| title = Responds to NRC | | title = Responds to NRC Re Deviations Noted in Insp Repts 50-280/88-32 & 50-281/88-32.Corrective Actions:Calibr Procedure CAL-466 Updated to Include Torque Requirements for Transmitter Vent & Drain Valves | ||
| author name = | | author name = Stewart W | ||
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | | author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | ||
| addressee name = | | addressee name = | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = 89-565, NUDOCS 8908310012 | | document report number = 89-565, NUDOCS 8908310012 | ||
| title reference date = 07-24-1989 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 10 | | page count = 10 | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:* VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 23, 1989 United States Nutlear*Regulatory | {{#Wiki_filter:* | ||
Commission | VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 23, 1989 United States Nutlear*Regulatory Commission Attention: | ||
Attention: | Document Control Desk Washington, D. C. | ||
Document Control Desk Washington, D. C. 20555 Gentlemen: | 20555 Gentlemen: | ||
VIRGINIA ELECTRIC AND POWER COMPANY SORRY POWER STATION UNITS 1 AND 2 RESPONSE TO NOTICE OF DEVIATION | VIRGINIA ELECTRIC AND POWER COMPANY SORRY POWER STATION UNITS 1 AND 2 RESPONSE TO NOTICE OF DEVIATION Serial No. | ||
Serial No. NL/CGL:vlh | NL/CGL:vlh Docket Nos. | ||
Docket Nos. License Nos. NRC INSPECTION | License Nos. | ||
REPORT NOS. 50-280/88-32 | NRC INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 89-565 Rev. 2 280 50-281 DPR-32 DPR-37 We have reviewed your letter of July 24, 1989 in reference to the inspection conducted at Surry Power Station on September 12-16, September 26-30 and November 14-18, 1988 and reported in Inspection Reports 50-280/88-32 and 50-281/88-32. | ||
AND 50-281/88-32 | Our response to the two deviations described in the Notice of Deviation is provided in the attachment. | ||
89-565 Rev. 2 | We have no objection to this inspection report being made a matter of public disclosure. | ||
to the inspection | If you have further questions, please contact us. | ||
conducted | Very truly yours, t | ||
at Surry Power Station on September | ( t 1--C-( : ;. __ SL | ||
12-16, September | \\,:,.) i | ||
26-30 and November 14-18, 1988 and reported in Inspection | ~ \\tj /\\'.- _J's, | ||
Reports 50-280/88-32 | : w. l.. s tewa rt Senior Vice President - Power Attachment Copy: | ||
and 50-281/88-32. | U. S. Nuclear Regulatory Commission Regional Administrator Region II 101 Marietta Street, N. W. | ||
Our response to the two deviations | Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station 9900310012 giggE~eo PDR ADOCK PNU G | ||
described | |||
in the Notice of Deviation | DEVIATION A RESPONSE TO NOTICE OF DEVIATION INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 Description of the Deviation: | ||
is provided in the attachment. | Nuclear Regulatory Commission Generic Letter 83-28 dated July 8, 1983, required actions based on generic implication of the Salem ATWS event. | ||
We have no objection | Paragraph 2.2. | ||
to this inspection | of the Enclosure requires that for vendor interface, licensees establish, implement, and maintain a continuing program to ensure that vendor information for safety-related components is complete, current and controlled throughout the life of their plants, and appropriately referenced or incorporated in plant instructions and procedures. | ||
report being made a matter of public disclosure. | Virginia Power responses to this Generit Letter (Serial No. 617, dated November 4, 1983; Serial No. 85-063, dated February 8, 1985; Serial No. | ||
85-211, dated May 20, 1985; and Serial No. | |||
-Power Attachment | 85-63B, dated August 30, 1985) detailed the program which was implemented for Surry and North Anna Nuclear Plants. | ||
Copy: U. S. Nuclear Regulatory | Virginia Power response 85-063 states that revised administrative procedures which improve the availability and adequacy of vendor reference information are in use at each station. These procedures implement the means of collecting and controlling vendor information for use by personnel involved in maintenance, replacement and repair activities. | ||
Commission | It further states that controlling Administrative Procedure 93, Vendor Interface Control Documents, at Surry, and Administrative Procedure 6.18, Control of Vendor Manuals, V~ndor Files and Interface, at North Anna, provide the primary activity for controlling vendor information for safety-related equipment. | ||
Regional Administrator | These procedures provide a method of accumulating reference information.and making the information available to the various work activities. These procedures are currently in.use. | ||
Region II 101 Marietta Street, N. W. Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector | Contrary to the above, the requirements of this program are not being followed, in that, the following examples were identified where appropriate vendor information had not been included in site procedures: | ||
Surry Power Station 9900310012 | : 1. Calibration procedure CAL | ||
giggE~eo PDR ADOCK PNU G | : 466, used to calibrate Rosemount transmitters, does not provide the vendor manual required closing torque (90 in-lbs) for the detector vent and drain valves. | ||
: 2. | |||
A RESPONSE TO NOTICE OF DEVIATION | There are no site procedures to implement vendor manual (Limitorque) required mechanical preventive maintenance for valves 01-CW-MOV-lOOA, B, | ||
INSPECTION | C, D; | ||
REPORT NOS. 50-280/88-32 | 01-CW-MOV-106A, B, | ||
AND 50-281/88-32 | C, D; | ||
Description | 02-CW-MOV-200A, B, | ||
of the Deviation: | C, D; or 02-CW-MOV-206A, B, C, D. | ||
Nuclear Regulatory | : 3. | ||
Commission | Site procedures do not include the following Emergency Service Water Diesel vendor recommendations: | ||
Generic Letter 83-28 dated July 8, 1983, required actions based on generic implication | : a. | ||
of the Salem ATWS event. Paragraph | The vendor manual requires a 20 minute wait after running the diesel for a check of the oil level. | ||
2.2. of the Enclosure | : b. | ||
requires that for vendor interface, licensees | The vendor manual requires a periodic cleaning of the diesel cooling system using a radiator cleaning compound followed by a reverse flush with fresh water. | ||
establish, implement, and maintain a continuing | |||
