ML18057A827: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 1
| page count = 1
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:--
{{#Wiki_filter:--
consumers Power                                                 GB Slade General MQJIQger POWERiNii MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043
consumers Power POW ERi Nii MICHlliAN'S PROliRESS Palisades Nuclear Plant:
27780 Blue Star Memorial Highway, Covert, Ml 49043
* March 25, 1991 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
* March 25, 1991 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
TECHNICAL SPECIFICATIONS CHANGE REQUEST - LOCAL LEAK RATE TESTING - PERSONNEL AND EMERGENC~.ESCAPE AIRLOCKS
GB Slade General MQJIQger TECHNICAL SPECIFICATIONS CHANGE REQUEST - LOCAL LEAK RATE TESTING - PERSONNEL AND EMERGENC~.ESCAPE AIRLOCKS  
    *Enclosed is a request for change to the Palisades Technical Specifications to
*Enclosed is a request for change to the Palisades Technical Specifications to
* incorporate clarification on the performance of airlock testing and to add acceptance criteria for an ~dded test.
* incorporate clarification on the performance of airlock testing and to add acceptance criteria for an ~dded test. to this submittal contains th~* proposed Technical Specification pages and Enclosure 2 has existing Technical Specification pages marked up to show the proposed changes.
Enclosure 1 to this submittal contains th~* proposed Technical Specification pages and Enclosure 2 has existing Technical Specification pages marked up to show the proposed changes. It is requested that this change be made effective within 30 days after issuance .
It is requested that this change be made effective within 30 days after issuance.  
      .~ml~JCl;qhwaIL.-
. m J Cl;qhwaIL.-
1 8 Slade     ..An__
~
General Manager .
l~
CC:     Administrator, Region III, NRC NRC Resident Inspector}}
1 8 Slade..An__
General Manager.
CC:
Administrator, Region III, NRC NRC Resident Inspector}}

Latest revision as of 08:52, 6 January 2025

Forwards Application for Amend to License DPR-20
ML18057A827
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/25/1991
From: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18057A828 List:
References
NUDOCS 9104010390
Download: ML18057A827 (1)


Text

--

consumers Power POW ERi Nii MICHlliAN'S PROliRESS Palisades Nuclear Plant:

27780 Blue Star Memorial Highway, Covert, Ml 49043

  • March 25, 1991 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

GB Slade General MQJIQger TECHNICAL SPECIFICATIONS CHANGE REQUEST - LOCAL LEAK RATE TESTING - PERSONNEL AND EMERGENC~.ESCAPE AIRLOCKS

  • Enclosed is a request for change to the Palisades Technical Specifications to
  • incorporate clarification on the performance of airlock testing and to add acceptance criteria for an ~dded test. to this submittal contains th~* proposed Technical Specification pages and Enclosure 2 has existing Technical Specification pages marked up to show the proposed changes.

It is requested that this change be made effective within 30 days after issuance.

. m J Cl;qhwaIL.-

~

l~

1 8 Slade..An__

General Manager.

CC:

Administrator, Region III, NRC NRC Resident Inspector