ML19209B082: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:P                                                                                                                                                           I
{{#Wiki_filter:P I
  =.. s*
=..
                                    ~
s*
nurED CORRESPONDENCE g
nurED CORRESPONDENCE g
ISHAM,' LINCOLN & BEALE tow.ms       .sma.. ors...os                           covusaons 4r Law                                    was..m.vo. On,Cc-mosame t. umcota. isn.ises                                                                                 .C . 0 ime Sr.ccr. ..
~
wt46sAes a stAtt.tses.es33                                                                             wAsa =oTO=.O.c.aCO3e                   -
ISHAM,' LINCOLN & BEALE covusaons 4r Law tow.ms
CNC FIRST N AflON AL PLAZA 202= 433 9730 FORTY SCCOND PLOOR CMAmLts A.samt               owio J.mosso                   CmCAGO,ILLINOss 40603         wether s. Antason otAse A. asumo                                                                                                             Em w. mAsswee comato E.wacise                                               otoNety A. Amotason             wven m.eescomes.Ja.
.sma.. ors...os was..m.vo. On,Cc-mosame t. umcota. isn.ises
wiLSiaes w. canzow           so .e L.seecAus6Amo         3'8* 78 8
.C. 0 ime Sr.ccr...
* F500 TELER:2= Sage   sean     a? c. s               wits     s. aeemar. J8t.
wt46sAes a stAtt.tses.es33 CNC FIRST N AflON AL PLAZA wAsa =oTO=.O.c.aCO3e 202= 433 9730 FORTY SCCOND PLOOR CMAmLts A.samt owio J.mosso CmCAGO,ILLINOss 40603 wether s. Antason Em w. mAsswee otAse A. asumo comato E.wacise otoNety A. Amotason wven m.eescomes.Ja.
Fatotescat m. CAmson         LAustmCE s. 6Asse nicwAmo e.reneusom           nostot A.vo6kse                                               ALAm m setLAusste               stresse E.setasose micMamo su costwit           comicwano doessesoes                                         sam mostat t.cmonim              senato o.monotL6            .t? g
wiLSiaes w. canzow so.e L.seecAus6Amo 3'8* 78 8
                                                                                  ,g            son,t,sg,s.g,s,u,nees,
* F500 TELER:2= Sage sean a? c. s wits
                                                                                                                  ,,,            ,m,,,e,,s,m,e,sN,,
: s. aeemar. J8t.
                                                                                                                                                ,   ,,8,,,
Fatotescat m. CAmson LAustmCE s. 6Asse nicwAmo e.reneusom nostot A.vo6kse ALAm m setLAusste stresse E.setasose micMamo su costwit comicwano doessesoes son,t,s s. s,u,nees,
                                                                                  "J tittaa semake mostaf woop TW6Las otame o.ostan6Amo                                             o. misse cotson.nr               svevres m.senApts Jowee w. news                                                 c6Ama Evans newns               ratognec t.scantvan micmano ELcupauv*           pau6 p. masezum                                               tes tLL es. canv..ssa,         paa,6 us semmotorm escnamo c. poet 66 t        ,.          mostav 6.rev6e                 suses es, optevom comaso s. nesAsa ts                                           omwee J.resCMag.               novo es. sp# emet 3B
,m,,,e,,s,m,e,sN,,,,8,,,
: 4. pasesta Pskossass         mosta? w. mLeeseenase pusue r. puncE66             Tramv r, eeoners       *"*                          f       esamv 6.rstcoe                  canno es.stase6 JAests A.pteveseta             pwour n stenvet.se s' amose L.mene             mostaf M.wnstLam                                     "
sam mostat t.cmonim senato o.monotL6
Amat w FmAsta                   passtLa ogermoort 4.4m.umo eseenat6 s. ses6Lem posento a. ese6Acu6ase Jostree GA6Lo*
,g g, g,
stymALoo m ekovem       h              t Y             h.
.t g "J
m esaminA t.oesas sTtvsm m.estrono wstasaae at sumeAsso patascan es.settesty mosta? M. Lotrrkts*                                 %                  d                    a au .aeen t ut,ta p                                          ^[,g ",e,a
?
                                                                                                              ,      ,                    ggt's t
tittaa semake otame o.ostan6Amo
                                                                                                ".m     to n. won.A.
: o. misse cotson.nr svevres m.senApts mostaf woop TW6Las Jowee w. news c6Ama Evans newns ratognec t.scantvan micmano ELcupauv*
or cownst6
pau6 p. masezum t
                                                            %                        d         sown C.LopmTmA mos.Au.       taa.A.ees
tes tLL es. canv..ssa, paa,6 us semmotorm mostav 6.rev6e suses es, optevom escnamo c. poet 66 comaso s. nesAsa ts omwee J.resCMag.
                                                                                @      979 Ivan W.           Smith, Esq.                                           Mr. Lester Kornblith, Jr.
novo es. sp# emet 3B
Atomic Safety and Licensing Board                                         Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission                                       U.S. Nuclear Regulatory Commission Washington, D.C.                         20555                           Washington, D.C.                     20555 Dr. Frederick P. Cowan Apt. B-125 6152 North Verde Trail Boca Raton, Florida                   33433 Re:   Consumers Power Company (Midland Plant, Units 1 and 2)
: 4. pasesta Pskossass mosta? w. mLeeseenase esamv 6.rstcoe pusue r. puncE66 Tramv r, eeoners f
canno es.stase6 JAests A.pteveseta pwour n stenvet.se s' amose L.mene mostaf M.wnstLam Amat w FmAsta passtLa ogermoort h
h.
4.4m.umo Jostree GA6Lo*
t esaminA t.oesas wstasaae at sumeAsso eseenat6 s. ses6Lem stymALoo m ekovem Y
sTtvsm m.estrono patascan es.settesty m
posento a. ese6Acu6ase mosta? M. Lotrrkts*
^[,g ",e,a ggt's
".m to n. won.A.
d a
t p
au.aeen t ut,ta d
mos.Au.
taa.A.ees or cownst6 sown C.LopmTmA 979 Ivan W. Smith, Esq.
Mr. Lester Kornblith, Jr.
Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Washington, D.C.
20555 Dr. Frederick P. Cowan Apt. B-125 6152 North Verde Trail Boca Raton, Florida 33433 Re:
Consumers Power Company (Midland Plant, Units 1 and 2)
Docket Nos. 50-329, 50-330 Gentlemen:
Docket Nos. 50-329, 50-330 Gentlemen:
Enclosed are two interim reports submitted by Consumers Power Company to the Nuclear Regulatory Commission pursuant to 10 C.F.R. 550.55(e). The report relating to the diesel generator build-ing settlement references an enclosure, copies of which will be pro-vided         to members of the Atomic Safety and Licensing Board and any party upon request.                                                                                                              .
Enclosed are two interim reports submitted by Consumers Power Company to the Nuclear Regulatory Commission pursuant to 10 C.F.R. 550.55(e).
Ve'ry truly yours, NLv Martha E. Gibbs E                      14<
The report relating to the diesel generator build-ing settlement references an enclosure, copies of which will be pro-vided to members of the Atomic Safety and Licensing Board and any party upon request.
MEG bc cc:         Service List w/ enclosures 0
Ve'ry truly yours, NLv E 14<
[910000
Martha E. Gibbs MEG bc cc:
                                                                                                                      -          1115 274 Lar
Service List w/ enclosures
[910000 0
1115 274 Lar


