ML18094B224: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:NRC FORM 474                                                                                                                                                              U.S. NUCLEAR REGULATORY COMMISSION 110-861                                                                                                                                                                                                        Al!Provod by OMB 10 CFR § 55.45(bl,                                                                                                                                                                                              3150-0138 55.4 and 55.5                                              SIMULATION FACILITY CERTIFICATION                                                                                                                    Expireo 10-31-89 INSTRUCTIONS. This form is to be filed for initial certification, recertification (if required), and for any change to a simulation facility performance testing plan made after initial submittal of such a plan. Provide the following information, and check the appropriate box to indicate reason for submittal.
{{#Wiki_filter:}}
FACILITY                                                                                                                                                                                  IDOCKET NUMBER Salem Generating Station Unit 1                                                                                                                                                        50-    272 LICENSEE                                                                                                                                                                                  'DATE DPR-70                                                                                                                                                                                        12/28/89 This is to cenify thai: 1. the above named facility licensee is using a simulation facility consisting sol~y of a plant-referenced limulator that meets the requirements of 10 CFR' 55.46; 2. this simulation facility meets the guidance contained in ANSI/ ANS 3.5, 1985, .as endorsed by NRC Regulatory Guide 1.149; and 3. documentotion 11 av11Uable for NRC review in accordance with 10 CFR 1 56.461bl. If there ere any exceptions to the c"ertification of item 2 above, check here  D    and describe fully on eddrtional pages as necessary.
NAME (or_otheridentification) AND LOCATION OF SIMULATION FACILITY Salem Simulator, Salem, New Jersey XI    SIMULATION FACILITY PERFORMANCE TEST ABSTRACTS A TT ACHED. (For performance                                          t~s conducted in th11 {J<<"iod ending with the dat11 of this certification)
DESCRIPTION OF PER FOR MANCE TESTING COMPLETED (Attach additional page(s) as necessary, an~ identify the item description being continued)
See Attachment 3 SP-206, "Hope Creek/Salem Simulator Procedure", specifically Appendix 9, Appendix 10' Appendix ll, and Appendix 12 XI  SIMULATION FACILITY PERFORMANCE TESTING SCHEDULE ATTACHED. (For the conduct of approximately 25'1(, of performance tests per year for the four year period commencing with the date of this certification.)
DESCRIPTION OF PERFORMANCE TESTING TO BE CONDUCTED (Attach additional page(s) as necessary, and identify the item description being continued)
See Attachment 3 SP-206, "Hope Creek/Salem Simulator Procedure", specifically Appendix 12 IPERFORMANCE TESTING PLAN CHANGE. (For any modification to a performance testing plan submitttld on a previous certification)
DESCRIPTION OF PERFORMANCE TESTING PLAN CHANGE (Attach additional page(s) as necessary, and identify the item description being continued}
N/A        -  Initial Submittal
                                                                                                                                                                                                                              -
                                  .~'
I R ECERTI F !CATION (Describe corrective actions taken, attach results of completed performance testing in accordance with 10 CFR Attach additional oaoelsl as necessarv. and identify the item descriotion beino continued.)
                                                                                                                                                                    &sect; 55.45(b)(5)(v).
N/A        -  Initial Submittal
                            ..
                          *~ '.
                              '
Any false statement or omission in this document. including attachments, may be subject to civil and criminal sanctions. I certify under penalty of perjury that the information in this document and attachments 1s true and correct.
Sl4~E~RESENTATIVE                                                                                      'TITLE                                                                                  IDATE Vice President                      -    Nuclear Operations                                  12/28/89 rn accordance with 10 CFR ~ 55.5, Communications, this form shall be submitted to the NRC as follows:
BY MAIL ADDRESSED TO: Director, Office of Nuclear Reactor Regulation                                              BY DELIVERY IN PERSON 1
* U.S. Nuclear Regulatory Commission                                    TO THE NRC OFFICE AT:                    7920 Norfolk Avenue Washington, DC 20555                                                                                            Bethesda, MD
'.;-on p I -, 1**o:=:nq\
                  - * ;~
* 1 n
                                ..,, ~* :~:*~!22:3                ------..
p rR          ADJ1Jt'!+* O!:t<J00272 PDC
 
NRC FORM 474                                                                                                                                                                U.S. NUCLEAR REGULATORY COMMISSION 110*861                                                                                                                                                                                                            A!!P'"""'! by OMB 10 CFR &sect; 55.45(bl.                                                                                                                                                                                                  31~138 55.4 and 55.5                                                  SIMULATION FACILITY CERTIFICATION                                                                                                                      ExpiNo 10.3Hl9 INSTRUCTIONS. This form is to be filed for initial certification, recertification (if required), and for any change to a simulation facility performance testing plan made after initial submittal of such a plan. Provide the following information, and check the appropriate box to indicate reason for submittal.
FACILITY                                                                                                                                                                                      IDOCKET NUMBER Salem Generating Station Unit 2                                                                                                                                                          50-    3ll LICENSEE                                                                                                                                                                                      IDATE DPR-75                                                                                                                                                                                            12/28/89 This is to certify that: 1. the above named facility licensee is using a simulation facility consisting solely of a plant-referenced limulator that meeta the requirementa of 10 CFR
* 56.45; 2. this simulation facility meets the guidance contained in ANSI/ ANS 3.5. 1985. as endorsed by NRC Regulatory Guide 1.149; and 3. documanWion lo avoil- for NRC raview in accordance with 10 CFR
* 56.46(bl. If there are any exceptions to the certification of item 2 above, check here    0  and describe fully on additional pages as necess1ry.
NAME (ororher idenriticarion} AND LOCATION OF SIMULATION FACILITY Salem Simulator, Salem, New Jersey xi  SIMULATION FACILITY PERFORMANCE TEST ABSTRACTS ATTACHED. (For performance rtmsconducred in rh11periodending with the dare of rhiscertificarionl DESCRIPTION OF PERFORMANCE TESTING COMPLETED (Attach additional page(s} as necessary, an~ identify the irem dtJSCriprion being continued}
See Attachment 3 SP-206, "Hope Creek/Salem Simulator Procedure", specifically Appendix 9, Appendix 10, Appendix 11, and Appendix 12 XI commencinq SIMULATION FACILITY PERFORMANCE TESTING SCHEDULE ATTACHED. (Fortheconductofapproximarely 25% of performanc11 rests per year for rhe four yearp11riod wirh rhe dare of this cerrificarion.J DESCRIPTION OF PERFORMANCE TESTING TO BE CONDUCTED (Arrach additional page(s} as necessary, and identify rhe irem description being continued}
See Attachment 3 SP-206, "Hope Creek/Salem Simulator Procedure", specifically Appendix 12.
j PERFORMANCE TESTING PLAN CHANGE. (For any modification to a performance resring plan submitt~ on a previous certification}
DESCRIPTION OF PERFORMANCE TESTING PLAN CHANGE (Attach additional page(s} as necessary, and identify the irem description being continued}
                                                                                                                                      -
N/A        -    Initial Submittal IREc ER TI FICAT ION            (Describe corrective actions raken, arrach results of completed performance resting in accordance wirh 10 CF R &sect; 55.45(b/(51 lvl.
A rrach additional oaae(s} as necessarv, and identifv rhe irem descriorion beina continued.}
                                                                                                                                                                                                                                      -
N/A      -    Initial Submittal.
                                                                                    -
Any false statement or omission in this document, including attachments, may be subject to civil and criminal sanctions. I certify under penalty of perjury that the information in this document and attachments is true and correct.
SIG?.~~
                                                                                                        'TITLE                                                                                      'DATE Vice President                        -    Nuclear Operations                                12/28/89 Jf\"accordance with 10 CFR ~ 55.5, Communications, this form shall be submitted to the NRC as follows:
BY MAIL ADDRESSED TO: Director, Office of Nuclear Reactor Regulation                                              BY DELIVERY JN PERSON
* U.S. Nuclear Regulatory Commission                                      TO THE NRC OFFICE AT:                    7920 Norfolk .Avenue Washington, DC 20555                                                                                              Bethesda, MD
 
                                                                                                                                                                              ,.
t---------------------------------------------------------------------------------
HOPE CREEK & SALEM SIMULATOR CERTIFICATION FLOVCHART ACTUAL  NW. YTICH.. SIHILIM    BEST                                          CONFIGURATION MANAGEMENT Pl.NIT    DATA          PLANT    ESTIMATE SIGNlf"ICANT EVENTS PERFORMANCE FIDELITY ANNUAL REVIEV SIMULATOR DATA BASE                CPERATING                                            Vl1RfC PACKAGES LIMITATIONS UPGIWJE LOAD SitU.ATDR REAL-TIME                                                                    TARGET LOAD      PERF'DRHANCE TESTS TESTS REFERENCE                    STEADY-STATE                          TRANSIENT            OPERABILITY        4-YEAR Pl.ANT                        DPERATIDN                          DPERATil>>-il          TESTING          PLAN CDHPMistm BASELINE    DRin      tEAT IC-S        TEST    BH.NICE      HALFUNCTIDN        PERF'IRtANCE TESTING            TESTING PHYSICAL F'IDELITY llPERATING PROCEDURES                                                                                                                                    SI APERTURE CARD ....._,
Also Available On Aperture Card Sill.LATDR        VALIDATED INSTRUCTOR          DATABASE GUIDE
                                                                  ~-----------------!                  SIMULATOR vs STATION DIFFERENCES r-------------------___J TRAINING LOAD SCENERIO GUIDES 9W/Cflot /0-0 I
.
 
SP-206 HOPE CREEK/SALEM SIMULATOR PROCEDURE NO. 206
* ANS. 3-5 VALIDATION SUBMITTED:
orrnance Engineer REVIEWED:                                              11",fQe, n ip 1 Training Supervisor          ~
                      'rnulator Support
* APPROVED:
            ~4ions                        Training
* Date : o*s I o4 I Rev. : - -O- -
89
 
SP-206 TABLE OF CONTENTS
* HOPE CREEK/SALEM PROCEDURE NO. 206 "ANS. 3-5 VALIDATION" Page
: 1. 0    Purpose                                      1 2.0    References                                    1 3.0    Background                                    1 4.0    Simulator Informati9n                        1 4.1    General Information                          1 4 .1.1  Co-Owners                                    1 4 .1. 2 Operators                                    2 4 .1. 3 '.1anufacturer                                2 4 .1. 4 Reference Plant                              2 4 .1. 5 Type                                          2
* 4.1.6  Date Available for Training                  2 4 .1. 7 Type of Report                                2 4.2    Control Room                                  3 4.2.1  Physical Arrangement                          3 4.2.2  Control Panels Included in the Simulator      3
: 4. 2. 3 Panels/Equipment Not Included in the          3 Simulator 4.2.4  Plant Systems                                4
: 4. 2. 5 Simulated Control Room Environment            5 4.3    Instructor Interface                          5 4.3.1  Location and Operation of Instructor          5 Controls 4~3.2  Initial Conditions                            5
*
: 4. 3. 3 Malfunctions                                  5 4.3.4  Remote Functions                              5 Date: 08/04/89 i                      Rev.: ----'-0_ _
 
SP-206 TABLE OF CONTENTS Cont.
* HOPE CREEK/SALEM PROCEDURE NO. 206 "ANS. 3-5 VALIDATION" Page 4.4    Operating Procedures                        5 4.5    Changes Since Last Report                  6 5.0    Simulator Database                          6 5.1    Document Control                            6 5.2    Performance Criteria Objectives            6 5.3    Transient Operating Conditions Database    7 Development 6.0    Simulator Tests                            7 6.1    Computer Real Time Verification            7 6 .1.1  Time and Memory Calculations                8
* 6 .1. 2 6.2
: 6. 2 .1 Frame Slip Counter Normal Operations Mass and Energy Balance 8
8 8
6.2.2  Drift Verification                          8 6.2.3  Normal Plant Evolutions                    8 6.3    Abnormal/Transient Operations              8 6.4    Annual Operability and Malfunction Testing  9
: 6. 5    Simulator Operating Limitations            10 7.0    Simulator Modification                      11 7.1    Modification                                11 7.2    Performance Testing                        11 7.2.la  Full Scope Performance Test                11
., 7.2.lb 7.3 Partial Scope Performance Test Training Load Update 11 12 Date: 08/04/89 ii                    Rev.: - - -
 
SP-206 TABLE OF CONTENTS Cont.
* SIMULATOR PROCEDURE NO. 206 "ANS. 3-5 VALIDATION" Page 7.4 Simulator Instructor Guide                12 7.5 },nnual Review                            12
*
* iii Date: 08/04/89 Rev.: - -
 
SP-206 DEFINITIONS
    *The definitions in ANS. 3.5-1985 apply to this procedure. The following
* definitions are additional definitions to or clarifications of the definitions in ANS. 3.5-1985. All definitions are presented in this procedure and its appendices in boldface italics.
ALARM DEFINITION A visual warning device originating from either the Overhead Annunciators and/or Control Board Console accompanied by an audible signal.
ANTICIPATED          Expected outcome of a test (performance or RESPONSE            malfunction) to be performed. Anticipated events may be based on Plant Reference Data, Analytical Data, or Best Estimate (calculation or tabletop analysis). Best Estimate may include present simulator configuration and performance based on previous simulated module inputs.
CONSISTENT          Not contradictory and close to the value of the reference parameter. In general, this will. be interpreted as within 10% of the reference parameters.
DCR/DCP              Design Change Request and Design Change Package.
Reference Plant change documents:- a DCR, when
* approved, generates DCP(s) which implement the requested change.
HOT STANDBY          Salem:        Subcritical and RCS > 350&deg;F Hope Creek:  Mode Switch in Startup and average Reactor Coolant at any temperature INITIAL              A set of data that represents the status of CONDITIONS          reference plant from which real-time simulation can begin.
LIMITED USE          Malfunctions that have been tested and validated, MALFUNCTIONS        but which have a minor deficiency that will normally not detract from training. These malfunctions are identified in the Simulator Instructor Guide
{Appendix 17), along with a description of the deficiency.
MODIFICATIONS        Any change to the simulator that requires a change to the simulator hardware and/or softwqre.
OPERABILITY TESTS    Simulator performance tests required on an annual (OPERABILITY        basis to:
TESTING)            Verify overall simulator model completeness and integration
* Verify simulator Steady-State performance Verify simulator transient performance Date: 08/04/89 iv                      Rev . : -----'o___
L
 
SP-206 TERM                  DEFINITION MALFUNCTION        Malfunction Test Procedures are test procedures used
* TEST*
PROCEDURE NON-RECOVERABLE/
RECOVERABLE to test and validate all simulator malfunctions and other plant transients not listed via Performance Test Procedures.
For the purpose of prioritizing differences between the simulator and the reference plant hardware con-OPERATOR ERRORS    figuration or response, operator errors that may result from these differences are classified as "non-recoverable" or "recoverable" operator errors.
In this context,
                          - Non-recoverable operator errors are errors that, once* committed;
: 1)  result in a change in the steady-state operating conditions; or
: 2)  limit or prevent the ability of the operator(s) to control and/or recover the plant to a stable, safe condition in accordance with plant operating procedures.
                          - Recoverable operator errors are errors, once cbmmitted do not result in either of the conditions listed above.
* PERFORMANCE        Performance Test Procedures are test procedures used
  *TEST                to test and validate those malfunctions and PROCEDURE          transie~ts that are required by Section 3.1.2 and Appendix B of ANS-3.5-1985.    (Note: only one representative plant malfunction is tested by a Performance Test Procedures for each Section 3.1.2 requirement).
REMOTE FUNCTIONS    An instructor interface allowing simulation of auxiliary operator actions remote from the control room.
SIMULATOR OPERATING Limi tation.s based on design values of selected LIMITATIONS        parameters. Simulation outside these limitations may be beyond known reference plant behavior or the capability of the simulation models.
TRANSIENT          A transient begins when steady-state critical parameters change from steady-~tate values. Th~se conditions may result from the introduction of malfunction(s), remote function(s), operator action(s), or a combination of the three. A specific instrument failure that causes a single critical parameter to change without affecting other critical parameters is not considered a transient .
* v Date: 08/04/89 Rev.:    0
* SP-206 TERM            DEFINITION TYPE OF REPORT The report submitted for initial simulator
* certification is the Initial Report. An Update Report will be submitted as outlined in section 8.0 Simulator Update Reporting .
*
* vi Date: 08/04/89 Rev . : ------'o___
 
SP-206 LIST OF APPENDICES
* Appendix 1 Appendix 2 Appendix 3 Appendix 4 Station vs Simulator Hardware Differences Database Location and Operation of Instructor Controls Initial Condition Validation Malfunctions Appendix 5  Remote Functions Appendix 6  Station Procedure Performance Database Appendix 7  Simulator Design Database Appendix 8  Computer Real Time Verification Appendix 9  Mass and Energy Balance & Drift Verification Appendix 10  Normal Plant Evolutions Appendix 11  Performance and Malfunction Tests Appendix 12  Annual Operability and Malfunction Testing Appendix 13  Significant Plant Operating Events
* Appendix* 14 Appendix 15 Appendix 16 Operator Feedback Full Scope Performance Testing Partial Scope Performance Testing Appendix 17  Simulator Instructor Guide Appendix 18  Reference Data Appendix 19  Changes Since Last Report
* vii Date: 08/04/89 Rev. : _ _o___
 
SP-206 HOPE CREEK/SALEM SIMULATOR PROCEDURE
* NO. 206 ANS. 3-5 VALIDATION 1.0  PURPOSE The purpose of simulator certification is to ensure that the simulator processes a sufficient degree of accuracy and completeness to train safe and efficient operators.
 
==2.0  REFERENCES==
 
2.1  ANSI/ANS~J.5-1985:  Nuclear Power Plant Simulators for Use in Operator Training.
2.2  Regulatory Guide 1.149: Nuclear Power Plant Simulation Facilities For Use In Operator License Examinations.
 
===2.3 NUREG-1258===
Evaluation Procedure for Simulation Facilities Certified under 10CFR55.
 
===2.4 10CRF55===
Operator's Licenses
 
==3.0  BACKGROUND==
 
Paragraph 55.45(b) 10CFR55 requires that candidates for operator or
* senior operator licenses be examined, in part, on a certified simulator. Regulatory Guide 1.149 endorses ANS-3.5-1985 as a means by which a simulator may be certified. NUREG-1258 describes the process by which the NRC will evaluate simulator certification.
Based on these documents, this procedure and its supporting appendices will specify the process by which the Hope Creek & Salem Simulators shall maintain certification.
4.0  SIMULATOR INFORMATION-4.1  G~neral  Information 4.1.1  Co-Owners Hope Creek                          I Salem Public Service Electric and Gas        Public Service Electric and Gas Company                                Company Atlantic Electric Company              Philadelphia Electric Company Atlantic Electric Company Delmarva Power and, Light
*-                                Page 1 of 14                  Date: 08/04/89 Rev. : ---'o___
 
SP-206
 
====4.1.2 Operator====
Public Service Electric and Gas Company
* 4.1.3 Hnroe Creek Manufacturer:
The Singer Company, Link Salem Electronic Associates, Inc.
Simulations Division I                                  I 4.1.4  Reference Plant:
Hope Creek                    .        Salem Hope Creek Generating Station,          Salem Nuclear Generating Station, Unit 1                                  Unit 2 4.1.5  Type:
Hope Creek General Electric Boiling Water I Westinghouse Salem Pressurized Water I
* Reactor                                Reactor 4.1.6  Date available for training:
Hope Creek                              Salem February, 1985                          February, 1984 4 .1. 7 Type of Report:
Hope Creek                              Salem Update                                  Initial Page 2 of 14                Date: 08/04/89 Rev.: - -O
                                                                      ---
 
SP-206 4.2  Control Room 4.2.1  Physical Arrangement
* The simulators were designed as a virtual replica of the reference plant control room. Notable differences_
required to enhance training and safety include:
Video cameras and ceiling mounted microphones used to record and/or monitor operator training sessions Fire detection and suppression equipment protecting -
the simulator complex Appendix 1 contains a complete listing of the physical differences between the station and the simulator control rooms:
4.2.2  Control panels included in the simulator:
ir==;;;e Creek                          Salem 0 Remote Shutdown Panel                &deg;Control Consoles CCl, CC2, CC3 0 TIP Control and Monitoring          0 Back Panels RPl  thru 9 0 Power Range Neutron Monitoring      0 Nuclear Instrumentation 0 RPS Division I/III Logic            0 SSPS Interface and Test Panels
    &deg;Control Rod Test                        (Train A)
* 0 RPS Division II/IV Logic            &deg;Flux Mapping System osPDS Console                          0 Hydrogen Recombiner  (21) 0 Radiation Monitor A/B Instrument    0 SPDS Console 0 Radiation Monitor C/D Instrument    0 Radiation Monitoring Controls 0 0perator's Monitor Console          0 Remote Shutdown Panel 0 Main Vertical  Board                0 0verhead Annunciator Panel 0 Unit Operator's Console 0 Area/Process/Airborne  RMS Console 0 overhead Annunciator Panel 0 BOP Computer  Line Printer LPl 0 Hydrogen Recombiner "A" 4.2.3  Panels/equipment not included in the simulator:
Hope Creek                            Salem 0 Shift Supervisor's Console          0 Reactor Protection System Racks 0 Radiation Monitoring Cabinet        0 22 Hydrogen Recombiner 0 SRV Acoustic Monitoring Cabinet
                                          &deg; Fire Protection System Panel
    &deg;Fire Detection Status Cabinet_          Test Push Buttons
    &deg;Communication Equipment Cabinet 0 Hydrogen Recombiner  "B"
* Page 3 of 14                  Date: 08/04/89 Rev.: - -O---
 
SP-206 4.2.4 Plant Systems
* The degree of dynamic simulation is considered to be FULL for all systems required to gupport the simulated control room panels and related hardware. Specific limitations to system models are identified in the associated Final Design Description and/or Simulator Design Proposal. Listed below are general limitations to all system models unless modified by a malfunction, remote function, or identified station response:
                      - All systems are filled and vented No boiling occurs in systems in which boiling is not a design feature
                      - All systems operate in an ideal environment; normal wear is not considered
                      - Piping or other physical barriers of a system do not fail if design pressures or temperatures are exceeded All systems that are normally-operated from the station control room are simulated with the following exceptions:
* Hope Creek
    &deg; Fire Protection 0 Post Accident Sampling 0 Hydrogen Recombiner  II B 0 Seismic Response Spectrum II Salem 0
0 TRIS Terminal Seismic Monitoring System Annunciator 0 Process Computer
    &deg; CRIDS and SPDS computers are not power dependent The following are visually simulated only and are not functional:
  ~e    Creek                              Salem
    &deg; Control Rod Scram Timing Test          &deg;CRDM Vent Fans Vibration Jacks                                  0 Shutdown NIS 0 Rosemont Calibration and Test      &deg;Flux Mapping System Jacks                                  0 SSPS Interface and Test Panel 0 Power Range Neutron Monitoring        0 Nuclear Instrumentation Testing Testing                                0 Security and Containment TV 0 Vibration Angle Phase Meter              Monitors
**
Filter and Switch Unit                0 Radiation Monitoring System 0 Digital Logic Circuit Disabled          Computers Summary Page 4 of 14                Date: 08/04/89 Rev. : _ _o___
 
SP-206 4.2.5  Simulated Control Room Environment In an attempt to provide a control room environment
* similar to that of the station control room, the following features have been incorporated:
                -
                -
                -
                -
Lighting is similar Annunciator tones are similar Carpeting is identical Communications are similar
                -  Furniture is similar 4.3 Instructor Interface 4.3.1  Location and Operation of Instructor Controls The primary location for operating and monitoring the simulator is the instructor console located in the instructor area. A list and description of the instructor controls is presented in Appendix 2.
: 4. 3. 2 Initial Conditions The simulators are capable of initializing at a number of possible preset conditions. Several of the initial conditions (ICs) are password protected and represent the simulated plant status presented in Appendix 3.
Those listed in Appendix 3 are validated, recording
* various stages of the plant operations at three different times in core life.
: 4. 3. 3 Malfunctions Appendix 4 presents a complete list of the malfunctions available to the instructor. Documentation supporting the validation of the malfunctions listed is contained in Appendix 11. The malfunction testing schedule is presented in Appendix 12.
4.3.4  Remote Functions Appendix 5 contains a complete list of the remote functions available to the instructor.
4.4 Operating Procedures 4.4.1  The operating procedures located in the simulator will be maintained to duplicate those actually found in reference control room.
4.4.2  All identified procedures are performed and evaluated to determine the ability to accomplish each on the simulator. The results of each of the evaluations are entered into the Simulator Station Procedure
* Performance Database presented in Appendix 6 .
Page 5 of 14                Date: 08/04/89 Rev. : _ _o___
 
SP-206 4.5  Changes Since Last Report
*
                                                      -
Hope Creek                            Salem See Appendix 19                        Initial Report 5.0  SIMULATOR DATABASE 5.1  Document Control A complete listing of all reference drawings utilized in the construction and modification *of the simulator is presented in Appendix 7.
5.2  Performance Criteria*Objectives 5.2.1  The arrangement of the instrumentation and controls of the simulator shall be designed to duplicate the size, shape,- color, and configuration of the reference plant.
(ANS 3.5-1985, Section 3.2.1}
5.2.2  The extent of simulation shall be such that the same action is required on the simulator to conduct an operation as on the reference plant using reference plant procedures.    (ANS-3.5-1985 Section 3)
* 5.2.3  The operator shall not be able to discern a difference between the response of the simulator instrumentation and that of the reference plant.    (Until actual plant data can be obtain, analytical, design, similar plant
                  *and/or best estimate data shall be used). (ANS 3.5-1985, Section 3.1}
5.2.4  The simulator computed values for steady state, full power, automatic control operation shall not deviate by more than 2% over a 60 minute period. (ANS 3.5-1985, Section 4.1) 5.2.5  The simulator computed values of the critical parameters related to rated full power values and interim power levels for which reference plant data is available shall not deviate by more than 2% with that of the reference plant.    (ANS 3.5-1985, Section 4.1) 5.2.6  The simulator computed values of non-critical parameters related to rated full power values and interim power levels for which valid reference plant data is available shall agree within 10% of that of the reference plant. (ANS 3.5-1985, Section 4.1)
* Page 6 of 14                  Date: 08/04/89 Rev.: ~--"o~~-
 
SP-206 5.2.7  The simulator shall demonstrate the ability to perform the minimum evolutions specified in 3.1.1 and-3.1.2 of ANS 3.5-1985. Where applicable, the acceptance
* criteria for these evolutions will be the same as the plant startup test criteria.    (ANS 3.5-1985, Section 4.2.1) 5.2.8  During transient operations the observable change in the monitored parameters will correspond in direction to those expected from a best estimate analysis and will not violate the physical laws of nature or adversely influence an operators evaluation or decision regarding the event.  (ANS 3.5- 1985, Section 4.2.1) 5.2.9  The simulator shall not cause or prevent an alarm or automatic action if the reference plant would have caused an alarm or automatic action, and conversely, the simulator shall not cause an alarm or automatic action if the reference plant would not cause an alarm or automatic action.  (ANS 3.5-1985, Section 4.2.1) 5.3  Transient Operating Conditions Database Development The simulator is capable of real time simulation of abnormal and emergency conditions resulting from malfunctions, demonstrating plant response and function of automatic controls. Simulator transient response is modeled and evaluated using one or more of the following:
* 0 0
0 0
Actual reference plant data Analytic or design data Similar plant data Best estimate data Data documenting the information used from each of these is presented in Appendix 18. This data is used to develop the Sequence of Events data base and to classify each transient tested by Performance and Malfunction Test Procedures (Appendix 11 )..
6.0 SIMULATOR TESTS 6.1  Computer Real Time Verification Computer timing is periodically verified to ensure simulation is presented in real time. The results of this evaluation is presented in Appendix 8. Computer timing is accomplished using the methods presented in Appendix 8 at the discretion of the Simulator Configuration Engineer .
* Page 7 of 14                  Date: 08/04/89 Rev. : - - -
 
SP-206 6.1.1  Time and Memory Calculations
* Hnne Creek This program will display and/or print the time used by each task running in the respective computer system. This method can be used I Salem N/A I
to verify each executive is cycling in the*required time.
6.1.2  Frame Slip Counter Hope Creek                  .        Salem A frame slip counter datapool variable can be monitored to verify the executives do not halt                  N/A or go beyond the required run time.
6.2  Normal Operations 6.2.1  Mass and Energy Balance
* Appendix 9 presents the results of the mass and energy balances performed at three points over the power range for which plant data is available. The mass and energy balance is performed annually as part of the ANS 3.5 Appendix B Operability testing.
6.2.2  Drift Verification Appendix 9 contains the results of the steady state drift verification test performed at 100% power, equilibrium xenon. The test results are logged every 10 minutes during the one hour demonstration.
Simulator drift verification is performed annually as part of the ANS 3.5 Appendix B Operability testing.
6.2.3  Normal Plant Evolution&
The normal plant evolutions required by ANS-3.5-1985 Section 3.1.1 are presented in Appendix 10.
6.3  Abnormal/Transient Operations 6.3.1  Performance testing is conducted to demonstrate the c~pability of the simulato~ to correctly perfo~m the evolutions identified in ANS 3.5-19851 Section 3.1.2.
* The tests are conducted and compared with the established transient databases contained in the Performance or Malfunction Test Procedure (Appendix
: 11) . .
Page 8 of 14              Date: 08/04/89 Rev.: __o_ _
 
SP-206 6.3.2  The abnormal/transient performance test results are recorded as part of each Test Procedure. In the evaluation of multiple components, generally only the
* results of one component were documented. In the case of multiple severities usually only the most severe variation was documented.
: 6. 4 Annual Operability and  ~1alfunction Tes ting 6.4.1  ,'\s a minimum, simulator operability is demonstrated annually by performance of the following tests:
              -  ~ass and Energy Balance as outlined in Appendix 9
              - Simulator Drift Verification as outlined in Appendix 9
              -  Transient performance by performing all events identified in Appendix 12, Annual Operability and Malfunction Testing The collected data will be evaluated and the applicable appendices updated to reflect the current state of simulator performance; the data replaced will be placed and held in historic files.
6.4.2  All simulator malfunctions are periodically tested to ensure all are evaluated at least once every four years. Appendix 12 contains the Annual Operability and
* Malfunction Testing Schedule, presenting the rotation schedule for all Performance and Malfunction Tests.
Each test is assigned a p~rformance frequency meeting all of the following criteria:
              - all events that are part of ANS 3.5 Appendix B (Operability) are performed once a year
              - at least 25% of all events identified in ANS-3.5-1985 Section 3.2, Plant Malfunctions, are performed annually, where all are evaluated within the four year cycle
              - all other malfunctions are evaluated at the rate of 25% per year where all are performed within the four year cycle The collected data will be evaluated and the applicable appendices updated to reflect the current state of simulator performance; the data replaced will be placed.
and held in historic files for a minimum of four years .
* Page 9 of 14                Date: 08/04/89 Rev.: - - -
 
SP-206 6.5  Simulator Operating Limitations To achieve real time simulation, it is often necessary to
* simplify the engineering code. A possible result of these simplifications is violation of the physical laws of nature.
It is also possible for the simulator model to allow operation beyond the design limitations of the reference plant.          During simulation, specific simulator operating limits are continuously monitored in order to avoid negative training.
If one or more of these conditions are reached, simulation may not be correct. It is the responsibility of the instructor to evaluate whether it is necessary to terminate the training exercise.
Hope Creek                                Salem I                                4 I                                        I If one or more points exceed their        If one or more points exceed limit, a }:'el low "LIMITS" light on      their limit , OHA 2\-25 (ELEV the instructor console will begin        TRBL) will alarm, also at the to flash. This will alert the          instructors console the monitor instructor that a simulator              CRT will flash "SIMULATOR operating limitation has been            OPERATING LIMIT EXCEEDED" (white exceeded. The instructor can      J on red background) . These will then evaluate which operating            alert the instructor that a limit was exceeded by typing              simulator operating limitation "limits" on any Gould 97 TSM>            has been exceeded.
prompt .
* Hope Creek
              - When the below parameters reach or exceed the following limits:
Salem I
I                                        II 0
Drywel1 pressure >65 psig              &deg;Containment Pressure >49 psig 0 Drywell pressure <-3 psig              0 Reactor Coolant System Pressure 0 Drywell temperature >340 op              >2735 0 Suppress ion pool temperature          0 Hot est Inc ore Thermocouple
      >212 o F                                >1200&deg; F 0 Suppression pool level <O or            0 RCS Void Fraction >50%
      >180 inches 0 Reactor pressure >1500 psig 0 Any cooling water system at or above its saturation condition
* Page 10 of 14                    Date: 08/04/89 Rev. : _ _o___
 
SP-206 7.0 SIMULATOR MODIFICATION 7.1  Modification
* 7.1.1  Any discrepancies in simulator performance will be so noted by writing a discrepancy report. The origination, tracking, and resolution of simulator discrepancy reports is covered by SP-203.
7.1.2  The development, implementation, and evaluation of any modifications to the simulator in accordance with SP-205.
7.2  Performance Testing 7.2.1  To ensure validation of the simulator is maintained, performance testing may be required after changes are made to the simulator software/hardware. All*
modifications to the simulator shall be evaluated to determine the appropriate level of performance test required.
7.2.la  Full Scope Performance Test A complete performance test may be required if any of the below liste~ items is applicable (This is not intended to be a complete list):
* Change in computer environment
                          - major change to computer complex
                          - major change in executive structure
                          - major change to frame tables Major modification to systems where partial scope performance test is questionable.
A description of full scope performance testing, and completed test records is presented in Appendix 15.
7.2.lb  Partial Scope Performance Test Due to the limited change in simulator response only those sections of A.NS 3. 5-1985 applicable to the modification is required. The complexity of the modification will determine the extent of the testing needed. A description of partial scope performance testing, and completed test records is presented in Appendix 16 .
* Page 11 of 14                Date: 08/04/89 Rev. : - - -
 
SP-206 7.3 Training Load Update Periodically the training load will be created to incorporate
* completed modifications and discrepancies .
At the direction of the Simulator Performance Engineer, the training load is created in accordance with SP-202, "Training Load Maintenance". The method described in SP-202 will update the appropriate appendices and databases of this procedure to reflect the new training load.
7.4 Simulator Instructor Guide The Simulator Instructor Guide provides the simulator instructor with the capabilities and functional limitations of the simulator. Only those capabilities of the simulator that have demonstrated satisfactory performance are authorized for operator training. This guide is presented in Appendix 17 of this procedure, providing the following information:
      - Outstanding deficiency reports
      - Validated and authorized malfunctions
      - Limited use malfunctions
      - Evolutions and or malfunctions not validated
      - Procedural differences between the simulator and the station
      - Physical differences between the simulator and the station
      - Cause and effects for validated malfunctions
      - Simulator "Training Load" Database
* 7.5 The Simulator Instructor Guide should be used by the simulator instructor to ensure the selected scenario guides remain within the validation of the simulator.
Annual Review Each year an annual review of the status of the reference plant to the existing simulator configuration is conducted by the Simulator Review Committee.
The Simulator Review Committee is comprised of members of the simulator support, operations training staff and the station operations department; at least one person representing each group. The committee is chaired by the Principal Training Supervisor - Simulator Support. The committee will review simulator scheduling and any training needs and requests requiring special implementation by the simulator support group. The review encompasses the following:
          *DCR/DCP Review All DCR!DCP contained in the DCP Database with a status code of 4A or greater and an impact code of "Y" (YES) will undergo a final evaluation to determine the specific scope of the modification required. The applicable DCR/DCP's are scheduled for implementation with 12 month following the review date, minimizing impact on
* the simulator training schedule .
Page 12 of 14                Date: 08/04/89 Rev. : _ _o___
 
SP-206 Station vs Simulator Hardware Differences The ~nnual photo and audio recording session is conducted as
**
described in Appendix 1 .
Operating Procedures Review All operating and test procedures identified in the Station vs Simulator Procedure Differences Database contained in Appendix 6 are checked for current revision. Any revision greater than the evaluated version of the procedure are scheduled for review and validation as described in Appendix 6.
LER Review All LERs in the LER Database contained in Appendix 13 are reviewed for applicability to the reference plant and simulator impact. The resulting list of LERs is presented and evaluated for training impact by the Simulator Review Committee. Any LERs valuable to training and within the capability of simulator modification are scheduled for implementation.
Operator Feedback Review The outstanding operator inputs concerning simulator performance in the Operator Feedback Database presented in Appendix 14 are reviewed for applicability and impact on the simulator by the Simulator Review Committee.
Discrepancy Reports All DRs outstanding at the time of the annual review are evaluated for impact, adjusting the priority of resolution as necessary.
* Simulator Reference Database Review The revisioIT of all drawings listed in the Simulator Reference Database contained in Appendix 7 are compared to the existing revision of the station drawings. Any differences are evaluated and the simulator database is updated to reflect the higher revision following modification as required.
Malfunction Assessment The following information is evaluated and utilized (when available) in the review of existing, and in the development of new malfunctions:
0 Job Task Analysis 0 Licensee Event Reports 0 Significant Event Reports 0 Operations Reports 0 Significant Event Notifications 0
Technical Information Service Bulletins 0 NRC Bulletins and Circulars 0 Local Site Considerations 0 Plant Specific Operating Experience 0 Probabilistic Risk Assessment Studies The above items are evaluated for training merit and simulator capability for the development of new malfunctions. If the training benefits are desired the
* simulator is modified as required to support the selected events. All existing malfunctions are also reviewed and recommended for deletion if no longer applicable to the established training programs.
Page 13 of 14              Date: 08/04/89 Rev~ : _ _o
___
 
SP-206 Based upon the findings and recommendations of the committee, the Principal Training Supervisor - Simulator Support will prioritize the implementation of any
* simulator modifications. The prioritization will account for simulator training usage, manpower availability, and relative merit of the modification. If the prioritized forecasted implementation schedule is beyond the means of the simulator's support group budget or manpower, the Training Review Group will resolve open issues based on a cost benefit analysis.  (The Training Review Group consists *Of management employees responsible for plant operations, training and simulator support}.
8.0 Simulator Update Reporting 8.1 A Simulator Update Report will be submitted to the NRC in either of the following circumstances:
8.1.1  Every four years, on the anniversary of ~he initial submittal, identifying any uncorrected performance test discrepancies and a schedule for resolution.
8.1.2  A significant change to the existing configuration management system requiring an updated submittal.
8.2 Each year, following the Annual Review, the Configuration Management System is reviewed to determine if an updated submittal is required. The review includes, but is not
* limited to the following areas:
8.2.1  Major administrative changes.
8.2.2  Addition, deletion, or significant modification of Performance Test Procedures.
8.2.3  Revision of the Operability and Malfunction Test Schedule.
8.3 A summary of the Simulator Update Report identifying changes from last report are contained in Appendix 19 .
* Page 14 of 14              Date: 08/04/89 Rev.: - - -
 
SP-206 HOPE CREEK & SALEM SIMULATORS Station vs Simulator Hardware Differences Database
* The physical fidelity between the simulator and station control room hardware is reviewed as part of the Annual Review. The arrangement and control room environment are evaluated utilizing one or more of the following as determined by the Simulator Configuration Engineer:
Static Photography: All simulated panels of the control room, are photographed in color with sufficient resolution to determine:
all switch, status light, and annunciator engravings all component, meter, recorder, and indicator scale graduations, mimics, and labeling all operator aid lamicoid engravings and placement Video Recording: The entire control room is recorded on videotape to obtain an overall orientation and placement of movable objects/materials such as tables, bookcases, procedures, etc.
Audio Recording: The control room audio environment is recorded to obtain a background "noise" level. All annunciators are individually recorded for volume, tone, and rate characteristics.
The collected data is reviewed and the simulator panel drawings are updated by the Simulator Support Group as required. All differences are identified in the associated Simulator Differences Database and evaluated for training impact and assigned one of the following status codes by the Simulator Performance Engineer:
N    None        No confusion or error likely {e.g. change in font) s    Slight      May result in minor disorientation, no error likely
{e.g. smoked vs. clear bezel, letter spacing, etc)
M    Moderate    May result in confusion, recoverable operator error possible {e.g. labeling or scale graduation errors)
L    Large      May inhibit operator attention/action, non-recoverable operator error possible {e.g.
equipment/control relocation, addition, or removal)
All data will be entered into a database from which a monthly Simulator Status Report is generated. This report will be used to track progress and aid the Principal Training Supervisor - Simulator Support in material acquisition and work scheduling.
The database is comprised of the following fields:
PHOTO NUMBER/VIDEO FRAME  Reference documenting the hardware differences.
COMPONENT    The affected component/device.
* PANEL  The affected panel where the difference is located .
Appendix 1                  Date: 08/04/89 Page 1 of 2                Rev. : - - -
 
SP-206 ITEM NUMBER The simulator designator for the affected component/device
* GROUP NUMBER The bezel group number for the affected component/device CATEGORY Component group where the difference exists.
entries include:
Possible Annunciators Controllers Demarcation lines Meters Mimics Operator Aids Recorders Status lights Switches DESCRIPTION    Brief description of the identified difference.
DATE IDENTIFIED    Date the hardware difference was noted.
IMPACT Impact assessment as assigned by Simulator Performance Engineer.  (Not applicable to Salem Simulator vs Salem Reference Plant Unit 1)
DATE FIXED    Date the hardware difference was corrected .
* All proposed changes to the simulator hardware are evaluated by the Simulator Configuration Engineer for possible software modification to support the change (i.e. meter scale change, the addition/deletion of a status light, switch, or annunciator). If a software change is required to support the hardware modification , a work package is developed in accordance with SP-205.
If a software change is not required (i.e. a change in font on a label plate, or the addition of an operator aid) the change is made by the Simulator Support Group as scheduled. The simulator database is then updated to reflect the modification .
* Appendix 1                  Date: 08/04/89 Page 2 of 2                Rev. : ---'o___
 
SP-206 HOPE CREEK/SALEM SIMULATOR SIMULATOR vs STATION DIFFERENCES
* PHOTO NUMBER/VIDEO FRAME:
ITEM NUMBER:
COMPONENT:
PANEL:
GROUP NUMBER:
CATEGORY:
DESCRIPTION:
                                .
IMPACT:
* DATE IDENTIFIED:
CATEGORY  Possible entries include:
Annunciators DATE FIXED:
Controllers Demarcation lines                Meters Mimics                            Operator Aids Recorders                        Status lights Switches IMPACT  Possible entries include:
N      None        No confusion or error likely (e.g. change in font) s      Slight      May result in minor disorientation, no error likely (e.g. smoked vs. clear bezel, letter spacing, etc)
M      Moderate    May result in confusion, recoverable operator error possible (e.g. labeling or scale graduation errors}
L      Large      May inhibit operator attention/action, non-
* recoverable operator error possible (e.g .
equipment/control relocation, addition, or
                          -removal}
Appendix 1                  Date: 08/04/89 Rev. : _ _o___
 
Page No .
  . 12/26/89
                                                        - SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT . PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE      RECORD IDENTIFIED IMPACT FIXED NUMBER
  =========== =============== ========== ======= ====== =============== ==================== ========== ====== ======== ======
5.45                                  AH5/6    (1-7) RZ KEY            OFF/ON LABEL MISSING 10/20/89    N                      5' COLOR OF RING AROUND 10/31/89    N                    52 RESET P/B IS INTERLOCK 2R45-2R41 BLACK IS BLACK AT STATION
* PLACKARD        MISSING: DO NOT
* 11/03/89      N        I I      lOJ BLOCK OPEN FIRE DOOR NO 210-2 OHA              A17 SHOULD. BE: ANNUN 11/03/89  M      11/03/89    106 GRND DET
                                                                                                                        ?
OHA              A41 SHOULD BE:        11/03/89  M      11/03/89    107 CNTMT SMP PMP START                          -_~.
* OHA              A43 SHOULD BE: AUX 11/03/89. M                      108 ALM SYS GRND DET OHA              D36 SHOULD BE: CH C 11/03/89    s        I I      109 DECRE*ASING SHUTDOWN MARGIN OHA              D44 SHOULD BE: CH D 11/03/89    s                  i-10 DECREASING. SHUTDN MARGIN OHA              E24 SHOULD BE: 2/4. 11/03/89    s        I I      111 CW BRG LUBE PRESS LO PMP TRIP OBA              G3 SHOULD BE: GEN    11/04/89 . M      .I          112 LIQ DETS LVL HI OHA              G4 SHOULD BE: SEAL 11/04/89      M        I        113 OIL SKID MOTOR TRBL OHA              Gll: MAIN SEAL OIL 11/04/89      M                  114 PMP EMER BKR CLS
* OHA              Gl2: MAIN SEAL OIL 11/04/89      M                  115 PMP EMER BKR CLS
 
Page No. 2 12/26/89
                                                      ~    SALEH SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE. UNIT 2 SORTED BY PANEL
* PHOTO #/                .
VIDEO FRAME COMPONENT *~*._ *PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER
  =========== =============== ========== ======= ====== =============== ==================== ========== ====== ======== ======
OHA              G20: EMER SEAL OIL 11/04/89    M                  115 PMP MOTOR RUN OHA              G27: SMOKE IN GEN    11/04/89  M                  117 OHA              G28: EMER SEAL OIL 11/04/89    M                  118 PRESS LO OHA              G44 SHOULD BE: BLANK 11/04/89  M                  119 OHA              G47: GEN STAT WTR    11/04/89                      120 FLOW I PRESS LO OHA              G6: GEN EXC FLO      11/04/89  M                  121 OVER CURRENT
                                                                                                                        }
OHA              Gl4: GEN FLD OVR      11/04/89  M        I  /. 122 VOLT
* OHA OHA Gl6: GEN &TAANS OVERALL DIFF B.U. &
25 KV GRD.
11/04/89 G22: GEN VOLT I REQ 11/04/89    M 123
:24 HI OHA              HlO: MN XFMR 03 OIL 11/04/89    s                  125 LV~ LO I MISC TRBL OHA              H34: 22 STA XMFR      11/06/89  s                  125 TAP CHANGER TR.BL OHA              Jl6: STATION HAS NO 11/06/89                  I      127 RED STRIPE                                      ./
OHA              K48: 'POPS' CH. 1 11/06/89      M                  128 AUX AIR .PRESS LO OHA              KS: BLANK            11/06/89                      129 OHA              K2: 'POPS' CH. 1      11/06/89  M                  130 AUX AIR PRESS LO
* MISSING KEY WITH A 11/06/89 LABEL: FIRST OUT s                  136.
 
    - - - .. - **~ :: ~ :_-:.::_~ ';-.
Page Nii.
12126/89
_ SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
* PHOTO #!
7:DEO FRAME COMPONENT                PANEL ITEM GROUP NUMBER NUMBER CATEGORY          D3SCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED
  =========== =============== ========== ======= ====== =============== ==================== ========== ====== ======== ======
ANNUNCIATOR ~ESET RECORD NUM:JER UNIT 2 1008: NEXT TO TURBINE ?IRST OUT RESET PARTY CHANNELS      11/06/89  N                i37 SOCKETS ON RIGHT HAVE NO LABELS AT STATION C090                            SHOULD BE WHITE ON  11/10/89  M        I I    201 RED: POWER SYS STABILIZER ON C905H                            SHOULD BE WHITE ON  11/10/89  M                202 GREEN: POWER SYS STABILIZER OFF C905T    6-19  R2 LENS          SHOULD BE WHITE ON  11/10/89  M                204
* GREEN: REGULATOR MANUAL LABELS          WHITE ON BLACK      12/19/89                    216 MANUFACTURERS LABEL ON UPPER LEFT OF HYDROGEN COMBINER CABINET ALSO nLACK ON WHITE LABEL TO THE RIGHT REFERENCES NO. 22 NR-41                            SCALE            INCORRECT SCALE 0-5 10/27/89                        22 AT STATION. (WHITE ON BLACK)
AD22    1-2    LABEL            BOTTOM LABEL READS: 10/20/89    s        I I A-VIB Ll 730        PA9670 2CC1        AD22    1-2    LABEL            TOP LABEL READS:    10/20/89  s.        I  I LEAK          CONT DETEC-        DIFF TION          PRESS LEVEL
* Page No.
  ;2/25/39
                                                                            - ~ALEM SI MULA TOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL .
* PHOTO '4!
VIDEO ~~AME COMPONENT          PANEL ITEM GROUP NUMBER NUM3ER CATEGORY                J~SCRI?TION DATE              DATE IDE~TI?:ED IMPACT 2IXED
  =========== =============== ========== ======= ====== =============== ==================== ========== ====== ======== ======
RECO~D NUMBER
                                  ')(''I,"'.!
:.. ~ ... *~* l                  1-8        RY INDICATOR      LEFT ~NJICATOR          i0/21/S9  N (TEMP) ~S BGANK.
2CC1                              l -S        LABELS            ~OP ~ABEL R~AbS:        l0/21/39 PRESS BOTTOM LABEL READS A-VIB PI942 2CCl                    AI07 ,08 1-8        ~ABELS            30TTOM LABELS READ: l0!2ii89      N 22-MAC 2CC1                    AI09,:0 1-8          ?-Y  INDICATOR    RIGHT HAND SCAL2 IS 10/21/89                I I
* Aill,l2                                BLANK 2f'f"          1
                                    *.... \....:..      AI12                LABEL            ARROW UNDER l -8        10/21/89    ~                  10
[228493i 2re' vvl                AOOl/2
                                                                    ....
i~-l !
                                                                        ~ !
LABELS            2WL96          2WL97    l0/2l/89                        --
2WL98          2WL99 SIM\JLA~OR
                                                                                                -------------------
2WL98          2WG99 2WL96          2WL97 STATION
                            ... 2CC1                    A004    {2-1} LABEL                  2WL12            2WL16 10/21/89            I I        ,
H
                                                                                                                                                          ~
2WL15            2WL12 (STATION)        (SIM) 2CC1                    AQ6      (2- 3) LABEL                  8MER AIR COMPR          10/21/89    s                  'I l~
SHOULD HAVE RED BKGD 2CC1                    A409      1- i3      RZ  P/B          SCALE IS NON-LINE, 11/06/89                          110
                                                                                                                                                    .!. Ju SHOULD BE SIMILAR TO
* A410
 
.-::- ~*- . . #*-*=-*--~;--~:~~~-~~;:~JJ_~~~r;~~~~r~0~,~~~~~~\~~~~:~~: ::::*:-*                    *:.;~ *.:, o;-1':*:~-~':' .~_
Page No.                5'                                                    - --
12/26/ 89
_ SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
* PHOTO #/
VIDEO fRAME COMPONENT:.*;*_- _PANEL ITEM GROUP NUMBER NUMBER CATSGORY                                  JESCRIPTION
          =========== =============== ========== =====~= ====== =============== ==================== ========== ====== ======== ======
DATE              DATE
                                                                                                                                                      ~DENTIFIED IMPACT FIXED RECORD NUMBER 2CCl                                HJ      LABEL                              1-13 (228495)        11/08/89  s                167 2CC1                                        LABEL                              ABSOLUTE PRESSURE 11/08/89                        169 1-17                                        SHOULD BE - PRESSURE 2CC1                    A807      1-17. RY INDICATOR                        INDICATOR PA9607    11/14/89                    170 INSTALLED AT THAT LOCATION 2CC1                    AM04      H        LABEL                              TOP LABEL MISSING:    11/08/89  N                174 IN TEMP: OUT TEMP 2CC1                    AMOS      2-8      LABEL                              TOP LABEL MISSING:    11/08/89  N                17 s DIFF PRESS 2CC1                    AN03      2-9      LABEL                              BOTTOM LABEL          11/08/89  N          I    176 MISSING: A-VIB
* 1A5064 F1601A 2CC1
* 2CC1 A605 AA22 1-19 HS LABEL RY IND.
C-VIB. 1A5064 SCALE NON LINEAR SHOULD BE 0-2-4-6-8-10 LINEAR 11/08/39 11/08/89 N                l58 p~
                                                                                                                                                                                  .._I 0 F1501B          2CC1                    AA24      1-15    RY IND.                            SCALE NON LINEAR,    11/08/89                    173 SHOULD BE 0-2-4-6-8-10 LINEAR FA-5241 TO      2CC1                                2-4      VENTRACK                          RECORDER SCALES ARE 10/21/89    N                  13 FA-S244                                                      RECORDER                          WHITE ON BLACK AND 0 It~.  ,.-, * .~Z"' ,;;' * *                                            - 1.2 FA1640k                                  AA20      1-15    RY INDICATOR                      INCORRECT SCALE      11/08/89  s        I I    171
                                                  ~~: . .'                                                                    SHOULD BE 0 - 75 GPM.
X10 2 LINEAR L1730,PA9607*  2CC1                    AD22      1-2      RY INDICATES                      THIS ITEMS IS DUAL 10/20/89                I I INDICATOR PA9607 ON THE RIGHT OUTLET WATER    2CC1                    AD4/8/              RY INDICATO_R                      SCALE GRADING IS      10/21/89  s        I I 12/15/                                                DIFFERENT 20                                                                          ----
* 2CC2                                H        LABEL                              LABEL: 3-8    228512 10/21/89  N                  15
 
Page No. 6 12/26/89
                                                                        ~  SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2
                          .                                                SORTED BY PANEL
*
                        .      ~*:
                          ...:._-.. .---:
PHOTO #/                                                  ITEM GROUP                                          DATE              DATE  RECORD VIDEO FRAXE COMPONENT . . - PANEL      ...
NUMBER NUMBER CATEGORY        DESCRIPTION          IDENTIFIED IMPACT FIXED NUMBER
  =========== ===============- ========== ======= ====== =============== ==================== ========== ====== ======== ======
IS LOCATED TO THE RIGHT OF HEADERS LABEL 2CC2                        GRAPH PLACKARD RCS TEMP GRAPH        10/21/89            I I      16 PLACKARD IS LOCATED BETWEEN (PRIMARY WATER FLOW) AND 3-5 GROUP 2CC2                  3-6    LABELS          LABELS ON THE        10/21/89  H                  17 COUNTERS ARE DIFFERENT THAN THAT OF SIMULATOR 2CC2                  3-10  SCALES          REACTOR COOLANT      10/21/89              L      18 SYSTEM RECORDER SCALES ARE BLACK
* 2CC2                  4-1    LABEL            NO TRIP SETPOINT    10/27/89  s        I I      20 PLACED NEXT TO NUCLEAR POWER RANGE RECORDER 2CC2          CK03/4 S-1    R2 P/B SWITCH    23AR22 COND VLV OPEN 10/28/89  M        I I      29 23AR23 PRIME TANK VLV OPEN (AT STATION) 2CC2                        LABEL            LEFT ALARM ACKNOW    11/06/89  s
* 1*
lJl P/B HAS NO LABEL 2CC2.                                        PARTY CHANNEL        11/06/89  N                132
                                                    *.... :.
SOCKETS ON LEFT HAVE NO LABEL AT STATION
                                                      .,
LABEL            RED P/B HAS NO      11/06/89  s        I  I    133 LABEL: RADIATION ALERT 2CC2                        LABEL            SOUND POWER JACKS    11/06/89  N        I  (    134 HAVE NO LABELS AT STATION 2CC2                        LABEL            PHONE HANDSET HAS NO 11/06/89  N        I I    i35
* LABEL AT STATION
 
Page No.      T 12/26/89
                                                      - SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
* PHOTO #!
VIDEO FRAME COMPONENT ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE    RECORD IDENTIFIED IMPACT FIXED NUMBER.
  =========== ==========~~~~~*========== ======= ====== =============== ==================== ========== ====== ======== ======
2CC2        B129  3-21    LABEL            WRONG LABEL SHOULD  11/08/89                    177 BE: B-VIB 2CC2        Bl45  3-20    PUSHBUTTONS      IS YELLOW ADDRESS    11/08/89  s                178 ENGRAVED SHOULD BE RED NO ENGRAVING 2CC2        B532    4-20  LABEL            BOTTOM LABEL FAR    11/08/89  N        I I    18 o RIGHT INDICATOR SHOULD BE: PA5099 2CC2        B619    4-16  RY SCALE        SCALE SHOULD BE 0    11/10/89            I      184
                                                                          -10 CNTL ROD CNTR  2CC2                      COUNTERS        TABLE ON EACH        10/27/89  s          l      27 COUNTER DIFFERENT AT STATION                                    ..
* AGRPl        AGRP2
                                                                        *BGRPl          BGRP2 CGRPl        CGRP2 DGRPl        DGRP2
            .LA5187          2CC2        B546  4-18    RY SCALE        SCALE SHOULD BE 0 - 11/08/89                      182 32 LOW STEAM PRESS 2CC2        BDOl  4-3,4- R2 P/B LENS      P LENS READS:        10/28/89                      28 BEOl  4, 4-9                      LOW BMOl                            STEAM PRESS AND IS OLD MYLAR OPP WHITE COLOR
                        ,.
NA5155                            4-18    RY IND. SCALE    SCALE SHOULD BE 0 - 11/08/89                      181
                                      }:
10 NR-42  "-,<                        H      SCALE            SCALE WHITE ON BLACK 10/27/89  s.                23 AT STATION NR-43          2CC2              4-5    SCALE            INCORRECT SCALE 0-5 10/27/89    s                  24 AT STATION (WHITE ON BLACK)
* NR-44          2CC2              H      SCALE            SCALE WHITE ON BLACK 10/27/89            I I      25
 
  ?age No.
12/26/89
_ SALEM SlMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
* PHOTO *1 VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER. ~UMBER CATEGORY          DESCRI?TION DATE              DATE IDENTIFIED IMPACT FIXED RECGR~
NU~BER
              ?I-~42A,?I-:23A 2CC2      B426    4-14  RY I~D.          SCALES ON LEFT AND  11/08/89  L                  17 9 RIGHT ARE WRONG.
2HCULD BE: o-1n L3FT; J-20 RIGHT RSACTOR COOLANT 2CC2              3-12    ECGRDER          ALSO TWO SCALES      10/27 /89  L                    19 INSTALLED SIDE BY SIDE 0-1500. 0-120
                                                                          .~T THE STATION 3A2292,?15COM              8518    4-15  RY  SCALE        SCALE SHOULD BE 0 - 11/10/39    L        I I      183
                                                                          ~'
IJ XA-S904        2CC2              4-1    LABEL            NO LABEL AT THE BCTT 10/21/89            I I        2l OF XA-5904 (CHART USED TO CALCULATE CCRE BURN UP MARK ALL SPEED AND N.I.
* CHANGES)
XA-1740        2CC2              4-5    3CALE            SCALE jHITE ON BLACK 10/27/99            '
I I
26 CKll/12 S-1    R2 P/B            SCALE GRADING        10/28/89                        30 13                              DIF?ERENT 0-7 2 AT STATION 2CC3      CK15/15 S-12  RY IND          NO BOTTOM            10/28/89 LABELSFFERENT RC24-5 RC28-5 2CC3      CB15-  6-3    RY IND            SCALE GRADING        10/28/89  M        I I        32 DIFFERENT 80 40 0 40 80 AT STATION 2CC3              NEXT                    LOAD DISPATCHER      10/28/89                      33 TO 6-5                  NAMEPLATE DIFFERENT NEXT TO 5-5 2CC3      CI05    5-6    LABEL            TOP LABEL OF CI05    11/10/89                      :85
* SHOULD BE RED AND SHOULD READ:
 
  - - -    - - -  -
                      *.r*.
Page No. 9
:2/25/89
                                                        - SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SO~TED BY PANEL
* PHOTO #/
VIDEO ~RAME COMPONENT      PANEL ITEM GROU?
NUMBER 'UMBER CA~2GO~Y          DESCRIPTION E~ERGENCY  250 V JATE              DATE IDE9TIFIED ~HPACT FiXED R3CO~J
                                                                                                                          '.IUMB ~R
    =========== =============== ========== ======= ====== =============== ==================== ========== ====== ======== ======
2CCJ      Ci05  ~  5-6  R2 LENS          LENS SHOJLD BE BLANK 1~!10!8?            I I        185 WHITE 2CC3      Cl09    6-1    ?/B GENS        P/8 LENS 3HOULD BE  11/lC/89                        187 3LANK n~ACK .
2CC3              6-l    TAGGED KEY      KWY WITH THE TAG: EH 11/10/8~*                      l8B CONTROL PANEL UNIT 2 SHOULD BE AT UPPER CORNER Of 6-1 2CC3      CJlOP  6-11  R2 LENS          SHOULD 3E WHITE ON  11/10/89 RED: 2E6D CLOSE 2CC3      C310T  6-il  R2 LE~S          SHOULD BE WHITE ON  !l/lG/89                        190
                                                                          ~REEN:  2EGD OPEfl
* SHOULD BE WHITE ON  1!/10/89              I            c ~
2CCJ      C510P
* 6-15  R2 LENS                                                    !  I
                                                                                                                        !        T RED: 2GGD CLOSE 2CC 3      C510T  6-15  R2 LENS          SHOULD B~ ~H!TE ON  11/10/89 GREEN: 2GGD OPEN 2CC3      C504L  6-15  R2 ~ENS          SHOULD BE BLANK      11/~0/89          ll/~0/89      '. 01
                                                                          ~HITE 2CC3      C604A  6-16  R2 LENS          SHOULD B8: MIMIC    li/10/39          !li:0/89      :?4 3US ~NTERLOCK CLOSE SELECTION 2CC3      C902    5-:9  RY SCALE        RY IND. SHOULD BE    11/10/89  M        I I DUAL INDICATOR, SCALES SHOULD BE 0 -
60 2CC3      C903    6-19  R2 LENS          SHOULD BE WHITE ON  11/10/89  M RED: RAISE OUTPUT VOLTS 1 0 '"1 2CC3      C901    5-19  R2 LENS          SHOULD BE WHITE ON 11/10/89    M                    - JI RED: EXCITER FIELD BKR CLOSE
* 2CC3      C904    6-19  RY ~ND.          SHOULD BE LEFT CHANN. IND. ONLY.
li/10/89  M
 
                                                                                                                                                *~
                                                                                                                                                  !
Page No. 10 l2/26/89
                                                              ~  SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
* PHOTO #/
V~~EO ?iAME COMPONENT          PANEL ITEM GROUP NUMBER NUMBER CATEGORY            DESC.1IPTION DATE              DATE I~ENTIFIED IMPACT FIXED
  =========== =============== *========== ======= ====== =============== ==================== ========== ====== ======== ======
SCAlE SHOULD BE 0 -
RECORD N:J~5 ER lOJ;XlO 2CC3          C905    5-19    ~ABEL            TOP LABEL MISSING:    ll/~0/89  . ~                  ~99 STABILIZER/REGULATOR 2CC3          C9v5A  5-19    R2 LENS          SHOULD BE BLANK      llU/89      M                  200 WHITE 2CC3            C905P  5-19    R2 LENS        *SHOULD BE *WHITE ON li/10/89      M        I I
i    203 RED: REGULATOR AUTO 1('(' 1 t..1..-v J      C9C5    5-19    ~y  :ND.          SCALE SHOULD BE:      lli 10/89  M                  205 0 -10 2CC3            C908T  6-10
* J  R2 LENS          SHOULD BE WHITE ON    11/10/89    M      I I        206 GREEN: LOWER AUTO SET PT (DEC VOLTS)
* 2CC3 2CC 3 C908P C908L 6-19 5-19 R2 LENS R2 LENS SHOULD BE WHITE ON RED: RAISE AUTO SETP~ iINC. VOLTS)
SHOULD BE WHITE ON GREEN: VOLTAGE 11/10/89 11/10/89 M
M      I  I I
                                                                                                                                        ~~1 C.V I
                                                                                                                                        !
                                                                                                                                        '\I' Q lJ lJ MATCHING OFF 2CC3            C908H  6-19    R2 LENS          SHOULD BE WHITE ON    11/10/89    M                  209 RED: VOLTAGE MATCHING ON 2CC3            C908D  6-19    R2 LENS          SHOULD BE WHITE ON    11/10/89    M      I I        210 GREEN: AUTO TRACKING OFF
                          .... 2CC3            C908A  6-19    R2 LENS          SHOULD BE WHITE ON 11/10/89        M                  211 RED: AUTO TRACKING ON SUPV LIGHTS      2CC3                            LABEL I HOLES    SUPERVISORY LIGHTS 10/28/89        s      I I          34 LABELS ARE ABOVE THE LIGHTS (AT STATION)
COLUMN OF HOLES [ 4)
EXISTS TO THE RIGHT  --
* OF LAMPS AT STATION
 
Page No. 11
  '.2/25/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
* v=JEO FRAME COMPONENT        PANEL ITEM GROUP NUMBER NUMBER CATEGORY            DESCRIPTIO!l DATE              DATE IDENTIFIED IMPACT FIXED RECORD
  =========== =============== ========== ======= ====== =============== ==================== ========== ====== ======== ======
              .....
              ~  '1 ~~~IC      2CC3 MIMIC                '.iABEL            LABESL AT i.!PPE~    10/23/89                      35 RIGHT CORNER OF MIMIC FRA~E 2ADE BKR. 15 (AT STATlONl EM BP C02  S/~  2PR5                      CMC SWITCHES      THREE 2 POSITION    10131/89  M                  ,,
11 MAINTAIN c~c SWITHCES ABC ALONG WITH LABE~S MUST BE INSTALLED AT SIMULATCR 2RP~                      MIMIC COLOR        CONTAINMENT VENT    10/31/89                I    48 PAPER              ISOLATION BLOCK IS ALSO GREEN AT
* STATION 2R?l                      PLAKARDS          RMS CHANNEL          10/31/89  N IOPERAB LE WO#
AND RMS CHANNEL SETPOINTS LOWERED PER WO#
DATE        TECH PLACKARDS ARE MISSING AT SIMULATOR 2RP1                      MIMIC AREA        CONTAINMENT APD FLOW 10/31/89  N        I I      ~O MIMIC HEIGHT IS LOW AT SIMULATOR
                              '2RP1                      MIMIC              NOT ENOUGH ROOM POR 10/31/89 LABEL. VC7 & VCll.
IN CONTAINMENT APD REG ISOL VALVES 2RP1                      INDICATORS        CHANNEL C AND D      11/01/89            I I SHUTDOWN NIS INDICATORS ARE
* PICTURE MIMICS AT SIMULATOR
 
