ML19329B869: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
(No difference)
|
Latest revision as of 06:49, 31 December 2024
| ML19329B869 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 05/27/1976 |
| From: | Skovholt D Office of Nuclear Reactor Regulation |
| To: | Deyoung R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19329B870 | List: |
| References | |
| NUDOCS 8002060875 | |
| Download: ML19329B869 (1) | |
Text
_
pacts @
igoOk6((//g
~
MAY E7 1976
/
Docket lio(O 50-345 j
v R. C. DeYoung, Assistant Director for Light Water Reactors, PM RESPCiSE TG STAllDARD REVIEU ASSI&mE:1T, DAVIS BESSE :iUCLEAR POWER STATICli U:iIT 1, CIVIEW 0F FSAR CHAPTESS 13 AllD 14 Applicant: Toledo Edison Company Licensing Staga: CL Branch and LP't:
Luc.-4, L. Engle Review 3 ranch:
ISaEP:R!
Recuested Completion Date:
'!cno Review Status:
SER Input Complete We have reviewed Anandments 30, 32, 33, and 35 to the subject FSA.1 wnich contained revisions to Davis Besse 1 FSAit Sections 13 and 14.
As a result of t'1is reviatv, we have detamined tnat the draf t Safety Evaluation Report catarial forwarded to you by memorandum dated June 16, 1975 needs updating. Therefore, the attached report contains revised draft input for tuo Safety Evaluation Report, Sections 13.1, 13.3, and 13.C, relative to our review.
.~.
- cnald J. Skovholt Assistant Jirector for Quality Assuranc2 and Scrations
- ivision of Project
- *anacement E. closura:
Draft Input for SE.1 pa cc: w/ enclosure og n 3cyd
'7. McDAnald
~
~TM~
D
'1. Gutler
~J('/$
~'
C L. E1cle
. Pouston DIST:
C. Van Tiiel Docket Files IS&EP R/F DJSkovhol t
^
IS"Pf)M IS&E,P:PM ADQ@PM
- RVndeYidir RWHoustan DJSicd holt 5/h/76 5/gl76 5/h/76 Forms AEC 318 (Rev. 9 33) ARCM 0240
- u. s. novsmasseant reps 7sme orricas se7*.sae see 8002060
[
[