ML19344F012: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:-- | {{#Wiki_filter:-- | ||
9 | 9 77 G.- | ||
DUICE Powen COMPANY rowen ucitomo USNRC REr...: | |||
DUICE Powen COMPANY rowen ucitomo | |||
422 Sourn Cnuncu Srazer, Csuntorrh,h d.Idh 'IFi ; 4.'. | 422 Sourn Cnuncu Srazer, Csuntorrh,h d.Idh 'IFi ; 4.'. | ||
wiw woaQata.sa. | wiw woaQata.sa. | ||
August 27, 1980 10 SEP 2 All 3 L. - | |||
3 | >o. | ||
* O Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 | $ttans Ppo0uctsON 3 | ||
Atlanta, Georgia 30303 | * O Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 | ||
==Subject:== | ==Subject:== | ||
| Line 32: | Line 31: | ||
==Reference:== | ==Reference:== | ||
R | R ALC ~ | ||
370/80-1M | 370/80-1M | ||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
Duke Power Company does not consider any information contained in IE Inspec-tion Report No. 50-370/80-11 to be proprietary. | Duke Power Company does not consider any information contained in IE Inspec-tion Report No. 50-370/80-11 to be proprietary. | ||
Very truly yours, William O. Parker, Jr. | Very truly yours, William O. Parker, Jr. | ||
LJB:ses | h LJB:ses 9 | ||
~ | |||
gpytemLCOM+ | |||
e | e | ||
/ | |||
'o UNITED STATES NUCLEAR REGULATORY COMMISSION o | |||
a R | |||
* GIO N il 101 man:ETT.4 sT., N.W., SUITE 3100 | |||
* GIO N il | ..... j/ | ||
ATLANTA, GEORGIA 30303 In Reply Refer To: | |||
RII:ALC 50-370/80-11 Duke Power Company ATTN: | |||
In Reply Refer To: | W. O. Parker, Jr. | ||
RII:ALC 50-370/80-11 | |||
Duke Power Company ATTN: | |||
Vice President, Steam Production | Vice President, Steam Production | ||
-P. O. Box 2178 Charlotte, NC 28242 Gentlemen: | |||
This refers to the inspection conducted by A. L. Cunningham of this office on July 7 through 9,1980 of activities authorized by NRC Construction Permit No. | This refers to the inspection conducted by A. L. Cunningham of this office on July 7 through 9,1980 of activities authorized by NRC Construction Permit No. | ||
CPPR-84 for the William B. McGuire Nuclear Station facility, and to the discus-sion of our findings held with J. Rogers at the 'nclusion of the inspection. | CPPR-84 for the William B. McGuire Nuclear Station facility, and to the discus-sion of our findings held with J. Rogers at the 'nclusion of the inspection. | ||
Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. | Areas examined during the inspection and our findings are discussed in the enclosed inspection report. | ||
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. | |||
Within the scope of this inspection, no items of noncompliance were disclosed. | Within the scope of this inspection, no items of noncompliance were disclosed. | ||
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary infor-mation identf fied in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room. | In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary infor-mation identf fied in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room. | ||
Should you have any questions concertiing this letter, we will be glad to di:: cuss them with you. | Should you have any questions concertiing this letter, we will be glad to di:: cuss them with you. | ||
Sincerely, | Sincerely, | ||
' -) | |||
. P ilip S ohr, Chief Fuel Facility and Materials | |||
~ | |||
Safety Branch | Safety Branch | ||
==Enclosure:== | ==Enclosure:== | ||
See Page 2 00} h gut L 3 | |||
Duke. Power Company | |||
Duke. Power Company | |||
==Enclosure:== | ==Enclosure:== | ||
Inspection Report No. 50-370/80-11 cc w/ enc 1: | |||
Inspection Report No. 50-370/80-11 cc w/ enc 1: | |||
M. D. McIntosh, Plant Manager J. C. Rogers, Project Manager 4}} | M. D. McIntosh, Plant Manager J. C. Rogers, Project Manager 4}} | ||
Latest revision as of 10:56, 24 December 2024
| ML19344F012 | |
| Person / Time | |
|---|---|
| Site: | Mcguire |
| Issue date: | 08/27/1980 |
| From: | Parker W DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19344F013 | List: |
| References | |
| NUDOCS 8009120262 | |
| Download: ML19344F012 (1) | |
Text
--
9 77 G.-
DUICE Powen COMPANY rowen ucitomo USNRC REr...:
422 Sourn Cnuncu Srazer, Csuntorrh,h d.Idh 'IFi ; 4.'.
wiw woaQata.sa.
August 27, 1980 10 SEP 2 All 3 L. -
>o.
$ttans Ppo0uctsON 3
- O Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Subject:
McGuire Nuclear Station Docket No. 50-370
Reference:
R ALC ~
370/80-1M
Dear Mr. O'Reilly:
Duke Power Company does not consider any information contained in IE Inspec-tion Report No. 50-370/80-11 to be proprietary.
Very truly yours, William O. Parker, Jr.
h LJB:ses 9
~
gpytemLCOM+
e
/
'o UNITED STATES NUCLEAR REGULATORY COMMISSION o
a R
- GIO N il 101 man:ETT.4 sT., N.W., SUITE 3100
..... j/
ATLANTA, GEORGIA 30303 In Reply Refer To:
RII:ALC 50-370/80-11 Duke Power Company ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
-P. O. Box 2178 Charlotte, NC 28242 Gentlemen:
This refers to the inspection conducted by A. L. Cunningham of this office on July 7 through 9,1980 of activities authorized by NRC Construction Permit No.
CPPR-84 for the William B. McGuire Nuclear Station facility, and to the discus-sion of our findings held with J. Rogers at the 'nclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the enclosed inspection report.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary infor-mation identf fied in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concertiing this letter, we will be glad to di:: cuss them with you.
Sincerely,
' -)
. P ilip S ohr, Chief Fuel Facility and Materials
~
Safety Branch
Enclosure:
See Page 2 00} h gut L 3
Duke. Power Company
Enclosure:
Inspection Report No. 50-370/80-11 cc w/ enc 1:
M. D. McIntosh, Plant Manager J. C. Rogers, Project Manager 4