ML18100A433: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18100A433
| number = ML18100A433
| issue date = 06/23/1993
| issue date = 06/23/1993
| title = Artificial Island Emergency Plan,Annual Graded Exercise, S93-03.
| title = Artificial Island Emergency Plan,Annual Graded Exercise, S93-03
| author name =  
| author name =  
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:EMERGENCY PLAN ANNUAL GRADED EXERCISE S93-03 9307010018 930623 0                  PDR ADOCK 05000272 F              PDR                  o~
{{#Wiki_filter:}}
PSEG The Eiiergy People JUNE 23, 1993 #\
 
*-.                    SCENARIO MATERIAL CONTROL FORM ARTIFICIAL ISLAND Your signature below acknowledges the following:
                                                        ,EMERG~NCY
                                                                  ..tF. ;*\*. .
PREPAREDNESS
                                                                        .~ *. :,  '*        j.                  **    .  .
A. Receipt of the below listed scenario materials of. the ARTIFICIAL ISLAND EMERGENCY "P.LAN *ANNUAL. EXERCISE: 1993
                            '. :.:~: <'" '\;~;"                                      ''                  * "  "      '' '      .. ;:~:: ..~:~::, i: *.,: "'~ -~ ~; ;;,~  t'.:' '
CONTROL #
B. I understand the aboye scenario material is CONFID~NTI_AL and '*'sha.ll::inot :be'.,A:r:an,~f'tli tted or *discussed with any individual wh"Q.ds *:no;t *:ide-nt.i:fied _,q.~ either a *
                                          .                                                                  *  .......... "'--**                    '  ........ ~)'('<'.",,...~ ...
m~mber  _Qf the *scenario dev..elopment team or::"~r:*~~*~~-*: '"
def? ignateCi referee or".--e-va*J,;:ua t:qr. ( $.e~ .apprc:Hra-et.r._ 1:+/--st in enclosedf t.                                            ..;:::~n;;L                      r:3~~: ;::*}~; . ~'-* ~<<*,.j .'..,.. ;;;i'~ ::-1.
!.      c.
D.
I shall keep this scehario material LOCKED UP when not under my direct ...ebntrclr~;'..
                                    ..;..
                                .. ~...-A-'
I shall IMMEDIATELY REPORT any loss or suspected compromise of th~lC.O.'nl:ent:S of:o-this .mat,erial to the Head
                                                                                  ~-:::c.                            \"',;.::;.S;,_                                    *. .
                                                                                                                                                                      ~  .~
Referee or the :Eit"M"artagei:" 1Lstect pe.;:i:fl1f.
Craig Banner (Head Referee)                                                                        609-339-1157
                                                                ;.~: ..
Tom DiGuiseppi (EP Manager)                                                                          609-339-1517 Your name.(Print):
                                                                                                          "(  ~                ,
Signature (Date):      _I
                                                      ..... -*...... j.
                                                                          ./ . 93 cc: material recipient file - scenario control 1*993
                                                      . ~ ..*.
 
ARTIFICIAL ISLAND ANNUAL EXERCISE TABLE OF CONTENTS
  .:;:,  Section        Title
: 1. 0    Exercise Schedule                            1. 0. 0 2.0    Exercise Objectives (Non-confidential)        2.0.0 3.0    Guidelines and Scope - Index                  3.0.0 3.1  Exercise Guidelines 3.2  Participant Instructions 3.3  Participating Locations 3.4  Participant Evaluation Forms 3.5  Participant Attendance Forms 4.0      Referee/Observer Information - Index          4.0.0 4.1  Referee and Player Assignments 4.2  Referee/Observer Instructions 4.3  Observation Sheets 4.4  Phone Lists 5.0      Scenario Overview  ~ Index                    5. 0 *.0
, .*                5.1 5.2 5.3 5.4 5.5 5.6 Scenario Synopsis/Narrative Scenario Timeline Major Observable Onsite Events Onsite Actual vs. Simulated Events Radiological Assumptions Exercise Objectives (Confidential) 6.0      Exercise Message Forms                        6.0.0 7.0      Supplemental Scenarios                        7.0.0 8.0      Operational Data Spreadsheet                  8.0.0 9.0      Onsite Radiological & Chemistry Data - Index  9.0.0 9.1  Sample Analysis Data 9.2  RMS Data and Plant Vent Flows 9.3  Inplant Survey Maps and Data 9.4  Onsite Survey Map and Plume Data 10.0    Offsite Radiological Data - Index            10.0.0 10.1  Offsite Plume Maps 10.2  Plume Centerline Data 10.3  Specific Locations 10.4  Met Forecast Data
-*(*    11. 0    Samples of Data Presentation TOC 11.0.0
 
SECTION 1.0 ART:IF:IC:IAL :ISLAND ANNUAL EXERCISE 1993 SCHEDULE
* Monday - June 21 A.
B.
osc Referees/Observers initial briefing, book distribution and scenario walk through.
Time:      0900-1500 Location: Salem Lobby Conference Room PSE&G RefereesfObservers initial briefing &
book distribution. (other than OSC Referees)
* Time:      1400-1600 Location: Processing Center Tuesday - June 22 A. NRC Exercise Team Access Training & Tour Time:      1300-1500 Location: Processing Center/EP Conferenc.e Room B. NRC Exercise Briefing (Banner, Pierson, Jones}
Time:      1500-1600 Location: EP Conference Room Wednesday - June 23 A~    PSE&G Referees/Observers Times:          Locations:
0700        Simulator - Simulator Referees Only 0715        Salem Lobby Conf Rm - All Onsite Referees 0830        EOF - All Offsite Referees B*    S~ift Player's Initial Conditions Briefing Time:      0730-0745 Location: Salem Lobby Conference Room
: c. Simulator Players Initial Conditions Briefing Time:      0700 - 0800 Location: Salem simulator D. Artificial :Island Annual Exercise Time:      0800-1600 Location: Salem Station, Simulator, EOF, ENC E. Exercise Participant's Critique by Players, Referees, and Observers at exercise t~rmination (time approximate}.
Time:      1600-1630
* Location: Various ERFs Thursday - June 24 A. P~E&G Lead Referee's Critique.
Time:      0900-1200 Location: EP Conference.Room B. PS~&q  Referee, Management and Player's c:i;itique.
Time:      1400-1500 Location: Processing Center
: c. NRC Critique. (NRC, Lead Refs., EP Staff, Salem Management}
Time:,      1500-16QO (following PSE&G Critique)
Location: Processing Center
: 1. o. 0                  Rev.2
 
SECTION  2.0 ARTIFICIAL ISLAND ANNUAL EXERCISE NON-CONFIDENTIAL PLAYER OBJECTIVES OBJECTIVES:
: 1. Demonstrate command, control, and coordination within the Emergency Response Facilities (ERFs).
: 2. Demonstrate the ability to effectively communicate within and between ERFs.
: 3. Demonstrate the ability to properly classify emergency events in accordance with the Event Classification Guide (ECG).
: 4. Demonstrate the ability to develop Protective Action Recommendations (PARs) and notify offsite agencies in a timely manner.
: 5. Demonstrate the ability to properly brief and dispatch teams as required to support plant operations and accident mitigation .
* 6.
7.
Demonstrate the ability to collect chemical and radiological samples and analyze the results.
Demonstrate the ability to analyze radiological data and develop offsite dose projections.
: 8. Demonstrate the ability of engineering support to analyze operational data, assess the status of fission product boundaries, recommend alternative actions to mitigate an accident, and evaluate the performance of safety systems.
: 9. Demonstrate the ability of Emergency News Center (ENC) staff to develop timely and accurate news releases, brief the media, and control rumors.
: 10. Demonstrate the ability of the Emergency Response Organization to perform Recovery Planning. (TSC and EOF only)
: 11. Demonstrate the ability of the Referees to control the scenario, ensure plant and personnel safety, effectively critique drill performance, and document deficiencies for subsequent resolution .
2.0.0
* SECTION 3.0 ART:IF:IC:IAL :ISLAND ANNUAL EXERCISE 1993 GU:IDEL:INES AND SCOPE SECTION #  SECTION NAME                        PAGE #
3.1  EXERCISE GUIDELINES (STANDARD}          3 .1. 0 3.2  PARTICIPANT INSTRUCTIONS (CONDENSED}. 3.2.0 3.3  PARTICIPATING LOCATIONS                3.3.0 3.4  PLAYER PARTICIPANT'S OBSERVATIONS      3.4.0
                                  -:~
3.5  PLAYER ATTENDANCE SIGN-IN SHEETS        3.5.0
* 3.0.0
 
SECTION 3.1 ARTIFICIAL ISLAND ANNUAL EXERCISE EXERCISE GUIDELINES I. Purpose This document provides guidance for conducting the Artificial Island Annual Exercise. It provides methods for demonstrating emergency response capability and conducting the exercise.
II. Concept of Operations and Control of the Exercise Public Service Electric and Gas Company (PSE&G) will supply official exercise referees and observers for each location where an emergency response may be demonstrated. Prior to the exercise, the referees and observers will receive an extensive exercise briefing and be provided with the appropriate locations, maps, time lines, and observation checklist(s) corresponding to their assignments.
Referees will hand out messages and/or cue cards and will make judgment decisions as required. If unplanned situations arise, they will contact the lead referee in their assigned Emergency Response Facility (ERF) or advice and resolution of the problem.
Lead referees are designated for the Simulator, TSC, osc, EOF,
* ENC and Control Point.
The Head Referee, stationed as the lead referee in the TSC, will be in overall command of conducting the exercise. All requests for modification or holding periods must be cleared through the Head Referee.
As initiating events are provided, the Plant Staff will determine the nature of the emergency and implement appropriate emergency plan procedures. This will include a determination of the emergency classification in accordance with the Event Classification Guide. Players should notify the Lead Referee of the appropriate ERF prior to formal escalation or de-escalation of the emergency classification. If the proposed classification change is within 15 minutes of the scenario timeline, the referee will allow play to proceed. Required notification for changes in even_t classification shall be completed in accordance with the Event Classification Guide *
* 3.1.0
 
The hypothesized emergency will continue to develop based on data and information provided to emergency response personnel.
* As the situation develops, information will be forwarded to appropriate personnel for the determination of actions to be taken in response to the hypothesized emergency. If a conflict exists between the scenario (Hypothesized) data and the actual data, (simulator driven) the scenario data shall be utilized.
Certain inconsistencies (such as radiation level, equipment availability, etc.) may be intentional and required to provide an exercise basis which will test emergency response to the maximum extent feasible in the limited time frame of the exercise. The lead referees will have the authority to resolve or explain any inconsistencies or problem which may occur during the exercise.
III. General Guidance for the Conduct of the Exercise Participants shall avoid taking any actions during the exercise which would actually reduce plant or public safety. The potential for creating a real radiological emergency or endangering the public shall be.specifically avoided.
1.0  simulating Emergency Actions Since the exercise is intended to provide demonstration of actual abilities as closely as is reasonably possible,
* the participants should act as they would during a real emergency *. All actual actions shall be taken where possible. Simulation will be utilized only when it is not feasible to perform the actual action.*
When orders are qiven to others, (outside of the simulator), during drills and exercises, the order should contain the word "Simulate" as the first word, if that is what is.meant. For example, the order to put out fire that is beinq hypothesized would state "simulated discharqinq the fire extinquisher." Where such actions are being taken, it is suqqested that participants inform any observers in the area of what action would be actually taken had the emergency been real.
    *Refer to Section 5.4, "Onsite Actual vs. simulated Events."
3.1.1
* Actual evacuation of a segment of the general public for exercise purposes is undesirable due to the unnecessary public hazard created and great public inconvenience of such action. No actual evacuations of the public are planned.
2.0 Avoiding Violation of Laws Intentional violation of laws is not justifiable during any exercise. To implement this guideline, the following actions must be taken prior to conduct of all exercises:
: a. All observers and potential drill participants must be specifically informed of the need to avoid intentional violation of all Federal, State, and local laws, regulations, ordinances, statutes, and other legal restrictions. The orders of all police, sheriffs, other authorities should be followed as would normally be the case.
: b. Drill participants shall not direct illegal actions be taken by other drill participants or members of the general public.
: c. Drill participants shall not intentionally take illegal actions when being called out to participate in an exercise. Specifically, local traffic laws such as speed laws shall be observed.
3.0 Avoiding Personal and Property Endangerment Participants and observers shall be instructed to av9id endangering property (public or private), other personnel responding to the exercise, members of the general public, animals, and the environment.
4.0 Action to Minimize Public Inconvenience It is not the intent, nor is it desirable or feasible to effectively train or test the public response during the conduct of radiological emergency exercises. Public inconvenience is to be minimized *
* 3.1.2
 
The actions of Federal, State, County and municipal agencies, and nuclear power plant operators receive continuous public notice and scrutiny; therefore, the.
conduct of an exercise could arouse public concern that an actual emergency is occurring. In order to minimize public inconvenience and concern, the following actions are being included in the exercise plan:
: a. A f~w days prior to the exercise, the public within the affected area will be informed of the impending conduct of a radiological emergency: exercise. Press releases from Public Service Electric & Gas (PSE&G) will be used to accomplish this. Prior to the exercise the public shall be informed of the following as a minimum:
: 1. The purpose of tlre exercise and that it is a routine function not intended to inconvenience the public unnecessarily.
: 2. The exercise requires no public action or involvement.
: 3. The exercise will be conducted at a pre-selected time during a specifically stated time b.
4.
period.
The siren system will not be activated.
Emergency Response Personnel should make every effort to prevent the public from being misinformed about the nature of the exercise. Therefore, it is important to inform members of the public that an exercise is in progress and that their involvement is not required, whenever direct public contact occurs in the field. In addition, it is important to preface, interject, and conclude conversations that can be.overheard by the public with the words, "This is a drill, repeat this is a drill." Conversations that can be monitored by the public include those on telephones, radios, loudspeakers, telegraphs, etc.
3.1.3
* 5.0  Maintaining Emergency Readiness During the performance of an exercise the ability to recognize a real emergency, terminate the exercise, and respond to the new situation must be maintained.
Therefore, the exercise scenario and actions of participants shall not include any actions which affect or degrade the condition of systems, equipment or supplies, or affect the detection, assessment, or response capability to radiological or other emergencies.
The exercise will be terminated should a situation develop at the station which could adversely affect the licensee's ability to protect public health and safety.
:".~
All messages about real events shall be clearly identified as such. For example precede a real message with "This is NOT, repeat NOT a drill".
IV. Emergency Response Implementation and Operations 1.0  Initial Notification Initial notification will be made in accordance with
* 2.0 the Event Classification Guide (ECG)
* Plant Operations It should be emphasized that the exercise will in no way interrupt normal plant operations, production,.and safety. The responses of Operations Support personnel and plant operators will be simulated when taking action to combat the emergency. To avoid distracting the actual control room staff, the Simulator will be utililized for all drill activities which would involve control room personnel with the exception of PA (Page Announcement) and enabling of PASS sampling.
3.0  Environmental Monitoring Teams.
The Nuclear Generating Station will dispatch field monitoring teams. The referees will provide hypothesized field data which will be used to determine radiation readings at preselected locations~ However, these teams will be equipped with the necessary equipment to enable them to determine actual area gamma dose rates and airborne radioiodine concentrations. The monitoring teams will not be suited up in anticontamination clothing, but will have such equipment at their disposal *
* 3.1.4
 
4.0 5.0 Public Notification Actual emergency message transmissions via the Emergency Broadcast System will not occur.
Public Information The Emergency News Center (ENC) will be activated for the Artificial Island Exercise.
6.0  Communications Communications between the exercise participants will occur in accordance with the appropriate Emergency Plan Implementing Procedures. Should any primary communication path become inoperative or prove inadequate, backup means of communication will be utilized as appropriate.~~
V. Closeout of the Exercise The exercise will be terminated by the joint concurrence of the .PSE&G Head Referee and the Lead NRC Inspector after the major objectives have been demonstrated.
3.1.5
 
ARTIFICIAL ISLAND EMERGENCY PLAN A!DWAL EXERCISE PLAYERS INSTRUCTIONS (CONDENSED)
: 1. Know the drill organization.
Players      shall aggressively work to        mitigate  the consequences of the simulated emergency.
Referees      shall control the drill events to        ensure objectives are met, including safe performance.
: 2. You may ask for information, initial conditions, symptoms or indications.of simulated problems, etc.
: 3. You may ask for help from referees during training drills, but you should first ask another player if ava*ilable.
: 4. Wear your player identification.
: 5. Drill messages, written or verbal, are issued by the referees as needed to keep the *cft'ill scenario on track~
: 6. You must comply with all reasonable directions of the referees for your safety and that of others.
: 7. If you disagree with the referee's direction, you may consult with the lead referee in your facility for a ruling.
: 8. Don't be overly concerned with scenario details that
* 9.
appear unrealistic. Play the game
* Do not "simulate" your actions unless directed by the referee or if actually performing that action will potentially affect plant status or personnel safety. When in doubt, ask the referee to repeat or reconsider a direction given to you.
: 10. Speak up when communicating with other players and occasionally think out loud so the referees can follow your actions and thoughts.
: 11. Play as if the simulated radiation levels of the drill scenario were actually present. Take every opportunity to demonstrate your knowl.edge of ALARA and radiation protection principles.
: 12. Do not allow your performance to be distracted by non-drill participants.
: 13. Complete all of the documentation as thoroughly as possible. (this includes status boards, communication farms, tagging requests, EPIPs, log books, etc.)
* 3.2.0
 
ARTIFICIAL ISLAND EMERGENCY PLAN ANNUAL EXERCISE PLAYERS INSTRUCTIONS (CONTINUED)
: 14. Keep a list of items that you feel should be done to improve your emergency preparedness, drill effectiveness, or any problems encountered that may require corrective actions.
Your solutions are welcomed as well, but at the least we need to identify the problems.
: 15. A critique for all participants in each facility will follow immediately after the drill ends and should last about 3 O - 60 minutes allowing everyone the bpportuni ty for feedback, both positive and areas of concern.
: 16. Remembei; to say, "This is a drill", in all. verbal communications and write "Drill" on all documents used.
: 17. The Control Room staff will participate from the Simulator.
An Artificial Island phone number has been set up (X3339) along with a radio base station in the Simulator to facilitate communications.      . ...
The PA System is not operable in or from the Simulator.
NETS phone numbers for the Control Room have been programmed to transfer automatically to the Simulator.
: 18. Scenario data is generated and provided by. different means during the course of the drill. Some inconsistencies are unavoidable. If in doubt, ask the lead referee in your facility which data to use and which to ignore.
For the most part, operational parameters will be generated live off the Simulator while radiological data is "canned" or prepared ahead of time in order to facilitate control and distribution throughout the ten mile radius surrounding Artificial Island and onsite.
s:_,
SOME FINAL REMINDERS FOR THE SAKE OF SAFETY
: 19. Entering.the RCA for drill related activities requires you to abide by all normal radiation protection rules. Absolutely no one, including Referees or Observers, is permitted to disregard normal station rules of any kind.
CAUTION:  DO NOT ENTER REAL HIGH RADIATION AREAS OR CROSS ANY REAL STEP OFF PADS FOR DRILL ACTIVITY.
: 20. Follow all industrial safety rules including use of hard hats, sa~ety glasses, hearing protection, etc.
: 21. Do not open any electrical panels, breakers, or cabinets or otherwise physically come in contact with plant equipmen~    .*
that may affect your safety or the plant status.
3.2.1
 
ARTIFICIAL ISLAND EMERGENCY PLAN ANNUAL EXERCISE PLAYERS INSTRUCTIONS (CONTINUED)
: 22. Immediately contact the duty SNSS if any real plant problems are discovered. The drill may be suspended at any time at the direction of the duty SNSS or Head Referee if a real operational problem develops. Players will be notified to back away until such time as the duty SNSS determines that the drill may continue.
: 23. If during the course of the drill, any problems with equipment or plant systems you are working with or around are detected,  take a moment to properly document those discrepancies in accordance with plant procedures (EMIS tagging) and ensure that the duty Operations Staff is notified.
* 3.2.2
 
CONTROL ROOM STAFF - SALEM SIMULATOR 1.
SPECIAL INSTRUCTIONS NETS phones are programed to bypass the Salem Unit 2 Control Room. Be sure to say, "This is a drill", when communicating over the phones, radio, or PA system.
Otherwise, regard yourself to be in your Control Room.
: 2. Radio in the Simulator is live and may used as you wouid your Control Room Radio.
: 3. DID Extension 3339 on the Communications Console is a live Artificial Island Extension.
: 4. Plant PA announcements that you must make for drill purposes will be relayed by a controller in the Control Room .onsite.
: 5. You are expected to respond to~all Simulated events as you would in a real emergency within the Simulator.
a)  Follow your EOPs and other approved procedures.
b)  Communicate as you do during your Simulator training, but try to OVERCOMMUNICATE to the extent that the Simulator Referees are always aware of the actions you intend to take in time for them to intervene as needed to support the scenario.
: 6. Communicators, CMl and CM2, are expected to obtain data from the Simulator boards unless directed otherwise.
(some data must be mocked up; radiological readings, Met data, H2/02 concentrations, etc.)
: 7. When directing the osc or other players outside the Control Room to take actions for drill purposes, be sure to preface your directions by saying, "Simulate", as in "Simulate racking out the Breaker."
Also remind the player to ensure they have a referee with them in the field. It may be necessary for the player to stop by the osc area and ask for a referee if the osc has not yet been activated.
: 8. The Shift Rad Pro Tech will participate in the Simulator. RMS data consistent with the scenario will be supplied from a book of data sheets near the RMS Computer in a format that emulates a printout sheet.
Disregard any radiological data off the simulator itself with the exception of alarms.
The RMS Trouble overhead Annunciator will be used as needed by the simulator referee to key you to looking for changes in the RMS data.
3.2.3
: 9. MET data is provided in book form emulating the computer screen located in the back of Unit 1 Control Room .
SIMULATOR LIMITATIONS/ DRILL SCENARIO CONSTRAINTS
: 1. Plant components (pumps, valves, pipes, etc.) that will fail for scenario purposes will be programed or controlled to fail by the Simulator referee at the appropriate times.
As long as the Simulator is live you need to respond in accordance with your training and procedures to the alarms and indications that you see.
Occasionally a referee may interject an event using a message form if simulation is not possible.
: 2. If the Simulator crashes or your actions are causing plant parameters to deviate significantly from the expected (planned) data for any reason the Simulator referee will be directed to FREEZE the program. Play will then continue by the most appropriate method to get us back on the timeline.
a)    Back track may be used to reset conditions.
* b)    Time out may be called with the simulator initialized at a later time period in the scenario with an appropriate "interim briefing" provided by the referees as to what was postulated to have occurred up to that point.
c)    The simulator may be turned off and left off (dark board) with play continuing using paper message forms and prepared operational data as we have done in past drills from the Control Room.
NOTE:    FREEZE periods for the simulator do not stop the rest of the drill from proceeding. It is an internal control for our use in keeping the operational data consistent with the prepared radiological data. You shall continue to play and verbally describe to the referees what actions you would be taking.
d)    When in FREEZE, continue to follow your EOPS, communicate with other facilities as if nothing has happened unless a large step change in the operational data needs to be explained. Keep the drill going unless the simulator lead referee specifically allows you to relax or take a break .
: 3. Some individual parameters may be mocked up if they are required to respond (for scenario control) in a manner that is inconsistent with the simulator modeling.
For example;
  - most if not all radiological data
  - meteorological data
  - Drywell Hydrogen/Oxygen Concentrations
  - some indications of containment failure
  -  some types of component failures (specific OSC objectives may dictate)
  - RCS break locations and/or sizes
  - peak values of critical parameters that assume worst case conditions and therefore exceed design bases (scenario license invoked)                *
: 4. If you suspect a problem with a Simulator indication you may call an I&C Technician to* come to the Control Room from the osc.
For scenario control, tell the Referee of your intended request and a Simulator staff personnel will role play the I&C Tech. to troubleshoot the problem.
: 5. Other limitations:
  -  oscc interface must be strictly by phone
  -  EC turnover by phone only
  -  SRPT interface from Control Room to OSC, phone only
  -  cannot directly contact EOs except by phone or radio since PA is not connected to the Island.
  - RMS computer Data display does not include fully dynamic data like the operational data from the Simulator. Some data interpolation is necessary between prepared time intervals.
OPPORTUNITIES
: 1. Ability to conduct Emergency Plan drills from outside of the real control room. (plant safety)
: 2. Better realism for Control Room Staff during periods of live simulator action.
: 3. Improved realism, too, for the TSC and EOF staffs when the SPDS link from the Simulator is functional since they can see the operational data changing instantaneously.
* 3.2.S
 
SALEM SHIFT PERSONNEL DRILL PLAYERS
* SPECIAL INSTRUCTIONS In addition to the normal player instructions, please keep the following in mind.
: 1. The control Room staff will be participating in today's exercise from the Salem simulator at the NTC.
If you need to speak with the SNSS or any of his Control Room Staff you can use the NETS phones to call the Unit 2 control Room and the calls will be forwarded automatically to the simulator .Q.I'..._yOU may use the DID phones to call 3339. (no prefix is needed)
: 2. If you need to go to the Control Room for any reason, a Referee stationed there will assist you as needed by either role playing the SNSS or directing you to call him.
EDO should call the Simulator to speak with the SNSS for EC turnover briefing.
osc Coordinator should call SNSS at Simulator to ensure team priorities are correct *
* Scenario problems will be addressed by the Head Referee located in the TSC.
Real emerqency or off normal situations, if they arise, should not be reported via NETS to the control Room. Use the plant PA system or DID phones. Be sure to emphasize, "This is not a drill !"
: 3. SPDS in the TSC and EOF should be live (real time) off the Simulator model during all or most of the drill.
DO NOT USE RADIOLOGICAL DATA DISPLAYED ON SPDS.
The Simulator driven Rad Data is not consistent with our drill scenario and shall not be used.
: 4. The Simulator operational data may differ from that expected or predicted when the radiological data was generated. Do not let any potential disconnects in the data throw you or let it drag down your performance.
: 5. simulation may be temporarily frozen at the simulator from time to time in an effort to control the data, but keep in mind that the drill continues even during those periods unless the Head.Referee specifically stops the drill for some other reason *
* 3.2.6
: 6. When the drill begins (very shortly), you are on shift, at work in your normal work locat_ions and ready, as always, to respond. That is you should have your normal tools and gear with you as appropriate.
Exception: NEO's should begin the drill in the osc area unless directed otherwise by a Referee for prestaging.
: 7. If during the course of the drill, any problems with equipment or plant systems you are working with or around are detected, take a moment to properly document those discrepancies in accordance with plant procedures (EMIS tagging) and ensure that the duty Operations Staff is notified.
                                . p 3.2.7
 
SECTION 3.3 ARTIFICIAL ISLAND ANNUAL EXERCISE
* A.
B.
PARTICIPATING LOCATIONS SITE MAP OF SALEM GENERATING STATION SALEM TRAINING SIMULATOR (NTC)
PAGE #
3.3.1 3.3.2
: c. OPERATIONS SUPPORT CENTER (OSC)            3. 3. 3 D. TECHNICAL SUPPORT CENTER (TSC)              3.3.4 E. MAP LOCATIONS OF NUCLEAR TRAINING CENTER &  3.3.5 EMERGENCY NEWS CENTER F. EMERGENCY OPERATIONS FACILITY (EOF)        3.3.6 G. EMERGENCY NEWS CENTER (ENC)        -*.~
3.3.7 (SALEM COMMUNITY CENTER) 3.3.0
 
                                                                                                                                                                                                            . .-=====--*
~11111
                                                                                                                                                          ---~---
tCl Hit L.~11.,,,,. .
                                                                                                                                                                                                ,(-  \)
  \
    \\                                                                                                                                                          PARKING AREA          \ \ IAlllf"
        \
          \
            \
              \\
                \\
                    \
                      \
                        \
                          \
                            \
                              \
                                \
                                  \
                                    \\
                                        "\
                                          \\
                                              \\
                                                \
                                                  \
                                                    \
                                                      \\
                                                        \
                                                          \
                                                            \
                                                              \
                                                                \\
                                                                    \
                                                                      \
                                                                        \
                                                                          \\
  *w                                                                        \
                                                                              \
                                                                                \
SALEM
  *                                                                                \,                                                                            S\JITCHYARD
                                                                                      \
                                                                                        ' \
                                                                                            \
                                                                                              \
                                                                                                \
                                                                                                  \
                                                                                                    \
                                                                                                      \
                                                                                                        \
                                                                                                          \
                                                                                                            \                                                                                                          /!
[~/  (
                                                                                                              \
                                                                                                                \
                                                                                                                  \                                                                                                    I
                                                                                                                    \
                                                                                                                      \                                                                                                l
                                                                                                                        \
                                                                                                                          \
                                                                                                                            \
                                                                                                                              \
                                                                                                                                \
                                                                                                                                  \
                                                                                                                                    \
                                                                                                                                      \
                                                                                                                                        \
                                                                                                                                                                          *'IJltl l'OOD
                                                                                                                                          \
                                                                                                                                            ' \
                                                                                                                                                \
                                                                                                                                                  \
                                                                                                                                                    \
Artificial Island AJO Emergency Plan.                                                                                                                                                    DU AV1Wl RIV[ R
                !992 Annual Exercise SITE MAP OF SALEM GENERATING STA'rION
 
SALEM TRAINING SIMULATOR                ,.. *
                                                              .l*eouro., r ... --t--~~-_,,... . . .-..-.-i.
    .          . ,._.,. n
                                                                  .._::~~,.. --
w
*w
    ;;---
l 2
*N
                                                                                                            ---- f)
 
I I
SALEivI GENERATING STATION CONTROL R0011 COMPLEX _.\REA
*I SSS SHIF'i SUPERVISOR o;:-;:-1cE
                                                                                      ~
                                                                                        ,. ESSX I x8320 SSS DID x5544 ESSX I x8670 DID x5533 OFF'ICE                                    4    U/11 SHIF'i SUPV DID x5677
: 5. NAWAS. STATE CALLBACK (609) 339-5677 n
: 6. CMl NETS x5126 CM2 NETS x5 I '2.7 4                          7. TELEFAX NETS x5131 FAX CALLBACK DID x5588
                      'W                                                              8.
9:
U/1 SHIFT SUPV. DID x5511 NRC/ENS HOTLINE 9                SS                    COMM.
AREA          5          AREA ID                      '&
:-----;...._~'                  /)___;"-          f?al '@  w ....''&ID      1 6
I 15 CONSOLE                  -CJ r:n CONSOLE 0
                                              -0
                                                ~
r:a                    0 10 '&      D        E-4 zr:a                    m ,,
12        CJ D        ~
0 11 '&      13        Cl.
Cl.      D            mi    18 r:n      16 r:n z
0 1-1 E-4
                                                ~
r:a UNrT 1 CONTROL ROOM                Cl.              UNIT 2 CONTROL ROOM 0
UNrT I CONTROL ROOM                                                UNrT II CONTROL ROOM
: 10. NETS x5120                                                    15. MEDICAL EMERGENCIES x2633. NETS x5125 ESSX I xa!SB                                                  16. UHF RADIO LOAD DISPATCHER                                                17. NETS x5123
: 11. NETS x5121                          FlLE                            NRC/ENS HOTLINE DID x5111                        CABINETS                          DID x5222 NRC/ENS HOTLINE                                                18. NETS x5124
: 12. EMRAD RADIO                                                          ESSX I x8806
: 13. UHF RADIO                                                            LOAD DISPATCHER
: 14. NETS x5122 MEDICAL EMERGENCIES .x2633 3.3.3 ...
 
SALElvf GEN ER.A TI:>I G STA.TI ON I
OPERATIONS SUPPORT CENTER I
(,~ '-,
SNSS OFTICE                        1.
I j
              ...                                        osc CLERK STATUS I                                                    BOARDS
              ...                              osc COORD,  Cl NETS I                                            x512B NORMAL OPS
                                      .. -. SUPPT. 0      DID x25BB TRAFFIC ID UNIT 1 FLOW                          MAINT.
SUPV.
Sl'TE: PRO.
SUPV.
0 0
NETS x51.30 DID x2589      UNIT 2 CONTROL I                                                      CONTROL ROOM
              ...I                        RAD PRO    0      ID          ROOM SUPV.          NETS x5129 0      RADIO BASE FIRE PR01ECTION EQUIPMENT
: 3. 3. 3.b
 
SALEM GENERATING STATION TECHNICAL SUPPORT CENTER STATUS BOARDS a              a                c::.                c::.
I              jw      1 1w      2    tm:31ID      4 I
I RAD ASSESS/        ~ASSESS.            RAO ASSESS/
PARTITION 25        SALEM                                                                    WEATHER          c:-1 STATION OPERATIONAL          I                                        COMPUTER~
25 STATUS BOARD  ~
                                ~    (::?
WO 9 EDO l~o  ~~ *~
SECURITY o UP TSS                      RAC            FIRE ID        11 EXTINGUISHER    ---;===:;;o:,.,ll:-..,
T C RAMP      IN EDD SEC.
0                              0 GAJ-TRONICS                          TRASH
                                                                              ,,_.,..,,,5~ .---,,5,....-,  ~
                      &#xa9; '&      12
                          ~      13 OPS/ENG.
ASSESS.
                                                                                                              ~
U1 g
AO~~N I! I                                            (.) 1----.
Im I  C7 11                                                        ID26
                      &#xa9;
                                                                                                                ~            AOMIN.
V>            ROOM 0
                                                                                                                ....I 20  21 22            u TSC HVAC SYS'T!M/PANELS Im 0 27        W2a 0
: 1. NETS :510:3. DID x270S                        17. AOMIN - DID x2712. NETS x5118
: 2. NETS x5105, DID x2702                        18. NEIS x5113. DID x2711, ESSX x8861
: 3. NETS x5107                                        NAWAS. DID 12710
                                                                                                                      ~D
: 4. NETS x5104, DID x270:3, DID x2704            19. NEIS x51 12. NRC/ENS. DID x2709
: 5. SPDS TERMINAL.
: 6. NETS x5106
: 7. DID x2706 NE1S x5109 - OPS DATA
: 20. ADUINISTRATIVE SUPPLIES
: 21. AIEPIP/ECC WORK Fil.ES Im  0 31
: 8. NETS x5101. ESSX x7961                        22. ADMIN KITS (SUPPLIES)
: 9. NETS x5100. DID x2700                        23. TRANSMITTING FAX-NETS x5108
: 10. NETS x5102. DID x2701, ESSX x7939            24. RECEIVING FAX-NEIS x5114                                                  NRC 12.
NRC/HPN (609)* 935-6172
: 11. NETS x5117, DID x2707 SECURITY RADIO MONITOR NETS x51 1O. DID x2708 2S. RAD PRO LOCKER
: 25. NEIS xSl 18. DID x2712
: 27. NEIS x511!5
: 28. DID x2713 lm30    I      ROOM
: 13. NETS x5111. ESSX x8821                        29. NRC/HPN (609) 935-6172
: 14. MANUALS                                      JO. NEIS x5116
: 15. ENGINEERING DRAWINGS                          31. NETS x5119
-    16. STATUS BOARDS
* 1 . _ 1_                  _                _                _                  _                    _              __
3.3.4
 
FREAS SALEM I
J
                      ---            -----~)
                                  /\    TRAILER CEM.
_J              I
                                  / i-+---  PARK
~            EVERGREEN        I w
Q:'.
w
          !;Z    AV.
I I
I SALEM (COUNTY SEAT)
:c                    I              I
                                      \
1-
<I:
w                                      \
Li..
 
E1v1ERGENCY OPER ..L\TIONS FACILITY
* R I RAD I.
SUPPORT6IJC
              ~*A1US BOARDS
              \.-/  0 0
                    ~,
0  0
: .;
1-\
                                        "-.j RADIO u;I*I! LJ I
1
                                                                "--o--u-1 PRESS RELEASE BUl..L&#xa3;TIN BOARD LJ lJ LAJ I I a
RAD1os :
0 D
0 STA~
r:l B
0 CJ D
RSM 1                                B US RARY a 12 a
a D
D D
c c
E tn 0
0:::
PIL 0
a          D
                                                                                                                -      F' a 13 a~
  <(                        00                                                                              D 0
CD                                                                                              a          D tn
  ~                          0                                            00                    a          o-I-                                                                        ASM ERM
    <(
1-                                        0 tn                      SSM                                                                        TSU              G a          o 6
o          DO          D H
o DO          D ssu srrG              D                                                            DO          D NRC a_....._.D                                                                oa          D v 1
_101                          00          00        F[MA                                  J
_1                                                                      TECK. SUPPORT
                                                              .SAL.al ok                                              w HOPE CREEK STA1\JS BOARDS                              STATUS BOARDS    x ROOM *A* .COMMUNICATIONS                  ROOM .,.,. CCUUUNICATIONS (CONT.)      ROOM *~ COMMUNICATIONS LOCKER      R                            CABINET 0                              LOCKER A
: 1. NETS      &5005    CID x.3763          SAW.I & HOPE CREEK ECC WORK            12. NETS .S024    DID aJ!iM NETS    &5006                        FILES                                      NETS a502S    ESSX x7728
: 2. NETS      &5001    CID x3992          CABINET P                              LOCKER F NET'S x5002      DID xJHJ            SALEM tk HOPE CREEK AIEPIP WORK        1J. NETS xSD22    DID x37!8 NEIS xSOOJ      ESSX a7455          FILES                                      Nm &5023      CID x3789 NETS :s5004      ESSX a7411                                                      ESSX x7850 ESSX x7468                          ROOU  *s-  CCUUUNICA'llCNS            LQCKER J NRC/HPN (609)      935-75~                                                  14. NETS a5007    DID x3785 LOCKER o                                                                              NEIS x5020    DID x3911
: 3. NETS aSOOO          CID !13981        LOCICER E                                  ESSX x7580 NEIS z5010        ESSX z7877        10. NETS .saaa        ESSX a7511      15. NEIS x5017
: 4. NETS x5011          DID s.1781              MEI'S a5QOI                            NEIS :5018 ESSX a7517                          LOCKER L                                    NEIS x5011
: 5. DID xJ8U                                11. NETS x5015        DID s.1751 LOCKER N                                      MEI'S a!011      DID 113915
: 6. NETS a5012          DID x3762              NETS a5021        ESSX a8519 NEIS a5014        ESSX z751!              ESSX ll!52D      NRC/ENS
: 7. NEIS z5013          ESSX a750!              NRC/HPN - (609) 135-75~
NRC/EHS          ESSX x7519 NAWAS            ~      x5042
: e. TRANSYl1'11NC 'IUECCPIER NEIS x5034
: 9. RECIEVINC lUECCPIER NEIS id035 3.3.6
 
PSE&G                                  EMERGE~CY                                                ~EWS          CENTER
                                                                                  'i
                                                                                                                      '.~EDlt.. iNFO.
                      \  A "' I *
                        .11AI i    *~
                                              ;
I ~i-~.!\J
: o. ' ,- -
L::.                                            _ :.::: =::.OM P~E&G      STAFF I
ii.                        :'                          OPERATIOi~S                                  .;
                                                      .-11                                    ROOM                  WRITE2S RM KITCHEN I
I I
r II i
MEDIA Mm*JITOR ROOM DINING ROOM                                                STAFF I
                                                                                      .                              NRC/FEMA        I I
                                                                                          ~
                                                        \
                                                          "                        I'                                    ROOM
                                                          \~                        i      RESTROOMS.    :
I    ,__                    1
* MEDIA INFO LINE RM:
NETS - N/A (609)273-0062, 0188, 0282.
0386, 0479, 0586 STAFF WRITERS ROOM:                                                                                                NEW JERSEY NETS - 5315,* 5316, 5317,                                        DIRECTOR                                                ROOM 5319, 5326 (609)273-0607, 0695, 0792 0881                                                                                ENC MEDIA MONITOR ROOM:                                                                          CONFERENCE NETS - 5302                    .                                                                ROOM NRC/FEMA ROOM:
NETS - 5310, 5311 , 5312, 5308                                                                                                          DE. RM
( 609 )273-0992. 1049, 1179 NEW JERSEY ROOM:
NETS - 5320, 5321, 5322,                                -                                                I 5304, 5305                                                                                              DE. COUNTY RM (609)273-1263, 1395 DELAWARE ROOM:
NETS - 5323, 5324, 5307, 5325 (609)273-1474, 1593                                                                              PSE&G ENC PSE&G OPERATIONS ROOM:                                                                          MEDIA ROOM NETS - 5300/ENC MGR 5301/0PS SPVR
        - 5303/LD-TECH                    -                                1}609 )273-2263,      2488, 2539, 2690,  2691, 2774 5314/SPKR PHONE                                                  I 609)273-2787,      2873, 3156, 3257 I  3379, - 3380 5318/FAX                                                        I~ 609)273-36891      3793, 4388, 5895,  5928, 5997 (609)273-1961, 2261, 1948                                                    609 )273-6340,    6387, 6475, 6593,  6874, 6894 ENC CONFERENCE ROOM:                                                        ,609)273-7596,      7624, 7689, 7719,  7789, 7882 609)273-7935,      7968, 8004, 8092,  8129, 8185
                                                        - TC -
I~
'JETS - 5327
( 609 )273-1690, 1702. 1883                                                NETS -      N/A SPARE/UNASSIGNED NETS:                                        RM 5306, 5309, 5313 i+/-===============================:=:J 3.3.7 REV. 1
 
SECTION 3.4 PLAYER PARTICIPANT'S EVALUATION REPORT Drill Type: Artificial Island Annual Exercise
.Date:      June 23, 1993        Drill Number:    S93-03 Your Emergency Position
 
==Title:==
Facility:  (circle one)    SIM    osc  TSC  CP    EOF  ENC Summary of Comments/Deficiences/Suggestions Positive Observations:
Facility/Equipment problems:
                                ~~~~~~~~~~~~~~~~~~~~~---
Other comments/concerns/suggestions,etc:
Submitted by:                                  (continue on back (optional)                    if needed)
* 3.4.0
 
SECTION 3.4 PLAYER PARTICIPANT'S EVALUATION REPORT Drill Type: Artificial Island Annual Exercise
* Date:      June 23, 1993          Drill Number:      893-03 Your Emergency Position
 
==Title:==
Facility:    (circle one)    SIM    osc  TSC    CP    EOF  ENC Summary of Comments/Deficiences/Suggestions Positive Observations:
Facility/Equipment problems=~~~~~~~~~~~~~~~~~~~~~~
Other  comments/conc~rns/suggestions,etc:
Submitted by:                                      (continue on back (optional)                      if needed)
* 3.4.0
 
SECTION 3.4 PLAYER PARTICIPANT'S EVALUATION REPORT Drill Type: Artificial Island Annual Exercise
~ate:        June 23. 1993        Drill Number:    S93-03 Your Emergency Position
 
==Title:==
Facility:  (circle one)  SIM    osc  TSC  CP    EOF  ENC summary of Comments/Deficiences/Suggestions Positive Observations:
Facility/Equipment problems:~~~~~~~~~~~~~~~~~~~~~-
                                          -.~
Scenario problems:~~~--'-~~~~~~~~~~~~~~~~~~~~~~~
Other comments/concerns/suggestions,etc:
Submitted by:                                  (continue on back (optional)                    if needed)
* 3.4.0
 
SECTION 3.4 PLAYER PARTICIPANT'S EVALUATION REPORT Drill Type: Artificial Island Annual Exercise
.Date:      June 23, 1993        Drill Number:    S93-03 Your Emergency Position
 
==Title:==
Facility:  (circle one)    SIM    osc  TSC  CP    EOF  ENC Summary of Comments/Deficiences/Suggestions Positive Observations:
Facility/Equipment problems:
                                ~~~~~~~~~~~~~~~~~~~~~-
Other comments/concerns/suggestions,etc:
Submitted by:                                  (continue on back (optional)                    if needed)
* 3.4.0
 
SECTION 3.4 PLAYER PARTICIPANT'S EVALUATION REPORT Drill Type: Artificial Island Annual Exercise
~ate:        June 23, 1993        Drill Number:    S93-03 Your Emergency Position
 
==Title:==
Facility:  (circle one)    SIM    osc    TSC  CP    EOF  ENC Summary of Comments/Def iciences/Suggestions Positive Observations:
Facility/Equipment problems=~~~~~~~~~~~~~~~~~~~~~-
Other conunents/concerns/suggestions,etc:
Submitted by:                                  (continue on back (optional)                    if needed)
* 3.4.0.
 
EXERCISE.SIGN-IN SHEET Drill Type: Artificial Island Annual Exercise Drill Number:    S93-03        Facility: SIM    osc  TSC  CP  EOF ENC
.Time:    08:00 to    16:00    hrs.
* Date: June 23, 1993 Social Security      1. Print Name                    Emergency Plan Number            2. Signature                  Position I Title 1.
2.
1.
2.
1.
: 2.              -.*
1.
2.
1.
2*
* 1.
2.
1.
2.
1.
2.
1.
2.
1.
2.
1.
2*
* 3.5.0
 
EXERCISE SIGN-IN SHEET Drill Type: Artificial Island Annual Exercise Drill Number:    S93-03        Facility: SIM      osc  TSC  CP  EOF ENC
.Time:    08:00 to    16:00    hrs.
* Date: June 23, 1993 Social Security      1. Print Name                      Emergency Plan Number            2. Signature                    Position I Title 1.
2.
1.
2.
1.
: 2.                -.-~
1.
2.
1.
2*
* 1.
2.
1.
2.
1.
2.
1.
2.
1.
2.
1.
2*
* 3.5.0
 
EXERCISE SIGN-IN SHEET Drill Type: Artificial Island Annual Exercise Drill Number:    S93-03        Facility: SIM      osc  TSC  CP  EOF ENC
.Time:    08:00 to    16:00  hrs.                Date: June 23. 1993 Social Security      1. Print Name                      Emergency Plan Number            2. Signature                    Position I Title 1.
2.
1.
2.
1.
: 2.              .._ ...
1.
2.
1.
2.
* 1.
2.
1.
2.
1.
2.
1.
2.
1.
2.
1.
2*
* 3.S.O
 
EXERCISE SIGN-IN SHEET Drill Type: Artificial Island Annual Exercise Drill Number:      S93-03        Facility: SIM  osc  TSC  CP  EOF ENC oa:oo  to  16:00    hrs.            Date: June 23, 1993 Social Security      1. Print Name                  Emergency Plan Number            2. Signature                  Position I Title 1.
2.
1.
2.
1.
: 2.                -.*
1.
2.
1.
2*
* 1.
2.
1 ..
r 2.
1.
2.
1.
2.
1.
2.
1.
2*
* 3.5.0
 
SECTION 4.0
* ARTIFICIAL ISLAND ANNUAL EXERCISE (893-03)
REFEREE/OBSERVER INFORMATION SECTION #  SECTION NAME                    PAGE #
4.1    Referee/Observer/Player Lists    4 .1. 0 4.2    Referee/Observer Instructions    .4. 2. 0 4.3    Observation Sheets (Referee's)    4.3.18 4.4    Phone Lists (NETS, DID, ESSX)    4.4.0
* 4.0.0
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS REFEREE/SCENARIO DEVELOPMENT ASSIGNMENT LIST (S93-03)
* BOOK NO.
: 1. JOE PIERSON NAME SIML  -
LOCATION/DUTIES LEAD REF - SNSS & CR OVERALL 2 . JEFF JOHNSON              SIML  - OPERATIONS/DSC INTERFACE 3*  JOHN NICHOLS (CORE CORP) SIML  - EOP USAGE/SIMULATOR CONTROL
: 4. JIM ELLIS                SIML  - OPERATIONS/EOPs
: 5. BILL WECKSTEIN            SIML  - COMMUNICATIONS/RMS DATA
: 6. MITCH DIOR                  CR - SIMULATOR/PLANT INTERFACE
: 7. SAM JONES                  osc -  LEAD REF - OSCC & OSC OVERALL
: 8. TED NEUFANG                osc -  RAD PRO ACTIVITIES - OSC
: 9. LARRY ZITKEVITZ            osc -  TEAM ACTIVITIES
: 10. KARL GOEBEL                osc -  TEAM ACTIVITIES
: 11. VIC LOWENSTEN              osc -  TEAM ACTIVITIES
: 12. DAVE CARON                  asc -  TEAM ACTIVITIES
: 13. JIM CORBETT                osc -  TEAM ACTIVITIES
: 14. BOB SETTLE                  osc -  TEAM ACTIVITIES
: 15. TOM MCILVAINE              osc -  FIRE BRIGADE ACTIVITIES
: 16. DAVE SCULL                    CP - LEAD REF - CP OVERALL
: 17. DAVE KELLY                    CP - RAD PRO ACTIVITIES
: 18. JOHN THEURER                  CP - CHEMISTRY ACTIVITIES
* 19.
20.
21.
22.
23.
24.
CRAIG BANNER RAY REECE TERRY CELLMER BILL CIANFRANI DONNA AZZARO GLEN PARKHURST TSC TSC TSC TSC TSC TSC HEAD REF - TSC OVERALL RAD PRO ACTIVITIES RAD PRO ACTIVITIES ENGINEERING ASSESSMENT ADMIN SUPPORT ONSITE FIELD TEAM
: 25. JOE LOEB                  TSC  - SECURITY ACTIVITIES
: 26. JOHN ERHARDT              TSC  - ENGINEERING DATA
: 27. BARRY WEISER                MGH - GUARD HOUSE ACTIVITIES
: 28. LARRY REITER              EOF  - LEAD REF - EOF LEADS/OVERALL
: 29. ERIC KATZMAN              EOF  - RAD PRO ACTIVITIES
: 30. BOB YEWDALL I
EOF  - RAD PRO ACTIVITIES
: 31. JOHN MUSUMECI              EOF  - ENGINEERING
: 32. PHIL DUCA                  EOF  - SITE SUPPORT STAFF
: 33. KAREN ROOTS                EOF - ADMIN SUPPORT
: 34. LUCIUS CLARK                EOF - OFFSITE FIELD TEAM
: 35. DICK GRANBERG              EOF - OFFSITE FIELD TEAM
: 36. BRIAN GORMAN                ENC - LEAD REFEREE  - ENC OVERALL
: 37. TOM BROWN                  ENC - OPERATIONS -  COMMUNICATION
: 38. DAVE BURGIN                ENC - OPERATIONS -  STATE INTERFACE
: 39. JOHN MOONEY                ENC - OPERATIONS -  MEDIA INTERFACE
: 40. DANA COOLEY                ENC - OBSERVER REFS93-03                        4.1.0
 
GRADED EXERCISE (S93-03)
EXERCISE PLAYER ASSIGNMENT LISTING NO.          NAME                    LOCATION/POSITION
: 1. R. Olson                      SIM  -  SNSS
: 2. P. Koppel                    SIM  -  NSTA J  J. Konovalchick              SIM  -  NSS
: 4. w. Murr                      SIM  -  NCO
: 5. R. Halter                    SIM  -  NCO
: 6. R. Sharkey                    SIM  -  Communicator (CM2)
: 7. G. Meekins                    SIM  -  Communicator (CMl)
: 8. OPEN                          SIM  -  NRC Resident
# 9. c. Lynch                        osc  -  Coordinator
# 10. R. Brittingham                osc  -  Maintenance Supervisor
# 11. K. Greever                    osc  -  Shift Control Tech I&C
: 12. T. Hunt                      osc  -  Cont Tech Elec
# 13. F. Picone                      osc  -  I & c Supervisor
: 14. G. Sowinski                  osc  -  Nuc Tech Machinist
# 15. F. Miccio                    osc  -  Shift Cont ~ech Elect
: 16. H. Davenport                  OSC  -  Cont Tech I & c
: 17. M. Byrwa                      osc  -  Nuc Tech Welder
# 18. T. O'Grady                    OSC  -  Operations Supervisor
# 19. w. Monical                    osc  -  Equipment Operator
# 20. J. Osborne                    osc  -  Equipment Operator
# 21. D. Harrigan                  osc  -  Equipment Operator
# 22. J. scanish                    osc  -  Equipment Operator
# 23. G. Gauding                    osc  -  Radwaste Operator
: 24. D.
: 25. E.
# 26. K.
: 27. J.
: 28. c.
# 29. J.
Burbage Kabalevich O'Hare Lewis Day D. Miller osc OSC osc OSC osc osc Relay Supv Relay Tech Rad Pro Supv Exp Cont Rad Pro Tech Rad Pro Tech Fire Brigade supv
: 30. R. Chambers                  osc  -  Fire Brigade
: 31. K. Collins                    osc  -  Fire Brigade
: 32. c. Wolf                      osc  -  Fire Brigade
: 33. R. Vaughn                    osc  -  Fire Brigade
: 34. T. Denney                    osc  -  Fire Brigade
: 35. c. Hughes                    osc  -  Duty Storekeeper
: 36. w. George                    osc  -  Planner
: 37. K. Webb.                      OSC  -  Administrative Clerk
# 38. W. Hunkele                    CP  -  Rad Pro Supv IN Plant
# 39. R. Maza                      CP  -  Chem supv
: 40. J. Adams                      CP  -  Chem Tech/PASS
: 41. s. Lehman                    CP  -  Chem Tech/PASS
: 42. N. DiJoseph                  CP  -  Shift Rad Pro Tech
: 43. J. Klausner                    CP -  Rad Pro Tech
: 44. G. Ondricek                    CP -  Rad Pro Tech
: 45. N. Lopatin                    CP -  Onsite Monitor 593-03                          4.1.1
 
GRADED EXERCISE (S93-03)
EXERCISE PLAYER ASSIGNMENT LISTING NO.          NAME                      LOCATION/POSITION
: 46. M. Clark                          CP - onsite Monitor
: 47. S. Pike                          TSC - Hope Creek Rad Pro Tech
: 48. M. Raddi                        TSC - Hope Creek Rad Pro Tech
  # 49. c. Vondra                        TSC - EDO
  # 50. J. Wray                          TSC - RAC
  # 51. B. Gallaher                      TSC - TSS
: 52. R. Potter                        TSC - Admin Support Supv
: 53. G. Thomson                      TSC - EPA
: 54. J. Hoffman                      TSC - Security Liaison
: 55. D. Ruyter                        TSC - Rad Pro Supv Off Site
: 56. H. Miller                        TSC - Chemistry Supervisor
: 57. c. McKenna                      TSC - Rad Pro Tech - Radio
: 58. M. Press                        TSC - Rad Pro Tech - Dose Asses
: 59. K. Pike                          TSC - Tech Supp Team Leader
: 60. L. Miceli                        TSC - Electrical Engineer
: 61. J. Wiedemann                --..TSC - Mechanical Engineer
: 62. W. Lowry                        TSC - controls Engineer
: 63. W. Evans                        TSC - Core Thermal Engineer
: 64. G. Schwartz                      TSC - Nuclear Fuels Engineer
: 65. w. Cornman                      TSC - Communicator
: 66. M. Batushansky                  TSC - Communicator
: 67. C. Smith                        TSC - Admin Support
: 68. P. Rose                          TSC - Admin Support
: 69. c. Simmermon                    TSC - Admin Support
: 70. T. Cleveland                    TSC - Admin Support {TDR)
: 71. TBA - Renwick                    TSC - Security Force Member
: 72. OPEN                            TSC - NRC Resident
: 73. c. Connor                        EOF - ERM
: 74. J. Trejo                        EOF - RSM
: 75. M. Bursztein                    EOF - TSM
: 76. B. McKeever                      EOF - ASM
: 77. B. Preston                      EOF - SSM
: 78. D. Branham                      EOF - Rad Assess Staff
: 79. s. Gillespie                    EOF - Rad Assess staff
: 80. J. Hedge                        EOF - Rad Assess staff
: 81. Do Miller                        EOF ~ Rad Assess Staff
: 82. M. Simpson                      EOF - Rad Assess Staff
: 83. L. Piccirelli                    EOF - Rad Assess staff
: 84. E. Karpe                        EOF - Field Team comm
: 85. OPEN                            EOF - Off Site Team
: 86. J. Jimcosky                      EOF - Off Site Team
: 87. A. Valeri                        EOF - Off Site Team
: 88. J. Willoughby                    EOF - Off Site Team
: 89. J. O'Neil                        EOF - Off Site Team
: 90. R. Villar                        EOF - Licensing Support
: 91. H. Berrick                      EOF - System Engineer
: 92. M. Danak                        EOF - System Engineer
* 93.
94.
95.
96.
S93-03 D. Kline
: c. Williamson H. Pinelas R. Chan 4.1.2 EOF EOF EOF EOF System Engineer System Engineer System Engineer Controls Engineer
 
GRADED EXERCISE (S93-03)
EXERCISE PLAYER ASSIGNMENT LISTING NO.          NAME                      LOCATION/POSITION
: 97. L. Hajos                        EOF  -  Electrical Engineer      *
: 98. S. Cuff                          EOF  -  -~dmin support
: 99. T. Weldy                        EOF  -  Admin support 100. B. Powell                        EOF  -  Admin Support 101. D. Hadden                        EOF  -  Admin Support 102. J. Hollingshead                  EOF  -  Admin support 103. A. Gross                        EOF  -  Admin Support - RP 104. J. Blauvelt                      EOF  -  Personnel Supervisor 105. J. Donahue                      EOF  -  Purchasing Support 106. G. Sayer                        EOF  -  Material Control 107. c. Bersak                        EOF  -  SSM Ops .Staff 108. v. Bottorff                      EOF  -  SSM Staf&deg;f (CMl) 109. T. Byykkonen                    EOF  -  SSM Staff (CM2) 110. M. Ivanick                      EOF  -  Security Liaison 111. J. Schaffer                      EOF  -  EPA 112. T. Di Guiseppi                  EOF  -  EPC 113. TBA - Renwick                * :*EOF  -  Security Force Member 114. OPEN                            EOF  -  Security Force Member 115. G. Bachman                      EOF  -  Public Info Liaison 116. M. Zeigler                      EOF  -  Telecommunications Supp 117. s. Miltenberger                  ENC  -  Company Spokesperson 118. M. camp                          ENC  -  ENC Manager 119. c. Florentz                      ENC  -  Comm Supv 120. P. Williams                      ENC  -  Lead Tech Advisor
* 121. E. Liden                        ENC  -  Tech Advisor 122. H. Lowe                          ENC  -  Tech Advisor 123. w. Stewart                      ENC  -  Staff Writer 124. H. Stiles                        ENC  -  Staff Writer 125. c. carter                        ENC  -  Media Monitor 126. D. Drummond-Wolfrom              ENC  -  Media Monitor 127. F. Schnarr                      ENC  -  Industry coord 128. J. Wallace                      ENC  -  Rumor Control Coord 129. R. Merritt                      ENC  -  Media Info Line Supv 130. c. Vitale                        ENC  -  Media Info Operator 131. A. Moore                        ENC  -  Media Info Operator 132. R. Raymond                      ENC  -  Media Info Operator 133. P. Hires                        ENC  -  Media Info Operator 134. S. Phillips                      ENC  -  Ops supervisor 135. B. Carlson                      ENC  -  Admin Supp 136. L. Maahs                        ENC  -  Admin Supp 137. D. Leitz                        ENC  -  Admin Supp 138. s. Paglia                        ENC  -  Admin Supp 139. D. Shuman                        ENC  -  Admin Supp 140. c. Traum                        ENC  -  Admin Supp 141. OPEN                            ENC  -  Gov. Affairs Coordinator 142. P. Jefferson                    ENC  -  Audio visual serv coord-143. TBA - Renwick                    ENC  -  Security Force Member 144. J. Gomez                        ENC  -  M & s Support 593-03                          4.1.3
* SECTION 4.2 ARTIFICIAL ISLAND EMERGENCY PLAN DRILL/EXERCISE INSTRUCTIONS FOR REFEREES AND OBSERVERS
: 1. Referees are assigned by PSE&G to all key functional areas to control and evaluate the exercise. In addition, they are prepared to accompany teams into the field (onsite and offsite) to provide data and event messages that support the overall exercise scenario.
Observers may also be assigned to provide additional feedback regarding the effectiveness of the exercise and the plan.
: 2. Onsite Referees/ Observers will coordinate their activities with the Head Referee in the Technical Support Center. If unable to contact the Head Referee, then contact the osc Lead Referee. Offsite Referees/ Observers will contact the EOF Lead Referee.
: 3. Message forms and simulated operational/ radiological data are used to initiate, modify, and complete the events that comprise the overall scenario.
Two kinds of messages are used:
* controlling messaaes used as the primary means of implementing scenario events by presenting postulated alarms or indications to the appropriate player.(s) to supplement or augment Simulator indications.
Contingency messages used at the discretion of the Head Referee in order to maintain the scenario timeline or prompt specific response activities that were planned to be evaluated (exercise objectives related).
Messages are expected to be provided to the designated drill player at the time specified on the form. Although generally self sufficient, the referee may follow-up with an explanation of the message to ensure that it is understood.
Referees will not initially provide information to the players regarding scenario development or the resolution of problem areas encountered. The players are expected to obtain information through their own or~anization and exercise their own judgment in determining response actions and resolving problems. In the event of incorrect or incomplete responses, or if the player indicates lack of knowledge of how to proceed, the referee will prompt the player with the necessary instructions or contingenc&#xa5; messages and will note the deficiency for later critique *
* 4.2.0
: 4. The scenario events are hypothetical. Any portions of the scenario depicting plant system operational transients are simulated events. No Control Room actions, or reactions involving operation of plant systems, or affecting generation capability will be initiated. All exercise scenario messages will begin and end with the words, "THIS IS A DRILL".
Referees stationed at areas vital to maintaining generating capability should be especially aware, and take extra precautions, in issuing messages or giving instructions regarding the scenario events.
: 5. Where practical, operational and radiological data will be displayed on the Simulator in real time or in hard copy format at locations where the data would normally be available to the player during a real emergency. Referees will control the use of this irif ormation to ensure that the correct data is displayed at the correct time and** to provide interpolated data between prepared time intervals.
: 6. Players may occasionally insist that certain parts of the scenario are unrealistic. The lead referees have the authority to clarify any questions regarding scenario content. However, in some cases, it may be necessary to exercise "scenario license" to preserve the continuity of the drill and meet the objectives of the exercise.
Players are expected to demonstrate good drillsmanship by accepting the referee's decision and continue to play while noting their concerns for resolution at the critique.
: 7. Prior to drill commencement, lead referees shall establish communications with their counterparts in each facility.
All referee watches and clocks shall be synchronized with the Simulator to ensure the proper control of messages and data per the timeline of the scenario.
: 8. osc Referees and those observers or evaluators who intend to follow team activities must be prepared ahead of time to do so. ( i.e. Vital Area access, RWP sign-in, hard hats and glasses if needed, etc.)
: 9. Scenario problems not covered in this exercise manual must be ref erred to the Head Referee for resolution if they are in any way affecting the safe or effective conduct of this exercise.                  *
: 10. For drills exceeding four hours, a meal may be provided by PSE&G, however, there is no specific meal time break in the scenario. All participants, including referees, should be relieved for their meal as time permits, but not ~o interfere with the exercise.
4.2.1
* INSTRUCTIONS FOR REFEREES/ OBSERVERS (cont'd)
DO's
: 1. Know the overall Referee/ Observer organization. Know especially the Lead Referee in your facility or area.
: 2. Remember that there are two clocks:
Scenario time, starting at OO:OO and real clock time.
3*  Identify the players you are controlling or observing.
: 4. Identify yourself to the players as their referee/ observer.
Ensure all participants ~ear ID provided (i.e. shirts, hats)
: 5. Determine the phone (or radio for field teams) that you will use to maintain communications with your lead referee.
: 6. Position yourself to maximize your effectiveness in issuing messages and controlling the-responses of the recipients.
: 7. Keep the play on schedule by issuing messages on time. Refer to the overall scenario timeline.
: 8. Make sure the players understand what the message is trying to convey, but do not prompt what is expected of the player to perform.
9*  Allow the players reasonable flexibility to do their functions and demonstrate their skill, knowledge, and initiative.
: 10. Remember to call the Head Referee to report if plarers actions depart significantly from the scenario script and may affect the overall scenario timeline. If necessary, intervene with the player actions to put the scenario back on track, "for scenario control".
: 11. Identify yourself to any Federal evaluators {NRC/FEMA). Make them reasonably aware of rour interactions with the players as you control the scenario.
: 12. Make notes on good and bad things that happen. Note both strengths and weaknesses in individual performances as well as the plan. Attempt to assess the causes of poor performance and use the observation checklists.
: 13. Attend the post drill critique session to provide your comments and recommendations to the Lead Referees.
: 14. Remember, if a real emergency or o~erational ~roblem occurs call off your portion of the exercise and notify the Head Referee immediately.
: 15. Ensure that actual problems with plant equipment or structures that are discovered during the exercise, if any, are identified to the duty SNSS and documented by the players if necessary (EMIS tagging).
4.2.2
 
INSTRUCTIONS FOR REFEREES/ OBSERVERS (cont'd)
* DON'Ts
: 1. Don't leave your post at key times.
: 2. Don't prompt the players except through use of approved messages.
: 3. Don't coach the players.
: 4. Don't criticize or praise the player's actions during the play of the drill.
: 5. Don't allow the players to introduce events or modify the data.
In other words, don't deviate from the scenario timeline unless such actions are expressly permitted by the Head Referee.
: 6. Don't allow the player's actions, or your own, to violate normal plant rules regarding security, safety, or radiological controls. Exercise your authority as a referee at all times to ensure plant and personnel safety.
: 7. Don't allow the players to be distracted by the presence of observers or evaluators. These participants may wish to ask questions of the players in order to better understand the actions they are observing. such questions are permissible,  **
but should be directed first to the referee who may provide the answer or at least ~artici~ate in the interview with the player to ensure there is no misunderstanding.
4.2.3
* SECTION 4.3
* Page #
ARTIFICIAL ISLAND ANNUAL EXERCISE REFEREE OBSERVATION SHEETS 4.3.1    Control Room Command and Control/Operations 4.3.2    Control Room Notifications and Communications 4.3.3    TSC Command and Control/Security 4.3.4    TSC Technical Support 4.3.5    TSC Radiological Assessment/Chemistry Response
: 4. 3 . 6. TSC Notification and Communication/
Administration Support 4.3.7    osc command and Control/Operations/
Communications 4.3.8    osc Support Personnel
* 4.3.9 4.3.10 4.3.11 Chemistry (PASS) Sampling and Analysis Teams Control Point Command and Control/Operations/
Communications Inplant/Onsite/Offsite Radiation Monitoring Teams 4.3.12    EOF Radiological Assessment 4.3.13    EOF Technical Assessment 4.3.14    EOF Command and Control/Operations/Security 4.3.15    EOF Communications/Administrative Support 4.3.16    ENC Public Information*and Media Relations 4.3.17    Exercise Control and Evaluation 4.3.18    Observation/Evaluation Sheet (Referees/Observers) 4.3.20    Controller Critique Guidelines
* 4.3.0
* 4.3.l OBSERVATION CHECKLIST l>.rea/Function Observed: Control Room Command and Control/Operations Name:                                      Exercise Date:
(check one)
Exercise Objectives to be demonstrated                  Adequate  Inadequate A. 2  Provide technical and operational information concerning plant status/
prognosis to appropriate TSC and EOF emergency personnel.
B.1    Recognizing and classifying emergency conditions.                        -*
C.l    Implement appropriate Emergency Plan procedures.
C.2    Transfer responsibilities of Emergency Coordinator.
* C.3    Command and control of Control Room emergency response.
Establishing and directing osc team priorities through the oscc.
C.5    Identify changing plant conditions and brief Control Room personnel concerning degraded or improved plant status.
F.1    Recognizing operational symptoms and parameters indicative of degrading plant conditions.
Signed:
Note:    Use the back of this sheet to give details on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emerqency Preparedness Manaqer, MC-H37 *
* 4.3.1
 
4.3.2 OBSERVATION CHECKLIST Area/Function Observed: Control Room Notifications and Communications Name:                                    Exercise Date:
(check one)
Exercise Objectives to be demonstrated                Adequate  Inadequate A.2  Communications capabilities between Emergency Response Facilities.
B.l  Implement notifications and data communications in accordance with procedures.
B.2  capability to perform timely notifications to the States of New Jersey and Delaware.
B.3  capability to notify and communicate with the NRC via secondary phone lines.
F.2  Proper communciations methods and timely notifications to offsite agencies.
Signed:
Note:  Use the back of this sheet to give details on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emerqency Preparedness Manaqer, MC-N37.
4.3.2
* 4.3.3 OBSERVATION CHECKLIST Area/Function Observed: TSC Command and Control/Security Name:                                    Exercise Date:
(check one)
Exercise Objectives to be demonstrated              Adequate    Inadequate A.l  Activation and staffing of the Technical support Center.
* B.l  Recognizing and classifying emergency conditions.
C.l  Implement appropriate Emergency*Plan procedures.
C.2  Transfer responsibilitie~ of Emergency Coordinator.
C.3  Command and control of TSC emergency response.
C.4  Effective organizational control and
* c.s I.1 integrated emergency response
* Identify changing plant conditions and brief TSC personnel concerning degraded or improved plant status.
Establishing and controlling security access onsite and maintaining personnel accountability within the Protected Area.
Signed:
Note:    Use the back of this sheet to give details on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emergency Preparedness Manager, MC-H37 *
* 4.3.3
 
4.3.4 OBSERVATION CHECKLIST Area/Function Observed: TSC Technical Support/Engineering
:rame:                                  Exercise Date:
(check one}
Exercise Objectives to be demonstrated              Adequate    Inadequate B.3    Communicate technical information between emergency response facilities.
C.l    Implement appropriate Emergency Plan procedures.
H.1    Develop alternative methods or equipment alterations in response to accidents affecting plant systems or components.
H.2    Assess plant operational data and provide recommendations concerning accident mitigation and engineering based PAR's when appropriate.
H. 3  Identify or recognize when fission product boundaries are breached.
H.4    Estimate fuel damage using available data should core damage occur.
Signed:
Note:  Use the back of this sheet to give details on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emergency Preparedness Manager, XC-N37.
4.3.4
* 4.3.S OBSERVATION CHECKLIST Area/Function Observed: TSC Radiological/Chemistry Name:                                    Exercise Date:
(check one)
Exercise Objectives to be demonstrated              Adequate    Inadequate C.1  Implement appropriate Emergency Plan procedures.
C.4  Coordinate, control, and deploy radiological monitoring teams.
D.1  Communicate with and control fie&#xa3;d monitoring teams and receipt and analysis of field data.
D.2  Determine recommendations of PAR's based on dose projections or plant chemistry.
G.1  Decision making for limiting exposure of emergency response personnel.
Perform dose assessment and effectively distribute dosimetry and thrroid blocking agents, if appropriateo Signed:
Note:    Use the back of this sheet to give details on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emergency Preparedness Manager, MC-N37 *
* 4.3.S
 
4.3.6 OBSERVATION CHECKLIST Area/Function Observed: TSC Notifications/Communications/Admin. Support Name:                                  Exercise Date:
(check one)
Exercise Objectives to be demonstrated              Adequate    Inadequate A.2  Communications capabilities between emergency response facilities.
A.3  Facilities and displays to support emergency operations.
B.2  Capability to perform timely notifications to the states of New Jersey and Delaware.
B.3  Communicate technical information between emergency response facilities.
B.3  Capability to notify and communicate with the NRC via the Emergency Notification System (ENS).
B.4 F.2 Capability to formulate around the clock emergency response duty rosters to allow extended activation of emergency response.
Proper communciations methods and timely notifications to offsite agencies.
Signed:
Note:  Use the back of this sheet to give details on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emerqency Preparedness Manaqer, MC-H37.
4.3.6
* 4.3.7 OBSERVATION CHECKLIST Area/Function Observed: OSC Command and Control/Operations/Communications Name:                                    Exercise Date:
(chec~  one)
Exercise Objectives to be demonstrated              Adequate    Inadequate A.2  Communications capabilities between emergency response facilities.
B.3  communication of technical information between the OSC and other ERFs.
C.1  Implement appropriate Emergency Plan procedures.
F.4  Command and control functions within the osc.
F.5  Properly set-up, staff, and operate the-OSC.
Coordinate the dispatch of OSC teams to meet SNSS priorities.
Adequate health physics support for osc dispatched teams deployed in areas of ra_diological concern. .  .
Signed:
Note:  Use the* back.of this sheet to give details -on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emergency Preparedness Manager, MC-N37.      .
* 4.3.7
 
4.3.8 OBSERVATION CHECKLIST Area/Function Observed: osc Support Personnel Name:                                    Exercise Date:
(check one)
Exercise Objectives to be demonstrated              Adequate  Inadequate F.3  Implement protective actions for site personnel dispatched from the osc.
F.5  Properly set-up, staff, and operate the osc.
F.6  Capability of dispatched OSC teams to respond as directed by the oscc.
G.3  Adequate health physics support for osc dispatched teams deployed in areas of radiological concern.
Signed:
Note:  Use the back of this sheet to give details on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emergency Preparedness Manager, MC-N37.
4.3.8
* 4.3.9 OBSERVATION CHECKLIST Area/Function Observed: Chemistry Sampling and Analysis/PASS Name:                                    Exercise Date:
(check one)
Exercise Objectives to be demonstrated              Adequate    Inadequate A.2  Provide technical information concerning plant status/chemistry to the TSC.
c.1  Implement appropriate Emergency Plan procedures.
D. 3  Capability to obtain and analyze *vsamples via the PASS sampling system.              **
G.3  Adequate health physics support for Chemistry sampling teams deployed in areas of radiological concern.
Optional for this exercise. Should be demonstrated if the scenario and time permit.
Signed:
Note:    Use the back of this sheet to give details on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emergency Preparedness Manager, MC-N37 *
* 4.3.9
 
4.3.10 OBSERVATION CHECKLIST Area/Function Observed: Control Point Command and Control/Communications Name:                                          Exercise Date:
(check one)
Exercise Objectives to be demonstrated                    Adequate    Inadequate A.2    Communications capabilities between emergency response facilities.
B.3    Communication of technical information between the CP and other ERFs.
C.l    Implement appropriate Emergency Plan procedures.
C.3    Command and control of Control Point emergency response.
G.2    Methods and resources for distributing dosimetry and thyroid blocking agent to emergency responders, if appropriate.
:;
* 3 Adequate health physics support for OSC dispatched teams deployed in areas of radiological concern.
* Signed:
Note:  Use the back of this sheet to give details on any 11 inadequate 11
* demonstrations of objectives.
Return completed checklist to the Emerqency Preparedness Manaqer, MC-N37.
4.3.10
* 4.3.ll(a) OBSERVATION CHECKLIST Area/Function Observed: Inplant Monitoring Teams Name:                                    Exercise Date:
(check one)
Exercise Objectives to be demonstrated              Adequate    Inadequate c.1  Implement appropriate Emergency Plan procedures.
F.6  Coordinate the dispatch of OSC and CP teams to meet SNSS priorities.
G.2  Methods and resources for distributing dosimetry and thyroid blocking agent to emergency responders, if appropriate.
G.3  Adequate health physics support for osc dispatched teams deployed in areas of radiological concern .
Siqned:
Note:    Use the back of this sheet to qive details on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emerqency Preparedness Manaqer, KC-Nl7 *
* 4.3.11(a)
 
4.3.ll(b) OBSERVATION CHECKLIST Area/Function Observed: Onsite Monitoring Teams ilame:                                  Exercise Date:
(check one)
Exercise Objectives to be demonstrated              Adequate    Inadequate C.l    Implement appropriate Emergency Plan procedures.
D.l    communicate radiological data from the field to the TSC and respond to control.
G.2    Methods and resources for distributing dosimetry and thyroid blocking agent to emergency responders, if appropriate.
Signed:
Note:  Use the back of this sheet to give details on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emerqency Preparedness Manaqer, MC-H37.
4.3.11(b)
* 4.3.ll(c) OBSERVATION CHECKLIST Area/Function Observed: Offsite Monitoring Teams Name:                                  Exercise Date:
(check one)
Exercise Objectives to be demonstrated              Adequate    Inadequate C.1  Implement appropriate Emergency Plan procedures.
D.1  Communicate radiological data from the field to the EOF and respond to control.
G.2  Methods and resources for distri~uting dosimetry and thyroid blocking agent to emergency responders, if appropriate .
signed:
Note:  Use the back of this sheet to give details on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emerqency Preparedness Manager, MC-N37.
4.3.1l(c)
 
4.3.12 OBSERVATION CHECKLIST Area/Function Observed: EOF Radiological Assessment
* Name:                                    Exercise Date:
(check one)
Exercise Objectives to be demonstrated              Adequate  Inadequate C.1  Implement appropriate Emergency Plan procedures.
C.4  Coordinate, control, and deploy radiological monitoring teams.
D.1  Communicate with and control field monitoring teams.and receipt and analysis of field data.
D.2  Determine recommendations of PAR's based on dose projections or plant chemistry. *    .
G.1  Decision making for limiting exposure of emergency response personnel.
G.2  Perform dose assessment and effectively distribute dosimetry and thfr'oid blocking agents, if appropriate.
Signed:
Note:  Use the back of this sheet to give details on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emarq*ncy Preparedness Manaqer; MC-N37.
4.3.12
* 4.3.13 OBSERVATION CHECKLIST Area/Function Observed: EOF Technical Assessment/Engineering Name:                                    Exercise Date:
(check one)
Exercise-Objectives to be demonstrated                Adequate  Inadequate B.3  Communicate technical information between emergency response facilities.
C.l  Implement appropriate Emergency Plan procedures.
H.l  Develop alternative methods or equipment alterations in response to accidents affecting plant systems or components.
H.2  Assess plant operational data and provide recommendations concerning accident mitigation and engineering based PAR's when appropriate.
H.3 Identify or recognize when fission product boundaries are breached.
Signed:
Note:    Use the back of this sheet to give details on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emergency Preparedness Manaqer, MC-N37 *
* 4.3.13
 