Page No. 12 12/26/89
                                                        - SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
* PHOTO #I VIDEO F~AME COMPONENT          PANEL ITEM    GROUP NUMBER NUMBER CATEGORY DATE              DATE IDENTIFIED ~MPACT FIXED
  =========== =============== ========== ======= ====== =============== ==================== ========== ====== ======== ======
                                                                                                                              ~ECORD N:JMBE:R 2RP1                      DIGITAL          CHANNEL C AND D      11/01/39            I I I        59 INDICATORS        SHUTDOWN NIS MONITORS ARE ercTURE MIMICS AT SIMULATOR r ,,
2RP1                      LABELS            NO LABELS: SERVICE 11/01/89              I I        :Jl1 WATER VALVE
                                                                              ?OS IT ION: 2 ,\DC BREAKER 3:
CN TOP OF INDICATOR AT SIMULATOR lBQ 1-1850 2RPl                      LABELS            EACH WINDOW SHOULD 11/01/89              I I          61
                                                                              ~AVE  A LABEL AT THE LOWER POSITION lBOl-1850
* 2RP1                      INDICATOR WINDOWS FOLLOWING WINDOWS ARE MISPLACED AT SIMULATCR:
22SW134. 22SW174, 24SW223, 23SW223, 22SW223, 21SW223, 11/01/89  M      11/01/89      '1 0<
21SW57, 23SW2l8, 24SW223, 21SW55, 22SW85, 23SW85 2RP1                      LABEL            INSTRUMENT NUMBER    11/01/89                        r1 OJ LA3390 MISSING PROM ITEM 1923
                        .. *.
                              . fRPl                      LABEL            INSTRUMENT NUMBER    01/11/89                        54 LABEL LA3389 MISSING FROM ITEM 1922 2RP1                      LABEL            INSTRUMENT NUMBER    01/11/89            I I        65 LABEL LRB-0010 MISSING FROM ITEM 1924 2RP1                      RAD DETECTION
* RADIATION DETECTION 11/03/89    M                    104 MISSING IN THE CORNER OF ROOM ABOVE
 
~~~n~!?~~;;:~;~~~::~T-'f;"f~;:1~}1f~~1~~7~-s~~::~~~;0:~*:* f'~-~~-~~~~ p:::'***'.                            ..:r.'.~~f:~~~"'):i~t;,,.~~-~~'x-;~:&sect;r?" :. '*
0 12/26/89
                                                                                    - SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
                              ~;::zic *. *.
* PHOTO !/
VIDEO FRAME COMPONENT;l~~:~;~~::,;:e>.NEL
      . ===========
                                  . -:-:.... ..:;.~--..::.:.,
                    =========:=====~-*:==========
                                                                        !IBM    GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE  RECORD IDENTIFIED IMPACT FIXED NUMBER
                                                                        ======= ====== =============== ==================== =====.===== ====== ======== ======
RMS MONITOR 2PA4144                                  2RP1                      RECORDER        BELOW ITEM 1905 AT              11/01/89        M            56 STATION 2PA4146                                  2RP1                      RECORDER        BELOW ITEM 1903 AT              11/01/89        M            54 STATION 2PA4147                                  2RP1                    . RECORDER        BELOW ITEM 1904 AT              11/01/89        M  I -I    55 STATION PAN ALARM                                2RP1                      LABEL            THE FOLLOWING LABELS 10/31/89                            I    53 ARE NOT PRESENT AT THE LEFT SIDE OF PANALARM 1 6 11 16 21 26 31 36 41
* TA6124                                    2RP1                      RECORDER        INSTRUMENT NUMBER 11/01/89                            I I      57 (TA6124) LABEL MISSING FROM CONTAINMENT DEWPOINT
                                                                                                          &TEMP RECORDER 2RP2                      LABEL            OUTER AND ELECTRIC 01/11/89                      S  I I      66 PENETRATION AREA EXHAUST: IS OFF CENTER OF ITS BLOCK.
ELEC PENETRATION AREA EXHAUST FANS MISSING AT SIMULATOR LABELS          MISSING FROM                    01/11/89        S  I I      67 RECORDERS AT SIMULATOR:
HA3280 ITEM            2501
                                                                                                        . KA3277                2502 KA3278                2503 KA3279                2504 2RP2                      KEY SWITCH      KEY SWITCH NEEDS TO 11/01/89                      S  I I      70 BE INSTALLED AT CONTAINMENT
*                            -*'
EVACUATION HARM TEST
 
Page No.      14 12/26/89
                                                      , SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
* PHOTO #/.
VIDEO F~AME COMPONENT        PANEL ITEM GROUP NUMBER NUM3ER CATEGORY          DESCRIP'I':ON DATE              DATE
                                                                                                =~ENTIFIED IMPACT FIXED RECORD NUMBER
  =========== =============== ========== ======= ====== =============== ==================== ========== ====== ======== ======
nP2.                      ~ABEL            LABEL: REACTOR HEAD 11/01/89              I I      71 VENT VALVES: MUST BE IN ONE LINE 2RP2                      LB LI WIND IND    ORDER OF REACTOR    11/01/89    M                  "~
IL
                                                    . KEY SWT          HEAD VENT VALVES SHOULD BE: 2RC40 2RC43 2RC41 2RC42; 2407 2408 2409 2410 BATTERY RM      2RP2                      CMC SWITCH      MUST BE A4 QUADRANT 01/11/89      L        I        69 EXHAUST ?AN                                                TYE SWITCH SWIT~E EACS SU~PLY    2RP2                      CMC SWITCHES    WRONG TYPE OF SWITCH 01/11/89    L                  68
* FANSWITCH 21 &                                              AT SIMULATOR MUST BS
              "!"!
              !.:.!..                                                    A4 QUADRANT SRC TYPE 2RP4                      ~ABELS          SOME LONG NARROW      ll/02/89    N                73 LABELS ABOVE AS BELOW DESCRIPTIVE LABELS ARE MISSING AT STATION 2RP4                      LABELS          P2, P6, PiO, P4,      11/02/89    N        I I    . 74 Pll, P12 LABELS ARE MISSING AT STATION 2RP4                      LABELS          INSTR.
* LABEL        11/02/89    N                1I -J MISSING XA3979 AND 3980 AND TA2228 2RP4                      P/B SWITCH      22 REACTOR NOZZEL 11/02/89        N        I I      75 SUPPLY VENT FAN AND 22 REACTOR SHIELD VENT FAN THESES LENSES ARE SWAPPED AT THE STTION ITEMS 4721
* AND 4722
 
                                                                                  . ; ..*.--
Page No. 15 12/26/89
                                                        ~  SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
* ?HOTO ii VIDEO ~RAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED RECORD llUMB ER
  =========== =============== ========== ======= ====== =============== ==================== ========== ====== ======== ======
2RP4                        c~c SWITCH      ITEM 4N01 IS POWER    11/02/89                      77 SUPPLY AAT THE STATION 2RP4                        CMC SWITCHES    ITME 4Hl8 IS POWER    li/02/89                      ~ 0 I U SUPPLY C AT THE STATION 2RP4                        SABELS          INS # LABEL LA3977 11/02/89                          79 MISSING ON SIMULATOR (STEAM GENERATOR LEVEL) RECORDER LEFT 2RP4                        LABEL            I~S  # LABEL LA3978 11/02/89              I I      8O MISSING ON SIMULATOR (STEAM GENERATOR LEVEL) RECORDER
* RIGHT 2RP4                        LABEL            LABEL: RECIRCULATION 11/02/89              I I      81 PHASE; MUST BE REPLACED BY; MANUAL 2RP4                        LABEL            LABEL ECCS POWER      11/02/89                      8*1l LOCKOUT SWITCHES SHOULD BE ON TOP OF LOWER ROW OF SWITCHES 2RP4                        P/B SWITCHES    SWITCHES: 21RH4,      11/02/89  M        I I      83 22RH4, 2SJ69, 21SJ44, 22SJ44,
                                *;,:*                                      21CC16, 22CC16 DO
_,,.                                      NOT OCCUPY SOME LOCATION AT STATION 2RP4                        P/B SWITCHES    SWITCHES 21SJ113,    11/02/89  M                  84 22SJ113 DO NOT EXIST AT THE STATION. ONE LESS CUTOUT AT THE PLANT AT THAT ROW 2RP 5                        LABEL                                  10/31/89 LABEL "COOLING FANS ------                I I
* AND PUMPS" NOT CENTERED AT
 
Page No. 16 12/25/89
                                                      ~  SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
* PHOTO #/
V!DEC ?RAME COMPONENT      PANEL ITEM    GROUP NUMBER NUMBER CATEGORY          DESCRI?TION DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER
  =========== =============== ========== ======= ====== =============== ==================== ========== ====== ======== ======
SIMULATOR IN (2 GEN MAIN TRANSFORMER)
BLACK 2RP5      5203          P/B LENS          SHOULD BE ENGRAVED: 11114/89    M                  139 AUX BLDG ELEV 55 2RP5      5204
* P/B LENS          SHOULD BE ENGRAVED: !l/14/89    M                  140 SI? &CCP 2L~V 84 2RP5      5205          P/B LENS          SHOULD BE ENGRAVED: 11114/89    M                  141 C02 EQUIP RUN CHG PMP &SIP CS PMP ELEV 84
                                                                                                                      ***
2RP5      5206          P/B LENS          SHOULD BE ENGRAVED: 11/14/89    M            I      142 PIPING PENETRATION EL 78
* 2RP5 2RP5 5207 5208          P/B LENS SHULD BE ~NGRAVED: 11/14/89 AUX FEED PUMP EL 84 LENS IS ENGRAVED:
CONTROL AREA JANITORS 11/14/89 M        I I      143
                                                                                                                              ~44 EQUIPMENT ROOM E. CORRIDOR 2RP5                      P/B LENS          LENS IS ENGRAVED:    11/14/89                      145 CONTROL AREA E. CORRIDOR CEILLING VOID SPACE 5210                            SHOULD BE ENGRAVED: 11/14/89    M        I I        146 SERV WTR PIPE TUNNEL AREA ELEV. 88 2RP5      5217                            SHOULD BE: AUX BLDG 11/14/89    M                  147
                                                                          *21 &22 MONITOR TANKS EL. 64' 2RP5      5218                            SHOULD BE: AUX BLDG 11/14/89    M                  l4S
                                                                          *21 WASTE HOLD-UP
* TK. EL . 64'
 
c~r~:'.:~a'g e>i!fo*}:*'ii~!$7&sect;'.'.<~~j:f:~~~f0:~~~~;'.f~,*:~~~t~~~~::;::~}~\~;**. -:,~.
                                                                                                                              '' ,* ,_  - -~ .. :. - *,.
;:;*:;-0;:
12/26/89
_ SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2
                                  >Z:;~~~:c'"''''                  ..      ..
* SORTED BY PAHEL PHOTO #/ .                  , -.*.;;'J";.' _,_..        ITEM GROUP                                                  DATE              DATE    RECORD VIDEO FRAME COMPONENT?i:;:;;:*';l,~P.ANEL                  NUMBER NUMBER CATEGORY              DESCRIPTION              IDENTIFIED IMPACT FIXED  NUMBER
                  =========== ========;~~g~~~~:=~=;====== ======= ====== =============== ==================== ========== ====== ======== ======
2RP5        5219                                SHOULD BE: AUX BLDB 11/14/89            M    I I    149 122 WASTE HOLD-UP TK. EL. 64' 2RP5        5220                                SHOULD BE: AUX BLDG 11/14/89            M    ! I    150 12 WASTE MONITOR EL.
64' 2RP5        5240                                SHOULD BE: AUX BLDG 11/14/89            M            151 WEST ISLE 2 EL. 64' 2RP5        5239                                SHOULD BE: AUX BLDG 11/14/89            M            152 EAST AISLE 2 EL. 64' 2RP5        5227                                SHOULD BE: AUX BLDG 11/14/89            M    I 7;    153 ELEV 100 COL 14-15.2
* FF-LL 2RP5        5282                                SHOULD BE: AUX BLDG 11/14/89            M            154 CHG PUMPS EL. 84' 2RP5        5309                                SHOULD BE: NO. 21, 11/14/89              M            155 22 &23 AUX FEED PUMPS EL. 84 2RP5        5316                                SHOULD BE: NO. 21 11/14/89              M    I I    156 DIESEL F.O. STORAGE TANK EL. 14-BACK-UP
                                  ., . *.~
SHOULD BE: NO. 22 11/14/89              M    I I    157 .
DIESEL F.O. STORAGE TANK EL. 84 BACK-UP SHOULD BE: AUX.
* 11/14/89        M        I    158 BLDG #2 LTDN/SEAL WTR. HX ENTRY EL.
84'
                                                            .. 2RP5        5341                                SHOULD BE: AUX.          11/14/89      M    I I      159 BLDG WEST AISLE 2 EL. 84 I
* 2RP5          5340                              SHOULD BE: AUX ]LOG 11/14/89 EAST AISLE 2 EL. 84' M    I I      160
 
Page No. 18 12/26/89
_ SALEM SIMULATOR
                                                .STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT    ,*    ,,_'
PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE    RECORD IDENTIFIED IMPACT FIXED NUMBER
  =========== =============== ========== ======= ====== =============== ==================== ========== ====== ======== ======
2RP5              5334                          SHOULD BE: MAINT *i 11/14/89    M        I I    . 161 TEST EQUIP ROOM EL.
122 BB15.7 2RP5              5324                          SHOULD BE: AUX BLDG 11/14/89    M                  162 CORRIDOR AREA EL.
100' 2RP5              5356                            SHOULD BE: RELAY    11/14/89  M                  163 ROOM 2RP5              5368                            SHOULD BE:          11/14/89  M                  164 C02/HALON DISCHARGE 2RP5-                                            MISSING: CODE        11/14/89  M        I l      165 AUDIBLE ALARMS                              -~
                                                                                                                                        ,.
PLAKARD ON THE RIGHT                        ~
SIDE OF FIRE &SMOKE
* DETECTION BLACK 2RP5                                            MISSING: LAMP TEST 11/14/89      M        I I      16 5 SWITCHES ON THE LEFT OF FIRE &SMOKE DETECTION BLACK 110 SWITCHES)
KA-8 5Si                    2RP5              5903          RECORDERS        POSITIONED LOWER ON 10/31/89    s                  40 2RP5 AT THE STATION R2 ?/B SWITHCES 2RP5                                        R2 P/B SWITCHES 10 LAMP TEST          10/31/89  M                  38 .
                        -  , ..    -,
SWITCHES ON THE LEFT OF SMOKE AND FIRE
                                                          . '
DETECTION BLOCK MISSING AT SIMULATOR
                                  *,,  ~
                                                  .,,. . 5705
                                                *~;*~**.~*
                                                ;-*_                    PLAKARDS        TABLE PLAKARDS UNDER 10/31/89            I I        39 5706                          SECONDARY FEEDWATER TEMPERATURE SELECTOR SWITCHES ARE MISSING AT STATION
* XA-3361, 3362              2RP5                            RECORDERS        TIGRAPH RECORDERS AT 10/28/89    s        I I        36 STATION* INDICATORS &
* PUSHBUTTONS AT SIMULATOR
 
~JJ'':%i;I:~f<':'~:;~;~t~~l~!k:~~&#xa3;t~~0;fi'f~-~r,:~;~~~E~'~if;"5f/i"--;&sect;l:~~,2~f<~'j:~\;:st::fiJ1!i!J~~t~*::**~?;_*:',_~:,0:;:
* 12/26/89
                                                                                ~    SALEM SIMULATOR STATION vs SIMUtATOR    ~ARDWARE DIFFERENCES  DATABASE UNIT 2 SORTED BY PANEL
* PHOTO #I VIDEO FRAME COMPONENT<*.''fr""1: ..:
ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE  RECORD IDENTIFIED IMPACT PIXED NUMBER
          =========== ===============*========== ======= ====== =============== ==================== ========== ====== ======== ======
2RP6                            LABELS            IN SECTION 121 AND    10/31/89  s        I I    44 22 STATION POWER TRANSFORMERS) ALL LABELS:
1, 2, 11, 12, 21, 22 ARE 1 SPT, 2 SPT, ETC AT STATION 2RP6                            LABELS            IN (13KV BUS)        10/31/89  s        I I    45 SECTION PART OF MIMIC LINE IS MISSING AT STATION ALSO LABEL:
13 KV BUS ABOVE:
BREAKE FAILURE MULTI-TRIPS IS MISSING AT
* SIMULATOR 2RP5                                              FIRE EXT1NGUI SHER    11103/89  N                105 MISSING FROM THE RIGHT LOWER CORNER OF 2RP6 PANEL 5101,6105,5106 2RP6                                        INDICATORS        CASING.OF INDICATORS 10/31/89    N        I I    42 IS PAINTED WHITE AT.
STATION 6102,6103                2RP6                            INDICATORS        CASING WHITE AT THE 10/31/89    N                43
                                          *.    **-::.
STATION "c    ::.
* 6401  ro. ~ ,,e;~'<F'~f6'              ,_c-INDICATOR        INDICATOR FRAME IS    10131/89  N                4'
                                                                                                                                                        .0 6412                            <~,.
PAINTED WHITE LABELS            LABELS ON EACH        10/31/89  M INDICATOR MISSING AT SIMULATOR 2RP7                            LABELS            GENERATOR LABEL MID 11/02/89    s        I I    85 POSITION &ABOVE XA-3975 AND XA-3976
* IS MISSING AND SO IS MISSING LABEL:
 
':*~';(!~~!'* -*~,;*a~:,;N~~~::'f:i;r:J-"''i:~ '.~\*ct*Jc:~t:~~'.iZ~ff~i~~~j~i~~1~~f~8:\:,;,,~;;""'"?.:~::: *:'- '''{~'~'?o:~o!t?~'.'~*: .
12/26/89
                                                                                        ~    SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT '.._ PANEL      _,-,;.-
ITEM GROUP NUMBER NUMBER CATEGORY            DESCRIPTION
                =========== =============== ========== ======= ====== =============== ==================== ========== ====== ==~===== ======
KILOVOLTS; ABOVE DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER XA-3975 AND:
KILOAMPERS ABOVE XA-3976 2RP7                        LABEL                LABEL: XA-0834              11/02/89  ,,                86 MISSING FROM THE                      "
DOOR OF THE RECORDER ITEM 7103 2RP7                        LABEL                LABEL SA-0884              11/02/89                      87 MISSING FROM THE DOOR OF THE RECORDER ITEM 7104 2RP7                        LABEL                ITEM 7105 MISSING 11/02/89            M                  88 LARGE LABEL ABOVE IT: VIBRATION
* ECCENTRICITY AND CASING DIFFERENTIAL EXPANSION; ALSO MISSING LABEL XZ-0883 2RP7                        RECORDER            MAIN GENERATOR GAS          11103/89  L            I    89 MONITORING SYSTEM LABEL AND RECORDER AND P/B PANELS ARE MISSING FROM 2RP7 2RP7                        RECORDER            MISSING LARGE LABEL 11/03/89            M        I I      90
                                                                    . ~
                                                                        '*-  .,,
                                                                            -~.                              ON TOP PORTION OF THE DOOR: GENERATOR STATOR WATER CONDUCTIVITY; ALOS MISSING KA-1952; ALSO MISSING PTS PLACKARD 2RP7                        RECORDER            ITEM 7107 IS AN L&N 11/03/89            N        I I      91 RECORDER AT THE STATION 2RP7                        ALARM PANELS        ITEM 7500, 7600,            11103;09    H        I I      92 .
* 7700 HAVE NO ALARM PLACKARD AFFIXED TO
 
  - - -- -- . - .. ... ,*~:?-;_ ~~--.:~;:..-: *:.-s:. "- *.... ~/* : :- ..~ 7
            ~
::;-.. -*':' .::~ :: _'_ '~-~. -                -..    ' ....            -- -._ *-- .
                                                .. -~~ =-~  .\:                                    -.
                                                                                                                                              .-.._ ~
Page N'o.          21 12/26/89
                                                                                                              ~  SALEM SIMULATOR STATION' vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2
                                            .**:          -...                                                  SORTED BY PANEL
*
                                      *;_, '.:".  -  i -        -~ ---
* PHOTO #/                                                                              ITEM GROUP                                                    DATE              DATE    RECORD VIDEO FRAME COMPONENT---; ' . PKNEL                                                  NUMBER NUMBER CATEGORY                    DESCRIPTION          IDENTIFIED IMPACT FIXED NUMBER
  =========== ===============* ========== ======= ====== =============== ==================== ========== ====== ======== ======
THE FRONT OF INSTRUMENT AT THE STATION.
2RP7                                        ALARM PANELS      ITEM 7800 IS A      11/03/89    L      I I      93 DIFFERENT STYLE PANEL WITH ONLY FOUR INDICATOR LAMPS HAS ALARGE LABEL 2RP7                                        ALARM PANEL      ITEM 7900 IS PLUGED 11103/89      L                94 UP BLANK 2RP7                                          ALARM PANEL      ITEM 7AOO HAS TWO 11/03/39                        95 RED LABELS: 427 MILS AND 1010 MILS; AT SIMULATOR
                                                                                                                                                                              .,
2RP7                                          LABEL            SALEM 2 RECORDER    11/03/89    M      I        96
* TA-0885 HAS LARGE LABEL: TURBINE CONTROLLED START-UP TEMPERATURE (xF)
ALSO MISSING AT SIMULATOR LABEL TA-0885 2RP7                                          LABEL            2RP7: LABEL MISSING 11/03/89                      97 UPPER RIGHT CORNER 2RP8                                          P/B PANEL        P/B (INCORE T/C      11/03/89    S                98 TREND) AND (TW TURB TREND) SHOULD BE RED P/B PANEL        YELLOW P/B's        11/03/89            I I      99 FOLLOWING YSHOULD BE BLACK RECORDER          ITEM 9101 IS L&N    11/03/89    N              100 RECORDER AT STATION 2RP9                                          LABEL            LABEL: CONTROL ROOM 11/03/89      N              101 DOORS; MISSING ABOVE CONTROL ROOM ACCESS
* CONTROL ROOM DOORS P/B's
 
                                . - .::: .
Page No.      22 12/26/89
                                                              ~SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 2 SORTED BY PANEL
**Dai\mi\
    .L !1\Jl IJ
                ~I tf"/                          ITEM GROUP                                          DATE              DATE  RECORD VIDEO ?RAHE COMPONENT        PANEL        NUMBER NUMBER CATEGORY          DESCRI?TION        ~DENTIFIED IMPACT FIXED NUMBER
    =========== =============== ========== ======= ====== =============== ==================== ========== ====== ======== ======
TONE GENERATOR SONALART ALARM        L/C3/3S    N              102 ELEMENT MISSING
*
* Page No. 1 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER llUMBER CATEGORY        DESCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER
  =========== =============== ========== ======= ====== =============== =================== ========== ====== ======== ======
2M: BLANK            11/29/89            I      232 3L READS: LIFT COIL 11/29/89              I I    233 DISC - 2A4 4M READS: LIFT COIL 11/29/89                      234 DISC - 1SA4 7L READS: LIFT COIL 11/29/89                      235 DISC - 2SA4 BM READS: LIFT COIL 11/29/89                      236 DISC - 1B2 12M READS: LIFT      11/29/89            I        237 COIL DISC - 1SA3 13L READS: T32;      11/29/89                I    238
* LIFT COIL DISC - 1A3 14M: BLANK          11/29/89                    239 13N READS: T45;      11/29/89            I        240 LIFT COIL DISC - 1C3 12P: BLANK          11/29/89                    241 llN READS: LIFT      11/29/89                    242 COIL DISC - 2A3 lOP READS: LIFT      11/29/89            I        243 COIL DISC - 2D3 9N READS: LIFT COIL 11/29/89                I    244 DISC - 2SB3 BP READS: LIFT COIL 11/29/89                      245 DISC - 1SC4 SN READS: LIFT COIL 11/29/89                      246 DISC - 1A4 4P READS: T48        11/29/89                    247
* 3N READS: LIFT COIL 11/29/89 DISC - 1C4 248
 
Page No.
12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION
  =========== =============== ========== ======= ====== =============== ===================
DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER lCCl      A005    1-9  LABEL            LOWER LABEL READS:  12/02/89                I    282 RC12-6 lCCl      A506    1-14  R2 SECTION      NO R2 STATION      12/02/89            I I    283 COVERED WITH BLANK PLATE 1CC1      A903    1-18  LABEL            BOTTOM LABEL READS: 12/04/89                    289 RC13-6 lCCl      A903    1-18  LABEL            TOP LABEL READS: 11 12/04/89                    290 1C-4KV lCCl      A905    1-18  LABELS          TOP LABEL READS: 12 12/04/89                    291 1C-4KV BOTTOM LABEL READS:
RC13-5
* lCCl      A909    1-18  LABELS          TOP LABEL READS: 15 12/04/89                    292 1A-4KV lCCl      A909    1-18  LABEL            BOTTOM LABEL READS: 12/04/89                    293 RCll-6 lCCl      A911    1-18  LABELS          BOTTOM LABEL READS: 12/04/89            I I    294 RCll-5 TOP LABEL READS: 16 1A-4KV lCCl      A912    1-18  LABELS          BOTTOM LABEL READS: 12/04/89                    295 RC16-5 lCCl      A913    1-18  LABEL            BOTTOM LABEL READS: 12/04/89                    296 RC16-7 lCCl      A915    1-18  LABEL            BOTTOM LABEL READS: 12/04/89                    297 RC14-7 lCCl      A916    1-18  LABEL            BOTTOM LABEL READS: 12/04/89                    298 RClH lCCl      AA04    1-15  R2 P/B LENS      AP/B IS BLANK      12/04/89                    299
* lCCl      AA05    1-15  R2 P/B LENS      AP/B IS BLANK      12/04/89                    300
 
                        --------------------------                                                    ----------
Page No.
12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER
  =========== =============== ========== ======= ====== =============== =================== ========== ====== ======== ======
lCCl      AA20    1-15  SCALE            SCALE IS 0 - 75      12/04/89            I I    301 MULTIPLIER LABEL IS:
GPM XlOO lCCl      AA21    1-15  SCALE            BOTTOM LABEL READS: 12/04/89                I    302 RCll -3 lCCl      A706    1-16  R2 STATION        THIS POSITION        12/04/89            I        303 COVERED WITH BLANK lCCl      A807    1-17  RY STATION        THIS POSITION        12/04/89                    304 COVERED WITH BLANK lCCl      AK06    2-6    LABEL            TOP LABEL READS:    12/04/89                    305 1G-460V; 1E-4KV lCCl      AL06    2-7    LABEL            TOP LABEL READS:    12/04/89                    306 1E-460V; 1F-4KV
* lCCl lCCl AM04,05 2-8 AN03    2-9 LABELS LABEL TOP LABELS MISSING (SIMULATOR) 12/04/89 BOTTOM LABEL READS: 12/04/89 A-VIB I        307 308 lCCl      AJOl,06 2-5    LABELS          TOP LABELS MISSING    12/04/89                    309 (SIMULATOR)
RC 21-3        lCCl      A621    1-19  R2 P/B            L PUSHBUTTON IS      12/02/89                    287 BLANK RC12-7          lCCl      A614    1-19  R2 STATION        R2 STATION IN PLACE 12/02/89            I        286 TOP LABEL: 12CCHX ALARM &FLOW BOTTOM LABEL: RC 12-7 RC22-3          lCCl      A662    1-19  R2 P/B          L PUSHBUTTON IS      12/02/89            I I      288 BLANK TI-602A        lCCl      A612    1-19  RY STATION      RY STATION IN PLACE 12/02/89                      284 SINGLE INDICATOR
* TI-602A        lCCl      A613    1-19  RY STATION      TOP LABEL READS: 12 12/02/89                      285 TEMP
 
Page No.
12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL PHOTO #/                        ITEM GROUP                                          DATE              DATE  RECORD VIDEO FRAME COMPONENT PANEL      NUMBER NUMBER CATEGORY          DESCRIPTION          IDENTIFIED IMPACT FIXED  NUMBER LOWER LABEL READS:
B-VIB TI-602B 1CC2      8144,45 3-20  P/B ASSEMBLIES THESE ITEMS ARE NOT 12/04/89                I I    310 54,55,                        ENGRAVED THEY ARE 56                              BLANK 1CC2      8201    3-14  LABELS          TOP LABEL READS:    12/04/89                    311 1PR6, lPRl 1CC2      B202    3-14  LABEL            TOP LABEL READS:    12/04/89                    312 1PR7, 1PR2 lCC2                3-17  PLACKARD        D/T FEEDS: PLACKARD 12/04/89              I      313 IN PLACE NEXT TO ITEM 8221 lCC2              3-18  PLACKARD        TAVE FEEDS: PLACKARD 12/04/89            I I    314 IN PLACE NEXT TO
* ITEM B307 lCC2      B412    4-11  R2 P/B LENS      P PUSHBUTTON LENS    12/04/89            I I    315 READS: /\ FLUS CHANNEL 1 1CC2      8413    4-11  R2 P/B LENS      P PUSHBUTTON LENS    12/04/89            I I    316 READS: /\ FLUX CHANNEL III 1CC2      B415    4-11  R2 P/B LENS      P PUSHBUTTON LENS    12/04/89            I I    317 READS: /\ FLUX CHANNEL II 1CC2      8416    4-11  R2 P/B LENS      P PUSHBUTTON LENS    12/04/89            I I    318 READS: /\ FLUX CHANNEL IV 1CC2      B426    4-14  RY SCALE        LEFT SCALE IS 0 - 12/04/89                I I    319 30; RIGHT SCALE IS 0
                                                                  - 20 lCC2      B522    4-15  LABEL            TOP LABEL:          12/06/89            I I    320 EMERGENCY 250V IS BLACK ON WHITE
* lCC2      B526    4-15  LABEL            BOTTOM LABEL READS: 12/06/89              I I    321 D-VIB: SA-2270;
 
Page No.
12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO *I VIDEO FRAME COMPONENT PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION F1500K DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER lCC2      B526    4-15  RY SCALES        BOTH RIGHT AND LEFT 12/06/89                    322 SCALES ARE 0 - 80 1CC2      8527    4-15  RY SCALE        RIGHT SCALE IS 0 -  12/06/89                    323 10 1CC2        B531    4-20  RY SCALES        RIGHT INDICATOR & 12/06/89                I I    324 SCALE EXISTS AND IS 0 - 24 lCC2      B531    4-20  LABEL            TOP LABEL READS: SG 12/06/89              I I    325 INLET PRESS; FW SG DIP DIFF PRESS 1CC2      8531    4-20  LABEL            BOTTOM LABEL READS: 12/06/89                    326
* D-VIB; P1508 PA4932 I
1CC2      8532    4-20  LABELS          BOTTOM LABEL READS: 12/06/89                    327 D-VIB; P1509, PA5099 1CC2      8541    4-18  RY SCALE        LEFT SCALE IS 0 - 10 12/06/89                    328 1CC2      8546    4-18  RY SCALE        LEFT SCALE IS 0 -32 12/06/89                    329 1CC2      8549    4-18  RY SCALE        RIGHT SCALE DOES NOT 12/06/89                    330 EXIST 1CC2      8607    4-13  RY SCALE        LEFT SCALE IS 0 - 60 12/06/89                    331 1CC2      8614    4-16  LABEL            TOP LABEL: EMERGENCY 12/06/89                    332 250 V IS BLACK ON WHITE 1CC2      8618    4-16  LABEL            BOTTOM LABEL READS: 12/06/89              I I    333 D-VIB; SA5106  I Fl 50OM lCC2      B618    4-16  SCALES          LEFT AND RIGHT      12/06/89                    334 SCALES ARE 0 - 80
* lCC2      B619    4-16  RY SCALE        RIGHT SCALE IS 0 -  12/06/89                    335 10
 
Page No.
12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PAllEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE
  =========== =============== ========== ======= ====== =============== =================== ---------- ------
DATE IDEllTIFIED IMPACT FIXED
                                                                                                            ------ --------
RECORD NUMBER
                                                                                                                  -------- ------
                                                                                                                            ------
lCC2        B619    H6    LABEL            BOTTOM LABEL READS: 12/06/89              I I      336 22 MAC: PA5108, FA598 lRPl                                        LAYOUT, ARRANGEMEllT 11/19/89              I I      167 AND TYPE OF INSTRUMENTS ON lRPl IS RADICALLY DIFFEREllT THAN THAT OF SALEM 2, THEREFORE ITS DIFFERENCES CANNOT BE ACCURATELY DESCRIBED Ill THIS LIST. REFER TO PLANT DRAWING OF THIS PANEL.
* 1RP2        21B            CMC SW WINDOW    CMC 2 POSITION      11/19/89            I I      173 ENGRAV            MAINTAIN: STOP I START, NO. 11 PIPE GALLERY CIRCULATING FAN.
TOP LABELl 77 1RP2        2114          CMC SW WINDOW    CMC 2 POSITION      11/19/89            I I      174 ENGRAV            MAillTAIN: STOP I START, NO. 12 PIPE GALLERY CIRCULATING FAil TOP LABEL: 12 1RP2        2113,14        LABEL            LABEL OVER BOTH      11/19/89            I I      175 SWITCHES READS:
PIPE GALLERY CIRCULATING FANS 1RP2        2116,17        CMC SW WlllDOW    CMC 2 POSITION SRC  11/19/89            I I      176 EllGRAV          SWITCH: AUTO I START STOP - GREEN 1RP2        2203,04        CMC P/B          SWITCHES ARE 2      11/27/89            I        177 SWITCHES          POSITIOll MAINTAIN
* 1RP2        2210          CMC SWITHCES      SWITCH IS 2 POSITION 11/19/89                      178 SRC WITH 4 WINDOWS
 
I I  Page No. 7 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION
    =========== =============== ========== ======= ====== =============== ===================
DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER 1RP2      2211          CMC SWITCHES    SWITCH IS 2 POSITION 11/27/89            I I    179  I MAINTAIN WITH 4                                      *1 WINDOWS I
1RP2      2224          CMC SWITCH      SWITCH IS 2 POSITION 11/27/89            I      180 SRC WITH 4 WINDOWS 1RP2      2221          LABEL            TOP LABEL READS:    11/27 /89            I      181 1CH30 1RP2      2222          LABEL            TOP LABEL READS:    11/27/89            I      182 1CH151 1RP2      2302          LABEL            RIGHT HAND LABEL    11/27/89                    183 READS: DISCHARGE LOUVER 1RP2      2317          LABEL            RIGHT HAND LABEL    11/27/89            I I    184
* READS: OUTSIDE AIR INTAKE 1RP2                      KEY SWITCH      CONTAINMENT          11/27/89            I I    185 EVACUATION HORN BLOCK OPERATE KEY SWITCH AND LABEL ABOVE EXIST BELOW ITEM 2406 1RP2      2407 -        SWITCHES  &      THE ORDER IN WHICH  11/29/89            I I    186 2410          LABELS          THESE ITEMS ARE INSTALLED IS FROM LEFT TO RIGHT:
2RC40 2RC43, I
2RC41, 2RC42 HA-3280,KA-3277 1RP2      2501 -        RECORDERS                            11/19/89            I      169 TO KA-3279                2504 KA-3277        1RP2                      RECORDERS I      SCALE IS 0 - 1.0    11/19/89                    170 SCALES          POINT DESCRIPTION PLACKARD IS DIFFERENT KA-3278        1RP2                      POINT PLACKARD TEMPERATURE FOR ALL 11/19/89              I I    171
* 4 POINTS IS 25xC
[250xc ON SIMULATOR)
 
Page No.
12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #I VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY
  ----------- --------------- ---------- ------- ------
                                        ------- ------ ---------------
DESCRIPTION
                                                                          -------------------
DATE
                                                                                              ---------- ------
DATE IDENTIFIED IMPACT FIXED
                                                                                                          ------ --------
RECORD NUMBER
                                                                                                                -------- ------
                                                                                                                          ------
KA-3279        1RP2      2504          POINT PLACKARD POINT DESCRIPTION      11/19/89            I I      172 PLACKARD IS DIFFERENT XA-8493        1RP2                      RECORDER          THIS RECORDER EXISTS 11/19/89            I I      168 ON 1RP2 1RP3      3505 -        SWITCHES          ORDER OF SWITCHES    11/29/89            I I      187 3507                            FROM LEFT TO RIGHT IS: 11 13 1RP3                      KEYBOARD          SPDS KEYBOARD IS    11/29/89                      188 DRAWER TYPE 1RP3                      LABEL            LABEL BELOW (REACTOR 11/29/89                      189 CORE) LABEL READS:
270x GAMMAMETRICS
* CHANN EL C XA6560 1RP3                      LABEL            LABEL BELOW REACTOR 11/29/89            I I      190 CORE READS: 90x GAMMAMETRICS CHANNEL DXA6561 1RP3      3605          CORE MAP          9A- IS BLANK        11/29/89                      191 INDICATORS 1RP3      3607          CORE MAP          llA IS BLANK        11/29/89                      192 INDICATORS 1RP3      3617          CORE MAP          12B IS BLANK        11/29/89                      193 INDICATORS 1RP3      3615          CORE MAP          lOB READS: LIFT      11/29/89                      194 INDICATORS        COIL DISC - 1D2 1RP3      3613          CORE MAP          8B READS: T35; LIFT 11/19/89                      195 INDICATORS        COIL DISC - 1SC2 1RP3      3611          CORE MAP          6B READS: T39; LIFT 11/29/89                      196 INDICATORS        COIL DISC - 2Dl
* 1RP3      3609          CORE MAP          4B BLANK            11/29/89                      197 INDICATORS
 
Page No. 9 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #I VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY
  =========== =============== ========== ======= ======
DESCRIPTION
                                                        =============== ===================
DATE              DATE IDENTIFIED IMPACT FIXED RECORD llUMBER 1RP3      3620          CORE MAP        3C READS: LIFT COIL 11/29/89                      198 INDICATORS      DISC - lCl 1RP3      3632          CORE MAP        2D BLANK            11/29/89                      199 INDICATORS 1RP3      3622          CORE MAP        5C READS: T33; LIFT 11/29/89                      200 INDICATORS      COIL DISC - 2Al 1RP3      3634          CORE MAP        4D READS: LIFT COIL 11/29/89                      201 INDICATORS      DISC - lSAl 1RP3      3624          CORE MAP        7C READS: T28; LIFT 11/29/89                      202 INDICATORS      COIL DISC - 2SB1 1RP3                      CORE MAP        6D READS: LIFT COIL 11/29/89                      203 INDICATORS      DISC
* 1RP3 1RP3 CORE MAP INDICATORS CORE MAP INDICATORS 8D READS: T15; LIFT 11/29/89 COIL DISC - lBl llC READS: LIFT COIL DISC - 1A2 11/19/89                I 204 205 1RP3                      CORE MAP        lOD READS: T23;      11/29/89                I    206 INDICATORS      LIFT COIL DISC TO VID 1RP3                      CORE MAP        13C READS: LIFT      11/29/89            I        207 INDICATORS      COIL DISC - 1C2 1RP3                      CORE MAP        12D READS: T31;      11/29/89                      208 INDICATORS      LIFT COIL DISC -
1SA2 1RP3                      CORE MAP        14D READS: T49      11/29/89                I    209 INDICATORS 1RP3                      CORE MAP        14F READS: T40;      11/29/89                      210 INDICATORS      LIFT COIL DISC - 2D2 1RP3                      CORE MAP        13E READS: LIFT      11/29/89                      211 INDICATORS      COIL DISC - 2A2
* 1RP3                      CORE MAP        lOF READS: LIFT      11/29/89                I    212
 
Page No. 10 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO V VIDEO FRAME COMPONENT PANEL ITEt1 GROUP NUMBER NUMBER CATEGORY INDICATORS DESCRIPTION COIL DISC - 1SD2 DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER 1RP3                      CORE MAP        9E READS: T12; LIFT 11/29/89                  213 INDICATORS      COIL DISC - 2SA2 1RP3                      CORE MAP        SF READS: T5; LIFT 11/29/89                    214 INDICATORS      COIL DISC - 2D2 1RP3                      CORE MAP        6F READS: LIFT COIL 11/29/89                  215 INDICATORS      DISC - lSDl 1RP3                      CORE MAP        3E READS: LIFT COIL 11/29/89            I    216 INDICATORS      DISC - lSCl 1RP3                      CORE MAP        2H READS: T34; LIFT 11/29/89                  217 INDICATORS      COIL DISC - lSCl 1RP3                      CORE MAP        4H READS: T14; LIFT 11/29/89                  218
* INDICATORS      COIL DISC - 2Bl 1RP3                      CORE MAP        5G READS: Tll; LIFT 11/29/89                  219 INDICATORS      COIL DISC - 2SA1 1RP3                      CORE MAP        6H READS: T4; LIFT 11/29/89                    220 INDICATORS      COIL DISC - 2Cl 1RP3                      CORE MAP        lOH READS: LIFT    11/29/89                  221 INDICATORS      COIL DISC - 2C3 1RP3                      CORE MAP        12H READS: LIFT    11/29/89                  222 INDICATORS      COIL DISC - 2B2 1RP3                      CORE MAP        13G READS: LIFT    11/29/89                  223 INDICATORS      COIL DISC - 2SB2 1RP3                      CORE MAP        14H READS: LIFT    11/29/89                  224 INDICATORS      COIL DISC - 1SC3 1RP3                      CORE MAP        llJ READS: LIFT    11/29/89                  225 INDICATORS      COIL DISC - 2SA3 1RP3                      CORE MAP        12K READS: T22;    11/29/89                  226 INDICATORS      LIFT COIL DISC
* 1RP3                      CORE MAP        lOK READS: LIFT    11/29/89                  227 INDICATORS      COIL DISC - 2BC
 
Page No. 11 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER
  =========== =============== ========== ======= ====== =============== =================== ========== ====== ======== ======
1RP3                      CORE MAP        8K READS: LIFT COIL 11/29/89                      228 INDICATORS      DISC - 2C4 1RP3                      CORE MAP        6K READS: T8; LIFT 11/29/89                      229 INDICATORS      COIL DISC - 1SD4 1RP3                      CORE MAP        3J READS: LIFT COIL 11/29/89                      230 INDICATORS      DISC - 2SB4 1RP3                      CORE MAP        2K READS: T38; LIFT 11/29/89                I    231 INDICATORS      COIL DISC 2D4 1RP4        4611          P/B SWITCH      LENS READS: 15      11/29/89                    249 SERVICE WATER PUKP 1RP4        4612          P/B SWITCH      LENS READS: 16      11/29/89                    250 SERVICE WATER PUMP 1RP4        4631          P/B SWITCH      LENS READS: 25      11/29/89                    251
* 1RP4 1RP4 4633 4106 P/B SWITCH P/B SWITCH SERVICE WATER PUMP LENS READS: 25 SERVICE WATER PUMP LENS READS: 15 11/29/89 11/29/89 252 253 SERVICE WATER PUMP 1RP4        4107          P/B SWITCH      LENS READS: 16      11/29/89                    254 SERVICE WATER PUMP 1RP4        4728          P/B SWITCH      LENS READS: 11      11/29/89                    255 SERVICE WATER PUMP 1RP4        4129          P/B SWITCH      LENS READS: 12      11/29/89                    256 SERVICE WATER PUMP 1RP4                      P/B SWITCH      6 R2 P/B SWITCH      11/29/89                    257 EXIST DIRECTLY UNDER ITEMS 4C01, 4C02, 4C03, 4C04, 4C05, 4C06 1RP4        4H01          CMC SWITCH      LENS READS: OFF I 11/29/89                I I    258 ON - POWER SUPPLY A
* LOCA SAMPL ISOL VAS
 
-          --- -
Page No. 12 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED
    =========== =============== ========== ======= ====== =============== =================== ---------- ------
                                                                                                          ------ --------
RECORD NUMBER
                                                                                                                  -------- ------
                                                                                                                          ------
1RP4      4Hl8          CMC SWITCH      LENS READS: OFF I 11/29/89                I I      259 ON - POWER SUPPLY C LOCA SAMPL ISOL VAS 11SJ4 4        1RP4                      CMC SWITCH      EXIST ON THE LEFT OF 11/29/89                      260 ITEN 4D04 12SJ44        1RP4                      CMC SWITCH      EXISTS ON THE LEFT  11/29/89                      261 OF ITEM 4D07                                          I I
LA-3977        1RP4                      LABEL            LABEL MISSING        11/29/89                      262 I LA-3977                                                I I
LA-397 8      1RP4                      LABEL                                11/29/89                      263 I LA-8639        1RP4                      RECORDER        RECORDER EXISTS      11/29/89                      264 UNDER THE LABEL OF:
* TIDE LEVEL 1RP5                      CMC SWITCH      THESE 2 POSITIONS    11/29/89            I I      265 MAINTAIN CMC SWITCHES UNDER LABELS OF: A, B, C, NORMAL I EMERG -
POWER AVAIL AND UNDER LARGE LABEL:
DIESEL GENERATOR EXHAUST FANS EMERG BYPASS OF C02 SHUTDOWN ARE MISSING ON 1RP5 1RP5      5701,02        LABEL            LABEL ABOVE THESE    11/29/89            I I      268 INDICATORS READ:
STEAM GENERATOR METAL TEMPERATURE 1RP5      5705,06        LABEL            LABEL ABOVE THESE    11/29/89            I I      269 SELECTORS READ:
STEAM GENERATOR TEMPERATURE SELECT 1RP5      5705 06 f        LABELS          POSITION LABELS      11/29/89            I I      270
* ABOVE THESE SELECTORS ARE
 
Page No. 13 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION SWAPPED AT THE DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER STATION 1RP5      5901          LABEL            LABEL ON THE LOWER  11/29/89            I I    271 MID SECTION OF RECORDER XA-6846 1RP5      5902          LABEL            LABEL ON THE LOWER  11/29/89            I I    272 AID SECTION OF RECODER XA-8550 1RP5      5903          LABEL            LABEL ON THE LOWER  11/29/89            I I    273 MID SECTION OF RECORDER XA-8551 XA-3361  1RP5        5500          RECORDERS        XA-3361 CONTAINMENT 11/29/89              I I    2" 00 HYDROGEN CONCENTRATION RECORDER IS A TIGRAPH RECORDER
* XA-3362  1RP5      5600          RECORDER        XA-3362 CONTAINMENT 11/29/89 HYDROGEN CONCENTRATION RECORDER IS A TIGRAPH RECORDER I I    267 1RP6                      ANALOG          4" ROUND INDICATORS 12/02/89                    274 INDICATORS      HAVE WHITE FRAME 1RP6                      MIMIC            NO MIMIC LINE        12/02/89                    275 SEPARATING 11 AND 12 POWER TRANSFORMER BLACK AND 13KV BUS BLACK 1RP6                      LAMP INDICATORS BREAKER FAILURE      12/02/89            I I    27 6 MULTI TRIP LAMP INDICATORS ARE SITUATED AS FOLLOWS:
INDICATOR LABELED SECTION 1-2 MT 86/3-4 IS DIRECTLY BELOW ITEM 6219
* INDICATOR LABELED SECTION 2-3 MT
 
Page No. 14 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE    RECORD IDENTIFIED IMPACT FIXED NUMBER
                                                                                        ========== ====== ======== ======
86/2-3 IS DIRECTLY BELOW ITEM 6220 INDICATOR LABELED SECTION 4-5 MT 86/4-5 IS DIRECTLY BELOW ITEM 6322 1RP6                      PANEL SECTION    (BREAKER 21X/LINE    12/02/89            I I      277 5021) THIS SECTION DOES NOT EXIST AT THE SIMULATOR 1RP6                      PANEL SECTION    (BREAKER llX/LINE 12/02/89                I I      278 5024) THIS SECTION IS VERY SIMILAR TO:
BREAKER 31X/LINE 5037 AT THE SIMULATOR. THE DIFFERENCES ARE:
*
: 1. MAIN TOP LABEL
: 2. LABEL: NEW FREEDOM LINE
: 3. MEGAWATTS INDICATOR SCALE IS 4000-0-4000
: 4. LABEL TO LAMP INDICATOR NEXT TO VOLTMETER SELECTOR SWITCH      NEEDS CARRIER RELAYS
: 5. VOLTMETER SELECTOR SWITCH HAS LABEL: 5024 VOLTMETER
: 6. TOGGLE SWITCH UNDER THE LABEL:
500KV SECT 2-6 BKR RECLOSING 1RP6                      PANEL SWITCH    ALSO LARGER LABEL ON 12/02/89            I I      279 THE RIGHT OF SWITCH:
BS 2-6 BREAKER RECLOSING
: 7. UNDER BUS
* SECTION AMPERES LABEL, THE LEFT
 
Page No. 15 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM
  ----------- --------------- ---------- -------
GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED
                                                ------ --------------- ------------------- ---------- ------
                                        ------- ------                                                    ------ --------
RECORD NUMBER
                                                                                                                  -------- ------
                                                                                                                          ------
SMALL LABEL READS:
BS 2-6; CENTER SMALL LABEL READS:
BS 5-6; RIGHT SMALL LABEL      READS BS 1-5. LABELS PHASE 1, PHASE 2, PHASE 3 ARE ON THE      RIGHT SIDE OF THE INDICATORS
: 8. ITEMS 6427 6429 I
HAVE ALABEL: BS 2-10 BREAKER
: 9. ITEM 6428 HAS A LABEL: BACKUP RELAYS 1RP6                      PANEL SECTION    10 - ITEM 6430 HAS A12/02/89                        280 LABEL REMOTE TRIP
* 1RP6                      PANEL SECTION    3 UNIT GAS TURBINE 12/02/89 GENERATOR DOES EXIST AT SALEM 1 BUT WAS REMOVED FROM SIMULAOR I 1988 I        281 1RP9      9102,03        LABEL            LABEL OVER THESE      11/19/89            I I        81 P/B's IS: CONTROL ROOM DOOR 2CC1                      KEY &TAG        KEY &TAG MISSING:      11/19/89            I I R45 COMPUTER KEYBOARD UNIT 1 2CC1                      KEY &TAG        KEY &TAG MISSING: 11/19/89                I I CONTAINMENT EVACUATION HORN BLOCK RMS CONTROL BLOCK TRIP BKR TEST UNIT 1 1004 2CC1              1-2    LABEL            TOP LABEL IS:          11/19/89            I I CONTAINMENT FAN COIL UNITS
* 2CC1      AD03,07 1-2 11, 15, R2 LENS          LENS IS ENGRAVED (A) 11/19/89 AUTO I I
 
------          ~-----
Page No. 16 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY
    ----------- --------------- ---------- -------
                                          ------- ------
19 DESCRIPTION DATE
                                                  ------ --------------- ------------------- ---------- ------
DATE IDENTIFIED IMPACT FIXED RECORD NUMBER
                                                                                                                  -------- ------
                                                                                                          ------ -------- ------
2CC1      AD15    H      LABEL            LOWER LABEL IS: RC 11/19/89                        10 12 - 7 2CC1      AD19    1-2    LABEL            LOWER LABEL IS: RC 11/19/89                        11 13 - 6 2CC1      AD22    1-2    RY SCALE        RIGHT SCALE IS: -2 11/19/89                        12
                                                                              -1    0 +l
                                                                          +2 2CC1      AD22    1-2    LABEL            TOP LABEL IS: LK    11/19/89            I I      13 DET LEVEL CONT DIFF PRESS 2CC1              1-7    LABEL            TOP LABEL IS:        11/19/89            I I      14 SAFETY INJECTION
* SYSTEM 2CC1      AH13(A) 1-7    R2 LENS          LENS IS BLANK        11/19/89                I      15 AH14(A) 2CC1      AH14    1-7    LABEL            BOTTOM LABEL IS: RC 11/19/89                        16 12-6; RC 12-7 2CC1      AI05    1-8    RY SCALE        LEFT SCALE IS BLANK 11/19/89            I I        17 2CC1      AI06    1-8    RY SCALE        LEFT SCALE IS 0 - 80 11/19/89                      18 2CC1      AI07,08 1-8    R2 STATIONS      R2 STATION LOCATIONS 11/19/89                      19 ARE COVERED WITH BLANK PLATES 2CC1      AI09    1-8    LABEL            LOWER LABEL IS:      11/19/89                      20 B-VIB; LI-1921 2CC1      AilO    1-8    LABEL            LOWER LABEL IS:      11/19/89                      21 D-VIB; LI-920 2CCl      Aill,12 1-8    RY STATIONS      RY STATIONS          11/19/89                      22 LOCATIONS ARE COVERED WITH BLANK PLATES
* 2CC1      APOl    2-2                    ALL LENSES DO NOT    11/19/89            I I        23
 
Page No. 17 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY
      ----------- --------------- ---------- -------
ADHLPT DESCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED
                                                                                                              ------ --------
                                                      ------ --------------- ------------------- ---------- ------
                                              ------- ------
HAVE SG INLET AS A RECORD NUMBER
                                                                                                                      -------- ------
                                                                                                                              ------
PREFIX 2CC1      AP03(T)        R2 LENS          LENS IS ENGRAVED:    11/19/89                      24 PH LO 2CC1      AP03(P) 2-2    R2 LENS          TAPE ACROSS THE LENS 11/19/89                        25 2CC1      AP05 2    R2 STATION      R2 P/B STATION DIST 11/19/89                        26 AP09                            AT THESE LOCATIONS UNDER THE LABELS OF:
1 DM PUMP          2 DM PUMP 1F-460V 2F-460V 3 DM PUMP DM WTR 1F-460V
* AUX PUMP ALARM 1A-460V 2CC1      AP04    2-2    LABEL            TOP LABEL READS: DM 11/19/89                        28 WTR TO CONT 2CC1      AP05 2    LABEL            TOP LABEL OVER THESE 11/19/89                        29 AP07                            R2 STATION READS:
DEMINERALIZED WATER TRANSFER PUMPS 2CC1      AP09 2    LABEL            TOP LABEL OVER THESE 11/19/89              I I      30 APlO                            LOCATIONS READS:
DEMINERALIZED WATER STORAGE TANKS 2CC1      AQ04    2-2    TY STATION      RY STATION IS A2 11/19/89                I I        31 INDICATOR STATION 0
                                                                              - 30 AMP XlO LOWER LABEL IS:
11-MAC LA-5192; LA-5193
* 2CC1      AQ05    2-3    R2 STATION      R2 STATION AT THIS    11/19/89            I I        32 LOCATION UNDER THE I
L_ _ _
 
Page No. i8 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION
  =========== =============== ========== ======= ====== =============== ===================
LABEL: 3 STATION DATE IDENTIFIED IMPACT DATE FIXED RECORD NUMBER AIR COMPRESSOR AND:
1G-4KV 2CC1      AQ06    2-3  RY INDICATOR    RY INDICATOR AT THIS 11/19/89              I I    33 LOCATION UNDER THE LABEL OF: STATION AIR AND: HEADER PRESSURE A B 2CC1      AQ07    2-3  R2 STATION      R2 STATION AT THIS 11/19/89                I I    34 LOCATION UNDER THE LABEL OF: EMER AIR COMPR AllD: 1C-460V 2CC1      AQ08    2-3  RY STATION      RY 2 CHAN. STATION 11/19/89                I I    35 AT THIS LOCATION UNDER THE LABEL OF:
CONTROL AIR HEADER
* PRESSURE B          A 2CC1      ASOl          LABEL            TOP LABEL READS:    11/19/89                      37 GROUP 2 FA-5241 - 5244 2CC1                2-4                    RIGHT HAND SCALE IS: 11/19/89                      36 0 TO 1. 0. ALSO LOWER SQUARE LABEL READS: GR WIDE RANGE (GPM); RD NARROW RANGE (GPM)
LA-5546 &5547 2CC1        APlO    2-2  RY STATIONS      RY STATION EXISTS AT 11/19/89              I I    27 THIS LOCATION UNDER THE LABEL OF:
DEMINERALIZED WATER STORAGE TANKS PA-5511        2CC1      AFOl    1-3  RECORDER        LEFT SCALE SHOULD BE 11/19/89
                                                                        -2 TO 160 PA-5511        2CC1      AFOl    1-3  RECORDER        LOWER LABEL SHOULD 11/19/89 BE PR-948 AAND 1-3 (202071)
* PA-5512        2CC1      AF02    1-4  RECORDER        LEFT SCALE SHOULD BE 11/19/89              I I
                                                                        -2 TO 160. LOWER
 
                                                                                ------------
D""'"
l uyc lT nu,... 19 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER
  =========== =============== ========== ======= ====== =============== =================== ========== ====== ======== ======
LABELS SHOULD BE PR-9488 1-4 (202071)
TA-5489        2CC1      AD04,08 1-2    RY SCALES        SCALE IS 0 - 20      11/19/89            I I 12,16, 20 2CC2                      LABEL            LOWER LABEL OF BORID 11/19/89            I I    38 ACID FLOW COUNTERS READS: FD-5300 2CC2                      LABEL            LOWER LABEL OF      11/19/89            I I    39 PRIMARY WATER FLOW COUNTERS READS:
FD-5301 2CC2                      GRAPH            PRESSURE -          11/19/89            I I    40 TEMPERATURE CURVE GRAPH OVER 3 - 6
* AFFIXED 2CC2      BPOl          LABEL            LABEL ON TOP OF BPOl 11/19/89                    41 READS: GROUP 3 2CC2      BC02    H    LABEL            TOP LABEL SAYS: 1A3 11/H/89                      45 POSIT;    1A4 POSIT 2CC2      BC03    4-2  RY STATION      RY INDICATORS EXISTS 11/19/89                    46 UNDER THE LABEL:
2Al POSIT; 2A2 POSIT 2CC2        BC04    H    LABEL            TOP LABEL SAYS: 2A3 11/19/89                      47 POSIT; 2A4 POSIT 2CC2        BC05    4-2                    BLANK                11/19/89                    48 2CC2      BC06    4-2  LABEL            TOP LABEL READS:    11/19/89            I      49 lBl POSIT; 1B2 POSIT 2CC2        BC07    4-2  LABEL            TOP LABEL READS:    11/19/89            I I    50 2Bl POSIT; 2B2 POSIT
* 2CC2      BKOl - H      LABELS          ALL LABELS BLACK ON 11/19/89              I I    51 BK08                          WHITE LABELS ON THE
 
Page No,    20 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DOOR HANDLE SAYS: 4 DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER
                                                                                              ========== ====== ======== ======
RODS; LABEL ON THE GLASS SAYS: STEPS 2CC2      BLOl          LABEL            TOP LABEL SAYS:      11/19/89                      52 GROUP 4 NUCLEAR POWER 2CC2          BQOl    4-1  LABEL            TOP LABEL SAYS: NIS 11/19/89                        44 RANGE RECORDERS                                            POWER SHUTDOWN COUN- 2CC2        BBOl 6    LABELS          ALL LABELS ON THE 11/19/89                          42 TERS                        BB06                          COUNTERS ARE BLACK ON WHITE. DOOR HANDLE LABEL SAYS: 4 RODS; LABEL ON THE GLASS SAYS: STEPS XA-3269        2CC2        BH02          SCALE            DUAL SCALE 0 - 12; 0 11/19/89                      43
                                                                        - 15
* 2CC3        CKOl    5-1  LABEL            TOP LABEL READS:
11AR25, 1AR19, 11AR14 BOTTOM LABEL READS:
RC 14-4, RC 14-5 11/19/89                      53 2CC3        CKOl -        LABELS &R2      CK02 TOP LABEL: 11 11/19/89              I I      54 CK03          LENS            11AR37 1H-460V I
BOTTOM LABEL RC 14-4 CK03 TOP LABEL: 12 12AR25, 1H-460V BOTTOM LABEL: RC 14-5 CK04 TOP LABEL: 13 13AR25, lF-460 BOTTOM LABEL: RC 16-4, RC 16-5 CK05 TOP LABEL: 14 14AR25, 1F-460V BOTTOM LABEL: RC 16-5
* CK06 BOTTOM LABEL:
RC 17-3, RC 18-6
 
-
P~ge No.    ~1
                ""
12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE  RECORD IDENTIFIED IMPACT FIXED NUMBER
    =========== =============== ========== ======= ====== =============== =================== ========== ====== ======== ======
R2 LENS ENGRAVINGS REFERENCE TOP LABEL NUMBERS 2CC3      CK13,14 5-1    RY IND,R2 P/B    INSTRUMENTS AT THESE 11/19/89            I I    55 SWITCH          LOCATIONS DO NOT EXIST 2CC3      CK12    5-1  RY IND.          SINGLE CHANNEL RY 11/19/89                I I    56 INDICATOR ONLY RIGHT SIDE IS BLANK 2CC3      CKll    H    LABELS          TOP LABEL: 21A      11/19/89                    57 LEVEL, 21B LEVEL 2CC3      CK12    5-1  LABELS          TOP LABEL: 13 LEVEL 11/19/89                      58 BOTTOM LABEL: 11
* MAC; LA-228 2CC3      CNOl          P/B SWITCH      DOES NOT EXIST AT    11/19/89            I I      59 SIMILAR TO SIMULATOR LOCATION 2CC3      CB03          LABEL            LABEL ON TOP OF CB03 11/19/89                    60 SAYS: GROUP 6 2CC3      CP08 (D) 6-22  R2 LENS          R2 LENS ENGRAVED:    11/19/89                    61 CONDENSER VACUUM LO 2CC3      CB04,05 6-2    R2 LENS          ALL REFERENCES TO    11/19/89                    62 DIESEL GENERATOR ON DG IS REPLACED BY lA 2CC3      CDOl,02 6-7    R2 LENS          ALL REFERENCE TO    11/19/89            I I      63 DIESEL GENERATOR ON DG IS REPLACED BY lA 2CC3                6-4  LABEL            TOP LABEL IS:        11/19/89                    64 STATION POWER 2CC3      CB18    6-4  LABEL            TOP LABEL IS: PHASE 11/19/89                      65 SELECT
* 2CC3                6-8  MIMIC            RED MIMIC HAS        11/19/89                    66 DIFFERENCES
 
                                                                              -------------
Page No,    22 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER
  =========== =============== ========== ======= ====== =============== =================== ========== ====== ======== ======
2CC3                      PLACKARD        LOAD DISPATCHER      11/19/89            I I    67 VOLTAGE REQUIREMENTS PLACKARD IS AFFIXED NEXT TO SUPERVISORY LIGHTS 2CC3                6-5  LABEL            TOP LABEL SAYS:      11/19/89                    68 GRID SYNCHRONIZATION 2RP7        7101          LABEL            TOP LABEL IS:        11/19/89                    69 KILOVOLTS BOTTOM LABEL IS:
XA-3975 2RP7        7102          LABEL            TOP LABEL IS:        11/19/89            I I    70 KILOAMPERES BOTTOM LABEL IS:
* XA-3976 2RP7      7101,02        LABELS          LARGE LABEL COVERING 11/19/89            I I    71 BOTH RECORDERS IS:
GENERATOR 2RP7                      METERS          TWO KW INPUT DEMAND 11/19/89              I I    74 METERS INSTALLED BETWEEN XA-0883 AND GENERATOR STATION WATER CONDUCTIVITY TA-0885        2RP7        7B01          LABEL            BOTTOM LABEL IS:    11/19/89                    76 TA-0885 W552 TO W560    2RP7        7200 -                        THESE INSTRUMENTS    11/19/89                    75 7900                            HAVE BEEN CROSSED 7AOO                          OUT BY RED TAPE XA-0883        2RP7      7105          LABEL            TOP LABEL IS: LARGE 11/19/89              I I    73 AND BOLD.
BOTTOM LABEL IS:
XA-0883 XA-0884,SA-0886 2RP7      7103,04        RECORDERS        RECORDERS ARE        11/19/89            I I    72 DIFFERENT MAKE
*
(ESTERLINE ANGUS)
 
                                                                                    ---~--        -        --------
Page No. 23 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY
  ----------- --------------- ---------- -------
DESCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER
                                                ------ --------------- ------------------- ========== ====== ======== ======
                                        ------- ------
2RP8                      P/B ENGRAVING    INCORE T/C TREND AND 11/19/89            I I      77 TW TURB TREND ARE RED IN COLOR 2RP8                      LABEL            LABEL OVER GREEN    11/19/89            I I      78 PUSHBUTTON IS: RCS OVERPRESSURIZATION U2027 :RCL SYSTEM PESS. 1/2 AVG" 2RP8      8818 -        P/B COVERS        THESE P/B's ARE      11/19/89                      79 8823                            YELLOW 2RP8      8177 -        P/B COVERS        THESE P/B's ARE      11/19/89                      80 8179                            BLANK YELLOW ALL PANELS        ALL    CNTRL RM          ALL PLANT EQUIPMENT 11/19/89 INSTRUMENTS      REFERENCE NUMBERS
* BEGIN WITH 1 (AT SALEt1 lSTATIONl OHA        25      A      ANN.              CROSSED OUT BY TAPE 11/19/89                      82 OHA        35      A                        CROSSED OUT BY TAPE 11/19/89                      83 OHA        44      A                        READS: FIRE PROT    11/19/89                      84 WTR FLO IN 1/2 AUX BLDG OHA        38      A                        READS: FIRE PMP 1/2 11/19/89                      85 TRBL OHA        36      A                        READS: ESS CNTRL & 11/19/89                        86 EMER LTG INVRT FAIL OHA        30      A                        READS: FIRE PMP 1/2 11/19/89                I    87 RUN OHA        22      A                        READS: FIRE PROT    11/19/89                      88 WTR PRESS LO OHA        19      B                        READS: RMS CH. TEST 11/19/89                      89
* OHA        43      B                      READS: SEIS RCDR SYS ACT 11/19/89                      90
 
      ---------~---------
Page No. 24 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY
  ----------- --------------- ---------- -------
DESCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER
                                                ------ --------------- ------------------- ========== ====== ======== ======
                                        ------- ------
OHA        44      B                      READS: AUX BOIL    11/19/89                      91 TRBL OHA        36      D                      READSl HTG WTR STM 11/19/89                I    92 SYS TRBL OHA        29                              READS: FRESHWTR    11/19/89                      93 PRE-TREAT TRBL OHA        20      B                      READS: RMS PROCESS 11/19/89                      94 FLTR RADI OHA        21      B                      READS: FRESHWTR    11/19/89                      95 STOR TK 1/2 LVL LO OHA        12      B                      READS: RMS PROCESS 11/19/89                      96 RAD HI
* OHA        13      B                      READS: FRESHWTR SYS 11/19/89                      97 PRESS LO OHA                B                      READS: FRESHWTR SYS 11/19/89                      98 TRBL OHA                B                      READS: FRESHWTR SYS 11/19/89                      99 TRBL OHA        41      c                      CROSSED OUT BY TAPE 11/19/89                I    100 OHA        15      c                      CROSSED OUT BY TAPE 11/19/89                    101 OHA        17      D                      READS: !JON RAD LIQ 11/19/89                    102 WSTE DISP TRBL OHA        26      D                      READS: VTL HT TRACE 11/19/89                    103 TRBL OHA        39      D                      READS: CH. C        11/19/89                    104 DECREASING SHUTDN MARGIN OHA        35      D                      READS: RWST LVL    11/19/89                    105 HI/LO
* OHA        43      D                      READS: RWST/PWST    11/19/89                    106 OVRFLO
 
  ------~----------------
Page No. 25 i2/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY          DESCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER
      =========== =============== ========== ======= ====== =============== =================== ========== ====== ======== ======
OHA        44    D                      READS: RWST LVL LO 11/19/89                      107 LO OHA        46    D                      READS: CH. D        11/19/89                    108 DECREASING SHUTDN MARGIN OHA        36      D                      READS: RWST LVL LO 11/19/89                      109 BU OHA        20      D                      READS: RH2 NOT FULL 11/19/89                    110 CLS &RX PRESS HI OHA        12      D                      READS: RH 1 NOT    11/19/89                    111 FULL CLS &RX PRESS HIGH OHA        41      D                      READS: BIT DISCH    11/19/89                I    112
* PRESS HI OHA        24      D                      READS: ROD DRIVE    11/19/89                    113 FAN VIB HI ALERT OHA        44      E                      READS: BLANK        11/19/89                I    114 OHA        47      E                      READS: SOUTH PENET 11/19/89                      115 AREA AMB TEMP HI OHA        24      E                      READS: 1/3 CW BRG  11/19/89                    116 LUBE PRESS LO/PMP TRIP OHA        39      F                      CROSSED OUT BY TAPE 11/19/89                    117 OHA        43      G                      READS: BULK H2 TRBL 11/19/89                    118 OHA        30      G                      READS: C02 STOR    11/19/89                    119 PRESS HI/LO OHA        40      40                    READS: GAS TURB    11/19/89                    120 TRBL OHA        27      H                      READS: AUX XFMR OIL 11/19/89                    121
* LVL LO/INERT AIR TRBL L_
 
l Page No. 26 i2/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL
  =========== =============== ==========
                                        , ITEM GROUP NUMBER NUMBER CATEGORY
                                          =======
DESCRIPTION
                                                  ====== =============== ===================
DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER OHA          33      H                      READS: MN XFMR 02 11/19/89                        122 OIL LVL LO/MISC TRBL OHA          34      H                      READS: SMOKE IN GEN 11/19/89                      123 OHA          42      H                      READS: MN XFMR      11/19/89                    124 HARMONIC OVERCURRENT OHA          43      H                      READS: AUX XFMR CLG 11/19/89                      125 TRBL OHA          22      H                      READS: BLANK        11/19/89                I    126 OHA          14      H                      READS: 22 STA XFMR 11/19/89                      127 PROT BU OHA          31      H                      READS: ISTA XFMR    11/19/89            I      128 CLG TRBL
* OHA OHA 32 39 H
H READS: COND POL IMMED BYP READS: ISTA XPMR OIL LVL LO/TEMP HI 11/19/89 11/19/89 129 130 OHA          40      H                      READS: COND POL      11/19/89                    131 WSTE RECOV TRBL OHA          32      J                      READS: 13KV BUS      11/19/89                    132 SECT 4 GRND FAULT OHA          14      J                      READS: 13 KV BUS    11/19/89                    133 SECT 1 GRND FAULT OHA          15      J                      READS: 22 STA PWR    11/19/89                    134 XFMR BKR FAIL OHA          16      J                      CROSSED OUT BY TAPE 11/19/89                      135 OHA          23      J                      BLANK                11/19/89                    136 OHA          2      K                      READS: 500 KV BS    11/19/89            I      137 5-6 BKR lOX GRND I FAIL
* OHA          10      K                      READS: 500 KV BS    11/19/89            I I    138
 
Page No. 27 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY
                                        ------- ------
  ----------- --------------- ---------- -------
DESCRIPTION DATE
                                                ------ --------------- ------------------- ---------- ------
DATE    RECORD IDENTIFIED IMPACT FIXED NUMBER
                                                                                                              -------- ------
                                                                                                        ------ -------- ------
5-6 BKR lOX TRBL OHA        11      K                      READS: 500KV BS 1-8 11/19/89                      139 BKR 20X TRBL OHA        18      K                      READS: 500KV BS 2-6 11/19/89                      140 BKR llX GRND I FAIL OHA        19      K                      READS: 500 KV BS    11/19/89              I      141 2-8 BKR 21X GRND /
FAIL OHA        26      K                      READS: 500 KV BS    11/19/89                      142 2-6 BKR llX TRBL OHA        27      K                      READS: 50 KV BS 2-8 11/19/89                      143 BKR 21X TRBL OHA        34      K                      READS: 500 KV BS    11/19/89              I      144
* 1-5 BKR 12X GRND I FAIL OHA        35      K                      READS: BS 1-5/5-6 11/19/89              I        145 500KV BKR FLASHOVER OHA        42      K                      READS: 500KV BS 1-5 11/19/89                      146 BKR 12X TRBL OHA        43      K                      READS: BS 1-9/9-10 11/19/89                      147 500 KV BKR FLASHOVR OHA        44      K                      READS: OSCILLO TRBL 11/19/89                      148 OHA        45      K                      READS: 500KV LN llX 11/19/89                      149 RT RECVR TRBL OHA        46      K                      READS: 500KV/LN21X 11/19/89                        150 RT RECVR TRBL OHA        36      K                      READS: 500KV BS 1-9 11/19/89                      151 BKR 32X GRND I FAIL OHA        37      K                      READS: 500KV LN llX 11/19/89                      152 RECVR REN TRIP
* OHA        38      K                      READS: 500 KV LN    11/19/89            I I      153 21X RECVR REN TRIP
 
                                                                                              - - - - -
Page No,    28 12/09/89 SALEM SIMULATOR STATION vs SIMULATOR HARDWARE DIFFERENCES DATABASE UNIT 1 SORTED BY PANEL
* PHOTO #/
VIDEO FRAME COMPONENT      PANEL ITEM GROUP NUMBER NUMBER CATEGORY
  ----------- --------------- ---------- -------
DESCRIPTION DATE              DATE IDENTIFIED IMPACT FIXED RECORD NUMBER
                                                ------ --------------- ------------------- ========== ====== ======== ======
                                        ------- ------
OHA        28      K                      READS: CNTMT VENT  11/19/89            I I      154 ISOL RESET W/ACT SIGNL OHA        29      K                      READS: 500KV LN llX 11/19/89                    155 BU CARR TRBL OHA        30      K                      READS: 500KV LN 21X 11/19/89                    156 BU CARR TRBL OHA        20      K                      READS: 500KV BS    11/19/89                    157 2-10 BKR 31X GRND I FAIL OHA        21      K                      READS: 500KV LN llX 11/19/89                    158 REG CARR TRBL OHA        22      K                      READS: 500KV LN 21X 11/19/89                    159
* REG CARR TRBL OHA        12      K                      READS: 500KV LN 21X 11/19/89                    160 CARR CHK TRBL OHA        13      K                      READS: 500KV LN llX 11/19/89                    161 REG RELAY PWR FAIL OHA        14      K                      READS: 500KV LN 21X 11/19/89                    162 REG RELAY PWR FAIL OHA                K                      READS: 500KV LN llX 11/19/89                    163 CARR CHK TRBL OHA                K                      READS: 500KV LN llX 11/19/89                I    164 REG/BU POT FAIL OHA                K                      READS: SOOKV LN 21X 11/19/89            I        165 REG/BU POT FAIL OHA        24      K                      READS: POPS CH. 1 11/19/89              I I      166 AUX AIR PRESS LO
 
SP-206 HOPE CREEK & SALEM SIMULATOR Location and Operation of Instructor Controls
* The primary location for operating and monitoring the simulator is the instructor console located in the instructor area. Available in this area are:
Control Monitor CRT and keyboards Two terminals accessing the simulation computers Communications equipment supporting the simulation of the control room environment Hope Creek                            Salem Display Monitors  (SPDS, CRIDS,      Display Monitors RMS)
The STATIC CHECK feature provides A hand held remote control unit      the instructor with a visual is provided allowing instructor      indication of those console and/
control of the most often used        or side panels which have digital features from the simulator floor. controls improperly selected for a given IC.
FREEZE(RUN)    The simulator can be placed in "freeze" at any time        The BACKTRACK feature enables the stopping the stopping the dynamic    instructor to select an initial
* simulation at the condition just      condition which existed up to 60 before the freeze. The simulator  minutes previously, and began the can be placed in freeze from the      training exercise from that instructor control pad or the hand    condition.
held remote via a single push button switch toggling modes each    The FAST TIME feature enables the time the push-button is depressed. instructor to control certain process variables up to 10 times FAST TIME The instructor can          their normal speed.  (e.g., Xenon select a "fast time" base of 10,      concentration, condenser vacuum.
30, or 60 times real time from the initial entry page of the PCM.        The SNAPSHOT feature allows the Operation in fast time is            instructor to record the initiated by depressing the FAST      simulator status into computer TIME push-button on the instructor    memory at any time.
control pad, and is identified by back-lighting of the switch. Fast A remote device capable of time cannot be selected via the      initiating the FREEZE/RUN/EXIT hand held remote. Operation in        STATIC CHECK functions.
fast time affects only the following portions of dynamic        The Safety Parameter Display simulation:                          System (SPDS) "Backtrack" feature 0  Main turbine warm-up/cooldown    provides for the review of 0
Xenon transients                critical data as it developed.
0  Plant cooldown (RHR shutdown cooling)
* 0  Post LOCA hydrogen concentration Appendix 2                  Date: 08/04/89 Page 1 of 4                Rev. : - - -
 
SP-206 Hope Creek                          I Salem
* 0 Hydrogen recombiner operating    In addition, SPDS and RMS temperature                      displays may be changed, while SLOW TIME The instructor can          the simulator is in FREEZE, to select a "slow time" base of one      allow the instructor to half or one tenth of real time on    emphasize Critical Function the initial entry page of PCM.        Status Tree issues.
Slow time affects all dynamic simulation, permitting the            The override capability of analog observation of transient              /digital inputs/outputs (OVDI, conditions. Slow time is            OVDO, OVAI, OVAO) provides the initiated by depressing the SLOW      instructor with the means to TIME push-button on the instructor    simulate a wide variety of control pad and is identified by      equipment failures and backlighting of the switch . . Slow  malfunctions.
time cannot be selected from the hand held remote.
RESET/READY Reset of the simulator forces the simulator into freeze and identifies through flashing lights controls that do not agree with the selected initialization condition.
Adjusting the misaligned control to the required position will
* cause the light to out. When all controls are properly positioned the simulator will "drop through switch check" and initialize at the selected condition. At this time the simulator interface with the CRIDS, RMS, and SPDS computers
  /programs are updated to reflect the new condition. When completed the READY light on the split bezel RESET/READY push-button will illuminate identifying the simulator may be placed in the RUN mode. On the hand held remote this function is performed through the RST push-button.
SWITCH CHECK OVERRIDE The instructor may override switch check during the reset process by depressing the SWITCH CHECK OVERRIDE push-button, initializing the simulator with all controls at the last position prior to reset.
Depressing the SWITCH CHECK OVERRIDE push-button a second time
* will override the CRIDS, RMS, and SPDS program updating and illuminate the READY light, Appendix 2                  Date: 08/04/89 Page 2 of 4                  Rev. : ---"o___
 
SP-206 Hope Creek                        I Salem
* allowing the simulator to be placed in the RUN mode. On the hand held remote switch check override is performed through depression of the RST push-button.
MALFUNCTIONS The instructor can select up to 50 active or pending malfunctions at anytime during simulator operation. Malfunctions can only be selected and inserted from the PCM.
A selected malfunction can be triggered from the PCM as they are selected, or can be assigned to a "remote" trigger or "event" trigger for activation. The "remote triggered malfunctions" allow instructor activation from the hand held control unit.
  "Event triggered malfunctions" are activated by the occurrence of a specific event during simulation,
** e.g. start of a pump, low vessel water level.
Once triggered, the malfunction activation may be instantaneous, or delayed up to 12 hours (in 1 second intervals).
EVENT-TRIGGERED MALFUNCTIONS Event triggered malfunctions may be activated by the occurrence of an event within the simulated power plant such as a pump trip or low reactor water level. The desired malfunctions can only be selected and assigned from the PCM.
REMOTE FUNCTIONS Approximately 400 remote functions are available to simulate local operation of remote equipment.
BACKTRACK The backtrack function allows an alternate method for
**
establishing the initial condition selection. The simulator can backtrack up to 60 minutes in one minute intervals and initialize at Appendix 2    Date: 08/04/89 Page 3 of 4  Rev . : ----'o'----
 
SP-206 Hope Creek                          Salem
* the selected time interval selected. Initiation of backtrack and step reverse are available on both the instructor control pad and the hand held remote; step forward is only available at the instructor control pad.
Initialization at the selected time requires reset of the simulator following selection through the backtrack feature.
INSTRUCTOR OVERRIDE Control of any input or output hardware~
located on the simulator panels may be overridden by the instructor emulating the operation of switches, indicators, and indicating lights. The instructor can also override annunciators causing alarms that do not result from an actual plant condition.
These overrides can only be initiated from the PCM, and can be triggered as discussed under
* MALFUNCTIONS .
INSTRUMENT NOISE Noise characteristic to station instrumentation can be switched on or off from the initial entry page of the PCM.
DAILY OPERATIONAL READINESS TEST This feature allows the instructor to check the operability of all lamps, meters, recorders, and switches .
* Appendix 2 Page 4 of 4 Date: 08/04/89 Rev. : - - -
 
SP-206 HOPE CREEK/SALEM SIMULATOR Initial Condition Validation and Database
* All simulator modifications or revisions to any procedure used to set the protected ICs must be evaluated for impact on all protected initial conditions by the Simulator Performance Engineer. All changes to a protected initial condition must also be under the direction of the Simulator Performance Engineer.
Hope Creek                          Salem Each of the res presented in        Each of the res presented in Appendix 3 were developed from      Appendix 3 were developed from re-01, 02, or 03 representing a      the 100% power condition at BOL, cold shutdown plant condition at    MOL, and EOL respectively, and BOL, MOL, and EOL respectiveiy. A  were created utilizing all complete plant startup was          applicable integrated and system performed utilizing all applicable  operating procedures. All integrated and system operating      subsequent res were created at procedures. All subsequent res      various plant conditions valuable are shot recording the various      to training such as initial stages of the startup valuable to    criticality, steam generator feed training such as initial            pump startup, main turbine roll, criticality, reactor feed pump      and main generator synchron-startup, main turbine roll, and      ization etc.
main generator synchronization .
*
* Appendix 3 Page 1 of 6 Date: 08/04/89 Rev.: - -O- - -
 
SP-206 SALEM SIMULATOR SIMULATOR INITIAL CONDITIONS
* res 01 Reactor Power 10096 Boron PPM 1153 Rod Bank D
Rod Step 228 Xenon
                                                  "-
                                                  **o ST~\BLE Core Life BOL Remarks' IOP-'1 II 02    l 00&deg;,,      592    D        215      SL',BLE
* 2-lOL      IOP-4
() 3  l 0 090      709    D        228    I:\CRE"\S I\'G        :iOL        IOP-.J
(\
  *J -1
        . 100&deg;t1        99    D        213      :JT_\BL;:::          EOL        IOP--+/-
05      9 596      601    D        219      ST.\BLE            '.'IOL      IOP--+/-
06      8 3"0    1169    D        201      STABLE              BOL        IOP--+/-
07      7 5'16    121    D        1 7 :+/-    STABLE              EOL        IOP-4 08      7 096      633    D        202      ST~::i..BLE        :JOL        IOP-d 09      7 0&deg;0      793    D        188    INCRL\SING            :VIOL      IOP--+/-
10      6 590      109    D        178    I\CREASI:\G            EOL        IOP-4 11      ~12&deg;0      650              188      STABLE                          IOP-~
* D                                      :101                    i I
1 ')
i.W    50&deg;6      851    n LI        200    I\"CREASil\'G          :"10L      =(J p -- -J II I;I 13      d7<lo    1250    D        1 9-+/-    ST_:',,.BLE          BOL        IOP--+/-      ,,11 j'
1  1
_1_--,  25-%      892    D        892    L~C    RL:',,.S L-~G  :lOL        IOP--+/-      I I
I 15        7'10    898    D        125    L\CRL.\SI:\G          :IOL        IOP-3 II 16        596      898    D        125    I:\CRL\SI:JG          :VIOL      IOP-3      I I
I 17        390    1573    D        159    I:\CRL\SI\'G          BOL        IOP-3 STEP        11 5.20        I I
18    CRITICAL    898    D        108      ST.\BLE            ~IOL        IOP-3
          @lEl0- 0                                                                            I AMPS 11 19    SR *g; 4000 1573    D        1-+/-4      STA.BLE            BOL        IOP-3      II CPS                                                                      STEP        II 5.11        I 20    STAR Tl.IP  1573                        ST~i\BLE            BOL        IOP-3 STEP
*-                                                                                5.11 Appendix 3                              Date: 08/04/89 Page 1 of 2                              Rev.: ----'-0_ _
 
SP-206 SALEM SIMULATOR SIMULATOR INITIAL CONDITIONS CONTINUATION
-*    I Cs I' 21 Reactor Power STARTl'P Boron PPM 896 Rod Bank Rod Step Xenon
                                                      %
SY\BLE Core Life
                                                                  '\10L Remarks II IOP-3    11 11 STEP II                                                                      5.11    I
    !I
_IOP-3 I
I I  22    STARTUP        1375                      STABLE      BCL I
I                                                                        STEP 5.11 I
i I
23    :\OP /:\OT      755                      STABLE      '\IOL      IOP-8    II II I
I  ? :t1
      ~    CSD            1425                    DECREASDJG    :101      IOP-2 I  25    CSD            1438                    DECREASI:\iG  '\lOL      IOP-2    I I  26    HSD            1425                    DECREA.SI.\JG '\JOL      IOP-2 I                                                                        STEP I!                                                                        5.8 I
27    HSD            1425                    DECREASI:JG  '\IOL      IOP-2 I                                                                        STEP
* I
  !
I 5.13 i
**
Appendix 3                    Date: 08/0-J./8S Page 2 of 2                    Re\-.: - -
 
SP-206
                      - HOPE CREEK & SALEM SIMULATOR Malfunctions
* Appendix 4 contains a listing of malfunctions available to the simulator instructor.
All malfunctions listed are tabulated identifying Malfunction Test Procedure (MTP} number, Description, and Periodicity of Testing.
For Periodicity:      AO  = Annual Operability 25%( )  = Indicated test required every. 4 years, with the offset year in parentheses.
Off set ye?r for Hope Creek = 1988 Salem      = 1989
*
* Appendix 4                Date: 08/04/89 Page 1 of 1                Rev.: - - O- -
 
SP-206 SALEM SIMULATOR MALFUNCTION TEST PROCEDURE DATABASE
* 1  MTP*
    !NUMBER          DESCRIPTION SORTED BY MTP NUMBER PERIODICITY
    !MTP-001      I REACTOR  COOLANT SYSTEM Il\:TERMEDIA.TE LEG      25%(1)
IRl'PTl'RE  OF NO. 21, 22, 23,24 {DOUBLE ENDED BREAK)
I I:YITP-002      RCS LE_i\K INTO CONTi\L\lMENT                      2590(2)
IMTP-003        LOSS OF RKl\.CTOR COOLANT PUMP NO. 21 OR 22        25%(3)
    ! '1TP--On 1--    - v J~  LOSS OF RKi\CTOR COOLANT PUMP 23 OR 24            2596(4)
MTP-005 I
RCP 21, 22, 23 OR 24 SHEARED SHAFT                25%(1)          I 1
MTP-007      RCP 21, 22, 23 OR 24    NU~IBER 1 SEAL FAILURE    25%(2)
IY!TP-008      jRCP 21, 22, 23 OR 24 NUMBER 2 SEAL FAILURE          25%(3)
I!
I :YITP-009      RCP 21, 22, 23 OR 24 NUMBER 2 SEAL F_!\ILURE      25%(4)          I
                                                                                        !
*
  ! ~!TP-010        RCP 21, 22, 23 OR 24 BINDING SHAFT                2 596 (1)
I                                                                                    I l:Y1TP-011      IRCP 21, 22, 23 OR 24 LOSS OF UPPER LUBE OIL COOLER ccw TO THE      25%(2)
                                                                                        '
i I
I :Y!TP--012 I
RCP 21, 22, 23 OR 24 HIGH VIBR_i\TION              25%  (2)
I I!, '\-Ff'D
      -. - - 01 3 L
RCP 21, 22, 23 OR 24 THERMAL B.!\RRIER F_i\ILURE 2596(4)          I j "'ITP-01 .:1  LOOP 21, 22; 23 OR 24 HOT LEG RTD OUT OF          25~'6(1) 1*        -  - ~
CALIBRATION l:Y!TP-015        LOOP 21, 22, 23 OR 24 COLD LEG RTD OUT OF CALIBRATION 2 596 ( 2)
I
::XTP-016    NARROW RANGE PRESSURIZER PRESSURE CONTROL          25%(3)
TRANSMITTER NO. 457 OUT OF Cl\.LIBRATION I
r1TP-017          HOT CALIBRATED PRESSURIZER LEVEL TR.i\NSMITTER 2 596 ( 4)
I,                NO. LT 461 OUT OF CALIBRATION, HIGH/LOW IMTP-018          PRESSl'RIZER POWER OPERATED RELIEF VALVE          25%(1)          I 2RP1 OR 2RP2 DEVELOPS VARIABLE LEAK I:VITP-019        PRESSURIZER SPRAY VALVE 2PS1, 2PS2, 2PS3            2 596 ( 2)
FAILS OPEN/CLOSED
* I XTP-020      PRESSURIZER SAFETY VALVE 2PR3, 2PR4, OR 2PR5 25%(3)
FAILS OPEN/CLOSED Appendix 4                    Date: 08/04/89 Page 1 of 12                  Rev.: - -
 
SP-206 SALEM SIMULATOR
* MALFUNCTION TEST PROCEDURE DATABASE SORTED BY MTP NUMBER MTP
    \NUMBER IjDESCRIPTION                                          I\PERIODICITY I
i I                                                                      I II :'-HP *-021 II PRESSURIZER- ,\UXILIARY SPRAY VALVE L\.ILS OPE:\ 2590 (-+/-}
J I
I l)'ITP-023      PRESSURIZER BACKUP HEATER 22 FAILURE I
II                  I I :'-ITP--025    LOSS OF CO'."IPONENT COOLDIG WATER TO NO. 21,        12 596 ( 1}        I 22, RHR HEAT EXCHANGER (VALVE 21CC15,                I 2CC15 FAILS CLDSED}                                  I I MTP*-026        LOSS OF RESIDL\.L HEAT REMOVAL PUMP NO. 21,            2 596 ( 2) 22 ( ELECTRIC\L TRIP)
MTP-027        LETDOWN LK'\K DITO CONT_:\INMENT                      2 596 (.3)
MTP-028        LETDOW:.:- ISOLATION V.\LVE 2CV277 FAILURE            25% ( 4)
MTP-029        CCW.FLOW CONTROL VALVE TO THE LETDOWN HEAT          12 596 ( 1}
EXCH.'\>JGER FAILURE
* 1. MTP-0 I
I i
I MTP--0 Jl
    !"'ITP-032 30 IRCS LEAK INTO CCK THROUGH A TUBE LEAK IN THE 2596(2)
LETDOWN.HEAT EXCHANGER
                  !RCP SL\L I'.'JJECTION FLOW IFAILCRE I
I CO~TROLLER (2CV71)
BLENDER BORIC .:\.CID FLOW CO::\TROLLER FAILURE II 25 9o(J) 12596(4)
I I
I I
I- -          J I
i IMTP-033          BLE>!DER PRI:-IARY WTR FLOW CONTROLLER FAILURE 12596(1)
I I                                                                    I                    I I:ITP-0 3 4      23 CH2\.RGING PU'.'1P TRIP                          j2596(2)
IMTP-035          MASTER CHARGING FLOW CONTROLLER FAILURE                2 596 ( 3)      I MTP-036        VCT LEVEL TRANSMITTR LT-114 FAILURE                    2590(-+/-)
    , :V!TP-037 I
I VCT LEVEL TR.i'l.NS'."lITTER LT-112 FAILURE            25%(1)          I MTP-039        VOLUME CNTL TNK RELIEF VALVE 2CV241 FAILURE            25516(2)
MTP-040        FUEL LEAK PRODl'CP.JG VARIABLE CONCENTRATIO:\J        2 596 ( 3}
OF FISSION PRODUCTS IN RX COOLANT SYSTEM MTP-043        CHARGING LINE LEAK (INSIDE AUXILIARY BLDG}            2596(4)
,*. MTP-0 '1:1    UNCONTROLLED CONTINUOUS ROD WITHDRAWAL: RODS 2596(1)
IN MAND AL CONTROL Appendix 4                Date: 08/04/89 Page 2 of 12              Rev.: ---"-0_ _
 
SP-206 SALEM SIMULATOR MALFUNCTION TEST PROCEDURE DATABASE
* I I
I!M'T'P 1
          - ...
NUMBER
                  ~
I IDESCRIPTION SORTED BY MTP NUMBER PERIODICITY
      !I --- -
v['"fD -  0 48
                                      !ROD :n SALIG:\'vIE.'\:T, FAILURE OF RCCS H-12 5AXK                      2 5&deg;-o ( 2)
                                        "D" "I'O              ~O\'E I
I i                                                                      I I VFT'P-f't:)1                  lmwPPED RCC_\ H-8 I
I~:~~-~:~--
1----                              DROPPED CO'.\JTROL                        . ROD 254                    2 596 ( 3)        I I
II --l'vf'T'P-
              . . - 0 ~ -'J,
                        ~            I DROPPED CO::\TROL ROD 251                                              25%(4) j:nP-057                      lco>rTROL RODS FAIL TO MOVE ON DEMAND (AUTO-                            125%(1)
IM_l\TIC                A'.'JD MANU_:\L) i                                I I
I:V1TP-0 5 8                      IL\ILURE                    OF _\UTOMATIC RL\CTOR TRIP                  2 596 ( 2)      I
                                                                  --
II MTP-Oi::q\
          -- -        ..) - -        I FAIU,"RE Of                        'vL\'.\'L\L  REACTOR TRIP          2596 (3)          I I                                                                                                                              I I::nP-o 59B                          FAILT_:?_E                ni::-
                                                                  ...... ~ :1.\):l' .\L SI/REACTOR TRIP      !259a(cl) i
                                  -
1-"'IT--P -- nS1
* I
    ,I ______
j V--                ROD CO:\fTROL SPEED PROGR_\M FAILURE                                  12 5?6 ( 1) 1 i                                                                      I                  II I
    ~TP -064                        I! C'TTTCT/
J....)  u  ... ~    ROD I
125 96(2)          I I                                                                                          I II :viTo
          -. - --nh
              ~      - ,_ i::,--    II c*- O\i'T'R
                                              --. -- m
                                                  ~      *-* -    ROD 1D4 STl1CK                              2 596 ( 3)
I I
                                -
ll:!TP-066                        ITR5 TRIP Dl'E TO FAILURE OF 20ET SOLEKOID VLV 2596(4)                                      I
    .-----
I :ffP-067                          EHC SPEED REFERENCE CHANNEL FAILURE                                    2 596 ( 1)
I I                                                                                                                            I I::ITP-068                          EHC ::IAIN SPEED CHANNEL FAILURE                                        2 596 ( 2)
I:VITP - 0 6 9                      FAILURE OF TURBINE TO TRIP                                              2596(3)          I I'.'1TP-070 I
EHC LOAD REFERENCE CHANNEL FAILURE                                      25%(4)
I I:V!TP--071                          LOAD CHAN (PIP UL SE PRESS TRA:"JSDUCER) FAILURE 2 596 (1) i I
I::ffP-072                          DC POWER SUPPLY FAILURE TO EHC SYSTEM                                  2596(2) i
:i~TP-07 3                        FAILURE OF ECH M2\l': TR.\CKING OF Al.ITO SIGNAL                        2 5&deg;-o ( 3)      I I
l~TP-075                          l'vL\IN TURBINE LOSS OF LUBE OIL                                        2 596 ( 4)
I                                                                                                                            I I :VITP-076                        LUBE OIL TEivlPERATl'RE HIGH I LOW                                      2 596 ( 1)
**
11
:"ITP-077                    LUBE OIL PRESSURE LOW                                                  2596 ( 2)
                                                                                                                                !1 I :JTP-079                          STEA~                GEN TUBE R'CPT'CRE 9::-JO. 21, 22, 23, 24)        25%(3) i
                                                                                    .l\ppendix 4        Date: 08/04/89 Page 3 of 12        Rev.:    - -
 
SP-206 SA.LEM SIMULATOR MALFUNCTION TEST PROCEDURE DA.TA.BA.SE
* IDESCRIPTION SORTED BY MTP NUMBER
                                                                                        ,
j '."ITP-080 I:VIEGW.\TT TRA'.'JSDUCER FAILS HIGH/LOW ( L\JPUT        12596(4) jTO EHC)                                                                    'I I
i                                                        I IMTP-081      !TURBINE CONTROL VALVE 21, 22, 23 OR 24 :VIS 2 9 12596(1)
                  !FAILS OPEN/CLOSED                                      I                  1, IMTP-082        TURBDJE CONTROL VALVE 21, 22, 23 OR 24 :1S29            25%(2)
L\ILS AS IS I
I i"lTP-083    TURB HIGH VIBRATION LOW PRESS SECTION NO. 23 25%(3)
MTP-085      LOSS OF TURBI:\!E TURNBJG GEAR MOTOR                    25%(4)
MTP-086      LOSS OF VACUUM (DUE TO AIR I\:LEl1.K_\GE)                2 5%  (1)
  !l jMTP-088        MAI'.\! STEAM LINE RUPTURE UPSTREAM OF THE              2596(2)
FLOW ORIFICE
*
::ITP-089    L\ILURE OF Jl.UTOMATIC TURBDJE RU'NB.\CK TO STOP 2596(3)
_\FTER OTD_T/OPD_T CONDITION CLK\RS I
I IMTP-090        :V!AI'.\i STEAM LINE RUPTURE I'.\SIDE CONTAL\'ME:\:T    2596(4)
I II :VITP-091    jMAI'.\' STEXM LI:\JE BRL;'.l,.K OUTSIDE CONTAINMEXT      2596(1)        I i
IMTP-092        MSIV FAILlJRE (MS-167) OPE'.'J/CLOSED                    25%(2)
Ii"ITP-093 I
FAILURE OF TURBI'.\'E BYPASS VALVE CONTROL              2 596 ( 3) 1"1TP-095        STE.\M GENER.\ TOR LEVEL TR.i\:'.\JSMITTER FltILURE      25 96(,J) i Ii"!TP-096        STEAM GENERATOR NO. 21, 22, 23 OR 24 FEED                2 596 ( 1)
FLOW CHANNEL I TRANSMITTER FAILS I
jMTP-097        STEAM GENERATOR 21, 22, 23 OR 24 FEED FLOW              2 596 ( 2)
I CHANNEL II FAILURE IMTP-098        STEAM GENERATOR STEAM FLOW CHANNEL I TRANS-              2 596 ( 3)
MITTER FAILURE MTP--099    STK\M GENERATOR STM FLOW CHANNEL II FAILURE              2 596 ( 4)
IMTP-100        STEA:VI GE'.\JER_l\TOR PRESSURE TRANSMITTER CHAN-        2596(1)
NEL III (PT-526, PT-536) OR CHANNEL IV-
*                    (PT-516, PT-546)
Appendix 4                  Date: 08/04/89 Page 4 of 12                Rev. : ---'-0_ _
 
1-----
SP-206 SALEM SIMULATOR MALFUNCTION TEST PROCEDURE DATABASE
* JIMTP j1 NUMBER                DESCRIPTION SORTED BY MTP NUMBER II PERIODICITY I'I I
I '1l'P-1 0 l 1-.    -- -              ~AI~    PRESSURE FEEDWATER    HEATER~O. 26A,  B, C    25%(2)
ITt'BE J
LL\K i
          ! :VITP-10 3              LOW PRESSURE FEEDWATER HEATER NO.        22A,  228  12 596 ( 3)
II                          OR 22C TLBE LEAK I
I:VlTP--104 I
STEA'.vl GENERATOR FEED PU'.v!P NO. 21 OR 22 TRIP        25%(4) i j  '."JTP-*107          FEEDWATER HEATER NO. 26A, B, OR C LEVEL                  25%(1)
I CONTROL SWITCH LSHH FAILS CLOSED                                        I II IMTP-110                  FEEDWATER LINE BREAK, OUTSIDE CONTAINMENT I'."1TP-111                  MAIX FEED LINE RUPTURE,      INSIDE CONTAINMENT i vl'TP-11 ')~            1 HOTWELL \0. 22 LEVEL TRANSMITTER (LA-0487)              25%(4) 11 *" - -
Ii II
                            -"
IFAILURE                                                                  I
* li idv!T -  P -- 1 1 4
                          ~~
I :VITP-116                LOSS OF HEATER DRAIN    P~P    NO. 21,  22,  23 I
(ELECTRICAL TRIP)
        !I                                                                                I I! WT'P
              -.        -1 1    7  LOSS Of CO~DENSATE    PU~P    NO. 21,  22,  23
                  .l. -    - -                                                            125%(3)
I (ELECTRICAL TRIP)
        '~
        '1 "!TP-1 1 *"'        -    - 1 uR    MAIN TURBINE STOP VALVE NO.      21,  22,  23, OR 24 MS28 FAILS OPEN/CLOSED I'
1' l !1TP-119                  MAIN STEAM SAFETY VALVE 21,      22,  23 OR 24 I                          MS14 FAILS OPEN I
Ii"ITP*-121                  HEATER DRAIN TANK 2A, B, C LEVEL CONTROLLER              25%(2)
LA 1Dl7Z (LA 1D19Z, LA1Dl2Z) FAILS
              '."1TP *-122          HEATER DRAIN TANK NO. 2A, B, C LEVEL CON-                25%(3)
TROLLER LA 1Dl7, LA1Dl9, LA1D21 FAILS HIGH I'
I IMTP-123                    GLAND SEAL REGULATOR FAILS CLOSED                        25%(4) l'.v!TP-124                CONDENSATE POLISHING DEMINERALIZER HIGH                  25%(1)
I                          DIFFERENTIAL PRESSURE I
MTP-126                MAIN FEEDWATER REGULATING VALVE 21, 22,          23      2 596 ( 2)
* OR 21 BF19 FAILS Appendix 4                    Date: 08/04/89 Page 5 of 12                  Rev.: - -
 
SP-206 SALEM SIMULATOR
* MALFUNCTION TEST PROCEDURE DATABASE SORTED BY MTP NUMBER I MTP NUMBER    !DESCRIPTION                                            PERIODICITY I i
MTP-127    I:\>L\I\'
BF40 FEED WATER BYPASS VALVE 21, 22, 23 OR 24 2 596 ( 3)
Fl1.ILS I
MTP-128      FAILURE OF STKi\M GENERATOR FEED REGULATING        125%(4)
VALVE BF19 TO RESPOND TO AUTOf-Li\TIC CONTROL Ti I ("1ANUAL I ,T OPERABLE)
I IMTP-129    jMAIN STEAM RELIEF VALVE 21, 22, 23 OR 23MS10 I 2 596 ( 1) i MTP-131      STEAM GENER_i\TOR FEED PUMP (SGFP) MASTER CONTROLLER INPUT (PT-508) FAILURE 12596(2)            I "1TP-132    LOSS OF TURB DIE AUXILIARY COOLING WATER              2596(3)
PU:\>IP NO. 21, c...c..., 23 (ELECTRICAL TRIP)
                                    ') ')
    "1TP-133    LOSS OF STATOR COOLING WATER PU"1P NO. 21, 22 25%(4)
MTP-134      LOSS OF ALL OFF SITE POWER                            2 596 ( 1)
*  :VITP-135 I "1TP -13 6 I~ITP-137 LOSS OF 21 ST_i\TION POWER TR.:\NSFORMER LOSS OF 22 STATION POWER TR_i\NSFORMER LOSS OF STA.TION POWER TR.ci\NSFORMER NO. 1 2596 ( 2) 2 596 ( 3) 2596 ( 4)        I I~I'TP-13 8    LOSS OF STl1.TION POWER TR'"i\NSFORMER NO. 2          2 596  (1)
I MTP-139      LOSS OF AUXILIARY POWER TRANSFORMER                  2596(2)
I!lTP-140      LOSS OF 2H 4 KV GROUP BUS                            25'?6 ( 3)
IMTP-141      LOSS OF 2E 4 KV GROUP BUS                            25%(4)
I:ITP-142      LOSS OF 2G 4 KV GROUP BUS                            2 5'?6 ( 1)
I                                                                    25%(2)
MTP-143      LOSS OF 2F 4 KV GROUP BUS                                              I MTP-1-14    LOSS OF lA 4 KV VITAL BUS                            2 596 ( 3)
MTP-145      LOSS OF 2B 4 KV VITAL BUS                            25%(4)
MTP-146      LOSS OF 2C 4 KV VITAL BUS                            2 5'?o ( 1)
:VITP-147    LOSS OF VITAL INSTRUMENT BUS 2A                      25%(2)
* MTP-148      LOSS OF VIT.ci\L INSTURMENT BUS 2B Appendix 4 2 596 ( 3)
Date: 08/04/89 Page 6 of 12        Rev.: - -
 
SP-206 SALEM SIMULATOR MALFUNCTION TEST PROCEDURE DATABASE
* ,MTP I
  !!NUMBER    jDESCRIPTION SORTED BY MTP NUMBER I PERIODICITY I MTP-149    LOSS OF VITAL INSTRUMENT BUS 2C                  2 596 ( 4)
MTP-150    LOSS OF VIT2\L INSTRUMENT BUS 2D                25%(1)
MTP-155    LOSS OF 2A 460/230  v  VITAL BUSES              25%(2)
MTP-156    LOSS OF 2B 460/230  v  VITAL BUSES              2 596 ( 3) 1 MTP-157    LOSS OF 2C 460/230  v VITAL BUSES              25%(4)
MTP-158    LOSS OF 2A 125 VDC BUS                          25%(1)
MTP-159    LOSS OF 2B 125 VDC BUS                          25%(2)
MTP-160    LOSS OF 2C 125 VDC BUS                          2596(3)
MTP-161    EMERGENCY DIESEL GENERATOR 2A TRIP              2 5% ( 4)
* MTP-162    EMERGENCY DIESEL GENERATOR 2B TRIP              2 596 ( 1)
MTP-163    EMERGENCY DIESEL GENERATOR 2C TRIP              25%(2)
MTP-167    AUTOMATIC VOLTAGE REGULATOR FAILURE              25%(3)          I MTP-168    LOSS OF MAIN GENERATOR EXCITER                  25%(4)
I I ~ITP-1 71  LOSS OF CONTAINMENT SPRAY PUMP NO. 21 OR 22      2 596 ( 1)      '1 IMTP-172    LOSS OF COMPONENT COOLING WATER PUMP NO. 21, 2596(2) 22, 23 (ELECTRICAL TRIP)
MTP-173    LOSS OF CONTAINMENT FAN COIL UNIT 21, 22, 23 25%(3) 24 OR 25 MTP-177    FALSE CONTAINMENT PHASE .\ ISOLATION SIGNAL      25%(4)
(TRAIN A OR B)
IMTP-179    SI ACCUMULATOR NO 21, 22, -23 OR 24 WATER        25%(1)
SPACE LEAK MTP-180    SI ACCUMULATOR NO. 21, 22, 23 OR 24 GAS          2596(2)
SPACE LEAK MTP-181    LOSS OF AUXILIARY FEEDWATER PUMP NO. 21, 22      25%(3)
*              (ELECTRICAL TRIP)
Appendix 4                Date: 08/04/89 Page 7 of 12              Rev. : - -    0--
 
SP-206 SALEM SIMULATOR MALFUNCTION TEST PROCEDURE DATABASE
* I I MTP
    'NUMBER              DESCRIPTION SORTED BY MTP NUMBER IPERIODICITY I I
:'1TP-182        1 FA.ILT.'RE OF PRESSURE OVERRIDE PROTECTION                      0:\    2 5&deg;6 ( -1)      I l\'O. 21, 22 AUXILL\RY FEEDWATER Pl}:1P                                                  I I
I                  I i~TP-184
                                                                                                !
FAILURE OF S_?\FETY INJECTION Pl'.MP NO. 21, 22                      j25 9o(l)          I I
TO START ON SI SIGNAL                                                I I
I I                                                                        !
I'ITP-185            jFAILURE OF CHARGING PU'.1P :'-JO. 21, 22 TO START j 2596 ( 2)                              i
                        \UPO'.'J SAFEGUARD ACTUATION                                            I                  11 I:--ITP--187          FALSE OVERPOWER DELL\              -  T TRIP SIGNAL                    25%(3)
(TR_i\IN A. OR B)
MTP-189        \LOSS OF CONTROL POWER TO POWER RANGE 1'\J41 I - . - -'- ,
I
:\!42, N43 OR N44 CHAN~ELj25%(4)
I
                                                                                                                    '
i I
IMTP--190            !
i jSOTJRCE RANGE CHANNEL '.'Bl            I '.'J32 L\.ILS                  2 596 ( 1)
MTP-191        !"NOISY"            - SOURCE R_'\.\"GE CHANNEL :>J-31 OR ::'-I-32 12596(2)
*
                      -                                                                          I l:'1TP-192          :LOSS OF INSTR. PWR TO SOURCE                    RA~GE  :'.'J-31,\"-32 l2s<>o(3)          I I
I I
:!ITP-19 3
                        !
jPOWER RANGE CHANNEL N41, N42, '.\J43 / :\:44 FAILS 2596(.J)                                I ii i
I  ::V!TP--194      ISOURCE            RANGE CHA0i;\'EL :>J31, N32 DISCRP.11::'-L\TOR          2 596 ( 1)
I I
I SETTING HIGH/LOW Ii                                                                                                              I l'."ITP-195        !Ii\:TERMEIDATE RANGE CHANNEL N-35, >i *-3 6 COM-                          2 5?-o ( 2)      i I
IPENS_\TING          VOLT,\GE HIGH/LOW                                                    I i                                                                                                              I I '-ITP - 971 INTERMEDIATE RANGE CHANNEL N35, \136 NOISY                              2596(3)          '
1-*          -
I
    ! :\lTP-198            FAILURE OF INTERMEDL".\TE RANGE P-6 ~ANUAL                              2596(4)          I I                      BLOCK TO DEENERGIZE SOURCE RANGE DETECTORS Ii __                                                                                                            I I:!ITP-199              POWER RANGE CHANNEL N41, )J42; N43, N44 NOISY 2 596 ( 1)                                I ffMTP-200              PROCESS RAD          ~0'.'HTOR  2RlL\ FAILS HIGH/LOW                  2596(2)          'I 2596(3)
I i:1TP-201              PROCESS RAD          ;v1o~ITOR  2R12B FAILS HIGH/LOW I
I
:VlTP-2 0 2        PROCESS RAD MONITOR 2Rl2A FAILS HIGH/LOW                                2 5% ( <+/-)
:'-1TP--20 3        PROCESS RAD :10.NTIOR 2R4L\ FAILS HIGH/LOW                              25%(1)
*-    '."lTP - 2 0 4
:nP-205 PROCESS RAD MONITOR 2R41B FAILS HIGH/LOW PROCESS RAD          ~ON I TOR 2R41C FAILS HIGH/LOW Appendix 4 2596 ( 2) 2 596 ( 3)
Date: 08/04/89 Page 8 of 12                          Rev.: - -
 
SP-206 SALEM SIMULATOR MALFUNCTION TEST PROCEDURE DATABASE
*  ,,
ijMTP jNUMBER I
I          .
I DESCRIPTION I
SORTED BY MTP NUMBER IjPERIODICITYII I
I:V1TP-206    !
jAREA RADIATIO:-J MONITOR 2R1A FAILS HIGH/LOW        25*% ( 4)        II I
I 2596(1)
I J  :'HP-207    PROCESS RAD MONITOR 2RllA FAILS HIGH/LOW IMTP-209        PROCESS RAD MOI'.'JTOR 2R31A FAILS HIGH/LOW        2596(2)
MTP--210    NON lE AREA RADL\TION :vIONITOR Fi\ILURES  (2R2,  25%(3) 2R4, 2R5, 2R34 OR 2R42A)
MTP-211    FAILl'RE OF NON lE FILTER PROCESS MONITORS          25%(4)
MTP-212    FAILURE OF APD PU:--IP FOR 2RllA, 2RllB, AND        25%(1) 2R12A MTP-215    LOSS OF SERVICE WATER PUMP NO. 21,  22,  23,    25%(2) 24, 25 OR 26 I!"ITP-216      SERVICE WATER HEADER LEAK IN THE SERVICE          125%(3)
* WATER STRUCTURE l:V!TP-21 7 ISERVICE  WATER LEAK    21,                        2 596 ( 4)
I Ii
                                        -    22 NUCLEAR HEADER                        I PENETRATION _\REA I
j :VlTP-218    SERVICE WATER LL\K IN CONTAINMENT ON NO.      23    259a(l)        I I              CONTAINMENT FAN COIL l'~IT I
I I:"ITP--219    LOSS OF CNTL AIR (LK BETWEEN 2CA39 & 2CA54)        2596(2)        I IMTP-223A      SEMI-AUTOMATIC SWAPOVER (TRAIN A)    FAILS        259a(3)
  *MTP-2238      SEMI-AUTOMATIC SWAP OVER (TRAIN B)    FAILS        25%(4)
IMTP-231        PROCESS RADIATION MONITOR 2R31A FAILS HIGH/        2 596 ( 1)
LOW (21 FAN COIL UNIT SERVICE WATER MONITOR)
MTP-232    PROCESS RADIATION MONITOR 2R31B FAILS HIGH/        2 596 ( 2)
LOW ( 22 & 24 FAN COIL UNIT SERVICE WATER MONITOR)
MTP-233    PROCESS RADIATION MONITOR 2Rl3C FAILS HIGH/        25%(3)
LOW ( 23 & 25 FAN COIL UNIT SVC WTR MONITOR)
MTP-234    PROCESS RADIATION MONITOR 2Rl6 FAILS IpGH/          2596(4)
LOW (PLANT VENT EFFLUENT MONITOR)
* IMTP-235        PROCESS RADIATION MONITOR 2R18 FAILS HIGH/
LOW (LIQUID RADWATSE DISPOSAL MONITOR)
                                  }\ppendix 4 2 596 ( 1)
Date: 08/04/89 I
Page 9 of 12                Rev. : - -    0 --
 
SP-206 SALEM SIMULATOR
* MALFUNCTION TEST PROCEDURE DATABASE SORTED BY MTP NUMBER MTP NUMBER      DESCRIPTION                                    PERIODICITY
    '.'1TP-236  PROCESS RADLi'\TION MONITOR 2R19A FAILS HIGH/  2596(2) 1 LOW (NO. 21 STM GENERATOR BLOWDWON :mNITOR)
MTP-237      PROCESS RAD MONITOR 2R19B FAILS HIGH/LOW        2596 ( 3)
MTP-238      PROCESS RAD MONITOR 2R19C FAILS HIGH/LOW        2 59-o ( 4)
                                  ~
IMTP-239    1 PROCESS RAD MONITOR 2R19D FAILS HIGH/LOW        25%(1)
MTP-240      PROCESS RAD MONITOR 2R44A F."\ILS HIGH/LOW      25%(2)
MTP-241      PROCESS RL\D MONTITOR 2R44B FAILS HIGH/LOW    25%(3)
I I
I
* II I
I I
l
* I I
Appendix 4              Date: 08/04/89 Page 10 of 12          Rev.: ---=--0_ _
 
SP-206 SA.LEM SIMULA.TOR PERFORMANCE TEST PROCEDURE DA.TA.BA.SE
* !!
llPTP jNUMBER I
DESCRIPTION SORTED BY PTP NUMBER II PERIODICITY II I
jPTP-001    REACTOR TRIP DUE TO MAIN GENERATOR TRIP              AO PTP-002  SIMULTANEOUS TRIP OF BOTH MFP'S                      AO PTP-003 I SP1ULTANEOUS    TRIP OB ALL MSIV'S                  jAO              I PTP-004  TRIP OF ALL RCP'S DUE TO LOSS OF    ccw              l1_0 PTP-005  21 AND 23 RCP TRIP                                    AO PTP-006  TURBINE TRIP WITHOUT REACTOR TRIP                    AO PTP-007  M}1.XIMU:1 RATE POWER RAMP                            AO PTP-008  Li\RGE BREAK LOCA WITH LOSS OF OFF-SITE POWER AO PTP-009  MAIN STEAM LINE RUPTURE I'.'JSIDE CONT.i\PJMENT      .\0
* PTP-010  PRESSURIZER PORV STUCK OPEN                          l1.0 PTP-011  STEAM GENEATOR TUBE RUPTURE                          2596(3)
PTP-012  CHARGING LINE LEAK                                    25%(4)
PTP-013  PRI'.':L\RY SAFETY VALVE STUCK OPEN                    2 596 ( 3)
PTP-014  LOSS OF CONTROL AIR                                    25%(2)
PTP-015  LOSS OF 2C 4KV VITAL BUS                              25%(1)
PTP-016  LOSS OF 2A 115 VAC BUS                                2 596 ( 2)
PTP-017  LOSS OF 2B 125 VDC BUS                                2 596 ( 2)
PTP-018  LOSS OF CONDENSER VACUUM                              25%(1)
PTP-019  LOSS OF SERVICE WATER                                  2596(2)
PTP-020  LOSS OF RHR COOLING                                    25%(2)
PTP-021  LOSS OF ALL FEED WATER                                2596 ( 4)
PTP-022  PRESSURIZER PRSSURE CHANNEL FAILURE                    2596(3)
* PTP-023 PTP-024 CONTROL ROD MALFUNCTIONS PRESSRUIZER SPRAY VALVE FAILS OPEN Appendix 4 2 596 ( 1) 2 596 ( 2)
Date: 08/04/89 Page 11 of 12              Rev.: -------'-0_ _
 
SP-206 SALEM SIMULATOR
* PERFORMANCE TEST PROCEDURE DATABASE SORTED BY PTP NUMBER PTP NUMBER    DESCRIPTION                                      PERIODICITY PTP-025    PRESSURIZER LEVEL CHANNEL FAILURE                25%(4)
PTP-026  MAIN STEATVJ LINE RUPTURE OUTSIDE CONTAINMENT    2596(1)
PTP-027  FUEL CLADDING FAILURE                            2596(3)
PTP-028  M2\IN FEED  LINE~RUPTURE OUTSIDE CONTAINMENT    2596(1)
    . PTP-029    :VIAIN FEED LINE RUPTURE INSIDE CONTAINMENT      25%(4)
PTP-030  POWER RANGE NI CHANNEL F_Z\ILURE                  25~'o(l)
PTP-031  STEAM GENERATOR FEEDWATER FLOW CHAN F.Z\ILURE 125%(2)
IPTP-032    TURBI'.\JE BYPASS SYSTEM FAILURE                2 596 ( 1) iPTP-033    ANTICIPATED TR2\NSIENT WITHOUT A TRIP            2 596 ( 2)
I
* PTP-~01  COLD SHUTDOWN TO HOT STANDBY                    ,Z\S REQUIRED PTP-:J02  HOT STANDBY TO MINIMUM LOAD                      _i\S REQUIRED IPTP-\:03  POWER OPER.'\TION                                AS REQUIRED PTP-N04  MINIMUM LOAD TO HOT STANDBY                      AS REQUIRED PTP-N05  HOT STANDBY TO COLD SHUTDOWN                    l1.S REQUIRED PTP-:.'W6 MAINTAINING HOT STANDBY                          AS REQUIRED IPTP-RTl    COMPUTER REAL TIME TEST                          AO
    .PTP-SSl    25% POWER                                        AO
    !
PTP-SS2  75% POWER                                        AO PTP-SS3  100% POWER                                      AO PTP-SS4  SIMULATOR STABILITY                              AO I
Appendix 4              Date: 08/04/89 I                                  Page 12 of 12            Rev. : - -
I L
 
SP-206 HOPE CREEK & SALEM SIMULATOR Remote Functions
* Appendix 5 contains a listing of remote functions available to the simulator instructor.
All remote functions are tabulated by either remote function number or system designator and also by the associated description .
*
* Appendix 5                  Date: 08/04/89 Page 1 of 1                  Rev . : _ ___;o;.....___
 
SP-206 SALEM SIMUL_l\TOR
* REMOTE FUNCTIONS ANALOG - CAN.l\.
llMAIN TURBINE AND LUBE OIL                        (MT)
I
: 11. 2TL45 MTLO CLR THREE WAY VLV I
ICONDENSATE AND FEEDWATER                          (CF)
I
: 1. 21CN15 21 C.\i PMP DISC VLV
: 2. 22CN15 22 C:J PMP DISC VLV
: 3. 23CN15 23 CN PMP DISC VLV
: 4. 21C0l77 21A CD TO XFER STOP VALVE
: 5. 22CY.77 22A CD TO XFER STOP VALVE
: 6. 23C"':li77 23A CD TO XFER STOP VALVE
: 7. 21C:'\81 21B CD TO XFER STOP VALVE
* 8.
9.
10.
22C:J81 22B CD TO .XFER STOP VALVE 23C:.\f81 23B CD TO XFER STOP VALVE 21CN106 21 C:\l P:"IP DISC BYPASS
: 11. 22CN106 22 CN PMP DISC BYPASS
: 12. 23CN106 23 CN PMP DISC BYPASS I
: 13. 21BF3 21 SGFP DISCHARGE VALVE
: 14. 22BF3 22 SGFP DISCHARGE VALVE 115. 2BF66 CLEANUP BYPASS VLV
  !AUXILIARY FEEDWATER                                (AF)
I
: 1. 2L\F10 23 AF PMP->21 SF STP VLV
                        ,
: 2. 22AF10 23 AF PMP->22 SF STP VLV
: 3. 23AF10 23 AF PMP->23 SF STP VLV
: 4. 24AF10 23 AF PMP->24 SF STP VLV
* 5.
6.
21AF20 22 AF PMP->21 SF STP VLV 22AF20 22 AF PMP->22 SF STP VLV Appendix 5 Page 1 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FUNCTIONS A'.\L\LOG - CANA IAUXILIARY    FEEDWATER CONT'D                        (AF)
I
: 7. 23Af20 21 AF PMP->23 SF STP VLV I
: 8. 2-L\F20 21 AF PMP->24 SF STP VLV I
II  9. 2L\F23 21 STM GE:"J 2\UX FD STP CK I
110. 22AF23 22 STM GE\i AUX FD STP CK
: 11. 23AF23 23 STM GE'.'J AUX FD STP CK
: 12. 24AF23 24 STM GE'.'J AUX FD STP CK
: 13. 21  & 22AF92G CROSSTIE VALVE 1-L  .'\FWST LEVEL 115. 2MD216 AF BU FROM DEMIN WATER
* I I
I I
  !SERVICE WATER AND TAC l.
      '")
L.
* RIVER TEMPERATURE RIVER LEVEL (SW)
I I
I  3. 21ST27 21  ~1TLO  COOLER INLET I  4. 22ST27 22 MTLO COOLER INLET I
: 5. 21ST58 21 TAC HX SW IN VLV
: 6. 21ST58 22 TAC HX SW IN VLV
: 7. 21SW52 21 SW HDR TO 23 CFCU
: 8. 22SW52 22 SW HDR TO 23 CFCU
: 9. 23SW54 CFCU MANUAL ISOL. VLV I 10. 24SW76 CFCU MANUAL ISOL. VLV I
: 11. 21SW121 21    cc  HX SW IN VLV
                                                      --
: 12. 22SW121 22    cc  HX SW IN VLV
* 13.
14.
21SW161 SW SUCTION TO AFP 22SW161 SW SUCTION TO AFP Appendix 5 Page 2 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FUNCTIONS ANALOG - CANA ISERVICE  WATER AND TAC CONT'D                    (SW)
I 1.5. 21TC5 21 TAC P'.'1P DSC VLV                      -
: 16. 22TC5 22 TAC P'.'1P DSC VLV J17. 23TC5 23 TAC PMP DSC VLV
                                    ..
I 1s. 21TC10 21 TAC HX INLET    V.~LVE                  I
: 19. 22TC10 22 TAC HX I'.\JLET VALVE
: 20. PE~ETRATION  AREA SUMP DRAIN WASTE DISPOSAL                                    (WD)
: 1. 2WL15 RDCT PMP->WHUT STP VLV
: 2. 2WL50 LIQUID WASTE DISC . VALVE
* 3.
    .:l.
5.
21WL77 WHUT PMP 22WL77 WHUT PMP 23WL77 WHUT PMP sue sue sue VLV<-21WHUT VLV<-22WHUT VLV<-23WHUT                  I
: 6. 21WL86 WHUT PMP->2 WMHUT RCVLV
: 7. 2WL193 RCDT PMP->CVCS HVT VLV
: 8. 2WL278. RAD MON ISO VLV
: 9. AUX BUILDING SUMP LEVEL
: 10. WASTE HOLDUP & TANK ACTIVITY (N/S)
: 11. 21 GAS DECAY TANK PRESSURE
: 12. 21 GAS DECAY TANK    .~CTIVITY
: 13. 22 GAS DECAY TANK PRESSURE
: 14. 23 GAS DECAY TANK PRESSURE
: 15. 24 GAS DECAY TANK PRESSURE
* !CHEMICAL AND VOLUME CONTROL I
: 1. 2CV20 BYPASS AROUND CV18 Appendix 5 (CV)
I I
Page 3 of 35
 
SP-206
* SALEM SIMULATOR REMOTE FUNCTIONS ANALOG - CANA rHRMICAL AND VOLUME CONTROL CONT'D              (CV)
: 2. 2CV24 RC FILTER BYP VLV
: 3. 2CV26 MIXED BED OM INLET VLV
: 4. 2CV33 RC FILTER OUTLET VLV
                                ...
: 5. 2CV48 21 CHRG PMP DISC VLV I
: 6. 2CV53 22 CHRG PMP DISC VLV
: 7. 2CV64 23 CHRG PMP DISC VLV
: 8. 2CV73 SEAL INJ BYPASS VLV
: 9. 2CV149 Bl1.T PMP SUCT X-CONN VLV
: 10. 21CV155 21 BA FILTER INLET VLV
* 11.
12.
13.
22CV155 22 BA FILTER INLET VLV 21CV156 21 BA FILTER BYP.\SS VLV 22CV156 22 BA FILTER BYP-7\.SS VLV
: 14. 21CV157 21 BA FILTER OUTLET VLV
: 15. 22CV157 22 BA FILTER OUTLET VLV
: 16. 2CV174 MAN RAPID BORATE VLV I
: 17. 2CV182 BLENDER ISO VLV
: 18. 2CV184 BLENDER DISC TO RWST
: 19. 2CV197 SEAL RETURN TO CHG PMP SUCT
: 20. 2CV212 DEBORATING DM INLET VLV
: 21. 2CV225 CATION DEM IN BYPASS VLV
: 22. 2CV283 BA FILTER OUTLET _VLV
: 23. 2BR78 eves  HUT SLCT (0 TO 21 TNK)
* 24.
25.
2BR79 eves  HUT SLCT (0 TO 23 TNK) 21CV98 RCP SEAL INJ MAN ISOL
                                      }\.ppendix 5 Page 4 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FUNCTIONS ANALOG - CANA CHEMICAL AND VOLUME CONTROL CONT'D              (CV)
: 26. 22CV98 RCP SEAL INJ MAN ISOL
: 27. 23CV98 RCP SEAL I'.'JJ MAN ISOL 2s. 24CV98 RCP ,SEAL INJ MAN ISOL J
                                  .
: 29. 2CV130 SEJ'..L RETURN TO VCT
: 30. 21BR151 VCT RELIEF ISOL. VLV
: 31. 22BR151 VCT RELIEF ISOL. VLV
: 32. 23BR151 VCT RELIEF ISOL. VLV
: 33. 21 BORIC ACID TANK, BORON CONC.
: 34. 22 BORIC .\CID TA.NK, BORON CO'.'JC.
* 35.
36.
37.
PRIMARY WATER STOR2\GE TANK MASS MAKEUP WATER TO 21 BORIC ACID TANK MAKEUP WATER TO 22 BORIC ACID TANK
: 38. VCT PRESSURE CONTROLLER SETPOINT
: 39. MI~D'.!UM FLOW STOP FOR 2CV55
: 40. MINI:VlUM FLOW STOP FOR 23 CHG PMP IEMERGENCY    CORE COOLING                        (EC)
I
: 1. RWST MASS    (3.4E6 NORMAL)
: 2. 21SJ35 21 SI PMP DISC VLV
: 3. 22SJ35 22 SI PMP DISC VLV
: 4. 2SJ71 SI STOP VLV RESIDUAL HEAT REMOVAL/CONT. SP ARY              (RH}
: 1. 21RH12 21 RHR PMP HX BYPASS VLV
* 2.
3.
22RH12 21 RHR PMP HX BYPASS VLV 21RH14 21 RHR PMP HX INLET VLV Appendix 5 Page 5 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FUNCTIONS ANALOG - CANA I RESIDUAL    HEAT REMOVAL/CONT. SP ARY CONT'D      (RH)
I I
: 4. 22RH14 22 RHR PMP HX INLET VLV I
I  5. 21RH17 LETDOWN FRON RHR ISO VLV 6.
                                        .
22RH17 LETDOWN FRON THR ISO VLV
: 7. 2RH21 RHR DISCHARGE TO RWST
: 8. 21CS1 21 CONT SPY PMP SUCT VLV
: 9. 22CS1 22 CONT SPY PMP SUCT VLV
: 10. 21CS6 21 CONT SPY PMP DISC VLV I 11-'-.
I        22CS6 22 CONT SPY PMP DISC VLV
: 12. SPRAY ADDITIVE TANK LEVEL
* II ICONTAINMENT 1.
2.
RCDT COMPONENT INPUT LEAKOFF CONT2\IN'.'1ENT se:IP LEVEL (CN)
I.
I    3.  .\:IBIEXT  TE~PER2\TURE
: 4. A!"IBIE:JT PRESSURE
: 5. A:VIBIE:JT HUMIDITY IREACTOR      COOLANT                                (RC)
I
: 1. 2PS2 PZR SPRAY BYPASS VALVE
: 2. 2PS4 PZR SPRAY BYPASS VALVE IMISCELLANEOUS        SECONDARY                      (MC}
I
: 1. GENERATOR HYDROGEN PURITY
: 2. 2GC6 MAIN STM TO GLAND SEAL STM
: 3. 2GS14 AUX STM TO GLAND SEAL STM
* 4.  .:\UXILIARY STEAM PRESSURE Appendix 5 Page 6 of 35
 
SP-206 SALEM SIMULATOR
* jcoMPONENT COOLING REMOTE FUNCTIONS ANALOG - C.i\NA (CC)
I
: 1. 2WR114    ~IA.KEUP  TO CCW SURGE TANK
: 2. 21 cc    HX OUT TEMP SETPOINT
: 3. 22 cc    HX OUT TEMP SETPOINT
: 4. 21CC2 21      ccw  PMP DISC VALVE
: 5. 22CC2 22      ccw  PMP DISC VALVE
: 6. 23CC2 23      ccw  PMP DISC VALVE
: 7. 21CC15    cc  WATER TO 21 RHR HX
: 8. 22CC15    cc  WATER TO 22 RHR HX
: 9. 2CC66    LETDOW~    HX ISO VLV -
* 110 .
111.
12.
2CC72 LETDOWN HX ISO VLV 2CC143 2CC14.J:
ccw ccw SURGE TNK DRAIN SURGE TANK DRAIN
: 13. 21CC130 21 RCP THRM BARR ISO VLV
: 14.  *22CC130 22 RCP THRM BARR ISO VLV
: 15. 23CC130 23 RCP THRM BARR ISO VLV
: 16. 24CC130 24 RCP THRM BARR ISO VLV              '
1
: 17. 2CC134 THRM BARR COMMON ISOL VLV
                    *-
: 18. SPENT FUEL PIT HX HEAT SOURCE
: 19. B.A. EVAP HEAT SOURCE
: 20. WASTE EVAP HEAT SOURCE
: 21. SPARE
: 22. SPARE                                          -
* 23.
24.
SPARE SPARE Appendix 5 Page 7 of 35
 
SP-206 SALEM SIMUL\TOR
* REMOTE FUNCTIONS ANALOG - C.'\:JA
                                                    . (MS)
MAIN STEAM I  STEAM GENERATOR
: 1. 21MS9 21 STM GEN ATM ISO VLV
: 2. 22MS9 22 STM GEN STM ISO VLV
: 3. 23MS9 23 STM GEN ATM ISO VLV
                                    .
: 4. 24MS9 24 STM GEN ATM ISO VLV
: 5. 21MS45 21 STM GE?ll STM SUP-23 AFP
: 6. 23'.1S45 23 STM GEN STM SUP-23 AFP
: 7. 2L'!S30 STM DU'.v!P ISO VLV
: 8. 21MS32 STM DUMP ISO VLV
: 9. 2P1S34 STM DUMP ISO VLV
* 10.
jll.
12.
21MS36 ST'.1 DUMP ISO VLV 2PIS38 STM DUMP ISO VLV 21MS40 STM DUMP ISO VLV I
: 13. 22MS30 STM DUMP ISO VLV
: 14. 22MS32 STM DUMP ISO VLV
: 15. 22MS34 STM DUMP ISO VLV
: 16. 22MS36 STM DUMP ISO VLV
: 17. 22MS38 STM DUMP ISO VLV
: 18. 22MS40 STM DUMP ISO VLV
: 19. 21MS42 21 SGFP MAIN STM STP VLV
: 20. 22MS42 22 SGFP MAIN STM STP VLV
: 21. 21RS14 21 SGFP REHEAT STP VLV
: 22. 21RS14 22 SGFP REHEAT STP VLV
* 'PLANT ELECTRICAL I 1. GRID FREQUENCY (PE)
I I
Appendix 5 Page 8 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FUNCTIONS ANALOG - CANA
{PE)
  !jPLANT ELECTRICAL CONT'D I
I  2. GRID VOLTAGE
: 3. TI'.'1E DELAY FOR LOAD PICK l 1P _\FTER SYNC jcoNTAINMENT VENTILATION                            {VC)
                                      .                        I
: 1. 21 CF Ce HEP_\ FILT CAPA(0-100)%
: 2. 22 CFCU HEPA FILT CAPA(0-100)%
J
      ')
* 23 CFCU HEPA FILT CAPA(0-100)96
: 4. 24 CFCU HEPA FILT CAPA(0-100)90
: 5. 25 CFC"C HEP_\ FILT CAPA(0-100)"6 ICONTROL      AND STATION A.IR                      {CA)
I
* 1.
2.
INUCLEAR 2CA39 CONTROL AIR HDR ISO VLV 2Cl1.54 CONTROL AIR HDR ISO VLV INSTRUMENTATION                        {NI)
I HI FLUX AT SHUTDOWN I 1. SR                                                      I
  !SPDS INPUT                                          {SP)
I
: 1.    #21 REF JCT BOX TEMP T0087A
: 2.    #21 REF JCT BOX TEMP T0088A
: 3.    #22 REF JCT BOX TEMP T0089A
: 4.    #22 REF JCT BOX TEMP T0090A
: 5. AMBIE:'-JT TEMP 30 FT ELEV
: 6. DELTA TEMP 30 FT    - 300 FT ELEV
: 7. DELTA TEMP 30 FT    - 150 FT ELEV
: 8. WIND SPEED 30 FT ELEV
* 9.
j10.
WIND SPEED 150 FT ELEV WIND SPEED 300 FT ELEV Appendix 5 Page 9 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FUNCTIONS ANALOG - CANA llSPDS INPUT CONT'D                                  {SP)
I 111. WI~D  DIRECTION 30 FT ELEV
: 12. WIND DIRECTION 150 FT ELEV 113 . . WI0ID DIRECTION 300 FT ELEV
                                      ...
IVALVES    MANUAL CONTROL OVERRIDES                  {MX)
I
: 1.  .21BF19 :Li\NUA.L OVERRIDE POSITION
: 2. 22BF19 MANUAL OVERRIDE POSITION
: 3. 23BF19 '.1ANUAL OVERRIDE POSITION
: 4. 24BF19 MANUAL OVERRIDE POSITION
: 5. 21BF40 :1ANUAL OVERRIDE POSITION
* I 6.
7.
0 u
* 22BF40  :'1ANU~\L OVERRIDE POSITION 23BF40 :'.vlANUAL OVERRIDE POSITION 24BF.:+/-0 ~1ANUAL  OVERRIDE POSITION
* Appendix 5 Page 10 of 35
 
SP-206 SALEM SP1ULATOR
* I REMOTE FUNCTIONS DIGITAL - CDIG
  !MAIN TURBINE AND LUBE OIL                                        (MT)
                                                                  <
: l.    :--L\I :.J TlJRBI:'.'JE TUR'.'JDfG GEAR I
: 2.    :1AI:\i TURBI'.'JE TlJRNING GEAR MOTOR I
: 3. RESET TSI TROUBLE ALARM
                                                ...
: 4. RESET GEN STAT CLG SYS TRBL ALM l CONDENSATE        &  FEEDWATER                                {CF) l
: 1. 21C\T22 2L\ 22A HTR IN VLV-l1.uTO
                                                          -
: 2. 21C'.'J22 21A 22A HTR IN VLV-OPEN
      ')
      ..) . 22C:"J22 21B 22B HTR IN VLV-AUTO I
I
: 4. 22CN22 21B 228 HTR IN VLV-OPEN
* I  5. 23CN22 21C 22C HTR IN VLV-AUTO
: 6. 23C'.\I22 21C 22C HTR IN VLV-OPEN I 7.
I 21C:\:27 23A 24A 25A HTR IN VLV-l1.UTO I  8. 21C:>J27 23]\. 24A 25A HTR IN VLV-OPEN
: 9. 22C'.'!27 238 248 258 HTR IN VLV-AUTO
: 10. 22CN27 238 24B 258 HTR IN VLV-OPEN
: 11. 23CN27 23C 24C 25C HTR IN VLV-AUTO I
I
: 12. 23CN22 23C 24C 25C HTR IN VLV-OPEN
: 13. 21BF7 26A HTR CD INLET VLV-AUTO 114.      21BF7 26A HTR CD INLET VLV-OPEN
: 15. 22BF7 268 HTR CD INLET VLV-AUTO
: 16. 228F7 268 HTR CD INLET VLV-OPEN
: 17. 23BF7 26C HTR IN VLV-AUTO
* 18.
19.
23BF7 26C HTR* INLET VLV-OPEN 22AR22 COND VAC PMP V.i\LVE OPEN Appendix 5 Page 11 of 35
 
SP-206 SALE~! SIMULATOR
* REMOTE FUNCTIONS DIGIT_i\L - CDIG II CONDENSATE          FEEDWATER CONT'D                    (CF)
                      &
I 120. 23l1.R23 COND Vl\C PMP VALVE OPEN 1                                                                  I i AUXILIARY FEEDWATER                                      (AF)
I
: 1. 21 .i\FX FP A.NTI PUMP RESET II                                      .
: 2. 22 AUX FP _\NTI PUMP RESET
: 3. 23 AUX FP TRIP RESET IFIRE PROTECTION                                          {FP)
I
: 1. FIRE-21, 22, 23 CHG, SI, CSP EL 84'
: 2. FIRE-CONT. RCP 22 BEL. EL 130'
      ')
J
* FIRE *-:'-1ECHANICAL PEN ET AREA EL 78'
* 4.
5.
6.
FIRE-TURBPJE GEN. ARK\ S.EL 88' FIRE-RELAY ROOM FIRE-DIESEL GEN CONTROL ROOMS
: 7. FIRE-M2\IN TRANSFORMERS I    8. FIRE-NO. 22 DIESEL F.O. STG TK I    9. FIRE-:'.'JO. 22 FHB EXHAUST FAN
: 10. DELUGE-MAIN TRANSFORMERS
: 11. C02-NO. 22 DIESEL F.O. STG TNK 1112.      DELUGE-NO.      22 FHB EXHAUST FAN I
I  REACTOR COOLANT                                          {RC)
I
: 1. OT DELTA T TRIP CH I BS
: 2. OT DELTA T TRIP CH II BS
                                                            --
: 3. OT DELTA T TRIP CH III BS
* 4.
5.
OT DELTA T TRIP CH IV BS OT DELTA T RUN BACK CH I BS Appendix 5 Page 12 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FUNCTIONS DIGITAL - CDIG (RC)
II REACTOR COOLANT CONT'D I
I  6. OT DELTA T RUN BACK CH II BS I  7. OT DELTA T RUN BACK CH III BS II
: 8. OT DELT_l\ T RUN BACK CH IV BS
                                      .
: 9. OP DELTA T TRIP CH I BS
: 10. OP DELTA T TRIP CH II BS
: 11. OP DELT2\ T TRIP CH III BS
: 12. OP DELTA. T TRIP CH IV BS I  1J . OP DELTA T RUN BACK CH I BS
: 14. OP DELTA T RUN BACK CH II BS
* 115.
16.
17.
OP DELT.\ T Rl1N B.i\CK CH III BS OP DELT_i\ T RUN BACK CH IV BS LOW T.'\VG CH I BS I
I1 8 . LOW T.i\VG CH II BS
  ,19. LOW TAVG CH III BS 120. LOW TAVG CH IV BS
: 21. RE.i\CTOR COOL DRN TK PMP STl1.RT
: 22. REACTOR COOL DRN TK PMP ST.i\RT
  !REACTOR PROTECTION                                (RP)
I
: 1. R.i\CK-IN REACTOR .TRIP BYPASS BKR .'\
: 2. R.:\CK-IN REACTOR TRIP BYPASS BKR B
: 3. CLOSE REACTOR TRIP BYPASS BKR *A
: 4. CLOSE REACTOR TRIP BYP.i\SS BKR B
* 5.
6.
BKR TYING 2E 460V BUS TO ROD CONT BKR TYING 2G 460V BUS TO ROD CONT Appendix 5 Page 13 of 35
 
SP-206 Si\LEM SIMULATOR
* !REACTOR PROTECTION CONT'D REMOTE FUNCTIONS DIGITAL - CDIG
{RC)
                                                            !
: 7. 21 ROD DRIVE    MG SET
: 8. 22 ROD DRIVE    MG SET I 9. REACTOR TRIP TO l'\.UTO SI BLOCK P4 JUMPER
                                    .
IMISCELLANEOUS SYSTEMS                            (MC)
I
: 1. DEE'.'JERGIZE "A" SEC CABINET
: 2. DEENERGIZE "B" SEC Cl\.BINET        -
: 3. DEENERGIZE "C" SEC CABINET
: 4. SILENCE ALL AUDIBLE ALARMS
: 5. START TURBI:'.'JE OIL RES VAP EXTRACTOR
* 6.
IPLANT 1.
EN.i\BLE HOT SHUTDOWN P,i\NEL ELECTRICAL GE'.'JERATOR LOCKOUT RESET
{PE)
I
: 2.  "E" GROt'P BUS RESET ANTI-PUMP
: 3.  "F" GP.OU)? BUS RESET ANTI-PUMP
: 4.  "G" GROUP BUS RESET ANTI-PUMP
: 5.  "H" GROUP BUS RESET ANTI-PUMP
: 6. GP HTR PRIMARY/EMERGENCY KEY INTERLOCK
: 7. EP HTR PRIMARY/EMERGENCY KEY INTERLOCK
: 8. MAN. TRIP OF GP PRZR EMERG. FEED BRKR.
: 9. MAN. TRIP OF EP PRZR EMERG. FEED BRKR.
: 10. 500 KV 2-10 BKR LD REMOTE OPEN
: 11. 500 KV 2-10 BKR LD REMOTE CLOSE
* 12. 500 KV 9-10 BKR LD REMOTE OPEN Appendix 5 Page 14 of 35
 
SP-206 SALEM SIMUU\TOR
* REMOTE FUNCTIONS DIGITAL - CDIG
  !I PLANT ELECTRICAL CONT'D                        (PE)
I
: 13. STATUS OF NO. 1 GENERATOR
: 14. 500 KV 2-6 BKR CLOSE
: 15. 500 KV 5-6 BKR CLOSE
                                    .
: 16. 500 KV 1-5 BKR CLOSE
: 17. 500 KV 2-8 BKR CLOSE
: 18. 500 KV 1-8 BKR CLOSE
: 19. 500 KV 1T60 SWITCHER CLOSE
: 20. 13KV 4 TO 5 BKR
: 21. 13KV 1 TO 2 BKR
* !
22.
i 23.
2,L 13KV "L. TO 3 BKR 2A VITAL INST INVERTER SOLA BKR 2B VITAL I'.\IST INVERTER SOLA BKR
: 25. 2C VITAL  I~ST  INVERTER SOLA BKR                I
: 26. 2D VITAL INST INVERTER SOLA BKR
: 27. 21 ESS CNTRL INVERTER SOLA BKR
: 28. 22 ESS CNTRL INVERTER SOLA BKR
: 29. 23 EMERG LTG INVERTER SOLA BKR
: 30. COMPUTER INVERTER SOLA BKR jcoNTA.INMENT                                    (CN)
I
: 1. 21 CONT. SUMP PUMP AUTO
: 2. 21 CONT. SUMP PUMP START
: 3. 22 CONT . SUMP PUMP AUTO
* 4. 22 CONT. SU'.1P PUMP START Appendix 5 Page 15 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FUNCTIONS DIGITL\L - CDIG II CONTROL AND STATION AIR                          (CA)
    '~-. COMP #1 FIRST TO LOAD, #2 NEXT I  2. COMP #1 FIRST TO LOAD, #3 NEXT
: 3. COMP #2 FIRST TO LOAD, #1 NEXT
                                        .
: 4. COMP #2 FIRST TO LOAD, #3 NEXT
: 5. COMP #3 FIRST TO LOAD, #1 NEXT
: 6. COMP #3 FIRST TO LOAD, #2 NEXT
: 7.  #1 STATION AIR COMP AUTO
: 8.  #3 STATION AIR COMP AUTO I 9.    #1 STATION AIR COMP START
* 110.    # 3 ST_'\TION AIR COMP ST_i\RT
    !WASTE DISPOSAL
: 1. START WASTE GAS COMPRESSOR (WD)
I 2. START WASTE    ~ONITOR TEST    PUMP
  /I NUCLEAR  INSTRUMENTATION                          (NI)
I    1. DEFEAT PR N-41 TO AXIAL FLUX
: 2. DEFEAT PR N-42 TO AXIAL FLUX I 3. DEFEAT PR N-43 TO AXIAL FLUX I    4. DEFEAT PR N-44 TO AXIAL FLUX
: 5. N-41 PlO BISTABLE RESET
: 6. N-42 PlO BISTABLE RESET
: 7. N-43 PlO BISTABLE RESET
**
: 8. N-44 PlO BISTABLE RESET Appendix 5 Page 16 of 35
 
SP-206 I
S.:\LEM SI:HJLATOR I
* RE~OTE fCNCTIONS DIGIT_'i.L - CDIG I
    ~PRESSURIZER BISTABLES                                          (PR)
Ii
    !~ 1.
PZR HIGH PRESS RX TRIP CH I BS I
ii
        '1 L.
* PZR HIGH PRESS RX TRIP CH II BS i
II  J.
        ')
PZR HIGH PRESS RX TRIP CH III BS
                                            .
I I
        .1
        -.r. PZR HIGH PRESS RX TRIP CH IV BS I
I 5.        PZR LOW PRESS RX TRIP CH I BS
: 6.      PZR LOW PRESS RX TRIP CH II BS
: 7.      PZR LOW PRESS RX TRIP CH III BS I
Ii  8.      PZR LOW PRESS RX TRIP CH IV BS II 9      PZR LOW PRESS SI CH I BS I~~ -
* I 1 n . PZR 11-.;
1111 1~*
l -----
    !I 12.
lr-
                ~
p7R
                    .- LOW PRESS SI CH II BS
_._
LOW PRESS SI CH III BS PZR LOW. PRESS BLOCK SI CH I BS I
I
    !11 ')      PZR LOW PRESS BLOCK SI CH II BS
    ,~J.
I I
I jl4.      PZR LOW PRESS BLOCK SI CH III BS                            I I,  i:;
PZR HIGH LVL RX TRIP CH I BS ii~~.
lis.
I PZR HIGH LVL RX TRIP CH II BS J,17.      PZR HIGH LVL RX TRIP CH III BS II~1 8 . COMPARATOR LC460C LOW LVL TRIP I1 9        CO:VIP _\RA TOR LC460D HI LVL TRIP i "- .
1121      STEA..~  GEN BI STABLES                                (Sl)
I I    1
        -'-. 21 SG HI-HI LEVEL CH II BS
: 2.      21 SG HI-HI LEVEL CH III BS
                                                                *- -
** I I
J.
c1
* 21 SG HI-HI LEVEL CH IV BS 21 SG LO-LO LEVEL CH II BS Appendix 5 Page 17 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FUNCTIONS DIGIT.:'\.L - CDIG 1121  STEAM GEN BISTABLES CONT'D                      (Sl) i
: 5. 21 SG LO-LO LEVEL CH III BS
: 6. 21 SG LO-LO LEVEL CH IV BS
: 7. 21 SG LO LEVEL ( 2 596) CH III BS
                                      .
: 8. 21 SG LO LEVEL  ( 2 596) CH IV BS
: 9. 21 SG FF CH I SF/FF MISMATCH BS
: 10. 21 SG FF CH II SF /FF MIS:VIATCH BS 21 SG SF CH I SF/FF MISMATCH BS 111.
  *12. 21 SG SF CH II SF/FF MISMi\TCH BS
: 13. 21 SG HI STM FLOW CH I BS
* l*'L 15.
116.
21 SG HI STM FLOW CH II BS 21 SG STM LI:NE DIFF CH I BS 21 SG ST'.1 LINE DIFF CH III BS j 17. 21 SG STM LINE DIFF CH IV BS
: 18. 21 SG LOW PRESS SI CH IV BS j22 STEAM GEN BISTABLES                                (S2)
I
: 1. 22 SG HI-HI LEVEL CH I BS
: 2. 22 SG HI-HI LEVEL CH III BS
: 3. 22 SG HI-HI LEVEL CH IV BS I
      *L  22 SG LO-LO LEVEL CH I BS
: 5. 22 SG LO-LO LEVEL CH III BS
: 6. 22 SG LO-LO LEVEL CH IV BS
: 7. 22 SG LO LEVEL (25%)      CH III BS
* 8. 22 SG LO LEVEL ( 2 596) CH lV BS Appendix 5 Page 18 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FUNCTIONS DIGITAL - CDIG ij22 STEAM GEN BI STABLES CONT'D I
(S2)
I
: 9. 22 SG FF CH I SF/FF MISMATCH BS
: 10. 22 SG FF CH II SF/FF MISMATCH BS
: 11. 22 SG SF CH I SF /FF  MIS~IATCH BS
                                  ~
: 12. 22 SG SF CH II SF/FF MISMATCH BS
: 13. 22 SG HI STM FLOW CH I BS
: 14. 22 SG HI ST:.'1 FLOW CH II BS
: 15. 22 SG STM LINE DIFF CH I BS
: 16. 22 SG STM LINE DIFF CH II BS
: 17. 22 SG STM LINE DIFF CH III BS
* I
: 18. 22 SG LOW PRESS SI CH III BS 1123 STEAM GEN BI STABLES
: 1. 23 SG HI-HI LEVEL CH I BS
( S3)
I
: 2. 23 SG HI-HI LEVEL CH III BS
: 3. 23 SG HI-HI LEVEL CH IV BS I
: 4. 23 SG LO-LO LEVEL CH I BS
: 5. 23 SG LO-LO LEVEL CH III BS
: 6. 23 SG LO-LO LEVEL CH IV BS
: 7. 23 SG LO LEVEL (25%) CH III BS
: 8. 23 SG LO LEVEL (25%) CH IV BS
: 9. 23 SG FF CH I SF/FF MISMATCH BS
: 10. 23 SG FF CH II SF/FF MISMATCH BS
: 11. 23 SG SF CH I SF/FF MISMATCH BS
* 12.
13.
23 SG SF CH II SF/FF MISMATCH BS 23 SG HI STM FLOW CH I BS Appendix 5 Page 19 of 35
 
SP-206
* SALE:-1: SPHJLATOR RE~OTE    FUNCTIONS DIGITAL - CDIG j23 STEAM GEN BI STABLES CONT'D                              (SJ)
I II lL          23 SG HI STM FLOW CH II BS j15.        23 SG ST:VI LINE DIFF CH I BS I16.          23 SG STM LINE DIFF CH II BS I
                                                  ~
I 117.          23 SG STi"l LINE DIFF CH III BS                          II
: 18.        23 SG LOW PRESS SI CH IV BS 124 STEAM GEN BI STABLES                                      (S4)
I
: 1. 24 SG HI-HI LEVEL CH II BS
            ,,
: 6. 24 SG HI-HI LEVEL CH III BS I
    !
I i        3. 2 :1 SG HI-HI LEVEL CH IV BS I
*            ,,
i I        -:i:. 2 -d SG LO-LO LEVEL CH II BS                            I I
I I        5. 24 SG LO-LO LEVEL CH III BS I I I        6. 2.J SG LO-LO LEVEL CH IV BS Ij        7. 2 ;J SG LO LEVEL ( 2 596) CH III BS                      I I
: 8. 2-1 SG LO LEVEL    ( 2 596) CH IV BS I 9.
I 24 SG FF CH I SF/FF MISMATCH BS I
j10.          24 SG FF CH II SF/FF MISMATCH BS 1_J_ J_
            '
* 24 SG SF CH I SF/FF :!ISMATCH BS
: 12.        24 SG SF CH II SF/FF MISMATCH BS l1J.          2 -1,, SG HI STM FLOW CH I BS LL        24 SG HI STM FLOW CH II BS 115.            24 SG STM LI:JE DIFF CH I BS
: 16.        2 cl SG STM LINE DIFF CH II BS
**      17.
18.
24 SG STM LINE DIFF CH IV BS 24 SG\LOW PRESS SI CH IV BS Appendix 5 Page 20 of 35
 
SP-206 SALEM SPIFLATOR
* REMOTE FUKCTIONS DIGITAL - CDIG
                                                                            ,,
II EQUIPMENT TAG OUT                                        . (CT)
: 1. 1. 2RH1      CO~I. Sl'CT. ISOL. TAGGED OUT I    2. 2RH2      COM. SUCT. ISOL. TAGGED OUT I    3. 21SJ54 ACC. TNK OUTLT TAGGED OUT I    -L  22SJ54 ACC. TNK OUT LT TAGGED OUT I
I
: 5. 23SJ54      ~\CC. T>JK OUTLT TAGGED OUT
: 6. 24SJ54 .\CC. T:-!K OUT LT 'L\GGED OUT
: 7. 21S.J4.J SIS PU!'lP VALVE TAGGED OUT
: 8. 22SJ4,l SIS PUMP VALVE TAGGED OUT l
    !VALVES MANUAL CONTROL OVERRIDES                                (MX)
* i I
    !
I 11 1.
2.
          ')
          ~.
T_?\KE !IA\IUAL CO\TROL OF 21BF19 T_\KE '."!A)i"C AL    CO:\"TROL OF 22BF19 T_\KE :VIA:'-il'AL CONTROL OF 23BF19 I
I
          -L  T_\KE    ::VLi\:JUAL CONTROL Of 24BF19 II
: 5.            :VIA?\ UAL CONTROL OF 21BF40 I        TA.KE                                                        I II    6. TAKE :VIA'.'JUAL CONTROL OF 22BF40 II    7. TAKE      ~IAN  UAL CONTROL OF 23BF40                        I I
II    8. T.?\KE MANUAL CONTROL OF 24BF40
: 9.  ;"VJA'.'JUALLY OPEN 21SW20 TO 2 596 I
I    10.  :"IA\TALLY OPEN 22SW20 TO 2 596 I11.      MA?-JU.\LL Y OPEN 23SW20 TO 2 596
: 12.  ~lANUALLY          OPEN 24SW20 TO 2 596
**
Appendix 5 Page 21 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FUNCTIONS MONITORED VARIABLES
  !!REACTOR COOLANT SYSTEM                        (RC)
I  1. TAVE - T REF DEVIATION
: 2. RCS PRESSURE-PT-403
: 3. 21 RC LOOP T AVG
: 4. 22 RC LOOP T AVG 23 RC LOOP T AVG
[ s.
: 6. 24 RC LOOP T AVG
: 7. 21 RC LOOP TH
: 8. 21 RC LOOP TC 22 RC LOOP TH
* 22 RC LOOP TC 23 RC LOOP TH 23 RC LOOP TC 113. 24 RC LOOP TH 24 RC LOOP TC 21 RC LOOP FLOW 22 RC LOOP FLOW 23 RC LOOP FLOW 24 RC LOOP FLOW I
Jl 9. 21 RCP NO 1 SEAL LEAKOFF FLOW lr---~~~~~~~~~~~~~~~~~~~~-u j20. 22 RCP ~O 1 SEAL LEAKOFF FLOW
: 21. 23 RCP NO 1 SEAL LEAKOFF FLOW 22~  24 RCP NO 1 SEAL LEAKOFF FLOW
* 23.
24.
HOTTEST INCORE T/C TEMP.
SUBCOOLED ~ARGIN Appendix 5 Page 22 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FU~CTIONS
                                      ~ONITORED VARIABLES
    !I REACTOR COOLANT SYSTEM CONT'D                        (RC)
I I
125. .SUBCOOLED      :VIARGI~
I  26. RCS VOID FRACTIO>J I
127. RX HL\D    9o VOIDS I
I 23. RX VESSEL LEVEL
                                        ~
ICHEMICAL    VOLUME CONTROL SYSTEM                      (CV)
I
: 1. LETDOWN FLOW
: 2. CHARGI:\G FLOW (FE-128)
I I 3.
I 21 RCP SEAL I'.\'JECTION FLOW
: 4. 22 RCP SEAL L\I,JECTION FLOW                            I
*
: 5. 23 RCP SE}\L I'.\JECTIO'.\/ FLOW                          I I
I I
: 6. 24 RCP SE2\L I:\IJECTION FLOW I                                                                  I
: 7. REGEN HX CHARGI:'liG Ol'.TLET TEMP I                                                                  I
: 8. REGE}J HX LETDOWN INLET TE::'1P II
: 9. REGE'.'J HX LETDOWN OUTLET TEL"IP
: 10. LETDOWN HX OUTLET TEMP                        -        I I
111.      LETDOWN HX OUTLET PRESS 112.      ccw  OUTLET TEMP FROM LETDOWN HX I
: 13. 2CV35 VALVE POS 95DEVERTED
: 14. VCT TEMP.                                                i
: 15. VCT LEVEL LT-112 I
: 16. VCT LEVEL LT-114 I
: 17. VCT PRESS                                                I
* !19.
I
: 18. 21 22 eves eves HUT LEVEL HUT LEVEL Appendix 5 I
Page 23 of 35
 
SP-206 SALEM SIMUL\TOR
* REMOTE FCNCTIONS
                                        ~ONITORED VARIABLES I
I CHEMICAL      AND VOLUME CONTROL SYSTEM CONT'D              (CV) ij2o.      23 eves HUT LEVEL II PRESSURIZER                                                {PR)
Ji        1. PRZ PRESSURE I 2.          PRZ LEVEL (HOT CALIB.)
* I          3. PRZ LEVEL (COLD CALIB.}
: 4. PRZ LEVEL PROGRAM I          5. PRZ \'.\FOR TE~IP PRZ LIQUID  TE~lP PRZ SPRAYLI~E    TEMP.
* PRZ SPRAYLIXE FLOW il !,1~.-1*0_**~-P-P_.T_*_L_E_\_'E_L_*~~~~~~~~~~~~~~~~~~~~~~~~~~~~----;!1,
    ~          PRT PRESStTRE                                            .
  ~:::          PRT TE~PERATCRE                                          I FLOWRATE INTO PRT
: 14.      TEMP DOWNSTEAM PR-3 115.
1            TEMP DOWNSTEAM PR-4 i 16.        TEMP DOWNSTEAM PR-5 1----~~~~~~~~~~~~~~~~1
: 17.      TEMP DOWNSTEAM PORV'S COMPONENT COOLING/SERVICE WATER                              (CC)
I        1. 21 SW NUC HDR PRESS
: 2. 22 SW  ~UC HDR PRESS
* 3.
4.
TURB BLDG SW HDR PRESS 21 RCP THERMAL BARRIER OUT FLOW Appendix 5 Page 24 of 35
 
SP-206
                                              .SALEM SIMULATOR REMOTE FUNCTIONS
*
:'10NITORED VARIABLES COMPONENT COOLING/SERVICE WATER CONT'D                      {CC)
I    5. 22 RCP THER'.1AL BARRIER OlJT fLOW I    6. 23 RCP THERMAL BARRIER OUT fLOW
        '"7 I*  :H RCP THER;'-'IAL B.i'.\.RRIER OUT FLOW
: 8. 21 RCP :'."IOTOR COOLER OUTLET FLOW I          22 RCP '.10TOR COOLER OUTLET FLOW I    9.
I  10. 23 RCP ':'JOTOR COOLER OUTLET FLOW
: 11. 2 cl RCP :v!OTOR COOLER OUTLET FLOW
: 12. ccw  SURGE TANK LEVEL A
: 13. CCW SCRGE T}\NK LEVEL B 1 ,1 ccw  HX INLET TE:'1P
* J..ct
* 21
: 15. 21 er:\\' HX Ol!TLET TEMP
: 16. 22  ccw  HX  I~LET TEMP
: 17. 22  ccw  HX OCT LET TE'.'1P
  ,,RESID. HEAT REMOVAL/CONT. SPRAY                              (RH)
I 1
        -'-. 21 RHR PU'.'1P DISCHARGE FLOW
: 2. 22 RHR PU:'-'1P DISCHARGE FLOW
: 3. 21 RHR HX OUTLET TEMP I
: 4. 22 RHR RX OUTLET TEMP I    5. 21 RHR RX RHR FLOW I
I
: 6. 22 RHR HX RHR FLOW
: 7. 21 CONT SPR.i\Y HDR FLOW
: 8. 22 CONT SPRAY HDR FLOW
*
: 9. cs  ADDITIVE TANK LEVEL Appendix 5 Page 25 of 35
 
SP-206 SALEM SI'.'1lJLi\TOR
* REMOTE Fe~CTIONS
                                            '.'10~ITORED VARIABLES i EMERGENCY CORE COOLING                                          (EC)
I I    1. BIT FLOW
: 2. BIT DISCHARGE PRESSURE II
: 3. 21 COLD LEG INJECTION FLOW
        -L    ')
              ~6
                  ')
COLD LEG I:JJECTION Fi ow                    ~
I I
: 5. 23 COLD LEG INJECTION FLOW
: 6. 2 .,.,, COLD LEG I:'-JJECTION FLOW
: 7.    ') ')
              .:_,J  HOT LEG REC I RC FLOW
: 8. 24 HOT LEG REC I RC FLOW
: 9. RWST LEVEL
* 110.
I i
I 1  1
    .L -
112.
I I1 1
* 21 _\CCl"::Vll7L\TOR LEVEL 22 A.CClJ:"'.!ULATOR LEVEL 23 ACCl7:'1l"L\.TOR LEVEL l:l ~.
    ..L-::l:.
2 *J ACCF:1UL\TOR LEVEL 21 1\CCUMl'L\TOR PRESSURE
: 15.      22 ACCl'MUL\TOR PRESSURE 116.        23 .\CCUMULATOR PRESSURE
  ,17.        24 ACCUMULATOR PRESSURE I
I1 s .      21 SI PUMP DISCHARGE FLOW
: 19.      22 SI PUMP DISCHARGE FLOW IMALFUNCTION            FLOW RATES                                (MF)
I
: 1. 21 S/G PRI->SEC LEAK}\.GE
: 2. 22 S/G PRI->SEC LEAK.i\GE
*    .
        ')
J.
4.
23 S/G PRI->SEC LEAKAGE 24 S/G PRI -- > SEC LEAK.\ GE Appendix 5 Page 26 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FCNCTIONS
                                            ~ONITORED VARIABLES I
  !I MALFUNCTION FLOW RATES CONT'D                                (MF)
I
