ML18101A859: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.e Public Service Electric and Gas Company Leon R. Eliason                   Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1100 Chief Nuclear Officer & President Nuclear Business Unit JUL 271995 LR-N95108 U.S. Nuclear Regulatory Commission Attention:               Document Control Desk Washington, DC               20555 Gentlemen:
{{#Wiki_filter:.e Public Service Electric and Gas Company Leon R. Eliason Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1100 Chief Nuclear Officer & President Nuclear Business Unit JUL 271995 LR-N95108 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555 Gentlemen:
SEMI-ANNUAL REPORT OF FITNESS FOR DUTY (FFD) PERFORMANCE DATA SALEM AND HOPE CREEK GENERATING STATIONS DOCKET NOS. 50-272, 50-311, AND 50-354 In accordance with the requirements of 10CFR26.71(d), Public Service Electric and Gas Company (PSE&G), hereby, forwards the attached FFD Performance Data Report for the six month period ending June 30, 1995.
SEMI-ANNUAL REPORT OF FITNESS FOR DUTY (FFD) PERFORMANCE DATA SALEM AND HOPE CREEK GENERATING STATIONS DOCKET NOS. 50-272, 50-311, AND 50-354 In accordance with the requirements of 10CFR26.71(d), Public Service Electric and Gas Company (PSE&G), hereby, forwards the attached FFD Performance Data Report for the six month period ending June 30, 1995.
Should you have any questions regarding this report, we will be pleased to discuss them with you, Sincerely, Affidavit Attachment (1) 9508030146 950727 PDR ADOCK 05000272 R                         PDR
Should you have any questions regarding this report, we will be pleased to discuss them with you, Affidavit Attachment (1) 9508030146 950727 PDR ADOCK 05000272 R
PDR Sincerely,


Document Control Desk         NLR-N95108                                             JUL 2 71995 c   Mr. T. T. Martin, Administrator USNRC Region I Mr. L. Olshan USNRC Senior Licensing Project Manager - Salem Mr. D. Moran USNRC Licensing Project Manager - Hope Creek Mr. c. Marschall                                         (S09)
Document Control Desk NLR-N95108 2 -
USNRC Senior Resident Inspector Mr. R. Summers                                           (S09)
c Mr. T. T. Martin, Administrator USNRC Region I Mr. L. Olshan USNRC Senior Licensing Project Manager -
USNRC Senior Resident Inspector Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering New Jersey Department of Environmental Protection 95-4933 i.
Salem Mr. D. Moran USNRC Licensing Project Manager -
Hope Creek Mr. c. Marschall USNRC Senior Resident Inspector Mr. R. Summers USNRC Senior Resident Inspector Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering JUL 2 71995 (S09)
(S09)
New Jersey Department of Environmental Protection
: i.
95-4933  


REF: NLR-N95108 STATE OF NEW JERSEY       )
STATE OF NEW JERSEY COUNTY OF SALEM
                          ) SS.
)  
COUNTY OF SALEM          )
)
E. c. Simpson, being duly sworn according to law deposes and says:
SS.  
)
REF: NLR-N95108 E. c. Simpson, being duly sworn according to law deposes and says:
I am Senior Vice President - Nuclear Engineering of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter, referenced above, concerning our Fitness For Duty Program for the Salem and Hope Creek Generating Stations, are true to the best of my knowledge, information and belief.
I am Senior Vice President - Nuclear Engineering of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter, referenced above, concerning our Fitness For Duty Program for the Salem and Hope Creek Generating Stations, are true to the best of my knowledge, information and belief.
subscribed Land th~,, Ql]Th                       1995
subscribed Land th~,, Ql]Th 1995  


Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 Public Service Electric & Gas                                                 June 30, 1995 Company                                                         6 Months Ending Hancock's Bridge, NJ 08038 Location Ronald J. Mack, M.D.                                                           (609)339-5600 Contact Name                                                     Phone (include area code)
Public Service Electric & Gas Company Hancock's Bridge, NJ 08038 Location Ronald J. Mack, M.D.
Cutoffs: Screen/Confirmation (ng/ml)                                           Appendix to 10CFR 26 Marijuana       50/15               Amphetamines                   1000/500       N/A            I Cocaine*       300/150             Phencyclidine                       25/25     N/A            I Opiates       300/300             Alcohol (% BAC)                     0.04%     N/A            I Long-Term                  Short-Term TestinQ Results         Licensee Employees         Contractor Personnel        Contractor Personnel Average Number with Unescorted Access           2,359                       622                       360 Categories             #Tested     #Positive     #Tested       #Positive    #Tested      #Positive Pre-Access                   234         0             31           0           616          3 For Cause:
Contact Name Fitness for Duty Program Performance Data Personnel Subject to 1 OCFR26 Cutoffs: Screen/Confirmation (ng/ml)
Post Accident                 0         0               0           0              0          0 Observed Behavior             3         0               0           0              1          0 Random                       663         0             117           0            70          0 Follow-up                     22         0               0           0             0           0 Other                          0         0               0           0             0           0 Total                        922          0             148          0           687           3
Marijuana 50/15 Amphetamines 1000/500 Cocaine*
300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (% BAC) 0.04%
Long-Term TestinQ Results Licensee Employees Contractor Personnel Average Number with Unescorted Access 2,359 622 Categories  
#Tested  
#Positive  
#Tested  
#Positive Pre-Access 234 0
31 0
For Cause:
Post Accident 0
0 0
0 Observed Behavior 3
0 0
0 Random 663 0
117 0
Follow-up 22 0
0 0
Other 0
0 0
0 Total 922 0
148 0
June 30, 1995 6 Months Ending (609)339-5600 Phone (include area code)
Appendix to 1 OCFR 26 N/A I
N/A I
N/A I
Short-Term Contractor Personnel 360
#Tested
#Positive 616 3
0 0
1 0
70 0
0 0
0 0
687 3  


Breakdown of Confirmed Positive Tests for Specific Substances Amphe-   Phency-
Breakdown of Confirmed Positive Tests for Specific Substances Amphe-Phency-Refusal.to Marijuana Cocaine Opiates tamines clidine Alcohol Test 1
* Refusal.to Marijuana Cocaine     Opiates   tamines clidine Alcohol Test       1 2 3 4 5 Licensee Employees         0         0         0           0         0     010     0 Long-Term Contractors       0         0         0           0         0     010     0 Short-Term Contractors     2         2         0           o_       0     010     0               A Total                       2         2         0           0         0       0       0               4 I X/Y X=NRC Cutoff     Y=PSE&G Cutoff NRC     PSE&G Alcohol     0.04%   0.02%
2 3
4 5
Licensee Employees 0
0 0
0 0
010 0
Long-Term Contractors 0
0 0
0 0
010 0
Short-Term Contractors 2
2 0
o_
0 010 0
A Total 2
2 0
0 0
0 0
4 I
X/Y X=NRC Cutoff Y=PSE&G Cutoff NRC PSE&G Alcohol 0.04%
0.02%  
 
