR OPERATED CONTROL VALVE 2+MD.242      0    ALOQUARYFEEDWATER I WEST MOTOR          AUXLIARY  812.00  E MANSTM STOP DRIVEN AUXIUARYFEEDWATER PUMP                                    ENCL SUPPLY TD STEAM GENERATOR OME~ 4 In MOTOR OPERATED CONTROL VALVE 24IV47OP~I      0          DESEL ROOM VEMIILATIONI AB        AVXLIARY  587.00  ABEMERDSLGEN EMERGENCY DESEL GENERATOR ROOM                                    RM VEMTLATIONEXHAUST FAN HV4XIX.Z TEMPERING AIR DAMPER 24CV4XJP~    ~  0          DESEL ROOM VEMTLATIQNI AS          AUXLIARY EMERGENCY DESEL GENERATOR ROOM iVENTLATTONSUPPLY FAN HVJXISZ TEMPERING AIR DAMPER 24IV4KP~1        0          DESEL ROOM VEMTLAllQNI CD          AUXLIARY  587.00  CD EMER DSL GEN EMERGENCY IXESEL GENERATOR ROOM                                    RM VENTLAllONEXHAUSfFAN HV47GX-1 TEMPERING AIR DAMPER 0          DESEL ROOM VENTLATIONI CD          AUXLIARY  587.00  CD EMER OSL GEN EMERGENCY DESEL GENERATOR ROOM                                      RM VEMTLATIONSUPPLY FAN HVJTGST TEMPER NG AIR DAMPER 24CVZKiSOhB      0          DESEL ROOM VENTLATIQNI AB          ANQUARY EMERGENCY DESEL GENERATOR ROOM VEMTLATlONSUPPLY FAN HV4XTSI OUTS DE AIR SHUTOFF DAMPER 2  24IV47GSDCD      0          DESEL ROOM VEMTILAllONI CD        AVXIUARY  598.00  RCTR CABLE TUNN, EMERGENCY IXESEL GENERATOR ROOM                                  QUAD 2 VENTLATKNSUPPLY FAN HVJXTS 2 QUTSDE AIR SHUTOFF DAMPER AUXLIARYBUILDNG VENlLATIONI 4KV RM        AUXIUARY  ON.00  4KV RM 800V SWGR 800 VOLT SWITCHGEAR XFORMERS TR21A                                  AREA a TR21C AREA VEMl'UPPLYFAN HV-SGRS8 SUCTION DAMPER 24CV~R4ID4              AUXILIARYBUILDNGVENTLATKNI4KV          AU%VARY    809.00 4KV RM 800V    SWGR'REA RooM eoov swITGHGEAR TRANsFoRMERs AREA VEHTLATIOMSUPPLY FAN HV~RS-7 SUCTION DAMPER 24IV~R4404      0  AUXLIARYBUILDNG VENTILhllONI 800VAC        AVXIUARY  813.00      4KV ROOM
                                                    ~
                    /                      MOTOR CONTROL CENTER MEZZANINE                              MEZZANNEAREA AREA VEMTLATIONSUPPLY FAN HV~RS-
                                /                      9 VENT DAMPER 12      24CM-111    0        RESOUAL HEAT REMOVALI RHR TO        COMANMENI    598.00 ANNULUS, QUAD NO.
REACTOR            LOOPS 82 a CL CCLD                              2 LEGS COMTANMEMfISCRATION VALVE 24CM-129    0      RESOVAL HEAT REMOVALI REACTOR        CONl'ANMENT  SRLOO  ANNULUS, QUAD NO.
COOLANT LOOP 82 HOT LEG TO RESDUAL                                    2 HEAT REMOVALPUMPS SUCllON z CQNTAINMENTISQIATIQNVALVE 0      BORON NJECTION I BORON NJECTIQN        ANQUARY    812.00  BORON    NJ TANK TANKTRAN 'A'UTLETCOMTANMEMT                                OUllET VLVRM ISOLATIONVALVE 24CM-251    0      BORON NJECBQNI BORONNJECllON            AUXLIARY            BORON NJ TANK TANKTRAN %'UTLETCONTAINMENT                                OUTLET VLVRM ISQIATIQNVALVE 0        SAFETY IMJECIIQN I NORTH SAFETY      AUXLIARY  587.00  N SAFEIY NJ PMP NJECTIQN PUMP PP.28H DSCHARGE                                    RM COMTANMEMTISQIATIONVALVE 0        SAF EiY NJECTIQH I SQUIH SAF EIY      AUXLIARY  587.00  S SAFElY NJ PMP NJ~iQN PUMP PP.28S DSCHARGE CQMTAIMMEMTISOLATION VALVE RESDUAL HEAT REMOVALI ~          AUXIUARY  591.00      VESRBULE REDRCLLATIONSUMP TO EAST RHRICTS PUMPS SUCTION CONTANMEMTISOLATION VALVE 0            RESDUAL HEAT REMOVAL I            ANQUARY  591.00      VESIIBULE REDRCLLATIONSUMP TO WEST'HIVCTS PUMPS SUCllON CONTAINMENTISCXATIQN VALVE 24CM011      0        RESOUAL HEAT REMOVAL I EAST        ,AUXIUARY  809.00  E I08T HEAT XCHGR RESDUAL HEAT REMOVALTO RC LOOPS N                                      RM AIX)$ 4 COLO LEGS CONTAINMENT ISOLATIONVALVE 24CM021      0
                                          ~i RESGVAL HEAT REMOVALI WEST RHR TO CCKLANTLOOPS II2 AND 83 COLO LEGS CONTAINMEMTISOLATION AVXIUARY AUXILIARY 809.00  W RHR HEATXCHGR RM VALVE                                              I 24MQ-128            RESOUAL HEAT REMOVALI REACTOR        COMTANMENT  817.00  LOWER CONT, QUAD COOCAMT LOOP NZ HOT LEG TO RESDUAL                                  NO. 2 HEAT REMOVALPUMPS SUCTION SHUTOFF VALVE 24MO-210                  CCCR'HN MENT SPRAY I EAST        AUXLIARY          E CONI'PRAY PMP CONfhNMEMTSPRAY PUMP PP4E 10 In                                    RM MOTOR CPERAlED DSCHARGE SHUTOFF VALVE 24MO 211                  CCMTANMENT SPRAY I EAST                      573.00  E CQMI'PRAY PMP COMfh984EMT SPRAY PUMP PP.OE 10 In                                  RM MOTOR CPEMTED DSCHARGE SHUTOFF VALVE
 
1/8/96 12:46 PM                DONALD C. COOK NUCLEAR PLANT UNIT 5 2                                        Pageos 11 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW jj  ayp 8
                .run 2  24AO.212  0          CONTAWMENTSPRAY I EAST BuAoeg AUXLJARY Boor EIev 573.00 Room or Row Col E CONT SPRAY PMP CONTAWMENTSPRAY PUMP PP4E 2 In MOTOR OPERATED IXSCHARGE TO CONTAWMEMfSPRAY ADOIVEEDUCTOR SHUTOFF VALVE 24AO 215  0  CONTAINMENTSPRAY I REFVELNG WATER              AVXLJARY    STLOO    ECONTSPRAYPMP STORAGE TANKTO EAST COHTAINMEMT                                          RM SPRAY PUMP PP4E SUCDON 12 In MOTOR OPERATED SHUTOFF VALVE CONTHNMEHTSPRAY I WEST                  ALOOUARY  573.00  W CONf SPRAY PMP COHfAINMENTSPRAY PUMP PP4W 10 In                                          RM MOTOR OPERAlED IXSCHARGE SHUTOFF VALVE COMTAWMEHTSPRAY I WESf                  AVXLIARY  573.00  W CONT SPRAY PMP CONTAWMENTSPRAY PUMP PP4W                                              RM DLSCHARGE SHUTOFF 10 in MOTOR OPERATED VALVE CONTHNMENTSPRAY I WEST                  AUXUARY    573.00  W CONT SPRAY PMP COMTAINMENI'PRAYPUMP PP4W                                              RM IXSCHARGE TO COMTANMEMTSPRAY ADDIVEEDUCTOR 2 In MOTOR OPERATED SHUTOFF VALVE 0  CONTAWMENTSPRAY I REFVEUNQ WATER                ANOUARY    57200    W CONT SPRAY PMP STORAGE TANKTO WESf CONfhWMENT                                            RM SPRAY PUMP PP4W SVCAON 12 In MOTOR OPERATED SHUTOFF VALVE BORON INJECTION I BORON NJECTIQH            AVXLJARY  012.00  BOROMNJ TANKRM TANK~      'A'LETSHUTOFF VALVE 24AO 250  0      BORON NJECIION I BORON NJECTIQN              AUXLJARY  412.00  BORQM NJ TANKRM TANKTRAIN'If INLETSHUTOFF VALVE 12  24AQ401  0      REFVELNQ WATER SfORAGE TANK                AVXLIARY  587.00    S SAFETY NJ PMP SUPPLY I REFVEUNQ WATER STORAGE                                          RM TANKTK43 SUPPLY TO SAFElY NJECllON PUMPS SHUTOFF VALVE 0      REFVEUNQ WATER STORAGE TANK                AVXLJARY  587.00    N SAFElY NJ PMP SUPPLY I SAFElY INJECTION PUMPS                                        RM REQRCTO REFUEUNG WATER STORAGE TANK11C43 1RHM 'A'HUTOFF VALVE 0        REFUELNG WATER STORAGE TANK                AUXIUARY  587.00    N SAFElY NJ PMP SUPPLY I SAFElY NJECTOM PUMPS                                          RM RECIRC TO REFVEUNQ WATER STORAGE TANKTIC43 TRAIN %'HUTOFF VALVE 24AQ470, 0      SAF EIY NJECBOM I SAFETY NJECllON PUMPS DISCHARGE CROSSTIE TRAN AUXIUARY  587.00    N SAFEIY NJ PMP RM VALVE        'A'HUTOFF 24AO475  0      SAFElY NJECllOM I SAFEIY NJECBQN              AUXLIARY  587.00    S SAFETY INJ PMP PUMPS DSCHARGE CROSSTIE TRAN                                              RM VALVE        'B'HUTOFF 24AO410  0        RESDVAL HEAT REMOVALI EAST                AVXIUARY  573.00  EASTRHR PUMP RM RESDVAL HEAT REMOVALPUMP PP45E SUCTCM SHUTOFF VALVE 2AMO412            RESDUAL HEAT REMOVALI EAST                AUXIUARY  000.00  ERHRHEATXCHGR.
RESDVAL HEAT REMOVALHEAT                                              RM EXCHANGER HE-17E OVILETMO4FLOW LINE SHUTOFF VALVE 24AO418  0        RESDUAL HEAT REMOVALI EAST                AUXIUARY  000.00  E RHR HEAT XCHQR RESDUAL HEAT REMOVALPUMP PP45E                                              RM IXSCHARGE CROSSllE SHUTOFF VALVE 24AO415  0  RESDUAL HEAT REMOVALI EAST RHR AND            CQMI'ANMENT  412.00      E CQHT LOWER NORTH SAFElY NJECllON TO REACTOR                                        VENT RM COOLANT LOOPS &#xb9;1 AND &#xb9;A HOT LEGS SHVfOFF VALVE 2AMO41 0  0  RESDUAL HEAT REMOVALI EAST RHR AND            CONTHNMENT  012.00      E CONT LOWER NORTH SAFElY NJECAON TO REACTOR                                          VENT RM COOLANT LOOPS &#xb9;1 AND &#xb9;A COLD LEGS SHUfQFF VALVE RESDUAL HEAT REMOVALI WEST                AVXIUARY    573.00    WRHRPMPRM RESDUAL HEAT REMOVALPUMP PP45W SUCTION SHUTOFF VALVE 0        RESDUAL HEAT REMOVALI WEST                AUXLJARY  00Q.OO    WRHRHEATXCHGR RESDUAL HEAT REMOVALHEAT                                              RM EXCHANGER HE.17W OUTLET MWW.OW UNE SHUTOFF VALVE 24AQ424  0        RESQUAL HEAT REMOVALI WEST                AVXIUARY  000.00    W RHR HEATXCHGR RESOVAL HEAT REMOVALPUMP PP45W                                              RM IXSCHARGE CROSSTIE SHUTOFF VALVE 0    RESQUAL HEAT REMOVALI WEST RHR              COHTHNMENT  01200      W CONT LOWER AND SOUTH SAFElY NJECTIOM TO                                          VENT RM REACTOR COOLANT LOOPS &#xb9;2 AND &#xb9;3 HOT                                              I LEGS SHUTOFF VALVE 0    RESOUAL HEAT REMOVALI WEST RHR              CQNTANMEMT  d12.00      W CONT LOWER AND SOVlH SAFEIY NJECIION TO                                          VENT RM REACTOR COOLANT LOOPS &#xb9;2 AND &#xb9;3 COLO LEGS SHUTOFF VALVE RESDVAL HEAT REMOVALI EAST                AUXIUARY  00Q.OO    E RHR HEATXCHGR RESDVAL HEAT REMOVALTO UPPER                                            RM CONTHNMENT SPRAY SHUTOFF VALVE 24AQ43'I      RESOVAL HEAT REMOVAL I WEST RHR TO              AVXLJARY  00Q.OO    WRHRHEATXCHGR UPPER CONTAWMEMTSPRAY SHUTOFF                                              RM VALVE
 
1/mg6 1248 PM                    DONALD C. COOK NUCLEAR PLANT UNIT 2        &#xb9;                                Page  &#xb9; 12 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR RELAY REVIEW .
EquIP    Tliirl                                                              Buk5ng  Floor Elev      Room or Row Cd 8        12                  0        RESDUAL HEAT REMOVAL EASTI        AUXUARY        800.00    E RHR HEAT XCHGR RESOUAL HEAT REMOVALHEAT                                            RM EXCHANGER TO CHARGNO PUMPS SUCDON SHUTOFF VALVE 12                  0                              I RESOUAL HEAT REMOVAL WESl'HR          AVXUARY        .800.00
                                                                                                    '    RHR HEAT XCHGR HEAT EXCHANGER OVTLEfTO SAFETY                                          RM NJECIIQN PUMP SUCAOM SHUTOFF VALVE 12                  0      SAFElY INJECTION I SAFElY INJECAON    AIJXLIARY      587.00      W CENTRIFUGAL PUMPS TO CVCS CHARGING PUMPS                                    CHARG PMP RM SUCDOM HEADER CROSSTIE SHUTOFF VALVE 0      SAFETY INJECllON I SAFElY IMJECDON    AUX8JARY      587.00      N SAFETY IMJ PMP PUMPS SUCllON TO ANO FROM CHARGING                                        RM PUMPS SUCllQN TRAIN 'A'HUTOFF VALVE 0    'AFETY ItLIECAONISAFETY NJECDQN        AUJ0UARY      587.00    N SAFETY INJ PMP PUMPS SUCDOM TQ AND FROM CHARGING                                          RM PUMPS SUCAON TRAIN'If SHUTOFF VALVE 12                  0    RESDVAL HEAT REMOVALI REFUEUNG        AUXNJARY      501.00        VESRBULE WATER STORAGE TANKTK43 TO RESOVAL HEAT REMOVALPUMPS SUCllON SHUTOFF                                              '
VALVE 24MQ51    0    BORON INJECTION I BORON INJECDON TQ REACTOR COOLANfLOOP &#xb9;1 SHUTOFF VALVE 0                        I BORON INJECRON BORON INJECIION TO REACTOR COOLANTLOOP &#xb9;2 SHUTOFF VALVE 0    BORON INJECllQM I BORON &#xb9;4JECRQN TO REACTOR COOLANfLOOP &#xb9;3 SHUTOFF VALVE 0    BORON II4JECllQM I BORON INJECTION TO  CONthNMENT      5QL00    ANNULUS, QUAD NO.
REACTOR COOLAMl'LOOP &#xb9;4 SHUTOFF                                          4 VALVE 24MQ01 0  0        REFUEUNG WATER STORAGE TANK          AUXLJARY      587.00      RECIPROCATING SUPPLY/ REFUEUMG WATER STORAGE                                    CHARG PMP RM TANKTO CVCS CHARG8IG PUMPS SUCDOM HEADER TRAN 'A'HUTOFF VALVE 24MQ011    0        REFVEUNG WATER StORAGE TANK        AUXLIARY      587.00      E CENTRIFUGAL SUPPLY I REFUEIJNG WATER STORAGE                                CHARG PMP ROOM TANKTO CVCS CHARGING PUMPS SUCTION
                                                      'tf HEADER TRAIN SHUTOFF VALVE ISO 240    0  IXESEL LUBE OL I AB EMERGENCY DIESEL    AVXQARY        587.00      ABEMERDS.GEN UPPER VALVEGEAR LIBRCATlON                                            RM CONTROL SOLENOID &#xb9;1 24$ 0.241  0  TXESEL LUBE QL/AB EMERGENCY DIESEL      AUXLIARY      587.00      AB EMER DSL GEN UPPER VALVEGEAR LVBRICATlOM                                          RM CONTROL SOLENOID &#xb9;2 0    IXESEL LUBE OIL I CD EAIER DIESEL GEN  AUXXIARY      587.00    COEMERDSLGEN UPPER VALVEGEAR LISRCATlOM                                            RM CONTROL SOLENOID    &#xb9;I 0    QEBEL LUBE crLIGD EMER DIEsEL GEN      AVXLIARY      587.00    CD EMER DSL GEN 0,        UPPER VALVEGEAR LUBRICAllON CONTROL SOLENOID &#xb9;2 MANSTEAM I Mh&#xb9;I STEAM LEAD &#xb9;2 TO AUXKJARYFEED PUMP TURBINE 4 IN MOTOR OPERATEO SHUTOFF VALVE AVXLJARY      833.00 RM W MN STM STOP ENCL 24tlCM 231  0      MNMSlEAM I MAINSTEAM LEAD &#xb9;3 TO        AUXUARY        033.00      W MN SlM STOP AVXIUAITYFEED PUMP TURBINE 4 0I                                      ENCL MOTOR OPERATED SHVtOFF VALVE 0  MAIMSTEAM I STEAM Sl'OP VALVEMRV-21 0    ALDQUARY      833.00      EMIVMSIMSTQP STEAM CYUNDER DUMP 4 IN MOTOR                                        ENCL OPERATED VALVESSELECI'OR VALVE 0  LWN STEAM I STEAM STOP VALVEMRV-220      AVX8JARY      833.00      W MN STM STOP SlEAM CYUNOER DUMP 4 IN MOTOR                                        ENCL OPERATED VALVESSELECTOR VALVE 0  MhN STEAM I STEAM SfOP VALVEMRV.230      AUXLIARY      83300        W MN SIM STOP STEAM CYUNDER DUMP VALVES4 N                                          ENCL MOTOR OPERATED SELECTOR VALVE MtuM STEAM I STEAM Sl'OP VALVEMRV-240    AUxXJARY      833.00      E Mhur sTM sTop STEAM CYUMOER DUMP VALVE4 IM MOTOR                                        ENCL OPERATED SELECTOR VALVE 2 JAIQ-I51 0      PRESSURIZER I PRESSUtuZER REUEF VALVENRV-1 51 UPSTREAM 3 IN MOTOR OPERATED SHUTOFF VALVE 0      PRESSURIZER I PRESSURIZER REUEF      CONTHNMEMT      89100    PRESSURIZER ENCL, VALVEMRV-152 UPSTREAM 3 IN MOTOR                                      NTERIOR QPERATEO SHUTOFF VALVE LIMO 153  0      PRESSURIZER I PRESSUtuZER REUEF VALVENRV.1 53 UPSTREAM 3 IN MOTOR OPERATEO SHUTOFF VALVE 2415Q81            REACTOR COOLANT SYSTEM VENTS I PRESSURIZER OMEN POSf ACCIDENT VENI'RA&#xb9;I'A'OLENOIDVALVE 0        REACTOR COOLANT SYSTEM VENTS I PRESSURIZER OMEQ POSTWCCIDENT vENT TRA&#xb9;r 'A'QLENoro YALYE 0      REACtOR COOVMT SYSTEM VENTS I        CONTANMENT      850.00    PRESSURIZER ENCL.
PRESSURIZER OMEQ POST-ACCIDENT                                        NTERIOR VENT TRA&#xb9;1 'If SOL&IQIO VALVE
 
1/mg6 1246 PM                      DONALD C. COOK NUCLEAR PLANT UNIT 2                              &#xb9;                            Page &#xb9; 13
                                                          ~
SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW
'3                                Rer No Bystem  I        Oeeoripoort REACTOR COOLANT SYSTEM VENTS                      I  CONTAWMENT Roar tace 05(L00 Room or Row Cot PRESSURIZER ENCL, PRESSURIZER OMEQ POST~DENT                                                          NTERIOR VENT'RAN'P SOLENOID VALVE REACfOR COOLANT PUMP SEALWATER                          COHTAINMENT    59IL00  ANNULUS, QVAD NO.
NJILEAKOFFIREACTOR COOLANT PUMP SEAL WATER RETURN ISOLATION 4 N MOTOR TRAN'A'OMTAWMENT OPERATEO VALVE 0      REACTCR COOLANT PUMP SEAL WATER                            AVIOUARY    591.00        VESTIBULE NJILEAKOFFI REACIDR COOLANT PUMP SEAL WATER RETURN TRAIN '(f COHTAWMEMTISOLATION4 N MOTOR OPERATEO VALVE CHARGWG (CVCSI I CVCS CHARGNQ TO                          AUXLIARY    587.00    RECPRQCATNQ
                                      < REGENERATIVE HEAT EXCHANGER TRAN                                                  CHARQ PMP RM
                                                    'A'HUTOFF VALVE 2        1    0      CHARGWQ (CVCSI I CVCS CHARGWG TO                          AVIOUARY    587JD      RE(XPROCATNQ REGEtIERATIVE HEAT EXCHANGER TRAIN                                                CHARQ PMP RM
                                                    'IT SHUTOFF VALVE 0      CHARGWG (CVCSI I WESI'ENTTLIFUQAL                          AVXLIARY    587.00  WEST CENTRIFUGAL CHARGING PUMP M%FLOW TO RCP SEAL                                                  CHARQ PMP ROOM WATER HEAT EXCHANGER HE-11 2 IN MOTOR OPERATED SHUTOFF VALVE CHARGWG (CVCS) I WEST CENTRIFUGAL                          AVXIUARY    587.00    W CENTI4IFUQAL CHARGWG PUMP MNLFLOWTO RCP SEAL                                                    CHARD PMP RM WATER HEAT EXCHANGER HE-11 2 N MOTOR OPERATED SHUTOFF VALVE 12                          BORON MAKEUP (CVCS) I EMERGENCY                          AUXNJARY    587.00    BORIC AGO STOR BORATUt4 TO CVCS CHARGNG PUMPS                                                      TANKAREA SUCDQI4 HEADER SHUTOFF VALVE 243MO451    0      LETDOWN (CVCSII REACTOR COOLANT                            AUXIUARY    009.00    VOL CTRL TANKE LEIDOWNVOLUMECONTROL TANKTK.10                                                        HALLWAY TO CVCS CHARGNQ PUMPS TRAIN 4 W MOfOR OPERATED VALVE          'A'HUTOFF 0      LETDOWN (CVCS) I REACTOR COOLANT                          AVXIUARY    009.00    VOLCTRLTANKE LEIDOWNVOLUMECONTROL TANKTK 10                                                          HALLWAY TO CVCS CHARGING PUMPS TRAIN              'ff SHUtOFF 4 W MOTOR OPERATED VALVE 12      2CIT400    0    MAWSTEAM I TVRBWE DRIVEN AVXFEED                              TURBWE    591.00      TB DRIVEN AUX PUMP PPX TRIP ANO THROTTLE VALVE                                                  ~ FOWTR PMP 2%AID-703    0        ESSEMllAL SERVICE WATER I EAST                        SCREENHQUSE  591.00  E ESSNTL SERV W(R ESSENIIAL SERVICE WATER PUMP PP 7E                                                      PMP RM (XSCHARG E SHUTOFF VALVE 2-WMO 704    0        ESSEMllAL SERVICE WATER I WEST                        SCREENHOUSE  591.00    W ESSHTL SERV ESSENTIAL SERVICE WATER PUMP PP.TW                                                    WlR PMP RM QLK34ARGE SHUTOFF VALVE 0          ESSENTIAL SERVICE WATER I WEST                          TURBWE    509.00    ESSNTl. SERV WIR ESSENTIAL SERVICE WATER SUPPLY                                                      RPE TVNN I%ADER CROSSITE TO Utaf 1 SHUIDFF VALVE 0          ESSENTIAL SERVICE WATER I EAST                          TURBINE    509.00    ESSNTL SERV WTR ESSEMIIALSERVICE WATER SUPPLY                                                      PIPE TUNN HEADER CROSSilE TO UNIT 1 SHUTOFF VALVE 24AIO 712    0          ESSENIIAL SERVICE WATER I EAST                          AUXIUARY    033.QI      033 HALLWAY CONTAWMENTSPRAY HEAT EXCHANGER f6.18E ESSENTIAL SERVICE WATER NLET SHUTOFF VALVE 2.WMQ.714    0          ESSENTIAL SERVICE WATER I EAST                          AUXIUARY    009.00      009 HALlWAY CONTAWMEMTSPRAY HEAT EXCHANGER HE-1 8E ESSENTIAL SERVICE WATER OUTLET SHUTOFF VALVE 2-WMO 710    0        ESSEIIIIALSERVICEWATERIWEST                              AVXIUARY                033 HALLWAY COHTAWMEMfSPRAY HEAT EXCHANGER ESSENTIAL SERVICE WATER NLET SHVfOFF VALVE 2.WMQ.718    0          ESSENTIAL SERVICE WATER I WEST                          AUXIUARY  009.00      009 HALLWAY COMfAWMENTSPRAY HEAT EXCHANGER ESSENITAL SERVICE WATER OUTLET SHUTOFF VALVE 2-WMO.722~    0          ESSENIIAL SERVICE WATER I WEST                          AU%VARY    587.00    2CO OSL RM N PIPE ESSEMliAL SERVICE WATER SUPPLY                                                        TUNNEL HEADERTO AB EMERGENCY OESEL HEAT EXCHANGERS SHUTOFF VALVE 0          ESSENTIAL SERVICE WATER I EAST                          AUXIUARY    587.00    2CO OSL RM N RPE ESSENTIAL SERVICE WATER SUPPLY                                                        1UNNEL HEADERTO AB EMERGENCY DIESEL HEAT EXCHANGERS SHUTOFF VALVE 0          ESSENTIAL SERVICE WATER I EAST                          AUX9JARY    587.00    2CD DSL RM N PIPE ESSENllAL SERVICE WATER SUPPlY                                                        TUNNEL HEADER TO CO EMERGENCY (XESEL HEAT EXCHANGERS SHUTOFF VALVE ESSENILAL SERVICE WATER I WEST                          AUXIUARY    587.00    2CO DSL RM N RPE ESSENTIAL SERVICE WATER SVPPLY                                                        TUNNEL kKADER TO CO EMERGENCY (XESEL HEAT EXCHANGERS SHUTOFF VALVE 2-WMO.732    0          ESSENIIAL SERVICE WATER I EAST                          AVXIUARY    009.00      009 HALLWAY COMPQttENT COOUNQ WATER HEAT EXCHANGER HE.15E ESSENTIAL SERVICE WATER INLET SHUTOFF VALVE
 
I J
 
1/8/96 12:46 PM                    DONALD C. COOK NUCLEAR PLANT UNIT <<2                                                Page <<14 SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
FOR RELAY REVIEW EcpAp      Tran                            Syetem I Eqvipment Deecnpoon                Srednp  Ftoor EIev    Room or Row Cot 2-WMQ.734  0        ESSENAAL SERVICE WATER I EAST                AUXLIARY    809.00        80Q HALLWAY COMPONENT COOUNG WATER HEAT 2-WMO 738  0 0
COMPONENT    ~
EXCIIAMGERHE-15E EBS EMIALSERVICE WATER OU1LET SHUTOFF VALVE ESSENAAL SERVICE WATER I WEST WATER HEAT EXCHANGER ESSENAAL SERVICE WATER WLET SHUTOFF VALVE ESSEMIAL SERVICE WATER I WEST AUXIUARY AVXIUARY 8QQ.QO 800.00 8N HALLWAY 809 HALlWAY COMPONENT COQUNG WATER HEAT EXCHANGER ESSEMAAL SERVCE WATER OUTlET SHUTOFF VALVE 2-WMO 744  0    AUXLIARYFEED WAlER SYSTEM I ESW TO                  TURSNE    501.00    W MTR DRIVEN AUX WEST MOTOR DRIV AUX FEED PUMP PP4W                                            FDWTR PMP SHUIOFF 4 W MOTOR OPERATED VALVE 12    2.WMO 753  0      AUXLIARYFEED WATER I ESW TO TURB                  TURBWE    501.00      TB DRIVEN AUX DRIVEN ANC FEED PUMP PPW SHUTOFF 8                                          FOWlR PMP W MOTOR OPERATED VALVE 2.WMQ.754  0    ESSENAAL SERVICE WATER I ESSENTIAL                TURSME    501.00      E MTR DRIV AUX SERVICE WATER TO EAST MOTOR DRIVEN                                          FEEDWIR PMP ANQUARYFEED PUMP PP4E 4 W MOTOR OPERATED SHUTOFF VALVE 12                0      CONTROL AIR I PRESSURtZER TRAW 17            COMTAWMENT    85000    PRESSURIZER ENCL, PRESSVRE REUEF VALVENRV-152                                              WTERIOR CONTROL SOLEMOtD 20CSQ407  0      COMIROL AIR I PRESSURIZER TRAN                CONTAINMENT  850.00    PRESSURIZER ENCL, REUEF VALVEMRV-1 53 'A'RESSURE WIEROR CONTROL SOLENOID 124IV~.1    0  SCREENHOUSE VEMILATIOMI UNff2 EAST              SCREENHOUSE    501.00  E ESSMIL SERV WTR ESSEMAAL SERVCE WATER PUMP ROOM                                                PMP RM SUPPLY VEMAthllOMFAN 124CVESWC    0  SCREENHQUSE VENALAAQNI Ulaf 2 EAST              SCREENHOUSE    501.00  E ESSML SERV WIR ESSENAAL SERVCE WATER PUMP ROOM                                                PMP RM SUPPlY VEMAthllQNFAN 124IV~C      0  SCREENHOUSE VENALATIQNI UNIT2 WEST              SCREENHOUSE    501.00    W ESSNTL SERV ESSEMIAL SERVICE WATER PUMP ROOM                                            WlR PMP RM SUPPLY VENALATIOMFAH 12+IV~A      0  SCREENIIOUSE VEMLATIQMI UNIT 2 WEST              SCREENHOUSE    501.00    WESSHTLSERV ESSEMAAL SERVICE WATER PUMP ROOM                                            WTR PMP RM SUPPLY VEMALATIQMFAH 24IV~1      0        AUXLIARYBVLOWG VEMALAIIOHI                  AUXIUARY    83300    NORM BLOWOOWN ANOUARYBULOWG VENAlhllON                                              FLASHTAIQCRM ENGWEERED SAFElY FEATURE EXHAUST UNIT 1 0        ANQUARYBUIUXNGVEMALATIONI                    AUXLIARY    833.00    NORM BLOWOQWN AUXLIARYBVUXNGVEMLAllOH                                              FLASHTAMICRM ENGINEERED SAFETY FEATURE EXHAUST 24IV~PAutE 1 UNIT ANQUARYBIIAJXNG VEMALAllONI TRAN
                                      'V BATlERYROOM EAST EXHAUST FAM AUXLIARY    833.00    NORM    BL~
FlASHTAMICR M 24tV~AWE-2        AUXLIARYBVILDWGVEMALATIQHI TRAN                  AUXIUARY    833,00    NORM SLOWDOWN
                                      'V BAlTERYROOM WEST EXHAUST FAN                                          FlASHTANIC RM
                                                                                                                ~
2+IV~441    0      TURBWE BULDWG VENALAAQHI EAST                    TVRBWE    591.00      E MTR DRIV AUX MOTOR DRIVEN ANQUARYFEEDWATER                                            FEEDWIR PMP PUMP ROOM EXHAUSf FAN 24IV~P4Q            TURSME BULDWG VENALATIONI EAST                  TURBWE    501.00      E MIR DRIV AUX MOTOR DRIVEN AUXIUARYFEEDWATER                                                      PMP PUMP ROOM SUPPLY FAM 24IV~TI    0    1URBWE BULDINGVEMALAAQNIlURBWE                      TURBWE    591.00      TB DRIVEN AUX DRIVEN ANQUAIIYFEED PUMP ROOM                                            FDWIR PMP NORTH EXHAUSfFAM 24IV~P-72        TURBWE BULDWG VEMALAAQNI TURSNE                    TURBINE    591.00      TB DRIVEN AUX DRIVEN AUXuARYFEED PUMP ROOM                                              FDWTR PMP SOUTH EXHAUST FAH 2+IV~4(1    0      1URSNE BVLDWGVENALAAONI WEST                      TURBINE    501.00    W MTR DRIVEN AVX MOTOR DRIVEN ALOQUARYFEED PUMP                                            FDWIR PMP ROOM EAST EXHAUST FAN 0      1URBWE BVLDWGVENALATIONIWEST                      TURBWE    591.00    TB 591 ELEV BASMM MOTOR DRIVEN ANQUARYFEED PUMP ROOM WEST EXHAUST FAM 24IV~1              HYDROGEN SOMMER I CONTAWMENf                CONTHNMENT    825 00      HV~1 FAN RM HYDROGEN SIMER VENAlA11QN FAN 01 2+IV~Q 2    0        HYDROGEN SKIMMERI COM'AINMENT                COHTAWMENT    825.00      HV~Q.2 FAN RM HYDROGEN SXIMIAERVEMALATIQHFAM <<2 24IV47GS.1  0          DIESEL ROOM VENAlATIQNI CO                  AVXIUARY    587.00    CDEMEROSLGEN EMERGENCY DIESEL GENERATOR ROOM                                                  RM VEMALAAQMSUPPLY FAM 0          DIESEL RQQM VENALATIQNI AB                  AUXLIARY    587.00    ABEMERDSLGEN EMERGENCY OtESEL GENERATOR ROOM                                                  RM VEMILA11OMSUPPLY FAN 0          DIESEL ROOM VEMALAAQHI AB                  AUXLIARY    587.00    AB EMER OSL GEN EMERGENCY DtESEL GENERATOR ROOM                                                  RM CABWET VEMLATIQHSUPPLY FAN 0          DIESEL ROOM VEMALATIQNI CO                  AVXIUARY    587.00    CDEMERDSLGEN EMERGENCY DIESEL GENERATOR ROOM                                                  RM CABINEI'ENALATlQHSUPPLY FAN 24IV47GX.1              DIESEL ROOM VEMALATIQNI CO                  AUXIUARY              CO EMER DSL GEN EMERGENCY OtESEL GENERATOR ROOIA                                                  RM VEMALATlQHEXHAUST FAM
 
1/886 12:48 PM                        DONALD C. COOK NUCLEAR PLANT UNIT <<2                                      Page  <<15 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW Equip      Train                                                                  Buikling Boor Eiev    Room or Row Cd 0        1                      0          DESEL ROOM VENAIAAONI AB          AVXIUARY    557.00    AB EMER DSL GEN EMERGENCY DESEL GENERATOR ROOM                                        RM VEMllthAQNEXHAUST FAN 24fY~RS      1A            AVXNJARYBUuXNG VENALAAON        I    AUXNJARY    000.00  4KV RM NOV SWGR CONTROL ROD DRIVE EQIAPMENT ROOM                                    AREA ANO OIVERTER AREA VENALATIONNORTH SUPPLY FAN 24IV~RS 2        0      AUXLIARYBUuXNG VENALATION/4KV          AUXIUARY  N0.00      4KV RM AB 4KV ROOM AB 4KV SWITCHGEAR AREA                                  SWGR AREA VENALhllONSUPPI.Y FAM ANQUARYBVuXNG VENALATION 4KV    I      AVXIUARY  000.00      4KV RM CO 4KV ROOM CD 4KV SWITCHGEAR AREA                                  SWGR AREA VEMTllhTlQMSUPPLY FAN 0        AUXLJARYBVNJXNG VEMALhllON      I    AVXNJARY  N0.00    4KV RM NOV SWGR CONTROL ROO DRIVE EQUIPMENT ROOM                                    AREA AND INVERTER AREA VENALAllONSOUTH SUPPLY FAN 24IV~RS 7        0    AVXIUARYBVNJXNG VENALA1lQMI 4KV        AUXIUARY    000.00  4KV RM NOV SWGR ROOM 000 VOLT SWITCHGEAR                                      AREA TR/UISFQRMERS TRZI 8 AND TR21 D AREA VENAIATIQMSUPPLY FAN 24/V~RS0              ALOQUARYBUNJXNG VENALATION/4KV        AUXIUARY    NQ.QO    4KV RM 00OV SWGR ROOM NO VOLT SWITCHG EAR                                      AREA TIIANSFORMERS TR21 A ANO TR21 C AREA VEMALhllQNSUPPLY FAN 0        1                      0    AUXLIARYBIALDNGVENTllhTIONI OOQVAC      AUXNJARY    013.00        4KV ROOM MOTOR CONTROL CENTER MEZZAMNE                                MEZZAMQIEAREA AREA VEMALATlOMSVPPLY FAN 2+IVIX.2          0      AUXLLAf&#xc3;BUNJXNG VEMALhllONI 4KV        AUXIUARY    000.00      4KV RM AB 4KV ROOM AB 4KV SWITCHGEAR AREA                                  SWGR AREA VEMlllhTCMEXHAUST FAN 0      AIOQUARYBUNJXNG VENTILATIONI 4KV      AUXIUARY    N0.00      4KV RM CO 4KV ROOM CD 4KV SWITCHGEAR AREA                                  SWOR AREA
                                                ~ VEMALATIQNEXHAUST FAM 0      AVXNJARYBUDDING VENALATIONI AB        AUXIUARY    000.00    AB BATTERY EQUIP BATTERY EQUPMENT AREA BATTERY                                      AREA ROOM VEMTLATlONEXHAUSI'AM 24IV4GRX4I        0      UNQUhfIYBUlLJXNG VENALhllONI CO        AUXIUARY    02CN      CO BATTERY EQVIP BATTERYEQQPMENT AREA BATTERY                                      AREA ROOM VEMALATlOMEXHAUST FAM 2+IV~1            0    CONTROL ROOM VEMALATIQNI CONTROL        AVXIUARY    050.00  CTRL RM AIR CONDIT ROOM VENIXATIONNORTH AIR                                          RM CONDTlONIMG UNIT 10              2+IV~2                  CONTROL ROOM VENALhllONI CONTROL        AUXNJARY    050.00  ClRL RM AIR CONDIT ROOM VEMALAAONSOUTH AIR                                          RM CQNOAlQNING UNIT 24IV4CR  1      0    CONTROL ROOM AIR CONOIAQNNIG CHILL      AUXIUARY    0$ LQO  CTRL RM AIR CONDIT WATER I CONTROL ROOM AIR                                        RM CONOAlONING NORTH UQUIO CHILLER 2+INCR.2        0    CQNIRQL ROOM AIR CONOfAONING CHNJ.      AUXNJARY  CKLOO    CIRL RM AIR CONDIf WATER I CONTROL ROOM AIR                                        RM CCNOAlOINNG SOUTH UQUID CHIU.ER 15                24LATT~        0    250VDC DSAIIBVAONI PLANT BATTERY AB      AVXIUARY,, N0.00      AB BATTERY EQIAP 15              -
24ATT4Xl      0    25OVDC DSTRIBVAONI PLATT BATTERYCO        AUXIUARY  020.00    CO BATTERY EQUIP AREA 15        12                    0    25QVDC CONTROL ANQ INSTRUMENTATIQNI
                                                        'lf TRANI PLANT BATTERY AVXIUARY  CLLOO BL~
NORMAL FlhSHTANK ROOM 10        12                    0    250YDC CONTROL AMD INSTRUMENTATIQNI      AVXIUARY  CLLQO        033 HALLWAY BATTERYCHARGER A FOR N-TRANI BATTERY 10                  24QABS              250VOC DSlRIBVAQNI PLANT BATTERY        AUXIUARY  013.00        4KV ROOM BATT%8 BATTERY CHARGER NI        /                      MEZZANINEAREA 10                  24Ch82      '0      250VDC DSTRIBVAONI PLANl'ATTERY        AUXIUARY  013.00        4KV ROOM BATT%8 CHARGER 02                                MEZZANINEAREA 10        12                    0  250VDC CONTROL AND INSTRUMENTATIONI        AVXUARY    033.00        033 HALLWAY BAlTERYCHARGER 8 FOR N-TRAOI BATTERY 24C4231              250VDC DSTRIBVAONI PLANT BATTERY      AVXIUARY    CXLQO    CD BATTERY EQUIP BATT4XICHARGER NI                                        AREA 10                                      250VDC DSTRIBUTIQN I PLANT BATTERY    AUXIUARY    02500    CD BATTERY EQUIP BATT4X3 CHARGER 02                                        AREA 10                                0                120VAC CONTROL ROOM          AVXNJARY    NO.QO      NIVERTER AREA 5ISlRUMENTAAQMDSTRIBVAON SYSTEM I 12QVAC CONTROL ROOM INSTRUMEMf DSAOBVAONSYSTEM CHANNELI NIYERTER 15                                0    120V CQNfRQL ROOM INSTRUMENThAON        AUXIUARY    009.00      NIVERTER AREA DSIR I 120VAC CONTROL ROOM INSTRUMENT DSTRIBUTIQN SYSTEM CHANNEL N IVERTER 0    12QV CONTROL ROOM INSTRUMEMTATIQN      AUXIUARY    N0.00      INVERTER AREA DSTR /120VAC COMTROI. ROOM NISIRUMEMTATlONDSTRIBVAQN SYSTEM CHANNEL IN INVERTER 10                                0    12QV CONTROL ROOM INSTRUMENTATIQN      AUXIUARY    000.00      CONTROL ROOM DSTR I 120VAC CONTROL ROOM NIS IRVMENTDSTRIBVDON SYSTEM CHANNEL IV IMVERTER
 
1/6$ 6 12:46 PM                    DONALD C. COOK NUCLEAR PLANT UNIT 2                &#xb9;                              Page &#xb9; 16 SAFE SHUTDOWN EQUIPMENT UST (SSEL)
FOR RELAY REVIEW I)  Blue le T~
1      ASWV    0            QESEL GENERATOR, CONTROL 4              AVXIUARY      587.00  AB EMER OSL GEN WSTRVMENTABQMIAB EMERGENCY                                                  RM QESEL GENERATOR OME.1 5GAB WVERTER 0            QESEL GENERATlQM, CONTROL 4              AUXIUARY      587.00  CO EMER OSL GEN INSIRVMENfATKWI CD EMERGENCY                                                RM QESEL GENERATOR OME.1 5GCD 17          24NNE-I 5GAB  0            QESEL GEMERABOM. COHTROL 4              AUXIUARY  587.00      AB EMER DSL GEN I
IMSTRUMENTABQN AB EMERGENCY DIESEL GENERATOR 17          24XTIE-1 50CD  0            DESEL GENERATION. CONTROL 4              AUXIUARY      587.00  CD EMER DSL GEN INSTRUMBITAllONI CD EMERGENCY                                                RM QESEL GENERATOR 18              2CU 113    0        COHOENSAlE STORAGE TANKSUPPLY I              AUXKIARY      5OL00  STORAGE TANKPIPE CONDENSATE STORAGE TANKTKT32 LEVEL                                            TUNNEL WQCATOR TRANSMITTER 18              2423 114            CONDENSATE STORAGE TANKSUPPLY I              htDQUARY      SINL00  STORAGE TANKPIPE
                                      , CONDENSATE STORAGE TANKTK42 LEVEL                                            TUNNEL WQCATOR TRANSMITTER 18              2~21 0      0          AUXNIARYFEEDWATER I AUXLIARY              AVXIUARY      82400    E MAWSTM STOP FEEDWATER TO STEAM GENERATOR OME                                                END.
3 1 FLOW WQCATOR mAHSMITTER 18                                      AUXLIARYFEEDWATER I AUXNIARY              AUXNIARY      821.00    W MN STM STOP FEEDWAlER TO SiEAM GENERATOR OME-                                              ENCL
                                              $ 2 FlOW INOCATOR TRANSMITTER 18                                      AUXNIARYFEEDWATER I AVXLIARY              AVXIUARY      821.00    W MN STM STOP
                                        'EEDWATER TO STEAM GENERATOR OME                                                ENCL 33 FLOW WQCATQR TItANSMITTER
      '18                          0      FEEDWATER I ALDQUARYFEEOWATER TO              AUXIUARY      821.00    EMAINSTMSB3P STEAM GENERATOR OME~ FLOW                                                ENCL IMDCATORTftANSMfiTER 18              2-WDS.703    0          ESSEMBAL SERVICE WATER I              SCIIEENHOUSE    501.00  EESSNlLSERVWlR SERVICE WATER PUMP PP.TE EASl'SSENBAL PMP RM QSCHAItGE STRAWER OME44E 10GH QFFEREWlAL PRESSURE SWITCH 18                            0 ~        ESSENBAL SERVICE WATER I WEST          SCREENHQVSE      501.00    W ESSMTL SERV ESSBAlAL SERVICE WATER PUMP PP.TW                                        WTR PMP RM QSCHARGE SIRAWER OME44W HIGH QFFERENTIAL PRESSURE SWITCH 0          ESSEMBALSERVICEWATERIEASf                lURBWE        589.00  ESSNlL SERV WTR ESSENTlAL SERVICE WAlER SVPPLY                                          PIPE TUNN HEADER PRESSURE SWITCH 18              2-WPS 708    0          ESSENBAL SERVICE WATER I WEST              TURBWE        580.00  ESSMIL SERV WTR ESSEMBAL SERVICE WAlER SUPPLY                                            APE TURN HEADER PRESSURE SWITCH 0        TURBWE BINLDNGVENBLAllQNI EAST                TURBINE      501.00    E MTR DRIV AUX MOTOR DRIVEN AVXNIARYFEEDWAlER                                        FEEDWTR PMP PUMP ROOM EXHAUST FAN    HV~AII 10              2-VT$203    0      TURBWE BUNDWG VENBLABQNI TURBWE                1URBINE      501.00      TB DRIVEN AUX DRIVEN AVXLIAITYFEED PUMP ROOM                                          FOWIR PMP NORTH EXHAUST FAN HV~.T1 10                          0      TURBNIE BVNQNG VEMBLATIONI TURBWE              TURBINE      501.00  TBDRIVEN AUX DRIVEN AUXUARYFEED PUMP ROOM SOUTH EXHAUST FAN  HV~        T2 10              2.VTS.208  0        TURBINE BVILDNGVENBIATIQNI WEST              lURBINE      591.00  W MTR DRIVEN AVX T          MOTOR DRIVEN AIDQUARYFEEDWATER                                            FDWTR PMP PUMP ROOM WEST EXHAUST FAN HVAFP X2 10                                        DESEL ROOM VENBLABQMI AB                GROUNDS                REFUEL WTR STOR EMERGENCY DESEL GENERATOR ROOM                                            TANKAREA VENTNATlQMSUPPLY FAN HV43GS.2 OUTSIDE AIR THERMQSfAT Z.VTS341    0            DESEL RQQM YENBLATIQMI AB              AUXIUARY      587.00    ABEMERDSLGEN EMERGENCY QESEL GENERATOR ROOM                                                  RM VENBIABOMFANS        HV~.2  THERMOSTAT 0            QESEL RQQM VENBIATlQNI CD              AUXIUARY      598.00  RCTR CABLE TUNN, EMERGENCY DIESEL GENERATOR ROOM                                              QUADS VENBthllONSUPPLY FAN HVCKiS.1 OUTSIDE AIR THERMOSTAT 10                            0            QESEL RQQM VEMBtATlQNI CD              AUXIUARY      587.00    CO EMER DSL GEM EMERGENCY DESEL GENERATOR ROOM                                                  RM VEMBLATIONEXHAUST FAN HV4XIX1 THERMOSTAT 10          12                            AUXNIARYBINLDMGVEMTNATlONI                AUXIUARY      809.00    WVERTER AREA CONTROL ROO DRIVE EOINP ROOM ANO WV AREA VBffNORTH SUPPLY FAM HV-SGRS.1 A TEMPERAlURE SWITCH 12  2.VTS851                AUXNIARYBUILDWG VENBthTlQMI              AUXIUARY      80k00      CRD EQINP RM CONTROL ROO DRIVE EOINP ROOM AHD WV AREA VENT NORTH SUPPLY FAN HV.
SGRS 1A TEMPERATURE SWITCH 12                0      AUXNIARYBUILDNGVEMBLABONI 4KV                AVXIUARY      809.00  4KV RM 800V SWGR ROOM 800 VOLT SWITCHGEAR XFRMS                                              AREA TR21 B AHD TR21 0 AREA VENT SUPPLY FAN HV~S      7 TEMPERATURE SWffCH 10                            0    AVXNIARYBUNDNG VEMBLATlQMI 800VAC                AUXIUARY      81 3.00        4KV ROOM ~
MOTCR CONTROL CENTER MEZZAHWE                                        MEZZANWEAREA AREA VENT SUPPLY FAN  HV~S9 TEMPERAlURE SWIICH
 
1/886 12:46 PM              DONALD C. COOK NUCLEAR PlANT UNIT 2        &#xb9;                            Page&#xb9;  17 SAFE SHUTDOWN EQUIP MENT LIST (SSEL)
FOR RELAY REVIEW Equip      Train                    SferemI EqipmenC Oeecrlpdon      Budding  Boor EIev    Room or Row Col 10        12            0    AU%VARYBUuXNQ VENTXATIONI CTRL        AIQQUARY    000.00      NVERTER AREA ROO ORV EOQP ROOM AND NV AREA VENf OUfSDE IQR NLET DAMPER HV~R4l0.2 TEMPERATURE SWITCH 12            0    AUXLIARYBUuXNQ VENTIIATIONI CTRL      AUXRJARY    009.00      NVERTER AREA ROO DRIVE EOQP ROOM ANO NV AREA VENT RECRC NR NLET DAMPER HV4CR-MO.1 TEMPERATURE SWITCH 12            0    AUXIUARYBUuXNQ VENTILATlONI CRD      AtuQUARY    009.00      NVERTER AREA EOUgrMENT ROOM AND NVERTER AREA YEN%ATIONNORTH SUPPLY FAN HV.
SGRS4A TEMP SWITCH 10        12  2-VfSQ57 0    AIDQUARYBUuXNG VENTXATIONI CTRL      AUXLIARY    500.00      CRD EQUIP RM ROO DRIVE EQUIP ROOM ANO NV AREA VEMITATXNSOUTH SUPPLY FAN HV SGRS4A TEMPERATURE SWITCH 10                      0  SCREENHOUSE VEMBLhTIONI UNIT2 EAST    SCREENHOUSE  501.00    E ESSMIL SERV WTR
                            ~  ESW PUMP ROOM TEMPERATURE SWITCH                                  PMP RM 10                      0  SCREENHOUSEVEMIXATIONIUNff2 WEST          U92      501.00      W ESSNTL SERV ESW PUMP ROOM TEMPERATURE SW/fCH    SCREENHOUSE                WTR PMP RM 0    A%QUART BUuXNQ VEMBIATION/4$          AUXLIAI$    509.00      4$ RM    AB 4$
ROOM AB  4$  SWITCHGEAR AREA                ~              SWGR AREA VENTWAllONSUPPLY FAN HV~RS2 lHERMALSENSOR 10                      0    AUXIUAIIYBIAUXNQVEMIXATIONI      4$  AUXLIARY    009.00      4$ RM CD4$
ROOM CO  4$  SWITCHGEAR AREA                                SWOR AREA VENTLATIONSUPPLY FAN HV~RSS THERMALSENSOR 0    AUXXIARYBUuXNQ VENTIIATIONI 4KV      AUXXIARY    013 00        4$ ROOM ROOM OOOV SWOR XFMRS TR21 8 ANO                              MEZZANNEAREA TR21 DARER VENT SUPPLY FAN HV~S.T TEMP SWITCH1HERMALSENSOR 0    AUXUARYBULONG VEMILATlON/4$          AUIQUARY    509.00    dKV RM 50OV SWGR ROOM OOOV SWOR XFMRS TRZIA ANO                                    AREA lR2!C AREA VEMfSUPPLY FAN      HV~SS TEMP SWITCH TEMP SWITCH
 