: 5. 21 RCP THERM. BARRIER LEAK I
I      6. 22 RCP THERM. BA.RR I ER LEAK I 7.      23 RCP THERM. BARRIER LEAK I
: 8. 2'-1 RCP THER::VI.      BARRIER LEAK                          I I                                                                        11 I .9 . LETDOW'.\" LI:'.'JE TO CONT . LEAK
: 10. NO'.\ REG EX HT EX TUBE LL\K 111.      PENE. BETWEE'.\I CV71        & CV68 LEAK
: 12. 21 MS LI:JE RUPTURE BEFORE ORIFICE I
113.      22 :vi: C' LI:'-iE RlJPTlTRE BEFORE ORIFICE LI
* I  *1 .1 23  ~1S    LI:\"E Rl'PTCRE BEFORE ORIFICE I -'-er *
  !
Jis.      24  '."JC' LI LI'.'JE RUPTURE BEFORE ORIFICE                    I I116.      21  :'-1S  LI'.'JE Rl'PTURE AFTER ORIFICE
: 17. 22    '."1S  LI\E RUPTURE AFTER ORIFICE I                                                                          I I is. 23    ~IS    LI:\JE RUPTURE AFTER ORIFICE I
119.      24 :VIS LI'.'JE RUPTURE AFTER ORIFICE 120.      :vlS BREAK A MIXING BOTTLE I  21. 21 SW HDR LEAK IN PENE ARK\
  ! 22. 22 SW HDR LEAK IN PENE AREA I
I 123.      21 SW HDR LEAK IN SW STRUCTURE 124.      22 SW HDR LEAK IN SW STRUCTURE                                  I I
: 25. SW LL\K INTO 23 CFCD
: 26. 21 SI ,\CCDMULATOR LEAK                              *,
* I 27.
I 2s.
i 22 SI ACCUMULATOR LEAK 23 SI .\CCUMULATOR LEAK Appendix 5 I
Page 27 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FUNCTIONS
                                    ~ONITORED VARIABLES 11 MALFUNCTION FLOW RATES CONT'D                    (MF)
I 129. 24 SI ACCCMULATOR LEAK I
    'I CONTAINMENT                                      (CN)
I
: 1. CONTAINMENT TEMPERATURE i
                                      .
CO>JT.\INMENT PRESSURE                              I
        ')
6.
I
: 3. CONTADJMENT HUMIDITY
: 4. CO>l"TAINMENT SlTMP LEVEL
: 5. CO.\'T'UNMENT [H2]
    '!AUXILIARY FEEDWATER                              (AF) i I  1. AFW STORAGE TANK LEVEL I
*
: 2.  ,\FW FLOW TO 21 SIG II  3. AFW FLOW TO 22 SIG I
II  -L  .\FW FLOW TO 23 SIG I
11  5. AFW FLOW TO 24 SIG I
I STEAM GENERATOR                                  {SG)
I
: 1.  ?1
            ~-1. SIG NARROW RANGE LEVEL
: 2. 22 SIG NARROW RANGE LEVEL I    3. 23 SIG NARROW RANGE LEVEL I
I 4. 24 SIG NARROW RANGE LEVEL I
I    5. 21 SIG STEAM FLOW I    6. 22 SIG STEAM FLOW
: 7. 23 SIG STEAM FLOW
: 8. 24 SIG STEAM FLOW
*-      9.
10.
21 SIG FEED FLOW 22 SIG FEED FLOW Appendix 5 Page 28 of 35
 
SP--206 SALEM SIMULATOR REMOTE FUNCTIONS
* ilSTEAM GENERATOR CONT'D MONITORED VARIABLES (SG)
I Ill.      23 SIG FEED FLOW I        24 SIG FEED FLOW 112.                                                                  I
: 13. 21 SIG WIDE RA:-IGE LEVEL
: 14.    ') ' )
            .:..c... SIG WIDE R.\NGE LEVEL.
: 15. 23 SIG \\"'IDE RA..NGE LEVEL I
: 16.    ') *1
            .w  '-:t SIG WIDE RANGE LEVEL 117. 21 STEAM GENERATOR PRESS I1 s .    ') ' )
c...c... STEAM GE:\IER.i\ TOR PRESS I
119.      23 STE_\:'-1 GENERATOR PRESS
*
: 20. 24 STEA;>1 GENERATOR PRESS
: 21. 21 SIG STE_\:Vl TEMP I
I 22 S/G STL\:Vl TEMP 1:::
II 23 S/G STEA:Vl TEMP                                          I I 2 ~.
I      i 24 SIG STK\M TEMP                                            I I
: 25. STL\:Vl DC:VIP    ( 96 OF FULL CAPACITY)
: 26. 21 S/G BLOWDOWN FLOW I ') 7 I ~... . 22 S/G BLOWDOWN FLOW
: 28. 23 S/G BLOWDOWN FLOW
: 29. 24 SIG BLOWDOWN FLOW ISECONDARY          SYSTEMS                                  (SS)
I
: 1. ::-:Li\IN CONDENSER BACK PRESSURE I    2. MAIN CONDENSER VACUUM I
*
: 3. 21 SGFP SUCT PRESS
        -L  22 SGFP SUCT PRESS Appendi::;: 5 Page 29 of 35
 
SP-206 SALEM SIMlJLATOR
* REMOTE FUNCTIONS MONITORED VARIABLES JI S~ONDCARY            SYSTEMS CONT'D                            (SS)  I I
i      5. 21 SGFP SPEED
: 6. 22 SGFP SPEED I
I                                                                          I I
I I      7.    '."IAIN STEA'."! PRESS PT-507
: 8. ST STEAM PRESS PT-506
                                                  .
: 9. 21 & 22 HJ HTR DI LET TEMP
: 10.        ' ) ')
6,J    Fi'" HTR I::JLET TE'."IP                    '
: 11.        ')
6-:t
                    ,, FW HTR l)JLET TE::VIP I1 2 .        25    f W  HTR INLET TEMP 113.          26 f\\' HTR I:'.'JLET TE::VIP
* 11 I
J._
1 j-c;
* I ...L....J
* 16.
26 FW HTR Ol'TLET TE"'IP 21A HOTWELL LEVEL 218 HOTWELL LEVEL I
: 17.        22A HOTWELL LEVEL                                            I
: 18.        228 HOTWELL LEVEL 119.          23A HOTWELL LEVEL I
120.          238 HOTWELL LEVEL                                            I 121.          212\ CIRC WATER BOX VACUUM
: 22.        21B CIRC WATER BOX V,\Cl:U:vi I
: 23.        22A CIRC WATER BOX VACUUM
: 24.        22B CIRC WATER BOX VACUUM
                                            '
: 25.        232\ CIRC WATER BOX VACUUM j26.          238 CIRC WATER BOX VACUUM
* I IMAIN TURBINE I LUBE OIL
: 1. GENERATOR OUTPUT,:::!W Appendix 5 (MT)
I I
Page 30 of 35
 
SP-206 SALEM SIMULATOR
* REMOTE FUNCTIONS MONITORED VARIABLES
    ~MAIN  TURBINE I LUBE OIL CONT'D                    (MT)
I 2.    !L\IN Tl:RBINE SPEED
: 3.  .:VIAI:\ Tt:RB OIL TEMP I  ,1
      -+/-
* GOV Vc\LVE POSITION 21:'1S29                          I
: 5. GOV VALVE POSITION 22MS29
: 6. GOV VALVE POSITION 23MS29
: 7. GOV VALVE POSITION 24MS29
: 8. MAI~    TURB BK\RINGS #09  TE~IP ERATURE
: 9.  :'IAIN TURB BK\RIXGS #10 TE::-1PERATURE I110.    .:VIAIX TCRB BEARINGS #11 TEMP ERL~ TURE I                                                            ,I
* 111. MAI\" Tl'RB BEARING.S #12 TEMPERATURE INUCLEAR      INSTRUMENTATION                      (NI}
i'I
: 1.  ::\41 REACTOR POWER                                  I
: 2.  :\'42  RL\CTOR POWER I    3.  :.; 4 3 RL\CTOR POWER II
: 4. N'44 RE2\.CTOR POWER I    5. IR CH I NEUTRON LEVEL I    6. IR CH II NEUTRON LEVEL
: 7. SR CH I NEUTRON LEVEL
: 8. SR CH II NEUTRON LEVEL
: 9. IR CH I SUR                                        I
: 10. IR CH II SUR
: 11. SR CH I SUR
* 12.
13.
SR CH II SlJR N41 DELT2\ I Appendix 5 I
Page 31 of 35
 
SP-206 S_i\LEM SIMULATOR
* REMOTE FUNCTIONS MONITORED VARIABLES
    !I NUCLEAR INSTRUMENTATION CONT'D                          (NI)
I 114.      :\I42 DELTA I 115.      N43 DELTA I I  16.  >J44 DELTA I I 17. DELTA I UPPER LIMIT 4
: 18. DELTA I LOWER LIMIT
: 19. LOc_i\LIZED FLUX NODE 1
: 20. LOCALIZED FLUX NODE 2 1::*      LOCALIZED FLUX );ODE 3
    ' ') 1 I  '"6
* LOCALIZED FLUX >JODE 4
* I
: 23. LOCALIZED FLUX NODE 5 2-L  LOCALIZED FLUX NODE 6 j2s.      LOC\LIZED FLl'X :\JODE 7 i 26. LOCALIZED FLUX NODE 8 I
i27.      Loc_:\LIZED FLUX '.'JODE 9 I128.      LOCALIZED FLUX NODE 10
: 29. LOCALIZED FLUX NODE 11
: 30. LOC"i\LIZED FLUX NODE 12 il REACTIVITY    CONTROL I ROD CONTROL                    .(RR)
I
: 1. CONTROL BANK A GROUP POSITION
: 2. CONTROL BANK B GROUP POSITION
: 3. CONTROL BANK  c GROUP POSITION
: 4. CONTROL BANK D GROUP POSITION                  -
* 5.
6.
RCS BORON CONC PZR BORON CONC Appendix 5 Page 32 of 35
 
SP-206 SALEM SIMULl1.TOR REMOTE FUNCTIONS
* REACTIVITY CONTROL MONITORED VARIABLES I ROD CONTROL CONT'D      (RR)
I  7. RX CORE XENON                                      I
: 8. CORE REACTIVITY IRADIATION    MONOTORING                          (RM)
I
                                    ~
: 1. 2RlA CONTROL ROOM AREA J 2. 2R2 CONTAINMENT I
: 3. 2R4 CHARGING PUMP ROOM
: 4. 2R7 IN-CORE SEAL TABLE
: 5. 2Rl O_l\ PERSONNEL HATCH EL 100
: 6. 2R10B PERSONNEL HATCH EL 130                        I
*
: 7. 2R34 MECH PENT .''I.REA EL 100
: 8. 2R42A 21 GAS DECAY TANK                            I
: 9. 2R42B 22 GliS DECAY TANK
: 10. 2R42C 23 GAS DECAY TANK
: 11. 2R42D 24 GAS DECAY TANK
: 12. 2R47 ELECT PENT AREA EL 78
: 13. 2R44A CONT POST LOCA HIGH RANGE
: 14. 2R44B CONT POST LOCA HI_GH RANGE
: 15. 2R24A 21 SEAL INJECTION FILTER
: 16. 2R24B 22 SEAL INJECTION FILTER
: 17. 2R25 SEAL WATER FILTER 18 . 2R26 REACTOR COOL.l\NT FILTER
: 19. 2R38 STM GEN SLOWDOWN FILTER
**  20.
21.
2R40 CONDENSATE FILTER 2R1B CONTROL ROOM INTAKE DUCT Appendix 5 Page 33 of 35
 
SP-206 SA.LEM SIMULATOR
* REMOTE FUNCTIONS MONITORED VARIABLES IRADIATION MONITORING CONT'D                      (RM)
I
: 22. 2R11A CONTAINMENT PARTICULATE
: 23. 2R12A CONTAINMENT NOBLE GAS
: 24. 2R12B CONTAINMENT IODINE
: 25. 2R13A 21 CFCU COOLING WATER
: 26. 2R13B 22 & 24 CFCU COOLING WATER
: 27. 2R13C 23 & 25 CFCU COOLING WATER
: 28. 2R15 CONDENSER AIR EJECTOR
: 29. 2R16 PLANT VENT GROSS
: 30. 2R17A COMPONENT COOLING
*
: 31. 2R17B COMPONENT COOLING
: 32. 2R18 LIQUID Wl\STE DISPOSAL
: 33. 2Rl9A 21 STEAM GENERATOR SLOWDOWN
: 34. 2R19B 22 STEAM GENERATOR SLOWDOWN
: 35. 2R19C 23 STEAM GENERATOR SLOWDOWN        '
: 36. 2R19D 24 STEAM GENERATOR SLOWDOWN
: 37. 2R31 LETDOWN FAILED FUEL 138. 2R35 STEAM GENERATOR SLOWDOWN FILTER
: 39. 2R41A PLANT VENT PARTICULATE
: 40. 2R41B PLANT VENT IODINE
: 41. 2R41C PLANT VENT NOBLE GAS
: 42. 2R45A-PLANT VENT
: 43. 2R45B PLANT VENT
**  44.
45.
2R45C PLANT VENT 2R45D PLANT VENT Appendix 5 Page 34 of 35
 
SP-206 SALEM SIMULATOR REMOTE FUNCTIONS
* IRADIATION      MONITORING CONT'D MONITORED VARIABLES (RM)
I
: 46. 2R46A 22 STEAMLINE MONITOR j47. 2R.:l6B 24 STEA.ML I NE MONITOR                      I I
I
: 48. 2R46C 21 STEAMLINE MONITOR
: 49. 2R46D 23 STEl1.MLINE '.'10NITOR 150. 2R46E COMMON DISCHARGE OF R46A-D 1
SQUARE ROOT METER FLOW (ANS TESTING)                (SQ}
: 1. RHR COOLDOWN REC I RC FLOW
        "' . 21 RHR INJECTION FLOW
        ')
: 3. 22 RHR INJECTION FLOW
  *
: 4. 21 RHR    ccw OLTTLET FLOW I
I
: 5.  ') ' )
              ~LJ    RHR ccw OUTLET FLOW                          I I
I
: 6. CO>TTAINME:\"T SPA.RY ADD. TANK FLOW
: 7. CHG. PUMP DISCHARGE (BIT) FLOW IMISCELLANEOUS                                        (MS)
I
                                                          -
I                                                            I
,'*.'
Appendix 5 Page 35 of 35
 
SP-206 HOPE CREEK & SALEM SIMULATOR Station Procedure Performance Database
* All plant operating procedures located in the simulator are performed to evaluate the ability to accomplish each on the simulator, the evaluation includes all steps of the procedure performed in the control room, and those steps performed in-plant for which REMOTE FUNCTIONS are provided.
Any procedural step performed in-plant for which a REMOTE FUNCTION is not provided is assumed to be satisfactorily completed.
All Integrated Operating Procedures, and the System Operating Procedures required to support them are performed and evaluated in conjunction with the Demonstration of Normal Operations (Appendix 10). Those procedural steps not performed or not accomplished in accordance with this demonstration, and all other procedures are performed and evaluated individually.
The results of the evaluation of each procedure are maintained in the Simulator vs Station Procedure Database, identifying any limitations encountered with the execution of the identified procedure.
All procedural differences are identified in the associated Station Procedural Performance Database and evaluated for training impact and assigned one of the following status codes by the Simulator Performance Engineer:
N    None        All steps in the procedure can be performed in the
* simulator .
s    Slight      Some steps in the procedure can not be performed in the simulator either because system/component is not simulated or system/component is outside the control room. Performance of this procedure will result in no operator error or equipment failure.
M    Moderate    Some steps in the procedure can not be performed in the simulator either_ because system/component is not simulated or system/component is outside the control room. Performance of this procedure may result in operator error or equipment failure.
L    Large        Can not perform critical steps of this procedure on the simulator.  (operator error or equipment failure is likely) .
The database contains the following fields:
Procedure number:    identifies the procedure performed.
Revision:  the latest revision evaluated.
ACN:  Advanced Change Notice.
*
 
== Description:==
the procedure title.
Simulator vs Reference Plant:    a description of any limitations encountered during the performance of the procedure}.
Appendix 6                  Date: 08/04/89 Page 1 of 2                Rev.: ~--=o'--~-
 
SP-206 SAT:            All steps performed from the control room can be accomplished.
* N/S:
LOCAL:
DELETED:
Not simulated. The evolution performed is beyond the scope of simulation.
All evolutions performed are either local manipulations or observations.
The identified procedure has been deleted by the initiating department.
Unit 1 vs Unit 2:    (Salem only) a description of any differences between Unit 1 and Unit 2.
VALIDATED:    overall assessment of the procedure.
IMPACT:  Impact assessment as assigned by Simulator Performance Engineer.
All revisions to the identified procedures are reviewed and evaluated by the Simulator Configuration Engineer and/or Simulator Performance Engineer to determine limitations encountered.
If the revision incorporated an editorial or organizational change with no impact on the execution of the procedure the revision number in the Station Procedure Performance Database is changed to reflect the higher revision .
* If the revision incorporated a change that alters the method of performance, the affected sections of the procedure are performed and re-evaluated. The results are entered in the appropriate fields of the Station Procedure Performance Database.
If the procedural change is initiated as a result of a station modification. the procedure will be made available for training. The DCP number will be entered in the database until the modification is incorporated into the simulator. At that time the entire procedure will be re-evaluated and the Station Procedure Performanc~ Database updated.
Appendix 6                  Date: 08/04/89 Page 2 of 2                Rev.: _ _.oo___
 
                                        -                                        -------------~------
Page No.        2 12/27 /89 SALEM SIMULATOR
* PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT UNIT 1 vs UNIT 2      VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-4.0. 5V-DA-6      01      INSERVICE TESTING - VALVES      N/S                          NONE                            N DIESEL AUXILIARIES 2-4. 0. 5V-MAINT    01      INSERVICE TESTING - VALVES      N/S                          NONE                            N MAINTENANCE 2-4.0.5V-MISC-1    03 01 INSERVICE TESTING - VALVES        COS 2-1 N/S                  NONE                SAT        N MISCELLANEOUS 2-4.0.5V-MS-1      01 02 INSERVICE TESTING - VALVES        NONE                          NONE                SAT MAIN STEAM AND BOILER FEED 2-4.0.5V-MS-5      01 01 INSERVICE TESTING VALVES MAIN COS 3 H/S                        NOHE                SAT        s STEAM AND BOILER FEED 2-4.0.5V-RC-5      00      INSERVICE TESTING - VALVES      DELETED                      DELETED                        N REACTOR COOLAHT
* 2-4.0.5V-RH-1      04 01 INSERVICE TESTING - VALVES        NONE                          NONE                SAT RESIDUAL HEAT REMOVAL 2-4.0.5V-RH-4      00 01 INSERVICE TESTING - RESIDUAL                                    9/13/89 - NO UNIT    SAT HEAT REMOVAL                                                  DIFFERENCES 2-4. 0. 5V-RH-6    01 01 INSERVICE TESTING - VALVES        N/S                          NONE                            N RESIDUAL HEAT REMOVAL 2-4.0.5V-ROOM      02      INSERVICE TESTING - ROOM        N/S                          UNIT I ONLY CHECKS              N COOLERS                    COOLERS                                                      12CS PUMP AND 12 RHR PUMP ROOM COOLERS MODULATING VALVES UNIT II CHECKS ALL ROOM COOLER MODULATING VALVES 2-4.0.5V-RPI-AB    00 02 IST - REMOTE POSITION            N/S                          NONE                            N VERIFICATION - AUX BLDG 2-4.0.SV-RPI-CONT  00 02 IST - VLVS REMOTE POSTION        N/S                          UNIT II TESTS                  N INDICATION VERIFICATION TEST                                  21-24SJ54's UNIT I CONT                                                          DOES NOT
~ 2-4.0.5V-RPI-MD5    00 02 IST - REMOTE POSITION            N/S                          NONE                            N VERIFICATION - COLD SHUTDOWN
 
l Page No.                                                                                                                            I 12/27/89                                                                                                                            I I
SALEM SIMULATOR                                                          I
* PROCEDURE LIST - UNIT 1 &UNIT 2 I
SORTED BY PROCEDURE NUMBER I
PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-4.0.5V-RPI-PEN    00 02 IST - REMOTE POSITION            N/S                          NONE                            N VERIFICATION - PENETRATION AREA 2-4.0.5V-RPI-SW    00      IST - VLVS REMOTE PST          N/S                          NONE                            N INDICATION VERF TEST SVR WTR BLDG 2-4.0.5V-SJ-1      04 03 INSERVICE TESTING - VALVES -      COS 2-1 N/S                  NONE                SAT        s SAFETY INJECTION 2-4.0.5V-SJ-3      00 01 INSERVICE TESTING - VALVES -      NONE                          NONE                SAT SAFETY INJECTION 2-4.0.5V-SJ-5      01 03 INSERVICE TESTING - VALVES -      COS 2-1 N/S                  NONE                SAT SAFETY INJECTION
* 2-4.0.5V-SJ-6      01      INSERVICE TESTING - VALVES      DELETED                      DELETED SAFETY INJECTION 2-4.0.5V-SS-1      00 01 INSERVICE TESTING - VALVES        NONE                          NONE                SAT SAMPLING SYSTEM 2-4.0.5V-SW-1      02      INSERVICE TESTING - VALVES      NONE                          UNIT I HAS          SAT SERVICE WATER                                                INSTRUCTIONS FOR BACKWASHING 12 COMPONENT COOLING HEAT EXCHANGER.
2-4.0.5V-SW-5      00      INSERVICE TESTING - VALVES      NONE                          UNIT II DIRECTS      SAT SERVICE WATER                                                OPERATOR TO OPEN 2SW26 UNIT I DOES NOT 2-4.0.5V-SW-5A      00      INSERVICE TESTING -SW79 VALVES N/S                            NONE                            N 2-4.0.5V-VC-1      00 01 INSERVICE TESTING - VALVES        NONE                          NONE                SAT CONTAINMENT VENTILATION 2-4.0.5V-VC-5      00 01 INSERVICE TESTING - VAVLES        N/S                          NONE                            N CONTAINMENT VENTILATION
* 2-4.05V-RPI-AB      00      IST - VLVS REMOTE PST          N/S                          NONE                            N INDICATION VERF TEST AUX BUILDING
 
Page No.
12/27/89 SALEM SIMULATOR
* PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-4.05V-RPI-AB      00      IST - VLVS REMOTE PST          N/S                          NONE                            N INDICATION VERF TEST AUX BUILDING 2-4.1.2.lA          02 01 INSERVICE TESTING - SAFETY        N/S                          NONE                            N INJECTION 2-4 .1. 2. lB      04 02 REACTIVITY CONTROL SYSTEMS -      NONE                          UNIT II LINE-UP      SAT BO RATION                                                    ALLOWS AFLOW PATH THROUGH THE BIT UNIT I DOES NOT 2-4.1.2.2D          02      BORATION FLOW RATE TEST        NONE                          UNIT II ONLY        SAT PROCEDURE 2-4.1.2.5A          03 02 REACTIVITY CONTROL SYSTEM -      NONE                          UNIT II ONLY        SAT BORATED WATER SOURCES                                        PROCEDURE
* 2-4.1.3.1.2        02 02 REACTIVITY CONTROL SYSTEM -      NONE                          9/21/89 - NO UNIT    SAT ROD CONTROL ASSEMBLIES                                        DIFFERENCES 2-4.2.1.1          02 01 POWER DISTRIBUTION - AXIAL        NONE                          9/21/89 - NO UNIT    SAT FLUX DIFFERENCE                                              DIFFERENCES 2-4.2.1.1          02      POWER DISTRIBUTION - AXIAL      NONE                          NO UNIT DIFFERENCES SAT FLUX DIFFERENCE 2-4.2.3.3          00      REACTOR COOLANT SYSTEM FLOW    N/S                          UNIT 2 ONLY                    N RATE CALCULATION                                              PROCEDURE 2-4.2.4.1          01 . POWER DISTRIBUTION - QUADRANT NONE                            NO UNIT DIFFERENCES. SAT POWER TILT RATIO                                              UNIT 1 PROCEDURE NUMBER IS 4.2.4 2-4.3.1.1.1        00      REACTOR COOLANT PUMP STATUS    NONE                          NONE                SAT        N INDICATION TEST 2-4.3.2.l(A)l      00 02 ENGINEERING SAFETY FEATURES - N/S                              NONE                            N MANUAL SAFETY INJECTION - SSPS 2-4.3.2.l(A)2      00 03 ENGINEERING SAFETY FEATURES - N/S                              UNIT II ONLY                    N SEC SECTION - VITAL BUS 2A                                    PROCEDURE
* 2-4.3.2.l(A)J      00 03 ENGINEERING SAFETY FEATURES - N/S                              UNIT II ONLY                    N MANUAL SI - SEC SECTION 2B                                    PROCEDURE
 
                        - --------                                        -----------------------
Page No.
12/27/89 SALEM SIMULATOR
* PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-4.3.2.l(A)4      00 03 ENGINEERING SAFETY FEATURES - N/S                              UNIT II ONLY                    N MANUAL SI - SEC SECTION 2C                                    PROCEDURE 2-4.3.2.l(A)5      00      ENG SAFETY FEATURES - MANUAL  N/S                            NONE                            N SI - TURB TRIP ASEC BLOCK VERF 2-4.3.2.l(B)        02 01 ENGINEERED SAFETY FEATURES -    N/S                            UNIT I PROCEDURE                N CONTAINMENT ISOLATION                                        NUMBER IS 4.3.2.l[B) 2-4. 3. 2. l(C)    01 01 ENGINEERED SAFETY FEATURES -    N/S                            UNIT I LISTS                    N CONTAINMENT ISOLATION PHASE                                  LOCATION OF JUMPERS "A"                                                          WHICH MUST BE INSTALLED TO ALLOW OPENING OF CV3, CV4
* AND CV5, UNIT II DOES NOT. UNIT I PROCEDURES NUMBER IS 4.3.2.1.l(C) 2-4.3.2.l(D)                ENGINEERED SAFETY FEATURES -  NONE                          UNIT 1 PROCEDURE    SAT STEAMLINE ISOLATION                                          NUMBER IS 4.3.2.1.l(D) 2-4.3.2.l(E-A)      03 09 ENGINEERED SAFETY FEATURES -    N/S                            PROCEDURES ARE                  N SSPS SLAVE RELAY TEST TRAIN                                  SPECIFIC FOR EACH "A"                                                          UNIT. UNIT I PROCEDURE NUMBER 4.3.2.11.(EB) 2-4.3.2.l(E-A)-1    00 01 ENGINEERED SAFETY FEATURE -      DELETED                        DELETED SSPS SLAVE RELAY TEST TRAIN "A"
2-4.3.2.l(E-B)      04 10 ENGINEERED SAFETY FEATURES - N/S                                NONE                            N SSPS SLAVE RELAY TESTS TRAIN B 2-4.3.2.l[E-B)-l    01      ENGINEERED SAFETY FEATURE -    DELETED                        DELETED SSPS SLAVE RELAY TEST TRAIN "B"
* 2-4.3.2.1.3        02 02 ENGINEERED SAFETY FEATURES -    N/S                            NONE                            N
 
Page No.      6 12/27/89 SALEM SIMULATOR
* PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
RESPONSE TIME TESTING 2-4.3.3.5          01      INSTRUMENTATION - REMOTE        N/S                          NONE                            N SHUTDOWN PANEL 2-4.3.3.7          03 03 INSTRUMENTATION - POST            N/S                          NONE                            N ACCIDENT MONITORING 2-4.3.3.8          03 02 RADIATION MONITORING - SOURCE CANNOT SOURCE CHECK RMS          PROCEDURES ARE                  s CHECKS                          MONITORS FROM SIMULATOR      COMPLETELY DIFFERENT. UNITS HAVE DIFFERENT RADIATION MONITORING SYSTEMS. CANNOT SOURCE CHECK R45 MONITORS FROM SIMULATOR.
* 2-4.3.4.2          02      TURBINE OVERSPEED PROTECTION    NONE                          UNIT II ONLY        SAT PROCEDURE 2-4.4.1.2.1        03      REACTOR COOLANT SYSTEM - RCP    NONE                          NONE                SAT STATUS 2-4.4.4.3          03 01 PRESSURIZER HEATERS              SIMULATOR CANNOT PERFORM      MINOR DIFFERENCES              s REMOTE FUNCTIONS              WHICH DO NOT AFFECT PERFORMANCE OF PROCEDURE.
2-4.4.7.2          02 01 UNIDENTIFIED/NOW-IDENTIFIED      NONE                          UNIT 1 PROCEDURE IS SAT LEAK RATE DETERMINATION                                      NUMBERED 4.4.6.2 2-4.4.7.2(D)l      00      EMERGENCY CORE COOLING SYSTEM N/S                            NONE                            s
                              - ECCS SUBSYSTEMS 2-4.4.7.2.1        03      EMERGENCY CORE COOLING SYSTEM N/S                            PROCEDURES ARE                  s
                              - ECCS SUBSYSTEMS                                            SPECIFIC FOR EACH UNIT. UNIT 1 PROCEDURE IS NUMBERED 4.4.6.3 2-4.4.7.2.lD        01 01 EMERGENCY CORE COOLING SYSTEMS N/S                              UNIT 2 ONLY                    N
                              - ECCS SUBSYSTEMS                                            PROCEDURE
* 2-4.4.7.2C          02 01 REACTOR COOLANT SYSTEMS -        NONE                          NO UNIT DIFFERENCES. SAT
 
                                                                                                                                    - 1 Page No. 7 12/27/89 SALEH SIMULATOR
* PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2      VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
CONTROLLED LEAKAGE MEASUREMENT                                  UNIT 1 PROCEDURE IS NUMBERED 4.4.6.2.C 2-4.4.7 .2D        03 01 REACTOR COOLANT SYSTEM - WATER NONE                            NO UNIT DIFFERENCES. SAT INVENTORY BALANCE                                              UNIT 1 PROCEDURE IS NUMBERED 4.4.6.2D 2-4.5.lB            02 01 EMERGENCY CORE COOLING -          N/S                          NONE                            S ACCUMULATORS 2-4.5.2B            03 01 EMERGENCY CORE COOLING - ECCS N/S                              NONE                            N SUBSYSTEMS 2-4.5.2C            03      EMERGENCY CORE COOLING - ECCS N/S                            NONE                            N SUBSYSTEMS 2-4.5.2D            01      EMERGENCY CORE COOLING - ECCS N/S                            NONE 89 - NO UNIT              N
* SUBSYSTEM CONTAINMENT SUMP                                    DIFFERENCES N/A SIMULATOR 2-4.5.2G            03 01 EMERGENCY CORE COOLING - ECCS N/S                              NONE                            N THROTTLE VALVES 2-4.5.2H            02 01 THROTTLING VALVE FLOW BALANCE N/S                              WHEN TESTING SAFETY            N VERIFICATION                                                  INJECTION PUMP MINIMUM FLOW FOR UNIT 1 IS 435 GPM MINIMUM FLOW FOR UNIT 2 IS 463 GPM. UNIT 2 HAS ACTUATION TO INSURE LOOP FLOWS ARE WITHIN 5 GPM OF ONE ANOTHER.
WHEN TESTING CENTRIFUGAL CHARGING PUMPS UNIT 1 HAS CONTROL PRESSURIZER LEVEL USING 1RH21, THERE ALSO IS ACAUTION THAT IF 1RH21 FAILS
* AND CANNOT BE CLOSED CLOSE RH19's AND RH20.
 
Page No.
12/27/89 SALEM SIMULATOR
* PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-4.5.3.1          03 01 EMERGENCY CORE COOLING - ECCS NONE                              UNIT DIFFERNECES    SAT SUBSYSTEMS                                                    UNIT 2 HAS ASTEP TO VERIFY 2SJ1 AND 2SJ2 OPERABLE. UNIT 1 DOES NOT 2-4.5.4.1          03      EMRGENCY CORE COOLING - BORON DELETED                        DELETED INJECTION TANK 2-4.5.4.2A          04      EMERGENCY CORE COOLING - VITAL N/S                            NONE                            s HEAT TRACING 2-4. 6.1.1. lAl    04      CONTAINMENT SYSTEMS - PRIMARY N/S                            NONE                            N CONTAINMENT II 2-4.6.1.1.1A2      04      CONTAINMENT SYSTEMS - PRIMARY N/S                            NONE                            N
* 2-4.6.1.3A 2-4. 6.1. 3C        05 CONTAINMENT I 08 01 CONTAINMENT - AIR LOCKS          N/S CONTAINMENT SYSTEM - AIR LOCKS N/S NONE NONE N
N 2-4.6.1. 7          03      CONTAINMENT SYSTEM - PURGE    CANNOT ISOLATE AIR TO VALVES  NONE                SAT        s SUPPLY &EXHAUST ISOLATION      ON SIMULATOR VLVS 2-4.6.2.lA          05      CONTAINMENT SYSTEM - SPRAY    N/S                            NONE                            N SYSTEM 2-4.6.2.lC          01      CONTAINMENT SYSTEM - SPRAY    N/S                            UNIT I PROCEDURE                N SYSTEM                                                        NUMBER IS 4.6.2.lB 2-4.6.2.2B          02      CONTAINMENT SYSTEM - SPRAY    N/S                            NONE                            N ADDITIVE 2-4.6.2.2D          04 01 CONTAINMENT SYSTEM - SPRAY      N/S                            NONE                            N ADDITIVE 2-4.6.2.3A          03 01 CONTAINMENT SYSTEM - COOLING    NONE                          NONE                SAT SYSTEM
* 2-4.6.2.3B          00      CONTAINMENT SYSTEM - COOLING  NONE                          NONE                SAT SYSTEM
 
                                                                                --------------
Page No.      9 12/27/89 SALEM SIMULATOR
* PROCEDURE NUMBER              REV ACN DESCRIPTION PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-4.6.3.2.lB        03 01 CONTAINMENT SYSTEM -              N/S                          NONE                            N CONTAINMENT ISOLATION 2-4.7.1.2A          04      PLANT SYSTEMS - AUXILIARY      N/S                          NONE                            N FEED WATER 2-4.7.1.2B          07 01 PLANT SYSTEMS - AUXILIARY        N/S                          NONE                            N FEEDWATER 2-4.7.1.2C          03 01 PLANT SYSTEMS - AFWST TO EACH NONE                              NONE                SAT STEAM GENERATOR 2-4.7.1.3.2        02 01 PLANT SYSTEMS - AUXILIARY FEED N/S                              UNIT 2 MUST EVALUATE            N APPLICABILITY OF L.C.O. 3.7.1.3 ACTION B
* 2-4.7.1.3.4        00      AUXILIARY FEEDWATER SYSTEM      N/S                          UNIT 2 ONLY                    N PROCEDURE 2-4.7.1.5          03      MAIN STEAM ISOLATION VAVLE      NONE                          NONE                SAT EMERGENCY CLOSE TIME RESPONSE 2-4.7.3.l          02      PLANT SYSTEMS - COMPONENT      NONE                          NONE                SAT COOLING 2-4.7.4A            01      PLANT SYSTEMS - SERVICE WATER N/S                            UNIT 1 PROCEDURE NUMBER 4.7.4.lA 2-4.7.6.l(D-2)      04 01 PLANT SYSTEMS - CONTROL ROOM      DR 89-217 AND 89-218          PROCEDURE IS UNIT UN SAT        s VENTILATION                                                  SPECIFIC DUE TO DIFFERNECES BETWEEN UNIT 1 AND UNIT 2 RADIATION MONITORING SYSTEMS 2-4.7.6.lA          04      PLANT SYSTEMS - CONTROL ROOM    N/S                          NONE                            N VENTILATION 2-4.7. 7A          01 01 PLANT SYSTEMS - AUXILIARY        NONE                          UNIT 1 PROCEDURE    SAT BUILDING VENTILATION                                          NUMBER 4.7.7.lA
* 2-4.8.1.1.lA        05      ELECTRICAL POWER SYSTEMS -      NONE                          UNTI 1 HAS ABREAKER SAT ALIGNMENT                                                    ALIGNMENT THAT MUST BE MAINTAINED,
 
Page No.      10 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT UNIT 1 vs UNIT 2      VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
UNIT 2 JUST SPECIFIES TRANSFORMERS 2-4.8.1.1.lB        02      ELECTRICAL POWER SOURCES - BUS ONLY MANUAL BUS TRANSFER IS    NONE                SAT TRANSFER                        APPLICABLE TO SIMULATOR 2-4.8.1.1.2        08 03 ELECTRICAL POWER SYSTEMS -        N/S                          PROCEDURES ARE                  N EMERGENCY DIESELS                                            SLIGHTLY DIFFERENT BUT ACCOMPLISH THE SAME TASK 2-4. 8.1.1. 2{Cl)  02      AC SOURCES - DIESEL INSPECTION N/S                            UNIT 1 PROCEDURE                N NUMBER IS 4.8.1.1.2(Bl) 2-4.8.1.1.2[C7Al    00 02 DIESEL GENERATOR ENDURANCE RUN N/S                              UNIT 2 ONLY                    N
*-                            &LOAD REJECTION TEST                                          PROCEDURE 2 4.8.1.1.2[C7B)    00 01 2B DIESEL GENERATOR ENDURANCE N/S                              UNIT 2 ONLY                    N RUN &LOAD REJECTION TEST                                      PROCEDURE 2-4.8.1.l.2[C7C)    00 01 2C DIESEL GENERATOR ENDURANCE N/S                              UNIT 2 ONLY                    N RUN AND LOAD REJECTION                                        PROCEDURE 2-4.8.1.1.2D        02      ELECTRICAL PWR SYS - DIESEL    N/S                          UNIT 2 ONLY                    N GENE SIMULTANEOUS STARTING                                    PROCEDURE 2-4.8.l.1.3A        04 01 ELECTRICAL POWER SYSTEMS -        N/S                          NONE                            N DIESEL FUEL OIL 2-4.8.2.1          02      ELECTRICAL POWER SYSTEMS - AC N/S                            UNIT 1 AND UNIT 2              N DISTRIBUTION                                                  HAVE DIFFERENT VITAL INSTRUMENT INVERTERS PROCEDURE IS UNIT SPECIFIC.
2-4.8.2.3.1        02      ELECTRICAL POWER SYSTEMS - 125 N/S                            NONE                            N VDC DISTRIBUTION 2-4.8.2.5.1        03      ELECTRICAL POWER SYSTEMS - 28 N/S                            NONE                            N VDC DISTRIBUTION
* 2-4. 9.12A          03      REFUELING OPERATIONS - FUEL N/S HANDLING BUILDING VENTILATION NONE                            N
 
                                                                                  -----          ------
Page No. 11 12/27 /89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-4.9.4            04 03 REFUELING OPERTAIONS -            N/S                          NONE                            N CONTAINMENT ISOLATION 2-AA ALM LST                AUXILIARY ANNUNCIATOR SYS CONTROL ROOM AREA ALARM LIST 2-AATL              00      AUXILIARY ALARM TYPEWRITER LIST 2-AOP-BLACKOUT-1    00 01 STATION BLACKOUT MODES 3          NONE                          NONE                SAT THROUGH 6 2-AOP-CA-l          00 01 COMPLETE LOSS OF CONTROL AIR      CAN PERFORM ALL CONTROL ROOM  NONE                SAT FUNCTIONS 2-AOP-CA-2          00 01 PARTIAL LOSS OF CONTROL AIR      NONE                          NONE                SAT
* 2-AOP-CC-1          00 01 LOSS OF COMPONENT COOLING        NO LEAK CAPABILITY            NONE                SAT        s 2-AOP-CC-2          00      COMPONENT COOLING SYSTEM        NONE                          NONE                SAT        s INLEAKAGE 2-AOP-CN-1          00      LOSS OF FEEDWATER PUMP          NONE                          NONE                SAT 2-AOP-CN-2          00      LOSS OF HEATER DRAIN PUMP      NONE                          NONE                SAT 2-AOP-CN-3          00      LOSS OF CONDENSATE PUMP        NONE                          NONE                SAT 2-AOP-COND-l        00      CONDENSER TUBE LEAK            CAN'T DRAIN WATER BOXES      NONE                SAT 2-AOP-COND-2        01 01 LOSS OF CIRCULATING WATER        CAN'T THROTTLE CV 74 &83      NONE                SAT        s AND/OR CONDENSER VACUUM                                                                                  I I
2-AOP-CONT-1        00      LOSS OF CONTAINMENT INTEGRITY NONE                            NONE                SAT                  I I
2-AOP-ELEC-125V-A  00      LOSS OF lA 125VDC BUS          NONE                          NONE                SAT I
2-AOP-ELEC-125V-B  00      LOSS OF lB 125VDC BUS          NONE                          NONE                SAT                  I I
2-AOP-ELEC-125VDC-C 00      LOSS OF lC 125VDC BUS          NONE                          NONE                SAT                  I
                                                                                                                                    *1 N/S
* 2-AOP-ELEC-21MAC    00      LOSS OF 21 MAC 115V                                          NONE DISTRIBUTION CABINET 2-AOP-ELEC-22MAC    00      LOSS OF 22 MAC 115V            N/S                          NONE
 
Page No. 12 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT UNIT 1 vs UNIT 2      VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
DISTRIBUTION CABINET 2-AOP-ELEC-250-DC  00      LOSS OF 250 VDC BATTERY BUS    N/S                          NONE 2-AOP-ELEC-28V-A    00      LOSS OF lA 28VDC BUS            N/S                          NONE                            s 2-AOP-ELEC-28V-B    00      LOSS OF lB 28VDC BUS            N/S                          NONE                            s 2-AOP-ELEC-460/230V 00 02 LOSS OF lA 460/230V VITAL        CAN'T SWAP BATTERY CHANGES    NONE                SAT        s
  -A                          BUSES 2-AOP-ELEC-460/230V 00 01 LOSS OF lB 460/230V VITAL        SIMULATOR CAN'T SWAP BATTERY  UNIT 1 DIRECTS SPDS SAT        s
  -B                          BUSES                          CHARGERS                      TO BE MANUALLY SWAPPED TO ALTERNATE POWER SUPPLY 2-AOP-ELEC-460/230V 00 01 LOSS OF lC 460/230V VITAL BUS SIMULATOR CAN'T SWAP CHARGERS UNIT 1 PROCEDURE        SAT        s
*
  -c                                                                                        DIRECTS SPDS TO BE SWAPPED TO IT'S BACKUP POWER WITHIN 30 MINUTES SINCE IT WON'T DO IT AUTOMATICALLY.
2-AOP-ELEC-4KV-A    01 01 LOSS OF lA 4KV VITAL BUS          NONE                          NONE                SAT 2-AOP-ELEC-4KV-B    01 01 LOSS OF lB 4KV VITAL BUS          NONE                          UNIT 2 HAS STEP TO  SAT VERIFY ST21 OPEN PRIOR TO OPENING SW26 2-AOP-ELEC-4KV-C    01 01 LOSS OF lC 4KV VITAL BUS          NONE                          NONE                SAT 2-AOP-ELEC-VIB-A    00      LOSS OF lA 115V VITAL          NONE                          NONE                SAT INSTRUMENT BUS 2-AOP-ELEC-VIB-B    00      LOSS OF lB 115V VITAL          NONE                          NONE                SAT INSTRUMENT BUS 2-AOP-ELEC-VIB-C    00      LOSS OF lC 115V VITAL          NONE                          NONE                SAT
* 2-AOP-ELEC-VIB-D    00 INSTRUMENT BUS LOSS OF lD 115V VITAL          NONE                          NONE                SAT
 
Page No. 13 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
INSTRUMENT BUS 2-AOP-EVAC-1        00 03 CONTROL ROOM EVACUATION          NONE                          NONE                SAT 2-AOP-EVAC-2        00 04 CNTL ROOM EVACUATION DUE TO FIRE IN THE CNTL ROOM/RELAY ROOM 2-AOP-FIRE-l        01      CONTROL ROOM FIRE RESPONSE    NONE                          NONE                SAT 2-AOP-MED-1        01 01 EMERGENCY MEDICAL RESPONSE      NONE                          NONE                SAT 2-AOP-NIS-l        00      MALFUNCTION OF APOWER RANGE    NO RACK 26                    NONE                SAT        s 2-AOP-NIS-2        00      MALFUNCTION OF AN INTERMEDIATE NONE                          NONE                SAT RANGE 2-AOP-NIS-3        00      MALFUNCTION OF ASOURCE RANGE NONE                            NONE                SAT
* 2-AOP-NIS-4        00      MALFUNCTION OF THE CHANNEL    N/S                            NONE                            N
                              &/OR DETECTOR CURRENT COMPARATOR 2-AOP-PZR-1        00      PRESSURIZER PRESSURE CONTROL  NONE                          DEVIATION IN        SAT MALFUNCTION - LOW PRESSURE                                    APPENDIX 1 - STEP B 4.1.2 - CLOSE 1C9X 2-AOP-PZR-2        00      PRESSURIZER PRESSURE CONTROL  NONE                          NONE                SAT MALFUNCTION - HIGH PRESSURE 2-AOP-RAD-l        00      LOSS OF REFUELING CAVITY      N/S                            NONE                            s LEVELS 2-AOP-RAD-2        00      AREA RADIATION SYSTEM ALARM    NONE                          DIFFERENCE IN        SAT PROCEDURE DUE TO MONITOR DIFFERENCE 2-AOP-RAD-3        00 01 PROCESS RADIATION SYSTEM ALARM NONE                            DIFFERENCE IN        SAT PROCEDURE DUE TO MONITOR DIFFERENCE BETWEEN UNITS.
* 2-AOP-RAD-4        00      PROCESS FILTER RADIATION      NONE                          NONE                SAT SYSTEM ALARM
 
                                            -----------~
Page No. 14 12/27/89 SALEM SIMULATOR
* PROCEDURE NUMBER              REV ACN DESCRIPTION PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-AOP-RAD-5        00      FUEL HANDLING INCIDENT          N/S                          NONE                            N 2-AOP-RCP-1        00 01 LOSS OF REACTOR COOLANT PUMP      NONE                          NONE                SAT AND OR FLOW 2-AOP-RCP-2        00 02 #1 SEAL FAILURE                  NONE                          CV107 NOT MENTIONED SAT IN UNIT 1 PROCEDURE.
STEP 3.15 DIFFERENT 2-AOP-RCP-3        00 01 LOSS OF SEAL INJECTION FLOW      NONE                          NONE                SAT 2-AOP-RCP-4        00 01 LOSS OF COMPONENT COOLING        NONE                          NONE                SAT WATER TO RCP 2-AOP-RCP-5        00 01 RCP HI VIBRATION                  NONE                          NONE                SAT
* 2-AOP-RCP-6        00 01 RCP MOTOR RADIAL BEARING OIL      N/S                          NONE                            s HI/LO LEVEL 2-AOP-RCP-7        00 01 RCP MOTOR BEARING HIGH            N/S                          NONE                            N TEMPERATURE 2-AOP-RCS-l        00 01 PARTIAL LOSS OF REACTOR          NONE                          NONE                SAT COOLANT 2-AOP-RCS-2        00      REACTOR COOLANT HIGH ACTIVITY NONE                            NONE                SAT 2-AOP-RHR-1        00      LOSS OF RHR COOLING            NONE                          NONE                SAT 2-AOP-RHR-2        00 01 LOSS OF RHR COOLING - LEVEL N/S                                NONE                            H BELOW THE PRESSURIZER EL. 104 2-AOP-ROD-l        00      FAILURE OF AROD CONTROL BANK tlONE                            NONE                SAT TO MOVE 2-AOP-ROD-2        00      CONTINUOUS ROD INSERTION OR    NONE                          NONE                SAT WITHDRAWAL 2-AOP-ROD-3        00      DROPPED ROD                    CANNOT PERFORM STEPS          NONE                SAT        s ASSOCIATED WITH P/A CONVERTER
* 2-AOP-ROD-4 2-AOP-ROD-5 00 00 MISALIGNED ROD MALFUNCTION OF INDIVIDUAL ROD NONE                            NONE                SAT
 
Page No. 15 12/27 /89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT UNIT 1 vs UNIT 2      VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
POSITION INDICATORS 2-AOP-SG-l          00 01 STEAM GENERATOR TUBE LEAK        NONE                          DIFFERENCE BETWEEN SAT PROCEDURES DUE R19 INTERLOCKS DIFFERENT BETWEEN UNITS 2-AOP-STM-1        00 01 SECONDARY PLANT LEAKS            N/S                            NONE                          s 2-AOP-SW-1          00      SERVICE WATER NUCLEAR HEADER    NOT ALL MANUAL OPERATIONS ARE NONE                  SAT      s LEAK                            CAPABLE OF BEING PERFORMED FROM CONTROL ROOM, BUT ARE TRANSPARTENT NOT NECESSARY FOR TRAINING 2-AOP-SW-2          00 01 SERVICE WATER TURBINE HEADER      N/S                            NONE LEAK
* 2-AOP-SW-3          00      SERVICE WATER BAY LEAK          NONE                          NONE 2-AOP-SW-4          00      SW LEAK MODE 5 OR 6 WITH        N/S                            NONE                          s REDUNDANT SW HEADER OUT FOR MA INT 2-AOP-TURB-1        00 01 TURBINE TRIP BELOW P-9            NONE                          NONE                SAT 2-AOP-TURB-3        00 01 LOSS OF MAIN TURBINE LUBE OIL NONE                              NONE                SAT 2-AOP-VENT-1        01      VITAL VENTIALTION MALFUNCTIONS N/S                            NONE                          s 2-AOP-VENT-2        01      LOW AUXILIARY BLDG &FUEL        N/S                            NONE                          s HANDLING BLDG AMBIENT TEMPERATURE 2-AOP-\HND-1        00 03 FLOODING AND/OR HIGH WIND        NONE                          NONE                SAT CONDITION 2-ARP-104          02      ALARM RESPONSE PROCEDURE PANEL N/S                            NONE                          N 104 2-ARP-2CC1          00      ALARM RESPONSE PROCEDURE -      CAN'T PERFORM - BEZEL 2-5,    EI-420 NO LONGER    SAT      s CONTROL CONSOLE lCCl            2-6, 2-7                      EXISTS
* BEZEL 1-2 OUT WTR RAD HI ONLY ON UNIT 1
 
Page No. 16 12/27/89 SALEM SIMULATOR
* PROCEDURE NUMBER              REV ACN DESCRIPTION PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
BEZEL 1-5 11 vs 21 HEPA D/P HI 3" vs 2" BEZEL 1-9, 1-10, 1-11, 1-12 ACCUM LEVEL ALARMS DIFFERENT UNIT 1 TO UNIT 2 2-ARP-2CC2          00      ALARM RESPONSE PROCEDURE -      NONE                          BEZEL 4-16, 12 vs 22 SAT CONTROL CONSOLE 2CC2                                          THRUSTHIG OIL PUMP HI 13 vs 8 PSIG 2-ARP-2CC3          00      ALARM RESPONSE PROCEDURE -      NONE                          8/3/89 -            SAT CONTROL CONSOLE 2CC3                                          BZ 5 HAS WRONG STPT
* BZ 5 EHC HI/LO LEVEL DIFFERENT BZ 6 U2 EXCITER FLD BRKR REFERS TO RX TRIP > 10%
BZ 6 Ul DOESN'T HAVE VOLT LEG OFF &
PWR SP STAB OFF BZ 6 Ul DOESN'T HAVE LOW VAC. ALARM 2-ARP-2RP1          03      ALARM RESPONSE PROCEDURE -      NONE                          NONE                SAT 2RP1 2-ARP-968                  STATOR COOLING PANEL ALARM      N/S                          NONE                            s RESPONSE PROCEDURE 2-ARP-CC-BZL        01      VOID 2-ARP-CC-OHA        01      VOID 2-ARP-DG            02 02 ALARM RESPONSE PROCEDURE -        N/S                          NONE                            s DIESEL GENERATORS 2-ARP-GT            02      ALARM RESPONSE PROCEDURE - GAS N/S                            UNIT 1 ONLY                    N
* 2-ARP-OHA-A TURBINE 03 01 OVERHEAD ANNUNCIATOR ALARM        NONE                          A4 - SLIGHT          SAT
 
Page No. 17 12/27/89 SALEM SIMULATOR
* PROCEDURE NUMBER              REV ACN DESCRIPTION PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2      VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
RESPONSE - WINDOW A                                          DIFFERENCE DUE TO Ul's NEW INVERTERS Al2 - SLIGHT DIFFERENCE DUE TO Ul' s NEW INVERTERS A20 - SLIGHT DIFFERENCE DUE TO Ul's NEW INVERTERS A22 - ONLY ON Ul (FIRE PROT WTR PRESS LO)
A28 - SLIGHT DIFFERENCE DUE TO Ul's NEW INVERTERS A30 - FIRE PMP RUN ONLY ON Ul A36 - SLIGHT
* DIFFERENCE DUE TO Ul's INVERTERS A37 - FIRE PMP TRBL ONLY ON Ul A44 - FIRE PROT WTR FLOW IN AUX BLDG ONLY ON Ul 2-ARP-OHA-B        02 06 OVERHEAD ANNUNCIATOR ALARM      NONE                          B4 - RMS AREA RAD HI SAT RESPONSE - WINDOW B                                          ONLY ON Ul 85 - FRESH WATER SP TRBL ONLY ON Ul B12 - RMS PROCESS RAD HI Ul ONLY B13 - RMS TROUBLE ONLY ON U2 B13 - FW LOS PRESS Ul ONLY B14 - RMS CH TEST ONLY 011 Ul B20 - RMS PROCESS FILTER RAD HI Ul ONLY B29 - FW PRE TREAT TRBL Ul ONLY
* B30 - SW PMP SMP AREA LVL STPTS DIFFERENT Ul VS U2
 
Page No. 18 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
B31 - SW SMP AREA LVL STPTS DIFFERENT B36 - HTG WTR STM SP TROUBLE Ul ONLY B43 - SEISMIC RCDR SP ACT Ul ONLY B44 - AUX BOILER TRBLE Ul ONLY B48 - 12CC ZX SW FLOW HI - Ul RESPONSE SLIGHTLY DIFFERENT DUE TO PLATE HX 2-ARP-OHA-C        04 01 OVERHEAD ANNUNCIATOR ALARM      NONE                          NONE                SAT RESPONSE - WINDOW C
* 2-ARP-OHA-D        04 04 OVERHEAD ANNUNCIATOR ALARM      NONE                          Dl - Ul DIRECTS I&C SAT RESPONSE - WINDOW D                                                U2 DIRECTS CHEMSITRY RESPONSE D3 - U2 REFERS TO El's D4 - U2 BLANK U2 BIT DISCH PRESS HI Dll - STILL REFERS TO EI Is D12 - U2 BIT DISCH PRESS HI - Ul RHl OPE}! ALARM D13 - U2 DOESN'T MENTION MANUALLY INITIALLY CONTAINMENT EVAC HORM        IF BLOCKED D17 - NON RAD LIQ WSTE TRBL ONLY Ul D20 - 1R112 NOT FULL CLOSED ONLY ON Ul D24 - Ul CRDM VIB ALARM
* D26 - VTL HI TRACE TRBL Ul ONLY D34 - U2 BLANK Ul CH. CDEC SDM
 
Page No. 19 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
D35 - RWST HI LO LVL Ul ONLY CONSOLE ALARM ON U2 D36 - RWST LVL LO B/U Ul ONLY D36 - U2 CH. CDEC SDM D40 - U2 STILL REFERS TO El's D43 - LABEL DIFFERENT Ul - U2 BUT RESPONSE EXACTLY THE SAME D44 - U2 CH. DDEC SDM Ul RWST LO LO D46 - U2 BLANK Ul CH. DDEC SDM
* 2-ARP-OHA-E            06 OVERHEAD ANNUNCIATOR ALARM RESPONSE - WINDOW E NONE D47 - U2 STILL REFERS TO El's E5 - U2 STILL REFERS SAT TO El's E13 - U2 STILL REFERS TO El's E21 - U2 STILL REFERS TO El's E24 - U2 STILL REFERS TO EI's E32 - U2 ENTRY CONDTIONS DIFFERENT (SCREEN WAS DIFFERENT?)
E35 - Ul &U2 BOTH REFER TO El's AND CONFLICTS WITH CURRENT AOP E36 - MAN ACTIONS NOT CONSISTENT WITH EOP E37 - MAN ACTIONS NOT CONSISTENT WITH
* EOP's E44 - AUX FW ISOL INLK - U2 ONLY
 
Page No. 20 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-ARP-OHA-F        04 02 ALARM RESPONSE PROCEDURE -      NONE                          F20 - UNIT 1 UNIT 2 SAT WINDOW F                                                      STPTS DIFFERENT 75 vs 70 2-ARP-OHA-G        02 05 OVERHEAD ANNUNCIATOR ALARM      NONE                          G4 - DIFF DUE TO    SAT RESPONSE - WINDOW G                                          SEAL OIL DIFFERENCES G6 - Ul-2 DIFF.
GENERATOR DIFFERENCES Gll - Ul-U2 DIFFERENT GENERATOR DIFFERENCES Gl2 - Ul-U2 DIFFERENT NAME ONLY Gl4 - Ul-U2 NAMES DIFFERENT WITH
* SIMILIAR RESPONSE G20 - DIFFERENT Ul-U2 G22 - DIFFERENT Ul-U2 G27 - DIFFERENT G28 - DIFFERENT G29 - Ul-U2 RESPONSE SLIGHTLY DIFFERENT G30 - DIFFERENT G35 - STPTS AND ACTIONS SLIGHTLY DIFFERENT G37 - ENTRY CONDITIOS DIFFERENT G38 - STPTS DIFFERENT G39 - DIFFERENT G40 - DIFFERENT G43 - DIFFERENT G44 - DIFFERENT G45 - STPTS DIFFERENT
* 2-ARP-OHA-H        02 05 OVERHEAD ANNUNCIATOR ALARM      NONE                          Al - ENTRY          SAT RESPONSE - WINDOW H                                          CONDITIONS DIFFERENT ACTIONS THE SAME H2 - ENTRY
 
Page No. 21 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
CONDITIONS DIFFERENT H9 - ENTRY CONDITIONS DIFFERENT HlO - ENTRY CONDITIONS DIFFERENT H22 - U2 ONLY "BLWDN SMPL FLO LO" H25 - ENTRY CONDITIONS DIFFERENT H27 - ENTRY CONDITIONS DIFFERENT H29 - ENTRY CONDITIONS DIFFERENT H31 & 32 - ARE REVERSED BETWEEN Ul
                                                                                            &U2 H33 - ENTRY
* CONDITIONS ARE DIFFERENT H39 &H40 - ARE REVERSED BETWEEN Ul
                                                                                            &U2 H42 - Ul ONLY 2-ARP-OHA-J        02 01 OVERHEAD ANNUNCIATOR ALARM      NONE                          J14 - Ul ONLY        SAT RESPONSE - WINDOW J                                          J20 - DIFFERENT STPTS FOR BUS UNDERVOLTAGE J22 - Ul ONLY J23 - U2 ONLY 2-ARP-OHA-K        02 02 OVERHEAD ANNUNCIATOR ALARM      NONE                          8/7/89              SAT RESPONSE - WINDOW K                                          K4 - ALARMS DIFFERENT Kll - ALARMS DIFF.
K12 - ALARMS DIFF.
Kl3 - ALARMS DIFF.
K14 - ALARMS DIFF.
K20 - ALARMS DIFF.
K21 - Ul ONLY
* K28 - Ul SAME AS K37 U2 K29 - Ul ONLY
 
Page No. 22 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
K35 - Ul ONLY K36 - Ul ONLY 2-ARP-PZR-BZL      01      VOID 2-ARP-PZR-OHA      01      VOID 2-ARP-RCS-BZL      01      VOID 2-ARP-SF-OHA        01      VOID 2-CC ALM LIST      04      VOID 2-EI-4.1            08      VOID 2-EI-4 .11          06      VOID
* 2-EI-4.12          06      VOID 2-EI -4 .13        05      VOID 2-EI -4.14          07      VOID 2-EI-4.15          07      VOID 2-EI-4.16          01      VOID 2-EI-4.18          06      VOID 2-EI-4.19          06      VOID 2-EI-4.20          08      VOID 2-EI-4.21          04      VOID 2-EI-4.22          04      VOID 2-EI-4.25          02      VOID 2-EI-4.26          02      VOID 2-EI-4.6            06      VOID
* 2-EI-4.7            09      VOID
 
-------~--------------------------------                                                ---    -
Page No. 23 12/27/89 SALEM SIMULATOR
  **    PROCEDURE PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
        =================== === === ============================== ============================== ==================== ========== ========
2-EI-4.9            12      VOID 2-EOP-APPX-1        01      COMPONENT COOLING WATER        NONE                          NONE                SAT RESTORATION 2-EOP-APPX-2        01      PRESSURIZER HEATER EMERGENCY    NONE                          NONE                SAT FEED
      . f-'EOP-APPX-2 F    01      PRESSURIZER HEATER EMERGENCY FEED APERTURE CARD FLOW CHART
* 2-=EOP-APPX-3        01      SI VERIFICATION                NONE                          UNIT 1 vs UNIT 2    SAT TABLE ASLIGHTLY DIFFERENT DUE TO SJ44 &CCW HX DIFFERENCES
"'
* 2-EOP-APPX-4        01      POST SI SYSTEM RESTORATION      STEP 1 CANNOT BE PERFORMED    NONE                            N BECAUSE COS-1 DOES NOT EXIST.
2-EOP-APPX-6        01      RCP SEAL COOLING RESTORATION    NONE                          NONE                SAT 2-EOP-CFST-1        01 01 CRITICAL SAFETY FUNCTION          NONE                          NONE                SAT STATUS TREES 2-EOP-FRCC-l        01      RESPONSE TO INADEQUATE CORE    MSlO'S CAN NOT BE OPERATED    NONE                SAT        s COOLING                        LOCALLY 2-EOP-FRCC-2        01      RESPONSE TO DEGRADED CORE      NONE                          NONE                SAT COOLING 2-EOP-FRCC-3        01      RESPONSE TO SATURATED CORE      NONE                          NONE                SAT COOLING INSTRUCTIONS 2-EOP-FRCE-1        01      RESPONSE TO EXCESSIVE          NONE                          NONE                SAT CONTAINMENT PRESSURE 2-EOP-FRCE-2        01      RESPONSE TO HIGH CONTAINMENT    NONE                          NONE                SAT SUMP LEVEL 2-EOP-FRCE-3        01      RESPONSE TO HIGH CONTAINMENT    NONE                          NONE                SAT RADIATION
* 2-EOP-FRCI-1        01      RESPONSE TO HIGH PRESSURIZER    NONE                          NONE                SAT LEVEL
 
Page No. 24 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-EOP-FRCI-2        01      RESPONSE TO LOW RCS INVENTORY NONE                            NONE                SAT 2-EOP-FRCI-3        01      RESPONSE TO VOID IN REACTOR    NONE                          NONE                SAT VESSEL 2-EOP-FRHS-1        01      RESPONSE TO LOSS OF SECONDARY NONE                            NONE                SAT HEAT SINK 2-EOP-FRHS-2        01      RESPONSE TO STEAM GENERATOR    SIMULATOR CAN'T PAIL ALL S/G  NONE                SAT        N OVERPRESSURE                    SAFETIES 2-EOP-FRHS-3        01      RESPONSE TO STEAM GENERATOR    NONE                          NONE                SAT HIGH LEVEL 2-EOP-FRHS-4        01      RSVP TO LOSS OF SG ATMOSPHERIC NONE                          NONE                SAT RELIEFS &CONDENSER DUMP VLV
* 2-EOP-PRHS-5        01      RESPONSE TO SG LOW LEVEL        NONE                          NONE                SAT 2-EOP-FRSM-1        01      RESPONSE TO NUCLEAR POWER      SEVERAL STEPS IN STEP 1 CAN'T NONE                SAT        N GENERATOR                      BE DONE BECAUSE THE VALVES NO LONGER EXIST.
2-EOP-FRSM-2        01      RESPONSE TO LOSS OP CORE        NONE                          NONE                SAT SHUTDOWN 2-EOP-FRTS-l        01      RESPONSE TO IMMINENT            NONE                          NONE                SAT PRESSURIZED THERMAL SHOCK CONDITIONS 2-EOP-FRTS-2        01      RESPONSE TO ANTICIPATED        NONE                          NONE                SAT PRESSURIZED THERMAL SHOCK CONDITIONS 2-EOP-LOCA-1        01 01 LOSS OF REACTOR COOLANT          NONE                          STEP 6.3 DEMIN      SAT CONTROLLED FROM UNIT 1
2-EOP-LOCA-2        01 01 POST-LOCA COOLDOWN &              NONE                          NONE                SAT DEPRESSURIZATION
* 2-EOP-LOCA-3        01 01 TRANSFER TO COLD LEG              NONE                          NOTED UNIT 1, UNIT 2 SAT RECIRCULATION                                                IN "SEMI AUTO SWAPOVER"
 
Page No. 25 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-EOP-LOCA-4        01      TRANSFER TO HOT LEG            STEP 3 5 6 CAN'T PERFORM NONE I I RECIRCULATION                  EPI-13 PROCEDURE DOESN'T EXIST 2-EOP-LOCA-5        01      LOSS OF EMREGENCY              NONE                          STEP 29 HAS          SAT RECIRCULATION                                                  DIFFERENT S/G PRESSURE STPT 2-EOP-LOCA-6        01      LOCA OUTSIDE OF CONTAINMENT    N/S                            NONE                          s 2-EOP-LOPA-l        01      LOSS OF ALL AC POWER            NONE                          STEP 62. 2 DEMIN    SAT WATER PUMP CONTROLLED FROM UNIT 1
2-EOP-LOPA-2        01      LOSS OF ALL AC POWER            NONE                          NONE                SAT RECOVERY/SI NOT REQUIRED
~ 2-EOP-LOPA-3        01      LOSS OF ALL AC POWER            NONE                          NONE                SAT RECOVERY/SI REQUIRED 2-EOP-LOSC-l        01      LOSS OF SECONDARY COOLANT      NONE                          STEP 10.2 DIFFERENT SAT DUE TO UNIT 1 HAVING DEMIN. WATER CONTROLS.
TABLE A- UNIT 2 DOESN'T HAVE RMS R-21 TABLE D- IS DIFFERENT BETWEEN UNIT 1 &UNIT 2 2-EOP-LOSC-2        01      MULTIPLE SG DEPRESSURIZATION    NONE                          STEP 10 ONLY UNIT 1 SAT CAN START DEMIN WATER PUMPS 2-EOP-SGTR-1        01 01 STEAM GENERATOR TUBE RUPTURE      NONE                          STEP 12 ONLY UNIT 1 SAT CAN START DEMIN WATER PUMPS
* STEP 40.l UNIT 2 HAS STEP TO SWAP WD900 &
901 UNIT 1 DOESN'T, BUT SHOULD
 
Page No. 26 12/27/89
* SALEH SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-EOP-SGTR-2        01      POST SGTR COOLDOWN              NONE                          STEP 40 UNIT 1      SAT STARTS THE DEMIN WATER PUMPS 2-EOP-SGTR-3        01 01 SGTR WITH LOCA-SUBCOOLED          NONE                          TABLE BDIFFERENT SAT RECOVERY                                                      BETWEEN UNITS STEP 12 ONLY UNIT 1 CAN START DEMIN TRANSFER PUMP.
2-EOP-SGTR-4        01 02 SGTR WITH LOCA-SATURATED          NONE                          VAL DATE - 7/27/89  SAT RECOVERY                                                      SAT. STEP 10.2 ONLY UNIT 1 CAN
* 2-EOP-SGTR-5        01      SGTR WITHOUT PZR PRESS CONTROL NONE START DEMIN WATER PUMP STEP 4.2 DEMIN WATER SAT PUMP CAN ONLY BE STARTED FROM UNIT 1 2-EOP-TRIP-1        01 04 REACTOR TRIP OR SAFETY            NONE                          DIFFERENCES STEP 20 SAT INJECTION                                                    APD LOCATIONS DIFFERENT 22.1 SJ44 POWER LOCK - US -
C/T TABLE F UNIT 2 DOESN'T HAVE R-21 MONITOR 2-EOP-TRIP-2        01      REACTOR TRIP RESPONSE          NONE                          NONE                SAT 2-EOP-TRIP-3        01      SI TERMINATION                  NONE                          TABLE B - UNIT 2    SAT DOESN'T HAVE R-21 STEP 24.2 DE~IIN WATER IN UNIT 1 ONLY .
* 2-EOP-TRIP-4        01      NATURAL CIRCULATION COOLDOWN    NONE                          STEP 11.1 DEMIN      SAT
 
Page No. 27 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT UNIT 1 vs UNIT 2      VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
WATER PUMPS CONTROL UNIT 1.
2-EOP-TRIP-5        01      NATURAL CIRCULATION RAPID      STEPS CAN BE PHYSCIALLY        ALL EXCEPT 38 (VARY UN SAT    H COOLDOWN WITHOUT RVLIS          PERFORMED BUT YOU CANNOT GET ACHANGING MIN STOP)
BUBBLE IN THE HEAD WHICH MAY HAPPEN AFTER STEP 11 2-EOP-TRIP-6        01      NATURAL CIRCULATION RAPID      ALL STEPS CAN BE PERFORMED BUT NONE                UN SAT    H COOLDOWN WITH RVLIS            YOU WON'T GET ABUBBLE IN THE HEAD 2-II-1.3.1          05 03 REACTOR COOLANT PUMP OPERATION SIMULATOR CANNOT MONITOR TEMP NONE                    SAT      s VIA DORIC 2-II-1.3.2          03      OPERATION OF METAL IMPACT      N/S                            NONE                          s MONITORING SYSTEM
* 2-II-1.3.3          04 01 RELEASE RADIOACTIVE LIQUID WST N/S                              NONE                          s FROM i2 WST MONITOR HUT 2-II-1. 3. 4        07 04 FILLING AND VENTING THE RCS      N/S                            NONE                          L 2-II-1.3.5                  REACTOR COOLANT SYSTEM - LEAK REACTOR VESSEL SUMP PUMP N/S    NONE                SAT      M RATE DETECTION 2-II-1.3.6          05 03 DRAINING THE REACTOR COOLANT      N/S                            UNIT 1 REQUIRES EACH          L SYSTEM                                                        STEP IN THE PROCEDURE BE INITIALED UNIT 2 DOES NOT.
UNIT 1 REQUIRES WASTE GAS SYSTEM BE IN SERVICE. UNIT 2 DOES NOT UNIT 1 REMOVES APRT RUPTURE DISC TO PROVIDE AVENT PATH.
* UNIT 2 VENTS THE PRT TO THE IODINE REMOVAL UNITS VIA TYGON TUBING
 
Page No. 28 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
ATTACHED TO VENT VALVES OR TUBINE ATTACHED TO POLY BOTTLE.
UNTI 1 REQURES RCDT TO BE ISOLATED AND RCDT PUMPS LOCKED-OUT AND CAUTIONED TAGGED.
UNIT 2 DOES NOT.
UNIT 1 REQUIRES RCS HIGH TEMPERARTURE ALARM BE OPERATIONAL. UNIT 2 DOES NOT .
* UNIT 1 ALIGNS LETDOWN TO eves HOLP-UP TANKS. UNIT 2 ALIGNS LETDOWN TO RWST.
UNIT 1 DURING HEAD VENTING DIRECTS THAT IODINE REMOVAL UNITS NOT BE IN SERVICE UNLESS RADIATION PROTECTION PERSONNEL REQUEST THEY BE STARTED. UNIT 2 REQUIRES IODINE REMOVAL UNITS BE IN SERVICE UNLESS RADIATION PROTECTION PERSONNEL REQUEST THEY BE STOPPED.
UNIT 1 PROVIDES TABLE 3, MID-LOOP OPERATION PRIMARY
* SYSTEM JOBS CHECK-LIST. UNIT 2 DOES NOT.
 
Page No. 29 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
UNIT 1 REQUIRES OPERATORS TO SIGN-OFF ACCEPTANCE OF FIELD LOCATION OF TYGON TUBINE AND SCALE. UNIT 2 DOES NOT.
UNIT 1 REQUIRES HERCULITE AND FOREIGN PARTS SCREENS BE INSTALLED WHEN PRESSURIZER SAFETIES ARE REMOVED. UNIT 2 DOES NOT.
UNIT 1 REQUIRES
* SYSTEM ENGINEERING AND I&C BE NOTIFIED IF AT 104 FEET CONSOLE LEVEL INDICATION AND TYGON TUBE LEVEL INDICATION DIFFER BY MORE THAN 3 INCHES.
UNIT 2 DOES NOT.
UNIT 1 REQUIRES PERSONNEL BE TRAINED ON THE PROCEDURE PRIOR TO IMPLEMENTATION.
UNIT 2 DOES NOT.
UNIT 2 REQUIRES AT LEAST TWO STEAM GENERATOR WIDE RANGE LEVEL CHANNELS INDICATE GREATER THAN 70% OR TWO PRIMARY SIDE MANWAYS ARE REMOVED. UNIT 1
* DOES NOT .
UNIT 2 ALLOWS A MAXIMUM OF TWO STEAM
 
i----------
1 I
Page No.      30 I
12/27/89
* I SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                      SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
    =================== === === ============================== ============================== ==================== ========== ========
GENERATOR NOZZLE DAMS IN PLACE. UNIT 1 HAS NO LIMIT BUT REQUIRES OPERATIONAL OVERHEAD ALARMS.
UNIT 2 PROVIDES DIRECTION FOR REMOVAL OF PRIMARY SIDE MANWAYS. UNIT 1 DOES NOT 2-II-1.3.7          00      RX VESSEL LEVEL MONITORING      NONE                          NONE                SAT SYSTEM (RVLIS) NORMAL OPERATION
* 2-II-10.3.1        04      SAMPLING SYSTEM OPERATION        NONE                          NONE                SAT 2-II-10. 3. 2      03      GAS AllALYZER OPERATION          N/S                            NONE                          N 2-II-11. 3.1        03      WASTE HOLDUP TANK - NORMAL      SIMULATOR CAN'T TRANSFER WATER NONE                SAT      L OPERATION 2-II-11.3.2B        05 03 RLS RADIOACTIVE LQD WST TO        LOCAL PROCEDURE                UNIT 2 HAS STEPS TO SAT CIRC WTR SYS - 21 22 MONITOR                                    OPEN R18 MONITOR TNK                                                            RETURN VALVE WHEN LINING UP TO DISCHARGE IN EACH SECTION 2-II-11.3.2C        00      RELEASE OF RADIOACTIVE LIQUID N/S                              UNIT 2 HAS STEPS TO WASTE FROM #2 WASTE MONTOR                                      OPEN Rl8 MONITOR HOLDUP TANK                                                    RETURN VALVE WHEN LINING UP TO DISCHARGE IN EACH SECTION 2-II-11.3.3        01      WASTE EVAPORATOR - NORMAL        N/S                            UNIT 2 DOESN'T HAVE            s OPERATION                                                      AWASTE EVAP ONLY A VALVE LINEUP WHILE THEY WAIT FOR ANEW ONE
* 2-II-11.3.4        04      REACTOR COOLANT DRAIN TANK -    LOCAL PROCEDURE                NONE                SAT NORMAL OPERATION
 
    -----------                                    -----~--------------------
Page No.      31 12/27I89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-II-12.3.1        04 02 GASEOUS WASTE DISPOSAL SYSTEM LOCAL PROCEUDRE                  UNIT 2 HAS PROVISION SAT
                              - NORMAL OPERATION                                            FOR INITIALS FOR EACH STEP 2-II-12.3.2        02      REMOVAL OF MOISTURE FROM GAS    N/S                          NONE                            N DECAY TANKS 2-II-12.3.3        03 04 DISCHARGE OF GASEOUS WASTE TO LOCAL PROCEDURE                  NONE                SAT THE PLANT VENT 2-II-12.3.3A        00 02 CONTAINMENT PURGE TO THE PLANT NONE                            NONE                SAT VENT 2-II-12. 3. 4      03 01 TRANSFER OF WASTE GAS 2-II-14.3.1        02      CONTAMINATED DRAIN SYSTEM -    NONE                          NONE                SAT
* 2-II-15.3.l 2-II-15.3.2 NORMAL OPERATION 03 02 HYDROGEN RECOMBINERS - NORMAL NONE [SIMULATOR HAS ONLY 1 OPERATION 04 01 PERSONNEL AIR LOCKS AND RECOMBINER)
N/S NONE NONE SAT N
CONTAINMENT ENTRY 2-II-16.3.1        05 02 CONTAINMENT VENTILATION          NONE                          UNIT 1 REFERS TO    SAT OPERATION                                                    13A-E (AUTO SW ISOLATION) 2-II-16.3.2        03      SWITCHGEAR AND PENETRATION      NONE                          NONE                SAT AREAS VENTILATION OPERATION 2-II-17.3.1        04 01 AUXILIARY BUILDING VENTILATION NONE                            NONE                SAT OPERATION 2-II-17.3.2        05 01 CONTROL ROOM VENTILATION          llONE                        NONE                SAT OPERATION 2-II-17 .3.3        02 01 FUEL HANDLING BUILDING            NONE                          NONE                SAT VENTILATION OPERATION 2-II-17.3.4        03      DIESEL GENERATOR AREA          NONE                          NONE                SAT VENTILATION OPERATION
* 2-II-2.3.1          03      PURGING THE PRESSURIZER RELIEF 11/S                          NONE                            s TANK OF OXYGEN
 
Page No. 32 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
    =================== === === ============================== ============================== ==================== ========== ========
2-II-2. 3. 2        02      PURGING THE PRESSURIZER RELIEF NONE                          NONE                SAT TANK OF HYDROGEN 2-II-2.3.3          03      PRESSURIZER RELIEF TANK -      NONE                          NONE                SAT NORMAL OPERATION 2-II-2.3.4          05      PRESSURIZER OVERPRESS PROTCT - NONE                          NONE                SAT OPERABILITY CK OFF PRl &PR2 2-II-2.3.5          02      PRESSURIZER PRESSURE CONTROL    NONE                          NONE                SAT SYSTEM OPERATION 2-II-2.3.6          01      ESTABLISHING RCS VENT PATH TO NONE                            NONE                SAT PRESSURIZER RELIEF TANK 2-II-2.3.7          01      TERMINATING RCS VENT PATH TO    NONE                          NONE                SAT PRESSURIZER RELIEF TANK
* 2-II-2.3.8          02      SETTING PRESSURIZER SPRAY      NONE                          NONE                SAT BYPASS FLOW 2-II-3.3.1          04 02 ESTABLISHING CHARGING, LETDOWN NONE                            UNIT 1 HAS SECTION  SAT
                                &SEAL INJECTION FLOW                                          OF PROCEDURE FOR PLACING LETDOWN IN AT NOP 2-II-3.3.10          04 01 ESTABLISHING AHYDROGEN            NONE                          UNIT 1 DIRECTS 120 SAT ATMOSPHERE IN THE VOLUME                                      GPM FLOW DURING CONTROL TNK                                                  EVALUATION. UNIT 2 DOES NOT 2-II-3.3.11          03      VOLUME CONTROL TANK            NONE                          NONE                SAT DEGASIFICATION 2-II-3.3.12          04      eves DEMINERALIZER - NORMAL    NONE                          NONE                SAT OPERATION 2-II-3.3.15          00      SPENT RESIN STORAGE TANK        N/S                          NONE                            N OPERATIONS 2-II-3.3.17          08 01 BORIC ACID EVAPORATOR - NORMAL N/S                              NONE                            N OPERATION
* 2-II-3.3.18          00 01 21 BORIC ACID EVAPORATOR FEED N/S                              NONE                            N ION EXCHANGER - RESIN REMOVAL I
L ___ _
 
                                                                                                                          - -
I    Page No.
12/27/89 33
* I                                                              SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 I
SORTED BY PROCEDURE NUMBER I
PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
    =================== === === ============================== ============================== ==================== ========== ========
2-II-3.3.19        00 01 23 BORIC ACID EVAPORATOR FEED N/S                              NONE                            N ION EXCHANGER - RESIN REMOVAL 2-II-3.3.2          03      OPERATING THE CHARGING PUMPS    NONE                          NONE                SAT 2-II-3.3.20        00 01 21 MIXED BED ION EXCHANGER -      N/S                          NONE                            N RESIN REMOVAL 2-II-3.3.21        00 01 2 CATION BED ION EXCHANGER -      N/S                          NONE                            N RESIN REMOVAL 2-II-3.3.22        00 01 2 SPENT FUEL PIT DEMINERALIZER N/S                              NONE                            N
                                - RESIN REMOVAL 2-II-3.3.23        00 01 22 MIXED BED ION EXCHANGER -      N/S                          NONE                            N RESIN REMOVAL
* 2-II-3.3.24        00 01 22 BORIC ACID EVAPORATOR FEED N/S                              NONE                            N ION EXCHANGER - RESIN REMOVAL 2-II-3.3.25        00 01 24 BORIC ACID EVAPORATOR FEED N/S                              NONE                            N ION EXCHANGER - RESIN REMOVAL 2-II-3.3.26        00 01 21 EVAPORATOR DISTILLATE ION      N/S                          NONE                            N EXCHANGER - RESIN REMOVAL 2-II-3.3.27        00 01 22 EVAPROATOR DISTILLATE ION      N'n I~                          NONE                            N EXCHANGER - RESIN REMOVAL 2-II-3.3.28        00 01 21 DEBORATING ION EXCHANGER - N/S                              NONE                            N RESIN REMOVAL 2-II-3.3.29        00 01 22 DEBORATING ION EXCHANGER - N/S                              NONE                            N RESIN REMOVAL 2-II-3.3.3          01      EXCESS LETDOWN FLOW            NONE                          NONE                SAT 2-II-3.3.4          03 01 PLACING eves HOLDUP TANKS IN      NONE                          #12 eves HUT C/T    SAT SERVICE 2-II-3.3.5          09      BORIC ACID SOLUTION            LOCAL PROCEDURE              NONE                SAT PREPARATION AND TRANSFER
* 2-II-3.3.6          02      BORON CONCENTRATION CONTROL    NONE                          NONE                SAT
 
l Page No. 34 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-II-3.3.7          02 01 BORIC ACID SYSTEM - NORMAL        NONE                          NONE                SAT OPERATION 2-II-3.3.8          02 01 RAPID BORATION                    NONE                          NONE                SAT 2-II-3.3.9          03      PRIMARY WATER SYSTEM - NORMAL N/S                            NONE                            N OPERATION 2-II-4. 3.1        03      SAFETY INJECTION SYSTEM -      N/S                          NONE                            N NORMAL OPEARATION 2-II-4.3.2          04      FILLING AND VENTING THE SAFETY LOCAL PROCEDURE                NONE                SAT INJECTION SYSTEM 2-II-4.3.4          03 01 FILLING AND CHARGING              SIMULATOR CAN'T PERFORM SEC  UNIT 1 HAS ANOTE SAT            s ACCUMULATORS                    5.6                          AFTER STEP 5.1.4 AND
* 2-II-4.3.5 2-II-5.3.1 VOID 03 02 FILLING AND VENTING THE CONTAINMENT SPRAY SYSTEM LOCAL PROCEDURE UNIT 2 IS BEFORE NONE                SAT 2-II-6.3.2          05 01 INITIATING RESIDUAL HEAT          NONE                          ON UNIT 2 PRECAUTION SAT REMOVAL                                                      3.14 HAS SPECIFIC RECIRC FLOW LIMITS.
ALSO COS-1 RECIRC FLOW DATA SHEET EVERY STEP IN THE PROCEDURE THAT CALLS FOR STARTING THE RHR PUMP REQUIRES A ENTRY IN COS-1 2-II-6.3.3          04      TERMINATING RESIDUAL HEAT      NONE                          NONE                SAT REMOVAL 2-II-6. 3. 4        04 01 FILLING AND VENTING THE RHR      LOCAL                        NONE                SAT        N SYSTEM 2-II-7.3.2          05      COMPONENT COOLING SYSTEM -      NONE                          UNIT 1 CONTAINS AN SAT
* NORMAL OPERATION                                              EXTRA PRECAUTION AND AN EXTRA STEP FOR BACKFLUSH OF 12 (PLATE TYPE ICC HX
 
Page No. 35 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-II-7.3.3          00      UNIT 2 - 22CC HEAT EXCHANGER    LOCAL PROCEDURE              PROCEDURE ENTIRELY SAT NORMAL OPERATION                                              DIFFERENT DUE TO HX TYPES DIFFERENT 2-II-8.3.1          06 01 FILLING THE SPENT FUEL PIT        N/S                          NONE                            N 2-II-8. 3.10        00 01 TRANSFER POOL BORATED WATER      N/S                          UNIT 2 ONLY                    N TRANSFER 2-II-8.3.2          05      SPENT FUEL COOLING SYSTEM      N/S                          NONE                            N OPERATION 2-II-8.3.3          04 01 FILLING THE REACTOR REFUELING N/S                              STEP 2.3.3 HAS                  N CAVITY                                                        DIFFERENT BORON SPECS FOR RWST UNIT 1 2300 - 2500 UNIT 2
* 2-II-8.3.4          03 02 DRAINING THE REACTOR REFUELING N/S CAVITY
                                                                                            ) 2000 INITIAL COND DIFFERENT UNIT 1 DIRECTS MONITORING OF VESSEL LEVEL WITH N
SPECIFIC POINTS UNIT 2 DOESN'T. STEP 3.3 ABOUT RHR MINIMUM FLOW REQUIRES NEO MONITOR CAVITY LEVEL IN CONTAINMENT UNIT 2 DOESN'T. UNIT 1 MONITORS/CONTROLS FLOW &RHR PUMPS APMS DURING DRAIN DOWN UNIT 2 DOESN'T 2-II-8. 3. 5        03      REFUELING WATER PURIFICATION    N/S                          NONE                SAT        N SYSTEM OPERATION 2-IH.3.9            00      EMERGENCY FILLING OF THE SPENT N/S                            NONE                SAT        N FUEL POOL FROM THE PWST 2-III-1. 3.1        04 14 TURBINE-GENERATOR OPERATION      SIMULATOR USES UNIT 1        PURPOSE INITIAL      SAT        s
* PROCEDURE                    COND. SAME PRECAUTIONS ABOUT STATOR COOLING WATER DIFFERENT UNIT 1 HAS
 
Page No.      36 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2      VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
ADDITION PRECAUTIONS IN THE CASE 12 GEAR VALVE GOING SHUT.
SECT. 1.5 (TURBINE ROLL UP) SECT. 5.2 DIFFERENT (EXCITATION). APP.
ARE SIMILAR (ALL CURVES ARE DIFFERENT) NO SI.MULATOR DIFFERENCE 2-III-1.3.2        02      TURBINE OVERSPEED TEST          NONE                          NONE                  SAT 2-III-1.3.3        03      TURBINE VALVE TESTS            NONE                          INITIAL POWER LEVEL SAT DIFFERENT
* 2-III-1.3.4        02      TURBINE TURNING GEAR OPERATION LOCAL PROCEDURE                NONE                  SAT 2-III-1.3.5        04 03 TURBINE SHUTDOWN                  NONE                          NONE                  SAT 2-III-1.3.6        02      E/H SYSTEM - NORMAL OPERATION LOCAL PROCEDURE                NONE                  SAT 2-III-1.3.7        03 02 TURBINE AUTOMATIC TRIP            LOCAL PROCEDURE              NONE                  SAT MECHANISMS OPERATIONAL TESTS 2-III-1.3.8        06      GENERATOR STATOR WINDING        N/S                          ENTIRELY DIFFERENT.            M TEMPERATURE MONITORING                                        SYSTEMS ARE DIFFERENT 2-III-1. 3. 9      00      BUS COOLING SYSTEM              LOCAL PROCEDURE              NONE                  SAT 2-III-10.3.1        06 01 AUXILIARY FEEDWATER SYSTEM        NONE                          DIFFERENCES IN AF SAT OPERATION                                                    PUMP RUNOUT PROTECTION PRESSURE DIFFERENCE IN THE TURBINE DRIVEN SPEED DEMAND FOR 3450 RPM 2-III-11.3.1        02 01 STEAM GENERATOR FEED PUMP LUBE LOCAL PROCEDURE                  NONE                  SAT OIL SYSTEM - NORMAL OPERATION
* 2-III-11.3.2        02 01 STEAM GENERATOR FEED PUMP OIL N/S                              NONE                            N SEPARATOR OPERATION 2-III-12.3.1        03      TURBINE DRAINS, BLEED STEAM    NONE                          NONE                  SAT
 
---------------------------------- ------------------------
Page No. 37 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
AND HEATER DRAINS 2-III-12.3.2        01 01 RETURNING AFEED WATER HEATER N/S                                NONE                            N GROUP TO SERVICE 2-III-12.3.3        01      REMOVING AFEEDWATER HEATER      N/S                          NONE                            N GROUP FROM SERVICE 2-III-13.3.1        02      DRAINING THE STEAM GENERATOR    N/S                          UNIT 1 HAS STEPS TO            N NOTIFY CHEMISTRY PRIOR TO DRAINING RADIOACTIVE WATER TO H12 BLOWDOWN TANK 2-III-13.3.2        02 01 STEAM GENERATOR BLOWDOWN -        NONE                          NONE                SAT NORMAL OPERATION
* 2-III-14.3.1        03      HEATER VENTS AND MISCELLANEOUS LOCAL PROCEDURE                NONE                SAT DRAINS - NORMAL OPERATION 2-III-15.3.l        03      DEMINERALIZED WATER TRANSFER - LOCAL PROCEDURE              *UNIT 1 HAS CONTROL  SAT NORMAL OPERATION                                              OF PUMPS 2-III-16.3.l        03 01 MISCELLANEOUS CONDENSATE          N/S                          UNIT 2 ALLOWS THE              N SYSTEM - NORMAL OPERATION                                    MISC. COND. DUPLEX STRAINER TO BE BYPASSED FOR UP TO 12 HOURS 2-III-17.3.1        03      NITROGEN SYSTEM - NORMAL        N/S                          NONE                            N OPERATION 2-III-17.3.2        02 01 HYDROGEN SYSTEM - NORMAL          N/S                          NONE                            N OPERATION 2-III-2.3.1        04      MAIN, REHEAT AND TURBINE        LOCAL PROCEDURE              NONE                SAT BYPASS STEAM WARMUP 2-III-2.3.3        03      MOSITURE SEPARATOR REHEATERS - NONE                          SEC. 5.5 ONLY ON    SAT MANUAL OPERATION                                              UNIT 1 CONTAINS STEPS TO DRAIN 4TH PATH SIGHT GLASS
* 2-III-2.3.4        02      STEAM DUMP SYSTEM - NORMAL      NONE                          UNIT 2 HAS TABLE    SAT OPERATION                                                    SHOWING OPENING SEQUENCE
 
Page No. 38 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-III-3.3.1        03 03 MAIN TURBINE LUBRICATION OIL      LOCAL PROCEDURE              UNIT 1 HAS          SAT SYSTEM - NORMAL OPERATION                                    PRECAUTION TO ISOLATE 1, 9, &10 BRGS BEFORE PERFORMING B/U LIFT PUMP. UNIT 1 HAS EMERGENCY BRG OIL PUMP ALSO 2-III-3.3.2        02      MAIN TURBINE LUBE OIL          LOCAL PROCEDURE              SEC 5.1 - UNIT 1 HAS SAT PURIFICATION AND TRANSFER                                    STEPS TO VALVE IN A SYSTEM                                                        PRE FILTER. UNIT 1 HAS ADDITIONAL SECTION FOR TRANSFERRING LUBE OIL FROM THE TURBINE
* OIL M/U &RECEIVING TANK TO MTLO STORAGE TANKS.
2-III-4.3.1        03 02 TURBINE GLAND SEALING SYSTEM - LOCAL PROCEDURE                  UNIT 1 ESTABLISHES SAT NORMAL OPERATION                                              20-24 PSIA SEAL STEAM PRESSURE &
SAYS MAINTAIN IT DURING TURBINE LOADING UNIT 2 ESTABLISHES 18.7 TO 24.7 AND GIVES DETAILED STEPS HOW TO MAINTAIN IT DURING TURBINE LOADING 2-III-6. 3.1        03      TURBINE AUXILIARY COOLING      LOCAL PROCEDURE              NONE                SAT SYSTEM - NORMAL OPERATION 2-III-7 .3.1        04      CIRCULATING WATER SYSTEM -      NONE                          NONE                SAT NORMAL OPERATION 2-III-8.3.l        03      CONDENSER AIR REMOVAL SYSTEM - NONE                          NONE                SAT NORMAL OPERATION
* 2-III-9.3.1        04 01 PLACING FEED AND CONDENSATE      NONE                          NONE                SAT SYSTEMS IN SERVICE
 
                                      -----------~--------
Page No. 39 12/27/89
* SALEH SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-III-9.3.2        04 02 FEED PUMP OPERATION              NONE                          UNIT 1 HAS STEPS TO SAT REMOVE JUMPERS FROM SGFP CONTROL PANELS PRIOR TO STARTUP.
UNIT 1 PLACES BF40 CONTROLLER IN AUTO-MODE AFTER VALVE TEST UNIT 2 DOES IT BEFORE VALVE TEST UNIT 1 HAS OPERATOR VERIFY WOODWARD GOVERNOR ARM TRAVEL WHEN TURBINE LATCHED UNIT 1 HAS STEPS TO INSTALL JUMPERS IN
* SGFP CONTROL PANES AFTER SECURING 2-III-9.3.3        02      PLACING ASTEAM GENERATOR IN    N/S                            NONE                SAT        L WET LAYUP 2-III-9.3.4        01 01 PLACING THE CONDENSATE SYSTEM NONE                              UNIT 1 CHECKS FOR    SAT IN SERVICE FOR CLEANUP                                        REQUIRED SEAL FLOW ON CONDENSAT PUMP.
UNIT 2 DOESN'T 2-III-9.3.5        03      CONDENSATE PUMP STRAINER      LOCAL PROCEDURE                UNIT 1 DOESN'T HAVE SAT CLEANING &MECHANICAL SEAL                                    STEPS TO CLEAN MECH.
INJECTION FILTERCLEANING                                      SEAL INJECTION FILTER 2-III-9.3.6        00      FEED PUMP STRAINER CLEANING    LOCAL PROCEDURE                NONE                SAT 2-III-9.3.7        01 01 FEED PUMP TURBINE TESTING        N/S                            NONE                            N 2-IOP-1            02 01 REFUELING TO COLD SHUTDOWN      N/S                            NONE                            s 2-IOP-2            04 12 COLD SHUTDOWN TO HOT STANDBY    NONE                          NONE                SAT 2-IOP-3            06 13 HOT STANDBY TO MINIMUM LOAD      NONE                          NONE                SAT
* 2-IOP-4            04 04 POWER OPERATION                  NONE                          NONE                SAT 2- IOP-5            03 02 MINIMUM LOAD TO HOT STANDBY      NONE                          NONE                SAT
 
Page No. 40 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2- IOP-6            04      HOT STANDBY TO COLD SHUTDOWN    NONE                          NONE                SAT 2-IOP-7            03 02 COLD SHUTDOWN TO REFUELING        N/S                          NONE                            s 2-IOP-8            02 04 MAINTAINING HOT STANDBY          NONE                          NONE                SAT 2-IV-1.3.1          04 02 500KV BUS - NORMAL OPERATION      NONE                          NONE                SAT 2-IV-1.3.4          01      TAGGING OR RELEASING A500KV    NONE                          NONE                SAT CIRCUIT BREAKER 2-IV-1.3.5          01      5037 500KV LINE TRANSFERRING    N/S                          UNIT 2 ONLY          SAT TO THE SPARE PILOT WIRE 2-:IV-10.3.1        04 02 REMOVING RETURNING TO SERV & N/S                                NONE                SAT LOSS OF PROTECTIVE SYS CHANNEL
* 2-IV-11.3.1        04 03 RADIATION MONITORING SYSTEM      NONE                          UNITS 1 AND 2 HAVE  SAT NORMAL OPERATION                                              ENTIRELY DIFFERENT PROCEDURES BECAUSE THEY HAVE ENTIRELY DIFFERENT RMS SYSTEMS. UNIT 1 ONLY DETECTORS:
1R6A 1R8 1R21, I    I 1R43 UNIT 2 ONLY DETECTORS: 2R42A-D 2-IV-11.3.2        01 01 OPERATION OF THE RADIATION        NONE                          UNIT 2 ONLY          SAT MONITORING SYSTEM SAMPLERS 2-IV-12.3.3        01      TELEPHONE SYSTEM NORMAL AND    LOCAL PROCEDURE. NOT IN      UNIT 2 ONLY          SAT        s EMERGENCY POWER SUPPLY          DATABASE                      PROCEDURE 2-IV-15.3.2        02      BOOTSTRAPPING THE COMPUTER      LOCAL PROCEDURE              NONE                SAT 2-IV-15.3.3        01      START/STOP SEQUENCE FOR THE    LOCAL PROCEDURE              NONE                SAT COMPUTER 2-IV-16.3.l        04 01 EMERGENCY POWER - DIESEL          5.1 NONE                      NONE                SAT OPERATION                      5.2 LOCAL PROCEDURE
* 2-IV-2.3.1          03      GENERATOR SEAL OIL SYSTEM -    LOCAL PROCEDURE              OUTSIDE MCR SYSTEM  SAT NORMAL OPERATION                                              ENTIRELY DIFFERENT
 
Page No. 41 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT  UNIT 1 vs UNIT 2    VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
2-IV-2.3.2          07 01 GENERATOR GAS SYSTEM - NORMAL LOCAL PROCEDURE                  GE vs WGEN          SAT OPERATION 2-IV-2.3.3          03 01 STATOR COOLING SYSTEM - NORMAL LOCAL PROCEDURE                  GE vs WGEN          SAT OPERATION 2-IV-3.3.1          03      13KV BUS - NORMAL AND          NONE                          NONE                SAT ALTERNATE LINEUPS OF OPERATION 2-IV-4.3.1          03      VITAL INSTRUMENT BUS AND      LOCAL                          PROCEDURES ARE      SAT ALTERNATE SHUTDOWN                                            DIFFERENT UNIT 1 HAS NEW INVERTERS 2-IV-4.3.14        00      REMOVING/RETURNING #2          NONE                          UNIT 2 ONLY          SAT SWITCHYARD MISCELLANEOUS POWER TRANSFORMER TO/PROM SERVICE
* 2-IV-4.3.2          02      EMERGENCY PEED TO 2D VITAL    LOCAL PROCEDURE                UNIT 2 ONLY          SAT INSTRUMENT BUS 2-IV-4.3.3          01      4KV GROUP BUSES - NORMAL      NONE                          NONE                SAT OPERATION 2-IV-4.3.4          04      4KV VITAL BUSES - NORMAL      NONE                          NONE                SAT OPERATION 2-IV-4.3.5          02      OPERATION OP 460 VOLT BREAKERS LOCAL PROCEDURE                NONE                SAT 2-IV-4.3.6          00      OPERATION OP 4KV BREAKERS      LOCAL PROCEDURE                NONE                SAT 2-IV-4.3.7          02      LIGHTING DISTRIBUTION TRANSFER LOCAL PROCEDURE                PROCEDURE DIFFERENCE SAT SWITCH OPERATION                                              LIMITED TO NOTIFICATIONS OF DIFFERENT PEOPLE SERVED BY THE LIGHTING PANELS BEING OPERATED 2-IV-5.3.1          01      BATTERY GROUND DETECTION      LOCAL PROCEDURE                NONE                SAT 2-IV-5.3.2          03      BATTERY CHARGER OPERATION      LOCAL PROCEDURE                NONE                SAT
* 2-IV-5.3.3          03 01 DC BREAKER - ADMINISTRATIVE CONTROL
 
1-I I  Page No. 42 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT UNIT 1 vs UNIT 2      VALIDATED IMPACT
    =================== === === ============================== ============================== ==================== ========== ========
2-IV-6.3.1          02 01 OPERATION OF THE NUCLEAR          NONE                          NONE                SAT INSTRUMENTATION SYSTEM 2-IV-8.3.1          03 01 ROD CONTROL SYSTEM - NORMAL      LOCAL PROCEDURE              UNIT 2 HAS STEP 2.3 SAT OPERATION                                                    UNDER INITIAL COtlDITIONS TO PERFORM COS 1 OR 2.
UNIT 1 DOES NOT 2-IV-8.3.2          01      REACTOR TRIP OR REACTOR TRIP    LOCAL PROCEDURE              NONE                SAT BYPASS BREAKER OPERATION 2-IV.11.3.1        04 03 RADIATION MONITORING SYSTEM - NONE                              DIFFERENT SYSTEMS    SAT NORMAL OPERATION 2-V-l. 3.1          04      SERVICE WATER - NORMAL          NONE                          UNIT 2 PRECAUTIONS SAT
* 2-V-1. 3.2 OPERATION 00 04 SERVICE WATER SYSTEM - #21        N/S CAN'T DRAIN RCS TO ARE SLIGHTLY DIFFERENT BECAUSE 24 SWP HAS DIFFERENT OIL SIGHT GLASSES UNIT 2 REQUIRES ALL SAT        L NUCLEAR HEADER OUTAGE          CENTERLINE                    BVITAL RUSSES OPERABLE AND ENERGIZED. UNIT 1 ONLY REQUIRES AAND B
2-V-1.3.3          00 03 SERVICE WATER SYSTEM - #22        N/S. CAN'T DRAIN RCS TO                            SAT NUCLEAR HEADER OUTAGE          CENTERLINE 2-V-1.3.4          00      SHUTDOWN OF TOTAL UNIT 2        N/S                          UNIT 1 IN PURPOSE SAT SERVICE WATER SYSTEM                                          STATES THIS PROCEDURE WILL ONLY BE USED DURING THE 7TH REFUELING OUTAGE. IT CURRENTLY EXISTS ON BOTH UNITS. UNIT 1 LISTS 4 PRECAUTIONS THAT ARE RELEVENT TO
* BOTH UNITS BUT UNIT 2 DOESN'T HAVE THEM 2-V-13. 3.1        01 01 FILLING #21 AND/OR #22 FUEL      N/S                          UNIT 1 ONLY          SAT
 
Page No. 43 12/27/89
* SALEM SIMULATOR PROCEDURE LIST - UNIT 1 &UNIT 2 SORTED BY PROCEDURE NUMBER PROCEDURE NUMBER              REV ACN DESCRIPTION                    SIMULATOR vs REFERENCE PLANT UNIT 1 vs UNIT 2      VALIDATED IMPACT
  =================== === === ============================== ============================== ==================== ========== ========
OIL STORAGE TANK(SI 2-V-14.3.1          03      PLACING THE HEATING WATER      N/S                            UNIT 1 ONLY SYSTEM IN SERVICE 2-V-2.3.1          02      FRESH WATER SYSTEM - NORMAL    N/S                            UNIT I ONLY          SAT OPERATION                                                    PROCEDURE 2-V-3.3.1          03      FIRE PROTECTION SYSTEM        LOCAL PROCEDURE                NONE                SAT OPERATION 2-V-3. 3. 5        01      FILLING STATION CARDOX STORAGE LOCAL PROCEDURE                NONE                SAT TANKS 2-V-4.3.1          02      SERVICE AIR SYSTEM - NORMAL    LOCAL PROCEDURE                NONE                SAT OPERATION
* 2-V-5.3.1          02      CONTROL AIR SYSTEM OPERATION  NONE                          NONE                SAT 2-V-5.3.2          00      EMERGENCY CONTROL AIR          LOCAL PROCEDURE                INITIAL CONDITIONS SAT COMPRESSOR FLOW CAPACITY CHECK                                AND PRECAUTIONS ARE DIFFERENT.
PROCEDURES ARE DRAMATICALLY DIFFERENT. UNIT 1 PROCEDURE IS 5 YEARS NEWER THAN UNIT 2 2-V-5.3.4          00      OPERATION OF TEMPORARY AIR    LOCAL PROCEDURE                NONE                SAT COMPRESSORS 2-V-9.3.l          04 01 CHILLED WATER SYSTEM - NORMAL LOCAL PROCEDURE                  NONE                SAT OPERATION
* SP-206 HOPE CREEK & SALEM SIMULATOR Simulator Design Database
* Simulator Design Data Appendix 7 contains the simulator reference database listing all references used in the design, development and modification of the simulator. The database is comprised of the following fields:
SYSTEM identifies the system designator code for system identification TITLE identifies the system by title, e.g .. 125 VDC, Station Service Water, etc.
DRAWING identifies the drawing number where applicable. In some cases the vendor assigned drawing number is presented.
In cases where a drawing includes a cover sheet, only the cover sheet is listed: All applicable sheets of that drawing will be referenced on the cover sheet.
STATION REVISION identifies the revision number of the drawings as listed in the stat1on drawings database.
TRAINING LOAD (date)  identifies the revision of the drawings supporting the training load, and the date the load was created
* Database Maintenance The station revision column lists the drawing revision numbers as listed in the station drawing data base. This information is derived from the station's Management Information System and/or document distribution (library), and is updated during the Annual Review, or more frequently as directed by the Simulator Configuration Engineer.
* The training load column lists the revision number of each drawing that was used to develop the current training load. As further modifications are made, the work package developed (see SP~205) lists the drawings and revisions used. When the work package is completed and approved by the Simulator Configuration Engineer, the drawing revision number for the training load column is flagged for update for each applicable drawing. Each time a new training load is created, the drawings flagged for update and incorporated in the new load are updated in the data base *
* Appendix 7                  Date: 08/04/89 Page 1 of 1                Rev.: ~~o~~-
 
SP-206 HOPE CREEK SIMULATOR SIMULATOR DATA BASE
* AB AC Main Steam Main Turbine PLANT SYSTEM DESIGNATIONS AD Condensate AE Feedwater AF Extraction Steam, Heater Vents & Drains AK Condensate Demineralizer AM Fresh Water Supply AN Deroin Water Makeup, Storage & Transfer AP Condensate Storage and Transfer AQ Condensate and Feedwater Chemical Control AR Fresh Water Pretreatment
-* AX BB BC Hydrogen Water Chemistry Injection Nuclear Boiler and Reactor Recirculation Residual Heat Removal BD Reactor Core Isolation Cooling BE Core Spray BF Control Rod Drive Hydraulic Supply BG Reactor Water Cleanup BH Standby Liquid Control BJ High Pressure Coolant Injection BN Refueling Water Transfer CA Main Turbine Sealing Steam
., CB cc CD Main Turbine and Generator Lube Oil Main Generator Gas Control Main Generator Hydrogen Seal Oil Appendix 7              Date: 08/04/89 Page 1 of 6            Rev.: _ _o__
 
SP-206 CE Main Generator Stator Water Cooling
* CF CG CH Lube Oil Storage, Transfer, and Purification Condenser Air Removal Main Turbine Control Oil (EHC)
CJ RFP Turbine Lube Oil DA Circulating Water DB Cooling Water DD Circulating Water*Hypochlorination DE Circulating Water Acid Injection DF Cooling Tower Blowdown Dechlorination EA Station Service Water EC Fuel Pool Cooling and Cleanup ED Reactor Auxiliaries Cooling
* EE EG EP Torus Water Cleanup Safety and. Turbine Auxiliaries Cooling Service Water Screens & Backwash EQ Service Water Hypochlorination FA Auxiliary Boilers, FB Auxiliary Steam System FC RCIC Turbine Steam FD HPCI Turbine Steam FW RFP Turbine Steam G- HVAC Systems GA Plant Heating Steam GB Chilled Water I
* GC Administration Bldg HVAC Appendix 7                Date: 08/04/89 Page 2 of 6 .              Rev.: - -O- -
 
SP-206 GD  Fire Pump House HVAC
* GE GF GH Turbine Bldg HVAC Miscellaneous Buildings HVAC Radwaste Area HVAC GJ  Control Room Chilled Water GK  Control Room HVAC GL  Service Area BVAC I
GM  Diesel Generation Area HVAC GP  Primary Containment Leak Rate Test GQ  Intake Structure HVAC GR  Reactor Building HVAC GS  Containment Atmosphere Control GT  Drywell HVAC GU  Filtration, Recirculation & Ventilation (FRVS)
* H-HA HB Radwaste Gaseous Radwaste Liquid Radwaste HC  Solid Radwaste HD  Decontamination Facilities HG  Building & Equipment Drains Hll Main Control Panels (10C650, 651, 800)
H12 Back Panels (10C607, 399, 649, etc.)
JA  Auxiliary Boiler Fuel Oil Storage & Transfer JE  Diesel Fuel Oil Transfer & Storage KA  Service Compressed Air
* KB KC Instrument (Control) Air Fir~  Protection Appendix 7                  Date: 08/04/89 Page 3 of 6                Rev. : ---'-0_ _
 
SP-206 KD Domestic (Potable) Water
* KE KF KG Fuel Handling & Reactor Vessel Servicing Cranes, Hoists & Elevators Breathing Air KH Service Gases (CO 2 , N 2  &H 2 )
KJ Emergency Diesel Generators KL Containment Instrument Gas KP MSIV Steam Sealing...
LA Building Sewage LB Storm Drainage LD Chemical Waste LE Oily Waste LF Normal Drains
* LG Floor Water Collection LX CRD Maintenance M- Generation and Transmission MA Main Generator & Transformer~
MB Excitation and Voltage Regulation MC 13.8 KV Station Power MD Switchyard Buses ME Switchyard 125 VDC MF Switchyard Lighting & Auxiliary Power MH 500 KVAC N- Non-Safety Relayed Power Systems NA 7.2 KVAC NB 4.16 KVAC
-~ NG 480 VAC Substation Power Appendix 7              Date: 08/04/89 Page 4 of 6            Rev. : ---'-o__
 
SP-206 NH 480 V MCC Power
* NJ NK NQ 250 VDC 125 VDC 120 VAC P- Safety Related Power Systems PB 4.16 Kvac (Class lE)
PE Standby AC Power (Diesel Generator)
PG 480 VAC (Class 1E1 Substation Power PH 480 V (Class lE) MCC Power PJ 250 VDC (Class lE)
PK 125 VDC (Class lE)
PL 24 VDC (Class lE)
QA Normal Station Lighting
* QB QC QE Essential & Standby Lighting Yard, Roadway & Fence Lighting Public Off-Site Communication QF In-Plant Communication QG Site Grounding QH Cathodic Protection QJ Freeze Protection (Heat Tracing)
QK Fire & Smoke Detection QL Private Off-Site Communication QM Special Facilities RC Process Sampling RD Meteorological Instrumentation
* RG RH Plant Security Closed Circuit TV Appendix 7        Date: 08/04/89 Page 5 of 6      Rev.: - -O- -
 
SP-206 RJ  Plant Computer
* RK RL s-Plant Annunciator Control Complex Nuclear Controls and Monitoring SA  Redundant Reactivity Control SB  Reactor Protection SC  Reactor Instrumentation SD  Area Radiation Monitoring SE  Neutron Monitoring SF  Reactor Manual Control J
SG  Seismic Instrumentation SH  Post Accident Monitoring SK  Plant Leak Detection
* SL  Reactor Building Pressure Relief SM  Primary Containment Isolation SN  Automatic Depressurization SP  Process Radiation Monitoring SS  Rotating Machinery Vibration Monitoring ST  Transient  Monitoring SU  Radwaste Controis & Logic SV  Remote Shutdown VAR Various zz  No System Applicable
**                      Appendix 7            Date: 08/04/89 Page 6 of 6          Rev. : ----"-0_ _
 
SP-206 SALEM SIMULATOR SIMULATOR DATA BASE
* 0000 ClOO Undefined PLANT SYSTEM DESIGNATIONS Computer Systems CJOO  Annunciators - Visual And Console C310  Annunciators - Auxiliary C900  RMS
                              .
CDOO  Loose Parts Monitoring System EllO  A-C Power - 500 KV Yard E120  A-C Power - 13KV AC E130  A-C Power -  JKV AC E140  A-C Power - 460V AC
* E150  A-C Power - 230V AC
  . E153
* A-C Power - 115 AC                                        I E160  Transformers, Auxiliary Power I
I E170  Transformers, Station Power                                I 11 E180  Transformers, Main Power                                  11 E210  D-C Power - 28V DC E220  D-C Power - 125V DC E230  D-C Power - 250V DC E300  Diesel Generators E400  Gas Turbine (Unit 3)
E500  Generator, Main E540  Generator Stator CW Instr. & Controls E550  Generator & Aux. Temperature Scanning E555  Steam Generator Feed Pump & Turbine Lube Oil
*~  E560  Protective Relaying Appendix 7              Date: 08/04/89 Page 1 of 5              Rev.:    0
 
SP-206 E570 Generator Hydrogen & Seal Oil
* E570 Turbine Generator Hydrogen & SO (w/ Manual)
E580 Generator Synchronizing E580 Synchronizing E590 Bulk Carbon Dioxide Supply E595 Bulk Hydrogen Supply E600 Electrical Penetrations F300 Steam Generator F~ed  & Condensate F310 Steam Generator Level Control F320 Condenser Air Removal & Priming F400 Auxiliary Feedw.ater F530 FW Chemical Treatment F550 Condeniate Polishing F800 Condensate, Miscellaneous
* GlOO G216 Bleed Steam Heater Drains Steam Generator Drains & Blowdown G220 Main Steam & Turbine By-pass G220 Moisture Separator Reheater Steam & Drains HWOO Panel Hardware IAOO Instructor Aids MlOO Fresh Water MllO Water System - Potable M200 Fire Protection M255 Fuel Oil
* M510 Public Address System M600 SW System Appendix 7              Date: 08/04/89 Page 2 of 5              Rev.: - -O
                                                            ---
 
SP-206 M700      Building & Equipme.nt Drains, Flood & Sump Pumps
* M800      Heating Water M900      HVAC - Diesel Generator Area M910      HVAC - Aux. Building, Mechanical Area M910      HVAC - Aux. Building, Switchgear & Penetration M915      Chilled Water M921      HVAC - Control Area
:'19 2 2  HVAC - Fuel Handling Area
                            .
M930      HVAC - Service Building M940    .HVAC - Containment Building M941      HVAC - Containment Pressure - Vacuum Relief M941      HVAC - Iodine Removal System M942      HVAC - Reactor Nozzle Support Ventilation M943      HVAC - Rx Shield Ventilation
* M944 M945 M946 HVAC - Control Rod Drive Ventilation HVAC - Containment Fan Coil Units HVAC - Containment Penetration Cooling M948      Containment Pressure Rec'd, Ind., & Alarms M970      HVAC - Inner And Outer Penetration Area M980      HVAC - SW Intake Structure M985      HVAC ~ Turbine Generator Area MAOO      Heat Tracing MBOO      Compressed Air - Station Air MCOO      Compressed Air - Control Air MJOO      Heater Vents & Misc. Drains MJlO      Contaminated Equipment, Drains & Vents NlOO      Chemical & Volume Control System
* N210      Component Cooling System Appendix 7 Page 3 of 5 Date: 08/04/89 Rev.: - - -
 
SP-206 N220 RHR
* N230 Spent Fuel Pit Cooling N300 Fuel Handling N350 Filter Handling N400 Sampling System N510 Waste Disposal System  - Gas N520 Waste Disposal System  - Solid N530 Waste Disposal System - Liquid N600 SI System N620 Containment Spray P250 PMS RlOO Reactor Control & Protection R105 SEC
* R120 Rl40 R170 SSPS Process Alarm Interface Racks Status Panel (2RP4)
R200 Reactor Coolant R270 Reactor Coolant Pump Shaft Vibration Monitors R400 Instrumentation System, Nuclear R500 Reactor Rod Control R600 Pressurizer R650 Pressurizer Overpressurization R700 Reactor'Coolant Leak Detection TOOO Turbine (w/ Manual)
TlOO E-H Control
* TlOO Turbine EH Control T200 Turbine Drains Appendix 7                Date: 08/04/89 Page 4 of 5                Rev.: - -O
                                                              ---
 
SP-206 T300 Turbine Gland Seal Steam & Leakoff (Unit 2)
* T500 Turbine, Main, Lube Oil T700 Turbine, Main T800 Circulating Water System T900 Turbine Auxiliaries Cooling W200 Demineralized Water System W300 Waste Disposal System  J Non-RAD Chemical Liquid wcoo Water Chemistry X380 Hot Shutdown Station X390 Digital Clock & Megawatt Meter X500 Safety Parameters Display
**
*~
Appendix 7                  Date: 08/04/89 Page 5 of 5                  Rev . : _ __;O:.___
 
r----:--:--
Page No.
11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
          ------  ============================================================  ------- ======== ========
E520                                                                    108537  05      05 E520                                                                    108539  04      04 HWOO    AC POWER DISTRIBUTION (2CC1)                                  170255  01      01 HWOO    DC POWER DISTRIBUTION (2CC1)                                  170255  01      01 170256  01      01 HWOO    AC POWER DISTRIBUTION (2CC2)
HWOO    DC POWER DISTRIBUTION (2CC2)                                  170256  01      01 HWOO    AC POWER DISTRIBUTION (2CC3)                                  170257  01      01 HWOO    DC POWER DISTRIBUTION (2CC3)                                  170257  01      01 HWOO    AC POWER DISTRIBUTION (2RP1)                                  170258  01      01
* HWOO HWOO HWOO DC POWER DISTRIBUTION (2RP1)
AC POWER DISTRIBUTION (2RP2)
DC POWER DISTRIBUTION (2RP2) 170258 170259 170259 01 01 01 01 01 01 HWDO    AC POWER DISTRIBUTION (2RP3)                                  170260  01      01 HWOO    DC POWER DISTRIBUTION (2RP3)                                  170260  01      01 R170    AC POWER DISTRIBUTION (2RP4)                                  170261  01      01 R170    DC POWER DISTRIBUTION (2RP4)                                  170261  01      01 HWOO    AC POWER DISTRIBUTION (2RP5)                                  170262  01      01 HWOO    DC POWER DISTRIBUTION (2RP5)                                  170262  01      01 NO DRAWING                                                    170263 HWOO    AC POWER DISTRIBUTION (2RP7)                                  170264  01      01 Hl~OO    AC POWER DISTRIBUTION (2RP8)                                  170265  01      01
* HWOO    DC POWER DISTRIBUTION (2RP8)                                  170265  01      01 HWOO    AC POWER DISTRIBUTION (2RP9)                                  170266  01      01
 
Page No. 2 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
HWOO    AC POWER DISTRIBUTION (NUCLEAR INST. CABINET)                  170267  01      01 HWOO    DC POWER DISTRIBUTION (NUCLEAR INST. CABINET)                  17D267  01      01 HWOO    AC POWER DISTRIBUTION (FLUX MAPPING)                          170268  01      01 HWOO    AC POWER DISTRIBUTION (RADIATION MONITOR)                      170269  01      01 HWOO    DC POWER DISTRIBUTION (RADIATION MONITOR)                      17D269  01      01 HWOO    AC &DC POWER DISTRIBUTION (HYDROGEN RECOMBINER)                170270  01      01 HWDO    AC &DC POWER DISTRIBUTION (REACTIVITY COMPUTER)                170271  01      01 HWDD    AC &DC POWER DISTRIBUTION (SSPS)                              170272  Dl      01 E130    NO. 1 &2 GENERATORS MAIN TRANSFORMERS ONE LINE CONTROL        203000  23      23
* E130 E13D E14D NO. 1 406V GROUP BUSES ONE LINE NO. 1 46D VVITAL BUSES ONE LINE NO. 1 46DV &23D V VITAL BUS ONE LINE CONTROL 2D3DD1 2D3D02 2D3003 18 12 16 18 12 16 E550    GENERATORS INSTRUMENTS &METERS, D.C. SCHEMATIC, CONTROLS      203009  04      04 E550    GENERATOR INSTRUMENT &METERS, AC SCHEMATIC, CONTROLS          203011  19      19 E510    GENERATOR ISOLATION TRIP REG &BACK UP, DC SCHEMATIC,          203018  11      11 CONTROLS E130    1A &2A VITAL BUSES BUS DIFFERENTIAL PROTECTION                203019  12      12 E130    lB &2B VITAL BUSES BUS DIFFERENTIAL PROTECTION                203D20  11      11 E13D    lC &2C VITAL BUSES BUS DIFFERENTIAL PROTECTION                205021  12      12 E130    1A &2A 4160V VITAL BUSES lA &2A EMERGENCY DIESEL GEN.,        203035  OD      OD SCHEMATIC, CONTROLS
.,
E130    1C &2C 416DV VITAL BUSES lC &2C EMERGENCY DIESEL GEN.,        203036  00      DO SCHEMATIC, CONTROLS E130    lB &2B 416DV VITAL BUSES lB &2B EMERGENCY DIESEL GEN.,        203D38  DD      OD SCHEMATIC, CONTROLS
 
---------                                      ---
Page No. 3 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
E130      1A &2A 4160V VITAL BUSES UNDERVOLTAGE TRANSFER RELAY, A.C. 203047  20      20
            &D.C. SCHEMATIC, CONTROLS E130    lB &2B 4160V VITAL BUSES UNDERVOLTAGE TRANSFER RELAY, A.C. 203048  21      21
            &D.C. SCHEMATIC, CONTROLS E130    lC &2C 4160V VITAL BUSES UNDERVOLTAGE TRANSFER RELAY, A.C. 203049  21      21
            &D.C. SCHEMATIC, CONTROLS E130    NO. 2 460V VITAL BUSES ONE LINE                                203061  09      09 E130    NO. 2 460V VITAL BUSES ONE LINE                                203062  15      15 E140    460V &230V VITAL &NON-VITAL BUS ONE LINE CONTROL              203063  12      12 E130    4160V VITAL BUSES TYPICAL FEEDERS PROTECTION, A.C.            203101  04      04 SCHEMATIC, SHEET 1, CONTROLS
* E130 E130 E130 1A &2A 4160V VITAL BUSES BUS FEEDER llASD &21ASD,D.C.
SCHEMATIC, SHEET 1, CONTROLS 1A &2A 4160V VITAL BUSES BUS FEEDER 11ASD &21ASD 1A &2A 4160V VITAL BUSES BUS FEEDER 12ASD &22ASD 203102 203103 203105 11 17 16 11 17 16 E130    1A &2B 4160V VITAL BUSES BUS FEEDER llBSD &21BSD              203107  16      16 E130    1B &2B 4160V VITAL BUSES BUS FEEDER 12BSD &22BSD, D.C.        203108  11      11 SCHEMATIC, SHEET 1, CONTROLS E130    lB &2B 4160V VITAL BUSES BUS FEEDER 12BSD &22BSD, D.C.        203109  17      17 SCHEMATIC, SHEET 2, CONTROLS E130    lC &2C 4160V VITAL BUSES BUS FEEDER llCSD &21CSD, D.C.        203110  11      11 SCHEMATIC, SHEET 1, CONTROLS E130    lC &2C 4160V VITAL BUSES BUS FEEDER llCSD &21CSD, D.C.        203111  17      17 SCHEMATIC, SHEET 2, CONTROLS E130    lC &2C 4160V VITAL BUSES BUS FEEDER 12CSD &22CSD, D.C.        203112  11      11 SCHEMATIC, SHEET 1, CONTROLS NO. 1 &2 lC &2C 4160V VITAL BUSES BUS FEEDER 12CSD &22CSD      203113  17
* E130                                                                                    17 El30    lA &2A 4160V VITAL BUSES 4160V/480-240V TRANSF BKRS 1A4D &    203114  12      12 2A4D, DC SCHEMATIC, CONTROLS
 
Page No.      4 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION    LOAD SYSTEM        TITLE                                                                  DRAWING REVISION    11/01/89
                ============================================================                  ========    ========
E130          1B &2B 4160V VITAL BUSES 4160V/480-240V TRANSF BKRS 1B4D &            203115  12          12 2B4D, DC SCHEMATIC, CONTROLS E130          1C &2C 4160V VITAL BUSES 4160/480-240V TRANSF BKRS 1C4D &              203116  12          12 2C4D, DC SCHEMATIC, CONTROLS E550          22 STA. PWR. VOLTMETER SWITCHING &INDICATION, SCHEMATIC,              203121  02          02 CONTROLS E130          STATION &AUXILIARY POWER TRANSFS. &4160V. VITAL &GROUP                203122  05          05 BUS VOLTMETERS, D.C. SCHEMATIC, CONTROLS E130          4160V. GROUP BUSES TYPICAL FEEDERS PROTECTION, A.C.                    203132  06          06 SCHEMATIC, SHEET 1, CONTROLS E130- - - --4-160V-. GROUP BUSES TYPICAl.:---FEIDERS PROTECTION, A. C.      - --- - 203133    - -- -- - -
SCHEMATIC, SHEET 2, CONTROLS
* E130          lH &2H 4160V GROUP BUS, BUS FEEDER C.B. 11HSD &21HSD, D.C.            203134  07          07 SCHEMATIC, SHEET 1, CONTROLS E130          lH &2H 4160V GROUP BUS, BUS FEEDER llHSD &21HSD, D.C.                  203135  11          11 SCHEMATIC, SHEET 2, CONTROLS E130          lH &2H 4160V GROUP BUSES, BUS FEEDER 1AHGD &2AHGD, D.C.                203136  05          05 SCHEMATIC, SHEET 1, CONTROLS E130          lH &2H 4160V GROUP BUSES, BUS FEEDER 1AHGD &2AHGD, D.C.                203137  09          09 SCHEMATIC, SHEET 2, CONTROLS E130          lE &2E 4160V GROUP BUSES, BUS FEEDER 11ESD &21ESD, D.C.                203138  07          07 SCHEMATIC, SHEET 1, CONTROLS E130          lE &2E 4160V GROUP BUSES, BUS FEEDER 11ESD &21ESD, D.C.                203139  11          11 SCHEMATIC, SHEET 2, CONTROLS E130          lE &2E 4160V GROUP BUSES, BUS FEEDER 1AEDG &2AEGD, D.C.                203140  05          05 SCHEMATIC, SHEET 1, CONTROLS E130          1E &2E 4160V GROUP BUSES, BUS FEEDER lAEDG &2AEGD, D.C.                203141  09          09 SCHEMATIC, SHEET 2, CONTROLS 1F &2F 4160V GROUP BUSES, BUS FEEDER 12FSD &22FSD, D.C.                203142  07          07
* E130 SCHEMATIC, SHEET 1, CONTROLS E130          1F &2F 4160V GROUP BUSES, BUS FEEDER 12FSD &22FSD, D.C.                203143  11          11 SCHEMATIC, SHEET 2, CONTROLS
 
Page No.      5 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION      LOAD SYSTEM      TITLE                                                                  DRAWING      REVISION      11/01/89
                            ============================================================                          ========      ========
E130        1F &2F 4160V GROUP BUSES, BUS FEEDER 1BFGD &2BFGD, D.C.                203144        05            05 SCHEMATIC, SHEET 1, CONTROLS E130        1F &2F 4160V GROUP BUSES, BUS FEEDER 1BFGD &2BFGD, D.C.                203145        09            09 SCHEMATIC, SHEET 2, CONTROLS E130        1G &2G 4160V GROUP BUSES, BUS FEEDER 12GSD &22GSD, D.C.                203146        07            07 SCHEMATIC, SHEET 1, CONTROLS E130        1D &2D 4160V GROUP BUSES, BUS FEEDER 12GSD &22GSD, D.C.                203147        12            12 SCHEMATIC, SHEET 2, CONTROLS E130        1G &2G 4160V GROUP BUSES, BUS FEEDER lBGGD &2BGGD, D.C.                203148        04            04 SCHEMATIC, SHEET 1, CONTROLS
------ - ---- -E-130-----1G--&-2G-H60V- GROUP--BUSES,--BUS--~EEDER-lBGGD -&- 2BGGD,--D. C. --- - - -203149- - -- - --- - - ---- -- -- ---- - - -
SCHEMATIC, SHEET 2, CONTROLS
* T100 TlOO 11 &21 TURBINE HYDRAULIC FLUID PUMP, A.C. &D.C. SCHEMATIC, SHEET 1, CONTROLS 11 &21 TURBINE HYDRAULIC FLUID PUMP, A.G. &D.C. SCHEMATIC, SHEET 2, CONTROLS 203150 203151 07 04 07 04 T100        12 &22 TURBINE HYDRAULIC FLUID PUMP, A.C. &D.C. SCHEMATIC,              203152        07            07 SHEET 1, CONTROLS TlOO        12 &22 TURBINE HYDRAULIC FLUID PUMP, A.C. &D.C. SCHEMATIC,              203153        04            04 SHEET 2, CONTROLS E570        HIGH PRESSURE SEAL OIL BACK-UP PUMP, AC &DC SCHEMATIC,                  203154        07            07 CONTROLS TODD        TURBINE VACUUM BREAKER VALVES, AC &DC SCHEMATIC, CONTROLS              203155        07            07 T700        TURBINE TURNING GEAR, AC &DC SCHEMATIC, CONTROLS                        203156        07            07 F600        12 &22 HEATER DRAIN PUMPS, DC SCHEMATIC, SHEET 1, CONTROLS              203157        07            07 T700        BEARING OIL HYDRAULIC LIFT PUMP, AC &DC SCHEMATIC, CONTROLS            203158        09            09 T500        TURBINE AUXILIARIES ALARMS, AC &DC SCHEMATIC, CONTROLS                  203159        12            12
* SCHEMATIC, CONTROLS T500        AUXILIARIES BEARING OIL PUMP, AC &DC SCHEMATIC, CONTROLS                203160        12            12
 
Page No. 6 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
F600    11 &21 HEATER DRAIN PUMPS, DC SCHEMATIC, SHEET 1, CONTROLS    203161  08      08 T500    EMERGENCY BEARING OIL PUMP, D.C. SCHEMATIC, CONTROLS          203162  08      08 MCOO    1 &2 EMERGENCY CONTR. AIR COMPRESSORS, SCHEnATIC, SHEET 1,    203164  H        14 CONTROLS MCOO    1 &2 EMERGENCY CONTR. AIR COMPRESSORS, SCHEMATIC, SHEET 2,    203165  11      11 CONTROLS F600    11 &21 HEATER DRAIN PUMPS, SCHEMATIC, SHEET 2, CONTROLS        203166  03      03 F600    12 &22 HEATER DRAIN PUMPS, SCHEMATIC, SHEET 2, CONTROLS        203167  03      03 F600    13 &23 HEATER DRAIN PUMPS, SCHEMATIC, SHEET 1, CONTROLS        203168  07      07 F600    13 &23 HEATER DRAIN PUMPS, SCHEMATIC, SHEET 2, CONTROLS        203169  03      03
* T100 E130 TURBINE STOP &GOVERNOR VALVES TEST, A.C. SCHEMATIC, CONTROLS 1H &2H 4160V GROUP BUSES 4160/208V TRANSFORMERS FOR 1E6D &
2E6D, D.C. SCHEMATIC, CONTROLS 203170 203293 09 04 09 04 E130    1E &2E 4160V GROUP BUSES 4160/480-240V TRANSFORMERS FOR        203294  05      05 1H5D &2H5D, D.C. SCHEMATIC, CONTROLS E130    1E &2E 4160V GROUP BUSES 4160/480V TRANSFORMERS FOR C.B.      203295  05      05 1E6D &2E6D, D.C. SCHEMATIC, CONTROLS E130    1F 4160V GROUP BUS 4160/480 - 208V TRANSFS FOR C.B. 1FC        203296  03      03 E130    1F &2F 4160V GROUP BUSES 4160/480-240 TRANSFORMERS FOR C.B. 203297  05      05 1F5D &2F5D, D.C. SCHEMATIC, CONTROLS E130    1F 4160V GROUP BUS 4160/208V TRANSF. FOR CB 1F6D              203298  04      04 E130    1G &2G 4160V GROUP BUSES 4160/480V TRANSFORMERS FOR C.B.      203299  05      05 1G6D &2G6D, D.C. SCHEMATIC, CONTROLS G100    11 &21 BLEED STEAM COIL DR. TK. PUMPS, SCHEMATIC, SHEET 1,    203307  06      06 CONTROLS
* G100    11 &21 BLEED STEAM COIL DR. TK. PUMPS, SCHEMATIC, SHEET 2, CONTROLS 203308  03      03
 
                  -------------                                    ----------                      ------
Page No. 7 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
F400    11 &21 AUXILIARY FEED PUMPS, AC &DC SCHEMATIC, SHEET 2,        203312  22      22 CONTROLS F400    AUX. FEED STORAGE TANK LEVEL lA &2A AUX. F.W. TEMP. &          203313  10      10 SUCTION PRESS. ALARMS, SCHEMATIC, CONTROLS F400    12 &22 AUX. FEEDPUMPS, AC &DC SCHEMATIC, CONTROLS              203315  24      24 F400    21 AUXILIARY FEED PUMP, SCHEMATIC, CONTROLS                    203316  09      09 F400    22 AUXILIARY FEED PUMP, SCHEMATIC, CONTROLS                    203317 F400    13 &23 AUX. FEED PUMPS &TURBINES, SCHEMATIC, SHEET 1,          203318  10      10 CONTROLS F400    13 &23 AUX. FEED PUMPS &TURBINES, SCHEMATIC, SHEET 1,          203319  19      19 CONTROLS
* F700 F700 11 &21 SGFP &TURB. 11A &21A OIL PUMP, AC &DC SCHEMATIC, CONTROLS 11 &21 SGFP &TURB. llB &21B OIL PUMP, AC &DC SCHEMATIC, CONTROLS 203320 203321 07 08 07 08 F700    11 &21 SGFP &TURB. EMERGENCY OIL PUMP, DC SCHEMATIC,          203322  09      09 CONTROLS F700    11 &21 SGFP &TURBINES TURN GEAR VAPOR SEPARATOR, AC            203323  08      08 SCHEMATIC, CONTROLS F700    11 &21 SGFP &TURBINES GOV CONTROL &SUPERV INSTRUMENT, AC      203324  17      17 SCHEMATIC, CONTROLS F700    11 &21 SGFP &BY PASS VALVES, AC SCHEMATIC, CONTROLS            203325  06      06 F700    11 &21 SGFP &TURBINES, SCHEMATIC, SHEET 1, CONTROLS            203326  11      11 F700    11 &21 SGFP &TURBINE, DC SCHEMATIC, SHEET 2, CONTROLS          203327  23      23 F700    11 &21 SGFP &TURBINES, DC SCHEMATIC, SHEET 3, CONTROLS        203328  10      10 F700    11 &21 SGFP &TURBINES, DC SCHEMATIC, SHEET 4, CONTROLS        203329  16      16
* F700    12 &22 SGFP TURBINE, 12A &22A OIL PUMPS, AC-DC SCHEMATIC, CONTROLS 203330  06      06
_j
 
Page No. 8 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
    ------  ============================================================  ------- ======== ========
* F700    12 &22 SGFP &TURBINE, 12B &228 OIL PUMPS, AC-DC                203331  06      06 SCHEMATIC, CONTROLS F700    12 &22 SGFP TURB. EMERGENCY OIL PUMP, DC SCHEMATIC,            203332  07      07 CONTROLS F700    12 &22 SGFP &TURBINE TURNING GEAR, VAPOR EXTRACTOR &OIL        203333  07      07 SEPARATOR, AC SCHEMATIC, CONTROLS F700    12 &22 SGFP &TURB. GOV. CONT. &SUPERVISORY                    203334  16      16 INSTRUMENTATION, AC SCHEMATIC, CONTROLS F700    12-22 SGFP &TURBINE SUCTION BY-PASS VALVES, SCHEMATIC,        203335  05      05 CONTROLS F700    12 &22 SGFP &TURBINES, SCHEMATIC, SHEET 1, CONTROLS            203336  10      10
* F700    12 &22 SGFP &TURBINES, DC SCHEMATIC, SHEET 2, CONTROLS        203337  23      23 F700    12 &22 SGFP &TURBINES, DC SCHEMATIC, SHEET 3, CONTROLS        203338  10      10 F700    12 &22 SGFP &TURBINES, AC SCHEMATIC, SHEET 4, CONTROLS        203339  13      13 F200    11 &21 CONDENSATE PUMPS, AC &DC SCHEMATIC, CONTROLS            203340  17      17 F200    11 &21 CONDENSATE PUMPS, AC &DC SCHEMATIC, CONTROLS            203341  17      17 F200    13 &23 CONDENSATE PUMPS, AC &DC SCHEMATIC, CONTROLS            203342  17      17 F700    11 &21 SGFPS FEEDWATER FLOW RECIRCULATION, ANALOG              203345  09      09 SCHEMATIC, CONTROLS F700    12 &22 SGFPS FEEDWATER FLOW RECIRCULATION, ANALOG              203346  06      06 SCHEMATIC, CONTROLS R600    lGP 2GP 480V BUS PRESSURIZER HTRS. CONTROLLED GROUP, AC &DC    203347  07      07 SCHEMATIC, CONTROLS R600    1GP &2GP 480V BUS PRESSURIZER HTRS. 11 &21 BACK-UP, AC &      203348  07      07 DC SCHEMATIC, CONTROLS R600    lEP &2EP 480V BUS PRESSURIZER HTRS. 12 &22 BACK-UP GRP.,      203349  09      09 AC &DC SCHEMATIC, CONTROLS
* F500    11 &12, 21 &22 SG FEEDWATER CONTROL VALVE, SCHEMATIC, CONTROLS 203360  04      04
 
Page No. 9 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number .
TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
F500    13 &14, 23 &24 SG FEEDWATER CONTROL VALVE, SCHEMATIC,          203361  04      04 CONTROLS F500    11 &12, 21 &22 SG FW BY-PASS VALVE, SCHEMATIC, CONTROLS        203362  11      11 F500    13 &14, 23 &24 SG FW BY-PASS VALVE, SCHEMATIC, CONTROLS        203363  11      11 F500    11 &12, 21 &22 SG FW STOP VALVE, SCHEMATIC, CONTROLS            203364  10      10 F500    13 &14, 23 &24 SG FW STOP VALVE, SCHEMATIC, CONTROLS            203365  10      10 F500    11-14, 21-24 CONTROL &BY-PASS VALVE SCHEMATIC, CONTROLS        203366  06      06 F400    13 &23 AUX. F.W. PUMP SPEED CONTROL, SCHEMATIC, CONTROLS        203367  07      07 R200    REACTOR COOLANT SYSTEM PRESSURE CONTROLS, SCHEMATIC,            203368  02      02 CONTROLS
* G210 G210 G210 STEAM DUMP CONTROL, SCHEMATIC SHEET 1, CONTROLS STEAM DUMP VALVES CONTROL, SCHEMATIC, CONTROLS STEAM DUMP CONTROL, SCHEMATIC SHEET NO. 2, CONTROLS 203370 203371 203372 07 09 11 07 09 11 M800    HEATING STEAM SUPPLY TO SGFP TURBINE CONTROL VALVES,            203379  02      02 SCHEMATIC, CONTROLS F500    11A-12C, 21A-22C LOW PRESSURE FEED WATER HEATER INLET          203380  04      04 VALVES, SCHEMATIC, CONTROLS F500    13A-15C,23A-25C LOW PRESSURE FEEDWATER HEATER INLET VALVES      203381  04      04 SCHEMATIC, CONTROLS F500    11A-15C,21A-25C LOW PRESSURE FEEDWATER HEATER BYPASS VALVES,    203382  04      04 SCHEMATIC, CONTROLS F500    16A-16C,26A-26C HIGH PRESSURE FEEDWATER HEATER INLET VALVES    203384  06      06 SCHEMATIC, CONTROLS F500    16A-16C,26A-26C HIGH PRESSURE FEEDWATER INLET VALVES &          203385  07      07 BYPASS VALVES, SCHEMATIC, CONTROLS FEEDWATER HEATER BYPASS VALVES POSITION INDICATION DRAINS      203386  05      05
* F500 DISCHARGE FLOW LEVEL, SCHEMATIC, CONTROLS R600    PRESSURIZER RELIEF TANK VENT &GAS ANALYZER VALVES, AC &DC,      203387  13      13 SCHEMATIC, CONTROLS
 
                                              ---              ---  ----~--------------------
Page No. 10 11/28/89 SALEM SIMULATOR Simulator Design Database
* SYSTEM
  ------
TITLE Sorted by Drawing Number
          ============================================================
DRAWING
                                                                          -------
STATION REVISION
                                                                                  ========
TRAINING LOAD 11/01/89
                                                                                            ========
R600    PRESSURIZER RELIEF TANK SPRAY LINE &N2 !SOL. VALVE DRAIN        203388  07      07 SPRAY &GAS ANALYZER VALVES, DC SCHEMATIC, SHEET 1, CONTROLS R600    PRESSURIZER RELIEF TANK SPRAY LINE &N2 ISOL. VAS. DRAIN        203389  10      10 SPRY &GAS ANALYZER VALVES, DC SCHEMATIC, CONTROLS F500    FEEDWATER HEATERS LEVEL, FW HTRS BYPASS VA. POS. IND &F.W.      203394  02      02 HTRS DRAIN COOLERS OUTLET FLOW, SCHEMATIC, CONTROLS G210    MAIN STEAM DRAIN VALVES 11, 12, 21 &22 MS26, D.C.              203395  03      03 SCHEMATIC, CONTROLS G216    11-14 SG BLOWDOWN ISOLATION VALVES, SCHEMATIC, CONTROLS        203405  02      02 G216    11-14 SG BLOWDOWN ISOLATION VALVES, SCHEMATIC, CONTROLS        203406  10      10 G216    12 &22 BLOWDOWN TANKS LEVEL CONTROL &INDICATION,                203407  08      08
* SCHEMATIC, CONTROLS F400    AUXILIARY F.W. SYS SUCTION PRESSURE, ALT sue PRESS &STORAGE    203408  05      05 TANK LEVEL INDICATION, SCHEMETIC, CONTROLS F400    AUX FEED SUCTION &DISCHARGE PRESS. TRANSMITTER, SCHEMATIC,      203410  09      09 CONTROLS F400    11-12, 21-22AF21 STEAM GENERATOR INLET VALVES, AC &DC          203411  13      13 SCHEMATIC, CONTROLS F400    13-14, 23-24AF21 STEAM GENERATOR INLET VALVES, AC &DC          203412  14      14 SCHEMATIC, CONTROLS F400    11-14, 21-24AF11 STEAM GENERATOR INLET VALVES, SCHEMATIC,      203413  13      13 SHEET 1, CONTROLS F400    11-14, 21-23AF11 STEAM GENERATOR INLET VALVES, AC SCHEMATIC,    203414  02      02 CONTROLS G210    MAIN STEAM NO. 11, 12, 21 &22 SG ISOLATION VALVES,              203415  11      11 SCHEMATIC, CONTROLS G210    MAIN STEAM NO. 13, 14, 23 &24 SG ISOLATION VALVES,              203416  11      11 SCHEMATIC, CONTROLS
* G210    MAIN STEAM NO. 11, 12, 21 &22 SG DRAIN &WARM-UP VALVE, SCHEMATIC, CONTROLS 203U7  12      12
 
Page No. 11 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
G210    MAIN STEAM NO. 13, 14, 23 &24 SG DRAIN &WARM-UP VALVE,        203418  12      12 SCHEMATIC, CONTROLS G210    MAIN STEAM NO. 11, 12, 13, 14, 21, 22, 23 &24 SG STOP          203419  14      14 VALVES, SCHEMATIC, CONTROLS G210    MAIN STEAM NO. 11, 12, 13, 14, 21, 22, 23 &24 SG STOP          203420  13      13 VALVES, SCHEMATIC, CONTROLS G210    FEEDWATER NO. 11 SG. FEEDWATER FLOW CH. SELECTION,            203425  03      03 SCHEMATIC, CONTROLS G210    FEEDWATER NO. 12 SG. FEEDWATER FLOW CH. SELECTION,            203426  03      03 SCHEMATIC, CONTROLS G210    FEEDWATER NO. 13 SG. FEEDWATER FLOW CH. SELECTION,            203427  03      03 SCHEMATIC, CONTROLS
* G210 R600 FEEDWATER NO. 14 SG. FEEDWATER FLOW CH. SELECTION, SCHEMATIC, CONTROLS PRESSURIZER LEVEL RECORDER CHANNEL SELECTION, SCHEMATIC, CONTROLS 203428 203429 03 04 03 04 R200    REACTOR COOLANT SYS. PRESS. CONT. &RECORDER CHANNEL            203430  04      04 SELECTION, SCHEMATIC, CONTROLS G216    SG BLOWDOWN SYSTEM, NO. 11 &21 BLOWDOWN TANK INLET VALVE,      203431  06      06 SCHEMATIC, CONTROLS G216    SG BLOWDOWN SYS. NO. 11 &21 BLWDN. TK. INLET VALVES,          203432  06      06 SCHEMATIC, CONTROLS G216    SG BLOWDOWN SYS. NO. 12 &22 BLWDN. TK. INLET VALVES,          203433  07      07 SCHEMATIC, CONTROLS G216    SG BLOWDOWN SYS. NO. 12 &22 BLWDN. TK. INLET VALVES,          203434  15      15 SCHEMATIC, CONTROLS G216    SG BLOWDOWN SYS. NO. 11-14 &21-24 SG BLOWDOWN FLOW IND.,      203435  07      07 SCHEMATIC, CONTROLS SG BLOWDOWN SYS. NO. 1&2 SG BLOWDOWN TRANSFER PUMP,            203436  04      04
* G216 SCHEMATIC, CONTROLS G216    SG BLOWDOWN SYS. NO. 1&2 SG BLOWDOWN TRANSFER PUMP,            203437  08      08 SCHEMATIC, CONTROLS
 
Page No. 12 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                            DRAWING REVISION 11/01/89
          ============================================================            ======== ========
G216    SG BLOWDOWN SYS. NO. 11&21 BLOWDOWN TANKS LVL. &PRESS            203438  06      06 ALARMS &INDICATION, SCHEMATIC, CONTROLS G216    SG BLOWDOWN SYS. NO. 11&21 SLOWDOWN TANKS LVL. &PRESS            203439  05      05 ALARMS &INDICATION, SCHEMATIC, CONTROLS G210    MAIN NO. 11, 12, 13 &H S.G. STOP VALVES, 3 PCS.                  203470  09      09 MAINTENANCE VALVES, SCHEMATIC, CONfROLS G210    MAIN STM. ISO. ALARMS &INDICATION SCHEM, CONTRS, SCHEMATIC,      203484  03      03 CONTROLS R600    PRESSURIZERS NO. 11 &21 SPRAY CONTROL VALVES, SCHEMATIC,        203488  04      04 CONTROLS R600    PRESSURIZERS NO. 12 &22 SPRAY CONTROL VALVES, SCHEMATIC,        203489  05      05 CONTROLS
* F700    NO. 12 &22 S.G.F.P. &TURBINE NO. 12 &22 FEED PUMP SPEED,        203490  01      01 SCHEMATIC, CONTROLS F700    NO. 11 &21 S. G. F. P. & TURBINE NO. 11 &21 FEED PUMP SPEED,    203491  DO      00 SCHEMATIC, CONTROLS F700    NO. 11, 12, 21 & 22 S.G.F.P. TURBINE NO. 11, 12, 21  & 22      203492  00      00 FEED PUMPS SPEED DEMAND, SCHEMATIC, CONTROLS G210    MAIN STEAM, MAIN STEAM PRESSURE, SCHEMATIC, CONTROLS            203493  01      01 G220    REHEAT STEAM SYS, NO. 11E, 12E&W, 13E&W MSR &MAIN STM, COIL      203495  02      02 DRAINS FLOW TRANSMITTERS, SCHEMATIC, CONTROLS G210    MAIN STEAM 11, 12, 21 &22 STOP VALVES HYDRAULIC PUMPS,          2034 96 21      21 SCHEMATIC, CONTROLS G210    MAIN STEAM 13, 14, 23 &24 STOP VALVES HYDRAULIC PUMPS,          203497  18      18 SCHEMATIC, CONTROLS M910    AUX. BLDG. VENT. EXHAUST FILTER UNITS, SCHEMATIC, CONTROLS      203550  06      06 M910    AUX. BLDG. VENT. EXHAUST FILTER UNITS, SCHEMATIC, SHEET 2,      203551  06      06 CONTROLS
* M910 M940 AUX. BLDG. VENT. EXHAUST FILTER UNITS, SCHEMATIC, CONTROLS CONTAINMENT VENT. PURGE AIR INSIDE ISOL. VALVES, SCHEMATIC, CONTROLS 203552 203553 09 11 09 11
 
Page No. 13 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Dra~ing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
M940    CONTAINMENT VENT. PURGE AIR OUTSIDE ISOL. VALVES, SCHEMATIC,    203554  11      11 CONTROLS M910    AUX. BLDG. VENT. NO. 11 & 21 SUPPLY UNITS, SCHEMATIC,          203555  08      08 CONTROLS M910    AUX. BLDG. VENT. NO. 11 & 21 SUPPLY UNITS, SCHEMATIC,          203556  11      11 CONTROLS M910    AUX. BLDG. VENT. NO. 12 &22 SUPPLY UNITS, SCHEMATIC,            203557  08      08 CONTROLS M910    AUX. BLDG. VENT. NO. 12 &22 SUPPLY UNITS, SCHEMATIC,            203558  10      10 CONTROLS M910    AUX. BLDG. VENT. NO. 11 &21 EXHAUST FANS, SCHEMATIC,            203559  09      09 CONTROLS
* M910 M910 AUX. BLDG. VENT. NO. 12 &22 EXHAUST FANS, SCHEMATIC, CONTROLS AUX. BLDG. VENT. NO. 13 &23 EXHAUST FANS, SCHEMATIC, CONTROLS 203560 203561 09 09 09 09 M921    FUEL HNDLG. AREA VENT. NO. 1 &2 SUPPLY UNITS, SCHEMATIC,        203562  07      07 CONTROLS M921    FUEL HNDLG. AREA VENT. NO. 1 &2 SUPPLY UNITS, SCHEMATIC,        203563  06      06 CONTROLS M921    FUEL HNDLG. AREA VENT. NO. 11 &21 EXHAUST FANS, SCHEMATIC,      203564  08      08 CONTROLS M921    FUEL HNDLG. AREA VENT. NO. 12 &22 EXHAUST FANS, SCHEMATIC,      203565  08      08 CONTROLS M921    FUEL HNDLG. AREA VENT. NO. 11, 12, 21 &22 EXHAUST FILTER        203566  09      09 UNITS, SCHEMATIC, CONTROLS M940    CONT. VENT. NO. 11 &21 FAN-COIL UNITS, SCHEMATIC, CONTROLS      203567  07      07 M940    CONT. VENT. NO. 11 &21 FAN-COIL UNITS, SCHEMATIC, CONTROLS      203568  06      06
* M940 M940 CONT. VENT. NO. 11 &21 FAN-COIL UNITS, SCHEMATIC, CONTROLS CONT. VENT. NO. 11 &21 FAN-COIL UNITS, SCHEMATIC, CONTROLS 203569 203570 14 23 14 23
 
                                              -  ----                -- - ------
Page No. 14 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                              DRAWING REVISION 11/01/89
  ------  ============================================================        ------- ======== ========
M940    CONT. VENT. NO. 12 &22 FAN-COIL UNITS, SCHEMATIC, CONTROLS          203571  07      07 M940    CONT. VENT. NO. 12 &22 FAN-COIL UNITS, SCHEMATIC, CONTROLS          203572  06      06 M940    CONT. VENT. NO. 12 &22 FAN-COIL UNITS, SCHEMATIC, CONTROLS          203573  15      15 M940    CONT. VENT. NO. 12 &22 FAN-COIL UNITS, SCHEMATIC, CONTROLS          203574  24      24 M940    CONT. VENT. NO. 13 &23 FAN-COIL UNITS, SCHEMATIC, CONTROLS          203575  07      07 M940    CONT. VENT. NO. 13 &23 FAN-COIL UNITS, SCHEMATIC, CONTROLS          203576  06      06 M940    CONT. VENT. NO. 13 &23 FAN-COIL UNITS, SCHEMATIC, CONTROLS          203577  15      15 M940    CONT. VENT. NO. 13 &23 FAN-COIL UNITS, SCHEMATIC, CONTROLS          203578  24      24 M940    CONT. VENT. NO. 14 &24 FAN-COIL UNITS, SCHEMATIC, CONTROLS          203579
* M940 M940 M940 CONT. VENT. NO. 14 &24 FAN-COIL UNITS, SCHEMATIC, CONTROLS CONT. VENT. NO. 14 &24 FAN-COIL UNITS, SCHEMATIC, CONTROLS CONT. VENT. NO. 14 &24 FAN-COIL UNITS, SCHEMATIC, CONTROLS 203580 203581 203582 14 24 14 24 M940    CONT. VENT. NO. 15 &25 FAN-COIL UNITS, SCHEMATIC, CONTROLS          203583  07      07 M940    CONT. VENT. NO. 15 &25 FAN-COIL UNITS, SCHEMATIC, CONTROLS          203584  07      07 M940    CONT. VENT. NO. 15 &25 FAN-COIL UNITS, SCHEMATIC, CONTROLS          203585  16      16 M940    CONT. VENT. NO. 15 &25 FAN-COIL UNITS, SCHEMATIC, CONTROLS          203586  24      24 M940    CONT. VENT. PRESS. VACUUM RELIEF INSIDE ISOL. VALVE,                203587  11      11 SCHEMATIC, CONTROLS M940    CONT. VENT. PRESS. VACUUM RELIEF OUTSIDE ISOL. VALVE,              203588  11      11 SCHEMATIC, CONTROLS M940    CONT. VENT. NO. 11 &21 IODINE REMOVAL UNITS, SCHEMA TIC,            203589  09      09 CONTROLS M940    CONT. VENT. NO. 12 &22 IODINE REMOVAL UNITS, SCHEMATIC,            203590  11      11
* CONTROLS M940    CONT. VENT. NO. 11 &21 CONTROL ROD DRIVE VENT FANS,                203591  09      09 SCHEMATIC, CONTROLS
 
                                                                                  -------~~--~
Page No. 15 11/28/89 SALEM SIMULA TOR Simulator Design Database                          I
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
          ============================================================          ======== ========
M940    CONT. VENT. NO. 12 &22 CONTROL ROD DRIVE VENT FANS,            203592  09      09 SCHEMATIC, CONTROLS M940    CONT. VENT. NO. 13 &23 CONTROL ROD DRIVE VENT FANS,            203593  08      08 SCHEMATIC, CONTROLS M940    CONT. VENT. NO. 14 &24 CONTROL ROD DRIVE VENT FANS,            203594  08      08 SCHEMATIC, CONTROLS M940    CONT. VENT. NO. 11 &21 REACTOR SHIELD VENT FANS, SCHEMATIC,    203595  09      09 CONTROLS M940    CONT. VENT. NO. 12 &22 REACTOR SHIELD VENT FANS, SCHEMATIC,    203596  07      07 CONTROLS M940    CONT. VENT. NO. 11 &21 REAC. NOZ. SUP.T. VENT FANS,            203597  09      09 SCHEMATIC, CONTROLS
* M940    CONT. VENT. NO. 12 &22 REAC. NOZ. SUP'T. VENT FANS,            203598  09      09 SCHEMATIC, CONTROLS M940    CONT. VENT. NO. 13 &23 REAC. NOZ. SUP'T. VENT FANS,            203599  08      08 SCHEMATIC, CONTROLS R120 '  ROD CONTROL SYSTEM, REACTOR TRIP BREAKER 'A' CONTROLS D.C. 203613  07      07 SSC HEMA TIC R120    ROD CONTROL SYSTEM, REACTOR TRIP BREAKER 'B' CONTROLS D.C. 203614  05      05 SCHEMA TIC R120    ROD CONTROL SYSTEM, REACTOR TRIP BYPASS BREAKER 'A" CONTROLS  203615  05      05 D. C. SCHEMA TIC R120    ROD CONTROL SYSTEM, REACTOR TRIP BYPASS BREAKER 'B' CONTROLS  203616  05      05 D.C. SCHEMATIC C900    RAD. MON. SYSTEM NO. 11 &21 CONTAINMENT SAMPLE INLET &        203625  10      10 OUTLET ISOLATION VALVES, SCHEMATIC, CONTROLS R130    SFGDS EMERG. LDG. SEQ.-230V VITAL BUSES lA &2A CONTROL CTR. 203650  07      07 L/O, SCHEMATIC, CONTROLS R130    SFGDS EMERG. LDG. SEQ.-230V VITAL BUSES lB &2B CONTROL CTR. 203651  08      08
* R130 L/O, SCHEMATIC, CONTROLS SFGDS EMERG. LDG. SEQ.-230V VITAL BUSES lC &2C CONTROL CTR.
L/O, SCHEMATIC, CONTROLS 203652  08      08
 
  ~-                                  --~-
I Page No. 16 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
      ------  ============================================================  ------- ======== ========
M940    CONTAINMENT VENT. NO. 11 &21 HYDROGEN RECOMBINERS,            203653  08      08 SCHEMATIC, CONTROLS M940    CONTAINMENT VENT. NO. 12 &22 HYDROGEN RECOMBINERS,            203654  08      08 SCHEMATIC, CONTROLS N600    SAFETY INJECTION SYSTEM ACCUMULATOR VENT CONTROL VALVE,        203655  01      01 SCHEMATIC, CONTROLS G216    S.G. BLOWDOWN SYS. NO. 1GB53 (2GB53) FILTER INLET VA.,        203656  09      09 SCHEMATIC, CONTROLS G216    S.G. BLOWDOWN SYS. NO. 1GB53 (2GB53) FILTER INLET VA.,        203657  07      07 SCHEMATIC, CONTROLS G216    S.G. BLOWDOWN SYS. BLOWDOWN FILTER UNIT, SCHEMATIC, CONTROLS  203658  11      11
* G216    S.G. BLOWDOWN SYS. BLOWDOWN FILTER UNIT, SCHEMATIC, CONTROLS  203659  08      08 R130    SAFEGUARDS, EMERGENCY LOADING SEQUENCE, LOGIC DIAG. SHEET 1,  203666  05      05 CONTROLS R130    SAFEGUARDS, EMERGENCY LOADING SEQUENCE, LOGIC DIAG. SHEET 2,  203667  04      04 CONTROLS R130    SAFEGUARDS, EMERGENCY LOADING SEQUENCE, LOGIC DIAG. SHEET 3,  203668  04      04 CONTROLS R130    SAFEGUARDS, EMERGENCY LOADING SEQUENCE, LOGIC DIAG. SHEET 4,  203669  04      04 CONTROLS R130    SAFEGUARDS, EMERGENCY LOADING SEQUENCE, LOGIC DIAG. SHEET 5,  203670  05      05 CONTROLS R130    SAFEGUARDS, EMERGENCY LOADING SEQUENCE, LOGIC DIAG. SHEET 6,  203673  05      05 CONTROLS N510    WASTE DISPOSAL SYSTEM NO. 1WL108, 2WL108, 1Wl99 &2WL99        203675  05      05 REACTOR COOLANT DRAIN TANK ISOLATION VALVES, SCHEMATIC, CONTROLS N510    WASTE DISPOSAL SYSTEM NO. 1WL17, 2WL17, CONT. SUMP, 1WG41 &    203676  15      15 2WG41 GASEOUS WASTE DISCHARGE ISOLATION VALVES, SCHEMATIC,
* N530 CONTROLS WASTE DISPOSAL SYSTEM NO. 1WL98 &2WL98 RCDT TO VENT HDR.
NO. 1WL12 &2WL12 RCDT TO WHT ISOLATION VALVES, SCHEMATIC, CONTROLS 203678  15      15
__J
 
                                                                                                  --*-- - -- -- -
Page No. 17 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
N530    WASTE DISPOSAL SYS. NO. 1WL51 &2WL51 LIQUID WASTE DISCH.      203679  12      12 VAS. NO. 11, 12, 21 &22 RC DRAIN TANK PUMPS, SCHEMATIC, CONTROLS N500    WASTE DISPOSAL SYSTEM NO. 1WL13 &2WL13 RCDT TO WHT, NO.        203680  10      10 1WL96 &2WL96 RCDT TO GAS ANALYZER ISOLATION VALVES, SCHEMATIC, CONTROLS N500    WASTE DISPOSAL SYSTEM SPENT RESIN STORAGE TANK, CONT. SUMP    203681  12      12 DISCH. ISOLATION &REACTOR COOLANT DRAIN TANK VALVES, SCHEMATIC, CONTROLS N530    WASTE DISPOSAL SYSTEM NO. 1WL97 &2WL97 REAC. COOLANT DR.      203685  06      06 TK. TO GAS ANALYZER ISOLATION VALVES, SCHEMATIC, CONTROLS M200    FIRE PROTECTION FIRE ALARM SYSTEM POWER, SCHEMATIC, CONTROLS  203752  H        14
* M200    FIRE PROTECTION FIRE ALARM SYSTEM ALARMS, SCHEMATIC,          203753  08      08 CONTROLS T800    CIRC. WATER INTAKE NO. llA CIRCULATOR, SCHEMATIC, CONTROLS    203810  20      20 T800    CIRC. WATER INTAKE NO. llA CIRCULATOR, SCHEMATIC, CONTROLS    203811  06      06 T800    CIRC. WATER INTAKE NO. 12A CIRCULATOR, SCHEMATIC, CONTROLS    203812  16      16 T800    CIRC. WATER INTAKE NO. 12A CIRCULATOR, SCHEMATIC, CONTROLS    203813  05      05 T800    CIRC. WATER INTAKE NO. 13A CIRCULATOR, SCHEMATIC, CONTROLS    203814  17      17 T800    CIRC. WATER INTAKE NO. 13A CIRCULATOR, SCHEMATIC, CONTROLS    203815  05      05 T800    CIRC. WATER INTAKE NO. llB CIRCULATOR, SCHEMATIC, CONTROLS    203816  16      16 T800    CIRC. WATER INTAKE NO. llB CIRCULATOR, SCHEMATIC, CONTROLS    203817  05      05 T800    CIRC. WATER INTAKE NO. 12B CIRCULATOR, SCHEMATIC, CONTROLS    203818  17      17 T800    CIRC. WATER INTAKE NO. 12B CIRCULATOR, SCHEMATIC, CONTROLS    203819  05      05 T800    CIRC. WATER INTAKE NO. 13B CIRCULATOR, SCHEMATIC, CONTROLS    203820  17      17 CIRC. WATER INTAKE NO. 13B CIRCULATOR, SCHEMATIC, CONTROLS    203821  06      06
* T800 M600    lA &2A 4160V VITAL BUSES NO. 15 &21 SERV. WTR. PUMPS, D.C. 203828  18      18 SCH. ( 125V ) CONTROLS
 
                      -
Page No. 18 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
M600    1A &2A 4160V VITAL BUSES NO. 15 &21 SERV. WTR. PUMPS, D.C. 203829  11      11 SCH. ( 28V ) CONTROLS M600    1B &2B 4160V VITAL BUSES NO. 13 &23 SERV. WTR. PUMPS, D.C. 203830  15      15 SCH. ( 125V ) CONTROLS M600    lB &2B 4160V VITAL BUSES NO. 13 &23 SERV. WTR. PUMPS, D.C. 203831  10      10 SCH. ( 28V ) CONTROLS M600    1C &2C 4160V VITAL BUSES NO. 11 &25 SERV. WTR. PUMPS, D.C. 203832  15      15 SCH. ( 125V ) CONTROLS M600    1C &2C 4160V VITAL BUSES NO. 11 &25 SERV. WTR. PUMPS, D.C. 203833  1G      10 SCH. ( 28V ) CONTROLS M600    1A &2A 4160V VITAL BUSES NO. 16 &22 SERV. WTR. PUMPS, D.C. 203834  15      15 SCH. ( 125V ) CONTROLS
* M600 M600 lA &2A 4160V VITAL BUSES NO. 16 &22 SERV. WTR. PUMPS, D.C.
SCH. ( 28V ) CONTROLS lC &2C 4160V VITAL BUSES NO. 14 &24 SERV. WTR. PUMPS, D.C.
SCH. ( 125V ) CONTROLS 203835 203836 10 15 10 15 M600    1B &2B 4160V VITAL BUSES NO. 14 &24 SERV. WTR. PUMPS, D.C. 203837  10      10 SCH. ( 28V ) CONTROLS M600    1C &2C 4160V VITAL BUSES NO. 12 &26 SERV. WTR. PUMPS, D.C. 203838  15      15 SCH. ( 125V ) CONTROLS M600    lC &2C 4160V VITAL BUSES NO. 12 &26 SERV. WTR. PUMPS, D.C. 203839  10      10 SCH. ( 28V ) CONTROLS T800    CIRC. WATER INTAKE NO. 11A CIRC. WTR. BY-PASS VALVE,          203851  11      11 SCHEMATIC, ~ONTROLS T800    CIRC. WATER INTAKE NO. 11B CIRC. WTR. BY-PASS VALVE,          203852  10      10 SCHEMATIC, CONTROLS T800    CIRC. WATER INTAKE NO. 12A CIRC. WTR. BY-PASS VALVE,          203853  09      09 SCHEMATIC, CONTROLS T800    CIRC. WATER INTAKE NO. 12B CIRC. WTR. BY-PASS VALVE,          203854          10
* 10 SCHEMATIC, CONTROLS T800    CIRC. WATER INTAKE NO. 13A CIRC. WTR. BY-PASS VALVE,          203855  10      10 SCHEMATIC, CONTROLS
 
                                                  -------            --                            ------------
Page No. 19 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
T800    CIRC. WATER INTAKE NO. 13B CIRC. WTR. BY-PASS VALVE,            203856  11      11 SCHEMATIC, CONTROLS T800    T.G.A. CIRCULATING WATER SYSTEM NO. 11A CIRC. COND. OUTLET      203857  10      10 VALVE, SCHEMATIC, CONTROLS T800    T.G.A. CIRCULATING WATER SYSTEM NO. 11B CIRC. COND. OUTLET      203858  09      09 VALVE, SCHEMATIC, CONTROLS T800    T.G.A. CIRCULATING WATER SYSTEM NO. 12A CIRC. COND. OUTLET      203859  09      09 VALVE, SCHEMATIC, CONTROLS T800    T.G.A. CIRCULATING WATER SYSTEM NO. 12B CIRC. COND. OUTLET      203860  09      09 VALVE, SCHEMATIC, CONTROLS T800    T.G.A. CIRCULATING WATER SYSTEM NO. 13A CIRC. COND. OUTLET      203861  09      09 VALVE, SCHEMATIC, CONTROLS
* T800 T800 T.G.A. CIRCULATING WATER SYSTEM NO. 13B CIRC. COND. OUTLET VALVE, SCHEMATIC, CONTROLS CIRC. WATER SYSTEM NO. 11A CIRCULATOR VACUUM BREAKER &
CONDENSER VAS, D.C. SCHEMATIC, CONTROLS 203862 203871 10 08 10 08 T800    CIRC. WATER SYSTEM, NO. 11B CIRCULATOR VACUUM BREAKER &        203872  07      07 CONDENSER VAS., D.C. SCHEMATIC, CONTROLS T800    CIRC. WATER SYSTEM, NO. 12A CIRCULATOR VACUUM BREAKER &        203873  07      07 CONDENSER VAS., D.C. SCHEMATIC, CONTROLS T800    CIRC. WATER SYSTEM, NO. 12B CIRCULATOR VACUUM BREAKER &        20387~  07      07 CONDENSER VAS., D.C. SCHEMATIC, CONTROLS T800    CIRC. WATER SYSTEM, NO. 13A CIRCULATOR VACUUM BREAKER &        203875  07      07 CONDENSER VAS., D.C. SCHEMATIC, CONTROLS T800    CIRC. WATER SYSTEM, NO. 13B CIRCULATOR VACUUM BREAKER &        203876  08      08 CONDENSER VAS., D.C. SCHEMATIC, CONTROLS W100    CONDENSATE F.W., STEAM GENERATOR INLET &BLOWDOWN HIGH          203877  16      16 CONDUCTIVITY ALARM, SCHEMATIC, CONTROLS STEAM GEN. INLET CHEMICAL ANALYSIS ALARMS, SCHEMATIC,          203878  07      07
* W100 CONTROLS W100    STEAM GEN. INLET CHEMICAL ANALYSIS ALARMS, SCHEMATIC,          203879  08      08 CONTROLS
 
              -------                  -                                        - - - - - - - - - -
Page No. 20 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION      LOAD SYSTEM  TITLE                                                          DRAWING    REVISION    11/01/89
  ------  ============================================================  -------    ========    ========
M600    NO. 2 UNIT SERVICE WATER INTAKE NO. 21 &22 DISCH. HEADER      203891    12          12 PRESS. TRANSMITTER, A.C. SCHEMATIC, CONTROLS E120    13KV BUS SECTION 1-2 BKR, SCHEMATIC, SH.1, CONTROLS            203900    07          07 E120    13KV BUS SECTION 4-5 BKR, SCHEMATIC, SH.1, CONTROLS            203901    06          06 E120    13KV BUS SECTION 2-3 BKR, SCHEMATIC, SH.1, CONTROLS            203902    06          06 E120    13KV BUS SECTION 5-6 BKR, SCHEMATIC, SH.1, CONTROLS            203903    06          06 E120    13KV BUS SECTION 3-4 BKR, SCHEMATIC, SH.1, CONTROLS            203904    06          06 E120    13KV BUS SECTION 1-6 BKR, SCHEMATIC, SH.1, CONTROLS            203905    05          05 E510    500KV BUS SECTION 5-6 BKR lOX, SCHEMATIC, SH.1, CONTROLS      203910    09          09
* E510    500KV BUS SECTION 5-6 BKR lOX, SCHEMATIC, SH.2, CONTROLS      203911    12          12 E510    500KV BUS SECTION 2-6 BKR 11X, SCHEMATIC, SH.1, CONTROLS      203912    06          06 E110    500KV BUS SECTION 2-6 BKR 11X, SCHEMATIC, SH.2, CONTROLS      203913    07          07 E510    500KV BUS SECTION 1-5 BKR 12X, SCHEMATIC, SH.1, CONTROLS      203914    09          09 E510    500KV BUS SECTION 1-5 BKR 12X, SCHEMATIC, SH.2, CONTROLS      203915    16          16 EllO    500KV BUS SECTION 1-8 BKR 20X, SCHEMATIC, SH.1, CONTROLS      203916    09          09 E110    500KV BUS SECTION 1-8 BKR 20X, SCHEMATIC, SH.2, CONTROLS      203917    09          09 E110    500KV BUS SECTION 2-8 BKR 21X, SCHEMATIC, SH.1, CONTROLS      203918    08          08 EllO    500KV BUS SECTION 2-8 BKR 21X, SCHEMATIC, SH.2, CONTROLS      203919    09          09 E510    500KV BUS SECTION 9-10 BKR 30X, SCHEMATIC, SH.1, CONTROLS      203920    08          08 E510    500KV BUS SECTION 9-10 BKR 30X, SCHEMATIC, SH.2, CONTROLS      203921    13          13 E110    500KV BUS SECTION 2-10 BKR 31X, SCHEMATIC, SH.1, CONTROLS      203922    08          08 E110    500KV BUS SECTION 2-10 BKR 31X, SCHEMATIC, SH.2, CONTROLS      203923    09          09
* E510 E510 500KV BUS SECTION 1-9 BKR 32X, SCHEMATIC, SH.1, CONTROLS 500KV SWITCHYARD BUS SECTION 1-9 BKR 32X, SCHEMATIC, SH.2, CONTROLS 203924 203925 04 06 04 06
 
Page No. 21 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
          ============================================================            ======== ========
