| number = ML18354A823
| number = ML18354A823
| issue date = 12/20/2018
| issue date = 12/20/2018
| title = 3, River Bend Station, and Palisades Nuclear Plant - Schedule Change to Open Phase Condition Detection Implementation
| title = And Palisades Nuclear Plant - Schedule Change to Open Phase Condition Detection Implementation
| author name = Halter M K
| author name = Halter M
| author affiliation = Entergy Nuclear Operations, Inc, Entergy Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc, Entergy Operations, Inc
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:*
{{#Wiki_filter:*  
Entergy Operations, Inc. Entergy Nuclear Operations, Inc. 1340 Echelon Parkway Jackson , MS 39213 Tel601-368-5573 Mandy K. Halter Director , Nuclear Licensing 10 CFR 50 CNR02018-00053 December 20, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington , DC 20555-0001  
~Entergr.
Entergy Operations, Inc.
Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Tel601-368-5573 Mandy K. Halter Director, Nuclear Licensing 10 CFR 50 CNR02018-00053 December 20, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  


==Subject:==
==Subject:==
Schedule Change to Open Phase Condition Detection Implementation Grand Gulf Nuclear Stat i on, Unit 1 Docket No. 50-416 License No. NPF-29 River Bend Station, Unit 1 Docket No. 50-458 License No. NPF-47 Waterford 3 Steam Electric Station Docket No. 50-382 License No. NPF-38 Palisades Nuclear Plant Docket 50-255 License No. DPR-20  
Schedule Change to Open Phase Condition Detection Implementation Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29 River Bend Station, Unit 1 Docket No. 50-458 License No. NPF-47 Waterford 3 Steam Electric Station Docket No. 50-382 License No. NPF-38 Palisades Nuclear Plant Docket 50-255 License No. DPR-20  


==Reference:==
==Reference:==
: 1. Nuclear Energy Institute letter to the NRC, Industry Initiative on Open Phase Condition, dated October 9, 2013 , (Accession No. ML 13333A147). 2. Nuclear Energy Institute letter to the NRC, "Industry Initiative on Open Phase Condition, Revision 1, dated March 16 , 2015, (Accession No. ML 15075A455).  
: 1. Nuclear Energy Institute letter to the NRC, Industry Initiative on Open Phase Condition, dated October 9, 2013, (Accession No. ML13333A147).
: 3. Entergy Letter to NRC, "Nuclear Energy Institute Commitments", dated March 9, 2018, (Letter Number CNR0-2018-0006). 4. Nuclear Energy Institute letter to the NRC , "Industry Initiative on Open Phase Condition, Revision 2, dated September 20, 2018, (Accession No. ML 18268A114).  
: 2. Nuclear Energy Institute letter to the NRC, "Industry Initiative on Open Phase Condition, Revision 1, dated March 16, 2015, (Accession No. ML15075A455).
: 5. Entergy Letter to NRC, " Request for Additional Information Regarding Response to Bulletin 2012-01, " Design Vulnerability in Electric Power System", dated December 20, 2013." dated February 3, 2014, (Letter Number GNR0-2014/00009). 6. Entergy Letter to NRC, "Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System," dated January 31, 2014, (Letter Number RBG-47430).
: 3. Entergy Letter to NRC, "Nuclear Energy Institute Commitments", dated March 9, 2018, (Letter Number CNR0-2018-0006).
CNR02018-00053 Page 2 of 2 7. Entergy Letter to NRC, "Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System", dated February 3, 2014, (Letter Number W3F1-2014-0008). 8. Entergy Letter to NRC, "Response to Request for Additional Information NRC Bulletin 2012-01", dated January 30, 2014, (Letter Number PNP 2014-007).
: 4. Nuclear Energy Institute letter to the NRC, "Industry Initiative on Open Phase Condition, Revision 2, dated September 20, 2018, (Accession No. ML18268A114).
Entergy Operations, Inc. and Entergy Nuclear Operations, Inc. (Entergy) are revising the implementation schedule for open phase condition for Grand Gulf Nuclear Station, River Bend Station, Waterford 3 Steam Electric Station, and Palisades Nuclear Plant. In 2014, these plants committed to the generic schedule as provided in Nuclear Energy Institute (NEI) Industry Initiative on Open Phase Condition (Reference 1 ). Subsequently, in Reference 2, NEI revised the voluntary industry initiative generic schedule for Open Phase. Entergy withdrew its membership from NEI in February 2018, as discussed in Reference 3, but the withdrawal did not impact prior commitments to NEI documents or commitments made by NEI on behalf of Entergy. Recently, NEI revised the implementation schedule in Reference  
: 5. Entergy Letter to NRC, "Request for Additional Information Regarding Response to Bulletin 2012-01, "Design Vulnerability in Electric Power System", dated December 20, 2013." dated February 3, 2014, (Letter Number GNR0-2014/00009).
: 4. Entergy is no longer a member of NEI; however, Grand Gulf Nuclear Station, River Bend Station, and Waterford 3 Steam Electric Station will adhere to the implementation schedule established in Reference  
: 6. Entergy Letter to NRC, "Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System," dated January 31, 2014, (Letter Number RBG-47430).  
: 4. Palisades has established an implementation date of December 31, 2020 for their Safeguards Transformer 1-1, which is also consistent with Reference  
 