            ~
~
000Sl!!ilBIS f           T                                                       .
?(Q 000Sl!!ilBIS f
        ?(Q                power                                                                                         -
T power a
a      -    C0iilpEli,f                                                         s .' - v m" " "a,,,         -
C0iilpEli,f s.' - v m" " "a,,,
M Ilhe "o
M Ilhe "o
c .a.r.: ovvie : 1e4s w P rn.i n..o,4.em n. u: cue.n 4sros . as17 7ss44ss f#
c.a.r.: ovvie : 1e4s w P rn.i n..o,4.em
August 10, 1979                                                           .-
: n. u: cue.n 4sros. as17 7ss44ss f#
l- -
\\ f'^ h g N g"[ S D August 10, 1979 l- -
Hove-218-79
Hove-218-79
                                                                                    \ f'^ h a.     g hN g"[    -
: a. h
                                                                                                                'S     SD y       opI$
'S y
b                 #
opI$
g
b g
                                                                                          ' ' cs a 1 4 Mr J G Keppler, Regional Director Office of Inspection t. Enforcenent US Nuclear Regulatory Corrission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDIJJD NUCLEAR PLANT -
' ' cs a 1 4 Mr J G Keppler, Regional Director Office of Inspection t. Enforcenent US Nuclear Regulatory Corrission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDIJJD NUCLEAR PLANT -
UNIT NO 1, Doc m No 50-329 UNIT NO 2, DOC M NO 50-330 S. N OF DIESEL Gr.seATOR IVUND/IIONS 15D EUILDII;", -
UNIT NO 1, Doc m No 50-329 UNIT NO 2, DOC M NO 50-330 S. N OF DIESEL Gr.seATOR IVUND/IIONS 15D EUILDII;", -
FILE Oh85 16 SERIAL 7395                                         ,
FILE Oh85 16 SERIAL 7395