E580    UNITS, SYCHRONIZING, D.C. SCHEMATIC, CONTROLS                  203930  09      09 E580    UNITS, SYCHRONIZING, A.C. SCHEMATIC, CONTROLS                  203931  16      16 E110    500KV BUS SECTION 5-6 BKR. lOX, SCHEMATIC, SH.3, CONTROLS      203944  09      09 E110    500KV BUS SECTION 9-10 BKR.* 30X, SCHEMATIC, SH.3, CONTROLS    203946  10      10 E520    NO. 1 GENERATOR EXCITATION FIELD BREAKER                        203950  12      12 E520    NO. 1 GENERATOR EXCITATION BASE ADJUSTER                        203951  06      06 E520    NO. 2 GENERATOR EXCITATION, VOLTAGE REGULATOR 28V,              203952  06      06 SCHEMATIC, CONTROLS E520    NO. 1 GENERATOR EXCITATION VOLTAGE REGULATOR - 125V            203953  07      07
* E520    NO. 1  GENERATOR EXCITATION VOLTAGE ADJUSTER                    203954  04      04 E170    NO. 1 &2 RELAY PROTECTION TRIPPING ARRANGEMENT                  203970  11      11 E130    NO. 11 &21 STA. PWR. TRANSF. 13/4KV - POTENTIAL TRANSF., AC    203977  11      11
          &DC SCHEMATIC, CONTROLS E130    NO. 12 &22 STA. PWR. TRANSF. 13/4KV - POTENTIAL TRANSF., AC    203980  12      12
          &DC SCHEMATIC, CONTROLS E120    13KV METERING POTENTIAL TRANSF., A.G. SCHEMATIC, CONTROLS      203981  11      11 E120    13KV SWITCHGEAR NO. 1 GROUND RELAY (REG.) PROT., D.C.          203982  09      09 SCHEMATIC, CONTROLS E120    13KV SWITCHGEAR NO. 1 GROUND RELAY (BK-UP) PROT., D.C.          203983  09      09 SCHEMATIC, CONTROLS E120    13KV SWITCHGEAR D.C. CONTROL BUS-ALARMS, D.C. SCHEMATIC,        203989  04      04 CONTROLS E120    UNITS-NO. 11 &21 STA. PWR. TRAN. 13/4KV COOLING, A.G.          203990  04      04 SCHEMATIC, CONTROLS E170    UNITS-NO. 11 & 21 STA. PWR. TRAN. 13/4KV TAP CHANGING, A.C. 203991  06      06 SCHEMATIC, CONTROLS
* E170    UNITS-NO. 11 &21 STA. PWR. TRAN. 13/4KV ALARMS, D.C.            203992  02      02 SCHEMATIC, CONTROLS
 
Page No. 22 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
E170    UNITS-NO. 11 &21 STA. PWR. TRANSF. 13/4KV INSTRUMENTS &        203994  08      08 METERS, A.C. SCHEMATIC, CONTROLS E170    UNIT-NO. 12 &22 STA. PWR. TRAN. 13/4KV COOLING, A.C.            203995  04      04 SCHEMATIC, CONTROLS El70    UNITS-NO. 12 &22 STA. PWR. TRAN. 13/4KV ALARMS, D.C.            203997  02      02 SCHEMATIC, CONTROLS E170    UNITS-NO. 12 &22 STA. PWR .. TRANSF. 13/4KV INSTRUMENTS &      203999  08      08 METERS, A.C. SCHEMATIC, CONTROLS E110    500KV BUS SECTION 2-6 BREAKER 11X, SCHEMATIC, SHEET 3,          204679  10      10 CONTROLS E110    500KV SWITCHYARD LINE PROTECTION 11X REGULAR RELAY              204681  05      05 PROTECTION, *D.C. SCHEMATIC, ELECTRICAL
* E110 E110 500KV SWITCHYARD LINE POSITION 11X REGULAR RELAY PROTECTION LOGIC, D.C. SCHEMATIC, CONTROL 500KV SWITCHYARD, LINE POSITION 11X REGULAR PROTECTION, AC/DC SCHEMATIC, CONTROLS 204682 204683 03 12 03 12 E110    500KV SWITCHYARD LINE POSITION 11X BACKUP RELAY PROTECTION,    204684  09      09 A.C. SCHEMATIC, CONTROL E110    500KV SWITCHYARD LINE POSITION 11X BACKUP RELAY PROTECTION,    204685  13      13 D.C. SCHEMATIC, CONTROL E110    500KV SWITCHYARD A.C.B. 11X BREAKER FAILURE &GROUND            204686  09      09 PROTECTION, D.C. SCHEMATIC, ELECTRICAL MCOO    NO. 1 COMPRESSED AIR                                            205217  30      30 MCOO    NO. 2 UNIT-TURBINE GENERATOR AREA, CONTROL AIR, P&ID SHEET 1    205300  24      24 OF 3, MECHANICAL MCOO    NO. 2 UNIT-TURBINE GENERATOR AREA, CONTROL AIR, P&ID SHEET 2    205300  32      32 OF 3, MECHANICAL MCOO    NO. 2 UNIT-TURBINE GENERATOR AREA, CONTROL AIR, P&ID SHEET 3    205300  32      32 OF 3, MECHANICAL
* R200    NO. 2 UNIT-REACTOR COOLANT, P&ID SHEET 1 OF 3, MECHANICAL      205301  34      34
 
                                                                      ------
Page No. 23 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
R200    NO. 2 UNIT-REACTOR COOLANT, P&ID SHEET 2 OF 3, MECHANICAL      205301  25      25 R200    NO. 2 UNIT-REACTOR COOLANT, P&ID SHEET 3 OF 3, MECHANICAL      205301  25      25 FOOD    NO. 2 UNIT-STEAM GENERATOR FEED &CONDENSATE, P&ID SHEET 1      205302  32      32 OF 3, MECHANICAL FOOD    NO. 2 UNIT-STEAM GENERATOR FEED &CONDENSATE, P&ID SHEET 2      205302  34      34 OF 3, MECHANICAL FOOD    NO. 2 UNIT-STEAM GENERATOR FEED &CONDENSATE, P&ID SHEET 3      205302  34      34 OF 3, MECHANICAL GODO    NO. 2 UNIT-MAIN, REHEAT &TURBINE BY-PASS STEAM, P&ID SHEET    205303  30      30 1 OF 6, MECHANICAL GOOD    NO. 2 UNIT-MAIN, REHEAT &TURBINE BY-PASS STEAM, P&ID SHEET    205303  30      30
* 2 OF 6, MECHANICAL GODO    NO. 2 UNIT-MAIN, REHEAT &TURBINE BY-PASS STEAM, P&ID SHEET    205303  30      30 3 OF 6, MECHANICAL GOOD    NO. 2 UNIT-MAIN, REHEAT &TURBINE BY-PASS STEAM, P&ID SHEET    205303  30      30 4 OF 6, MECHANICAL GOOD    NO. 2 UNIT-MAIN, REHEAT &TURBINE BY-PASS STEAM, P&ID SHEET    205303  30      30 5 OF 6, MECHANICAL GODO    NO. 2 UNIT-MAIN, REHEAT &TURBINE BY-PASS STEAM, P&ID SHEET    205303  30      30 6 OF 6, MECHANICAL T200    NO. 2 UNIT-TURBINE DRAINS, P&ID SHEET 1 OF 2, MECHANICAL      205304  16      16 T200    NO. 2 UNIT-TURBINE DRAINS, P&ID SHEET 2 OF 2, MECHANICAL      205304  16      16 G100    NO. 2 UNIT-BLEED STEAM &HEATER DRAINS, P&ID SHEET 1 OF 6,      205305  22      22 MECHANICAL G100    NO. 2 UNIT-BLEED STEAM &HEATER DRAINS, P&ID SHEET 2 OF 6,      205305  22      22 MECHANICAL G100    NO. 2 UNIT-BLEED STEAM &HEATER DRAINS, P&ID SHEET 3 OF 6,      205305  22      22 MECHANICAL
* G100    NO. 2 UNIT-BLEED STEAM &HEATER DRAINS, P&ID SHEET 4 OF 6, MECHANICAL 205305  22      22
 
                                                      -~------
Page No. 24 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
G100    NO. 2 UNIT-BLEED STEAM &HEATER DRAINS, P&ID SHEET 5 OF 6,      205305  22      22 MECHANICAL GlOO    NO. 2 UNIT-BLEED STEAM &HEATER DRAINS, P&ID SHEET 6 OF 6,      205305  22      22 MECHANICAL MJOO    NO. 2 UNIT-HEATER VENTS &MISCELLANEOUS DRAINS, P&ID SHEET 1    205306  12      12 OF 3, MECHANICAL MJOO    NO. 2 UNIT-HEATER VENTS &MISCELLANEOUS DRAINS, P&ID SHEET 2    205306  12      12 OF 3, MECHANICAL MJOO    NO. 2 UNIT-HEATER VENTS &MISCELLANEOUS DRAINS, P&ID SHEET 3    205306  12      12 OF 3, MECHANICAL T220    NO. 2 UNIT-TURBINE GLAND SEALING STEAM &LEAK-OFF, PIPING        205307  13      13 DIAGRAM, MECHANICAL
* F320 F320 NO. 2 UNIT-CONDENSER AIR REMOVAL AND PRIMING, P&ID SHEET 1 OF 2, MECHANICAL NO. 2 UNIT-CONDENSER AIR REMOVAL AND PRIMING, P&ID SHEET 2 OF 2, MECHANICAL 205308 205308 27 27 27 27 T800    NO. 2 UNIT-CIRCULATING WATER, P&ID SHEET 1 OF 4, MECHANICAL    205309  28      28 T800    NO. 2 UNIT-CIRCULATING WATER, P&ID SHEET 2 OF 4, MECHANICAL    205309  28      28 T800    NO. 2 UNIT-CIRCULATING WATER, P&ID SHEET 3 OF 4, MECHANICAL    205309  28      28 T800    NO. 2 UNIT-CIRCULATING WATER, P&ID SHEET 4 OF 4, MECHANICAL    205309  28      28 T900    NO. 2 UNIT-TURBINE AUXILIARIES COOLING, P&ID SHEET 1 OF 4,      205310  22      22 MECHANICAL T900    NO. 2 UNIT-TURBINE AUXILIARIES COOLING, P&ID SHEET 2 OF 4,      205310  22      22 MECHANICAL T900    NO. 2 UNIT-TURBINE AUXILIARIES COOLING, P&ID SHEET 3 OF 4,      205310  22      22 MECHANICAL T900    NO. 2 UNIT-TURBINE AUXILIARIES COOLING, P&ID SHEET 4 OF 4,      205310  22      22 MECHANICAL
* F800    NO. 2 UNIT-MISC. CONDENSATE, P&ID, SHEET 1 OF 2, MECHANICAL    205311  23      23
 
                            -------~----~----
Page No. 25 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
F800    NO. 2 UNIT-MISC. CONDENSATE, P&ID, SHEET 2 OF 2, MECHANICAL    205311  23      23 M600    NO. 2 UNIT-SERVICE WATER TURB. AREA, P&ID SHEET 1 OF 1,        205312  19      19 MECHANICAL MBDD    NO. 2 UNIT COMPRESSED AIR, P&ID SH. 1 OF 2, MECHANICAL        205317  13      13 MBOO    NO. 2 UNIT COMPRESSED AIR, P&ID SH. 2 OF 2, MECHANICAL        205317  13      13 T500    NO. 2 UNIT MAIN TURBINE LUBRICATING OIL, P&ID SHEET 3 OF 3,    205318  15      15 MECHANICAL T500    NO. 2 UNIT MAIN TURBINE LUBRICATING OIL, P&ID SHEET 1 OF 3,    205318  15      15 MECHANICAL T500    NO. 2 UNIT MAIN TURBINE LUBRICATING OIL, P&ID SHEET 2 OF 3,    205318  15      15 MECHANICAL
* F7DD F700 NO. 2 UNIT STEAM GEN. FEED PUMP AND FEED PUMP TURBINE LUBE OIL, P&ID SHEET 1 OF 2, MECHANICAL NO. 2 UNIT STEAM GEN. FEED PUMP AND FEED PUMP TURBINE LUBE OIL, P&ID SHEET 2 OF 2, MECHANICAL 205319 205319 08 08 08 08 G216    NO. 2 UNIT STEAM GEN. DRAINS &BLOWDOWN, P&ID SHEET 1 OF 2,    205325  30      30 MECHANICAL G216    NO. 2 UNIT STEAM GEN. DRAINS &BLOWDOWN, P&ID SHEET 2 OF 2,    205325  31      31 MECHANICAL N530    NO. 2 UNIT FLOOR DRAINS CONTAMINATED, P&ID SHEET 1 OF 2,      205326  16      16 MECHANICAL N530    NO. 2 UNIT FLOOR DRAINS CONTAMINATED, P&ID SHEET 2 OF 2,      205326  16      16 MECHANICAL N530    NO. 2 UNIT EQUIPMENT VENTS &DRAINS CONTAMINATED, P&ID SHEET    205327  17      17 1 OF 3, MECHANICAL N530    NO. 2 UNIT EQUIPMENT VENTS &DRAINS CONTAMINATED, P&ID SHEET    205327  17      17 2 OF 3, MECHANICAL N530    NO. 2 UNIT EQUIPMENT VENTS &DRAINS CONTAMINATED, P&ID SHEET    205327  17      17
* NlOD 3 OF 3, MECHANICAL NO. 2 UNIT CHEMICAL &VOLUME CONTROL OPERATION, P&ID SHEET 1 OF 3, MECHANICAL 205328  33      33
 
Page No. 26 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
N100    NO. 2 UNIT CHEMICAL &VOLUME CONTROL OPERATION, P&ID SHEET 2    205328  33      33 OF 3, MECHANICAL N100    NO. 2 UNIT CHEMICAL &VOLUME CONTROL OPERATION, P&ID SHEET 3    205328  33      33 OF 3, MECHANICAL N120    NO. 2 UNIT CHEMICAL &VOLUME CONTROL BORIC ACID RECOVERY,        205329  19      19 P&ID SHEET 1 OF 3, MECHANICAL N120    NO. 2 UNIT CHEMICAL &VOLUME CONTROL BORIC ACID RECOVERY,        205329  19      19 P&ID SHEET 2 OF 3, MECHANICAL N120    NO. 2 UNIT CHEMICAL &VOLUME CONTROL BORIC ACID RECOVERY,        205329  18      18 P&ID SHEET 3 OF 3, MECHANICAL N130    NO. 2 UNIT CHEMICAL &VOLUME CONTROL PRIMARY WATER RECOVERY,    205330  14      14 P&ID SHEET 1 OF 1, MECHANICAL
* N210 N210 N210 NO. 2 UNIT COMPONENT COOLING, P&ID SHEET 1 OF 3, MECHANICAL NO. 2 UNIT COMPONENT COOLING, P&ID SHEET 2 OF 3, MECHANICAL NO. 2 UNIT COMPONENT COOLING, P&ID SHEET 3 OF 3, MECHANICAL 205331 205331 205331 30      30 N220    NO. 2 UNIT RESIDUAL HEAT REMOVAL, P&ID SHEET 1 OF 2,            205332  15      15 MECHANICAL N220    NO. 2 UNIT RESIDUAL HEAT REMOVAL, P&ID SHEET 2 OF 2,            205332  14      14 MECHANICAL N600    NO. 2 UNIT SAFETY INJECTION, P&ID SHEET 1 OF 4, MECHANICAL      205334  38      38 N600    NO. 2 UNIT SAFETY INJECTION, P&ID SHEET 2 OF 4, MECHANICAL      205334  38      38 N600    NO. 2 UNIT SAFETY INJECTION, P&ID SHEET 3 OF 4, MECHANICAL      205334  39      39 N600    NO. 2 UNIT SAFETY INJECTION, P&ID SHEET 4 OF 4, MECHANICAL      205334  38      38 N620    NO. 2 UNIT CONTAINMENT SPRAY, P&ID SHEET 1 OF 1, MECHANICAL    205335  20      20 F400    NO. 2 UNIT AUXILIARY FEEDWATER, P&ID SHEET 1 OF 1,              205336  21      21 MECHANICAL
* M910    NO. 2 UNIT AUXILIARY BUILDING, VENTILIATION, P&ID SHEET 1 OF 3, MECHANICAL 205337  15      15
 
-~---
                                                                                  -
Page No. 27 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
      ------  ============================================================    ------- ======== ========
M910    NO. 2 UNIT AUXILIARY BUILDING, VENTILIATION, P&ID SHEET 2 OF    205337  15      15 3, MECHANICAL M910    NO. 2 UNIT AUXILIARY BUILDING, VENTILIATION, P&ID SHEET 3 OF    205337  15      15 3, MECHANICAL M940    NO. 2 UNIT REACTOR CONTAINMENT, VENTILIATION, P&ID SHEET 1      205338  17      17 OF 3, MECHANICAL M940    NO. 2 UNIT REACTOR CONTAINMENT, VENTILIATION, P&ID SHEET 2      205338  17      17 OF 3, MECHANICAL M940    NO. 2 UNIT REACTOR CONTAINMENT, VENTILIATION, P&ID SHEET 3      205338  17      17 OF 3, MECHANICAL N530    NO. 2 UNIT WASTE DISPOSAL LIQUID, P&ID SHEET 1 OF 3,            205339  20      20 MECHANICAL
* N530 N530 NO. 2 UNIT WASTE DISPOSAL LIQUID, P&ID SHEET 2 OF 3, MECHANICAL NO. 2 UNIT WASTE DISPOSAL LIQUID, P&ID SHEET 3 OF 3, MECHANICAL 205339 205339 20 21 20 21 N510    NO. 2 UNIT WASTE DISPOSAL GAS, P&ID SHEET 1 OF 3, MECHANICAL    205340  18      18 N510    NO. 2 UNIT WASTE DISPOSAL GAS, P&ID SHEET 2 OF 3, MECHANICAL    205340  18      18 N510    NO. 2 UNIT WASTE DISPOSAL GAS, P&ID SHEET 3 OF 3, MECHANICAL    205340  18      18 M600    NO. 2 UNIT SERVICE WATER NUCLEAR AREA, P&ID SHEET 1 OF 6,      205342  35      35 MECHANICAL
      ~1600    NO. 2 UNIT SERVICE WATER NUCLEAR AREA, P&ID SHEET 2 OF 6,      205342  35      35 MECHANICAL M600    NO. 2 UNIT SERVICE WATER NUCLEAR AREA, P&ID SHEET 3 OF 6,      205342  34      34 MECHANICAL M600    NO. 2 UNIT SERVICE WATER NUCLEAR AREA, P&ID SHEET 4 OF 6,      205342  35      35 MECHANICAL M600    NO. 2 UNIT SERVICE WATER NUCLEAR AREA, P&ID SHEET 5 OF 6,      205342  34      34
* M600 MECHANICAL NO. 2 UNIT SERVICE WATER NUCLEAR AREA, P&ID SHEET 6 OF 6, MECHANICAL 205342  35      35
 
                                                                ---                -                - --------
Page No. 28 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING  REVISION 11/01/89
  ------  ============================================================    -------  ======== ========
MCOO      NO. 2 UNIT AUXILIARY BUILDING CONTROL AIR, P&ID SHEET 1 OF    205343    26      26 2, MECHANICAL MCOO    NO. 2 UNIT AUXILIARY BUILDING CONTROL AIR, P&ID SHEET 2 OF      205343    26      26 2, MECHANICAL N400    NO. 2 UNIT SAMPLING, P&ID SHEET 1 OF 3, CONTROLS                205344    20      20 N400    NO. 2 SAMPLING SHEET 1 OF 3                                    205344    20      20 N400    NO. 2 UNIT SAMPLING, P&ID SHEET 2 OF 3, CONTROLS                205344    20      20 G220    NO. 2 UNIT MOISTURE SEPERATOR REHEATERS STEAM &DRAINS, P&ID    205345    18      18 SHEET 1 OF 3, MECHANICAL G220    NO. 2 UNIT MOISTURE SEPERATOR REHEATERS STEAM &DRAINS, P&ID    205345    19      19 SHEET 2 OF 3, MECHANICAL
* G220 MCOO NO. 2 UNIT MOISTURE SEPERATOR REHEATERS STEAM &DRAINS, P&ID SHEET 3 OF 3, MECHANICAL NO. 2 UNIT REACTOR CONTAINMENT &PENETRATION AREA - CONTROL AIR, P&ID SHEET 1 OF 3, MECHANICAL 205345 205347 19 24 19 24 MCOO    NO. 2 UNIT REACTOR CONTAINMENT &PENETRATION AREA - CONTROL      205347    24      24 AIR, P&ID SHEET 2 OF 3, MECHANICAL MCOO    NO. 2 UNIT REACTOR CONTAINMENT &PENETRATION AREA - CONTROL      205347    24      24 AIR, P&ID SHEET 3 OF 3, MECHANICAL M921    NO. 2 UNIT AUX. BLDG. CONTROL AREA AIR CONDITIONING AND        205348    18      18 VENTILATION, P&ID SHEET 1 OF 2, MECHANICAL M921    NO. 2 UNIT AUX. BLDG. CONTROL AREA AIR CONDITIONING AND        205348    18      18 VENTILATION, P&ID SHEET 2 OF 2, MECHANICAL E155    NO 1 CIRC WTR INTAKE 230V CONTROL CENTER SECT NO 2 ONE LINE    207944    15      15 DIAGRAM MK.NO.I-1125, ELECTRICAL E150    NO 2 CIRC WTR INTAKE 230V CONTROL CENTER SECT NO 1 ONE LINE    207945    16      16 DETAILS MK. NO. I-2125, ELECTRICAL E150    NO 1&2 UNITS, NO. 2 CIRC WTR INTAKE 230 CONTROL ENTER SECT      207946    12      12
* EllD NO. 2 ONE LINE, DETAILS MK. NO. I-2125, ELECTRICAL SDOKV SWITCHYARD, ONE LINE CONTROL, DIAGRAM, ELECTRICAL        208625    13      13
 
              -----------                        ---------------
Page No. 29 11/28/89 SALEM SIMULATOR Simulator Design Database
* SYSTEM
  ------
TITLE Sorted by Drawing Number
          ============================================================
DRAWING
                                                                          -------
STATION REVISION
                                                                                  ========
TRAINING LOAD 11/01/89
                                                                                            ========
E110    500KV SWITCHYARD, INSTRUMENT &RELAY POTENTIAL, ONE LINE        208626  06      06 DIAGRAM, ELECTRICAL E110    500KV SWITCHYARD, BUS SECTION 1-8 BREAKER 20X, SCHEMATIC,      208632  15      15 SHEET 3, CONTROLS E110    500KV SWITCHYARD BUS SECTION 2-8 BREAKER 21X, SCHEMATIC,        208634  13      13 SHEET 3, CONTROLS E110    500KV BUS SECTION 2-10 BREAKER 31X, SCHEMATIC, SHEET 3,        208636  13      13 CONTROLS E170    500KV SWYD. NO. 1 STA. PWR. TRANSF DIFF. RELAY PROTECTION,      208675  06      06 A.C. SCH., ELECTRICAL E170    500KV SWYD. NO. 1 STA. *PWR. TRANSF DIFF. RELAY PROTECTION,    208676  08      08 D.C. SCH., ELECTRICAL
* EllO E110 500KV SWYD. LINE POSITION 21X REG. RELAY PROTECTION, A.C.
SCHEMATIC, CONTROLS 500KV SWICHYARD, LINE POSITION 21X, REGULAR RELAY PROTECTION, LOGIC, CONTROLS 208677 208678 14 09 14 09 E110    500KV SWYD. LINE POSITION 21X BACK-UP RELAY PROTECTION, A.C. 208680  14      14 SCHEMATIC, CONTROLS E110    500KV SWYD. LINE POSITION 21X BACK-UP RELAY PROTECTION, D.C. 208681  19      19 SCHEMATIC, CONTROLS EllO    500KV SWYD. LINE POSITION 31X REGULAR PILOT WIRE RELAY          208684  16      16 PROTECTION, A.C. SCHEMATIC, ELEC. SYS. CONTROLS EllO    500KV SWYD. LINE POSITION 31X REGULAR PILOT WIRE RELAY          208686  15      15 PROTECTION, D.C. SCHEMATIC, ELEC. SYS. CONTROLS E110    500KV SWYD. LINE POSITION 31X BACK-UP PILOT WIRE RELAY          208687  12      12 PROTECTION, A.C. SCHEMATIC, ELEC. SYS. CONTROLS E110    500KV SWYD. LINE POSITION 31X BACK-UP PILOT WIRE RELAY          208688  16      16 PROTECTION, D.C. SCHEMATIC, ELEC. SYS. CONTROLS
* E170    500KV SWITCHYARD, NO. 2 STA. PWR TRANSF. DIFF. RELAY            208695  07      07 PROTECTION, AC SCHEMATIC, ELECTRICAL E170    500KV SWITCHYARD, NO. 2 STA. PWR TRANSF. DIFF. RELAY            208696  10      10 PROTECTION, DC SCHEMATIC, ELECTRICAL
 
                                                                                  -------------------
Page No. 30 11/28/89 SALEM SIMULATOR Simulator Design Database
* SYSTEM
  ------
TITLE Sorted by Drawing Number
          ============================================================
DRAWING
                                                                          -------
STATION REVISION
                                                                                  ========
TRAINING LOAD 11/01/89
                                                                                            ========
E110    5DDKV SWITCHYARD, CIRCUIT SWITCHER 2T60, D.C. SCHEMATIC,        208708  02      02 28V., ELECTRICAL E110    500KV SWITCHYARD, CIRCUIT SWITCHER 2T60, D. C. SCHEMATIC,      208709  07      07 125V., ELECTRICAL E17D    500KV SWITCHYARD, NO. 1 &2 STATION POWER TRANS ALARMS,          208713  05      05 SCHEMATIC, ELECTRICAL E110    500KV BUS SECTION 1-8 BKR. 20X, SCHEMATIC, SHEET 3, CONTROLS    209632  12      12 E120    13KV BUS SECTION 1-2 BKR., SCHEMATIC, SHEET 2, CONTROLS        211005  10      10 E120    13KV BUS SECTION 4-5 BKR., SCHEMATIC, SHEET 2, CONTROLS        211006  13      13 E120    13KV BUS SECTION 2-3 BKR., SCHEMATIC, SHEET 2, CONTROLS        211007  11      11
* E120    13KV BUS SECTION 5-6 BKR., SCHEMATIC, SHEET 2, CONTROLS        211008  10      10 E120    13KV BUS SECTION 3-4 BKR., SCHEMATIC, SHEET 2, CONTROLS        211009  16      16 E120    13KV BUS SECTION 1-6 BKR., SCHEMATIC, SHEET 2, CONTROLS        211010  10      10 E160    UNITS-AUX. PWR. TRANS. 25/4KV. COOLING, A.C. SCHEMATIC,        211020  05      05 CONTROLS E160    NO. 1 &2 UNITS AUX. PWR. TRANS. 25/4KV. TAP CHANGING-WIND      211021  06      06 ING 'A', A.C. SCHEMATIC, CONTROLS E160    NO. 1 &2 UNITS AUXILIARY PWR. TRANS. 25/4KV. TAP                211022  06      06 CHANGING-WINDING 'B', A.C. SCHEMATIC, CONTROLS E160    UNITS-AUX. PWR. TRANS. 25/4KV. ALARMS, D.C. SCHEMATIC,          211023  03      03 CONTROLS E180    GENERATOR-MAIN TRANSFS. ALARMS, D.C. SCHEMATIC, CONTROLS        211027  07      07 E17D    NO. 11 &21 STA. PWR. TRANSF. 13/14KV TAP CHANGING, D.C.        211038  07      07 SCHEMATIC, 28V, CONTROLS E170    NO. 12 &22 STA. PWR. TRANSF. 13/14KV TAP CHANGING, D.C.        211039  07      07 SCHEMATIC, 28V, CONTROLS
* E160 E160 NO. 1 &2 AUX PWR. TRANS 25/4KV TAP CHANGING - WINDING 'A' NO. 1 &2 AUX. PWR TRANS 25/4KV TAP CHANGING - WINDING 'B' 211040 211041 07 07 07 07
 
                                                                                                    --- -- ----
Page No. 31 11/28/89 SALEM SIMULATOR Simulator Design Database
* SYSTEM
  ------
TITLE Sorted by Drawing Number
          ============================================================
DRAWING
                                                                          -------
STATION REVISION
                                                                                  ========
TRAINING LOAD 11/01/89
                                                                                            ========
E120    13KV SWITCHGEAR, NO. 2 GRD. REL. (REG) PROTECTION, D. C.        211042  11      11 SCHEMATIC, CONTROLS E120    13KV SWITCHGEAR, NO. 2 GRD. REL. (BK-UP) PROTECTION, D.C.      211043  10      10 SCHEMATIC, CONTROLS E160    NO. 2 UNIT-NO. 2 AUX. PWR. TRANS. 25/4KV RELAY PROTECTION,      211044  02      02 A.C. SCHEMATIC, CONTROLS E160    NO. 2 UNIT-NO. 2 AUX. PWR. TRANS. 25/4KV RELAY PROTECTION,      211045  03      03 D.C. SCHEMATIC, CONTROLS E560    NO. 1 GENERATOR &MAIN TRANSFORMER OVERALL DIFF. REG. AND        211052  09      09 NO. 1 GENERATOR MAIN TRANSFORMER COOLING REL PK. 1R1 E560    NO. 1 GENERATOR &NO. 1 AUXILIARY POWER TRANSFORMER DIFF.        211054  12      12 REG. RELAY PACK 1R2
* MCOO E230 E220 STATION AIR COMPRESSORS AND CONTROL AIR DRYERS 250V STOR. BATTERY INSTRUMENT &ALARM CURCUITS, DC-AC SCHEMATIC, CONTROLS NO. lB &2B-125 VOLT STORAGE BATTERY INSTRUMENT &ALARM 211319 211352 211354 11 09 10 11 09 10 CIRCUITS, D.C.-A.C. SCHEMATIC, CONTROLS E110    1A &2A 28 VOLT BATTERY INSTRUMENT &ALARM CIRCUITS              211355  10      10 EllO    lB &2B 28 VOLT BATTERY INSTRUMENT &ALARM CIRCUITS              211356  10      10 E210    28V D.C. ONE LINE, ONE LINE DIAGRAM, ELECTRICAL                211357  04      04 E153    NO. 2 UNIT, 115V CONTROLS SYSTEM, ONE LINE SH. 2, CONTROLS      211370  22      22 N220    RESIDUAL HEAT REMOVAL SYS. NO. 11 &21 RESIDUAL HEAT REMOVAL    211500  05      05 PUMPS, D.C. SCHEMATIC, CONTROLS N220    RESIDUAL HEAT REMOVAL SYS. NO. 11 &21 RESIDUAL HEAT REMOVAL    211501  09      09 PUMPS, D.C. SCHEMATIC, CONTROLS N220    RESIDUAL HEAT REMOVAL SYS. NO. 12 &22 RESIDUAL HEAT REMOVAL    211502  06      06 PUMPS, D.C. SCHEMATIC, CONTROLS
* N220    RESIDUAL HEAT REMOVAL SYS. NO. 12 &22 RESIDUAL HEAT REMOVAL PUMPS, D.C. SCHEMATIC, CONTROLS 211503  09      09
 
          ---
Page No. 32 11/28/89 SALEM SIMULATOR Simulator Design Database
* SYSTEM
  ------
TITLE Sorted by Drawing Number
            ============================================================
DRAWING
                                                                          -------
STATION REVISION
                                                                                  ========
TRAINING LOAD 11/01/89
                                                                                            ========
N220      RESIDUAL HEAT REMOVAL SYS. NO. 11SJ44, 21SJ44, 11RH4, 21RH4,  211504  08      08 1RH2 &2RH2, SUCTION ISOLATION VALVES, SCHEMATIC, CONTROLS N220      RESIDUAL HEAT REMOVAL SYS. NO. 11SJ44, 21SJ44, 11RH4, 21RH4,  211505  20      20 1RH2 &2RH2, SUCTION ISOLATION VALVES, SCHEMATIC, CONTROLS N220      RESIDUAL HEAT REMOVAL SYS. NO. 12SJ44, 22SJ44, 12RH4, 22RH4,  211506  06      06 1RH1 &2RH1, SUCTION ISOLATION VALVES, SCHEMATIC, CONTROLS N220      R.H.R SYSTEM, NO. 12SJ44, 22SJ44, 12RH4, 22RH4, 1RH1 &2RH1    211507  20      20 SUCTION ISOL. VALVES, SCHEMATIC, CONTROLS N220      R.H.R SYSTEM, NO. 1SJ69, 2SJ69 RWST TO RHRP'S SUCTION VALVES  211508  13      13
            & NO. 1RH20, 2RH20 RHX BYPASS CONTROL VALVES, SCHEMATIC, CONTROLS N220      R.H.R SYSTEM, NO. 11SJ49, 21SJ49, 11RH19, 21RH19, 11RH18 &    211509  08      08
* 21RH18 COOLDOWN CONTROL VALVES, SCHEMATIC, CONTROLS N220      R.H.R SYSTEM, NO. 11SJ49, 21SJ49, 11RH19, 21RH19, 11RH18  &    211510  12      12 21RH18 COOLDOWN CONTROL VALVES, SCHEMATIC, CONTROLS N220      R.H.R SYSTEM, NO. 12SJ49, 22SJ49, 12RH18, 22RH18, 12RH19  &    211511  08      08 22RH19 COOLDOWN CONTROL VALVES, SCHEMATIC, CONTROLS N220      R.H.R SYSTEM, NO. 12SH9, 22SJ49, 12RH18, 22RH18, 12RH19  &    211512  12      12 22RH19 COOLDOWN CONTROL VALVES, SCHEMATIC, CONTROLS N220      R.H.R SYSTEM, CONTAINMENT SUMP LEVEL LT-938, SCHEMATIC,        211513  08      08 CONTROLS N220      R.H.R SYSTEM, CONTAINMENT SUMP LEVEL LT-939, SCHEMATIC,        211514  07      07 CONTROLS N220      R.H.R SYSTEM, NO. 1RH26 &2RH26 HOT-LEG ISOLATION VALVES,      211515  11      11 SCHEMATIC, CONTROLS N210      COMPONENT COOLING SYSTEM, NO. 11 &21 COMPONENT COOLING        211516  04      04 PUMPS, D.C. SCHEMATIC, CONTROLS N210      COMPONENT COOLING SYSTEM, NO. 11 &21 COMPONENT COOLING        211517  08      08 PUMPS, D.C. SCHEMATIC, CONTROLS
* N210      COMPONENT COOLING SYSTEM, NO. 12 &22 COMPONENT COOLING PUMPS, D.C. SCHEMATIC, CONTROLS 211518  04      04
 
Page No. 33 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
          ============================================================          ======== ========
N210    COMPONENT COOLING SYSTEM, NO. 12 &22 COMPONENT COOLING        211519  08      08 PUMPS, D.C. SCHEMATIC, CONTROLS N210    COMPONENT COOLING SYSTEM, NO. 13 &23 COMPONENT COOLING        211520  04      04 PUMPS, D.C. SCHEMATIC, CONTROLS N210    COMPONENT COOLING SYSTEM, NO. 13 &23 COMPONENT COOLING        211521  06      06 PUMPS, D.C. SCHEMATIC, CONTROLS N210    COMPONENT COOLING SYSTEM SURGE TANK, NO. 11&21 COMPONENT      211522  11      11 COOLING HEADER PRESS. ALARMS, SCHEMATIC, CONTROLS N210    COMPONENT COOLING SYSTEM SURGE TANK, NO. 12&22 COMPONENT      211523  10      10 COOLING HEADER PRESS. ALARMS, SCHEMATIC, CONTROLS N210    COMPONENT COOLING SYS. NO. 1CC149 &2CC149 SURGE TANK VENT      211524  10      10 VALVES, SCHEMATIC, CONTROLS
* N210    COMPONENT COOLING SYS. NO. 1CC131 &2CC131 THERM. BARRIER CW    211525  08      08 FLOW CONTROL VALVES, SCHEMATIC, CONTROLS N210    COMPONENT COOLING SYS. NO. 1CC117, 2CC117, 1CC136 &2CC136      211526  04      04 RCP CCW INLET &OUTLET ISOL. VA'S., SCHEMATIC, CONTROLS N210    COMPONENT COOLING SYS. NO. 1CC117, 2CC117, 1CC136 &2CC136      211527  11      11 RCP CCW INLET &OUTLET ISOL. VA'S., SCHEMATIC, CONTROLS N210    COMPONENT COOLING SYS. NO. 1CC118 RCP'S CCW INLET &NO.        211528  19      19 1CC113 &2CC113 ELHX CW OUTLET ISOLATION VALVES, SCHEMATIC, SHEET 1, CONTROLS N210    COMPONENT COOLING SYS. NO. 11 &21 RHX CW DISCH. !SOL.          211529  09      09 VALVES NO. 11CC16 &21CC16, SCHEMATIC, CONTROLS N210    COMPONENT COOLING SYS. NO. 12 &22 RHX CW DISCH. !SOL.          211530  08      08 VALVES NO. 12CC16 &22CC16, SCHEMATIC, CONTROLS R200    REAC. COOLANT SYS. NO. 11 &21 REACTOR COOLANT PUMPS &OIL      211531  05      05 LIFT PUMPS, SCHEMATIC, CONTROLS R200    REAC. COOLANT SYS. NO. 11 &21 REACTOR COOLANT PUMPS,          211532  15      15 SCHEMATIC, CONTROLS
* R200    REAC. COOLANT SYS. NO. 12 &22 REACTOR COOLANT PUMPS &OIL      211533  06      06 LIFT PUMPS, SCHEMATIC, CONTROLS
 
                                                                        ---~
Page No. 34 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  -------  ======== ========
R200    REAC. COOLANT SYS. NO. 12 &22 REACTOR COOLANT PUMPS,            211534  14      14 SCHEMATIC, CONTROLS R200    REAC. COOLANT SYS. NO. 13 &23 REACTOR COOLANT PUMPS &OIL      211535  06      06 LIFT PUMPS, SCHEMATIC, CONTROLS R200    REAC. COOLANT SYS. NO. 13 &23 REACTOR COOLANT PUMPS,          211536  14      a SCHEMATIC, CONTROLS R200    REAC. COOLANT SYS. NO. 14 &24 REACTOR COOLANT PUMPS &OIL      211537  06      06 LIFT PUMPS, SCHEMATIC, CONTROLS R200    REAC. COOLANT SYS. NO. 14 &24 REACTOR COOLANT PUMPS,            211538  14      14 SCHEMATIC, CONTROLS R200    REAC. COOLANT SYS. NO. 11 &21 REACTOR COOLANT PUMPS-ALARMS,    211539  11      11 SCHEMATIC SHEET 1, CONTROLS
* R200 R200 REAC. COOLANT SYS. NO. 11 &21 REACTOR COOLANT PUMPS-ALARMS, SCHEMATIC SHEET 2, CONTROLS REAC. COOLANT SYS. NO. 11 &21 REACTOR COOLANT PUMPS-ALARMS, SCHEMATIC SHEET 3, CONTROLS 211540 211541 08 08 08 08 R200    REAC. COOLANT SYS. NO. 12 &22 REACTOR COOLANT PUMPS-ALARMS,    211542  11      11 SCHEMATIC SHEET 1, CONTROLS R200    REAC. COOLANT SYS. NO. 12 &22 REACTOR COOLANT PUMPS-ALARMS,    211543  08      08 SCHEMATIC SHEET 2, CONTROLS R200    REAC. COOLANT SYS. NO. 12 &22 REACTOR COOLANT PUMPS-ALARMS      211544  08      08
          &RV FLANGE LEAK-OFF VAS. 1RC4 &2RC4, SCHEMATIC SHEET 3, CONTROLS R200    REAC. COOLANT SYS. NO. 13 &23 R.C. PUMPS-ALARMS, SCHEMATIC    211545  11      11 SHEET 1, CONTROLS R200    REAC. COOLANT SYS. NO. 13 &23 R.C. PUMPS-ALARMS, SCHEMATIC    211546  08      08 SHEET 2, CONTROLS R200    REAC. COOLANT SYS. NO. 13 &23 R.C. PUMPS-ALARMS, SCHEMATIC      211547  08      08 SHEET 3, CONTROLS
* R200    REAC. COOLANT SYS. NO. 14 &24 R.C. PUMPS-ALARMS, SCHEMATIC SHEET 1, CONTROLS 211548  12      12
 
                                                                                  -------------------
Page No. 35 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
R200*    REAC. COOLANT SYS. NO. 14 &24 R.C. PUMPS-ALARMS, SCHEMATIC    211549  08      08 SHEET 2, CONTROLS R200    REAC. COOLANT SYS. NO. 14 &24 R.C. PUMPS-ALARMS, SCHEMATIC    211550  07      07 SHEET 3, CONTROLS R200    REAC. COOLANT SYS. NO. 11WR62 &21WR62 STANDPIPE SUP. VAS.      211551  07      07 NO. 11CV104 &21CV104 SEAL LEAK-OFF VALVES, SCHEMATIC, CONTROLS R200    REAC. COOLANT SYS. NO. 12WR62 &22WR62 STANDPIPE SUP. VAS.      211552  07      07 NO. 12CV104 &22CV104 SEAL LEAK-OFF VALVES, SCHEMATIC, CONTROLS R200    REAC. COOLANT SYS. NO. 13WR62 &23WR62 STANDPIPE SUP. VAS.      211553  07      07 NO. 13CV104 &23CV104 SEAL LEAK-OFF VALVES, SCHEMATIC, CONTROLS
* R200 N220 REAC. COOLANT SYS. NO. 14WR62 &24WR62 STANDPIPE SUP. VAS.
NO. 14CV104 &24CV104 SEAL LEAK-OFF VALVES, SCHEMATIC, CONTROLS R.H.R SYSTEM NO. 11RH29 SCHEMATIC, CONTROLS
                                  & 21RH29 RHRP'S BYPASS VALVES, 211554 211555 06 10 06 10 N220    R.H.R SYSTEM NO. 12RH29 &22RH29 RHRP'S BYPASS VALVES,          211556  10      10 SCHEMATIC, CONTROLS NlOO    eves NO. 1CV140, 2CV140, 1CV69 &2CV69 CHG. DISCH. &NO.        211563  02      02 1CV79 &2CV79 RCS CHG. ISOL. VA'S., SCHEMATIC, SHEET 1, CONTROLS NlOO    eves NO. 1CV140, 2CV140, 1CV69 &2CV69 CHG. 'DISCH. & NO.      211564  12      12 1CV79 & 2CV79 RCS CHG. ISOL. VA'S., SCHEMATIC, SHEET 2, CONTROLS NlOO    eves NO. 1CV139 &2CV139 DISCH. TO SWHX &NO. 1CV68 &2CV68      211565  02      02 DISCH. TO RHX ISOL. VA'S, SCHEMATIC, SHEET 1, CONTROLS NlOO    eves NO. 1CV139 &2CV139 DISCH. TO SWHX &NO. 1CV68 &2CV68      211566  10      10 DISCH. TO RHX ISOL. VA'S, SCHEMATIC, SHEET 2, CONTROLS eves NO. 1CV3 &2CV3 LTDWN. ORIFICE ISOL. VAS. NO. 1CV7 &      211572  02      02
* NlOO 2CV7 LTDWN. CONT. ISOL. YAS., SCHEMATIC, SHEET 1, CONTROLS NlOO    eves NO. 1CV3 &2CV3 LTDWN. ORIFICE ISOL. VAS. NO. 1CV7 &      211573  07      07 2CV7 LTDWN. CONT. ISOL. VAS., SCHEMATIC, SHEET 2, CONTROLS
 
Page No. 36 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
          ============================================================          ======== ========
N100    eves NO. 1CV4 &2CV4 LTDWN. ORIFICE ISOL. VAS.' SCHEMATIC,      211574  07      07 CONTROLS N100    eves NO. 1CV5 &2CV5 LTDWN. ORIFICE ISOL. VAS., SCHEMATIC,      211575  06      06 CONTROLS N100    eves NO. 1CV134 &2CV134 EXC. LETDOWN FLOW DIV. VAS. NO.        211576  06      06 1CV131, 2CV131, 1CV132 & 2CV132 ELHX VALVES, SCHEMATIC, CONTROLS N100    eves NO. 1SJ1 &2SJ1 CHG. PMP. SUCT. FROM RWST &NO. 1CV116      211577  02      02
          &2CV116 SEAL WTR. TO VCT !SOL. VA, SCHEMATIC, SHEET 1, CONTROLS NlOO    eves NO. 1SJ1 &2SJ1 CHG. PMP. SUCT. FROM RWST &NO. 1CV116      211578  09      09
          &2CV116 SEAL WTR. TO VCT ISOL. VA, SCHEMATIC, SHEET 2, CONTROLS
* N100    eves NO. 1SJ2 &2SJ2 CHG. PMP. SUCT. FROM RWST &NO. 1CV284      211579  02      02
          &2CV284 SEAL WTR. TO VCT ISOL. VA, SCHEMATIC, SHEET 1, CONTROLS N100    eves NO. 1SJ2 &2SJ2 CHG. PMP. SUCT. FROM RWST &NO. 1CV284      211580  11      11
          &2CV284 SEAL WTR. TO VCT ISOL. VA, SCHEMATIC, SHEET 2, CONTROLS N100    eves NO. 1CV40 &2CV40 VOLUME CONTROL TANK FIRST DISCHARGE      211581  02      02 STOP VALVES, SCHEMATIC SHEET 1, CONTROLS N100    eves NO. 1CV40 &2CV40 VOLUME CONTROL TANK FIRST DISCHARGE      211582  08      08 STOP VALVES, SCHEMATIC SHEET 2, CONTROLS N100    eves NO. 1CV41 &2CV41 VOLUME CONTROL TANK SECOND DISCHARGE    211583  10      10 STOP VALVES, SCHEMATIC, CONTROLS N100    eves NO. 1CV35 &2CV35 VOLUME CONTROL TANK LEVEL CONTROL        211584  04      04 VALVES, SCHEMATIC, SHEET 1, CONTROLS NlOO    eves NO. 1CV35 &2CV35 VOLUME CONTROL TANK LEVEL CONTROL        211585  03      03 VALVES, SCHEMATIC, SHEET 2, CONTROLS NlOO    eves NO. 1CV2 &2CV2 RCS LETDOWN LINE ISOL. VALVES,            211586  06      06 SCHEMATIC, CONTROLS
* N100    eves NO. 1CV277 &2CV277 RCS LETDOWN ISOL. VALVES,              211587  06      06 SCHEMATIC, CONTROLS
 
                                                                    -            -----------------
Page No. 37 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
NlOO    eves NO. 1CV278 &2CV278 EXCESS LETDOWN HEAT EXCHANGER INLET    211588  02      02 VALVES, SCHEMATIC, CONTROLS NlDO    eves NO. 1CV21 &2CV21 TEMP. CONT. FLOW VAS. TO DM &NO.          211593  04      04 1CV27 &2CV27 DM DIVERTING VAS., SCHEMATIC, SHEET 1, CONTROLS NlOO    eves NO. 1CV21 &2CV21 TEMP. CONT. FLOW VAS. TO DM &NO.          211594  05      05 1CV27 &2CV27 DM DIVERTING VAS., SCHEMATIC, SHEET 2, CONTROLS NlOO    eves MAKE-UP MODE SELECTION, SCHEMATIC, SHEET 1, CONTROLS      211595  07      07 NlOO    eves MAKE-UP MODE SELECTION, SCHEMATIC, SHEET 2, CONTROLS      211596  05      05 N100    eves BA. &PRI. WTR. FLOW DEV. ALARMS, SCHEMATIC, CONTROLS      211597  04      04
* N100    eves NO. 1CV185 & 2CV185 CHG. SUCT. MU  & NO. 1CV181 & 2CV181  211598  05      05 VCT MU STOP VAS., SCHEMATIC, CONTROLS NlOO    eves NO. 1cv1s5 2CV185, 1CV181, 2CV181, 1CV179, 2CV179,        211599  07      07 1CV172 &2CV172 MU S&C VAS., SCHEMATIC, CONTROLS R130    NO. 1A, 1B & 1C VITAL BUSES SAFEGUARD EQUIP. CONTROL SYSTEM,    211627  04      04 SCHEMATIC, SHEET 29, CONTROLS I
R130    NO. lA, 1B &1C VITAL BUSES SAFEGUARD EQUIP. CONTROL SYSTEM,    211630  03      03      I SCHEMATIC, SHEET 24, CONTROLS R130    NO. 1A, 1B &1C VITAL BUSES SAFEGUARD EQUIP. CONTROL SYSTEM,    211631  03      03 SCHEMATIC, SHEET 25, CONTROLS R130    NO. lA, 1B & 1C VITAL BUSES SAFEGUARD EQUIP. CONTROL SYSTEM,    211632  03      03 SCHEMATIC, SHEET 26, CONTROLS R130    NO. lA, 1B & 1C VITAL BUSES SAFEGUARD EQUIP. CONTROL SYSTEM,    211633  03      03 SCHEMATIC, SHEET 27, CONTROLS R130    NO. lA, 1B &lC VITAL BUSES SAFEGUARD EQUIP. CONTROL SYSTEM,    211634  02      02 SCHEMATIC, SHEET 28, CONTROLS N600    SAFETY INJ. SYSTEM TEST LINE VALVE, SCHEMATIC, SHEET 1,        211635  06      06 CONTROLS
* N600    SAFETY INJ. SYSTEM TEST LINE VALVE, SCHEMATIC, SHEET 2, CONTROLS 211636  09      09
 
    - - -
Page No. 38 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- --------
                                                                                  -------- ========
N600    1A &2A 4160V VITAL BUSES NO. 11 &21 SAFETY INJ. PUMP,          211637  08      08 SCHEMATIC, CONTROLS N600    lC &2C 4160V VITAL BUSES NO. 12 &22 SAFETY INJ. PUMP,          211638  08      08 SCHEMATIC, CONTROLS N620    lA &2A 4160V VITAL BUSES NO. 11 &21 CONT. SPRAY PUMP,          211639  12      12 SCHEMATIC, CONTROLS N620    lC &2C 4160V VITAL BUSES NO. 12 &22 CONT. SPRAY PUMP,          211640  13      13 SCHEMATIC, CONTROLS N600    SAFETY INJECTION SYSTEMS.I. PUMP SUCTION &DISCHARGE VALVES      211641  04      04 1SJ30, 12SJ40, 12SJ33, SCHEMATIC, SHEET 1, CONTROLS N600    SAFETY INJECTION SYSTEMS.I. PUMP SUCTION &DISCHARGE VALVES      211642  u        14 1SJ30, 12SJ40, 12SJ33, SCHEMATIC, SHEET 2, CONTROLS
* N600 N600 SAFETY INJECTION SYSTEM SAFETY INJECTION CONTROL VALVES 1SJ63, 2SJ63, 1SJ68, 2SJ68, SCHEMATIC, SHEET 1, CONTROLS SAFETY INJECTION SYSTEM SAFETY INJECTION CONTROL VALVES 1SJ63, 2SJ63, 1SJ68, 2SJ68, SCHEMATIC, SHEET 2, CONTROLS 211643 211644 04 09 04 09 N600    SAFETY INJECTION SYSTEM SAFETY INJECTION CONTROL VALVES        211645  02      02 1SJ19, 2SJ19, 1SJ67, 2SJ67, SCHEMATIC, SHEET 1, CONTROLS N600    SAFETY INJECTION SYSTEM SAFETY INJECTION CONTROL VALVES        211646  10      10 1SJ19, 2SJ19, 1SJ67, 2SJ67, SCHEMATIC, SHEET 2, CONTROLS N600    SAFETY INJECTION SYSTEM BORON INJECTION TK INLET &OUTLET        211647  03      03 VA'S. 1SJ4, 2SJ4, 1SJ12, 2SJ12, SCHEMATIC, SHEET 1, CONTROLS N600    SAFETY INJECTION SYSTEM BORON INJECTION TK INLET &OUTLET        211648  10      10 VA'S. 1SJ4, 2SJ4, 1SJ12, 2SJ12, SCHEMATIC, SHEET 2, CONTROLS N600    SAFETY INJECTION SYSTEM BORON INJECTION TK INLET &OUTLET        211649  03      03 VA'S. 1SJ5, 2SJ5, 1SJ13, 2SJ13, SCHEMATIC, SHEET 1, CONTROLS N600    SAFETY INJECTION SYSTEM BORON INJECTION TK INLET &OUTLET        211650  10      10 VA'S. 1SJ5, 2SJ5, 1SJ13, 2SJ13, SCHEMATIC, SHEET 2, CONTROLS N600    SAFETY INJECTION SYSTEM BIT OUTLET TO BAT. &DISCH. VA. TO      211651  03      03
* N600 RCS 1SJ78, 1SJ135, SCHEMATIC, SHEET 1, CONTROLS SAFETY INJECTION SYSTEM BIT OUTLET TO BAT. &DISCH. VA. TO RCS 1SJ78, 1SJ135, SCHEMATIC, SHEET 2, CONTROLS 211652  11      11
 
------                              --~-
                                                      -------~---------------
Page No. 39 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
      ------  ============================================================    ------- ======== ========
N600    SAFETY INJECTION SYSTEM BIT OUTLET TO BAT. &DISCH. VA. TO      211653  06      06 RCS 1SJ79, 12SJ134, SCHEMATIC, SHEET 1, CONTROLS N600    SAFETY INJECTION SYSTEM BIT OUTLET TO BAT. &DISCH. VA. TO      211654  09      09 RCS 1SJ79, 12SJ134, SCHEMATIC, SHEET 2, CONTROLS N620    CONTAINMENT SPRAY SYSTEM NO. 11 &21 SPRAY CONTROL VALVES        211656  01      01 NO. 11CS2, 21CS2, 1CS16, 2CS16, D.C. SCHEMATIC, CONTROLS N620    CONTAINMENT SPRAY SYSTEM NO. 11 &21 CONTAINMENT SPRAY PUMPS    211657  05      05 11CS2 &21CS2 DISCHARGE VALVES, SCHEMATIC, CONTROLS N600    SAFETY INJECTION SYSTEM TEST LINE ISOLATION VALVES 1SJ60 &      211658  08      08 2SJ60, SCHEMATIC, CONTROLS N620    CONTAINMENT SPRAY SYSTEM, SPRAY ADDITIVE TANK 1CS16 &2CS16      211659  04      04 DISCHARGE VALVES, SCHEMATIC, CONTROLS
* N620 N620 CONTAINMENT SPRAY SYSTEM, NO. 12 &22 SPRAY CONTROL VALVES 12CS2, 22CS2, 1CS17, 2CS17, D.C. SCHEMATIC, CONTROLS CONTAINMENT SPRAY SYSTEM, NO. 12 &22 CONTAINMENT SPRAY PUMPS 12CS2 &22CS2 DISCHARGE VALVES, SCHEMATIC, CONTROLS 211660 211661 01 05 01 05 N600    SAFETY INJECTION SYSTEM NO. 11 SI PUMP-LOW CC WTR. FLOW        211662  05      05 ALARM, SCHEMATIC, CONTROLS N620    CONTAINMENT SPRAY SYSTEM, SPRAY ADDITIVE TANK 1CS17 &2CS17      211663  04      04 DISCHARGE VALVES, SCHEMATIC, CONTROLS N620    CONTAINMENT SPRAY SYSTEM, SPRAY ADDITIVE TANK 1CS14 &2CS14      211666  07      07 DISCHARGE VALVES, SCHEMATIC, CONTROLS N600    SAFETY INJECTION SYSTEM BORON INJECTION TANK ISOL. VALVES      211667  07      07 1SJ108 &2SJ108, SCHEMATIC, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 11 &21 ACCUMULATOR CONTROL          211668  03      03 VALVES 11SJ54, 21SJ54, 11SJ93, 21SJ93, 11SJ58, 21SJ58, D.C.
SCHEMATIC, SHEET 1, CONTROLS N6DO    SAFETY INJECTION SYSTEM NO. 11 &21 ACCUMULATOR CONTROL          211669  14      14 VALVES 11SJ54, 21SJ54, 11SJ93, 21SJ93, 11SJ58, 21SJ58, D.C.
SCHEMATIC, SHEET 2, CONTROLS
* N600    SAFETY INJECTION SYSTEM NO. 11 &21 ACCUMULATOR CONTROL VALVES 11SJ27, 21SJ27, 11SJ57, 21SJ57, 11SJ20, 21SJ20, D.C.
SCHEMATIC, SHEET 1, CONTROLS 211670  03      03
 
                                            --                              -
Page No. 40 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
N600    SAFETY INJECTION SYSTEM NO. 11 &21 ACCUMULATOR CONTROL        211671  03      03 VALVES 11SJ27, 21SJ27, 11SJ57, 21SJ57, 11SJ20, 21SJ20, D.C.
SCHEMATIC, SHEET 2, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 11 &21 ACCUMULATOR CONTROL        211672  03      03 VALVES 12SJ58, 22SJ58, 12SJ54, 22SJ54, 12SJ93, 22SJ93, D.C.
SCHEMATIC, SHEET 1, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 12 &22 ACCUMULATOR CONTROL        211673  14      14 VALVES 12SJ54, 22SJ54, 12SJ93, 22SJ93, 12SJ58, 22SJ58, SCHEMATIC, SHEET 2, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 12 &22 ACCUMULATOR CONTROL        211674  03      03 VALVES 12SJ27, 22SJ27, 12SJ57, 22SJ57, 12SJ20, 22SJ20, D.C.
SCHEMATIC, SHEET 1, CONTROLS 500KV SWITCHYARD, 208V MISCELLANEOUS POWER, ONE LINE          211818  12      12
* DIAGRAM, ELECTRICAL T100    TURBINE E-H GOVERNOR CONTROL, ANALOG COMPARATOR CIRCUITS,      21285  03      03 LOGIC DIAGRAM, CONTROLS T100    TURBINE E-H GOVERNOR CONTROL STOP &GOVERNOR VALVE TEST,        212850  03      03 LOGIC DIAGRAM, CONTROLS T100    TURBINE E-H GOVERNOR CONTROL, BUMPLESS TRANSFER, LOGIC        212851  03      03 DIAGRAM, CONTROLS T100    TURBINE E-H GOVERNOR CONTROL NOS. 11,12,21 &22 STOP &GOV.      212852  03      03 VALVES TEST, LOGIC DIAGRAM, CONTROLS T100    TURBINE E-H GOVERNOR CONTROL NOS. 13, 14, 23 &24 STOP &        212853  03      03 GOV. VALVES TEST LOGIC DIAGRAM, CONTROLS T100    TURBINE E-H GOV. CONTROL AUTO. SETTER COUNTER &RATE CLOCK,    212855  03      03 LOGIC DIAGRAM, CONTROLS T100    TURBINE E-H GOV. CONTROL MAN. GOV. VALVE COUNTER &RATE        212856  03      03 CLOCK, LOGIC DIAGRAM, CONTROLS T100    TURBINE E-H GOV. CONTROL AUTO. REF. COUNTER &RATE CLOCK        212857  03      03 LOGIC DIAGRAM, CONTROLS
* T100    TURB. E-H GOV. CONTROL D.S. PROT. TRANSD. FAIL. LOAD CH. &
REF. FAIL. LOAD DROP ANTICIPATION &SPEED LOAD IND., LOGIC DIAGRAM, CONTROLS 212858  03      03
 
Page No. 41 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
TlOO    TURB. E-H GOV. CONTROL VA. POS. LIMIT SET PT., GO-HOLD,        212859  03      03 OFF-ON TEST AUTO-MAN. &LOSS OF POWER SUPPLY VOLTAGE, LOGIC DIAGRAM, CONTROLS TlOO    TURB. E-H GOV. CONTROL, ANALOG SECTION, LOGIC DIAGRAM,          212860  03      03 CONTROLS T600    TURBINE GENERATOR TURBINE TRIP REGULAR BACK-UP, D.C.            212861  05      05 SCHEMATIC, CONTROLS E130    NO. 2 UNIT 2F 4160V GROUP BUS 4160/208V TRANSF. FDR. C.B.      212864  03      03 2F3D, D.C. SCHEMATIC, CONTROLS E130    NO. 2 UNIT 2F 4160V GROUP BUS 4160/208V TRANSF. FDR. C.B.      212865  03      03 2F6D, D.C. SCHEMATIC, CONTROLS E120    NO. 2 UNIT 13KV BUS SECTION 1&4 VOLTMETERS, D.C. SCHEMATIC,    212866  04      04
* CONTROLS MBOO    NO. 1&2 UNITS-4160V GROUP BUSES NO. 1,2&3 STATION AIR          212872  03      03 COMPRESSORS LOADING SEQUENCE &ALARMS, SCHEMATIC, SHEET 2, CONTROLS MBOO    NO. 2 UNIT 2G 4160V GROUP BUS NO. 2 STATION AIR COMPRESSOR      212879  06      06 LOADING SEQUENCE &ALARMS, SCHEMATIC, SHEET 1, CONTROLS E130    NO. 2 UNIT 2G 4160V GROUP BUS NO. 2 STATION AIR COMPRESSOR,    212880  07      07 SCHEMATIC, CONTROLS MBOO    NO. 2 UNIT 2G 4160V GROUP BUS NO. 2 STATION AIR COMPRESSOR,    212881  06      06 SCHEMATIC, CONTROLS F200    460 &230V AUXS. NO. 12 &22 VAC. &SEAL WTR. PUMPS,              212886  13      13 SCHEMATIC, CONTROLS F200    460 &230V AUXS. NO. 13 &23 VAC. &SEAL WTR. PUMPS,              212887  13      13 SCHEMATIC, CONTROLS F200    460 &230V AUXS. NO. 14 &24 VAC. &SEAL WTR. PUMPS,              212888  11      11 SCHEMATIC, CONTROLS T900    4160V GROUP BUSES NO. 11 &21 TURBINE AUX. COOLING PUMPS,        212894  08      08 SCHEMATIC, SHEET 1, CONTROLS
* T900    4160V GROUP BUSES NO. 11 &21 TURBINE AUX. COOLING PUMPS, SCHEMATIC, SHEET 2, CONTROLS 212895  03      03
 
Page No. 42 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
T900    4160V GROUP BUSES NO. 12 &22 TURBINE AUX. COOLING PUMPS,      212896  05      05 SCHEMATIC, SHEET 1, CONTROLS T900    4160V GROUP BUSES NO. 12 &22 TURBINE AUX. COOLING PUMPS,      212897  03      03 SCHEMATIC, SHEET 2, CONTROLS T900    4160V GROUP BUSES NO. 13 &23 TURBINE AUX. COOLING PUMPS,      212898  04      04 SCHEMATIC, SHEET 1, CONTROLS T9DD    4160V GROUP BUSES NO. 13 &23 TURBINE AUX. COOLING PUMPS,      212899  03      03 SCHEMATIC, SHEET 2, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 12 &22 ACCUMULATOR CONTROL        217125  04      04 VALVES 12SJ27, 22SJ27, 12SJ57, 22SJ57, 12SJ20, 22SJ20, D.C.
SCHEMATIC, SHEET 2, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 13 &23 ACCUMULATOR CONTROL        217126  03      03
* VALVES 13SJ54, 23SJ54, 13SJ93, 23SJ93, 13SJ58, 23SJ58, D.C .
SCHEMATIC, SHEET 1, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 13 &23 ACCUMULATOR CONTROL        217127  15      15 VALVES 13SJ54, 23SJ54, 13SJ93, 23SJ93, 13SJ58, 23SJ58, SCHEMATIC, SHEET 2, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 13 &23 ACCUMULATOR CONTROL        217128  03      03 VALVES 13SJ27, 23SJ27, 13SJ57, 23SJ57, 13SJ20, 23SJ20, D.C.
SCHEMATIC, SHEET 1, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 13 &23 ACCUMULATOR CONTROL        217129  03      03 VALVES 13SJ27, 23SJ27, 13SJ57, 23SJ57, 13SJ20, 23SJ20, D.C.
SCHEMATIC, SHEET 2, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 14 &24 ACCUMULATOR CONTROL        217130  03      03 VALVES 14SJ54, 24SJ54, 14SJ93, 24SJ93, 14SJ58, 2~SJ58, D.C.
SCHEMATIC, SHEET 1, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 14 &24 ACCUMULATOR CONTROL        217131  15      15 VALVES 14SJ54, 24SJ54, 14SJ93, 24SJ93, 14SJ58, 24SJ58, D.C.
SCHEMATIC, SHEET 2, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 14 &24 ACCUMULATOR CONTROL        217132  03      03 VALVES 14SJ27, 24SJ27, 14SJ57, 24SJ57, 14SJ20, 24SJ20, D.C.
SCHEMATIC, SHEET 1, CONTROLS
* N600    SAFETY INJECTION SYSTEM NO. 14 &24 ACCUMULATOR CONTROL VALVES 14SJ27, 24SJ27, 14SJ57, 24SJ57, 14SJ20, 24SJ20, D.C.
SCHEMATIC, SHEET 2, CONTROLS 217133  03      03
 
                  ---                                                            -              ---------
Page No. 43 11/28/89 SALEM SiMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING  REVISION 11/01/89
  ------  ============================================================  -------  ======== ========
N600    SAFETY INJECTION SYSTEM ACCUM. N2 SUP. &TEST LINE CONTR.      217134    04      04 VALVES 1NT32, 2NT32, 11SJ50, 21SJ50, SCHEMATIC, SHEET 1, CONTROLS N600    SAFETY INJECTION SYSTEM ACCUM. N2 SUP. &TEST LINE CONTR.      217135    07      07 VALVES 1NT32, 2NT32, 11SJ50, 21SJ50, SCHEMATIC, SHEET 2, CONTROLS N600    SAFETY INJECTION SYSTEM TEST LINE CONTR. VALVES 1SJ123,        217136    04      04 2SJ123, 12SJ50, 22SJ50, SCHEMATIC, SHEET 1, CONTROLS N600    SAFETY INJECTION SYSTEM TEST LINE CONTR. VALVES 1SJ123,        217137    07      07 2SJ123, 12SJ50, 22SJ50, SCHEMATIC, SHEET 2, CONTROLS N600    SAFETY INJECTION SYSTEM RECIRCULATING INTERCONNECTION VALVE    217139    07      07 11SJ113, SCHEMATIC, CONTROLS
* N600    SAFETY INJECTION SYSTEM RECIRCULATING INTERCONNECTION VALVE    217140    08      08 12SJ113 &22SJ113, SCHEMATIC, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 12 SI PUMP-LOW CC WTR. FLOW        217141    08      08 ALARM, SCHEMATIC, CONTROLS N600    SAFETY INJECTION SYSTEM SPRAY ADDITIVE TK &RWST LEVEL          217142    09      09 ALARMS, SCHEMATIC, CONTROLS N600    NO. 2 UNIT SAFETY INJECTION PUMPS 21SJ45 RECIRCULATION        217152    05      05 VALVE, SCHEMATIC, CONTROLS N620    NO. 2 UNIT CONTAINMENT SPRAY SYSTEM NO. 21, CONTAINMENT        217153    03      03 SPRAY PUMP 21CS36 RECIRCULATION VALVE, SCHEMATIC, CONTROLS N620    CONTAINMENT SPRAY SYSTEM NO. 22 CONTAINMENT SPRAY PUMP        217154    03      03 22CS36 RECIRCULATION VALVE, SCHEMATIC, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 11 S.I. PMP. SUCTION &DISCH.      217156    03      03 VAS. 11SJ33, 11SJ40, SCHEMATIC, SHEET 1, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 11 S.I. PMP. SUCTION &DISCH.      217157    08      08 VAS. 11SJ33, 11SJ40, SCHEMATIC, SHEET 2, CONTROLS N600    SAFETY INJECTION SYSTEM NO. 11 S.I. PMP. DISCH. VAS. TO        217158    04      04 COLDLEG 11SJ134, SCHEMATIC, CONTROLS
* R130    NO. 2 UNIT 2A VITAL BUS SAFEGUARDS EMERGENCY INDICATION, SCHEMATIC, SHEET 1, CONTROLS 217163    05      05
 
                                                                                    ---------
Page No. 44 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING  REVISION 11/01/89
    ------  ============================================================  -------  ======== ========
R130    NO. 2 UNIT 2A VITAL BUS SAFEGUARDS EMERGENCY INDICATION,      217164    07      07 SCHEMATIC, CONTROLS R130    NO. 2 UNIT 2B VITAL BUS SAFEGUARDS EMERGENCY INDICATION,      217165    05      05 SCHEMATIC SHEET 1, CONTROLS R130    NO. 2 UNIT 2B VITAL BUS SAFEGUARDS EMERGENCY INDICATION,      217166    07      07 SCHEMATIC, CONTROLS R130    NO. 2 UNIT 2C VITAL BUS SAFEGUARDS EMERGENCY INDICATION,      217167    05      05 SCHEMATIC SHEET 1, CONTROLS R130    NO. 2 UNIT 2C VITAL BUS SAFEGUARDS EMERGENCY INDICATION,      217168    06      06 SCHEMATIC, CONTROLS M940    CONT. VENT. NO. 14 &24 REAC. NOZZLE SUP. VENT FANS,            218040    08      08 SCHEMATIC, CONTROLS
* T900 F200 F800 4160V GROUP BUSES, TURBINE AUXILIARY COOLING PUMPS, LOGIC DIAGRAM, CONTROLS CONDENSER PRESSURE TRANSMITTERS, SCHEMATIC, CONTROLS TURBINE GENERATOR L.P. TURB. EXHAUST HOOD SPRAY TEMP.
218459 218461 218462 04 02 02 04 02 02 SCHEMATIC, CONTROLS T200    TURBINE GENERATOR START-UP DR. VAS. TO 11-13 CONDS.,          218463    05      05 SCHEMATIC, CONTROLS T200    TURBINE GENERATOR START-UP DR. VAS. TO 11 CONDS., SCHEMATIC    218464    06      06 SHEET 1, CONTROLS T200    TURBINE GENERATOR START-UP DR. VAS. TO 11 CONDS., SCHEMATIC    218465    07      07 SHEET 2, CONTROLS T200    TURBINE GENERATOR START-UP DR. VAS. TO 11 CONDS., SCHEMATIC    218466    09      09 SHEET 3, CONTROLS T200    TURBINE GENERATOR START-UP DR. VAS. TO 12 CONDS., SCHEMATIC    218467    04      04 SHEET 1, CONTROLS T200    TURBINE GENERATOR START-UP DR. VAS. TO 12 CONDS., SCHEMATIC    218468    04      04
* SHEET 2, CONTROLS T200    TURBINE GENERATOR START-UP DR. VAS. TO 12 CONDS., SCHEMATIC    218469    03      03 SHEET 3, CONTROLS I
I L
 
                                                    -- -        ---    - - -  - -
Page No. 45 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                            DRAWING REVISION 11/01/89
  ------  ============================================================      ------- ======== ========
T200    TURBINE GENERATOR START-UP DR. VAS. TO 13 CONDS., SCHEMATIC      218470  04      04 SHEET 1, CONTROLS T200    TURBINE GENERATOR START-UP DR. VAS. TO 13 CONDS., SCHEMATIC      21M71  04      04 SHEET 2, CONTROLS T200    TURBINE GENERATOR START-UP DR. VAS. TO 13 CONDS., SCHEMATIC      218472  02      02 SHEET 3, CONTROLS T200    TURBINE GENERATOR TURBINE EXTRACTION STOP VALVES, SCHEMATIC,      218473  08      08 SHEET 1, CONTROLS T200    TURBINE GENERATOR TURBINE EXTRACTION STOP VALVES, SCHEMATIC,      218474  07      07 SHEET 2, CONTROLS R130    NO. 1&2 CONTROL ROOMS RECORDER PANELS 1RP4 &2RP4 REAC.            218487  00      OD PROT. SYS. STATUS PANEL, DRILLING PLAN, SH. 1, CONTROLS
* R170 R400 2RP4 REACTOR PROTECTION SYSTEM STATUS PANEL FRONT VIEW ( SET OF 3 DRAWINGS )
REACTOR PROTECTION SYSTEM STATUS NUC. INST. TRIP SIG. &MAN.
TRIP, SCHEMATIC, CONTROLS 218489 218490 17 04 17 04 RlOO    REACTOR PROTECTION SYSTEM STATUS NUC. INST. PERMISSIVES &        218491  07      07 BLOCKS, SCHEMATIC, CONTROLS R170    REACTOR PROTECTION SYSTEM STATUS PRIM. COOLANT SYS. TRIP          218492  03      03 SIGNALS, SCHEMATIC SHEET 1, CONTROLS R170    REACTOR PROTECTION SYSTEM STATUS PRIM. COOLANT SYS. TRIP          218493  04      04 SIGNALS, SCHEMATIC SHEET 2, CONTROLS R170    REACTOR PROTECTION SYSTEM STATUS PRESSURIZER TRIP SIGNALS,        218494  05      05 SCHEMATIC, CONTROLS R170    REACTOR PROTECTION SYSTEM STATUS STEAM GENERATOR TRIP            218495  03      03 SIGNALS, SCHEMATIC SHEET 1, CONTROLS R170    REACTOR PROTECTION SYSTEM STATUS STEAM GENERATOR TRIP            218496  03      03 SIGNALS, SCHEMATIC SHEET 2, CONTROLS R170    REACTOR PROTECTION SYSTEM STATUS STEAM GENERATOR TRIP            218497  03      03
* R170 SIGNALS, SCHEMATIC SHEET 3, CONTROLS REACTOR PROTECTION SYSTEM STATUS SAFEGUARD ACT. &STM. DUMP CONTR., SCHEMATIC, CONTROLS 218498  04      04
 
                                                                                  -------------------
Page No. 46 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING  REVISION 11/01/89
  ------  ============================================================    -------  ======== ========
R170    REACTOR PROTECTION SYSTEM STATUS TURB. TRIP, RUNBACKS &        218499  03      03 OTHER SIGS.,SCHEMATIC, CONTROLS M921    CONTROL AREA A.C. NO. 11,21,12,22,13&23 CONTROL ROOM AIR        218655  06      06 CONDITIONING FANS, SCHEMATIC, CONTROLS M921    CONTROL AREA A.C. BATTERY ROOMS EXHAUST FAN, SCHEMATIC,        218656  05      05 CONTROLS M940    CONTAINMENT VENTILATION FAN-COIL UNIT INSTRUMENTS,              218658  01      01 SCHEMATIC, CONTROLS M910    AUX. BUILDING VENTILATION R.H.R PUMP ROOM COOLERS, A.C. &      218659  04      04 D.C. SCHEMATIC, CONTROLS M910    AUX. BUILDING VENTILATION CHARGING PUMP ROOM COOLERS, A.C.      218660  06      06 SCHEMATIC, CONTROLS
* M910 M910 AUX. BUILDING VENTILATION CONTAINMENT PUMP ROOM COOLERS, A.C. &D.C. SCHEMATIC, CONTROLS AUX. BUILDING VENTILATION SAFETY INJECTION PUMP ROOM COOLERS, A.C. SCHEMATIC, CONTROLS 218661 218662 05 03 05 03 M910    AUX. BUILDING VENTILATION COMPONENT COOLING PUMP ROOM          218663  05      05 COOLERS, A.C. SCHEMATIC, CONTROLS M910    AUX. BUILDING VENTILATION AUX. FEEDWATER PUMP COOLERS, A.C. 218664  05      05 SCHEMATIC, CONTROLS M910    AUX. BUILDING VENTILATION SWITCHGEAR ROOM SUPPLY FANS, D.C. 218665  07      07 SCHEMATIC, CONTROLS M910    AUX. BUILDING VENTILATION SWITCHGEAR ROOM EXHAUST FANS, A.C. 218666  03      03 SCHEMATIC, CONTROLS M910    AUX. BUILDING VENTILATION PENETRATION AREA EXHAUST FANS,        218667  04      04 A.C. SCHEMATIC, CONTROLS M921    NO. 1 CONTROL AREA A. C DAMPERS CONTROLS INDICATION            218670  13      13 M921    NO. 1 CONTROL AREA A.C. DAMPERS CONTROLS INDICATION            218671  12      12
* M921    CONTROL AREA A.C. DAMPERS CONTROLS &INDICATION, SCHEMA TIC, SHEET 3, CONTROLS 218672  14      14
 
                                                                                          -----~--~-
Page No. 47 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
          ------  ============================================================    ------- ======== ========
M921    F.H. BUILDING VENTILATION TEMPERATURE &DIFF. PRESSURE          218673  02      02 CONTROL, SCHEMATIC, CONTROLS M940    CONTAINMENT VENT. FAN-COIL UNITS SERV. WTR. CONTR.,            218674  11      11 SCHEMATIC, CONTROLS R400    NUC. INSTR. SYSTEM SR &IR INDICATORS, A.C. &D.C.                218825  06      06 SCHEMATIC, CONTROLS R400    NUC. INSTR. SYSTEM POWER RANGE INDICATORS, A.C. &D.C.          218826  04      04 SCHEMATIC, CONTROLS R400    NUC. INSTR. SYSTEM PR NEUTRON FLUX NR41, NR42 RECORDERS,        218827  02      02 A.C. & D.C. SCHEMATIC, CONTROLS R400    NUC. INSTR. SYSTEM PR NEUTRON FLUX NR43, NR44 RECORDERS,        218828  02      02 A.C. &D.C. SCHEMATIC, CONTROLS
* R400 R400 NUC. INSTR. SYSTEM OVERPOWER RECS. &CHS. ON TEST, A.C. &
D.C. SCHEMATIC, CONTROLS NUC. INSTR. SYSTEM POWER RANGE REC. NR-45 PEN 1 SEL., D.C.
SCH. SHEET 1, CONTROLS 218829 218830 05 05 05 05 R400    NUC. INSTR. SYSTEM POWER RANGE REC. NR-45 PEN 2 SEL., D.C.      218831  05      05 SCH. SHEET 2, CONTROLS R400    NUC. INSTR. SYSTEM POWER RANGE REC. NR-45, AC&DC SCH. SHEET    218832  06      06 3, CONTROLS N210      COMPONENT COOLING SYSTEM NO. 1CC187 &2CC187 RCP CW ISOL        218846  11      11 VA'S., SCHEMATIC, CONTROLS N210      COMPONENT COOLING SYSTEM NO. 1CC190 &2CC190 RCP THRM.          218847  13      13 BARRIER !SOL VA., SCHEMATIC, CONTROLS N100      eves NO. 1CV243 &2CV243 VOLUME CONTROL TK. DEGASSER VALVES,    218848  01      01 SCHEMATIC, CONTROLS N100      NO. 2 UNIT eves NO. 21 CHARGING PUMP, SCHEMATIC, CONTROLS      218861  08      08 NlOO    NO. 2 UNIT eves NO. 22 CHARGING PUMP &NO. 22 CHARGING PUMP      218862  05      05 AUX. LUBE OIL PUMP, SCHEMATIC, CONTROLS
* N100    NO. 2 UNIT eves NO. 22 CHARGING PUMP, SCHEMATIC, CONTROLS      218863  08      08 I
L___ _ _ _  ----
 
                                                              ---------~
Page No. 48 11/28/89
.,                                                    SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number STATION TRAINING LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
N110    NO. 2 UNIT eves NO. 23 CHARGING PUMP, SCHEMATIC, CONTROLS      218864  07      07 N100    NO. 2 UNIT CVCS-NO. 22SJ45 CHG. SYS. SUCT. FROM RHR PUMPS &    218865  06      06 NO. 2CV75 RCS AUX. SPRAY !SOL. VAS., SCHEMATIC, CONTROLS NlOO    NO. 2 UNIT CVCS-NO. 21 BORIC ACID TRANSFER PUMP, SCHEMA TIC,  218866  05      05 CONTROLS N100    NO. 2 UNIT CVCS-NO. 21 BORIC ACID TRANSFER PUMP, SCHEMATIC,    218867  06      06 CONTROLS N100    NO. 2 UNIT eves-NO. 22 BORIC ACID TRANSFER PUMP, SCHEMATIC    218868  04      04 SHEET 1, CONTROLS N100    NO. 2 UNIT eves-NO. 22 BORIC ACID TRANSFER PUMP, SCHEMATIC    218869  05      05 SHEET 2, CONTROLS
* N100    NO. 2 UNIT eves-NO. 21 PRI WATER MAKE-UP PUMP, SCHEMATIC,      218870  06      06 SHEET 1, CONTROLS N100    NO. 2 UNIT CVCS-NO. 21 PRI WATER MAKE-UP PUMP, SCHEMATIC,      218871  05      05 SHEET 2, CONTROLS NlOO    NO. 2 UNIT eves-NO. 22 PRI WATER MAKE-UP PUMP, SCHEMATIC,      218872  05      05 SHEET 1, CONTROLS NlOO    NO. 2 UNIT CVCS-NO. 22 PRI WATER MAKE-UP PUMP, SCHEMATIC,      218873  03      03 SHEET 2, CONTROLS R140    PROCESS GROUP 1, 115V. AC VITAL INSTR. BUS DISTRIBUTION,      218875  03      03 SCHEMATIC, CONTROLS R140    PROCESS GROUP 1, 115V. AC MAC DISTRIBUTION, SCHEMATIC,        218876  01      01 CONTROLS Rl40    PROCESS GROUP 2, 115V. AC VITAL INSTR. BUS DISTRIBUTION,      218878  03      03 SCHEMATIC, CONTROLS R140    PROCESS GROUP 2, 115V. AC MAC DISTRIBUTION, SCHEMATIC,        218879  01      01 CONTROLS R140    PROCESS GROUP 3, 115V. AC VITAL INSTR. BUS DISTRIBUTION,      218881  05      05
* SCHEMATIC, CONTROLS R140    PROCESS GROUP 3, 115V. AC MAC DISTRIBUTION, SCHEMATIC,        218882  01      01 CONTROLS
 
-                                                                  - -
Page No. 49 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
    ------  ============================================================  ------- ======== ========
RHO      PROCESS GROUP 4, 115V. AC VITAL INSTR. BUS DIST., SCHEMATIC,  218884  07      07 CONTROLS R140    PROCESS GROUP 4, 115V. AC MAC DISTRIBUTION, SCHEMATIC,        218885  02      02 CONTROLS NlOO    CVCS-NO. 1CV172 &2CV172 BA FLOW CONTROL VALVES, SCHEMA TIC,    218891  05      05 CONTROLS NlOO    CVCS-NO. 1CV179 &2CV179 PRIMARY WTR. FLOW CONTROL VALVES,      218892  05      05 SCHEMATIC, CONTROLS N100    eves-NO. 13&23 CHARGING PUMP SPEED CONT. &CHG. FLOW DEMAND    218893  05      05 CONTROL, SCHEMATIC, CONTROLS N100    eves-NO. 1CV71, 2CV71, 1CV55 &2CV55 CHG. FLOW &PRESS.          218894  05      05 CONTROL VALVES, SCHEMATIC, CONTROLS
* NlOO NlOO eves-NO. 1CV8, 2CV8, 1CV18 &2CV18 LETDOWN FLOW &PRESS.
CONTROL VALVES, SCHEMATIC, CONTROLS CVCS-NO. 1CC71, 2CC71 LETDOWN TEMP. CONTROL VALVES, SCHEMATIC, CONTROLS 218895 218896 05 01 05 01 NlOO    CVCS-NO. 11CV160, 12CV160,21CV160,22CV160 BORIC ACID RECIRC. 218897  03      03 VALVES, SCHEMATIC, CONTROLS R200    OVERPOWER DELTA T, OVERTEMP DELTA T &LOOP DELTA T RECORDER    218898  03      03 TA-5307 RB SELECTION CONTROLS R200    REAC. COOLANT SYS. LOOPS DELTA T SIGNAL DEFEAT SEL.,          218899  03      03 SCHEMATIC, CONTROLS R200    REAC. COOLANT SYS. LOOPS T AVG. SIGNAL DEFEAT SEL.,            218903  03      03 SCHEMATIC, CONTROLS N210    COMPONENT COOLING SYSTEM NO. 1CC131 &2CC131 RCP THERMAL        218911  10      10 BARRIER CW FLOW CONTROL VALVES, SCHEMATIC, SHEET 2, CONTROLS
  ,.
R120    REAC. PROT. SYSTEM MANUAL &AUTO. ROD WITHDRAWAL BLOCK &        218913  06      06 TURBINE RUNBACK, SCHEMATIC, CONTROLS R120    REAC. PROT. SYSTEM SR, IR &PR ALARMS &CONTAINMENT              218914  13      13 EVACUATION HORN, SCHEMATIC, CONTROLS
                                                                                                      'i J
 
                                                              ---~-
Page No. 50 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
R120    NO. 1&2 UNITS REAC. PROT. SYSTEM HIGH STEAM LINE FLOW          218916  04      04 REFERENCE REACT. TRIP TRAIN 'A' &'B' INTERRUPT, SCHEMATIC, CONTROLS E170    13KV. SWITCHGEAR NO. 21 STA. PWR. TRANSF. 13/4KV. RELAY        219350  04      04 PROTECTION, A.C. SCHEMATIC, CONTROLS E170    13KV. SWITCHGEAR NO. 21 STA. PWR. TRANSF. 13/4KV. RELAY        219351  06      06 PROTECTION, D.C. SCHEMATIC, CONTROLS E170    13KV. SWITCHGEAR NO. 22 STA. PWR. TRANSF. 13/4KV. RELAY        219353  04      04 PROTECTION, A.C. SCHEMATIC, CONTROLS E170    13KV. SWITCHGEAR NO. 22 STA. PWR. TRANSF. 13/4KV. RELAY        219354  08      08 PROTECTION, D.C. SCHEMATIC, CONTROLS E120    NO. 2 UNIT-NO. 21 13/4KV MULTI-TRIP RELAY PROTECTION, D.C. 219356  03      03
* SCHEMATIC, CONTROLS E120    NO. 2 UNIT-NO. 22 13/4KV MULTI-TRIP RELAY PROTECTION, D.C. 219357  04      04 SCHEMATIC, CONTROLS E120    13KV SWITCHGEAR BREAKER MECH. &ELEV. CIRCUITS, SCHEMATIC,      219360  02      02 CONTROLS GlOO    460V BUSES, BLEED STEAM COIL DRAIN TK. PUMPS, LOGIC DIAGRAM,  220262  03      03 CONTROLS E700    NO. 2 UNIT NO. 21-23 AUXS. CONTROL SYSTEM MISC. CONT. CONS. 220268  06      06 IND. A.C. SUP., SCHEMATIC, CONTROLS E700    NO. 2 UNIT NO. 24-26 AUXS. CONTROL SYSTEMS MISC. CONT. CONS. 220269  08      08 IND. A.C. SUP., SCHEMATIC, CONTROLS E700    NO. 2 UNIT NO. 27&28 AUXS. CONTROL SYSTEM MISC. CONT. CONS. 220270  04      04 IND. A.C. SUP., SCHEMATIC, CONTROLS F200    NO. 1 UNIT-460 &230V. AUXILIARIES, NO. 11 VACUUM &SEAL        220325 WATER PUMPS, LOGIC DIAGRAM, SHEET 1, CONTROLS F200    NO. 1 UNIT-460 &230V. AUXILIARIES, NO. 11 VACUUM &SEAL        220326 WATER PUMPS, LOGIC DIAGRAM, SHEET 2, CONTROLS
* G100    460V. BUSES #12 &22 BLEED STEAM COIL DR. TK. PUMPS, SCHEMATIC, SHEET 1, CONTROLS 220328  03      03
 
          --~-                                                            ------    - -      -    --
Page No. 51 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                            DRAWING    REVISION 11/01/89
  ------    ============================================================    -------    ======== ========
G100      460V. BUSES #12 &22 BLEED STEAM COIL DR. TK. PUMPS,              220329      02      02 SCHEMATIC, SHEET 2, CONTROLS G220      REHEAT STEAM SYS. POWER DISTRIBUTION, SCHEMATIC, CONTROLS        220331      02      02 G220      REHEAT STEAM SYS. NO. 11&21 L.P. TEMP. CONTROL, SCHEMATIC,      220332      04      04 CONTROLS G220      REHEAT STEAM SYS. NO. 12&22 L.P. TEMP. CONTROL, SCHEMATIC,      220333      04      04 CONTROLS G220      REHEAT STEAM SYS. NO. 13&23 L.P. TEMP. CONTROL, ANALOG          220334      04      04 SCHEMATIC, CONTROLS G220      REHEAT STEAM SYS. NO. 11&21 L.P. INTERLOCKS, SCHEMATIC SHEET    220335      07      07 1, CONTROLS
* G220      REHEAT STEAM SYS. NO. 12&22 L.P. INTERLOCKS, SCHEMATIC SHEET    220336      07      07 1, CONTROLS G220      REHEAT STEAM SYS. NO. 13&23 L.P. INTERLOCKS, SCHEMATIC SHEET    220337      07      07 1, CONTROLS G220      REHEAT STEAM SYS. MASTER &ALARM INTERLOCKS, SCHEMATIC SHEET      220338      07      07 1, CONTROLS G220      REHEAT STEAM SYS. MASTER NO. 11&21 L. P. INPUTS, SCHEMATIC,      220339      04      04 CONTROLS G220      REHEAT STEAM SYS. NO. 12, 13,22&23 L.P. INPUTS, SCHEMATIC,      220340      04      04 CONTROLS E700      NO. 2 UNIT NO. 21 AUXS. CONTROL SYSTEM AUDIBLE ALARMS &          220353      05      05 RESET, SCHEMATIC, SHEET 1, CONTROLS E700      NO. 2 UNIT NO. 21 AUXS. CONTROL SYSTEM AUDIBLE ALARMS &          220354      04      04 RESET, SCHEMATIC, SHEET 2, CONTROLS E700      NO. 2 UNIT NO. 22 AUXS. CONTROL SYSTEM AUDIBLE ALARMS &          220355      05      05 RESET, SCHEMATIC, SHEET 1, CONTROLS E700      NO. 2 UNIT NO. 22 AUXS. CONTROL SYSTEM AUDIBLE ALARMS &          220356      06      06 RESET, SCHEMATIC, SHEET 2, CONTROLS
* E700      NO. 2 UNIT NO. 23 AUXS. CONTROL SYSTEM, SCHEMATIC, SHEET 1, CONTROLS 220357      04      04
 
Page No. 52 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
E700    NO. 2 UNIT NO. 23 AUXS. CONTROL SYSTEM AUDIBLE ALARMS &        220358  04      04 RESET, SCHEMATIC, SHEET 2, CONTROLS E700    NO. 2 UNIT NO. 24 AUXS. CONTROL SYSTEM AUDIBLE ALARMS &        220359  06      06 RESET, SCHEMATIC, SHEET 1, CONTROLS E700    NO. 2 UNIT NO. 24 AUX. CONTROL SYSTEM AUDIBLE ALARMS &          220360  11      11 RESET, SCHEMATIC, SHEET 2, CONTROLS E700    NO. 2 UNIT NO. 25 AUXS. CONTROL SYSTEM AUDIBLE ALARMS &        220361  04      04 RESET, SCHEMATIC, SHEET 1, CONTROLS E700    NO. 2 UNIT NO. 25 AUXS. CONTROL SYSTEM AUDIBLE ALARMS &        220362  07      07 RESET, SCHEMATIC, SHEET 2, CONTROLS E700    NO. 2 UNIT NO. 26 AUXS. CONTROL SYSTEM AUDIBLE ALARMS &        220363  04      04 RESET, SCHEMATIC, SHEET 1, CONTROLS
* E700 R170 NO. 2 UNIT NO. 26 AUXS. CONTROL SYSTEM AUDIBLE ALARMS &
RESET, SCHEMATIC, SHEET 2, CONTROLS REACTOR PROTECTION SYSTEM STATUS 1A SAFEGUARD LOADING SEQUENCE, SCHEMATIC, CONTROLS 220364 220365 07 05 07 05 R170    REACTOR PROTECTION SYSTEM STATUS 1B SAFEGUARD LOADING          220366  05      05 SEQUENCE, SCHEMATIC, CONTROLS R170    REACTOR PROTECTION SYSTEM STATUS 1C SAFEGUARD LOADING          220367  03      03 SEQUENCE, SCHEMATIC, CONTROLS R170    REACTOR PROTECTION SYSTEM STATUS CONTAINMENT VENT. &ISOL.      220368  04      04 VALVES, SCHEMATIC SHEET 1, CONTROLS R170    REACTOR PROTECTION SYSTEM STATUS CONTAINMENT VENT. &ISOL.      220369  03      03 VALVES, SCHEMATIC SHEET 2, CONTROLS R170    REACTOR PROTECTION SYSTEM STATUS PHASE 'A' ISOLATION VALVES    220370  04      04 R170    REACTOR PROTECTION SYSTEM STATUS PHASE 'A' ISOLATION VALVES    220371  04      04 R170    REACTOR PROTECTION SYSTEM STATUS STEAM LINE ISOLATION VALVE,    220372  06      06 SCHEMATIC, CONTROLS I
* R170    REACTOR PROTECTION SYSTEM STATUS PHASE 'B' ISOL B CONT.
SPRAY VALVES 220373  04      04        I I
I I
I I
J
 
                                                                                                  -  ----- ------
Page No. 53 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
R170    REACTOR PROTECTION SYSTEM STATUS SAFETY INJECTION VALVE,        220374  06      06 SCHEMATIC, CONTROLS R170    REACTOR PROTECTION SYSTEM STATUS SAFETY INJECTION VALVE,        220375  03      03 SCHEMATIC, SHEET 2, CONTROLS R170    REACTOR PROTECTION SYSTEM STATUS SAFETY INJECTION/BLACKOUT,    220376  02      02 SCHEMATIC, CONTROLS Rl70    REACTOR PROTECTION SYSTEM STATUS RECIRCULATION PHASE-COMMON,    220377  05      05 SCHEMATIC, CONTROLS R170    REACTOR PROTECTION SYSTEM STATUS RECIRCULATION PHASE-COLD      220378  05      05 LEG &HOT LEG, SCHEMATIC, CONTROLS G220    REHEAT STEAM SYS. NO. 11&21 L.P. INTERLOCKS, SCHEMATIC SHEET    220380  04      04 2, CONTROLS
* G220 G220 REHEAT STEAM SYS. NO. 12&22 L.P. INTERLOCKS, SCHEMATIC SHEET 2, CONTROLS REHEAT STEAM SYS. NO. 13&23 L.P. INTERLOCKS, SCHEMATIC SHEET 2, CONTROLS 220381 220382 04 04 04 o~
G220    REHEAT STEAM SYS. MASTER &ALARM INTERLOCKS, SCHEMATIC SHEET    220383  03      03 2, CONTROLS G220    REHEAT STEAM SYS. MASTER &ALARM INTERLOCKS, SCHEMATIC,          220384  01      01 SHEET 3, CONTROLS G220    REHEAT STEAM SYS., CONTROL INPUTS &INDICATION, LOGIC            220385  03      03 DIAGRAM, CONTROLS G220    REHEAT STEAM SYS., MASTER &ALARM INTERLOCKS, LOGIC DIAGRAM,    220386  03      03 CONTROLS G220    REHEAT STEAM SYS., L.P. INTERLOCKS, LOGIC DIAGRAM, SHEET 1,    220387  03      03 CONTROLS G220    REHEAT STEAM SYS., L.P. INTERLOCKS, LOGIC DIAGRAM, SHEET 2,    220388  03      03 CONTROLS E700    NO. 2 UNIT NO. 28 AUXS. CONTROL SYSTEM AUDIBLE ALARMS &        220391  03      03
* E700 RESET, SCHEMATIC, CONTROLS NO. 2 UNIT NO. 29 AUXS. CONTROL SYSTEM AUDIBLE ALARMS &
RESET, SCHEMATIC, CONTROLS 220392  DO      DD
 
                                                                                                  ------~-
Page No. 54 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
E700    NO. 2 UNIT NO. 27 AUXS. CONTROL SYSTEM AUDIBLE ALARMS &        220393  11      11 RESET, SCHEMATIC SHEET 1, CONTROLS E700    NO. 2 UNIT NO. 27 AUXS. CONTROL SYSTEM AUDIBLE ALARMS &        220394  09      09 RESET, SCHEMATIC SHEET 2, CONTROLS N210    FUNCT. DIAGRAMS INDEX &SYMBOLS, CONTROLS                      220400  06      06 N220    AUX. COOLING SYS. RHX COOLDOWN RECIRC., OUTLET &BYPASS FLOW    220401  05      05 CONTROL VALVES, FLOW FOR SI &RHRP DISCHARGE PRESS.,
FUNCTIONAL DIAG., CONTROLS N210    AUX. COOLING SYS. NO. 11, 21, 12 &22 CC SURGE TANK LEVEL,      220402  06      06 HX FLOW &DISCHARGE TEMP. &RCPS CCW FLOW &TEMP.,
FUNCTIONAL DIAG., CONTROLS N100    eves CHG. PPS TC &AUX. OIL PRESS., CHG. FLOW, PRESS. &LINE    220403  05      05
* PRESS. CONT.; VCT PRESS. &LEVEL CONT., FUNCTIONAL DIAG.,
CONTROLS N100    eves B.A. FLOW &PRIMARY WATER FLOW CONTROL &BORIC ACID        220404  05      05 BATCHING TANK TEMP. &LEVEL, FUNCTIONAL DIAG., CONTROLS N100    eves NO. 11, 21, 12 &22 BA TK. TEMP. LVL. &RECIRC. FLOW        220405  05      05 CONTR. &RAPID BOR. FLOW, FUNCTIONAL DIAG., CONTROLS N100    eves LETDOWN HX OUTLET TEMP., LETDOWN LINE PRESS. &FLOW,      220406  07      07 FUNCTIONAL DIAG., CONTROLS N100    eves EXCESS LETDOWN PRESS., FLOW CONTROL &HX OUTLET TEMP.,    220407  04      04 FUNCTIONAL DIAG., CONTROLS N100    eves NO. 11 &21 RCP SEAL INPUT &OUTPUT TEMP.  & WTR. DELTA    220408  04      04 P, SEAL LEAK-OFF FLOW &THERM. BARRIER DELTA P, FUNCTIONAL DIAG., CONTROLS N100    eves NO. 12 &22 RCP SEAL INPUT &OUTPUT TEMP. &WTR. DELTA      220409  04      04 P, SEAL LEAK-OFF FLOW &THERM. BARRIER DELTA P, FUNCTIONAL DIAG., CONTROLS N100    eves NO. 13 &23 RCP SEAL INPUT &OUTPUT TEMP. &WTR. DELTA      220410  04      04 P, SEAL LEAK-OFF FLOW &THERM. BARRIER DELTA P, FUNCTIONAL DIAG., CONTROLS
* N100    eves NO. 14 &24 RCP SEAL INPUT &OUTPUT TEMP. &WTR. DELTA P SEAL LEAK-OFF FLOW &THERM. BARRIER DELTA P, FUNCTIONAL DIAG., CONTROLS 220411  04      04
 
                ---------                      --
Page No. 55 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                            DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
R200    REAC. COOLANT SYS. REACTOR VESSEL FLANGE LEAK-OFF                220H2  05      05 TEMPERATURE &NO. 11, 21, 12 &22 RC LOOPS LOW FLOW, FUNCTIONAL DIAG., CONTROLS R200    REAC. COOLANT SYS. NO. 13, 23, 14 &24 REAC. CLT. LOOPS LOW      220413  14      a FLOW &REAC. COOLANT PRESS., FUNCTIONAL DIAG., CONTROLS R200    REACTOR COOLANT SYS. NO. 11, 21, 12, 22, 13, 23, 14 &24 RC      2204a  12      12 LOOPS WIDE RANGE TEMP. RECORDERS, FUNCTIONAL DIAGRAM, CONTROLS R100    REACTOR COOLANT SYS. NO. 11 &21 REACTOR COOLANT LOOPS DELTA      220415  05      05 T PROTECTION SYSTEM, FUNCTIONAL DIAGRAM, CONTROLS RlOO    REACTOR COOLANT SYS. NO. 12 &22 REACTOR COOLANT LOOPS DELTA      220U6  05      05 T PROTECTION SYSTEM, FUNCTIONAL DIAGRAM, CONTROLS
* RlOO    REACTOR COOLANT SYS. NO. 13 &23 REACTOR COOLANT LOOPS DELTA      220417  05      05 T PROTECTION SYSTEM, FUNCTIONAL DIAGRAM, CONTROLS R100    REACTOR COOLANT SYS. NO. 14 &24 REACTOR COOLANT LOOPS DELTA      220H8  05      05 T PROTECTION SYSTEM, FUNCTIONAL DIAGRAM, CONTROLS R100    REACTOR COOLANT SYS. DELTA T AUCTION &DELTA T DEV.,              220419  06      06 FUNCTIONAL DIAG., CONTROLS RlOO    REACTOR COOLANT SYS. ROD INSERTION LIMIT, FUNCTIONAL DIAG.,      220420  05      05 CONTROLS RlOO    REACTOR COOLANT SYS. DELTA T SETPTS. IND. &RECORDING,            220421  05      05 FUNCTIONAL DIAG., CONTROLS RlOO    REACTOR COOLANT SYS. T AUCTION INDICATION &DEVIATION,            220422  07      07 FUNCTIONAL DIAG., CONTROLS RlOO    REACTOR COOLANT SYS. T AUCTION &ROD CONTROL, FUNCTIONAL          220423  08      08 DIAG., CONTROLS R200    REACTOR COOLANT SYS. NO. 11, 21, 12 &22 REACTOR COOLANT          220424  04      04 PUMPS INSTRUMENTATION, FUNCTIONAL DIAG., CONTROLS R200    REACTOR COOLANT SYS. NO. 13, 23, 14 &24 REACTOR COOLANT          220425  04      04 PUMPS INSTRUMENTATION, FUNCTIONAL DIAG., CONTROLS
* N200    AUX. COOLING SYS. RHR &CC PPS MTR. BRG. TEMP. CCW FLOW, SUMPS LEVEL &LEAK DET., SFP LEVEL &TEMP, FUNCTIONAL DIAG.,
CONTROLS 220426  10      10
 
Page No. 56 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
R200    REAC. COOLANT SYS. T AUCTION &ROD CONTROL, SCALING DIAGRAM,    220429  01      01 CONTROLS G210    FEED &MAIN STEAM SYSTEMS NO. 11 &21 STEAM GEN. CONTROL &        220430  06      06 PROT. FLOWS &PRESS., FUNCTIONAL DIAG., CONTROLS G210    FEED &MAIN STEAM SYSTEMS NO. 11 &21 STEAM GEN. CONTROL &        220431  12      12 PROT. LVLS. &ATMOS. STM. DUMP, FUNCTIONAL DIAG., CONTROLS G210    FEED &MAIN STEAM SYSTEMS NO. 12 &22 STEAM GEN. CONTROL &        220432  06      06 PROT. FLOWS &PRESS., FUNCTIONAL DIAG., CONTROLS G210    FEED &MAIN STEAM SYSTEMS NO. 12 &22 STEAM GEN. CONTROL &        220433  11      11 PROT. LVLS. &ATMOS. STM. DUMP, FUNCTIONAL DIAG., CONTROLS G210    FEED &MAIN STEAM SYSTEMS NO. 13 &23 STEAM GEN. CONTROL &        220434  06      06 PROT. FLOWS &PRESS., FUNCTIONAL DIAG., CONTROLS
* G210 G210 FEED &MAIN STEAM SYSTEMS NO. 13 &23 STEAM GEN. CONTROL &
PROT. LVLS. &ATMOS. STM DUMP, FUNCTIONAL DIAG., CONTROLS FEED &MAIN STEAM SYSTEMS NO. 14 &24 STEAM GEN. CONTROL &
PROT. FLOWS &PRESS., FUNCTIONAL DIAG., CONTROLS 220435 220436 11 07 11 07 G210    FEED &MAIN STEAM SYSTEMS NO. 14 &24 STEAM GEN. CONTROL &        220437  11      11 PROT. LVLS. &ATMOS. STM. DUMP, FUNCTIONAL DIAG., CONTROLS G210    MAIN STEAM PUMP TO CONDENSER, FUNCTIONAL DIAG., CONTROLS        220438  05      05 FOOD    FEEDWATER SYSTEM NO. 11, 12, 21 &22 S.G. FEED PUMPS &          220439  03      03 TURBINES SPEED CONTROL, FUNCTIONAL DIAG., CONTROLS R600    REAC. COOLANT SYS. PRESS. PRESS. CONTROL &PROT., FUNCTIONAL    220440  07      07 DIAG., CONTROLS R600    REAC. COOLANT SYS. PRESS. LEVEL CONTROL &PROT., FUNCTIONAL      220441  07      07 DIAG., CONTROLS R600    REAC. COOLANT SYS. PRESS. RELIEF TANK CONTROL &PRESSURIZER      220442  04      04 TEMPERATURES, FUNCTIONAL DIAG., CONTROLS N600    SAFETY INJ. SYSTEM, NO. 11 &21 ACCUMULATOR TANKS LEVEL &        220U3  05      05 PRESSURE, FUNCTIONAL DIAG., CONTROLS
* N600    SAFETY INJ. SYSTEM, NO. 12 &22 ACCUMULATOR TANKS LEVEL &
PRESSURE, FUNCTIONAL DIAG., CONTROLS 220444  05      05
 
                                                                                                    -1 Page No. 57                                                                                        I 11/28/89
.,
SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
N600    SAFETY INJ. SYSTEM, NO. 13 &23 ACCUMULATOR TANKS LEVEL &      220H5  05      05 PRESSURE, FUNCTIONAL DIAG., CONTROLS N600    SAFETY INJ. SYSTEM, NO. 14 &24 ACCUMULATOR TANKS LEVEL &      220446  05      05 PRESSURE, FUNCTIONAL DIAG., CONTROLS N600    SAFETY INJ. SYSTEM, ACCUM. VENT CONTR. RWST LEVEL &S.I.        220H7  11      11 PUMP DISCH. PRESS. &FLOW, FUNCTIONAL DIAG., CONTROLS N600    SAFETY INJ. SYSTEM, INJ. LINE FLOW &BORON INJ. TANK TEMP. &    220448  07      07 DISCH. PRESS., FUNCTIONAL DIAG., CONTROLS N600    CONT. SPRAY SYSTEM CONTAINMENT PRESSURE, FUNCTIONAL DIAG.,    220449  04      04 CONTROLS N600    CONT. SPRAY SYSTEM SPRAY ADDITIVE TANK LEVEL &SPRAY            220450  06      06 ADDITIVE TANK OUTLET FLOW, FUNCTIONAL DIAG., CONTROLS
* R400 R400 NUC. INSTR. SYSTEM, SOURCE RANGE NO. 1-N31, FUNCTIONAL DIAG., CONTROLS NUC. INSTR. SYSTEM, SOURCE RANGE NO. 2-N32, FUNCTIONAL DIAG., CONTROLS 220451 220452 05 05 05 05 R400    NUC. INSTR. SYSTEM, INTERMEDIATE RANGE NO. 1-N35, FUNCTIONAL  220453  05      05 DIAG., CONTROLS R400    NUC. INSTR. SYSTEM, INTERMEDIATE RANGE NO. 2-N36, FUNCTIONAL  220454  05      05 DIAG., CONTROLS R400    NUC. INSTR. SYSTEM, POWER RANGE NO. 1-N41, FUNCTIONAL DIAG.,  220455  08      08 CONTROLS R400    NUC. INSTR. SYSTEM, POWER RANGE NO. 2-N42, FUNCTIONAL DIAG.,  220456  08      08 CONTROLS R400    NUC. INSTR. SYSTEM, POWER RANGE NO. 3-N43, FUNCTIONAL DIAG.,  220457  08      08 CONTROLS R400    NUC. INSTR. SYSTEM, POWER RANGE NO. 4-N44, FUNCTIONAL DIAG.,  220458  08      08 CONTROLS R400    NUC. INSTR. SYSTEM, POWER RANGE FLUX DEVIATION PWR. MISMATCH  220459  06      06
* R400
            &ROD STOP BY-PASS, FUNCTIONAL DIAG., CONTROLS NUC. INSTR. SYSTEM, START-UP RATE, AUTDIO COUNT RATE &
COMPARATOR, FUNCTIONAL DIAG., CONTROLS 220460  03      03
 
                                            ----~~-
Page No. 58 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
M%0      CONTAINMENT VENT. NO. 11, 21, 12 &22 FAN-COIL UNITS WATER      220461  04      04 FLOW CONTROL, FUNCTIONAL DIAG., CONTROLS M940    CONTAINMENT VENT. NO. 13, 23, 14 &24 FAN-COIL UNITS WATER      220462  04      04 FLOW CONTROL, FUNCTIONAL DIAG., CONTROLS t1940    CONTAINMENT VENT. NO. 15 &25 FAN-COIL UNITS, WATER FLOW        220463  04      04 CONTROL, FUNCTIONAL DIAG., CONTROLS E220    NO. 2 AUXILIARY BUILDING CONTROL AREA NO. 2A 125 V.D.C. BUS    220800  06      06 E220    NO. 2 AUXILIARY BUILDING CONTROL AREA NO. 2B 125 V.D.C. BUS    220801  07      07 E220    NO. 2 AUXILIARY BUILDING CONTROL AREA NO. 2C 125 V.D.C. BUS    220839  09      09 M600    NO. 2 UNIT SERVICE WATER INTAKE 2C 230V VITAL BUS, TIE VALVE    220900  07      07 NO. 22SW17, SCHEMATIC, CONTROLS
* M600 M600 NO. 2 UNIT SERVICE WATER INTAKE 2C 230V VITAL BUS, ISOLATION VALVE NO. 24SW20, SCHEMATIC, CONTROLS NO. 2 UNIT SERVICE WATER INTAKE 2C 230V VITAL BUS, ISOLATION VALVE NO. 23SW20, SCHEMATIC, CONTROLS 220901 220902 07 11 07 11 M600    NO. 2 UNIT SERVICE WATER INTAKE 2B 230V VITAL BUS, ISOLATION    220903  11      11 VALVE NO. 2SW26 SCHEMATIC, CONTROLS M600    NO. 2 UNIT SERVICE WATER INTAKE 2A 230V VITAL BUS, ISOLATION    220904  07      07 VALVE NO. 22SW20 SCHEMATIC, CONTROLS M600    NO. 2 UNIT SERVICE WATER INTAKE 2A 230V VITAL BUS, TIE VALVE    220905  07      07 NO. 21SW17, SCHEMATIC, CONTROLS M600    NO. 2 UNIT SERVICE WATER INTAKE 2A 230V VITAL BUS, ISOLATION    220906  a        H VALVE NO. 21SW20, SCHEMATIC, CONTROLS N400    REAC. CONTAINMENT SAMPLE ISOLATION VALVES, SCHEMATIC,          220923  17      17 CONTROLS N400    PENETRATION AREA SAMPLE ISOLATION VALVES, SCHEMATIC, SHEET      220924  16      16 1, CONTROLS N400    PENETRATION AREA SAMPLE ISOLATION VALVES, SCHEMATIC, SHEET      220925  13      13
* N210 2, CONTROLS AUX. BLDG.-SERVICE WATER SYS NO. 11,21,22 C.C. HEAT EXCHANGE INLET CONTROL VALVES, SCHEMATIC, CONTROLS 220942  15      15
 
                                                                                  ---------------------
Page No. 59 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING  REVISION 11/01/89
  ------  ============================================================    -------  ======== ========
M600    NO. 1 &2 AUXILIARY BUILDING SERVICE WATER SYSTEM NO. 11,        220943  07      07 1221 AND 22 CHARGING PUMP LUBE OIL COOLER INLET CONTROL VALVES M600    NO. 1 &2 AUXILIARY BUILDING SERVICE WATER SYSTEM NO. 11,        220944  05      05 1221 AND 22 SAFETY INJECTION LUBE OIL COOLER INLET CONTROL VALVES M600    NO. 2 UNIT SERVICE WATER INTAKE NO. 21&22 SERV. WTR. VENT.      22090    11      11 FAN &MISC. DAMPER CONTROLS, SCHEMATIC, CONTROLS M600    NO. 2 UNIT SERVICE WATER INTAKE NO. 23&24 SERV. WTR. VENT.      220948  11      11 FAN &MISC. DAMPER CONTROLS, SCHEMATIC, CONTROLS M700    REAC. CONTAINMENT REACTOR &CONTAINMENT SUMP PUMPS,              220972  11      11 SCHEMATIC, CONTROLS
* M600    NO. 2 UNIT PENETRATION AREA SERVICE WATER SYSTEM STOP VALVE    220984  06      06 NO. 21SW22, SCHEMATIC, CONTROLS M600    NO. 2 UNIT AUXILIARY BUILDING SERVICE WATER SYSTEM STOP        220985  07      07 VALVE NO. 21SW21, SCHEMATIC, CONTROLS M600    NO. 2 UNIT PENETRATION AREA SERVICE WATER SYSTEM TIE VALVE      220986  07      07 NO. 21SW23, SCHEMATIC, CONTROLS M600    NO. 2 UNIT PENETRATION AREA SERVICE WATER SYSTEM TIE VALVE      220987  08      08 NO. 22SW23, SCHEMATIC, CONTROLS M600    NO. 2 UNIT PENETRATION AREA SERVICE WATER SYSTEM STOP VALVE    220988  07      07 NO. 22SW22, SCHEMATIC, CONTROLS M600    NO. 2 UNIT AUXILIARY BUILDING SERVICE WATER SYSTEM STOP        220989  07      07 VALVE NO. 22SW21, SCHEMATIC, CONTROLS R100    REAC. PROT. SYSTEM INDEX &SYMBOLS, LOGIC DIAG., SHEET 1,        221050  04      04 CONTROLS R100    REAC. PROT. SYSTEM, REACTOR TRIP SIGNALS, LOGIC DIAGRAM,        221051  08      08 SHEET 2, CONTROLS R100    REAC. PROT. SYSTEM, NUCLEAR INSTR. TRIP SIGNALS &MANUAL        221052  05      05 TRIP, LOGIC DIAG., SHEET 3, CONTROLS
* R100    REAC. PROT. SYSTEM, NUCLEAR INSTR. PERMS. &BLOCKS, LOGIC DIAG., SHEET 4, CONTROLS 221053  05      05
 
Page No. 60 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
R100    REAC. PROT. SYSTEM, PRIM. COOLANT SYS. TRIP SIGNALS, LOGIC      221054  05      05 DIAG., SHEET 5, CONTROLS RlOO    REAC. PROT. SYSTEM, PRESSURIZER TRIP SIGNALS, LOGIC DIAG.,      221055  07      07 SHEET 6, CONTROLS RlOO    REAC. PROT. SYSTEM, STEAM GENERATOR TRIP SIGNALS, LOGIC        221056  04      04 DIAG., SHEET 7, CONTROLS RlOO    REAC. PROT. SYSTEM, SAFEGUARDS ACTUATION SIGNALS, LOGIC        221057  12      12 DIAG., SHEET 8, CONTROLS RlOO    REAC. PROT. SYSTEM, ROD CONTROL &ROD BLOCKS, LOGIC DIAG.,      221058  04      04 SHEET 9, CONTROLS RlOO    REAC. PROT. SYSTEM, STEAM DUMP CONTROL, LOGIC DIAG., SHEET      221059  06      06 10, CONTROLS
* RlOO RlOO REAC. PROT. SYSTEM, PRESS. PRESSURE &LEVEL CONTROL, LOGIC DIAG., SHEET 11, CONTROLS REAC. PROT. SYSTEM, PRESSURIZER HEATER CONTROL, LOGIC DIAG.,
SHEET 12, CONTROLS 221060 221061 06 04 06 04 RlOO    REAC. PROT. SYSTEM, F.W. CONTROL &ISOLATION LOGIC, LOGIC        221062  04      04 DIAG., SHEET 13, CONTROLS RlOO    REAC. PROT. SYSTEM, F.W. CONTROL &ISOLATION LOGIC, LOGIC        221063  04      04 DIAG., SHEET 14, CONTROLS R100    REAC. PROT. SYSTEM,AUXILIARY F.W. PUMPS START-UP, LOGIC        221064  05      05 DIAG., SHEET 15, CONTROLS RlOO    NO. 1 REACTOR PROTECTION SYSTEM TURBINE TRIP, RUNBACKS &        221065  07      07 GENERATOR PROTECTION M600    NO. 2 UNIT-2A SERVICE WATER INTAKE 230V. VITAL CONTROL          222475  11      11 CENTER, ONE LINE DIAGRAM MK. NO. I-2101, ELECTRICAL M600    NO. 2 UNIT-2B1 SERVICE WATER INTAKE 230V. VITAL CONTROL        222476  05      05 CENTER, ONE LINE DIAGRAM MK. NO. I-2102, ELECTRICAL M600    NO. 2 UNIT-2B2 SERVICE WATER INTAKE 230V. VITAL CONTROL        222477  07      07
* M600 CENTER, ONE LINE DIAGRAM MK. NO. I-2126, ELECTRICAL NO. 2 UNIT-2C SERVICE WATER INTAKE 230V. VITAL CONTROL CENTER, ONE LINE DIAGRAM MK. NO. I-2103, ELECTRICAL 222478  12      12
 
Page No. 61 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
          ============================================================            ======== ========
E140    NO. 2 UNIT, NO. 2 SERVICE WATER INTAKE 460-230V. CONTROL        22209  13      13 CENTER, ONE LINE DIAGRAM MK. NO. I-2134, ELECTRICAL NO. 2 UNIT, AUXILIARY BUILDING 2A DIESEL 230V. VITAL CONTROL    222480  10      10 CENTER, ONE LINE DIAGRAM, MK. NO. I-2104, ELECTRICAL NO. 2 UNIT, AUXILIARY BUILDING 2B DIESEL 230V. VITAL CONTROL    222481  10      10 CENTER, ONE LINE DIAGRAM, MK. NO. I-2105, ELECTRICAL NO. 2 UNIT, AUXILIARY BUILDING 2C DIESEL 230V. VITAL CONTROL    222482  08      08 CENTER, ONE LINE DIAGRAM, MK. NO. I-2106, ELECTRICAL NO. 2 UNIT, AUXILIARY BUILDING 2A WEST VALVES &MISC. 230V.      222483  21      21 VITAL CONTROL CENTER, ONE LINE DIAGRAM, MK. NO. I-2136, ELECTRICAL NO. 2 UNIT, AUXILIARY BUILDING 2B WEST VALVES &MISC. 230V.      222484  18      18
* VITAL CONTROL CENTER, ONE LINE DIAGRAM, MK. NO. I-2109, ELECTRICAL NO. 2 UNIT, AUXILIARY BUILDING 2C WEST VALVES &MISC. 230V.      222485  22      22 VITAL CONTROL CENTER, ONE LINE DIAGRAM, MK. NO. I-2110, ELECTRICAL E140    NO. 2 UNIT, CONDENSATE POLISHING BLDG. 460-230V CONTROL        222486  06      06 CENTER ONE LINE DIAGRAM, MK. NO. I-2146, ELECTRICAL NO. 2 UNIT, AUXILIARY BUILDING 2A AIR COND. 230V. VITAL        222487  07      07 CONTROL CENTER, ONE LINE DIAGRAM, MK. NO. I-2112, ELECTRICAL NO. 2 UNIT, AUXILIARY BUILDING 2B AIR COND. 230V. VITAL        222488  08      08 CONTROL CENTER, ONE LINE DIAGRAM, MK. NO. I-2118, ELECTRICAL E140    NO. 2 UNIT, N0.2E1 AUX. BUILDING 460-230V CONTROL              222489  11      11 CENTER-460V., SECTION ONE-LINE, DIAGRAM MK. NO. I-2118, ELECTRICAL E140    NO. 2 UNIT, N0.2E1 AUX. BUILDING 460-230V CONTROL CENTER        222490  13      13 230V., SECTION ONE-LINE, DIAGRAM MK. NO. I-2118, ELECTRICAL E140    NO. 2 UNIT, N0.2E2 AUX. BUILDING 460-230V CONTROL CENTER        222491  10      10 ONE-LINE, DIAGRAM MK. NO. I-2119, ELECTRICAL
* E140    NO. 2 UNIT, N0.2G1 AUX. BUILDING 460-230V CONTROL CENTER        222492  09      09 460V., SECTION ONE-LINE, DIAGRAM MK. NO. I-2120, ELECTRICAL
 
Page No. 62 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
E150    NO. 2 UNIT, N0.2G1 AUX. BUILDING 460-230V CONTROL CENTER        222493  24      24 230V SECT. ONE-LINE, DIAGRAM MK. NO. I-2120, ELECTRICAL E140    NO. 2 UNIT, N0.2G2 AUX. BUILDING 460-230V CONTROL CENTER        222494  13      13 ONE-LINE, DIAGRAM MK. NO. I-2121, ELECTRICAL E150    NO. 2 UNIT TURB GEN AREA NO. 21 EAST 230V CONTROL CENTER        222496  19      19 ONE-LINE, DIAGRAM MK. NO. I-2116, ELECTRICAL E150    NO. 2 UNIT TURB GEN AREA NO. 22 EAST 230V CONTROL CENTER        222497  07      07 ONE-LINE, DIAGRAM MK. NO. I-2138, ELECTRICAL E150    NO. 2 UNIT TURB GEN AREA NO. 21 WEST 230V CONTROL CENTER        222498  19      19 ONE-LINE, DIAGRAM MK. NO. I-2117, ELECTRICAL E150    NO. 2 UNIT TURB GEN AREA NO. 22 WEST 230V CONTROL CENTER        222499  08      08 ONE-LINE, DIAGRAM MK. NO. 1-2139, ELECTRICAL
* E150 E150 NO. 2 UNIT TURB GEN AREA 2H HTG. &VENT 230V CONTROL CTR.
ONE-LINE, DIAGRAM MK. NO. I-2113, ELECTRICAL NO. 2 UNIT TURB GEN AREA 2F HTG. &VENT 230V CONTROL CTR.
ONE-LINE, DIAGRAM MK. NO. I-2114, ELECTRICAL 222500 222501 09 11 09 11 E150    NO. 2 UNIT TURB GEN AREA N0.2 GENERATOR 230V CONTROL CTR.      222502  08      08 ONE-LINE, DIAGRAM MK. NO. I-2115, ELECTRICAL NO. 2 UNIT PENETRATION AREA 2A EAST VALVES &MISC. 230V.        222505  16      16 VITAL CONTROL CENTER ONE LINE DIAGRAM MK. NO. I-2107, ELECTRICAL NO. 2 UNIT PENETRATION AREA 28 EAST VALVES &MISC. 230V.        222506  15      15 VITAL CONTROL CENTER ONE LINE DIAGRAM MK. NO. I-2137, ELECTRICAL NO. 2 UNIT PENETRATION AREA 2C EAST VALVES &MISC. 230V.        222507  15      15 VITAL CONTROL CENTER ONE LINE DIAGRAM MK. NO. I-2108, ELECTRICAL NO. 2 UNIT PENETRATION AREA 2A VENT. 230V. VITAL CONTROL        222508  11      11 CENTER ONE LINE DIAGRAM MK. NO. I-2131, ELECTRICAL NO. 2 UNIT PENETRATION AREA 28 VENT. 230V. VITAL CONTROL        222509  11      11
* CENTER ONE LINE DIAGRAM MK. NO. I-2132, ELECTRICAL NO. 2 UNIT PENETRATION AREA 2C VENT. 230V. VITAL CONTROL CENTER ONE LINE DIAGRAM MK. NO. I-2133, ELECTRICAL 222510  09      09
 
                        ----~
Page No. 63 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
E140    NO. 2 UNIT REACTOR CONTAINMENT 460V. CONTROL CENTER            222514  08      08 ONE-LINE, DIAGRAM MK. NO. I-2124, ELECTRICAL 11200    NO. 1&2 UNITS-FIRE PROTECTION CONTAINMENT ISOLATION VALVES    222692  09      09 1FP147 &2FP147, SCHEMATIC, CONTROLS R500    RELAY ROOM ROD CONTROL SYSTEM LOGIC CABINET CONTROL &          223163  03      03 SHUTDOWN IN-OUT RELAYS, SCHEMATIC, SHEET 1, CONTROLS E300    NO. 1A &2A DIESEL GENERATORS CONSOLE CONTROL, SCHEMATIC,      223675  03      03 SHEET 1, CONTROLS E300    NO. 1A &2A DIESEL GENERATORS CONSOLE CONTROL, SCHEMATIC,      223676  06      06 SHEET 2, CONTROLS E300    NO. 1A &2A DIESEL GENERATORS CONSOLE CONTROL, SCHEMATIC,      2236 77 13      13 SHEET 3, CONTROLS
* E300 E300 E300 NO. 1A &2A DIESEL GENERATORS ENGINE-GENERATOR CONTROL, SCHEMATIC, CONTROLS NO. 1A &2A DIESEL GENS.-ALARMS, SCHEMATIC SHEET 2, CONTROLS NO. lA &2A DIESEL GENS. UNIT TRIP &BKR. FAILURE PROT.,
223678 223679 223680 21 11 18 21 11 18 SCHEMATIC, CONTROLS E300    NO. 1B &2B DIESEL GENS. CONSOLE CONTROLS, SCHEMATIC SHEET      223681  03      03 1, CONTROLS E300    NO. 1B &2B GENERATORS CONSOLE CONTROL, SCHEMATIC SHEET 2,      223682  07      07 CONTROLS E300    NO. 1B &2B GENERATORS CONSOLE CONTROL, SCHEMATIC SHEET 3,      223683  13      13 CONTROLS E300    NO. 1B &2B DIESEL GENERATORS ENGINE-GENERATOR CONTROL,        223684  19      19 SCHEMATIC, CONTROLS E300    NO. 1B &2B DIESEL GENERATORS ALARMS, SCHEMATIC SHEET 2,        223685  11      11 CONTROLS E300    NO. lB &2B DIESEL GENERATORS UNIT TRIP &BKR. FAILURE          223686  18      18 PROT., SCHEMATIC, CONTROLS
* E300    NO. lC &2C DIESEL GENERATORS CONSOLE CONTROL, SCHEMATIC SHEET 1, CONTROLS 223687  03      03
 
                                                                                  ------------------
Page No. 64 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING  REVISION 11/01/89
  ------  ============================================================  -------  ======== ========
E300    NO. lC &2C DIESEL GENERATORS CONSOLE CONTROL, SCHEMATIC        223688  07      07 SHEET 2, CONTROLS E300    NO. 1C &2C DIESEL GENERATORS CONSOLE CONTROL, SCHEMATIC        223689  13      13 SHEET 3, CONTROLS E300    NO. 1C &2C DIESEL GENERATORS ENGINE-GENERATOR CONTROL,        223690  21      21 SCHEMATIC, CONTROLS E300    NO. 1C &2C DIESEL GENS.-ALARMS, SCHEMATIC SHEET 2, CONTROLS    223691  12      12 E300    NO. 1C &2C DIESEL GENS. UNIT TRIP &BKR. FAILURE PROT.,        223692  18      18 SCHEMATIC, CONTROLS E300    NO. 1A &2A DIESEL GENS. ALARMS, SCHEMATIC, CONTROLS            223693  18      18 E300    NO. 1B &28 DIESEL GENS. ALARMS, SCHEMATIC SHEET 1, CONTROLS    223694  15      15
* E300 E220 E300 NO. 1C &2C DIESEL GENS. ALARMS, SCHEMATIC SHEET 1, CONTROLS NO. 2 UNIT 125V D.C. ONE-LINE, DIAGRAM, ELECTRICAL NO. 1A &2A DIESEL GENS. 230V VITAL CONTROL CENTER, SCHEMATIC, CONTROLS 223695 223720 223825 16 09 13 16 09 13 E300    NO. 1A &2A DIESEL GENS. 230V VITAL CONTROL CENTER,            223826  10      10 SCHEMATIC, CONTROLS E300    NO. 1A &2A DIESEL GENS. 230V VITAL CONTROL CENTER,            223827  19      19 SCHEMATIC, CONTROLS E300    NO. lB & 28 DIESEL GENS. 230V VITAL CONTROL CENTER,            223828  12      12 SCHEMATIC SHEET 1, CONTROLS E300    NO. 18 &2B DIESEL GENS. 230V VITAL CONTROL CENTER,            223829  08      08 SCHEMATIC SHEET 2, CONTROLS E300    NO. 18 & 2B DIESEL GENS. 230V VITAL CONTROL CENTER,            223830  17      17 SCHEMATIC, CONTROLS E300    NO. lC &2C DIESEL GENS. 230V VITAL CONTROL CENTER,            223831  11      11 SCHEMATIC SHEET 1, CONTROLS
* E300    NO. lC &2C DIESEL GENS. 230V VITAL CONTROL CENTER, SCHEMATIC SHEET 2, CONTROLS 223832  08      08
 
                                                                                    - - --  ~-  - - - ------- - - - ----1 Page No. 65 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION    LOAD SYSTEM  TITLE                                                            DRAWING    REVISION    11/01/89
  ------  ============================================================      -------    ========    ========
E300    NO. 1C &2C DIESEL GENS. 230V VITAL CONTROL CENTER,                223833      17          17 SCHEMATIC SHEET 3, CONTROLS R120    REAC. PROT. SYSTEM, HIGH STEAM LINE FLOW INTERLOCKS, LOGIC      ' 224300      02          02 DIAG., SHEET 17, CONTROLS N600    SAFETY INJ. SYSTEM NO.                                            224382      07          07 1SJ163,2SJ163,13SJ162,23SJ162,14SJ162&24SJ162 TEST LINE VALVES, SCHEMATIC, CONTROLS M921    NO. 2 UNIT AIR CONDITIONING SYSTEM CONTROL ROOM INTAKE DUCT      224383      03          03 ISOL. TRAIN 'A' &TRAIN 'B', SCHEMATIC, CONTROLS N210    NO. 1 &2 UNITS-COMPONENT COOLING SYS. NO. 1CC215 &2CC15          224384      08          08 EXCESS LETDOWN HX CW INLET ISOLATION VALVES, SCHEMATIC, CONTROLS
* NlOO    ACS-RCS-CVCS-SWS-CWS-MISC. SYS., INDEX &SYMBOLS, LOGIC            224386      05          05 DIAGRAM, CONTROLS N220    R.H.R. SYSTEM, NO. 11 &21 R.H.R. PUMPS, LOGIC DIAGRAM,            224387      03          03 CONTROLS N220    R.H.R. SYSTEM, NO. 12 &22 R.H.R. PUMPS, LOGIC DIAGRAM,            224388      04          04 CONTROLS N220    R.H.R. SYSTEM, NO. 11SJ44, 21SJ44, 11RH4, 21RH4, 1RH2 &2RH2      224389      05          05 SUCTION !SOL. VALVES, LOGIC DIAGRAM, CONTROLS N220    R.H.R. SYSTEM, NO. 12SJ44, 22SJ44, 12RH4, 22RH4, 1RH1 &2RH1      224390      05          05 SUCTION ISOL. VALVES, LOGIC DIAGRAM, CONTROLS N220    R.H.R. SYSTEM, NO. 1SJ69, 2SJ69 RWST TO RHRP'S SUCT. VAS &        224391      05          05 NO. 1RH20 &2RH20 RHX BYPASS CONTROL VALVES, LOGIC DIAGRAM, CONTROLS N220    R.H.R. SYSTEM, NO. 11SJ49, 21SJ49, 11RH18, 21RH18, 11RH19 &      224392      04          04 21RH19 COOLDOWN CONTR. VA., LOGIC DIAGRAM, CONTROLS N220    R.H. R. SYSTEM, NO. 12SJ49, 22SJ49, 12RH18, 22RH18, 12RH19 &      224393      04          04 22RH19 COOLDOWN CONTR. VA., LOGIC DIAGRAM, CONTROLS N220    R.H.R. SYSTEM, NO. 1RH26 &2RH26 HOT LEG ISOL. VA., LOGIC          2243%      04          04
* N220 DIAGRAM, CONTROLS R.H.R. SYSTEM, NO. 11RH29 &21RH29 RHRP'S BYPASS VA. &CONT.
SUMP LVL. IND. LT-938, LOGIC DIAGRAM, CONTROLS 224395      08          08
 
------------
Page No. 66 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
    ------  ============================================================  ------- ======== ========
N220    R.H.R. SYSTEM, NO. 12RH29 &22RH29 RHRP'S BYPASS VA. &CONT. 224396  08      08 SUMP LVL. IND. LT-939, LOGIC DIAGRAM, CONTROLS N210    COMP. COOLING SYS., NO. 11 &21 COMPONENT COOLING PUMPS &      224397  04      04 ALARMS, LOGIC DIAGRAM, CONTROLS N210    COMP. COOLING SYS., NO. 12 &22 COMPONENT COOLING PUMPS &      224398  05      05 ALARMS, LOGIC DIAGRAM, CONTROLS N210    COMP. COOLING SYS., NO. 13 &23 COMPONENT COOLING, PUMPS &      224399  03      03 ALARMS, LOGIC DIAGRAM, CONTROLS N210    COMP. COOLING SYS., NO. 1CC131 &2CC131 RCP THERM. BAR CW      224400  06      06 FLOW CONTR. VAS. &NO. 1CC149 &2CC149 SURGE TANK VENT.
VALVES, LOGIC DIAGRAM, CONTROLS N210    COMP. COOLING SYSTEM,NO. 1CC117, 2CC117, 1CC136 &2CC136 RCP    224401  06      06
* CCW INLET &OUTLET !SOL. VAS., LOGIC DIAGRAM, CONTROLS N210    COMPONENT COOLING SYS., NO. 1CC118, 2CC118, 1CC187 &2CC187    224402  06      06 RCP CCW IN. & OUT. 1CC113 &2CC113 EL HX CCW OUT. VALVES, LOGIC DIAGRAM, CONTROLS N210    COMP. COOLING SYS., NO. 1CC215, 2CC215, ELHX CCW INLET !SOL. 224403  05      05 VAS. NO. 11 &21 RHX CW DISCH. !SOL. VAS. 11CC16 &21CC16, LOGIC DIAGRAM, CONTROLS N210    COMP. COOLING SYS. NO. 1 &2 UNITS COMP. COOLING SYS., NO.      224404  07      07 1CC190, 2CC190 RCP THERM. BAR ISOL. VAS. NO. 11 &22 RHX CW DISCH ISOL. VAS. 12CC16 &22CC16, LOGIC DIAGRAM, CONTROLS R200    REAC. COOLANT. SYSTEM, NO. 11 &21 REACTOR COOLANT PUMPS &      224405  02      02 NO. 11 &21 RCP OIL LIFT PUMPS, LOGIC DIAGRAM, CONTROLS R200    REAC. COOLANT. SYSTEM, NO. 12 &22 REACTOR COOLANT PUMPS &      224406  02      02 NO. 12 &22 RCP OIL LIFT PUMPS, LOGIC DIAGRAM, CONTROLS R200    REAC. COOLANT. SYSTEM, NO. 13 &23 REACTOR COOLANT PUMPS &      224407  02      02 NO. 13 &23 RCP OIL LIFT PUMPS, LOGIC DIAGRAM, CONTROLS R200    REAC. COOLANT. SYSTEM, NO. 14 &24 REACTOR COOLANT PUMPS &      224408  02      02 NO. 14 &24 RCP OIL LIFT PUMPS, LOGIC DIAGRAM, CONTROLS
* R200    REAC. COOLANT SYSTEM, NO. 1RC4 &2RC4 RV FLANGE LEAK-OFF VA. &REAC. COOLANT TEMP. ALARMS, LOGIC DIAGRAM, CONTROLS 224409  02      02
 
Page No. 67 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
          ============================================================            ======== ========
R200    RCS &eves, NO. 11WR62, 21WR62, 11CV104 &21CV104 VAS. &NO.      224410  03      03 11 &21 RCP ALARMS, LOGIC DIAGRAM, CONTROLS R200    RCS &eves, NO. 12WR62, 22WR62, 12CV104 &22CV104 VAS. &NO.      224411  03      03 12 &22 RCP ALARMS, LOGIC DIAGRAM, CONTROLS R200    RCS &eves, NO. 13WR62, 23WR62, 13CV104 &23CV104 VAS. &NO.      224412  03      03 13 &23 RCP ALARMS, LOGIC DIAGRAM, CONTROLS R200    RCS &eves, NO. 14WR62, 24WR62, 14CV104 &24CV104 VAS. &NO.      22H13  03      03 14 &24 RCP ALARMS, LOGIC DIAGRAM, CONTROLS NlOO    NO. 1 &2 eve SYSTEM NO. 11 &12 CHARGING PUMPS &NO. 11 &        224414  04      04 12 CHARING PUMP AUXILIARY LUBE OIL PUMPS NlOO    NO. 1 &2 eve SYSTEM NO. 12 &22 CHARGING PUMPS &NO. 12 &        224415  04      04 22 CHARGING PUMP AUXILIARY LUBE OIL PUMPS
* NlOO    eve SYSTEM, NO. 13 &23 CHARGING PUMPS, LOGIC DIAGRAM,          224416  03      03 CONTROLS NlOO    eve SYSTEM, NO. 1CV55 &2CV55 CHG. FLOW, 1CV171 &2CV171          224417  04      04 CHARGING PRESS. VALVES &CHARGING FLOW DEMAND, LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM, NO. 1CV77 &2CV77 CHG. !SOL. VAS. &NO. 1CV114 &      224418  03      03 2CV114 RCPS SEAL BYPASS FLOW VALVES, LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM, .NO. 1CV140, 2CV140, 1CV69, 2CV69, 1CV79 &2CV79    224419  07      07 CHG. DISCH. ISOL. VA LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM, NO. 1CV139, 2CV139, 1CV68 &2CV68 CHG. DISCH.        224420  07      07 ISOL. VA, LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM, NO. 12SJ45 &22SJ45 CHG. SUCTION &NO. 1CV75 &        224421  03      03 2CV75 RCS SP. ISOL. VA., LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM, NO. 1CV40 &2CV40 VCT FIRST DISCH. STOP VALVES &    224422  05      05 VCT LEVEL, INTERLOCKS &ALARM, LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM, NO. 1CV41 &2CV41 VCT SEC. DISCH. STOP VALVES &      224423  05      05 NO. 1CV243 &2CV243 VCT DEGASSING VALVES, LOGIC DIAGRAM, CONTROLS
* NlOO    eve SYSTEM, NO. 1SJ1 &2SJ1 CHG. PUMP SUCTION &1CV116 &          224424  05      05 2CV116 SEAL WATER TO VCT ISOLATION VALVES, LOGIC DIAGRAM, CONTROLS
 
                                                                                                    -
Page No. 68 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
N100    eve SYSTEM, NO. 1SJ2 &2SJ2 CHG. PUMP SUCTION &1CV284 &        22H25  05      05 2CV284 SEAL WATER TO VCT ISOLATION VALVES, LOGIC DIAGRAM, CONTROLS N100    eve SYSTEM, NO. 1CV35 &2CV35 VOLUME CONTROL TANK LEVEL        224426  03      03 CONTROL VALVES, LOGIC DIAGRAM, CONTROLS
  *N100    eve SYSTEM, NO. 1CV2, 2CV2, 1CV277 &2CV277 RCS LETDOWN LINE    224427  03      03 ISOLATION VALVES, LOGIC DIAGRAM, CONTROLS N100    eve SYSTEM, NO. 1CV8, 2CV8, 1CV18, 2CV18, 1CC71 &2CC71        224428  03      03 LETDOWN FLOW, PRESS. &TEMP. CONTROL VALVES, LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM, NO. 1CV3 &2CV3 LETDOWN ORIFICE &NO. 1CV7 &        22U29  03      03 2CV7 LETDOWN CONTR. VAS., LOGIC DIAGRAM, CONTROLS
* NlOO    eve SYSTEM, NO. 1CV4 &2CV4 LETDOWN ORIFICE ISOLATION          224430  03      03 VALVES, LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM, NO. 1CV5 &2CV5 LETDOWN ORIFICE ISOLATION          22U31  03      03 VALVES, LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM, NO. 1eV134, 2CV134, 1CV278, 2CV278, 1CV131,        22H32  03      03 2CV131, 1CV132 &2CV132 EXC. LETDOWN VALVES, LOGIC DIAGRAM, CONTROLS N100    eve SYSTEM, NO. 11CV160 &21CV160 B.A. TANK RECIRC. VALVES &    224433  03      03 NO. 11 &21 BORIC ACID TANK HEATERS, LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM, NO. 12CV160 &22CV160 B.A. TANK RECIRC. VALVES &    22H34  03      03 NO. 12 &22 BORIC ACID TANK HEATERS, LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM, NO. 11 &12 B.A. TRANSFER PUMPS, LOGIC DIAGRAM,    224435  03      03 CONTROLS NlOO    eve SYSTEM, NO. 12 &22 B.A. TRANSFER PUMPS, LOGIC DIAGRAM,    224436  03      03 CONTROLS NlOO    eve SYSTEM, NO. 11 &21 PRIM. WTR. MAKEUP PUMP, LOGIC          22H37  03      03 DIAGRAM, CONTROLS N100    eve SYSTEM, NO. 12 &22 PRIMARY WATER MAKEUP PUMPS &NO. 1 &  22H38  03      03
* 2 PRIMARY WATER TANK HEATING CIRCULATORS, LOGIC DIAGRAM, CONTROLS
 
                                                              -------~-
Page No. 69 11/28/89 SALEM SIMULA TOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING  REVISION 11/01/89
  ------  ============================================================  -------  ======== ========
NlOO    eve SYSTEM, BORIC ACID BLEND M/U MODE SEL., LOGIC DIAG.,      224439  03      03 SHEET 1, CONTROLS NlOO    eve SYSTEM, BORIC ACID BLEND M/U MODE SEL.' LOGIC DIAG.,      224440  03      03 SHEET 2, CONTROLS NlOO    eve SYSTEM, NO. 1CV185, 2CV185, 1CV181 & 2CV181,  MAKE-UP      224441  03      03 STOP VALVES, LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM, NO. 1CV172, 2CV172, BORIC ACID FLOW CONTROL        224442  '03      03 VALVES, LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM, NO. 1CV179, 2CV179, PRIMARY WATER CONTROL          224443  03      03 VALVES, LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM. NO. 1CV21 & 2CV21 TEMP. CONTROL FLOW VALVES TO    224444  05      05 DM. &NO. 1CV27 &2CV27 DM. &NO. 1CV27 &2CV27 DM. DIVERT.
* VALVES, LOGIC DIAGRAM, CONTROLS NlOO    eve SYSTEM, NO. 1HS67 &2HS67 B.A. BATCHING STEAM INLET        224445  04      04 VALVES &1CV175 &2CV175 RAPID BORATE STOP VALVES, LOGIC DIAGRAM, CONTROLS N210    NO. 2 UNIT COMPONENT COOLING SYSTEM NO. 21 RHRHX CCW OUTLET    224455  04      04 ALARMS, SCHEMATIC, CONTROLS N210    NO. 1&2 UNITS COMPONENT COOING SYSTEM NO. 12 &22 RHRHX CCW    224456  06      06 OUTLET ALARMS, SCHEMATIC, CONTROLS E130                                                                    224630 F310                                                                    224803  05      05 F310                                                                    224805  04      04 F310                                                                    224806  04      04 F310                                                                    224807  04      04 R500    NO. 1 &2 UNITS CONTROL ROOM AREA ROD CONTROL SYSTEM ROD        226062 POSITION INDICATION, SCHEMATIC, SHEET 1, CONTROLS R500    NO. 1 &2 UNITS CONTROL ROOM AREA ROD CONTROL SYSTEM ROD        226063  01      01
* R500 POSITION INDICATION, SCHEMATIC, SHEET 2, CONTROLS NO. 1 &2 UNITS CONTROL ROOM AREA ROD CONTROL SYSTEM ROD POSITION INDICATION, SCHEMATIC, SHEET 3, CONTROLS 226064  02      02
 
                                                                                  -----------------
Page No. 70 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING    REVISION  11/01/89
          ============================================================    -------    ======== ========
R500    NO. 1 &2 UNITS CONTROL ROOM AREA ROD CONTROL SYSTEM ROD        226065    02      02 POSITION INDICATION, SCHEMATIC, SHEET 4, CONTROLS R500    NO. 1 &2 UNITS CONTROL ROOM AREA ROD CONTROL SYSTEM ROD        226066    01      01 POSITION INDICATION, SCHEMATIC, SHEET 5, CONTROLS R500    NO. 1 &2 UNITS CONTROL ROOM AREA ROD CONTROL SYSTEM ROD        226067    04      04 POSITION INDICATION, SCHEMATIC, SHEET 6, CONTROLS C900    NO. 1 &2 UNITS RAD. MON. SYSTEM NO. 12 &22 CONT. SAMPLE        226503    08      08 VENT &OUTLET ISOLATION VALVES, SCHEMATIC, CONTROLS E300    NO. 1 &2 UNITS DIESEL GENERATORS VOLTAGE REG. &EXCITER          226631    04      04 CONTROL, SCHEMATIC, CONTROLS E300    NO. 1 &2 UNITS DIESEL GENERATORS PROTECTION AND CONTROL,        226632    06        06 A.C. SCHEMATIC SHEET 1, CONTROLS
* E300 E300 NO. 2 UNIT DIESEL GENERATOR PROTECTION AND CONTROL, A.C.
SCHEMATIC SHEET 2, CONTROLS NO. 1&2 UNITS DIESEL GENERATORS INSTRUMENTS &METERS, A.C.
SCHEMATIC, CONTROLS 226633 226634 07 04 07 04 E300    DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM,        226635    07        07 SHEET-1, CONTROLS E300    DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM,        226636    05        05 SHEET-2, CONTROLS E300    DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM,        226637    07        07 SHEET-3, CONTROLS E300    DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM,        226638    08        08 SHEET-4, CONTROLS E300    DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM,        226639    07        07 SHEET-5, CONTROLS E300    DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM,        226640    06        06 SHEET-6, CONTROLS E300    DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM,        226641    04        04
* E300 SHEET-7, CONTROLS DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM, SHEET-8, CONTROLS 226642    07        07
 
                                              -----------------                    ----------------------
Page No. 71 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING    REVISION 11/01/89
  ------  ============================================================    -------    ======== ========
E300    DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM,        226643    10      10 SHEET-9, CONTROLS E300    DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM,        226644    04      04 SHEET-10, CONTROLS E300    DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM,        226645    03      03 SHEET-11, CONTROLS E300    DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM,        226646    03      03 SHEET-12, CONTROLS E300    DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM,        226647    03      03 SHEET-13, CONTROLS E300    DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM,        226648    03      03 SHEET-14, CONTROLS
* E300 R120 DIESEL ENGINE &GENERATOR CONTROL SYSTEM, LOGIC DIAGRAM, SHEET-15, CONTROLS NO. 1&2 UNITS CONTROL ROOM AREA SOLID STATE REACTOR PROTECTION SYSTEM TRAIN A INTERFACE CAB. 32, SCHEMATIC, SHEET 1, CONTROLS 2266/i 9 227975 03 11 03 11 R120    NO. 1&2 UNITS CONTROL ROOM AREA SOLID STATE REACTOR            227976    09      09 PROTECTION SYSTEM TRAIN A INTERFACE CAB. 32, SCHEMATIC, SHEET 2, CONTROLS R120    NO. 1&2 UNITS CONTROL ROOM AREA SOLID STATE REACTOR            227977    09      09 PROTECTION SYSTEM TRAIN A INTERFACE CAB. 32, SCHEMATIC, SHEET 3, CONTROLS R120    NO. 1&2 UNITS CONTROL ROOM AREA SOLID STATE REACTOR            227978    06      06 PROTECTION SYSTEM TRAIN B INTERFACE CAB. 38, SCHEMATIC, SHEET 1, CONTROLS R120    NO. 1&2 UNITS CONTROL ROOM AREA SOLID STATE REACTOR            227979    08      08 PROTECTION SYSTEM TRAIN B INTERFACE CAB. 38, SCHEMATIC, SHEET 2, CONTROLS R120    NO. 1&2 .UNITS CONTROL ROOM AREA SOLID STATE REACTOR            227980    OB      08 PROTECTION SYSTEM TRAIN B INTERFACE CAB. 38, SCHEMATIC,
* M921 SHEET 3, CONTROLS NO. 1 &2 UNITS CONTROL AREA A.C. CHILLER MOTORS, SCHEMATIC, CONTROLS 228030    05      05
 
~--
Page No. 72 11/28/89 SALEM SIMULATOR Simulator Design Database
* SYSTEM
    ------
TITLE Sorted by Drawing Number
            ============================================================
DRAWING
                                                                            -------
STATION REVISION
                                                                                    ========
TRAINING LOAD 11/01/89
                                                                                              ========
M921    NO. 1 &2 UNITS CONTROL AREA A.G. CHILLED WATER PUMPS,          228031  11      11 SCHEMATIC, CONTROLS M921    NO. 1 &2 CONTROL AREA A.C. CHILLED WATER ISOLATION VALVES      228033  09      09 X243    NO. 2 UNIT CONTROL CONSOLE BEZEL RESIDUAL HEAT REMOVAL          228475  11      11 PRESSURIZER RELIEF TANK, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL NO. 21 STEAM GENERATOR,        228476  09      09 STEAM GEN.-LEVEL &FLOW RECORDER, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL COND.-COMPONENT COOLING        228477  10      10 WATER, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL NO. 21 STEAM GENERATOR        228478  06      06 FEEDPUMP &TURBINE HEATER DRAIN PUMPS, FRONT VIEW, CONTROLS
* X243    NO. 2 UNIT CONTROL CONSOLE BEZEL NO. 22 STEAM GENERATOR        22809  07      07 FEEDPUMP &TURBINE EXCITATION, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL STEAM GENERATOR FEED PUMPS    228480  07      07
            &SAMPLING SYS. TURBINE GEN. AUXS., FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL REHEAT STEAM TEMP.-MAIN        228481  07      07 STEAM, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL SHUT-DOWN PART LENGTH &        228482  03      03 CONTROL ROD COUNTERS, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL FEEDWATER HEATERS              228483  07      07 COMPRESSED AIR, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL CIRCULATING WATER              228484  10      10 CONDENSER, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL NO. 21 REACTOR COOLANT        228485  07      07 PUMP, R.C. PUMP SEAL LEAK-OFF FLOW, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL PRESSURIZER LEVEL &            228486  13      13 TEMPERATURE REACTOR COOLANT PRESSURE, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL NO. 22 REACTOR COOLANT PUMP    228487  06      06 CONT. ROD GR.-POS. &INS. LIMITS, FRONT VIEW, CONTROLS
* X243    NO. 2 UNIT CONTROL CONSOLE BEZEL BORIC ACID &PRIMARY WATER FLOW REGISTERS REACTOR COOLANT SYSTEM, FRONT VIEW, CONTROLS 228488  04      04
 
                                          --                    -------  --*
Page No. 73 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                            DRAWING REVISION 11/01/89
  ------  ============================================================      ------- ======== ========
X243    NO. 2 UNIT CONTROL CONSOLE BEZEL CHARGING SYSTEM, NO. 23          228489  07      07 REACTOR COOLANT PUMP, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL REACTOR COOLANT                  228490  08      08 TEMPERATURES ROD CONTROL, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL SERVICE WATER TURBINE            228491  05      05 AUXILIARY COOLING WATER, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL NO. 21 &22 ACCUMULATOR,          228492  07      07 NO. 2A DIESEL GENERATOR, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL SAFETY INJECTION, FRONT          228493  09      09 vmJ, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL NO. 22 STEAM GENERATOR, NO.      228494  10      10 24 STEAM GENERATOR, FRONT VIEW, CONTROLS
* X243 X243 NO. 2 UNIT CONTROL CONSOLE BEZEL CONT. SPRAY CRT PANEL ASSEMBLY, FRONT VIEW, CONTROLS NO. 2 UNIT CONTROL CONSOLE BEZEL CONT. VENTILATION &
RECORDERS, FRONT VIEW, CONTROLS 228495 228496 05 07 05 07 X243    NO. 2 UNIT CONTROL CONSOLE BEZEL VENTILATION - AUXILIARY          228497  08      08 BUILDING FUEL -NPLG. BLDG. &CONTAINMENT, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL 4KV-2H &2E, 2F &2G GROUP        228499  07      07 BUS, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL 13 &500KV GROUP BUS              228500  05      05 VOLTMETERS, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL VOLTMETERS, GENERATOR &          228501  08      08 VITAL BUS 2A, 2B, 2C-SYNCHROSCOPE, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL ROD POSITION, FRONT VIEW,        228502  06      06 CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL NO. 23 STM. GEN. &REAC.          228503  09      09 LEVEL MONITOR, FRONT VIEW, CONTROLS
* X243    NO. 2 UNIT CONTROL CONSOLE BEZEL NUCLEAR INSTRUMENTATION, POWER RANGE RECORDERS, FRONT VIEW, CONTROLS 228504  06      06
 
Page No. 74 11/28/89 SALEM SIMULA TOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
X243    NO. 2 UNIT CONTROL CONSOLE BEZEL AUXILIARY FEED PUMPS AUX. 228505  10      10 FEED, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL CHEMICAL &VOLUME CONTROL,    228506  07      07 FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL NO. 24 REACTOR COOLANT        228507  06      06 PUMP, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL SAFEGUARDS ACT. &CONT.        228508  05      05 PRESSURE PRIM. WTR. &BORIC ACID FLOW REC., FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL STEAM GEN. SLOWDOWN MAIN      228509  10      10 STEAM, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL NO. 2B &2C DIESEL            228510  07      07
* GENERATORS, NO. 23 &24 ACCUMULATOR, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL CHEM. &VOL. CONTROL WASTE    228511  09      09 DISP., FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL NUCLEAR POWER RANGE          228512  02      02 RECORDER, FRONT VIEW, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL E.H. OPERATOR'S PANEL,        228513  03      03 FRONT VIEW, SHEET 1, CONTROLS X243    NO. 2 UNIT CONTROL CONSOLE BEZEL E.H. OPERATOR'S PANEL,        228514  03      03 FRONT VIEW, SHEET 2, CONTROLS M600    SERV. WATER SYSTEM INTAKE ISOL. VA 1SW26 PEN. A. TIE VALVES    231040  05      05 11SW23 &12SW23, LOGIC DIAGRAM, CONTROLS M600    SERV. WATER INTAKE !SOL. VALVE 11SW20 &12SW20 TIE VALVE        23104.1 04      04 11SW17 LOGIC DIAGRAM, CONTROLS M600    SERV. WATER INTAKE !SOL. VALVE 13SW20 &14SW20 TIE VALVE        231042  04      04 12SW17, LOGIC DIAGRAM, CONTROLS T800    CIRCULATING WATER INTAKE NO. 11A-13A TRAVELING SCREENS,        231043  09      09 LOGIC DIAGRAM, CONTROLS
* T800    CIRCULATING WATER INTAKE NO. 11B-13B TRAVELING SCREENS, LOGIC DIAGRAM, CONTROLS 231044  08      08
 
                                                                                            ----      - -
Page No. 75 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION  11/01/89
  ------  ============================================================    ------- ========  ========
M600    SERV. WATER SYSTEM, AUX. BLDG. STOP VALVES 11SW21 &12SW21      231045  03        03 PENETRATION AREA STOP VALVES 11SW22 &12SW22, LOGIC DIAGRAM, CONTROLS M600    SERV. WATER TURB. AREA TURB. AUX. COOL. HX. VALVES 11ST58 &    231046  03        03 12ST58 SERVICE WATER HEADER TROUBLE ALARM, LOGIC DIAGRAM, CONTROLS M600    SERV. WATER INTAKE TRAVELING SCREEN WASH &NO. 11 &12            231047  05        05 DISCH. HEADER PRESS. TRANSMS., LOGIC DIAGRAM, CONTROLS M600    SERV. WATER INTAKE NO. 15 &21 SERVICE WATER PUMPS, LOGIC        231050  04        04 DIAGRAM, CONTROLS M600    SERV. WATER INTAKE NO. 13 &23 SERVICE WATER PUMPS, LOGIC        231051  03        03 DIAGRAM, CONTROLS
* M600    SERV. WATER INTAKE NO. 11 &25 SERVICE WATER PUMPS, LOGIC        231052  04        04 DIAGRAM, CONTROLS M600    SERV. WATER INTAKE NO. 16 &22 SERVICE WATER PUMPS, LOGIC        231053  03        03 DIAGRAM, CONTROLS M600    SERV. WATER INTAKE NO. 14 &24 SERVICE WATER PUMPS, LOGIC        231054  04        04 DIAGRAM, CONTROLS M600    SERV. WATER INTAKE NO. 12 &26 SERVICE WATER PUMPS, LOGIC        231055  03        03 DIAGRAM, CONTROLS M600    SERV. WATER SYSTEM AUX. BLDG. NO. 11, 21 &22 COMP. CLG.        231056  03        03 HEAT EXCHANGER CONTROL VALVES, LOGIC DIAGRAM, CONTROLS T800    CIRC. WATER INTAKE BY-PASS VALVES 11CW9 &11CW109, LOGIC        231063  02        02 DIAGRAM, CONTROLS T800    CIRC. WATER INTAKE BY-PASS VALVES 12CW9 &12CW109, LOGIC        231064  02        02 DIAGRAM, CONTROLS T800    CIRC. WATER INTAKE BY-PASS VALVES 13CW9 &13CW109, LOGIC        231065  02        02 DIAGRAM, CONTROLS T800    CIRC. WATER SYSTEM T.G.A. NO. 11A &116 CIRCULATOR              231066  02        02 CONDENSEROUTLET VALVE, LOGIC DIAGRAM, CONTROLS
* T800    CIRC. WATER SYSTEM T.G.A. NO. 12A &126 CIRCULATOR CONDENSER OUTLET VALVE, LOGIC DIAGRAM, CONTROLS 231067  02        02
 
Page No. 76 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
T800    CIRC. WATER SYSTEM T.G.A. NO. 13A &138 CIRCULATOR CONDENSER    231068  02      02 OUTLET VALVE, LOGIC DIAGRAM, CONTROLS TBOO    CIRC. WATER INTAKE NO. 11A CIRCULATOR VACUUM 8RKER. &          231069  02      02 CONDENSER VALVES LOGIC DIAGRAM, CONTROLS T800    CIRC. WATER INTAKE NO. 118 CIRCULATOR VACUUM 8RKER. &          231070  02      02 CONDENSER VALVES LOGIC DIAGRAM, CONTROLS T800    CIRC. WATER INTAKE NO. 12A CIRCULATOR VACUUM 8RKER. &          231071  01      01 CONDENSER VALVES, LOGIC DIAGRAM, CONTROLS T800    CIRC. WATER INTAKE NO. 128 CIRCULATOR VACUUM 8RKR. &            231072  02      02 CONDENSER VALVES, LOGIC DIAGRAM, CONTROLS T800    CIRC. WATER INTAKE NO. 13A CIRCULATOR VACUUM 8RKER. &          231073  02      02 CONDENSER VALVES, LOGIC DIAGRAM, CONTROLS
* T800 T800 CIRC. WATER INTAKE N0.138 CIRCULATOR VACUUM 8RKER. &
CONDENSER VALVES, LOGIC DIAGRAM, CONTROLS CIRC. WATER INTAKE NO. 11A CIRCULATOR, LOGIC DIAGRAM, CONTROLS 231074 231076 02 05 02 05 T800    CIRC. WATER INTAKE NO. 12A CIRCULATOR, LOGIC DIAGRAM,          231077  05      05 CONTROLS TBOO    CIRC. WATER INTAKE NO. 13A CIRCULATOR, LOGIC DIAGRAM,          231078  05      05 CONTROLS T800    CIRC. WATER INTAKE NO. 118 CIRCULATOR, LOGIC DIAGRAM,          231079  05      05 CONTROLS T800    CIRC. WATER INTAKE NO. 128 CIRCULATOR, LOGIC DIAGRAM,          231080  05      05 CONTROLS TBOO    CIRC. WATER INTAKE NO. 138 CIRCULATOR, LOGIC DIAGRAM,          231081  05      05 CONTROLS T800    CIRC. WATER INTAKE NO. 12 &22 SCREEN WASH PUMPS, LOGIC          231083 DIAGRAM, CONTROLS T800    CIRC. WATER INTAKE NO. 14 &24 SCREEN WASH PUMPS, LOGIC          231085
* R600 DIAGRAM, CONTROLS PRESSURIZER 1WR80, 2WR80, 1NT25 &2NT25 PRESS. RELIEF TANK &
N2 TO PRESSURIZER RELIEF TANK ISOLATION VALVES, LOGIC DIAGRAM, CONTROLS 231350  02      02
 
Page No. 77 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
          ============================================================          ======== ========
R600    PRESSURIZER 1WR82, 2WR82, 1PR14 &2PR14 PRESS. RELIEF TANK      231351  04      04 SPRAY &DRAIN VALVES, LOGIC DIAGRAM, CONTROLS R600    PRESSURIZER 1PR15 &2PR15 RELIEF TANK VENT ALARMS, LOGIC        231354  03      03 DIAGRAM, CONTROLS R600    PRESSURIZER 1PR18, 2PR18, 1PR17 &2PR17 PRESS. RELIEF TANK      231355  04      04 TO GAS ANALYZER CONT. ISOLATION VALVES, LOGIC DIAGRAM, CONTROLS R600    PRESSURIZER 1PR6, 2PR6, 1PR7 &2PR7 PRESSURIZER RELIEF STOP    231356  04      04 VALVES, LOGIC DIAGRAM, CONTROLS R600    PRESSURIZER lPRl, 2PR1, 1PR2 &2PR2 PRESSURIZER POWER RELIEF    231357  09      09 VALVES, LOGIC DIAGRAM, CONTROLS R600    PRESSURIZER PRZ. PRESS. CONTROL &1PS1, 2PS1, 1PS3 &2PS3        231359  02      02
* SPRAY CONTROL VALVES LOGIC DIAGRAM, CONTROLS M940    CONTAINMENT VENT. NO. 11 &21 FAN-COIL UNITS, FAN CONTROL,      231375  05      05 LOGIC DIAGRAM, CONTROLS M940    CONTAINMENT VENT. NO. 11 &21 FAN-COIL UNITS, DAMPERS &        231376  09      09 WATER VALVES CONTROL, LOGIC DIAGRAM, CONTROLS M%.O    CONTAINMENT VENT. NO. 12 &22 FAN-COIL UNITS, FAN CONTROL,      231377  05      05 LOGIC DIAGRAM, CONTROLS M940    CONTAINMENT VENT. NO. 12 &22 FAN-COIL UNITS,DAMPERS &WATER    231378  08      08 VALVES CONTROL, LOGIC DIAGRAM, CONTROLS M940    CONTAINMENT VENT. NO. 13 &23 FAN-COIL UNITS, FAN CONTROL,      231379  05      05 LOGIC DIAGRAM, CONTROLS M940    CONTAINMENT VENT. NO. 13 &23 FAN-COIL UNITS, DAMPERS &        231380  08      08 WATER VALVES CONTROL, LOGIC DIAGRAM, CONTROLS M940    CONTAINMENT VENT. NO. 14 &24 FAN-COIL UNITS, FAN CONTROL,      231381  05      05 LOGIC DIAGRAM, CONTROLS M940    CONTAINMENT VENT. NO. 14 &24 FAN-COIL UNITS, DAMPERS &        231382  08      08 WATER VALVES CONTROL, LOGIC DIAGRAM, CONTROLS
* M940    CONTAINMENT VENT. NO. 15 &25 FAN-COIL UNITS, FAN CONTROL, LOGIC DIAGRAM, CONTROLS 231383  05      05
 
Page No. 78 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
M940    CONTAINMENT VENT. NO. 15 &25 FAN-COIL UNITS, DAMPERS &          231384  08      08 WATER VALVES CONTROL, LOGIC DIAGRAM, CONTROLS M940    CONTAINMENT VENT. NO. 11, 21, 12 &22 IODINE REM. UNITS,        231385  02      02 LOGIC DIAGRAM, CONTROLS M940    UNITS- CONTAINMENT VENT. NO. 11, 21, 12 &22 CONTROL ROD        231386  02      02 DRIVE VENT FANS, LOGIC DIAGRAM, CONTROLS M940    CONTAINMENT VENT. NO. 13, 23, 14 &24 CONTROL ROD DRIVE VENT    231387  02      02 FANS, LOGIC DIAGRAM, CONTROLS M940    CONTAINMENT VENT. NO. 11, 21, 12 &22 REACTOR SHIELD VENT        231388  02      02 FANS, LOGIC DIAGRAM, CONTROLS M940    CONTAINMENT VENT. NO. 11, 21, 12 &22 REACTOR NOZZLE SUPPORT    231389  02      02 VENT FANS, LOGIC DIAGRAM, CONTROLS
* M%0 M940 CONTAINMENT VENT. NO. 13, 23, 14 &24 REACTOR NOZZLE SUPPORT VENT FANS, LOGIC DIAGRAM, CONTROLS CONTAINMENT VENT. NO. 1VC1, 2VC1, 1VC4, 2VC4, 1VC2, 2VC2, 1VC3 &2VC3 PURGE AIR OUTLET &INLET ISOLATION VALVES, LOGIC DIAGRAM, CONTROLS 231390 231391 02 04 02 04 M%0      CONTAINMENT VENT. NO. 1VC5, 2VC5, 1VC6, 2VC6 PRESS. VACUUM      231392  04      04 RELIEF ISOL. VALVES &RELIEF FILTER UNIT DAMPERS, LOGIC DIAGRAM, CONTROLS M910    AUX. BLDG. VENT. NO. 11, 21, 12, 22, 13 &23 EXHAUST HEPA        231393  02      02 FILTER UNITS MODE SELECTION, LOGIC DIAGRAM, SHEET 1, CONTROLS M910    AUX. BLDG. VENT. NO. 11, 21, 12, 22, 13 &23 EXHAUST HEPA        231394  04      04 FILTER UNITS MODE SELECTION, LOGIC DIAGRAM, SHEET 2, CONTROLS M910    AUX. BLDG. VENT. NO. 11, 21, 12 &22 EXHAUST FANS, LOGIC        231395  02      02 DIAGRAM, CONTROLS M910    AUX. BLDG. VENT. NO. 13 &23 EXHAUST FANS &HEPA FILTERS          231396  02      02 BACKDRAFT DAMPERS, LOGIC DIAGRAM, CONTROLS
* M910    AUX. BLDG. VENT. NO. 11, 21, 12 &22 SUPPLY UNITS, LOGIC DIAGRAM, CONTROLS 231397  02      02
 
Page No. 79 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
G210    NO. 1 &2 UNITS MAIN STEAM NO. 11-14, 21-24 STOP VALVES        231414  07      07 HYDRAULIC PUMP CONTROL, A.G. SCHEMATIC, CONTROLS G220    NO. 1 &2 UNITS MAIN STEAM SYSTEM NO. 11, 12 &13 E. &W.M        231419  04      04 STEAM COIL DRAIN TANKS LEVEL TRANSMS., SCHEMATIC, CONTROLS M921    CONTROL AREA A.C. AIR CONDITIONING MODE SELECTION, LOGIC      231421  06      06 DIAG., SHEET 1, CONTROLS M921    CONTROL AREA A.C. AIR CONDITIONING MODE SELECTION, LOGIC      231422  05      05 DIAG., SHEET 2, CONTROLS M921    CONTROL AREA A.C. NO. 11-13, 21-23 CONTROL ROOM AIR            231423  02      02 CONDITIIONING FANS, LOGIC DIAGRAM, CONTROLS M921    CONTROL AREA A.C. NO. 11, 21, 12 &22 EMERGENCY SUPPLY FANS    231425  04      04
          &BATTERY RMS. EXHAUST FANS, LOGIC DIAGRAM, CONTROLS
* M910 M910 AUX. BLDG. VENT. NO. 11, 21, 12, 22, 13 &23 SWITCHGEAR ROOM SUPPLY FANS, LOGIC DIAGRAM, CONTROLS AUX. BLDG. VENT. SWGR. ROOM &PEN. AREA EXH. FANS, LOGIC DIAGRAM, CONTROLS 231426 231427 02 02 02 02 F700    MAIN FEEDWATER PUMPS &TURBINES NO. 11A, 11B, 21A &21B OIL      231430  02      02 PUMPS, LOGIC DIAGRAM, CONTROLS F700    MAIN FEEDWATER PUMPS &TURBINES NO. 11 &21 EMERGENCY OIL        231431  02      02 PUMPS, OIL SEP. PUMP &MISC. OIL ALARMS, LOGIC DIAGRAM, CONTROLS F700    MAIN FEEDWATER PUMPS &TURBINES NO. 11 &21 SG FP TURBINE        231432  02      02 TURNING GEAR MOTOR, LOGIC DIAGRAM, CONTROLS F700    MAIN FEEDWATER PUMPS &TURBINES NO. 12A, 12B, 22A &22B OIL      231433  02      02 PUMPS, LOGIC DIAGRAM, CONTROLS F700    MAIN FEEDWATER PUMPS &TURBINES NO. 12 &22 EMERGENCY OIL        231434  02      02 PUMPS OIL SEP. PUMP &MISC. OIL ALARMS, LOGIC DIAGRAM, CONTROLS F700    MAIN FEEDWATER PUMPS &TURBINES NO. 12 &22 SG FP TURBINE        231435  02      02 TURNING GEAR MOTOR, LOGIC DIAGRAM, CONTROLS
* F700    NO. 1 &2 MAIN FEEDWATER PUMPS AND TURBINES NO. 11 &12 SGFP
          &TURBINE OIL VAPOR EXTRACTOR, AND NO. 11TD24,26,33, AND 21TD24,24, TURBINE DRAIN VALVES 231436  04      04
 
Page No. 80 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/ 89
  ------  ============================================================    ------- ======== ========
F700    MAIN FEEDWATER PUMPS &TURBINES NO. 11CN32 &21CN32 SG FP        231437  02      02 SUCTION VAS. &NO. 11CN36 &22CN36 SG FP WARM-UP VALVES, LOGIC DIAGRAM, CONTROLS F700    MAIN FEEDWATER PUMPS &TURBINES NO. 11CN48 &21CN48 SG FP        231438  02      02 BY-PASS VAS. &NO. 11BF32 &21BF32 SG FP RECIRC. VALVES LOGIC DIAGRAM, CONTROLS F700    MAIN FEEDWATER PUMPS &TURBINES NO. 11 &21 SG FP &TURBINE        231439  04      04 RESET AND LP &HP STEAM STOP VALVES TEST, LOGIC DIAGRAM, CONTROLS F700    MAIN FEEDWATER PUMPS &TURBINES NO. 21 SG FEED PUMP &            231440  11      11 TURBINE TRIP, LOGIC DIAGRAM, SHEET 2, CONTROLS F700    MAIN FEEDWATER PUMPS &TURBINES NO. 12CN32 &22CN32 SG FP        231442  02      02 SUCTION VAS. &NO. 12CN36 &22CN36 SG FP WARM-UP VALVES,
* LOGIC DIAGRAM, CONTROLS F700    MAIN FEEDWATER PUMPS &TURBINES NO. 12CN48 &22CN48 SG FP        231443  02      02 BY-PASS VAS. &NO. 12BF32 &22BF32 SG FP RECIRC. VALVES, LOGIC DIAGRAM, CONTROLS F700    MAIN FEEDWATER PUMPS &TURBINES NO. 12 &22 SG FP &TURBINE        231444  04      04 RESET AND LP &HP STEAM STOP VALVES TEST, LOGIC DIAGRAM, CONTROLS F700    MAIN FEEDWATER PUMPS &TURB*s NO. 22 SG FEED PUMP &TURBINE      231445  10      10 TRIP, LOGIC DIAGRAM, SHEET 2, CONTROLS F400    AUX. F.W. SYSTEM NO. 11 &21 AUX. FEEDWATER PUMPS, LOGIC        231446  05      05 DIAGRAM, CONTROLS F400    AUX. F.W. SYSTEM NO. 12 &22 AUX. FEEDWATER PUMPS, LOGIC        231447  05      05 DIAGRAM, CONTROLS F400    AUX. F. W. SYSTEM NO. 13 &23 AUX. FEEDWATER PUMPS, LOGIC        231448  04      04 DIAGRAM, CONTROLS F400    AUX. F.W. SYSTEM NO. 13 &23 AUX. FEEDWATER PUMPS, TURBINE      231449  02      02 SPEED CONTROL LOGIC DIAGRAM, CONTROLS M600    NO. 2 SERVICE WATER SYSTEM SERVICE WATER PUMPS                  232302  15      15
* MCOO    NO. 1 &2 CONTROL AIR HEADERS 1A &2A ISOLATION VALVES            232542  09      09
 
Page No. 81 11/28/89 SALEM SIMULA TOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION
* LOAD SYSTEM  TITLE                                                          DRAWING REVISION  11/01/89
  ------  ============================================================  ------- ========  ========
MCOO    NO. 1 &2 CONTROL AIR HEADERS 1B &2B ISOLATION VALVES          2325H  08        08 C220    NO. 1 &2 REHEAT STEAM SYSTEM INDEX AND SYMBOLS                232545  04        04 G220    REHEAT STEAM SY. TEMPERATURE CONTROL ANALOG, FUNCTIONAL        232546  01        01 DIAGRAM, CONTROLS C300    NO. 1 &2 CONTROL AREA ANNUNCIATOR SYSTEM FIRST OUT ALARMS      232978  04        04 C300    NO. 1&2 UNITS CONTROL AREA ANNUNC. SYSTEM-REFLASH ALARMS,      232979  03        03 SCHEMATIC, CONTROLS C300    NO. 1&2 UNITS CONTROL AREA ANNUC. SYSTEM-CONSOLE ALARMS,      232980  04        04 SCHEMATIC, CONTROLS C300    NO. 2 UNIT-CONTROL ROOM ANNUNCIATOR DESIGNATIONS, FRONT        233982  22        22 VIEW, CONTROLS
* C300 C300 NO. 2 UNIT-CONTROL ROOM ANNUNCIATOR DESIGNATIONS, FRONT VIEW, CONTROLS NO. 2 UNIT-CONTROL ROOM ANNUNCIATOR DESIGNATIONS, FRONT VIEW, CONTROLS 233983 233984 28 13 28 13 R130    NO. 1 &2 UNITS NO. 1A,1B &lC VITAL BUSES SAFEGUARD EQUIP.      236250  03        03 CONTROL SYSTEM, SCHEMATIC, SHEET 1, CONTROLS R130    NO. 1 &2 UNITS NO. 1A, 1B &1C VITAL BUSES SAFEGUARD EQUIP. 236251  03        03 CONTROL SYSTEM, SCHEMATIC, SHEET 2, CONTROLS R130    NO. 1 &2 UNITS NO. 1A, 1B &1C VITAL BUSES SAFEGUARD EQUIP. 236252  01        01 CONTROL SYSTEM, SCHEMATIC, SHEET 3, CONTROLS R130    NO. 1 &2 UNITS NO. 1A, 1B &lC VITAL BUSES SAFEGUARD EQUIP. 236253  04        04 CONTROL SYSTEM, SCHEMATIC, SHEET 4, CONTROLS R130    NO. 1 &2 UNITS NO. lA, lB &lC VITAL BUSES SAFEGUARD EQUIP. 236254  01        01 CONTROL SYSTEM, SCHEMATIC, SHEET 5, CONTROLS Rl30    NO. 1 &2 UNITS NO. lA, 1B &1C VITAL BUSES SAFEGUARD EQUIP. 236255  02        02 CONTROL SYSTEM, SCHEMATIC, SHEET 6, CONTROLS R130    NO. 1 &2 UNITS NO. lA, 18 &lC VITAL BUSES SAFEGUARD EQUIP. 236256  03        03
* R130 CONTROL SYSTEM, SCHEMATIC, SHEET 7, CONTROLS NO. 1 &2 UNITS NO. lA, 1B &1C VITAL BUSES SAFEGUARD EQUIP.
CONTROL SYSTEM, SCHEMATIC, SHEET 8, CONTROLS 236257  05        05
 
Page No. 82 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
R130    NO. 1 &2 UNITS NO. 1A, 1B &1C VITAL BUSES SAFEGUARD EQUIP. 236258  03      03 CONTROL SYSTEM, SCHEMATIC, SHEET 9, CONTROLS R130    NO. 1 &2 UNITS NO. 1A, 1B &1C VITAL BUSES SAFEGUARD EQUIP. 236259  05      05 CONTROL SYSTEM, SCHEMATIC, SHEET 10, CONTROLS R130    NO. 1 &2 UNITS NO. 1A, 1B & 1C VITAL BUSES SAFEGUARD EQUIP. 236260  01      01 CONTROL SYSTEM, SCHEMATIC, SHEET 11, CONTROLS R130    NO. 1 &2 UNITS NO. 1A, 1B &1C VITAL BUSES SAFEGUARD EQUIP. 236261  03      03 CONTROL SYSTEM, SCHEMATIC, SHEET 12, CONTROLS R130    NO. 1 &2 UNITS NO. 1A, 1B &1C VITAL BUSES SAFEGUARD EQUIP. 236262  04      04 CONTROL SYSTEM, SCHEMATIC, SHEET 13, CONTROLS R130    NO. 1 &2 UNITS NO. lA, lB &lC VITAL BUSES SAFEGUARD EQUIP. 236263  04      04 CONTROL SYSTEM, SCHEMATIC, SHEET 14, CONTROLS
* R130 R130 NO. 1 &2 UNITS NO. 1A, lB &1C VITAL BUSES SAFEGUARD EQUIP.
CONTROL SYSTEM, SCHEMATIC, SHEET 15, CONTROLS NO. 1 &2 UNITS NO. 1A, 1B &1C VITAL BUSES SAFEGUARD EQUIP.
CONTROL SYSTEM, SCHEMATIC, SHEET 16, CONTROLS 236264 236265 04 02 04 02 R130    NO. 1 &2 UNITS NO. lA, 1B &lC VITAL BUSES SAFEGUARD EQUIP. 236266  02      02 CONTROL SYSTEM, SCHEMATIC, SHEET 17, CONTROLS R130    NO. 1 &2 UNITS NO. lA, 1B &1C VITAL BUSES SAFEGUARD EQUIP. 236267  01      01 CONTROL SYSTEM, SCHEMATIC, SHEET 18, CONTROLS R130    NO. 1 &2 UNITS NO. 1A, 1B &1C VITAL BUSES SAFEGUARD EQUIP. 236268  01      01 CONTROL SYSTEM, SCHEMATIC, SHEET 30, CONTROLS R130    NO. 1 &2 UNITS NO. 1A, lB &1C VITAL BUSES SAFEGUARD EQUIP. 236270  02      02 CONTROL SYSTEM, SCHEMATIC, SHEET 19, CONTROLS R130    NO. 1 &2 UNITS NO. 1A, 1B &1C VITAL BUSES SAFEGUARD EQUIP. 236271  01      01 CONTROL SYSTEM, SCHEMATIC, SHEET 20, CONTROLS R130    NO. 1 &2 UNITS NO. lA, lB &1C VITAL BUSES SAFEGUARD EQUIP. 236272  01      01 CONTROL SYSTEM, SCHEMATIC, SHEET 21, CONTROLS R130    NO. 1 &2 UNITS NO. 1A, 1B &1C VITAL BUSES SAFEGUARD EQUIP. 236273  01      01
* R130 CONTROL SYSTEM, SCHEMATIC, SHEET 22, CONTROLS NO. 1 &2 UNITS NO. 1A, 1B &1C VITAL BUSES SAFEGURAD EQUIP.
CONTROL SYSTEM, SCHEMATIC, SHEET 23, CONTROLS 236274  02      02
 
-            -  -  -  - - -            --
Page No. 83 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                            DRAWING REVISION 11/01/89
    ------    ============================================================      ------- ======== ========
T200        NO. 1&2 UNITS TURBINE GLAND SEALING STEAM &LEAK-OFF ALARMS,      236371  06      06 SCHEMATIC, CONTROLS TlDD      TURBINE GENERATOR NO. 11 &21 TURB. HYDR. FLUID PUMP, LOGIC        237901  03      03 DIAGRAM, CONTROLS TlDO      TURBINE GENERATOR NO. 12 &22 TURB. HYDR. FLUID PUMP, LOGIC        237902  03      03 DIAGRAM, CONTROLS T500      TURBINE GENERATOR HIGH PRESS. SEAL OIL B/U PUMP, LOGIC            237903  03      03 DIAGRAM, CONTROLS TODD      TURBINE GENERATOR TURBINE VACUUM BREAKER VALVES, LOGIC            237904  02      02 DIAGRAM, CONTROLS T700      TURBINE GENERATOR TURBINE TURNING GEAR, LOGIC DIAGRAM,            237905  03      03 CONTROLS
* T700 T500 TURBINE GENERATOR BEARING OIL HYDRAULIC LIFT PUMP, LOGIC DIAGRAM, CONTROLS TURBINE GENERATOR TURBINE AUXILIARIES ALARMS, LOGIC DIAGRAM, CONTROLS 237906 237907 05 02 05 02 T500      TURBINE GENERATOR AUXILIARY BEARING OIL PUMP, LOGIC DIAGRAM,      237908  06      06 CONTROLS T500      TURBINE GENERATOR EMERGENCY BEARING OIL PUMP, LOGIC DIAGRAM,      237909  03      03 CONTROLS TlOO      N0.1 TURBINE GENERATOR 11E, 11W INTERCEPTOR &REHEAT STOP          237913  05      05 VALVES TEST R160      CONTROL ROOM AREA REACTOR PROTECTION SYSTEM MAN.-AUTO. 6          237920  DO      DO BUTTON CONTROLLER, SCHEMATIC, SHEET 1, CONTROLS N210      NO. 2 UNIT COMP. COOLING SYSTEM, INSTR. SCHEMATIC, CONTROLS      239084  13      13 M910      NO. 2 AUXILIARY FEEDWATER VENTILATION PUMP ROOMS VENTILATION      239091  08      08 F500      NO. 2 UNIT FEEDWATER L.P. FEEDWATER HEATERS LEVEL, INSTR.        239092  03      03 SCHEMTIC, CONTROLS
* R200 N600
              ~O. 2 UNIT REAC. COOLANT SYSTEM, INSTR. SCHEMATIC, CONTROLS NO. 2 UNIT SAFETY INJECTION SYS. NO. 21&22 SAFETY INJECTION PUMPS, INSTR. SCHEMATIC, CONTROLS 239093 239094 07 04 07 04
 
Page No. 84 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
N220    NO. 2 UNIT R.H.R. SYSTEMS, INSTR. SCHEMATIC, CONTROLS          239095  07      07 F700    NO. 2 UNIT NO. 21 S.G. FEED PUMP &TURBINE STEAM &              239096  10      10 CONDENSATE, INSTR. SCHEMATIC, CONTROLS F400    NO. 2 UNIT AUX. FEEDWATER PUMPS, INSTR. SCHEMATIC, CONTROLS    239097  19      19 F500    NO. 2 UNIT FEEDWATER HEATER BY-PASS STEAM GEN. INLET VALVE    239098  09      09 CONTROL, INSTR. SCHEMATIC, CONTROLS F500    NO. 2 UNIT FEEDWATER H.P. FEEDWATER HEATERS LEVEL, INSTR.      239099  05      05 SCHEMATIC, CONTROLS F500    FEEDWATER &MAIN STEAM SYSTEMS PROCESS ALARMS, LOGIC DIAG.,    239682  02      02 SHEET 1, CONTROLS F500    FEEDWATER &MAIN STEAM SYSTEMS PROCESS ALARMS, LOGIC DIAG.,    239683  02      02
* SHEET 2, CONTROLS F500    FEEDWATER SYSTEM NO. 11BF19 &218Fl9 SGFW CONTROL &118F40 &    239900  04      04 218F40 SGFW VALVES, LOGIC DIAGRAM, CONTROLS F500    FEEDWATER SYSTEM NO. 12BF19 &228F19 SGFW CONTROL &128F40 &    239901  04      04 22BF40 SGFW BYPASS VALVES, LOGIC DIAGRAM, CONTROLS F500    FEEDWATER SYSTEM NO. 138F19 &238F19 SGFW CONTROL &13BF40 &    239902  04      04 23BF40 SGFW BYPASS VALVES, LOGIC DIAGRAM, CONTROLS F500    FEEDWATER SYSTEM NO. 14BF19 &24BF19 SGFW CONTROL &14BF40 &    239903  04      04 24BF40 SGFW BYPASS VALVES, LOGIC DIAGRAM, CONTROLS F500    FEEDWATER SYSTEM NO. 11BF13 &21BF13 SGFW CONTROL &118F13 &    239904  04      04 21BF13 SG FW BYPASS VALVES, LOGIC DIAGRAM, CONTROLS F500    FEEDWATER SYSTEM NO. 12BF13 &22BF13 SG FW INLET STOP          239905  04      04 VALVES, LOGIC DIAGRAM, CONTROLS F500    FEEDWATER SYSTEM NO. 13BF13 &23BF13 SG FW INLET STOP          239906  04      04 VALVES, LOGIC DIAGRAM, CONTROLS F500    FEEDWATER SYSTEM NO. 14BF13 &24BF13 SG FW INLET STOP          239907  04      04 VALVES, LOGIC DIAGRAM, CONTROLS
* G210    MAIN STEAM SYSTEM NO. 11MS7 &21MS7 SG DRAIN VALVES &11MS18
          &21MS18 SG WARMUP VALVES, LOGIC DIAGRAM, CONTROLS 239908  08      08
 
                                                  ---------
Page No. 85 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
G210    MAIN STEAM SYSTEM NO. 12MS7 &22MS7 SG DRAIN VALVES &12MS18    239909  08      08
          &22MS18 SG WARMUP VALVES, LOGIC DIAGRAM, CONTROLS G210    MAIN STEAM SYSTEM NO. 13MS7 &23MS7 SG DRAIN VALVES &13MS18    239910  08      08
          &23MS18 SG WARMUP VALVES, LOGIC DIAGRAM, CONTROLS G210    MAIN STEAM SYSTEM NO. 14MS7 &24MS7 SG DRAIN VALVES &14MS18    239911  08      08
          &24MS18 SG WARMUP VALVES, LOGIC DIAGRAM, CONTROLS G210    MAIN STEAM SYSTEM NO. 11MS10 &21MS10 RELIEF VALVES &NO.        239912  02      02 11MS26, 21MS26, 12MS26, 22MS26, TURBINE DRAIN VALVES, LOGIC DIAGRAM, CONTROLS G210    MAIN STEAM SYSTEM NO. 12MS10 &22MS10 RELIEF VALVES, LOGIC      239913  02      02 DIAGRAM, CONTROLS G210    MAIN STEAM SYSTEM NO. 13MS10 &23MS10 RELIEF VALVES, LOGIC      239914  02      02
* DIAGRAM, CONTROLS G210    MAIN STEAM SYSTEM NO. 14MS10 &24MS10 RELIEF VALVES, LOGIC      239915  02      02 DIAGRAM, CONTROLS G210    MAIN STEAM SYSTEM NO. 11 &21MS169 &11 &21MS171, LOGIC          239916  03      03 DIAGRAM, CONTROLS G210    MAIN STEAM SYSTEM NO. 11MS167 &21MS167 MAIN STEAM STOP        239917  09      09 VALVES HYDRAULIC CONTROL, LOGIC DIAGRAM, CONTROLS G210    MAIN STEAM SYSTEM STOP VALVE VENT VALVES NO. 21 &22MS169 &    239918  03      03 21 &22MS171, LOGIC DIAGRAM, CONTROLS G210    MAIN STEAM SYSTEM NO. 12MS167 &22MS167 MAIN STEAM STOP        239919  09      09 VALVES HYDRAULIC CONTROL, LOGIC DIAGRAM, CONTROLS G210    MAIN STEAM SYSTEM STOP VALVE VENT VALVES NO. 13 &23MS169 &    239920  03      03 13 &23MS171, LOGIC DIAGRAM, CONTROLS G210    MAIN STEAM SYSTEM NO. 13MS167 &23MS167, STOP VALVES            239921  09      09 HYDRAULIC CONTROL, LOGIC DIAGRAM, CONTROLS G210    MAIN STEAM SYSTEM STOP VALVE VENT VALVES, NO. 14&24MS169 &    239922  02      02 14&24MS171, LOGIC DIAGRAM, CONTROLS
* G210    MAIN STEAM SYSTEM NO. 14MS167 &24MS167 STOP VALVES HYDRAULIC CONTROL, LOGIC DIAGRAM, CONTROLS 239923  09      09
 
Page No. 86 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
G210    MAIN STEAM SYSTEM NO. 11MS168 THRU 14MS168 &21MS168 THRU      239924  02      02 24MS168 SG STOP VALVE 3 POS. MAINTENANCE VALVES, LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, NO. 11 &21 SAFETY INJECTION PUMPS,        239925  02      02 LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, NO. 12 &22 SAFETY INJECTION PUMPS,        239926  02      02 LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, NO. 1SJ30, 2SJ30, 11SJ33, 21SJ33, 12SJ33  239927  02      02
          &22SJ33 SAFETY INJECTION PUMPS SUCTION VALVES, LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, NO. 11SJ113, 21SJ113, 12SJ113, 22SJ113,    239928  03      03 11SJ45 &21SJ45 SAFETY INJECTION PUMPS RECIRC. VALVES, LOGIC DIAGRAM, CONTROLS
* N600 N600 SAFETY INJ. SYSTEM, NO. 11SJ40, 21SJ40, 12SJ40 &22SJ40 S.I.P. DISCH. VALVES TO HOT LEGS, LOGIC DIAGRAM, CONTROLS SAFETY INJ. SYSTEM, NO. 11SJ134, 21SJ134, 12SJ134, 22SJ134, 1SJ135 &2SJ135    S.I.P. DISCHARGE VALVES TO COLD LEGS, LOGIC DIAGRAM, CONTROLS 239929 239930 02 02 02 02 N600    SAFETY INJ. SYSTEM, NO. 1SJ67, 2SJ67, 1SJ68, 2SJ68 MINIFLOW    239931  05      05 ISOLATION VALVES FROM SAFETY INJECTION PUMPS TO RWST, LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, S.I.P., R.H.R. &CHARGING PUMPS            239932  02      02 DISCHARGE TEST LINE VALVES, LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, SAFETY INJECTION DISCH. FROM HOT LEGS      239933  02      02 TEST LINE VALVES, LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, TEST LINE CONTROL &ISOL. VALVES, LOGIC    239934  02      02 DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, NO. 1SJ19, 2SJ19, 1NT32, 2NT32, 1NT35 &    239935  02      02 2NT35 ACCUMULATORS SUPPLY &VENT VALVES, LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, NO. 11SJ54, 21SJ54, 11SJ57, 21SJ57,        239936  02      02
* 11SJ58, 21SJ58, 11SJ27 &21SJ27 NO. 11 ACCUMULATOR OUTLET VALVES, LOGIC DIAGRAM, CONTROLS
 
Page No. 87 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
N600    SAFETY INJ. SYSTEM, NO. 12SJ54, 22SJ54, 12SJ57, 22SJ57,        239937  02      02 12SJ58, 22SJ58, 12SJ27 &22SJ27 NO. 12 ACCUMULATOR OUTLET VALVES, LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, NO. 13SJ54, 23SJ54, 13SJ57, 23SJ57,        239938  02      02 13SJ58, 23SJ58, 13SJ27 &23SJ27 NO. 13 ACCUMULATOR OUTLET VALVES, LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, NO. 14SJ54, 24SJ54, 14SJ57, 24SJ57,        239939  02      02 14SJ58, 24SJ58, 14SJ27 &24SJ27 NO. 14 ACCUMULATOR OUTLET VALVES, LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, NO. 11SJ20, 21SJ20, 11SJ93 &21SJ93 NO.      239940  02      02 11 ACCUM. INLET VA. &ALARMS, LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, NO. 12SJ20, 22SJ20, 12SJ93 &22SJ93 NO.      2399H  02      02 12 ACCUM. INLET VA. &ALARMS, LOGIC DIAGRAM, CONTROLS
* N600 N600 SAFETY INJ. SYSTEM, NO. 13SJ20, 23SJ20, 13SJ93 &23SJ93 NO.
13 ACCUM. INLET VA. &ALARMS, LOGIC DIAGRAM, CONTROLS SAFETY INJ. SYSTEM, NO. 14SJ20, 24SJ20, 14SJ93 &24SJ93 NO.
14 ACCUM. INLET VA. &ALARMS, LOGIC DIAGRAM, CONTROLS 239942 239943 02 02 02 02 N600    SAFETY INJ. SYSTEM, NO. 1SJ4, 2SJ4, 1SJ5 &2SJ5 NO. 11, 12 &    239944  04      04 13 CHG. PUMP DISCH. CONT. VA., LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, NO. 1SJ12, 2SJ12, 1SJ13 &2SJ13 BORON        239945  05      05 INJ. TANK ISOLATION VALVES, LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, NO. 1SJ78, 2SJ78, 1SJ79, 2SJ79, 1SJ108 &    239946  02      02 2SJ108 BORON INJ. TANK OUTLET &ISOL. VAS. FROM BA TANK, LOGIC DIAGRAM, CONTROLS N600    SAFETY INJ. SYSTEM, RWST HEATER PUMP &LEVEL ALARMS, LOGIC      239948  04      04 DIAGRAM, CONTROLS N620    CONT .. SPRAY SYSTEM NO. 11 &21 CONT. SPRAY PUMPS, LOGIC        239949  02      02 DIAGRAM, CONTROLS N620    CONT. SPRAY SYSTEM NO. 12 &22 CONT. SPRAY PUMPS, LOGIC          239950  02      02 DIAGRAM, CONTROLS
* N620    CONT. SPRAY SYSTEM NO. 11 &21 SPRAY CONTROL VALVES NO.
11CS2, 21CS2, 1CS16 &2CS16, LOGIC DIAGRAM, CONTROLS 239951  02      02
 
                  --~
Page No. 88 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================    ------- ======== ========
N620    CONT. SPRAY SYSTEM NO. 12 &22 SPRAY CONTROL VALVES NO.          239952  02      02 12CS2, 22CS2, 1CS17 &2CS17, LOGIC DIAGRAM, CONTROLS N620    CONT. SPRAY SYSTEM NO. 11CS36, 21CS36, 12CS36 &22CS36          239953  02      02 RECIRCULATION VALVES, LOGIC DIAGRAM, CONTROLS N620    NO. 1 &2 CONTAINMENT SPARY SYSTEM NO. 1CS14 &2CS14 SPRAY        239954  02      02 ADDITIVE TANK DISCHARGE VALVES F400    AUX. F.W. SYSTEM NO. 11, 12, 13, 21, 22 &23 AUX. F.W. PUMP      239955  04      04 ALT. SUCTION VALVES &ALARM, LOGIC DIAGRAM, CONTROLS F400    AUX. F.W. SYSTEM NO. 11, 12, 21, & 22 AUX. F.W. PUMP            239956  03      03 RECIRC. VALVES AUX. F.W. HEATER PUMP &WATER TEMP. ALARM, LOGIC DIAGRAM, CONTROLS F400    AUX. F.W. SYSTEM NO. 11-14 &21-24 S.G. AUX. F.W. INLET          239957  05      05
* VALVES &AUX. F.W. STORAGE LEVEL ALARMS, LOGIC DIAGRAM, CONTROLS F400    AUX. F.W. SYSTEM NO. 13AF21, 14AF21, 23AF21 &24AF21 S.G.        239959  05      05 INLET VALVES, LOGIC DIAGRAM, CONTROLS G216    S.G. DRAINS &BLOWDOWN SYSTEM NO. 11-14 S.G. SLOWDOWN            239960  02      02 ISOLATION VALVES, LOGIC DIAGRAM, CONTROLS G216    S.G. DRAINS &BLOWDOWN SYSTEM NO. 11&12 SLOWDOWN TANKS INLET    239961  04      04
          &FLOW VALVES, LOGIC DIAGRAM, CONTROLS 8216    S.G. DRAINS &BLOWDOWN SYSTEM NO. 11 STM. GEN. SLOWDOWN TK.      239962  02      02 TRANSFER PUMP &VA., LOGIC DIAGRAM, CONTROLS G216    S.G. DRAINS &SLOWDOWN SYSTEM SLOWDOWN FLOW TO FILTER &          239963  02      02 EQUIPMENT DRAIN VALVES, LOGIC DIAGRAM, CONTROLS 8216    S.G. DRAINS &SLOWDOWN SYS. BLOWDOWN FILTRATE VALVES &          239964  02      02 ALARMS, LOGIC DIAGRAM, CONTROLS N400    SAMPLING SYSTEM NO. 11-14 S.G. BLOWDOWN SAMPLE ISOLATION        239965  04      04 VALVES, LOGIC DIAGRAM, CONTROLS N400    SAMPLING SYSTEM PZR., REAC. COOLANT &ACCUMULATOR SAMPLE        239966  05      05 ISOL. VALVES-CONT. AREA, LOGIC DIAGRAM,CONTROLS
* N400    SAMPLING SYSTEM PZR., REAC. COOLANT &ACCUMULATOR SAMPLE ISOL. VALVES-PEN. AREA, LOGIC DIAGRAM, CONTROLS 239967  06      06
 
Page No. 89 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
          ============================================================          ======== ========
MCOO    CONTROL AIR SYSTEM NO. 1 &2 EMERG. CONTROL AIR COMPR.,        239968  04      04 LOGIC DIAGRAM, CONTROLS MCOO    CONTROL AIR SYSTEM NO. 1 &2 EMERG. CONTROL AIR COMPR.,        239969  02      02 FAILURES &AIR HDR. !SOL. VALVES, LOGIC DIAGRAM, CONTROLS MBOO    NO. 2 UNIT SERVICE AIR SYSTEM, NO. 2 STATION AIR COMPRESSOR,  239972  02      02 LOGIC DIAGRAM, CONTROLS MBOO    NO. 2 UNIT SERVICE AIR SYSTEM, NO. 2 STATION AIR COMPR.        239973  02      02 FAILURES, TROUBLES &AUXILIARY OIL PUMP, LOGIC DIAGRAM, CONTROLS MBOO    NO. 2 UNIT SERVICE AIR SYSTEM, NO. 2 STATION AIR COMPRESSOR    239977  02      02 LOADING SEQUENCE, LOGIC DIAGRAM, CONTROLS F600    HTR. DRAIN PUMPS SYSTEM NO. 11&21 HEATER DRAIN PUMPS &        239979  03      03
* RECIRCULATING VALVES, LOGIC DIAGRAM, CONTROLS F600    PRESSURIZER NO. 11, 21 B.U. GROUP HEATER, LOGic DIAGRAM,      239985  05      05 CONTROLS F600    HTR. DRAIN PUMPS SYSTEM NO. 12&22 HEATER DRAIN PUMPS &        239986  02      02 RECIRCULATING VALVES, LOGIC DIAGRAM, CONTROLS F600    HTR. DRAIN PUMPS SYSTEM NO. 13&23 HEATER DRAIN PUMPS &        239987  02      02 RECIRCULATING VALVES, LOGIC DIAGRAM, CONTROLS M924    FUEL HANDLING AREA VENT NO. 11, 21, 12 &22 EXH. FANS, LOGIC    239988  02      02 DIAGRAM, CONTROLS M924    FUEL HANDLING AREA VENT NO. 1 &2 SUPPLY UNITS &NO. 11, 21,    239989  02      02 12 &22 EXH. FANS, FILTER UNITS, LOGIC DIAGRAM, CONTROLS M921    CONTROL AREA A.C. NO. 11, 21, 12, 22, 13 &23, CHILLER          239990  02      02 MOTORS, LOGIC DIAGRAM, CONTROLS M921    CONTROL AREA A.C. CHILLED WATER ISOLATION VALVES, LOGIC        239992  02      02 DIAGRAM, CONTROLS N500    WASTE DISP. SYSTEM, RCDT PUMPS NO. 11, 12, 21 &22, LOGIC      239993  02      02 DIAGRAM, CONTROLS
* N530    WASTE DISP. SYSTEM, RCDT TO WASTE HOLDUP TANK CONTROL VALVES 1WL12 &2WL12, LOGIC DIAGRAM, CONTROLS 239994  05      05
 
                                                                                                        ---------,
Page No. 90 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
