ML18136A365: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/07/1980
| issue date = 01/07/1980
| title = Forwards Steam Generator Repair Program,Progress Rept 5 for Oct-Nov 1979
| title = Forwards Steam Generator Repair Program,Progress Rept 5 for Oct-Nov 1979
| author name = STALLINGS C M
| author name = Stallings C
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| addressee name = DENTON H R, SCHWENCER A
| addressee name = Denton H, Schwencer A
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000280, 05000281
| docket = 05000280, 05000281
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:..
{{#Wiki_filter:..
* e VIRGINIA ELECTRIC AND POWER COMPANY RICl:DIOND,VI:&GIN.IA 23261 January 7, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn: Mr. A. Schwencer, Chief Operating Reactors Branch No. 1 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D. C. 20555  
e VIRGINIA ELECTRIC AND POWER COMPANY RICl:DIOND,VI:&GIN.IA 23261 January 7, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:
Mr. A. Schwencer, Chief Operating Reactors Branch No. 1 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D. C. 20555  


==Dear Mr. Denton:==
==Dear Mr. Denton:==
Serial Number 005 PO/SPS: sjl Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR...;.37 Enclosed herein, pursuant to the license conditions issued under Amendment No. 46 to the operating license for Surry Power Station, is Progress Report No. 5 describing the occupational exposure expended, the dose reduction niques employed and their effectiveness, and the radioactive effluents and solid waste generated by the steam generator replacement activities-.
Serial Number 005 PO/SPS: sjl Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR...;.37 Enclosed herein, pursuant to the license conditions issued under Amendment No. 46 to the operating license for Surry Power Station, is Progress Report No. 5 describing the occupational exposure expended, the dose reduction tech-niques employed and their effectiveness, and the radioactive effluents and solid waste generated by the steam generator replacement activities-. This report covers the period October 1, 1979 through November 30, 1979.
This report covers the period October 1, 1979 through November 30, 1979. If you have any questions on this matter, do not hesitate to contact us. Enclosure cc: Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region II Very truly yours, C. M. Stallings Vice President-Power Supply and Production Operations  
If you have any questions on this matter, do not hesitate to contact us.
""' s 0011 C D4-'/0 ..}}
Enclosure cc:
Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region II Very truly yours, C. M. Stallings Vice President-Power Supply and Production Operations s 0011 C D4-'/0..}}

Latest revision as of 21:43, 5 January 2025

Forwards Steam Generator Repair Program,Progress Rept 5 for Oct-Nov 1979
ML18136A365
Person / Time
Site: Surry  Dominion icon.png
Issue date: 01/07/1980
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML18136A366 List:
References
005, 5, NUDOCS 8001100490
Download: ML18136A365 (1)


Text

..

e VIRGINIA ELECTRIC AND POWER COMPANY RICl:DIOND,VI:&GIN.IA 23261 January 7, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. A. Schwencer, Chief Operating Reactors Branch No. 1 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Denton:

Serial Number 005 PO/SPS: sjl Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR...;.37 Enclosed herein, pursuant to the license conditions issued under Amendment No. 46 to the operating license for Surry Power Station, is Progress Report No. 5 describing the occupational exposure expended, the dose reduction tech-niques employed and their effectiveness, and the radioactive effluents and solid waste generated by the steam generator replacement activities-. This report covers the period October 1, 1979 through November 30, 1979.

If you have any questions on this matter, do not hesitate to contact us.

Enclosure cc:

Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region II Very truly yours, C. M. Stallings Vice President-Power Supply and Production Operations s 0011 C D4-'/0..