4.3.14 OBSERVATION CHECKLIST Area/Function Observed: EOF Command and Control/Operations/Security
* Name:                                    Exercise Date:
(check one)
Exercise Objectives to be demonstrated              Adequate  Inadequate A.1  Activation and staffing of the Emergency Operations Facility.
B.1  Recognizing and classifying emergency conditions.
C.1  Implement appropriate Emergency*?lan procedures.
C.2  Transfer responsibilities of Emergency Coordinator.
* C.3  Command and control of EOF emergency response.
C.4  Effective organizational control and integrated emergency response.
C.5  Identify changing plant conditions and brief EOF personnel concerning degraded or improved plant status.
D.2  Determination of PAR's based on plant conditions and/or dose projections.
I.l  Establishing and controlling security access to the EOF.
Signed:
Note:  Use the back of this sheet to give details on any "inadequate" demonstrations of objectives.
Return completed checklist to the Emerqency Preparedness Manaqer, MC-537.
4.3.14
 
4.3.lS OBSERVATION CHECKLIST Area/Function Observed EOF Communications/Administrative Support
* Name:
Exercise Objectives to be Exercise Date:
dernonstra~ed (check one)
Adequate      Inadecruate A.2  Demonstrate communications capabilities of the EOF with the Control Room, TSC, and outside agencies B.2  Implement notifications in a timely manner B.3  Demonstrate the communication                                      I of technical information A.3  Facilities and displays are adequate to support emergency operations B.4  Demonstrate the capability to formulate around the clock emergency response duty rosters to allow the extended activation of facilities
* NOTE:
Signed Use the back of this sheet to give details on any items "inadequate" Return completed checklist to the Emerqency Preparedness Manaqer, MC-N37 *
* 4.3.15
 
4.3.16 OBSERVAT~ON  CHECKL~ST Area/Function Observed ENC Public Information and Media Relations Name:
Exercise Objectives to be demonstrated Exercise Date:
(check one)
Adecruate      Inadecruate E.l  Demonstrate the activation and staffing of the ENC A.2  Demonstrate communications capabilities between the ENC and the EOF E.2  Demonstrate the ability to issue coordinated periodic public information releases.    . ...
E.3  Demonstrate ability to provide rumor control and response to inquiries from the general public in a coordinated fashion E.4  Demonstrate ability to provide clear, timely, and accurate briefings to the news media.
A.3  Facilities and displays are adequate to support emergency operations C.l  Implement appropriate Emergency Plan Procedures I.l  Establish and control Security access to the ENC.
NOTE:  Use the back of this sheet to give details on any items "inadequate" Return completed checklist to the Emergency Preparedness Manager, MC-N37.
4.3.16                                  *
* 4.3.17 OBSERVATION CHECKLIST Area/Function Observed Exercise Control and Evaluation Name:                                    Exercise Date:
(check one)
Exercise Objectives to be demonstrated          Adequate      Inadequate J.l  Demonstrate the ability to control the scenario in ac-cordance with the prescribed timeline.
J.2  Demonstrate the ability to provide scenario data and address questions which per-tain to data without prompting J.3  Demonstrate the ability to adequately critique the exercise performance
* NOTE:
Signed Use the back of this sheet to give details on any items "inadequate" Return completed checklist to the Emergency Preparedness Manager, MC-N37 *
* 4.3.17
 
SECTION 4.3 REFEREE/ OBSERVER DRILL EVALUATION REPORT Name:                          Exercise/ Drill Date: JUNE 23, 1993
.ocation: (circle one)      SIM    OSC    TSC    CP  EOF  ENC Exercise/ Drill
 
==Title:==
Artificial Island Annual Exercise (S93-03)
Drill Commenced:                        Drill Terminated:
(time)                                    (time)
Note:  Refer to Critique Guidelines and Exercise/ Drill Objectives OBSERVATIONS - Performance of area observed to include drillsmanship.
Areas of Good Performance by personnel: (continue on back, if needed)
~reas    of Poor or Questionable Performance:  (cont'd on back, if need)
(continued on next page)
Signature:
 
==Title:==
Phone:
* 4.3.18
 
REFEREE /OBSERVER DRILL EVALUATION REPORT (cont'd)
Facility/ Equipment problems or concerns:
Procedure problems or concerns:
(continued on next page)
Signature:
~itle:                                    Phone:
4.3.19a
 
REFEREE /OBSERVER DRILL EVALUATION REPORT (cont'd)
Scenario problems or concerns:
Other problems or comments: (items that don't fit above categories)
                                          -.~
(continued on back, if needed)
Signature:
.Title:                                    Phone:
4.3.19b
* AREAS TO CRITIQUE EMERGENCY PLAN DRILL/EXERCISE CONTROLLER CRITIQUE GUIDELINES
: 1. EMERGENCY RESPONSE ORGANIZATION A. staffing (full response, timely)
B. Facility set up (automatic, tim~l&#xa5;)
: c. Command and control (clear, positive, proactive)
D. EC turnover (effective, timely)
: 2. CLASSIFICATIONS AND NOTIFICATIONS A. Classifications (appropriate, timely)
B. Notifications to site personnel (clear, timely)
: c. Notifications to States/Agencies (clear, timely)
: 3. COMMUNICATIONS                    -~
A. Within Group/Facility (clear, frequent, to the point)
B. Between ERFs (clear, frequent, complete)
: c. Equipment (telephones, telecopiers, radios, PA)
: 4. PROCEDURE COMPLIANCE A. Procedural guidance is sufficient?
B. Procedures (available, complied with)
: c. Procedure forms, lists, data tables (up to date)
* 5.
6.
EXPOSURE CONTROL A.
B.
c.
Exposure minimized when possible (ALARA)
Rad monitoring equip./dosimetry (operable, available)
Protective Action Decisions/Recommendations (correct)
EMERGENCY MITIGATING ACTIONS A. Mitigating actions taken were proper B. Developing problems were anticipated (what if thinking)
: c. Priorities established (clear, SNSS directed, revised as needed)
: 7. FACILITIES A. Functional for response objectives B. Supplies/Equip. (available, calibrated, operable)
: c. Reference documents (available, up to date)
: 8. SCENARIO CONTROL A. Scenario events (realistic, challenging, comprehensive)
B. Scenario data (consistent, sufficient, displayed well)
: 9. DRILLSMANSHIP A. Referees prepared (scenario control, player interaction)
B. Players maintained involvement with drill events
: c. Plant safety (separation of drill events and normal plant operation was adequately addressed)
D. Critique (problems identified, feedback, praise, player input, attendance forms)
* 4.3.20
 
LEAD REFEREE'S NOTE:
: 1. Take control of the critique meeting.
Do not allow it to develop into a gripe session. Cut someone off (politely) if necessary. It will benefit the entire group and they will respect you for it.
: 2. Seek suggested solutions to problems identified.
: 3. Provide positive feedback (praise for good performance) as well as raising items of concern.
: 4. Distribute and collect participant evaluation report forms.
: 5. Collect all attendance forms distributed.
: 6. Limit the participant critique to 60 minutes.
4.3.21
 
NETS QUICK REFERENCE DIRECTORY                                                                                    NETS - OPERATING INST/U!(."J'/ONS
[RED LABELS - PSE&G PRIVATE]                                                                                      [UED LABELS - PSE&G />/Ul~*I TEl SALEM                      EOF          HOPE CREEK                      OFFS/TE TO BdRCE; (Key phanu only)                                    TO CONFEREN.I:&#xa3;.; (Add up tu 8 parli"Y)
SS Artg          NCJS    [Of .Arto      HCJS  ~SS~.A~r~ea~-~N~C~I-S    4 Q~fl~*l~!e.___ _ _~NE~T~S            Dial 4 digit u:hn.-lon                                      Call ht partv 8110.r *Bu.sty * *ignal                                      l'ru1 "Flash          Bu !ton Cammunlcalar 5127
* ERM            5000  Cammunlcalar 5224        HJSP-Dlrec!or          5410          Prue "Flcuh
* Burton, lhen pauH                              Call 2nd party Op1. Oala        11121    RSM            5001  Op1. Dalo      522J    Comm.-NJSP            5400          Di<1I .. I " "8
* Pren ** Flcuh
* 81111011 llSM Slaff    !1002                          Dlsp. Olf.-NJSP        5414        (EnC11r* con**e.-sohun in 8 sec.*)                            Dial "* *
* 4 ** (Brings ull on line)
CR Acta                          Stall    50DJ  CR Arta                  Pub. lnfo.-HJSP        5415 Slaff    !1004                          BN[ Lloson-NJSP        54 Ill      lll!.lSl.gE.....LLNL                                        - O.L!.IS.JJ.1&#xa3;. LIN.&#xa3; AL TE B!Y.tr&#xa3;:
CRl-Op1.          5 I 20  RSM SH. Cal'!. 5005  CR-Ops.        5221    HJSP FAX              5415        Dial 9                                                        Dial "8 " (Aaoeu ESSX I)
CBI-SS/SSS        5121
* llad. Data    5001  CR-SS          11220    NJSP Woodstown        5405        Dial phon* number duired                                      Dial "9 * (Outside Lin*)
CAI-Rod Dalo      11122    TSll          5007  Rad. Data      11222
* If aolling oullid* 609,                                      Dial 1-(Ar"" Code) x.rx-xxxx ISM Slaff      5017  Op. Rndr Rm. 52!2                                        dial I + Area Codi                                            (Thia oriyinn!ee from 201 Area Cu1fr)
CRll-Opa.        !512!          Slaff    !50111                          NJ - BNE              5401 CRll-SS/SSS      11124
* Slaff    5011                            HJ - llNE FAX          541 I  *-------*------------------------                                                            ----    --*- ------- ---    -
Cllll-llad Dalo 9125            Slaff    S020                            HJ - IN[ Lab          5422                                                      FROM A NETS PHONE:
OSC Artg SSM cw1
                                          !1012 son    OSC Arn NJ -    BNE FCP      5421  *-------*          TO NETS
                                                                                                                                              ----.----------~
TO DIMENSION                                  TO ESSX I CMZ            SOU                                                          *-----------+---------------                                                            ------ -- -- ---*- ---- - - . --*
DSC - Coard. 51211        Op1 Data      SD57  QSC - Coard. 52211      Salem County          5402            4 DICIT EXTENSION                                "4" THEN:                                  "8
* THEN:
.ALARA Rev.      9121    Security      SOU    Rad Pro        5227    Salem Caunlr PIO      5425                                                          "429 " SALEM OR                            4 DH:JT EXTENSION Malnt.            !IUO *
* ASM            50011  Main!.          11221
* Cumb. Caunty            540]                                                              HOPE CRl.'EK Wark Cl!. Cir. !llJ7      ASM Slaff      !IDOi  I a C          5221    Cumb. Caun!r PIO      5424                                                              "459" 80F PIM            SOIO                            UC Township            5404  ---------*                            ----~-----------*--**                              --
CP .Artq                  PIM-FAX NRC SOI I SDl!I CP Areq PSE&G
* EAIERGENCY NEWS CENTEn SRPT              5152                    SOlll  SRPT            5230    DEPO Director          5412    MCDIA IN&#xa3;0RM!l[QlL1.J!it...l!O.OM.;          liBCL&#xa3;n!A... BQOM; Chem. Auna. !llJJ
* FEMA          !1021  HP Caunl Rm. SUI
* D[PO OPS/COMM.              5407    (HETS)                        Commercial)    (NETS)              Commerclal)          Commorclal)        Comrnorcial)
NJ            S022                            D[PO - 1.AAO          S4111    -NOH[-                        609 273-0062  15310 NBC          609)273-099 2        609 273-2263 609 27 3-6367 ISC Ar*o                                sou    !SC Area                D[PO AUG FAX          54111                                  609 27 l-0189  *5311            l 609)273-1049          609 271-248!1 609 273-6475 DCL            !5024                                                                                          609 273-02112  15512                                    609 275-2539 609 275-6595 EOO              !5100                  !502!1 [DO            5200    Del. S.P. Comm.        5406                                    609 211-03116  1550!1 FCM4      (609)273-1179          609 273-2690 609 275-667J 155              5t01
* Cant. Rm    i. !50511 JSS            5201
* 609 275-047!1                                            609 275-2691 609 275-6874 II.AC            5102    Roam SO        SOJll  RAC            5202    Kini Ca. EOC          5409                                    609 211-05811  fSE.tG OPEM.lillllS_BO.OM;                609 275-277' 609 2 75- 6894 llad * .A11n1. 510]                          Rad. AHUI.      520J                                                                                                                            609 275-27117 609 275-7595 llad * .A11e11. 5104
* Rad. Data      5204
* Ne*Caall* Ca. EOC        54011    _es..c..t..G.____.._Sl~A~r~r~W~BlllBS JiO.OM; (HCIS) 15300 lCommerclal)
ENC Mgr 15091273-1961          609 2 75-28 73 609 275-7624 510!1                          Chem. Aue11. 520!1                                    (NETS)                        Cornmerclal)    15301    Op1 Spv 609 273-2261            609 273-3156 609 275-76!19 I
llad * .A11111.
Chem, A111u. 11101                              TSTL            52011
* WDCL - (Rodia)          5420      *!5]15                                        15503    Ld Tech                        609 275-3257 609 275-1719 6091271-0607                                            609 275-3379 609 27 5-7111!1 llad. Data      5107
* Admln. Sup. 5207                                      *5516                        609 275-0695    15314    Sptah*r (609)273-1948 Op1. Oala        5109                          Ops./Eng.      !5210                                    *!5Jl7                        609 275-0792    155111    Fa*                            609 2 73-3580 609 275-711112 Op1./Eng.        5110
* Op1./[ng.      5211 *                                    *5J!9                        609 27]-08111                                            609 275-3689 609 275-7935 11111                          Op1./[n11.      !5215 *                                  *532&                                        tlEw....JEBStr. BO.OM;                  609 275-3793 609 273-79611 Op1./Eni.                                      Dp1. Dalo      5201                                                                                    (NETS)            (Cammerclal)          609 273-431111 609 273-11004 Camm. t          11112                                                                                  M[.DJA. MONITOR_ BQQM; Camm. 2          !Ill]
* Camm. {JI      5212                                                                                    i532D Stole        (609)273-1263        609 273-51195 609 275-&092 NRC-Opa          5115
* Camm.
NRC-Comm.
n2    !521J *
                                                                !5217 (NETS)                      (Commerclol)      *5321 15322 609 273-59211 609 273-&129 609 273-5997 609 275-!1!!15 NRC-Rad.        111111                                                                                  115302                      -NONE-NllC-Ca1t1m. 5111                          NRC-Radl.      52111                                                                                  15504 Counly (609)271- 1395              609 273-6340 11117                        NRC-Op11.      !5211 *                                  .C.QUUBI.t:U;LBQQM;                          15305 Counlr                            !il'.!!HE.ll.Hl!SSJGllrn ll[JS; Securllar 11111
* Securllr        5214                                                                    Cornmorclol)
I Admtn. Sup.                                                                                              (NETS)                                      DEL.!WilR[ ROOM;                        (NETS)              (llllS) 115327                        609~273-1690    (NEIS)            (Commerclol)        15306              ,5313 FIRE    SALEM      a  SECURITY                                      609 27J-17DZ                                            15309 MCD. SALEM                                                                          609 273-tllll5  15323 Slate        (!509)275-1474
                                                .llill  .tme.    .llill    .uc_ru        .tlHI&#xa3;B                                                      15324
    *circuit cannot be barged/                  sou      5425    SIJ!I      !IUll        !Ill&                                                      15307 Counly (609)273-1593 15325 Coun!r 0
 
DIMENSION                  fBEIGE            LABELS              (609) 339-XXXXl                DJAJENSJON ESSX I fDEICE            LABELS ( GO!J) 339-XXXX\
BLACK LABELS ( 201) 4.10-XXX.\'
ESSX I                    BLACK LABELS                        (201) 430-XXXX DIRECTORY                                                                    OJ E RA 1'1 NG INSTR l I< 'Tl ONS' 1
SALEM                              EOF                        HOPE CREEK lili ARCA        (!ID    f;SliX I 1:2[ ARf;A      DID      [SS)( I SS ARCA      (!ID  &#xa3;SliX I                                                DIMENSION 39119            COMM                7965 SSS              !1200            EllM                      7877 COMM              5533    8670    RSM              3992    74611  SS            3027                                                          TO ACCESS SS U/I            5201            RSM STAFF        37U      7455    SS            30!1!1                          DIMENSION        ------*------
SS U/2            5202            RSM SlAff        3993    74611  SS            31170                              l'l~OM            TO:              TO:                1"0:
FAX - CALLBACK 5!1811              lSM              3715!1                                                                              SALEM OR            EOF                ESSX I lSM STAFF        3911    75110                                                                    llOPE CRKEK CR ARU                            SSM              3712    75111  CR ARCA COMM                      75011                                                FROM:
Cll I            !1111  111511  CONN                      7!11!1 CR-OPS        3540  798'                                              DIAL          DIAL "4 "          DIAL
* 4 "
Cll 2            5222    11101    ASM                      7511    OPS RUDY RN  35111                                            FOUR DICITS            THEN                THEN PIM              3761      7517                                                  SALElll OR          EXT. XXXX      .. 459  *-xxx.r    '"JJJ    *-x.u.r OSC AREA                          PIL              31111!1          OSI; ARf;A                                  HOPE CREEK NRC              37111    11520 OSC OPS            2!1111 1320    fEMA            3995    151!1  OSC COORD    JIU    7977 SIT[ PROTECTION 2511              NJ              37111    71150  RPS          31!15 NJ              37111                                                          FROM:
MAINTENANCE        9417                                                                                                                  DIAL "4"            DIAL            DIAL "4
* DCL              39U      77211                                                                        THEN        FOUR DICIJ'S              THEN CP AREA                                                              CP AREA                                            EOI'        .. 429 * -xxx.r      EXT. x.rn      * .1.13  "-x.ux OFFSITE SRPT              2144                                              SRPT          3741 OFFSITE      UCONDARJ I 2149 NJSP HP CNT AM    3173 110111 1112-4201    TSC ARCA JSC AREA                          NJSP FAX      1109 1112-011 NJSP-                            EDD          33117 IDO                2700 lSS 2701 7111 7131 WOODSTOWN    (809) 789-0774      TSS UC 3517 3211 1101 1492 RAC                                HJ-BNE        109    1117-2032                                                                                  ESSX I llAD ASSESS.      2702                                              RAD ASSCSS. 341111 NJ-BNE FAX IOI        1117-1354                                              ------~~----------                                    **-        *-. *****.
llAD ASSISI.      2705                                              RAD ASSESS. 3542 Salem Counti 109      711-1955    CHEMISTRY    32!17 llAD ASSISI.      2704                          10!1    711-295!1                                                                                TO ACCESS llAD ASSESS.      2709                                              SECURITY    . 32!12 Cumbuland    IO!I    459-1528    OPS I [HG    so oz  7962                      ESSX I        - - - - - - -----**                  -* -----*---------*--
CtlEMISTRY        2101                          109    455-11500                                                    FROM SECURITY          2707                                  935-7300    OPS I EHG    3035                                                  TO:              TO:                1"0:
L.A.C.        109                CMI          32!15                                                SALEM OR            EOF                ESSX I DPS / ENG        2708    1121 l'&deg;'l 2709                                              CM2          35!15  7963                                        I/OPE CREEK CUI                              DEPO                                            359.J CMZ              2710    11111                                    ADMIN DEPO FAX      S02 131-1743                                                      FROM:
ADMIN            2711            DOVER        S02 &deg;'H5J1 731-!lll!ll                                                                    DIAL "4"          D/Al. "4 "            DIAL ADMIN ROOM        2712            KENT          .!02 8711-9111                                                                            THEN              THEN          FOUR DICITS NllC llOOM        271.!          NEW CASTLE    .!02 571-7941                                                      ESSX I        .. 429 * -x.rxx    "459    *-xxxx        EXT. XXXX PLEASE NOTE:                                                                                            ---------~------~-------*                                -
DCmtntfon Telephones operaie commercially from Are11 Corle 609.
ESSX I Te!ephontt opercdt commercicdly /rom Are11 Cod* 10 I.
NOAA - 24 Hr. Emergency Weather Service (2 t5) 597-0846 Del. Geological Survey (Earthquake Info) - (302) 45 t -2833
 
SECTION 5.0
* ARTIFICIAL ISLAND ANNUAL EXERCISE S93-03 SCENARIO OVERVIEW SECTION #      SECTION NAME                      PAGE #
5.1        Scenario Synopsis                  5.1.0 5.2        Scenario Timeline                  5.2.0 5.3        Major Observable Onsite Events      5.3.0 5.4        Onsite Actual vs. Simulated Events  5.4.0 5.5        Radiological Assumptions            5.5.0 5.6        Exercise Objectives (Confidential}  5.6.0 CAUTION:
* THIS SECTION IS FOR REFEREE/EVALUATOR REFERENCE ONLY !
SCENARIO INFORMATION AND DATA REQUIRED BY THE PLAYERS SHALL BE PROVIDED AND CONTROLLED FROM SECTIONS 6, 7, 8, 9 & 10 BY THE REFEREES *
* 5.0.0
* Section 5.1 ARTIFICIAL ISLAND ANNUAL EXERCISE 1993 SCENARIO SYNOPSIS INITIAL CONDITIONS FOR PLAYERS:
Hope Creek is at 100% power and has been for the last five months.
Salem Unit 1 expected to start-up this evening following maintenance on the Electro-Hydraulic System.
Salem Unit 2 has been at 100% power since the last refueling outage 90 days ago.
All major equipment is operable with the following notable exceptions:
21 SAFETY INJECTION PUMP is C/T'd and disassembled for pump impeller replacement; should be back on the swing shift tomorrow.
22 SERVICE WATER PUMP is C/T'd to replace the strainer with a new type. New strainer due on-site in two days .
* 21 AUXILIARY FEED PUMP is C/T'd to replace a motor bearing. Expect return on the mid shift tomorrow.
22 BORIC ACID TRANSFER PUMP is C/T'd to replace the motor. Work is progress, and should be returned to service by early swing shift today.
23 CHARGING PUMP is C/T'd for maintenance to inspect the cylinders for suspected piston leakage.
25 CONTAINMENT FAN COIL UNIT is C/T'd as of 0800 hours this morning.
Motor bearings are running hot. Maintenance expects to start work around 10 o'clock this morning.
2R1B CONTROL ROOM AREA MONITOR is failed low. Presently the Instruments and Controls group are trouble shooting.
Reactor Coolant Chemistry analysis indicates that several fuel pins are leaking. This has caused a minor increase in Reactor Coolant Activity. The leakage started one month ago and the Nuclear Fuels Group estimates approximately 0.01% clad defects currently. The leaking fuel pins are suspected to be manufacturing imperfections and new fuel assemblies will replace them when Salem Generating station Unit 2 shuts down for refueling .
* 5.1. 0
 
The exercise will begin at 08:00 with the Salem Control Room staff having just completed shift turnover and pre-staged in the Simulator Control room.
Scenario Synopsis:
Soon after the drill begins (08:05) all of the Control Room Annunciators will be lost due to a failure in the Annunciator 12 VDC power supply. Attempts by the operators to restore/reset the Annunciator will prove unsuccessful .
. At (08:10), Pressurizer level Channel 3, fails low. The Control Room staff will receive the following console alarms; Pressurizer level low, and flashing green backlights for the control and backup pressurizer heaters. When the control console is checked the Pressurizer Level channel 3 will indicate zero, and Letdown is lost. The operators* will not receive the expected overhead alarms associated with the channel failure.
The Pressurizer level channel failure will confirm to the operators the problem with the Annunciator system.
* Since the Operational Support center (OSC) is not yet activated, the Nuclear Shift Supervisor will page the Shift I&C Tech and have him investigate the failed level channel.
At 08:25 the Senior Nuclear Shift Supervisor should refer to Section 10 B. of the ECG and declare an Alert, LOSS OF MOST OR ALL ANNUNCIATION FOR GREATER THAN 15 MINUTES.
The problem with the overhead Annunciator System will not be repaired until the new initial conditions are presented during the recovery phase of the exercise.
As Emerqency coordinator (EC), the SNSS will initiate the required notifications and implement EPIPs to direct protective actions on-site as needed. Assembly of predesignated drill participants will occur at Salem Generating Station.
The SNSS (EC) will direct the Shift Support Supervisor to activate the operations support center (OSC).
At this time in addition to the osc and the Technical support center (TSC) activation, the Emerqency Operations Facility (EOF) and the Emerqency News center (ENC) will begin to staff with exercise responders.
s.1.1                                *
 
.Later, around an hour after the Alert classification (09:20), #21 Gas Decay Tank will develop a small leak.
Indications will be 2R-16 and 2R41C Plant Vent Radiation Monitor in warning, and eventually in alarm. #21 Gas Decay Tank pressure will also be decreasing as indicated on the 2RP1 panel in the control room.
The osc will be called upon to respond to the Auxiliary Building to investigate the problem with the gas decay tank.
2R-16 and 2R41C Plant Vent Radiation Monitors alarm at 09:25. The postulated cause will be the failure of a pressure tap (PT-1036) down stream of the root valve 21WG32. The OSC corrective action and repair team will stop the leak by closing root valve 21WG32 when the failure is identified (about 1 hour).
sometime later (10:30), the Control Room Staff will experience a plant transient, Main Feedline Failure at the discharge of the Steam Generator Feed Pumps (Turbine Building). Both Steam Generator Feed Pumps will trip on low suction pressure as they increase in speed to maintain the discharge header pressure. A security guard is severely burned due to the steam cloud which resulted from the Feedline break ..
During the performance of EOP-TRIP-1 (immediate actions) the Control Operator on the console observes the following; receipt of Reactor logic input on panel 2RP4 and the automatic trip did not bring the
* Reactor subcritical. The manual trip that was initiated did not bring the Reactor subcritical. Rapid boration is started in accordance with the procedure. The Operators will exit EOP-TRIP-1 and enter EOP-FRSM-1 *.
During this procedure, #23 Auxiliary Feed Pump trips, leaving only #22 Auxiliary Feed Pump to feed the Steam Generators.
Along with the Loss of Feedwater induced Anticipated Transient Without Trip, a Pressurizer Safety Valve fails to close during the initial Reactor Coolant system pressure surge. This causes Reactor Coolant pressure to decrease to approximately 1300 psig before safety valve reseats. This results in a loss of subcooling with the reactor at power, and the Limiting Safety System Setpoint for over-Temperature Delta-T is exceeded. During this transient departure from nucleate boiling occurs causing minor Fuel Clad Damage. Sometime later, the osc team will be successful in opening the Reactor Trip Breakers and taking the Rod Drive Motor-Generator sets out of service. The rods will drop into the core.
The SNSS should assess the present plant conditions and consider recommending to the Emerqency Duty Officer (EDO) the escalation of the emergency classification *
* 5.1.2
 
The decision to escalate the event is based on the loss of all of the
* overhead annunciators with a plant transient in progress, and the SNSS's judgement that safe operation of the plant is now hindered.
The Emergency Duty Officer (EDO), now the Emergency Coordinator (EC),
should refer to the ECG Section 10 and escalate the event to a Site Area Emergency. The decision to escalate is based on the information from the SNSS and also by the Technical Staff concurrence.
At 10:45, SITE AREA EMERGENCY declared per ECG Section 10 C; LOSS OF MOST OR ALL ANNUNCIATORS WITH A PLANT TRANSIENT INITIATED/IN PROGRESS.
At 11:20, #23 Auxiliary Feed Pump trip valve is reset, and the pump automatically starts, supplying feedwater to all four Steam Generators.
Ten minutes later at 11:30, #22 Auxiliary Feed Pump will trip, leaving only #23 Auxiliary Feed Pump to supply the steam generators.
With the.trip of #22 Auxiliary Feed Pump the  osc will be directed to dispatch a team to investigate the problem.
At 12:00, the steam driven Auxiliary Feed Pump (#23) will fail. Steam Generator levels begin to decrease and the OSC will dispatch an NEO to attempt to reset the pump. The Auxiliary Feed Pump cannot b.e reset.
This results in a total loss of Main and Auxiliary Feed which will
* maintain the Site Area Emergency classification per ECG section 4B and later. result in a General Emergency.
The osc team in the field will report back that it will take at least an hour to diagnose the problem with #23 Auxiliary Feed Pump. The steam generator levels have reached their Low-Low Levels on the narrow range and continue to trend down. The NSS has ordered a manual trip be initiated and EOP-TRIP-1 will be implemented.
With the transient initiated by the loss of feed, followed by failure of Auxiliary Feed Water for an extended period, it cannot be restored in the 30 minute time frame. The SNSS should refer to ECG Section 4 and notify the EDO that escalation to a General Emergency is recommended.
By 12:45, the EDO should notify the Emergency Response Manager (ERM) now the Emergency Coordinator. The ERM should refer to ECG Section 4 and escalate the event to a General Emergency.
GENERAL EMERGENCY declared per ECG initiating condition 4 c; TRANSIENT INITIATED BY LOSS OF FEED AND COND. FOLLOWED BY FAILURE OF AUX FEED FOR EXTENDED PERIOD. (CORE DAMAGE POSSIBLE IN SEVERAL HOURS).
5.1.3                                *
* The control Room Staff has completed their* EOPs for the manual trip and have entered EOP-FRHS-1 while awaiting the return of the Auxili~ry Feed Water System.
The steam generator levels (Wide Range) are decreasing, and the operating staff is reviewing the procedures for the possibility of feeding and bleeding the RCS in the event three Wide Range Steam Generator levels are less than 24%.
With the loss of all feed the SNSS may have the OSC check on the status of #21 Auxiliary Feed Pump, and wh~t can be done on the feed line break in the Turbine Building to possibly allow the use of the condensate pumps to fill the steam generators.
By 13:15, #23 Auxiliary Feed Pump is restored to service and the steam generators can be filled.
After the ERM has discussed with the EOF staff the improved plant conditions, the Facility Lead Referees will move the scenario clock ahead 30 hours and provide a briefing on the new plant conditions.
After this briefing the ERM/EDO should begin a discussion on Recovery Planning in accordance with EPIP-405.
At 13:45, the simulator will be frozen and reset to a new time to allow the Emergency Coordinator (EC), to demonstrate Emergency Termination/
Reduction/Recovery planning actions in accordance with EPIP-405. The
* objective is to begin recovery planning actions.
The Control Room staff will be given new Initial Conditions: The Reactor is in Mode 5, on normal Residual Heat Removal lineup with Steam Generator levels normal, and all Auxiliary Feed Pumps available for service. The overhead Annunciators have been restored.
At 14:15 (20:15 The Next Day), the time has been accelerated and Recovery Planning may commence. It is anticipated that the Recovery Planning will take approximately an hour.
After a demonstration of Planning for Recovery Operations, the EOF Lead Referee may determine that existing conditions support termination of the exercise. With the concurrence of the Head Referee and NRC evaluators the scenario will cease.
A critique of the Exercise will commence at each facility with all players and referee's participating immediately after or during restoration of the ERF's to a ready status .
* 5.1.4
 
FUEL FAILURE MECHANISM; 593-03 The Salem Updated Final Safety Analysis Review includes a Condition II Event titled " Accidental Depressurization of the Reactor Coolant System." This event is postulated based on the failure of a Pressurizer Safety valve open. By definition, Condition II Faults (Faults of Moderate Frequency) will at worst result in a reactor shutdown (trip) with the plant being capable of returning to operation. These faults do not propagate to cause a more serious fault, i.e.
condition III or IV category. In addition, Condition II events are not expected to result in fuel rod failures.
An evaluation of the reliability of the Reactor Protection System (RPS) actuation has been performed in the UFSAR and it has been determined that based on the high reliability of the RPS, no special provisions are proposed to cope with the consequences of Condition II events without a trip. For the purpose of the Emergency Preparedness Drill, we have incorporated several common-mode failures resulting in a failure of not only the reactor trip breakers, but also of the Rod Control System and breaker 2E6D (MG Set Feeder Breaker). This enables a prolonged violation of several Limiting Safety system Setpoints (LSSS).
This combination of failures places the plant in a beyond design basis configuration. As noted in UFSAR Chapter 15.5,
* the Anticipated Transient Without Scram (ATWS) is alone considered outside design basis. The combination of the Condition II event (Pressurizer Safety Valve sticks open) and the ATWS result in being at power with no Reactor Coolant Subcooling Margin.
This condition (decreasing Reactor Coolant System pressure) with continued core power generation will cause, among other RPS trip signals, an Overtemperature Differential Temperature trip signal to be generated. The basis for the overtemperature Delta Temperature Reactor Trip is to protect the fuel from exceeding the Westinghouse Departure from Nucleate Boiling Ratio (DNBR) of 1.3. While exceeding this trip setpoint without a Reactor Trip does not ensure fuel damage, it is reasonable to assume that continued power operation while exceeding the LSSS could result in fuel damage.
FUEL FAILURE
 
==SUMMARY==
; S93-03 For the purposes of the drill, the mechanism for Reactor core fuel damage will be exceeding the overtemperature Differential Temperature Limiting Safety System setpoint during an Anticipated Transient Without Scram.
5.1.5
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MAJOR EVENTS TIMELINE DRILL NUMBER: S93-03 REAL        DRILL TIME        TIME      MESSAGE                      EVENT                              RECEIVER                    EXPECTED ACTION
============ ============ ============ ========================================= ============================= ============================================
  . 07:00      -01:00      01          INITIAL CONDITIONS BRIEFING.            SALEM SHIFT PERSONNEL      1. LEAD REFEREE IN THE SIMULATOR YILL HOLD AN INITIAL CONDITIONS BRIEFING FOR CONTROL ROOM STAFF & COMMUNICA-TORS IN PARALLEL YITH THIS BRIEFING.
: 2. ENSURE KEY PLAYERS AND REFEREES ARE AVAILABLE TO START THE DRILL.
: 3. ENSURE CONTROL ROOM CONTROLLER IS AVAILABLE TO SUPPORT DRILL COORDINA-TION YITH THE DUTY SHIFT.
07:50      -00:10      02          INITIAL PAGE ANNOUNCEMENT.                SNSS (SALEM & HOPE CREEK)  REFEREE NOTES (CONT'D)
: 4. ENSURE THAT SALEM DUTY SNSS IS AYARE THAT AN ACTUAL PASS SAMPLE MAY BE TAKEN DURING THE DRILL.
: 5. HEAD REFEREE, ENSURE THAT THE SALEM CR CONTROLLER IS IN PLACE TO COORDI-NATE SIMULATOR/CR INTERFACE, STATION PA ANNOUNCEMENTS, ETC.
08:05      00:05      03          ANNUNCIATOR FAILURE.                      CONTROL ROOM STAFF          1. OPERATORS TO IMPLEMENT S2.0P-AB.ANN-0001(Q).
: 2. ATTEMPT TO RESET THE OHA SYSTEM IN ACCORDANCE YITH S2.0P-SO.ANN-0001(Q).
YILL BE UNSUCCESSFUL.
: 3. SNSS/NSS TO EVALUATE PLANT CONDITIONS
: 4. REFER TO THE EVENT CLASSIFICATION GUIDE.
08:10      00:10      04        ATTEMPTS TO RESET ANNUNCIATORS ARE        CONTROL ROOM STAFF          1. OPERATIONS STAFF TO IMPLEMENT THE UNSUCCESSFUL.                                                            NECESSARY PROCEDURES TO RESET THE 5.2.0
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MAJOR EVENTS TIMELINE DRILL NUMBER: S93-03 REAL        DRILL TIME        TIME      MESSAGE                    EVENT                              RECEIVER                      EXPECTED ACTION
============ ============ ============ ========================================= ============================= ============================================
OVERHEAD ANNUNCIATORS.
: 2. RESTORATION YILL BE UNSUCCESSFUL AND THE SNSS/NSS YILL BE NOTIFIED.
08:10        00:10      05D        PRESSURIZER LEVEL CHANNEL 3 FAILS LOY. CONTROL ROOM STAFF          1. OPERATORS TO IMPLEMENT CORRECTIVE ACTION FOR LOSS OF INSTRUMENTATION.
: 2. SYAP TO OTHER CHANNEL ON THE CONTROL CONSOLE.
: 3. RE-ENERGIZE THE PRESSURIZER HEATERS RE-ESTABLISH LETDOWN.
: 4. CONTACT THE SHIFT l&C TECHNICIAN TO INVESTIGATE THE PROBLEM AND TRIP THE APPLICABLE BISTABLE.
: 5. NO ALARMS RECEIVED ON THE OVERHEAD YHEN THE CHANNEL FAILED.
: 6. SNSS/NSS REVIEY THE ECG.
08:30        00:30      06C        CONTINGENCY TO DELCARE AN ALERT.        SNSS                        1. SNSS SHOULD REFER TO ECG SECTION 10B AND DECLARE AN ALERT.
: 2. IMPLEMENT ECG ATTACHMENT 2 AND EPIP 102S.
: 3. DIRECT  DESIGNATED COMMUNICATORS TO MAKE THE NOTIFICATIONS.
: 4. DIRECRT THE SSS TO ACTIVATE TlfE OSC.
09:20        01:20      07R        2R-16 AND 2R41C PLANT VENT EFFLUENT      CONTROL ROOM STAFF          1. IF/YHEN THE PROBLEM YITH THE GAS DE-RADIATION MONITORS IN WARNING #21 GAS                                    CAY TANK IS IDENTIFIED, THE CONTROL DECAY TANK LEAK.                                                        ROOM STAFF YILL MONITOR THE GAS DECAY TANK PRESSURES.
: 2. CONTROL ROOM STAFF TO IMPLEMENT S2.
OP-AB.RAD-0001(Q), ATTACHMENT 1.
5.2.1
 
  *REAL        DRILL ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MAJOR EVENTS TIMELINE DRILL NUMBER: S93-03 TIME        TIME      MESSAGE                      EVENT                              RECEIVER                    EXPECTED ACT ION
============ ============ ============ ========================================= ============================= ============================================
: 3. ANNOUNCE OVER THE PLANT PAGE THE AFFECTED RADIATION MONITOR NAME AND NUMBER.
09:25        01:25      OBR        2R-16 AND 2R41C PLANT VENT IN ALARM.      CONTROL ROOM STAFF          1. SNSS TO DIRECT THE OSCC TO SEND OUT A CORRECTIVE ACTION AND REPAIR TEAM TO INVESTIGATE THE PROBLEM.
: 2. SINCE THIS IS A VALID RADIATION ALARM THE OSC RAD PRO SUPERVISOR SHOULD EN-SURE THAT ALL CONCERNED PARTIES ARE MADE A~ARE OF THE CHANGING CONDITIONS
: 3. ONCE THE TEAM IS THOROUGHLY BRIEFED THEY ~ILL BE DISPATCHED.
09:40        01:40      09C        CONTINGENCY TO DISPATCH AN OSC TEAM TO    SNSS                        1. OSC NOTIFIED, TEAM BRIEFED ON THE 21 GAS DECAY TANK.                                                      ACTIVITY AND DISPATCHED.
: 2. SNSS/EDO MAY DIRECT IMPLEMENTATION OF ACCOUNTABILITY.
10:00        02:00      10          GAS DECAY TANK LEAK IDENTIFIED.          OSC TEAM LEADER            1. EXPECT THE OSC TEAM TO CHECK ALL THE TANKS AND PRESSURE SENSING LINES IN AN EFFORT TO IDENTIFY AND STOP THE GAS LEAK INTO THE AUXILIARY BUILDING.
10:00        02:00      11          PRESSURIZER LEVEL CHANNEL WILL NOT BE    SHIFT TECHNICIAN            1. SHIFT TECHNICIAN COMPLETES ALL RESTORED.                                                                TROUBLESHOOTING AND NOTIFIES THE CON-TROL ROOM.
10:00        02:00      12R        2R16 PLANT VENT MONITOR STATUS CHANGE    CONTROL ROOM STAFF          1. OPERATIONS STAFF TO REVIE~ THE RES-FROM ALARM TO WARNING. RELEASE RATE                                      PONSE FOR THE RADIATION ALARM.
DECREASING.
5.2.2
                                                                                                                                  --~------------
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MAJOR EVENTS TIMELINE DRILL NUMBER: S93-03 REAL        DRILL TIME        TIME      MESSAGE                    EVENT                              RECEIVER                      EXPECTED ACTION
============ ============ ============ ========================================= ============================= ============================================
10:15        02:15      13C        GAS DECAY TANK LEAK ISOLATED.            OSC TEAM LEADER            1. OSC TEAM MEMBER TO CLOSE ROOT VALVE.
: 2. OSC TEAM LEADER TO NOTIFY THE OSC COORDINATOR THAT THE LEAK HAS BEEN STOPPED.
10:15        02:15      14C        LEAK ISOLATED RAD RATE DECREASING.        CONTROL ROOM STAFF          1. SRPT TO NOTIFY THE SNNS/SNSS OF THE DECREASING RADIATION RELEASE RATE.
10:30        02:30      15D        LOW SUCTION PRESSURE AND TRIP OF BOTH    CONTROL ROOM STAFF          1. OPERATORS TO INITIATE A MANUAL REACT-STEAM GENERATOR FEED PUMPS.                                              OR/ TURBINE TRIP.
: 2. CONTROL ROOM STAFF TO IMPLEMENT EOP-TRIP-1, REACTOR TRIP OR SAFETY INJEC-TION.
10:31        02:31      160        ATWT, ALL CONTROL/SHUTDOWN ROOS OUT.      CONTROL ROOM STAFF          1. MANUAL REACTOR TRIP INITIATED.
: 2. CONTROL ROOM STAFF IMPLEMENT EOP-TRIP-1
: 3. COMMENCE RAPID BORATION.
: 4. EXIT EOP-TRIP-1 AND ENTER EOP-fRSM-1.
10:31        02:31                  PRESSURIZER SAFETY VALVE FAILS TO        CONTROL ROOM STAFF          1. CONTROL ROOM STAFF CHECKS THE CONSOLE RESEAT.                                                                  IN ORDER TO IDENTIFY THE LOW PRESSURE PROBLEM.
: 2. TAIL PIPE TEMPERATURES SLIGHTLY ELEV-ATED AND ALARM RECEIVED ON THE PRESS-URIZER RELIEF TANK.
: 3. SNSS WILL ASSESS PLANT CONDITIONS AND CONSIDER RECOMMENDING ESCALATION OF THE EMERGENCY CLASSIFICATION TO THE EDO.
5.2.3
* REAL        DRILL ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MAJOR EVENTS TIMELINE DRILL NUMBER: S93-03 TIME        TIME      MESSAGE                      EVENT                              RECEIVER                  EXPECTED ACTION
============ ============ ============ ========================================= ============================= ============================================
10:33        02:33      180          23 AUXILIARY FEED PUMP FAILS.            CONTROL ROOM STAFF        1. DIRECT THE OSC TO INVESTIGATE TRIP OF
                                                                                                                  #23 AUXILIARY FEED PUMP.
10:38        02:38      19          DISCOVERY OF INJURED PERSON.              SNSS                      1. SNSS DIRECTS THE OSC TO INITIATE A SEARCH AND RESCUE TEAM.
10:45        02:45      20D          REACTOR TRIP AND MG SET BREAKERS OPEN. CONTROL ROOM STAFF        1. VERIFY THE REACTOR TRIP BREAKERS AND MG SET BREAKERS ARE OPEN.
: 2. ACKNOWLEDGE THE CONSOLE ALARMS FOR THE REACTOR TRIP AND MG SET BREAKERS.
: 3. CONTINUE WITH PROCEDURE IN EFFECT.
10:45        02:45      21C          CONTINGENCY TO DISPATCH AN OSC TEAM TO    SNSS                      1. OSC NOTIFIED, TEAM BRIEFED ON THE 23 AUXILIARY FEED PUMP.                                                ACTIVITY AND DISPATCHED.
10:55        02:55      22C          CONTINGENCY TO DECLARE A.SITE AREA        EDO I SNSS                1. DECLARE A.SITE AREA EMERGENCY.
EMERGENCY.                                                          2. IMPLEMENT ECG ATTACHMENT 3.
: 3. IMPLEMENT EPIP 103S.
: 4. IMPLEMENT LIMITED ACCOUNTABILITY IF NOT ALREADY DONE.
11:00        03:00      23R          VARICXJS PLANT RADIATION MONITORS GO      CONTROL ROOM STAFF        1. OPERATIONS STAFF TO REVIEW THE RES-INTO ALARM
* PONSE FOR THE RADIATION ALARMS.
11:00-11:15 03:00-03:15  24C        . CONTINGENCY TO IMPLEMENT IOP-8, MAIN-    SNSS I NSSS                1. SNSS I NSS TO CONTINUE WITH IOP-8 AND TAINING HOT STANDBY.                                                    MAINTAIN HOT STANDBY UNTIL ALL STEAM GENERATOR LEVELS ARE RETURNED TO THE NORMAL OPERATING RANGE.
11:10        03:10                    CONTINGENCY TO ENSURE THAT A PASS        RAC                        1. RAC WILL INFORM THE EDO OF THE NEED 5.2.4
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MAJOR EVENTS TIMELINE DRILL NUMBER: S93-03 REAL        DRILL TIME        TIME
* MESSAGE                    EVENT                              RECEIVER                      EXPECTED ACTION
============ ============ ============ ========================================= ============================= ============================================
SAMPLE IS ACTUALLY PERFORMED FOR                                        TO OBTAIN A PASS SAMPLE, FOR SCENARIO DEMONSTRATION OF OBJECTIVES.                                            CONTROL.
: 2. RAC MILL DIRECT THE CHEMISTRY SUPER-VISOR TO INITATE AN ACTUAL PASS SAMPLE.
11:20        03:20        25D        23 AUXILIARY FEED PUMP READY FOR        CONTROL ROOM STAFF          1. MONITOR AUXILIARY FEED  ~ATER PUMP SERVICE.                                                                START.
11:30        03:30        260        #22 AUXILIARY FEED PUMP TRIPS.          CONTROL ROOM STAFF          1. SNSS TO DIRECT OSCC TO SEND OUT A CORRECTIVE ACTION AND REPAIR TEAM TO INVESTIGATE THE PROBLEM.
: 2. OSC TO BRIEF TEAM AND THEN DISPATCH TO 22 AUXILIARY FEED PUMP.
11:40        03:40        27C        CONTINGENCY TO INVESTIGATE 22 AUXILIARY SNSS                          1. OSC NOTIFIED, TEAM BRIEFED ON THE FEED PUMP.                                                              ACTIVITY AND DISPATCHED.
11:55        03:55        28        REPORT OF DAMAGE TO 22 AUXILIARY FEED    OSC TEAM LEADER              1. THE TEAM LEADER TO REPORT HIS FIND' PUMP.                                                                    INGS TO THE OSC.
: 2. OSC COORDINATOR TO NOTIFY THE SNSS/
NSS OF THE PROBLEM AND DAMAGE.
12:00        04:00        290        23 AUXILIARY FEED PUMP FAILS.            CONTROL ROOM STAFF          1. STEAM GENERATOR LEVELS BEGIN TO DE-CREASE.
: 2. THE- -NSS SHOULD DIRECT A MANUAL TRIP AND ENTRY INTO THE EOP NETYORK.
: 3. DIRECT OSC TO INVESTIGATE TRIP OF 23 AUXILIARY FEED PUMP.
12:02        04:02        30D        ALL STEAM GENERATORS APPROACHING LOY-    CONTROL ROOM STAFF          1. NSS HAS ORDERED A MANUAL REACTOR TRIP 5.2.5
 
  *REAL TIME DRILL ARTIFICIAL ISLAND EMERG~REPAREDNESS MAJOR EVENTS TIMELINE DRILL NUMBER: S93-03 TIME      MESSAGE                      EVENT                            RECEIVER                      EXPECTED ACTION
============ ============ ============ ========================================= ============================= ============================================
LO\.J NARROW RANGE LEVELS.                                                INITATED.
: 2. IMPLEMENT EOP-TRIP-1.
: 3. NOTIFY THE EDO OF THE ESCALATING FEED WATER PROBLEMS.
12:15        04:15      31C        CONTINGENCY FOR THE OSC TO DISPATCH A      SNSS                      1. OSC NOTIFIED, TEAM BRIEFED ON THE TEAM TO 23 AUXILIARY FEED PUMP.                                          ACTIVITY AND DISPATCHED.
12:25        04:25      32          REPORT BY THE OSC TEAMS ON THE STATUS      OSC TEAM LEADER            1. WITH THE TRANSIENT INITIATED BY THE OF THE AUXILIARY FEED PUMPS.                                              LOSS OF FEED, FOLLOWED BY FAILURE OF AUX. FEED FOR AN EXTENDED PERIOD, IT CAN* NOT BE RESTORED IN THE 30 MINUTE TIME FRAME. SNSS SHOULD REFER TO THE ECG AND RECOMMEND ESCALATION OF THE EVENT TO THE EDO.
12:45        04:45      33C        CONTINGENCY TO DECLARE A GENERAL          SNSS I EDO I ERM          1. DECLARE A GENERAL EMERGENCY.
EMERGENCY.                                                            2. IMPLEMENT ATTACHMENT 4.
: 3. IMPLEMENT EPIP 104SCEPIP 401. APP. B)
: 4. PREDETERMINED PAR SELECTION.
MINIMUM EXPECTED PAR SECTORS            DISTANCE(MILES)
SHELTER ALL SECTORS                0 - 2 SHELTER DOWNWIND +/-    SECTOR    2 - 5 13:05        05:05      34          23 AUXILIARY FEED PUMP STATUS.            OSC TEAM LEADER            1. OSC. TEAM TO CHECK PUMP AND GOVERNOR
                                                                                                                  .CONTROLS.
: 2. NOTIFY THE OSC THAT THE PUMP WILL BE RETURNED TO SERVICE IN A SHORT PERIOD OF TIME.
: 3. 23 AUX. FEED PUMP OVERSPEED RESET AND 5.2.6
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MAJOR EVENTS TIMELINE DRILL NUMBER: S93-03 REAL        DRILL TIME        TIME      MESSAGE                      EVENT                              RECEIVER                    EXPECTED ACT ION
============ ============ ============ ========================================= ============================= ============================================
PUMP STARTED.
13:15        05:15      35D        23 AUXILIARY FEED PUMP IN SERVICE.        CONTROL ROOM STAFF          1. MONITOR AUXILIARY FEED IJATER PUMP START.
: 2. STEAM GENERATOR LEVELS BEGIN TO IN-CREASE.
13:40        05:40      36          STATUS REPORT ON 22 AUXILIARY FEED PUMP OSC TEAM LEADER              1. TEAM LEADER TO NOTIFY THE OSC OF THE IMMINEMT RETURN OF THE 22 AUXILIARY FEED PUMP (WHEN TAGS ARE REMOVED).
: 2. DSC TO NOTIFY THE SNSS OF THE PRO-GRESS ON THE FEED PUMP.
13:45        05:45      37          TIME ACCELERATED THIRTY (30) HOURS.      CR, OSC, TSC, EOF PLAYERS  1. ALL DRILL PLAYERS IJILL BE GIVEN NEIJ INITIAL CONDITIONS FOR REVIEIJ.
: 2. ALL DRILL PARTICIPANTS TO REVIEIJ NEIJ DATA WHICH WILL BE RECEIVED AT 14:15 HOURS.
: 3. DISCUSSIONS ON METHODS OF RECOVERY.TO COMMENCE.
14:00        20:00      38          STATE DRILL PARTICIPANT MESSAGES.        STATE DRILL PARTICIPANTS    1. STATE DIRECTOR TO DISCUSS EMERGENCY STATUS WITH ERM AND INFORM ERM THAT HE IS UNDER PRESSURE TO ALLOIJ CITI-ZENS TO RETURN HOME BUT IS IJAITING FOR. PSE&G TO INFORM THEM THAT CONDI-TIONS HAVE IMPROVED TO A POINT THAT PSE&G IS CONSIDERING RECOVERY.
14: 15      20:15      39          NEW SET OF INITIAL CONDITIONS.            CR, DSC, TSC, EOF PLAYERS  1. AFTER SOME DISCUSSION BY THE ERM IJITH EOF STAFF, AND IJITH THE PLANT STAB-5.2.7
 
  *REAL TIME DRILL MESSAGE ARTIFICIAL ISLAND EMERG~REPAREDNESS MAJOR EVENTS TIMELINE DRILL NUMBER: S93-03 TIME                                  EVENT                            RECEIVER                      EXPECTED ACTION
============ ============ ============ ========================================= ============================= ============================================
ILIZED THE RECOVERY DETERMINATION CAN COMMENCE.
15:30        21:30      40          DRILL PAGE TERMINATION ANNOUNCEMENT. DUTY SNSS (SALEM & HOPE CREEK). AFTER THE SNSS AND EDO AGREE THAT THE PLANT IS STABLE, HEAD REFEREE YILL TERMINATE DRILL YITH NRC CON-CURRENCE.
: 2. LEAD REFEREES SHALL ENSURE THEIR FACILITY IS RESTORED TO NORMAL READY CONDIT IONS.
: 3. NCO AT SALEM AND HOPE CREEK MAKES PAGE ANNOUNCEMENT.
15:45        OVER        41          REFEREES TO REVIEY THE DRILL SYNOPSIS    LEAD REFEREES                1. REVIEY THE EXERCISE AND COMMENCE YITH PLAYERS.                                                            CRITIQUE.
5.2.8
 
SECTION 5.3 ARTIFICIAL ISLAND ANNUAL EXERCISE 1993 MAJOR OBSERVABLE ONSITE EVENTS Note: All references to CR Response are actions observable in the Salem simulator at the Nuclear Training Center.
REAL TIMES
{APPROX.)        MAJOR OBSERVABLE EVENTS - ONSITE 07:00        Shift personnel pre-drill briefing and review thru        of initial conditions.
08:00        Review of player instructions {drillsmanship and safety concerns)
* Posting of initial conditions displays in the Simulator and other ERFs as appropriate.
Referees posted at key locations to control players activities and responses to early events 08:00        Drill begins.
thru        CR response to loss of overhead Annunciators and 09:20        Pressurizer Level channel 3 failure.
ALERT declaration and notifications from the Salem Simulator.
Emergency Response personnel callout and activation of onsite ERFs. {OSC,TSC,CR and CP}
EOF and ENC begin staffing and facility set up.
ERF's access control is established.
09:20        CR and osc response to 21 Gas Decay Tank leak in thru        the Auxiliary Building.
10:45        CR and osc response to the Anticipated Transient Without Trip, loss of Main Feed Water, and stuck open Pressurizer Safety Valve.
Emergency Coordinator {EC} turnover from SNSS to EDO, TSC activated.
SITE AREA EMERGENCY declaration and notifications from the TSC.
Limited Accountability demonstrated onsite for drill participants at Salem only. {No evacuation or relocation of non-drill personnel)
PASS sample requested RAC.
S.3.0
 
MAJOR OBSERVABLE ONSITE EVENTS (continued)
* 10:45 thru 12:00 CR and OSC response to loss of operating Auxiliary Feed Pump.
CR and OSC response to loss of Steam Driven Auxiliary Feed Pump.
EC turnover from the EDO to the ERM and EOF activation.
ENC activation with periodic press releases and media briefings.
12:00    OSC team responses to the loss of all Auxiliary thru      Feed Pumps.
13:15  -- Manual Trip initiated to allow entry into EOP network, in response to the Low-Low Levels in the Steam Generators.
GENERAL EMERGENCY declaration, PAR selection, and notifications from the EOF.
Onsite and Offsite field monitoring teams are dispatched if not done already.
13:15    osc team repair of one Auxiliary Feed Pump and thru      CR response.
13:45    Emergency Coordinator and Staff evaluate the plant and radiological parameters to determine if the conditions have stabilized.
Discussion by the ERM (EC), on Recovery Planning in accordance with the EPIP.
13:45    The Simulator will be frozen and reset to a new thru      time to allow the demonstration of Emergency 14:15    Termination/Reduction/Recovery actions in accordance with EPIP.
The time acceleration will be six (6) hours, and the new time will be 20:15 hours.
* Control Room and all facilities will be given a new set of initial conditions.
14:15    Demonstration of Recovery actions, it is thru      anticipated that the Recovery will last 15:30    approximately one (1) hour.
Head Referee will terminate the exercise with concurrence of the NRC evaluators when the objectives have been satisfied.
15:30    ERFs are restored to pre-exercise conditions.
thru      Facility critiques for players and referees.
16:00    Field monitoring teams return to the ERFs for debriefing and critique .
* S.3.1
 
SECTION 5.4 ARTIFICIAL ISLAND ANNUAL EXERCISE 1993 ONSITE ACTUAL VS. SIMULATED EVENTS              *
: 1. Callout of Emergency Response Personnel    Actual(Pagers, Plant Page and Manual Callout
: 2. Activation of ERFs                        Actual
: 3. PASS Sampling and Analysis                *Actual
: 4. Emergency Notification                    Actual
: 5. Radiation Protection Measures            *Actual(Offsite Monitors will not wear PCs)
: 6. Personnel Monitoring                      Actual
: 7. Inplant, Onsite, and Offsite Monitoring    Actual 8.
9.
Accountability Access Control {TSC, EOF, & ENC)
Actual(Limited to drill play-ers only)
Actual
: 10. Core Damage Estimation                    Actual
*NOTE:
Demonstrating proficiency in donning SCBAs need only be performed once. After initial demonstration, the players will not wear facepieces while in the field.
5.4.0
 
SECTION 5.5 ARTIFICIAL ISLAND GRADED EXERCISE (693-03)
RADIOLOGICAL ASSUMPTIONS/CALCULATIONS
* Public service Electric and Gas designed a radiological transport program
  .. for SGS to be used in developing scenarios for emergency drills. The calculations and tables of specific information used by this program can be found in the PSE&G SGS Emergency Preparedness Software - Module A Technical Basis Manual (SGSEPTBM). The radiological assumptions used by this program are as follows:
5.5.1.1 Reactor Core and Clad Failure Inventory*
The design basis core inventory was taken from the Salem Core damage Assessment Guideline and is listed in Table 1-3 of the SGSEPTBM. The Clad Failure Factors are displayed in Tab~e 1-2 of the SGSEPTBM.
5.5.1.2 Reactor Coolant System (RCS) 5.5.1.2.a Power Correction Factor The Power Correction Factor uses the power operation history to determine the effective full power days on the reactor core. A correction factor for each isotope which is used in calculating the actual core inventory available for release is produced by this calculation. See Section 3.1.1 of the SGSEPTBM for the calculations.
5.5.1.2.b RCS Inventory The RCS Inventory is calculated based on the power operating history, the fuel damage postulated, the reactor core inventory, and then are decayed corrected for the time since reactor trip. See section 3.1.2 of the
* SGSEPTBM for the calculations .
5.5.1.2.c RCS Concentration The RCS Concentration is converted to uci and volume corrected for temperature and pressure, and then combined to yield RCS concentration for the fuel damage postulated. See Section
* 3 . 1. 3 of the SGSEPTBM for the . .
calculations.
5.5.1.3 Containment sump containment sump isotopic activities are calculated based on Reactor coolant Activities and t~e Sump Volume. The Sump Volume is calculated by combining the initial input by the user with current plant conditions such as Primary Leak Rate and various liquid flow rates. Calculations for the containment sump can be found in section 3.2 of the SGSEPTBM.
5.5.1.4 containment Atmosphere - Normal (C/A-N)
RCS leakage is partitioned to the atmosphere using Standard Liquid to Atmosphere Partition Factors. The C/A-N is corrected for temperature and pressure. The source term used in this calculation uses the RCS leak rate.
The calculations and partition factors are in Section 3.3.1 and Tables 1-5, l-5A, 1-6, 1-7, and 1-8 of the SGSEPTBM.
5.5.1.5 Auxiliary Building Atmosphere - Normal (ABA-N)
The Containment Building Atmosphere leakage into the Auxiliary Building is based on a leakage of components in the Auxiliary Building IAW FSAR Section 11.3.6. The source term calculation utilizes the Containment Atmosphere, Reactor Coolant System, and Containment Atmosphere. Containment Atmosphere is based on containment pressure IAW FSAR Section 6.2.1.1. These calculations are in Section 3.4.1 of the SGSEPTBM.
5.5.0
 
5.5.1.6 Radiation Monitoring System (RMS) 5.5.1.6.a Area Radiation Monitors The ARMs use both atmosphere concentrations and component radiation shine as the source terms for the monitor response calculations. Monitor response factors and shield factors are calculated values using isotopic mi~*
source location, source size , source geometry, and monitor response to combined sources. The data and parameters used in the calculations come from the Salem FSAR Chapter 15, the Salem RMS Manual, and the most current floor plans and equipment layout drawings of Salem. See Section 3.8 of the SGSEPTBM for the calculations.
5.5.1.6.b Effluent Monitors The Effluent Monitors utilize effluent steam concentrations, component radiation shine, and atmosphere radiation shine for the monitor response calculations. Monitor response factors and shield factors are calculated values which use isotopic mix, source location, source size, source geometry, effluent stream activity, and monitor response to combined sources. The data and parameters used in the calculations are from chapter 15 of the Salem FSAR, the Salem RMS Manual, and the most current floor plans and equipment layout drawings of Salem. -See Sections 3.8. of the SGSEPTBM for the calculations.
5.5.1.6.c Process Monitors The Process Monitors use system concentrations, component radiation shine, and atmosphere radiation shine for the monitor response calculations.
Monitor response factors and shield factors are calculated values which use isotopic mix, source location, source size, source geometry, system stream activity, and monitor response to combined sources. The data and parameters used in the calculations come from Chapter 15 of the Salem FSAR, The Salem RMS Manual, and the most current floor plans and equipment layout drawings of Salem. See Section 3.8 of the SGSEPTBM for the calculations.
5.5.1.7 Sample and Dose Rate Calculations The Sample and Dose rate calculations use the system effluent stream and/or atmosphere concentrations as the source term. The sample geometry, distance, counting instrument, and isotopic mix are the parameters used in developing the shield factors. See Section 3.7 of the SGSEPTBM for the calculations.
5.5.1.8 S/G Liquid  Volume The Steam Generator  (S/G) liquid volume utilizes the S/G level entered by the user  to calculate the volume of liquid in the S/G in cc. The calculations are in  Section 3.6.1 of the SGSEPTBM.
5.5.1.9 S/G steam Volume The S/G steam volume utilizes the S/G level entered by the user to calculate the volume of steam in the S/G in cc. The calculations are in Section 3o6.2 of the SGSEPTBM.
5.5.1.10 S/GTRS The S/GTRS ut~lizes the Methodology found in the Salem FSAR for determining the S/G Steam concentrations followi~g a Tube Rupture. The calculations are in Section 3.6.6 of the SGSEPTBM.
5.5.1.11 Plume Data The Emergency Preparedness Scenario Generator (EPSG) - Module B Plume Program, is designed to generate offsite dose assessment scenario data for SGS. The software utilizes an A+ atmospheric dispersion model in all X/Q
* calculations. Dose assessment calculations are performed utilizing the information and data from the SGS EPSG - Module A, Version 3.1 (11/89). The guidance and equations utilized in the software come from the following references:
5.5.1
 
U.S. Nuclear Regulatory Commission, Reg. Guide 1.145 (2/83) "Atmospheric Dispersion Module for Potential Accident consequence Assessments at Nuclear Power Plants" .
D. Bruce Turner, "Workbook for Atmospheric Dispersion Estimates",
Environmental Protection Agency, Office of Air Programs Research, Triangle Park, N.C. Rev. 1970.
NUREG/CR-3365 "Report to the NRC on Guidance for Preparing Scenarios for Emergency Preparedness Exercises at Nuclear Generating stations; March 1986.
5.5.2 Specific Radiological Assumptions for Artificial Island Graded Exercise (S93-03) as follows:
5.5.2.1 Reactor Coolant system (RCS) Leakage into the Containment Building and Design Basis Leakage (DBL) From the Containment Building into the Auxiliary Building is as follows:
The RCS Leak Rate into the Containment Building for the entire Graded Exercise is assumed to be 0.10 gpm. The containment Atmosphere Concentrations increases when fuel damage occurs due to this RCS leakage.
DBL from the Containment Building into the Auxiliary Building is assumed to be at a rate of 0.1% of the containment Free Volume. The Containment free volume is 2.6 million cubic feet. The Auxiliary Atmosphere Concentrations increases when fuel damage occurs due to this DBL.
5.5.2.2 Dose Equivalent Iodine (DEI)
The RCS DEI is presented in the data as uCi/cc. This is equivalent to uci/g without the use of conversion factors
* 5.5.2.3 Reactor Trip The Plant experiences a transient, Main Feedline Failure (Turbine Building),
causing both Steam Generator Feed Pumps to trip on low suction pressure at 10:30 Real Time/02: 20 Drill Time. The Reactor automatic trip fails to bring the Reactor subcritical. A manual trip initiated by the Control Room staff also failures to bring the Reactor subcritical. Rapid boration is started.
5.5.2.5 Postulated Fuel Damage sequence Unit 2 has been plagued with porous fuel pins (manufacturing defects} and the RCS activity is elevated with approximately 0.01% cladding failures. The failure of the Reactor to go subcritical and the fact subcooling is lost will cause 15%
cladding failure.
5.5.2.6 Radiological Release to the Environment At 09:20 Real Time/01:20 Drill Time, the Gas Decay Tank #21 develops a small leak that is picked up by the Plant Vent, monitored, and released to the environment.
This release is below Technical Specifications
* CONFIDENTIAL SCENARIO INFORMATION Section 5.6 PUBLIC SERVICE ELECTRIC AND GAS COMPANY ARTIFICIAL ISLAND SALEM GENERATING STATION 1993 ANNUAL EMERGENCY PREPAREDNESS EXERCISE SCOPE AND OBJECTIVES SCOPE:
The 1993 Annual Exercise of the Artificial Island Emergency Plan will simulate accident events at the Salem Generating Station. The exercise will involve events that test the effectiveness of PSE&G's Emergency Preparedness Program.
On Wednesday, June 23, 1993, a daytime announced exercise will be evaluated by the NRC Region I. The States of New Jersey and Delaware will partially participate in this exercise, but will not be evaluated by FEMA.
To improve realism and to minimize the distraction to the Salem Control Room Operators on duty, this exercise will be conducted from the Salem Simulator at PSE&G's Nuclear Training Center.
All ether emergency response activities will take place in the designated response facilities 0f the emergency plan~
This exercise will include a demonstration of Recovery Planning Activities. Time constraints will not allow for full implementation of Recovery.
To establish the scope and boundaries of the exercise scenario, a definitive set of objectives has been developed. The objectives were used to a~certain the required inputs to the exercise sequence of events and to establish evaluation critique areas to be observed during the exercise.
OBJECTIVES:
A. Emergency Response Facilities
: 1. Demonstrate the activation and staffing of emergency response facilities.
: 2. Demonstrate    communication  capabilities  between emergency response facilities.
: 3. Demonstrate adequacy of facilities and displays to support emergency operations.
5.6.1 L
 
CONFIDENTIAL'SCENARIO INFORMATION Section 5.6 B. Event Classification and Notifications
: 1. Demonstrate proficiency in recognizing and classifying emergency conditions in accordance with the Salem Event Classification Guide (ECG) and the ability to implement Emergency Plan Implementing Procedures (EPIP's).
: 2. Demonstrate the capability of the Salem Generating station to perform timely notifications to the states of New Jersey and Delaware.
: 3. Demonstrate the ability to communicate technical information between emergency response facilities and to the NRC via the NRC Emergency Notification System (ENS) and the Emergency Response Data System (EROS) .
: 4. Demonstrate the capability to formulate around the clock emergency response duty rosters to allow the extended activation of the emergency response facilities.
: c. Emergency Management Demonstrate the capability of the Artificial Island 1.
Emergency Response Organization to implement the Artificial Island Emergency Plan and Procedures.
: 2. Demonstrate the ability to          turnover Emergency Coordinator responsibilities        between designated personnel    responsible    for    overall    emergency management.
: 3. Demonstrate the ability of key emergency personnel to initiate and coordinate timely and effective decisions with respect to a radiological emergency and    clearly  demonstrate    command  and  control functions as applicable.
: 4. Demonstrate effective organizational control        and integrated radiological emergency response.
: 5. Demonstrate that emergency management personnel identify changing plant conditions          and  brief facility personnel concerning the degraded or improved plant status.
: 6. Demonstrate the ability of Emergency          Management personnel to perform Recovery Planning .
* 5.6.2
 
CONFIDENTIAL SCENARIO INFORMATION Section 5.6 D. Accident Assessment
: 1. Demonstrate the ability of emergency response personnel to communicate with and control field teams    along    with    receiving    and  assessing radiological data from the field teams and installed radiation monitors within the plant.
: 2. Demonstrate the ability of emergency response personnel to make Protective Action Recommendations (PAR's) based on plant conditions and/or dose assessment.
E. Public Information and Media Relations
: 1. Demonstrate the staffing of the Emergency News Center (ENC) by Artificial Island emergency response personnel and facility activation.
: 2. Demonstrate the capability to issue        coordinated periodic public information bulletins.
: 3. Demonstrate the ability to provide clear, timely and accurate briefings to the News Media.
F. Operations and Operations Support
: 1. Demonstrate the Control Room Staff's ability to recognize operational symptoms and plant parameters indicative of degrading plant conditions and take appropriate corrective actions.
: 2. Demonstrate    proper  communications    methods  and ability to complete timely notifications to *offsite agencies.                  *          *
: 3. Demonstrate the ability to        implement  protective actions for site personnel.
: 4. Demonstrate command and control functions within the Operations Support Center (OSC).
: 5. Demonstrate the ability to properly set up,        staff and operate the osc.
: 6. Demonstrate the ability of    osc  dispatched teams to respond.
5.6.3
 
CONFIDENTIAL SCENARIO INFORMATION Section 5.6 G* Health Physics and Exposure Control
: 1. Demonstrate the decision making process for limiting exposure of emergency workers.
: 2. Demonstrate methods and resources for distributing dosimetry    and    thyroid  blocking  agents,  if appropriate, to emergency workers.
: 3. Demonstrate adequate health physics support for osc teams deployed in areas of radiological concern.
H. Engineering and Technical Support
: 1. Demonstrate the ability to develop alternative methods or equipment alterations in response to accident affected plant systems or components.
: 2. Demonstrate the ability to assess plant operational data and provide recommendations concerning accident mitigation or engineering based PAR's.
: 3. Demonstrate the ability to identify or recognize when fission product boundaries are failed.
* I.
: 4. Demonstrate the ability to using the data available.
Security estimate fuel  damage
: 1. Demonstrate effective site security operations and the ability to establish and control security access as defined in Security's Emergency Plan Implementing Procedures *
* 5.6.4
 
CONFIDENTIAL SCENARIO INFORMATION Section 5.6 J. Exercise Control and Evaluation
: 1. Demonstrate the ability to control the scenario in accordance with the prescribed time line.
: 2. Demonstrate the ability of the exercise referees to provide scenario data and address questions which pertain to data without prompting the players.
: 3. Demonstrate the ability to adequately critique the exercise performance.
Prepared By:
Approved By:
 