  ~ ~
 
APPENDIX 8 DONALD C. COOK NUCLEAR PLANT FLOOR RESPONSE SPECTRA AS PER SQUG-GIP CRITERIA
 
Donald C. Cook Nuclear Plant DBE Ground Response Elevation 608 feet 2% and 5% Damping 0.50 0.40 C
0 0.30 O
O 0.20 CL M
0.10 0.00 0.1                                10 Frequency (hz)
Figure B-1 B-2
 
Donald C. Cook Nuclear Plant Auxiliary Building Elevation 587 feet 2% and 5% Damping 1.50 C) o  1.00 CJ 1
Ql                                      '
                                  ~ ~ ~ ~
O V
c5 0.50 (D
Cl.
(0 0.00 0.1                                  10 Frequency (hz)
Figure B-2 B-3
 
Donald C. Cook Nuclear Plant Auxiliary Building Elevation 633 feet 2% and 5% Damping 1.50
                                        ~  I 8 8 ~
Ol            ~    t ~    ~
o    100 t5 II O
O C
o  0.50 ED
                          ~
CL                    ~
(0                                  \              0
(~ ~ i
                    ~
i:'i
                      ~
0.00 0,1                                          10 Frequency (hz)
Figure B-3 B-4
 
Donald C. Cook Nuclear Plant Auxiliary Building Elevation 650 feet 2% and 5% Damping 1.50 O) 1.00 c5 O
O r  ~ ~ 8 ~ ~
C$
I CL 0.50 V) 0.00 0.1                                    10 Frequency (hz)
Figure B-4 B-5
 
Donald C. Cook Nuclear Plant Diesel Generator Bldg Elevation 609 feet 2'/o and 5% Damping 1.50 O) 1.00 C
l 0
0 C5 I
CL 0.50 (0
0.00 0.1                                  10 Frequency (hz)
Figure 8-5 8-6
 
Donald C. Cook Nuclear Plant Turbine Building Elevation 591 feet 2% and 5% Damping 1.50 1.00 C5 l
O 0
C 0.50 (0
                ~    I r  z  ~    ~ l 0.00 0.1                                      10 Frequency (hz)
Figure B-6 B-7
 
Donald C. Cook Nuclear Plant Containment Bailding Elevation 597 feet 2% and 5% Damping 1.50 Q) 1.00 (5
I O
O O
C$
0.50 CL 03 0.00 0.1                                  10 Frequency (hz)
Figure B-7 B-8
 
Donald C. Cook Nuclear Plant Containment Building Elevation 612 feet 2% and 5% Damping 2.00 1.50 C
O u
O 1.00 r ~ ~ ~ w  w ~  ~ a ~ ~a 0.50 0.00 0.1                                            10 Frequency (hz)
Figure B-8 B-9
 
Donald C. Cook Nuclear Plant Containment Building Elevation 625 feet 2% and 5'Yo Damping 2.00 J  ~  I~ 4~I i ")"!":"t  >
1.50 C
i" ! "i":")  >
O C
1 1.00 O
to 0.50 0.00 0.1                                    10 Frequency (hz)
Figure B-9 B-10
 
Donald C. Cook Nuclear Plant Containment Building Elevation 651 feet 2% and 5% Damping 3.00
                ~ ~ J ~            ~  ~ % 8 \
2.50 2.00 C$
I 1.50 O
C$
1.00 CD 0.50 0.00 0.1                                    10 Frequency (hz)
Figure B-10
 
Donald C. Cook Nuclear Plant Containment Building Elevation 663 feet 2% and 5% Damping 3.00
                          ~ ~
2.50 2.00 C
l r    i.  ~  ~,s, ~,  ~
1.50 O
                '''r'0 C
1.00            '
                        ~
CL M
                    ~
1  l:8 1
                                  ~
                                    ~
0.50
            ~ ~
0.00 0.1 Frequency (hz)
Figure B-11 B-12
 
Donald C. Cook Nuclear Plant Containment Building Elevation 675 feet 2% and 5% Damping 3.50 3.00 C
2.50 0
C 2.00 0
0 1.50 c5 1.00 (0
0.50 0.00 0.1                                  10 Frequency (hz)
Fibre B-12 B-13
 
Donald C. Cook Nuclear Plant Containment Building Elevation 687 feet 2% and 5% Damping 3.50 3.00 2.50 O
2.00 O
O 1.50 at
                    ~ ~
1.00 CO 0.50 0.00 0.1                                  10 Frequency (hz)
Figure B-13 B-14
 
~o O
C O
lC$tD c5 I
O 3
2 1
Donald C. Cook Nuclear Plant Containment Building Elevation 699 feet
              ~
                'le
                    ~
:~ '
                          ~  ~
2% and 5% Damping
                          ~  ~
                                        '." ~ ~ ~ I""}~ ~ ': ~ .' 5": ~
0 0.1                                                          10 Frequency (hz)
Figure B-14 B-15
 
Donald C. Cook Nuclear Plant Containment Building Elevation 711 feet 2% and 5% Damping i "i"i":"i i
  ~ i ~ ~ . ':.i i
                ~
i ~ ~ "i r  ii          i ~ ~ I~ ~  } ~ ~ .' ': ~ i ~ .. '. ~ ~ ~
10 Frequency (hz)
Figure B-15 B-16
 
Donald C. Cook Nuclear Fiant Containment Building Elevation 714 feet 2% and        5'amping C~ ~~
                  ~ I~  )
o) 3 C
O td l
tD 0  2 0
c5 V              ~  ~  r ~  ~
(Q  1
          ~    ~  ~  r ~  ~
0 0.1                                              10 Frequency (hz)
Figure B-16'-17
 
APPENDIX C DONALD C. COOK NUCLEAR PLANT - UNIT 2 SCREENING VERIFICATION DATA SHEETS (SVDS)
(AS PER SQUG GENERIC IMPLEMENTATION PROCEDURE, SECTION 4)
 
      .I
~ + ~
I
          't
 
Walkdown:      I/L        f 10/25/93                                                            DC CO          /IT 2                                                                                  Page    1 of 1 SCREENING VERIFICATION DATA SHEET (SVDS) item    Eq. Cl    Equp.lo    Rev      System/Equipmant Dascnph/m              Fker              Room or Row/Gohstln            Base                  Cspscsy vs.              Clip a C avesta Anchor haeract  Equip No.      No                                                Elev.                                            Eiev.                Demand Basta            Demand?    OK?    OK'?  OK?      OK?
1      0      124tE-I96    0  BORON RECOVERY LGVCS I SOUTH    AUXILIARY        S BORIC ACID EVAP RM - IN THE CENTER OF                  Judgmera vL Reshstc Meden          Yes BORIC ACID EVAPORATOR SKID                        THE ROOM                                              Centered Boor R          S 2      0    12-HE-25A      0  RADIOACTIVEWASTE EV/15GPM        AUXILIARY        15 GPM WASTE EVAP RM -8 FEET WEST OF                    Judgment vs. Rashstc Meehan        Yes              No    No RADIOACTIVEWASTE                                  THE BARRIER WALI 10 FEET ABOVE THE 594                Centered Boor Response Spectra EVAPORATOR HE-25 CONDENSER                        ELEVATION PLATFORM. 2 FEET ABOVE 15 GPM RADIOACTIVEWASTE EVAP DISTILLATE TANK 3      0      I 2&E-258    0  RADIOACTIVEWASTE Ev/15 GPM      AUXILIARY        15 GPM WASTE EVAP RM 10 FEET SOUTH OF              NIA  Judg/nant vL Rashstc ModlSh        Yos                    Yes RADIOACTIVEWASTE                                  THE ROOI/rS DOORWAY, ON THE WEST WALL                  Cantered Roar Response Spectra EVAPORATOR HE-25 DISTII.LATE COOLER 4      0    124tE-25C      0  RADIOACTIVEWASTE EVI 15 GPM      AUXILIARY        15 GPM WASTE EVAP RM - ON THE EAST SIDE                  Judgment VL Raahstc Moc4sn          Yos                    Yes      Yes RADIOACTIVEWASTE                                  OF THE DMDER WALI IN THE MIDDLEOF THE                  Centered Fker Response Spectra EVAPORATOR HE-25                                  ROOM CONCENTRATES COOLER 5      0    24/IRV-210    0  MAINSTEAM I STEAM GENERATOR      AUXILIARY        E MAIN STM STOP ENCl. tN THE NORTHWEST            N/A  Judgment vL RBahstc Mec4an          Yos OME4-1 STOP VALVE                                  REGION OF THE ROOM. GOING FROM 612                    Centered Roor Response Spectra ELEVATIONTO 640 ELEVATIONTHROUGH THE PLATFORM 6      0                    0  MAINSTEAM I STEAM GENERATOR      AUXIUARY          W MN STM STOP ENCl 15 FEET SOUTH OF                      Judgment vs. Reahstc Meehan        Yos      Yes            Yes      Yos OMEW2 STOP VALVE                                  THE NORTH WALIIN THE CENTER OF THE                    Centered Boor Response Spectra 647 PLATFORM 7      0    24/IRV-230    0  MAIN STEAM I STEAM GENERATOR    AUXILIARY        W MN STM STOP ENCL - IN THE MIDDLE                      JUdglllant VS. RBahstc Media/l      YBS            Yes OMEGA STOP VALVE                                  SOUTH PART OF THE ROOM                                Cantered Roar R          S 8      0    2 JJRV-240    0  MAINSTEAM I STEAM GENERATOR      AUXILIARY        E MAIN STM STOP ENCL - IN THE SOUTHWEST                  Judgment vs. Roshstc Meden          Yos            Yas    Yos OMEGA STOP VALVE                                  REGION OF THE ROOM, AT THE 640                        Centered Fker Response Spectra ELEVATION PlATFORM 9      0    24MEME        0  ESSENTIAL SERVICE WA I EAST    SGREENHOUSE  591.00 E ESSNTL SERV WTR PMP RM IN THE MIDDLE 591.00            Judynanl vL Restate Meden          Yes            Yes    Yes      Yes ESSENBAL SERVICE WATER PUMP                        WEST END OF THE ROOM                                  Cantered Roor Response Spectra PP.7E DISCHARGE STRAINER 10      0        24ME-      0  ESSENTIAl SERVICE WA I WEST    SCREENHOUSE  591.00 W ESSNTL SERV WLR PMP RM 5 FEET            591.00        Judynenl vL Rashstic Meden          Yos      Yes    Yos    Yes      Yes 34W            ESSENTIAL SERVICE WATER PUMP                      NORTH OF WEST ESSENTIAL SERVICE WATER                  Cantered Fker Response Spectra PP-7W DISCHARGE STRAINER                          PUMP &#xb9;2+P-?W 11      0        24C-12      0  BORON MAKEUP LGVCS) I SOUTH      AUXILIARY        BORIC ACID STOR TANKAREA IN THE                    NIA  Judgment vL Reshstc Medea          Yos                    Yes      YBS BORIC ACID FILTER                                  MIDDLE EAST REGION OF THE ROOM, 10 FEET                Centered Boor Response Spact/8 NORTHEAST OF SOUTH BORIC ACID STORAGE TANK&#xb9;2-TK-12S. NEAR THE FLOOR 12      0      24T-1 00-        DIESEL COMBUSTION Al/AB          GROUNDS          INNER PLANT GROUNDS -50 FEET                      NIA  Judgment vL Reahstc Meden          YBS      Yes,          YBs      YBS AB            EMERGENCY DIESEL AIR INTAKE                        NORTHWEST OF REFUELING WATER                          Centered Fker Response Spectra FILTER                                            STORAGE TANK&#xb9;2-TK43 13      0      24T-1 00-    0  DIESEL COMBUSTION Al/CD          GROUNDS          INNER PLANT GROUNDS -60 FEET                            Judgment vs. Rashstc Madam          Yos      Yos    Y8$    Yas      Yes CD            EMERGENCY DIESEL AIR INTAKE                        NORTHWEST OF REFUELING WATER                          Centered Fker Response Spectra FII.TER                                            STORAGE TANK&#xb9;2-TK-23 14      0      24T-104-      0  DIESEL COMBUSTION Al IAB          GROUNDS          INNER PLANT GROUNDS - 50 FEET                      N/A  Judgment vs. Raahstc Madrsn        Yes            Yes    Yes AB            EMERGENCY DIESEL EXHAUST                          SOUTHWEST OF UNIT 2 CONTAINMENTDOME                    Centered Floor Response Spectra SILENCER 15      0      24T  104. 0  DIESELCOMBUSTIONAIICD            GROUNDS          INNER PLANT GROUNDS -20 FEET                      NIA  Judgmam vL Reahstc Meehan          Yos      YBS            YBs CD            EMERGENCYDIESELEXHAUST                            SOUTHWEST OF UNIT 2 DOME                                Cantered Fker Response Spectra SILENCER CeltiTication:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or Type Name                                Signature                        Date                    Printor T pe Name                                Signature                    Date
 
~ '
Walkdown:            wl Outages                                                              DC CO            f2                                                                                qe  1of10 SCREENING VERIFICAT N DATA SHEET (SVDS)
Equip.to  Rev                                              Fker                Room or Row/Column                                  Capacity vs.          Cap >    Caveat5 Anchor        Equp Eq. Cl N/x      No                                              Elev.                                                                  Dem<<xl Basis          Domsnd7    0K7    OK7          OK7 0  ELECTRICAL DISTRIBUT/600VAG                587.00  587 HALLWAY IN THE SOUTH REGION OF THE 587.00    N/A    1.5 x Bounding Spectnsn vs.      Yes      Yes MOTOR CONTROL CENTER ABA                            HALLWAY,5 FEET SOUTHEAST OF CVCS                      Rear>>tie M<<fian C<<scrod Fker MONITORTANKS SOUTH TRANSFER PUMP                              Response Spectra
                                                                                &#xb9;I 2+PATS, NEAR THE EAST 0  ELECTRICAl DIST RIBUT / 600VAG  AUXILIARY  587.00  587 HALLWAY IN THE SOUTH REGION OF THE 587.00            1.5 x Boundeg Spectnm vs.        Yes      Y85 MOTOR CONTROL CENTER ABD                            HALLWAY,5 FEET EAST OF CVCS MONITOR                    ReaMc M<<fian Centered Floor TANKS NORTH TRANSFER PUMP &#xb9;12+P47N,                            Response S pact/a NEAR THE EAST 0  250VDC CONTROL AND I /          AUXILIARY  587.00  587 HALLWAY- IN THE SOUTH REGION OF THE 587.00          1.5 x Baxx4rg Spec/nm vs.        Yes              Yes CONTROL CENTER VALVE                                HALLWAY,5 FEET NORTHWEST OF CVCS                      Roar>>te Median Cantered Fker MONITORTANKS NORTH TRANSFER PUMP                              Response Spectra
                                                                                &#xb9;12+PATN 0  ELECTRICAL OISTRIBUT/600VAC      AUXILIARY  587.00  AB EMER DSL GEN RM - IN THE NORTHWEST                    1.5 x Bounding Spectnm vs.      Y85      Y45    Y45  Yes MOTOR CONTROL CENTER ASIA                          CORNER OF THE ROOM, 3 FEET SOUTH OF                    Rotc M<<fian Centered        Fker THE NORTH WAlL                                                R          S    a 0  ELECTRICAL DISTIUBUT/600VAC      AUXILIARY  587.00 AB EMER DSL GEN RM - IN THE NORTHWEST                    1.5 x Bounding Spactnm VL        Yes      Yos                  Yes MOTOR CONTROL CENTER ABD4I                          CORNER OF THE ROOM, 3 FEET SOUTH OF                    Reafsfic Median Centered Fker THE NORTH WALL                                                Res        S 0  ELECTRICALDISTR/BUT / 600VAG                587.00 CD EMER DSL GEN RM- IN THE SOUTHWEST      587.00  N/A    1.5 x Boundeg Spoctnm vL                                        Yes MOTOR CONTROL CENTER ABDG                          CORNER OF THE ROOLL ON THE SOUTH                        Rear>>tie M<<fian Contored Roar WALI10FEET WEST OF EMERGENCY DIESEL                          Response Spectra GENERATOR &#xb9;247ME 150CO 0  ELECTRICAL DISTRIBUT/600VAG                587.00 CD EMER DSL GEN RM - IN THE SOUTHWEST              N/A    1.5 x Bounding Spectnm vs.                Yes          Yes      Yss MOTOR CONTROL CENTER ABDO                          CORNER OF THE ROOM, NEAR THE SOUTH                      ReaMc MaSan Cantered Floor WAU10 FEET WEST OF CO EMERGENCY                              Response Spectra DIESEL GENERATOR &#xb9;243ME-1 50CD Zutav&      0  ELECTRICAL DISTRIBUT/600VAC      AUXILIARY  587.00 587 HALLWAY IN THE SOUTH END OF THE                      1.5 x Bounding Spctfulll vs. Yas      Yes    Yes  Y85    Yes VALVECONTROL CENTER ABYE                            HALLWAY,15 FEET SOUTHEAST OF SOUTH                    ReaMc M<<fish Centered Fbor BORIC ACID EVAPORATOR SUBPANEL &#xb9;12-                          Response Spectra BAES. NEAR THE SOUTH WALL 2utBV47    0  ELECTRICAL DISTRIBUT/600VAC      AUXILIARY  587.00 587 HALLWAY- IN THE SOUTHVVEST REGION                    1.5 x Bounding Spoctnm vs.                Y45 VALVECONTROL CENTER ABV47                            OF THE HALLWAY,NEAR THE WEST WALI3                    ReaMc M<<fian Cantered Fker FEET NORTHEAST OF THE WASTE GAS                              Response Spectra STORAGE TANKAREA 10                      0  ELECTRICAL DISTRIBUTION,        AUXILIARY  633.00 633 HALLWAY- NEAR THE SOUTH SECTION OF    633.00  N/A    1.5 x 6/xsxsng Spectnm VL                              Yes    Yes 600VAC/600VAC MOTOR                                  THE HALLWAY,2 FEET NORTH OF NBFT                      Rear>>te Median Centered Fker                                          t CONTROL CENTER ALM                                  ROD/ifS ENTRANCE                                              Re        S 0  ELECTRICAL DISTRIBUT/600VAG      AUXILIARY  633.00 633 HALLWAY- IN THE SOUTH SECTION OF                      1.5 x Boaxsng Spootrum VS.      Yes      Y45          Yes ~
MOTOR CONTROL CENTER AM47                            THE HALLWAY,2 FEET NORTH OF                            Reasstic Median Centered Boor CONTAINMENTAUXILIARIESSUBPANEL &#xb9;2-                            Response Spectra CAS. NEAR THE WEST WALL 12                      0  ELECTRICAL OISTRIBUT/600VAG                609.00 609 HALLWAY- 15 FEET EAST OF THE                  N/A    1.5 x Boundeg Specuum vs.                  Y45    Yes          Yss VALVECONTRol CENTER AZVut                          NORTHEAST SIDE OF EAST COMPONENT                      ReaKs6c Modish Centered    Boor COO UNG WATER HEAT EXCHANGER &#xb9;24IE-                            Rasper>>e Spoor/8 15E. 5 FEET ABOVE THE FLOOR 13                        0  ELECTRICAL DISTRIBUT/600VAG      AUXILIARY  613.00 4IO/ ROOM - MEZZANINEAREA IN THE                  N/A    1.5 x Bounding Spec/nm vs.      Y45                            Y85 MOTOR CONTROL CENTER EZGA                          SOUTHEAST PART OF THE ROOM, 10 FEET                    ReaMc M<<fisn Centered Fker NORTH OF THE SOUTH WALL                                        Response S      a 14                        0  ELECTRICAL DISTR/BUT/600VAG                613.00 4KV ROOM MEZZANINEAREA - IN THE                          1.5 x B/xmdsXI 8 poctnm vL                Yes          Yos MOTOR CONTROL CENTER EZG4I                          SOUTHEAST PART OF THE ROOM, 4 FEET                    Realistic M<<&#xb9;en Cantered Fbor NORTH OF THE SOUTH ENO OF THE ROOM                            Response S      a Certification:
Allthe information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
I 2  /1 lo (?>>
Print or T pe Name                              Si nature                          Date                  Print or T pe Name                                in    re                  Date
 
I Walkdown:              ~l Outages                                                            DC CO          .T2                                                                              .ge 2of10 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl  Equp.lo            System/Equsxnont Descnptcn    Buklmg.                      Room or Row/Coke              Base                  Cspscsy vs.            Csp >                      Eqvp No.                                                                                                        Elev.                Demand Bash            Demand?      OK?            OK7 15    1    2~04'            ElECTRICAL DISTRIBUTI 600VAG    AUXILIARY 613.00  4KV ROOM- MEZZANNEAREA- N THE                            1.5 x Bounding Sp<<trum vs.        Yes    Y4$        Yes    Yes MOTOR CONTROL CENTER EZCC                          NORTHEAST CORNER OF THE ROOM, 4 FEET                    Reasstic Median Centered Fkor SOUTH OF THE NORTH WAU 5 FEET NORTH                            Response Spectra OF 600VAC MOTOR CONTROL 16    1    2~C47        0  ELECTRICAL DISTRIBUT/600VAG      AUXILIARY 613.00  4KVROOM MEZZANINEAREA INTHE                      N/A    1.5 x Bouncnng Speci/um vs.      Yes    Yos        Yes    Yos MOTOR CONTROL CENTER EZGO                          NORTHEAST PART OF THE ROOM, 8 FEET                      Rear>>dc M<<f>>n Centered Boor SOUTH OF THE NORTH WAlL                                        Respor>>e Spectra 17    1      2+SA        0  ELECTRICAL DISTRIBUT I600VAC  SCREENHOUSE 594.00  TRAVELSGRN MCG UPPER RM 10 FEET                          1.5 x Boondng Spectrum vs.        Yes    Yes                Yes MOTOR CONTROL CENTER PSA                          NORTHWEST OF THE ROOLTS ENTRANCE                        Reagsgc M<<f>>n Centered Fkor DOORWAY, ON THE WEST WAlL                                      R        4 18            2-PSQ      0  ELECTRICAL DISTRIBUT I 600VAG  SCREENHOUSE 594.00  TRAVEL SCRN MCC UPPER RM - ON THE                        1.5 x BoundsX? Spectrum vs.      Yes    Yos          Yes    Yes MOTOR CONTROL CENTER PSQ                          WEST WALLOF THE ROOM, 2 FEET NORTH OF                  Roafistic M<<fisn Centered Fkor THE ROOLrs ENTRANCE                                            Response S
                                                                                                                                                  ~
19            2-21A      0  ELECTRICAL DISTRSUT/600V BUS              609.00  4KVRM 600VSWGRAREA INTHE                                1.5 x Boundog Spectrum vs.        Y4$  Yes          Yos 21A SWITCHGEAR                                    NORTHWEST REGION OF THE ROOM, 20 FEET                  ReaMc Median Centered Fker NORTH OF 600 VAC TRANSFORMER &#xb9;2 TR 21A                        R          S 2-21A1      0  ELECTRICAL DISTRIBUT I REACTOR  AUXILIARY 609.00  4KV RM-600V SWGR AREA IN THE                            1.5 x            Sp<</rum vs.      Yos  Y4$          Yos    Yos ROD CONTROL SOUTH MOTOR                            NORTHWEST REGION OF THE ROOM. N                        RoaMc Median Center<<l Boor GENERATOR SET CRDMG-2S                            600VAC SWITCHGEAR &#xb9;24IA, 6 FEET ABOVE                          Response Spectra SUPPLY BREAKER                                    THE FLOOR 21    2      2-21A10    0  ELECTRICAL DISTRIBUTIWEST                  609.00  4KVRM 600VSWGRAREA INTHE                          N/A    lh  x Boundng Sp<<tium vs.              Yos Yes      Yes    Yes TURBINE AUXILIARYCOOLING                          NORTHWEST REGION OF THE ROOM, IN                        Rear>>tic M<<fian Centered Fkor WATER PUMP PP-1 4W SUPPLY                          600VAC SWITCHGEAR    &#xb9;2-2IA                                  Rospons4 Spectra BREAKER 2      2-21A11    0  ELECTRICAL DISTRIBUT/600VAC      AUXILIARY 609.00  4KVRM-600VSWGRAREA N THE NW                              1.5 x Boundstg Spocfuifi vs.      Yos  Yes          Yos    Yos BUS 21A SUPPLY BREAKER                            REGION OF THE ROOM, IN 600VAC                          RoaMc Median Centered Boor SWITCHGEAR &#xb9;2-21A, 6 FEET ABOVE                                R                a 2-21A2    0  ELECTRICAL DISTRIBUT /600VAC              609.00  4KV RM 600V SWGR AREA N THE NW                          1.5 x Boundstg Sp<<t/um vs.        Yes  Yos Yes      Yes    Yes MCC AM4 SUPPLY BREAKER                            REGION OF THE ROOM, ON 600VAC                          ROSSSSc  Median Centered Boor SWITCHGEAR &#xb9;2-21A, 5 FEET ABOVE THE                            Response Spectra FLOOR 24            2.21A4    0  ELECTRICAL DISTRIBUT I SOUTH    AUXILIARY 609.00  4KVRM 600VSWGRAREA INTHE                          N/A    1.5 x sounding Spectrum vs.      Yos  Yes Yes      Yes    Yes PLANT LIGHTINGTRANSFORMER                          NORTHWEST REGION OF THE ROOM, IN                        Rear>>tic Median Centered Boor TR4.TGSS SUPPLY BREAKER                            600VAC SWITCHGEAR &#xb9;241A. 6 FEET ABOVE                          Response Spectra THE FLOOR 25            2-21 AS    0  ELECTRICAL DISTRIBUT/600VAC      AUXILIARY 609.00  4KV RM 600VSWGRAREA IN THE NW                            1.5 x Bouncstg Spectnan vs.      Yes  Yos Yos      Yos    Yesi Mcc ABDALSUPPLY BREAKER                            REGION OF THE ROOM, ON 600VAC                          ReaMc M<<fian Centered Fker SWITCHGEAR &#xb9;2-21/L 3 FT ABOVE                                  R        Spectra 2-21A6    0  ELECTRICAL DISTRIBUT I600VAC    AUXILIARY 609.00  4KV RM -600V SWOR AREA- IN THE NE                  N/A    1.5 x Boundng  Spectrum vs.            Yes          Yos MCCS AB4, PSA, TPPA AND                            REGION OF THE ROOM, ON 600V Ac                        Reef>>tic Median  Centered Fkor VCCS ABV~AZVASUPPLY                                SWITCHGEAR &#xb9;2-21A, 1 FOOT ABOVE                                Response  Spectra BREAKER 27    2      2-21 AS    0  ELECTRICAL DISTRIBUT/600VAG      AUXILIARY 609.00  4KVRM 600VSWGRAREA INTHE                                1.5 x Soundly Speci/um vs.        Yes  Yos BORIC ACID HEAT TRACE                              NORTHWEST REGION OF THE ROOM. N                        ReaMc Median Centered Boer CONTROL CENTER SHE SUPPLY                          600VAC SWITCHGEAR &#xb9;24IA, 4 FEET ABOVE                          Rasper>>e Spectra BREAKER                                            THE FLOOR 28      2      2-21A9    0    ELECTRICAL DISTRIBUT/600VAC    AUXIUARY  609.00  4KV RM 600V SWOR AREA IN THE NW                          1.5 x Boundstg Sp<<I/urn vs.                          Yos Mcc EZCAE SUPPLY BREAKER                          REGION OF THE ROOM, ON 600VAC                          RoaMc M<<gsn Contored Boor SWITCHGEAR &#xb9;2-21A, 1 FOOT ABOVE THE                            Respcnse Spectra FLOOR Yes'ertification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
I 2  /It    fyS Print or T pe Name                              Si nature                        Date                    Print or T pe Name                                i n  ture              Date
 
Walkdown:              al Outages                                                            DC CO          iT2                                                                              ge  30f10.
SCREENING VERIFICATION DATA SHEET (SVDS)
Item  Eq. Cl  Equip.to  Rev      Srstam/Equipmant DeSCripten                                                                                                            Csp a  Cavests              Equip No.      No                                                                                                                                            Demand?  OK?    OK?          OK?
29    2      241 AC        ELECTRICAL DISTRIBUT / 600V BUS  AUXILIARY 609.00 4KV RM -600V SWOR AREA - IN THE                          1.5 x Boundstg Specuum vs.              Yas  Yes  Yes      Yes 21ATO 600V BUS 21C TIE BREAKER                      NORTHWEST REGION OF THE ROOM. IN                        RSSMc Median Centered Fker 600VAC SWITCHGEAR &#xb9;2.21A, 2 FEET ABOVE                        Respor>>e Spectra THE FLOOR 30    2        2.218        ELECTRICAL DISTRIBVT/600VBUS      AUXILIARY 609.00 4KVRM 600VSWGRAREA INTHE                                1.5 x Boundeg Spectrum vs.      Yes    Yos 218 SWITCHGEAR                                      NORTHWEST REGION OF THE ROOM, IN                        RSSMc Median Centered Rcor 600VAC SWITCHGEAR &#xb9;2-2M, 2 FEET ABOVE                          Respor>>e Spectra THE FLOOR 31    2      24181      0  ELECTRICAL DISTRIBUT/600VAC        AUXILIARY 609.00 4KV RM - 600V SWGR AREA - IN THE NE                      1 5 x Basxieg Specuum  vs.      Yes    Yes  Yes Mcc ABD4r SUPPLY BREAKER I2.                        REGION OF THE ROOM, 6 FEET ABOVE THE                    Resrr'c M<<fisn Cantered  Fbor ELSC                                                FLOOR                                                          R        8 32    2      2-21810    0  ELECTRICAL DISTRIBUT/PLANT        AUXILIARY 609.00 4KVRM-600VSWGRAREA INTHE                                1.5 x Boundeg Specuum  vs.                        Yas AIR COMPRESSOR OMERt SUPPLY                        NORTHEAST REGION OF THE ROOM. IN                        RSSMc M<<fisn Centered    Boor                                Yes'es BREAKER                                            600VAC SWITCHGEAR &#xb9;2-218, NEAR THE                            Response Spectra FLOOR 33    2      2-21811    0  ELECTRICAL DISTRlBVT/600VAC                        4KV RM -600V SWOR AREA - IN THE NE                      1.5 x Basxfsig Spectrum vs.                                  Yos BUS 218 SUPPLY BREAKER                              REGION OF THE ROOM, ON 600V AC                          Rotc Median Centered    Rear SWITCHGEAR &#xb9;2-218. 6 FEET ABOVE                                Res      Spectra 34    2      2-21812    0  ELECTRICAL DISTRIBUT / SOUTH      AUXILIARY 609.00 4KV RM - 600V SWOR AREA - IN THE                        1.5 x Baxiding Spectnm vs.      Yas                Yes
                                                                                                                                                ~
NON-ESSENTIAL SERVICE WATER                        NORTHEAST REGION OF THE ROOM, tN                        ReaMc Median Centered Rcor PUMP Pals SUPPLY BREAKER                          600VAC SWITCHGEAR &#xb9;2-218, 2 FEET ABOVE                        Response Spectra THE FLOOR 35    2      2-21813    0  ELEGTRCAL DISTRIBUT/TURBINE      AUXILIARY 609.00 4KV RM - 600V SWOR AREA - IN THE                        1.5 x          Specaum vs.      Yes    Yes        Yes ROOM INDUCTION HEATNG,                            NORTHEAST REGION OF THE ROOM, IN                        RSSMc M<<fisn Centered Fker STRESS RELIEF AND BOLT                            600VAC SWITCHGEAR &#xb9;2-218, NEAR THE                            Respof>>e Spectra HEATERS SUPPLY BREAKER                            FLOOR 36    2      2-2182    0  ELECTRICAL DISTRIBUT/600VAG      AUXILIARY 609.00 4KV RM - 600V SWOR AREA - IN THE NE                      1.5 x Bounding Spact/um vs.      Yas    Yes  Yes  Yas    Yes MCC EZC4I SUPPLY BREAKER                          REGION OF THE ROOM, IN 600V AC                          Raststb Median Centered Fker SWITCHGEAR &#xb9;2-21 8, 5 FEET ABOVE THE                          Rasper>>e Spectra FLOOR 37    2      24183      0  ELECTRICAL DlSTRIBVT/600V BUS    AUXILIARY 609.00 4KVRM 600VSWGRAREA-INTHE                  609.00  WA    1.5 x Boundeg Spectrum vs.      Yes    Yes  Yes  Yes    Yas 21 8 SPARE CIRCUIT BREAKER                        NORTHEAST REGION OF THE ROOM. IN                        Rear>>dc M<<fian Centered Fbor 600VAC SWITCHGEAR &#xb9;2-218, 4 FEET ABOVE                        Response Spectra THE FLOOR 2.2185    0  ELECTRICAL DISTRIBUT l600V                        4KVRM-600VSWGRAREA INTHE                                1.5 x Boundeg Spectnsn vs.      Yes    Yes        Yes      Yes MOTOR CONTROL CENTERS TBG-                        NORTHEAST REGION OF THE ROOM. IN                        Realisdc Median Centered Fbor BWANDTBP4IN SUPPLY BREAKER                        600VAC SWITCHGEAR &#xb9;2-218, 4 FEET ABOVE                        Response Spectra THE FLOOR 39    2      2<186      0  ELECTRICAL DISTRIBUT/EAST        AUXILIARY 609.00 4I0/RM 600VSWGRAREA-INTHE                                1.5 x Bounding specuum vs.      Yos          Yes  Yes    Yas TURBINE AUXIUARYCOOUNG                            NORTHEAST REGION OF THE ROOM, IN                        Rotc M<<fisn Cantered    Fbor WATER PUMP PP-1 4E SUPPLY                          600VAC SWITCHGEAR &#xb9;2-21 8, 4 FEET ABOVE                        Response Spectra BREAKER                                            THE FLOOR 2-2180      0  ELEGTRCAL DISTRIBUT l600V BVS    AUXILIARY 609.00 4KV RM 600VSWGRAREA-INTHE                  609.00  N/A  1.5 x Bourx4ng Spectnsn vs.              Yos        Yes    Yes 218 TO 600V BUS 21D TIE BREAKER                    NORTHEAST REGION OF THE ROOM, IN                        RSSMc M<<fisn Centered Fker 600VAC SWITCHGEAR &#xb9;2-218. 2 FEET ABOVE                        Response Spectra THE FLOOR 41    2        2-21C      0  ELECTRICAL DLSTIUBUTl600V BUS                      4KV RM-600V SWOR AREA IN THE,                            14 x Bounding Spectrum vs.      Yes    Yes 21C SWITCHGEAR                                    NORTHWEST REGION OF THE ROOM, 20 FEET                  Rear>>tic Median Centered Fker NORTH OF 600VAC SUPPLY TRANSFORMER                            Response Spectra
                                                                                  &#xb9;2-TR21C Certification:
Allthe information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and concfuslon (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
                                                                                        \'ZING/    45 Print or T pe Name                                S  nature                      Date                    Print or T pe Name                              i    ture              Date
 
Walkdown:              .ml Outages                                                            DC C          .SIT 2                                                                            . dge    4of10 SCREENING VERIFICATION DATA SHEET (SVDS)
Item  Eq. Ci  Eqi/p.lo  Rav      SYstam/Equipmont Doscnpten              Fker              Room or Row/Coksnn            Base                    Capacity vs.        Cap >  Csvaats        Interact  Eqcsp No.      No                                              Elev.                                          Ekrv.                  Demand Basis                  OK?    OK?      OK?    OK?
Demand?
42      2      2-2101    0  ELECTRICAL DISTRIBUT/600V BUS              609.00 4KVRM 600VSWGRAREA NTHE                                  1.5 x Bounding Spectrum vs.
                                                                                                                                                  ~
21C SUPPLY BREAKER                                NORTHWEST REGION OF THE ROOM. N                        ROSMc Mocrisn Centered Fbcr 600VAC SWITCHGEAR &#xb9;2-21C, 4 FEET ABOVE                        Response Spectra THE FLOOR 43      2      2-21C10    0  ELECTRICAL DIST/UBUT/600VAC                609.00 4KV RM-600V SWGR AREA- N THE                            1.5 x            Spectrum vs. Yes Mco ABD4; AND 2 JAN SUPPLY                        NORTHWEST REGION OF THE ROOM, IN                        ROOMc Marfian Centered Fker BREAKER                                          600VAC SWITCHGEAR &#xb9;2-21C, 1 FOOT ABOVE                        Response Spectra THE FLOOR 44      2      2-21G11    0  ELECTRICAL DISTRIBUT/600V BUS              609.00 4KVRM 600VSWGRAREA-NTHE                                  1.5 x Bounding Spectrum vs.            Yos  Yos              Yes 21C SPARE CIRCUIT BREAKER                          NORTHWEST REGION OF THE ROOM. N                      ROOMc Marfian Centered Fker 600VAC SWITCHGEAR &#xb9;2.21C                                      Res        S      a ELECTRICAL DISTRIBUT I SOUTH
                                                                                                                                                  ~
45      2      2-21012    0                                              60900  4KVRM-600VSWGRAREA NTHE                          N/A    1.5 x Boistding Speci/um vs.                                    Yes SPENT FUEL PIT PUMP 12+P41S                      NORTHWEST REGION OF THE ROOM. N                        Rearisdc Median Cantered Fbor SUPPLY BREAKER                                    600VAC SWITCHGEAR &#xb9;2-21C                                      Re        S      a 46      2      2.21G13    0  ELECTRICAL OISTRIBUT I          AUXILIARY 609.00 4KVRM 600VSWGRAREA-N THE                          N/A    1.5 x            Speci/um vs.
RECIPROCATNG CHARGING PUMP                        NORTHWEST REGION OF THE ROOM, IN                        RsaMc Mtxfian Centered Fbor PP<9 SUPPLY BREAKER                              60OVAC SWITCHGEAR &#xb9;2-21C, 2 FEET ABOVE                        Response Spectra THE FLOOR 47      2      2-21014    0  ELECTRICALDISTRIBUT I FIRE                609.00 4KV RM 600V SWGR AREA - N THE                            1.5 x Bounding Spachum vs.              Yas  Yes      Yes
                                                                                                                                                  ~
PROTECTION WATER HIGH                            NORTHWEST REGION OF THE ROOM, IN                        ROOMc Mefian Cantered Fker DEMAND PUMP PP-11 SUPPLY                          600VAC SWITCHGEAR &#xb9;2-21C                                      Response Spectra BREAKER 48      2      2-21016    0  ELECTRICALDISTRIBUT I600VAC                609.00 4KV RM 600V SWGRAREA-5 THE                        N/A    1.5 x            Specuum vL                  Yes      Yes      Yes MOTOR COMTROI. CENTER TBCCN                      NORTHWEST REGION OF THE ROOM, IN                        ROOMc Median Cantered Fbol SUPPLY BREAKER                                    600VAC SWITCHGEAR &#xb9;2-21C, 4 FEET ABOVE                        Response Spectra THE FLOOR 49      2      2-21G1?    0  ELECTRICALDISTRIBUT I NORTH                609.00 4KV RM 600V SWGR AREA - N THE                            1.5 x Bounding Spectrum vs.            Yes  Yas      Yas      Yes NONESSENTIAL SERVICE WATER                        NORTHWEST REGION OF THE ROOM. N                        ReaMc Median Cantered Fbor PUMP PP4N SUPPLY BREAKER                          600VAC SWITCHGEAR &#xb9;2-21C. 4 FEET ABOVE                        Response Spectra THE FLOOR 50      2      2-21016    0  ELECTRICALDISTRIBUT I MAN                  609.00 4KV RM 600V SWGR AREA - IN THE                    N/A    1N x Bounding Spectrum vs.              Yas  Yes      Yes      Yos TURBINE AUXIUARYLUBE OIL                          NORTHWEST REGION OF THE ROOM, IM                        ROSMc Mediian Centered Fbor PUMP QT-201 SUPPLY BREAKER                        600VAC SWITCHGEAR &#xb9;2-210, NEAR THE                            Response Spectra FLOOR 51      2  =    2-21C2      0  ELECTRICAL DISTRIBUT I                    609.00 4KV RM - 600V SWGR AREA - N THE                  N/A    1.5 x Bounding Spectrum vs.                            Yos      Yes COMTANMENTPOLAR CRANE OM-                        NORTHWEST REGION OF 'THE ROOM, N                        ROOMc Median Centered Fbcr 4 SUPPLY BREAKER                                  600VACSWITCHGEAR &#xb9;241C,2FEETABOVE                              Response Spectra THE FLOOR 52      2      24103      0  ELECTRICAL DISTRIBVT/600VBUS              609.00 4KVRM-600VSWGRAREA N THE                                1.5 x Bounding Spectnsn vs.            Yes                    Yes 21C SPARE CIRCUIT BREAKER                        NORTHWEST REGION OF THE ROOM, IM                        Realistic Median Cantered Fbcr                                      /
600VAC SWITCHGEAR &#xb9;2.21C, NEAR THE                            Response Spectra FLOOR 2-21 G4    0  ELECTRICAl DISTRIBUTI                      609.00 4KV RM - 600V SWGR AREA - IN THE                        1.5 x Bounding Spectrum vs.                  Yos CIRCULATINGWATER TRAVELING                        NORTHWEST REGION OF THE ROOM, N                        Retdistb Median Centered Fker SCREEN SOUTH WASH PUMP PP-                        600VAC SWITCHGEAR &#xb9;2-21C, 4 FEET ABOVE                          Response Spectra 15S SUPPLY BREAKER                                THE FLOOR 54    2      2-2106      0  ELECTRICAL DISTRIBUT/600VAC                609.00 4KV RM - 600V SWGR AREA - N THE                          1.5 x Bounding Spectrum vs. Yes          Yas      Yos      Yes Mcc EZC4'UPPLY BREAKER                            NORTHWEST REGION OF THE ROOM, ON THE                    ROOMc Mtxfisn Centered Fker 600VAC SWITCHGEAR &#xb9;2-21C                                        R          Spectra 55    2      2-210?      0  ELECTRICAL DISTRIBUT/600V BUS              609 00 4KV RM -CD 4KV SWGR AREA- IN THE                  N/A    1.5 x Solacing Spectrum vs.                  Yes              Yes 21C SPARE CIRCUIT BREAKER                        NORTHWEST REGION OF THE ROOM, IM                      - Rearnsc Median Centered Fker 600VAC SWITCHGEAR &#xb9;2-21C                                        Re        S    a Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signato/y should be a licensed professional engineer.)
Print or T  e Name                              Si nature                      Date                  Print or T pe Name                                    ture                  Date
 
Walkdown              wl Outages SCREENING VERIFlCA DC  C,lT          2 DATA SHEET (SVDS)
                                                                                                                                                                                                        .ge  50f10 Equip.ID  Rev No. No                                                                                                                                                Cap >  Caveats                    E~
Demand?  OK?        OK?            OK?
56      2      2-2108    0  ELECTRICAL DISTRIBUTIPLANT                          4KVRM 600VSWGRAREA-INTHE                                  1.5 x Boulxbng Spectrum vs.      Yes    Yos        Yes            Yes AND CNTMT STANDBY LIGHTING                          NORTHWEST REGION OF THE ROOM, IN                        Reahbc Median Centered Fkior TRANSFORMER TR4.TGa SUPPLY                          600VAC SWITCHGEAR &#xb9;2-21C,4 FEETABOVE                            Response Spectra BREAKER                                              THE FLOOR 57      2      2.2109    0  ELECTRICAL DISTRIBUT I MANAND    AUXILIARY  609.00 4KV RM 600VSWGR AREA- IN THE                              1.5 x Bandrtg Spectrum vs.        Yes              , Yes            Yos SPARE TRANSFORMER                                    NORTHWEST REGION OF THE ROOM, IN                        ROSKstic Median Centered Fker AUXILIARIESNORMAL                                    600VAC SWITCHGEAR &#xb9;2-21C, 4 FEET ABOVE                          Respor>>o Spectra DISTRIBUTION CABINETTCSN                            THE FLOOR SUPPLY BREAKER 58      2      2-21D    0                        I ELECTRICAL OLSTRIBUT 600V BUS    AUXILIARY  609.00 4KV RM - 600V SWGR AREA - IN THE            609.00  NIA  15 x Boulxbng spearum vs.        Yes    Yes                Yes 21D SWITCHGEAR                                      NORTHEAST REGION OF THE ROOM, 20 FEET                    Roarisbc M<<fran Centered Fkor NORTHWEST OF 600VAC SUPPLY                                      Response Spectra TRANSFORMER &#xb9;2-TR21D 59    2      2-2101        ELECTRICAL DISTRIBUT/600V BUS    AUXILIARY  609.00 4KV RM - 600V SWGR AREA - IN THE            609.00  NIA  1.5 x Boundeg Spectrum vs.                Yes        Yes    Yes    Yes 21D SUPPLY BREAKER                                  NORTHEAST CORNER OF THE ROOM, IN                        Reafisbc M<<fian Centered Fbor 600VAC SWITCHGEAR &#xb9;2.21D, 4 FEET ABOVE                          Response Spectra THE FLOOR 60    2  =  2-21D10    0  ELECTRICAL DISTRIBUTINORTH                          4KVRM-600VSWGRAREA INTHE                                  1.5 x Bandstg PLANT UGHTING TRANSFORMER                                                                                                    Spectrum vs.      Yos NORTHEAST REGION OF THE ROOM, IN 600V                    Rearisdc Moctsn Centered Fkor TR4.TGeN SUPPLY BREAKER                              SWITCHGEAR      &#xb9;2-21D, NEAR THE FLOOR                          R        8 61    2    2-21D11        ELECTRICAL DISTRI BUT I 600V      AUXILIARY  609.00 4KV RM - 600V SWGR AREA - IN THE                          1.5 x Bounding Spectrum vs.      Yes    Yos        Yes    Yes    Yes BORIC ACID HEAT TRACE                                NORTHEAST REGION OF THE ROOM, ON 600V                    Rear>>tic Median Centered Fkor CONTROL CENTER BHT4I SUPPI.Y                        SWITCHGEAR &#xb9;2-2'ID, 6 FEET ABOVE THE                            Response Spectra BREAKER                                              FLOOR 62    2    2-21D13    0  ELECTRICAL DISTRIBUTIREACTOR                        4KVRM 600VSWGR AREA IN THE                  609.00  NIA  1.5 x Bouaanp Spectrum vs.        Yos                Yes    Yes    Yes ROD CONTROL NORTH MOTOR.                            NORTHEAST REGION OF THE ROOM, ON 600V                    Rearisbc Median Centered Fkor GENERATOR SET CRDMG-2N                              SWITCHGEAR &#xb9;2-21D, 6 FEET ABOVE THE                            Rospor>>o Spectra SUPPLY BREAKER                                      FLOOR 63    2    2-21014    0  600VAG DISTRIBUTIONI 600VAC                          4KVRM 600VSWGRAREA-INTHE                    6I8.00  NIA  1.5 x Bouixbng Spectrum vs.      Yes    Yes                      Yos MCC 2 JIBE, VCC 2~47,    Mcc 2-                      NORTHEAST REGION OF THE ROOM, ON 600V                    Rear>>tic M<<fian Centered Fbor PRO SUPPLY BREAKER                                  Ac SWITCHGEAR &#xb9;2-21D, 1 FOOT ABOVE THE                          Response Spectra FLOOR 64    2      2-21D3    0  ELECTRICAL DISTIUBUTI                                4KV RM - 600V SWGR AREA - IN THE            609.00  NIA  1.5 x Boundrtg Speansn vs.                          Yes            Yes CONTA!NMENT UGHTNG                                  NORTH EAST PART OF THE ROOM. N 600VAC                    Roaf>>tic Median Centered Floor TRANSFORMER TR4.TG.t 0 SUPPLY                        SWITCHGEAR      &#xb9;2-21D, NEAR THE FLOOR                          Response Spectra BREAKER 2-21D4    0  ELECTRICAL DISTRIBUT/600V BUS                        4KV RM 600V SWGR AREA - IN THE              609.00  NIA  1.5 x Boundrig Specburn vs.
21D SPARE CIRCUIT BREAKER                            NORTHEAST PART OF THE ROOM, N 600VAC                    Roar>>tic M<<fian Centered Fkor SWiTCHGEAR      &#xb9;241D, 4 FEET ABOVE THE                        Response Spectra FLOOR 66    2      2-21DS    0  ELECTRICAL OISTRIBUT/600VAC      AUXILIARY . 609.00 4KVRM 600V SWOR AREA IN THE                              1% x Boundrtg S pact/um vs.      Yes    Yes        Yes            Yes Mcc ABDAL SUPPLY BREAKER                            NORTHEAST REGION OF THE ROOM, IN                        Real>>tic Median Centered Boor 600VAC SWITCHG EAR &#xb9;2-21D, 3 FEET ABOVE                        Response Spectra THE FLOOR 67    2      2-21D6    0  ELECTRICAL DISTRIBUT I 600VAC    AUXILIARY  609.00 4KV RM-600V SWGR AREA- IN THE                            1.5 x Boundstg Spectnsn vs.                          Yes    Yes    Yes Mcc EZG47 SUPPLY BREAKER                            NORTHEAST REGION OF THE ROOM, IN                        Realhdc Median Centered Fkcr 600VAC SWITCHGEAR &#xb9;241D, 1 FOOT ABOVE                          Respor>>e Spectra THE FLOOR 2.21D8    0  ELECTRICAL DISTRIBUT I600VAC      AUXILIARY  609.00 4KVRM 600VSWGRAREA-INTHE                                  1.5 x Bounding Specuum vs.                Yes        Yes            Yes Mcc AM47 SUPPLY BREAKER                              NORTHEAST REGION OF THE ROOM. IN                        Rear>>bc M<<fran Centered Fkor 600VAC SWITCHGEAR &#xb9;2 21D, 5 FEET ABOVE                          Respor>>e Spect/a THE FLOOR Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
Print or T    Name                              S nature                          Date                    Print or T pe Name                              S'    ure                      Date
 