: 4. References 5 through 8 provided a summary of the interim corrective actions taken at Grand Gulf Nuclear Station, River Bend Station, Waterford 3 Steam Electric Station, and Palisades Nuclear Plant to ensure plant operators can promptly diagnose and respond to an open phase condition.
CNR02018-00053 Page 2 of 2
However, consistent with Reference 4, these plants, except as noted above for Palisades, have implemented design changes in a monitoring mode with an alarm response process for operators to take action if the system detects the presence of an open phase condition.
: 7. Entergy Letter to NRC, "Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System", dated February 3, 2014, (Letter Number W3F1-2014-0008).
These actions supersede the interim corrective actions. This letter contains no new regulatory commitments.
: 8. Entergy Letter to NRC, "Response to Request for Additional Information NRC Bulletin 2012-01", dated January 30, 2014, (Letter Number PNP 2014-007).
If you have any questions, please contact Mr. Philip Couture, Manager, Fleet Licensing Programs, at (601) 368-5102.
Entergy Operations, Inc. and Entergy Nuclear Operations, Inc. (Entergy) are revising the implementation schedule for open phase condition for Grand Gulf Nuclear Station, River Bend Station, Waterford 3 Steam Electric Station, and Palisades Nuclear Plant. In 2014, these plants committed to the generic schedule as provided in Nuclear Energy Institute (NEI)
Respectfully , Mandy K. Halter MKH/gpn cc: NRC Regional Administrator (Regions Ill and IV) NRC Project Managers (Entergy, (GGNS , PAL, RBS, WF3) NRC Senior Resident Inspector (GGNS, PAL, RBS, WF3)}}
Industry Initiative on Open Phase Condition (Reference 1 ). Subsequently, in Reference 2, NEI revised the voluntary industry initiative generic schedule for Open Phase. Entergy withdrew its membership from NEI in February 2018, as discussed in Reference 3, but the withdrawal did not impact prior commitments to NEI documents or commitments made by NEI on behalf of Entergy. Recently, NEI revised the implementation schedule in Reference 4. Entergy is no longer a member of NEI; however, Grand Gulf Nuclear Station, River Bend Station, and Waterford 3 Steam Electric Station will adhere to the implementation schedule established in Reference 4. Palisades has established an implementation date of December 31, 2020 for their Safeguards Transformer 1-1, which is also consistent with Reference 4.
References 5 through 8 provided a summary of the interim corrective actions taken at Grand Gulf Nuclear Station, River Bend Station, Waterford 3 Steam Electric Station, and Palisades Nuclear Plant to ensure plant operators can promptly diagnose and respond to an open phase condition. However, consistent with Reference 4, these plants, except as noted above for Palisades, have implemented design changes in a monitoring mode with an alarm response process for operators to take action if the system detects the presence of an open phase condition. These actions supersede the interim corrective actions.
This letter contains no new regulatory commitments. If you have any questions, please contact Mr. Philip Couture, Manager, Fleet Licensing Programs, at (601) 368-5102.
Respectfully, Mandy K. Halter MKH/gpn cc:
NRC Regional Administrator (Regions Ill and IV)
NRC Project Managers (Entergy, (GGNS, PAL, RBS, WF3)
NRC Senior Resident Inspector (GGNS, PAL, RBS, WF3)}}

Latest revision as of 07:26, 5 January 2025

And Palisades Nuclear Plant - Schedule Change to Open Phase Condition Detection Implementation
ML18354A823
Person / Time
Site: Palisades, Grand Gulf, River Bend, Waterford  Entergy icon.png
Issue date: 12/20/2018
From: Halter M
Entergy Nuclear Operations, Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNRO2018-00053
Download: ML18354A823 (2)


Text

~Entergr.