==References:==
==References:==
: 1. S H Howell letters to J G Keppler; Midland Nuclear Plant; Unit No 1, Docket No 50-329; Unit No 2, Dochet No 50-330; Settlement of Diesel Generator Foundations and Building:
1.
: a. Serial Hove-183-78; dated Septenber 29, 1978
S H Howell letters to J G Keppler; Midland Nuclear Plant; Unit No 1, Docket No 50-329; Unit No 2, Dochet No 50-330; Settlement of Diesel Generator Foundations and Building:
: b. Serial Hove-230-78; dsted Nove=ber 7,1978
a.
: c. Serial Hove-267-78; dated December 21, 1978
Serial Hove-183-78; dated Septenber 29, 1978 b.
: d. Serial Ho.ie-? > 79; dated January 5,1979                                   .
Serial Hove-230-78; dsted Nove=ber 7,1978 c.
: e. Serial Hove-5J-79; dated Februcry 23, 1979
Serial Hove-267-78; dated December 21, 1978 d.
: f. Serial Hove-132-79; dated April 3,1979 6     Serial Howe-174-79; dated June 25, 1979
Serial Ho.ie-? > 79; dated January 5,1979 e.
: 2. G S Keeley letter to J G Kepplcr; Midland Project Docket No 50-329 and 50-330; Response to 10 CFR 50 54 - Request on Plant Fill; Serial 6925; dated April 24, 1979 3   S H Howell letters to H R Denton; Midland Project; Docket No 50-329 and 50-330; Response to 10 CFR 50 54 - Request on Plant Fill:
Serial Hove-5J-79; dated Februcry 23, 1979 f.
: a. Serial Hove-162-79; Rev 1, dated May 31,19T9 with copies to J G Keppler
Serial Hove-132-79; dated April 3,1979 6
: b. Serial Hove-199-79; Rev 2, dated July 9, 1979 with copies to J G Keppler
Serial Howe-174-79; dated June 25, 1979 2.
                                                                                                                      ,a.
G S Keeley letter to J G Kepplcr; Midland Project Docket No 50-329 and 50-330; Response to 10 CFR 50 54 - Request on Plant Fill; Serial 6925; dated April 24, 1979 3
S H Howell letters to H R Denton; Midland Project; Docket No 50-329 and 50-330; Response to 10 CFR 50 54 - Request on Plant Fill:
a.
Serial Hove-162-79; Rev 1, dated May 31,19T9 with copies to J G Keppler b.
Serial Hove-199-79; Rev 2, dated July 9, 1979 with copies to J G Keppler
.,a.
4 J
4 J
1115 275             Acce33*"
1115 275 Acce33*"
yref/ 76 3 90
yref/ 76 3 90


I.
I.
g           ..
g Hove-218 79 This letter, as were References 1.a. through g., is an Interim 50 55(e) report on the settlement of the diesel generator foundatiosas azzi building.
Hove-218 79 This letter, as were References 1.a. through g., is an Interim 50 55(e) report on the settlement of the diesel generator foundatiosas azzi building.
The enclosure documents the presentation made to members of the Staff and Inspection and Enforcement on July 18,19'[9 in Bethesda, Maryland. The presentation provided an update of the status of the act4<== previously discussed in References 1, 2 and 3; the remedial work in sarogress or r'==d; the schedule of activities; the results of the cause investigation; the QA/QC aspects; and the licensing activities and changes to -the FSAR.
The enclosure documents the presentation made to members of the Staff and Inspection and Enforcement on July 18,19'[9 in Bethesda, Maryland. The presentation provided an update of the status of the act4<== previously discussed in References 1, 2 and 3; the remedial work in sarogress or r'==d; the schedule of activities; the results of the cause investigation; the QA/QC aspects; and the licensing activities and changes to -the FSAR.
Future 50 55(e) reports vill discuss the following in acre detail:
Future 50 55(e) reports vill discuss the following in acre detail:
: s. Results of further investigation of the leaking air lirse in the tank fam area, and settle =ent criteria for the borated water storage tanks and the lines into the auziliary building.
s.
: b. Design bases to cceply with the intent of the draft Standard Reviev Plan on Devate:ing.                                                         '
Results of further investigation of the leaking air lirse in the tank fam area, and settle =ent criteria for the borated water storage tanks and the lines into the auziliary building.
: c. A Quality Assurance Plan for i=plementing the perme site devatering system.
b.
      . Another interin report vill be sent on or before September 7,' ic179
Design bases to cceply with the intent of the draft Standard Reviev Plan on Devate:ing.
_  r i                           %                              %
c.
Saa/sm/oSr
A Quality Assurance Plan for i=plementing the perme site devatering system.
Another interin report vill be sent on or before September 7,' ic179 r
i Saa/sm/oSr


==Enclosure:==
==Enclosure:==
Presentation Made at July 18,19'T9 Meeting Hit a NRC at Bethesda.
Presentation Made at July 18,19'T9 Meeting Hit a NRC at Bethesda.
CC:    Directo$ , Office of Inspectics (4 Enforcenent Att: Mr Victer Stello, USHRC (15)                         ,
Directo$, Office of Inspectics (4 CC:
Enforcenent Att: Mr Victer Stello, USHRC (15)
Director, Office of Managem-d Infomstion and Program Control, USHRC (1)
Director, Office of Managem-d Infomstion and Program Control, USHRC (1)
Director of Nuclear Reactor Regulation Att Mr Doc:enic Vassallo, Acting Director Division of Project Management, US NEC Vashington, DC 20555 P00R BRENL 1115 276
Director of Nuclear Reactor Regulation Att Mr Doc:enic Vassallo, Acting Director Division of Project Management, US NEC Vashington, DC 20555 P00R BRENL 1115 276