program to ensure that vendor information | RESPONSE TO NOTICE OF DEVIATION | ||
for safety-related | *1NSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 | ||
components | : c. | ||
is complete, current and controlled | The vendor manual requires a periodic check of ihe ~rankc~se pressure. | ||
throughout | : d. The vendor manual requires a periodic cleaning of the air box check valves followed by blow out of the lines. | ||
the life of their plants, and appropriately | : e. | ||
referenced | The vendor manual requires a periodic inspection and cleaning of the blower screen. | ||
or incorporated | : f. | ||
in plant instructions | The vendor manual requires a periodic check/change of the lubrication in the reduction gear. | ||
and procedures. | : g. | ||
Virginia Power responses | The vendor manual requires verifying oil pressure is increasing. | ||
to this Generit Letter (Serial No. 617, dated November 4, 1983; Serial No. 85-063, dated February 8, 1985; Serial No. 85-211, dated May 20, 1985; and Serial No. 85-63B, dated August 30, 1985) detailed the program which was implemented | : h. | ||
for Surry and North Anna Nuclear Plants. Virginia Power response 85-063 states that revised administrative | The vendor manual requires checking for oil leaks during pump runs. | ||
procedures | : 4. | ||
which improve the availability | The Joseph Oats Corporation's Installation, Operation and Maintenance manual for Recirculation Coolers, Revision 2A, states recommendations for a desiccant maintenance program and rust requirements. | ||
and adequacy of vendor reference | Visual observation of Recirculation Spray Heat Exchangers (RSHXs) prior to their being placed into containment identified ripped or torn covers on the RSHXs nozzles and rusting on bolts and flanges.- | ||
information | Site procedures did not address these vendor recommendations. | ||
are in use at each station. These procedures | |||
implement | DEVIATION A RESPONSE TO NOTICE OF DEVIATION | ||
the means of collecting | 'INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 (1). ADMISSION OR DENIAL OF THE ALLEGED DEVIATION: | ||
and controlling | The deviation is correct with the exceptions noted in (3) below. | ||
vendor information | (2) | ||
for use by personnel | REASON FOR THE DEVIATION: | ||
involved in maintenance, replacement | Procedure revisions to address identified vendor recommendations did not* | ||
and repair activities. | incorporate or adequately document the subject vendor requirements. | ||
It further states that controlling | (3) | ||
Administrative | CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED: | ||
Procedure | The specific concerns of the deviation are addressed as follows: | ||
93, Vendor Interface | Item 1: | ||
Control Documents, at Surry, and Administrative | Calibration procedure CAL-466 has been updated to include torque requirements for the transmitter vent and drain valves. | ||
Procedure | Temporary procedure changes will be used to include and document torque requirements in other Rosemount transmitter calibration procedures until the procedures are-revised under the procedure upgrade program. | ||
6.18, Control of Vendor Manuals, V~ndor Files and Interface, at North Anna, provide the primary activity for controlling | A memo explaining this requirement has been written and placed in the Instrument Department required reading book. | ||
vendor information | Item 2: | ||
for safety-related | A mechanical preventive maintenance procedure, which performed vendor technical manual maintenance activities, was implemented in October 1988. | ||
equipment. | Specific vendor recommended maint~nance was satisfied on the subject valves during the recent outages by performing either the necessary preventive or corrective maintenance. | ||
These procedures | An upgraded mechanical preventive maintenance procedure for the subject valves based on vendor recommendations, industry standards, and operational experience was implemented in July 1989. | ||
provide a method of accumulating | The new procedure includes activities which address specific vendor manual recommendations. | ||
reference | This procedure will be used to perform subsequent mechanical preventive maintenance work on the subject valves. | ||
information.and | Item 3a: | ||
making the information | The specific wait period for the oil level check has been incorporated into the operating procedure which starts and stops the engine, as well as the applicable periodic test procedures. | ||
available | The preventive maintenance procedure will be revised as noted in (4) below. | ||
to the various work activities. | Item 3b: | ||
These procedures | The heat exchanger for each engine was disassembled and inspected during maintenance performed after the NRC inspection. | ||
are currently | The heat exchangers | ||
in .use. Contrary to the above, the requirements | |||
of this program are not being followed, in that, the following | RESPONSE TO NOTICE OF DEVIATION INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 were found to be clean and unobstructed. | ||
examples were identified | The visible por.tions of both the raw water and the coolant water portions of the system were found to be clean. | ||
where appropriate | Chemical cleaning of the coolant system was determined to be unnecessary (based on visual inspection) and was not performed. | ||
vendor information | The disassembly and inspection of the heat exchanger was added to the present | ||
had not been included in site procedures: | * preventive maintenance procedure, which is scheduled to be performed on a 12 month frequency. | ||
1. Calibration | Chemical cleaning will be done, if necessary, as a result of visual inspection. | ||
procedure | Item 3c: | ||
The engine crankcase pressure was measured during maintenance performed after the NRC inspection and found to be within specification. | |||
Rosemount | A check of crankcase pressure was also added to the current preventive maintenance procedure for the engines, which is scheduled to be performed on a 12 month frequency. | ||
transmitters, does not provide the vendor manual required closing torque (90 in-lbs) for the detector vent and drain valves. 2. There are no site procedures | Item 3d: | ||
to implement | Emergency Service Water Pump Diesels at Surry Power Station are not equipped with air box check valves. | ||
vendor manual (Limitorque) | The vendor manual is written for engines with a variety of applications and options. | ||