Walkdown:            ical Outages                                                                    DC CO        i<IT 2                                                                                    cage 6of10 SCREENING VERIFICATION DATA SHEET (SVDS) item  Eq. Cl  Equp.lo    Rev    Systa/I/Equipment D scnption                    Floor              Room or Row/Column Na        No                                                      Elov.
capacity vs.          Cap >  Caveats    Anchor Demand Basis          Dan and7  OK7        OK7              OK7 2-21D9      0  ELECTRICAL DISTRIBUTIMAINAND                      609.00 4KV RM -600V SWGR AREA- IN THE            609.00  N/A  1$ x Bourxfng S pact/um vs.      Yes                          Yes    Yes SPARE TRANSFORMER                                        NORTHEAST REGION OF THE ROOM, IN                        Realistic Median Centered Boor AUXILIARIESEMERGENCY                                      600VAC SWITCHGEAR &#xb9;2-21D, 2 FEET ABOVE                        Response Spect/0 DISTRIBUTIONCABINETTCSE                                    THE FLOOR SUPPLY BREAKER 70      2    242<YA        0  REACTOR TRIP BREAKER I                    AUXILIARY 609.00 CRD EQUIP RM IN THE MIDDLEWEST                          1.5 x Bourxling Spect/Um VS.      Yes      Yes                Yes    Yes REACTOR ROD CONTROL TRA                                    REGION OF THE ROOM, ON 260/1 50 VAC ROD                ROOSstic Median Centered  Roar REACTOR TRIP BYPASS CIRCUIT                                CONTROL MOTOR~NERATOR SET                                      Response Spectra BREAKER                                                    SWITCHGEAR &#xb9;2<RDSWGR 71      2    2424IYB      0  REACTOR TRIP BREAKER I                    AUXILIARY 609.00 CRD EQUIP RM - IN THE MIDDLEWEST                  N/A  1.5 x Bounding Spectrum vs.                          Yes      Yes    Yes REACTOR ROD CONTROL TRAN B                                REGION OF THE ROOM. ON 260/150 VAC ROD                  Reahtic Median Centered Boor REACTOR TRIP BYPASS CIRCUIT                                CONTROL MOTORNENERATOR SET                                    RospoA$ 0 Spoctfa BREAKER                                                    SWITCHGEAR &#xb9;24'RDSWGR 72      2    24241 TA      0  ROD CONTROL AND INST I                    AUXILIARY 609.00 CRD EQUIP RM IN THE MIDDLEWEST                    N/A  1.5 x Boundstg Spect/um vs.                                    Yes    Yas REACTOR ROD CONTROL TRAN'A                                REGION OF THE ROOM. IN BREAKER                          ReaMc Median Centered Fbor REACTOR TRIP CIRCUIT BREAKER                              COMPARTMENT &#xb9;242+TA 3 FEET ABOVE                              Response Spectra THE FLOOR 73      2    2424tTB      0  ROD CONTROL AND INST I                    AUXIUARY  609.00 CRD EQUIP RM - IN THE MIDDLEWEST          633.00        1 ex Boufxteg Spectrum vs.
REACTOR ROD CONTROL TRAN                                  REGION OF THE ROOM, IN BREAKER                          ReaMc Mafian Centered Boor TRIP CIRCUIT BREAKER  S'EACTOR COMPARTMENT &#xb9;24241TB, NEAR THE FLOOR                          Res    seS      0 74      3      2-721 A    0  4KV ELECTRICAL DISTR I 4KV BUS            AUXILIARY 609.00 4KVRM AB4KVSWGRAREA                                      1.5 x Boundeg Spectrum vs.                No T21A SWITCHGEAR                                                                                                    ReaMc MaSsn Centered Fbor Res        Spectra 75      3    2-T21Al      0  ELECTRICAL DISTRIBUTI SOUTH              AUXILIARY 609.00 4KVRM AB4KVSWGRAREA INTHESE                609.00  N/A  1.5 x Boundsxl SpctfUfrl vs.      Yes                          Yes    Yes SAFETY INJECTION PUMP PP465                                REGION OF THE ROOM, IN 4 KVSWITCHGEAR                  ReaMc Mafian Centered Roar SUPPLY BREAKER                                            &#xb9;2-721A, IN BREAKER COMPARlMENT &#xb9;2-                            Response Spect/a l21A1 76    3    2-T21A10      0  ELECTRICALDISTRIBUT I 600V BUS            AU/QLIARY 88.00  4KV RM AB 4KV SWGR AREA - IN THE MIDDLE 609.00    NIA  1.5 x Bourxteg Spect/um vs.
21A SUPPLY TRANSFORMER TR21A                                                                                                                                                      Yes SOUTH REGION OF THE ROOM, DI 4KV                        ReaMc MaSan Centa ed Floor SUPPLY BREAKER                                            SWITCHGEAR &#xb9;2.T21A NEAR THE FLOOR                              Res        S 77    3    2-T21A11      0  ELECTRICAL DISTRIBUT I AB                AUXILIARY 609.00 4KV RM AB 4KV SWGR AREA - IN THE MIDDLE 609.00          1.5 x BoundiAQ Spoctfunl vs.      Yes                          Yes    Yes EMERGENCY DIESEL GENERATOR                                SOUTH REGION OF THE ROOM. IN 4KV                        ReaMc Median Centered Floor TO 4KV BUS T21A SUPPLY                                    SWITCHGEAR &#xb9;2-T21A, NEAR THE FLOOR                            Response Spectra BREAKER 76    3    2-T21A12      0  ELECTRICALDISTRIBUT I CIRCUiT            AUX/LIARY 609.00 4KV RM AB 4KVSWGR AREA - IN THE MIDDLE 609.00            1.5 x Bounding SpoctfUnl vs.                                  Yes    Yes BREAKER FROM 69KV TO BUS T21A                              SOUTH REGION OF THE ROOM, IN 4KV                        ReaMc M<<fian Centered Fker SWITCHGEAR &#xb9;2-T21A                                            Response S 79    3      2-T21A2      0  ELECTRICAL DISTRIBUTIWEST                ANQI.IARY 609.00 4KV RM AB 4KV SWGR AREA - IN THE SE                      1$ x ouuxt4ing s pact/Um vs.                                  Yes MOTOR DRIVEN AVXFEEOWATER                                  REGION OF THE ROOM. IN 4KV SWITCHGEAR                  ReaMc M<<fian Cantered Fker PUMP PP4W SUPPLY BREAKER                                  &#xb9;2-T21A. NEAR THE FLOOR                                        Response S 2-T21 A3    0  ELECTRICALDISTRIBUT/WEST                  ANQUARY  6t8.00 4KVRM AB4KVSWGRAREA INTHE                          N/A  1$ x Boufxtirg Spectrum vs.
CONTAINMENTSPRAY PUMP PP Yes      Y0$    Yeo SOUTHEAST REGION OF THE ROOM, IN 4KV                    Realisdc Mafian Centered Fker QW SUPPLY BREAKER                                          SWITCHGEAR &#xb9;2-T21A                                            R          S    0 61    3      2-T21A4      0  ELECTRICAL DISTRIBUT I WEST                        609.00 4KV RM - AB 4KV SWGR AREA ut THE                        1.5 x Ouurxtstg Spectnsn vs.                                  Yes    Yes RESIDUAL HEAT REMOVALPUMP                                  SOUTHEAST REGION OF THE ROOM, IN 4KV                    ReaMc MaSan Centered Boor PP45W SUPPLY BREAKER                                      SWITCHGEAR &#xb9;2-T21A. NEAR THE FLOOR                            R          S    a 2-T21A5      0  ELECTRICALDISTRIBUT/WEST                  AUXILIARY 609.00 4KVRM AB4KVSWGRAREA-INTHE                          N/A  1$ x BCUAONQ Spectnsn vs.                                            Yos ESSENTIAL SERVICE WATER PUMP                              SOUTHEAST REGION OF THE ROOM, IN 4I0/                  ReaMc MaSsn Centered Roor PP-7W SUPPLY BREAKER                                      SWITCH GEAR &#xb9;2-T21A NEAR THE FLOOR                            R                a S
Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                                          nature                        Date                  Print or T pe Name                                    tule I                                Date
 
Walkdown:            ical Outages                                                            DC CO i i<IT2                                                                                  rage 70f10 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. CI  Equip.lo  Rov                                                                Room or Row/Goantn Na        No                                                                                                                                            Cap >  Cavoats              Equip Demand?  OK?                  OK?
3    2.T21A6      0  ELECTRICAL DISTRIBUTI 4KV BUS                      4KVRM A84KVSWGRAREA INTHE                              1.5 x Boundng Spectrum vs.
721A TO 460V PRESSURIZER                                                                                                                    Yes          Yes SOUTHEAST REGION OF THE ROOM. IN 4KV                  ReaKstic M<<fian Centered Fbor HEATER BUS SUPPLY                                  SWITCHGEAR &#xb9;2-T21A                                            Response Speara TRANSFORMER      TR21PHA SUPPLY BREAKER 3    2-T21AT      0  ELECTRICAL DISTIUBUTIWEST                          4KV RM - AB 4KV SWOR AREA - IN THE                      1.5 x Boundng Spectrum vs.                            Yes    Yes COMPONENT COOUNG WATER                            SOUTHEAST REGION OF THE ROOM, IN 4KV                  RoaMc M<<fian Centered Roor PUMP PP 10W SUPPLY BREAKER                        SWITCHGEAR &#xb9;2-72IA, NEAR THE FLOOR                            Ros      S      0 3    2.T21A8      0  ELECTRICAL OISTRIBUT I WEST                        4KV RM -AB 4KV SWOR AREA IN THE MIDDLE                  1.5 x Boundng Spectrum vs.      Yes    Yos  Yes    Yes    Y45 CENTIBFUGALCHARGING PUMP                          SOUTH REGION OF THE ROOM                              Realisdc M<<fian Centered Fker PP40W SUPPLY BREAKER                                                                                            R        S      a 3    2-T21A9      0  ELECTRICAL DISTRIBUT /4KV BUS    AUXILIARY 609.00 4KV RM - AB 4KV SWOR AREA IN THE MIDDLE                1.5 x Bandng Spectrum vs.        Yas    Yes  Yes    Yos    Yes 2A TO BUS T21A TIE BREAKER                        SOUTH REGION OF THE ROOM, IN THE 4KV                  R0SKstb Median Centered Floor SWITCHGEAR &#xb9;2-T21A                                            R        8 Br      3      2.T218      0  4KV ELECTRICAL DISTR /4KV BUS    AUXILIARY 609.00 4KVRM A84KVSWGRAREA-                                    1h x Bandng Spectrum va          Yes    Y05  Yos    Yes    Yes T21A SWITCHGEAR                                                                                          ReaKstic M<<Kan Centered Fkor Res      S 3    2.T2181      0  ELECTRICAL OISTRIBUT I 4KV BUS    AUXILIARY 609.00 4KV RM -AB 4KV SWGR AREA-INTHE MIDDLE                  1.5 x Bandng Spectrum va.                      Yes    Yes    Yes 28 TO 4KV BUS T218 TIE BREAKER                    WEST REGION OF THE ROOM, ON 4KV                        ReaMc Median Centered Fker SWITCHGEAR <<2-T218                                            R        S 3    2.T2182      0  ELECTRICAL DISTRIBUTI CIRCUIT    AUXILIARY 609.00 4KVRM-AB4KV SWGR AREA IN THE MIDDLE 609.00        WA    1.5 x Boundng S pctrurll vs. Yes    Yos  Yes    Yes  Yes BREAKER FROM 69N/ BUS TO BUS                      WEST REGION OF THE ROOM. IN 4KV                        ReaKstic Median Centered Fkcr T218                                              SWITCHGEAR &#xb9;2-7218. NEAR THE FLOOR                            R 3    2-T2184      0  ELECTRICAL DISTRBUT I AS                          4KV RM-AB4KV SWGR AREA IN THE MIDDLE                    1.5 x Boundng Spectrum vs.              Yes    Yes          Y45 EMERGENCY DIESEL GENERATOR                        WEST PART OF THE ROOM. tN 4I0/                        ReaMc Median Centered Fkor To 4KV BUS 7218 SUPPLY                            SWITCHGEAR &#xb9;2-7218, IN THE LOWER                              Response Spectra BREAKER                                            COMPARTMENT 2-T21C      0  4KV ELECTRICAL OLSTR I4KV BUS    AUXIUARY  609.00 4KV RM - CO 4KV SWOR AREA-                              1h x Boundng  Spectrum vs.      Yes                  Y45  Yes 721 C SWITCHGEAR                                                                                          RoaKstic M<<Ktn Centered Roar Res      Spectra 3    2-T21C1      0  ELECTRICAL DISTRIBUT/4KVBUS      AUXILIARY 609.00 4KV RM - CD 4KV SWGR AREA - IN THE        609.00  N/A  1.5 x Bandng S pecuum vs.                      Y45    Yes  Y05 2C TO 4KV BUS T21C TIE BREAKER                    NORTHEAST PART OF THE ROOM, ON 4KV                    ReaMc M<<Kan Centered Fbor SWITCHGEAR &#xb9;2-T21C                                            R        Spectra 3    2-T2102      0  ELECTRICAL DISTRIBUT I CIRCUIT    AUXILIARY 609.00 4KV RM -600V SWGR AREA IN THE                          1.5 x Bandng Spectrum vs.        Yes    Yes    Yos    Yes  Y45 BREAKER - 4KV FROM 69KV TO                        NORTHEAST REGION OF THE ROOM                          ReaMc Median Centered Fbor BUS 721C                                                                                                        Res    ~S 3    2-T2103      0  ELECTRICAL DLSTRIBUT/CD          AUXILIARY 609.00 4KV RM GD 4KV SWOR AREA - IN THE                        1.5 x Bandng S pact/unl vs.      Yes-  Yes            Yes  Yos EMERGENCY DIESEL GENERATOR                        NORTHEAST REGION OF THE ROOM, IN 4KV                  ReaKstb Median Centered Fbor TO4N/BUS 721C SUPPLY                              SWITCHGEAR &#xb9;2-T21C                                            Response S peeve BREAKER 3      2-T21D      0  4KV ELECTRICAL DISTR I4KV BUS    AUXIUARY  609.00 4KV RM - CD 4KV SWOR AREA-                              1.5 x Bandng specuurn    vs. Yos    Yos    Y45    No    No  '
T21D SWITCHGEAR                                                                                          ReaMc M0Chsn Centered    Fkor Res    4S      0 2-T21D1      0  ELECTRICAL DISTRIBUT I 4KV        AUXIUARY  609.00 4KV RM - CD 4KV SWOR AREA - IN THE        609.00  N/A  1.5 x Bandng Specaum    vs. Yes    Yes    Yes    Yes EMERGENCY POWER BUS EP TO                          SOUTHWEST REGION OF THE ROOM, IN 4KV                  ReaMc M<<Kan Cantered    Floor 4KV BUS 721D SURPLY BREAKER                        SWITCHGEAR &#xb9;2 T21D                                            Re      S 3    2-T21DI 0    0  ELECTRICAL DISTRIBUTIEAST        AUXIUARY  609.00 4KV RM - CD 4KV SWOR AREA - IN THE                      1.5 x Bandng Spectrum vs.        Yos    Yes            Yos  Yes ESSENTIAL SERVICE WATER PUMP                      SOUTHWEST REGION OF THE ROOM, IN 4N/                  ReaMc Metfan Centered Fkcr PP-? E SUPPLY BREAKER                              SWITCHGEAR &#xb9;2-T210                                            R        Spectra Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
I~/l        /~~
Print or T pe Name                                Si nature                        Date                  Print or T pe Name                              S n ure                    ate
 
Walkdown:              .Gal    Outages                                                              DC COL        . ~ IT 2                                                                            . age  80f10 SCREENING VERIFICATION DATA SHEET (SVDS)
Equo.tu                  System/Etsspmem Oeanpuon                Fker                Room or Reer/Column                                  Capaccy vL            Cap 4  Caveats Anchor            Equrp No.                                                            Elev.                                                                    Demand Basis          Demand?  OK?    OK?              OK?
2-T21011              ELECTRICAL DISTRIBUT / EAST      AUXILIARY 609.00  4KV RM - CD 4KV SWGR AREA IN THE                        14 x Boundstg Spectnsn va        Yos      Yes            Y45      Y4$
MOTOR DRIVEN AUXIUARY                                SOUTHWEST REGION OF THE ROOM. IN 4KV                    Rest'asc Median Centered Fker FEEDWATER PUMP PP4E SUPPLY                          SWITCHGEAR <<2.T210                                            Response Spectra BREAKER 2-T21012              ELECTRICAL DISTRIBUT/4KVBUS                          4KVRM CD 4KV SWGR AREA-INTHE                            1.5 x Boundng Spectrum vs.      Yos            Yes 20 TO 4KV BUS T21D TIE BREAKER                      SOUTHWEST REGION OF THE ROOM, IN 4KV                    Rearssc Median Centered Boor SWITCHGEAR <<2.T21D                                            Re        S    0 2-T21D2              ELECTRICAL DISTfuBUT / 600V BUS    AUXILIARY 609.00  4KVRM-CD4KVSWGRAREA INTHE                                1.5 x Boundstg Spectnsn vs.      Yes      Yos    Yes      Y4$      Yes 21D SUPPLY TRANSFORMER                              SOUTHWESf REGION OF THE ROOM, IN 4KV                    Reasssc Met&#xb9;an Centered Fkcr TR21D SUPPLY BREAKER                                SWITCHGEAR &#xb9;2-7210. NEAR THE FLOOR                              R        Spectra 101          2-721 03          0  ELECTRICAL DISTRIBUT/EAST        AUXILIARY 609.00  4KV RM - CD 4KV SWGR AREA - IN THE                      1.5 x Bounding Spectnsn vs.      Yes      Yes    Yes              YOS COMPONENT COOUNG WATER                              SOUTHWEST REGION OF THE ROOM, IN 4KV                    R4$ 7$ 5c M<<fsm Centered Fkor PUMP PP-10E SUPPLY BREAKER                          SWITCHGEAR &#xb9;2-T21D                                              Re        S 2.721D4              ELECTRICAL OISTRIBUT  / EAST                      4KVRM CD4KVSWGRAREA-INTHE                                1,5 x Boundrtg Spectrum va      Yos      Yes            Y0$      Yos CONTAINMENTSPRAY PUMP PP-9E                        SOUTHWEST REGION OF THE ROOM, IN 4KV                    Rearstic M<<fian Cenlered Floor SUPPLY BREAKER                                      SWITCHGEAR <<2-T21D                                              R        8 2 72105          0  ELECTRICAL DISTRIBUTINORTH                          4KVRM CD4KVSWGRAREA INTHE                                1.5 x Boundstg Spectrum vL                Yes    Yes SAFETY BLIECTION PUMP PP46N                        SOUTHWEST REGION OF THE ROOM, IN 4KV                    Rearnsc MaSan Centered Boor SUPPI.Y BREAKER                                    SWITCHGEAR &#xb9;2-21D                                              Re        S 2-T2106          0  ELECTRICAL DISTRIBUT/ EAST        AUXILIARY 609.00  4KV RM 600V SWGR AREA. IN SOUTNVEST      609.00  N/A    1.5 x Boundstg Specuum va        Yes RHR PUMP PP45E SUPPLY                              REGION OF THE ROOM, IN 4KV SWITCHGEAR                  Rearut/c Median Centered Fker BREAKER                                            &#xb9;2-721 0, NEAR THE FLOOR                                        R        S 2.T21D7          0  ELECTRICAL OISTRIBUT/ EAST                          4KVRM-CD4KVSWGRAREA INTHE                609.00  WA    1.5 x Boundang Spectrum vs.      Yes                      Yes    Yos CENTIUFUGALCHARGING PUMP                            SOUTHWEST REGION OF THE ROOM, IN 4KV                    Rearssc Median Centered Fker PP40E SUPPLY BREAKER                                SWITCHGEAR &#xb9;2 T21D                                              R        8 2-721 D8          0  ELECTRICAL DISTRIBUT/CD                            4KVRM CD4KVSWGRAREA INTHE                609.00  tl/A    1.5 x Botstdstg Speci/um vs.            Yes    Yes      Yes    YOS EMERGENCY DIESEL GENERATOR                          SOUTHWEST REGION OF THE ROOM, IN 4IN                    Rearsric Median Centered Fker TO 4KV BUS T21D SUPPLY                              SWITCHGEAR <<2-T210                                              R0$ pcnse Spoctni BREAKER 107          2-T21D9              ELEC1'RICAL DISTRIBUT / 4KV BUS                    4KV RM - CD 4KV SWGR AREA - IN THE                        1.5 x Boundstg S pact/um vs.            Yes    Yes      Y4$    Yes 7210 TO 480V PRESSURIZER                            SOUTHWEST REGION OF THE ROOM. IN 4KV                    Rearndc Median Centered Roar HEATER BUS SUPPLY                                  SWITCHGEAR <<2-T21D                                              Response Spectra TRANSFORMER        TR21PHC SUPPLY BREAKER 24RI04-                120V CONTROL ROOM IN / 10KVA      AUXILIARY        4KV RM -600V SWOR AREA - IN THE MIDDLE                    1.5 X BoundNg  Spoctnsn VL      YOS    Yes                      Yos CVT                TRANSFORMER CONSTANT                                EAST REGION OF THE ROOM, 7 FEET SOUTH                  Reasstic Median  Centered Fkcr VOLTAGE                                            OF 600VAC BUS 21B SUPPLY TRAN                                  R4        8      0 24 RI041-              120VAC DISTRIBUTION/120V AC      AUXILIARY        4KV RM 600V SWGR AREA-                                    1.5 x Boundstg  Spectrum vs. Yes    Yes    Yes      Y4$    Y4$
CVT                GR INST DISTR CH41 ISOL CONT                                                                                Rearndc Median    Centered Rcor VOLT TRANSFORMER                                                                                                    R        S      4 110          24;RID41-              120V CONTROL ROOM IN / 10KVA                        4KV RM - 600V SWGR AREA-                                  1.5 x Boundstg  Spectrum vs.                    Yes      Y0$    YOS, ISOLIMITER CONSTANT VOLTAGE                                                                                Reasstic Median  Centered Boor TRANSFORMER                                                                                                        Re        S      0
                                                                                                                                                          ~
CV1'4;RIO-IV-120V CONTROL ROOM IN / 'I OKVA    AUXILIARY 609.00  4KV RM - 600V SWGR AREA                                  1.5 x Boundeg Spectrum vs.      Y4$    YOS                      Yos CVT                IsolJMITER- CONSTANT VOLTAGE                                                                                ROSMc Mecssn Centered Reer TRANSFORMER                                                                                                        Re        S 112          24?GAB            0  DIESEL GENERATION, C/AB          AUXILIARY  587.00  AB EMER DSL GEN RM - IN THE MIDDLE        587.00  N/A    1.5 x          Spectrum vs. Yes    YOS                      Yos FFCKT                EMERGENCY DIESEL GENERATOR                          NORTH REGION OF THE ROOM, 5 FEET WEST                  Rearrsdc Median Centered Floor OME-150AB FIELD FLASH CIRCUIT                        OF ROOLrS DOORWAY, INSIDE N SIDE OFAB                          Response Spectra TRANSFORMER                                          EDG CONTROL SUBPANEL 14IGAB, 2'BOVE FLOOR Certification:
Allthe information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Printor T pe Name                                      Si nature                        Date                  Print or T pe Name                                in  ure                      ate
 
Walkdown              .cal Outages                                                            DC C          ./IT 2                                                                              . age  gof10 SCREENING VERIFICAT ON DATA SHEET (SVDS) item  Eq. CI    Equip. ID  Rev      System/Eqcspment Descnptxn    8uadng. Fker              Room or Row/Coaxrn                                                          Gap s    Cavsats                Eral No.      No                                              Elsv.                                            Elsv.                                        Danand7    OK7                  OK7 113      4    247GCO      0  DIESEL GENERATION, C/CD          AVXIUARY          CDEMEROSLGENRM INTHEMIDDLE                587.00  NIA    1.5 x Bounding Spectrum vs.                            Yes FFCKr          EMERGENCY DIESEL GENERATOR                        SOUTH REGION OF THE ROOM, 5 FEET EAST                  Realstic Median Centered Fbor OME-150CD FIELD FLASH CKT                          OF CD EMERGENCY DIESEL GENERATOR                              Response Spectra TRANSFORMER                                        ROOM
'114    4                  0  120VI220 CONTROl. AND /                            CD ENIER DSI. GEN RM IN THE MIDDLENE                    15 x Boundng Spectrum vs.                        Yes AUXILIARYFEEDWATER                                  REGION OF ROOM, 10 FT NORTH OF CD                      Realsdc MaSan Centasd Fker 12$ 208VAC DISTRIBUTION PANEL                      EMERGENCY DIESEL GENERATOR &#xb9;243ME-                            Response Spectra AFW SUPPLY TRANSFORMER                              15040, NEAR THE NORTH 115      4    2-TR<LSC      0  120V/220 CONTROI. AND I          AUXILIARY        AB EMEROSLGENRM IN THE NWCORNER          587.00  N/A    1.5 x Bouncing Specctum vs.      Yes            Yes    Yes    Yes 12$ 208VAC EMERGENCY LOCAL                        OF THE ROOLL ON THE EAST WALL                          Roar>>dc Median Centered Fbor SHUTDOWN DISTRIBUTION                                                                                              Response Spectra TRANSFORMER 116      4    2-TR21A      0  ELECTRICAL DISTRIBUT/600V BUS                      4KV RM 600V SWOR AREA N THE                              1S x Bocndng    Spectrum vs. Yes                    Yes    Yes 21A SUPPLY TRANSFORMER                              SOUTHWEST REGION OF THE ROOM                            Rear>>tie Median  Centered Fker Res      S 117      4    2-TR21B      0  ELECTRICAL OISTRIBVT/600V BUS    AUXILIARY        4KV RM 600V SWOR AREA- IN THE                            1.5 x Boundng  Spectrum vs.                    Yss    Yes 21B SUPPLY TRANSFORMER                              SOUTHEAST REGION OF THE ROOM                            ReaMc Mafian Centered Boar Re 116      4    2-TR21G      0  ELECTRICAL DISTRIBVT/600V BVS    AUXILIARY        4KV RM GD 4KV SWGR AREA !N THE            633.00  NIA    1.5 x Bocndng Spoof/Ill vs.                              Yes
                                                                                                                                                    ~
21 C SUPPLY TRANSFORMER                            SOUTHWEST REGION OF THE ROOM. 15 FEET                  Rear>>tie M<<san Centered Boor SOUTHWEST OF SOUTH PLANT LIGHTING                              Response Spectra TRANSFORMER &#xb9;2-TR4.TG48 119    4    2-TR21D      0  ELECTRICAL DISTRIBVT/600VBUS                      4KVRM 600VSWGRAREA NTHE                  633.00  N/A  1.5 x          Spectrum va                              Yes    Yss 21D SUPPLY TRANSFORMER                            SOUTHEAST CORNER OF THE ROOM, NEAR                      Rea%stic  Mafian Centaod Fker THE EAST WALL                                                  R        S      a 120    16                0  250VDG CONTROL AND                                633 HALLWAY 2 FEET SOUTH OF THE'tr        633.00  NIA  1.5 x Boundng S pact/um vs.      Yes            Yes    Yss    Yes INSTRUMENTATION/ BATTERY                          TRAIN BATTERY ROOM. NEAR THE EAST WALL                  Rearstb Mafian Centered Fker CHARGER A FOR N-TRAIN                                                                                            Response Spectra BATTERY 121    16    24IC4%1      0  250VDC DISTRIBUTION/PLANT                  613.00 4KV ROOM - MEZZANINEAREA - IN THE        633.00  NIA  1.5 x Boundng Spsctnsn vs.      Yes                    Yes    Yss BATTERY BATT~ BATTERY                              NORTHWEST PART OF THE ROOM, 3 FEET                      ReaMc Median Centered Boor CHARGER &#xb9;1                                        SOUTH OF 600VAC MOTOR CONTROL CENTER                          Response Spectra 92M~
122    16    2+C4EB2      0  250VDG DISTRIBUTIONI PLANT      AUXILIARY  613.00 4KV ROOM - MEZZANINEAREA - N THE          633.00  NIA    15 x Boundng Spectrum vs.                      Yes    Yes BATTERY BATTER CHARGER &#xb9;2                          MIDDLENORTH PART OF THE ROOM, 15 FEET                  ReaMc Median Centered Boor SOUTH OF 600VAC MOTOR CONTROL CENTER                          Response Spectra
                                                                                    &#xb9;2~O47 123    16                  0  250VDC CONTROL AND              AVXll.lARY        633 HALLWAY-10 FEET SOUTHWEST OF THE      633.00  NIA    1.5 x Boundng Spectrum vs.      Yes                    Yes
                                                    /
INSTRUMENTATION BATTERY                            'K TRAIN BATTERY ROOM, NEAR THE EAST                    RsaMc Median Centered Fker CHARGER B FOR N-TRAIN                              WALL                                                          Rsspcnse Spectra BATTERY 124    16    24IG4:DI      0  250VDG DISTRIBUTION/PLANT                          CD BATTERY EQUIP AREA - IN SOUTH END OF    633.00  NIA    1.5 x Boundng Spectrum va                              Yes    Yes BATTERYBATTO CHARGER &#xb9;1                            ROOM, NEAR THE WEST WALL                                RsaMc Mafian Centered Fker R        6 125    16    24ICC02      0  250VDC DISTRIBUTION/ PLANT      AUXILIARY          CD BATTERY EQUIP AREA IN SOUTH END OF    633.00  NIA    1.5 x Boundng Spectrum vs.      Yes      Yes  Yes    Yes BATTERY BATTED CHARGER &#xb9;2                          ROOM. NEAR THE EAST WALL                              Rotc      Median Csntaed Fbor R        Spectra 126    16    2CRID4-      0  120VAG CONTROL ROOM            AUXILIARY          INVERTER AREA N THE MIDDLEEAST                          1$  x Boundng  Spectrum vs.                            Yes INV            INSTRVMENTATIONDISTRISUTION                        REGION OF THE ROOLL 20 FEET NORTHEAST                  Realsuc Msc5an Centered Fker SYSTEM /120VAC CONTROI. ROOM                      OF THE ROOM'S ENTRANCE                                        Response Spectra INSTRUMENT DISTRIBUTION SYSTEM CHANNEL I INVERTER Certification Allthe information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seislnic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
(</f4        Ical Print or T pe Nalne                              S'ature                          Date                  Print or T pe Name                                S'a    re                  Date
 
Walkdown:,rical Outages                                                                    DC CO        ~FIIT 2                                                                            :age 10of10 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl  Equip.lD Rev                                              Floor            Room or Row/Column                                    Cepacrty vs.          Cap o  Caveats              Equip No. No                                              Eiev.                                                                  Demand Basta          Demand?    OK?                  OK?
12?      'l6  2CRKHI-    0  120V CONTROL ROOM                AUXILIARY  608.00  INVERTER AREA IN THE MIDDLEEAST                          1h x Boundsto Spect/um vs.      Yes      Yes  Yes    Yes    Yes INV                              I INSTRUMENTATIONDISTR 120VAC                        REGION OF THE ROOM, 20 FEET NORTHEAST                  Rea5stic Median Centered Rcor CONTROL ROOM INSTRUMENT                            OF THE ROOM'S ENTRANCE                                        Response Spectra DISTRIBUTION SYSTEM CHANNEL II INVERTER 16    2CRIIMII-  0  120V CONTROL ROOM                AUXILIARY  609.00 INVERTER AREA IN THE SotfntWEST                  NIA    1.5 x Boundsta Spect/um vs.              Yes  Yes    Yes    Yes.
INV        INSTRUMENTATIONDISTR I 120VAC                      CORNER OF THE ROOM, 15 FEET NORTH OF                    Reasstic Median Centered Boor CONTROL ROOM                                        THE Root/rs ENTRANCE                                          Response Spectra INSTRUMENTATIONDISTRIBUTION SYSTEM CHANNEL Ill INVERTER 16    24RID-IV-  0  120V CONTROL ROOM                AUXILIARY  608.00 CONTROL ROOM IN THE SOUTHEAST PART              NIA    1.5 x Boundsta Spectrum vs.                    Yes    Yes    Yes INV        INSTRUMENTATIONDISTR /120VAC                        OF THE ROOM, ON THE WEST WALL                          Reasstic Median Centered Fkxtr CONTROL ROOM INSTRUMENT                                                                                            Response Spectra DISTRIBUTION SYSTEM CHANNEL IV INVERTER 16                0 DIESEL GENERATOR. CONTROL 6      AUXIUARY    58?.00 AB EMER OSL GEN RM - IN THE NORTHEAST            N/A      1.5 x Boundsta S pact/um vs,    Yes      Yes  Yes    Yes    Yes INSTRUMENTATIONI AB                                REGION OF THE ROOSL 10 FEET NORTHEAST                  Reassdc Median Centered Boor EMERGENCY DIESEL GENERATOR                          OF AB EMERGENCY DIESEL GENERATOR &#xb9;2-                          Response Spect/a OME ISOAB INVERTER                                  OME-1 504B 131    'l6              0 DIESEL GENERATION. CONTROL 6    AUXILIARY  587.00 CD EMER DSL GEN RM - IN THE MIDDLE                        1.5 x Boundsta Speci/um vL                    Yes    Yes    Yes I
INSTRUMENTATION CD                                  SOUTH PART OF THE ROOM, 10 FEET                        Reaastic Median Centered Fkor EMERGENCY DIESEL GENERATOR                          SOUTHWEST OF CD EMERGENCY DiESEI.                              Response Spectra OME-1 SOLD INVERTER                                  GENERATOR EXCITER &#xb9;2<ME-I 5OCD-EXC Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and condusion (whether veNied to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. Allsignatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
(z l(~ r'wc Print or T pe Name                            Si nature                        Date                  Print or T pe Name                                i n  ure                  Date
 
Walkdown;        .. of 10/04/93                                                            DC C          IIIT 2                                                                                      Page1of2 SCREENING VERIFICATION DATA SHEET (SVDS)
Equp.lo    Rev    System/Ettuyment Doscnpton              Fkor              Room or Roir/Column                                      Capacty vs.              Demander/
Cap >    Cavoats              Equp No.      No                                              Elev.                                                                    Demand Basis                        OK7    OK7          OIQ 2&ME<9      0  MAINSTEAM I AVXILLARYFEED        TURBINE  591.00  TB DRIVEN AUX FDWIR PMP -ut THE SW          591.00  N/A  Judgment vs. Roa/>>tic Median                                        YO5 PUMP TURBINE                                      CORNER OF THE ROOM, 2 FT. WEST OF THE                    Centered Fkor Response Spectra TDAFP 2+P4 2      5    LZ-PP<IS    0  SPENT FUEL PIT COOLI I SOUTH    AUXILIARY  609.00  SPENT FUEL PIT HEAT XCHGR RM IN THE                        1$ x Bouodeg 8 pact/urn vs.                  No SPENT FUEL PIT PUMP                                SOUTHWEST REGION OF THE ROOM. 4 FEET                      RoaKSKc  Meson Centered Rcor SOUTHOF SOVTH SPENTFUELPITHEAT                                  Response Spectra EXCHANGER &#xb9;124LE-LSS. NEAR THE FLOOR 3      5    2+P-LOE      0  COMPONENT COOUMG WAIEAST        AUXILIARY  609.00  609 HALLWAY- IN THE MIDDLE SOUTH END OF                    1.5 x Bounding Spect/um vs.        YOS      Yes          Y85    Y85 COMPONENT COOUNG WATER                            1HE HAUWAY, 30 F EET SOUTH OF EAST                        Rotc Median Centered        Boor PUMP                                              COMPONENT COOLING WATER HEAT                                    Response Spectra EXCHANGER &#xb9;24LE-1 5E. NEAR 4      5    24'P-10W    0  COMPONENT COOUNG WAIWEST        AUXILIARY  609.00  609 HALLWAY- IN THE SOUTHWEST END OF                      1.5 x Bouncing Specuum vs.          Yes      Yes          Y85    Y85 COMPONENT COOUNG WATER                            THE HALLWAY,NEAR THE WEST WALL                            ROSKstic Mefian Centered Fkor PUMP                                                                                                                Response Spectra 5      5    2-PP-26N    0                    I SAFETY INJECTION NORTH          AUXILIARY  587.00  N SAFETY INJ PMP RM - LN THE CENTER OF      587.00  N/A    M  x Ouxrx/rty Spool/um vs.                                      Yos SAFETY INJECTION PUMP                              THE ROOM                                                  ROSKstic Median Centered Floor Response Spectra 6      5    2+P-263          SAFETY INJECTION/ SOUTH        AUXILIARY  587.00  S SAFHYINJ PMP  RM-IN THE MIDDLEOF        587.00  N/A    1.5 x Bounding spool/um vs.                  Yes  Yes            Yes SAFETY NJECTION PUMP                              THE ROOM                                                  ReaKstic Median Centered Roor Re        S pectrs 7      5    2-PP4E          AUXILIARYFEEDWATER/EAST          TURBINE  591.00  E MTR DRIV AVXF EEDWrR PMP    - IN THE      591.00  N/A    LS x Sounding 8 pact/uin vs.      Yos                    Yes    Yes MOTOR DRIVEN AUXILIARY                            SOUTHWEST REGION OF THE ROOM                              ROSKSKc M<<Kan Centered Roor FEEDWATER PVMP                                                                                                      Res    so Spectra 8      5    2+P~        0  AUXILIARYFEEDWATER I WEST        TURBINE  59100  WMTR DRIVEN AUX FDWTR PMP IN THE            591.00  N/A    1.5 x Boundsty speci/um vs.                  Yes          Y85    YOS MOTOR DRIVEN AUXIUARY                              SOUTH END OF THE ROOM                                    ROSKstic M<<Kan Centered Roar FEEDWATER PUMP                                                                                                      Respor>>e S 9      5      2+P4          AUXILIARYFEEOWATER I TURBINE    TURBINE  591.00  TB DRIVEN AVXFDWLR PMP - LN THE CENTER      591.00  N/A    1.5 x Boundstg Spectrum vs.                        Y8$    Y85    Yes DRIVEN AUXIUARYFEED PUMP                          OF THE ROOM                                              Rear>>tic Mefian Centered Fker Response Spectra 10    5    2+P~        0  BORON MAKEUP (CVCS) I BORIC    AVXlt.lARY 587 00  BORIC ACID STOR TANKAREA- IN THE            587,00  NIA    1.5 x Bounding Spectrum ve          Yos      Yes  Yes    Yss    Yes ACID STORAGE TANKS TRANSFER                        MIDDLEEAST REGION OF THE ROOM, 15 FEET                    ROSKsdc Median Centered Floor PUMP &#xb9;3                                            SOUTHEAST OF MIDDLEBORIC ActD                                    Response Spectra STORAGE TANK812-TK-12M, NEAR THE FLOOR 11    5    2+P464      0  BORON MAKEUP (CVCS) I BORIC    AUXILIARY  587 00  BORIC ACID STOR TANKAREA- IN THE            587.00  N/A    1.5 x Boundstg Spectrum vs.                  Yos          Yos    Yes ACID STORAGE TANKS TRANSFER                        MIDDLEEAST REGION OF THE ROOM, 15 FEET                    Roar>>dc M<<Ksn Centered Floor PUMP &#xb9;4                                            SOUTHEAST OF MIDDLEBORIC ACID                                    Response Spectra STORAGE TANK&#xb9;12-TK-1 2M, NEAR THE FLOOR 12    5      24'P49    0  CHARGING (Cvcs) I              AUXILIARY  587.00  RECIPROCATING CHARG PMP RM - IN THE        587.00  N/A    1.5 x Bouncing S poet/um vs.        Yos      Yes  Yes    Yos    Yes RECIPROCATING CHARGING PUMP                        CENTER OF THE ROOM, 20 FEET SOUTHWEST                    ROSKstic  M<<fian Centered Fhor OF THE ENTRANCE DOOR                                            Response Spectra 13    5    24'P40E    0  CHARGING (CVCS) I EAST                      587.00  E CENTRIFUGAL CHARG PMP ROOM - LN THE      587.00  N/A    18 x Sounding S pectn&#xb9;n vs.        YOS            Yes    Y85    Yes CENTRIFUGAL CHARGING PUMP                          MIDDLEOF THE ROOM, 10 FEET SOUTH OF                      ROSKsdc Median Centered Fbor THE NORTH WALL                                                  Respor>>e S        8 14    5    2+P40W          CHARGING (CVCS) I WEST          AUXILIARY  587.00  W CENTRIFUGAL CHARG PMP RM-IN THE          587.00  N/A    1.5 x Boundsty Spectrum vs.                  Y85    Yes          Yos CENTRIFUGAL CHARGING PUMP                          NORTH CENTER OF THE ROOM                                ROSKstic Mefisn Conte/ed Floor Response Spectra Certification:            I All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
I~/ff for Print or T pe Name                              Signature                          ate                    Print or T pe Name                                  Si nature                    Date
 
l
~ ~ $
 
Walkdown:            of 10/04/93                                                          DC CO        BIT 2                                                                                Page2of2 SCREENING VERIFICATION DATA SHEET (SVDS)
Equip.lo  Rev                                            Fker            Room or Row!Coksnn              Base                  Captxxty vs.            Cap >                      Etsrp No.      No                                              Elev.                                            Elev.                Demand Basis            Dam and7                    OK7 15      5    2.PP42N      0  CONTROL ROOM AIR CON /        AUXILIARY          CTRL RM AIR CONDIT RM -5 FEET NORTH OF            NIA    1.5 x Boundng Spectrum vs.        Yes    Yes  Yos    Yes    Yos CONTROL ROOM AIR                                  CONTROL ROOM VENTILATIONNORTH Afc                        Reassdc Mtxssn Centered Fkxx CONDITIONINGNORTH CHIU.                          UNIT 6240MCRA-1 ~ NEAR THE NORTH                                Response Spectra WATER CIRCULATIONPUMP                            WALL6 FEET EAST OF CONTROL 16      5    2+P426      0  CONTROL ROOM AIR CON I                            CTRL RM AIR CONDIT RM 6 FEET EAST OF                      1.5 x Botstdsxt Spectrum vs.                          Yes    Yos CONTROI. ROOM AIR                                CONTROL ROOM AIR CONDITIONING SOUTH                      ROSMc Median Centered Fkor CONDmONING SOUTH CHILL                            LIQUID CHILLER $ 24IVV CR-2, NEAR THE                          Response Spectra WATER CIRCULATIONPUMP                            SOUTH WALL. 5 FEET WEST OF 17      6    2+P45E      0  RESIDUAL HEAT REMOVA/ EAST    AUXILIARY  573.00 EAST RHR PUMP RM IN THE CENTER OF THE      587.00        1.5 x Boundrtg  Spectrum vs. Yes    Yes          Yes RESIDUAL HEAT REMOVALPUMP                        ROOM                                                    Res2sdc Metssn  Centered Fkxx Ros        6      a 16      6 '4'P~W          0  RESIDUAL HEAT REMOVALWEST                  573.00 WRHRPMPRM-INTHECENTEROF THE                              1.5 x Boundstg  Spectrum vs. Yes    Yes  Yos            Yos RESIDUAL HEAT REMOVALPUMP                        ROOM                                                    ROSSSSc  Mixen Centered Floor Re        S      a 19      6    2+P-7E      0  ESSENTIAL SERVICE WAIEAST    SCREENHOUSE  591.00 E ESSNTL SERV WTR PMP RM - IN THE          591.00          1.5 x Boundrtg Spectrum vs.      Yes    Yes  Yos    Yes    Yes ESSENTIAL SERVICE WATER PUMP                      CENTER OF THE ROOM, ON THE PLATFORM, 7                  Reahstic Median Centered Fkxx FEET ABOVE THE FLOOR                                            Res      eS      ~
6    2+P-7W      0  ESSENTIAL SERVICEWAI WEST    SCREENHOU55. 591.00 W ESSNTL SERV WTR PMP RM - iN 'THE        591.00          1.5 x Boundstg Spectrum vs.      Yes        Yes    Yes    Yes ESSENTIAL SERVICE WATER PUMP                      SOUTHEAST PART OF THE ROOM                              Rearisdc Median Centered Boer Res        S      a 21      6    24'P4E      0  CONTAINMENTSPRAY I EAST        AUXILIARY  573.00 E CONT SPRAY PMP RM IN THE SOUTHEAST                      1.5 x Boundstg Spectrum vs.      Yes    Yes  Yos    Yes    Yes CONTAINMENTSPRAY PUMP                            PART OF THE ROOM                                        Roassdc Metric Centered Fker Response S        a 6    2+P-9W      0  CONTAINMENTSPRAY/WEST          AUXILIARY  573.00 W CONT SPRAY PMP RM IN THE CENTER OF              NIA    1.5 x Btxxxt4ng Spectrum vs. Yes    Yes  Yos    Yes CONTANMENTSPRAY PUMP                              THE ROOM                                                Rearndc Median Centered Fker Res        S      a Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
(z.l(/ les Print or Type Name                            Si nature                        D te                    Print or Type Name                                Si nature                Date
 
r
  >Ti
 
Walkdown:          . of 11/8/93                                                                DC CO        .<IT 2                                                                            Page1of6 SCREENING VERIFICATION DATA SHEET (SVDS)
Equy.ro    Rev      Srstom/Eqrspmont Doscnpticn              Flsor              Room or Row/Cohen No.
Capactr vs.            Cap >>  Caveats Anchor      Equp No                                                Elev.                                                                Demand Basis            Demand?  OK?    OK7        OK?
2-DRY@07    0    I MAIN STEAM LEADS                          621.00  W MAINSTEAM STOP ENCCLOSURE.      4'W OF  609.00      Boundrng Spectrum vs. SSE CONDENSATION DRAIN TANKTK                            SG STOP VALVE&#xb9;14lRV430, NEAR THE FLIL                  Ground Response Spectrum 200, OUTLET SHUTOFF VALVE 2      7    2-FRV.245    0  AUXILIARYFEEDWATER I WEST          TURBINE  591.00  WMTR DRIVEN AUXFDWTRPMP 20 FEET                    Yos  Boundrng Spectrum vs. SSE      Yos    Yos    N/A    Yes  Yes MOTOR DRIVEN AUXIUARYFEED                            NORTHWEST OF THE ROLLUP DOOR                            Grcwnd Response Spectrum PUMP  PP~2    AIR OPERATED                        ENTRANCE. NEAR THE WEST WALL,4 FEET TEST VALVE                                          ABOVE THE FLOOR 3      7    2-FRV.247    0  AUXILIARYFEEDWATER/WEST            TURBINE  59 l.00 W MTR DRIVEN AUX FDWTR PMP - IN THE        633.00      Boundeg Spectrum vs. SSE                Yes          Yes  Yes MOTOR DRIVEN AUXILIARYFEED                          SOUTHWEST CORNER OF THE ROOM, 3 FEET                    Ground Response Spectrum PUMP PP4W EMERGENCY 1 AIR
                                                                                                                                            ~
SOUTHWEST OF THE ROOIIIS ENTRANCE OPERATED LEAKOFF GLOBE                              DOOR VALVE 4      7  2+RV-255      0  AUXILIARYFEEDWATERI EAST            TURBINE  591.00  EMTRDRIVAUXFEEDWIRPMP W THE                633.00                Spectrum vs. SSE      Yos                  Yes MOTOR DRIVEN AVXIUARY                                NORTHWEST CORNER OF THE ROOM. 6 FEET                    Ground Response Spectrum FEEDWATER PUMP PP4E 2 AIR                            NORTHWEST OF EAST MOTOR DRIVEN OPERATED TEST VALVE                                  AUXILIARYFEED PUMP &#xb9;24rPCE. 2 FEET ABOVE 5      7  2+RV-256      0  AUXIUARYFEEDWATER I TURBWE          TURBINE  591.00  TB DRIVEN AUX F DWTR PMP - IN THE          633.00      Bounc4ng Spectrum vs. SSE              Yos                Yes DRIVEN AUXIUARYFEED PUMP PP-                        NORTHWEST CORNER OF THE ROOM, 4 FEET                    Ground Response Spectrum 4 2 AIR OPERATED TEST VALVE                          NORTHWEST OF TURBINE DRIVEN AUXIUARYFEED PUMP &#xb9;2+P-S, NEAR THE FLOOR 6      7    2+RV.257      0  AUXILIARYFEEDWATER I EAST          TURBINE  591.00  E MTR DRIVAUX FEEDWTR PMP IN THE          63300        Bcwndrng Spectrum vs. SSE      Yes    Yes    NIA    Yes  Yos MOTOR DRIVEN AUXILIARY                              NORTHWEST CORNER OF THE ROOM, 6 FEET                    Gnwnd Response Spectrum FEEDWATER PUMP PP4E                                  NORTHWEST OF EAST MOTOR DRIVEN EMERGENCY 1 AIR OPERATED                            AUXIUARYFEED PUMP &#xb9;24'P4E.
LEAKOFF VALVE 7    7    2+RV.258      0  AUXILIARYFEEDWATER I TURBINE        TURBINE  591.00  TB DRIVEN AVXFDWTR PMP W THE                            Bouncang Spectrum vs. SSE      Yes                  Yes DRIVEN AVXIUARYFEED PUMP                            NORTHWEST CORNER OF THE ROOM. NEAR                      Gnwnd Response Spectrum EMERGENCY 1 AIR OPERATED                            THE WEST WAU      6 FEET ABOVE THE LEAKOFF GLOBE VALVE                                  FLOOR 8      7    244 RV-221    0  MAINSTEAM/ STEAM GENERATOR
                                                                                                                                            ~
AUXILIARY 633.00  WMN STM STOP ENCL 5 FEET NORTH OF                      Bouncsng Spectrum vs. SSE      Yos    Yes            Yes  Yes
                              &#xb9;2 STOP VALVEMRV~ STEAM                              MAINSTEAM STOP VALVE&#xb9;244RV.220. ON                      Ground Response Spectrum CYLINDER TRAW 'A'UMP VALVE                          THE 639 ELEVATION P!ATFORM 9      7    244 RV422    0  MAIMSTEAM I STEAM GENERATOR        AUXILIARY 633.00  WMN STM STOP ENCL 4 FEET NORTHEAST        633.00  Yos          Spectnsrr vs. SSE      Yes                  Yes  Yes
                              &#xb9;2 STOP VALVEMRV-220 STEAM                          OF MAINSTEAM STOP VALVE&#xb9;24tMO-220, OM                  Ground Response Spectrum CYUNDER TRAW '8'UMP VALVE                            THE 639 ELEVATIONPLATFORM 10    7    24SRV~        0  MAINSTEAM/ STEAM GENERATOR        AUXILIARY 633.00  W MN STM STOP ENCL - 6 FEET NORTHEAST      633.00      Bounctng Spectrum vs. SSE OME4-2 POWER OPERATED                                                                                                                                              Yes  Yes OF STEAM GENERATOR STOP VALVE&#xb9;244RV-                    Gnwnd Response Spectrum RELIEF VALVE                                        220, ON THE 647 ELEVATIOMPlATFORM 11      7  24jIRV431    0  MAINSTEAM I STEAM GENERATOR        AUXILIARY 633.00  WI4N STM STOP ENCL 3 FEET SOUTH OF        633.00                Spectrum vs. SSE      Yes                        Yos
                              &#xb9;3 STOP VALVEMRV-230 STEAM                          STEAM GENERATOR STOP VALVE&#xb9;24/IRV-230.                  Ground Response Spectrum CYUNDER TRAIN 'A'UMP VALVE                          ON THE 639 ELEVATIONPlATFORM 12      7  24lRV432      0  MAINSTEAM I STEAM GENERATOR        AUXILIARY 633.00  WMN STM STOP ENCL 2 FEET SOUTH 0          633.00  Yes  Boundeg Spectrum vs. SSE        Yes    Yes    NIA    Yos
                              &#xb9;3 STOP VALVEMRV-230 STEAM                          sTEAM GENERAT0R sTop vALYE&#xb9;24rIRv-230,                  Gnwnd Response Spectrum CYLWDER TRAIN '8'UMP VALVE                          OM THE 639 ELEVATIONPLATFORM 13    7                  0  MAINSTEAM I STEAM GENERATOR        AUXILIARY 633.00  W MM STM STOP ENCL -5 FEET NORTHWEST      633.00      Bounding Spectrum vs. SSE      Yes    Yos    NIA        Yos OME44 POWER OPERATED                                OF STEAM GENERATOR STOP VALVE&#xb9;24lRV-                    Ground Response Spectrum RELIEF VALVE                                        230. ON THE 647 ELEVATION PLATFORM Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
1 Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed profession en 'neer.
                                                                                              /I- rs      1)                                                                                  l  /2 Print or T pe Name                                Signature                        Date                    Print or T pe Name                            Signature                  Date
 
Walkdown:              of 11/8193                                                              DCC          NIT2                                                                                Page 2 of 6 SCREENING VERIFICATION DATA SHEET (SVDS)
Item  Eq. CI  Equip.to  Rev    SysuevEquipment Descriptxxt              F Xxx            Room or Row/column No.      No Copscrty vs.          Cop>>  Covests              Equ4r Elev.                                                                Domond Basis          DemondT  GILT                  OK?
14    7    24v-t40.1    0  AVXIUARYFEEDWATER/TURBiNE          TURBNE          TB DRIVEN AVXFDWTR PMP -2 FEET            633.00  Yes  Boundeg Spectrum vs. SSE        Yos    Yes            Yes    Yes DRIVEN AUX FEED PUMP                              SOUTHEAST OF AUXILIARYFEED PUMP                          Grand Rospor>>o Spectrum GOVERNOR OIL COOLER COOUNG                        TURB NE &#xb9;243ME49. NEAR THE SOUTH WATER NLET SAFElY VALVE                            WAlL4 FEET ABOVE THE FLOOR 15      7    24 V.1 40-2  0  AUXIUARYFEEDWATER/TURBINE          TURBINE  591.00 TB DRIVEN AUX FDWTR PMP -2 FEET            633.00  Yes  Bounding Spectrum vs. SSE      Yes                  Yes    Yes DRIVEN AVXFEED PUMP OIL                            SOUTHEAST OF AUXILIARYFEED PUMP                          Ground Respor>>e S pecuum COOLER COOLNG WATER NLET                          TURBINE &#xb9;2OME49. NEAR THE SOUTH SAFElY VALVE                                      WALI 4 FEETABOVE THE FLOOR 16      7    24V-169E      0  AUXILIARYFEEDWATER I EAST          TVRBNE  591.00 E MTR DRIV AUX FEEDWI'R PMP - IN THE      633.00  Yes  Bounding Speal/um vs. SSE      Yes                  Yos    Yes MOTOR DRIVEN AUXILIARY                            MIDDLESOUTH PART OF THE ROOM, NEAR                      Gland  Response Spect/um FEEDWATER PUMP PP4E SUCTION                        THE SOUTH WAU 4 FEET SOUTH OF EAST SAFHY VALVE                                        MOTOR DRIVEN AUXILIARYFEED PUMP 17      7 s  24V-169W          AUXIUARYFEEDWATER I WEST          TURBNE  591.00 WMTR DRIVEN AUX FDWTR PMP NEAR THE        63300  Yes  Boundeg Spectnsn vs. SSE        Yes                          Yes MOTOR DRIVEN AUXIUARYFEED                          CENTER OF THE EAST WALL1 FOOT EAST OF                  Ground Response Spectrum POMP PP4W SUCTION SAFHY                            WEST MOTOR DRIVEN AUXILIARYFEED PUMP VALVE                                              &#xb9;24'P4W. 4 FEET ABOVE THE FLOOR 18      7    24V-1 A-2    0  MAINSTEAM I STEAM GENERATOR      AUXILIARY        WMN STM STOP ENCL-6 FEET WEST OF THE OME4-2 SAFHY VALVE1A 633.00  Yos  Bandeg Spectrum vs. SSE        Yos    Yes            Yos    Yes EASTWALI ON 639 ELEVATIONPLATFORM                        Graund Re        e S 19      7    24V-1 A4      0  MAINSTEAM I STEAM GENERATOR      AUXILIARY        WMN STM STOP ENCL 4 FEET SOUTHEAST        633.00  Yes  Bounding Spectrum vs. SSE      Yos          N/A            Yes OME44 SAFEl Y VALVE1A                              OF STEAM GENERATOR &#xb9;3 STOP VALVE. ON                    Ground Respcese Spectrum 639 ELEVATIONPLATFORM 7    24V-184          MAIMSTEAM I STEAM GENERATOR      AUXILIARY        WMNSTMSTOPENCL NORTHEASTAREAOF 633.00              Yes  Bandeg Spectrum vs. SSE        Yes    Yes            Yos    Yes OME42 SAFHYVALVE18                                THE ROOSL AT 639 ELEVATIONPLATFORM                      Grand Re          S 21      7    24V-184      0  MAN STEAM I STEAM GENERATOR      AUXILIARY        W MN STM STOP ENCI. -6 FEET SOUTHEAST      633.00  Yes  Boundeg Spearum vs. SSE                      N/A OME44 SAFETY VALVE18                              OF STEAM GENERATOR &#xb9;3 STOP VALVE,ON                      Ground Response Speci/um 639 ELEVATIONPLATFORM 22      7    24 V-2A-2    0  MAINSTEAM I STEAM GENERATOR                        WMN STM STOP ENCL-8 FEET SOUTHOF          63300  Yes  Bandeg Spectrum vs. SSE                Yes            Yos OME4-2 SAFHY VALVE2A                                                                                                                                                    Yes THE NORTH WALL639 ELEVATIONPLATFORM                      Graund Re          S 7    2<V-2A4      0  MAINSTEAM/ STEAM GENERATOR        AUXILIARY        W MN STM STOP ENCl. - 5 FEET SOUTH OF      633.00  Yes  Boundeg Spectrum vs. SSE        Yes    Yes            Yes    Yos OME44 SAFETY VALVE2A                              STEAM GENERATOR &#xb9;3 STOP VALVE,ON                        Ground Response Spectrum 639 ELEVATIONPLATFORM 24      7    24V-28-2      0  MANSTEAM I STEAM GENERATOR        AUXILIARY        WMN STM STOP ENCL 8 FEET SOUTH OF          633.00  Yos  Boundeg Spectrum vs. SSE        Yes    Yes    N/A OME4-2 SAFETY VALVE28                                                                                                                                            Yes ~  Yes THE NORTH WALL639 ELEVATION PLATFORM                    Ground Re          S 7    24V-284      0  MAINSTEAM I STEAM GENERATOR      AUXILIARY        WMN STM STOP ENCL-5 FEET SOUTH OF          633.00  Yes  Bandeg Spectrum vs. SSE        Yes                  Yos    Yes OME44 SAFHY VALVE28                                STEAM GENERATOR &#xb9;3 STOP VALVF ON                        Ground Response S pocuum 639 ELEVATIONPLATFORM 26      7    24V4-2      0  MAN STEAM/ STEAM GENERATOR        AVXIUARY        W MN STM STOP ENCL - T FEET NORTH OF      633.00  Yes  Boundeg Spectrum vs. SSE        Yos    Yes                  Yos OME4-2 SAFETY VALVE&#xb9;3                              THE SOUTH WAU AT 639 ELEVATION                          Grand Response Spectrum PLATFORM 27      7    24V44        0  MAtN STEAM I STEAM GENERATOR      AUXILIARY        WMN STM STOP ENCL 6 FEET SOUTHWEST                      Boundeg Spectrum vs. SSE        Yes    Yes            Yes    Yes OME44 SAF HYVALVE&#xb9;3                                OF STEAM GENERATOR &#xb9;3 STOP VALVE,ON                      Ground Response Spec@urn                                        r 639 ELEVATIONPLATFORM 26      7    2-WRV-711    0  ESSENTIAL SERVICEWATER/ESW        AUXILIARY        CTRLRMAIRCONDITRM INTHE                    650.00  N/A  1.5 x Boundeg Spectrum vs.      Yes    Yes                  Yes TO CONTROL ROOM AIR                                NORTHWEST CORNER OF THE ROOI/L 1 FOOT                  Roar>>dc Medion Centered Fker CONDITIONING NORTH UQUID                          EAST OF THE    ROOI/rS ENlRANCE GATE,                        Response Spectre CHILLER CONDENSER CONTROL                          NEAR THE NORTH WAU 5 FEET ABOVE THE VALVE 29      7    2-WRV-712    0  ESSENTIAL SERVICE WATER I ESW    AUXILIARY        CTRL RM AIR CONDIT RM - IN THE                          1.5 x Banda~ Spectnsn vs.      Yes    Yos                  Yes TO CONTROL ROOM AIR                                SOUTHWEST PART OF THE ROOM, ON THE                      ROSMic Mocr>>n Centered Raor CONDITIONING SOUTH LIQUID                          EAST END OF    CONTROL ROOM AIR                              Response Spectre CHILLERCONDENSER CONTROL                          CONDITIONING SOUTH UQUID CHILLER VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed profession I e ineer.)
Print or T pe Name                                Signatur                        Dae                      Printor T pe Name                            Signature                  Date
 
Walkdown:        ... of 11/8/93                                                                DC CO        .slT 2                                                                        v'age3of6 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Ci  Equp.to    Rev      SystemIEqurprnant Dscnpticn              Floor              Rocm or Row/Column            Base              Ce peaty vs.          Cep >  Coveats      lnteroa Equip No.      No                                                Elev.                                            Elev.            Damaxl Basis          Demend7  OK?            OK?  OK?
2-WRV.763    0  ESSENTIAL SERVICE WATER I EAST  SCREENHOUSE 591.00 E ESSNTL SERV WTR PMP RM NORTH OF                      Boundng Spectrum va SSE      Yes    Yos            Yes    Yes ESSENTIAL SERVICE WATER PUMP                        EAST ESSENTIAL SERVICE WATER PUMP &#xb9;2-                  Ground Response Spectrum PP.7E DISCHARGE STRAINER                            Pp-7E WEST BASKET BACKWASH OUTLET SHUTOFF VALVE 31          2.WRV-764    0 ESSENTIAL SERVICE WATER I          SCREENHOUSE 591.00 W ESSNTL SERV WTR PMP RM NORTH OF          633.00  Yes  Bandng Spectnsm vs. SSE      Yes    Yes    NIA    Yes    Yes WEST ESSENTIAL SERVICE WATER                        THE WEST ESSENTIAL SERVICE WATER PUMP                  Ground Response Spectrum PUMP PP-?W DISCHARGE                                <<2'-?W STRAINER WEST BASKET BACKWASHOV1LET SHUTOFF 2-WRV-768    0 ESSENTIAL SERVICE WATER/EAST      SCREENHOUSE 591.00 E ESSNTL SERV WTR PMP RM 3 FEET FROM                    Bandng Spectrum vs. SSE      Yes    Yes            Yes    Yes ESSENTIAL SERVICE WATER PUMP                        THE NORTHWEST CORNER OF EAST                            Ground Response Spectrum PP-7E DISCHARGE STRANER                            ESSENTIAL SERVICE WATER PUMP WEST BASKET BACKWASH NLET                          DISCHARGE STRANER <<2<ME44E SHUTOFF VALVE 2-WRV-769    O'SSENTIAL SERVICE WATER I          SCREENHOUSE 591.00 W ESSNTL SERVWTR PMP RM 3 FEET                          Bandng Spectrum vs. SSE      Yes    Yes          Yes    Yas WEST ESSENTIAL SERVICE WATER                        NORTHWEST OF WEST ESSENTIAL SERVICE                    Ground Response Spectrum PUMP PP-?W DISCHARGE                                WATER PUMP      DISCHARGE STRANER <<2-STRAINER WEST BASKET                                OME44W BACKWASH NLET SHUTOFF VALVE 2.WRV.773    0 ESSENTIAL SERVICE WATER I EAST    SCREENHOUSE 591.00 E ESSNll. SERV WTR PMP RM-3 FEET NORTH                  Boundng Spearum vs. SSE      Yes    Yos            Yes    Yos ESSENTIAL SERVICE WATER PUMP                        OF EAST ESSENllAL SERVICE WATER PUMP                    Ground Response Spectrum PP-?E DISCHARGE STRAINER EAST                      DISCHARGE STRAINER &#xb9;2%ME44E, EVEN BASKET BACKWASH OUTLET                              WITH THE GRATING SHUTOFF VALVE 2-WRV-774    0 ESSENTIAL SERVICE WATER I          SCREENHOUSE 591.00 W ESSNTL SERV WTR PMP RM      N THE                    Boundng Spearum vs. SSE                    NIA            Yes WEST ESSENTIAL SERVICE WATER                        NORTHEAST PART OF THE ROOM, NORTH OF                    Ground Response Spectrum PUMP PP-7W DISCHARGE                                WEST ESSENTUIL SERVICE WATER PUMP &#xb9;2.
STRANER EAST BASKET                                PP-7W BACKWASH OUTLET SHUTOFF VALVE 2-WRV-778    0 ESSENTIAL SERVICE WATER I EAST    SCREENHOUSE 591 00 E ESSNTL  SERVWIR PMP RM NORTH OF        633.00  Yes  Boundng Specvum vs. SSE      Yes          NIA    Yes    Yos ESSENTIAL SERVICE WATER PUMP                        EAST ESSENTIAL SERVICE WATER PUMP <<2-                  Grand Response Spactnsn PP-?E DISCHARGE STRAINER EAST                      PP 7E. 3 FEET NORTH OF THE DUPLEX BASKET BACKWASH INLET                              STRAINER SHUl'OFF VALVE 37          2-WRV-779    0 ESSENTIAL SERVICEWATERI            SCREENHOUSE 591.00 W ESSNTL SERV WTR PMP RM      N THE      633.00  Yes  Boundng Specrnsn vs. SSE      Yes WEST ESSENTIAL SERVICE WATER                        NORTHEAST PART OF THE ROOM, NORTH OF                    Ground Response Spearurn PUMP PP-7W DISCHARGE                                WEST ESSENTIAL SERVICE WATER PUMP &#xb9;2-STRAINER EAST BASKET                                PP 7W BACKWASH NLET SHUTOFF VALVE 24NIO-210    0 CONTAINMENTSPRAY/EAST                          573.00 E CONT SPRAY PMP RM IN THE NORTHWEST                    Bandng Specuum vs. SSE              Yes            Yes CONTAINMENTSPRAY PUMP PP-9E                        PART OF THE ROOM, B FEET NORTHWEST OF                  Grand Response Spectrum 10 MOTOR OPERATED DISCHARGE                        EAST CONTAINMENTSPRAY PUMP <<2+P-9E, SHUTOFF VALVE                                      6 FEET ABOVE THE FLOOR 39          24MO-211      0 CONTANMENT SPRAY I EAST                        573.00 ECONTSPRAYPMPRM IN THE NORTHEND                        Boundng Spectrum vs. SSE CONTANMENTSPRAY PUMP PP4E                          OF THE ROOM, 10 FEET NORTHWEST OF EAST                  Grand Response Spectrum 10 MOTOR OPERATED DISCHARGE                        CONTAINMENTSPRAY PUMP <<2+P4E 6 FEET SHUTOFF VALVE                                      ABOVE THE FLOOR Certification:
Allthe information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed profe sional engineer.)
(II/Ir      6 Print or Type Name                                Si  ature                      Date                    Print or Type Name                          Signature                  Date
 
Walkdown:            df 11/8/93                                                              DC CO        SIT 2                                                                                Page1of6 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Ct  Equp.lo  Rev                                    Busdng. Fker                                            Base                  Capscty vs.            Csp a  Cav&sts Anchor          Eqcsp No. No                                              Eiev.                                          Ekrv.                DemancL Basis          Demand?  OK?    OK?            OK?
24RV410    0 RESIDUAL HEAT REMOVALI EAST        AUXIUARY 6t8.00 E RHR HEAT XCHGR RM IN THE NORTHEAST            N/A    1.5 x Banding Spectrum vs.      Yes                            Y45 RESIDUAL HEAT REMOVALHEAT                        CORNER OF THE ROOM, 5 FEET FROM EAST                  Realssc Mecssn Centeral Fker                                        r EXCHANGER HE-17E 8 AIR                            RESIDUAL HEAT REMOVALHEAT EXCHANGER                          Response Spectra OPERATED OUTLET FLOW                              &#xb9;24IE-17E. 2 FEET ABOVE CONTROL VALVE 24RVQ11    0 RESIDUAL HEAT REMOVALI            AUXILIARY 609.00 E RHR HEAT XCHGR RM IN THE NORTHWEST                    1.5 x Boundng Spectrum va      Yes            NIA      Yes RESIDUAL HEAT REMOVALHEAT                        CORNER OF THE ROOM, 5 FEET NORTHWEST                  ROSLsdc  Mafisn Centered F ker EXCHANGERS BYPASS FLOW 8                          OF EAST RESIDUAL HEAT REMOVALHEAT                            Response Spectra AIR OPERATED CONTROL VALVE                        EXCHANGER &#xb9;24IE-I 7E. 5 FEET 0 RESIDUAL HEAT REMOVALI WEST        AUXILIARY et8.00 W RHR HEAT XCHGR RM - IN THE NORTHEAST                  1.5 x Boundng Spectrum vs.      Yes    Y45    N/A            Yes REStDUAL HEAT REMOVALNEAT                        REGION OF THE ROOM, 8 FEET NORTHEAST                  Rearisdc Mafisn Centered Fker EXCHANGER HE-17W8 AIR                            OF WEST RESIDUAL HEAT ROMOVALHEAT                            Response Spectra OPERATED OUTLET FLOW                              EXCHANGER &#xb9;24IE-17W, NEAR CONTROL VALVE 24IRV-211    0 MAW STEAM I STEAM GENERATOR        AUXILIARY 633.00 E MAINSTM STOP ENCL 3 FEET NORTH OF                      1.5 x Boundng Spectrum vs.      Yes    Yes            Yes    Yos
                              &#xb9;1 STOP VALVEMRV-21 0 STEAM                      STEAM GENERATOR STOP VALVE&#xb9;24IRV-210,                  Rea(sdc Marian Centaed Fker CYUNDER TRAIN'A'UMP VALVE                        ON THE 639 ELEVATIONPlATFORM                                  Ro        S 24IRV-212    0 MAINSTEAM/Sl'EAMGENERATOR          AUXILIARY 633.00 E MAINSTM STOP ENCL 3 FEET NORTHWEST            N/A    1.5 x Bourxfng Speci/um vs. Yes    Yes    N/A      Y4$    Y4$
                              &#xb9;1 STOP VALVEMRV-210 STEAM                        OF STEAM GENERATOR STOP VALVE&#xb9;24IRV-                  Reasstic Mafisn Centered Fker CYLINDER TRAINTf DUMP VALVE                      210. ON THE 640 ELEVATION PlATFORM                            Ro        S ctra 24IRV-213    0 MAINSTEAM I STEAM GENERATOR        AUXILIARY 633.00 E MAN STM STOP EMCL N THE NORTHWEST                      1.5 x Boundng Spectrum va      Yes                            Y45 OMM-1 POWER OPERATED                              REGION OF THE ROOM, 3 FEET SOUTHWEST                  Realsdc MaEsn Centered Fker REUEF VALVE                                      OF    STEAM GENERATOR STOP VALVE&#xb9;2-                          Response Spectra MRV.210. OM THE 640 ELEVATION 24IRV.241    0  MAINSTEAM I STEAM GENERATOR      AUXIUARY  633.00 E MAW STM STOP ENCL IN THE SOUTHWEST                    1.5 x Bcundng Spectrum vs.      Yes    Yes            Yos    Yos
                              &#xb9;4 STOP VALVEMRV-240 STEAM                        PART OF THE ROOM. 3 FEET SOUTH OF                      ROSLsuc Median Centered  Fker CYLINDERTRAIN'A'UMPVALVE                          STEAM GENERATOR STOP VALVE&#xb9;24IRV                              Response Spectra 240. AT THE 640 ELEVATION 24IRV-242    0  MAINSTEAM I STEAM GENERATOR      AUXILIARY 633.00 E MAN STM STOP ENCL N THE SOUTHWEST                      1.5 x Boundng Spectrum vs.      Yes    Yes            Yos    Yes
                              &#xb9;4 STOP VALVEMRV-240 STEAM                        PART OF THE ROOM. 2 FEET SOUTH OF                      Realssc Mafsrn Centered Fker CYUNDER TRAIN'Lr DUMP VALVE                      STEAM GENERATOR STOP VALVE&#xb9;24IRV                              Response Spectra 240. AT THE 640 ELEVATION 24IRV.243    0  MAINSTEAM I STEAM GENERATOR                633.00 E MAW STM STOP ENCL N THE SOUTHWEST                      1.5 x Boundng Spectrum vs.      Yos    Y4$    NIA            Yes OME~ POWER OPERATED                              REGION OF THE ROOM, 2 FEET WEST OF                    Roalssc Median Centered Fker REUEF VALVE                                      STEAM GENERATOR STOP VALVE&#xb9;24IRV-                            Response Spectra 240. AT THE 640 ELEVATION 10          2&RV~        0  BORON MAKEUP (CVCS) I SOUTH                609.00 Vot. CTRL TANKE HALLWAY IN THE MIDDLE            N/A    1.5 x Bourx4ng Spectnsn va      Yes    Yos    N/A      Yos    Y4$
BORIC ACID BLENDER QP41 2 AIR                    WEST REGION OF THE HALLWAY,NEAR THE                    Reassdc Marian Centered Fker OPERATED TO CVCS CHARGWG                          WEST    WAU3 FEET ABOVETHE FLOOR                            Response Spectra PUMPS SUCTION SHUTOFF VALVE 2&RV<51      0  BORON MAKEUP (CVCS) I SOUTH                609.00 VOL CTRL TANKE HALLWAY ON THE 618                        1.5 x Boundng Spectnm va        Yes            NIA      Yes BORIC ACID BLENDER QP41 To                        ELEVATIONPLATFORM, 20 FEET NORTH OF                    Roassdc Median Centered Boor REACTOR CoolAMT LEIDOWM                          THE ACCESS LADDER, OM THE WEST WALL                          Response Spectra VOLUME CONTROL TANKSHUTOFF VALVE 12          24V 104E    0  RESIDUAL HEAT REMOVALI EAST                609.00 E RHR HEAT XCHGR RM W SOUTHEAST                  NIA    1.5 x Boundng Spectrum vs.      Yos    Yes                    Y45 RESIDUAL HEAT REMOVALHEAT                        CORNER. 1 FOOT ABOVE DECK GRATING                      Realsdc Mecgsn Centered Fker EXCHANGER HE-17E OUTLET                                                                                        Response Spectra SAFElY VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
d2.                      /2 II'6 /9S                                                                                            /~//q    15.
Print or T pe Name                              Si nature                        Date                Print or T pe Name                                                            Date
 
Walkdown:            ~f 11/8/93                                                              DC CO          .IT 2                                                                              .'age2of6 SCREENING VERIFICA                DATA SHEET (SVDS)
Eq. CI  Equp.to  Rev                                    Buadrtg.                    Room or Row/Coksrtn              Base No.      No                                                                                                                                              Cap >  Cavaats                Equp Bev.                                        Demand?  OK7    OK?            OK7 13    7    24V-104W    0  RESIDUAL HEAT REMOVALI WEST      AUXIUARY  609.00 W RHR HEAT XCHGR RM N THE SOUTHEAST                      1.5 x Boundtng Specuum vs.              Yes          Yes      Yes RESIDUAL HEAT REMOVALHEAT                          REGION OF THE ROOM, 3 FEET SOUTH OF                      Resssdc Median Centered Fker EXCHANGER HE-17W OUTLET                            WEST RHR HTX &#xb9;24IE-17W                                          Response Spectra SAFHY VALVE 14      7    24V-14E    0  ESSENTIAL SERVICE WATER I EAST              609.00 E CONT SPRAY HEAT XCHGR RM - AT THE TOP                  1.5 x Boundtng Spectrum vs.      Yas                  Yes      Yss CONTAINMENTSPRAY HEAT                              OF THE EAST CONTAtNMENTSPRAY HEAT                        Realsdc Median Centered Fker EXCHANGER HE-18E SHELL SIDE                        EXCHANGER, ON THE EAST WALL                                    Response Spectra SAFHY VALVE 15      7    24V-1 4W    0  ESSENTIAL SERVICE WATER I        AUXILIARY 609.00 W CONT SPRAY HEAT XCHGR RM - WEST SIDE              NIA  1.5 x Boundstg Spectrum vs.      Yes                  Yes      Yes WEST CONTAINMENTSPRAY HEAT                        OF THE WEST CONTAINMENTSPRAY HEAT                        Reassdc Median Centered Fker EXCHANGER HE-1 BW SHELL SIDE                      EXCHANGER. 2 FEET BELOW THE CEILING                            Response Spectra SAFHY VALVE 16      7    24V-15E    0  ESSENTIAL SERVICE WATER I EAST              609.00 609 HALLWAY- ON THE SOUTHEAST END OF                NIA  1.5 x Boundtng Spectnsn vs.              Yes                    YO$
COMPONENT COOUNG WATER                            UNIT 2 EAST CCW HEAT EXCHANGER                          Resssdc Median Canlerad Roor HEAT EXCHANGER HE-15E TUBE                                                                                        Response Spectra SIDE SAFHY VALVE 17      7    24V-15W      0  ESSENTIAL SERVICE WATER I                  609.00 609 HALLWAY-ATTHE SOUTH END OF UNIT 2              WA    14 x Boundrttg Specuum va                              Yss      Yes WEST COMPONENT COOUNG                              WEST CCW HEAT EXCHANGER                                  Raarrssc M<<san Cantered Rcor WATER HEAT EXCHANGER HE-1 SW                                                                                      Response Spectra TUBE SIDE SAFElY VALVE 18      7    2$ V-IA-1    0. MAN STEAM I STEAM GENERATOR                633.00 E MAN STM STOP ENCL 4 FEET NORTHWEST                      1.5 x Botmdstg  Spectnsn vs. Yas    Yes  WA              Yss OME4-1 SAFElY VALVE1A                              OF STEAM GENERATOR &#xb9;1 STOP VALVE.ON                      ROOMc Median    Cantered Roar 639 ELEVATIOMPLATFORM                                          Rs        S      a 19      7    24V-1A4      0  MAIN STEAM I STEAM GENERATOR                633.00 E MAN STM STOP ENCL - SOUTHWEST PART                      1.5 x Boundrtg  Specuum va,                    NIA    Yes      Yes OME44 SAFElY VALVE&#xb9;1A                              OF THE ROOM, AT 639 ELEVATIOMPLATFORM                    Rearstic Median  centered Boor Res      S      a 7    24V.1 8-1    0  MAINSTEAM I STEAM GENERATOR                633.00 E MAINSTM STOP ENCL 5 FEET NORTH OF                N/A  1.5 x Boundtng  Spectrum va      Yes    Yas          Yes      Yes OME4-1 SAFElY VALVE1B                              STEAM GENERATOR &#xb9;1 STOP VALVE, OM                        ROSMc Median    Centered Fker 639 ELEVATIOMPLATFORM 21      7    24V-I  ~    0  MAINSTEAM I STEAM GENERATOR OME~ SAFETY VALVE1B AUXILIARY 633.00 E MAIN STM STOP ENCL SOUTHWEST PART Re 1.5 x Boundstg S      a Spectnsn vs. Yes OF THE ROOM, AT 639 ELEVATIOMPLATFORM                    Rearrsdc Median  Centered Fker Response        a 7    24V-2A-I    0  MAINSTEAM I STEAM GENERATOR      AUXILIARY 633.00 EMAINSTMSTOPENCL SFEETNORTHOF                            1.5 x Boundstg  Spectrum vs. Yes    Yes          Yas OME4-1 SAFElY VALVE2A                              STEAM GENERATOR &#xb9;1 STOP VALVE, ON                        Raalsdc M<<ssn Centered    Fker 639 ELEVATIONPLATFORM                                          R        6 7    24V-2A4      0  MAtM STEAM I STEAM GENERATOR                633.00 E MAN STM STOP ENCl. MIDDLEWEST PART                      1.5 x Boundrtg Spectrum  vs. Yes    Yes          Yes  .,  Yes OME44 SAFHY VALVE2A                                OF THE ROOM, AT 639 ELEVATION PLATFORM                  Raarrsdc Median Centered  Fker R        Spectra 24      7    24V-28-1    0  MAN STEAM I STEAM GENERATOR                633.00 E MAN STM STOP ENCL -5 FEET NORTHEAST                    1.5 x Boundstg Spectnsn  va              Yes  WA OME4.1 SAFHY VALVE2B                              OF STEAM GENERATOR    &#xb9;I STOP VALVE. ON                  ROSMc Median Cantered    Fker 639 ELEVATIOMPLATFORM                                          Response Spectra 7    24V-2&4      0  MAN STEAM I STEAM GENERATOR                633.00 E MAN STM STOP ENCL - MIDDLEWEST PART                    1.5 x Bound tng Spectnsn va              Yes          Yes      Yes OME44 SAFEIY VALVE2B                              OF lHE ROOHL AT 639 ELEVATIOMPLATFORM                    Raalrssc Median Centered  Roor R                a 7    24V4.1      0  MAINSTEAM I STEAM GENERATOR                SLk00  E MAN STM STOP ENCL 6 F EET NORTHEAST                    1.5 x Boundstg Spectrum  vs.                                    Yas OME4-1 SAFEIY VALVE&#xb9;3                              OF STEAM GENERATOR &#xb9;1 STOP VALVE. ON                    Reassdc M<<fun Centered    Floor 839 ELEVATIONPLATFORM                                          R        Spectra 27      7    24V4-4      0  MAINSTEAM I STEAM GENERATOR                633.00 E MAN STM STOP ENCL - MIDDLEWEST PART                    1.5 x Boundstg Spectrum  va      Yes    YO$          Yes OME44 SAF HYVALVE&#xb9;3                                OF THE RoohL AT 639 ELEVATIONPLATFORM                    ROSMc Meccan Centered    Rcor Res    ss      a Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
iz/~< lj g                                                                                          Jz I Print or T pe Name                                Si nature                        Date                    Print or T pe Name                                n    re                Date
 
Walkdown:            . of 111N93                                                            DC CO          .<IT 2                                                                              Page 3 of 6 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl  E<FSP.ID          System/Equipment scnpticn                                  Rocm or Row/Column                                                                                        E<asp No.
OK7          OK7 26            2~44        0  REACTOR COOLANT PUMP SEAL      AUXILIARY  609.00 SEAL WIR HEAT XCHGR RM NORTHEAST                    NIA  1.S x Boundng S pact/urn vs. Yas    Yes    NIA    Yes    Yes WATER INJ/LEAKOFF I REACTOR                      AREA OF THE ROOM                                        ROSSsdc Macron Centered  Fker COOLANT PUMP SEAL WATER                                                                                          Response Spectra HEAT EXCHANGER HE-11 SAFETY VALVE 2~48-15      0  CCWI RCP SEAL WATER HEAT        AUXILIARY  609.00 609 HALLWAY-ONTHE SOUTHEAST WAU                    NIA  1.5 x Boundag Spectnsn vs.              Yos                  Yesr EXCHANGER HE 11 CCW OUTLET                      SOUTH OF VOLUME CONTROL TANK                            ROSSsdc Mocrian Centered  Reer SAFETY VALVE                                      REMOVABLEWALL.7 FEET ABOVE THE FLOOR                            Ras      S 2<V-71      0  CCWI SOUTH SPENT FUEL PIT      AUXILIARY  609.00 SPENT FUEL PIT HEAT XCHGR RM - IN THE                    1.5 x Bou/Xkng Spect/um vs,            Yes          Yes    Yes HEAT EXCHANGER 124IE-16S CCW                      SOUTHERN REGION OF THE ROOM, NEAR THE                    ROOSsdc  Mafisn Cantered Roor OUTLET SAFETY VALVE                              EAST END OF THE SOUTH SPENT FUEL PIT                            Response Spectra HEAT EXCHANGER. 12 FEET ABOVE THE FLOOR 31                        0  COMPONENT COOUNG WATER I        AUXILIARY  609.00 609 HALLWAY 25 FEET EAST OF THE                          1.5 x Boundeg Spect/um vs.              Yes                  Yes EAST RESIDUAL HEAT REMOVAL                        PASSENGER ELEVATOR DOORWAY, 18 FEET                      ROSSstic Median Centered  Boor HEAT EXCHANGER HE-17E                            ABOVE THE FLOOR                                                Response Spectra COMPONENT COOLING WATER OUTLET SAFETY VALVE 2<v-97      0  BORON NJECTION I BORON          AUXILIARY  612.00 BORON INI TANKRM - EAST OF THE TANK, ON                  Ih x Bou/xsrg Speci/um vs.              Yes    WA      Yas    Yes NJECTION TANK1K-11 OU1LET                        THE WALL                                                Reatsdc Meccan Centered Fker
                            ~ SAFETY VALVE                                                                                                      Res      S      a 2CMO410      0  COMPONENT COOUNG WATER I        AUXILIARY  609.00 609 HALLWAY 10 FEET SOUTH OF THE                          1.5 x Basxsng Speci/urn vs.            Yes                  Yes EAST COMPONENT COOUNG                            NORTH END OF EAST COMPONENT COOUNG                      ROOSsdc Median Centered Fker WATER HEAT EXCHANGER HE.1 SE                      WATER HEAT EXCHANGER &#xb9;24IE-1 SE, ON THE                        Response Spectra COMPONENT COOLING WATER                          EAST SIDE.
OUTLET SHUTOFF VALVE 2CMO411      0  COMPONENT COOLING WATER I      AUXILIARY  609.00 609 HALLWAY- 8 FEET SOUTHWEST OF EAST                    1.5 x Bandog Spectrum vs.      Yes    Yes            Yes    Yas COMPONENT COOLING WATER                          CCWPUMP &#xb9;24'P-IOE. 8FEETABOVE THE                        Realistic MotSsn Centered Roor PUMPS SUCTION CROSSTIE TRAIN                      FLOOR ON THE 614 ELEVATIONPLATFORM                              Response Spectra
                              'A'HUTOFF VALVE 2<MD<12      0  COMPONENT COOLING WATER I      AVXIUARY  609.00 609 HALLWAY- 10 FEET SOUTHWEST OF                  N/A  1.5 x Bouodeg Spectrum  va            Yas    N/A            Yes COMPONENT COOUNG WATER                            CVCS MONITOR TANK&#xb9;12 TK-I44, 5 FEET                      Resrrsdc Median Centered  Fker PUMPS DISCHARGE CROSSTIE                          NORTH OF THE SOUTH WAU 2 FEET ABOVE                            Response Spectra TRAIN 'A'HUTOFF VALVE                            THE FLOOR 24;MD<13      0  COMPONENT COOUNG WATER I        AUXILIARY  609.00 609 HALLWAY-4 FEET SOUTH OF WEST CGW                      1.5 x Boundng Spect/um vs.              Yes                  Yet COMPONENT COOUNG WATER                            PUMP &#xb9;24'P-IOW, 8 FEET ABOVE THE                        Reassdc Matfisn Centered Roar PUMPS SUCTION CROSSTIE TRAIN                      FLOOR ON A PLATFORM                                            Response Spectra
                              '8'HUTOFF VALVE 37          24:MO414      0  COMPONENT COOUNG WATER I COMPONENT COOUNG WATER AUXIUARY  609.00 609 HALLWAY 8 FEET SOUTHWEST OF GVCS MONITOR TANK&#xb9;12-TK-144, 5 FEET NORTH NIA  1.5 x Boundng Spectnnl ROOSssc Marrisn Cantered va Fker Yes    WA  'es PUMPS DISCHARGE CROSSTIE                          OF THE SOUTH WALL2 FEET ABOVE THE                              Response Speci/a TRAN Ir SHUl'OFF VALVE                            FLOOR 2~0415        0  COMPONENT COOUNG WATER I        AUXILIARY 609.00 609 HALLWAY 2 FEET WEST OF EAST                    NIA  1.5 x Bcurxkng Spoct/le  va    Yes    Yes            Yes    Yes COMPONENT COOLING WATER To                        COMPONENT COOUNG WATER HEAT                              Resrrsbc Mecssn Centered  Fker MISCELLANEOUS SERVICE TRAN                        EXCHANGER &#xb9;24IE 15E. 3 FEET ABOVE THE                            Response Spectra
                              'A'HUTOFF VALVE                                  FLOOR 39          24:MO416      0  COMPONENT GOOUNG WATER I                  609.00 609 HALLWAY- 15 FEET SOUTH OF NORTH                      1.5 x Boundng Spectrum vs.              Yes            Yos    Yes COW TO MISCELLANEOUS                            END OF EAST CCW HEAT EXCHANGER &#xb9;24IE-                    Rearrsdc Me&an Centered Fker SERNCE HEADER'Ir 16 MOTOR                        15E, ON WEST SIDE                                                Response Spears OPERATED SHUTOFF VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Z // A//9s-                                                                            ILIA/N.~
Print or T pe Name                              Si nature                        Date                    Print or T pe Name                                i  ture                    ate
 
      ~ ~                                                                                                                                                                                                                                . ~ ~ ~
                                                          ~ ~                                    ~ '  ~, ~ '                ~
l8i558    ~ 1
                                                                                                                                                                                                                          %8iEQR%li&ilE9
                                                                                                                                        ~  '  ~ ~
                                    ~ '                    ~ ~                                                ~ ~
                ~      ~                                ~ ~                                    ~ ~  ~ ~                                                                          at'        I
                                          ~      ~                  ~ ~
                                                                                                                            ~  ~
                                    ~  ~                  ~ ~
t~                                                        ~ ~        ~      ~ I'      ~
                                                                                                                    ~            L    ~                ~ ~
                                                                                                                                                            ~ ~  '
                                            ~  '                        ~    ~
                                                    ~            ~
                                                                                                      ~  I                  ~
                                                                                                                                '                                ~  I      ~          ~  '    I
                                      ~ '                                                                                        ~          '    ~
                                                                                                                                                              ~ ~    '
                                                              ~      ~
                                    ~ ~ '                      1      ~
0~                                                                          ~ ~  '    ~
                                                    ~      ~      ~            ~
                                    ~    ~
                                                                                                      ~ I                                                                          ~ ~
                                                                                                                                                                                          '    ~
                                    ~ ~ '                                                                                    ~      ~              ~ ~
                                                                                                                                                                  ~ ~
                                                                      ~
                                          ~  ~      ~    '                ~        ~
PP5$ 1".                                                                                                                    ~ ~
                                                                                                                                                    ~ ~
WII-WPSWP                                                                                                                      ~  ~
                                                                                                                                                        ~ ~
WP IRWIN.'INS.                                                                                                                                                                        Wll
                                                                                                                  ~  ~            ~ ~                      0            ~
85 WR-1lPW5
                                                                                                                                                          ~            ~
                                                                                                                                                                    ~  ~
PP811                              ".                                                    SWIFT'::
                                                                                                                                                          ~            ~
l55
          ~      ~      LO                                                                ~ ~                  ~    ' '              ~          ~
                                                                                                                                                            '    ~          ~ ~              ae    '      ~ . ~ ~  ~            ~ ~
                  ~  ~  ~                      ~  '          .      ~    ~
  ~  t  ~      ~    .
                            '                                                      ~
                                                                                        '                                                                                        ~    ~    ~                      ~  ~  ~ ~ . ~
    ~  L~  ~        ~        ~              ~        ~    ~                      ~  O ~
L      L  ~                                                                                                                                            L          'l    . I  I lll
                ~        ~                                                                                              ~ .
 
Walkdown:          4 of 11/8/93                                                                              DC C          .IT 2                                                                                      'age50f6 SCREENING VERIFICAli          N DATA SHEET (SVDS)
Fkxx              Room of Row/Couann                                                            Cap >  Caveats                    Equip Equp.lo                                                                                                                                                                                                            OK?
Eurv.                                                                                          Demand?    OK?      OK?
No.
N/A    1.5 x Boundng Spectnan vs.        Yes              NIA      Yes 24M 0412    0  RESIDUAL HEAT REMOVALI EAST                    AVXII.IARY          E RHR HEATXCHGR RM 5 FEET NORTHEAST      609.00 RESIDUAL HEAT REMOVALHEAT                                          OF EAST RHR HEAT EXCHANGER &#xb9;24IE-17E,                  ReaMc Median Centered Fker EXCHANGER HE-1 7E OUTLET MINI-                                      NEAR THE EAST WALL                                              Response Spears FLOW UNE SHUTOFF VALVE E RHR HEAT XCHGR RM - 5 FEET NORTH OF                    1.5 x Boundatg 6 pecuum vs.      Yes      Yes              Yes      Yes 2-IMMI 4    0  RESIDUAL HEAT REMOVALI EAST                    AUXILIARY RES KIUALHEAT REMOVALPUMP                                          EAST RHR HEAT EXCHANGER &#xb9;24IE-I?E,                      ReaMc      MetSan Centered Fkgr PP45E DISCHARGE CROSSTIE                                            AGANST THE NORTH WAU AT THE 615                                Response Spears SHUTOFF VAI.VE                                                      ELEVATIOMPLATFORM GRATING 1$ x Bounds Spectrum vs.                                              Ye>>
0  RESIDUAL HEAT REMOVALI WEST                    AUXIUARY            W RHR HEAT XCHGR RM IN THE EAST RESIDUAL HEAT REMOVALHEAT                                          CORNER OF THE ROOM, AGAINSTTHE WALL,                    ReaSstic Median Centered Fker EXCHANGER HE.17W OUTLET MINI-                                      5 FEET EAST OF WEST RHR HEAT                                    Response Spectra FLOW LINE SHUTOFF VALVE                                            EXCHANGER &#xb9;24IE-1 7W W RHR HEAT XCHGR RM - 6 FEET NORTH OF                    1.5 x Boundng Speanan vs.                                    Yes      Yes 24M 0424        RESIDUAL HEAT REMOVALI WEST RESIDUAL HEAT REMOVALPUMP                                          WEST RHR HEAT EXCHANGER &#xb9;2+E-t?W,                      ReaMc Median Centered Fker PP45W DISCHARGE CROSSTIE                                            AGAINST THE NORTH WALIATTHE 615                                Response Spectra SHUTOFF VALVE                                                      PLATFORM GRATNG N/A    1.5 x Bourxung Spectrum vL                          N/A      Yes      Yes 0  RESIDUAL HEAT REMOVALI EAST                                        E RHR HEAT XCHGR RM IN THE SOUTHEAST      609.00 RESIDUAL HEAT REMOVALTo                                            CORNER OF THE ROOM. 5 FEET SOUIHEAST                    ReaMc Median Centered Fker UPPER CONTAINMENTSPRAY                                              OF EAST RHR HEAT EXCHANGER &#xb9;24IE-1?E                            Response Speara SHUTOFF VALVE 57      8    24M 0431    0  RESIDUAL HEAT REMOVALI WEST                    AUXILIARY          W RHR HEAT XCHGR RM IN THE SOUTHEAST      609.00  N/A    1.5 x Boundatg S pact/um vs.
RHR TO UPPER CONTAINMENT                                            CORNER OF THE ROOM. 6 FEET SOUTHEAST                    ReaMc MaSm Centered Boor SPRAY SHUTOFF VALVE                                                OF    WEST RHR HEAT EXCHANGER &#xb9;24IE-                            Response Spectra 17W. NEAR THE EAST WALL 1.5 x Bourxang Spectrum va                                            Yes 0  RESIDUAL HEAT REMOVALI EAST                    AUXILIARY          ERHRHEATXCHGRRM 6FEETNORTHOF RESIDUAL HEAT REMOVALHEAT                                          EAST HEAT EXCHANGER &#xb9;244E-1 ?E, AT THE                  ReaMO MaSan Centered Fkcr EXCHANGER TO CHARGNG                                                PLATFORM GRATING                                                Response Spectra PUMPS SUCTION SHUTOFF VALVE N THE SOUTHWEST  609.00  N/A    1.5 X Bcundrng SPeCuum VS.                                  Yes      Yes 0  RESIDUAL HEAT REMOVALI WEST                    AUXILIARY          W RHR HEAT XCHGR RM RHR HEAT EXCHANGER OUTLET                                          CORNER OF THE ROOM, 5 FEET SOUTHWEST                    ReaMc    MecSan Cenlered Fkor TO SAFHY IRlEClloMPUMP                                              OF WEST RHR HEAT EXCHANGER &#xb9;24IE-                              Response Spectra SUCTION SHUTOFF VALVE                                              17W. NEAR THE WEST WAlL 1.5 x Boundng Specuum vs.        Yes      Yes      N/A      Yes      Yes 244MO-210    0  MAIN STEAM I STEAM STOP VALVE                  AUXILIARY            E MAINSTM STOP ENCL 3 FEET NORTH OF MRV-210 STEAM CYLINDER DUMP 4                                      STEAM STOP VALVE&#xb9;24/IRV-210, ON 639                    ReaSsdc Mtxfran Centered  Fkor MOTOR OPERATED VALVES                                              ELEVATION PlATFORM                                              Response Spectra SELECTOR VALVE 61      8    244M 0-240  0  MAN STEAM I STEAM STOP VALVE                                        E MAINSTM STOP  ENCL - IN THE MIDDLE                      1.5 x Boundng Specuum vs.                                    Yes      Yes MRV-240 STEAM CYUNDER DUMP                                          SOUTH PART OF THE ROOM, AT THE 640                      ReaMc Median Centered Fker VALVE4 MOTOR OPERATED                                              ELEVATION PLATFORM. 1 FOOT ABOVE THE                            Response Spectra SELECTOR VALVE                                                      GRATNG 24)M0451    0  LETDOWN(CVCS)/REACTOR                                              VOL CTRL TANKE HALLWAY ON THE WEST                        th x Bounding Specuum    vs.                                Yes      Yds COOLANT LETDOWN VOLUME                                              WALL,AT THE NORTH END OF THE HALLWAY,                  ReaSsdc Metfran Centered  Fkor CONTROL TANKTK-10 To CVCS                                          NORTHEAST OF VOLUME CONTROL TANK&#xb9;2-                              Response Spectra 2AM~          0 CHARGING PUMPS TRAN VALVE 4 MOTOR OPERATED LETDOWN (CVCS) I REACTOR COO(ANT LETDOWN VOLUME CONTROL TANKTK-1 0 TO GVCS
                                                                'A'HUTOFF AUXILIARY TK-10 VOL CTRL TANKE HALLWAY 6 FEET EAST OF VOLUMECONTROL TANK&#xb9;2-TK-1 0. NEAR THE WEST WAU4 FEET ABOVE THE FLOOR 609.00  N/A    1.5 x ~        Spectrum vs.
ReaMc Median Centered Floor Response Spears Yes                        Yes      Yes CHARGNG PUMPS    TRANS'HUTOFF 4 MOTOR OPERATED VALVE Certification:
                                                                                                                                                                          "All information" includes each entry and conclusion All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate.
(whether verified to be seismically adequate or not).
entries Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the and condusions. One signatory      should  be      a    licensed    professional engineer.)
12/Ir 6 /yS-                                                                                                IZ    l9      C Printor T pe Name                                              Si nature                          Date                    Print or T pe Name                                      ture                      Date
 
Walkdown:            . of t1/N93                                                              DC CO        .4IT 2                                                                                roage 6 of 6 SCREENING VERIFICATION DATA SHEET (SVDS) sam    Eq. CI  Equip.lo    Rev    System/Equipmant Dascnptton    au/tdeg. Fker              Room or Row/Coktmn            Bass                  Capacay vs.            Cap >  Caveats Anchor tnteact Equp No.      No                                              Elev.                                            Elev.              DemarxL Basis            Dam ex!?  OK?    OlQ    OIC?  OK?
2-V/MO-      0  ESSENTIAL SERVICE WATER I EAST    AUXILIARY 609.00 609 HALLWAY- 3 FEET EAST OF UNIT 2 EAST                  1.5 x Botstdstg Spectrum vs.              Yas            Yas    Yas 714          CONTAINMENTSPRAY HEAT                              AND WEST CONTAINMENT SPRAY HEAT                        ROOMc Mefmn Centered Fker EXCHANGER HE-1 BE ESSENTIAL                        EXCHANGER ROOM DOORWAY, OM THE                                Response Spsctnl SERVICE WATER OUTLET SHUTOFF                      SOUTHEAST CORNER OF THE VALVE 2.WMO        0  ESSENTIAL SERVICE WATER/          AUXILIARY 609.00 609 HALLWAY 30 FEET EAST OF THE            609.00  N/A  1.5 x Boundvtg Spectrum vs.        Yes    Yes    N/A    Yes    Yes 718          WEST CONTAINMENTSPRAY HEAT                        PASSENGER ELEVATOR. OM THE 621                          Resttssc Median Centered Floor EXCHANGER ESSENTIAL SERVICE                        ELEVATIOMPLATFORM. NEAR THE SOUTH                              Response Spectra WATER OUTLET SHUTOFF VALVE                        WALL 2-WMO        0  ESSENTIAL SERVICF WATER I EAST    AUXILIARY 609.00 609 HALLWAY- AT THE NORTH END OF EAST                    1.5 x Boundstg Spectrum va                        N/A            Yes 732          COMPONENT COOUNG WATER                            COW HEAT EXCHANGER &#xb9;24IE-I SE. 10 FEET                  Rearsuc Nledian Centered Floor HEAT EXCHANGER HE-1 SE                            ABOVE THE FLOOR                                                Raspcnse Spectra ESSENTIAL SERVICE WATER INLET SHUTOFF VALVE 67      8    2-WMO.          ESSENTIAL SERVICE WATER I EAST                    609 HALLWAY AT THE NORTH END OF 2 EAST                  1.5 x Boundtng Spectrum vk        Yes                    Yas    Yes 734          COMPONENT COOUNG WATER                            COW HEAT EXCHANGER &#xb9;2+E-I SE, 8 FEET                    Rea5suc Meftan Cantered Floor                                        4 HEAT EXCHANGER HE-I SE                            ABOVE THE FLOOR                                                Response Spectra ESSENTIAL SERVICE WATER OUTLET SHUTOFF VALVE 68      8    2-vvM0      0  ESSENTIAL SERVICE WATER I        AUXILIARY 609.00 609 HALLWAY- ABOVE THE NORTH END OF                      1.5 x Boundstg Speci/um ve        Yas    Yas 736          WEST COMPONENT COOLING                            WEST CCW HEAT EXCHANGER &#xb9;2+!E-I SW, 7                  ROOTstic Meftan Cenlered Fkcr WATER HEAT EXCHANGER                              FEET ABOVE THE FLOOR                                          Response Speci/a ESSENTIAL SEIMCE WATER NLET SHUTOFF VALVE 2-WMO-      0  ESSENTIAL SERVICE WATER I        AUXILIARY 609.00 609 HALLWAY I Fool'ABOVE THE NORTH                      1.5 x Bourxhng Spectnsn vs.                              Yes    Yas 738          WEST COMPONENT COOLNG                              END OF WEST CCW HEAT EXCHANGER &#xb9;2+IE-                  Rearrssc Median Cantered Boor WATER HEAT EXCHANGER                              I SW, 6 FEET ABOVE THE FLOOR                                  Response Spectra ESSENllAL SERVICE WATER OUTLET SHUTOFF VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
1 Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                                Si nature                        Date                  Print or T pe Name                              Si  a  re                  Date
 
Walkdown:              of 11I6193                                                          DC CO          tlT 2                                                                              r'age 4  Of 6 SCREENING VERIFICATION DATA SHEET (SVDS) item  Eq. CI  Equp.to    Rev      System/Equipment DescnpUon            Floor            Room or Row/Cotumn              Base                Capacrty vs.          Cap>    Caveats      utteract Eqtsp No.      No                                            Elev.                                              Eurv.              Demand Basis          Dam and7  OK7          OK7      OK7 8    24M O-212    0  CONTAINMENTSPRAY I EAST        AUXILIARY 573.00 E CONT SPRAY PMP  RM - N THE MIDDLE                      Boundng Spectnm vs. SSE                              Yes    Yes CONTANMENTSPRAY PUMP PP-9E                      WEST PART OF THE ROOM. 4 FEET                            Ground Response Specinsn 2 MOTOR OPERATED DLSCHARGE                      NORTHWEST OF EAST CONTAINMENT TO CONTANMENTSPRAY                              SPRAY PUMP &#xb9;24'P-9E, 5 FEET ABOVE THE ADDITIVEEDUCTOR SHUTOFF VALVE 41      8    2.IM0-215    0  CONTAINMENTSPRAY I            AUXILIARY 573.00 E CONT SPRAY PMP RM - IN THE SOUTH PART                  Boundng Spearum vs. SSE        Yes                    Yes REFUEUNG WATER STORAGE                          OF THE ROOM, ON THE SOUTH SIDE OF THE                    Ground Respcnse Spectnm TANKTO EAST CONTAINMENT                        DMDER WAU ON THE 577 ELEVATION SPRAY PUMP PP4lE SUCTION 12                    PLATFORM MOTOR OPERATED SHUTOFF VALVE 42      8    2-NO-220    0  CONTAINMENTSPRAY/ WEST                  573.00 W CONT SPRAY PMP RM 5 FEET NORTHEAST                Y4$  Boundng Specuum vs. SSE                                      Yes CONTAINMENTSPRAY PUMP PP-                      OF WEST CONTAINMENTSPRAY PUMP &#xb9;2-PP-                      Ground Response S pectnsn 9W10 MOTOR OPERATED                            9W, IN THE MIDDLE OF THE ROOM. 6 FEET DISCHARGE SHUTOFF VALVE                        ABOVE THE FLOOR 8    24MO-221    0  CONTAINMENTSPRAY I WEST                  573.00 W CONT SPRAY PMP RM - N THE NORTH                  Y4$  Boundng Specuum vs. SSE                Yes            Yes    Yes CONTANMENT SPRAY PUMP PP-                      PART OF THE ROOM, 6 FEET NORTHEAST OF                    Ground Response Spectnm 9W DISCHARGE SHUTOFF 10                        WEST    CONTAINMENTSPRAY PUMP &#xb9;24'P-MOTOR OPERATED VALVE                            9W, 5 FEET ABOVE THE FLOOR 8    24M O.222    0  CONTANMENT SPRAY I WEST                  573.00 W CONT SPRAY PMP RM - N THE NORTtlEAST              Y4$  Bounding Spectnm vs. SSE      Yes            N/A    Yes    Yes CONTAINMENTSPRAY PUMP PP                        PART OF THE ROOM, 3 FEET NORTHEAST OF                    Ground Response Spectnm 9W DISCHARGE TO CONTAINMENT                    WEST CONTAINMENTSPRAY PUMP <<24'P-9W, SPRAY ADDfflVEEDVCTOR                          4 FEET ABOVE THE FLOOR SHUTOFF 2 MOTOR OPERATED VALVE 45      8    24MO-225      0  CONTAINMENTSPRAY I            AUXILIARY 573.00 W CONT SPRAY PMP RM IN THE SOUTH PART              Yes  Boundng Spectnm vs. SSE        Yes                    Yes    Yes REFUELING WATER STORAGE                        OF THE ROOM, ON THE SOUTH SIDE OF THE                    Grand Response Spectrum TANKTO WEST CONTAINMENT                        DIVIDERWAU2 FEET ABOVE THE GRATNG SPRAY PUMP PP4W SUCTION 12 MOTOR OPERATED SHUTOFF VALVE 8    24M0410      0  RESIDUAL HEAT REMOVALI EAST              573.00 EAST RHR PUMP RM - IN THE SOUTHWEST                Yes  Boundng Spectrum vs. SSE      Yes    Yes            Yes,    Yes RESIDUAL HEAT REMOVALPUMP                      PART OF THE ROOM, ON THE 577 ELEVATION                    Ground Response Spectnm PP45E SUCTION rqHVTOFF VALVE                    PLATFORM, ON THE SOUTH SIDE OF THE D MDER WALL 47      8    2-IM~        0  RESIDUAL HEAT REMOVALI WEST              573.00 W RHR PMP RM 8 FEET SOUTH OF WEST                  Yes  Bandng Spectmm vs. SSE                                Yes    Yes RESIDUAL HEAT REMOVALPUMP                      RESIDUAL HEAT REMOVALPUMP &#xb9;24'P45W,                      Ground Response Spectrum PP45W SUCTION SHUTOFF VALVE                    3FEETSOUTHOFTHEDMDERWAU INTHE SOUTHEAST CORNER OF 8    24SCM-221    0  MAINSTEAM I MAN STEAM LEAD              633.00 WMN STM STOP ENCl.-6 FEETWEST OF THE                Y4$  Boundng Specuum vs. SSE        Yes    Yes    N/A    Yes    Yes
                                &#xb9;2 TO AUXILIARYFEED PUMP                        EAST WALIONTHE 639 ELEVATION                            Ground Response Spectrum TURBINE 4 MOTOR OPERATED                        PLATFORM SHUTOFF VALVE 49      8    243 CM-231    0  MAINSTEAM I MAINSTEAM LEAD              633.00 WMN STM STOP ENCL-3FEET EAST OF                    Yes  Boundng Spectnm vs. SSE                              Yes    Yes
                                <<3 To AUXILIARYFEED PUMP                        STEAM GENERATOR &#xb9;3 STOP VALVEON THE                      Ground Response Spectrum TURBINE 4 MOTOR OPERATED                        639 ELEVATIONPLATFORM SHUTOFF VALVE 8    24/u40-220    0  MAINSTEAM I STEAM STOP VALVE            633.00 WMN STM STOP ENCL-10FEET SOUTH OF                  Y4$  Boundng Specuum vs. SSE                              Yes    Yes MRV-220 STEAM CYLINDER DUMP 4                  THE NORTH WALL. N THE CENTER OF THE                      Ground Response Spectrum MOTOR OPERATED VALVES                          ROOM SELECTOR VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and condusion (whether vedfied to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed prof ssional engineer.)
Print or Type Name                                nature                        Date                    Print or Type Name                            Signature                  Date
 