b t
b t
/*
/*
3                                         .
3 BCC: JLBacon, M-1085A vaBird, JSC-216B RIcsstleberry, Bechtel AA TCCooke, Midland JIcorley, Midlard LADreisbach, Bechtel-Midland DEorn, Midland CAHunt, P14-209B GSKeeley, P14 kOBB MJKoschik, M-890A EkMargt:glio, JSC-220A PAMartinez, Bechtel AA D2 Miller, Midland JFNevgen, Bechtel-Midland
BCC: JLBacon, M-1085A vaBird, JSC-216B RIcsstleberry, Bechtel AA TCCooke, Midland JIcorley, Midlard LADreisbach, Bechtel-Midland DEorn, Midland
@ ibbs, IL&B Route: eke /SE/ File: 0.4 9 20 e
* CAHunt, P14-209B GSKeeley, P14 kOBB MJKoschik, M-890A EkMargt:glio, JSC-220A PAMartinez, Bechtel AA D2 Miller, Midland JFNevgen, Bechtel-Midland
            @ ibbs, IL&B Route: eke /SE/ File: 0.4 9 20 e
0 e
0 e
e S
e S
e 1115 277
e 1115 277


                                                            '                                                                  c
i c
                                                                                              .                                        i
as
* as f45"              COnSUmBTS
''d, /&)
          ''d, /&)           power
f45" COnSUmBTS power
                                                                                " w i r e c .c. b, ""
" w i r e c.c. b, d2 C0mpany Staior Vice President General Otfices: 1945 West Parnell Road, Jackson. Michigen 49201 * (517) 7884453 August 10, 1979 g,q,,,
d2             C0mpany                                                                           Staior Vice President General Otfices: 1945 West Parnell Road, Jackson. Michigen 49201 * (517) 7884453 August 10, 1979                                                                                     g ,q,,,
Hove-220-79 n a, k
Hove-220-79                                                                                                 n a, k
gs e p
gs e p
C                           e q Mr J G I:eppler, Regional Director                                               1 ;. pt.n".' %"
pt.n".' %" 07)
                                                                                                      ,,. ,                  07)
C e q Mr J G I:eppler, Regional Director 1 ;.
Office of Inspection and Enforcement                                                                             f;,
Office of Inspection and Enforcement f;,
US Nuclear Regulatory Com=ission                                                         .-                  v'- ,
US Nuclear Regulatory Com=ission v'-,
Region III 799 Roosevelt Road                                                                                         '
Region III 799 Roosevelt Road olen Ellyn, IL 60137 MIDIAED EUCLEAR PIAM -
olen Ellyn, IL 60137 MIDIAED EUCLEAR PIAM -                                                                 .
UNIT 10 1, ROCKET to 50-329 UHIT NO 2 IOCKET HO 50-330 STATES E%INAL EIOC1'S, CFACKED DISCCHEECT LN In accordance with the require =ents of 10 CFR 50 55(e), this letter constitutes an interin report on the status of discrepant ter-inal block disecnnect isnks.
UNIT 10 1, ROCKET to 50-329 UHIT NO 2 IOCKET HO 50-330                                                             ,
STATES E%INAL EIOC1'S, CFACKED DISCCHEECT LN In accordance with the require =ents of 10 CFR 50 55(e), this letter constitutes an interin report on the status of discrepant ter-inal block disecnnect isnks.
The attach = ente to this letter provide a description of the discrepancy, safety i= plication, investigation and planned corrective acticns.
The attach = ente to this letter provide a description of the discrepancy, safety i= plication, investigation and planned corrective acticns.
Another report, either interin or final, will be sent en or before October 26, 1979                                                                                       .
Another report, either interin or final, will be sent en or before October 26, 1979
(                                                     .
(
Attach =ents:       1. Quality Assurance Program, Manage =ent Corrective Action Report, MCAR-1, Report 32, dated July 20, Igr(9
Attach =ents:
: 2. MCAR-32, Interin Report fl, dated August 6, Igrf9 CC: Director of Office of Inspection and Enforcement Att: Mr Victor Stello, USNRC (15)
1.
Director of Office of Management
Quality Assurance Program, Manage =ent Corrective Action Report, MCAR-1, Report 32, dated July 20, Igr(9 2.
-                Infor=ntion and Program Control, USERC (1)                                                         l ) 1 <3- L-) / 3
MCAR-32, Interin Report fl, dated August 6, Igrf9 CC: Director of Office of Inspection and Enforcement Att: Mr Victor Stello, USNRC (15)
                                                                                .                                        ,. L/
Infor=ntion and Program Control, USERC (1) l ) 1 <3- -) / 3 Director of Office of Management L
L/
c)Lu?
c)Lu?
ACCPG9 ton 7VC[D /G4' 2 l
ACCPG9 ton 7VC[D /G4' 2 l


  . a                                                             ,
a Hove-220-79 BCC: JLBacon, M-1085A VRBird, JSC-216B RL0astleberry, Bechtel AA LADreisbach, Bechtel-Midland
Hove-220-79 BCC: JLBacon, M-1085A VRBird , JSC-216B                                   .
-MEGibbs, IIAB GSKeeley, P14-kOBB BWMarguglio, JSC-220A PAHartinez, Bechtel AA BEH111er, Midland kE oring, Bechtel JFNewgen, Bechtel-Midland MHRice, P14 h13 HJSchaeffer, Midland File:
RL0astleberry, Bechtel AA LADreisbach, Bechtel-Midland
0.k.9 29 O
              -MEGibbs, IIAB                             -
GSKeeley, P14-kOBB                     ,        .
BWMarguglio, JSC-220A PAHartinez, Bechtel AA                                       - .
BEH111er, Midland kE oring, Bechtel JFNewgen, Bechtel-Midland MHRice, P14 h13 HJSchaeffer, Midland File:   0.k.9 29 O
e
* e a
e e
e e
9 1115 279
a e
e 9
1115 279


