ML18136A067: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/16/1979
| issue date = 10/16/1979
| title = Forwards Monthly Operating Rept for Sept 1979
| title = Forwards Monthly Operating Rept for Sept 1979
| author name = STALLINGS C M
| author name = Stallings C
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| addressee name = HARTFIELD R A
| addressee name = Hartfield R
| addressee affiliation = NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
| addressee affiliation = NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
| docket = 05000280, 05000281
| docket = 05000280, 05000281
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:*ELECTRIC AND POWER COMPANY RrcHMoND, V:cuor.N .tA 23261 October 16, 1979 Mr. R. A. Hartfield, Acting Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555  
{{#Wiki_filter:VIRGI~ *ELECTRIC AND POWER COMPANY RrcHMoND, V:cuor.N.tA 23261 October 16, 1979 Mr. R. A. Hartfield, Acting Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555  


==Dear Mr. Hartfield:==
==Dear Mr. Hartfield:==
 
Serial No. 838 PO/RMT:baw Docket No. 50-280 50-281 License No. DPR-32 DPR-37 Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos.
Serial No. 838 PO/RMT:baw Docket No. 50-280 50-281 License No. DPR-32 DPR-37 Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. 1 and 2 for the month of September, 1979. Very truly yours, [v cUl,.1 L C. M.
1 and 2 for the month of September, 1979.
Vice President-Power Supply and Production Operations Enclosure (3 copies) cc: Mr. Victor Stello, Director (10 copies) Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy) Office of Inspection and Enforcement  
Very truly yours,
-Region II}}
[v ~C cUl,.1 L C. M. Stal11~~
Vice President-Power Supply and Production Operations Enclosure (3 copies) cc:
Mr. Victor Stello, Director (10 copies)
Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy)
Office of Inspection and Enforcement - Region II}}

Latest revision as of 21:47, 5 January 2025

Forwards Monthly Operating Rept for Sept 1979
ML18136A067
Person / Time
Site: Surry  
Issue date: 10/16/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Hartfield R
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML18136A068 List:
References
NUDOCS 7910190386
Download: ML18136A067 (1)


Text

VIRGI~ *ELECTRIC AND POWER COMPANY RrcHMoND, V:cuor.N.tA 23261 October 16, 1979 Mr. R. A. Hartfield, Acting Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Hartfield:

Serial No. 838 PO/RMT:baw Docket No. 50-280 50-281 License No. DPR-32 DPR-37 Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos.

1 and 2 for the month of September, 1979.

Very truly yours,

[v ~C cUl,.1 L C. M. Stal11~~

Vice President-Power Supply and Production Operations Enclosure (3 copies) cc:

Mr. Victor Stello, Director (10 copies)

Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy)

Office of Inspection and Enforcement - Region II