ML18093A869: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:* Public Service Electric and Gas Company Steven E. Miltenberger Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-33_9-4199 Vice President and Chief Nuclear Officer May 27, 1988 NLR-N88078 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen: | {{#Wiki_filter:* | ||
RESPONSE TO GENERIC LETTER 88-03 SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Public Service Electric and Gas Company (PSE&G} has received the subject NRC Generic Letter regarding steam binding of Auxiliary Feedwater (AFW} Pumps. The information requested by the Generic Letter as related to Salem Generating Station is provided in the enclosure to this letter. Should you have any questions with regard to this transmittal, please do not hesitate to contact us. Sincerely, Attachment | Public Service Electric and Gas Company Steven E. Miltenberger Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-33_9-4199 Vice President and Chief Nuclear Officer May 27, 1988 NLR-N88078 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen: | ||
RESPONSE TO GENERIC LETTER 88-03 SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Public Service Electric and Gas Company (PSE&G} has received the subject NRC Generic Letter regarding steam binding of Auxiliary Feedwater (AFW} Pumps. | |||
r----s8060962i1 | The information requested by the Generic Letter as related to Salem Generating Station is provided in the enclosure to this letter. | ||
:::so527 | Should you have any questions with regard to this transmittal, please do not hesitate to contact us. | ||
Sincerely, Attachment r----s8060962i1 :::so527 PDR ADOCI< 0500027:2 p | |||
DCD | |||
;J.1fL> day of Jl/°!j , 1988 b JYl OcJ.4 ) E1LEEMM. OCHS No;tary. PutHic of New JerseltOTARY PUBLIC OF NEW JERSEY . c.:,-_, | |||
ATTACHMENT NRC Generic Letter 88-03 requests PSE&G to confirm that Salem Generating Station will: 1. Maintain procedures to monitor fluid conditions within the AFW system each shift during times when the system is required to be operable. | Document Control Desk 2 | ||
This monitoring should ensure that fluid temperature at the AFW pump discharge is maintained at about ambient levels. 2. Maintain procedures for recogn1z1ng steam binding and for restoring the AFW system to operable status, should steam binding occur. RESPONSE | C Mr. D. C. Fischer USNRC Licensing Project Manager Mr. R. w. Borchardt USNRC Senior Resident Inspector Mr. w. T. Russell, Administrator USNRC Region I Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628 05-27-88 | ||
STATE OF NEW JERSEY SS. | |||
COUNTY OF SALEM Steven E. Miltenberger, being duly sworn according to law deposes and says: | |||
I am Vice President and Chief Nuclear Officer of Public Service Electric and Gas Company, and as such, I find the matters set forth in our {{letter dated|date=May 27, 1988|text=letter dated May 27, 1988}} | |||
, concerning Facility Operating Licenses DPR-70 and DPR-75 for Salem Generating Station, are true to the best of my knowledge, information and belief. | |||
Subscribed and Sworn to before me | |||
~~.i~' ;J.1fL> day of Jl/°!j | |||
, 1988 b ~ | |||
JYl OcJ.4 ) | |||
E1LEEMM. OCHS No;tary. PutHic of New JerseltOTARY PUBLIC OF NEW JERSEY | |||
. c.:,-_, | |||
MJ Commlas~a ~plres JulJ 16, 1992 My,Cornrni13s.ion expires on | |||
/" | |||
ATTACHMENT NRC Generic Letter 88-03 requests PSE&G to confirm that Salem Generating Station will: | |||
: 1. | |||
Maintain procedures to monitor fluid conditions within the AFW system each shift during times when the system is required to be operable. | |||
This monitoring should ensure that fluid temperature at the AFW pump discharge is maintained at about ambient levels. | |||
: 2. | |||
Maintain procedures for recogn1z1ng steam binding and for restoring the AFW system to operable status, should steam binding occur. | |||
===RESPONSE=== | |||
Salem Unit Nos. 1 and 2 have in place Periodic Inspection Procedure (PI/S-AF-3) "Auxiliary Feedwater Backleakage" which identifies conditions that could lead to steam binding by monitoring the AFW pump discharge piping temperature. | Salem Unit Nos. 1 and 2 have in place Periodic Inspection Procedure (PI/S-AF-3) "Auxiliary Feedwater Backleakage" which identifies conditions that could lead to steam binding by monitoring the AFW pump discharge piping temperature. | ||
