*4 N_C scru 195 u.s. NuCLEAa :tEGULATORY f MIS $lON DOCKET NUMLEn (2 788 50-313 NRC" DISTRIBUTION PoR PART 50 DOCKET MATERIAL T:
l
FROM-DATE OP 00CUMENT Arkansas Po* er & Light Company 9/30/76 Mr. Dennis L. Ziemann Little Rock, Arkansas DATE RECElVED tl. !!. Murphey 10/12/76 LLETTER O NOTORIZ E D PROP INPUT PORM NUMBER OF COPIES RECEIVED CoRio NAL
          *
$itusCLAssiPiEo One signed
  *4 N_C scru 195                                           u.s. NuCLEAa :tEGULATORY f                 MIS $lON   DOCKET NUMLEn (2 788                                                                                                                 50-313               l
& OPY OEICalPTION ENCLOSURE Ltr. notorized 9/30/76...re our 6/7/76 Itr.
                                                                                                                  "''"""''"
...trans the following:
NRC" DISTRIBUTION PoR PART 50 DOCKET MATERIAL                                                                                   l l
Furnishing requested changes to various tech specs in order to delete responses to
T:                                               FROM-                                           .            DATE OP 00CUMENT Arkansas Po* er & Light Company                                       9/30/76               l Mr. Dennis L. Ziemann                   Little Rock, Arkansas                                       DATE RECElVED tl. !!. Murphey                                                       10/12/76 LLETTER                 O NOTORIZ E D           PROP                               INPUT PORM                 NUMBER OF COPIES RECEIVED CoRio NAL         $itusCLAssiPiEo
" refueling period", refueling outag.e", and
* One signed           l
" refuel! ; shutdown", and in their place, insert time period which would more readily be in.. p re ted.
      & OPY
                                                                                                                                                '
OEICalPTION                                                               ENCLOSURE Ltr. notorized 9/30/76...re our 6/7/76 Itr.
      ...trans the following:                                                 Furnishing requested changes to various tech specs in order to delete responses to
                                                                              " refueling period", refueling outag.e", and                     )
                                                                              " refuel! ; shutdown", and in their place, insert       time period which would more readily be in. . p re ted .
PLANT NAME:
PLANT NAME:
ACKNOWLEDGED t
ACKNOWLEDGED t
l Arkansas Unt'
DONOT EEM0yE Arkansas Unt'
* DONOT EEM0yE SAFETY                             FOR ACTION /INFORMATION                           ENVTRO           10/13/76       RJL I
* SAFETY FOR ACTION /INFORMATION ENVTRO 10/13/76 RJL 3
3
* COICNED AD:
* COICNED AD:                                         _
I h
h                   AR4TCNFn Ant                               __
AR4TCNFn Ant gBRANCH CHIEF:
gBRANCH CHIEF:                           Ziemann       (#/                             BRANCH CMTFF.
Ziemann
YPROJECT MANAGER:                       Converse                                     PROJECT MANAGER:
(#/
M'LIC. ASST.:                           Dir,ns                                       LIC. ASST.!
BRANCH CMTFF.
v INTERNAL OlSTRIBUTION YREGFILD                               SYSTEMS SAFETY                             PLANT sYsTFvs                         SITE SAFETY &
YPROJECT MANAGER:
M     NRC PDR                         HEINEMAN                                   TFnFsco                               ENVIRO ANALYSIS VI&E           /2. )
Converse PROJECT MANAGER:
                  * '