~ 't, Walkdown.. of 11/8/93                                                                    DC CC,        /IT 2                                                                                Page50f6 SCREENING VERIFICATI N DATA SHEET (SVDS)
Eqtsp.to                                                                  Room or Rav/Cceumn                                    Cspscrty vs.          Csp >          Anchor          Equ?r No.                                                                                                                          Demsnd Basis          Dem end?          OK?            OX?
51          24980-230  0  MAIN STEAMISTEAMSTOPVALVE        AUXILIARY  633.00 WMN STM STOP ENCL-2 FEET SOUTHWEST                      Boundrtg Spectrum vs. SSE      Yes    Yes      N/A    Yes    Yes MRV-230 STEAM CYLINDER DUMP                        OF STEAM STOP VALVE<<24ITR-230. ON                        Ground Response Spectrum VALVES4 MOTOR OPERATED                            639 ELEVATIONPLATFORM SELECTOR VALVE 2427406    0  MAINSTEAM I TURBINE DRIVEN        TURBINE  591 00 TB DRIVEN AUX FDWTR PMP -3 FT. NW OF      5SI 00  Yes  Boundstg S pecuum vs. SSE      Yes    Yes                      Yes AUX FEED PUMP PPR TRIP AND                        THE AUX FEED PUMP TURB NE 24?ME49, 6 FT                  Ground Response Spectnsn THROTTLE VALVE                                    ABOVE THE FLOOR 2-WMO-    0  ESSENTIAL SERVICE WATER I EAST SCREENHOUSE  591.00 E ESSNTL SERV WTR PMP RM-20 FEET          591.00        Boundstg Spectrum vs. SSE    Yes                    Yes    Yes 703        ESSENTIAL SERVICE WATER PUMP                      NORTHEAST OF EAST ESSENTIAL SERVICE                      Ground Response Spect/um PP-7E DISCHARGE SHUTOFF                            WATER PUMP      <<2+P-?E VALVE 2-WMO-    0  ESSENTIAL SERVICE WATER I      SCREENHOUSE  5S1.00 WESSNTLSERVWTRPMPRM          N THE        SS1.00        Boundstg Specuum vs. SSE                              Yes    Yes
                                                                                                                                        ~
704        WEST ESSENTIAL SERVICE WATER                      MIDDLENORTH PART OF THE ROOM, 5 FEET                    Ground Response Spectrum PUMP PP-7W DISCHARGE                              NORTHWEST OF WEST ESSENTIAL SERVICE SHUTOFF VALVE                                      WATER PUMP &#xb9;24'P-?W 2-WMO-        ESSENTIAL SERVICE WATER I        TURBINE  569.00 ESSNTL SERV WTR PIPE TVNN - 35 FEET                Yes            Speansn vs. SSE 706        WEST ESSENTIAL SERVICE WATER                      SOUTHEAST OF THE MIDDLEWATERTIGHT                        Ground Response Spectrum SUPPLY HEADER CROSSTIE TO                          DOORWAY UNiT 1 SHUTOFF VALVE 2.WMO-    0  ESSENTIAL SERVICEWATERIEAST      TURBINE  569.00 ESSNTL SERV WTR PIPE TUNN -35 FEET        633.00  Yes    Bounchrg Spectrum vs. SSE            Yes                      Yes 708        ESSENTIAL SERVICE WATER                            SOUTH OF THE MIDDLEWATERTIGHTDOOR, 5                    Grand Response Spectnsn SUPPLY HEADER CROSSTIE TO                          FEET ABOVE THE FLOOR UNiT 1 SHUTOFF VALVE 57            2.WMO-    0  ESSENTIAL SERVICE WATER I        AUXILIARY  587.00 2CD DSL RM N PIPE TUNNEL - IN THE                  Yes    BounrSng Spectrum vs. SSE    Yes    Yes              Yes    Yes 722~        WEST ESSENTIAL SERVICE WATER                      SOUTHWEST PART OF THE ROOM, 20 FEET                      Ground Response Spectrum SUPPLY HEADER TO AB                                EAST OF THE CD EMERGENCY DIESEL EMERGENCY DIESEL HEAT                              GENERATOR DOORWAY. NEAR THE SOUTH EXCHANGERS SHUTOFF VALVE                          WALL 2-WMO-    0  ESSENTIAL SERVICE WATER I EAST              587.00 2CD DSL RM N PIPE TUNNEL - IN THE                  Yes    Bcundrng SpeC&#xb9;um VS. SSE                              Yes    Yes 724~        ESSENTIAL SERVICE WATER                            NORTHWEST REGION OF THE ROOM, 25 FEET                    Grand Response Spectrum SUPPLY HEADER TO AB                                EAST OF THE CD EMERGENCY DIESEL EMERGENCY DIESEL HEAT                              GENERATOR ROOM NORTH DOORWAY, NEAR EXCHANGERS SHUTOFF VALVE                          THE 59            2-WMO-    0  ESSENTIAL SERVICE WATER I EAST              587.00 2CD DSL RM N PIPE TUNNEL - N THE                  Yes    Bouncing Spearum vs. SSE            Yes 726CD        ESSENTIAL SERVICE WATER                            SOUTHWEST PART OF THE TUNNEI 10 FEET                      Grand Response Spectrum SUPPLY HEADER TO CD                                EAST OF CD    EMERGENCY DIESEL EMERGENCY DIESEL HEAT                              GENERATOR DOORWAY. NEAR THE SOUTH EXCHANGERS SHUTOFF VALVE                          WALL 24/VMO    0  ESSENTIAL SERVICE WATER I        AUXILIARY  587.00 2CDDSLRMNPIPETUNNEL NTHE                                  Boundrtg Specuum vs. SSE                      N/A 72$ CD      WEST ESSENTIAL SERVICE WATER                      SOUTHWEST PART OF THE ROOM, 15 FEET                      Ground Response Spectrum SUPPLY HEADER TO CD                                WEST OF THE CD EMERGENCY DIESEL EMERGENCY DIESEL HEAT                              GENERATOR ROOM DOORWAY, NEAR THE EXCHANGERS SHUTOFF VALVE                          SOUTH 61            2-WMO-    0  AUXILIARYFEED WATER I ESW TO      TURBINE  59100  WMTR DRIVEN AUXFDWTR PMP -IN THE          591.00  Yes    Boundrtg Spectrum vs. SSE    Yes 744        WEST MOTOR DRIVAUX FEED                            NORTHWEST CORNER OF THE ROOM. 3 FEET                      Ground Response Spectrum PUMP PP4W SHUTOFF 4 MOTOR                          NORTHWEST OF WEST MOTOR DRIVEN OPERATED VALVE                                    AUXILIARYFEED PUMP <<2+P4W 2.WMO-    0  AUXILIARYFEED WATER I ESWTO        TURBINE  591.00 TB DRIVEN AUX FDWTR PMP N THE MIDDLE      591.00  Yes    Boundrng Spearurn vs. SSE 753        TURB DRIVEN AUXFEED PUMP PP-                      NORTH REGION OF THE ROOM. 6 FEET                          Grourd Response Spearum 4 SHUTOFF 6 MOTOR OPERATED                        NORTHEAST OF AVXII.IARYFEED PUMP VALVE                                              TURBINE &#xb9;24?MEM. 5 FEET ABOVE THE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional ngineer.)
                                                                                      /Z/3          yp Print or Type Name                              ig nature                      Date                    Print or Type Name                            Si nature                    Dae
 
Walkdown.          n of 11/8/93                                                            DC C          /IT 2                                                                              'sage 6 of 6 SCREENlNG VERIFICAi tVN DATA SHEET (SVDS}
Item  Eq. CI  Equss. ID Rev    System/Equipment Descnptcn                                  Room or Row/Cohrnn              Base  <4tr        Capacrtr vs.        Cap a  Caveats                  Equp No.      No                                                                                                Elev.              Demand Basis        Demand7  OK7                      OK7 2-WMO.      0  ESSENTIAL SERVICE WATER/        TURBINE    59 i.oo E MTR ORIV AUX FEEDWTR PMP    IN THE      591.00  Yes  BoeCing Spectrum vs. SSE                              Yes 754          ESSENTIAL SERVICE WATER TO                        MIDDLEOF THE NORTH PART OF THE ROOM.                    Ground Response Spectrum EAST MOTOR DRIVEN AUXIUARY                        5 FEET NORTH OF EAST MOTOR DRIVEN FEED PUMP PPQE SHUTOFF 4                          AUXIUARYFEED PUMP    //2'4E,  4 FEET MOTOR OPERATEO VALVE                              ABOVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
                                                                                            />l~        g Print or T pe Name                            Si na  re                        Date                    Print or Type Name                          Signature                      Date
 
Walkdown:          .. of 10I18/93                                                            DC CO          .IT 2                                                                                    'age  1 of 4 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl  Eqtap.tD  Rav    System/Equipment Dscrption                                  Room or Row/Column                Base                  Capacity vs.            Cap >  Caveats                Eqtap No.      No                                                                                                    Eisv.                Demand Bash            Demand?  OK?    'K?              OK?
24IVCGR      0  AUXIUARYBUILDNGVICONTROL                          4KV RM - 600V SWGR AREA - IN THE                            Bounding Spectrum vs. SSE        Yes MD-1          ROD DRIVE EQUIPMENT ROOM                          NORTHWEST PART OF THE ROOM, 4 FEET                          Ground Response Spectrum AND INVERTER AREAVENTILATION                      ABOVE 600V        SWITCHGEAR &#xb9;2-21A, 10 RECIRCVlATINGAIR INLET                            FEET ABOVE THE FLOOR DAMPER 7    2+IVCGR      0  AUXILIARYBUILDNGV/ CONTROL      AUXILIARY 609.00  4KVRM 600VSWGRAREA-NTHE                      609.00  Yes    Boundstg Spectrum vs. SSE        Y8$    Yes            Yes    Yes MD-2          ROD DRIVE EQUIPMENT ROOM                          NORTHWEST PART OF THE ROOM, 4 FEET                          Ground Response Spectrum AND INVERTER AREA VENTILATION                      ABOVE 600V        SWITCHGEAR &#xb9;2-21A. IN THE OUTSIDE AIR INLET DAMPER                          CEILING 7    2~-94N      0  CONTROL ROOM AIR CON /          AUXILIARY 650.00  CTRLRMAIRCONDITRM 3FEETEASTOF                                1.5 x Boundng Specaum vs.        Yes    Yes                    Yes CONTROL ROOM AIR                                  THE ROOM'S ENTRANCE GATE, ON THE                            Rearrsdc Median Centered  Fker CONDmONING NORTH CHILL                            NORTH WALL,7 FEET ABOVE THE FLOOR                                  Response Spectra WATER EXPANSION TANKTK-76N SAF ElY VALVE 7      2<V-94S    0  CONTROL ROOM AIR CON /          AUXIUARY  650.00  CTRL RM AIR COND IT RM - N THE                              1.5 x Boundstg Spectrum vs.                              Yes    Yes CON?Rot. ROOM AIR                                  SOUTHWEST AREA OF THE ROOM. NEAR THE                        Rearisdc Median Cantered Roor CONDmoNING SOUTH CHILL                            SOUTH WALI 8 FEET ABOVE THE FLOOR                                  Response Spectra WATER EXPANSION TANKTK.76S SAFETY VALVE 7    2-VRV<15      0  CONTROL ROOM AIR CON /          AUXILIARY 650.00  CTRL RM AIR CONDIT RM- IN THE NORTH                          1.5 x Boundtng Spectrum vs.      Yes                    Y8$    Yss CONTROL ROOM VENTILATION                          PART OF THE ROOM. 4 FEET WEST OF                            Reasstic Median Cantered Roor UNIT HVV,CRA-1 CHILLWATER                          CONTROL ROOM AIR HANDLINGSUBPANEL                                  Reaper>>e Spectra INLET/BYPASS VALVE                                <<2&CRA 1, 3 FEET ABOVE THE FLOOR 7    2-VRVM5      0  CONTROL ROOM AIR CON /          AUXILIARY 650.00  CTRL RM AIR CONDIT RM - IN THE SOUTHEAST                      1.5 x Boundrtg Spectrum vs.              Yes                    Yes CONTROL ROOM VENTIIATION                            PART OF THE ROOM, 3 FEET WEST OF                          Rearrsgc Median Centered Fker UNIT HVACRA-2  CHILLWATER                          CONTROL ROOM AIR HANDLINGSUBPANEL                                Response Spectra NLET/BYPASS VALVE                                  &#xb9;24 CRA-2. ON THE SOUTH WALI 24tV4?GS-    0  DIESEL ROOM VENTILAT/CD          AUXILIARY 586.00  REACTOR CABLE TUNN, QUAD 3 N THE            567.00  Yss    Boundstg Spectrum vs. SSE                Yes            Yes DCD          EMERGENCY DIESEL GENERATOR                          NORTHWEST REGION OF THE ROOM, 7 FEET                        Ground Response Spectrum ROOM VENTILATIONSUPPLY FAN                          NORTH OF REACTOR CABLE TUNNEL QUAD &#xb9;3 HV4?GS-2 OUTSIDE AIR SHUTOFF                        MIDDLE/NORTHSECTION FIRE DOOR &#xb9;24? R-DAMPER                                              AUX326. 7 FT. UP 24tv4GR      0  AUXIUARYBUILDNGV/4KVROOM        AUXILIARY  609.00  4KV RM -600V SWGR AREA - IN THE MIDDLE      609.00  Yes    Boundstg Spectrum vs. SSE        Y8$                    Yss    Yes MD4          600V SWITCHGEAR                                    EAST REGION OF THE ROOM, 12 FEET                            Ground Response Spectrum TRANSFORMERS AREA                                  SOUTHEAST OF 600V TRANSFORMER &#xb9;2-VENTILATIONSUPPLY FAN HV-                          TR21D, 11 FEET ABOVE THE FLOOR SGRS-7 SUCTION DAMPER 24tV<GR-        AUX/VARYBUILDINGV / 600VAC      AUXILIARY  613.00  4KV ROOM MEZZANINEAREA                      633.00  Yes    Boundstg Spectrum vs. SSE                Yes                    Yes MD4          MOTOR CONTROL CENTER                                                                                            Ground Respe>>e Spectrum MEZZANINEAREA VENTltATION SUPPLY FAN HV4GRS-9 VENT DAMPER 10            124tv-      0  SCREENHOUSE VENTItAT/UNIT 2 SCREENHOUSE    591,00  EESSNTLSERVWTRPMPRM INTHE                    567.00  N/A    1.5 x Btxxtdstg Spectrum vs.      Yes    Yes            Yss      Yes ESW-1          EAST ESSENTIAL SERVICE WATER                      NORTHEAST CORNER OF THE ROOM. 15 FEET                      Rearrsdc Mergan Cantered Roor PUMP ROOM SUPPI.Y VENTltATION                      NORlHEAST OF EAST ESSENTIAL SERVICE                                Response Spectra FAN                                                WATER PUMP &#xb9;2+P-?E 13 FEET ABOVE 124tv-    0  SCREENHOUSEVENTItAT/UNIT2 SCREENHOUSE      591.00  E ESSNTL SERV WrR PMP RM IN THE              567.00  N/A    1.5 x Boundrtg Spectrum vs.      Y8$            Yss    Yss    Yes ESW-2          EAST ESSENTIAL SERVICE WATER                        NORTHWEST CORNER OF THE ROOM, 15 FEET                    ReaMc Median Centered Fker PUMP ROOM SUPPLY VENTILATION                        NORTHEAST OF EAST ESSENTIAL SERVICE                              Response Spectra FAN                                                WATER PUMP &#xb9;2+P-?E 13 FEET ABOVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
(+/If      /                                                                                              l2  I2 Dae 45'ate Print or T pe Name                              Si nature                                                    Print or T pe Name                                Sl nature
 
1 4Q
 
Walkd own:            3f 10/18/93                                                                              DC CG        SIT 2                                                                                Page 2 of%
SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. CI  Equp.to  Rev                                                                Fker                                              Base                  Capacity vs.            Cap >                    Equp No.      No                                                                Elov.                                            Elev.                Oomaxl 8$ $ >>            Demand?    OK?            OK?
12              124tv-    0  SCREENHOVSEVENTILAT/UNIT2 SCREENHOUSE                        591.00 WESSNTL SERVWTR PMP RM- IN THE                          1.5 x Bounding Spectrum vs.        Yes  Yes Yos    Yes ESWG          WEST ESSENTIAL SERVICE WATER                                        NORTHEAST CORNER OF THE ROOM. 15 FEET                  Real>>dc Median Centered Fker PUMP ROOM SUPPLY VENTILATION                                        NORTHWEST OF WEST ESSENTIAL SERVICE                            Rospor>>e Spectra FAN                                                                WATER PUMP &#xb9;24'P-?W. 13 FEET ABOVE 13            12+IV. 0  SCREENHOUSE VENTILATIUNIT 2 SCREENHOUSE                      591.00 W ESSNTL SERV WTR PMP RM - IN THE                        1.5 x Boundeg Spearum vs.          Yos  Yes Yes    Yos    Yes ESW4          WEST ESSENTIAL SERVICE WATER                                        NORTHWEST CORNER OF THE ROOM, 15 FEET                  Roar>>5c Median Centered Boor PUMP ROOM SUPPLY VENTILATION                                        NORTHWEST OF WEST ESSENTIAL SERVICE                            Response Spectra FAN                                                                WATER PUMP &#xb9;2+P.?W. 13 FEET ABOVE 14          24IV4ES      0  AUXILIARYBUILDNGV I AUXILIARY AUXILIARY                      633.00 NORM BLOWDOWN FLASHTANKRM - IN THE                      1.5 x Boundstg Spectrum vs.              No  No      Yes    No 1          BUILDINGVENTILATION                                                NORTHWEST REGION OF THE ROOM, 20 FEET                  Real>>54 Morf>>n Centered Fker ENGINEEREO SAFETY FEATURE                                          NORTHEAST OF STEAM GENERATOR NORMAL                            Response Spectra EXHAUST UNIT 1                                                      SLOWDOWN FlASH TANK2-TK-99 15          240I4ES          AUXIUARYBUILDNGV I AUXII.IARY AUXILIARY                      63L00  NORM BLOWDOWN FLASHTANKRM IN THE                        1.5 x Baxx4ng Spectrum vs.                    No      Y4$
2          BVILDNGVENTILATION                                                  NORTHWEST REGION OF THE ROOM, 20 FEET                  Reafistic Median Centered Fker ENGINEERED SAFElY FEATURE                                          NORTHWEST OF SGB D FLASHTANK2-TK46                            Response Spectra EXHAUST UNIT 16          24IV4F P    0  AUXILIARYBUILDING                                  AUXILIARY 633.00 MORM BLOWDOWN FLASHTANKRM IN THE                        1.5 x Bounchng Spectnsn va          Yes  Y4$ Yes V/TRAN'N'AlTERY Yes    Yes BRE I                  ROOM EAST EXHAUST                                          SOUTHEAST REGION OF THE ROOM, ON THE                    R4$ 5$ 5c Median Centered Floor FAM                                                                SOUTH WALLOF THE N.TRAIN BATTERY                              Response Spectra ROOM. NEAR THE EAST WALL6 FEET ABOVE 24IV4FP-    0  AUXILIARYBUILDING VI                              AUXILIARY 633.00 NORM BLOWDOWN FLASHTANKRM IN THE                        1.5 x Boundrtg Spoctnsn vs.        Yes  Y4$ Yos TRAIN'N'ATTERY Yes    Yos BRE-2                  ROOM WEST EXHAUST                                          SOUTHEAST REGION OF THE ROOM, ON THE                    Roassth Modlsn Centered Fker FAN                                                                SOUTH WALLOF THE N-TRAIN BATTERY                              Response Spoclfa ROOM, 6 FEET ABOVE THE FLOOR 18          24tv4FP      0  TURBlNE BUILDNGYEN I EAST                                    591 00 E MTR DRIVAUXFEEDWTR PMP IN THE            591.00        1.5 x Bounding Spectrum vs.        Yos  Yos Yes    Yes    Yes Ml          MOTOR DRIVEN AUXILIARY                                              NORTHWEST CORNER OF THE ROOM. ON THE                    Roar>>uc Median Centered Fker FEE DWATER PUMP ROOM                                                WEST WAU12 FEET ABOVE THE FLOOR ~                            Response Spectra EXHAUST FAN 19          2-HV4FP      0  TURBINE BUILDINGYEN I EAST                          TURBINE  591.00 E MTR DRIVAUXFEEDWTR PMP    - IN THE      591.00        1.5 x Bcund4ng Spectrum vs.                  Yos    Yes M2          MOTOR DRIVEN AVXIUARY                                              SOUTHEAST CORNER OF THE ROOM, ON THE                    ROSMc Median Centered Fker FEEDWATER PUMP ROOM SUPPLY                                          SOUTH WAU12 FEET ABOVE THE FLOOR                              Rospcnse Spectra FAN 24IV4FP-    0  TURB lNE BUILDINGVEN I TURBINE                      TVRBINE  591.00 TB DRIVEN AVXFDWTR PMP - IN THE            591.00        1.5 x Bounding Spectrum vs.              Y4$ Yos T1          DRIVEN AUXILIARYFEED PUMP                                          NORTHWEST CORNER OF THE ROOM, ON THE                    ROOMc Median Cenlered Fker ROOM NORTH EXHAUST FAN                                              WEST WALI 12 FEET ABOVE THE FLOOR                              Re        S      a 21          24tv4FP-    0  TURBlNE BVILONGVENITURBNE                          TURB NE  591.00 Te DRIVEN AUXFDWTR PMP - IN THE            591.00        1.5 x Bouncbrg  Spctrurn vs.      Yes  Y4$        Yos    Yes T2          DRIVEN AUXILIARYFEED PUMP                                          SOUTHWEST CORNER OF THE ROOM, 4 FEET                    Rear>>dc Median    Centered Fker ROOM SOUTH EXHAUST FAN                                              WEST OF AUXFEED PUMP TURBlNE &#xb9;24?ME-                          Response  Spectra 39, ON THE WEST WAU 12 FEET ABOVE THE FLOOR 24tv4F P-    0  TURBINE BUILDNGYEN I WEST                          TURBINE  591.00 W MTR DRNEN AVXFDWTR PMP N THE                    NIA  1.5 x Bounding Spectrum vs.        Yos      Yes    Yes    Yes X1          MOTOR DRIVEN AtBQLIARYFEED                                          NORTHEAST REGION OF THE ROOM, ON THE                    Reaatuc Median Centered Fker PUMP ROOM EAST EXHAUSTFAN                                          NORTH WALL8 FEET NORTH OF WEST                                Rosponse Spectra MOTOR DRNEM AVXFEEDWATER PUMP &#xb9;2-PP4W.
24IV4FP      0  TURBNE BUILDNGVEN I WEST                            TVRBNE  591.00 TB 591 ELEV BASMNT ON THE NORTH WALL      591.00        1.5 x Basxling Spearum va                Yos X2          MOTOR DRIVEN ALDOUARYFEED                                          OF THE WEST MOTOR DRIVEN AUXILIARY                      Rear>>dc Median Centered Floor PUMP ROOM WEST EXHAUST FAN                                          FEED PUMP ROOM, 4 FEET SOUTHEAST OF                            Response Spectra THE EAST UNIT DMDING Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and conclusion (whether verified to be seismica! Iy adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                                                Si nature                        Date CZ  /2 Print or Type Name                                Si nature              Date
 
Walkdown:          . of 10/18/93                                                          DC CO        AtT2                                                                                Page  30f4 SCREENlNG VERlFlCATION DATA SHEET (SVDS)
Equip,lo    Rev                                                              Room or Row/Cobmn              Base                    Capacity vs.          Cap >                      EIFMI No.      No                                                                                              Elev.                  Demand Basis          Demand7                      OK7 24            24tv-      0  AUXIUARYBUILDNGV/COMTROL        AVXIUARY  609.00 4KV RM - 600V SWOR AREA - IN THE                          1.5 x Bounding Spectrum vs.      Yos  Yes          Yes    Yos SGRS-1A          ROD DRIVE EQUIPMENT ROOM                        NORTHWEST PART OF THE ROOM, 5 FEET                      Reafistic Median Centered Boor AND INVERTER AREA VENTltATION                    WEST OF 600V SWITCH GEAR &#xb9;2-21A, 13 FEET                        Response S pectra NORTH SUPPLY FAN                                ABOVE THE FLOOR 25            24tV      0  AUXII.IARYBUILDINGV/4KVROOM    AUXILIARY 609.00 4KVRM AB4KVSWGRAREA-INTHE                                1.5 x Bounding Spectrum vs.      Yos  Yos          Yes    Yes SGRS-2          AB 4KV SWITCHGEAR AREA                          NORTHWEST CORNER OF THE ROOM, 7 FEET                    ReaMc Median Centered Fbcr VENTILATIONSUPPLY FAN                            SOUTH OF THF ROOM'S ENTRANCE, 12                                Response Spectra FEET ABOVE THE FLOOR 24/V-          AUXILIARYBUILDING V /4KV ROOM  AUXILIARY 609.00 4KV RM CD 4KV SWGR AREA IN THE                            15 x Boundng Spectrum vs.                            Yes    Yos SGRS6            CD 4KV SWITCHGEAR AREA                          NORTHEAST CORNER OF THE ROOM, ON THE                    Roassdc Metfian Centered Fbor VENTILATIONSUPPLY FAN                            NORTH WALL 12 FEET ABOVE THE FLOOR                              Response Spectra 27            24tv-      0  AUXILIARYBUILDNGV/CONTROL                        4KV RM 600V SWOR AREA - IN THE                            1.5 x Boundng Speci/um vs.      Yos  Yes          Yos SGRS~            ROD DRIVE EQUIPMENT ROOM                        NORTHWEST PART OF THE ROOM, 3 FEET                      Rearistic Motrian Centered Boor AND INVERTER AREA VENTILATION                    SOUTH OF 600V SWITCHGEAR &#xb9;2-21A, 14 FEET                        Response Spectra SOUTH SUPPLY FAN                                ABOVE THE FLOOR 28            24tv-      0  AUXILIARYBUILDINGV/4KVROOM      AUXILIARY 609.00 4KV RM 600V SWOR AREA- IN THE MIDDLE                      1.5 x Bounding Spectrum vs.      Yes        Yes    Yes    Yos SGRS-7          600 VOLT SWITCHGEAR                              EAST PART OF THE ROOM, 10 FEET NORTH OF                  Reatstic Median Centered Fker
                                                                                                                                                ~
TRANSFORMERS TR21B AND                          600V TRANSFORMER &#xb9;2-TR21D, 14 FEET                              Response Spectra TR21D AREA VENTIIATIONSUPPLY                    ABOVE THE FLOOR FAN 24IV-      0  AVIQLIARYBUILDING V/4KVROOM    AUXILIARY 609.00 4KV RM - 600V SWGR AREA - IN THE MIDDLE                  1.5 x            Spectrum vs. Yes  Yos          Yos    Yes SGRS6          600 VOLT SWITCHGEAR                              WEST PART OF THE ROOM, 5 FEET NORTH OF                  Rotc Macron centered      Fkor TRANSFORMERS TR21A AND                          600V SUPPLY TRANSFORMER &#xb9;Z-TRZtA, 14                            Rasped>>e Specva TR21C AREA VENTILATIOMSUPPLY                    FEET ABOVE THE FLOOR FAN 2+IV-      0  AUXILIARYBUILDINGV/600VAC      AUXILIARY 613.00 4KVROOM MEZZANINEAREA NTHE                                1.5 x Bounding Spectrum vs.      Yes  Yos  Yes    Yes    Yes SGRS6            MOTOR CONTROL CENTER                            MIDDLE NORTH REGION AREA, 1 FOOT WEST                    Reafistic Median Centered Fbcr MEZZANINEAREA VENTILATION                        OF PIANT BATlERYCONTROL PANEL &#xb9;26C-                              Response Spectra SUPPLY FAN                                      AB, 9FEETABOVE THE FLOOR 31            24IV-      0  AUXILIARYBUILDINGV/4KVROOM      AUXILIARY 609.00 4KVRM-AB4KVSWGRAREA INTHE                                1.5 x Bounding Spectrum vs.      Yes  Yos  Yes    Yes    Yos SGRX.2          AB 4KV SWITCHGEAR AREA                          SOUTHEAST CORNER OF THE ROOM. 2 FEET                    Rearisyc Mtxrian Centered Fbor VENTILATIONEXHAUST FAN                          SOUTH OF      4KV SWiTCHGEAR &#xb9;2-T21A, 10                        Response Spectra FEET ABOVE THE FLOOR 24IV-      0  AUXILIARYBUILDINGV/4KVROOM                      4KV RM - CD 4KV SWOR AREA - IN THE                        1.5 x Bounding  Spoctnxn vs.          Yos          Yes    Yes SGRX6          CD 4KV SWITCHGEAR AREA                          SOIJIHWEST CORNER OF THE ROOM, CEILING                  Rearisdc Median  Centered Fbor VEMTIIATION EXHAUST FAN                          MOUNTED.      14 FEET ABOVETHE FLOOR                            Response  Spectra 24tv-          AUXILIARYBultDNG V/AB                            AS BATTERY EQUIP AREA - IN THE MIDDLE                    1.5 x Bourxong  Specuum  vs. Yes  Yos  Yes    Yes    Yes SGRX6          BATTERY EQUIPMEMTAREA                            SOUTH REGION OF THF ROOM. NEAR THE                      RoaMc Meirian Centered    Fbor BATTERY ROOM VENlltATION                        CEIUNG                                                          Response Spectra EXHAUST FAM 24tv-      0  AUXILIARYBUILDINGV/ CD          AUXILIARY        CD BATTERY EQUIP AREA IN THE              633.00  WA    1.5 x Bounding Spoctrl&l vs. Yos  Yos  Yos    Yes    Yes SGRX6          BATTERY EQUIPMENT AREA                          SOUTHWEST CORNER OF THE ROOM, NEAR                      Rotc Median Centered      Fbor BATTERY ROOM VENTIIATION                        THE CEILING                                                      Response Spectra EXHAUST FAN 10      24tv-      0  CONTROL ROOM VENTltA/          AUXILIARY 650.00 CTRL RM AIR COND IT RM - IN THE                            1.5 x Bounding Spectrum vs.          Yes  Yes ACRA-1          CONTROL ROOM VENTILATION                        NORTHWEST PART OF THE ROOM, 10 FEET                      ROOMc Median Centered Fbor NORTH AIR CONDITIONNG UNIT                      SOUTHEAST OF THE UNIT 2 CONTROL ROOM                            Response Spectra AIR CONDmoNING ROOM DOORWAY 10      24tv        0  CONTROt. ROOM VENTltA/                          CTRLRMAIRCONDITRM NTHEMIODLE                              1.5 x Boundng Specuum vs.      Yes                Yes    Yes ACRA-2          CONTROL ROOM VEMTBATION                          SOUTH REGION OF THE ROOM                                ROS5sdc Median Centered    Fbor SOUTH AIR CONDITIONING UNIT                                                                                      Response Spectra Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
lg  /g Print or T pe Name                              Signature                        Date                    Print or Type Name                                  nature                Date
 
Walkdown:      Irt        f 10/18/93                                                            DC CO          .]IT 2                                                                              Page 4 of 4 SCREENING VERIFICATION DATA SHEET (SVDS)
Item  Eq. CI    EquSI.ID    Rev      System/Equrpment Descripten              Fker            Room or Rovr/Column            Base                  Capacity vs.            Cap > Csveats Anchor        Equrp No.      No                                              Ekrv.                                          Elev.                Demand Basis          Demand?  OK?    OK?          OK?
37    10    24IV4ES        0  AUXILIARYBUILDINGV/AUXILIARY      AUXILIARY        NORM SLOWDOWN FLASHTANKRM                        N/A  1.5 x Boundstg Spectrum vs.        Yes    Yes    Yes    Yes    Yes 1(FLTI        BUILDINGVENTILATION                                                                                      Realistic Median Centered Rcor ENGINEERED SAFElY FEATURE                                                                                        Response Spectra EXHAUST AIR FILTER 36    10    24IV4ES-      0  AUXILIARYBUILDINGV/AUXIUARY      AUXILIARY        NORM BLOWDOWN FLASHTANKRM                              1.5 x Brxndstg Spectrum vs.        Yes          Yes    Yes    Yes 2 (FLTI        BUILDINGVENTILATION                                                                                      Rearrsdc Marfen Centered Floor ENGINEERED SAFETY FEATURE                                                                                        Response Spectra EXHAUST AIR FILTER 39    11    24IV4CR-      0  CONTROL ROOM AIR CON /            AUXILIARY        CTRL RM AIR CONDIT RM - IN THE                        1.5 x Brxmdstg Spactnsn vs.        Yes                  Y88    No I          CONTROL ROOM AIR                                  NORTHWEST PART OF THE ROOM. ON THE                    Reafetic Median Centered F kcr CONDmoNING NORTH LIQUID                            NORTH WALI 4 FEET NORTHWEST OF                                Response Spectra CHILLER                                            CONTROL ROOM VENTILATIONNORTH AtR CONDmONING 40    11    24tv4CR-          CONTROL ROOM AIR CON /            AUXILIARY        CTRL RM AIR CONDIT RM - IN THE          650.00        1.5 x Brxatdrng Spectrum vs.      Yes    No            Yes    No 2          CONTROL ROOM AIR                                  SOUTHWEST REGION OF THE ROOM, ON THE                  Rearrstic Median Centered Fker CONDmoNING SOUTH LIQUID                            SOUTH WALI    5 FEET SOUTHWEST OF                            Response Spectra CHiLLER                                            CONTROL ROOM VENTILATIOMSOUTH AIR 41    11      2-HE%3M      0  CONTROL ROOM AIR                  AUXILIARY        CONTROL RM, A/C RM                              N/A  1.5 x Boundrng Spacuum vs.        Yes    Yes    Yes    Yes    Yes CONDITIONINGCHILLWATER /                                                                                Resrrssc Median Centered Roor CONTROL ROOM AIR                                                                                                Response Spectra CONDmo NING NORTH LIQUID CHILLER HV4CR-1 EVAPORATOR 42    11      24IE43S      0  CONTROL ROOM AIR                  AUXILIARY        CONTROL RM. A/C RM                              N/A  1.5 x Boundrtg Spectrum vs.              Yes    Yas    Yas    Yes CONDmONING CHILLWATER /                                                                                  Resrrsdc Median Centered Roor CONTROL ROOM AIR                                                                                                Res pares Spectra CONDITIONING SOUTH LIQUID CHILLER HV4CR-2 EVAPORATOR 43    11      24tM4N        0  CONTROL ROOM AIR                  AUXILIARY        CONTROL RM. A/C RM                              N/A  1.5 x Brxndrtg Spectrum vs.              Yes          Yes    Yes CONDITIONING CHILLWATER/                                                                                Realistic Median Centered Roor CONTROL ROOM AIR                                                                                                Response Spectra CONDITIONING NORTH LIQUID CHILLER HV4CR-1 CONDENSER 44    11      2&EW46        0  CONTROL ROOM AIR                  AUXILIARY      CONTROL RM. A/C RM                                    1.5 x Boundstg Spectrum vs.        Yes    Yes    Y8S    Y8S    Yes COND moNING CHILLWATER /                                                                                Rearedc Meden Centered Fkxx CONTROL ROOM AIR                                                                                                Response Spectra CONDITIONINGSOUTH LIQUID CHILLER HV4CR-2 CONDENSER 45      6    2.HV4GR-      0  AUXILIARYBUILDINGV/4KVRM          AUXILIARY      4KV RM -600V SWOR AREA IN THE            609.00  Yes    Bouncstg spectnsn vs. SSE        Yes    Yes          Yes    Yes MD4          600 VOLT SWITCHGEAR                                SOUTHWEST REGION OF THE ROOM, ON 600V                  Ground Response Spectrum XFORMERS TR21A 6 TR21C AREA                        SWITCHGEAR TRANSFORMERS AREA VENT SUPPLY FAN HV4GRS4I SUCTION DAMPER Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
                                                                                          .z/
Print or T pe Name                                  Signature                      Date                  Print or Type Name                                Si na re                  Date
 
Walkdown.. of 10/16/93                                                                    DC C          .ttT2                                                                                        toage  1 of 6 SCREENING VERIFICAT ON DATA SHEET (SVDS)
Eq. CI  Equp.lo Rev    System/Eqripment escct'peon                                Room or Raw/Cotumn Na    No Capacrty vs.            Cap >>  Caveats                        Equ'St Demand Bass              Demand?  OK?        OK7                OK?
1      18  ZCLI.113  0  CONDENSATE STORAGE T I          AUXILIARY  58tk00 STORAGE TANKPIPE TUNNEL IN THE          587.00  Yes    Boundstg Spectrum vs. SSE                Yos                  Yes      Yo&#xb9; COND ENSATE STORAGE TANKTK.                        SOUTHEASTAREAOF THE PIPE TUNNEI 2                        Ground Response Spectrum 32 LEVELINDICATOR                                  FEET SOUTH OF THE CONDENSATE TRANSMITTER                                        STORAGE TANKACCESS LADDER. 5 FEET ABOVE THE 2      18  24LI-114      CONDENSATE STORAGE T I          AUXILIARY  586.00 STORAGE TANKPIPE TUNNEL IN THE          587.00  Yes    Boundstg Spectrum vs. SSE                Yes                          Yes CONDENSATE STORAGETANKTK-                          SOUTHEAST AREA OF THE PIPE TUNNEI 5                      Ground Response Spec//urn 32 LEVEL INDICATOR                                  FEET SOUTH OF THE CONDENSATE TRANSMITTER                                        STORAGE TANKACCESS lADDER. 5 FEET ABOVE THE 3    18    2<P&410    0  COMPONENT COOLING WAIEAST        AUXILIARY  609.00 609 HALLWAY-4 FEET EAST OF EAST CCW                      Boundstg Spectnsn vs. SSE COMPONENT COOUNG WATER Yes      Yes PUMP &#xb9;24'P-1 OE                                          Ground Response Spectrum PUMP PP-10E DISCHARGE PRESSURESWITCH 4    18    24:PM20    0  COMPONENT COOUNG WA/WEST                    609.00 609 HALLWAY 4 FEET EAST OF WEST                          Bound/ng Spectrum vs. SSE COMPONENT COOUNG WATER                                                                                                                                                                Yes COMPONENT COOUNG WATER PUMP &#xb9;24'P-                        Ground Response Spectnsn PUMP PP-1 OW DISCHARGE,                            10W PRESSURESWITCH 5    18    2+Fl-210  0  AUXILIARYFEEDWATERI              AUXILIARY  621.00 E MAINSTM STOP ENCL OM THE              633.00  Yes    Banaing Spectrum vs. SSE AUXILIARYFEEDWATER TO STEAM                                                                                                                                                          Yes NORTHWEST CORNER OF THE ROOM. 4 FEET                      Ground Response Spectrum GENERATOR OMEN.1 FLOW                              ABOVE THE FlOOR INDICATORTRANSMITTER 6    18    24'Fl-220  0  AUXILIARYFEEDWATER I            AUXILIARY  621.00 WMN STM STOP ENCL 14 FEET SOUTHEAST 633.00        Yes    Boundstg Spectrum vs. SSE                Yes                          Yes AUXILIARYFEEDWATER TO STEAM                        OF THE STAIRWAY.4 FEET ABOVE THE FLOOR                    Ground Response Spectrum GENERATOR OMEWZ FLOW INDICATORTRANSMITTER 7    18    2+FI.230  0  AUXILIARYFEEDWATER I            AUXILIARY  621.00 WMN STM STOP ENCL 5 FEET SOUTH OF        650.00  N/A    1.5 x Boundrtg Spectrum vs.      Yes    Yes        Yes      Yes      Yes AUXILIARYFEEDWATER TO STEAM                        THE BOTTOM OF STEAM STOP VALVE&#xb9;3                        ROO5ssc Mrxsan Centered  Ficor GENERATOR OME44 FLOW Response Spectra INDICATORTRANSMITTER 8    18    2+FI.240  0  FEEDWATER I AUXILIARY            AUXILIARY  621.00 E MAIMSTM STOP ENCL - ON THE SOUTH                        1.5 x Boundng Spectrum vs.        Yos    Yes                  Yos      Yes FEEDWATER TO STEAM                                  WAU15 FEET SOUTHWEST OF THE                            Reassdc Morsan Centered Rcor GENERATOR OME~ FLOW                                STAIRWAY,5 FEET ABOVE THE FLOOR                                Response Spectra INDICATORTRANSMITTER 9    18    24F 1410  0  RESIDUAL HEAT REMOVAIEAST        AUXILIARY  609.00 609 HALLWAY- 7 FEET EAST OF THE          609.00  Yes    Bourxsng Spearum vs. SSE          Yos    Yes        Yes      Yes RESIDUAL HEAT REMOVALHEAT                          CONTAINMENTSPRAY HEAT EXCHANGER                          Grand Response Spectrum EXCHANGER HE-1 7E OUTLET LOW                        ROOM DOORWAY, ON THE SOUTH WAUS RANGE FLOW INDICATOR                                FEET ABOVE THE FLOOR TRANSMITTER 10    18    24F MI 1  0  RESIDUAL HEAT REMOVAI EAST      AUXILIARY  609.00 609 HALLWAY 2 FEET EAST OF THE                            Boundstg Speansn vs. SSE          Yos    Yes        Yes RESIDUAL HEAT REMOVALHEAT                          RESIDUAL HEAT REMOVALHEAT EXCHANGER                      Ground Response Spectrum EXCHANGER HE-1?E OUTLET HIGH                        ROOM DOORWAY, ON THE SOUTH WAU4 RANGE FLOW INDICATOR                                FEET ABOVE THE FLOOR TRANSMITTER 11    18    24FI420  0  RESIDUAL HEAT REMOVAIWEST        AUXILIARY  609.00 609 HALLWAY-8FEET WEST OF THE            609.00  Yes    Boundrng Spectrum vs. SSE        Yes    Yes                            Yes RESIDUAL HEAT REMOVALHEAT                          RESIDUAL HEAT REMOVALHEAT EXCHANGER                      Ground Response Spectrum EXCHANGER HE-17W OUTLET LOW                        ROOM DOORWAY, NEAR THE SOUTH WAU5 RANGE FLOW INDICATOR                                FEET ABOVE THE FLOOR TRANSMITfER Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should. be a licensed professional engineer.)
Print or T pe Name                                ature Iz(fg( s Date                  Print or T pe Name                                  Si nature                        Date
 
Q
  ~
C
 
Walkdown:          .. of 10/18/93                                                          DC CO          .4IT 2                                                                              'age2of6 SCREENING VERIFICATION DATA SHEET (SVDS)
Equsl.lo    Rev Capacrty vs.            Cap >  Cavsats Anchor        Equip No.        No                                                                                                                  Demand Basis            Demand?  OK?    OK?          OK?
12    18    2-IF 1421    0  RESIDUAL HEAT REMOVAIWEST      AUXILIARY 609.00 609 HALLWAY- 2 FEET EAST OF THE                          Boundeg Spect/um vs. SSE                Yss                  Yes RESIDUAL HEAT REMOVALHEAT                        PASSENGER ELEVATOR NEAR THE SOUTH                        Ground Response Spectrum EXCHANGER HE-17W OUTLET HIGH                    WALI 4 FEET ABOVE THE FLOOR RANGE FLOW INDICATOR TRANSMITTER 13    18    2-IF 1435    0  RESIDUAL HEAT REMOVAI                    591.00 VESTIBULE -3 FEET NORTH OF VESTIBULE                    84xeaeg Specinsn vs. SSE        Yss                          Yes RESIDUAL HEAT REMOVALTo                          DOORWAY                                                  Ground Response Spectrum REACTOR COOLANT LOOPS &#xb9;2 AND &#xb9;3 COLD LEGS FLOW INDICATORTRANSMITTER 14    18    24LS450      0  REFUEUNG WATER STOR I                    586.00 STORAGE TANKPIPE TUNNEL IN THE                    Yes    Boundeg Spectrum vs. SSE                                Yss    Yes REFVEUNG WATER STORAGE                          SOUTHEAST AREA OF THE PIPE TUNNEI 9                      Gnwxl Response    Spectnsm TANK7K'XTREME LOW LEVEL                          FEET EAST OF THE REFUELING WATER TRANSMGTER                                      STORAGE TANKACCESS lADDER. 7 FEET ABOVE THE 15    18    24LS-951      0  REFV EUNG WATER STOR I                    58IL00 STORAGE TANKPIPE TUNNEL IN THE                          Bounaeg Spectnsn vs. SSE        Yes            Yes            Yes REF VEUNG WATER STORAGE                          SOUTHEAST AREA OF THE PIPE TUNNEI 5                      Ground Response Spectnsn TANKTK43 LEVELTRANSMITTER                        FEET EAST OF THE REFUELING WATER STORAGE TANKACCESS lADDER 7 FEET ABOVE THE 16    18  241PP-210      0  MAINSTEAM I STEAM GENERATOR              633.00 E MAINSTM STOP ENCL 4 FEET SOUTHWEST      650.00        1> x Bounaeg Specuum vs.                Yss    Yss    Yss    Yes 0ME4-1 CHANNEL I STEAM                          OF STEAM GENERATOR STOP VALVE&#xb9;24IRV-                  Rear>>ac M<<fian Centered Fkior PRESSURE TRANSMITTER                            210, ON THE WEST WALI AT THE 647                              Response Spectra ELEVATION PIATFORM. ENCASED IM 17    18  24IPP-212      0  MAINSTEAM I SlEAM GENERATOR              633.00 E MAINSTM STOP ENCL - IN THE NORTHWEST    650.00        1> x Bounaeg spectrum vs.                Yes    Yes            Yes OMEW1 CHANNEL IV REACTOR                        PART OF THE ROOM, 15 FEET NORTHWEST OF                ROOSSSc  Median Centered Fkcr PROTECTION INPUT STEAM                          STEAM GENERATOR STOP VALVE&#xb9;24IRV.210,                        Response Spectra PRESSURE TRANSMITTER                            ON THE 647 ELEVATION 18  24IPP-220      0  MAINSTEAM I SlEAM GENERATOR    AUXILIARY 633.00 WMM STM STOP ENCL -12 FEET EAST OF        650.00        1.5 x 84xeaeg Specaum vs.                Yes                  Yes OME4.2 CHANNEL I STEAM                          STEAM GENERATOR STOP VALVE&#xb9;24IRV.220,                  Rear>>ac Median Centered Fkior PRESSURE TRANSMIITER                            ON THE CONTAINMENTWALL, ON THE 653                            Respoflss Spectra ELEVATION PIATFORM 19    18  24APP-222      0  MAINSTEAM I STEAM GENERATOR    AUXILIARY 633.00 WMN STM STOP ENCL 14 FEET NORTHEAST        650.00        1.5 x Bounacg Spectrum vs.      Yes                    YOS4  Yss OMEN-2 CHANNEL Ill REACTOR                      OF STEAM GENERATOR STOP VALVE&#xb9;24IRV                    ROSSsdc  M<<Ssn Centered Fker PROTECTION INPUT STEAM                          220, AT THE CONTAINMENTWALI 1 FOOT                            Response Spectra PRESSURE TRANSMITTER                            ABOVE THE 653 ELEVATION 18  24IPP-230      0  MAINSTEAM I STEAM GENERATOR    AUXILIARY 633.00 WMN STM STOP ENCL 6 FEET NORTHWEST        6SO.OO        1.5 x Bounaeg Spectrum vs.      Yes    Yes    Yes            Yos OMM4 CHANNEL I                                  OF STEAM GENERATOR STOP VALVE&#xb9;24IRV-                  Rear>>dc Median Centered Floor STEAMPRESSURE TRANSMllTER                        230. ON THE 653 ELEVATIONPLATFORM                            Re        S      a 2'I    18  24IPP-232      0  MAINSTEAM I STEAM GENERATOR              63300  WMN STM STOP ENCL 10 FEET SOUTHWEST        6SOOO  N/A    1.5 x Bounaeg Spectrum vs.      Yes    Yss                  Yes OME~ CHANNEL BI REACTOR                          OF STEAM GENERATOR STOP VALVE&#xb9;24ARV-                  Rear>>ac Median Centered Fkior PROTECTION INPUT STEAM                          230, ONTHE653ELEVAllOMPLATFORM                                Response Spectra PRESSURE TRANSMITTER
        'la  24IPP-240      0  MAINSTEAM I STEAM GENERATOR              633.00 E MruN STM STOP ENCt. - IN THE NORTHWEST  650.00 N/A    1.5 x Bounaeg Spectrum vs.              Yss Yes            Yss            Yes OME~ CHANNEL I                                  PART OF THE ROOM, 3 FEET NORTHWEST OF                  Realstic Median Centered Fkor STEAMPRESSURE TRANSMITTER                        STEAM GENERATOR STOP VALVE&#xb9;24IRV.240,                          Response Spectra AT THE 647 ELEVATION 18  24IPP-242      0  MAINSTEAM I STEAM GENERATOR              633.00 E M/uN STM STOP ENCL IN THE SOUTHWEST      650.00        1.5 x Bounaeg spectrum vs.              Yes            Yes    Yes OME44 CHANNEL IV REACTOR                        PART OF THE ROOM, 15 FEET SOUTHWEST OF                ROSSSSc  Median Centered Fhor PROTECTION INPUT STEAM                          STEAM GENERATOR STOP VALVE&#xb9;24IRV-240,                        Response Spectra PRESSURE TRANSMITTER                            AT THE 647 ELEVATION Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a license profe sional engineer.)
I~IS 6                                                                                                2J/~AS Printor T pe Name                                Si  a  re                      Date                    Print or T e Name                              Si nature                    Date
 
t) pl
 
Walkdown:              uf 10/18/93                                                            DC CO        .ilT 2                                                                              Page3of6 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. CI  Eqtsp.lo  Rev No.      No Floor Elev.
Base                                          Cap >
Domand7 Ancncr OK7 E~
OK7 24    18    2+PP401      0  CONT/NIMENTVENTI(ATI LOWER      AUXILIARY
                                                                                                                                                  ~
612.00 612 AIRLOCKAREA 10 FT. SE OF THE 612      650.00  N/A  1.5 x Bounding Spectrum vs.      Yos  Yes  Yos    Yes  Yes CONTA!NMENT CHANNEL III                          AIRLOCK, NEAR THE CONTAINMENTWALL,6                    Rearrstic Median Centered Fkxx PRESSURE TRANSMDTER                              FT. ABOVE THE FLOOR                                            Response S      a 25    18    2+PP~        0  CONTAINMENTVENTBATI LOWER        AUXILIARY 612.00 612 AIRLOCKAREA IN THE SOUTHEAST          65000  N/A  14 x            Spea/um vs.            Yes  Yes    Yes CONTA9IMEMTCHANNEL u                              REGION OF THE ROOM, NEAR THE                            Rearrsdc M/xsan Centered  Fkor PRESSURE PROTECTION                              CONTAINMENT WALI 10 FEET EAST OF THE                            Response Spectra TRANSMITTER                                      612 AIRLOCKDOORWAY. 3 FEET ABOVE 26    18    2+PP~        0  CONTAINMENTVENTIIATI LOWER      AUXILIARY 612.00 612 AIRLOCKAREA - IN THE SOUTHEAST                      1.5 x Boundng Spearurn vs.              Yes  Yes    Yos  Yes CONT CHANNEL I PRESSURE                          REGION OF THE ROOM, 1 FOOT SOUTH OF                    Rearndc Median Centered Boor PROTECTION TRANSMITTER                            CPN-96                                                        Response S      a 27    18    24) FA-210    0  REACTOR COO(ANT PUMP I RCP      AUXIUARY  587.00 587 HALLWAY- IN THE SOUTH END OF THE      587.00  Yes  Boundng S pact/um vs. SSE                            Yes SEAL WATER INJECTION To                          HALLWAY,12 FEET EAST OF THE DOORWAY                      Ground Response Specuum REACTOR COOLANT PUMP PP45-1                      TO THE STARTUP BLOWDOWN FLASHTANK LOW FLOW AlARMTRANSMMTER                          ROOM. ON THE SOUTH WALI 28    18    24) FA-220        REACTOR COOIANT PUMP I RCP      AUXIUARY  587.00 587 HAU.WAY IN THE SOUTH END OF THE        587.00  Yes  Boundstg Specuum vs. SSE                Yos          Yes SEAL WATER INJECTION TO                          HALLWAY.15 FEET EAST OF THE DOORWAY                      G/and Response Spectnsn REACTOR COOUWT PUMP PP45-2                        TO THE STARTUP SLOWDOWN FlASHTANK LOW FLOW ALARMTRANSMllTER                        RoohL OMTHESOUTHWAlL, 29    18    2<FA-230      0  REACTOR COOLANT PUMP I RCP      AUXILIARY 587.00 587 HALLWAY IN THE SOUTH END OF THE        587.00  Yes  Boundng Spectrum vs. SSE                Yes  Yes    Yes  Yos SEAL WATER INJECTION TO                          HALLWAY,17 FEET EAST OF THE DOORWAY                      Grcund Response Spectnsn REACTOR Coo(AMT PUMP PP45G                        TO THE STARTUP BLOWDOWMF(ASHTANK LOW FLOW ALARMTRANSMITTER                        ROOM. ON THE SOUTH WALL 30    18    2&FA-240      0  REACTOR COO(ANT PUMP I RCP      AUXILIARY 587.00 587 HALLWAY- IN THE SOUTH END OF THE      587.00  Yes  Bandng Spectrum vs. SSE                Yes  Yos    Yes  Yes SEAL WATER INJECTION TO                          HALLWAY,10 FEET EAST OF THE DOORWAY                      Ground Response Spectrum REACTOR COO(ANT PUMP PP454                        TO THE STARTUP BLOWDOWN FIASHTANK LOW FLOW AlARMTRANSMITTER                        ROOM. ON THE SOUTH WALL 31    18    2&F1-200    0  CHARGING (GVCS) I GVCS          AUXIUARY  587.00 587 HALLWAY IN THE MIDDLE EAST REGION      587.00  Yes  Bandng Spectnsn vs. SSE                              Yes CHARGING PUMPS DISCHARGE                          OF THE HAlLWAY,2 FEET WEST OF THE                        Ground Response Spectrum FLOW INDICATORTRANSMITTER                        RECIPROCATING CHARGING PUMP ROOM REMOVABLEWALL. ON THE 32    18    2<LC451      0  LETDOWN (GVCS) I REACTOR                          609 HALLWAY-15 FEET EAST OF THE SOUTH      609.00  Yes  Boundng Spectrum vs. SSE                Yos          Yes COOlANT LETDOWN VOLUME                            END OF UNIT 1 EAST COMPONENT                            Grawd Response Spectrum CONTROL TANKTK-1 0 EXTREME                        COOUNG WATER HEAT EXCHANGER &#xb9;1+E-HIGH LEVEL CONTROL                                15E, ON THE EAST WALL5 TRANSMITfER 33    18    2&LG452          LETDOWN (GVCS) I REACTOR        Au)0LIARY 609.00 609 HALLWAY-15 F EET EAST OF THE SOUTH                  Boundng Specuum vs. SSE                              Yes  Yos Coo(ANT LETDOWN VOLUME                            END OF UNIT 1 EAST COMPONENT                            Ground Response Spectnsn CONTROL TANKTK-1 0 HIGH LEVEL                    COOUNG WATER HEAT EXCHANGER &#xb9;1&E CONTROL TRANSMITTER                              15E,ONANORTHWAU 6 34    18    2-WDS-703    0  ESSENTIAL SERVICE WAIEAST    SCREENKOUSE  591.00 E ESSNTL SERVWTR PMP RM IN THE            591.00  Yes  Bandng Spect/um vL SSE                  Yes  Yes    Yes  Yos ESSENTIAL SERVICE WATER PUMP                      NORTHWEST REGION OF ROOM, ON THE                        Ground Response Speci/um PP-7E DISCHARGE STRAINER OME-                    WEST WALL 34E HIGH DIFFERENTIAL PRESSURE SWITCH 35    18    2-WDS-704    0  ESSENTIAL SERVICE WAIWEST    SGREENHOUSE  591.00 W ESSNTL SERV WIR PMP RM - ON THE EAST    591.00  Yes  Bandng Specuum vs. SSE            Yes                Yes  Yes ESSENTIAL SERVICE WATER PUMP                      WAU IN THE NORTH END OF THE ROOM                        Grand Response S pectnsn 99-7W DISCHARGE STRAINER OME-34W HIGH DIFFERENTIAL PRESSURE SWITCH Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SR%) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                                i    ture                      Date                    Print or T pe Name z.Q Si nature              Date
 