required mechanical | This option would likely be used in a turbocharged diesel; the subject engines are not turbocharged. | ||
preventive | Therefore, this item is not applicable. | ||
maintenance | Item 3e: | ||
for valves 01-CW-MOV-lOOA, B, C, D; 01-CW-MOV-106A, B, C, D; 02-CW-MOV-200A, B, C, D; or 02-CW-MOV-206A, B, C, D. | The blower screen for each engine was cleaned during maintenance performed after the NRC inspection. | ||
do not include the following | No unsatisfactory conditions were noted. | ||
Emergency | Inspection of the blower screen was added to the existing preventive maintenance procedure, which is scheduled to be performed on a 12 month frequency. | ||
Service Water Diesel vendor recommendations: | Item 3f: | ||
a. The vendor manual requires a 20 minute wait after running the diesel for a check of the oil level. b. The vendor manual requires a periodic cleaning of the diesel cooling system using a radiator cleaning compound followed by a reverse flush with fresh water. | The reduction gear referred to in the Emergency Service Water Pump Diesel technical manual is not part of equipment installed at Surry. | ||
Therefore, this item is not applicable. | |||
*1NSPECTION | Item 3g: | ||
REPORT NOS. 50-280/88-32 | Specific instructions to verify increasing oil pressure immediately after starting the engine were added to applicable operating procedures and periodic tests. | ||
AND 50-281/88-32 | If the oil pressure indication is not within specification, the engine is to be shut down immediately and the cause of the indication determined before the engine is started again. | ||
c. The vendor manual requires a periodic check of ihe ~rankc~se | The preventive maintenance procedure will be revised as noted in (4) below. | ||
pressure. | |||
d. The vendor manual requires a periodic cleaning of the air box check valves followed by blow out of the lines. e. The vendor manual requires a periodic inspection | Item 3h: | ||
and cleaning of the blower screen. f. The vendor manual requires a periodic check/change | RESPONSE TO NOTICE OF DEVIATIUN INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 Checking for oil leaks whi1e the engine is running was included in the preventive maintenance procedure in place at the time of the NRC inspection. | ||
of the lubrication | The applicable operating and periodic test procedures will be revised as noted in (4) below. | ||
in the reduction | Item 4: | ||
gear. g. The vendor manual requires verifying | The site procedure SUADM-MM-05, * "Storage of Material at the Station Warehouse and Storeroom", addresses the requirements for maintenance of storage items. | ||
oil pressure is increasing. | However, this procedure was not the controlling document at*the time of the NRC inspection. A design change package controlled the requirements to be followed prior to installation. The vessels had been shipped from the vendor with anticipation for immediate field preparation for installation. | ||
h. The vendor manual requires checking for oil leaks during pump runs. 4. The Joseph Oats Corporation's | The desiccant program was not implemented because the vessels were not being stored; instead they were being prepared for installation. | ||
Installation, Operation | The nozzle covers had been installed at the factory to m1n1m1ze foreign material intrusion. | ||
and Maintenance | Prior to installation, the covers were removed and an inspection was performed to ensure cleanliness, as required by the design change contro 11 i ng procedure. | ||
manual for Recirculation | The i den ti fi ed rust was removed from bolts and flanges and the bolts were painted, per the design change controlling procedure. | ||
Coolers, Revision 2A, states recommendations | (4) | ||
for a desiccant | CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER DEVIATIONS: | ||
maintenance | The preventive maintenance procedure for the Emergency Service Water Pump Diesels will be revised to include a 20 minute wait period after starting the diesel before checking the oil level and verifying an increasing oil pressure after starting the engine. | ||
program and rust requirements. | The applicable operating and periodic test procedures will be revised to require checking the Emergency Service Water Pump Diesels for oil leaks when in operation. | ||
Visual observation | A procedure upgrade program, which will include more thorough review and documentation of vendor recommendations, has been initiated. | ||
of Recirculation | The calibration procedures for Rosemount transmitters will be revised under this program to include the torquing requirements referenced above. | ||
Spray Heat Exchangers (RSHXs) prior to their being placed into containment | In addition, the administrative procedure SUADM-ADM-05, "Procedure Review Standard", contains the following items on the procedure review checklist: | ||
identified | Verify that the referenced documents and vendor technical manuals are current and applicable. | ||
ripped or torn covers on the RSHXs nozzles and rusting on bolts and flanges.-Site procedures | Incorporate vendor recommendations, if applicable. | ||
did not address these vendor recommendations . | By this procedure, a review must be conducted no less than once every two years. | ||
Site receiving procedures will be reviewed relative to the need to incorporate interim storage requirements. | |||
A RESPONSE TO NOTICE OF DEVIATION | |||
'INSPECTION | RESPONSE TO NOTICE OF DEVIATION | ||
REPORT NOS. 50-280/88-32 | 'INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 (5) | ||
AND 50-281/88-32 | THE DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED: | ||
(1). ADMISSION | The preventive_ maintenance, periodic test, and operating procedures referenced in ( 4) above will' be revised by October 31, 1989. | ||
OR DENIAL OF THE ALLEGED DEVIATION: | The Rosemount transmitter calibration procedures will be progranmatically revised to include the applicable torquing requirements under the procedure upgrade program. | ||
The deviation | ( | ||
is correct with the exceptions | |||
noted in (3) below. (2) REASON FOR THE DEVIATION: | ==Reference:== | ||
Procedure | Letter Serial No *. 88-387 dated July 13, 1988). | ||
revisions | Site receiving procedures wi.l l be reviewed by October 31, 1989. | ||
to address identified | |||