      ------  ============================================================    ------- ======== ========
N500    WASTE DISP. SYSTEM, RCDT !SOL. VAS. 1WL13 &2WL13 &CONT.        239995  02      02 SUMP PUMP DISCHARGE VALVES, LOGIC DIAGRAM, CONTROLS N500    WASTE DISP. SYSTEM LIQ. WASTE DISCH. VAS. 1WL51 &2WL51 &        239996  03      D3 RCDT TO GAS ANAL. ISOL. VALVES 1WL97 &2WL97, LOGIC DIAGRAM, CONTROLS N500    WASTE DISP. SYTEM, RCDT TO GAS ANAL. ISOL. VALVES 1WL96 &      239997  03      03 2WL96 &VENT HOR. VALVES 1WL98 &2WL98, LOGIC DIAGRAM, CONTROLS N500    WASTE DISP. SYSTEM, RCDT TO N2 MANIFOLD VAS. 1WL108 &2WL108    239998  02      02
              &TO VENT HEADER VALVES 1WL99 &2WL99, LOGIC DIAGRAM, CONTROLS N500    WASTE DISP. SYSTEM, GASEOUS WASTE DISCHARGE VALVES 1WG41 &      239999  D2      D2 2WG41 &CONTROL SUMP TO WHT ISOL. VALVES 1WL17 &2WL17,
* LOGIC DIAGRAM, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN ASOURCE RANGE TRIP LOGIC,        240101  01      01 SCHEMATIC, SHEET 2, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN A INTERMEDIATE RANGE TRIP        240102  DO      DD LOGIC, SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN APOWER RANGE TRIP LOGIC,          240103  DO      00 SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN ALOGIC TRIP PERMISSIVES,          240104  01      01 SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN APRESSURIZER PRESS. &LEVEL        240105  DD      OD TRIPS, SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN ASTEAM GEN. LOW FEED WATER        24D1D6  DD      OD FLOW, SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN ALOSS OF REACTOR COOLANT          240107  03      03 FLOW, SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN ATURBINE TRIP, SCHEMATIC,        240108  06      06 CONTROLS I
'
I
* R120    S.S. REACTOR PROTECTION TRAIN AOVERPWR. &OVERTEMP. DELTA T
              &R.C.P. U.V. TRIPS, SCHEMATIC, CONTROLS 240109  01      01 I
I L________
 
                                                                                -------------~--*-
Page No. 91 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING  REVISION 11/01/89
  ------  ============================================================  -------  ======== ========
R120    S.S. REACTOR PROTECTION TRAIN AR.C. PUMPS UNDERFREQUENCY      240110  01      01 TRIPS, SCHEMATIC, CONTROLS RlOO    S.S. REACTOR PROTECTION TRAIN AREAC. TRIP &B/P BKRS. UV        240111  03      03 OUTPUT, SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN AREAC. COOLANT LOOPS LOW        240112  00      00 TAVG, SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN ASTEAM LINE PRESSURE &FLOW,      240113  00      00 SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN ASTEAM LINE DIFFERENTIAL        240114  DO      OD PRESSURE, SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN APRESS. PRESS. &LEVEL            240115  02      02 SAFEGUARDS, SCHEMATIC, CONTROLS
* R120 R120 S.S. REACTOR PROTECTION TRAIN ASTEAM GENERATOR LOW WATER LEVEL, SCHEMATIC, CONTROLS S.S. REACTOR PROTECTION TRAIN ACONTAINMENT PRESSURE, SCHEMATIC, CONTROLS 240116 240117 00 DO 00 00 R120    S.S. REACTOR PROTECTION TRAIN ASAFEGUARDS ACTUATION,          240118  07      07 SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN ASTEAM GEN. FEEDWATER            240119  00      OD CONTROL, SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN B SOURCE RANGE TRIP LOGIC,      240137  OD      00 SCHEMATIC SHEET 1, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN B SOURCE RANGE TRIP LOGIC,      240138  DO      00 SCHEMATIC SHEET 2, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN B INTERMEDIATE RANGE TRIP        240139  DO      DO LOGIC, SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN B POWER RANGE TRIP LOGIC,        240140  DO      DO SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN B LOGIC TRIP PERMISSIVES,        240141  01      01
* R120 SCHEMATIC, CONTROLS S.S. REACTOR PROTECTION TRAIN B PRESSURIZER PRESS. &LEVEL TRIPS, SCHEMATIC, CONTROLS 240142  00      OD
 
                                              -
Page No. 92 11/28/89 SALEM SIMULA TOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
R120    S.S. REACTOR PROTECTION TRAIN B STEAM GEN. LOW FEED WATER      240143  00      DD FLOW, SCHEMATIC, CONTROLS R12D    S.S. REACTOR PROTECTION TRAIN B LOSS OF REACTOR COOLANT        2401H  04      04 FLOW, SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN B TURBINE TRIP, SCHEMATIC,      240145  03      03 CONTROLS R120    S.S. REACTOR PROTECTION TRAIN B OVERPWR. &OVERTEMP. DELTA T    240146  01      01
          &R.C.P. U.V. TRIPS, SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN B R.C. PUMPS UNDERFREQUENCY      240147  01      01 TRIPS, SCHEMATIC, CONTROLS R100    S.S. REACTOR PROTECTION TRAIN B REAC. TRIP &B/P BKRS. UV      240148  03      03 OUTPUT, SCHEMATIC, CONTROLS
* R120 R120 S.S. REACTOR PROTECTION TRAIN B REACTOR COOLANT LOOPS LOW TAVG, SCHEMATIC, CONTROLS S.S. REACTOR PROTECTION TRAIN B STEAM LINE PRESSURE &FLOW, SCHEMATIC, CONTROLS 240149 240250 OD DO DO OD R120    S.S. REACTOR PROTECTION TRAIN B STEAM LINE DIFFERENTIAL        240251  OD      DO PRESSURE, SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN B PRESS. PRESS. &LEVEL          240252  02      02 SAFEGUARDS, SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN B STEAM GENERATOR LOW WATER      240253  DO      OD LEVEL, SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN B CONTAINMENT PRESSURE,          240254  DO      00 SCHEMATIC, CONTROLS R120    S.S. REACTOR PROTECTION TRAIN B SAFEGUARDS ACTUATION,          240255  06      06 SCHEMATIC, CONTROLS Rl20    S.S. REACTOR PROTECTION TRAIN B STEAM GEN. FEEDWATER          240256  DD      DD CONTROL, SCHEMATIC, CONTROLS F700    NO. 2 UNIT NO. 21 S.G. FEED PUMP &TURBINE, INSTR.              240625  06      06
* G220 SCHEMATIC, CONTROLS NO. 2 UNIT NO. 21W, 22W &23W MSR MAIN STEAM &DRAIN CONTROL, INSTR. SCHEMATIC, CONTROLS 240627  07      07
 
                                                                                  - - ----------- -    - - - - -----i Page No. 93 11/28/89 SALEM SIMULA TOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING    REVISION 11/01/89
          ============================================================                ======== ========
F520    NO. 2 UNIT FEEDWATER 21A-22C L.P. F.W. HEATER BY-PASS,          240628      08      08 INSTR. SCHEMATIC, CONTROLS R200    NO. 2 UNIT eves REACTOR COOLANT PUMP SEALS, INSTR.              240629      03      03 SCHEMATIC, CONTROLS N110    NO. 2 UNIT eves LETDOWN &CHARGING SYSTEM, INSTR. SCHEMATIC,    240630      15      15 CONTROLS N600    NO. 2 UNIT SAFETY INJECTION SYS. REFUELING WATER STORAGE &      240631      13      13 BORON INJECTION TANKS, INSTR. SCHEMATIC, CONTROLS N600    NO. 2 UNIT SAFETY INJECTION SYS. ACCUMULATOR PRESSURE &        240632      08      08 LEVEL, INSTR. SCHEMATIC, CONTROLS N620    NO. 2 UNIT SAFETY INJECTION SYS. CONTAINMENT SPRAY, INSTR.      240633      12      12 SCHEMATIC, CONTROLS
* N110    NO. 2 UNIT eves CHEMICAL MAKE-UP LEVEL &FLOW, INSTR.            240634      08      08 SCHEMATIC, CONTROLS T900    NO. 2 UNIT TURBINE AUXILIARIES COOLING, INSTR. SCHEMATIC,      240635      07      07 CONTROLS N210    NO. 2 UNIT R.C. PUMPS COMPONENT COOLING SYSTEM, INSTR. SCH.,    240637      06      06 SHEET 2, CONTROLS F700    NO. 2 UNIT NO. 22 S.G. FEED PUMP &TURBINE LUBE &CONTROL        240638      05      05 OIL, INSTR. SCH., CONTROLS F700    NO. 2 UNIT NO. 22 S.G. FEED PUMP &TURBINE STEAM &              240639      11      11 CONDENSATE, INSTR. SCH., CONTROLS G220    NO. 2 UNIT NO. 21E,22E&23E MSR MAIN STEAM &DRAIN CONTROL,      240640      07      07 INSTR. SCH., CONTROLS G216    NO. 2 UNIT STEAM GENERATORS DRAINS &SLOWDOWN, INSTR.            240643      10      10 SCHEMATIC, CONTROLS M%0      NO. 2 CONTAINMENT &PENETRATION AREA VENTILATION                240M6                14 E570    NO. 2 UNIT TURBINE GENERATOR HYDROGEN SEAL OIL SYSTEM,          240647      06      06 INSTR. SCHEMATIC, CONTROLS
* M600    NO. 2 UNIT SERVICE WATER SYSTEM TURBINE AREA, INSTR.            240656      05      05 SCHEMATIC, CONTROLS
 
Page No.  %
11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Dra~ing Number TRAINING STATION LOAD SYSTEM    TITLE                                                          DRAWING  REVISION 11/01/89
  ------    ============================================================    -------  ======== ========
N130      NO. 2 UNIT eves PRIMARY WATER RECOVERY SYSTEM, INSTR.          21'.0657 05      05 SCHEMATIC, CONTROLS N600      NO. 2 UNIT SERVICE WATER CONTAINMENT VENTILATION, INSTR.        240658  07      07 SCHEMATIC, CONTROLS G210      NO. 2 UNIT PENETRATION AREA NO. 21&23 STEAM GENERATORS MAIN    240659  13      13 STEAM PRESSURE, INSTRUMENT SCHEMATIC, CONTROLS G210      NO. 2 UNIT PENETRATION AREA NO. 22&24 STEAM GENERATORS MAIN    240660  14      14 STEAM PRESSURE, INSTRUMENT SCHEMATIC, CONTROLS G210      NO. 2 UNIT TURBINE MAIN &BY-PASS STEAM, INSTRUMENT              240661  10      10 SCHEMATIC SHEET 1, CONTROLS G210      NO. 2 UNIT REACTOR CONTAINMENT NO. 21 S.G. LEVEL &STEAM        240662  05      05 FLOW, INSTRUMENT SCHEMATIC, CONTROLS
* G210 G210 NO. 2 UNIT REACTOR CONTAINMENT NO. 22 S.G. LEVEL &STEAM FLOW, INSTRUMENT SCHEMATIC, CONTROLS NO. 2 UNIT REACTOR CONTAINMENT NO. 23 S.G. LEVEL &STEAM FLOW, INSTRUMENT SCHEMATIC, CONTROLS 240663 240664 05 06 05 06 G210      NO. 2 UNIT REACTOR CONTAINMENT NO. 24 S.G. LEVEL &STEAM        240665  06      06 FLOW, INSTRUMENT SCHEMATIC, CONTROLS G220      NO. 2 UNIT T.G.A.-REHEAT STEAM CONDENSER VACUUM BASKETS,        240667  06      06 INSTR. SCHEMATIC, CONTROLS R600      NO. 2 UNIT REACTOR CONTAINMENT NO. 2 PRESS. &PRESS. RELIEF      240668  18      18 TKS., INSTR. SCHEMATIC, CONTROLS N1~00    NO. 2 UNIT CONT. HYDROGEN GAS SAMPLE-SAMPLING &F.W. ANAL.      240669  13      13 SYS., INSTR. SCHEMATIC, CONTROLS M200      NO. 2 UNIT FIRE PROTECTION, INSTR. SCHEMATIC, CONTROLS          240673  03      03 M910      NO. 2 UNIT AUXILIARY BUILDING VENTILATION SYSTEM, INSTR.        240674  14      14 SCHEMATIC SH. 1, CONTROLS MCOO      NO. 2 UNIT EMERGENCY CONTROL AIR COMPRESSOR, INSTR.            240675  15      15 SCHEMATIC, CONTROLS
* M600      NO. 2 UNIT SERVICE WATER SYSTEM NO. 21 HEADERS NUCLEAR AREA, INSTR. SCH. SHEET 1, CONTROLS 240676  10      10
 
Page No. 95 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
  ------  ============================================================  ------- ======== ========
M600    NO. 2 UNIT SERVICE WATER SYSTEM NO. 22 HEADERS NUCLEAR AREA,  240677  14      14 INSTR. SCH. SHEET 1, CONTROLS M921    NO. 2 UNIT CONTROL ROOM AIR CONDITIONING &VENTILATION,        240678  a        14 INSTR. SCHEMATIC, CONTROLS M924    NO. 2 UNIT FUEL HANDLING AREA VENTILATION SYSTEM, INSTR.      240679  07      07 SCHEMATIC, CONTROLS G216    NO. 2 UNIT STEAM GENERATORS BLOWDOWN FILTER, INSTR.            240680  7        7 SCHEMATIC, CONTROLS F800    NO. 2 UNIT MISC. CONDENSATE, INSTR. SCHEMATIC, CONTROLS        240681  07      07 T800    NO. 2 UNIT CIRC. WATER SYSTEM CIRCULATING WATER CONDENSER      240685  06      06 AREA, INSTR. SCHEMATIC, CONTROLS
* E540    NO. 2 UNIT GENERATOR STATOR COOLING WATER, INSTR. SCHEMATIC,  240686  07      07 CONTROLS T500    NO. 2 UNIT GENERATOR LUBE OIL &TURB. TRIP, INSTR.              240687  12      12 SCHEMATIC, CONTROLS TlOO    NO. 2 UNIT TURB. ELECTRO-HYDRAULIC CONTROL, INSTR.            240688  02      02 SCHEMATIC, CONTROLS T300    NO. 2 UNIT TURBINE GLAND SEALING STEAM &LEAK-OFF, INSTR.      240689  04      04 SCHEMATIC, CONTROLS T200    NO. 2 UNIT TURBINE DRAINS BLEED STEAM EXTRACTION STOP          240691  03      03 VALVES, INSTR. SCHEMATIC, CONTROLS T200    NO. 2 UNIT TURBINE DRAINS BLEED STEAM F.W. HEATER DRAINS,      240692  05      05 INSTR. SCHEMATIC, CONTROLS T200    NO. 2 UNIT TURBINE DRAINS TURB. MAIN STM,. COLD REHEAT STM. 240693  05      05 TO M.S.R. COILS &LOW PRESSURE TO FEEDWATER PUMP TURBINE, INSTR. SCHEMATIC, CONTROLS N230    NO. 2 UNIT FUEL HANDLING BLDG. SPENT FUEL PIT COOLING LOOP,    2rn6%  06      06 INSTR. SCHEMATIC, CONTROLS F600    NO. 2 UNIT FEEDWATER-NO. 21,22,23 HEATER DRAIN PUMPS          240695  04      04
* F500 RECIRC., INSTR. SCHEMATIC, CONTROLS NO. 2 UNIT FEEDWATER-NO. 23A-25C L.P. F.W. HEATER BYPASS, INSTR. SCHEMATIC, CONTROLS 240696  02      02
 
Page No. 96 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
          ============================================================            ======== ========
M%0      NO. 2 UNIT CONTAINMENT VENT. NO. 21 FAN COIL UNIT, INSTR.      240700  04      04 SCHEMATIC, CONTROLS M%0      NO. 2 UNIT CONTAINMENT VENT. NO. 22 FAN COIL UNIT, INSTR.      240701  04      04 SCHEMATIC, CONTROLS M%0      NO. 2 UNIT CONTAINMENT VENT. NO. 23 FAN COIL UNIT, INSTR.      240702  04      04 SCHEMATIC, CONTROLS M940    NO. 2 UNIT CONTAINMENT VENT. NO. 24 FAN COIL UNIT, INSTR.      240703          04 SCHEMATIC, CONTROLS M940    NO. 2 UNIT CONTAINMENT VENT. NO. 25 FAN COIL UNIT, INSTR.      240704  04      04 SCHEMATIC, CONTROLS FOOD    NO. 1 UNIT CONDENSER HOTWELLS NO. 12 &13 CONDENSERS            240711  03      03 CONDENSATE FEED SYSTEM, INSTR. SCHEMATIC, CONTROLS
* FOOD    NO. 2 UNIT CONDENSER HOTWELLS NO. 21,22&23 CONDENSERS          240712  06      06 CONDENSATE FEED SYSTEM, INSTR. SCHEMATIC, CONTROLS M600    NO. 2 UNIT SERVICE WATER SYSTEM NO. 21 HEADERS NUCLEAR AREA,    240715  07      07 INSTR. SCH. SHEET 2, CONTROLS M600    NO. 2 UNIT SERVICE WATER SYSTEM NO. 22 HEADERS NUCLEAR AREA,    240716  09      09 INSTR. SCH. SHEET 2, CONTROLS R600    PRESSURIZERS OVERPRESS. PROT. SYS. CH. I&II R.C. TEMP. &        241108  02      02 PRESS. CH. SELEC. SCHEMATIC SHEET 1, CONTROLS F310    NO. 2 CONDENSER CONTROLS MAKEUP NO. 21 &22 CONDENSATE          241808  03      03 TRANSFER PUMPS M940    CONTAINMENT VENT. NO. 11 &12 FAN-COIL UNITS VALVES SW223,      241969  02      02 S257 &SW65, LOGIC DIAGRAM, CONTROLS M940    CONTAINMENT VENT. NO. 13 &14 FAN-COIL UNITS VALVES SW223,      241970  02      02 SW57 &SW65, LOGIC DIAGRAM, CONTROLS M940    CONTAINMENT VENT. NO. 15 FAN-COIL UNIT VALVES SW223, SW57 &    241971  02      02 SW65, LOGIC DIAGRAM, CONTROLS R600    PRESSURIZERS OVER PRESS. PROT. SYSTEM CH. I CONTROL &          242508  02      02
* R600 INDICATIONS, LOGIC DIAGRAM, CONTROLS PRESSURIZERS OVER PRESS. PROT. SYSTEM CH. II CONTROL &
INDICATIONS, LOGIC DIAGRAM, CONTROLS 242524  07      07
 
I                                                      ----                                  -----------
'
Page No. 97 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
    ------  ============================================================    ------- ======== ========
C900    NO. 2 RADIATION MONITORING SYSTEM TRIP CHANNELS BYPASS CONT    242625  03      03 ROL, INDICATION &ALARMS - SHEET 1 OF 3 C900    NO. 2 RADIATION MONITORING SYSTEM TRIP CHANNELS BYPASS CONT    242626  02      02 ROL, INDICATION AND ALARMS - SHEET 2 OF 3 C900    NO. 2 UNIT RAD. MON. SYSTEM TYPE M-861 AREA MONITORS,          242630  DD      DD FUNCTIONAL DIAGRAM, CONTROLS C900    NO. 2 UNIT RAD. MON. SYSTEM CONDENSER AIR EJECTOR MON. 2R15,    242631  DO      00 FUNCTIONAL DIAGRAM, CONTROLS C900    NO. 2 UNIT RAD. MON. SYSTEM LIQUID WASTE DISPOSAL MON. 2R18,    242632  00      DD FUNCTIONAL DIAGRAM, CONTROLS C900    NO. 2 UNIT RAD. MON. SYSTEM FAILED FUEL LETDOWN LINE MONITOR    242633  OD      DD 2R31, FUNCTIONAL DIAGRAM, CONTROLS
* C900 C900 NO. 2 UNIT RAD. MON. SYSTEM 2R11A, 2R41A PART. SAMPLING MON., FUNCTIONAL DIAGRAM, CONTROLS NO. 2 UNIT RAD. MON. SYSTEM 2R12A, 2R41C NOBLE GAS SAMP.
MON., FUNCTIONAL DIAGRAM, CONTROLS 242634 242635 00 OD DD DO C900    NO. 2 UNIT RAD. MON. SYSTEM 2R12B, 2R41B IODINE SAMP. MONS.,    242636  DD      DO FUNCTIONAL DIAGRAM, CONTROLS C900    NO. 2 UNIT RAD. MON. SYSTEM CONTROL RM. INTAKE DUCT MON.        242637  00      00 2R1B, FUNCTIONAL DIAGRAM, CONTROLS C900    NO. 2 UNIT RAD. MON. SYSTEM FAN COIL UNITS-PRCS. MON.          242641  00      OD 2R13A-C, FUNCTIONAL DIAGRAM, CONTROLS C900    NO. 2 UNIT RAD. MON. SYSTEM CONTROL RM. INTAKE DUCT MON.        242642  DO      OD 2R1A, FUNCTIONAL DIAGRAM, CONTROLS C900    NO. 2 UNIT RAD. MON. SYSTEM PLANT VENT. (GROSS) PRCS. MON.      242643  DO      DD 2R16, FUNCTIONAL DIAGRAM, CONTROLS C900    NO. 2 UNIT RAD. MON. SYSTEM COMP. COOLING LIQ. PRCS. MON.      242644  DD      DD 2R17A+B, FUNCTIONAL DIAGRAM, CONTROLS C900    NO. 2 UNIT RAD. MON. SYSTEM S.G. BLOWDOWN PRCS. MON.            242645  DD      DD
* C900 2R19A-D, 2R35, FUNCTIONAL DIAGRAM, CONTROLS NO. 2 UNIT RAD. MON. SYSTEM CONTAINMENT (POST LOCA) MON.
2R21, FUNCTIONAL DIAGRAM, CONTROLS 242651  DO      00
 
Page No. 98 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                          DRAWING REVISION 11/01/89
            ============================================================            ======== ========
C900    NO. 2 UNIT RAD. MON. SYSTEM CONTROL ROOM RECORDER PANEL        242772  08      08 2RP1 HIGH RADIATION ALARMS, ARRANGEMENT, CONTROLS R600    PRESSURIZERS OVER PRESS. PROT. SYS. CH. I &II CONTROL &        242880  05      05 INDICATIONS, FUNCTIONAL DIAGRAM, CONTROLS F800    NO. 2 UNIT COND. POLISHING SYS. BY-PASS VALVES 21CN108,        244850  02      02 22CN108, 23CN108 &INFLUENT VALVE 2CN109, SCHEMATIC, SHEET 1, CONTROLS F800    NO. 2 UNIT COND. POLISHING SYS. BY-PASS VALVES 21CN108,        244851  02      02 22CN108, 23CN108, SCHEMATIC, SHEET 2, CONTROLS F800    NO. 2 UNIT COND. POLISHING SYS. INFLUENT VALVE 2CN109,          244852  03      03 SCHEMATIC, SHEET 3, CONTROLS M600    NO. 2 UNIT SERVICE WATER SYSTEM COMPONENT COOLING WATER HEAT    246686  02      02 EXCHANGER SERVICE WATER VALVES, LOGIC DIAGRAM, CONTROLS
* M600    NO. 2 UNIT SERVICE WATER SYSTEM, SERVICE WATER NUCLEAR          246688  02      02 HEADER BY-PASS RELIEF SYSTEM, LOGIC DIAGRAM, CONTROLS F700    NO. 11 (21) S.G. FEED PUMPS &TURBINES TRIP CONTROL &IND.,      247404  10      10 SCHEMATIC, CONTROLS F700    NO. 12 (22) S.G. FEED PUMPS &TURBINES TRIP CONTROL &IND.,      20405  10      10 SCHEMATIC, CONTROLS R600    1GP &2GP 480V BUSES NO. 11&21 BACK-UP GROUP PRESSURIZER        20922  02      02 HEATER EMERG. FEED, SCHEMATIC, CONTROLS R600    lEP &2EP 480V BUSES NO. 12&22 BACK-UP GROUP PRESSURIZER        20992  02      02 HEATER EMERG. FEED, SCHEMATIC, CONTROLS F320    NO. 2 CONDENSER AIR REMOVAL &PRIMING NO. 22 VACUUM AND          248340  01      01 SEALWATER PUMPS F320    NO. 2 CONDENSER AIR REMOVAL AND PRIMING NO. 22 VACUUM AND      248341  00      00 SEAL WATER PUMPS I  F320    NO. 2 460 &230V AUXILIARIES NO. 23 VACUUM &SEAL WATER          248342  01      01 I            PUMPS I
I
* F200    NO. 2 UNIT CONDENSER AIR REMOVAL &PRIMING, NO. 24 VACUUM &      248343 SEAL WATER PUMPS, SCHEMATIC, CONTROLS I
I I
I I
I L
 
---                                                                          --
Page No. 99 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM  TITLE                                                              DRAWING REVISION 11/01/89
    ------  ============================================================      ------- ======== ========
F320    NO. 2 CONDENSER AIR REMOVAL AND PRIMING NO. 25 VACUUM AND          248849  01      01 SEAL WATER PUMPS F320    NO. 2 UNIT-COND. AIR REM'L &PRIM'G. NO. 23, 24 &25 VACUUM          248883  02      02
            &SEAL WATER PUMPS, LOGIC DIAGRAM, CONTROLS R600    PRESSURIZER, NO. 12 &22 B.U. GROUP HEATERS &NO. 1 &2              248891  03      D3 CONTROL GROUP HEATERS, LOGIC DIAGRAM, CONTROLS C3DO    NO. 1 &2 CONTROL ROOM ANNUNCIATOR DISPLAY &CONTROL                249549  00      DO CONSOLEALARM HORNS G210    NO. 11-14, 21-24 STM GENS. LOW POWER FEEDWATER FLOW,              250894  01      01 FUNCTIONAL DIAGRAM, SHEET 1, CONTROLS G210    NO. 11-14, 21-24 STM GENS. LOW POWER FEEDWATER FLOW,              250895  01      01 FUNCTIONAL DIAGRAM, SHEET 2, CONTROLS
* HWOO HWDO HWOD 2RP1 FRONT VIEW 2RP1 REAR VIEW 2RP1 RAD MON SYS HIGH RAD ALARMS ARRANGEMENT 25140D 251401 2514D2 OD DO OD OD DO 00 HWDD    PANEL CUT-OUTS                                                    251403  DO      00 HWDO    2RP2 FRONT VIEW                                                    251404  00      DO HWOO    2RP2 VENT. DAMPER CONTROL-MIMIC LAYOUT ARRANGEMENT                251405  00      00 HWOD    2RP3 FRONT VIEW                                                    251406  DO      00 Hl~OO    2RP3 REAR VIEW                                                    251407  00      00 HWOO    2RP3 LIFT COIL DISCONNECT SWITCHES ARRGT. &DRILLING PLAN          251408  DO      00 HWOO    2RP3 REACTOR CORE GRAPHIC DISPLAY ARRANGEMENT                      251409  00      DO R170    2RP4 FRONT VIEW                                                    251410  00      00 R170    2RP4 REACTOR PROTECTION SYS STATUS PANEL DRILLING PLAN SH.1        251411  00      DO R17D    2RP4 REACTOR PROTECTION SYS STATUS PANEL DRILLING PLAN SH.2        251412  00      DO
* HWOO    2RP5 FRONT VIEW                                                    251413  00      00
 
Page No. 100 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================  ------- ======== ========
HWOO      2RP6 FRONT VIEW                                                25W4    00      00 HWOO      2RP7 FRONT VIEW                                                251415  00      00 HWOO      2RP8 FRONT VIEW                                                251416  DO      00 HWOO      2RP9 FRONT VIEW                                                251417  00      00 X243      CONTROL CONSOLE DETAILS                                        251418  00      00 HWOO      BASE DETAIL                                                    251U9  00      00 HWOO      UNISTRUT DETAIL                                                251420  OD      00
          '
X243      CONTROL CONSOLE (FRONT VIEW OF CCl, CC2, CC3)                  251421  00      00 X243      2CC1 DRILLING PLAN                                            251422  00      DO
* X243 X243 X243 2CC2 DRILLING PLAN 2CC3 DRILLING PLAN CONSOLE CUT-OUTS 251423 251424 251425 00 00 00 00 OD 00 HWDO      2RP1 BASE DETAIL                                              251426  00      OD HWOO      2RP2 BASE DETAIL                                              251427  DO      00 HWOO      2RP3 BASE DETAIL                                              251428  00      00 HWOD      DOOR LATCH DETAIL                                              251429  00      00 HWDO      CABLE, DO ASSEMBLY                                            251430  00      OD HWOO      CABLE, DI ASSEMBLY                                            251431  00      DO HWDD      CABLE, DAC ASSEMBLY                                            251432  DO      OD HWOO      CABLE, ADC ASSEMBLY                                            251433  DO      00 X243      MISC VIEWS (CONTROL CONSOLE CCl, CC2, CC3)                    251434  02      02 X243      50DKV, 25KV, 13KV, &4KV MIMIC BUS DETAILS                      251435  00      00
* HWOO      2RP9 ASSEMBLY                                                  251435  00      DO
 
--~~---------                                      -                      -    - --
Page No. 101 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                              DRAWING REVISION 11/01/89
      ------    ============================================================      ------- ======== ========
X243      RESIDUAL HEAT REMOVAL, PRESSURIZER RELIEF TANK FRONT VIEW          251436  02      02 X243      #21 STM GEN LEVEL &FLOW RECORDER FRONT VIEW                        251437  01      01 X243      CONDENSATE - COMPONENT COOLING WATER FRONT VIEW                    251438  02      02 X243      #21 STM GEN FEED PUMP &TURBINE HTR DRAIN PUMPS FRONT VIEW          251439  01      01 X243      #22 STM GEN FEED PUMP &TURBINE EXCITATION FRONT VIEW              251440  01      01 X243      STM GEN FEED PUMPS &SAMPLING SYS TURB. GEN. AUX. FRONT VIEW        251441  01      01 X243      REHEAT STEAM TEMPERATURE MAIN STEAM FRONT VIEW                    251442  01      01 X243      SHUT-DOWN, PART LENGTH &CONTROL- ROD COUNTERS FRONT VIEW          251443  01      01 X243      FEEDWATER HEATERS COMPRESSED AIR FRONT VIEW                        251444  01      01
* X243 X243 X243 CIRCULATING WATER CONDENSER FRONT VIEW
                #21 RX COOL. PMP,RX COOL. PMP SEAL LEAK-OFF FLOW FRONT VIEW PRESSURIZER LVL AND TEMP. RX COOLANT PRESSURE FRONT VIEW 251445 251446 25140 01 02 02 01 02 02 X243      #22 RX COOL. PMP CONT ROD GRP-POS.& INS. LIMITS FRONT VIEW        251448  02      02 X243      BORIC ACID &PR!. WTR FLW REGISTERS, RX COOL. SYS FRONT VIEW        251449  01      01 X243      CHARGING SYSTEM #23 RX COOLANT PUMP FRONT VIEW                    251450  01      01 X243      RX COOLANT TEMP. ROD CONTROL FRONT VIEW                            251451  01      01 X243      SERVICE WATER, TURBINE AUXILIARY COOLING WATER FRONT VIEW          251452  01      01 X243      #21 &#22 ACCUMULATOR #2A DIESEL GENERATOR FRONT VIEW              251453  02      02 X243      SAFETY INJECTION FRONT VIEW                                        251454  '1      '1 X243      #22 STEAM GENERATOR, #24 STEAM GENERATOR FRONT VIEW                251455  01      01 X243      CONTAINMENT SPRAY, CRT PANEL ASSEMBLY FRONT VIEW                  251456  01      01 X243      CONTAINMENT VENTILATION AND RECORDERS FRONT VIEW                  251457  01      01
* X243      VENT. AUX. BLDG FUEL HANDLING BLDG &CONTAINMENT FRONT VIEW        251458  02      02
 
                                                                                    -                  -
Page No. 102 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING  REVISION 11/01/89
  ------    ============================================================    -------  ======== ========
X243      TURBINE PROTECTION &WATER TREATMENT                            251459    01      01 PRESSURIZER LEVEL &PRESSURE X243      4KV-2H &2E, 2F &2G GROUP BUS FRONT VIEW                        251460    01      01 X243      13 &500KV GROUP BUS VOLTMETERS FRONT VIEW                      251461    01      01 X243      VOLTMETERS-GEN. &VITAL BUS 2A,2B,2C -SYNCH FRONT VIEW          251462    01      01 X243      ROD POSITION FRONT VIEW                                        251463    01      01 X243      #23 STEAM GENERATOR, RVLIS DISPLAY FRONT VIEW                  251464    02      02 X243      NUCLEAR INSTRUMENTATION POWER RANGE RECORDERS FRONT VIEW        251465    01      01 X243      AUXILIARY FEED PUMPS, AUX. FEED FRONT VIEW                      251466    02      02
* X243      CHEMICAL &VOLUME CONTROL FRONT VIEW                            251467    01      01 X243      #24 REACTOR COOLANT PUMP FRONT VIEW                            251468    01      01 X243      SAFEGUARDS ACT.&CONT PRESS PRI WTR.&BORIC ACID FLW RECORDERS    251469    02      02 X243      STEAM GENRATOR BLOWDOWN MAIN STEAM FRONT VIEW                  251470    01      01 X243      NOS. 28 &2C DIESEL GEN., NOS. 23 &24 ACCUMULATORS FRONT        251471    02      02 VIEW X243      CHEMICAL &VOLUME CONTROL WASTE DISPOSAL FRONT VIEW              251472    02      02 X243      NUCLEAR POWER RANGE RECORDER FRONT VIEW                        251473    01      01 X243      E.H. OPERATOR'S PANEL FRONT VIEW SHEET 1                        251474    01      01 X243      E.H. OPERATOR'S PANEL FRONT VIEW SHEET 2                        251475    01      01 HWOO      CABLE, ADC(16 BIT) ASSEMBLY WIRING                              25106    OD      DD HWOD      GENERAL ARRANGEMENT OF THE SIMULATOR AREA                      251477    OD      OD HWOO      COMPUTER CONSOLE PANEL 2RP8 DETAILS                            251478    DD      DD HWDO      COMPUTER CONSOLE PANEL 2RP8 REAR DOOR DETAIL                    251479    OD      OD
* HWDO      COMPUTER CONSOLE PANEL 2RP8 FRONT DOOR DETAIL                  25148D    DO      OD
 
                                            ------
Page No. 103 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING  REVISION 11/01/89
  ------    ============================================================    ------- ========  ========
NO DRAWING                                                      251481 HWOO      2RP1-2RP6 REAR DOOR DETAILS                                    251482  OD        00 NO DRAWING                                                      251483 E110      ELEC PWR DIST. SYS, ONE LINE DIAGRAM 500KV, 13KV, 4KV SWYD      251484  00        00 E110      ELECT PWR DIST. SYS, ONE LINE DIAGRAM 500KV, 13KV, 4KV SWYD    251484  DO        DD E140      ELECT PWR DIST. SYS, 1 LINE DIAG. 460V &230V GROUP &VITAL      251485  00        DO BUS E140      ELECT PWR DIST. SYS, 1 LINE DIAG. 460V &230V GROUP &VITAL      251485  OD        DO BUS E140      ELECT PWR DIST. SYS, 1 LINE DIAG. 460V &230V GROUP &VITAL      251485  00        00
* BUS E140      ELECT PWR DIST. SYS, 1 LINE DIAG. 460V &230V GROUP &VITAL      251485  DD        00 BUS E140      ELECT PWR DIST. SYS, 1 LINE DIAG. 460V &230V GROUP &VITAL      251485  00        00 BUS E140      ELECT PWR DIST. SYS, 1 LINE DIAG. 460V &230V GROUP &VITAL      251485  OD        00 BUS E140      ELECT PWR DIST. SYS, 1 LINE DIAG. 460V &230V GROUP &VITAL      251485  00        OD BUS PROCESS SIMULATION SOFTWARE INTERFACE                          251{~86 00        00 HWOO      COMPUTER CONSOLE PANEL 2RP8 BASE DETAIL                        251487  00        DO HWOO      2RP7 BASE DETAIL                                                251488  00        00 E500      GEN. &VOLTAGE REG. SYS. SCHEMATIC DIAGRAM                      251489  00        DO E500      GENERATION SIMULATION DIAGRAM                                  251490  00        00 E500      EXCITATION SYSTEM SCHEMATIC DIAGRAM                            251491  OD        OD
* E500 G220 EXCITATION SYSTEM SIMULATION DIAGRAM STEAM GENERATOR, STEAM FLOW NETWORK &ENERGY 251492 251493 OD 00 00 OD
 
                                                                                  ---------~--------
Page No. 104 11/28/89 SALEM SIMULATOR Simulator Design Database
* SYSTEM
  ------
TITLE Sorted by Drawing Number
            ============================================================
DRAWING
                                                                          -------
STATION REVISION
                                                                                      ========
TRAINING LOAD 11/Dl/89
                                                                                              ========
G22D      STEAM GENERATOR, STEAM FLOW NETWORK &ENERGY                    251493    DD      DO R200      REACTOR COOLANT SYSTEM                                        251494    00      00 R6DO      PRESSURIZER RELIEF TANK AND STANDPIPES                        251495    00      00 N6DO      SAFETY INJECTION SYSTEM                                        251496    01      01 N220    -RESIDUAL HEAT REMOVAL SYSTEM                                  251497    00      DO NlDD      CHEMICAL &VOLUME CONTROL SYSTEM                                251498    DD      DO NlDD      CHEMICAL &VOLUME CONTROL SYSTEM                                25a99      01      01 M900      CONTAINMENT &AUXILIARY BUILDINGS VENTILATION SYSTEMS          2515DD    DD      00 M900      CONTAINMENT &AUXILIARY BUILDING VENTILATION SYSTEMS            251500    00      DO
* N620 N530 NlOD CONTAINMENT SPRAY SYSTEM CONTAINMENT &WASTE DISPOSAL, WASTE DISPOSAL LIQUID &GAS PRIMARY WATER RECOVERY SYSTEM 251501 251502 251503 OD 02 DD 00 D2 OD F300      LIQUID FLOW NETWORK &ENERGY, CONDENSATE FLOW                  251504    00      00 F300      LIQUID FLOW NETWORK &ENERGY, CONDENSATE FLOW                  251504    DO      DO F300      LIQUID FLOW NETWORK &ENERGY, FEEDWATER FLOW                    251505    01      01 F300      LIQUID FLOW NETWORK &ENERGY, HEATER DRAINS SYSTEM              251506    00      00 F320      CONDENSER AIR REMOVAL AND PRIMING                              251507    01      01 F800      CONDENSATE &FEEDWATER MISC                                    251508    01      01 G216      STEAM GENERATOR SLOWDOWN SYSTEM                                251509    Dl      01 GlDD      STEAM FLOW NETWORK &ENERGY, BLEED STEAM &REHEATERS            251510    DO      00 GlOO      STEAM FLOW NETWORK &ENERGY, BLEED STEAM &REHEATERS            251510    DO      DO T700      TURBINE POWER &SUPERVISORY                                    251511    OD      OD
* T5DO      TURBINE LUBE OIL &COOLING, MAIN TURBINE                        251512    00      00
 
                                                ---    -                -
Page No. 105 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                            DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
T500      TURB. LUBRICATING &COOLING, SGFPT LUBE OIL SYSTEM                251513  00      00 M600      SERVICE WATER SYSTEM                                            251514  00      00 T800      CIRCULATING WATER SYSTEM                                        251515  00      00 N210      COMPONENT COOLING SYSTEM                                        251516  01      01 N210      COMPONENT COOLING SYSTEM                                        251516  01      01 T900      TURBINE AUXILLARY COOLING &GENERATOR STATOR WATER COOLING        251517  00      00 MCOO      COMPRESSED AIR                                                  251518  00      00 HWOO      GENERAL ARRANGEMENT FLOOR PLAN                                  251519  00      00 HWOO      GENERAL ARRANGEMENT CABLE ROUTING                                251520  00      00
* R6DD R6DO NO DRAWING PRESSURIZER- PRESSURE &LEVEL, PROTECTION &CONTROL PRESSURIZER- PRESSURE &LEVEL, PROTECTION &CONTROL 251521 251522 251522 OD 00 OD 00 G210      STEAM DUMP CONTROL, SIMULATION SCHEMATIC                        251523  00      DO F300      21-24 STEAM GENRATOR CONTROL
 
==SUMMARY==
LEVEL SIM. SCHEMATIC        251524  00      00 (SHEET 13 & 14)
F300      21-24 STEAM GENERATOR CONTROL
 
==SUMMARY==
LEVEL SIM. SCHEMATIC      251524  00      00 (SHEET 13 & 14)
F30D      21-24 STEAM GENERATOR CONTROL
 
==SUMMARY==
LEVEL SIM. SCHEMATIC      251524  00      00 (SHEET 13 &14)
SIMULATED SYSTEM PROCESS DIAGRAM LEGENDS &GENERAL REFERENCE      251525  00      OD R1DD      REACTOR CONTROL SIMULATION SCHEMATIC                            251526  00      00 X243      CONTROL CONSOLE 2CC1 ASSEMBLY                                    251527  00      00 X243      CONTROL CONSOLE 2CC1 PARTS LIST                                  251528  00      00
* X243 X243 CONTROL CONSOLE 2CC2 ASSEMBLY CONTROL CONSOLE 2CC2 PARTS LIST 251529 251530 00 01 00 01
 
Page No. 106 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
X24.3      CONTROL CONSOLE 2CC3 ASSEMBLY                                  251531  00      00 X24.3      CONTROL CONSOLE 2CC3 PARTS LIST                                251532  OD      DO HWOO      2RP7 ASSEMBLY                                                  251533  00      OD HWOO      2RP7 PARTS LIST                                                251534. 00      DO HWOD      2RP9 PARTS LIST                                                251536  DO      OD HWOD      2RP1 ASSEMBLY                                                    251537  00      00 HWDD      2RP1 PARTS LIST                                                251538  00      DO HWOO      2RP2 ASSEMBLY                                                    251539  DO      DO HWOO      2RP2 PARTS LIST                                                25154.0 00      OD
* H~IOO HWOD R170 2RP3 ASSEMBLY 2RP3 PARTS LIST 2RP4. ASSEMBLY 25154.1 25154.2 25154.3 DO 00 OD DO OD DO R170      2RP4 PARTS LIST                                                25154.4 DO      DO HWOO      2RP5 ASSEMBLY                                                    25154.5 00      00 HWDO      2RP5 PARTS LIST                                                  25154.6 00      DO HWOD      2RP6 ASSEMBLY                                                    251547  OD      00 HWOO      2RP6 PARTS LIST                                                  251548  OD      DO F300      tt22 STM GENERATOR CONTROL
 
==SUMMARY==
LVL SIMULATION SCHEMATIC      25154.9 DO      DO F300      122 STM GENERATOR CONTROL
 
==SUMMARY==
LVL SIMULATION SCHEMATIC      25154.9 OD      DO F300      #23 STM GENERATOR CONTROL
 
==SUMMARY==
LVL SIMULATION SCHEMATIC      251550  DO      00 F300      123 STM GENERATOR CONTROL
 
==SUMMARY==
LVL SIMULATION SCHEMATIC      251550  DO      DO F300      tt24. STM GENERATOR CONTROL
 
==SUMMARY==
LVL SUMULATION SCHEMATIC    251551  DD      OD
* F3DD      #24. STM GENERATOR CONTROL
 
==SUMMARY==
LVL SIMULATION SCHEMATIC      251551  00      DD
 
I                                                                          --          ------------------
Page No. 107 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
    ------    ============================================================    ------- ======== ========
INSTRUMENTATION AND CONTROL LEGEND &GENERAL REFERENCES          251552  00      00 SIMULATOR TASK STRUCTURE                                        251553  00      00 HWOO      #21 HYDROGEN RECOMBINER FRONT VIEW                              251554  00      00 HWOO      tt21 HYDROGEN RECOMBINER REAR VIEW                              251555  00      00 HWOO      #22 HYDROGEN RECOMBINER FRONT VIEW                              251556  00      00 HWOO      tt22 HYDROGEN RECOMBINER REAR VIEW                              251557  00      00 HWOO      SSPS SYSTEM, OUTPUT TEST &INTERFACE CABINET DOOR #2            251558  00      OD HWOO      SSPS SYSTEM, OUTPUT TEST &INTERFACE CABINET DOOR #3            251559  OD      DO HWDO      SSPS SYSTEM, OUTPUT TEST &INTERFACE CABINET DOOR #4            251560  OD      00
* HWOO HWOO HWOO SSPS OUTPUT TEST &INTERFACE CAB. FRONT VIEW -- TRAIN A SSPS OUTPUT TEST &INTERFACE CAB. REAR VIEW -- TRAIN A SSPS OUTPUT TEST &INTERFACE CAB. FRONT VIEW -- TRAIN B 251561 251562 251563 00 00 00 00 DO 00 HWOD      SSPS OUTPUT TEST &INTERFACE CAB. REAR VIEW -- TRAIN B          251564  00      00 HWOO      SSPS LOGIC CABINET, LOGIC TEST PANEL                            251565  00      OD HWOD      SSPS LOGIC CABINET BRACKET, WARNING LAMP                        251566  OD      00 E153      ELEC. PWR DIST. SYS. ONE LINE DIAG. 115V AC SUSSES              251567  DD      OD HWOD      ANNUNCIATOR FRAME, LEFT SIDE FRONT VIEW                        251568  DO      OD HWDD      ANNUNCIATOR FRAME, RIGHT SIDE FRONT VIEW                        251569  DD      DO HWOD      NUC. INSTRUMENTATION, DECTECTOR CAB. COMPARATOR                251570  DO      DD HWDD      SSPS SYS., OUTPUT TEST &INTERFACE CAB. DOOR #1                  251571  00      DD HliDO    NUCLEAR INSTRUMENTATION CABINET REAR VIEW                      251572  01      01 NUCLEAR INSTRUMENTATION CABINET REAR VIEW                      251573  OD      OD
  **
HWOO HWDO      FLUX MAPPING SYSTEM FRONT VIEW                                  251574  01      01
 
Page No. 108 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/Dl/89
  ------    ============================================================  ------- ======== ========
HWDD      FLUX MAPPING SYSTEM REAR VIEW                                  251575  OD      DO HWOO      SOLID STATE PROTECTION SYS, LOGIC CABINET FRONT VIEW TRAIN-A  251576  OD      00 Hl400    SOLID STATE PROTECTION SYS, LOGIC CABINET REAR VIEW TRAIN-A    251577  00      00 HWOO      SOLID STATE PROTECTION SYS, LOGIC CABINET FRONT VIEW TRAIN-B  251578  00      00 Hl400    SOLID STATE PROTECTION SYS, LOGIC CABINET REAR VIEW TRAIN-B    251579  00      OD HWDD      RADIATION MONITORING SYSTEM CABINET FRONT VIEW                251580  01      01 HWOO      RADIATION MONITORING SYSTEM CABINET REAR VIEW                  251581  00      OD HWOO      BRACKET, CABLE SUPPORT (2RP1)                                  251582  DO      OD HWOD      POWER DIST. PANEL, FLUX MAPPING SYSTEM                        251583  DO      OD
* HWOO HWOO HWDO PATH DISPLAY, FLUX MAPPING SYSTEM COMMON CONTROLS FLUX MAPPING SYSTEM 2RP1 FRONT VIEW 251584 251585 251586 00 00 01 OD 00 01 Hl400    2RP1 FRONT VIEW                                                251587  01      01 HWOO      2RP2 FRONT VIEW                                                251588  DO      00 HWOO      2RP2 FRONT VIEW                                                251589  01      01 HWOO      2RP3 FRONT VIEW                                                251590  00      00 HWOO      2RP3 FRONT VIEW DETAIL                                        251591  00      OD R170      2RP4 FRONT VIEW                                                251592  00      OD R170      2RP4 FRONT VIEW DETAIL                                        251593  00      00 R170      2RP4 FRONT VIEW DETAIL                                        251594  00      OD HWOO      2RP5 FRONT VIEW                                                251595  Dl      01 HWOO      2RP5 FRONT VIEW DETAIL                                        251596  01      Dl
* HWOD      2RP6 FRONT VIEW                                                251597  01      Dl
 
Page No. 109 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================  ------- ======== ========
HWOO      2RP7 FRONT VIEW                                                251598  DO      DO HWOO      2RP8 FRONT VIEW                                                251599  01      01 HWOD      2RP9 FRONT VIEW                                                251600  01      01 HWOO      PLATE, POWER SUPPLY MTG.                                      251601  DO      DO HWOO      PANEL FRONT HYDROGEN RECOMBINER                                251602  DO      DO HWOO      CABINET BASE HYDROGEN RECOMBINER                              251603  DO      DO HWOO      ASSEMBLY HYDROGEN RECOMBINER                                  251604  DO      DO HWOO      PARTS LIST HYDROGEN RECOMBINER                                251605  OD      DO HWOO      NUCLEAR INSTRUMENTATION ASSEMBLY                              251606  DO      DO
* HWOO HWOO HWOO PARTS LIST NUCLEAR INSTRUMENTATION 2RP1 REAR VIEW 2RP1 REAR VIEW DETAIL 251607 251608 251609 DO DO DO OD OD DO HWOO      2RP1 REAR VIEW DETAIL                                          251610  DO      DO HWOO      2RP2 REAR VIEW                                                251611  OD      OD HWOO      2RP3 REAR VIEW                                                251612  DO      DO HWOD      2RP3 REAR VIEW DETAIL                                          251613  DO      DD R17D      2RP4 REAR VIEW                                                251614  DD      OD R170      2RP~  REAR VIEW DETAIL                                        251615  00      DO R17D      2RP4 REAR VIEW DETAIL                                          251616  OD      DO HWOD      2RP5 REAR VIEW                                                251617  DO      DO HWOD      2RP5 REAR VIEW DETAIL                                          251618  OD      DO 251619  00      DO
* HWOO      2RP6 REAR VIEW HWOO      2RP7 REAR VIEW                                                251620  DO      DO
 
                                                                                                      - -- ---
Page No. 110 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
HWOO      2RP8 REAR VIEW                                                  251621  00      OD HWOO      2RP9 REAR VIEW                                                  251622  DO      00 HWOO      TURBINE E-H CONTROL PANEL                                      251623  00      00 HWOO      SSPS LOGIC CABINET FRONT VIEW                                  251624  00      00 HWOO      PANEL, AUXILIARY THERMOCOUPLE SWITCHES FLUX MAPPING SYSTEM      251625  00      00 HWDO      PANEL BLANK, FLUX MAPPING SYSTEM                                251626  DO      00 HWOO      SSPS LOGIC CABINET POWER SUPPLY                                251627  DO      00 HWOO      ESCUTCHEON PLATE FLUX MAPPING SYSTEM                            251628  00      00 HWOO      ROTOR VIBRATION PANEL                                          251629  OD      00
* HWDO HWOO HWOO CASING/DIFFERENTIAL EXPANSION PANEL ROTOR ECCENTRICITY PANEL DIFFERENTIAL EXPANSION PANEL 251630 251631 251632 DO 00 00 DO 00 00 Hl~OD    ROTOR POSITION PANEL                                            251633  DO      DO HWDO      TSI POWER DRAWER                                                251634  00      00 HWOO      DETECTOR READOUT, FLUX MAPPING SYSTEM                          251635  00      00 HWOO      OPERATORS PANEL                                                251636  00      00 HWOO      CRT PANEL                                                      251637  00      00 HWOO      BATTERY SUPPLY FLUX MAPPING SYSTEM                              251638  00      DO HWOD      SSPS LOGIC CABINET PANEL, LOGIC TEST                            251639  00      00 HWOO      SSPS LOGIC CABINET, OUTPUT RELAY TEST PANEL                    251640  00      00 HWOO      PANEL, ELECTRONIK 15 MT. FLUX MAPPING SYSTEM                    251641  OD      00 HWOO      WESTRONICS CHART RECORDER MTG. FLUX MAPPING SYSTEM              251642  00      00
* HWDO      DETECTOR CONTROL FLUX MAPPING SYSTEM                            251643  DO      00
 
-~---*---
                                                      ------                                      ----~~------1 I
Page No. 111 11/28/89 SALEM SIMULA TOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION    LOAD SYSTEM    TITLE                                                          DRAWING REVISION  11/01/89
        ------    ============================================================    ------- ========  ========
HWOO      PANEL, BLANK FLUX MAPPING SYSTEM                                251644  DO        DO HWOO      PROTECTIVE COVER (2RP3)                                        251645  OD        DO HWOO      HINGE SUPPORT (2RP3)                                            251646  DO        DO H~JOO    REACTIVITY COMPUTER, 7746A &L&N RECORDERS FRONT VIEW            251647  01        01 HWOO      REACTIVITY COMPUTER, 7746A &L&N RECORDERS REAR VIEW            251648  DO        00 HWOO      SCALER-TIMER NUCLEAR INSTRUMENTATION                            251649  00        00 HWOO      BRACKET, NIXIE TUBE MTG. (SCALER-TIMER)                        251650  00        00 HWOO      SSPS SYS., OUPUT TEST &INTERFACE CABINET FRONT VIEW            251651  Ori        00 HWOO      SSPS SYSTEM, OUTPUT TEST &INTERFACE CABINET (INNER PANEL)      251652  OD        OD
* HWOO HWOO HWOO SUPPORT, DECIMAL POINT (SCALER-TIMER)
PANEL, BLANK FLUX MAPPING SYSTEM ENGRAVING, SCALER-TIMER PANEL NUCLEAR INSTRUMENTATION 251653 251654 251655 DO DO DO OD OD 00 R170      2RP4 FRONT &REAR VIEW                                          251656  01        01 HWOO      ANNUNCIATOR, LEFT SIDE FRONT VIEW                              251657  00        00 HWOO      ANNUNCIATOR, RIGHT SIDE FRONT VIEW                              251658  DO        DO HWOO      ANNUNCIATOR, LEFT SIDE REAR VIEW                                251659  OD        DO HWOO      ANNUNCIATOR, RIGHT SIDE REAR VIEW                              251660  DO        OD HWOO      SALEM SIMULATOR COMPUTER HARDWARE &PERIPHERALS                  251661  DO        DO Hl400    PARTS LIST FLUX MAPPING                                        251662  DO        OD HWOO      FLUX MAPPING ASSEMBLY                                          251663  OD        00 G220      STEAM DUMP CONTROL SYSTEM (SUBSYSTEM XD1560)                    251664  DO        00 E560      ELECTRICAL DISTRIBUTION RELAY ENERGIZATION-1                    251665  DO        DO
* E560      ELECTRICAL DISTRIBUTION RELAY ENERGIZATION-1                    251665  00        DO
 
                                                                        -
Page No. 112 11/28/89 SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
E560      ELECTRICAL DISTRIBUTION RELAY ENERGIZATION-2                    251666  OD      DO E560      ELECTRICAL DISTRIBUTION RELAY ENERGIZATION-2                    251666  DO      00 E560      ELECTRICAL DISTRIBUTION RELAY ENERGIZATION-2                    251666  00      00 E130      ELEC. DIST. ISOL. TRIP REG. FOR tt2 AUXILIARY TRANSF.          251667  01      01 E110      ELECT. DISTRIBUTION BKR. LOGIC (500KV BKRS.)                    251668  00      00 E110      ELECT. DISTRIBUTION BKR. LOGIC (500KV BKRS.)                    251668  00      00 E130      ELEC. DISTRIBUTION BKR. LOGIC (DIESEL GEN. BKRS.)              251669  00      00 E130      ELEC. DISTRIBUTION BKR. LOGIC GP I=l,18                        251670  01      01 E130      ELEC. DIST. TAP., INTER. &AUTO. CLOS. SIGNAL FOR 4KV GP BUS    251671  00      00
* BKR E130      ELECT. DIST. TAP., INTER. &AUTO. CLS. SIGNAL FOR 4KV GP BUS    251671  00      00 BKR E130      ELECT. DIST. TAP., INTER. &AUTO. CLS. SIGNAL FOR 4KV GP BUS    251671  00      00 BKR E130      ELECT. DIST. TRIP, INTER. &AUTO CLOSE SIG. FOR 4KV VITAL        251672  DO      00 BUS BKR E130      ELECT. DIST. TRIP. INTER. &AUTO CLOSE SIG. FOR 4KV VITAL        251672  00      00 BUS BKR E130      ELECT. DIST. TRIP. INTRE. & AUTO  CLOSE SIG. FOR 4KV VITAL      251672  00      00 BUS BKR E110      INTERL &TRIP SIGNAL FOR 500KV SWITCHER 2T60                    251673  00      00 E140      ELEC. DISTRIBUTION BKR. LOGIC (BELOW 4KV GP I=l,11)            251674  OD      OD E140      ELEC. DISTRIBUTION BKR. LOGIC (BELOW 4KV GP I=l, 11)            251674  00      00 E130      ELEC. DIST. TRIPPING SIGNAL FOR 4KV BKR. (GP I=l, 11)          251675  00      00 E130      ELECT. DIST. TRIPPING SIGNAL FOR 4KV BKR. (GP I-1.11)          251675  00      00
* E130      ELECT. DIST. TRIPPING SIGNAL FOR 4KV BKR. (GP I=l, 11)          251675  00      00
 
----------                                                                              --                    ---
Page No. 113 11/28/89.
SALEM SIMULATOR Simulator Design Database
* Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                            DRAWING    REVISION  11/01/89
      ------    ============================================================    -------    ========  ========
E130      ELEC. DISTRIBUTION TAP CHANGER LOGIC                            251676    OD        00 E13D      SIM DWG. FOR TAP CHANGER OF TAP CHANGING TRANSFORMERS          251677      00        00 HWDO      DISC (DETECTOR CONTROL) FLUX MAPPING SYSTEM                      251678    OD        DD HWDO      PANEL LETTER 'DETECTOR A' FLUX MAPPING SYSTEM                    251679    DO        DO Hl~OO      PANEL LETTER 'DETECTOR B' FLUX MAPPING SYSTEM                  251680    OD        00 HWOO      PANEL LETTER "DETECTOR C' FLUX MAPPING SYSTEM                    251681    DD        OD HWOO      PANEL LETTER 'DETECTOR D' FLUX MAPPING SYSTEM                    251682    DD        DO HWOD      PANEL LETTER 'DETECTOR E' FLUX MAPPING SYSTEM                  251683      DD        DD HWOD      PANEL LETTER 'DETECTOR F' FLUX MAPPING SYSTEM                    251684    OD        OD
* E5DD E50D E5DD ELEC. GEN. DETAIL DESIGN GEN. EXCITER FIELD BKR LOGIC ELEC. GEN. DETAIL DESIGN EXCITATION PROTECTION ELEC. GEN. ENERGIZATION OF GEN. LOCKOUT BACKUP SHDWN LOCKOUT 251685 251686 251687 01 00 Dl 01 00 01 E5DO      ELEC. GEN. DETAIL DESIGN VOLTAGE REGULATOR LOGIC                251688    D1        01 E580      ELEC. GEN. VOLTAGE ADJUSTER LOGIC &BASE ADJUSTER LOGIC          251689      DD        DO E5DO      ELEC. GEN. DETAIL DESIGN MANUAL CONTROL OF EXCITATION            251690    00        00 E500      ELEC. GEN. DETAIL DESIGN AUTO CONTROL OF EXCITATION            251691      DD        DO E500      ELEC. GEN. DETAIL DESIGN EXCITER MODEL                          251692      DO        DO E580      ELEC. GEN. DETAIL DESIGN TURBINE GENERATOR SPEED MODEL          251693    00        OD E500      ELEC. GEN. DETAIL DESIGN GENERATION POWER                      251694    00        00 E3DO      DIESEL GEN. DETAIL DESIGN START/STOP CONTROL                    251695    02        02 E300      DIESEL GEN. DETAIL DESIGN STOP/START CONTROL                    251695    02        02 E30D      DIESEL GEN. DETAIL DESIGN LOGIC FOR DIESEL TROUBLES            251696    01        Dl
* E30D      DIESEL GEN. ENERGIZATION OF DUTR DIESEL READY TO LOAD          251697    01        01
* Page No.
11/28/89 1a SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
                ============================================================            ======== ========
E300      DIESEL GEN. DETAIL DESIGN DIESEL GEN. EXCITER &GOVERNOR        251698  00      00 CONTROL E300      DIESEL GEN. DETAIL DESIGN DIESEL GEN. EXCITER &GOVERNER        251698 CONTROL E300      DIESEL GEN. DETAIL DESIGN DIESEL GEN. EXCITER &GOVERNOR        251698 CONTROL
                                                                                                          /
E300      DIESEL GEN. DETAIL DESIGN &DIESEL GEN. MECHANICAL MODEL        251699  00      00 E300      DIESEL GEN. DETAIL DESIGN, DIESEL GEN. POWER PANEL              251700  00      00
* E300      DIESEL GEN. DETAIL DESIGN, DIESEL GEN. POWER PANEL              251700 E300      DIESEL GEN. DETAIL DESIGN, DIESEL GEN. POWER PANEL              251700 E400      GAS TURB. GEN. 13 DETAIL DESIGN LOCKOUT RELAY ENERGIZATION      251701  01      01 E400      GAS TURB. GEN. tt3 DETAIL DESIGN START/STOP ENGINE              251702  01      01 E400      GAS TURB. GEN. 13 AUTO CONTROL EXCITATION &GOVERNOR CONTROL    251703  01      01 E400      GAS TURB. GEN. 13 DETAIL DESIGN EXCITATION MANUAL CONTROL      251704  01      01 E400      GAS TURB. tt3 DETAIL DESIGN GEN. MECHANICAL MODEL              251705  01      01 E400      GAS TURB. GEN. 13 DETAIL DESIGN GEN. VOLTAGE CALCULATION        251706  00      00 E400      GAS TURB. GEN. 13 DETAIL DESIGN GEN. POWER MODEL                251707  00      00 HWOO      PANEL, BLANK FLUX MAPPING SYSTEM                                251708  00      00 HWOO      BLANK PANEL 13 RADIATION MONITORING SYSTEM                      251709  OD      00 HWOO      BLANK PANEL 14 RADIATION MONITORING SYSTEM                      251710  00      00 HWOO      CIRCUIT BREAKER PANEL RADIATION MONITORING SYSTEM              251711  00      00
* HWOO HWOO Hl~OO CIRCUIT BKR PANEL WITH METER RADIATION MONITORING SYSTEM CIRCUIT BREAKER SHIELD RADIATION MONITORING SYSTEM RECORDER PANEL, 236A CABINET RADIATION MONITORING SYSTEM 251712 251713 251714 00 00 00 00 00 00 I __ ~HWOO-      ANNUNCIATOR PANEL, 236B CABINET RADIATION MONITORING SYSTEM    251715  00      00
* Page No.
11/28/89 115 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION    LOAD SYSTEM    TITLE                                                          DRAWING REVISION . 11/01/89
  ------    ============================================================    ------- ========  ========
HWOO      CONNECTOR PANEL, 236A CABINET RADIATION MONITORING SYSTEM      251716  00        DO HWOO      BLANK PANEL 236A CABINET RADIATION MONITORING SYSTEM            251717  OD        DO HWOO      BLANK PANEL tt2 236B CABINET RADIATION MONITORING SYSTEM        251718  00        OD H~JOO    ASSEMBLY RAD MON SYS CAB, CAB 236A/236B &I/O CAB 100            251719  DO        DO HWOO      AIR FILTER PANEL RADIATION MONITORING SYSTEM                    251720  DO        DO EHD      ELECT PWR DIST SYS,1 LINE DIAGRAM 460V GROUP &VITAL BUS        251721  DO        DO E140      ELECT PWR DIST SYS, 1 LINE DIAGRAM 460V GROUP &VITAL BUS        251721  DO        DO
* EHO E130 E220 ELECT PWR DIST SYS, 1 LINE DIAGRAM 460V GROUP &VITAL BUS ELEC. 1 LINE DIA. 500KV SW YARD, 13KV SW GEAR, 4160V, VITAL BUS ELEC. POWER DIST. SYS, 1 LINE DIAGRAM - 125V DC 251721 251722 251723 OD DO 00 DO DO DO E153      ELEC. POWER DIST. SYS, 1 LINE DIAGRAM - 115 AC BUSSES          251724  DO        DO HWOO      COVER, RECORDER CUTOUT RADIATION MONITORING SYSTEM              251725  00        DO HWOO      BAR, CUTOUT COVER RADIATION MONITORING SYSTEM                  251726  DO        DO NO DRAWING                                                      251727 NO DRAWING                                                      251728 NO DRAWING                                                      251729 HWOD      PANEL, REACTIVITY COMPUTER                                      251730  OD        OD HWDO      DOOR REACTIVITY COMPUTER PSE&G                                  251731  OD        OD HWDO      SSPS, TRAIN A, NAME TAGS                                        251732  OD        DO
* HWOO HWOO HWOO SSPS, TRAIN A, NAME TAGS SSPS, TRAIN A, NAME TAGS SSPS, TRAIN A, NAME TAGS 251733 251734 251735 DO OD OD DO DO DO HWOO      SSPS, TRAIN A, NAME TAGS                                        251736  OD        DO
* Page No.
11/28/89 116 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================  ------- ======== ========
HWOO      PARTS LIST RADIATION MONITORING SYSTEM                        251737  DD      OD HWOO      PANEL ENGRAVING, REACTIVITY COMPUTER                          251738  DD      DD HWDD      DOOR ENGRAVING REACTIVITY COMPUTER                            251739  OD      00 HWOO      FRAME, TOP COVER (2RP9)                                        251740  DD      00 HWDD      COVER, TOP (2RP9)                                              251741  00      00 HWOO      HINGE, REAR (2RP9]                                            251742  DD      00 HWOD      FRAME, FRONT COVER (2RP9)                                      251743  00      00
* HWOO HWOO HWOO COVER, FRONT (2RP9)
ANGLE, FRONT COVER (2RP9)
HINGE, FRONT (2RP9) 2517U 251745 251746 00 DD OD DO OD DD HWOO      STOP, COVER (2RP9)                                            251747  OD      DO HWDD      COVER FRAME ASSY. (2RP9) PARTS LIST                            251748  DD      00 Hl~OO    COVER FRAME ASSEMBLY (2RP9)                                    251749  OD      DD HWOO      STRIP SPACER (2RP9)                                            25175D  00      OD HWOO      CPU MAINT. PANEL (P25D) (LINK. USE OF SSPS-TRAIN A) FRONT      251751  00      00 VIEW HWOO      CPU MAINT. PANEL (P250) (LINK. USE OF SSPS-TRAIN A) REAR      251752  OD      OD VIEW TlOO      FIGURE 1 BLOCK DIAGRAM OF EHC SYSTEM SIMULATION                251753  00      00 T100      AUTO GV CONTROL (ERROR SECTION)                                251754  01      01
* TlOO      GOVERNOR VALVE DEMAND LIMITER                                  251755  01      01 T100      MANUAL GOVERNOR VALVE CONTROL                                  251756  01      01 TlDO      AUTO GV. CONTROL (DEMAND SECTION)                              251757  01      01 T100      DRIVERS (GV-1,2,3,4)                                          251758  OD      OD
* Page No.
11/28/89 117 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
TlOO      DRIVERS (TV.1,2,3,4 RHSV(1-6), IV(l-6)                          251759  DO      00 T100      SPEED LOAD CHANNELS CHECKOUT                                    251760  01      01 T100      TURBINE OVERSPEED PROTECTION CONTROLLER                        251761  01      01 TlDO      MODE SELECTION (AUTO-MANUAL, GO-HOLD, OFF-ON TEST)              251762  01      01 T100      BUMPLESS TRANSFER IMP. PRESS IN-OUT                            251763  01      Dl T100      TURBINE TRIP SYSTEM                                            251764  Dl      01 T100      TURBINE EHC STOP &GOVERNOR VALVES TEST                          251765  DO      00
* T100 HWOO SALEM SIMULATOR HEAT BALANCE TURBINE EHC REHEAT &INLET VALVES TEST SOLID STATE PROTECTION SYSTEM RACK ASSEMBLY 251766 251767 251768 DO DO DO DO DO OD HWOO      PARTS LIST SSPS RACK (PSE&G)                                    251769  DO      DO HWOO      HINGE MODIFIED RACTIVITY COMPUTER PSE&G                        251770  DO      DO HWOO      HINGE ASSEMBLY REACTIVITY COMPUTER PSE&G                        251771  OD      00 HWOO      BRACKET, HINGE MOUNTING REACTIVITY COMPUTER PSE&G              251772  OD      00 HWOD      2RP8 ASSEMBLY                                                  251773  DO      DO HWOO      RECORDER CONSOLE 2RP8 PARTS LIST                                251774  0        0 HWOO      INSTRUCTORS CONSOLE ASSEMBLY                                    251775  00      DO HWOO      INSTRUCTORS CONSOLE PARTS LIST                                  251776  DO      00 ZSOV01 - EAI PANEL ITEM B505                                    251777  00      DO
* ZSOVDl - EAI PANEL ITEM B505                                    251777  OD      DO ZSOV01 - EAI PANEL ITEM B505                                    251777  OD      OD ZSOVOl - EAI PANEL ITEM B505                                    251777  DO      OD ZSOVOl - EAI PANEL ITEM B5D5                                    251777  00      OD
 
                                                                                            ------~-    - - - - -
1
* Page No.
11/28/89 118 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION    LOAD SYSTEM    TITLE                                                          DRAWING REVISION  11/01/ 89
  ------    ============================================================    ------- ========  ========
R600      ZSOV02(A) - EA! PANEL ITEM B513                                251778  00        00 ZSOV02(B) - EA! PANEL ITEM A005                                251779  00        00 ZSOV02(C) - EA! PANEL ITEM B236                                251780  00        00 ZSOV02(D) - EAI PANEL ITEM B102                                251781  00        00 N400      ZSOV02(E) - EA! PANEL ITEM B244                                251782  00        00 ZSOV03(A) - EAI PANEL ITEM 8313                                251783  00        00 ZSOV03(A) - EA! PANEL ITEM B313                                251783  OD        OD
* ZSOV03(A) - EAI PANEL ITEM B313 ZSOV03(8) - EA! PANEL ITEM CGOl ZSOV03(C) - EA! PANEL ITEM 8116 251783 251784 251785 00 00 00 OD 00 00 ZSOV04 - EA! PANEL ITEMS AG06, AG07, AG08, CNTMT HEPA FILTER    251786  00        00 ZSOV04 - CONTAINMENT HEPA FILTER SELECTION                      251787  00        00 ZSOV04 - CONTAINMENT HEPA FILTER SELECTION                      251788  01        01 G216      ZSOV05(A) -* EAI PANEL ITEM CPOl                                251789  00        00 ZSOV05(8) - EAI PANEL ITEM ADOl, AD02                          251790  00        00 M940      ZSOV05(C] - EAI PANEL ITEM AG09                                251791  00        00 M940      ZSOV05(D) - EA! PANEL ITEM AB14                                251792  00        00 F700      ZSOV05(E) - EA! PANEL ITEM B523                                251793  OD        00 F700      ZSOV05(F) - EA! PANEL ITEM 8505                                251794  00        00
* N210      ZSOV05(G) - EA! PANEL ITEM A608 COMP. COOL. SURGE TK VENT      251795  01        01 VALVE ZSOV05(H) - EA! PANEL ITEM CPlO                                251796  00        00 ZSOV06(A) - EA! PANEL ITEM B319                                251797  00        00 ZSOV06(B) - EA! PANEL ITEM BllO                                251798  00        00
* Page No.
11/28/89 119 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
                ============================================================            ======== ========
ZSOV06(C) - EAI PANEL ITEM B201                                251799  00      OD ZSOV06(D) - EAI PANEL ITEM B252                                251800  00      DD ZSOV06(E) - EAI PANEL ITEM AOD2                                251801  DO      DD ZSOVD6[F) - EAI PANEL ITEM A004                                251802  DD      00 ZSOV06(G) - EAI PANEL ITEM B257                                251803  01      01 ZSOV07(A) - EAI PANEL ITEM A006                                251804  01      01 ZSOVD7(B) - EAI PANEL ITEM AOD6                                251805  01      01
* ZSOVD7(C) - EAI PANEL ITEM AN01 ZSOVD7(D) - EAI PANEL ITEM AED4, 1409, 1802 ZSOV08(A) - EAI PANEL ITEM A004 251806 251807 251808 OD 01 01 DD 01 01 G216      ZSOV08[B) - EAI PANEL ITEM CP14                                251809  01      01 ZSOVD8(C) - EAI PANEL ITEM B122                                251810  01      01 ZSOV08[D) - EAI PANEL ITEM B257                                251811  01      01 G216      ZSOV08(E) - EAI PANEL ITEM CP10                                251812  01      01 ZSOV09[A) - 23 AUX. FEED PUMP EAI PANEL ITEM 8514              251813  02      02 G210      ZSOV09[B) - EAI PANEL ITEM CF07                                2518H  01      01 N400      ZSOV09[C) - EAI PANEL ITEM B241                                251815  OD      00 F700      ZSOV1D(A) - l[FIRST IN LOOP) 21, 22 STM GEN FEED PMP RESET      251816  01      01 F700      ZSOVlD[A) - 2[FIRST IN LOOP) 21, 22 STM GEN FEED PMP TRIP      251817  01      01 RELAY I
* F700      ZSOV10(A) - 2(FIRST IN LOOP) 21,22 STM GEN FEED PMP TRIP RELAY 251817 l___ -
I    F700      ZSOV10(B) - EAI PANEL ITEM 8524, 8616                          251818  00      00 F700 - -  ZSO~O(B) ~~!    PANEL HEM 8521, 8616 251818
 
                                                                                                      --
* Page No. 120 11/28/89 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
ZSOV11(A] - EAI PANEL ITEM CK03                                251819  00      OD ZSOV11(B] - EAI PANEL ITEM CM02                                251820  DD      DD ZSOV11(B) - EAI PANEL ITEM CMD2                                251820  DO      DD ZSOV11(C) - EAI PANEL ITEM CM01                                251821  DO      DD ZSOV11(C) - EAI PANEL ITEM CM01                                251821  DD      OD ZSOV12(A) - EAI PANEL ITEM CMDl                                251822  OD      OD ZSOV12(A) - EAI PANEL ITEM CMOl                                251822  DO      DO
* ZSOV12(B) - EAI PANEL ITEM CMOl ZSOV12(8) - EAI PANEL ITEM CMOl ZSOV13(A) - EAI PANEL ITEM A009 251823 251823 251824 DD DD DO DD DD DO ZSOV13(B) - EAI PANEL ITEM AD03                                251825  00      DD G216      ZSOV13(C] - EAI PANEL ITEM 8607                                251826  DD      DD G216      ZSOV13(C) - EAI PANEL ITEM 8607                                251826  DD      DD G216      ZSOV13(D) - EAI PANEL ITEM CP11                                251827  DD      DD ZSOV13(E) - EAI PANEL ITEM 8522                                251828  DO      DO F500      ZSOV14(A) - EAI PANEL ITEM B535                                251829  DD      DO ZSOV14(B) - EAI PANEL ITEM CKD4                                251830  DO      DD G220      ZSOV15(A] - 21, 22, 23 MSR LP AUTO/MAN SELECTION                251831  OD      DD G220      ZSOV15(B] - MAIN STEAM REHEAT SYS, RELAY 2-2/IPV                251832  OD      DO ZSOV15(C] - MAIN STEAM REHEAT SYS, RELAY 2-1/IPV                251833  OD      DO
* G220 G220      ZSOV15(D) - (CJ06] VLV 21/22RD93 REHEAT STM SYS, BLEED STM    251834  OD      DO VENT G220      ZSOV15(E) - (CJ08] MSR REHEAT LP STOP, VLV 21,22,23MS63 &      251835  DD      DO 21,22,23MS67
* Page No.
11/28/89 121 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  . LOAD SYSTEM    TITLE                                                          DRAWING  REVISION  11/Dl/89
  ------    ============================================================    ------- ========    ========
G22D      ZSOV15(F) - VLV 21,22,23MS65 &21,22,23MS69 REHEAT STEAM        251836  DD        DO LP PURGE VALVE ZSOV15(G) - EAI PANEL ITEM CJ08 - 21,22,23 LP CONDENSER        251837  OD          DO VALVES G210      ZSOV16(A) - VLV 21-24MS169 MAIN STM ISO TRIP STM VENT MS167S    251838 ' 01          01 G210      ZSOV16(B) - 3 POS MAINT.VENT VLV FOR STOP VLV (2RP5)            251839  OD          DD 21-24MS16 G21D      ZSOV16(C) - PNL ITEM BDOl, CGOl VLV 21-24MS167 MAIN STM STOP    251840  01        01 VALVE
* G210 F700 ZSOV16(C) - PNL ITEM BD01, CGOl VLV 21-24MS167 MAIN STM STOP VALVE ZSOV17(A) - SGFPT RECIR VLV 21BF32 &22BF32 ZSOV17(B) - TURBINE DRAIN VALVES 251840 251841 251842 D1 OD 01 01 OD 01 ZSOV17(B) - TURBINE DRAIN VALVES                                251842 ZSOV17(C) - DEMIN. WTR. LINE TO SURGE TK INLET VLV. 2DR1D7,    251843  01        Dl 2DR29 ZSOV17(D) - SGFPT OIL PUMP TEST VALVES (B519)                  251844  01        01 ZSOV17(E) - CONDENSATE RECIRCULATION VALVES 21-23CN8            251845  DO        DO ZSOV17(F) - VALVE 2SW191 SERVICE WATER VALVE FOUD IN MESS      251846  OD        00 ZSOV17(G) - SW VALVE 2SW169                                    251847  OD        DO ZSOV17(G) - SW VALVE 2SW169                                    251847 ZSOV17(H) - 2GB24 (LOCAL VALVE)                                251848  DO        DO
* ZSOV17(I) - FP AUX STEAM SUPPLY INLET VALVE 2HS1                251849  01        01 TlOD      TURBINE E-H CONTROL PANEL #2                                    25185D  DO        OD ZMOTOl - 21, 22 RHR PUMPS                                      251851  DO        DO ZMOT02 23 CONDENSATE PUMPS                                251852  OD        OD
 
--------------            ----~---        -- -----------~----------~---~-~--...,
* Page No. 122 11/28/89 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
    ------    ============================================================    ------- ======== --------
                                                                                                --------
ZMOTD3 23 COMPONENT COOLING WATER PUMP                    251853  DO      DD ZMOTD4 23 HEATER DRAIN PUMPS                              251854  DD      DO T800      ZMOT05 - 21A/B, 22A/B, 23A/B CIRCULATORS                        251855  00      DD T800      ZMOT05 - 21A/B, 22A/B, 23A/B CIRCULATORS                        251855  00      00 T800      ZMOTD5 - 21A/B, 22A/B, 23A/B CIRCULATORS                        251855  00      DO M600      ZMOTD6 26 SERVICE WATER PUMPS                              251856  00      00 M600      ZMOTD6 26 SERVICE WATER PUMPS                              251856  00      DO
* M60D      ZMOT06 26 SERVICE WATER PUMPS ZMOT07 - 21 22 23 AUX. COOLING PUMPS ZMOT08 - 21 22 CONTAINMENT SPRAY PUMPS 251856 251857 251858 00 DO 00 DO 00 00 ZMOT08 - 21 22 SAFETY INJECTION PUMPS                          251859  00      00 NlOO      ZMOTD9 - 21 AND 22 CHARGING PUMPS                              251860  DO      OD NlOO      ZMOT09 - 23 CHARGING PUMP                                      251861  00      00 ZMOTll(A) - BORIC ACID TRANSFER PUMP                            251862  00      00 ZMOT11(B) - 21, 22 PRIMARY WATER PUMPS                          251863  00      00 M940      ZMOT12 25 CONTAINMENT FAN COIL UNITS                      251864  00      00 M940      ZMOT12 25 CONTAINMENT FAN COIL UNITS                      251864 M940      ZMOT12 25 CONTAINMENT FAN COIL UNITS                      251864
    ~194D    ZMOT12 25 CONTAINMENT FAN COIL UNITS                      251864
* M922      ZMOT14(A) - FUEL HANDLING AREA SUPPLY FAN                      251865  OD      OD M922      ZMOT14(B) - 21, 22 FUEL HANDLING AREA VENT EXHAUST FANS        251866  DO      00 F30D      ZMOT15 - 21A-22B SGFPT TURBINE AND 21-22 EMERGENCY OIL PUMP    251867  00      DO F3DO      ZMOT15 - 21A-22B SGFP TURBINE AND 21-22 EMERGENCY OIL PUMP      251867
* Page No. 123 11/28/89 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
ZMOT16(A) - 21, 22 IODINE REMOVAL FANS                          251868  DO      DO M%0      ZMOT16(B) 24 ROD DRIVE VENT FAN                            251869  DO      DO M910      ZMOT16(C) - AUX. BLDG. SUPPLY AND EXHAUST FANS                  251870  00      OD M910      ZMOT16(C) - AUX. BLDG. SUPPLY AND EXHAUST FANS                  251870 M940      ZMOT16(D) 24 RX NOZZLE SUP. VENT FAN, 21-22 SHIELD VENT    251871  00      00 FAN ZMOT17 - 21,22 CONDENSATE TRANSFER PUMPS                        251872  00      00
* F320      ZMOT17 - 22,23,24,25 VACUUM PUMPS                              251873  OD      00 F320      ZMOT17 - 22,23,24,25 VACUUM PUMPS                              251873  DO      00 ZMOT17 - 21,22 BSCDT PUMPS                                      251874  00      00 F400      ZMOT18 - AFWT HEATER PUMP                                      251875  00      00 G216      ZMOT18 - BLOWDOWN TRANSFER PUMP                                251876  OD      DO ZMOT18 - 21,22 TURBINE HYDRAULIC PUMPS                          251877  OD      OD ZMOT18 - 21,22 STATOR COOLING WATER PUMPS                      251878  DO      DO T500      ZMOT19 - HP SEAL OIL BACKUP PUMP, AUXILIARY OIL PUMP,          251879  DO      OD BEARING OIL HYDRAULIC LIFT PUMP, EMERGENCY AIR SIDE SEAL PUMP AND EMERGENCY BEARING OIL PUMP.
ZMOT20 - 21,22 SGFPT TURNING GEAR                              251880  00      OD ZMOT20 - 21,22 SGFPT OIL TANK VAPOR EXTRACTOR                  251881  00      DO ZMOT20 - RSWT HEATER PUMP                                      251882  OD      DO ZMOT21 - REACTOR COOLANT PUMPS, OIL LIFT PUMPS                  251883  DO      OD
* MCOO MCOD MCOO ZMOT13 - SHEET 1, STATION AIR COMPRESSORS ZMOT13 - SHEET 2, tt2 EMERGENCY AIR COMPRESSORS ZMOT13 - SHEET 3, AIR COMPRESSOR LOADING SEQUENCE 251884 251885 251886 01 01 DO 01 01 DO MCOO      ZMOT13 - SHEET, 4 AIR COMPRESSOR LOADING SEQUENCE              251887  OD      DO
* Page No. 12~
11/28/89 SALEM SIMULA TOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
ZMOT22(A) - MAIN TURBINE TURNING GEAR                          251888  DO      DD ZMOT22(B] - 21 &22 RCDT PUMPS                                  251889  DO      DO ZMOT22(C) - WASTE GAS COMPRESSOR                                251890  01      01 ZMOT22(D) - CONTAINMENT SUMP PUMPS                              251890  DO      OD R130      SAFEGUARD EQUIPMENT CONTROL                                    251891  01      01 R130      SAFEGUARD EQUIPMENT CONTROL                                    251891  01      01 R130      SAFEGUARD EQUIPMENT CONTROL                                    251891  01      01
* R130 R130 R130 SAFEGUARD EQUIPMENT CONTROL SAFEGUARD EQUIPMEMT CONTROL SAFEGUARD EQUIPMENT CONTROL 251891 251891 251891 01 01 01 01 01 01 R130      SAFEGUARD EQUIPMENT, CONTROL PANEL INDICATION                  251892  DO      00 R130      SAFEGUARD EQUIPMENT, CONTROL PANEL INDICATION                  251892  00      DO R130      SAFEGUARD EQUIPMENT, CONTROL PANEL INDICATION                  251892  00      00 R130      SAFEGUARD EQUIPMENT, CONTROL PANEL INDICATION                  251892  DO      OD R130      SAFEGUARD EQUIPMENT, CONTROL CONSOLE INDICATION                251892  00      00 R130      SAFEGUARD EQUIPMENT, CONTROL CONSOLE INDICATION                251892  00      00 R130      MANUAL SAFEGUARD ACTUATION                                      251893  00      00 R130      MANUAL SAFEGUARDS ACTUATION                                    251893  00      DO R130      MANUAL SAFEGUARRDS ACTUATION                                    251893  OD      DD MANUAL SAFEGUARDS ACTUATION                                    251893  DO      DO
* R130 R130      MANUAL SAFEGUARDS ACTUATION                                    251893  00      00 R130      MANUAL SAFEGUARDS ACTUATION                                    251893  OD      OD R120      MANUAL SAFEGUARDS ACTUATION                                    2518%  OD      OD
* Page No.
11/28/89 125 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
    ------    ============================================================  ------- ======== ========
R120      MANUAL SAFEGUARDS ACTUATION                                    251894  OD      00 R120      MANUAL SAFEGUARDS ACTUATION                                    251894  00      00 R120      MANUAL SAFEGUARDS ACTUATION                                    251894  00      00 R120      MANUAL SAFEGUARDS ACTUATION                                    251894  00      00 R120      MANUAL SAFEGUARDS ACTUATION                                    251894  00      00 SSPS TEST CASE 'A' MOMENTARY CONTACT PLUS BLOCKING            251895  00      00 SSPS-TEST CASE 'B' MAINTAINED CONTACT PLUS BLOCKING            251896  00      00
* SSPS TEST CASE 'c" MOMENTARY CONTACT NO BLOCKING SSPS TEST CASE 'D' MAINTAINED CONTACT NO BLOCKING ZMSC01 - BORIC ACID BLENDER MODE SELECTION 251897 251898 251899 00 00 01 00 OD 01 ZMSC01 - BORIC ACID BLENDER MODE SELECTION                    251899  01      01 ZMSC02(A) - PRESSURIZER BACKUP HEATERS                        251900  00      00 ZMSC02(A) - PRESSURIZER BACKUP HEATERS                        251901  00      00 ZMSC02(B) - PRZR HTR. CONTROL GROUP EAI PANEL ITEM 6220        251902  01      01 ZMSC11(A) - RELAY 69/lSC 'SET', 21-23LP STARTUP COMPLETE      251903  00      00 ZMSC11(B) - RELAY 43/MTGT ENERG., 21-23 TURB INLET TEMP} 300  251904  00      00 T100      ZMSCll(C) - RELAY 33X/GV DE-ENERGIZED GOV. VALVES CLOSED      251905  00      00 ZMSCll(D) - CONTAINMENT SUMP LEVEL INDICATION LIGHTS          251906  00      00 ZMSCll(F) - CNMNT LIGHTING 3-POS SW, ACCESS HATCH LIGHTS      251907  00      00 251908  DO      00
* ZMSC11(G) 25 CONDENSATE SHUTOFF VLV 21-25WD50 ZMSC12[A) - MISC. LOGIC RELAY WR1                              251909  01      01 ZMSC12(B) - MISC. LOGIC ADDITIONAL CMC'S (ZMOV01, ZMOV07)      251910  00      OD ZMSC12[C) - MISC. LOGIC                                        251911  01      01 L _______
* Page No. 126 11/28/89 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
ZMSC12(D) - MISC. LOGIC RELAYS SDX11, SDX12, &SDX13            251912  00      00 ZMSC12(E) 24 SERVICE WATER VENT FANS                      251913  01      01 5801,5802,5803,5804 ZMSC12(F) - RMS BYPASS SWITCHES (2RP1)                          251914  00      DO ZMSC12(G) - 21 &22 REGULAR &BAKEUP CONTAINMENT SAMPLE          251915  00      OD INLET & OUTLET ISOLATION VALVES ZMSC12(H) - CONT. VENT. ISOL. TRAINS A&B                        251916  DO      DO ZMSC12[I) - HI RAD IN FUEL HAND. BLDG. HORN ACK. EA!            251917  01      01
* PNL.1814 M910      ZMSC13(B) - MISC. LOGIC 21 EMERG SUPPLY FAN EAI PNL 2210        251918  OD      DO ZMSC13(C) - MISC. LOGIC 21 CHILLED WATER PMPS EAI PNL 2217      251919  DO      00 ZMSC13(A) - MISC. LOGIC TURB. BLDG. EAST SUPPLY FAN EAI PNL    251920  00      00 2402 ZMSC13(D) - MISC. LOGIC 21 CHILLER STATUS EAI PNL ITEM 2213    251921  00      DO ZMSC13(E) - MISC. LOGIC 21 OUTER PENET. EXH. FAN EA! PANEL      251922  01      01 2118 ZMSC13[F) - MISC. LOGIC 21 CHARGING PMP ROOM COOL. EAI PNL      251923  OD      DO 22D1 ZMSC13(G) - MISC. LOGIC AUX. FW. PMP. ROOM COOL. EAI PNL        251924  DO      DO 21D8 M921      ZMSC13(H) - CONTROL ROOM INTAKE DUCT ISOL. TRAIN 'A &B'        251925  01      01 ZMSC13(I) - MISC. LOGIC ~21  PENET. AREA EXH. FAN EAI PNL.      251926  DO      00 ITEM 2116 00
* M921      ZMSC13(J) - MISC. LOGIC 21 CONTROL ROOM AIR COND FANS EAI      251927          DO PIN 2207 ZMSC13(K) - MISC. LOGIC CHILLED WTR ISOL. VLV 2CH30 EAI PIN. 251928  00      DO 2221 ZMSC13(L) - MISC. LOGIC ~21 SWGR ROOM SUPPLY FANS EAI PNL      251929  DO      00 2101
* Page No. 127 11/28/89 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
ZMSC13(M) - MISC. LOGIC tt21 SWGR ROOM EXHAUST FAN EAI PNL      251930  DO      00 2105 M921      ZMSC13(0) - MISC. LOGIC DAMPERS CONTROL 2RP2 EAI PNL ITEM      251931  01      01 2513 M921      ZMSC13(P) - LOGIC PNL 2301, 2314, 2312, 2310, 2316, 2308,      251932  DO      OD 2303 M921      ZMSC13(P) - MISC. LOGIC DAMP. CNTRL 2RP2, 2CAA2 EAI PNL 2306    251933  DO      OD M921      ZMSC13(P) - MISC. LOGIC DAMP. CNTRL 2CAA19, 2CAA4, 2CAA5        251934  00      00
* M921      ZMSC13(P) - MISC. LOGIC EAI PNL ITEM 2301, 2309, 2311, 2302    251935  DO      OD ZMSC13(P) - MISC. LOGIC EAI PANEL ITEM 2317                    251936  DO      DO ZMSC13(Q) - MISC. LOGIC 23 OUTER PENET. EXH. FAN EAI PNL        251937  01      01 2215 GOVERNOR VALVE DEMAND LIMITER                                  251938  01      01 TlOO      TURBINE STOP &GOVERNOR VALVES TEST                              251939  DO      OD TlOO      TURBINE EHC REHEAT &INLET VALVES TEST                          251940  DO      OD ZMOVOl(A) - VLV TAG 2CS14 CONT. SPRAY ADD. TK. DISCH. VLV.      251941  00      00 ZMOVOl(A) - VLV TAG 2CS14 CONT. SPRAY ADD. TK. DISH. VLV        251941  00      00 ZMOVOl(A) - VLV TAG 2CS14 CONT. SPRAY ADD. TK. DISH. VLV        251941  DO      OD ZMOVOl(A) - VLV TAG 2CS14 CONT. SPRAY ADD. TK. DISH. VLV        251941  DO      00 ZMOVOl(A) - VLV 2SJ4 BORON INJ TK INLET VLV EAI PNL ltAH09      251942  DO      DO F500      ZMOVOl(B) - VLV 21BF13 FW INLET STOP VLV EAI PNL ITEM BD01      251943  00      DO ZMOVOl(C) - VLV TAG 2CV140 CHG. DISCH. TO SW HX                2519H  01      01
* ZMOV02 - VLV 21CN79, 21A COND. HOTWELL ISOL VLV EAI PNL CK15 ZMOV02 - VLV 21CN79, 21A COND. HOTWELL ISOL VLV EAI PNL CK15 ZMOVD2 - VLV 21CN79, 21A COND. HOTWELL ISOL VLV EAI PNL CK15 251945 251945 251945 00 DO DO 00 00 OD
* Page No.
11/28/89 128 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/Dl/89
  ------    ============================================================    ------- ======== ========
ZMOV03(A) - VLV TAG 2CV116 SEAL WTR TO VCT EAI PNL ITEM 8103    251946  DO      OD ZMOVD3(B) - VLV 2SW26 TURB. AREA SW HEADER EA! PNL ITEM A913    251947  00      OD ZMOV03(C) - 2CC190 RCP THERMAL BARRIER DISCH EA! PNL A616      251948  OD      00 ZMOV04(A) - VLV 21CW26 21A COND. WTR. OUTLET VLV PANEL CMDl    251949  DD      DO T800      ZMOV04(B) - VLV 21CW9 CIRC. BYPASS VLV PANEL CMOl              251950  00      00 T8DD      ZMOV04(B) - VLV 21CW9 CIRC. BYPASS VLV PANEL CMOl              251950  DO      00 ZMOV05(A) - VLV 21CN108 COND. POLISH BYPASS VLV EA! PNL CHD6    251951  DO      00
* N22D ZMOV05[B) - VLV 2CN109 21 CNDS PMP&CNDS POLISH INFLUENT VLV ZMOVD5[C) - 2RH1 RHR COMMON SUCTION VLV EA! PNL AA07 ZMOV06[A) - 21RH29 21RHR PMP BYPASS VLV EA! PNL AA13 251952 251953 251954 00 00 00 00 OD DO ZMOVD6(B) - VLV TAG 2SJ1 RWST TO CHG PMP EAI PNL ITEM B1D3      251955  00      OD ZMOVD6(C) - VLV 2CV40 eves FIRST DISCH. STOP VLV EAI PNL        251956  DO      DO B1D1 ZMOV06(D) - VLV TAG 2CC131 EAI PNL ITEM A615                    251957  00      00 ZMOV07 - VLV TAG 2SJ69 RWST SUCTION VLV EAI PANEL ITEM AA08    251958  00      00 ZMOV07 - VLV TAG 2SJ69 RWST SUCTION VLV EAI PANEL ITEM AA08    251958  00      00 ZMOV07 - VLV TAG 2SJ69 RWST SUCTION VLV EA! PANEL ITEM AAD8    251958  DO      OD ZMOV07 - VLV TAG 2SJ69 RWST SUCTION VLV EAI PANEL ITEM AAD8    251958  00      DO ZMOVD8[A) - 21RH19 21 RHX CROSS DISCH VLV EAI PNL AA10          251959  OD      OD ZMOVD8(B) - VLV TAG 21RH4 RHR PMP SUCTION VLV EAI PANEL AAD5    251960  00      00
* ZMOV08(C) - 21CS36, FROM 21 RHX CONT. SPRAY (1-13) 21 RECIRC VALVE ZMOVD8(D) - 21SJ45, RECIRC. ISOL. VLV TO SI PMPS EAI PNL AH15 251961 251962 00 DO 00 00 ZMOV08(E) - VLV 21AR65, 22AR65, 23AR65, COND. VAC. BRK. VLV. 251963  01      Dl PIN CKD6
* Page No. 129 11/28/89 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
ZMOV09(A) - 21SJ49 RHR PMP DISCH. ISOL. VLV. EAI PNL AA10,      251964  DO      DO 4004 ZMOV09(B) - 21SJ44 RHR (1-15) 21 !SOL. SIS SUMP VLV            251965  OD      00 ZMOVlO(A) - 2PR6 PZR RELIEF  STO~ VLV EAI PNL ITEM 8201, ANOl  251966  01      01 ZMOV10(B) - 2SJ67, SAFETY INJ. FOUR VLV 7.2 MINIFLOW !SOL      251967  00      DO VLV ZMOVlO(C) 23BF7. NO I/O INDICATIONS                        251968  DO      DO C300      OVERHEAD ALARM LOGIC                                            251969  01      01
* C300 C300 C300 CONSOLE ALARM LOGIC CONSOLE ALARM LOGIC CONSOLE ALARM LOGIC 251970 251970 251970 DO
                                                                                    \0 DO OD
                                                                                            \0 DD R130      SAFEGUARD EQUIPMENT CONTROL - SHEET 1                          251971  02      02 SAFEGUARDS EMERGENCY LOADING SEQUENCE - SHEET 2                251972  DO      DO SAFEGUARDS EMERGENCY LOADING SEQUENCE - SHEET 3                251973  DO      DD SAFEGUARDS EMERGENCY LOADING SEQUENCE - SHEET 4                251974  DO      OD SAFEGUARDS EMERGENCY LOADING SEQUENCE - SHEET 5                251975  DO      OD SAFEGUARDS EMERGENCY LOADING SEQUENCE - SHEET 6                251976  DO      00 CHEMICAL &VOLUME CONTROL SYSTEM                                251977  00      00 R500      SUBROUTINE MOTION - BANK &INDIVIDUAL ROD MOTION                251978  00      00 R500      SUBROUTINE MOTION - BANK &INDIVIDUAL ROD MOTION                251978  DO      OD R500      SUBROUTINE MOTION - LIMIT BANK &ROD POSITION                    251979  DO      OD
* R500 R500 SUBROUTINE MOTION - LIMIT BANK &ROD POSITION SUBROUTINE MOTION - LIMIT ROD POSITION TO BETWEEN 0 &228 STEPS 251979 251980 OD DO OD DO R500      SUBROUTINE MOTION - LIMIT ROD POSITION TO BETWEEN 0 &228        251980  DO      OD STEPS
* Page No.
11/28/89 130 SALEM SIMULA TOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/Dl/89
            ============================================================    ------- ======== ========
R500      SUBROUTINE SHTDWN - SHUTDOWN BANKS "C' &'D' INSERTION AND      251981  00      00 WITHDRAWAL R500      SUBROUTINE SHTDWN - SHUTDOWN BANKS 'c' &'D' INSERTION AND      251981  OD      DO WITHDRAWAL R500      CRDSYS - START-UP PUSH BUTTON, ROD CONTROL SYSTEM RESET        251982  00      00 LOGIC R500      CRDSYS - START-UP PUSH BUTTON, ROD CONTROL SYSTEM RESET        251982  00      DO LOGIC R500      CRDSYS - ROD BOTTOM LITES AND OVERHEAD ALARM LOGIC              251983  OD      00
* R500 R500 R500 CRDSYS - ROD BOTTOM LITES AND OVERHEAD ALARM LOGIC CRDSYS - INDIVIDUAL 'CONTROL' BANK SELECT INSERTION OR WITHDRAWAL CRDSYS - INDIVIDUAL "CONTROL' BANK SELECT INSERTION OR 251983 251984 251984 OD DO 00 OD 00 DO WITHDRAWAL R500      CRDSYS - INDIVIDUAL 'SHUTDOWN' BANK SELECT INSERTATION AND      251985  00      DO WITHDRAWAL R500      CRDSYS - INDIVIDUAL 'SHUTDOWN' BANK SELECT INSERTATION AND      251985  00      DO WITHDRAWAL R500      CRDSYS - ROD CONTROL SYSTEM MALFUNCTIONS                        251986  DO      00 R500      CRDSYS - ROD CONTROL SYSTEM MALFUNCTIONS                        251986  DO      DO R500      CRDSYS - GO PULSES FOR SLAVE CYCLERS, BANK AND INDIVIDUAL      251987  DO      00 ROD MOTION. (CALLS TO MASTER, BANKOVR, SHUTDOl~N AND INDIVIDUAL BANKS)
R500      CRDSYS - GO PULSES FOR SLAVE CYCLERS, BANK AND INDIVIDUAL      251987  OD      DO ROD MOTION. (CALLS TO MASTER, BANKOVR, SHUTDOWN AND
* INDIVIDUAL BANKS)
R50D      SUBROUTINE MANMOT - INDIVIDUAL BANK SELECT (CONTROL            251988  DO      OD BNK-A,B,C &D AND SHUTDOWN BNK-A &B)
R50D      SUBROUTINE MANMOT - INDIVIDUAL BANK SELECT (CONTROL            251988  OD      DO BNK-A,B,C &DAND SHUTDOWN BNK-A &B)
 
                                      -------------------------------~--
* Page No. 131 11/28/89 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
R500      SUBROUTINE MANMOT - GO PULSES TO STEP CONTROL AND SHUTDOWN      251989  00      00 BANKS R500      SUBROUTINE MANMOT - GO PULSES TO STEP CONTROL AND SHUTDOWN      251989  00      00 BANKS R500      SUBROUTINE MANMOT - GO PULSES TO STEP CONTROL AND SHUTDOWN      251990  00      00 BANKS R500      SUBROUTINE MANMOT - GO PULSES TO STEP CONTROL AND SHUTDOWN      251990  00      00 BANKS R500      SUBROUTINE MANMOT - GO PULSES TO STEP CONTROL AND SHUTDOWN      251991  00      00
* BANKS R500      SUBROUTINE MANMOT - GO PULSES TO STEP CONTROL AND SHUTDOWN      251991  00      00 BANKS R500      SUBROUTINE MASTER - INCREMENT COUNTER                          251992  00      00 R500      SUBROUTINE MASTER - INCREMENT COUNTER                          251992  00      00 R500      SUBROUTINE MASTER - INCREMENT COUNTER                          251993  00      00 R500      SUBROUTINE MASTER - INCREMENT COUNTER                          251993  00      DO R500      SUBROUTINE MASTER - INCREMENT COUNTER                          251994  00      00 R500      SUBROUTINE MASTER - INCREMENT COUNTER                          251994  00      00 R500      SUBROUTINE BNKOVR - CONTROL BANK OVERLAP COUNTER                251995  00      00 R500      SUBROUTINE BNKOVR - CONTROL BANK OVERLAP COUNTER                251995  00      00 R500      SUBROUTINE BNKOVR - CONTROL BANK OVERLAP COUNTER                251996  00      00 R500      SUBROUTINE BNKOVR - CONTROL BANK OVERLAP COUNTER                251996  00      00 R500      SUBROUTINE BNKOVR - INITIALIZE BANK STEPS                      251997  00      00
* R500 R500 R500 SUBROUTINE BNKOVR - INITIALIZE BANK STEPS SUBROUTINE BNKOVR - GO PULSES TO CONTROL BANKS SUBROUTINE BNKOVR - GO PULSES TO CONTROL BANKS 251997 251998 251998 00 00 DO 00 00 00
* Page No. 132 11/28/89 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
            ============================================================            ======== ========
NODE INDEX - BLEED STEAM &REHEATERS                            251999  DO      00 R100      REACTOR PROTECTION SYSTEM MANUAL/AUTO 6 BUTTON CONTROLER        251???
BOCA01 - 23 FW HEATER LEVEL CONTROLS, DRAINS TO 22 FW HEATER    251???
21,22,23HD30 BOCA01 - 26 FW HEATERS LEVEL CONTROLS, DRAINS TO CONDENSER      251???
21,22,23HD2 BOCAOl - BLEED STEAM DRAIN TANK LEVEL CONTROLS, HIGH LEVEL      251???
CONTROLS, 21 DRAIN TANK 21RD19, 22 DRAIN TANK 22RD19
* BOCA01 - MAIN STEAM REHEAT DRAIN TANK LEVEL CONTROLS, MSR      251???
SHELL SIDE LEVEL CONTROLS, EAST 21,22,23RD33, WEST 21,22,23RD60 BOCAOl - 25 FW HEATERS LEVEL CONTROLS, HEATER DRAIN PUMP        251???
DISCHARGE VALVES 21,22,23HD15 BOCA01 - 22 FW HEATER LEVEL CONTROLS, DRAINS TO 21 FEEDWATER    251???
HEATERS 21,22,23,HD33 BOCAOl - 24 FW HEATERS LEVEL CONTROLS, DRAINS TO CONDENSER      251???
21,22,23HD37 BOCAOl - 24 FW HEATERS LEVEL CONTROLS, DRAINS TO 23 FW          251???
HEATERS 21,22,23HD26 BOCAOl - 22 FW HEATER LEVEL CONTROLS, DRAINS TO CONDENSER      251???
21,22,23HD41 BOCA01 - 21 FW HEATER LEVEL CONTROL VALVES 21,22,23HD35        251???
BOCA01 - MAIN STEAM REHEAT DRAIN TANK LEVEL CONTROLS, MSR      251???
DRAIN TANK HIGH LEVEL CONTROL, EAST DRAIN TANK 21,22,23RD3, WEST DRAIN TANK 21,22,23RD36 BOCAOl - 23 FW HEATERS LEVEL CONTROLS, DRAINS TO CONDENSER      251???
* 21,22,23HD39 BOCAOl - MAIN STEAM REHEAT DRAIN TANK LEVEL CONTROLS, EAST DRAIN TANK 21,22,23RD5, WEST DRAIN TANK 21,22,23RD38 BOCAOl - 26 FW HEATERS LEVEL CONTROLS, DRAINS TO 25 FW 251???
251???
HEATER 21,22,23HD5
* Page No. 133 11/28/89 SALEM SIMULA TOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
            ============================================================            ======== ========
BCOADl - BLEED STEAM DRAIN TANK LEVEL CONTROLS, NORMAL LEVEL    251???
CONTROLS, 21 DRAIN TANK 21,22RD27, 22 DRAIN TANK 21,22RD56 BCOAOl - 25 FW HEATERS LEVEL CONTROLS, DRAINS TO CONDERSER      251???
21,22,23HD9 F400      BOCA02 24 SG AUX FEED WATER INLET VALVES CONTROLS          251???
21,22,23,24AF21. AUX FEED PUMPS PRESSURE OVERRIDE AND PRESSURE OVERRIDE DEFEAT BOCA03 - FEED WATER HEATERS BYPASS CONTROL VALVES 2CN47,        251???
2BF38, 2CN45
* BOCA04 - SERVICE WATER DELTA-P CONTROL VALVES                  251???
BOCA05 - SERVICE WATER PRESSURE REGULATING VALVES.              251???
BOCA06 - SERVICE WATER FLOW CONTROL VALVES, 21-25              251???
CONTAINMENT FAN COIL UNITS VALVES 21-25SW223. 23 CONTAINMENT FAN COIL UNIT WATER FLOW TROUBLE ALARM.
M940      BOCA06 - SERVICE WATER FLOW CONTROL VALVES, 21-25              251 ???
CONTAINMENT FAN COIL UNITS VALVES 21-25SW223. 23 CONTAINMENT FAN COIL UNIT WATER FLOW TROUBLE ALARM.
BOCA07 - LETDOWN HEAT EXCHANGER PRESSURE CONTROL VALVE 2CV18    251???
BOCA07 - FUEL HANDELING BUILDING DIFF PRESSURE CONTROL, 21 &    251 ???
22 FUEL HANDELING BUILDING EXHAUST FAN DAMPERS 2FHV05 &
2FHV06 BOCAOB - TEMPERATURE CONTROL VALVES 21-23MC31, 21-23MC32,      251???
21,22ST35, 21,22SW127.
G220      BOCA09 - MOISTURE SEPERATOR REHEATER TEMPERATURE CONTROL        251???
VALVES 21-23MS64 &21-23MS68 G220      BOCA09 - MOISTURE SEPERATOR REHEATER TEMPERATURE CONTROL        251 ???
VALVES 21-23MS64 &21-24MS68 .
* G220      BOCA09 - MOISTURE SEPERATOR REHEATER TEMPERATURE CONTROL VALVES 21-23MS64 &21-23MS68 BOCAlO - TURB AUX COOLING BYPASS AND H2 COOLER TEMP CONTROLS, BYPASS TEMP CONTROL VALVE 2TC18, H2 COOLERS TEMP 251 ???
251 ???
CONTROL VALVE 2TC221
* Page No. 134 11/28/89 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
            ============================================================    ------- ======== ========
BOCA11 - BORIC ACID AND PRIMARY WATER FLOW CONTROL VALVES      251???
2CV172, &2CV179 F400      BOCA12 - 23 AUX FEED PUMP SPEED CONTROL ( VALVE POSITION IS    251???
SIMULATED IN MODULE TMGFPT )
BOCA13 - 21 &22 STEAM GEN FEED PUMPS GOVERNOR CONTROL          251???
VALVES 21,22RS16 &21,22MS44 BOCA13 - 21 &22 STEAM GEM FEED PUMPS GOVERNOR CONTROL          251???
VALVES 21,22RS16 &21,22MS44 BOCA13 - 21 &22 STEAM GEN FEED PUMPS GOVERNOR CONTROL          251???
* VALVES 21,22RS15 &21,22MS44 BOCA14 - TURB AUX COOLING CONTROL VALVES 2TC259, 2TC260,        251???
2TC20 M600      BOCA15 - 21 &22 COMPONENT COOLING HX FLOW CONTROL VALVES        251???
21,22SW122 BOCA16 - 12 SLOWDOWN TANK PRESSURE CONTROL VALVE 2GB12 AND      251???
LEVEL CONTROL VALVE 2GB52 BOCA16 - CONDENSER HOTWELL LEVEL CONTROL VALVE 2CN56 &          251???
2DM136 BOCA17 - LETDOWN HEAT EXCHANGER LETDOWN TEMPERATURE CONTROL    251???
VALVE 2CC71 &HIGH OUTLET TEMPERATURE ALARM COMPARATOR BOCA18 - VOLUME CONTROL TANK LETDOWN DEVERT VALVE 2CV35, VCT    251???
LOW, LOW-LOW, &HI-HI LEVEL ALARMS. VCT AUTO MAKE-UP START/STOP SETPOINTS.
BOCA18 - VOLUME CONTROL TANK LETDOWN DEVERT VALVE 2CV35, VCT    251???
LOW, LOW-LOW, &HI-HI LEVEL ALARMS. VCT AUTO MAKE-UP START/STOP SETPOINTS.
BOCA19[B) - STEAM GENERATOR TEMPERATURE DESPLAY ANALOG CODE    251???
* FOR DIGITAL METERS ON 2RP5 BOCA19(A) - VALVE POSITION FOR 21-24MS18'S BOCA19(A) - VALVE POSITION AND MALFUCTION FOR 2CV71 251???
251???
BOCA19(A) - MANUAL VALVE POSITIONERS FOR 2CV8, 2CV132, 21,      251???
22CV160, 2NT35, 2RH20.
* Page No. 135 11/28/89 SALEM SIMULA TOR Simulator Design Database Sorted by Drawing Number TRAINING STATION    LOAD SYSTEM    TITLE                                                          DRAWING REVISION    11/01/89
  ------    ============================================================    ------- ===::::==== ========
BOCA19(A) - MANUAL VALVE POSITIONERS FOR 2CV8, 2CV132, 21,      251???
22CV160, 2NT35, 2RH20.
BOCP17 - LOGIC FOR AUTO/MANUAL STATION HC130B. (2CC71)          251???
BTPROG - TEMPERATURES FOR PUMP BEARINGS &STATORS, ALSO ROOM    251???
COOLER AND GENERATOR-ASSOCIATED TEMPERATURES.
E210      ELECT. POWER DIST SYS, 1 LINE DIAGRAM - 28V DC                  251???
X380      PNL. 684-2 SIM., 22/24 MS-10 CNTRL. STA. FRONT &REAR VIEW      251???  DO          DO CUTOUT
* X380      PNL. 684-2 SIM., 21,22,23,24MS10 CNTRL. STA. DC WIRING DIAG    251???  00          00 X380      PNL. 207, 23 AFP CONTROL STATION FRONT VIEW-DETAIL              251???  OD          OD X380      CHG PUMPS FLOW &PRESS. CONTROLS, DC WIRING DIAGRAM              251???  DO          00 X380      PNL. 207 SIM., 23 AFP CNTRL. STA. FRONT &VIEW REAR CUTOUTS      251 ??? 00          DO X380      PNL. 684-2, 21,23 MS-10 CNTRL.STA. FRNT. &REAR VIEW CUTOUTS    251???  00          00 X380      PNL. 684-2 SIM., 21,22,23,24MS10 CNTRL. STA. DC WIRING DIAG    251???  OD          00 X380      PNL. 216 SIM., CHG. PUMPS. FLOW &PRESS. CNTRLS, FRONT &        251???  00          00 REAR CUTOUTS X380      PNL. 684-2 SIM., 21/23MS10 CNTRL. STATION FRONT VIEW-DETAIL    251???  00          OD X380      HOT SHUTDOWN STATION, PNL. 213-2                                251???  00          DO X380      HSD DC WIRING DIAGRAM                                          251???
X380      CHG. PMPS FLOW &PRESS. CNTRLS, FRONT VIEW-DETAIL                251???  00          DO X380      HSD PNL. &PERIPHERAL PNLS., ELEC. &SIGNAL WIRING DIAGRAM        251 ??? 00          OD X380      HOT SHUTDOWN PANEL 213, AC WIRING DIAGRAM                      251???  OD          OD
* X380 X380 PNL. 684-2 SIM., 22/24MS10 CNTRL. STA. FRONT &REAR VIEW DETAIL PNL. 207 SIM., 23 AFP CNTRL. STA. DC WIRING DIAGRAM 251???
251???
DO          00 R400      NISYST - NUCLEAR INSTRUMENTATION SYSTEM                        251???
* Page No. 136 11/28/89 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
R400      NISYST - NUCLEAR INSTRUMENTATION SYSTEM                        251???
R400      NISYST - NUCLEAR INSTRUMENTATION SYSTEM                        251???
R600      PRZPNL - PRESSURIZER LEVEL AND PRESSURE CONTROL LOGIC.          251???
R600      PRZR01 - PRESSURIZER LEVEL AND PRESSURE CONTROL ANALOG          251???
COMPONENTS C900      RADIATION MONITORING SYSTEM                                    251???
C900      RADIATION MONITORING SYSTEM                                    251???
* R100      RCTPNL - OVERPOWER, OVERTEMP &LOOPS DELTA T                    251???
RECORDER SELECT RlOO      RPS012 - REACTOR PROTECTION LOGIC, REACTOR TRIP SIGNALS,        251???
            "SHEET 2' RlOO      RPS012 - REACTOR PROTECTION LOGIC, REACTOR TRIP SIGNALS,        251???
            "SHEET 2' R100      RPSD13 - REACTOR PROTECTION LOGIC, NUCLEAR INSTRUMENTATION      251???
TRIP SIGNALS AND MANUAL REACTOR TRIP LOGIC 'SHEET 3' RlOO      RPS013 - REACTOR PROTECTION LOGIC, NUCLEAR INSTRUMENTATION      251???
TRIP SIGNALS AND MANUAL REACTOR TRIP LOGIC 'SHEET 3' RlOO      RPS013 - REACTOR PROTECTION LOGIC, NUCLEAR INSTRUMENTATION      251???
TRIP SIGNALS AND MANUAL REACTOR TRIP LOGIC 'SHEET 3" RlOO      RPS013 - REACTOR PROTECTION LOGIC, NUCLEAR INSTRUMENTATION      251???
TRIP SIGNALS AND MANUAL REACTOR TRIP LOGIC 'SHEET 3' RlOO      RPS014 - NUCLEAR INSTRUMENTATION LOGIC, PERMISSIVS AND          251???
BLOCKS LOGIC 'SHEET 4' R100      RPS015 - REACTOR PROTECTION SYSTEM LOGIC, PRIMARY COOLANT      251???
SYSTEM TRIPS. 'SHEET 5'
* RlOO R100 RPS015 - REACTOR PROTECTION SYSTEM LOGIC, PRIMARY COOLANT SYSTEM TRIPS. "SHEET 5" RPS016 - REACTOR PROTECTION SYSTEM LOGIC, PRESSURIZER TRIP SIGNALS. 'SHEET 6' 251???
251???
 
,. Page No.
11/28/89 137 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
RlOO      RPS016 - REACTOR PROTECTION SYSTEM LOGIC, PRESSURIZER TRIP      251???
SIGNALS. "SHEET 6" RlDO      RPS017 - REACTOR PROTECTION SYSTEM LOGIC, STEAM GENERATOR      251???
TRIP SIGNALS. 'SHEET 7" RlOO      RPS017 - REACTOR PROTECTION SYSTEM LOGIC, STEAM GENERATOR      251???
TRIP SIGNALS. 'SHEET 7' RlDO      RPS018 - REACTOR PROTECTION SYSTEM LOGIC, SAFEGUARDS            251???
ACTUATION SIGNALS. 'SHEET 8" RlDO      RPS018 - REACTOR PROTECTION SYSTEM LOGIC, SAFEGUARDS            251???
* ACTUATION SIGNALS. 'SHEET 8" R500      RPS019 - ROD CONTROL SYSTEM, ROD SPEED AUTO AND MANUAL LOGIC    251???
            'SHEET 9' RlDO      RPS020 - STEAM DUMP CONTROL "SHEET 10'                          251???
RlOO      RPSD23 - REACTOR PROTECTION SYSTEM LOGIC, FEEDWATER CONTROL    251???
AND ISOLATION. 'SHEET 13" RlDO      RPS026 - REACTOR PROTECTION SYSTEM LOGIC, TURBINE TRIP          251???
            'SHEET 16' STGPNL - STEAM GENERATOR CONTROL, PROTECTION, AND LEVEL        251???
CONTROL. STEAM GENERATOR ATMOSPHERIC STEAM DUMP. (21-2,MSlD)
HOO      ZMOT10 - 21 &22 AUXILIARY FEED WATER PUMPS CONTROL LIGIC        251???
C300      ZMSC08 - OVERHEAD ALARMS                                        251???
R17D      ZMSC09 - LOGIC FOR STATUS LITES ON PANEL 2RP'                  251???
ZMSC1D(B) - AUXILIARY FEEDWATER CONTROL VALVES                  251???
ZMSC14 - HTDROGEN RECOMBINERS                                  251???
* M200 N210 ZMSC15 - FIRE PROTECTION SYSTEM LOGIC COMPONENT COOLING VALVES 2CC17 &21CC3 CCP CW INLET &OUTLET AND 2CC30, 21CCHX OUTLET ISOL. VALVES, LOGIC DIAGRAM, CONTROLS 251???
252293  OD      DD
* Page No.
11/28/89 138 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================  ------- ======== ========
N210      COMPONENT COOLING VALVES 2CC18 &22CC3 CCP CW INLET &OUTLET    252294  DO      00 AND 2CC31, 22CCHX OUTLET ISOL. VALVES, LOGIC DIAGRAM, CONTROLS M940      CONTAINMENT HYDROGEN MONITORING SYSTEM, LOGIC DIAGRAM,        252449  03      03 CONTROLS R120      EMERGENCY CORE COOLING SYS RHR &SI &CONT. SUMP VALVES          600000  02      02 EMERGENCY CORE COOLING AUTO. SWITCHOVER, LOGIC DIAGRAM, CONTROLS X190      PANELS 1RP4 &2RP4 POWER LOCK-OUT SWITCHES, FRONT VIEW,        600007  02      02 CONTROLS
* F320 F320 CONDENSER AIR REMOVAL &PRIMING, 22 VACUUM &SEAL WATER PUMPS, LOGIC DIAGRAM, SHEET 1, CONTROLS CONDENSER AIR REMOVAL &PRIMMING 22 VACUUM &SEAL WATER PUMPS, LOGIC DIAGRAM, SHEET 2, CONTROLS 600149 600213 03 02 03 02 M921      CONTROL AREA A.C. CHILLER CONDENSER WATER RECIRC. PUMPS &      600218  03      03 CHILLED WATER PUMPS, LOGIC DIAGRAM, CONTROLS HWOO      PLATE, POWER SUPPLY MTG PSE&G                                  600236  00      00 HWOO      REACTIVITY RACK                                                600237  00      00 HWOO      PARTS LIST REACTIVITY RACK                                    600251  DO      00 E520      MAIN GENERATOR VOLTAGE REGULATOR VOLTAGE MATCHING, AUTO        601031 TRACKING AND MANUAL ADJUSTER, SCHEMATIC, CONTROLS E520      MAIN GENERATOR VOLTAGE REGULATOR AUTOMATIC ADJUSTER CONTROLS  601032 SCHEMATIC, CONTROLS E520      MAIN GENERATOR VOLTAGE REGULATOR, REGULATOR AUTO/MAN. &PWR. 601033  01      01 SYS. STABILIZER TRANSFER, SCHEMATIC, CONTROLS MAIN GENERATOR RELAY PROTECTION, SCHEMATIC, CONTROLS          601034  01      01
* E560 E560      MAIN GENERATORS RELAY PROTECTION, A.C. SCHEMATIC, CONTROLS    601035  02      02 E520      MAIN GENERATOR EXCITATION VOLTAGE REGULATOR 125VDC,            601036 SCHEMATIC, CONTROLS E520      MAIN GENERATOR VOLTAGE REGULATOR EXCITER FIELD BREAKER, D.C. 601037  01      01 SCHEMATIC, CONTROLS
* Page No.
11/28/89 139 SALEM SIMULATOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
    ------    ============================================================  ------- ======== =======::::
E540      MAIN GENERATOR STATOR WATER SYSTEM CONDUCTIVITY RECORDER      601040 ALARMS A.C. SCHEMATIC, CONTROLS T600      TURBINE GENERATOR TURBINE TRIP REGULATOR                      601226  00      00 T600      TURBINE GENERATOR TURBINE TRIP BACK-UP                        601227  01      01 E110      500KV. SWITCHYARD, 208 V. MISCELLANEOUS POWER ONE-LINE,        601249  00      00 DIAGRAM, ELECTRICAL E540      MAIN GENERATOR NO. 22 STATOR COOLING WATER PUMP, LOGIC        601263  02      02 DIAGRAM, CONTROLS
* E540      MAIN GENERATOR NO. 21 STATOR WATER COOLING PUMP, LOGIC        601264  02      02 DIAGRAM, CONTROLS RlOO      REACTOR PROTECTION SYSTEM TURBINE TRIP, RUN BACKS &            601265  02      02 GENERATOR PROTECTION, LOGIC DIAGRAM, CONTROLS E140      2A-460V. VITAL BUS ONE-LINE, DIAGRAM, ELECTRICAL              601390  01      01 E140      2B-460V. VITAL BUS ONE-LINE, DIAGRAM, ELECTRICAL              601391  01      01 E140      2C-460V. VITAL BUS ONE-LINE, DIAGRAM, ELECTRICAL              601392  01      01 E140      2E-460V. BUS, ONE-LINE DIAGRAM, ELECTRICAL                    601393  01      01 E140      2F-460V. BUS, ONE-LINE DIAGRAM, ELECTRICAL                    601394  02      02 E140      2G-460V. BUS, ONE-LINE DIAGRAM, ELECTRICAL                    601395  02      02 E140      2H-460V. BUS, ONE-LINE DIAGRAM, ELECTRICAL                    601396  01      01 E140      2EP-480V. PRESSURIZER HEATER BUS, ONE-LINE DIAGRAM,            601397  02      02 ELECTRICAL E140      2GP-480V. PRESSURIZER HEATER BUS, ONE-LINE DIAGRAM,            601398  01      01 ELECTRICAL
* E140 E150 E150 CIRCULATING WATER INTAKE 2CW-460V. BUS, ONE-LINE DIAGRAM, ELECTRICAL 2A-230V. VITAL BUS, ONE-LINE DIAGRAM, ELECTRICAL 2B-230V. VITAL BUS, ONE-LINE DIAGRAM, ELECTRICAL 601399 601400 601401 01 04 03 01 04 03 I
* Page No.
11/28/89 140 SALEM SIMULA TOR Simulator Design Database Sorted by Drawing Number TRAINING STATION  LOAD SYSTEM    TITLE                                                          DRAWING REVISION 11/01/89
  ------    ============================================================    ------- ======== ========
E150      2C-230V. VITAL BUS, ONE-LINE DIAGRAM, ELECTRICAL                601402  03      03 E150      2F-230V BUS ONE LINE DIAGRAM, ELECTRICAL                        601403  01      01 E150      2H-230V BUS ONE LINE DIAGRAM, ELECTRICAL                        601404  01      01 E150      2FL 208/12DV LIGHTING BUS ONE LINE DIAGRAM, ELECTRICAL          601405  02      02 HWOO      C.C.-1 SHEET 1                                                  601825  DO      DO HWOO      C.C.-1 SHEET 2                                                  601826  DO      00 HWOO      C.C.-2 SHEET 1                                                  601827  DO      DO
* HWOO HWOO HWOO C.C.-2 SHEET 2 C.C.-2 SHEET 3 C.C.-3 SHEET 1 601828 601829 601830 DO OD DO DO DO DO HWOO      C.C.-3 SHEET 2                                                  601831  00      00 HWOO      C.C.-3 SHEET 3                                                  601832  DO      DO
* SP-206 SALEM SIMULATOR Computer Real Time Verification Real Time Monitoring 32/97 A. Slip Flags and Slip Flag Counters Real Time Execution is continually monitored in the executive program by a set of Slip Flags that are set by the executive program in the other processor, i.e., the Slip Flags for the CPU executive program are set by the IPU executive program and vice versa. The Slip Flags are reset by the appropriate executive program. The reason for this is due to the way the executives are suspended and resumed each frame.
Pseudo code for CPU:
Load Slip Flag for IPU Compare Slip Flag to .True.
If not equal set flag to .True.
If equal add 1 to counter Call modules Zero Slip Flag for CPU Pseudo code for IPU Load Slip Flag for CPU
* Compare Slip Flag to .True .
If not equal set flag to .True.
If equal add 1 to counter Call modules Zero Slip Flag for IPU Before the Slip Flag is set, the Slip Flag is checked to see if it is already set. If set, this would indicate that the exec has not finished and a slip counter is incremented.
By using the 'UPDATER' function on the Salem Simulator, the Slip Counters may be viewed. To accomplish this, enter the 'Updater' under user 'SYSTEM' and batch a file named 'SLIPTIME'. That file contains the following:
          'S2I11CNT'      Slip  Counter for IPU cycle 1
          'S2I12CNT'      Slip  Counter for IPU cycle 2
          'S2I13CNT'      Slip  Counter for IPU cycle 3
          'S2I14CNT'      Slip  Counter for IPU cycle 4
          'S2CllCNT'      Slip  Counter for CPU cycle 1
          'S2Cl2CNT'      Slip  Counter for CPU cycle 2
          'S2C13CNT'      Slip  Counter for CPU cycle 3
          'S2Cl4CNT'      Slip  Counter for CPU cycle 4 This display shows all the Slip Counters for the exec in the 32/97. The Counters may be reset to zero by using the modify
* directive in 'UPDATER' or by resetting the simulator to an I.C .
Appendix 8S                Date: 08/04/89 Rev . : _ __;:o;,_____
Page 1 of 3
 
SP-206 B. General Executive Execu-tion Time To obtain- percent spare time the following procedure is
* implemented:
                  !"--":,*
Us*ing 'SYMBOLIC' perform the following instructions:
SYM>$D SYM>IDLEFREQ 1  (THIS SETS A 1 SEC. INTERVAL)
SYM>$T TSM>!ACTI SPARETIM Using 'UPDATER' monitor these variables:
CPU2TIME IPU2TIME These variables will display the percent spare time of System 2 per second. The variables may also be ditsplayed on a 'Time vs Percent Spare Time' graph.                      ?
L II. Real Time Monitoring 32/77 A. Slip Flags and Slip Flag Counters The task 'CPUTMRON'/'IPUTMRON' is the controlling program for the CPU/IPU timing process and is catalogued at a higher priority than the executives. The reason for this is to ensure real time execution. This process is continually monitored by a set of Slip Flags and Slip Fl~g Counters that are shared between 'CPUTMRON/IPUTMRON' and the execs.
Pseudo code CPUTMRON/
IPUTMRON:  If (Slip Flag set) then Increment Slip Counter End if Set Slip Flags EXECS:  Call modules Clear Slip Flags Wait until next frame EverY,(fr,ame 'CPUTMRON'/'IPUTMRON' sets the Slip Flags and the execs&':clear them.        Before setting the Slip Flags,
          'CPUTMRON'/'IPUTMRON' checks to see if they are already set.
If so, this indicates that the exec did not finish and the appropriate Slip Counter is incremented *
* Appendix 8S Page 2 of 3 Date: 08/04/89 Rev.: - -
 
SP-206*
By using the 'UPDATER'* function on the Salem Simulator the Slip Counters may be viewed. To accomplish this, enter the
      'Updater' under user 'SYSTEM' and batch a file named
* I SLIPTIME  I *
            'SlillCNT'
            'SlI12CNT'
            'S1Il3CNT'
            'SlI14CNT' That file contains the following:
Slip Slip Slip Slip Counter Counter Counter Counter for for for for IPU IPU IPU IPU cycle cycle cycle cycle 1
2 3
4
            'SlCllCNT'      Slip Counter for CPU  cycle 1
            'S1C12CNT'      Slip Counter for CPU  cycle 2
            'S1Cl3CNT'      Slip Counter for CPU  cycle 3
            'SlC14CNT'      Slip Counter for CPU  cycle 4
            'S1Cl5CNT'      Slip Counter for CPU  cycle 5 This display shows all the Slip Counters for the execs in the 32/77. The Counters may be reset to'zero by using the modify directive in the 'UPDATER' or by resetting the simulator to an I. c.
B. General Executive Execution Time To obtain percent spare time the following procedure is implemented:
Using 'SYMBOLIC' perform the following instructions:
SYM>$D
* SYM>IDLEFREQ 1  (THIS SETS A 1 SEC. INTERVAL}
SYM>$T TSM>!ACTI SPARETIM Using 'UPDATER' monitor these variables:
CPUlTIME IPUlTIME These variables will display the percent spare time of System 1 per second. The variables may also be displayed on a 'Time vs Percent Spare Time' graph .
* Appendix 8S Page 3 of 3 Date: 08/04/89 Rev. : - - -
 
PCT/SEPCT/SEPCT/SECT/SE 100 . 100 . 100. 100 *
* SALEM SIMULATOR TIMING TEST 11/07/89 HOT FULL POWER , STEADY STATE
                                                                                                      *
    *o  90 . 0  90.0 90 . 0 80.0 80 . 0      80.0 80 . 0 70.0 70 . 0      70.0 70.0 o.o    60 . 0  60.0  &o .o                                                                                        3 0 . 0 50 . 0    50.0 50 . 0 1
40.0 40 . 0      40.0 .co .o 2
30 . 0 30 . 0    30.0 30 . 0 20 . 0 20 . 0 10.0 10 . 0 20.0 20 . 0 10.0 10 . 0
                                                                  -+ ------
  .ooo .ooo .ooo        . ooo -r-~~~--t~~~~+-~~~~~~~~t-~~~-t-~~~-i~~~~+-~~~-+~~~~+-~~~--t 4      3        2    1          60. 0 I 120. 180. 240. 300. 360. 420. 480.        540.        600.
-
-
-
-
1
* 2
* 77/80 CPU SPAFE 77 /80 IPU SPARE 3
* 97 /BO CPU SPARE 4 . 97/80 IPU SPARE
-SOLID LINES indicate
---DASHED LINES indicate TUE PCT/SEC TIME PCT/SEC TI ME PCT /SEC TIME PCT /SEC SIMULATOR DATA REFERENCE DATA u  .
SECONDS RUN DATE      :
SIMULATOR FILE: TIMING . SIM REFERENCE FILE: N/A
* 111 f/ tj                          !ASK # UA001.5.SU        GOULD C 0                    DE v L.* 7 7          1
                                                                                                                                              *
* J P )      A  f        /7/ 80                        1
                                                                                                                                              *
* 1*        llllC T    6D91C    81 9      c Vl:\ L. UE          l>l:.$C 1Pfl.ON CYCL r
                                                                                                                                              *
*
* 0 I~U            1      (      )
    -*
    ;>
3.
4 t>lll2C 1
_,1113C T r bl) 20 61..l92 tS1'.'.>9c!O tH~ c!4 0
v
                                                                  !Pl.I lPU YCL..E 2
* YCLE j c14) c J PU C YCl..E a
*
            ~1 ll4C *\iT
                                                                                                                                              *
* 61)9~8  a1:,    ~~                  0                        ( .... )
: s.      SlC llC 'H    6D'i2C    l
* 92c                    0 CPU C'r'CL.E 1          ( 10
    !>
* titC12C11f    bl)9    tH59.50                      0 CPU CfCL.E 2            c      )
*
* s 1c1.5c 1\lT 6 9.54  81~9.54 s .*
0 CPU CYCL.E                "')
1C14CllT    61J 38    l . .5 A                  0 CPU CYCL.E 4            (~)
    ~.      t c 1 C \iT 6tJ9~C    1~9~C                      0 Ct'U CYCL.&#xa3;              (~)
* 10.
11 12.
      *                                                                                                                                      *
* 13.
11" .
1 ::>.                                                                                                                                      *
* 15 .
* 1 7.
18 ,
*
* 1~ .
20 .
*                                                                                                                                              *
*                                                                                                                                              *
*                                                                                                                                              *
*                                                                                                                                              *
* SI APERTURE
                                                                                                                                              *
* CARD
                                                                                                                                              *
* Also Available On Aperture Card
*                                                                                                                                              *
*                                                                                                              ~00 ]0<60} KJ-~                *
*
*
*                                                                                                                                        ') .
 
                                                                                                                            " ..
- ---- ( -
* 11 I  f I                          T                            c          _- "I        1
                                                                                                                                  *
  *                          ...
I  '"'          11                1
                                                                                                                                  *
* L        L -
                --------------------------------------------------------------------------------                                *
* 1*
              ".
                                                                                                                                  *
  *
* 4 1
  *          'I *
                      ..)
                                                                                                                                  *
* 1 11.
                .                                                                                                                *
* 1 ., *
  *        *1 - *
  *
* I e                                                                                                                              *
* C'-(CLt        SL..t\V~NG 'TIME IFS-T 'S'CfS-n;fV' g__ 0y 7/Jo)
* vfh't    11 /07 /<?9
                                                                                                                                  *
                                                                                                                                  *
                                                                                                                                  *
* SI APERTURE
* CARD Also Available On
* Aperture Card
* C]OOIOiO / fO -03              *
                                                                                                                                  *
                                                                                                                                  *
  *                                                                                                                              ~*
 
SP-206 HOPE CREEK .& SALEM SIMULATOR Mass and Energy Balance/Drift Verification
* PURPOSE The conduct of the mass and energy balances and drift verification of the Hope Creek and Salem Simulators is required per ANS 3.5-1985 Section 4.1, Performance for Steady State Operation.
INITIAL CONDITIONS Critical Parameters The following parameters were selected as the critical parameters for the conduct of the mass and energy balances and drift verification:
Hope Creek                            .., _____
    *APRM A                                *Neutron Flux {N41}
    *APRM B                                *Thermal Core Power
    *APRM C                                *RC Loop 21 Tc
    *APRM D                                *RC Loop 22 Tc
    *APRM E                                *RC Loop 23 Tc
    *APRM F                                *RC Loop 24 Tc
    *Core Thermal Power                    *RC Loop 21 Th
    *Total Core Flow                      *RC Loop 22 Th
*
    *RR Loop A Flow                        *RC Loop 23 Th
    *RR Loop B Flow                        *RC*Loop 24 Th
    *RR Pump A Suet Temp                  *RC Tave
    *RR Pump B Suet Temp                  *PZR Pressure
    *RX Narrow Rng Press                  *PZR Level
    *RX Narrow Rng Lvl A                  *S/G 21 Pressure
    *Total Steam Flow                    *SIG 21 Feed Flow
    *Feed Flow Loop A                    *S/G 21 FW In Temp
    *Feed Flow Loop B                    *S/G 21 Level
    *Feed Temp Loop A                    *Gross MWatt Elect
    *Feed Temp Loop B
    *Main Stm Line Press
    *Main Gen Mwatts Elec
* Appendix 9                    Date: 08/04/89 Page 1 of 4                  Rev. : ---"o___
 
SP-206 Non-Critical Parameters The-following parameters were selected as the non-critical
* parameters for the conduct of the mass and energy balances and drift verification:
Hope creek
    *RX Wide Rng Level                  *Boron Concentration
    *CRD Flow                            *PZR Temperature
    *CRD Inlet Temp                      *Bank 'D' Position
    *RWCU Flow                          *21 Delta T
    *RWCU Inlet Temp                    *SIG 21 B/D Flow
    *RWCU Outlet Temp
    *Turb First Stg Press
    *Moist Separator Press
    *Cond Vacuum A
    *Cond Vacuum B
    *Cond Vacuum C
    *Hotwell A Temp
    *Hotwell B Temp
    *Hotwell C Temp MASS AND ENERGY BALANCE ACCEPTANCE CRITERIA
* The calculated values for steady state critical parameters shall agree with the reference data within 2% and shall not detract from training.
The calculated values for the steady state non-critical parameters shall agree w~th the reference data within 10% and shall not detract from training.
DESCRIPTION Three separate mass and energy balances are performed; the actual power levels chosen are dependent upon availability of reference data for the parameters identified. One heat balance is to be performed as close as practical to rated plant conditions.
The simulator is placed in the same operating configuration and power level as indicated by the reference data. Data is then collected for the critical and non-critical parameters identified above .
* Appendix 9                  Date: 08/04/89 Page 2 of 4                Rev.: - - -
 
SP-206 Collected data is entered i"ntb a pre-formatted spreadsheet with formulas embedded in the entry cells to calculate the minimum and
* maximum allowable values. The Heat Balance Data Sheet contains the following fields:
Hope Creek                            Salem PARAMETER:  A monitored point        PARAMETER:  A monitored point associated with the Nuclear Steam      associated with the Nuclear Steam Supply System and balance of plant    Supply System and balance of system.                                plant system.
COMP PT OR .INDICATOR                  DATABASE:  (date)  The reference IDENTIFICATION:    The computer        power level database values for point or indicator from which the      each parameter, obtained ffom the data is collected for each ~          reference plant or other parameter.                            reference data.
DATABASE:  (date)  The reference    MIN VALUE:  The minimum allowable power level database values for        value of the simulated parameter.
each parameter, obtained from the      Based upon the DATABASE value,
* reference plant or other reference    allowable error, and instrument data.                                  noise.
MIN VALUE:  The minimum allowable    ACTUAL VALUE:  The actual value value of the simulated parameter.      of the simulated parameter Based upon the DATABASE value,        obtained during the heat balance
* allowable error, and instrument      data collection .
noise.
MAX VALUE:    The maximum allowable ACTUAL VALUE:  The actual value of  value of the simulated parameter.
the simulated parameter obtained      Based upon the DATABASE value.
during the heat balance data collection.                          METER SCALE GRADUATION:    Minimum scale graduation that can be read MAX VALUE:  The maximum allowable    accurately by an operator.
value of the simulated parameter.
Based upon the DATABASE value,        The database and observed meter allowable error, and instrument      scale graduation are used to noise.                                calculate the minimum and maximum allowable value for each OBSERVED P-P NOISE:    The peak to    parameter at each of three power peak instrument noise associated      levels chosen as described on the with the identified parameter (if    attached heat balance data known).                              sheets.
The database and observed P-P noise values are used to calculate the minimum and maximum allowable value for each parameter at each of three power levels chosen as described on the attached heat balance data sheets.
Appendix 9                    Date: 08/04/89 Page 3 of 4                  Rev.: - - -
 
SP-206 DRIFT VERIFICATION ACCEPTANCE CRITERIA
* The calculated values for steady state critical and non-critical parameters monitored shall not deviate by more than 2% of the initial value during the 60 minute test duration.
* DESCRIPTION The drift verification is performed by initializing the simulator at rated power conditions. Data is then collected for the critical and non-critical parameters identified above.
The simulator is placed in RUN and an initial set of data is collected. Every 10 minutes, another set of data is collected.
Collected data is entered into a pre-formatted spreadsheet identifying the monitored ~arameter and its' value at each 10 minute interval .
*
* Appendix 9                  Date: 08/04/89 Page 4 of 4                Rev.: ~--'o~~-
 
.( .
  '    ,
SALEM SIMULATOR HEAT BALANCE PERFORMANCE DATA y
8
* 28 % POWER                OPERABILITY TEST
* DATE:l2/20/89 6.
                                                                                                                                              ,.
lMETER SCALE l SAT = 1 PRIMARY PARAMETER      DATA BASE l MIN. VALUE lACTUAL VALUEIMAX. VALUE      lGRADUATION    IUNSAT = 0 lNEUTRON FLUX fN41}      28.00 %        26.44 %      28.00 %      29.56 %    I 2 %            1
* I                                                      q l                          I                                                      1 lTHERMAL CORE          955.00 Mwat    935.90 Mwatl 962.00 Mwatl 974.10 Mwatl        0 Mwat        1 I
*
* I lRC LOOP 21 Tc          543.00 degF    527.14 degFl 542.80 degFl 558.86 degFl      10 degF          1 I
I lRC LOOP 22 Tc          543.00 degF    527.14 degFl 542.80 degFl 558.86 degFl      10 degF          1
* IRC LOOP 23 Tc          543.00 degF    527.14 degFl 542.90 degFl 558.86 degFl      1 0 degFl        1  I
* I                                    I I                                    I lRC LOOP 24 Tc          543.00 degFl 527.14 degFl 542.90 degF l 558.86 degF l      10 degFl        1 I                                                      I I                                                      I lRC LOOP 21 Th          561.00 degFl 544.78 degFl 561.00 degF    577.22 degFl      10 degFI        1
* I I
lRC LOOP 22 Th I
I 561.00 degFl 544.78 degFI 561.00 degF    577.22 degFl      10 degFI I
I 1
* lRC LOOP 23 Th I
I lRC LOOP 24 Th        1 561.00 degF 561.00 degF 544.78 degF l 561.00 degF 544.78 degFl 561.00 degF 577.22 degF 577.22 degF 10 degFI 10 degFI 1
1
* lRC Tave                552.00 degF I
I 539.96 degF[ 551.90 degF  564.04 degF          2 degFI I
I 1
*          +BORON CONC.
PZR PRESSURE 890.00 ppb I
801.00 ppb : 890.20 ppb I
I 979.00 ppb
                                ,2235.00 psigl2180.30 psigl2235.30 psig 2289.70 psig 0 ppb :
20 psigl I
I 1
1 3  *
* PZR LEVEL              29.00 %        27.42 %      28.60 %      30.58 %            2 %            1
*          +PZR TEMPERATURE
            +BANK 'D' POSITION 660.00 degF 184.00 step 589.00 degFI 652.70 degF I
I 165.60 stepl 190.00 step 731.00 degF 202.40 step 10 degFl 0 stepl 1
1
*          +21 Delta T            18.00 degF    15.20 degFI I
I 18.20 degF  20.80 degT        2 degFl        1
                                                                                                                      ;.''".      I
*          + NON-CRITICAL PARAMETER APERTURE CARD              *
* MAXIMUM AND MINIMUM VALUES WERE CALCULATED AS FOLLOWS:
Available 0 *
* 58 .
7 9
60 CRITICAL PARAMETERS:                                                                                          Aperture Carr
* 6' THE ALLOWABLE ERROR WAS CALCULATED BY ADDING 2% OF THE 28% DATA BASE VALUE                                                      6<
* 63 AND THEN ADDING 50% OF THE METER SCALE GRADUATION.                                                                              64 THE ALLOWABLE ERROR WAS THEN ADDED TO THE DATA BASE VALUE TO ARRIVE AT THE
*              'MAXIMUM' ALLOWABLE VALUE, AND SUBTRACTED FROM THE DATABASE VALUE TO ARRIVE AT THE
                'MINIMUM' ALLOWABLE VALUE.
* NON-CRITICAL PARAMETERS:
THE SAME APPROACH WAS USED EXCEPT THAT 10% OF THE 28% DATA BASE VALUE WAS USED TO CALCULATE THE ALLOWABLE ERROR .
9001o s o11 0 -04            7.
72
* ATTACHMENT 1
1
*
* I
                                                                                                                                                  *
 
~-
      -
* t
  *
* SALEM SIMULATOR HEAT BALANCE PERFORMANCE DATA 3
* 4
* 5 28 % POWER                                                                                                    6
* lMETER SCALE II SAT  =  1
* 9 SECONDARY PARAMETER I    DATA BASE  I I MIN. VALUE !ACTUAL VALUElMAX. VALUE    I GRADUATION  lUNSAT =  0                                      10 *
                  ----------------------------------------------------------------------------------------------                                                  1' lS/G 21 PRESSURE          905.00 psig' 876.90 psigl 933.00 psigl 933.10 psigl          20 psigl        1
* I I
lS/G 21 FEED FLOW          26.00 %        24.48 %      24.00 %      27.52 %            2 %            0  note 1 1  *
* lS/G 21 FW IN TEMP I
I IS/G 21 LEVEL 315.00 degF 44.00 %
308.20 degFI 272.50 degF 42.12 %      43.60 %
321. 80 degF 45.88 %
1 degF' 2 %
0 1
note 1
* l+S/G 21 BID FLOW l
40.00 Klbml    35.50 Klbm  42.90 Klbm  44.50 Klbm          1 Klbm        1
* I I GROSS Mwatt ELECT      I I 210.00 Mwatl 200.80 Mwat    213.50 Mwat  219.20 Mwat        10 Mwat        1
                  + NON-CRITICAL PARAMETER
* Klbm  =  x 1000 lbm/hr MAXIMUM AND MINIMUM VALUES WERE CALCULATED AS FOLLOWS:
,.*                  CRITICAL PARAMETERS:
THE ALLOWABLE ERROR WAS CALCULATED BY ADDING 2% OF THE 28% DATA BASE VALUE AND THEN ADDING 50% OF THE METER SCALE GRADUATION.
THE ALLOWABLE ERROR WAS THEN ADDED TO THE DATA BASE VALUE TO ARRIVE AT THE
                      'MAXIMUM' ALLOWABLE VALUE, AND SUBTRACTED FROM THE DATABASE VALUE TO ARRIVE AT THE
  *                  'MINIMUM' ALLOWABLE VALUE.
NON-CRITICAL PARAMETERS:
* THE SAME APPROACH WAS USED EXCEPT THAT 10% OF THE 28% DATA BASE VALUE WAS USED TO CALCULATE THE ALLOWABLE ERROR.
                                                                                                                                    /
                                                                                                                                      . *i.
SI
* note 1 Reference plant heat balance data is not normally done at 28% power.
We have insufficent data to make any tuning of the model at this time.
APERTURE CARD                J2
                                                                                                                                                                  ~J
* Next year, we will perform the annual heat balance tests at power leve l s that are consistent with the reference plant power levels.      Plus, we will collect sufficient secondary plant data necessary to make an accessment on the model's capability.
Available On
                                                                                                                                    } Aperture Card 541
* 551 56
                                                                                                                                                                  *71 581 *
* 4 o9 601 61
* 4                                                                                                                                                            62
* 63 64 ATTACHMENT  1                                                                                              651
* 5                                                      2                                                                                                    661
* 67 68 es                                                                                                                          900108 0110 -05                        *
  *                                                                                                                                                              ;,
* 73 76
  *    '  .J .                                                                                                                                            - ~. J    *
 
*
* SALEM SIMULATOR HEAT BALANCE PERFORMANCE DATA
* 75 % POWER                OPERABILITY TEST DATE:12/20/89
:METER SCALE : SAT = 1 2
* 4
*
* 5 PRIMARY PARAMETER      DATA BASE : MIN. VALUE :ACTUAL VALUE:MAX. VALUE        !GRADUATION :uNSAT = 0 8
lNEUTROW FLUX {N41}  :  75.00 %        72.50 %      75.00 %      77.50 %          2 %          1
* THERMAL CORE PWR I
I I
I
:2558.00 Mwat:2506.84 Mwat 2570 . 00 Mwat:2609.16 Mwat:
I I
0 Mwat      1
* RC LOOP 21 Tc RC LOOP 22 Tc 538.00 degF: 522.24 degF 538.00 degFI 522.24 degF 538.80 degFI 553.76 degF' 538.80 degFI 553.76 degF 10 degF 10 degF 1
1
* RC LOOP 23 Tc        538.00 degFI 522.24 degF I
I 539.30 degFI 553.76 degF        10 degF,      1
* RC LOOP 24 Tc
    ,RC LOOP 21 Th 538.00 degFI 522.24 degFI 538.90 degFI 553.76 degF I
I 588.00 degFI 571.24 degFI 586.70 degFI 604.76 degF 10 degFI 10 degFI 1
1
* I I
IRC LOOP 22 Th I
I I
588.00 degFI 571.24 degF' 586.70 degFI 604.76 degF, I
10 degFI      1
* I                                                                I IRC LOOP 23 Th          588.00 degFI 571 . 24 degF    586.70 degFI 604.76 degF        10 degF:      1 I
I IRC LOOP 24 Th          588.00 degFI 571.24 degF      586.70 degFI 604.76 degF        10 degFI      1
* I I
IRC Tave                563.00 degFI 550.74 degF      562.80 degFI 575.26 degF        2 degF:      1
* l+BORON CONC.
IPZR PRESSURE 633.00 ppb      569.70 ppb  I 633.50 ppb I 696.30 ppb 12235.00 psig 2180.30 psig 2235.90 psig'2289.70 psig I      0 ppb :
20 psigl I
I 1
1 40
* 41 I                                                                                                                                      42
* I 43 IPZR LEVEL              41. 00 %        39.18 %      42.20 %      42.82 %          2 %          1                                  44
*  :+PZR TEMPERATURE I
I 660.00 degF I 589.00 degF I
I 652.50 degF  731.00 degF      10 degF      1                                  46 .
45 4
48 l+BANK 'D' POSITION    228.00 stepl 205.20 step      228.00 step  250.80 step ,      0 step      1
* 1+21 Delta T            50 . 00 degFI  44.00 degF    47.80 degF    56.00 degTI      2 degF      1
*    + NON-CRITICAL PARAMETER SI APERTURE CARD 54 *
                                                                                                                                            ~5 56 57
* MAXIMUM AND MINIMUM VALUES WERE CALCULATED AS FOLLOWS:
CRITICAL PARAMETERS:                                                                                      Also vailable 0 58
* 59
* THE ALLOWABLE ERROR WAS CALCULATED BY ADDING 2% OF THE 75% DATA BASE VALUE AND THEN ADDING 50% OF THE METER SCALE GRADUATION.
THE ALLOWABLE ERROR WAS THEN ADDED TO THE DATA BASE VALUE TO ARRIVE AT THE Aperture Card
*        'MAXIMUM' ALLOWABLE VALUE, AND SUBTRACTED FROM THE DATABASE VALUE TO ARRIVE AT THE
          'MINIMUM' ALLOWABLE VALUE.                                                                      9 01 os o11 0 -ob
* 9 NON-CRITICAL PARAMETERS:                                                                                                          70
* 71 THE SAME APPROACH WAS USED EXCEPT THAT 10% OF THE 75% DATA BASE VALUE                                                              72 WAS USED TO CALCULATE THE ALLOWABLE ERROR.
ATTACHMENT  1 74 .
73 76 5
1
* *                                                                                                                                . " ..,
                                                                                                                                                *
 
                                                                                                                                    *
                                                                                                                                    *
* SALEM SIMULATOR HEAT BALANCE PERFORMANCE DATA
* 75 % POWER
.8    SECONDARY PARAMETER I IS/G 21 PRESSURE DATA BASE  I I MIN. VALUE I ACTUAL VALUE IMAX. VALUE I METER SCALE II SAT I GRADUATION  IUNSAT
      ----------------------------------------------------------------------------------------------
820.00 psigl 793.60 psig    821. 90 psigl 846.40 psigl        20 psigl
                                                                                                        =
                                                                                                        =
1 1
0
* IS/G 21 FEED FLOW        75.00 %      72.50 %      74.00 %        77.50 %
I 2 %            1
* I IS/G 21 FW IN TEMP      397.00 degF  388.56 degF  401.30 degF    405.44 degFI        1 degFI        1 I
I IS/G 21 LEVEL            44.00 %      42.12 %      43.60 %        45.88 %            2 %            1
* l+S/G 21 BID FLOW        40.00 Klbm    35.50 Klbml I
41.39 Klbm I
44.50 Klbmi I
1 Klbm        1
* I              I            I I GROSS Mwatt ELECT    820.00 Mwat  798.60 Mwatl 832.00 Mwatl 841.40 Mwati          10 Mwat        1
      + NON-CRITICAL PARAMETER
* Klbm = x 1000 lbm/hr MAXIMUM AND MINIMUM VALUES WERE CALCULATED AS FOLLOWS:
* CRITICAL PARAMETERS:
THE ALLOWABLE ERROR WAS CALCULATED BY ADDING 2% OF THE 75% DATA BASE VALUE
* AND THEN ADDING 50% OF THE METER SCALE GRADUATION.
THE ALLOWABLE ERROR WAS THEN ADDED TO THE DATA BASE VALUE TO ARRIVE AT THE
          'MAXIMUM' ALLOWABLE VALUE, AND SUBTRACTED FROM THE DATABASE VALUE TO ARRIVE AT THE
*        'MINIMUM' ALLOWABLE VALUE.
NON-CRITICAL PARAMETERS:
* THE SAME APPROACH WAS USED EXCEPT THAT 10% OF THE 75% DATA BASE VALUE WAS USED TO CALCULATE THE ALLOWABLE ERROR .
* i\ab\e On
* ure card
*
* ATTACHMENT  1                                                        9 o1os o11 _0 -07
* 2
*
*
* ~                                                                                                                                **
 
                                                                                                                                                ..
*
                                                                                                                                              ,
                                                                                                                                                  ,. . . .
* SALEM SIMULATOR HEAT BALANCE PERFORMANCE DATA
* 100 % POWER                OPERABILITY TEST DATE:12/20/89                                                                                *
* PRIMARY PARAMETER
  !NEUTRON FLUX {N41}
DATA BASE I MIN. VALUE IACTUAL VALUEIMAX. VALUE I 100.00 %      97.00 %    : 100.40 %    I 103.00 %
                                                                                !METER SCALE I SAT lGRADUATION 2 %
IUNSAT
                                                                                                    =
                                                                                                    =
1 1
0                                            6.
4 5
* !THERMAL CORE PWR    13411.00 Mwat 3342.78 Mwatl3400.00 Mwat13479.22 Mwatl I
1 0 Mwatl 1
1 1
1 1                                                  *
* IRC LOOP 21 Tc 1
1 IRC LOOP 22 Tc 537.00 degF 537.00 degF 521.26 degFI 538.20 degF ' 552.74 degFI 521.26 degFI 538.20 degF    552.74 degFI 1
1 10 degFI 10 degFI 1
1
* 1 1
IRC LOOP 23 Tc I
1 537.00 degF  521.26 degFI 538.30 degF    552.74 degFI      10 degFI        1  1
* IRC LOOP 24 Tc IRC LOOP 21 Th 537.00 degF 601.00 degF 521.26 degF 583.98 degF 538.30 degF, 552.74 degFI 600.70 degFI 618.02 degF 10 degFI 10 degFI 1
1
* RC LOOP 22 Th        601.00 degF  583.98 degF  600.70 degFI 618.02 degF        10 degFI 1
1 1
* RC LOOP 23 Th RC LOOP 24 Th 601.00 degFI 583.98 degF    600.70 degFI 618.02 degF 601.00 degFI 583.98 degFI 600.80 degFI 618.02 degF 10 degFI 10 degFI 1
1
* RC Tave              569.00 degFI 556.62 degFI 569.50 degF    581.38 degF        2 degFI        1
*  +BORON CONC .
PZR PRESSURE 633.00 ppb I 569.70 ppb I 591.00 ppb      696.30 ppb 2235.00 psigl2180.30 psigl2235.10 psig 2289.70 psig 0 ppb :
20 psigl 1
1 1                                              8.
                                                                                                                                                    !7 9
1
* PZR LEVEL              54.00 %      51. 92 %      52.30 %      56.08 %          2 %            1
*  +PZR TEMPERATURE
    +BANK 'D' POSITION 660.00 degF I 589.00 degFI 652.70 degF 1
I                          1 731.00 degFI 228.00 step: 205.20 stepl 210.00 stepl 250.80 step:
10 degFI 0 stepl 1
1
*  +21 Delta T            64.00 degFI  56.60 degFI  62.50 degFI  71.40 degTI 1
1 2 degF I      1              1*
                                                                                                                      *~ * .. ..,.. "'"'
APERTURE SI
*  + NON-CRITICAL PARAMETER                                                                                                              CARD
                                                                                                                                                    ~*
* MAXIMUM AND MINIMUM VALUES WERE CALCULATED AS FOLLOWS:
CRITICAL PARAMETERS:
o vailable 0 1 Aperture Card
* THE ALLOWABLE ERROR WAS CALCULATED BY ADDING 2% OF THE 100% DATA BASE VALUE AND THEN ADDING 50% OF THE METER SCALE GRADUATION.
THE ALLOWABLE ERROR WAS THEN ADDED TO THE DATA BASE VALUE TO ARRIVE AT THE
*      'MAXIMUM' ALLOWABLE VALUE, AND SUBTRACTED FROM THE DATABASE VALUE TO ARRIVE AT THE
        'MINIMUM' ALLOWABLE VALUE.
9 0 0 .1os o110 -04i
* NON-CRITICAL PARAMETERS:
THE SAME APPROACH WAS USED EXCEPT THAT 10% OF THE 100% DATA BASE VALUE WAS USED TO CALCULATE THE ALLOWABLE ERROR .
* ATTACHMENT 1
1 741 .
JI 6
*                                                                                                                                                        *
 
                                                                                                                                        *
*                                                                                                                                        *
* SALEM SIMULATOR HEAT BALANCE PERFORMANCE DATA 2.
1
* 100 % POWER
                                                                              !METER SCALE l SAT  = 1
* SECONDARY PARAMETER!
SIG 21 PRESSURE DATA BASE I MIN. VALUE !ACTUAL VALUEIMAX. VALUE 790.00 psigl 764.20 psigl 800.00 psigl 815.80 psigl
                                                                              !GRADUATION 20 psigl IUNSAT =
1 0
* SIG 21 FEED FLOW      100.00 %      97.00 %
I I
99.00 %    103.00 %    I I
I I
2 %    I I
I I
1
* SIG 21 FW IN TEMP SIG 21 LEVEL 428.00 degF 44.00 %
418.94 degFI 433.40 degFI 437.06 degFl 42.12 %      44.30 %      45.88 %
1 degFI 2 %
1 1
* l+SIG 21 BID FLOW        40.00 Klbm    35.50 Klbml  40.80 Klbml  44.50 Klbml I
I 1 Klbml I
I 1
* I GROSS Mwatt ELECT  11150.00 Mwat 1122.00 Mwatl1141.60 Mwatl1178.00 Mwatl      10 Mwat l
    ----------------------------------------------------------------------------------------------
    + NON-CRITICAL PARAMETER 1
* Klbm = x 1000 lbmlhr MAXIMUM AND MINIMUM VALUES WERE CALCULATED AS FOLLOWS:
                                                                                                                                        *
* CRITICAL PARAMETERS:
THE ALLOWABLE ERROR WAS CALCULATED BY ADDING 2% OF THE 100% DATA BASE VALUE
* l7 AND THEN ADDING 50% OF THE METER SCALE GRADUATION.                                                                            l8
* THE ALLOWABLE ERROR WAS THEN ADDED TO THE DATA BASE VALUE TO ARRI VE AT THE                                                  l 4G
        'MAXIMUM' ALLOWABLE VALUE, AND SUBTRACTED FROM THE DATABASE VALUE TO ARRIVE AT THE
*      'MINIMUM' ALLOWABLE VALUE .
NON-CRITICAL PARAMETERS:                                                                                                    44
* THE SAME APPROACH WAS USED EXCEPT THAT 10% OF THE 100% DATA BASE VALUE WAS USED TO CALCULATE THE ALLOWABLE ERROR .
*                                                                                                              , r~"'. .. - -
f              SI
* APERTURE CARD
* 7
                                                                                                                                    >81 .
59 Also Available On    0 Aperture Card
* 61 62
* 63 64 ATTACHMENT  1                                                                                  *s1
* 2 9 0 0 1 0 8 O I I 0 ... 0 ,
66
* 61 721 0.
q 1
74 .
731 75 76-J
*
* SALEM SIMULATOR STEADY STATE OPERATION PROCEDURE SSOP-1 28% POWER TABLE OF CONTENTS I*        OVERVIEW 1
II.        REFERENCES 1
III.      PERIODICITY 1
IV.        INITIAL CONDITIONS 1
: v.          ACCEPTANCE CRITERIA 1
VI.        RECORDING REQUIREMENTS 1 .                                  3 VII.      PROCEDURE 4
VIII. TEST
 
==SUMMARY==
 
7 APPENDIX A - EXPECTED PARAMETER VALUES I.              CRITICAL PARAMETERS 8
II.              NON-CRITICAL PARAMETERS                        9 III *.. ENERGY BALANCES 9
IV.              MASS BALANCE ANS 3.5 10 PERFOHMANCE
  ~~~;~UL" vl!*l            ~nR*
iii;...,                                      DATA
    ,  ~  ... -- -.  *~
                        "
                          .
i
          . J      *~.
: o. Energy balances shall be satisfied, to within plus or minus 2%*between;
: 1. Reactor power and gross electrical output
: 2. Tc and SG ~ressure
: 3. Reactor power and feedwater flow E. Mass balances shall be satisfied for the PZR and the SG's, to within plus or minus 2%.
SALEM*                                          ANS 3.5 SIMULATOR                                      PERFO:RMANCE Mj-\0:0-:-*rR I:
it                                        DATA Page 2 of 10
 