M'LIC. ASST.:
SCHROEDER                                   BENAROYA                             DENTON & MUT LFR k OELD s                                                                         LAINAS h'GOSSICK & STAFF                     ENGINEFP.ING                               IPPOLITO                             ENVIRO TECH _
Dir,ns LIC. ASST.!
i]IPC                                 BACCARRY                                   KIRKWOOD                             FRNST CASE                             KNIGHT                                                                           BALLARD HANAUER                           SIHWEIL                                   OPERATING REACTORS                   SPANGLER HARLEIS                           PAWLICKI                                   STELLO 9TTP TFPM PROJECT MANAGEMENT               REACTOR SAFETY                             OPERATING TECH.                       CAMMTLL
v INTERNAL OlSTRIBUTION YREGFILD SYSTEMS SAFETY PLANT sYsTFvs SITE SAFETY &
                                                                                '
M NRC PDR HEINEMAN TFnFsco ENVIRO ANALYSIS VI&E
BOYD                             ROSS                         V           EISENHITT     [h.       )             STEPP               I P. COLLINS                       NOVAK                       V             SHA0                                 HULMAN H0_USTON                         ROSZTOCZY
/2. )
                                                                    '
SCHROEDER BENAROYA DENTON & MUT LFR k OELD s LAINAS h'GOSSICK & STAFF ENGINEFP.ING IPPOLITO ENVIRO TECH _
V            BAER                                                    /
i]IPC BACCARRY KIRKWOOD FRNST CASE KNIGHT BALLARD HANAUER SIHWEIL OPERATING REACTORS SPANGLER HARLEIS PAWLICKI STELLO 9TTP TFPM PROJECT MANAGEMENT REACTOR SAFETY OPERATING TECH.
PETERSON                         CHECK
CAMMTLL BOYD ROSS V
                                                                  ~
EISENHITT
M              BITTLER                               SITE ANALYSIS     I MELTZ                                                         v ' GRIMES
[h. )
                                                                      '
STEPP I
VOLLMER            \
P. COLLINS NOVAK V
HELTE_MES                       AT &_I                                                                           BUNCH               I SKOVHOLT                         SALTZMAN                                                               M 3 d OLLISS
SHA0 HULMAN H0_USTON ROSZTOCZY V
                                                                                                                ,
BAER
RUTRERG                                                                         VRFCFR EXTEHN AL Dl5TRl0UTION
/
                                            ~
PETERSON CHECK M
CONTROL NUMBER LPDR: Russellville.    .s r k, N5T TAB:                                     B!m0K]tAEN_NAT LAB                         /
BITTLER SITE ANALYSIS I
      ' TIC:                             REG. VIE                                   ULRIKSON(ORNL)                         v/
MELTZ
ESIC:                             LA PDR_                                                                           j ASLB;                             CONSULTANTS                                                     n a             /
~
1ACRS/4CYS         "^g DT.h ENT @ W 4.                             _ _ _ _
' GRIMES VOLLMER
OU d. 422O p
\\
_
v HELTE_MES AT &_I BUNCH I
SKOVHOLT SALTZMAN M 3 d OLLISS RUTRERG VRFCFR EXTEHN AL Dl5TRl0UTION CONTROL NUMBER
.s k, N5T TAB:
~
LPDR: Russellville.
B!m0K]t EN_NAT LAB
/
A r
' TIC:
REG. VIE ULRIKSON(ORNL) v/
ESIC:
LA PDR_
j ASLB; CONSULTANTS
/
n a OU d. 422O 1ACRS/4CYS
"^g DT.h ENT @ W 4.
t p
N_,_,.,.,
N_,_,.,.,
t


