ML19305D706: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 13: Line 13:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 2
| page count = 2
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:,
Enclorura I
Enclorura I n
    -    n COLLEGE OF ENGINEERING k
COLLEGE OF ENGINEERING k(', ygr VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY
(', ygr       VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY
'Blacksburg, l'irginia 24061 NrcLrAR ACUVAMON AN 41.YSIS TABOR WORY October 2, 1979 Director of Nuclear Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
                                                                                  'Blacksburg, l'irginia 24061 NrcLrAR ACUVAMON AN 41.YSIS TABOR WORY October 2, 1979 Director of Nuclear Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn:   Mr. Robert W. Reid, Chief                             Re: VPI & SU Operating Reactors Branch #4                               Research Reactor Division of Operating Reactors                             Facility License R-62 Docket No. 50-124 Gentlemen:
20555 Attn:
Mr. Robert W. Reid, Chief Re: VPI & SU Operating Reactors Branch #4 Research Reactor Division of Operating Reactors Facility License R-62 Docket No. 50-124 Gentlemen:
Pursuant to 10 CFR Parts 50.51 and 2.109, we respectfully request a renewal of our facility license, as described in the application dated February 5, 1959, and subsequent amendments thereto.
Pursuant to 10 CFR Parts 50.51 and 2.109, we respectfully request a renewal of our facility license, as described in the application dated February 5, 1959, and subsequent amendments thereto.
The new requested term for license R-62 is for a term of 20 years, expiring at midnight on November 16, 1999.
The new requested term for license R-62 is for a term of 20 years, expiring at midnight on November 16, 1999.
The following documents are enclosed as per your letter and enclosure 1, License Renewal Review Items, Contents of Applications dated June 1, 1979: (Sent under seperate ccver)
The following documents are enclosed as per your letter and enclosure 1, License Renewal Review Items, Contents of Applications dated June 1, 1979: (Sent under seperate ccver) 100 KW Nuclear Reactor Plan, sheets lehrough 5 (MuER. W 1.
: 1. 100 KW Nuclear Reactor Plan, sheets lehrough 5 (MuER. W
2.
: 2. Emergency Plan - (preliminary draf t) 8[ O O~h3 I OYO b
Emergency Plan - (preliminary draf t) 8[ O O~h3 I OYO b 3.
: 3. Safety Analysis Report - (preliminary draf t) g 004 0 yo M Subsequent documents will be submitted according. to the following schedule.
Safety Analysis Report - (preliminary draf t) g 004 0 yo M Subsequent documents will be submitted according. to the following schedule.
Document                                               Date
Document Date 1.
: 1. Appendix to the Virginia Tech Reactor facility Emergency Plan.         This Appendix will supply additional information in support of the Emergency Plan as identified in NRC proposed Regulatory Guide 2.XX                                       Jan. 30, 1980
Appendix to the Virginia Tech Reactor facility Emergency Plan.
: 2. Environmental Assessment                                   Jan. 30, 1980
This Appendix will supply additional information in support of the Emergency Plan as identified in NRC proposed Regulatory Guide 2.XX Jan. 30, 1980 2.
: 3. Operator Licenses and Requalification Training Program                                                   Jan. 30,1980 yv,o aco4no H3\
Environmental Assessment Jan. 30, 1980 3.
Operator Licenses and Requalification Training Program Jan. 30,1980 yv,o aco4no H3\\


Facility License R-62 Docket No. 50-124 Page 2 Document                                     Date
Facility License R-62 Docket No. 50-124 Page 2 Document Date 4.
: 4. Technical Specifications                         Feb. 30, 1980
Technical Specifications Feb. 30, 1980 5.
: 5. Physical Security Plan   -
Physical Security Plan March 15, 1980 Sincerely yours, s
March 15, 1980 Sincerely yours, s
Alan P. Curtner Reactor Supervisor
Alan P. Curtner Reactor Supervisor
                                                /Wd_
/Wd_
T. F. Parkinson, Director Nuclear Reactor Laboratory A. H. Krebs
T. F. Parkinson, Director Nuclear Reactor Laboratory
[kJ Vice President of Administration ec: R. A. Teekell, Chairman Radiation Safety Comittee R. H. Miller, Chairman Reactor Safety Subcomittee J
[kJ A. H. Krebs Vice President of Administration ec:
R. A. Teekell, Chairman Radiation Safety Comittee R. H. Miller, Chairman Reactor Safety Subcomittee J
n%y.
n%y.
0 fM Y 4e         1/is/se}}
0 fM Y
4e 1/is/se}}

Latest revision as of 05:31, 2 January 2025

Application for Renewal of Facility License R-62 for Term of 20 Yrs
ML19305D706
Person / Time
Site: 05000124
Issue date: 10/02/1979
From: Curtner A, Krebs A, Parkinson T
VIRGINIA POLYTECHNIC INSTITUTE & STATE UNIV., BLACKSB
To:
References
NUDOCS 8004150431
Download: ML19305D706 (2)


Text

,

Enclorura I n

COLLEGE OF ENGINEERING k(', ygr VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY

'Blacksburg, l'irginia 24061 NrcLrAR ACUVAMON AN 41.YSIS TABOR WORY October 2, 1979 Director of Nuclear Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn:

Mr. Robert W. Reid, Chief Re: VPI & SU Operating Reactors Branch #4 Research Reactor Division of Operating Reactors Facility License R-62 Docket No. 50-124 Gentlemen:

Pursuant to 10 CFR Parts 50.51 and 2.109, we respectfully request a renewal of our facility license, as described in the application dated February 5, 1959, and subsequent amendments thereto.

The new requested term for license R-62 is for a term of 20 years, expiring at midnight on November 16, 1999.

The following documents are enclosed as per your letter and enclosure 1, License Renewal Review Items, Contents of Applications dated June 1, 1979: (Sent under seperate ccver) 100 KW Nuclear Reactor Plan, sheets lehrough 5 (MuER. W 1.

2.

Emergency Plan - (preliminary draf t) 8[ O O~h3 I OYO b 3.

Safety Analysis Report - (preliminary draf t) g 004 0 yo M Subsequent documents will be submitted according. to the following schedule.

Document Date 1.

Appendix to the Virginia Tech Reactor facility Emergency Plan.

This Appendix will supply additional information in support of the Emergency Plan as identified in NRC proposed Regulatory Guide 2.XX Jan. 30, 1980 2.

Environmental Assessment Jan. 30, 1980 3.

Operator Licenses and Requalification Training Program Jan. 30,1980 yv,o aco4no H3\\

Facility License R-62 Docket No. 50-124 Page 2 Document Date 4.

Technical Specifications Feb. 30, 1980 5.

Physical Security Plan March 15, 1980 Sincerely yours, s

Alan P. Curtner Reactor Supervisor

/Wd_

T. F. Parkinson, Director Nuclear Reactor Laboratory

[kJ A. H. Krebs Vice President of Administration ec:

R. A. Teekell, Chairman Radiation Safety Comittee R. H. Miller, Chairman Reactor Safety Subcomittee J

n%y.

0 fM Y

4e 1/is/se