Entergy Operations, Inc.

Entergy Nuclear Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Tel601-368-5573 Mandy K. Halter Director, Nuclear Licensing 10 CFR 50 CNR02018-00053 December 20, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Schedule Change to Open Phase Condition Detection Implementation Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29 River Bend Station, Unit 1 Docket No. 50-458 License No. NPF-47 Waterford 3 Steam Electric Station Docket No. 50-382 License No. NPF-38 Palisades Nuclear Plant Docket 50-255 License No. DPR-20

Reference:

1. Nuclear Energy Institute letter to the NRC, Industry Initiative on Open Phase Condition, dated October 9, 2013, (Accession No. ML13333A147).
2. Nuclear Energy Institute letter to the NRC, "Industry Initiative on Open Phase Condition, Revision 1, dated March 16, 2015, (Accession No. ML15075A455).
3. Entergy Letter to NRC, "Nuclear Energy Institute Commitments", dated March 9, 2018, (Letter Number CNR0-2018-0006).
4. Nuclear Energy Institute letter to the NRC, "Industry Initiative on Open Phase Condition, Revision 2, dated September 20, 2018, (Accession No. ML18268A114).
5. Entergy Letter to NRC, "Request for Additional Information Regarding Response to Bulletin 2012-01, "Design Vulnerability in Electric Power System", dated December 20, 2013." dated February 3, 2014, (Letter Number GNR0-2014/00009).
6. Entergy Letter to NRC, "Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System," dated January 31, 2014, (Letter Number RBG-47430).

CNR02018-00053 Page 2 of 2

7. Entergy Letter to NRC, "Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System", dated February 3, 2014, (Letter Number W3F1-2014-0008).
8. Entergy Letter to NRC, "Response to Request for Additional Information NRC Bulletin 2012-01", dated January 30, 2014, (Letter Number PNP 2014-007).

Entergy Operations, Inc. and Entergy Nuclear Operations, Inc. (Entergy) are revising the implementation schedule for open phase condition for Grand Gulf Nuclear Station, River Bend Station, Waterford 3 Steam Electric Station, and Palisades Nuclear Plant. In 2014, these plants committed to the generic schedule as provided in Nuclear Energy Institute (NEI)

Industry Initiative on Open Phase Condition (Reference 1 ). Subsequently, in Reference 2, NEI revised the voluntary industry initiative generic schedule for Open Phase. Entergy withdrew its membership from NEI in February 2018, as discussed in Reference 3, but the withdrawal did not impact prior commitments to NEI documents or commitments made by NEI on behalf of Entergy. Recently, NEI revised the implementation schedule in Reference 4. Entergy is no longer a member of NEI; however, Grand Gulf Nuclear Station, River Bend Station, and Waterford 3 Steam Electric Station will adhere to the implementation schedule established in Reference 4. Palisades has established an implementation date of December 31, 2020 for their Safeguards Transformer 1-1, which is also consistent with Reference 4.

References 5 through 8 provided a summary of the interim corrective actions taken at Grand Gulf Nuclear Station, River Bend Station, Waterford 3 Steam Electric Station, and Palisades Nuclear Plant to ensure plant operators can promptly diagnose and respond to an open phase condition. However, consistent with Reference 4, these plants, except as noted above for Palisades, have implemented design changes in a monitoring mode with an alarm response process for operators to take action if the system detects the presence of an open phase condition. These actions supersede the interim corrective actions.

This letter contains no new regulatory commitments. If you have any questions, please contact Mr. Philip Couture, Manager, Fleet Licensing Programs, at (601) 368-5102.

Respectfully, Mandy K. Halter MKH/gpn cc:

NRC Regional Administrator (Regions Ill and IV)

NRC Project Managers (Entergy, (GGNS, PAL, RBS, WF3)

NRC Senior Resident Inspector (GGNS, PAL, RBS, WF3)