ML19320B087: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:OTTACHMP/T b) | ||
OTTACHMP/T | RECuY@ | ||
Colt Industries Ftirb:nks M rse Cx | |||
,. Engine Division | |||
.b JUN 171980 i m u-'= ^.~e l | |||
l Betoit. Wiscons.n $351: l R. A. MUUORD | |||
Of fice of Inspection & Enforcement | *[,'![,', _, | ||
799 RooseIelt Road | l | ||
Glen Ellyn, Ill. 60137 | ~ | ||
i June 13,1980 W E. e m 9 l-1 6 2. (fM-y) | |||
Of fice of Inspection & Enforcement Q% | |||
799 RooseIelt Road Nb p/ | |||
U. 5. Nuclear Regulatory Commission Glen Ellyn, Ill. 60137 g( | |||
Attention: Mr. James G. Keppler, Director, Region III | Attention: Mr. James G. Keppler, Director, Region III | ||
==Subject:== | ==Subject:== | ||
Colt Industries-Fairbanks Morse Engine Division Emergency Diesel Generators Model 38TD8-1/8 Philadelphia Electric Co. | Colt Industries-Fairbanks Morse Engine Division Emergency Diesel Generators Model 38TD8-1/8 Philadelphia Electric Co. | ||
Limerick Units 1 & 2 Potential Seismic 10CFR50, Part 21 Report dated January 16, 1980 Supplement #1-Limerick Diesel Generators 6, 7 & 8 Gentlemen: | Limerick Units 1 & 2 Potential Seismic 10CFR50, Part 21 Report dated January 16, 1980 Supplement #1-Limerick Diesel Generators 6, 7 & 8 Gentlemen: | ||
The deviation described in our January 16, 1980 Part 21 report was observed on the 6th of 8 Limerick units, | The deviation described in our January 16, 1980 Part 21 report was observed on the 6th of 8 Limerick units, Units 6 and 7 have been corrected by fitting shims at the bolted interface between the diesel generator skid and the heat 4 exchanger mounting feet and between the two heat exchangers mounting feet. | ||
The 8th Limerick unit has been corrected by the heat exchangar vendor machining the warped feet flat and inserting fitted shims in lieu of the spacers previously used. The shims are held in place by the bolts. | The shims have been tack welded in place to permit retaining the fit in the event of disassembly. | ||
The above modifications result in bolted joints with a physical configura-tion identtcal to that analyzed in the seismic report. | The 8th Limerick unit has been corrected by the heat exchangar vendor machining the warped feet flat and inserting fitted shims in lieu of the spacers previously used. | ||
A written procedure has been prepared for modification as necessary for Units 1-5, shipped prior to detection of t&a reported deviation. | The shims are held in place by the bolts. | ||
The above modifications result in bolted joints with a physical configura-tion identtcal to that analyzed in the seismic report. | |||
All three units are free of the reported potential defect. | |||
A written procedure has been prepared for modification as necessary for Units 1-5, shipped prior to detection of t&a reported deviation. | |||
These units will be modified if and as necessary prict to t.eing put into service. | |||
A copy of this report is being forwarded to Philadelphia Electric Company. | A copy of this report is being forwarded to Philadelphia Electric Company. | ||
Very truly yours, N | Very truly yours, N | ||
. fysza J | |||
. M. Moriarty MANAGER UTILI ' ^" | |||
JMM:jc cc: Philadelphia Electric Co. | JMM:jc cc: Philadelphia Electric Co. | ||
2301 Market Street Philadelphia, PA 19101 Attention: Mr. Dick Mulford | 2301 Market Street Philadelphia, PA 19101 Attention: | ||
* w a.m..co .. ,ce. | Mr. Dick Mulford | ||
^+ - | |||
* w a.m..co..,ce. | |||
Limerick Project Manager 8007090 g}} | Limerick Project Manager 8007090 g}} | ||
Latest revision as of 18:42, 1 January 2025
| ML19320B087 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 06/13/1980 |
| From: | Moriarty J COLT INDUSTRIES, INC. |
| To: | |
| Shared Package | |
| ML19320B082 | List: |
| References | |
| NUDOCS 8007090275 | |
| Download: ML19320B087 (1) | |
Text
OTTACHMP/T b)
RECuY@
Colt Industries Ftirb:nks M rse Cx
,. Engine Division
.b JUN 171980 i m u-'= ^.~e l
l Betoit. Wiscons.n $351: l R. A. MUUORD
- [,'![,', _,
l
~
i June 13,1980 W E. e m 9 l-1 6 2. (fM-y)
Of fice of Inspection & Enforcement Q%
799 RooseIelt Road Nb p/
U. 5. Nuclear Regulatory Commission Glen Ellyn, Ill. 60137 g(
Attention: Mr. James G. Keppler, Director, Region III
Subject:
Colt Industries-Fairbanks Morse Engine Division Emergency Diesel Generators Model 38TD8-1/8 Philadelphia Electric Co.
Limerick Units 1 & 2 Potential Seismic 10CFR50, Part 21 Report dated January 16, 1980 Supplement #1-Limerick Diesel Generators 6, 7 & 8 Gentlemen:
The deviation described in our January 16, 1980 Part 21 report was observed on the 6th of 8 Limerick units, Units 6 and 7 have been corrected by fitting shims at the bolted interface between the diesel generator skid and the heat 4 exchanger mounting feet and between the two heat exchangers mounting feet.
The shims have been tack welded in place to permit retaining the fit in the event of disassembly.
The 8th Limerick unit has been corrected by the heat exchangar vendor machining the warped feet flat and inserting fitted shims in lieu of the spacers previously used.
The shims are held in place by the bolts.
The above modifications result in bolted joints with a physical configura-tion identtcal to that analyzed in the seismic report.
All three units are free of the reported potential defect.
A written procedure has been prepared for modification as necessary for Units 1-5, shipped prior to detection of t&a reported deviation.
These units will be modified if and as necessary prict to t.eing put into service.
A copy of this report is being forwarded to Philadelphia Electric Company.
Very truly yours, N
. fysza J
. M. Moriarty MANAGER UTILI ' ^"
JMM:jc cc: Philadelphia Electric Co.
2301 Market Street Philadelphia, PA 19101 Attention:
Mr. Dick Mulford
^+ -
- w a.m..co..,ce.
Limerick Project Manager 8007090 g