ML18127B599: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:8770-G-1 65 SH.4A REVISIONS NO DATE DESCRIPTION | {{#Wiki_filter:8770- G-1 65 SH. | ||
:/Ml BY CH!APPROVED PCM DOO61 INITIAL ISSUE RA1 z RA1z I B COUNT ROOM A2 | 4A REVISIONS NO DATE DESCRIPTION | ||
THER OLAG ENCLOSURE I)STAIRS CORRIDOR PENETRATE WALL AT EL 27'-0 X DROP TO EL 23'-6 INSPECTORS TFST CONN.C LAUNDRY RA4 RA4 DECONTAM.NOTES: 1.FOR LEGEND AND NOTES SEE 6770-6-165 SH.2 2.FOR FIRE DOORS AND CAMPERS SEE 6770-G | : /Ml BY CH! | ||
APPROVED PCM DOO61 INITIAL ISSUE RA1 z RA1z I | |||
B COUNT ROOM A2 C-RISE TO EL 37'-9 CONTINUATION AT RIGHT (C-7) c9 | |||
~ | |||
9 RA2 DOWN TO EL 27'-3'ONTINUATION AT LEFT (C-3) | |||
C.'AD. | |||
CHEM. IAB A | |||
C C | |||
C-E 9 SAMPLE E | |||
INSTR. | |||
CALI6. | |||
REPAIR SHOP A | |||
C" QRA3 ELECTR!CAL HOT SHOP GAS ANALYZ RA3 CDNTINUED AT LEFT (E-2) | |||
THERMOLAG ENCLOSURE THERMOLAG ENCLOSURE (THERMOLAG ENCLOSURE) | |||
THER OLAG ENCLOSURE I | |||
) | |||
STAIRS CORRIDOR PENETRATE WALL AT EL 27'-0 X | |||
DROP TO EL 23'-6 INSPECTORS TFST CONN. | |||
C LAUNDRY RA4 RA4 DECONTAM. | |||
NOTES: | |||
1. | |||
FOR LEGEND AND NOTES SEE 6770-6-165 SH. | |||
2 2. | |||
FOR FIRE DOORS AND CAMPERS SEE 6770-G 165 SHEciS 4 & 6 AJ RAI RAH QRAJ RAI RAH PLAN EL. 19.50'ELOW HOUDAILLE SLAB PLAN EL. 28.67'BOVE HOUDAILLE SLAB I FLORIDA POWER ZK LIGHT COMPANY ST. | |||
LUCIE PLANT UNIT NO, I | |||
FIRE PROTECTION REACTOR AUX. BUILDING FIRE SPRINKLERS SCALE: I/4 =I'-0 DN MECH PR. | |||
CUNNINGHAM BERCERON MECHANICAL APPROVAL DATE: | |||
6770-G-165 SHEET 4A}} | |||
Latest revision as of 22:38, 5 January 2025
| ML18127B599 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/01/2001 |
| From: | Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 8770-G-165, Rev 0 | |
| Download: ML18127B599 (1) | |
Text
8770- G-1 65 SH.
4A REVISIONS NO DATE DESCRIPTION
- /Ml BY CH!
APPROVED PCM DOO61 INITIAL ISSUE RA1 z RA1z I
B COUNT ROOM A2 C-RISE TO EL 37'-9 CONTINUATION AT RIGHT (C-7) c9
~
9 RA2 DOWN TO EL 27'-3'ONTINUATION AT LEFT (C-3)
C.'AD.
CHEM. IAB A
C C
C-E 9 SAMPLE E
INSTR.
CALI6.
REPAIR SHOP A
C" QRA3 ELECTR!CAL HOT SHOP GAS ANALYZ RA3 CDNTINUED AT LEFT (E-2)
THERMOLAG ENCLOSURE THERMOLAG ENCLOSURE (THERMOLAG ENCLOSURE)
THER OLAG ENCLOSURE I
)
STAIRS CORRIDOR PENETRATE WALL AT EL 27'-0 X
DROP TO EL 23'-6 INSPECTORS TFST CONN.
C LAUNDRY RA4 RA4 DECONTAM.
NOTES:
1.
FOR LEGEND AND NOTES SEE 6770-6-165 SH.
2 2.
FOR FIRE DOORS AND CAMPERS SEE 6770-G 165 SHEciS 4 & 6 AJ RAI RAH QRAJ RAI RAH PLAN EL. 19.50'ELOW HOUDAILLE SLAB PLAN EL. 28.67'BOVE HOUDAILLE SLAB I FLORIDA POWER ZK LIGHT COMPANY ST.
LUCIE PLANT UNIT NO, I
FIRE PROTECTION REACTOR AUX. BUILDING FIRE SPRINKLERS SCALE: I/4 =I'-0 DN MECH PR.
CUNNINGHAM BERCERON MECHANICAL APPROVAL DATE:
6770-G-165 SHEET 4A