                                                                                                                    .r             m QUALITY ASSURANCE PRObRAM                               ,
.r m
D***79 i        .                                    MANAGEMENT CORRECTIVE ACTION REPORT i                                                                       MCAR1                       -
QUALITY ASSURANCE PRObRAM D***79 MANAGEMENT CORRECTIVE ACTION REPORT i
1 REPORT NO.
MCAR1 i
32 JOBNO.       7220                             Q NO. Various             DATE       July 20. 1979 I     ' DESCRIPTION (Including references):
1 32 REPORT NO.
JOBNO.
7220 Q NO.
Various DATE July 20. 1979 I
' DESCRIPTION (Including references):
States Terminal B3cck disconnect link failures were identified by CPCo during the elcetrical checkout of non-O-listed start-up transformer (0XO3A). Thirty-eight (38) individual dis-connect links out of 156 examined were found to be cracked..
States Terminal B3cck disconnect link failures were identified by CPCo during the elcetrical checkout of non-O-listed start-up transformer (0XO3A). Thirty-eight (38) individual dis-connect links out of 156 examined were found to be cracked..
Subsequent investigation by Bechtel on four cubicles in 4160 volt' Switchgear 2A06 revealed seven individual States Terminal Blocks with cracked disconnect links (refertv2ce NCR 2362 issued 7/20/79._ The blocks are identifled as follows:
Subsequent investigation by Bechtel on four cubicles in 4160 volt' Switchgear 2A06 revealed seven individual States Terminal Blocks with cracked disconnect links (refertv2ce NCR 2362 issued 7/20/79._ The blocks are identifled as follows:
Line 161: Line 184:
: 4. Based on the above (3) ite=s determine reportability under 10 CTP, 50.55e.
: 4. Based on the above (3) ite=s determine reportability under 10 CTP, 50.55e.
(Continued on page 2 of 2)
(Continued on page 2 of 2)
REFERRED TO             Gi ENGINEERING               O CONSTRUCTION       OQA MANAGEMENT               D O PROCUREMENT ISSUED BY D                 4              7/.2C/7Ct kofect C/w f :;AAcref        oate I
REFERRED TO Gi ENGINEERING O CONSTRUCTION OQA MANAGEMENT D
1 lA'O OSis'S(\c t+
O PROCUREMENT ISSUED BY D 7/.2C/7Ct 4
    !!      REPORTABLE DEFICIENCY NOTIF EO CLIENT         WM
1 lA'O OSis'S(\\c t+
                                                                                                                    /
kofect C/w f :;AAcref oate I
                                                                                                                            / 7'7 Dlte /
REPORTABLE DEFICIENCY NOTIF EO CLIENT WM / 7'7
O NO                                       9 YES                       ,,
/
                                                                                                /                 J                           - /
Dlte /
Project Manager                 Date           /           ,
O NO 9 YES
    !!!      CAUSE
/
                                                                                                                                                /     l f
J
CORRECTIVE ACTION TAKEN lf AUTHORIZED BY Date STANDARD D;STR:BUTION             ADDmONAL DISTR 19UTION AS APPRCPRIATE                                                                           !
- /
or.oon oa um cra                 cNc.c n cu macta                             FORMAL REPORT TO CLIENT                                           I wa,.=:ra or ca . rPo             pacate tsc .u a G*D CAu=N=Gta (If Section 11 Applies)                            Date AA0 Pnwurd MLNT $UPMita OuAuty uca                                                                             l 470 QA u ANAGEa                                                                                                         , .
Project Manager Date
CONstauCich wANALLn                                                                             ,),
/
            "" "                                                                                                                                    l
CAUSE
  $sietuS$ta                       c7rss7$'fEtt           " ' ' ' "
/
I g~4,,,,,,,,,,,,,,,,,,,           *lg,c
l f
                                    ,      ,,  ,,,cu,,,,,, ,,,                   CORRECTIVE ACTION IMPLEMENTED                                     :
CORRECTIVE ACTION TAKEN lf AUTHORIZED BY Date STANDARD D;STR:BUTION ADDmONAL DISTR 19UTION AS APPRCPRIATE or.oon oa um cra cNc.c n cu macta FORMAL REPORT TO CLIENT I
  $uNc" "$cIOU~I'"                 EsEE!Ui,$
wa,.=:ra or ca. rPo pacate tsc.u a (If Section 11 Applies)
t uo uGa or CONSTauCTaON
Date l
                                                                                                      % 7CC( C VERIFIED BY
G*D CAu=N=Gta AA0 Pnwurd MLNT $UPMita OuAuty uca 470 QA u ANAGEa CONstauCich wANALLn
                      ;    .         .,. . wn ,
,),
c,    c.                    .. -                                                Proiect OA Engineer               D4e
l
$sietuS$ta c7rss7$'fEtt I
g~4,,,,,,,,,,,,,,,,,,,
*lg,c,,,cu,,,,,,,,,
CORRECTIVE ACTION IMPLEMENTED
$uNc" "$cIOU~I'"
EsEE!Ui,$
% 7CC( C t
uo uGa or CONSTauCTaON VERIFIED BY c,
c.
.,.. wn,
Proiect OA Engineer D4e