vendor recommendations | DEVIATION B RESPONSE TO NOTICE OF DEVIATION INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 Description of-the Deviation: | ||
did not* incorporate | The Updated Final Safety Analysis Report (UFSAR) Section 7.2.1, states that the reactor protection system and engineered safeguards are designed in accordance with IEEE-279, Standard Nuclear Power Plant Protection System, dated August 1968. | ||
or adequately | Paragraph 4.13 of this Standard states that if the protective action of some parts of the system has been bypassed or deliberately rendered inoperable for any purpose, this fact shall be continuously indicated in the control rogm. | ||
document the subject vendor requirements. | Contrary to the above, portions of the service water systems can be bypassed and this condition is not continuously indicated in the control room. | ||
(3) CORRECTIVE | Specifically, the recirculation spray inlet and outlet valves SW-104A, B, C, D | ||
STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED: | and SW-105A, B, | ||
The specific concerns of the deviation | C, D have a bypass function that allows for manually closing the valves during a Consequence Limiting Safeguards HI-HI condition. | ||
are addressed | |||
as follows: Item 1: Calibration | DEVIATION B RESPONSE TO NOTICE OF DEVIATION INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 (1) | ||
procedure | ADMISSION OR DENIAL OF THE ALLEGED DEVIATION: | ||
CAL-466 has been updated to include torque requirements | The deviation is incorrect as stated. | ||
for the transmitter | The following items form the basis for the discussion of continuous indication of a bypassed action associated with protective systems: | ||
vent and drain valves. Temporary | A. | ||
procedure | The Surry Power Station UFSAR (Section 7.2.1, page 7.2-3) indicated that IEEE 279-1968 is the design basis. | ||
changes will be used to include and document torque requirements | B. | ||
in other Rosemount | The following definitions and sections are given in IEEE 279-1968: | ||
transmitter | Protective Action: | ||
calibration | An action initiated by the protective system when a limit is exceeded. | ||
procedures | A protective action can be at channel or system level. | ||
until the procedures | Protective Function: | ||
are-revised under the procedure | A system protective action which results from the protective action of the channels monitoring a particular plant condition. | ||
upgrade program. A memo explaining | Section 4.13 Indication of Bypasses: | ||
this requirement | If the protective action of some part of the system has been bypassed or deliberately rendered inoperative for any purpose, this fact shall be continuously indicated in the control room. | ||
has been written and placed in the Instrument | Section 4.16 Completion of Protective Action Once It Is Initiated: | ||
Department | The protective system shall be so designed that, once initiated, a protection system action shall go to completion. | ||
required reading book. Item 2: A mechanical | Return to operation shall require subsequent deliberate operator action. | ||
preventive | During review of the design change for the Recirculating Spray Heat Exchanger Isolation Valve Logic | ||
maintenance | : Change, the NRC inspectors identified that the design change incorporated a manual override feature which bypassed the Consequence Limiting Safeguards (CLS) | ||
procedure, which performed | HI-HI signal in the 11open 11 control circuitry for recirculation spray heat exchanger (RSHX) service water isolation valves (MOV-SW-104A, B, | ||
vendor technical | C, D; | ||
manual maintenance | MOV-SW-105A, B, | ||
activities, was implemented | C, D; | ||
in October 1988. Specific vendor recommended | MOV-SW-204A, B, C, D; and MOV-SW-205A, B, C, D). | ||
maint~nance | The manual override feature is initiated by the manual control switch for the valves and is accomplished by simply operating the manu~l control switch to the 11 CLOSE 11 position after the CLS HI-HI signal has fully opened the valve. | ||
was satisfied | Plant operators are required to isolate a RSHX by an Abnormal Procedure when the RSHX radiation monitors indicate that there is high radiation present in the service water discharging from the RSHXs. | ||
on the subject valves during the recent outages by performing | The 11 protective action 11 is the opening of the RSHX SW isolation valves which cannot be bypassed and the valves will fully open upon a CLS HI-HI signal. | ||
either the necessary | The requirement of Section 4.13 is satisfied by the fact that the opening of the valves (i.e., the protective action) cannot be bypassed. | ||
preventive | Section 4.16 allows the actuated component to "return to operation 11 by deliberate action of a control room operator and no annunciation requirement is specified for that case. | ||
or corrective | |||
maintenance. | RESPONSE TO NOTICE OF DEVIATION INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 This position is also consistent with the guidance provided in Regulatory Guide 1.47, 11 Bypassed and Inoperable Status Indication for Nuclear Power Plant Safety Systems 11.}} | ||
An upgraded mechanical | |||
preventive | |||
maintenance | |||
procedure | |||
for the subject valves based on vendor recommendations, industry standards, and operational | |||
experience | |||
was implemented | |||
in July 1989. The new procedure | |||
includes activities | |||
which address specific vendor manual recommendations. | |||
This procedure | |||
will be used to perform subsequent | |||
mechanical | |||
preventive | |||
maintenance | |||
work on the subject valves. Item 3a: The specific wait period for the oil level check has been incorporated | |||
into the operating | |||
procedure | |||
which starts and stops the engine, as well as the applicable | |||
periodic test procedures. | |||
The preventive | |||
maintenance | |||
procedure | |||
will be revised as noted in (4) below. Item 3b: The heat exchanger | |||
for each engine was disassembled | |||
and inspected | |||
during maintenance | |||
performed | |||
after the NRC inspection. | |||
The heat exchangers | |||
INSPECTION | |||
REPORT NOS. 50-280/88-32 | |||
AND 50-281/88-32 | |||
were found to be clean and unobstructed. | |||
The visible por.tions | |||
of both the raw water and the coolant water portions of the system were found to be clean. Chemical cleaning of the coolant system was determined | |||
to be unnecessary (based on visual inspection) | |||
