ML19290B647: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[05000366/LER-1979-123-03, /03L-0:on 791117,plant Svc Water Pump 2P41-C001B Did Not Meet Required Flow.Pump Declared Inoperable,Limiting Condition for Operation Established.Caused by Normal Wear on Impellers & Seal Rings.Pump Rebuilt & Returned to Svc]]
| number = ML19290B647
| issue date = 12/06/1979
| title = LER 79-123/03L-0:on 791117,plant Svc Water Pump 2P41-C001B Did Not Meet Required Flow.Pump Declared Inoperable,Limiting Condition for Operation Established.Caused by Normal Wear on Impellers & Seal Rings.Pump Rebuilt & Returned to Svc
| author name = Nix R
| author affiliation = GEORGIA POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000366
| license number =
| contact person =
| document report number = LER-79-123-03L, LER-79-123-3L, NUDOCS 7912130421
| package number = ML19290B646
| document type = LICENSEE EVENT REPORT (SEE ALSO AO,RO), TEXT-SAFETY REPORT
| page count = 2
}}
 
=Text=
{{#Wiki_filter:.
NRC FORM 366                                                                                                                                                                                                .
:7 M!                                                                                LICENSEE EVENT REPORT (PLE ASE PRINT On TYf'E rit REQUIRED INF ORMAT ecNTnot etoc.c I.                  I      l    I      i    i    l@
                                                                                        ,e I    Jg 1010101@(41.1111111l@!      LICtNat T vPE JJ bl LAT nd o lij l cl Al El t ( nl 21@L010101010101010              le    f6                        LICENM Nuf.'UEfL d>    26 3 9              LICENIEE Cube
                          ",[,*] Q [0i510]010l316l6}@l_1l1l117)7199111710l6I719l@
T 80
  .                                                                                                                                          A        4      F<EPOR T OATE f> >      EVENT OATE olij                          n                                  DOCmEINUvaER t,d 8                        to          61 EVENT DESCfHPTION AND PROB ABLE CONSEGUENCESin the run mode, while pe h                                    2 3132, Plant Service Unter                                j
- .al2l l Vith the reactor                                                                                                                                                            the AS:!E ;
Plant Service Water Pump, 2P41-C00lI, would not ecct
          ; 3 ) l Pump Operability Test, required by Tech foccs 4.0. 5. The recuired
      ,,                                                                                                                                                                                          _]
:n 14 l l Section XI requirements on rated flow as                                                                                                      The pumo was dec1rrMJ 5800 CP>i.
o l s l [ flow was 6392 GP>f and the actual flow of the punn uns                                                                                                                            1 for eneration en es t+1i sbM ner Tech _Sner io Jc l I inocerable and a If mitinc cendition
_}
50-366/1979 '117.                Public heal _tl and A similar event was reported on LER 2
017 ] l 3. 7.1. 2.                                                                                                                                                                          }
Ed were not            af fected bv this incide_nt.                                                    CovP.            VALVE g j isafety                                                                                                                              A5 CODE            SUFCCOE 6 9                                              C AUSE            CAUrE                  COvPONENT CODE SY STE M                          SL9200E CODE              CCOE I W I A_J @ W@ W @ 13Iz Iz Iz Iz Iz Iz 18 l xl                                                                      2v is            13                                REVfSfCN iTT6'l                                9          10          in 12                                    OCCURRENCE            REFORT TYPE NO s
EVENT VEAR SECUENTI AL REPORT NC.
CODE l0 l3 l                lLl            [.--j            U
                                      '          [7]9j                  [---.          l1 l2 l3 ul                          2a      2>            3a              su              22
                        @          s*C u SS f 'i2'Ro 22 E                              21
                                                                                          ;<                        zi s    5 polit                    VAN TA T.c  c YET HOURS            SE TT D        F CR.'
l@          IJ l1 l0 l5J AE          ACT CN            ON PL A T
[_zj@            W@              l0 10 l0 10 j 40 W@ [JJ@
41              42 l 7.
43                  44 47 3/
W@[347._j@                          J5                JG 3J                                                                                                                                                          The num          j CAUSE DESCRIPTION AND CORRECTIVE                                                                          llersACTIONS
                                                                                                                                                .Ind seal rines.      h
  ._ l t l o j [ Pump f ailure uas due to normal wear on theShe                                                                                      pumppumo was    imae      placed back j
to original specifications.
~
[i l        l l was disassembled and rebuilt and Procedure HNP-2-3182, 31 ant Service Water Puro j
22, 1979 i 7        gin service on November                                                                                                                                                      }
l l3l l Operability Test, was performed satisfactorily.
                                                                                                                                                                                                            }
80 1 4          l 7        8 9 OTHER ST ATUS SC  R DISCOVERY OESCR18 TION
_j 5A $
                                                    . PO.*,E R NA                    j      y@[ Surveillane+ Testinc
                  , s LEJ @ [0 l9 l5 l @l                                                                                                  JoC ATJON OF RELE ASE C NTENT                                                                                                                                                        l ACTIVITY                                        AMOUNT OF ACTIVITY                                                        'i ^                                                SJ RELE ASED C' Rit E 2SE                                                            l          I x^                                    45 i o 8      9 LzJ @ LzJO L_ _10            si 44 1
PERSONNEL E APOSU51ES                                                                                                                                                _'
TYPE      CESCRIPTION -                                    NA                                                                              '
NuvttE R l0l0l0jh[2k.!
mm            .m t 7
                                ' mONNE L ,Nm'4 E SntsCmPoON@
D e
D              Yf
                                                                                                                                                                                        \ n    -.
                                      ~uve,                                                                            NA                    66                                i S
4          ,
lil 11010101@l 8      9                11      12 LOSS 05 Oi10 AV AGE TO F ACILITY 1%5 M7 ss                                                                                i
                    , .,        [';'igiw                                                                                                                                          ""C * " '
a v                                                                                              7 D I 3 1 3 () q q I_ f I I I I I I i i I L i
I i$suf"        ECmPTioN@                                                                NA                                        ce      i.9
_          l7 lol L1JSI-                                                                                                                                    912-367-7781
 
