ML18082A959: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML18082A959 | | number = ML18082A959 | ||
| issue date = 08/21/1980 | | issue date = 08/21/1980 | ||
| title = Forwards Original of Revised | | title = Forwards Original of Revised Re Licensed Operator Staffing Plan for Facility.Initial Revision Transmitted by Telex on 800821.Revised Ltr Includes Page 5 Portion Omitted by Typing Error | ||
| author name = | | author name = Librizzi F | ||
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY | | author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY | ||
| addressee name = | | addressee name = Eisenhut D | ||
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | | addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | ||
| docket = 05000272, 05000311 | | docket = 05000272, 05000311 | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8008260380 | | document report number = NUDOCS 8008260380 | ||
| title reference date = 08-20-1980 | |||
| package number = ML18082A960 | | package number = ML18082A960 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 18: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:". | {{#Wiki_filter:". | ||
Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 201 /430-7000 Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Conunission Washington, D.C. | |||
20555 | |||
==Dear Sir:== | ==Dear Sir:== | ||
August 21, 1980 REVISION TO LICENSED OPERATOR STAFFING PLAN SALEM GENERATING STATION Due to an oversite in the preparation of the typing of our letter "Licensed Operator Staffing Plan, Salem Generating Station" dated August 20, 1980 and delivered to you by messenger at 9:00 A.M. on August 21, 1980, part of the page 5 was omitted in the letter you received. | August 21, 1980 REVISION TO LICENSED OPERATOR STAFFING PLAN SALEM GENERATING STATION Due to an oversite in the preparation of the typing of our letter "Licensed Operator Staffing Plan, Salem Generating Station" dated August 20, 1980 and delivered to you by messenger at 9:00 A.M. on August 21, 1980, part of the page 5 was omitted in the letter you received. | ||
This oversite was corrected and a revised letter was sent you you by Telex before noon on August 21, 1980. Attached is the original of the revised letter. Please apply the attachments of the letter you received to this letter and destroy the incorrect version. CC S. Hanauer J. Kerrigan . 1879 1979 Sincerely yours, Frank P. Librizzi General Manager -Electric Production 95-2001 (300M) 1-79}} | This oversite was corrected and a revised letter was sent you you by Telex before noon on August 21, 1980. | ||
Attached is the original of the revised letter. | |||
Please apply the attachments of the letter you received to this letter and destroy the incorrect version. | |||
CC S. Hanauer J. Kerrigan | |||
. 1879 1979 Sincerely yours, Frank P. Librizzi General Manager - | |||
Electric Production 95-2001 (300M) 1-79}} | |||
Latest revision as of 05:33, 6 January 2025
| ML18082A959 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/21/1980 |
| From: | Librizzi F Public Service Enterprise Group |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18082A960 | List: |
| References | |
| NUDOCS 8008260380 | |
| Download: ML18082A959 (1) | |
Text
".
Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 201 /430-7000 Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Conunission Washington, D.C.
20555
Dear Sir:
August 21, 1980 REVISION TO LICENSED OPERATOR STAFFING PLAN SALEM GENERATING STATION Due to an oversite in the preparation of the typing of our letter "Licensed Operator Staffing Plan, Salem Generating Station" dated August 20, 1980 and delivered to you by messenger at 9:00 A.M. on August 21, 1980, part of the page 5 was omitted in the letter you received.
This oversite was corrected and a revised letter was sent you you by Telex before noon on August 21, 1980.
Attached is the original of the revised letter.
Please apply the attachments of the letter you received to this letter and destroy the incorrect version.
CC S. Hanauer J. Kerrigan
. 1879 1979 Sincerely yours, Frank P. Librizzi General Manager -
Electric Production 95-2001 (300M) 1-79