and was not performed. | |||
The disassembly | |||
and inspection | |||
of the heat exchanger | |||
was added to the present * preventive | |||
maintenance | |||
procedure, which is scheduled | |||
to be performed | |||
on a 12 month frequency. | |||
Chemical cleaning will be done, if necessary, as a result of visual inspection. | |||
Item 3c: The engine crankcase | |||
pressure was measured during maintenance | |||
performed | |||
after the NRC inspection | |||
and found to be within specification. | |||
A check of crankcase | |||
pressure was also added to the current preventive | |||
maintenance | |||
procedure | |||
for the engines, which is scheduled | |||
to be performed | |||
on a 12 month frequency. | |||
Item 3d: Emergency | |||
Service Water Pump Diesels at Surry Power Station are not equipped with air box check valves. The vendor manual is written for engines with a variety of applications | |||
and options. This option would likely be used in a turbocharged | |||
diesel; the subject engines are not turbocharged. | |||
Therefore, this item is not applicable. | |||
Item 3e: The blower screen for each engine was cleaned during maintenance | |||
performed | |||
after the NRC inspection. | |||
No unsatisfactory | |||
conditions | |||
were noted. Inspection | |||
of the blower screen was added to the existing preventive | |||
maintenance | |||
procedure, which is scheduled | |||
to be performed | |||
on a 12 month frequency. | |||
Item 3f: The reduction | |||
gear referred to in the Emergency | |||
Service Water Pump Diesel technical | |||
manual is not part of equipment | |||
installed | |||
at Surry. Therefore, this item is not applicable. | |||
Item 3g: Specific instructions | |||
to verify increasing | |||
oil pressure immediately | |||
after starting the engine were added to applicable | |||
operating | |||
procedures | |||
and periodic tests. If the oil pressure indication | |||
is not within specification, the engine is to be shut down immediately | |||
and the cause of the indication | |||
determined | |||
before the engine is started again. The preventive | |||
maintenance | |||
procedure | |||
will be revised as noted in (4) below . | |||
INSPECTION | |||
REPORT NOS. 50-280/88-32 | |||
AND 50-281/88-32 | |||
Checking for oil leaks whi1e the engine is running was included in the preventive | |||
maintenance | |||
procedure | |||
in place at the time of the NRC inspection. | |||
The applicable | |||
operating | |||
and periodic test procedures | |||
will be revised as noted in (4) below. Item 4: The site procedure | |||
SUADM-MM-05, * "Storage of Material at the Station Warehouse | |||
and Storeroom", addresses | |||
the requirements | |||
for maintenance | |||
of storage items. However, this procedure | |||
was not the controlling | |||
document at*the time of the NRC inspection. | |||
A design change package controlled | |||
the requirements | |||
to be followed prior to installation. | |||
The vessels had been shipped from the vendor with anticipation | |||
for immediate | |||
field preparation | |||
for installation. | |||
The desiccant | |||
program was not implemented | |||
because the vessels were not being stored; instead they were being prepared for installation. | |||
The nozzle covers had been installed | |||
at the factory to m1n1m1ze foreign material intrusion. | |||
Prior to installation, the covers were removed and an inspection | |||
was performed | |||
to ensure cleanliness, as required by the design change contro 11 i ng procedure. | |||
The i den ti fi ed rust was removed from bolts and flanges and the bolts were painted, per the design change controlling | |||
procedure. | |||
(4) CORRECTIVE | |||
STEPS WHICH WILL BE TAKEN TO AVOID FURTHER DEVIATIONS: | |||
The preventive | |||
maintenance | |||
procedure | |||
for the Emergency | |||
Service Water Pump Diesels will be revised to include a 20 minute wait period after starting the diesel before checking the oil level and verifying | |||
an increasing | |||
oil pressure after starting the engine. The applicable | |||
operating | |||
and periodic test procedures | |||
will be revised to require checking the Emergency | |||
Service Water Pump Diesels for oil leaks when in operation. | |||
A procedure | |||
upgrade program, which will include more thorough review and documentation | |||
of vendor recommendations, has been initiated. | |||
The calibration | |||
procedures | |||
for Rosemount | |||
transmitters | |||
will be revised under this program to include the torquing requirements | |||
referenced | |||
above. In addition, the administrative | |||
procedure | |||
SUADM-ADM-05, "Procedure | |||
Review Standard", contains the following | |||
items on the procedure | |||
review checklist: | |||
documents | |||
and vendor technical | |||
manuals are current and applicable . | |||
vendor recommendations, if applicable. | |||
By this procedure, a review must be conducted | |||
no less than once every two years . Site receiving | |||
procedures | |||
will be reviewed relative to the need to incorporate | |||
interim storage requirements. | |||
'INSPECTION | |||
REPORT NOS. 50-280/88-32 | |||
AND 50-281/88-32 | |||
(5) THE DATE WHEN FULL COMPLIANCE | |||
WILL BE ACHIEVED: | |||
maintenance, periodic test, and operating | |||
procedures | |||
referenced | |||
in ( 4) above will' be revised by October 31, 1989. The Rosemount | |||
transmitter | |||
calibration | |||
procedures | |||
will be progranmatically | |||
revised to include the applicable | |||
torquing requirements | |||
under the procedure | |||
upgrade program. (Reference: | |||
Letter Serial No *. 88-387 dated July 13, 1988). Site receiving | |||
procedures | |||
wi.l l be reviewed by October 31, 1989 . | |||
B RESPONSE TO NOTICE OF DEVIATION | |||
INSPECTION | |||
REPORT NOS. 50-280/88-32 | |||
AND 50-281/88-32 | |||
Description | |||
of-the Deviation: | |||
The Updated Final Safety Analysis Report (UFSAR) Section 7.2.1, states that the reactor protection | |||
system and engineered | |||
safeguards | |||
are designed in accordance | |||
with IEEE-279, Standard Nuclear Power Plant Protection | |||
System, dated August 1968. Paragraph | |||
4.13 of this Standard states that if the protective | |||
action of some parts of the system has been bypassed or deliberately | |||
rendered inoperable | |||
for any purpose, this fact shall be continuously | |||
indicated | |||