    *-                              NARRATIVE REPORT Georgia Power Company Plant E. 1. Hatch Baxley, Georgia Reportable Occurrence Report No. 50-366/1979-123 On November 17, 1979, with the reactor in the run mode at 95% FMt, the plant staf f was performing plant procedure HSP-2-3182, Plant Service Water Purp Operability Test. This was being run as part of the monthly ASME Section XI inservice inspection program for the plant service water pumps.      During the performance of this procedure it was found that 2P41-C00lL pump would not pump the required flow, 6392 GPM, to meet the procedure requirements. The actual flow was 5800 CPM.
This failure was due to normal expected wear on the pump impeller seal rings and bearings. The service of this pump is pumping raw river water which contains some silt. The as found condition of the pump revealed that the seal ring average clearance was 177% of the original specificaticas and the bearing average clearance was 166% of the original specs. This is the first rebuild for the subject pump since it was initially placed in service in 1977.
The pump was rebuilt and returned to the original specifications. It was placed back in service on November 22, 1979. lhis pump is one of a set of four. The A punp of this set was rebuilt in early November and reperted on LER No. 50-366/1979-117. The D pump of this set is presently out of servi ce now for rebuilding and will be reported on LER No. 50-366/1979-126. This is
'-    the first rebuild for each of these pumps since initial installation.
Presently a study is under way to find ways to extend the service periods for these type pumps at Plant Hatch. Certain design changes have already been incorporated on the Unit 1 Plant Service Water Pumps that have resulted in extending the service periods for these pumps.      Some of these changes were incorporated in the initial design for the Unit 11 pumps and some were incorporated during the start-up phase of Unit II.
The present service period for our plant service pumps on both units appears to be ranging f rom 18 to 24 months of continuous operation.
The RHR Service Water Pumps at Plant Hatch are of this same design and also pump raw river water. These pumps are also included in the study on extending the service period.
1555 098
                                            .}}

Latest revision as of 09:55, 2 January 2025