{{#Wiki_filter: April 13, 2017  Mr. G. T. Powell
[[Issue date::April 13, 2017]]
Executive Vice President and CNO
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, TX 77483  SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND
EXPERIMENTS INSPECTION (05000498/2017007 AND 05000499/2017007) AND REQUEST FOR INFORMATION  Dear Mr. Powell:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant
modifications at your South Texas Project Electric Generating Station from May 22-26, 2017.  The inspection will consist of three reactor inspectors from the NRC's Region IV office for one week.  The inspection will be conducted in accordance with NRC Inspection
Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments." 
Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff.  In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. 
Please note that the documents are requested to be provided by May 15, 2017.  Upon review of these documents, the inspectors will select additional documentation for review upon arrival.  It
is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing
organization.  If there are any questions about this inspection or the material requested, please contact the lead inspector, Chris Smith, by telephone at 817-200-1095 or by e-mail at Chris.Smith@nrc.gov. 
This letter does not contain new or amended information collection requirements subject 
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 
G. Powell 2  requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).    Sincerely,    /RA/      Thomas R. Farnholtz, Chief  Engineering Branch 1
Division of Reactor Safety
  Docket Nos. 50-498 and 50-499
License Nos. NPF-76 and NPF-80   
Enclosure:  
Evaluations of Changes, Tests,    and Experiments Inspection    Request for Information
cc: Electronic Distribution for STP
   
G. Powell 3  SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS INSPECTION
(05000498/2017007 AND 05000499/2017007) AND REQUEST FOR INFORMATION -  April 13, 2017 DISTRIBUTION: KKennedy, RA
SMorris, DRA
TPruett, DRP AVegel, DRS JClark, DRS
RLantz, DRP
JBowen, RIV/OEDO
KFuller, RC VDricks, ORA JWeil, OCA
LRenger, NRR
AMoreno, RIV/CAO
BMaier, RSLO THipschman, IPAT EUribe, IPAT
MHerrera, DRMA
RIV ACES 
NTaylor, DRP
DProulx, DRP JMelfi, DRP SJanicki, DRP
FSanchez, DRP
NHernandez, DRP
HWright, DRP 
  ADAMS ACCESSION NUMBER:  ML17103A627  SUNSI Review  ADAMS:    Non-Publicly Available  Non-Sensitive Keyword:  By:  TFarnholtz  Yes    No  Publicly Available  Sensitive  NRC-002 OFFICE RI:EB1 C:EB1    NAME CSmith TFarnholtz    SIGNATURE /RA/ /RA/    DATE 4/12/17  4/13/17    OFFICIAL RECORD COPY 
  Enclosure Request for Information Evaluations of Changes, Tests, and Experiments Inspection South Texas Project Electric Generating Station, Units 1 and 2 
Inspection Report:  05000498/2017007; 05000499/2017007
Inspection Dates:  May 22-26, 2017
Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments" 
Lead Inspector:  Chris Smith, Reactor Inspector 
Information Requested for the In-Office Preparation Week  The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by May 15, 2017, to the attention of Chris Smith.  We request that you
categorize the documents in your response with the numbered list below.  If only hard copies of the requested documents are available or if the electronic format is too large, please inform the lead inspector and provide the documents on the first day of the on-site inspection.  Also, the
inspectors will select specific items from the information requested below and request from your staff additional documents needed during the on-site inspection weeks.  We ask that the specific
items requested be available and ready for review on the first day of inspection.  If you have any questions regarding this information request, please contact the lead inspector as soon as possible.  1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.  2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully implemented changes, tests, and experiments performed since the last triennial modification inspection that did not result in an evaluation.  3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes, tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that
did not result in an application for a license amendment.    4. A list with descriptions of all temporary plant modifications implemented since the last triennial 10 CFR 50.59 inspection.
5. A list with descriptions of all compensatory actions for degraded or non-conforming conditions implemented since the last triennial 10 CFR 50.59 inspection.  6. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial 10 CFR 50.59 inspection.    7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates.  8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates. 
  2  9. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.  10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 programs.    11. A copy of the most recent submittal of the report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each, required by 10 CFR 50.59(d)(2).    12. A list of systems and system designators and a set of one-line (i.e., simplified) system diagrams.  Note:  Descriptions should be brief but of sufficient detail to ensure that inspectors can determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Inspector Contact Information:
Chris Smith Reactor Inspector
817-200-1095
Chris.Smith@nrc.gov 
Wes Cullum Reactor Inspector
817-200-1563
Wes.Cullum@nrc.gov
  Nnaerika Okonkwo Reactor Inspector
817-200-1114
Nnaerika.Okonkwo@nrc.gov
  Mailing Address: 
U.S. NRC, Region IV
Attn:  Chris Smith
1600 East Lamar Blvd. Arlington, TX 76011-4125 