i L


==SUMMARY==
==SUMMARY==
OF MANAGEMENT ACTIONS Suspensions based on presumptive positives: 0 Reportable events: 0 Appeals/Resolutions: During the time period January 1, 1995 to June 30, 1995, eight appeals have been resolved. No appeals resulted in reversal of original action.
OF MANAGEMENT ACTIONS Suspensions based on presumptive positives: 0 Reportable events: 0 Appeals/Resolutions: During the time period January 1, 1995 to June 30, 1995, eight appeals have been resolved. No appeals resulted in reversal of original action.
* Four psychological appeals resulted from the determination that drug rehabilitation requirements had not. peen adequately met.
Four psychological appeals resulted from the determination that drug rehabilitation requirements had not. peen adequately met.
* One appeal resulted from an access denial based on a security determination of lack of trustworthiness and reliability.
One appeal resulted from an access denial based on a security determination of lack of trustworthiness and reliability.
* One appeal resulted from an access denial based on a psychological determination of lack of trustworthiness and reliability.
One appeal resulted from an access denial based on a psychological determination of lack of trustworthiness and reliability.  
  * . One Fitness-For-Duty appeal involved a claim that over the counter medications contributed to positive drug test results.
*. One Fitness-For-Duty appeal involved a claim that over the counter medications contributed to positive drug test results.
* One Fitness-For-Duty appeal involved an allegation that a procedural error occurred during the collection process.
One Fitness-For-Duty appeal involved an allegation that a procedural error occurred during the collection process.
Trends: 1990 to Present
Trends: 1990 to Present Opiates: No MRO positives since the Fitness-For-Duty rule went into effect.
  -*  Opiates: No MRO positives since the Fitness-For-Duty rule went into effect.
PCP: No positives for the third consecutive year.
* PCP: No positives for the third consecutive year.
Rare challenges to the accuracy and validity offfiIS laboratory test results.
* Rare challenges to the accuracy and validity offfiIS laboratory test results.
This is the first non-outage FFD 6 month report. Decreased numbers of short term contractors has resulted in the lowest positive rate in the pre-access category since the FFD rule went into effect.
* This is the first non-outage FFD 6 month report. Decreased numbers of short term contractors has resulted in the lowest positive rate in the pre-access category since the FFD rule went into effect.
Recommendations:
Recommendations:
* Eliminate the second breath alcohol test when the first test is negative.
Eliminate the second breath alcohol test when the first test is negative.
After greater than 76,000 breath tests, equipment sensitivity of 100% has been demonstrated (second breath test has never been positive after the first breath test was negative). Cost savings over months to years would be considerable.
After greater than 76,000 breath tests, equipment sensitivity of 100% has been demonstrated (second breath test has never been positive after the first breath test was negative). Cost savings over months to years would be considerable.
* Continue to permit/encourage on-site pre-screening.
Continue to permit/encourage on-site pre-screening.
* Consider moving toward "interchangeability" and mutual acceptance among regulated Fitness-F or-Duty programs (NRC, DOT, RSPA). .
Consider moving toward "interchangeability" and mutual acceptance among regulated Fitness-F or-Duty programs (NRC, DOT, RSPA).  
i


7/05/95                                       PUBLIC ~tHV!LC CLCLIKlL ~UM~ LUm~KNY NUCLEAR DE~ARTMENT I MEDICAL                                               ! .
7/05/95 CTGRY PRE-EMP!-OYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP
FITNESS-FDR-DUTY STATISTICS REPORT                                             .f FOR PERIOD:     01/01/95 THRU 06/30/95
*OTHER TOTAL PUBLIC  
                  ------PERMANENT EMPLOYEES------       -----SHORT-TERM CONTRACTORS----  -----LONG-TERM CONTRACTORS-----
~tHV!LC CLCLIKlL ~UM~ LUm~KNY NUCLEAR DE~ARTMENT I MEDICAL FITNESS-FDR-DUTY STATISTICS REPORT FOR PERIOD:
CTGRY    SCH ED   TEST POS % TEST % POS       SCH ED   TEST  POS % TEST  % POS  SCH ED      TEST POS % TEST % POS PRE-EMP!-OYMENT      81   81   0 100.00   o.oo             0     0   0   0.00   0.00       0        0  0  0.00  0.00 PRE-BADGING        153   153   0 100. 00 0.00           616   616   3 100.00   0.48     31      31  0 100.00 0.00 1.
01/01/95 THRU 06/30/95  
PERIODIC              0     0   0  0.00   0.00             0     0   0   0.00   0.00       0       0   0   0.00 0.00 FOR CAUSE            3    3  0 100. DO  0.00                         0 100.00   0.00       0        0  0  0.00 0.00 POST ACCIDENT        0     0   0   0.00   0.00             0     0   0  0.00    0.00       0       0   0   0.00 0.00 RANDOM            663    663  0 100.00   0.00             70    70    0 100.00   0.00     117      117  0 100.00 0.00 FOLLOW-UP            22    22  0 100.00   0.00             0     0   0   0.00   0.00       0       0   0   0.00 0.00
------PERMANENT EMPLOYEES------
  *OTHER                0     0   0   D.OD  0.00             0    0    0  0.00   0.00       0       0   0   0.00 0.00 TOTAL              922    922  0 100.00   0.00           687    687    3 100.00    0.43    148     148   0 100.00 0.00
-----SHORT-TERM CONTRACTORS----
SCH ED TEST POS % TEST  
% POS SCH ED TEST POS % TEST  
% POS 81 81 0 100.00 o.oo 0
0 0
0.00 0.00 153 153 0 100. 00 0.00 616 616 3 100.00 0.48 0
0 0
0.00 0.00 0
0 0
0.00 0.00 3
3 0 100. DO 0.00 0 100.00 0.00 0
0 0
0.00 0.00 0
0 0
0.00 0.00 663 663 0 100.00 0.00 70 70 0 100.00 0.00 22 22 0 100.00 0.00 0
0 0
0.00 0.00 0
0 0
D.OD 0.00 0
0 0
0.00 0.00 922 922 0 100.00 0.00 687 687 3 100.00 0.43
.f
-----LONG-TERM CONTRACTORS-----
SCH ED TEST POS % TEST
% POS 0
0 0
0.00 0.00 31 31 0 100.00 0.00
: 1. **
0 0
0 0.00 0.00 0
0 0
0.00 0.00 0
0 0
0.00 0.00 117 117 0 100.00 0.00 0
0 0
0.00 0.00 0
0 0
0.00 0.00 148 148 0 100.00 0.00  