                                                                                  ~
h
        =
~
s       h Page 2 of 2 MANAGDENT CORRECTIVE ACTION REPORT REPORT No. 32                                                                             -
=
Job No. 7220                             .
s Page 2 of 2 MANAGDENT CORRECTIVE ACTION REPORT REPORT No. 32 Job No. 7220 1*
1*   Description - continued                               .
Description - continued C'ompartment Teminal 605 u31 607 n27 610 U14,LI24 611 U7, u38, LX24 Note:
C'ompartment           Teminal                   -
605                 u31 607               n27 610                 U14,LI24 611                 U7, u38, LX24 Note:
Due to the location of the disconnect links in the block, a visual inspection of an installed block can only be r.ade on approxt::ately a quarter of the exposed surf ace of the link.
Due to the location of the disconnect links in the block, a visual inspection of an installed block can only be r.ade on approxt::ately a quarter of the exposed surf ace of the link.
* Reco= ended Action - continued
* Reco= ended Action - continued 5.
: 5. Take those corrective actiens necessary to prevent recurrence and assure the integrity of teminations associated with States Terminal Blochs.
Take those corrective actiens necessary to prevent recurrence and assure the integrity of teminations associated with States Terminal Blochs.
1115 281
1115 281
                                    .}}
.}}

Latest revision as of 22:57, 4 January 2025

Forwards CPC 790810 Interim Repts Re Settlement of Diesel Generator Foundations & Bldg & Status of Discrepant Terminal Block Disconnect Links,Respectively.Copies Will Be Provided to ASLB & Parties Upon Request
ML19209B082
Person / Time
Site: Midland
Issue date: 08/20/1979
From: Gibbs M
ISHAM, LINCOLN & BEALE
To: Cowan F, Kornblith L, Smith I
Atomic Safety and Licensing Board Panel
Shared Package
ML19209B083 List:
References
NUDOCS 7910090144
Download: ML19209B082 (1)


Text

P I

=..

s*

nurED CORRESPONDENCE g

~

ISHAM,' LINCOLN & BEALE covusaons 4r Law tow.ms

.sma.. ors...os was..m.vo. On,Cc-mosame t. umcota. isn.ises

.C. 0 ime Sr.ccr...

wt46sAes a stAtt.tses.es33 CNC FIRST N AflON AL PLAZA wAsa =oTO=.O.c.aCO3e 202= 433 9730 FORTY SCCOND PLOOR CMAmLts A.samt owio J.mosso CmCAGO,ILLINOss 40603 wether s. Antason Em w. mAsswee otAse A. asumo comato E.wacise otoNety A. Amotason wven m.eescomes.Ja.

wiLSiaes w. canzow so.e L.seecAus6Amo 3'8* 78 8

  • F500 TELER:2= Sage sean a? c. s wits
s. aeemar. J8t.

Fatotescat m. CAmson LAustmCE s. 6Asse nicwAmo e.reneusom nostot A.vo6kse ALAm m setLAusste stresse E.setasose micMamo su costwit comicwano doessesoes son,t,s s. s,u,nees,

,m,,,e,,s,m,e,sN,,,,8,,,

sam mostat t.cmonim senato o.monotL6

,g g, g,

.t g "J

?

tittaa semake otame o.ostan6Amo

o. misse cotson.nr svevres m.senApts mostaf woop TW6Las Jowee w. news c6Ama Evans newns ratognec t.scantvan micmano ELcupauv*

pau6 p. masezum t

tes tLL es. canv..ssa, paa,6 us semmotorm mostav 6.rev6e suses es, optevom escnamo c. poet 66 comaso s. nesAsa ts omwee J.resCMag.

novo es. sp# emet 3B

4. pasesta Pskossass mosta? w. mLeeseenase esamv 6.rstcoe pusue r. puncE66 Tramv r, eeoners f

canno es.stase6 JAests A.pteveseta pwour n stenvet.se s' amose L.mene mostaf M.wnstLam Amat w FmAsta passtLa ogermoort h

h.

4.4m.umo Jostree GA6Lo*

t esaminA t.oesas wstasaae at sumeAsso eseenat6 s. ses6Lem stymALoo m ekovem Y

sTtvsm m.estrono patascan es.settesty m

posento a. ese6Acu6ase mosta? M. Lotrrkts*

^[,g ",e,a ggt's

".m to n. won.A.

d a

t p

au.aeen t ut,ta d

mos.Au.

taa.A.ees or cownst6 sown C.LopmTmA 979 Ivan W. Smith, Esq.

Mr. Lester Kornblith, Jr.

Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Washington, D.C.