VI.          RECORDING REQUIREMENTS A. Critical Parameters
: 1. Power Range NI Channel N41
: 2. 21-24 RC Loop Tc's
: 3. 21-24 RC Loop Th's
: 4. 21 RC Loop Tave
: 5. 21 SG Feedwater Flow
: 6. 21 SG Pressure
: 7. Gross Electrical Output
: 8. PZR Pressure - narrow range
: 9. PZR Level
: 10. 21 SG Level - narrow range
: 11. 21 SG Feedwater Inlet Temperature
: 12. Core Thermal Power B.      Non-Critical Parameters 1*  PZR Temperature Control Rod Bank D Position Terror 21 RC  L~op Delta - T 5,  21 SG Slowdown Flow
                  . 6. RCS Boron Concentration ANS 3.5.
SAL ~l\t1                                      PERFORMANCE Sl ~,~U L~TOR                                              DATA
  .. '* '"' -- ;-R.
    ~
:1/j~  .* -
h I*'-    i L Page 3 of 10
 
VII. PROCEDURE A. General
: 1. Record all Critical and Non-Critical Parameters on the Data Recording System. Parameters shall be recorded every o.s seconds.
: 2. The failure of a Critical Parameter, an* Energy Balance, or a Mass Balance to meet the Acceptance Criteria of Section V will result in a failure of this test.~ Corrective action will be taken and documented using a Discrepancy Report, then this test shall be conducted again.
: 3. The failure of a Non-Critical Parameter to meet the Acceptance Criteria of Section V does not result in the failure of this test. Corrective action should be taken and documented using a Discrepancy Report.
: 4. A Discrepancy Report may be generated, even though a Parameter meets the Acceptance Criteria, if the Test Operator determines that the Parameter could be significantly improved.
B. Sequence of Events Test Operator Initials
: 1. Establish the Initial Conditions described in Section IV.
: 2. Place the simulator in run and record data for 1 minute.
: 3. End of Test
                                      *~-  ANS 3.5
                                      .*PER FORMAN CE SALEM                                    O~ATA SiMUL.~TOR Page 4 of 10
: c. Parameter Comparison Compare the recorded parameters to the Expected Values of Appendix A, using the Acceptance Criteria of Section v.
SAT      UNSAT
: 1. Critical Parameters
: a. N41
: b. 21 Tc
: c. 22 Tc
: d. 23 Tc
: e. 24 Tc
: f. 21 Th
: g. 22 Th
: h. 23 Th
: i. 24 Th
: j. 21 Tave
                                                                                  --~
: k. 21 SG Feedwater Flow    *Note 1  --~      -~-    .
: l. 21 SG Pressure
: m. Gross MWE
: n. PZR Pressure
: o. PZR Level
                                                                          ~i ~
P* 21 SG Level q.* 21 SG Feedwater Inlet Temp*Note 2.
: r. Core Thermal Power Non-Critical Parameters
                                                                ,
,----------------~ID*                      PZR Temperature PERFO:    *NC&#xa3;
\I                -* ,. , -'"'R
(''!\ .. ! , ) -111*.
v .
b    Bank D Position l '  *..J i ~ ','! U L;'"\ i                                          DATA i
i'
                  , '.. ,...-rR I\~ II
:,' H0 l C.
                        \. i '  .                  Page 5 of 10*----------1
  !
    -----------
 
