{{#Wiki_filter:NIIC FoIIM 196                                                   U.S. NVCLI!AllIICGVLATOIIv"OMMISSION OOCKET NVMIIIIII IZ16)     ~"       I                                                                                             50-3156 NUMINE I'II.E         A NRC DISTB IDUTION FoII PART 50 DOCI(ET MATERIAL To:     , B.C; Rusche                                   F<<<<:Indiana     8 Michigan Power Co.             OATE OF OOCVMENT New York, .N.Y.
{{#Wiki_filter:NIIC FoIIM 196 U.S. NVCLI!AllIICGVLATOIIv"OMMISSION IZ16) ~"
J.R. Burton                                 OhTE AECEIVEO I ALETTEA                     .LINOTOAIZEO                 PFIOP                   INPUT FOAM               NUMOFA OF COPIES AECEIVEO Ixl oA I G INAL          QVNC LASS IF I E 0 I              V C3 COP OESCAIPTION                                                               ENCLOSURE Ltr. notarized 6-'11-76...
I NRC DISTBIDUTION FoII PART 50 DOCI(ET MATERIAL OOCKET NVMIIIIII 50-3156 I'II.E NUMINE A
Request for a two week exteI)sion deadline for.                                         ACKNOWLEDGED surveillance testing from June 26, 1976 to.
To:
July 10,, 1976.....;                                                                   DO NOT REMOVE
, B.C; Rusche F<<<<:Indiana 8 Michigan Power Co.
( 1     Signed Cy, Receivedf       .
New York,.N.Y.
(2 Pages)
J.R.
PLANT         KQZ:       Cook II' SAFETY                                     FOR ACTION/INF0 Rh1AT I ON                  ENVXRO ASSIGNED AD:                                                                ASSXGNED AD .
Burton OATE OF OOCVMENT OhTE AECEIVEO I ALETTEA I
BRANCH ASST')e CHIEF:
IxloA IG INAL C3 COP V
.LINOTOAIZEO QVNCLASS IF I E 0 PFIOP INPUT FOAM NUMOFA OF COPIES AECEIVEO OESCAIPTION Ltr. notarized 6-'11-76...
Request for a two week exteI)sion deadline for.
surveillance testing from June 26, 1976 to.
July 10,, 1976.....;
(
1 Signed Cy, Receivedf (2 Pages)
ENCLOSURE ACKNOWLEDGED DO NOT REMOVE PLANT KQZ:
Cook II' SAFETY ASSIGNED AD:
FOR ACTION/INF0 Rh1AT ION ASSXGNED AD.
ENVXRO BRANCH CHIEF:
P OJECT KKNAGER:
P OJECT KKNAGER:
XC ~
XC ~ ASST')e BRANCEl CEIXEF
BRANCEl CEIXEF ~
~
PROJECT IIANAGER ..
PROJECT IIANAGER LXC ~ ASST, FIL NRC PDR I & E ~
LXC ~ ASST, INTERNAL D ISTRI BUTION FIL                       aXZrrxmc:E                                                              KLXR NRC PDR                               EXHEHA                                                              ERNST I   & E     ~   2                         QJii} l                    BENAROYA                              AT,T.ARD
2
            @ET D                                                                                                     SPANGLER GOSSXCK       6 STAFF             ENGINEER N                          XPPOLITO XE                                                                                                     SXTE TECII QASE                               KNIGHT                              OPERATING REACTORS                  GAI ~ulILL IANA                             SXH"IEXL                            STELLO.                            STEPP LE                           PAHLICKX                                                                H ULIIAN OPERATXiNG TECH PROJECT MhNAGEIIENT                 REACTOR SAFETY                    E IS F.iilIUT                        SITE ANAT.YSIS I             OXD                             ROSS                                SIIAO                              VOLLHER PE     COLLINS                     NOVAK                              BAER                                BUi'ICII IIOUSTON                           ROSZTOCZY                          SCIIUI'.NCI'.R                      J ~ COLLINS PETERSOI'I                         CIIECK                             GRIi IES                            KREGER Hl.'LTZ I IEI TEHES                        AT 6    I                         ST.TI'. SAFI'.TY fc   E~TR SKOVIIOLT                          SALTZIIAN                          h IIAI.YSTS RIITIIFI~G                          )ENTON   6 IIUI.T.l".R EX'I'L<<NALDISTR II3UTION                                                  CONT<<OL NUMI3IIIT NATI, IAB                          13ROOI:IIAVI'.N NATI. IA13 TIC                                RI'.G ~  V-II,"                    Ul. IQ KS ON (Ol!NI.)
@ET D GOSSXCK 6 STAFF XE QASE IANA LE PROJECT MhNAGEIIENT I
NSX                                I.A Pl)R                                                                      5982 AS    I.II                          C()NS UI.TAN'fS
OXD PE COLLINS IIOUSTON PETERSOI'I Hl.'LTZ IIEI TEHES SKOVIIOLT TIC NSX AS I.II
      ~Ci~S~IOr.nXnalrl'i              I:
~Ci~S~IOr.nXnalrl'i I:
INTERNALD aXZrrxmc:E EXHEHA QJii}l ENGINEER N KNIGHT SXH"IEXL PAHLICKX REACTOR SAFETY ROSS NOVAK ROSZTOCZY CIIECK AT 6 I SALTZIIAN RIITIIFI~G EX'I'L<<NALDISTR II3UTION NATI, IAB RI'.G ~ V-II,"
I.A Pl)R C()NS UI.TAN'fS ISTRI BUTION BENAROYA XPPOLITO OPERATING REACTORS STELLO.
OPERATXiNG TECH EISF.iilIUT SIIAO BAER SCIIUI'.NCI'.R GRIiIES ST.TI'. SAFI'.TY fc E~TR h IIAI.YSTS
)ENTON 6 IIUI.T.l".R 13ROOI:IIAVI'.N NATI. IA13 Ul.IQKS ON (Ol!NI.)
KLXR ERNST AT,T.ARD SPANGLER SXTE TECII GAI~ulILL STEPP HULIIAN SITE ANAT.YSIS VOLLHER BUi'ICII J ~ COLLINS KREGER CONT<<OL NUMI3IIIT 5982


