ML17352A478: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:ACCELERATED DISTBJBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS
{{#Wiki_filter:ACCELERATED DISTBJBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS
              ~-
~-
ACCESSION NBR:9403160284               DOC.DATE: 94/02/23     NOTARIZED: NO         DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light                 C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light                 C 05000251 AUTH. NAME           AUTHOR AFFXLIATION PLUNKETT,T.F.         Florida     Power & Light Co.
ACCESSION NBR:9403160284 DOC.DATE: 94/02/23 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFXLIATION PLUNKETT,T.F.
RECIP.NAME           RECIPIENT AFFXLXATION                                                 R Document Control Branch (Document         Control Desk)
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFXLXATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Confirms util support         of info gathering visit & chanqe of visit pl'an.
Confirms util support of info gathering visit & chanqe of visit dates to 940316
dates to 940316       & 17,in support of fatigue action                 D DISTRIBUTXON CODE: A001D           COPIES RECEIVED:LTR         ENCL       IZE TITLE: OR Submittal: General Distribution NOTES:
& 17,in support of fatigue action pl'an.
RECIPIENT             COPXES            RECIPIENT          COPIES ID   CODE/NAME           LTTR ENCL        ID  CODE/NAME      LTTR ENCL          D PD2-2 LA                     1          PD2-2 PD CROTEAU,R                                                                           D INTERNAL: NRR/DE/EELB                               NRR/DORS/OTS B NRR/DRCH/HXCB                            NRR/DRPW NRR/DSSA/SPLB                            NRR/DSSA/SRXB NUDOCS-ABSTRACT                          0       B OGC/HDS3                                  RE~IL           01 EXTERNAL: NRC PDR                                    NSIC D
DISTRIBUTXON CODE:
A001D COPIES RECEIVED:LTR ENCL IZE TITLE: OR Submittal: General Distribution NOTES:
DOCKET g 05000250 05000251 R
D RECIPIENT ID CODE/NAME PD2-2 LA CROTEAU,R INTERNAL: NRR/DE/EELB NRR/DRCH/HXCB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS3 EXTERNAL: NRC PDR COPXES LTTR ENCL 1
RECIPIENT ID CODE/NAME PD2-2 PD NRR/DORS/OTS B NRR/DRPW NRR/DSSA/SRXB 0
B RE~IL 01 NSIC COPIES LTTR ENCL D
D D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
D D
TOTAL NUMBER OF COPIES REQUIRED: LTTR               16   ENCL   ~4
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL ~4


V ~ V P
V
~
V P
V )
V )


PAL                                                         FE8 8 81995 L-94-46 U. S. Nuclear Regulatory Commission Attn:     Document       Control Desk Washington, D. C.           20555 Gentlemen:
PAL FE8 8 81995 L-94-46 U.
Re:     Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Information Gathering Visit in Su     ort of the Fati     ue Action Plan NRC   letter     from L. Raghavan to J.     H. Goldberg, dated February 14, 1994, informed           Florida Power and Light Co. (FPL) of NRC's intentions to   visit     FPL on March 15 and 16, 1994, to gather information relating to Turkey Point Units 3 and 4 fatigue design of reactor coolant pressure boundary components.             Based on our conversations with NRC Staff members, this letter confirms FPL's support of this information gathering       visit   and the change of the   visit dates to March 16, and 17, 1994.
S. Nuclear Regulatory Commission Attn:
Should there be any questions,           please contact us.
Document Control Desk Washington, D.
Very   truly     yours, T ~ F. Plunkett Vice President Turkey Point Plant cc:     Stewart D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson,       Senior Resident Inspector, USNRC, Turkey Point Plant Bt Og                                       ,ol 0284                                                              l 0 PbR                egg
C.
. p       <oace 0~~o>a~
20555 Gentlemen:
Ogopp~+
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Information Gathering Visit in Su ort of the Fati ue Action Plan NRC letter from L. Raghavan to J.
H. Goldberg, dated February 14,
: 1994, informed Florida Power and Light Co.
(FPL) of NRC's intentions to visit FPL on March 15 and 16, 1994, to gather information relating to Turkey Point Units 3 and 4 fatigue design of reactor coolant pressure boundary components.
Based on our conversations with NRC Staff members, this letter confirms FPL's support of this information gathering visit and the change of the visit dates to March 16, and 17, 1994.
Should there be any questions, please contact us.
Very truly yours, T ~ F. Plunkett Vice President Turkey Point Plant cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC T. P.
: Johnson, Senior Resident Inspector,
: USNRC, Turkey Point Plant Bt Og
. p
<oace 0~~o>a~
PbR 0284 egg Ogopp~+
F'DR an FPL Group company
F'DR an FPL Group company
,ol l 0


J~ ~}}
J~ ~}}

Latest revision as of 09:00, 7 January 2025

Confirms Util Support of Info Gathering Visit & Change of Visit Dates to 940316 & 17,in Support of Fatigue Action Plan
ML17352A478
Person / Time
Site: Turkey Point  
Issue date: 02/23/1994
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-46, NUDOCS 9403160284
Download: ML17352A478 (4)


Text

ACCELERATED DISTBJBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS

~-

ACCESSION NBR:9403160284 DOC.DATE: 94/02/23 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFXLIATION PLUNKETT,T.F.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFXLXATION Document Control Branch (Document Control Desk)

SUBJECT:

Confirms util support of info gathering visit & chanqe of visit dates to 940316

& 17,in support of fatigue action pl'an.

DISTRIBUTXON CODE:

A001D COPIES RECEIVED:LTR ENCL IZE TITLE: OR Submittal: General Distribution NOTES:

DOCKET g 05000250 05000251 R

D RECIPIENT ID CODE/NAME PD2-2 LA CROTEAU,R INTERNAL: NRR/DE/EELB NRR/DRCH/HXCB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS3 EXTERNAL: NRC PDR COPXES LTTR ENCL 1

RECIPIENT ID CODE/NAME PD2-2 PD NRR/DORS/OTS B NRR/DRPW NRR/DSSA/SRXB 0

B RE~IL 01 NSIC COPIES LTTR ENCL D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 16 ENCL ~4

V

~

V P

V )

PAL FE8 8 81995 L-94-46 U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Information Gathering Visit in Su ort of the Fati ue Action Plan NRC letter from L. Raghavan to J.

H. Goldberg, dated February 14,

1994, informed Florida Power and Light Co.

(FPL) of NRC's intentions to visit FPL on March 15 and 16, 1994, to gather information relating to Turkey Point Units 3 and 4 fatigue design of reactor coolant pressure boundary components.

Based on our conversations with NRC Staff members, this letter confirms FPL's support of this information gathering visit and the change of the visit dates to March 16, and 17, 1994.

Should there be any questions, please contact us.

Very truly yours, T ~ F. Plunkett Vice President Turkey Point Plant cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC T. P.

Johnson, Senior Resident Inspector,
USNRC, Turkey Point Plant Bt Og

. p

<oace 0~~o>a~

PbR 0284 egg Ogopp~+

F'DR an FPL Group company

,ol l 0

J~ ~