PUBLIC SERVICE ELECTRIC & GAS COMPANY         PAGE NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST  
PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST  


==SUMMARY==
==SUMMARY==
BY SUBSTANCE FOR PERIOD:   01/01/95 THRU   06/30/95 SUBSTANCE         OCCURANCES MARIJUANA                           2 COCAINE                             2
BY SUBSTANCE FOR PERIOD:
*** TOTAL ***                     4 *
01/01/95 THRU 06/30/95 SUBSTANCE OCCURANCES MARIJUANA 2
*One person tested positive for two substances}}
COCAINE 2  
*** TOTAL ***
4 *  
*One person tested positive for two substances PAGE}}

Latest revision as of 01:17, 6 January 2025

Forwards semi-annual Rept of Fitness for Duty Performance Data for Six Month Period Ending 950630
ML18101A859
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 07/27/1995
From: Eliason L
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LR-N95108, NUDOCS 9508030146
Download: ML18101A859 (8)


Text

.e Public Service Electric and Gas Company Leon R. Eliason Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1100 Chief Nuclear Officer & President Nuclear Business Unit JUL 271995 LR-N95108 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555 Gentlemen:

SEMI-ANNUAL REPORT OF FITNESS FOR DUTY (FFD) PERFORMANCE DATA SALEM AND HOPE CREEK GENERATING STATIONS DOCKET NOS. 50-272, 50-311, AND 50-354 In accordance with the requirements of 10CFR26.71(d), Public Service Electric and Gas Company (PSE&G), hereby, forwards the attached FFD Performance Data Report for the six month period ending June 30, 1995.

Should you have any questions regarding this report, we will be pleased to discuss them with you, Affidavit Attachment (1) 9508030146 950727 PDR ADOCK 05000272 R

PDR Sincerely,

Document Control Desk NLR-N95108 2 -

c Mr. T. T. Martin, Administrator USNRC Region I Mr. L. Olshan USNRC Senior Licensing Project Manager -

Salem Mr. D. Moran USNRC Licensing Project Manager -

Hope Creek Mr. c. Marschall USNRC Senior Resident Inspector Mr. R. Summers USNRC Senior Resident Inspector Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering JUL 2 71995 (S09)

(S09)

New Jersey Department of Environmental Protection

i.

95-4933

STATE OF NEW JERSEY COUNTY OF SALEM

)

)

SS.

)

REF: NLR-N95108 E. c. Simpson, being duly sworn according to law deposes and says:

I am Senior Vice President - Nuclear Engineering of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter, referenced above, concerning our Fitness For Duty Program for the Salem and Hope Creek Generating Stations, are true to the best of my knowledge, information and belief.

subscribed Land th~,, Ql]Th 1995

Public Service Electric & Gas Company Hancock's Bridge, NJ 08038 Location Ronald J. Mack, M.D.

