{{#Wiki_filter:July 13, 2023
{{#Wiki_filter:Terry Brown
Terry Brown
Site Vice President
Site Vice President
Energy Harbor Nuclear Corp.
Energy Harbor Nuclear Corp.
Line 24: Line 23:
5501 N. State Rte. 2, Mail Stop A-DB-3080
5501 N. State Rte. 2, Mail Stop A-DB-3080
Oak Harbor, OH 43449-9760
Oak Harbor, OH 43449-9760
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - INFORMATION REQUEST FOR
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - INFORMATION REQUEST FOR  
              THE CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO
THE CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO  
              PERFORM INSPECTION 05000346/2023402
PERFORM INSPECTION 05000346/2023402  
Dear Terry Brown:
Dear Terry Brown:  
On November 6, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
On November 6, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline  
inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0
inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0  
at your Davis-Besse Nuclear Power Station. The inspection will be performed to evaluate and
at your Davis-Besse Nuclear Power Station. The inspection will be performed to evaluate and  
verify your ability to meet the NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations
verify your ability to meet the NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations  
(CFR), Part 73, Section 54, Protection of Digital Computer and Communication Systems and
(CFR), Part 73, Section 54, Protection of Digital Computer and Communication Systems and  
Networks. The onsite portion of the inspection will take place November 6-10, 2023.
Networks. The onsite portion of the inspection will take place November 6-10, 2023.
Experience has shown that baseline inspections are extremely resource intensive, both for the
Experience has shown that baseline inspections are extremely resource intensive, both for the  
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site  
and to ensure a productive inspection for both parties, we have enclosed a request for
and to ensure a productive inspection for both parties, we have enclosed a request for  
documents needed for the inspection. These documents have been divided into four groups.
documents needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the
The first group specifies information necessary to assist the inspection team in choosing the  
focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should
focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should  
be made available electronically no later than September 12, 2023. The inspection team will
be made available electronically no later than September 12, 2023. The inspection team will  
review this information and, by September 25, 2023, will request the specific items that should
review this information and, by September 25, 2023, will request the specific items that should  
be provided for review.
be provided for review.
The second group of additional requested documents will assist the inspection team in the
The second group of additional requested documents will assist the inspection team in the  
evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,
evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,  
and the areas of the licensees Cyber Security Plan (CSP) selected for the cyber-security
and the areas of the licensees Cyber Security Plan (CSP) selected for the cyber-security  
inspection. This information will be requested for review in the regional office prior to the
inspection. This information will be requested for review in the regional office prior to the  
inspection by October 25, 2023, as identified above.
inspection by October 25, 2023, as identified above.
The third group of requested documents consists of those items that the inspection team will
The third group of requested documents consists of those items that the inspection team will  
review, or need access to, during the inspection. Please have this information available by the
review, or need access to, during the inspection. Please have this information available by the  
first day of the onsite inspection, November 6, 2023.
first day of the onsite inspection, November 6, 2023.
July 13, 2023


T. Brown                                           -2-
T. Brown
The fourth group of information is necessary to aid the inspection team in tracking issues
- 2 -
identified as a result of the inspection. It is requested that this information be provided to the
The fourth group of information is necessary to aid the inspection team in tracking issues  
lead inspector as the information is generated during the inspection. It is important that all of
identified as a result of the inspection. It is requested that this information be provided to the  
these documents are up to date and complete in order to minimize the number of additional
lead inspector as the information is generated during the inspection. It is important that all of  
these documents are up to date and complete in order to minimize the number of additional  
documents requested during the preparation and/or the onsite portions of the inspection.
documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Jasmine Gilliam. We understand that our regulatory
The lead inspector for this inspection is Jasmine Gilliam. We understand that our regulatory  
contact for this inspection is Gerald Wolf of your organization. If there are any questions about
contact for this inspection is Gerald Wolf of your organization. If there are any questions about  
the inspection or the material requested, please contact the lead inspector at 630-829-9831 or
the inspection or the material requested, please contact the lead inspector at 630-829-9831 or  
via e-mail at Jasmine.Gilliam@nrc.gov.
via e-mail at Jasmine.Gilliam@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, Control
requirements were approved by the Office of Management and Budget, Control  
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
respond to, a request for information or an information collection requirement unless the
respond to, a request for information or an information collection requirement unless the  
requesting document displays a currently valid Office of Management and Budget control
requesting document displays a currently valid Office of Management and Budget control  
number.
number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,  
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available  
electronically for public inspection in the NRCs Public Document Room or from the Publicly
electronically for public inspection in the NRCs Public Document Room or from the Publicly  
Available Records (PARS) component of the NRC's Agencywide Documents Access and
Available Records (PARS) component of the NRC's Agencywide Documents Access and  
Management System (ADAMS). ADAMS is accessible from the NRC Web site at
Management System (ADAMS). ADAMS is accessible from the NRC Web site at  
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                  Sincerely,
Sincerely,
                                                                        Signed by Gilliam, Jasmine
Jasmine Gilliam, Senior Reactor Inspector
                                                                          on 07/13/23
Engineering Branch 2
                                                  Jasmine Gilliam, Senior Reactor Inspector
Division of Operating Reactor Safety
                                                  Engineering Branch 2
                                                  Division of Operating Reactor Safety
Docket No. 50-346
Docket No. 50-346
License No. NPF-3
License No. NPF-3
Line 87: Line 86:
   Document Request
   Document Request
cc w/encl: Distribution via LISTSERV
cc w/encl: Distribution via LISTSERV
Signed by Gilliam, Jasmine
on 07/13/23