*    ,
H ELPIN G BUILO ARKANSAS ARK ANS AS POWER & LIGHT COMPANY STH & LCulSIAN A ST AEETS. LITTLE AOCK. A;4K ANSAS 72203.[501)372-4311 September 30, 1976 Director of Nuclear Reactor Regulation ATTN:
_
Mr. Dennis L. Ziemann, Chief Operating Reactor Branch #2 U. S. Nuclear Regulatory Commission Washington, D. C.
                      '
20555
        .      ,
\\g L-
  .
-A.
H ELPIN G BUILO ARKANSAS ARK ANS AS POWER & LIGHT COMPANY STH & LCulSIAN A ST AEETS . LITTLE AOCK. A;4K ANSAS 72203.[501)372-4311 September 30, 1976 Director of Nuclear Reactor Regulation ATTN: Mr. Dennis L. Ziemann, Chief Operating Reactor Branch #2                                                     .
u,
U. S. Nuclear Regulatory Commission                                                     >
                                                                                                      '
Washington, D. C.               20555                                                 \g         L-
                                                                                                      -A.'      u,


==Subject:==
==Subject:==
Arkansas Power 4 Light Company                               ; js                     ;'
Arkansas Power 4 Light Company
Arkansas Nuclear One-Unit 1                             (by                 7 Docket No. 50-313                                               Y y"~ .. ' '
; js Arkansas Nuclear One-Unit 1 (by 7
License No. DPR-51                                                 -
Docket No. 50-313 Y y"~.. ' '
Proposed Technical Specifications Gentlemen:
License No. DPR-51 Proposed Technical Specifications Gentlemen:
Your letter of June 7,1976, to Mr. J. D. Phillips requested changes to various Technical Specifications in order to delete references to
Your letter of June 7,1976, to Mr. J. D. Phillips requested changes to various Technical Specifications in order to delete references to
            " refueling period", " refueling outage", and " refueling shutdown", and, in their place, insert a time period which would more readily be inter-preted. Attached find those changes as requested, save those exceptions Nhich are delineated below.
" refueling period", " refueling outage", and " refueling shutdown", and, in their place, insert a time period which would more readily be inter-preted. Attached find those changes as requested, save those exceptions Nhich are delineated below.
Specification                               Reason for Exception 4.4.1.2.5       ,,,e,                       Item 2 of your letter requested a change to those specifications with 9*.-q
Specification Reason for Exception 4.4.1.2.5,,,e, Item 2 of your letter requested a 9*.-q ' p change to those specifications with
                            ,[
,[
                            '
reference to " refueling period". The
                                      'p                        reference to " refueling period". The
* g ') ( /, Js change to Specification 4.4.1.2.5
                                                                                                                                      -
.m c;.c p, /,
* g ') ( / , Js .m
. i.U_ -l[k' e.
                -
f.f.'
                        .                                        change to Specification 4.4.1.2.5 reflects the requirements of Appendix J
reflects the requirements of Appendix J
                                          '
' x '?
c;.c   p , /,
% 's of 10CFR50.
f.f .'
'V.V geo N
                                      . i .U_ -l[k'
,%\\ The last sentence of this specification
                                ' x '?             % 's e . of 10CFR50.
: 4. 6.1. 3 '
    'V.V                                   geo         N   .
M 7-j has been deleted as it adds no further p
: 4. 6.1. 3 '             M
/
                                                          ,%\  The last sentence of this specification 7-j has been deleted as it adds no further p         ,
pl meaning to the requirement. The remaining
                                      /                   pl meaning to the requirement. The remaining
'.. o u2*to" & -}/
                                      ' . . o u2*to" & - portion has been changed to reflect the
portion has been changed to reflect the
                                    * ' ,$/d7             }/    request in Item 4 of your letter.
* ',$/d7 request in Item 4 of your letter.
q ,-
q,-
                                                      '"
4.12.3(a) of the above mentioned letter requested a change to this specification, but no reference to
4.12.3(a)           -        <
" refueling period" was found.
Enclosure 1 of the above mentioned letter requested a change to this specification, but no reference to
                                                                " refueling period" was found.
:
                                                                                                                    #
P
P
_L
_L
* e .Aut i A T A X A AYtNG. INVE STO A CWN E O                   MEMBE A MICOLE SOUTH UTateTIES SYSTEM
* e.Aut i A T A X A AYtNG. INVE STO A CWN E O MEMBE A MICOLE SOUTH UTateTIES SYSTEM