This procedure is performed once per shift in Modes 1, 2 and 3, to prevent steam binding conditions from occurring. | This procedure is performed once per shift in Modes 1, 2 and 3, to prevent steam binding conditions from occurring. | ||
The procedure requires Engineering notification if the discharge piping reaches 120°F or the temperature difference (Delta T) between any two discharge lines is greater than 10°F. Should the discharge piping temperature reach 160°F, specific guidance is provided to restore the AFW system to an operable status.}} | The procedure requires Engineering notification if the discharge piping reaches 120°F or the temperature difference (Delta T) between any two discharge lines is greater than 10°F. | ||
Should the discharge piping temperature reach 160°F, specific guidance is provided to restore the AFW system to an operable status.}} | |||
Latest revision as of 03:59, 6 January 2025
| ML18093A869 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 05/27/1988 |
| From: | Miltenberger S Public Service Enterprise Group |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| GL-88-03, GL-88-3, NLR-N88078, NUDOCS 8806090221 | |
| Download: ML18093A869 (4) | |
Text
Public Service Electric and Gas Company Steven E. Miltenberger Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-33_9-4199 Vice President and Chief Nuclear Officer May 27, 1988 NLR-N88078 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
RESPONSE TO GENERIC LETTER 88-03 SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Public Service Electric and Gas Company (PSE&G} has received the subject NRC Generic Letter regarding steam binding of Auxiliary Feedwater (AFW} Pumps.
The information requested by the Generic Letter as related to Salem Generating Station is provided in the enclosure to this letter.
Should you have any questions with regard to this transmittal, please do not hesitate to contact us.
Sincerely, Attachment r----s8060962i1 :::so527 PDR ADOCI< 0500027:2 p
Document Control Desk 2
C Mr. D. C. Fischer USNRC Licensing Project Manager Mr. R. w. Borchardt USNRC Senior Resident Inspector Mr. w. T. Russell, Administrator USNRC Region I Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628 05-27-88
STATE OF NEW JERSEY SS.
COUNTY OF SALEM Steven E. Miltenberger, being duly sworn according to law deposes and says:
I am Vice President and Chief Nuclear Officer of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter dated May 27, 1988
, concerning Facility Operating Licenses DPR-70 and DPR-75 for Salem Generating Station, are true to the best of my knowledge, information and belief.
Subscribed and Sworn to before me
~~.i~' ;J.1fL> day of Jl/°!j
, 1988 b ~
JYl OcJ.4 )
E1LEEMM. OCHS No;tary. PutHic of New JerseltOTARY PUBLIC OF NEW JERSEY
. c.:,-_,
MJ Commlas~a ~plres JulJ 16, 1992 My,Cornrni13s.ion expires on
/"
ATTACHMENT NRC Generic Letter 88-03 requests PSE&G to confirm that Salem Generating Station will:
- 1.
Maintain procedures to monitor fluid conditions within the AFW system each shift during times when the system is required to be operable.
This monitoring should ensure that fluid temperature at the AFW pump discharge is maintained at about ambient levels.
- 2.
Maintain procedures for recogn1z1ng steam binding and for restoring the AFW system to operable status, should steam binding occur.
RESPONSE
Salem Unit Nos. 1 and 2 have in place Periodic Inspection Procedure (PI/S-AF-3) "Auxiliary Feedwater Backleakage" which identifies conditions that could lead to steam binding by monitoring the AFW pump discharge piping temperature.
This procedure is performed once per shift in Modes 1, 2 and 3, to prevent steam binding conditions from occurring.
The procedure requires Engineering notification if the discharge piping reaches 120°F or the temperature difference (Delta T) between any two discharge lines is greater than 10°F.
Should the discharge piping temperature reach 160°F, specific guidance is provided to restore the AFW system to an operable status.