ML18127B599: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:8770- G - 1 65 SH. 4A                                                                                                                                                                                                                           NO     DATE REVISIONS BY   CH!     APPROVED
{{#Wiki_filter:8770- G-1 65 SH.
: /Ml        DESCRIPTION PCM DOO61       INITIAL ISSUE RA1 z                                                                                                                 RA1z I
4A REVISIONS NO DATE DESCRIPTION
B COUNT ROOM A2                                                                                                                     RA2 C-                   RISE TO EL 37'-9 CONTINUATION AT RIGHT (C-7)                                                                                                 DOWN TO EL AT 27'-3'ONTINUATION c9                ~        9                                                                            LEFT (C-3)
: /Ml BY CH!
A                                                                                                                                                                                                        C.'AD.
APPROVED PCM DOO61 INITIAL ISSUE RA1 z RA1z I
C CHEM. IAB E
B COUNT ROOM A2 C-RISE TO EL 37'-9 CONTINUATION AT RIGHT (C-7) c9
SAMPLE C
~
C-                     E 9
9 RA2 DOWN TO EL 27'-3'ONTINUATION AT LEFT (C-3)
INSTR. CALI6. &
C.'AD.
CHEM. IAB A
C C
C-E 9 SAMPLE E
INSTR.
CALI6.
REPAIR SHOP A
REPAIR SHOP A
C" ELECTR!CAL HOT SHOP                               GAS ANALYZ QRA3                                                                                                                  RA3 CDNTINUED AT LEFT (E-2)
C" QRA3 ELECTR!CAL HOT SHOP GAS ANALYZ RA3 CDNTINUED AT LEFT (E-2)
THERMOLAG ENCLOSURE THERMOLAG ENCLOSURE                                                                                                      THER OLAG ENCLOSURE (THERMOLAG ENCLOSURE)
THERMOLAG ENCLOSURE THERMOLAG ENCLOSURE (THERMOLAG ENCLOSURE)
I DROP TO EL 23'-6 INSPECTORS TFST CONN.
THER OLAG ENCLOSURE I
CORRIDOR STAIRS
)
                                                            )      PENETRATE WALL AT EL    27'-0 X
STAIRS CORRIDOR PENETRATE WALL AT EL 27'-0 X
C LAUNDRY RA4                                                                                                                   RA4 NOTES:
DROP TO EL 23'-6 INSPECTORS TFST CONN.
DECONTAM.                                                                                                                                                                                                      1. FOR LEGEND AND NOTES SEE       6770-6-165   SH. 2
C LAUNDRY RA4 RA4 DECONTAM.
: 2. FOR FIRE DOORS AND CAMPERS SEE       6770-G 165 SHEciS 4 & 6 AJ                                       RAI                                         RAH                               QRA J                              RAI                               RAH FLORIDA POWER ZK LIGHT COMPANY PLAN EL.       19.50'ELOW         HOUDAILLE SLAB                                                                         PLAN EL.       28.67'BOVE   HOUDAILLE SLAB I                                                                   ST. LUCIE PLANT UNIT NO, I FIRE PROTECTION REACTOR AUX. BUILDING FIRE SPRINKLERS MECHANICAL SCALE:   I/4 =I'-0       APPROVAL       DATE:
NOTES:
DN    MECH                              6770-G-165 PR. CUNNINGHAM SHEET BERCERON 4A}}
1.
FOR LEGEND AND NOTES SEE 6770-6-165 SH.
2 2.
FOR FIRE DOORS AND CAMPERS SEE 6770-G 165 SHEciS 4 & 6 AJ RAI RAH QRAJ RAI RAH PLAN EL. 19.50'ELOW HOUDAILLE SLAB PLAN EL. 28.67'BOVE HOUDAILLE SLAB I FLORIDA POWER ZK LIGHT COMPANY ST.
LUCIE PLANT UNIT NO, I
FIRE PROTECTION REACTOR AUX. BUILDING FIRE SPRINKLERS SCALE: I/4 =I'-0 DN MECH PR.
CUNNINGHAM BERCERON MECHANICAL APPROVAL DATE:
6770-G-165 SHEET 4A}}

Latest revision as of 22:38, 5 January 2025

Drawing 8770-G-165, Rev. 0, Fire Protection Reactor Aux. Building Fire Sprinklers. Sheet 4A
ML18127B599
Person / Time
Site: Saint Lucie 
Issue date: 03/01/2001
From:
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
8770-G-165, Rev 0
Download: ML18127B599 (1)


Text

8770- G-1 65 SH.

4A REVISIONS NO DATE DESCRIPTION

/Ml BY CH!

APPROVED PCM DOO61 INITIAL ISSUE RA1 z RA1z I

B COUNT ROOM A2 C-RISE TO EL 37'-9 CONTINUATION AT RIGHT (C-7) c9

~

9 RA2 DOWN TO EL 27'-3'ONTINUATION AT LEFT (C-3)

C.'AD.

CHEM. IAB A

C C

C-E 9 SAMPLE E

INSTR.

CALI6.

REPAIR SHOP A

C" QRA3 ELECTR!CAL HOT SHOP GAS ANALYZ RA3 CDNTINUED AT LEFT (E-2)

THERMOLAG ENCLOSURE THERMOLAG ENCLOSURE (THERMOLAG ENCLOSURE)

THER OLAG ENCLOSURE I

)

STAIRS CORRIDOR PENETRATE WALL AT EL 27'-0 X

DROP TO EL 23'-6 INSPECTORS TFST CONN.

C LAUNDRY RA4 RA4 DECONTAM.

NOTES:

1.

FOR LEGEND AND NOTES SEE 6770-6-165 SH.

2 2.

FOR FIRE DOORS AND CAMPERS SEE 6770-G 165 SHEciS 4 & 6 AJ RAI RAH QRAJ RAI RAH PLAN EL. 19.50'ELOW HOUDAILLE SLAB PLAN EL. 28.67'BOVE HOUDAILLE SLAB I FLORIDA POWER ZK LIGHT COMPANY ST.

LUCIE PLANT UNIT NO, I

FIRE PROTECTION REACTOR AUX. BUILDING FIRE SPRINKLERS SCALE: I/4 =I'-0 DN MECH PR.

CUNNINGHAM BERCERON MECHANICAL APPROVAL DATE:

6770-G-165 SHEET 4A