                                                                  - _ _ _  __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Mr. Dennis L. Ziemann S:ptmabsr 30, 1976 4
  .
Specification Reason for Exception 4.12.4 This specification was not noted in your Enclosure 1, but is associated with " refueling period". Therefore, a change has been made to comply with your request.
                          '
4.0 provided a model specifica-tion to replace the existing specifica-tion. However, we do not wish to change this specification because we feel that our present specification is adequate and accomplishes the same purpose.
            .      .
4.1.b Item 4 of your letter requested a change Table 4.1-2 to those surveillance items presently Items 1 and 5 required to be performed each " refueling shutdown" or " refueling outage" which are not directly associated with refueling.
      .      .
)
    .
A refueling shutdown is required to perform these surveillance items; therefore, no change has been made.
              . Mr. Dennis                 S:ptmabsr 30, 1976 4
4.2.4 Item 4 of your letter requested a change to those surveillance items presently required to be performed each " refueling shutdown" or " refueling outage" which are not directly associated with refueling.
Specification     Reason for Exception 4.12.4           This specification was not noted in your Enclosure 1, but is associated with " refueling period". Therefore, a change has been made to comply with your request.
A refueling shutdown is required to perform this surveillance item; therefore, no change has been made.
-                      4.0             Enclosure 2 provided a model specifica-tion to replace the existing specifica-tion. However, we do not wish to change this specification because we feel that our present specification is adequate and accomplishes the same purpose.
4.2.6 No change has been made to this specifica-tion as we see no benefit in such a wording change.
4.1.b             Item 4 of your letter requested a change Table 4.1-2       to those surveillance items presently Items 1 and 5   required to be performed each " refueling shutdown" or " refueling outage" which are not directly associated with refueling.
4.4.1.1.4 alludes to the fact that a reference is made to " refueling shutdown" or " refueling outage". However, no such wording exists in this specification, thus no change has been made.
                                                                                                                        )
4.4.1.3 The acceptance criteria referenced in this Specification are found in Specifications 4.4.1.1 and 4.4.1.2 rather than Specifications 4.3.1.1 and 4.3.1.2 respectively.
A refueling shutdown is required to perform                                     -
4.4.1.5 Item 4 of your letter requested a change to those surveillance items presently required to be performed each " refueling
these surveillance items; therefore, no change has been made.
4.2.4             Item 4 of your letter requested a change                                   .
to those surveillance items presently required to be performed each " refueling shutdown" or " refueling outage" which                                           l are not directly associated with refueling.                                       !
A refueling shutdown is required to perform this surveillance item; therefore, no                                           i change has been made.
4.2.6           No change has been made to this specifica-                                     '
tion as we see no benefit in such a wording change.
4.4.1.1.4       Enclosure 3 alludes to the fact that a                                     -
reference is made to " refueling shutdown" or " refueling outage". However, no such wording exists in this specification, thus no change has been made.
4.4.1.3         The acceptance criteria referenced in this Specification are found in Specifications 4.4.1.1 and 4.4.1.2 rather than Specifications 4.3.1.1 and 4.3.1.2 respectively.
4.4.1.5         Item 4 of your letter requested a change to those surveillance items presently required to be performed each " refueling
          ,                                                                                                    -