20555 Dr. Frederick P. Cowan Apt. B-125 6152 North Verde Trail Boca Raton, Florida 33433 Re:

Consumers Power Company (Midland Plant, Units 1 and 2)

Docket Nos. 50-329, 50-330 Gentlemen:

Enclosed are two interim reports submitted by Consumers Power Company to the Nuclear Regulatory Commission pursuant to 10 C.F.R. 550.55(e).

The report relating to the diesel generator build-ing settlement references an enclosure, copies of which will be pro-vided to members of the Atomic Safety and Licensing Board and any party upon request.

Ve'ry truly yours, NLv E 14<

Martha E. Gibbs MEG bc cc:

Service List w/ enclosures

[910000 0

1115 274 Lar

~

?(Q 000Sl!!ilBIS f

T power a

C0iilpEli,f s.' - v m" " "a,,,

M Ilhe "o

c.a.r.: ovvie : 1e4s w P rn.i n..o,4.em

n. u: cue.n 4sros. as17 7ss44ss f#

\\ f'^ h g N g"[ S D August 10, 1979 l- -

Hove-218-79

a. h

'S y

opI$

b g

' ' cs a 1 4 Mr J G Keppler, Regional Director Office of Inspection t. Enforcenent US Nuclear Regulatory Corrission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDIJJD NUCLEAR PLANT -

UNIT NO 1, Doc m No 50-329 UNIT NO 2, DOC M NO 50-330 S. N OF DIESEL Gr.seATOR IVUND/IIONS 15D EUILDII;", -

FILE Oh85 16 SERIAL 7395

References:

1.

S H Howell letters to J G Keppler; Midland Nuclear Plant; Unit No 1, Docket No 50-329; Unit No 2, Dochet No 50-330; Settlement of Diesel Generator Foundations and Building:

a.

Serial Hove-183-78; dated Septenber 29, 1978 b.

Serial Hove-230-78; dsted Nove=ber 7,1978 c.

Serial Hove-267-78; dated December 21, 1978 d.

Serial Ho.ie-? > 79; dated January 5,1979 e.

Serial Hove-5J-79; dated Februcry 23, 1979 f.

Serial Hove-132-79; dated April 3,1979 6

Serial Howe-174-79; dated June 25, 1979 2.

G S Keeley letter to J G Kepplcr; Midland Project Docket No 50-329 and 50-330; Response to 10 CFR 50 54 - Request on Plant Fill; Serial 6925; dated April 24, 1979 3

S H Howell letters to H R Denton; Midland Project; Docket No 50-329 and 50-330; Response to 10 CFR 50 54 - Request on Plant Fill:

a.

Serial Hove-162-79; Rev 1, dated May 31,19T9 with copies to J G Keppler b.

Serial Hove-199-79; Rev 2, dated July 9, 1979 with copies to J G Keppler

.,a.

4 J

1115 275 Acce33*"

yref/ 76 3 90

I.

g Hove-218 79 This letter, as were References 1.a. through g., is an Interim 50 55(e) report on the settlement of the diesel generator foundatiosas azzi building.

The enclosure documents the presentation made to members of the Staff and Inspection and Enforcement on July 18,19'[9 in Bethesda, Maryland. The presentation provided an update of the status of the act4<== previously discussed in References 1, 2 and 3; the remedial work in sarogress or r'==d; the schedule of activities; the results of the cause investigation; the QA/QC aspects; and the licensing activities and changes to -the FSAR.

Future 50 55(e) reports vill discuss the following in acre detail:

s.

Results of further investigation of the leaking air lirse in the tank fam area, and settle =ent criteria for the borated water storage tanks and the lines into the auziliary building.

b.

Design bases to cceply with the intent of the draft Standard Reviev Plan on Devate:ing.

c.

A Quality Assurance Plan for i=plementing the perme site devatering system.

Another interin report vill be sent on or before September 7,' ic179 r

i Saa/sm/oSr

Enclosure:

Presentation Made at July 18,19'T9 Meeting Hit a NRC at Bethesda.

Directo$, Office of Inspectics (4 CC:

Enforcenent Att: Mr Victer Stello, USHRC (15)

Director, Office of Managem-d Infomstion and Program Control, USHRC (1)

Director of Nuclear Reactor Regulation Att Mr Doc:enic Vassallo, Acting Director Division of Project Management, US NEC Vashington, DC 20555 P00R BRENL 1115 276

b t

/*

3 BCC: JLBacon, M-1085A vaBird, JSC-216B RIcsstleberry, Bechtel AA TCCooke, Midland JIcorley, Midlard LADreisbach, Bechtel-Midland DEorn, Midland CAHunt, P14-209B GSKeeley, P14 kOBB MJKoschik, M-890A EkMargt:glio, JSC-220A PAMartinez, Bechtel AA D2 Miller, Midland JFNevgen, Bechtel-Midland

@ ibbs, IL&B Route: eke /SE/ File: 0.4 9 20 e

0 e

e S

e 1115 277

i c

as

d, /&)

f45" COnSUmBTS power

" w i r e c.c. b, d2 C0mpany Staior Vice President General Otfices: 1945 West Parnell Road, Jackson. Michigen 49201 * (517) 7884453 August 10, 1979 g,q,,,

Hove-220-79 n a, k

gs e p

pt.n".' %" 07)

C e q Mr J G I:eppler, Regional Director 1 ;.

