ML18152A575: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18152A575
| number = ML18152A575
| issue date = 12/10/1984
| issue date = 12/10/1984
| title = Comments on QA Guidance Criteria Re ATWS of nonsafety- Related Equipment,Per 841031 Ltr.Using App B as Framework for Presenting Applicable QA Guidance Criteria Acceptable
| title = Comments on QA Guidance Criteria Re ATWS of nonsafety- Related Equipment,Per .Using App B as Framework for Presenting Applicable QA Guidance Criteria Acceptable
| author name = Stewart W
| author name = Stewart W
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 676, NUDOCS 8412170092
| document report number = 676, NUDOCS 8412170092
| title reference date = 10-31-1984
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:W. L. STEWART . VICE PRESIDENT NUCLEAR OPERATIONS  
{{#Wiki_filter:W. L. STEWART VICE PRESIDENT NUCLEAR OPERATIONS VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 10, 1984 Mr. Stephen M. Goldberg Serial No.:
*
Quality Assurance Branch Division of Quality Assurance Safeguards, and Inspection Programs Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
* VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 10, 1984 Mr. Stephen M. Goldberg Serial No.: Quality Assurance Branch Division of Quality Assurance Safeguards, and Inspection Programs Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
20555 Gentlemen:
E&C/WTD/vdu:
E&C/WTD/vdu:
Docket Nos. : License Nos.: VIRGINIA ELECTRIC AND POWER COMPANY ISSUANCE FOR COMMENT OF QUALITY ASSURANCE (QC) GUIDANCE RELATED TO ANTICIPATED TRANSIENTS WITHOUT SCRAM (ATWS) EQUIPMENT THAT IS NOT SAFETY-RELATED 676 2001N 50-280 50-281 50-338 50-339 DPR-32 DPR-37 NPF-4 NPF-7 This letter provides comments on the referenced subject as requested in your letter of October 31, 1984. We agree with your approach which uses Appendix Bas a framework for presenting the applicable Quality Assurance guidance criteria.
Docket Nos. :
License Nos.:
VIRGINIA ELECTRIC AND POWER COMPANY ISSUANCE FOR COMMENT OF QUALITY ASSURANCE (QC) GUIDANCE RELATED TO ANTICIPATED TRANSIENTS WITHOUT SCRAM (ATWS) EQUIPMENT THAT IS NOT SAFETY-RELATED 676 2001N 50-280 50-281 50-338 50-339 DPR-32 DPR-37 NPF-4 NPF-7 This letter provides comments on the referenced subject as requested in your letter of October 31, 1984.
We agree with your approach which uses Appendix Bas a framework for presenting the applicable Quality Assurance guidance criteria.
ln addition, we believe that all of the specified requirements can be met by combining our present procedures with some additional requirements.
ln addition, we believe that all of the specified requirements can be met by combining our present procedures with some additional requirements.
We have no recommended changes or additions to the proposed letter. We understand that the final Quality Assurance guidance is expected to be issued in February 1985. 8412170092 841210 PDR ADOCK 05000280 p PDR Very truly yours, W. L. Stewart Cf°:' ,10
We have no recommended changes or additions to the proposed letter.
* VIRGINIA ELECTRIC AND POWER COMPANY TO Mr. Steven A. Goldberg cc: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing USNRC Washington, D. C. 20555 Mr. James R. Miller, Chief Operating Reactors Branch No. 3 Division of Licensing USNRC Washington, D. C. 20555 Mr. D. J. Burke NRC Resident Inspector Surry Power Station Mr. M. W. Branch NRC Resident Inspector North Anna Power Station *-}}
We understand that the final Quality Assurance guidance is expected to be issued in February 1985.
8412170092 841210 PDR ADOCK 05000280 p
PDR Very truly yours,  
~
W. L. Stewart Cf°:'  
,10  
 
VIRGINIA ELECTRIC AND POWER COMPANY TO Mr. Steven A. Goldberg cc:
Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing USNRC Washington, D. C.
20555 Mr. James R. Miller, Chief Operating Reactors Branch No. 3 Division of Licensing USNRC Washington, D. C.
20555 Mr. D. J. Burke NRC Resident Inspector Surry Power Station Mr. M. W. Branch NRC Resident Inspector North Anna Power Station  
*-}}

Latest revision as of 19:50, 5 January 2025

Comments on QA Guidance Criteria Re ATWS of nonsafety- Related Equipment,Per .Using App B as Framework for Presenting Applicable QA Guidance Criteria Acceptable
ML18152A575
Person / Time
Site: Surry, North Anna, 05000000
Issue date: 12/10/1984
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Goldberg S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
676, NUDOCS 8412170092
Download: ML18152A575 (2)


Text

W. L. STEWART VICE PRESIDENT NUCLEAR OPERATIONS VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 10, 1984 Mr. Stephen M. Goldberg Serial No.:

Quality Assurance Branch Division of Quality Assurance Safeguards, and Inspection Programs Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

E&C/WTD/vdu:

Docket Nos. :

License Nos.:

VIRGINIA ELECTRIC AND POWER COMPANY ISSUANCE FOR COMMENT OF QUALITY ASSURANCE (QC) GUIDANCE RELATED TO ANTICIPATED TRANSIENTS WITHOUT SCRAM (ATWS) EQUIPMENT THAT IS NOT SAFETY-RELATED 676 2001N 50-280 50-281 50-338 50-339 DPR-32 DPR-37 NPF-4 NPF-7 This letter provides comments on the referenced subject as requested in your letter of October 31, 1984.

We agree with your approach which uses Appendix Bas a framework for presenting the applicable Quality Assurance guidance criteria.

ln addition, we believe that all of the specified requirements can be met by combining our present procedures with some additional requirements.

We have no recommended changes or additions to the proposed letter.

We understand that the final Quality Assurance guidance is expected to be issued in February 1985.

8412170092 841210 PDR ADOCK 05000280 p

PDR Very truly yours,

~

W. L. Stewart Cf°:'

,10

VIRGINIA ELECTRIC AND POWER COMPANY TO Mr. Steven A. Goldberg cc:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing USNRC Washington, D. C.

20555 Mr. James R. Miller, Chief Operating Reactors Branch No. 3 Division of Licensing USNRC Washington, D. C.

20555 Mr. D. J. Burke NRC Resident Inspector Surry Power Station Mr. M. W. Branch NRC Resident Inspector North Anna Power Station

  • -