in the control rogm. Contrary to the above, portions of the service water systems can be bypassed and this condition | |||
is not continuously | |||
indicated | |||
in the control room. Specifically, the recirculation | |||
spray inlet and outlet valves SW-104A, B, C, D and SW-105A, B, C, D have a bypass function that allows for manually closing the valves during a Consequence | |||
Limiting Safeguards | |||
HI-HI condition . | |||
DEVIATION | |||
B RESPONSE TO NOTICE OF DEVIATION | |||
INSPECTION | |||
REPORT NOS. 50-280/88-32 | |||
AND 50-281/88-32 | |||
(1) ADMISSION | |||
OR DENIAL OF THE ALLEGED DEVIATION: | |||
The deviation | |||
is incorrect | |||
as stated. The following | |||
items form the basis for the discussion | |||
of continuous | |||
indication | |||
of a bypassed action associated | |||
with protective | |||
systems: A. The Surry Power Station UFSAR (Section 7.2.1, page 7.2-3) indicated | |||
that IEEE 279-1968 is the design basis. B. The following | |||
definitions | |||
and sections are given in IEEE 279-1968: | |||
Protective | |||
Action: An action initiated | |||
by the protective | |||
system when a limit is exceeded. | |||
A protective | |||
action can be at channel or system level. Protective | |||
Function: | |||
A system protective | |||
action which results from the protective | |||
action of the channels monitoring | |||
a particular | |||
plant condition. | |||
Section 4.13 Indication | |||
of Bypasses: | |||
If the protective | |||
action of some part of the system has been bypassed or deliberately | |||
rendered inoperative | |||
for any purpose, this fact shall be continuously | |||
indicated | |||
in the control room. Section 4.16 Completion | |||
of Protective | |||
Action Once It Is Initiated: | |||
The protective | |||
system shall be so designed that, once initiated, a protection | |||
system action shall go to completion. | |||
Return to operation | |||
shall require subsequent | |||
deliberate | |||
operator action. During review of the design change for the Recirculating | |||
Spray Heat Exchanger | |||
Isolation | |||
Valve Logic Change, the NRC inspectors | |||
identified | |||
that the design change incorporated | |||
a manual override feature which bypassed the Consequence | |||
Limiting Safeguards (CLS) HI-HI signal in the | |||
for recirculation | |||
spray heat exchanger (RSHX) service water isolation | |||
valves (MOV-SW-104A, B, C, D; MOV-SW-105A, B, C, D; MOV-SW-204A, B, C, D; and MOV-SW-205A, B, C, D). The manual override feature is initiated | |||
by the manual control switch for the valves and is accomplished | |||
by simply operating | |||
the manu~l control switch to the 11 CLOSE 11 position after the CLS HI-HI signal has fully opened the valve. Plant operators | |||
are required to isolate a RSHX by an Abnormal Procedure | |||
when the RSHX radiation | |||
monitors indicate that there is high radiation | |||
present in the service water discharging | |||
from the RSHXs. The 11 protective | |||
action 11 is the opening of the RSHX SW isolation | |||
valves which cannot be bypassed and the valves will fully open upon a CLS HI-HI signal. The requirement | |||
of Section 4.13 is satisfied | |||
by the fact that the opening of the valves (i.e., the protective | |||
action) cannot be bypassed. | |||
Section 4.16 allows the actuated component | |||
to "return to operation 11 by deliberate | |||
action of a control room operator and no annunciation | |||
requirement | |||
is specified | |||
for that case. | |||
INSPECTION | |||
REPORT NOS. 50-280/88-32 | |||
AND 50-281/88-32 | |||
This position is also consistent | |||
with the guidance provided in Regulatory | |||
Guide 1.47, 11 Bypassed and Inoperable | |||
Status Indication | |||
for Nuclear Power Plant Safety Systems 11. | |||
}} | |||
Latest revision as of 19:04, 5 January 2025
| ML18153B867 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 08/23/1989 |
| From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 89-565, NUDOCS 8908310012 | |
| Download: ML18153B867 (10) | |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 23, 1989 United States Nutlear*Regulatory Commission Attention:
Document Control Desk Washington, D. C.
20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SORRY POWER STATION UNITS 1 AND 2 RESPONSE TO NOTICE OF DEVIATION Serial No.
NL/CGL:vlh Docket Nos.
License Nos.
NRC INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 89-565 Rev. 2 280 50-281 DPR-32 DPR-37 We have reviewed your letter of July 24, 1989 in reference to the inspection conducted at Surry Power Station on September 12-16, September 26-30 and November 14-18, 1988 and reported in Inspection Reports 50-280/88-32 and 50-281/88-32.
Our response to the two deviations described in the Notice of Deviation is provided in the attachment.
We have no objection to this inspection report being made a matter of public disclosure.
If you have further questions, please contact us.
Very truly yours, t
( t 1--C-( : ;. __ SL
\\,:,.) i
~ \\tj /\\'.- _J's,
- w. l.. s tewa rt Senior Vice President - Power Attachment Copy:
U. S. Nuclear Regulatory Commission Regional Administrator Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station 9900310012 giggE~eo PDR ADOCK PNU G
DEVIATION A RESPONSE TO NOTICE OF DEVIATION INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 Description of the Deviation:
Nuclear Regulatory Commission Generic Letter 83-28 dated July 8, 1983, required actions based on generic implication of the Salem ATWS event.
Paragraph 2.2.
of the Enclosure requires that for vendor interface, licensees establish, implement, and maintain a continuing program to ensure that vendor information for safety-related components is complete, current and controlled throughout the life of their plants, and appropriately referenced or incorporated in plant instructions and procedures.
Virginia Power responses to this Generit Letter (Serial No. 617, dated November 4, 1983; Serial No.85-063, dated February 8, 1985; Serial No.85-211, dated May 20, 1985; and Serial No.85-63B, dated August 30, 1985) detailed the program which was implemented for Surry and North Anna Nuclear Plants.
Virginia Power response 85-063 states that revised administrative procedures which improve the availability and adequacy of vendor reference information are in use at each station. These procedures implement the means of collecting and controlling vendor information for use by personnel involved in maintenance, replacement and repair activities.
It further states that controlling Administrative Procedure 93, Vendor Interface Control Documents, at Surry, and Administrative Procedure 6.18, Control of Vendor Manuals, V~ndor Files and Interface, at North Anna, provide the primary activity for controlling vendor information for safety-related equipment.
These procedures provide a method of accumulating reference information.and making the information available to the various work activities. These procedures are currently in.use.
Contrary to the above, the requirements of this program are not being followed, in that, the following examples were identified where appropriate vendor information had not been included in site procedures:
- 1. Calibration procedure CAL
- 466, used to calibrate Rosemount transmitters, does not provide the vendor manual required closing torque (90 in-lbs) for the detector vent and drain valves.
- 2.
There are no site procedures to implement vendor manual (Limitorque) required mechanical preventive maintenance for valves 01-CW-MOV-lOOA, B,
C, D;
01-CW-MOV-106A, B,
C, D;
02-CW-MOV-200A, B,
C, D; or 02-CW-MOV-206A, B, C, D.
- 3.
Site procedures do not include the following Emergency Service Water Diesel vendor recommendations:
- a.
The vendor manual requires a 20 minute wait after running the diesel for a check of the oil level.
- b.
The vendor manual requires a periodic cleaning of the diesel cooling system using a radiator cleaning compound followed by a reverse flush with fresh water.
RESPONSE TO NOTICE OF DEVIATION
- 1NSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32
- c.
The vendor manual requires a periodic check of ihe ~rankc~se pressure.
- d. The vendor manual requires a periodic cleaning of the air box check valves followed by blow out of the lines.
- e.
The vendor manual requires a periodic inspection and cleaning of the blower screen.
- f.
The vendor manual requires a periodic check/change of the lubrication in the reduction gear.
- g.
The vendor manual requires verifying oil pressure is increasing.
- h.
The vendor manual requires checking for oil leaks during pump runs.
- 4.
The Joseph Oats Corporation's Installation, Operation and Maintenance manual for Recirculation Coolers, Revision 2A, states recommendations for a desiccant maintenance program and rust requirements.
Visual observation of Recirculation Spray Heat Exchangers (RSHXs) prior to their being placed into containment identified ripped or torn covers on the RSHXs nozzles and rusting on bolts and flanges.-
Site procedures did not address these vendor recommendations.
DEVIATION A RESPONSE TO NOTICE OF DEVIATION
'INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 (1). ADMISSION OR DENIAL OF THE ALLEGED DEVIATION:
The deviation is correct with the exceptions noted in (3) below.
(2)
REASON FOR THE DEVIATION:
Procedure revisions to address identified vendor recommendations did not*
incorporate or adequately document the subject vendor requirements.
(3)
CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED:
The specific concerns of the deviation are addressed as follows:
Item 1:
Calibration procedure CAL-466 has been updated to include torque requirements for the transmitter vent and drain valves.
Temporary procedure changes will be used to include and document torque requirements in other Rosemount transmitter calibration procedures until the procedures are-revised under the procedure upgrade program.
A memo explaining this requirement has been written and placed in the Instrument Department required reading book.
Item 2:
A mechanical preventive maintenance procedure, which performed vendor technical manual maintenance activities, was implemented in October 1988.
Specific vendor recommended maint~nance was satisfied on the subject valves during the recent outages by performing either the necessary preventive or corrective maintenance.
An upgraded mechanical preventive maintenance procedure for the subject valves based on vendor recommendations, industry standards, and operational experience was implemented in July 1989.
The new procedure includes activities which address specific vendor manual recommendations.
This procedure will be used to perform subsequent mechanical preventive maintenance work on the subject valves.
Item 3a:
The specific wait period for the oil level check has been incorporated into the operating procedure which starts and stops the engine, as well as the applicable periodic test procedures.
The preventive maintenance procedure will be revised as noted in (4) below.
Item 3b:
The heat exchanger for each engine was disassembled and inspected during maintenance performed after the NRC inspection.
The heat exchangers
RESPONSE TO NOTICE OF DEVIATION INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 were found to be clean and unobstructed.
The visible por.tions of both the raw water and the coolant water portions of the system were found to be clean.
Chemical cleaning of the coolant system was determined to be unnecessary (based on visual inspection) and was not performed.
The disassembly and inspection of the heat exchanger was added to the present
- preventive maintenance procedure, which is scheduled to be performed on a 12 month frequency.
Chemical cleaning will be done, if necessary, as a result of visual inspection.
Item 3c:
The engine crankcase pressure was measured during maintenance performed after the NRC inspection and found to be within specification.
A check of crankcase pressure was also added to the current preventive maintenance procedure for the engines, which is scheduled to be performed on a 12 month frequency.
Item 3d:
Emergency Service Water Pump Diesels at Surry Power Station are not equipped with air box check valves.
The vendor manual is written for engines with a variety of applications and options.
This option would likely be used in a turbocharged diesel; the subject engines are not turbocharged.
Therefore, this item is not applicable.
Item 3e:
The blower screen for each engine was cleaned during maintenance performed after the NRC inspection.
No unsatisfactory conditions were noted.
Inspection of the blower screen was added to the existing preventive maintenance procedure, which is scheduled to be performed on a 12 month frequency.
Item 3f:
The reduction gear referred to in the Emergency Service Water Pump Diesel technical manual is not part of equipment installed at Surry.
Therefore, this item is not applicable.
Item 3g:
Specific instructions to verify increasing oil pressure immediately after starting the engine were added to applicable operating procedures and periodic tests.
If the oil pressure indication is not within specification, the engine is to be shut down immediately and the cause of the indication determined before the engine is started again.
The preventive maintenance procedure will be revised as noted in (4) below.