SECTION 6.0 ARTIFICIAL ISLAND ANNUAL EXERCISE *1993 MESSAGE FORMS NOTES:
: 1. The messages contained in this section are for Referee/
Evaluator information only. The messages that are handed
      .out to players during the exercise will be on YELLOW paper and will not include REFEREE NOTES or EXPECTED ACTIONS.
: 2. The page numbers in this section correspond to the message numbers which are generally in chronological order as they will be issued. (Occasionally messages are issued simultaneously at different locations)
: 3. Section 5.2, Scenario Timeline, may be used as an index for all message forms contained in this section. Some message numbers are not issued (skipped) due to revisions of the scenario. Refer to Section 5.2 as a list of effective pages for this section.
: 4. Special codes/messages designators.
c - contingency Message. Issued as needed to maintain the overall scenario timeline or to ensure a specific planned activity is performed for the purpose of demonstrating an objective.
Should not be handed out without Head Referee's permission in sbme cases. (e.g. Event Classifications)
If a Contingency Message is issued. the facility Lead Referee will not the reason and ensure the NRC Evaluator is aware of its purpose as soon as practical after it is issued; R - Radiation Monitor is in warning or alarm. RMS data as seen on the Simulator is not presently modeled to support Emergency Plan scenarios. This message is used to cue the players to review the prepared RMS data displayed in book form by the RMS computer.*
D - Dark Board Message. May be not issued unless needed to support Simulator indications and annunciators. Should be issued if Simulation is FROZEN or unavailable at time of exercise. Information contained in MESSAGE section conveys in abbreviated form what the player would have seen or heard if the Simulator were fully
**        operational .
6.0.0
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:
TO FROM LOCATION 01 SALEM SHIFT PERSONNEL HEAD REFEREE/SIMULATOR REFEREE REAL TIME DRILL TIME ADMIN BLDG CONF. ROOM, SALEM / SALEM SIMULATOR 07:00
                                                            -01:00 MESSAGE THE ATTACHED INFORMATION ARE THE INITIAL CONDITIONS DURING THE DRILL.
THEY ARE FOR YOUR REFERENCE NOW AND AS NEEDED DURING THE DRILL.
WE WILL REVIEW THEM AT THIS TIME AND IF THERE ARE ANY QUESTIONS, PLEASE ASK FOR CLARIFICATION.
THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
REFEREE NOTES :
: 1. PROVIDE A REVIEW OF THE INITIAL CONDITIONS.
: 2. ENSURE THAT ALL PARTICIPANTS ARE IDENTIFIED.
: 3. REVIEW SIGNIFICANT PLAYER INSTRUCTIONS, SCOPE, AND OBJECTIVES OF TODAY'S DRILL AS NEEDED.
: 4. ENSURE PLAYERS AND REFEREES ARE IN Po'SITION TO START THE DRILL BY 08:00 HOURS.
: 5. INSTRUCT PLAYERS TO CALL DID EXT. 3339 TO CONTACT CONTROL ROOM (SIMULATOR)
EXPECTED ACTIONS :
: 1. LEAD REFEREE IN THE SIMULATOR WILL HOLD AN INITIAL CONDITIONS BRIEFING FOR CONTROL ROOM STAFF & COMMUNICA-TORS IN PARALLEL WITH THIS BRIEFING.
: 2. ENSURE KEY PLAYERS AND REFEREES ARE AVAILABLE TO START THE DRILL.
: 3. ENSURE CONTROL ROOM CONTROLLER IS AVAILABLE TO SUPPORT DRILL COORDINA-TION WITH THE DUTY SHIFT.
6.01
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  02                                  REAL TIME  07:50 TO          SNSS (SALEM & HOPE CREEK)            DRILL TIME -00:10 FROM        CONTROL ROOM DRILL CONTROLLER LOCATION    CONTROL ROOMS (SALEM & HOPE CREEK)
MESSAGE PLEASE MAKE THE FOLLOWING PAGE ANNOUNCEMENT:
    "ATTENTION ALL PERSONNEL. ATTENTION ALL PERSONNEL",
    "AN EMERGENCY PLAN DRILL WILL BE HELD TODAY AT SALEM COMMENCING AT 08:00 HOURS".
    "ONLY DESIGNATED DRILL PARTICIPANTS ARE REQUIRED TO RESPOND TO DRILL MESSAGES AND ANNOUNCEMENTS. ALL OTHER PERSONNEL SHALL CONTINUE WITH THEIR NORMAL WORK FUNCTIONS."
    "THIS IS A DRILL. THIS IS A DRILL."
PLEASE REPEAT MESSAGE ONE TIME.
* THIS IS A DRILL ! ! !                      *
*
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS!!!
REFEREE NOTES :
: 1. PROVIDE THIS MESSAGE TO THE RESPECTIVE SNSS'S AT EACH STATION.
: 2. CONTACT LEAD REFEREE AT THE SALEM SIMULATOR TO ESTABLISH CONTROLLER PHONE NUMBERS TO BE USED THROUGHOUT THE DRILL & SYNCHRO-NIZE WATCHES WITH THE SALEM CONTROL ROOM. CONFIRM NO OPERATIONAL PROBLEMS AT EITHER STATION THAT WOULD POSTPONE DRILL START.
EXPECTED ACTIONS :
REFEREE NOTES (CONT'D)
: 4. ENSURE THAT SALEM DUTY SNSS IS AWARE THAT AN ACTUAL PASS SAMPLE MAY BE TAKEN DURING THE DRILL.
: 5. HEAD REFEREE, ENSURE THAT THE SALEM CR CONTROLLER IS IN PLACE TO COORDI-NATE SIMULATOR/CR INTERFACE, STATION PA ANNOUNCEMENTS, ETC *
* 6.02
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:    03                                REAL TIME  08:05 TO            CONTROL ROOM STAFF                DRILL TIME 00:05 FROM          SIMULATOR REFEREE LOCATION      SIMULATOR (SALEM)
MESSAGE YOU HAVE JUST RECEIVED THE FOLLOWING CONTROL CONSOLE BEZEL ALARM ON 2CC1:
                "OVERHEAD ANNUN TRBL"
* THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!  *.
REFEREE NOTES :
: 1. THE OVERHEAD ANNUNCIATOR SYSTEM HAS FAILED.
: 2. FOR DARK BOARD ONLY. IF/WHEN ANNUNCIATOR CRT IS CHECKED IT WILL INDICATE TIME AT 08:05.
: 3. NCO SHOULD NOTIFY THE SNSS OF THE FAILURE AND THE SNSS SHOULD REFER TO THE ECG FOR EVENT CLASSIFICATION.
: 4. REFER TO SUPPLEMENTAL SCENARIO # 7.01.
EXPECTED ACTIONS :
: 1. OPERATORS TO IMPLEMENT S2.0P-AB.ANN-0001 (Q).
: 2. ATTEMPT TO RESET THE OHA SYSTEM IN ACCORDANCE WITH S2.0P-SO.ANN-0001(Q).
WILL BE UNSUCCESSFUL.
: 3. SNSS/NSS TO EVALUATE PLANT CONDITIONS
: 4. REFER TO THE EVENT CLASSIFICATION GUIDE.
6.03
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  04                              REAL TIME    08:10 TO          CONTROL ROOM STAFF              DRILL TIME    00:10 FROM        SIMULATOR REFEREE LOCATION    SIMULATOR (SALEM)
MESSAGE YOUR ATTEMPTS TO RESET THE ANNUNCIATOR SYSTEM AND VERIFY OPERABILITY HAVE BEEN UNSUCCESSFUL.
* THIS IS A DRILL!!!                          *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES :
: 1. REFEREE SHOULD HAVE COPIES OF THE ANNUNCIATOR PROCEDURES.
: 2. THIS MESSAGE TO BE GIVEN TO THE NCO WHEN HE ATTEMPTS TO RESET THE OVERHEAD ANNUNCIATORS.
EXPECTED ACTIONS :
: 1. OPERATIONS STAFF TO IMPLEMENT THE NECESSARY PROCEDURES TO RESET THE OVERHEAD ANNUNCIATORS.
: 2. RESTORATION WILL BE UNSUCCESSFUL AND THE SNSS/NSS WILL BE NOTIFIED *
* 6.04
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE .FORM MESSAGE #:  05D                              REAL TIME      08:10 TO          CONTROL ROOM STAFF              DRILL TIME      00:10 FROM        SIMULATOR REFEREE LOCATION    SIMULATOR (SALEM)
MESSAGE YOU HAVE JUST RECEIVED THE FOLLOWING ALARMS AND INDICATIONS:
BEZEL ALARMS:
PRESSURIZER LEVEL LOW.
CONTROL AND BACKUP HEATERS, GREEN BACKLIGHT FLASHING.
INDICATIONS:
CHANNEL 3 PRESSURIZER LEVEL INDICATES ZERO.
LETDOWN ISOLATED.
* THIS IS A DRILL!!!                          *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS ! ! !  **
REFEREE NOTES :
: 1. THIS MESSAGE FOR DARK BOARD ONLY.
: 2. THE OVERHEAD ANNUNCIATORS ARE NOT FUNCTIONING PROPERLY DUE TO A FAILURE IN THE 12VDC POWER SUPPLY.
: 3. THIS MESSAGE SHOULD CONFIRM TO THE OPERATORS THAT THE ANNUNCIATORS ARE FAILED. WITH THE OVERHEAD ANNUNCIATORS INOPERABLE THE SNSS/NSS SHOULD REFER TO THE ECG FOR DECLARATION OF AN ALERT.
: 4. REFER TO SUPPLEMENTAL SCENARIOS # 7.01 & 7.02 EXPECTED ACTIONS :
: 1. OPERATORS TO IMPLEMENT CORRECTIVE ACTION FOR LOSS OF INSTRUMENTATION.
: 2. SWAP TO OTHER CHANNEL ON THE CONTROL CONSOLE.
: 3. RE-ENERGIZE THE PRESSURIZER HEATERS RE-ESTABLISH LETDOWN.
: 4. CONTACT THE SHIFT I&C TECHNICIAN TO INVESTIGATE THE PROBLEM AND TRIP THE APPLICABLE BISTABLE.
: 5. NO ALARMS RECEIVED ON THE OVERHEAD WHEN THE CHANNEL FAILED.
: 6. SNSS/NSS REVIEW THE ECG.
6.0SD
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  06C                              REAL TIME    08:30 TO          SNSS                            DRILL TIME    00:30 FROM        LEAD SIMULATOR REFEREE LOCATION    SIMULATOR (SALEM)
MESSAGE THIS IS A CONTINGENCY MESSAGE:
YOU SHOULD DECLARE AN ALERT IN ACCORDANCE WITH ECG SECTION lOB; LOSS OF MOST OR ALL ANNUNCIATION FOR GREATER THEN 15 MINUTES.
* THIS IS A DRILL!!!                        *
*
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES :
: 1. THIS MESSAGE TO BE ISSUED ONLY WITH THE CONCURRENCE OF THE HEAD REFEREE.
: 2. THIS MESSAGE NEEDED TO MAINTAIN SCENARIO TIMELINE.
: 3. 15 MINUTES MUST ELAPSE PRIOR TO THE DECLARATION OF THE ALERT.
: 4. BE PREPARED TO PROVIDE MARKED UP COPIES OF ATTACHMENTS AND EPIPS FOR DRILL USE.
: 5. ASSEMBLY WILL BE DEMONSTRATED BY SALEM DRILL PARTICIPANTS ONLY.
EXPECTED ACTIONS :
: 1. SNSS SHOULD REFER TO ECG SECTION lOB AND DECLARE AN ALERT.
: 2. IMPLEMENT ECG ATTACHMENT 2 AND EPIP 102S.
: 3. DIRECT DESIGNATED COMMUNICATORS TO MAKE THE NOTIFICATIONS.
: 4. DIRECRT THE SSS TO ACTIVATE THE OSC *
* 6.06C
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  07R                                REAL TIME      09:20 TO          CONTROL ROOM STAFF                DRILL TIME    01:20 FROM        SIMULATOR REFEREE LOCATION    SIMULATOR (SALEM)
MESSAGE YOU HAVE JUST RECEIVED THE FOLLOWING INDICATIONS:
RADIATION MONITOR TYPE WRITER PRINT OUT INITIATED.
PRINTOUT INDICATES:
STATUS CHANGE:
06/23/93 09:20:00  C2R16 PLANT VENT GROSS    WARN 5.86E+03 CPM.
06/23/93  09:20:00  C2R41C PLANT VENT GAS      WARN 2.34E+04 CPM.
* THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
********************************************~*************************
REFEREE NOTES.:
: 1. EP TO PROVIDE ALL RMS DATA AS REQUIRED FOR THE DRILL. THE RMS COMPUTER AT THE SIMULATOR WIIL NOT BE USED.
: 2. SINCE THE OVERHEAD ANNUNCIATORS ARE INOPERABLE NO ALARMS WILL BE RECEIVED IN THE CONTROL ROOM* (OHA A-6) ** NO ALARM ON THE 2RP1 PANEL, THE TYPEWRITER WILL START TO PRINT THE CHANGE OF STATE.
: 3. WHEN CHECKED ON 2RP1 PANEL 21 GAS DECAY TANK PRESSURE IS DECREASING
: 4. 2R16 PLANT VENT AND 2R41C LOW RANGE EFFLUENT PLANT VENT NOBLE GAS RAD MOMITORS ARE IN WARNING.
EXPECTED ACTIONS :
: 1. IF/WHEN THE PROBLEM WITH THE GAS DE-CAY TANK IS IDENTIFIED, THE CONTROL ROOM STAFF WILL MONITOR THE GAS DECAY TANK PRESSURES.
: 2. CONTROL ROOM STAFF TO IMPLEMENT S2.
OP-AB.RAD-OOOl(Q), ATTACHMENT 1.
: 3. ANNOUNCE OVER THE PLANT PAGE THE AFFECTED RADIATION MONITOR NAME AND NUMBER.
6.07R
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM
* MESSAGE #:
TO FROM LOCATION 08R CONTROL ROOM STAFF SIMULATOR REFEREE SIMULATOR (SALEM)
REAL TIME DRILL TIME 09:25 01:25 MESSAGE YOU HAVE JUST RECEIVED THE FOLLOWING INDICATIONS:
2RP1 PANEL ALARM ANNUNICATOR AND RADIATION MONITOR TYPE WRITER PRINTOUT INITIATED.
PRINTOUT INDICATES:
STATUS CHANGE:
06/23/93 09:25:00    C2R16 PLANT VENT GROSS    ALARM 1.74E+04 CPM.
06/23/93  09:25:00  2R41C PLANT VENT GAS      ALARM 1.42E+05 CPM.
* THIS IS A DRILL ! ! !                          *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES :
: 1. EP TO PROVIDE ALL RMS DATA AS REQUIRED FOR THE DRILL. THE RMS COMPUTER AT THE SIMULATOR WILL NOT BE USED.
: 2. REFEREE TO ENSURE CHART RECORDER ON 2RP1 IS OPERABLE, OR BE PRE-PARED TO POST A STICKY SHOWING THE GAS DECAY TANK PRESSURE DECREAS-ING.
: 3. IF/WHEN ASKED NO OTHER GAS DECAY TANKS ARE AFFECTED.
: 4. 2Rl6 AND 2R41C RAD MONITORS IN ALARM. ALARM ON 2RP1 PANEL #(7).
: 5. REFER TO SUPPLEMENTAL SCENARIO# 7.03.
EXPECTED ACTIONS :
: 1. SNSS TO DIRECT THE OSCC TO SEND OUT A CORRECTIVE ACTION AND REPAIR TEAM TO INVESTIGATE THE PROBLEM.
: 2. SINCE THIS IS A VALID RADIATION ALARM THE OSC RAD PRO SUPERVISOR SHOULD EN-SURE THAT ALL CONCERNED PARTIES ARE MADE AWARE OF THE CHANGING CONDITIONS
: 3. ONCE THE TEAM IS THOROUGHLY BRIEFED THEY WILL BE DISPATCHED *
* 6.08R
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  09C                                REAL TIME  09:40 TO          SNSS                                DRILL TIME 01:40 FROM        SIMULATOR REFEREE LOCATION    SIMULATOR (SALEM)
MESSAGE THIS IS A CONTINGENCY MESSAGE:
YOU SHOULD DIRECT THE OSC TO DISPATCH A TEAM TO INVESTIGATE THE ONGOING RADIOLOGICAL RELEASE.
* THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
*********************************************************************~
REFEREE NOTES :
: 1. THIS MESSAGE ONLY TO BE ISSUED IF THE SNSS HAS NOT NOTIFIED THE OSC TO DISPATCH A TEAM TO 21 GAS DECAY TANK.
: 2. THIS MESSAGE DELAYED TO ENSURE THE OSC TEAM THAT IS DISPATCHED RE-CEIVES A THOROUGH BRIEFING BY THE RAD PRO SUPERVISOR.
: 3. REFER TO SUPPLEMENTAL SCENARIO # 7.03.
EXPECTED ACTIONS :
: 1. OSC NOTIFIED, TEAM BRIEFED ON THE ACTIVITY AND DISPATCHED.
: 2. SNSS/EDO MAY DIRECT IMPLEMENTATION OF ACCOUNTABILITY.
6.09C
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  10                              REAL TIME      10:00 TO          osc TEAM LEADER                DRILL TIME    02:00 FROM        osc REFEREE LOCATION    GAS DECAY TANK AREA AUX. BLDG. ELEV. 64' MESSAGE YOU HAVE CHECKED THE GAS DECAY TANK AREA AND HEAR A HISSING NOISE COMING FROM THE AREA NEAR 21 GAS DECAY TANK VALVE ROOM.
* THIS IS A DRILL!!!                        *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES :
: 1. A SMALL PRESSURE TAP ON 21 GAS DECAY TANK HAS FAILED AND IS LEAK-ING INTO THE AUXILIARY BUILDING.
: 2. THE PRESSURE TAP IS PT-1036. REFER TO P&ID 205340 SHEET 2.
: 3. THE LEAK CAN BE STOPPED BY CLOSING THE ROOT VALVE 21WG32.
: 4. REFER TO SUPPLEMENTAL SCENARIO # 7.03
: 5. RELEASE RATE STARTS TO DECREASE.
EXPECTED ACTIONS :
: 1. EXPECT THE OSC TEAM TO CHECK ALL THE TANKS AND PRESSURE SENSING LINES IN AN EFFORT TO IDENTIFY AND STOP THE GAS LEAK INTO THE AUXILIARY BUILDING .
* 6.10
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  11                                REAL TIME  10:00 TO          SHIFT TECHNICIAN                  DRILL TIME  02:00 FROM        OSC REFEREE LOCATION    EQUIPMENT RACKS (BEHIND UNIT 2 CONTROL ROOM)
MESSAGE YOUR TROUBLESHOOTING EFFORTS FIND THAT THE PARTS REQUIRED TO REPAIR THE LEVEL CHANNEL IS NOT AVAILABLE IN THE STOREROOM.
THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS!!!
REFEREE NOTES :
: 1. CHANNEL WILL BE RESTORED AFTER RECOVERY TIME ACCELERATION.
: 2. REFEREE TO ENSURE THIS MESSAGE IS RECEIVED IN THE CONTROL ROOM.
: 3. REFER TO SUPPLEMENTAL SCENARIO # 7.02 EXPECTED ACTIONS :
: 1. SHIFT TECHNICIAN COMPLETES ALL TROUBLESHOOTING AND NOTIFIES THE CON-TROL ROOM.
6.11
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM
* MESSAGE #:
TO FROM LOCATION 12R CONTROL ROOM STAFF SIMULATOR REFEREE SIMULATOR (SALEM)
REAL TIME DRILL TIME 10:00 02:00 MESSAGE YOU HAVE JUST RECEIVED THE FOLLOWING ALARM:
2RP1 PANEL ALARM ANNUNCIATOR REFLASH (PROCESS RAD MONITOR) .
RADIATION MONITOR TYPEWRITER PRINTOUT INITIATED.
PRINTOUT INDICATES:
STATUS CHANGE:
06/23/93 10:00:00    C2R16 PLANT VENT GROSS      .WARN 9.34E+03 CPM.
* THIS IS A DRILL ! ! !                          *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES :
: 1. EP TO PROVIDE ALL RMS DATA AS REQUIRED FOR THE DRILL. THE RMS COMPUTER AT THE SIMULATOR WILL NOT BE USED.
: 2. OVERHEAD ANNUNCIATORS ARE STILL INOPERABLE. THE RMS STATUS CHANGE WILL ANNUNCIATE ON THE 2RP1 PANEL.
: 3. 2R16 PLANT VENT MONITOR IN' WARNING. PLANT EFFLUENT LEVELS ARE DE-CREASING AT THIS TIME.
EXPECTED ACTIONS :
: 1. OPERATIONS STAFF TO REVIEW THE RES-PONSE FOR THE RADIATION ALARM *
* 6.12R
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  13C                                REAL TIME  10:15 TO          OSC TEAM LEADER                    DRILL TIME 02:15 FROM        OSC REFEREE LOCATION    21 GAS DECAY TANK AUX. BLDG. ELEV. 64 1 MESSAGE YOU HAVE SUCCESSFULLY ISOLATED AND STOPPED THE LEAK ON 21 GAS DECAY TANK.
THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
REFEREE NOTES :
: 1. THE LEAK CAN BE STOPPED BY CLOSING THE PRESSURE TAP ROOT VALVE 21WG32.
: 2. THIS ACTIVITY WILL BE SUCCESSFUL AND NO OTHER LEAKS WILL OCCUR.
: 3. REFER TO SUPPLEMENTAL SCENARIO # 7.03.
EXPECTED ACTIONS
: 1. OSC TEAM MEMBER TO CLOSE ROOT VALVE.
: 2. OSC TEAM LEADER TO NOTIFY THE OSC COORDINATOR THAT THE LEAK HAS BEEN STOPPED.
6.13C
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  14C                              REAL TIME      10:15 TO          CONTROL ROOM STAFF              DRILL TIME      02:15 FROM        SIMULATOR REFEREE LOCATION    SIMULATOR (SALEM)
MESSAGE YOU HAVE JUST RECEIVED THE FOLLOWING INDICATIONS:
2RP1 PANEL ALARM ANNUNICATOR REFLASH (PROCESS RAD MONITOR) .
RADIATION MONITOR TYPEWRITER PRINTOUT INITIATEO.
PRINTOUT INDICATES:
STATUS CHANGE:
06/23/93 10:15:00    C2R16 PLANT VENT GROSS  WARN  l.99E+03 CPM CLEAR.
06/23/93  10:15:00  C2R41C PLANT VENT GAS  ALARM  9.08E+03 CPM CLEAR
* THIS IS A DRILL!!!                          *
*
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
REFEREE NOTES :
: 1. THE GAS DECAY TANK LEAK HAS BEEN ISOLATED AND THE RADIATION RELEASE RATE IS DECREASING.
EXPECTED ACTIONS :
: 1. SRPT TO NOTIFY THE SNNS/SNSS OF THE DECREASING RADIATION RELEASE RATE .
* 6.14C
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:    15D                                REAL TIME  10:30 TO            CONTROL ROOM STAFF                DRILL TIME 02:30 FROM          SIMULATOR REFEREE LOCATION      SIMULATOR (SALEM)
MESSAGE YOU HAVE JUST RECEIVED THE FOLLOWING INDICATIONS:
GREEN TRIP LIGHTS FLASHING ON BOTH STEAM GENERATOR FEED PUMPS.
SUCTION PRESSURE DECREASING* RAPIDLY.
BEZEL ALARMS:
    "FLOW DEVIATION FS>FW" ON ALL 4 STEAM GENERATORS.
    "SUCTION PRESS LOW" ON 21 AND 22 FEED PUMP BEZELS.
INDICATIONS:
      #22 AND #23 AUXILIARY FEED WATER PUMPS RUNNING.
THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
REFEREE NOTES :
: 1. THIS MESSAGE FOR DARK BOARD ONLY.
: 2. IF/WHEN CONDENSATE POLISHING IS BYPASSED THE SUCTION PRESSURE WILL CONTINUE TO DECREASE.
: 3. DEPENDING ON CONDITIONS IN THE CONTROL ROOM AT THIS TIME, THE SNSS/
NSS MAY HAVE A MANUAL TRIP INITIATED.
: 4. REFER TO SUPPLEMENTAL# 7.04.
EXPECTED ACTIONS :
: 1. OPERATORS TO INITIATE A MANUAL REACT-OR/ TURBINE TRIP.
: 2. CONTROL ROOM STAFF TO IMPLEMENT EOP-TRIP-1, REACTOR TRIP OR SAFETY INJEC-TION.
6.15D
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM
* MESSAGE #:
TO FROM LOCATION 16D CONTROL ROOM STAFF SIMULATOR REFEREE SIMULATOR (SALEM)
REAL TIME DRILL TIME 10:31 02:31 MESSAGE YOU OBSERVE THE FOLLOWING:
ALL CONTROL AND SHUTDOWN RODS HAVE NOT INSERTED IN THE CORE.
* THIS IS A DRILL ! ! !                      *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES :
: 1. THIS MESSAGE FOR DARK BOARD ONLY.
: 2. IF/WHEN ASKED THERE WAS A RECEIPT OF A VALID REACTOR TRIP ON 2RP4.
: 3. THE AUTOMATIC AND MANUAL TRIP THAT HAS BEEN INITIATED DID NOT BRING THE REACTOR SUBCRITICAL.
: 4. RAPID BORATION IS STARTED IN ACCORDANCE WITH PROCEDURE.
: 5. IF ASKED, 2E6D FAILS TO OPEN.
EXPECTED ACTIONS :
: 1. MANUAL REACTOR TRIP INITIATED.
: 2. CONTROL ROOM STAFF IMPLEMENT EOP-TRIP-1
: 3. COMMENCE RAPID BORATION.
: 4. EXIT EOP-TRIP-1 AND ENTER EOP-FRSM-1 *
* 6.16D
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  17D                                  REAL TIME  10:31 TO          CONTROL ROOM STAFF                  DRILL TIME 02:31 FROM        SIMULATOR REFEREE LOCATION    SIMULATOR (SALEM)
MESSAGE YOU OBSERVE THE FOLLOWING:
REACTOR COOLANT PRESSURE AT 1300 PSIG.
INDICATIONS:
PRl AND PR2 INDICATE CLOSED.
PSl AND PS2 INDICATE CLOSED.
SAFETY VALVE TAILPIPE TEMPERATURE IS 270 DEGREES F.
BEZEL ALARM:
HPRT PRESS HI"
* THIS IS A DRILL . ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
REFEREE NOTES :
: 1. THIS MESSAGE FOR DARK BOARD ONLY.
: 2. ALONG WITH THE ANTICIPATED TRANSIENT WITHOUT TRIP, AND LOSS OF FEED A PRESSURIZER SAFETY VALVE FAILS OPEN AND PRESSURE DECREASES TO 1300 PSIG BEFORE IT RESEATS.
: 3. DURING THIS TRANSIENT SUBCOOLING IS LOST AND FUEL DAMAGE OCCURS.
: 4. DEPENDING ON CONDITIONS IN THE CONTAINMENT, THE SNSS/NSS MAY RE-QUEST THE OSC TO DISPATCH A TEAM TO INSPECT FOR SOURCES OF LEAKAGE IN THE CONTAINMENT.
EXPECTED ACTIONS :
: 1. CONTROL ROOM .STAFF CHECKS THE CONSOLE IN ORDER TO IDENTIFY THE LOW PRESSURE PROBLEM.
: 2. TAIL PIPE TEMPERATURES SLIGHTLY ELEV-ATED AND ALARM RECEIVED ON THE PRESS-URIZER RELIEF TANK.
: 3. SNSS WILL ASSESS PLANT CONDITIONS AND CONSIDER RECOMMENDING ESCALATION OF THE EMERGENCY CLASSIFICATION TO THE EDO.
6.17D
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM
* MESSAGE #:
TO FROM LOCATION 18D CONTROL ROOM STAFF SIMULATOR REFEREE SIMULATOR {SALEM)
REAL TIME DRILL TIME 10:33 02:33 MESSAGE YOU HAVE JUST RECEIVED THE FOLLOWING ALARMS AND INDICATIONS:
ALARMS ON 23 AUXILIARY FEED PUMP:
GREEN BACKLIGHTS .FLASHING:
11 23 STOP" "2MS52 TRIP VALVE CLOSED" INDICATIONS:
SPEED DECREASING TO ZERO, STEAM GENERATOR AUX FEED FLOW DECREASING.
* THIS IS A DRILL ! ! !                    *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES :
: 1. THIS MESSAGE FOR DARK BOARD ONLY.
: 2. REFER TO SUPPLEMENTAL # 7.07A.
EXPECTED ACTIONS :
: 1. DIRECT THE OSC TO INVESTIGATE TRIP OF
          #23 AUXILIARY FEED PUMP.
I .
* 6.18D
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  19                              REAL TIME      10:38 TO          SNSS                            DRILL TIME    02:38 FROM        OSC REFEREE LOCATION    UNIT 2 TURBINE BLDG. WEST SIDE ELEV. 100' MESSAGE PROVIDE THE FOLLOWING INFORMATION TO THE SIMULATOR AT EXT. 3339:
  "THIS IS OFFICER JOHN SMITH. AS WE WERE LEAVING UNIT 2 TURBINE BUILDING STEAM FILLED THE AREA. I MANAGED TO EXIT. THE BUILDING NEAR THE MIXING BOTTLES HOWEVER MY PARTNER WAS ENGULFED IN STEAM ON ELEVATION 100 WEST OF THE CONDENSERS. HE IS STILL IN THE BUILDING, SEND HELP QUICK".
* THIS IS A DRILL!!!
*
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
REFEREE NOTES :
: 1. FOR SCENARIO CONTROL SITE PROTECTION WILL PROVIDE VICTIM.
: 2. THIS SCENARIO WILL NOT IMPACT SECURITIES WORK FORCE.
: 3. REFER TO SUPPLEMENTAL SCENARIO # 7.05.
: 5. VICTIM IS NOT CONTAMINATED.
EXPECTED ACTIONS :
: 1. SNSS DIRECTS THE OSC TO INITIATE A SEARCH AND RESCUE TEAM.
6.19
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM
* MESSAGE #:
TO FROM LOCATION 20D CONTROL ROOM STAFF SIMULATOR REFEREE SIMULATOR (SALEM)
REAL TIME DRILL TIME 10:45 02:45 MESSAGE YOU OBSERVE.THE FOLLOWING:
REACTOR TRIP BREAKERS AND MG SET BREAKERS INDICATE OPEN.
ALL IRPI INDICATE ALL RODS FULLY INSERTED.
* THIS IS A DRILL ! !!                      *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES * :
: 1. THIS MESSAGE FOR DARK BOARD ONLY.
: 2. THESE INDICATIONS CONFIRM THE REACTOR TRIP, THE REACTOR TR:fP AND MG SET BREAKERS ARE NOW OPEN.
: 3. REFER TO SUPPLEMENTAL SCENARIO # 7.06.
EXPECTED ACTIONS :
: 1. VERIFY THE REACTOR TRIP BREAKERS AND MG SET BREAKERS ARE OPEN.
: 2. ACKNOWLEDGE THE CONSOLE ALARMS FOR THE REACTOR TRIP AND MG SET BREAKERS.
: 3. CONTINUE WITH PROCEDURE IN EFFECT *
* 6.20D
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:
TO FROM LOCATION 21C SNSS SIMULATOR REFEREE SIMULATOR (SALEM)
REAL TIME DRILL TIME 10:45 02:45 MESSAGE THIS IS A CONTINGENCY MESSAGE:
YOU SHOULD DIRECT THE OSC TO DISPATCH A TEAM TO INVESTIGATE THE PROBLEM WITH 23 AUXILIARY FEED PUMP.
* THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!  **
REFEREE NOTES :
: 1. THIS MESSAGE ONLY TO BE ISSUED IF THE SNSS HAS NOT NOTIFIED THE OSC TO DISPATCH.A TEAM TO 23 AUXILIARY FEED PUMP.
: 2. REFER TO SUPPLEMENTAL SCENARIO # 7.07A.
EXPECTED ACTIONS :
: 1. OSC NOTIFIED, TEAM BRIEFED ON THE ACTIVITY AND DISPATCHED.
6.21C
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM
* MESSAGE #:
TO FROM LOCATION 22C EDO / SNSS LEAD REFEREE TSC / SIMULATOR (SALEM)
REAL TIME DRILL TIME 10:55 02:55 MESSAGE THIS IS A CONTINGENCY MESSAGE:
YOU SHOULD DECLARE A SITE AREA EMERGENCY PER ECG SECTION 10 C, LOSS OF MOST OR ALL ANNUNCIATORS WITH A PLANT TRANSIENT INITIATED/
IN PROGRESS.
* THIS IS A DRILL ! ! !                    *
  *,    DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS!!!
* REFEREE NOTES :
: 1. CONFER WITH THE HEAD REFEREE PRIOR TO ISSUING THIS MESSAGE.
: 2. ISSUE THIS MESSAGE ONLY IF EDO/SNSS ARE NOT IN THE PROCESS OF CLASSIFYING THE EVENT.
EXPECTED ACTIONS :
: 1. DECLARE A SITE AREA EMERGENCY.
: 2. IMPLEMENT ECG ATTACHMENT 3.
: 3. IMPLEMENT EPIP 103S.
: 4. IMPLEMENT LIMITED ACCOUNTABILITY IF NOT ALREADY DONE *
* 6.22C
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:    23R                                REAL TIME    11:00 TO            CONTROL ROOM STAFF                DRILL TIME    03:00 FROM          SIMULATOR REFEREE LOCATION      SIMULATOR (SALEM)
MESSAGE YOU HAVE JUST RECEIVED THE FOLLOWING ALARM:
2RP1 PANEL ALARM ANNUNCIATOR AND RADIATION MONITOR TYPE WRITER PRINTOUT INITIATED.
PRINTOUT INDICATES:
STATUS CHANGE:
      *06/32/93 11:00:00 C2R24A SEAL INJ FLTR        ALARM 2.72E+05 mR/HR 06/23/93 11:00:00  C2R25  SEAL WTR FLTR      ALARM 2.72E+05 mR/HR 06/23/93 11:00:00  C2R26  RX CLT FLTR        ALARM 2.72E+05 mR/HR 06/23/93 11:00:00  C2R31  LTDN LINE          ALARM 7.04E+05 CPM
* THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
REFEREE NOTES *:
: 1. EP TO PROVIDE ALL RMS DATA AS REQUIRED FOR THE DRILL. THE RMS COMPUTER AT THE SIMULATOR WILL NOT BE USED.
: 2. OVERHEAD ANNUNCIATORS ARE STILL INOPERABLE, THE RMS ALARM WILL ANNUNCIATE ON THE 2RP1 PANEL.
: 3. 2R24A SEAL WATER INJECTION FILTER, 2R25 SEAL WATER FILTER, 2R26 REACTOR COOLANT FILTER, AND 2R31 LETDOWN (FAILED FUEL) RAD MONITOR ARE ALL IN ALARM.
: 5. THESE ALARMS DUE TO FUEL FAILURE AND ACTIVATE WHEN LTDN RE-ESTAB.
EXPECTED ACTIONS :
: 1. OPERATIONS STAFF TO REVIEW THE RES-PONSE FOR THE RADIATION ALARMS.
6.23R
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS-MESSAGE FORM
* MESSAGE #:
TO FROM LOCATION 24C SNSS / NSSS SIMULATOR REFEREE SIMULATOR (SALEM)
REAL TIME DRILL TIME 11:00-11:15 03:00-03:15 MESSAGE THIS IS A CONTINGENCY MESSAGE:
FOR SCENARIO CONTROL DO NOT IMPLEMENT IOP-6 UNTIL NARROW RANGE STEAM GENERATOR LEVELS ARE RESTORED TO THE NORMAL OPERATING RANGE. CONTINUE IN IOP-8.
* THIS IS A DRILL ! ! !                        *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES :
: 1. THE MESSAGE TO BE ISSUED AS NEEDED TO MAINTAIN THE SCENARIO TIME LINE.
: 2. SIMULATOR REFEREE TO CHECK WITH SIMULATOR INSTRUCTOR PRIOR:TO ISSUING THIS MESSAGE.
: 3. THIS MESSAGE MAY BE ISSUED ANY TIME AFTER 11:00 HOURS.
EXPECTED ACTIONS :
: 1. SNSS / NSS TO CONTINUE WITH IOP-8 AND MAINTAIN HOT STANDBY UNTIL ALL STEAM GENERATOR LEVELS ARE RETURNED TO THE NORMAL OPERATING RANGE *
* 6.24C
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  25C                              REAL TIME    11:10 TO          RAC                                DRILL TIME  03:10 FROM        TSC LEAD REFEREE LOCATION    TECHNICAL SUPPORT CENTER MESSAGE THIS IS A CONTINGENCY MESSAGE:
YOU SHOULD DIRECT THE CHEMISTRY SUPERVISOR TO INITIATE A SAMPLE OF THE REACTOR COOLANT USING PASS.
THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS!!!    **
REFEREE NOTES :
: 1. ISSUE THIS MESSAGE ONLY AS NECESSARY IF A PASS SAMPLE HAS NOT YET BEEN CALLED FOR BY THE EDO OR RAC.
: 2. ENSURE THAT THE PLAYERS UNDERSTAND THAT AN ACTUAL SAMPLE WILL BE TAKEN, NOT SIMULATED.
: 3. PASS SAMPLE RESULTS WILL BE PROVIDED TO THE FUEL ENGINEER (SCENARIO CONTROL} TO ALLOW THE TSC TO DEMONSTRATE CORE DAMAGE ESTIMATION.
: 4. ENSURE THAT THE DUTY SNSS IS AWARE THAT AN ACTUAL PASS SAMPLE WILL BE PERFORMED FOR THE EXERCISE.
EXPECTED ACTIONS :
: 1. RAC WILL INFORM THE EDO OF THE NEED TO OBTAIN A PASS SAMPLE, FOR SCENARIO CONTROL.
: 2. RAC WILL DIRECT THE CHEMISTRY SUPER-VISOR TO INITA~E AN ACTUAL PASS SAMPLE.
6.25C
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  25D                                REAL TIME  11:20 TO          CONTROL ROOM STAFF                DRILL TIME  03:20 FROM        SIMULATOR REFEREE LOCATION    SIMULATOR (SALEM)
MESSAGE YOU HAVE JUST RECEIVED THE FOLLOWING INDICATION:
    #23 AUXILIARY FEED PUMP AUTO START.
* THIS IS A DRILL ! ! !                      *
*
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES :
: 1. THIS MESSAGE FOR DARK BOARD ONLY.
: 2. THE AUXILIARY PUMP WILL BE IN SERVICE AT 11:30.
: 3. REFER TO SUPPLEMENTAL SCENARIO # 7.07A.
EXPECTED ACTIONS :
: 1. MONITOR AUXILIARY FEED WATER PUMP START .
* 6.25D
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  26D                                REAL TIME    11:30 TO          CONTROL ROOM STAFF                DRILL TIME  03:30 FROM        SIMULATOR REFEREE LOCATION    SIMULATOR (SALEM}
MESSAGE YOU HAVE JUST RECEIVED THE FOLLOWING ALARMS AND INDICATIONS:
ALARMS:
GREEN BACKLIGHT "STOP"FLASHING FOR #22 AUXILIARY FEED PUMP INDICATIONS:
            #22 AUXILIARY FEED PUMP AMPS INDICATE ZERO.
            #22 AUXILIARY FEED PUMP DISCHARGE PRESSURE DECREASING.
* THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
REFEREE NOTES :
: 1. THIS MESSAGE FOR DARK BOARD ONLY.
: 2. THIS ACTIVITY TO PROMOTE A OSC TEAM RESPONSE.
3 . REFEREE TO NOTE THAT THE OVERH.EAD ANNUNCIATORS ARE STILL INOPERABLE AND NO OHA'S WILL ILLUMINATE.
: 4. REFER TO SUPPLEMENTAL SCENARIO # 7.08.
EXPECTED ACTIONS :
: 1. SNSS TO DIRECT OSCC TO SEND OUT A CORRECTIVE ACTION AND REPAIR TEAM TO INVESTIGATE THE PROBLEM.
: 2. OSC TO BRIEF TEAM AND THEN DISPATCH TO 22 AUXILIARY FEED PUMP.
6.260
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM
* MESSAGE #:
TO FROM LOCATION 27C SNSS SIMULATOR REFEREE SIMULATOR (SALEM)
REAL TIME DRILL TIME 11:40 03:40 MESSAGE THIS IS A CONTINGENCY MESSAGE:
YOU SHOULD DIRECT THE OSC TO DISPATCH A TEAM TO INVESTIGATE THE PROBLEM WITH 22 AUXILIARY FEED PUMP.
* THIS IS A DRILL ! ! !                    *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES :
: 1. THIS MESSAGE ONLY TO BE ISSUED IF THE SNSS HAS NOT NOTIFIED THE OSC TO DISPATCH A TEAM TO 22 AUXILIARY FEED PUMP.
: 2. REFER TO SUPPLEMENTAL SCENARIO # 7.08.
EXPECTED ACTIONS :
: 1. OSC NOTIFIED, TEAM BRIEFED ON THE ACTIVITY AND DISPATCHED *
* 6.27C
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM M~SSAGE  #: 28                                REAL TIME  11:55 TO          OSC TEAM LEADER                    DRILL TIME  03:55 FROM        OSC REFEREE LOCATION    22 AUXILIARY FEED PUMP, ELEV. 84' & 64' (BREAKER)
MESSAGE YOU OBSERVE THE FOLLOWING:
THE 22 AUXILIARY FEED PUMP IS NOT RUNNING, AND YOU SMELL THE ODOR OF BURNT INSULATION IN THE FEED PUMP AREA.
THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS!!!
REFEREE NOTES
: 1. ENSURE THE OSC TEAM LEADER REPORTS HIS FINDINGS TO THE OSC COORDIN-ATOR.
: 2. IF/WHEN CHECKED THE OVERLOAD RELAY ON THE 4KV BREAKER CUBICLE HAS ACTUATED (YELLOW INDICATOR FLAG DROPPED). NO OTHER BREAKER PROBLEMS WILL BE FOUND.
: 3. REFER TO SUPPLEMENTAL SCENARIO # 7.08.
EXPECTED ACTIONS :
: 1. THE TEAM LEADER TO REPORT HIS FIND-INGS TO THE OSC.
: 2. OSC COORDINATOR TO NOTIFY THE SNSS/
NSS OF THE PROBLEM AND DAMAGE.
6.28
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM
* MESSAGE #:
TO FROM LOCATION 29D CONTROL ROOM STAFF SIMULATOR REFEREE SIMULATOR (SALEM)
REAL TIME DRILL TIME 12:00 04:00 MESSAGE YOU HAVE JUST RECEIVED THE FOLLOWING ALARMS AND INDICATIONS:
ALARMS ON 23 AUXILIARY FEED PUMP:
GREEN BACKLIGHT FLASHING:
11 23 STOP" "2MS52 TRIP VALVE CLOSE" INDICATIONS:
SPEED DECREASING TO ZERO, STEAM GENERATOR WIDE RANGE LEVELS DECREASING.
* THIS IS A DRILL ! ! !                      *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES :
: 1. THIS MESSAGE FOR DARK BOARD ONLY.
: 2. LOSS OF ALL FEED WATER TO THE STEAM GENERATORS.
: 3. REFER TO SUPPLEMENTAL SCENARIO # 7.07.
EXPECTED ACTIONS :
: 1. STEAM GENERATOR LEVELS BEGIN TO DE-CREASE.
: 2. THE NSS SHOULD DIRECT A MANUAL TRIP AND ENTRY INTO THE EOP NETWORK.
: 3. DIRECT OSC TO INVESTIGATE TRIP OF 23 AUXILIARY FEED PUMP .
* 6.290
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  30D                                REAL TIME  12:02 TO          CONTROL ROOM STAFF                DRILL TIME 04:02 FROM        SIMULATOR REFEREE LOCATION    SIMULATOR (SALEM)
MESSAGE YOU OBSERVE THE FOLLOWING:
ALL STEAM GENERATOR LEVELS ARE APPROACHING THEIR LOW-LOW LEVELS ON THE NARROW RANGE INDICATORS.
THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!  *.
*********************************************************************~
REFEREE NOTES :
: 1. THIS MESSAGE FOR DARK BOARD ONLY.
: 2. REFER TO SUPPLEMENTAL SCENARIO # 7.07 & # 7.08.
EXPECTED ACTIONS :
: 1. NSS HAS ORDERED A MANUAL REACTOR TRIP INITATED.
: 2. IMPLEMENT EOP-TRIP-1.
: 3. NOTIFY THE EDO OF THE ESCALATING FEED WATER PROBLEMSo 6.JOD
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM
* MESSAGE #:
TO FROM LOCATION 31C SNSS SIMULATOR REFEREE SIMULATOR (SALEM)
REAL TIME DRILL TIME 12:15 04:15 MESSAGE THIS IS A CONTINGENCY MESSAGE:
YOU SHOULD DIRECT THE OSC TO DISPATCH A TEAM TO INVESTIGATE THE PROBLEM WITH 23 AUXILIARY FEED.PUMP.
* THIS IS A DRILL ! ! !                    *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES :
: 1. THIS MESSAGE ONLY TO BE ISSUED IF THE SNSS HAS NOT NOTIFIED THE OSC TO DISPATCH A TEAM TO 23 AUXILIARY FEED PUMP.
: 2. REFER TO SUPPLEMENTAL SCENARIO # 7.07.
EXPECTED ACTIONS :
: 1. OSC NOTIFIED, TEAM BRIEFED ON THE ACTIVITY AND DISPATCHED *
* 6.JlC
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:
TO FROM LOCATION 32 OSC TEAM LEADER OSC REFEREE REAL TIME DRILL TIME AUXILIARY FEED PUMP AREA, AUX. E:,DG ELEV. 84' 12:25 04:25 MESSAGE YOUR PRELIMINARY CHECKS AND INSPECTIONS OF THE #23 AUXILIARY FEED PUMP, INDICATE THE LATCHING MECHANISM FOR THE TRIP LEVER HAS FAILED.
THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
REFEREE NOTES :
: 1. THE AUXILIARY FEED PUMPS CAN NOT BE RESTORED TO SERVICE FOR APPROX-IMATELY 30 MINUTES. (13:15 HOURS).
: 2. THIS ACTIVITY WILL LEAD TO THE DECLARATION OF A GENERAL EMERGENCY.
: 3. REFER TO SUPPLEMENTAL SCENARIO # 7.07.
EXPECTED ACTIONS :
: 1. WITH THE TRANSIENT INITIATED BY THE LOSS OF FEED, FOLLOWED BY FAILURE OF AUX. FEED FOR AN EXTENDED PERIOD, IT CAN NOT BE RESTORED IN THE 30 MINUTE TIME FRAME. SNSS SHOULD REFER TO THE ECG AND RECOMMEND ESCALATION OF THE EVENT TO THE EDO.
6.32
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:    33C                                REAL TIME  12:45 TO            SNSS / EDO / ERM                  DRILL TIME 04:45 FROM          CR, TSC, EOF LEAD REFEREES LOCATION      SIMULATOR (SALEM), TSC, EOF MESSAGE THIS IS A CONTINGENCY MESSAGE:
YOU SHOULD DECLARE A GENERAL EMERGENCY IN ACCORDANCE WITH ECG SECTION 4C; TRANSIENT INITIATED BY LOSS OF FEED AND COND, FOLLOWED BY A FAILURE OF AUX FEED FOR EXTENDED PERIOD.
* THIS IS A DRILL ! ! !                    *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS!!!
* REFEREE NOTES :
: 1. DO NOT ISSUE THIS MESSAGE WITHOUT HEAD REFEREE'S PERMISSIO~.
: 2. ISSUE THIS MESSAGE ONLY IF THE ERM IS NOT IN THE PROCESS OF:
CLASSIFYING THE EVENT.
: 3. CONTROL ROOM AND EOF REFEREES MUST CONFER WITH THE HEAD REFEREE BEFORE ISSUING.          ,
EXPECTED ACTIONS
: 1. DECLARE A GENERAL EMERGENCY.
: 2. IMPLEMENT ATTACHMENT 4.
: 3. IMPLEMENT EPIP 104S(EPIP 401. APP. B)
: 4. PREDETERMINED PAR SELECTION.
MINIMUM EXPECTED PAR SECTORS              DISTANCE(MILES)
SHELTER ALL SECTORS                0 - 2 SHELTER DOWNWIND +/- 1 SECTOR      2 - 5
* 6.33C
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  34                                REAL TIME    13:05 TO          OSC TEAM LEADER                    DRILL TIME  05:05 FROM        OSC REFEREE 1
LOCATION    23 AUXILIARY FEED PUMP, AUX. BLDG. ELEV. 84 MESSAGE YOUR REPAIRS TO THE 23 AUXILIARY FEED PUMP ARE COMPLETE.
THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!  *.
.REFEREE NOTES :
: 1. ALLOW ABOUT TEN MINUTES TO ELAPSE BEFORE THE AUXILIARY FEED PUMP IS RETURNED TO SERVICE.
: 2. RETURN OF PUMP IS CRITICAL TO THE SCENARIO TIMELINE, OSC REFEREE TO ENSURE MESSAGE IS CALLED INTO THE OSCC, SO AS THE AUXILIARY FEED PUMP IS READY FOR START AT 13:15 HOURS.
: 3. REFER TO SUPPLEMENTAL SCENARIO # 7.07.
EXPECTED ACTIONS :
: 1. OSC TEAM TO CHECK PUMP AND GOVERNOR CONTROLS.
: 2. NOTIFY THE OSC THAT THE PUMP WILL BE RETURNED TO SERVICE IN A SHORT PERIOD OF TIME.
: 3. 23 AUX. FEED PUMP OVERSPEED RESET AND PUMP STARTED.
6.34
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  35D                              REAL TIME    13:15 TO          CONTROL ROOM STAFF              DRILL TIME    05:15 FROM        SIMULATOR REFEREE LOCATION    SIMUULATOR (SALEM)
MESSAGE YOU NOW HAVE INDICATIONS OF 23 AUXILIARY FEED PUMP RESET AND RUNNING.
* THIS IS A DRILL !!!                        *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES :
: 1. THIS MESSAGE FOR DARK BOARD ONLY.
: 2. REFER TO SUPPLEMENTAL SCENARIO # 7.07.
EXPECTED ACTIONS :
: 1. MONITOR AUXILIARY FEED WATER PUMP START.
: 2. STEAM GENERATOR LEVELS BEGIN TO IN-CREASE .
* 6.350
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:    36                                REAL TIME    13:40 TO          OSC TEAM LEADER                    DRILL TIME  05:40 FROM        OSC REFEREE LOCATION      22 AUXILIARY FEED PUMP, AUX.BLDG. ELEV. 84 1 & 64 1 MESSAGE YOUR REPAIRS TO 22 AUXILIARY FEED PUMP ARE COMPLETED.
* THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
REFEREE NOTES :
: 1. THIS MESSAGE TO UPDATE THE OSCC ON THE PROGRESS AND RETURN OF THE 22 AUXILIARY FEED PUMP.
: 2. AT APPROXIMATELY 13:45 HOURS THE SIMULATOR WILL BE FROZEN AND THEN ACCELERATED THIRTY (30) HOURS.
: 3. AT 14:00 HOURS, A NEW SET OF INITIAL CONDITIONS WILL BE GIVEN TO THE CONTROL ROOM, OSC, TSC, AND EOF PLAYERS.
: 4. REFER TO SUPPLEMENTAL SCENARIO # 7.08.
EXPECTED ACTIONS :
: 1. .TEAM LEADER TO NOTIFY THE OSC OF THE IMMINEMT RETURN OF THE 22 AUXILIARY FEED PUMP (WHEN TAGS ARE REMOVED).
: 2. OSC TO NOTIFY THE SNSS OF THE PRO-GRESS ON THE FEED PUMP.
6.36
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM
* MESSAGE #:
TO FROM LOCATION 37 CR, OSC, TSC, EOF PLAYERS CR,OSC,TSC, EOF LEAD REFEREES SIMULATOR (SALEM), OSC, TSC, EOF REAL TIME DRILL TIME 13:45 05:45 MESSAGE FOR SCENARIO CONTROL THE SIMULATOR WILL BE FROZEN TO ALLOW A TIME ACCELERATION OF THIRTY HOURS. THE NEW TIME IS 20:15 HOURS ON JUNE 24 ,.1993 AND PLANT CONDITIONS ARE THE FOLLOWING:
* THIS IS A DRILL ! ! !                    *
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
* REFEREE NOTES :
: 1. THE OBJECTIVE OF THE TIME ACCELERATION IS TO ALLOW THE EMERGENCY COORDINATOR TO DEMONSTRATE EMERGENCY TERMINATION/REDUCTION.RECOVERY.
ACTIONS IN ACCORDANCE WITH EPIP-405.                                ,*::
: 2. IT IS ANTICIPATED THAT THE RECOVERY PLANNING WILL TAKE APPROXIMATE-LY AN HOUR AND A HALF.
EXPECTED ACTIONS :
: 1. ALL DRILL PLAYERS WILL BE GIVEN NEW INITIAL CONDITIONS FOR REVIEW.
: 2. ALL DRILL PARTICIPANTS TO REVIEW NEW DATA WHICH WILL BE RECEIVED AT 14:15 HOURS.
: 3. DISCUSSIONS ON METHODS OF RECOVERY TO COMMENCE *
* 6.37
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:  38                                REAL TIME  14:00 TO          STATE DRILL PARTICIPANTS          DRILL TIME  20:00 FROM        LEAD REFEREE LOCATION    EMERGENCY OPERATING FACILITY (EOF) AND STATE EOCs MESSAGE THE ATTACHED MESSAGES TO BE PROVIDED TO THE STATE DRILL PARTICIPANTS AT 14:00 HOURS.
* THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
REFEREE NOTES :
: 1. THESE MESSAGES SHOULD BE PROVIDED TO THE STATE DRILL PARTICIPANTS AT 14:00 HOURS WITH THE UNDERSTANDING THAT DRILL ACTIVITIES WILL RECOMMENCE AT 14:15 HOURS.
: 2. CONTINUE ACTIVATION OF ALL STATE FACILITIES IS NOT REQUIRED BY PSE&G HOWEVER THE STATE DIRECTORS SHOULD REMAIN AVAILABLE FOR COMMUNICATIONS.
EXPECTED ACTIONS :
: 1. STATE DIRECTOR TO DISCUSS EMERGENCY STATUS WITH ERM AND INFORM ERM THAT HE IS UNDER PRESSURE TO ALLOW CITI-ZENS TO RETURN HOME BUT IS WAITING FOR PSE&G TO INFORM THEM THAT CONDI-TIONS HAVE IMPROVED TO A POINT THAT PSE&G IS CONSIDERING RECOVERY.
6.38
* TO:
FROM:
TIME:
State of Delaware Drill Participants Delaware Referees 14:00 Hours It is now 20:15 on June 24,1993 and the following conditions exist:
Salem Unit Two status is as follows:
* Salem is still in a General Emergency.
* Long term Core Cooling has been established using the Residual Heat Removal System.
* All Steam Generators have been returned to normal levels and all Auxiliary Feed Pumps are available.
* Fuel Damage estimate indicate that the Reactor Core sustained 5-20% clad damage but NO fuel melting.
STATE OF DELAWARE STATUS:
* All Delaware Emergency Response Facilities remain in a full activation status .
*
* Field survey activities have been completed with NO readings above Background noted.
The State Director is reviewing Recovery/Re-entry Procedures but will take no action until the Utility decides that Recovery is warranted.
* The Governor is getting tremendous pressure to allow evacuated citizens back into their homes. He is looking for assurance from the Utility and from DEPO that it is safe.
* Press interest has dropped off somewhat but f ollowup stories are still ongoing *
* 6.38A
 
TO:
FROM:
State of New Jersey Drill Participants New Jersey Referees TIME: 14:00 Hours It is now 20:15 on June 24,1993 and the following conditions exist:
Salem Unit Two status is as follows:
* Salem is still in a General Emergency.
* Long term Core Cooling has been established using the Residual Heat Removal System.
* All Steam Generators have been returned to normal levels and all Auxiliary Feed Pumps are available.
* Fuel Damage estimates indicate that the Reactor Core sustained 5-20% clad damage but NO fuel melting.
STATE OF NEW JERSEY STATOS:
* All New Jersey Emergency Response Facilities remain in a full activation status.
* Field survey activities are still ongoing with NO readings
* above background noted. All analysis reveal samples at this time show NO readings above background.
* The State Director is receiving pressure from the Governor to let evacuated citizens back into their homes. The State Director is reviewing Recovery/Re-entry procedure bit is waiting for word from PSE&G that conditions have improved to the point that PSE&G is looking into recovery.
* Press interest has dropped off somewhat but f ollowup stories are still ongoing.
6.38B
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:    39                                REAL TIME        14:15 TO            CR, OSC, TSC, EOF PLAYERS          DRILL TIME      20:15 FROM          CR,OSC,TSC, EOF LEAD REFEREES LOCATION      SIMULATOR {SALEM), OSC, TSC, EOF MESSAGE SEE ATTACHED NEW INITIAL CONDITIONS.
* THIS IS A DRILL ! ! !                        *
*
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
REFEREE NOTES :                                            -- ~ -
: 1. THE OBJECTIVE OF THE TIME ACCELERATION IS TO ALLOW THE EMERGENCY COORDINATOR TO DEMONSTRATE EMERGENCY PLANNING ACTIONS IN ACCORDANCE WITH EPIP-405.
: 2. IT IS ANTICIPATED THAT THE RECOVERY PLANNING WILL TAKE APPROXIMATE-LY AN HOUR AND A HALF.
EXPECTED ACTIONS :
: 1. AFTER SOME DISCUSSION BY THE ERM WITH EOF STAFF, AND WITH THE PLANT STAB-ILIZED THE RECOVERY DETERMINATION CAN COMMENCE *
* 6.39
 
REFEREE INFORMATION - RECOVERY PLANNING (Appendix to Drill Message #39)
EXPECTIONS OF RECOVERY PLANNING:
: 1. The ERM in consultation with the EDO, should decide if termination, reduction or recovery is the correct way to proceed based on the plant condition.
Note: Based on plant conditions the correct choice is to commence recovery planning.
: 2. ERM should complete EC Recovery Checklist. All answers should be "YES".
: 3. ERM should direct a detailed Recovery Implementation review and when personnel have had time to access plant/emergency status, convene an Advisory Panel to review the results of the status review using procedure checklist for each area.
Note: Results should indicate that the plant is in a stable condition with adequate systems to keep the core cool and covered. Core Damage estimates indicate. some clad damage and plans to defuel the Reactor are under the watchful eye of the NRC and the World. It is expected that EOF operations can be terminated and that the TSC can act as the home base for the Recovery Team. The operation of
* the ENC in a reduced personnel status will probably continue for the next few days until media interest calms down.
: 4. ERM should obtain State and NRC concurrence.
: 5. ERM should develop and define a Recovery Management Organization.
* Note: RMO should include discussion of curtailment of full staff manning.
: 6. Obtain Concurrence from VPNO or the VP-CNO.
: 7. Completion of the "Emergency Termination/Reduction form is not required and would not occur until all were called in and the Recovery Organization was in place.
NOTE: steps 4 through 6 may not be demonstrated dependent on time to demonstrate Items 1, 2, and 3.
NOTE: Continued on next Page 6.39A
 
REFEREE INFORMATION - RECOVERY PLANNING
* Other Facilities: In General, what should be happening?
TSC - In an actual emergency and in this drill the TSC should be working directly with their EOF counterparts to help the EOF complete their checklist.
RP in the TSC should continue to access inplant Rad conditions to include rad levels in the plant and within the owner controlled Area. Admin. to assist EOF admin with the creation and simulated notification of Recovery team personnel.
osc - In an actual emergency they would continue working on assignments that the SNSS had provided and catch up on any paperwork that may not have been completed during the heat of the battle. In addition they would assist the TSC with any plant repair estimates or equipment status.
For this drill the osc will not participate in the recovery process but the lead referee will remain available to answer questions from the TSC or Control Room to support recovery.
CP - In an actual emergency during recovery planning the Control Point would be providing the TSC with inplant radiological survey data as well as continuing to support osc teams sent into the plant. In addition, the Chemistry personnel would continue to .obtain samples to better analyze core and/or containment conditions.
* For this drill the CP will not participate in the recovery process but the lead referee will remain available to interface with the TSC as needed.
ENC - In an actual emergency during recovery planning the ENC Manager would.be tasked with the* completion of Appendix 5 of EPIP-405. This "Recovery Planning Checklist", would then be used to brief the ERM and his leads during their meeting concerning the decision to implement Recovery.
* For this drill the ENC Manager and lead ENC referee only will continue to participate during the Recovery decision process.
CONTROL ROOM - In an actual emergency during recovery planning the SNSS would continue to direct plant operations and assign osc tasks as needed. He would also brief the TSC on the operational condition of the plant and may request long term guidance on what plant configuration the plant should be placed in such as:
(Refuel, Draindown, Fill & Vent, Restart, etc). For this drill the Control Room will not participate in the recovery process. The Simulator lead referee will remain available to interface with the TSC as needed to support recovery planning.
6.39B
 
OPERATIONAL CONDITIONS AS OF 20:15, 06/24/93 Hope Creek remains at 100% power.
Salem Unit 1 startup is on hold due to the Unit 2 emergency.
Salem Unit 2 remains in a General Emergency with the plant status as follows:
Norm.al Residual Heat Removal is in service providing core cooling.
Repairs have been completed on all aux feed pumps and they are all available if needed. All Steam Generator levels are on program.
All tanks have been topped off, (Demin, Aux feed, Rx water)
Both Safety Injection Pumps are tagged IAW IOP-6.
Both Containment Spray pumps are tagged IAW IOP-6.
Charging Pumps #22 and #23 are tagged IAW IOP-6 and repairs to #23 charging pump are in progress.
RHR valves 2RH1 & 2RH2 are tagged IAW IOP-6.
Containment Fan coil Unit #25 is still out of service.
Repairs to Boric Acid Transfer Pump #22 have been completed.
The last PASS sample results indicate an RCS activity of 309 uci/gm Dose Equivalent Iodine as of the sample time of 1800 hours today. This activity value exceeds ECG section SC.
The Nuclear Fuel Engineer in the TSC has estimated that during yesterdays transients, 5-20% of the clad was damaged.
* Initial Investigation into the ATWT yesterday has discovered two problem areas that are suspected as the cause:
: a. the reactor trip breakers that were changed out in the last outage both had loose terminal connections causing the shunt trip device to not function as designed.
: b. The UV trip mechanism failed to trip open the breaker due to improper lubrication.
6.39C
 
OPERATIONAL CONDITIONS AS OF 20:15, 06/24/93 Breaker 2E6D failure was due to a faulty auxiliaries switch (SA-52). This fault prevented the spring charging motor from compressing the trip springs. The breaker is now repaired.
The f eedwater line break was located downstream of the feed pump discharge valves on a pipe weld. Corrective actions have not yet started.
The failure of the overhead annunciators was found by the vendor this morning. A fault in the 12V power supply on the RS232 controller was the cause of the failure. Repairs have been completed and the system tested satisfactory.
The annunciators were returned to service at llam this morning .
 
RADIOLOGICAL CONDITIONS AS OF 20:15, 06/24/93 The site has been surveyed by both direct frisk and by smears. The
* results showed no deposition on the ground from the release.
Maplewood Labs has taken samples from both onsite and Offsite. The analysis results from these samples show no activity above normal background. Sampling of both Onsi te and Offsi te is still ongoing.
2R24A (Seal Water Injection Filter) is reading 2.72E+OS mR/hr and is still in ALARM.
2R25 (Seal Water Filter) is reading 2.72E+OS mR/hr_and is still in ALARM.
2R26 (Reactor Coolant Filter)    is reading 2. 72E+os mR/hr and is still in ALARM.
2R31 (Fail Fuel Letdown) is reading 7.04E+os cpm and is still in ALARM.
2R2, 2R7, 2R10A & 2R10B are reading 7.74E-01 mR/hr. and have not gone into any alarms during the last 30 hours.
2R47 (Electrical Pen General Area ARM) is reading 1.6 mR/hr due to the PASS line in the overhead. The PASS line in the overhead is reading 2.3 R/hr. on contact. This monitor has not gone into any
* alarms in the last 30 hours.
All other RMS indications are within normal parameters.
survey results of the Auxiliary Building indicate all radiological conditions are within normal parameters except the area by #21 Gas Decay Tank on 64' Elevation.
The survey results of the area on 64 1 Elevation by #21 Gas Decay Holdup Tank was found to be 9,000 ccpm. The area has been posted a contamination Area.
survey results of containment, excluding the Bioshield and the PASS lines, indicate all radiological conditions are within normal parameters.
survey results of the Bioshield show some areas have dose rates 3 to 4 times higher then normal. The higher than normal dose rates are thought to be caused from the cladding damaqe of the fuel.
The PASS lines are reading 2 to 3 R/hr. on contact.
No leaks of any type were found inside containment or in the Auxiliary Building.
to. 31 E
* ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:    40                                REAL TIME  15:30 TO            DUTY SNSS (SALEM & HOPE CREEK) DRILL TIME      21:30 FROM          CONTROL ROOM DRILL CONTROLLER LOCATION      CONTROL ROOM ( SALEM & HOPE CREEK STATIONS)
MESSAGE PLEASE MAKE THE FOLLOWING PAGE ANNOUNCEMENT:
          "ATTENTION ALL PERSONNEL. ATTENTION ALL PERSONNEL."
          "TODAY'S EMERGENCY PLAN DRILL HAS BEEN TERMINATED."
PLEASE REPEAT MESSAGE ONE TIME.
* THIS IS A DRILL ! ! !                      *
*
* DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
REFEREE NOTES :
: 1. PROVIDE THIS MESSAGE TO THE DUTY SNSS ONLY WHEN AUTHORIZED BY THE HEAD REFEREE (TIME ABOVE IS APPROXIMATE).
: 2. ENSURE THAT THE CONTROL NETS PHONES AND STATION RADIO ARE RETURNED TO NORMAL AFTER THE DRILL IS TERMINATED.
: 3. PROVIDE ANY COMMENTS CONCERNING THE DRILL TO THE HEAD REFEREE IN THE TSC AFTER ENSURING CONTROL ROOM COMMUNICATIONS SYSTEMS ARE RE-STORED.
EXPECTED ACTIONS :
: 1. AFTER THE SNSS AND EDO AGREE THAT THE PLANT IS STABLE, HEAD REFEREE WILL TERMINATE DRILL WITH NRC CON-CURRENCE.
: 2. LEAD REFEREES SHALL ENSURE THEIR FACILITY IS RESTORED TO NORMAL READY CONDITIONS.
: 3. NCO AT SALEM AND HOPE CREEK MAKES PAGE ANNOUNCEMENT *
* 6.40
 
ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE #:    41                                  REAL TIME  15:45 TO            LEAD REFEREES                      DRILL TIME  OVER FROM          HEAD REFEREE LOCATION      ALL FACILITIES MESSAGE THIS MESSAGE IS A REMINDER TO THE LEAD REFEREES TO REVIEW THE DRILL SYNOPSIS ATTACHED WITH THE PLAYERS IN ORDER TO AVOID NEGATIVE TRAIN-ING BY EXPLAINING;
* DATA INCONSISTENCIES,
* POSTULATED FAULTS AND CIRCUMSTANCES THAT ARE BEYOND DESIGN BASIS,
* CONDITIONS THAT WERE .UNKNOWN TO THE PLAYERS, EITHER INTENTIONALLY TRANSPARENT OR SIMPLY UNRECOGNIZED,
* BIG PICTURE ITEMS.
THIS IS A DRILL ! ! !
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS !!!
REFEREE NOTES
: 1. REVIEW THE ATTACHED INFORMATION WITH THE PLAYERS.
EXPECTED ACTIONS :
: 1. REVIEW THE EXERCISE AND COMMENCE CRITIQUE.
6.41
 
Attachment to MESSAGE # 41
* DRILL OVERVIEW:
POST DRILL SCENARIO SYNOPSIS FOR PLAYER DEBRIEFING & CRITIQUE Drill began with an Alert classification based a loss of all overhead Annunciators for greater than 15 minutes.
During the Alert a Gas Decay Tank leak results in a Radio-active release that is below Technical Specification limits.
The release lasted approximately one hour.
* Later a catastrophic failure of a main f eedwater line occurs at the discharge of the Steam Generator Feed Pumps. The steam Generator Feed Pumps trip on low suction pressure, as they increase in speed to maintain discharge pressure. An automatic reactor trip signal is generated from steam Generator FLOW MISMATCH coincident with LOW LEVEL. The Reactor auto trip fails, and subsequent attempts at a manual trip fails until operators are dispatched to open the Reactor Trip. Breakers.
During the Anticipated Transient Without Trip, Reactor Coolant System pressure rapidly increases due to the Insurge into the Pressurizer. Both Pressurizer Power Operated Relief Valves and All Pressurizer Safety Valves open. Pressurizer Safety Valve 2PR3 fails to reset until Reactor Coolant System Pressure decreases to approximately 1300 PSIG. This results in exceeding the Limiting Safety System Setpoint for Overtemperature Differential-Temperature and a loss of Subcooling at power with postulated Departure from Nucleate Boiling and Fuel Damage. This plant transient that is in progress along with the loss of the Overhead Annunciators is the basis for the site Area Emerqency.
The Anticipated Transient Without Trip along with several common-mode failures places the plant in a beyond design basis configuration for the purposes of the drill. As noted in the UFSAR Chapter 15.5, the Anticipated Transient Without Trip (ATWT) is alone considered outside design basis. The combination of the LOSS OF MAIN FEED induced ATWT and the Pressurizer Safety Valve failing to close result in being at power with no Reactor Coolant Subcooling Margin.
For purposes of the drill, the mechanism for Reactor core Fuel Damage will be exceeding the overtemperature Differential-Temperature Limiting Safety System Setpoint during an Anticipated Transient Without Trip This trip setpoint is to protect the Fuel from exceeding the Departure from Nucleate Boiling Ratio (DNBR) of 1.3.
 
Attachment to MESSAGE # 41 While exceeding  this trip setpoint without a Reactor Trip does not ensure  fuel damage, it is reasonable to assume that continued power  operation while exceeding the Limiting Safety system Setpoint  (LSSS) could result in fuel damage.
In order to support the radiological data the scenario had to show approximately 15% clad failure (no melting) .
During attempts to shutdown the reactor in EOP-TRIP-1 and FRSM-1, #23 Auxiliary Feed Pump trips on overspeed. This is recovered by an osc team. Later 22 Auxiliary Feed Pump fails, leaving only the TURBINE DRIVEN Auxiliary Feed pump (23) to supply the Steam Generators. Approximately thirty minutes later the turbine driven Auxiliary Feed Pump will fail resulting in the total loss of Feedwater and the Steam Generator levels begin to decrease.
As a result of the Transient Initiated By Loss Of Feed And Condensate followed by a failure of Auxiliary Feed for an extended period, a General Emergency is declared.
There is no Containment failure, the only Radioactive release was at the beginning of the exercise when the problem with the Gas Decay tank occurred.
Once the General Emergency is declared and #23 Auxiliary Feed
* Pump is returned to service the Simulator will be FROZEN. The purpose is to re-initiate the scenario after a 30 hour time acceleration near the end of the exercise. This will allow a demonstration of the implementation of Recovery Planning Actions by the. Emergency Response Manager.
REACTOR TRIP FAILURE Although the probability of common mode failure has been greatly reduced by the inclusion of the Reactor Trip Breakers in the Preventive Maintenance Program, we are postulating the following common mode failures of the Reactor Trip Breaker Switchgear:
Shunt Trip circuit During pre-startup test activities coming out of the refueling outage, both the "A" and "B" Reactor Trip Breakers were replaced. During the installation process, terminal connections for the shunt trip circuit had become loose, and eventually caused an intermittent open circuit. Upon trip demand, the circuits failed, and the shunt trip was ineffective.
 
Attachment to MESSAGE # 41
* Undervoltage (UV) Trip The breaker installation project performed during pre-startup began at 2100 hours, and did not conclude until 1030 hours the next day. During the shift change, it was communicated to the on-cominig maintenance team the lubrication with molybdenum disulfide (Molykote G) had yet to be preformed.
Due to a dirt-contaminated check-off list, the oncoming crew believed lubrication had been completed, and installed the breaker. Upon trip demand, the lack of lubrication to the UV mechanism caused excessive friction, and the mechanism failed to open the breaker.
Breaker 2E6D During the last refueling outage, the pressurizer heater bus was removed from service for preventative maintenance. When the bus was restored, breaker 2E6D was racked in and closed.
Unknown to the Equipment Operator, the station auxiliaries switch (SA-52) did not completely mate, and the spring charging motor failed to compress the trip springs after closure. When the breaker open signal was demanded, the breaker failed to open
* SECTION 7.0
* ARTIFICIAL ISLAND ANNUAL EXERCISE 1993 SUPPLEMENTAL SCENARIOS INITIAL  SUCCESS BLDG/      REFEREE SCENARIO #                        TIME          ?  ELEV.        NAME 7.01  OVERHEAD ANNUNCIATORS      08:05      NO    C.R. /122 (MAINT. CONT.)
7.02  PZR. LVL CHANNEL 3.        08:10      NO    C.R./122 (MAINT. CONT.)
i.
7.03  21 GAS DECAY TANK          09: 20    YES  AB/64 (OPS. /MECH.)
7.04  MAIN FEEDLINE FAIL.        10:30    YES    TB/100 (OPS. /MECH.)
7.05  INJURED MAN                10:35    YES    TB/100 (SITE PROT.)
7.06 ROD DRIVE MG. SET          10:35    YES    AB/84 (OPS.)                                      SW.GEAR 7.07A 23 AUX. FEED PUMP          10:30    YES    AB/84
{OPS.)
7.07  23 AUX. FEED PUMP          12:00    YES    AB/84 (OPS. /MECH.)
7.08  22 AUX. FEED PUMP          11: 30    YES    AB/84 (OPS./ELECT.)                                AB/64
 
ARTIF:C!AL :SI.A.ND EMERGENCY PI.AN JSC :'EAM ACT:::::...~IT!ES STA.."'lDARD DRILL OBJECTI"'1ES
*  ?.EFE?..ENCE E?!P 202:
  ?or each team    ~ha~  :s dispa~c~ed,    the osc Staff should      demons~ra~e the following:
: l. A thoroucrh briefing, including:
a) Team makeup,  designa~ion    (leader, code name or number) b) Team mission or  objec~ives    (primary and secondary}
c) Hazards to  anticipa~e    (radiological or      environmen~al) d) Special instructions (best route to destination, tools needed, procedures, protective clothing, exposure limits, etc.)
e) Communications established (phone numbers for calling the OSC, radios in hand and operability checked, etc.)
f) Emergency Exposure Authorizations obtained, if needed.
g} Abort: criteria for mission or check points, if a change in mission or objec~ives is determined necessary.
* 2. Radiological support provided is adequate to protect team members from anticipated hazards. (i.e. Rad Tech and survey meter taking the lead, checking with the referee periodically for dose rates)
: 3. Team arrives at the right destination in a timely manner and is properly equipped to perform tasks assignedo tools, keys, proper dosimetry, etc.)
(procedures, diagrams,
: 4. Team leader keeps the osc informed, responds well to changing conditions including a revision to the mission (if needed) based on new information or escalating emergency conditions.                        * *
: 5. osc Staff supports teams by tracking their location and status.                  They provide additional resources as needed.            (obtain parts, diagrams, Engineering expertise, etc.)
: 6. A thorough debriefing cf mission results, ether observations while in the field, etc *
* 7.0.1
 
OSC COORDINATOR CHECK LIST (CONTINUOUS)
~EFEP.ENCE
: l. osc EPIP 202:
          ~ersonnel are assembled and facility set up is complete.
Staffing is adequate (numbers, available expertise)
Personnel are fed, rested, prepared to respond Reliefs are being arranged Fire Dept/Medical Response personnel reporting to osc
* Accountability is maintained (when needed)
* Emergency exposure cons~nt obtained from volunteers
: 2. osc personnel are briefed periodically on (as a minimum):
Plant status Emergency classification status Emergency Coordinator (EC) turnover osc team priorities (per SNSS)
Radiological release status (per RPS)
J. osc facility habitability is monitored and maintained safe:
* HVAC operating properly
* SOP and frisker set up (if needed)
* Security access controlled (if needed)
: 4. SNSS is briefed periodically on team status:
Missions ongoing, team locations, problems encountered, etc.
Tasks accomplished Priorities consistent with current plant status Emergency Exposur.e Authorizations.* obtained
: 5. osc facility resources are adequate:
communications systems operable Procedures are available (inventory, multiple working copies are prepared when needed)
* Status boards and logs are being maintained 7.0.2
 
DRILL REFEREE'S DOSE RATE - SRO DOSE CF.ART JOSE ?.ATE              DOSE            DOSE P..ATE              DOSE mRem          mRem                      mRem            mRem
:nR/hr    1 minu~e      5 minu~es      R/hr      1 minu~e        5 minu~e!::
50            1              5        1            20                lOC 100            2              10        2            30                l5C 150            3              15        2.5          40                20C 200            3              15        3            50                25C 250            4              20        4            70                35C 300            5              25        5            80                40(
350            6              30      10            170                asc 400            7              35      20            300              lSOC 450            8              40      30            500              250C 500            8              40      40            700              350(
550            9              45      50            800              400(
600          10              50      60            1000              500(
650          ll              55      70          1200              600C 700            12              60      80          1300              700<
750          13              65      90            1500              750<
800            lJ              65      100            1700              8501 850            14              70      200          3300              l7R 900          15              75      300          SR                25R 950            16              80      400          7R                JSR 1000            20            100      500          SR                40R
* (AREA DOSE RATE)
(SRO/
AI.NOR READINGS)
REFEREE'S NO'l'E:
(AREA DOSE RATE}
(SRO/
ALNOR READINGS)
THE TABLE ABOVE IS FOR MAKING "QUICK" APPROXIMATION OF TEAM MEMBER DOSES RECEIVED (SRO OR AI.NOR READINGS) WHEN CHECKED BY PLAYEBS.
ALL READINGS ARE INTENTIONALLY ROUNDED, BUT ARE WITHIN ACCEPTABLE DEVIATION OF CALCULATED VALUES GIVEN NORMAL VARIAT:CONS IN DOSE RATE~
GEOMETRY, ACCURACY OF SRDs, AND OF COURSE READING PRECISION.
* KNOW THE ALARM SETTING ON THE ALNORs USED BY THE TEAM MEMBERS YOU AJ CONTROLLING. GIVE THE PLAYERS AN AUDIBLE ALABM WHEN THAT DOSE WOULD HAVE BEEN RECEIVED.
* KNOW ALSO ANY PRIOR ACCOMULATED DOSE (SIMULATED} THAT THE PLAYERS MJ HAVE RECEIVED ON EARLIER MISSIONS
* 7.0.3
* TITLE START TIME  08:05 SUPPLEMENTAL SCENARIO# 7.01 OVERHEAD ANNUNCIATORS FAILURE END TIME  14:15 (2015)
LOCATION    CRT/KEYPAD (2CC1 EXTENSION) OPERATION OP. PANEL CABINET 115-2. RACK ROOM A. INITIATING CONDITIONS:
AT 8:05 ONE OF THE.CONTROLLERS (RS232) HAS FAILED. A FAULT HAS OCCURRED BETWEEN +12VDC AND GROUND.
B. RELATED MESSAGE FORMS:  03 & 05D
* C. POSTULATED EVENT:
: 1) FAILURE MODE (OR CAUSE):
A FAULT HAS OCCURRED BETWEEN +12VDC AND GROUND. THE WINDOW BOXES CAN NO LONGER UPDATE, THE COMMUNICATION PATH TO WIN-*
DOW BOX A-9 WILL BLOCK THE ALARM. NO ALARMS WILL BE DIS-PLAYED ON THE CRT, THE TIME WILL STOP UPDATING ON THE CON-SOLE CRT, AND THE PATH TO THE ALARM PRINTER IS DISABLED AND THE PATH TO THE REMOTE CONTROL WORK STATION (RCW) IS ALSO DISABLED.
: 2) SYMPTOMS (OR INDICATIONS):
THE CLOCK FOR THE OVERHEAD ANNUNCIATORS ON THE CRT IS NOT UPDATING *
* 1.01.1
 
SUPPLEMENTAL SCENARIO # 7.01 (CONTINUED)
C. POSTULATED EVENT:
: 3) RESTORATION GUIDELINES:
ALL ATTEMPTS BY THE OPERATING SHIFT AND THE MAINTENANCE CONTROLS DEPARTMENT TO DIAGNOSE THE PROBLEMS ARE UNSUCCESS-FUL. THE OFFSITE VENDOR WILL BE NEEDED TO RETURN THE ANNUN-CIATORS TO AN OPERABLE STATUS.
: 4) SCENARIO CONTROLS:
THE OVERHEAD ANNUNCIATORS CAN NOT BE RESTORED UNTIL SOME TIME AFTER THE VENDOR IS CALLED AND ARRIVES ONSITE TO DIAGNOSE THE PROBLEM WITH THE CENTRAL PROCESSING UNIT FUNCTION. THE ANNUNCIATORS WILL BE RESTORED TO SERVICE AFTER THE SCENARIO TIME ACCELERATION AT 14:15 HOURS.
D. RADIOLOGICAL CONCERNS:
NONE *.
E. ATTACHMENTS:
: 1. REFEREE TO BE PROVIDED WITH MARKED UP EROCEDURES.
: 2. S2.0P-AB.ANN-0001(Q) LOSS OF OVERHEAD ANNUNCIATOR SYSTEM AND S2.0P-SO.ANN-0001(Q) OVERHEAD ANNUNCIATOR OPERATION.
: 3. MARKED UP FAILURE MODE ATTACHMENT.
F. CONTROLLERS SPECIAL NOTES / REFERENCES / OBJECTIVES:
: 1. THIS SCENARIO IS THE PRECURSOR TO THE ALERT CLASSIFICA-TION. THE ANNUNCIATORS MUST BE INOPERABLE FOR GREATER THAN 15 MINUTES.
: 2. ALLOW SOME FREE PLAY DURING THIS SCENARIO, AND OBSERVE TROUBLESHOOTING DIAGNOSTICS.
: 3. RETURN WILL BE AT 14:15 HOURS.
1.01.2
 
rr>
I 15.00
                                                                                                                                                                                                            =
                                                                                                                                                                                                            ...-1
                                                                                                                                                                                                            ~
                                                                                                                                                          =
0 t1
                                                                                                                                                                                  ...                              r~
                                                                                                                                                                                                        ~I ..      ... "'t L
                                                                                                                                                          ===-
Pl oo - - - - - - - - - - - - - - " "
: r. .
                                                        ~&#xa3;~                                r.:::-::r-,--.--r,~y--,.-::-:-::-:-:-=-----r---------....,.....-----1'&deg; I 9.
REf -        - -                    14      eo9<0~1-001 WIRJNG 01""e.. s.~. PWR riurrues :g
                                                                                              -  RE.f    -                  -  I~      B090l0i>-OOI            WIRltJG DIAG. S.E.!t,. PWR. SUPPLIES tJores:                                                                                          l      -                -    11      809314-002              SUBASSY, PW/l. SUP. (PS7 t PSe f
& USt ITEM.S 5 '6  WITH RUt:RENCE.        77:J 1TJ:M 7.                                      l. l.    -                -    II      809~14-00/              SUBASSY. PWR. SUP. 7PSI &#xa3; PS1.. '
&#xa3; PtvR A f PWR B    MAV BE  100    ro    250 VOLT.S Ac Oli' DC.
ll4F a
                                                                                                                            .2 ID 9
IJ I>
8085'5 - ool so' 75 I - 001 W14'1NG ~46., SEii PW'I 511/!IPLIES -
                                                                                                                                                                  .SCIOA.S~f, tOCflC PW!{ SUP (P:JI, P.StJ POSITIVE OR  HOT SHOULD B&#xa3;    ('(),V,(/ECTcO To
&  CONTACT OPENS ON PWR FAIL -DOI ~ -OO'l.
CDNTllCT CLOSES ON PWR FA//... -003 &#xa2;-004, A{ ,: :; ,-: .r.J~,: .;7                        D  801. 15 2 - OD/          tt/l.fi'ING Dl~t5.,  5.E.ff. PW~ .SUPPLIES
: 4. -001 ~ -002 ASSY, SV::: 5A
    -003 ~ -004 ASSYJ 5V =14A l.1.l 2 41 I
                                                                                                  ;;J I    1              1 112058-002.
llZ04Z.
11003s-012
                                                                                                                                                      -ooJ TE-E>MINAL,          MALE C'OAl.41., IZ PIJ.5, PLtltS (Pl,Pt.PJ P4J T~~M1NAL a1.0CK. 12Pr.            (TB2)
I I
I I    z      / / (J{) 3 s - ao"        T~~Mllt/Al ISLoCI(,. 8 PT. (rtJJ) uo+
I OOJ I    I I
                                                                                                          .........,,,,....oat I
n1*
                                                                                                                                    .P z:r        ..........
80l> 754- 001 LIU Of IUUll&L CHA.SSl.S, PW/'t .StJPPL'i'
                                                            "'  i    :
1011 Ma*INlll D... CAllRCLLIDN, Tl. 11011
 
                                                                            -=-
Plfl/14AttY'
{~,I                  8          DS2 Cl
                                                                                          "~
5
                                                                                            ~            l*c1
              ~i.-----._-_-_ -p_A C.fl        Clf~
R/1'
{                -----<>-
                                                                                                ~
                                                                                                ... ***~ *-=-~
II c11a                                        lf6 112. v 0-tt                                                            ...........
{
  #/211                                                  .5 VOLT ch
(      "?    111 f'Uu                                                                                                                  t:~r Cl" ,,.
l F        *H                                                                        :. 1          l.~,
cir I
Ill R.I.
II y                          ~''"      ~ .
10                                "'                  .,
SIJ.I *11T P.5.f 0111 *o,,.,          ,,  .fSIJI IN B                                                        .......... Liii OP IHIHIAL A
Hll llcUNlll D*. C&HOLLIDll, II. UHi I ,J
* TITLE START TIME  08:10 SUPPLEMENTAL SCENARIO# 7.02 PRESSURIZER LEVEL FAILURE CHANNEL 3 END TIME  10:00 LOCATION    EQUIPMENT RACKS BEHIND THE CONTROL ROOM CABINET A. INITIATING CONDITIONS:
PRESSURIZER LEVEL CHANNEL HAS FAILED LOW.
B. RELATED MESSAGE FORMS:  OSD & 11
* C. POSTULATED EVENT:
: 1) FAILURE MODE (OR CAUSE):
THE SUMMATOR IN THE PRESSURIZER LEVEL CIRCUITRY HAS FAILED.
: 2) SYMPTOMS (OR INDICATIONS):
CONTROL CONSOLE INDICATION FOR PRESSURIZER CHANNEL 3 AT ZERO. CONTROL AND BACKUP HEATERS HAVE TRIPPED. THE GREEN BEZEL LIGHTS ARE FLASHING. LETDOWN ON THE CONTROL CONSOLE IS LOST. THE CHARGING FLOW ON THE CONTROL CONSOLE IS INDI-CATING MAXIMUM. THE BEZEL ALARM ON THE CONTROL CONSOLE FOR THE PRESSURIZER LEVEL LOW IS ENERGIZED. (YELLOW LIGHT) *
* 7.02.1
 
SUPPLEMENTAL SCENARIO# 7.02 (CONTINUED)
C. POSTULATED EVENT:
: 3) RESTORATION GUIDELINES:
THE CHANNEL WILL HAVE TO BE TAKEN OUT OF SERVICE AND THE INSTRUMENTS CONTROL TECHNICAN WILL HAVE TO REPLACE THE FAILED PARTS.
: 4) SCENARIO CONTROLS:
THIS SUPPLEMENTAL IS USED TO AID THE OPERATORS IN THE IDENTIFICATION OF THE LOSS OF THE ANNUNCIATOR SYSTEM. THERE WILL BE NO OVERHEADS ILLUMINATED ONLY CONSOLE ALARMS AND INDICATIONS.
THIS SHOULD LEAD THE OPERATOR TO NOTICE.THAT THE CLOCK ON THE CONSOLE CRT IS NOT UPDATING THE TIME CORRECTLY.
NO REPLACEMENT PARTS WILL BE AVAILABLE IN THE STOREROOM.
D. RADIOLOGICAL CONCERNS:
NONE.
E. ATTACHMENTS:
F. CONTROLLERS SPECIAL NOTES / REFERENCES / OBJECTIVES:
: 1. THIS SUPPLEMENTAL SCENARIO WILL BE SUCCESSFUL.
: 2. THIS FAILURE WILL CONFIRM THE LOSS OF THE ANNUNCIATOR SYSTEM.
: 3. AFTER 15 MINUTES THE SNSS SHOULD DECLARE AN ALERT.
: 4. NO TRANSIENTS WILL TAKE PLACE DURING THIS SUPPLEMENTAL.
1.02.2
* TITLE START TIME SUPPLEMENTAL SCENARIO # 7.03 21 GAS DECAY TANK LEAK 09:20                                END TIME  10:15 LOCATION      GAS DECAY TANK VALVE ROOM. AUXILIARY BUILDING ELEV. 64 1 A. INITIATING CONDITIONS:
A 3/4 INCH LINE FEEDING A PRESSURE TAP FROM 21 GAS DECAY TANK IS LEAKING.
B. RELATED MESSAGE FORMS:    OSR, 09C, 10, & 13C
* C. POSTULATED EVENT:
: 1) FAILURE MODE (OR CAUSE):
THE SMALL 3/4 INCH PRESSURE TAP GOING TO THE PRESSURE DEVICE FOR 21 GAS DECAY TANK HAS SPLIT OPEN AND LEAKING INTO THE GAS DECAY TANK VALVE ROOM.
: 2) SYMPTOMS (OR INDICATIONS):
GAS DECAY TANK PRESSURE RAPIDILY DECREASES TO 50% AS INDI-CATED ON THE 2RP1 PANEL IN THE CONTROL ROOM.
WHEN THE OSC TEAM ARRIVES THEY WILL HEAR A HISSING NOISE.
NOTE: OVERHEAD ANNUNCIATORS ARE NOT OPERABLE, THEREFORE NO ALARMS FROM THE 104 PANEL WILL BE RECEIVED IN THE CONTROL ROOM *
* 7.03.1
 
SUPPLEMENTAL SCENARIO # 7.03 (CONTINUED)
C. POSTULATED EVENT:
: 3) RESTORATION GUIDELINES:
THE LEAK FROM THE GAS DECAY TANK MUST BE STOPPED BY CLOS-ING THE PRESSURE TAP ISOLATION VALVE 21WG32. THIS VALVE FEEDS PT-1036 THE PRESSURE TAP FOR THE GAS DECAY TANK.
THIS ACTIVITY SHOULD LAST APPROXIMATELY ONE HOUR.
THE ROOT VALVE 21WG32 IS BEFORE THE GAS DECAY TANK INLET VALVE (21WG31). THIS VALVE IS NOT IN THE GAS DECAY TANK ROOM, BUT IN THE ROOM WHERE ALL THE VALVING IS ACCOMPLISHED TO ISOLATE/ DISCHARGE THE GAS DECAY TANKS TO.THE PLANT VENT
: 4) SCENARIO CONTROLS:
THIS ACTIVITY TO BE SUCCESSFUL. THE OSC REFEREE WILL NEED TO PROVIDE RADIATION DATA WHEN ASKED. THE GAS RELEASE TO THE AUXILIARY BUILDING WILL BE TERMINATED WHEN THE ROOT VALVE IS CLOSED. IF RPT IS DISPATCHED WITHOUT PC's TO IN-VESTIGATE RAD LEVELS IN THE AUX. BLDG. HE WILL BE CONTAMI-NATED TO A LEVEL OF 25,000 CPM AND WILL REQUIRE A HALF HOUR DECAY TIME BEFORE HE IS CLEAN.
REFEREE SHOULD CHECK MESSAGE # 13C.
D. RADIOLOGICAL CONCERNS:
CONTAMINATION LEVELS IF PC's AND RESPIRATORS ARE NOT USED:
25,000 CPM 250,000 DPM E. ATTACHMENTS:
: 1. AUXILIARY BUILDING FLOOR PLAN ELEVATION 64 1 *
: 2. GASEOUS WASTE SYSTEM SIMPLIFIED DRAWING.
F. CONTROLLERS SPECIAL NOTES / REFERENCES / OBJECTIVES:
: 1. REFEREE MUST ENSURE THAT MESSAGE # 13C IS COMPLETED AT 10:15 HOURS.
7.03.2
 
UNIT TWO
*                          ~                                _Qi AUX BUILDING 64' EL I                      I  111    . :'--*r  --
R1i
:::ADIOLCG;c;..~    : .FORMATION
::.ATE OF DRILL:        _'JNE 22. 1993 w    ,,--.
I
                                        ,/i;22'\            ~21 &deg;\
::.RILL -:-:~AE(S) . :::.aoo -    ::ND eves          eves    I CJ        I I
MONITOR I \ MONITOR I
                                      \ TANK /            TANK/
I
:t21
                                                        -----                          ~EAL T:~.lE(S)    : *:::300 -    ~ND
                                    ../ASTE i...;DLD-UP      T i~.~~K 111 i1 !I.
                                                                                      ;.1R SAMPLE Qr\TA : s:::E GENERAL AREA AUX BUILDING AIR DAT.A
                                                                                        " SEE LEAK LOCATIO:l 251                                            ATMOSPHERE CONCENTRATIONS r.
L.!
t*22 AMS READINGS: 400CCPM
                                    ../ASTE
        ;;21
  ..,iASTE .::::;,.:,s        HOLD-UP TANK                                            0    AMS    CCONTINUOUS AIR MONITOR)
:JMPRE~::R                            00                    2R27
* CONTAMINATION LEVELS: N/A PACK I    ~              KU
                                          **2 V ASTE MONITOR                                            ASTERISK ( *) AREAS WILL HAVE THE HOLD-UP TANK                    0                      FOLLOWING DOSE RATES fill]
CLOSED
                                                  *~*
:RILL      ~EAL      '.:?EN
                              -~                                                        TTME      TTME      './INDOV            VINDCV
                                                      ~
0120      0920      5.50 R/HR          4.50 R/HR 0130      0930      6.25 R/HR          5.00 R/HR 0145      J945      6.00 R/HR          4.80 R/HR 0200      :ooo      5.60 R/HR          4.50 R/HR 625 MR/HR          500 MR/HF
[TI]        0215 0230
                                                                                                  ;,01s 1030      .;2.5 MiUHR        50.0 MR/H 0245      1045      <LO MR/HR          <1.0 MR/HF lo        DOSE RATES IN MR/HR UNLESS
                                                                                      ~
OTHERWISE INDICATED.
      ~ 1t21 eves HOLD-UP lrarJ TANK
                                                      ~
      ~ 1*22 eves HOLD-UP mt TANK
                                                      ~                      [TI
      ~                                              ~
CI 1*23      eves HOLD-UP TANK CI lillli                                    0            Cl do      NCIHUIJ!i 7.03.3
 
    *                                      *                            *  ~
a
* t.
WHleOH                                  I:'>
ComprHIOf Package He cycle                  2W041 loGH Analyzer          2W037 ttUT Recycle lo Waste Oaa 2WO 38 Compressor Package Recycle to Cha No.23        No.24 Analyzer    .21W042          23W04Z    Gal  24W04~  0811 HP N 2
Decay        Decay Tank        "Tank SAT HUT
 
** TITLE SUPPLEMENTAL SCENARIO # 7.04 MAIN FEED LINE FAILURE DAMAGE ASSESSMENT START TIME  10:30                                END TIME    11:30 LOCATION    UNIT 2 100 1 ELEV TURBINE BLDG A. INITIATING CONDITIONS:
FAILURE OF AN UNIDENTIFIED WEAKENED WELD ON THE 20 11 FEED WATER HEADER, DOWN STREAM OF THE STEAM GENERATOR FEED PUMP DISCHARGE VALVES.
I I
I
                                                                        -1 B. RELATED MESSAGE FORMS:  lSD
* C. POSTULATED EVENT:
: 1) FAILURE MODE (OR CAUSE):
CATASTROPHIC WELD FAILURE ON THE STEAM GENERATOR FEED PUMP COMMON DISCHARGE HEADER.
: 2) SYMPTOMS (OR INDICATIONS):
ALL ELEVATIONS OF THE TURBINE BLDG ARE FULL OF STEAM.
THE AIR IS HUMID AND THE SOUND OF RUSHING STEAM CAN BE HEAR THROUGH OUT THE TURBINE BUILDING.
BOTH STEAM GENERATOR FEED PUMPS ARE NOT RUNNING.
THE BREAK IS ON 100 1 ELEV DOWN STREAM OF THE STEAM GENERATOR FEED PUMP DISCHARGE VALVE AND BEFORE THE INLET CONTROL VALVES (BF-7) TO THE HIGH PRESSURE HEATERS *
* 7.04.1
 
SUPPLEMENTAL SCENARIO # 7.04 (CONTINUED)
C. POSTULATED EVENT:
: 3) RESTORATION GUIDELINES:
THE PURPOSE OF THIS SUPPLEMENTAL SCENARIO IS FOR DAMAGE ASSESSMENT ONLY. FOR SCENARIO CONTROL, THERE WILL BE ONE INJURED PERSON, SEE SUPPLEMENTAL SCENARIO # 7.05. THE OSC MAY ATTEMPT TO REPAIR THE FAILURE BUT THEY ARE NOT EXPECTED TO BE COMPLETED PRIOR TO THE TERMINATION OF THIS EXERCISE.
: 4) SCENARIO CONTROLS:
REPAIR TEAMS MAY BE FORMED, HOWEVER REPAIRS OF THE FAILURE ARE NOT EXPECTED.. IF THE OSC IS ATTEMPTING TO REPAIR THE BREAK THIS SUPPLEMENTAL SCENARIO MAY GO PAST 11:20.
D. RADIOLOGICAL CONCERNS:
NONE.
E. ATTACHMENTS:
: 1. TURBINE BUILDING FLOOR PLAN ELEVATION 100 1 *
: 2. FEED WATER PIPING SIMPLIFIED DRAWING.
F. CONTROLLERS SPECIAL NOTES / REFERENCES / OBJECTIVES:
: 1. IF THE OSC ATTEMPTS TO REPAIR THE BREAK, ALLOW THE TEAMS TO GO BEYOND 11:20. REPAIRING THE BREAK HAS NO IMPACT ON EXERCISE.
7.04.2
 
..----------------~------*--*-------*-***-*-**----**-*----*-------
UNIT 2 TURBINE BUILDING EL. 100'-0" Ml0-111-221 flRE ZONE CODE: 2-2-2 OUTDOORS FEEOWATER HTR.&MOISTURE SEP.
rr=----.) u (
REHEAT DRAIN TANKS I ~:;tHTR. ORN. PMPS.122 120  )  0
                                                                      \
(-~
0
                                                                                                    ~
[!]
tlClt    R.ADIAII*~
COllllA.. NAll.D Alf[A u...,..u,,,_
AllCA Alo\RJ.I Sf&lll*1:i.
                                                                                                    ~)  PllflllC A.Dt1ACs*, 11.&Hm.L I fi)  TlllPHLH:
CJ)  lht:RWAL DL Ill I...._
TURB.AUIC.COOLING HEAT EXCHANGERS                                                                  <ID  5MU\( DLTIC.ICJH J
(    121 c
::0 aJ
                                                                                                  ,_!.I I O*f W.t.nff OCLUG(
SP~..UR zrTI                  l,!J DllUCC      sn n w aJ c
                                                                                                    @l    AUIU-f'R[AChl>>I '.)f'thHto.llM
                                                                            ;=                    (!)  AUlt.i!ATIC Ii( I t'll"C SPR1t<<llN Cl z
                                                                              '1                    ~    Cl~-,,.,,IQMAILL        flX(lJ ~lSIIW II)  C&deg;J *UAMJM. rl*[D !.'ISIUI
                                                                                                    ~    ttAH... ISOI AJllW.,11C flXI II :i,r.,llW SGFPT.                ~    t1Al0H UOI MANU"l fl*UJ St11(U OIL PIAPS.(2)      tOt    DfiUCl VAl\(
VAPOR EXlRACT TURN GR.,            &#xa3;    PoRJMll MllA [ll1Uc;.l11:i.11(H RESERVOIR HTRS        A    PORU8.L HAI.ON (XltHClilStllR EMERG. Oil PMP.      &#xa3;    PORfAll.I CO.iUTl'llWSHCR
                                                                                                    &#xa3;  POfUAl!I.[ OJU l>1CW unuc.u1!.ltlH
                                                                                                    ~  1105( STATK:lH CHAlll.U>          Sl~DPIPI 181 ltAf01 FLOOR Ll\ltl
                                                                                                    ~  ld1 IOt CCUNi; U '4l
                                                                                                        . . CAlt CQz HOSI.      ld.ll.
fS -  SlCUfllfY wu:m DOOA lH
* HIAl...TH Pnnrc.s
 
_...._......._.To Condenser 22 Chem Feed FW
                            -l-                                                            Control
                                                                                          *Valve Aux  ;J :~~
JI_~
2iiA 1i26BD IJ  ,* *-2e-c HP Feed Healers                Bypass Feed (Warmup) .,...__
                                                          -e:, re. &deg;' K Cond 21 4
                                                    ?
                                ~[)llO-ii_:::. . ~
(Warmup)                                          (Reclrc)        1i-1~.-.......--'*1"9tm-*il"~1-6'1~- S/O Cond 21        ~                                Condenser                                              *22 Condensate                                          21
                      .__.~,...fllfi"I--....
                                                .._~
Sys I e rn From Healer Drain Pumps I 11 I }/ .. II .. .'
* TITLE START TIME    10:35 SUPPLEMENTAL SCENARIO # 7.05 INJURED MAN END TIME    11:35 LOCATION      UNIT 2 TURBINE BULIDING WEST OF THE MAIN CONDENSERS. ELEV. 100' A. INITIATING CONDITIONS:
MAIN STEAM LINE FAILED CAUSING STEAM TO ENGULF THE TURBINE BUILDING.
A SECURITY GUARD WAS BURNED WHILE RETURNING TO THE GUARD-HOUSE.
B. RELATED MESSAGE FORMS:  19
* C. POSTULATED EVENT:
: 1) FAILURE MODE (OR CAUSE):
A SECURITY GUARD WAS BURNED WHILE EXITING THE POWER BLOCK THROUGH UNIT 2 TURBINE BUILDING.
THE VICTIM IS LAYING ON THE GRATING WEST OF THE MAIN CON-DENSERS.
: 2) SYMPTOMS (OR INDICATIONS):
SEE T. McILLVAINE *
* 7.05.1
 
SUPPLEMENTAL SCENARIO# 7.05
{CONTINUED)
C. POSTULATED EVENT:
: 3) RESTORATION GUIDELINES:
SEE T. McILLVAINE.
: 4) SCENARIO CONTROLS:
THE GUARD WILL BE THE ONLY VICTIM.
FOR SCENARIO CONTROL, SHORTLY AFTER THE STEAM LINE BREAK FIRE PROTECTION WILL BE ALLOWED TO ENTER THE TURBINE BUILD-ING.
FIRE PROTECTION WILL ONLY TRANSPORT THE VICTIM TO THE GUARD HOUSE. THEY WILL NOT ENTER THE SALLY PORT.
CALLS FOR OFFSITE ASSISTANCE IS TO BE SIMULATED.
D. RADIOLOGICAL CONCERNS:
NONE.
E. ATTACHMENTS:
: 1. TURBINE BUILDING FLOOR PLAN ELEVATION 100 1 *
: 2. ATTACHMENT FOR VICTIMS VITAL SIGNS.
F. CONTROLLERS SPECIAL NOTES / REFERENCES / OBJECTIVES:
: 1. CALLS FOR OFFSITE ASSISTANCE IS TO BE SIMULATED.
: 2. DO NOT TRANSPORT THE VICTIM THRU THE SALLY PORT.
7.05.2
 
NO. 2 UNIT                  NO. I UNIT UNIT 2                                                                                                            LOG TURBll~E BUILDlf IG EL. 100'-0"                                                                        ~-N--
MIO -111-221 flflE ZONE CODE: 2-2-2 OUTDOORS wrn *n*rtD lc.JPllEN1 OJ.I 0
CCllllA.. NAllD lltlA lllNfUN. Al.ARN SfAWCIHS llLllJC AODlttSS HMDSl1 nt0tt1.trt. or:n:ctllft:
IWl>ll 0C1[CIDlll WA'llR DO.UC(
DILUGt SIS 101 AU1011A11C 11[1 Pft . . HlUlt
                                                                                                                            ~ -111.nou..nc      nri.o STStt~
Q\-llAMJAL FllCD SYSIDI HAI.ON UGI AU1Dtil&T1C flJl.D 51'StlW HALON UGI MANUAL f1XCO SlSlUI f<:>t          DO.II<< .....
                                                                                                                  &#xa3;_        P'OllllAOU MT[lt Cl_..GUWtlft A ,...,.... -o* IXflNCUSHC*
                                                                                                                  ...      P<llJA!l.( COJU"'WSH<ll
                                                                                                                  &#xa3;.      'IJllTAll.I: DH DOI. P:rN:OulSH[RI f6l"'      ttOSI SIAT10N CHAlltm 5flM>PIP(.
WITiiDRAWAL AREA EL. 100"-2" 13]      HAfOt COJNC        mo.
HAZ-*MAT LOCKER                      SER\llCE BUILDING LC.~
                                                                                                                    ...,.,                    rs
* SfCUIUY lDOl.m DOOSI tH - HUI.TH PHYSICS CHLORINE
[QJ onuc< ACtuAnOH HA'ftai PUMPS OUTDOORS
 
Attachmen't: to Supplemen"t:al # 7.05
* SYMPTOMS VITAL SIGNS The victims face appears to be extremely red and his shirt extremely brittle. When he speaks his voice is weak and hoarse. His hair is singed around his face to include his nose and mustache. Some difficulty breathing, when checked the vital signs will be Blood Pressure 100/68, pulse 122, respirations weak at 10, temperature 100.2 degrees F, the skin is hot and dry.
EXPECTED Respond with the equipment needed as per the RESPONSE nature of the call. Upon arrival place the.
patient in an uprig)U: position; assess vital signs; insert an oralpharyngeal or nasopharyn-geal airway if the patien't: can tolera"t:e it; remove patient from area of the heat condition remove any clothing that might restrict the patient chest movement; administer high flow 100% humidified oxygen; continue to monitor vital signs; call for additional advanced life support and even a helicopter to air-evacuation
* the patient to a burn center
* NOTE: Calls for offsite assistance is to be simulated .
* 7.05.4
* TITLE START TIME SUPPLEMENTAL SCENARIO # 7.06 .
REACTOR TRIP BREAKERS/ROD DRIVE MG SETS END TIME LOCATION      REACTOR TRIP BREAKERS AND ROD DRIVE MG SETS. AUXILIARY BUILDING ELEV .. 84 1 A. INITIATING CONDITIONS:
AT 10:30 AN AUTOMATIC REACTOR TRIP HAS FAILED TO BRING THE REACTOR SUBCRITICAL.
B. RELATED MESSAGE FORMS:  20D
* C. POSTULATED EVENT:
: 1) PAI.LURE MODE (OR CAUSE) :
THE AUTOMATIC AND MANUAL REACTOR TRIP INITIATED BY THE LOSS OF MAIN FEED FAILS TO BRING THE REACTOR SUBCRITICAL.
: 2) SYMPTOMS (OR INDICATIONS):
DURING THE PERFORMANCE OF EOP-TRIP-1 IT WAS OBSERVED THAT BOTH THE AUTOMATIC AND MANUAL TRIP HAD FAILED. IN ORDER TO TRIP THE REACTOR THE OSC TEAM IS *.DISPATCHED TO THE SWITCH GEAR ROOM IN THE AUXILIARY BUILDING TO MANUALLY OPEN THE REACTOR TRIP BREAKERS AND TRIP THE ROD DRIVE MG SETS. WHILE IN THE EOP, BREAKER 2E6D AND ROD DRIVE MG SET BREAKERS ARE CLOSED *
* 7.06.1
 
SUPPLEMENTAL SCENARIO # 7.06
{CONTINUED)
C. POSTULATED EVENT:
: 3) RESTORATION GUIDELINES:
OSC TEAM DISPATCHED TO THE SWITCH GEAR ROOM TO OPEN THE REACTOR TRIP BREAKERS AND TRIP THE ROD DRIVE MG SETS, THIS ACTIVITY WILL BE SUCCESSFUL.
THE OTHER TEAM DISPATCHED TO THE 2E 4KV GROUP BUS AND WILL OPEN BREAKER 2E6D (2E 460V BUS TRANSFORMER).
THIS ACTIVITY IS ALSO SUCCESSFUL.
NOTE: THE SAME TEAM MY OPEN BOTH BREAKERS.
: 4) SCENARIO CONTROLS:
THIS ACTIVITY IS TIME DEPENDENT ON THE OPERATIONS CREW AND WHERE THEY ARE IN THE EMERGENCY OPERATING PROCEDURE (EOP) ,
THEREFORE TIME WILL BE APPROXIMATE.
D. RADIOLOGICAL CONCERNS:
NONE.
E. ATTACHMENTS:
: 1. SWITCH GEAR ROOM ELEVATION 84 1 , AUXILIARY BUILDING.
F. CONTROLLERS SPECIAL NOTES / REFERENCES / OBJECTIVES:
: 1. REFEREE TO INFORM SIMULATOR INSTRUCTOR AT EXT. 4-459-3775 WHEN REACTOR TRIP BREAKERS HAVE BEEN SIMULATED TO BE OPEN.
7.06.2
 
UNIT II 84 ELEV SWITCH GEAR
* UPS PQ!IAARY & SECONDARY I ,
:.;INVER
                                    ~
                                            ~TERS?"
ON rm* ,.
I    I uP:i/'::.:
I  ~I
                                                                                          ~!I
                                                                                          ~ii
                                                                                                ,~LIS 0
SERVICE 9 AIR PACKS I :                c l z DOC PANEL 1
                                                                              ~
                                                                                                  ~~
I "ACTOR TRIP f24 SWGR!
EXH. F A N -
h ROD T
CONTRO~
(      IG
                                                ~
                                                ~
                                                ~2 soc PANEL~
ii\
                                                                    @ \t) (f\
CABLE SHAFT SEE I                                JOV                    #ZA-460V I 2A- 2                          \II TAL BUS Il___;!                \1TAL BUS Ir TRANSF'.
                                                                                    .le TRANSF.
In 11 1Z5 SWGR.I
::XH. f A N -
* I        ~*~              =:====:=ii::::====~~:. ~
                                                          . *"'                                CABLE SHAFT i'
          ,.,z
:a>
                    ~ _*_      ...__ ~                              @ (J)                              cCS  t 6
f2E-460V BUS N.V.
128-2.JOV VITAL BUS f28-460V VITAL BUS n
fi'lt ~  .,.,
                                                                                  &_r_R_AN_s_,_.---~1 z
ok TRANSF.              " TRANSF.                __
:II j
rcASi:&#xa3;I
  #26 SWGA.
EXH. F A N -
                                                                                              ~
f2G-460V                  12C-2JOV                    f2C-460V BUS N.V.                VITAL BUS                    VITAL BUS
                            & TRANSF.                ok TRANSf.                  k TRANSf.
COE  PANEV'0~&deg;'2 ADE PANEL                                              I CABLE  1'.
I SHAFT
:1 I 2SV BA TT. CHCRS.            2SCJV DC BUS fT\
2C 12"1 I: BArT. CH!Jl.
c::::r:::I Cl.              ~  l:ZSY          D  \t.J LCS
                                                          ~                          125V BATT. CHCRS.
SP!NT FUEL COUP. a.G. HX. ~PUMP AREA 7.06.3
 
Motor Generators    Generator Motor Breakers Breakers 460 VAC l - - 1 i - " - . - _ , .
30 60Hz  a--.*-" _.._....._ ._____..
          ==
                -,                                Reactor Trip Breakers ITA-.c-1    1.~~      DC Hold RTA        RTB DC 1-*lold        (        (-
11-tWr\        r-'\!...t--.
P.ower        _  _{___ {_
2 BD    1 BD          SCD
(
BYA        "-----
BYB 260 V AC. 58.5 Hz Power Cabinets
* TITLE START TIME  10:33 SUPPLEMENTAL SCENARIO # 7.07A 23 AUX. FEED PUMP END TIME    11:20 LOCATION    UNIT 2 84 1 ELEV. AUX. BLDG.
A. INITIATING CONDITIONS:
23 AUXILIARY FEED PUMP TRIPS DUE TO A DAMAGED MECHANICAL TRIP LATCH MECHANISM.
B. RELATED MESSAGE FORMS:  18D, 21C & 25D
* C. POSTULATED EVENT:
: 1) FAILURE MODE {OR CAUSE):
THE TRIP LATCH MECHANISM IS DAMAGED WHICH ALLOWS THE MS-52 TO TRIP CLOSED WHEN THE PUMP RECEIVES AN AUTO START SIGNAL.
: 2) SYMPTOMS {OR INDICATIONS):
23 AUX FEED PUMP ROOM IS WARM AND HUMID.
THE PUMP IS NOT RUNNING.
WHEN CHECKED, THE TURBINE TRIP VALVE (MS-52) IS CLOSED AND THE MECHANICAL TRIP MECHANISM IS UNLATCHED *
* 7.07A.1
 
SUPPLEMENTAL SCENARIO# 7.07A (CONTINUED)
C .. POSTULATED EVENT:
: 3) RESTORATION GUIDELINES:
THE OSC TEAM W:LL RESET THE TRIP MECHANISM.
WHEN RESET THE TURBINE WILL AUTO START.
: 4) SCENARIO CONTROLS:
THE TURBINE MUST BE RESET AT 11:20.
UPON CLOSE INSPECTION, THE TRIP MECHANISM IS DAMAGED BUT FOR SCENARIO CONTROL, IT WILL NOT PREVENT A RESET OF THE TURBINE.
D. RADIOLOGICAL CONCERNS:
NONE.
E. ATTACHMENTS:
: 1. AUXIL.IARY BUILDING FLOOR PLAN ELEVATION 84 1 *
: 2. 23 AUXILIARY FEED PUMP TRUBINE SIMPLIFIED DRAWING.
TRIP MECHANISM - RESET.
TRIP MECHANISM - TRIPPED.
F. CONTROLLERS SPECIAL NOTES / REFERENCES / OBJECTIVES:
: 1. RESETTING THE TURBINE WILL BE SUCCESSFUL.
: 2. THE PUMP MUST BE IN SERVICE AT 11:20.
: 3. THIS SUPPLEMENTAL WILL BE FOLLOWED BY SUPPLEMENTAL # 7.07 7.07A.2
 
CNIT TWC
                                          '2R36                                      AUX BUILDINC 84: EJ
                        .~2  SJ I i : 1 n~~~~~~~*-
u      21 CC HX      _ ~
PCPCS --*-2Rl 7A    ~ ,2R17B I qADIOLGG:CAL iiiFORMATION
::: ..;TE  -:~  JP.ILL:    . _;~JE ::. 1993
                                                            -JRILL      ~:~.1E(S)  :  ~-JOO  -  -:::,lD REAL TIME(S) : *J800 -              '.:ND
*    ~R25 AIR SAMPLE DATA : SEE GENERAL AREA AMS READING: -+00 CCPM AUX BUILDING AIR DJ CONTINUOUS AIR MONITOR (AMS)
CONTAMINATION LEVELS: N/A u          DOSE ?ATES iil MR/HR UNLESS OTHERWISE INDICATED.
21 rncp I CTMT 2R4                                              SPRAY PUMPS SPRAY ADDIT.
TANK REFUEL SPENT RESIN TANK
            ./
STORAGE/
WASTE jl MONITOR TNKS & PMPS PRIMARY WATER MAKE-UP PUMPS WATER PURIF .
PUMP 7.07A.3
 
MS-46              tvtS~45          Main IM a1n 1
I I  . I' Sfea~
J><1.-1
                                        - - - -  Steam (1123 S/G)*
(#21 S/G)
Start-Stop MS-132 Valve Governor Trip Valve  MS-52              Valve MS-53
[
Aux
                                              *Feed P11mp _
J Turl:line
 
TRIP MECHANISM - RESET
  '"4ANQ 11
:..EVE~
                                    ~**
S' P"'ID TRIP 1-+COJ:
* 7.07A.5
 
TRIP MECHANISM - TRIPPED
                                              .i I ~****
                    ~        cnen1a TRIP HOCIS::
7.07A.6
 
TRIP MECHANISM - RESET
* 11
:..EVE~
* 7.07.S
 
TRIP MECHANISM - TRIPPED 7.07.6
* TITLE START TIME    12:00 SUPPLEMENTAL SCENARIO # 7.07 23 AUX. FEED PUMP END TIME  13:15 LOCATION      UNIT 2 84 1 ELEV. AUX BLDG A. INITIATING CONDITIONS:
AT 12:00, 23 AUX FEED PUMP TRIPS DUE TO FAILURE OF THE MECHANICAL TRIP LATCH MECHANISM.
B. RELATED MESSAGE FORMS:    29D, 30, 31C, 32, 34, & 35D
* C. POSTULATED EVENT:
: 1) FAILURE MODE (OR CAUSE):
THE MECHANICAL TRIP MECHANISM FAILED, ALLOWING THE TURBINE TRIP VALVE (MS-52) TO CLOSE.
: 2) SYMPTOMS (OR INDICATIONS):
23 AUX FEED PP ROOM IS WARM AND HUMID. 23 AUX FEED PUMP HAS STOPPED RUNNING. WHEN CHECKED THE OSC TEAM WILL OBSERVE THE MECHANICAL TRIP MECHANISM UNLATCHED AND AND THE END OF THE MECHANISM BROKE OFF.
THE TURBINE TRIP VALVE (MS-52) IS CLOSED *
* 7.07.1
 
SUPPLEMENTAL SCENARIO # 7.07 (CONTINUED)
C. POSTULATED EVENT:
: 3) RESTORATION GUIDELINES:
TO RESTORE THE AUX FEED PUMP, THE OSC TEAM WILL HAVE TO RE-PLACE OR REPAIR THE TRIP MECHANISM. THE TEAM SHOULD LOCATE REPLACEMENT PART IN THE STOREROOM OR REPAIR THE BROKEN PART.
WHEN THE TRIP MECHANISM IS RESET THE TURBINE WILL AUTO START.
: 4) SCENARIO CONTROLS:
THE 23 AUX FEED PUMP CAN NOT BE RESTORED UNTIL 13:15.
IF REPLACEMENT PARTS ARE REQUIRED THE TEAM SHOULD DEMONSTRATE THE ABILITY TO LOCATE THE PARTS IN THE STORE ROOM BUT SHALL NOT REMOVE ANY PARTS.
D. RADIOLOGICAL CONCERNS:
NONE.
E. ATTACHMENTS:
: 1. AUXILIARY BUILDING FLOOR PLAN ELEVATION 84'.
: 2. 23 AUXILIARY FEED PUMP TURBINE SIMPLIFIED DRAWING.
TRIP MECHANISM - RESET.
TRIP MECHANISM - TRIPPED.
F. CONTROLLERS SPECIAL NOTES / REFERENCES / OBJECTIVES:
: 1. THIS SUPPLEMENTAL SCENARIO WILL BE SUCCESSFUL.
: 2. THE 23 AUX FEED PP MUST BE RETURNED TO SERVICE AT 13:15.
: 3. IF THE OSC TEAM REPLACES THE FAILED TRIP MECHANISM THEY SHOULD DEMONSTRATE THE ABILITY TO OBTAIN A REPLACEMENT PART FROM THE STOREROOM.
: 4. THIS SUPPLEMENTAL IS A FOLLOW UP TO # 7.07A.
7.07.2
 
:::=::NT      r  I  *r-  I    ...
l:NIT TWO
:~:::,IT
              , __                              . ::; I r
2R36                                        AUX BUILDING
                                                                        ._., I 84: EL 111                              ~
                                                                                    ~
                                              ! 1 !
C": i      I::::'. c:  __, II
                                              '<Ji cc
                          ~    .        21    C~HX                      ~
PPS    *2R17 A ~--2Rl 7B gJj              ~ADIOLGC:CAL      1i lFORMATION
  -'- 'J
                          ~              22    cc          HX          ~.
JATE  *:i=" DRILL    _.JNE 23. 1993
  ,[.. J'j..                            o  I JR!LL    :;~.~E(S) :  :ooo -
rD pP*                                              u~                  ~
                                                                                                                                .::ND REAL TIME(S) : J800 -            ::NO
                                                                                    ~
AIR SAMPLE DATA : SEE GENERAL AREA AUX BUILDING AIR DATA AMS READING: 400 CCPM 2R25 2R24B                                                                                          CONTINUOUS AIR MONITOR (AMS)
CONTAMINATION LEVELS:          N/ A D        DOSE ?.ATES IN MR/HR UNLESS OTHERWISE INDICATED.
                    ~
                                                                        ~
2lOJ!:~ I CTMT 2R4              2fC~ I                                                          SPRAY PUMPS I 2:3I 't"'"!=! I                                                SPRAY
                    ~
2R18 ADDIT.
TANK
                                                                        ~
REFUEL WATER
*                                                                          &deg;' ~          PURIF.
SPENT                                                                                PUMP RESIN/                        WASTE &#xa5;1                      PRIMARY WATER STORAGE                                                                                      4    N91lmii MONITOR                          MAKE-UP PUMPS TANK                  TNKS & PMPS 7.07.3
 
MS-46                              Main Main 1  '
1
                                  ...---1111  Steam Stearn                                        ( #23 S/G)*
(~21.S/G)
Start-Stop  MS-132 Valve Governor Trip Valve  MS-52            Valve
                                          ~x To Atmosphere MS-53
[
* Feed Pump _
J TurQine
      **                                                  --- - - - - - ____ _ _ J
* TITLE
  .START TIME    11:30 SUPPLEMENTAL SCENARIO # 7.08 .
22 AUXILIARY FEED PUMP PROBLEM END TIME  14:00 LOCATION      22 AUX. FEED PUMP AUX. BLDG. ELEV. 84  1 2B VITAL BUS, AUX. BLDG. ELEV. 64 1 A. INITIATING CONDITIONS:
THE CONTROL ROOM WILL RECEIVE INDICATIONS THAT 22 AUXILIARY FEED PUMP HAS TRIPPED AT 11:30 HOURS. ANY ATTEMPTS TO RE-START FROM THE CONTROL ROOM WILL BE UNSUCCESSFUL.
B. RELATED MESSAGE FORMS:  26D, 27C, 28, 30D, & 36
* C. POSTULATED EVENT:
: 1) FAILURE MODE (OR CAUSE):
AN OVERLOAD RELAY WILL ACTUATE, AND TRIP 22 AUXILIARY FEED PUMP DUE TO A SHORT WITHIN THE MOTOR CONNECTION BOX.
: 2) SYMPTOMS (OR INDICATIONS):
WHEN THE BREAKER CUBICLE IS CHECKED, THE OVERLOAD RELAY WILL BE FOUND IN THE TRIPPED CONDITION.
THERE IS AN ODOR OF BURNT INSULATION IN THE AIR, IN THE VICINITY OF THE LEADS CONNECTION BOX AT THE PUMP MOTOR.
WHEN THE MOTOR IS CHECKED AN OSC TEAM MEMBER WILL NOTICE THE LEADS CONNECTION BOX HAS A HOLE AND HE CAN SEE ONE OF THE MOTOR LEADS.
NO OTHER PROBLEMS WILL BE FOUND *
* 7.08.1
 
SUPPLEMENTAL SCENARIO# 7.08
{CONTINUED)
C. POSTULATED EVENT:
: 3) RESTORATION GUIDELINES:
TO RESTORE THE AUXILIARY FEED PUMP TO AN OPERABLE STATUS, THE CONNECTION BOX HAS TO BE OPENED AND ALL THE MOTOR LEADS DISCONNECTED, MOTOR MEGGERED, AND LEADS RECONNECTED AND RE-TAPED.
: 4) SCENARIO CONTROLS:
THE CABLE LUGS WERE NOT DAMAGED. ONE OF THE MOTOR LEADS IS BURNT OFF (Nb SLACK LEFT IN THE MOTOR LEAD TO ALLOW IT TO BE RECONNECTED.) THE MOTOR MEGGERED GOOQ ON BOTH ONE (1)
MINUTE READING AND TEN (10) MINUTE PI. SINCE THE MOTOR LEAD IS TOO SHORT TO BE RECONNECTED THE AUXILIARY FEED PUMP MOTOR WILL HAVE TO BE TAKEN APART. THIS ACTIVITY WILL TAKE SOME TIME AND THE PUMP SHQULD BE RETURNED TO SERVICE AFTER THE TIME ACCELERATION OF THIRTY (30) HOURS AT 20:15 HOURS.
D. RADIOLOGICAL CONCERNS:
NONE.
E. ATTACHMENTS:
: 1. 2B 4KV VITAL BUS SHOWING THE LOCATION OF THE AUXILIARY FEED PUMP BREAKER.
: 2. AUXILIARY BUILDING FLOOR PLAN ELEVATION 84 1
* F. CONTROLLERS SPECIAL NOTES / REFERENCES / OBJECTIVES:
: 1. THIS FAILURE OCCURS AT 11:30 AND WITH THE TIME JUMP IN THE SCENARIO THE OSC TEAM WILL HAVE APPROXIMATELY NINE (9) HOURS TO REPAIR THE MOTOR LEADS AND RETURN THE PUMP TO AN OPERABLE STATUS.
7.08.2
* UNIT II 64' ELEV SWITCH GEAR J~iDERGROUND    WALL oi
              ,..,,        __      ~;
                                            /
I AIR PAt:KS
                                                  ' 0 0 I.
7 C9 ---
_ , ,:-_.c.s. ~
srA1R1s let
                                                                                    /,
cl&sect;~I i ' -SET~;
:::ll    11      ---
I :.#221    i .;211 ON , t+~++n9i!
M/G n
1
              .~. .          1*0ti'            -~ -        ~ -    T                              LJ 10.
r I                                    11-1 i              I  SEE s::cTION 6.7.1..../        ~            t:AB. (2)      <.    ~
                                              ..__________________                      -,.,r~~
::XHAUST FAN~          ,___ -
:' "'L-I 1~~1 I
1 I
LI            u                                                          -0Ci
::XHAUST  FAN-l
                        -!J/G SE@T            L______--'r?B=                                            >
::c
                                              -      N2B-~160V VITAL BUS        *                      >
2                                                                  ,..,::c
                                              ~                                      ij                  ~
2C460V VITAL                                                                  -
aJ r;t 60''*'
BUS=SIONJ                                2ASDS INVERTER -                    ::u EXHAUST F'AN LYI                  f2C-4160    ~TAL BUS                  ':ii:
:a 0
0 3::
      '\
(Z ASDS 115V AC DIST. PANEL-*
        \\
12FL-208/            fl-------
120V LTC BUS - - - - - - - - - - - '
c:
H.P. STORAGE & MONITOR TANK AREA c&#xa3;fii*~
* 7.08.3
 
:-~-)TIT    ~WO
                                          *                                                    . u*'--
                                          ~P.36 3UIL~I~.Tr:
                                                                                                  ,    i  \
84'  ~
                                            . *~
I r:;::-7.
                                                        ---I I
n1---------*
* I LI        ~1 cc  HX 1
j cc *-*-~Rl7ArD.2R17B I PPS n          22 cc ~-t<          :1 LI~--------~.                                        ::: . \TE *::::::- :~:LL      -*~~E      ::::.::. 1993
.- L)
I
                                                                      ~EAL      TiME(S) : *JSOO -                  ::NO
:.:::R31 e    I~
AIR SAMPLE DATA : s:::E GENERAL AREA AUX BUILDING AIR *'"'"TA
                                                                    ..l.MS READING: ..:.oo CCPM 2R25 CONTINUOUS AiR MONITOR (AMS)
CONTAMINATION LEVELS: N/A u          DOSE ;::ATES iil MR/HR UNLESS OTHERWISE INDICATED.
Kn OJ                    Kjj I 2l ~:~ I
            ~          ~
CTMT 2R4          ' 1 I 22 ~:~ I                                      SPRAY PUMPS I 2:3"t.. !' I
            ~
2R18 SPRAY ADDIT.
TANK
                                            ~
REFUEL WATER
                                                  ~~
PURIF.
SPENT RESIN/
STORAGE TANK WASTE &#xa5;1 MONITOR TNKS & PMPS PRIMARY WATER MAKE-UP PUMPS PUMP 4        N9itm1!i 7.08.4
 
SECTION  a.o ARTIFICIAL ISLAND ANNUAL EXERCISE 1993 OPERATIONAL DATA The operational data contained in                                                            Section 8.0 was developed using values obtained from a test                                                            run on the Salem Simulator.
Actual values of plant parameters                                                            seen during the Annual Exercise will vary dependent upon                                                            actions taken by the Operators in the Simulator as the                                                            scenario events occur.
Pump start/stop times, flow rates, Reactor Pressure, specific equipment placed in and out of service and so on will deviate depending on several variables which include both operator judgements and simulator model dynamics.
The data in this section has been used to predict plant status throughout the scenario as a basis for developing consistent radiological data.
The radiological data Sections 9.0 and 10.0 reflect closely the plant status shown in Section s.o, but are not the direct product of the Simulator. Ratherv another computer model.
* described in Section 5.5 has been used to generate the data displays and the tables needed by the referees based on operational parameters in this section.
This operational data serves several purposes during the control of the exercise.
: 1.          Referees in the TSC and EOF may provide interpolated data to a player after the player has demonstrated the ability to obtain the information from actual plant computer systems, displays, etc. normally available in those facilities.
: 2.          Simulator referees will continually track the performance of the Simulator against the predicted data as a check on simulation reliability and possible deviation from the scenario that may require referee intervention.
: 3.          If the Simulator must be FROZEN for any reason that is unrecoverable, the data in this section will be used to replace the otherwise live parameters so that the exercise may continue with minimal interruption *
* a.o.o
              .  ....  ***-********* ... -.* * ..... * .. " --- :or ~:** ";""'~ *:*. . . i** ..... , **. . --          ... ,*,.,_.... -:- ...*. .                  -----*-***
 
SALEM GRADED EXERCISE (S93*03)  JUNE 23, 1993 CN CHRG SI PUMP REAL DRILL FLOW FLOW #1 TIME TIME (GPM) (GPM)
SI PUMP RHR PUMP RHR PUMP RWST CONT CONT CONT SUMP CONT RAD CONT RAD RCPs RVLIS HOT'ST TCs >
FLOW #2 FLOW #1 (GPM)    (GPM)
FLOW #2 LEVEL PRESS TEMP CH2J LEVEL R44A (GPM) (FT) (PSIG) (DEG) <X> (X) (R/hr) (R/hr)
R44B  RUN (FULL)
(#)  c:o TC (Deg) 1200F #1
(#)  (Deg)
COLD LEGS TEMP
                                                                                                                                                #2 (Deg)
                                                                                                                                                      #3 (Deg)
                                                                                                                                                              #4 (Deg)
TAVE AUCT.
(Deg)
I
  ====== ============= =======  ======= ========= ========= ===== ====== ===== ===== ===== ======== ======== === =======.======= ===== ===== ===== ===== ===== =======
IND 08:00  00:00    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538 538 538 538            571 08:10  00:10    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538 538 538 538            571 08:15  00:15    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538 538 538 538            571 08:20  00:20    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538 538 538 538            571 08:25  00:25    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538 538 538 538            571 08:30  00:30    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538 538 538 538            571 08:35  00:35    0      0      0      *O          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    538  538    538    571 08:40  00:40    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    538  538    538    571 08:45  00:45    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    538  538    538    571 08:50  00:50    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    538  538    538    571 08:55  00:55    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    538  538    538    571 09:00  01:00    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    538  538    538    571 09:05  01:05    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    538  538    538    571 09:10  01 :10    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    538  538    538    571 09:15  01:15    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    538  538    538    571 09:20  01:20    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    538  538    538    571 09:25  01:25    0      0      0        0          0    41.2    0      97 . 0    42        1        1  4    >120    620    0  538    538  538    538    571 09:30  01:30    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    538  538    538    571 09:35  01:35    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    538  538    538    571 09:40  01:40    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    538  538    538    571 09:45  01:45    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    538  538    538    571 09:50  01:50    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    .o  538    538  S38    s3a*  S71 09:55  01:55    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    S38  S38    S38    S71 10:00  02:00    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    S38  S38    S38    S71 10:05  02:05    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  538    S38  S38    S38    S71 10: 10  02:10    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  S38    S38  S38    S38    S71 10:15  02:15    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  S38    S38  S38    S38    S71 10:20  02:20    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  S38    S38  S38    S38    S71 10:25  02:25    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  S38    S38  S38    S38    571 10:30  02:30    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    620    0  S48    S48  S48    S48    SBO 10:32  02:32    0      0      0        0          0    41.2    0      97    0    42        1        1  4    >120    STt    0  S49    S49  sso    S50    S82 10:34  02:34    462      0      79        0          0    41.1    0      97    0    42        1        1  4    >120    577    0  S44    S44  S43    544    SS6 10:36  02:36    500      0      251      0          0    41.1    0      97    0    42        1        1  4    >120    S77    0  S44    S44  543    S44    SS6 10:38  02:38    497      0      251      0          0    41.0    0      97    0    42        1        1  4    >120    S77    0  S44    S44  S43    S44    SS6 10:40  02:40    489      0      249      0          0    41.0    0      97    0    42        1        1  0    114    S77    0  SS4    SS4  SSS    S44    5S6 10:42  02:42    442      0      0        0          0    40.9    0      97    0    42        1        1  0    111    S77    0  SS4    S54  55S    S44    SS6 10:44  02:44    398      0      0        0          0    40.9    0      97    0    42        1        1  0    10S    577    0  sso    S50  551    SS1    S52 10:45  02:45    346      0      0        0          0    40.9    0      97    0    42        1        1  0    104    576    0  S43    S43  S44    S44    S4S 10:50  02:50    0      0      0        0          0    40.8    0      97    0    42        1        1  0    103    S76    0  S40    S40  S41    S41    S42 10:55  02:S5    0      0      0        0          0    40.8    0      97    0    42        1        1  0    101    S48    0  S3S    53S  536    S36    537 11 :00 03:00    378      0      0        0          0    40.8    0      97    0    42        1        1  0    101    547    0  530    S30  S31    S31    S32 11:05  03:05    173      0      0        0          0    40.8    0      97    0    42        1        1  0    101    S47    0  S29    S29  S30    S30    S31 11:10  03:10    0      0      0        0          0    40.7    0      97    0    42        1        1  0    101    547    0  S30    S30  531    S31    532 11:15  03:1S    0      0      0        0          0    40.7    0      97    0    42        1        1  0    101    S45    0  S30    S30  S31    S31    S32 11:20  03:20    0      0      0        0          0    40.7    0      97    0    42        1        1  0    101    54S    0  S32    S32  533    533    534
-a QQ
 
SALEM GRADED EXERCISE (S93*03)    JUNE 23, 1993 CN CHRG SI PUMP SI PUMP RHR PUMP RHR PUMP RWST CONT CONT CONT SUMP CONT RAD CONT RAD RCPs RVLIS HOT'ST TCs >
REAL DRILL FLOW FLOW #1 FLOW #2 FLOW #1 TIME TIME (GPM) (GPM) * (GPM)        (GPM)
FLOW #2 LEVEL PRESS TEMP CH2J LEVEL R44A (GPM)  (Fl) (PSIG) (DEG) <X>  (X)
R44B (R/hr) (R/hr)
RUN (FULL)
(#)
TC    1200F #1 COLD LEGS TEMP
                                                                                                                                              #2    #3    #4 oa (Deg) (#) (Deg) (Deg) (Deg) (Deg) (Deg)
TAVE AUCT. I s:s**= *=s========== ======= =~===== ========= ========= ===== ====== ===== ===== ===== ======== ======== --- ------- ------- -----
                                                                                                                -------.------- ----- ===== ===== ===== ===== =======
IND 11:25 03:25      0      0      0        0          0    40.7  0      91    0    42                    0    101    547      0  534 534 535 535          536 11:30 03:30      0      0      0        0          0    40.7  0      97    0    42                    0    101    549      0  536 536 537 537          538 11:35 03:35      0      0      0        0          0    40.7  0      91    0    42                    0    101    550      0  538 538 539 539          540 11:40 03:40      0      0      0        0          0    40.7  0      97    0    42                    0    101    551      0  539 539 540 540          541 11:45 03:45      0      0      0        0          0    40.7  0      91    0    42                    0    101    550      0  538 538 539 539          540 11 :50 03:50    0      0      0        0          0    40.7  0      91    0    42                    0    101    550    *o  538 538 539 539          540 11:55 03:55      0      0      0        0          0    40.7  0      91    0    42                    0    101    550      0  538 538 539 539          540 12:00 04:00      0      o*      0        0          0    40.7  0      97    0    42                    0    101    550      0  538 538 539 539          540 12:05 04:05      0      0      0        0          0    40.7  0      91    0    42                    0    101    550      0  538 538 539 539          540 12:10 04:10      0      0      0        0          0    40.7  0      91    0    42                    0    101    550      0  538 538 539 539          540 12:15 04:15      0      0      0        0          0    40.7  0      97    0    42                    0    101    550      0  538 538 539 539          540 12:20 04:20      0      0      0        0          0    40.7  0      97    0    42                    0    101    550      0  538 538 539 539          540 12:25 04:25      0      0      0        0          0    40.7  0      91    0    42                    0    101    550      0  538 538 539 539          540 12:30 04:30      0      0      0        0          0    40.7  0      97    0    42                    0    101    550      0  538 538 539 539          540 12:35 04:35      0      0      0        0          0    40.7  0      97    0    42                    0    101    550      0  538 538 539 539          540 12:40 04:40      0      0      0        0          0    40.7  0      97    0    42                    0    101    550      0  538 538 539 539          540 12:45 04:45      0      0      0        0          0    40.7  0      97    0    42                    0    101    550      0  538 538 539 539          540 12:50  04:50    0      0      0        0          0    40.7  0      97    0    42                  1  0    101    550      0  538    538  539  539    540 12:55  04:55    0      0      0        0          0    40.7  0      97    0    42                  1  0    101    550      0  538    538  539  539    540 13:00  05:00    0      0      0        0          0    40.7  0      91    0    42                  1  0    101    550      0  538    538  539  539    540 13:10  05:10    0      0      0        0          0    40.7  0      97    0    42                  1  0    101    550      0  538    538  539  539. 540 13:15  05:15    0      0      0        0          0    40.7  0      91    0    42                  1  0    101    550      0  538    538  539  539    540 13:30  05:30    0      0      0        0          0    40.7  0      97    0    42                  1  0    101    550      0  538    538  539  539    540 13:45  05:45    0      0      0        0          0    40.7  0      97    0    42                  1  0    101    550      0  538    538  539  539    540 14:00  20:00    0      0      0        300      3000  41.2  0      90    0    42                  1  0      99    181      0  125    125  125  125    530 14:15  20:15    0      0      0        300      3000  41.2  0      90    0    42                  1  0      99    181      0  125    125  125  125    530 14:30  20:30    0      0      0        300      3000  41.2  0      90    0    42                  1  0      99    181      0  125    125  125  125    530 14:45  20:45    0      0      0        300      3000  41.2  0      90    0    42                  1  0      99    181      0  125    125  125  125    530 15:00  21:00    0      0      0        300      3000  41.2  0      90    0    42                  1  0      99    181      0  125    125  125  125    530 15:15  21:15    0      0      0        300      3000  41.2  0      90    0    42                  1  0      99    181      0  125    125  125  125    530 15:30  21:30    0      0      0        300      3000  41.2  0      90    0    42                  1  0      99    181. 0  125    125  125  125    530 16:00 22:00      0      0      0        300      3000  41.2  0      90    0    42                    0      99    181      0  125    125  125  125    530 16:15 22:15    0      0      0        300      3000  41.2  0      90    0    42                    0      99    181      0  125    125  125  125    530 16:30 22:30    0      0      0        300      3000  41.2  0      90    0    42                    0      99    181      0  125    125  125  125    530
';"'
 
SALEM GRADED EXERCISE (S93-03)  JUNE 23, 1993 TRUE REAL DRILL Tave TIME TIME (Th+Tc)/2 EOP-CFST-1 T sat*
I PZR/RCS PZR PRESS LEVEL #1 HOT LEGS (WR
                                                            #2 (PSIG) <X> (Deg) (Deg) (Deg)
                                                                  #3 RTD 1 s) RX POWER/
                                                                        #4      N FLUX (Deg) (X/A/CPS)
SUB COOL MARGIN (DEG. F)
LTDl.IN CHARG SG LEVELS (NR)
FLOW FLOW #1 #2 #3 #4 (GPM) (GPM) CX) (X) CX> (X)
                                                                                                                                                      # 1 SG PRESSURES
                                                                                                                                                              # 2    #3      #4
                                                                                                                                                                                        #1 S/G FEED FLOll (PSIG) (PSIG) (PSIG) (PSIG) (X)(LBS/HR)
      *z*=== =============== ======  ======= ===== ===== ===== =====  ===== =========                  ========= ===== ===== ==== ==== ==== ====  ======= ======= ======= ======= ===========
ACTUAL  (CET)      IND                                                              ACTUAL 08:00 00:00      575    635      2235    51    601 601 601      601          100                      15  75      87  44  44  44    44      800    800    800    800 08:10 00:10 08:15 00:15 575 575 635 635 2235 2235 51 51 601 601 601 601 601 601 601 601 100 100
                                                                                              ""              15 15 75 75 87 87 44 44 44 44 44 44 44 44 800 800 800 800 800 800 800 800 100 100 100 "
08:20 00:20      575    635      2235    51    601 601 601      601          100                      15  75      87  44  44  44    44      800    800    800    800          100 "
08:25 00:25      575    635      2235    51    601 601 601      601          100                      15  75      87  44  44  44    44      800    800    800    800          100 "
08:30 00:30      575    635      2235    51    601 601 601      601          100                      15  75      87  44  44  44    44      800    800    800    800 08:35  00:35      575    635. 2235    51    601  601  601  601          100
                                                                                          "                    15  75      87  44  44  44    44      800    800    800    800 100 "
08:40  00:40      575 575 635 635 2235 2235 51 51 601 601 601 601 601 601 601 601 100 100
                                                                                                ""              15 15 75 75 87 87 44 44 44 44 44 44 44 44 800 800 800 800 800 800 800 800 100 100 08:45 08:50 00:45 00:50      575 575 635 635 2235 2235 51 51 601 601 601 601 601 601 601 601 100 100
                                                                                          ""                  15 15 75 75 87 87 44 44 44 44 44 44 44 44 800 800 800 800 800 800 800 800 100 100 08:55  00:55                                                                                                                                                                            100 "
09:00  01:00      575    635      2235    51    601  601  601  601          100                      15  75      87  44  44  44    44      800    800    800    800          100 "
09:05  01:05      575    635      2235    51    601  601  601  601          100                      15  75      87  44  44  44    44      800    800    800    800          100 "
575    635      2235    51    601  601  601  601          100                      15  75      87  44  44  44    44      800    800    800    800 09:10  01:10                                                                                                                                                                            100 "
09:15  01:15      575    635      2235    51    601  601  601  601          :100                      15  75      87  44  44  44    44      800    800    800    800          100 "
09:20  01:20      575    635      2235    51    601  601  601  601          100                      15  75      87  44  44  44    44      800    800    800    800          100 "
2235    51    601  601  601  601          100                      15  75      87  44  44  44    44      800    800    800    800 09:25 09:30 01:25 01:30 575 575 635 635      2235    51    601  601 601 601  601 601 100 100
                                                                                                ""            15 15 75 75 87 87 44 44 44 44 44 44 44 44 800 800 800 800 800 800 800 800 100 100 09:35 09:40 01:35 01:40 575 575 635 635 2235 2235 51 51 601 601 601 601 601 601 601 601 601 601 100 100
                                                                                              ""                15 15 75 75 87 87 44 44 44 44 44 44 44 44 800 800 800 800 800 800 800 800 ..
100 100 09:45 09:50 01:45 01:50 575 575 635 635 2235 2235 51 51    601 601 601 601 601 601 601 601 100 100
                                                                                                  ""            15 15 75 75 87 87 44 44 44 44 44 44 44 44 800 800 800 800 800 800 800 800 100 100 09:55 10:00 01:55 02:00 575 575 635 635 2235 2235 2235 51 51 51 601 601 601 601 601 601 601 601 100 100
                                                                                                  ""          15 15 75 75 87 87 44 44 44 44 44 44 44 44 800 800 800 800 800 800 800 800 100 100 10:05 10:10 02:05 02:10 575 575 635 635      2235    51    601  601 601 601 601 601 601 100 100
                                                                                                    ""          15 15 75 75 87 87 44 44 44 44 44 44 44 44 800 800 800 800 800 800 800 800 100 100 100 10:15 10:20 02:15 02:20 575 575 635 635 2235 2235 51 51 601 601 601 601 601 601 601 601 601 100 100 "x              15 15 75 80 87 87 44 44 44 44 44 44 44 44 800 800 800 800 800 800 800 800 100 x 10:25 10:30 02:25 02:30 575 580 635 646 2235 2435 51 61 63 611 618 612 618 612 618 610 618 100 85 "x        26 67 82 68 75 68 44 44 44 44 44 44 44 44 .
880 1080 890 1080 885 1080 883 1080 100 100 10:32 10:34 02:32 02:34 581 555 644 567 2400 1400 . 33    590  590  590 575 590 575 60 10 "x        -10
                                                                                                              -21 0
0 45 45 45 0
46 0
45 0
45 0
1031 911 1031 911 1031 911 1031 911 85 60 10 10:36 10:38 10:40 02:36 02:38 02:40 555 555 556 556 557 581 1288 1292 1548 40 42 45 575 568 560 575 568 560 568 560 568 560 1
1 "xx      -20 4
0 0
45 45 0
0 0
0 0
0 0
0 987 976 987 976 987 976 987 976 20.0E+04 20.0E+04 558  558  558            0                      20    0    45  0  0    0    0      964    964    964    964    20.0E+04 10:42 10:44 10:45 02:42 02:44 02:45 556 552 545 597 602 609 1732 1806 1883 48 52 56 558 554 547 553 546 554 547 553 546 0
0 %
                                                                                                    "x        25 33 0
0 45 45 0
0 0
0 0
0 0
0 955 950 955 950 955 950 955 950 20.0E+04 10.0E+04 10:50  02:50      542    633      2242    71    544  543  544  543        1502  cps                  57  45      77  0  0    0    0      920    920    920    920    10.0E+04 10:55  02:55      537    611      1917    68    539  538  539  538          337 cps                  63  77      75  0  0    0    0      897    897    897    897    10.0E+04 11:00  03:00      532    609      1888    66    534  533  534  533          253 cps                  62    0    45  0  0    0    0      872    870    872    872    10.0E+04 11 :05 03:05      531    641      2363  100    533  532  533  532          233 cps                  94    0    45  0  0    0    0      865    865    865    865    10.0E+04 11:10  03:10      532    638      2298  100    534  533  534  533          215 cps                  91  84      70  0  0    0    0      870    872    870    870    .10.0E+04 11:15  03:15      532    638      2315  100    534  533  534  533          201 cps                  93  84      71  0  0    0    0      877    877    877    877    10.0E+04 11:20  03:20      534    633      2224  100    536  535  536  535          189 cps                  88  123      71  0  0    0    0      887    889    889    888      10.0E+04
~
N
 
SALEM GRADED EXERCISE (S93-03)  JUNE 23, 1993 REAL DRILL Tave TRUE    EOP-CFST-1 TIME TIME CTh+Tc)/2 T sat I PZR/RCS PRESS (PSIG)
PZR LEVEL (X)
                                                    #1 HOT LEGS (WR
                                                          #2    #3 (Deg) (Deg) (Deg)
RTD's) RX POWER/
                                                                      #4    N FLUX (Deg) CX/A/CPS)
SUB COOL MARGIN (DEG. F)
LTDWN CHARG SG LEVELS CNR)
FLOW FLOW #1 #2 #3 #4            # 1 SG PRESSURES
                                                                                                                                              # 2    # 3    #4
                                                                                                                                                                      #1 S/G FEED FLOW (GPM) (GPM) CX> CX) CX> CX) CPSIG) (PSIG) CPSIG) CPSIG) CX)(LBS/HR)
  ****** ***cc=*=======* ====*=    a======  =====  ===== ===== ===== ===== =========      ========= ===== ===== ==== ==== ==== ==== ======= ======= ======= ======= ===========
ACTUAL (CET)      IND                                                  ACTUAL 11:25 03:25        536    629      2178    100    538  537  538  537        169 cps        82  123    71    0    0    0    0    905    905    905    905    10.0E+04 11:30 03:30        538    627      2164    100    540  539  540  539        149 cps        78  122    71    0    0    0    0    925    923    924    923    10.0E+04 11:35 03:35        540    627      2163    99    542  541  542  541        129 cps        77  122    71    0    0    0    0    950    955    945    950    10.0E+04 11:40 03:40        541    623      2093    98    543  542  543  542        109 cps        n  121    71    0    0    0    0    950    955    945    950    10.0E+04 11:45 03:45        540    616      1988    97    542  541  542  541        100 cps        66  121    71    0    0    0    0    950    955    945    950    10.0E+04 11:50 03:50        540    611      1914    96    542  541  542  541        100 cps        61  120    71    0    0    0    0    950    955    945    950    10.0E+04 11:55 03:55        540    605      1844    95    542  541  542  541        100 cps        55  120    71    0    0    0    0    950    955    945    950    10.0E+04 12:00 04:00        540    598      1759    94    542  541  542  541        100 cps        48  119    71    0    0    0    0    950    955    945    950          0 12:05 04:05        540    596      1n4      93    542  541  542  541        100 cps        46  119    71    0    0    0    0    95.0    955    945    950          0 12:10 04:10        540    594      1696    92    542  541  542  541        100 cps        44  118    71    0    0    0    0    950    955    945    950          0 12:15 04:15        540    592      1674    91    542  541  542  541        100 cps        42  118    71    0    0    0    0    950    955    945    950          0 12:20 04:20        540    590      1656    90    542  541  542  541        100 cps        40  117    71    0    0    0    0    950    955    945    950          0 12:25 04:25        540    590      1646    89    542  541  542  541        100 cps        40  117    71    0    0    0    0    950    955    945    950          0 12:30 04:30        540    588      1636    88    542  541  542  541        100 cps        38  116    71    0    0    0    0    950    955    945    950          0 12:35 04:35        540    588      1626    87    542  541  542  541        100 cps        38  116    71    0    0    0    0    950    955    945    950          0 12:40 04:40        540    588      1616    86    542  541  542  541      : 100 cps        38  115    71    0    0    0    0    950    955    945    950          0 12:45 04:45        540    586      1606    85    542  541  542  541        100 cps        36  115    71    0    0    0    0    950    955    945    950          0 12:50  04:50      540    586      1596    84    542  541  542  541        100 cps        36  114    71    0    0    0    0    950    955    945    950          0 12:55  04:55      540    585      1586    83    542  541  542  541        100 cps        35  114    71    0    0    0    0    950    955    945    950          0 13:00  05:00      540    583      1576    82    542  541  542  541        100 cps        33  113    71    0    0    0    0    950    955    945    950          0 13:10  05:10      540    582      1566    81    542  541  542  541        100 cps        32  113    71    0    0    0    0    950    955    945    950.          0 13:15  05:15      540    581      1556    80    542  541  542  541        100 cps        31  112    71    0    0    0    0    950    955    945    950    10.0E+04 13:30  05:30      540    580      1546    79    542  541  542  541        100 cps        30  112    71    0    0    0    0    950    955    945    950    10.0E+04 13:45  05:45      540    580      1536    78    542  541  542  541        100 cps        30  111    71    0    0    0    0    950    955    945    950    10.0E+04 14:00  20:00      147    635        70    50    170  170  170  170        100 cps      454  75    71  33  33  33  33        0      0      0      0          0 14:15  20:15      147    635        70    50    170  170  170  170        100 cps      454  75    71  33  33  33  33        0      0      0      0          0 14:30  20:30      147    635        70    50    170  170  170  170        100 cps      454  75    71  33  33  33  33        0      0      0      0          0 14:45  20:45      147    635        70    50    170  170  170  170        100 cps      454  75    71  33  33  33  33        0      0      0      0          0 15:00  21:00      147    635        70    50    170  170  170  170        100 cps      454  75    71  33  33  33  33        0      0      0      0          0 15:15  21:15      147    635        70    50    170  170  170  170        100 cps      454  75    71  33  33  33  33        0      0      0      0          0 15:30  21 :30      147    635        70    50    170  170  170  170        100 cps      454  75    71  33  33  33  33.      0      0      0      0          0 16:00 22 00        147    635        70    50    170  170  170  170        100 cps      454  75    71  33  33  33  33        0      0      0      0          0 16:15 22 15        147    635        70    50    170  170  170  170        100 cps      454  75    71  33  33  33  33        0      0      0      0          0 16:30 22 30        147    635        70    50    170  170  170  170        100 cps      454  75    71  33  33  33  33        0      0      0      0          0 60
 
SALEM GRADED EXERCISE (S93-03)  JUNE 23, 1993
                  #2 S/G      #3 S/G      #4 S/G      AFWST WHUT WHUT WSTE MN OFFSTE 2 OR ECCS CTMT CTMT            SIGNIFICANT                SIGNIFICANT REAL DRILL FEED FLOW FEED FLOW FEED FLOW            LEVEL #1 #2 HOLD-UP POWER MORE ACT ISOL        ISOL          PLANT EVENTS              PLANT EVENTS TIME TIME (X)(LBS/HR) (X)(LBS/HR) (X)(LBS/HR)        <X> <X> (X)      <X> AVAIL DGs    7    7  CAPABLE          ( 1ST LINE)              (2ND LINE)
  ====== ================= =========== ===========    ===== ==== ==== ======= ===== ---- ---- ---- =======  ============================ =======================
08:00  00:00        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES          DRILL BEGINS 08:10  00:10        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 08:15  00:15        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 08:20  00:20        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 08:25  00:25        100  "      100  "      100 "  100  40  20  ' 10    YES  YES  NO  NO    YES                                        ALERT 08:30  00:30        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 08:35  00:35        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 08:40  00:40        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 08:45  00:45        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 08:50  00:50        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 08:55  00:55        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 09:00  01:00        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 09:05  01:05        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 09:10  01:10        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 09:15  01:15        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 09:20  01:20                                  100 "  100  40  20    10    YES  YES  NO  NO    YES                                    RELEASE STARTS 100  "      100  "                                      YES  YES  NO  NO    YES 09:25  01:25        100  "      100  "      100 "  100  40  20    10 09:30  01:30        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 09:35  01:35        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 09:40  01:40        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 09:45  01:45        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 09:50  01 :50        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 09:55  01:55        100  "      100  "      100 "  100  40  20    1.0  YES  YES  NO  NO    YES 10:00  02:00        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 10:05  02:05        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 10:10  02:10        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 10:15  02:15        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 10:20  02:20        100  "      100  "      100 "  100  40  20    10    YES  YES  NO  NO    YES 10:25  02:25                                  100 "  100  40  20    10    YES  YES  NO  NO    YES                                    RELEASE STOPPED 100  "      100  "                          30    12    YES  YES  NO  NO    YES          FEEDLI NE BREAK        LOSS OF FEED I ATWT 10:30  02:30        100  "      100  "      100 "  100  38 10:32  02:32                                          100  38  30    12    YES  YES  NO  NO    YES 85  "      85  "        85 "  100  38  30    12    YES  YES  YES  YES    YES 10:34  02:34          60  "      60  "        60 "
10:36  02:36                                          100  38  30    12    YES  YES  YES  YES    YES 10          10
                            " 10.0E+04          10
                                        " 10.0E+04  "  100  38  30    12    YES  YES  YES  YES    YES 10:38  02:38    20.0E+04 10:40  02:40    20.0E+04    10.0E+04    10.0E+04      100  38  30    12    YES  YES  YES  YES    YES 10:42  02:42    20.0E+04    10.0E+04    10.0E+04      100  38  30    12    YES  YES  YES  YES    YES 10:44  02:44    20.0E+04    10.0E+04    10.0E+04      100  38  31    12    YES  YES  YES  YES    YES        #22 AFW PUMP FAILS 10:45  02:45    10.0E+04    10.0E+04    10.0E+04      100  38  32    12    YES  YES  YES  YES    YES                                  SITE AREA EMERGENCY 10:50  02:50    10.0E+04    10.0E+04    10.0E+04      100  38  32    12    YES  YES  YES  YES    YES 10:55  02:55    10.0E+04    10.0E+04    10.0E+04      100  38  32    12    YES  YES  YES  YES    YES 11:00  03:00    10.0E+04    10.0E+04    10.0E+04      100  38  32    12    YES  YES  YES  YES    YES 11:05  03:05    10.0E+04    10.0E+04    10.0E+04      100  38  32    12    YES  YES  YES  YES    YES 11:10  03:10    10.0E+04    10.0E+04    10.0E+04      100  38  32    12    YES  YES  YES  YES    YES 11:15  03:15    10.0E+04    10.0E+04    10.0E+04      100  38  32    12    YES  YES  YES  YES    YES 11:20  03:20    10.0E+04    10.0E+04    10.0E+04      100  38  32    12    YES  YES  YES  YES    YES
~
..:c.
 
SALEM GRADED EXERCISE (S93-03)  JUNE 23, 1993
                  #2 S/G      #3 S/G      #4 S/G      AFMST MHUT MHUT MSTE MN OFFSTE 2 OR ECCS CTMT CTMT            'SIGNIFICANT              SIGNIFICANT REAL DRILL FEED FLOM FEED FLOM FEED FLOM          LEVEL  #1  #2 HOLD-UP POWER MORE ACT ISOL ISOL                PLANT EVENTS            PLANT EVENTS TIME TIME (X)(LBS/HR) (X)(LBS/HR) (X)(LBS/HR)      (X)  <X> <X>    <X> AVAIL DGs      7    ?  CAPABLE            (1ST LINE)              (2ND LINE)
  ====== ================= =========== ===========    ===== ==== ==== ======= ===== ---- ---- ---- =======  ============================ =======================
11:25  03:25    10.0E+04    10.0E+04    10.0E+04      100  38  32    12    YES  YES  YES YES    YES 11:30  03:30    10.0E+04    10.0E+04    10.0E+04      100  38  32    12    YES  YES  YES YES    YES 11 :35 03:35    10.0E+04    10.0E+04    10.0E+04      100  38  32    12    YES  YES  YES YES    YES 11:40  03:40    10.0E+04    10.0E+04    10.0E+04      100  38  32    12    YES  YES  YES YES    YES 11:45  03:45    10.0E+04    10.0E+04    10.0E+04      100  38  32    12    YES  YES  YES YES    YES 11:50  03:50    10.0E+04    10.0E+04    10.0E+04      99  38  32    12    YES  YES  YES YES    YES 11:55  03:55    10.0E+04    10.0E+04    10.0E+04      98  38  32    12    YES  YES  YES YES    YES 12:00  04:00          0          0            0      97  38  32    12    YES  YES  YES YES    YES        #23 AFM PUMP FAILS      TOTAL LOSS OF FEEDMATER 12:05  04:05          0          0            0      97  38  32    12    YES  YES  YES YES    YES 12:10  04: 10          0          0            0      97  38  32    12    YES  YES  YES . YES  YES 12:15  04:15          0          0            0      97  38  32    12    YES  YES  YES YES    YES 12:20  04:20          0          0            0      97  38  32    12    YES  YES  YES YES    YES 12:25  04:25          0          0            0      97  38  32    12    YES  YES  YES YES    YES 12:30  04:30          0          0            0      97  38  32    12    YES  YES  YES YES    YES 12:35  04:35          0          0            0      97  38  32    12    YES  YES  YES YES    YES 12:40  04:40          0          0            0      97  38  32    12    YES  YES  YES YES    YES                                  GENERAL EMERGENCY 12:45  04:45          0          0            0      97  38  32    12    YES  YES  YES YES    YES 12:50  04:50          0          0            0      97  38  32    12    YES  YES  YES  YES  YES 12:55  04:55          0          0            0      97  38  32    12    YES  YES  YES  YES  YES 13:00  05:00          0          0            0      97  38  32    12    YES  YES  YES  YES  YES 13:10  05:10          0          0            0      97  38  32    12    YES  YES  YES  YES  YES 13:15  05: 15  10.0E+04    10.0E+04    10.0E+04      97  38  32    12    YES  YES  YES  YES  YES 13:30  05:30    10.0E+04    10.0E+04    10.0E+04      97  38  32    12    YES  YES  YES  YES  YES 13:45  05:45    10.0E+04    10.0E+04    10.0E+04      97  38  32    12    YES  YES  YES  YES  YES 14:00  20:00          0          0            0      97  38  32    12    YES  YES  YES  YES  YES      RECOVERY IMPLEMENTED          SIX HOUR TIME 14:15  20:15          0          0            0      97  38  32    12    YES  YES  YES  YES  YES              EPIP 405              ACCELERATION 14:30  20:30          0          0            0      97  38  32    12    YES  YES  YES  YES  YES 14:45  20:45          0          0            0      97  38  32    12    YES  YES  YES  YES  YES 15:00  21:00          0          0            0      97  38  32    12    YES  YES  YES  YES  YES 15:15  21:15          0          0            0      97  38  32    12    YES  YES  YES  YES  YES 15:30  21 :30          0          0            0      97  38  32    12    YES  YES  YES  YES  YES        DRILL TERMINATED 16:00 22 00            0          0            0      97  38  32    12    YES  YES  YES  YES  YES      EXTRA DATA IF NEEDED 16:15 22 15            0          0            0      97  38  32    12    YES  YES  YES  YES  YES 16:30 22 30            0          0            0      97  38*  32    12    YES  YES  YES  YES  YES Q(\
 
SECTION 9.0 ARTIFICIAL ISLAND GRADED EXERCISE
* SECTION 9.1 893-03 ONSITE RADIOLOGICAL AND CHEMISTRY DATA TITLE SAMPLE ANALYSIS DATA PAGE RCS Concentrations (PASS)                    9 .1.1 Other Chemistry Sample Data                  9 .1. 8 containment sump concentrations              9 .1.10 Containment Atmosphere Concentrations        9 .1.15 Aux Building Atmosphere Concentrations        9.1.20 Leak Location Atmosphere Concentrations      9 .1. 28 Plant Vent Sample Isotopics and Dose Rates    9.1.36 9.2        RMS Data and Plant Vent Flow Rate Salem U/l Quick RMS Reference                9.2.1 Salem U/2 RMS Quick Reference                9.2.3
* Salem Elevation Maps With RMS Locations Plant Vent Flow Rate Radiation Monitoring System Data 9.2.5 9.2.10 9.2.12 9.3              Onsite Survey Map Data Inplant survey Maps                          9.3.1 9.4              ONSITE RADIOLOGICAL DATA onsite Field suvey Map                        9.4.1 Onsite Plume Centerline Data                  9.4.2 Onsite Specific Location Data                9.4.12
* 9 .* 0
* Clock Time Drill Time Reactor coolant System* concentrations I-131-uCi/cc Salem Nuclear Generating Station I-132 uci/cc 06/23/93 I-133 uCi/cc I-134 uCi/cc I-135 uCi/cc Total Iodine uci/cc 08:00 00:00  3.13E-Ol  4.75E-02  2.09E-Ol  4.95E-02  1. 06E-Ol 7.25E-Ol 08:15 00:15  3.13E-Ol  4.74E-02  2.09E-Ol  4.94E-02  1. OGE-01 7.24E-Ol 08:30 00:30  3.12E-Ol  4.74E-02  2.0SE-01  4.94E-02  1. 06E-Ol 7.24E-Ol 08:45 00:45  3.12E-Ol  4.74E-02  2.0SE-01  4.93E-02  1. OGE-01 7.23E-Ol 09:00 01:00  3.12E-Ol  4.73E-02  2.0SE-01  4.93E-02  1. OGE-01 7.22E-Ol 09:15 01:15  3.12E-Ol  4.73E-02  2.0SE-01  4.92E-02  .1. OGE-01 7.22E-Ol 09:20 01:20  3.12E-Ol  4.72E-02  2.0SE-01  4.92E-02  L OGE-01  7.21E-Ol 09:25 01:25  3.llE-01  4.72E-02  2.0SE-01  4.92E-02  1. OGE-01 7.21E-Ol 09:30 01:30  3.llE-01  4.72E-02  2.0SE-01  4.92E-02  1. OGE-01 7.21E-Ol 09:45 01:45  3.llE-01  4.72E-02  2.07E-Ol  4.91E-02  1. 05E-Ol 7.20E-Ol 10:00 02:00  3.llE-01  4.71E-02  2.07E-Ol  4.91E-02  1. 05E-Ol 7.20E-Ol 10:15 02:15  3.lOE-01  4.71E-02  2.07E-Ol  4.90E-02  1. 05E-Ol 7.19E-01 10:30 02:30  4.65E+Ol  7.06E+OO  3. lOE"+Ol 7.35E+OO  l.58E+Ol  l.08E+02 10:45 02:45  4.64E+02  6.53E+Ol  3.07E+02  6.0lE+Ol  l.54E+02  l.05E+03 11:00 03:00  4.64E+02  6.04E+Ol  3.04E+02  4.91E+Ol  l.49E+02  1. 03E+03 11:15 03:15  4.63E+02  5.59E+Ol  3.02E+02  4.02E+Ol  1. 46E+02 1. 01E+03 11:30 03:30  4.62E+02  5.17E+Ol  2.99E+02  3.28E+01  1.42E+02  9.87E+02 11:45 03:45  4.61E+02  4.78E+Ol  2.96E+02  2.68E+Ol  1. 38E+02 9.70E+02 12:00 04:00  4.60E+02  4.43E+Ol  2.93E+02  2.19E+Ol  1. 34E+02 9.54E+02 12:15 04:15  4.59E+02  4.lOE+Ol  2.90E+02  1.79E+Ol  l.31E+02  9.39E+02 12:30 04:30  4.59E+02  3.79E+Ol  2.88E+02  l.47E+01  1. 27E+02 9.26E+02 12:45 04:45  4.58E+02  3.51E+Ol  2.85E+02  1.20E+01  1. 24E+02 9.14E+02 13:00 05:00  4.57E+02  3.24E+Ol  2.82E+02  9.SOE+OO  l.21E+02  9.02E+02 13:15 05:15  4.56E+02  3.00E+Ol  2.80E+02  8.01E+OO  l.17E+02  8.91E+02 13:30 05:30  4.55E+02  2.78E+Ol  2.77E+02  6.55E+OO  1.14E+02  8.81E+02 20:15 12:15  2.89E+02  2.29E+OO  1. 43E+02  1. 94E-02  3.69E+Ol  4.71E+02 20:30 12: 30 2.89E+02  2.29E+OO  1. 43E+02  1.94E-02  3.69E+Ol  4.71E+02 20:45 12:45  2.88E+02  1. 96E+OO 1. 41E+02  1. 30E-02  3.51E+Ol  4.66E+02 21:00 13:00  2.88E+02  1. 96E+OO l.41E+02  1. 30E-02  3.51E+Ol  4.66E+02 21:15 13: 15 2.87E+02  l.56E+OO  l.37E+02  7.13E-03  3.24E+Ol  4.58E+02 21:30 13:30  2.87E+02  l.56E+OO  1. 37E+02  7.13E-03  3.24E+01  4.58E+02 21:45 13:45  2.87E+02  1. 34E+OO 1. 35E+02  4.77E-03  3.08E+01  4.54E+02 22:00 14:00  2.87E+02  1. 34E+OO 1. 35E+02  4.77E-03  3.08E+01  4.54E+02
* 9 .1.1
 
Clock Drill Time Time 08:00 00:00 DEI Reactor Coolant system **concentrations uCi/cc 3.58E-Ol Salem Nuclear Generating Station Kr-85 uci/cc 4.37E-03 06/23/93 Kr-87 uci/cc
: 1. OOE-01 Kr-88 uCi/cc 2.12E-02 Xe-131m uci/cc 2.42E-03 Xe-133 uci/cc 5.14E-01 08:15 00:15        3.58E-Ol  4.36E-03  1. OOE-01  2.12E-02  2.42E-03 5.13E-Ol 08:30 00:30        3.58E-Ol  4.36E-03  1. OOE-01  2.12E-02  2.41E-03 5.13E-Ol 08:45 00:45        3.57E-Ol  4.35E-03  9.99E-02  2.12E-02  2.41E-03 5.12E-Ol 09:00 01:00        3.57E-Ol  4.35E-03  9.98E-02  2.llE-02  2.41E-03 5.12E-Ol 09:15 01:15        3.57E-Ol  4.35E-03  9.97E-02  2.11E-02  2.41E-03 5.llE-01 09:20 01:20        3.57E-Ol  4.35E-03  9.97E-02  2.11E-02  2.41E-03 5.llE-01 09:25 01:25        3.56E-Ol  4.34E-03  9*. 97E-02 2.llE-02  2.41E-03 5.llE-01 09:30 01:30        3.56E-Ol  4.34E-03  9.96E-02  2.llE-02  2.40E-03 5.llE-01 09:45 01:45        3.56E-Ol  4.34E-03  9.95E-02  2.llE-02  2.40E-03 5.lOE-01 10:00 02:00        3.56E-Ol  4.33E-03  9.95E-02  2.llE-02  2.40E-03 5.lOE-01 10:15 02:15        3.55E-Ol  4.33E-03  9.94E-02  2.llE-02  2.40E-03 5.09E-Ol 10:30 02:30        5.33E+Ol  6.49E-Ol  1. 49E+Ol  3.15E+OO  3.59E-Ol 7.64E+Ol 10:45 02:45        5.29E+02  6.48E+OO  1.30E.f02  2.96E+Ol  3.59E+OO 7.62E+02 11:00 03:00        5.26E+02  6.48E+OO  1.13E+02  2.78E+Ol  3.58E+OO 7.60E+02 11:15 03:15        5.23E+02  6.47E+OO  9.85E+Ol  2.61E+Ol  3.58E+OO 7.58E+02 11:30 03:30        5.20E+02  6.47E+OO  8.59E+Ol  2.45E+Ol  3.57E+OO 7.57E+02 11:45 03:45        5.17E+02  6.46E+OO  7.48E+Ol  2.30E+Ol  3.57E+OO 7.55E+02 12:00 04:00        5.15E+02*  6.45E+OO  6.52E+Ol  2.16E+Ol  3.56E+OO 7.53E+02 12:15 04:15        5.12E+02  6.45E+OO  5.68E+Ol  2.03E+Ol  3.56E+OO 7.51E+02 12:30 04:30        5.10E+02  6.44E+OO  4.95E+Ol  L91E+Ol  3.55E+OO 7.50E+02 12:45 04:45        5.08E+02  6.44E+OO  4.31E+Ol  L79E+Ol  3.54E+OO 7.48E+02 13:00 05:00        5.06E+02  6.43E+OO  3.76E+Ol  L68E+Ol  3.54E+OO 7.46E+02 13:15 05:15        5.04E+02  6.42E+OO  3.28E+Ol  L58E+Ol  3.53E+OO 7.45E+02 13:30 05:30        5.02E+02  6.42E+OO  2.85E+Ol  L49E+Ol  3.53E+OO 7.43E+02 20:15 12:15        3.09E+02  8.34E+OO  4.70E-Ol  L83E+OO  2.27E+OO 4.65E+02 20:30 12:30        3.09E+02  8.34E+OO  4.70E-Ol  1.83E+OO  2.27E+OO 4.65E+02 2 0: 4 5- 12 : 4 5 3.08E+02  8.34E+OO. 3.58E-Ol  1.62E+OO  2.26E+OO 4.64E+02 21:00 13:00        3.08E+02  8.34E+OO  3.58E-Ol  1.62E+OO  2.26E+OO 4.64E+02 21:15 13:15        3.06E+02  8.34E+OO  2.37E-Ol  L34E+OO  2.26E+OO 4.62E+02 21:30 13:30        3.06E+02  8.34E+OO  2.37E-Ol  l.34E+OO  2.26E+OO 4.62E+02 21:45 13:45        3.0SE+02  8.34E+OO  1.SlE-01  1.19E+OO  2.26E+OO 4.61E+02 22:00 14:00        3.0SE+02  8.34E+OO  1.SlE-01  1.19E+OO  2.26E+OO 4.61E+02 9.1.2
* Clock Drill Reactor Coolant System Concentrations xe-133m Salem Nuclear Generating station Xe-135 06/23/93 Total Noble Gas Rb-88    Sr-89    Sr-90 Time  Time  uCi/cc    uci/cc    uCi/cc    uCi/cc  uCi/cc  uci/cc 08:00 00:00 4.78E-02  2.41E-02  7.14E-Ol 5.35E-04      < LLD  < LLD 08:15 00:15 4.78E-02  2.41E-02  7.13E-Ol 5.35E-04      < LLD  < LLD 08:30 00:30 4.77E-02  2.40E-02  7.13E-Ol 5.34E-04      < LLD  < LLD 08:45 00:45 4.77E-02  2.40E-02  7.12E-Ol 5.34E-04      < LLD  < LLD 09:00 01:00 4.77E-02  2.40E-02  7.llE-01 5.33E-04      < LLD  < LLD 09:15 01:15 4.76E-02  2.40E-02  7.llE-01 5.33E-04      < LLD  < LLD 09:20 01:20 4.76E-02  2.40E-02  7.lOE-01 5.32E-04      < LLD  < LLD 09:25 01:25 4.76E-02  2. 40E-.02 7.lOE-01 5.32E-04      < LLD  < LLD 09:30 01:30 4.76E-02  2.39E-02  7.lOE-01 5.32E-04      < LLD  < LLD 09:45 01:45 4.75E-02  2.39E-02  7.09E-Ol 5.32E-04      < LLD  < LLD 10:00 02:00 4.75E-02  2.39E-02  7.09E-Ol 5.31E-04      < LLD  < LLD 10:15 02:15 4.74E-02  2.39E-02  7.08E-Ol 5.31E-04      < LLD  < LLD 10:30 02:30 7.llE+OO  3.58E+OO  1. 06E+02  7.95E-02    < LLD  < LLD 10:45 02:45 7.08E+Ol  3.51E+Ol  1. 04E+03  4.43E-Ol 1. 88E-05  < LLD 11:00 03:00 7.05E+Ol  3.44E+Ol  l.02E+03 2.47E-Ol  1. 87E-05  < LLD 11:15 03:15 7.02E+Ol  3.37E+Ol  9.97E+02 1. 37E-Ol  1. 87E-05  < LLD 11:30 03:30 6.99E+Ol  3.31E+Ol  9.80E+02 7.66E-02  1. 87E-05  < LLD 11:45 03:45 6.96E+Ol  3.24E+Ol  9.65E+02 4.27E-02  1. 87E-05  < LLD 12:00 04:00 6.94E+Ol  3.lSE+Ol  9.51E+02 2.38E-02  1. 87E-05  < LLD 12:15 04:15 6.91E+Ol  3.11E+Ol  9.39E+02 1.32E-02  1.86E-05  < LLD 12:30 04:30 6.SSE+Ol  3.05E+Ol  9.28E+02 7.37E-03  1. 86E-05  < LLD
*                                                                  < LLD 12:45 04:45 6.85E+Ol  2.99E+Ol  9.17E+02 4.llE-03  1. 86E-05 13:00 05:00 6.82E+Ol  2.93E+Ol  9.08E+02 2.29E-03  1. 86E-05  < LLD 13:15 05:15 6.79E+Ol  2.SSE+Ol  9.00E+02 1. 27E-03  1. 86E-05  < LLD 13:30 05:30 6.77E+Ol  2.82E+Ol  8.92E+02 7.lOE-04  1.85E-05  < LLD 20:15 12:15 4.03E+Ol  1. lOE+Ol  5.29E+02    < LLD  1. 58E-05  < LLD 20:30 12:30 4.03E+Ol  1. lOE+Ol  5.29E+02    < LLD  l.58E-05  < LLD 20:45 12:45 4.0lE+Ol  1.06E+Ol  5.27E+02    < LLD  1.58E-05  < LLD 21:00 13:00 4.0lE+Ol  1. 06E+Ol  5.27E+02    < LLD  1.58E-05  < LLD 21:15 13:15 3.97E+Ol  1.00E+Ol  5.24E+02    < LLD  1.58E-05  < LLD 21:30 13:30 3.97E+Ol  1.00E+Ol  5.24E+02    < LLD  1.58E-05  < LLD 21:45 13:45 3.94E+Ol  9.63E+OO  5.22E+02    < LLD  1.58E-05  < LLD 22:00 14:00 3.94E+Ol  9.63E+OO  5.22E+02    < LLD  1.58E-05  < LLD
* 9.1. 3
 
Clock Time 08:00 Drill Time 00:00 Mo-99 uci/cc Reactor Coolant System*concentrations Salem Nuclear Generating Station Te-129 uci/cc.
4.60E-04 l.78E-03 06/23/93 Te-132 uCi/cc Cs-134 uci/cc cs-137 uCi/cc 7.66E-03 2.75E-03 l.07E-05 Ba-140 uci/cc
                                                                        < LLD 08:15    00:15 4.59E-04 l.78E-03      7.66E-03 2.75E-03 l.07E-05      < LLD 08:30    00:30 4.59E-04 l.77E-03      7.65E-03 2.74E-03 l.06E-05      < LLD 08:45    00:45 4.58E-04 l.77E-03      7.64E-03 2.74E-03 1.06E-05      < LLD 09:00    01:00 4.58E-04 l.77E-03      7.64E-03 2.74E-03 l.06E-05      < LLD 09:15    01:15 4.57E-04 l.77E-03      7.63E-03 2.74E-03 l.06E-05      < LLD 09:20    01:20 4.57E-04 1. 77E-03    7.63E-03 2.73E-03 1. 06E-05      < LLD 09:25    01:25 4.57E-04 1.77E-03      7.62E-03 2.73E-03 1. 06E-05      < LLD
.09:30    01:30 4.57E-04 1.77E-03      7.62E-03 2.73E-03 1. 06E-05      < LLD 09:45    01:45 4.57E-04 1.77E-03      7.61E-03 2.73E-03 1.06E-05      < LLD
*10: 00  02:00 4.56E-04 1. 76E-03    7.61E-03 .2.73E-03 1.06E-05      < LLD 10:15    02:15 4.56E-04 1.76E-03      7.60E-03 2.73E-03 1.06E-05      < LLD 10:30    02:30 6.83E-02 2.64E-Ol      1.14E+OO 4.0SE-01 1.59E-03    4.SOE-05 10:45    02:45 6.81E-Ol 2.27E+OO      1.14E.f01 4.0BE+OO 1.58E-02  4.79E-04 11:00    03:00 6.78E-Ol 1. 95E+OO
* 1.13E+Ol 4.0SE+OO 1.58E-02    4.78E-04 11:15    03:15 6.76E-Ol 1. 67E+OO    1.13E+Ol 4.07E+OO *1. 58E-02  4.78E-04 11:30    03:30 6.73E-Ol 1~44E+OO      1.12E+01 4.07E+OO 1.58E-02    4.77E-04 11:45    03:45 6.71E-Ol . 1.23E+OO    1.12E+01 4.07E+OO 1.58E-02    4.76E-04 12:00    04:00 6.69E-Ol 1.06E+OO      1.12E+01 4.06E+OO 1.58E-02    4.75E-04 12:15    04:15 6.66E-Ol 9.lOE-01      1.11E+Ol 4.06E+OO 1.57E-02    4.75E-04 12:30    04:30 6.64E-Ol 7.81E-Ol      1.11E+01 4.05E+OO 1.57E-02    4. 74E-04.
12:45    04:45 6. 62E-01 *. 6.71E-01  1.11E+Ol 4.* 0SE+OO 1..57E-02 4.73E-04 13:00    05:00 6.59E-Ol 5.76E-Ol      1.10E+01 4~05E+OO 1.57E-02    4.73E-04 13:15    05:15 6.57E-Ol 4.95E-01      1..10E+01 4.04E+OO 1.57E-02  4.72E-04 13:30    05:30 6.55E-Ol. 4.25E-01    1.lOE+Ol 4.04E+OO 1.57E-02    4.71E-04 20:15  .12:15 3.97E-Ol 4.73E-03      6.71E+OO .2.62E+OO 2.04E-02  3.04E-04 20:30    12:30 3.97E-Ol 4.73E-03      6.71E+OO .2. 62E+OO 2.04E-02  3.04E-04 20:45    12:45 3.94E-01 3.49E-03      6.68E+OO 2.62E+OO 2.04E-02    3.04E-04 21:00    13:00 3.94E-01 3.49E-03      6.68E+OO 2.62E+OO 2.04E-02    3.04E-04 21:15    13:15 3.91E-01 2.22E-03      6.63E+OO 2.62E+OO *2.04E-02  3.03E-04 21:30    13:30 3.91E-01 2 .22E-03. 6.63E+OO .2.62E+OO 2.04E-02*  3.03E-04 21:45    13:45 3.89E-01 1.64E-03      6.60E+OO 2.-62E+OO 2.04E-02  3.0JE-04 22:00    14:00 3.89E-Ol 1.64E-OJ      6.60E+OO 2.62E+OO 2.04E-02    3.0JE-04 9.1.4
* Clock Time Drill Time Reactor Coolant System Concentrations La-140 uci/cc Salem Nuclear Generating Station La-142 uCi/cc 06/23/93 Ce-144 uci/cc Total Particulate*
uCi/cc Gross Activity uci/cc 08:00  oo:oo      < LLD      < LLD      < LLD    1. 32E-02  1. 45E+OO 08:15  00:15      < LLD      < LLD      < LLD    1. 32E-02  1. 45E+OO 08:30  00:30      < LLD      < LLD      < LLD    1. 32E-02  1. 45E+OO 08:45  00:45      < LLD      < LLD      < LLD    1. 32E-02  1.45E+OO 09:00  01:00      < LLD      < LLD      < LLD    1. 31E-02  1. 45E+OO 09:15  01:15      < LLD      < LLD      < LLD    1. 31E-02  1. 45E+OO 09:20  01:20      < LLD      < LLD      < LLD    l.31E-02    l.44E+OO 09:25  01:25      < LLD      < LLD      < LLD    1. 31E-02  l.44E+OO 09:30  01:30      < LLD      < LLD      < LLD    1. 31E-02  l.44E+OO 09:45  01:45      < LLD      < LLD      < LLD    1. 31E-02  l.44E+OO 10:00  02:00      < LLD      < LLD      < LLD  .1. 31E-02  l.44E+OO 10:15  02:15      < LLD      < LLD      < LLD    1. 31E-02  l.44E+OO 10:30  02:30    l.SSE-05  l.55E-05      < LLD    l.96E+OO    2.16E+02 10:45  02:45    l.87E-04  1.39E-04    '<:: LLD  1. SSE+Ol  2.11E+03 11:00  03:00    1. 87E-04  l.24E-04      < LLD    1. 83E+Ol  2.06E+03 11:15  03: 15 ' l.86E-04  l.lOE-04      < LLD    1. 79E+Ol  2.02E+03 11:30  03:30  l.85E-04  9.86E-05      < LLD    1. 75E+Ol  l.98E+03 11:45  *03: 45  1. 84E-04  8.SOE-05      < LLD    1. 72E+Ol  l.95E+03 12:00  04:00  1. 83E-04  7.86E-05      < LLD    1. 70E+Ol  1. 92E+03 12:15  04:15    l.82E-04  7.02E-05      < LLD    1.68E+Ol    l.89E+03 12: 30 04: 30  l.SlE-04  6.27E-05      < LLD    1. 66E+Ol  l.87E+03 12:45  04:45    l.SOE-04  5.59E-05      < LLD    1. 65E+Ol  l.85E+03 13:00  05:00    l.79E-04  4.99E-05      < LLD    1.63E+Ol    l.SJE+OJ 13:15  05:15    1. 78E-04  4.46E-05      < LLD    1.62E+Ol    l.SlE+OJ 13:30  05:30    l.77E-04  3.98E-OS      < LLD    l.61E+Ol    l.79E+OJ  ,;
20:15  12:15    l.02E-04      < LLD      < LLD    9.7SE+OO    1. 01E+03 20:30  12: 30  l.02E-04      < LLD  .. < LLD    9.75E+OO    1.01E+03 20:45  12:45    1.02E-04      < LLD      < LLD    9.72E+OO    1.00E+OJ 21:00  13:00    1.02E-04      < LLD      < LLD    9.72E+OO    1.00E+OJ 21:15  13:15    l.OOE-04      < LLD      <LLD    9.67E+OO    9.92E+02 21:30  13:30    l.OOE-04      < LLD      < LLD    9.67E+OO    9.92E+02 21:45  13:45    9.93E-05      < LLD      < LLD    9.64E+OO    9.85E+02 22:00  14:00    9.9JE-05      < LLD      < LLD    9.64E+OO    9.85E+02 9.1.5
 
Clock Time Drill Time Reactor Coolant System Pass Sample Data VCTG-6 11 mR/hr Salem Nuclear Generating Station mR/hr 06/2:.:, /93 VCTG-24" Chill-2 11 mR/hr
* RC UNDIL. RC UNDIL. RC DILUT.
                                                          @ CONT. @ ONE FT.
mR/hr    mR/hr
                                                                              @ CONT.
mR/hr os-: 00 00:00    1. OSE+OO    < 0.2      7.16E+OO 2.95E+Ol        < 0.2    < 0.2 08:15  00:15    l.07E+OO      < 0.2      7.15E+OO 2.95E+Ol        < 0.2    < 0.2 08:30  00:30    l.07E+OO      < 0.2      7.15E+OO 2.94E+Ol        < 0.2    < 0.2 08:45  00:45    1. 07E+OO    < 0.2      7.14E+OO 2.94E+Ol        < 0.2    < 0.2 09:00  01:00    1.07E+OO      < 0.2      7.13E+OO 2.94E+Ol        < 0.2    < 0.2 09:15  01:15    1. 07E+OO    < 0.2      7.13E+OO 2.93E+Ol        < 0.2    < 0.2 09:20  01:20    1.07E+OO      < 0.2      7.12E+OO 2.93E+Ol        .< 0.2    < 0.2 09 :.25 01:25    1.07E+OO      < 0.2      7.12E+OO 2.93E+Ol        < 0.2    < 0.2 09:30  01:30    1.07E+OO      < 0.2      7.12E+OO 2.93E+Ol        < 0.2    < 0.2 09:45  01:45    l.07E+OO      < 0.2    7.llE+OO 2.93E+Ol        < 0.2    < 0.2 10:00  02:00    l.07E+OO      < 0.2    7.llE+OO 2.93E+Ol        < 0.2    < 0.2 10:15  02:15    1. 07E+OO      < 0.2    7 .10.E::t-00 2.92E+Ol    < 0.2    < 0.2 10:30  02:30    1.60E+02    1. 60E+Ol 1.06E+03 4.38E+03 l.18E+Ol 7.0lE-01 10:45  02:45    l.59E+03    l.59E+02 l.06E+04 4.27E+04 l.15E+02 6.84E+OO 11:00  03:00    1.58E+03    l.58E+02 l.05E+04 4.18E+04 1.12E+02 6.68E+OO 11:15  03:15    l.57E+03    1.57E+02 l.04E+04 4.09E+04 1.10E+02 6.55E+OO 11:30  03:30    1.56E+03    1.56E+02 1. 04E+04 4.01E+04 l.08E+02 6~42E+OO 11:45  03:45    1.55E+03    l.55E+02 l.03E+04 3.94E+04 l.06E+02 6.31E+OO 12:00  04:00    l.54E+03    l.54E+02 1. 03E+04 3.88E+04 l.04E+02 6.21E+OO 12:15  04:15    l.54E+03    l.54E+02 l.02E+04 3.82E+04 l.03E+02 6.llE+OO 12:30  04:30    1 .* 53E+03  l.53.E+02 l.02E+04 3.77E+04 1.01E+02. 6.03E+OO 12:45  04: 4*5  l.52E+03    l.52E+02 1.01E+04 3.72E+04 9.99E+Ol 5.95E+OO 13:00  05:00    l.52E+03    1.52E+02 1.01E+04
* 3.67E+04 9.87E+Ol 5.87E+OO 13:15  05:15    l.51E+03    l.51E+02 1. 01E+04 3.62E+04 9.75E+Ol . 5.SOE+OO 13:30  05:30  *l.51E+03    l.51E+02 l.OOE+04 3.58E+04 9.63E+Ol 5.73E+OO 20:15  12:15    9.26E+02    9.26E+Ol 6~17E+03 l.92E+04 5.15E+Ol 3.06E+OO 20:30  12:30    9.26E+02    9.26E+Ol 6.17E+03 l.92E+04 5.15E+Ol 3.06E+OO 20:45  12:45    9.23E+02    9.23E+01 6.15E+03 1.89E+04 5.lOE+Ol 3.03E+OO 21:00  13:00    9.23E+02    9.23E+Ol 6.15E+03 l.89E+04 5.lOE+Ol 3.03E+OO 21:15  13:15  .9.19E+02    9.19E+01 6.12E+03 1.86E+04 5.0lE+Ol 2.98E+OO 21:30  13:30    9.19E+02    9 .19E+Ol . 6.12E+03 1.86E+04 5.0lE+Ol* 2.98E+OO 21:45  13:45    9.16E+02    9.16E+Ol 6.10E+03 l.85E+04 4.96E+Ol 2.95E+OO 22:00  14:00    9.16E+02    9.16E+01 6.10E+03 1.85E+04 4.96E+Ol 2.95E+OO 9.1.6
* Clock  Drill Reactor Coolant System Pass Sample Data Salem Nuclear Generating Station 06/23/93 RC DILUT. S.GAS @C S.GAS DIL
                @ ONE FT.UNDILUTED    1:15000 Time  Time      mR/hr      mR/hr    mR/hr 08:00  00:00  < 0.2      < 0.2    < 0.2 08:15  00:15  < 0.2      < 0.2    < 0.2 08:30  00:30  < 0.2      < 0.2    < 0.2 08:45  00:45  < 0.2      < 0.2    < 0.2 09:00  01:00  < 0.2      < 0.2    < 0.2 09:15  01:15  < 0.2      < 0.2    < 0.2 09:20  01:20  < 0.2      < 0.2    < 0.2
  . 09: 25 01:25  < 0.2      < 0.2    < 0.2 09:30  01:30  < 0.2      < 0.2    < 0.2 09:45  01:45  < 0.2      < 0.2    < 0.2 10:00  02:00  < 0.2      < 0.2    < 0.2 10:15  02:15  < 0.2      < 0.2    < Q. _;2 10:30  02:30  < 0.2    1.16E+OO  < 0.2 10:45  02:45  < 0.2    1.14E+Ol  3.47E-Ol 11:00  03:00  < 0.2    l.llE+Ol  3.40E-Ol 11:15  03:15  < 0.2    1.09E+Ol  3.34E-Ol 11:30  03:30  < 0.2    1. OSE+Ol 3.28E-Ol 11:45  03:45  -< 0.2    l.06E+Ol  3.23E-Ol 12:00  04:00  < 0.2    l.04E+Ol  3.19E-Ol 12:15  04:15  <  0.2    1.0JE+Ol  3.14E-Ol 12:30  04:30  <  0.2    l.02E+Ol 3.llE-01 12:45  04:45  < 0.2    1.0lE+Ol  3.07E-Ol 13:00  05:00  <  0.2    9.96E+OO  3.04E-Ol 13:15  05:15  <  0.2    9.87E+OO  3.0lE-01 13:30  05:30  <  0.2    9.79E+OO  2.99E-Ol 20:15  12:15  <  0.2    5.81E+OO  < 0.2 20:30  12:30  <  0.2    5.SlE+OO  < 0.2 20:45  12:45  <  0.2    5.78E+OO  < 0.2 21:00  13:00  <  0.2    5.78E+OO  < 0.2 21:15  13:15  <  0.2    5.74E+OO  < 0.2 21:30  13:30  <  0.2    5.74E+OO  < 0.2 21:45  13:45  <  0.2    5.72E+OO  < 0.2 22:00  14:00  <  0.2    5.72E+OO  < 0.2 9.1. 7
 
Clock Drill Time Time            PPM    PPB Chemistry Da~a Salem Nuclear Generating station 06/23/93 Boron Chlorides Conductivity Dissolved 02 RCS PH Sulfate us/cm        PPB      s.u. PPB 08:00 00:00          584.0  7.00      22.000      < 5.0      6.6    3.00 08:15 00:15          584.0  7.00      22.000      < 5.0      6.6    3.00 08:30 00:30          584.0  7.00      22.000      < 5.0      6.6    3.00 08:45 00:45          584.0  7.00      22.000      < 5.0      6.6    3.00 09:00 01:00          584.0  7.00      22.000      < 5.0      6.6    3.00 09:15 01:15          584.0  7.00      22.000      < 5.0      6.6    3.00 09:30 01:30          584.0  7.00      22.000      < 5.0      6.6    3.00 09:45 01:45          584.0  7.00      22.000      < 5.0      6.6    3.00 10:00 02:00          584.0  7.00      22.000      < 5.0      6.6    3.00 10:15 02:15          584.0  7.00      22.000      < 5.0      6.6    3.00 10:30 02:30          900.0  7.00      20.800      < 5.0      6.5    3.00 10:45 02:45        1100.0  7.00      19.000    *< 5.0        6.4    3.00 11:00 03:00        1300.0  7.00      18. OQO,.    < 5.0      6.1    3.00 11:15 03:15        1500.0  7.00      17.800      < 5.0      6.0    3.00 11:30 03:30        1675.7  7.00      17.800      < 5.0      6.0    3.00 11:45 03:45        1851. 3  7.00      17.800      < 5.0      6.0    3.00 12:00 04:00        2027.0  7.00      17.800      < 5.0      6.0    3.00 12:15 04:15        2027.0  7.00      17.800      < 5.0      6.0    3.00 12:30 04:30        2027.0  7.00      17.800      < 5.0      6.0    3.00 12:45 04:45        2027.0  7.00      17.800      < 5.0      6.0    3.00 13:00 05:00        2027.0  7.00      17.800      < 5.0      6.0    3.00 13:15 05:15        2027.0  7.00      17.800      < 5.0      6.0 3.00 13:30 05:30        2027.0  7.00      17.'800      < 5.0      6.0    3.00 20:15 12:15        2027.0  7.00      17.800    '< 5.0        6.0    3.00 20:30 12:30        2027.0  7.00      17.800      < 5.0      6.0    3.00 20:45 12:45        2027.0  7.00      17.800      < 5.0      6.0    3.00 21 : 0 0 --13 : 0 0 2027.0  7.00      17.800      < 5.0      6.0    3.00 21:15 13:15        2027.0  7.00      17.800      < 5.0      6.0    3.00 21:30 13: JO
* 2027.0  7.00      17~800      < 5.0      6.0    3.00 21:45 13:45        2027.0  7.00      17.800      < 5.0      6.0    3.00 22:00 14:00        2027.0  7.00      17.800      < 5.0      6.0    3.00 9.1.8                                *
* Clock  Drill  Lithium Chemistry Data Salem Nuclear Generating station Fluoride 06/23/93 S/G Ph S/G Chloride Suspended Solids cat Ion conductivity Time  Time    PPM        PPB      s.u.        PPB      PPB      uS/cm 08:00  00:00  2.100        2.0      8.9        6.00    200.0      0.100 08:15  00:15  2.100        2.0      8.9        6.00    200.0      0.100 08:30  00:30  2.100        2.0      8.9        6.00    2.00. 0    0.100 08:45  00:45  2.100        2.0      8.9        6.00    200.0      0.100 09:00  01:00  2.100        2.0      8.9        6.00    200.0      0.100 09:15  01:15  2.100        2.0      8.9        6.00  . 200. 0      0.100 09:30  01:30  2.100        2.0      8.9        6.00    200.0      0.100 09:45  01:45  2.100        2.0      8.9        6.00    200.0      0.100 10:00  02:00  2.100        2.0      8.9        6.00    200.0      0.100 10:15  02:15  2.100        2.0      8.9        6.00    200.0      0.100 10:30  02:30  2.000        2.0      8.9        6.00    200.0      0.100 10:45  02:45  1.900        2.0      8. 9. '    6.00    200.0      0.100 11:00  03:00  1.800        2.0      8.9        6.00    200.0      0.100 11:15  03:15  1.750        2.0      8.9        6.00    200.0      0.100 11:30  03:30  1. 750      2.0      8.9        6.00    200.0      0.100 11:45  03:45  1. 750      2.0      8.9        6.00    200.0      0.100 12:00  04:00  1. 750      2.0      8.9        6.00    200.0      0.100 12:15  04:15  1. 750      2.0      8.9        6.00    200.0      0.100 12: 30 04:30  1. 750      2.0      8.9        6.00    200.0      0.100 12:45  04:45  1. 750      2.0      8.9        6.00    200.0      0.100 13:00  05:00  1. 750      2.0      8.9        6.00    200.0      0.100 13:15  05:15  1. 750      2.0      8.9        6.00    200.0      0.100 13:30  05:30  1. 750      2.0      8.9        6.00    200.0      0.100 20:15  12:15  1. 750      2.0      8.9        6.00    200.0      0.100 20:30  12: 30  1. 750      2.0      8.9        6.00    200.0      0.100 20:45  12:45  1. 750      2.0      8.9        6.00    200.0      0.100 21:00  13:00  1. 750      2.0      8.9        6.00  . 200. 0      0.100 21:15  13:15  1. 750      2.0      8.9        6.00    200.0      0.100 21:30  13:30  1. 750      2.0      8.9        6.00    200.0      0.100 21:45  13:45  1. 750      2.0      8.9        6.00    200.0      0.100 22:00  14:00  1. 750      2.0      8.9        6.00    200.0      0.100
* 9.1.9
 
containment sump Concentrations Salem Nuclear Generating Station 06/23/93 Total Clock Drill        I-131        I-132      I-133    I-134    I-135      Iodine
'l"'.
... irne '-:: ime  uCi/cc        uCi/cc      uci/cc    uCi/cc    uci/cc      uci/cc 08:00 00:00        2.47E-04      3.75E-05 l.65E-04    3.91E-05  8.38E-05 5.73E-04 08:15 00:15        2.43E-04      3.69E-05 l.62E-04    3.85E-05  8.25E-05 5.64E-04 08:30 00:30        2.40E-04      3.64E-05 1. 60E-04    3.79E-05  8.13E-05 5.55E-04 08:45 00:45        2.36E-04      3.58E-05 l.57E-04    3.73E-05  8.00E-05 5.46E-04 09:00 01:00        2.32E-04      3.53E-05 l.55E-04    3.67E-05  7.SSE-05 5.38E-04 09:15 01:15        2.29E-04      3.47E-05 1. 53E-04    3.62E-05  7.76E-05 5.30E-04 09:20 01:20        2.28E-04      3.46E-05 l.52E-04    3.60E-05  7_-73E-05 5.28E-04 09:25 01:25        2.27E-04      3.44E-05 1. 51E-04    3.58E-05  7.69E-05 5.25E-04 09:30 01:30        2.26E-04      3.42E-05 1. 50E-04    3.56E-05  7.65E-05 5.22E-04 09:45 01:45        2.22E-04      3.37E-05 1. 48E-04    3.51E-05  7.54E-05 5.15E-04 10:00 02:00        2.19E-04      3.32E-05 l.46E-04    3.46E-05  7.43E-05 5.0SE-04 10:15 02:15        2.16E-04      3.28E-05 l.44E-04    3.41E-05  7.33E-05 5.00E-04 10:30 02:30        3.20E-02      4.85E-03    2.13E-02  5.05E-03  l.OSE-02 7.40E-02 10:45 02:45      3.15E-Ol      4.43E-02 2. OSE-'bl  4.07E-02  1. 04E-Ol  7.12E-Ol 11:00 03:00      3.lOE-01      4.04E-02 2.04E-Ol    3.29E-02  1. OOE-01  6.88E-Ol 11:15 03:15      3.06E-Ol      J.69E-02    1. 99E-Ol 2.65E-02  9.62E-02 6.65E-Ol 11:30 03:30      3.02E-Ol      J.38E-02 1. 95E-Ol    2.14E-02  9.25E-02 6.44E-Ol 11:45 03:45      2.97E-Ol      3.09E-02 1. 91E-Ol    1. 73E-02 8.89E-02 6.25E-Ol 12:00 04:00      2.93E-Ol      2.82E-02 1. 87E-Ol    1. 40E-02 8.55E-02 6.0SE-01 12:15 04:15      2.89E-Ol      2.58E-02 l.83E-Ol    l.13E-02  8.23E-02 5.91E-Ol 12:30 04:30      2.85E-Ol      2.36E-02 1. 79E-Ol    9.12E-03  7.91E-02 5.76E-Ol 12:45 04:45      2.SlE-01      2.16E-02 1. 75E-Ol    7.37E-03  7.61E-02 5.62E-Ol 13:00 05:00      2.78E-Ol      1.97E-02 l.72E-Ol    5.96E-03  7.33E-02 5.48E-Ol 13:15 05:15      2.74E-Ol      1.SOE-02 1. 68E-Ol    4.SlE-03  7.05E-02 5.35E-Ol 13:30 05:30      2. 70E...;Ol  1. 65E-02 . 1. 65E-Ol 3.89E-03  6.79E-02 5.23E-Ol 20:15 12:15      l.98E-Ol      1. 55E-0:3 9.78E-02  1. 29E-05 2.52E-02 3.22E-Ol 20:30 12:30      l.95E-Ol      1. 42E-03  9.60E-02  l.05E-05  2.43E-02 3.17E-Ol 20:45 12:45      1. 93E-Ol    1. 31E-03 ~;f. 43E-02 8.SlE-06  2.35E-02 J.13E-Ol 21:00 13:00      1. 91E-Ol    1. 20E-03 9.26E-02    6.90E-06  2.26E-02 J.OSE-01 21:15 13:15      1. 90E-Ol    1. lOE-03 9.lOE-02    5.59E-06  2 .19E-02
* 3.04E-Ol 21:30 13:30      1. SSE-01    1. OlE-03  8.94E-02  4.SJE-06  2.llE-02 2.99E-Ol 21:45. 13:45      1. 86E-Ol    9.25E-04 8.78E-02    3.68E-06  2.04E-02 2. 95E-Ol
* 22:00 14:00      l.84E-Ol      8.49E-04 8.63E-02    2.98E-06  1. 97E-02 2. 91E-Ol*
9.1.10
 
Containment sump Concentrations Salem Nuclear Generating station 06/23/93 Clock    Drill  DEI        Kr-85      Kr-87    Kr-BB    Xe-13lm  Xe-133 Time    Time    uci/cc    uCi/cc    uci/cc    uCi/cc    uCi/cc    uCi/cc
  'J3:00  00:00  2.B3E-04    <  LLD  :..OOE-06    < LLD    < LLD    < LLD 08:15    00:15  2.79E-04      < LLD  9.86E-07      < LLD    < LLD    < LLD 08:30    00:30  2.74E-04    <  LLD  9.71E-07      < LLD    < LLD    < LLD 08:45    00:45  2.70E-04    <  LLD  9.56E-07      < LLD    < LLD    < LLD 09:00    01:00  2.66E-04    <  LLD  9.42E-07      < LLD    < LLD    < LLD 09:15    01:15  2.62E-04    <  LLD  9.28E-07      < LLD    < LLD    < LLD 09:20    01:20  2.61E-04    <  LLD  9.23E-07      < LLD    < LLD    < LLD 09:25    01:25  2.60E-04    <  LLD  9.19E-07      < LLD    < LLD    < LLD 09:30    01:30  2.58E-04    <  LLD  9.14E-07      < LLD    < LLD    < LLD 09:45    01:45  2.55E-04    <  LLD  9.0lE-07      < LLD    < LLD    < LLD 10:00    02:00  2.51E-04    <  LLD  8.88E-07      < LLD    < LLD    < LLD 10:15    02:15  2.47E-04    <  LLD  8.75E-07      < LLD    < LLD    < LLD 10:30    02:30  3.66E-02    <  LLD  1. 29E-04  2.74E-05    < LLD  6.64E-04 10:45    02:45  3.59E-Ol    <  LLD  1. llE-03  2.54E-04  3.0SE-05  6.54E-03 11:00    03:00  3.52E-Ol      < LLD  9. 58E-04  2.36E-04  3.04E-05  6.44E-03 ll.:15  03:15  3.45E-Ol      < LLD  3.25E-04  2.19E-04  2.99E-05  6.35E-03
::..l:JO OJ:JO  3.J9E-Ol      < LLD  7.lOE-04  2.03E-04  2.95E-05  6.25E-03 11:45    03:45  3.33E-Ol      < LLD  6.llE-04  l.88E-04  2.91E-05  6.16E-03 12:00    04:00  3.28E-Ol      < LLD  5.26E-04  1. 75E-04 2.87E-05  6.07E-03 12:15    04:15  3.22E-Ol      < LLD  4.53E-04  l.62E-04  2.83E-05  5.99E-03 12:30    04:30  3.17E-Ol      < LLD  3.90E-04  1. 50E-04 2.SOE-05  5.90E-03 12:45    04:45  3.12E-Ol    <  LLD  3.36E-04  1.40E-04  2.76E-05  5.82E-03 13:00    05:00  3.07E-Ol    <  LLD  2.89E-04  1. 30E-04 2.72E-05  5.74E-03
* 13: 15  05: 15 3.03E-Ol    <  LLD  2.49E-04  l.20E-04  2.69E-05  5.66E-03 13:30    05:30  2.98E-Ol    <  LLD  2.15E-04  1.12E-04  2.65E-05  5.59E-03 20:15    12:15  2.llE-01      < LLD  4.00E-06  l.57E-05  1. 95E-05 4.03E-03 20:30    12:30  2.09E-Ol      < LLD  3.46E-06  1. 46E-05 l.93E-05  3.98E-03 20:45    12:45  2.07E-Ol      < LLD  2*. 99E-06 l.36E-05  1. 91E-05 3.94E-03 21:00    13:00  2.04E-Ol      < LLD  2*~ 58E-06 1. 27E-05 l.89E-05  3.90E-03 21:15    13:15  2.02E-Ol      < LLD  2.23E-06  l.lSE-05  l.SSE-05  3.86E-03 21:30    13:30  2.00E-01      < LLD  1. 93E-06  1. lOE-05 1. 86E-05 3.82E-03 21:45    13:45  1. 98E-Ol    <  LLD  1. 67E-06  1.0JE-05  1.84E-05  3.78E-03 22:00    14:00  1. 96E~o1    < LLD  1. 44E-06  9.55E-06  1.82E-05  3.74E-03
* 9.1.11 I
 
containmen~ sump Concentrations Salem Nuclear Generating Station 06/23/93 Total Clock  Drill    Xe-133m    Xe-135    Noble Gas Rb-88    sr-89  Sr-90 Time    Time      uCi/cc      uCi/cc    uCi/cc    uCi/cc  uci/cc  uCi/cc 08:00  00:00    4.78E-07      < LLD  7.14E-06    < LLD  < LLD  < LLD 08:15  00:15    4.71E-07      < LLD  7.03E-06    < LLD  < LLD  < LLD 08:30  00:30    4.64E-07      < LLD  6.92E-06    < LLD  < LLD  < LLD 08:45  00:45    4.56E-07      < LLD  6.SlE-06    < LLD  < LLD  < LLD 09:00  01:00    4.SOE-07      < LLD  6.71E-06    < LLD  < LLD  < LLD 09:15  01:15    4.43E-07      < LLD  6.61E-06    < LLD  < LLD  < LLD 09:20  01:20    4.41E-07      < LLD  6.58E-06    < LLD  < LLD  < LLD 09:25  01:25    4.39E-07      < LLD  6.54E-06    < LLD  < LLD  < LLD 09:30  01:30    4.36E-07*      < LLD  6.51E-06    < LLD  < LLD  < LLD 09:45  01:45    4.30E-07      < LLD  6.42E-06    < LLD  < LLD  < LLD 10 :*00 02:00    4.24E-07      < LLD  6.33E-06    < LLD  < LLD  < LLD 10:15  02:15    4.lSE-07      < LLD  6.24E-06    < LLD  < LLD  < LLD 10:30  02:30    6.lSE-05    3.llE-05  9.23E-04 6.85E-05    < LLD  < LLD 10:45  02: 45 . 6.0SE-04    3.0lE-04  8.90E..zo3 3.76E-04  < LLD*  < LLD 11:00  03:00    5.98E-04    2.91E-04  S.61E-03 2.07E-04    < LLD  < LLD 11:15  03:15    5.88E-04    2. 82E-04. 8.34E-03 1.14E-04    < LLD  < LLD 11:30  03:30    5.78E-04    2.73E-04  8.lOE-03 6.27E-05    < LLD  < LLD 11:45  03:45'  5.69E-04    2.65E-04  7.SSE-03 3.45E-05    < LLD  < LLD 12:00  04:00    5.59E-04    2.56E-04  7.67E-03    < LLD  < LLD  < LLD 12:15  04:15    5.SOE-04    2.48E-04  7.48E-03    < LLD  < LLD  < LLD 12:30  04:30    5.42E-04    2.40E-04  7.30E-03    < LLD  < LLD  < LLD 12:45  04:45    5.33E-04    2.33E-04  7.14E-03    < LLD  < LLD  < LLD 13:00  05:00    5.25E-04    2.26E-04  6.99E-03    < LLD  < LLD  < LLD 13: 15* 05:15    5.17E-04    2*.19E-04  6.84E-03    < LLD  < LLD  < LLD 13: 30  05:30    5.09E-04    2.12E-04  6.71E-03    < LLD  < LLD  < LLD 20:15  12:15    3.49E-04    9.SlE-05  4.SSE-03    < LLD  < LLD  < LLD 20:30  12:30    3.45E-04    9.24E-05  4.49E-03    < LLD  < LLD  < LLD 20:45  12:45    3.40E-04    8.98E-05  4.44E-03    < LLD  < LLD  < LLD 21:00  13:00    3.36E-04    8.73E-05  4~39E-03    < LLD  < LLD  < LLD 21:15  13: 15  3.32E-04    8.49E-05  4.34E-03    < LLD  < LLD  < LLD 21:30  13:30    3.28E-04    8.25E-05  4.29E-03    < LLD  < LLD  < LLD 21:45  13:45    3. 24E-04 . 8.02E-05  4.25E-03    < LLD  < LLD  < LLD 22:00  14:00    3.20E-04    7.SOE-05  4.20E-03    < LLD  < LLD  < LLD 9.1.12
 
Containment Sump Concentrations Salem Nuclear Generating Station 06/23/93 Clock  Drill  Xo-99    Te-129    Te-132    Cs-134    Cs-137  Ba-140 Time  Time  uci/cc    uCi/cc  uCi/cc    uci/cc    uCi/cc  uCi/cc
  'JS:OO 00:00    < LLD    < LLD  7.59E-06  2.72E-06    < LLD  < LLD 08:15  00:15    < LLD    < LLD  7.47E-06  2.68E-06    < LLD  < LLD 08:30  00:30    < LLD    < LLD  7.35E-06  2.64E-06    < LLD  < LLD 08:45  00:45    < LLD    < LLD  7.24E-06  2.60E-06    < LLD  < LLD 09:00  01:00    < LLD    < LLD  7.13E-06  2.56E-06    < LLD  < LLD 09:15  01:15    < LLD    < LLD  7.03E-06  2.52E-06    < LLD  < LLD 09:20  01:20    < LLD    < LLD  6.99E-06  2.51E-06    < LLD  < LLD 09:25  01:25    < LLD    < LLD  6.96E-06  2.49E-06    < LLD  < LLD 09:30  01:30    < LLD    < LLD  6.92E-06  2.48E-06    < LLD  < LLD 09:45  01:45    < LLD    < LLD  6.82E-06  2.45E-06    < LLD  < LLD 10:00  02:00    < LLD    < LLD  6. 72.E-06 2.41E-06    < LLD  < LLD 10:15  02:15    < LLD    < LLD  6.63E-06  2.38E-06    < LLD  < LLD 10:30  02:30 5.88E-05  2.27E-04  9.SlE-04  3.52E-04.    < LLD  < LLD 10:45  02:45 5.78E-04  1. 93E-03 9.65E-03  3.47E-03  1. 35E-05  < LLD 11:00  03:00 5.69E-04  l.63E-03  9.50EJ:.03 3.42E-03  1.33E-05  < LLD l.1:15 03:15 5.60E-04  1. 39E-03 9.35E-03  3.37E-03  l.31E-05  < LLD 11:30  03:30 5.51E-04  l.18E-03  9.20E-03  3.33E-03  l.29E-05  < LLD 11:45  03:45 5.42E-04  9.97E-04  9.06E-03  3.29E-03  l.28E-05  < LLD 12:00  04:00 5.34E-04  8.46E-04  8.92E-03 3.24E-03    1. 26E-05  < LLD 12:15  04:15 5.26E-04  7.lSE-04  8.79E-03  3.20E-03  1.24E-05  < LLD 12:30  04:30 5.18E-04  6.09E-04  8.66E-03  3.16E-03  1.23E-05  < LLD 12:45  04:45 5.lOE-04  5.17E-04  8.53E-03 3.12E-03    l.21E-05  < LLD 13:00  05:00 5.02E-04  4.39E-04  8.41E-03 3.0SE-03    1. 20E-05  < LLD 13:15  05:15 4.95E-04  3.72E-04  8.28E-03 3.04E-03    l. lSE-05  < LLD 13:30  05:30 4.87E-04  3.16E-04  8.16E-03 3.0lE-03    l.17E-05  < LLD 20:15  12:15 3.40E-04  3.97E-06  5.75E-03 2.25E-03    8.73E-06  < LLD 20:30  12:30 3.36E-04  3.JSE-06  5.69E-03 2.23E-03    8.65E-06  < LLD 20:45  12:45 J.32E-04  2.SSE-06  5.62E-03  2.21E-03  8.57E-06  < LLD 21:00  13:00 3.28E-04    < LLD  5.55E-03  2.19E-03  8.49E-06  < LLD 21:15  13:15 3.24E-04    < LLD  5.49E-03 2.17E-03    8.41E-06  < LLD 21:30  13:30 3.20E-04    < LLD  5.43E-03 .2.lSE-03  8.33E-06  < LLD 21:45  13:45 3.17E-04    < LLD  5.37E-03 2.13E-03    8.26E-06  < LLD 22:00  14:00 3.13E-04    < LLD  5.31E-03 2.llE-03    8.lSE-06  < LLD
* 9.1.13
 
Containment sump Concentrations Salem Nuclear Generating Station 06/23/93 Total    Gross Clock  Drill  La-140    La-142    Ce-144  Particulate Activity Time    '!' ime uCi/cc    uCi/cc    uCi/cc    uCi/cc    uCi/cc 08:00  00:00    < LLD      < LLD      < LLD  1. 31E-05  5.93E-04 08:15  00:15    < LLD      < LLD      < LLD  1.29E-05  5.84E-04 08:30  00:30    < LLD      < LLD      < LLD  1. 27E-05  5.75E-04 08:45  00:45    < LLD      < LLD      < LLD  1. 25E-05  5.66E-04 09:00    01:00  < LLD      < LLD      < LLD  l.23E-05  5.57E-04 09:15    01:15  < LLD      < LLD      < LLD  l.21E-05  5.49E-04 09:20    01:20  < LLD      < LLD      < LLD  1. 20E-05  5.46E-04 09:25    01:25  < LLD      < LLD      < LLD  1. 20E-05  5.44E-04 09:30    01:30  < LLD      < LLD      < LLD  l.19E-05  5.41E-04 09": 45  01:45  < LLD      < LLD      < LLD  1.17E-05  5.33E-04 10:00    02:00  < LLD      < LLD      < LLD  l.16E-05  5.25E-04 10:15    02:15  < LLD      < LLD      < LLD  1.14E-05  5.18E-04 10:30    02:30  < LLD      < LLD      < LLD  1.69E-03  7.66E-02 10:45    02:45  < LLD      < LLD      < LLD  l.GOE-02  7.37E-Ol 11:00    03:00  < LLD      < LLD      < LLD  l.53E-02  7.12E-Ol 11:15    03:15  < LLD      < LLD      < LLD  1.48E-02  6.88E-Ol 11:30    03:30  .< LLD.    < LLD      < LLD  1.43E-02  6.67E-Ol 11:45    03:45  < LLD      < LLD      < LLD  1. 39E-02  6.47E-Ol 12:00    04:00  < LLD      < LLD      < LLD  1. 36E-02  6.29E-Ol 12: 15  04:15  < LLD      < LLD      < LLD  1.33E-02  6.12E-Ol 12:30    04:30  < LLD      < LLD      < LLD  1. JOE-02  5.96E-Ol 12:45    04:45  < LLD      < LLD      < LLD  1.27E-02  5.SlE-01 13:00    05:00  < LLD      < LLD      < LLD  1.24E-02  5.68E-Ol 13:15    05:15  < LLD      < LLD      <"LLD  l.22E-02  5.54E-Ol 13:30    05:30  < LLD      < LLD      < LLD  1.20E-02  5.42E-Ol 20:15    12:15  < LLD      < LLD      < LLD  8.35E-03  3.35E-Ol 20:30    12:30  < LLD      < LLD    .< LLD  8.26E-03  3.30E-Ol 20:45    12:45  < LLD      < LLD  .. < LLD  8.17E-03  3.25E-Ol 21:00    13:00  < LLD      < LLD      < LLD  8.0SE-03  3.20E-Ol 21:15    13:15  < LLD      < LLD      < LLD  7.99E-03  3.16E-Ol 21:30    13: 30  < LLD      < LLD      < LLD  7.91E-03  3.llE-01 21:45    13:45  < LLD      < LLD      < LLD  7.82E-03  3.07E-Ol 22:00    14:00  < LLD      < LLD      < LLD  7.74E-03  3.0JE-01 9.1.14
 
Containment Atmosphere Concentrations Salem Nuclear Generating Station 06/23/93 Total Clock    Drill  I-131
* I-132      I-133      I-134    I-135    Iodine
  ':!:'ime ~ime  uCi/cc      uci/cc    uci/cc      uCi/cc    uCi/cc    uci/cc 08:00    00:00 1. 78E-10    2.71E-11 l.19E-10    2.82E-ll 6.05E-ll 4.13E-10 08:15    00:15 1. 78E-10    2.70E-ll 1.19E-10    2.82E-ll 6.04E-ll 4.13E-10 08:30    00:30 1. 78E-10. 2.70E-11    l.19E-10    2.81E-11 6.04E-11 4.12E-10 08:45    00:45 l.78E-10 2.70E-ll l.19E-10        2.81E-li 6.03E-ll 4.12E-10 09:00  01:00 1. 78E-10    2.70E-11 l.19E-10    2.81E-11 6.03E-11 4.12E-10 09:15  01:15 1. 78E-10    2.69E-11 l.18E-10    2.SlE-11 6*02E-ll 4.llE-10 09:20  01:20 l.78E-10 2.69E-11 l.lSE-10      . 2.SlE-11 .6.02E-ll 4.llE-10 09:25  01:25 1.78E-10 2.69E-11 1. lSE-10        2.SOE-11 6.02E-ll 4.llE-10 09:30    01:30 1.77E-10 2~69E-11 1.18E-10.        2.80E-11 6.02E-11 4.llE-10 09:45  01:45 1.77E-10 2.69E-11 1. lSE-10        2.80E-11 6.0lE-11 4.llE-10 10:00    02:00 l.77E-10 2.69E-ll 1. lSE-10        2.SOE-11 6.0lE-11 4.lOE-10 10:15    02:15 1. 77E-10 2.68E-11 1.18E-10        2.80E-ll 6.00E-11 4.lOE-10 10:30    02:30 2.65E-08 4.02E-09 l.77E-08        4.19E-09 8.99E-09 6.14E-08 10:45    02:45 2.65E-07 J.72E-08 1. 75E!.07      J.43E-08 8.75E-08 5.99E-07 11:00  03:00 2.64E-07 J.44E-08 1. 74E-07        2.80E-08 8.52E-08 5.85E-07 11:15    03:15 2.64E-07 J.19E-08 l.72E-07        2.29E-08 8.30E-08 5.73E-07 11:30  03:30 2.63E-07 2.95E-08 1. 70E-07        1. 87E-08 8.08E-08 5.63E-07 11:45  03:45 2.63E-07 2.73E-08 1. 69E-07        1. 53E-08 7.86E-08 .5.53E-07 12:00    04:00 2.62E-07 2.52E-08. 1. 67E-07      1. 25E-08 7.65E-08 5.44E-07 12:15  04:15 2 *. 62E-07 2.33E-08 1. 66E-07    1. 02E-08 7.45E-08 5~36E-07 12:30    04:30 2.61E-07 2.16E-08 1.64E-07        8.36E-09 7.25E-08 5.28E-07 12:45    04:45 2.61E-07 2.00E-08 1.62E-07        6.83E-09 7.06E-08 5 .. 21E-07 13:00    05:00 2.60E-07 1. 85E-08 1. 61E-07      5.59E-09 6.87E-08 5.14E-07 13:15    05:15 2.60E-07 1. 71E-08 l.59E-07        4.57E-09 6.69E-08 5.0SE-07 13:30    05:30 2.60E-07 l.58E-08 1.SSE-07        3.73E-09 6.SlE-08 5.02E-07 20:15    12:15 2.47E-07 . l.94E-09 l.22E-07*      l.62E-ll 3.lSE-08 4.0JE-07 20:30    12:30 2.47E-07 1. SOE-09 1. 21E-07      l.33E-ll 3.07E-08 4.0lE-07 20:45    12:45 2.46E-07 1.66E-09 1. 20E-07        1. OSE-11 2.99E-08 3.98E-07 21:00    13:00 2.46E-07 1.54E-09 1.19E-07        8.86E-12 2.91E-08 3.96E-07 21:15    13:15 2.46E-07 1. 42E-09 1. lSE-07      .7. 24E-12 2.83E-08 3. 93E-07 21:30    13:30 2.45E-07 1. 32E-09 1.17E-07        5.92E-12 2.76E-08 3.91E-07 21:45    13:45 2.45E-07 l.22E-09
* l.16E-07      4.84E-12 2.68E-08 3.SSE-07 22:00    14:00 2.44E-07 l.13E-09 l.15E-07        3.96E-12 2.61E-08 3.86E-07
* 9.1.15
 
Containment Atmosphere Concentrations Salem Nuclear Generating Station 06/23/93 Clock  Drill  DEI          Kr-85    Kr-87    Kr-88      Xe-131m Xe-133 Time  Time    uCi/cc        uCi/cc    uCi/cc    uCi/cc    uCi/cc  uci/cc 08:00  00:00  2.04E-10        < LLD    < LLD    < LLD      < LLD  < LLD 08:15  00:15  2.04E-10        < LLD    < LLD    < LLD      < LLD  < LLD 08:30  00:30  2.04E-10        < LLD    <  LLD    <  LLD    < LLD  < LLD 08:45  00:45  2.04E-10        < LLD    <  LLD    <  LLD    < LLD  < LLD 09:00  01:00  2.04E-10        < LLD    <  LLD    <  LLD    < LLD  < LLD 09:15  01:15  2.03E-10        < LLD    <  LLD    < LLD    < LLD  < LLD 09:20  01:20  2.03E-10        < LLD    <  LLD    <  LLD    < LLD  < LLD 09:25  01:25  2 ** 03E-10      < LLD    <  LLD    < LLD    < LLD  < LLD 09:30  01:30  2.03E-10        < LLD    <  LLD    < LLD    < LLD  < LLD 09:45  01:45  2.03E-10        < LLD    <  LLD.    < LLD    < LLD  < LLD 10:00  02:00  2.03E-10        < LLD    <  LLD    < LLD    < LLD  < LLD 10:15  02:15  2.03E-10        < LLD    <  LLD    < LLD    < LLD  < LLD 10:30  02:30  3.04E-08        < LLD    <  LLD    < LLD    < LLD  < LLD 10:45  02:45  3.02E-07        < LLD  6.97E-07    < LLD    < LLD  < LLD 11:00  03:00  J.OOE-07        < LLD  6.08E.!07    < LLD    < LLD  .<LLD l.1:15 03:15  2.98E-07        < LLD    < LLD      < LLD    < LLD  < LLD 11:30  03:30  2.96E-07        < LLD    < LLD      < LLD    < LLD  < LLD 11:45  03:45  2.95E-07        < LLD    < LLD    < LLD    < LLD  < LLD 12:00  04:00  2.93E-07        < LLD    < LLD    < LLD    < LLD  < LLD 12:15  04:15  2.92E-07        < LLD    < LLD    < LLD    < LLD  < LLD 12:30  04:30  2. 91E.;..07    < LLD    < LLD    < LLD    < LLD  < LLD 12:45  04:45- 2.90E-07        < LLD    < LLD    < LLD    < LLD  < LLD 13:00  05:00  2.SSE-07        < LLD    < LLD    < LLD    < LLD  < LLD 13:15 13:30 20:15 20:30 20:45 21:00 21:15 05:15 05:30 12:15 12:30 12:45 13:00 13:15 2.87E-07 2.86E-07 2.64E-07 2.64E-07 2.63E-07 2.62E-07 2.62E-07
                              < LLD
                              < LLD
                              < LLD
                              < LLD
                              < LLD
                              < LLD
                              < LLD
                                        < LLD
                                        < LLD
                                        < LLD
                                        < LLD
                                        < LLD
                                        < LLD
                                        < LLD
                                                  < LLD
                                                  < LLD
                                                  .<LLD
                                                  < LLD
                                                  < LLD
                                                  < LLD
                                                  < LLD LLD LLD LLD LLD LLD LLD LLD
                                                                    < LLD
                                                                    < LLD
                                                                    < LLD
                                                                    < LLD
                                                                    < LLD
                                                                    < LLD
                                                                    < LLD 21:30  13:30  2 *. 61E-07      < LLD    < LLD    <LLD.    < LLD  < LLD 21:45  13:45  2.60E-07        < LLD    < LLD    < LLD    <  LLD  < LLD 22:00  14:00  2.60E-07        < LLD    < LLD    < LLD    <  LLD  < LLD 9.1.16
 
Containment Atmosphere Concentrations Salem Nuclear Generating station 06/23/93 Total Clock Drill  Xe-133m    Xe-135    Noble Gas Rb-88    sr-89  sr-90 Time  Time  uCi/cc    uCi/cc    uci/cc    uCi/cc  uCi/cc uCi/cc 08:00 00:00    < LLD    < LLD  3.84E-09      < LLD  < LLD  < LLD 08:15 00:15    < LLD    < LLD  3.83E-09      < LLD  < LLD  < LLD 08:30 00:30    < LLD    < LLD  3.83E-09      < LLD  < LLD  < LLD 08:45 00:45    < LLD    < LLD  3.83E-09      < LLD  < LLD  < LLD 09:00 01:00    < LLD    < LLD  3.82E-09      < LLD  < LLD  < LLD 09:15 01:15    < LLD    < LLD  3.82E-09      < LLD  < LLD  < LLD 09:20 01:20    < LLD    < LLD  3.82E-09      < LLD  < LLD  < LLD 09:25 01:25    < LLD    < LLD  3.82E-09      < LLD  < LLD  < LLD 09:30 01:30    < LLD    < LLD  3.82E-09      < LLD  < LLD  < LLD 09:45 01:45    < LLD    < LLD  3.BlE-09      < LLD  < LLD  < LLD 10:00 02:00    < LLD    < LLD  3.BlE-09      < LLD  < LLD  < LLD 10:15 02:15    < LLD    < LLD  3.BlE-09      < LLD  < LLD  < LLD 10:30 02:30    < LLD    < LLD  5.70E-07    3.89E-12  < LLD  < LLD 10:45 02:45 3.BlE-07    < LLD  5. 57E:!.06 2.16E-ll  < LLD  < LLD 11:00 03:00 3.79E-07    < LLD  5.46E-06    l.21E-ll  < LLD  < LLD 11:15 03:15 3.77E-07    < LLD  5.36E-06    6.72E-12  < LLD  < LLD 11:30 03:30 3.76E-07    < LLD  S.27E-06    3.74E-12  < LLD  < LLD 11:45 03:45 3.74E-07    < LLD  5.19E-06    2.0BE-12  < LLD  < LLD 12:00 04:00 3.73E-07    < LLD  5.llE-06    l.16E-12  < LLD  < LLD 12:15 04:15 3.71E-07    < LLD  5.05E-06    6.47E-13  < LLD  < LLD 12:30 04:30 3.70E-07    < LLD  4.99E-06    3.60E-13  < LLD  < LLD 12:45 04:45 3.68E-07    < LLD  4.93E-06    2.0lE-13  < LLD  < LLD 13:00 05:00 3.67E-07    < LLD  4.88E-06    l.12E-13  < LLD  < LLD 13:15 05:15 3.65E-07    < LLD  4.84E-06      < LLD  < LLD  < LLD 13:30 05:30 3.64E-07    < LLD  4.SOE-06      < LLD  < LLD  < LLD 20:15 12:15 3.26E-07    < LLD  4.24E-06      < LLD  < LLD  < LLD 20:30 12:30 3.24E-07    < LLD  4.23E-06      < LLD  < LLD  < LLD 20:45 12:45 3.23E-07    < LLD  4.21E-06      < LLD  < LLD  < LLD 21:00 13:00 3.22E-07    < LLD  4.20E-06      < LLD  < LLD  < LLD 21:15 13:15 3.20E-07    < LLD  4.19E-06      < LLD  < LLD  < LLD 21:30 13:30 3.19E-07    < LLD  4.lSE-06      < LLD  < LLD  < LLD 21:45 13:45 3.lSE-07    < LLD  4.17E-06      < LLD  < LLD  < LLD 22:00 14:00 3.17E-07    < LLD  4.lSE-06      < LLD  < LLD  < LLD
* 9.1.17
 
Containment Atmosphere Concentrations Salem Nuclear Generating Station 06/23/93
:lock  Drill  :'lo-99      Te-129    Te-132      Cs-134    Cs-137  Ba-140 Time    Time    uci/cc      uCi/cc    uCi/cc      uci/cc    uCi/cc  uci/cc
*)8:00  00:00  2.25E-14    3.68E-14  J.75E-13    l.34E-13    < LLD    < LLD
'.)8:15 00:15  2.24E-14    S.68E-14  J.74E-13    1. 34E-13    < LLD    < LLD 08:30  00:30  2.24E-14    8.67E-14  J.74E-13    l.34E-13    < LLD    < LLD 08:45  00:45  2.24E-14    8.66E-14  3.73E-13    l.34E-13    < LLD    < LLD 09:00  01:00  2.24E-14    8.65E-14  3.73E-13    1. 34E-13    < LLD    < LLD 09:15  01:15  2.24E-14    8.64E-14  J.73E-13    1. 34E-13    < LLD    < LLD 09:20  01:20  2.23E-14    8.64E-14  3.73E-13    1. 34E-13    < LLD    < LLD 09:25  01:25  2.23E-14    8.64E-14  3.73E-13    1. 34E-13    < LLD    < LLD 09:30  01:30  2.23E-14    8.64E-14  3.72E-13    1. 34E-13    < LLD    < LLD 09:45  01:45  2.23E-14    8.63E-14  3.72E-13    l.33E-13    < LLD    < LLD 10:00  02:00  2.23E-14    8.62E-14  3.72E-13    1. 33E-13    < LLD    < LLD 10:15  02:15  2.23E-14    8.61E-14  3.71E-13    1. 33E-13    < LLD    < LLD 10:30  02:30  3.34E-12    1. 29E-11 5.57E-ll    2.00E-11 7.75E-14    < LLD 10:45  02:45  3.33E-ll    l.llE-10  5.55E-10    1.99E-10
* 7.74E-13  < LLD 11:00  03:00  3.31E-ll    9.52E-ll  5. 53E.i:.10 1.99E-10 7.73E-13    < LLD
:..1:15 03:15 *J.30E-ll    3.17E-ll  5.51E-10    1.99E-10 7.72E-13    < LLD 11:30  03:30  J.29E-ll    7.02E-ll  5.50E-10    l.99E-10 7.72E-13    < LLD 11:45  03:45  3.28E-ll    6.03E-ll  5.48E-10    l.99E-10 7.71E-13    < LLD 12:00  04:00  3.27E-11    5.lSE-11  5.46E-10    l.98E-10 7.70E-13    < LLD 12:15  04:15  3.26E-ll    4.44E-ll  5.44E-10    l.98E-10 7.70E-13    < LLD 12:30  04:30  3.25E-ll    3.82E-ll  5.43E-10    l.98E-10 7.69E-13    < LLD 12:45  04:45  3.23E-ll    3.28E-11  5.41E-10    l.98E-10 7.68E-13    < LLD*.
13:00  05:00  3.22E-11    2.SlE-11  5.39E-10    l.98E-10 7.68E-13    < LLD 13:15  05:15  3.21E-ll    2.42E-11  5.38E-10    l.98E-10 7.67E-13    < LLD 13:30  05:30  3.20E-ll    2.0SE-11  5.36E-10    1. 97E-10  7.66E-13  < LLD 20:15  12:15  2.91E-ll    3.40E-13  4.93E-10    1. 93E-10  7.48E-13  < LLD 20:30  12:30  2.90E-ll    2.92E-13  4.91E-10    l.92E-10 7.47E-13    < LLD 20:45  12:45  2.89E-ll    2.51E-13  4.90E-10    1.92E-10 7.46E-13    < LLD 21:00  13:00  2.SSE-11    2.15E-13  4.SSE-10    l.92E-10 7.46E-13    < LLD 21:15  13:15  2.87E-11    1. 85E-13 4. 86E'.""10 1.92E-10 7.45E-13    < LLD 21:30  13:30  2.86E-ll    1. 59E-13 4.85E-10    l.92E-10 7. 44E-13    < LLD 21:45  13:45  2.85E-ll    1. 36E-13 4.SJE-10    l.92E-10 7.44E".""13  < LLD 22:00  14:00  2.84E-ll    l.17E-13  4.82E-10    1. 91E-10  7.43E-13  < LLD 9.1.18
 
Containment Atmosphere Concentrations Salem Nuclear Generating Station 06/23/93 Total    Gross Clock Drill      La-140    La-142      Ce-144  Particulate Activity
  'T' *
  ... ime '::' ime uci/cc    'J.Ci/cc    uCi/cc    uCi/cc    uCi/cc 08:00 00:00        < LLD      < LLD      < LLD    6.45E-13  4.25E-09 08:15 00:15        < LLD      < LLD      < LLD    6.44E-13  4.25E-09 08:30 00:30        < LLD      < LLD      < LLD    6.44E-13  4.24E-09 08:45 00:45        < LLD      < LLD      < LLD    6.43E-13  4.24E-09 09:00 01:00        < LLD      < LLD      < LLD    6.42E-13  4.24E-09 09:15 01:15        < LLD      < LLD      < LLD    6.42E-13  4.23E-09 09:20 01:20        < LLD      < LLD      < LLD. 6.42E-13  4.23E-09 09:25 01:25        < LLD      < LLD      < LLD    6.41E-13  4.23E-09 09:30 01:30        < LLD      < LLD      < LLD    6.41E-13  4.23E-09 09:45 01:45        < LLD      < LLD      < LLD    6.41E-13  4.22E-09 10:00 02:00        < LLD      < LLD      < LLD    6.40E-13  4.22E-09 10:15 02:15        < LLD      < LLD      < LLD    6.39E-13  4.22E-09 10:30 02:30        < LLD      < LLD      < LLD    9.58E-11  6.32E-07 10:45 02:45        < LLD      < LLD      < LLD    9.21E-10  6.17E-06 11:00 03:00        < LLD      < LLD      < LLD    8.94E-10  6.05E-06 11:15 03:15        < LLD      < LLD      < LLD    8.73E-10  5.93E-06 11:30 03:30        < LLD      < LLD      < LLD    8.56E-10  5.83E-06 11:45 03:45        < LLD      < LLD      < LLD    8.43E-10  5.74E-06 12:00 04:00        < LLD      < LLD      < LLD    8.31E-10  5.66E-06 12:15 04:15        < LLD      < LLD      < LLD    8.21E-10  5.58E-06 12:30 04:30        < LLD      < LLD      < LLD    8.13E-10  5.51E-06 12:45 04:45        < LLD      < LLD      < LLD    8.05E-10  5.45E-06 13:00 05:00        < LLD      < LLD      < LLD    7.98E-10  5.40E-06 13: 15 05:15      < LLD      < LLD      < LLD    7.92E-10  5.35E-06 13:30 05:30        < LLD      < LLD      < LLD    7.87E-10  5.30E-06 20:15 12:15        < LLD      < LLD      < LLD    7.15E-10  4.64E-06 20:30 12: 30      < LLD      < LLD      < LLD    7.14E-10  4.63E-06 20:45 12:45        < LLD      < LLD      < LLD    7.12E-10  4.61E-06 21:00 13:00        < LLD      < LLD      < LLD    7.lOE-10  4. 60E-06.
21:15 13:15        < LLD      < LLD      < LLD    7.0SE-10  4.58E-o6*
21:30 13:30        < LLD*    < LLD      < LLD    1.06E-10  4.57E-06 21:45 13:45        < LLD      < LLD      < LLD    7.04E-10  4.55E-06 22:00 14:00        < LLD      < LLD      < LLD    7.03E-10  4.54E-06
* 9.1.19
 
Aux Building Atmosphere Concentrai:ions Salem Nuclear Generai:ing station 06/23/93 Total Clock    Drill      I-131      I-132      I-133    I-134      I-135      Iodine
":'ime  ":'i..me  uCi/cc    uCi/cc    uci/cc    uCi/cc    uci/cc      uci/cc 08:00    OO:OO        < LLD    < LLD      < LLD      < LLD  l.42E-15 9.71E-15 08:15    00:15        < LLD    < LLD      < LLD      < LLD  1. 42E-15  9.70E-15 08:30    00:30        < LLD    < LLD      < LLD      < LLD  1. 42E-15  9.70E-15 08:45    00:45        < LLD    < LLD      < LLD      < LLD  2..42E-15 9.69E-15 09:00    01:00        < LLD    < LLD      < LLD      < LLD  1. 42E-15  9.68E-15 09:15    01:15        < LLD    < LLD      < LLD      < LLD  l.42E-15 9.67E-15 0.9: 20  01:20        < LLD    < LLD      <  LLD    < LLD  1. 42E-15  9.67E-15 09:25    01:25        < LLD    < LLD      <  LLD    < LLD  1. 41E-15  9.66E-15 09:30    01:30        < LLD    < LLD      <  LLD    < LLD  1. 41E-15  9.66E-15 09:45    01:45        < LLD    < LLD      <  LLD    < LLD* 1. 41E-15  9.65E-15 10:00    02: 00      < LLD    < LLD      <  LLD    < LLD  1. 41E-15  9.64E-15 10:15    02:15        < LLD    < LLD      <  LLD    < LLD  1. 41E-15  9.63E-15 10:30    02:30    6.23E-13    9.46E-14  4 .16,E-13    < LLD  2.llE-13 1. 44E-12 10:45    02:45    6.22E-12    8.75E-13  4.12E-12  8 .'05E-13 2.06E-12 l.41E-11
:.1:00  03:00    *S. 21E-12  3.09E-13  4.08E-12  6.58E-13  2.00E-12 1.38E-11 11:15    03:15    6.20E-12    7.49E-13  4.04E-12  5.38E-13  l.95E-12 1. 35E-11 11:30    03:30    6.19E-12    6.93E-13  4.00E-12  4.40E-13  l.90E-12 1. 32E-11 11:45    03:45    6.lSE-12    6.41E-13  3.97E-12      < LLD  1. 85E-12  1. 30E-11 12 :*oo  04:00    6.17E-12    5.93E-13  3.93E-12      < LLD  1. SOE-12  l.28E-11 12:15    04:15    6.03E-12    5.38E-13  3.SlE-12      < LLD  1. 72E-12  l.23E-11 12:30    04:30    6.02E-12    4.98E-13  3.78E-12      < LLD  1. 67E-12 1.22E-ll 12:45    04:45    6.13E-12    4.70E-13  3.82E-12      < LLD  1.66E-12 1.22E-ll 13:00    05:00    6.12E-12    4.35E-13  3.78E-12      < LLD  1.62E-12 1.21E-11.
13:15    05:15    6.llE-12    4.02E-13  3.75E-12      < LLD  1.57E-12 1.19E-11 13:30    05:30    6.lOE-12    3.72E-13  3.71E-12      < LLD  1. 53E-12 1.lSE-11 20:15  *12:15    5.SlE-12      < LLD    2.SSE-12      < LLD  7.41E-13 9.48E-12 20:30    12:30    5.SOE-12      < LLD    2.SSE-12      < LLD  7. 21E-13
* 9.42E-12 20:45    12:45    5.79E-12      < LLD .. 2.82E-12      < LLD  7.02E-13 9.36E-12 21:00    13:00    5.78E-12      <LLD    2.SOE-12      < LLD  6.84E-13 9.JOE-12 21:15    13:15    5.77E-12      < LLD    2.77E-12      < LLD  6.66E-13 9.24E-12 21:30    13:30    5.76E-12      < LLD    2.74E-12      < LLD  6.48E-13 9.lSE-12 21:45    13:45    5.75E-12      < LLD    2.72E-12      < LLD  6.31E-13 9.13E-12 22:00    14:00    5.74E-12      < LLD    2.69E-12      < LLD  6.14E-13 9.07E-12 9.1.ZD
* Clock Time 08:00 Drill
        ~.i.me 00:00 DEI uCi/cc Aux Building Atmosphere Concentrat:.ions J:.BOE-15 Salem Nuclear Generating Station Kr-85 uci/cc
                              < LLD 06/23/93 Kr-87 uci/cc
                                      <  LLD Kr-88 uci/cc
                                                < LLD Xe-13lm uCi/cc
                                                            <  LLD*
Xe-133 uCi/cc
                                                                      < LLD 08:15  00:15  ~.80E-15      < LLD    <  LLD  < LLD      <  LLD    < LLD 08:30  00:30  4.79E-15    <  LLD    <  LLD  < LLD      <  LLD    < LLD 08:45  00:45  4.79E-15    <  LLD    <  LLD  < LLD      <  LLD    < LLD 09:00  01:00  4.78E-15    <  LLD    <  LLD  < LLD      <  LLD    < LLD 09:15  01:15  4.78E-15    <  LLD    <  LLD  < LLD      <  LLD    < LLD 09:20  01:20  4.78E-15    <  LLD    <  LLD  < LLD      <  LLD    < LLD 09:25  01:25  4.78E-15    <  LLD    <  LLD  < LLD      <  LLD    < LLD 09:30  01:30  4.78E-15    <  LLD    <  LLD  < LLD      <  LLD    < LLD 09:45  01:45  4.77E-15      < LLD    <  LLD  < LLD      <  LLD    < LLD 10:00  02:00  4.77E-15    <  LLD    <  LLD  < LLD      <  LLD    < LLD 10:15  02:15  4.76E-15      < LLD    <  LLD  < LLD      <  LLD    < LLD 10:30  02:30  7.14E-13      < LLD    <  LLD  < LLD      <  LLD    < LLD 10:45  02:45  7.09E-12      < LLD    <; .;LLD  < LLD      <  LLD  * < LLD 11:00  03:00  7.04E-12      < LLD    < LLD    < LLD      <  LLD    < LLD l.1:15 03:15  7.00E-12    <  LLD    < LLD    < LLD      <  LLD    < LLD 11:30  03:30  6.96E-12      < LLD    < LLD    < LLD      <  LLD    < LLD 11:45  03:45  6.93E-12    <  LLD    <  LLD  < LLD      <  LLD    < LLD 12:00  04:00  6.89E-12      < LLD    <  LLD  < LLD      <  LLD    < LLD 12:15  04:15  6.73E-12      < LLD    <  LLD  < LLD      <  LLD    < LLD 12:30  04:30  6.70E-12      < LLD    <  LLD  < LLD      <  LLD    < LLD 12:45  04:45  6.SlE-12    <  LLD    <  LLD  < LLD      <  LLD    < LLD 13:00  05:00  6.78E-12    <  LLD    <  LLD  < LLD      <  LLD    < LLD 13:15  05:15  6.75E-12      < LLD    <  LLD  < LLD      <  LLD    < LLD 13:30  05:30  6.73E-12      < LLD    <  LLD  < LLD      <  LLD    < LLD 20:15  12:15  6.22E-12      < LLD    <  LLD  < LLD      <  LLD    < LLD 20:30  12:30  6.20E-12      < LLD    <  LLD  < LLD      <  LLD    < LLD 20:45  12:45" 6.lSE-12    <  LLD    <  LLD  < LLD      <  LLD    < LLD 21:00  13:00  6.17E-12      < LLD    <  LLD  < LLD      <  LLD    < LLD 21:15  13:15  6.lSE-12      < LLD    <  LLD  < LLD      <  LLD    < LLD 21:30  13:30  6.14E-12      < LLD    <  LLD  < LLD      <  LLD    < LLD 21:45  13:45  6.12E-12      < LLD    <  LLD  < LLD      <  LLD    < LLD 22:00  14:00  6.llE-12      < LLD    <    LLD  < LLD      <  LLD    < LLD
* 9.1.21
 
Aux Building Atmosphere  Concen~ra~ions Salem Nuclear Generating Station 06/23/93 Total Clock Drill    Xe-133m    xe-135    Noble Gas Rb-88      sr-89    sr-90 Time  ~ime    uci/cc      uci/cc    uci/cc    uCi/cc    uci/cc  uci/cc 08:00  00:00    < LLD        < LLD  9.02E-14    < LLD    <  LLD  < LLD 08:15  00:15    <  LLD      < LLD  9.0lE-14    < LLD    <  LLD  <  LLD 08: 30 00:30    <  LLD      <  LLD  9.00E-14    < LLD    <  LLD  <  LLD 08:45  00:45    <  LLD      <  LLD  3.99E-14    < LLD    <  LLD  <  LLD 09:00  01:00    <  LLD      <  LLD  8.99E-14    < LLD    <  LLD  <  LLD 09:15  01:15    < LLD        <  LLD  8.98E-14    < LLD    <  LLD  <  LLD 09:20  01:20    <  LLD      <  LLD  8.98E-14    < LLD    <  LLD  <  LLD 09:25  01:25    <  LLD      <  LLD  8.98E-14    < LLD    <  LLD  <  LLD 09:30  01:30    <  LLD      <  LLD  3.98E-14    < LLD      <  LLD  <  LLD 09:45  01:45    <  LLD      <  LLD  8.98E-14    < LLD      <  LLD  <  LLD 10:00  02:00    <  LLD      < LLD  8.98E-14    < LLD      <  LLD  <  LLD 10:15  02:15    <  LLD      < LLD  8.98E-14    < LLD      <  LLD  <  LLD 10:30  02:30    <  LLD      < LLD  8.9SE-14    < LLD      <  LLD  <  LLD 10:45  02:45    <  LLD      <  LLD  8.98E-14    < LLD      <  LLD  <  LLD 11:00  03:00    <  LLD      <  LLD  a.98E-14      < LLD    <  LLD  <  LLD 11:15  03:15    <  LLD      <  LLD  1. 26E-10    < LLD    <  LLD  <  LLD 11:30  03:30    <  LLD      <  LLD  l.24E-10      < LLD    <  LLD  <  LLD 11:45  03:45    <  LLD      <  LLD  l.22E-10      < LLD    <  LLD  < LLD 12:00  04:00    <  LLD      <  LLD  1. 20E-10    < LLD    <  LLD  < LLD 12: 15 04:15    <  LLD      <  LLD  l.16E-10      < LLD    <  LLD  < LLD 12:30  04:30    <  LLD      <  LLD  1.lSE-10      < LLD    < LLD    < LLD 12:45  04:45    <  LLD      <  LLD  l.16E-l.O    < LLD    < LLD    < LLD 13:00  05:00    <  LLD      <  LLD  l.1SE-10      < LLD    < LLD    < LLD 13: 15 05:15    <  LLD      <  LLD  l.l.4E-10    < LLD    < LLD    <  LLD 13 :30 ,05: 30  <  LLD      <  LLD  l.1JE-l.O    < LLD    < LLD    <  LLD 20:15  12:15    <  LLD      <  LLD  9.97E-11      < LLD    < LLD    <  LLD 20:30  12:30    <  LLD      <  LLD 9.94E-ll      < LLD    <LLD.    <  LLD 20:45  12:45    <  LLD      <  LLD 9.91E-11      < LLD    < LLD    <  LLD 21:00  13:00    <  LLD      <  LLD  9.SSE-11    < LLD    < LLD    <  LLD 21:15  13:15    <  LLD      <  LLD  9.85E-11    < LLD    < LLD    <  LLD 21:30  13 :30  <  LLD      <  LLD  9.82E-11*    < LLD    < LLD    < LLD 21:45  13:45    <  LLD      <  LLD  9.79E-11    < LLD      < LLD  < LLD 22:00  14:00    <  LLD      < LLD  9.76E-11    < LLD      < LLD  < LLD 9.1.22
* Clock Time 08:00 Drill Time 00:00 Mo.-99 uCi/cc
                <  LLD Aux Building Atmosphere Concen~rations Salem Nuclear Generating Station Te-129 uCi/cc
                            < LLD 06/23/93 Te-132 uCi/cc
                                        <  LLD Cs-134 uCi/cc
                                                  < LLD Cs-137 uCi/cc
                                                            < LLD Ba-140 uci/cc
                                                                  < LLD 08:15  00:15  <  LLD      < LLD      < LLD    < LLD    < LLD  < LLD 08:30  00:30  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 08:45  00:45  <  LLD      < LLD    *< LLD    < LLD    < LLD  < LLD 09:00  Ol:OO  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 09:15  01:15  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 09:20  01:20  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 09:25  01:25  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 09:30  01:30  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 09:45  01:45  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 10:00  02:00  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 10:15  02:15  <  LLD      < LLD      <  LLD  < LLD.    < LLD  < LLD 10:30  02:30  <  LLD      < LLD      <  LLD  < LLD.    < LLD  < LLD 10:45  02:45  <  LLD      < LLD      <.~LD    < LLD    < LLD  < LLD 11:00  03:00  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD
:..1:15 03:15  <  LLD      < LLD      <  LLD.  < LLD    < LLD  < LLD 11:30  03:30 <<  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 11:45  03:45  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 12:00  04:00  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 12:15  04:15  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 12:30  04:30  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 12:45  04:45  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 13:00  05:00  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 13:15  05:15  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 13:30  05:30  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 20:15  12:15  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 20:30  12:30  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 20:45  12:45  <  LLD      < LLD      <  LLD  < LLD    < LLD  < LLD 21:00  13:00  < LLD      < LLD      < LLD    < LLD    < LLD  < LLD 21:15  13:15  < LLD      < LLD      < LLD    < LLD    < LLD  < LLD 21:30  13:30  < LLD      < LLD      < LLD    < LLD    < LLD  < LLD 21:45  13:45  < LLD      < LLD      < LLD    < LLD    < LLD  < LLD 22:00  14:00  < LLD      < LLD      < LLD    < LLD    < LLD  < LLD 9.1.23
 
Aux Building Atmosphere Concem:rations Salem Nuclear Genera~ing Station 06/23/93 Total    Gross Clock    Drill  La-140    La-142        ce-144    Particulate  Activity Time,    ':'ime  uCi/cc    uCi/cc        '..lCi/cc    uCi/cc    uCi/cc 08:00    00:00    < LLD      < LLD        < LLD    ::..52E-17  9.99E-14 08:15    00:15    < LLD      < LLD        < LLD    l . 51E-l 7 9.98E-14 08:30    00:30    < LLD      < LLD        < LLD    1. 51E-17  9.97E-14 08:45    00: 4*5  < LLD      < LLD        < LLD    l . 51E-l 7 9.96E-14 09:00    01:00    < LLD      < LLD        < LLD    l . 51E-17  9.95E-14 09:15    01:15    < LLD      < LLD        < LLD    l . 51E-l 7 9.95E-14 09:20    01:20  < LLD      < LLD        < LLD    1. 51E-l 7  9.95E-14 09:25    01:25  < LLD      < LLD          < LLD    1. 51E-l 7  9.95E-14 09:30    01:30  < LLD      < LLD          < LLD    1. 51E-l 7  9.95E-14 09:45    01:45  < LLD      < LLD          < LLD    1.51E-17    9.95E-14 10:00    02:00  < LLD      < LLD          < LLD    1. SOE-17  9.95E-14 10:15    02:15  < LLD      < LLD          < LLD    1. SOE-17  9.95E-14 10:30    02:30  < LLD      < LLD          <;..LLD  .2. 25E-15  l.53E-12 10:45    02:45  < LLD      < LLD          <  LLD  2.16E-14  l.45E-10
:;_1: 00  03:00  < LLD      < LLD          <  LLD  2.lOE-14  l.42E-10 11:15    03:15  < LLD      < LLD          <  LLD  2.05E-14  l.39E-10 11: 30    03:30  < LLD      < LLD          <  LLD  2.0lE-14  l.37E-10 11:45    03:45  < LLD      < LLD          <  LLD  l.98E-14  1. 35E-10 12:00    04:00  < LLD      < LLD          <  LLD  1. 9.SE-14 1. 33E-10 12:15    04: 15  < LLD      < LLD.        <  LLD  l.89E-14  l.29E-10 12:30    04:30  < LLD      < LLD          <  LLD  l.87E-14  l.27E-10 12:45    04:45  < LLD      < LLD          <  LLD  1.89E-14  l.28E-10 13:00    05:00  < LLD      < LLD          <  LLD  1. SSE-14  l.27E-10 13:15    05:15  < LLD      < LLD          <  LLD  1. 86E-14  1. 26E-10 13:30    05:30  < LLD      < LLD          <  LLD  1.SSE-14  l.25E-10 20:15    12:15    < LLD      < LLD        <  LLD  l.68E-14  1. 09E-10 20:30    12:30    < LLD      < LLD        <  LLD  l.68E-14  1. 09E-10 20:45    12:45    < LLD      < LLD --      <  LLD  l.67E-14  l.OSE-10 21:00    13:00    < LLD      < LLD        <  LLD  l.67E-14  1. OSE-10 21:15    13:15    < LLD      < LLD        <  LLD  l.66E-14  1. OSE-10 21:30    13:30    < LLD      < LLD        <  LLD  1.66E-14    1.07E-10 21:45    13:45    < LLD      < LLD        <  LLD  1.66E-14    1. 07E-10 22:00    14:00    < LLD      < LLD        <  LLD  l.65E-14    1. 07E-10 9.l.24
 
Auxiliary Building Atmos~here sa~ples Salem Nuclear Generating Station 06/23/93 LOW VOL    LOW VOL    LOW VOL  LOW VOL    LOW VOL Clock Drill PARTIC. CARTRIDG CARTRIDG  CARTRIDG  JBOMB-NG Time  Time  NCPM @C  mR/hr @c mR/hr @1'  NCPM @C  mR/hr @C 08:00 00:00 < 100      < 0.2      < 0.2    < 100      < 0.2 08:15 00:15 < 100      < 0.2      < 0.2    < 100      < 0.2 08:30 00:30 < 100      < 0.2      < 0.2    < 100      < 0.2 08:45 00:45 < 100      < 0.2      < 0.2    < 100      < 0.2 09:00 01:00 < 100      < 0.2      < 0.2    < 100      < 0.2 09:15 01:15 < 100      < 0.2      < 0.2    < 100      < 0.2 09:20 01:20 < 100      < 0.2      < 0.2    < 100      < 0.2 09:25 01:25 < 100      < 0.2      < 0.2    < 100      < 0.2 09:30 01:30 < 100      < 0.2      < 0.2    < 100      < 0.2 09:45 01:45 < 100      < 0.2      < 0.2    < 100      < 0.2 10:00 02:00 < 100      < 0.2      < 0.2    < 100      < 0.2 10:15 02:15 < 100      < 0.2      < 0.2    < 100      < 0.2 10:30 02:30 < 100      < 0.2      < 0.2    < 100      < 0.2 10:45 02:45 < 100      < 0.2      < d."2  < 100      < 0.2 11:00 03:00 < 100      < 0.2      < 0.2    < 100      < 0.2 11:15 03:15 < 100      < 0.2      < 0.2    < 100      < 0.2 11:30 03:30 < 100      < 0.2      < 0.2    < 100      < 0.2 11:45 03:45 < 100      < 0.2      < 0.2    < 100      < 0.2 12:00 04:00 < 100      < 0.2      < 0.2    < 100      < 0.2 12:15 04:15 < 100      < 0.2      < 0.2    < 100      < 0.2 12:30 04:30 < 100      < 0.2      < 0.2    < 100      < 0.2 12:45 04:45 < 100      < 0.2      < 0.2    < 100      < 0.2
* 13:00 05:00 < 100      < 0.2      < 0.2    < 100      < 0.2 13:15 05:15 < 100      < 0.2      < 0.2    < 100      < 0.2 13:30 05:30 < 100      < 0.2      < 0.2    < 100      < 0.2 20:15 12:15 < 100      < 0.2      < 0.2    < 100      < 0.2 20:30 12:30 < 100      < 0.2      < 0.2    < 100      < 0.2
  .20:45 12:45 < 100      < 0.2      < 0.2    < 100      < 0.2 21:00 13:00 < 100      < 0.2      < 0.2    < 100      < 0.2 21:15 13:15 < 100      < 0.2      < 0.2    < 100      < 0.2 21:30 13:30 < 100      < 0.2      < 0.2    < 100      < 0.2 21:45 13:45 < 100      < 0.2      < 0.2    < 100      < 0.2 22:00 14:00 < 100      < 0.2      < 0.2    < 100      < 0.2
* 9.1.25
 
Auxiliary Building Atmosphere Samples Salem Nuclear Generating Station 06/23/93 LOW VOL  MARNELL I  MARNELL I MARNELL I  MARNELL I MARN ELLI Clock Drill  JBOMB-NG    PARTIC. PARTIC. CARTRIDG CARTRIDG    CARTRIDG Time Time  mR/hr @1'  mR/hr @C    NCPM @C mR/hr '@c mR/hr @1'  NCPM @C 08:00 00:00    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 08:15 00:15    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 08:30 00:30    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 08:45 00:45    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 09:00 01:00    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 09:15 01:15    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 09:20 01:20    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 09:25 01:25    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 09:30 01:30    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 09:45.01:45    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 10:00 02:00    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 10:15 02:15    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 10:30 02:30    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 10:45 02:45    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 11:00 03:00    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 11:15 03:15    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 11:30 03:30    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 11:45 03:45    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 12:00 04:00    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 12:15 04:15    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 12:30 04:30    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 12:45 04:45    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 13:00 05:00    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 13:15 05:15    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 13:30 05:30    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 20:15 12:15    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 20:30 12:30    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 20:45 12:45    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 21:00 13:00    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 21:15 13:15    < 0.2      < 0.2      < 100    < 0.2      < 0.2    < 100 21:30 13:30    < 0.2      < 0.2      < 100  < 0.2      < 0.2    < 100 21:45 13:45    < 0.2      < 0.2      < 100  < 0.2      < 0.2    < 100 22:00 14:00    < 0.2      < 0.2      < 100  < 0.2      < 0.2    < 100 9.1.26
 
Auxiliary Building Atmosphere Samples Salem Nuclear Generating Station 06/23/93 MARN ELLI MARNELL I Clock    Drill      N. GAS      N. GAS Time      Time    mR/hr @C mR/hr @l' 08:00    00:00    <  0.2      <  0.2 08:15    00:15    <  0.2      <  0.2 08:30    00:30    <  0.2      <  0.2 08:45    00:45    <  0.2      <  0.2 09:00    01:00    <  0.2      <  0.2 09:15    01:15    <  0.2      <  0.2 09:20    01:20    <  0.2      <  0.2 09:25    01:25    <  0.2      <  0.2 09:30    01:30    <  0.2      <  0.2 09:45    01:45    <  0.2      <  0.2 10:00    02:00    <  0.2      <  0.2 10:15    02:15    <  0.2      <  0.2 10:30    02:30 10:45    02:45 0.2 0.2 0.2 0.2      ...
11:00    03:00    <  0.2      <  0.2 11:15    03:15    <  0.2      <  0.2 11:30    03:30    <  0.2      <  0.2 11:45    03:45    <  0.2      <  0.2 12:00    04:00    <  0.2      <  0.2 12:15    04:15    <  0.2      <  0.2 12:30    04:30    <  0.2      <  0.2 12:45    04:45    <  0.2      <  0.2 13: 00    05:00    <  0.2      <  0.2 13:15    05:15    <  0.2      <  0.2 13:30    05:30    <  0.2      <  0.2 20:15    12:15    <  0.2      <  0.2 2 o: 3 o_ 12: 3 o  <  0.2      <  0.2 20:45    12:45    <  0.2      <  0.2 21:00    13:00    <  0.2      <  0.2 21:15    13:15    <  0.2      <  0.2 21:30    13:30    <  0.2      <  0.2 21:45    13:45    <  0.2      <  0.2 22:00    14:00    <  0.2      <  0.2
* 9.1.27
 
Leak Location concentrations Salem Nuclear Generating Station 06/23/93 Total Clock  Drill      I-131      I-132      I-133    I-134    I-135      Iodine Time  "!'ime    uCi/cc    uci/cc    uCi/cc    uci/cc    uCi/cc    uci/cc 08:00  00:00      < LLD      < LLD    < LLD    < LLD      < LLD  4.86E-16 08:15  00:15      < LLD      < LLD    < LLD    < LLD      < LLD  4.85E-16 08:30  00:30      < LLD      < LLD    < LLD    < LLD      < LLD  4.85E-16 08:45  00:45      < LLD      < LLD    <  LLD  < LLD      < LLD  4.84E-16 09:00  01:00      < LLD      < LLD    < LLD    < LLD      < LLD  4.84E-16 09:15  01:15      < LLD      < LLD    < LLD    < LLD      < LLD  4.83E-16 09:20                                    <  LLD  < LLD      < LLD  4.83E~l6 01:20      < LLD      < LLD 09:25  01:25      < LLD      < LLD      < LLD    < LLD      < LLD  4.83E-16 09:30  01:30      < LLD      < LLD      < LLD    < LLD    < LLD  4.83E-16 09:45  01:45      < LLD      < LLD      <  LLD    < LLD    < LLD  4.83E-16 10:00  02:00      < LLD      < LLD      < LLD    < LLD    < LLD  4.82E-16 10:15  02:15      < LLD      < LLD      < LLD    < LLD    < LLD  4.82E-16 10:30  02:30        < LLD      < LLD      <.,LLD    < LLD  l.06E-14  7.22E-14 10:45  02:45    3.llE-13      < LLD  2.06E-13    < LLD  l.03E-13  7.04E-13 11:00  03:00    J.llE-13      < LLD  2.04E-13    < LLD  l.OOE-13  6.88E-13 11:15  03:15    3.lOE-13      < LLD  2.02E-13    < LLD  9.75E-14  6.74E-13 11:30  03:30    3.09E-13      < LLD  2.00E-13    < LLD  9.49E-14  6.61E-13 11:45  03:45    3.09E-13      < LLD  l.98E-13    < LLD  9.24E-14  6.50E-13 12:00  04:00    3.0SE-13      < LLD  1. 96E-13    < LLD  8.99E-14  6.39E-13 12:15  04:15    3.02E-13      < LLD  1. 91E-13    < LLD  8.58E-14  6.17E-13 12:30  04: 3 0. 3.0lE-13      < LLD  l.89E-13    < LLD  8.35E-14  6.0SE-13 12:45  04:45    3.07E-13      < LLD  1.91E-13 *  < LLD  8.JOE-14  6.12E-13 13:00  05:00    3. 06E-13 .    < LLD  l.89E-13    < LLD  8.08E-14  6.04E-13 13: 15  05:15    3.06E-13      < LLD  1.87E-13    < LLD  7.86E-14  5.97E-13 13:30  05:30    3.0SE-13      < LLD  1.86E-13    < LLD  7.65E-14  5.90E-13 20:15  12:15    2.91E-13      < LLD  1.44E-13    < LLD  3.71E-14  4.74E-13 20:30  12:30    2.90E-13      < *LLD l.42E-13    < LLD  3.61E-14  4.71E-13 20:45  12:45    2.90E-13      < LLD  1. 41E-13    < LLD  3.51E-14  4.68E-13 21:00  13:00    2.89E-13      < LLD  1.40E-13    < LLD  3.42E-14  4.65E-13 21:15  13:15    2.89E-13      < LLD  1.39E-13 *    < LLD  3.33E-14  4.62E-13 21:30  13:30    2.SSE-13      < LLD  1. 37E-13    < LLD  3.24E-14  4.59E-13 21:45  13:45    2.SSE-13      < LLD  1. 36E-13    < LLD  3.15E-14  4.56E-13 22:00  14:00    2.87E-l3      < LLD  1. 35E-13    < LLD  3.07E-:14  4.54E-13 9.1.28
 
Leak Location Concentrations Salem Nuclear Generating Station 06/23/93 Clock Drill  DEI        Kr-85    Kr-87      Kr-88    xe-131m  xe-133 Time  Time  uci/cc      uCi/cc    uCi/cc    uci/cc    uCi/cc  uCi/cc 08:00  00:00 2.40E-16      < LLD    < LLD      < LLD    < LLD    < LLD 08:15  00:15 2.40E-16      < LLD    < LLD      < LLD    < LLD    < LLD 08:30  00:30 2.40E-16      < LLD    < LLD      < LLD    < LLD    < LLD 08:45  00:45 2.39E-16      < LLD    < LLD      < LLD    < LLD    < LLD 09:00  01:00 2.39E-16      < LLD    < LLD      < LLD    < LLD    < LLD 09:15  01:15 2.39E-16      < LLD    < LLD      < LLD    < LLD    < LLD 09:20  01:20 2.39E-16    9.42E-03  5.39E-04  1. 66E-03  < LLD  1. 38E-Ol 09:25  01:25 2.39E-16    5.71E-03  3.27E-04  1. OlE-03.  < LLD  8.38E-02 09:30  01:30 2.39E-16    3.46E-03  l.98E-04  6.lOE-04    < LLD  5.0SE-02 09:45  01:45 2.39E-16    7.72E-04  4.41E-05  l.36E-04    < LLD  1.13E-02 10:00  02:00 2.38E-16    l.72E-04  9.83E-06  3.03E-05    < LLD  2.52E-03 10:15  02:15 2.38E-16      < LLD  2.0SE-06  6.42E-06    < LLD  5.34E-04 10:30  02:30 3.57E-14      < LLD    < LLD      < LLD    < LLD  4.63E-05 10:45  02:45 3.54E-13      < LLD    .<,. LLD    < LLD    <  LLD    < LLD 11:00  03:00 3.52E-13      < LLD    < LLD      < LLD    <  LLD    < LLD
:.1:15 03:15 J.50E-13      < LLD    < LLD      < LLD    <  LLD    < LLD 11:30  03:30 3.48E-13      < LLD    < LLD      < LLD    < LLD    < LLD 11:45  03:45 J.46E-13      < LLD    <  LLD    < LLD    < LLD    < LLD 12:00  04:00 3.45E-13      < LLD    <  LLD    < LLD    < LLD    < LLD 12:15  04:15 3.36E-13      < LLD    <  LLD    < LLD    < LLD    < LLD 12:30  04:30 3.35E-13      < LLD    <  LLD    < LLD    < LLD    < LLD 12:45  04:45 3.40E-13      < LLD    <  LLD    < LLD    < LLD    < LLD 13:00  05:00 3.39E-13      < LLD    <  LLD    < LLD    <LLD.    < LLD
*                            < LLD                < LLD    < LLD    < LLD 13:15  05:15 3.38E-13                <  LLD 13:30  05:30 3.36E-13      < LLD    <  LLD    < LLD    < LLD    < LLD 20:15  12:15 3. llE-13      < LLD    <  LLD    < LLD    < LLD    < LLD 20:30  12:30 3.lOE-13      < LLD    <  LLD    < LLD    < LLD    < LLD 20:45  12:45 3.09E-13      < LLD    <  LLD    < LLD    < LLD    < LLD 21:00  13:00 3.0SE-13      < LLD    <  LLD    < LLD    < LLD    < LLD 21:15  13:15 3.0SE-13      < LLD    <  LLD    < LLD    < LLD    < LLD 21:30  13:30 3.07E-13      < LLD    <  LLD    < LLD    < LLD    < LLD 21:45  13:45 3.06E-13      < LLD    <  LLD    < LLD    < LLD    < LLD 22:00  14:00 3.05E-13      < LLD.    <  LLD    < LLD    < LLD    < LLD 9.1.29
 
Leak Loca~ion Concentrations Clock Drill Time Time oa:oo oo:oo xe-133m uCi/cc
                  < LLD Salem Nuclear Generating Station
:\e-135 uCi/cc
                                < LLD 06/23/93 Total Noble Gas Rb-88 uCi/cc 9.02E-14 uCi/cc
                                                  < LLD sr-89 uci/cc
                                                            < LLD sr-90 uCi/cc
                                                                  < LLD 08:15  00:15    < LLD        < LLD  9.0lE-14    < LLD    < LLD  < LLD 08:30  00:30    < LLD        < LLD  9.00E-14    < LLD    < LLD  < LLD 08:45  00:45    < LLD        < LLD  8.99E-14    < LLD    < LLD  < LLD 09:00  01:00    < LLD        < LLD  8.99E-14    < LLD    < LLD  < LLD 09:15  01:15    < LLD        < LLD  8.98E-14    < LLD    < LLD  < LLD 09:20  01:20  1. 44E-03  4.22E-03  1. 55E-Ol  < LLD    < LLD  < LLD 09:25  01:25  8.74E-04    2.56E-03  9.43E-02    < LLD    < LLD  < LLD 09:30  01:30  5.30E-04    l.55E-03  5.71E-02    < LLD    < LLD  < LLD 09:45  01:45  l.18E-04    3.45E~04  1.27E-02    < LLD    < LLD  < LLD 10:00  02:00  2.63E-05    7.70E-05  2.84E-03    < LLD    < LLD  < LLD 10:15  02:15  5.57E-06    1. 63E-05  6.0lE-04    < LLD    < LLD  < LLD 10:30  02:30  4.84E-07    1. 41E-06  5.2.lE-05  < LLD    < LLD  < LLD 10:45  02:45    < LLD        < LLD  l.31E-ll    < LLD    < LLD  < LLD 11:00  03:00    < LLD        < LLD  l.28E-ll    < LLD    < LLD  < LLD 11:15  03:15    < LLD        < LLD  1.26E-10    < LLD    < LLD  < LLD 11:30  03:30    < LLD        < LLD  l.24E-10    < LLD    < LLD  < LLD 11:45  03:45    < LLD        < LLD  l.22E-10    < LLD    < LLD  < LLD 12:00  04:00    < LLD        < LLD  1.20E-10    < LLD    < LLD  < LLD 12:15  04:15*    < LLD        < LLD  l.16E-10    < LLD    < LLD  < LLD 12:30  04:30    < LLD        < LLD  l.lSE-10    < LLD    < LLD  < LLD 12:45  04:45    < LLD        < LLD  l.16E-10    < LLD    < LLD  < LLD 13:00 05:00    < LLD        < LLD  1.15E-10    < LLD    < LLD  < LLD 13:15  05:15    < LLD        < LLD  l.14E-10    < LLD    < LLD  < LLD 13:30  05:30    < LLD        < LLD  1.13E-10    < LLD    < LLD  < LLD 20:15  12:15    < LLD        < LLD  9.97E-ll    < LLD    < LLD  < LLD 20:30  12 :JO    < LLD        < LLD  9.94E-11    < LLD    < LLD  < LLD
. 20: 45 12: 45    < LLD        < LLD  9.91E-ll    < LLD    < LLD  < LLD 21:00  13:00    < LLD        < LLD *9.SSE-11    < LLD    < LLD  < LLD 21:15  13: 15    < LLD        < LLD  9.SSE-11    < LLD    < LLD  < LLD 21:30  13 :30    < LLD        < LLD  9.82E-11    < LLD    < LLD  < LLD 21:45  13: 45    < LLD        < LLD  9.79E-ll    < LLD    < LLD  < LLD 22:00  14:00    < LLD        < LLD  9.76E-11    < LLD    < LLD  < LLD 9.1.30
 
Leak Loca~ion concen~ra~ions Salem Nuclear Generating Station 06/23/93 Clock Drill Mo-99    Te-129    Te-132    Cs-134    Cs-137 Ba-140 Time  Time  uCi/cc    uci/cc    uCi/cc    uci/cc    uci/cc uci/cc 08:00 00:00  < LLD    < LLD    < LLD    < LLD    < LLD  < LLD 08:15 00:15  < LLD    < LLD    < LLD    < LLD    < LLD  < LLD 08:30 00:30  <  LLD    < LLD    < LLD    < LLD    < LLD  < LLD 08:45 00:45  <  LLD    < LLD    < LLD    < LLD    < LLD  < LLD 09:00 01:00  <  LLD    < LLD    < LLD    < LLD    < LLD  < LLD 09:15 01:15  <  LLD    < LLD    < LLD    < LLD    < LLD  < LLD 09:20 01:20  <  LLD    < LLD    < LLD    < LLD    < LLD  < LLD 09:25 01:25  <  LLD    < LLD    < LLD    < LLD*    < LLD  < LLD 09:30 01:30  <  LLD    < LLD    < LLD    < LLD    < LLD  < LLD 09:45 01:45  <. LLD    < LLD    < LLD    < LLD    < LLD  < LLD 10:00 02:00  <  LLD    < LLD    < LLD    < LLD    < LLD  < LLD 10:15 02:15  <  LLD    < LLD    < LLD    < LLD    < LLD  < LLD 10:30 02:30  <  LLD    < LLD    < LLD    < LLD    < LLD  < LLD 10:45 02:45  <  LLD    < LLD    ....
                                  < LLD    < LLD    < LLD  < LLD 11:00 03:00  <  LLD    < LLD    < LLD    < LLD    < LLD  < LLD 11:15 03:15  <  LLD    < LLD    < LLD    < LLD    < LLD  < LLD 11:30 03:30  <  LLD    < LLD    < LLD    < LLD    < LLD  < LLD 11:45 03:45  <  LLD    < LLD    < LLD    < LLD    < LLD  < LLD 12:00 04:00  < LLD    < LLD    <    LLD  < LLD    < LLD  < LLD 12:15 04:15  < LLD    < LLD    <    LLD  < LLD    < LLD  < LLD 12:30 04:30  < LLD    < LLD    <    LLD  < LLD    < LLD  < LLD 12:45 04:45  < LLD    < LLD    <    LLD  < LLD    < LLD  < LLD 13:00 05:00  < LLD    < LLD          LLD            < LLD
                                  <        < LLD            < LLD 13:15 05:15  < LLD    < LLD    <    LLD  < LLD    < LLD  < LLD 13:30 05:30  < LLD    < LLD    <    LLD  < LLD    < LLD  < LLD 20:15 12:15  < LLD    < LLD    <    LLD  < LLD    < LLD  < LLD 20:30 12:30  < LLD    < LLD    <    LLD  < LLD    < LLD  < LLD 20:45 12:45  < LLD    < LLD    <    LLD  < LLD    < LLD  < LLD 21:00 13:00  < LLD    < LLD    <    LLD  < LLD    < LLD  < LLD 21:15 13:15  < LLD    < LLD    <    LLD  < LLD    < LLD  < LLD 21:30 13:30  < LLD    < LLD    <    LLD  < LLD    < LLD  < LLD 21:45 13:45  < LLD    < LLD    <    LLD  < LLD    < LLD  < LLD 22:00 14:00  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 9.1.31
 
Leak Location Concentrations Salem Nuclear Genarating station 06/23/93 Total    Gross Clock Grill La-140  La-142    ce-144    Particulate Activity Time  Time  uCi/cc  uci/cc    uCi/cc      uCi/cc    uCi/cc 08:00 00:00  < LLD    < LLD    < LLD      l.60E-19  9.07E-14 08:15 00:15  < LLD    < LLD    < LLD      1. 60E-19  9.06E-14 08:30 00:30  < LLD    < LLD    < LLD      1. 60E-19  9.05E-14 08:45 00:45  < LLD    < LLD    < LLD      l.60E-19  9.04E-14 09:00 01:00  < LLD    < LLD    < LLD      1. 60E-19  9.03E-14 09:15 01:15  < LLD    < LLD    < LLD      l.60E-19  9.03E-14 09:20 01:20  < LLD    < LLD    < LLD      1. 60E-19  6.38E-Ol 09:25 01:25  < LLD    < LLD    < LLD      1. 60E-19. 9.43E-02 09:30 01:30  < LLD    < LLD    < LLD      l.60E-19  5.71E-02 09:45 01:45  < LLD    < LLD    < LLD      l.60E-19  1. 27E-02 10:00 02:00  < LLD    < LLD    < LLD      1. 60E-19  2.84E-03 10:15 02:15  < LLD    < LLD    < LLD      1. 60E-19  6.0lE-04 10:30 02:30  < LLD    < LLD    :< .. LLD  2.25E-17  5.21E-05 10:45 02:45  < LLD    < LLD    < LLD      2.16E-16  1.32E-10 11:00 03:00  < LLD    < LLD    < LLD      2.lOE-16  l.29E-10 11:15 03:15  < LLD    < LLD    < LLD      2.05E-16  l.27E-10 11:30 03:30  < LLD    < LLD    < LLD      2.0lE-16  1.24E-10 11:45 03:45  <LLD      < LLD    < LLD      1. 98E-16  1. 23E-10 12:00 04:00  < LLD    < LLD    < LLD      l.95E-16  1.21E-10 12:15 04:15  < LLD    < LLD    < LLD      1.89E-16  1.17E-10 12:30 04:30  < LLD    < LLD    < LLD      1.87E-16  l.15E-10 12:45 04:45  < LLD    < LLD    < LLD      l.89E-16  1.17E-10 13:00 05:00  < LLD    < LLD    < LLD      1.SSE-16  1.15E-10 13:15 05:15  < LLD    < LLD    < LLD      1.86E-16  l.14E-10 13:30 05:30  < LLD    < LLD    < LLD      1.SSE-16  l.13E-10 20:15 12:15  <LLD.    < LLD    < LLD      1.68E-16  1.00E-10 20:30 12:30  < LLD    < LLD    < LLD      l.68E-16  9.98E-11 20:45 12:45  < LLD    < LLD    < LLD      1.67E-16  9.95E-11 21:00 13:00  < LLD    < LLD    < LLD      1.67E-16  9.92E-ll 21:15 13:15  < LLD    < LLD    < LLD      1.66E-16  9.89E-ll 21:30 13:30  < LLD    < LLD    <LLD.      l.66E-16  9.86E-ll.
21:45 13:45  < LLD    < LLD    < LLD      l.66E-16  9.84E-ll.
22:00 14:00  < LLD    < LLD    < LLD      1.65E-l6  9.SlE-11 9.1.3Z
* Clock Time Drill Time LOW VOL PARTIC.
NCPM @C Leak Loca~ion Atmosphere Samples Salem Nuclear Genera~ing station LOW VOL 06/23/93 LOW VOL CARTRIDG CARTRIDG
::'LR/hr @C mR/hr @1' LOW VOL CARTRIDG NCPM @C LOW VOL JBOMB-NG mR/hr @C 08:00 oo:oo < 100      < 0.2      < 0.2      < 100    < 0.2 08:15 00:15 < 100      < 0.2      < 0.2      < 100    < 0.2 08:30 00:30 < 100      < 0.2      < 0.2      < 100    < 0.2 08:45 00:45 < 100      < 0.2      < 0.2      < 100    < 0.2 09:00 01:00 < 100      < 0.2      < 0.2      < 100    < 0.2 09:15 01:15 < 100      < 0.2      < 0.2      < 100    < 0.2 09:20 01:20 < 100      < 0.2      < 0.2      < 100  9.88E+02 09:25 01:25 < 100      < 0.2      < 0.2      < 100  6.03E+02 09:30 01:30 < 100      < 0.2      < 0.2      < 100  3.69E+02 09:45 01:45 < 100      < 0.2      < 0.2      < 100  8.11.E+Ol 10:00 02:00 < 100      < 0.2      < 0.2      < 100  1. 89E+Ol 10:15 02:15 < 100      < 0.2      < 0.2      < 100  3.78E+OO 10:30 02:30 < 100      < 0.2      ~,,0.2    < 100    < 0.2 10:45 02:45 < 100      < 0.2      < 0.2      < 100    < 0.2 11:00 03:00 < 100      < 0.2      < 0.2      < 100    < 0.2 11:15 03:15 < 100      < 0.2      < 0.2      < 100    < 0.2 11:30 03:30 < 100      < 0.2      < 0.2      < 100    < 0.2 11:45 03:45 < 100      < 0.2      < 0.2      < 100    < 0.2 12:00 04:00 < 100      < 0.2      < 0.2      < 100    < 0.2 12:15 04:15 < 100      < 0.2      < 0.2      < 100    < 0.2 12:30 04:30 < 100      < 0.2      < 0.2      < 100    < 0.2 12:45 04:45 < 100      < 0.2      < 0.2      < 100    < 0.2
* 13:00 13:15 13:30 20:15 20:30 20:45 21:00 05:00 05:15 05:30 12:15 12:30 12:45 13:00
              < 100
              < 100
              < 100
              < 100
              < 100
              < 100
              < 100
                          < 0.2
                          < 0.2
                          < 0.2
                          < 0.2
                          < o. 2 ....
                          < 0.2
                          < 0.2
                                      < 0.2
                                      < 0.2
                                      < 0.2
                                      < 0.2
                                      < 0.2
                                      < 0.2
                                      < 0.2
                                                < 100
                                                < 100
                                              . < 100
                                                < 100
                                                < 100
                                                < 100
                                                < 100
                                                          < 0.2
                                                          < 0.2
                                                          < 0.2
                                                          < 0.2
                                                          < 0.2
                                                          < 0.2
                                                          < 0.2 21:15 13:15 < 100      < 0.2      < 0.2      < 100    < 0.2 21:30 13:30 < 100      < 0.2      < 0.2      < 100    < 0.2 21:45 13:45 < 100      < 0.2      < 0.2      < 100    < 0.2 22:00 14:00 < 100      < 0.2      < 0.2      < 100    < 0.2
* 9.1.33
 
Leak Loca~ion Atmosphere samples Salem Nuclear Genera~ing station 06/23/93 LOW VOL    HARN ELLI MARN ELLI  MARNELL I MARNELL I M.ARNELLI Clock Drill  JBOMB-NG      PARTIC. PARTIC. CARTRIDG CARTRIDG  CARTRIDG Time  Time  -:nR/hr @l'    "1R/hr @C  NCPM @C  mR/hr @C mR/hr @1'  NCPM @C 08:00 00:00    < 0.2      < 0.2    < 100      < 0.2    < 0.2    < 100 08:15 00:15    < 0.2      < 0.2    < 100      < 0.2    < 0.2    < 100 08:30 00:30    < 0.2      < 0.2    < 100      < 0.2    < 0.2    < 100 08:45 00:45    < 0.2      < 0.2    < 100      < 0.2    < 0.2    < 100 09:00 01:00    < 0 .* 2    < 0.2    < 100      < 0.2    < 0.2    < 100 09:15 01:15    < 0.2        < 0.2    < 100      < 0.2    < 0.2    < 100 09:20 01:20  1. 80E+OO      < 0.2    < 100      < 0.2    < 0.2    < 100 09:25 01:25  l . llE+OO    < 0.2    < 100      < 0.2    < 0.2    < 100 09:30 01:30  6.71E-Ol      < 0.2    < 100      < 0.2    < 0.2    < 100 09:45 01:45      < 0.2      < 0.2    < 100      < 0.2    < 0.2    < 100 10:00 02:00      < 0.2      < 0.2    < 100      < 0.2    < 0.2    < 100 10:15 02:15      < 0.2      < 0.2    < 100      < 0.2    < 0.2    < 100 10:30 02:30      < 0.2      < 0.2    ~ ... 100  < 0.2    < 0.2    < 100 10:45 02:45      < 0.2      < 0.2    <" 100    < 0.2    < 0.2      < 100 11:00 03:00      < 0.2      < 0.2    < 100      < 0.2    < 0.2      < 100 11:15 03:15      < 0.2      < 0.2    < 100      < 0.2    < 0.2      < 100 11:30 03:30      < 0.2      < 0.2    < 100    < 0.2    < 0.2    < 100 11:45 03:45      < 0.2      < 0.2    < 100    < 0.2    < 0.2      < 100 12:00 04:00      < 0.2      < 0.2    < 100    < 0.2    < 0.2      < 100 12:15 04:15      < 0.2      < 0.2    < 100    < 0.2    < 0.2      < 100 12:30 04:30      < 0.2      < 0.2    < 100    < 0.2    < 0.2      < 100 12:45 04:45      < 0.2      < 0.2    < 100    < 0.2    < 0 *. 2  < 100 13:00 05:00      < 0.2      < 0.2    <.100    < 0.2    < 0.2      < 100 13:15 05:15      < 0.2      < 0.2    < 100      < 0.2    < 0.2    < 100
* 13:30 05:30      < 0.2      < 0.2    < 100      < 0.2    < 0.2      < 100 20:15 12:15      < 0.2      < 0.2    < 100      < 0.2    < 0.2    < 100 20:30 12:30      < 0.2      < 0.2    < 100      < 0.2    < 0.2    < 100 20:45 12:45      < 0.2        < 0.2    < 100      < 0.2    < 0.2    < 100 21:00 13:00      < 0.2        < 0.2    < 100      < 0.2    < 0.2    < 100 21:15 13:15      < 0.2        < 0.2    < 100      < 0.2    < 0.2    < 100 21:30 13:30      < 0.2        < 0.2    < 100      < 0.2    < 0.2    < 100 21:45 13:45    .< 0.2        < 0.2    < 100      < 0.2    < 0.2    < 100 22:00 14:00      < 0.2        < 0.2    < 100      < 0.2    < 0.2    < 100 9.1.34
* Clock Time Drill Time N. GAS Leak Location Atmosphere Samples Salem Nuclear Generating Station MARNELLI MARN ELLI N. GAS mR/hr @C mR/hr @1' 06/23/93 .
08:00  00:00  < 0.2        < 0.2 08:15  00:15  < 0.2        < 0.2 08:30  00:30  < 0.2        < 0.2 08:45  00:45  < 0.2        < 0.2 09:00  01:00  < 0.2        < 0.2 09:15  01:15  < 0.2        < 0.2 09:20  01:20  4.89E+03 8.89E+Od 09:25  01:25  2.96E+03 5.38E+OO 09:30  01:30  1. 80E+03  3.27E+OO 09:45  01:45  4.01E+02 7.27E-Ol 10:00  02:00  8.95E+Ol      < 0.2 10:15  02:15  1. 89E+Ol    < 0.2 10:30 10:45 02:30 02:45
                    < 0.2
                    < .0.2
                                < 0.2
                                < 0.2 11:00  03:00  < 0.2        < 0.2 11:15  03: 15  < 0.2        < 0.2 11:30  03:30  < 0.2        < 0.2 11:45  03:45  < 0.2        < 0.2 12:00  04:00  < 0.2        < 0.2 12:15  04:15  < 0.2        < 0.2 12:30  04:30  < 0.2        < 0.2 12:45  04:45  < 0.2        < 0.2 13: 00 05:00  < 0.2        < 0.2
  .. 13: 15 05:15  < 0.2        < 0.2 13: 30 05:30  < 0.2        < 0.2 20:15  12:15  < 0.2        < 0.2 20:30  12:30  < 0.2        < 0.2 20:45  12:45  < 0.2        < 0.2 21:00  13:00  < 0.2        < 0.2 21:15  13:15  < 0.2        < 0.2 21:30  13:30  < 0.2        < 0.2 21:45  13:45  < 0.2        < 0.2 22:00  14:00  < 0.2        < 0.2 9.1.35
 
Plant vent Concentrations Salem Nuclear Generating Station 06/23/93 Total Clock Drill        I-131    I-132    I-133    I-134      I-135            Iodine Time Time          uci/cc    uCi/cc    uci/cc    uCi"fcc    uCi/cc            uci/cc 08:00 00:00          < LLD    < LLD      < LLD    < LLD      < LLD        4.86E-16 08:15 00:15          < LLD    < LLD      < LLD    < LLD      < LLD        4.85E-16 08:30 00:30          < LLD    < LLD      < LLD    < LLD      < LLD        4.85E-16 08:45 00:45          < LLD    < LLD      < LLD    < LLD      < LLD        4.84E-16 09:00 01:00          < LLD    < LLD    < LLD    < LLD      < LLD        4.84E-16 09:15 01:15          < LLD    < LLD    < LLD    < LLD      < LLD        4.83E-16 09:20 01:20          < LLD    < LLD    < LLD    < LLD      < LLD        4.83E-16 09:25 01:25          < LLD    < LLD    < LLD    < LLD      < LLD        4.83E-16 09:30 01:30          < LLD    < LLD    < LLD    < LLD      < LLD        4.83E-16 09:45 01:45          < LLD    < LLD    < LLD    < LLD      < LLD        4.83E-16 10:00 02:00          < LLD    < LLD    < LLD    < LLD      < LLD        4.82E-16 10:15 02:15        . < LLD    < LLD    < LLD    < LLD      < LLD        4.82E-16 10:30 02:30          < LLD    < LLD    < LLD    < LLD  1. 06E-14 7.22E-14 10:45 02:45      3.llE-13    < LLD  2.06E:.13    < LLD  l.03E-13 7.04E-13 11:00 03:00      3.llE-13    < LLD  2..04E-13    < LLD  1. OOE-13 6.88E-13 11:15 03:15      3.lOE-13    < LLD  2.02E-13    < LLD  9.75E-14 6.74E-13 11:30 03:30      3.09E-13    < LLD  2.00E-13    < LLD  9.49E-14 6.61E-13 11:45 03:45      3.09E-13    < LLD  l.98E-13    < LLD  9.24E-14 6.50E""".13 12:00 04:00      3.0BE-13    < LLD  1. 96E-13    < LLD  8.99E-14 6.39E-13 12:15 04:15      3.02E-13    < LLD  1. 91E-13    < LLD  8.58E-14 6 .* l 7E-13 12:30 04:30      3.0lE-13    < LLD  1. 89E-13    < LLD  8.35E-14 *6.0SE-13 12:45 04:45      3.07E-13    < LLD  1.91E-13    < LLD  8.30E-14 6.12E-13 13:00 05:00      3.06E-13    < LLD  1. 89E-13    < LLD  8.0BE-14 6.04E-13 13:15 05:15      3.06E-13    < LLD  1.87E-13    < LLD  7.86E-14 5.97E-13 13:30 05:30      3.0SE-13    < LLD  1.86E-13    < LLD  7.65E-14 5.90E-13 20:15 12:15      2.91E-13    < LLD  l.44E-13    < LLD  3.71E-14 4.74E-13 2 o: 3 o_ 12: 3 o 2.90E-13    < LLD  1. 42E-13    < LLD  3.61E-14 4.71E-13 20:45 12:45      2.90E-13    < LLD  1.41E-13    < LLD  3.51E-14 4.68E-13 21:00 13:00      2.89E-13    < LLD  1.40E-13    < LLD  3.42E-14 4.65E-13 21:15 13:15      2.89E-13    < LLD  1. 39E-13    < LLD  3.33E-14 4.62E-13 21:30 13:30      2.SSE-13    < LLD  1.37E-13    < LLD  3.24E-14 4.59E-13 21:45 13:45      2.BSE-13    < LLD  1. 36E-13    < LLD  3.lSE-14 4.56E-13 22:00 14:00      2.87E-13    < LLD  1. 35E-13    < LLD  3.07E-14 4.54E-13 9.1.36
                                                            **----*-* **- ----------***- ****:...~: -**--:-:.-:-***-
 
Plant Vent Concentrations Salem Nuclear Generating station 06/23/93 Clock Drill  DEI        Kr-B5      Kr-B7      Kr-BB    Xe-131m  Xe-133 Time  Time  uci/cc    uci/cc    uCi/cc      uCi/cc  uCi/cc  uCi/cc 08:00 00:00 2.40E-16      < LLD      < LLD      < LLD  < LLD    < LLD 08:15 00:15 2.40E-16    <: LLD      < LLD      < LLD  < LLD    < LLD 08:30 00:30 2.40E-16    < LLD      < LLD      < LLD  < LLD    < LLD 08:45 00:45 2.39E-16    < LLD      < LLD      < LLD  < LLD    < LLD 09:00 01:00 2.39E-16    < LLD      < LLD      < LLD  < LLD    < LLD 09:15 01:15 2.39E-16    < LLD      < LLD      < LLD  < LLD    < LLD 09:20 01:20 2.39E-16  9.42E-04  5.39E-05    l.66E-04  < LLD  1. 38E-02 09:25 01:25 2.39E-16  5.71E-04  3.27E-05    1. OlE-04  < LLD  8.JSE-03 09:30 01:30 2.39E-16  3.46E-04  1. 98E-05    6.lOE-05  < LLD  5.0SE-03 09:45 01:45 2.39E-16  7.72E-05  4.41E-06    1. 36E-05  < LLD  l.13E-03 10:00 02:00 2.38E-16      < LLD  9.83E-07    3.03E-06  < LLD  2.52E-04 10:15 02:15 2.38E-16    < LLD      < LLD      < LLD  < LLD  5.34E-05 10:30 02:30 3.57E-14    < LLD      < LLD      < LLD  < LLD    < LLD 10:45 02:45 3.54E-13    < LLD      < LLD      < LLD  < LLD    < LLD 11:00 03:00 J. 52E-13    < LLD      < **r.LD    < LLD  < LLD    < LLD 11:15 03:15 J.50E-13    < LLD      < LLD      < LLD  < LLD    < LLD 11:30 03:30 3.48E-13      < LLD      < LLD      < LLD  < LLD    < LLD 11:45 03:45 J.46E-13      < LLD      < LLD      < LLD  < LLD    < LLD 12:00 04:00 3.45E-13    < LLD      < LLD      < LLD  < LLD    < LLD 12:15 04:15 3.36E-13    < LLD      < LLD      < LLD  < LLD    < LLD 12:30 04:30 3.35E-13    < LLD      < LLD      < LLD  < LLD    < LLD 12:45 04:45 3.40E-13    < LLD      < LLD      < LLD  < LLD    < LLD 13:00 05:00 3.39E-13      < LLD      < LLD      < LLD  < LLD    < LLD
*                          < LLD 13:15 05:15 3.38E-13                < LLD      < LLD  < LLD    < LLD 13:30 05:30 3.36E-13    < LLD      < LLD      < LLD  < LLD    < LLD 20:15 12:15 3.llE-13    < LLD      < LLD      < LLD  < LLD    < LLD 20:30 12:30 3.lOE-13    < LLD      < LLD      < LLD  < LLD    < LLD 20:45 12:45 3.09E-13      < LLD      < LLD      < LLD  < *LLD    < LLD 21:00 13:00 3.0SE-13    < LLD      < LLD      < LLD  < LLD    < LLD 21:15 13:15 3.0SE-13    < LLD      < LLD      < LLD  < LLD    < LLD 21:30 13:30 3.07E-13    < LLD      < LLD      < LLD  < LLD    < LLD 21:45 13:45 3.0GE-13    < LLD      < LLD      < LLD  < LLD    < LLD 22:00 14:00 3.0SE-13    < LLD      < LLD      < LLD  < LLD    < LLD
* 9.1.37
 
Plant Vent concentrations Salem Nuclear Generating Station 06/23/93 Total Clock Drill  Xe-133m    Xe-135      Noble Gas Rb-88  Sr-89  Sr-90 Time  Time    uCi/cc    uci/cc      uci/cc    uci/cc  uci/cc  uci/cc 08:00 00:00    < LLD      < LLD    9.02E-14    < LLD  < LLD  < LLD 08:15 00:15    < LLD      < LLD    9.0lE-14    < LLD  < LLD  < LLD 08:30 00:30    < LLD      < LLD    9.00E-14    < LLD  < LLD  < LLD 08:45 00:45    < LLD      < LLD    8.99E-14    < LLD  < LLD  < LLD 09:00 01:00    < LLD      < LLD    8.99E-14    < LLD  < LLD  < LLD 09:15 01:15    < LLD      < LLD    8.98E-14    < LLD  < LLD  < LLD 09:20 01:20  l.44E-04  4.22E-04    l.55E-02    < LLD  < LLD  < LLD 09:25 01:25  8.74E-05  2.56E-04    9.43E-03    < LLD  < LLD  < LLD 09:30 01:30  5.30E-05  l.55E-04    5.71E-03    < LLD  < LLD  < LLD 09:45 01:45  l.lSE-05  3.45E-05    1. 27E-03  < LLD  < LLD  < LLD 10:00 02:00 -2. 63E-06  7.70E-06    2.84E-04    < LLD  < LLD  < LLD 10:15 02:15  5.57E-07  1. 63E-06    6.0lE-05    < LLD  < LLD  < LLD 10:30 02:30    < LLD      < LLD    5.21E-06    < LLD  < LLD  < LLD 10:45 02:45    < LLD      < LLD    L3iE'-11    < LLD  < LLD  < LLD 11:00 03:00    < LLD      < LLD    1.28E-ll    < LLD  < LLD  < LLD 11:15 03:15    < LLD      < LLD    1.26E-10    < LLD  < LLD  < LLD 11:30 03:30    < LLD      < LLD
* 1. 24E-10    < LLD  < LLD  < LLD 11:45 03:45    < LLD      < LLD    l.22E-10    < LLD  < LLD  < LLD 12:00 04:00    < LLD      < LLD    1. 20E-10  < LLD  < LLD  < LLD 12:15 04:15    < LLD      < LLD    1.16E-10    <*LLD-  < LLD  < LLD 12:30 04:30    < LLD      < LLD    1.15E-10    < LLD  < LLD  < LLD 12:45 04:45    < LLD      < LLD    l.16E-10    < LLD  < LLD  < LLD 13:00 13:15 13:30 20:15 20:30 20:45 21:00 05:00 05:15 05:30 12:1:
12:3(
12:45 13:00
                < LLD
                < LLD
                < LLD
                < LLD
                < LLD
                < LLD
                < LLD LLD LLD LLD LLD LLD LLD LLD l.15E-10 1.14E-10 l.lJE-10 9.97E-ll
__ 9. 94E-11 9.91E-11 9.SSE-11
                                                < LLD
                                                < LLD
                                                < LLD
                                                < LLD
                                                < LLD
                                                < LLD
                                                < LLD LLD LLD LLD LLD LLD LLD LLD
                                                                < LLD
                                                                < LLD
                                                                < LLD
                                                                < LLD
                                                                < LLD
                                                                < LLD
                                                                < LLD 21:15 13:15    < LLD      < LLD    9.SSE-11    < LLD  < LLD  < LLD 21:30 13:30    < LLD      < LLD    9.82E-11    < LLD  < LLD  < LLD 21:45 13:45    < LLD      < LLD    9.79E-11    < LLD  <  LLD  < LLD 22:00 14:00    < LLD      < LLD    9.76E-11    < LLD  <  LLD  < LLD 9.1.38
 
Plant Vent Concentrations Salem Nuclear Generating Station 06/23/93 Clock Drill  Mo-99    Te-129    Te-132    Cs-134    Cs-137 Ba-140 Time  Time  uCi/cc  uci/cc    uCi/cc    uci/cc    uCi/cc uCi/cc 08:00 00:00  < LLD    < LLD      < LLD    < LLD    < LLD  < LLD 08:15 00:15  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 08:30 00:30  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 08:45 00:45  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 09:00 01:00  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 09:15 01:15  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 09:20 01:20  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 09:25 01:25  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 09:30 01:30  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 09:45 01:45  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 10:00 02:00.  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 10:15 02:15  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 10:30 02:30  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 10:45 02:45  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 11:00 03:00  < LLD    < LLD      <  "'LLD  < LLD    < LLD  < LLD 11:15 03:15  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 11:30 03:30  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 11:45 03:45  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 12:00 04:00  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 12:15 04:15  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 12:30 04:30  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 12:45 04:45  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 13:00 05:00  < LLD    < LLD      <  LLD  < LLD    <LLD  < LLD
* 13:15 13:30 20:15 20:30 20:45 21:00 21:15 05:15 05:30 12:15 12:30 12:45 13:00 13:15 LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD LLD
                                                        < LLD
                                                        < LLD
                                                        < LLD
                                                        < LLD
                                                        < LLD
                                                        < LLD
                                                        < LLD LLD LLD LLD LLD LLD LLD LLD 21:30 13:30  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 21:45 13:45  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD 22:00 14:00  < LLD    < LLD      <  LLD  < LLD    < LLD  < LLD
* 9.1.39
 
Plant Vent concentrations Salem Nuclear Generating Station 06/23/93 Total    Gross Clock    Drill  La-140  La-142    ce-144  Particulate Activity Time      Time    uCi/cc  uCi/cc    uci/cc    uCi/cc      uCi/cc 08:00    00:00    < LLD    < LLD    < LLD    1. 60E-19  9.07E-14 08:15    00:15    < LLD    < LLD    < LLD    l.60E-19  9.06E-14 08:30    00:30    < LLD    < LLD    < LLD    1. 60E-19  9.05E-14 08:45    00:45    < LLD    < LLD    < LLD    1. 60E-19  9.04E-14 09:00    01:00    < LLD    < LLD    < LLD    l.GOE-19  9.03E-14 09:15    01:15    < LLD    < LLD    < LLD    1. 60E-19  9.03E-14 09:20    01:20    < LLD    < LLD    < LLD    1. 60E-19  1. SSE-01 09:25    01:25    < LLD    < LLD    < LLD    1.GOE-19  9 .*43E-02 09:30    01:30    < LLD    < LLD    < LLD    l.GOE-19  5.71E-02 09:45    01:45    < LLD    < LLD    < LLD    l.60E-19  1. 27E-02 10:00    02:00    < LLD    < LLD    < LLD    1. 60E-19  2.84E-03 10:15    02:15    < LLD    < LLD    < LLD    l.60E-19  6.0lE-04 10:30    02:30    < LLD    < LLD    < LLD    2.25E-17  5.21E-05 10 ': 4 5 02 : 45  < LLD    < LLD    <"*LLD  2.16E-16  1. 32E:-10 11:00    03:00    < LLD    < LLD    < LLD    2. lOE-1.6 1.29E-10 11:15    03:15    < LLD    < LLD    < LLD    2. 05E-1.6 1. 27E-10 11:30    03:30    < LLD    < LLD    < LLD    2.0lE-16  l.24E-10 11:45    03:45    < LLD    < LLD    < LLD    1. 98E-16  l.23E-10 12:00    04:00    < LLD    < LLD    < LLD    1. 95E-16  1.21E-10 12:15    04:15    < LLD    < LLD.  < LLD    1. 89E-16  l . l 7E-10 12:30    04:30    < LLD    < LLD    < LLD    l.87E-16  l.15E-10 12:45    04:45    < LLD    < LLD    < LLD    l.89E-16  l.17E-10 13:00    05:00    < LLD    < LLD    < LLD    1.SSE-16  1. lSE-10 13:15    05:15    < LLD    < LLD    < LLD    1.SGE-16  l.14E-10 13:30    05:30    < LLD    < LLD    < LLD    1.85E-16  l.13E-10 20:15    12:15    < LLD    < LLD    < LLD    1.68E-16  1.00E-10 20:30    12:30    < LLD    < LLD    < LLD  1. 68E-16  9.98E-ll 20:45    12:45    < LLD    < LLD    < LLD    1.67E-16  9.9SE-11 21:00    13:00    < LLD    < LLD    < LLD    l.67E-16  9.92E-11 21:15    13:15    < LLD    < LLD    < LLD    1.66E-16  9.89E-ll 21:30    13:30    < LLD    < LLD    < LLD    l.66E-16  9.86E-ll 21:45    13:45    < LLD    < LLD    < LLD  1.66E-16  9.84E-ll 22:00    14:00    < LLD    < LLD    < LLD  1. 65E-16  9.SlE-11 9.1.40
* Plant Vent Sample Data Salem Nuclear Generating Station 06/23/93 R41B DOSE/COUNT RATES              R45 GRAB SAMPLE IODINE CARTRIDGE                IODINE CARTRIDGE Clock Drill @ CONT.  @ 1 FT.    @ CONT.    @ CONT.    @ 1 FT.  @ CONT.
Time  Time    mR/hr    mR/hr        CCPM    mR/hr      mR/hr      CCPM 08:00 00:00 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 08:15 00:15 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 08:30 00:30 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 08:45 00:45 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 09:00 01:00 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 09:15 01:15 < 0.2    < 0.2    .< 100      < 0.2      < 0.2    < 100 09:20 01:20 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 09:25 01:25 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 09:30 01:30 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 09:45 01:45 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 10:00 02:00 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 10:15 02:15 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 10:30 02:30 < 0.2    < 0.2      < l:O'O    < 0.2      < 0.2    < 100 10:45 02:45 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 11:00 03:00 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 11:15 03:15 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 11:30 03:30 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 11:45 03:45 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 12:00 04:00 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 12:15 04:15 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 12:30 04:30 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 12:45 04:45 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 13:00 05:00 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 13:15 05:15 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 13:30 05:30 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 20:15 12:15 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 20:30 12:30 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 20:45 12:45 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 21:00 13:00 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 21:15 13:15 < 0.2    < 0.2      < 100    . < o. 2    < 0.2    < 100 21:30 13:30 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 21:45 13:45 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100 22:00 14:00 < 0.2    < 0.2      < 100      < 0.2      < 0.2    < 100
* 9.1.41
 
Plant vent sample Data Salem Nuclear Generating Station 06/23/93 R45 GRAB SAMPLE              SA16 PIG PARTIC. NG (lOOOcc JBOMB)          DOSE RATES Clock Drill @ CONT.    @ CONT.    @ 1 FT.  @ CONT.    @ 1 FT.
Time  Time      CCPM      mR/hr      mR/hr    mR/hr      mR/hr 08:00 00:00 <  100    <  0.2      <  0.2  < 0.2      < 0.2 08:15 00:15 < 100      < 0.2      < 0.2    < 0.2      < 0.2 08:30 00:30 < 100      < 0.2      < 0.2    < 0.2      < 0.2 08:45 00:45 <  100    <  0.2      < 0.2    < 0.2      < 0.2 09:00 01:00 < 100      < 0.2      < 0.2    < 0.2      < 0.2 09:15 01:15 < 100      < 0.2      < 0.2    < 0.2      < 0.2 09:20 01:20 < 100    9.78E+Ol    < 0.2    < 0.2      < 0.2 09:25 01:25 <  100    5.93E+Ol    < 0.2    < 0.2      < 0.2 09:30 01:30 < 100    3.59E+Ol    < 0.2    < 0.2      < 0.2 09:45 01:45 < 100    8.0lE+OO    < 0.2    < 0.2      < 0.2 10:00 02:00 < 100    1.79E+OO    < 0.2    < 0.2      < 0.2 10:15 02:15 < 100    3.78E-Ol    < 0.2    < 0.2      < 0.2 10:30 02:30 < 100      < 0.2      < o* ~"2 < 0.2      < 0.2 10:45 02:45 <  100      < 0.2      < 0.2  < 0.2      < 0.2 11:00 03:00 < 100      < 0.2      < 0.2  < 0.2      < 0.2 11:15 03:15 < 100      < 0.2      < 0.2  < 0.2      < 0.2 11:30 03:30 < 100      < 0.2      < 0.2  < 0.2      < 0.2 11:45 03:45 < 100      < o. 2.    < 0.2  < 0.2      < 0.2 12:00 04:00 < 100      < 0.2      < 0.2    < 0.2      < 0.2 12:15 04:15 < 100      < 0.2      < 0.2    < 0.2      < 0.2 12:30 04:30 < 100      < 0.2      < 0.2    < 0.2      < 0.2 12:45 04:45 < 100      < 0.2      < 0.2    < 0.2      < 0.2 13:00 05:00 < 100      < 0.2      < 0.2    < 0.2      < 0.2 13:15 05:15 < 100      < 0.2      < 0.2    < 0.2      < 0.2 13:30 05:30 < 100      < 0.2      < 0.2    < 0.2      < 0.2 20:15 12:15  < 100      < 0.2    *< 0.2    < 0.2      < 0.2 20:30 12:30  < 100      < 0.2    .. < 0.2    < 0.2      < 0.2 20:45 12:45  < 100      < 0.2      < 0.2    < 0.2      < 0.2 21:00 13:00  < 100      < 0.2      < 0.2    < 0.2      < 0.2 21:15 13:15  < 100      < 0.2      < 0.2    < 0.2      < 0.2 21:30 13:30  < 100      < 0.2      < 0.2    < 0.2      < 0.2 21:45 13:45  < 100      < 0.2      < 0.2    < 0.2      < 0.2 22:00 14:00  < 100      < 0.2      < 0.2    <  0.2    < 0.2 9.1.42
* SALEM U/1 RMS QUICK REFE-RENCE RAD                          ALARM
* 9.2.1
 
SALEM U/1 RMS QUICK REFERENCE RAD MONITOR                                                DESCRIPTION WARNING SETPOINT
[Ititfittt::::::::::::::::r:::::r:::::rittIIIfifffff]]lllllilfittl:ttltlff'lI!IlfiftftfttIIIlflff]flIIIttlitlltitltttfttmtrttflfJ]]fid ALARM SETPOINT                    UNITS R33                              ION EXHANGE FILTER                                                                                1.50E+01                  2.00E+01                    R/HR R3~A://*.*.******._*,::>Mg9.fiA~1cA4.:~Ft\J.$~t19N.iGEN~RA~Af=iEAf\'''>&sect;~Q9.g+,qg::.'f), t~9bE.f:P~{t::.**::MR!B.8:::{'::(
R36                              EVAPORATOR AND FEADWATER PREHEAT CON 1.50E+04                                                                                3.50E+04                      CPM R40t i :.*. *.* ***.:..*. **.:*.:gf}NDENSATE. F!4fERCONDENSATE.POLISH.&sect;.R/.**2:ooE:+.6o>:\ {*'**&sect;:;QQs*QQ!": /. _;,MW,fJ:f1::f :.;::*:
R41 A                            PLANT VENT PARTICULATE                                                                            9.00E+04                  1.30E+05                      CPM R4:1~H;*<    , .: . , ,:'::R:~tiJm:*o/gNTt9.C?!N~t:::.*:, ,; : :*,. L ( , * }: ., . ::.::: t::) *, } *&sect;/$&sect;~+Q4::;::::::1:-:::~;$?.s+~J::, :::::;9eM:t:::: . >.:.:
R41 C                            PLANT VENT NOBLE GAS                                                                              1.60E+04                  3.20E+04                      CPM R43.t ::*:* :                :,. 011:::'~::_2if>t.Af\Jt::VE:Nt <3E.N$*RAL'AFtE:A./::. * \ ;: : <s~ooE:ioa: : : . *,._1/oqgf91i:* *r,** MR!ff R<n: :
R44A                            CONTAINMENT GENERAL AREA HIGH RANGE 13 1.00E+02                                                                              1.00E+03                    R/HR R44EL{ ** .. * *.*:* . ''!''*9.PN"t.Ai~'MENT''GENERAL2AA.EA:Hf&#xa2;RFANGE'.::1*o:.                                                      ,\o()gtfq?:i!?! :Itqgl;t'6?.::::-:: :: . .,.:::st.tlf.!:*:t:::*rn*r; R45A                            PLANT VENT NOBLE GAS BKGD SUBTRACT                                                                      N/A                1.00E+06                      CPM R4se:r::*: :* .*.._.*** ,:**RP.ANtV~NTN9~-~e:*GAs.*'-"'1sP 1.lJM*-'RANG~:.::...-; :-:                                        :.=:\*d ;S._9.~+02:;.r.:..**-**. $!'C>PEt;92. ti'. .::'.~9.l!P9t*:::::::
* R45C                            PLANT VENT NOB~E GAS HIGH RANGE                                                                    1.00E+01                  1.00E+02                  uCi/CC R49g::::\'*** ; :*: *: : : ,:RGANJt:yE:~JJJf!tTI:.B-::t~.9.t!1r.9fl:t?*:*.        .:-::::*::::.t:::-::::::*=**=:::::::**:*-** :*r:.:,1:;goe+o~**::m*::.*:    *:+.*qqg+_g&sect;::.::::::1:*:::.]::::P.l~M;:::::.it?:
R46A,B,C&D                      MAIN STEAM LINES                                                                                  5.00E+OO                  1.00E+01                  MR/HR
.A~~~::::*        : : *: ;: *: !-)~&sect;5=9.NRA:NJ'.!iR9R*:fi4.&sect;~:i~:i.&#xa2;.~q*1*::::0.:    :...-.:**.. :: *: :.                  :***.****-~-~?.l?!=+/-.9.9..:
* g;$.~~i9.<t            .      *M~HR. *** ..
R47                              ELECTRICAL PEN. GENERAL AREA HIGH RANGE 6.00E+03                                                                            1.20E+04                  MR/HR 9.2.2
* SALEM U/2 RMS QUICK REFERENCE RAD MONITOR                                                                                          DESCRIPTION l=tt='Ift:f{!t'tlmttn::::::::fflf!filII!ll'Jttt:::::::::::ft]f!l!f]:::::t:'f]f]'!::::f!'lfIIJf::r::::::::ftf!f!fiftfIItff!flftflfttfflffflflf:t::::::::::ttff!fftf'l::I WARNING SETPOINT ALARM SETPOINT                      UNITS R1A                                            CONTROL ROOM GENERAL AREA                                                                                                                                                  2.SOE+OO        5.00E+OO                  MR/HR RtB< : .*.*                                    CONTROL'AOQMl~T/\KEDUCT}*.                                                                                                                                    ..      ::j 6~00E:+o2=::/): t:ooE:+o3::\ :9P~/'/(                                >:
R2                                            CONTAINMENT LOW RANGE GENERAL AREA                                                                                                                                                                                    MR/HR R4// .. ** .*                                *CHARGING:Pli.MPGENERALAREA:.*** .***                                                                                                                                                                        .:. : *. MRiHRr/: .
RS                                            SPENT FUEL POOL GENERAL AREA                                                                                                                                                                                          MR/HR
:INCb.RE:*:sEAt::*TABtE**.CTMT;:~i:oo*~\/J::.:::*:::                                                                          .                                                                                    :***.*:"MRiH"FL=t                ;;}i R9 R10A* '//
R1lA R12A R12B ...
:--:*:::: ........::*:=:***:*-:*.: ...;:*.*.-*:-*--*-:*-*.. .
R16                                            PLANT VENT EFFLUENT CONTAINMENT R11A&e < .                                  *. #21::&::22:cofii1P..oisfeNT:caou:NG:flxjs r
R18                                            LIQUID RAD WASTE Ri9A;s:;c&D/.* STEAM:GENERATOR\BilbWDbW.N/
R24A R248<='    * /::*:*:*:*:*:*":*****
                                                  #2 SEAL WATER FILTER                                                                                                                                                      1.50E+04        2.00E+04                  MR/HR
:. .8.~<51"9R\Q@:9~~*r:!1i:bTB.;i:=::::::::.:::::%':jj:::*:::.::::::::.::::::r:l::.{: .t:.?.1:;~q&sect;f:g4:::,::::: : ::::;g;,gq&sect;f:.Q~:*=:=t:::::::MR!HfrtI:t:
LIQUID WASTE FILTER                                                                                                                                                        1.00E+02        1.00E+03                  MR/HR
    .. ...... *. :' ..*.* *** *:.. :~.F.?-~N:r;:5q&sect;ikRQQg*F:!&#xa5;I&sect;BH:::::::::.\:j:j /:i::::::{::::::::::::::::t::::::t: ::::::tt::t:11:~soe4:'.d4\U: >/?;bbeit64}*tt:*: ~:R!fflf[:{:.:::::::::
SPENT FUEL SKIMMER FILTER                                                                                                                                                  1.00E+02        1.00E+03                  MR/HR
                          * * * * * * .* .: :. *:*~:t;F:p&sect;g1.N<$.:=:Y\'.~!:~:::g@~!Ft&#xa2;;AI~P:t~~::&sect;!:!#.i.:R]:::::.::::::::j:::::::::~:::~9J~+/-91::::::: .:.:::~i9'.9~&#xa5;9~>\t.::                                                                                        MB!Hf:t:t:*t::
LETDOWN HX FAILED FUEL                                                                                                                                                    3.42E+05        6.83E+05                  CPM
:            *$egNm::&sect;&#xb5;gg;)J.AflbLiN~:;&#xa2;.RAN.&sect;:::::=:::::.: *.:::*:::::::::::::::::::::::=:]]:::::::j:::::::,::;2::Q.Q&sect;+/-gjt: :*                                                                          :.4.'.0Q,$+9.j::Jt:.:.::;.@mB.@::::::j(,
ION EXHANGE FILTER                                                                                                                                                        1.50E+04        2.00E+04                  MR/HR
            * * * * * * ** ........ ?"11:&sect;&#xa2;.:fiAN.J91bi!:e&sect;~&sect;t~T!QN;::&sect;&sect;iJ.gRAg:::~g&sect;A::::::::::::::::::::::.&sect;;:PP.&sect;+9?::*::::::ii::f;Q9&sect;&#xa3;g~**:::r::::::::::J~filtfB.::::::::::::::::::
EVAPORATOR AND FEADWATER PREHEAT CON 1.77E+04                                                                                                                                              2.65E+04                  CPM
        ..*........:,:::::::::::.:.::::.rtJe>mti:&sect;~q~9~9;1v,g*:.p941;9:::Y.&'~~:t&#xa2;:*:&sect;A&sect;~f1:::f::::::::::::::::::::::::::::::::::&sect;:~gg&#xa3;g~:::::::::::::.::::::::::1::;pg.g+/-,g4*::::=::::t:::::&#xa2;:f.!w::::::::::::::::::t:::::::
CONDENSATE FILTER CONDENSATE POLISHER                                                                                                                                      2.00E+OO        5.00E+OO                  MR/HR
:e~Nm::&#xa5;&sect;Nm::e~B.m!P:!!:~m&sect;::::=:::.,::::::.::\:::::::::::::::::1::::::::::::::::::]:::::1:::::::::=::::::::::::::::::::::@1P:9.&sect;+9:~:J:::::::::::::::::1::1..~:g,g1Q.&sect;::::r:.t:3P:1t~:=:%::::t1:1:::
PLANT VENT IODINE                                                                                                                                                          5.55E+04        8.33E+04                  CPM
:=:*e~NT1:&#xa5;&sect;Nm::~9~&#xb5;,g::&sect;?i&sect;::::::::::::.::::::::::=:::::::f:::::::=:::::::::j::::::]:::::::::::::::::::::::::::::::::::::=:::::::::*:=::::::l;:;&sect;9:&sect;+/-Q!:i::::::.=::::=::::?;~9g11Q!1::::::::::::::P.:eM]::::::::t:::::::::::::
WASTE DECAY TANKS                                                                                                                                                          2.50E+04        4.00E+04                  MR/HR r:::&#xa2;.t?Nr~!NM.&sect;mm:=@&sect;N.&sect;ffl:~g::~@*g~::tn@m==:a~N&sect;:g:::1'.:~:::im;:q,p,gt,9g:l::f:::::::::::1::;9g.gt,9~:::]::::::::::::::m~8:1:::::::::::::]::::
R44B                                            CONTAINMENT GENERAL AREA HIGH RANGE 10 1.00E+02                                                                                                                                            1.00E+03                  R/HR
* 9.2.3
 
SALEM U/2 RMS QUICK REFE,RENCE RAD MONITOR                                  DESCRIPTION WARNING SETPOINT ALARM SETPOINT              UNITS 1:r1r1=1::1:11:::::1rr11r1rr:::::1::11itr11111r1r:r1:::::1ttttrrt:=::t1rr111i1r:r1:mrtttttttrtttttt1i:tt11rrrr=:r111111:=::::::,:r1rm1rrr1r1:::11 R45A .*.*              PLANTVENTNOBL~*GA~              BKGD SUBTRACT                  *=  .  . .. * *. . . N/A::: , 1;00E+06 *.** = . CPM??
* R458                  PLANT VENT NOBLE GAS MEDIUM RANGE                                        1.SOE-02            3.00E-02          uCi/CC R4sc:.***** * * .*. *****PLANt:vENi\fi.h:5aLE:<3As:HtGi+*RANGE=<*                          =_\YJ*1.(>0E::tot** =j\()0E+o2* < uc*iicc>::/.*
R45D                  PLANT VENT FILTER MONITOR                                                1.00E+06            1.00E+06          CPM
::AsA;e;c&o< .MA1t\l::&sect;i:EAM=tiNEs/*tt .:***                                    *.... * * :::_*\:&sect;:oog+*oo :=:/      1:00E+o1 > ** . MR1HF.i:::::.**
R46E                  REDUNDANT FOR R46A,B,C&D                                                  1.50E+OO            2.50E+OO          MR/HR R4t./ *.. *.*. :::::-. >EtE:&#xa2;'.f.RICAi3PENfrGENERALA.FfEAHfGHFfANGEf:&sect;.i99~&#xa5;03.: :* 1:26~$()4*.:) >MR/HR?\>
R52                    LIQUID PASS ROOM AREA                                                    1.00E+02            1.00E+03          MR/HR 9.2.4
 
ELEVA TIDN 122                                  1R46 ABCDE SG22                                                                                  SG12 SG24                                                                                            SG14
                ~
2R32: "b  .. ,..~CJ CJ CJ CJ~ifc;~~*  ~
                ~                              ~
                                                  ~S BT ClCVlllTU>I ARTU'ICl"'- ISLAND [1RCiUCT PR[P~[tt&#xa3;SS l[V, L  UPTCMICR I~ "H CD. SCll.L>
 
ELEVATION 100 etR23 I    =E~ ___!!]                                            =
I
      ~ rn mo omrn~
            ~ ~ ~ ~*~ ~ ~                ~ ~ ~*~ ~ ~ ~
      ~ ~ ~ ~ ~ ~ ~ r~
frO 2 RD.AY & D...ECTli:ICAL RM.
                                        ~li ~ ~ ~ ~ ~ ~ ~
NO, I RCLAT & ELECTllCAL. RH.
ELEVATION 110 RHS BY ELEVATJON ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS REV. I SEPTEMBER IS, 1989 <D. SCULL>
 
ELEVA TIDN    84 IS-  L I~----~
71
      '------;====--!::!.
AMS IY [l[VA TJON ARTIF'JCIAL ISLAND [H[AGENCY PRtPAR[DNns REV. I  StPTEHl!IER 1'. 190'9 CD. SCLLL>
2R18  1R18
 
ELEVA TIDN 64 I
l*...imvvn1Lai1I              l*m--Yn.. IUll IG.l RrU.f I. n.tCTllCAL JIDI 1.. c~vrr11.ul I                I n
(R]p *""'-I tJ 2R42A 2R42B -11m!iiiiiiliiM*lr-.
2R42D                                                                      t.n U  HCJ..D-U~ TN<<
2R42C        NQ. !I IGJ-oLP TN<<                                          NU. 12  HDL.D~ TNt<
ND. 131 HDUH.P TNI(
RMS BY ELEVATION ARTIFICIAL ISLAND EMERGENCY PREPAREDNESS REV. 1 SEPTEMBER 15, 1989 <D. SCULL>
 
ELEVA TIDN 55 45 REACTUI PlT                        REACTrR PIT RMS BY [L[VATICN AATIFICIAL ISLAND EMERGrNCY PREPAREDNESS REV. 1 SEPTEMBER 1~ 1989 <D. SCULL>
 
PLANT VENT FLOW RATES AND MET DATA REAL DRILL  PLANT VENT        WIND SPD      WIND SPD    WIND SPD.
TIME TIME      CCFMl          33 I (MPH)    150 I (MPH) 300 I (MPH) 0800  0000      64000            5.50          6.50      7.50 0830  0030      64000            5.61          6.61      7.61 0900  0100      64000            5.71          6.71      7.71 0930  0130      64000            5.82          6.82      7.82 1000  0200      64000            5.93          6'. 93    7.93 1030  0230    103000            6.04          7.04      8.04 1100  0300    103000            6.14          7.14      8.14 1130  0330    103000            6.25          7.25      8.25 1200  0400    103000            6.36          7.36      8.36 1230  0430    103000            6.46          7.46      8.46 1300  0500    64000            6.57          7.57      8.57 1330 1400 1430 0530 2000 2030 64000 64000 64000 64000 6.68 8.07 8.18 8.29 7.68
                                                *9.07 9.18 9.29 8.68 10.07 10.18 10.29 1500  2.100 1530  2130    64000            8.39          9.39    10.39 1600  2200    64000            8.50          9.50    10.50 9.2.10
* PLANT VENT FLOW RATES AN!) MET DATA
.REAL    DRILL WIND DIR. STABILITY  DELTA T 150 1 -33' DELTA T 300 1 -33' TIME  TIME  (DEGREES)      CLASS    (DEGREES CENT)    CDEGRESS CENT) 0800  0000  296.00        F          1. 00            1.40 0830  0030  293.72        F          1. 00            1.40 0900  0100  291.44        F          1. 00            1.40 0930  0130  286.50        F          1. 00            1.40 1000  0200  266.00        F          1. 00            1.40 1030  0230  250.00        F          1. 00            1.40 1100  '0300  244.22        F          1.00              1.40 1130  0330  242.67        F          1. 00            1.40 1200  0400  241.11        F          1. 00            1.40 1230  0430  239.56        F          1. 00            1.40 1300  0500  238.00        F          1.00              1.40
.1330    0530  236.44        F          1. 00            1.40 1400  2000  216.22        F          1. 00            1.40 1430  2030  214.67        F          1.00              1.40 1500  2100  213.11        F          1.00              1.40 1530  2130  211.56        F          1.00              1.40 1600  2200  210.00        F          1.00              1.40
* 9.2.11
 
Radiation Monitorin~ System Salem Nuclear Generating Station 06/23/93 Control  cntrl Rm      cntmt Charging        Fuel        Seal Room      Vent              Pump Rm        Bldg        Table Clock Drill      RlA      RlB          R2        R4        RS          R7 Time  Time      mR/hr      CPM      mR/hr    mR/hr      mR/hr        mR/hr 08:00 00:00  2.00E-01  4.00E+Ol  2.00E-01  1. OOE-01 1. OOE-01  2.00E-01 08:15 00:15  2.00E-01  4.00E+Ol  2.00E-01  1. OOE-01 1. OOE-01  2.00E-01 08:30 00:30  2.00E-01  4.00E+Ol  2.00E-01  1. OOE-01 1. OOE-01  2.00E-01 08:45 00:45  2.00E-01  4.00E+Ol  2.00E-01  1. OOE-01 1. OOE-01  2.00E-01 09:00 01:00  2.00E-01  4.00E+Ol  2.00E-01  1. OOE-01 1. OOE-01  2.00E-01 09:15 01:15  2.00E-01  4.00E+Ol  2.00E-01  1. OOE-01 J,..OOE-01 2.00E-01 09:20 01:20  2.00E-01  4.00E+Ol  2.00E-01  1. OOE-01 1. OOE-01  2.00E-01 09:25 01:25  2.00E-01  4.00E+Ol  2.00E-01  1. OOE-01 1. OOE-01  2.00E-01 09:30 01:30  2.00E-01  4.00E+Ol  2.00E-01  1. OOE-01 1. OOE-01  2.00E-01 09:45 01:45  2.00E-01  4.00E+Ol  2.00E-01  1. OOE-01 1. OOE-01  2.00E-01 10:00 02:00  2.00E-01  4.00E+Ol  2.00E-01  1. OOE-01 1. OOE-01  2.00E-01 10:15 02:15  2.00E-01  4.00E+Ol  2.00E~Ol  1. OOE-01 1. OOE-01  2.00E-01 10:30 02:30  2.00E-01  4.00E+Ol  2.05E-Ol  1. OOE-01 1. OOE-01  2.0SE-01 10:45 02:45  2.00E-01  4.00E+Ol  1. 03E+OO  1. OOE-01 1. OOE-01  l.03E+OO 11:00 03:00  2.00E-01  4.00E+Ol  1. OlE+OO  1. OOE-01 1.00E-01  1. OlE+OO 11:15 03:15  2.00E-01  4.00E+Ol  9.89E-Ol  1. OOE-01 1. OOE-01  9.89E-Ol 11:30 03:30  2.00E-01  4.00E+Ol  9.72E-Ol  1. OOE-01 1. OOE-01  9.72E-Ol 11:45 03:45  2.00E-01  4.00E+Ol  9.57E-Ol  1. OOE-01 1. OOE-01  9.57E-Ol 12:00 04:00  2.00E-01  4.00E+Ol  9.43E-Ol  1. OOE-01 1. OOE-01  9.43E-Ol 12;15 04:15  2.00E-01  4.00E+Ol  9.31E-Ol  l.OOE-01  l.OOE-01  9.31E-Ol 12~30 04:30  2.00E-01  4.00E+Ol  9.19E-Ol  1.00E-01  1. OOE-01  9.19E-Ol 12:45 13:00 13:15 13:30 20:15 20:30 20:45 04:45 05:00 05:15 05:30 12:15 12:30 12:45 2.00E-01 2.00E-01 2.00E-01 2.00E-01 2.00E-01 2.00E-01 2.00E-01 4.00E+Ol 4.00E+Ol 4.00E+Ol 4.00E+Ol 4.00E+Ol 4.00E+Ol 4.00E+Ol 9.09E-Ol 9.00E-01 8.91E-Ol 8.83E-Ol 7.74E-Ol 7.72E-Ol 7.69E-Ol
: 1. OOE-01
: 1. OOE-01 1.00E-01 1.00E-01
: 1. OOE-01 l.OOE-01 1.00E-01
: 1. OOE-01
: 1. OOE-01 l.OOE-01
: 1. OOE-01
: 1. OOE-01
: 1. OOE-01 l.OOE-01 9.09E-Ol 9.00E-01 8.91E-Ol
:::
* 83E-Ol 7.74E-Ol 7.72E-Ol 7.69E-Ol 21:00 13:00  2.00E-01  4.00E+Ol  7.67E-Ol  l.OOE-01  1. OOE-01  7.67E-Ol 21:15 13: 15 2.00E-01  4.00E+Ol  7.64E-Ol  l.OOE-01  1.00E-01  7.64E-Ol 21:30 13: 30 2.00E-01  4.00E+Ol  7.62E-Ol  1.00E-01  l.OOE-01  7.62E-Ol 21:45 13:45  2.00E-01  4.00E+Ol  7.59E-Ol  1. OOE-01 1.00E-01  7.59E-Ol 22:00 14:00  2.00E-01  4.00E+Ol  7.57E-Ol  l.OOE-01  1.00E-01  7.57E-Ol 9.2.12
 
Radiation Monitorin~ System Salem Nuclear Generating Station 06/23/93 Fuel    Person      Person    Cntmt    Cntmt    Cntmt storage  Htch 100 1 Htch 130 1      Part. Nbl Gas    Iodine Clock Drill              R9      RlOA        RlOB      RllA      Rl2A      Rl2B Time Time            mR/hr      mR/hr        mR/hr      CPM      CPM      CPM 08:00 00:00      1. OOE-01  2.00E-01  2.00E-01    1. OOE+Ol 1. OOE+OO 2.51E+02 08:15 00:15      1. OOE-01  2.00E-01  2.00E-01    1. OOE+Ol 1. OOE+OO 2.51E+02 08:30 00:30      l.OOE-01  2.00E-01  2.00E-01    1. OOE+Ol 1. OOE+OO 2.51E+02 08:45 00:45      1. OOE-01  2.00E-01  2.00E-01    1. OOE+Ol 1. OOE+OO 2.51E+02 09:00 01:00      1. OOE-01  2.00E-01  2.00E-01    1.00E+Ol  1. OOE+OO 2.51E+02 09:15 01:15      1. OOE-01  2.00E-01  2 .* OOE-01 1. OOE+Ol 1. OOE+OO 2.51E+02 09:20 .01:20      1.00E-01  2.00E-01  2.00E-01    1. OOE+Ol 1. OOE+OO 2.51E+02 09:25 01:25      1. OOE-01  2.00E-01  2.00E-01    1. OOE+Ol 1. OOE+OO 2.51E+02 09:30 01:30      1. OOE-01  2.00E~Ol  2.00E-01    1. OOE+Ol 1. OOE+OO 2.51E+02 09:45 01:45      1. OOE-01  2.00E-01  2.00E-01    1. OOE+Ol 1. OOE+OO 2.51E+02 10:00 02:00      1. OOE-01  2.00E-01  2.00E-01    1. OOE+Ol 1. OOE+OO 2.51E+02 10:15 02:15      1. OOE-01  2.00E-01  2.00E-01    1. OOE+Ol 1. OOE+OO 2.51E+02 10:30 02:30      1. OOE-01  2.05E-Ol  2.05E-Ol    1.78E+03  1.78E+03  1. 78E+03 10:45 02:45      1. OOE-01  1. 03E+OO  1. 03E+OO  1.78E+03  l.78E+03  l.78E+03 11:00 03:00      1. OOE-01  1.0lE+OO  1. OlE+OO  1. 78E+03 1.78E+03  1. 78E+03 11:15 03:15      1. OOE-01  9.89E-Ol  9.89E-Ol    1.78E+03  1.78E+03  1. 78E+03 11:30 03:30      1. OOE-01  9.72E-Ol  9.72E-Ol    1. 78E+03 1.78E+03  1. 78E+03 11:45 03:45      1. OOE-01  9.57E-Ol  9.57E-Ol    1. 78E+03 1. 78E+03 1. 78E+03 12:00 04:00      1. OOE-01  9~43E-Ol  9.43E-Ol    1. 78E+03 1. 78E+03 1. 78E+03 12:15 04:15      1. OOE-01  9.31E-Ol  9.JlE-01    1. 78E+03 1. 78E+03 1. 78E+03 12:30 04:30      1. OOE-01  9.19E-Ol  9.19E-Ol    1. 78E+03 1.78E+03  1. 78E+03 12:45 04:45      1. OOE-01  9.09E-Ol  9.09E-Ol    1. 78E+03 l.78E+03  1. 78E+03 13:00 05:00      1. OOE-01  9.00E-01  9.00E-01    1. 78E+03 1.78E+03  1. 78E+03 13:15 05:15      1. OOE-01  8.91E-Ol  8.91E-Ol    1. 78E+03 1.78E+03  1. 78E+03 13:30 05:30      1. OOE-01  8.83E-Ol  8.SJE-01    1. 78E+03 1.78E+03  1.78E+03 2 0 : 15 -12 : 15 1. OOE-01  7.74E-Ol  7.74E-Ol    1. 78E+03 1. 78E+03 1. 78E+03 20:30 12:30      1. OOE-01  7.72E-Ol  7.72E-Ol    1. 78E+03 1. 78E+03 1. 78E+03 20:45 12:45      1.00E-01  7.69E-Ol  7.69E-Ol    l.78E+03  1. 78E+03 1. 78E+03 21:00 13:00      1.00E-01  7.67E-Ol  7.67E-Ol    1.78E+03  1. 78E+03 1. 78E+03 21:15 13:15      1. OOE-01  7.64E-Ol  7.64E-Ol    1. 78E+03 1. 78E+03 1. 78E+03 21:30 13:30      1. OOE-01  7.62E-Ol  7.62E-Ol    1. 78E+03 1. 78E+03 1. 78E+03 21:45 13:45      1. OOE-01  7.59E-Ol  7.59E-Ol    1. 78E+03 1. 78E+03 1. 78E+03 22:00 14:00      1. OOE-01  7.57E-Ol  7.57E-Ol    1. 78E+03 1. 78E+03 1.78E+03
* 9.2.13
 
Radiation Monitorin9 System Salem Nuclear Generating Station 06/23/93 21 Fan 22/24Fan    23/25Fan                    Condnsr S W Wtr    S W Wtr    S W Wtr                  Air Ejct Clock    Drill      Rl3A      Rl3B        Rl3C  Rl3D    Rl3E      R15 Time    Time        CPM        CPM,        CPM    CPM      CPM      CPM 08:00    00:00  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 08:15    00:15  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 08:30    00:30  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 08:45    00:45  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 09:00    01:00  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 09:15    01:15 *6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 09:20    01:20  6.00E+Ol 3.50E+02      1.05E+02    N/A      N/A  3.00E+Ol 09:25    01:25  6.00E+Ol 3.50E+02      1.05E+02    N/A      N/A  3.00E+Ol 09:30    01:30  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 09!45    01:45  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 10:00    02:00  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 10:15    02:15  6.00E+Ol 3.50E+02. l.05E+02    N/A      N/A  3.00E+Ol 10:30    02:30  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 10:45    02:45  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 11:00    03:00  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 11:15    03:15  6.00E+Ol 3.50E+02      1.05E+02    N/A      N/A  3.00E+Ol 11:30    03:30  6.00E+Ol 3.50E+02      1. 05E+02  N/A      N/A  3.00E+Ol 11:45    03:45  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 12:00    04:00  6. QOE+Ol
* 3.50E+02  1. 05E+02  N/A      N/A  3.00E+Ol 12:15    04:15  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 12:30    04:30  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 12:45    04:45  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 13:00    05:00  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 13: 15  05:15  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 13:30    05:30  6.00E+Ol 3.50E+02      1. 05E+02  N/A      N/A  3.00E+Ol 20: ,15  12:15  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 20:30  *12:30  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 20:45    12:45  6.00E+Ol 3.SOE+02      l.05E+02    N/A      N/A  3.00E+Ol 21:00    13:00  6.00E+Ol 3.50E+02      1.05E+02    N/A      N/A  3.00E+Ol 21:15    13:15  6.00E+Ol 3.50E+02      1.05E+02    N/A      N/A  3.00E+Ol 21:30    13:30  6.00E+Ol 3.50E+02      1.05E+02    N/A      N/A  3.00E+Ol 21:45    13:45  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 22:00    14:00  6.00E+Ol 3.50E+02      l.05E+02    N/A      N/A  3.00E+Ol 9.2.14                              **
 
Radiation Monitorin9 System .
Salem Nuclear Generating Station 06/23/93 Plnt vnt      Cmpnt      Cmpnt    Liquid      21 S/G    22 S/G Grs Beta  Cool Wtr  Cool Wtr      Waste      Blowdn    Blowdn Clock  Drill        R16      R17A        R17B      R18        R19A      R19B Time  Time        CPM        CPM          CPM      CPM        CPM      CPM 08:00  00:00  1.10E+02  1. OOE+02  1.00E+02    5.00E+04 2.22E+02    1. 72E+02 08:15  00:15  1.10E+02  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1. 72E+02 08:30  00:30  1.10E+02  1. OOE+02  1.00E+02    5.00E+04 2.22E+02    1. 72E+02 08:45  00:45  1.10E+02  1. OOE+02  1.00E+02    5.00E+04 2.22E+02    1.72E+02 09:00  01:00  1.10E+02  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1.72E+02 09:15  01:15  1.10E+02  1.00E+02  1.00E+02    5.00E+04 2 .* 22E+02 1. 72E+02 09:20  01:20  5.86E+03  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1. 72E+02 09:25  01:25  1. 74E+04  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1. 72E+02 09:30  01:30  1. 88E+04  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1. 72E+02 09:45  01:45  4.19E+04  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1.72E+02 10:00  02:00  9.34E+03  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1. 72E+02 10:15  02:15  1.99E+03  l.OOE+02  1. OOE+02  5.00E+04 2.22E+02    1. 72E+02 10:30  02:30  1.82E+02  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1.72E+02 10:45  02:45  1.10E+02  1. OOE+02  1.00E+02    5.00E+04 2.22E+02    1.72E+02 11:00  03:00  1.10E+02  l.OOE+02  1.00E+02    5.00E+04 2.22E+02    1. 72E+02 11:15  03:15  1.10E+02  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1. 72E+02 11:30  03:30  l.10E+02  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1. 72E+02 11:45  03:45  1.10E+02  l.OOE+02  1.00E+02    5.00E+04 2.22E+02    1. 72E+02 12:00  04:00  1.10E+02  1.00E+02  1. OOE+02  5.00E+04 2.22E+02    1. 72E+02 12:15  04:15  1.10E+02  1.00E+02  1. OOE+02  5.00E+04 2.22E+02    1. 72E+02 12:30  04:30  1.10E+02  1.00E+02  1. OOE+02  5.00E+04 2.22E+02    1.72E+02 12:45  04:45  1.10E+02  1. OOE+02  1.00E+02    5.00E+04 2.22E+02    1. 72E+02 13:00  05:00  1.10E+02  1.00E+02  1. OOE+02  5.00E+04 2.22E+02    1.72E+02 13: 15 05:15  1.10E+02  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1.72E+02 13:30  05:30  1.10E+02  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1.72E+02 20:15  12:15  1.10E+02  1. OOE+02  l.OOE+02    5.00E+04 2.22E+02    1. 72E+02 20:30  12:30  1.10E+02  1. OOE+02  1.00E+02    5.00E+04 2.22E+02    1. 72E+02 20:45  12:45  1.10E+02  1. OOE+02  1.00E+02    5.00E+04 2.22E+02    1.72E+02 21:00  13:00  1.10E+02  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1.72E+02 21:15  13:15  1.10E+02  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1.72E+02 21:30  13: 30 1.10E+02  1.00E+02  1.00E+02    S.OOE+04 2.22E+02    1. 72E+02 21:45  13:45  1.10E+02  1.00E+02  1.00E+02    5.00E+04 2.22E+02    1. 72E+02 22:00  14:00  1.10E+02  1. OOE+02  1.00E+02    5.00E+04 2.22E+02    1.72E+02
* 9.2.15
 
Radiation Monitor~n~ System Salem Nuclear Generating station 06/23/93 23 S/G    24 S/G        U-2 Seal Wtr  Seal Wtr Seal Wtr Blowdn    Blowdn Chem Lab  Inj Fl tr Inj Fl tr    Fl tr Clock Drill        R19C      Rl9D      R20B    R24A      R24B      R25 Time Time          CPM        CPM      mR/hr    mR/hr    mR/hr    mR/hr 08:00 00:00  9.lOE+Ol  1.92E+02  1. OOE-01  2.00E+02  2.03E+02 2.50E+02 08:15 00:15  9.lOE+Ol  1. 92E+02 1. OOE-01  2.01E+02  2.03E+02 2.51E+02 08:30 00:30  9.lOE+Ol  1. 92E+02 1. OOE-01  2.01E+02  2.03E+02 2.51E+02 08:45 00:45  9.lOE+Ol  1. 92E+02 1. OOE-01  2.02E+02  2.03E+02 2.52E+02 09:00 01:00  9.lOE+Ol  1. 92E+02 1. OOE-01  2.02E+02  2.03E+02 2.52E+02 09:15 01:15  9.lOE+Ol  1. 92E+02 1.* OOE-01 2.03E+02  2.03E+02 2.53E+02 09:20 01:20  9.lOE+Ol  1. 92E+02 1. OOE-01  2.03E+02  2.03E+02 2.52E+02 09:25 01:25  9.lOE+Ol  1. 92E+02 1. OOE-01  2.03E+02  2.03E+02 2.52E+02 09:30 01:30  9.lOE+Ol  1. 92E+02 1. OOE-01  2.00E+02  2.03E+02 2.50E+02 09:45 01:45  9.lOE+Ol  1. 92E+02 1. OOE-01  2.00E+02  2.03E+02 2.50E+02 10:00 02:00  9*10E+Ol  l.92E+02  1. OOE-01  2.00E+02  2.03E+02 2.50E+02 10:15 02:15  *9.lOE+Ol  1. 92E+02 1. OOE-01  2.00E+02  2.03E+02 2.50E+02 10:30 02:30  9.lOE+Ol  1. 92E+02 1. OOE-01  2.00E+02  2.03E+02 2.SOE+02 10:45 02:45  9.lOE+Ol  1. 92E+02 1. OOE-01  2.00E+02  2.03E+02 2.50E+02 11:00 03:00  9.lOE+Ol  1. 92E+02 1. OOE-01  2.72E+05  2.03E+02 .2.72E+05 11:15 03:15  9.lOE+Ol  1. 92E+02 1. OOE-01  2.72E+05  2.03E+02 2.72E+05 11:30 03:30  9.lOE+Ol  1. 92E+02 1. OOE-01  2.72E+05  2.03E+02 2.72E+05 11:45 03:45  9.lOE+Ol  1.92E+02  1. OOE-01  2.72E+05  2.03E+02 2.72E+05 12:00 04:00  9.lOE+Ol  1.92E+02  1. OOE-01  2.72E+05  2.03E+02 2.72E+05 12:15 04:15  9.lOE+Ol  1.92E+02  1.00E-01  2.72E+05  2.03E+02 2.72E+05 12:30 04:30  9.lOE+Ol  l.92E+02  1. OOE-01  2.72E+05  2.03E+02 2.72E+05 12:45 04:45  9.lOE+Ol  1.92E+02  1. OOE-01  2.72E+05  2.03E+02 2.72E+05 13:00 05:00  9.lOE+Ol  1.92E+02  1.00E-01  2.72E+05  2.03E+02 2.72E+05 13: 15 05:15  9.lOE+Ol  1.92E+02  1.00E-01  2.72E+05  2.03E+02 2.72E+05 13:30 05:30  9.lOE+Ol  1. 92E+02 l.OOE-01  2.72E+05  2.03E+02 2.72E+05 20:15-12:15  9.lOE+Ol  1.92E+02  1. OOE-01  2.72E+05  2.03E+02 2.72E+05 20:30 12:30  9.lOE+Ol  1.92E+02  1. OOE-01  2.72E+05  2.03E+02 2.72E+05 20:45 12:45  9.lOE+Ol  1.92E+02  l.'OOE-01  2.72E+05  2.03E+02 2.72E+05 21:00 13:00  9.lOE+Ol  l.92E+02  1.00E-01  2.72E+05  2.03E+02 2.72E+05 21:15 13:15  9.lOE+Ol  1.92E+02  l.OOE-01  2.72E+05  2.03E+02 2.72E+05 21:30 13:30  9.lOE+Ol  1.92E+02  l.OOE-01*  2.72E+05  2.03E+02 2.72E+05 21:45 13:45  9.lOE+Ol  1.92E+02  l.OOE-01  2.72E+05  2.03E+02 2.72E+05 22:00 14:00  9.lOE+Ol  1.92E+02  l.OOE-01  2.72E+05  2.03E+02 2.72E+05 9.2.16
 
Radiation Monitorin9 System .
Salem Nuclear Generating Station 06/23/93 Rx Colnt    Liquid  Fuel Pit    Fuel Pit      Refuel Fail Fuel Fl tr Wste Fltr        Fl tr Skm Fltr  Wtr Fltr        Letdn Clock  Drill      R26        R27        R28        R29        R30      R31 Time  Time      mR/hr      mR/hr        mR/hr    mR/hr      mR/hr      CPM 08:00  00:00  8.00E+02 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 9.35E+03 08:15  00:15  8.01E+02 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 9.35E+03 08:30  00:30  8.01E+02 9.70E+OO    5.00E+Ol    1.00E+Ol  1. OOE+OO 9.35E+03 08:45  00:45  8.02E+02 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 9.34E+03 09:00  01:00  8.02E+02 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 9.34E+03 09:15  01:15  8.03E+02 9.70E+OO    5.00E+Ol    1. OOE+Ol 1 .. OOE+OO 9.34E+03 09:20  01:20  8.03E+02 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 9.34E+03 09:25  01:25  8.03E+02 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 9.34E+03 09:30  01:30  8.00E+02 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 9.34E+03 09:45  01:45  8.00E+02 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 9.34E+03 10:00  02:00  8.00E+02 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 9.34E+03 10:15  02:15  8.00E+02 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 9.34E+03 10:30  02:30  8.00E+02 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 9.34E+03 10:45  02:45  8.00E+02 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 9.34E+03 11:00  03:00  2.72E+05 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 7.04E+05 11:15  03: 15 2.72E+05 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 7.04E+05 11:30  03:30  2.72E+05 9.70E+OO    5.00E+01    1. OOE+Ol 1. OOE+OO 7.04E+05 11:45  03:45  2.72E+05 9.70E+OO    5.00E+Ol    1. OOE+01 1. OOE+OO 7.04E+05 12:00  04:00  2.72E+05 9.70E+OO    5.00E+01    1. OOE+Ol 1. OOE+OO 7.04E+05 12:15  04:15  2.72E+05 9.70E+OO    5.00E+Ol    1.00E+Ol  1. OOE+OO 7.04E+05 12:30  04:30  2.72E+05 9.70E+OO    5.00E+Ol    1.00E+Ol  1. OOE+OO 7.04E+05
* 12:45  04:45  2.72E+05 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 7.04E+05 13:00  05:00  2.72E+05 9.70E+OO    5.00E+01    1. OOE+01 1. OOE+OO 7.04E+05 13:15  05:15  2.72E+05 9.70E+OO    5.00E+Ol    1.00E+Ol  1. OOE+OO 7.04E+05 13: 30 05:30  2.72E+05 9.70E+OO    5.00E+Ol    1.00E+Ol  1. OOE+OO 7.04E+05 20:15  12:15  2.72E+05 9.70E+OO    5.00E+01    1. OOE+Ol 1. OOE+OO 7.04E+05 20:30  12:30  2.72E+05 9.70E+OO    5.00E+Ol    1.00E+Ol  1. OOE+OO 7.04E+OS 20:45  12:45  2.72E+05 9.70E+OO    5.00E+01    1.00E+Ol  1. OOE+OO 7.04E+05 21:00  13:00  2.72E+05 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 7.04E+05 21:15  13:15  2.72E+05 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 7.04E+05 21:30  13:30  2.72E+05 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 7.04E+05 21:45  13:45  2.72E+05 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 7.04E+05 22:00  14:00  2.72E+05 9.70E+OO    5.00E+Ol    1. OOE+Ol 1. OOE+OO 7.04E+05
* 9.2.17
 
Radiation Monitorin~ System Salem Nuclear Generating Station 06/23/93 Fuel          IX        Mech S/G Bldn      Evap Fd    Non Rad crane        Fl tr        Pen Fl tr Dsch Prht end          Wst Clock Drill          R32A        R33          R34        R35        R36        R37 Time  Time          mR/hr      mR/hr      mR/hr        CPM        CPM        CPM 08:00 00:00      1. OOE-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 08:15 00:15      1. OOE-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 08:30 00:30      1. OOE-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 08:45 00:45      1.00E-01 1.75E+02 2.70E-Ol              N/A    4.00E+02 4.00E+02 09:00 01:00      l.OOE-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 . 4. OOE+02 09:15 01:15      1.00E-01 1. 75E+02 2.70E-Ol            N/A    4. OOE+02. 4.00E+02 09:20 01: 20. 1.00E-01 1.75E+02 2.70E-Ol              N/A    4.00E+02 4.00E+02 09:25 01:25      1. OOE-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 09!30 01:30      1. OOE-01 1.75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 09:45 01:45      1. OOE-01 1. 75E+02 2.70E-01            N/A    4.00E+02 4.00E+02 10:00 02:00      1. OOE-01 1. 75E+02 2.70E-01            N/A    4.00E+02 4.00E+02 10:15 02:15      1. OOE-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 10:30 02:30      1. OOE-01 .l.75E+02
* 2. 70E-Ol        N/A
* 4. OOE+02 4.00E+02 10:45 02:45  . 1. OOE-01 L 75E+02 2.70E-Ol              N/A    4.00E+02 4.00E+02 11:00 03:00      1. OOE-01 1. 75E+02 2.70E-01            N/A    4.00E+02 4.00E+02 11:15 03:15    . 1. OOE-01 1. 75E+02    2.70E-01        N/A    4.00E+02 4.00E+02 11:30 03:30      1.00E-01 1. 75E+02 2. 70E-01*          N/A    4.00E+02 4.00E+02 11:45 03:45      1. OOE-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 12:00 04:00      1. OOE-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 12:15 04:15      1.00E-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 12:30 04:30      1. OOE-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 12:45 04:45      1. OOE-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 13:00 05:00      1. OOE-01 1.75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 13:15 05:15      1.00E-01 l.75E+02 2.70E-Ol              N/A    4.00E+02 4.00E+02 13:30 05:30      1. OOE-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 20:15 12:15      1. OOE-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 20:30 12:30      l.OOE-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 20:45 12:45      1.00E-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 21:00 13:00      1. OOE-01 1.75E+02      2.70E-Ol        N/A    4.00E+02 4.00E+02 21:15 13:15      1. OOE-01 . 1. 75E+02  2.70E-Ol        N/A    4.00E+02 4.00E+02 21:30 13:30      1. OOE-01 1. 75E+02 2.70E-Ol            N/A    4.00E+02 4.00E+02 21:45 13:45      1. OOE-01 1. 75E+02    2.70E-Ol        N/A    4.00E+02 4.00E+02 22:00 14:00      l.OOE-01 l.75E+02 2.70E-Ol              N/A    4.00E+02 4.00E+02 9.2.18
 
Radiation Monitorin~ System Salem Nuclear Generating Station 06/23/93 S/G Bldn  Condnste Plnt Vnt    Plnt Vnt  Plnt Vnt    21 Wste Fl tr      Fl tr      Part    Iodine  Nbl Gas  Gas Tnk Clock Drill      R38        R40        R41A      R41B      R41C      R42A Time  Time      mR/hr      mR/hr        CPM      CPM        CPM    mR/hr 08:00 00:00    N/A    1. 50E-Ol 3.00E+Ol    3.70E+Ol  5.00E+Ol  5.62E+OO 08:15 00:15    N/A    l.50E-Ol 3.00E+Ol    3.SOE+Ol  5.00E+Ol  5.62E+OO 08:30 00:30    N/A    1. 50E-Ol 3.00E+Ol    3.90E+Ol  5.00E+Ol  5.62E+OO 08:45 00:45    N/A    1. 50E-Ol 3.00E+Ol    4.00E+Ol  5.00E+Ol  5.62E+OO 09:00 01:00    N/A    1. 50E-Ol 3.00E+Ol    4.lOE+Ol  5.00E+Ol  5.62E+OO 09:15 01:15    N/A    1. 50E-Ol 3.00E+Ol    4.20E+Ol  5.00E+Ol  5.62E+OO 09:20 01:20    N/A    1. 50E-Ol 3.00E+Ol    4.30E+Ol  2*. 34E+04 5.65E+OO 09:25 01:25    N/A    1. 50E-Ol 3.00E+Ol    4.40E+Ol  l.42E+05  5.62E+OO 09:30 01:30    N/A    1.50E-Ol 3.00E+Ol    4.50E+Ol  2.SOE+05  6.62E+OO 09:45 01:45    N/A    1. 50E-Ol 3.28E+Ol    4.60E+Ol  1. 91E+05  6.62E+OO 10:00 02:00    N/A    1. 50E-Ol 3. 06E+O*l  4.70E+Ol  4.27E+04  6.62E+OO 10:15 02:15    N/A    1.SOE-01 3.0lE+Ol    4.SOE+Ol  9.08E+03  5.62E+OO 10:30 02:30    N/A    1. SOE-01 3.02E+Ol    4.90E+Ol  8.33E+02  5.62E+OO 10:45 02:45    N/A    1. 50E-Ol 3.19E+Ol    5.00E+Ol  5.19E+Ol  5.62E+OO 11:00 03:00    N/A    l.50E-Ol ,3.lSE+Ol    5.lOE+Ol  5.lSE+Ol  5.62E+OO 11:15 03:15    N/A    1.SOE-01 3.lSE+Ol    5.20E+Ol  5.lSE+Ol  5.62E+OO 11:30 03:30    N/A    1. 50E-Ol 3.17E+Ol    5.JOE+Ol  5.18E+Ol  5.62E+OO 11:45 03:45    N/A    l.50E-Ol 3.17E+Ol    5.40E+Ol  5.17E+Ol  5.62E+OO 12:00 04:00    N/A    1. 50E-Ol 3.17E+Ol    5.SOE+Ol  5.17E+Ol  5.62E+OO 12:15 04:15    N/A    1. SOE-01 3.17E+Ol    5.60E+Ol  5.17E+Ol  5.62E+OO 12:30 04:30    N/A    1.SOE-01 3.16E+01    5.SOE+Ol  5.16E+Ol  5.62E+OO 12:45 04:45    N/A    1.SOE-01 3.16E+Ol    5.90E+Ol  5.16E+Ol  5.62E+OO 13:00 05:00    N/A    l.SOE-01 3.16E+Ol    6.00E+Ol  5.16E+Ol  5.62E+OO 13:15 05: 15    N/A    l.SOE-01 3.16E+Ol    6.lOE+Ol  5.16E+Ol  5.62E+OO 13:30 05:30    N/A    1. 50E-Ol 3.16E+Ol    6.20E+Ol  5.16E+Ol  5.62E+OO 20:15 12:15    N/A    l.50E-Ol ~_. lJE+Ol  6.SOE+Ol  5.13E+Ol  5.62E+OO 20:30 12:30    N/A    l.SOE-01 3 ;*lJE+Ol  6.90E+Ol  5.lJE+Ol  5.62E+OO 20:45 12:45    N/A    l.SOE-01 3.lJE+Ol    7.00E+Ol  5.lJE+Ol  5.62E+OO 21:00 13:00    N/A    1. SOE-01 3.13E+Ol    7.lOE+Ol  5.lJE+Ol  5.62E+OO 21:15 13:15    N/A    l.50E-Ol 3.13E+Ol    7.20E+Ol  5.lJE+Ol  5.62E+OO 21:30 13: 30    N/A    l.50E-Ol J.13E+Ol    7.JOE+Ol  5.lJE+Ol  5.62E+OO 21:45 13:45    N/A    1. 50E-Ol J.13E+Ol    7.40E+Ol  5.13E+Ol  5.62E+OO 22:00 14:00    N/A    1.50E-Ol J.13E+Ol    7.50E+Ol  5.lJE+Ol  5.62E+OO
* 9.2.19
 
Radiation Monitorin9 System Salem Nuclear Generating Station 06/23/93 22 Wste    23 Wste
* 24 wste        ELECT  Hgh Rng  Hgh Rng Gas Tnk    Gas Tnk    Gas Tnk        PEN  Incntmt  Incntmt Clock Drill        R42B        R42C      R42D      R47      R44A      R44B Time  Time        mR/hr        mR/hr      mR/hr    mR/hr      R/HR      R/HR 08:00 00:00  5.50E+OO 5.25E+OO LSOE+OO        1. 01E+OO 1.00E+OO  1. OOE+OO 08:15 00: 15' 5.50E+OO 5.25E+OO 1.SOE+OO        l.01E+OO  1.00E+OO  1.00E+OO 08:30 00:30  5.50E+OO 5.25E+OO 1. 50E+OO      1. OlE+OO 1. OOE+OO l.OOE+OO 08:45 00:45  5.50E+OO 5.25E+OO 1.50E+OO        1. OlE+OO 1. OOE+OO 1. OOE+OO 09:00 01:00  5.50E+OO 5.25E+OO 1.50E+OO        1. OlE+OO 1. OOE+OO l.OOE+OO 09:15 01:15  5.50E+OO 5.25E+OO l.50E+OO        1. OlE+OO 1. OOE+OO l.OOE+OO 09:20 01:20  5 .50E+OO
* 5.25E+OO l.50E+OO    1. OlE+OO l.OOE+OO  l.OOE+OO 09:25 01:25  5.50E+OO 5.25E+OO l.50E+OO        1. OlE+OO 1. OOE+OO l.OOE+OO 09:30 01:30  5.60E+OO 5.35E+OO 1. 60E+OO      1. OlE+OO LOOE+OO  l.OOE+OO 09:45 01:45  5.60E+OO 5.35E+OO 1. 60E+OO      l.01E+OO  1. OOE+OO l.OOE+OO 10:00 02:00  5.60E+OO 5.35E+OO 1. 60E+OO      l.OlE+OO  1. OOE+OO 1. OOE+OO 10:15 02:15  5.50E+OO 5.25E+OO l.50E+OO        1. OlE+OO 1. OOE+OO 1.00E+OO 10:30 02:30  5.50E+OO 5.25E+OO l.50E+OO        2.14E+OO  1. OOE+OO l.OOE+OO 10:45 02:45  5.50E+OO 5.25E+OO 1. 50E+OO      2.19E+OO  1. OOE+OO 1. OOE+OO 11:00 03:00  5.50E+OO 5.25E+OO 1.50E+OO        2.14E+OO  1. OOE+OO 1. OOE+OO 11:15 03:15  5.50E+OO 5.25E+OO l.50E+OO        2.lOE+OO  1. OOE+OO l.OOE+OO 11:30 03:30  5.50E+OO 5.25E+OO l.50E+OO        2.06E+OO  1. OOE+OO 1.00E+OO 11:45 03:45  5.50E+OO 5.25E+OO l.50E+OO        2.03E+OO  1. OOE+OO l.OOE+OO 12:00 04:00  5.50E+OO 5.25E+OO l.50E+OO        2.00E+OO  1. OOE+OO l.OOE+OO 12:15 04:15  5.SOE+OO 5.25E+OO l.SOE+OO        l.98E+OO  1. OOE+OO 1.00E+OO 12:30 04:30  5.50E+OO 5.25E+OO l.SOE+OO        l.95E+OO  1. OOE+OO l.OOE+OO 12:45 04:45  5.SOE+OO 5.25E+OO 1.SOE+OO        1.93E+OO  1. OOE+OO 1. OOE+OO 13:00 05:00  5.SOE+OO 5.25E+OO l.SOE+OO        l.91E+OO  1. OOE+OO 1.00E+OO 13:15 05:15  5.SOE+OO 5.25E+OO l.SOE+OO        l.89E+OO  l.OOE+OO  1.00E+OO 13:30 05:30  5.SOE+OO 5.25E+OO l.SOE+OO        l.87E+OO  1. OOE+OO 1. OOE+OO 20:15 12:15  5.SOE+OO 5.2SE+OO 1.SOE+OO        l.60E+OO  1. OOE+OO 1. OOE+OO 20:30 12:30  5.SOE+OO 5.25E+OO l.SOE+OO        l.59E+oo. 1. OOE+OO 1.00E+OO 20:45 12:45  5.50E+OO 5.25E+OO 1.50E+OO        l.58E+OO  1.00E+OO  l.OOE+OO 21:00 13:00  5.50E+OO 5.25E+OO l.50E+OO        l.58E+OO  1. OOE+OO l.OOE+OO 21:15 13:15  5.50E+OO 5.25E+OO l.SOE+OO        l.57E+OO  1. OOE+OO l.OOE+OO 21:30 13:30  5.SOE+OO 5.25E+OO l.SOE+OO        l.56E+OO  1. OOE+OO l.OOE+OO 21:45 13:45  5.50E+OO 5.25E+OO l.50E+OO        l.56E+OO  1.00E+OO  1.00E+OO 22:00 14:00  5.50E+OO 5.25E+OO l.SOE+OO        l.55E+OO  1. OOE+OO l.OOE+OO
                            /
9.2.20
* Clock Drill Plnt Vnt Nbl Gas R45A Radiation Monitorin~ System .
Salem Nuclear Generating Station NG Mid R45B 06/23/93 Plnt Vnt Plnt Vnt NG Hgh R45C Plnt Vnt Fltr Mon R45D 22 Main Stm Line R46A 24 Main Stm Line R46B Time  Time        CPM    UCI/CC      UCI/CC      CPM      mR/hr    mR/hr 08:00 00:00 1. OOE+OO  1. OOE-03  1. OOE-01  5.00E+Ol 1. OOE+OO  l.OOE+OO 08:15 00:15 1. OOE+OO  l.OOE-03 1. OOE-01    5.00E+Ol 1. OOE+OO  l.OOE+OO 08:30 00:30 1. OOE+OO  1. OOE-03  1. OOE-01  5.00E+Ol 1. OOE+OO  1. OOE+OO 08:45 00:45 l.OOE+OO  1.00E-03 1. OOE-01    5.00E+Ol 1. OOE+OO  l.OOE+OO 09:00 01:00 1. OOE+OO  1. OOE-03 1. OOE-01    5.00E+Ol 1. OOE+OO  1. OOE+OO 09:15 01:15 l.OOE+OO  1.00E-03 :l.OOE-01    5.00E+Ol :1. OOE+OO 1. OOE+OO 09:20 01:20 l.OOE+OO  1. OOE-03 1. OOE-01    5.00E+Ol 1. OOE+OO  1.00E+OO 09:25 01:25 l.OOE+OO  1. OOE-03  1. OOE-01  5.00E+Ol 1. OOE+OO  1. OOE+OO 09:30 01:30 1.00E+OO  1. OOE-03 1. OOE-01    5.00E+Ol 1. OOE+OO  l.OOE+OO 09:45 01:45 l.OOE+OO  1. OOE-03 1. OOE-01    5.00E+Ol 1. OOE+OO  1.00E+OO 10:00 02:00 1. OOE+OO  1. OOE-03 1. OOE-01    5.00E+Ol 1. OOE+OO  1. OOE+OO 10:15 02:15 l.OOE+OO  1. OOE-03 1. OOE":"Ol  5.00E+Ol 1. OOE+OO  1. OOE+OO 10:30 02:30 1.00E+OO  1. OOE-03 1. OOE-01    5.00E+Ol 1. OOE+OO  1. OOE+OO 10:45 02:45 1. OOE+OO  1. OOE-03 1. OOE-01    5.00E+Ol 1. OOE+OO  1. OOE+OO 11:00 03:00 1. OOE+OO  1. OOE-03 1. OOE-01    5.00E+Ol 1. OOE+OO  1. OOE+OO 11:15 03:15 1.00E+OO  1.00E-03 1.00E-01      5.00E+Ol 1. OOE+OO  1. OOE+OO 11:30 03:30 1. OOE+OO  1.00E-03 1.00E-01      5.00E+Ol 1. OOE+OO  1. OOE+OO 11:45 03:45 1. OOE+OO  l.OOE-03 1.00E-01      5.00E+Ol l.OOE+OO  l.OOE+OO 12:00 04:00 1. OOE+OO  1. OOE-03 1. OOE-01    5.00E+Ol 1. OOE+OO  1. OOE+OO 12:15 04:15 l.OOE+OO  l.OOE-03 1.00E-01      5.00E+Ol 1.00E+OO  1. OOE+OO 12:30 04:30 l.OOE+OO  1.00E-03 1.00E-01      5.00E+Ol 1. OOE+OO  1.00E+OO 12:45 04:45 l.OOE+OO  1. OOE-03 1. OOE-01    5.00E+Ol 1. OOE+OO  1. OOE+OO 13:00 05:00 l.OOE+OO  l.OOE-03 1.00E-01      5.00E+Ol 1. OOE+OO  l.OOE+OO 13:15 05:15 1.00E+OO  1.00E-03 1. OOE-01    5.00E+Ol 1. OOE+OO  1.00E+OO 13:30 05:30 l.OOE+OO  l.OOE-03 1.00E-01      5.00E+Ol 1. OOE+OO  1.00E+OO 20:15 12:15 1. OOE+OO  1. OOE-03 1. OOE-01    5.00E+Ol 1. OOE+OO  1.00E+OO 20:30 12:30 1. OOE+OO  1.00E-03 l.OOE-01      5.00E+Ol 1. OOE+OO  1.00E+OO 20:45 12:45 1.00E+OO  1.00E-03 l.OOE-01      5.00E+Ol 1.00E+OO  1.00E+OO 21:00 13:00 l.OOE+OO  l.OOE-03 1.00E-01      5.00E+Ol 1.00E+OO  l.OOE+OO 21:15 13:15 1.00E+OO  1.00E-03 1.00E-01      5.00E+Ol 1. OOE+OO  1.00E+OO 21:30 13:30 1.00E+OO  1.00E-03 *1.00E-01    5.00E+Ol 1. OOE+OO  1. OOE+OO 21:45 13:45 1.00E+OO  1. OOE-03  1. OOE-01  5.00E+Ol 1. OOE+OO  1.00E+OO 22:00 14:00 1.00E+OO  1.00E-03 1. OOE-01    5.00E+Ol 1. OOE+OO  1. OOE+OO
* 9.2.21
 
Clock Drill 21 Main Radiation Monitorin~ System Salem Nuclear Generating Station 23 Main Stm Line stm Line R46C        R46D 06/23/93 R46E Vnt Emer Mntr R43 PASS RM LOCAL R52 Time Time        mR/hr      mR/hr      mR/hr      mR/hr        R/HR 08:00 00:00  1. OOE+OO 1. OOE+OO 1. OOE+OO    1. OOE-01
* 1. OOE-01 08:15 00:15  1. OOE+OO 1.00E+OO l.OOE+OO      1. OOE-01 1. OOE-01 08:30 00:30  1. OOE+OO l.OOE+OO l.OOE+OO      1. OOE-01 1. OOE-01 08:45 00:45  1. OOE+OO 1.00E+OO 1.00E+OO      1. OOE-01 1. OOE-01 09:00 01:00  1. OOE+OO 1. OOE+OO 1. OOE+OO    1. OOE-01 1. OOE-01 09:15 01:15  1.00E+OO 1. OOE+OO 1. OOE+OO      1. OOE-01 .1. OOE-01 09:20 01:20  1.00E+OO 1. OOE+OO 1.00E+OO      1. 30E-Ol  1. OOE-01 09:25 01:25  .1.00E+OO 1.00E+OO 1.00E+OO        1.40E-Ol 1. OOE-01 09:30 01:30  l.OOE+OO l.OOE+OO *1. OOE+OO      1. 60E-Ol  1. OOE-01 09:45 01:45  1. OOE+OO 1.00E+OO 1.00E+OO      1. 40E-Ol  1. OOE-01 10:00 02:00  l.OOE+OO 1.00E+OO 1.00E+OO        1. OOE-01  1. OOE-01 10:15 02:15  1.00E+OO 1. OOE+OO 1.00E+OO      1. OOE-01  1. OOE-01 10:30 02:30  1. OOE+OO 1. OOE+OO 1. OOE+OO    1. OOE-01 1. OOE-01 10:45 02:45  1. OOE+OO . 1. OOE+OO 1. OOE+OO  1. OOE-01  1. OOE-01 11:00 03:00  1. OOE+OO 1. OOE+OO l.OOE+OO      1. OOE-01  l.OOE-01 11:15 03:15  l.OOE+OO 1. OOE+OO 1.00E+OO      1. OOE-01  1. OOE-01 11:30 03:30  1. OOE+OO  1. OOE+OO  1.00E+OO  1. OOE-01  1. OOE-01 11:45 03:45  1.00E+OO 1. OOE+OO 1.00E+OO      1. OOE-01  1. OOE-01 12:00 04:00  1.00E+OO 1. OOE+OO 1.00E+OO      1. OOE-01  1. OOE-01 12:15 04:15  1.00E+OO 1 *. ooE+oo* 1.00E+OO    1. OOE-01 1. OOE-01 12:30 04:30  1.00E+OO 1.00E+OO 1. OOE+OO      1. OOE-01  1. OOE-01 12:45 04:45  .1. OOE+OO  1. OOE+OO  1.00E+OO  1. OOE-01  1. OOE-01 13:00 05:00  1.00E+OO 1. OOE+OO 1.00E+OO      1. OOE-01  1.00E-01 13:15 05:15  1.00E+OO 1.00E+OO l~OOE+OO        1. OOE-01 1. OOE-01
* 13:30 05:30. l.OOE+OO 1. OOE+OO 1.00E+OO      1. OOE-01  1. OOE-01 20:15-12:15  1. OOE+OO 1;00E+OO 1.00E+OO      i.OOE-01 1. OOE-01 20:30 12:30  l.OOE+OO 1. OOE+OO 1. OOE+OO      1. OOE-01  1. OOE-01 20:45 12:45  1.00E+OO l.OOE+OO 1.00E+OO        1. OOE-01 1.00E-01 21:00 13:00  l.OOE+OO 1.00E+OO 1.00E+OO        1. OOE-01  1. OOE-01 21:15 13:15  l.OOE+OO l.OOE+OO l.OOE+OO        1. OOE-01  1. OOE-01 21:30 13:30  1.00E+OO 1.00E+OO 1.00E+OO        1. OOE-01  1. OOE-01 21:45 13:45  l.OOE+OO 1. OOE+OO 1.00E+OO      1. OOE-01  1. OOE-01 22:00 14:00  1.00E+OO 1.00E+OO 1.00E+OO        1. OOE-01 1. OOE-01 9.2.22                            *
* I I
DATE OF DRILL:  JUNE 23, 1993  D    DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
DRILL TIME(S) : 0000 - END      6    NEUTRON DOSE RATES IN MR/HR REAL TIME(S) : 0800 -  END      AIR SAMPLE DATA : SEE CONTAINMENT ATMOSPHERE CONTAMINATION LEVELS: 1500 ccpm DATA 9.3.1
 
      .~
UNIT TWO 2R7 CONTAINMEl'A 111 L-100' E'W'
  # 22 IODINE REMOVAL"-
UNIT I
i I~\~:
rim  11---i l' e  J
(#21\
I I r !rJ~ \ j
                        'GENERATORi    ,          ,
                                                            !rJ~ , \
GENERATOR)    1 2R44B
                          '~
I r/\1~1\
u
                    ;
I
                    \
                    \,)                              '@      # 2 PZR
                                                                                    # 21 OJ                                                  IODINE
                                                                          --REMOVAL OJ                                  UNIT DATE OF DRILL:    JUNE 23, 1993          D    DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
DRILL TIME(S) : 0000 -  END            6_  NEUTRON DOSE RATES IN MR/HR REAL TIME(S) : 0800 -  END              AIR SAMPLE DATA : SEE CONTAINMENT ATMOSPHERE CONTAMINATION LEVELS: N/A DATA                *
      ----------                                                                    9.3.2
 
UNIT TWO
* CONTAINMENT 78' EL REGEN  EXCESS HX  LETDOWN HX DATE OF DRILL:  JUNE 23, 1993      D    DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
DRILL TIME(S) : 0000 -  END 6_  NEUTRON DOSE RATES IN MR/HR REAL TIME(S) : 0800 -  END          AIR SAMPLE DATA : SEE CONTAINMENT
* CONTAMINATION LEVELS: N/A ATMOSPHERE DATA 9.3.3
 
2R1B*                                                        UNIT TWO D                        @]            # 2 D
I  I          CCJTROL ROOM                        AUX BUILDI1'r.a D
                                        ..'...IR C:NDITIONING                                    122' E~
UNIT 2R41A
                                  ,-B
                                  *,-C
                                        .A.UX.
#                                  :?UILDING
      -1..-.W-1-=-1-!:t--::::~=r SUPPLY FANS f<il I
COM-PON ENT G 111 ~ ~ @]
  , --~L..'.J~------1                COOLING SURGE TANK RADIOLOGICAL INFORMATION I
DATE OF DRILL:  -1UNE 23: 1993 DRILL TIME(S) : 0000 -  0119 REAL TIME(S) : 0800 -  0919 VOLUME        AIR SAMPLE DATA : SEE GENERAL AREA CONTROL                            AUX BUILDING AIR DA1.
TANK AMS READING:    400 CCPM 0    AMS (CONTINUOUS AIR MONITOR)
                                                    *CONTAMINATION LEVELS: N/A BORIC ACID TANKS D    DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
\C\      \              ------- BORIC ACID BORIC ACID          BATCH TANK FILL TANK STEAM GENERATOR SLOWDOWN TANK
              .A    NOHU1Ii!i 9.3.4
 
2R!B*                                                        UNIT TWO\
* D D
D
[2J ..
i r--------'.
                            ~
Q]
                            -r-----11-_
H2 CONTROL ~QOM
                                                      .~iR CCNDITIONING 2R41A
                                              ~B Ul'JIT AUX BUILDING 122' EL 1.-c
                                      ...__----'!    AUX 3UILDING
__J__i-+J~-+/-t--:::i::::::==jf SUPPLY FANS RADIOLOGICAL INFORMATION AUX
                                                  '3UILDING DATE OF DRILL:  JUNE 23, 1993 EXHAUST FANS DRILL TIME(S) : 0120 -  0245 REAL TIME(S) : 0920 -  1045
* VOLUME CONTROL TAN~
AIR SAMPLE DATA : SEE GENERAL AREA AMS READING:
AUX BUILDING AIR DATA OFFSCALE HIGH ALARMING!
0      AMS (CONTINUOUS AIR MONITOR)
CONTAMINATION LEVELS: N/A BORIC ACID TANKS D    DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
                                - - - - - - - BORIC ACID
            \      BORIC ACID                BATCH TANK FILL TANK STEAM GENERATOR SLOWDOWN TANK
* 9.3.5
 
2R!B*                                                            UNIT TWO D                                          #    2 D              I  I G.2J        ~~NTROL ROOM                        AUX      BUILDI~
                                            .:..IR D                                  C~NDITIONING                            .      122'.
UNIT 2R41A B
_ _.. ,-c AUX
:3UILDING
_j__W.~-tr-::::!:::::::=f" SU PPLY FANS COMPONENT COOLING G                                  SURGE TANK AUX RADIOLOGICAL INFORMATION C:UILOING    '.)A.TE CF DRILL:  jUNE 23. 1993
::::XHAUST FANS DRILL J:l.,1E(S) : 0246 -  END REAL TIME(S) : 1046 -      END VOLUME    AIR SAMPLE DATA : SEE GENERAL AREA CONTROL                            AUX BUILDING AIR D TANK AMS READING:      400 CCPM 0        AMS (CONTINUOUS AIR MONITOR)
CONTAMINATION LEVELS: N/A BORIC ACID TANKS D        DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
        \              - - - - - - - BORIC ACID BORIC ACID              BATCH TANK FILL TANK E2J  STEAM GENERATOR SLOWDOWN TANK 9.3.6
 
UNIT TWO AUX BUILDING 100' EL EJJ    I 1--------
2R52 L.
EJJ
[[]
I DJ RADIOLOGICAL INFORMATION DATE OF DRILL:    JUNE 23, 1993 DRILL TIME(S) : 0000 -  0229 REAL TIME(S) : 0800 -  1 029 AIR SAMPLE DATA : SEE GENERAL AREA E}J                    AUX BUILDING AIR DATA AMS READING:    400 CCPM
* WASTE~
EVAP.
UNIT 2R28
              =        2R33 0    AMS (CONTINUOUS AIR MONITOR)
CONTAMINATION LEVELS: N/A D    .DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
0        E]      0    E]
0              0 0
0        ~                            g]
0 0
[QJ 0
10
[Q]    []]
c:+:J ~
g]
                                          .l
*              )BORIC ACID' TRANSFER PUMPS    ...A  Nilmm 9.3.7
 
BORIC ACID                                            UNIT TWO EVAP.
AUX BUILDIN
* 100' EL 1-----..
2R52 Le
        ~
Isool
                        ~
Isooj RADIOLOGICAL INFORMATION DATE OF DRILL:  JUNE 23, 1993 DRILL TIME(S) : 0230 -  END REAL TIME(S) : 1030 -  END AIR SAMPLE DATA : SEE GENERAL AREA AUX BUILDING AIR DATA AMS READING:    400 CCPM WASTE~                                0      AMS (CONTINUOUS AIR MONITOR)
EVAP.
UNIT                                CONTAMINATION LEVELS: N/A
          =
2R28      2R33 D    DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
0 0
0 0
0 0
0 ll*[Q]*o*~rn~----g]*1
    !O    ~~
Cc1Cill\
TRANSFER
                            .t.
PUMPS 9.3.7.a
 
_l\UX BUILDING ENTRANCE HALL\\TAY AT PSCP 100' EL e 1R23
                          /./ts!J AUX BUILDING ENTRANCE COUNT ROOM RADIOLOGICAL INFORMATION DATE OF DRILL:    JUNE 23, 1993
* DRILL TIME(S) : 0000 -  END REAL TIME(S) : 0800 -  END AMS    LOCATION AMS READING:    400 CCPM AIR SAMPLE DATA : 2E-12 uCi/cc (Gross)
CONTAMINATION LEVELS: N/A
* D      DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
9.3.8
 
UNIT ONE *
        ~t\UX    BUILDING, CHEMISTRY LAri.
                                            . 100' E 1R3 D
                  . _**~*
RADIOLOGICAL INFORMATION DATE OF DRILL:  JUNE 23, 1993 DRILL TIME(S) : 0000. -    END REAL TIME(S) : 0800 -      END AIR SAMPLE DATA : 2.1E-12 uCi/cc (GROSS)
AMS READING 0000-END 400 CCPM CONTAMINATION LEVELS: N/A D    DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
9.3.9
 
UNIT ONE
* AUX BUILDING, PRIMARY SAMPLE ROOM 113' EL I        /LJLJL_J      1R6A
[ill 0 1
[;]JI I I I I I I I I I I I I lr:;JJ                [;]]                        U/1 mm
                                                -~                              SAMPLE VALVE Ii    I    II PANEL I U/2
                                                            /SAMPLE VALVE PANEL RADIOLOGICAL INFORMATION
* DATE OF DRILL:        JUNE 23, 1993 DRILL TIME(S) : 0000 -
REAL TIME(S) : 0800 -
0229 1029 AIR SAMPLE DATA : SEE GENERAL AREA AUX BUILDING AIR DATA AMS READING: 400 CCPM 0    AMS (CONTINUOUS AIR MONITOR)
CONTAMINATION LEVELS: N/A D      DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED .
* 9.3.10
 
UNIT ONE AUX BUILDING, p*RIMARY SAMPLE ROO~*
113' EL LJ                                          LJ LJ LJ      LJ        1R6A
[gfil 0 ITJ 250
                                          ~                            U/1 SAMPLE
                                        . ~
VALVE PANEL 11        11 I U/2
                                                /SAMPLE VALVE PANEL RADIOLOGICAL INFORMATION DATE OF DRILL:    JUNE 23, 1993 DRILL TIME(S) : 0230 ~ END REAL TIME(S) : 1030 -    END AIR SAMPLE DATA : SEE GENERAL AREA AUX BUILDING AIR DATA AMS READING: OFFSCALE HIGH ALARMING!
@    AMS (CONTINUO.US AIR MONITOR)
CONTAMINATION LEVELS: N/A D      DOSE RATES IN MR/HR UNLESS
      . OTHERWISE INDICATED.
9.3.1 O.a
 
S:?ENT FUEL      HX UNIT TWO I
      ~PENT
::-IJEL                      w 2R36                                AUX BUILDING
:                                                EL CJ!T
:::UMPS                                                                                    84' 111 ! I"    IUP    [5J]
ill 22 SJ    I I 21  SJ  11
                                  ~
                      ~        21  CC HX          ~
cc      e2Rl 7A LI,, 2 Rl 7 B.
PPS RADIOLOGICAL INFORMATION
                                                        ~
AUX
                      ~        22  cc  HX
                                                                  !)ATE OF DRILL:  ~UNE 22. 1993 FEED PPS                                                DRILL TIME(S) : 0000 -  E:ND LJ~                                                                  i I
REAL TIME(S) : 0800 -  END              I 2R31 ID
                                            *~                  AIR SAMPLE DATA : SEE GENERAL AREA
* 2R25 2R24B
                                                        ~
AMS READING: 400 CCPM AUX BUILDING AIR DATA CONTINUOUS AIR MONITOR (AMS)
CONTAMINATION LEVELS: N/A 2R25A                                                          :---1 DOSE r<ATES IN MR/HR UNLESS LJ      OTHERWISE INDICATED.
                ~
OJ                      ~
2l ce 1 CTMT 2R4              2f~e I                                SPRAY PUMPS W,,l I 23 CPI
                ~
2R18 SPRAY ADDIT.
TANK
                                                ~
REFUEL.
WATER
                                                    ~
PURIF.
* SPENT RESIN/
STORAGE TANK WASTE j/
MONITOR TNKS & PMPS PRIMARY WATER MAKE-UP PUMPS PUMP
                                                                  .d.. NQP!Ultii 9.3.11
 
UNIT TWO AUX BUILDINA
                                                                                                .        64' ~
                                                    !_Dl RADIOLOGICAL li*JFORMATION R1i      :)ATE OF DRILL:    JUNE 23. 1993
[]]
                                    ~~
CJ    I eves \ 1 eves MONITOR ) \MONITOR /
TANK    -~/        I            JRILL TIME(S) : 'JOOO -
                                                                          ~EAL TIME(S) :  0800 -
END END 1*21
                                  '.JASTE                              AIR SAMPLE DATA : SEE GENERAL AREA
                                                              . **;.*
AUX BUILDING AIR DATA HOLD-UP TANK              []J
* SEE LEAK LOCATION
                                      .25]
ATMOSPHERE CONCENTRATIONS lf22 0
AMS READINGS: 400CCPM
                                  \./ASTE
          ~21
    .JASTE GAS            HOLD-UP TANK                                0    AMS    CCONTINUOUS AIR MONITOR)
C:;JMPRESSOR                      l3ITI          2R27
* CONTAMINATION LEVELS: N/A PACK tt2            Q] Kl]
lt22
    ".JASTE GAS COMPRESSOR PACK
                          \/ASTE MONITOR HOLD-UP TANK
                              ~
                                      !IQ]
Kl1 0
ASTERISK ( *) AREAS WILL HAVE THE FOLLOWING DOSE RATES DRILL TIME REAL TIME
                                                                                          ~PEN
                                                                                          \JINDO\J CLOSED W'lNDO\J
                                              ~@
0120    0920  5.60  R/HR    4.50 R/HR 2R42A        '~                                                        0130    0930  6.25  R/HR    5.00 R/HR 1
2R42B~
2R42C, .,_
                , ~-----                                                  0145 0200 0945 1000 6.00 5.60 R/HR R/HR 4.80 R/HR 4.50 R/HR 2~42D *\''~
625  MR/HR    500 MR/HR
[TI          0215 0230 1015 1030    62.5  MR/HR  50.0 MR/HR 0245    1045  <LO MR/HR      <1.0 MR/HR lo      DOSE RATES IN MR/HR UNLESS
                                                                        ~        OTHERWISE INDICATED.
                                                                                                                    ./
        ~  tt21 eves  HOLD-UP TANK
[2t1
                                                ~
        ~  #22    eves HOLD-UP TANK if'2lj
                                                ~              Kil
        ~                                      ~
CJ
            #23  eves HOLD-UP TANK CJ li!ili                          0          CJ
                        .d.      NOIUIHi 9.3.12
 
UNIT TWO
* AUX BUILDING 55' EL RADIOLOGICAL INFORMATION DATE OF DRILL:  JUNE 23, 1993      ...
DRILL mAE(S) : 0000 -  END REAL TIME(S) : 0800 -  END AIR SAMPLE DATA : SEE GENERAL AREA AUX BUILDING AIR DATA CONTAMINATION LEVELS: N/A D      DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
AUX  BLB SUMP TANK
                                              ~
* 9.3.13
 
UNIT TWO AUX BUILDil\TA 45'      E'!"'
i I
I l
i
                                        . .                  #21
[IQ] ~~R RADIOLOGICAL INFORMATION I~    #21 DATE OF DRILL:  JUNE 23, 1993
                                                    \30\    ~~~p DRILL TIME(S) : 0000 -  END                  #21 RHR  r-:/
SUMP  C\J REAL TIME(S) : 0800 -  END
                                                      ~
AIR SAMPLE DATA : SEE GENERAL AREA AUX BUILDING AIR DATA.                ~
CONTAMINATION LEVELS: N/A D      DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
9.3.14 i
_J
 
UNIT TWO
* MEC*HANICAL PENETRATION 78' EL
  ~
I BORON INJECTION TANK RADIOLOGICAL INFORMATION DATE OF DRILL:  JUNE 23, 1993 DRILL TIME(S) : 0000 -  END REAL TIME(S) : 0800 -    END AIR SAMPLE DATA : SEE GENERAL AREA AUX BUILDING AIR DATA
* CONTAMINATION LEVELS : N/A D    DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
9.3.15
 
U/2      R45 SHED 100' EL  *I I  PUMPS      ,
j <0.1 I
:::0 s:::
1cfb
{/)
2R45 GRAB SAMPLE I
    -0 J>                                    SKID z        I r'T1 r
: <0.1 I            i          . -*
I                                                        __,I
                                                    \ <0.1 L                                184    I INTERFACE I BOX    I 0        \ <0.1 I                              I <0.1 I 2R45 SHED RADIOLOGICAL INFORMATION DATE OF DRILL:    JUNE 23, 1993 DRILL TIME(S) : 0000 -      0119 REAL TIME(S) : 0800 -          0919 CONTAMINATION LEVELS: N/A D      DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
9.3.15. **
 
(                                                U /2 R45 SHED \
* I I
100' EL
      ;:o s:::
(/)
              ~                  I. 100 2R45 GRAB "lJ
      )>
SAMPLE z                                SKID r'1 r
100 100 184 INTERFACE BOX 100 0                                        100 2R45 SHED d  NC!Dt~CIH~
RADIOLOGICAL INFORMATION DATE OF DRILL:  JUNE 23, 1993 DRILL TIME(S) : 0120 -      0245 REAL TIME(S) : 0920 -      1045 CONTAMINATION LEVELS: N/A
* D    DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
9.3.16
 
U /2 R45 . SHED I
100' EL.
I <0.1
:;o s:::
(/)  .                          2R45 GRAB
  -0                                  SAMPLE
  )>
SKID z
l"T'1 r
                <0.1            .___..____.,___I..__---
I <0.1  I I  184 INTERFACE I BOX 0        I <0.1 .\                          I <0.1 2R45 SHED RADIOLOGICAL INFORMATION DATE OF DRILL:  JUNE 23. 1993 DRILL TIME(S) : 0246 -    END REAL TIME(S) : 1046 -        END CONTAMINATION LEVELS: N/A D      DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
9.3.17
 
UNIT Two\
* MEC.HANICAL PENETRATION 100' EL 2R13 ABC (g]                                    STEAM GENERATOR BLOWDOWN TANKS AIRLOCK
  ~
* D
    # 2, FHB D
EXHAUST FAN
                                              ~
                                                            ~
    # 22 FHB D D                                              ~
EXHAUST FAN RADIOLOGICAL INFORMATION .
DATE OF DRILl.:  JUNE 23, 1993 .
DRILL TIME(S) : 0000 -  END REAL TIME(S) : 0800 -    END AIR SAMPLE DATA : SEE GENERAL AREA AUX BUILDING AIR DATA AMS READING (IF ANY}:    400 CCPM
              @ AMS  CCONTINUOUS AIR MONITOR>
CONTAMINATION LEVELS: N/A D      DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
9.3.18
 
u/2    -~ux BUILDING RELAY ROOM.
64' EU
[91 I ND. 2A-4160V VITAL BUS I  NO. 2B-41GOV VITAL BUS                  I NO. 2C 4260V VITAL BUS 7
I                    I 7
z
              ,.....,,~,,...,,
2...,..r,.......,L  BATTERY R[J[]H    ~
LT~    aJS            I                    I 4    NC!HU!tii RADIOLOGICAL INFORMATION DATE OF DRILL:            JUNE 23, 1993 DRILL TIME(S) : 0000 -                    END REAL TIME(S) : 0800 -                      END AIR SAMPLE DATA : 1E-12 uCi/cc (Gross)
CONTAMINATION LEVELS: N/A D      DOSE RATES IN MR/HR UNLESS OTHERWISE INDICATED.
9.3.19
 
IOJTH rLA"T VCHT
                                              !6 17 ILIC.
                                                                                  ---*-*---*--,-=-  =====-----
H.H.
                                                                                              &deg;'
TCL.KH.
Artificial Island                                                    l>FROCCSSll\L fACILITY Emergency Plan Annual Exercise                                        PARKING AREA "Onsite Plume Map" REAL TIME:  09:20 DRILL TIME: 01:20 0.1" OF CENTERLINE = --------------
Ill: OF CENTERLINE= -      -* - .. - .. -
10" OF CENTERLINE =                        .
110" OF CENTERLINE * - - - -        - - -                              G9
                          .tlQill  PLUME DISTANCES MEASURED IN METERS.
\
  \\
                  '' \
                        \
  .colf:li.                                                                                                  AlO
  .                                                                                                                        DHAVAR[ RIVfR
 
lttf-
                                                      &deg;'
TCL M.H.
Artificial Island Emergency Plan Annual f.xercise                    PARKING AREA "Onsite Plume Map BEAL TIME:  09:30 DRILL TIME:  01:30 0.1~  OF CENTERLINE  = --------------
eH4    1"  or CENTEBUNE = - -* -**- -
10"  or CENTERLINE =                                  G9 110" or CENTERLINE = - - - -    ---                            0111a JiDill  PLUME DISTANCES MEASURED IN METERS.
AlO
.N
 
17 IUC.
16                          H.H.
TCL. M.H.
Artificial Island Emergency Pla.n Annual Exercise                      PARKING AREA "Onsite Plume Map" REAL TIME:  09:411 DBW. TIME:  01:411 0.1:1: OF CENTERLINE IX  or  CENTERUNE IOX OF CENTERUNE
                            ===-------
50:1: OF CENTERUNE *    - - -' -  - - -
BQI1.;  PLUME DISTANCES MEASURED IN METERS.
                                                                          .._..-.!!e_P_c~!!. !:!..~-
.co                                                                  AlO                                          ------- --------
~                                                                                                  DHAVARf RIVER
.~
 
llllTH PLNilT llDIT I6 JM"RDCCSSJl'4i Artificial Island                            rACILITY Emergency Plan Annual Exercise              PARKING AREA "Onsite Plume Map" REAL TIME:  10:00 DBW. TIME: 02:00 0.1" OF CENTERUNE = --------------
IX or CENTEJUJNE = -      -**-**- *-
eH4          IOX or CENTERUNE .. - - - - - -
110" or CBNTERUNB * - - - -      -- -
      .lfill'I;  PLUME DISTANCES MEASURED IN METERS.
700
.co
~
AlO DHAVAR[ RIVER                      -------
~
 
lllJTH
                ,L#IT
                  \/(NT 16 17 ...._.__
                                                      &deg;'
TCL MJl Artificial Island Emergency Plan Annual Exercise "Onsite Plume Map"                  PARKING AREA REAL TIME:  IO:Ui DRllL TIME: 02:UI 0.1:1: OF CENTERLINE = --------------
1': OF CENTERLINE = -        ----**-**-
10~ OF CENTERIJNE = - - - - - -
50~ OF CENTERLINE :i:: - - - - - - -                G9 lHIIEl    PLUME DISTANCES MEASURED IN METERS.
SIJITCHYARD
.co                                                                  AlO
~                                                                        DfLAVAR[ RIVfR
.C1t
 
Artificial Island                                  lll'ROC[SSINJ r.CILITY Emergency Pla.n Annual Exercise              PARKING .AREA "Onsite Plume Map*
REAL TIME: 10:30 DRILL THIE: 02:30 O.lX OF CENTERUNE = --------------
IX or CENTERIJNE = - . - **- **- .. "'."""
eH4                    IOX or CENTERUNE  =
llOX or CENTERUNE * - - - -    ---              G9
                  .lilrill PLUME DISTANCES MEASURED IN METERS.                                                                              ---
                                                                                                                  ----~---------600
                                                                                                      -------500 SALEM S\rllTCHYARD
\\
  \
    '\
        '' \
            \
.co                                                                            AlO                                                  -------
.~
DfLAVAR[ RIVER
.m
* 16
                                                                          ------====::::::::::==--~-
1----::lttf:r=========,-~-
TCL KH.
Artificial Island                                                    l~~OCCSSl"'.J fACILITY Emergency Plun Annuul Exercise                          PARKING AREA "Onsite Plume Map" REAL TIME: 10:4&
DRW. TIME: 02:4&
O.l~  OF CENTERLINE = --------------
IX OF CENTERLINE= - *-**- * - * * -
10~ OF CENTERUNE =                                                                                            ~~~
                      &OX OF CENTERUNE * - - - - - - -
llml    PLUME DISTANCES MEASURED IN METERS.
SALEM S\JITCHYARD
\
  \
    '\
      '\
            '\
  .co                                                                                          AlO                            ------
  .~                                                                                                            OClAVAR[ RIV&#xa3;R
  .""2
 
16 I7\ L--:-::r:=========-----
lttf TtL JUl Artificial Island Emergency Plan Annual Exercise                    PARKING AREA "Onsite Plume Map" REAL TIME:  ll :00 DRILL TIME: 03:00 D.lX OF CENTERLINE = --------------
lX or CENTEBUNE = - *- *-**-**-
lOX OF CINTERUNB ::1 - - - - - -
llOX OF CINTERUNI * - - - -    ---                    G9
      .tmTI;  PLUME DISTANCES MEASURED IN METERS.
SALEM S\./ITCHYARD
.co                                                                    AlO                        -------- ------
.~
DELAVAR[ RIV&#xa3;R
.CXl
 
16 TCL M.H.
Artificial Island Emergency Plan AnnuaL f,xercise                PARKING AREA "Onsite Plume Map REAL TIME:
DRILL TIME:
11: 111 03:111                                                                                                    --
D.U: OF CENTERLINE = --------------
Ill: OF CENTERUNE = - *-**-**-**-                                                                                ---
                                                                                                                            -- ----eiao-ID" OF CENTERLINE m CID" OF CBNTERUNB * - - - -    -- -                                            --
oiaL* ............
lfDIEl    PLUME DISTANCES MEASURED IN METERS.                                -----f,oo ___ _
SALEM S\rllTCHYARD
\
  \
    \
      \\
          \
            \,
              \
                \
                  \\
                    \
AlO                                                        ----------
llELAVAR[ RIVER
    .co
 
17lL.:--~======-_.
llllTN PLANT lltHT
                      !6 IUf "
TCL. MK Artificial Island Emergency .Plan Annual Exercise                        PARKING AREA "Onsite Plume Map"                                                                                            _.... __ ............
REAL TIME:  11:30 DRILL TIME: 03:30 O.llll: OF CENTERLINE = --------------
1" OF CENTERLINE= -          -**-**- * -
10lll: OF CENTERLINE=------
50" OF CENTERLINE * - - - -        - - -
1llll'll PLUME DISTANCES MEASURED JN METERS.
SALEM S\./ITCHYARD
                                                                          .._....._P~~':_C!!!. .!:!.NE_
AlO                                              -------
                                                                                                        .DfLAVAR[ RIV&#xa3;R
 
16 I 7LL---:::r========--
lttf TCL MJt.
Artificial Island Emergency Plan Annual Exercise                        PARKING AREA "Onsite Plume Map" REAL TIME:  11:411 DRILL TIME: 03:411 D.U: OF CBNTERIJNE = --------------
IX OF CENTERLINE= - *-* - * * - * * -
lDlC OF CENTERUNI'" - - - - - -
llOlC OF CENTERLINE * - - - -    -- -
                      .lillrll PLUME DISTANCES MEASURED IN    METERS.
SALEM SIJlTCHYARD
\ D4
  \
      \,
          \
              '\
                  \
                    \
                      '\
                                                                                                ----"!~&#xa3;~rr LIN[
.cotfli.                                                                                  AlO                                          ------- -------- ------
  .                                                                                                              OCLAVAR[ RIVER
 
                                        ***** Salem Generating Station Plume Data *****
06/23/93                                                  593-03 Location 1 Centerline                              Meters      100                                Miles    0.10
                        ..                    Survey Instrument                  Gross Readings                    Particulate  Iodine-131 Field    Net          Net Open      Closed        Team    c.P.M.      C.P.H.      Thyroid Wind    Wind      Window      Window    Exposure  Assumes    Assumes      Inhalation Real  Drill      Dir    Speed  Beta/Gamma    Gamma        Rate  10 Cu.Ft &  10 Cu.Ft &    Dose Rate Time  Time    &deg; From  MPH      (mRad/hr)    (mR/hr)    (mR/min)  10% Eff. 0.2% Eff.    (mRem/hr) 08:00 00:00    296.00    5.50    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09120 01:20    289.00    5.79  2.16E+02    l.73E+02      2.BBE+OO    <  100      <  100        < 0.2 09130 01130    286.50    5.82  2.13E+02    l.71E+02      2.85E+OO    <  100      <  100        < 0.2 09145 01:45    279.50    5.88  l.63E+02    l.31E+02      2.lBE+OO    <  100      <  100        < 0.2 10:00 02:00    266.00    5.93  3.62E+Ol    2.90E+Ol      4.83E-01    <  100      <  100        < 0.2 10:15 02115    258.00    5.98  7.75E+OO    6.62E+OO      l.lOE-01    <  100      <  100        < 0.2 10:30 02130    250.00    6.04  7.00E-01    5.60E-Ql      9.33E-03    <  100      <  100        < 0.2 10:45 02:45    245.00    6.09    < 0.2      < o.2      O.OOE+OO    <  100      <  100        < 0.2 11:00 03100    244.22    6.14    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11115 03115    243.44    6.20    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:30 03130    242.67    6.25    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:45 03:45    241.89    6.30    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 12:00 04:00    241.11    6.36    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 22:00 14:00    210.00    8.50    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2
                              *** NOTE : Waist and ground level readings are the same.
IO N
'I I.
 
