ML18361A865: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18361A865
| number = ML18361A865
| issue date = 12/27/2018
| issue date = 12/27/2018
| title = Columbia Generating Station - Acknowledgement of Response to NRC Baseline Inspection Report 05000397/2018003 and Disputed Non-Cited Violation
| title = Acknowledgement of Response to NRC Baseline Inspection Report 05000397/2018003 and Disputed Non-Cited Violation
| author name = Gepford H J
| author name = Gepford H
| author affiliation = NRC/RGN-IV/DRS/PSB-2
| author affiliation = NRC/RGN-IV/DRS/PSB-2
| addressee name = Sawatzke B J
| addressee name = Sawatzke B
| addressee affiliation = Energy Northwest
| addressee affiliation = Energy Northwest
| docket = 05000397
| docket = 05000397
| license number = NPF-021
| license number = NPF-021
| contact person = Gepford H J
| contact person = Gepford H
| case reference number = EA-18-173
| case reference number = EA-18-173
| document report number = IR 2018003
| document report number = IR 2018003
Line 15: Line 15:
| page count = 2
| page count = 2
}}
}}
See also: [[followed by::IR 05000397/2018003]]
See also: [[see also::IR 05000397/2018003]]


=Text=
=Text=
{{#Wiki_filter:/RA/  
{{#Wiki_filter:December 27, 2018
 
 
EA-18-173
Mr. Brad Sawatzke
Chief Executive Officer
Energy Northwest
MD 1023
P.O. Box 968
Richland, WA  99352
SUBJECT:
COLUMBIA GENERATING STATION - ACKNOWLEDGMENT OF RESPONSE
TO NRC BASELINE INSPECTION REPORT 05000397/2018003 AND
DISPUTED NON-CITED VIOLATION 
Dear Mr. Sawatzke:
This letter acknowledges your November 29, 2018, correspondence (ML18333A389) 
in response to the U.S. Nuclear Regulatory Commission (NRC) Inspection 
Report 05000397/2018003 (ML18304A362), dated October 31, 2018.  In the inspection report,
the NRC documented a Green non-cited violation (NCV) that was the subject of your response: 
NCV 05000397/2018003-02, Green NCV of Technical Specification 5.7.2 for failure to control
workers in a high radiation area exceeding 1.0 rem/hr.  The cover letter to the inspection report
requested you to respond in writing within 30 days if you contested any of the violations. 
On November 29, 2018, the NRC received a letter from you contesting this NCV.  The NRC is
currently reviewing your basis for contesting the violation in accordance with Section 2.2.7 of the
Enforcement Manual.  Accordingly, we will provide the results of our evaluations by written
response within 90 days of the receipt of your letter. 
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
Withholding. 
Sincerely,
/RA/  
Heather J. Gepford, Chief 
Plant Support Branch 2
Division of Reactor Safety
Docket No. 50-397
License No. NPF-21
cc:  Electronic Distribution




  ML18361A865
SUNSI Review 
ADAMS: 
Non-Publicly Available
Non-Sensitive
Keyword: 
By:  HJG
Yes    No
Publicly Available
Sensitive 
    NRC-002
OFFICE
C:PSB2
C:DRP/A
C:PSB2
D:DRS
C:PSB2
NAME
HGepford
MHaire
HGepford
MShaffer
HGepford
SIGNATURE
/RA/
/RA/
/RA/
/RA REL for/
/RA/
   
   
 
DATE
 
12/21/2018  
 
12/21/2018  
 
12/21/2018  
 
12/27/2018  
 
12/27/2018
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
/RA/ /RA/ /RA/ /RA REL for/ /RA/ 12/21/2018 12/21/2018 12/21/2018 12/27/2018 12/27/2018
}}
}}

Latest revision as of 06:54, 5 January 2025

Acknowledgement of Response to NRC Baseline Inspection Report 05000397/2018003 and Disputed Non-Cited Violation
ML18361A865
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/27/2018
From: Heather Gepford
NRC/RGN-IV/DRS/PSB-2
To: Sawatzke B
Energy Northwest
Gepford H
References
EA-18-173 IR 2018003
Download: ML18361A865 (2)


See also: IR 05000397/2018003

Text

December 27, 2018

EA-18-173

Mr. Brad Sawatzke

Chief Executive Officer

Energy Northwest

MD 1023

P.O. Box 968

Richland, WA 99352

SUBJECT:

COLUMBIA GENERATING STATION - ACKNOWLEDGMENT OF RESPONSE

TO NRC BASELINE INSPECTION REPORT 05000397/2018003 AND

DISPUTED NON-CITED VIOLATION

Dear Mr. Sawatzke:

This letter acknowledges your November 29, 2018, correspondence (ML18333A389)

in response to the U.S. Nuclear Regulatory Commission (NRC) Inspection

Report 05000397/2018003 (ML18304A362), dated October 31, 2018. In the inspection report,

the NRC documented a Green non-cited violation (NCV) that was the subject of your response:

NCV 05000397/2018003-02, Green NCV of Technical Specification 5.7.2 for failure to control

workers in a high radiation area exceeding 1.0 rem/hr. The cover letter to the inspection report

requested you to respond in writing within 30 days if you contested any of the violations.

On November 29, 2018, the NRC received a letter from you contesting this NCV. The NRC is

currently reviewing your basis for contesting the violation in accordance with Section 2.2.7 of the

Enforcement Manual. Accordingly, we will provide the results of our evaluations by written

response within 90 days of the receipt of your letter.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Heather J. Gepford, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket No. 50-397

License No. NPF-21

cc: Electronic Distribution

ML18361A865

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: HJG

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

C:PSB2

C:DRP/A

C:PSB2

D:DRS

C:PSB2

NAME

HGepford

MHaire

HGepford

MShaffer

HGepford

SIGNATURE

/RA/

/RA/

/RA/

/RA REL for/

/RA/

DATE

12/21/2018

12/21/2018

12/21/2018

12/27/2018

12/27/2018