T. Brown                                       -3-
T. Brown
- 3 -
Letter to T. Brown from J. Gilliam dated July 13, 2023.
Letter to T. Brown from J. Gilliam dated July 13, 2023.
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - INFORMATION REQUEST FOR
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - INFORMATION REQUEST FOR  
            THE CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO
THE CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO  
            PERFORM INSPECTION 05000346/2023402
PERFORM INSPECTION 05000346/2023402
DISTRIBUTION:
DISTRIBUTION:
Jeffrey Josey
Jeffrey Josey
Line 104: Line 106:
R3-DORS
R3-DORS
ADAMS Accession Number: ML23193A784
ADAMS Accession Number: ML23193A784
    Publicly Available       Non-Publicly Available   Sensitive Non-Sensitive
Publicly Available
OFFICE       RIII
Non-Publicly Available
NAME         JGilliam:do
Sensitive
DATE         07/13/2023
Non-Sensitive
                                  OFFICIAL RECORD COPY
OFFICE
RIII
NAME
JGilliam:do
DATE
07/13/2023
OFFICIAL RECORD COPY


Inspection Report:             05000346/2023402
Enclosure
Inspection Dates:             November 6-10, 2023
Inspection Report:
Inspection Procedure:         IP 71130.10, Cyber-Security, Revision 0
05000346/2023402
NRC Inspectors:               Jasmine Gilliam, Lead                   Kevin Fay
Inspection Dates:
                              630-829-9831                             630-829-9866
November 6-10, 2023
                              Jasmine.Gilliam@nrc.gov                 Kevin.Fay@nrc.gov
Inspection Procedure:
NRC Contractors:               Tim Marshall                             Michael Shock
IP 71130.10, Cyber-Security, Revision 0
                              Timothy.Marshall@nrc.gov               Michael.Shock@nrc.gov
NRC Inspectors:
I.   Information Requested for In-Office Preparation
Jasmine Gilliam, Lead
      The initial request for information (i.e., first RFI) concentrates on providing the inspection
Kevin Fay
      team with the general information necessary to select appropriate components and
630-829-9831
      Cyber Security Plan (CSP) elements to develop a site-specific inspection plan. The first
630-829-9866
      RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs)
Jasmine.Gilliam@nrc.gov
      plus operational and management (O&M) security control portions of the CSP to be
Kevin.Fay@nrc.gov
      chosen as the sample set required to be inspected by the cyber-security IP. The first
NRC Contractors:
      RFIs requested information is specified below in Table RFI #1. The Table RFI #1
Tim Marshall  
      information is requested to be provided to the regional office by September 12, 2023, or
Michael Shock
      sooner, to facilitate the selection of the specific items that will be reviewed during the
Timothy.Marshall@nrc.gov  
      onsite inspection weeks.
          Michael.Shock@nrc.gov
      The inspection team will examine the returned documentation from the first RFI and
I.
      identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more
Information Requested for In-Office Preparation
      focused follow-up request to develop the second RFI. The inspection team will submit
The initial request for information (i.e., first RFI) concentrates on providing the inspection  
      the specific systems and equipment list to your staff by September 25, 2023, which will
team with the general information necessary to select appropriate components and  
      identify the specific systems and equipment that will be utilized to evaluate the
Cyber Security Plan (CSP) elements to develop a site-specific inspection plan. The first  
      CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the
RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs)  
      cyber-security inspection. We request that the additional information provided from the
plus operational and management (O&M) security control portions of the CSP to be  
      second RFI be made available to the regional office prior to the inspection by
chosen as the sample set required to be inspected by the cyber-security IP. The first  
      October 25, 2023.
RFIs requested information is specified below in Table RFI #1. The Table RFI #1  
      The required Table RFI 1 information shall be provided electronically to the lead
information is requested to be provided to the regional office by September 12, 2023, or  
      inspector by September 12, 2023. If a compact disk (CD) is provided, please provide
sooner, to facilitate the selection of the specific items that will be reviewed during the  
      four copies (one for each inspector/contactor). The preferred file format for all lists is a
onsite inspection weeks.
      searchable Excel spreadsheet file. These files should be indexed and hyper-linked to
The inspection team will examine the returned documentation from the first RFI and  
      facilitate ease of use. If you have any questions regarding this information, please call
identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more  
      the inspection team leader as soon as possible.
focused follow-up request to develop the second RFI. The inspection team will submit  
                                                                                            Enclosure
the specific systems and equipment list to your staff by September 25, 2023, which will  
identify the specific systems and equipment that will be utilized to evaluate the  
CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the  
cyber-security inspection. We request that the additional information provided from the  
second RFI be made available to the regional office prior to the inspection by  
October 25, 2023.
The required Table RFI 1 information shall be provided electronically to the lead  
inspector by September 12, 2023. If a compact disk (CD) is provided, please provide  
four copies (one for each inspector/contactor). The preferred file format for all lists is a  
searchable Excel spreadsheet file. These files should be indexed and hyper-linked to  
facilitate ease of use. If you have any questions regarding this information, please call  
the inspection team leader as soon as possible.