Office of Inspection and Enforcement f;,

US Nuclear Regulatory Com=ission v'-,

Region III 799 Roosevelt Road olen Ellyn, IL 60137 MIDIAED EUCLEAR PIAM -

UNIT 10 1, ROCKET to 50-329 UHIT NO 2 IOCKET HO 50-330 STATES E%INAL EIOC1'S, CFACKED DISCCHEECT LN In accordance with the require =ents of 10 CFR 50 55(e), this letter constitutes an interin report on the status of discrepant ter-inal block disecnnect isnks.

The attach = ente to this letter provide a description of the discrepancy, safety i= plication, investigation and planned corrective acticns.

Another report, either interin or final, will be sent en or before October 26, 1979

(

Attach =ents:

1.

Quality Assurance Program, Manage =ent Corrective Action Report, MCAR-1, Report 32, dated July 20, Igr(9 2.

MCAR-32, Interin Report fl, dated August 6, Igrf9 CC: Director of Office of Inspection and Enforcement Att: Mr Victor Stello, USNRC (15)

Infor=ntion and Program Control, USERC (1) l ) 1 <3- -) / 3 Director of Office of Management L

L/

c)Lu?

ACCPG9 ton 7VC[D /G4' 2 l

a Hove-220-79 BCC: JLBacon, M-1085A VRBird, JSC-216B RL0astleberry, Bechtel AA LADreisbach, Bechtel-Midland

-MEGibbs, IIAB GSKeeley, P14-kOBB BWMarguglio, JSC-220A PAHartinez, Bechtel AA BEH111er, Midland kE oring, Bechtel JFNewgen, Bechtel-Midland MHRice, P14 h13 HJSchaeffer, Midland File:

0.k.9 29 O

e e

a e

e 9

1115 279

.r m

QUALITY ASSURANCE PRObRAM D***79 MANAGEMENT CORRECTIVE ACTION REPORT i

MCAR1 i

1 32 REPORT NO.

JOBNO.

7220 Q NO.

Various DATE July 20. 1979 I

' DESCRIPTION (Including references):

States Terminal B3cck disconnect link failures were identified by CPCo during the elcetrical checkout of non-O-listed start-up transformer (0XO3A). Thirty-eight (38) individual dis-connect links out of 156 examined were found to be cracked..

Subsequent investigation by Bechtel on four cubicles in 4160 volt' Switchgear 2A06 revealed seven individual States Terminal Blocks with cracked disconnect links (refertv2ce NCR 2362 issued 7/20/79._ The blocks are identifled as follows:

(Continued on page 2 of 2)

  • RECOMMENDED ACTION (Optional)
1. Determine what effects cracked links in States Ter=inal Blocks could have on plant safety if uncorrected.
2. Determine cause for the cracked disconnect links.
3. Determine magnitude of problem.
4. Based on the above (3) ite=s determine reportability under 10 CTP, 50.55e.

(Continued on page 2 of 2)

REFERRED TO Gi ENGINEERING O CONSTRUCTION OQA MANAGEMENT D

O PROCUREMENT ISSUED BY D 7/.2C/7Ct 4

1 lA'O OSis'S(\\c t+

kofect C/w f :;AAcref oate I

REPORTABLE DEFICIENCY NOTIF EO CLIENT WM / 7'7

/

Dlte /

O NO 9 YES

/

J

- /

Project Manager Date

/

CAUSE

/

l f

CORRECTIVE ACTION TAKEN lf AUTHORIZED BY Date STANDARD D;STR:BUTION ADDmONAL DISTR 19UTION AS APPRCPRIATE or.oon oa um cra cNc.c n cu macta FORMAL REPORT TO CLIENT I

wa,.=:ra or ca. rPo pacate tsc.u a (If Section 11 Applies)

Date l

G*D CAu=N=Gta AA0 Pnwurd MLNT $UPMita OuAuty uca 470 QA u ANAGEa CONstauCich wANALLn

,),

l

$sietuS$ta c7rss7$'fEtt I

g~4,,,,,,,,,,,,,,,,,,,

  • lg,c,,,cu,,,,,,,,,

CORRECTIVE ACTION IMPLEMENTED

$uNc" "$cIOU~I'"

EsEE!Ui,$

% 7CC( C t

uo uGa or CONSTauCTaON VERIFIED BY c,

c.

.,.. wn,

Proiect OA Engineer D4e

h

~

=

s Page 2 of 2 MANAGDENT CORRECTIVE ACTION REPORT REPORT No. 32 Job No. 7220 1*

Description - continued C'ompartment Teminal 605 u31 607 n27 610 U14,LI24 611 U7, u38, LX24 Note:

Due to the location of the disconnect links in the block, a visual inspection of an installed block can only be r.ade on approxt::ately a quarter of the exposed surf ace of the link.

  • Reco= ended Action - continued 5.

Take those corrective actiens necessary to prevent recurrence and assure the integrity of teminations associated with States Terminal Blochs.

1115 281

.