s                                                                 .-
s ltr. Dennis L. Ziemann
                                      -                                                -
--3 S;ptembsr 30, 1976 Specification Reason for Exception 4.4.1.5 (cont 'd) shutdown" or " refueling outage" which are not directly associated with refueling.
  '  '
ltr. Dennis L. Ziemann         --3   -
S;ptembsr 30, 1976
    -
        .
                .
                                                                                    .
Specification           Reason for Exception 4.4.1.5 (cont 'd)       shutdown" or " refueling outage" which are not directly associated with refueling.
A refueling shutdown is required to perform this surveillance item; therefore, no change has been made.
A refueling shutdown is required to perform this surveillance item; therefore, no change has been made.
4.4.2.4.2               No change has been made to this specification as the specification will become obsolete after Cycle 1. Specification 4.4.2.4.4 will then become effective and this requirement will be dropped or new specifications will be developed.
4.4.2.4.2 No change has been made to this specification as the specification will become obsolete after Cycle 1.
4.7.1.1                 Item 4 of your letter requested a change to those surveillance items presently required to be performed each " refueling shutdown" or " refueling outage" which are not directly associated with refueling.
Specification 4.4.2.4.4 will then become effective and this requirement will be dropped or new specifications will be developed.
4.7.1.1 Item 4 of your letter requested a change to those surveillance items presently required to be performed each " refueling shutdown" or " refueling outage" which are not directly associated with refueling.
A refueling shutdown is required to perform this surveillance item; therefore, no change has been made.
A refueling shutdown is required to perform this surveillance item; therefore, no change has been made.
4.15.1             -
4.15.1 This specification will become obsolete at the beginning of Cycle 2.
This specification will become obsolete at the beginning of Cycle 2. Therefore, no change has been made.
Therefore, no change has been made.
4.15.2
4.15.2 No change has been made to this specifi-cation. Per our letter to you of June 9, 1976, revisions to Technical Specifications shall be made per the requirements of 10CFR50.55a(g)(5)(ii) before our next 40 month inspection interval begins.
                                                                                          .
4.16.1 No change has been made to this specification as it is presently covered by another Technical Specification Change Proposal.
No change has been made to this specifi-cation. Per our letter to you of June 9, 1976, revisions to Technical Specifications shall be made per the requirements of 10CFR50.55a(g)(5)(ii) before our next 40 month inspection interval begins.
4.17.2.a No change has been made to this specifi-cation as we see no logical need to test the fuel handling area ventilation system unless irradiated fuel is going to be handled. The specification already covers the surveillance to meet those Limiting Conditions for Operation of 3.15.1.a, and c, which is all that is required for system operability. This concern has already been discussed and resolved prior to the issuance of Amendment No.10 to these Tech-nical Specifications.
4.16.1                 No change has been made to this specification as it is presently covered by another Technical   '
l L
Specification Change Proposal.
I
4.17.2.a                 No change has been made to this specifi-cation as we see no logical need to test the fuel handling area ventilation system unless irradiated fuel is going to be handled. The specification already covers the surveillance to meet those Limiting Conditions for Operation of 3.15.1.a, and c, which is all that is required for system operability. This concern has already been discussed and resolved prior to the issuance of Amendment No.10 to these Tech-nical Specifications.
l
.
L                                                                                              I


.  .
,, Mr. Dennis L. Ziemann Sap * 'bsr 30, 1976 Specification Reason for Exception ~
:
4.6.3 Although no change to this specification was requested, we propose a change to this surveillance test that is consistent with other proposals submitted herein.
      , , Mr. Dennis L. Ziemann                             Sap * 'bsr 30, 1976
4.17.3 Although no change to this specification was requested, we have added additional wording as we see no need to repeat this surveillance test if performed within the previous 30 days.
  .
Please be advised that the deletion of " refueling shutdown" and the insertion of "every 18 months" does not apply until cycles subsequent to Cycle 1.
        .
This is due to the extended length of Cycle I as-compared to following cycles, as well as the fact that the specifications logically require these surveil--
Specification                 Reason for Exception ~
4.6.3                         Although no change to this specification was requested, we propose a change to this surveillance test that is consistent with other proposals submitted herein.
4.17.3                       Although no change to this specification was requested, we have added additional wording as we see no need to repeat this surveillance test if performed within the previous 30 days.
Please be advised that the deletion of " refueling shutdown" and the insertion of "every 18 months" does not apply until cycles subsequent to Cycle 1. This is due to the extended length of Cycle I as-compared to following cycles, as well as the fact that the specifications logically require these surveil--
lances to be done only during shutdowns associated with refueling.
lances to be done only during shutdowns associated with refueling.
If you have any questions and/or comments concerning the above, please contact us.
If you have any questions and/or comments concerning the above, please contact us.
Very truly yours, M       y Senior Vice President WMM:ay
Very truly yours, M
                                                                                          .
y Senior Vice President WMM:ay


                        .-              -            .    .    ..          -                  --
STATI: OF ARKANSAS l-1 SS COUNTY OF Pill.ASK!
  .  .
)
        .,        .
W. bl.' Mu rphey being duly sworn, states that he is a Senior Vice President of Arkansas Power f, l.ight Company; that he is authori:ed on the part of said Company to -ign and file with the Nuclear Regulatory Comission this Supplementary in fo nna t i nn ; that he has reviewed or caused to have reviewed all of the statement s contained in such Infonnation, and that ali such statements made and mat ters set fo rt h the rein a re t rue and 4
    .      .
correct to the best of his knowledge, in fo rma t i on and bel ie f.
                      .
/n
STATI: OF ARKANSAS           l-
'W.M. [ phy h
'
h l
                  .
SUBSCRIBED AND SWORN II) before me, a Notary Public in and for the 5
1     SS COUNTY OF Pill.ASK!           )
M b day of k N a _._0 m _.
W. bl.' Mu rphey   being duly sworn, states that he is a Senior Vice President of Arkansas Power f, l.ight Company; that he is authori:ed on the part of said Company to -ign and file with the Nuclear Regulatory Comission                                   ;
County and State above named, this 1976.
this Supplementary in fo nna t i nn ; that he has reviewed or caused to have
hik S. bk ws Nota ry I'ub t t e
'
- Sty Commission !!xpi res:
reviewed all of the statement s contained in such Infonnation, and that 4
Ma rch 1, 1978 w
ali such statements made and mat ters set fo rt h the rein a re t rue and correct to the best of his knowledge, in fo rma t i on and bel ie f.
w m
                                                                                  /n
vr-T w
                                                                        'W.M. [ phy
=-
                                                                            -
rv f=P T''}}
                                                                                                                    .      .
h h
5 l
;                    SUBSCRIBED AND SWORN II) before me, a Notary Public in and for the
                                                                          -
                                                                                                                      >
                                                                                                                      .
County and State above named, this            M b day of k N a               _._0 m _. , 1976.
'
hik               S. bk Nota ry I'ub t t e ws
.
          - Sty Commission !!xpi res:
Ma rch 1, 1978
                                                                                                                            !
I
'
w w    m   vr-T                     w         =-   rv f=P     T''}}

Latest revision as of 08:45, 31 December 2024

Submits Proposed Tech Specs Change Re Deleting of Refs to Refueling Period,Refueling Outage & Refueling Shutdown & Inserting Time Period in Place of Ref Terms
ML19326C281
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/30/1976
From: Murphey W
ARKANSAS POWER & LIGHT CO.
To: Ziemann D
Office of Nuclear Reactor Regulation
Shared Package
ML19326C282 List:
References
NUDOCS 8004220842
Download: ML19326C281 (6)


Text

,

  • 4 N_C scru 195 u.s. NuCLEAa :tEGULATORY f MIS $lON DOCKET NUMLEn (2 788 50-313 NRC" DISTRIBUTION PoR PART 50 DOCKET MATERIAL T:

FROM-DATE OP 00CUMENT Arkansas Po* er & Light Company 9/30/76 Mr. Dennis L. Ziemann Little Rock, Arkansas DATE RECElVED tl. !!. Murphey 10/12/76 LLETTER O NOTORIZ E D PROP INPUT PORM NUMBER OF COPIES RECEIVED CoRio NAL

$itusCLAssiPiEo One signed

& OPY OEICalPTION ENCLOSURE Ltr. notorized 9/30/76...re our 6/7/76 Itr.

...trans the following:

Furnishing requested changes to various tech specs in order to delete responses to

" refueling period", refueling outag.e", and

" refuel! ; shutdown", and in their place, insert time period which would more readily be in.. p re ted.

PLANT NAME:

ACKNOWLEDGED t

DONOT EEM0yE Arkansas Unt'

  • SAFETY FOR ACTION /INFORMATION ENVTRO 10/13/76 RJL 3
  • COICNED AD:

I h

AR4TCNFn Ant gBRANCH CHIEF:

Ziemann

(#/

BRANCH CMTFF.

YPROJECT MANAGER:

Converse PROJECT MANAGER:

M'LIC. ASST.:

Dir,ns LIC. ASST.!

v INTERNAL OlSTRIBUTION YREGFILD SYSTEMS SAFETY PLANT sYsTFvs SITE SAFETY &

M NRC PDR HEINEMAN TFnFsco ENVIRO ANALYSIS VI&E

/2. )

SCHROEDER BENAROYA DENTON & MUT LFR k OELD s LAINAS h'GOSSICK & STAFF ENGINEFP.ING IPPOLITO ENVIRO TECH _

i]IPC BACCARRY KIRKWOOD FRNST CASE KNIGHT BALLARD HANAUER SIHWEIL OPERATING REACTORS SPANGLER HARLEIS PAWLICKI STELLO 9TTP TFPM PROJECT MANAGEMENT REACTOR SAFETY OPERATING TECH.

CAMMTLL BOYD ROSS V

EISENHITT

[h. )

STEPP I

P. COLLINS NOVAK V

SHA0 HULMAN H0_USTON ROSZTOCZY V

BAER

/

PETERSON CHECK M

BITTLER SITE ANALYSIS I

MELTZ

~

' GRIMES VOLLMER

\\

v HELTE_MES AT &_I BUNCH I

SKOVHOLT SALTZMAN M 3 d OLLISS RUTRERG VRFCFR EXTEHN AL Dl5TRl0UTION CONTROL NUMBER

.s k, N5T TAB:

~

LPDR: Russellville.

B!m0K]t EN_NAT LAB

/

A r

' TIC:

REG. VIE ULRIKSON(ORNL) v/

ESIC:

LA PDR_

j ASLB; CONSULTANTS

/

n a OU d. 422O 1ACRS/4CYS

"^g DT.h ENT @ W 4.

t p

N_,_,.,.,

H ELPIN G BUILO ARKANSAS ARK ANS AS POWER & LIGHT COMPANY STH & LCulSIAN A ST AEETS. LITTLE AOCK. A;4K ANSAS 72203.[501)372-4311 September 30, 1976 Director of Nuclear Reactor Regulation ATTN:

Mr. Dennis L. Ziemann, Chief Operating Reactor Branch #2 U. S. Nuclear Regulatory Commission Washington, D. C.

20555

\\g L-

-A.

u,

Subject:

Arkansas Power 4 Light Company

js Arkansas Nuclear One-Unit 1 (by 7

Docket No. 50-313 Y y"~.. ' '

License No. DPR-51 Proposed Technical Specifications Gentlemen:

Your letter of June 7,1976, to Mr. J. D. Phillips requested changes to various Technical Specifications in order to delete references to

" refueling period", " refueling outage", and " refueling shutdown", and, in their place, insert a time period which would more readily be inter-preted. Attached find those changes as requested, save those exceptions Nhich are delineated below.

Specification Reason for Exception 4.4.1.2.5,,,e, Item 2 of your letter requested a 9*.-q ' p change to those specifications with

,[

reference to " refueling period". The

  • g ') ( /, Js change to Specification 4.4.1.2.5

.m c;.c p, /,

. i.U_ -l[k' e.

f.f.'

reflects the requirements of Appendix J

' x '?

% 's of 10CFR50.

'V.V geo N

,%\\ The last sentence of this specification

4. 6.1. 3 '

M 7-j has been deleted as it adds no further p

/

pl meaning to the requirement. The remaining

'.. o u2*to" & -}/

portion has been changed to reflect the

  • ',$/d7 request in Item 4 of your letter.

q,-

4.12.3(a) of the above mentioned letter requested a change to this specification, but no reference to

" refueling period" was found.

P

_L

  • e.Aut i A T A X A AYtNG. INVE STO A CWN E O MEMBE A MICOLE SOUTH UTateTIES SYSTEM

Mr. Dennis L. Ziemann S:ptmabsr 30, 1976 4

Specification Reason for Exception 4.12.4 This specification was not noted in your Enclosure 1, but is associated with " refueling period". Therefore, a change has been made to comply with your request.

4.0 provided a model specifica-tion to replace the existing specifica-tion. However, we do not wish to change this specification because we feel that our present specification is adequate and accomplishes the same purpose.

4.1.b Item 4 of your letter requested a change Table 4.1-2 to those surveillance items presently Items 1 and 5 required to be performed each " refueling shutdown" or " refueling outage" which are not directly associated with refueling.

)

A refueling shutdown is required to perform these surveillance items; therefore, no change has been made.

