ML18142B871: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[05000244/LER-2075-011]]
| number = ML18142B871
| issue date = 06/30/1975
| title = LER 1975-011-00 for R. E. Ginna, Failure to Increase Reactor Coolant Sample Test for Gross Radioactivity Concentration to a Minimum of Once Per Day When Gross Radioactivity Concentration Exceeds 10% of T.S Limit
| author name = White L
| author affiliation = Rochester Gas & Electric Corp
| addressee name = O'Reilly J
| addressee affiliation = NRC/IE, NRC/RGN-I
| docket = 05000244
| license number = DPR-018
| contact person =
| document report number = LER 1975-011-00
| document type = Letter, Licensee Event Report (LER)
| page count = 5
}}
 
=Text=
{{#Wiki_filter:NRC      TRIBUTION FOR PART 50 DOCKF                'TERIAL (TEMPORARY FORM)
CONTROL NO:          74>>
FILE INCIDENI'EPORT FILE FROM. Rochester Gas      S  Elec. Co  PBATE OF DOC        DATE R EC'D        LTR    TWX    RPT  . OTHER Rochester, N.Y. 14649 L,D White Jr.                                  6-30 "75        7-11-75 TO                                                ORIG        CC      OTHER Mr. J. P. O'Reill                                1 si  ned                            SENT LOCAL PDR CLASS      UNC LASS      PROP INFO    .        INPUT      NO CYS REC'D            DOCKET NO:
                                        \
1                      50>>244 DESCRIPTION:Ltr trans the following:                        ENCLOSURES: Licensee Event. Report (AO-75-11) on 6-17-75 re failure to increa'se.reactor coolant sample test. for gross radioactivity concentration .ta a. minimum of once pe'r day when gross radioactivity concentration t
                                                                    ~
exceeds 10% of,the Tech, Spec 'limits....
                                                                    ,(1 cy encl      rec'd)
PLANT NAME:      R.E ~ Ginna    Plant
                                                                                                    )I('l(ibtollil[E@Eg FOR ACTION/INFORM            . g  iD '.      '-75 BUTLER (L)              SCHWENCER (L)          ZIEMANN (L)          'REGAN (E)
W/ Copies                W/ Copies              W/ Copies              W/ Copies CLARK (L)                STOLZ (L)              DICKER (E)            LEAR (L)
W/ Copies                W/ Copies              W/ Copies            Ml/ Copies PARR (L)                VASSALLO (L)            KNIGHTON (E)          SPELS W/ Copies KNI EL (L)
Ml/ Copies W/ Copies PURPLE (L)
Wopies
                                              ~
                                                  '/W/ Copies YOUNGBLOOD (E)
Copies INTERNAL DISTRIBUTION W/ Copies Ml/ Copies TECH REVIEW            DENTON                LIC ASST                A/T IND .
~R        DR            ~SCHROEDE      R      ~~G R IMES          R. DIGGS (L)                  BRAITiMAN OGC, ROOMi P-BOGA      ~ACCARY                  GAMMILL          H. GEARIN (L)                SALTZMAN GOSSICK/STAFF            KNIGHT                KASTNER          E. GOULBOURNE (L)            MELTZ .
~CASE                      PAWLICKI              BALLARD          P. KREUTZER (E)
GIAMBUSSO                SHAO                  SPANGLER          J. LEE (L)                    PLANS BOYD              "-1'~ STE LLO M- RUSHIIROOK (L)              MCDONALD MOOR E. (L)        >"-~ HOUSTON                ENVI RO          S. REED (E)                    CHAP MiAN DEYOUNG (L)        """'~NOVAK                  MULLER              . SERVICE (L')              DUBF (Ltr)
SKOVHOLT (L)          ~ROSS                    DICKER              . SHEPPARD (L)              E. COUPE GOLLER (L) (Ltr)      ~  IPPOLITO              KNIGHTON        M. SLATER (E)                  PLTE RSON P. COLLINS              /TEDESCO                YOUNGBLOOD      H. SMITH (L)                  I.IARTFIE LD (2)
DENISF RLG OPR J, COLLINS              REGAN            S. TEETS    (L)            ~ KLECKER LAINAS                PROJECT LDR      G. WILLIAMS(E)                EISENHUT
~FI I E K REGION (2)        BENAROYA                                V. WILSON (L)                'WIGG INTON
                    ~
~.IfIPC/PE (S)
STEELE VOLLMER                HAR LESS        R. INGRAM (L)                ~  F. WILLIAMS M    DUNCAN EXTERNAL DISTR IBUTION 1    LOCAL POR              Lyons,,N.Y.--        Rochester, N,Y.
~1 TIC (ABERNATHY) (1)(2)(10) NATIONAL LABS                                        1 P D R-SAN/LA/NY
~l1    NSIC (BUCHANAN)
ASLB 1  W. PENNINGTON, Rm E-201 GT                1 BROOKHAVEN NAT LAB G. ULR IKSON, ORNL 1  CONSULTANTS                                1 1 Newton Anderson                        NEWMARK/BLUPI E/AG BABIAN                1 AGMED (RUTH GUSSMAN)
~a- ACRS SEI'T TO LIC,",SST Sheppard                7-12-75                              Rm 8.127 GT SEND OWLY TEN DAY REPORTS                                                      1 J. D. RUNKLES, Rm E-201 GT
 
/" k
  ~ t I
      ~ ~
          ~
            'g
            ~ 1 H
                      ~ I
                                    ~ ~
                                        ~ 4 ~
                  ~ ~    ~ ~ ~
r
                                ..8
 
                                                                                    '                                Ntk
  /ElS/////
              //
                  /I/I/I///
regulatory Do'oker File                        k'I k
YOAE
  ////// ///(///////mz
>                                                                                                                "IIAEC
                                                                                                                  ~
ROCHESTER GAS AND.                                  -ORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D, WHITE, JR                                                                              %El.EPHONE VICE PRESIDENT o.ops                                        AREA CODE 7IS    546.2700
                                        'I/g~g@.                  June 30, 1975 Ef(fg                                                  '3
                                        ~
                                  @i~        42~
                                                                                                  ~+Kg r
pe'r.
James P. One                          'ctor                                    lug~  Q U. S. Nuclear Regulatory Commission Office of Inspection'nd Enforcement Region I                                                                                k 631 Park Avenue King of Prussia, Pennsylvania                          19406
 
==Subject:==
Abnormal Occurrence 75-11, Failure to increase reactor coolant sample test for gross radioactivity concentration to a minimum of once per day when gross radioactivity concentration exceeds 10% of the limit specified in Technical Specification 3.1.4. la.
R. E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244
 
==Dear Mr. O'Reilly:==
 
In accordance with Technical Specifications, Article 6. 6. 2a, the attached report of Abnormal Occurrence 75-11 is hereby submitted. Two additional copies of this letter and the attachment are enclosed.
Very truly yours, L. D. Whi, Jr.
Attachment cc: Mr. Donald F. Knuth (40)
 
      ~
I t
I ~i i
                                                                                                                                ~~t'-      ~
LIT 2 "IcM~
LICENSEE EVENT                      REPORT CONTROL BLOCK:
8!eanlatorwt          not;kit File 09LEASE ItRIMT ALL REQUIRED 1MFORMATIOM)
LICENSEE                                                                                      UCENSE                  EVENT NAME                                      LICENSE NUMBER                                      TYPE                    TYPE Qg89 NYRE 7
G    1 14 0 0        0    0    0    0    0  0        0          4    1    1    1    1      ~01 15                                                  25      26                      30      31    32 REPORT      REPORT CATEGORY          TYPE    SOURCE                DOCKET NUMBER                              EVENT DATE                        REPORT DATE
[0D1] coNT    ~MI                T          L      0    5    0        0      2  4    4        0    6    1  7    7    5          0'6      3    0    7  5 7    8        57      58        59        60    61                                      68    69                            74    75                        80 I
EVENT DESCRIPTION                                                                                                4 Jog      Durin normal ower escalation after shutdown                                        RCS      ross activit increased to 10.                        6%  of 7      8 9                                                                                                                                                        80 the limit. Fre uenc                      of ross activit anal sis was not immediatel increased to dail I
7 89                                                                                                                                                              80 t00j4    until a steady activity level was established.,Daily degassed analysis showed steady 7      8 9                                                                                                                                                        80 state except during a subsequent outage.                                    During the following escalation gross analysi 7    8 9 Qpg      showed decrease                  until a later stage of escalation when daily gross analysis was started80 7      8 9                                                                  PRME                    Abnormal Occurrence 50-244/75-11/0 SYSTEM      CAUSE                                            COMPONENT              COMPONENT CODE        CODE              COMPONENT CODE                SUPPUER              MANUFACTURER            VKtlATION
                    ~Pi    Pi      ~A            9    Pi  Pi Pi    9  Pi            Pi              E  9    9    9              Y 7      8 9 10              11        12                          17        43            44                  47          48 CAUSE DESCRIPTION toas]     Not increasing the gross activity analysis frequency was due to observation that stead 7      89-                                                                                                                                                        80 Jog state had been reached based on degassed activity analysis. Sampling requirements wer 7 8 9                                                                                                                                                            80 Qio] reviewed with'the technicians and added to the sampling schedule and analysis log shee s,.
7 89                                                                                                                                                              80 FACIUTY                                                                METHOD OF STATUS            tt  POWER                OTHER STATUS              DISCOVERY                          DISCOVERY DESCRIPTION Qg 8      9 E            ~os          o                  NA                        H          Su    t. review of          sam le      results 7                            10              12 13                              44      45      46                                                              80 FORM OF ACTIVITY      COATENT RELEASEO      OF RELEASE              AMOUNT OF ACTIVITY                                                  LOCATION OF RELEASE 8              H                        NA                                                    NA 7      8      9                10      11                                        44      45                                                                    80 PERSONNEL EXPOSURES NUMBER          TYPE        DESCRIPTION
          ~t3      ~OO        O        E                        NA 7      8 9              11    12      13                                                                                                                        80 PERSONNEL INJUFIIES NUMBER          DESCRIPTION
          ~4        ~oo        o                                  NA 7      8 9              11  12                                                                                                                                  80 OFFSITE CONSEQUENCES NA 7      8 9                                                                                                                                                        80 LOSS OR DAMAGE TO FACILITY TYPE      DESCRIPTION
        ~16                                                      NA 7      89          10                                                                                                                                            80 NA 7      89                                                                                                                                                        80 ADDITIONAL FACTORS Reactor coolant                ross activity has averaged 15-20% of the limit for the past three years 7      89                                                                                                                                                        80
        ~19        due to tramp uranium and is proportional to power                                      level.
7      89                                                                                                                                                        80 NAME:              Bernard R. Quinn                                                    PHDNE,7 1 6-546-2700,                ext. 29 1-22    1 GPO  88t 667
 
e ~
a~ ~
    . ~ qr II
~}}

Latest revision as of 20:42, 5 January 2025