c . Terror d
* 21 Oelta-T e
* 21 SG BIO Flow
: f. RCS Boron Concentration 3, Energy Balances
: a. N41/Gross MWE b
* N41/Core MTW
: c. Tc/SG Pressure
: d. N41/Feedwater Fl ow
: 4. Mass Balances
: a. PZR
: b. 21 SG c
* 22 SG d
* 23 SG
: e. 24 SG Note 1: Reference plant heat balance data is not normally done at 28% power. We have insufficient data to make any tuning of the model at this time. Next year, we will perform the annual heat balance tests at power levels that are consistent with the reference plant power levels. Plus, we will collect sufficient secondary plant data necessary to make an assessment on the model's capability.
::.u-~,,,"---~. .~""'-----
SALE NI*
  , r:\\ 0-:-  r ':''                Page 6 of 10 N'l r.u ' : :- ,.)
            '. - l \
* 1
 
VIII. TEST
 
==SUMMARY==
 
          <For any UNSAT items, include the Salem Simulator Discrepancy Report number)
A.      UNSAT Critical Parameters (this is a critical item>
B. UNSAT Non-Critical Parameters
: c. UNSAT Energy Balances <this is a critical item)
: o. UNSAT Mass Balances <this is a critical item) s SAT**
SALEM                                            ANS 3.5.
SINlULATOR                                        PERFOR~~1ANCE rvl ;i ~TFR
    . f'.v    I -                  Page 7 of' 10 DATA        J
 