                                      Table RFI #1
2
Request:                                                                   IP Ref
Table RFI #1
    A list of all Identified CSs/CDAs-highlight/note any additions,
Request:
    deletions, reclassifications due to new guidance from white papers,
IP Ref
1                                                                        Overall
1
    changes to NEI 10-04, 13-10, etc., since the last cyber-security
A list of all Identified CSs/CDAs-highlight/note any additions,  
    inspection
deletions, reclassifications due to new guidance from white papers,  
    A list of Emergency Preparedness and Security onsite and offsite
changes to NEI 10-04, 13-10, etc., since the last cyber-security  
2                                                                        Overall
inspection
    digital communication systems
Overall
    Network Topology Diagrams to include information and data flow for
2
3                                                                        Overall
A list of Emergency Preparedness and Security onsite and offsite  
    critical systems in levels 2, 3 and 4 (If available)
digital communication systems
4 Ongoing Monitoring and Assessment program documentation               03.01(a)
Overall
    The most recent effectiveness analysis of the Cyber-Security
3
5                                                                        03.01(b)
Network Topology Diagrams to include information and data flow for  
    Program
critical systems in levels 2, 3 and 4 (If available)
Vulnerability screening/assessment and scan program documentation     03.01(c)
Overall
    Cyber-Security Incident response documentation, including incident
4
    detection, response, and recovery documentation as well as           03.02(a)
Ongoing Monitoring and Assessment program documentation
7 contingency plan development, implementation and including any           and
03.01(a)
    program documentation that requires testing of security boundary     03.04(b)
5
    device functionality
The most recent effectiveness analysis of the Cyber-Security  
8 Device Access and Key Control documentation                           03.02(c)
Program
9 Password/Authenticator documentation                                 03.02(c)
03.01(b)
10 User Account/Credential documentation                                 03.02(d)
6
    Portable Media and Mobile Device control documentation, including
Vulnerability screening/assessment and scan program documentation
11                                                                        03.02(e)
03.01(c)
    kiosk security control assessment/documentation
7
    Design change/modification program documentation and a list of all
Cyber-Security Incident response documentation, including incident  
    design changes that affected CDAs that have been installed and
detection, response, and recovery documentation as well as  
12 completed since the last cyber-security inspection, including either a 03.03(a)
contingency plan development, implementation and including any  
    summary of the design change or the 50.59 documentation of the
program documentation that requires testing of security boundary  
    change
device functionality
                                                                          03.03(a)
03.02(a)
    Supply Chain Management documentation including any security
and
13                                                                        , (b) and
03.04(b)
    impact analysis for new acquisitions
8
                                                                              (c)
Device Access and Key Control documentation
    Configuration Management documentation including any security
03.02(c)
                                                                          03.03(a)
9
14 impact analysis performed due to configuration changes since the last
Password/Authenticator documentation
                                                                          and (b)
03.02(c)
    inspection
10
                                        2
User Account/Credential documentation
03.02(d)
11
Portable Media and Mobile Device control documentation, including  
kiosk security control assessment/documentation
03.02(e)
12
Design change/modification program documentation and a list of all  
design changes that affected CDAs that have been installed and  
completed since the last cyber-security inspection, including either a  
summary of the design change or the 50.59 documentation of the  
change
03.03(a)
13
Supply Chain Management documentation including any security  
impact analysis for new acquisitions
03.03(a)
, (b) and  
(c)
14
Configuration Management documentation including any security  
impact analysis performed due to configuration changes since the last  
inspection
03.03(a)
and (b)


                                            Table RFI #1
3
    Request:                                                                           IP Ref
Table RFI #1
            Cyber-Security Plan and any 50.54(p) analysis to support changes to
Request:
      15                                                                                03.04(a)
IP Ref
          the plan since the last inspection
15
                                                                                          03.06
Cyber-Security Plan and any 50.54(p) analysis to support changes to  
      16   Cyber-Security Metrics tracked (if applicable)
the plan since the last inspection
                                                                                          (b)
03.04(a)
            Provide documentation describing any cyber-security changes to the
16
      17                                                                                Overall
Cyber-Security Metrics tracked (if applicable)
          access authorization program since the last cyber-security inspection
03.06
            Provide a list of all procedures and policies provided to the NRC with
(b)
      18                                                                                Overall
17
          their descriptive name and associated number (if available)
Provide documentation describing any cyber-security changes to the  
                                                                                          03.06
access authorization program since the last cyber-security inspection
      19   Performance testing report (if applicable)
Overall
                                                                                          (a)
18
    In addition to the above information please provide the following:
Provide a list of all procedures and policies provided to the NRC with  
    (1)     Electronic copy of the Updated Final Safety Analysis Report (UFSAR) and
their descriptive name and associated number (if available)
            technical specifications.
Overall
    (2)     Name(s) and phone numbers for the regulatory and technical contacts.
19
    (3)     Current management and engineering organizational charts.
Performance testing report (if applicable)
    Based on this information, the inspection team will identify and select specific systems
03.06
    and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and
(a)
    submit a list of specific systems and equipment to your staff by August 02, 2023, for the
In addition to the above information please provide the following:
    second RFI (i.e., RFI #2).
(1)
II. Additional Information Requested to be Available Prior to Inspection
Electronic copy of the Updated Final Safety Analysis Report (UFSAR) and  
    As stated in Section I above, the inspection team will examine the returned
technical specifications.
    documentation requested from Table RFI #1 and submit the list of specific systems
(2)
    and equipment to your staff by September 25, 2023, for the second RFI (i.e., RFI #2).
Name(s) and phone numbers for the regulatory and technical contacts.
    The second RFI will request additional information required to evaluate the CSs/CDAs,
(3)
    defensive architecture, and the areas of the licensees CSP selected for the cyber-
Current management and engineering organizational charts.
    security inspection. The additional information requested for the specific systems and
Based on this information, the inspection team will identify and select specific systems  
    equipment is identified in Table RFI #2.
and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and  
    The Table RFI #2 information shall be provided electronically to the lead inspector by
submit a list of specific systems and equipment to your staff by August 02, 2023, for the  
    October 25, 2023. If a CD is provided, please provide four copies (one for each
second RFI (i.e., RFI #2).
    inspector/contactor). The preferred file format for all lists is a searchable Excel
II.
    spreadsheet file. These files should be indexed and hyper-linked to facilitate ease of
Additional Information Requested to be Available Prior to Inspection
    use. If you have any questions regarding this information, please call the inspection
As stated in Section I above, the inspection team will examine the returned  
    team leader as soon as possible.
documentation requested from Table RFI #1 and submit the list of specific systems  
                                              3
and equipment to your staff by September 25, 2023, for the second RFI (i.e., RFI #2).  
The second RFI will request additional information required to evaluate the CSs/CDAs,  
defensive architecture, and the areas of the licensees CSP selected for the cyber-
security inspection. The additional information requested for the specific systems and  
equipment is identified in Table RFI #2.
The Table RFI #2 information shall be provided electronically to the lead inspector by  
October 25, 2023. If a CD is provided, please provide four copies (one for each  
inspector/contactor). The preferred file format for all lists is a searchable Excel  
spreadsheet file. These files should be indexed and hyper-linked to facilitate ease of  
use. If you have any questions regarding this information, please call the inspection  
team leader as soon as possible.  


                                      Table RFI #2
4
Table RFI #2
Request
Request
                                                                            Items
Items
    For the system(s) chosen for inspection provide:
For the system(s) chosen for inspection provide:
    Ongoing Monitoring and Assessment activity performed on the
1
1                                                                          03.01(a)
Ongoing Monitoring and Assessment activity performed on the  
    system(s)
system(s)
2 All Security Control Assessments for the selected system(s)             03.01(a)
03.01(a)
    All vulnerability screenings/assessments associated with or scans
2
3 performed on the selected system(s) since the last cyber-security       03.01(c)
All Security Control Assessments for the selected system(s)
    inspection
03.01(a)
    Documentation (including configuration files and rules sets) for
3
    Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),
All vulnerability screenings/assessments associated with or scans  
4 Host-based Intrusion Detection Systems (HIDS), and Security             03.02(b)
performed on the selected system(s) since the last cyber-security  
    Information and Event Management (SIEM) systems for system(s)
inspection
    chosen for inspection)
03.01(c)
    Documentation (including configuration files and rule sets) for
4
5 intra-security level firewalls and boundary devices used to protect     03.02(c)
Documentation (including configuration files and rules sets) for  
    the selected system(s)
Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),  
    Copies of all periodic reviews of the access authorization list for the
Host-based Intrusion Detection Systems (HIDS), and Security  
6 selected systems since the last inspection                               03.02(d)
Information and Event Management (SIEM) systems for system(s)  
7 Baseline configuration data sheets for the selected CDAs                 03.03(a)
chosen for inspection)
    Documentation on any changes, including Security Impact Analyses,
03.02(b)
8 performed on the selected system(s) since the last inspection           03.03(b)
5
    Copies of the purchase order documentation for any new equipment
Documentation (including configuration files and rule sets) for  
9 purchased for the selected systems since the last inspection             03.03(c)
intra-security level firewalls and boundary devices used to protect  
    Copies of any cyber-security drills performed since the last           03.02(a)
the selected system(s)
10 inspection, along with any reports or assessments generated             03.04(b)
03.02(c)
    Copy of the individual recovery plan(s) for the selected system(s)
6
                                                                            03.02(a)
Copies of all periodic reviews of the access authorization list for the  
11 including documentation of the results the last time the backups         03.04(b)
selected systems since the last inspection
    were executed
03.02(d)
    Corrective actions taken as a result of cyber-security
7
12 incidents/issues to include previous NRC violations and Licensee         03.04(d)
Baseline configuration data sheets for the selected CDAs
    Identified Violations since the last cyber-security inspection
03.03(a)
                                        4
8
Documentation on any changes, including Security Impact Analyses,  
performed on the selected system(s) since the last inspection
03.03(b)
9
Copies of the purchase order documentation for any new equipment  
purchased for the selected systems since the last inspection
03.03(c)
10
Copies of any cyber-security drills performed since the last  
inspection, along with any reports or assessments generated
03.02(a)
03.04(b)
11
Copy of the individual recovery plan(s) for the selected system(s)  
including documentation of the results the last time the backups  
were executed
03.02(a)
03.04(b)
12
Corrective actions taken as a result of cyber-security  
incidents/issues to include previous NRC violations and Licensee  
Identified Violations since the last cyber-security inspection
03.04(d)


III. Information Requested to be Available on First Day of Inspection
5
    For the specific systems and equipment identified in Section II above, provide the
III.
    following RFI (i.e., Table 1ST Week Onsite) electronically by November 6, 2023, the first
Information Requested to be Available on First Day of Inspection
    day of the inspection.
For the specific systems and equipment identified in Section II above, provide the  
                                        Table 1ST Week Onsite
following RFI (i.e., Table 1ST Week Onsite) electronically by November 6, 2023, the first  
      Request:                                                                       Items
day of the inspection.
            Any cyber-security event reports submitted in accordance with
Table 1ST Week Onsite
        1                                                                          03.04(a)
Request:
            10 CFR 73.77 since the last cyber-security inspection
Items
            Updated Copies of corrective actions taken as a result of
1
            cyber-security incidents/issues, to include previous NRC violations
Any cyber-security event reports submitted in accordance with  
        2                                                                          03.04(d)
10 CFR 73.77 since the last cyber-security inspection
            and Licensee Identified Violations since the last cyber-security
03.04(a)
            inspection, as well as vulnerability-related corrective actions
2
    In addition to the above information please provide the following:
Updated Copies of corrective actions taken as a result of  
    (1)     Copies of the following documents do not need to be solely available to the
cyber-security incidents/issues, to include previous NRC violations  
            inspection team as long as the inspectors have easy and unrestrained access to
and Licensee Identified Violations since the last cyber-security  
            them.
inspection, as well as vulnerability-related corrective actions
            a. UFSAR, if not previously provided;
03.04(d)
            b. Original Final Safety Analysis Report (FSAR) Volumes;
In addition to the above information please provide the following:
            c. Original Safety Evaluation Report (SER) and Supplements;
(1)
            d. FSAR Question and Answers;
Copies of the following documents do not need to be solely available to the  
            e. Quality Assurance (QA) Plan;
inspection team as long as the inspectors have easy and unrestrained access to  
            f. Technical Specifications, if not previously provided; and
them.
            g. Latest Individual Plant Examination and Probabilistic Risk Assessment
a.
                (IPE/PRA) Report.
UFSAR, if not previously provided;
    (2)     Vendor Manuals, Assessment and Corrective Actions:
b.
            a. The most recent Cyber-Security QA audit and/or self-assessment; and
Original Final Safety Analysis Report (FSAR) Volumes;
            b. Corrective action documents (e.g., condition reports, including status of
c.
                corrective actions) generate as a result of the most recent Cyber-Security QA
Original Safety Evaluation Report (SER) and Supplements;
                audit and/or self-assessment.
d.
                                                5
FSAR Question and Answers;
e.
Quality Assurance (QA) Plan;
f.
Technical Specifications, if not previously provided; and
g.
Latest Individual Plant Examination and Probabilistic Risk Assessment  
(IPE/PRA) Report.
(2)
Vendor Manuals, Assessment and Corrective Actions:
a.
The most recent Cyber-Security QA audit and/or self-assessment; and
b.
Corrective action documents (e.g., condition reports, including status of  
corrective actions) generate as a result of the most recent Cyber-Security QA  
audit and/or self-assessment.


IV.     Information Requested to be Provided Throughout the Inspection
6
            (1) Copies of any corrective action documents generated as a result of the
IV.
                inspection teams questions or queries during the inspection.
Information Requested to be Provided Throughout the Inspection
            (2) Copies of the list of questions submitted by the inspection team members and
(1) Copies of any corrective action documents generated as a result of the  
                the status/resolution of the information requested (provided daily during the
inspection teams questions or queries during the inspection.
                inspection to each inspection team member).
(2) Copies of the list of questions submitted by the inspection team members and  
If you have any questions regarding the information requested, please contact the inspection
the status/resolution of the information requested (provided daily during the  
inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection  
team leader.
team leader.
                                                  6
}}
}}

Latest revision as of 17:42, 2 January 2025

Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402
ML23193A784
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/13/2023
From: Jasmine Gilliam
NRC/RGN-III
To: Tony Brown
Energy Harbor Nuclear Corp
References
IR 2023402
Download: ML23193A784 (1)


See also: IR 05000346/2023402

Text

Terry Brown

Site Vice President

Energy Harbor Nuclear Corp.

Davis-Besse Nuclear Power Station

5501 N. State Rte. 2, Mail Stop A-DB-3080

Oak Harbor, OH 43449-9760

SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - INFORMATION REQUEST FOR

THE CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO

PERFORM INSPECTION 05000346/2023402

Dear Terry Brown:

On November 6, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0

at your Davis-Besse Nuclear Power Station. The inspection will be performed to evaluate and

verify your ability to meet the NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations

(CFR), Part 73, Section 54, Protection of Digital Computer and Communication Systems and

Networks. The onsite portion of the inspection will take place November 6-10, 2023.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should

be made available electronically no later than September 12, 2023. The inspection team will

review this information and, by September 25, 2023, will request the specific items that should

be provided for review.

The second group of additional requested documents will assist the inspection team in the

evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,

and the areas of the licensees Cyber Security Plan (CSP) selected for the cyber-security

inspection. This information will be requested for review in the regional office prior to the

inspection by October 25, 2023, as identified above.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, November 6, 2023.

July 13, 2023

T. Brown

- 2 -

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Jasmine Gilliam. We understand that our regulatory

contact for this inspection is Gerald Wolf of your organization. If there are any questions about

the inspection or the material requested, please contact the lead inspector at 630-829-9831 or

via e-mail at Jasmine.Gilliam@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Jasmine Gilliam, Senior Reactor Inspector

Engineering Branch 2

Division of Operating Reactor Safety

Docket No. 50-346

License No. NPF-3

Enclosure:

Cyber-Security Inspection

Document Request

cc w/encl: Distribution via LISTSERV

Signed by Gilliam, Jasmine

on 07/13/23

T. Brown

- 3 -

Letter to T. Brown from J. Gilliam dated July 13, 2023.

SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - INFORMATION REQUEST FOR

THE CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO

PERFORM INSPECTION 05000346/2023402

DISTRIBUTION:

Jeffrey Josey

RidsNrrDorlLpl3

RidsNrrPMDavisBesse Resource

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

Allan Barker

R3-DORS

ADAMS Accession Number: ML23193A784

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

JGilliam:do

DATE

07/13/2023

OFFICIAL RECORD COPY

Enclosure

Inspection Report: 05000346/2023402

Inspection Dates:

November 6-10, 2023

Inspection Procedure:

IP 71130.10, Cyber-Security, Revision 0

NRC Inspectors:

Jasmine Gilliam, Lead

Kevin Fay

630-829-9831

630-829-9866

Jasmine.Gilliam@nrc.gov

Kevin.Fay@nrc.gov

NRC Contractors:

Tim Marshall

Michael Shock

Timothy.Marshall@nrc.gov

Michael.Shock@nrc.gov

I.

Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection

team with the general information necessary to select appropriate components and

Cyber Security Plan (CSP) elements to develop a site-specific inspection plan. The first

RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs)

plus operational and management (O&M) security control portions of the CSP to be

chosen as the sample set required to be inspected by the cyber-security IP. The first

RFIs requested information is specified below in Table RFI #1. The Table RFI #1

information is requested to be provided to the regional office by September 12, 2023, or

sooner, to facilitate the selection of the specific items that will be reviewed during the

onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by September 25, 2023, which will

identify the specific systems and equipment that will be utilized to evaluate the

CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the

cyber-security inspection. We request that the additional information provided from the

second RFI be made available to the regional office prior to the inspection by

October 25, 2023.

The required Table RFI 1 information shall be provided electronically to the lead

inspector by September 12, 2023. If a compact disk (CD) is provided, please provide

four copies (one for each inspector/contactor). The preferred file format for all lists is a

searchable Excel spreadsheet file. These files should be indexed and hyper-linked to

facilitate ease of use. If you have any questions regarding this information, please call

the inspection team leader as soon as possible.

2

Table RFI #1

Request:

IP Ref

1

A list of all Identified CSs/CDAs-highlight/note any additions,

deletions, reclassifications due to new guidance from white papers,

changes to NEI 10-04, 13-10, etc., since the last cyber-security

inspection

Overall

2

A list of Emergency Preparedness and Security onsite and offsite

digital communication systems

Overall

3

Network Topology Diagrams to include information and data flow for

critical systems in levels 2, 3 and 4 (If available)

Overall

4

Ongoing Monitoring and Assessment program documentation

03.01(a)

5

The most recent effectiveness analysis of the Cyber-Security

Program

03.01(b)

6

Vulnerability screening/assessment and scan program documentation

03.01(c)

7

Cyber-Security Incident response documentation, including incident

detection, response, and recovery documentation as well as

contingency plan development, implementation and including any

program documentation that requires testing of security boundary

device functionality

03.02(a)

and

03.04(b)

8

Device Access and Key Control documentation

03.02(c)

9

Password/Authenticator documentation

03.02(c)

10

User Account/Credential documentation

03.02(d)

11

Portable Media and Mobile Device control documentation, including

kiosk security control assessment/documentation

03.02(e)

12

Design change/modification program documentation and a list of all

design changes that affected CDAs that have been installed and

completed since the last cyber-security inspection, including either a

summary of the design change or the 50.59 documentation of the

change

03.03(a)

13

Supply Chain Management documentation including any security

impact analysis for new acquisitions

03.03(a)

, (b) and

(c)

14

Configuration Management documentation including any security

impact analysis performed due to configuration changes since the last

inspection

03.03(a)

and (b)

3

Table RFI #1

Request:

IP Ref

15

Cyber-Security Plan and any 50.54(p) analysis to support changes to

the plan since the last inspection

03.04(a)

16

Cyber-Security Metrics tracked (if applicable)

03.06

(b)

17

Provide documentation describing any cyber-security changes to the

access authorization program since the last cyber-security inspection

Overall

18

Provide a list of all procedures and policies provided to the NRC with

their descriptive name and associated number (if available)

Overall

19

Performance testing report (if applicable)

03.06

(a)

In addition to the above information please provide the following:

(1)

Electronic copy of the Updated Final Safety Analysis Report (UFSAR) and

technical specifications.

(2)

Name(s) and phone numbers for the regulatory and technical contacts.

(3)

Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by August 02, 2023, for the

second RFI (i.e., RFI #2).

II.

Additional Information Requested to be Available Prior to Inspection

As stated in Section I above, the inspection team will examine the returned

documentation requested from Table RFI #1 and submit the list of specific systems

and equipment to your staff by September 25, 2023, for the second RFI (i.e., RFI #2).

The second RFI will request additional information required to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the cyber-

security inspection. The additional information requested for the specific systems and

equipment is identified in Table RFI #2.

The Table RFI #2 information shall be provided electronically to the lead inspector by

October 25, 2023. If a CD is provided, please provide four copies (one for each

inspector/contactor). The preferred file format for all lists is a searchable Excel

spreadsheet file. These files should be indexed and hyper-linked to facilitate ease of

use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

4

Table RFI #2

Request

Items

For the system(s) chosen for inspection provide:

1

Ongoing Monitoring and Assessment activity performed on the

system(s)

03.01(a)

2

All Security Control Assessments for the selected system(s)

03.01(a)

3

All vulnerability screenings/assessments associated with or scans

performed on the selected system(s) since the last cyber-security

inspection

03.01(c)

4

Documentation (including configuration files and rules sets) for

Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),

Host-based Intrusion Detection Systems (HIDS), and Security

Information and Event Management (SIEM) systems for system(s)

chosen for inspection)

03.02(b)

5

Documentation (including configuration files and rule sets) for

intra-security level firewalls and boundary devices used to protect

the selected system(s)

03.02(c)

6

Copies of all periodic reviews of the access authorization list for the

selected systems since the last inspection

03.02(d)

7

Baseline configuration data sheets for the selected CDAs

03.03(a)

8

Documentation on any changes, including Security Impact Analyses,

performed on the selected system(s) since the last inspection

03.03(b)

9

Copies of the purchase order documentation for any new equipment

purchased for the selected systems since the last inspection

03.03(c)

10

Copies of any cyber-security drills performed since the last

inspection, along with any reports or assessments generated

03.02(a)

03.04(b)

11

Copy of the individual recovery plan(s) for the selected system(s)

including documentation of the results the last time the backups

were executed

03.02(a)

03.04(b)

12

Corrective actions taken as a result of cyber-security

incidents/issues to include previous NRC violations and Licensee

Identified Violations since the last cyber-security inspection

03.04(d)

5

III.

Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the

following RFI (i.e., Table 1ST Week Onsite) electronically by November 6, 2023, the first

day of the inspection.

Table 1ST Week Onsite

Request:

Items

1

Any cyber-security event reports submitted in accordance with

10 CFR 73.77 since the last cyber-security inspection

03.04(a)

2

Updated Copies of corrective actions taken as a result of

cyber-security incidents/issues, to include previous NRC violations

and Licensee Identified Violations since the last cyber-security

inspection, as well as vulnerability-related corrective actions

03.04(d)

In addition to the above information please provide the following:

(1)

Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access to

them.

a.

UFSAR, if not previously provided;

b.

Original Final Safety Analysis Report (FSAR) Volumes;

c.

Original Safety Evaluation Report (SER) and Supplements;

d.

FSAR Question and Answers;

e.

Quality Assurance (QA) Plan;

f.

Technical Specifications, if not previously provided; and

g.

Latest Individual Plant Examination and Probabilistic Risk Assessment

(IPE/PRA) Report.

(2)

Vendor Manuals, Assessment and Corrective Actions:

a.

The most recent Cyber-Security QA audit and/or self-assessment; and

b.

Corrective action documents (e.g., condition reports, including status of

corrective actions) generate as a result of the most recent Cyber-Security QA

audit and/or self-assessment.

6

IV.

Information Requested to be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.