I c
 
Walkdown:                f 10/16/93                                                            DCCO              .T2                                                                                    age 4 of 6 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Ci  Equip.io    Rev      System/Eqtspment D scltpdon              Fker              Roonl or Row/Coasnn            Base                Capacrty vs.          Cap >    Caves ts No.        No                                                Elev.                                            Bev.
Eral Demand Basis          Demand?    OK?      OK?              OK?
36      18  2-WPS-702      0  ESSENTIAL SERVICE WA/EAST                    569.00 ESSNTL SERV WTR PIPE TUNN W THE          591.00  Yes  Bourxttng Spectnsn vs. SSE      Yes                Yes              Yes ESSENTIAL SERVICE WATER                            MIDDLEREGION OF THE ROOM, ON THE EAST                  Ground Response Spect/urn SUPPLY HEADER PRESSURE                              WALL SWITCH 37      18  2-WPS-706      0  ESSENTIAL SERVICE WA/WEST          TURBINE  569.00 ESSNTL SERV WTR PIPE TUNN W THE          591.00  Yes  Boundrng Specuum vs. SSE        Yes      Yes                Yes    Y8$
ESSENTIAL SEIMCE WATER                              MIDDLEREGION OF THE ROOM. ON THE EAST                  Ground Respor>>e Spectrum SUPPLY HEADER PRESSURE                              WALL SWITCH 38    19    24'TROIS      0  COMPONENT COOUNGWA/EAST                      609.00 609 HALLWAY-1 FOOT EAST OF THE NORTH                  Bounc4rg Spect/um vs. SSE                Yes                Yes    Yes COMPONENT COOUNG WATER                              END OF EAST COMPONENT COOUNG WATER                    Ground Response S pecuum HEAT EXCHANGER HE.1 SE CCW                          HEAT EXCHANGER &#xb9;24IE-I 5E, 7 FEET ABOVE OUTLET TEMPERATURE                                  THE FLOOR RECORDER THERMALSENSOR 39    19    2<TR<25        0  COMPONENT COOUNG WA/WEST                    609.00 609 HALLWAY-1 FOOT EAST OF THE NORTH      609.00  Yes  Boulxtstg Spectrum vs. SSE COMPONENT COOUNG WATER                                                                                                                    Yes END OF WEST COMPONENT COOUNG WATER                    Ground Response Spectrum HEAT EXCHANGER CCW OUTLET                          HEAT EXCHANGER &#xb9;24IE-1 SW, 7 FEET ABOVE TEMPERATURE RECORDER                                THE FLOOR THERMALSENSOR 40    19    24TR 435          RESIDUAL HEAT REMOVA /            AUXILIARY 609 00 E RHR HEAT XCHGR RM-3 FEET FROM THE      609.00  Yes  Boundrtg Spectrum vs. SSE                Yes RESIDUAL HEAT REMOVALTO                            SOUTH END OF THE ROOM, UNDER THE                      Ground Response Spectrum REAGT0R coolANT Loops &#xb9;2 6                          GRATWG, 3 FEET ABOVE THE FLOOR
                                &#xb9;3 COLD LEGS TEMPERATURE RECORDERTHERMALSENSOR 41    19    2-VTS-201      0  TURBINE BUILDINGVEN/EAST            TURBINE  591.00 E MTR DRIV AUX FEEDWTR PMP 8 F EET        591.00  Yes  Boulxtstg Spectrum vs. SSE      Yes      Yes MOTOR DRIVEN AUXIUARY                              SOUTHWEST OF EAST MOTOR DRIVEN                        Ground Response Spectnsn FEEDWATER PUMP ROOM                                AUXILIARYFEEDWATER PUMP 2+P4E, ON EXHAUST FAN HVJLFP44 1                              WEST WALL 42    19    2-VTS-203      0  TURBINE BUILDWGVEN/TURBWE          TURBWE  591.00 TB DRIVEN AUXFDWTR PMP - W SOUTHEAST      591.00  Yes  Bourx4rg Spectrum vs. SSE      Yes      Yes                Yes DRIVEN AUXILIARYFEED PUMP                          REGION OF ROOM, 6 FEET SOUTH OF                        Ground Response Spectrum ROOM NORTH EXHAUST FAN HV-                          TURBINE DRIVEN AUXILIARYFEED PUMP 2+P-AFP-T1                                              4 43    19    2-V?&204      0  TURBINE BUILDINGVEN / TURBWE        TURBWE  591.00 TB DRIVEN AVXFDWTR PMP - IN NORTHEAST    591.00  Yos  Boundstg Specuum vs. SSE                                    Yes DRIVEN AUXILIARYFEED PUMP                          REGION OF ROOM. 8 FEET NORTH OF                        Grand Response Spectrum ROOM SOUTH EXHAUST FAN HV                          TURBINE DRIVEN AUXILIARYFEED PUMP 2+P-AFP T2                                              4 44    19    2-vrS-206      0  TURBINE BUILDINGVEN /WEST          TURBINE  591.00 WMTRDRIVENAUXFOWTRPMP IN                  591.00  Yes  Boundstg Spearum vs. SSE        Yes      Yes      N/A      Yes MOTOR DRIVEN AUXILIARY                              NORTHWEST CORNER OF ROOM, ON SOUTH                    Ground Response Spectrum FEEDWATER PUMP ROOM WEST                            WALI 5 FEET ABOVE THE FLOOR EXHAUST FAN HV~P~
45    19    2.VT$ 440      0  DIESELROOMVENTILAT/AB              GROUNDS  60900  REFUEL WTR STOR TANKAREA -50 FEET        587.00  Yes  Bouncing Spectrum vs. SSE      Yes                          Yes    Yes EMERGENCY DIESEL GENERATOR                          NORTHWEST OF REFUEUNG WATER                            Ground Response Spectrum ROOM VENTILATIONSUPPLY FAN
                                                                                                                                            ~
STORAGE TANK&#xb9;2-TK43. ACCESSIBLE FROM HV4?GS-2 OUTSIDE AIR                                A MANHOLENEAR THE 609 ELEVATIONAIR THERMOSTAT                                          INTAKE 46    19    2-VT$ 445      0  DIESEL ROOM VENTILAT/CD                      596.00 RCTR CABLE TUNN, QUAD 3- IN THE MIDDLE    587.00  Yes            Specuum vs. SSE      Yes                          Yes EMERGENCY DIESEL GENERATOR                          WEST REGION OF THE ROOM. 5 FEET NORTH                  Ground Respor>>e Spectrum ROOM VENTRATIONSUPPLY FAN                          OF REACTOR CABLE TUNNEL QUAD &#xb9;3 HV4?GS-1 OUTSIDE AIR                                MIDDLE/NORTHSECTION FIRE DOOR THERMOSTAT CerUfication:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
                                                                                          )2    ZO                                                                                              /2//4/yS Printor T pe Name                                    Si  a  re                      Date                    Printor T pe Name                            Si nature                        Date
 
Waikdown:            . of 10/18/93                                                            DC CO        rIIT 2                                                                            Page5of6 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. CI  Equp.lD    Rev      System/Equsrment Doscnpten              Floor              Room or Row/Cohmn                Base                Capacay vs.          Cap >  Caveats        Interact No.      No                                              Elsv.                                                Elev.              Oomard Basis        Demand?  OK7    OK?      OK?    OK?
47    19    2-VTS450    0  AUXILIARYBUILDWGV / CONTROL                        INVERTER AREA - IN THE SOUTHEAST REGION                    Boundeg Specbum vs. SSE            Yes ROD DRIVE EQUIP ROOM AND INV                      OF THE ROOM, 12 FEET NORTHEAST OF THE                      Grourd Response Spectrum AREA VENT NORTH SUPPI.Y FAN                        RoolES ACCESS DOOR, ON THE EAST WAU HV4GRS-1A TEMPERATURE                              4 FEET ABOVETHE SWITCH 48    19    2-VT9451    0  AVXIUARYBUILDWGV/ CONTROL      AUXILIARY          CRO EQUIP RM - IN THE SOUTHVVEST CORNER      609.00  Yes  Bandeg Spocbum vs. SSE    Yos    Yes            Yes    Yes ROD DRIVE EQUIP ROOM AMD INV                      OF THE ROOM, ON THE WEST WALISFEET                        Grourd Response Spectrum AREA VENT NORTH SVPPI.Y FAN                        ABOVE THE FLOOR HV4GRS-1A TEMPERATURE SWITCH 4S      19    2-V16452    0  AUXILIARYBUILDINGV/4KVROOM      AUXILIARY          4KVRM 600V SWGRAREA-IN THE                  609.00        Boundeg Specbum vs. SSE      Yes    Yes            Yes    Yos 600 VOLT SWITCHGEAR XFRMS                          NORTHWEST REGION OF THE ROOLL 20 FEET                      Grand Response Spectrum TR21 B AND TR21D AREA  VENT                      NORTHWEST OF 600VAC SUPPLY SUPPLY FANHV4GRS-7                                TRANSFORMER &#xb9;2.TR21A, ON THE WEST TEMPERATURE SWITCH                                WALL5 FFET 50      19    2-VT6453    0  AUXILIARYBUILDWGV/600VAC        AUXILIARY  613.00  4KV ROOM MEZZANINEAREA IN THE                609.00        Boundeg Spectrum va SSE      Yes    Yes  N/A      Yos    Yes MOTOR CONTROL CENTER                              MIDDLEWEST REGION OF THE ROOM. 20                          Ground Response Spectrum MEZZANINEAREA VENT SUPPLY                          FEET NORTH OF THE SOUTH ACCESS STAIRS, FAN HV4GRS-9 TEMPERATURE                          ON THE WESTWALI 5FEETABOVE THE SWITCH 51    19    2-VTS454    0  AUXIUARYBUILDINGV/ CTRL ROD      AUXILIARY        WVERTER AREA IN THE SOUTHWEST                        Yos  Boundeg Specbum vs. SSE      Yes    Yes                  Yos DRV EQUIP ROOM AND WVAREA                          REGION OF THE ROOM, 8 FEET NORTHWEST                      Ground Response Spectrum VENT OUTSIDE AIR WLET DAMPER                      OF THE ROOM'S ENTRANCE DOOR. ON THE ITV4GR4lD4 TEMPERATURE                            WEST WALI 4 FEET ABOVETHE SWITCH 52    19    2-VTS455      0                        l AUXILIARYBUILDING V CTRL ROD    AVXIUARY          INVERTER AREA IN THE SOUTHEAST REGION        609.00  Yos  Boundeg Spocbum vs. SSE      Yos    Yes            Yes    Yes DRIVE EQUIP ROOM AND INVAREA                      OF THE ROOM, 12 FEET NORTHEAST OF THE                      Ground Response Spectrum VENT RECIRC AIR WLET DAMPER                        ROOM'S ACCESS DOOR, ON THE EAST WAU HV4GR4/ID-1 TEMPERATURE                            4 FEET ABOVE THE SWITCH 53      19    2-VTS456      0  AUXILIARYBUILDINGV/CRD          AUXILIARY          WVERTER AREA W SOUTHWEST REGION OF          609.00        Boundeg Specbum vs. SSE              Yos            Yos    Yos EQVIPMEMT ROOM AND WVERTER                          ROOM, 8 FEET NORTHWEST OF THE                            Grourd Response Spectrum AREA  VENTIIA'TION  NORTH                          ENTRANCE DOOR, ON WEST WAUS FEET SUPPLY FAN HV4GRB4A TEMP                          ABOVE SWITCH 54      19    2.VT9457      0  AUXILIARYBUILDWGVlCTRL ROD      AUXILIARY          CRD EQUIP RM - W THE SOUTHEAST REGION      609.00  Yos  Bandeg S pecbum vs. SSE      Yes    Yes            Yes  Yes DRIVE EQUIP ROOM AND INVAREA                        OF THE ROOM. 10 FEET EAST OF THE ROOLrS                  Grand Response Spectrum VEMTILATIOMSOUTH SUPPLY FAN                        ENTRANCE DOOR. ON THE SOUTH WALL.4 HV4GRS4A TEMPERATURE                                FEET ABOVE THE SWITCH 55      19    2-VTS-702    0  SCREENHOUSE VENTILAT / UNIT 2 SCREENHOUSE  591.00  E ESSM1L SERVWTR PMP RM-ON EAST            591.00        Boundeg Spectrum vs. SSE            Yes            Yes  Yos EAST ESW PUMP ROOM                                  WALL9 FE'ET NORTHEAST OF EAST                            Ground Response Specbum TEMPERATURE SWITCH                                  ESSENTIAL SERVICE WATER PUMP    1 PP-?E, 8 FEETABOVE FLOOR 56      'IS  2-VTS-704    0  SCREENHOUSE VENTILATl UNIT 2 SCREENHOUSE    591.00  WESSNTLSERVWTRPMPRM 3FEET                    591.00  Yes  Bandeg Spectrum vs. SSE              Yes            Yes WEST ESW PUMP ROOM                                  SOUTH OF WEST ESW PUMP 2+P.?W, ON THE                    Grasd Response Spectrum TEMPERATURE SWITCH                                  SOUTH WALL6 FEET ASOVE THE FLOOR 57      19    2-V16 402        AUXIUARYBUILDING V l 4KV ROOM                      4KV RM - AB 4KV SWGR AREA                            Yos  Boundeg Spocburn vs. SSE            Yes            Yes    Yes AB 4KV SWITCHGEAR AREA                                                                                        Grand Response S pecbum VENTILATIONSUPPLY FAN HV-SGRS.2 THERMALSENSOR Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conctusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
                                                                                          /~ u                                                                                              IZ.//'I' 9<
Print or T pe Name                              i    ture                        Date                      Print or T pe Name                          Si nature                    Date
 
Walkdown:            if 10/18/93                                                        DCC            .IT2                                                                                .iage 6 of 6.
SCREENING VERIFICA            N DATA SHEET (SVDS)
Eq. CI  Equip.to  Rev                                                            Room or Raw/Cotumn                                                                                          Eqtsp No.      No                                                                                                                                                        OK?              OK?
58    19    2-V1 6403    0  AUXtLIARYBUILDINGV/4KVROOM    AUXILIARY  609.00 4KV RM CD 4KV SWOR AREA                                Boundeg Spectrum vs. SSE            Yes      N/A              Yes CD 4KV SWITCHGEAR AREA                                                                                  Ground Response Spectrum VENTltATIONSUPPLY FAN Hv-SGRSG THERMALSENSOR 59    19    2-Vrs4KS      0  AUXIUARYBUILDtNGV/4KV  ROOM  AUXILIARY  613.00 4KV ROOM - MEZZANINEAREA IN THE                        Boundstg Spectrum vs. SSE    Yes    Yes                      Yes 600V SWGR XFMRS TR21B AND                      MIDDLEWEST REGION OF THE ROOI/L 25                      Ground Response S pecuum TR21D AREA VENT SUPPLY FAN                      FEET NORTH OF THE ENTRANCE STAIRS, ON HVCGRS-7 TEMP SWITCH                            THF WEST WALI 5 FEET ABOVE%HE FLOOR THERMALSENSOR 60    19    2-V16408      0  AUXILIARYBUILDINGV/4KVROOM    AUXILIARY  609.00 4KV RM 600V SWGR AREA - IN THE                          Boundrtg Spectrum vs. SSE    Yes    Yes                      Yes 600V SWGR XFMRS TR21A AND                      NORTHWEST REGION OF THE ROOM, 20 FEET                  Gmund Response Spectrum TR21C AREA VENT SUPPLY FAN                      NORTHWEST OF 600V BUS SUPPLY HVCGRS4I TEMP SWITCH TEMP                      TRANSFORMER St2-TR21A, ON THE WEST SWITCH                                          WALL, Certification:
All the information contained on this Screening VeNication Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
S'e                                                                                                                          /zla hs Printor T e Name                                                                ate                  Print or T pe Name                            Si nature                      Date
 
Walkdown.            of 10/25/93                                                                          DC CC        .4IT 2                                                                              Page    1 of SCREENING VERIFICATION DATA SHEET (SVDS) 2'q.
Cl  Equip.lD  Rev    System/Eqtipm ant Descnptron                Buiklng. Fker              Room or Row/Co4mn No.                                                                                                                                          Capacrty vs.        Cap a  Caveats  hncnor    Interact  Equar No                                                            Ekrv.                                                              Demand Baas        Demand?  OK?      OK?      OK?      OK?
20      2%11      0  EQUIPMENT CONTROL AN I                        AUXILIARY  633.00 CONTROL ROOM IN THE NORTHEAST                          Basdng Spectrum vs. SSE                                            Yes AUXILIARYRElAYPANEL A11                                        CORNER OF THE ROOM                                    Ground Response S 20      2%13      0  EQUIPMENT CONTROL AN I                        AUXILIARY  633.00 CONTROL ROOM IN THE SOUTHEAST            633.00  Yes  BouidsXI Spect/um vs. SSE    Yes              Yes      Yes      Yes AUXILIARYRE lAYPANEL A1 3                                      CORNER OF THE ROOM                                    Grand Response S 20    2~-2        0  120V/220 CONTROL ANO I                                          CONTROL ROOM IN THE SOUTHWEST                          Basdeg Spec/rum vs. SSE                                  Yes      Yes REACTOR PROTECTION TRAIN                                        REGION OF THE ROOM, ON THE REAR SIDE                  Grasxl Response Spectnsn RElAY CABINET&#xb9;2      'A'UXILIARY OF MAINFEED PUMPS CONTROL PANEL &#xb9;2+P 20    2~8-2        0  120V/220 CONTROL AND I                        AUXILIARY  633.00 CONTROL ROOM IN THE MIDDLENORTH                        Bourxang Spearum vs. SSE            Yes                Yes      Yes REACTOR PROTECTION TRAIN                                        REGION OF THE ROOM, INSIDE RADIATION                  Greed Response Spect/urn RElAYCABINET&#xb9;2      'B'IBOLIARY MONITORING SYSTEM RACK I PANEL &#xb9;24V/IS4 0  BORON MAKEUP (GVCS) I BORIC                                    CONTROL ROOM - IN THE SOUTHEAST AREA                  Bouldstg Spectrum vs. SSE ACID CHARGING AND LETDOWN                                      OF THE ROOM, 15 FEET SOUTHEAST OF THE                  Ground Response Spectrum CONTROL PANEL                                                  UNff SUPERVISORS DESK 0  EQUIPMENT CONTROL AMI                        AUXILIARY  633.00 CONTROL ROOM - IN THE MIDDLENORTH                      Basdrng Spectrum vs. SSE                                Yes      Yes REACTOR PROTECTION CONTROL                                      REGION OF THE ROOM, NEAR THE NORTH                    Ground Response S pact/um INPUT CABINET &#xb9;26                                              WALI SFEETEASTOFVNIT1HOT SHUTDOWN PANEL &#xb9;14ISDt ENCLOSURE 20      2<I-27      0  EQUIPMENT CONTROL AN I                        AUXILIARY  633.00 CONTROL ROOM - N THE MIDDLENORTH                      Basdstg Spectrum vs. SSE                                          Yes REACTOR PROTECTION CONTROL                                      REGION OF THE ROOM, NEAR THE NORTH                    Ground Response Spectrum INPUT CABINET &#xb9;27                                              WALI BFEETEASTOFUNIT1HOT SHUTDOWN PANEL &#xb9;1+SDI ENCLOSURE 20      2CP        0  CONDENSATE I CONDENSATE                      AUXILIARY  633.00 CONTROL ROOM IN THE SOUTHWEST AREA                    Baurdng Speci/um vs. SSE PUMP CONTROL PANEL                                                                                                                                                                        Yes OF 1HE ROOM, 15 FEET SOUTHWEST OF THE                  Grourxl Response Spectnsn UNIT SUPERVISORS DESK 20      2+TV        0  TURBINE INSTRUMENTATI DELTA                  AUXILIARY  633.00 CONTROL ROOM IN THE SOUTH AREA OF                      Bardng Spectrum vs. SSE
                              'F AND UNIT CONTROL PANEL                                                                                                                            Yes              Yes      Yes      Yes THE ROOM. 15 FEET SOUTH OF THE UNIT                    Grcund Response Spectrum SUPERVLSO/rs DESK 10    20    2+IS D2      0  SAFETY NJEGTION I UNIT 2 HOT                  AUXIUARY  633.00 CONTROL ROOM N THE SOUTHWEST              633.00  Yes  Bourdsrg Speci/urn vs. SSE                    Yes                Yes SHUTDOWN PANEL                                                  CORNER OF THE ROOM                                    Graed Response    S 20      2&IS-I      0  EQUIPMENT CONTROL AN I                        AUXILIARY  633.00 CONTROL ROOM - IN THE MIDDLE EAST PART    633.00  Yes  Bounc4ng Spectrum vs. SSE            Yes                Yes      Yes NUCLEAR INSTRUMEMTATIOM                                          OF THE ROOM, 25 FEET NORTHEAST OF THE                  Ground Response Spectnsn SYSTEM PROTECTION CHANNEL I                                      UNIT SUPERVISORS DESK CONTROL PANEL 12    20    2&IS-lit    0  EQUIPMENT CONTROL AN I                        AUXILIARY  633.00 CONTROL ROOM - IN THE MIDDLEEAST PART    633.00  Yes NUCLEAR INSTRUMENTATIOM sousing Spectnsn vs. SSE            Yes      Yes      Yes      Yes OF THE ROOM, 22 FEET NORTHEAST OF THE                  Grourd Respcnse Spectrum SYSTEM PROTECTION CHANNEL III                                    UNIT SUPERVISOR'S DESK CONTROL PANEL 13          2+RI-21      0  NUCLEAR INSTRUMENTATI                                            CONTROL ROOM -ON MIDDLE EAST WALl                      Boundng Spectrum vs. SSE
            'PRCSR                                                                                                                                                                        Yes                          Yes NUCLEAR INSTRUMENTATION                                          NEAR REAR OF ESW CONTROL PANEL &#xb9;2                      Ground Response Spectrum WIDE RANGE SIGNAL PROCESSOR                                      ESW, ON N-21 N CABINET 14                        0  PRESSURIZER I PRESSURIZER                      AVXILIARY  633.00 CONTROL ROOM - IN THE SOUTHEAST PART                  Basdng Spectrum vs. SSE                      Yes                  Yes CONTROL PANEL                                                    OF THE ROOLL 15 FEET SOUTHEAST OF THE                  Ground Response Spectrum UNIT SUPERVISORS DESK 15    20      2&c        0  ROD CONTROL AND INST I                        AUXIUARY  633.00 CONTROL ROOM - IN THE SOUTH PART OF                    Boundng Spectrum vs. SSE REACTOR CONTROL RODS                                                                                                                                                                      Yes THE ROOM. 15 FEET SOUTH OF THE UNIT                    Grourxl Response Spectrum CONTROL PANEL                                                    SUPERVISORS DESK Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
Print or Type Name                                            Sign  ure gg    /tv/+~
Date                    Print or Type Name                            n  ure                      Date
 
Walkdown:      tp        10/25/93                                                              DC CO          IT 2                                                                            Page 2 of 2 SCREENING VERIF iCATILINDATA SHEET (SVDS)
Eq. CI    Equo.ID  Rev    System/Eqrspment Descrtptron      Buadng. Floor            Room or Row/Column            Base                Capacsy vs.                Csv eats                  Eqtsp No. No                                                Elev.                                          Eisv.              Demand Basis                  OIQ      DKr            OKV 16              2&CP    0  REACTOR COOLANT I REACTOR          AUXILIARY  633.00 CONTROL ROOM - IN THE SOUTHEAST PART              Yos  Boundng Specaum vs. SSE      Yos    Yes      Yos    Yes    Yes COOLANT PUMP CONTROL PANEL                          OF THE ROOM. 15 FEET SOUTHEAST OF THE                  Ground Response Spectrum UNIT SUPERVISORS DESK 2&PSA    0  REACTOR PROTECTION    I  REACTOR              633.00 CONTROL ROOM - IN THE SOUTHWEST                  Yes  Boundstg Spectrum vs. SSE    Yes            Yos            No PROTECTION AND SAFEGUARD                            REGION OF THE ROOM. IN FRONT OF THE                    Ground Rasped>>o Speci/um ACTUATIONTRAIN 'A'ABINET                            CONTROL ROOM SOUTHWEST REAR RACK 16              2+P&8    0  REACTOR PROTECTION /REACTOR        AUXILIARY  633.00 CONTROL ROOM - IN THE NORTHEAST                  Yos  Boundng Spectnsn vs. SSE      Yes    Y8$      Yos PROTECTION AND SAFEGUARD                            REGION OF THE ROOM, ON THE REAR SIDE                  Ground Response Spectrum ACTUATIONTRAIN 'B'ABINET                            OF MOVABLEINCORE INSTRUMENTATION PANEL &#xb9;24hFX 19            24tPSX-A  0  REACTOR PROTECTION  I  REACTOR    AUXILIARY  633.00 CONTROL ROOM IN THE SOUTHWEST                    Yos  Boundng Spect/um vs. SSE            No      Yes            No PROTECTION AND SAFEGUARD                            CORNER OF THE ROOM, ON THE REAR SIDE                  Ground Response Spectnm ACTUATIONTRAIN A AUXILIARY                          OF CONDENSATE PUMP CONTROL CABINET 24tpsx4r  0  REACTOR PROTECTION I REACTOR      AUXILIARY  633.00 CONTROL ROOM IN THE MIDDLE                        Yos  Boundrng Spectrum vs SSE      Yos    No      Y8$            No PROTECTION AND SAFEGUARD                            SOUTHWEST REGION OF THE ROOM, ON THE                  Ground Response Spectrum ACTUATIONTRAIN B AUXILIARY                          REAR SIDE OF MOVABLEINCORE CABINET 21                        0  ELECTRICAL OISTRIBUT I STATION      AUXILIARY 633.00 CONTROL ROOM - IN THE NORTHWEST PART              Yos  Boundng Spectrum vs. SSE                      Y8$ ~          Yes ALDVLIARIEBcoNTRQL pANEL                            OF THE ROOM. 22 FEET NORTHWEST OF THE                  Grand Response Spectrum UNIT SUPERVISORS DESK 2<G    0  STEAM GENERATION I STEAM            AUXILIARY 633.00 CONTROL ROOM - IN THE SOUTHWEST PART              Yos  Boundng Spectrum vs. SSE                      Yes      Yes GENERATOR AND AUXILIARYFEED                          OF THE ROOM, 15 FEET SOUTHWEST OF THE                  Ground Response Speci/um PUMP CONTROL PANEL                                  UNIT SUPERVISORS DESK 0  COMPONENT COOLING WATER I          AUXILIARY 633.00 CONTROL ROOM                                      Y8$  Boundng Spectrum vs. SSE      Yes    Yes      Yos      Yes    Yos COMPONENT COOLING WATER                                                                                    G/and Response Spoct/um CONTROL PANEL 24              2<SW    0  ESSENTutL SERVICE WATER I          AUXILIARY 633.00 CONTROL PANEL                                    Yes  Boundrng Spectrum vs. SSE    Yos    Yos      Yos      Yos    Yes ESSENTIAL SERVICE WATER                                                                                    Ground Response Spectrum CONTROL PANEL 25                        0  NUCLEAR INSTRUMENTATIONI            AUXILIARY 633 00 CONTROL ROOM                                      Yos  Boundstg Spect/um vs. SSE    Yes    Y8$      Yos FLUX CONTROL PANEL                                                                                          Ground Re        S CertTiication:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
lK//a 'Q Print or Type Name                                Signature                      Date  ~
Print or T pe Name                          Si n tur                    Date
 
Walkdown:            of 10/25/93                                                            DC CO          <IT 2                                                                                  Page1of2 SCREENING VERIFICATI N DATA SHEET (SVDS)
Iten  Eq. Cl  Equip.lD  Rev    System/Eqtspmant Deccriptlon              Floor            Room or Raw/Column No.
Capacsy vs.          Cap>>    Caveats                      Equat No                                              Bev.                                                                  noma/xi Basis        Demaxl?  OK?        OK?              OK?
2+CRA-1      0  EQUIPMENT CONTROL AN I                      650.00 CTRL RM AIR CONDIT RM AT THE CENTER OF      650.00        1.5 x Boundng Spectrum vs. Yas                Yos      Yes      YO5 CONTROL ROOM AIR HANDLING                          THE NORTH WALL4 FEET NORTH OF                            Res<<sac Median Cantered Fkor SUBPANEL&#xb9;I                                        CONTROL ROOM      VENTILATIONNORTH AIR                        Response Spectra CONDmoNING UNIT &#xb9;24IV~RA-1 2*CRA-2      0  EQUIPMENT CONTROL AN I            AUXILIARY 650.00 CTRL RM AIR COND IT RM AT THE CENTER OF    650.00        1.5 x Bounang Spectrum vs. Yes      YO5    < Yes      Yas      YO5 CONTROL ROOM AIR HANDLING                          THE SOUTH WALI4FEET SOUTH OF                            ROSMc Metr/an Cantered Fker SUB PANEL &#xb9;2                                      CONTROL ROOM      VENlllATIONSOUTH AIR                        Response Spectra CONDmONING UNIT &#xb9;24IVACRA-2 0  CONTAINMENTVENTIIATI              AUXILIARY 633.00 633 HALLWAY- IN THE SOUTH END OF THE        633.00        1.5 x Bounang Spectrum vs.                        Yes      Yes      Yos CONTANMENTAUXIUARIES                              HALLWAY.10 FEET NORTHWEST OF THE AUX                    ROSMc Mtxrran Cantered Favor SUBPANEL          Tlo                            BUILDINGVENTILATION                                            Re        S 2M41      0  STEAM GENERATING I STEAM          AUXILIARY 612.00 E MAINSTM STOP ENCL - IN THE NORTHEAST      633.00        Bounding Spectrum vs. SSE    Yas      Yes      Yes      Yes      Yas GENERATORS <<I AND &#xb9;4 LOCAL                        CORNER OF THE ROOM, 8 FEET WEST OF THE                    Ground Response Spoct/um SHUTDOWN STATION                                  DOUBLE DOORS 24842      0  STEAM GENERATNGI STEAM            AUXILIARY 591.00 STARTUP BLOWDOWN FLASHTANKRM N                            Boundng Spect/um vs. SSE      Yes      Yas                Yes      Yes GENERATORS &#xb9;2 AND &#xb9;3 LOCAL                        THE SOUTHWEST CORNER OF THE ROOM. S                      Ground Response Spectrum SHUTDOWN STATION                                  SOUTHEAST OF THE STORAGE TANKPIPE TUNNEL NEAR THE SOUTH WALI 5 FEET ABOVE THE FLOOR 6    20      24SIG      0  PRESSURIZER I REACTOR            AUXILIARY 587.00 587 HALLWAY IN MIDDLEE REGION OF THE        587.00  Yes    Boundng Spectrum vs. SSE      Yos      Yes      Yas COOLANT SYSTEM CHARGNG AND                        HALLWAY,10'OUTH OF 15GPM RADIOACTIVE                      Ground Response Spectrum LETDOWN LOCAL SHUTDOWN                            WASTE EVAP. SUB PANEL <<124tWE-1 5, ON THE STATION                                            S WALL3'BOVE THE FLOOR 2451<      0  EQUIPMENT CONTROL AN I            AUXILIARY 587.00 587 HALLWAY- IN THE MIDDLE EAST REGION                    Bounang Specuum vs. SSE REACTOR COOUWT SYSTEM Yos      Yes      Yes OF THE HALLWAY,2 FEET SOUTH OF 15 GPM                    Grourxl Response Spectrum TEMPERATURES AND STEAM
                                                                                                                                          ~
RADIOACTIVERAD WASTE EVAP SVBPANEL GENERATORS LOCAL                                  <<124IWE-15, ON THE WEST WALL SHUTDOWN STATION 24.845      0  EQUIPMENl'ONTROLAN I                        612.00 E MANSTM STOP ENCL - IN THE NORTHEAST      609.00  Yes            Spectrum vs. SSE    Yos                Yes      Yas REACTOR COOUWT LOOPS <<1                            CORNER OF THE RO04L 10 FEET WEST OF                      Ground Response Spectrum AND &#xb9;4 TEMPERATURES, SGS &#xb9;1                        THE DOUBLE DOORS AND &#xb9;4 PRESSURES LOCAL SHUrDOWN STAlloN 24.SI4XX    0  EQUIPMENT CONTROL AN I LOCAL      AUXILIARY 598.00 RGTR CABLE TUNN, QUAD 1  - IN THE                  Yas  Bounang Spectrum vs. SSE                Yes      YO5      Yes    Yes SHUTDOWN STATION SXX                              SOUTHWEST REGION OF THE ROOM, NEAR                        Ground Response Spectrum THECONTANMENTWALI 8 FEETWESTOF DOOR &#xb9;24IR4EUX334 ON THE SOUTH WALI4 FEET UP 10    20    24.546      0  EQUIPMENT CONTROL AN I                      591.00 STARTUP SLOWDOWN FLASHTANKRM IN                          1.5 x Bounang S pact/um vs. Yes      Yas      Yes      Yes REACTOR COOUWT LOOPS &#xb9;2                            THE SOUTHWEST CORNER OF THE ROOM, 1                      Re@istic Median Centered Fkor AND 53 TEMPERATURES, SGS &#xb9;2                        FOOT WEST OF LOCAL SHUTDOWN STATION                            Response Spectra AND &#xb9;3 PRESSURES LOCAL                            &#xb9;24S42,NEAR?HE SOUTHWALI 5FEET SHUTDOWN STAllON                                  ABOVE 11    20                0  EQUIPMENT CONTROL AN I LOCAL      AUXILIARY 596.00 RCTR CABLE TUNN, QUAD 3- IN THE MIDDLE              Yos  Bourxing Spectrum vs. SSE      Yas      Yas      Yes      Yos SHUTDOWN STATION 6XX                              OF THE ROOM. ON THE SOUTH WALL                            Ground Res        Spectrum 12    20    24RI    0  NUCLEAR INSTRVMENTATI                      596.00 RGTR CABLE TUNN, QUAD 1 -20 FEET                          1.5 x Bounang spectrum vs. Yos      Yes      Yes      Yes    Yes AMP          NUCLEAR INSTRUMENTATION                            SOUTHWEST OF REACTOR CABLE TUNNEL                        ROSMc Mtxsan Centered Floor WIDE RANGE RADIATION                              QUADRANT&#xb9;1, NORTH OF FIREDOOR 14? R-                          Response Spectra AMPUFIER CABINET                                  AUX333 CerUfication:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                                i nature                      Date                      Print or T pe Name                                    re
                                                                                                                                                                                                      ~    gg Date
 
'C Walkdown:            . of 10/25/93                                                          DC CO( .      <<IT 2                                                                                Page 2 of 2 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. CI  Equp.lo            System/Eqcapment escnptcn              Fker            Room or Rowrcotumn                                                          Cap >  Caveats                Equ<<t Na                                                      Elev.                                                                                        Demand?  OK?    OK?            OK?
13            24<<RI    0  NUCLEAR INSTRUMENTATI          AUXILIARY 596.00  RCTR CABLE TUNN, QUAD 1 IN THE                  Yes    Boundrtg Spectntm vs. SSE      Yes      Yes  Yes      Yes    Yes AMP            NUCLEAR INSTRUMENTATION                          SOUTHEAST REGION OF THE ROOM. 25 FEET                    Ground Response Spectrum SOURCE RANGE RADIATION                          EAST SOUTHEAST OF THE RoohrS DETECTOR Ntu-23 AMPLIFIER                        ENTRANCE DOOR, NEAR THE CONTAINMENT CABNET                                          WALI 3 14            2+RI.23-    0  NUCLEAR INSTRUMENTATI          AUXILIARY 596.00  RCTR CABLE TUNN, QUAD 1 IN THE                          Bcundstg Spectrum vs. SSE      Yes      Yes ISOL          NUCLEAR INSTRUMENTATION                          SOUTHFAST REGION OF THE ROOM,25 FEET                    Ground Response Spectrum SOURCE RANGE SIGNAL ISOlATOR                    EAST SOUTHEAST OF THE ROOM'S CABINET                                          ENTRANCE DOOR, NEAR THE CONTAINMENT WALL 15            2&RI    0  NUCLEAR INSTRUMENTATI                    596.00  RCTR CABLE TUNN, QUAD 1 IN THE                  Yes    Bouncsng Spectrum vs. SSE      Yes      Yes            Yes    Yes PRCSR          NUCLEAR INSTRUMENTATION                          SOUTHEAST REGiON OF THE ROOM. 25 FEET                    Ground Response Spectrum SOURCE RANGE SIGNAl                              EAST SOUTHEAST OF THE ROOM'S PROCESSORCABNET                                  ENTRANCE DOOR, NEAR THE CONTAINMENT WALL 16    20      2<CP      0 ~ NUCLEAR SAMPLING I NUCLEAR    AUXIUARY  581.00 NUCLEAR SAMPLING RM - IN THE MIDDLEOF                    1.5 x Boundrtg Spectnsn vs. Yes      Yes            Yes    Yes SAMPLING SYSTEM CONTROL                          THE ROOM, 10 FEET SOUTHEAST OF THE                      Reassdc Median Centered  Fker PANEL                                            NUCLEAR SAMPLE SINK $ 12&C32                                  Response S      a 20      2.TFP      0  EQUIPMENT CONTROL AN I          TURBINE  5SI.OO TB DRIVEN AVXFOWTR PMP - 3 FEET                          1.5 x Boundrtg Spectnsn vs.
TURBINE DRIVEN AUX FEED PUMP                    NORTHEAST OF TDAFP $2+PA, ON THE fAST                  Rearsdc Mecsan Centered  Floor SVBPANEL                                        WALI1FOOT NORTH OF THE ROOM'S                                Response Spectra ENTRANCE DOOR Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
iZ/(4 /+1                                                                                                Iww fg Print or T pe Name                            Si nature                        Date                  Print or Type Name                                    a ure                  Date
 
Walkdown.. of 10/04/93                                                                      DC C          .<IT 2                                                                              /sage  1 of 9 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Cl  Equip,10 Rev                                              Floar              Roonl of Row/Col/mn Na                                                                                                                                                      Cap >                        Eqtfp No                                              Elov.                                                                                          Demand?        OK?              OK?
24T.101-  0  DIESEL COMBUSTION AIR I AB        AUXILIARY 587.00 AB EMER DSL GENRM IN THE MIDDLEEAST        587.00  N/A  Judgment vs. Reatstc Median      Y85                  Yss AB        EMERGENCY DIESEL AIR INTAKE                        REGION OF THE ROOM, 5 FEET EAST OF AB                    Centered Boor Response Spectra SILENCER                                          EMERGENCY DIESEL GENERATOR &#xb9;24ME-150.AB. 12 FEET ABOVE THE 24T-101    0  DIESEL COMBUSTION AIR/ CO        AVXILIARY 587.00 CD EMER DSL GEN RM - IN THE NORTHEAST      587.00  N/A  Judgment VL Reasste Meclan                    Yes      Yes CD        EMERGENCY DIESEL AIR INTAKE                        PART OF THE ROOM, 10 FEET EAST OF CO                    Centered Boor Response Speci/a SILENCER                                          EMERGENCY DIESEL GENERATOR &#xb9;24ME-150CD. 15 FEET ABOVE 24T-112-      DIESEL LUBE OIL I AB EMERGENCY    AUXILIARY 579.00 AB EMER OSL LUBE OIL PIT - IN THE          587.00  N/A  Judgment vs. Roarrste MaSan      Y05  Yss    Yes      Yos    Yes AB        DIESEL FULL FLOW LUBE OIL                          NORTHEAST PART OF THE PIT, 6 FEET                        Centered Boor Response Spectra FILTER                                            NORTHEAST OF AB EMERGENCY DIESEL LUBE OIL SUMP TANK&#xb9;24T 115AB.
24T-112    0  DIESEL LUBE OIL I CO EMERGENCY    AUXILIARY 579.00 COEMERDSLLUBEOILPIT SFEET                  587.00  N/A  Judgment vs. Rearrsbc Medran    Y85                  Yes    Yes CD        DIESEL FULL FLOWLVBE OIL                          NORTHEAST OF CO EMERGENCY DIESEL                        Centered Floar Response Spectra FILTER                                            LUBE OIL SUMP TANK&#xb9;24T-115CD, NEAR THE FLOOR 24T-113-  0  DIESEL LUBE OIL I AB EMERGENCY    AUXILIARY 579.00 ABEMERDSLLUBEOlt.PIT INTHE                  587.00  N/A  Judgment vs. Realistc Mectian    Yes          Y8$      Y8$    Yes AB1        DIESEL FULL FLOW LUBE OIL                          SOUTHEAST PART OF THE PIT, 5 F EET EAST                  Centered Fker Response Speci/0 STRAINER &#xb9;1                                        OF AB EMERGENCY 0! ES EL LUBE OIL SUMP TANK&#xb9;24T 115AB.
24T-1 13-  0  DIESEL LUBE OIL/ABEMERGENCY      AUXILIARY 579.00 AB EMER DSL LUBE OIL PIT - IN THE          587.00  N/A  Judgment vs. Roasste Medi@a      Yes  Yes    Yes      Yos    Yes A82        DIESEL FULL FLOW LUBE OIL                          SOUTHEAST PART OF THE PIT, 5 FEET EAST                  Centered Floor Rosporme Speci/a STRAINER &#xb9;2                                        OF AB EMERGENCY DIESEL LUBE OIL SUMP TANK&#xb9;24T-1 1 stta.
0    24T-113-    0  DIESEL LUBE OIL I CO EMERGENCY    AUXILIARY 579.00 CD EMER DSL LUBE OIL PIT - IN THE          587.00  N/A  Judgment VS. Rea/rote M0C4an    Yes          Yss      Y05    Yss C01        DIESEL FULL FLOW LUBE OIL                          SOUTHEAST PART OF THE PIT, 5 FEET EAST                  Centered Fker Respcese Spectra STRAINER &#xb9;1                                        OF CO EMERGENCY DIESEL CD LUBE OIL SUMP TANK&#xb9;24T 115C D, 24T-113-    0  DIESEL LUBE OIL/CD EMERGENCY      AVXIUARY  579.00 CD EMER OSL LUBE OIL PIT - IN THE          587.00  N/A  Judgment vs. Roaaste Meden      Y05          Yes      Yes    Yes CO2        DiESEL FULL FLOW LUBE OIL                          SOUTHEAST PART OF THE PIT, 5 FEET EAST                  Centered Floor Response Spectra STRAINER &#xb9;2                                        OF CD EMERGENCY DIESEL LUBE OIL SUMP TANK&#xb9;24T 115CD, NEAR THE 24T-116-      DIESEL LUBE OIL I AB EMERGENCY    AUXILIARY 579.00 ABEMERDSLLVBEOILPIT 2FEET                  587.00  N/A  Judgmont vs. Roasste Meden      Yos  Yes    Yes      Yes    Yos AB        DIESEL LUBE OIL HEATER TANK                        NORTHEAST OF AB EMERGENCY DIESEL LUBE                    Centered F ker Response Spectra OIL SUMP TANK&#xb9;24T-1 15tta, NEAR THE FLOOR 10          24T-116-      DIESEL LUBE OIL I CD EMERGENCY    AUXILIARY 579.00 CD EMER DSL LUBE OIL PIT - IN THE          587.00  N/A  Judgment vs. Roasste Meden      Y05  Yes    Yes              Yos CD        01ESEL LUBE 0IL HEATER TANK                        NORTHEAST PART OF 1HE PIT, 3 FEET                        Centered Fker Response Spectra NORTHEAST OF CD EMERGENCY DIESEL LUBE OIL SUMP TANK&#xb9;24T 115CD, 24T-1 18.      DIESEL LUBE OtL I AB EMERGENCY    AUXILIARY 579.00 AB EMER OSL LUBE OIL PIT MI~OUTH            587.00  N/A  Judgmont vs. Reasste Mecaan      Yos  Yes    YOS      Yos    Yes AB        DIESEL BYPASS LUBE OIL FILTER                      REGION OF PlT, 2 FEET SOVTHEAST OF AB                    Centered Fker Response Spectra EMERGENCY DIESEL LUBE 0 IL SUMP TANK&#xb9;2-QT 11548 12          24T-1 18. 0  DIESEL LUBE OIL/ CD EMERGENCY    AUXILIARY 579.00 CD EMER DSL LUBE OIL PIT - 3 F EET          587.00  N/A  Judgment vs. Roasste Mecaan                  Yss      Yes    Y8$
CD        DIESEL BYPASS LUBE OIL FII.TER                    SOUTHEAST OF CD EMERGENCY DIESEL                        Centered Fker Response Spectra LUBE 0 IL SUMP TANK&#xb9;24T-1 1SCD. NEAR THE FLOOR Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and conclusion (whether verified to be seismically adequate or not).                                                            I Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed profe sional engineer.)
                                                                                        /2//3        ~/
Print or Type Name                            Si  ature                        Date                    Print or Type Name                                    ure                  Dae
 