Item 3h:
RESPONSE TO NOTICE OF DEVIATIUN INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 Checking for oil leaks whi1e the engine is running was included in the preventive maintenance procedure in place at the time of the NRC inspection.
The applicable operating and periodic test procedures will be revised as noted in (4) below.
Item 4:
The site procedure SUADM-MM-05, * "Storage of Material at the Station Warehouse and Storeroom", addresses the requirements for maintenance of storage items.
However, this procedure was not the controlling document at*the time of the NRC inspection. A design change package controlled the requirements to be followed prior to installation. The vessels had been shipped from the vendor with anticipation for immediate field preparation for installation.
The desiccant program was not implemented because the vessels were not being stored; instead they were being prepared for installation.
The nozzle covers had been installed at the factory to m1n1m1ze foreign material intrusion.
Prior to installation, the covers were removed and an inspection was performed to ensure cleanliness, as required by the design change contro 11 i ng procedure.
The i den ti fi ed rust was removed from bolts and flanges and the bolts were painted, per the design change controlling procedure.
(4)
CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER DEVIATIONS:
The preventive maintenance procedure for the Emergency Service Water Pump Diesels will be revised to include a 20 minute wait period after starting the diesel before checking the oil level and verifying an increasing oil pressure after starting the engine.
The applicable operating and periodic test procedures will be revised to require checking the Emergency Service Water Pump Diesels for oil leaks when in operation.
A procedure upgrade program, which will include more thorough review and documentation of vendor recommendations, has been initiated.
The calibration procedures for Rosemount transmitters will be revised under this program to include the torquing requirements referenced above.
In addition, the administrative procedure SUADM-ADM-05, "Procedure Review Standard", contains the following items on the procedure review checklist:
Verify that the referenced documents and vendor technical manuals are current and applicable.
Incorporate vendor recommendations, if applicable.
By this procedure, a review must be conducted no less than once every two years.
Site receiving procedures will be reviewed relative to the need to incorporate interim storage requirements.
RESPONSE TO NOTICE OF DEVIATION
'INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 (5)
THE DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED:
The preventive_ maintenance, periodic test, and operating procedures referenced in ( 4) above will' be revised by October 31, 1989.
The Rosemount transmitter calibration procedures will be progranmatically revised to include the applicable torquing requirements under the procedure upgrade program.
(
Reference:
Letter Serial No *.88-387 dated July 13, 1988).
Site receiving procedures wi.l l be reviewed by October 31, 1989.
DEVIATION B RESPONSE TO NOTICE OF DEVIATION INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 Description of-the Deviation:
The Updated Final Safety Analysis Report (UFSAR) Section 7.2.1, states that the reactor protection system and engineered safeguards are designed in accordance with IEEE-279, Standard Nuclear Power Plant Protection System, dated August 1968.
Paragraph 4.13 of this Standard states that if the protective action of some parts of the system has been bypassed or deliberately rendered inoperable for any purpose, this fact shall be continuously indicated in the control rogm.
Contrary to the above, portions of the service water systems can be bypassed and this condition is not continuously indicated in the control room.
Specifically, the recirculation spray inlet and outlet valves SW-104A, B, C, D
and SW-105A, B,
C, D have a bypass function that allows for manually closing the valves during a Consequence Limiting Safeguards HI-HI condition.
DEVIATION B RESPONSE TO NOTICE OF DEVIATION INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 (1)
ADMISSION OR DENIAL OF THE ALLEGED DEVIATION:
The deviation is incorrect as stated.
The following items form the basis for the discussion of continuous indication of a bypassed action associated with protective systems:
A.
The Surry Power Station UFSAR (Section 7.2.1, page 7.2-3) indicated that IEEE 279-1968 is the design basis.
B.
The following definitions and sections are given in IEEE 279-1968:
Protective Action:
An action initiated by the protective system when a limit is exceeded.
A protective action can be at channel or system level.
Protective Function:
A system protective action which results from the protective action of the channels monitoring a particular plant condition.
Section 4.13 Indication of Bypasses:
If the protective action of some part of the system has been bypassed or deliberately rendered inoperative for any purpose, this fact shall be continuously indicated in the control room.
Section 4.16 Completion of Protective Action Once It Is Initiated:
The protective system shall be so designed that, once initiated, a protection system action shall go to completion.
Return to operation shall require subsequent deliberate operator action.
During review of the design change for the Recirculating Spray Heat Exchanger Isolation Valve Logic
- Change, the NRC inspectors identified that the design change incorporated a manual override feature which bypassed the Consequence Limiting Safeguards (CLS)
HI-HI signal in the 11open 11 control circuitry for recirculation spray heat exchanger (RSHX) service water isolation valves (MOV-SW-104A, B,
C, D;
MOV-SW-105A, B,
C, D;
MOV-SW-204A, B, C, D; and MOV-SW-205A, B, C, D).
The manual override feature is initiated by the manual control switch for the valves and is accomplished by simply operating the manu~l control switch to the 11 CLOSE 11 position after the CLS HI-HI signal has fully opened the valve.
Plant operators are required to isolate a RSHX by an Abnormal Procedure when the RSHX radiation monitors indicate that there is high radiation present in the service water discharging from the RSHXs.
The 11 protective action 11 is the opening of the RSHX SW isolation valves which cannot be bypassed and the valves will fully open upon a CLS HI-HI signal.
The requirement of Section 4.13 is satisfied by the fact that the opening of the valves (i.e., the protective action) cannot be bypassed.
Section 4.16 allows the actuated component to "return to operation 11 by deliberate action of a control room operator and no annunciation requirement is specified for that case.
RESPONSE TO NOTICE OF DEVIATION INSPECTION REPORT NOS. 50-280/88-32 AND 50-281/88-32 This position is also consistent with the guidance provided in Regulatory Guide 1.47, 11 Bypassed and Inoperable Status Indication for Nuclear Power Plant Safety Systems 11.