4.2.4 Item 4 of your letter requested a change to those surveillance items presently required to be performed each " refueling shutdown" or " refueling outage" which are not directly associated with refueling.

A refueling shutdown is required to perform this surveillance item; therefore, no change has been made.

4.2.6 No change has been made to this specifica-tion as we see no benefit in such a wording change.

4.4.1.1.4 alludes to the fact that a reference is made to " refueling shutdown" or " refueling outage". However, no such wording exists in this specification, thus no change has been made.

4.4.1.3 The acceptance criteria referenced in this Specification are found in Specifications 4.4.1.1 and 4.4.1.2 rather than Specifications 4.3.1.1 and 4.3.1.2 respectively.

4.4.1.5 Item 4 of your letter requested a change to those surveillance items presently required to be performed each " refueling

s ltr. Dennis L. Ziemann

--3 S;ptembsr 30, 1976 Specification Reason for Exception 4.4.1.5 (cont 'd) shutdown" or " refueling outage" which are not directly associated with refueling.

A refueling shutdown is required to perform this surveillance item; therefore, no change has been made.

4.4.2.4.2 No change has been made to this specification as the specification will become obsolete after Cycle 1.

Specification 4.4.2.4.4 will then become effective and this requirement will be dropped or new specifications will be developed.

4.7.1.1 Item 4 of your letter requested a change to those surveillance items presently required to be performed each " refueling shutdown" or " refueling outage" which are not directly associated with refueling.

A refueling shutdown is required to perform this surveillance item; therefore, no change has been made.

4.15.1 This specification will become obsolete at the beginning of Cycle 2.

Therefore, no change has been made.

4.15.2 No change has been made to this specifi-cation. Per our letter to you of June 9, 1976, revisions to Technical Specifications shall be made per the requirements of 10CFR50.55a(g)(5)(ii) before our next 40 month inspection interval begins.

4.16.1 No change has been made to this specification as it is presently covered by another Technical Specification Change Proposal.

4.17.2.a No change has been made to this specifi-cation as we see no logical need to test the fuel handling area ventilation system unless irradiated fuel is going to be handled. The specification already covers the surveillance to meet those Limiting Conditions for Operation of 3.15.1.a, and c, which is all that is required for system operability. This concern has already been discussed and resolved prior to the issuance of Amendment No.10 to these Tech-nical Specifications.

l L

I

,, Mr. Dennis L. Ziemann Sap * 'bsr 30, 1976 Specification Reason for Exception ~

4.6.3 Although no change to this specification was requested, we propose a change to this surveillance test that is consistent with other proposals submitted herein.

4.17.3 Although no change to this specification was requested, we have added additional wording as we see no need to repeat this surveillance test if performed within the previous 30 days.

Please be advised that the deletion of " refueling shutdown" and the insertion of "every 18 months" does not apply until cycles subsequent to Cycle 1.

This is due to the extended length of Cycle I as-compared to following cycles, as well as the fact that the specifications logically require these surveil--

lances to be done only during shutdowns associated with refueling.

If you have any questions and/or comments concerning the above, please contact us.

Very truly yours, M

y Senior Vice President WMM:ay

STATI: OF ARKANSAS l-1 SS COUNTY OF Pill.ASK!

)

W. bl.' Mu rphey being duly sworn, states that he is a Senior Vice President of Arkansas Power f, l.ight Company; that he is authori:ed on the part of said Company to -ign and file with the Nuclear Regulatory Comission this Supplementary in fo nna t i nn ; that he has reviewed or caused to have reviewed all of the statement s contained in such Infonnation, and that ali such statements made and mat ters set fo rt h the rein a re t rue and 4

correct to the best of his knowledge, in fo rma t i on and bel ie f.

/n

'W.M. [ phy h

h l

SUBSCRIBED AND SWORN II) before me, a Notary Public in and for the 5

M b day of k N a _._0 m _.

County and State above named, this 1976.

hik S. bk ws Nota ry I'ub t t e

- Sty Commission !!xpi res:

Ma rch 1, 1978 w

w m

vr-T w

=-

rv f=P T