NRC Generic Letter 1978-13: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
(No difference)
|
Revision as of 11:56, 4 March 2018
| ML031280385 | |
| Person / Time | |
|---|---|
| Issue date: | 04/21/1978 |
| From: | Miller J R Office of Nuclear Reactor Regulation |
| To: | |
| References | |
| NUREG-0219 GL-78-013 | |
| Download: ML031280385 (2) | |
- 1 ~ -UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, D. C. 20555April 21, 1978At- 2fi-(All Power Reactor Licensees and ApplicantsGentlemen:This letter and enclosed NUREG 0219, Draft 2 are being sent to'all licenseesauthorized to operate a nuclear power reactor and to all applicants withapplications for a license to operate or construct a power reactor.NUREG 0219 outlines the current position of the NRR staff on implementationof the requirement to upgrade the qualification, training and equipping ofsecurity personnel. Since this is a draft, I would appreciate your commentsby May 19, 1978 so that actual plant operating experience with securitypersonnel can be factored into the final document.
Sincerely,;'I7-1I-IJames R. Miller, Assistant Directorfor Reactor SafeguardsDivision of Operating Reactors
Enclosure:
NUREG 0219 V1Commonwealth Edison CompanyccMr. John W. RoweIsham, Lincoln & BealeCounselors at LawOne First National Plaza,Chicago, Illinois 6060342nd FloorMr. B. B. StephensonPlant SuperintendentDresden Nuclear Power StationRural Route #1Morris, Illinois 60450Morris Public Library604 Liberty StreetMorris, Illinois 60451