                                                                                            '
V VIVVVV.V.,", "qo'
V - VIVVV V                                                                              ~
~ArV~V)It
            .V.,", "qo'
~
                ~ArV~V) It
')V)~ ! "ffiPV)V
                                                                            ')V)~ ! "ffiPV)V     . f9'3 A AL gfgt'g V A" )'"Q gA ~ '~   VVtI'I, )VVV ) V
. f9'3 A AL gfgt'g V
                                                                                "
A" )'"Q gA
Vg )       P ))'l AAI "V4")'>> 'ltQ'f <     )fl4P."         '"t )   < t')V
~'~
                                                                                                      ""'-'VI'V
VVtI'I, )VVV
)
V Vg )
P ))'l AAI "V4")'>> 'ltQ'f <
)fl4P."
'"t )
< t')V
""'-'VI'V


LjIeggfitafy     gg   gy" INDIANA II MICHIGAN POWER COMPANY P. O. BOX 18 BO WL I N G G R E EN STAT ION NEW YORK,     N.. 0 04
LjIeggfitafy gg gy" INDIANA II MICHIGAN POWER COMPANY P. O. BOX 18 BO WL I N G G R E EN STAT ION NEW YORK, N..
                                                                    ~~aaexame       8 VNI~
0 04
CF' Donald C. Cook Nuclear Docket No. 50-315 DPR No. 58                                                         June l~l, 1976 Nr. Bernard Rusche, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
~~aaexame 8
VNI~
Donald C.
Cook Nuclear Docket No. 50-315 DPR No.
58 CF' June l~l, 1976 Nr. Bernard
: Rusche, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555


