{{#Wiki_filter:PRINCIPAL STAF RA        LiRP D/RA      ---
{{#Wiki_filter:consumers Power company General Offices: 1945 West Parnell Raad, Jackson, Ml 49201 '{517J 768-0550 October 26, 1984 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PRINCIPAL STAF RA Li RP D/RA C
consumers                                             C PAO Power                                                 SGA company                                               EIC DRMA General Offices:     1945 West Parnell Raad, Jackson, Ml 49201 '{517J 768-0550 October 26, 1984 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - PHYSICS TESTING REPORT FOR PALISADES CYCLE 6 START-UP The attached report .(Physics'Testing Report for Cycle 6 Start-Up) is being submitted as required by Palisades Technical Specification 6.9.1.a.
PAO SGA EIC DRMA PALISADES PLANT - PHYSICS TESTING REPORT FOR PALISADES CYCLE 6 START-UP The attached report.(Physics'Testing Report for Cycle 6 Start-Up) is being submitted as required by Palisades Technical Specification 6.9.1.a.
The results of the conducted tests show all acceptance criteria were met and are in conformance with our letter entitled "Physics Test Program" and dated October 31, 1979 except symmetric rod worth. We have determined that the symmet;ric rod worth test revealed a small core tilt not significant enough to be of concern at power and not indicative of a core loading error. Please note that a supplemental report will be submitted for power distribution after reaching full power at Palisades.
The results of the conducted tests show all acceptance criteria were met and are in conformance with our letter entitled "Physics Test Program" and dated October 31, 1979 except symmetric rod worth.
Brian D Johnson Staff Licensing Engineer CC     Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades Attachment
We have determined that the symmet;ric rod worth test revealed a small core tilt not significant enough to be of concern at power and not indicative of a core loading error.
    . ' '              6''0384 8'41026.
Please note that a supplemental report will be submitted for power distribution after reaching full power at Palisades.
    *., '.:841_10 OCK~ 05000255
Brian D Johnson Staff Licensing Engineer CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades Attachment 6''0384 8'41026.  
  *. P'O~       ... AD.
*., '.:841_10 OCK~ 05000255 P'O~... AD.  
P* .. '*'.          * **" )< P*DR
* **" )< P*DR P*.. '*'.
                                          ,_ ..__                              NOV        11984
OC1084-0011-NL02 NOV 11984}}
            . ***-*
OC1084-0011-NL02}}

Latest revision as of 09:51, 6 January 2025

Forwards Physics Testing Rept for Cycle 6 Startup. Test Results Show All Acceptance Criteria Met & in Conformance w/791031 Ltr Entitled, Physics Test Program, Except for Symmetric Rod Worth
ML18051B101
Person / Time
Site: Palisades 
Issue date: 10/26/1984
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML18051B102 List:
References
NUDOCS 8411060384
Download: ML18051B101 (1)


Text

consumers Power company General Offices: 1945 West Parnell Raad, Jackson, Ml 49201 '{517J 768-0550 October 26, 1984 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PRINCIPAL STAF RA Li RP D/RA C

PAO SGA EIC DRMA PALISADES PLANT - PHYSICS TESTING REPORT FOR PALISADES CYCLE 6 START-UP The attached report.(Physics'Testing Report for Cycle 6 Start-Up) is being submitted as required by Palisades Technical Specification 6.9.1.a.

The results of the conducted tests show all acceptance criteria were met and are in conformance with our letter entitled "Physics Test Program" and dated October 31, 1979 except symmetric rod worth.

We have determined that the symmet;ric rod worth test revealed a small core tilt not significant enough to be of concern at power and not indicative of a core loading error.

Please note that a supplemental report will be submitted for power distribution after reaching full power at Palisades.

Brian D Johnson Staff Licensing Engineer CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades Attachment 60384 8'41026.

  • ., '.:841_10 OCK~ 05000255 P'O~... AD.
  • **" )< P*DR P*.. '*'.