Walkdown;              of 10/04/93                                                            DC C          ..IT 2                                                                                    ~ 'age2of9 SCREENING VERIFICATION DATA SHEET (SVDS) lt<<n  Eq. CI  Equo. ID  Rev      System/Eqtlpment Desc/lpten              Fker              Room or Row/Goh/mn                Base                  Capaaty vs.            Cap a  Caveats Anchor        Ego No.      Mo                                              Elev.                                              Eh/V.                D<<nand Basis          0<<hand?    OK?    OK?          OK?
13      0    24T  143-    0  DIESEL CONTROL AIR/AB            AUXILIARY 587.00 AB EMER OSL GEN RM - 2 FEET SOUTHWEST                      Judgment vs. Reahste Meehan        YBS      YOS    YBS      Yes  Yes AB1          EMERGENCY DIESEL CONTROL AIR                      OF AB EMERGENCY DIESEL GENERATOR                          Centered Roar Response Spectra DRYER &#xb9;1                                          ROOM DOORWAY. 2 FEET SOUTH OF THE NORTH WALL3 FEET ABOVE THE FLOOR 14      0    24T  143. 0  DIESEL CONTROL AIR/AB            AUXILIARY 587.00 AB EMER DSL GENRM 3 FEET SOUTHWEST                  N/A  Judgment vs. Reahste M<<han        YBS      Yes    Yes      Yes  Yes AB2          EMERGENCY DIESEL CONTROL AIR                      OF AB EMERGENCY DIESEL GENERATOR                          Centered Fker Response Spectra DRYER &#xb9;2                                          ROOM DOORWAY, 1 FOOT SOUTH OF THE NORTH WALI 3 FEET ABOVE THE FLOOR 15      0    247-143-    0  DIESEL CONTROL AIR/CD            AUXILIARY 587.00 CDEMERDSLGENRM NTHEMIDDLE                            N/A  Judgment vs. Roahstc M<<han        Yes            YOS      Yes  Yes Col          EMERGENCY DIESEL CONTROL AIR                      SOUTH PART OF THE ROOM, 4 FEET WEST OF                    Centered Fker Response Spectra DRYER &#xb9;1                                          THE CO EMERGENCY DIESEL GENERATOR ROOM DOORWAY. 2 FEET ABOVE 16      0    247-143-    0  DIESELCONTROLAIR/CD                        587.00 CDEMERDSLGENRM INTHEMIDDLE                                Judg/pont vs. Reahste M<<han        Yes    Yes    Yes      YBS  Yes C02          EMERGENCY DIESEL CONTROL NR                        SOUTH PART OF THE ROOM, 4 FEET WEST OF                    Center<<1 Fker Response Spectra DRYER &#xb9;2                                          THE CD EMERGENCY DIESEL GENERATOR ROOM DOORWAY. 2 FEET ABOVE 17      0    24?T 144    0  DIESEL FUEL OIL/AS EMERGENCY      AUXILIARY 587.00 AB EMER DSL GEN RM IN THE SOUTHWEST                  N/A  Judgnlont vs. Roahste M<<han        YBs    Yes    Yes      Yes  YOS AB            DIESEL FUEL OIL TRANSFER                          PART OF THE ROOM, 4 FEET EAST OF AB                      Centered Fker Response Spectra FILTER                                            EMERGENCY DIESEL STARTING Agh RECEIVER &#xb9;2<T 141~2 18      0    247  144    0  DIESEL FUEt,OIL/CD EMERGENCY      AVXIUARY  587.00 CO EMER DSL GEN RM N THE NORTHWEST                        Judgment va Reahste M<<han          Yes      Yos    Yes            Yes CD            DIESEL FUEL OIL TRANSFER                          PART OF THE ROOM, 2 FEET EAST OF THE CD                  Centered Fker Response Spectra FILTER                                            EMERGENCY DIESEL STARTING AIR RECEIVER &#xb9;24?T-141@02.
19      0    2.TT4IGAB    0  STARTING AIR/2AB DIESEL          AUXILIARY 587.00 AS EMER DSL GEN RM                                        Judgment vs. Reahste Meehan        YOS    Yes    YBS      Yes  Yes GENERATOR TUBE TRACK                                                                                        Centered Fker Res      8S      a 20      0    2-TTZGCO      0  STARTING AIR/2CD DIESEL          AUXIUARY  587.00 CD EMER DSL GEN  RM-                                      Judgment vs, Reahste Meehan                Yes    Yes            YBS GENERATOR TUBE TRACK                                                                                        Centered Fker Ros        Spectra 21            24IGAS-      0  DIESEL GENERATION. C/AB          AUXILIARY 587.00 AS EMER DSL GENRM IN THE MIDDLE                            1.5 x Soundng Specoum vs.        YBS    Yes              Yes  YOS FFCKT          EMERGENCY DIESEL GENERATOR                        NORTH REGION OF THE ROOM, 5 FEET WEST                      Roahsdc Median Centered Fker OME-15INIB FIELD FLASH CIRCUIT                    OF RoohfS DOORWAY, INSIDE N SIDE OF AB                            Response Spectra TRANSFORMER                                        EDG CONTROL SUBPANEL1 DGAB, 2'ABOVE FLOOR 24IGCD-      0  DIESEL GENERATION. C / CD        AVXIUARY  587.00 CD EMER DSL GEN RM N THE MIDDLE                            1.5 x Bandng Spect/um vs.        YBS            Yos      Yes  Yes FFCKT          EMERGENCYDIESELGENERATOR                          SOUTH REGION OF THE ROOM, 5 FEET EAST                      Rearrsdc M<<san Centered Fker OME-1 50CD FIELD FLASH CKT                        OF CD EMERGENCY DIESEL GENERATOR                                  Response Spectra TRANSFORMER                                        ROOM 24T  106-    0  DIESEL FUEL OIL/ABEMERGENCY      AUXILIARY 587.00 AB EMER OSL FUEL OiL XFER PMP - N THE                Yes    Banding Spectrum vs. SSE        YBS            Yes            No AB1            DIESEL FUEL OIL TRANSFER PUMP                      MIDDLESOUTHEAST REGION OF THE ROOM,                        Grand Response Spectn/m
                                &#xb9;1                                                25 FEET SOUTH OF THE Roohf S ENTRANCE DOOR, NEAR THE EAST WALL. NEAR THE FLOOR 24      5    24T  106-    0  DIESEL FUEL OIL/AS EMERGENCY      AUXILIARY 587 00 AB EMER DSL FUEL OIL XFER PMP -N THE                Yes    Bounchng Spectrum vs. SSE        Yes      Yes AB2            DIESEL FUEL Olt. TRANSFER PUMP                    MIDDLESOUTHEAST REGION OF THE ROOM.                        Ground Response Speci/um
                                &#xb9;2                                                27 FEET SOUTH OF THE RoolfS ENTRANCE DOOR. NEAR THE EAST WALINEARTHE FLOOR 25      5    2437 106-    0  DIESEL FVELOIL/CDEMERGENCY        AUXILIARY        CD EMER DSL FUEL OIL XF ER PMP - IN THE              YOS    Bourxhng Spectrum vs. SSE        YBS      Yes    Yes            Yes Col          DIESEL FUEL OIL TRANSFER PUMP                      NORTHEAST REGION OF THE ROOM, 4 FEET                        Ground Response Spectrum
                                &#xb9;1                                                WEST OF THE EAST WAL11 FOOT ABOVE THE FLOOR Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" indudes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed prof ssional engineer.)
Print or Type Name                                i  nature                      Date                      Print or T pe Name                                  na    re
 
C Walkdown:            Jf 10/04/93                                                            DC CO          .IT 2                                                                                .'age 3 of 9 SCREENING VERIFICATION DATA SHEET (SVDS)
Equp.lo  Rsv                                              Fkror            Room or Rowlooasnn              Base              Capacrty vs.          Cap >  Caveals            Interact Eqvip No.      No                                              Etsv.                                              Elev.            Demand Basis          Demand?  OK?        OK?      OK?    OK7 24T-108-    0  DIESEL FUEL OIL I CD EMERGENCY  AUXILIARY 587.00 CD EMER DSL FUEL OIL XFER PMP- IN THE                    Boundng Spectrum vs. SSE                                          Yes.
CD2          DIESEL FUEL OtL TRANSFER PUMP                    NORTHEAST REGION OF THE ROOM, 4 FEET                    Grand Response Spectrum
                              <<2                                                EAST OF THE MIDDLEOF THE EAST WALI1 FOOT ABOVE THE FLOOR 27          24T.111-    0  OiESEL LUBE OlL I AB EMERGENCY  AUXILIARY 579.00 AB EMER DSL LUBE OIL PIT - IN THE MIDDLE    587.00      Bounang Spectrum vs. SSE      Yes                        Yes    Yes AB          DIESEL LUBE OIL BEFORE ANO                        EAST PART OF THE PIT, 3 FEET EAST OF AB                  Ground Response Spectrum AFTER PUMP                                        EMERGENCY DIESEL AS LUBE OIL SUMP TANK 4T 1154B.
28          24T  111 ~      DIESEL LUBE OIL I CD EMERGENCY  AUXILIARY 579.00 CD EMER DSL LUBE OIL PIT 2 FEET EAST OF    587.00  Yes  Bounang Spectrum vs. SSE      Yes    Yss        Yss      Yes    Yes CD          DIESEL LUBE OIL BEFORE AND                        CO EMERGENCY DIESEL LUBE OIL SUMP TANK                  Ground Response Spsctnsn AFTER PUMP                                        &#xb9;24T-115CO, NEAR THE FLOOR 24T-117-    0  DIESEL LUBE OIL I AB EMERGENCY  AUXILIARY 579.00 AB EMER DSL LUBE OIL PIT -N THE                    Yes  Bounang Spectrum vs. SSE AB'                                                                                                                                                    Yes    Yes        Yes      Yes    Yes DIESEL LUBE OIL HEATER QT-118-                    NORTHWEST CORNER OF THE PIT, 2 FEET                      Ground Response Spectrum AB PUMP                                          NORTH OF AB EMERGENCY DIESEL LUBE OIL SUMP TANK&#xb9;24T-115-AB. NEAR THE 24T  117-  0  DIESEL LUBE OIL I CD EMERGENCY  AUXILIARY 579.00 CD EMER DSL LUBE OIL PiT IN THE                    Yos  Bounang Spectrum vs. SSE CD Yss                        Yes    Yes DIESEL LUBE OIL HEATER QT-118.                    NORTHWEST CORNER OF THE PIT, 2 FEET                      Ground Response Spectrum CD PUMP                                          NORTH OF CD EMERGENCY DIESEL LUBE OIL SUMP TANK<<24T 11540 31          24T-119-    0  DIESEL LUBE OtL I AS EMERGENCY  AUXILIARY 579.00 AB EMER DSL LUBE OIL PIT - N THE                        Bounding Spectrum vs. SSE AB Yss    Yes DIESEL BYPASS LUBE OIL FILTER                    SOUTHWEST CORNER OF THE PIT, NEAR THE                    Ground Respcnse Spectrum OT-118JIB PUMP                                    FLOOR 32          24T-119. 0  DIESEL LUBE OIL I CD EMERGENCY  AUXtLIARY 579.00 CD EMER DSL LUBE OIL PIT - IN THE          587.00  Yos  Bounang Spectrum vs. SSE      Yes    Yos        Yes      Yes    Yes CD          DIESEL BYPASS LUBE OIL FILTER                    SOUTHWEST PART OF THE PIT, 3 FEET SOUTH                  Ground Response Spectrum QT-1 1 BCO PUMP                                  OF CD EMERGENCY DIESEL LUBE OIL SUMP TANK<<24T-11 &CO. NEAR THE 24T-130. 0  DtESEL JACKET WATER I AB        AUXILIARY 587.00 AB EMER OSL GEN RM - IN THE SOUTHEAST              Yes  Bounang Spectrum vs. SSE      Yes              Yes      Yos    Yss AB1          EMERGENCY DIESEL JACKET                          REGION OF THE ROOM, 20 FEET EAST OF AB                  Grand Response Specuum WATER PUMP &#xb9;1                                      EMERGENCY DIESEL GENERATOR <<24ME-15OAB 24T-130-    0  DtESEL JACKETWATERIAB            AUXILIARY 587.00 AS EMER DSL GEN RM N THE MIDDLE EAST                Yos  Bounang Spectrum vS. SSE      Yos                        Yos    Yss AB2          EMERGENCY DIESEL JACKET                          REGION OF THE ROOM, 20 FEET EAST OF AB                  Ground Response Spectnxn WATER PUMP &#xb9;2                                      EMERGENCY DIESEL GENERATOR <<24 ME-150JIB. NEAR THE EAST 24T-130-    0  DlESEL JACKET WATER I CD        AUXIUARY  587.00 CD EMER DSL GEN RM IN THE SOUTHEAST                Yes  Bounc4ng Spectrum vs. SSE      Yes                        Yes    Yss CO1          EMERGENCY DIESEL JACKET                          REGION OF THE ROOM,20 FEET EAST OF CD                    Ground Response Speaun WATER PUMP 1                                      EMERGENCY DIESEL GENERATOR &#xb9;24ME 150CD 24T  130. 0  DIESEL JACKETWATERICD          AUXILIARY  587.00 CD EMER DSL GEN RM -IN THE SOUTHEAST                    Bounang Spectrum vs. SSE CD2          EMERGENCY DIESEL JACKET Yos REGION OF THE ROOM. 20 FEET EAST OF CO                  Ground Response Spectrum WATER PUMP 2                                      EMERGENCY DIESEL GENERATOR <<24ME 150CD 37          24T-135-    0  DtESEL JACKET WATER IAB        AUXILIARY  587.00 AB EMER DSL GEN RM - IN THE NORTHEAST                    Bounang Spectrum vs. SSE      Yes                        Yss    Yos AB          EMERGENCY DIESEL AIDQUARY                        REGIQN oF THE RoolvL 2 FEET soUTHwEsT                    Ground Response Spectrum JACKET WATER PUMP                                  OF AB EMERGENCY DIESEL AUXILIARY JACKET WATER HEATER 24T-135. 0  DIESEL JACKET WATER/CD          AUXILIARY 587.00 Co EMER DSL GEN RM - IN THE EAST PART OF    587.00      Bounang Spectrual vs. SSE                                  Yes CD          EMERGENCY DIESEL AUXtUARY                        THE ROOM, NEAR THE EAST WALI 5 FEET                      Ground Response Spectrum JACKET WATER PUMP                                  SOUTH OF CD EMERGENCY DIESEL JACKET WATER PUMP &#xb9;24T-1304 D2 Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed pro essional engineer.)
Print or T pe Name 0/    ignature                      Date                      Print or Type Name                          Si  ature                        Date
 
Walkdown:            . of 10/04/93                                                            DC CO        .4IT 2                                                                              Page4ofg SCREENING VERIFICATION DATA SHEET (SVDS) 8sm    Eq. Cl  Equi?.ID  Rev      System/Equipment Descipbon              Floor            Room or Row/Column              Base              Capacity vs.          Cap 8  Caveats        Interact Equp No.      No                                              Elev.                                            Elev.            Demand Basis          Demand?    OK?    OK?      OK?    OK?
39      7    24V.120. 0  DIESEL STARTING AIR/2-XTC401                587.00 ABEMERDSLGENRM 3FEETWESTOFAB                      Yos  Bounding Spectnsn vs. SSE              Yos                    Yes AB          6 2.XTC402 CONTROL AIR SAFETY                      EMERGENCY DIESEL GENERATOR ROOM                        Ground Response Spectnsn VALVE                                              DOORWAY. 4 FEET SOUTH OF THE NORTH WALL 24V-120-    0  DIESEL STARTING AIR/2-XTC406      AUXILIARY 581.00 CD EMER DSL GEN RM-4 FEET WEST OF THE      581,00  Yes  Boundrtg Speotnsn va. SSE                              Yes    Yes.
CO          AND 2.XTC407 CONTROL AIR                          CD EMERGENCY DIESEL GENERATOR ROOM                      Ground Response Spectrum SAFETY VALVE                                      DOORWAY. ON THE SOUTH WALL 41            24V-1 39-    0  DIESELSTARTINGAIR/AB              AUXILIARY 587.00 AB EMER DSL GEN RM 10 FEET SOUTHEAST      587.00  Yos  Boundsvg Spectrum vs. SSE      Yes      Y8$            Yes    Yes AB          EMERGENCY DIESEL STARTING                          OF THE AB EMERGENCY DIESEL GENERATOR                    Ground Response Spectrum tuR TO TURBOCHARGER SAFETY                        ROOM DOORWAY, 10 FEET ABOVE THE FLOOR VALVE 42      7    24V-139-    0  DIESELSTARTINGAIR/CD              AUXILIARY 587.00 CD EMER DSL GEN RM -AT THE NORTHEAST      587.00  Y8$  Bowleg Spectrum vs. SSE                Yes            Yes    Yes CO          EMERGENCY DIESEL STARTING                          END OF THE CD EMERGENCY DIESEL, 11 FEET                Ground Response Spectrum AIR TO TURBOCHARGER SAFHY                          ABOVE THE FLOOR VALVE 2.SV-16AB    0  ESSENTIAL SERVICE WATER/AB        AUXILIARY 58100  AB EMER DSL GEN RM-5FEEl'AST OF THE                    Boundstg Spectrum vs. SSE      Yos      Yes            Yes    Yos EMERGENCY DIESEL JACKET                            AB EMERGENCY OtESEL GENERATOR                          Ground Response Spoctsum WATER COOLER QT 131-AB                            DOORWAY, NEAR THE NORTH WALI8FEET ESSENTIAL SERVICE WATER                            ABOVE THE FLOOR OUTLET SAFETY VALVE 44            2-Sv    0  ESSENTIAL SERVICE WATER/CD        AVXILIARY 587.00 CD EMER DSL GEN RM - ON THE WEST END              Y85  Boundstg Spectrum vs. SSE      Yes      Yes            Yes    Yes CD          EMERGENCY DIESEL JACKET                            OF THE CD EMERGENCY JACKET DIESEL                      Ground Response S pecuum WATER COOLER QT 13140                              WATER COOLER. IN THE SOUTHEAST ESSENTIAL SERVICE WATER                            CORNER OF THE ROOM, 10 FEET ABOVE THE OUTLET SAFETY VALVE                                FLOOR 2-SV-200-    0  DIESEL FUEL OIL/AB EMERGENCY      AUXILIARY 587.00 AB EMER DSL GEN RM - SOUTHWEST PART OF 587.00      Yes  Boundsvg Spectrum vs. SSE      Yes      Yes            Yes    Yes AB          DIESEL FUEL OIL MANIFOLDSTO                        THE ROOM. INSIDE FUEL OIL DAY TANK                      Ground Response Speci/um FUEL OIL OAY TANKSAFETY VALVE                      ENCLOSURE 24 V-200-    0  DIESEL FUELOIL/CD EMERGENCY                581 00 CD EMER DSL GENRM-15 FEET NORTHWEST 587 00              Boundstg Spectnsn vs. SSE                                      Yes CD          DIESEL FUEL OIL MANIFOLOS TO                      OF DIESEL GENERATOR, INSIDE FUEL OIL DAY                Ground Response Spectrum FUEL OIL DAYTANKSAFETY VALVE                      TANK ENCLOSURE 47      7    2-SV.201-    0  DIESEL FUEL OIL/AB EMERGENCY      AUXILIARY 587.00 AB EMER DSL GEN RM SOUTHEAST OF THE                    Boundstg Spectrum vs. SSE              Y8$            Yes    Yes AB1          DIESEL FRONT BANKFUEL OIL                          AS EMERGENCY DIESEL                                    Ground Resporee Spectrum MANIFOLDSAFElY VALVE 24V-201-      0  DIESEL FUEL OIL/ABEMERGENCY      AUXILIARY 587.00 AB EMER DSL GEN RM - NORTHEAST OF AB                    Boundstg Spectrum vs: SSE      Yes            N/A              Yes AB2          DIESEL REAR BANKFUEL OIL                          EMERGENCYDIESEL                                        Ground Respcnse Specuurn MANIFOLDSAFETY VALVE 49      7    24 V-201-    0  DIESEL FUEL OIL/CD EMERGENCY                581.00 CD EMER DSL GEN RM - ON THE NORTHWEST      587.00      Bouncang Spectrum vs. SSE                              Yes    Yos CO1          DIESEL FRONT BANKFUEL OIL                          END OF CD EMERGENCY DIESEL                              Ground Response Spectrum MANIFOLDSAFElY VALVE 24V.201-    0  DIESEL FUELOIL/CD EMERGENCY      AUXILIARY 587.00 CD EMER DSL GEN RM - IN THE SOUTHWEST              Y8$  Boundeg Spectrum vs. SSE      Yes      Y8$            Yes    Yes CD2          DIESEL REAR BANKFUEL OIL                          CORNER OF CO EMERGENCY DIESEL                          Ground Response Spectrum MANIFOLDSAFETY VALVE                              GENERATOR ROOM. 10 FEET ABOVE FLOOR 51          24V4MB        0  DIESEL JACKET WATER/AB            AVXIUARY  587.00 AB EMER DSL GEN RM - NEAR CENTER OF                Y8$  Bouabrg Spectrum vs. SSE                      N/A      Yes    Yes EMERGENCY DIESEL AVXIUARY                          WEST WALI7FEET ABOVE THE FLOOR                        Ground Response Speci/um JACKET WATER HEATER QT-134~
SAFETY VALVE 24V41      0  DIESEL JACKET WATER / GD                    587.00 CD EMER DSL GEN RM - NEAR THE CENTER              Yos  Boundstg Speci/um vs. SSE                                      Yos CD          EMERGENCY DIESEL AUXILIARY                        OF THE EAST WALI 7 FEET ABOVE THE                      Ground Response Spectrum JACKET WATER HEATER QT-134-                        FLOOR CO SAFElY VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed profes onal engineer.)
Vi Print or T pe Name                                Sign ture                      Date                    Print or Type Name                          Si na    re                    ate
 
Walkdown:              of 10/04/93                                                              DC COv        slT 2                                                                              Page 5 of SCREENING VERIFICATION DATA SHEET (SVDS)                                                                                      9'q.
Cl  Equip. ID No.
2<v                  AB1 Rev No 0
System/Equpment Descnption DIESEL STARTNG AIR I AB EMERGENCY DIESEL STARTNG tuR RECEIVER QT-14MBt SAFHY VALVE AUXILIARY Floor Elev.
587.00 Room or Rowlcotumn AB EMER DSL GEN RM IN SOU1'HWEST PART OF ROOM Base Elev.
587.00  Yes  ~      Capacity vs.
Demand Baste Speansn vL SSE Grourxl Response Spealum Cap >
Demand?
Caveats OK?
Yes Iecttof OK?
Interaa OK7 Equy OK?
2~.78-        0  DIESEL STARTING AIR I AB            AUXIUARY  587.00 AB EMER DSLGENRM IN SOUTHWEST PART        587.00  Yes  Bourx4ng Spechun vs. SSE      Yes    Yes              Yes    Yes AB2            EMERGENCY DIESEL STARTING                            OF ROOM                                                Ground Response Spearum A!R RECEIVER QT-1 41 J$ 2 SAFETY VALVE 0  DIESEL STARTNG AIR I CD            AUXIUARY  587.00 CD EMER DSL GENRM    N THE NORTHWEST      587.00  Yes  Boundeg Spectnrn vs. SSE      Yss    Yes    NIA      Yes    Yes EMERGENCY DIESEL STARTNG                            REGION OF THE ROOM                                    Groted Response Spectrum AIR RECEIVER QT-141 C01 SAFHY VALVE 2~        0  DIESEL STARTING AIR I CD            AUXILIARY 587.00 CO EMER DSLGENRM IN THE NORTHWEST        587.00  Yes  Boundeg Spearum vs. SSE        Y8$    Yes              Yss    Yss CD2            EMERGENCY DIESEL STARTNG                            AREA OF THE ROOM                                      Ground Response Spearum A!R RECEIVER QT 141<02 SAFETY VALVE 57                          0  DIESELSTARTINGAtRIAB                AUXILIARY 587.00 AB EMER DSL GEN RM-2 FEET WEST OF THE    587.00  Yes  Bounchrg Spearum vs. SSE      Yes    Yes    NlA            Yes EMERGENCY DIESEL CONTROL AIR                        AB EMERGENCY DIESEL GENERATOR ROOM                    Ground Response Spectrum DRYER QT-143ABt SAFHYVALVE                          DOORWAY, 3 FEET SOUTH OF THE NORTH WALL 2-SV      0  DIESEL STARTING AIR I AB            AUXILIARY 587.00 ABEMERDSLGENRM 3FEETWESTOFTHE            587.00  Yes  Boundeg Specuurn vs. SSE      Yss    Yes              Yes    Y8$
A82            EMERGENCY DIESEL CONTROL AIR                        AB EMERGENCY DIESEL GENERATOR ROOM                    Ground Response Specuurn DRYER QT-143AB2 SAFHY VALVE                          DOORWAY, 3 FEET SOUTH OF THE NORTH WALL 59                          0  DIESELSTARTNGAIRICD                AUXILIARY 587.00 CO EMER DSL GEM RM-3 FEET WEST OF THE    587 00  Yes  Boundeg Spscaurn vs. SSE      Yes    Yes              Yes    Yes EMERGENCY DIESEL CONTROL AIR                        CO EMERGENCY DIESEL GENERATOR ROOM                    Ground Response Spectrun DRYER QT-143401 SAFHY VALVE                          DOORWAY, 3 FEET SOUTH OF THE NORTH WALL 7    2-SV      0  DIESEL STARTING AIR I CD            AUXILIARY 587.00 CD EMER DSL GEM RM-3 FEET WEST OF THE    587.00  Yes  Bounoeg Spectrum vs. SSE                      NIA      Y8$    Yes C02            EMERGENCY DIESEL CONTROL AIR                        CO EMERGENCY DIESEL GENERATOR ROOM                    Ground Response Spsctnsn DRYER QT-143C02 SAFHY VALVE                          DOORWAY, 3 FEET SOUTH OF THE NORTH WALL 61            2.WRY-      0  ESSENTIAL SERVICE WATER I CO        AVXIUARY  587.00 CDEMERDSLGENRM NTHENORTHEAST              587.00  Yes  Baedeg Spearum vs. SSE                                  Y8$    Yes
                ?22@0            EMERGENCY DIESEL NORTH                              PART OF THE ROOM. 2 FEET NORTH OF                      Ground Response Spectrum COMBUSTION AIR AFTERCOOLER                          CO EMERGENCY DIESEL JACKET WATER HE<7DN ESW INLET/BYPASS                              SURGE TANK&#xb9;2<T-1 33CD.
VALVE 2-WRV-      0  ESSENTIAL SERVICE WATER I CD        AUXILIARY 587.00 CD EMER DSL GEN RM - IN THE SOUTHEAST    587.00  Yes  Bourxteg Spectrum vs. SSE              Yes              Yss    Y8$
724CO            EMERGENCY DIESEL SOUTH                              PART OF THE ROOM, ON THE SOUTHEAST                    Ground Response Spectnet
                                                                                                                                            ~
COMBUSTION AIR AFTERCOOLER                          CORNER OF CD EMERGENCY DIESEL HE<7<OS ESW INLET/BYPASS                            GENERATOR &#xb9;24?ME-1 SOCD, NEAR THE VALVE 2.WRV        0  ESSENTIAL SERVICE WATER IAB        AUXILIARY 587.00 ABEMERDSLGENRM 10FEETSOUTHOF              587.00  Yes          Spectrum vs. SSE      Yes    Yes              Yes    Yes 72648            EMERGENCY DIESEL NORTH                              THE AB EMERGENCY DIESEL GENREATOR                      Ground Response Specbum COMBUSTION AIR AFTERCOOLER                          ROOM    DOORWAY, ON THE DIESEL END OF HE<?~N ESW INLETIBYPASS                              AB EMERGENCY DIESEL GENERATOR VALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                                  Si na  re                      Date                    Print or T pe Name                          Si    tur tZ Zf    fC Date
 
Walkdown:              uf 10/04/93                                                              DC CO          ..IT 2                                                                              r'age 6 of 9 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. CI    Equip.lD  Rev      SystemrEquiprnent Descr$ 46cn    Busdng. Fker              Room or Rowlcaumn              Base No.      No Capaaty vs.          Cap 8  Caveats  Afcnor  Interact EquSL Elev.                                            Elev.            Demand Basis          Demand?  OK?      OK?      OK?    OK?
2-WRV-      0  ESSENTIAL SERVICE WATER IAB          AUXILIARY        AB EMER OSL GEN RM - IN THE SOUTHEAST      587.00  Yes  Boundng Specuum vs. SSE      Yes                      Yes 728-AB          EMERGENCY DIESEL SOUTH                                REGION OF THE ROOM, ON THE DIESEL END                  Ground Response Spectrum          t COMBUSTION AIR AFTERCOOLER                            OF AB EMERGENCY DIESEL GENERATOR &#xb9;2-HE<TABS ESW NLETIBYPASS                              OME 150AB. 4 FEET ABOVE THE FLOOR VAlVE 2.XRV-220    0  DIESEL STARTING AIR I AB            AUXIUARY  587.00 AB EMER OSL GEN RM - 10 FEET SOUTHEAST    587.00  Yes  Boundng Spearum vs. SSE      Yes      Yes              Yes    Yes EMERGENCY DIESEL STARTING                            OF THE AB EMERGENCY DIESEL GENERATOR                    Ground R8sponso Spoaium AIR JET ASSIST CONTROL VALVE                          ROOM DOORWAY, ON THE DIESEL END OF AB EMERGENCY DIESEL GENERATOR 7    2.XRV-221    0  DIESEL STARTING AIR I AB            AUXILIARY        AB FMER DSL GENRM IN THE EAST REGION      587.00  Yes  Bandng Spectrum vs. SSE 4
Yes      Yes              Yos    Yes EMERGENCY DIESEL FRONT BANK                          OF THE ROOM. 1 FOOT ABOVE THE DIESEL                    Ground Response Spoctmm STARTING AIR SHUTOFF VALVE                            END OF AB EMERGENCY DIESEL GENERATOR
                                                                                      &#xb9;2DME-1 SOAB 67            2-XRV-222    0  DIESEL STARTING AIR I AB            AUXILIARY        ABEMERDSLGENRM NTHENORTHEAST              587.00  Yes  Boundng Spectrum vs. SSE      Yes      Y8$              Y8$    Y8$
EMERGENCY DIESEL REAR BANK                            REGION OF THE ROOM, ON THE DIESEL END                  Grand Response Spectrum STARTING AIR SHUTOFF VALVE                            OF AB EMERGENCY DIESEL GENERATOR &#xb9;2-OME-150AB, 10 FEET ABOVE THE 2.XRV-225    0  DIESEL STARTNG AIR I CO              AUXILIARY        CD EMER DSL GEN RM - N THE NORTHEAST      587.00  Yos  Bandng Spectrum vs. SSE                                        Yes EMERGENCY DIESEL STARTING                            PART OF THE ROOM, ON THE NORTHEAST                      Grand Response Spectrum AIR JET ASSIST CONTROL VALVE                          END OF CD EMERGENCY DIESEL GENERATOR &#xb9;243ME-1 50CD. 10 FEET ABOVE 69            2-XRV-226    0  DIESEL STARTNG AIR I CO              AUXILIARY        CD EMER OSL GEM RM ON THE NORTHEAST        587.00  Yes  Boundng Spearum vs. SSE      Yos      Yes              Yes    Y8$
EMERGENCY DIESEL FRONT BANK                          CORNER OF CD EMERGENCY DIESEL                          Grand Response Spectrum STARTING AIR SHUTOFF VALVE                            GENERATOR &#xb9;2OME-150CD, 10 FEET ABOVE THE FLOOR 70            2-XRV-227    0  DIESEL STARTING AIR I CD            AUXILIARY        CD EMER DSL GEN RM IM THE NORTHEAST        587.00  Yes  Bandng Spearum vs. SSE        Yes                      Yes    Yos EMERGENCY DIESEL REAR BANK                            PART OF THE ROOM, 3 FEET NORTHEAST OF                  Ground Response Spectnsn STARTING AIR SHI/TOFF VALVE                          CD EMERGENCY DIESEL GENERATOR &#xb9;2-OME-1 50CD. 10 FEET ABOVE 71            24tV4DP-      0  DIESEL ROOM VENTILATIONI CD          AUXILIARY        CD EMER DSL GEN RM - 23 FEET WEST OF      587.00  Yes  Boundng Spectrum vs. SSE      Yes              NIA      Yos CD1            EMERGENCY DIESEL GENERATOR                            THE MAN ENTRANCE DOOR. NEAR THE                        Ground Response Spectrum ROOM VENTILATIONEXHAUST FAN                          SOUTH WAU10 FEET ABOVE THE FLOOR HV4?GX-I TEMPERING AIR DAMPER 72            24IV40P-      0  DIESEL ROOM VENTILATIONI CD          AUXILIARY        CD EMER DSL GEN RM IN THE SOUTHEAST        587.00  Yes  Boundng Specuum vs. SSE                Yes              Yos    Yes C02            EMERGENCY DIESEL GENERATOR                            PART OF THE ROOM, NEAR THE WAll 10                      Ground Response S pectnsn ROOM VENTILATIONSUPPLY FAM                            FEET ABOVE THE FLOOR HV4IGS-1 TEMPERNG AIR DAMPER 73            2460.240      0  DIESEL LUBE OIL I AB EMERGENCY                        ABEMERDSLGENRM ONTHEDIESELEND              587.00  Yes  Bandng Spearum vs. SSE        Yes      Y8$    NIA      Yos    Yos DIESEL UPPER VALVEGEAR                                OF AB EMERGENCY DIESEL GENERATOR &#xb9;2.                    Grand Response Spectrum LUBRICATIONCONTROL SOLENOID                          OME.1 50AB. 8 FEET ABOVE THE FLOOR ir1 74            2480-241      0  DIESEL LUBE OIL I AB EMERGENCY      AUXILIARY        AB EMERDSLGENRM-ON THE DIESEL END          587.00  Yes  Bandng Spectrum vs. SSE                                Yos    Yes DIESEL UPPER VALVEGEAR                                OF AB EMERGENCY DIESEL GENERATOR &#xb9;2-                    Ground Response Spoarum LUBRICATIONCONTROL SOLENOID                          OME-15OAB, 7 FEET ABOVE THE FLOOR
                                &#xb9;2 75            2+60-245      0  DIESEL LUBE OIL I CD EMER            AUXILIARY        CD EMER DSL GEN RM - IN THE MiDDLE EAST    587.00  Yes  Bandng Spearum vs. SSE        Y8$                      Yes    Yes DIESEL GEN UPPER VALVEGEAR                            PART OF THE ROOM, ON THE EAST END OF                    Ground Response Spectrum LUBRICATIONCONTROL SOLENOID                          CD EMERGENCY DIESEL GENERATOR &#xb9;2-
                                &#xb9;1                                                    OME 150CD, 7 FEET ABOVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate.        All information indudes each entry and condusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed profes ional engineer.)
1~    ~> tE Print or Type Name                                  Si    ture                      Dae                    Print or Type Name                          Si nature                      Date
 
Walkdown:            of 10/04/93                                                              DC C          slT2 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. CI  Equip.tD  Rsv      system/Equipmera Description              Fkxr.              Room or Row/Column                                          Cspacrty vs.            Cap>>    Caveals Anchor          Equip No.      No                                                Elev.                                                                        Demand Basis            Demarxi7  OIQ    OKT            OXT ZMO-246      0  DIESEL LUBE OIL I CD EMER        AUXILIARY  587.00  CQ EMER DSL GEN RM - IN THE MiDDLE EAST                Yes    Bounding Spectrum vs. SSE        Yes      Yes            Yos    Yes DIESEL GEM UPPER VALVEGEAR                          PART OF THE ROOM, 0 M THE EAST END OF                          Ground Response Spectrum LUBRICATIONCONTROL SOLENOID                          CD EMERGENCY DIESEL GENERATOR &#xb9;2-OME-1 50CO. 6 FEET ABOVE 77          240/4/Gs-    0  DIESEL ROOM VEMTNATIOMICD        AUXILIARY  587.00  CD EMER DSL GEN RM - N THE SOUTHEAST                          1S x Boundstg Spearum vs.                        Yes      Y4$
1            EMERGENCY DIESEL GENERATOR                          PART OF THE ROOM. 20 FEET EAST OF THE                        Rearrsdc Me%an Centeed Fkxx ROOM VENTIIATIONSUPPLY FAN                          GENERATOR END OF CO EMERGENCY                                        Response Spsara GENERATOR 02&ME-15&CD. 10 78          24IV<GS-      0  DIESEL ROOM VENTitATION/AB        AUXILIARY  587.00  AS EMER DSL GEM RM - IN THE SOUTHEAST                          1.5 x Boundrrg spearum vs.        Yes      Yes    Yes      Yes 2            EMERGENCY DIESEL GENERATOR                          REGION OF THE ROOM. OM THE EAST WAU                          Rsarrsbc Median Centered Fkcr ROOM VENTIIATIONSUPPLY FAN                          15 FEET ABOVE THE FLOOR                                              Response S 79          24IV47GS-        DIESEL ROOM VENTILATIONI AS      AVXII.IARY 587.00  AB EMER DSL GEM RM-4 FEET EAST OF THE                          M    x Bounrfstg Spectrum vs.                    Yos            Yes 3            EMERGENCY DIESEL GENERATOR                          EAST END OF AB EMERGENCY DIESEL                              Rsahstic Messn Centered Fkcr ROOM CABNET VENTIIATION                              GENERATOR &#xb9;2<ME-1 SQUAB, IN A                                        Response Spectra SUPPLY FAM                                          VENTltATIONDUCT, 10 FEET ABOVE THE 24IV47GS-    0  DIESEL ROOM VENTILATIONI CD      AUXILIARY  587.00  CO EMER DSL GEN RM -12 FEET    NORTHEAS1'F              N/A    1.5 x Boundrng Spearurn va                      Yes      Yos    Yos 4            EMERGENCY DIESEL GENERATOR                              CD EMERGENCY DIESEL GENERATOR                              Reassdc Mesan Centered Fkcr ROOM CAB NET VENTIIATION                            CONTROL SVBPANEL &#xb9;247GCO, LOCATED IN                                Response Spectra SUPPLY FAN                                          A VEMTllATIOMDUCT. 12 F EET 81          24IV47GX      0  DIESEL ROOM VENTIIATIQMI CD      AUXII.IARY 587.00  CO EMER DSL GEN RM IM THE SOUTHWEST                            1.5 x Boundrrg Spectrum vs.      Yes            Yos      Yos 1          EMERGENCY DIESEL GENERATOR                          CORNER OF THE ROOM, 15 FEET ABOVE THE                        Reasstic Median Centered Floor ROOM VENTILATIONEXHAUST CAN                          FLOOR                                                                Response Spectra 24IV4GX-    0  DIESEL ROOM VENTILATIONI AB      AUXILIARY  587.00  AB EMER DSL GEN RM - IN THE NORTHWEST                          1.5 x Boundrtg Spsctnm vS.                Yes    Yes      Y4$
2            EMERGENCY DIESEL GENERATOR                          REGION OF THE ROOM. OM THE NORTH WAU                        R045$ 5c Mefan Centered Fker ROOM VENTIIATIOMEXHAUST FAN                          15FEETABOVE THE FLOOR                                                Response Spears 10    24IV4ID-    0  DIESEL ROOM VENTILATIONI AB      AUXILIARY  587.00  AB EMER DSL GEN RM - N THE NORTHWEST                    Yes    Boundrtg Spectrum vs. SSE        Yes    Yes    Yes      Y4$
PA            EMERGENCY DIESEL GENERATOR                          REGION OF THE ROOM. 24 FEET WEST OF THE                        Ground Response Spectrum ROOM VENTIIATIONEXHAUST FAN                          ROOWS ENTRANCE DOORWAY, ON THE HV4IGX-2 TEMPERING AIR                              NORTH WALI15FEET ABOVE DAMPER 10    24IV470P-    0  DIESEL ROOM VENTRATIONIAB        AUXILIARY  587.00  AB EMER OSL GEN RM - N THE SQVTHEAST                            Boundrtg 8 pecuum vs. SSE.                      Yos AB2          EMERGENCY DIESEL GENERATOR                          REGION OF THE ROOM. 3 FEET NORTHEAST                            Ground Response Spect/um ROOM VENTIIATIONSUPPLY FAN                          OF THE AB EMERGENCY DiESEL FUEL OIL HV4IGS.Z TEMPERING AIR                              TRANSFER PUMP ROOM DOORWAY, 15 DAMPER 12    2427402-    0  DIESEL COMBUSTION AIR I AB        AUXILIARY  587.00  AB EMER OSL GEN RM - 10 FEET SOUTH OF AB                        Boundng spectrum vs. ssE          Yos            Yos      Yes AB          EMERGENCY DIESEL                                    EMERGENCY DIESEL GENERATOR ROOM                                Ground Response Spsct/um TURBOCHARGER                                        DOORWAY, 4 FEET EAST OF AB EMERGENCY DIESEL GENERATOR 12    24740Z-      0  DIESEL COMBUSTION AIR/CD        AUXILIARY  587.00 CD EMER DSL GEN RM - OH THE NORTHEAST                    Yes    Boundstg Spearum vs. SSE                  Yes    Yes    Y4$    Yss CO            EMERGENCY DIESEL                                    CORNER OF THE CD EMERGENCY DIESEL                              Grourxl Response Spectrum TURBOCHARGER                                        GENERATOR &#xb9;247ME-I SOCD, 8 FEET ABOVE THE FLOOR 87    14                  0  120/208V MLSC SAFETY RELATED    AUXILIARY  58T.00  CD EMER DSL GENRM-10 FEET NWOF CD                      Yes    Boundng Speansn vs. SSE                  Yes    Yss    Y4$
POWER DISTRIBUTIONI POWER                            EMERGENCY D!ESEL GENERATOR &#xb9;2&ME-                              Ground Response Spearum PANEL                                                1504D, ON THE NORTH WALL3'BOVE FLOOR 14                  0  120/208V Misc SAFETy REIATED    AUXILIARY  587.00  CD EMER DSL GEM RM-IM NE REGION OF                      Yes    Branding Speansn vs. SSE        Yss    Yes    Yos POWER DISTRIBUTIONI 120I208                          ROOM, 5 FT NORTH OF NE END OF EMERG                            Grand Response Spectrum VAC AVXIUARYF EEDWATER                              DIESEL GEN CD, OM DISTRIBUTION PANEL Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with ail the entries and conclusions. One signatory should. be a licensed p ofessional engineer.)
                                                                                            /zion                                                                                                          /s. s//fs Print or Type Name                                ignature                        Dae                          Print or T pe Name                                S  n  ure                    Date
 
Walkdown:              uf 10/04/93                                                            DC CO        .iT 2                                                                              . age8ofg SCREENING VERIFICATION DATA SHEET (SVDS)
Rem    Eq. Cl  Equy.ln    Rev                                              Floor                                            Base                Capacay vs.            Cap >                        Eqrap No.      Mo                                              Elev.                                            Elev.            Demand BSSLS            Dam and7        OK7            OK7 89      14      2-ELSC    0  121208V MISC SAFETY RELATED        AUXIUARY        ABEMERDSLGENRM INTHENEREGIONOF            587.00  Yes            Spectrum vs. SSE                    Yes Yes    Yes            Yes    Yes POWER DISTR I POWER PANEL                          THE ROOM. ON THE EAST WALL                              Ground Re        Spectrum 90    14      2<LSCX      0  120I208V MISC SAF ETY RELATED      AUXILIARY      AB EMER DSL GEN RM - IN SE REGION OF      587.00  Yes                                                Yes souring Spectrum vs. SSE        Yes    Y8$            Yes    YOS POWER DISTRIBUTIONI                                ROOM. ON SOUTH WAU 10FT SOUTH OF                        Grand Respcnse Spectrum 121208VAC EMF RGENCY LOCAL                        EAST ENO OF AB EMERG DIESEL SHUTDOWN AUXIUARY                                  GENERATOR, 5'BOVE FLOOR.
DISTRIBUTION PANEL 91      17      247 ME. 0  DIESEL GENERATION. CONTROL 8                      AB EMER DSL GEN RM IN THE CENTER OF        587.00  Yes  Boundng Specuum vs. SSE                Yes            Yes    Yes 15MB          INSTRUMENTATIONI AB                                THE ROOM                                                Ground Response Spectrum EMERGENCY DIESEL GENERATOR 92      17      24ME-      0  DIESEL GENERATION, CONTROL 8                      CD EMER DSL GEN RM - IN THE CENTER OF      587.00  Yes  Boundng Specuum vs. SSE                Yes    Yos            Yes 15000          INSTRUMENTATION I CO                              THE ROOM, 10 FEET NORTH OF THE MAIN                    Ground Response Spectrum EMERGENCY DIESEL GENERATOR                        ENTRANCE ODOR 93      18    2CP~12      0  DIESEL JACKET WATER I AB          AUXILIARY      AB EMER DSL GEN RM-5 FEET WEST OF AB      587.00  Yes  Boundng Spsctnsn vs. SSE                      Yes            Yes EMERGENCY DIESEL JACKET                            EMERGENCY DIESEL GENERATOR ROOM                        Ground Response Specuum WATER PUMP QT.130ABL                              DOORWAY, IN CONTROL SVBPANEL &#xb9;2.0GAB.
DISCHARGE PRESSURE SWITCH                          ON THE NORTH WALL 94      18    2CP&314      0  DIESEL JACKET WATER AB I          AVXIUARY        AB EMER DSL GEN RM -5 FEET WEST OF AB      587.00  Yes  Boundng Spectrum vs. SSE              Y8$    Yes      Yes    Yes EMERGENCY DIESEL JACKET                            EMERGENCY DIESEL GENERATOR ROOM                        Ground Response Spectnsn WATER PUMP QT-130AB2                              DOORWAY, IN SUBPANEL &#xb9;2%GAB, ON THE DISCHARGE PRESSURE SWITCH                          NORTH WALL 95      18    2<PS<17      0  DIESEL JACKET WATER I Co          AVXIUARY        CDEMERDSLGENRM 5FEETWESTOF CO              587.00  Yes  Boundng Specuum vs. SSE        Yes    Yes    Y8$      Yes    Yes EMERGENCY DIESEL JACKET                            EMERGENCY DIESEL GENERATOR ROOM                        Ground Response Spectrum WATER PUMP QT-130CD1                              DOORWAY, IN SUBPANEL &#xb9;2<GCD, ON THE DISCHARGE PRESSURE SWITCH                          SOUTH WALL 96      18    2-CPS419    0  DIESEL JACKET WATERI CO            AUXILIARY      CD EMER DSL GEN RM - 5 FEET WEST OF CO    587.00  Yes  Bounrrng Specuum vs. SSE        Yes    Yes    Yos      Yes    Yes EMERGENCY DIESEL JACKET                            EMERGENCY DIESEL GENERATOR ROOM                        Grand Response Specuum WATER PUMP QT-130402                              DOORWAY, LN SUBPANEL &#xb9;247GCD. OM THE DISCHARGE PRESSURE SWITCH                          SOUTH WALL 18,    24LS-120    0  DIESEL FUEL OIL I AB EMERGENCY    AUXILNRY        ABEMERDSLGENRM- RELAYCHATTER              587.00  Yes  Boundng Specuurn vs. SSE              Yes            Y8$    Yes 0 IES EL FUEL OIL OAY TANKQT-                      ANALYSIS IS DONE UNDER FUEL TRANSFER                    Groorxl Response Specuum 107~ HIGH LEVEL SWITCH &#xb9;1                          PUMP 98      18    MLS.121      0  DIESEL FUEL OIL I AB EMERGENCY    AUXILIARY      AB EMER DSL GEN RM RELAY CHATTER          587.00  Yes  Bandng Spectrum vs. SSE                      Yes      Yes DIESEL FUEL OIL OAY TANKQT-                        ANALYSISIS DONE UNDER FUEL TRANSFER                    Grand Response Specuum 107~ LOW LEVEL SWITCH &#xb9;1                          PUMP 99      18    24.LS-122    0  DIESEL FUEL OIL I AB EMERGENCY    AVXIUARY        AB EMER DSL GEN RM - 'RELAY CHATTER        587.00  Yes  Boundng Specuum vs. SSE                Yes    Yes      Yes    Yos DIESEL FUEL OR. OAY TANKQT-                        ANALYSISIS DONE UNDER FUEL TRANSFER                    Grand Response Specuum 10748 HIGH LEVEL SWITCH &#xb9;2                        PUMP 100    18    MLS-123      0  DIESELFUELOR.IAB EMERGENCY        AUXiLIARY      AB EMER OSL GEN RM - 'RELAY CHATTER        587.00  Yes  Boundng Spearurn vs. SSE                              Yes    Yes DIESEL FUEL OR. OAY TANKQT                        ANALYSIS IS DONE UNDER FUEL TRANSFER                    Ground Response Specuum 107~ LOW LEVEL SWITCH &#xb9;2                          PUMP 101    18    24.LS-125    0  DIESEL FUEL OIL I CO EMERGENCY    AUXILIARY      CD EMER DSL GEN RM - 'RELAY CHATTER        587.00  Yes  Boundng Spectrum v>>. SSE        Y8$                    Yes    Yes DIESEL FUEL OIL OAY TANKQT-                        ANALYSIS IS DONE UNDER FUEL TRANSFER                    Ground Response Spectrum 1070 HIGH LEVEL SWITCH &#xb9;1                          PVMP 102    18    24.LS-1 26  0  DIESEl. FUEL OIL I CO EMERGENCY    AUXILIARY      CD EMER DSL GEN RM - 'RELAY CHATTER        587.00  Yes  Bouncbrg Specuurn vs. SSE      Yes          Y8$            Yes DIESEL FUEL OIL DAYTANKQT-                        ANALYSIS IS DONE UNDER FUEL TRANSFER                    Grand Response Spectrum 1070 LOW LEVEL SWITCH &#xb9;1                          PUMP 103    18    24ls-127    0  DIESEL FUEL OIL I CD EMERGENCY    AUXILIARY      CD EMER DSL GEN RM 'RELAY CHATrER          587.00  Yes  Boundng specuum vs. ssE        Yes                          Yes DIESEL FUEL OIL DAYTANKQT-                        ANALYSIS IS DONE UNDER FUEL TRANSFER                    Ground Resporle Spectrum 107CO HIGH LEVEL SWITCH &#xb9;2                        PUMP Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" Includes each entry and Conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed p fessional engineer.)
                                                                                          /Z/
Printor T pe Name                                Signature                      Dae                    Print or Type Name                            Si na re                    Date
 
Walkdown: V            f 10/04/93                                                          DC CO          ]IT 2                                                                                  Page 9 of 9 SCREENING VERIFICATI            DATA SHEET (SVDS) item  Eq. CI  Equy.to    Rev                                              Fker            Room or Row/Cohsnn              Base                Capacity vs.              . Cap>>  Cavaats      Interact No.
Equp No                                              Elev.                                            Bev.                Demand Basis              Demancrr  OK7    OK7    OK7    OK7 104    18    24.Ls-1 28  0  DIESEL FUEL OIL I CD EMERGENCY  AUXIUARY  587.00 CD EMER DSL GEN RM - 'RELAY CHATTER      587.00  Yes    Boundeg Spectrum vs. SSE            Yas    Yes          Yds    Yes DIESEL FUEL OIL DAY TANKQT-                      ANALYSISIS DokE UNDER FUEL TRANSFER                    Ground Rasper>>e Spectrum 107CD LOW LEVEL SWITCH &#xb9;2                        PUMP 105    18    2-XP 3400    0  DIESEL COMBUSTION AIR I AB      AUXILIARY 587.00 ABEMERDSLGENRM-SFEETWESTOFAB              587.00  Yes    Bounchng Spectrum vs. SSE                    Yes          Yas    Yes EMERGEkcY DIESEL FRONT BANK                      EMERGENCY DIESEL GENERATOR ROOM                        Grotstd Response AIR CHEST EXTREME HIGH                            DOORWAY, INSIDE DOUBLE DOORS OF PRESSURE SWITCH                                  CONTROL SUB PANEL &#xb9;24K>>AB. ON THE NORTH WALL                                                                Sped'oundsvg 106    18    Z.XPS405    0  DIESEL COMBUSTION AIRI CD        AUXILIARY 587.00 CO EMERDSL GEM RM-SFEETWEST OF CD        587.00  Yes            Specinsn vs. SSE                  Yes    Yes    Yas    Yes EMERGENCY DIESEL FRONT BANK                      EDG ROOM DOORWAY, INSIDE DOUBLE                        Ground Response Spectrum AIR CHEST EXTREME HIGH                            DOORS OF CD EMERGENCY DIESEL CONTROL PRESSURESWITCH                                    SUBPANEL &#xb9;24X>>CD. ON THE SOUTH WALL 107    19    2-vrs441    0  DIESEL ROOM VENTILATIONI AB      AUXILIARY 587.00 AB EMER OSL GEN RM - NORTHWEST REGION    587.00  Yas    Boundeg speci/um vs. SSE                    Yds  N/A    Yes    Yes EMERGENCY DIESEL GENERATOR                        OF ROOM, ON AB EMERG DIESEL GEN RM                      Ground Respoi>>e Spectrum ROOM VENTILATIONFANS HV.DGX-                      VENT EXHAUST FAN &#xb9;244V47GX-2. NEAR THE 2 THERMOSTAT                                      NORTH WALL 108    19    2-VTS446    0  DIESEL ROOM VENTIIATIONI CD      AUXILIARY 587.00 CD EMER DSL GEN RM - IN THE SOUTHWEST    587.00  Yes    Boundeg Spectrum vs. SSE            Yes    Yes  N/A    Yes    Y8$
EMERGENCY DIESEL GENERATOR                        CORNER OF THE ROOM. ON THE WEST SIDE                    Ground Response Spectrum ROOM VENTILATIONEXHAUST FAN                      OF CD EMERGENCY DIESEL GENERATOR HVDGX-1 THERMOSTAT                                ROOM VENTItATIOMEXHAUST FIRE 0  EQUIPMENT CONTROL AND            AUXILIARY 587.00 AB EMER DSL GEN RM - MIDDLE SOUTH        587.00  Yas    Boundeg Speci/um vs. SSE            Yas    Yes  Yds    Y8$    Yes INDICATIOMSTATIONS I AB                          REGION OF THE ROOM, 10 FEET NORTHWEST                    Ground Response Spectrum EMERGENCY DIESEL GENERATOR                        OF AUXILIARYBUILDNGVENTiLATIOk OME-150JIB CONTROL SUBPANEL                      EXHAUST UNIT &#xb9;24tv~-2 110    20    24X>>AB-X    0  EQUIPMENT CONTROL AND            AUXILIARY 587.00 AB EMER OSL GEN RM NEAR THE CENTER        587.00  Yes    Boundstg Speci/um vs. SSE            Yes    Yes  Y8$      No INDICATIONSTATIONS/AB                            OF THE WEST WALI 3 FEET kORTH OF AB                      Ground Response Spectrum EMERGENCY DIESEL GENERATOR                        EMERGENCY    DIESEL STARTNG AIR OME-1 50AB AUXILIARYSUB PANEL                    RECEIVER &#xb9;ZAT-14 MBI 1'll    20    247GC0      0  EQUIPMEMT CONTROL AND            AUXILIARY 587.00 CDEMERDSLGEMRM 5FEETWESTOF CD            587.00  Yes    Botndstg Spectrum vs. SSE                    Yes          Yes    Yas IMDI CATION STATIONS I CD                        EMERGENCY DIESEL GENERATOR ROOM                          Ground Response Spectrum EMERGENCY DIESEL GENERATOR                        DOORWAY, 4 FEET SOUTHEAST OF CD OME-1 50CO CONTROL SUBPANEL                      EMERGENCY DIESEL GENERATOR EXCITER 112    20    247GCD-X    0  EQUIPMEMT CONTROL AMD            AUXILIARY 587.00 CD EMER OSL GEM RM IN THE MIDDLEWEST      587.00  Yes    Boundstg speci/um vs. SSE                    Yds INDICATIONSTATIONS I CD                          REGION OF THE ROOM. 15 FEET SOU1H OF                    Ground Response S pectnsn EMERGENCY DIESEL GENERATOR                        CD EMERGENCY DIESEL STARTING AIR OME-1 5thco AUXILIARYSUBPANEL                    RECEIVER &#xb9;2<T-1414'Dt 113      0    2&v-1        0  STAR1'NG AIR SYSTEM I PILOT                                                                587,00  N/A  Judgement VS Raahate Madran                                  Yes    Yes AB          OPERATED 4 WAYVALVEFOR AIR                                                                              Cantered Fker Response Sprectra START XRVS FOR DIESEL ENGINE 114      0    24KW      0  STARTING AIR SYSTEM I PILOT                                                                587.00  N/A  Judgement VS Reahste Med>>n                    Yes          Yds    Y8$
CD          OPERATED 4 WAYVALVEFOR AIR                                                                              Cantered Fker Response Sprectrs START XRVS FOR DIESEL ENGINE 115      0    2~V      0  STARTING AIR SYSTEM I PILOT                                                                        NlA  Judgement vs Raahste Meehan                    Yas          Yes    Yes AB          OPERATED 4 WAYVALVEFOR AIR                                                                              Cantered Fbor Response Sprectra START XRVS FOR DIESEL ENGINE 116      0    2&OV.Z-      0  STARTING AIR SYSTEM I PILOT                                                                587.00  N/A  Judgement Vs Reahhte Madran            Yds    Yes  Yes    Yes CD          OPERATED 4 WAYVALVEFOR AIR                                                                              Cantered Fker Response Sprect/a START XRVS FOR DIESEL ENGINE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or Type Name                              Si nature
                                                                                      /s//
Date                    Print or Type Name
                                                                                                                                                          /              5 ~
ign ure
                                                                                                                                                                                    'Qyna        I    /Jgt Date
 