==Dear Mr. Rusche:==
==Dear Mr. Rusche:==
We hereby request a temporary extension of the Technical Specification surveillance testing time interval for the Donald C.
We hereby request a temporary extension of the Technical Specification surveillance testing time interval for the Donald C.
Cook Nuclear Plant Unit 1 diesel generators.               Surveillance Require-ment 4.8.1.1.2.b requires that each             diesel generator be demonstrated operable at least once per 18 months during             shutdown by conducting a series of inspections, trips, startup on safety injection signal and loadings.     This requirement is in addition to the 31 day load-ing tests conducted per Surveillance Requirement 4.8.1.1.2.a which are being performed in accordance with the requirements.
Cook Nuclear Plant Unit 1 diesel generators.
The 18 month time         interval for the   above extensive diesel generator testing, including the           allowable   extension per Surveillance Requirement 4.0.2.a, ends on June 26, 1976.               We had planned on shutting.;down the Unit over a weekend in June 1976 to conduct the tests. However, due to forced outages and curtailments of other units and to system load requirements,             it is essential that the Donald C. Cook Nuclear Plant, Unit 1 be kept in service until the long 4th of July weekend.
Surveillance Require-ment 4.8.1.1.2.b requires that each diesel generator be demonstrated operable at least once per 18 months during shutdown by conducting a series of inspections, trips, startup on safety injection signal and loadings.
This requirement is in addition to the 31 day load-ing tests conducted per Surveillance Requirement 4.8.1.1.2.a which are being performed in accordance with the requirements.
The 18 month time interval for the above extensive diesel generator testing, including the allowable extension per Surveillance Requirement 4.0.2.a, ends on June 26, 1976.
We had planned on shutting.;down the Unit over a weekend in June 1976 to conduct the tests.
: However, due to forced outages and curtailments of other units and to system load requirements, it is essential that the Donald C.
Cook Nuclear Plant, Unit 1 be kept in service until the long 4th of July weekend.


  ~ ~
~
      ~ ~
~
~ ~
~
~
~
~


Nr. Bernard Rusche                                                 June ll, 1976 We   therefore request a two week extension of the deadline for surveillance testing per 4.8.1.1.2.b from June 26, 1976 to July 10, 1976.
Nr. Bernard Rusche June ll, 1976 We therefore request a two week extension of the deadline for surveillance testing per 4.8.1.1.2.b from June 26, 1976 to July 10, 1976.
Very truly yours, John R. Burton Secretary Sworn       to   and subscribed to before me   this     11th day of June 1976 in New   York County,             New   York Notary       ublic KATHLEEN BARRY NOTARY PUfluC, State ol New York No. 41-4606/92 Qualified ln Queens Ccunty Certifiate filed in New York County Cctr.nutation inspires church 30, fP77 cc:       Gerald Charnoff R. J.       Vollen R. C.       Callen P. W.       Steketee R. Walsh John Tillinghast R. S. Hunter R. W. Jurgensen
Very truly yours, John R. Burton Secretary Sworn to and subscribed to before me this 11th day of June 1976 in New York County, New York Notary ublic KATHLEEN BARRY NOTARY PUfluC, State ol New York No. 41-4606/92 Qualified ln Queens Ccunty Certifiate filed in New York County Cctr.nutation inspires church 30, fP77 cc:
Gerald Charnoff R. J. Vollen R.
C. Callen P.
W. Steketee R. Walsh John Tillinghast R. S. Hunter R.
W. Jurgensen


              '0 Pi ~
'0 Pi ~
~ ~ ~ ~ ~
~
~
~
~
~
l V
l V
Ji}}
Ji}}

Latest revision as of 15:29, 5 January 2025

Request Temporarily Two Week Extension of Technical Specification Surveillance Testing Time from 6/26/1976 to 7/10/1976
ML18219E084
Person / Time
Site: Cook  
Issue date: 06/11/1976
From: Burton J
Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co)
To: Rusche B
Office of Nuclear Reactor Regulation
References
Download: ML18219E084 (6)


Text

NIIC FoIIM 196 U.S. NVCLI!AllIICGVLATOIIv"OMMISSION IZ16) ~"

I NRC DISTBIDUTION FoII PART 50 DOCI(ET MATERIAL OOCKET NVMIIIIII 50-3156 I'II.E NUMINE A

To:

, B.C; Rusche F<<<<:Indiana 8 Michigan Power Co.

New York,.N.Y.

J.R.

Burton OATE OF OOCVMENT OhTE AECEIVEO I ALETTEA I

IxloA IG INAL C3 COP V

.LINOTOAIZEO QVNCLASS IF I E 0 PFIOP INPUT FOAM NUMOFA OF COPIES AECEIVEO OESCAIPTION Ltr. notarized 6-'11-76...