Contact Name Fitness for Duty Program Performance Data Personnel Subject to 1 OCFR26 Cutoffs: Screen/Confirmation (ng/ml)

Marijuana 50/15 Amphetamines 1000/500 Cocaine*

300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (% BAC) 0.04%

Long-Term TestinQ Results Licensee Employees Contractor Personnel Average Number with Unescorted Access 2,359 622 Categories

  1. Tested
  1. Positive
  1. Tested
  1. Positive Pre-Access 234 0

31 0

For Cause:

Post Accident 0

0 0

0 Observed Behavior 3

0 0

0 Random 663 0

117 0

Follow-up 22 0

0 0

Other 0

0 0

0 Total 922 0

148 0

June 30, 1995 6 Months Ending (609)339-5600 Phone (include area code)

Appendix to 1 OCFR 26 N/A I

N/A I

N/A I

Short-Term Contractor Personnel 360

  1. Tested
  1. Positive 616 3

0 0

1 0

70 0

0 0

0 0

687 3

Breakdown of Confirmed Positive Tests for Specific Substances Amphe-Phency-Refusal.to Marijuana Cocaine Opiates tamines clidine Alcohol Test 1

2 3

4 5

Licensee Employees 0

0 0

0 0

010 0

Long-Term Contractors 0

0 0

0 0

010 0

Short-Term Contractors 2

2 0

o_

0 010 0

A Total 2

2 0

0 0

0 0

4 I

X/Y X=NRC Cutoff Y=PSE&G Cutoff NRC PSE&G Alcohol 0.04%

0.02%

i L

SUMMARY

OF MANAGEMENT ACTIONS Suspensions based on presumptive positives: 0 Reportable events: 0 Appeals/Resolutions: During the time period January 1, 1995 to June 30, 1995, eight appeals have been resolved. No appeals resulted in reversal of original action.

Four psychological appeals resulted from the determination that drug rehabilitation requirements had not. peen adequately met.

One appeal resulted from an access denial based on a security determination of lack of trustworthiness and reliability.

One appeal resulted from an access denial based on a psychological determination of lack of trustworthiness and reliability.

  • . One Fitness-For-Duty appeal involved a claim that over the counter medications contributed to positive drug test results.

One Fitness-For-Duty appeal involved an allegation that a procedural error occurred during the collection process.

Trends: 1990 to Present Opiates: No MRO positives since the Fitness-For-Duty rule went into effect.

PCP: No positives for the third consecutive year.

Rare challenges to the accuracy and validity offfiIS laboratory test results.

This is the first non-outage FFD 6 month report. Decreased numbers of short term contractors has resulted in the lowest positive rate in the pre-access category since the FFD rule went into effect.

Recommendations:

Eliminate the second breath alcohol test when the first test is negative.

After greater than 76,000 breath tests, equipment sensitivity of 100% has been demonstrated (second breath test has never been positive after the first breath test was negative). Cost savings over months to years would be considerable.

Continue to permit/encourage on-site pre-screening.

Consider moving toward "interchangeability" and mutual acceptance among regulated Fitness-F or-Duty programs (NRC, DOT, RSPA).

7/05/95 CTGRY PRE-EMP!-OYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP

  • OTHER TOTAL PUBLIC

~tHV!LC CLCLIKlL ~UM~ LUm~KNY NUCLEAR DE~ARTMENT I MEDICAL FITNESS-FDR-DUTY STATISTICS REPORT FOR PERIOD:

01/01/95 THRU 06/30/95


PERMANENT EMPLOYEES------


SHORT-TERM CONTRACTORS----

SCH ED TEST POS % TEST

% POS SCH ED TEST POS % TEST

% POS 81 81 0 100.00 o.oo 0

0 0

0.00 0.00 153 153 0 100. 00 0.00 616 616 3 100.00 0.48 0

0 0

0.00 0.00 0

0 0

0.00 0.00 3

3 0 100. DO 0.00 0 100.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 663 663 0 100.00 0.00 70 70 0 100.00 0.00 22 22 0 100.00 0.00 0

0 0

0.00 0.00 0

0 0

D.OD 0.00 0

0 0

0.00 0.00 922 922 0 100.00 0.00 687 687 3 100.00 0.43

.f


LONG-TERM CONTRACTORS-----

SCH ED TEST POS % TEST

% POS 0

0 0

0.00 0.00 31 31 0 100.00 0.00

1. **

0 0

0 0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 117 117 0 100.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 148 148 0 100.00 0.00

PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST

SUMMARY

BY SUBSTANCE FOR PERIOD:

01/01/95 THRU 06/30/95 SUBSTANCE OCCURANCES MARIJUANA 2

COCAINE 2

      • TOTAL ***

4 *

  • One person tested positive for two substances PAGE