APPENDIX A EXPECTED PARAMETER RESPONSE FOR STEADY STATE OPERATING PROCEDURE SSOP-1 28% POWER I. CRITICAL PARAMETERS ACCEPTANCE PARAMETER      EXPECTED VALUE              BAND        REFERENCE A. N41                28%              27.5 - 28.5%        IC-A B*  21 Tc              543&deg; F              532 - 554&deg;F        B
: c. 22 Tc              543&deg;F                532 - 554&deg;F        B
: o. 23 Tc              543&deg;F                532 - 554&deg;F        B E. 24 Tc              543&deg;F                532 - 554&deg;F        B F. 21 Th              56l&deg;F                550 - 572&deg;F        B G. 22 Th              561&deg; F              550 - 572&deg;F        B H. 23 Th              561&deg;F                550 - 572&deg;F        B I. 24 Th              56l&deg;F                550 - 572&deg;F        B J. 21 Tave            552&deg;F                541 - 563&deg;F        B K'o  21 SG FF            26%                  24 - 28%          B L. 21 SG Pressure    905 psig              887 - 923 psig    B M. Gross MW          210 MWE              206 - 214 MWE      B N. PZR Pressure    2235 psig            2190 - 2280 psig    B
: o. PZR Level          29%                  27 - 31%          B P. 21 SG Level        44%                  42 - 46%          B Q. FW Inlet Temp      315&deg;F                309 - 321&deg;F        B R. Thermal Power      955 MWT              936 - 974 MWT      B ANS 3.5.
PERFOHM:~NCE Page 8 of 10              DATA
: 11. NON-CRITICAL PARAMETERS ACCEPTANCE PARAMETER        EXPECTED VALUE          BAND          REFERENCE A. PZR Temperature    660&deg;F            594 - 726&deg;F          B
: s. Bank D Position    184 steps          166 - 202 steps      B
: c. Terror                0              -1.s to- +1
* 5&deg; F    lC-E
: o. 21 Oelta-T          18&deg; F            16 - 20&deg;F            B E. 21 SG BID        40,000 ill            36,000-            B Flow                    hr          44,000 lbm/lir F. RCS Boron Cone      890 ppm          801 - 979 ppm        B 111. ENERGY BALANCES ACCEPTANCE PARAMETER        EXPECTED VALUE          BAND            REFERENCE A. N41 @  28%        210 mwe            208 - 214 mwe          B
: s. N41 @  28%        955 mwt            936 - 974 mwt          B
: c. Tc @ 543&deg;F      Ps/g @ 905 psig      887 - 923 psig        B
: o. N41 @  28%        FF @ 26%            24 - 28%              B SALEM:
Sf~11ULATOH MASTER Page 9 of 10
 
IV.      MASS BALANCES ACCEPTANCE.
BALANCES      BALANCE VALUE            BAND        REFERENCE A. PZR                  Level @ 29%            27 - 31%          8 VCT Level Constant          + 2%
: a. 21 SG                  SF = FF                + 2%            8 Level @ 44%            42 - 46%
: c. 22 SG                  SF .. = FF              + 2%            8 Level @ 44%            42 - 46%                . I I
: o. 21 SG                  SF = FF                +/- 2%            B Level @ 44%            42 - 46%
E. 21 SG                  SF = FF                + 2%            B Level @ 44%            42 - 46%
SALEM                                            ANS 3.51 Sl~i1ULATOR                                        PERFORP~ANCE
          . *~\J !I L*-
I\\"W11ii,_.
      ~    ~1""1-rR DATA Page 10 of 10
 
SALEM SIMULATOR PERFORMANCE TEST SS1 DEG F      DEG  DEG FDEG F                                      28% POWER 100 . 630. 700. 700    .--
90 . 0 620. 630. 630 .  -...
80 . 0 610. 560 . 560                                                                                          2 I      I                  I                        1 70 . 0 600. 490. 490    .--                            -    -
__ ...
    .o  590. 420. 420    .--
0 . 0 580. 350. 350    .--
40 . 0 570. 280 . 280  .-- --
30.0 560.      210 . 210  .--                      --  -
3 20 . 0 550. 140. 140  .--      I              I      I I                  I        -
I            T
* 10 . 0 540. 70 . 0 70. o- -
                                                                      .
. 000 530.      .000 . 00 v-4      3      2      1        6.00      12.0  18.0  24.0    30.0  36.0 42.0    48 . 0    54.0        60.0 1    21 RC LOOP Tc                                      SECONDS 2 . 21 RC LOOP Th 3
* 21 RC LOOP TAVG 4
* 21 REACTOR COOLANT LOOP DELTA T                                        RUN DATE      : 12/20/89
--- SOLID LINES indicate SIMULATOR DATA                                            SIMULATOR FILE: PTP-SS1.SIM
---DASHED LINES indicate REFERENCE DATA                                            REFERENCE FILE: PTP-SS1 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS1 DEG      PCT  PSIG PCT                                                        28% POWER 00 . 120. 1200 120.*- - - - - - - - - - - - - - - - - -
400 . 96.0    960. 96 . 0- ""
300 . 72.0    720. 72.0- -
                            -------------------------------------------------4 250 . 60.0    600. 60 . 0- -
200 . 48.0    480. 48 . 0- -
                                          -
                                            --- ~~  -        ..,--    .....,,  -  I            --    ----~
!50.    ~.. *** ~ ~
100 . 24.0
              -*
240. 24 . -
                              - - _  J_-~ _J_ _-_J_--_1_--_l_-__l _-_J_-_J_--_J_--_! '                                                      1 0 . 0 12. 0  120. 12 . 0- -  -------+----- - -
                                                                    ------ --t            1---,--- I                        I            I
.ooo .oool .ooo      . 00:0-t--------+----------+--*-------+---------t--:-------+------------1---------+--------4--------**---------1 4      3      2    1            6.00        12.0    18.0      24.0          30 . 0 36 . 0    42.0      48.0      54.0        60 . 0 1 . 21  STM GEN FEED FLOW                                                SECONDS 2 . 21  STM GEN PRESSURE 3 . 21  STM GEN LEVEL 4 . 21 STM GEN Af INLET TEMP                                                                          RUN DATE      : 12/20/89
- - SOLID LINES indicate SIMULATOR DATA                                                                      SIMULATOR FILE: PTP-SS1.SIM
---DASHED LINES indicate REFERENCE DATA                                                                      REFERENCE FILE: PTP-SS1 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS1 DEG F PCT PSIG                                                    28% POWER 700. 100. 25010- -                                    - -  -                                      I          I          I
                          ..._.
I        I        I
                                - - - - - -- ---------------
I T        I                                    -
630. 90.0 242!O- -                                _.__
                                                                                                      -- --
560. 80.0 23410- -
490. 70 . 0 226;o- -
1 420. 60.0 21810- -
350. 50.0 21010- -                                                                                                --
280. 40.0 202!0- ""        -      - ---
210. 30.0 19410-    ..                          - -      -
                                                                    -i.---- -            --        -- -                              I 140. 20.0 186iO- "-                                                                                        - -
: 70. 10.0 17810- -
      .000 .000 170 - 'V                ..
6.00    12 . 0  18.0    24.0        30.0 36 . 0  42 . 0      48.0      54.0        60.0 3    2      1 1 . PRESSURIZER PRESSURE                                              SECONDS 2 . PRESSURIZER LEVEL 3 . PRESSURIZER VAPOR          TEMPERATURE RUN DATE      : 12/20/89
- SOLID LINES indicate SIMULATOR DATA                                                                SIMULATOR FILE: PTP-SS1. SIM
---DASHED .LINES indicate REFERENCE DATA                                                              REFERENCE FILE: PTP-SS1. REF
 
SALEM SIMULATOR PERFORMANCE TEST SS1 MWT  STEPS  MWE  PCT                                          28% POWER 3500 230. 1200 120    --
3150 207. 1080 108  .--
2800 184. 960. 96 . 0-
                          -                      I        I          I    J_      ___
                                                                                        ----                                      3 3
2450 161. 840. 84 . o- -
2100 138. 720. 72. 0- '"
1750 115. 600. 60 . o- -
1400 92. 480. 48. v-1050 69.0    360. 36. o- -
                                              -
I                                                                                                1 700 . 46.0  240. 24. v-I      I      I    --  I    -
                                                                            -    - - -
I
                                                                                              -- -
I
                                                                                                        - - - -- - ---        -I  I 350 . 23. 120 . 12. o- -
                                                  .
            . 000 .00 v-
                                                                        .
. 000  .000                                      -.                                                                            .
4    3      2    1          6.00    12.0    18 . 0    24 . 0      30.0 36 . 0      42 . 0      48 . 0      54 . 0      60 . 0
-    1 . POWER RANGE N-41                                        SECONDS
-    2 . GROSS ELECTRICAL OUTPUT
-    3
* CONTROL BANK D POSITION
-    4
* MEGAWATTS THERMAL CORE                                                                  RUN DATE        : 12/20/89
-SOLID LINES indicate SIMULATOR DATA                                                            SIMll..ATOR FILE: PTP-SSLSIM
---DASHED LINES indicate REFERENCE DATA                                                          REFERENCE FILE: PTP-SS1 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS1 DEB FOES F                                                          28% POWER 700. 700 .* .. - - - - - - - - - - - - - - - - -
630. 630 .-- -----11-------+------11-------------1---                                    -+------11------------------i 560. 560 . -t------:------:------------~--.;__                                ,  ----:..------------------                                    2 1
490. 490 .--
420. 420 .-- - - - - - ; r - - - - - - t - - - - - - ; - - - - + - - - - - - + - - - - - - - - - - - + - - - - - - + - - - - - - I 350. 350 .--
280. 280 .--
210. 210 .--
140. 140.--
70.0 70 . :
o-r-----t-----+-----t-----+------f------+----~-----1------1-------1
          .000 . OO~o+---------t--------+-----+--------+--------1---------*1--------4----------1--------~-------1 2    1              6 . 00        12 . 0        18.0        24.0        30.0        36.0          42.0        48.0      54.0        60.0 1  22 RC LOOP Tc                                                            SECONDS 2  22 RC LOOP Th RUN DATE      : 12/20/89
---SOLID LINES indicate SIMULATOR DATA                                                                                      SIMULATOR FILE: PTP-SS1.SIM
---DASHED LINES indicate REFERENCE DATA                                                                                    REFERENCE FILE: PTP-SS1 .REF
 
SALEM SIMULATOR PERFORMANCE TEST SS1 DEG FOEG F                                    28% POWER 700. 700 ....
630. 630 ....
560. 560                                                                                          2 I    I        I          I        I          I              1 490. 490  .....
420. 420  .....
350. 350  .....
280. 280    ....
210. 210  .--
140. 140  .--
70.0 70. o- -
I
          .000 .00 v-                                                    .        .
2    1          6.00      12.0  18.0 24.0    30.0  36.0 42.0    48.0        541.0        60.0 1  23 AC LOOP Tc                                    SECONDS 2  23 AC LOOP Th AUN DATE      : 12/20/89
~SOLID    LINES indicate SIMULATOR DATA                                      SIMll.ATOR FILE: PTP-SS1.SIM
---DASHED LINES indicate REFERENCE DATA                                      REFERENCE FILE: PTP-SS1 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS1 DEG FDEG F                                    28% POWER
                    .-
700. 700 ...
630. 630 .- ..
560. 560                                                                                        2 I        I    I    I        I    I            I          I              1 490. 490 .-.
420. 420 .- ..
350. 350 .--
280. 280 .--
                    .-
210. 210 ...
140. 140 .--
70.0 70. o- -
          .000 .00 -
v 6.00      12.0  18.0  24.0    30.0  36.0 42.0    48.0      54.0        60.0 2    1 1  24 RC LOOP Tc                                    SECONDS 2  24 RC LOOP Th RUN DATE      : 12/20/89
---SOLID LINES indicate SIMULATOR DATA                                      SIMULATOR FILE: PTP-SS1. SIM
---DASHED LINES indicate REFERENCE DATA                                      REFERENCE FILE: PTP-851.REF
 
                                                                                - ----------------~
XE 4                        SALEM SIMULATOR PERFORMANCE TEST SS1 LB/HRDEG F                                          28% POWER 5 . 00 5.0 v 4.50 4.0 o- i-2 4.00 3.0 0-
                          ...,. __ __----    -- __ J ____  I        I
                                                                - ----    I - - - _J_- - - - ----------  I 2
3.50 2.0 0- '"
3 . 00 1.00- -
2 . 50 .00 v -                                      -                                                      -
2 . 00-1.0 o- i-1.50-2.0 0- ...
1.00-3.0 o- i-
            .500-4.0 o- i-
            . 000-5 . 0v-6.00  12.0    18.0  24 .0    30.0  36 . 0
                                                                                    ..
42 . 0
                                                                                              ..
48 . 0
                                                                                                          .
54.0          60 .0 2    1 1  T AVE - T REF DEVIATION                                SECONDS 2  21 STM GEN SLOWDOWN FLOW RlM DATE      : 12/20/89
---SOLID LINES indicate SIMULATOR DATA                                                    SIMULATOR FILE: PTP-SSLSIM
---DASHED LINES indicate REFERENCE DATA                                                  REFC"RENCE FILE: PTP-SS1 . REF
 
SALEM SIMULATOR STEADY STATE OPERATION PROCEDURE SSOP-2 75% POWER TABLE OF CONTENTS I'                    OVERVIEW                                                              1 II.                    REFERENCES-                                                          1 III.                  PERIODICITY                                                          1 IV.                    INITIAL CONDITIONS                                                    1
: v.                    ACCEPTANCE CRITERIA                                                  1 VI.                    RECORDING REQUIREMENTS                                                3 VII.                  PROCEDURE                                                            4 VIII.                  TEST
 
==SUMMARY==
7 APPENDIX A - EXPECTED PARAMETER VALUES I.                  CRITICAL PARAMETERS                                    8 II.                NON-CRITICAL PARAMETERS                                9 III.              ENERGY BALANCES                                          9
                                                                                  -
IV.                MASS BALANCE                        r* ---------------~ 1o ANS 3.5
                    \
_,.
L l c:;. 'iJ. c~../
                                ' .11
                                -                                                  PERFORMANCE
:"""'.,,,,?,L 'l,-'"'\*:""""'\
          \'......
            .
I'; '*lj I'
                          !~I;
* I J~. 1' i, ,'1'
                                              '-'
                                              ,,\                                        DATA
                \.        ::""'---                                        i
                      .'    ' .
*-. . -p---- . --*--*-**- -- .- . . . . -. . - ..... ,___,._,. . .
: o.          Energy balances shall be satisfied, to within plus or minus 2% between;
: 1.      Reactor power and gross electrical output
: 2.      Tc and SG pressure
: 3.      Reactor power and feedwater flow E.          Mass balances shall be satisfied for the PZR and the SG's, to within plus or minus 2%.
SALENl SiMLJL~~TOR
~  .,
I;:.,
'\ : ** '
          '    ,..
          ., .. - ~
              ! . . '
              '... 1
__  ~
*. j;-',\.,, I : _ ; \
Page 2 of 10
 
VI.            RECORDING REQUIREMENTS A.            Critical Parameters
: 1.        Power Range NI Channel N41
: 2.        21-24 RC Loop Tc's
: 3.        21-24 RC Loop Th's
: 4.        21 RC Loop Tave
: s.        21 SG Feedwater Flow
: 6.        21 SG Pressure
: 7.        Gross Electrical Output
: 8.        PZR Pressure - narrow range
: 9.        PZR Level
: 10. 21 SG Level - narrow range
: 11. 21 SG Feedwater Inlet Temperature
: 12. Core Thermal Power
: s.            Non-Critical Parameters
: 1.      PZR Temperature
: 2.        Control Rod Bank D Position
: 3.        Terror
: 4.      21 RC Loop Delta - T
: s.        21 SG Slowdown Flow
: 6.      RCS Boron Concentration r            Ill .... ,
ANS 3.5
    *"&deg;'
    ..
      -*
: ;~ ;
1    I
                      '~
                --~.1~
                      ... ~
                          ; ,,*1 PERFORMAJVCE
: ; ~ .\ -; {9'~ ~J
        ; : ...* ;-,-~      ~ -~,;  l\                            L      DATA
      .    ~    ,-\ -:- ,_ i":                                                        J
    ;  :  I*.~        *  ~:.  .. \\
Page 3 of 10
 
VI
 
==I. PROCEDURE==
 
A. Genera 1
: 1. Record all Critical and Non-Critical Parameters on the Data Recording System. Parameters shall be recorded every 0.5 seconds.
: 2. The failure of a Critical Parameter, an Energy Balance, or a Mass Balance to meet the Acceptance Criteria of Section V will result in a failure of this test.~ Corrective action will be taken and documented using a Discrepancy Report, then this test shall be conducted again.
: 3. The failure of a Non-Critical Parameter to meet the Acceptance Criteria of Section V does not result in the failure of this test. Corrective action should be taken and documented using a Discrepancy Report.
: 4. A Discrepancy Report may be generated, even though a Parameter meets the Acceptance Criteria, if the
            *Test Operator determines that the Parameter could be significantly improved.
B. Sequence of Events Test Operator Initials
                                                    --:----~--
: 1. Establish the Initial Conditions described in Section IV.
                                                    ----~
Place the simulator in run and
                                                    ----~----
2.
record data for 1 minute.
: 3. End of Test I
ANS 3.5.
PFPFflF1.~1fi /l l\i r r
_,' ,,,.,J\;~Jr\hut DATA Page 4 of 10
 
                                                                            -- ~ -----=----- - - - - - - - - - - -
                                                                                                        ---
: c.              Parameter Comparison Compare the recorded parameters to the Expected Values of Appendix A, using the Acceptance Criteria of Section v.
SAT            UNSAT 1*    Critical Parameters
: a. N41
: b. 21 Tc
: c. 22 Tc
: d. 23 Tc e
* 24 Tc
: f. 21 Th
: g. 22 Th                                                ---~-
: h. 23 Th i
* 24 Th j
* 21 Tave k
* 21 SG Feedwater Flow 1
* 21 SG Pressure
: m. Gross MW n
* PZR Pressure
: 0. PZR Level
: p. 21 S_G Leve* 1
: q. 21 SG Feedwater Inlet Temp r
* Core Thermal Power
_,_,,,r~t*-
          \._jj:j
        * , '
                    *--*  j      ''\'*
IJ Non-rritical Parameters
                                                                                                - *.s
                                                                                .PE~-MANcr-- 1
          ...,,,                    ~*
: a. rzR Temperature
" I ;\ .- '.          I '.  - '- -    ,; ~J
" *I l'.!I
'-..J    I .
: - ~I, *i-0
                  -.J l - :''
t V j \. b.  ,Bank D Position
      *"' l'
:\/j      .. " - . -
1:!_ ., ; :- !i
      .. I ....... I .... i '
r      ~
l i
                                                                                        *ATA I        Page 5 of 10
: c. Terror                -----
: d. 21 Delta-T            -----
e
* 21 SG B/D Flow        -----
: 3. Energy Balances
: a. N41/Gross MWE          -----
: b. N41/Core MTW          -----
: c. Tc/SG Pressure        -----
: d. N41/Feedwater Flow.    -----
: 4. Mass Balances
: a. PZR                    -----
: b. 21 SG                  -----
: c. 22 SG                  -----
: d. 23 SG                  -----
e
* 24 SG                -----
SALF~ft sirvl uL/1.TcH
  '1'    i  ,..,~~.-.
P.lt      ~~:
: '*1 :J.i\J  ~ ,- ;1
                . __ , \
Page 6 of 10
 
VIII.                  TEST
 
==SUMMARY==
 
                      <For any UNSAT items, include the Salem Simulator Discrepancy Report number)
A.              UNSAT Critical Parameters <this is a critical item)
B.              UNSAT Non-Critical Parameters
: c.              UNSAT Energy Balances <this is a critical item)
: o.              UNSAT Mass Balances <this is a critical item)
                                                                  --~r*_::al        i
                                                                            <Signature)
Performance Engineer
                                                                      .,- Salem Simulator
                                                                                            -
ANS 3.5 t"'\ I "I
>'*.'it'
._,,
* I  I
            '.
I l :
                  *_,/
                        ~
__ ,
                                *\ -,- ("\
                              ..;j\i'\
                                  ....  ....,
                                              ~
I
* PERFORMANCE
        '. .* .*. '""" T r :-)
        ....
        ; \t j                ~
                                    *-*
DATA, Page 7 of 10 ------.:.;,.:_._....__j I  I  ''*          ;-  :*\
                      ,\._,.
 
APPENDIX A.
EXPECTED PARAMETER RESPONSE FOR STEADY STATE OPERATING PROCEDURE SSOP-2 75~ POWER I. CRITICAL PARAMETERS ACCEPTANCE PARAMETER                      EXPECTED VALUE                BAND            REFERENCE A. N41                                75%                7 4. 5 - 75
* 5% .      IC-A
: 8. 21 Tc                            538&deg; F                528 - 548&deg;F            8
: c. 22 Tc                            538&deg;F                528 - 548&deg;F            8 D. 23 Tc                            538&deg;F                528 - 548&deg;F            8 E. 24 Tc                            538&deg;F                528 - 548&deg;F            8 F. 21 Th                            588&deg;F                576 - 599&deg;F            8 G. 22 Th                            588&deg;F                576 - 599&deg;F            8 H. 23 Th                            588&deg;F                576 - 599&deg;F            8 I. 24 Th                            588&deg;F                576 - 599&deg;F            8 J. 21 Tave                          563&deg;F                552 - 574&deg;F            8 K. 21 SG FF                          75%                  73 - 77%              8 L *. 21 SG Pressure                  820 psig              804 - 83.6  ps i g    8 M. Gross MW                          820 MW                804 - 836 MW          8 N. PZR Pressure                    2235 psig            2190 - 2280 psig        8 Q. PZR Level                          41%                  39 - 43%              8 P. 21 SG Level                        44%                  42 - 46%              8 Q. FW INLET TEMP                    397*F                389 - 405&deg; F .        c R. Thermal Power                    2558 MWT
* 2507 - 2609 MWT          c I
SALEM
* ANS 3.5 Slrv'lULATOR                                                      PERFO,Rfil/ANCE I
tl
*
        .*',11"
          ~
_, , \."--R
(. ~
          ~ '~'
                      .... ~
                  '*....,  ' -.
                            ' I  i
                              .- ?              Page 8 of 10                  DATA
 
II. NON-CRITICAL PARAMETERS ACCEPTANCE PARAMETER        EXPECTED VALUE            BAND          REFERENCE A. PZR Temperature    660&deg;F            594 - 726&deg;F          c B. Bank D Position    228 steps          205 - 240 steps      B
: c. Terror                0              -t.5 to +1
* 5&deg; F    IC-E
: o. 21 Delta-T          S0&deg;F              45 - 55&deg;F            B E. 21 SG B/D        40,000 ill              36,000-          B Flow                  hr*          44,000 lbm/hr F. RCS Boron Cone                                              c III. ENERGY BALANCES ACCEPTANCE PARAMETER        EXPECTED VALUE            BAND          REFERENCE A. N41  @ 75%        820 mwe            804 - 836 mwe        B
: s. N4.1  @ 75%        2258 mwt          2507 - 2609 mwt        c
: c. Tc  @ 538&deg;F    Ps/g @ 820 psig.      804    836 psig      B
: o. N41  @ 75%        FF @ 75%            73 - 77%            B
                                            '
ANS 3.5 PER.FOH~1ANCE Page 9 of 10 DATA
 
IV. MASS BALANCES ACCEPTANCE BALANCES            BALANCE VALUE          BAND          REFERENCE r
A. PZR                        Level @ 41%        39 - 43%            B VCT Level Constant        + 2%
B. 21 SG                        SF = FF              + 2%              B Level @ 44%          42 - 46%
: c. 22 SG                        SF*= FF              + 2%            B Level @ 44%          42 - 46%
: o. 21 SG                        SF = FF              .:!: 2%          B Level @ 44%          42 - 46%
E. 21 SG                        SF = FF              + 2%            B Level @ 44%          42 - 46%
ANS 3.5 SALEM                                        PERFOHMANCE SHv1ULATOR                                                DATA i\iV'1 f"'\v    c i\ ~.,..I LlP.\        Page 10 of 10
 
SALEM SIMULATOR PERFORMANCE TEST SS2 DEG F DEG DEG FDEG F                                            75% POWER 100 . 630. 700. 700 .--                                                          ~-
90 . 0 620. 630 . 630 .....
2 80 . 0 610. 560. 560 ....
                                            +---+          I          I        I I        I 1
70 . 0 600 . 490. 490 .--
60 . 0 590. 420 . 420  .--
50 . 0 580. 350. 350 .--  -- --  - - --  * ---~-  -- --      -                  - - ----- -  - ~  - - -~I-  -  -  -  -    4 4
40 .0 570. 280. 280 .--                                                  ---
1-    --
s 30 . 0 560. 210. 210  .--  --                                                                  - - -
20 .0 550 . 140. 140  .--
10 . 0 540. 70.0 70 . o- - --- -    -
  . 000 530.  .000 .00 v-
                                                                                                                              ..
4    3    2    1          6 .00    12.0    18.0    24.0      30 . 0    36.0      42.0    48.0      54.0          60.0 1 21 RC LOOP Tc                                            SECONDS 2 . 21 RC LOOP Th 3 . 21 RC LOOP TAVG 4 . 21 REACTOR COOLANT LOOP DELTA T                                                      RUN DATE    : 12/20/89
--SOLID LINES indicate SIMULATOR DATA                                                          SIMULATOR FILE: PTP-SS2 . SIM
---DASHED LINES indicate REFERENCE DATA                                                        REFERENCE FILE: PTP-SS2 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS2 DEG    PCT  PSIG  PCT                                                  75% POWER 00 . 120. 1200 120 .
450 . 108. 1080 108 .
400 . 96. 960.                .........
96 .~~---~_-_ _~-~-~-.;._-----_;....----~-------=----___;;._                      _____;. . __________                ~~----=        ~
                                            ------1--------- ,----1-------------1----1 a
1 1
I 100 . 24.0    240. 24 .
* 000  .00  .000 . OOo+----- + - - - - - + - - - - - - + - - - - - + - - - - - - - - - - - + - - - - - - 1 1 - - - - - - - - - - 4 4      3    2    1          6. 00      12. 0      18.0        24.0          30.0        36.0        42.0        48.0                      60.0
-      1 . 21 STM  GEN FEED FLOW                                            SECONDS
-      2 . 21 STM  GEN PRESSURE
-      3 . 21 STM  GEN LEVEL
-      4
* 21 STM  GEN FW INLET TEMP                                                                                    RUN DATE        : 12/20/89
-SOLID LINES indicate SIMULATOR DATA                                                                                  SIMULATOR FILE: PTP-SS2 . SIM
---DASHED LINES indicate REFERENCE DATA                                                                                REFERENCE FILE: PTP-SS2 . REF
 
DEG F PCT PSIG SALEM SIMULATOR PERFORMANCE TEST SS2 75% POWER
                  *5*~~ - - - _1_ - - - J ---J---_l _--_1_- - - L- - - J ---_1_ - - - ~ - - - - ~ ~
700. 100 .
630. 90.0 2420- '"
560. 80.0  2340- ~
490. 70 . 0 2260- ~
420. 60 . 0 2180- ~
350. 50.0 2100- --
_____,________ _
280. 40 . 0 2020- =- -=-=-- - - --=-=-- - - - - - - - - - - --:_- - - --=-- - - - - - =-=-= - - - - - - - - - - - - - - - ~
210. 30 . 0 1940- ..  --------
140. 20. 0  1860- ~
70.0  10 . 0 1780- -
      .00  . 000  170~o+--------+---------+---------+--*-------+---------1---------+----------<----------+--------4---------'
3      2      1            6.00      12.0      18.0    24.0        30.0      36.0      42 . 0    48.0      54.0        60.0 1 PRESSURIZER PRESSURE                                            SECONDS 2 . PRESSURIZER LEVEL 3 . PRESSURIZER VAPOR TEMP RUN DATE      : 12/20/89
~ SOLID    LINES indicate SIMULATOR DATA                                                                SIMULATOR FILE: PTP-SS2 .SIM
---DASHED LINES indicate REFERENCE DATA                                                                  REFERENCE FILE: PTP-SS2 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS2 MWT STEPS MWE PCT                                                    75% POWER 3500 230 . 1200 120    --                                                                                                              3 31!50 207 . 1080 108 .  -...
2800 184. 960 . 96 . 0- ...
                          --------- - - - - - -                                      -    -                  -    ------ -
2450 161. 840. 84. o- -
                          - - - - - - - - - - - - - - - - - - -- - - - - - - - - - -    - - -
                                                                                                - - -  -  - - - -- - - -
I                  I          I                  I                                  I            I 1
2100 138 . 720. 72. o- -    -              I
                                                    - -- -                                    --      -
1750 115. 600. 60. o- -
o- -
o- -
o- -
350 . 23.0  120. 12. 0- ...
. 000 . 00            -
            .000 . 00 v 6.00      12.0
                                                        ..
18.0      24.0
                                                                            .
30.0      36.0      42.0        48.0        54.0
                                                                                                                                        .
                                                                                                                                        .
60.0 4    3    2    1 1 POWER RANGE N-41                                              SECONDS 2 . GROSS ELECTRICAL OUTPUT 3 . CONTROL BANK D POSITION 4 . MEGAWATTS THERMAL CORE                                                                          RUN DATE      : 12/20/89
~SOLID      LINES indicate SIMULATOR DATA                                                                SIM\1.ATOR FILE: PTP-SS2 . SIM
---DASHED LINES indicate REFERENCE DATA                                                                  REFERENCE FILE: PTP-SS2 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS2 DES FDEG F                                    75% POWER 700. 700 .*-
630. 630 ....                                -
a 560. 560      ..      I        I    I    I        I I    I      I I            I 490. 490 .-  .
420. 420 .-  ..
350. 350 .-"'"
280. 280  .--
210. 210  .--
140. 140  .--
70.0 70 . o- -
I
          .000 .00 2    1
                    --      6.00      12.0  18.0 24.0      30.0 36.0
                                                                        .
42.0    48.0      54.0          60.0 1  22 RC LOOP Tc                                    SECONDS 2  22 RC LOOP Th RUN DATE      : 12/20/89
~SOLID    LINES indicate SIMULATOR DATA                                    SIMULATOR FILE: PTP-SS2 . SIM
---DASHED LINES indicate REFERENCE DATA                                    REFERENCE FILE: PTP-SS2 . REF
* SALEM SIMULATOR PERFORMANCE TEST SS2 DEG FDEG F                                      75% POWER 700. 700 .....
630. 630 . -~
a 560. 560 .* ....
I          I T    I I
                                                                  -+    I      I          I 490. 490  .--
420. 420    --
350. 350  .--
280. 280  .--
210. 210  .--
140. 140  .--
70.0 70 . v-
          .000 .00 v-          ..
6.00        12.0  18.0
                                                      ..
24.0    30.0  36.0 42.0    48.0      54.0          60.0 2    1 1  23 RC LOOP Tc                                      SECONDS 2  23 RC LOOP Th RUN DATE      : 12/20/89
- SOLID LINES indicate SIMULATOR DATA                                        SIMULATOR FILE: PTP-SS2 .SIM
---DASHED LINES indicate REFERENCE DATA                                      REFERENCE FILE: PTP-SS2 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS2 DEG FDEG F                                    75% POWER 700. 700 .-...                            -
630 . 630 .-...
2
                      .--                I    I                        I 560. 560 I                    I      I    I            I          I 490. 490 420. 420 .-...                    -
350. 350  .--
280. 280    --
210. 210  .--
140. 140  .--
70 .0 70. o- -
            . 000 . 00 v                  .                              ..      .
2    1        6.00      12.0  18.0 24.0    30.0  36.0 42.0    48.0      5.C.O        60.0 1  24 RC LOOP Tc                                    SECONDS 2 . 24 RC LOOP Th RUN DATE      : 12/20/89
~SOLID    LINES indicate SIMULATOR DATA                                      SIMULATOR FILE: PTP-SS2 . SIM
---DASHED LINES indicate REFERENCE DATA                                      REFERENCE FILE: PTP-SS2 . REF
 
XE 4                                SALEM SIMULATOR PERFORMANCE TEST SS2 LB/HRDEG F                                                            75% POWER 5.00 5.00- ...
4.5o  4.oo- ~
2 4.00 3 . 00- ..... -  - - -  -                                                                I                            I
                                                                                  - - -- - - - - - - - - - - - - - - - - - - - - - - - -
I              -  2 3.50  2 . 00- ~
3.00 1.00- '"
2.50  .oou        - *- -                                                                                                                                    1 1
2.00-1. oo- ~
1.50-2 . 00- -    ----+----+-----+----f------+-------1f------+----~----~-----1
: 1. 00-3 . 00- -
          . 500-4 . 00- ~
                                                            -----'---- -                      -----      _________________                                      ..,...
          .000-5 . 0o+v- - - - + - - - - - + - - - - + - - - - - - f - - - - - - -
* 1 - - - - - - + - - - - - - - 1 f - - - - - - ! - - - - - - - - - - I "
2      1              6. 00      12.0        18.0          24.0          30.0          36 . 0        42.0          48.0        54.0          60 . 0 1  T AVE - T REF DEVIATION                                                    SECONDS 2  21 STM GEN SLOWDOWN FLOW RUN DATE        : 12/20/89
--SOLID LINES indicate SIMULATOR DATA                                                                                            SIMULATOR FILE: PTP-SS2 . SIM
---DASHED LINES indicate REFERENCE DATA                                                                                          REFERENCE FILE: PTP-SS2 . REF
 
                                                  -----***--*-----------                            . ===--=**
                                                                          -==-==:--::::==-=-~-.:-::::          -- -
SALEM SIMULATOR STEADY STATE OPERATION PROCEDURE SSOP-2 75% POWER T~BLE  OF CONTENTS I.                OVERVIEW                                                                              1 II.                REFERENCES-                                                                            1 III.                PERIODICITY                                                                          1 Iv.                INITIAL CONDITIONS                                                                    1
: v.                  ACCEPTANCE CRITERIA                                                                  1 VI.                RECORDING REQUIREMENTS                                                                3 VII.                PROCEDURE                                                                            4 VIII.              TEST
 
==SUMMARY==
7 APPENDIX A - EXPECTED PARAMETER VALUES I.                CRITICAL PARAMETERS                                                    8 Il.              NON-CRITICAL PARAMETERS                                                9 111.
lV.
ENERGY BALANCES MASS BALANCE r,--.._____________
                                                                                  ~
9
                                                                                                            .10 ANS 3.5 PERFO*RMA.NCE
      ". ;';*1*lj ! IlL*l--\ i'
:""\ i '  ~  I '' ' -  'I
                                ...... l,..1 iv'l'
                                        *~
DATA
__ _
      '. j
      ~.a.          ~    J.          *\
            ' . ::_ .....                                              i
                . I  ' ..
-- ----*---*-*- -- -**-*'""" - - ....        *---~ . ,......
: o.            Energy balances shall be satisfied, to within plus or minus 2% between;
: 1.      Reactor power and gross electrical output
: 2.      Tc and SG pressure
: 3.      Reactor power and feedwater -flow E.            Mass balances shall be satisfied for the PZR and the SG's, to ~ithi~ plus or minus 2%.
-*1*"--
'\ ; ' '' '~ '\* f. :-
It:.,
                        ......
                        . '
                        ~-
.~,,-~\..,.,,:_~\
Page 2 of 10
 
VI.                RECORDING REQUIREMENTS A.            Critical Parameters 1*      Power Range NI Channel N41
: 2.      21-24 RC Loop Tc's
: 3.      21-24 RC Loop Th's
: 4.      21 RC Loop Tave
: s.      21 SG Feedwater Fl ow
: 6. . 21 SG Pressure
: 7.      Gross Electrical Output
: 8.      PZR Pressure - narrow range
: 9.      PZR* Level
: 10. 21 SG Level - narrow range
: 11. 21 SG Feedwater Inlet *Temperature
: 12.
* Core The r ma 1 Power B.            Non-Critical Parameters 1*      PZR Temperatur*e
: 2.      Control Rod Bank D Position
: 3.      Terror
: 4.      21 RC Loop Delta - T
: s.      21 SG Slowdown Flow
: 6.      RCS Boron Concentration r  ......
  ., . .      : ; : . \ --;- i~        :~
  ., .    ; : ...* ;-;~ J *~.) l \.
        *.    \    ..-\--!""-\                                                j
:          *.    . ,- '~* .
        ; : I~ . . . . .,., * - I\                    Page 3 of 10
 
*--*--*-----                                                  *--*--------------*--*
VII.        PROCEDURE A.          General
: 1. Record all Critical and Non-Critical Parameters on the Data Recording System. Parameters shall be recorded every 0.5 seconds.
: 2.      The failure of a Critical Parameter, an Energy Balance, or a Mass Balance to meet the Acceptance Criteria of Section V will result in a failure of this test.* Corrective action will be taken and documented using a Discrepancy Report, then this test shall be conducted again.
3,      The failure of a Non-Critical Parameter to meet the Acceptance Criteria of Section V does not result in the failure of this test. Corrective action should be taken and documented using a Discrepancy Report.
: 4.      A Discrepancy Report may be generated, even though a Parameter meets the Acceptance Criteria, if the Test Operator determines that the Parameter could
                                  *be significantly improved.
B.          Sequence of Events Test Operator Initials
                                                                          -----~--
: 1. Establish the Initial Conditions described in Section IV.
                                                                          ----~
: 2. Place the simulator in run and 3.
record data for 1 minute.
End of Test
                                                                          ----ta---~
                                                                  '
SALE!vl
      ~ *,~ ~111
        ""'  I ~
                    !l lTflP.,
                \.,, - J 1
                            ,  l V I Page 4 of 10
: c.                Parameter Comparison Compare the recorded parameters to the Expected Values of Appendix A, using the Acceptance Criteria of Section v.
SAT      UNSAT 1*          Critical Parameters
: a. N41
: b. 21 Tc
: c. 22 Tc
: d. 23 Tc e
* 24 Tc
: f. 21 Th 9*  22 Th
: h. 23 Th i
* 24 Th j
* 21 Tave
: k. 21 SG Feedwater Flow 1
* 21 SG Pressure
: m. Gross MW n
* PZR Pressure
: a. PZR Level
: p. 21 SG Level
: q. 21 SG Feedwater Inlet Temp r
* Core Thermal Power
                                        .t
* Non-rritical Parameters
          <:: .: ' r :-.
                ;:_\I      - *\"                                                            -~5
          '
_,'      *--**
                      , j  j        I .11
"' I :\ ,- '.
  '- I ! ! ' :
I '.    . \ ..,.. , ...,, ~J
: a. rzR Temperature
                                                                                    .PE~*MANCt-- 1 0
-..J l I I j >J 0
                          ._,
                              ' " j i  t
                                          ' *''
U l \ b.        1Bank D Position
        ,, l' 1
                  ... f""'\-.-r'.")
:\/j :l. '- ; -j'          :- I"'(              l i
                                                                                        ,ATA
      .. J *,\....          j I        Page 5 of 10
: c. Terror              -----
: d. 21 Delta-T          -----
e
* 21 SG 8/0 Flow    -----
: 3. Energy Balances
: a. N41/Gross MWE      -----
: b. N41/Core MTW        -----
: c. Tc/SG Pressure      -----
: d. N41/Feedwater Fl ow -----
: 4. Mass Balances
: a. PZR                -----
: b. 21 SG              -----
: c. 22 SG              -----
: d. 23 SG              -----
e
* 24 SG              -----
1I ("\; r,1*1 UL;\ -:-t...., r~
  '-1l\
VII          1*-1...j'*'*l
                        'v J ,
I
!
1 Page 6 of
 
- .- - - * - * - - - - - - - - - - - - - - - - -
VIII.                  TEST
 
==SUMMARY==
 
                                        <For any UNSAT items, include the Salem Simulator Discrepancy Report number)
A.      UNSAT Critical Parameters <this is a critical item)
: s.      UNSAT Non-Critical Parameters
: c.      UNSAT Energy Balances <this is a critical item)
: o.      UNSAT Mass Balances <this is a critical item>
                                                                        --~r*_::al        i
                                                                                  <Signature>
Performance Engineer
                                                                            ,- Salem Simulator ANS 3~5      -
PERFORMANCE
                    '.
                    ;~I
                            ..:. '&deg;"' T :_r- :-\:
                            .~'1                                                    DATA, Page 7 of 10---------.:~.:_._.._~
I I  '- I *- * *
                    '.  '.:          ' ~~ ~
 
APPENDIX A.
EXPECTED PARAMETER RESPONSE FOR STEADY STATE OPERATING PROCEDURE SSOP-2 75% POWER I. CRITICAL PARAMETERS ACCEPTANCE PARAMETER      EXPECTED VALUE              BAND        REFERENCE A. N41                  75%              74.5 - 75.5%        IC-A B. 21 Tc              538aF                528 - 548aF        B C. 22 Tc              538aF                528 - 548aF        B O. 23 Tc              538aF                528 - 548aF        B E. 24 Tc              538aF                528 - 548aF        B F. 21 Th              588a F              576 - 599aF        a G. 22 Th              588aF                576 - 599aF        B H. 23 Th              588aF                576 - 599aF        B I. 24 Th              588aF                576 - 599aF        B J. 21 Tave
* 563aF                552 - 574aF        B K. 21 SG FF            75%                  73 - 77%          B L. 21 SG Pressure    820 psig              804 - 836 psig    B M. Gross MW            820 MW              804 - 836 MW      B N. PZR Pressure    2235 psig            2190 - 2280 psig    B Q. PZR Level            41%                  39 - 43%          B P. 21 SG Level          44%                  42 - 46%          B Q. FW INLET TEMP      397&deg;F                389 - 405*F..      C R. Thermal Power      2558 MWT            2507 - 2609 MWT    C
                                                    ,
                                                        - ANS 3.5        '
SALEM PERFO:Rn~ANCE rI Slrv'1ULATOR l
'
Page 8 of 10              DATA
 
                        *-----------=-=-=-======================--
II. NON-CRITICAL PARAMETERS ACCEPTANCE PARAMETER                EXPECTED VALUE            BAND          REFERENCE A. PZR Temperature              660&deg;F            594 - 726&deg;F            c B. Bank D Position            228 steps        205 - 240 steps        B
: c. Terror                          0            -1. 5 to +l
* 5&deg; F    IC-E
: o. 21 Delta-T                    50&deg;F            45 - 55&deg;F            B E. 21 SG B/D                  40,000 i l l            36,000-          B Flow                          hr*        44,000 lbm/hr F. RCS Boron Cone*                                                      c 111. ENERGY BALANCES ACCEPTANCE PARAMETER                EXPECTED VALUE            BAND          REFERENCE A. N41      @  75%          820 mwe            804 - 836 mwe          B B. N4.1      @  75%          2258 mwt          2507 - 2609 mwt        c
: c. Tc @ 538&deg;F                Ps/g @ 820 psig      804      836 psig    *B
: o. N41 @ 75%                  FF @ 75%              73 - 77%            B Si*\ LEM
                                                      '
ANS 3.5 S1\*11 ;LI*~*TO*R
_,. I ** *._I  ~                                    PER.FOR~1ANCE i\/1 /\ ~Tr:R 11lnv        L~
Page 9 of 10 DATA
 
rv. MASS BALANCES ACCEPTANCE BALANCES              BALANCE VALUE              BAND        REFERENCE
(
A. PZR                            Level @ 41%            39 - 43%          B VCT Level Constant            +/- 2%
B. 21 SG                          SF = FF                  +/- 2%            8 Level @ 44%              42 - 46%
: c. 22 SG                          SF .. =.FF                +/- 2%            8 Leve 1 @ 44%            42 - 46%
: o. 21 SG                          SF = FF                  +/- 2%            8 Level @ 44%              42 - 46%
E. 21 SG                          SF = FF                  +/- 2%            8 Level @ 44%              42 - 46%
ANS 3.5 SALEM
* PERFOHMANCE S1N1ULATOR                                                      DATA
      !\iV'1 i'"\v    c
            ;, ~ "T"I l...~P.\            Page 10 of' 10
 
SALEM SIMULATOR PERFORMANCE TEST SS2 DEG F DEG DEG FDEG F                                                        75% POWER 100 . 630. 700. 700  .- .
90 . 0 620. 630. 630 .-  .
a 80 . 0 610. 560. 560 .-  ..
                                    +-            I t---      I          I      I
                                                                                                  ~
I I
70 . 0 600 . 490. 490  .-..          - - --- -              --
60 . 0 590. 420. 420  .-..
50 . 0 580. 350. 350 . - -- -~ - _ ,j_ ___ ,_
                                                      -- ------- - -            -  -- ~.    -----~ -----      ~  -  ~--            4 4
40 . 0 570. 280 . 280  --
s 30 . 0 560. 210. 210  .- ..
20 . 0 550. 140. 140 10 . 0 540. 70.0 70. o- .-
* 000 530.              -
                .000 . 00 v 6.00        12 . 0
                                                            ..
18.0      24 . 0
                                                                                ..
30.0  36 . 0    42.0  48 . 0      54.0
                                                                                                                                    ..
60 . 0 4      3      2    1 1    21  RC LOOP Tc                                                  SECONDS 2 . 21  RC LOOP Th 3 . 21  RC LOOP TAVG 4 . 21  REACTOR COOLANT LOOP DELTA T                                                          ~ DATE        : 12/20/89
-SOLID LINES indicate SIMULATOR DATA                                                                SIMlLATOR FILE: PTP-SS2 . SIM
---DASHED LINES indicate REFERENCE DATA                                                              REFERENCE FILE: PTP-SS2 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS2 DEG    PCT  PSIG PCT                                                    75% POWER 00 . 120. 1200 120 .
450 . 108. 1080 108.
::. :. ~~: :::n+--        _--- _1  ___----1-----,------, ---              --, ----
                                                                                  - -,--              T - ~-
                                                                                                - -_;___      - -i--  -- -~  r _---=_  -r I                        I 1
1 I_                                I
                          -----------
.ooo  .00  .000 . 001o+- - - - + - - - - - + - - - - + - - - - - + - - - - - - - - - + - - - -.....~----+-----""---~
4    3    2      1          6.00      12.0      18.0        24.0      30.0        36.0      42.0      48.0                    60.0 1 21 STM GEN FEED FLOW                                              SECONDS 2 . 21 STM GEN PRESSURE 3 . 21 STM GEN LEVEL 4 . 21 STM GEN FW INLET TEMP                                                                              RUN DATE      : 12/20/89
~SOLID      LINES indicate SIMULATOR DATA                                                                      SIMULATOR FILE: PTP-SS2 .SIM
---DASHED LINES indicate REFERENCE DATA                                                                        REFERENCE FILE: PTP-SS2 .REF
 
SALEM SIMULATOR PERFORMANCE TEST SS2 DEG F PCT PSIG                                                    75% POWER 700 .  ..0. 250~~ _ _ _ _ 1_ -===~-= ~- ~~ -=-= -_________                          c ___        1_____1____          ~ ____ ~
                                                                                                                                              ~
630. 90.0  242~ -
490. 70.0  226~ --              --"""'--- - - - - - - - ' *        ----
420. 60.0  218~ ..
350 . 50.0  210~ '"
280. 40. 0 2020-=-  ~ - - - -  - - - -  - - - - - -  - - -  -  - - - - -  - - - - -    - - - -  - - - - - -  - - - - - - - - -      ~
210. 30 . 0 1940- -
140 . 20.0 1860- -
70.0  10.0 1780- -    ----1-----~----1-----+------+-------1~----+------i----4-----1
      .00    .000  170 o-t-
:  ----1--*----+-----+------*1------+------i,___----+----~----+*---~
3      2      1            6.00      12.0      18.0      24.0      30.0      36 . 0      42.0        48.0      54.0        60.0 1 PRESSURIZER PRESSURE                                                SECONDS 2 . PRESSURIZER LEVEL 3 . PRESSURIZER VAPOR TEMP RUN DATE      : 12/20/89
~ SOLID    LINES indicate SIMULATOR DATA                                                                      SIMULATOR FILE: PTP-SS2 .SIM
---DASHED LINES indicate REFERENCE DATA                                                                        REFERENCE FILE: PTP-SS2 . REF
 
                                                                                                    -  ----------------
SALEM SIMULATOR PERFORMANCE TEST SS2 MWT STEPS MWE        PCT                                                      75% POWER 3500 230 . 1200 120.-F* ========;::::======::::::::========::::::========-- - - - - - - --========:::========:::::::::======::::::=======- 3 3150 207 . 1080 108 . - ....
2450 161 .
840. 84 . o- :    - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
                                                                                                      ---
                                                                                                      - - - - - - - - - - - - - -
                                                                                                                                                .~
I            I J
I          I 1
2100 138 . 720. 72 . 0- -
1750 115. 600. so .o- -    ---------4----------"'----------
1400 92.      480. 48.0- '"    -----r----+------t-----+------+-----~----+-------li------+----......f 1050 69 . 0  360 . 36 . 0- -  ----+-----+------+-----~----+-------li------+------i----+------1 700 . 46.0    240. 24 . 0- -    ----+-----+------+-----~----+-------li------+------i----+------1 350. 23.0    120. 12 . 0- -
.ooo .ooo .ooo      . oo:o+----+-----+-----+--*----+-------~----+-------l,i------+-----+------'*
4      3      2      1              6.00      12.0        18.0        24.0    30 . 0  36 . 0    42.0        48 . 0      54 . 0      60 . 0 1    POWER RANGE N-41                                                    SECONDS 2 . BROSS ELECTRICAL OUTPUT 3 . CONTROL BANK D POSITION 4 . MESAWATTS THERMAL CORE                                                                                RUN DATE      : 12/20/89
--SOLID LINES indicate SIMULATOR DATA                                                                          SIMULATOR FILE: PTP-552 . SIM
---DASHED LINES indicate REFERENCE DATA                                                                        REFERENCE FILE: PTP-552. REF
 
SALEM SIMULATOR PERFORMANCE TEST SS2 DEG FDEG F                                      75% POWER 700. 700 .*-
630. 630 ....
a 560. 560 .*  -      I        I    I    I        I      I      I        I        I            I 490. 490 ....
420. 420 ....
350. 350 .-'"
280. 280 .  -'"
210. 210  .--
140. 140  .--
70.0 70. 0- ..
                    -
          . 000 .00 -                                                        ..
2    1          6.00      12.0  18.0 24 . 0    30.0  36 . 0 42 .0    48 .0    54 . 0        60 . 0 1  22 RC LOOP Tc                                      SECONDS 2  22 RC LOOP Th Fl.JN DATE    : 12/20/89
---SOLID LINES indicate SI MULATOR DATA                                          SIMULATOR FILE: PTP-SS2 . SIM
---DASHED LINES indicate REFERENCE DATA                                          REFERENCE FILE: PTP-SS2 . REF
* SALEM SIMULATOR PERFORMANCE TEST SS2 DEG FDEG F                                            75% POWER 700. 700    --                    - - -    ----
630. 630 560. 560  .--
                      --                          -  ,_
                                                          -
t-      I I    I I          I
                                                                                                            ---i a
490. 490    --                              --
420. 420    ...
350. 350 .....
280. 280 .....
210. 210 .....
140. 140    ...
70.0 70. 0- ...
          .000 .00'"-                                .                                                              ..
2    1          6.00        12.0      18.0  24.0    30.0  36.0 42 . 0    48.0      54.0          60 . 0 1  23 RC LOOP Tc                                            SECONDS 2  23 RC LOOP Th RUN DATE      : 12/20/89
~ SOLID  LINES indicate SIMULATOR DATA                                                SIMULATOR FILE: PTP-SS2 . SIM
---DASHED LINES indicate REFERENCE DATA                                                REFERENCE FILE: PTP-SS2 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS2 DEG FDEG F                                        75% POWER 700. 700  .--
630. 630 ....
2 560. 560 *
* I-I        I    --+- ---  T        I I
I        I          I            I 490. 490  .--
420. 420  .--
350. 350  .--
280. 280  .--
210. 210  --
140. 140  .-- --
70.0 70. o- -
          .000 .00 v-2    1          6 . 00    12 . 0  18 .0  24 .0    30 . 0 36 . 0 42 .0    48 .0      54 . 0        60 . 0 1  24 RC LOOP Tc                                        SECONDS 2  24 RC LOOP Th RUN DATE      : 12/20/89
-SOLID LINES indicate SIMULATOR DATA                                                SIMULATOR FILE: PTP-SS2 . SIM
---DASHED LINES indicate REFERENCE DATA                                              REFERENCE FILE: PTP-SS2 . REF
 
XE 4                                SALEM SIMULATOR PERFORMANCE TEST SS2 LB/HRDEG F                                                    75% POWER 5.00 5.010- -                                            I 4 . 50 4.010-
* 2 4.00 3.0 0-    -- - - --    - - - - -    -~
J - -- -  I  - - -- I  -- -- I - - - - - - ___I
                                                                                                              ---      I
                                                                                                                          -- - - -      2 3 . 50 2 . 010- *                            - -----        -
3 . 00 1.010-
* 2.50 .00    w                                                                                                    -          1 I        I        I                            I                          1 2.00-1.010- "'                                                                  --  -
1.50-2.0 o- -
1.00-3.0 .-..
          .500-4.0 o- -
          . 000-5 . 0.-.,                                .                                                                        .
2      1          6 . 00      12 . 0    18 . 0    24.0      30.0    36.0      42.0      48 . 0    !54 . 0      60 . 0 1  T AVE - T REF DEVIATION                                          SECONDS 2  21 STM GEN SLOWDOWN FLOW FlJN DATE    : 12/20/89
~SOLID    LINES indicate SIMULATOR DATA                                                              SIMULATOR FILE: PTP-SS2 . SIM
---DASHED LINES indicate REFERENCE DATA                                                              REFEFENCE FILE: PTP-SS2 . REF
 
SALEM SIMULATOR STEADY STATE OPERATION PROCEDURE SSOP-3 100% POWER TABLE OF CONTENTS I.                  OVERVIEW                                                      1 II.                  REFERENCES                                                    1 III.                PERIODICITY                                                    1 IV.                  INITIAL CONDITIONS                                            1
: v.                  ACCEPTANCE CRITERIA                                            1 VI.                  RECORDING REQUIREMENTS                                        3 VII.                PROCEDURE                                                      4 VIII.                TEST
 
==SUMMARY==
7 APPENDIX A - EXPECTED PARAMETER VALUES I.                  CRITICAL PARAMETERS                            8 II.                NON-CRITICAL PARAMETERS                        9 III.                ENERGY BALANCES                                9 I
IV.                  MASS BALANCE ANS_ 3.5, I
I
                            ..... - ...........                i PERFORMANCE DATA    j
  -*. ---.*.. -~* ....... -
 
SALEM SIMULATOR STEADY STATE OPERATION PROCEDURE SSOP-3  100~ POWER I.                    OVERVIEW - This procedure tests the simulator's steady state performance at 100% power and meets the requirements for a 100% pQwer Operability Test described in ANS-3.5 Appendix 8, Section 82.1. The primary technical basis for this prricedure is Salem Unit 2 Statepoint Data ~nd Control Room Readings.
    *II.                      REFERENCES A.            ANSI/ANS - 3.5 - 1985, Appendii 8, Section 82.1
: 8.            Salem Unit 2 Statepoint Data dated 1/9/87
: c.            Salem Unit 2 Strip Charts for 21 SG FF & SF dated 3/12/87 D.            Salem Unit 2 Control Room Readings dated 9/30/87 111.                  PERIODICITY - Annual IV.                  INITIAL CONDITIONS A.              100% Power at MOL
: 8.            Equilibrium Xenon
: c.              A11 Control Systems in AUTO D.              Steady    St~te E.              SG BID at 40;000 lbm/hr F.              Tavg on the Program
: v.                    ACCEPTANCE CRITERIA A.              Instrument error shall not be added to computed values.
: 8.              Critical parameters shall agree.-r'!f.,......,_~_.......!Jlillolll...,....,.____*
                                                                                  %, anAN~lJ.~
values to within plus or minus
----------------d~e~t~r~a~c~t from training.
('"\
* 1  1 ::r**    11      Non-Critical parameters sha 11 a
                                                                                  ~P.&#xa3;~6HM~ij~~t e
                  ~,~.Li_:Vl values: to within plus or minus
                                ,-,""d.~trac:t            from training.
      *:'*'
* 1 , 1
      '. : : "ii
        . .,,, . I . j
                            ; ...:. 1' l it(
                        ~- '-i    '      ' ../ J \
                                                      !
                                                      *i DATA
                          .--** - ......                          Page 1 of 10
----------*""*-*------~-_, ..                    _-
: o.      Energy balances shall be satisfied, to within plus or minus 2% between; 1 *. Reactor power and gross electrical output
: 2. Tc and SG pressure
: 3. Reactor power and feedwater flow E.      Mass balances shall be satisfied for the PZR and the SG's, to within plus or minus 2%.
t'\1\I
      ~hLClVI r~.1                                          ANS 3.5 I
i PERFO:RMANCE DATA I
j
  ----- --
        ..    ......_ ____          Page 2 of 10                        J I
 
VI. RECORDING REQUIREMENTS A.      Critical Parameters
: 1. Power Range NI Channel N41
: 2. 21-24 RC Loop Tc's
: 3. 21-24 RC Loop Th's
: 4. 21 RC Loop Tave
: 5. 21 SG Feedwater Flow
: 6. 21 SG Pressure
: 7. Gross Electrical Output
: 8. PZR Pressure - narrow range
: 9. PZR Level
: 10. 21 SG Level - narrow range
: 11. 21 SG Feedwater Inlet Temperature
: 12. Core Thermal Power B.      Non-Critical Parameters
: 1. PZR Temperature
: 2. Control Rod Bank D Position
: 3. Terror
: 4. 21 RC Loop Delta~  T
: 5. 21 SG Blowdown Flow
: 6. RCS Boron Concentration ANS 3.5
(' /' ~ ~:\,;1 v1'.L.:..;=:1                              PERFO:RMANCE DATA Page 3 of 10
 
VII.        PROCEDURE A.      General
: 1.      Record all Critical and Non-Critical Parameters on the Data Recording System. Parameters shall be recorded every o.s seconds.
: 2.      The failure of a Critical Parameter, an Energy Balance, or a Mass Balance to meet the Acceptance Criteria of Section V will result in a failure of this test.* Corrective act ion wi 11 be taken and documented using a Discrepancy Report, then this test shall be conducted again.
: 3.      The failure of a Non-Critical Parameter to meet the Acceptance Criteria of Section V does not result in the failure of this test. Corrective action should be taken and documented using a Di~crepancy Report.
: 4.      A Discrepancy Report may be generated, even though a Parameter meets the Acceptance Criteria, if the Test Operator determines that the Parameter could be significantly improved.
B.      Sequence of Events Test Operator In~/
: 1.      Establish the Initial Conditions described in Section IV.              ---~
: 2.        Place the simulator in run and record data for 1 minute.            ___&#xa3;&#xa3;____ _
: 3.      End of Test SALEP/1                                            ANS 3.5
    ~ *1*~;11 n
    \.,,i l * ! v
                      !' r n1 J_,'-\ l 'J R
                                "-*.
l                        PERFOHMANCE DATA Page 4 of 10
: c.              Parameter Comparison Compare the recorded parameters to the Expected Values of Appendix A, using the Acceptance Criteria of Section v.
SAT    UNSAT 1*      Critical Parameters
: a. N41                                      -----
: b. 21 Tc                                    -----
: c. 22 Tc                                    -----
: d. 23 Tc                                    -----
e
* 24 Tc                                    -----
: f. 21 Th                                    -----
: g. 22 Th                                    -----
: h. 23 Th                                    -----
: i. 24 Th                                    -----
j
* 21 Tave                                -----
: k. 21 SG Feedwater Flow                      -----
l . 21 SG Pressure                          -----
: m. Gross MW                                  -----
n
* PZR Pressure                            -----
: 0. PZR Level                              -----
: p. 21 SG Level                                -----
: q. 21 SG Feedwater Inlet Temp              -----
                ,'.. ,:J.*; -,.12.
r
* Care Thermal Power Non-Critical Parameters
                                                                                    ,                -----
a *.l PZR Temperature t  , .. '~j v*;        L    -~"';
(' ' \ ,, f . I
        ,' r ; \ j J i ; ~
J 1J  I  J *._;  -* *
                                    ' -
l i .:I o
                                          ..._ ;"')
:
                                          ..,,,/
                                                  ~-:
                                                  ,1, \
l 1
b.J Bank D Position PERF      ANCE~-
_____________l                                                                DA A
___.......__                                                1          Page 5 of 10
 
Co  Terror                            -----
: d. 21 Delta-T                        -----
e
* 21 SG B/D Flow                    -----
: f. RCS Boron Concentration            -----
: 3. Energy Balances
: a. N41/Gross
                                        . MWE                      -----
: b. N41/Core MTW                      -----
: c. Tc/SG Pressure                    -----
: d. N41/Feedwater Flow                -----
: 4. Mass Balances
: a. PZR                                -----
: b. 21 SG                              ------
: c. 22 SG                              -----
: d. 23 SG                              -----
e
* 24 SG                            -----
I ~ J 1\/1
  \.I
* SALE~~
I\ t ll }~TC*
                .J : - '
* I R1*
                                \
ANS 3.5 PERFORMANCE DATA
        "'l 1 "'cR*r
        *\1 L~
Ii I f\ *. i ,-
                  \V * ..._,
Page 6 of 10
 
VIII. TEST
 
==SUMMARY==
 
      <For any UNSAT items, include the Salem Simulator Discrepancy Report number)
A. UNSAT Critical Parameters <this is a critical item>
B. UNSAT Non-Critical Parameters
: c. UNSAT Energy Balances (this i~ a critical ite~)
: o. UNSAT Mass Balances <this is a critical item)
SAT.
ANS 3.5 PERFOHMANCE DATA Page 7 of 10
 
APPENDIX A EXPECTED PARAMETER RESPONSE FOR STEADY STATE OPERATING PROCEDURE SSOP-3 100% POWER I.      CRITICAL PARAMETERS ACCEPTANCE PARAMETER                              EXPECTED VALUE                BAND        REFERENCE A. N41                                      100%                  98 - 102%      IC-A
: s. 21 Tc                                    537* F                527 - 547*F      B
: c. 22 Tc                                    537&deg;F                527 - 547*F      B D. 23 Tc                                    537&deg;F                527 - 547*F      B E. 24 Tc                                    537*F                527 - 547*F      B F. 21 Th                                    601*F                589 - 613*F      B G. 22 Th                                    601 a F              589 - 613&deg; F      B H. 23 Th                                    601&deg;F                589 - 613&deg; F      B I*    24 Th                                    601&deg; F                589 - 613&deg; F      B J. 21 Tave                                  569&deg;F                558 - 580&deg;F      B K. 21 SG FF                                  100%                  98 - 102%        c L. 21 SG Pressure                            790 psig              775 - 805 psig    B M. Gross MW                                1150 MWE              1127 - 1173 MWE    D N. PZR Pressure                            2235 psig            2190 - 2280 psig    D
: o. PZR Level                                  54%                  52 - 56%        D P. 21 SG Level                                44%                  42 - 46%        D Q. FW Inlet Temp                            428&deg;F                419 - 437*F      B R. Thermal Power                            3411 MWT              3343              B ANS 3.5 SALE!Vl                                                                PERFOHMANCE v~1r~111  .J Lf"'. :
                          ,\-;-nR  .J t DATA rv1I'''\ ,. .. ..,. . ,. ':'""-
{"',\) l *-* \
i  -  ...;
Page 8 of 10
 
II. NON-CRITICAL PARAMETERS ACCEPTANCE PARAMETER        EXPECTED VALUE          BAND          REFERENCE A. PZR Temperature      660&deg;F            594 - 726&deg;F          D
: s. Bank D Position    228 steps          206 - 240 steps      D
: c. Terror                0            -1.5 to +l
* 5&deg; F    lC-F
: o. 21 Delta-T            64&deg;F            58 - 70&deg;F          8 E. 21 SG B/D        40,000 .11J2.          36,000-          lC-D Flow                    hr          44,000 lbm/hr F. RCS Boron Cone    633 ppm            570 - 696 ppm 111. ENERGY BALANCES ACCEPTANCE PARAMETER        EXPECTED VALUE          BAND          REFERENCE A. N41 @"100%          1150 mwe          1127 - 1173 mwe        D
: s. N41 @ 100%        3411 mwt          3343 - 3479 mwt        B
: c. Tc @ 537&deg;F      Ps/g  @  790 psig    775    805 psig      B
: o. N41 .@ 100%      *FF  @  100%          98 -
* 102%          c
                                                                      . I ANS 3.5 PER.FO:RMANCE Page 9 of 10            DATA
 
IV. MASS BALANCES ACCEPTANCE BALANCES      BALANCE VALUE            BAND        REFERENCE A. PZR                Level @ 54%            52 - 56%          D VCT Level Constant          +/- 2%
B. 21 SG              SF = FF                +/- 2%            c Level @ 44%            42 - 46%          D
: c. 22 SG              SF-.= FF                +/- 2%            c Level @ 44%            42 - 46%          D
: o. 23 SG              SF = FF                +/- 2%            c Level @ 44%            42 - 46%          D E. 24 SG              SF = FF                + 2%            c Level @ 44%            42 - 46%          D
                                            '      ANS 3.5 SALEM SIMULATOR                                  PERFO,RMANCE MASTER                                          DATA Page 10 of 10
 
SALEM SIMULATOR PERFORMANCE TEST SS3 DEG F      DEG DEG FDEG F                                        100% POWER 100 . 630.      700. 700    --
90 . 0 620. 630 . 630 2
    .o    610. 560 . 560  .--      I      I      I    I            I I    I      I          I            I r
70
* 0 600.      490 . 490    --      I T
60 . 0 590.      420. 420    .. ...                --*- -
_
                                ~---- 1 ---- ~ ---- , ---- 7 ---- r ---- ~ -------- ~ ---- ~ -----
                                                            .....
                                                                        -
0 . 0 580. 350
* 350      ...
40.0 570.      280 . 280 I                                    -
30 . 0 560. 210 . 210  .--
20.0 550.      140 . 140  .--
10.0 540.      70 . 0 70 . o- -
  . 000 530.                -
                  . 000 . 00 w 6.00    12.0    18.0 24.0        30.0  36.0
                                                                                    ..
42.0  48.0
                                                                                                      -,.
54.0          60.0 4      3      2    1
  -      1
* 21 RC LOOP Tc                                          SECONDS
-        2 . 21 RC LOOP Th
-        3 . 21 RC LOOP TAVG XE 0
-        4
* 21 REACTOR COOLANT LOOP DELTA T                                            RUN DATE          12/20/89
---SOLID LINES indicate SIMULATOR DATA                                                SIMULATOR FILE: PTP-SS3 . SIM
---DASHED LINES indicate REFERENCE DATA                                                REFERENCE FILE: PTP-SS3 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS3 DEG    PCT  PSIG PCT                                          100% POWER 00 . 120. 1200 120.
450 . 108. 1080 108.
400 . 96.0    960. 96.
                              - - - - - - + - - - --
                          ------------------------------------------------~
3 2    1          6 . 00    12 . 0    18.0 24 . 0    30.0 36.0 42.0    48 . 0    54.0          60.0
-      1 . 21 STM GEN FEED FLOW                                    SECONDS
-      2
* 21 STM GEN PRESSURE
-      3
* 21 STM GEN LEVEL
-      4
* 21 STM GEN FW INLET TEMP                                                  RUN DATE      : 12/20/89
-SOLID LINES indicate SIMULATOR DATA                                                SIMULATOA FILE: PTP-SS3 . SIM
---DASHED LINES indicate REFERENCE DATA                                              REFERENCE FILE: PTP-SS3 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS3
                                                                  ----~ ---_1~=---'- ---~ --_T _--~
DEG F PCT PSIG                                              100% POWER 700. 100. 250 r                    0-~    - - - -'- - - - _' _ -  - - ~ ~=--
                                                            -
630. 90.0 242'0- *
                                                                      -
560. 80.0 234 o- -
490. 70.0 22610- -                                                --        -      -              ---                1 420. 60.0 21810-
                        .                        --- -- t - I            I        I          I          I            I
                          --------- . ---- . ---- . ---- . ---- . ------------- . ---- -                                          2 2
350. 50.0 210,o- ...                                                -
280. 40 .0 202:o- -
210. 30.0 194o- -
140. 20.0 186,o- -
10- -
l            .000 170 v 2    1
                      -
6.00      12 .0      18.0 24 .0    30.0
                                                                                .
36 . 0  42 .0      48 .0      54.0          60 . 0 1 . PRESSURIZER PRESSURE                                      SECONDS 2 . PRESSURIZER LEVEL 3 . PRESSURIZER VAPOR TEMPERATURE RUN DATE      : 12/20/89
~SOLID    LINES indicate SIMULATOR DATA                                                      SIMULATOR FILE: PTP-SS3 . SIM
---DASHED LINES indicate REFERENCE DATA                                                        REFERENCE FILE: PTP-SS3 . REF
 
S ALEM SIMULATOR PERFORMANCE TEST SS3 MWT  STEPS  MWE  PCT                                                      100% POWER 3500 230. 1200 120 .* ::.. - - - - - - -
                          -------------------
                                            - -  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
                                                                                                                                                  ---- a          3 3
3150 207. 1080 108 . ...
96.0* ..
450 161. 840. 84 . 0*
100 138. 720. 72 . 0- -
1750 115. 600. 60 . 0- -
1400 92.0    480. 48 . 0- -
1050 69.0    360. 36 . 0* -
700 . 46.0  240. 24 . 0--
350 . 23.0  120. 12 . 0- -
* 000 . 000
* 000 . 000,- + - - - - - - + - - - - - + - - - - - - + - - - - + - - - - - + - - - - + - - - - - +* -- - - - - - - - - - l'i - - - - - - - 1 4    3    2    1              6 . 00    12 . 0      18 . 0      24 . 0      30 . 0      36 . 0      42 . 0        48 . 0        ~.o                60 . 0
-    1 . POWER RANGE N-41                                                      SECONDS
-    2
* GROSS ELECTRICAL OUTPUT
-    3
* CONTROL BANK D POSITION
-    4
* MEGAWATTS THERMAL CORE                                                                                          RUN DATE        : 12/20/89
-SOLID LINES indicate SIMULATOR DATA                                                                                    SI MULATOR FILE: PTP- SS3 . SI M
---DASHED LINES indicate REFERENCE DATA                                                                                  REFERENCE FILE: PTP-SS3 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS3 DES FOES F                                        100% POWER 700. 700  -                                                  -----
630. 630 .*... -    *-
                                                                                          +-
2 560. 560  -          I      I        I    I        I    I        I  -                I 490. 490  ...                    ---*    -  -
420. 420 .--
350. 350 .--
280. 280 .--    -.
210. 210 .--
140. 140 .--
70.0 70. o- -
            .000 .oo -
v
                                          ..              ..
2    1            6.00    12.0      18.0 24.0      30.0 36.0    42.0      48.0      54 .0        60.0 1  22 RC LOOP Tc                                          SECONDS 2  22 RC LOOP Th RUN DATE      : 12/20/89
~SOLID    LINES indicate SIMULATOR DATA                                                SIMULATOR FILE: PTP-SS3 . SIM
---DASHED LINES indicate REFERENCE DATA                                                REFERENCE FILE: PTP-SS3 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS3 DES FDEG F                                  100% POWER 700. 700  .--                        -
630. 630  ....                                                              -
2 560. 560  .--        I      I      I    I      -~      I    I      I          I
                                                                                                    -1 490. 490  .--                    - ---
420. 420 .-... --
350. 350  .--
280. 280  .--
210. 210  .--
140. 140  .-- -
70.0 70. o- -  --      -
            .000 .00 v-
                                .                    .              ..
2    1          6 .00    12.0    18.0 24.0    30 . 0 36.0 42.0    48.0      54 . 0        60.0 1  23 RC LOOP Tc                                    SECONDS 2  23 RC LOOP Th RUN DATE      : 12/20/89
--SOLID LINES indicate SIMULATOR DATA                                          SIMULATOR FILE: PTP-SS3 . SIM
---DASHED LINES indicate REFERENCE DATA                                        REFERENCE FILE: PTP-SS3 . REF
 
SALEM SIMULATOR PERFORMANCE TEST SS3 DES FDEG F                                        100% POWER 700. 700  .--
630. 630  .--
2 560. 560  .--      I        I    I        I          I    I    I      I          I --1 490. 490  .--                    -    --
420. 420 .-...                    -  -
350. 350 .....
                      .-
280. 280 ...
210. 210  .--
140. 140 .-...
70.0 70 . 0- ...
          .000 . 00 v-                                                        .                  ..            ..
2    1          6.00      12.0  18.0    24 . 0    30 . 0 36.0 42.0    48.0      '54.0        60.0 1  24 RC LOOP Tc                                          SECONDS 2  24 RC LOOP Th RUN DATE      : 12/20/89
~SOLID    LINES indicate SIMULATOR DATA                                            SIMULATOR FILE: PTP-SS3 . SIM
---DASHED LINES indicate REFERENCE DATA                                            REFERENCE FILE: PTP-SS3 . REF
 
XE 4                                    SALEM SIMULATOR PERFORMANCE TEST SS3 LB/HRDEG F                                                            100% POWER 5.00 5.00- -
4.50 4.00- ..
1 2
4 . 00 3. oo- ---      --  _ j_    -  - -  - - - - -  - - - -  _  -  -  - -  .!... - - - - !..... - - - -  -  - - -  -  - -- - -  -  - -  -    -  2 3 . 50 2 . 00- ""
3 . 00 1.00- ..
I 2.50 .000-.- : -  --    -  - "-- - --  -+--~----~,---~-~.~~--- -~*---- r-- -----'-*-------~-----~-- ~-~-                                              1 2 . 00-1.00- '-  ----+----+-----+-----+------+-----~
: 1. 50-2 . 00- ..
1.00-3.00- ""    ----+----+-----+-----+------+----+------+------1-----4-----1
            . 500-4 . 00- -
            . 000-5 . 0l tr+
                        ~ -----+-------+-            * -----+--------~      *    -----4--------+-------+---------ll---------+---------i 2      1              6.00          12.o      18.0      2*t. O          30.0          36 . 0        42.0        48.0        54 .0        60 .0 1  T AVE - T REF DEVIATION                                                      SECONDS 2  21 STM GEN SLOWDOWN FLOW RUN DATE        : 12/20/89
--SOLID LINES indicate SIMULATOR DATA                                                                                          SIMULATOR FILE: PTP-SS3 .SIM
---DASHED LINES indicate REFERENCE DATA                                                                                        REFERENCE FILE: PTP-SS3 .REF
 
RX. ENG. MAN. PART 2 SECTION 2.6 CALORIMETRIC CALCULATION DATA SHEET Date -""'-'-11._/""""'1i....,,./_..e.._9..__ Time  o33o          Recorded By I            '
Gross Gen. Output -""11_Si_o...._._.M".fa                        RCS Boron Cone        S9/2.-      cpm Control Bank Position                          Bank  D      at ;'Z I    steps Tave - Tref .i O.S&deg;F:                        *T error -----OF0 0
Loop      2!-
Tave (Console) F                                                                              ~&1. ~
0 Delta T (Console) F Steam Pressure                                    1 '300        . 1 f:Joo    1  8t:J(J    1 900 (PSIG)                          2                          2              2 3
2 ---
3          3              3 Avg 9tJo      Avg  8tJo  Avg ~ Avg Si CID Slowdown Flow (lbs/hr)                                      {')                      Cf Total Slowdown            D Feedwater Temp. &deg;F Feedwater Flow Delta P (Inches)
NIS      ~hannel        N41            N42        N43            N44 Indicated Power (during Calorimetric)                              91/. 8        1 t/ B      91 $          t/o/7. ~
Calculated %RTP (Sect. 2. 7)                                      &#xa3;Lt 7            fC/ 7      11, 7          99- 7 Difference or ... 7-Cal)                              #  I          ., I        I  I          *I If calorimetri~ - .~ <98% a tolerance no more negative than -2.0% is permissible for difference CNIS-CAL)~
If Calorimetric power ~98% a tolerance no more negative than -1.0% is permissible for difference (NIS-CAL) and the average of the                                              's shall be equal to or greater than the calo *                                      .                          /
NIS power after adjustment                                                        ANS 3.5.                  /*
Sr. Reactor Operator --~------------------11---------~-=r"ll PERFORMANCE *iss DA OGT 2 9 .
Salem Unit 2                                          Page* 4 of S                        REM Par.t 2
 
RX. ENG. MAN. PART 2 SECTION 2.6 CALORIME'l'llIC CALCULATI.OR VORK SBIE'l'
.
STEAM GEN. ENTHALPY RISE                Date _ _ _ Time _                          M1fe _    gross
* i:.oop 21 Feed.water 0
Temp. ( !')
                ~32**
r.v. Enthal~y Btu/lbm
{Table 4)
                                      <It
* Steam B~o psiq Pressure psia.
                                                                        &#xa3;311tf Steam Enth.
Btu/lbm (Tabla 4)
Delta H=hg-hf Btu/lbm 787-b 22
                </13'J.    <I        &#xa2;1/                      ()0      Si1l/;.7 23
                ~32**                t.P1/                    DO      e, ,,/;. 7 24
                </-13 '2 . .;      </;1                  ~00            ,ii, 7                            787.~
Venturi                            S'q. Root ot            Therm. Expan                            Flow =.Const x Delta P            ./Delta P
* Sp Vt vy-                    Factor (Fa)                            Fu~
Loop    (inches H20)                          (Table 4)              (Table. 4)        Flow Const.              lbm/hr 21        V/4                                                            -
                                                                                  .-'
18978        . '5./Y..LDfo 22        tJ  /4                                                      -_...                18997
                                                                                                                  *3.)\t'vl.
23 24
                ;l;/{J
                  !U/(Y,
                                                                            ---
                                                                              -
__.
19139 19023 3 .7 Y.. Lc/::;
::,:lXtiJL
* Loop 21 Delta H Btu/lbm Flow lbm/hr Power Delta. H x Flow Btu/hr
: 2. t/11/ 'X.t    i) 9 22 I)(. I tJ 9
23                                              ~      (J 9          Pump heat, Slowdown          Thermal 24*                                                        ?            (Fig. 21)            Power
: z.            X..10 Sum heat gain J. lt::.6 ~' {)
FO t/1/. 2S)u .f~ =    /, Jt,1 ID Thermal Power                            /* 1tl~X tu 9
            % Rated Thermal Power          x 100    =  11.6388xlo x 100                =
7                                      988 Power rounded to the nearest tenth of a percent =                              19.                              OGl 2.'.9 '
Record this power on t~etric* Calculatioil Data She Completed    By    *at.Ji~                                    Date    II          l3
* Salem Unit 2                                                    Page 5      of  5
                                                                                            , _ _ _ _ _ _ _ _ __.._ Part 2
 
SALEM SIMULATOR STE.ADY STATE OPERATION PROCEDURE SSOP-4 SIMULATOR ST.ABILITY TABLE OF CONTENTS Page I.      OVERVIEW                                                1 REFERENCES                                              1
                                                                        ...
II.
II I. PERIODICITY                                            1 IV.      INITIAL CONDITIONS                                      1
: v.      .ACCEPTANCE CRITERIA                                    1 VI.      RECORDING REQUIREMENTS                                  3 VII. PROCEDURE                                              4 VII I. TEST
 
==SUMMARY==
7
                                                      ' PERFORMANCE ANS 3.5 c-....    ...-**~.-L*.,,,*----
i                DATA
 
                          ------- ------ - - - - - - - ------------*----- -- ---------------*----------~*---*- ------
SALEM SIMULATOR STEADY STATE OPERATION PROCEDURE SSOP-4 SIMULATOR STABILITY I.        OVERVIEW - This procedure tests the simulator's steady state performance at 100% power for 60 minutes and meets the requirements for a 100% power Operability Test C stability verification> described in ANS-3. 5 Appendix B, Section 82. 1.
I I.      REFERENCES A. ANSI/ANS - 3. 5 - 1985,          Appendix B,              Section 82.1 I I I. PERI ODI CI TY - Annual IV.      INITIAL CONDITIONS
                                                                                                                .-
                                                                                                                '
A. 100% Power at MOL B. Equilibrium Xenon
: c. Al'l Control Sys terns in AUTO D. Steady State E. SG BID at 40,000 1 bm/ hr F. Tavg on the Program V.      ACCEPTANCE CRITERIA A. Instrument error shall not be added to computed values.
B. All parameters shall vary within a band of no more than plus or minus 2% o~ the initial value.
SALEM                                                                        ANS 3.5 S!r~ULATOR PERFORMANCE fv*1ASTER                                                                          Dt\TA Page 1 of 6
 
VI. RECORDING REQUIREMENTS*
A. Critical Parameters
: 1. Power Range NI Channel N41-
: 2. 21-24 RC Loop Tc's
: 3. 21-24_ RC Loop Th' s
: 4. 21 RC Loop Tave
: 5. 21 SG Feedwater Flow
: 6. 21 SG Pressure
: 7. Gross Electrical Output
: 8. PZR Pressure  - narrow range
: 9. PZR Level
: 10. 21 SG Level - narrow range
: 11. 21 SG Feedwater Inlet Temperature
: 12. Core Thermal Power B. Non-Critical Parameters
: 1. PZR Temperature
: 2. Control Rod_ Bank D Position
: 3. Terror
: 4. 21 RC Loop Delta - T s:  21 SG Blowdown Flow
: 6. RCS Boron Concentration
                                              ,  ANS 3.5 SALEr~
PERFOR~~ANCE S!r/iULATOR DATA MASTER Page 2 of 6
 
VI I. PROCEDURE A. General
: 1. Record all Critical and Non-Critical Parameters on the Data Recording System. Parameters shall be recorded every 0. 5 seconds.
: 2. The failure of a Critical Parameter, an Energy Balance, or a Mass Balance to meet the Acceptance Criteria of Section V will result in a failure of this test. Corrective action will be taken and documented using a Discrepancy Report, then this test shall *be conducted again.
: 3. The failure of a Non-Critical Parameter to meet the Acceptance Criteria of Section V does not result in the failure of this test. Corrective action should be taken and documented using a Discrepancy Report.
: 4. A Discrepancy Report may be generated, even though a Parameter meets the Acceptance Criteria, if the;*
Test Operator determines that the Parameter could*
be significantly improved.
B. Sequence of Events Test Operator Initials
: 1. Establish the Initial Conditions described in Section IV.              ___ f1_
: 2. Place the simulator in run and record data.for 60 minutes.
: 3. End or Test I
SALEM                                          ANS 3.5 SIMULATOR PERFO-RMANGE DATA1 rv1ASTER Page 3 of 6 I
 
                                                              ----** *- ~------
C. Parameter Stability Evaluate parameter stability, using the Acceptance Criteria of Section V.
SAT        UNSAT
: 1. Critical Parameters
: a. N41
: b. 21 Tc
: c. 22 Tc
: d. 23 Tc
: e. 24 Tc
: r. 21 Th
                                                                          ..
g, 22 Th                                      -----. '.
: h. 23 Th
: i. 24 Th j, 21 Tave
: k. 21 SG Feedwater Flow
: 1. 21 SG Pressure
: m. Gross MW
: n. PZR Pressure
: o. PZR Level
: p. 21 SG Level
: q. 21 SG Feedwater Inlet Temp
: r. Thermal Power
: 2. Non-Critical Parameters SALEM
: a. PZR Temperature              M~-    .5. ----
: b. Bank D Position
                                                      ~~MANC-E~-
SI r\ti ULAT OR
  ~!11\STER                    Page 4 of 6 DATA
: c. Terror
: d. 21 Delta-T
: e. 21 SG BID Flow
: f. RCS Boron Cone SALEM                                ANS 3.5 S~~v1ULATOH                            PER_tORMANCE f_ . l\;1 .~STER 1\11/"*~
* DATA Page 5 of 6
 
VI I I. TEST
 
==SUMMARY==
 
        <For any UNSAT items, include the Salem Simulator Discrepancy Report number>
A. UNSAT Critical Parameters B. UNSAT Non-Critical Parameters r    ANS 3.5 SALEM.
SJrAULATOR                                  PERFORMANCE MASTER                                        Ol\TA Page 6 of 6
 
SALEM SIMULATOR PERFORMANCE TEST SS4 DEB F DEG DEG FDEG F 100 . 630. 700 . 700        -- -*-  -        --
                                                      --r-- ---r                      SIMULATOR STABILITY l--1~~--1-~
TI                                    I I          I i                                    I I                                    I I                !          I 90 . 0 620. 630. 630 ...      - - - - +--
I
                                                  -
i-    --            I i*
I r'        ...        t        -
I 2
I I                                                                            I 560 . 560 .-...            i                I                  I I            I I
                                                                                            -                      -          -                tI  -                --    1' I
r-80 . 0 610.
t            I                      t              l 1
I I
I I          I I                        I 70.0 600.      490 . 490 .-... ___J _ -
I
                                                        -
                                                          '
                                                          .-
iI
                                                                -  --
l
                                                                              ~
                                                                              '
                                                                                    -    -- -  T' i
                                                                                                            ~
I
:
iI            t          f I I
l
                                                                                                                                    '                      I I
60 . 0 590 . 420. 420 .-
I                  'I I
ii
                                                                                                                                                    --
                                                                                                                                                        --t-      ----
i                I          I          I I
I
: 50. 0 580 . 350 . 350 .-    -  - - - ;-----            +*-    --- ---      ~  - -- -  -  -;
                                                                                                      -i-            +            +          t          t' i
J                  I I
I I
I I          I            I          I I
I I
I
                                          !                                    I 40 . 0 570 . 280. 280 .--    -          I    -  - -  _ .J__ ___ -    --          -  -    -+
                                                                                                  '
                                                                                                            ~          t-                                                                                                                                                          It          I t-I                                    I                            3 I                                                                                    I I                                                                                                                  '
I II i                                                                                                I
                                                                                                                                                !
I i
I 30 . 0 560. 210 . 210 .--  --
                                    --t    I
                                              -- - -
I l
I I
                                                                  -- -- -    i      -          I*
l II I
I r          t I              r
                                                                                                                                                +
I I
j I
                                --t-
                                          !I                                                                I ANS 3.5 I
I 20 . 0 550. 140 . 140 .--                        -      !--
l
                                                                    -    --  .. -    --      I-        t I
I
                                                                                                                                                                        -
PERFO*RMANlCE I        I I
                                                                                                  !                    I            i I        I                        I I
                                                                              .                                          -- -- ---:eMA- r-- --
I
                                                            '                                                                        I 10 .0 540. 70 .0 70 . o- -      -  rI --                            -
I
                                                                                                  ~    - --r
                                                                                                            !
                                                                                                              - - -~*
I
                                                                                                                                                                          -
i                                                      I I                                    I                I          I          i            I            I          l I
  . 000 530.  . 000 . 00 w 4    3      2    1              360.            720.                1080            1440      1800        2160          2520        2880      3240            3600 1 21 RC LOOP Tc                                                                              SECONDS 2 . 21 RC LOOP Th 3 . 21 RC LOOP TAVG                                                                                                                                        XE 0 4 . 21 REACTOR COOLANT LOOP DELTA T                                                                                                RUN DATE            11/21/89
~SOLID      LINES indicate SIMULATOR DATA                                                                                                SIMULATOR FILE: PTP-SS4.SIM
---DASHED LINES indicate REFERENCE DATA                                                                                                  REFERENCE FILE: N/A
 
SALEM SIMULATOR PERFORMANCE TEST SS4 DEG 500 .
PCT 120 .
PSIG PCT 1200 120 .      --- - --r -- -
I
                                                    --,----
                                                        '    TI SIMULATOR STABILITY l
I
                                                                                            -T      - r-- -
                                                                                                            ---r-1I 450 . 108. 1080 108 .
t            +                                      l.
                                                                                              '
r I
4 1
400 . 96.0    960. 96 .
I II iI                                                            II 350 . 84.0    840. 84 .                J_
                                          !
                                                        ~
I
                                                                    - ...,I I
                                                                                                    -t --        l I
I
__ J 2
I I                                I
                                                                                                                  ~
300 . 72.0    720. 72 .                                j                                tI I
I
                                                        !
I                I            I 250 . 60.0    600. 60 .                  t I
t-              l              J    t--    - t I'
i I
I 1
I          I j                                      I                  I i
200 . 48.0    480. 48 .
3 150 . 36.0    360. 36 .                - + - --- -  - L                          .._
                                                                                  '
                                                                                      -
I I
100 . 24.0    240. 24 .                  +--                                    t I
f 1
                                          '
I 50 . 0 12.0    120. 12 .            ----+--                  t I
. 000 .000    . 000 . OOc i-t-~~~~t--~~~~~~~~.--~~~-t-~-~--1,..._-~~-t-~~~--1~~~~-+-~~~--+~~~~
4      3      2    1              360.          720. 1080    1440      1800    2160 2520    2880      3240        3600 1    21 STEAM GENERATOR FEED FLOW                                    SECONDS 2 . 21  STEAM GENERATOR PRESSURE 3 . 21  STEAM GENERATOR LEVEL 4 . 21  STH GEN FW INLET TEMP                                                                RUN DATE        11/21/89
~SOLID LINES indicate SIMULATOR DATA                                                              SIMULATOR FILE: PTP-554 .SIM
---DASHED LINES indicate REFERENCE DATA                                                            REFERENCE FILE: N/ A
 
S ALEM SIMULATOR PERFORMANCE TEST SS4 DEG F PCT PSIG                                          SIMULATOR STABILITY 700. 100. 250                                                                                                  y- ----,
T r
I            1                      r  1          r-        I I
                        - -i------ r--- --~--- --
3 630. 90 . 0 242
                                          !
r-1                    l                                                    I I
                        - - t---- ---
I 560. 80.0 234                                  +-  -                                          - ---1-1 I
490. 70 . 0 226 I
t-      t                                                r            - + -
                                                                                                                      +----1          1 I -~
I                                                      I t
                                  '
l i
                                                                              +
I r
I I
                                                                                                            +
I                2 350. 50.0 210                                                                            I 280. 40.0 202            l.
I I
I r
I                                                I I
                                                                                                \
t- -
I --
I 1
I
                                                                              *- --- -r I
210. 30.0 194            ~        t          t-    -    -r                            I
                                                                                                                -            --
ANS 3.5
                                                                    !
I I        i                        I 140. 20.0 186    - --- t  I l--
I            t-* -      +              ~
PERFO:RMANCE-I          I            I I
I                      I DAT~
I
                        --+-----
I                      I                          I I
                                              - -*--+ -        ---t I
I
                                                                            ---+-- - - -- -iI
                                                                                                    -- -            -+---
I I
I II I                                  I F          I I
I I
360. 720.        1080          1440      1800        2160 2520      2880      3240          3600 1 . PRESSURIZER PRESSURE                                            SECONDS 2 . PRESSURIZER LEVEL
-    3 . PRESSURIZER VAPOR  TEMPERATURE RUN DATE      : 11/21/89
-SOLID LINES indicate SIMULATOR DATA                                                                  SIMULATOR FILE: PTP-SS.C . SIM
---DASHED LINES indicate REFERENCE DATA                                                                REFERENCE FILE: N/A
 
SALEM SIMULATOR PERFORMANCE TEST SS4 MWT STEPS MWE      PCT                                                          SIMULATOR STABILITY 3500 230. 1200 120. 1--~~~~~~~              -- --~~--~  -=--::;;;,_-_-_
                                                                          -.-
                                                                            ~~~~~~~~~~~~~~~~~~~:..-~~~~-                      -~--~--~- -~...;..._~~~~
                                                                                                                          -~ ----L----<
I 3150 207. 1080 108 .                                T I
                                                          -                l!
                                                                                            - - '"1" i
                                                                                                      -  -;      t-i I            I I
1 2800 184. 960. 96.                                                      -- r--. -
I I                                              I I
i i
2.450 161. 840. 84 .
I I
                                                                                                          *+      +
t I
2100 138. 720. 72 .                                +                      t                            +        .'                    t I
I I
                                                                                                    !
I 1750 115. 600. 60 .                                                                  +          l.              ...                    +
II                I I                                                            i I                                                            I
                                  -- j                + -
t I
                                                                                                        -  -+
i
                                        !
r I
                                - - -
I 1 - - - --  - -i
_J            - __._ -          - -- __ 1 I
I ANS 3.5 .
                            ---- --- t '
I
                                                                                                              -- ~ P'ERFQ RMANGE 1
                                                                              ;
I l                                      e-I DATA t                ~1 I
            . 000 . OO LH-~~~~-i--~~~--1'~~~~-i-~~~~-t--~~~---~~~~--~~~~1--~~~-t-~~~~-i--~~~-+
2    1              360.          720.                    1080      1440      1800      2160  2520      2880          3240        3600 1 POWER RANGE N-41                                                                  SECONDS 2 . GROSS ELECTRICAL OUTPUT 3 . CONTROL BANK D POSITION 4 . MEGAWATTS THERMAL CORE                                                                                          RUN DATE        : U/21/89
~SOLID      LINES indicate SIMULATOR DATA                                                                                SIMULATOR FILE: PTP-SS.4 .SIM
---DASHED LINES indicate REFERENCE DATA                                                                                  REFERENCE FILE: N/A
 
SALEM SIMULATOR PERFORMANCE TEST SS4 DEG FDEG F                                            SIMULATOR STABILITY 700. 700 .                  --....,...- - -
r                                              -r          ~-r-630. 630 .          t I
L I
j            I
                                                                                                  +
I I
I j.
I t
l  2 560. 560 .                                                            - j-490. 490 .    - i - - ----f*
I I
I
                                                                    --- -t -    -+---+--- ___
I            l J - - -- ~ --
1
                                                                          -~
1                                ii 420. 420 .
                          ---- -r-----i I            ;
I --
I JI
                                                                                                  '          I i
350. 350 .  --- __l _ -- - ~-                                      ---I*
I
                                                                                          -  --i--*- --t- ----+- -
o I
I                                                                i          !
I 280. 280 .
210. 210 .  ---  -~
I
                              --f-I I
                                          +  '
I t* -
                                                          ... --
                                                                        - L I
                                                                                -
t
                                                                                    .
                                                                                        -.      -t- ----- t---- --~I I
                                                                                                  !
I
                                                                                                -1I -- -
                                                                                                            !
                                                                                                            '
I
:
1- -
I I
                                                                                                                            -- -
                                                                                                                          +----- -
t--
l j_ _ _ _ _,
                                                                                                                                                  !
                                        -~~
I I
I                                                                I                  ANS 3.5 I I
                                                                                            ---I -- -
I 140. 140 .  -- -r --!
                                                          ~-      ----    T I
                                                                                    -t I
II PER FORMAN~ -
                                                                                                  '
70 .0 70 .
t I
1                      i      -  .          DATA --!--
                                                                                                            *~---------------:'----*
1 I
                                !
2      1        360.        720 .        1080            1440    1800          2160      2520        2880      3240        3600 1 22 RC LOOP Tc                                                          SECONDS 2 . 22 RC LOOP Th XE 0 RUN DATE        11/21/89
~SOLID    LINES indicate SIMULATOR DATA                                                                            SIMULATOR FILE: PTP-~ . SIM
---DASHED LINES indicate REFERENCE DATA                                                                              REFERENCE FILE: N/A
 
SALEM SIMULATOR PERFORMANCE TEST SS4 DEG FDEG F                                                            SIMULATOR STABILITY 700 . 700 .
1 630. 630.
I 1          - t I
                                                                    -  t                            +
                                                                                                                        -~
I
                                                                                                                                -t                          2 I                                                            I 560 . 560 .                        --i                                              -  +
t                                          1 I        I 490 . 490 .    -  ~-  -+--                    --  --*      t-I
                                                                            ---        f -
I
                                                                                              -      f*
                                                                                                                      --t - -- - i I        I
                                                                                                                                        - --t-I 420 . 420 .
350 . 350.
                                    +
i t
f I
l! -            +        -  t - ---
                                                                                                                      -1        T r .-.--r--.- r -1
                    ,.
280 . 280.
I I
I
                                                  -t- - - -
                                                                          !
__,
t I
I r-..: .r - --1            --r 210 . 210 .            - - -  -    i  - -  -  -*
I II
_,
I
                                                                                                                        ---------~-------:---~1----l
                                                                                                                        '    ANS 3.5 :
                                                                                                      !                                                  I 140 . 140 .              r- - - - --
                                    '              t --
I
                                                            -  -                ----  t
                                                                                                            --~. -- -- PERFdRMANtif                    --j I
70 . 0 70 .
I I-                                                                            QA.TA (
I
                            -  -  -+
I I
I 1
            .000  . 001 CH-~~~-+~~~---!~~~~+-~~~4-~~~-4-~~~-'-~~~--+~~~--<I--~~~~~~--'
2        1          360.          720.                  1080          1440          1800      2160    2520      2880      3240        3600 1 . 23 RC LOOP Tc                                                                      SECONDS 2 . 23 RC LOOP Th RUN DATE      : U/21/89
~SOLID    LINES indicate SIMULATOR DATA                                                                                      SIMULATOR FILE: PTP-SS4 .SIM
---DASHED LINES indicate REFERENCE DATA                                                                                      REFERENCE FILE: N/ A
 
SALEM SIMULATOR PERFORMANCE TEST SS4 DEG FDEG F 700. 700 --      ----;        -
1I T
I I
SIMULATOR STABILITY 1
                                                                                                                                            ,---1
                            - _ l_ __                  ~-        --*j
                                                                      !                                I I
_ _ _J
                                                                                                                                +
630. 630 . -~                                    - -            - - -t                  ~
i r
2 560 . 560 .-t-            -~
                                        '
i
                                          --- - - - - j - - -
I
                                                                  -  l -
:
                                                                          -  --** -  t -    -Ji    - t    ..
I I -
I 1
I              :
I ll                        I
                              -- ---- - --* -                                  --r-    - - j_                ,_I t-    - -- -
1 490 . 490 _.__                              ~                                          - --1  -
1 i
420. 420 .* ..
350. 350 .....
_ -_ L.~ *t* --t                                      i
                                                                                    +--
i
                                                                                                  -I I
I i          t 1*
I i
I I
                                                                                                                        - -*
                                                                                                                            -1  i
                                                                                                                                -t ------ iI r
I
                                                                                                                                                          -
II              i                            f II I
I    I                          I I
I
                                                                                                                                              ~-  *-- J I
                                                  -~
I
                                                                                                      !                      -  l__
                                                                      **            1          i      I 280 . 280 * "  - - -- - : -      --          - ..
II              r I
210. 210 .*'"  --    -    -1*
I
                                        !
                                                    *!              i I
I              t I
140. 140 ...    -                      - I-i
                                                                    -i .              I f-              iI I
I                                I 70.0  10 . 0- ~  -
I
                                  - . +--
I                                              --
r              I
            .000  . 001~
o+---~.-----ll-----+----+----~.1-----+----+-----+-----+-----I 2        1              360.          720 .          1080          1440      1800 2160          2520          2880      3240          3600
-    1 24 RC LOOP Tc                                                                      SECONDS
-    2 . 24 RC LOOP Th RUN DATE      : U/21/89
-SOLID LINES indicate SIMULATOR DATA                                                                                        SIMULATOR FILE: PTP-SS.t . SIM
---DASHED LINES indicate REFERENCE DATA                                                                                      REFERENCE FILE: N/A
 
XE 4                                SALEM SIMULATOR PERFORMANCE TEST SS4 PPM LB/HRDEG F                                                  SIMULATOR STABILITY 600. 5.00 5.0      --- - I          -  - -r --- -- - r                                          r          r - - -r        - - -,.-
I 3
I                                        II          I I
                                                                        ----r  I I
540. 4.50 4.0      -----+-                -+--    - - 'I I
                                                                                    -- - - i*- -- - -  +. ------ --i--
I          I
                                                  - r----                                                              I 1
                                                    !                                                      i
                                          !                                                                I          !
480. 4 . 00 3.0    -
                                          !
                                - - - - --i.
                                                                ---t-
                                                                                !
                                                                          - -- t- -- -  - - -~.
                                                                                                    -----1 -- -        r ----1                              2
                                                                                                                                                  -~
i 420. 3 .50 2.0
_J___ _      1-            +
I                          I r
                                                                                                                        !
t-I
                                                                                                                              ~j_
T I
l          I I                          I                                                                          I I
I I
                                                                                                  --- -t  1
                                                                                                                  -*-1 t_J 360. 3 . 00 1.0    --  -- --    "
                                          '
                                            -  --~- -  --- ..    -+--        -i----
I
                                                                                      -  - -+
I                                                                            I I                          I                          I          I        I 300. 2 .50 .00                  t I
I          l            +
t            t            i!          ~
I
                                                                                                                              --l I          I 1
240. 2 . 00-1.0                t                                                                                          -- --- -
I II          I I
180. 1.50-2.0                  lI                                                                r I
I lI        I*                ~-~
                            -----r --- - - --r                                                                                                JI l
120. 1.00-3.0 I                                                            -
It I            ANS ~-.5 I
I I
                                                                                              !
P_ERFORMANCE _j I
I                          '
i            i 60.0  .500-4.0 t
i II
                                                                                                        -l--
I I
I i OAT I
I
      .000  . 000-5.0n - t - - - -- -- - -- -- - -- - - - -- - - -- - - -- - - -- - - -- - - -- - - ----1 3        2    1              360.        720 .        1080          1440          1800        2160        2520      2880        3240        3600 1 . T AVE - T REF DEVIATION                                                    SECONDS 2 . 21 STM GEN BLOWDOWN FLOW 3 . RCS BORON CONC RUN DATE        : 11/21/89
-SOLID LINES indicate SIMULATOR DATA                                                                                        SIMULATOR FILE: PTP-554 .SIM
-- - DASHED LINES indicate REFERENCE DATA                                                                                    REFERENCE FILE: N/ A}}

Latest revision as of 03:27, 6 January 2025

Simulator NRC Certification, Vols I-III
ML18094B224
Person / Time
Site: Salem  
Issue date: 12/28/1989
From:
Public Service Enterprise Group
To:
Shared Package
ML18094B223 List:
References
NUDOCS 9001080110
Download: ML18094B224 (437)