                                    ***** Salem Generating Station Plume Data *****
06/23/93                                                  S93-03 Location : Centerline                              Meters                                          Miles    0.10
* Survey Instrument                  Gross Readings                    Particulate  Iodine-131 Field      Net          Net Open      Closed    Team      C.P.M.      C.P.M.      Thyroid Wind    Wind      Window      Window  Exposure    Assumes    Assumes      Inhalation Real  Drill    Dir    Speed  Beta/Gamma    Gamma      Rate    10 cu.Ft &  10 Cu.Ft &    Dose Rate Time    Time  &deg; From    MPH      (mRad/hr)    (mR/hr) (rnR/rnin)  10% Eff. 0. 2% Eff..  (rnRern/hr) 08:00  00:00  296.00    5.50    < 0.2      < 0.2  O.OOE+OO      <  100      <  100        < 0.2 09:20  01:20  289.00    5.79  6.70E+Ol    S.37E+Ol  8.9SE-Ol      <  100      <  100        < 0.2 09130  01:30  286.50    5.82  6.46E+Ol    5.17E+Ol  8.62E-01      <  100      <  100        < 0.2 09:45  01:45  279.50    5.88  4.96E+Ol    3.97E+Ol  6.62E-Ol      <  100      <  100        < 0.2 10:00  02:00  266.00    5.93  1.lOE+Ol    8.BOE+OO  1.47E-Ol      <  100      <  100        < 0.2 10:15  02:15  258.00    5.98  2.38E+OO    l.90E+OO  3.17E-02      <  100      <  100        < 0.2 10:30  02:30  250.00    6.04  2.50E-Ol    2.00E-01  3.33E-03      <  100      <  100        < 0.2 10145  02:45  245.00    6.09    < 0.2      < 0.2  O.OOE+OO      <  100      <  100        < 0.2 11100  03:00  244.22    6.14    < 0.2      < 0.2  O.OOE+OO      <  100      <  100        < 0.2 11:15  03115  243.44    6.20    < 0.2      < 0.2  O.OOE+OO      <  100      <  100        < 0.2 11130  03:30  242.67    6.25    < 0.2      < 0.2  O.OOE+OO      <  100      <  100        < 0.2 11145  03:45  241.89    6.30    < 0.2      < 0.2  O.OOE+OO      <  100      <  100        < 0.2 12:00 *04:00  241.11    6.36    < 0.2      < 0.2  O.OOE+OO      <  100      <  100        < 0.2 22:00  14:00  210.00    a.so    < 0.2      < 0.2  O.OOE+OO      <  100      <  100        < 0.2
                        *** NOTE    Waist and ground level readings are t'he same.
    ~
w
 
                                    ***** Salem Generating Station Plume Data *****
06/23/93                                                      S93-03 Location : Centerline                            Meters        300                                  Miles    0.20 Survey Instrument                      Gross Readings                      Particulate  Iodine-131 Field      Net          Net Open        Closed        Team      C.P.M.      C.P.M.      Thyroid Wind    Wind      Window      Window    Exposure    Assumes    Assumes      Inhalation Real  Drill    Dir    Speed  Beta/Gamma      Gamma        Rate    10 Cu.Ft &  10 cu.Ft &    Dose Rate Time    Time  &deg; From    MPH      (rnRad/hr)    (mR/hr)    (rnR/min)  10% Eff. 0.2% Eff.    (rnRem/hr) 08:00  00:00    296.00    5.50    < 0.2        < 0.2      O.OOE+OO      <  100      <  100        < 0.2 01:20    289.00    5.79  3.48E+Ol    2.79E+Ol      4.65E-01      <  100      <  100        < 0.2 09:20 01:30    286.50    5.82  3.23E+Ol    2.59E+Ol      4.32E-01      <  100      <  100        < 0.2 09:30 01:45    279.50    5.ae  2.49E+Ol    1.99E+Ol      3.32E-Ol      <  100      <  100        < 0.2 09:45 02:00  266.00    5.93  5.54E+OO    4.43E+OO      7.38E-02      <  100      <  100        < 0.2 10:00 02:15  258.00    5.98  1.18E+00    9.40E-Ol      1.57E-02      <  100      <  100        < 0.2 10:15 02:30  250.00    6.04    < 0.2        < 0.2      O.OOE+OO      <  100      <  100        < 0.2 10r30 02:45  245.00    6.09    < 0.2        < 0.2      O.OOE+OO      <  100      <  100        < 0.2 10145 03:00    244.22    6.14    < 0.2        < 0.2      O.OOE+OO      <  100      <  100        < 0.2 lltOO 03:15    243.44    6.20    < 0.2        < 0.2      O.OOE+OO      <  100      <  100        < 0.2 11:15 03:30  242.67    6.25    < 0.2        < 0.2      O.OOE+OO      <  100      <  100        < 0.2 11:30 03:45  241. 89    6.30    < 0.2        < 0.2      O.OOE+OO      <  100      <  100        < 0.2 11:45 04:00  241.11    6.36    < 0.2        < 0.2      O.OOE+OO      <  100      <  100        < 0.2 12:00 14:00  210.00    a.so    < 0.2        < 0.2      O.OOE+OO      <  100      <  100        < 0.2 22100
                        *** NOTE    Waist and ground level readings are the same.
    .'&deg;
 
Salem Generating Station Plume Data *****
06/23/93                                                    593-03 Location : Centerline                              Meters      400                              Miles    0.20 Survey Instrument                    Gross Readings                    Particulate  Iodine-131 Field      Net          Net Open      Closed      Team      C.P.M.      C.P.M.      Thyroid Wind    Wind      Window      Window    Exposure  Assumes    Assumes    Inhalation Real    Drill    Dir    Speed    Beta/Gamma    Gamma        Rate    10 Cu.Ft &  10 Cu.Ft &  Dose Rate Time    Time  &deg; From    MPH      (mRad/hr)    (mR/hr)    (mR/min)  10\ Eff. 0.2\ Eff.  (mRem/hr) 08:00  00:00  296.00    5.50      < 0.2      < 0.2      O.OOE+OO    <  100    <  100        < 0.2 09:20  01:20  289.00    5.79  2.25E+Ol    l.BOE+Ol      3.00E-01    <  100    <  100        < 0.2 09:30  01:30  286.50    5.82  2.00E+Ol    1.60E+Ol      2.67E-01    <  100    <  100        < 0.2 09:45  01:45  279.50    5.88  l.53E+Ol    l.23E+Ol      2.05E-01    <  100    <  100        < 0.2 10:00  02:00  266.00    5.93  3.3BE+00    2.70E+OO      4.50E-02    <  100    <  100        < 0.2 02:15  258.00    5.98  7.30E-01    5.BOE-01      9.67E-03    <  100    <  100        < 0.2 10:15 10:30  02:30  250.00    6.04      < 0.2      < 0.2      O.OOE+OO    <  100    <  100        < 0.2 10:45  02145  245.00    6.09      < 0.2      < 0.2      O.OOE+OO    <  100    <  100        < 0.2 03:00  244.22    6.14      < 0.2      < 0.2      O.OOE+OO    <  100    <  100        < 0.2 11100 03:15  243.44    6.20      < 0.2      < 0.2      O.OOE+OO    <  100    <  100        < 0.2 11:15 03:30  242.67    6.25      < 0.2      < 0.2      O.OOE+OO    <  100    <  100        < 0.2 11130 11145  03:45  241.89    6.30      < 0.2      < 0.2      O.OOE+OO    <  100    <  100        < 0.2 04:00  241.11    6.36      < 0.2      < 0.2      O.OOE+OO    <  100    <  100        < 0.2 12:00 22:00  14:00  210.00    a.so      < 0.2      < 0.2      O.OOE+OO    <  100    <  100        < o.2
                        ***  NOTE  Waist and ground level readings are the same.
    .'&deg; Ul
 
                                    ***** Salem Generating Station Plume Data *****
06/23/93                                                    593-03 Location 1 Centerline                            Meters        500                                Miles    0.30 Survey Instrument                    Gross Readings                      Particulate  Iodine-131 Field    Net          Net Open        Closed      Team      C.P.M.      C.P.M.      Thyroid Wind    Wind      Window      Window    Exposure  Assumes    Assumes      Inhalation Real  Drill    Dir    Speed  Beta/Gamma    Gamma        Rate    10 Cu.Ft &  10 cu.Ft &    Dose Rate Time  Time  &deg; From    MPH      (mRad/hr)    (mR/hr)    (mR/min)  10% Eff. 0.2% Eff.    (mRem/hr) 08100 00:00  296.00    s.so    < 0.2        < 0.2      O.OOE+OO    <  100    <  100        < 0.2 09120 01120  289.00    5.79  1.62E+Ol    1.30E+Ol      2.17E-Ol    <  100    <  100        < 0.2 09130 01130  286.50    5.82  1.37E+Ol    l.lOE+Ol      1.83E-Ol    <  100      <  100        < 0.2 09145 01145  279.50    5.ee  l.OSE+Ol    8.46E+OO      1.41E-01    <  100      <  100        < 0.2 10100 02100  266.00    5.93  2.40E+OO    1.90E+OO      3.17E-02    <  100      <  100        < 0.2 10115 02115  258.00    5.98  5.00E-01    4.00E-01      6.67E-03    <  100    <  100        < 0.2 10130 02130  250.00    6.04    < 0.2      < 0.2      O.OOE+OO    <  100    <  100        < 0.2 10145 02145  245.00    6.09    < 0.2      < 0.2      O.OOE+OO    <  100    <  100        < 0.2 11100 03100  244.22    6.14    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11115 03115  243.44    6.20    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11130 03130  242.67    6.25    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11145 03145  241.89    6.30    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 12100 04100  241.11    6.36    < 0.2      "< 0.2      O.OOE+OO    <  100      <  100        < 0.2 22100 14100  210.00    a.so    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2
                        *** NOTE    Waist and ground levei readings are the same.
ID
      ~
en
 
Salem Generating Station Plume Data    *****
06/23/93                                                        S93-03 Location        Centerline                                Meters      600                                Miles    0.40 Survey Instrument                    Gross Readings                      Particulate  Iodine-131 Field      Net          Net Open      Closed        Team      C.P.M.      C.P.M.      Thyroid Wind      Wind        Window      Window    Exposure    Assumes    Assumes    Inhalati.on Real  Drill    Dir      Speed    Beta/Gamma    Gamma        Rate    10 Cu.Ft &  10 Cu.Ft &  Dose Rate Time    Time  &deg; From    MPH        (mRad/hr)    (mR/hr)    (mR/min)    10% Eff. 0.2% Eff.    (mRem/hr)
PS:OO  00:00    296.00      s.so      < 0.2      < 0.2      O.OOE+OO      <  100      <  100        < 0.2 09:20  01120    289.00      S.79    1.26E+Ol    1.0lE+Ol      1.6BE-01      <  100      <  100        < 0.2 09:30  01130    286.50      5.82    1.0lE+Ol    8.lOE+OO      1. 35E-01    <  100      <  100        < 0.2 09145  01:45    279.50      5.88    7.75E+OO    6.20E+OO      1.03E-01      <  100      <  100        < 0.2 10:00  02:00    266.00      S.93    1.75E+OO    1.40E+OO      2.33E-02      <  100      <  100        < 0.2 10:15  02:15    258.00      5.98    3.70E-Ol    3.00E-Ol. 5.00E-03      <  100      <  100        < 0.2 10130  02:30    250.00      6.04      < 0.2      < 0.2*    O.OOE+OO      <  100      <  100        < 0.2 10145  02145    245.00      6.09      < 0.2      < 0.2      O.OOE+OO      <  100      <  100        < 0.2 11100  03:00    244.22      6.14      < 0.2      < 0.2      O.OOE+OO      <  100      <  100        < 0.2 11:15  03:15    243.44      6.20      < 0.2      <. 0.2    O.OOE+OO      <  100      <  100        < 0.2 11130  03130    242.67      6.25      < 0.2      < 0.2      O.OOE+OO      <  100      <  100        < 0.2 11145  03:45    241.89      6.30      < 0.2      < 0.2      O.OOE+OO      <  100      <  100        < 0.2 12:00  04100    241.11      6 * .36    < 0.2      .< 0.2      O.OOE+OO      <  100      <  100        < 0.2 22:00  14:00    210.00      a.so      < 0.2      < 0.2      O.OOE+OO      <  100      <  100        < 0.2
                            ***  NOTE    Waist and ground level readings are the same.
    ..'&deg;,,.,
 
                                  ***** Salem Generating Station Plume Data *****
06/23/93                                                  S93-03 Location : centerline                            Meters      700                                Miles    0.40 Survey Instrument                    Gross Readings                    Particulate  Iodine-131 Field      Net          Net Open      Closed      Team      C.P.M.      C.P.M.      Thyroid Wind    Wind      Window      Window    Exposure  Assumes    Assumes      Inhalation Real    Drill    Dir    Speed  Beta/Gamma . Gamma          Rate    10 cu.Ft &  10 cu.Ft & Dose Rate Time    Time  &deg; From  MPH      (mRad/hr)    (mR/hr)    (mR/min)  10% Eff *. 0.2% Eff.    (mRem/hr) 08:00  00:00  296.00    5.50    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09:20  01:20  289.00    S.79  1.03E+Ol    8.26E+OO      1.38E-01    <  100      <  100        < 0.2 09:30  01:30  286.50    5.82  7.80E+OO    6.26E+OO      1.04E-Ol    <  100      <  100        < 0.2 09:45  01:45  279.50    5.88  6.00E+OO    4.BOE+OO      8.00E-02    <  100      <  100        < 0.2 10100  02100  266.00    5.93  1.40E+00    1.lOE+OO      1.83E-02    <  100      <  100        < 0.2 10115  02115  258.00    5.98  2.SOE-01    2.00E-01      3.33E-03    <  100      <  100        < 0.2 10130  02130  250.00    6.04    < 0.2      < 0.2:    O.OOE+OO    <  100      <  100        < 0.2 10145  02:45  245.00    6.09    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11100  03100  244.22    6~14    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:15  03115  243.44    6.20    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11130  03130  242.67    6.25    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11145  03145  241.89    6.30    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 12100  04100  241.11    6.36    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 22100  14100  210.00    a.so    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2
                        *** NOTE : Waist and ground level readings are the same *
 
                                          ***** Salem Generating Station Plume Data *****
06/23/93                                                  S93-03 Location          Centerline                            Meters      800                                Miles    0.50 Survey Instrument                  Gross Readings                    Particulate  Iodine-131 Field    Net          Net Open      Closed        Team    C.P.M.      C.P.M.      Thyroid Wind    Wind      Window      Window    Exposure  Assumes    Assumes      Inhalation Real  Drill    Dir    Speed  Beta/Gamma    Gamma        Rate  10 Cu.Ft &  10 Cu.Ft &    Dose Rate Time    Time    &deg; From  MPH      (mRad/hr)    (mR/hr)    (mR/min)  10% Eff. 0.2% Eff.    (mRem/hr) 08:00  00:00    296.00    5.50    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09:20  01:20    289.00    5.79  8.76E+OO    7.0lE+OO      l.17E-Ol    <  100      <  100        < 0.2 09130  01:30    286.50    5.82  6.26E+OO    5.0lE+OO      8.35E-02    <  100      <  100        < 0.2 09:45  01:45    279.50    5.88  4.75E+OO    3.BOE+OO      6.33E-02    <  100      <  100        < 0.2 10:00  02:00    266.00    5.93  l.06E+OO    8.SOE-01      l.42E-02    <  100      <  100        < 0.2 10:15  02:15    258.00    5.98    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 10:30  02:30    250.00    6.04    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 10:45  02:45    245.00    6.09    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:00  03100    244.22    6.14    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:15  03:15    243.44    6.20    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11130  03:30    242.67    6.25    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11145  03145    241.89    6.30    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 12:00  04100    241.11    6.36    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 22:00  14:00    210.00    a.so    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2
                              *** NOTE : Waist and ground level readings are the same.
 
                                          *****  Salem Generating Station Plume Data    *****
06/23/93                                                      593-03 Meters      900                                Miles    0.60 Location : Centerline Survey Instrument                    Gross Readings                    Particulate  lodine-131 Field      Net          Net Open      Closed      Team      .c. P.M. C.P.M .      Thyroid Window    Exposure  Assumes      Assumes    Inhalation Wind    Wind      Window Gamma        Rate    10 cu.Ft &  10 Cu.Ft &  Dose Rate Real  Drill    Dir    Speed    Beta/Gamma (mR/hr)  (mR/min)  10% Eff *. 0.2% Eff.    (mRem/hr)
Time  Time  &deg; From    MPH      (mRad/hr)
                                                                < 0.2      O.OOE+OO      <  100      <  100        < 0.2 08:00 00:00  296.00    5.50      < 0.2 6.46E+OO      1.0BE-01      <  100      <  100        < 0.2 09120 01120  289.00    5.79  8.0BE+OO 4.46E+OO      7.43E-02      <  100      <  100        < 0.2 09130 01130  286.50    5.82  5.58E+OO 3.40E+OO      5.67E-02      <  100      <  100        < 0.2 09145 01145  279.50    5.88  4.25E+OO 8.00E-01      1.33E-02      <  100      <  100        < 0.2 10100 02100  266.00    5.93  1.00E+OO O.OOE+OO      <  100      <  100        < 0.2 10115 02115  258.00    5.98      < 0.2      < 0.2
                                                                                                                  < 0.2 6.04      < 0.2      < 0.2      O.OOE+OO      <  100      <  100 10130 02130  250.00                                                                                0.2
                                                                < 0.2      O.OOE+OO      <  100      <  100        <
10145 02145  245.00    6.09      < 0.2                                                          < 0.2
                                                                < 0.2      O.OOE+OO      <  100      <  100 11100 03100  244.22    6.14      < 0.2                                                          < 0.2 6.20      < 0.2        < 0.2    O.OOE+OO      <  100      <  100 11115 03115  243.44                                                                                0.2 6.25      < 0.2        < 0.2    O.OOE+OO      <  100    <  100        <
11130 03130  242.67                                                                              < 0.2
                                                                < 0.2    O.OOE+OO      <  100    <  100 11145 03145  241.89    6.30      < 0.2                                                          < 0.2 6.36      < 0.2        < 0.2    O.OOE+OO      <  100    <  100 12100 04100  241.11                                                                              < 0.2 22100 14:00  210.00    a.so      < 0.2      . < 0.2    O.OOE+OO      <  100    <  100
                              ***  NOTE  Waist and ground level readings are the same.
          ....'&deg;
          .;.
0 I ',
i I
I 1  I
 
Salem Generating Station Plume Data  *****
06/23/93                                                    S93-03 Location          EAB                                  Meters      1270                                Miles    0.80 Survey Instrument                    Gross Readings                    Particulate  Iodine-131 Field    Net          Net Open      Closed        Team    C.P.M.      C.P.M.      Thyroid Wind    Wind      Window      Window    Exposure  Assumes    Assumes      Inhalation Real  Drill    Dir    Speed    Beta/Gamma    Gamma        Rate  10 Cu.Ft &  10 cu.Ft &    Dose Rate Time    Time  &deg; From  MPH      (mRad/hr)    (mR/hr)    (mR/min)  10% Eff. 0.2% Eff.    (mRem/hr) 08:00  00:00  296.00    5.50      < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09120  01:20  289.00    5.79  7.48E+OO    5.99E+OO      9.98E-02    <  100      <  100        < 0.2 09130  01:30  286.50    5.82  4.99E+OO    3.99E+OO      6.65E-02    <  100      <  100        < 0.2 09:45  01:45  279.50    5.88  3.SOE+OO    3.06E+OO      5.lOE-02    <  100      <  100        < 0.2 10:00  02:00  266.00    5.93  8.SOE-01    6.BOE-01      l.13E-02    <  100      <  100        < 0.2 10115  02:15  258.00    5.98      < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 10130  02:30  250.00    6.04      < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 10:45  02145  245.00    6.09      < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11100  03:00  244.22    6.14      < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11115  03:15  243.44    6.20      < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:30  03130  242.67    6.25      < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11145  03145  241.89    6.30      < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 12:00  04100  241.11    6.36      < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 22:00  14:00  210.00    a.so      < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2
                              *** NOTE : Waist and ground level readings are the same.
  ..'&deg;........
    .j>o
 
                                        ***** Salem Generating Station Plume Data *****
06/23/93                                                593-03 Location        E6                                  Meters    26                                Miles    0.02 Survey Instrument                  Gross R~adings                  Particulate Iodine-131 Field      Net        Net Open      Closed    Team      C.P~M.      C.P.M.      Thyroid Wind    Wind      Window      Window  Exposure    Assumes    Assumes    Inhalation Real  Drill    Dir    Speed  Beta/Gamma    Gamma    Rate    10 cu.Ft & 10 Cu.Ft &  Dose Rate Time  Time  &deg; From    MPH      (mRad/hr)    (mR/hr) (mR/min)    10% Eff. 0.2% Eff.    (mRem/hr) 08:00 00:00  296.00    s.so  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO  o.ooE:+oo      O.OOE+OO 09:20 01:20  289.00    5.79  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 09:30 01:30  286.50    5.82  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 09:45 01:45  279.50    5.88  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+.00      O.OOE+OO 10:00 02:00  266.00    5.93  3.52E+OO    2.BOE+OO  4.67E-02    O.OOE+OO  O.OOE+OO      O.OOE+OO 10:15 02:15  258.00    5.98  2.64E+Ol    2.31E+Or  3.85E-Ol      < 100      < 100        < 0.2 10130 02:30  250.00    6.04  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 10145 02:45  245.00    6.09  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 11:00 03:00  244.22    6.14  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 11:15 03:15  243.44    6.20  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+oo  O.OOE+OO      O.OOE+OO 11:30 03:30  242.67    6.25  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO  0.0.0E+OO      O.OOE+OO 11:45 03:45  241.89    6.30  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 12:00 04:00  241.11    6.36  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+oo      O.OOE+OO 22:00 14:00  210.00    a.so  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO
                            *** NOTE    Waist and ground level readings are the same.
    .......'&deg;
    .p.
N
 
Salem Generating Station Plume Data *****
06/23/93                                                  593-03 Location        EB                                  Meters      123                              Miles    0.08 Survey Instrument                  Gross Readings                  Particulate  Iodine-131 Field      Net        Net Open      Closed      Team    C.P.M.      C.P.M. Thyroid Wind    Wind      Window      Window    Exposure  Assumes    Assumes    Inhalation
            *Real  Drill    Dir    Speed    Beta/Gamma    Gamma        Rate  10 Cu.Ft &  10 Cu.Ft &.Dose Rate Time  Time  &deg; From    MPH      (mRad/hr)    (rilR/hr) (mR/min)  10% Eff. 0.2% Eff.  (mRem/hr) 08:00 00:00  296.00    5.50  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 09:20 01:20  289.00    5.79  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 09:30 01:30  286.50    5.82  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 09:45 01:45  279.50    s.ee  8.15E-Ol  6.5SE-01    1.09E-02  O.OOE+OO  O.OOE+OO      O.OOE+OO 10:00 02:00  266.00    5.93  3.60E-01  2.90E-Ol    4.83E-03  O.OOE+OO  O.OOE+OO      O.OOE+OO 10:15 02:15  258.00    5.98  O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 10:30 02:30  250.00    6.04  O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 10:45 02:45  245.00    6.09  O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 11:00 03:00  244.22    6.14  O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 11:15 03:15  243.44    6.20  O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+oo'  O.OOE+OO      O.OOE+OO 11:30 03:30  242.67    6.25  O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 11:45 03:45  241.89    6.30  O.OOE+OO*  O.OOE+OO    O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 12:00 04:00  241.11    6.36  O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 22:00 14:00  210.00    a.so  O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO
                            *** NOTE    Waist and ground level readings are the same.
    ......'&deg;
    ~
w
 
                                        ***** Salem Generating Station Plume Data ***k*
06/23/93                                                  S93-03 Location    Ell                                      Meters    406                                Miles    0.25 Survey Instrument                  Gross Readings                    Particulate  Iodine-131 Field      Net        Net Open      Closed    *Team      C. P.11. C.P.M.      Thyroid Wind    Wind      Window      Window  Exposure    Assumes    Assumes    Inhalation Real    Drill      Dir    Speed  Beta/Gamma    Gamma        Rate    10 Cu.Ft &  10 Cu.Ft & Dose Rate Time    Time      a From    MPH      (mRad/hr)    (mR/hr)  (mR/min)    10% Eff. 0.2% Eff.    (mRem/hr) 08:00  00:00      296.00    5.50  O.OOE+OO    O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 09:20  01:20      289.00    5.79  O.OOE+OO    O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 09:30  01:30      286.50    5.82  O.OOE+OO    O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+-00 09:45  01:45      279.50    5.88  O.OOE+OO    O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 10:00  02:00      266.00    5.93  O.OOE+OO    O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 10:15  02:15      258.00    5.98  7.30E-01    5.8oe-Ol    9.67E-03      < 100      < 100        < 0.2 10:30  02:30      250.00    6.04  O.OOE+OO    O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 10:45  02:45      245.00    6.09  O.OOE+OO    O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 11:00  03:00      244.22    6.14  O.OOE+OO    O.OOE+OO    O.ODE+OO    O.OOE+OO  O.OOE+OO      D.OOE+OO 11:15  03:15      243.44    6.20  O.OOE+OO    O.OOE+OO    O.OOE+DO    O.OOE+OO  O.OOE+OO      O.OOE+OO 11:30  03:30      242.67    6.25  O.OOE+OO    O.OOE+OO    D.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 11:45  03:45      241.89    6.30  O.OOE+OO    O.OOE+OO    D.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 12:00  04:00      241.11    6.36  O.OOE+OO    O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO 22:00  .14 :DO    210.00    a.so  O.OOE+OO    O.OOE+OO    O.OOE+OO    O.OOE+OO  O.OOE+OO      O.OOE+OO
                            *** NOTE    Waist and ground level readings *are the same.
ID
    ~
 
                                      ***** Salem Generating Station Plume Data *****
I 06/23/93                                                S93-03 Location    Cll                                    Meters    415                                Miles    0.26 Survey Instrument                  Gross Readings                  Particulate  Iodine-131 Field    Net          Net Open      Closed      Team    C.P.M.        C.P.M. Thyroid Wind    Wind    Window      Window    Exposure  Assumes      Assumes    Inhalation Real    Drill    Dir    Speed  Beta/Gamma  Gamma        Rate  10 Cu.Ft &  10 cu.Ft &  Dose Rate Time    Time    &deg; From    MPH    (mRad/hr)    (mR/hr)  (mR/min)  10% Eff. 0.2% Eff.  (mRem/hr) 08:00  00:00    296.00    5.50  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO      O.OOE+OO 09:20  *01: 20  289.00    5.79  O.OOE+oo*  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO      O.OOE+OO 09:30  01:30    286.50    5.82  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+oo      O.OOE+OO 09:45  01:45    279.50    5.88  1.15E+Ol  9.23E+Ol    1.54E+OO  O.OOE+OO    O.OOE+OO      O.OOE+OO 10:00  02:00    266.00    5.93  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO      O.OOE+OO 10:15  02:15    258.00    5.98  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO      O.OOE+OO 10:30  02:30    250.00    6.04  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO      O.OOE+OO 10:45  02:45    245.00    6.09  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO      O.OOE+OO 11:00  03:00    244.22    6.14  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO :. O.OOE+OO      O.OOE+OO 11:15  03:15    243.44    6.20  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO      O.OOE+OO 11:30  03:30    242.67    6.25  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO      O.OOE+OO 11:45  03:45    241.89    6.30  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO      O.OOE+OO 12:00  04:00    241.11    6.36  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO      O.OOE+OO 22:00  14:00    210.00    a.so  O.OOE+OO  O.OOE+OO    O.OOE+OO  O.OOE+OO    O.OOE+OO      O.OOE+OO
                          *** NOTE    Waist and ground level readings are the same.
    .ID
    ~
U1
 
                                      ***** Salem Generating Station Plume Data *****
06/23/93                                                    S93-03 Location      812                                  Meters        482                              Miles      0.30 Survey Instrument                      Gross Readings                      Particulate Iodine-131 Field    Net        Net Open        Closed        Team    C.P.M.      C.P.M.      Thyroid Wind    Wind      Window        Window    Exposure  Assumes    Assumes    Inhalation Real  Drill    Dir    Speed  Beta/Gamma      Gamma        Rate  10 Cu.Ft & 10 Cu.Ft & Dose Rate Time    Time  &deg; From    MPH      (mRad/hr)      (mR/hr)    (mR/min)  10\ Eff. 0. 2\ Eff.  (mRem/hr) 08:00  00:00  296.00    5.50    < 0.2        < 0.2      O.OOE+OO    < 100      < 100        < 0.2 09:20  01:20  289.00    5.79  B. lOE-01  6.SOE-01        l.OBE-02  O.OOE+OO  O.OOE+OO      O.OOE+OO 09:30  01:30  286.50    5.82  O.OOE+OO    O.OOE+OO        O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 09:45  01:45  279.50    s.a8  O.OOE+OO    O.OOE+OO        O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 10:00  02:00  266.00    5.93  O.OOE+OO    O.OOE+OO        O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 10:15  02il5  258.00    5.98  O.OOE+OO    O.OOE+OO        O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 10:30  02:30  250.00    6.04  O.OOE+OO    O.OOE+OO        O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 10:45  02:45  245.00    6.09  O.OOE+OO    O.OOE+OO        O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 11:00  03:00  244.22    6.14  O.OOE+OO    O.OOE+OO        O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 11:15  03:15  243.44    6.20  O.OOE+OO    O.OOE+OO        O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 11:30  03:30  242.67    6.25  O.OOE+OO    O.OOE+OO        O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 11:45  03:45  241.89    6.30  O.OOE+OO    O.OOE+OO        O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 12:00  04:00  241.11    6.36  O.OOE+OO    o *. ooE+oo    O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO 22:00  14:00  210.00    a.so  O.OOE+OO    O.OOE+OO        O.OOE+OO  O.OOE+OO  O.OOE+OO      O.OOE+OO
                          *** NOTE    Waist and ground level readings are the same.
    *.o
    .p.
CJ'I
* SECTION SECTION 10.0 TITLE 10.1  Offsite Plume Map              10.1.1 10.2  Offsite centerline Plime Data  10.2.1 10.3  Offsite specific Location Data 10.3.1 10.4  Met Forecast Data              10.4.1 10.0
*~
* THE LEADING EDGE OF THE PLUME IS AS FOLLOWS :
1 MILE = 09:30/01:20 2 MILES    = 09:45/01:45
* 4 MILES    = 10:00/02:00
        . 5 MILES = 10:15/02:15 7 MILES = 10:30/02:30 8 MILES = 10:45/02:45 10 MILES = 11:00/03:00
* 10.1.1.a
 
Artificial Island Emergency PLan Annual Exercise "Of/Bite Plume Map" REAL TIME: 09:20 DRW. TIME: 01:20 0.1~      CENTERLINE l?. OFCENTERIJNE or            ==_,,_,,_,,_,,_,,_
10~  OF CENTERLINE
* 110?. OF CENTERLINE * -    *--* - -
ENE20
 
Artificial Island Emergency Plan Annual Exercise "Of/site Plume Map" REAL TIME:  09:30 DRIU. TIME:  01:30 0.1:1: OF CENTERLINE = -----------------
: 17. or  CENTERUNE = _,,_,,_,,_, __ ,,_
10?. or  CENTERUNE  = ------
507. OF CENTERUNE = - - - - - - -
ENE20
 
Artificial Island Emergency Plan Annual Exercise "Of/site Plume Map" REAL TIME: 09:45 DRILL THIE: 01:45 O.U: OF CENTERUNE = ----------------
IX or CENTERUNE = -**-**-**-**-**-
lOX OF CENTERUNE    =
50X OF CENTERUNE * - - - - - - - - -
* ENE20
 
Artificial Island Emergency Plan Annual Exercise "Of/Bite Plume Map" REAL TIME:  10:00 DRILL TIME:  02:00 0.1~ OF CENTERLINE  = --------------
!?. OF CENTERUNE  = -**-**-**-**-**-
10" OF CENTERLINE a 50" OF CENTERUNE * - - - - - - -
ENE20
* Artificial Island Emergency Plan Annual Exercise "Oflsite Plume Map" REAL TIME:  IO:UI DRILL TIME:  02:111 0.1:111 OP CENTERUNE    = ******-***-*-**
IX OF CENTERIJNE = - .. -**-**-**-**-
IOX OP CBNTERIJNE ,.
llO:C OP CENTERIJNE * - - - - * - -
* ENE20
 
Artificial Island Emergency Pta.n Annual Exercise "O/fsite Plume Map" REAL TIME:  10:30 DRW. TIME:  02:30 0.1:1:
1?. orOFCENTERLINE CENTERLINE==_,,_,,_,,_,,_,,_
10?. or CENTERLINE .. - - - - - -
110" or CENTERLINE .. - - - - - - -
ENE20
 
Artificial Island Emergency Plan .Annual Exercise "Oflsite Plume Map" REAL TDIE:  l0:45 DRW. TIME:  02:45 D.1" OP CENTERUNE    = --------------
1" OP CENTERUNE = _,,_,,_,,_,,_,,_
10" or CENTERUNE =
50:1: OF CENTERUNE * - - - - - - - - -
ENE20
 
Artificial Island Emergency Plan Annual Exercise "Oflsite Plume Map" REAL TIME:    11:00 DRIIJ. TIME:  03:00 0.1"  or  CENTIRUNE    = ------------
,,.. OF CENTERLINE = -**-**-**-**-**-
JO:C OF CINTDLINE
* or 110"    CENTERLINE * - - - - - - -
ENE20
 
Artificial Island Emergency Plan Annual Exercise "Of/site Plume Map" REAL TIME: ll:lli DRILL THAB: 03:111 O.l:C OF CENTERUNE 1:r. OF CENTERUNE  ==_,,_,,_,,_,,_,,_
1o:r. or CENTERLINE .. - - - - - -
so:r. OF CENTERUNE * - - - - - - -
* ENE20 E
 
Artificial Island Emergency Plan .Annual Exercise "Oflsite Plume Map" REAL TDIE:  11:30 DRW. TJMB:  03:30 O.l"                =--------------
CENTERUNEa _,,_,,_,,_,,_,,_
1"- OFOFCENTERLINE 10'1: OF CBNTEBLINB * - - - - - -
&0'1: or CBNTERLINB * - - - - - - -
ENE20
 
Artificial Island Emergency Plan Annual Exercise "Oflsite Plume Map" REAL TIME:  l1:45 DRILL TIMB:  03:45 0.1" OF CENTERUNE 1'1: 011' CENTERUNE 10?. OF CENTERLINE s
                      ==-**-**-**-**-**-
50?. OF CENTERUNI * ~---------
* ENE20
 
                                        ***** Salem Generating Station Plume Data *****
06/23/93                                                    593-03 Location      Centerline                            Meters      1609                                  Miles    I.DO Survey Instrument                    Gross Readings                      Particulate  Iodine-131 Field    Net            Net Open      Closed        Team    C.P.M.        C.P.M.      Thyroid Wind    Wind      Window      Window      Exposure  Assumes      Assumes      Inhalation Real  Drill    Dir    Speed  Beta/Ganuna    Ganuna        Rate  10 Cu.Ft &  10 Cu.Ft & Dose Rate Time    Time    &deg; From    MPH      (mRad/hr)    (niR/hr)    (mR/min)  10% Eff. O. 2% Eff.    (mRem/hr) 08:00  00:00    296.00    5.50    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09:20  01:20    289.00    5.79    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09:30  01:30    286.50    5.82  3.0BE+OO    2.47E+OO      4.12E-02    <  100      <  100        < 0.2 09:45  01:45    279.50    5.88  2.38E+OO    l.90E+OO      3.17E-02    <  100      <  100        < 0.2 10:00  02:00    266.00    5.93  5.00E-01    4.00E-01      6.67E-03    <  100      <  100        < 0.2 10:15  02:15    258.00    5.98    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 10:30  02:30    250.00    6.04    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 10:45  02:45    245.00    6.09    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:00  03:00    244.22    6.14    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:15  03:15    243.44    6.20    < 0.2      < 0.2      O.OOE+OO    <  100 '*    <  100        < 0.2 11:30  03:30    242.67    6.25    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:45  03:45    241.89    6.30    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 12:00  04:00    241.11    6.36    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 22:00  14:00    210.00    a.so    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2
                            *** NOTE    Waist and ground level readings are the same.
0 N
 
                                    ***** Salem Generating Station Plume Data *****
06/23/93                                                  593-03 Location    Centerline                          Meters      3218                                Miles    2.00 Survey Instrument                    Gross Readings                    Particulate  Iodine-131 Field    Net          Net Open      Closed        Team    C.P.M.        C.P.M.      Thyroid Wind  Wind      Window      Window    Exposure  Assumes      Assumes    Inhalation Real  Drill    Dir  Speed  Beta/Gamma    Gamma        Rate  10 Cu.Ft &  io cu.Ft & Dose Rate Time    Time    &deg; From  MPH      (mRad/hr)    (mR/hr)    (mR/min)  10% Eff. 0.2% Eff.    (mRem/hr) 08:00  00:00    296.00  5.50    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09120  01:20    289.00  5.79    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09:30  01:30    286.50  5.82    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09:45  01:45    279.50  5.88  1.58E+OO    1.26E+OO      2.lOE-02    <  100      <  100        < 0.2 10100  02:00    266.00  5.93  1.21E+OO    9.70E-Ol      1.62E-02    <  100      <  100        < 0.2 10115  02:15    258.00  5.98  2.SOE-01    2.00E-01      3.33E-03    <  100      <  100        < 0.2 10130  02:30    250.00  6.04    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 10145  02:45    245.00  6.09    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:00  03100    244.22  6.14    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11115  03115    243.44  6.20    < 0.2      < 0.2      O.OOE+OO    <  100 '*  <  100        < 0.2 11130  03130    242.67  6.25    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11145  03:45    241.89  6.30    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 12:00  04100    241.11  6.36    < 0.2      .< 0.2      O.OOE+OO    <  100      <  100        < o. 2 22100  14:00  210.00    a.so    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2
                          *** NOTE : Waist and ground level readings are the same .
0 N
N L
 
                                        ***** Salem Generating Station Plume Data *****
06/23/93                                                  S93-03 Location        Centerline                            Meters    4827                                  Miles    3.00 Survey Instrument                  Gross Readings                    Particulate  Iodine-131 Field    Net            Net Open      Closed      Team    C.P.M.        C.P.M.      Thyroid Wind    Wind      Window      Window    Exposure  Assumes      Assumes      Inhalation Real  Drill      Dir    Speed  Beta/Gamma    Gamma        Rate  10 Cu.Ft &. 10 Cu.Ft & Dose Rate Time    Time    0
                              -From  MPH      (mRad/hr)    (mR/hr)  (mR/min)  10% Eff. 0.2% Eff.    (mRem/hr) 08:00  00:00    296.00    5.50    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09:20  01:20    289.00    5.79    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09:30  01:30    286.50    5.82    < 0.2      <0.2      O.OOE+OO    <  100      <  100        < 0.2 09:45  01:45    279.50    5.88    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 10:00  02:00    266.00    5.93  1.06E+OO    8.SOE-01    1.42E-02    <  100      <  100        < 0.2 10:15  02:15    258.00    5.98  8.lOE-01    6.SOE-01    1.0SE-02    <  100      <  100        < 0.2 10:30  02:30    250.00    6.04    < 0.2      < 0.2 :    O.OOE+OO    <  100      <  100        < 0.2 10:45  02:45    245.00    6.09    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:00  03:00    244.22    6.14    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:15  03:15    243.44    6.20    < 0.2      < 0.2      O.OOE+OO    <  100 '*    <  100        < 0.2 11:30  03:30    242.67    6.25    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:45  03:45    241.89    6.30    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 12:00  04:00    241.11    6.36    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 22:00  14:00    210.00    a.so    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2
                            *** NOTE    Waist and ground level readings are the same.
0 N
w
 
                                        ***** Salem Generating Station Plume Data *****
06/23/93                                                S93-03 Location      1 Centerline                          Meters    6436                                  Miles    4.00 Survey Instrument                  Gross Readings                  Particulate  Iodine-131 Field      Net            Net Open      Closed      Team      C.P.M.        C.P.M.      Thyroid Wind    Wind    Window*    Window    Exposure  Assumes      Assumes      Inhalation Real    Drill    Dir    Speed  Beta/Gamma  Gamma        Rate    10 Cu.Ft &  10 Cu.Ft &    Dose Rate Time    Time  &deg; From  MPH    (mRad/hr)    (mR/hr)  (mR/min)  10% Eff. 0.2% Eff.    (mRem/hr) 00:00    296.00    s.so    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 08:00 01120    289.00    5.79    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09120 01130    286.50    5.82    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09130 01:45    279.50    5.88    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09145 02100  266.00    5.93  7.90E-01  6.30E-01    1.0SE-02    <  100      <  100        < 0.2 10100 02115  258.00    5.98  6.00E-01  4.BOE-01    8.00E-03    <  100      <  100        < 0.2 10115 02130  250.00    6.04    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 10130 02145  245.00    6.09    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 10145 03100  244.22    6.14    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11100 03115  243.44    6.20    < 0.2      < 0.2      O.OOE+OO    <  100 ..    <  100        < 0.2 11115 242.67    6.25    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11130  03130 03145  241.89    6.30    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11145 04100  241.11    6.36    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 12100 14:00  210.00    a.so    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 22100
                            *** NOTE 1 Waist and ground level readings are the same
* 0 N
 
                                      ***** Salem Generating Station Plume Data *****
06/23/93                                                  593-03 Location      Centerline                            Meters    8045                                Miles    5.00 Survey Instrument                  Gross Readings                  Particulate  Iodine-131 Field    Net          Net Open      Closed        Team    C.P.M.        C.P.M.      Thyroid Wind    Wind    Window    Window    Exposure  Assumes      Assumes    Inhalation Real  Drill    Dir    Speed  Beta/Gamma  Gamma        Rate  10 Cu.Ft &  10 Cu.Ft & Dose Rate Time    Time    &deg; From    MPH    (mRad/hr)    (mR/hr)  (mR/min)  10% Eff. 0.2% Eff.    (mRem/hr) 08:00  00:00    296.00    5.50    < 0.2      < 0.2      O.OOE+OO    <  100      < 100          < 0.2 09:20  01:20    289.00    5.79    < 0.2      < 0.2      O.OOE+OO    <  100      < 100          < 0.2 09:30  01:30    286.50    5.82    < 0.2      < 0.2      O.OOE+OO    <  100      < 100        < 0.2 09:45  01:45    279.50    5.88    < 0.2      < 0.2      O.OOE+OO    <  100      < 100        < 0.2 10:00  02:00    266.00    5.93    < 0.2      < 0.2      O.OOE+OO    <  100      < 100        < 0.2 10:15  02:15    258.00    5.98  5.00E-01  3.BOE-01    6.33E-03    <  100      < 100        < 0.2 10:30  02:30    250.00    6.04  4.00E-01  3.00E-01    5.00E-03    <  100      < 100        < 0.2 10:45  02:45    245.00    6.09    < 0.2      < 0~2      O.OOE+OO    <  100      < 100        < 0.2 11100  03:00    244.22    6.14    < 0.2      < 0.2      O.OOE+OO    <  100.    < 100          < 0.2 11115  03:15    243.44    6.20    < 0.2      < 0.2      O.OOE+OO    <  100 ii    < 100        < 0.2 11:30  03130    242.67    6.25    < 0.2      < 0.2      O.OOE+OO    <  100      < 100        < 0.2 11145  03145    241.89    6.30    < 0.2      < 0.2      O.OOE+OO    <  100      < 100          < 0.2 12100  04100    241.11    6.36    < 0.2      < 0.2      O.OOE+OO    <  100      < 100        < 0.2 22:00  14:00    210.00    a.so    < 0.2      < 0.2      O.OOE+OO    <  100      < 100        < 0.2
                          *** NOTE    Waist and ground level readings are the same.
0 N
U1
 
                                    ***** Salem Generating Station Plume Data *****
06/23/93                                                  S93-03 Location    centerline                            Meters      9654                                Miles    6.00 Survey Instrument                    Gross Readings                    Particulate  Iodine-131 Field    Net          Net Open      Closed      Team      C.P.M.      C.P.M.      Thyroid Wind    Wind    Window      Window    Exposure  Assumes      Assumes    Inhalation Real    Drill    Dir    Speed  AF.!ta/Gamma  Gamma        Rate    10 Cu.Ft &  10 Cu.Ft &  Dose Rate Time    Time  &deg; From  MPH    (mRad/hr)      (mR/hr)  (mR/min)  10\ Eff. 0.2\ Eff.    (mRem/hr) 08:00  00:00  296.00    5.50    < 0.2        < 0.2      O.OOE+OO    < 100      <  100        < 0.2 09120  01:20  289.00    5.79    < 0.2        < 0.2      O.OOE+OO    < 100      <  100        < 0.2 09130  01:30  286.50    5.82    < 0.2        < 0.2      O.OOE+OO    < 100      <  100        < 0.2 09:45  01:45  279.50    5.88    < 0.2        < 0.2      O.OOE+OO    < 100      <  100        < 0.2 10100  02:00  266.00    5.93    < 0.2        < 0.2      O.OOE+OO    < 100      <  100        < 0.2 10115  02:15  258.00    5.98    < 0.2        < 0.2      O.OOE+OO    < 100      <  100        < 0.2 10130  02:30  250.00    6.04  5.00E-01    3.BOE-01    6.33E-03    < 100      <  100        < 0.2 10145  02:45  245.00    6.09  4.00E-01    3.00E-01    5.00E-03    < 100      <  100        < 0.2 11:00  03:00  244.22    6.14    < 0.2        < 0.2      O.OOE+OO    < 100      <  100        < 0.2 11:15  03:15  243.44    6.20    < 0.2        < 0.2      O.OOE+OO    < 100 **.  <  100        < 0.2 11:30  03:30  242.67    6.25    < 0.2        < 0.2      O.OOE+OO    < 100      <  100        < 0.2 11145  03:45  241.89    6.30    < 0.2        < 0.2      O.OOE+OO    < 100      <  100        < 0.2 12100  04:00  241.11    6.36    < 0.2        < 0.2      O.OOE+OO    < 100      <  100        < 0.2 22100  14:00  210.00    a.so    < 0.2        < 0.2      O.OOE+OO    < 100      <  100        < 0.2
                          *** NOTE : Waist and ground level readings are the same
* 0 N
O'I
 
                                      ***** Salem Generating station Plume Data *****
06/23/93                                                  S93-03 Location    Centerline                            Meters    11263                                  Miles    7.00 Survey Instrument                  Gross Readings                  Particulate  Iodine-131 Field    Net            Net open      Closed        Team    C.P.M.        C.P.M.      Thyroid Wind    Wind      Window    Window    Exposure  Assumes      Assumes      Inhalation Real  Drill    Dir    Speed    Beta/Gamma  Gamma        Rate  10 Cu.Ft &  10 Cu.Ft & Dose Rate Time    Time    &deg; From    MPH      (mRad/hr)    (mR/hr)  (mR/min)  10% Eff. 0.2% Eff.    (mRem/hr) 08:00  00:00    296.00    5.50    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09:20  01:20    289.00    5.79    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09:30  01:30    286.50    5.82    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 09:45  01:45    279.50    5.88    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 10:00  02:00    266.00    5.93    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 10:15  02:15    258.00    5.98    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 10:30  02:30    250.00    6.04' 4.00E-01    3.00E-01    5.00E-03    <  100      <  100        < 0.2 10:45  02:45    245.00    6.09    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:00  03:00    244.22    6.14    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:15  03:15    243.44    6.20    < 0.2      < 0.2      O.OOE+OO    <  100.;,  <  100        < 0.2 11:30  03:30    242.67    6.25    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 11:45  03:45    241.89    6.30    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 12:00  04:00    241.11    6.36    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2 22:00  14:00    210.00    a.so    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        < 0.2
                          *** NOTE    Waist and ground level readings are the same.
0 N
    ".J
 
                                  ***** Salem Generating station Plume Data *****
06/23/93                                                893-03 Location  Centerline                            Meters  12872                                Miles    8.00 Survey Instrument                  Gross Readings                  Particulate  Iodine-131 Field    Net          Net Open      Closed      Team      C.P.M.      C.P.M.      Thyroid Wind    Wind    Window      Window    Exposure  Assumes    Assumes      Inhalation Real  Drill    Dir    Speed  Beta/Gamma    Gamma      Rate    10 Cu.Ft &  10 cu.Ft & Dose Rate Time    Time  &deg; From  MPH    (mRad/hr)    (mR/hr)  (mR/min)  10% Eff. 0.2% Eff.    (mRem/hr) 08:00  00:00    296.00    5.50    <  0.2      < 0.2    O.OOE+OO    <  100      <  100        < 0.2 09:20  01:20    289.00    5.79    <  0.2      < 0.2    O.OOE+OO    <  100      <  100        < 0.2 09:30  01:30    286.50    5.82    <  0.2      < 0.2    O.OOE+OO    <  100      <  100        < 0.2 09:45  01:45    279.50    5.88    <  0.2      < 0.2    O.OOE+OO    <  100      <  100        < 0.2 10:00  02:00    266.00    5.93    <  0.2      < 0.2    O.OOE+OO    <  100      <  100        < 0.2 10:15  02:15    258.00    5.98    <  0.2      < 0.2. O.OOE+OO    <  100      <  100        < 0.2 10:30  02:30    250.00    6.04    <  0.2      < 0.2    O.OOE+OO    <  100      <  100        < 0.2 10:45  02:45    245.00    6.09  4.00E-01  3.00E-01    5.00E-03    <  100      <  100        < 0.2 11:00  03:00    244.22    6.14    < 0.2      < 0.2    O.OOE+OO    <  100.    <  100        < 0.2 11:15  03:15    243.44    6.20    < 0.2      < 0.2    O.OOE+OO    <  100 ~    <  100        < 0.2 11:30  03:30    242.67    6.25    < 0.2      < 0.2    O.OOE+OO    <  100      <  100        < 0.2 11:45  03:45    241.89    6.30    < 0.2      < 0.2    O.OOE+OO    <  100      <  100        < 0.2 12:00  04:00    241.11    6.36    < 0.2      < 0.2    O.OOE+OO    <  100      <  100        < 0.2 22:00  14:00    210.00    a.so    < 0.2      < 0.2    O.OOE+OO    <  100      <  100        < 0.2
                        *** NOTE : Waist and ground level readings are the same .
0 N
c:o
 
                                          ***** Salem Generating Station Plume Data *****
06/23/93                                                    593-03 Location    1 Centerline                              Meters : 14481                                  Miles    9.00 Survey Instrument                  Gross Readings                  Particulate  Iodine-131 Field      Net          Net Open      Closed      Team      C.P.M.      C.P.M.      Thyroid Wind      Wind    Window    Window    Exposure    Assumes      Assumes    Inhalation Real  Drill    Dir      Speed  Beta/Gamma  Gamma        Rate    10 Cu.Ft &  10 Cu.Ft & Dose Rate Time    Time  &deg; From      MPH    (mRad/hr)    (mR/hr)  (mR/min)    10\ Eff. 0.2\ Eff.    (mRem/hr) 08:00  00:00    296.00      5.50    < 0.2      < 0.2    O.OOE+OO      <  100      <  100        < 0.2 09:20  01:20    289.00      5.79    < 0.2      < 0.2    O.OOE+OO      <  100      <  100        < 0.2 09:30  01:30    286.50      5.82    < 0.2      < 0.2    O.OOE+OO      <  100      <  100        < 0.2 09:45  01:45    279.50      5.88    < 0.2      < 0.2    O.OOE+OO      <  100      <  100        < 0.2 10100  02100    266 .* 00    5.93    < 0.2      < 0.2    O.OOE+OO      <  100      <  100        < 0.2 10115  02:15    258.00      5.98    < 0.2      < 0.2    O.OOE+OO      <  100      <  100        < 0.2 10130  02:30    250.00      6.04    < 0.2      < 0.2    O.OOE+OO      <  100      <  100        < 0.2 10:45  02145    245.00      6.09    < 0.2      < 0.2    O.OOE+OO      <  100      <  100        < 0.2 11100  03:00    244.22      6.14  3.20E-01  2.60E-Ol    4.33E-03      <  100.    <  100        < 0.2 11115  03115    243.44      6.20    < 0.2      < 0.2    O.OOE+OO      <  100 ii  <  100        < 0.2 11130  03130    242.67      6.25    < 0.2      < 0.2    O.OOE+OO      <  100      <  100        < 0.2 11:45  03145    241.89      6.30    < 0.2      < 0.2    O.OOE+OO      <  100      <  100        < 0.2 12:00  04100    241.11      6.36    < 0.2      < 0.2    O.OOE+OO      <  100      <  100        < 0.2 22100  14:00    210.00      8.50    < 0.2      < 0.2    O.OOE+OO      <  100      <  100        < 0.2
                            ***    NOTE : Waist and ground level readings are the same
* 0 N
ID
 
                                    ***** Salem Generating Station Plume Data *****
06/23/93                                                  S93-03 Location    Centerline                            Meters    16090                                Miles    10.00 Survey Instrument                  Gross Readings                  Particulate  Iodine-131 Field    Net          Net Open      Closed      Team      C.P.M.      C.P.M.      Thyroid Wind    Wind    Window    Window    Exposure  Assumes    Assumes      Inhalation Real  Drill      Dir    Speed  Beta/Gamma  Gamma        Rate    10 cu.Ft &  10 Cu.Ft & Dose Rate Time    Time  0
                          -From  MPH    (mRad/hr)    (mR/hr)  (mR/min)  10% Eff. 0.2% Eff.    (mRem/hr) 08:00  00:00    296.00    5.50    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        <  0.2 09:20  01:20    289.00    5.79    < 0.2      < 0.2      O.OOE+OO    <  100    <  100        <  0.2 09:30  01:30    286.50    5.82    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        <  0.2 09:45  01:45    279.50    5.88    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        <  0.2 10:00  02:00    266.00    5.93    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        <  0.2 10:15  02:15    258.00    5.98    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        <  0.2 10:30  02:30    250.00    6.04    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        <  0.2 10:45  02:45    245.00    6.09    < 0.2      < 0~2      O.OOE+OO    <  100      <  100        <  0.2 11:00  03:00    244.22    6.14  2.80E-01  2.30E-01    3.83E-03    <  100      <  100        <  0.2 11:15  03:15    243.44    6.20    < 0.2      < 0.2      O.OOE+OO    <  100 "    <  100        <  0.2 11:30  03:30    242.67    6.25    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        <  0.2 11:45  03:45    241.89    6.30    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        <  0.2 12:00  04:00    241.11    6.36    < 0.2      < 0.2      O.OOE+OO    <  100    .<  100        <  0.2 22:00  14:00    210.00    8.50    < 0.2      < 0.2      O.OOE+OO    <  100      <  100        <  0.2
                        *** NOTE    Waist and ground level readings are the same.
0 N
0
 
              ;'
                                        *****        Salem Generating Station Plume Data *****
06/23/93                                                                      593-03 Location    El                                                    Meters    1448                                    Miles    0.90 Survey Instrument                            Gross Readings                        Particulate  Iodine-131 Field      Net          Net Open          Closed        Team      C.P.H.        C.P.H.      Thyroid Wind      Wind              Window            Window      Exposure    Assumes      Assumes    Inhalation Real  Drill    Dir      Speed            Beta/Gamma          Gamma          Rate    10 Cu.Ft &  10 Cu.Ft & Dose Rate Time    Time  0 From    MPH              (mRad/hr)          (mR/hr)    (mR/min)    10% Eff. 0.2% Eff.    (mRem/hr) 08:00  00:00  296.00      5.50          O.OOE+OO        O.OOE+OO      .O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 09:20  01:20  289.00      s .. 79        O.OOE+OO        O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 09:30  01:30  286.50      5.82          3.00E-01        2.40E-Ol      4.00E-03      < 100        < iOO        < 0.2 09:45  01:45  279.50      5.88          O.OOE+OO        O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 10:00  02:00  266.00      5.93          O.OOE+OO        O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 10:15  02:15  258.00      5.98          O.OOE+OO        O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 10:30  02:30  250.00      6.04          O.OOE+OO        O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 10:45  02:45  245.00      6.09          O.OOE+OO        O.OOE+OO      O.OOE+OO . O.OOE+OO    O.OOE+OO      O.OOE+OO 11:00  03:00  244.22      6.14          O.OOE+OO        O.OOE+OO      O~OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 11:15  03:15  243.44      6.20          O.OOE+OO        O.OOE+OO      O.OOE+OO    O.OOE+OO'*  O.OOE+OO      O.OOE+OO 11:30  03:30  242.67      6.25          O.OOE+OO        O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 11:45  03:45  241. 89      6.30          O.OOE+OO        O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 12:00  04:00  241.11      6.36          O.OOE+OO        O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 22:00  14:00  210.00      a.so          O.OOE+OO        O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO
                        ***  NOTE    Waist and ground level readings are the same.
0 w
N
                                          .. "\*--:    :* J j'* *.                                      ''(.
 
                                        ***** Salem Generating Station Plume Data *****
06/23/93                                                      S93-03 Location        AI-1                                  Meters    1448                                  Miles    0.90 survey Instrument                    Gross Readings                    Particulate    Iodine-131 Field        Net          Net Open      Closed        Team      C.P.M.        C.P.M.      Thyroid Wind    Wind      Window    Window    Exposure    Assumes      Assumes    Inhalation Real    Drill    Dir    Speed    Beta/Gamma    Gamma        Rate  - 10 Cu. Ft &  10 Cu.Ft & Dose Rate Time      Time  &deg; From    MPH      (mRad/hr)    (mR/hr)    (mR/min)    10% Eff. 0.2% Eff.    (mRem/hr) 08:00    00:00  296.00    5.50 O.OOE+OO    O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 09:20    01:20  289.00    5.79
* 0. OOE+OO  O.OOE+OO      O~OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 09:30    01:30  286.50    5.82 3.00E-01    2.40E-01      4.00E-03        < 100      < 100        < 0.2 09:45    01:45  279.50    5.88 O.OOE+OO    O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 10:00    02:00  266.00    5.93 O.OOE+OO    O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 10:15    02:15  258.00    5.98 O.OOE+OO    O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 10:30    02:30  250.00    6.04 O.OOE+OO    O.OOE+OO      O.OOE+OO. O.OOE+OO    O.OOE+OO      O.OOE+OO 10:45    02:45  245.00    6.09 O.OOE+OO    O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 11:00    03:00  244.22    6.14 O.OOE+OO    O.OOE+OO      O.OOE+OO    O.OOE+OO.*  O.OOE+OO      O.OOE+OO 11: 15  03:15  243.44    6.20 O.OOE+OO    O.OOE+OO      O.OOE+OO    O.OOE+OO-ti O.OOE+OO      O.OOE+OO 11:30    03:30  242.67    6.25 O.OOE+OO    O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 11:45    03:45  241.89    6.30 O.OOE+OO    O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 12:00    04:00  241.11    6.36 O.OOE+OO    O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO 22100    14:00  210.00    8.50 O.OOE+OO    O.OOE+OO      O.OOE+OO    O.OOE+OO    O.OOE+OO      O.OOE+OO
                            *** NOTE    Waist and ground level readings are the same.
w 0
l
 
I
                                                *****      Salem Generating Station Plume Data *****
06/23/93                                                                    S93-03 Location      ENE7                                                  Meters    9493                                    Miles      5.90 Survey Instrument                        Gross Readings                        Particulate  Iodine-131 Field          Net        Net Open      Closed        Team          C.P.M*      C.P.M.      Thyroid Wind        Wind            Window    Window    Exposure        Assumes    Assumes    Inhalation Real    Drill        Dir        Speed.        Beta/Gamma    Gamma        Rate      10 Cu.Ft &  10 Cu.Ft & Dose Rate Time    Time        &deg; From      MPH            (mRad/hr)  (mR/hr)    (mR/min)        10% Eff. 0.2% Eff.    (mRem/hr) 08:00  00:00        296.00        5.50        O.OOE+OO O.OOE+OO        O.OOE+OO        O.OOE+OO  O.OOE+OO      O.OOE+OO 09:20  01:20        289.00        5.79        O.OOE+OO O.OOE+OO        O.OOE+OO        O.OOE+OO  O.OOE+OO      O.OOE+OO 09:30  01:30        286.50        5.82        O.OOE+OO O.OOE+OO        O.OOE+OO        O.OOE+OO  O.OOE+OO      O.OOE+OO 09:45  01:45        279.50        5.88        O.OOE+OO O.OOE+OO        O.OOE+OO        O.OOE+OO  O.OOE+OO      O.OOE+OO 10:00  02:00        266.00        5.93        O.OOE+OO .O.OOE+OO      O.OOE+OO        O.OOE+OO  O.OOE+OO      O.OOE+OO 10:15  02:15        258.00        5.98        O.OOE+OO
* O.OOE+OO      O.OOE+OO        O.OOE+OO  O.OOE+OO      O.OOE+OO 10:30  02:30        250.00        6.04        O.OOE+OO O.OOE+OO        O.OOE+OO        O.OOE+OO  O.OOE+OO      O.OOE+OO 10:45  02:45        245.00        6.09        3.00E-01 2.00E-01        3.33E-03          < 100      < 100        < 0.2 11:00  03:00        244.22        6.14            < 0.2      < 0.2      O.OOE+OO          < 100      < 100        < 0.2 11:15  03:15        243.44        6.20            < 0.2      < 0.2      O.OOE+OO      .. < 100 *.    < 100        < 0.2 11:30  03:30        242.67        6.25        O.OOE+OO O.OOE+OO        O.OOE+OO        O.OOE+OO  O.OOE+OO      O.OOE+OO 11:45  03:45        241.89        6.30        O.OOE+OO O.OOE+OO        O.OOE+OO        O.OOE+OO  O.OOE+OO      O.OOE+OO 12:00  04:00        241.11        6.36        O.OOE+OO O.OOE+OO        O.OOE+OO        O.OOE+OO  O.OOE+OO      O.OOE+OO 22:00  14:00        210.00        a.so        O.OOE+OO O.OOE+OO        O.OOE+OO        O.OOE+OO  O.OOE+OO      O.OOE+OO
                                ***    NOTE    Waist and ground level readings are the            ,s~me.i 0
w ti' ti
                        *~* .*    *.r*
                                              .  .. " -~*
 
                                        ***** Salem Generating Station Plume Data *****
I 06/23/93                                                              593-03 Location      AI-8                                    Meters    5310                                              Miles    3.J Survey Instrument                          Gross Readings                        Particulate          Iodine-131 Field            Net                Net Open      Closed      Team            C.P.M.            C.P.M.      Thyroid Wind    Wind      Window      Window    Exposure        Assumes            Assumes    Inhalation Real    Drill      Dir    Speed    Beta/Gamma    Gamma        Rate        10 Cu.Ft &*        10 cu.Ft & Dose Rate Time    Time    0 From  MPH      (mRad/hr)    (mR/hr) * *(mR/min)'  -e  i'o'%':Ett.      0.2%
                                                                                                        -- - . - Eff.  (mRem/hr)
                                                                                                  ~
08:00  00:00    296.00    5.50  O.OOE+OO    O.OOE+OO    O.o'OE+OO        0. 0-0E'.f.OO      O.OOE+O.O      O.OOE+OO 09:20  01:20    289.00    5.79  O.OOE+OO    O.OOE+OO    O.OOE+OO        o.ooE!+oo          O.OOE+OO      O.OOE+OO 09:30  01:30    286.50    5.82  O.OOE+OO    O.OOE+OO    O.OOE+OO        O.OOE+OO          O.OOE+OO      O.OOE+OO 09:45  01:45    279.50    5.88  O.OOE+OO    O.OOE+OO    O.OOE+OO        o.ooit+oo          O.OOE+OO      O.OOE+OO
                                                                                  '    O.OOE+OO
                                                                                                      "  O.OOE+OO      O.OOE+OO 10:00  02:00    266.00    5.93  4.00E-01    3.00E-01    5.00E-03 10:15  02:15    258.00    5.98  O.OOE+OO    O.OOE+OO    O.OOE+OO        O.OOE+OO          O.OOE+OO      O.OOE+OO 10130  02:30    250.00    6.04  O.OOE+OO    O.OOE+OO    O.OOE+OO        O.OOE+OO          O.OOE+OO      O.OOE+OO 10145  02:45    245.00    6.09  O.OOE+OO    O.OOE+OO    O.OOE+OO        O.OOE+oo          O.OOE+OO      O.OOE+OO 11100  03:00    244.22    6.14  O.OOE+OO    O.OOE+OO    O.OOE+OO        O. OOE+OO~        O.OOE+OO      O.OOE+OO 11:15  03:15    243.44    6.20  O.OOE+OO    O.OOE+OO    O.OOE+OO        O.OOE+OO          O.OOE+OO      O.OOE+OO 11:30  03:30    242.67    6.25  O.OOE+OO    O.OOE+OO    O.OOE+OO        O.OOE+OO          O.OOE+OO      O.OOE+OO 11145  03:45    241.89    6.30  O.OOE+OO    O.OOE+OO    O.OOE+OO        O.OOE+OO          O.OOE+OO      O.OOE+OO 12:00  04:00    241.11    6.36  O.OOE+OO    O.OOE+OO    O.OOE+OO        O.OOE+OO          O.OOE+OO      O.OOE+OO 22:00  14:00  . 210. 00    8.50  O.OOE+OO    O.OOE+OO    O.OOE+OO        O.OOE+OO          O.OOE+OO      O.OOE+OO
                            *** NOTE    Waist and ground level readings are the same.
  ..w....
0 w
                                                                                                                                  \
 
06/23/93
                                        ***** Salem Generating Station Plume Data *****
S93-03 Location      centerline                                Meters      24135                                                                            Miles      15.00 Survey Instrument                                  Gross Readings                              Particulate                              Iodine-131 Field                  Net                                    Net Open        Closed      Team                C.P.M.                                  C.P.M.            Thyroid Wind. Wind      Window        Window    Exposure            Assumes                                  Assumes            Inhalation Real    Drill      Dir  Speed  Beta/Gamma        Gamma        Rate            10 Cu.Ft &                              10 Cu.Ft & Dose Rate Time      Time    0 From  MPH      (mRad/hr)        (mR/hr)  (mR/min)            10% Eff.                              0.2% Eff.            (mRem/hr) 08:00    00:00    296.00    5.50      <  d.2        <  0.2    O.OOE+OO                  <      100                          < 100                <  0.2 09:20    01:20    289.00    5.79    <  0.2        <  0.2    O.OOE+OO                  <      100                          < 100                <  0.2 09:30    01:30    286.50    5.82      <  0.2        <  0.2    O.OOE+OO                  <      100                          < 100                <  0.2 09:45    01:45    279.50    5.88    <  0.2        <  0.2    O.OOE+OO                  <      100                          < 100                <  0.2 10:00    02:00    266.00    5.93    <  0.2        <  0.2    O.OOE+OO                  <      100                          < 100                <  .0. 2 10: 15  02:15    258.00    5.98    <  0.2        <  0.2    O.OOE+OO                  <      100                          < 100                <  0.2 10:30    02:30    250.00    6.04    <  0.2        <  0.2    O.OOE+OO                  <      100                          < 10.0          ..
                                                                                                                                                                <  0.2
                                                                                                                                      ;
10:45    02:45    245.00    6.09    <  0.2        <  0.2    O.OOE+OO                '<        100                          < 100                <  0.2 11:00    03:00    244.22    6.14    <  0.2        <  0.2    O.OOE+OO                  <      100                          < 100                <  0.2 11: 15  03:15    243.44    6.20    <  0.2        <  0.2    O.OOE+OO '        ., '< 100.                  '              < 100                <  0.2 11:30    03:30 '  242.67    6.25    <  0.2        <  0.2    O.OOE+OO '              **<**100                                < 100                <  0.2 11:45    03:45    241.89    6.30  .- "<  0.2        <  0.2    O.OOE+OO '        t 1 **~"ioo
: r. .  < 100                <  0.2 12:00    04:00    241.11    6.36    <  0.2        <  0.2    O.OOE+OO          r*    '<      "100                          *<  100              <  0.2 22:00    14:0.0    210.00    a.so    <  0.2        <  0.2    O.OOE+OO
                                                                                                      *~. '100'
                                                                                                                                          '<-' 100--        -- <  0.2 Waist and ground level readlDgs .are the 6'afue ~ it                1                                  **. ~- .                    *'
                              ***NOTE                                                        !*'        1l.  !* .;.                                                  i ~
* 0                                                                                ii.        .  .. ~-  .  ......
N
 
MET FORECAST DATA JUNE 23, 1993 TIME : 08:00 - 22:00 WEATHER FORECAST FROM NOAA General Forecast:
3 Winds from the West North West 15 to 10      mph this morning and temperatures in the mid to high 70's.
Present Temperature and Wind Information:
Winds from 296 degrees , 1 .
2 Temperature is 75 degrees F Wind speed is 6 mph , 3 Extended Period Forecast:
Weather conditions should be stable for the next few days as a high pressure system remains in the Delaware Valley area.
Expect clear skies with temperatures in the mid to high 70's for the next few days.
Winds should shift from the South South West at 5 to 10 mph this morning and should remain that way for the next several days.
======================================================================
CONTROLLER INFORMATION WO Degriaes                Generic Name 348.75 to 11.25            N 11.25 to 33.75            NNE
* 33.75 to* 56.25          NE 56.25 to 78.75            ENE 78.25 to 101.25          E 101.25 to 123.75          ESE 123.75 to 146.25          SE 146.25 to 168.75          SSE 168.75 to 191.25          S 191.25 to 213.75          SSW 213.75 to 236.25          SW 236.25 to 258.75          WSW 258.75 to 281.25          W 281.25 to 303.75          WNW 303.75 to 326.25          NW 326.25 to 348.75          NNW The controller may vary the information listed below at anytime.
2 Temperature may vary + or - 5 degrees.
3 Wind speed may vary + or - o.s miles per hour~
10.4.1}}

Latest revision as of 01:59, 6 January 2025

Artificial Island Emergency Plan,Annual Graded Exercise, S93-03
ML18100A433
Person / Time
Site: Salem, Hope Creek  
Issue date: 06/23/1993
From:
Public Service Enterprise Group
To:
References
NUDOCS 9307010018
Download: ML18100A433 (345)


Text