ML18149A362: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
| project =  
| project = TAC:60713
| stage = Withdrawal
| stage = Withdrawal
}}
}}
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:' '
{{#Wiki_filter:' '
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 II.
II.
W. L. STEWART VICE PRESIDENT NUCLEAR OPERATIONS October 7, 1986 Mr. Harold R. Denton, Director                       Serial No. 86-027B Office of Nuclear Reactor Regulation                 NO/ETS/vlh Attn: Mr. Lester S. Rubenstein, Director             Docket No. 50-281 PWR Project Directorate No. 2               License No. DPR-37 Division of PWR Licensing-A U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEWART VICE PRESIDENT NUCLEAR OPERATIONS October 7, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NO*. 2 WITHDRAWAL OF 10CFR50 APPENDIX J EXEMPTION REQUEST In a letter dated February 7, 1986 (Serial No. 86-027), we requested a specific exemption for Unit 2 from 10CFR50, Appendix J, Section III.A.6(b), which requires a Type A test every refueling shutdown, until two consecutive Type A tests meet the acceptance criteria of Section III.D of 10CFR50, Appendix J.       Based on recent problems associated with operation of the Containment Sump Isolation Valves in Unit No. 1, we have re-evaluated our position and are withdrawing our 10CFR50, Appendix J Type A test exemption request for Unit No. 2.
Mr. Lester S. Rubenstein, Director PWR Project Directorate No. 2 Division of PWR Licensing-A U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NO*. 2 WITHDRAWAL OF 10CFR50 APPENDIX J EXEMPTION REQUEST Serial No.
NO/ETS/vlh Docket No.
License No.
86-027B 50-281 DPR-37 In a {{letter dated|date=February 7, 1986|text=letter dated February 7, 1986}} (Serial No. 86-027), we requested a specific exemption for Unit 2
from
: 10CFR50, Appendix J, Section III.A.6(b), which requires a Type A test every refueling shutdown, until two consecutive Type A tests meet the acceptance criteria of Section III.D of 10CFR50, Appendix J.
Based on recent problems associated with operation of the Containment Sump Isolation Valves in Unit No. 1, we have re-evaluated our position and are withdrawing our 10CFR50, Appendix J Type A test exemption request for Unit No. 2.
If you have additional questions, please contact us.
If you have additional questions, please contact us.
Very truly yours,
Very truly yours,  
            ~.~
~.~
W. L. Stewart 8610160169 861007r]**
W. L. Stewart 8610160169 861007r]*
PDR ADOCK 05000281 P
PDR ADOCK 05000281 P
* PDR
PDR  


' \'.,
' \\'.,
e                       --
e cc:
cc: Dr. J. Nelson Grace Regional Administrator NRC Region II Mr. Albert F. Gibson, Acting Director Division of Reactor Projects NRC Region I I Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. Chandu P. Patel NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A}}
Dr. J. Nelson Grace Regional Administrator NRC Region II Mr. Albert F. Gibson, Acting Director Division of Reactor Projects NRC Region I I Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. Chandu P. Patel NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A  
--}}

Latest revision as of 20:25, 5 January 2025

Requests Withdrawal of 860207 Request for Exemption from 10CFR50,App J,Section III.A.6(b) Requirements for Type a Test Every Refueling Shutdown,Based on Problems W/Operation of Containment Sump Isolation Valves
ML18149A362
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/07/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Rubenstein L
Office of Nuclear Reactor Regulation
References
86-027B, 86-27B, TAC-60713, NUDOCS 8610160169
Download: ML18149A362 (2)


Text

' '

II.

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEWART VICE PRESIDENT NUCLEAR OPERATIONS October 7, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Lester S. Rubenstein, Director PWR Project Directorate No. 2 Division of PWR Licensing-A U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NO*. 2 WITHDRAWAL OF 10CFR50 APPENDIX J EXEMPTION REQUEST Serial No.

NO/ETS/vlh Docket No.

License No.

86-027B 50-281 DPR-37 In a letter dated February 7, 1986 (Serial No.86-027), we requested a specific exemption for Unit 2

from

10CFR50, Appendix J, Section III.A.6(b), which requires a Type A test every refueling shutdown, until two consecutive Type A tests meet the acceptance criteria of Section III.D of 10CFR50, Appendix J.

Based on recent problems associated with operation of the Containment Sump Isolation Valves in Unit No. 1, we have re-evaluated our position and are withdrawing our 10CFR50, Appendix J Type A test exemption request for Unit No. 2.

If you have additional questions, please contact us.

Very truly yours,

~.~

W. L. Stewart 8610160169 861007r]*

PDR ADOCK 05000281 P

PDR

' \\'.,

e cc:

Dr. J. Nelson Grace Regional Administrator NRC Region II Mr. Albert F. Gibson, Acting Director Division of Reactor Projects NRC Region I I Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. Chandu P. Patel NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A

--