Walkdown: W            f 10/5/94                                                                DC CO            IT2                                                                              Page1of1 SCREENING VERIFICATION DATA SHEET (SVDS)
Item  Eq. CI  Equp.lo    Rev      System/Eqrspment Descnpten                Floor              Roonl of Row/Coaxnn            Base                  Capaccy vs.            Cap>  Caveats            Eqrap No.      No                                                Etev.                                            Elev.                Demand Bas'>>            Demand?  OK?    OK?          OK?
7    2&RV-170    0  LETDOWN (CVCS) / EXCESS        CONTAINMENT 612.00  REG EN HEAT XcrtGR RM - AT THE WEST END    612.00  Yes  Boundeg Specuum vs. SSE          Yes LETDOWN HEAT EXCHANGER HE-                          OF EXCESS LETDOWN HEAT EXCHANGER &#xb9;2-                    Ground Response Spectrum 13 1 AIR OPERATED OUTLET                            HE 13, WEST OF AIR OPERATED VALVE&#xb9;2 PRESSURE CONTROL VALVE                              QRV-171, 1 FOOT ABOVE THE 2      7    2<RV-171    0  LETDOWN (CVCS) / EXCESS        CONTAINMENT 612.00  REGEN HEAT XCHGR RM NEAR CENTER OF        612.00  Yes  Boundng Spectrum vs. SSE          Yes    Yes          Yes  Yes LETDOWN HEAT EXCHANGER HE-                          EXCESS LETDOWN HEAT EXCHANGER &#xb9;24lE-                    Ground Respor>>e Spectrum 13 1 AIR OPERATED OUTLET                            13,    1 FOOT ABOVETHE FLOOR DIVERSION VALVE 7      2~44        0  CCW/EXCESS LETDOWN HEAT        CONTAINMENT 612.00  REGEN HEAT XCHGR RM NEAR CONT WALI 612.00        Yes  Boundng Spectrum vs. SSE          Yes    Yes          Yes  Yes EXCHANGER HE-1 3 CCW OUTLET                        'I FT. FROM EXCESS LETDOWN HEAT                          Ground Response Spectrum SAFETY VALVE                                        EXCHANGER &#xb9;24IE 13. AZ 300.
24NNGS-      0  DIESEL ROOM VENTILAT/AS          AUXILIARY  596.00 INNER PLANT GROUNDS -50 FT NORTHWEST      587.00  Yes  Boundeg Spectrum vs. SSE          Yes    Yes          Yes DAB          EMERGENCY DIESEL GENERATOR                          OF RWST TANK&#xb9;12-TK43, ACESSIBLE FROM A                  Ground Respor>>e Spectrum ROOM VENTILATIONSUPPLY FAN                          MANHOLE NEAR THE 609 ELEVATIONAIR HV4)GS-I OUTSIDE AIR SHUTOFF                        INTAKEFILTER DAMPER 5      8    2-ICM405    0  RESIDUAL HEAT REMOVAL/            AUXII.IARY 591.00 VESTIBULE 15 FEET SOUTHEAST OF THE        587.00  N/A  1.5 x Boundrtg Spectrum vs.      Yes    Yes                Yes RECIRCUIATION SUMP TO EAST                          ROOM'S ENTRANCE DOOR, INSIDE EAST                      Rea1stic M<<fian Centered Floor RHR/CTS PUMPS SUCTION                              VALVEENCLOSURE TANK&#xb9;2-TK46                                    Response Spectra CONTAINMENT IS OtATION VALVE 8    2-ICM~      0  RESIDUAL HEAT REMOVAL/            AUXILIARY  591.00 VESTIBULE -10 FEET SOUTHEAST OF THE        587.00  N/A  1.5 x Boundrng Spectrum vs.      Yes    Yes RECIRCULATION SUMP TO WEST                          ROONrs ENTRANCE DOOR, INSIDE WEST                      Res%Itic M<<san Centered Floor RHR/CTS PUMPS SUCTION                              VALVEENCLOSURE TANK&#xb9;2-TK47                                    Rasper>>e Spectra CONTAINMENTISOLATIONVALVE Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or T pe Name                              Signature
                                                                                              */ Date J-              Print or T pe Name                              Signature
                                                                                                                                                                                                /- ~-2 Date
 
Walkdown:                f 10/5/95                                                              DC CO          IT 2 SCREENING VERIFICA            rt DATA SHEET (SVDS)
Item  Eq. Cl  Eqrsp.lo    Rev      System/Equipment 08SCrsXen              Fker              Room or Rcw/Cok/mn                                  Capacrty vs.                  Caveats      Int8faot Equip No.      No                                              Elev.                                                                  Demand Basis                    OK?    OK?    OK?    OK?
1    20        24 Gt      0  EQUiPMENT CONTROL AND            AUXILIARY 633.00 CONTROL ROOM - IN THE NORTHEAST          633.00        Bound<</9 Spectrum vs. SSE INDICATIONSTATIONS I REACTOR                      REGION OF THE ROOM, NEAR MIDDLEOF THE                  Ground Response Spectrum PROTECTION CONTROL GROUP &#xb9;1                        NORTH WALL CABINET &#xb9;14. 15, 16 2    20        2CG2      0  EQUIPMENT CONTROL AND            AUXILIARY 633.00 CONTROL ROOM - IN THE NORTHEAST          633.00  N/A  1.5 x Bound<<tg S pectrum vs.      Y8$          Yes    Yes INDICATIONSTATIONS /REACTOR                        CORNER OF THE ROOM. NEAR THE NORTH                    Reaastic Median Centered Fker PROTECTION CONTROL GROUP &#xb9;2                        WALL FULLWALKDOWMDONE DURING RHR                              Response Spectra CABINET&#xb9;17. &#xb9;18 & &#xb9;19 3    20        24:G3      0  EQUIPMENT CONTROL AND            AUXILIARY 633.00 CONTROL ROOM - IN THE NORTHEAST                        1.5 x Boundstg S pectnsn vs.      Y8$    Yes          Yes    Yes INDICATIONSTATIONS I REACTOR                      REGION OF THE ROOM, ON THE REAR SIDE                  Rear/stic Median Centered Fker PROTECTION CONTROL GROUP &#xb9;3                        OF RADIATIONMONITORING SYSTEM RACK I                          Response Spect/a CABINET &#xb9;20. &#xb9;21                                  PANEL &#xb9;24?MS4 0  EQUIPMENT CONTROL AND            AUXILIARY 633.00 CONTROL ROOM - IN THE NORTHEAST                        1.5 x Boundstg Spectrum vs,                                    Yes INDICATIONSTATIONS I REACTOR                      REGION OF THE ROOM, ON THE REAR SIDE                  Rea5slic Median Centered Fker PROTECTION CONTROL GROUP &#xb9;4                        OF RADIATIONMONITORING SYSTEM RACK I                          Response Spectra CABINET &#xb9;22. <<23. &#xb9;24. & &#xb9;25                      PANEL <<241MB-I 5    20      241PC-I    0  REACTOR PROTECTION I REACTOR      AUXILIARY 633.00 CONTROL ROOM - IN THE SOUTHWEST                  N/A  1.5 x Boundvtg Spectrum vs.                              No PROTECTION CHANNEL I CAB &#xb9;1, 2.                    REGION OF THE ROOM, ON THE REAR SIDE                  Reassdc Mefen Centered Fker 3&4                                                OF CONDENSATE HEATER LEVELCONTROL                              Response Spect/a PANEL &#xb9;24', NEAR CONDENSATE 6    20      24tPC4l      0  REACTOR PROTECTION I REACTOR      AUXILIARY 633.00 CONTROL ROOM - IN THE SOUTHWEST                        1.5 x Bound<<to Spectnsn vs.              Y8$  Yes      No PROTECTION CHANNEL II CABINET                      REGION OF THE ROOM. ON THE REAR SIDE                  Rearrstic M/xfran Centered Fker l/5,6&7                                            OF TURBINE CONTROL PANEL &#xb9;2-T. NEAR                            Response Spectra TURBINE PANEL REAR 7    20      241PC-! Il      REACTOR PROTECTION/REACTOR        AUXILIARY 633.00 CONTROL ROOM - IN THE SOUTHWEST          633.00  NIA  1.5 x Boundstg Spectrum vs.              Yes            No PROTECTION CHANNEL Ill CABINET                    REGION OF THE ROOM, ON THE REAR SIDE                  Rear/sue Median Conte/ed Fker
                                <<9, 10 & 11                                        OF STEAM GENERATOR AND AUXILIARYFEED                          Response Spectra PUMP COMTROL PANEL &#xb9;2-SG 6    20      24tpc-IV    0  REACTOR PROTECTION I REACTOR      AUXILIARY 633.00 CONTROL ROOM - IN THE SOUTHWEST                  N/A  1.5 x Bot<<tdstg Spectrum vs.                    Yes    Yes PROTECTION CHANNEL IV CABINET                      REGION OF THE ROOM, ON THE REAR SIDE                  Rearrssc Me/fran Centered Fker
                                <<12                                                OF CONDENSATE PUMP CONTROL PANEL &#xb9;2-                          Response Spectra CP Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and condusions. One signatory should be a licensed professional engineer.)
Print or T pe Name 4          Q        M Si nature I-/--7C Date                  Print or T pe Name                                Signat r lu ar te
 
Walkdown:      0        f 3I14/94                                                              DC CO            IT 2                                                                          Page  1 of1 SCREENING VERIFICATION DATA SHEET (SVDS) item  Eq. CI  Eqrsp. ID    Rev    System/Equrpmant Descnptron                                Room or Row/Column            Base                Ce peaty vs,          Csp >  Covests                Equip No.      No                                                                                                Eiev.              Demand Basis          Demand?  OK?                    OK?
244RV-152      0  NUCLEAR SILVIPLINGI STEAM      CONTAINMENT 612.00 W CONT LOWER VENT RM - ON THE            61 2.00 Yas  Boundng Spectrum vs. SSE              No            Yes GENERATOR &#xb9;2 STEAM SAMPLE                          CRANEWALLSIDE OF THE WALKWAY                          Ground Response specimen MSX-102 SAMPLE SHUTOFF VALVE 2      7    244RV.1 54    0  NUCLEAR SAMPLING I STEAM        CONTAINMENT 612.00 E CONT LOWER VENT RM - ON THE            612.00  YS$  Boundng Spectrum vs. SSE              No    NIA GENERATOR &#xb9;4 STEAM SAMPLE                          CRANEWALLSIDE OF THE WALKWAY,                          Ground Response Spectnrm MSX-104 SAMPLE SHUTOFF VALVE                      BETWEEN COLUMNS        &#xb9;6 AND &#xb9;7, 2 FEET ABOVE THE FLOOR 2$ V.122$      0  CCW I CCW TO CONT VENTILATION CONTAINMENT 625.00                    -
HVCEQ-2 FAN RM ON THE CRANEWALLSIDE      625.00  Yos  Boundng Spectrum vs. SSE                    NIA              Yos FAN HV<EQ-2 MOTOR AIR                              OF THE WALKWAY,1 FOOT F ROM VENT FAN                  Gnwnd Response Spectrum COOLER COW OUTLET SAFETY                          &#xb9;24IVCEQ-2, 10 FEET FROM COLUMN &#xb9;26. 4 VALVE                                              FEET ABOVE THE 625 EL PlATFORM 2$ V-1224      0  CCW I CONTAINMMENTVENT FAN CONTAINMENT 625.00      HVCEQ-1 FAN RM ON THE CRANEWALLSIDE      625.00  Yos  Bandng Spectrum vs. SSE        Yos HVCEQ-1 MOTOR AIR COOLER                          OF THE WALKWAY,1 FOOT FROM VENT FAN                    Gnwnd Response Spectrum CCW OUTLET SAFETY VALVE                            &#xb9;241V CEO-I, 15 FEET FROM COLUMN &#xb9;1.
NEAR THE GRATING 5      7                    0  CCW I REACTOR COOLANT PUMP      CONTAINMENT 617.00 LOWER CONT, QUAD NO. 1 BTWEEN            612.00      Bandng Spearum vs. SSE                Yos            Yes PP<5-1 THERMALBARRIER CCW                          REACTOR COOLANT PUMP &#xb9;1 AND SG &#xb9;1, ON                  Ground Response Spectrum OUTLET SAFElY VALVE                                THE SG SIDE OF 61 7 EL PLATFORM.
2$ V$2-2      0  I REACTOR CoolANT PUMP PP~ CONTAINMENT 617.00      LOWER CONTAINMENT,QUADRANT NO. 2-        612.00  Yas  Bandng Spectrum vs. SSE              Yes            Yes 2 THERMALBARRIER CCW OUTLET                        BETWEEN REACTOR COOLANT PUMP &#xb9;2+P-                    Ground Response Spectrum SAFETY VALVE                                      45.2 AND THE SHIELD WALIONTHE 617 ELEVATIOM PLATFORM.
7      7    2$ V$2$        0  I REACTOR COOLANT PUMP PP~      CONTAINMENT 612.00 LOWER CONTAINMENT, QUADRANT NO. 3 -      612.00  Yes  Boundng Spearum vs. SSE        Yes    Yes            Yes    Yes 3 THERMALBARRIER COW OUTLET                        8ElWEEN RCP &#xb9;3 AND STEAM GENERTOR C4                  Ground Response Spectrum SAF ElY VALVE                                      ON 618 ELEVATION PLATFORM.
2$ V$2%        0  I REACtOR CoolANT PUMP PP<5-    CONTAINMENT 612.00 LOWER CONTAINMENT, QVADRANTNO. 4-        612.00  Yos  Bandng Spectrum vs. SSE        Yos    Yes            Yes    Yes 4 THERMALBARRIER CCW OUTLET                        BETWEEN REACTOR CoolAMT PUMP &#xb9;4 AND                    Gnwnd Response Spectrum SAFEIY VALVE                                      SHIELD WAUON618 ELEVATIONPLATFORM.
9      8      2.IIAOAI      0  BORONINJEGTIONI BORON          CONTAINMENT 598.00 ANNULUS. QUAD NO. 1 - OM THE CRANEWALL            Yes  Bandng Spectrum vs. SSE        Yos    Yes  NIA      Yes INJECTION TO REACTOR COOLANT                      SIDE OF THE WALKWAY,10 FEET FROM                      Ground Response Spectrum LOOP &#xb9;1 SHUTOFF VALVE                              COLUMN &#xb9;2. 3 FEET ABOVE THE FLOOR 10      8      2.04042      0  BORON INJECTION I BORON        CONTAINMENT 59800  ANNULUS, QUAD NO. 2-ON THE CRANEWALL              Yes  Boundng Spectrum vs. SSE      Yes    Yos  NIA      Yes INJECTION TO REACTOR COOlANT                      SIDE OF THE WALKWAY                                    Gnwnd Response Spectrum LOOP &#xb9;2 SHUTOFF VALVE 11      8                    0  BORON INJECTION I BORON        CONTAINMENT 598.00 ANNULUS, QUAD NO. 3-ON THE CRANEWALI.            Yes  Boundng Spaarum vs. SSE                Yes  NIA      Yes INJECTION TO REACTOR COOlANT                      SIDE OF THE WALKWAY,10 FEET FROM                      Ground Response Spectrum LOOP &#xb9;3 SHUTOFF VALVE                              COLUMN &#xb9;18. 4 FEET ABOVETHE FLOOR 12      8                    0  BORON INJEGTIONI BORON          CONTAINMENT 598.00 ANNULUS, QUAD NO. 4 15 FEET FROM                  Yos  Boundng Spectrum vs. SSE              Yes INJECTION TO REACTOR COOLANT                      COLUMN &#xb9;9, 5 r EET ABOVE THE FLOOR, BY.                Ground Response Spectrum LOOP &#xb9;4 SHUTOFF VALVE                              THE    CRANEWALL 13    18      24FI$ 1      0  BORON INJECTION I BORON        CONTAINMENT 598.00 ANNULUS, QUAD NO. 1 NEAR THE                      NIA  1.5 x Boundng Spearurn vs.                  Yes INJECTION TO REACTOR COOLANT                      CRANEWALLSIDE OF THE WALKWAY,                        Reotsdc Morgan Centered Fkror LOOP &#xb9;1 FLOW INDICATOR                            BElWEEN          COLUMNS &#xb9;2 AND &#xb9;3, 4                      Response Spectra TRANSMITTER                                        FEET ABOVE THE FLOOR 14      7    2&RV-163      0  REACTOR COOIANT I REACTOR      CONTAINMENT 612.00 LOWER CONT. QUAD NO. 3-AT THE 612        612.00      Boundng Spectrum vs. SSE      Yos    Yes          Yes Coo lAMTLOOP &#xb9;3 TO                                ELEVATIONPLATFORM, ON THE CRANEWALL                    Grand Response Spectrum PRESSURI2ER SPRAY CONTROL 4                        SIDE OF    REACTOR COOLANT PUMP &#xb9;24'P-AIR OPERATED GLOBE VALVE                          45-3, 2 FEET ABOVE THE 612 EL 15    7    24IRV-164      0  REACTOR COOLANTI REACTOR        CONTAINMENT 612.00 LOWER CONT, QUAD NO. 3-AT 612            612.00      Bouodng Spectrum vs. SSE      Yos    Yos          Yes COOlANT LOOP &#xb9;4 TO                                PlATFORM ELEVATIOM,NEAR REACTOR                        Grourxi Response Spectrum PRESSURIZER SPRAY CONTROL 4                        COOLANT PUMP        &#xb9;24'P<5$ , ON THE AIR OPERATED GLOBE VALVE                          CRANEWALLSIDE OF THE WALKWAY Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" Includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries Print or T pe Name                                                                  Date                                                                                          Date
 
Walkdown:      1        3                                                                  DC CO          IT 2                                                                                Page1 of1 SCREENING VER.FICATI N DATA SHEET (SVDS)
Eq. CI    Equp.io  Rev                                            Floor            Room or Rowtcohann                                    Capacsy vs.            Cap>  Caveats              Equip No. No                                              Elev.                                                                  Demand Bas's            Demand?  OK?    OK?          OK7 7        2-SV I2I  0  I 2-DRA-300 SAMPLE HEAT          AUXILIARY 39 I.OO STARTUP BLOWDOWN FLASHTAh?t Rhl - IO FT                  Boundea Spectrum vs. SSE EXCIIANGERS CCW RETURN                            NW OF THE VESTIBULE DOORWAY                              Ground Response Spectrum HEADER SAFETY VALVE 7      2%RVAIO    0  / DEMINERALIZEDhlAKEUP WATER    AUXILIARY                                                    630.00        1.5 x Boundsta Spectrum Vs.              Ya                  Ya TO CCW SURGE TANK'A'.S AIR                                                                                Resinic Merfisn Centered Floor OPERATED SHUTOFF VALVE                                                                                            Response  Spectra 7      ~RVAI I    0  I DEh! INERALIZEDhtAKEUP WATER  AUXILIARY 630.00  HAI.LWAY                                                1.5 x Boundrta Spectrum vs.
TO CCW SURGE TAhl< '8'.S AIR                                                                              Realstic Metsan Centered Fkxx OPERATED S)BlrOFF VALVE                                                                                          Response  S    a Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
                                                                                    .tz /) alga Print or Type Name                              Signature                      Date                    Print or T pe Name                              Signature                Date
 
Walkdown: I/.          f 11/8/93                                                              DC CO          IT 2                                                                                Page1 of 6 SCREENING VERIFICATION DATA SHEET (SVDS)
Equp.lo    Rev                                              F acr            Room or Row/Column                                    Cspauty vs.            Cap>    Caveats            Equ4/
No.      No                                              Elev.                                                                  Demand Basis            Damarx/7  OK'7  OIQ          OK7 2-DCR401      0  NUCLEAR SAMPLINGIS'TEAM          AUXILIARY  591.00 VESTIBULE - ON THE EAST END, BELOW THE            N/A  1.5 x Bounding Spectrum vs.                      N/A    Yes  Yes GENERATOR &#xb9;1 BLOWDOWN                              PLATFORM GRATING                                      Reaasfic Median Centered Boor SAMPLE DSR401 CONTAINMENT                                                              m                        Response Spectra ISOLATIONVALVE 2<CR~        0  NUCLEAR SAMPLING I STEAM        AUXILIARY  591.00 VESTIBULE - ON THE EAST END, BELOW THE                  1.5 x Bounding Spectrum vs.                Yes          Yas  Y8$
GENERATOR &#xb9;2 8 LOWDOWN                            PlATFORM GRATING                                      ReaMc Median Centered Floor SAMPLE DSR402 CONTAINMENT                                                                                        Response Spectra ISOlATION VALVE 247CR~        0  NUCLEARSAMPLING/STEAM          AUXILIARY  591.00 VESTIBULE - ON THE EAST END. BELOW THE                  1.5 x Boundag Spectrum vs.                  Yes          Yes GENERATOR &#xb9;3 8 LOWDOWN                            Pl'ATFORM GRATING                                      Reahsdc Median Centered Boor SAMPLE DSR403 CONTAINMENT                                                                                        Response Spectra ISOlATION VALVE 247CR404      0  NUCLEAR SAMPLING/STEAM          AUXILIARY  591.00 VESTIBULE ON THE EAST END, BELOW THE                    1.5 x Bounding Spectrum vs.                Yes          Y8$  Yes GENERATOR &#xb9;4 BLOWDOWN                              PlATFORM GRATING                                      Rearisdc Median Centered Boor SAMPLE DSR404 CONTAINMENT                                                                                        Response Spectra ISOlATIONVALVE 24/CRQ10      0  BLOWDOWN I STEAM GENERATOR      AUXILIARY  591.00 STARTUP 8 LOWDOWN FLASHTANKRM - IN        609.00        1h x Boundstg Spectrum vs.                              Yes OMM-1 BLOWDOWN                                    THE NORTHEAST SECTION OF THE ROOLL 20                  Reaasdc Median Centered Boor CONTAINMENTISOIATIONVALVE                          FEET EAST OF      STARTUP BLOWDOWN                            Response Spectra FlASHTANK&#xb9;2-TK<9. ON THE 601 ELEVATION 24KR~        0  BLOWDOWN I STEAM GENERATOR      AUXILIARY  591.00 STARTUP BLOWDOWN FLASHTANKRM - IN        609.00        1.5 x Boundstg Spectnsn vs.                Yes          Yes  Yes OME4-2 BLOWDOWN                                    THE NORTHEAST SECTION OF THE ROOM. 20                  Rea issc Median Centered Fker CONTAINMENTISOLATIONVALVE                          FEET SOUTHEAST OF STARTUP BLOWDOWN                            Response Spectra FLASHTANK&#xb9;2-7K<9. ON THE 601 ELEVATION 2<CR~        0  BLOWDOWNI STEAM GENERATOR        AUXILIARY  591.00 STARTUP BLOWDOWN FLASHTANKRM - 15        609.00        1.5 x Boundsvg Spectrum vs.                      N/A    Yes OME~ BLOWDOWN                                      FEET NORTHEAST OF STARTVP BLOWDOWN                    R889$ 5c Median Centered Boor CONTAINMENT ISOLATION VALVE                        FLASHTANK&#xb9;Z-TK<9, ON THE 601 ELEVATION                        Response Spectra PLATFORM 0  BLOWDOWNI STEAM GENERATOR        AUXILIARY  591.00 STARTUP SLOWDOWN FlASHTANKRM IN                  N/A  1.5 x Bounding Spect/um vs,        Yes                  Yes  Yes OMEN-4 BLOWDDWN                                    THE NW PART OF THE ROOM. 20 FT. FROM                  ReaMc Median Cantered Boor CONTAINMENTISOlATIONVALVE                          STARTUP SLOWDOWN FLASHTANKZ-TK<9,                            Response Spectra ON THE 601 ELEVATIONPtATFORM 2&CR414      0  NITROGEN (REACTOR PLANT          AUXILIARY  591.00 STARTUP BLOWOOWN FLASHTANKRM - IN        567.00        1.5 x Bounding Spectrum vs.                              Y8$  .Yes SERVICE) I NITROGEN SUPPLY TO                      THE NORTHEAST REGION OF THE ROOOM, ON                  Realistic Median Centered Boor ACCUMUtATORTANKS                                  THE EAST SIDE OF THE 601 ELEVATION                            Response Spectra CONTAINMENTISOLATIONVALVE                          PlATFORM 10          2-IRV-260    0  SAFETY INJECTION I SAFETY                  587.00 S SAFETY INJ PMP RM IN THE SOUTHEAST      587.00  N/A  1.5 x Bets@leg Spectrum vs.        Yes                  Y8$
INJECTION TEST LINE SHUTOFF                        REGION OF THE ROOM, 6 FEET SOUTHEAST                  Rea!istic Median Centered Boor VALVE                                              OF SOUTH 8/'FEIY INJECTION PUMP &#xb9;2+P-                        Response Spectra 26S, NEAR THE SolflH WALL 24ICR-251    0  NUCLEAR SAMPLING I STEAM        AUXILIARY  591.00 VESTIBULE IN THE SOUTHEAST REGION OF              N/A  1.5 x Bounding Spectnsn vs.                              Yes GENERATOR &#xb9;1 STEAM SAMPLE                          THE ROOM. ON THE 596 ELEVATION                        Realsdc Median Centered Boor MSX-101 CONTAINMENTISOlATION                      PLATFORM, UNDER THE 601 ELEVATION                            Response Spectra VALVE                                              PLATFORM 12          244CR-252    0  NUCLEAR SAMPLING I STEAM        AUX/I.IARY 591.00 VESTIBULE - IN THE SOUTHEAST REGION OF                  1.5 x Bounding Spectnxn VS.        Yes      Yes          Yes GENERATOR I/2 STEAM SAMPLE                        THE ROOM, ON THE 596 ELEVATION                        Resrisdc Median Cantered Fker MSX-1 02 CONTAINMENTISOlATION                      PLATFORM, UNDER THE 601 ELEVATION                            Response Spectra VALVE                                              PlATFORM 13          24/ICR.253    0  NUCLEAR SAMPLING I STEAM        AUXILIARY  591.00 VESTIBULE - IN THE SOUTHEAST REGION OF                  1.5 x Bounding Spect/um vs.                              Yas GENERATOR &#xb9;3 STEAM SAMPLE                          THE ROOM. ON THE 596 ELEVATION                        Rearis5c Median Centered Fker MSX-103 CONTAINMENTISOLATION                      PLATFORM. UNDER THE 601 ELEVATION                            Response Spectra VALVE                                              PLATFORM Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or T pe Name
                                                )    c  .,O.
                                                          " Signature M        0      l2/i<a/~>
Date                    Printor T pe Name                                Signature
(-rg- fg Date
 
Walkdown: ti.          of 11/8/93                                                            DC CO            IT 2                                                                                      Page 2 of 6 SCREENING VERIFICATION DATA SHEET (SVDS)
Eq. Ci  Equip Io  Rev      Sfstem/Equpmenl Descnpicn              Fkxx              Roorri or Rovr/CO4lnn                    Base                                            Cap >  Caveats    Interact Equip No.      No                                              Eiev.                                                      Ek/v.                                          Dan axi?  OK?    OK?  OK?    OK?
14          24ICR-254    0  NUCLEAR SAMPLING I STEAM        AUXILIARY 591.00 VESTIBULE - IN THE SOUTHEAST REGION OF                            1.5 x Bourxing Specuum vs.        Yes      Yes  N/A  Y85    Yes GENERATOR $ 4 STEAM SAMPLE                        THE ROOM. ON THE 596 ELEVATION                                  ROSS$ 5c  Median Centered Fkor MSX-104 CONTAINMENTISOLATION                      PLATFORM. UNDER THE 601 ELEVATION                                      Response Spectra VALVE                                            PLATFORM 15          2&RV-251      0  CHARGING(CVCS)/CVCS              AUXILIARY 587.00 RECIPROCATING CHARG PMP RM - IN THE                              1.5 x Boundrig specaum vs.                                      Yes CENTRIFUGAL CHARGING PUMPS                        NORTHEAST PART OF THE ROOM, 3'AST OF                            Reafistic Median Centered Fkor DISCHARGE FLOW 3 AIR                              THE NORTH END OF RECIPROCATING                                          Respcnse Spectra OPERATED CONTROL GLOBE                            CHARGING PUMP //2+P49, 2 FEET ABOVE VALVE                                            FLOOR 16          243RV421      0  BORON MAKEUP (GVCS) I SOUTH      AUXILIARY 587.00 BORIC ACID STOR TANKAREA - IN THE                                1.5 x Boundng Spectrum vs.          Yes      Yes  N/A  Yes    Yes BORIC ACID FILTER TO Cvcs                        SOUTHEAST REGION OF THE ROOM, T                                  Realstic Median Centered Fker CHARGING PUMPS AND SOUTH                          SOUTHEAST OF SOUTH BORIC ACID                                          Response Spectra BORIC ACID BLENDER 1 AIR                          sT0RAGE TANK<<2-TK42s. 2 FEET ABovE THE OPERATED FLOW CONTROL                            FLOOR GLOBE VALVE 17          24)RV430      0  BORON MAKEUP (GVCS) I SOUTH      AUXILIARY 587.00 BORIC ACID STOR TANKAREA - IN THE                          N/A  1.5 x Bounding Spectrum vs.        Yes      Y8$
BORIC ACID STORAGE TANKTK-                        SOUTHEAST REGION OF THE ROOM,                                    ROSSSSc  Mafian Centered Fk>sr 12S 2 AIR OPERATED INLET FLOW                                OF SOUTH BORIC ACID STORAGE 1'OUTHEAST Response Spectra CONTROL GLOBE VALVE                              TANK82 TK126. 2 FEET ABOVE THE FLOOR 18            26V-101      0  NITROGEN (REACTOR PLANT          AUXILIARY 591.00 STARTUP BLOWDOWN FLASHTANKRM 20                            N/A  1.5 x Bounding Spectrum vs.        Yes      Y8$  N/A  Yes SERVICE) I NITROGEN SUPPLY                        FEET SoulHEAST OF THE BLOWDOWN TANK.                            Resist)a MaSan Centered Roor HEADER TO ACCUMULATORTANKS                        ABOVE GRATING. NEAR THE CONTAINMENT                                    Response Spectra SAFElY VALVE                                      WALL 19            26V-166      0  CCW/ POST&CCIDENT SAMPLE        AUXILIARY  587.00 NUCLEAR SAMPUNG RM - ON THE UNIT 2                                1.5 x Bounding Spectrum vs.        Yes    Y8$    N/A          Yes HEAT EXCHANGER CCW RETURN                        SAMPLE RACK'Iy, ON THE EAST WALL,AT THE                          ROOSstic  Marian Centered F kcr HEADER SAFElY VALVE                              SOUTH END OF THE RACK, 8 FEET ABOVETHE                                  Response Spectra FLOOR 26V66      0  LETDOWN (CVGS) I CVCS            AUXILIARY 587.00 RECIPROCATING CHARG PMP RM-                                      1.5 x Bcxxxtng Spectrum vs.                Yes                  Yes CHARGING PUMPS SUCTION                            SOUTHEAST OF THE PUMP, 9 FEET ABOVE                              RSSSstic  Mafian Centered Fkior HEADER SAFETY VALVE                              THE FLOOR                                                              Re        S 21            26V60      0  COMPONENT COOUNG WATER I        AUXILIARY  650.00 650 HALLWAY ON TOP OF THE COMPONENT                        N/A  1.5 x Boundng Spec@urn vs.          Yes    Yes    N/A  Yes    Yes COMPONENT COOLING WATER                          COOLING WATER SURGE TANK                                        ROSSstic  Mafian Centered Fkcr SURGE TANKTKQ? SAFETY VALVE                                                                                              Re        S
                                                                                                                                                          ~
0  CCW I LETDOWN HEAT              AUXILIARY 633.00 633 HALLWAY- 5 FEET EAST OF FREIGHT                              1.5 x Bounding Speci/um vs.        Yes    Y8$                  Yes EXCHANGER HE-14 COW OUTLET                        ELEVATOR SOUTH DOOR, NEAR THE EAST                              ROSSsuc Median Centered Fkor SAFETY VALVE                                      WALL, 12 FEET ABOVE THE FLOOR                                          Re        S 0  CCW I CCW To SOUTH BORIC AGIO  AUXILIARY  587.00 587 HALLWAY- NORlH OF THE SOUTH BORIC                            1.5 x          S pact/um vs.      Yes    Yes    N/A EVAP DRUM 12+IE-194)s SAFHY                      ACID EVAPORATOR ROOM DOORWAY. 597                                ReaS$ 5c  Mafian Centered Fkcr VALVE                                            ELEVATION P; ATFORM, ON THE WEST WALL                                  Re        S      8 24          2-SV67-1      0  CCW/ FAILED NVCLLEARFUEL        AUXILIARY  587.00 REFUEL WTR PURIFICATION PMP RM 7 FEET                      N/A  1.5 x Boundng Speci/um vs.                  Y8$    N/A DETECTOR SAMPLE HEAT                              NORTH OF THE DOORWAY. 0 N lHE WEST                              Realstic Marian Centered Fkxx EXCHANGER QC601.13 CCW                            WALL6 FEET ABOVE THE FLOOR                                              Response Spectra OUTLET SAF HY VALVE 25          2.SV67-2      0  CCWI NUCLEAR SAMPLING          AUXILIARY  587.00 NUCLEAR SAMPLING RM - ON UNIT 2 SAMPLE                            1.5 x Bounding Spectrum vs.        Yes      Yes SAMPLE RACK A CCWRETURN                          RACK A LOCATED IN THE NORTHWEST                                  RoaSstic Median Centered Boor HEADER SAFElY VLVE                                AREA OF THE ROOM, NORTHERN END OF THE                                  Response Spectra RACK 26V676      0  CGW/NUCLEAR SAMPLING            AUXIUARY  587.00 NUCLEAR SAMPLING RM - ON UNIT 2 SAMPLE                            1.5 x Bounding Spectnxn vs.        Yes      Y8$
SAMPLE RACK B CCW RETURN                          RACK B LOCATED ON THE EAST END WALL                              RoaSstic MaSan Centered Boor HEADER SAFETY VALVE                              SOUTHERN END OF THE RACK                                                Re        S Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or Type Name                              Si nature                        Date                            Print or Type Name                                Si nature                Date
 
Walkdown:      t        of 11/8/93                                                                            DC C          NIT 2                                                                              Page 3 of 6 SCREENING VERIFICATION DATA SHEET (SVDS)
Ett. Ci  Eqvp. ID  Rev      Srst<<n/Equiprtent Descnptxxt                Busdeg. Fker              Room or Row/Column              Base                                          Cap >  Caveats            Equip No,      No                                                            Eiev.                                            Eiev.                                        Demand?  OK?    OK?        OK?
27            2<V-72W      0  COMPONENT COOLING WATER /                      AUXILIARY 633.00 633 HALLWAY- 25 FEET SOUTH OF THE                        1.5 x Boundsvg Speci/um vs,      Yes                Yes    Yes WEST RESIDUAL HEAT REMOVAL                                      FREIGHT ELEVATOR SOUTH DOOR. ABOVE                      Rear>>dc M<<f>>n Centered Fkcr HEAT EXCHANGER COMPONENT                                        THE STAIRWAYENCLOSURE AT 645                                  Response Spectra COOLING WATER OUTLFT SAF Elv                                    ELEVATIOM,AT THE EAST WALL VALVE 28                          0  REFUELING WATER STORAGE                        AUXILIARY 587.00 S SAFETY INJ PMP RM - IN THE NORTHEAST    587.00  N/A  1.5 x Boundng Spectrum vs.        Yes          N/A        Yes TANKSUPPLY / SAFHY INJECTIOM                                    REGION OF THE'OOM                                      Realstic M<<f>>n Centered Fioor PUMPS SUCTION HEADER SAFElY                                                                                                    Response Spectra VALVE 0  SAFElY INJECTION/NORTH                          AUXILIARY 587.00 N SAFETY INJ PMP RM - EAST OF NORTH        587.00  N/A  1.5 x Boundstg Speci/um vs.      Yes          N/A        Yes SAFElY INJECTION PUMP PP-26N                                    SAFETY INJECTION PUMP &#xb9;2+P-26N. 6 FEET                  R881sdc Median Centered Fkgr DISCHARGE HEADER SAFETY                                          ABOVE THE FLOOR                                                Response Spectra VALVE 2<V-986      0  SAFETY INJECTION / SOUTH                        AUXILIARY 587.00 S SAFETY INJ PMP RM - SOUTHEAST REGION    587.00  N/A  1.5 x BoundIng Spectrum vs.      Yes    Yes    N/A  Yes    Yes SAFETY INJECTION PUMP PP.26S                                    OF THE ROOM                                            Rear>>dc M<<f>>n Centered Fker DISCHARGE HEADER SAFETY                                                                                                        Res por>>e Spectra VALVE 3'I          2CCM451      0  COMPONENT COOLING WATER/                        AUXILIARY 591.00 STARTUP SLOWDOWN FlASHTANKRM - IN                        1.5 x Boundsvg Speci/um vs.      Yes    Yes    N/A        Yes RC PUMPS BEARING OIL COOLERS                                    THE MIDDLE EAST REGION OF THE ROOM. 20'E Rear>>dc Meden Centered Fker CCW RETURN HEADER TRAIN                                              OF STEAM GENERATOR STARTUP                                Respor>>e Spectra ISOLATIONVALVE                                  BLOWDOWN FLASHTANK&#xb9;2.TK49, 5'BOVE
                                                                'A'ONTAINMENT THE 596'LEV. PlATEFORM 2CCM452      0  COMPONENT COOUNG WATER/                        AUXILIARY 591.00 STARTVP 6 LOWDOWN FLASHTANKRM 12          587.00  N/A  1.5 x Bounding Spectnsn vs.      Yes          N/A        Yes Rc PUMPS BEARING OIL COOLERS                                    FEET SOUTHEAST OF STEAM GENERATOR                      ROOMc Median Centered Fker CCW RETURN HEADER TRAIN 'F                                      STARTUP SLOWDOWN FlASHTANK&#xb9;2-TK49, 4                          Response Spectra CONTAINMENTISOlATIONVALVE                                        FEET ABOVE THE 596 ELEVATIONPLATFORM 2<CM453      0  COMPONENT COOLING WATER/                        AUX/LIARY 591.00 STARTVP SLOWDOWN FLASHTANKRM -30          587.00  N/A  1.5 x Bounds/g Spectrum vs.      Yes                Yes RCP THERMALBARRIER                                              FEET SOUTHEAST OF STEAM GENERATOR                      Rear>>tic Median Centered Fkxx COMPONENT COOLING WATER                                          STARTVP SLOWDOWN FLASHTANK&#xb9;2-TK49,                            Response Spectra OUTLET TRAIN'A'ONTAINMENT                                        ON THE 596 ELEVATIONPLATFORM ISOLATIONVALVE 0  COMPONENT COOLING WATER/                        AUXILIARY 591.00 STARTUP BLOWDOWN FLASHl'ANKRM - 30        587.00  N/A  1.5 x Boundeg Spectrum vs.        Y8S    Yes Rc PUMPS THERMALBARRIER                                          FEET SOUTH OF STEAM GENERATOR                          Rear>>tic Median Centered Fhor CCW RETURN HEADER TRAIN                                          STARTUP BLOWDOWN FlASHTANK &#xb9;2-TK49,                            Response Spectra ISOlATIONVALVE'B'ONTAINMENT ON THE 596 ELEVATION PlATFORM 2<CM458      0  COMPONENT COOUNG WATER/                        AUXILIARY 591.00 STARTUP BLOWDOWN FlASHTANKRM - 3          587.00  N/A  1.5 x Bounding Spectrum vs.      Yes    Yes                Yes COMPONENT COOLING WATER TO                                      FEET SOUTH OF STEAM GENERATOR                          Rear>>dc Median Centered Fkxsr REACTOR COOLANT PUMPS TRAIN                                      STARTUP BLOWDOWN FLASHTANK&#xb9;2-TK49,                            Response Spectra
                                'A'ONTAINMENTISOlATION                                          ON THE EAST SIDE OF THE PIPE lUNNEL VALVE 2CCM459      0  COMPONENT COOLING WATER/                        AUXILIARY 591.00 STARTUP BLOWDOWM FLAS HTANKRM - 6          587.00  N/A  1.5 x BoundIng Spectrum vs.      Yes    Yes                Yes COMPONENT COOLING WATER TO                                      FEET SOUTH OF STEAM GENERATOR                          Rear>>dc Median Centered Boor REACTOR COOLANT PUMPS TRAIN                                      STARTUP SLOWDOWN FLASHTAMK&#xb9;2-TK49,                            Response Spectra
                                'F CONTAINMENTISOLATION                                          ON THE EAST EDGE OF THE PIPE TUNNEL VALVE 37            2%MO429      0  COMPONENT COOLiNG WATER /                      AUXILIARY 633.00 633 HALLWAY- 25 F EEl'OUTH OF THE                        1.5 x BoundIng Spectrum vs.                          Y8S    Yes WEST RHR HEAT EXCHANGER HE-                                      FREIGHT ELEVATOR SOUTH DOOR. AT THE                    Reat>>dc Median Centered Fker 17W CCW OUTLET SHUTOFF VALVE                                    STAIR ENCLOSURE AT 645 EL, NEAR EAST                          Respor>>8 Spectra WALL 15 FEET UP Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "Allinformation" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT. All signatories should agree with all the entries and conclusions. One signatory should be a licensed professional engineer.)
Print or T pe Naine                                            Signature lL/I( /O>
Date                    Print or Type Name                              Signature              Date
 
Walkdown: V,              f 11/8/93                                                                DC CO            IT 2                                                                                Page 4 of 6 SCREENING VERIFICATI N DATA SHEET (SVDS)
Eq. CI    Equip. ID  Rev      67$ tem/Equipment Descnptxxl                                  Room or Row/Cobmn                                                              Cap >    CaveaLS No.        No Equp Demand7    OK7    OK7        OK'7 8    24'MO-221      0  AUXILIARYFEEDWATER I TURBINE        AUXILIARY 591,00 STARTUP SLOWDOWN FLASHTANKRM IN            587.00  N/A  1.5 x Boundeg Spectrum vs.        Yes      Yes  NIA  Yes
                                                                                                                                                                                          .                    Y8$
DRIVEN AUXILIARYFEED PUMP PP-                        THE SOUTH PART OF THE ROOM, NEAR THE                    Reafistb Median Centered Fker 4 DISCHARGE TO STEAM                                PIPE TVNME 30 FEET SOUTH OF STARTVP                              Response Spectra GENERATOR OME4-2 4 MOTOR                            SLOWDOWN FLASHTANK&#xb9;2.TK49, NEAR THE OPERATED CONTROL VALVE                              FLOOR 39      8    24:MO.222      0  AUXILIARYFEEDWATER/ EAST            AUXILIARY 591.00 STARTUP SLOWDOWN FLASHl'ANKRM - IN          587.00  N/A  1.5 x Boundsvg Speci/um vs.        Y8$      Yes  NIA  Yes    Yes MOTOR DRIVEN AUXILIARY                              THE SOUTH PART OF THE ROOM. NEAR THE                    Realstic Median Centered Fbor FEEDWATER PUMP PP4E SUPPLY                          PIPE TUNNEL 35 FEET SOUTH OF STARTUP                            Response Spectra To STEAM GENERATOR OME4-2 4                          SLOWDOWN FLASHTANK&#xb9;2-TKR9, NEAR THE MOTOR OPERATED CONTROL                              FLOOR VALVE 8    2+MD-231      0  AUXILIARYFEEDWATER/TURBINE          AUXILIARY 591.00 STARTUP BLOWDOWN FLASHTANKRM - IN          587.00  N/A  1.5 x Boundstg Speotfum VS.        Y8$      Yes        Yes    Yes DRIVEN AUXILIARYFEED PUMP                            THE SOUTH END OF THE ROOM, NEAR THE                      Realistic Medkn Centered Fbor SUPPLY TO STEAM GENERATOR                            PIPE TUNNEI 40 FEET SOUTH OF STARTVP                            Response Spectra OMEGA 4 MOTOR OPERATED                              SLOWDOWN FLASHTANK&#xb9;2-TK<9, NEAR THE CONTROL VALVE                                        FLOOR 41      8    2+MD-232      0  AUXILIARYFEEDWATER/EAST            AUXILIARY 591.00 STARTVP BLOWDOWN FLASHTANKRM N              587.00  N/A  1.5 x Bourxing Speci/um vs.        Y8$                        Y8$
MOTOR DRIVEN AUXILIARY                              THE SOUTH END OF THE ROOM. NEAR THE                      Reasstb Median Centered Fbor FEEDWATER PUMP PPQE SUPPLY                          PIPETUNNEI 45FEET SOUTHOFSTARTUP                                Response Spectra TO STEAM GENERATOR OME~ 4                            BLOWDOWN FLASHTANK&#xb9;2-TKP9. NEAR THE MOTOR OPERATED CONTROL                              FLOOR VALVE 42      8    2-ICM-260      0  SAF ETY INJECTION I NORTH          AUXILIARY 587.00 N SAFETY NJ PMP RM - ON THE NORTH WALL. 587.00      N/A  1.5 x Bouche Spectrum vs.          Yes SAFETY INJECTION PUMP PP-26M                        3 FEET NORTH OF NORTH SAF Elv IMJECTION                  Reasstb Median Centered Fbor DISCHARGE CONTAINMEMT                                PUMP ad'P-26N, 3 FEET ABOVE THE FLOOR                            Response Specua ISOLATIONVALVE 8    2-ICM-265      0  SAFETY INJECTION I SOUTH            AUXILIARY 587.00 S SAFETY INJ PMP RM - IN THE SOUTHEAST      587.00  N/A  1.5 x Boundng Spectrum vs.        Yes      YSS  N/A  Yes    Yes SAFHY INJECTION PUMP PP-26S                          REGION OF THE ROOM. 3 FEET SOUTHEAST                    Rearrsdc Median Centered Fker DISCHARGE CONTAINMENT                                OF SOUTH SAFETY INJECTION PUMP &#xb9;2+P-                            Response Spectra ISOLATIONVALVE                                      26S. ON lHE EAST WALL 44      8    2-IMO-261      0  REFUELING WATER STORAGE            AUXILIARY 587.00 S SAFETY INJ PMP RM N THE NORTHEAST        587.00  N/A  1.5 x Boundeg Spectrum vs.                  Yes  NIA  Yes    Yes TANKSUPPLY I REFUELING WATER                        CORNER OF THE ROOM. 3'ORTHEAST OF                        Rearrsdc Median Centered Fker STORAGE TANKTK43 SUPPLY TO                          SOUTH SAFETY INJECTION PUMP &#xb9;2+P-268, 3                          Response Spectra SAFHY INJECTION PUMPS                                FEET ABOVE THE FLOOR SHUTOFF VALVE 8    2.IMO-262      0  REFUEUNG WATER STORAGE              AUXILIARY 587.00 N SAFHY INJ PMP RM 5 FEET NORTHEAST        587.00  N/A  1.5 x Brxndng Spectrum vs.        Y8$      Yes        Yes    Yes TANKSUPPLY I SAFETY N J ECTION                      OF NORTH SAFETY INJECTION PUMP &#xb9;24'P-                    Rearrsdc Metfen Centered Fkor PUMPS RECIRC TO REFUELING                            26M, ONTHEEASTWALL.3FEETABOVETHE                                Response Spectra WATER STORAGE TANKTK43                              FLOOR TRAIN 'A'HUTOFF VALVE 8    24M 0-263      0  REFUELING WATER STORAGE            AUXILNRY  587.00 N SAFETY INJ PMP RM - ON THE EAST WALI3 587.00    N/A  1.5 x Boundstg Spect/um vs.                            Yes TANKSUPPLY/SAFElY INJECTION                          FEET EAST OF NORTH SAFETY IMJECTION                      Rearrstic Median Centered Fker PUMPS RECIRC TO REFUELING                            PUMP &#xb9;2+P 26N, 4 FEET ABOVE THE FLOOR                            Response Spectra WATER STORAGE TANKTK43 TRAIN 'Ir SHUTOFF VALVE 47      8    2-IMO-270      0  SAFElY INJECTION I SAFETY          AUXILIARY 587.00 N SAF ETY INJ PMP RM - IN THE SOUTHEAST    587.00  N/A  1.5 x Boundstg Spectrum vs.                  Yes        Yes INJECTION PUMPS DISCHARGE                            PART OF THE ROOM. 5 FEET SOUTHEAST OF                    RSSMc Median Centered Fker CROSSTIE TRAIN 'A'HUTOFF                            NORTH SAFETY INJECTION PUMP &#xb9;24'P-26N, 5                        Response Spectra VALVE                                                FEET ABOVE THE FLOOR Certification:
All the information contained on this Screening Verification Data Sheet (SVDS) is, to the best of our knowledge and belief, correct and accurate. "All information" includes each entry and conclusion (whether verified to be seismically adequate or not).
Approved: (Signatures of all Seismic Capability Engineers on the Seismic Review Team (SRT) are required; there should be at least two on the SRT.-AII signatories should agree with all the entries and condusions. Oiie signatory should be a licensed professional engineer.)
                                                                                            ~z/<<~s            >
Print or T pe Name                                  Signature                        Date                    Print or T pe Name                                Si nature                Date}}

Latest revision as of 14:02, 7 January 2025

DC Cook Nuclear Plant USI A-46 Seismic Evaluation Rept
ML17333A282
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/31/1995
From:
STEVENSON & ASSOCIATES
To:
Shared Package
ML17333A281 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, NUDOCS 9602050080
Download: ML17333A282 (484)