Mr. G. Executive Vice President and CNO STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS INSPECTION (05000498/2017007 AND 05000499/2017007) AND REQUEST FOR INFORMATION
==Dear Mr. Powell:==
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant modifications at your South Texas Project Electric Generating Station from May 22-26, 2017. The inspection will consist of three reactor inspectors from the NRC's Region IV office for one week. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments."
Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by May 15, 2017. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Chris Smith, by telephone at 817-200-1095 or by e-mail at Chris.Smith@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/ Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety
Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80
===Enclosure:===
Evaluations of Changes, Tests, and Experiments Inspection Request for Information
cc: Electronic Distribution for STP
}}
}}

Revision as of 03:26, 21 March 2018

South Texas Project Electric Generating Station- Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000498/2017007 and 05000499/2017007) and Request for Information
ML17103A627
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/13/2017
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Powell G T
South Texas
References
IR 2017007
Download: ML17103A627 (5)


See also: IR 05000498/2017007

Text

April 13, 2017 Mr. G. T. Powell

Executive Vice President and CNO

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483 SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND

EXPERIMENTS INSPECTION (05000498/2017007 AND 05000499/2017007) AND REQUEST FOR INFORMATION Dear Mr. Powell:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant

modifications at your South Texas Project Electric Generating Station from May 22-26, 2017. The inspection will consist of three reactor inspectors from the NRC's Region IV office for one week. The inspection will be conducted in accordance with NRC Inspection

Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments."

Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by May 15, 2017. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It

is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing

organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Chris Smith, by telephone at 817-200-1095 or by e-mail at Chris.Smith@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511

G. Powell 2 requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/ Thomas R. Farnholtz, Chief Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-498 and 50-499

License Nos. NPF-76 and NPF-80

Enclosure:

Evaluations of Changes, Tests, and Experiments Inspection Request for Information

cc: Electronic Distribution for STP

G. Powell 3 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS INSPECTION

(05000498/2017007 AND 05000499/2017007) AND REQUEST FOR INFORMATION - April 13, 2017 DISTRIBUTION: KKennedy, RA

SMorris, DRA

TPruett, DRP AVegel, DRS JClark, DRS

RLantz, DRP

JBowen, RIV/OEDO

KFuller, RC VDricks, ORA JWeil, OCA

LRenger, NRR

AMoreno, RIV/CAO

BMaier, RSLO THipschman, IPAT EUribe, IPAT

MHerrera, DRMA

RIV ACES

NTaylor, DRP

DProulx, DRP JMelfi, DRP SJanicki, DRP

FSanchez, DRP

NHernandez, DRP

HWright, DRP

ADAMS ACCESSION NUMBER: ML17103A627 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: TFarnholtz Yes No Publicly Available Sensitive NRC-002 OFFICE RI:EB1 C:EB1 NAME CSmith TFarnholtz SIGNATURE /RA/ /RA/ DATE 4/12/17 4/13/17 OFFICIAL RECORD COPY

Enclosure Request for Information Evaluations of Changes, Tests, and Experiments Inspection South Texas Project Electric Generating Station, Units 1 and 2

Inspection Report: 05000498/2017007; 05000499/2017007

Inspection Dates: May 22-26, 2017

Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments"

Lead Inspector: Chris Smith, Reactor Inspector

Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic

format (preferred) by May 15, 2017, to the attention of Chris Smith. We request that you

categorize the documents in your response with the numbered list below. If only hard copies of the requested documents are available or if the electronic format is too large, please inform the lead inspector and provide the documents on the first day of the on-site inspection. Also, the

inspectors will select specific items from the information requested below and request from your staff additional documents needed during the on-site inspection weeks. We ask that the specific

items requested be available and ready for review on the first day of inspection. If you have any questions regarding this information request, please contact the lead inspector as soon as possible. 1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations. 2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully implemented changes, tests, and experiments performed since the last triennial modification inspection that did not result in an evaluation. 3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes, tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that

did not result in an application for a license amendment. 4. A list with descriptions of all temporary plant modifications implemented since the last triennial 10 CFR 50.59 inspection.

5. A list with descriptions of all compensatory actions for degraded or non-conforming conditions implemented since the last triennial 10 CFR 50.59 inspection. 6. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial 10 CFR 50.59 inspection. 7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates. 8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.

2 9. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report. 10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 programs. 11. A copy of the most recent submittal of the report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each, required by 10 CFR 50.59(d)(2). 12. A list of systems and system designators and a set of one-line (i.e., simplified) system diagrams. Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Inspector Contact Information:

Chris Smith Reactor Inspector

817-200-1095

Chris.Smith@nrc.gov

Wes Cullum Reactor Inspector

817-200-1563

Wes.Cullum@nrc.gov

Nnaerika Okonkwo Reactor Inspector

817-200-1114

Nnaerika.Okonkwo@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Chris Smith

1600 East Lamar Blvd. Arlington, TX 76011-4125