Request for a two week exteI)sion deadline for.

surveillance testing from June 26, 1976 to.

July 10,, 1976.....;

(

1 Signed Cy, Receivedf (2 Pages)

ENCLOSURE ACKNOWLEDGED DO NOT REMOVE PLANT KQZ:

Cook II' SAFETY ASSIGNED AD:

FOR ACTION/INF0 Rh1AT ION ASSXGNED AD.

ENVXRO BRANCH CHIEF:

P OJECT KKNAGER:

XC ~ ASST')e BRANCEl CEIXEF

~

PROJECT IIANAGER LXC ~ ASST, FIL NRC PDR I & E ~

2

@ET D GOSSXCK 6 STAFF XE QASE IANA LE PROJECT MhNAGEIIENT I

OXD PE COLLINS IIOUSTON PETERSOI'I Hl.'LTZ IIEI TEHES SKOVIIOLT TIC NSX AS I.II

~Ci~S~IOr.nXnalrl'i I:

INTERNALD aXZrrxmc:E EXHEHA QJii}l ENGINEER N KNIGHT SXH"IEXL PAHLICKX REACTOR SAFETY ROSS NOVAK ROSZTOCZY CIIECK AT 6 I SALTZIIAN RIITIIFI~G EX'I'L<<NALDISTR II3UTION NATI, IAB RI'.G ~ V-II,"

I.A Pl)R C()NS UI.TAN'fS ISTRI BUTION BENAROYA XPPOLITO OPERATING REACTORS STELLO.

OPERATXiNG TECH EISF.iilIUT SIIAO BAER SCIIUI'.NCI'.R GRIiIES ST.TI'. SAFI'.TY fc E~TR h IIAI.YSTS

)ENTON 6 IIUI.T.l".R 13ROOI:IIAVI'.N NATI. IA13 Ul.IQKS ON (Ol!NI.)

KLXR ERNST AT,T.ARD SPANGLER SXTE TECII GAI~ulILL STEPP HULIIAN SITE ANAT.YSIS VOLLHER BUi'ICII J ~ COLLINS KREGER CONT<

    > 'ltQ'f < )fl4P." '"t ) < t')V ""'-'VI'V LjIeggfitafy gg gy" INDIANA II MICHIGAN POWER COMPANY P. O. BOX 18 BO WL I N G G R E EN STAT ION NEW YORK, N.. 0 04 ~~aaexame 8 VNI~ Donald C. Cook Nuclear Docket No. 50-315 DPR No. 58 CF' June l~l, 1976 Nr. Bernard
    Rusche, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
    20555

    Dear Mr. Rusche:

    We hereby request a temporary extension of the Technical Specification surveillance testing time interval for the Donald C.

    Cook Nuclear Plant Unit 1 diesel generators.

    Surveillance Require-ment 4.8.1.1.2.b requires that each diesel generator be demonstrated operable at least once per 18 months during shutdown by conducting a series of inspections, trips, startup on safety injection signal and loadings.

    This requirement is in addition to the 31 day load-ing tests conducted per Surveillance Requirement 4.8.1.1.2.a which are being performed in accordance with the requirements.

    The 18 month time interval for the above extensive diesel generator testing, including the allowable extension per Surveillance Requirement 4.0.2.a, ends on June 26, 1976.

    We had planned on shutting.;down the Unit over a weekend in June 1976 to conduct the tests.

    However, due to forced outages and curtailments of other units and to system load requirements, it is essential that the Donald C.

    Cook Nuclear Plant, Unit 1 be kept in service until the long 4th of July weekend.

    ~

    ~

    ~

    ~

    ~

    ~

    Nr. Bernard Rusche June ll, 1976 We therefore request a two week extension of the deadline for surveillance testing per 4.8.1.1.2.b from June 26, 1976 to July 10, 1976.

    Very truly yours, John R. Burton Secretary Sworn to and subscribed to before me this 11th day of June 1976 in New York County, New York Notary ublic KATHLEEN BARRY NOTARY PUfluC, State ol New York No. 41-4606/92 Qualified ln Queens Ccunty Certifiate filed in New York County Cctr.nutation inspires church 30, fP77 cc: